                    ANNUAL REPORTS, WAR DEPARTMENT
                             FISCAL YEAR ENDED JUNE 30, 1934




                                REPORT OF THE

         CHIEF OF ENGINEERS
                                         U. S. ARMY


                                            1934

                                        IN TWO PARTS

                                           PART 1




                                           UNITED STATES

                                  GOVERNMENT PRINTING OFFICE
                                         WASHINGTON : 1934




For sale by the Superintendent of Documents,Washington, D. C. - - - - - - - - - - - - Price $2.00 (cloth)
     ANNUAL REPORT
          OF THE



CHIEF OF ENGINEERS
   UNITED STATES ARMY



          1934


                        1
                            REPORT
                                 OF


      THE CHIEF OF ENGINEERS
                    UNITED STATES ARMY


                                        WAR DEPARTMENT,
                          OFFICE OF THE CHIEF OF ENGINEERS,
                                 Washington, October 18, 1934.
Subject: Annual Report.
To: The Secretary of War.
  I present for your information the following report upon river
and harbor improvement work including flood-control operations
under the charge of the Corps of Engineers for the fiscal year
ending June 30, 1934.
                        RIVERS AND    HARBORS

   The improvement of rivers and harbors of the continental United
States, Puerto Rico, Alaska, and the Hawaiian Islands, for the fiscal
year 1934, was prosecuted in accordance with the projects author-
ized by Congress or by the Federal Emergency Administration of
Public Works. The number of projects in force at the close of the
fiscal year was 969, exclusive of projects for flood control on the
Mississippi River and its tributaries, the Sacramento River, Calif.,
the Missouri River at Niobrara, Nebr., and Yankton, S. Dak., Lowell
Creek and Salmon River, Alaska, all authorized by Congress, and
flood control on the Rio Grande, Tex., flood control in the Mus-
kingum conservancy district, flood control with labor from the
Civilian Conservation Corps on the Winooski River in Vermont, and
flood control combined with navigation storage for the Mononga-
hela River by the construction of a dam and reservoir on the Tygart
River, W. Va., authorized as Public Works projects.            Active
operations were in progress on 344 projects during the fiscal year.
The amount expended on the maintenance and improvement of
river and harbor works for the year was $98,696,975.83, on flood con-
trol, $48,143,461.55, on the operation and care of canals, removal of
wrecks, and other purposes covered by permanent definite and in-
definite appropriations $6,176,451.96, and for other miscellaneous
related work, $132,909.05, a total of $153,149,798.39.
    The work provided for under the $30,000,000 made available for
river and harbor projects from the Emergency Relief and Construc-
tion Act of July 21, 1932, has been practically completed to the
                                                              3
4      REPORT    OF CHIEF OF ENGINEERS,     U.   S. ARMY,   1934


material improvement of 51 projects. During the fiscal year the Ad-
ministration of Public Works has made available funds totaling
$249,110,752.84 for application to river and harbor and flood-control
projects, and with funds provided by the regular and indefinite
appropriations, amounting to $59,719,208.96, have made a total sum
available for the improvement of rivers and harbors of $308,829,-
961.80. Direct employment on June 30 resulting from the use of
these funds averaged 70,000 men per week and represented a ma-
terial contribution to the relief of unemployment. Additional allot-
ments provided by the Administration of Public Works since the end
of the fiscal year to include October 15, 1934, have made available
from that source a total of $343,274,752.84 for application to river
and harbor projects.
   Excellent progress was achieved on the improvement of the inland
waterways system, particularly in the extension of the project for the
upper Mississippi River and for the Missouri River; on the connect-
ing channels and harbors of the Great Lakes; on the improvement of
seacoast harbors; and on the intracoastal waterways. The intra-
coastal waterway system on the Atlantic coast now has available a
total of 1,419 miles, leaving only 16 miles for completion.
   The total number of locks operated during the year under the per-
manent indefinite appropriation for the operation and care of such
works was 304, and the number of dams was 228.
   In the execution of river and harbor works during the year the
approximate totals were as follows: Dredging, 399,560,018 cubic
yards; rock removal, 1,305,703 cubic yards; concrete placed, 739,769
cubic yards; dikes and bulkheads, 647,122 lineal feet; revetments,
372,159 lineal feet; stone placed in jetties and breakwaters, 2,296,275
tons.
   The policy of undertaking work by contract when reasonable bids
were received was continued during the fiscal year; 62.6 percent of
work was done by contract and 37.4 percent with Government plant
and hired labor.
   The water-borne commerce for the calendar year 1933 totaled
394,104,000 tons, having a reported value of $12,597,000,000.

                FLOOD CONTROL OF THE MISSISSIPPI RIVER

  Highly satisfactory progress has been made in the prosecution of
the flood-control work on the Mississippi River. A total of 126,-
368,330 cubic yards of earth was placed in the levees during the fiscal
year. Between Cairo and Memphis dike and revetment works, to
stabilize the navigation channel, have been prosecuted and are being
continued.
  Flood-control works on the Mississippi between Rock Island, Ill.,
and Cape Girardeau, Mo., and on outlets and tributaries as affected
by backwaters of the Mississippi have been prosecuted when local
contributions for such work, as required by law, have been provided.
The Federal allotments on this work during the fiscal year have
amounted to $132,640.11.
  With the emergency fund provided for the repair and maintenance
of flood-control works on any tributaries of the Mississippi threat-
ened or destroyed by flood, the Department was able to assist locali-
                                                   RIVERS             AND             HIARBORS                                                      5


ties in the repair of flood-control works. In addition, under the pro-
visions of the amendment of June 19, 1930, to the Flood Control Act
of May 15, 1928, reimbursements have been made to needy levee dis-
tricts which spent money in the repair of their flood-control works
after the 1927 flood and before the passage of the act of May 15, 1928.
The sum of $407,001.88 has been allotted for these purposes at various
localities in the Mississippi Valley in the 12 months ending June
30, 1934.
   During the year satisfactory progress was made on the flood-
control surveys of tributaries of the Mississippi River system, about
99 percent of the work being completed.
   Projects under the Pulblic Works program.-Under the policy in
force throughout the fiscal year, operations under the regular appro-
priations for the activities of the Department were limited to the
completion of contracts previously entered into and those necessary
for maintenance and similar current operations, new undertakings
being provided for under the Public Works program. The follow-
ing works had been included in the Public Works program on
October 15, 1934:

                                                                                                                         Allotted

                                       Rivers and harbors                                                    National In-          Emergency
                                                                                                             dustrial Re-          Appropria-
                                                                                                              covery Act            tion Act


Boston Harbor, Mass _----------________                 .        _                                $800, 000. 00                $260, 000
Cape Cod Canal, Mass_____     ... ________...____..._________....                                4, 600, 000. 00             1, 118, 000
New Haven Harbor, Conn _______ -               -__________________---_____                          292, 000. 00                 100, 000
Bay Ridge and Red Hook Channels, N. Y ______-              __--64,                                       559. 68
East River, N. Y-_-- ....-------------------------.--           _                    -           1, 748, 389.08
Buttermilk Channel, N. Y                   _________-                                               122, 051._24______________
Hudson River Channel, N. Y _________-- __--__-______-______-__                                      418, 373. 45                 165, 000
East Rockaway (Debs Inlet), N. Y                              __..----------------------------------170, 000. 00
Hudson River, N. Y                           ___________      _______                                  236, 000           ........
Cut-Off Channel, Raritan River to Arthur Kill, N. J_               --                               600, 000. 00                 244, 000
New York and New Jersey Channels                _______________________________                     390, 000. 00                 427, 000
Great Kills, Staten Island, N. Y          __                                                         62, 000. 00                            -----
Mayaguez Harbor, P. R            _________________________________                                  154, 000. 00
Delaware River, Philadelphia to Trenton                                                          1, 055, 000. 00                 750, 000
Delaware River, Philadelphia to the sea_-----------------------                                     300, 000. 00
Delaware River at Marcus Hook__---___                                                               550, C00.00
Ocean City Harbor and Sinepuxent Bay, Md_______-_________________                                   281, 000. 00                   -
IKnapps Narrows, Md....               ---------------------------------------                        68, 700. 00...........
T angier C hannel, Va .           ..    ---------------
                                                      _          -42,                                         00..........
                                                                                                           000.
-Pamlico Sound to Beaufort (N. C.) Channel_                                                          41, 400. 00
Upper Thoroughfare, Deals Island, Md----------------------------_                                    42,      000.00_____________
Jam es River, Va__..      .... .. . .. . .. . .. . . .. . .. . .. . .                     .         595, 000. 00
Inland Waterway, Norfolk, Va., to Beaufort Inlet, N. C. (Fairfield Bridge)                                                                    90, 000
Morehead City Harbor, N. C                       ------------------------------------                        1, 555, 000. 00
Cape Fear River, N. C.-Winyah Bay, S. C., waterway:
     Dredging            --------------------------------------------------                                     900, 000. 00               650, 000
     Bridges           ..                                                    ....
                                                                          _________                                   000. 00
                                                                                                                3----------------------------------------------------50,
                                      - -
Cape Fear River above Wilmington- ........                              __--------------                 -   1,120, 000. 00-        - - - -
Winyah Bay-Charleston waterway_                                                                              129,00
                                                                                                             1, 296, 000. 00       ......
Oharleston Harbor, S. C--------------                                                                           176,400. 00
Savannah River below Augusta, Ga .........                                            .   .- .   .   .       1,775, 000. 00
Brunswick Harbor, Ga---.           --...---..----.                     --                                       180, 000. 00
St. Johns River, Fla., Jacksonville to the ocean------              __ -      --                                290, 013. 37 .    -..
Caloosahatchee River and Lake Okeechobee, Fla_------                       --                                4, 200, 000. 00    3, 700, 000
Jacksonville to Miami waterway, Florida .....                . .-----------   ----                           2,000, 000. 00             -
Fort Pierce Inlet, Fla-----------------_                                                                        250, 000. 00
                       ,_
Tampa Harbor, Fla------------                                        -----                                      739, 360. 59       500, 000
M iam i Harbor, Fla-..... ..... ..... .... ..... ..... .... ..... ..... .. .                                 2, 202,126. 04
River Styx, Fla....                                                                                              15, 000. 00              --
Lake Worth Inlet, Fla-----------------_                                                                          30, 000. 00              --
                         _
Alabama River, Ala-----------                               ------                                              140, 000. 00
St. Andrews Bay, Fla---.._         ---------                                                                    505655. 00 ..........
                                                                                                                580,
Pensacola Harbor, Fla- --                 ... - ...
                                  --..........      -......    ...-                                             119, 971. 55
6             REPORT OF CHIEF OF ENGINEERS,                                          U.    S. ARMY,             1934


                                                                                                               Allotted

                                    Rivers and harbors                                             National In-        Emergency
                                                                                                   dustrial Re-        Appropria-
                                                                                                   covery Act           tion Act

Mobile Harbor, Ala...............................................-----------------------                               $14,000. 00 ___________
Black Warrior, Warrior, and Tombigbee Rivers, Ala....                                      --........---.....           80, 000. 00 -- ____--
Gulfport Harbor and Ship Island Pass, Miss__..__--                                      .....------------------ 50,         000.00
Louisiana-Texas intracoastal waterway ._.                               ..............------------------               844, 704. 22
Lakes Charles Deep Water Channel, La-_                             ....--------------------                             80, 000. 00
Mermentau River, La..................--------------------------------------------..                                     30, 000. 00------------
Petit Anse, Carlin, and Tigre Bayous, La_--- ----------................ 38, 500 .
Sabine-Neches waterway, Texas__..               --.. ...............-------------............                       1,463,000. 00 ...
Galveston Harbor and Channel, Tex-_ .                        .                                                          15, 000. 00
                                                                                                                        1--..-..__------
Texas City Channel, Tex------------------------.                          ___-----   --                                136, 295.78
Houston Ship Channel, Tex..........__.                          .... .-------............ 1, 500, 000. 00                                    $1, 043, 000,
Freeport Harbor, Tex .....                            ..         ..---------------------------------                   126, 500. 00 ..............
Port Aransas, Tex        ...           .........----------------------------------------------                         272, 000. 00
Brazos Island Harbor, Tex-_ .. -                   ....               .__.--------_-.._                   .... 2, 800, 000. 00
Wolf River, Tenn         .....                   ......-----------------------------------------------                 603, 000. 00
Mississippi River:
     Ohio-Missouri Rivers- ...-                    ___         ..            ..-------
                                                                                    ....                            3, 000, 000. 00
                                                                                                              -.-....                         1, 000, 000
     Missouri River to Minneapolis__-- -----..           ._.__----.----                                            33, 500, 000. 00          17, 000, 000
Missouri River; Kansas City to the mouth:
     Channel regulations_... ___    -...   -------.---
                                            __...........--                                                         3, 600, 000. 00           1, 736, 000
     Dredges-------------------..............-------------------......--------.........                             1,360, 000. 00 .------------
Missouri River, Kansas City to Sioux City ... .........--------------------                                        14, 153, 108. 00          15, 000, 000
Missouri River; Fort Peck----.....             .               .-.------.-----------            .-                 25, 000, 000. 00         25, 000, 000
Illinois River, Ill--- -    _-_-_ ________-------.--..---------------910, 000. 00                                                                203, 000
Cumberland River, Tenn. and Ky.........._______________________
Ohio River:
                                                                                           __...........        .      868, 000. 00      -
     Lock and dam construction ---------------------        ..............                                          3,145, 000. 00
     Open channel work....................---.......................... 1, 030, 000. 00                                                          500, 000
Green and Barren Rivers, Ky              ...-.............................-------..                                     85, 000. 00
Allegheny River, Pa__.------.-                       ...          ._.---------------------.---                      1, 033, 000. 00              240, 000,
Kanawha River, W. Va .._- _____.-----.--.-------------                                                              6, 169, 200. 00           2, 200, 000
Tygart Reservoir, W. Va .........---              --....--............................----------------------        3, 000, 000. 00           7, 000, 000
Agate Bay Harbor, Minn .--------------------                                     -                                      51, 700. 00
Duluth-Superior Harbor, Minn. and Wis--------------------------............
Ashland Harbor, Wis ----- -------------------------
Marquette Harbor, Mich.                    -----------------------------------------
                                                                                                                      -
                                                                                                                    1,096, 000.00
                                                                                                                       208, 000. 00
                                                                                                                        79, 200. 00 -----------
Port Washington Harbor, Wis ........------...--------.                     --------------------            ... 590, 000. 00
Green Bay Harbor, Wis- ---            ------------------
                                       .                                      ____-625,           ..----                    000. 00
Milwaukee Harbor, Wis .-------------------------------------------                                                      25, 000. 00
Calumet Harbor and River, Ill. and Ind ........----------------------                                               3,058, 700. 00 ----
Indiana Harbor, Ind--               ._____.----- -------------------------                                             897, 000. 00              782, 000
Mackinac-Round Island Channel, Mich ---                                  .---------------------- 434, 000. 00 ...........
St. Marys River, Mich                  -------------------------------------------                                     175, 000. 00 ----
St. Clair River, Mich .. _....__ ...... ...-........---------
Channels in Lake St. Clair, Mich_-......                    _____-.
Detroit River, Mich-.. __...--------............___.-.-.---..
                                                                               ----------------- 1, 122, 000. 00
                                                                   ---------------------
                                                                     ..---                                          1, 049, 300. 00
                                                                                                                    1,402, 000. 00
                                                                                                                                         -       800, 000
                                                                                                                                                 960, 000
Toledo Harbor, Ohio- .---...--------------------        __                 ---- --                        -_        3, 690, 000. 00
Lorain Harbor, Ohio---------                  ------------------------------------                                     165, 000. 00 __
Lorain Harbor (Black River) Ohio_---___--..                               --------------------                          76, 300. 00-__________
Sandusky Harbor, Ohio __........................-___
Cleveland Harbor, Ohio                   ------------------------------------------ 469, 000. 00
                                                                                                     _      _--       --
                                                                                                                       407, 500. 00
                                                                                                                                                 150, 000
Ashtabula Harbor, Ohio...                ------------------------------------------ 431, 000. 00
Conneaut Harbor, Ohio                    ------------------------------------------                                    927, 000. 00
Fairport Harbor, Ohio ....                                 ___.-------------------------------------------355,               000. 00 ------------
Huron Harbor, Ohio          ---------------------------------------------                                              509, 500. 00 --------
Buffalo Harbor, N. Y          --------------------------------------------                                             714, 000. 00 ----------
Niagara River N. Y
Ogdensburg Harbor, N. Y...
                            ---------------------------------------------
                                                      ... ..                 ...
                                                                                                                     ----------
                                                                                                                       100, 000. 00
                                                                                                                       187, 000. 00 -------
                                                                                                   ....----------------------------------------
                          ....-------------------.... _.._
Honolulu Harbor, T. H------                                                                                            802, 800. 00
Port Allen Harbor, T. H           .                 -----------------------                                            680, 000. 00
Kaunakakai Harbor, T. H                      ---------------------------------------- 103,                                   200. 00 --------------
San Diego Harbor, Calif                 -------------------------------------------                                     86, 352. 01 _
Los Angeles and Long Beach Harbors, Calif- .. _..----------_----                                                    1, 650, 000. 00.-....
Newport Bay,Calif. ---------------------------------------------                                                       918, 000. 00 ---------
San Francisco Harbor, Calif--..................                       --------------        .         ....---..        193, 000. 00 -.
                           ..---------------....
Richmond Harbor, Calif-------------                                                                                    105, 000. 00 -_.
Monterey Harbor, Calif-------------............----------                                                              207, 800. 00
San Joaquin River, Calif----.....       ----
                                          _------------------
Columbia and Lower Willamette Rivers ......                                     _---------------------
                                                                                                                       ----
                                                                                                                    1, 158, 347. 99
                                                                                                                       446, 500. 00 -
Columbia River at Bonneville, Oreg--------- .--------------                                                   - 20, 240, 700. 00            12, 200, 000,
Columbia River at Bakers Bay, Wash_-----------------------------                                                       80, 000.00 ...........
Willapa River and Harbor, Wash..                                                                                     ----------
                                                                                                                             533. 00
                                                                                                                        78,533-----------------78,
Grays Harbor and Chehalis River, Wash----__ -------                ___                                                 57, 000. 00...........
                                                                                                                _---------
Tacoma Harbor, Wash ...-...                        -.            -             -
                                                                              ..----            -             -         51, 609.12
Lake Washington Ship Canal, Wash-------..----                                         ..---------------------          196, 390. 88
Olympia Harbor, Wash ........-                                 --                                                     105, 467. 00 -------------
Wrangell Narrows, Alaska--.-----------------                                 ..-.-..                          .        139, 000. 00 ........
Office, Chief of Engineers -..----                            -......                ------..             ------. 31, 000. 00
        Total---        -
             ................ ....                        .         .     ..               181, 471, 208. 00
                                                                                   ...........                                93, 818, 000
                                        RIVERS AND HARBORS                                                              7
                                             FLOOD CONTROL


                                                                                             Allotted

                                 Rivers and harbors                              National In-        Emergency
                                                                                 dustriol Re-          Appropria-
                                                                                  covery Act            tion Act

Mississippi River and tributaries--........----...-------------------------.. $44, 000, 000. 00 ..---------
:Sacramento River, Calif-_ ----------------            ----------------------- 1, 500, 000. 00
Winooski River, Vt-------------            -------------------------------      300, 000. 00        --.---------


Muskingum Valley, Ohio--------------------              ------------------- 22, 090. 000.00         __.-----__--
Rio Grande----               --   ----------------------------------------       42, 000. 00
Salmon River, Alaska----------------                 ----------------------------------------                      $46,000
      Total------------------               ----- ------------------------       67, 932, 000. 00                  46, 000


                                             MISCELLANEOUS


                                                     --
Repair break in water main, Intracoastal Canal, La_____-      __--
                                                             ----                     $7, 544. 84--...----
Puerto Rico (roads and drainage) ----------------------------------               1, 500, 000. 00 ..-----------
                           __$20,000 ---------------
Dalecarlia Reservoir, D. C--_-
     Total             --------------------------------------------------         1,507, 544 84                    $20,000



   Surveys.-Reports on 64 preliminary examinations and surveys
have been transmitted to Congress during the fiscal year. In addi-
tion, 69 reviews of previous reports requested by resolutions of the
Committee on Commerce of the Senate or the Committee on Rivers
.and Harbors of the House of Representatives have been forwarded
to the committees. The comprehensive surveys of the principal river
systems of the country, nearly 200 in number, with a view to the
formulation of general plans for their improvement, have been con-
tinued, and the reports thereon are well advanced to completion.
During the year reports on 17 of these river systems have been
completed and transmitted to Congress, making a total of 173 such
investigations that have been completed. An officer and one en-
listed man were retained in Nicaragua to continue the collection
!of hydrological and meteorological data in connection with the sur-
vey for an interoceanic canal across Nicaragua, report upon which
was transmitted to Congress December 10, 1931.
   Miscellaneous civil works.-Miscellaneous civil works under the
Corps of Engineers are varied in character and include the adminis-
tration of the Federal laws enacted for the protection and preserva-
tion of navigable waters of the United States governing the estab-
lishment of regulations for the use, administration, and navigation
of navigable waters, the approval of plans of bridges, the alteration
of obstructive bridges, the establishment of anchorage grounds and
harbor lines, the removal of sunken vessels obstructing or endanger-
ing navigation, the granting of permits for structures or operations
in navigable waters, the supervision of the harbor of New York to
prevent obstruction or injurious deposits in the tidal waters thereof,
including the waters of Long Island Sound; the construction of
Anacosia Park and the reclamation and development of Anacostia
River and Flats, D. C.; the maintenance and repair of the Washing-
ton Aqueduct, and increasing the water supply of the city of Wash-
8       REPORT    OF CHIEF     OF ENGINEERS, U.       S. ARMY,     1934


ington; surveys and charting of the northern and northwestern lakes,
including the Lake of the Woods; studies for the preservation of
Niagara Falls and the supervision of power companies diverting
water therefrom; the carrying into effect of the provisions of the
convention between the United States and Great Britain to regulate
the level of the Lake of the Woods; the investigation of claims for
damages caused to inhabitants of the United States by the artificial
raising of the level of that lake, the report on which was submitted
to Congress February 16, 1931; investigations under the Rainy Lake
reference, agreed to between the United States and Great Britain,
for determining questions concerning the possible regulation of the
level of the lake and adjacent waters; reports of international boards
on power-plant operations affecting the St. Croix River, Maine and
New Brunswick, Lake Memphremagog, and the St. Lawrence River.
   Appropriatios.-The funds with which the works for the im-
provements of rivers and harbors were prosecuted during the past
fiscal year were derived from the appropriations made by War
Department appropriation acts, and from such appropriations as
have been provided by other general acts and by special acts of
Congress and from the National Industrial Recovery Act.
   The following works are provided for by permanent appropria-
tions: Removing sunken vessels; operating snag and dredge boats
on upper Mississippi River and tributaries; removing obstructions
in Mississippi River; gaging waters of the Mississippi River and its
tributaries; examinations and surveys at South Pass, Mississippi
River; maintenance of South Pass Channel, Mississippi River; op-
erating snag boats on Ohio River; operating and care of canals,
etc.; and support and maintenance of the Permanent International
Association of the Congresses of Navigation.
Appropriations for rivers and harbors and flood
control from July 1, 1933, to June 30, 1934:
   War Department Appropriation Act of Apr.
     26, 1934:
        Maintenance and improvement of ex-
          ing river and harbor works________ $23, 966, 645. 00
        Flood control, Mississippi River and
              tributaries                       29, 000, 000. 00
        Emergency fund for flood control on
           tributaries of Mississippi River__.      341, 291. 00
                                                                   $53, 30-7, 936.00
    Permanent annual appropriations for fiscal year 1934 ____           273, 360. 00
    Indefinite appropriations (warrants issued
      during fiscal year 1934) :
        Operating and care of canals, etc_____ $5, 896. 701. 28
        Removing sunken vessels, etc -.....          48. 437. 97
                                                                     5, 945, 139. 25
    Special fund (credits to account from licenses under Fed-
      eral Water Power Act, June 10, 1920, (sec. 17)) :
        Maintenance and operation of dams and other im-
           provements to navigable waters____                          190, 940. 61
    Deficiency Appropriation Act, fiscal year 1934, claims for
      damages by collision, river and harbor work_____ _____              1, 833. 10

                                                                    59, 719, 208. 96
                                             RIVERS AND HARBORS

Allotments made by the Federal Emergency Ad-
  ministration of Public Works for rivers and
  harbors and flood-control works from July
  1, 1933, to June 30, 1934:
     National Industrial Recovery Act, June
       16, 1933:
          Rivers and harbors----------------- $179, 923, 752. 84
          Flood control------------------------69,187, 000. 00
                                                                                                                $249,110,752. 84

          Total----- --------------------------------------- 308, 829, 961. 80
   The following amounts have been advanced by local interests for
river and harbor improvements under the provisions of section 11,
River and Harbor Act, March 3, 1925, and are returnable to them
when the necessary Government funds are available:
                                                                           Balance         Amounts         Amounts          Balance
                                                                          due from         received        returned         Ue from
                                                                                                                           due
                                                                          United                                            United
                     Project                             District         States            during          during           States
                                                                          July 1,                                          June 30,
                                                                           1933              year              year           1934


Inland waterway from Norfolk, Va., to                 Norfolk- ....        $200, 000 -----------.            $100, 000           $100, 000
  Beaufort Inlet, N. C.
Glencove Creek, N. Y_____________                     New     York,       ---                $24, 000         -----                24, 000
                                                       first.
       Total _____--           -         -            ____                  200, 000          24, 000          100, 000           124, 000

    Statement of amounts of furlough and compensation deductions
carried to the surplus fund by warrants issued during the fiscal year
1934, and amounts of vacancy savings transferred to reserve for
impounded balances, during the fiscal year 1934, under the Economy
Acts of June 30, 1932, March 20, 1933, and March 28, 1934.
                                                                                               Furlough and            Net amount of
                                                                                              compensation            vacancy savings
                                                                                                deductions              transferred to
                                       Appropriation                                           covered into            reserve for im-
                                                                                               surplus fund             pounded bal-
                                                                                              on books of the          ances on books
                                                                                                 Treasury              of the Treasury


Maintenance and improvement of existing river and harbor works-------                  $1, 255, 004. 72                    $292, 878. 64
Maintenance and improvement of existing river and harbor works,
  Emergency Construction Act July 21, 1932----------___          ---------------- __        76, 435.25
Dredging channel, Fort Pierce Harbor, Fla---------------           --          ------------ 205. 84
Operating and care of canals, etc..._______-___ ___----...------        -.-...--           150, 194. 20                          3, 085. 11
Removing sunken vessels, etc __-----_________.    __----- --... _                            -__162. 88
Flood control, Mississippi River and tributaries ..----------------------                  471, 596. 33                        82, 791. 86
Flood control, Emergency Construction Act July 21, 1932 ..........                          14, 672. 49                   --
Emergency fund for flood control on tributaries of Mississippi River -----                  10, 847. 24
Flood control, Lowell Creek, Alaska _________________________________.
                                             ..                                                   4. 40
Flood control, Lowell Creek, Alaska, 1933-34-.........                             ------
                                                                                -------..                   94. 75
Flood control, Sacramento River, Calif __________._________.__.__...
                                                                 _                                    21, 669. 16               18, 940. 00
Removing obstructions in Mississippi, Atchafalaya, and Old Rivers .-.                                     984. 10
Operating snag and dredge boats on upper Mississippi, Illinois, and
  Minnesota Rivers------------------------------------------          ---                       -           83. 75
Operating snag boats on the Ohio River__________.. ________________-
                                                             - -         -                                    .70
Gaging waters of Mississippi River and tributaries- ........                     _                        251. 05
Maintenance of channel, South Pass, Mississippi River ..      .   .                                         23. 75
Examinations and surveys at South Pass, Mississippi River                                                   49. 38
                                                                                                            49......38.
Maintenance and operation of Dam No. 2, Muscle Shoals, Ala., 1933                                       5, 432. 19                    --
Maintenance and operation of Dam No. 2, Muscle Shoals, Ala., 1933-34_                                   3, 033. 19
Dam No. 2, Muscle Shoals, Ala . ----------------------- -----------                                        642. 47
Protective works and measures, Lake of the Woods and Rainy River,
  M inn., 1928-34 -- -- - -- -- - -- -- - -- -- - -- -- - -- --                                           440. 93                     2. 00
Interoceanic canals ...     .... ------------------------             -                                   235. 78
    Total .- . _ _..         ..... ..... ....-      -...    .                                   2, 012, 064. 55                397, 697. 61
Funds contributed for flood control, Mississippi River and tributaries-.._                              212. 27
       Total_----.                 -          -----             -------                _     -- 2, 012, 276. 82                397, 697. 61
10       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                           1934

  Expenditures.-The total amount actually expended under the
direction of the Chief of Engineers in connection with the improve-
ment of rivers and harbors and flood-control work during the fiscal
year ended June 30, 1934, is as follows:
Improvement of rivers and harbors (general) :
    New work--------------------------------------                          $14, 141, 738. 00
    Maintenance         -------------------------------------                18, 953, 830.15
    Surveys under H. Doc. 308 (69th Cong., 1st sess.), new
      work--------------------------------------------                             21, 709. 08
    Emergency Relief and Construction Act of July 21, 1932:
        New work-               --------------------- -------------          14, 433, 967. 11
         Maintenance                                                              13, 765. 84
                                                                                 9------------------------------
    National Industrial Recovery Act, June 16, 1933:
        Rivers and harbors:
             New work--------------- ------------------                      49, 957, 294. 78
             Maintenance-_                                                       27------------------
                                                                                24,   670. 87
                                                                             98, 696, 975. 83

Improvement     of  Mississippi
  River under Mississippi River
  Commission :
    Flood control (general) :
        New work---------- $15, 765, 373. 80
        Maintenance------ ----  682, 723. 37
                                                       $16, 448, 097. 17
     Emergency Relief and Con-
       struction Act of July 21,
       1932 :
         New work______          -   6, 283, 618. 10
          Maintenance----------           9, 488. 25
                                                         6, 293, 106. 35
     Emergency fund for flood
      control on tributaries of
      Mississippi River :
        New work ______      __        351, 138. 38
         Maintenance----------          11, 300. 24
                                                            362, 438. 62
     National Industrial Recov-
       ery Act, June 16, 1933:
         New work ----------- 17, 395, 839. 00
         Maintenance---------- 6, 546, 175. 01
                                                        23, 942, 014. 01
                                                                             47, 045, 656. 15
Improvement of      Sacramento
  River under California Debris
  Commission:
    Flood control:
        New work___ ___ .                86, 309. 94
        Maintenance                      54, 527. 32
                                                            140, 837. 26
     National Industrial Recov-
       ery Act, June 16, 1933:
         New work__                    646, 337. 44
         Maintenance-                   91, 695. 51
                                                            738, 0321. 95
                                                                                  878, 870. 21
         Flood control:
             Rio Grande, near San Benito, Tex. (new work) -                        41, 833. 84
             Muskingum River Valley Reservoirs (new work)__                       107, 643. 96
     Surveys under sec. 10, Flood Control Act, May 15, 1928
       (new work)----------------------------------------                          59, 864. 17

Flood control, Lowell Creek, Alaska (maintenance) ---------                         9, 593. 22
                                            RIVERS AND HARBORS                                                           11
Summary:
   New work                         --------------------------------------                            $119,2921,667. 60
   Maintenance----                    -------------------------------                                  27, 547, 769. 78
          Aggregate -----------------------------------                                               146, 840, 437. 38

Removing sunken vessels, etc--- ---------------------------           36, 939. 9
Operating and care of canals, etc-------------------------5,         993, 648. 79
Operating snag and dredge boats: on Upper Mississippi River
  and tributaries - -------         -     --                __              15. 25
Operating snag boats on Ohio River --------------------------               49. 06
Removing obstructions in Mississippi, Atchafalaya, and Old
  Rivers------------------------------------------------              62, 835. 03
Examinations and surveys at South Pass, Mississippi River.___           4, 146.32
Maintenance of South Pass Channel, Mississippi River                  69, 301. 43     --------
Gaging waters of the Mississippi River and its tributaries -7,             690. 90
Permanent International Commission of Congresses of Navi-
  gation ------------------------------------------------               1, 795.25
       Total expenditures from Government funds (river and
      harbor, and flood-control work)                               016, 889.34
                                                               1--------------------53,

  Note 1.--Additional expenditures of $7,430.90 made by the
Mississippi River Commission are included in the amount stated
for gaging waters of the Mississippi River and its tributaries.
  Note 2.--The foregoing statement of expenditures from river
and harbor funds does not include the following expenditures
made by the Engineer Department:
    Protective works and measures, Lake of the Woods and
      Rainy River, Minn. (United States funds) ---------------                                                 46, 718. 05
    Protective works and measures, Lake of the Woods and
      Rainy River, Minn. (Canadian funds) --                    __------43,                                        994. 46
    Rainy Lake reference (State transfer to War, act May
      21, 1930) --------------                --------------------------                                             9. 04
    Chicago World's Fair Centennial Celebration (transfer to
      War) ----------------------------------                                                                      328. B
    Dam No. 2, Muscle Shoals, Ala. (construction) -----------                                                   2, 287. 03
    Maintenance and operation, Dam No. 2, Muscle Shoals,
      Ala -----------------------------------------------                                                      20, 614. 35
    Interoceanic canals ----------------------------                        ----                                1, 935. 96
    Funds advanced for improvement of rivers and harbors,
      special fund (sec. 11, River and Harbor Act, Mar. 3,
      1925) --------              -----------------------------                                                17, 021. 60

              Total-----------                   -------------------------------                              132, 909. 05
  Expenditures have also been made from funds contributed by
States, municipalities, and private parties for improvements as
follows:

                                  Project                                     New work         Maite-
                                                                                               nance             Total
                                                                                                                    a


Ocean City Inlet and Sinepuxent Bay, Md____----__------------              $97, 238. 00                          $97, 238. 00
Investigation of shore erosion, New Hampshire- ---- _-----------                102. 42                               102. 42
Investigation of beach erosion, Folly Beach, S. C_ ..----.------                130.36                                130.36
Monroe Harbor, Mich_-         .     .    .     ..--------------------------74, 533.42                             74, 533. 42"
Brazos Island Harbor, Tex .---------
                               __           _.      ...          ..------------------
                                                                           165,778. 39                           165,778.39
Freeport Harbor, Tex-.....-.-----------------------------                  109, 356. 93 ............             109,356.93'
Caloosahatchee and Lake Okeechobee drainage areas, Florida ..--                 593. 56       - --000.
                                                                                            $4,         00
                                                                                                     - ----
                                                                                                                      593. 56
Missouri River below Kansas City, Mo...-----------------                  ------------                             4, 000. 00:
Wolf River (Memphis Harbor), Tenn _ .              .     ..-------------------
                                                                            17, 500. 00                           17, 500. 00t)
Biloxi Harbor, Miss .____----
                       _        ------------------ ----------                5, 000. 00                            5, 000.00
East Rockaway (Debs) Inlet, N. Y_.....-__---------------------              40, 001.18                            40, 001. 18'
Glencove Creek, N. Y-------.. -------------------------------- 24, 000. 00                                        24, 000, 00
12            REPORT            OF CHIEF              OF ENGINEERS, U.                           S.   ARMY,        1934


                                                                                                           Mainte-
                                      Project                                           New work            nance            Total
                                                                                    i



Little Tallahatchie River, Miss...._______________                                          $248. 21         $372. 31            $620. 52
Nome Harbor, Alaska .. __.....-------------------                    -                                      2, 500. 00          2, 500. 00
Port Allen Harbor, T. H __-                                                                1, 795. 73                           1, 795. 73
       Total---                   -------              -----                            536, 278. 20        6, 872. 31        543, 150. 51

Under Mississippi River Commission:
   Improvement of Mississippi River, Yazoo, Miss., delta levee
       district_----------------                                       6, 991. 18                                               6,991.18
     Lower Yazoo levee district-       .----------------.              1, 200. 58                                               1, 200. 58
     Flood control, Mississippi River, its outlets and tributaries__ 155,. 169. 56                                            155, 169. 56

       Total-                                                                           163, 361.32                           163, 361.32

Under California D6bris Commission:
   Yuba River, Calif                          _ ---   _---                      _           .__            11, 535. 79         11, 535. 79
   Flood Control, Sacramento River, Calif___ ____...___                                   83, 542. 83      15, 000. 00         98, 542. 83

       Total __..------------.-----------------                                           83, 542. 83     26, 535. 79         110, 078. 62

       Grand total contributed funds ..------------------------...................---- 783, 182. 35       33, 408. 10        816, 590. 45
       Grand total all funds ____...............................                        . _ ..          . ____           153, 966, 388. 84
                                                                     Consolidated cost and financial summary as of June 30, 1934
                                                                                                                                                                                                              Amount                                      Amount
                                                                                                                                                                                                             (estimated)                                 (estimated)
                                                                                              Value of plant,
                                                                                                       Add                         Minus                                                                                                                required to
                                                    Cost of new             Cost of    stocks, and                                                      Total expen-         Balance           Total to be required to
                                                      work                                           accounts
                                                                          maintenance undistributed receivable                    accounts                ditures          unexpended         accounted for complete all                                complete all
                                                                                                                                  payable                                                                    authorized                                   projects
                                                                                          items                                                                                                                                                         authorized
                                                                                                                                                                                                              projects                                  by Congress
 --                                                     I-I                                     I                I                     I-                                   I                I---------I                             I------

Seacoast harbors and channels .....                       $473, 989, 350. 93 $184,209,952.40 $17, 012, 376. 37 $788, 104. 82 $3,306,786.73 $672,               692,997.        462, 238.21 $705,
                                                                                                                                                                         79 $32,                         155,236.0( $73,854,800       1$55,204,000
Lake harbors and channels ........                          165, 768, 862. 31 44, 765, 188. 01 3, 713, 069. 49 123, 120. 04 1, 166, 333.12 213, 203, 906. 73 22, 379, 150. 08 235, 583,                       056. 81   18, 145, 600     10, 224, 000
Mississippi River system _____                              454, 658, 206. 54 73, 056, 630. 42 15, 131, 626. 82 665, 548. 73 7,104, 313.51 536, 407, 699. 00 79, 482, 138. 23 615, 889, 837. 22 198, 013, 000 2154, 688, 000
Intracoastal canals and other water-
   ways ...- ... .. ... ... ..                   .          101, 751, 023. 66 31, 194, 797. 71 2, 171, 894. 51 117, 252. 56 1, 292, 772. 67 133, 942, 195. 77 29, 728, 040. 21 163, 670, 235. 98 20,090,000 11,690,000
Examinations, surveys and con-
   tingencies of rivers and harbors. ---------------- 23, 198, 142. 66                               39, 841. 43         21, 556. 52          60, 905. 84  23, 198, 634. 77 1, 280, 423. 33        24, 479, 058. 1(
Surveys, H. Doc. No. 308, 69th
   Cong., 1st sess., and sec. 10,
   Flood Control Act, May 15, 1928:                                                                                ............
      River and harbor funds -----                            5, 756, 988. 53                                                                               5, 756, 988. 53      18, 008. 54         5, 774, 997. 07     1, 547,400        1,547,400
      Flood control funds _____-___                           4, 219, 226. 47                                                                               4, 219,226.47       24,229.39            4, 243, 455. 86        756, 500            756, 500
Operating and care of canals ______                                           129, 756, 481. 65 3, 083,                142, 653.85
                                                                                                         994.31 ............                 345, 512. 32 132, 637, 617. 49                      132, 637, 617. 49                                       P2
Removing sunken vessels .-..-...                                                6,282, 138.  63                                                                          63
                                                                                                                                                            6, 282, 138. --------------     /        6,  282, 138. 62
Dam No. 2, Tennessee River, Ala.:
      Construction_____________..                  ___       46, 666, 643. 15      359, 592. 52    -52, 700. 03                                            46, 973, 535. 64      12, 048. 63       46, 985, 584. 27
      Operating and care, hydroelec-
        trical development........... ---------------- 1, 711, 941. 08                                -284.60                   284.60                      1, 711, 941. 08    222,  871. 30         1, 934, 812. 31
Permanent International Associa-
   tion of Congresses of Navigation-.                             65,098.43                                                                                     65, 098. 45                               65, 098. 41
Flood control:                                                                --------------
      Mississippi River and tributar-
        ies _-- - - - - - - - - - - -                       292, 512, 812. 31 70,366,636.53    1 16,270,382.63800, 313. 77 3, 020, 250.20 376, 929, 895. 04 29,610,991.                   36 406, 540, 886. 40 67, 090, 076 67, 090, 076                 O
      Emergency funds for flood con-
        trol on tributaries of Missis-
        sippi River_________________                          2, 462, 119. 86      515, 937. 97                             1,671.09 27, 757. 52            2, 951, 971.40     396, 331. 32          3, 348, 302. 72     1, 310, 709       1, 310, 709
      Sacramento River, Calif __-...                         13, 664, 508. 73      565, 272. 29     180, 730. 31         18, 804.91          209, 385. 39  14, 219, 930. 85 1, 801, 920. 70        16, 021, 851. 5       2, 191, 620       2,191,620
      Missouri River at Niobrara,
        N ebr__ __..            _......
                                    .....     .....                                                                                                                             85,000.   00              85, 000. C0
                                                                                                                                                                                                                                      - _. ....      --
      Missouri River at Yankton,
        S .D ak ...............           : ......                                                                              171...85....                                    85, 000. 00               85, 000. 0o
      Muskingum Valley Reservoirs,
        Ohio . .---.         . .                 - .
                                            ..---------          150,603.42                          87,575.  27                171.85       130, 706. 58      107,643.96 21,982,356.04            22, 090, 000. 0C
      Rio Grande, Tex ___________                                 41, 833. 84                                     -----------                     213. 75       41, 833.84           166. 16              42, 000. 0o
      Lowell Creek, Alaska .........                              88, 157. 87       21, 541.89                                          213.   75              109, 486. 01     11, 171. 81              120, 657. 82
Interoceanic canal survey .--------                              128, 978. 24                                                                                  128,978.  24     21,  021.76              150, 000. 00
                                                                      !                   I                     1             I                     1                  1                  1                     1.   -   -   -   -   -   -   -   -   - I.   -   -   -   -


                                                                                                                                                          171, 581, 719.67219, 603,107.07 72,391, 184, 826. 74 4382, 999, 705 S304. 702, 305
                                                                                                                                                                                                                                                      :1i




        Total __---_---_ ----------- 1, 561, 924,414. 29f566, 004, 253. 76 57. 638. 506. 512. 679, 482. 74116, 664, 937. 63j2,
           River and harbor .-------                                                                                                                                                                                  311, 650, 800 5233, 353,400
           Flood control__ _________                                                                                                                                                                                   71, 348, 905 71,348,905

      Footnotes on following page.                                                                                                                                                                                                                                          C3
                                                  Consolidated cost and financial summary as of June 30, 1934--Continued

                                                                                                                                                                              Balance             Total to be
                                                                                                                                                                            unexpended           accounted for


Unallotted balances (June 30, 1934):
   Maintenance and improvement of existing river and harbor works            ___    ________               ...........                            _ ________------------------$9, 163, 545. 58      $9, 163, 545. 58    C
   Flood control, Mississippi River and tributaries_______--- _______________-___                                                                                            40,897, 921. 52        40, 897, 921. 52
   Emergency funds for flood control on tributaries of Mississippi River_--_______---------------------_                                                                          327, 364. 63          327, 364. 63    H
   Flood control, Mississippi River and tributaries (National Recovery Administration)-___--------___                  -__---------------_____                                 1,852,125.05           1,852,125.05
   Special funds (credits from licenses under Federal Water Power Act, June 10, 1920)------              ------__                 - __-        --- ______-_
                                                                                                                                            - ___          ----                   375, 906. 71          375,906. 71     O
       Total-----------------------------------------------                                --      -         --           --------------------                                52, 616, 863.49       52,616,863.49
                                                                                                                                                                                                                        C
      Grand total--...---------------------------------------------------------------------------------------------                                                          272, 219, 970. 56   2, 443, 801, 690. 23
Additional funds allotted by the Public Works Administration to Oct. 15, 1934, for work under the Corps of Engineers----                                                                             93, 864, 000. 00
                                                                                                                                                                                                                        0
  1 Includes $3,384,000 for completion of project for Connecticut River above Hartford                              4 Includes Public Works Administration allotments to Oct. 15, 1934.
adopted by Congress with limited appropriation of $1,000,000.
  2 Includes $85,200,000 for completion of upper Mississippi River and $34,000,000 for
                                                                                                                    5 Estimated cost of completing all work on river and harbor projects as authorized
                                                                                                                  by Congress, including amounts required to complete projects for upper Mississippi
                                                                                                                                                                                                                        z
Missouri River, Kansas City to Sioux City, adopted by Congress with limited appro-                                River, Missouri River, Kansas City to Sioux City, and Connecticut River above Hart-
priations.                                                                                                        ford, which were adopted by Congress with limited appropriations.         However, the
  3 Of this amount $47,951,856.18 represents the value of plant distributed as follows:                           estimated cost of completing those projects now necessary in the interests of commerce
                                                                                                                  and navigation and on which local cooperation, if any be required, may be reasonably
                                                                                                                  expected within the next 2 years, is as follows:
                                                Construction        Service plant               Total
                                                   plant                                                          Projects adopted by Congress ....-     ------     ____-               $48, 326, 250
                                                                                                                  Projects adopted by Congress with limited appropriations------------- 119, 200, 000
                                                                                                                  Projects adopted by the Federal Emergency Administration of Public
River and harbor------------------             $26, 748, 445. 98                                                    Works-------------------------------------------------------------75, 951, 800
                                                                     $8, 510, 407. 52   $35, 258, 853. 50
Flood control- .....    .     ._.__              8, 584, 034. 76      4, 108, 967. 92    12, 693, 002. 68                                                                                                               FP

                                                                                                                                                                                                       243, 478, 050
       Total---- __---__----       -----         35, 332, 480. 74    12, 619, 375. 44    47, 951, 856. 18




                                                                                                                                                                                                                        co
                                   RIVERS   AND HARBORS                            15
  The War Department Appropriation Act of February 23, 1931,
made a lump-sum appropriation of $60,000,000 for river and harbor
improvements throughout the country. Certain allotments, amount-
ing to $59,998,692.54 were made from this appropriation and re-
ported in previous annual reports, leaving an unallotted balance of
$1,307.46. In addition, certain sums previously allotted have been
withdrawn and reallotted as follows:
Amount unallotted as shown in annual report for 1933---------- $1,307. 46
Amount withdrawn for reallotment elsewhere---------------1, 304, 956. 18

                                                                       1, 306, 263. 64
Allotted to-
    Gloucester Harbor, Mass--------------------------------        1, 307. 46
    Boston Harbor, Mass----------------------------------          8, 500. 00
    Pollock Rip Shoals, Nantucket Sound, Mass----------------15, 184. 74
    New Bedford and Fairhaven Harbor, Mass                         5, 500. 40
    Pawtucket (Seekonk) River, R. I-------------------------       4, 076. 61
    Coney Island Channel, N. Y__----------------------------          946. 01
    St. Johns River, Jacksonville to the ocean----------- -------  7, 791. 17
    Removal of water hyacinth, Mobile River, Ala., tributaries__   1, 584. 13
    Mississippi River, Ohio River to Illinois River (construction
       of dredge Dundee)       --------------------------------- 370, 000. 00
    Missouri River, Kansas City to Hermann, Mo. (construction
       of two 34-inch pipe-line dredges) ---------------------- 883, 822. 67
    Chicago Harbor, Ill-_  ----------------------------     -      2,400. 00
    Oswego Harbor, N. Y--        --------------------------------  4, 194.04

      Total---                                               , 305, 307. 23
                                                        --- 1----------------------------------
    Balance unallotted--------------- -----------------------        956. 41

       Total_ _---       --------------                               1, 306, 263. 64
  The War Department Appropriation Act approved July 14, 1932,
made a lump-sum appropriation of $60,000,000 for river and harbor
improvements throughout the country. Certain allotments, amount-
ing to $51,786,542.90, were made from this appropriation and re-
ported in a previous annual report, leaving an unallotted balance of
$8,213,457.10. In addition, certain sums previously allotted have
been withdrawn and reallotted as follows:
Amount unallotted, as shown in annual report for 1933--------$8, 213, 457. 10
Amount withdrawn for reallotment elsewhere_----------------    2,918, 226. 44

                                                                     11, 131, 683. 54

Allotted to-
    Portland Harbor, Maine--------------------------------               40, 000. 00
    Lynn Harbor, Mass___-----------       -------------------            15, 900. 00
    Boston Harbor, Mass __-______--- --------------------                 8,500. 00
    Plymouth Harbor, Mass--------------------------------                56,000. 00
    Cape Cod Canal, Mass___ ___         -      -____ ________  __--127,      204. 05
    Pollock Rip Shoals, Nantucket Sound, Mass--------------              26, 298. 10
    Pawtucket (Seekonk) River, R. I ----------------------              110, 702. 94
    Harbor of Refuge at Block Island, R. I_                               9, 749. 68
    Thames River, Conn----------------------------------                229, 000. 00
    Housatonic River, Conn---------------------------------               3, 500. 00
                          ---------------------------------
    Stamford' Harbor, Conn__                                             10, 000. 00
    Examinations, surveys, and contingencies (general), Provi-
       dence district  ------------------- -------------------            6, 297.59
    Glencove Creek, N. Y_____      _-------------------------            12, 300. 00
    East Rockaway (Debs) Inlet, N. Y_---------------------              265, 000. 00
      91536-ENCT     1934-2
16         REPORT OF CHIEF OF ENGINEERS,                               U. S. ARMY,     1934
              - -
Allotted to
    East River, N. Y----------------------------------------                             $40, 400. 00
    Hudson River Channel, N. Y --------------------                             ------- 40, 000. 00
    Hudson River, N. Y--------------------------------------                              50, 000. 00
    Shoal Harbor and Compton Creek, N. J-----------1,                                          000. 00
    Manasquan River, N. J----------------_--_----------___-                                9, 000. 00
    Little River, Del                                                                     15, 000. 00
     Salem River, N. J----------------------------------------                            35, 000. 00
    Cohansey River, N. J------------------                                            - 38, 000. 00
    Maurice River, N. J --------------------------------------                            33, 500. 00
    Examinations, surveys, and contingencies (general), Phila-
        delphia district __________-____-_______-__________--                             10, 000. 00
    Potomac River below Washington, D. C _____                            -__       -___       400. 00
    Rappahannock River, Va____ - __                            -__-_______ -_________ 1, 000.00
    Channel to Newport News, Va----------------------------                               20, 000. 00
    James River, Va__                                                                    280, 000. 00
    Waterway from Norfolk, Va., to sounds of North Carolina___                            42, 000. 00
    Inland waterway, Norfolk, Va., to Beaufort Inlet, N. C-----                          105, 500. 00
    Roanoke River, N. C-------------                                                         , 000. 00
                                                                                           1------------------------
    Intracoastal waterway, Cape Fear River, N. C., to Winyah
        Bay, S. C----------------------------------------------                          315, 000. 00
     St. Johns River, Fla., Jacksonville to the ocean-__                                 181, 283. 94
     St. Johns River, Fla., Palatka to Lake Harney________ _                              11, 068. 74
    Intracoastal waterway, Jacksonville to Miami, Fla
    Hollywood Harbor (Port Everglades), Fla________________
                                                                           ---------     290, 855. 67
                                                                                          15, 000. 00
    Miami Harbor (Biscayne Bay), Fla_______________.___.__.                              274, 618.58
    Miami River, Fla------------------------------------                                   5, 500. 00
    Caloosahatchee River and Lake Okeechobee drainage areas,
       Fla---------------------------------------------------                             10, 000. 00
    Tampa Harbor, Fla                                                           ___       41, 236. 09
    St. Petersburg Harbor, Fla_....                  ----____________-____-                    750. 00
    Withlacoochee River, Fla___                ____----------------------------------          300. 00
    Examinations, surveys, and contingencies (general), Jack-
       sonville district_____                ______           _____----__        _---    137, 914. 02
    Pensacola Harbor, Fla ------------------------------------                                 928. 51
    Gulfport Harbor and Ship Island Pass, Miss------------                                30, 312. 57
    Examinations, surveys, and contingencies (general), Mobile
       district_ -----------------------------------------                                29, 000. 00
    Southwest Pass, Mississippi River, La-- __---------------                            145, 008. 58
    Big Pigeon and Little Pigeon Bayous, La________-- -__                                  1, 552. 42
    Bayou Grossetete, La______                           -------------
                                                  -______----                             10, 000. 00
    Bayou Teche, La------------------------------------                                   15, 812. 56
    Louisiana-Texas intracoastal waterway (New Orleans-
       Sabine River section)----------------------------------                            75, 000. 00
    Examinations, .. surveys, and contingencies (general), New
       Orleans district______----------_______          __------------                     7, 904.10
     Galveston Channel,          Tex ___-____________---------------                         32, 250. 00
     Houston Ship Channel, Tex-------------------------------                              381, 752. 79
     Double Bayou, Tex_-----------------      ----------------                                  700. 00
     Anahuac .Channel, Tex------------------------------------                              12, 330. 00
     Examinations, surveys, and contingencies (general), Galves-
       ton district-------------------------------------------                               93, 000.   00
     Ouachita and Black Rivers, Ark. and La______________----                                78, 000.   00
     Mouth of the Yazoo River, Miss____________---------------                                5, 000.   00
     Yalobusha River, Miss------------------------------------                                3, 000.   00
     Arkansas River, Ark. and Okla                   _____--                                    55, 600. 00
                                                                                 _------------------
     Examinations, surveys, and contingencies (general), Mem-
      phis district-------------------------------------------                                7, 000. 00
     Mississippi River:
         Ohio River to Missouri River________----------------      __                       675, 027. 84
         Missouri River to Minneapolis, Minn___ ------------------                          704, 559. 76
     Missouri River:
         Mouth to Hermann, Mo-------------------------------                                 71, 000. 00
         Hermann to Kansas City, Mo---------------------                                    585, 000. 00
         Kansas City, Mo., to Nodaway River____--------------                               750, 000. 00
         Nodaway River to Sioux City, Iowa_ _----------------                               122. 000. 00
                               RIVERS   AND HARBORS                            17
Allotted to-
     Tennessee River__________________             _-                 $67, 002. 45
    Monongahela River, Pa. and W. Va__                                147, 000. 00
     Ohio River, lock and dam construction____________________        111, 280. 00
    Examinations, surveys, and contingencies (general) :
         Kansas City district- ..                                      75, 000.00
         Omaha district__        ______________________                 3, 000. 00
         Cincinnati district--------                                    1, 200. 00
         Louisville district____________________                        7, 000. 00
     Grand Marais Harbor, Minn_____                                    10, 000. 00
     Fox River, Wis-----                                              105, 000. 00
     Sturgeon Bay and Lake Michigan Ship Canal, Wis __ --. .            6, 000. 00
     Sheboygan Harbor, Wis_____________________________                 2, 500. 00
    Racine Harbor, Wis___ _-_ ________                                  3, 500. 00
    Kenosha Harbor, Wis_______________________           ___           18, 000. 00
     Saugatuck Harbor and Kalamazoo River, Mich__                       5,000. 00
    Pentwater Harbor, Mich __                                          15,000. 00
    Manistee Harbor, Mich_______----                                    5, 000. 00
    Chicago Harbor, Ill__           ____    _________________          15, 716. 26
    St. Marys River, Mich_____________________________                493, 862. 78
   St. Clair River, Mich                                              266, 258. 80
   Detroit Harbor, Mich_                                           1, 598, 520. 96
   Black River, Mich ___________---                                     3, 741.20
   Rouge River, Mich___                                                 5, 000. 00
   Monroe Harbor, Mich____________________________                    116, 000. 00
   Sandusky Harbor, Ohio        _                                      46, 800. 00
   Fairport Harbor, Ohio ......                                         1, 755. 78
    Dunkirk Harbor, N. Y_________-                                      4, 464. 08
    Rochester (Charlotte) Harbor, N. Y__                               38, 477. 76
    Los Angeles and Long Beach Harbors, Calif_                         36, 851. 79
    San Joaquin River, Calif_                                           6; 347. 55
    Mokelumne River, Calif_____________________                         9, 639. 24
    Sacramento River, Calif___                                         23, 562'. 77
    Examinations, surveys, and contingencies (general), Sacra-
      mento district___--------------------------------                98, 746. 79
    Coos Bay, Oreg_-----------------------------------                 25, 797.27
    Tillamook Bay and Bar, Oreg_____________________________           12, 100. 00
    Columbia River at the mouth, Oreg. and Wash__                      30, 000.00
    Skipanon Channel, Oreg_____---__-------                             3, 500. 00
    Columbia and Lower Willamette Rivers below Vancouver,
      Wash., and Portland, Oreg                                            500. 00
    Cowlitz River, Wash_____                    __________             25, 000. 00
    Willapa River and Harbor, Wash_______                              17, 950. 86
    Grays Harbor and Bar Entrance, Wash_                               14, 129. 47
    Tacoma Harbor, Wash .                   ___                          9,000. 00
    Seattle Harbor, Wash .....                                         54, 000. 00
    California Debris Commission __        __   _____    __             2, 933. 28
    Office, Chief of Engineers, examinations, surveys, and con-
      tingencies (general), board on beach erosion and sand
      movement                                                         10, 000. 00
    Surveys (H. Doc. No. 308, 69th Cong., 1st sess.)____ ____          40, 000. 00
    Transfer to reserve for impounded balances-------------           650, 000.00
          Total---------------------------------               11, 059, 657.62
    Balance unallotted---------------------------------------.      72, 025. 92
          Total-------------                                      11, 131, 683. 54

  The Emergency Relief and Construction Act approved July 21,
1932, made a lump-sum appropriation of $30,000,000 for river and
harbor improvements throughout the country. Certain allotments,
amounting to $29,941,452.07, were made from this appropriation and
reported in a previous annual report, leaving an unallotted balance
of $58,547.93. In addition, certain sums previously allotted have
been withdrawn and reallotted as follows:
18       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

Amount unallotted as shown in Annual Report for 1933-          -    - $58, 547. 93
Amount withdrawn for reallotment elsewhere--------------        ------ 855, 3913. 65
                                                                           913, 941. 58
Allotted to-
    Bridgeport Harbor, Conn__------------------------------------6, 252. 97
    Westchester Creek, N. Y------------------------------------1, 228. 05
    Intracoastal waterway, Jacksonville to Miami, Fla__-______ 135, 736. 12
    Missouri River, Nodaway River to. Sioux City-- --- _______ 176, 000. 00
    Tennessee River --------------------------------------- ---   130, 000. 00
    Allegheny River, Pa., lock and dam construction .- ______---_ 150, 000. 00
    Ohio River, open-channel work________-___________________      10, 000,. 00
    Fox River, Wis------                                               000. 00
                                                                    6,--------------------------
                       Y------------------------------------- 1224,
    Monroe Harbor, MichN.                                              000. 00
    Oswego Harbor, N. Y                                            18, 000. 00
    Los Angeles and Long Beach Harbors, Calif------------------ 54, 000. 00
       Total---------------------------------------              ----       11, 217. 14
     Balance unallotted------------------------                              2, 724. 44

       Total-----------------------                                        913, 941. 58
  The War Department Appropriation Act, approved March 4, 1933,
made a lump-sum appropriation of $39,388,129 for river and harbor
improvements throughout the country. Certain allotments, amount-
ing to $23,248,260.25, were made from this appropriation and
reported in a previous annual report, leaving an unallotted balance of
$16,139,868.75. In addition, certain sums previously allotted have
been withdrawn and reallotted as follows:
Amount unallotted as shown in Annual Report for 1933------ $16, 139, 868. 75
Amount withdrawn for reallotment elsewhere_________________  2, 325, 553. 61
                                                                        18, 465, 422.36

Allotted to-
     Portland Harbor, Maine________________________________           240, 000. 00
     Examinations, surveys, and contingencies (general), Bos-
       ton district-------------------------------------------         36, 500. 00
     Pollock Rip Shoals, Nantucket Sound, Mass ____________             4, 517. 16
     New London Harbor, Conn_____________________________              12, 000. 00
     Connecticut River below Hartford, Conn_________ _____             23, 000. 00
     Examinations, surveys, and contingencies (general), Provi-
       dence district---------------------------------------           10, 236. 16
     East Rockaway (Debs) Inlet, N. Y
     New York Harbor, N. Y., entrance channels______________
                                                                             8,
                                                                           000. 00
                                                                        8__________________
                                                                       24, 400.00
     Coney Island Channel, N. Y_____________________________           20, 900. 00
     Bay Ridge and Red Hook Channels, N. Y                             87, 000. 00
     East River, N. Y                                                   3, 941. 49
     Hudson River, N. Y           ____________________           ___  105, 000. 00
     New York Harbor, N. Y., collection of drift------------           58, 933. 41
    .Narrows of Lake Champlain, N. Y., and Vt ______________            1, 00. 00
     Examinations, surveys, and contingencies (general), first
       New York district ______________________________-43, 000. 00
     Newark Bay, Hackensack and Passaic Rivers, N. J _____-           170, 100. 00
     New York and New Jersey Channels____-- --                 ______ 104, 500. 00
     Raritan River, N. J____________________________________           28, 960. 14
     Elizabeth River, N. J -----------------------------------             306. 27
     Woodbridge Creek, N. J__________                                      733. 59
     Washington Canal and South River, N. J-----------                 16, 000. 00
     Keyport Harbor, N. J _____________________________                21, 000. 00
     Matawan Creek, N. J-------------------------------_                4, 000. 00
     Shrewsbury River, N. J-----           ----
                                       - ___          ----                   15, 500. 00
     Examinations, surveys, and contingencies (general), sec-
       ond New York district-----__        -__ --   - ---                   45, 000. 00
                                 RIVERS AND HARBORS                                          19
Allotted to--
    Delaware River, Philadelphia, Pa., to Trenton, N. J_ ___-                     $110, 000'. 00
    Delaware River, Pa., N. J., and Del., Philadelphia to the
       sea---------              ------ ---------                                1, 035, 300. 00
    Schuylkill River, Pa         -----------------------------                      340, 000. 00
    Absecon Creek, N. J-----------------------------                                 18, 000. 00
    Wilmington Harbor, Del_________________________                                 125, 000. 00
    Inland waterway, Delaware River to Chesapeake Bay, Del.
       and Md----------              ----------------------------                  293, 000. 00
    Smyrna River, DeL__-----------------                                            10, 000. 00
    Murderkill River, Del___                                                        13, 000. 00
    Examinations, surveys, and contingencies (general), Phila-
       delphia district --                                                           64, 000. 00
    Baltimore Harbor and Channels, Md-                                               58, 000. 00
    Broad Creek River, Del__                                                         10, 000. 00
    Twitch Cove and Big Thoroughfare River, Md_                                          272. 29
    E)xaminations, surveys, and contingencies (general), Balti-
       more district __           __                                                 21, 000. 00
    Potomac River at Washington, D. C-___------------                                49, 400. 00
    Potomac River below Washington, D. C_-------------                                   600. 00
    Rappahannock River, Va -------------------------                                 44, 000. 00
    Mattaponi River, Va____                                                           4, 500. 00
    Pamunkey River, Va                                                                6, 500. 00
    Examinations, surveys, and contingencies (general), Wash-
       ington (D. C.) district            _____---------------                      29, 000. 00
    Norfolk Harbor, Va                    -------------            ---------       298, 392. 07
    Willoughby Channel, Va____                                                       5, 000. 00
    Appomattox River, Va-                                                            9, 000'. 00
    Inland waterway, Norfolk, Va., to Beaufort Inlet, N. C_._                       33, 242. 46
    Roanoke River, N. C                -----------------------------                 9, 000. 00
    Scuppernong River, N. C                  --------------------------              5, 000. 00
    Manteo (Shallowbag) Bay, N. C_                                                   6, 000. 00
    Mackay Creek, N. C------------------------------                                 1, 500. 00
    Examinations, surveys, and contingencies (general), Nor-
      folk district----            -------------               -------------         40, 000. 00
    Far Creek, N. C-----------------                   ----------------              19, 500. 00
    Pamlico and Tar Rivers, N. C_______________-----------                           18, 600. 00
    Neuse River, N. CO                                                               10, 700. 00
    Contentnea Creek, N. C_ --------------------------                                1, 000. 00
    Trent River, N. C----                ----------------------------                    700. 00
    Waterway connecting Core Sound and Beaufort Harbor,
      N. C-----                                                                      5, 500. 00
    Cape Fear River, N. C., at and below Wilmington_                               221, 873. 62
    Northeast (Cape Fear) River, N. C--------___-----------                          4, 800. 00
    Black River, N. C--------------------------------                                3, 800. 00
    Examinations, surveys, and contingencies (general), Wil-
      mington (N. C.) district_                                                      14, 000. 00
    Winyah Bay to Charleston, S. C., waterway                                        60, 000. 00
    Charleston Harbor, S. C_                                                         50, 261. 79
    Shipyard River, S. C--                                                            5, 000. 00
    Waterway from Charleston to Beaufort, S. C                          ___          43, 200. 00
    Examinations,         surveys, and contingencies                (general),
       Charleston (S. C.) district__             ___                                17, 000. 00
    Savannah Harbor, Ga________________                                            345, 579. 70
    Savannah River below Augusta, Ga____________                                     9,401. 99
    Waterway between Beaufort, S. C., and St. Johns River,
      Fla.                                 _                                         70, 000. 00
    Brunswick Harbor, Ga                 _                                           98, 662.:53
    Examinations, surveys, and contingencies (general), Sa-
       vannah district--          ---------                                          12, 000. 00
    Intracoastal waterway, Jacksonville, Fla., to Miami, Fla___                      53, 000. 00
    Caloosahatchee River and Lake Okeechobee drainage areas,
       Fla          . ---                                                          348, 909. 22
    Withlacoochee River, Fla__                      _______                          3, 300. 00
    Apalachicola River, Fla., the cut-off, Lee Slough, and lower
       Chipola River----------------------------------                                4, 085. 22
20       REPORT OF CHIEF OF ENGINEERS, U.               S. ARMY,      1934

Allotted to-
    Channel from Apalachicola River to St. Andrews Bay, Fla_             $7, 500. 00
     Intracoastal waterway, Pensacola Bay, Fla., to Mobile Bay,
       Ala----------------------------------------------------           22, 000. 00
    Gulfport Harbor and Ship Island Pass, Miss--- ._______.               1, 630. 73
    Removal of water hyacinth, Mobile River, Ala., tributaries_           2, 584. 13
    Examinations, surveys, and contingencies (general), Mobile
       district-----------------------------------------------           48, 998. 40
    Southwest Pass, Mississippi River, La        ______________          84, 403. 93
    South Pass Channel, Mississippi River, La                             6, 000. 00
                                                                          0-----------
    Big Pigeon and Little Pigeon Bayous, La------___           _--_       7, 360. 33
    Louisiana-Texas intracoastal waterway (New Orleans-
       Sabine River section) ---------------------------------          409, 539. 74
    Removal of water hyacinth, Louisiana--                     _         314 273. 99
    Examinations, surveys, and contingencies (general), New
       Orleans district ---------------------------------------          12, 500. 00
    Louisiana-Texas intracoastal waterway (Sabine River-
       Corpus   Christi   section)    --                          _      30, 000. 00
     Aransas Pass-Corpus Christi Channel, Tex .      ._____________    108, 385.42
     Clear Creek, Tex---------------------------------------             7, 000. 00
     Port Aransas, Tex__              _________    _                    33, 194. 97
     Examinations, surveys, and contingencies (general), Gal-
       veston district----------------------------------                21, 188. 04
     Black River, Ark. and Mo                                               244. 35
     Mississippi River :
          Ohio River to Missouri River -----------------------         660, 806. 50
          Missouri River to Minneapolis_--                          1, 732, 556. 18
     Missouri River :
          Hermann, Mo., to mouth________________________               477, 000. 00
          Kansas City to Hermann, Mo__                                 740, 975. 76
          Kansas City, Mo., to Sioux City, Iowa-          --           220, 000.00
          Sioux City, Iowa, to Fort Benton, Mont-_             _         5, 735. 37
     Examinations, surveys, and contingencies (general) :
          St. Louis district ___________--_______-______                20, 000. 00
          Rock Island district                                          26, 0C0. 00
     Mill Creek and South Slough at Milan, Ill ________________          2, 000. 00
     St. Croix River, Wis. and Minn__.                                   8, 000. 00
     Examinations, surveys, and contingencies (general):
          St. Paul district                                             30, 000. 00
          Kansas City district                                          20, 000. 00
     Illinois River, Ill-----------------------------------            396, 900. 38
     Waukegan    Harbor,    Ill --.                                          5, 000. 00
     Chicago Harbor, Ill--                                               25, 400. 00
     Chicago River, Ill--------------------------------------            80, 000. 00
     Indiana Harbor, Ind                                                     600. 00
     Examinations, surveys, and contingencies (general), Chi-
       cago district------------------------------------------           75, 000. 00
     Tennessee River below Riverton, Ala_______ __-_____                 90, 000. 00
     Tennessee River above Riverton, Ala-------------------             140, 000. 00
     Examinations, surveys, and contingencies (general), Nash-
       ville district                                                    60, 000.   00
     Ohio River, lock and dam construction-------------------            60, 000.   00
     Ohio River, open-channel work_                                     720, 056.   07
     Youghiogheny River, Pa---------------------------                    3, 000.   00
     Kanawha River, W. Va---------------------------_                   632, 000.   00
     Examinations, surveys, and contingencies (general)"
          Pittsburgh district_-_____-_-     _________ ____               40, 000. 00
          Huntington district ---------------------------------
                                                      __                 20, 000. 00
         Zanesville district     ------------                            10, 000.00
         Cincinnati district ------------------------------ ___          33, 500. 00
         Louisville district_------------------------------              22, 500. 00
     Grand Marais Harbor, Minn-----------------------------              10, 000. 00
     Duluth-Superior Harbor, Minn. and Wis________--_                    26, 000. 00
     Ontonagon Harbor, Mich----                                          13, 000. 00
     Keweenaw Waterway, Mich ------------------                          53, 000. 00
                               RIVERS AND HARBORS                                     21
Allotted to-
    Marquette Harbor, Mich_                                                  $11, 000. 00
     Grand Marais, Harbor of Refuge, Mich_____ ____                           10, 000. 00
    Warroad Harbor and River, Minn______                                       9, 000. 00
    Examinations, surveys, and contingencies (general), Duluth
       district ....                     _.__                                 15, 000. 00
    Manistique Harbor, Mich___             ____                                2, 000. 00
    Menominee Harbor and River, Mich. and Wis .__.__                          17, 000. 00
    Green Bay Harbor, Wis ____               ______ ________                  18, 500. 00
    Fox River, Wis--                                                          63,000. 00
     Sturgeon Bay and Lake Michigan Ship Canal, Wis_______                    28, 000. 00
    Algoma Harbor, Wis                                                         2, 000. 00
     Kewaunee Harbor, Wis__               ______                     ___      10, 000. 00
    Two Rivers Harbor, Wis___----                                             14, 000. 00
    Manitowoc Harbor, Wis                                                     28, 600. 00
     Sheboygan Harbor, Wis________________                   _____            22, 000. 00
     Port Washington Harbor, Wis______                                         3, 000. 00
     Racine Harbor, Wis________________________________                        2, 000. 00
     Kenosha Harbor, Wis          _______           __      _____             47, 861. 98
     St. Joseph Harbor, Mich______________________________                    91, 000. 00
     South Haven Harbor, Mich_______                   ____   __              22, 000. 00
     Holland Harbor, Mich .. __ __                _____                       20, 000. 00
     Grand Haven Harbor and Grand River, Mich __.___...                       55, 000. 00
     Muskegon Harbor, Mich_                                                   77, 000. 00
     White Lake Harbor, Mich            _____          __    __                9, 000. 00
     Ludington Harbor, Mich           _________        ____________           10, 000. 00
     Manitee Harbor, Mich_ .___                                                9, 000. 00
     Portage Lake Harbor, Mich___                                             25, 000. 00
     Frankfort Harbor, Mich_______                                            58, 000. 00
     Charlevoix Harbor, Mich                  ____________________             5, 000. 00
     Examinations, surveys, and contingencies (general), Mil-
       waukee district_-        _                                             13, 000. 00
     St. Clair River, Mich            _                                       70, 000. 00
     Saginaw River, Mich_                                                    119, 000. 00
     Black River, Mich___                                                      6, 500. 00
     Rouge River, Mich__                                                      17, 000. 00
     Toledo Harbor, Ohio__                ______       ______                 23, 000. 00
     Examinations, surveys, and contingencies (general), De-
       troit district    --                                                   31, 000. 00
     Sandusky Harbor, Ohio .. __....                      _________           24, 500. 00
    Huron Harbor, Ohio____               __________________________            2, 415. 16
    Lorain Harbor, Ohio         ____                                          18, 436. 51
     Fairport Harbor, Ohio ____________________________                       21, 000. 00
    Ashtabula Harbor, Ohio            __         ____                          7, 000. 00
     Conneaut Harbor, Ohio_                                                   22, 500. 00
     Erie Harbor, Pa_        --                                                4, 900. 00
     Buffalo Harbor, N. Y         _                                          214, 659. 03
     Black Rock Channel and Tonawanda Harbor, N. Y __..                       47, 500. 00
     Rochester (Charlotte) Harbor, N. Y_________________                       8, 200. 00
     Great Sodus Bay Harbor, N. Y____                  ____                    3, 200. 00
     Little Sodus Bay Harbor, N. Y_________________________                    2, 700. 00
     Oswego Harbor, N. Y_---                  ---                             27, 000. 00
    Ogdensburg Harbor, N. Y_                                                   8, 100. 00
    Examinations,     surveys, and contingencies              (general),
       Buffalo district-        --------                                      55, 925. 09
    Los Angeles and Long Beach Harbors, Calif                    -__           3, 200. 00
    Examinations, surveys, and contingencies (general), Los
       Angeles district_----                                                       906.51
    Oakland Harbor, Calif                                                       5, 000. 00
    Richmond Harbor, Calif ._____                 _____ -      _____           30, 000. 00
     Monterey Harbor, Calif_                                                       800. 00
     Sacramento River, Calif____             _______                           32, 700. 00
     Columbia River at mouth, Oreg. and Wash ____                          1, 220, 000. 00
     Cowlitz River, Wash__________________                                      3, 000. 00
     Skamokawa Creek, Wash__            _____                                   2, 700. 00
22       REPORT     OF CHIEF       OF ENGINEERS,     U.        S. ARMY,   1934

Allotted to-
    Willamette River above Portland, and Yamhill River,
       Oreg------------------------                                          $51, 300. 00
    Examinations, surveys, and contingencies (general), Port-
       land district                                                          18, 300. 00
    Willapa River and Harbor, Wash-- ----------------------                     9,049. 14
    Kahululi Harbor, Hawaii-------------------------------                     3, 782.30
    Survey of northern and northwestern lakes--------------                   29, 000. 00
     Supervision New York Harbor_---                --------                 175, 000. 00
     Office, Chief of Engineers:
           Printing (sec. 6, River and Harbor Act approved July
             3, 1930) -----------------------------------------               35, 000. 00
           Services -------------------------------------------              193, 955. 00
          Contingencies ---------------------------            ---            30, 000. 00
     Board of Engineers for Rivers and Harbors:
           Services---------------          -- ---------------     _         145, 000. 00
         Contingencies   ---------------------------------------              34, 400. 00

       Total                  -----------------                           15, 891, 534. 12
     Balance unallotted --------------------------------------             2, 573, 888. 24
       Total                                                              18, 465, 422. 36
   The War Department Appropriation Act approved April 26, 1934,
contained the following provisions:
   That the following sums are appropriated, out of any money in the
Treasury not otherwise appropriated, for the military and nonmili-
tary activities of the War Department for the fiscal year ending
June 30, 1935, and for other purposes, namely:
                               RIVERS AND HARBORS

   To be immediately available and to be expended under the direc-
tion of the Secretary of War and the supervision of the Chief of
Engineers:
   For the preservation and maintenance of existing river and harbor
works, and for the prosecution of such projects heretofore author-
ized as may be most desirable in the interests of commerce and navi-
gation; for survey of northern and northwestern lakes, and other
boundary and connecting waters as heretofore authorized, including
the preparation, correction, printing, and issuing of charts and
bulletins, and the investigation of lake levels; for prevention of
obstructive and injurious deposits within the harbor and adjacent
waters of New York City; for expenses of the California Debris
Commission in carrying on the work authorized by the act approved
March 1, 1893 (U. S. C., title 33, sec. 661) ; for examinations, sur-
veys, and contingencies of rivers and harbors; and for printing,
including illustrations, as may be authorized by the Committee on
Printing of the House of Representatives, either during a recess or
session of Congress, of surveys under House Document No. 308,
Sixty-ninth Congress, first session, and section 10 of the Flood Con-
trol Act, approved May 15, 1928 (U. S. C., supp. VI, title 33, sec.
702j), and such surveys as may be printed during a recess of Con-
gress shall be printed as documents of the next succeeding session
of Congress, and for the purchase of motor-propelled passenger-
carrying vehicles and motor boats, for official use, not to exceed
$122,417: Provided, That no funds shall be expended for any pre-
liminary examination, survey, project, or estimate not authorized by
                                       RIVERS AND   HARBORS                                   23
law, $23,966,645, of which sum $50,000 shall be available, under the
direction of the President, for conducting a survey of Governors
Island, N. Y., to determine its usefulness and adaptability as an
airport and the cost of accomplishing all work incidental to effect-
ing the change.
  From this lump-sum appropriation the following-named sums
have been allotted to the localities indicated:
Georges River, Maine_____ _--------------------------                                $27, 500
York Harbor, Maine_----------------------------------------                           11, 000
Boston Harbor, Mass                   --------------------------------------          26, 000
Cape Cod Canal, Mass---------------------------------------                           87, 000
Examinations, surveys, and contingencies (general), Boston dis-
   trict ----------------------------------                                           29:, 000
Pollock Rip Shoals, Nantucket Sound, Mass--------------------                         40, 000
Cross Rip Shoals, Nantucket Sound, Mass__________-__--------                            6, 000
Norwalk Harbor, Conn--------------------------------------                            43, 000
Examinations, surveys, and contingencies (general), Providence
  district_------------------------------------------------                           10, 000
Mamaroneck Harbor, N. Y--------------------------------------                           6, 000
Glencove Creek, N. Y------------------------------------                              21, 000
Huntington Harbor, N. Y _______-----------------------------------                    15, 000
New York Harbor, N. Y -------- ------- ---------------                         - --- 165, 000
Bay Ridge and Red Hook Channels, N. Y--------------- -----                           200, 000
Newtown Creek, N. Y-------                                             -------        18, 800
Hudson River Channel, N. Y------------                             --------------    165, 000
New York Harbor: Collection of drift-__-                  -_______-___                43, 000
Rondout Harbor, N. Y                   -------------------------------------- 13, 000
Saugerties Harbor, N. Y--------                                                       10, 000
Hudson River, N. Y-----------------------------------250,                                   400
Burlington Harbor, Vt --------------------------------------                            5, 000
Examinations, surveys, and contingencies (general), first New
   York district              --------------------------------------                  25, 000
Newark Bay, Hackensack and Passaic Rivers, N. J                                      126, 000
New York and New Jersey Channels                                                      26, 000
                                                                                     1-------------------------
Elizabeth River, N. J----_-_ ---                                                      15, 000
Woodbridge Creek, N. J--------------------------------------                          15, 000
Raritan River, N. J----------------------------------------                           30, 000
Washington Canal and South River, N. J-----------                                           00
                                                                                        9_____--,
Shoal Harbor and Compton Creek, N. J------------------------                          12, 000
Shrewsbury River, N. J----------------                                                16, 000
Manasquan River, N. J--------------------------------------                           15, 000
Examinations, surveys, and contingencies (general), second New
   York district--------------------------------------------                          17. 000
Delaware River between Philadelphia, Pa., and Trenton, N. J----                       70, 000
Delaware River, Pa., N. J., and Del., Philadelphia to the sea              ------    350, 000
Schuylkill River, Pa-----------------------------------------                          80, 000
Cooper River, N. J-----------------------------------------                           27, 000
Woodbury Creek, N. J __________________-____________                              _   10, 000
Mantua Creek, N. J               ------------------------------------------             5, 000
Wilmington Harbor, Del------                   ---------      DDDDDDD161,000
Inland waterway, Delaware River to Chesapeake Bay, Del., and Md_                     173, 880
Mispillion River, Del               ------------------------------------              10, 000
Broadkill River, Del_________                    ___________                             7, 500
Inland waterway, Chincoteague Bay, Va., to Delaware Bay, Del_                               300
Examinations, surveys, and contingencies (general), Philadelphia
  district --------------------------------------------------
                                               __                                     35, 000
Baltimore Harbor and Channels, Md--------------------------200,000
Wicomico River, Md ________________________-                         _______ -         14, 200
Examinations, surveys, and contingencies (general), Baltimore
   district----------------------___                                                       8, 000
Occoquan Creek, Va     ------------------------------------------                         12, 000
Examinations, surveys, and contingencies (general), Washington,
  D. C., district --------------------------------------------                            35, 000
Norfolk Harbor, Va_________,_                                                            108, 500
24         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY                        1934

Thimble Shoal Channel, Va---------------------------------_                       $70, 500
JamesJame
        River, Va__                          _________ _____
        Rivr, V--------------------------------------------3740           __       37, 400
Waterway from Norfolk, Va., to the sounds of North Carolina___                      5, 000
Inland waterway from Norfolk, Va., to Beaufort Inlet, N. C_____                   227, 700
Meherrin River, N. C-------------------------------------------                     4, 000
Roanoke River, N. C--------------------------------------------                     4,800
Examinations, surveys, and contingencies (general), Norfolk district-              40, 000
Pamlico and Tar Rivers, N. C__________________________________                     12, 500
South River, N. C-----------------------------------------------                   15, 000
Neuse River, N. C---------------------------------------------                      3, 500
Swift Creek, N. C-----------------------------------------------                       350
Trent River, N. C-----------------------------------------------                    2, 400
Channel connecting Thoroughfare Bay with Cedar Bay, N. C_.....                      5, 000
Beaufort Harbor, N. C-----------------------------------------                     14, 500
Inland waterway, Beaufort to Cape Fear River, N. C., including
  waterway to Jacksonville, N. C_________________________ ___100,                      000
Cape Lookout, N. C., harbor of refuge----------------------------                   2, 000
Cape Fear River at and below Wilmington, N. C----           ---------------       180, 000
Northeast (Cape Fear) River, N. C-----------------------------                      1, 600
Black River, N. C ---------------------------------------------                        800
Examinations, surveys, and contingencies (general), Wilmington,
  N. C., district -------------------------------------------------                11, 000
Winyah Bay, S. C__                                                                 19, 600
Waccamaw River, N. C. and S. C_______ __                    ____1_____________     13,500
                            ..--.---
Great Peedee River, S.C_--__----------                                 _____      - 5, 000
Charleston Harbor, S. C________________________-_______-                     __    10, 800
Examinations, surveys, and contingencies (general), Charleston
  district -------------------------------------------------------                   6,100
Savannah Harbor, Ga -_ ___-                                                       210, 000
Savannah River below Augusta, Ga                                                   67, 000
Waterway between Beaufort, S. C., and St. Johns River, Fla.:
    Beaufort, S. C., to Cumberland Sound section                                   44, 100
    Cumberland Sound to St. Johns River section                                    22, 000
Altamaha, Oconee, and Ocmulgee Rivers, Ga__                                        34, 000
Brunswick Harbor, Ga -------------------                                           12, 700
Examinations, surveys, and contingencies (general), Savannah dis-
   trict                      _                                                    14, 000
Intracoastal waterway, Jacksonville to Miami, Fla           _                     120, 000
St. Johns River, Fla., Jacksonville to the ocean__________________                270, 000
St. Johns River, Fla., Palatka to Lake Harney                                      40, 000
Oklawaha River, Fla_______________                                                   5, 000
Fort Pierce Harbor, Fla                                                            50, 000
Lake Worth Inlet, Fla___________________________________                           30, 000
Hollywood Harbor, Fla___________________________________                           30, 000
Miami Harbor (Biscayne Bay), Fla_________________________                  __       10, 500
Key West Harbor, Fla---..........._-                                                27, 000
Caloosahatchee River and Lake Okeechobee drainage areas, Fla                    1, 130, 500
Charlotte Harbor, Fla------                     -          --                      58, 000
Tampa Harbor, Fla___                                                               30, 000
Channel from Clearwater Harbor through Boca Ciega Bay to Tampa
  Bay,Fla-        _____                                                            10, 000
Anclote River, Fla_________________________________-__                             121, 000
Removing water hyacinth from navigable waters in the State of
  Florida__ _       -_                  _-_                                          7, 000
Examinations, surveys, and contingencies            (general),   Jacksonville
  district------------------------------                                           59, 000
Apalachicola Bay, Fla .....              --                                        14, 000
Channel from Apalachicola River to St. Andrews Bay, Fla__--....                     1, 000
St. Andrews Bay, Fla-----------------------------                                  37, 600
Narrows in Santa Rosa Sound, Fla               _                                    7, 000
Pensacola Harbor, Fla__                                                            16, 100
Intracoastal waterway from Pensacola Bay, Fla., to Mobile Bay,
  Ala------ -- _------   -              --                    ---                  18, 300
Alabama River, Ala_---------------_                                                 4, 000
Mobile Harbor, Ala .-.----                 -    -     -     -     -               254, 000
Intracoastal waterway, Mobile, Ala., to New Orleans, La_ ........                  14, 000
                                                      RIVERS AND HARBORS                      25
Black Warrior, Warrior, and Tombigbee Rivers, Ala                                         $20, 000
Pascagoula Harbor, Miss                                                                    28, 000
Gulfport Harbor and Ship Island Pass, Miss                                                 82, 000
Removing water hyacinth, Mobile River, Ala., tributaries-........                           5, 100
Southwest Pass, Mississippi River, La-------------                                        332, 000
Mississippi River between Baton Rouge and New Orleans, La ......                           17, 000
Bayou Grossetete, La              -------------------                                      10, 000
Barataria Bay, La                 --------------------------                               10, 000
Chefuncte River and Bogue Falia, La                                                         5, 000
Tangipahoa River, La_-------  -       -----------                                           5, 000
Tickfaw, Natalbany, Ponchatoula, and Blood Rivers, La.                                      5, 000
Little Caillou Bayou, La---------------                                                    15, 000
Big Pigeon and Little Pigeon Bayous, La--                                                   1, 000
Bayou Teche, La------------------------                                                     4, 000
Louisiana-Texas intracoastal waterway (New Orleans-Sabine River
   section) __ ___
            secion
                           __        _195,
              -----------------------------------------------
                                                                                             000
Bayou Vermilion, La _          _____________                                             50, 000
Mermentau-River and Bayous Nezpique and des Cannes, La .......                           15, 000
Removing water hyacinth, State of Louisiana--------------------                          38,000
Examinations, surveys, and contingencies (general), New Orleans
   district-------------------------------------------------------                       28,000
Sabine-Neches Waterway, Tex-----------------------------------                          100, 000
Louisiana-Texas Intracoastal Waterway                       (Sabine River-Corpus
   Christi section) -----------------------------------------------                      64, 000
Galveston Harbor, Tex____________-__----------------------                              100, 500
Galveston Channel, Tex__------------------------------------------                       73, 500
Channel from Galveston Harbor to Texas City, Tex----------------                         88, 800
Houston Ship Channel, Tex-------------------------------------                          133, 000
Freeport Harbor, Tex--------------------------------------------                         77, 000
Channel from Aransas Pass to Corpus Christi, Tex-----------------                        85, 000
Port Aransas, Tex---------------------------------------------                          297, 000
Brazos Island Harbor, Tex --------------------                                            5, 200
Examinations, surveys, and contingencies (general), Galveston
   district-------------------------------------------------------                       20, 000
Red River below Fulton, Ark ------------------------------------                         30, 000
Cypress Bayou and Waterway between Jefferson, Tex., and Shreve-
   port, La------------------------------------------------------                         1, 700
Ouachita and Black Rivers, Ark. and La -------                       ______--------100, 000
Tensas River and Bayou Macon, La                                    --                    2, 500
Boeuf River, La -------------------------------------------------                         2, 500
Yazoo River, Miss----------------------------------------------                          10, 500
Big Sunflower River, Miss ______--___                                                     4, 000
Mouth of the Yazoo River, Miss_________________________ -                             -   5, 000
Examinations, surveys, and contingencies (general) Vicksburg
   district------------------------------------------------------                        11, 000
Arkansas River, Ark. and Okla_____ _______________---8,                                      660
White River, Ark. and Mo--------------------------------------                          127, 670
Black River, Ark. and Mo--------------------------------------                           18, 170
Current River, Ark. and Mo --____-____-- ____-________-                     - _____--     2, 900
St. Francis and L'Anguille Rivers and Blackfish Bayou, Ark .....                          8, 770
Examinations, surveys, and contingencies (general), Memphis dis-
   trict ---------------------------------------------------------                       12, 430
Mississippi River:
      Ohio River to Missouri River_____________________
                                                ...                        _       _    865, 600
      Missouri River to Minneapolis, Minn------------------------ 1, 359, 500
Missouri River, Kansas City to mouth (Hermann to mouth)
Mill Creek and South Slough at Milan, Ill------------------------
                                                                                ------  697, 500
                                                                                          2,000
St. Croix River, Minn. and Wis___ ____________________________                            3, 000
Examinations, surveys, and contingencies (general), St. Louis
   district_-------------------------------------------------------                      15, 000
Illinois River, Ill_-----------------------------------------------_                    686, 500
Examinations, surveys, and contingencies (general) Chicago district
   (portion in upper Mississippi Valley division)                    ------------------  50, 000
Agate Bay Harbor, Minn__                                                                 10, 000
Duluth-Superior Harbor, Minn. and Wis_-                                                  36, 000
Ashland Harbor, Wis_---------------------------------------------                        14, 000
26        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

Ontonagon Harbor, Mich---- --------------------------------                       $42, 000
Keweenaw Waterway, Mich---------------------------------                          113, 000
Marquette Bay, Harbor of Refuge, Mich .-.-           ---------------          -       5, 000
Marquette Harbor, Mich--------------------------------------                        14, 000
Warroad Harbor and River, Minn---__-----------------                                15, 000
Baudette Harbor and River, Minn__----------------                                     8, 000
Examinations, surveys, and contingencies (general), Duluth district_                23, 000
Manistique Harbor, Mich_------------        --------------------------                5, 500
Menominee Harbor and River, Mich. and Wis --------------------                      10, 500
Green Bay Harbor, Wis-------        -------------------------------                 25, 000
Fox River, Wis--------------------------------------------                          96, 000
Sturgeon Bay and Lake Michigan Ship Canal, Wis-------                  ___--39,          000
Two Rivers Harbor, Wis--------------------------------------                        11, 000
Sheboygan Harbor, Wis---------------------------------------                        18, 000
Port Washington Harbor, Wis---------------------------------                          4, 000
Racine Harbor, Wis-----------------------------------------                         13, 000
Kenosha Harbor, Wis-.                                                                 6, 000
St. Joseph Harbor, Mich_____________--------------------------------------           11, 000
South Haven Harbor, Mich____________---
                                     -      -      -     -__-_______                  7, 000
Holland Harbor, Mich-____-____- --            _____-          -____-___ -      --     5, 000
Grand Haven Harbor and Grand River, Mich ---            __--- ---------              49, 000
Muskegon Harbor, Mich                  -       -     __1___________               1_______________--
                                                                                  105,300
White Lake Harbor, Mich-                 -       -          __ -_____                 6_______-
                                                                                      6, 000
Manistee Harbor, Mich ------- _____-____-______-__                          _-      17, 500
Portage Lake Harbor, Mich------------------------------------                         4, 000
Frankfort Harbor, Mich________________-______________                                76, 000
Charlevoix Harbor, Mich-_____
                            -        ________         _- ________       __-- -           500
Examinations, surveys, and contingencies (general), Milwaukee dis-
   trict -  ----------------------------------------------------                      4, 000
Waukegan Harbor, Ill                                              ____-_ _-----__-_______________
                                                                                    11, 000
Chicago Harbor, Ill                                                                  77, 000
                                                                                   1------------------------
Chicago River, Ill_______________          __      _________                         13, 000
Calumet Harbor and River, Ill. and Ind-__- ----            _____---__-               29, 300
Indiana Harbor, Ind._________________-_______                                        68, 100
Michigan City Harbor, Ind-- ----------------------------------                      16, 300
Examinations, surveys, and contingencies (general), Chicago district
    (portion in Great Lakes division) -----------------------------                  21, 000
St. Clair River, Mich_______________________               ________                 10, 000
Detroit River, Mich--------------1,                                                851, 000
Black River, Mich--------------------------------------------                        5, 000
Rouge River, Mich --                                                                    1----------------
                                                                                         8, 200
Toledo Harbor, Ohio ___--------------                                                     5, 000
Sandusky Harbor, Ohio----------------------                                             18, 700
Huron Harbor, Ohio------------------------------------------                             8, 200
Lorain Harbor, Ohio _ ------------------------------------                              19, 300
Fairport Harbor, Ohio -__-___--_                                                         8, 200
Ashtabula Harbor, Ohio                                                                     , 600
                                                                                         6---------------------
Erie Harbor, Pa_          ----------------                                              26, 700
Buffalo Harbor, N. Y___            __________________________________                   40, 000
Black Rock Channel and Tonawanda Harbor, N. Y________________                           16, 600
Great Sodus Bay Harbor, N. Y--                 _____________________________             5, 200
Oswego Harbor, N. Y__-----------------------------------------                           4, 000
Ogdensburg Harbor, N. Y -------------------------------------                            4, 500
Examinations, surveys, and contingencies (general) :
     Buffalo district------------------------------------------                         15, 000
     Los Angeles district--------------------------------------                         19, 000
San Francisco Harbor, Calif---- ------------------------------                          69, 200
Oakland Harbor, Calif------ ---------------------------------                           15, 700
San Pablo Bay and Mare Island Strait, Calif---------------------                        81, 500
Humboldt Harbor and Bay, Calif------------------------------                            32,100
Examinations, surveys, and contingencies (general), San Fran-
  cisco district ---------------------------------------------                          21, 500
San Joaquin River, Calif---            -------------         --------------------       80, 000
Stockton and Mormon Channels (diverting canal), Calif                                    5, 000
Mokelumne River, Calif_----                 --------                   -      -     -     2, 000
Sacramento River, Calif_--                ----------                                    150, 000
      THE BOARD OF ENGINEERS FOR RIVERS AND HARBORS                                     27
Middle River and Empire Cut, Calif-----------------------------                      $500
Suisun Bay Channel, Calif___          ------------------------------------         22, 500
Examinations, surveys, and contingencies (general), Sacramento
  district       -------------------------------------------------                 15, 000
Tillamook Bay and Bar, Oreg__---------------------------------                     16, 000
Columbia and Lower Willamette Rivers below Vancouver, Wash.,
  and Portland, Oreg---                  ----------       -------------  ----     595, 000,
Willamette River above Portland, and Yamhill River, Oreg--------                   62, 000
Lake River, Wash---------------------------                  ----------------       2, 000
Lewis River, Wash------------------------------------------                         1, 000
Cowlitz River, Wash----------------------------------------                        10, 000
Grays River, Wash------------------- ---                                               500
Deep River, Wash---------------------------------------------                          250
Examinations, surveys, and contingencies (general), Portland
  district--------                -------------------              -               23, 250
Willapa River and Harbor, Wash------------------------------                       34, 000
Grays Harbor and Bar entrance, Wash-------------------------                      116, 000
Grays Harbor, inner portion, and Chehalis River, Wash------------                  12, 000
Puget Sound and its tributary waters, Wash----------------------                   22, 400
Bellingham Harbor, Wash-----------------------------                               20, 000
Nome Harbor, Alaska                       ----------------------------------       22, 000
Examinations, surveys, and contingencies (general), Seattle district               47, 000
San Juan Harbor, P. R---------------------------------------                       12, 000
Examinations, surveys, and contingencies (general), Puerto Rico
  district-----------------------------                       ---                    5, 000
Treatment of the Yuba River debris situation-restraining barriers-                   5, 000
Regulation of hydraulic mining-expenses of the California Debris
  Commission----------------------------------------------                         10, 000
Supervision New York Harbor--------------------------------                       162, 000
Survey of northern and northwestern lakes----------------------                   175, 000
Surveys (H. Doc. No. 308, 69th Cong., 1st sess.) -------------------                1, 000

      Total-   ---------------------                   --        -------- 17, 359, 530
Balance unallotted                                                          , 607, 115
                                                                           6---------------------------------------

       Total------      ------      -----------------------------             23, 966, 645
  The amounts that can be profitably expended during the fiscal
year ending June 30, 1936, as indicated in the respective reports, are
as follows:
Maintenance and improvement of existing river and
harbor works:
    Projects authorized by Congress----             $47, 164, 115
    Less estimated carry-over from previous appro-
      priations          --------------------------   2, 214, 095

    Amount to be. appropriated-----------------              $44, 950. 020
    Projects authorized by the Federal Emergency Administra-
      tion of Public Works-------------------------------     93, 816, 610
Flood control-------------------------------- $28, 906, 768
    Less estimated carry-over from previous appro-
      priations------------------------------- 12, 588, 112

     Amount to be appropriated-----------------------------16, 318, 656

       Total to be appropriated                ------------                  155, 085, 286

             THE BOARD OF ENGINEERS FOR RIVERS AND HARBORS


   The creation of the Board and the duties assigned to it under the
original and subsequent acts of Congress are described in the Annual
Report for 1922.
28         REPORT       OF CHIEF           OF ENGINEERS,               U.    S.   ARMY,        1934


   The work accomplished by the Board during the year and the
status of its operations from its organization up to the close of the
fiscal year are shown by the following table:

                                                                               Total  Number
                                                                      Number num      complet- Number
                                                                       of in- complet-eddur- remain-
                 Authority forinvestigations                          vestiga--    lose of    ing year   ing to
                                                                       tions                 ending      be com-
                                                                      ordered      preced- June 30,      pleted
                                                                                  ing fiscal  1934
                                                                                    year

River and harbor and flood control acts__----------                      3, 238      3,058         98             82
Concurrent resolutions of Congress-._._-.... ..-                             1          1
Senate resolutions---------------------                                       1          1-
Resolutions of congressional committees-         __ ..-------------         664        454         75         135

     Total .      ---            ---               -   -----------      3,904        3,514        173         217



Number of hearings given at the office of the Board during
  the year______             __---------------------                                                          35
Net expenses of the Board during the year ___-__..___ ___--                                       $169, 822. 46
Estimated cost of projects recommended by the Board from
  its organization to June 30, 1934------------------                                 _ 1,'032, 027, 929.06
Estimated cost of projects so recommended adopted by Con-
gress ----------------------------------------------                                         583, 98,   512. 26
   Further progress has been made in the preparation and revision of
the series of reports on the principal ports of the United States de-
signed to further the interests of importers, exporters, ship operators
and others concerned in the movement of goods through our ports.
During the fiscal year ending June 30, 1934, revisions of the follow-
ing reports were prepared for publication: Charleston, S. C., and
Wilmington, N. C. (no. 9); and the Panama Canal and its ports
 (no. 22). One new report was similarly prepared on the Ports of
Northern New England (no. 24).                            A revision of the report on Nor-
folk, Portsmouth, and Newport News, Va. (no. 15), was nearing
completion at the close of the year.
  The following reports were distributed: Port Arthur, Sabine,
Beaumont, and Orange, Tex. (no. 14) ; Baltimore, Md. (no. 16) ; and
New York (no. 20). A report on San Francisco, Oakland, Berkeley,
Richmond, Upper San Francisco Bay, Santa Cruz, and Monterey,
Calif. (no. 12), was completed and will be distributed early in the
next fiscal year.
The following is a list of the Port Series reports and revisions
which have been issued to date:
   No. 1. The Port of Portland, Maine, and one revision.
   No. 2. The Port of Boston, Mass., and one revision.
   No. 3. The Ports of Mobile, Ala., and Pensacola, Fla., and one revision in two
parts.
   No. 4. The Ports of Philadelphia and Chester, Pa., Camden, N. J., and Wil-
mington, Del., and one revision in two parts.
   No. 5. The Port of New Orleans, La., and one revision.
   No. 6. The Ports of Galveston, Houston, and Texas City, Tex., and one re-
vision in three parts, one of which includes Corpus Christi.
   No. 7. The Ports of Seattle, Tacoma, Everett, Bellingham, and Grays Har-
bor, Wash., and one revision in three parts.
   No. 8. The Ports of Jacksonville, Fernandina, Miami, Key West, Tampa,
and South Boca Grande, Fla., and one revision in two parts.
   No. 9. The Ports of Charleston, S. C., and Wilmington, N. C.
   No. 10. The Ports of Savannah and Brunswick, Ga.
        THE BOARD OF ENGINEERS FOR RIVERS AND HARBORS                       29
  No. 11. The Ports of Portland and Astoria, Oreg., and Vancouver, Wash.,
and one revision in two parts.
  No. 12. The Ports of San Francisco, Oakland, Berkeley, Richmond, Monterey,
Santa Cruz, and Upper San Francisco Bay, Calif.
  No. 13. The Ports of Los Angeles, San Diego, and San Luis Obispo, Calif., and
one revision in two parts.
  No. 14. The Ports of Port Arthur, Sabine, Beaumont, and Orange, Tex.,
and one revision.
  No. 15. The Ports of Norfolk, Portsmouth, and Newport News, Va.
  No. 16. The Ports of Baltimore, Md., Washington, D. C., and Alexandria, Va.,
and one revision on Baltimore.
  No. 17. The Ports of Hawaii.
  No. 18. The Ports of Southern New England.
  No. 19. The Ports of Gulfport and Pascagoula, Miss.
  No. 20. The Port of New York (in three parts), and one revision.
  No. 21. The Ports of Puerto Rico.
  No. 22. The Panama Canal and its Ports.
  No. 23. The Ports of Olympia and Port Angeles, Wash.
   A Lake Series of reports, similar in form and scope to the Port
Series, has been published and the following numbers have been
issued to date, though no new ones were distributed during the year.
  No.   1. The   Port of Buffalo, N. Y.
  No.   2. The   Port of Detroit, Mich.
  No.   3. The   Port of Milwaukee, Wis.
  No.   4. The   Port of Chicago, Ill.
  No.   5. The   Port of Cleveland, Ohio.
  No.   6. The   Port of Duluth-Superior, Minn. and Wis.
  No.   7. The   Port of Toledo, Ohio.
  No.   8. The   Ports of Sandusky, Huron, and Lorain, Ohio.,
  A Transportation Series of reports has also been published in which
are included reports on investigations of transportation conditions,
showing the movements of traffic by water, and treating of the physi-
cal and economic conditions having a bearing upon the utilization
of water routes. No new numbers were issued during the year. The
following numbers have been issued to date:
  No. 1. Transportation on the Great Lakes.
  No. 2. Transportation in the Mississippi and Ohio Valleys.
  Reports not within the scope of the Port Series, Lake Series, or
Transportation Series are published as the Miscellaneous Series.
Three reports have been issued in this series to date:
  No. 1.   Port and Terminal Charges at United States Ports, and one revision.
  No. 2.   Shipping Charges: at United States and Foreign Ports; Consular Serv-
ices and   Charges.
  No. 3.   Foreign Trade Zones: or Free Ports.
  A revision of Report No. 1 was prepared during the year and will
be distributed early in the new year. It is planned to revise this
report annually in order to have available current information. A
reprint of Report No. 3 was ordered.
  Miscellaneous studies were made in connection with subjects pend-
ing before the Board and in response to specific calls; and tables,
graphs, and maps have been prepared as necessary in connection
therewith.
  At the end of the fiscal year the Board was composed of the fol-
lowing members: Col. William J. Barden, Col. George M. Hoffman,
Col. Earl I. Brown, Col. James A. Woodruff, Lt. Col. Max C. Tyler,
Lt. Col. John C. H. Lee, and Maj. Milo P. Fox.
30       REPORT OF CHIEF OF ENGINEERS,          U.   S. ARMY,   1934


     The changes in membership were:
July 8, 1933. Col. William J. Barden assigned and ol. Earl I. Brown relieved.
August 3, 1933, Lt. Col. Eugene Reybold assigned for the period August 3 to
  September 15, 1933, during which Lt. Col. James J. Loving was relieved.
August 16, 1933. Maj. Milo P. Fox assigned.
October 20, 1933. Col. Earl I. Brown assigned and Maj. Gen. Edward M. Mark-
  ham relieved.
November 16, 1933, Lt. Col. James J. Loving relieved.
December 13, 1933. Col. George R. Spalding assigned and Col. Edward H.
  Schulz relieved.
February 27, 1934. Lt. Col. Max C. Tyler assigned and Col. Thomas II. Jackson
  relieved.
March 5, 1934. Col. James A. Woodruff assigned and Col. George R. Spalding
  relieved.
May 1, 1934. Lt. Col. John C. H. Lee assigned and Col. Warren T. Hannum
  relieved.
June 30, 1934. Col. George M. Hoffman retired.

IMPROVEMENT OF RIVERS AND HARBORS                                IN       THE
           BOSTON, MASS., DISTRICT

   This district includes the States of Maine and New Hampshire,
and eastern Massachusetts from the New Hampshire State line to
the southern end of Nauset Beach, at Chatham Bar, on the east coast
line of Cape Cod.
   District engineer: Lt. Col. Richard Park, Corps of Engineers,
to January 15, 1934; Lt. Col. John J. Kingman, Corps of Engineers,
since that date.
   Division Engineer: Col. George M. Hoffman, Corps of Engineers.
                                IMPROVEMENTS

                                 Page                                      Page
1.   Georges River, Maine ------ 30      8. Cape Cod Canal, Mass             48
2.   Portland Harbor, Maine----- 31      9. Operating and care of Cape
3.   York Harbor, Maine--------  34           Cod Canal, Mass ---- __-       54
4.   Gloucester Harbor, Mass...  35     10. Examinations, surveys, and
5.   Lynn Harbor, Mass_______--37             contingencies (general)__      56
6.   Boston Harbor, Mass ------  40     11. Other projects for which no
7.   Plymouth Harbor, Mass-----  46           estimates are submitted__      57

          1. GEORGES RIVER (THOMASTON HARBOR), MAINE

   Location.-This river is about 80 miles northeast of Portland and
about 4 miles west of Rockland, Maine. (See U. S. Coast and
Geodetic Survey Charts Nos. 312 and 1203.)
   Existing project.-This provides for a channel extending about 1
mile downstream from Thomaston, the depth to be 16 feet at mean
low tide, the width varying from 90 to 220 feet. The lower end of
the section included in the project is about 11 miles above the mouth
of the river. The mean range of tide is 9.3 feet, the extreme 10.6
feet. The estimated cost for new work, made in 1895, was $30,000.
The latest (1914) approved estimate for annual cost of maintenance
is $500.
   The existing project was authorized by the River and Harbor Act
of June 3, 1896 (H. Ex. Doc. No. 236, 53d Cong., 3d sess., reprinted
in annual Report for 1895, p. 590). For latest published map see
House Executive Document No. 1458, Sixty-third Congress, third
session.
                RIVERS AND HARBORS-BOSTON,                              MASS.,             DISTRICT                 31
   Terminal facilities.-There are only two wharves in usable condi-
tion, both private. The facilities, while limited, apparently meet
existing needs.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The project was completed in
1903 at a saving of $4,212 under the estimated cost. Project depth
was restored in 1919. A survey made in 1930 showed that while
shoaling had considerably narrowed the width of the channel, the
controlling depth was about 15 feeF at mean low water. The cost
and expenditures have been $41,000, of which $25,787.91 was for new
work and $15,212.09 for maintenance.
   Proposed operations.-The balance unexpended at the end of the
fiscal year amounting to $27,500, will be applied as follows:
Maintenance : Dredging between the mouth of the river and the upriver
end of Dunn & Elliot Coal Co. wharf, by contract (September-No-
vember 1934) about 50,000 cubic yards at an estimated cost of_ _-- $27, 500
  Upon completion of the maintenance dredging to be done during
the fiscal year 1935, the channel will be in satisfactory condition
to meet the needs of existing' commerce and, accordingly, no funds
can be profitably expended during the fiscal year 1936.
                                       Cost and financial summary

Cost of new work to June 30, 1934-----------------------------                                             $25, 787. 91
Cost of maintenance to June 30, 1934--------------                                                          15, 212. 09
         Total cost of permanent work to June 30, 1934 _.                                     ---           41, 000. 00

         Net total        expenditures-----------                                                           41, 000. 00
Unexpended balance June 30, 1934------------------------------                                              27, 500. 00
         Total amount appropriated to June 30, 1934-----------------_ 68, 500. 00

         Fiscal year ending June 30                   1930       1931               1932            1933        1934


Cost of new work       .--                                                     -
Cost of maintenance_-------

Total expended -- - --              - - --   -      - - -    -

Allotted----- ------ - -----            -_                                           _                -       $27, 500.00


Amount allotted from War Department Appropriation Act approved
   Apr. 26, 1934              _--       ________--_______                                                     $27, 500
Balance unexpended June 30, 1934                                     ------------                              27, 500

                                    2. PORTLAND HARBOR, MAINE

  Location.-This harbor is on the southwestern coast of Maine,
about 100 miles northeast of Boston, Mass. (See U. S. Coast and
Geodetic Survey Chart No. 325.)
  Previous projects.-Adopted by acts of July 4, 1836, June 23, 1866,
and June 10, 1872, and joint resolution of June 5, 1868. The cost
and expenditures were $692,435.25, all for new work. For further
details see page 1736 of Annual Report for 1915.
         91536-ENG 1934-               3
32     REPORT   OF   CHIEF OF ENGINEERS,    U.   S.   ARMY,   1934


   Existing project.-This provides for a commodious anchorage off
the eastern end of the city, with a minimum depth of 30 feet; for
dredging the greater part of the inner harbor to a depth of 30 feet,
except for the lower part of the main harbor and its channel of
approach, where the depth is to be 35 feet; for a channel 30 feet
deep and 300 feet wide in Fore River up to the upper Boston &
Maine Railroad bridge; for a channel 30 feet deep and 300 feet wide
from the anchorage to the Grand Trunk bridge at the mouth of Back
Cove; for rock excavation to give a depth of 14 feet between the
Grand Trunk and Tukeys bridges, and a channel 12 feet deep and
300 feet wide thence to the head of Back Cove; for the removal of
two obstructing ledges in the main ship channel to a depth of 40
feet; and for a stone breakwater about 1,900 feet long on the south-
erly side of the mouth of the inner harbor.
   The project depths refer to mean low water. The mean tidal
range is 8.9 feet, extreme 10.2 feet, though variations as great as 16
feet have been observed under storm conditions.
   The estimate of cost for new work, revised in 1928, is $1,790,000,
exclusive of amounts expended on previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $20,000.
   The existing project was authorized by the following acts: The
River and Harbor Act of July 4, 1836, provided for the breakwater
 (H. Doc. No. 491, 23d Cong., 1st sess.) ; the River and Harbor Act of
June 3, 1896, provided for 30 feet over the greater part of the inner
harbor (S. Doc. No. 271, 54th Cong., 1st sess.) ; the Sundry Civil
Act of March 3, 1905, provided for extensions of the 30-foot depth
up Fore River and in the channel of approach to Back Cove; the
River and Harbor Act of July 25, 1912, provided for the anchor-
age, for 14 feet at the entrance to Back Cove, for restoring the 12-
foot depth in Back Cove, and the 30-foot depth in the approach as
well as in the lower part of the inner harbor (H. Doc. No. 489, 62d
Cong., 2d sess.); and the River and Harbor Act of August 8, 1917,
provided for 35 feet at mean low fide in the lower part of the main
harbor and the channel of approach and for the removal of two
obstructing ledges in the main channel (H. Doc. No. 71, 65th Cong.,
1st sess.). For latest published map see last-mentioned document.
   Local cooperation.-The River and Harbor Act of August 8, 1917,
required that assurances be given that adequate berthing space for
deep-draft vessels, affording a depth of not less than 35 feet at low
water for spring tides would be provided by local interests within a
reasonable time. These assurances were given and approved by the
Secretary of War August 27, 1917. Since that date the work covered
by these assurances has practically been accomplished.
   Terminal facilities.-The harbor has a water front of about 81/
miles, rather more than one-half of which has been developed. There
are 55 wharves, all but 15 of which are in the city of Portland, two
publicly owned ferry landings, and a large modern pier owned by
the State.
   The terminal facilities are considered adequate for existing com-
merce.     (For further details see Port Series No. 1, Corps of
Engineers.)
    Operations and results during fiscal year.-Maintenance dredging,
under contract, for restoring project depths in the 30-foot anchorage,
          RIVERS AND     ITARBORS--BOSTON,     MASS., DISTRICT               33
the 30- and 35-foot channels in the lower harbor, the 30-foot channel
in the inner harbor and Fore River, was commenced June 11, 1934, in
the 30-foot channel of the inner harbor, and was in progress at the
close of the fiscal year. During the period, 49,631 net cubic yards,
scow measurement, of material was removed, at a cost of $19,736.33.
The expenditures were $12,647.03.
    Condition at end of fiscal year.-The existing project is completed
except for removal of two obstructing ledges in the main ship chan-
nel to a depth of 40 feet at mean low water. About 88 percent of
the entire project has been accomplished. The condition of the
project as ascertained in 1931 and 1934 was as follows: In the 30-
foot anchorage area the controlling depth, with the exception of an
area about 100 feet wide and 800 feet long in the southeasterly
corner over which there was a controlling depth of 21 feet, was
about 27 feet at mean low water in 1934. In the 30-foot channel of
approach to Back Cove the controlling depth was about 20 feet in
1931, due apparently to deposits from the Presumpscot River. As
this part of the channel is no longer used for deep-draft traffic no
inconvenience is experienced. The controlling depth between Grand
Trunk and Tukeys bridges was 14 feet at mean low water in 1931.
In the 35-fQot channel in the lower harbor the controlling depth in
1934, with the exception of the southeasterly half of the channel
abreast of the Grand Trunk Wharves over which there was, a con-
trolling depth of 28.3 feet, was 32 feet at mean low water. In 1934
the controlling depth in the 30-foot channel in the lower harbor was
29 feet at mean low water. In the 30-foot channel between the inner
end of the 35-foot channel and Portland Bridge across Fore River
the controlling depth in 1934 was 27 feet at mean low water. In
Fore River the controlling depth in 1934, with the exception of a
small area near the upper end of the Portland Terminal Co. Wharf
No. 3, over which there was a controlling depth of 27.5 feet, was 28.0
feet. In Back Cove the controlling depth in June 1932 was 12 feet
at mean low water.
    The costs have been $1,578,129.06 for new work and $214,027.24
for maintenance, a total of $1,792,156.30. The total expenditures
have been $1,785,067.
    Proposed operatiouns.-The balance unexpended at the end of the
fiscal year amounting to $267,342.19, will be applied as follows:
Accounts payable June 30, 1934_____________       __                  $7, 089.30
Maintenance: Complete by May 15, 1935, under a contract in force
by dredging as follows:
   35-foot channel in lower harbor -----.            $41, 217. 52
    30-foot channel in main harbor and Fore River -- 119, 069. 97
   30-foot anchorage-------------------------------99, 965. 40
                                                                    260,252.

      Total------------------------------------------------         267, 342f.
   The only part of the existing project remaining uncompleted is
the removal of two ledges in the main ship channel, estimated to
cost about $200,000. This involves the removal of about 3,200 cubic
yards of rock to the depth of 40 feet at mean low water. So far as
known there is no urgent necessity for the removal of these rock
ledges at this time.
34            REPORT OF CHIEF OF ENGINEERS,                                U. S. ARMY,                 1934

  No additional funds can be profitably expended during the fiscal
year 1936 as the completion of the above dredging will leave the
channels in good condition to meet the requirements of commerce.

                                           Cost and financial summary

'Costof new work to June 30, 1934                               270, 564. 31
                                                              $--------------------
Cost of maintenance to June 30, 1934-------------------------   214, 027. 24

     Total cost of permanent work to June 30, 1934             2, 484, 591. 55  -----------
Minus accounts payable June 30, 1934 -------------------------      7, 089. 30

     Net total expenditures--------------------------------2, 477, 502. 25
Unexpended balance June 30, 1934------ --------------------   267, 342. 19

            Total amount appropriated to June 30, 1934                                -2,                   744, 844. 44


            Fiscal year ending June 30               1930           1931            1932             1933          1934


Cost of new work--------------------  -------------                                            -
Cost of maintenance------------------            $13, 420. 48    $24, 492.91    $58, 882. 28       $4, 020. 44   $19, 736. 33
Total expended-------------------                  12, 744. 32    17, 485. 48    58, 974. 41        4,230. 75     12, 647. 03
Allotted-------- -----------------------           51, 700. 00   -9, 700. 00     45, 000. 00   -5, 890. 58       279, 989. 22



Amount allotted from War Department Appropriation Act approved
July 14, 1932__---------------------------------------------- $40, 000. 00
Amount allotted' from War Department Appropriation Act approved
Mar. 4, 1933--------------------------------------------- 240, 000.00
     Amount' to be accounted for-----------------------------280, 000.00
Deductions on account of revocation of allotment ----------------  10. 78

      Net amount to be accounted for__                         279, 989.22
Gross amount expended ---------------------------------------- 12, 647. 03
      Balance unexpended June 30, 1934------------------------ 267, 342. 19
Outstanding liabilities June 30, 1934_ _.... ._           $2. 25
Amount covered by uncompleted contracts------------ 264, 844. 94
                                                                                                       -     264, 847. 19

      Balance available June 30, 1934_....                   __--_   2, 495. 00
Amount (estimated) required to be appropriated for completion of
existing project _________________
                                -       __  -   ____               212, 000. 00

                                           3. YORK HARBOR, MAINE

        Location.-This harbor is the mouth of York River, a small stream
emptying into the Atlantic Ocean, about 10 miles east of Portsmouth,
N. H., and 40 miles south of Portland, Maine. (See U. S. Coast and
Geodetic Survey Chart No. 228.)
  Previous projects.--Adopted by the act of August 5, 1886. The
cost and expenditures were $44,000, all for new work. For further
details see page 40 of Annual Report for 1907.
  Existing project.-This provides for widening the channel off
Bragdons Island about 170 feet by dredging to the depth of 10 feet
at meari low water and for removing to the same depth the point
of projecting shoal just above. The mean tidal range is 8 feet.
        1Exclusive   of available funds.
                 RIVERS AND HARBORS-BOSTON,                               MASS.,      DISTRICT                    35
   The estimate of cost for new work, made in 1905, exclusive of
amount expended on previous project, was $13,400. The existing
project was adopted by the River and Harbor Act of March 3, 1905.
The latest published map is in House Document No. 301, Fifty-
eighth Congress, second session.
   Terminal facilities.-None. The harbor is used mostly by fishing
boats and pleasure craft.
   Operations and results during fiscal year.--None.
   Condition at end of fiscal year.--The existing project was com-
pleted in 1906. The controlling depth at mean low water in the area
covered by the existing project was 7.4 feet in 1930. The cost and
expenditures have been $13,400, all for new work.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $11,000, will be applied to maintenance
dredging in the harbor basin west of Stage Neck by contract, Sep-
tember to November 1934.
   Upon completion of the maintenance dredging to be done during
the fiscal year 1935, the channel will be in satisfactory condition to
meet the needs of existing commerce and, accordingly, no funds can
be profitably expended during the fiscal year 1936.
                                       Cost and financial summnary

Cost of new work to June 30, 1934                                            --------                    $57, 400
Cost of maintenance to June 30, 1934_-                                                                        -

          Total cost of permanent work to June 30, 1934-                                ---               57, 400

         Net total expenditures                        --                                                 57, 400
Unexpended balance June 30, 1934_                                     ---       -             -           11, 000

          Total amount appropriated                 to June 30, 1934                      __              68, 400

         Fiscal year ending June 30                 1930           1931        1932               1933     1934


Cost of new work-----------------
Cost of maintenance         -   -       ---      ---------
Total expended-_______-__

Allotted..--------------                            _-_-__
                                              ----------     ---                 -                       $11, 000. 00


Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934 _               ------------------------------------ $11, 000
Balance unexpended June 30, 1934--- ------------------------------ 11, 000

                                    4. GLOUCESTER HARBOR, MASS.

  Location.-The harbor is situated at the southern extremity of
Cape Ann, about 23 miles northeast by water from Boston Harbor.
(See U. S. Coast and Geodetic Survey Chart No. 243.)
  Previous projects.-Adopted by River and Harbor Acts of June
10, 1872, August 5, 1886, and June 3, 1896. The cost and expendi-
tures on projects prior to the adoption of the existing project were
$21,000, all for new work. For further details see page 1740 of
Annual Report for 1915.
36        REPORT   OF CHIEF    OF ENGINEERS,       U.   S.   ARMY,   1934

  Existing project.-This provides:
  (a)   For a rubblestone breakwater, 2,250 feet long, surmounted by a super-
structure of dry walls of heavy split stone enclosing a core of rubblestone from
Eastern Point over Dog Bar to Cat Ledge.
   (b) For the removal of three ledges in the inner harbor, one to 12 feet and
two to 15 feet depth at mean low water, and five ledges in the outer harbor,
four to 18 feet, and one to 25 feet depth at mean low water, aggregating a total
of 2,206 cubic yards, place measurement.
   (c) For removal to depth of 15 feet below mean low water of ledges and
boulders obstructing the approach to the wharves between Harbor Cove and
Pews Wharf, near the head of the inner harbor; dredging to the same depth
of the channel leading past the wharves and dredging of Harbor Cove to the
depth of 10 feet at mean low water.
     The mean range of tide is 8.9 feet.    The extreme range is 12.6 feet.
  The estimates of cost for new work, exclusive of amounts expended
on previous projects, were as follows:
   (a) For breakwater, $416,083.43, revised in 1902; (b) removal of eight ledges,
$51,000, made in 1908; (c) for removal of ledges and boulders and dredging,
$65,000, made in 1887.
  The latest (1928) approved estimate for annual cost of mainte-
nance of the breakwater is $1,000.
  The existing project was authorized by the following river and
harbor acts:
   (a) The act of August 18, 1894, provided for the breakweater from Eastern
Point to Round Rock Shoal (H. Ex. Doc. No. 56, 48th Cong., 2d ress.) ; and the
act of June 13, 1902, authorized the termination of the breakwater at Cat
Ledge; (b) the act of June 25, 1910, provided for the removal of eight, ledges
(H. Doc. No. 1112, 60th Cong., 2d ses.s.) ; (c) the act of August 11, 1888, pro-
vided for the removal of ledges and boulders, and dredging (Annual Report for
1887, p. 503).
   References to latest published maps: Project of 1888 for removal
of ledges and boulders and dredging, Annual Report for 1887, pages
504 and 506; project of 1894 for breakwater, and project of 1910 for
ledge removal (H. Doc. No. 1112, 60th Cong., 2d sess.). The latest
published map of Gloucester Inner Harbor is in Rivers and Harbors
Committee Document No. 39, Seventy-second Congress, first session.
   Terminal facilities.-There are in Gloucester Harbor 60 wharves
worthy of mention. The depth beside the wharves varies from 0 to
18 feet at mean low water. Except for two wharves owned by the
city, all are private, and are not available to the public.
   These facilities are considered adequate for the commerce of the
port.
   Operations and results during fiscal year.-Under a contract for
the repair of the Dog Bar Breakwater, work was commenced on
December 5, 1933, and was completed on March 29, 1934. One
hundred and ten linear feet of superstructure was repaired and the
heavy rubblestone apron on the seaward side was repaired where
necessary for a total length of about 1.100 feet at a total cost and
expenditure of $6,864.02 for maintenance.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1916 at a saving of $30,905 under the estimated cost. The
removal of all ledges and boulders between Harbor Cove and Pew's
Wharf, and other obstructing rocks, was completed in 1896; the
dredging of a channel in front of the wharves and in Harbor Cove
was completed in 1894, and the removal of a pinnacle rock in the
                RIVERS       AND HARBORS-BOSTON,                                MASS.,          DISTRICT                            37
outer harbor in 1896, all at a cost of $66,681.65. The breakwater
completed in 1905 was built at a cost of $410,097.19 for new work
and $30,260.81 for maintenance, a total of $440,358.          The re-
moval of all ledges was completed in 1916 at a cost of $24,400 for
new work. The controlling depths over the ledges in the outer harbor
as ascertained in 1916 are from 18 to 25 feet, the controlling depth
as ascertained in 1931 over the ledges in the inner harbor was 14.6
feet. The costs and expenditures have been $501,178.84 for new
work and $30,260.81 for maintenance, a total of $531,439.65
   Proposed operations.--No work is proposed during the fiscal years
of 1935 and 1936.
                                       Cost and financial summary

Cost of new work to June 30, 1934-__ ______-                                                _                     $522, 178. 84
Cost of maintenance to June 30, 1934_ _-                                                                            30, 260. 81

      Total cost of permanent work to June 30, 1934 ------------ 552, 439. 65
Net total expenditures -------------------------------------- 552, 439. 65
      Total amount appropriated to June 30, 1934--------- ----- 552, 439. 65

         Fiscal year ending June 30                        1930          1931            1932              1933              1934


Cost of new work----------                          ------------                    ------------                      ---
Cost of maintenance---       ---       -----              --
                                                         --               $11. 00     $7, 381. 63 -         ---             $6, 864. 02

Total expended-----------------------                      -               11. 00      7, 381. 63 ------------               6, 864. 02
Allotted .....-------------------------        -     ----------     10, 000. 00               -     -$2,    607. 37          6, 864. 02


Amount allotted from War Department Appropriation Act approved
Feb. 28, 1929-_                     ____  _                   $3,354. 42
Amount allotted from War Department Appropriation Act approved
   May 28, 1930__________________                                                                                     2,738.12
Amount allotted from War Department Appropriation Act approved
   Feb. 23, 1931__                 _               -__________________                                                1,307.46

      Amount to be accounted for_    ____  _________
                                             --                                                 _      _              7, 400. 00
Deductions on account of revocation of allotment_                               ---------             ------                535. 98

         Net amount to be accounted for__ ___________---                                                              -6, 864. 02
'Gross amount expended__ ______________-__--_________-                                                                 6, 864.02

                                       5. LYNN HARBOR, MASS.

   Location.-This harbor, formed by a natural indentation of the
coast line, is distant about 14 miles by water in a northeasterly direc-
tion from Boston. (See U. S. Coast and Geodetic Survey Chart
No. 240.)
   Previous projects.-Adopted by acts of August 2, 1882, July 13,
1892, June 13, 1902, and June 25, 1910. The costs and expenditures
prior to the adoption of the existing project in 1930 were $471,937,
of which $412,229.14 was for new work and $59,707.86 for mainte-
nance. (For further details see Annual Report for 1929, p. 51.)
   Existing project.-This provides for a channel 22 feet deep at
mean low water and 300 feet wide from deep water west of Bass
Point, Nahant, to a turning basin 550 feet wide at the head of the
harbor, and to straighten the curve in the approach to the turning
38     REPORT OF CHIEF OF ENGINEERS,        U.   S.   ARMY,   1934


basin. The mean range of tide is 9.2 feet, the extreme range is 13.3
feet.
   The estimate of cost for new work revised in 1931 is $320,000,
exclusive of amounts expended on previous projects. The latest
 (1929) approved estimate for annual cost of maintenance is $6,000.
   The existing project was adopted by the River and Harbor Act of
July 3, 1930, which limits the expenditure on the existing project to
$615,500. (Rivers and Harbors Committee Doc. No. 7, 71st Cong.,
1st sess.) The latest published map is in the above-mentioned docu-
ment.
   Recommended modifications of project.-In Rivers and Harbors
Committee Document No. 7, Seventy-first Congress, first session, it
was recommended that the channel be dredged to a depth of 25 feet
at a cost of $912,000. Dredging to a depth of 22 feet was authorized
in the 1930 River and Harbor Act.
   Local cooperation.-Fully complied with.
   Terminal facilities.-The terminal facilities consist of 7,500 feet
of wharf frontage. On the west shore of the harbor is a large pri-
vate coal and supply wharf of about 1,500 feet frontage, 800 feet of
which has a depth of 26 feet at mean low water and is approached by
a branch channel from the main ship channel, dredged to 22 feet at
mean low water.
   On the north shore of the harbor are two wharves owned by the
city of Lynn, one of 555-foot frontage, and one of 115-foot frontage,
both in poor condition.
   Westerly and adjacent to the property of the Lynn Gas & Electric
Co. the city of Lyrmn has constructed a bulkhead with a length of
about 4,450 feet and the above-mentioned branch channel has been
extended along a portion of the face of this bulkhead as required
by the act of July 3, 1930. A filled area of about 137 acres behind
this bulkhead affords an opportunity for development of wharves
and storage sheds.
   On the Saugus River, about 1.5 miles above the mouth of the river,
is a wharf with about 516-foot frontage on the north bank of the
river. At a point about 1,500 feet farther up the river, on the north
bank, is a wharf with about 175-foot frontage; and on the north
bank, in the town of Saugus, is a large wharf having a frontage of
about 500 feet.
   All the wharves in Lynn Harbor and Saugus River except the city
wharves are privately owned and are not open to general public
use. These facilities are considered adequate for existing commerce.
   Operations and results during fiscal year.-Improvement dredging,
under contract, was resumed April 23, and completed June 30, 1934.
During the period dredging and dragging operations were in prog-
ress over a length of about 6,200 feet of the channel at its outer end,
and it is estimated that 48,300 cubic yards, scow measurement, of
ordinary material and 6.22 cubic yards of boulders were removed.
The yardage removed is subject to correction upon completion of
final survey. Project depth was secured except where ledge was
encountered at a point about 100 feet harborward of a point abreast
of the outer channel dolphin. The costs were $9,524.45, all for new
work. The expenditures were $9,162.04.
                RIVERS AND HARBORS-BOSTON,                             MASS., DISTRICT                                39
   Condition at end o fiscal year.-The existing project, with the
exception of the removal of the small ledge area encountered in
dredging operations near the close of the fiscal year, is completed.
The ledge area restricts the channel width on the easterly side to
about 160 feet and on the westerly side to about 60 feet. The control-
ling' depth in the channel easterly and westerly of the ledge area is
22 feet. The controlling depth over the ledge is about 16.4 feet at
mean low water. The costs under the existing project have been
$330,025.04, and the expenditures have been $319,242.29, all for new
work.
   Proposed operations.-The balance unexpended at the end of the
fiscal year amounting to $15,361.65 will be applied as follows:
                         ,
Accounts payable             June, 30, 1934 _______________-------
                                                               ------                                 $10, 782.75
New work: Complete by Aug. 15, 1934, all work in connection with
  contract dredging under project authorized by the 1930 River and
  Harbor Act------------               -------------------------                                            4, 578. 90

         Total_________                                                                                    15, 361. 65
  It is not believed that any maintenance operations will be required
during the fiscal year ending June 30, 1936.
                                     Cost and financial sunm/mary

Cost of new work to June 30, 1934----------------------------                                         $742, 254. 18
Cost of maintenance to June 30, 1934----------------------------                                        59, 707. 86
     Total cost of permanent work to June 30, 1934-------------- 801, 962. 04
Minus accounts payable June 30, 1934----------------------------  10, 782. 75
     Net total expenditures ----------------------------------  791, 179. 29
Unexpended balance June 30, 1934-------------------------------15, 361. 65
         Total amount appropriated to June 30, 1934----------------                                       806, 540. 94

         Fiscal year ending June 30                  1930       1931             1932          1933            1934


Cost of new work ..   . __---------
                                _...                            $880. 27 $158, 025.95 $161, 594. 37           $9, 524. 45
Cost of maintenance------------------------                                                                    -

Total expended --------------             --     -      -        880. 27   112, 190. 64     197, 009. 34       9, 162. 04
Allotted-------------------------------                      240, 000. 00 -65, 000. 00      143, 838. 89      15, 765. 05


Balance unexpended July 1, 1933-____                                                                       $8, 758.64
Amount allotted from War Department Appropriation Act approved
   July 14, 1932----------------------                                                                     15, 900. 00

     Amount to be accounted for                                                                     __     24, 658. 64
Deductions on account of revocation of allotment                                                               134. 95
         Net amount to be accounted for                     -------------------------                      24, 523. 69
Gross amount expended_                     ___                                                              9, 162. 04

      Balance unexpended June 30, 1934----__                                                         15,361.05
Outstanding liabilities June 30, 1934 -_                                                    $558. 79
Amount covered by uncompleted contracts                                      _           14, 365. 12
                                                                                        e----------- 14, 923. 91

         Balance available June 30, 1934__                                    __________              _       437. 74
40     REPORT   OF CHIEF OF    ENGINEERS, U.   S. ARMY,   1934

                     6. BOSTON HARBOR, MASS.

   Location.-This harbor includes all the expanse of tidewater lying
within a line from Point Allerton to Point Shirley and extending
from that line westward to the mainland. This comprises an area
of about 47 square miles, exclusive of the islands. (See U. S. Coast
and Geodetic Survey Chart No. 246.)
   Previous projects.-Adopted by the River and Harbor Acts of
March 2, 1867, June 14, 1880, and September 19, 1890. The total
cost and expenditures were $1,355,698.93 for new work, of which
$139,064.51 was applied to the Nantasket Beach and Jeffries Point
Channels and Charles River, and the balance, $1,216,634.42, to
the 23-foot channel. For further details see page 1743 of Annual
Report for 1915.
    Existing project.-This provides for a channel 40 feet deep in
general, but 45 feet deep through rock, from the sea to President
Roads through Broad Sound, 2 miles, 900 feet wide except at the
outer end where it is widened to 1,100 feet; a channel 35 feet deep
from the sea (along the same line as the 40-foot channel) through
Broad Sound to the navy yard at Charlestown and the Chelsea
North, Meridian Street, and Charles River Bridges, 1,500 feet wide
from the sea to President Roads, 1.5 miles, and thence 1,200 feet
wide for the remaining distance of 6 miles; a channel 2 miles long,
30 feet deep, and 1,200 feet wide from the sea to President Roads
through Broad Sound by a less direct route than the 35- and 40-foot
channels; a channel 27 feet deep and 1,000 feet wide from Nantasket
Roads to President Roads, 3 miles; a channel 15 feet deep, 300 feet
wide, and 550 feet long through the bar which extends from the
north head of Long, Island to Nixes Mate Shoal, known as Nixes
Mate or Nubble Channel; a channel in Chelsea Creek 25 feet deep
and 150 feet wide, from the Meridian Street Bridge, at the head of
the 35-foot channel in Boston Harbor, to the old East Boston (Chel-
sea Street) Bridge, a distance of about seven-eighths of a mile, and
a channel about 1 mile in length next below the head of navigation,
8.4 feet deep and 150 feet wide, the lower end of this channel being
about 2 miles above the mouth of the river; the Fort Point Channel,
23 feet deep and 175 feet wide from its entrance, in Boston Harbor,
about four-fifths of a. mile to near the Dorchester Avenue (old Fed-
eral Street) Bridge; and sea walls of coursed stone and riprap
protecting the most exposed headlands and islands. All depths are
referred to mean low water.
    The mean range of tide is 9 feet at Boston Light and 9.6 feet in
the upper harbor, in Chelsea Creek, and in Fort Point Channel.
  The extreme range is about 4 feet greater.
    The estimate of cost for new work, revised in 1928, exclusive of
  amount expended on previous projects and of sea walls for which
  no estimate was given, was $10,925,000. The latest (1928) approved
  estimate for annual cost of maintenance is $81,000.
    The existing project was authorized by the following river and
  harbor acts: The act of March 2, 1825, provided for the preservation
  of the islands by sea walls; the act of August 5, 1886, provided for
  Fort Point Channel (H. Ex. Doc. No. 206, 48th Cong., 2d sess.);
  the act of July 13, 1892, provided for the 27-foot channel (see p. 766
  of Annual Report for 1893); the act of June 3, 1896, provided for
          RIVERS AND HARBORS--BOSTON,       MASS., DISTRICT         41.
the channel in upper Chelsea Creek (H. Ex. Doc. No. 162, 53d Cong.,
3d sess.) ; the act of June 13, 1902, provided for the 35-foot channel
 (H. Doc. No. 119, 56th Cong., 2d sess.), the estimate differing from
any in that document, owing to the different: widths of the channels
adopted; and the omission from the project of the removal of Finns
Ledge, at the outer entrance, was authorized by the Chief of Engi-
neers March 11, 1913; the act of July 25, 1912, provided for the
channel in lower Chelsea Creek (H. I)oc. No. 272, 62d Cong., 2d
sess.) ; the act of August 8, 1917, provided for the 40-foot channel
  (H. Doc. No. 931, 63d Cong., 2d sess.).
   References to latest published maps: President Roads to Bridges,
House Document No. 244, Seventy-second Congress, first session; sea
walls and Nixes Mate Channel, page 1178 of Annual Report for 1911;
27, 30, 35, and 40 foot channels, House Document No. 931, Sixty-
third Congress, second session; upper Chelsea Creek, House Execu-
tive Document No. 162, Fifty-third Congress, second session; lower
Chelsea Creek, House Document No. 272, Sixty-second Congress,
second session; Fort Point Channel, location shown on map facing
page 770 of the Annual Report for 1903.
   Supplementing the work authorized by Congress the dredging
of an anchorage area 40 feet deep, 2,000 feet wide, and 5,500 feet
long on the north side of President Roads, as recommended by the
Chief of Engineers in House Document No. 244, Seventy-second
Congress, first session, has been included in the public-works pro-
gram under the National Industrial Recovery Act.
   Recommnended modifications of project.-Under date of February
6, 1932, the Chief of Engineers recommended modification of the
existing project so as to provide for deepening the main ship channel
from President Roads to Commonwealth Pier No. 1, East Boston,
to 40 feet for a width of 600 feet with suitable widening at the bend
in the channel, and for dredging to afford an anchorage area 40 feet:
deep. 2,000 feet wide, and 5,500 feet long on the north side of Presi -
dent Roads, at a total estimated cost of $4,800,000, with maintenance
at the rate of $30,000 annually, subject to certain conditions of local
cooperation (H. Doc. No. 244, 72d Cong., 1st sess.). Dredging of
anchorage area authorized under Public Works program.
   Terminal facilities.-The wharf development of Boston Harbor
lies westerly of Governors and Castle Islands. Bordering on the
35-foot channel and below all bridges there is about 4 miles of water
front, fully developed with wharves of various types devoted to com-
mercial purposes; and on the Charlestown shore is located the
United States navy yard, with a frontage of about five-eighths of a
mile.
   Easterly of the wharf development on the East B ston front the
Commonwealth of Massachusetts contemplates the development of
an extensive area of shore frontage which will ultimately include a
system of large modern piers, extensive manufacturing and storage
areas, and complete railroad connections. Only a portion of the
bulkheading and filling has been done on this development to date.
The Boston Airport has been established on the westerly portion of
the filled area.
   There are numerous public and private wharves, piers, ferry slips,
and dry docks; for description, see pages 56 to 59 of the Annual
Report for 1932. and Port Series No. 2, Corps of Engineers.
42     REPORT   OF CHIEF   OF ENGINEERS,    U.   S. ARMY,   1934


            OPERATIONS   AND RESULTS   DURING FISCAL YEAR


  Project adopted by Congress.-Maintenance work, under contract,
for repairs to Lovells Island sea wall in progress at the beginning of
the fiscal year was completed August 24, 1933. The costs were
$6,210.06 for maintenance.
   Maintenance work, under contract, for repairs to sea wall at Point
Allerton was commenced November 7, 1933; and was completed
February 1, 1934. The costs were $6,221.16 for maintenance.
   Maintenance work, under contract, for repairs to sea walls at Deer
Island was commenced January 19, and was completed June 19, 1934.
The costs were $7,904.65 for maintenance.
   Maintenance dredging, under contract, in the 35-foot channel inner
harbor, under Emergency Relief and Construction Act of 1932, in
progress at the beginning of the fiscal year was completed January
9, 1934. Shoal areas in a section of the channel extending from
Castle Island, South Boston, to the bridges at the head of the harbor
were removed to a depth of 35 feet at mean low water. During the
period there were removed 387,737 net cubic yards, scow measure-
ment, of material at a cost of $82,873.65 for maintenance.
   Additional maintenance operations included field examinations of
the various channels, supervision of the harbor, investigation of
complaints, and the general administration in the interests of naviga-
tion of'this extensive harbor and its channels of approach, at a cost
of $452.57 for maintenance.
   The total cost from regular funds was $103,662.09, all for main-
tenance. Expenditures were $124,875.88.
   Project authorized by Federal Emergency Administration of
Public Works.-Improvement work, under Public Works contract,
for dredging section "A" the westerly portion of the 40-foot anchor-
age was commenced October 30, 1933, and was in progress at the
close of the fiscal year. During the period 701,686 net cubic yards,
scow measurement, of ordinary material and 4.99 cubic yards of
boulders were removed. The costs were $288,451.59 for new work.
  Improvement work, under Public Works contract, for dredging
section " B " the easterly portion of the 40-foot anchorage was
commenced December 1, 1933, and was in progress at the close of
the fiscal year. During the period 950,112 net cubic yards, scow
measurement, of material were removed. The costs were $299,868.66
for new work. The total costs under Public Works funds were
$588,320.25 all for new work. Expenditures were $512,958.56.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1930. Under the existing project sea walls of a total
length of about 3.75 miles have been built and are being maintained
on Great Brewster, Lovells, Gallops, Long, Rainsford, Deer, and
Georges Islands, and on Point Allerton. Some of the walls are in
need of repairs. The costs of the sea walls amount to $1,377,369.69,
of which $1,263,022.85 was for new work and $114,346.84 for main-
tenance. The Nixes Mate or Nubble Channel was completed in
1892, the 30-foot channel in 1905, the 27-foot channel in 1907, the
upper channel in Chelsea Creek in 1907, Fort Point channel in 1909,
          RZVERS    ANT)D HARBORS-BOSTON,         1ASS.,   DISTRICT             43
the 35-foot channel in 1915, the lower channel in Chelsea Creek in
1916, and the Broad Sound 40-foot channel in 1930. The total costs
of these channels have been $9,118,264.59 for new work and $904,-
910.18 for maintenance, or $10,023,174.77 in all.
   Cost of the Broad Sound 40-foot channel has been $568,367.62 for
new work.
   The controlling depth in the 35-foot channel, as ascertained in 1934
was 35 feet at mean low water.
   The controlling depth of Fort Point Channel, as ascertained in
1930, was 21.5 feet at mean low water; of upper Chelsea Creek in
1930, 8 feet; lower Chelsea Creek in 1930, 23.5 feet; and of Nixes
Mate Channel in 1930, 15 feet.
   The total costs have been $12,333,058.01, of which $10,949,655.06
was for new work, and $1,383,402.95 for maintenance.                    The total
expenditures have been $12,363,908.52.
  The dredging of an anchorage area 40 feet deep, 2,000 feet wide,
and 5,500 feet long on the north side of President Roads, authorized
by the Public Works Administration, is about 57 percent completed.
  The total costs under the Public Works program have been
$588,320.25, all for new work. The total expenditures were
$512,958.56.
  Proposed operations.-The balance unexpended,                 including ac-
counts receivable, at the end of the fiscal year, together with an
allotment of $260,000 made during 1934 from Public Works Admin-
istration funds, a total of $580,106.22, of which $33,064.78 pertains
to regular funds and $547,041.44 to Public Works Administration
funds, will be applied as follows:
Regular funds:
   Accounts payable June 30, 1934----------------------------$4, 181. 57
   Maintenance: Repairing sea walls at Long Island,
      Great Brewster Island, Georges Island, and Rains-
      ford Island by contract (September 1934-June
      1935) -------------------------------------       $27, 500. 00
    Miscellaneous   surveys of project channels -_____     1, 383. 21
                                                                         28, 883. 21

      Total -__------------------------------------                      33, 064. 78

Public Works Administration funds:
    Accounts payable June 30, 1934-----------------------___        75, 361. 69
    New work:
        C(ompletion of dredging section B of 40-foot anchorage
          by a contract now in force--------------------------     231, 765. 60
        Completion of dredging section A of 40-foot anchorage
          except about 200,000 cubic yards in northwest corner, by
          a contract now in force-----------------------------     239, 914. 15

          Total----------------------------------------------           547, 041.44
  The sum of $80,000 can be profitably expended during the fiscal
year 1936, to be applied to completion of dredging section A of
the 40-foot anchorage to full project dimensions by contract (July-
October 1935).
44         REPORT OF CHIEF               OF ENGINEERS, U. S. ARMY, 1934

                                 Cost and finaowial summary
                          MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934____________                              -          -______ $12, 305, 353. 99
Cost of maintenance to June 30, 1934_________
                                      ---------                                                 1, 383, 402. 95

      Total cost of permanent work to June 30, 1934 __.______                                        13, 688, 756. 94
Value of plant, materials, etc., on hand June 30, 1934_________                                           30, 019. 93

      Net total cost to June 30, 1934 _________------13,                                                  718, 776. 87
Plus accounts receivable June 30, 1934 .-------------------                                                 5, 012. 15

      Gross total costs to June 30, 1934_                                _____-----
                                                                             -__.                    13, 723, 789. 02
Minus accounts payable June 30, 1934_ ---                                  ___----4,                          181. 57

      Net total expenditures__---__----------                                --------                13, 719, 607. 45
Unexpended balance June 30, 1934_ ....   __                              __--____     _-         -        28, 052. 63

         Total amount appropriated to June 30, 1934___________                                       13, 747, 660. 08

        Fiscal year ending June 30             1930          1931                1932            1933              1934


Cost of new work______________               $30, 410. 80 $22,156. 30 ____________....................
Cost of maintenance__                        16, 994. 90    8,338. 29                          052.97 $103, 662. 09
                                                                               $2, 841. 78 $117,
      Total cost_                            47, 405. 70   30, 494. 59          2, 841. 78   117, 052. 97        103, 662. 09
Total expended_________   ________________   49,776. 90    37, 684. 90          9, 212. 51   '104, 776.02        124, 87.'88

Allotted_ _______________ ________________   55, 000. 00   32, 500. 00     -237,                     902. 52    -17, 605. 02



Balance unexpended July 1, 1933 _______________________                                        _____$170, 533. 53
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934________________________ $26, 000.00
Amount allotted from War Department Appropriation
Act approved July 14, 1932                           8, 500. 00
Amount allotted from War Department Appropriation
Act approved Feb. 23, 1931______________________     8, 500.00
                                                                                                               43, 000. 00

     Amount to be accounted for______________________________                                             213, 533. 53
Deductions on account of revocation of allotment                                                           60, 605. 02
      Net amount to be accounted for ____________________       _ 152, 928. 51
Gross amount expended_________________________ 197, 343. 90
Less:
    Reimbursements collected _______    _ $72, 158.82
    Receipts from sales __   __- -     -____ 309. 20
                                                      72, 468. 02
                                                                  124, 875. 88
       Balance unexpended June 30, 1934______________________                                                  28, 052. 63
Outstanding liabilities June 30, 1934________________  5,672. 93
Amount covered by uncompleted contracts______ ___-__      58. 45
                                                                                                                5, 731. 38
       Balance available June 30, 1934________________________                                                 22, 321.25
Accounts receivable June 30, 1934 __   _____   ____________                                                    5, 012. 15
          Unobligated balance available June 30, 1934____________                                              27, 333. 40
                 RIVERS AND HARBORS-BOSTON,                           MASS.,                 DISTRICT                    45
                                        PUBLIC   WORKS       FUNDS


Cost of new work to June 30, 1934_----------------------------_                                         $588, 320. 25
Cost of maintenance to June 30, 1934_
           Total cost of permanent work to June 30, 1934----------_                                         588, 320. 25
Minus accounts payable June 30, 1934 ----                                           ------                   75, 361. 69

           Net total expenditures                        _                     --                           512, 958. 56
Unexpended balance June 30, 1934-----------------------------                                               287, 041. 44
           Total amount appropriated to June 30, 1934-._._                                                  800, 000. 00

           Fiscal year ending June 30            1930         1931                   1932           1933          1934


Cost of new work-__
                  ..    ..                                                                                     $588, 320.25
Cost of maintenance
Total expended___                                                                                               512, 958. 56
Allotted                                                                                                        soo800,
                                                                                                                   000. 00


Amount allotted from National Industrial Recovery Act approved
June 16, 1933       _______________________                                                               $800, 000. 00
Gross amount expended ______________________________________                                                512, 958. 56
           Balance unexpended June 30, 1934                             --------                            287, 041. 44
Amount covered by uncompleted contracts---------------------                                                256, 231. 35
     Balance available June 30, 1934------------------------                                                  30, 810. 09
Amount allotted by Public Works Administration Emergency Ap-
propriation Act, fiscal year 1935----------------------------                                               260, 000. 00
           Balance available for fiscal year 1935-------------------                                        290, 810. 09

Amount (estimated) required to be appropriated for completion
of Public Works Administration project____________________                                                4, 059, 800. 00
Amount that can be profitably expended in fiscal year ending
                               -
June 30, 1936, for new work 1_____________ ______________                                                    80, 000.    00


      CONSOLIDATED COST AND FINANCIAL SUMMARY FOR BOSTON HARBOR, MASS,

Cost of new work to June 30, 1934                                   -------                          12, 893, 674, 24
Cost of maintenance to June 30, 1934__
                                     -----------------------                                               1, 383, 402. 95

       Total cost of permanent work to June 30, 1934---------- 14, 277, 077. 19
Value of plant, materials, etc., on hand June 30, 1934 .------
                                                              __    30, 019. 93

            Net total cost to June 30, 1934------_                                                    14, 307, 097. 12
Plus accounts receivable June 30, 1934_
                                      ------------------------                                                  5, 012. 15

       Gross total costs to June 30, 1934--------------------                                          14, 312, 109. 27
Minus accounts payable June 30, 1934____________________                                                   79, 543. 26

      Net total expenditures---------------------------                                                14, 232, 566. 01
Unexpended balance June 30, 1934____________________________                                              315, 094. 07

            Total amount appropriated to June 30, 1934                                -        --      14, 547, 660. 08

    1Exclusive of available funds.
46           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                          1934


           Fiscal year ending June 30           1930            1931           1932           1933            1934


Cost of new work_                            $30, 410. 80   $22, 156. 30   .... ___..          ...
                                                                                          ____________     $588, 320. 25
Cost of maintenance__                         16, 994. 90     8, 338. 29      $2, 841. 78 $117, 052. 97     103, 662. 09
      Total cost__________________________    47, 405. 70    30, 494. 59     2, 841. 78   117, 052. 97      691, 982. 34
Total expended-.......                        49, 776. 90    37, 684. 90     9, 212. 51   104, 776. 02      637, 834. 44
Allotted     .____________________________    55, 000. 00    32, 500. 00                  237, 902. 52      782, 394. 98



Balance unexpended July 1, 1933____________                                                          $170, 533. 53
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934________________ _______ $26, 000
Amount allotted from War Department Appropriation
  Act approved July 14, 1932 ---------------------------   8, 500
Amount allotted from War Department Appropriation
Act approved Feb. 23, 1931                                 8, 500
Amount allotted from National Industrial Recovery Act
  approved June 16, 1933------------______        ______ 800, 000
                                                                                                      843 vvv. 00
                                                                                                      vi, non  VV

      Amount to be accounted for---------------------------     1, 013, 533. 53
Deductions on account of revocation of allotment__ ____---__- -     60, 605. 02

      Net amount to be accounted for_                                                                 952, 928. 51
Gross amount expended___________________________ $710, 302.46
Less:
    Reimbursements collected ________ $72, 158. 82
    Receipts from sales ____---__---._     309. 20
                                                                                 72, 468. 02
                                                                                                      637, 834. 44
Balance unexpended June 30, 1934________________________         315, 094. 07
Outstanding liabilities June 30, 1934                5, 672. 93
                                                    $----------------
Amount covered by uncompleted contracts- -- ___-__ 256, 289. 80
                                                                  261, 962. 73
           Balance available June 30, 1934________                                                        53, 131. 34
Accounts receivable June 30, 1934____.____                         ________________                        5, 012. 15

     Unobligated balance available June 0, 1934__ ________                                                58, 143. 49
Amount allotted by Public Works Administration Emergency Ap-
propriation Act, fiscal year 1935__                                                                  260, 000. 00

           Balance available for fiscal year 1936_____________                                        318, 143. 49

Amount (estimated) required to be appropriated for completion
   of Public Works Administration project                   1_____________________                4, 059, 800. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1936, for new work 1_- - _- - -
                                          _________________                                               80, 000. CO
                               7. PLYMOUTH HARBOR, MASS.

  Location.-This harbor is 45 miles by water south of Boston. Its
outer anchorage, the " Cow Yard ", is common to Plymouth, Dux-
bury, and Kingston. (See U. S. Coast and Geodetic Survey Chart
No. 245.)
  Previous pro)ects.-Adopted by acts of May 26, 1824, March 3,
1875, and 1877, 1884, and 1885. The cost and expenditures were
$188,646.59 for new work and $2,013.21 for maintenance, a total of
$190,659.80, from United States funds. For further details see page
1746 of Annual Report for 1915.
   1Exclusive of available funds.
          RIVERS AND HARBORS-BOSTON,        MASS.,   DISTRICT      47
   Existing project.-This provides for (a) protecting by riprap the
sections of Long Beach damaged by the storm of November 1898,
and for restoring Eel River to its former course; (b) dredging a
channel 18 feet deep at mean low water and 200 feet wide, increased
at the entrance and on curves, from the bay to the town wharves, a
distance of about 2.5 miles, with a suitable turning basin at the inner
end; and (c) dredging a channel 150 feet wide, 15 feet deep at mean
low water, extending in a northwesterly direction about 0.3 mile from
a point off the site of northerly Craigs Wharf (now State Pier) with
a turning basin 300 feet square, and of the same depth, at its north-
westerly end; this channel to be connected with the 18-foot channel
by an area to be dredged by the Commonwealth of Massachusetts
or other local interests. The mean range of tide is 9.6 feet; the
extreme range is 13.7 feet.
   The estimates of cost for new work, exclusive of amounts expended
on previous projects, were as follows: (a) For beach protection,
$95,700, made in 1899; (b) for dredging, $167,000, made in 1911;
 (c) for dredging channel and turning basin, $102,000, made in 1920.
The latest (1917) approved estimate for annual cost of maintenance
is $500 for beach protection and $5,000 for dredging.
   The existing project was authorized by the following river and
harbor acts: (a) The act of March 3. 1899, provided for the beach
protection (Annual Report for 1899, p. 1089); (b) the act of March
4, 1913, provided for dredging the 18-foot channel (H. Doc. No. 1194,
62d Cong., 3d sess.) ; (c) the act of September 22, 1922, provided for
the 15-foot extension, including the turning basin (H. Doc. No. 996,
66th Cong., 3d sess.) The latest published map is in the last-men-
tioned document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are two wharves open to the public
free of charge; one of which is owned by the Commonwealth of
Massachusetts, the other by the town. The easterly end of the town
wharf is used for the receipt and storage of coal. The facilities
appear to be adequate for existing demands.
   Operations and results during fiscal year.-Maintenance dredging,
under contract, for restoring a depth of 15 feet at mean low water
was commenced December 2, 1933, and was completed April 30, 1934.
During the period 128,188 net cubic yards, scow measurement, of ma-
terial was removed. A depth of 15 feet was secured from the
harbor entrance to the town wharf at Plymouth. The costs and
expenditures were $49,466.55, all for maintenance.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1927 at a saving of $68,129 under the estimated cost. Work
of protecting by riprap the sections of Long Beach damaged by
the storm of 1898 was completed in 1905. Eel River was restored
to its former course in 1904. The dredging of a channel 18 feet deep
at mean low water was completed in 1915. The 15-foot channel
was completed in 1927. The controlling depth in 1934 was 15 feet
at mean low water. Cost and expenditures under the existing
project have been $279,991.55, of which amount $188,571.16 was
for new work, and $91,420.39 for maintenance. In addition, $108,400
has been expended from contributed funds, of which $108,000 was
for new work, and $400 was for maintenance.
     91536-ENG 1934-4
48            REPORT OF CHIEF OF ENGINEERS,                                       U. S. ARMY,               1934

  Proposed operations.-No funds are available and no work is pro-
posed during the fiscal years of 1935 and 1936.
                                     Cost and financial summary

Cost of new work to June 30, 1934--                                                                              $377, 217. 75
Cost of maintenance to June 30, 1934                                                                               9----------------------
                                                                                                                   93, 433. 60
         Total cost of permanent work to June 30, 1934                                    -----------            1470, 651. 35

         Net total expenditures--                                                                                1470, 651. 35
Unexpended balance June 30, 1934__                                                                                   6, 384. 30
         Total amount appropriated to June 30, 1934                                                               4---------------77,
                                                                                                                        035. 65


         Fiscal year ending June 30                    1930            1931               1932            1933           1934


Cost of new work__        -     -        -             --         -     -             -   -             - -..
Cost of maintenance   .   ___        -       --.                                                                      $49, 466. 55
Total expended-___                                            _       _49,                                                466.55

Allotted_-_                                                                                                            55, 850. 85




Amount allotted from War Department Appropriation Act approved
July 14, 1932------      ----------------------------------   $56, 000. 00
Deductions on account of revocation of allotment                     49. 15
                                                                    1------------------

        Net amount to be accounted for----------------------------55,                                                   850. 85
Gross amount expended- ---                         _          ------         ------                                49, 466. 55

        Balance unexpended June 30, 1934--------------------------                                                   6, 384. 30

                                    8. CAPE COD CANAL, MASS.


   Location.-This waterway is a sea-level canal, extending from the
head of Buzzards Bay, Mass., to a point on Cape Cod Bay, about 15
miles southeast of Plymouth Harbor, Mass. In general direction the
canal trends from Buzzards Bay easterly to Cape Cod Bay. (See
U. S. Coast and Geodetic Survey Charts Nos. 251 and 1208.)
   Existing project.-This provides for the purchase of the canal
from the Boston, Cape Cod & New York Canal Co. at a cost of
$11,500,000 in accordance with the contract dated July 29, 1921, exe-
cuted by the Boston, Cape Cod & New York Canal Co. and printed in
House Document No. 139, Sixty-seventh Congress, second session.
The purchase of the canal was authorized by section 2 of the river
and harbor act approved January 21, 1927.
   The construction of bridges over the canal and widening, as recom-
mended by the Chief of Engineers in House Document No. 795,
Seventy-first Congress, third session, have been included in the Pub-
lic-Works program under the National Industrial Recovery Act. A
map of the canal and approaches is printed in House Document No.
795, Seventy-first Congress, third session.
   Recommended modifications of project.-Under date of March 2,
1931, the Chief of Engineers recommended modification of the exist-
ing project so as to provide a lock canal with one lock 110 feet wide
  1Exclusive cf $108,400 expended from contributed funds.
          RIVERS AND      HARBORS-BOSTON,     MASS.,   DISTRICT        49
and 1,000 feet in usable length, having 40 feet over the sills, and a
depth in the canal and approaches of 30 feet, with a width of 250 feet
in the land cut, a width through Buzzards Bay of 400 feet to Wings
Neck in a new straight alinement and of 700 feet beyond Wings
Neck, together with a highway bridge of adequate vertical clearance
and suitable railroad crossing, and a 15-foot channel into Onset Bay,
all at an estimated cost of $23,250,000, with $250,000 annually for
maintenance. (H. Doc. No. 795, 71st Cong., 3d sess.) Construction
of bridges and dredging authorized under Public Works program.
   Terminal facilities.-The only terminals on the canal are those of
the Canal Fish Freezing Co. and the Standard Oil Co. The former
is used for the receipt and freezing of fish and the latter for the
receipt and storage of oil. The terminals are considered adequate
for the purposes for which they are used. The Commonwealth of
Massachusetts has constructed a State pier on the north bank of
the canal at Bourne Neck.
             OPERATIONS   AND RESULTS   DURING   FISCAL YEAR

   Project adopted by Congress.-The U. S. sea-going dredge 1Min-
quas was employed throughout the year in maintenance dredging in
the canal and approaches thereto. There were removed 295,197 cubic
yards, bin measurement, of material and 88,850 cubic yards by agita-
tion, resulting in a total of 384,047 cubic yards, at a cost of $89,527.23
for maintenance.
   The contract for dredging a strip 25 feet deep and 70 feet wide
from the vicinity of station 190+00 to station 400+00, all main-
tenance, in progress at the beginning of the fiscal year was suspended
December 29, 1933. During the period there were removed 65,742
cubic yards, scow measurement, of ordinary material and 3,167.5
cubic yards of boulders, each exceeding 112 cubic yards, of which
amount 29,404 cubic yards of ordinary material and 429.2 cubic yards
of boulders, have been paid for at a cost of $22,069.04, all for main-
tenance. Payment for the balance of the material removed has been
withheld due to termination of the contract February 10, 1934.
The contractor filed a petition in bankruptcy January 17, 1934, and
contract was terminated February 10, 1934.
   Under a contract for performing the uncompleted portion of the
dredging contract, which was terminated February 10, 1934, work
was commenced June 5, 1934 and was in progress at the close of the
fiscal year. During the period 161,508 cubic yards, scow measure-
ment, of ordinary material, and 1,325.2 cubic yards of boulders, each
exceeding 112 cubic yards, were removed at a cost of $76,812.11 for
maintenance.
   Under a contract for revetment of portions of the south bank
of the canal. maintenance work was commenced May 25, 1934, and
was in progress at the close of the fiscal year. During the period
1,299 tons of riprap and broken stone were placed within a length
of 1,375 feet of the canal bank at a cost of $4,143.03 for maintenance.
   By hired labor, emergency riprapping of portions of the south
bank of canal was done. There were placed 538.23 tons of stone
at a cost of $2,071.01 for maintenance.
50     REPORT   OF CHIEF OF ENGINEERS,     U.   S. ARMY,   1934


   The total costs from regular funds were $194,755.43, all for main-
tenance. Expenditures were $171,792.29.
   Project authorized by Federal Emergency Administration of Pub-
lic Works.--The following work was done under Public Works' con-
tracts: The construction of substructures of two high-level highway
bridges was commenced December 8, 1933, and was in progress at the
close of the fiscal year. During the period the four bridge seat por-
tions of the abutments and the four intermediate piers of the Bourne
Bridge were completed. Cofferdam work was in progress on the
four main channel piers which are about 75 percent completed. The
costs were $925,872.79 for new work. The contract is about 65 per-
cent completed.
   The construction of substructure of a vertical-lift railroad bridge
was commenced December 18, 1933, and was in progress at the close
of the fiscal year. During the period the north abutment was prac-
tically completed and cofferdam work on the two main channel
piers was in progress. The costs were $164,244.05 for new work.
The contract is about 40 percent completed.
   The construction of superstructures of two high-level highway
bridges was commenced May 1, 1934, and was in progress at the close
of the fiscal year. On the Bourne Highway Bridge, two steel spans
were erected, but not riveted, between the abutments and interme-
diate piers on both sides of the canal. The costs were $263,080.65 for
new work. The contract is about 35 percent completed.
   The construction of approaches to Sagamore Bridge was com-
menced May 24, 1934, and was in progress at the close of the fiscal
year. Work consisted in clearing and grubbing of brush and trees,,
about 17 acres of land, the excavation of 23,238 cubic yards of earth,
ledge, peat, and the laying of drainage pipe. The costs were $7,-
872.72 for new work. The contract is about 5 percent completed.
   The construction of approaches to Bourne Bridge was commenced
June 21, 1934, and was in progress at the close of the fiscal year.
Work consisted in clearing and grubbing of brush, about 6 acres of
land. The costs were $575.68 for new work. The contract is about
1 percent completed.
   Under contract for expert engineering services in designing and
supervising construction of vertical-lift railroad bridge the, costs
were $19,962.53 for new work.
   Under contract for expert engineering services in designing and
supervising construction of two high-level highway bridges the costs
were $54,370.94 for new work.
   By hired labor with Public Works funds, test borings were made
at the bridge sites with Government owned and.rented equipment at
a cost of $14,565.75 for new work.
   Other hired labor operations with Public Works funds consisted
in fencing reservation for right-of-way at Sagamore Bridge and
making metal signs, etc. The costs were $971.04 for new work.
   The total costs from Public Works funds were $1,451,516.15, all
for new work. Expenditures were $970,243.77.
    Condition at end of fiscal year.-The controlling depth in the
canal on June 30, 1934, was 19.2 feet at mean low water. The con-
trolling depths in the Buzzards Bay and Cape Cod Bay approach
channels were, respectively, 22.6 and 22.3 feet at mean low water.
           RIVERS AND HARBORS-BOSTON,                           MASS., DISTRICT                51

'The canal and properties were taken over by the United States on
March 31, 1928, at a cost of $11,500,000.
  The total cost of the existing project has been $12,571,958.68, of
which $11,500,000 (the purchase price) was for new work and $1,-
071,958.68 for maintenance. Expenditures have been $12,638,055.85.
   The work of constructing two high-level highway bridges: and a
vertical-lift railroad bridge with Public Works funds is about 30
percent completed.
   The total costs from Public Works funds were $1,451,516.15, all
for new work. Expenditures were $970,243.77.
   Proposedoperations.-The balance unexpended, including accounts
receivable, at the end of the fiscal year, together with an allotment
of $1,000,000 made during July 1934 from Public Works Adminis-
tration funds, a total of $5,070,703.41, of which $440,947.18 pertains
to regular funds and $4,629,756.23 to Public Works Administration
funds, will be applied as follows:
Regular funds:
    Accounts payable June 30, 1934----- --------------------                          $30, 104. 73
    Maintenance :
        Dredging by Government-owned dredges throughout the
          fiscal year____________________________________                             135, 000. 00
        Complete by Nov. 30,                  1934, dredging under a contract in
         force, widening the                  canal channel to a bottom width of
         170 feet and project                 depth of 25 feet at mean low water_     272, 202. 84
        Complete by Aug. 31,                  1934, revetment of portions of the
         south bank of the                    canal----------------------------          3, 639. 61

              Total---------------_--------                                           440, 947. 18

Public Works Administration funds:
    Accounts payable June 30, 1934----------------------------                        483, 773. 83
    New work: Construction of bridges by contract, as follows:
        Vertical-lift railroad bridge at Buzzards
          Bay (July 1934-Mar. 1936)---------- $1,407, 128.99
        High-level 4-lane highway bridges at
          Bourne (July-Dec. 1934) and Sagamore
          (July 1934-June 1935) _---------------- 2, 338, 853.41
                                                                                    3, 745, 982. 40
    Dredging, widening of the land cut channel between stations
     70+00 and 400+00, by contract (Nov. 1934-Apr. 1935)
     at an estimated cost of----------------------- ----------                        400, 000. 00

        Total----------------------------------------------4, 629, 756.23
  Completion of the new highway bridges by June 1935 and of the
new railroad bridge about 6 months later will permit extensive
operations for the enlargement of the canal to be carried on during
the fiscal year 1936.
  The funds that can be profitably expended during the fiscal year
ending June 30, 1936 ($3,090,000) will be applied about as follows:
New work:
   Completion by June 30, 1936, of the new straight
      channel through Hog Island to a width of 250
      feet and a depth of 25 feet, removing 3,646,000
      cubic yards of material by contracts to be en-
      tered into___---------------------------------$1,468, 000
   Purchase of land, excavation in the dry, and placing
      of riprap for the complete project_---            1,532, 000
                                                         ------    $3, 000, 000
Maintenance: Dredging by United States hopper dredge----                90,000
      Total        --         ----- __-_-_------                                        3, 090, 000
52          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                     1934

                                        Cost and financial summary
                           MAINTENANCE               AND IMPROVEMENT                FUNDS


Cost of new work to June 30, 1934 ____________________                                                 $11, 500, 000. 00
Cost of maintenance to June 30, 1934_                                                                     11, 071, 958. 68

      Total cost of permanent work to June 30, 1934______                                                 12, 571, 958. 68
Value of plant, materials, etc., on hand June 30, 1934________                                                 95, 897. 60

         Net total cost to June 30, 1934__ _________________                                              12. 667. 856. 28
Plus accounts receivable June 30, 1934______________________                                                          304. 30

      Gross total costs to June 30, 1934 ________________                                                 12. 668, 160. 58
Minus accounts payable June 30, 1934________________-------                                                    30, 104. 73

        Net total expenditures _ _-_-_______                             - -                              12, 638, 055. 85
Unexpended balance               June 30, 1934 _______________________                                           440, 642. 88

        Total amount appropriated to June 30, 1934__________                                              13, 078, 698. 73

   Fiscal year ending June 30               1930            1931                 1932              1933               1934


Cost of new work ....-.                    . I--                                                                    --------
Cost of maintenance                      $157, 904. 56   $116, 043. 24     $167, 380. 79      1 $325, 180. 49       $194, 755. 43

Total expended------             - --     139, 274. 02    147, 454. 83         157, 606. 93     317, 722. 09         171, 792. 29
Allotted---------          ---            205, 000. 00    153, 000. 00----------                663, 640. 11         227, 503. 17

1 Increased by $742.65 due to absorbing proportionate share of cost of division idle plant.

Balance unexpended July 1, 1933___________________________                                                      $384, 932. 00
Amount allotted from War Department Appropria-
  tion Act approved Apr. 26, 1934                                        ---.        $87, 000. 00
Amount allotted from War Department Appropria-
tion Act approved July 14, 1932 ______________ 127, 204. 05
Amount allotted from War Department Appropria-
tion Act approved Mar. 4, 1933__________________ 20, 000. 00
                                                                                                                 234, 204. 05
Amount to        be accounted             for________________________________                                    619, 136. 05
Deductions on account of revocation of allotment_____________                                                      6, 700. 88

      Net amount to be accounted for                                     ________________                        612. 435. 17
Gross amount expended-. -                                                            178, 366. 33
Less reimbursements collected        --                                                6, 574. 04
                                                                                                                 171, 792. 29
      Balance unexpended June 30, 1934______________________                                                     440, 642. 88
Outstanding liabilities June 30, 1934________________   2, 160. 56
Amount covered by uncompleted contracts- ---.---      362, 326. 67
                                                                                                                 364, 487. 23

      Balance available June 30, 1934_____________________                                                        76, 155. 65
Accounts receivable June 30, 1934___________________________ _                                                        304. 30
Unobligated balance available June 30, 1934__________________                                                     76, 459. 95
Amount that can be profitably expended in fiscal year
  ending June 30, 1936, for maintenance                        2______                                            90, 000. 00

  1Increased by $742.65 due to absorbing proportionate share of cost of division idle plant.
  2 Exclusive of available funds.
                     RIVERS. AND HARBORS                       BOSTON,             MASS.,                            DISTRICT                     53
                                               PUBLIC WORKS           FUNDS


Cost of new work to June 30, 1934---------------------                                                                            $1, 451, 516. 15
Cost of maintenance to June 30, 1934________________________
      Total cost of permanent work to June 30, 1934__________                                                                      1, 451, 516. 15
Value of plant, materials, etc., on hand June 30, 1934 __________                                                                       2,501. 45
     Net total cost to June 30, 1934                                                                                               1, 454, 017. 60
Minus accounts payable June 30, 1934________________________                                                                          483, 773. 83
     Net total expenditures____________________________                                                                               970, 243. 77
Unexpended balance June 30, 1934____________________________                                                                       3, 629, 756.23
            Total amount appropriated to June 30, 1934_____________                                                                4, 600, 000. 00


   Fiscal year ending June 30                  1930            1931                      1932                              1933            1934

                                                                                 -- --   - -       - -   -
Cost of new work___                                                                                                                    $1,451,516.15
Cost of maintenance                                                          --------------                      I

                                                                                                                                      ---------------
Total expended                                                                                                                            970, 243.77
A llotted    _ _........   ....   ....   ..                                                                                                     00
                                                                                                                                        4,600,000.



Amount allotted from National Industrial Recovery Act approved
  June 16, 1933-------------------------------------------- $4, 600, 000. 00
Gross amount expended                                   244.34
                                                   $-------------------------970,
Less reimbursements                      collected---                 --                                                0. 57
                                                                                                                                      970, 243. 77
      Balance unexpended June 30, 1934-__                                                                     _                    3, 629, 756. 23
Outstanding liabilities June 30, 1934__                               ----                               2, 771. 88
Amount covered by uncompleted contracts -----                                            2, 712, 842.66
                                                                                                                                   2, 715, 614.- 54
     Balance available June 30, 1934___----------------- --- ----                                                                    914, 141. 69
Amount allotted by Public Works Administration Emergency
Appropriation Act, fiscal year 1935_ _ ____   _       __--._._                                                                    1, 000, 000. 00
            Balance available for fiscal year 1935_ __-                                                              ____----      1, 914, 141. 69

Amount (estimated) required to be appropriated for completion
of Public Works Administration project---------------------                                                                       8, 118, 000. 00
Amount that can be profitably expended in fiscal year ending
   June 30, 1936; for new work                        2_____                                                                       3, 000, 000.00

             CONSOLIDATED COST AND FINANCIAL                     SUM MARY FOR CAPE COD CANAL

Cost of new work to June 30, 1934 _                                                                                              $12, 951, 516. 15
Cost of maintenance to June 30, 1934                                                                                              31, 071, 958. 68
      Total cost of permanent work to June 30, 1934 --------                                                                      14, 023, 474. 83
Value of plant, materials, etc., on hand June 30, 1934 -------                                                                         98, 399. 05
      Net total cost to June 30, 1934_-                                                                                           14, 121, 873. 88
Plus accounts receivable June 30, 1934-------------------------                                                                            304. 30

            Gross total costs to June 30, 1934 .---                                                                             _ 14, 122, 178. 18
Minus accounts payable June 30, 1934-......                                                                                           513, 878. 56

     Net total expenditures __      ----                                                                                          13, 608, 299. 62
Unexpended balance June 30, 1934_..                                     --                     -             -                     4, 070, 399. 11

            Total amount appropriated to June 30, 1934_--                                                                         17, 678, 698. 73

  2Exclusive           of available funds.
   3Increased by $742.65 due to absorbing proportionate                                   share of cost of division idle
plant.
54         REPORT OF            CHIEF OF ENGINEERS, U.                           S. ARMY,           1934


   Fiscal year ending June 30             1930                1931           1932             1933               1934


Cost of new work ---                                                                      S$325, 180. 49     $1, 451, 516. 15
Cost of maintenance-                  $157, 904. 56       $116, 043. 24   $167, 380. 79                          194, 755. 43
                                                                                            325,180.49
      Total cost
               -----                      904.56
                                       157,                116,  24
                                                              043.         167, 380. 79                       1, 646, 271.58
Total expended .....                   139, 274. 02        147, 454. 83    157,606.93       317, 722.09       1, 142, 036. 06
Allotted _--                              000. 00
                                       205,                153, 000. 00                     663,640. 11       4, 827, 503. 17

  1Increased by $742.65 due to absorbing proportionate share of cost of division idle
plant.

Balance unexpended July 1, 1933_---                                                                        $384, 932. 00
Amount allotted from War Department Appropria-
tion Act approved Apr. 26, 1934 _________________  $87,                                  000. 00
Amount allotted from War Department Appropria-
  tion Act approved July 14, 1932__________________ 127,                                  204. 05
Amount allotted from War Department Appropria-
  tion Act approved Mar. 4, 1933_                    20,                                  000. 00
Amount allotted from National Industrial Recovery
Act approved June 16, 1933_____________________ 4, 600,                                  000. 00
                                                                                                      4, 834, 204. 05
      Amount to be accounted for _____________________________ 5, 219, 136.05
Deductions on account of revocation of allotment_        ____       6, 700. 88
      Net amount to be accounted for-------------------------      5, 212, 435. 17
Gross amount expended ...           ------        $1, 148, 610. 67
Less reimbursements collected__________________         6, 574. 61
                                                                   1--, 142, 036. 06

      Balance unexpended June 30, 1934______________________ 4, 070, 399. 11
Outstanding liabilities June 30, 1934_______________ $4, 932. 44
Amount covered by uncompleted contracts--------- 3, 075, 169. 33
                                                                 3. 080 101.77

      Balance available June 30, 1934 ________                                                              990, 297. 34
Accounts receivable June 30, 1934___                                                                             304. 30

     Unobligated balance available June 30, 1934_                 990, 601. 64
Amount allotted by Public Works Administration Emergency Ap-
propriation Act, fiscal year 1935_______________-____________ 1, 000, 000. 00

        Balance available for fiscal year 1935___                                                     1, 990, 601. 64

Amount (estimated) required to be appropriated for completion
of Public Works Administration project--------------------- 8, 118, 000. 00

Amount that can be profitably expended in fiscal year ending
  June 30, 1936 :
    For new work 1___-----------------------------------     3, 000, 000. 00
      For maintenance           __------------------------------90,000.                                                  00

         Total    _____-----------------------                                                        3,090, 000.00

           9. OPERATING AND CARE OF CAPE COD CANAL, MASS.

  The improvement for which report is made under this caption
forms part of the project for the Cape Cod Canal, Mass. See pages
48 to 54, where general information regarding the improvement can
be found. The canal has been operated and maintained under the
permanent indefinite appropriation since March 31, 1928.
   1 Exclusive of available funds.
                RIVERS AND HARBORS-BOSTON,                              MASS.,         DISTRICT                      55
   Operations and results during fiscal year.-The canal was open to
navigation throughout the year.       Hired labor was employed in
making repairs to bulkheads, dolphins, bridges, lighting and signal
system, floating plant, and buildings. The two highway bridges and
the railroad bridge were operated throughout the year. The ex-
penditures during the year were $172,946.65, and the costs $176,-
347.79, all for maintenance.
   Condition at end of fiscal year.-The canal and properties were
taken over by the United States on March 31, 1928, at a cost of
$11,500,000. The controlling depth on June 30, 1934, was 19.2 feet
at mean low water in the canal and 22.6 and 22.3 feet at mean low
water in the Buzzards Bay and Cape Cod Bay approach channels,
respectively. The total amount expended from the permanent in-
definite appropriation to the close of the fiscal year was $1,441,-
164.43, and the total cost has been $1,448,580.76, all for maintenance.
  Proposed operations.-The canal, highway, and railroad bridges,
and signal system, will be operated and maintained under allotments
from appropriations made available for such purposes.
                                   Cost and financial summary

Cost of maintenance to June 30, 1934 _______________                                            - $1, 448, 580. 76
Value of plant, materials, etc., on hand June 30, 1934_                                                 -944. 08
           Net total cost to June 30, 1934_______________                                           1, 447, 636. 68
Plus accounts receivable June 30, 1934______________                                                       1, 358. 91

     Gross total costs to June 30, 1934_                                                            1, 448, 995. 59
Minus accounts payable June 30, 1934______________                                                         7, 831. 16

           Net total expenditures____________________                                               1,441, 164.43
Unexpended balance June 30, 1934__________________                                                     24, 781. 58

           Total amount appropriated to June 30, 1934__                                             1, 465, 946.01


   Fiscal year ending June 30             1930            1931            1932              1933              1934


Cost of new work .    ---------    -
Cost of maintenance _...........       $273, 760. 03   $278, 210. 94   $235, 803. 51   1$203, 109. 44       $176, 347. 79
      Total expended   ------------
                             275, 827. 13 294, 417. 61                  241, 948. 65      197, 740. 57       172, 946. 65
Allotted             _      _           275, 000. 00    300, 000. 00    245, 000. 00     211, 755. 28        165,190. 73

1 Reduced by $3.44 due to reimbursement of impounded savings.

Balance unexpended July 1, 1933________________________________                                          $32, 537. 50
Amount allotted from permanent indefinite appropriation, sec.
6, River and Harbor Act, Mar. 3, 1909________________________                                           185, 625. 00
           Amount to be accounted for______________________________                                      218, 162. 50
Deductions on account of revocation of impounded funds-........                                           20, 434. 27
      Net amount to be accounted for_____________                                                        197, 728. 23
Gross amount expended                                                            $186, 805.97
Less reimbursements collected__                                                    13, 859. 32
                                                                                                         172, 946. 65
           Balance unexpended June 30, 1934 _________________                                             24, 781. 5&
  1Reduced by $3.44 due to reimbursement of impounded savings.
56              REPORT     OF       CHIEF OF ENGINEERS,                      U.    S.       ARMY,         1934

Outstanding liabilities June 30, 1934_____                                                  $8, 828. 17
Amount covered by uncompleted contracts-                                                    2, 500. 00
                                                                                                                $11, 328. 17
      Balance available June 30, 1934___________________________                                                 13, 453. 41
Accoints receivable June 30, 1934______________________________                                                   1, 358. 91

          Unobligated balance available June 30, 1934                                                            14, 812. 32
Amount allotted for fiscal year 1935_______________________                                                     175, 000. 00

          Balance available for fiscal year 1935___________________                                             189, 812. 32

   10. EXAMINATIONS,                  SURVEYS, AND CONTINGENCIES                                     (GENERAL)

    The cost of work during the year amounted to $13,367; the ex-
penditures were $13,198.65. The balance unexpended June 30, 1934,
amounting to $30,682.41, will be applied as needed during the fiscal
year 1935 to payment of expenses incurred in connection with the
above items. The additional sum of $30,000 can be profitably
expended during the fiscal year ending June 30, 1936.
                                      Cost and filancial summary

Cost of maintenance to June 30, 1934_______________                                                   -        $197, 023. 12
Value of plant, materials, etc., on hand June 30, 1934_                                                           1, 342.13

      Net total cost to June 30, 1934_                                                                          198, 365. 25
Plus accounts receivable June 30, 1934______________                                                                   5.00

      Gross total costs to June 30, 1934___                                                                     198, 370. 25
Minus accounts payable June 30, 1934_______________                                                                 898.48

     Net total expenditures_________                                                                            197, 471. 77
Unexpended balance June 30, 1934______________                                                                   30, 682.41

         Total amount appropriated to June 30, 1934__                                                           228, 154.18


    Fiscal year ending June 30            1930                1931             1932               1933              1934


Cost of new work__
Cost of maintenance ----    _-___       $20, 037. 55    $59, 474. 06         $72, 635. 36     1 $26, 927. 95       $13, 367. 00

Total expended             ---
                            -            20, 406. 79         58, 553. 04      73, 565. 23       28, 322. 56         13, 198. 65

Allotted-....                            18, 000. 00    100, 400. 00          20, 000. 00       27, 385. 97         43, 868. 21


  1 Reduced by $4.52 due to reimbursement of impounded savings.

Balance unexpended July 1, 1933 _ _                            -_______---                                _-         $12. 85
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934------------------------ $29, 000. 00,
Amount allotted from War Department Appropriation
   Act approved March                4, 1933-          ---                                   36, 500. 00
                                                                                                                 65, 500. 00

     Amount to be accounted for                   __                                                             65, 512. 85
Deductions on account of revocation of allotment ------------                                        _           21, 631. 79

          Net amount to be accounted for___                                                                      43, 881. 06
   1Reduced by $4.52, due to reimnbursement of impounded savings.
                RIVERS      AND     HARBORS-BOSTON,                        MASS.,          DISTRICT                       57

Gross amount expended_ ________                                                          $17,263. 05
Less reimbursements collected ___
                              --                            -              _     _         4, 064. 40
                                                                                                                  $13, 198. 65

      Balance unexpended June 30, 1934                                                                             30, 682. 41
Outstanding liabilities June 30, 193s  -                                                         -                     921. 32
         Balance available June 30, 1934_                                                                          29, 761. 09
Accounts receivable June 30, 1934 __ -_-                                             -                --                 5. 00

       Unobligated balance available June 30, 1934        ___                                                      29, 766. 09
Atmount that can be profitably expended in fiscal year ending June
  30, 1936, for maintenance 1 _____ ____________                                                                   30, 000. 00

              11. Other projects for which no estimates are submitted
                    [Commercial statistics for these projects are given in pt. 2 of report]


                                                                         Cost and expenditures to
                                                        For last full          June 30, 1934                       Estimated
                  Name of project                        report see                                                amount re-
                                                        Annual Re-                                                  quired to
                                                          port for        New work         Maintenance              complete


St. Croix River, Maine 1-                                   1924          $200, 441. 46         $6, 450. 19        Completed.
Bar Harbor, Maine 2_                                        1931           406, 591. 12                            $57, 900.
Penobscot River, Maine 1_-                                  1922            501, 020. 53         5, 279. 47        Completed.
Belfast Harbor,1 Maine 1__                                  1897             61, 561. 45                                Do.
Camden Harbor, Maine 1            -                         1931.           102, 400. 00        30, 200. 00             Do.
Rockland Harbor, Maine 2---------------------..             1931           915, 862. 73         24, 637. 27             Do.
Boothbay Harbor, Maine 1                                    1915             18, 000. 00                                Do.
Kennebec River, Maine 1-                                    1931           895, 849. 41         26,   061.   62         Do.
Saco River, Maine 1                                         1932        3 4 489, 352. 84        19,   843.   42    $22, 500.
Kennebunk River, Maine 1                                    1933             83, 584. 01        48,   030.   23    Completed.
Union River, Maine 15... 1                                  1912            176, 854. 85        14,   095.   15         Do.
Portsmouth Harbor, N. H.                                    1892            130, 567. 11                                Do.
Newburyport Harbor, Mass.2 ------------------.              1933           463, 843. 62        ' 42, 864. 51       $135, 700.
Merrimack River, Mass.'                                     1924           369, 891. 49          34, 575. 23       Completed.
Ipswich River, Mass.' 5 2                                   1895              5, 617. 91                                Do.
Rockport Harbor, Mass. 5                                    1905             91, 229. 25                                Do.
Manchester Harbor, Mass.1 5 .-.................             1908             23, 985. 57            591.89              Do.
Beverly Harbor, Mass.1......                                1931         7246, 047. 76              642. 65             Do.
Salem Harbor, Mass.___                                      1931            100, 456. 57         7, 500. 00             Do.
Mystic River, Mass.18               -                       1932           281, 150. 11         25, 534. 73             Do.
Malden River, Mass. --                                      1.922        9104, 853. 08          45, 096. 92             Do.
Dorchester Bay and Neponset lRiver, Mass.' _        _       1932             94, 584. 55        33, 591. 89        $162,000.
Weymouth Fore River, Mass."- ----------------               1932        12635, 900. 00           5, 250. 00        Completed.
Weymouth Back River, Mass."                                 1932             20; 478. 68         6, 521. 32             Do.
Hingham Harbor, Mass.'_____
                       2                                    1913             28, 316. 58        10, 000. 00             Do.
Scituate Harbor, Mass. -.                                   1931             95, 090. 98        31, 500. 00        $196,000.
Duxbury Harbor, Mass.' 5      ------------------.           1908             37, 000. 00   -        ___            $5,800.
Provincetown Harbor, Mass.2                                 1931           347, 453. 72             609. 00        $13,300.

     1 Channel adequate for commerce.
    2 Improvement adequate for commerce.
    3 Exclusive of $20,000 expended from contributed funds.
     4 Revoked during fiscal year 1933, $460.21.
    5 Abandonment recommended in H. Doc. No. 467, 69th Cong., 1st. sess.
    67 Remission  of liquidated damages $410 and $40 revoked, fiscal year 1934.
       Exclusive of $100,000 expended from contributed funds.
     8 Under State maintenance.
     9 Exclusive of $62,000 expended from contributed funds.
  to Awaiting local cooperation.
   11Awaiting congressional action on further improvement.
  12 Exclusive of $100,000 expended from contributed funds.

   1 Exclusive of available funds.
58          REPORT OF CHIEF OF ENGINEERS,                                  U.     S. ARMY,            1934

Status of reports called for by river and harbor acts and conmmittee resolutions
                                                                       I                     I

            Locality                      Authorization act
                                                                           Transmitted           Doc.     Recommenda-
                                                                           to Congress           no.          tion
                               SI                                      1                     I   __     !!_I __     __   _




Boston Harbor, Mass.      (Navy    Rivers and Harbors Com-
  drydock).                           mittee resolution, Apr. 10,
                                       1934.
Boston Harbor, Mass. (Shirley      Rivers and Harbors Com-
  Gut).                               mittee resolution, Feb. 10,
                                       1934.
Boston Harbor (Winthrop Rivers and Harbors Com-                            Aug. 10, 1933                  Unfavorable.
  Beach), Mass.                       mittee resolution, Feb. 7,
                                      1933.
Cape Cod Canal, Mass _________ Rivers and Harbors Com-
                                      mittee resolution, June 13,
                                      1934.
Chandlers River, Maine .......     Rivers and Harbors Com-
                                      mittee resolution, June 15,
                                      1934.
Corea Harbor, Maine __________ Rivers and Harbors Com-
                                      mittee resolution, Apr. 13,
                                      1934.
Dorchester Bay and Neponset        Rivers and Harbors Com-
  River, Mass.                        mittee resolution, Sept. 16,
                                      1933.
Long Cove, Maine______________ Senate committee resolution,
                                      June 5, 1934.
Lynn Harbor and Saugus River, Senate committee resolution,
  Mass.                               Apr. 12, 1934.
New Hampshire Coast, Rye River                 and   Harbor    Act,        May     3, 1934                        Do.
  Beach to Fox Head Point.            July 3, 1930.
Ogunquit Harbor and Perkins River              and Harbor      Act,        July    1,1933                         Do.
  Cove, Maine.                        July 3, 1930.
Portland Harbor, Maine, South River            and Harbor      Act,        Dec. 13, 1933                          Do.
  Portland waterfront.                July 3, 1930.
Royal River, Maine        .__________
                                   River       and Harbor      Act,
                                      July 3, 1930.
Rye Harbor, N. H_____________ River            and Harbor      Act,
                                      July 3, 1930.
Saco River, Maine___________ Rivers and Harbors Commit-
                                      tee resolution, Mar. 20, 1934.
Scituate Harbor, Mass _________ Rivers and Harbors Commit-
                                      tee resolution, Mar. 20, 1934.
Wohoa Bay and Pleasant River, Rivers and Harbors Act, July
  Maine.                              3, 1930.



IMPROVEMENT OF RIVERS AND HARBORS                                                                        IN THE
         PROVIDENCE, R. I., DISTRICT
  This district includes a part of the State of Massachusetts, com-
prising its southern coast line, extending as far north as Chatham
Harbor on the east coast line of Cape Cod, and the whole of the
States of Rhode Island and Connecticut, including the Connecticut
River, Conn. and Mass.
  District engineer: Maj. Charles J. Taylor, Corps of Engineers,
to September 11, 1933; Lt. Col. John J. Kingman, Corps of Engi-
neers since that date.
  Division engineer: Col. G. M. Hoffman, Corps of Engineers.
         RIVERS AND HARBORS-PROVIDENCE,                R.   I.,   DISTRICT    59
                                   IMPROVEMENTS

                                    Page                                     Page
1. Pollock Rip Shoals, Nan-               I1. Thames River, Conn ......       77
      tucket Sound, Mass .....        59   12. Connecticut River b el o w
2. Harbor of Refuge at Nan-                      Hartford, Conn __..._        79
      tucket, Mass_                   61   13. Duck Island Harbor, Conn__      82
3. Cross R'p Slicals, Nantucket           14. Branford Harbor, Conn_--.       83
      Sound, Mass--_                  62   15. New Haven Harbor, Conn__        84
4. New Bedford and Fairhaven              16. Milford Harbor, Conn .....      88
      Harbor, Mass-                   64   17. Housatonic River, Conn .-       90
5. Fall River Harbor, Mass___        66   18. Bridgeport Harbor, Conn___      92
6. Taunton River, Mass--             67   19. Norwalk Harbor, Conn.....       95
7. Providence River and Har-              20. Fivemile River Ha rb or,
      bor, R. I -______        _      69         Conn___                       96
8. Pawtucket (Seekonk) River,             21. Stamford Harbor, Conn ...       97
      R. I_                           71   22. Examinations, surveys, and
9. Harbor of Refuge at Block                    contingencies (general)__     99
      Island, R. I_--______   _       73   23. Other projects for which no
10. New London Harbor, Conn__         75          estimates are submitted_    100
         1. POLLOCK RIP SHOALS, NANTUCKET SOUND, MASS.

  Location.Pollock Rip Channel is the northerly passage through
the shoals off the eastern entrance to Nantucket Sound connecting
the deep water of the sound with that of the ocean. It is about 26
miles east from the harbor of Vineyard Haven, on the island of
Marthas Vineyard, Mass., and 60 miles south from Provincetown
Harbor, at the northern extremity of Cape Cod. (See U. S. Coast
and Geodetic Survey Chart No. 250.)
  Existing project. This provides for dredging through the shoals
at the eastern entrance to Nantucket Sound with a Government
dredge, which is to assist the natural agencies in obtaining such
depth and width as may be found practicable, but not exceeding a
depth of 30 feet at mean low water and a width of 1 mile. The
mean ranges of the tide are, respectively, about 3.7 feet at Monomoy
Point, the nearest land, and 6.7 feet at Chatham Light, about 9 miles
to the north of this point. The ranges of spring tides at these two
points are 4.4 and 7.9 feet. The ranges are largely affected by
direction and force of storms. The original expenditure authorized
for experimental work was $250,000, and later the operation of a
dredge was authorized at an estimated annual cost of $200,000. The
estimated cost, revised in 1928, of providing a channel of suitable
dimensions is $1,100,000 for new work and $30,000 for annual main-
tenance.
   The existing project was adopted by the River and Harbor Act of
July 25, 1912 (H. Doc. No. 536, 62d Cong., 2d sess.), and extended
by the act of July 27, 1916 (Rivers and Harbors Committee, Doc.
No. 3, 64th Cong., 1st sess.). The la,test map is published in the
Annual Report for 1915, page 2056.
   Terminal facilities.-None.
   Operations and resauts during fiscal year.-Maintenance dredging
was in progress with the U. S. dredge W. L. Marshall July 3 to 6,
7 to 9, both inclusive, and July 13, 1933. During these periods a total
of 39 875 cubic yards, bin measurement, was removed from the shoals
at the eastern end of the channel. Maintenance was resumed by
the Marshall on April 16 and completed on June 30, 1934. During
60                REPORT                OF       CHIEF OF                 ENGINEERS,                U.    S.    ARMY,        1934


this period there were removed, bin measurement, 427,777 cubic yards
of sand and gravel from the cut at the eastern end of the shoals;
84,509 cubic yards from shoals on the south side of the modified
alinement between buoys no. 3 and no. 5; similarly 4,119 cubic yards
from between buoys no. 7 and no. 9; and 43,351 cubic yards from
Bearse Shoal at no. 6 buoy, a total of 559,756 cubic yards. The total
cost was $50,791.56, all for maintenance. The expenditures were
$46,299.73.
   Condition at end of fiscal year.-The project is practically com-
pleted. The depths previously secured over the northern tongue of
the Stone Horse Shoal have been maintained and the bend in the
channel materially improved. A cut 2,000 feet wide has been dredged
through Bearse and Pollock Rip Shoals, in which the general depth
was 32 feet and over, and the least depth at the edges, 30 feet. On
June 30, 1934, the controlling depths were about 33 feet in the cut at
the eastern end of the shoals and 28 feet at the extreme southern edge
west of buoy no. 3 on the modified alinement. The costs under the
project have been $1,083,504.41 for new work and $334,925.89 for
maintenance, a total of $1,418,430.30, and the total expenditures,
$1,413,336.98.
  Proposed operations.-It is proposed to apply the funds unex-
pended on June 30, 1934, amounting to $53,692.28, as follows:
Accounts payable, June 30, 1934 ....                             $9, 561. 54
Maintenance operations with a seagoing hopper dredge for about 2
  months during the spring of 1935 __--                          44, 130. 74

             Total-                        __                             _          - _                                               53, 692. 28
     The additional sum of $50,000 can be profitably expended during
the fiscal year 1936 in maintenance operation of a seagoing hopper
dredge for about 2 months.
                                                        Cost and financial summary
Cost of new work to June 30, 1934 _____________                                                                              $1, 083, 504. 41
Cost of maintenance to June 30, 1934___ ______________________                                                                   334, 925. 89

      Total cost of permanent work to June 30, 1934 __ ______                                                                  1, 418, 430. 30
Value of plant, materials, etc., on hand June 30, 1934_________                                                                     4, 468. 22

             Net total cost to June 30, 1934_________________________                                                          1, 422, 898. 52
Minus accounts payable June 30, 1934________________________                                                                            9, 561. 54

     Net total expenditures___________________________                                                                         1, 413, 336. 98
Unexpended balance June 30, 1934___________________________                                                                        53, 692. 28
             Total amount appropriated to June 30, 1934____________                                                            1, 467, 029. 26

             Fiscal year ending June 30                                       1930           1931              1932        1933            1934


Cost of new work___________________                                                                            i-;--
                                                                                                         --------
Cost of maintenance______ ....                                           $29, 315. 17    $24, 466. 41     $8, 512. 55   $40, 300.06      $50, 791. 5&
Total expended----....-------------                                       24, 895. 09      19, 367. 42    14, 310. 69    38, 620.99       46, 299.73
Allotted---..................-------------------------42..............        845.   6      -- -- --
                                                                                           --            -1, 443. 67     49, 672. 65      85, 954. 60
         RIVERS     AND IIARBORS-PROVIDENCE,                                R. I.,            DISTRICT            61
Balance unexpended July 1, 1933______________       __________ $14, 037.41
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934___________________-___ $40, 000. 00
Amount allotted from War Department Appropriation
  Act approved July 14, 1932________________________ 26, 298. 10
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933_ _________________ ___      4, 517. 16
Amount allotted from War Department Appropriation
  Act approved Feb. 23, 1931______________________                                          15, 184. 74
                                                                                                           86, 000. 00
      Amount to be accounted for .                  .-..--                                         -      100, 037.41
Deductions on account of revocation of allotment --                                                _           45. 40

      Net amount to be accounted for                                __     --                              99, 992. 01
Gross amount expended-------------                                                          72, 810. 82
Less reimbursements collected_-----------------------                                       26, 511. 09
                                                                                                           46, 299. 73

      Balance unexpended June 30, 1934 ....-                                                               53, 692.28
Outstanding liabilities June 30, 1934----------------------------                                           9, 764.49

      Balance available      June 30, 1934              -            -__        ---                --      43, 927.79
Amount that can be profitably expended in fiscal year ending June
                               1- - - - - - - - - - - - - - - - -
  30, 1936, for maintenance                                         --                ---        __        50, 000. 00

             2. HARBOR OF REFUGE AT NANTUCKET,                                                MASS.

   Location.- On the north shore of Nantucket Island about 32
miles east-southeast from Vineyard Haven, Mass. (See U. S. Coast
and Geodetic Survey Chart No. 343.)
   Previous projects.-Adopted by the act of March 2, 1829. The
costs and expenditures under this project were $45,834.75, for new
work. For further details of the previous project, see page 1747,
Annual Report for 1915.
   Existing project.-This provides for a channel 15 feet deep at
mean low water, without prescribed width, through the bar at the
entrance and for converging jetties of riprap, 6,987 feet and 5,755
feet long on the east and west sides, respectively, of the entrance.
The mean range of the tide is 3.1 feet, and the maximum range due
to the combined effect of wind and other causes, is 5 feet or more.
   The estimate of cost for new work, revised in 1931, is $522,500,
exclusive of amounts expended under previous project. The latest
 (1928) approved estimate for annual cost of maintenance is $10,000.
   The project was authorized by the following river and harbor acts:
The act of June 14, 1880, provided for the west jetty (H. Doc.
No. 18, 46th Cong., 2d sess., and Annual Report for 1880, p. 423);
the act of August 5, 1886, provided for the east jetty (Annual
Report for 1885, p. 579); the acts of March 3, 1905, and March 2,
1907, provided for dredging in the channel between the jetties, the
estimate for which had not been included in the 1885 estimate. For
latest published map see annual report for 1916, page 1912.
   Local cooperation.-None required by law. The Commonwealth
of Massachusetts and local interests have expended for dredging
and rock removal nearly $59,000.
   Terminal facilities.-These consist of four piers affording about
3,000 feet of berthing space. Facilities are considered adequate for
present commerce.
  1 Exclusive of available funds.
62            REPORT       OF    CHIEF OF ENGINEERS,                                        U.   S.        ARMY,      1934


  Operations and results during fiscal year.-None.
  Condition at end of fiscal year.-The project is about 87 percent
completed. The channel has been dredged to project depth with a
width of 300 feet, increased at the inner end, and to 12 feet for an
additional width of 150 feet. The jetties have been built to varying
height and cross section with a view to controlling and regulating
scour between them. The west jetty is in fair condition; the east
jetty needs repairs. On June 30, 1934, the controlling depth at
mean low water in the channel was about 14 feet on the outer bar.
To complete the project, the west jetty is to be extended about 800
feet and the height of the east jetty raised if necessary. The costs
and expenditures under the existing project have been $456,482.25
for new work and $192,265.83 for maintenance, a total of $648,748.08.
  Proposed operations.-No funds available and no operations pro-
posed during the fiscal year 1935.
  The sum of $140,000 can be profitably expended during the fiscal
year 1936, as follows:
Maintenance:
    Repairs to the inner and the outer ends of the east jetty, by con-
      tract, July to October 1935, about 17,000 tons of riprap_-...... $85, 000
    Dredging in entrance channel, by contract, July to October 1935,
      about 125,000 cubic yards ---------------       --------          55, 000

       Total------------- --------------------------------------                                                                 140, 000
  The repairs will lessen the encroachment of sand into the channel
and give increased protection to commerce entering and leaving
the harbor during northeast storms. Dredging is required for the
removal of shoals on the outer bar and in the turn off Brant Point.
                                      Cost and financial surnmmary

Cost of new work to June 30, 1934----------------------------                                                              $502, 317.00
Cost of maintenance to June 30, 1934-                                                ----------------                       192, 265. 83

      Total cost of permanent work to June 30, 1934                                                                         694, 582. 83
Net total expenditures------------     -----    --------                                                     ------         694, 582. 83
Total amount appropriated to June 30, 1934                                                                                  694, 582. 83

            Fiscal year ending June 30                    1930                 1931                   1932          1933              1934


Cost of new work----------                            $29, 886. 55 -------------------------- --
Cost of maintenance --------------------               19, 552. 49 .       .----------.---------------                                   -

      Total cost- ------    --------- ---       - -    49, 439. 04 .....................................

Total expended _------------          -- ------ 61, 234.19 ---                         ..                           .------------  . . .
                                                                                                                               -------..

A llotted      _ .     .             .
                                  .
                             . -------..    .    .      6,109.33 _..            ..     ...---                 . .    . .    .   . .    . .   .



Amount (estimated) required to be appropriated for completion of
existing project                     -    -------------------------- $66, 00u
Amount that can be profitably expended in fiscal year ending June 30,
1936, for maintenance-___------------ ---------------------------    140, 000

                 3. CROSS RIP SHOALS, NANTUCKET SOUND, MASS.

  Location.-Nantucket Sound lies south of Cape Cod and north
of Nantucket and the eastern part of Marthas Vineyard Islands.
Cross Rip Shoals are a little southerly and easterly of the geographi-
              RIVERS AND HARBORS-PROVIDENCE,                                         R.    I.,   DISTRICT                  63
cal center of the sound. They are about 17 miles east from Vineyard
Haven on the island of Marthas Vineyard and about 15 miles north-
west from Nantucket Harbor. (See U. S. Coast and Geodetic Sur-
vey Chart No. 1209.)
  Existing project.-This provides for a channel 4,000 feet wide and
30 feet deep at mean low water between Half Moon Shoal and Cross
Rip Shoal, about 1.7 miles. The mean tidal range is about 2 feet
and the maximum range, due to the combined effect of wind and
other causes, is 3 feet or more.
   The estimate of cost for new work, made in 1928, was $27,000. The
latest (1928) approved estimate for annual cost of maintenance is
$4,000. The existing project was authorized by the River and Har-
bor Act of July 3, 1930 (H. Doc. No. 182, 70th Cong., 1st sess.). The
latest published map is in the project document.
   Terminal facilities.-None.
   Operations and results during fiscal year.-Maintenance dredging
by the U. S. dredge Marshall was in progress July 1 and 2, July 6,
and July 10 to 15, inclusive, 1933. During these periods a total of
59,264 cubic yards of sand was removed, mainly from the northeast-
ern shoal. The total cost and expenditure was $6,667.50, all for
maintenance.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1931 at a saving of $2,800 under the estimated cost. The
controlling depths on June 30, 1934, were 30 feet at the edge of the
western shoals and over 31 feet through the sailing course, and on the
eastern shoals 28 to 30 feet. The costs and expenditures have been
$24,200.13 for new work and $17,289.51 for maintenance, a total
of $41,489.64.
   Proposed operations.-It is proposed to apply the funds unex-
pended on June 30, 1934, amounting to $6,000, to maintenance opera-
tions with a seagoing hopper dredge for about 10 days in the spring
of 1935.
   The sum of $6,000 can be profitably expended during the spring
of 1936 in maintenance dredging by seagoing hopper dredge.
                                            Cost and financial summary
Cost of new work to June 30, 1934______________________________                                                $24, 200. 13
Cost of maintenance to June 30, 1934________________________                                                    17, 289. 51

          Total cost of permanent work to June 30, 1934______________                                             41, 489. 64

     Net total expenditures___________________________                                                             41, 489. 64
Unexpended balance June 30, 1934____________--__--__                                                                6, 000. 00
          Total amount appropriated to June 30, 1934 ______________                                               47, 489. 64


          Fiscal year ending June 30                       1930          1931             1932        1933             1934


Cost of new work . _______.
                      ...       .             _   ....
                                                  _______ ...          $5, 037. 69   $19, 162.44   --.......  ..     -..
                                                                                                                     . __-
                                                                                                                    --              -
                             ___--___. --
Cost of maintenance---------___                                 ____            ..                 $10, 622.01        $6, 667. 50
Total expended-------            ----------                                  6. 67    25, 500.64     9,314.83          6, 667. 50
Allotted9 15_-6---3---___--27,                                            000.00     _              14, 967. 20        5, 522. 44

         91536-ENG 1934-5
64      REPORT OF         CHIEF OF ENGINEERS,      U.   S.   ARMY,    1934

Balance unexpended July 1, 1933----------------------------- $7, 145. 06
Amount allotted from War Department Appropriation Act approved
  Apr. 26, 19346----------------------------------------------- , 000. 00

     Amount to be accounted for___________         ___-_______      13, 145. 06
Deductions on account of revocation of allotment ------------------     477. 56

      Net amount to be accounted for                                      2,667. 50
                                                                         1--------------------_____
Gross amount expended___ ______          _------                           6, 667. 50

      Balance unexpended June 30, 1934___                                       000. 00
                                                                             6,______________---_

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1-------------------------------                  6, 000. 00

        4. NEW BEDFORD AND FAIRHAVEN HARBOR,                         MASS.

   Location.-New Bedford Harbor is a tidal estuary on the western
side of Buzzards Bay, about 21 miles by water northwesterly from
the harbor at Vineyard Haven, Mass., and about 42 miles to the
Eastward of Point Judith Harbor, R. I. (See U. S. Coast and
Geodetic Survey Chart No. 252.)
   Previous projects.-Adopted by the acts of July 4, 1836, March 3,
1875, and August 11, 1888. The costs and expenditures under these
projects prior to the adoption of the existing project in 1907 were
$170,700 for new work. For further details see page 1748, Annual
Report of 1915.
   Existing project.-This provides for a channel 30 feet deep at
mean low water and 350 feet wide from deep water in Buzzards Bay
to a point just above the New Bedford-Fairhaven Bridge, nearly 5
miles, with increased widths for anchorage and maneuvering pur-
poses in the areas north of Palmers Island and above the bridge;
and a channel 100 feet wide and 18 feet deep at mean low water from
the 30-foot area north of Fish Island to Belleville, a distance of
about 2 miles, with a turning basin at the upper end 300 feet wide.
The mean range of the tide is 4 feet, and the maximum range, due to
the combined effect of wind and other causes, is 7 feet or more.
   The estimate of cost for new work, revised in 1930, is $1,384,000,
exclusive of amounts expended on previous projects. The latest
 (1980) approved estimate for annual cost of maintenance is $21,000.
   The existing project was authorized by the following river and
harbor acts: The act of July 25, 1912, provided for the 18-foot chan-
nel in the Acushnet River to Belleville (H. Doc. No. 442, 62d Cong.,
2d sess.); and the act of July 3, 1930, provided for the 30-foot chan-
nel and increased widths in the anchorage and maneuvering areas
 (H. Doc. No. 348, 71st Cong., 2d sess.) ; except that the width of the
channel was limited to 350 feet, the limit of cost being fixed at
$718,000. The latest published map is in the last-mentioned
document.
   Local cooperation.-The River and Harbor Act of July 25, 1912,
imposed the condition that local interests construct a new bridge at
Coggeshall Street with a draw opening of at least 100 feet and build
a substantial wharf upon the city property at Belleville, the name
given to the northern part of the city. These conditions have not
been met, and there is no present prospect of their being complied
with.
1Exclusive   of available funds.
                RIVERS AND HARBORS-PROVIDENCE,                                                 R. I.,       DISTRICT                  65
   Terminal facilities.-These consist of piers and wharves with a
total of about 18,500 feet of docking space. The facilities are con-
sidered adequate for the existing commerce. (For further details
see Port Series No. 18, Corps of Engineers.)
   Operations and results during fiscal year.-- Vork was confined to
maintenance survey and sweeping operations in the main channel,
using hired labor and Government plant. The costs were $17,321.80,
all for maintenance. The expenditures were $9,784.43.
   Condition at end of fiscal year.--The existing project is about 70
percent completed. Under previous authorizations a 25-foot chan-
nel along the New Bedford water front and an anchorage area east
of the channel have been completed. The entrance channel between
Butler Flats and the bridge, the channel through the bridge, and
channel and turning basin above the bridge, and the western maneu-
vering area have been dredged to 30 feet except for isolated ledge
and boulder areas. The controlling depths on June 30, 1934, were
26 feet in the entrance channel, nearly 26 feet in the channel through
the basin and the turning basin above the bridge, 30 feet in the west-
ern maneuvering area below the bridge except in the southwestern
portion north of Palmer Island, and in the Acushnet River about
23 feet to about 1,200 feet below the Coggeshall Street Bridge and
thence 7 feet to Belleville. The head of navigation is about 7 miles
north of the entrance, opposite Sconticut Point. To complete the
project requires the completion of the entrance channel, the deepen-
ing of the anchorage and maneuvering areas, and the dredging of
the 18-foot channel up to Belleville. The costs and expenditures have
been $965,108.71 for new work and $201,394.63 for maintenance, a
total of $1,166,503.34. The expenditures have been $1,166,503.34.
  Proposed operaticns.-No funds are available and no operations
are contemplated during the fiscal year 1935.
   The sum of $140,000 can be profitably expended during the fiscal
year 1936 in the removal of rock and boulders from the entrance
channel inside of Butler Flats Light and the operation of a sea-
going-hopper dredge outside of Butler Flats. The work is necessary
to secure the full benefit of the completed channel through the har-
bor. Under existing conditions, no maintenance work is necessary.
                                             Cost and financial summary

Cost of new work to June 30, 1934 -------------------                                                                         308. 71
                                                                                                                     $1, 135,135,
Cost of maintenance to June 30, 1934-------------------------                                                            201, 394. 63

           Total cost of permanent work to June 30, 1934__                                                  -          1, 337, 203. 34
Net total expenditures_                                                                --------------                 1, 337, 203. 34
Total amount appropriated to June 30, 1934                                                    _                       1, 337, 203. 34

           Fiscal year ending June 30                           1930            1931              1932            1933         1934


Cost of new work..           ----------------             ---------      $188, 115. 41 $104, 136. 58         $90, 942. 67 .---    --.....
Cost of m aintenance_ ._......        ........--            _-------- --        1.---------- 834. 30            .       67 $17, 321.80

       Total cost .....-------------------              ----------- 188,115.41               104, 970.88        90, 942. 67   17, 321.80
Total expended__...--....----       -----          -------- -    -     ---   137, 486.53     156, 074. 79       98, 005.01     9, 784.43

Allotted--...........---------------------__             -$2, 257. 42        282, 000.00      14, 694. 27    105, 301. 68      -645. 19
66        REPORT        OF CHIEF OF ENGINEERS,     U. S.   ARMY,       193 4

Balance unexpended July 1, 1933_------------------------------- $10, 429. 62
Amount allotted from War Department Appropriation Act approved
  Feb.    23,   1931_   ----------------                                       5, 500. 40

         Amount to be accounted for                                        15, 930. 02
                                                                           1-----------------
Deductions on account of revocation of allotment-----------                    6, 145. 59

      Net amount to be accounted for--                             -           9, 784. 43
Gross amount expended-----------------------------------------                 9, 784. 43

Amount (estimated) required to be appropriated for completion of
existing project --------------------------------------------    334, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1936, for new work-------------------------------------- 140, 000.00

                              5. FALL RIVER HARBOR, MASS.

   Location.-Situated at the mouth of Taunton River, on the east
side and at the head of Mount Hope Bay, which empties into the
ocean through Narragansett Bay and Sakonnet River. It is about
18 miles northerly from Newport Harbor. (See U. S. Coast and
Geodetic Survey Chart No. 353.)
   Prelious projects.-Adopted by the acts of June 23, 1874, March
3, 1899, June 13, 1902, and June 25, 1910. The total cost and ex-
penditures under these projects were $330,204.16 for new work and
$81,410.31 for maintenance, a total of $411,614.47. For further
details see page 1749 of Annual Report for 1915.
   Existing project.-This provides for a channel 30 feet deep at
mean low water and 400 feet wide through Mount Hope Bay and
Fall River Harbor, about 6.8 miles, with increased width opposite
the wharves below Slades Ferry Bridge, for the removal of the
lower end of Hog Island Shoal, and for the maintenance of the
25-foot anchorage, about 42 acres in area, west of the harbor chan-
nel. The mean tidal range is 4.9 feet and the maximum range, due
to the combined effect of wind and other causes, is 8 feet or more.
   The estimate of cost for new work, made in 1929, is $420,000, ex-
clusive of amounts expended on previous projects. The latest
 (1929) approved estimate for annual cost of maintenance is $11,000.
   The existing project was authorized by the River and Harbor
Act of July 3, 1930 (H. Doc. No. 158, 71st Cong., 2d sess.). The
latest published map is in the project document.
   Terminal facilities.--These consist of 17 piers having 12,000 feet
of docking space and wharves affording 7,000 feet additional dock-
ing space. Three of the piers have direct railroad connection. The
facilities are considered adequate for the commerce of the port.
 (For further details see Port Series No. 18, Corps of Engineers.)
   Operations and results duoing fiscal year.-Improvement dredging
at Hog Island Shoal, using the U. S. dredge W. L. Marshall, was
in progress July 3 and July 16 to August 7, inclusive, 1933. During
these periods a total of 64,288 cubic yards, bin measurement, of sand
and gravel was removed from the shoal at a cost of $11,907.53. A
survey was made of the dredged area in Fall River Harbor at a
cost of $1,346.24. The costs were $13,253.77, all applied to new
work. The expenditures were $11,460.98.
   Condition at end of fiscal year.-The project is about 90 percent
completed. Under previous authorization an anchorage has been
dredged opposite the wharves. The channel has been dredged to
               RIVERS AND         HARBORS-PROVIDENCE,                                  R. I.,         DISTRICT                  67

project dimensions up to Slades Ferry Bridge and the removal of
Hog Island Shoal about 52 percent completed. The controlling
depths at mean low water on June 30, 1934, were: Entrance channel
to Slades Ferry Bridge and through the bridge to the head, 30 feet;
anchorage area, 20 to 25 feet; Hog Island Shoal, 18 to 30 feet. To
complete the project requires the removal of the remainder of Hog
Island Shoal and the widening of the channel above the bridge. The
total costs and expenditures have been $378,472.86, for new work.
   Proposed operations.-There were no funds available at the close
of the year and no work is contemplated.
   The completion of the removal of Hog Island Shoal and the slight
widening of the channel above the bridges is not urgently necessary.
Maintenance work will not be required for 2 or 3 more years.
Therefore no funds can be profitably expended during the fiscal
year 1936.
                                  Cost and financial summary
Cost of new work to June 30, 1.934-----------------------------$708,     677. 02
Cost of maintenance to June 30, 1934--------------------------       81, 410. 31

      Total cost of permanent work to June 30, 1934------------                                                   790, 087. 33
Net total expenditures-------------------------------------                                                       790, 087. 33
Total amount appropriated to June 30, 1934-----------------_                                                      790, 087. 33

        Fiscal year ending June 30                        1930             1931           1932            1933           1934

Cost of new work ..........-----------------...    $139, 058. 74 $129,651. 07 $96, 509. 28 $13, 253. 77
                                        ------------
Cost of maintenance---------------------------------------------------------------            ----
Total expended-.--------------------------------                         80, 163. 37   190,085. 17      96, 763.34     11, 460.98
Allotted----      .............      ..---------------------
                                                     ....------------   253, 000. 00    25, 000. 00    129, 668. 22   -29, 195. 36



Balance unexpended July 1, 1933            -----------                                                            $40, 656. 34
Deductions on account of revocation of allotment -----------------                                                 29, 195. 36

      Net amount to be accounted for----------------------------11, 460. 98
Gross amount expended----------------------------- $13, 055. 65
Less reimbursements collected                              594. 67
                                                        1------------------------,
                                                                       11, 460. 98

Amount (estimated) required to be appropriated for completion of
existing project---------------------------------------------65,                                                       000. 00

                                  6. TAUNTON RIVER, MASS.

  Location.-Rises in Norfolk County, Mass., flows in a general
south by west direction about 44 miles, and empties into Mount
Hope Bay at Fall River. (See U. S. Geological Survey sheets
Taunton and Fall River.)
  Previous projects.-Adopted by acts of July 11, 1870, and June 14,
1880. The cost and expenditures under these projects prior to the
adoption of the existing project in 1930 were $171,497.93 for new
work and $32,831.26 for maintenance, a total of $204,329.19. For
further details see page 1748 of Annual Report for 1915.
  Existing project.-This provides for a channel 12 feet deep at
mean low water generally 100 feet wide up to a point about 2,800
68     REPORT   OF CHIEF OF ENGINEERS,      U.   S.   ARMY,   1934


feet below Weir Bridge; thence 80 feet wide for about 2,000 feet, and
thence 60 feet wide to the bridge.
   The mean tidal range is 4.9 feet at the mouth, 4.8 feet at Dighton,
and 4.2 feet at Weir Bridge. The maximum range, due to the com-
bined effects of wind and other causes, is 8 feet or more at the mouth
and at Dighton, and about 6 feet at the head of navigation.
   The estimate of cost for new work, made in 1930, is $780,000,
exclusive -of amount expended on previous projects. The latest
 (1930) approved estimate for annual cost of maintenance is $10.000,
including maintenance of the turning basin to be constructed by local
interests.
   The existing project was authorized by the River and Harbor Act
of July 3, 1930 (H. Doc. No. 403, 71st Cong., 2d sess.). The latest
published map is in the project document.
   Local cooperation.--The River and Harbor Act of July 3, 1930,
adopted the existing project subject to the provisions that local
interests shall provide, at their own expense, a suitable turning basin
near the head of navigation and furnish, without cost to the United
States, suitable bulkheaded areas for spoil disposal. Under date of
March 26, 1931, the Chief of Engineers accepted the assurances of
the Commonwealth of Massachusetts that the requirements would
be fully met.
   Terminal facilities.-These consist of wharves with docking space
of about 6,200 feet.
   The facilities are considered adequate for the existing commerce.
   Operations and results during fiscal year.-New work under con-
tract dated June 10, 1932, for dredging and rock removal, in prog-
ress at the beginning of the fiscal year, was completed October 6,
1933. During the period, 10,674 cubic yards of ledge rock and
17,421 cubic yards of overburden were removed and properly dis-
posed of at a cost of $70,475.19. Survey for the removal of boulders
and ledge rock below Dighton was made at a cost of $2,886.65. The
total amounts removed under the contract were 18,383 cubic yards
of ledge rock and 24,127 cubic yards of overburden. The costs were
$73,361.84, for new work. The expenditures were $60,300.97.
   Condition at end of fiscal year.-The existing project is about 23
percent completed. The channel above Dighton, dredged under
the previous project, has suffered some deterioration in depth and
width. Project dimensions except for minor deficiencies have been
secured up to the upper end of the rock area off Peters Point. On
June 30, 1934, the controlling depth up to the upper end of the rock
area at Peters Point was about 8 feet; above this point it is claimed
by those using the channel constantly that it cannot be used safely
by vessels drawing more than 9 feet intending to make the round
trip on one tide. To complete the project requires the deepening
of the channel from Peters Point to Taunton. The total costs and
expenditures under the existing project have been $179,456.28 for
new work.
  Proposed operations.-There were no funds available at the close
of the year and no work is contemplated during the fiscal years
1935 and 1936.
                RIVERS      AND HARBORS-PROVIDENCE,                                 R. I.,        DISTRICT                   69
                                      Cost and financial surnonary
Cost of new work to June 30, 1934----------------------------    $350, 954. 21
Cost of maintenance to June 30, 1934---------------------------32,     831. 26
             Total cost of permanent work to June 30, 1934---                                                  383, 785. 47
Net total expenditures                  ------------                                                           383, 785. 47
Total amount appropriated to June 30, 1934_                                              ----       --         383, 785.47


             Fiscal year ending June 30              1930             1931               1932         1933            1934

Cost of new work_----------------------------____               _________          $54, 437. 52    $51, 656. 92     $73, 361. 84
Cost of maintenance---
                    .-.               ------------ -        --------------------                   ---------       ----------
'Total   expended......--------------------------------            $2, 219. 69      67, 440. 49     49, 495. 13      60, 300. 97

.Allotted_      -----------------------------       $359. 99     110, 000. 00---     -             115, 446. 67     -45, 990.39



Balance unexpended July 1, 1933------                                                                        $106, 291.36
Deductions on account of revocation of allotment_____________                                                     45, 990. 39

             Net amount to be accounted for __                          ______________---                         60, 300. 97
Gross amount             expended_--________                                              $60, 305. 24
Less reimbursements                collected....---------------4.                                      27
                                                                                                                  60, 300. 97

Amount (estimated)               required to be appropriated for completion
     of existing        project _______                     ________---------------__                          487, 000. 00

                        7. PROVIDENCE RIVER AND HARBOR, R. I.

    Location.-Providence River is formed at the city of Providence
by the junction of the Pawtucket (Seekonk) River and two small
streams which rise in northern Rhode Island. It is tidal and flows
.southerly in a deep channel between broad flats about 8 miles, empty-
ing into Narragansett Bay. (See U. S. Coast and Geodetic Survey
Chart No. 278.)
    Previous projects.-Adopted by the acts of August 30, 1852, March
3, 1873, June 18, 1878, August 2, 1882, August 5, 1886, June 3, 1896,
June 13, 1902, March 2, 1907, and June 25, 1910. The cost and expen-
ditures under previous projects were $2,422,730.35 for new work
and $58,538.96 for maintenance, a total of $2,481,269.31. For further
,details see page 1750, Annual Report of 1915.
    Existing project.-This provides for an approach channel 30 feet
deep at mean low water and 600 feet wide through the river from the
deep water of Narragansett Bay opposite North Point, on Popa-
squash Neck, up to Fields Point, 8.8 miles, and thence with the same
depth through the harbor, from 1,300 feet wide to 1,800 feet wide,
reducing to 800 feet at Fox Point, and limited on the east and west
sides by the harbor lines, excepting the area formerly known as
" Green Jacket Shoal ",about 1.6 miles to Fox Point. The mean tidal
range is about 4.7 feet and the maximum range, due to the combined
effect of wind and other causes, is 8 feet or more.
    The estimate of cost for new work, revised in 1928, was $1,350,000,
exclusive of amounts expended on previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $35,000.
70            REPORT     OF CHIEF OF ENGINEERS,                         U.    S. ARMY,           1934

  The existing project was authorized by the River and Harbor Act
of March 4, 1913 (H. Doc. No. 1369, 62d Cong., 3d sess.). The latest
published map is in the Annual Report for 1915, page 2068.
  Local cooperation.-Fully complied with.
   Terminal facilities.-The facilities are considered adequate for
existing commerce. (For further details see Port Series No. 18,
Corps of Engineers.)
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1932 at a saving of $11,318 under the estimated cost. The
controlling depths at mean low water are: Approach channel up to
Fields Point, 30 feet (nearly full width) as determined in 1927, and
in the harbor area over 30 feet except at the edges; Green Jacket
Shoal (not included in the existing project), 17 to 24 feet, both as
determined in 1932. The total costs under the existing project have
been $1,338,681.21 for new work and $472,091.92 for maintenance, a
total of $1,810,773.13, and the expenditures $1,819,521.47.
   Proposed operations.-It is proposed to apply the funds unex-
pended on June 30, 1934, amounting to $6,748.77, to maintenance
contingencies throughout the year.
   No additional funds can be profitably expended during the fiscal
year 1936, as the channel and harbor are believed to be in satisfactory
condition to serve existing traffic through that period.
                                   Cost and financial summary
Cost of new work to June 30, 1934___________________________                                     $3, 761, 411. 56
Cost of maintenance to June 30, 1934_____________________                                            530, 630. 88

      Total cost of permanent work to June 30', 1934____________                                   4, 292, 042. 44
Value of plant, materials, etc., on hand June 30, 1934_                                                 8, 136. 64

      Net total cost to June 30, 1934__ _______________________                                    4, 300, 179. 08
Plus accounts receivable June 301, 1934_______________________                                             826. 19

      Gross total costs to June 30, 1934______________________                                     4, 301, 005. 27
Minus accounts payable June 30, 1934             __                                                        214. 49

      Net total expenditures_--   ---------                                                        4, 300, 790. 78
Unexpended balance June 30, 1934______________________                                                  6, 748. 77

         Total amount appropriated to June 30, 1934___________                                     4, 307, 539. 55

        Fiscal year ending June 30                1930           1931           1932          1933              1934


Cost of new work_______-
                 ..      ____      -_____        $300.00     - --            $32, 102. 68   $2, 653. 83 -..........
Cost of maintenance------------_              ......        $169, 706. 92     22, 250. 24        195. 59-
                  ------------------------
      Total cost ....         .....       .       300. 00    169, 706. 92     54, 352.92     2, 849. 42
Total expended-..........................       3,677. 62 146, 032.79 )54, 047.98           13, 701.26           - 81. 65
Allotted --     --..........
                  ___  --.........            258, 000.00-----------0              00.00    -5,721.92            -597. 50



Balance unexpended July 1, 1933__ __        _____   __---------------- $7, 164. 62
Deductions on account of revocation of allotment _________--------597. 50
         Net amount to be accounted for_______________                                       _              6,567. 12
         RIVERS AND IIARBORS-PROVIDENCE,             R. I.,     DISTRICT              71
Gross amount expended___                                      $11, 809.60
Less reimbursements collected _________________---   __        11, 991. 25
                                                                             -$181.   65
      Balance unexpended June 30, 1934________________________                6,748. 77
Outstanding liabilities June 30, 1934___                                      1, 013. 01
      Balance available June 30, 1934_________________________                5, 735. 76
Accounts receivable June 30, 1934 ___________________-__ -- __                   826. 19
      Unobligated balance available June 30, 1934___ ___________              6, 561. 95

                8. PAWTUCKET (SEEKONK) RIVER, R. I.

   Location.-This river rises in the vicinity of Worcester, Mass.,
and flows in a general southeasterly direction for about 52 miles,
emptying into Providence Harbor at Providence. (See U. S. Coast
and Geodetic Survey Chart No. 278.)
   Previous projects.-Adopted by the acts of March 2, 1867, July 5,
1884, and March 3, 1899. The cost and expenditures under this
project, prior to operations under the existing project in 1906, were
'$334,425.32 for new work. For further details see page 1749 of
Annual Report for 1915.
   Existing project.-This provides for a channel 16 to 18 feet deep
at mean low water and 150 to 230 feet wide from Red Bridge up to
the ledge rock between the wharves at Pawtucket, 3.2 miles; thence
with same depths 100 to 60 feet wide through the ledge to Division
Street Bridge, 0.2 mile. The mean tidal range is about 4.7 feet at
the mouth of the river and about 5 feet at Pawtucket, and the maxi-
mum ranges due to the combined effect of wind and other causes are
about 8 and 7 feet, respectively.
   The estimate of cost for new work, revised in 1922, was $423,035,
exclusive of amounts expended on previous projects; but including
the expenditure of funds contributed by the State of Rhode Island
to the amount of $67,792. The latest (1928) approved estimate for
annual c'ost of maintenance is $10,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1905, provided for the 16-foot
channel from Red Bridge, in Providence, to Division Street Bridge
in Pawtucket (H. Doc. No. 113, 56th Cong., 1st sess.); the act of
March 3, 1909, authorized the expenditure of any balance remaining
after the completion of work then under contract in deepening the
channel to 18 feet at mean low water and increasing the width of
such places as would best serve the interests of navigation; the act
of March 2, 1919, provided for widening the channel, except through
the ledge at Pawtucket, to 150 feet (H. Doc. No. 1283, 64th Cong.,
1st sess.); and the act of September 22, 1922, provided for the pres-
,ent width of channel through the ledge at Pawtucket (H. Doc. No.
654, 66th Cong., 2d sess.). The latest published map is in House
Document No. 1283, Sixty-fourth Congress, first session.
   Local cooperation.-Fully complied with.
    Terminal facilities.-Including the five terminals at and near
Phillipsdale, the facilities cover about 5,260 feet of docking space, of
which 700 feet is owned by the State of Rhode Island and 4,560 feet
72          REPORT OF CHIEF OF ENGINEERS,                                   U.       S.     ARMY,            1934


owned and used by private owners. The facilities are considered
adequate for the existing commerce.
   Operations and results during fiscal year.-Maintenance dredging
under contract between Walkers Point and Pawtucket was begun on
June 2, 1934, and was in progress at the close of the year. During
this period a total of 60,931 cubic yards of mud was removed from
the channel reach above Phillipsdale. The costs were $24,902.85,
applied to maintenance. The expenditures were $16,499.10.
   Condition at end of fiscal year.-The project was completed in
1927 at a saving of $17,454 under the estimated cost. The controlling
depth at mean low water as determined in 1934 was 16 feet to
Phillipsdale; thence 141/ feet to the Pawtucket wharves; and thence
about 13 feet to Division Street. The head of navigation is at the
head of Pawtucket Falls, about 5.2 miles above the mouth of the
river. The costs under the existing project have been $337,788.85
for new work and $202,869.45 for maintenance, a total of $540,658.30,
and the total expenditures $532,254.55. In addition, the sum of
$67,792 was expended from contributed funds.
   Proposed operations.-It is proposed to apply the funds unex-
pended on June 30, 1934, amounting to $105,492.23, as follows:
Accounts payable, June 30, 1934_ __                 -__-  _  ________                                                   $8, 403. 75
Maintenance dredging under contract in progress, to be completed
in October 1934    ----------------------------------------        _                                                   97, 088. 48
        Total                                    __
                                       ------------------------------                                               105, 492.23
  No additional funds can be profitably expended during the fiscal
year 1936, as the completion of the above work will leave the channel
in satisfactory condition for several years.
                                    Cost and financial summary

                                 -------------------------
Cost of new work to June 30, 1934_                                                                                 $672, 214. 17
Cost of maintenance to June 30, 1934----                                                                            202, 869. 45
      Total cost of permanent work to June 30, 1934___                                                              875, 083. 62
Minus accounts payable June 30, 1934    --------------------                                                          8,403. 75

      Net total expenditures -------------------------------                                                        866, 679. 87
Unexpended balance June 30, 1934___---------------------                                                            105, 492. 23

        Total amount appropriated to June 30, 1934--------------972, 172. 10


        Fiscal year ending June 30                    1930           1931               1932                1933            1934


Cost ofnew work_------------
Cost ofmaintenance---------------                             - --                   - ----                   -           $24, 902. 85
Total expended-----
               ..............          ..---------------.$2. 03                  -          --         --          --      16, 499. 10

Allotted--........... ......              -     -9,    032. 72              ------------------------                      121,991. 33
           RIVERS AND         HARBORS-PROVIDENCE,                R. I.,     DISTRICT               73
Amount allotted from War Department Appropriation Act approved
  Sept. 22, 1922      -----                                                                   $994. 77
Amount allotted from War Department Appropriation Act approved
  July 14, 1932__-            ---                          ---                             110, 702.94
Amount allotted from War Department Appropriation Act approved
Feb. 28, 1929__                                                                             1,746.89
Amount allotted from War Department Appropriation Act approved
  May 28, 1930                                                     __ -                _     4,478. 79
Amount allotted from War Department Appropriation Act approved
Feb. 23, 1931--------------------
                      __       ______     _                                                  4, 076. 61

     Amount to be accounted for______                                                      122, 000. 00
Deductions on account of revocation of allotment------                                            8. 67

      Net amount to be accounted for_ _-- --                                    ----       121, 991. 33
Gross amount expended_______________________-                                               16, 499. 10

       Balance unexpended June 30, 1934_
                                       ------------------------                            105, 492.23
Outstanding liabilities June 30, 1934_ _--__ ____-                        $8, 403. 75
Amount covered by uncompleted contracts__     --------------              95, 931. 09
                                                                                    -       04,.334. 84

       Balance available June 30, 1934_------------------------_                             1,157. 39

              9. HARBOR OF REFUGE AT BLOCK ISLAND, R. I.

   Location.--Located on the east side of Block Island, near the
south end of the inner curve of the shore line. It is 13 miles south-
southwest from Point Judith Harbor and about 25 miles southeast-
erly from Stonington Harbor, Conn. (See U. S. Coast and Geodetic
Survey Chart No. 276.)
   Existing project.-This provides for a rubble-mound breakwater
extending northerly about 1,950 feet from the shore; a similar
breakwater about 1,100 feet long, extending northerly and easterly,
enclosing, with the main breakwater, an area about 800 feet square
designated as the inner harbor; masonry walls in the southeastern
corner of the inner harbor enclosing an area nearly 300 feet
square designated as the basin; and for dredging to a depth of 15 feet
at mean low water the outer protected area and about 67 percent of
the inner harbor and of the basin. The mean tidal range is about
3 feet, and the maximum range, due to the combined effects of wind
and other causes, is 7 feet or more.
   The estimate of cost for new work, revised in 1928, is $615,300.
The latest (1928) approved estimate for annual cost of maintenance
is $3,000.
   The existing project was authorized by the following river and
harbor acts: The act of July 11, 1870, provided for the main break-
water (Annual Report for 1868, p. 785, and S. Misc. Doc. No. 81,
40th Cong., 2d sess.); the act of August 5, 1886, provided for the
breakwater enclosing the inner harbor (S. Doc. No. 27, 48th Cong.,
2d sess., and Annual Report for 1885, p. 610); the act of June 3,
1896, provided for raising the crest of the main breakwater and
making it sand tight (H. Doc. No. 83, 54th Cong., 1st sess.), the act
of July 25, 1912, made final provision for the basin walls and for the
present dimensions of the dredged areas (H. Doc. No. 828, 60th
Cong., 1st sess.). The latest published map is in the last-mentioned
document.
74      REPORT OF CHIEF        OF ENGINEERS, U.           S. ARMY,   1934

   Reconmmended modifications of project.-It is recommended that
this project be modified by eliminating the dredging of the outer
harbor west of the entrance channel (H. Doc. No. 467, 69th Cong.,
1st sess.).
   Terminal facilities.-These consist of two wharves with a total
of 680 feet of docking space, which is adequate for present needs.
   Operations and results during fiscal year.-Maintenance dredg-
ing under contract was commenced on May 22, 1934, and was in
progress at the end of the fiscal year. During the period 9,927
cubic yards of mud were removed from the channel through the
inner harbor. The costs were $4,332.37. Under a contract for main-
tenance, repairs to the main breakwater were commenced June 18
and completed June 26, 1934. About 640 linear feet of breakwater
were tightened against the passage of sand by the use of 803.66
long tons of broken stone. The costs were $3,898.32. The total cost
was $8,230.69, for maintenance, and the total expenditures were
$8,405.46.
   Condition at end of fiscal year.-The existing project is about 94
percent completed. The breakwater and harbor walls were com-
pleted in 1916. The inner harbor and basin have been dredged to
proper dimensions and a channel 60 to 130 feet wide and 15 feet deep
has been dredged from deep water outside of the harbor up to the
town wharf. The controlling depth at mean low water on June 30,
1934, in the channel through the inner and outer harbors to the
head of the basin was 15 feet except at the edges. The breakwaters
and basin walls are in fair condition. To complete the project
requires the deepening of the outer protected area adjacent to the
dredged channel. The costs have been $576,856.47 for new work
and $126,014.43 for maintenance, a total of $702,870.90, and the
expenditures a total of $701,599.52.
  Proposed operations.-It is proposed to apply the funds unex-
pended on June 30, 1934, amounting to $2,932.98, as follows:
Accounts payable, June 30, 1934    ____________--------------$1,              271.38
Maintenance dredging under contract in progress, to be completed
in July 1934-----------______-----------------__                           1,661.60

      Total ____--   _-----_                                                2, 932.98
   The channel is being restored and the breakwaters are in good
condition. There is no present necessity for dredging the outer
area. Therefore no funds can be profitably expended during the
fiscal year 1936.
                          Cost and financial summ ary

Cost of new work to June 30, 1934--------   ----------------- $576, 856. 47
Cost of maintenance to June 30, 1934------------------------126, 014. 43
      Total cost of permanent work to June 30, 1934----------_ 702, 870. 90
Minus accounts payable June 30, 1934-------------------------    1,271. 38

     Net total expenditures----------------------------------  701, 599. 52
Unexpended balance June 30, 1934 -----------------------------   2, 932. 98

      Total amount appropriated to June 30, 1934-------------704, 532. 50
               RIVERS AND HARBORS-PROVIDENCE,                            R.     I.,     DISTRICT                  75

          Fiscal year ending June 30        I   1930         1931         1932              1933           1934


C ostofnew w ork ... . . . . . . -    . . . . .- -. . . . . -.... .          . ..-
                                                                          - -..
Cost of maintenance---------------------------- $11, 793. 65 $5,799.81 $13,590.30  $8,230.69
Total expended..------------------------        $333. 50   11, 498. 21        773. 85     17, 170. 36      8, 405.46
Allotted-----------------_____________15,                     700.00-                     11, 923.79       9, 741. 97



Balance unexpended July 1, 1933-------------------------------- $1, 596.47
Amount allotted from War Department Appropriation Act approved
  July 14, 1932 _      _-------------------                      9,900. 00
      Amount to be accounted for-__                                                                     11,496.47
Deductions on account of revocation of allotment---------------                                            158.03
      Net amount to be accounted for----------------------------                                        11, 338. 44
Gross amount expended---------------------------__------                                                 8,405. 46
      Balance unexpended June 30, 1934------------------__                                               2,932. 98
Outstanding liabilities June 30, 1934-.....           $1, 271.38
Amount covered by uncompleted contracts_      ___      1,383. 50
                                                                                                         2, 654. 88

      Balance available June 30, 1934-__                      _      278. 10
Amount (estimated) required to be appropriated for completion of
existing project 1     -----------------------------------      38, 500.00
                                 10. NEW LONDON HARBOR, CONN.

  Location.-This harbor is on the north shore of Long Island
Sound, at its eastern end, and about 14 miles east of the mouth of
the Connecticut River. (See U. S. Coast and Geodetic Survey Chart
No. 293.)
    Previous projects.-Adopted by acts of June 14, 1880, March 3,
1881, and July 13, 1892. The cost and expenditures, prior to the
adoption of the existing project in 1902, were $19,800 applied to new
work in New London Harbor and $21,000 applied to new work in
Shaws Cove, a total of $40,800. For further details see page 1753
of Annual Report for 1915.
  Existing project.-This provides for an entrance channel 600 feet
wide, 33 feet deep, and about 31/2 miles long from Long Island Sound
to the natural deep water in the upper harbor; a channel 400 feet
or more in width, 23 feet deep, and about 6,000 feet long skirting
the water front of the city; and for dredging Shaws Cove to a depth
of 15 feet. The plane of reference is mean low water, the mean tidal
range being 2.4 feet. The maximum tidal range, due to the com-
bined effects of wind and other causes, is 7 feet or more. The esti-
mate of cost for new work, revised in 1928, was $543,000, exclusive of
amounts expended on previous projects. The latest (1914) approved
estimate for annual cost of maintenance is $3,300.
  The existing project was authorized by the following river and
harbor acts: The act of June 13, 1902, provided for the water-front
channel (H. Doc. No. 392, 56th Cong., 1st sess.) ; the act of June 25,
1910, provided for dredging in Shaws Cove (H. Doc. No. 329, 60th
Cong., 1st sess.) ; the act of July 27, 1916, provided for the entrance
   1Exclusive       of available funds.
76            REPORT           OF CHIEF                       OF ENGINEERS, U.                  S. ARMY,          1934


channel (H. Doc. No. 613, 63d Cong., 2d sess.). The latest published
map is in the last-mentioned dog ument.
  Local cooperation.-Fully complied with.
  Terminal facilities.-The total developed shore frontage is nearly
3 miles. The total length of berthing space available is about 19,755
feet. The facilities are considered adequate for the existing com-
merce. (For further details see Port Series No. 18, Corps of
Engineers.)
   Operations and results during fiscal year.-Dredging in Shaws
Cove by contract for maintenance was commenced December 4,
1933, and completed February 22, 1934. A net total of 19,023 cubic
yards of mud, sand, and gravel, and 5.813 cubic yards of boulders
were removed, completing the maintenance work. The costs were
$8,392.45, for maintenance. The expenditures were $7,716.17.
  Condition at end of fiscal year.--The existing project was com-
pleted in 1933. The controlling depths at mean low water are: Main
channel from entrance to State Terminal, 33 feet as determined in
1933; channel along the water front, except in Winthrops Cove,
24 feet, ascertained in 1930; Shaws Cove, 16 feet, ascertained in
1934. The costs have been $558,390.18 for new work and $49,584.26
for maintenance, a total of $607,974.44, and the total expenditures
$607,298.25.
  Proposed operations.-It is proposed to apply the funds unex-
pended June 30, 1934, amounting to $4,226.68, as follows:
Accounts payable, June 30, 1934 -----------------------                                                                       $676. 19
Balance remaining---------------------------------------------                                                              3, 550.49
          Total            ------------------------------------------------                                                 4, 226. 68
   The harbor channels are in condition to meet the needs of existing
traffic for several years. Therefore no funds can be profitably
expended during the fiscal year 1936.
                                                  Cost and financial sumnnary

Cost of new work to June 30, 1934--------------------------- $599, 190. 18
Cost of maintenance to June 30, 1934------------------------- - 49, 584. 26
      Total cost of permanent work to June 30, 1934-------------- 648, 774. 44
Minus accounts payable June 30, 1934---------------------------        676. 19

      Net total expenditures ___                                                                                        648, 098. 25
Unexpended balance June 30, 1934-----------------------------                                                             4, 22:6. 68

          Total amount appropriated to June 30, 1934-                                                                   652, 324. 93

          Fiscal year ending June 30                                     1930       1931              1932      1933           1934


Cost of new work ...-- -               -      -        -           ---                         -----------   $90, 902. 92 . -     ------
Cost of maintenance                 ----------------              $20, 591. 01       $10, 56          -       11, 677. 59     $8, 392. 45
       Total cost- ------------------------                        20, 591. 01        10. 56                 102, 580. 51      8,392. 45
Total expended-----------------------20, 570. 46                                      10. 56   ----          102, 580. 51      7, 716. 17

Allotted .-----------------------                  -       .- .     4, 836. 49   -4, 000. 00     --------.
                                                                                                        102, 345. 69          11, 942. 85
         RIVERS AND HARBORS-PROVIDENCE,               R. I.1 DISTRICT          77
Amount allotted from War Department Appropriation Act approved
  Mar. 4, 1933_             ___-___                                  $12, 000. 00
Deductions on account of revocation of allotment___     ----               57. 15

      Net amount to be accounted for ------------------------ _         11, 942. 85
Gross amount expended __                                $7, 716.26
Less reimbursements collected------------------------.          09
                                                                         7, 716. 17

      Balance unexpended June 30, 1934--------------------               4, 226. 68
Outstanding liabilities June 30, 1934---------------------------            676. 19

      Balance available June 30, 1934----------------------------        3, 550. 49

                        11. THAMES RIVER, CONN.

   Location.-This is a tidal estuary varying in width from about
400 feet to three-fourths of a mile, and extending from the junction
of the Yantic and Shetucket Rivers at Norwich, Conn., 15 miles
southerly to Long Island Sound at New London. (See U. S. Coast
and Geodetic Survey Chart No. 359.)
   Previous projects.-Adopted by the River and Harbor Acts of
July 4, 1836, and March 3, 1879. The cost and expenditures prior to
operations under the existing project in 1882, were $184,943.46, of
which $148,347.59 was for new work and $36,595.87 was for main-
tenance. For further details see page 1754 of Annual Report for
1915.
   Existing project.-This provides for a channel 25 feet deep and
250 feet wide to the upper end of Bartletts Crossover and thence
200 feet wide to Allyns Point; thence 18 feet deep and 200 feet wide
to Norwich; the construction of five training walls, with their tops
at mean high water, located, respectively, at Mohegan, pile and
stone, about 2,750 feet long; Trading Cove, riprap, 2,325 feet long;
Long Rock, riprap, about 2,750 feet long; Rolling Mill, riprap, about
3,300 feet long; and Norwich, riprap, 1,050 feet long; and the re-
moval of obstructions in the Shetucket River at Norwich. The plan:
of reference is mean low water, the mean tidal range being 2.4 feet
at New London, 2.7 feet at Allyns Point, and 2.5 feet at Norwich.
The maximum range, due to the combined effect of wind and other
causes, is 7 feet or more.
   The estimate of cost for new work, revised in 1930, was $818,200,
exclusive of amounts expended on previous projects. The latest
 (1930) approved estimate for annual cost of maintenance is $24,300.
   The existing project was authorized by the following river and
harbor acts: The act of August 2, 1882, provided for the training
walls and for the present channel widths above Allyns Point (An-
nual Report for 1882, p. 606); the act of June 25, 1910, provided
for removal of obstructions in the Shetucket River (H. Doc. No. 397,
61st Cong., 2d sess.) ; the act of January 21, 1927, provided for the
present channel depth above Allyns Point (H. Doc. No. 107, 69th
Cong., 1st sess.) ; and the act of July 3, 1930, provided for the
present channel dimensions up to Allyns Point (River and Harbor
Committee Doc. No. 14, 71st Cong., 2d sess.). The latest published
maps are in the above-mentioned documents.
   Terminal facilities.-Wharves along the river and at Norwich
are mainly of the bulkhead type, both with and without pile aprons.
The facilities are considered adequate for the existing commerce.
78          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                               1934

   Operationsand results during fiscal year.-Improvement dredging
under contract below Allyns Point, in progress at the beginning of
the fiscal year, was completed July 13, 1933. During this period,
90,135 cubic yards of material were removed completing the channel
up to Allyns Point. The total yardage removed under the contract
was 541,463. Maintenance dredging under contract was commenced
June 19, 1934, and was in progress at the close of the year. A total
of 62,640 cubic yards was removed from the channel north of Allyns
Point. The costs were $11,540.41 for new work and $28,279.55 for
maintenance, a total of $39,819.96. The expenditures were $36,913.71.
   Condition at end of fiscal year.--The existing project was com-
pleted in 1933 at a saving of $129,924.04 under the estimated cost.
The training walls were completed in 1906, except the upper end
of the Rolling Mill Dike, which is replaced by adjacent shore im-
provements. The training walls are in fair condition. The con-
trolling depth at mean low water on June 30, 1934, was 25 feet to
Allyns Point, thence about 171/2 feet to Norwich, and thence 12 feet
on the Shetucket River up to the town wharf. The costs under the
project have been $688,275.96 for new work and $234,674.68 for
maintenance, a total of $922,950.64, and the total expenditures
$906,911.87.
   Proposed operations.-It is proposed to apply the funds unex-
pended on June 30, 1934, amounting to $216,750.20, as follows:
Accounts payable June 30, 1934--                                $16, 038.77
Maintenance dredging above Allyns Point under contract in prog-
  ress to be completed in November 1934___                                                              200, 711. 43

        Total----------_                                                                        _       216, 750.20
  No additional funds can be profitably expended during the fiscal
year 1936, as the completion of the above work will leave the river
channels in good condition.
                                  Cost and financial summary
Cost of new work to June 30, 1934----------------------                                                $836, 623. 55
Cost of maintenance to June 30, 1934------                                                  _           2171, 270. 55

     Total cost of permanent work to June 30, 1934---------- 1, 107, 894. 10
Minus accounts payable June 30, 1934----------------------       16, 038. 77

        Net total expenditures--                                  -              -                   1, 091, 855. 33
Unexpended balance June 30, 1934                 ---                             -                      216, 750. 20

        Total amount appropriated to June 30, 1934---                                 --             1, 308, 605. 53


        Fiscal year ending June 30              1930           1931            1932             1933          1934


Cost of new work____________ _____________ $148, 939. 08    $88, 170. 33 -$7, 628. 00      $49, 456. 28     $11, 540. 41
Cost of maintenance_______________________   16, 104. 57     42, 987. 15       - -         -_                28, 279. 55
      Total cost___---------    -___-___-_   165, 043. 65   131, 157. 48   -7, 628. 00      49, 456. 28      39, 819.,96
Total expended_____ ______________________   177, 865. 02   145, 473. 72                    36, 323. 76      36, 913. 71
Allotted_______________________ _________     90, 000. 00    23, 000. 00   -12, 782. 14     67, 801. 22     222, 186. 45
         RIVERS AND HARBORS-PROVIDENCE,               R. I.,   DISTRICT         79
Balance unexpended July 1, 1933                                $31, 477. 46
Amount allotted from War Department Appropriation Act approved
July 14, 1932----------------------------------------------229, 000. 00,
     Amount to be accounted for-----------------------------          260,477.46
Deductions on account of revocation of allotment ------------ ___       6, 813. 55,

      Net amount to be accounted for--------------------------253, 663. 91
Gross amount expended ---------------------------------------- 36, 913. 71'

      Balance unexpended June 30, 1934---------------------- 216,,750.20)
Outstanding liabilities June 30, 1934--------------- $16, 038. 77
Amount covered by uncompleted contracts------------- 197, 097. 74
                                                     --------     213, 136. 51

      Balance available June 30, 1934_-----------__               _       3, 613. 69

         12. CONNECTICUT RIVER BELOW HARTFORD, CONN.

   Location.-This river has its source in Connecticut Lake, in north-
ern New Hampshire, flows southerly 380 miles, and empties into
Long Island Sound at Saybrook, Conn., 14 miles west of New
London. Hartford, now the head of commercial navigation, is 51.9)
miles by channel from the mouth. A dam at Holyoke, 34 miles above
Hartford, completely interrupts navigation. (See U. S. Coast and
Geodetic Survey Charts nos. 215, 254, 255, and 256.)
   Previous projects.-Adopted by the River and Harbor Acts of
July 4, 1836, and July 11, 1870. The cost and expenditures, prior
to operations under the existing project in 1911, were $287,374.29,
for new work and $366,348.47 for maintenance, a total of $653,722.76..
For further details see page 1754 of Annual Report for 1915.
   Existing project.-This provides for a channel 300 feet wide, 15
feet deep at mean low water, and about 0.6 mile long, across the bar
at the mouth, and thence 100 feet wide and 12 feet deep at mean low
water (2 feet on the Hartford gage) for 51.3 miles to Hartford; the
channels to be obtained by dredging and the construction of dikes,
training walls, revetments, and accessory works; for two riprap
jetties at the mouth of the river, the tops to be 5 feet above high
water and 6 feet wide, the easterly one about 2,300 feet and the
westerly about 2,250 feet in length; and for a training dike about
3,700 feet long at Hartford. The mean tidal range is 3.4 feet at the
mouth and, on low water, 1.2 feet at Hartford. The maximum tidal
range at the mouth, due to wind or other causes, is 8 feet or more. At.
Hartford the usual rise due to spring freshets is between 16 and 24
feet above mean low water. The maximum recorded freshet at Hart-
ford (May 1854) was 27.8 feet above mean low water. Below Hart-
ford the height of the crest of the freshet decreases rapidly.
   The estimate of cost for new work, revised in 1917, is $388,000,
exclusive of amounts expended on previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $20,000,
   The existing project was authorized by the following river and
harbor acts: The act of June 10, 1872, provided for the jetties at the
mouth (present dimensions approved by the Chief of Engineers
Dec. 22, 1887); the act of March 3, 1881, provided for the Hart-
ford Dike (present dimensions authorized by the Chief of Engineers
      91536-ENG 1934--6
80     REPORT OF CHIEF OF ENGINEERS,        U.   S. ARMY,   1934


in 1889); the act of February 27, 1911, provided for the present
channel dimensions (H. Doc. No. 1294, 61st Cong., 3d sess.) ; and the
act of March 2, 1919, made final provisions for the dikes, training
walls, revetments, and accessory works (H. Doc. No. 132, 65th Cong.,
1st sess.). For latest published maps see Annual Report for 1913,
page 1602, the last-mentioned document, and House Document No.
49, Seventy-third Congress, first session.
   Recommended modifioaltions of project.-Under date of December
21, 1932, the Chief of Engineers recommended modification of the
existing project so as to provide for a channel 15 feet deep at mean
low water, 300 feet wide from the mouth to the Lyme railroad bridge,
thence generally 150 feet wide to Hartford, to be obtained by dredg-
ing and the construction of additional dikes, training walls, and
revetments at an estimated cost of $530,000 for new work, with main-
tenance estimated at $33,000 annually in addition to that now re-
quired, subject to certain conditions of local cooperation. (H. Doc.
No. 49, 73d Cong., 1st sess.)
   Terminal facilities.-There are two or three wharves at each of
the river towns, one or more in each town being open to public use.
At Hartford and at Middletown there is approximately one-half
mile of wharf frontage along the west bank of the river. The facili-
ties are considered adequate for existing commerce.
   Operations and results during fiscal year.-Under a contract for
maintenance, in progress at the beginning of the fiscal year and com-
pleted on November 3, 1933, the channels through the river bars were
restored to project depth and widths of 50 to 75 feet. During this
period the total length of channel thus dredged was about 12,460
feet and a total of 48,607 cubic yards was removed. The cost of
this dredging was $14,161.38, all applied to maintenance. The total
net yardage removed under the contract was 55,326. Contract dredg-
ing for maintenance commenced on May 31, 1934, in progress at
the close of the fiscal year, removed 17,734 cubic yards of material
from Pistol Point and Dividend Bars at a cost of $6,717.39, applied
to maintenance. Using hired labor and plant, minor repairs were
made to the revetments at Cys Hollow, Naubuc, Press Barn, Crow
Point, Glastonbury, Two Piers, and Gildersleeve, using 660.26 tons
of stone; and three snags were removed, two at Hartford and one at
Clay Banks Bar. The costs for this work were $1,861, applied to
maintenance. The total costs were $22,739.77, for maintenance, and
the total expenditures were $21,997.22.
   Condition at end of fiscal year.-The existing project is over 99 per-
cent completed. The channel from the mouth to Hartford was com-
pleted in 1914. The Saybrook jetties and training walls at Hartford,
Clay Banks, and Sears Shoal were completed in 1915. The stone
dikes and timber spurs at Pistol Point, Glastonbury, Press Barn,
Naubuc, Cys Hollow, and Clay Banks were completed in 1927. The
Clay Banks, Cys Hollow, Naubuc, Press Barn, Glastonbury (includ-
ing Two Piers), and Gildersleeve Island Reaches have been revetted.
   The jetties, training walls, dikes, and revetments are in fair condi-
tion, except that the east jetty at Saybrook needs extensive repairs;
minor repairs are needed to the west jetty and to some of the other
structures above named.
            RIVERS AND HARBORS-PROVIDENCE,                                          R. I., DISTRICT                          81

  The channel dimensions are somewhat diminished.   On June 30,
1934 the controlling depths at mean low water were about 16 feet
across the bar at the mouth, thence about 10 feet to Hartford.                                                            To
complete the project requires the construction of a small amount of
additional permanent works. The costs under the existing project
have been $386,096.72 for new work and $525,178.85 for maintenance,
a total of $911,275.57, and the total expenditures $909,436.40.
  Proposed operations.-It is proposed to apply the funds unex-
pended on June 30, 1934, amounting to $25,609.47, as follows:
Accounts payable June 30, 1934-_                                  $1, 839.17
Maintenance:
    Dredging on river bars under contract in progress, to be com-
      pleted in September 1934_                                   16, 113. 56
    Repairs to permanent works, August and September 1934, by
      hired labor---------------------------------------           1, 656. 74
   Dredging on river bars, by contract, May and June 1935, 20,000
      cubic yards-     --                                          6, 000. 00

            Total -----------------------------------------------                                                 25, 609. 47
  The additional sum of $23,000 can be profitably expended during
the fiscal year 1936, as follows:
Maintenance :
   Dredging through river bars, July to September 1935, and June
      1936, by contract, about 60,000 cubic yards __ ________--__ $21, 000. 00
   Repairs to permanent works, August and September 1935, by
        hired      labor         ----                      _-__                                                    2, 000.00
                                                                                                        _-----------_

            Total-----                   ----------------------------------                                       23, 000. 00
  The above funds are required to meet routine maintenance re-
quirements after the spring freshets.
                                          Cost and financial summary

Cost of new work to June 30, 1934_ _____________________---
                                                __              $673, 471. 01
Cost of maintenance to June 30, 1934   ------------------------
                                                        _        891, 527. 32

      Total cost of permanent work to June 30, 1934-.....-___                                             1, 564, 998. 33
Minus accounts payable June 30, 1934 ----------------------                                                    1, 839. 17

        Net total expenditures--------------------------------1, 563, 159. 16
Unexpended balance June 30, 1934 ____________-________                                                            25, 609. 47

          Total amount appropriated to June 30, 1934___------------                                        1, 588, 768. 63


        Fiscal year ending June 30                       1930           1931           1932            1933           1934


Cost of new work-----------------------------
Cost of maintenance ---------------------- $66, 051. 82              $21, 177. 14   $15, 090. 84   $16, 682. 03     $22, 739. 77

Total expended -       .-   ....--------------------   70, 291. 57    19, 002. 02    17, 022. 99    16, 482. 68      21, 997. 22

Allotted...-----..----------------------               42, $00. 00    19, 500. 00 ------------ 19, 766. 79           22, 891. 15


Balance unexpended July 1, 1933_------------------------------ $24, 715. 54
Amount allotted from War Department Appropriation Act approved
   Mar.    4,   1933-------------------------------                                                               23, 000.00
      Amount to be accounted for_________________-------        _                                                 47, 715. 54
Deductions on account of revocation of allotment- _______--___-_                                                      108. 85

          Net amount to be accounted for____________________---_-                                                 47, 606.69
82       REPORT OF          CHIEF OF ENGINEERS,                 U.   S. ARMY,      1934

Gross amount expended                                 -------             $21, 997. 58
Less reimbursements collected-______                                              . 36
                                                                                         $21, 997. 22
      Balance unexpended June 30, 1934-------------------------        25, 609. 47
Outstanding liabilities June 30, 1934                    , 839. 17
                                                        1-----------------
Amount covered by uncompleted contracts------------- 16, 113. 56
                                                                        17, 952. 73

       Balance available June 30, 1934---------------------------                          7, 656. 74
Amount    (estimated)      required to be appropriated for completion
  of existing   project   1---__-----------                                                1, 900. 00
Amount that can be profitably expended in fiscal year ending June
  30, 1936, for maintenance 1                 -----                   ------             23, 000. 00

                      13. DUCK ISLAND HARBOR, CONN.

   Location.-On the north shore of Long Island Sound about 23
miles east of New Haven, Conn. (See U. S. Coast and Geodetic
Survey Chart No. 216.)
   Previous projects.-Adopted by the act of September 19, 1890.
The cost and expenditures prior to the adoption of the existing
project in 1910 were $114,867.90 for new work and $5,334.10 for
maintenance, a total of $120,202. For further details see page 1755
of Annual Report for 1915.
  Existing project.-This provides for the construction of 3 riprap
breakwaters, viz: 1 extending northwardly from Duck Island 1,100
feet; 1 extending westwardly from Duck Island 2,697 feet; and 1
extending southwardly from Stone Island, just south of Kelsey
Point, 3,750 feet-each breakwater to be 8 feet wide on top, 9 feet
high above mean low water, with side slopes of 2 on 3, except on the
northerly side of the one extending westerly from Duck Island and
the westerly side of the one extending northwardly from Duck
Island, where the slopes are to be 1 on 1; and for dredging to a
depth of 16 feet at mean low water a portion of the protected area
back of the breakwaters at Duck Island. The mean tidal range is.
4.2 feet, and the maximum range, due to the combined effect of
wind and other causes, is 9 feet or more.
   The estimate of cost for new work, revised in 1916, was $370,000,
exclusive of amounts expended on previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $10,000.
   The existing project was authorized by the following river and
harbor acts: The act of June 25, 1910, provided for the breakwaters:
 (H. Doc. No. 398, 60th Cong., 1st sess.) ; the act of July 27, 1916,
provided for the dredging (H. Doc. No. 812, 64th Cong., 1st sess.).
   For map, see the last-mentioned document.
   Terninal facilities.-None. Harbor used for refuge only.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1917 at a saving of $2,702 under the estimated cost, the
breakwaters having been completed in 1914. The breakwaters are
in fair repair but portions of the anchorage area are shoaler than
project depth. The controlling depths in the protected area behind
the breakwaters as determined in 1931 were 12 to I7 feetl in the
  1Exclusive of available funds.
             RIVERS         AND HARBORS--PROVIDENCE,                            R.   I.,    DISTRICT                   83
northern portion and in the southern portion about 8 feet, all at
mean low water. The costs and expenditures under the existing
project have been $367,297.91 for new work and $158,154.34 for
maintenance, a total of $525,452.25
  Proposed operations.-There were no funds available at the close
of the year and no work is contemplated.
  The sum of $92,000 can be profitably expended during the fiscal
year 1936 on maintenance dredging of about 460,000 cubic yards
from behind the breakwaters, by contract, July to October 1935.
These funds are required to remove extensive shoaling in the an-
,chorage area.
                                       Cost and financial summary
Cost of new work to June 30, 1934___________________________                                             $482, 165. 81
'Cost of maintenance to June 30, 1934____________________________                                         163, 488. 44
         Total cost of permanent work to June 30, 1934                                                    645, 054. 2:5
Net total expenditures____________________________                                                        645, 654. 25
         Total amount appropriated to June 30, 1934                           -- --                       645, 654. 25


         Fiscal year ending June 30                 1930          1931              i
                                                                                  1932            1933          1934

Cost of new work--------    ------------------ --------        ---------------------------------- ------------
Cost of maintenance      __
                         ------------------    ----------      $33, 356. 40 $33, 558. 44 -------------
Total expended     -----------------    -           $334. 04     9, 760. 49     56, 820. 31 -------         ------

Allotted      -     --------------     --------   74,200.00                    -8,556.33-



Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance __-________------------   ___          $92, 000.00

                                 14. BRANFORD HARBOR, CONN.

   Location.-On the north shore of Long Island Sound, 5 miles east
of New Haven Harbor. (See U. S. Coast and Geodetic Survey Chart
No. 217.)
   Existing project.-This provides for a channel 81/2 feet deep and
100 feet wide through the shoals at the mouth of the harbor, about
1/2mile and of the same depth, width, and length between the lower
and upper wharves in the river. The plane of reference is mean low
water. The mean tidal range is 51/2 feet, and the maximum range,
,due to the combined effect of wind and other causes, is 10 feet or
more. The estimate of cost for new work, revised in 1905, was
$10,000. The latest (1928) approved estimate for annual cost of
maintenance is $2,500.
    The existing project was authorized by the following river and
harbor acts: The act of June 13, 1902, provided for dredging be-
tween the lower and upper wharves in the river (H. Doc. No. 100,
.56th Cong., 2d sess., and Annual Report for 1901, p. 1188); the act
of March 2, 1907, provided for the dredging at the mouth of the
harbor. (For map. see H. Doc. No. 1292, 64th Cong., 1st sess.)
    Terminal facilities.-Terminal facilities are limited to two
wharves near the head of the harbor and one at the mouth of the
river. These facilities are considered adequate for the existing
commerce.
84           REPORT         OF CHIEF OF ENGINEERS,                            U. S.      ARMY,        1934

  Operations and results during fiscal year.-Maintenance dredging
under contract was begun on August 1 and completed on August 17,
1933. A total of 46,220 cubic yards of mud was removed, completing
the maintenance of the channel outside of Branford Point. The
costs were $9,366.04 for maintenance. Expenditures were $9,178.52.
  Condition at end of fiscal year.-The project was completed in
1907 at a saving of $462 under the estimated cost. The controlling
depths were 9 feet through the shoals at the mouth, as determined
in August 1933, and thence 8 feet nearly to the head of the improved
channel, as determined in 1932. The costs and expenditures under
the project have, been $9,537.45 for new work and $47,845.47 for
maintenance, a total of $57,382.92.
  Proposed operations.-There were no, funds available at the, close
of the year and no work is contemplated during the fiscal years 1935
and 1936.
                                              Cost and financial summary

Cost of new work to June 30, 1934__           __                                                                $9, 537. 45-
Cost of maintenance to June 30, 1934---------------------------                                                 47, 845. 47

      Total cost of permanent work to June 30, 1934--------------57, 382. 92
Net total expenditures------------------------------------        57, 382. 92
Total amount appropriated to June 30, 1934---------------------- 57, 382. 92

           Fiscal year ending June 30                   1930           1931            1932          1933           1934


Cost of new work_
Cost of maintenance      ------------------          $22, 794. 35        $6. 00    -                               $9, 366. 04
Total expended__-----------------------21, 572. 12                    1, 228. 23                    $187. 52        9, 178. 52

Allotted       -------------------------              15, 000. 00   -1, 000. 00        --
                                                                                        -      .   12, 781.40     -3, 615. 01


Balance unexpended July 1, 1933-     --.....                                                                $12, 793.53
Deductions on account of revocation of allotment                                              __              3, 615. 01
      Net amount to be accounted for----------------------_                                                      9, 178. 52
Gross amount expended_    _____                                                                                  9, 178. 52

                                  15. NEW HAVEN HARBOR, CONN.

  Location.-The harbor is on the north shore of Long Island
Sound, about 71 miles to the east of New York City. (See U. S.
Coast and Geodetic Survey Chart No. 218.)
  Previous projects.-Adopted by the acts of August 30, 1852, June
10, 1872, March 3, 1871, and March 3, 1905. The cost and expendi-
tures in the main harbor prior to the adoption of the 1899 project
and in West River prior to its consolidation with the main harbor
were $331,625.66 for new work and $32,570 for maintenance, a total
of $364,195.66. For further details, see'page 1755 of Annual Report
for 1915.
  Existing project.-This provides for a channel 20 feet deep, 400
feet wide, and 3 miles long from Long Island Sound to the inner
end of the 20-foot anchorage basin; thence of same depth, 700 to
500 feet wide (increased to 1,200 feet at the turn opposite Long
Wharf), 1.2 miles to Tomlinson Bridge; three anchorage basins:
below Tomlinson Bridge of 20-, 16-, and 15-foot depths; a pile-and-
        RIVERS AND HARBORS-PROVIDENCE,        R. I.,   DISTRICT   85
riprap dike, total length about 4,200 feet, to contract the tidal flow
at Fort Hale Bar; a channel 12 feet deep and 100 to 150 feet wide,
from the southwest corner of the 16-foot anchorage basin via Oyster
Point and the West Haven Wharf front to Kimberly Avenue Bridge;
thence 12 feet deep and prevailing width of 75 feet up West River
approximately to the railroad bridge, and an anchorage basin 6 feet
deep in West River opposite Mars Wharf; a channel 100 feet wide
and 12 feet deep from the 15-foot anchorage basin toward Brewery
Street, about 1,500 feet; a channel 200 feet wide and 18 feet deep up
Quinnipiac River to Ferry Street Bridge, and thence 200 feet wide.
and 16 feet deep to Grand Avenue; a channel up Mill River 12
feet deep, 200 feet wide, to the junction of the two branches above-
Chapel Street, thence 12 feet deep to Grand Avenue, 100 feet wide in
the east branch and generally 125 feet wide in the west branch; and
the removal of certain obstructive rocks in Morris Cove. All depths
refer to mean low water, the mean tidal range being 5.8 feet. The
maximum tidal range, due to the combined effect of wind and other
causes, is 10 feet or more.
   The estimate of cost for new work, revised in 1930, was $643,000,.
exclusive of amounts expended on previous projects. The latest
 (1930) approved estimate for annual cost of maintenance is $27,500.
   The existing project was authorized by the following river and
harbor acts: The act of August 2, 1882, provided for the Sandy
Point Dike (plans approved by a Board of Engineers Oct. 2,
1882); the act of March 3, 1899, provided for the present depth of
the main channel and the dimensions of its lower end and for the 20-
and 16-foot anchorage basins (H. Doc. No. 82, 55th Cong., 1st sess.) ;
the act of June 25, 1910, provided for the Brewery Street Channel,.
for the removal of rocks in Morris Cove, and made provisions for
the present dimensions of the 15-foot basin (H. Doc. No. 1159, 60th
Cong., 2d sess.); the act of July 25, 1912, made provisions for the
present dimensions of the channels in Mill River, (H. Doc. No. 26,
62d Cong., 1st sess.), and for the present dimensions of the West
River Channel and anchorage (H. Doc. No. 535, 62d Cong., 2d sess.) ;
the act of March 4, 1913, provided for the present widths in the
upper part of the main channel (H. Doc. No. 1258, 62d Cong., 3d
sess.) ; and the act of July 3, 1930, made final provisions for the
present channel dimensions in Quinnipiac River (H. Doc. No. 686,
69th Cong., 2d sess.). For maps see the last-named document and
House Documents Nos. 497, Sixty-fourth Congress, first session, and
479, Seventy-second Congress, second session.
   Supplementing the work authorized by Congress, the further im-
provement of New Haven Harbor, Conn., to provide for a depth of
25 feet in the main channel extending from Long Island Sound to
Tomlinson Bridge, following substantially the lines of the present
channel, with a width of 400 feet in the outer portion and 500 feet
in the inner portion, and widened at the bend, recommended by the
Chief of Engineers in House Document No. 479, Seventy-second
Congress, second session, was included in the Public Works program
under the National Industrial Recovery Act.
   Recommended modifications of project.-Included in the Public
Works program.
86       REPORT    OF CHIEF OF ENGINEERS,            U.   S.   ARMY,   1934

    Terminal facilities.-The wharves and piers served by this im-
Iprovement are grouped near the head of the main harbor; on both
sides of Mill River between Chapel Street and Grand Avenue; on
 .both sides of Quinnipiac River throughout the greater part of its
improved portion; at Oyster Point and along the westerly side of
West River. The total length of berthing space available is about
:26,525 feet. The facilities are not considered adequate, and various
plans have been prepared and considered by the municipality for
extensive additions and improvements.         (For further details see
Port Series No. 18, Corps of Engineers.)
      Operations and results during fiscal year.--None under the exist-
ing project.
    As authorized by the Federal Emergency Administration of Pub-
lic Works, improvement dredging in the main channel using Govern-
ment plant was begun November 1, 1933, and was in progress at the
'close of the fiscal year. During this period the U. S. dredge W. L.
Marshall, operating from November 1, 1933, to January 20, 1934,
removed 692,494 cubic yards, bin measurement, and the U. S. dredge
Atlantic, operating after January 22, 1934, removed 1,209,792 cubic
yards, bin measurement. As a result the channel had been com-
pleted, except for the removal of minor shoals, up to opposite Fort
-Hale. The costs were $170,909.51, all for new work. The expendi-
tures amounted to $161,336.87.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1931 at a saving of $45,006 under the estimated cost. The
controlling depths at mean low water are main channel up to Fort
-Hale, 25 feet, except for a small ledge area, with 21 feet opposite
Southwest Ledge Light., as determined in 1934; thence to Tomlinson
Bridge, 20 feet as determined in 1933; anchorage basins, 20 feet, 14
to 16, and one-half foot to 6 feet, respectively; West River, 13 feet as
determined in 1931; Mill River, 12 feet as determined in 1932; Quin-
nipiac River to Ferry Street, 18 feet, and thence to Grand Avenue,
nearly 16 feet; and Brewery Street Channel, nearly 13 feet as deter-
mined in 1931. The dike at Fort Hale Bar is in poor repair and the
{channels are generally in good condition. The costs and expendi-
tures have been $597,993.54 for new work and $795,936.36 for main-
tenance, a total of $1,393,929.90.
    Work in the main channel authorized by the Public Works Admin-
istration is nearly completed up to Fort Hale and a small amount of
.dredging has been done between there and Tomlinson Bridge. The
costs have been $170,909.51, all for new work, and the expenditures
have amounted to $161,336.87, all from Public Works funds.
    Proposed operations.-There were no funds from regular appro-
priations available at the close of the fiscal year and no operations
are contemplated.
    It is proposed to apply the Public Works funds unexpended on
June 30, 1934, amounting to $130,663.13, together with $100,000 al-
lotted in July, as follows:
Accounts payable June 30, 1934 __ __________________             $10, 255. 33
Improvement dredging in main channel by sea-going hopper dredge
  in progress, to be completed in February 1935____ -_______ __- 201,407. 80
Rock removal from main channel opposite Southwest Ledge, by con-
  tract, August to October 1934, about 344 cubic yards____--_--           19, 000.00

      Total--_-_----              _----___       __---__-_____           230,663. 13
            RIVERS AND HARBORS-PROVIDENCE,                                                     R. I.,     DISTRICT                   87
  The harbor channels and anchorages are believed to be in condition
to meet the needs of present traffic for at least 2 more years. There-
fore no additional funds can be profitably expended during the fiscal
year 1936.
                                        Cost and financial summary

                              MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934 __                                        ----------                               $929, 619. 20
Cost of maintenance to June 30, 1934_                                      ____-______                     ___        828, 506. 36
       Total cost of permanent work to June 30, 1934               1, 758, 125. 56             ----------
Net total expenditures                               _______-- -1, 1_______-________
                                                                      758, 125. 56
Total amount appropriated to June 30, 1934_ ........ ___ ___--- 1,758, 125. 56

   Fiscal year ending June 30                  1930                 1931                   1932             1933              1934


Cost of new work   _-            __     -
                                 __--....             -_______.
                                                           $106, 887. 26                 $1, 581. 34 ...      .      04...............
Cost of maintenance .------          .. $131, 389. 48              60,592. 37            24, 088. 74      $18, 040. 04 .. .....
                  ................ 131,389. 48
      Total cost------------                                     167, 479. 63            25, 670. 08       18, 040. 04
Total expended ...---   ---    .--           85, 507. 98         186, 245. 17            51, 062. 48       16, 766. 00
            ---
Allotted- ....-..............          -.....
                                            __                   189, 000. 00           -16, 807. 48      -3, 007. 88


                                               PUBLICO WORKS FUNDS

Cost of new work to June 30, 1934___--_________-                                                         _____       $170, 909. 51
Cost of maintenance to June 30, 1934_

      Total cost of permanent work to June 30, 1934___-__-__                                                             170, 909. 51
Value of plant, materials, etc., on hand June 30, 1934-.. ________                                                            682. 69
      Net total cost to June 30, 1934   -                                                         -          -
                                                                                                          ___--           1___________---
                                                                                                                         171, 592'. 20
Minus accounts payable June 30, 1934 __________                                                __________10,                  255. 33
     Net total expenditures___________________            _                                                              161, 336. 87
                                  --------------------------
Unexpended balance June 30, 1934__________                                                                               130, 663. 13
        Total amount appropriated to June 30, 1934- ----                                              ______--           292, 000. 00'

   Fiscal year ending June 30                  1930                 1931                   1932              1933             1934

                             ----
Cost of new work__-_----------------------                                                                             $170,909. 51
Cost ofmaintenance--------   -        ---------------
                                                   ------------                                       -------------------------
Total expended...---------------                  ------------------------------------------                                 161, 336. 87
Allotted........              -------------------------------------------------------                                        292, 000. 00


Amount allotted from National Industrial Recovery Act approved
  June 16, 1933     ----------------------------------------     $292, 000. 00
Gross amount expended______------_______--                   - _  161, 336. 87
      Balance unexpended June 30, 1934________________________                                                           130, 063. 13
Outstanding liabilities June 30, 1934                                                                                      0, 255. 33
                                                                                                                          1-------------------------

     Balance available June 30, 1934_ -----------------------                                                             120, 407. 80
Aniount allotted by Public Works Administration Emergency Ap-
propriation Act fiscal year 1935____________________________--                                                          100, 000. 00

         Balance available for fiscal year 1935-------------------                                                        220, 407. 80
    '88          REPORT           OF ChIEF OF ENGINEERS,                     U.     S.     ARMY          1934

    CONSOLIDATED           COST   AND   FINANCIAL         SUMMARY          FOR    NEW      HAVEN         HARBOR.      CONN.


    'Cost of new work to June 30, 1934__                                                                 $1, 100, 528. 71
     Cost of maintenance to June 30, 1934-----------------------_                                            828, 506. 30
          Total cost of permanent work to June 30, 1934 ------                                             1, 929, 035. 07
*   Value of plant, materials, etc., on hand June 30, 1934----------                                               682. 69
           Net total cost to June 30, 1934                                                                 ,929, 717. 76
                                                                                                          1---------------------
    .Minus accounts payable June 30, 1934-----------------------                                              10, 255. 33
          Net total expenditures-------                                                                   1,919, 462. 43
    Unexpended balance June 30, 1934-------------------------                                               130, 663. 13

              Total amount appropriated to June 30, 1934-----------                                       2,050, 125. 56


        Fiscal year ending June 30           1930             1931               1932             1933              1934


    Cost of new work______________                         $106,887.26       $1, 581. 34_                       $170, 909. 51
    Cost of maintenance_______           $131, 389. 48       60, 592. 37     24, 088. 74        $18, 040. 04____________

          Total cost----------------       131, 389. 48     167, 479. 63     25, 670. 08         18, 040. 04       170, 909. 51

    Total expended-----------------        85,507. 98       186, 245. 17     51,062. 48          16, 766. 00       161, 336. 87

    Allotted _----------     ---------------------
                                       ______________       189, 000. 00    -16, 807. 40        -3, 007. 88        292, 000. 00


    Amount allotted from National Industrial Recovery Act approved
      June 16, 1933---------------------------------------------   $292, 000. 00
    Gross amount expended__ ______--___-----   __--_----            161, 336.87

                                            ------------------------
             Balance unexpended June 30, 1934_                                                                 130, 663. 13
    Outstanding liabilities June 30, 1934 ______-----___-_._                        ---------                   10, 255. 33

         Balance available June 30, 1934___-_ ________---------        120, 407. 30
    Amount allotted by Public Works Administration Emergency Ap-
     propriation Act, fiscal year 1935   _------------------------.... 100, 000. 00

             Balance available for fiscal year 1935_ ______-___-----                                           220, 407. 80

                                     16. MILFORD HARBOR, CONN.

      Location.- This harbor is on the north shore of Long Island
    Sound, about 8 miles west of New Haven Harbor. (See U. S. Coast
    and Geodetic Survey Chart No. 219.)
      Previous projects.---Adopted by acts of June 23, 1874, June 18,
    1878, June 14, 1880, and August 2, 1882. The cost and expenditure,
    prior to the adoption of the existing project in 1902, were $42,340.44
    for new work and $3,159.56 for maintenance, a total of $45,500. For
    further details see Annual Report for 1915, page 1756.
      Existing project.-This provides for two riprap jetties 510 and
    250 feet in length on the east and west sides, respectively, of the en-
    trance to the river; a channel across the bar and through the lower
    harbor 100 feet wide and 10 feet deep to Merwin's Wharf, a dis-
    tance of about 3,000 feet; an anchorage basin of same depth, of about
    6 acres in area, on the east side of the channel; and a channel 90 feet
    wide and 6 feet deep through the river from Merwin's Wharf to the
    Straw Works Wharf, a distance of about 3,500 feet. All depths re-
    fer to the plane of mean low water. The mean tidal range is 6.2 feet
    and the extreme range, due to the combined effects of wind and other
    causes, is 10 feet or more.
        RIVERS AND    HARBORS-PROVIDENCE,       R.   I.,   DISTRICT   89
    The estimate of cost for new work, revised in 1928, is $48,000, ex-
clusive of amounts expended on previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $1,300.
    The existing project was authorized by the following river and
harbor acts: The act of June 23, 1874, provided for the east jetty at
the mouth of the river (H. Ex. Doc. No. 107, 42d Cong., 3d sess., and
Annual Report for 1873, p. 1042) ; the west jetty at the mouth of the
river was authorized October 16, 1879 (Annual Report for 1879, p.
342); the act of June 13, 1902 provided for the present channel
dimensions and for an anchorage basin (H. Doc. No. 280, 56th Cong.,
1st sess., and in Annual Report for 1900, p. 1357). For maps, see
House Document No. 232, Sixty-third Congress, first session.
    Terminal facilities.-There are five wharves in commercial use on
this improvement, one of which is owned by the town. The unload-
ing facilities are inefficient. Enlarged and improved facilities are
desirable.
    Operations and results during fiscal year.-Under a contract for
maintenance in the 10-foot channel, dredging in progress at the
beginning of the fiscal year was completed July 17, 1933. During
the period 16,911 cubic yards were removed by the hydraulic proc-
ess, completing the restoration of the channel. The total yardage
removed under the contract was 38,705. The costs were $3,793.68,
all for maintenance, and the expenditures were $6,062.15.
    Condition at end of fiscal year.-The existing project is 49 percent
-completed. The jetties were completed in 1880 and the entrance
=channel in 1905. The channel through the river has been dredged
to a point 500 feet above the town wharf, and 21/3 acres of the
anchorage area on the east side of the channel has been dredged 10
feet deep; further extension of the new channel and anchorage at
reasonable cost was prevented by ledge rock; to compensate for the
lack of anchorage on the east side, a basin 1.6 acres in area has been
dredged on the west side. The head of navigation is 1 mile from
the head of the bay. The jetties are in fair condition. The con-
trolling depths at mean low water are 101/2 feet to Merwins Wharf
as determined in July 1933; thence about 5 feet to the town wharf,
thence not over 3 feet to the head, as determined in 1930. The
average depths in the east and west basins are about 7 and 5 feet,
respectively. To complete the project requires the dredging of
about 1.9 acres additional anchorage area and the extension of the
6-foot channel about 560 feet. The costs and expenditures under
the existing project to the end of the fiscal year have been $23,617.33
for new work and $26,653.43 for maintenance, a total of $50,270.76.
    Proposed operations.-There were no funds available at the close
,of the year and no operations are contemplated.
    The channels are believed to be in condition for existing traffic and
there is no immediate necessity for extending the anchorages and
channel. Therefore no funds can be profitably expended during the
fiscal year 1936.
90           REPORT OF CHIEF OF ENGINEERS,                               U.   S.   ARMY,      1934

                                        Cost and financial summary
Cost of new work to June 30, 1934_11111111111111111                                    1            $65, 957. 77
Cost of maintenance to June 30, 1934     --------                                                    29, 812. 99

      Total cost of permanent work to June 30, 1934-------------                                        95, 770. 76
Net total expenditures    ------------------------------------                                          95, 770. 76
Total amount appropriated to June 30, 1934-------------------                                           95, 770. 76

         Fiscal year ending June 30                     1930      1931         1932         1933             1934


Cost of new work-......-------------------------                                ------------ -
                    ---
Cost of maintenance___        .-        -____________--___     ------      ----------    $4,477.07         $3, 793. 68
Total expended           -------------------------------------------------                 2, 208. 60        6, 062. 15.
Allotted---------             ----------------------------------------------               9,949 67       -1, 678. 92


Balance unexpended July 1, 1933--------------------------------$7,                                          741. 07
Deductions on account of revocation of allotment                                                            678. 92'
                                                                                                         1------------------,

      Net amount to be accounted for                              ----------------------                 6, 062. 15
Gross amount expended                                                                                       062. 15
                                                                                                         6---------------------------
Amount (estimated) required to be appropriated for completion of
existing project  -----------------------------------------     24, 300. 00

                                  17. HOUSATONIC RIVER, CONN.

   Location.-Rises in northwestern Massachusetts, flows southerly
130 miles through Massachusetts and Connecticut, and empties into
Long Island Sound at Stratford, 5 miles east of Bridgeport Harbor.
 (See U. S. Coast and Geodetic Survey Chart No. 219.)
   Existing project.-This provides for a channel 18 feet deep at
mean low water and 200 feet wide from the mouth to the lower end
of Culvers Bar, about 5 miles, and thence 7 feet deep and 100 feet
wide to Derby and Shelton, about 8 miles; a riprap breakwater at:
the mouth, consisting of an inner arm 3,250 feet long, 3 feet high
above mean low water, top width 6 feet, side slopes 1 on 1, and an
outer arm 2,500 feet long, 6 feet high above mean high water, top
width 12 feet, outer slope 1 on 2, inner slope 1 on 1; a riprap dike
in the river below Stratford not to exceed 1,500 feet in length; and a
riprap jetty 163 feet long at Sow and Pigs Rocks. The mean tidal
range, exclusive of the winter season and freshets, is 6.4 feet at the
mouth, 5.4 feet at Stratford, and 5.1 feet at Shelton; the extreme
range due to combined effect of wind and other causes is about 11
feet at the mouth, diminishing toward the head. The spring freshets
occasionally rise to a height of 18 feet or more above summer low
water, but only average about 12 feet above that datum.
   The estimate of cost for new work, revised in 1928, is $810,000, of
which $150,000 is to be contributed by local interests. The latest
 (1930) approved estimate for annual cost of maintenance is $19,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1871, provided for a jetty at Sow
and Pigs Reef and the present width of the channel across the outer
bar (H. Doc. No. 95, 41st Cong., 3d sess., and Annual Report for
1871, p. 781); the act of August 11, 1888, provided for the break-
water at the mouth and for the present dimensions of the river
        RIVERS AND HARBORS-PROVIDENCE,         R. I.   DISTRICT     91
channel above the lower end of Culvers Bar (S. Doc. No. 103, 50th
Cong., 1st sess., and Annual Report for 1888, p. 554). The con-
struction of the Stratford Dike, in accordance with the project sub-
mitted by the district engineer officer July 15, 1892, was authorized
by departmental action. The act of July 3, 1930, made final pro-
vision for the present channel dimensions up to Culvers Bar (H. Doc.
No. 449, 70th Cong., 2d sess.). The latest published map is in the
last-named document.
   Local cooperation.-The River and Harbor Act of July 3, 1930,
authorized the 18-foot channel up to Culvers Bar subject to the pro-
vision that no work shall be started until local interests have con-
tributed $150,000 toward the cost of the work, and provided further,
that local interests shall furnish, free of cost to the United States,
suitable bulkheaded areas for the deposit of dredged material, or in
lieu thereof an additional $50,000 in cash. These conditions have
not been complied with, but spoil areas have been secured and the
provision of more than one-half of the necessary funds assured.
   Terminal facilities.-There are 3 wharves for commercial use at
Stratford, 1 at Devon, and 8 at Shelton and Derby. The facilities
are considered adequate for the existing commerce.
   Operations and results during fiscal year.-Maintenance dredging
under contract, in progress from June 1, to June 23, 1934, restored
the project depth through a shoal formed just above Drews Bar by
an ice jam, by the removal of 5,028 cubic yards of sand. The costs
were $3,496.84, all for maintenance. Expenditures were $3,296.60.
   Condition at end of fiscal year.-The existing project is about 29
percent completed. The upriver channels were completed in 1893.
The breakwater at the mouth is completed, except that the outer arm
has a top width of 8 feet and outer slope of 1 to. 11/2 instead of the
respective project dimensions; the Stratford Dike is 1,255 feet long,
and the jetty at Sow and Pigs Rocks is completed. The breakwater,
dike, and jetty are in fair condition. The bar channels have been
maintained to depths of 7 feet. The controlling depth on June 30,
1934, is about 7 feet at mean low water up to Shelton. To complete
the project requires the enlargement of the outer arm of the break-
water to provide a top width of 12 feet and an outer slope of 1 on 2,
which is not required for performance, the extension of the Stratford
Dike not more than 245 feet, and the deepening and widening of the
channel from the mouth up to the lower end of Culvers Bar. The
costs have been $234,364.92 for new work and $175,500.33 for mainte-
nance, a total of $409,865.25, and total expenditures $409,665.01.
    Proposed operations.-It is proposed to apply the funds unex-
pended on June 30, 1934, amounting to $200.24, to the payment of
accounts payable.
    No additional funds can be profitably expended during the fiscal
year 1936, as the bar channels are believed to be in condition to meet
the requirements of commerce during that period. The enlargement
of the outer breakwater and the extension of Stratford Dike are
not urgently required, and the fulfillment of conditions of local co-
operation as to the 18-foot channel authorized by the act of July
3, 1930, is not assured.
92             REPORT OF CHIEF OF ENGINEERS, U.                                                  S. ARMY,                  1934

                                                Cost and financial summary
Cost of new work to June 30, 1934___ ________ _                                                           --        --          $234, 364. 92i
                                          11      11
Cost of maintenance to June 30, 1934_ __________________11                                                                       175, 500. 33
      Total cost of permanent work to June 30, 1934                                              ------------                    409, 865.    25
Minus accounts payable June 30, 1934.                                                                                                 200.    24
      Net total expenditures-------------------------409,-----                                                                        665.    01
Unexpended balance June 30, 1934                                                                                                      200.    24
            Total amount appropriated to June 30, 1934______________                                                             409, 865. 25

           Fiscal year ending June 30                        1930                  1931            1932                  1933          1934

Cost of new work------
Cost of maintenance---------------                         --                                       $75. 00         $9, 574. 67       $3, 496. 84-
Total expended------------------                                  $50. 75          $664. 42         807. 67          8,177. 68         3, 296. 60
Allotted --------                          ---------       15, 000. 00      - ------                 ---- -7,081. 59                   3,496. 84

Amount alloted from War Department Appropriation Act approved
    July       14,     1932_ ______--               _---                                                                          $3, 500. 00
Deductions on account of revocation of allotment--      --                                                                              3. 16
      Net amount to be accounted for--_-                                                                                           3, 496. 84
Gross amount expended --         -- -        -------                                                                               3, 296. 60
      Balance unexpended June 30, 1934-------------------------                                                                       200. 24
Outstanding liabilities June 30, 1934-----------------------------                                                                    200. 24
Amount (estimated) required to be appropriated for completion of
existing project 1------------------------------                425, 000. 00
                   18. BRIDGEPORT HARBOR, CONN.
  Location.--On the north shore of Long Island Sound, about 57
miles east of New York City. (See U. S. Coast and Geodetic Survey
Chart No. 220.)
  Previous projects.-Adopted by the River and Harbor Acts of'
July 4, 1836, March 3, 1871, July 4, 1836, and July 5, 1884. The cost
and expenditures prior to operations in 1900 under the project of'
1899, were as follows:

                                                                                          New work             Maintenance           Total

Bridgeport Harbor --..----------------------------                             -          $311,899. 53            $5, 948. 97       $317,;848.50;
Black Rock Harbor ...-                                                                      66, 550. 00            6,000. 00          72, 550. 00.
        Total--------------------................            --          .-
                                                                      - ----   ---         378, 449. 53           11, 948. 97        390, 398. 50:


     For further details see page 1756 of Annual Report for 1915,.
     Existing project.-This provides for-
   (1) Two riprap breakwaters, one about 3,190 feet long on the easterly side,
and one 2,110 feet long on the westerly side of the entrance to the main, harbor.
   (2) The construction and maintenance of shore protection on Fayerweather
Island, including a sea wall connecting the northerly and southerly portions
of the island.
   (3) Main channel 25 feet deep and 300 feet wide from Long Island Sound
to the inner end of the 25-foot anchorage basin, thence 18 feet deep and 300
feet wide to Stratford Avenue Bridge across the Poquonock River.
   (4) Three anchorage basins: One 25 feet deep and 29.4 acres in area, oppo-
site the inner breakwater; one 18 feet deep and 30.6 acres in area, adjoining
the main channel on the east above the inner breakwater; and one 12 feet
deep, in two areas, aggregating 28.4 acres to the east of the IS8foot anchorage..

    1In addition, $150,000 is to be contributed by local interests.
         RIVERS AND HARBORS-PROVIDENCE,             R.   I.,   DISTRICT

   (5) Poquonock River Channel, 18 feet deep and from 125 to 200 feet wide,
from the lower bridge to a point about 500 feet below the dam at Berkshire
Avenue, about 1.1 miles.
   (6) Yellow Mill Channel, 18 feet deep and 150 to 200 feet wide from the
18-foot anchorage to a point about 370 feet from Crescent Avenue, about 1 mile.
   (7) Johnsons River Channel, 18 feet deep and 150 to 250 feet wide from the
25-foot anchorage to a point 600 feet below Hollisters Dam, about 1 mile.
   (8) Black Rock and Cedar Creek Channel, 18 feet deep and 100 to 200 feet
wide, from the 18-foot curve in Black Rock Harbor to the heads of both
branches of Cedar Creek, about 2.4 miles.
   (9) Burr Creek Channel, 7 feet deep and from 100 to 75 feet wide, from its.
junction with Cedar Creek Channel to the head of navigation, about one-half
mile.
   All depths refer to mean low water, the mean tidal range being
6.4 feet. The extreme tidal range, due to wind and other causes, is,
11 feet or more.
   The estimate of cost for new work, revised in 1930, is $1,217,500,
of which $39,000 is to be contributed by local interests, exclusive of
amounts expended under previous projects. The latest (1930) ap-
proved estimate for annual cost of maintenance is $25,000.
   The existing project was authorized by the following river and
harbor acts: The act of July 4, 1836, provided for the Fayerweather
Island sea wall; the act of March 3, 1899, provided for the shore
protection of Fayerweather Island (Annual Report for 1899, p.
1173); the act of March 2, 1907, provided for the west breakwater
and the present dimniensions of the east breakwater (H. Doc. Nos.
275 and 521, 59th Cong., 2d sess.) ; the act of March 2, 1919, pro-
vided finally for the present dimensions of the 18- and 12-foot an-
chorage basins and Burr Creek Channel (H. Doc. No. 898, 63d
Cong., 2d sess.) ; the act of July 3, 1930, made final provisions for
the present dimensions of the 25-foot channel, the 25-foot anchorage,
the channels through the main harbor, Poquonock River, Yellow
Mill Pond, Johnsons River, Black Rock Harbor, and Cedar Creek
 (H. Doc. No. 281, 71st Cong., 2d sess.). The latest published map
is in the last-mentioned document.
   Local cooperation.-The River and Harbor Act of July 3, 1930,
required as a condition precedent to work on the Johnsons River
Channel that local interests contribute one-half ($39,000) of the esti-
mated cost of that work. This condition has not been met. Pre-
liminary surveys and studies for the development of the contiguous
territory have been made, but financial arrangements have not been
completed.
   Terminal facilities.-The total length of berthing space available
is 18,905 feet. While the existing wharves appear to be adequate
for the present commerce, increased terminal and transfer facilities
are desirable to serve the increased commerce to be expected by a
rapidly growing municipality. (For further details see Port Series
No. 18, Corps of Engineers.)
   Operations and results during fiscal year.-Under a contract for
improvement, dredging in the main channel and 25-foot anchorage
basin, in progress at the beginning of the fiscal year, work was com-
pleted September 20, 1933. During the period 60,759 cubic yards
of mud and sand were removed from the channel, deepening it to
25 feet. The amounts of material removed under the contract were
367,186 cubic yards from the anchorage and 592,741 cubic yards from
the channel, a total of 959,927 cubic yards. The costs were
$15,153.71 for new work. Expenditures were $30,766.10.
94          REPORT OF CHIEF OF ENGINEERS,                                 U.        S. ARMY,        1934

   Condition at end of fiscal year.-The existing project is about 85
percent completed. The Black Rock, Cedar Creek, and Yellow Mill
Channels have been completed. The 25-foot anchorage and the
entrance channel have been completed. The other harbor channels
and basins have been dredged to the dimensions previously author-
ized. The breakwaters were completed in 1908. The anchorage
basins and channel are in fair condition. The breakwaters at the
entrance are in need of repairs; the shore-protection works on Fayer-
weather Island are in good condition; and the Fayerweather Island
breakwater and sea wall need repairs.
   The controlling depths at mean low water are: Main channel to
just inside the inner breakwater, 25 feet as determined in 1933, and
thence nearly 18 feet to the lower bridge, as determined in 1927;
Poquonock River, 16 feet to Black's coal wharf, and thence to the
head of the improved channel, nearly 12 feet as determined in 1932;
Yellow Mill Channel, 18 feet to the head of the improved channel
except for rocky shoal on east side near upper end as determined in
1932; Johnsons River, 12 feet to the first bend at the entrance to the
river, and thence nearly 10 feet to the head of the channel as de-
termined in 1929; Black Rock Harbor, 18 feet, as determined in 1932;
Cedar Creek, 18 feet to the head of the branches, as determined in
1931; Burr Creek, about 31/2 feet to its head, as determined in 1923;
anchorage basins, 14 to 22 feet, 18, and 9 to 12 feet respectively.
   Costs have been $1,032,797.60 for new work and $265,844.59
for maintenance, a total of $1,298,642.19 and total expenditures
$1,298,642.19.
   Proposed operations.-There were no funds available at the close
of the year and no work is contemplated during the fiscal year 1935.
   The sum of $74,500 can be profitably expended during the fiscal
year 1936, as follows:
New work :
   Dredging Poquonock River, by contract, September-December 1935,
      50,000 cubic yards--------------------------------------- $13, 000
Maintenance :
   Dredging Poquonock River, by con ract, September-D :ecember 1935,
         70,000 cubic yards-----------                                                                         17, 500
      Repairs to breakwaters at entrance to harbor, by contract, 8,000
         tons--         -----         -                                                                        40, 000
      Repairs to Fayerweather Island breakwater and sea wall, by
       hired labor--------------------------- ----------------------                                            4, 000

         Total for all work                                                                               --     4,500
                                                                                                                7--------------------------
                                     Cost and financial summary
Cost of new work to June 30, 1934---------------------------                                         $1,411, 247. 13
Cost of maintenance to June 30, 1934--------------------                                                277, 793. 56

       Total cost of permanent work to June 30, 1934 -----                                    _-          6, 040. 69
                                                                                                       1 689,
Net total expenditures---------------------------------------_                                         1, 689, 040. 69
Total amount appropriated to June 30, 1934___                                                          1, 689, 040.    39
         Fiscal year ending June 30                 1930           1931              1932          1933         1934


Cost of new work _____-....-___             -         ._______...$78, 666. 27 $53, 499. 45 $171, 987. 52   $15, 153. 71
Cost of maintenance-____
                       .........           ...                      . ______ ______ _
                                                  $6, 438. 79 - ______                        5, 055. 63 ___________
      Total cost ...       -----......--- ....... 6, 438. 79     78, 666. 27    53, 499. 45    177, 043. 15    15, 153.71
Total expended--...... -----------                 6, 144. 87    61, 987. 07    64, 332. 53    168, 708. 59    30, 766. 10
Allotted. ---------------------------------_                    137, 000. 00-----              171, 882. 52     6, 026. 21
          ERVERS     AND   HARBORS-PROVIDENCE,              R,         I.,   DISTRICT        95
Balance unexpended July 1, 1933-------    ____        _____________ $24, 739. 89
Amount allotted from Emergency Relief and Construction Act
approved July 21, 1932_____________________----------------------------------- 6, 252. 97
     Amount to be accounted for---------------------------                          30, 992. 86
Deductions on account of revocation of allotment-----------------                       226. 76
      Net amount to be accounted for- ___--_____---,, -      -__                    30, 766. 10
Gross amount expended       -------------------------   $30,766.28
Less reimbursements collected---    ---------------------        . 18
                                                                                    30, 766. 10
Amount (estimated) required to be appropriated for completion of
  existing project 1---        ---         -----           --                  -    52, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1936:
   For new work         ---------------------------------------                     13, 000. 00
   For maintenance__--- -----                     ___                               61, 500. 00
       Total                           -------              --------                  4, 500. 00
                                                                                    7---


                          19. NORWALK HARBOR, CONN.

     Location.-On the north shore of Long Island Sound, about 44
miles east of New York City. (See U. S. Coast and Geodetic Survey
Chart No. 221.)
    Previous projects.-Adopted by acts of June 10, 1872, June 3, 1896,
and March 2, 1907. The cost and expenditures on these projects
.were   $162,516.81 for new work and $66,120.44 for maintenance, a
total of $228,637.25. For further details see page 1757 of Annual
Report for 1915.
    Existing project.-This provides for a channel 12 feet deep from
the outer harbor to the highway bridge at South Norwalk, about 31/s
miles, 200 feet wide to Dorlons Point, thence 150 feet wide to South
Norwalk, and 250 feet wide along the South Norwalk wharves; an
anchorage basin 10 feet deep and about 17 acres in area opposite
Fitchs Point; a channel 10 feet deep and generally 100 feet wide
from South Norwalk to the head of navigation at Norwalk, about
1.5 miles; and for the maintenance of the channel 6 feet deep and
75 feet wide along the east side of the harbor to the head of naviga-
tion at East Norwalk. The reference plane is mean low water, the
mean tidal range being 6.8 feet. The maximum range due to the
combined effect of wind and other causes is 12 feet or more.
     The estimate of cost for new work, revised in 1927, was $284,000,
exclusive of amounts expended on previous projects. The latest
  (1919) approved estimate for annual cost of maintenance is $8,000
for the first 3 years and $4,000 thereafter.
     The existing project was adopted by the River and Harbor Act
of March 2, 1919 (H. Doc. No. 1143, 63d Cong., 2d sess.). For the
latest published map see the project document.
     Local cooperation.-Fully complied with.
     Terminal facilities.-The facilities are considered adequate for the
existing commerce. The total length of berthing space available
is 6,165 feet. (For further details see Port Series No. 18, Corps
of Engineers.)
     Operations and results during fiscal year.-None.
  1In addition, $39,000 is to be contributed by local interests.
      91536-ENG 1934-- 7
96            REPORT OF CHIEF OF ENGINEERS,                                     U.       S.     ARMY,     1934

  Condition at end of fiscal year.-The project was completed in
1929 at a saving of $27,310 under the estimated cost. The controlling
depths at mean low water are: To Gregorys Point, nearly 13 feet; as
determined in 1930; thence to Washington Street Bridge at South
Norwalk, 11 feet; in the anchorage basin, 8 to 11 feet, as determined
in 1932; between South Norwalk and Norwalk, about 9 feet (not full
width) as determined in 1933; and in the East Norwalk Channel
about 7 feet to the head, as determined in 1933. The head of navi-
gation is at Norwalk. The costs and expenditures under the existing
project have been $256,689.72 for new work and $84,327.19 for main-
tenance, a total of $341,016.91.
  Proposed operations.-It is proposed to apply the funds unex-
pended on June 30, 1934, amounting to $43,000 to maintenance
dredging in Norwalk River Channel, by contract, August to Novem-
ber 1934, in removing about 172,000 cubic yards.
  The completion of the above, work will leave the harbor channels
in condition to meet the requirements of navigation for at least 2
more years. Therefore no additional funds can be profitably ex-
pended during the fiscal year 1936.
                                          Cost and financial summary
Cost of new work to June 30, 1934   ------------------------- $419, 206. 53
Cost of maintenance to June 30, 1934------------------------ 150, 447. 63
          Total cost of permanent work to June 30, 1934 ...........                                            569, 654. 16

Net total expenditures-----------------------------------   569, 654. 16
Unexpended balance June 30, 1934---------------------------43, 000. 00
                                                             ----
          Total amount appropriated to June 30, 1934----------                                                 612, 654. 16

          Fiscal year ending June 30                     1930           1931              1932          1933           1934


Cost ofnew work                 ___-------------
                                     _-...               $149.65 ---------------------------------
Cost of maintenance ---------------------               8, 331. 86 $38, 264. 44     -----------
                                                                                          $11, 869. 66             .

       Total cost------       ----------------          8, 481. 51    38, 264. 44      -________ _   11, 869. 66 _-..........

Total expended ...........--
               -                         -------   -    6, 069. 06   40, 676.89      _.------        11, 869. 66 ....

Allotted-..-------.   ----.----     --------.----      35,000. 00    -4, 000. 00    ------------     11, 241. 16       $43, 000


Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934--------------------------------------------                      $43,000
Balance unexpended June 30, 1934 ----------       ___      --------------------  43, 000

                             20. FIVEMILE RIVER HARBOR, CONN.
  Location.-On the north shore of Long Island Sound about 41
miles to the east of New York City. (See U. S. Coast and Geodetic
Survey Chart No. 221.)
  Existing project.-This provides for a channel 8 feet deep, 100
feet wide, and 6,000 feet long. The plane of reference is mean low
water, the mean tidal range being 7.2 feet and the extreme range,
due to the effects of wind and other causes, 12 feet or more. The
estimate of cost for new work revised in 1928 is $46,000. The latest
(1894) approved estimate for annual cost of maintenance is $1,000.
The existing project was adopted by the River and Harbor Act of
August 11, 1888 (Annual Report for 1887, p. 639; for map, see H.
Doc. No. 1419, 63d Cong., 3d sess.).
         RIVERS AND     HARBORS-PROVIDENCE,          R.   I.,   DISTRICT          97
   Terminal facilities.--There are several small- wharves and piers.
Thefacilities are adequate for the existing commerce.
   ReCommended mdi   b   ea tio s of project.--Under date of Depei-
her 15, 1914, the Chief of Engineers recommended that the project
be modified to omit all work above a point 3,800 feet from the inner
end of the entrance channel (H. Doc. No. 1419. 63d Cong., 3d sess.).
   Operations and results during fiscal year.--None.
   Condition at end of fiscal year.-The existing project is 77 percent
completed. A channel of project dimensions has been dredged about
5,300 feet up the harbor and thence 200 feet farther with widths of
25 to 75 feet. The head of navigation is about 1 mile above the
mouth. The controlling depths as determined in 1934 are 61/2 feet
over the outer bar, thence in the river 11 to 15 feet to opposite Butler
Island Creek; thence along the wharves 7 feet, diminishing to 4 or 5
feet at the upper wharf. To complete the project requires the com-
pletion of the upper 700 feet of channel. The costs and expenditures
have been $35,490.44 for new work and $10,846.65 for maintenance, a
total of $46,337.09.
   Proposed operations.-There were no funds available at the close
of the year and no work is contemplated during the fiscal year 1935.
   The sum of $3,000 can be profitably expended during the fiscal
year 1936 in removing by contract July 1935 about 5,000 cubic yards
from the shoal at the entrance to the river.
                         Cost and financial summary

Cost of new work to June 30, 1934-------------------------------$35,     490. 44
Cost of maintenance to June 30, 1934----------------------------     10, 846. 65
      Total cost of permanent work to June 30, 1934--------------      46, 337.09
Net total expenditures ------   --                                     46---------------------------
                                                                       4,  337. 09
Total amount appropriated to June 30, 1934-------------------          46, 337.09

Amount (estimated) required to be appropriated for completion of
existing project__-- __ ______-____--__         __-__-------              9, 500.00

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance-----------------------------------              .3, 000. 00

                     21. STAMFORD HARBOR, CONN.

   Location.-On the north shore of Long Island Sound, 36 miles
east of New York City. (See U. S. Coast and Geodetic Survey
Chart No. 221.)
   Previous projects.-Adopted by the acts of August 5, 1886, and
July 13, 1892. The cost and expenditures on these projects were
$135,142.85 for new work and $59,419.99 for maintenance, a total of
$194,562.84. For further details see page 1758 of Annual Report
for 1915.
   Existing project.-This provides for an entrance channel 12 feet
deep, 200 feet wide, and about 0.6 mile long; a channel in the east
branch 12 feet deep and 100 feet wide, with increased width at the
turns, to a point 1,100 feet from the head of navigation, thence of
the same depth and from 85 to 125 feet wide to the head of naviga-
tion, a total distance of about 1.5 miles; a channel in the west 'branch
9 feet deep, 100 feet wide, and about three-fourths mile long, and a
basin of the same depth and 200 feet wide at the head of the branch.
The plane of reference is .mean low water, the mean tidal range being
9S      REPORT OF CHIEF OF ENGINEERS,                   U.   S.   ARMY,   1934


7.3 feet. The extreme tidal range, due to the combined effects of
wind and other causes, is 12 feet or more. The estimate of cost for
new work, revised in 1928, is $205,000, exclusive of amounts expended
on previous projects. The latest (1932) approved estimate for
annual cost of maintenance is $10,000.
   The existing project was adopted by the River and Harbor Act of
March 2, 1919 (H. Doc. No. 1130, 63d Cong., 2d sess.). For the
latest published map see the project document.
   Local cooperation.-Fully complied with.
   Terminal facilities.--The total length of berthing space available
is 6,015 feet. The facilities are considered adequate for the exist-
ing commerce. (For further details see Port Series No. 18, Corps
of Engineers.)
   Operations and results during fiscal year.-Using hired labor
and Government plant, 262.81 cubic yards of boulders and rock
fragments were removed from the channel edges. Work was begun
in the West Branch on May 17, 1934, and was in progress in the East
Branch at the close of the fiscal year. The costs were $8,840.39,
applied to maintenance, and the expenditures $5,378.01.
   Condition at end of fiscal year.-The project is practically com-
pleted. The entrance channel and the West Branch Channel and
Basin have been completed, and the East Branch Channel has been
completed except for a slight deficiency in width in the turn oppo-
site Ludlow Street. On June 30, 1934, the controlling depths at
mean low water were: In the entrance channel, 12 feet; in the East
Branch, 11 feet; in the West Branch, nearly 12 feet to the basin;
and in the basin, 8 to 10 feet. To complete the project requires a
slight widening (not essential to navigation) in the channel oppo-
site Ludlow Street. Costs have been $188 414.94 for new work and
$107,964.42 for maintenance, a total of $296,379.36, and the total
expenditures $292,916.98.
   Proposed operations.-It is proposed to apply the funds unex-
pended on June 30, 1934, amounting to $4,618.01, as follows:
Accounts payable June 30, 1934--------------------------------$3,                  462. 38
Removal of boulders by Government plant and hired labor, in prog-
  ress, to be completed in July 1934--------------------_                        1, 155. 63
      Total -        ---       --        ------------                            4, 618. 01

  No funds can be profitably expended during the fiscal year 1936
as the channels are in satisfactory condition to meet the needs of
navigation through that period.
                                    Cost and financial surrmary

Cost of new work to June 30, 1934_------------------------                  $323, 557. 79
Cost of maintenance to June 30, 1934----------------------_                  167, 384. 41
     Total cost of permanent work to June 30, 1934__________  490, 942. 20
Minus accounts payable June 30, 1934-------------------------   3, 462. 38
     Net total expenditures_ ------------------------------ _                487, 479. 82
Unexpended balance June 30, 1934_ ___          ___                             4, 618. 01
      Total amount appropriated to June 30, 1934-------------_               492, 097. 83
               RIVERS         AND HARBORS-PROVIDENCE,                                        R.     I.,     DISTRICT                     99

           Fiscal year ending June 30                         1930              1931           1932                1933           1934

Cost of new work---------------                         ------------------          ------                  -                   --------
Cost of maintenance ___$25,                                                                       545. 62       $34, 695. 66    $8, 840. 39

Total expended-_____________________           ______-_                         $311. 45     25, 736. 14         34,193.69        5,378.01
Allotted_-__-----34,                                                             500.00     -6,000. 0031, 741.228                 9, 996. 02


Amount allotted from War Department Appropriation Act approved
  July 14, 1932___                                                   000.,00
                                                                 $-------------------
Deductions on account of revocation of allotment----------------    -3. 98

      Net amount to be accounted for----------------------------                                                               9, 996. 02
Gross amount expended -----------------------------------------                                                                5, 378. 01

      Balance unexpended June 30, 1934 -------------------------                                                               4, 618.,01
Outstanding liabilities June 30, 1934-----------------------------                                                             4, 618.01

        Amount (estimated) required        to be al:p. opriated for com-
                               - -- --- -- -- --- --- -
   pletion of existing project 1      __                                 16, 500. 00

       22. EXAMINATIONS, SURVEYS, AND CO NTINGENCIES (GENERAL)

  The cost of work during the year amounted to $17,832.80.; the
expenditures were $19,338.01. The balance unexpended and a~aeounts
receivable on June 30, 1934, amounting to $26,594.12, will be applied
as needed during the fiscal year 1935 to pay nent of expenses incurred
in connection with the above items. The, additional sum of $24,000
can be profitably expended during the fiscal year ending June 30,
1936.
                                          Cost and financial summary
Cost of maintenance to June 30, 1934--------------------------$119,    746. 71
Value of plant, materials, etc., on hand June 30, 1934     --   -  -1, 654. 05
      Net total cost to June 30, 1934----------------------------                                                          118, 092. 66
Plus accounts receivable.June 30, 1934--------------------------                                                             4, 288. 67
     Gross total costs to June 30, 1934                             381. 33
                                                              1-------------------------22,
Minus accounts payable June 30, 1934---------------------------1, 721. 17

     Net total expenditures------------------                                                                              120, 660. 16
Unexpended balance June 30, 1934-------------------------_                                                                  22, 305. 45
           Total amount appropriated to June 30, 1934                                                                            965 .61
                                                                                                                           1---------------42,

           Fiscal year ending June 30                         1930              1931              1932              1933          1534


Cost of new work .__________.__..___
Cost of maintenance_...-.. -$17, _-..... ......                512. 44       $15, 670. 96   $38, 513. 21        $17, 427. 20    $17, 832. 80
Total expended_---- ---------
                          ____                ----___     16, 363. 59         15, 577. 00    38, 940. 34         14, 355. 50     19, 338. 01
Allotted       -----------------..................        16, 000. 00         21, 000. 00    21, 000. 00         29, 897. 01     25, 568. 60
   1
       Exclusive of available funds.
100             REPORT         OF CHIEF OF               ENGINEERS, U.                         S. ARMY,                  1934

Balance unexpended July 1, 1933---------------------------                                                                    $16. 074. 86
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934------------------------ $10,000.                                                            00
Amount allotted from War Department Appropriation
  Act approved July 14, 1932-------------------------        297.                                                        5:
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933- -----------------------     10, 236.                                                        16
Amount allotted from War Department Appropriation
  Act approved May 28, 1930----            ---- -------.  ------
                                                             224.                                                        65
                                                                                                                               2R 758 40
                                                                                                                               c.",      v         .




Amount to be accounted for----------------------                                               ---------                -     42, 833. 26
.Deductions on account of revocation of allotment_                                                  -__--__                      1, 189.80

       Net amount to be accounted for         _-------                                                                         41, 643.46
Gross amount expended_____  ---------------------                                                  39, 931. 53
Less :
    :Reimbursements collected _________- $20, 577. 97
     Receipts from sales-_________------_            15. 55
                                                                                                    20, 593. 52
                                                                                                                               19, 338. 01

             Balance       unexpended           June 30.          1934___ _______--------_                                    22, 305. 45
Outstanding liabilities June 30, 1934___________________                                                            __           4, 270. 89

      Balance available June 30, 1934_______________-----_-----                                                                18, 034. 56
Accounts receivable June 30, 1934   -----------------                                                                           4, 288. 67

     Unobligated balance available June 30, 1934_______________                                                                22, 323.23
Amount that can be profitably expended in fiscal year ending June
       30, 1936, for maintenancea ________________-_                                                             ___           24",000. 00

                    23. Other projects for which no estimates are submitted
                         [Commercial statistics for these projects are given in pt. 2 of report]

                                                                                        Cost and expenditures to
                                                                          For last            June 30, 1934      Estimated
                        Name of project                                 full report                              amount re-
                                                                        see annual                                quired to
                                                                        report for-      New work       Mainte-   complete
                                                                                                         nance
                                                                    i                 i--~-I


1.    Marthas Vineyard (Edgartown -Harbor),
                                       - - - - - - - - Mass.'
                                                         - - - -_          1897            $30, 000. 00                                      (2)
2..   Vineyard Haven Harbor,    Mass. _                                   1909             55,387. 35                                       (2)
                             1
3.    Newport Harbor, R. I.                                               1924            680, 025. 52    $24, 229. 79                      (2)
4.    Warren River, R. I.1                                                1890              5, 000. 00   ............                       (2)
5.    Wickford Harbor, R. I.1_'                                           1900             16, 300. 00                                      (2)
6.    Harbor of Refuge at Point Judith, R. I.3 .........                  1929         2, 371, 467. 55    463, 208. 73                      (2)
7.    Great Salt Pond, Block Island, R. I.1'                              1924            189, 036. 65     24, 173. 03                  $116, 000
8.    Pawcatuck River, R. I. and Conn.' 4                                 1933            182, 835. 11    119, 553. 93                     64, 600
9.    Stonington Harbor, Conn.' 3_                                        1919            337, 453. 83      6, 000. 00                      2, 500
10.    Mystic River, Conn.1 .____________..--------                        1919             48, 125. 50         134. 50                      2, 500
11.    Connecticut River above Hartford, Conn.5 .. __                      1932            116, 324. 81     14, 373. 54               6 1, 000, 000
12.    Southport Harbor, Conn. 1 3     River. Conn.'                       1930             59, 213.03       8,931.91                        (2)
13.    Westport Harbor and Saugatuck River, Conn.l__                       1927             32, 104. 55      3, 360. 44                            2, 800
14.    Cos Cob Harbor and Mianus River, Conn.
                                                       7
                                                          .....            1904             18, 935. 19          64. 81                      (2)
15.    Greenwich Harbor, Conn.l.                                           1932           854, 312. 64      43, 169. 90                      (2)
16.    Hay (West) Harbor, N. Y.1                                           1931              8, 401. 15                                      (2)


   1 Channels adequate for commerce.
   2 Completed.
   3 Maintenance of breakwaters not urgent.
   4 Revoked during fiscal year $5,729.01, and maintenance costs reduced $4.46 account corrections to inspec-
tion expenses.
   5 Awaiting local cooperation. Modification of conditions affecting lock and dam construction at Enfield
Rapids is recommended in H. Doc. No. 27, 73d Cong., 1st sess.
   6 Estimated cost of existing project, $3,384,000; expenditure limited by law to $1,000,000.
   7 Abandonment approved in 1905.
   8 Revoked during fiscal year 1933, $1,017.34.

       a Exclusive of available funds.
            RIVERS AND HARBORS-FIRST NEW YORK, N.                                        Y., DISTRICT          101
Status of reports called for by river and harbor acts and committee resolutions


           Locality          Authorization act      Transmitted
                                                    to Congress           Document no.                Recommenda-
                                                                                                      Recomenda-


Connecticut      River,     Flood   Control   Act
Mass.       (Preliminary    June 13, 1934.
examination for flood
control and bank ero-
sion.)
Fivemile River Harbor,      Rivers and Harbors -
  Conn.                      Committee resolu-
                             tion, Jan. 29, 1934.
Nantucket        Harbor, Rivers and Harbors
Mass.                     Committee resolu-
                              tion, Jan. 5, 1934.
New: 'Bedford     Harbor,   Rivers and Harbors
 -'Mass.                     Committee resolu-
                             tion, Feb. 27, 1934.
New London Harbor,          Rivers and Harbors      Mar. 7,1934     .........--------------------.. Unfavorable.
  Conn.                       Committee resolu-
                          tion, June 14, 1933.
Pawcatuck River, R. I__ Rivers and Harbors          Feb. 23, 1934   ...---..------------------.....      Do.
                              Committee resolu-
                              tion, May 24, 1932.
Southport        Harbor,    Rivers and Harbors
  Conn.                       Committee resolu-
                             tion, Mar. 29, 1934.
Stamford         Harbor, Rivers and Harbors
  Conn.                    Committee resolu-
                             tion, Jan. 29,1934.
Thames River, Conn.,        Rivers and Harbors .
improvement below            Committee resolu-
Allyn's Point.              tion, June 15, 1934.
Thames River, Conn.,        Rivers and Harbors
deepening channel to         Committee resolu-
22 feet from Allyn's        tion, Feb. 27, 1934.
Point to Norwich.


IMPROVEMENT OF RIVERS AND HARBORS                                                                     IN THE
        FIRST NEW YORK, N. Y., DISTRICT

  This district includes all of the principal channels and anchorages
of the greater part of the Lower and Upper Bays, New York Har-
bor, from the Battery, New York City, to the Atlantic Ocean; the
rivers and harbors of Long Island, N. Y., Long Island Sound, and
the rivers and harbors on its northern shore west of the Connecticut
boundary line; East River from the head of Long Island Sound at
Throgs Neck to the Battery, New York City, including its tributaries
from the north; Hudson River and tributaries to the head of navi-
gation about 250 miles north from the Battery; and Lake Cham-
plain and tributaries from Whitehall, N. Y., to the Canadian border.
  District engineer: Col. G. R. Lukesh, Corps of Engineers.
  Division engineer: Col. G. M. Hoffman, Corps of Engineers.
102       REPORT OF CHIEF       OF ENGINEERS,          U.   S. ARMY,    1934

                                     IMPROVEMENTS

                                      Page                                     Page
1.   Port Chester Harbor, N. Y__      102   17. Buttermilk Channel, N. Y_-    139
2.   Mamaroneck Harbor, N. Y__        104   18. Gowanus Creek Channel,
3.   New Rochelle Harbor, N. Y_       105         N. Y_      __               143
4.   Westchester Creek, N. Y ____     106   19. East River, N. Y     --       144
5.   Bronx River, N. Y_               107   20. Newtown Creek, N. Y --        152
6.   Harbor at Flushing Bay,                21. Harlem River, N. Y __----     155
       N. Y _________                  109   22. Hudson River Channel, N. Y_   157
7.   Hempstead Harbor, N. Y___        111   23. New York Harbor: Collec-
8.   Glencove Creek, N. Y    -        112                       .   ..
                                                   tion of drift_________       165
9.   Huntington Harbor, N. Y__-       115   24. Tarrytown Harbor, N. Y___      167
10.   Great South Bay, N. Y ___        117   25. Peekskill Harbor, N. Y ____    169
11.   Browns Creek, N. Y .___.         118   26. Wappinger Creek, N. Y ____     170
12.   East Rockaway (Debs) in-               27. Rondout Harbor, N. Y --        171
        let, N. Y-___                  120   28. Saugerties Harbor, N. Y __     173
13. Jamaica Bay, N. Y ________         125   29. Hudson River, N. Y________     174
14. New York Harbor : Am-                    30. Operating and care of lock
      brose, Main Ship, Bayside,                   and dam in Hudson River
      and Gedney Channels, in-                      at Troy, N. Y- -_ _---      182
      cluding Anchorage Chan-                31. Narrows of Lake Cham-
      nel and Craven Shoal and                    plain, N. Y. and Vt- ....    183
      channel between Staten                 32. Burlington Harbor, Vt __..    186
      Island and Hoffman and                 33. Examinations, surveys, and
      Swinburne Islands, N. Y_         128        con; ingencies (general) -    187
15. Coney Island Channel, N. Y_        133   34. Other projects for which no
16. Bay Ridge and Red Hook                         estimates are submitted__    188
      Channels, N. Y__      ____       134

                      1. PORT CHESTER HARBOR, N. Y.

   Location.-This harbor is located at the boundary between the
States of New York and Connecticut, and about 32 miles by water
east of the Battery, New York City. (See U. S. Coast and Geodetic
Survey Chart No. 222.)
   Previous projects.-Adopted by acts approved June 10, 1872,
March 3, 1899, and March 2, 1907. The cost and expenditures were
$74,995.10 for new work and $16,369.12 for maintenance, a total of
$91,364.22. For further details see Annual Report for 1915, page 1758.
   Ewisting project.-This provides for an anchorage basin near the
breakwater, 12 feet deep, for fenders on the east bank opposite the
southern end of Fox Island, and for a channel 12 feet deep at mean
low water and 150 feet wide from Long Island Sound to the mouth
of the river at the southerly point of Fox Island; thence 10 feet
deep and 100 feet wide to 900 feet below the fixed bridge at Mill
Street in Port Chester, including a turning basin opposite the steam-
boat landing; and thence 3 feet deep and 175 to 100 feet wide to
100 feet below the fixed bridge. The length of the section included
in the project is about 15/ miles. Mean tidal range, 7.1 feet; mean
range of spring tides, 8.4 feet; irregular fluctuations due to wind
and barometric pressure vary from 4 feet below mean low water up
to 4.5 feet above mean high water.
   The estimate of cost for new work, revised in 1930, is $454,000,
exclusive of amounts expended on previous projects, of which $5,500
is to be contributed by local interests. The latest (1927) approved
estimate for annual cost of maintenance after completion is $3,000.
   The existing project was adopted by the River and Harbor Act of
June 25, 1910 (H. Doc. No. 1165, 60th Cong., 2d sess.), and modified
           RIVERS AND HARBORS-FIRST NEW YORK, N.                                                    Y.1 DISTRICT           103

by the River and Harbor Act of July 3, 1930 (Rivers and Harbors
Committee Doc. No. 23, 70th Cong., 2d sess.), the latter act providing
for widening the turning basin, for an anchorage basin, and for
fenders on the east bank. The latest published maps are in the
project documents.
   Local cooperation.-The River and Harbor Act of July 3, 1930,
provides that local interests shall contribute $5,500 in cash toward
widening the channel at the turning basin. This condition has not
been complied with.
   Terminal facilities.-Water terminals, 24 in number, with avail-
able dockage of 3,697 feet, are located on Byram River at and be-
tween Fox Island and the fixed bridge. The existing facilities appear
to be adequate for existing commerce.        (For further details see
Annual Report for 1932, p. 149.)
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-About 75 percent of the existing
project has been completed. The work remaining to be done under
the existing project consists in the removal of scattered rock shoals,
widening the turning basin, and constructing fenders on the bank
opposite the southern end of Fox Island. When examined in May
1931, May-June and September 1932, and June 1933 the controlling
mean low-water depth was 12 feet for a width of 150 feet from Long
Island Sound to Byram Point just below Fox Island; the anchorage
basin is 12 feet deep; thence to 400 feet north of Purdy Avenue the
depth was 10 feet for a width varying from 100 to 50 feet; to the
turning basin 50 feet wide and 9.5 feet deep; in the turning basin it
is about 10 feet deep, and to the head of the improvement it is about
3 feet deep and 50 feet wide. The total costs and expenditures have
been $400,080.11-$341,669.02 for new work and $58,411.09 for
maintenance.
   Proposed operations.-An allotment of $10,000 made during July
1934 will be applied in maintenance dredging by contract (Septem-
ber 1934) to restore project depth in the project channel from Purdy
Grove to the upper limit of the turning basin.
   It is believed that no additional maintenance dredging throughout
the project channel will be necessary during the next 2 years, and
therefore no additional funds can be profitably expended during the
fiscal year 1936.
                                           Cost and financial summary
Cost of new work to June 30, 1934_ _  .      --                                                                   $413, 886. 23
Cost of maintenance to June 30, 1934________________________                                                        77, 558. 09
      Total cost of permanent work to June 30, 1934__________                                                     491, 444. 32
Net total expenditures                                                                                            491, 444. 32
Total amount appropriated to June 30, 1934____________________                                                    491, 444. 32

          Fiscal year ending June 30                          1930          1931            1932           1933          1934

                   ------------------
Cost of new work_______
                  ...   .                                                   $433.42      $15, 457. 15    $10,430. 07 ...........
Cost of maintenance -------------------                     $4, 147. 63      437. 78        2, 880. 35     9, 836. 98 ............
       Total cost_-----------------------                    4, 147. 63      871. 20      18, 337. 50    20, 267. 05 _
Total expended----.-----                                     4,105. 96       846. 17      18,170.17      20, 501. 07

Allotted--...................----------------------------         ______--------------    44, 588. 43 -10,244.11.
104     REPORT OF CHIEF OF ENGINEERS,                U.   S. ARMY,   1934

Amount allotted from War Department Appropriation Act approved
Mar. 4, 1933_-------------------------------------------------- $10, 000
Balance unexpended June 30, 1934-___                                        10, 000

Amount (estimated)      required to be appropriated for completion of
  existing project 1               --      -    --                          17, 500

                       2. MAMARONECK HARBOR, N. Y.
    Location.-This harbor is situated on the north shore of Long
Island Sound, 5 miles west of the Connecticut State line, and 27 miles
by water east of the Battery, New York City. (See U. S. Coast and
Geodetic Survey Chart No. 222.)
   Previous projects.-Adopted by acts of August 2, 1882, and July
25, 1912. The total cost and expenditures were $94,139.29-$80,-
724.43 for new work and $13,414.86 for maintenance. For further
details see Annual Reports for 1915 and 1924, pages 1759 and 141,
respectively.
   Existing project.-This provides for an anchorage area near the
head of navigation and for a channel 10 feet deep at mean low water
and 100 feet bottom width from deep water in Long Island Sound to
Orienta Point, and thence 80 feet bottom width following the lines
of the project adopted by the River and Harbor Act of July 25, 1912
 (H. Doc. No. 1087, 61st Cong., 3d sess.), to a point about 150 feet
below the Boston Post Road, with an extension having the same
bottom width 300 feet northeast of the main channel, with widening
at bends. Length of section included in project, 11/4 miles. Mean
tidal range, 7.1 feet; mean range of spring tides, 8.4 feet; irregular
fluctuations due to wind and barometric pressure vary from 4 feet
below mean low water up to 4.5 feet above mean high water.
    Estimated cost for new work, made in 1919, was $103,000, exclusive
of amounts expended on previous projects; estimated cost of annual
maintenance, made in 1919, $1,000.
    The existing project was adopted by the River and Harbor Act of
September 22, 1922 (H. Doc. No. 651, 66th Cong., 2d sess.). The
latest published map is printed in House Document No. 1087, Sixty-
first Congress, third session.
    Local cooperation.-Fully complied with.
    Terminal facilities.-Waterterminals, five in number, with a total
available dockage of 1,200 linear feet, are located near the head of
navigation. These facilities afford ample accommodation for pres-
ent and immediately prospective requirements of commerce. (For
further details see Annual Report for 1932, p. 152.)
    Operations and results during fiscal year.-None.
    Condition at end of fiscal year.-The project was completed in
1933. The controlling mean low-water depth when examined in
May 1934 was 10 feet throughout the adopted channel length, vary-
ing from 100 feet in width at the entrance in Long Island Sound
to 80 feet wide elsewhere with the exception of a 1,200-foot stretch
off Orienta Point where the depth is 9 feet. The depth in the anchor-
age area is 8 feet. The total cost of the existing project to June 30,
1934, was $135,593.01-$107,951.78 for new work and $27,641.23 for
maintenance. The expenditures were $135,563.59.
    Proposed operations.-The balance unexpended at the end of the
fiscal year amounting to $6,000 will be applied in the payment of
  1Exclusive of available funds.
           RIVERS AND HARBORS-FIRST NEW YORK, N.                                        Y., DISTRICT               105

accounts payable June 30, 1934, amounting to $29.42, and in main-
tenance dredging by contract (August-September 1934) in the pro-
ject channel opposite Orienta Point.
  It is believed that further maintenance dredging will not be
necessary during the next 2 years. Therefore no additional funds
can be profitably expended during the fiscal year ending June 30,
1936.
                                               Cost and financial summary

Cost of new work to June 30, 1934-..-__                                                                $188, 676. 21
Cost of maintenance to June 30, 1934-----------------------                                              41, 056. 09
      Total cost of permanent work to June 30, 1934              229, 732. 30 -------------
Minus accounts payable June 30, 1934----------------------------       29.42

     Net total expenditures ----------------------------                                                229, 702.188
Unexpended balance June 30, 1934-------------------------                                                 6,000. 00

           Total amount appropriated to June 30, 1934--------------- 235, 702.:88

          Fiscal year ending June 30                       1930   1961           1932           1933             1934


Cost of new work ...--------------------------  ------------                   $1, 538. 27   $29, 002. 88 .
Cost of maintenance------ ------------------------    $505.14                       46. 21
       Total cost---------- ----------------------------          505. 14       1, 584. 48    29, 002. 88 ------------
Total expended        ----------------------------------          484.   68     1, 604. 94   29, 002. 88    .

Allotted------------------------------                                        -1, 700. 00    29, 045. 27        $5, 957. 61


Balance unexpended July 1, 1933-------------------------------                                                  $42. 39
Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934--_----------------    ----- --------- -------   ------                                       , 00000 00
      Amount to be accounted for__-------------------------                                                6, 042.39
Deductions on account of revocation of allotment   -------                                                     42. 39
          Net amount to be accounted for                                                                      000. 00
                                                                                                           6----------------------,

Balance unexpended June 30, 1934     ---------------------------                                           6, 000,00
Outstanding liabilities June 30, 1934--                                                                        29. 42

          Balance available June 30, 1934----------------------                                            5,970, 58

                                  3. NEW ROCHELLE HARBOR, N. Y.

   Location.-This harbor is situated on the north shore of Long
Island Sound, 9 miles west of the Connecticut State line and 23
miles by water east of the Battery, New York City. (See U. S.
Coast and Geodetic Survey Chart No. 222.)
   Previous projects.-Adopted by act of March 3, 1881. The total
cost and expenditures were $43,174.79, all for new work. For
further details see Annual Report for 1932, page 157.
   Existing project.-This provides for a channel 8 feet deep at mean
low water, 120 feet wide, and about 3,400 feet long, extending from
the deep-water channel between Glen Island and Davenport Neck
up to a point about 300 feet below a dam at the head of navigation
in the vicinity of Leland Avenue, New Rochelle, N. Y. Mean tidal
range 7.1 feet; mean range of spring tides, 8.4 feet; irregular fluctu-
  1After adding $29.42 to adjust amount reported in 1933 Annual Report,
106           REPORT OF CHIEF OF ENGINEERS,                                          U.      S. ARMY,              1934


ations due to wind and barometric pressure vary from 4 feet below
mean low water up to 4.5 feet above mean high water.
    Estimated cost for new work, made in 1921, was $35,000, exclusive
of amounts expended on previous projects. Estimated cost of annual
maintenance, made in 1921, $1,000.
    The existing project was adopted by the river and harbor act of
September 22, 1922 (H. Doc. No. 110, 67th Cong., 1st sess.). The
latest published map is in the project document.
    Local cooperation.-Fully complied with.
    Terminanl faciities.-Water terminals, eight in number, with
,available dockage of 1,200 feet, are located parallel to the channel.
These facilities afford ample accommodation for present and imme-
diately prospective requirements of commerce. (For further details
see Annual Report for 1932, p. 158.)
    Operations and results diurng fiscal yea.-None.
    Condition at end of fiscal year.-The existing project was coim-
pleted in 1924 at a saving of $4,961 under the estimated cost.
    When examined in May 1934 the project depth of 8 feet existed
for the full length of the channel. The width was as follows: 120
feet from the entrance upstream for a distance of about 700 feet
and 50 to 90 feet to the head of the improvement, a distance of
about 2,700 feet. The total cost of the existing project up to June
30, 1934, was $38,800-$30,038.88 for new work and $8,761.12 for
maintenance. The total expenditures amounted to $38,800.
   Proposed operations.-There are no funds available and no work
proposed during 1935.
   It is believed that further dredging for maintenance will be neces-
sary to restore the channel to project dimensions during the next
2 years.. There:fore, the sum of $4,000 can be profitably expended
during the fiscal year ending June 30, 1936, in maintenance dredging
under contract during September 1935.
                                        Cost and financial summary

Cost of new: work to June 30, 1934-------------------------$73, 213.67
Cost of maintenance to June 30, 1934-------------------------8, 761. 12

      Total cost of permanent work to June 30, 1934-------------81, 974. 79
Net total expenditures__----_---_   -----------------------      81, 974. 79
Total amount appropriated to June 30, 1934--------------------81, 974. 79


          Fiscal year ending June 30                       1930              1931              1932               1933      1934

Cost of new work ---------
                     _--------------                                    ---------------------------------------
Cost of maintenance--------------                ----------------           $159.19         $8, 013. 99
Total expended ---          ----   -        --       ------------             159. 19         8,013. 99------------------
A llotted - _-----                     --               ---------   -      -------           8,000.00 -------             ----     --



Amount that can be profitably expended in fiscal year ending June 30,
                    -- ___________________
1936, for maintenance                                        _       $4, 000
                               4. WESTCHESTER CREEK, N. Y.

  The project was cosmpleted in May 1933 at a saving of $19,562
under the estimated cost. The expenditures during the year
amounted to $1,241.81, of which $13.76 was applied to payment of
           RIVERS AND HARBORS- -- FIRST NEW YORK, N.                                                Y., DISTRICT              107
outstanding liabilities at the beginning of the fiscal year, and $1,228.05
to cost (new work) involved in final payment, for the removal of 50
cubic yards of rock and 291 cubic yards of other material, placie
measurement, under a contract completed during the previous fiscal
year. The balance remaining at the end of the fiscal year was $0.61.
It is believed that dredging for maintenance will not be necessary
during the next 2 years. Therefore, no funds can be profitably ex-
pended during the fiscal year ending June 30, 1936.
  For last full report, see page 100, Annual Report for 1933..
                                             Cost and financial summary

Cost of new work to June 30, 1934 -------------------------                                                           $175, 848. 52
Cost of maintenance to June 30, 1934 __---            -________                                                         66, 632. 35
      Total cost of permanent work to June 30, 1934-------------                                                      242, 480. 87
Minus accounts payable June 30, 1934 ______-- ___ .    _____-.                                                                  61
     Net total expenditures ________________________
                                    -                                                               __                242, 480. 26
Unexpended balance June 30, 1934-                                                                                                61
                                                                                                                               ._____________
          Total amount appropriated to June 30, 1934 ......--..                                                       .242.480. 87

          Fiscal year ending June 30                         1930           1931             1932              1933         1934


Cost of new work__________.--------------                . .-------      $10, 738. 22    $69, 717. 04     $16, 982. 96     $1, 228. 05
Cost of maintenance________-___-         _____            $2, 680. 22         326. 66          .32.21
       Total cost.------------ ----------                   2, 680. 22    11,064. 88      69,749. 25       16,.982. 96      1, 228. 05
Total expended .____-------.......          .....
                                               __   ..     2,689. 48      10, 155. 61     40, 122. 42      49, 494. 17      .1,241. 81
Allotted___--           .......----------                212,350. 00 ..-------     ... -126,100.00        16, 025. 25       1, 225 62



Balance unexpended July 1, 1933-----------------------------$16.     80
Amount allotted from Emergency Relief and Construction Act ap-
proved July 21, 1932_--------------- ---------------------    , 500.00
     Amount to be accounted for --------------------                                                                     1,. 516. 80
Deductions on account of revocation of allotment -----------------                                                           274, 38
      Net amount to be accounted for _______--                                          ______-         ____             1, 242. 42
Gross amount expended-----------------------241.                                                                                 81
      Balance unexpended June 30, 1934 ---------------------------                                                                 .6
Outstanding liabilities June 30, 1934__ __________________________                                                                 .

                                            5. BRONX           RIVER, N. Y.

    Location.-This stream empties into a shallow bay, :1mile long
and 300 to 4,500 feet wide, in the north shore of East River, 11 miles
by water northeast of the Battery, New York City. (See U. S.
Coast and Geodetic Survey Chart No. 226.)
  Previous project.-Adopted by act of June 3, 1896.
  The total cost and expenditures were $95,957.05-$69,035.72 for
new work and $26,921.33 for maintenance. For further details see
Annual Report for 1915. page 1762.
  Existing project.-This provides for a channel 10 feet deep at mean
low water and a minimum bottom width of 100 feet, with widening
   1 After adding $0.61 to adjust amount reported in 1933 Annual:Report.
   2 After   adding $1,945.87 to adjust amount reported in 1933 Annual Report.
108    REPORT OF CHIEF OF ENGINEERS,       U. S.   ARMY,   1934


at the bends, to extend from deep water in East River to the head of
navigation at the, dam at East One Hundred and Seventy-seventh
Street, involving the first dredging from East River to Randall
Avenue to a width of 200 feet; thence to Spofford Avenue, 150 feet;
thence to Watson Avenue, 125 feet; thence to the railroad bridge
near Westchester Avenue, 100 feet, except in the southern approach
to ,the bridge, where it is to be 140 feet; and above the, bridge 100
feet, with increase at bends where permissible, including a turning
basin at the head of the improvement. It also provides for main-
taining the channel excavated under the project adopted June 3,
1896, until the channel provided for under the existing project is
open to traffic to the railroad bridge. The length of the section
included in the project is about 31/4 miles. Mean tidal range, 6.7
feet in the estuary; mean range of spring tides, 8 feet; irregular
fluctuations due to wind and barometric pressure vary from 4 feet
below mean low water up to 3.5 feet above mean high water.
   The estimate of cost for new work revised in 1928 is $2,700,000,
exclusive of the amounts expended on previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $7,500.
   The existing project was adopted by the River and Harbor Act of
March 4, 1913 (H. Doc. No. 897, 62d Cong., 2d sess.). For latest
published map see Annual Report for 1912, page 1470.
   Local cooperation.-Fullycomplied with.
   Terninal facilities.-Water terminals, 18 in number, with avail-
able dockage of 7,300 feet, are located-1 at the mouth, 17 along
the east and west banks for about 23/4 miles above the mouth to
the upper limits of the projected channel.
   Additional terminals with modern facilities will be needed when
the existing project is developed. (For further details see Port
Series No. 20, Corps of Engineers.)
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-About 29 percent of the project
has been completed. The channel provided for under the existing
project has been completed from deep water in East River up to
Westchester Avenue highway bridge; above this no work has been
done under the existing project pending the replacement of existing
bridge by a bridge suited to the conditions to be met when the
enlarged channel north of the bridge has been excavated. When
last examined in May 1934 the controlling mean low-water depth
from deep water in East River to Eastern Boulevard, a length of
about five-eighths mile, 10 feet deep, full width; to Ludlow Avenue
bridge, a length of about 1 mile, 10 feet deep, width varying from 50
to 80 feet; to Westchester Avenue bridge, 5 feet deep, and 50 feet
wide. The examination showed that the channel excavated under the
previous project was 50 to 30 feet wide and 5 feet deep from West-
chester Avenue up to about 500 feet above the New York, New
Haven & Hartford Railroad bridge above Westchester Avenue:
thence to about 500 feet below the dye works near the head of the
projected improvement the depth gradually reduces to zero. Above
this to the head of improvement the bottom is exposed at mean low
water and rises to an extreme height of about 4.5 feet above mean
low water just below the dam. To complete the project the channel
         RIVERS AND          HIARBORS-FIRST                NEW YORK, N.              Y., DISTRICT         109
above the Westchester Avenue highway bridge must be excavated to
project dimensions by dredging and rock removal.
  The total cost of the existing project up to June 30, 1934, was
$922,617.57-$797,803.65 for new work and $124,813.92 for mainte-
nance. The total expenditures amounted to $922,617.57.
  Proposed operations.-There are no funds available for this
project and no work is contemplated during the fiscal year 1935.
  The work necessary to carry the improvement above the Westches-
ter Avenue bridge has been deferred until the city of New York
shall have reconstructed the Westchester Avenue highway bridge
pending the replacement of the existing bridge by one suited to the
enlarged channel.
   It is believed that further dredging for maintenance will be neces-
sary during the next 2 years. Therefore, the sum of $20,000 can be
profitably expended during the fiscal year ending June 30, 1936, by
contract to restore the channel previously dredged from the East
River to the Westchester Avenue bridge to project dimensions.
                                     Cost and financiali summary

Cost of new work to June 30, 1934----------------------------- $866, 839. 37
Cost of maintenance to June 30, 1934---------------------------- 151, 735. 25
        Total cost of permanent work to June 30, 1934------------ 1, 018, 574. 62
Net total expenditures--------------------------------------      1, 018, 574. 62
.Total =amount appropriated to. June 30, 1934------------------- 1, 018, 574. 62


         Fiscal year ending June 30                1930          1931         1932         1933         1934


Cost of new work-----
Cost of maintenance---------
                            -- -----                      ---
                                         .-----------$88. 84 $27, 849. 87
                                                                                           --
                                                                                $62. 03 ------------ -------
Total expended       __--------__---_-----------     142. 21 27, 853. 15         72. 75 -----------------------
Allotted,                    --------------------- 30, 000. 00
               ....------------------                                       -2,399.24.......


Amount (estimated) required to be appropriated for completion
of existing project----------------------------------        $1,900, 000

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance-------------------------------------                                        20, 000
                           6. HARBOR AT FLUSHING BAY, N. Y.

   Location.-This stream empties into a shallow bay, 2 miles long
and 300 feet to 1.4 miles wide, in the south shore of East River, 12
miles by water northeast of the Battery, New York City. (See U. S.
Coast and Geodetic Survey Chart No. 226.)
   Previous projects.--Adopted by acts of March 3, 1879, and March
3, 1913. Cost and expenditures amounted to $3'58,981.33-$238,872.91
for new work and $120,108.42 for maintenance. For further details
see Annual Report for 1915, page 1772, and for 1932, page 169.
   Existing project.-This provides for a channel 12 feet deep at
mean low water and 200 feet wide from the 12-foot contour in East
River to the Broadway Bridge, thence 12 feet deep to the Main
Street Bridge, narrowing uniformly in width from 200 feet at the
Broadway Bridge to 160 feet at Main Street Bridge; and for the
110     REPORT OF CHIEF OF ENGINEERS,       U. S. ARMIY,   1934

construction of about 1,300 linear feet of new dike and repairs to
4,365 linear feet of old dike including the reconstruction of 1,600
  linear feet. Pending compliance by local interests with the condi-
tions imposed by Congress in adopting this project (see under Local
cooperation), available funds are being applied to maintenance of
the superseded project for a 10-foot depth up to Broadway Bridge,
and thence to Main Street Bridge a 7-foot depth. The length of
the section included in the project is about 15,000 feet-about 5,000
  feet in the creek and about 10,000 feet in the bay. Mean tidal range,
6.8 feet; mean range of spring tides, 8 feet; irregular fluctuations
due to wind and barometric pressure vary from 4 feet below mean
low water up to 3.5 feet above mean high water.
     The estimate of cost for new work, revised in 1928, is $365,000,
exclusive of amounts expended on previous projects. The latest
  (1923) approved estimate for annual cost of maintenance is $10,000.
     The existing project was authorized by the River and Harbor Act
approved March 3, 1925 (H. Doc. No. 124, 68th Cong., 1st sess.).
For latest published map see Annual Report for 1914, page 1746.
     Local cooperation.-The River and Harbor Act of March 3, 1925,
in adopting the enlarged project, requires that local interests will
dredge and maintain at their own expense, under plans to be ap-
proved by the Secretary of War, a channel 160 feet wide and 12 feet
deep at mean low water from Main Street Bridge to Meteor Street.
No steps have yet been taken to meet this condition. All prior
requirements have been complied with.
    Terminal facilities.-Water terminals, 17 in number, with avail-
able wharfage of 4,490 feet are located--15 along the east bank and 2
on the west bank-within the limits of the adopted project. The
facilities are considered adequate for existing commerce. (For fur-
ther details see Port Series No. 20, Corps of Engineers.)
     Operationsand results during fiscal year.-None.
    Condition at end of fiscal year.-The conditions prescribed by Con-
gress in adopting the existing project (see under Local cooperation)
have not yet been fulfilled; therefore no work had been done there-
under. When examined in February 1933 the controlling mean
low-water depth was 11 feet through a channel varying in 'width
from 200 to 100 feet, from the entrance in the East River up to the
north side of Broadway Bridge; thence through a channel 50 to
150 feet wide to 1,000 feet north of Main Street Bridge 10 feet;
thence to the head of improvement of the existing project (Main
Street Bridge) 8 feet through a channel 100 feet wide. No expendi-
tures have been made under the existing project.
    Proposed operations.-No funds are available and no work is con-
templated during the fiscal year 1935.
    It is believed that additional maintenance dredging will be nec-
essary during the next 2 years. Therefore, the sum of $40,000 can
be profitably expended during the fiscal year ending June 30, 1936,
by contract to restore the channel to the dimensions authorized under
the previous project at the mouth of the creek. It is not expected
that local cooperation will be complied with in time to permit of
undertaking new work on the project during the fiscal year 1936.
          RIVERS AND HARBORS-FIRST NEW YORK, N.                                        Y., DISTRICT               111

                                      Cost and financial summary

Cost of new work to June 30, 1934    ------------------------- $238, 872. 91
Cost of maintenance to June 30, 1934   ------------------------ 120, 108. 42

      Total cost of permanent work to June 30, 1934 ------------ 358, 981.33.
Net total expenditures--------------------------------           358, 981.33.
Total amount appropriated to June 30, 1934-------------------    358, 981.33.

         Fiscal year ending June 30                  1930         1931          1932            1933             1934


Cost of new work-------------.........................----------------------------------------------------
Cost of maintenance_------------------________   $15, 477. 02      $81. 35   $17, 820. 52
Total expended--- -------------------             16, 202. 82 _...-..-        17, 901. 87.........--------....----...
Allotted_         -----------------------------------------------20, 000. 00                -$5, 907. 34......


Amount (estimated) required to be appropriated for completion of
existing project ---   --------------------------------     $365, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30. 1936. for maintenance_                               40, 000. 00

                                      7. HEMPSTEAD HARBOR, N. Y.

   Location.--This is an indentation of the north shore of Long
Island, 25 miles by water northeast of the Battery, New York City,
and 13 miles southwest of Stamford Harbor, Conn. (See U. S.
Coast and Geodetic Survey Chart No. 223.)
   Existing project.-This provides for dredging a channel 6 feet
deep at mean low water and 100 feet wide from the entrance to a
point opposite Ward's Wharf, a distance of about 5,600 feet; thence
80 feet wide to the Roslyn Town Wharf, a distance of about 3,200
feet; and thence 50 to 70 feet wide to the head of navigation, a dis-
tance of about 1,700 feet. Total length of channel included in the
project is 2 miles. Mean tidal range, 7.1 feet; mean range of spring
tides, 8.4 feet; irregular fluctuations due to wind and barometric
pressure vary from 4 feet below mean low water up to 4.5 feet above
mean high water.
  The estimate of cost of new work, made in 1910, was $47,000.
The latest (1910) approved estimate for annual cost of maintenance
is $3,000.
   The existing project was adopted by the River and Harbor Act
of June 25, 1910 (Rivers and Harbors Committee Doc. No. 1, 61st
Cong., 2d sess.). There is no published map.
  Local cooperation.-Fully complied with.
  Termninal facilities.-Water terminals, 9 in number, with available
dockage of 2,700 feet, are located-8 along the east shore of the
harbor from Glen Cove to Roslyn and 1 on the west shore; none
has railroad connection. The facilities are adequate for existing
commerce, which is local, and there is ample water front, both public
and private for extensions as needs arise.
  Operations and results during fiscal year.-None.
  Condition at end of fiscal year.-The project was completed in
1913 at a saving of $7,532 under the estimated cost. The controlling
mean low-water depth, as shown by survey made in May 1933, was
          91536--ENG 1934--8
112       -REPORT OF CHIEF OF ENGINEERS,                    U. S.     ARMY,           1934

6 feet up to about 2,400 feet below the head of the improvement;
thence to the head 4 feet. The total costs and expenditures have
been $89,443.90-$39,468.11 for new work and $49,975.79 for
maintenance.
  Proposed operations.--No funds are available and no work is
proposed during the fiscal year 1935.
  The sum of $15,000 can be profitably expended during the fiscal
year ending June 30, 1936, in the removal of shoals from the chan-
nel near -,the 'head of navigation during the period August to
September 1935.
                                Cost and financial summ.ary

Cost of new work to June 30, 1934_____________________________ $39, 468.11
Cost of maintenance to June 30, 1934-----------------------49, 975. 79
      Total cost of permanent work to June 30, 1934-----------                                89,443. 90
Net total expenditures .-- ___------------_                                                   89, 443.90
Total amount appropriated to June 30, 1934______________________                              89, 443. 90

       Fiscal year ending June 30         1930       1931       1932               1933                1934

Cost of new work------------------------------------------             ------------------------
cost of maintenance----------------------- $22. 00 $200. 53     $42.96_____-_____                 _-____-____



    STotalexpended.------- ----------      22. 00 -------
                                                  ----176.71        66. 7
Allotted ....
           ..........

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance------------------------------------ $15, 000. 00
                              8. GLENCOVE CREEK, N. Y.

   Location.-This is a narrow tidal inlet extending eastwardly about
1 mile from the east side of Hempstead Harbor on the north shore
of Long Island, 26 miles northeast of the Battery, New York City.
 (See U. S. Coast and Geodetic Survey Chart No. 223.)
   Existing project.-This provides for a channel 100 feet wide and
8 feet ,deep at :mean low water from deep water in Hempstead Har-
bor, to the head of navigation at the city of Glen Cove, a total length
of about 5,000 feet, to be protected by a sand fence along its north
side where it crosses the beach. Mean tidal range, 7.1 feet; mean
range of spring tides, 8.4 feet; irregular fluctuations due to wind
and barometric pressure vary from 4 feet below mean low water up
to 4.5 feet above mean high water.
   The estimate of cost for new work (of which one-half is to be
borne by local interests, see Local cooperation), revised in 1934, is
$109,000, with $6,000 the first year and $4,000 annually thereafter
for maintenance.
   The existing project was adopted by the River and Harbor Act
of March 3, 1925. (H. Doc. No. 207, 68th Cong., 1st sess.) The
latest published map is in the project document.
   Local cooperation.-The River and Harbor Act of March 3, 1925,
provides that local interests shall pay one-half the first cost of the
work, provide without cost to the United States all rights-of-way,
spoil-disposal areas, and bulkheads, and give assurances, satisfactory
      RIVERS AND HARBORS-FIRST          NEW YORK, N.          Y., DISTRICT   113
to the Secretary of War, that adequate terminals will be built.
Complied with as to contribution of one-half of first cost of work
done to date or in progress, cession of rights-of-way, provision of
disposal areas, and the construction of terminals. Pending construc-
tion of bulkheads by local interests along the southerly side of the
channel in the upper 1,600 feet of they improvement, a channel of less
than project width has been excavated.
   Terminalfaeitties.-There are three terminals at present which
are adequate for present needs.
   Operations and results du +mfg fiscal year.-Under a contract for
dredging to a depth of 8 feet, work was commenced August 10, 1933,
and was completed May 28, 1934. There was removed a total of
196,509 cubic yards of material, place measurement; also the re-
mains of an old tide gate, sill and abutments, and old timbers, at a
total cost of $53,827.07 for new work.
   The United States gasoline tug Astoria was employed from June
4 to 24, 1934, in removing timbers from old bulkhead. The cost was
$1,117.80 for new work.
   The total cost was $54,944.87, all for new work, of which $12,300
were United States funds and $42,644.87 contributed and advanced
funds. In the final distribution of costs one-half of this amount
-will' be charged to United States funds and one-half to contributed
funds. The expenditures were' $53,321.60, of which $12,300 were
United States funds and $41,021.60 contributed and advanced funds.
   Condition at end of iscal year.-The project is about 50 percent
completed. The work done provided a channel 100 feet in width
from deep water in Hempstead Harbor for a distance of 3,470 feet,
thence gradually decreasing to, 50 feet in width for a distance of 180
feet, and 50 feet in width for a distance of about 1,450 feet to the
head of improvement. When examined in April-May 1934, the con-
trolling mean low water depth was 8 feet through a navigable chan-
nel varying from 100 feet wide at the mouth to 30 feet wide at the
head of improvement, except at a point 1,580 feet above the mouth
where it is 7.6 feet deep and 50 feet wide. The work remaining to
be done to complete the existing project consists in widening to 100
feet the upper 1,630 feet of channel and building a sand fence along
the north side of channel where it crosses the beach. The total cost
to June 30, 1934, was $54,944.87, all for new work. In the final dis-
tribution of costs one-half of this amount will be charged to United
States funds and one-half to contributed funds.
   The total expenditures were $53,321.60, of which $12,300 were
United States funds and $41,021.60 contributed and advanced funds.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $27,978.40, will be applied as follows:
Accounts payable June 30, 1934_____     ________________--_
                                            --                _    $1, 623.27
Refund to the city of Glen Cove, N. Y., the amount advanced to the
United States for new work on the adopted project ________--      19, 600. 00
New work: Operate United States derrick lighter E. R. 101 about
one-third month during August 1934 to remove large boulders from
the channel-------------------------------------------------       1,800.00
Balance remaining-                                  -   ---             4, 955. 13
     Total_      --  -
              - __________    ---- --
                          - _______-_         ___                      27,978.40
114        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY                                                         1934

  It is believed that maintenance dredging will be necessary to
restore the channel to project: dimensions during the next 2 years.
Therefore, the sum of $6,000 can be profitably expended in this
work during the fiscal year ending June 30, 1936, under contract.
                                   Cost and financial summary
                                          UNITE         STATEIS FNDS

Cost of new work to June 30, 1934_-------------------------_                                                     $30, 944. 87
Cost of maintenance to June 30, 1934 ....

      Total cost of permanent work to June 30, 1934-------------                                                     30, 944. 87
Minus accounts payable June 30, 1934-------------------------                                                         1, 623. 27
      Net total expenditures_________________-_______                                                                29, 321. 60
Unexpended balance June 30, 1934 __-    --- _____-______-__                                                          27, 978. 40
         Total amount appropriated and advanced to June 30, 1934__                                                   57, 300. 00

        Fiscal year ending June 30                    1930               1931              1932           1933           1934


Cost of new work....----------- -----           --------------------                ----------        ------------     $30,944. 87
Cost of maintenance-------          ---           ----------------------------
Total expended--------------------                   ---------------------------------------                            29, 321. 60

Allotted and advanced------------              -----------------------------------------                                57, 300. 00


Amount advanced by local interests, act of Mar. 3, 1925__________ $24, 000. 00
Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934-            ----------------------------            21, 000. 00
Amount allotted from War Department Appropriation Act approved
July 14, 1932     ------------------------------------------      12, 300. 00
      Amount to be accounted for_____-____----------                                                                 57,300. 00
Gross amount expended             -
                        _____-__-___--  -    -       -                                           __        -
                                                                                                         ___-        29, 321. 60
      Balance unexpended June 30, 1934 __ ______________                                                             27, 978. 40
Outstanding liabilities June 30, 1934 __  ______________ $974. 73
Amount covered by uncompleted contracts______________     648. 54
                                                                                                                      1,623. 27

        Balance available June 30, 1934__...                                        __         ______-----           26, 355. 13

Amount (estimated) required to be appropriated for completion
                    1
of existing project 2___________________________________                                                            21, 200. 00
Amount that can be profitably expended in fiscal year ending
                                            -
  June 1936,       for maintenance         1                   -----------                                __          6,000. 00

                                          CONTRIBUTED               FUNDS


Cost of new work to June 30, 1934 ________      _________--__ $24, 000. 00
Cost of maintenance to June 30, 1934____________    _______________

      Total cost of permanent work to June 30, 1934 ______-__                                                    24, 000. 00
Net total expenditures ___-----------__---------                                                                 24, 000. 00
Total amount contributed to June 30, 1934________                                                                24, 000. 00

  1 Exclusive of available funds.
  2 In addition to $26,100 to be contributed by local interests.
            RIVERS AND HARBORS--FIRST NEW YORK, N. Y., DISTRICT                                                                           115

           Fiscal year ending June 30                            1930             1931              1932              1933           1934


Cost of new work------------------------------------------------------------                                                             $24, 000
Cost of maintenance__
Total expended-- ---                     _
                               _ - -- --------------.                                        -24,           ..                               000
Contributed             -----------------
                   .-----------                         ------------------------ ----------- -------                         -            24, 000


Amount contributed, act of Mar. 4, 1915 ---------------------                                                                $24, 000. 00
Gross amount expended-----------------                                                                                        24, 000. 00
Amount (estimated) required to be contributed for completion of
existing project ----------------
                         --                                                                                                      26, 100. 00

        CONSOLIDATED COST AND FINANCIAL SUMMARY FOR GLENCCVE CIEE:K,                                                              . Y.

Cost of new work to June 30, 1934 -.....-                                                                                    $54, 944.87
Cost of maintenance to June 30, 1934_                                        ____________________                         __--              --

      Total cost of permanent work to June 30, 1934--                                                                            54, 944.87
Minus accounts payable June 30, 1934_-                                                                            -               1, 623. 27

     Net total expenditures --     -53,                        321. 60
Unexpended balance June 30, 1934---------------------------27, 978. 40

           Total amount contributed, advanced, and appropriated to
             June 30, 1934      _______________________-----------------------------------                                       81, 300. 00

           Fiscal year ending June 30                           1930              1931              1932              1933           1934


Cost of new work     .        .                                            - -            -I                 I                     $54, 944. 87
Cost of maintanence ..-------                                                    ---..
Total expended_ _               _-----------                                                                                        53, 321. 60
Allotted, contributed, and advanced--                                                               __- _                           81, 300. 00


Amount contributed and advanced___________________________     $48, 000. 00
Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934________________-----------------                 21, 000. 00
Amount allotted from War Department Appropriation Act approved
July 14, 1932_ ------------------------------------------      12, 300. 00

      Amount to be accounted for                                                 -----------                                     81, 300. 00
Gross amount expended------------------------                                                                                    53, 321.60

      Balance unexpended June 30, 1934-....                                                                                      27, 978. 40
Outstanding liabilities June 30, 1934____________________                                                        $974.73
Amount covered by uncompleted contracts______________                                                             648. 54
                                                                                                                                  1, 623.27

           Balance available June 30, 1934__                                             ----------                              26, 355. 13

Amount (estimated) required to be appropriated and contributed
for completion of existing project 1_--_           --                                                                           47, 300. 00

Amount that can be profitably expended in fiscal year ending June
    30, 1936, for maintenance --                        ----------------------                                                    6, 000.00

                                       9. HUNTINGTON HARBOR, N. Y.

   Location.-This is an indentation of the north shore of Long
Island, 40 miles northeast of the Battery, New York City, and 8
    1 Exclusive of available funds.
116     REPORT   OF CHIEF OF ENGINEERS,      U.   S. ARMY,   1934

miles southeast of Stamford Harbor, Conn. (See U. S. Coast and
Geodetic Survey Chart No. 224.)
    Previous project.-The project was adopted by the act of June
10, 1872. The cost and expenditures were $22,500. For further
details of previous projects see page 1772 of Annual Report for
1915.
    Existing project.-This provides for dredging a channel 8 feet
deep at mean low water and 100 feet wide from the 8-foot contour
in Huntington Bay about 1,100 feet north of Sandy Point on East
Neck to the Old Town Dock, with a turning basin 200 feet wide and
with a protecting dike on the west side if necessary. The length
of the section included in the project is about 9,100 feet. Mean tidal
range, 6.7 feet; mean range of spring tides, 8 feet; irregular fluctua-
tions due to wind and barometric pressure vary from 4 feet below
mean low water up to 3.5 feet above mean high water. The estimate
of cost for new work, made in 1885, was $32,000, exclusive of amounts
expended under previous projects. The latest (1928) approved
estimate for annual cost of maintenance is $2,000.
    The existing project was adopted by the River and Harbor Act of
September 19, 1890 (H. Ex. Doc. No. 200, 48th Cong., 2d sess.).
For latest published map see House Document No. 827, Sixty-first
Congress, second session.
    Terminal facilities.-There are six available wharves with a total
length of 1,200 feet. These terminals suffice the present commerce
of the harbor. For further details see page 191 of Annual Report
for 1931.
    Operations and results during fiscal year.-None.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1904 at a saving of $2,511 under the estimated cost. The
dike was never built, the purpose for which it was intended having
been covered by dredging to a greater width at the inner section
of the channel. The controlling mean low water depth as shown
by an examination made in July 1933, was 8 feet in the entrance at
Sandy Point; thence up to within 300 feet below the head of the
improvement, the channel is of project depth and width, except for
a 500-foot section just below Town-Park where the depth is reduced
to 7 feet and in the turning basin where the project depth prevails.
for a width of 130 feet; above this the depth becomes gradually less
and at the head it is but 4 feet and less. The total costs and expendi-
tures have been $65,032.20-$29, 489. 06 for new work and $35,543.14
for maintenance.
    Proposed operations.-The balance unexpended, at the end of the
fiscal year, amounting to $15,000, will be applied in maintenance
dredging by contract (August-September 1934) in the channel near
the head of navigation.
    It is believed that further maintenance dredging will not be neces-
sary during the next 2 years. Therefore, no funds can be profitably
expended during the fiscal year ending June 30, 1936.
           RIVERS AND HARBORS-FIRST                              NEW YORK, N. Y., DISTRICT                      117
                                        Cost and financial summary

Cost of new work to June 30, 1934------__ -------------------- $51, 989. 06:
Cost of maintenance to June 30, 1934------------------------ 35, 543. 14
           Total cost of permanent work to June 30, 1934-----------                                  87, 532. 20

Net total expenditures -------------------------------------                                         87, 532. 20
Unexpended balance June 30, 1934                                                                         000. 00
                                                                                                     1----------------------------
           Total amount appropriated to June 30, 1934_______________                              102, 532.20-

           Fiscal year ending June 30                 1930          1931      1932         1933            1934
Cost of new work __-------------------------------I
Cost of maintenance           . ..----------_-_------------
                                                  _._                  38
                                                                    $79.       $51. 55 ------              -
Total expended__ ... .-.---             .              $32. 08       49. 76     81. 17-                .
Allotted       -----               ,_                  --------------
                                              ------------ ------------ ----------        -$83. 99             $15, 000


Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934---__      ____                                    $15, 000. 00,
                                                              _-------------------------
Balance unexpended June 30, 1934__               ----       ___ 15,000. 00

                                  10. GREAT SOUTH BAY, N. Y.

   Location.-This is a lagoon inside the south shore of Long Island,.
N. Y., about 26 miles long and 2 to 6 miles wide. The principal
entrance, through Fire Island Inlet, is about 38 miles east of the-
entrance to New York Harbor and about 60 miles east of New York
City. (See U. S. Coast and Geodetic Survey Chart No. 578.)
   Previous projects.-Adopted by the River and Harbor Act of
September 19, 1890. The cost and expenditures were $40,000. The
records do not show how much of this was for maintenance. For
further details of previous projects see page 1773, Annual Report
for 1915.
   Existing project.-This provides for dredging a channel 200 feet
wide and 10 feet deep at mean low water from Fire Island Inlet to,
the central basin in Great South Bay, and a channel 8 feet deep and
100 feet wide from the central basin in the bay to the head of naviga-
tion in Patchogue River. The length of section included in the proj-
ect is about 17 miles. Mean tidal range in the bay, 1 foot; mean
range of spring tides, 1.1 feet; extreme range due to wind and bar-
ometric pressure, 2.5 feet. The estimate of cost for new work, made
in 1900, is $66,000, exclusive of amount expended under previous
project. The latest (1900) approved estimate for annual cost of
maintenance is $2,000.
   The existing project was adopted by the River and Harbor Act of
June 13, 1902 (H. Doc. No. 103, 56th Cong., 2d sess.). For latest
published map see Annual Report for 1916, page 2018.
   Terminal facilities.--Water terminals, 7 in number, with available
wharfage of 4,100 feet, are scattered along the shore of Patchogue
River between its mouth and the head of the projected improvement,
1 on the east bank and 6 on the, west bank. Three, with available
wharfage of 700 feet, are publicly owned. Four, with available
wharfage of 3,400 feet, are privately owned. All are open to the
118              REPORT OF CHIEF OF ENGINEERS,                           U.       S.     ARMY,          1934

public. One, with available wharfage of 2,000 feet, has rail con-
nection. These facilities are adequate for the water-borne commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The project is 90 percent com-
pleted. The channel in Patchogue River was completed in 1904.
Of projected channels through three bars in the bay only the easterly
one, bar C, was dredged; it had been practically obliterated. The
work remaining to be done to complete the project consists in the
,excavation of a channel through bars A and B and a bar extending
out from the jetties to the 8-foot contour in the bay; but no further
work of improvement appears to be necessary at this time. A west
jetty, 1,700 feet long, was completed under the previous project in
1897 and repaired in 1914. An east jetty, formed of a sand spit
1,000 feet long with a riprap extension 330 feet long, completed
in 1917, was built for the purpose of maintaining the depth in the
,entrance channel to the river. Both jetties are in good condition.
When examined in May 1933, the controlling mean low water depth
was about 6 feet through a channel of navigable width in Patchogue
River. The total costs and expenditures have been $148,363.97-
$59,820.82 for new work and $88,543.15 for maintenance.
   Proposed operations.-No funds are available and no work is
proposed during the fiscal year 1935.
   It is believed that dredging for maintenance will be necessary dur-
ing the next 2 years. Therefore, the sum of $15,000 can be profitably
expended during the fiscal year ending June 30, 1936, in mainte-
nance dredging by contract (August-September 1935) in the channel
leading from deep water in Great South Bay to the entrance to
Patchogue River.
                                       Cost and financial summary

Cost of new work to June 30, 1934                                --                     ------                $99, 820. 82
Cost cf maintenance to June 30, 1934                                    __
                                                           ---------------                        __           88, 543. 15

      Total cost of permanent work to June 30, 1934-----------                                                188, 363. 97
Net total expenditures      -----------------                                                                 188, 363. 97
Total amount appropriated to June 30, 1934         ---                                                        188, 363. 97


           Fiscal year ending June 30               1930         1931                  1932            1933          1934

Cost of new work                              -       -                       -
Cost of maintenance                               $1, 085. 77     $39. 75               $10. 60

Total expended             ----                    2, 085. 38         59.75              10.60---------------------


Allotted    --   - - - -    - -----   - -   --.      600.00        -.. ----
                                                                 ---
                                                                1---                                   -$36.03   -
Amount (estimated) required to be appropriated for completion of
existing project------------------      ------------------------ $6, 100
Amount that can be profitably expended in fiscal year ending June 30,
1936, for maintenance----------------------------------_-- 15, 000

                                      11. BROWNS CREEK, N. Y.

  Location.-This is a narrow, crooked tidal stream emptying into
Great South Bay, near Sayville, Long Island, N. Y., about 12.5
miles northeast of Fire Island Inlet, and about 55 miles east of
New York City. (See U. S. Coast and Geodetic Survey Chart No.
578.)
      RIVERS AND HARBORS-FIRST      NEW YORK, N. Y., DISTRICT     119
   Eisting project.-This provides for a channel 100 feet wide and
6 feet deep at mean low water from the 6-foot contour in Great South
Bay for a distance of 1,850 feet, and thence, with same width, 4 feet
deep to the head of navigation; also for two stone jetties to protect
the entrance, the east jetty to be 1,400 feet long and the west jetty
1,600 feet long. The total length of channel under improvement is
about 6,500 feet. Mean tidal range, 1 foot; mean range of spring
tides, 1.1 feet; extreme range due to wind and barometric pressure,
2.5 feet. The estimate of cost for new work, revised in 1928, is
$85,000. The latest (1928) approved estimate for annual cost of
maintenance is $2,000.
   The existing project was adopted by the River and Harbor Act of
September 19, 1890 (H. Ex. Doc. No. 22, 51st Cong., 1st sess.). For
latest published map, see House Document No. 991, Sixty-fourth
Congress, first session.
   Terminal facilities.-Water terminals, 7 in number, with available
dockage of 1,450 feet, are scattered along the shore of the creek be-
tween its mouth and the head of the improved channel, 6 on the west
bank and 1 on the east bank. Three, with available dockage of 600
feet, are publicly owned; all others are privately owned. All are
open to the public. None has rail connection. The facilities are
adequate for the amount and kind of commerce involved.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The project is about 36 percent
completed. The channel has been dredged to project width for a
length of 3,200 feet, 1,850 feet of which length, beginning at the 6-
foot contour in the bay and extending inland, was dredged to 6 feet
at mean low water; the remaining 1,350 feet was dredged to a depth
of 4 feet. The east jetty was built up to a height of 1 foot above
mean high water, a width of 3 feet on top and a length of 448 feet,
in 1893; it is now in very poor condition. The west jetty was com-
pleted to a length of 492 feet in 1892; in 1927 it was carried up to a
height of 3 feet above high water and widened to about 35 feet by the
deposit along its western side of sand dredged from the entrance
channel. When examined in July 1930 and May 1933 the con-
trolling mean low water depth from the entrance in Great South
Bay for a distance of 900 feet upstream and 100 feet wide was 5.6
feet; thence to 1,500 feet south of the Sayville highway bridge it was
3.7 feet through a navigable channel 40 feet to 100 feet in width;
thence to the head of the project it was 1.3 feet through a navigable
channel 40 feet to 100 feet in width. The work remaining to be done
to complete the project consists in extending the jetties and length-
ening the channel of 4 feet depth northward, about 3,300 feet.
   The total cost and expenditures have been $83,360.08-$30,312 for
new work and $53,048.08 for maintenance.
   Proposed operations.-No funds are available and no work is
proposed during the fiscal year 1935.
   It is believed that dredging for maintenance will be necessary
during the next 2 years. Therefore, the sum of $10,000 can be
profitably expended on this work during the fiscal year ending June
30, 1936, in maintenance dredging by contract (August-September
1935) at the mouth of the creek and at a point about three-fourths
of a mile upstream from the mouth.
120       REPORT OF CHIEF OF               ENGINEERS,         U.   S. ARMY,      1934

                                 Cost and financial summary

Cost of new work to June 30, 1934-------------------------$30, 312. 00
                                    -----------------------
'Cost of maintenance to June 30, 1934_                       53, 048.08
       Total cost of permanent work to June 30, 1934-------------83, 360. 08
Net total expenditures--     --------------------------------    83, 360. 08
'Total amount appropriated to June 30, 1934---------------_-   __ 83; 360. 08

        Fiscal year ending June 30          1930       1931        1932        1933             1934


'Cost of new work-__......------------       -----------------------------------------
"Cost of maintenance- ------- ______   -----        $40.45---------------
                                                            -----
'Totaespended_         ____
             -----------------------------------         40.45-----------------------------------
Allotted- -----      ---------------.     -------------------------------.   -$361. 92.......


Amount (estimated) required to be appropriated for completion of
existing project______________-__________         -              $54, 600
Amount that can be profitably expended in fiscal year ending June
                                 _
   30, 1936, for maintenance -------------                                         --           10, 000

                   12. EAST ROCKAWAY               (DEBS)     INLET, N. Y.

    Location.-On the south shore of Long Island between the main
body of the island and the western end o'f Long Beach. It is 10
miles east of Rockaway Inlet and about 27 miles by water from the
Battery, 'New York City. (See U. S. Coast and Geodetic Survey
'Charts Nos. 579 and 1215.)
    Existing project.-This provides for a channel 12 feet deep at
-mean low water and 250 feet wide from the 12-foot contour in the
Atlantic Ocean to the 12-foot contour in Long Beach Channel, pro-
tected by jetties. Mean tidal range, 3.9 feet; mean range of spring
tides, 4.7 feet; irregular fluctuations due to wind and barometric
pressure vary from about 31/2 feet below mean low water up to
about 31/2 feet above mean high water.
    The estimate of cost for new work made in 1929 is $710,000 (of
-which $100,000 was contributed by local interests). The latest (1929)
'approved estimate for annual cost of maintenance is $20,000.
    The existing project was adopted by the River and Harbor Act of
July 3, 1930 (H. Doc. No. 19, 71st Cong., 1st sess.). The latest pub-
lished map is in the project document.
    Local cooperation.--The River and Harbor Act of July 3, 1930,
provides that local interests shall contribute $100,000 to the cost of
the work; give assurances satisfactory to the Secretary of War and
the Chief of Engineers that they will provide and maintain at their
own expense interior channels suitable for navigation, not less than
12 feet deep, from East Rockaway Inlet, to the Hempstead-Oyster
Bay line, a distance of about 15 miles, to Hewlett Harbor, and to
Freeport Harbor; furnish, without expense to the United States,
necessary land, easements, and rights-of-way for construction and
maintenance of the jetties, and agree to hold and save the United
States free of claims for damages to public and private property
resulting from the improvement.
    Local interests have furnished the necessary easement, right-of-
  way for construction, and release of claims for damages necessary
 :for the construction of the east jetty, and have contributed $100,000.
      RIVERS AND HARBORS-FIRST NEW YORK, N.               Y., DISTRICT     121

    Terminal faclities.-No terminals are within the area immediately
aadjacent to the improvement. The water front on the north side
of Long Beach has been bulkheaded. A town wharf with available
 =dockage of about 400 feet exists at Woodmere. There is also a town
wharf at East Rockaway. It is expected that additional dockage
will become available when needed.
    Operations and results during fiscal year.-Under a continuing
  contract for the construction of a riprap east jetty for a length of
  about 4,250 feet at the westerly end of Long Beach, work commenced
February 27, 1933, and was in progress at the end of the fiscal year
  1934. There were placed in the jetty 113,830 tons of stone at a
total cost ofE$40949083 of which $406;672:22 were regular ;funds .and
 $2,818.61 were contributed funds, all for new work. The contract is
 .about 99 percent completed. The expenditures were $424,268.18,
including $40,001.18 contributed funds.
    With Public Works funds a survey preliminary to contract for
dredging was made (May-June 1934) at a total cost of $916.81, for
new work. The expenditures were $527.25.
    The total cost was $410,407.64, all for new work, of which $407,-
589.03 were United States funds and $2,818.61 contributed funds.
The total expenditures were $424,795.43, of which $384,794.25 were
United States funds and $40,001.18 contributed funds.
    Condition at end of fiscal year.-The project is about 72 percent
,completed. About 4,250 linear feet of the east jetty were completed
at the end of the fiscal year. No dredging has been done. The
,controlling mean low-water depth, as shown by an examination made
in April-May 1934, was 6.8 feet in the adopted channel across the bar
to deep water in East Rockaway Inlet. The work remaining to be
done to complete the existing project consists in dredging the en-
trance channel to a depth of 12 feet and width of 250 feet, completing
the east jetty now under construction and in building a west jetty,
if necessary to protect the channel. The total cost to June 30, 1934,
was $512,385.84, of which $412,385.84 were regular funds and
 $100,000 contributed funds, all for new work. The total expendi-
tures were $488,045.67, of which $388,045.67 were regular funds, and
:$100,000 contributed funds.
    With funds allotted by the Public Works Administration, a survey
preliminary to contract for dredging has been made. The cost to
June 30, 1934, was $916.81 for new work. The expenditures were
 $527.25.
    The total cost of all work to June 30, 1934, was $513,302.65, for
new work, of which $413,302.65 were United States funds and
 $100,000 contributed funds. The total expenditures were $488,572.92,
of which $388,572.92 were United States funds and $100,000
contributed funds.
    Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $34,364.67, will be applied as follows:
Accounts payable June 30, 1934-------------------------------- $24, 340. 17
New work: Complete during July 1934, construction of the east
  jetty under a continuing contract in   force.   Amount to be ex-
  pended to complete-----------------------------------------        10, 024. 50
      Total- --------------                 ---           -   -      34, 364.67
122          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

  The balance unexpended at the end of the fiscal year, amounting to
$69,472.75, of allotment from the National Industrial Recovery Act
of 1933 will be applied as follows:
Accounts payable June 30, 1934_______-__-_________                  $389. 56
New work: Complete by Oct. 31, 1934, under contract to be entered
into, dredging the entrance channel to project dimensions ___
                                                             --   69, 083. 19
           Total ---------------------------------------------------                                            69, 472. 75
   The construction of the west jetty is not at the present time con-
sidered necessary. It is believed that maintenance work will not be
necessary during the next 2 years. Therefore, no funds can be
profitably expended during the fiscal year ending June 30, 1936.

                                              Cost and financial summary

                                   MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934 ___________                     $412, 385. 84
                                                              -____________
Cost of maintenance to June 30, 1934___________________________
      Total cost of permanent work to June 30, 1934___                                                      412, 385. 84
Minus accounts payable June 30, 1934________________________                                                 24, 340. 17
      Net total expenditures____________________________                                                    388, 045. 67
Unexpended balance June 30, 1934------------------------------                                               34, 364. 67

           Total amount appropriated to June 30, 1934_____________                                          422, 410.34

         Fiscal year ending June 30                               1930          1931     1932       1933            1934


Cost of new work__________                               ......
                                              ________----    ------------------------            $5, 713. 62    $406, 672. 22
Cost ofmaintenance__               __________-----------------------                            ------------------------
Total expended......          ----------------------------                                         3, 778.67      384, 267. 00

Allotted               -------------------------------------------------                         149, 823. 91     272, 586. 43



Balance unexpended July 1, 1933____________________________ $146, 045. 24
Amount allotted from War Department Appropriation
Act approved July 14, 1932____________________ $265,000.00
Amount allotted from War Department Appropriation
Act approved Mar. 4. 1933____________- __-___--8,    000. 00
                                                              273, 000. 00

      Amount to be accounted for-----------------------                                                     419, 045. 24
Deductions on account of revocation of allotment------- ---------                                                413.57

           Net amount to be accounted for---------------------------                                        418, 631. 67
Gross amount expended____________________________                                        $384,290.88
Less reimbursements collected                           -----------------------                 23. 88
                                                                                                           384, 267.00
      Balance unexpended June 30, 1934______________________                                                    34, 364. 67
Outstanding liabilities June 30, 1934________________    $10. 67
Amount covered by uncompleted contracts--_______ _    34, 140. 77
                                                                                                                34, 151. 44

           Balance available June 30, 1934 _______________________                                                 213. 23

Amount (estimated) required to be appropriated for completion
of existing project 1_---- _117, ---                                                                               500. 00
   1Exclusive of available funds.
            RIVERS AND IIARBORS-FIRST NEW YORK, N. Y., DISTRICT                                                          123
                                                        PUBLIC WORKS FUNDS
Cost of new work to June 30, 1934_-----------__-_____-______                                                        $916. 81
Cost of maintenance to June 30, 1934___
      Total cost of permanent work to June 30, 1934--------------                                                     916.81
Minus accounts payable June 30, 1934 __ .____ . ______________                                                        389.56
      Net total expenditures----------------------------------   527. 25
Unexpended balance June 30, 1934     --------------------------
                                                              69,472. 75
          Total amount appropriated to June 30, 1934 -___                                       ___________ 70, 000. 00

          Fiscal year ending June 30                             1930          1931        1932        1933            1934

Cost of new work-----------------------------------_                                                                    $916. 81
              or
Cost of maintenance                           ..
                    ----------------------------------------------                                                     $916-.
Total expended--........--         ..--------------..      ---------...   ----------------------------------             527. 25
Allotted------------------------- --------                      ----------------------      -            ------       70,000.00


Amount allotted from National Industrial Recovery Act approved
  June 16, 1933---------------------------------------------- $70, 000. 00
Gross amount expended----------------------------------      --    527. 25
      Balance unexpended June 30, 1934_ ____________ -     -__                                                     69, 472. 75
Outstanding liabilities June 30, 1934 ____
                                      --   - - -__ -- _____ _-                                                         389. 56
           Balance available June 30, 1934------------------------                                                 69, 083. 19
         CONSOLIDATED COST AND FINANCIAL SUMMARY FOR UNITED STATES FUNDS

Cost of new work to June 30, 1934_ -_ _-                         $413, 302. 65
Cost of maintenance to June 30, 1934___________________________________
           Total cost of permanent work to June 30, 1934___                                                       413, 302. 65
Minus accounts payable June 30, 1934_______________________                                                        24, 729. 73
     Net total expenditures___--_____                      __--_ 388, 572. 92
Unexpended balance June 30, 1934______________________________ 103, 837.42
           Total amount appropriated to June 30, 1934 __-_____                                        ___         492, 410. 34

           Fiscal year ending June 30                            1930           1931       1932         1933           1934

Cost of new work...-----------------__--
Cost of maintenance.....--.          ..--
                                      --                     -- -      -- -                - --
                                                                                                      $5,713. 62 $407,
                                                                                                       - - -       -
                                                                                                                          b89.
                                                                                                                           03

Total expended------_-.----__----                          ______________.
                                                                        .                              3,778. 67 384, 794. 25
Allotted-------------------------------------......................------....------------            149,823.91      342, 586. 43


Balance unexpended July 1, 1933_-------------                                                                  $146, 045. 24
Amount allotted from War Department Appropriation
Act approved July 14, 1932_______________________ $265, 000. 00
Amount allotted from War Department, Appropriation
Act approved Mar. 4, 1933________________            8, 000. 00
Amount allotted from National Industrial Recovery
Act approved June 16, 1933         --------         70, 000. 00
                                                                                                                  343, 000. 00
      Amount to be accounted for_____________________________                                                     489, 045. 24
Deductions on account of revocation of allotment--
                                                  ........                                                             413. 57
            Net amount to be accounted for--
                                          ..                                                                      488, 631. 67
124             REPORT OF CHIEF OF ENGINEER,                                                 1U. S. ARMY,           1934

Gross amount expended---------------------------                                                  $384, 818.13
Less reimbursements collected -----------------                                                          23. 88
                                                                                                      _..                 $384. 794. 25
      Balance unexpended June 30, 1934       ---------------------                                                         103, 837. 42
Outstanding liabilities June 30, 1934-....----     -.      $400. 23
Amount covered by uncompleted contracts-----------34, 140. 77
                                                                                                                            34, 541.00

            Balance available June 30, 1934 -                                           ________---      __-----            69, 296. 42

Amount (estimated) required to be appropriated for completion
                     1- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
of existing project                                                                                                       117, 500. 00

                                                  CONTRIBUTED                    FUNDS


Cost of new work to June 30, 1934111111111111111111                                                                        100, 000. 00
Cost of maintenance to June 30, 1934---------------
            Total cost of permanent work to June 30, 1934                                                                   00, 000. 00
                                                                                                                           1-----------

Net total expenditures --    ------------------------------                                                                100, 000. 00
Total amount contributed to June 30, 1934--------------                                                                    100, 000. 00

            Fiscal year ending June 30                          1930                  1931        1932          1933              1934


Cost of new work--..--.         -----     ------------------------------------                              $97,181.39           $2, 818. 61
Cost of maintenance-....--                 ------------                     ----------------------------------------
Total expended ____            __------------------      _..-----------.--------                             59, 998.82          40, 001. 18
Contributed.....-----.....--     ------------------------------------------ 100, 000. 00


Balance unexpended July 1, 1933_-------------------------                                                                  $40, 001. 18.
Gross amount expended---       ----------------------                                                                       40, 001. 18

        CONSOLIDATED COST AND FIN.ANCIAL SUMMARY FOR EAST ROCKAWAY                                                         (DEBS)
                                                            INLET, N.            Y.


Cost of new work to June 30, 1934_____ _________-_________
Cost of maintenance to June 30, 1934-----__--__--______-- . _
                                                              $513, 302. 65
                                                                 .....                                                    ---
      Total cost of permanent work to June 30, 1934__---_____--
                                                              -                                                            513, 302. 65
Minus accounts payable June 30, 1934 -- _.--------______-__--                                                               24, 729. 73-

            Net total expenditures________________________                                                                 488, 572.92
Unexpended balance June 30, 1934_________________________                                                                  103, 837. 42
            Total amount contributed and appropriated                                            to June 30,
              1934      -------------------------------------------                                                        592, 410. 34

            Fiscal year ending June 30                          1930                  1931        1932             1933           1934


Cost of new work_..-----------___________--------...                                                        $102, 895.01      $410, 407. 64
Cost of maintenance......................
Total expended-............------------------------------------                               ------------ 63, 777. 49          424, 795.43
Allotted             --------------------------------                       ----------------------- 249,823. 91                 342, 586. 43

    1 Exclusive of available funds.
       RIVERS AND HARBORS-FIRST NEW YORK, N.                 Y., DISTRICT     125

Balance unexpended July 1, 1933__--------- ---------                $186, 046.42
Amountallotted from War. Department Appropration
Act -approved July 14, 1932 - ----         --- ..    $265 ,000.00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933 --         -__-____           8, 000. 00
Amount allotted from National Industrial Recovery
Act approved June 16, 1933______--    ----     _____   70, 000. 00
                                                                     343, 000. 00,
     Amount to be accounted for----------     ____________ 529, 046. 42
Deductions on account of revocation of allotment_--__----------- 413. 57

      Net amount to be accounted for ______________________           528, 632. 85
Gross amount expended_ ______________________ $424, 819. 31
Less reimbursements collected ______--____    ____         23. 88
                                                                      424, 795. 43
      Balance unexpended June 30, 1934________________________        103, 837. 42
Outstanding liabilities June 30, 1934---                $400. 23
Amount covered by uncompleted contracts__             34, 140. 77
                                                                        34, 541.00,
       Balance available June 30, 1934                                  69, 296. 42
Amount (estimated) required to be appropriated for completion
  of existing project 1______________ ___                              117, 500. 00,

                             13. JAMAICA BAY, N. Y.

   Location.-This is an indentation in the south shore of Long
Island, the entrance being about 8 miles east of the Narrows, New
York Harbor. (See U. S. Coast and Geodetic Survey Chart No.
542.)
  Previous projects.-Adopted by the acts of June 14 1880, and
July 13, 1892. The cost and expenditures amounted to $82,293.81-
$79,332.36 for new work and $2,961.45 for maintenance. For further
details see page 1770 of Annual Report for 1915.
  Existing project.-This is a cooperative project for making a gen-
eral harbor in Jamaica Bay. It provides for making and maintain-
ing an entrance channel 30 feet deep at mean low water and 1,500
feet wide, with widening at bends; a main channel extending from
the entrance channel up to the mouth of Cornells Creek, to be 30 feet
deep at mean low water and 1,000 feet wide, with widening at bends;
and for the protection of the entrance channel by one, or two, riprap
jetties, as may be necessary. The prosecution of work to be done at
the expense of the United States is to be subject to the conditions
specified under local cooperation. Length of section included in
the project, 14 miles; mean tidal range, 4.9 feet at Barren Island to
5.1 feet at Canarsie and Hammels; mean range of spring tides, 5.8
and 6.1 feet, respectively; irregular fluctuations due to wind and
barometric pressure vary from 4 feet below mean low water up to
3.5 feet above mean high water.
   Estimated cost to the United States for new work, made in 1919, is
$11,806,000. Estimated cost of annual maintenance work, made in
1919, in entrance channel, $160,000; in main channel, $100,000; total,
$260,000, all exclusive of amounts expended on previous projects
(Rivers and Harbors Committee Doc. No. 4, 66th Cong., 2d sess.).
  1Exclusive of available funds.
126      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,               1934

   The existing project as printed in House Document No. 1488,
Sixtieth Congress, second session, was adopted by the River and
Harbor Acts of June 25, 1910, and September 22, 1922. The latest
published map is in House Document No. 1488, Sixtieth Congress,
second session.
   Local cooperation.-In adopting the enlarged project the River
and Harbor Act of September 22, 1922, provided that any fund here-
tofore or hereafter appropriated for this improvement may be ap-
plied to providing the channel specified in House Document No.
1488, Sixtieth Congress, second session, with a depth of 30 feet
at mean low water whenever and to such extent as the city of New
York shall construct or provide for the construction of terminals
with facilities suitable to channels of that depth. It also provided
that the city of New York may be reimbursed for dredging and
disposing of the material dredged in the main interior channel at
actual cost, which shall not exceed a rate of 10 cents per cubic yard,
including any cost of inspection borne by the United States, such
reimbursement to include overdepth allowance not exceeding 1 foot.
To meet these conditions the city of New York had, up to December
31, 1932, appropriated a total of $14,294,929.11, of which amount
$3,254,000 was applied to airport construction. The airport is lo-
cated in the vicinity of Barren Island. There had been expended
up to December 31, 1932, $14,214,861.26, including $3,173,932.15 for
airport construction and with the funds appropriated the city has
proceeded as follows:
   (a) Has secured title to 2,710 acres of upland and land under water located
along about 7 miles of the water front of Jamaica Bay between Barren Island
and the Long Island Railroad crossing on the north side of the bay at Hamilton
Beach; this includes 339 acres which will afford the city an opportunity for
constructing a railroad connection from the New York Connecting Railroad to
and around the entire Jamaica Bay water front in accordance with a plan
adopted by the city authorities June 25. 1925. The city of New York has
expended up to December 31, 1932, $5,444,687.49 for acquisition of property
along the shores of Jamaica Bay.
   (b) Has dredged a channel 18 feet deep in Mill Basin at a cost of $66,937.
   (c) Built a wooden bulkhead platform 400 feet long at the head of Mill Basin
at a cost of $63,114.
   (d) Has expended about $534,700 constructing a reinforced concrete bulk-
head platform in Mill Basin extending about 2,700 feet southward from
Avenue U.
   (e) Has extended Flatbush Avenue southward to the water front of Barren
Island and inaugurated a ferry service across Rockaway Inlet, connecting
Flatbush Avenue with the Rockaways.
   (f) In cooperation with the president of the Borough of Queens, constructed
a boulevard across Jamaica Bay connecting Borough of Queens at Woodhaven
with the Rockaways at Holland, thus shortening the previous vehicular route
by about 10 miles. A cross-bay channel was excavated in connection with this
work, the excavated material being used in constructing the boulevard. Has
dredged a channel 18 feet deep, 300 feet wide, and 7,500 feet long in Paerdegat
Basin at a cost of $269,921.
   (g) The construction of a pier at Canarsie suited to vessels requiring a
channel 30 feet deep is completed except for the construction of storage sheds
and the installation of freight-handling facilities, which are to be of a type
adapted to the requirement of the lessee. Contract price, $487,269. Rockaway
Parkway, leading to the pier, is being widened to 120 feet.
   (h) Progress has been made by a committee appointed by the city authorities
to make a study of proposed arrangements for interchange of freight between
rail and water.
          RIVERS AND HARBORS-FIRST NEW YORK, N.      Y., DISTRICT   127

    The main interior channel of 30 feet depth and 1,000 feet width
has been dredged from Barren Island to Canarsie Pier, a length of
:about 20,000 feet. Repayment to the city of the cost of dredging the
main interior channel up to but not exceeding 10 cents per cubic
yard, place measurement, including the cost of inspection, is made
by the United States.
    Terminal facilities.-Besides the landings at Barren Island, Can-
arsie, and other points built before the improvement was begun and
little affected by it, 3,106 linear feet of bulkhead made by the city in
Mill Creek Basin are used. The existing facilities are fairly ade-
,quate   for the existing commerce, but are wholly inadequate for the
commerce anticipated and for which the project was adopted. (For
latest full description of terminal facilities see Port Series No. 20,
 °Corps of Engineers.)
    Operations and results during fiscal year.-Under a continuing
contract for the construction of the east jetty for a length of about
:8,400 feet, work commenced March 11, 1931, was completed August
.5, 1933. There were placed in the jetty 4,855 tons of stone at a total

,effect
cost of $19,149.45 for new work. The cost of a survey to determine
         of jetty construction was $1,316.58 for new work. The total
cost was $20,466.03, all for new work. The total expenditures were
!$57,724.42.
    Condition at end of fiscal year.-The project is about 36 percent
completed. The main interior channel has been dredged to a depth
,of 30 feet at mean low water and width of 1,000 feet from Barren
Island up to Canarsie, a length of about 18,100 feet; thence up to a
point 500 feet east of Fresh Creek Basin, a stretch of about 3,400
feet. it has been dredged to a depth of 18 feet at mean low water and
width of 500 feet. The east jetty was completed August 4, 1933,
for a total length of about 8,400 feet. The controlling mean low
water depth through a navigable channel 500 to 1,000 feet wide from
the ocean to Canarsie was about 20 feet, from a survey made in
June-July 1932 and June-July 1934. The work remaining to be
-done at the expense of the United States to complete the existing
project consists in dredging the entrance channel to a depth of
30 feet and width of 1,500 feet, and in building a west jetty, if
necessary to maintain a channel of project dimensions, and in
dredging the main interior channel to a depth of 30 feet at mean
low water and width of 1,000 feet from Canarsie up to the head of
  the projected improvement at the mouth of Cornell Creek.
    The city of New York has, at its expense, met the conditions
prescribed by Congress in adopting the project to the extent outlined
-under Local cooperation. The terminal at Canarsie has been partly
completed; highway and railroad connections with this terminal
have yet to be made, and facilities for handling cargoes, suited to the
kind of freight to be handled by lessees, are to be installed at the
time of leasing. Additional terminals suited to vessels requiring a
channel of 30 feet depth, with highway and railroad connections, and
  freight-handling facilities are to be provided by the city of New
  York in advance of the extension of the channel northward from the
pier at Canarsie.
         91536--ENG   1934-9
128          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

   The total cost to the United States of the existing project up to
June 30, 1934, was $4,280,164.57-$4,227,861.06 for new work and
$52,303.51 for maintenance. The total expenditures amounted to
$4,279,787.97.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $1,390.62, will be applied to, the payment
of accounts payable at the end of the fiscal year, amounting to
$376.60, and to the cost of contingencies pertaining to. maintenance
of the improvement.
   Further dredging for improvement or maintenance will not be
necessary during the next 2 years. Therefore, no additional funds
can be profitably expended during the fiscal year ending June 30,.
1936.
                                     Cost and financial summary

Cost of new work to June 30, 1934_---------------------------  $4, 307, 193. 42
Cost of maintenance to June 30, 1934--------------------------      55, 264. 96.
      Total cost of permanent work to June 30, 1934-----------                                               4, 362, 458. 38
Minus accounts payable June 30, 1934--------------------------                                                       376. 60
      Net total expenditures--- ------------------      ---                                                  4, 362, 081. 78
Unexpended balance June 30, 1934-----------------------------                                                     1, 390. 62

         Total amount appropriated to June 30, 1934-------------- 4, 363, 472. 40

      Fiscal year ending June 30                    1930           1931            1932               1933           1934


Cost of new work _------------------      $138, 078. 66 $86, 908. 03 $896, 492. 14 $1, 016, 209. 55                $20, 466. 03.
Cost of maintenance   ...___ ______-----_               _ ______        2, 535. 61          542. 07
      Total cost- -_.............             138, 078. 66       86, 10S. 03   899, 027. 75    1, 016, 751. 62      20, 466. 03
Total expended       --------------------     358, 677. 14        77, 212. 24 790, 750.   90   1,.097, 110. 27      57, 724. 42

Allotted-------------------------           -311,     200. 00   506, 000. 00 -37, 699. 06      1, 036, 675. 49     -2, 097. 84



Balance unexpended July 1, 1933----------------__                                                              $61, 212. 88
Deductions on account of revocation of allotment ----------------                                                2, 097. 84

       Net amount to be accounted for---------------  -59,                                                          115. 04
Gross amount expended----------------------------$57, 725. 13
Less reimbursements collected -----------------------      . 71
                                                                                                                 57, 724. 42

      Balance unexpended June 30, 1934------------------------                                                    1, :90. 62
Outstanding liabilities June 30, 1934----------------------------                                                    376. 60

         Balance available June 30, 1934---------------------                                                     1, 014. 02

Amount (estimated) required to be appropriated for completion of
  existing project 1-----------------------------------                                          --          , 578, 000. 00

14. NEW YORK HARBOR: AMBROSE, MAIN SHIP, BAYSIDE, AND GED-
  NEY CHANNELS, INCLUDING ANCHORAGE CHANNEL AND CRAVEN
   SHOAL, AND CHANNEL BETWEEN STATEN ISLAND AND HOFFMAN
  AND SWINBURNE ISLANDS, N. Y.

  Location.The works included under the above title are in the
Lower Bay and in the lower part of the Upper Bay, New York
Harbor. The Lower Bay is 330 miles southwest by water of Boston
  1Exclusive of available funds.
      RIVERS AND HARBORS-FIRST       NEW YORK, N.   Y., DISTRICT   129


Harbor, Mass., and 165 miles northeast of the entrance to Delaware
Bay, N. J., and Del.
   The Upper Bay extends southerly from the junction of Hudson
and East Rivers opposite the Battery, New York City, a distance
of about 51 miles. The Lower Bay extends from the Narrows to
the sea, a distance of about 9 miles. (See U. S. Coast and Geodetic
Survey Charts Nos. 369 and 541.)
   Existing project.-This provides for the Ambrose Channel 40 feet
deep and 2,000 feet wide, extending from the sea to deep water in
the Lower Bay, length about 7.5 miles; for the Anchorage Channel,
an extension of Ambrose Channel, with the same depth and width,.
in the Upper Bay, opposite the anchorage grounds, length about &35
miles; for the Main Ship-Bayside-Gedney Channel, 30 feet deep and
1,000 feet wide, extending from the sea to deep water in the Lower
Bay, length about 101/2 miles; for the removal of Craven Shoal to,
a depth of 30 feet; for a channel 16 feet deep, 200 feet wide, and
about 12,500 feet long, extending from Bell Buoy 23 to Hoffman
and Swinburne Islands. The project depths refer to mean low
water. Mean tidal range, 4.7 feet; mean range of spring tides, 5.6
feet; irregular fluctuations due to wind and barometric pressure vary
from 4 feet below mean low water up to 4 feet above mean high
water.
    The estimate of cost for new work, revised in 1930, is $8,803,000.
The latest (1930) approved estimate for annual cost of maintenance:
is $165,000.
    The existing project was authorized by the following river and
harbor acts: The act of July 5, 1884, provided for the Main Ship-
Bayside-Gedney Channel, and the dimensions of this channel were
fixed by the Secretary of War, December 27, 1886, under authority of
the act of August 5, 1886 (A. R. 1887, p. 62, and 1888, p. 63) : the act
of March 3, 1899, provided for the Ambrose Channel (H. Doc. No.
159, 55th Cong., 3d sess.) ; the act of June 25, 1910, provided for the
maintenance of the entrance channels under one head; the act of
August 8, 1917, provided for extending the Ambrose Channel into
the Upper Bay opposite the.anchorage grounds (H. Doc. No. 518,
63d Cong., 2d sess.), for the removal of Craven Shoal (H. Doc. No.
557, 64th Cong., 1st sess.), and for the channel to the Quarantine
Islands (H. Doc. No. 625, 64th Cong., 1st sess.) ; the act of July 3,
1930, provided for changing the position of the southerly section of
Anchorage Channel to give a fairway 2,000 feet wide and 40 feet
deep (River and Harbor Committee Doc. No. 18, 71st Cong., 2d
sess.). The latest published map of Ambrose Channel is in the
Annual Report for 1914, page 1734, and the latest published maps
of the other localities in their respective project documents.
   Recommended modifications of project.-Under date of September
12, 1933, the Chief of Engineers recommended modification of the
existing project for New York Harbor so as to provide for dredging
the area at the south end of Red Hook Flats 40 feet and 30 feet;
dredging the north half of the Jersey Flats to 20 feet and dredging
a channel 20 feet deep and 500 feet wide along the New Jersey pier-
head line from Kill Van Kull to this anchorage, at an estimated first
cost of $3,750,000, with maintenance at $125,000, in addition to that
now required (H. Doc. No. 183, 73d Cong., 2d sess.).
130    REPORT OF CHIEF OF ENGINEERS,       IT. S. ARMY,   1934


   Terminal facilities.-In the harbor (Lower Bay, the Narrows,
and the Upper Bay) there are 35 piers, 4 ferry terminals, 4 car-float
 (railroad) terminal bridges, and various bulkheads and wharves.
The Lower Bay is largely undeveloped, having 11 piers and 12 bulk-
heads along the shores. At the Narrows, along the Staten Island
water front, and along the westerly shore of the Upper Bay from
Greenville, N. J., to Ellis Island, terminals are located as follows:
On Staten Island there are 23 piers in addition to the United States
quarantine station for the Port of New York. The remaining fea-
tures are: 1 shipyard and 2 ferry terminals. Along the westerly
shore of the Upper Bay (Greenville, N. J., to Ellis Island) there
are 4 large railroad freight terminals. One terminal is equipped
with facilities for handling ocean-going vessels. The terminals in
Buttermilk Channel, Bay Ridge and Red Hook Channels, and
Gowanus Creek (see separate reports under respective titles) are
reached through New York Harbor.
   By compact dated April 30, 1921, the States of New York and
New Jersey established the Port of New York District, embracing
the territory roughly 25 miles in radius around the Statue of
Liberty, and created the Port of New York Authority. (For latest
full description of terminal facilities see Port Series No. 20, Corps
of Engineers.)
   Operations and results during fiscal year.-The U. S. sea-going
dredge Navesink was employed in the Anchorage Channel, dredging
to 40 feet, from July 1 to 31, 1933, removing a total of 12,698 cubic
yards, bin measurement, of mud and sand, at a cost of $3,081.13 for
maintenance.
   The U. S. sea-going dredge Raritan was employed in Main Ship
Channel, dredging to 30 feet, from July 1 to August 31, 1933, re-
moving a total of 271,410 cubic yards, bin measurement, of mud and
sand, at a cost of $35,946.28 for maintenance.
   The U. S. sea-going dredges Atlantic and Marshall were employed
in Ambrose Channel, dredging to 40 feet, from July 1 to 31, 1933, and
from September 17 to 30, 1933, respectively, in removing a total of
296,014 cubic yards, bin measurement, of mud and sand, at a cost of
$24,498.88 for maintenance.
   The U. S. sea-going dredge Marshall was employed in Bayside
Channel, dredging to 30 feet from March 7 to 18, 1934, removing a
total of 50,065 cubic yards, bin measurement, of mud and sand, at a
cost of $7,639.29 for maintenance.
   The total cost of all work was $71,165.58, all for maintenance.
The total expenditures were minus $177,303.73.
    Condition at end of fiscal year.-The project has been considered
completed since 1932; the channel between Staten Island, Hoffman,
and Swinburne Islands at its southern limits for a length of 300 feet
was not improved because deemed unnecessary. Main Ship-Bayside-
Gedney Channel was completed in 1891; the depth was increased
from its original depth of 23.7 feet to the project depth of 30 feet
at mean low water. The cost of new work amounted to $1,579,985.65,
including $116,530 applied to removing wrecks and a sunken rock,
authorized by acts of July 25, 1868, and January 8, 1873. Subsequent
         RIVERS AND HARBORS-FIRST NEW YORK, N.                                                        Y., DISTRICT                131
to the completion of the channels in 1891, up to June 30, 1928, the
net cost of maintaining the entrance channels was $1,893,028.56.
   Ambrose Channel was completed in 1914; it was increased in depth
from its original depth of 16 feet to the project depth of 40 feet at
mean low water. The estimated cost of this improvement was
$6,688,000; it was completed at a gross cost of $5,190,507.08, including
the cost of building dredges specially designed for the work.
   Anchorage Channel has been completed to 40 feet depth at mean
low water. -Dredging made necessary in this locality by a relocation,
moving the channel to the eastward, authorized in the River and
Harbor Act of July 3, 1930, was completed in 1932.
   The channel between Staten Island and Hoffman and Swinburne
Islands was completed in 1920 to project dimensions up to within
300 feet of the southern limits of the project. The dredged channel
now meets all the demands of navigation, therefore further work of
improvement is not contemplated for the present.
   As shown by an examination made during June 1932, December
1933, and April 1934, shoals at and near the junction of Bayside-
Gedney Channels have reduced the width of the channel of project
depth to about 600 feet.
   The controlling depths for the full width of the several channels
at mean low water are as follows: Ambrose Channel, 40 feet; Main
Ship, 27 feet; Bayside-Gedney Channel, 26 feet from an examina-
tion made during June-September 1932; Anchorage Channel (June-
July 1932), 40 feet; Craven Shoal (January 1932), 30 feet; channel
between Staten Island and Hoffman and Swinburne Islands (Janu-
ary 1932), 15 feet to Hoffman Island; thence to Swinburne Island,
12 feet.
   In the table following are shown the cost of prosecuting work in
each of the channels included in the project, and the total cost of the
project up to June 30, 1934.

                          Appropriations for-                                        New work         Maintenance             Total

Ambrose Channel--...---........                 ..--------------------------.    $3, 853, 184. 01          $50, 464. 70   $3, 903, 648. 71
      Total for Ambrose Channel----------------------3, 853, 184. 01                                        50, 464. 70    3, 903, 648. 71
Maintenance, including Ambrose Channel, Main Ship-
Bayside-Gedney Channel, Anchorage Channel, and Craven
Shoal        -----------------------------------------------------                                   2, 151, 941.04       2,151, 941.04
Main Ship-Bayside-Gedney Channel___-------------------- 1, 579, 985. 65                                -__     _           1, 579, 985. 65
Anchorage Channel....          .....           ...---------------------------------
                                                                      1, 762, 796. 93                   -_    _            1, 762, 796.93
Craven Shoal. ________-------------------------                          138, 471. 53                 -_                      138, 471. 53
      Total for maintenance of Entrance Channel                                     3, 481, 254. 11
                                                                          ..----------                2, 151, 941. 04      5, 633, 195. 15
Channel between Staten Island and Hoffman and Swin-
  burne Islands..__-..          ____     ---------    ___--___                  _-     129, 337. 05          2, 162. 95      131, 500. 0&
      Total-----------.......          ----------------------------                  7, 463, 775.17   2, 204, 568. 69      9, 668, 343. 86



  The total expenditures up to June 30, 1934, amounted to
$11,280,178.45.
  Proposed operations.-The balance unexpended, including ac-
counts receivable, amounting to $699,503.45, will be applied as
follows:
132          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

Accounts payable June 30, 1934---------------------------------                                               $3, 372. 55
Maintenance:
    Operate 1 United States sea-going dredge for 2 months (May
      and June 1935) in removing shoals near the junction of Bay-
      side and Main Ship Channels-----------------------------                                                40, 000. 00
    Operate 1 United States seagoing dredge for a total of 2 dredge
      months during the period March-June 1935, in Main Ship
      Channel near the junction with Ambrose Channel                                                          40, 000. 00
    Operate 1 United States sea-going dredge in Anchorage Chan-
      nel near junctions with Bay Ridge Channel and Buttermilk
      Channel for a total of 4 dredge months during the period
      February-June 1935 -------------------------------------                                             85, 482. 71
    Operating fund for dredges --------------------------------                                           530, 648. 19
          Total                                                                                                 503. 45
                                                                                                          6------------------------------
    The full project dimensions should be maintained in the entrance
channels. Therefore, the sum of $165,000 can be profitably expended
on this work durng the fiscal year ending June 30, 1936, in the
operation of one United States sea-going dredge about 8 months in
the entrance channels (July 1935 to February 1936).
                                     Cost and financial summary
Cost of new work to June 30, 1934---------------------------_                                        $7, 463, 775. 17
Cost of maintenance to June 30, 1934-----------------------                                          22,204, 568. 09
      Total cost of permanent work to June 30, 1934-----------                                        9, 668, 343. 80
Value of plant, materials, etc., on hand June 30, 1934-----------                                      , 554, 744. 38
      Net total cost to June 30, 1934-----------------------11, 223, 088. 24
Plus accounts receivable June 30, 1934------------------------  101, 611. 71

      Gross total costs to June 30, 1934---------------------- 11, 324, 699. 95
Minus accounts payable June 30, 1934-------------------------       44, 521. 50

     Net total expenditures----------------------------                                              11, 280, 178. 45
Unexpended balance June 30, 1934_-------------------                                                     597, 891. 74

          Total amount appropriated to June 30, 1934-------------- 11, 878, 070. 19

        Fiscal rear ending June 30                1930           1931               1932          1933              1934


Cost of new work ------    ----------------- -   ___ $104, 952. 16              $221, 821. 61   $2, 826. 74
Cost of maintenance ------------  -   -- $128, 639. 03 53, 371. 89                 2, 998. 59   57, 733.91      $71, 165. 58

      Total cost ____ _.. . ....------
                                    -         128, 639. 03    158, 324.   05     224, 820. 20   60, 560. 65      71, 165. 58

Total expended___-------------------           51, 110. 35    231, 199. 51       398, 232. 36    6, 531. 95 -177,     303. 73

Allotted..._----------                         233, 200. 00
                               ...----------------            415, 000. 00     -186, 630. 00    58, 553. 35      71, 073. 24


Balance unexpended July 1, 1933_                                  --            -          --    -___ $349, 514. 77
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934-------------------    $165, 00. 00
Amount allotted from War Department Appropriation
Act approved Apr. 15, 1926----------------------   23, 080. 71
Amount allotted from War Department Appropriation
Act approved March 4, 1933----------------------   37,000. 00
                                                                                                          225, 080. 71
Amount to be accounted for-----------------------------------    574, 595. 48
Deductions on account of revocation of allotment----------------154, 007. 47

         Net amount to be accounted for_--------                                                          420, 588. 01
  1 After   deducting $47.69 to adjust amount reported in 1933 Annual Report.
  2After    adding $15,144.76 to adjust amount reported in 1933 Annual Report.
        RIVERS AND HARBORS-FIRST NEW YORK, N.                  Y., DISTRICT         133
Gross amount expended-____ch_______                      $843, 725. 36
Less:
    Reimbursements collected -_-_-  $1, 019, 858. 53
    Receipts from sales------------       1, 170. 56
                                                       1, 021, 029. 00
                                                                         -$177,   303. 73
       Balance unexpended June 30, 1934_                                    597, 891. 74
,Outstanding liabilities June 30, 1934---------------------------           100, 600. 95

      Balance available June 30, 1934___             -                      497, 290. 79
Accounts receivable June 30, 1934--------------------------                 101, 611. 71

        Unobligated balance available June 30, 1934___          --          598, 902. 50
Amount that can be profitably expended in fiscal year ending
                                1
June 30, 1936, for maintenance                                             165, 000. 00

                     15. CONEY ISLAND CHANNEL, N. Y.

   Location.-This channel is situated in New York Harbor, Lower
Bay, about 9 miles south of the Battery, New York City. The
channel is shown on United States Coast and Geodetic Survey Chart
No. 369, but it is not named.
   Existing project.-This provides for a channel 600 feet wide and
20 feet deep at mean low water, and 7,000 feet long between 20-foot
contours. Mean tidal range, 4.7 feet; mean range of spring tides,
5.6 feet; irregular fluctuations due to wind and barometric pressure
vary from 4 feet below mean low water up to 4 feet above mean high
water. The estimate of cost for new work, made in 1906, is $168,300.
The latest (1928) approved estimate for annual cost of maintenance
is $12,000.
   The existing project was adopted by the River and Harbor Act
of March 2, 1907 (H. Doc. No. 442, 59th Cong., 2d sess.). The latest
published map is in the project document.
   Terminal facilities.-There is a privately owned pier built out
from the Coney Island shore for summer passenger travel; it does
not extend to the channel. It is sufficient for this use. Commer-
cially the channel is part of the water route between New York Har-
bor and Jamaica Bay and points east along the southern shore of
Long Island. (For further details see Port Series No. 20, Corps of
Engineers.)
   Operations and results during fiscal year.-The U. S. sea-going
dredge Marshallwas employed in Coney Island Channel, dredging to
%0feet, from August 7 to September 16, 1933, removing a total of
128,336 cubic yards, bin measurement, of sand, at a total cost and
(expenditure of $21,845.21, all for maintenance.
   Condition at end of fiscal year.-The project is about 66 percent
completed. The channel in its western end was dredged in 1913 to
a depth of 20 feet at man low water and width of 400 to 600 feet;
no work has been done on the shoal in its eastern end. When ex-
amined in October 1932, project depth existed for the entire length
of the project through a channel varying in width from 250 to 600
feet. The work remaining to be done consists in increasing the
channel to its full project width, but it is not contemplated to under-
take this work for the present. The total costs and expenditures
to June 30, 1934, were $307,844.87-$111,371.21 for new work and
$196,473.66 for maintenance.
1Exclusve of available funds.
134       REPORT        OF   CHIEF OF ENGINEERS, U.                     S. ARMY,           1934

   Proposed operations. No funds are available and no operations,
are contemplated during the fiscal years 1935 and 1936.
                                 Cost and financial sunvmary
Cost of new work to June 30, 1934-----------------------------                                  $111, 371. 21
Cost of maintenance to June 30, 1934----------------------_                                _     196, 473. 66
      Total cost of permanent work to June 30, 1934-------------                                 307, 844. 87
Net total expenditures -----------------------------------------                                 307, 844. 87
Total amount appropriated to June 30, 1934-....                                                  307, 844. 87

        Fiscal year ending June 30             1930         1931          1932           1933            1934


Cost of new work___
Cost of maintenance     ------------------$79, 634. 08 $38, 458. 39       $402. 14    $1, 885. 09      $21, 845. 21
Total expended-------------------------      64,879. 05   55, 128. 16      257. 85      2, 069. 00      21, 845. 21

Allotted.........------------------------98, 200. 00      22, 500. 00   _.--------   -22, 000. 34       21, 845. 21



Amount allotted from War Department Appropriation Act, Feb. 23,
1931---------------------------------------------------------$946. 01
Amount allotted from War Department Appropriation Act approved
Mar. 4, 1933------------------------------------------------   20, 900.00
      Amount to be accounted for------------------------------                                       21, 846. 01
Deductions on account of revocation of allotment---------------                                              .80
      Net amount to be accounted for___--                                                            21, 845.21
Gross amount expended_____________________________                                                   21, 845. 21
Amount (estimated) required to be appropriated for completion of
existing project ---------------------------------------------  56, 000. 00

              16. BAY RIDGE AND RED HOOK CHANNELS, N. Y.

  Location.-These channels lie along the east shore of the Upper
Bay, New York Harbor, and, with Buttermilk Channel, form an
easterly channel along the Brooklyn water front from the Narrows
to East River. (See U. S. Coast and Geodetic Survey Chart No.
541.)
  Previous projects.-Adopted by acts of March 3, 1881, August 11,
1888, September 19, 1890, August 18, 1894, and June 3, 1896. The
total cost and expenditure amounted to $1,246,100. For further
details see page 1768 of Annual Report for 1915.
   Existing project.-This provides for a channel 1,200 feet wide and
40 feet deep at mean low water from the Narrows to Bay Ridge,
Avenue, Brooklyn, thence 1,750 feet wide to the junction of Bay
Ridge and Red Hook Channels, thence 1,200 feet wide through Red
Hook Channel to the junction with Buttermilk Channel, and from
the junction of Bay Ridge Channel with Red Hook Channel nar-
rowing uniformly in width to about 500 feet wide off Twenty-eighth
Street, Brooklyn. Length of section included in the project, 41/2:
miles. Mean tidal range, 4.7 feet; mean range of spring tides, 5.6
feet; irregular fluctuations due to wind and barometric pressure vary
from 4 feet below mean low water up to 4 feet above mean high
water.
      RIVERS AND HARBORS-FIRST NEW YORK, N.           Y., DISTRICT   135
   The estimate of cost for new work, revised in 1930, is $4,609,000,
exclusive of amounts expended on previous projects. The latest
 (1930) approved estimate for annual cost of maintenance is $150,000.
   This project was adopted in specific terms by River and Harbor
Act of March 3, 1899, no prior estimates for channels of these dimen-
sions having been published. A report upon a survey of these chan-
nels showing the depths in 1897 was printed on page 1177 of the
Annual Report for 1897 and in House Document No. 337, Fifty-
fourth Congress, second session, with map. The River and Harbor
Act of 1907 authorized prosecution of the work so as to obtain, first, a
'depth of 35 feet, subsequently increasing the depth to 40 feet for the
full width, in accordance with the project of 1899; this permitted a
change in the order of the work without a change in the project.
The River and Harbor Act of July 3, 1930, provided for the widening
&ofBay Ridge Channel to 1,750 feet (Rivers and Harbors Committee
-Doc. No. 44, 71st Cong., 2d sess., this document containing the latest
published map).
    Terminal facilities.-There are 76 piers and bulkheads used by
shipping interests along the water front of these channels. The
terminal facilities occupy practically all of the available wharf room
along the water front, and they are mostly of modern equipment.
  (For latest full description of terminal facilities see Port Series No.
:20, Corps of Engineers.)
             OPERATIONS AND RESULTS DURING FISCAL YEAR

   Regular funds.-The U. S. sea-going dredges Navesink and At-
lantic were employed during the period July 1 to September 30,
1933; and the U. S. sea-going dredges Marshall, Raritan, and At-
.lantic were employed during the period March 19 to June 12, 1934,
in dredging Bay Ridge Channel to 40 feet, removing a total of
599,754 cubic yards, bin measurement, of material, at a total cost
of $104,681.25 for maintenance.
   The cost of surveys and contingencies was $6,129.54--$767.95 for
,new work and $5,361.59 for maintenance.
   The total cost was $110,810.79-$767.95 for new work and $110,-
042.84 for maintenance. The expenditures were $125,198.24.
   Public Works funds.-The U. S. sea-going dredges Atlantic and
Raritan were employed during the period October 1 to December
16, 1933, in widening Bay Ridge Channel, removing a total of
409,256 cubic yards, bin measurement, of material, at a cost and
expenditure of $64,559.68 for new work.
   The total cost, all funds, was $175,370.47-$65,327.63 for new work
and $110,042.84 for maintenance.
   The total expenditures were $189,757.92.
    Condition at end of fiscal year.-The existing project is 85 percent
completed. Red Hook Channel has been dredged to project depth
and width for a length of 3,000 feet northward from its junction
with Bay Ridge Channel and thence 1,000 feet wide and from 38 to
40 feet deep at mean low water a farther distance of 3,500 feet.
About 72 percent of the work of widening Bay Ridge Channel to
1,750 feet from Bay Ridge Avenue to its junction with Red Hook
Channel has been completed. The controlling mean low-water
depths as shown by examinations made in July to September 1933,
136     REPORT OF CHIEF OF ENGINEERS,             U.   S.   ARMIY,   19.34

December 1933 to January 1934, and July to August 1934, are as
follows: In Bay Ridge Channel from deep water in the Narrows,
along the Brooklyn waterfront from Ninety-first Street to Fifty-
ninth Street, through a navigable channel varying in width from
200 to 1,400 feet, 40 feet deep; to Thirty-ninth Street through a
channel 1,200 feet wide, thence to Twenty-eighth Street, through a
channel 500 feet wide, 35 feet. In Red Hook Channel, from its
junction with Bay Ridge Channel to its junction with Buttermilk
Channel through a channel varying in width from 200 to 1,200 feet,
it is 32 feet, as shown by an examination made in July 1934. To
complete the project, about 3,500 feet in length of the upper portion
of Red Hook Channel is to be widened from the width of 1,000 feet
secured in the first dredging to the project width of 1,200 feet, and
complete the widening of Bay Ridge Channel to 1,750 feet from,
opposite Bay Ridge Avenue to its junction with Red Hook Channel.
The total cost to June 30, 1934, was $5,438,336.62-$3,864,136.56 for
new work and $1,574,200.06 for maintenance. The total expenditures
amounted to $5,437,122.78.
   With Public Works funds the widening to 1,750 feet from Bay
Ridge Avenue to the junction with Red Hook Channel, authorized
by act approved July 3, 1930, previously commenced, has been con-
tinued. It is about 72 percent completed. The costs and expendi-
tures were $64,559.68 for new work.
   The total cost, all funds, was $5,502,896.30-$3,928,696.24 for new
work and $1,574,200.06 for maintenance. The total expenditures
were $5,501,682.46.
   Proposed operations.-The balance unexpended, including ac-
counts receivable, at the end of the fiscal year, amounting to $204,-
576.21, will be applied as follows:
Accounts payable June 30, 1934---------------------------------    $1, 698. 08
Maintenance: Operate 2 United States sea-going dredges for a total
  of 10 dredge-months (November 1934 to June 1935)-----------202, 878. 15

      Total-------------------------------------------------            204, 576. 21
  The balance unexpended at the end of the fiscal year of allotment
from the National Industrial Recovery Act of 1933, amounting to
$110,440.32, will be applied to operation of one United States sea-
going dredge to complete the widening in Bay Ridge Channel along
the west side of the existing channel from Bay Ridge, Brooklyn, to
the junction of Bay Ridge and Red Hook Channels during the
period, September to December 1934.
  The dredging for maintenance will partially restore Bay Ridge-
and Red Hook Channels where previously dredged to project depth.
The dredging for improvement will complete about 80 percent of the
widening of Bay Ridge Channel authorized by the act of July
3,1930.
  It is believed that further work of improvement to complete Red
Hook Channel will not be required during the next 2 years. Main-
tenance dredging will be necessary in Bay Ridge Channel and in
parts of Red Hook Channel. The sum of $150,000 can be profitably
expended during the fiscal year ending June 30, 1936, in maintenance
dredging by the operation of one United States seagoing dredge for
          RIVERS AND: HARBORS-FIRST NEW YORK, N. Y., DISTRICT                                                     137
10 months (July 1934 to April 1935). This dredging should restore
Bay Ridge and Red Hook Channels where previously dredged to
project dimensions.
                                       Cost and financial summary

                               MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934________________________ $5, 110, 236. 56
Cost of maintenance to June 30, 19341____________-
                                               -     -   _ 1, 574, 200. 06

      Total cost of permanent work to June 30, 1934_ ______-                                          6, 684, 436. 62
                                          --
Plus accounts receivable June 30, 1934__________             __                                               484. 22

     Gross total costs to June 30, 1934____________                                                   6, 684, 920. 84
Minus accounts payable June 30, 19.34 _______________1__                                            -___ 1, 698. 06

     Net total expenditures _6__________----___-----                                                  6, 683, 222. 78
Unexpended balance June 30, 1934__                                                                       204, 091. 99

         Total amount appropriated to June 30, 1934 _______                                   __-     6, 887, 314. 77

    Fiscal year ending June 30                1930            1931            1932             1933            1934


Cost of new work                 ._____-____
                               -___--....             -$110, 810. 51       $441,400. 02    $212, 259. 50         $767. 95
Cost of maintenance--...-_ _..-.        $278, 025. 66     245, 146. 70           70. 63      70, 151. 56      110, 042. 84
      Total cost ...........        ..---------------
                                             278, 025. 66   355, 957. 21    441, 470. 65    282, 411.06       110, 810. 79
Total expended---............._.           286, 057. 72     318, 788. 46    473, 442. 54    294, 539. 53      125, 198. 24
Allotted --....--------------.--.          397, 500. 00     384, 000. 00    171, 200. 00    299, 670. 34      286, 729. 48



Balance unexpended July 1, 1933_________________________      _ $42, 560. 75
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934_____________________  $200, 000. 00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933 _______- _________--
                                           -       127, 000. 00
                                                                327, 000. 00

     Amount to be accounted for________--________ -         _ 369, 560. 75
Deduction on account of revocation of allotment ----- _______ 40, 270. 52
      Net amount to be. accounted for-----------------------329,         290.23
Gross amount expended_-...     ____               _ -159, 905. 75
                                        -__________
Less reimbursements collected                           34, 707. 51
                                                                    125, 198. 24

      Balance unexpended June 30, 1934______________________ 204, 091. 99
Outstanding liabilities June 30, 1934 ____________________ __  1, 698. 06
      Balance available June 30, 1934__________________--_     202, 393.93
Accounts receivable June 30, 1934______________-____ - - -____-_    484. 22

         Unobligated balance available June 30, 1934______________ 202, 878. 15

Amount (estimated)              required to be appropriated for completion of
   existing project 1________________                                                                      589, 800. 00

Amount that can be profitably expended in fiscal year ending June
                           1
30, 1936, for maintenance __         ______1----------------50, 000.00

   1Exclusive of available funds.
138          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                                           1934

                                                   PUBLIC WORKS FUNDS
Cost of new work to June 30, 1934 _______________________________ $64, 559. 68
,Cost of maintenance to June 30, 1934

         Total cost of permanent work to June 30, 1934___________ __                                                                   64, 559. 68
Net total expenditures ----------------------------------------- 64, 559. 68
Jnexpended balance June 30, 1934_______________________________ 110, 440. 32

         Total amount appropriated to June 30, 1934_______________175, 000. 00

         Fiscal year ending June 30                            1930                 1931                    1932             1933              1934


Cost of new work _---------------___           ------.---------.                                     ---.      --------.--                   $64, 559. 68
Cost of maintenance------------------------------------
Total expended----------                       ------------               ------------------------------                                      64, 559. 68
Allotted_                         -        -                  --         ____ ______            _______             ______          ____     175, 000. 00


Amount allotted from National Industrial Recovery Act approved
  June 16, 1933-    ___                                                                                                              $175, 000. 00
Gross amount expended___                              ---                                                   $79, 174.84
Less reimbursements collected-                                     --                                         14, 615. 16
                                                                                                                                           64, 559. 68

          Balance unexpended                      June 30, 1934                                                                       110, 440. 32
   CONSOLIDATED          COST AND              FINANCIAL           SUM MARY               FOR BAY             RIDGE AND              RED     HOOK
                                                            CHANNELS,          N.    Y.

Cost of new work to June 30, 1934----------------------------$5,174, 796. 24
Cost of maintenance to June 30, 1934                                                      --          -----                       1, 574, 200.06

      Total cost of permanent work to June 30, 1934__-                                                             ----           6, 748, 996. 30
Plus accounts receivable June 30, 1934----                                                                                                484. 22

     Gross total costs to June 30, 1934_-                                                                                         6, 749, 480. 52
Minus accounts payable June 30, 1934                                                                                                    , 698. 06
                                                                                                                                       1------------------------

            Net   total expenditures-_                             -                                                              6, 747, 782. 46
Unexpended balance June 30, 1934 ----                                           -                                                     314, 532. 31

            Total amount appropriated to June 30, 1934______________ 7, 062, 314. 77

    Fiscal year ending June 30                      1930                 1931                     1932                    1933                 1934


Cost of new work__ ______________                                  $110,810.51               $441, 400. 02          $212, 259. 50            $65, 327. 63
Cost of maintenance_ ..-- -_- -                $278, 025. 66        245, 146. 70                    70. 63            70, 151. 56            110, 042. 84

       Total cost_------------                  278, 025. 66           355, 957. 21            441, 470. 65           282, 411. 06           175, 370. 47

Total expended ..      _----_     ---           286, 057. 72           318, 788. 46            473, 442. 54           294, 539. 53           189, 757. 92

Allotted-------------
                    .           --------        397, 500. 00           384, 000. 00            171, 200. 00           299, 670. 34           461, 729.48


Balance unexpended July 1, 1933__________ __________________        $42, 560. 75
Amount allotted from War Department appropriation act,
  approved Apr. 26, 1934-----------------------------  $200,000
Amount allotted from War Department appropriation act,
  approved Mar. 4, 1933                                  27, 000
                                                        1-------------------------------
Amount alloted from National Industrial Recovery Act,
  approved June 16, 1933------------------------------  175, 000
                                                                    502, 000. 00

      Amount to be accounted for_ __-------------                                                                                      544, 560. 75
Deductions on account of revocation of allotment ---------------                                                                       40, 270. 52

            Net amount to be accounted for_ ___----                                          -----------------                         504, 290. 23
        RIVERS AND HARBORS-FIRST                   NEW YORK, N.         Y., DISTRICT         139

Gross amount expended --------------------------- $239, 080. 59
Less reimbursements collected---------------------- 49, 322. 67
                                                                                     $189, 757. 92

      Balance unexpended June 30, 1934-------------------------314, 532. 31
Outstanding liabilities June 30, 1934----- ---------------- ---- 1 1, 698. 06
     Balance available June 30, 1934---------------------------                       312, 834. 25
Accounts receivable June 30, 1934 ......---                                                484. 22

        Unobl gated balance available June 30, 1934----------------                   313, 318.47

Amount ( estimated) required to be appropriated for completion
                     1 ---- - - - - - - - - - - - - - - - - - - - - - - - - - -- -
of existing project                                                                  589, 800. 00

Amount that can be profitably expended in fiscal year ending June
   30, 1936, for maintenance 1___________________________________                     150, 000. 00)

                           17. BUTTERMLK CHANNEL, N. Y.
   Location.-This channel connects deep water in the Upper Bay,
New York Harbor, southwest of Governors Island, with deep water
in East River northeast of Governors Island, and with Bay Ridge
and Red Hook Channels forms an easterly channel along the Brook-
lyn water front from the Narrows tb East River. It lies between
Governors Island and Brooklyn Borough, New York City. (See
U. S. Coast and Geodetic Survey Charts Nos. 541 and 745.)
   Previous projects.-Adopted by the acts of June 14, 1880, July
13, 1892, and June 3, 1896. The total cost and expenditures were
$496,250. For further details see page 206, Annual Report for 1932.
   Existing project.-This provides for a channel 1,200 feet wide and
not less than 30 feet deep at mean low water, connecting deep water
in the Upper Bay southwest of Governors Island with deep water
in the East River northeast of Governors Island. Length of section
included in the project, 21/4 miles. Mean tidal range, 4.5 feet; mean
range of spring tides, 5.5 feet; irregular fluctuations due to wind and
barometric pressure vary from 4 feet below mean low water up to 4
feet above mean high water.
   The estimated cost of new work for a channel 40 feet deep and
1,200 feet wide revised in 1933 is $2,200,000, exclusive of amounts
expended on previous projects. The latest (1927) approved estimate
for annual cost of maintenance is $20,000.
   This project was adopted by the River and Harbor Act of June 13,
1902 (H. Doc. No. 122, 56th Cong., 2d sess.). For latest published
map see House Document No. 44, Sixty-third Congress, first session.
   Terminal facilities.-There are 37 terminals with a length of
36,253 feet of available dockage, comprising 24 open-pile piers, 4
crib and concrete bulkheads, 3 open-pile wharves, 4 railroad float
bridges, and 2 timber ferry racks. (For latest full description of
terminal facilities see Port Series No. 20, Corps of Engineers.)
                  OPERATIONS AND RESULTS DURING FISCAL YEAR

  Regular funds.-Under a contract for dredging to a depth of 40
feet, work commenced February 15, 1933, was in progress at the end
of the fiscal year 1934. The material removed during the fiscal year
was 1,123,278 cubic yards, place measurement, at a cost of $218,-
647.17 for new work. The contract is about 76 percent completed.
   1 Exclusive of available funds.
140     REPORT OF CHIEF        OF ENGINEERS,      U.     S. ARMY,             1934


    Under a contract for work of deepening an area to a depth of 40
feet, trenching for and relaying cables and water mains, work comn-
menced June 27, 1933, was completed February 8, 1934. There were
removed 111,888 cubic yards, place measurement of all material at
a cost of $45,166.82 for new work. The cost of removing and relay-
ling the cables and water mains and for backfilling was $97,537.91
lor new work.
    The cost of preliminary surveys preparatory to operations under
the above contracts was $3,989.62.
   The total cost of all work, including an adjustment of minus
$1,555.24 for survey costs transferred to costs under Public Works
funds, was $363,786.28 for new work. The expenditures were
$355,754.50.
    Public TVorks funds.-Under a contract for dredging and rock
removal for a widened entrance at the junction of Buttermilk Chan-
nel with East River, work was commenced October 25, 1933, and
completed May 29, 1934. There were removed 6,335 cubic yards of
rock and 27,572 cubic yards of other material, place measurement,
at a cost of $119,328.83 for new work. The cost of surveys and
contingencies was $2,722.41 for new work. The total cost of work
was $122,051.24, all for new work. The expenditures were
 $119,636.26.
    The total cost, all funds, was $485,837.52 for new work. The total
expenditures were $475,390.76.
    Condition at end of fiscal year.-The project is about 32 percent
completed. When examined in April 1933, to June 1934, the con-
trolling mean low-water depth was 40 feet through a channel 500
feet wide from deep water at southerly entrance from Anchorage
Channel to the junction of Buttermilk Channel with East River,
except for the middle stretch of about 3,000 feet where it is 30 feet.
The westerly 700-foot width is about 20 feet deep for the full length
of the channel except along the westerly channel line opposite Atlan-
tic Basin and adjacent to Governors Island where it is 10 feet deep
and less. The work of deepening the channel to 40 feet at mean
low water for a width of 500 feet from Anchorage Channel to East
River is about 90 percent completed. The work remaining to be done
to complete the project consists in increasing the depth of the chan-
nel to 40 feet at mean low water, with project width of 1,200 feet by
dredging and rock removal. The total costs have been $750,101.61-
 $589.213.04 for new work and $160,888.57 for maintenance. The ex-
penditures were $710,751.89, all regular funds.
    With Public Works funds the 500-foot channel has been widened
at the junction with East River. The total cost was $122,051.24 for
new work. The expenditures were $119,636.26.
    The total cost of all work to June 30, 1934, was $872,152.85-
 $711,264.28 for new work and $160,888.57 for maintenance. The
total expenditures were $830,388.15.
    Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $149,114.69, will be applied as follows:
Accounts payable June 30, 1934_      ______--------------------------- $39, 349.72
New work, complete by Nov. 30, 1934, under a contract in
  force, dredging a channel 500 feet wide from the Upper Bay to
  East River-     -   -   -    -   -       ___-___
                                              -_--    -    __ --       109,764.97

      Total                                            _-----------------
                                                                       -_--     _149,114. 69
            RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT                                                                     141
   The balance unexpended at the end of the fiscal year, amounting
to $11,363.74, of allotment from the National Industrial Recovery
Act of 1933, will be applied as follows:
Accounts payable June 30, 1934--------------------------------$2, 414.98
Balance remaining     ------------------------------------ 8,948. 76
           Total                    -----------------------------------                        ___                          11, 363.74
   Further widening beyond the 500-foot width is not considered
necessary in the next 2 years. The channel already deepened should
be maintained. Therefore, the sum of $20,000 can be profitably
expended in this work during the fiscal year ending June 30, 1936,
'by the operation of one United States seagoing dredge for 1 month
to remove a shoal near the junction with Anchorage Channel.
                                          Cost and financial summary

                                 MAINTENANCE                AND      IMPROVEMENT                FUNDS


<Costof new work to June 30, 1934-           _                                                                     $1, 085, 463. 04
Cost of maintenance to June 30, 1934 ----------------------                                                            160, 888. 57
           Total cost of permanent work to June 30, 1934 ---------                                                      , 246, 351. 61
1inus accounts payable June 30, 1934----------------------                                                                 39, 349. 72
       Net total expenditures---------------- ---------------                                                       1, 207, 001. 89
J'nexpended balance June 30, 1934-.......                                                                             149, 114. 69
           Total amount appropriated to June 30, 1934                                      -            -            1, 356, 116. 58

          Fiscal year ending June 30                          1930              1931             1932            1933           1934


Cost of new work-_---------------------_------------$4,                                           987. 69 $129, 885. 86      $363, 786. 28
Cost of maintenance.------------------                      $5, 066. 22          $62. 48           58. 73

        Total cost---------------------------                5, 066. 22           62. 48        5, 046. 42   129, 885. 86     363, 786. 28

Total expended------         -----------------               5, 068. 34 ---            -        1, 955. 15   102, 274. 88     355, 754. 50
Allotted ...............---------------------------       -32, 700. 00        45, 000. 00 -34, 900. 00       628, 282. 29    -29, 283. 15



Balance unexpended July 1, 1933------------------------------     $534, 152.34
Deductions on account of revocation of allotment- ---------------   29, 283. 15

       Net amount to be accounted for--------------------------                                                         504, 869.19
.Gross amount expended---------------------------    $358, 261. 75
Less reimbursements collected----------------------    2, 507. 25
                                                                                                                        355, 754. 50

      Balance unexpended June 30, 1934------------------------                                                          149, 114. 69
Outstanding liabilities June 30, 1934-------------      553. 21
Amount covered by uncompleted contracts --------   148, 561. 48
                                                                                                                        149, 114. 69

Amount (estimated) required              to be appropriated           for completion
                      -- - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - -
of existing project 2                                                                        - 1, 378, 900. 00

Amount that can be profitably _expended in fiscal year ending June
                                                               _
   30, 1936, for maintenance 2_                       ___ ____--          _______
                                                                                ---                                         20, 000. 00

   1After adding $553.21 to adjust amount reported in 1933 Annual Report.
   2 Exclusive of available funds.
142             REPORT OF CHIEF OF ENGINEERS, U. S. ARMIVY                                                         1934

                                                PUBLIC WORKS               FUNDS
Cost of new work to June 30, 1934_            ----------                                                                $122, 051.24'
Cost of maintenance to June 30, 1934____________
     Total cost of permanent work to June 30, 1934-----------                                                            122, 051. 24
Minus accounts payable June 30, 1934--------------------------                                                             2, 414.98
           Net total expenditures_________________________                                               _               119, 636. 26
Unexpended balance June 30, 1934 ________________________11,                                                                  363. 74
           Total amount appropriated to June 30, 1934______________                                                     131, 000. 00

           Fiscal year ending June 30                     1930             1931              1932                1933           1934

Cost of new work -----------------------------------------------                                                            $122, 051. 24
Cost of maintenance------------------                                                                                            --
Total expended---------------              ------------    I------------                 ------------------------            119, 636. 26
Allotted .....-----------------             -                                             -131,                                   000. 00


Amount allotted from National Industrial Recovery Act approved
June 16, 1933------ -------                                   $131, 000. 00
Amount to be accounted for _______---______---------___--                                                                131, 000. 00,
Gross amount expended_________    ____-_____________                                                                     119, 636. 26
      Balance unexpended June 30, 1934_____________----                                                                   11, 363. 74
Amount covered by uncompleted contracts_____- _____ _____                                                                 10, 934. 15
      Balance available June 30, 1934--------------------------                                                               429. 59

   CONSOLIDATED COST AND FINANCIAL SUMMARY FOR BUTTERMILK                                                     CHANNEL, N. Y.


Cost of new work to June 30, 1934__ ___-_                                                                          $1, 207, 514.       28
Cost of maintenance to June 30, 1934 ________________________                                                           160, 888. 57
     Total cost of permanent work to June 30, 1934                                        ----------                1, 368, 402. 85
Minus accounts payable June 30, 1934_______________-- ____                                                              41, 764. 70
     Net total expenditures-______-1---   ____-________                                                             1, 326, 638. 15
Unexpended balance June 30, 1934____ ______________________                                                            160. 478. 43
     Total amount appropriated to June 30, 1934----------                                                           1, 487, 116. 58

           Fiscal year ending June 30                     1930             1931              1932               1933           1934


Cost of new work _____---           ---                               _-_---              $4, 987. 69 $129, 885. 86         $485, 837. 52
Cost of maintenance----------------------            $5, 066.22                $62.48          58.73          -              ----------
       Total cost-------------------------             5, 066. 22               62. 48      5,046. 42        129, 885. 86    485, 837. 152
Total expended .--------------------------             5, 068:. 34   -----------            1, 955. 15       102, 274. 88    475, 390. 76

Allotted----. --------------.----------------        32, 700. 00       45, 000. 00 -34, 900. 00              628, 282. 29    101, 716. 85


Balance unexpended July 1, 1933____    ___________-------------                                                         $534, 152. 34
Amount allotted from National Industrial Recovery Act approved
  June 16, 1933   ______________----------------                                                                         131,000.00i
      Amount to be accounted for ___-_                                                                                   665, 152. 34
Deductions on account of revocation of allotment______------                                                              29, 283. 15
      Net amount to be accounted for6_____                    ___35,                                                           869.19
Gross amount expended_ _____ ___-_---------                  $477, 898.01
Less r.imbursements collected---------------------              2, 507. 25
                                                                                                                        475, 390. 76
           Balarnce unexpended June 30, 1934_____________---__                                                 _        160, 478. 43.
   1After adding $553.21 to adjust amount reported in 1933 Annual Report.
        RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT                                    143
Outstanding liabilities June 30, 1934 ___                           $553. 21
Amount covered by uncompleted contracts----------                159, 495. 63
                                                                                     $160, 048. 84
       Balance available June 30, 1934-------------------------                            429. 59
Amount (estimated) required to be appropriated for completion
  of existing project                  ----------------                              1, 378, 900.00

Amount that can be profitably expended in fiscal year ending
                         -- - -- - -- - -- -- - -- - -- - -- - -- -- - -- - --   -
1936, for maintenance                                                                 20, 000. 00
                    18. GOWANUS CREEK CHANNEL, N. Y.
   Location.-Gowanus Creek is a small tidal inlet extending north-
easterly about 11/2 miles from the north end of Bay Ridge Channel.
The channel is shown on U. S. Coast and Geodetic Survey Chart
No. 369, but is not named; entrance is shown on Chart No. 541.
   Previous projects.-Adopted by acts of March 3, 1881 (under the
title of " Gowanus Bay "), August 11, 1888, and September 19, 1890.
The costs and expenditures are estimated at $75,000. It is imprac-
ticable to estimate how much of this sum was applied to maintenance.
For further details see Annual Report 1915, page 1769.
   Existing project.-This provides for a channel 26 feet deep at
mean low water, extending eastward from the end of Bay Ridge and
Red Hook Channels at Twenty-eighth Street, for a distance of
about 2,900 feet to the foot of Percival Street, with width decreasing
from about 300 feet at its outer or western end to 200 feet at its
inner end, and thence to Hamilton Avenue Bridge, 18 feet deep at
mean low water, and gradually reducing in width to 100 feet at
the bridge, all as limited by harbor lines. Mean tidal range, 4.7 feet;
mean range of spring tides, 5.6 feet; irregular fluctuations due to
wind and barometric pressure vary from 4 feet below mean low
water up tb 4 feet above mean high water.
    The estimate of cost for new work made in 1896 was $70,000,
exclusive of amounts expended under previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $6,000.
    The existing project was authorized by the following river and
harbors acts: The act of March 3, 1881, provided for the 18-foot
channel, and the act of June 3, 1896, provided for the 26-foot chan-
nel (Annual Report 1896, p. 155). For latest published map of
Gowanus Creek see Annual Report for 1903, page 919.
    Terminal facilities.-There are 123 piers and bulkheads used by
shipping interests along the water front of this waterway and
Gowanus Canal, 4 of which are owned by the State of New York
as a barge canal terminal, including a large grain elevator, 14 are
owned by the city of New York, 25 are owned and in use by 5
shipyards; the remainder are either privately or corporately owned
and used for various commercial purposes. Two are open to the
public; none has rail connections. These terminals occupy prac-
tically the whole of the water front. (For latest full description
of terminal facilities, see Port Series No. 20, Corps of Engineers.)
    Operations and results during fiscal year.-None.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1904. The channel was restored to project depth in 1921.
  1Exclusive of available funds.
      91536-ENG 1934-10
144           REPORT OF         CHIEF OF ENGINEERS, U.                     S. ARMY,       1934

When examined in July 1931, the controlling mean low water depth
was 24 feet from the entrance up to Percival Street, thence to Hamil-
ton Avenue Bridge, the head of improvement, it is 17.5 feet deep
through a channel gradually reducing in width to about 100 feet.
The total costs and expenditures were $110,947.58-$70,000 for new
work and $40,947.58 for maintenance.
  Proposed operations.-No funds are available and no operations
proposed during the fiscal year 1935.
  It is believed that dredging for maintenance will be necessary
during the fiscal year 1936. Therefore, the sum of $20,000 can be
profitably expended during that year in completing by November
30, 1935, under contract to be entered into, the removal of shoals from
the Henry Street Basin to the head of the project. The proposed
work will result in the restoration of the channel to project
dimensions.
                                    Cost and financial sunmary

Cost of new work to June 30, 1934_________________                                           $145, 000.00
Cost of maintenance to June 30, 1934 __________________                                  -___ 40, 947. 58
      Total cost of permanent work to June 30, 1934 ______.____                                 185, 947. 58
Net total expenditures   -----------------------------------                                    185, 947. 58
Total amount appropriated to June 30, 1934___                                                   185, 947. 58

           Fiscal year ending June 30           1930        1931              1932       1933        1934


Cost of new work.....---
Cost of maintenance..............__________      $76. 59    -$0. 05          $105. 34
Total expended-.............       -......    -... 53. 59     27. 20           105. 34

Allotted-_---------    ..----                                  _--------------$269.50            _




Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance__ --------------------------------     $20,000
                                        19. EAST RIVER, N. Y.

   Location.-This is a tidal strait about 16 miles long and 600 to
4,000 feet wide, connecting Hudson River and the Upper Bay at
the Battery, New York City, with Long Island Sound at Throgs
Neck, New York City, and separating Long Island from the main-
land. (See U. S. Coast and Geodetic Survey Charts Nos. 223, 226,
and 745.)
   Previous projects.-Adopted by acts of August 30, 1852, July 25,
1868, March 3, 1899, and June 25, 1910. Cost and expenditures
amounted to $6,225,357.45-$6,187,693.50 for new work and $37,-
663.95 for maintenance. For further details see page 210, Annual
Report for 1932.
   Existing project.-This provides for channels of the following
dimensions (depths refer to :mean low water): From deep water in
the upper New York Bay to the Brooklyn Navy Yard, 40 feet deep
and 1,000 feet wide; from the Brooklyn Navy Yard to Throgs Neck,
35 feet deep, with widths varying from about 550 feet to 1,000 feet,
according to locality; east of Welfare (Blackwells) Island up to
English Place, Long Island City, 30 feet deep and varying in widthl
      RIVERS AND HARBORS      FIRST NEW YORK, N.     Y., DISTRICT   145
from 500 feet to 900 feet, with widening in the approach from the
main channel; between South Brother and Berrian Islands, 20 feet
deep and 300 feet wide, with widening in the approach from the
main channel; for the removal of Coenties Reef to a depth of 40 feet,
also the removal of the following rocks and reefs lying outside of the
limiting lines of the main channel to give access to wharves: Along
the Brooklyn shore, Brooklyn Bridge to Manhattan Bridge (Fultcn
Ferry Reef), to a depth of 25 feet; Jay Street Reef, 25 feet; Corlears
Reef, 35 feet; Shell Reef, 25 feet; Horns Hook, 40 feet; Rhinelander
Reef, 26 feet; and reef off Oak Point, 30 feet; for the construction
of a dike in Pot Cove in Hell Gate. The length of the section in-
cluded in the improvement is about 16 miles. The mean range of
tides varies according to locality, from 4 feet at the Brooklyn Navy
Yard and 4.4 feet at the Battery to 5 feet at Hallets Point, 6.3 feet
at Port Morris, and 7.1 feet at the eastern entrance at Throgs Neck;
mean range of spring tides, 5.3, 6.1, 7.4, and 8.4 feet, respectively;
irregular fluctuations due to wind and barometric pressure vary
according to locality from 4 feet below mean low water at the
Battery, 3.5 feet at the navy yard, and 4 feet below at Throgs Neck
up to about 4 feet above mean high water at the Battery and 4.5 feet
above mean high water at Throgs Neck; extreme fluctuations do not
affect navigation interests adversely to a serious extent.
   The estimate of cost for new work, revised in 1933, exclusive of
amounts expended on previous projects, is $24,000,000. The latest
 (1921) approved estimate for annual cost of maintenance is $25,000.
   The existing project was authorized by the following river and
harbor acts: Public Resolution No. 67, Sixty-third Congress, third
session, March 3, 1915, provided for the removal of Coenties Reef
to a depth of 35 feet (H. Doc. No. 188, 63d Cong., 1st sess.), condi-
tioned upon local cooperation increasing the depth to 40 feet; the
act of July 27, 1916, provided for a channel 1,000 feet wide and 35
feet deep across Diamond Reef (H. Doc. No. 188, 63d Cong., 1st
sess.), and the acts of August 8, 1917, and July 18, 1918, provided
for a depth of 40 feet across Diamond Reef and through East River
and Hell Gate (H. Doc. No. 140, 65th Cong., 1st sess.), and for the
remaining items under the existing project (H. Doc. No. 188, 63d
Cong., 1st sess.) ; the River and Harbor Act of September 22, 1922,
modified the existing project by limiting the depth to be made in
the through channel between Brooklyn Navy Yard and Throgs Neck
to 35 feet, and provided for the removal of certain rocks and reefs
and the construction of a dike in Pot Cove (Rivers and Harbors
Committee Doc. No. 3, 67th Cong., 2d sess.). The latest published
map is printed in the last-mentioned document.
    Local cooperation.-Fullycomplied with.
    Terminal facilities.-Both shores of the East River from the Bat-
tery, Manhattan Borough, to Hunts Point, east of Hell Gate, a length
of about 12 miles, are occupied by 397 terminals except in limited
sections where access is prevented by eddies and swift currents or
by shoal water. The terminals consist of piers, bulkheads, ware-
houses equipped with modern appliances for handling freight,
modern coal piers, bridges for the transfer of cars to and from floats,
marine railways, drydocks, and ferry racks.
    In an endeavor to keep pace with the growing commerce of New
York Harbor, the city authorities are constantly adding to and im-
146    REPORT   OF CHIEF OF     ENGINEERS,    U.   S. ARMY,   1934


proving the terminals in the East River and elsewhere in the harbor.
(For, latest full description of terminal facilities, see Port Series
No. 20, Corps of Engineers.)
                OPERATIONS AND RESULTS DURING FISCAL YEAR

   Regular funds.-The following work was accomplished under
contract:
   Middle Ground.-Under a contract for dredging and rock removal
to a depth of 35 feet, work commenced March 14, 1933, was com-
pleted February 26, 1934. There were drilled and blasted 41,084
cubic yards of rock, and there were removed 55,540 cubic yards of
rock and 15,477 cubic yards of other material, place measurement,
at a cost of $405,770.85 for new work.
   Hell Gate, including Hallets Point, Ways, and Woolsey Reefs.-
Under a continuing contract for dredging and rock removal to a
depth of 35 feet, work was commenced July 7, 1932. There were
drilled and blasted during the fiscal year 16,090 cubic yards of rock,
and there were removed 32,109 cubic yards of rock and 18,860 cubic
yards of other material, place measurement, at a cost of $134,153.89
for new work. The contract is about 82 percent completed.
   Diamond Reef Channel and East Channel, Welfare (Blackwells)
Island.-Under a continuing contract for dredging and rock removal
to a depth of 30 and 40 feet in the East Channel and Diamond Reef
Channel, respectively, work in the East Channel was commenced
September 3 and completed December 20, 1932. Work in Diamond
Reef Channel was commenced September 22, 1932, and completed
August 2, 1933. There were removed during the fiscal year 259
cubic yards of rock and 287 cubic yards of other material, place
measurement, at a cost of $3,514.47 for new work.
    The following work was accomplished by use of Government plant
and hired labor:
    Diamond Reef Channel.-U. S. derrick boat E. R. 101 was em-
ployed in Diamond Reef Channel in the removal of isolated shoals to
a depth of 40 feet. Work was commenced Aug. 26 and terminated
Sept. 30, 1933. There were removed 195 cubic yards, scow measure-
ment, of broken rock, at a cost of $5,634.54 for maintenance.
    The cost of a survey was $216 for maintenance.
    The total cost was $549,289.75-$543,439.21 for new work and
$5,850.54 for maintenance. The expenditures were $665,866.64.
    Public Works funds.-The following work by contract was accom-
plished with funds provided by the Federal Emergency Administra-
tion of Public Works.
    South Brother-BerrianIsland Channel, and off Wards Island and
Hunts Point.--Undera contract dated October 10, 1933, for dredging
and rock removal to a depth of 20 feet and 35 feet, respectively, work
was commenced November 16, 1933. There were drilled and blasted
570 cubic yards of rocks, and there were removed 167 cubic yards of
rock and 33,723 cubic yards of other material, place measurement, at
a cost of $140,761.82 for new work. The contract is about 39 percent
completed.
  Jay Street Reef and Corlears Reef.-Under a contract for dredg-
ing and rock removal to a depth of 40 feet, work was commenced
October 25, 1933, and completed January 20, 1934. There were
      RIVERS AND IIARBORS-FIRST NEW YORK, N.        Y., DISTRICT   147
drilled and blasted and removed 145 cubic yards of rock and 5,133
cubic yards of other material, place measurement, at a cost of
$45,494.98 for new work.
   Shell Reef, main channel.-Under a contract for dredging and
rock removal to a depth of 35 feet, work was commenced January
4, 1934. There were drilled and blasted 7,858 cubic yards of rock,
place measurement, at a cost of $58,248.84 for new work. The con-
tract is about 10 percent completed.
   Shell Reef, 25-foot channel.-Under a contract for dredging and
rock removal to a depth of 25 feet, work was commenced February
28, 1934. There were drilled and blasted 1,461 cubic yards of rock,
and there were removed 27,332 cubic yards of other material, place
measurement, at a cost of $216,787.98 for new work. The contract
is about 84 percent completed.
   The following work was accomplished by use of Government plant
and hired labor:
   Hunts Point to Clason Point.-The U. S. sea-going dredge Rari-
tan was employed from May 21 to 26, 1934, and June 12 to 15, 1934,
removing a total of 9,355 cubic yards, place measurement, of mate-
rial, at a cost of $7,257.43 for new work.
   Diamond Reef Channel to Clason Point.-The U. S. derrick boat
E. R. 101 was employed intermittently during the fiscal year in the
removal of isolated shoals, large boulders, and rock points, between
the Battery and Clason Point. There were removed 400 cubic yards
of rock and 356 cubic yards of other material, scow measurement,
at a cost of $21,033.33 for new work.
   The cost of surveys and contingencies preparatory to dredging
and rock-removal work was $30,904.66 for new work.
   The total cost of all work under the National Industrial Recovery
Act of 1933 was $520,489.04 for new work. The expenditures were
$485,876.13.
   The total cost, all funds work, was $1,069,778.79--$1,063,928.25 for
new work and $5,850.54 for maintenance. The total expenditures
were $1,151,742.77.
   Condition at end of fiscal year.-The existing project is about 94
percent completed. About 75 percent of the work required to com-
plete the removal of Coenties Reef to the project depth of 40 feet
at mean low water had been accomplished when the contract for
doing the work was canceled on December 11, 1922.
   The controlling mean low water depth from deep water in the
Upper Bay to the Brooklyn Navy Yard is 37.5 feet; the width varies
as follows: At the Battery 400 feet, opposite Coenties Slip 600 feet,
and 900 feet wide to the navy yard. From the navy yard through
the west channel at Welfare (Blackwells) Island and Hell Gate to
Throgs Neck at Long Island Sound the controlling depth is 34.5
feet, varying in width from 550 to 1,000 feet. At Middle Ground
it is 35 feet through a channel 900 feet wide. In the channel between
South Brother and Berrian Islands it is 15.5 feet deep for a width
of 300 feet. In the adopted section of East Channel at Welfare
 (Blackwells) Island it is 30 feet deep, from off Newtown Creek to
English Place (now Forty-third Street), Long Island City, and
continuing through the natural east channel of navigable width to
deep water off the north end of Welfare (Blackwells) Island, it is
24 feet deep.
148             REPORT              OF      CHIEF            OF       ENGINEERS,                U.     S.   ARMY,            1934


     As a result of the work done under all projects, rocks and reefs
have been removed to the depths shown in the following table:

                                                                                 Distance        Least       Least        Former    Present
                                 Locality                                        by water       original    present      projected projected
                                                                                  Battery        depth       depth         depth    depth


                                                                                       Miles         Feet       Feet          Feet       Feet
I.   Battery Reef 1--.---------------                       -------      ----             0          12.8      1 26             26              26
2. South Ferry Reef _________                           _________                         0              17      19             26              26
3. Diamond Reef 2                        -----------                                                     15. 7   20. 3          25              25
4. Reef off Diamond Reef 2___                                                                            19      26             26              26
5. Coenties Reef 3________________                                                                       14. 3   31. 3          26              40
6. Fulton Ferry Reef 1___________                                                                        12      24. 3                          25
7. Jay Street Reef --                                                                  1-2      ---.....         16. 0                          25
8. Corlears Reef --------------------------------                                           2            11. 8   33.7    -                      35
9. Third Street Reef
                  --   4- ________                              -                           3            15. 9   27             19              25
10. Shell Reef 4     _________            _                           __               2-4                7. 5   21. 6          18              25
11. Pilgrim Rock _______________________________                                            3            12      25             25              25
12. Twenty-sixth Street Reef 5_______                                                       4            16. 1   25             26              25
13. Charlotte Reef 6___________________________                                             4            14. 7   30             26              30
14. Thirty-second Street Reef______________--__                                             42           28. 7   40             26              35
15. Ferry Reef 7                                                                            4%            7      35             26              35
16. Man-of-War Rock 4                                                                       44            0. 8   26             26              26
17. Horns Hook Reef__------------------------------                                         7            22      40                             40
18. Rhinelander Reef_________________ ___________                                           7%            9. 4   26             26              26
19. Middle Reef 4____________________________________                                       7             6      35             26              35
20. Heel Tap Rock-------------------------------                                            7%           12. 1   20. 5          26   -
21.. Hallets Point Reef 4___________________________                                        7%            4      31.6           35              35
22. Frying Pan Reef 4              __ -__    ____--       --           -          -         73_____7_______
                                                                                                          9      26             26              35
23. Pot Rock ..------------------------------------                                         8             8      35             26              35
24. Shell Drake Rock 4_8_______                                                             8             8      26             26              35
25. Ways Reef 4----8--------                                                                8%            5      26             26              26
26. Negro Point Reef 4                                                                      9             0      35             26              35
27. Reef C _--------------------------------------                                          9%           28. 2   28. 2                          40
28. Middle Ground 7          --                                                            10            11      35. 0          26              35
29. Reef off North Brother Island 7                                                        10%           16      34. 3          26              35
30. North Point of North Brother Island 4                                                  11             4. 3   35                             35
31. Reef off Oak Point 7                      ---------                                    11%           12. 6   30                             30
32. Rocks off Barretto      - - - - - 4- - - - - - - - - - - - - - - - - - - - - - -
                      - - -Point                                                           11-         ..        35                             35
33. Barretto Reef                                                                          11%           17      32. 8          26              35

  1 Such parts of these reefs as project into the deep-water channels are to be removed to the project depth
of 40 feet.
  2 Such parts of these reefs as project into the deep-water channel have been removed to the project depth
of 40 feet.
   3 Cost of removal to 40-foot depth to be paid by United States.
   4 Such parts of these reefs as project into the deep-water channel are to be removed to the project depth
of 35 feet.
  6Included in area no. 10 (Shell Reef) to be deepened to 25 feet.
  6 Included in the deep-water channel east of Blackwells Island for removal to the project depth of 30 feet.
  7 Included in the deep-water channel for removal to 35 feet.


  The work remaining to be done to complete the existing project
consists in completing to project depths the removal of isolated rock
points in the 40-foot channel between the Battery and navy yard;
the 35-foot channel between Shell Reef and Hell Gate; Coenties Reef
to 40 feet; Jay Street Reef to 25 feet; Shell Reef, Main Channel,
to 35 feet:; Shell Reef to 25 feet; construct a dike in Pot Cove in
Hell Gate; removal of rock in reefs off Wards Island and Hunts
Point to 35 feet; widen to 300 feet South Brother-Berrian Island
Channel to 20-foot depth; and widen the 35-foot channel between
Oak Point and Throgs Neck.
  The total costs have been $22,357,266.88-$22,070,422.36 for new
work and $286,844.52 for maintenance.        The expenditures were
$23,176,250.87, all regular funds.
  With Publie Works funds work (under the existing project) has
been :carried on in removing isolated rock shoals between the Battery
and Barretto Poit; widening of Jay Street Reef, 40-foot channel,
      RIVERS AND HARBORS---.IRST NEW YORK, N. Y., DISTRICT                      149
and a, shoal off Corlears Reef; widening of Shell Reef, Main Chan-
nel; widening of Shell Reef, 25-foot channel, widening of 35-foot
channel between Oak Point and Clason Point; widening of South
Brother-Berrian Island Channel; and the removal of rocks in reefs
off Wards Island and Hunts Point. About 35 percent of the work
being prosecuted with Public Works funds has been accomplished.
The total cost was $520,489.04 for new work.                The expenditures
were $485,876.13.
  The total cost of the existing project to June 30, 1934, all funds,
was $22,877,755.92-$22,590,911.40 for new work and $286,844.52 for
maintenance. The total expenditures amounted to $23,662,127.
  Proposed operations.-The balance unexpended,                  including        ac-
counts receivable, at the end of the fiscal year, amounting to $150,-
362.42, will be applied as follows:
Accounts payable June 30, 1934________________-___-_....______     _ $63, 760. 25
New work: Complete by Sept. 3, 1934, the widening of
  Hell Gate Channel at Hallets Point, Ways and Wool-
  sey Reefs under continuing contract in force by
  dredging and rock removal. Amount to be expended
  to compldte_ ---------------------------------        $52, 816. 00
Maintenance: Operate the U. S. derrick boat E. R. 101
in the removal of isolated shoals March to June 1935_ 16, 938. 90
                                                                      69, 754. 90
Balance remaining     ---------------------------------------         16, 847.27
       Total    --------------------------------------------             150, 362. 42
   The balance unexpended at the end of the fiscal year of allotment
from the National Industrial Recovery Act of 1933, together with an
additional allotment of $260,000 to be made by transfer and reallot-
ment, a total of $1,230,123.87, will be applied as follows:
Accounts payable June 30, 1934-----------------------------$34,               612. 91
New work :
    Complete by Aug. 23, 1934, the channel between
      South Brother and Berrian Islands and re-
      moval of shoals off Hunts Point and Wards Is-
      land under contract in force, by dredging and
      rock removal. Amount to be expended to com-
       plete_   ---------------------------------    $219, 273. 00
    Complete by Nov. 11, 1934, the widening of Shell
      Reef, Main Channel, under contract in force by
      dredging and rock removal. Amount to be ex-
                          --
      pended to complete-_____    _-- ____------505,       785. 00
    Complete by Dec. 4, 1934, the widening of Shell
      Reef 25-foot channel under contract in force,
      by dredging and rock removal. Amount to be
                           --
      expended to complete____    ___------_----       48, 186. 00
    Complete by Aug. 31, 1934, dredging and rock re-
      moval in Diamond Reef Channel and in area
      north of the New York Connecting R. R.
      bridge under contract in force. Amount to be
       expended to complete-------------------        124, 819. 00
    Complete by May 31, 1935, removal of Counties
      Reef to 40 feet under contract to be entered
      into. Amount to be expended to complete___ 260, 000. 00
    Operate the U. S. derrick boat E. R. 101 in the
      removal of isolated shoals (Sept 1934--Feb.
      1935     -----------------------------------     30,447. 96
    Surveys in connection with removal of isolated
       shoals -------------------------------             7, 000. 00
                                                                       1, 195, 510. 96
        Total-----       - -    --- --------------------- 1, 230, 123. 87
150          REPORT OF CHIEF OF ENGINEERS, U.                                      S. ARMY,             1934

   It is expected that the above work will complete the existing
project. Additional funds will be necessary for maintenance dredg-
ing. The sum of $25,000 can be profitably expended during the fiscal
year ended June 30, 1936, in the removal of isolated shoals which
have formed in the channel throughout the project by the use of the
U. S. derrick boat E. R. 101 and attendant plant.
                                      Cost and financial sunlmary
                                MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934--------------------------                                            $28, 2:58, 115. 36
Cost of maintenance to June 30, 1934 ---    __--_______ -                                          -      2324, 508. 47
      Total cost of permanent work to June 30. 1934 __- _____                                           28, 582, 624. 33
Value of plant, materials, etc., on hand June 30, 1934_________                                             869, 713. 22

      Net total cost to June 30, 1934_______________________                                            29, 452, 337. 55
Plus accounts receivable June 30, 1934______________________                                                 13, 031. 02

          Gross total costs to June 30, 1934_____________________                                       29, 465, 368. 57
Minus accounts payable June 30, 1934______________________                                                      63, 760. 25

     Net total expenditures__________________________                                                   29, 401, 608. 32
Unexpended balance June 30, 1934 _________________________                                                  137, 331. 40
          Total amount appropriated to June 30, 1934 _____-____                                         29, 538, 939. 72

    Fiscal year ending June 30              1930              1931             1932              1933              1934


Cost of new work __........           $1, 480, 195. 56 $1, 122, 674. 68    $769, 525. 81     $754, 488. 70       $543, 439. 21
Cost of maintenance- -------      _         6, 652. 76       3, 132. 20        6, 989. 94      34, 425. 85          5, 850. 54
       Total cost--------------        1, 486, 848. 32   1, 125, 806. 88    776, 515. 75      788, 914. 55        549, 289. 75
Total expended1--------------           , 513, 032. 96   1, 201, 694. 01    843, 338. 82      726, 440. 39        665, 866. 64
Allotted ----------...-.                 406, 450. 00    1, 071, 800. 00    424, 135. 42    1, 086, 308. 67       129, 226. 18



Balance unexpended July 1, 1933_____________________                                                          $673, 971. 36
Amount allotted from War Department Appropriation
Act approved April 15, 1926____________________ $87, 385. 40
Amount allotted from War Department Appropriation
Act approved July 14, 1932___ _______________-40,400.00
Amount allotted from War Department Appropriation
Act approved March 4, 1933___________-___ ____-33, 000. 00
                                                                                                               160, 785. 40

     Amount to be accounted for__ ____--___-_____-_______-                                              -834,       757. 26
Deductions on account of revocation of allotment____ ___31,                                                         559. 22

      Net amount to be accounted for______   _________----
                                                     -     -    -                                              803, 198. 04
Gross amount expended___________________________     778, 700. 80
Less reimbursements collected ____________---__      112, 834. 16
                                                                                                               665, 866. 64

          Balance unexpended June 30, 1934_ .....                          ______--___--                       137, 331. 40

   'After
   2
           adding
     After adding
                           $469,097.69 to adjust amount reported in Annual Report of 1933.
                           $176.62 to adjust amount reported in Annual Report of 1933.
            RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT                                                              151
Outstanding liabilities June 30, 1934 -----                                                 $11, 969. 60
Amount covered by uncompleted contracts                                  -----.-.-          108, 171. 42
                                                                                                                 $120, 141. 02

      Balance available June 30, 1934-.. __________--_____ -__-17,                                                      190. 38
Accounts receivable June 30, 1934____________________________                                                       13, 031. 02

     Unobligated balance available June 30, 1934 ______________                                                     30, 221. 40
Amount that can be profitably expended in fiscal year ending June
    30, 1936, for maintenance 1__                              ___________                                          25, 000. 00

                                                    PUBLIC WORKS           FUNDS

Cost of new work to June 30, 1934_____________________________                                                     520, 489. 04
Cost of maintenance to June 30, 1934      ____________________

      Total cost of permanent work to June 30, 1934_____.__                                                        520, 489. 01
Minus accounts payable June 30, 1934 _________________________                                                      34, 612. 91

     Net total expenditures_______------------_                                                                    485, 876.13
Unexpended balance June 30, 1934______----------                                                                   970, 123. 87

           Total amount appropriated to June 30, 1934______________1, 456, 000.00

       Fiscal year ending June 30                   1930            1931             1932               1933             1934


Cost of new work__--------------                             --------------------------                  -------     $520, 489. 04
Cost of maintenance---               ---         ------------------------- -------------------------------
Total expended_ _..............------------------------------___    _.                                                485, 876. 13

Allotted- ..            -...                                                                  -------------
                                                                                                        -     1----------------------------
                                                                                                            i1,  456, 000. 00


Amount allotted from National Industrial Recovery Act ap-
  proved June 16, 1933----------------------------------                                                       $1,456, 000. 00
Gross amount expended ______________________-$486, 278.11
Less reimbursements collected -------------            401. 98
                                                                                                    -              485, 876. 13

      Balance unexpended June 30, 1934 ____________-----970, 123. 87
Outstanding liabilities June 30, 1934____________ 3, 307. 96
Amount covered by uncompleted contracts-------- 929, 368. 54
                                                             932, 676. 50

    Balance available June 30, 1934                         37, 447. 37
Amount allotted by Public Works Administration, Emergency
Appropriation Act, fiscal year 1935__________  __________260, 000. 00
    Balance available for fiscal year 1935____________--   297, 447. 37

            CONSOLIDATED             COST AND FINANCIAL SUMMARY FOR EAST RIVER,                                  N. Y.

Cost of new work to June 30, 1934_________________________          $28, 778, 604. 90
Cost of maintenance to June 30, 1934_ .-.. ___-__-____           -___-324, 508. 47
       Total cost of permanent work to June 30, 1934---------- 29, 103, 113. 37
Value of plant, materials, etc., on hand June 30, 1934                   869, 713. 22  ----------
       Net total cost to June 30, 1934__                             29, 972, 826. 59
Plus accounts receivable June 30, 1934______ ________,_       ___         13, 031. 02
       Gross total costs to June 30, 1934___________________         29, 985, 857. 61
Minus accounts payable June 30, 1934 _______________-_____        -       98, 373. 16
       Net total expenditures -------------------------------        29, 887, 484. 45
Unexpended balance June 30, 1934----------------------- ____1.           107. 455. 27
       Total amount appropriated to June 30, 1934---------           30, 994, 939. 72
   1 EZxclusive of available funds.
   2   After adding $469,097.69 to adjust amount reported in Annual Report of 1933.
   8After adding $176.62 to adjust amount reported in Annual Report of 1933.
152          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934


  Fiscal year ending June 30                  1930              1931              1932              1933              1934


Cost of new work_---........          . $1, 480, 195. 56 $1, 122, 674. 68      $769, 525. 81   $754, 488. 70      $1, Q63,928. 25
Cost of maintenance_------..          ._      6, 652. 76       3, 132. 20         6, 989. 94     34, 425. 85            5, 850. 54
      Total cost--------------           1, 486, 848. 32   1, 125, 806. 88      776, 515. 75     788, 914. 55      1, 069, 778. 79
Total expended......--------------.      1, 513, 032. 96   1,201, 694. 01       843, 338. 82     726, 440. 39      1, 151, 742. 77
Allotted    ---------------------
                __                          408, 450. 00   1, 071, 800. 00      424, 135. 42   1, 086, 308. 67     1, 585, 226. 18



Balance unexpended July 1, 1933___________________________                                                     $673, 971. 86
Amount allotted from War Department Appropria-
tion Act approved Apr. 15, 1926_______
                                  ---           __ $87, 385. 40
Amount allotted from War Department Appropria-
tion Act approved July 14, 1932_________________   40, 400. 00
Amount allotted from War Department Appropria-
   tion Act approved Mar. 4, 1933                          ____________                   33, 000. 00
Amount allotted from National Industrial Recovery
Act approved June 16, 1933____________----       1, 456, 000. 00,
                                                                                                            1, 616, 785. 40

     Amount to be accounted for ____________________-____ 2,290, 757. 26
Deductions on account of revocation of allotment_______      31, 559. 22

      Net amount to be accounted for__________________--____ 2, 259, 198. 04
Gross amount expended_______-------------        1, 264, 978.91
Less reimbursements collected ______----------      113, 236. 14
                                                                 1, 151, 742. 77

      Balance unexpended June 30, 1934 ____________-------          1, 107, 455. 27
Outstanding liabilities June 30, 1934 --- _____ --      15, 277. 56
Amount covered by uncompleted contracts-------- 1, 037, 539. 96
                                                                    1, 052, 817. 52

      Balance available June 30, 1934_ -----------------------                                                    54, 637. 75
Accounts receivable June 30, 1934_ __ _________-------------                                                      13, 031. 02

     Unobligated balance available June 30, 1934 ___-- ____--
                                                            -67,                                                       668. 77
Amount allotted by Public Works Administration Emergency
Appropriation Act, fiscal year 1935______ ____--------------                                                    260, 000. 00

           Balance available for fiscal year 1935____________--                                                  327, 668. 77

Amount that can be profitably expended in fiscal year ending
   June 30, 1936, for maintenance 1-___ ____                                 ______----------                     25, 000. 00

                                      20. NEWTOWN CREEK, N. Y.

   Location.-This creek is a tidal arm of East River, N. Y., and
forms a part of the boundary between the boroughs of Brooklyn
and Queens, New York City. (See U. S. Coast and Geodetic Survey
Chart No. 745.)
   Previous projects.-Adopted by acts of June 14, 1880, July 5,
1884, and June 3, 1896. The total cost and expenditures were $527,-
530.58. The cost of new work and maintenance cannot be separately
stated with accuracy, the division in the early years being indeter-
minable; an approximate estimate is, that $401,260.51 was for new
work and $126,270.07 was for maintenance. For further details see
page 1769 of Annual Report for 1915.
    SExclusive of available funds.
      RIVERS AND HARBORS-FIRST      NEW YORK, N. Y.) DISTRICT     153

   Existing project.-This provides for a channel 23 feet deep and
130 feet wide from the East River to a point about 150 feet north of
Maspeth Avenue; for a turning basin in the vicinity of Mussel
Island; for dredging a triangular area lying on the north side of
the entrance to the creek; for a. channel 20 feet deep at mean low
water elsewhere in Newtown Creek, including Dutch Kills, Maspeth
Creek, and English Kills, and of the following widths: 150 feet wide
from Maspeth Avenue to Grand Street Bridge; 125 feet wide
from Grand Street Bridge to Metropolitan Avenue on the East
Branch, including the removal of Mussel Island; 150 feet wide in
English Kills, or West Branch, to the Metropolitan Avenue Bridge
across said branch, including the easing of bends; 100 feet wide for
a distance of 2,000 feet up Maspeth Creek; and 75 to 100 feet wide
for a distance of 2,800 feet up Dutch Kills, with a turning basin at
the head. The total length of channel included in the project is
about 25,000 feet. Mean tidal range, 4.2 feet; mean range of spring
tides, 5 feet; irregular fluctuations due to wind and barometric pres-
sure vary from about 3.5 feet below mean low water up to about 4
feet above mean high water.
   The estimate of cost for new work, revised in 1930, is $1,151,500,
exclusive of amounts expended on previous projects. The latest
 (1930) approved estimate for annual cost of maintenance is $20,000.
   The existing project was adopted by the following river and har-
bor acts: The act of March 2, 1919 (H. Doe. No. 936, 64th Cong., 1st
sess.), provided for depth of 20 feet; and July 3, 1930 (Rivers and
Harbors Committee Doc. No. 42, 71st Cong., 2d sess.), provided for
the 23-foot channel. A modification of harbor lines in the vicinity
of Mussel Island was approved by the Secretary of War January 21,
1920, and a concordant minor modification of the project without
change in the estimate of cost was approved by authority of the
Secretary of War March 22, 1920. The latest published maps are
in the project documents.
   Local cooperation.-The River and Harbor Act of March 2, 1919,
requires that all land needed for right-of-way be furnished without
cost to the United States, and provides that no work shall be done
in Maspeth Creek, in the removal of Mussel Island, or in English
Kills, until this has been done in each case and corresponding
changes made in existing harbor lines; also that no work shall be
undertaken under the existing project in Dutch Kills until the ob-
structive bridges near its mouth have been suitably modified.
   The lands needed in Maspeth Creek, Mussel Island, and the East
Branch have been ceded to the United States by the city of New
York by deed. No action has been taken by the city authorities
leading to the cession of land needed for right-of-way in English
Kills or West Branch. The work of modifying the bridges near
the mouth of Dutch Kills was completed in 1923. Local interests
at various times dredged for maintenance in front of their wharves.
They have also expended large sums in extending the channel in
the West Branch from the Metropolitan Avenue Bridge southward,
a distance of about 2,500 feet, to the present head of navigation
at Johnson Avenue. This extension is about 160 feet wide and 6 to
12 feet deep at mean low water. Extensive bulkheading, dredging,
and filling has also been done in the Dutch Kills Branch by private
interests.
154    REPORT OF CHIEF OF ENGINEERS,           U.   S.   ARMY,   1934


   Terminal facilities.-The length of water front measured along
both sides of the projected improvement is 11.6 miles, of which 9.6
miles are bulkheaded and about 13/4 miles of frontage, distributed
over the entire length of this waterway, is yet undeveloped. The
total available dockage is 51,420 feet, which is adequate for present
needs. (For latest full description of terminal facilities see Port
Series No. 20, Corps of Engineers.)
    Operations and results during fiscal year.-None. The experdi-
tures were $3,833.09 for the payment of accounts payable at th
beginning of the fiscal year.
    Condition at end of fiscal year.-The existing project is about 67
percent completed. The work of deepening the main channel to 23
feet and 130 feet wide from the entrance to 150 feet north of Maspeth
Avenue, including the triangular area at the entrance, and a turning
basin at the former location of Mussel Island is about 90 percent
completed. Dutch Kills has been dredged to project depth (20 feet)
for a width of 75 to 100 feet, except at a few places near the head of
improvement where unstable bulkheads restricted dredging opera-
tions. Maspeth Creek has been dredged to project dimensions
throughout. The controlling mean low-water depth in Newtown
Creek, main channel, is 23 feet from the entrance to 150 feet above
Maspeth Avenue, of the following widths: From the entrance to
Greenpoint Avenue 130 feet; thence to Meeker Avenue varying from
80 to 130 feet; thence to 150 feet north of Maspeth Avenue, 50 to 130
feet, including the full width of the turning basin at the former lo-
cation of Mussel Island, where it is 23 feet deep except for a few
scattered shoals. Examinations were made in Newtown Creek, main
channel, in 1932 and from March to May 1933. In Dutch Kills the
controlling depth was about 16 feet when examined in December
1931. In Maspeth Creek it was 19 feet when examined in August
1932. As shown by soundings taken in 1929 and 1933 the controlling
depth was 13 feet between Maspeth Avenue and Grand Street; and
12 feet to Metropolitan Avenue on the East Branch; in English
Kills on the West Branch, up to Metropolitan Avenue Bridge it was
about 12 feet. The work remaining to be done consists in complet-
ing to project dimensions the channel between Greenpoint Avenue
and Meeker Avenue; and from 800 feet north of Maspeth Avenue
up to Metropolitan Avenue on the East Branch; and English Kills
or West Branch up to the Metropolitan Avenue Bridge.
    The total cost of the existing project up to June 30, 1934, was
 $863.928.63-$767,093.96 for new work and $96,834.67 for mainte-
nance. The total expenditures were $863,522.49.
    Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $20,058.27, will be applied as follows:
Accounts payable June 30, 1934---------------------------------- $406.14
Maintenance: Remove by contract to be entered into shoals which
  have formed in the 23-foot channel from the mouth to Maspeth
  Avenue (October to November 1934) --------------------------- 19, 652. 13

      Total --------------------------------------------------          20, 058. 27
  The proposed work will partially restore the 23-foot channel to
project depth.
  Additional dredging for improvement is not considered necessary
for the present time in the East Branch. Work in English Kills
         RIVERS AND HARBORS-FIRST NEW YORK, N. Y.1 DISTRICT                                                          155
is deferred on account of conditions of local cooperation.                                                     It is be-
lieved that further maintenance work will be necessary during the
fiscal year 1936. Therefore, the sum of $20,000 can be profitably ex-
pended under contract during that year in maintaining the 23-foot
channel to project depth.
                                  Cost and financial summary
Cost of new work to June 30, 1934                             --------------                     -    $1, 168, 354. 47
Cost of maintenance to June 30, 1934_                                                                     223, 104. 74
     Total cost of permanent work to June 30, 1934----------    1, 391, 459. 21
Minus accounts payable June 30, 1934___------------------------         406. 14
     Net total expenditures----                                                                          1-------------------------,
                                                                                                           391, 053. 07
Unexpended balance June 30, 1934---------------------------                                                  20, 058. 27
        Total amount appropriated to June 30, 1934-------------1, 411, 111. 34

        Fiscal year ending June 30                    1930           1931           1932             1933          1934


Cost of new work _________________         _       $13, 043. 40 $179, 331. 95 $144, 541. 70 $149, 926. 69
Cost of maintenance_---- ___-----__-      __-_            3. 00          .17
     Total cost -----------.-------       -         13, 046. 40   179, 332. 12   144, 541. 70   149, 926. 69
Total expended_______________________               12, 988. 19   131, 542. 53 175, 265. 80     163, 300. 56      $3, 833. 09
Allotted _________     ________________        _   94, 800.00     130, 000. 00    89, 100. 00   142, 799. 65      17, 795. 23


Balance unexpended July 1, 1933-------------------------------                                                 $6,096. 13
Amount allotted from War Department Act approved April 26, 1934_                                               18, 800. 00
      Amount to be accounted for---------------------------24,      896. 13
Deductions on account of revocation of allotment---------------- 1, 004. 77
      Net amount to be accounted for    --------------------                                                   23, 891. 36
Gross amount expended      -------------------------- $4,178.19
Less reimbursements collected ----------------------- 345. 10
                                                                                                                3, 833. 09
      Balance unexpended June 30, 1934----------------------20, 058. 27
Outstanding liabilities June 30, 1934--------------------------- 406.14

        Balance available June 30, 1934-----------------------19, 652. 13

Amount. (estimated) required to be appropriated for completion of
   existing project 2-----------------                                                                      384, 400. 00

Amount that can be profitably expended in fiscal year ending June
   30, 1936, for maintenance           2-"_-__         ----                                           __       20, 000. 00

                                  21. HARLEM RIVER, N. Y.

  Location.-Harlem River and Spuyten Duyvil Creek, both in-
cluded in the project for the improvement of Harlem River, are two
tidal waterways, of a joint length of about 8 miles, lying wholly
within the limits of greater New York and separating Manhattan
Island from the mainland. (See U. S. Coast and Geodetic Survey
Chart No. 274.)
   Previous projects.-Adopted by the River and Harbor Act of June
23, 1874. Total cost and expenditure was $21,000, all for new work.
For further details see Annual Report for 1915, page 1762.
   1 After adding $406.15 to adjust amount reported in 1933 Annual Report.
   2 Exclusive of available funds.
 156    REPORT OF    CHIEF OF ENGINEERS,     U.   S.   ARMY,   1934

    Existing project.-This provides for a continuous channel 15 feet
  deep at nmean low water and 400 feet wide from East River to Hud-
  son River, except in the vicinity of Washington Bridge, where the
  adopted width is 354 feet, and at the rock cut throuigh Dyckmans
  Meadow, where it is 350 feet and the depth 18 feet. It also provides
  for straightening the channel at Johnson Iron Works by making a
  cut 15 feet deep and 400 feet wide. The length of channel included
  in the project is about 8 miles. The mean tidal range varies, accord-
  ing to locality, from 4.9 feet at Willis Avenue Bridge to 3.7 feet at
  Spuyten Duyvil Bridge; range of spring tides, 5.9 and 4.5 feet,
  respectively. Irregular fluctuations due to wind and barometric
  pressure vary from 3 feet below mean low water up to 4 feet above
  mean high water at Willis Avenue Bridge and from 3.5 feet below
  mean low water up to 3.5 feet above mean high water at Spuyten
  Duyvil Bridge.
    The estimate of cost for new work, revised in 1928, is $5,470,000,
  exclusive of amounts expended on previous projects. The latest
  (1928) approved estimate for annual cost of maintenance is $25,000.
    The existing project was adopted by the River and Harbor Act of
June 18, 1878. (H. Doc. No. 75, pt. 9, 43d Cong., 2d sess.) It was
modified in 1886 (Annual Report for 1886, p. 674) and 1893 (An-
nual Report for 1912, p. 198), and enlarged by the River and Harbor
Act of March 4, 1913 (H. Doc. No. 557, 62d Cong., 2d sess.). For
latest published maps see Annual Report for 1913', p.age 1644, and
the last-mentioned document.
    Local cooperation.-The River and Harbor Act of June 18, 1878,
adopting the existing project, and the River and Harbor Act of
March 3, 1879, provided that the necessary right-of-way should be
provided free of cost to the United States before work was begun.
This provision was complied with by the State of New York, which
procured the necessary lands and completed their transfer to the
United States in May 1887. A similar provision is contained in the
River and Harbor Act of March 4, 1913, authorizing the straighten-
ing of the channel at Johnson Iron Works. The River and Harbor
Act of March 4, 1915, provides for the cession to the State of the
land occupied by the present channel at that point, after the right-
of-way for the cut-off has been provided and the new channel com-
pleted. Under the provisions of acts of the New York State Legis-
lature approved April 1, 1922, and May 1, 1933, by the Governor of
the State of New York (chs. 407 and 624 of the laws of New York,
respectively) the State of New York has ceded to the United States
by deed all lands needed for rights-of-way.
   Terminal facilities.-The direct length of water front measured
along both shores of the Harlem River is about 16 miles; of this
length topographical features render 4 miles unavailable for com-
mercial use. About 5 miles in length of water front have been de-
veloped by the construction of 125 piers, wharves, and bulkheads,
with a total available dockage of 38,522 feet, of which 22,728 feet are
owned by the city of New York and 685 feet are owned by the State
of New York, the latter as a barge canal terminal. Of the terminals
owned by the city some are open to the public on equal terms, some
are leased for commercial use and a few are used by city departments.
         RIVERS AND HARBORS-FIRST                               NEW YORK, N.                 Y., DISTRICT                  157

   Ten terminals have railroad connections, 7 of which are owned by
the railroads, 1 by a private corporation, and 2 by the city of New
York. (For latest full description of terminal facilities see Port
Series No. 20, Corps of Engineers.)
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.--The project is about 50 percent
completed. A channel 15 feet deep at mean low water and 400 feet
wide has been excavated from the East River up to High Bridge.
From High Bridge to the Hudson River a channel 15 feet deep and
350 feet wide has been excavated. The controlling depth from the
East River to the Hudson River is about 15 feet at mean low water
through a navigable channel varying from 100 to 350 feet in width.
The widths of channel through bridge draws are 98 to 100 feet.
   The work remaining to be done to complete the project consists in
widening the dredged channel above High Bridge and straightening
the channel at the Johnson Iron Works.
   The total cost of the existing project up to June 30, 1934, was
$2,865,042.51-$2,688,054.19 for new work and $176,988.32 for main-
tenance. The total expenditures amounted to $2,865,042.51.
   Proposed operations.-There are no funds available and no work
is proposed during the fiscal years 1935 and 1936.
                                      Cost and financial summary

Cost of new work to June 30, 1934-------------------------$2, 709, 054.19
(Cost of maintenance to June 30, 1934-------------------------- 176, 988. 32
      Total cost of permanent work to June 30, 1934------------                                         2, 886, 042. 51
Net total expenditures__              -----------------------                                           2, 886, 042. 51
Total amount appropriated to June 30, 1934--------------------                                          2, 886, 042. 51

        Fiscal year ending June 30                      1930           1931           1932          1933              1934


Cost of new work __       -           _             $150, 082. 36   $20, 126. 37 $135, 025. 85      $926. 71
Cost of maintenance   ----------      ---              2, 151. 52    27, 970. 17    8, 026. 02     5, 375. 37
      Total cost-_----------- ---              __    152, 233. 88    48, 096. 54   143, 051. 87    6, 302. 08          --.........

Total expended___---- --------              ____     206, 887. 03    43, 129. 07   134, 843. 91   20, 084. 031        -$
                                                                                                                 -......


Allotted .......      ........     ....... - .. -9, 000. 00          80, 000. 00    11, 740. 00    -292. 18          -$441. 49


Balance unexpended July 1, 1933--------------------------------    $441.49
Deductions on account of revocation of allotment----------------    441. 49
Amount (estimated) required to be appropriated for completion of
  existing project------------------------------------------2, 782, 000. 00

              22. HUDSON RIVER CHANNEL, NEW YORK HARBOR

  Location.-Hudson River empties into the upper bay of New York
Harbor at the Battery, New York City. The section included under
this title extends from a line joining the Battery and Ellis Island
to the northern limits of New York City, a distance of about 16
miles. (See U. S. Coast and Geodetic Survey Charts Nos. 274, 745,
and 746.)
   Previous projects.-Adopted by acts of March 3, 1875, June 6,
1900, March 3, 1905, and March 4, 1913. The total costs and ex-
penditures were $69,629.12, all for new work. For further details
see Annual Report for 1915, page 1765.
158     REPORT   OF   CHIEF OF ENGINEERS,    U.   S.   ARMY,   1934

   Existing project.-This provides for a channel 40 feet deep from
pierhead line to pierhead line from Twentieth Street, Manhattan, to
a point 1,300 feet below Newark Street, Hoboken, thence 2,800 feet
wide to the Battery and beyond to deep water off Ellis Island; a
channel 30 feet deep in the area between the 40-foot channel and
the Jersey City water front, substantially as shown on map in House
Document No. 450, Seventieth Congress, second session; a channel
750 feet wide and 30 feet deep along the Weehawken-Edgewater
water front; the removal of a shoal on the New York side between
West Nineteenth and West Sixty-first Streets to a depth of 40 feet;
and the removal of an obstruction north of the mouth of Spuyten
Duyvil Creek to the depth of the surrounding river bottom. The
length of the section included in the project is about 16 miles. Mean
tidal range at the Battery, 4.4 feet, and at the mouth of Spuyten
Duyvil Creek, 3.7 feet; mean range of spring tides 5.3 feet and 4.5
feet, respectively; irregular fluctuations due to wind and barometric
pressure vary from 4 feet below mean low water at the Battery up to
4 feet above mean high water, and at the mouth of Spuyten Duyvil
Creek from 3.5 feet below mean low water up to 3.5 feet above mean
high water.
   The estimate of cost for new work, revised in 1930, is $4,690,000,
exclusive of the amounts expended on previous projects. The latest
 (1930) approved estimate for annual cost of maintenance is
$114,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 4, 1913, provided for the 30-foot
channel from Ellis Island to Newark Street, a depth of 40 feet
through shoal off Hamburg Avenue, a channel 26 feet deep and 550
feet wide along Weehawken-Edgewater water front; removal of
shoal on east side of river between West Nineteenth and West
Thirty-second Streets, removal of rock near the Battery and an
obstruction near Spuyten Duyvil Creek (H. Doc. No. 719, 62d Cong.,
2d sess.); the act of March 4, 1915, authorized additional dredging
in the vicinity of the shoal off Hamburg Avenue (A. R. 1914, pp.
234-235); the act of August 8, 1917, provided for the removal of
a shoal between West Thirty-second and West Sixty-first Street to
a depth of 40 feet and widening the 40-foot channel between the
Battery and Canal Street to 2,000 feet (H. Doc. No. 1697, 64th
Cong., 2d sess.); the act approved March 3, 1925, provided for in-
creasing the depth of the channel along the Weehawken-Edgewater
water front to 30 feet at mean low water and the width to 750 feet
 (H. Doc. No. 313, 68th Cong., 1st sess.) ; the act of January 21, 1927,
modified the conditions of local cooperation stated in House Docu-
ment No. 313, Sixty-eighth Congress, first session, and the act of
July 3, 1930, provided for increasing the width of the 40-foot chan-
nel between Twentieth Street, Manhattan, and Ellis Island, and for
a 30-foot channel between the west channel line of the 40-foot chan-
nel and the channel along Jersey City water front (H. Doc. No.
450, 70th Cong., 2d sess.). For latest published maps see Annual
Report for 1915, page 2144, House Document No. 1697, Sixty-fourth
Congress, second session, House Document No. 450, Seventieth Con-
gress, second session, and House Document No. 309, Seventy-second
Congress, first session.
        RIVERS AND HARBORS-FIRST        NEW YORK, N. Y., DISTRICT   159

   Supplementing the work authorized by Congress, the widening
of the 40-foot channel to full width of the river from the north line
of Fifty-ninth Street to the south side of Little Basin, and thence a
channel of the same depth to deep water in Upper New York Bay
off Ellis Island, at an estimated cost of $865,000, with maintenance
estimated at $30,000 annually in addition to that now required, all
as recommended by the Chief of Engineers in House Document
No. 309, Seventy-second Congress, first session, was included in the
public-works program under the National Industrial Recovery Act.
   Recommended modifications of project.-Included in Public Works
program. Under date of October 10, 1932, the Chief of Engineers
recommended that all conditions of local cooperation with respect to
the project for the Hudson River Channel at Weehawken and Edge-
water, N. J., be waived. (Rivers and Harbors Committee Doc. No.
49, 72d Cong., 2d sess.)
   Local cooperation.-There are legal questions concerning the ex-
tent of local cooperation required in connection with the channel
along the Weehawken Edgewater water front which remain to be
determined.
   Terminal facilities.-The direct length of water front included in
the project for improvement, measured along both shores of the
river, is 32 miles; of this length, 7 miles of the Manhattan water
front and 10 miles of the New Jersey water front have been devel-
oped for commercial use by the construction of terminals consisting
of piers, bulkheads, warehouses equipped with modern appliances for
handling freight, modern coal piers, bridges for the transfer of cars
to and from floats, marine railways, drydocks, and ferry racks.
   The total available dockage along the Manhattan water front in
use for commercial purposes is 163,600 linear feet and along the New
Jersey water front about 213,800 linear feet.
   Most of the terminals are efficient in respect to the method of
freight handling. The methods in use vary from the most modern
freight-handling appliances to hand trucks. The appliance installed
is generally that believed to be the best adapted for use in transfer-
ring the particular class of freight to be handled. Many terminals
have direct railroad connection.
   The New York City authorities are constantly adding to and im-
proving the terminals along the Manhattan water front, and private
and corporate interests have in view the construction of additional
terminals of large capacity along the New Jersey water front,
particularly in the stretch above Castle Point. (For latest full
description of terminal facilities see Port Series No. 20, Corps of
Engineers.)
                OPERATIONS   AND RESULTS DURING FISCAL YEAR

  Project adopted by Congress.-The U. S. derrick boat E. R. 101
was employed during July 1933 in reducing isolated shoals of mud
and silt to 40 feet in the main (2,800-foot) channel from Ellis Island
to West Twentieth Street, Manhattan, at a cost of $5,152.90 for new
work.
  The U. S. sea-going dredges Raritan and Navesink were employed
in September 1933 and from May 14 to June 30, 1934, respectively,
        91536-ENG 1934-11
160     REPORT OF CHIEF OF ENGINEERS,       U.   S.   ARMY,   1934


'in dredging to 26 feet under the previous project, along the Wee-
hawken-Edgewater water front, removing a total of 333,609 cubic
yards, bin measurement, of mud and silt, at a cost of $70,772.77 for
maintenance.
    The cost of surveys and contingencies was $32.15-$4.53 for new
work and $27.62 for maintenance.
    The total cost was $75,957.82$5,157.43 for new work and $70,-
800.39 for maintenance. The expenditures were $91,303.07.
    Project authorized by the Federal Emergency Administration of
Public Woorks.-The U. S. sea-going dredge Navesinle was employed
from October 1 to November 26, 1933, January 1 to 7, 1934, and Feb-
ruary 15 to March 31, 1934, in widening the 40-foot main (2,800-foot)
channel from Ellis Island to West Twentieth Street, Manhattan, au-
thorized by act approved July 3, 1930, removing a total of 280,367
cubic yards, bin measurement, of mud and silt, at a cost of $67,693.37
for new work.
    The U. S. derrick boat E. R. 101 was employed from October 1 to
31, 1933, November 13 to 26, 1933, January 15 to February 5, 1934,
and March 8 to 21, 1934, in reducing shoals to 40 feet in the main
 (2,800-foot) channel, from Ellis Island to West Twentieth Street,
Manhattan, removing a total of 736 cubic yards, place measurement,
of mud and stones, at a cost of $14,390.48 for new work.
   The U. S. sea-going dredges Raritan, Navesinck, and Atlantic were
employed from November 1, 1933, to April 22, 1934, May 27 to 31,
June 1 to 5 and 15 to 24, 1934; November 16 to December 31, 1933;
April 1 to May 13, 1934; and December 16, 1933, to January 31, 1934,
respectively, in widening to provide a 40-foot channel between pier-
head lines Ellis Island to West Fifty-ninth Street, New York City,
as recommended by the Chief of Engineers in House Document No.
309, Seventy-second Congress, first session, removing a total of
1,103,539 cubic yards, bin measurement, of mud, sand, clay, and silt,
at a cost of $232,900.60 for new work.
   The total cost was $314,984.45 for new work, and the total expendi-
tures were $302,257.72, all from Public Works funds.
   The total cost, all funds, was $390,942.27-$320,141.88 for new work
and $70,800.39 for maintenance. The total expenditures were
$393,560.79.
    Condition at end of fiscal year.-About 74 percent of the existing
project has been completed. About 89 percent of the work of widen-
ing the main channel from Ellis Island to West Twentieth Street,
Manhattan, for the full width of 2,800 feet, has been completed. The
work done has resulted in removing the rock off Pier A to project
depth, in excavating the channel along the Jersey City water front,
in completing the removal of a shoal along the Hoboken water front
to project width and depth, in completing the Weehawken-Edge-
water water front to a depth of 26 feet and width of 550"feet, in com-
pleting the channel between the Battery and Canal Street to a depth
of 40 feet and width of 2,000 feet, and in completing the removal of
a shoal along the Manhattan water front between West Nineteenth
and West Sixty-first Streets to the project depth, except immediately
adjacent to the pierhead line from West Twenty-second Street to
West Thirty-third Street, where the depth varies from 18 feet along
      RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT          161

the pierhead line up to 40 feet at a distance of 150 feet out from the
pierhead line and in removing the obstruction north of the mouth of
Spuyten Duyvil Creek to the depth of the surrounding bottom.
   The controlling mean low-water depth through the channel along
the Jersey City water front, when examined in December 1933-Janu-
ary 1934, was 30 feet, except along the west channel line for a width
of about 100 feet between Morris Canal Basin and 1,300 feet below
Newark Street where shoals limit the depth to 27 feet.
   Along the Hoboken water front, when examined in June 1934, the
depth was 40 feet, except along the modified pierhead line, where it
was about 32 feet deep. A few isolated shoals exist in the area where
the least depth is 36 feet.
    The controlling mean low-water depth along the Weehawken-
Edgewater water front for a width of about 500 feet channelward
from the modified pierhead line when examined in March-June 1934
was 24 feet along the New Jersey side opposite West Sixtieth Street
to West One Hundred and Tenth Street, New York City; 21 feet to
opposite West One Hundred and Nineteenth Street; 18 feet to West
One Hundred and Thirty-fourth Street, thence to the northern en-
trance to opposite West One Hundred and Fifty-third Street, 22 feet
for a width of at least 550 feet.
    The controlling mean low-water depth in the main (adopted) chan-
nel from Ellis Island to 1,300 feet below Newark Street, Hoboken,
N. J., when examined in January to March and November to Decem-
ber 1933 and February to March 1934 was about 40 feet for a width
of 2,800 feet. Along the Manhattan water front, from West Nine-
teenth to West Sixty-first Street, when examined in January to
February 1933, the depth was 40 feet except for a shoal extending
along the modified pierhead line from West Twenty-second to West
Thirty-fourth Street. with a least depth about 32 feet, gradually
increasing to 40 feet and varying from 20 to 180 feet channelward
from the pierhead line. From West Forty-eighth to West Fifty-
fourth Street a shoal extended along the modified pierhead line hav-
ing a least depth of 30 feet, gradu:ally increasing to 40 feet at a
distance of about 35 feet channelward from the modified pierhead
line; from West Fifty-ninth to West Sixty-first Street along the
modified pierhead line the least depth was 27 feet, gradually increas-
ing to 40 feet at a distance of about 150 feet channelward from the
modified pierhead line; elsewhere along this water front the depth
was 40 feet. The work remaining to be done to complete the adopted
project consists in deepening and widening the channel along the
Weehawken-Edgewater water front as authorized by the River and
Harbor Act of March 3, 1925, and completing deepening and widen-
ing the channel as authorized by the River and Harbor Act of July
3, 1930, by the removal of a shoal along the pierhead line, New Jer-
sey side, from opposite Canal Street to West Twentieth Street, New
York City.
    With funds allotted by the Public Works Administration the
widening of the channel authorized in 1930 has been continued at a
cost of $82,083.85 for new work and an expenditure of $81,554.26,
and the further widening below West Fifty-ninth Street, Manhat-
tan, under the Public Works Administration project, has been com-
menced at a cost of $232,900.60 for new work and an expenditure of
162      REPORT OF     CHIEF OF ENGINEERS,         U.   S.   ARMY,   1934

 $220,703.46, and is about 36 percent completed. Under the latter
feature, widening remains to be done along the westerly side,
Ellis Island to opposite West Fifty-ninth Street, Manhattan. The
total cost was $314,984.45 for new work. The expenditures were
$302,257.72.
   The total cost of the existing project to June 30, 1934, with regular
funds, was $4,952,769.62-$3,432,840.87 for new work and $1,519,-
928.75 for maintenance. The total expenditures were $4,948,859.85.
   The total cost, all funds, to June 30, 1934, was $5,267,754.07-
$3,747,825.32 for new work and $1,519,928.75 for maintenance. The
total expenditures were $5,251,117.57.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $170,758.65, will be applied to the operation
of one United States sea-going dredge for about 8 months (July 1934
to February 1935) in the removal of shoals along the Manhattan
water front, and in the partial restoration of Weehawken-Edgewater
water-front channel to the depth authorized under the previous
project (26 feet at mean low water).
   The balance unexpended, including accounts receivable, at the end
of the fiscal year, together with an allotment of $165,000 from the
Emergency Appropriation Act of 1934 made during August 1934, a
total of $471,278.31, will be applied as follows:
Accounts payable June 30, 1934--------------------------------         $32, 623. 76
New work :
    Complete by May 31, 1935, under contract to be entered into, the
      removal of rock shoal off Jersey City water front within the
      limits of the 40-foot channel below West Fifty-ninth Street,
      recommended in H. Doc. No. 309, 72d Cong., 1st sess ._-_.__    438, 654. 55

         Total----------------------------------------------           471, 278. 31
   Work of improvement of Weehawken-Edgewater water front is
deferred pending action by Congress on the recommendation con-
tained in Rivers and Harbors Committee Document No. 49, Seventy-
second Congress, second session, that all conditions of local coopera-
tion be waived. The widening below West Twentieth Street author-
ized in 1930 and the further widening below West Fifty-ninth Street
should be carried to completion. Full project dimensions should be
maintained throughout the existing project channel where previously
completed and in the Weehawken-Edgewater water front. There-
fore the sum of $383,000 can be profitably expended during the fiscal
.year ending June 30, 1936, as follows:
New work:
    Operate 1 United States sea-going dredge 3 months in widening the
     40-foot channel authorized in 1930 below West Twentieth Street
     (July to September 1935) ----------------------------------         $60, 000
   'Operate U. S. derrick boat E. R. 101 and attendant plant in remov-
     ing isolated shoals to complete the widening of the 40-foot chan-
     nel below West Twentieth Street (October-December 1935) _--_         15, 000
    Operate 2 United States sea-going dredges in widening to provide a
     40-foot channel between pierhead lines, Ellis Island to West Fifty-
     ninth Street, New York City, as recommended in H. Doc. No. 309,
     72d Cong., 1st sess. (July 1935 to May 1936) ------------------ 181, 000
   Operate U. S. derrick boat E. R. 101 and attendant plant about 3
     months to complete the widening below West Fifty-ninth Street
      ,(April to June 1936) ------------     ------------------------     13, 000
                                                                            269, 000
            RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT                                                              163
Maintenance:
   Operate 1 United States sea-going dredge for about 6 months dur-
      ing the fiscal year ---------------------------------------- $114, 000

              Total---------------------------------------------------383,                                                   000

                                         Cost and financial summary

                                  MAINTENANCE            AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934---------------------------$3, 502, 469. 99
Cost of maintenance to June 30, 1934_--------------------__   1, 519, 928. 75

      Total cost of permanent work to June 30, 1934 ...... __                                                5, 022, 398. 74
Minus accounts payable June 30, 1934-------------------------                                                     3, 909. 77
           Net total expenditures---------------------------------5, 018, 488. 97
Unexpended balance June 30, 1934__________________________                                                       170, 758. 65

           Total amount appropriated to June 30, 1934 --------------                                         5, 189, 247. 62

            Fiscal year ending June 30                      1930          1931            1932            1933           1934


Cost of new work _ .__________   --       _        .                      $419. 88 $399, 145. 37 $152, 540. 35          $5, 157. 43
Cost of maintenance--- ------------------ $59, 481. 14                 136, 049. 31  34, 511. 84 107 510. 56            70, 800. 39
      Total cost......---------------------              59, 481. 14   136, 469. 19   433, 657. 21   260, 050. 91       75, 957. 82
Total expended--          _ _---_-_-_--- --.             44, 362. 37   155, 902. 76   386, 551. 53   289, 043. 43       91, 303. 07
Allotted        ......
               __.....    .....       .....         . 158, 000. 00     390, 000. 00    94, 000. 00   278, 896. 57      204, 863. 33



Balance unexpended July 1, 1933 __                                                                               $57, 198. 39
Amount allotted from War Department Appropria-
  tion Act approved Apr. 26, 1934---------______   $165, 000. 00
Amount allotted from War Department Appropria-
tion Act approved July 14, 1932------------------   45, 000. 00
                                                                                                                 210, 000. 00
      Amount to be accounted for__                                                                               267, 198. 39
Deductions on account of revocation of allotment________.______                                                    5, 136. 67
      Net amount to be accounted for _____         ____                                                          262, 061. 72
Gross amount expended _________________________         113, 190. 84
Less reimbursements collected__ _________________-
                                       -21,                  887. 77
                                                                                                                  91, 303. 07
                                                                                                                  S

      Balance unexpended June 30, 1934 ----------------------- 170, 758. 65
Outstanding liabilities June 30, 1934--------------------------- 3, 909. 77
           Balance available June 30, 1934--------------------                                       __          166, 848. 88
Amount (estimated) required to be appropriated for completion
of existing project 1_-------_---------- __-____________     1, 175, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1936 :
    For new work---------------------------------------                                                             75, 000. 00
     For maintenance 1                         ___----------------                                               114, 000. 00

           Total 1       ---             ----------------------------------                                      189, 000. 00

  1Exclusive of available funds.
164          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                     1934

                                                         PUBLIC WORKS FUNDS


Cost of new work to June 30, 1934__-____________ _____ _____ $314, 984. 45
Cost of maintenance to June 30, 1934____________________________                                            -----------
Total cost of permanent work to June 30, 1934__                                                                   314, 984. 45
Value of plant, materials, etc., on hand June 30, 1934--------.__.                                                  2, 734. 45
      Net total cost to June 30, 1934__________________________                                                   317, 718. 90
Plus accounts receivable June 30, 1934__________________________                                                   17, 162. 58
           Gross total costs to June 30, 1934---------------------__                                              334, 881.48
Minus accounts payable June 30, 1934_______________________                                                         32, 623.76

      Net total expenditures ------------------------------                                                       302, 257.72
Unexpended balance June 30, 1934      ._                                                                          289, 115.73
           Total amount appropriated to, June 30, 1934______________                                               591, 373. 45

           Fiscal year ending June 30                           1930             1931    1932             1933           1934


Cost of new work ---------                                   -----------                  --        ---               $314, 984. 45
Cost of maintenance....-                                                   ---          ----
Total expended____                                            _-_                                                     302, 257. 72
Allotted                   .--------------------------
             .__-----------__.------------_                                                                            591, 373. 45



Amount allotted from National Industry Recovery Act approved
June 16, 1933 _________________                                                                                 $700, 000. 00
Deductions on account of revocation of allotment__                                       ____      ___             108, 626.55

      Net amount to be accounted for________________________                                                       591, 373. 45
Gross amount expended-------------------------     $533, 691.82
Less reimbursements collected--------------------231,    434.10
                                                                                                                   302, 257. 72

           Balance unexpended June 30, 1934_____________________                                                   289, 115. 73
Outstanding liabilities June 30, 1934________________________                                                       32, 623.76

           Balance available June 30, 1934 ________________                                               -___ 256, 491.97
Accounts receivable June 30, 1934_____________________________                                                      17, 162. 58

     Unobligated balance available June 30, 1934                                                                   273, 654. 55
Amount allotted by Public Works Administration, Emergency Ap-
propriation Act, fiscal year 1935__-___________-__ __-_____-                                                      165, 000. 00

           Balance available for fiscal year 1935__-----------------                                               438, 654.55

Amount (estimated) required to be appropriated for completion
of Public Works Administration project 1____________________                                                      433, 000. 00

Amount that can be profitably expended
                                 -
                                       in fiscal year ending
June 30, 1936, for new work 1_____            ___                                                                 194, 000. 00

CONSOILIDATED            COST AND FINANCIAL SUMMARY                              FOR HUDSON     RIVER     OCHANNEL, N.          Y.

Cost of new work to June 30, 1934____________________--____                                                 $3, 817, 454.44
Cost of maintenance to June 30, 1934 _____________________                                                      1, 519, 928. 75

           Total cost of permanent work to June 30, 1934-----------                                              5, 337, 383.19

   1Exclusive        of available funds.
          RIVERS AND HARBORS---FIRST NEW YORK, N. Y., DISTRICT                                                               165
Value of plant, materials, etc., on hand June 30, 1934-----------                                                    $2, 734. 45

          Net total cost to June 30, 1934                          --------                             __ '5,340, 117. 64
Plus accounts receivable June 30, 1934                                                  --               _           17, 162. 58

     Gross total costs to June 30, 1934 ...                                   .              ----               5, 357, 280. 22
Minus accounts payable June 30, 1934-      -                                  -----                      _          36,533. 53

         Net total expenditures-_                                                                               5, 320, 746. 69
Unexpended balance June 30, 1934__                                                                                  459, 874. 38

         Total amount appropriated to June 30, 1934-                                   -            _           5,780, 621. 07

         Fiscal year ending June 30                    1930           1931              1932                 1933         1934


Cost of new work________                                             $419. 88 $399, 145. 37 $152, 540. 35              $320, 141. 88
Cost of maintenance___                             $59, 481. 14   136, 049. 31  34, 511. 84 107, 510. 56                 70, 800. 39

      Total cost__                                  59, 481. 14   136, 469. 19    433, 657. 21      260, 050. 91        390, 942. 27
Total expended__.....                               44, 362. 37   155, 902. 76    386, 551. 53      289, 043. 43        393, 560. 79

Allotted .---------------------------              158, 000. 00   390, 000. 00        94, 000. 00   278, 896. 57        796, 236. 78

Balance unexpended July 1, 1933_-------------------------------                                                     $57, 198. 39
Amount allotted from War Department Appropria-
  tion Act approved Apr. 26, 1934-----------------  $165, 000. 00
Amount allotted from War Department Appropria-
tion Act approved July 14, 1932------------------    45,000. 00
Amount allotted from National Industrial Recovery
Act approved June 16, 1933------------------_     1,400, 000. 00
                                                                                                                1, 610, 000. 00

     Amount to be accounted for-----------------------------1,                                                      667, 198. 39
Deductions on account of revocation of allotment---------------                                                     813, 763. 22

      Net amount to be accounted for---------------------------            853, 435. 17
Gross amount expended                                 6---------------------------46,
                                                            882. 66
Less reimbursements collected---------------------253,      321. 87
                                                                          393, 560. 79

      Balance unexpended June 30, 1934-----------------------                                                       459, 874. 38
Outstanding liabilities June 30, 1934---------------------------                                                     36, 533. 53

     Balance available June 30, 1934-------------------------_                                                      423, 340. 85
Accounts receivable June 30, 1934------------------------------                                                      17, 162. 58

     Unobligated balance available June 30, 1934--------------                                                      440, 503. 43
Amount allotted by Public Works Administration Emergency Ap-
propriation Act, fiscal year 1935------------------------------                                                    165, 000. 00
         Balance available for fiscal year 1935------------------_                                                  605, 503. 43
Amount (estimated) required to be appropriated for completion
of the improvement ----------------------------------------  1,608, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1936:
   For new work 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -               269, 000. 00
   For maintenance --------------------------------------                                                           114, 000. 00
         Total -                                 ------------------------------                                     383, 000. 00
   23. NEW YORK HARBOR--COLLECTION AND REMOVAL OF DRIFT

  Location.-This project applies to the Lower and Upper Bays,
New York Harbor; Jamaica Bay, Bay Ridge, and Red Hook Chan-
  1 Exclusive of available funds.
166     REPORT    OF CHIEF OF     ENGINEERS, U.      S. ARMY,    1934

nels, Gowanus Creek Channel, Buttermilk Channel, East River,
Newtown Creek, Harlem River, Hudson River Channel, N. Y.;
and Staten Island Sound and Newark Bay, N. J.
   Existing project.-This provides for the collection and removal of
drift from New York Harbor and its tributary waters, and author-
izes the Secretary of War to allot such amounts as may be necessary
for the work from appropriations for maintenance and improvement
of existing river and harbor works or other available appropriations,
and that this work hereafter shall be carried as a separate and dis-
tinct project. It is wholly a work of maintenance. The purpose of
the work is to afford relief from variable conditions of obstruction,
and no advance estimate of the amount of work required and its
proper cost can be made. The project adopted by the River and
Harbor Acts of March 4, 1915, and August 8, 1917, was modified
by the River and Harbor Act of July 3, 1930, which provides for the
method of allotting funds and for carrying this work as a separate
and distinct project.
   Terminal facilities.-Describedin the separate reports covered.
   Operations and results during fiseal year.-U. S. steam lighters
Manisees and Roccaway and U. S. tugs Astoria and Deland were
assigned to the work of removing and disposing of drift when not
employed on other work. There were removed and disposed of
during the year about 310,720 cubic feet (2,427 cords) of driftwood,
ranging in size from small blocks up to timber of large dimensions,
piles, pieces of wreckage, etc. The cost of this work was $57,369.62,
all for maintenance. The expenditures were $54,848.80.
   Condition at end of fiscal year.-The project is one of continuous
maintenance for which no percentage of completion exists. Naviga-
tion has been made safer by the removal of large quantities of drift
material. Since the beginning of operations, May 21, 1915, there
have been removed and disposed of, 5,538,553 cubic feet (43,270
cords) of drift material, at a total cost to June 30, 1934, of
$752,753.76. The total expenditures amounted to $747,900.68.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $53,051.20, will be applied as follows:
Accounts payable---------------------------------------------       $4, 853.08
Maintenance: Continue the work of drift-material removal by the
  use of United States lighters and gasoline tug (July 1934 to June
  30, 1935)                      ----------------------- ----       48, 198. 12

      Total --------------------------------------------------          53, 051. 20
   It is necessary for the safe navigation of vessels that the removal
of drift material be carried on regularly. Therefore, the additional
sum of $50,000 can be profitably expended on this work during the
fiscal year ending June 30, 1936, by the operation of 2 lighters and
1 gasoline tug throughout the fiscal year.
                         Cost and financial summary

Cost of maintenance to June 30, 1934__------------------------- $752, 753. 76
Minus accounts payable June 30, 1934---------------------------    4, 853. 08

     Net total expenditures_     _--------------------              747, 900. 68
Unexpended balance June 30, 1934____- ___---------------------       53, 051. 20
      Total amount appropriated to June 30, 1934-    -800,                 951. 88
          RIVERS AND HARBORS-FIRST                                    NEW YORK, N. Y., DISTRICT                             167

         Fiscal year ending June 30                        1930            1931           1932            1933           1934


Cost of new work -         -       -     -         -     -       -      -       -      -       -      -          -     -     -
Cost of maintenance       -- - -_______'-i------       $49, 805. 41    $70, 234. 01   $49, 114. 19    $35, 935. 98     $57, 369. 62
Total expended--------------------------                44, 962. 48     69, 620. 26    54, 139. 25     36, 689. 45      54, 848. 80
Allotted------   --   ..--------       _ _-        -    53, 600. 00    117, 000. 00     5, 000. 00     32, 990. 44     101, 933. 41



Balance unexpended July 1, 1933_                                                            __          --_          $5, 966. 59
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934-__                                                                      $43, 000
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933 -------------------------                                                  75, 000
                                                                                                                 118, 000. 00

      Amount to be accounted for__                                                                               123,966. 59
Deductions on account of revocation of allotment--------------                                                    16, 066. 59

      Net amount to be accounted for-------------------------107,                                                       900. 00
Gross amount expended __       ____-...-_,____        54, 858. 28
Less reimbursements collected_                              9. 48
                                                                                                                     54, 848. 80
      Balance unexpended June 30, 1934------------------------     53, 051. 20
Outstanding liabilities June 30, 1934-----------------------------  4, 853. 08

         Balance available June 30, 19834 ______________------_48,                                                      198. 12

Amount that can be profitably expended in fiscal year ending
June 30, 1936, for maintenance ____________________________                                                         50, 000. 00

                                   24. TARRYTOWN HARBOR, N. Y.

   Location and description.-This harbor extends along the east
shore of Hudson River for a distance of about 1 mile below Kings-
land Point, 29 miles above the Battery, New York City. The dis-
tance to the 12-foot contour in the river from the pierheads varies
between 1,600 feet and 2,200 feet. (See U. S. Coast and Geodetic
Survey Chart No. 281.)
   Existing project.-This provides for a channel along the wharf
front of the harbor 12 feet deep at mean low water and 150 feet
wide, and northerly and southerly connections with deep water in
Hudson River of the same depth and 100 feet wide; total length,
about 5,700 feet. Mean tidal range, 3.1 feet; mean range of spring
tides, 3.8 feet; extreme range due to wind and barometric pressure,
8.2 feet; irregular fluctuations are infrequent and do not materially
affect navigation. The estimate of cost for new work, revised in
1926, was $56,000. The latest (1928) approved estimate for annual
cost of maintenance is $4,000.
   The existing project was adopted by the River and Harbor Act of
March 3, 1905 (H. Doc. No. 283, 56th Cong., 1st sess., and Annual
Report for 1900, p. 1520). The latest published maps are in the
project document, and House Document No. 262, Seventy-second
Congress, first session.
   Recommended modifications of project.-Under date of February
29, 1932, the Chief of Engineers recommended modification of the
existing project so as to provide for widening the north and south
  1 Exclusive of available funds.
168                REPORT     OF CHIEF      OF ENGINEERS, U.            S. ARMY,            1934


entrance channels to 150 feet and for widening the channel along the
wharf fronts to 250 feet, the depths of all channels to be 12 feet at
mean low water, at an estimated cost of $7,600, with maintenance
at an estimated rate of $1,000 annually, in addition to that now
required. (H. Doc. No. 262, 72d Cong., 1st sess.)
   Local cooperation.-None required by law. In lengthening piers
and constructing ferry slips along the southern half of the water
front under a permit issued by the War Department, the channel in
this section previously dredged by the United States has been oblit-
erated; in lieu thereof the permittee has excavated along the water
front of the new construction without cost to the United States a
channel of the same dimensions as that previously dredged by the
United States.
    Terminal facilities.-Water terminals, seven in number, with
available dockage of 4,212 feet, are located along the water front of
Tarrytown; one has railroad connection. Five, with available dock-
age of 2,020 feet, are privately owned; 1, with available dockage of
800 feet, is owned by a corporation; and 1, with available dockage
of 1,392 feet, is owned by the city; 2 are provided with ferry racks.
   The existing terminals are adequate for present commerce.
   Operations and results during fiscal year.-None.
      Condition at end of fiscal year.-The project was completed in
1928 at a saving of $5,146 under the estimated cost. The controlling
depth at mean low water, as shown by an examination made in
May 1933 was 12 feet throughout the entire length of channel of
navigable width varying from 40 to 150 feet, except in the south
reach near the entrance from the Hudson River where it is 11.7 feet
deep for a width of 100 feet. The total cost and expenditures to
June 30, 1934, were $102,170.91-$50,853.43 for new work and
$51,317.48 for maintenance.
  Proposed operations.-No funds are available and no operations
proposed during the fiscal year 1935.
   It is believed that maintenance will be necessary to restore the
channel to project dimensions during the fiscal year 1936. There-
fore, the sum of $10,000 can be profitably expended during that year
under contract during August 1935.
                                       Cost and financial summary
Cost of new work to June 30, 1934_______________________________                                 $50, 853. 43
Cost of maintenance to June 30, 1934_______________________                                       51, 317. 48

       Total cost of permanent work to June 30, 1934_____________ 102, 170. 91
Net total expenditures_______-___________________                102, 170. 91
Total amount appropriated to June 30, 1934_____________________ 102, 170. 91

              Fiscal year ending June 30         1930       1931          1932           1933              1934


Cost of new work .......
Cost of maintenance ---------------------         $57. 17    $14. 73   $13, 170. 91 -----------     ---------

Total expended-------------------------           127. 13     17. 44    13, 170. 91 -
Allotted..........----    ..
                         --------------------- ----------- --------     13, 170. 91       _
                                                                                        -....     -__-_-        ......

Amount that can be profitably expended in fiscal year ending June 30,
  1936, for maintenance----     -   -    -     -     -   -     ___ -_  $10, 000
      RIVERS AND HARBORS-FIRST NEW YORK,         N. Y., DISTRICT   169
                   25. PEEKSKILL HARBOR, N. Y.

   Location.-This harbor is an indentation about five-eighths of a
mile long and 11/4 miles wide in the eastern shore of Hudson
River, 42 miles above the Battery, New York City. (See U. S. Coast
and Geodetic Survey Chart No. 282.)
   Existing project.--This provides for a channel 10 feet deep at
mean low water, 100 feet wide and about 1.8 miles long, extending
from deep water in Hudson River north of the village to deep water
south of it, following generally the contour of the shore, and two
turning basins, 200 by 150 feet, of the same depth in front of the
lower and center wharves. Mean tidal range, 2.6 feet; mean range
of spring tides, 3.2 feet; extreme range, 7.1 feet; irregular fluctua-
tions are infrequent and do not materially affect navigation.
   The estimate of cost for new work in 1896 was $50,000. The
latest (1928) approved estimate for annual cost of maintenance is
$4,000.
   The existing project was adopted by the River and Harbor Act of
June 3, 1896 (H. Doc. No. 37, 53d Cong., 3d sess., and Annual Re-
port, 1895, p. 999). The project was modified in 1896 (Annual Re-
port, 1896, p. 839). For latest published map of the locality, see
Annual Report for 1903, page 885.
   Local cooperaiion.-Nonerequired by law. Prior to 1913 the local
authorities expended $909 in removing shoals formed by the deposit
of sewage, and private interests expended $150,000 in the construc-
tion of a public wharf and $10,000 in dredging in front of it.
   Terminal facilities.-Water terminals, five in number, with avail-
able dockage of 2,240 feet, are located along the water front in
Peekskill; none has railroad connections. Two of the terminals,
with available dockage of 1,420 feet, are privately owned; one of
these, with available dockage of 650 feet, is open to the public. One
with available dockage of 200 feet is owned by the New York Cen-
tral Railroad, and two with available dockage of 620 feet are used
by a corporation. Four with available dockage of 1,470 feet are
provided with mechanical appliances for handling cargoes.
   The existing terminals are adequate for present and prospective
needs of commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The project was completed in
1899, at a saving of $30,600 under the estimated cost. The control-
ling depth at mean low water as shown by an examination made
in June 1933, was 10 feet through a navigable channel varying from
50 to 100 feet in width for the entire length of the project channel.
   The total costs and expenditures to June 30, 1934, were $56,171.99-
$19,400 for new work and $36,771.99 for maintenance.
   Proposed operations.-No funds are available and no work is con-
templated during the fiscal year 1935.
   It is believed that dredging for maintenance will be necessary to
restore the channel to project dimensions during the fiscal year 1936.
Therefore, the sum of $10,000 can be profitably expended during that
year in maintenance dredging by contract during September 1935.
170          REPORT         OF   CHIEF OF ENGINEERS, U.                S. ARMY,                 1934

                                   Cost and financial summary

Cost of new work to June 30, 1934--------------------------      $19, 400. 00
Cost of maintenance to June 30, 1934----------------------------36, 771. 99

      Total cost of permanent work to June 30, 1934--------------                                          56, 171. 99
Net total expenditures..                                                                                     , 171. 99
                                                                                                           5-----------------------------
Total amount appropriated to June 30, 1934 --        --                                                    56, 171. 99

    Fiscal year ending June 30         1930        1931           1932                   1933                    1934


Cost of new work--------------                                              ----                           --    -
Cost of maintenance-------------        $269. 54    $168. 38        $52. 15                                  -       -

Total expended         --                222. 86     236. 11          89. 05
A llotted ......   .               -                           - 3, 378. 01 --------------..............



Amount that can be profitably expended in fiscal year ending June 30,
1936, for maintenance-----------------------------                   $10, 000

                                 26. WAPPINGER CREEK, N. Y.

   Location.--This creek is a small stream which empties into Hudson
River from the east, about 64 miles by water north of the Battery,
New York City, and one-half mile below the village of New Ham-
burg, N. Y. (See U. S. Coast and Geodetic Survey Chart No. 283.)
   Existing project.-This provides for a channel 8 feet deep at mean
low water, 80 feet wide and about 2 miles long, extending from the
mouth to about 200 feet below the lower falls. Mean tidal range, 2.7
feet; mean range of spring tides, 3.3 feet; extreme range, 7.1 feet;
irregular fluctuations are infrequent and do not materially affect
navigation. The estimate of cost of new work, made in 1890, was
$13,000. The latest (1928) approved estimate for annual cost of
maintenance is $750.
   The project was adopted by the River and Harbor Act of Septem-
ber 19, 1890 (H. Doc. No. 25, 51st Cong., 1st sess., and Annual Report,
1890, p. 758). For latest published map see Annual Report for 1904,
page 1051.
   Local cooperation.-None required by law. About 1890, local in-
terests expended $34,000 in dredging a channel for boats carrying
freight from the head of navigation to the railroad bridge and
about $500 on a public wharf.
   Terminal facilities.-Water terminals, 5 in number, with avail-
able dockage of 2,415 feet, are located-1 with available dockage
of 75 feet on the north side of the railroad trestle bridge and directly
connected with the railroad, 1 with available dockage of 300 feet
just north of the highway bridge, 1 with available dockage of
300 feet about 1 mile below the head of navigation, and 2 with
available dockage of 1,740 feet close to the head of navigation. All
are privately owned.
   The existing terminals appear to be adequate for existing
commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscail yea~.-The project was completed in
1892. As shown by an examination made in May 1931, the con-
trolling depth at mean low water was 8 feet from the Hudson River
            RIVERS AND HARBORS-FIRST                         NEW YORK,         N. Y., DISTRICT                         171
up to the head of the improvement. The total costs and expenditures
to June 30, 1934, were $41,332.02-$13,000 for new work and
$28,332.02 for maintenance.
  Proposed operations.-No funds are available and no operations
contemplated during 1935.
  It is believed that dredging for maintenance will be necessary to
restore the channel to project dimensions during the fiscal year 1936.
Therefore, the sum of $5,000 can be profitably expended on this work
by contract during August 1935.
                                    Cost and financial ,swmmary
Cost of new work to June 30, 1934-----------------------------   $13, 000. 00
Cost of maintenance to June 30, 1934---------------------------- 28, 332. 02
      Total cost of permanent work to June 30, 1934--------------41, 332. 02
Net total expenditures---------------------------------------       41, 332. 02
Total amount appropriated to June 30, 1934----------------------41,     332. 02

           Fiscal year ending June 30            1930            1931         1932               1933                1934


Cost ofnew work...--------------------------------                                         -                 --
Cost of maintenance . .------------------- $8, 176. 04          $376. 67        $27. 12   -----------               -
                                                                                                                  ---.........

Total expended        -----------------------   8,172. 34        362. 09        112. 72 ---             -.
Allotted     -----------------------------      9, 900. 00    _-..         -- 1, 417. 98 .---


Amount that can be profitably expended in fiscal year ending June 30,
1936, for maintenance-------------------------------------------     $5,000
                                 27. RONDOUT HARBOR, N. Y.
   Location.-This harbor comprises the tidal mouth, about one-half
mile in length of Rondout Creek, whose source is about 18 miles
west of Rondout. The creek empties into the Hudson River from
the west, about 89 miles north of the Battery, New York City, and
55 miles south of Albany. (See U. S. Coast and Geodetic Survey
Chart No. 283.)
   Existing project.-This provides for a channel across the mud
flats at the mouth of the creek, about 3,000 feet long, 14 feet deep at
mean low water, and 100 feet wide, to be secured by dredging; for
two parallel dikes 350 feet apart, to maintain the channel, and
for a branch dike to extend upstream from the outer end of the
north dike to protect that dike from running ice in Hudson River.
Mean tidal range, 3.4 feet; mean range of spring tides, 4.4 feet; ex-
treme range, 8 feet; irregular fluctuations, due to freshets, are infre-
quent and do not materially affect navigation. The estimate of cost
for new work made in 1872 was $172,500. The latest (1928) ap-
proved estimate for annual cost of maintenance is $3,000.
   The project was adopted by the River and Harbor Act of June 10,
1.872 (S.Doc. No. 35, 42d Cong., 2d sess.). For latest published
maps see House Document No. 390, Sixty-fourth Congress, first ses-
sion, and Rivers and Harbors Committee Document No. 17, Seventy-
third Congress, second session.
   Recommended modifications of project.-Under date of June 17,
1933, the Chief of Engineers recommended modification of the exist-
ing project so as to provide a channel 100 feet wide, widened at the
bends, and 14 feet deep from deep water in Hudson River to the
172      REPORT OF      CHIEF OF ENGINEERS,         U.   S. ARMY,       1934


Broadway Bridge, 11/4 miles above the mouth, thence 12 feet deep
to the west end of Island Dock, 1.8 miles above the mouth, at an esti-
mated cost of $15,000 for new work, with maintenance estimated at
 $2,000 annually in addition to that now required, subject to certain
conditions of local cooperation (Rivers and Harbors Committee
Doc. No. 17, 73d Cong., 2d sess.).
    Terminal facilities.-The terminal facilities served by the im-
provement consist of nine timber wharves, aggregating 7,050 feet in
length, equipped with transfer facilities, all privately owned. The
existing terminals appear to be sufficient for the present needs of
navigation. For further details see Rivers and Harbors Committee
Document No. 17, Seventy-third Congress, second session.
    Operations and results during fiscal year.-None.
    Condition at end of fiscal year.-The project has been regarded as
completed since 1880; part of the diking originally proposed was
not built because deemed of doubtful usefulness. Two parallel dikes
of an aggregate length of about 5,000 feet, generally 350 feet apart,
with a now obsolete spur from the old lighthouse south of the south
dike, have been built across the bar at the mouth of the creek, and
a channel of project dimensions has been excavated between them
from deep water in the Hudson River to deep water in the creek, a
length of about 3,000 feet. A branch dike about 1,000 feet long
extending northerly from the outer end of the north dike was also
constructed. All of the dikes are in fair condition, except the branch
dike extending northerly from the outer end of the north dike.
Examinations made in October 1932 and January 1933 show that the
channel is shoaling. The controlling depth at mean low water was
about 12.5 feet. The total costs and expenditures of the existing
project have been $223,875.33-$90,000 for new work and $133,875.33
for maintenance.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $13,010, will be applied as follows:
Maintenance :
    Operate U. S. pipe-line dredge DeWitt Clintona and attendant plant
      two-thirds month (October 1934) in the removal of shoals which
      have formed in the entrance channel-------------------------     $10, 000
   Repair the north dike by the use of Government plant and hired
labor (August 1934) ------------------            ------    -----       3, 010

          ---------------------------------------------------
      Total_                                                                   13, 010
  The outer end of the south dike, which was reconstructed in 1933, is
being undermined and is in need of further repair. Therefore, the
sum of $3,000 can be profitably expended during the fiscal year
ending June 30, 1936, in repairing this dike.
                          Cost and financial summary
Cost of new work to June 30, 1934_ ___-   --       -       ---            $90, 000. 00
Cost of maintenance to June 30, 1934_---------------------------          133, 875. 33

      Total cost of permanent work to June 30, 1934------------           223, 875. 33

Net total expenditures----------------------------------------            223, 875. 33
Unexpended balance June 30, 1934-----------------------------              13, 010. 00

      Total amount appropriated to June 30, 1934----__              -     236, 885. 33

  1After dedtcting $10 to adjust amount in 1933 Annual Report.
            RIVERS AND HARBORS-FIRST                                 NEW YORK, N. Y., DISTRICT                              173

           Fiscal year ending June 30                        1930         1931           1932          1933            1934


Cost of ngw w ork ..........          . . .
                                     -..            . . ..   . . . . . . . . .    . . . . .
Cost of maintenance ......-                                             $1, 593. 21     -.. -        $2, 809. 51
Total expended---__            --                                        1, 593. 21    -----------    2, 809. 51            -$10
Allotted                                      -2,                          200. 00 $-1, 000. 00       2, 809. 51         13, 000


Amount allotted from War Department Appropriation                                                 Act ap-
proved Apr. 26, 1934------------                                                                              $13, 000. 00
Gross amount expended
Less reimbursements collected ---------------------------                                         $10. 00
                                                                                                                     -10.     00
      Balance unexpended June 30, 1934 ---     -  -                                                                13, 010. 00
Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1                                                                                        3, 000. 00
                                    28. SAUGERTIES HARBOR, N. Y.

   Location.-This harbor comprises about four-fifths of a mile in
length of the tidal mouth of Esopus Creek, whose source is in
Winnisook Lake about 25 miles west by south of Saugerties. The
creek empties into Hudson River from the west about 100 miles
north of the Battery, New York City, and 44 miles south of Albany.
 (See U. S. Coast and Geodetic Survey Chart No. 283.)
   Previous project.-The original project, adopted July 5, 1884,
was modified in 1887 and completed in 1892. The cost and expendi-
tures prior to commencing work on the existing project in 1902,
were $42,000 for new work and $15,000 for maintenance, a total of
$57,000. For further details, see Annual Report for 1915, page
1765.
   Existing project.-The existing project provides for a channel 12
feet deep at mean low water and 200 feet wide from deep water in
Hudson River to the steamboat wharf in the village of Saugerties,
a distance of about four-fifths of a mile, to be secured by dredging
and rock removal between longitudinal pile dikes filled with rubble
stone which were built under the previous project, and for the ex-
tension of the south dike westward about 155 feet to the shore line.
Mean tidal range, 3.7 feet; mean range of spring tides, 4.4 feet;
extreme range, 8.1 feet; irregular fluctuations due to freshets are
infrequent and do not materially affect navigation.
   The estimate of cost for new work, made in 1899, was $44,685,
exclusive of amounts expended under previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $2,000.
   The work was authorized by the following river and harbor acts:
The act of July 5, 1884, provided for longitudinal dikes (Annual
Report 1884, p. 716), and the act of June 13, 1902, provided for the
present channel dimensions and dike extension (H. Doec. No. 107,
56th Cong., 1st sess., and Annal Report 1900, p. 1518). The latest
published map is in the project document.
   Terminal facilities.-The terminal facilities served by the im-
provement consist of five timber wharves, aggregating 2,400 feet in
length. The existing terminals are sufficient for the present needs
of navigation.
  SExclusive of available funds.
174           REPORT       OF         CHIEF      OF ENGINEERS,                    U.   S.     ARMY,          1934

   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project has been con-
sidered completed since the completion of the channel excavation in
19131 although the shore extension of the south dike included in the
project has not been built because the freshets, since the completion
of the Ashokan Dam on Esopus Creek, appears to have been reduced
to a point where they have no effect in scouring the channel. The
north and south dikes are about 2,385 feet and 1,950 feet long, respec-
tively, and about 260 feet apart, and are in good condition. An
examination made in June 1931 showed that shoaling was taking
place on the south side of the entrance to the harbor. The total costs
and expenditures have been $101,198.55-$7,624.76 for rock removal,
$31,768.61 for channel dredging, and $511.54 for contingencies, a
total of $39,904.91 for new work and $61,293.64 for maintenance.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $10,000, will be applied to maintenance
dredging in the removal by contract of shoals which have formed in
the entrance channel.
   It is believed that further maintenance dredging will not be neces-
sary during the next 2 years. Therefore, no additional funds can be
profitably expended during the fiscal year ending June 30, 1936.
                                        Cost and financial summary

Cost of new work to June 30, 1934 _                                .----                                          $81, 904. 91
Cost of maintenance to June 30, 1934-                              -                                               76, 293. 64
           Total cost of permanent work to June 30, 1934--                                                        158, 198. 55

Net total expenditures __1--------58,                                                                                    198. 55
Unexpended balance June 30, 1934-                             __                                                     10, 000. 00

           Total amount appropriated to June 30, 1934__.--                                                        168, 198. 55

           Fiscal year ending June 30                  1930                1931         1932               1933             1934


Cost of new work                         -   -    --
Cost of maintenance -      -----...                     $36. 82             $66. 36    --
Total expended          -36.                                  82             15. 38         $50. 98   -                --

Allotted       --------------.                                         -500. 00                           -$51. 45           $10, 000


Amount allotted from War Department Appropriation Act approved
  Apr, 26, 1934------------ ------------------------------------- $10, 000
Balance unexpended June 30, 1934_
                                ---------------------------------- 10, 000
                                       29. HUDSON RIVER, N. Y.

   Location.--This river has its source in the Adirondack Mountains,
about 250 miles in a direct line and 315 miles following its course
to the Battery, New York City, and flows in a generally southerly
direction into New York Bay. The section under improvement ex-
tends from New York City to Waterford, a distance of about 144
miles. (See U. S. Coast and Geodetic Survey Charts Nos. 283 and
284.)
   Previous projects.-The original project for improvement by the
United States was adopted in 1834 and modified in 1852 and 1866.
      RIVERS AND HARBORS-FIRST           NEW YORK, N.      Y., DISTRICT      175
  A second project was adopted July 13, 1892, and modified in 1899.
The total cost and expenditures under all previous projects were
$5,459,390.58-$5,112,593.50 for new work and $346,797.08 for
maintenance.
  Existing project.-This provides for a channel 27 feet deep at
mean low water and 300 feet wide up to Hudson; thence 400 feet
wide through rock cuts, and 300 feet wide elsewhere, from Hudson
to the Albany-Greenbush Bridge in Albany; thence a channel 12 feet
deep at lowest low water to Waterford, with a general width of 400'
feet to the dam at Troy and 200 feet thence to Waterford, increased
at bends and widened to form harbors in front of the cities of Troy
and Albany; and removal of the State dam at Troy and the con-
struction of a lock and dam about 21/ miles below Waterford.
   The following table contains information concerning the various
features of the lock and dam included in the existing project:
Location :
    Below Waterford --------------------------------------      miles        2. 5
    Above Battery, N. Y---------o                                          152. 5-----------------
Lock :
   Clear width-------------------------------------------feet_              44. 44
    Greatest length available for full width------------------do           492. 5
    Lift at lowest stages---------------------------             do.        16. 3
    Depth on miter sills at lowest low water:
         Upper--------------------------------------------do         ---    16. 3
         Lower--------------------------------------------do                14.0
Character of foundation : Rock.
Kind of dam: Fixed.
Type of construction: Concrete.
Completed : 1917.
Cost: $1,463,014.07.
   The channel is to be formed by dredging and rock excavation, and
to be maintained by dredging and by constructing new and raising-
and repairing old longitudinal dikes, built partly under previous
projects and partly by the State of New York. The mean range of
tides at the dam in seasons of moderate rains was about 2.55 feet, as:
determined in 1903. At Broadway, Troy, the range was about 3 feet
and at Albany about 3.3 feet, as determined in 1920. At New Balti-
more it was about 3.2 feet, at Coxsackie about 3.5 feet, and at Hudson
about 4 feet. The lowest low-water plane of the pool above the
Federal dam at Troy to Waterford is 14.33 feet above mean sea level
at Sandy Hook, N. J. In the tidal section of the river below the
dam the assumed lowest low-water plane from Troy to Albany is 2
feet below mean sea level at Sandy Hook, N. J. In a measure, as
the channels above Hudson are improved, the range of tide increases
and the low-water plane, falls.
   The estimated cost for new work, revised in 1931, is $13,830,000,
exclusive of amounts expended on previous projects. The latest
 (1930) approved estimate for annual cost of maintenance is $316,000.
   The existing project was authorized by the following river and
harbor acts: The act of June 25, 1910, provided for the 12-foot chan-
nel and for the lock and dam at Troy (H. Doc. No. 719, 61st Cong.,
2d sess.); the act of March 3, 1925, provided for the 27-foot channel
from Hudson to Albany (H. Doc. No. 350, 68th Cong., 1st sess.) ;
and the act of July 3, 1930, provided for the 27-foot channel below
      91536- EN   1934-12
176     REPORT   OF   CHIEF OF ENGINEERS,    U.   S.   ARMY,   1934

Hudson, N. Y. (H. Doc. No. 210, 70th Cong., 1st sess.). For maps
showing part of the projected work see House Documents Nos. 719,
Sixty-first Congress, second session; 350, Sixty-eighth Congress, first
session; and 210, Seventieth Congress, first session.
    Supplementing the work authorized by Congress the relocation of
the 12-foot channel in the Hudson River between Troy Lock and
Dam and Waterford, at an estimated cost of $236,000 as recom-
mended by the Chief of Engineers in Senate Document No. 155,
Seventy-second Congress, second session, was included in the pub-
lic-works program under the National Industrial Recovery Act.
    Recommended modifications of project.-Included in public-works
program.
    Local cooperation.-Fullycomplied with.
    Terminal facilitie.-The piers and other terminal or transfer
facilities served by the improvement are as follows:
    Between Waterford and the Federal dam at Troy there are 14
wharves, aggregating approximately 5,000 feet in length. The State
of New York has constructed a barge-canal terminal at Cohoes. The
Ford Motor Co. has constructed a dock 325 feet long on the west side
of the river just north of the Federal dam.
    Wharves aggregating about 7,350 feet in length extend practically
the entire length of the water front of the city of Troy. The State
also proposes to construct an additional terminal just south of the
site formerly occupied by the old State dam, when needed.
    At the United States arsenal, at Watervliet, there is a stone bulk-
head 800 feet long with solid fill in the rear. Between this point
and Albany there are five timber wharves, aggregating 4,275 feet
in length.
    At Albany there are 3,800 linear feet of concrete wharf wall, with
:3transit sheds, 1 warehouse, and a 13,000,000-bushel grain elevator,
all provided by the Albany Port District Commission, approximately
10,300 linear feet of timber wharves. The State of New York has
constructed a barge-canal terminal 1,400 feet in length, and the city
of Albany has constructed concrete wharves 3,200 feet in length.
The Albany Port District Commission has constructed a concrete
wharf 3,800 feet in length at Westerlo Island. At Island Creek
  (South Albany) the Delaware & Hudson Railroad Co. owns approxi-
mately 3,100 feet of timber wharves. On Westerlo Island, south of
Albany, the Standard Oil Co. of New York has constructed a con-
;crete dock 466 feet in length.
    At Rensselaer there are approximately 1,350 feet of timber
wharves. The Albany Port District Commission has constructed a
concrete wharf 1,200 feet in length. The various oil companies
which have located south of Rensselaer contemplate the construction
of suitable wharves for the transfer of petroleum products. Be-
tween Albany and Hudson there are about 100 timber wharves, ag-
gregating 3'6,700 feet in length. At Hudson there are 12 timber
wharves, aggregating 5,000 feet in length. At Athens there are 9
timber wharves, aggregating approximately 4,000 feet. Between
Hudson and the upper limits of New York City wharves, many places
equipped with transfer facilities extend practically the entire length
of the water front of Poughkeepsie, Newburgh, Irvington, and
Yonkers. The State of New York has constructed a barge-canal
terminal at Yonkers.
      RIVERS AND HARBORS-FIRST NEW YORK, N.         Y., DISTRICT   177

  It is expected that existing wharves and those proposed will be
ample for the Hudson River traffic.
            OPERATIONS AND RESULTS DURING FISCAL YEAR

   Project adopted by Congress.-Under a continuing contract for
dredging and rock removal to a depth of 27 feet at mean low water
at Albany, Van Wies Point, and at Fitches Wharf, there were drilled
and blasted at the end of the fiscal year 606 cubic yards of rock, place
measurement. There were removed 145,450.7 cubic yards of rock and
76,211.6 cubic yards of soft material, all place measurement, and work
was in progress at the end of the fiscal year. The total cost of this
work was $261,336.23 for new work.
   Under contract for dredging and rock removal to a depth of 27
feet at mean low water at Matthews Point, work was completed
October 7, 1933. There were removed 10,018.4 cubic yards of rock
and 44,280 cubic yards of soft material, all place measurement, at a
cost of $48,815.13 for new work.
   By the use of Government plant and hired labor, major repairs
were made to Castleton Dike, Mulls Dike, and New Baltimore Dike
for a total length of 1,906 feet, and minor repairs were made to
other dikes. The total cost of this work was $67,174.36 for
maintenance.
   The total cost of engineering, surveys, and contingencies was
$43,286.49-$9,746.02 for new work and $33,540.47 for maintenance.
   The total cost of all work was $420,612.21-$319,897.38 for new
work and $100,714.83 for maintenance.           The expenditures were
$366,319.96.
   Workc anthorized by Federal Emergency Administration of Public
Works.-Under a contract for dredging and rock removal, with Pub-
lic Works funds, for the excavation of the relocated channel to
project dimensions between Troy and Waterford, work was com-
menced October 26, 1933, and was in progress at the end of the fiscal
year. There were drilled and blasted at the end of the fiscal year
115,769 cubic yards of rock, place measurement, and there were re-
moved 6,943 cubic yards of rock and 2,492 cubic yards of soft mate-
rial, all place measurement, at a total cost of $71,492 for new work.
The expenditures were $61,663.42.
    The total cost of all work was $492,104.21-$391,389.38 for neew
work and $100,714.83 for maintenance. The total expenditures were
$427,983.38.
    Condition at end of fiscal year.-About 90 percent of the existing
project has been completed. This includes the following items:
Troy Lock and Dam, removal of old dam at Troy, and construction
of 15,545 linear feet of new dikes so far as authorized at present. In
the reconstruction of old dikes 39,672 linear feet have been raised to
the adopted crest height. The work of deepening and widening the
channel under the project of 1910 has been completed with the excep-
tion of a small part of the widening to form harbors at Albany and
Troy; it is not deemed necessary to complete this widening for the
present. The work of deepening the channel south of Albany to 27
178      REPORT    OF CHIEF OF       ENGINEERS, U.       S. ARMY,     1934

feet at mean low water has resulted in the removal of soft material
from 150,000 linear feet of channel, rock, and overlying material from
8,000 linear feet of channel, and rock and overlying material from
one-half width of the channel for a distance of 4,000 feet.
   The controlling mean low-water depth from New York City to
Albany, N. Y., is 27 feet through a navigable channel of suitable
 (about 300 feet) width from New York City to Coxsackie, N. Y.,
except in the vicinity of Stockport Lighthouse where it is 150 feet
wide, thence 200 feet wide to Albany except near the Coxsackie
Lighthouse where it is about 60 feet wide. The controlling low low-
water depth from Albany to the lock and dam at Troy is 12 feet
through a navigable channel varying in width from 400 feet at
Albany to 110 feet near the south entrance to the lock at Troy.
At the lock entrance it is 11 feet deep for a width of 50 feet. The
controlling pool-level depth in the channel above the lock at Troy
to Waterford, the head of improvement, is 12 feet for a width of
about 160 feet.
   The work remaining to be done to complete the project consists
in a small amount of channel widening to complete the work of
forming harbors at Troy and Albany, completing repairs to dikes,
and completing the excavating of a channel 27 feet deep at mean low
water from Hudson to the site of the former Albany Greenbush
Bridge at Albany.
   Total costs under the existing project were construction of lock
and dam at Troy, $1,463,014.07; removal of old State dam and exca-
vation of entrance channels to new lock, $507,246.23; construction of
fender cribs at entrances to new lock, $77,627.62; dredging and rock
removal, $4,509,006.40; dredging, $4,607,411.28; construction of
dikes, $671,235.13; engineering and contingencies, $598,597.98, a total
of $12,434,138.71 for new work; dredging, $669,177.18; repairs to
dikes, $911,772.86; engineering and contingencies, $186,530.02, a total
of $1,767,480.06 for maintenance; and a grand total of $14,201,618.77.
The total expenditures under the existing project amounted to
$14,592,641.53.
   Under authority of the Federal Emergency Administration of
Public Works, the relocation of the channel Troy to Waterford has
been commenced and is about 29 percent completed. The cost was
$71,492 for new work. The expenditures were $61,663.42.
   The total costs, all funds, to June 30, 1934, were $14,273,110.77-
$12,505,630.71 for new work and $1,767,480.06 for maintenance. The
total expenditures were $14,654,304.95.
   Proposedoperations.-The balance unexpended, including accounts
receivable, at the end of the fiscal year, amounting to $307,645.90,
will be applied as follows:
Accounts payable June 30, 1934___ _______________----_-----              $77, 618. 68
New work: Complete by Oct. 24, by dredging and rock removal un-
  der a continuing contract in force, the excavation of a channel of
  project dimensions at Albany, at Van Wies Point and at Fitches
  Wharf. Amount to be expended to complete------------_-------            63, 285. 00
Maintenance :
    Complete by Oct. 22, 1934, by dredging under a con-
       tract in force, the removal of shoals which have
      formed in the channel at the southern entrance
      to the lock at Troy, N. Y. Amount to be ex-
      pended to complete__-----------                       $50, 813. 00
       RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT                             179
IMaintenance--Cont inued
    Operate United States pipe line dredge DeWitt
       Clinton and attendant plant for 31/2 months dur-
       ing the working seasons in removing shoals which
       have formed in the channel between Hudson and
       Albany (Aug. 15, 1934, to June 30, 1935) -------- $46, 710. 00
    Operate Government plant consisting of pile
      drivers, derrick boats, etc., in repairing dikes dur-
      ing the working seasons (July 1, 1934, to June
      30, 1935) as follows :
      New Baltimore Dike        ---------------------  _      34, 400. 00
        Mulls Dike        -----------------------              9,100. 00
        Minor repairs where necessary------------              8,000. 00

                                                              51, 500. 00
    Miscellaneous surveys, tidal, and current observa-
     tions pertaining to maintenance operations (July
     1, 1934, to June 30, 1935) ---------------------         17, 719. 22
                                                                            $166, 742. 22
      Total     --------------------------------------------                    307, 645.90
   The balance unexpended at the end of the fiscal year of allotment
from the National Industrial Recovery Act of 1933, amounting to
$174,336.58, will be applied as follows:
Accounts payable June 30, 1934___        -----------                $9, 828. 58
New work: Complete by Sept. 25, 1934, by dredging and rock re-
  moval under a contract in force, the excavation of the relocated
  channel between Troy and Waterford. Amount to be expended
  to complete---------------------------------------               164, 508. 00
      Total     -------------------------------------------- 174, 336. 58
   The early completion of the 27-foot channel by the widening at
bends listed below is necessary to provide for the increasing com-
merce of the port of Albany. Both the 27- and 12-foot channels
should be maintained to dredged dimensions by dredging and by the
maintenance of dikes. Future maintenance costs are expected to be
somewhat greater than during the past 5 years due to the fact that
major improvement operations were in progress during the latter
period in many localities where shoalin,g will now occur. Therefore,
the sum of $460,000 can be profitably expended during the fiscal
year ending June 30, 1936, as follows:
New work:
   Complete by June 30, 1936, by dredging and rock re-
     moval under a contract to be entered into, the widen-
     ing of the bend at Van Wies Point, and the removal
     ,of isolated shoals of ledge rock between Albany and
     Hudson, at an estimated cost of_------------------    $160, 000
   Complete by Nov. 30, 1935, by dredging and widening of
     bends opposite Beacon Island, opposite Cow Island,
     opposite Nine Mile Tree Light, opposite Coeymans,
     and at Four Mile Point, at an estimated cost of_ -___ 150, 000
                                                                                 $310, 000
Maintenance :
    Remove, by contracts, shoals which may have formed
      in the channel between New York City and Water-
      ford, during the working seasons-------------------75, 000
    Repairs to dikes during the working seasons----------- 50, 000
    Miscellaneous surveys, tidal and current observations,
     pertaining to maintenance operations--                         25, 000
                                                                                   150, 000
        Total for all work------------------                                -      460, 000
180         REPORT          OF CHIEF OF ENGINEERS,                                     U.         S.    ARMY,        1934

                                                   Cost and financial summary

                                  MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934 __________________________ 1$17, 546, 732. 21
Cost of maintenance to June 30, 1934___ _____________________                                                        2 2, 114, 277. 14
      Total cost of permanent work to June 30, 1934_______                                                           19, 661, 009. 35
Value of plant, materials, e:c., on hand Ju_ e 30, 1934_________                                                         463, 704. 82
         Net total cost to June 30, 1934_______________________                                                      20, 124, 714. 17
Plus accounts receivable June 30, 1934____________________                                                                    4, 936. 62

      Gross total costs to June 30, 1934 ____________________                                                        20, 129, 650. 79
Minus accounts payable June 30, 1934___________________                                                                   77, 618. 68

     Net total expenditures____________________________                                                              20, 052, 032. 11
Unexpended balance June 30, 1934__________________________                                                               302, 709. 28

        Total amount appropriated to June 30, 1934___________                                                        20, 354, 741. 39,

      Fiscal year ending June 30                             1930              1931                 1932          1933           1934


Cost of new work ....        .            __           $1, 859, 983. 81 $1, 099, 455. 87 $497, 320. 47 $293, 032. 11          $319, 897. 38
Cost of maintenance_    _        _    _        _   _        30, 442. 66     115, 172. 62 106, 516. 70    93, 176. 30           100, 714. 83
      Total cost            _        __                 1, 890, 426.47    1, 214, 628. 49       603, 837. 17   386, 208. 41    420, 612. 21
Total expended           _                              1, 866, 989. 83   1, 273, 241. 66       892, 269. 07   490, 660. 83    366, 319. 96
Allotted_______________________________                1, 125, 000. 00      582, 300.00 -231,700.00            340, 498. 15    308, 825. 83


Balance unexpended July 1, 1933____________________________                                                              $360, 203. 41
Amount allotted from War Department Appropria-
tion act approved Apr. 26, 1934____________-___ $250,400. 00
Amount allotted from War Department appropria-
   tion Act approved July 14, 1932________________                                                     50, 000. 00
Amount allotted from War Department Appropria-
   tion Act approved Mar. 4, 1933__________                                                 _       105, 000. 00
                                                                                                                          405, 400. 00

     Amount to be accounted for                                                                                           765, 603. 41
Deductions on account of revocation of allotment-________---__                                                             96, 574. 17

      Net amount to be accounted for_                                                                                     669, 029. 24-
Gross amount expended__________________________                                                     400, 258. 69
Less:
    Reimbursements collected----------$33, 767.73
    Receipts from sales___--__ ___-_       171. 00
                                                                                                       33, 938. 73
                                                                                                                          366, 319. 9G
      Balance unexpended June 30, 1934____________________                                                                302, 709. 28
Outstanding liabilities June 30, 1934________________ 77, 618. 68
Amount covered by uncompleted contracts---------                                                    115, 208. 65
                                                                                                                          192, 827. 33
      Balance available June 30, 1934                                                                                           881. 95
                                                                                                                          1---------------------------09
Accounts receivable June 30, 1934-- ----------------------------                                                             4, 936. 62
        Unobligated balance available June 30, 1934--------------                                                         114, 818. 57
Amount (estimated) required to be appropriated for completion
  of existing project                                  ___------------------___1_                                     1,332, 000. 00
  1Increased  by $13,650 refund of liquidated damages.
    Increased by $313.19 adjustment of damage claim.
  3 Exclusive of available fulns.
          RIVERS AND HARBORS-FIRST                                    NEW YORK, N.                       Y., DISTRICT                181
Amount that can be profitably expended                                      in fiscal year ending
June 30, 1936:
   For new work 1-                                                                                                       $310, 000. 00
   For maintenance                                                                                                         50, 000. 00
                                                                                                                          1----------------------------------

          Total -------------------------------------------------                                                            460, 000. 00
                                                PUBLIC WORKS FUNDS

Cost of new work to June 30, 1934------------------------------                                                               71, 492. 00i
Cost of maintenance to June 30, 1934___________________________

      Total cost of permanent work to June 30, 1934-                                                                           1, 492. 00
                                                                                                                              7-----------
Minus accounts payable June 30, 1934_______________________                                                                    9, 828. 58

     Net total expenditures ..........-             -     -                                                                   61, 663. 42
Unexpended balance June 30, 1934_________ ____________________                                                               174, 336. 58

          Total amount appropriated to June 30, 1934______________                                                           236, 000. 00


         Fiscal year ending June 30                         1930             1931               1932              1933             1934

Cost of new work    .               --                                                                   -                      $71, 492. 00
Cost of maintenance .--              -    -       -     -                            -             --
Total expended -                -        -61,                                        _-                                              663.42
Allotted ..................................                                                                                   _ 236,000.00,

Amount allotted from National Industrial Recovery Act approved
  June 16, 1933 ---------------------------------------------  $236, 000. 00
Gross amount expended------------------------------------         61, 663.42

      Balance unexpended June 30, 1934_____________________                                                                  174, 336. 58.
Outstanding liabilities June 30, 1934________________ $9, 828. 58
Amount covered by uncompleted contracts ------------  64, 508. 00
                                                                                                                             174, 336. 58

          CONSOLIDATED COST AND FINANCIAL SUMMARY FOR HUDSON RIVER, N. Y.

Cost of new work to, June 30, 1934_________________________                                                        $17, 618, 224. 21
Cost of maintenance to June 30, 1934 _                                                                          .   3 2,114, 277. 14

      Total cost of permanent work to June 30, 1934----------                                                       19, 732, 501. 35
Value of plant, materials, etc., on hand June 30, 1934 ........                                                         463, 704. 82
      Net total cost to June 30, 1934 -----                                         ________-__--                   20, 196, 206. 17
Plus accounts receivable June 30, 1934                                                                                    4, 936. 62
     Gross total costs to June 30, 1934___ _____-________---                                                        20, 201, 142. 79
Minus accounts payable June 30, 1934________--------------                                                               87, 447. 26
      Net total expenditures----- ________-______         _                                                          20, 113, 695. 53
Unexpended balance June, 30, 1934----------------------------                                                           477, 045. 86
          Total amount appropriated to June 30, 1934 ------------                                                   20, 590, 741. 39

   Fiscal year ending June 30                   1930                 1931                   1932                1933              1934

Cost of new work...------------ $1,859, 983. 81              $1,099, 455. 87             $497, 320. 47       $293, 032. 11     $391, 389. 38
Cost of maintenance...------------  30, 442. 66                 115, 172. 62              106, 516. 70         93, 176. 30      100, 714. 83'
       Total cost----------__              1,890, 426. 47     1, 214, 628. 49             603, 837. 17        386, 208. 41      492, 104. 21
Total expended. --------------             1,866, 989. 83     1, 273, 241. 66             892, 269. 07        490, 660. 83       427, 983. 38,
Allotted--------
         ....          -- ---------- 1, 125, 000. 00               582, 300. 00      -231, 700. 00            340, 498. 15       544, 825. 83,
   1Exclusive  of available funds.
   2 Increased by $13,650 refund of liquidated damages.
    SIncreased by $313.19 adjustment of damage claim.
182        REPORT OF CHIEF OF ENGINEERS,                              U. S. ARMY,                          1934

Balance unexpended July 1, 1933__-                                                                          $360, 203. 41
Amount allotted from War Department Appropria-
  tion Act approved Apr. 26, 1934-----------------__ $250, 400. 00
Amount allotted from War Department Appropria-
  tion Act approved July 14, 1932 ..       -      -    50, 000. 00
Amount alloted from Emergency Relief and Con-
  struction Act approved July 21, 1932-------------   105, 000. 00
Amount alloted from National Industrial Recovery
  Act approved June 16, 1933--------------------- 236, 000. 00
                                                                                                             641, 400. 00
      Amount to be accounted for----------------------------     1, 001, 603. 41
Deductions on account of revocation of allotment----------------     9,6, 574. 17

         Net amount to be accounted for--                                                                    905, 029. 24
Gross amount expended_                                                        $461,922. 11
Less :
    Reimbursements collected--                            $33, 767. 73
      Receipts from sales-                   ---               171. 00
                                                                                       33, 938. 73
                                                                                                             427, 983. 38

       Balance unexpended June 30, 1934-_                                                                    477, 045. 86
'Outstanding liabilities June 30, 1934_   _                                           $87, 447. 26
Amount covered by uncompleted contracts--                                             279, 716. 65
                                                                              -                              367, 163. 91

        Balance available June 30, 1934__--                                                                  100, 881. 95
Accounts receivable June 30, 1934__ __-_ __                                                                       4, 936. 62

        Unobligated balance available June 30, 1934--                                              _         114, 818. 57

Amount (estimated)           required to be appropriated for completion
  of existing project 1__                                                                                  1, 332, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1936 :
      For new work 1 ---------------                                                                         310, 000.00
      For maintenance                       -----------                                                      150, 000. 00
               1   _     -   - -   --   -                     -   -   -   -       -    -   -   -       -     4 60 , 0 0 0 .       0
        Total _                                                                                                               0

:30. OPERATING AND CARE OF LOCK AND DAM IN HUDSON RIVER
                       AT TROY, N. Y.

   The improvement for which report is made under this caption
forms part of the project for improving Hudson River, N. Y. See
pages 174 to 182, where general information regarding the improve-
ment can be found. The completed lock and dam have been operated
and maintained under the permanent indefinite appropriation since
August 18, 1915.
   Operations and results during fiscal year.-The lock and dam are
situated at Troy, N. Y., and were constructed in a pool formed by the
old State dam and lock, formerly located 1,400 feet south. Opera-
tion of the lock for the 1933 navigation season was suspended Decem-
ber 16, 1933. Operations for the season of 1934 were commenced on
April 6, 1934. The cost of work during the fiscal year was as fol-
lows: Operations, $14,630.14; maintenance and repairs, $4,492.95-a
total of $19,123.09. The total expenditures were $19,605.72.
  1Exclusive of available funds.
            RIVERS AND IHARBORS-FIRST NEW YORK, N.                                                  Y., DISTRICT              183

  Condition at end of fiscal year.-The existing works are in good
condition, excepting the south fender booms, which will have to be
repaired, and the fences along the north and east boundary lines of
the reservation should be reconstructed. The total cost to June 30,
1934, was $434,978.66 and the total expenditures were $434,041.97.
  Proposed operations.-The lock and dam will be operated and
maintained under allotments from appropriations made available
for such purposes.
                                         Cost and fnancial summary

Cost of maintenance to June 30, 1934_..                         $434, 978. 66
Minus accounts payable June 30, 1934---------------------------       936. 69

     Net total expenditures -----------------------------------                                                    434, 041. 97
Unexpended balance June 30, 1934------------------------------                                                          970. 15

        Total amount appropriated to June 30, 1934________________                                                 435, 012. 12

        Fiscal year ending June 30                                1930         1931          1932          1933            1934


C ost of new work .. . .     . .       . .         . .   . .    . . . . . . . . . . . . . . . . . . . .                  . . . .
Cost of maintenance___:                                        $23, 894. 34 $23, 031. 90 $26, 679. 86 $18, 311. 33       $19, 123. 09
Total expended__________________________                       23, 949. 93   23, 374. 60   26, 548. 48   18, 735. 47      19, 605. 72

Allotted_    -   ___
                  -  - . - _-__
                             _-    -         ._
                                              --          ._ 20, 000.00      24, 000. 00   25, 000. 00   20, 323.99       18, 575.87



Balance unexpended July 1, 1933--------------------------------     $2, 000. 00
Amount allotted from permanent indefinite appropriation, section 6,
  River and Harbor Act, Mar. 3, 1909--------------                                               -----                 20, 500. 00

     Amount to be accounted for-------------------------------                                                         22, 5001. 00
Deductions on account of revocation of allotment_....___--------                                                        1, 924. 13
      Net amount to be accounted for      _,,                                                                          20, 575. 87
Gross amount expended_----------------------------------                                                               19, 605. 72

            Balance unexpended June 30, 1934-                                                                             970. 15
Outstanding liabilities June 30, 1934-______________---___--                                                              936. 69

     Balance available June 30, 1934-----------------------------      33.46
Amount allotted for fiscal year 1935 _________________-------__   20, 500. 0()

            Balance available for fiscal year 1935--- ----                                     __-___-___              20, 533. 46

                 31. NARROWS OF LAKE CHAMPLAIN, N. Y. AND VT.

   Location.-This waterway is the southern end of Lake Champlain,.
37 miles long, between Whitehall and Crown Point, N. Y. The por-
tion included in the project extends from Whitehall, N. Y., at the
southern extremity of the lake, northerly to Benson Landing, Vt.,
a distance of 131/2 statute miles. (See U. S. Lake Survey Chart No.
174.)
   Previous projects.-Adopted by acts of July 4, 1836, March 3,
1837, July 7, 1838, August 5, 1886, July 13, 1892, and March 3, 1899.
The total cost and expenditures under all projects amounted to
$134,140.35-$115,000 for new work and $19,140.35 for maintenance.
For further details, see page 256, Annual Report for 1932.
  Existing project.-This provides for a channel extending from
Whitehall, N. Y., at the head of Lake Champlain, to Benson Land-
184       REPORT     OF CHIEF       OF ENGINEERS, U.   S. ARMY,    1934

ing, to be 12 feet deep at low lake level and of a general width of
200 feet on the bottom, and the installation of fender booms at Putts
Rock, Putts Leap, Narrows near Dresden, Pulpit Point, and Cedar
Mountain. The reference plane of the low lake level is 92.5 feet
above mean sea level at Sandy Hook, N. J. The length of the section
included in the project for improvement is about 131/2 statute miles.
The usual annual variation of the lake level is from 4 to 5 feet, and
the extreme variation varies from 0.6 foot below up to 9.3 feet above
the low lake level. The estimate of cost for new work revised in
1928 is $1,196,000, exclusive of amounts expended on previous proj-
ects. The latest (1918) approved estimate for annual cost of main-
tenance is $5,000.
   The existing project was adopted by the River and Harbor Act of
August 8, 1917 (H. Doc. No. 1387, 62d Cong., 3d sess.). The latest
published map is in the project document.
    Terminal facilities.-The only terminal facilities which serve the
improvement are located in Whitehall Harbor and consist of three
timber wharves, aggregating 4,200 feet in length. The State of New
York has constructed a barge-canal terminal at Whitehall, just south
of the terminus of the canal, which has been equipped with a 15-ton
hand-operated derrick and a storehouse.
   Operations and roesults during fiscal year.-The Fort Montgomery
gage was maintained at a cost of $341.82 for maintenance. The
expenditures were $340.99.
   Condition at end of fiscal year.-The project is about 47 percent
completed. A channel 12 feet deep at low lake level and least width
of 150 feet has been excavated throughout the: length of the im-
provement, except at the Elbow, where it is but 110 feet wide. Fen-
der booms have been placed at the Elbow (Putts Leap) and oppo-
site the Delaware & Hudson Railroad Co.'s coal trestle; none now
.appear to be needed at the Narrows near Dresden, Pulpit Point,
and Cedar Mountain; the latter are in good condition. The control-
iling depths at low lake level on June 30, 1928, through the reach
included in the project, were as follows:

                               Locality                       Depth           Width


                                                                  Feet         Feet
Whithall to the Elbow--                                                  12           150
At the Elbow_-                                                           12           110
From the Elbow to Benson Landing                                         12           150



   The work remaining to be done to complete the project consists
in increasing the width of the channel throughout its project length
from the widths given in the above table to the project width of 200
feet by dredging and rock removal.
   The total cost of the existing project up to June 30, 1934, was
:$598,328.84; $566,811.14 for new work, and $31,517.70 for mainte-
nance. The total expenditures were $598,313.28.
   Proposed operations.-The balance unexpended, at the end of the
fiscal year, amounting to $978.66, will be applied as follows:
           RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT                                                                             185
Accounts payable June 30, 1934 -------------------------------------      $15.56
Maintenance :
    Repair fender booms at the Elbow and opposite the Dela-
      ware & Hudson Railroad trestle, during the working
      seasons ----------------------------------------           $583. 10
    Operation of Fort Montgomery gage (July 1934 to June
           1935)         -__----------------_                                                                           380.00
                                                                                                                                        963. 10
        Total                                                            ____________________
                                                                              -------                                             _     978.66

   It is proposed not to do any new work in the channel for the pres-
ent, as it appears to meet the needs of existing commerce. Additional
funds will be needed to pay the cost of maintaining the Fort Mont-
gomery gage, for the repair of fender booms at the Elbow and oppo-
site the Delaware & Hudson Railroad trestle, and for necessary an-
nual inspection of the waterway. Therefore, the sum of $800 can be
profitably expended during the fiscal year ending June 30, 1936, as
follows:
Maintenance :
    Repair fender booms during the working seasons_        --                                                                              $420
    Operate Fort Montgomery gage (July 1935 to June 30, 1936)___                                                                            380
     Total_-----------------------__---_                                                                                                    800
                                                       Cost and financial summary
Cost of new work to June 30, 1934 _______           -------        681, 811. 14
Cost of maintenance to June 30, 1934----------------------     _    50, 658. 05
       Total cost of permanent work to June 30, 1934-------------- 732, 469. 19
Minus accounts payable June 30, 1934 ------------------------            15. 53
           Net total expenditures _--__                                     _        ---------                                  732, 453. 63
Unexpended balance June 30, 1934--------------------------------                                                                        978. 66
           Total amount appropriated to June 30, 1934                                                      ----       ____ 733, 432. 29

           Fiscal year ending June 30                                     1930              1931           1932        1933             1934


Cost of new work --                                                                    --
Cost of maintenance ---------------------                                  $70.41           $271. 60       $715. 21   $182. 46           $341. 82
Total expended                        _--                                  138. 99               237. 83    748. 98     167. 73           340. 99
Allotted     ------------------------------                                500. 00               500. 00               481. 0             951. 25


Balance unexpended July 1, 1933___                                                                                                     $368.40
Amount allotted from War Department Appropriation Act approved
March 4, 1933----------- ------------------------------------                                                                        1,000.00
      Amount to be accounted for_--------------------------------                                                                     1, 368. 40
Deductions on account of revocation of allotment ------------------                                                                       48. 75
      Net amount to be accounted for_------------------_                                                                              1, 319. 65
Gross amount expended                                                       _ _-----------------------------                            340. 99
      Balance unexpended June 30, 1934-------------------------                                                                         978. 66
Outstanding liabilities June 30, 1934------------------------------                                                                      15. 56
      Balance available June 30, 1934----------------------------                                                                       963. 10

Amount (estimated) required to be appropriated for completion of
   existing          project          1-------------------------------                                                          629, 200. 00

Amount that can be profitably expended in fiscal year ending June
   30, 1936, for maintenance                                1   ______                                                              800.00
                                                                                                                        ___--------------
  1
      Exclusive of available funds.
186     REPORT OF   CHIEF OF ENGINEERS,      U.   S. ARMY,   1934

                    32. BURLINGTON HARBOR, VT.

   Location.-This harbor, about 100 acres in extent, is located in a
half-moon-shaped indentation in the eastern shore of Lake Cham-
plain, about 40 statute miles south of the international boundary line,
70 statute miles north of the southern end or head of the lake, and 20
statute miles southeast of the harbor at Plattsburg, N. Y. (See U. S.
Lake Survey Chart No. 172.)
   Existing project.-This provides for an irregular-shaped break-
water 6,000 feet long located about 1,000 feet from the shore, and
practically parallel with it, to be built of stone-filled timber cribs,
capped with large stone or concrete. The completed breakwater is
to be in two sections, the northerly 500 feet being separated from the
southerly 5,500 feet by a gap 200 feet wide, for the purpose of safety
in entering the harbor during storms. The reference plane of low
lake level is 92.5 feet above mean sea level at Sandy Hook, N. J.
The level of the lake has varied from 0 6 foot below up to 9.3 feet
above low lake level, but the usual annual variation is 4 to 5 feet.
The estimate of cost for new work, revised in 1928: was $1,095,000.
The latest (1928) approved estimate for annual cost of maintenance
is $8,000.
   The existing project was authorized by the following river and
harbor acts: The act of July 4, 1836, provided for the first 1,000 feet
of the breakwater (H. Doc. No. 131, 23d Cong., 1st sess.); the act of
July 12, 1866, provided for a 1,500-foot extension (H. Doc. No. 56,
39th Cong., 2d sess., and Annual Report for 1886, pp. 17 and 179);
the act of March 3, 1875, provided for a 2,000-foot extension (An-
nual Report for 1874, p. 274); and in 1886 a plan was adopted for
an extension southerly of 1,000 feet and northerly 500 feet (Annual
Report for 1887, p. 2407). The latest published map is in the
Annual Report for 1897, page 3298.
   Terinial facilities.-The terminal facilities which serve the im-
provement consist of 20 wharves, aggregating 15,790 feet in length.
The existing terminals appear to be sufficient for the present needs of
commerce.
   Operations and results during fiscall year.-None.
   Condition at end of fiscal year.-The project has been regarded as
practically completed since 1890; part of the breakwater originally
proposed was not built, the work completed being considered suffi-
cient for the needs of navigation. A breakwater has been built in
two sections, 364 feet and 3,793 feet in length, respectively, separated
by a gap of 200 feet. The stone superstructure near the southern
end of the southern section of the breakwater has been displaced by
wave action and the failure of the timbers in the tops of the wooden
cribs. The controlling depth in June 1928 was about 8.5 feet at low
lake level at the wharves, increasing considerably toward the
breakwater.
   The distinction between new work and maintenance was not made
in the early reports, hence it is impossible to separate the costs prior
to July 1, 1886. The total costs and expenditures under the exist-
ing project amounted to $880,798.82; since June 30, 1886, the cost
of maintenance amounted to $174,384.71, leaving $706,414.11 as the
cost of new work, including maintenance prior to July 1, 1886.
         RIVERS AND HARBORS-FIRST NEW YORK, N. Y., DISTRICT                                                             187
  Proposed operations.-The balance unexpended, amounting to
$5,000, will be applied to minor repairs to the breakwater, to be com-
pleted by September 30, 1934, under contract.
  It is expected that further maintenance operations will not be
necessary during the next 2 years. Therefore no additional funds
can be profitably expended during the fiscal year ending June 30,
1936.
                                    Cost and financial summary

Cost of new work to June 30, 1934-----------------------------                                               $70, 414. 11
Cost of maintenance to June 30, 1'934                                                                         174, 384. 71

         Total cost of permanent work to June 30, 1934--                                                      880, 798. 82

Net total expenditures ----------------------------------------                                               880, 798. 82
Unexpended balance June 30, 1934---------------------___                                                           5, 000. 00

         Total amount appropriated to June 30, 1934                                                                 798. 82
                                                                                                              8----------------85,

        Fiscal year ending June 30                1930                1931              1932          1933            1934


Cost of new work       -.........                 $-_-        .....             -
Cost of maintenance                               $242. 37
                                                  $242.           $125. 38
Total expended                                     206. 23            161. 52
Allotted__         _                                                                                 -$20. 84        $5,000. 00

Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934 --------------------------------------------------- $5, 000
Balance unexpended June 30, 1934 .                       .       --             ---                                    5, 00

   33. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                       (GENERAL)

   The cost of work during the year amounted to $37,417.72; the ex-
penditures were $39,714.56. The balance unexpended, including ac-
counts receivable, at the end of the year, amounting to $48,787.66,
will be applied as needed during the fiscal year 1935 to payment of
expenses to be incurred in connection with the above items. The
additional sum of $60,000 can be profitably expended during the
fiscal year ending June 30, 1936.
                                    Cost and financial summary

Cost of maintenance to June 30, 1934--------------------------$326, 240. 43
Plus accounts receivable June 30, 1934                               904. 65
                                                                  1,-----------------------

      Gross total costs to June 30, 1934 -----------------------                                              328, 145. 08
Minus accounts payable June 30, 1934-            .--                                                            2, 748. 57

        Net total expenditures--------------------------------                                                325, 39. 51
Unexpended balance June 30, 1934_                                -----------                                      46, 883. 01

         Total amount appropriated to June 30, 1934__                                                         372. 279. 52

        Fiscal year ending June 30                1930                1931              1932          1933            1934


Cost of new work .........-                   - - - . -- - - - --                 -3- --       -- --
Cost of maintenance__                          $57, 947. 37 $59, 425. 6 $63, 860. 13 55, 837. 57     $37, 417. 72
Total expended --..           ..---.- -   -     51, 554. 04     56, 369. 31           63, 808. 77   59, 971. 83      39, 714. 56
Allotted ............................           45, 600. 00     60, 000. 00           32, 400. 00   74,701. 95       64,577.57
188        REPORT         OF    CHIEF          OF     ENGINEERS,               U.     S.   ARMY,               1934


Balance unexpended July 1, 1933 _------------------------------                                                         $22, 020.00
Amount allotted from War Department                                Appropriation Act
  approved Apr. 26, 1934-----------------------------                                            $25, 000
Amount allotted from War Department Appropriation Act
  approved Mar. 4, 1933___________---
                                 ----------------                                                    60, 000'
                                                                                                                          85., 000. 00

        Amount to be accounted                   for-_                                                                  10--------------------------
                                                                                                                     -- 107, 020. 00
Deductions on account of revocation                        of allotment-----------------20,                                   422. 43

        Net amount to be accounted for.                                ------------------                                 86, 597. 57
Gross     amount       expended-- ---------------------------                                 62, 763. 02
Less reimbursements            collected------------------------                              23, 048. 46
                                                                                                                          39, 714. 56
      Balance unexpended June 30, 1934-------------------------                                                           46, 883. 01
Outstanding liabilities June 30, 1934-----------------------------                                                         4, 895. 92

      Balance available June 30, 1934--__-        ---       ____                                                          41, 987. 09
Accounts receivable June 30', 1934_-------------------------                                                               1, 904. 65

         Unobligated balance available June 30, 1934---------------                                                       43, 891. 74

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance ---------------------------------                                                              60 000. 00

                34. Other projects for w'hich no estimates are submitted
            [Commercial statistics for these projects are given in part 2 of report]


                                                                                  Cost and expenditures
                                                                    For last full    to June 30, 1934                       Estimated
                     Nam    of project                               report see                                               amount
                                                                       annual                                               required to
                                                                    report for-   New work      Mainte-                      complete
                                                                                                 nance


2. Echo Bay Harbor, N. Y.1-....................         .              1932         2$64, 583. 89      $6, 215. 72               (3)
1. East Chester Creek, N. Y.4 .......-.         -.-.-   .              1933          199, 619. 79     153, 827. 73              $283, 000
3. Manhasset Bay, N. Y.4___                                            1932                                                      563, 000
4. Port Jefferson Harbor, N. Y.1                                       1932          171, 426. 71        10, 125. 44            6 152, 700
5. Mattituck Harbor, N. Y.7-                                           1931           94, 956. 40        84, 076. 98               81, 700
6. Sheepshead Bay, N. Y.1-                                             1931          8 33, 827. 59        3, 342. 81             (3)
7. Wallabout Channel, N. Y.1                                           1933            18,173. 69        18, 724. 16             (3)
8. Plattsburg Harbor, N. Y.1-                                          1931         9 198, 415. 13       36, 591.47              (3)
9. Port Henry Harbor, N. Y.1__                                         1931         1069. 406. 46         1,252. 75                 2, 000
10. Otter Creek, Vt.    __    -                                        1932         1160, 253. 50         5, 246. 50              13, 500
11. Peconic River, N. Y.1_                                             1874            25, 000. 00    ............               (3)
12. Sag Harbor, N. Y.1-                                                1908            59, 800.00                                (3)
13. Greenport Harbor, N. Y.1-                     -- -                1895            44, 715. 98                               (3)
14. Rouses Point, Lake Champlain, N. Y.'. .......                     1895            98, 467. 55                               (3)



  1 Condition of improvement adequate for commerce.
  2 Revoked fiscal year 1933, $504.45.
  3 Completed.
  4 Awaiting local cooperation.
  5 In addition $50,000 is to be contributed by local interests.
  6 In addition $57,000 is to be contributed by local interests.
  7 Maintenance work suspended pending action by Congress on report in H. Doc. No. 8, 71st Cong., is
sess.
  8 Revoked fiscal year 1933, $168.58.
  9 Revoked fiscal year 1933, $36.54.
  10 Revoked fiscal year 1933, $40.79.
  11Expended fiscal year 1933, $317.32, which includes $31.35, accounts payable.


   1 Exclusive of available funds.
       RIVERS AND HARBORS-SECOND                                NEW YORK, N. Y.9 DISTRICT                       189
Status of reports called for by river and harbor acts and committee resolutions


             Locality                       Authorization act
                                                                   Transmitted      Document no.       Recommen-
                                                                   to Congress                           dation
                                   i

Cromline Creek, N. Y. (prelimi-        Flood Control       Act,
nary examination for flood con-         June 26, 1934.
trol).
East River, N. Y__                 Rivers and Harbors              June   2,1934                       Unfavorable
                                     Committee resolu-
                                     tion, Jan. 29, 1934.
Echo Bay Harbor, N. Y -......      Senate Committee res-
                                     olution, May 23,
                                     1934.
Fire Island Inlet, N. Y -_---___   Rivers and Harbors
                                     Committee resolu-
                                     tion, Jan. 29, 1934.
Govenors Island, N. Y. tadapt- War Department Ap-
  ability as an airport)             propriation Act
                                     April 26, 1934
Hudson River, N. Y -               Rivers and Harbors              May 25, 1934                           Do.
                                     Committee resolu-
                                     tion, June 7, 1933.
Hudson River at Ossining, N. Y__ Rivers and Harbors
                                     Committee resolu-
                                     tion, May 11, 1933.
Jones Inlet, N. Y _         -      Rivers and Harbors
                                     Committee resolu-
                                     tion, Jan. 29, 1934.
Mamaroneck Harbor, N. Y ......      _--do _ ____-_
                                            --                     Aug. 14, 1934                       Favorable.
Mount Sinai Harbor, N. Y__-_---    Rivers and Harbors              July 1, 1933                        Unfavorable.
                                     Committee resolu-
                                     tion, Jan. 13, 1933.
New York Harbor, N. Y.:
  The Upper Bay, Constable         River and Harbor
                                     Act Aug. 8, 1917.                              H.     Doc. 183,
    Hook to Ellis Island, the Nar-
    rows, the Lower Bay, and Red   River and Harbor                Sept. 12, 1933        73d Cong.,    Favorable.
    Hook Flats (anchorage areas).    Act, July 3, 1930.                                  2d Sess.
Sag Harbor, N. Y _-_           __  Rivers and Harbors
                                     Committee resolu-
                                     tion, Jan. 29, 1934.
Sparkill Creek, N. Y__________     River and Harbor
                                     Act, July 3, 1930.



   IMPROVEMENT OF RIVERS AND HARBORS IN THE
         SECOND NEW YORK, N. Y., DISTRICT
  This district includes Staten Island, N. Y., and the northeastern
part of New Jersey from Newark Bay and its tributaries on the
north to the head of Barnegat Bay at Bayhead, N. J., on the south.
  District engineer: Lt. Col. E. D. Ardery, Corps of Engineers.
  Division engineer: Col. G. M. Hoffman, Corps of Engineers.
                                                 IMPROVEMENTS

                                                  Page                                                          Page
   Newark Bay, Hackensack and                                   9. Keyport Harbor, N. J __-                      208
     Passaic Rivers, N. J
   New York and New Jersey
                                   --.. .          190     10. Matawan Creek, N. J_____ -
                                                           11. Shoal Harbor and Compton
                                                                                                                 210
     Channels_____                                 193           Creek, N. J-                                   211
   Raritan River to Arthur Kill                            12. Shrewsbury River, N. J ..                        213
     cut-off Channel, N. J _____                   198     13. Manasquan River, N. J__.                         215
   Elizabeth River, N. J____.                      199     14. Examinations, surveys, and
   Woodbridge Creek, N. J ...                      201           contingencies (general) _                      217
   Great Kills, Staten Island,                             15. Other projects for which no
     N. Y ________                                 202           estimates are submitted__                      218
   Raritan River, N. J ________                    203
   Washington Canal and South
    River, N.J__-----------                        206
190     REPORT OF CHIEF OF ENGINEERS,      U. S.   ARMY,   1934

      1. NEWARK BAY, HACKENSACK AND PASSAIC RIVERS, N. J.

   Location.--Newark Bay is an estuary about 1 mile wide between
bulkhead lines and 6 miles long, extending southerly from the con-
fluence of the Hackensack and Passaic Rivers to Staten Island
Sound, thus connecting with the waters of Upper and Lower New
York Bay.
   The Hlackensack River rises near Haverstraw, Rockland County,
N. Y., and flows to Newark Bay. It is about 45 miles long.
   The Passaic River rises in the highlands of northeastern New
Jersey. It is about 80 miles long. (See U. S. Coast and Geodetic
Survey Charts Nos. 287 and 369 and U. S. Geological Survey chart
of New York City and vicinity.)
   Preious projects.-Adopted by acts of August 30, 1852, June 10,
1872, June 14, 1880, June 13, 1902, March 2, 1907, July 25, 1912,
March 2, 1919, and September 22, 1922. The total cost and expendi-
tures were $1,755,321.46 for new work and $442,485.44 for mainte-
nance, a total of $2,197,806.90. For further details see pages 265
and 266 of Annual Report for 1926, and page 301, Annual Report
for 1929.
   Existing project.-This provides for a channel in Newark Bay 30
feet deep and about 1,800 feet wide at the entrance, including the
removal to a depth of 30 feet of part of the rock area at Bergen
Point, shown on project map as area A (H. Doc. No. 206, 67th Cong.,
2d sess.), narrowing to 400 feet below the Central Railroad of New
Jersey bridge across the bay, and continuing with that width to the
junction of the Passaic and Hackensack River Channels, a distance
of about 5 miles, with a branch channel 30 feet deep and 400 feet
wide, widened at the turn, to the Port Newark Terminal extending
from the main channel as, far as the United States pierhead line, a
distance of 1,200 feet; a channel in the Hackensack River 30 feet
deep and 400 feet wide from the upper end of the Newark Bay
Channel to the Central Railroad of New Jersey bridge, about 1.1
miles, thence 30 feet deep and 300 feet wide to a point about 2,000
feet north of the Delaware, Lackawanna & Western Railroad bridge,
2.8 miles, thence 12 feet deep and 200 feet wide to Little Ferry, 10.1
miles, and thence 12 feet deep and 150 feet wide to the New York,
Susquehanna & Western Railroad bridge, 21/2miles, a total distance
for the Hackensack River of about 161/2 miles; and a channel in the
Passaic River 30 feet deep and 300 feet wide, from Newark Bay to a
point 3,000 feet above the Lincoln Highway Bridge, 2.6 miles; thence
20 feet deep and 300 feet wide to the Nairn Linoleum Works, about
4.4 miles; thence 16 feet deep and 200 feet wide to the Montclair &
Greenwood Lake Railroad bridge, about 1.1 miles; thence 10 feet
deep and 150 feet wide to the Eighth Street Bridge at Passaic, 7.3
miles, a total distance for the Passaic River of 15.4 miles.
   All depths refer to the plane of mean low water. The mean tidal
range in the bay, Hackensack River, and in Passaic River up to the
Montclair & Greenwood Lake Railroad bridge, is about 5 feet; in
the Passaic River at the Gregory Avenue Bridge, Passaic, it is about
4.6 feet. High easterly or westerly winds cause a fluctuation of as
much as 2 feet above or below mean tidal range.
             RIVERS AND HARBORS-SECOND   NEW YORK, N. Y., DISTRICT   191
      The estimate of cost for new work, revised in 1930, is $6,921,000,
(exclusive    of amounts expended on previous projects. The latest
   ,(1930) approved estimate for annual cost of maintenance is $152,000.
      The existing project was adopted by the following river and har-
   bor acts: The acts of March 2, 1907, and February 27, 1911, pro-
  -vided for the 16-foot channel in Passaic River (H. Doc. No. 441,
  :59th Cong., 2d sess.); the act of July 25, 1912, provided for the 20-
   foot project in Passaic River (H. Doc. No. 707, 62d Cong., 2d sess.);
   the act of January 21, 1927, provided for the 10-foot project in
   Passaic River (H. Doc. No. 284, 69th Cong., 1st sess.) ; the act of
  .July 3, 1930, provided for the 3'0-foot channel in Passaic River
    (H. Doc. No. 156, 71st Cong., 2d sess.) ; the act of July 25, 1912,
  provided for the 12-foot channel in Hackensack River (H. Doc. No.
1643, 61st Cong., 2d sess.); the act approved September 22, 1922,
  provided for the 30-foot channel in the Hackensack River below the
  Central Railroad of New Jersey bridge and the 30-foot channel in
  :Newark Bay (H. Doc. No. 206, 67th Cong., 2d sess.); and the act
   approved January 21, 1927, provided for the 30-foot channel in
  Hackensack River above the Central Railroad of New Jersey bridge
   (H. Doc. No. 429, 69th Cong., 1st sess.). The two last-mentioned
 .documents and House Document No. 156, Seventy-first Congress,
 :second session, contain the latest published maps.
      Local cooperation.-Fully complied with.
      Terminal facilities.-There are 14 publicly owned wharves, 1 of

.and
  which is owned by the Federal Government, and 242 private wharves
        piers. (For further details see Port Series No. 20, pts. II and
  III, Corps of Engineers, except for wharves and piers in the upper
  1Iackensack and Passaic Rivers.)
      Operations and results during fiscal year.-A contract for mainte-
  nance dredging of the 10-foot project in Passaic River, at Belleville
 'Bar, was commenced September 23 and completed November 15,
  1933. The cost was $31,655.62.
      The U. S. derrick E. R. 101 was employed on maintenance work
  in the draws of the Montclair & Greenwood Lake Railroad bridge
  and the Rutgers Street and Rutherford Avenue highway bridges in
  the upper Passaic River project from August 1 to 15, 1933. The cost
  was $2,797.45.
     The total cost for the year was $34,629.42, all for maintenance.
'The total expenditures were $34,847.62.
     Condition at end of fiscal year.-The existing project, as revised ih
  1930, is about 90 percent completed. The 30-foot channels in Newark
  Bay and Hackensack and Passaic Rivers are completed; the Port
Newark Terminal Channel is completed; the 12-foot channel in
IHackensack River is completed; the 20-foot channel in Passai' River
is completed to Jackson Street, Newark; the 16-foot channel in
Passaic River is completed; the 10-foot channel in Passaic River
 :above the Montclair & Greenwood Lake Railroad bridge is com-
-pleted.
     The controlling mean low-water depths on June 30, 1934, were as
follows: 29 feet in Newark Bay and 27 feet in Port Newark Terminal
4Channel; thence 30 feet to the Lehigh Valley-Pennsylvania Railroad
bridge; thence 29 feet to the Lincoln Highway bridge in Hacken-
sack River; thence 25 feet to the Pulaski Skyway bridge; thence 30
        9
                        ~-13
             1536-ENG 1934
192       REPORT OF        CHIEF OF       ENGINEERS, U.       S. ARMY,     1934


feet to a point 2,000 feet above the Delaware, Lackawanna & Western
Railroad bridge; thence 12 feet to the head of the project at the
New York, Susquehanna & Western Railroad bridge, Hackensack,
which is practically the present upper limit for commercial-boat
navigation; and in the Passaic River 28 feet to 3,000 feet above
Lincoln Highway bridge; thence 16 feet to the Erie Railroad bridge
 (Newark branch); thence 14 feet to Nairn Linoleum Works (Con-
goleum Co.); thence 13 feet to the Montclair & Greenwood Lake
Railroad bridge; thence 8 feet to the upper end of the project at
Eighth Street, Passaic. There is some commercial-boat navigation
up to Wall Street, about three-fourths of a mile above Eighth Street.
   There remains to be done to complete the project completion of the
20-foot channel in Passaic River above Jackson Street, which in-
cludes the removal of a small quantity of rock on the west side of the
channel above the Center Street bridge.
   The costs were $5,003,533.98 for new work and $1,048,635.26 for
maintenance, a total of $6,052,169.24. The total expenditures were
$6,052,167.54.
   Proposed operations.--It is proposed to apply the funds unex-
pended on June 30, 1934, amounting to $263,944.21, as follows:
Accounts payable June 30, 1934---------------------------------          $1.70
Maintenance :
    Dredging by contract to restore project dimensions in the Port
      Newark Channel and the 30-foot channel extending from the
      Lehigh Valley Railroad bridge in Newark Bay to the Central
      Railroad of New Jersey bridge in Hackensack River
      (August to December 1934) -----------------------        --- 140, 000. 00
   Dredging by contract to restore project dimensions in the 30-
      foot channel in Hackensack River, extending from the
     Central Railroad of New Jersey bridge to the Pulaski Skyway
     Bridge (August and September 1934) --------------------- 36,000. 00
   Dredging by contract to restore project dimensions in the
     Newark Bay Channel, from the southerly end up to the Port
     Newark Channel (March to June 1935) ------------------- 87,942. 51

        Total -------------------------------------------------               263, 944. 21
  All new work under the project has been completed except the
section of the 20-foot project in Passaic River above Jackson Street
which property owners requested in 1916 be not deepened.
  The additional sum of $123,000 can be profitably expended during
the fiscal year 1936, in maintenance dredging to restore project di-
mensions in Hackensack and Passaic Rivers, during the period
September 1935 to July 1936.
                              Cost and financial summary

Cost of new work to June 30, 1934________________________                 $6,758, 855. 44
Cost of maintenance to June 30, 1934----------------------                 1, 491, 120. 70
     Total cost of permanent work to June 30, 1934----------                 , 249, 976. 14
Minus accounts payable June 30, 1934-----------------------1.                            70

      Net total expenditures -------------------------------                8, 249, 974. 44
Unexpended balance June 30, 1934--------------------------                     263, 944. 21
       Total amount appropriated to June 30, 1934                           8, 513, 918. 65
  'Includes $219.90     prorated share,   idle floating plant, to operations completed   in
previous fiscal year.
         RIVERS AND HARBORS-SECOND NEW YORK, N.                                                     Y., DISTRICT             193

       Fiscal year ending June 30                    1930             1931             1932              1933             1934


Cost of new work.._______________       $469, 883. 20             $580, 796. 93    $928,081. 97      $192, 288. 10    ---------
Cost of maintenance                      203, 659. 21
                                  .---------------                 271, 131. 48      45, 074. 53      104, 484. 14      $34, 629. 42

       Total cost_-----------------                673, 542. 41    851, 928. 41     973, 156. 50      296, 772. 24       34, 629. 42

Total expended-------------------                  681, 776. 82    656, 140. 91   1, 194, 460. 44     315, 096.98        34, 847. 62

Allotted..--..__-------......-        .. __.. .. 992, 000. 00      671,000.00        72, 435. 16      222, 644. 74     295, 851. 53



Balance unexpended July 1, 1933                 -------------                                                        $2, 940. 30
Amount allotted from' War Department Appropriation
  Act approved Apr. 26, 1934-------------------- $126, 000.00
Amount allotted from War Department Appropriation
  Act approved 'Iar. 4, 1933---------------------- 170, 100. 00
                                                                                                                 296, 100. 00
Amount to be accounted for--------------------------------                                                       29, 040. 30
Deductions on account of revocation of allotment-------------__                                                      248. 47

Net amount to be accounted for ----------------------------- 298, 791. 83
Gross amount expended--------------------------35, 284. 91
Less reimbursements collected                          4-----------------
                                                       437. 29
                                                                   34, 847. 62
      Balance unexpended June 30, 1934_________________---_                                                      263, 944. 21
Outstanding liabilities June 30, 1934              -------                                                               . 70
                                                                                                                        1------------

           Balance available June 30, 1934_________-----------__                                                 263, 942. 51

Amount (estimated) required to be appropriated for completion of
   existing project              1,----------------------                                                        1,917,500.00

Amount that can be profitably expended in fiscal year ending
                                1
June 30, 1936, for maintenance ________- __-----_-   -    _ 123, 000. 00

                        2. NEW YORK AND NEW JERSEY CHANNELS

  Location.-These channels extend from deep water northwest of
Sandy Hook, through Lower New York Bay and Raritan Bay, to
Perth Amboy, and thence through Arthur Kill, lower Newark Bay,
and Kill van Kull to deep water in Upper New York Bay. This
route is located approximately along the boundary line between the
States of New York and New Jersey. (See U. S. Coast and Geo-
detic Survey Charts Nos. 285, 286, and 369.)
  Previous projects.-Adopted by acts of March 3, 1881, September
19, 1890, June 3, 1896, June 23, 1874, March 3, 1875, June 14, 1880,
August 11, 1888, May 15, 1889, October 20, 1890, June 3, 1896, June
13, 1902, June 25, 1910, and March 4, 1913. The total cost and ex-
penditures were $3,114,935.41 for new work and $584,557.24 for main-
tenance, a total of $3,699,492.65. For further details of previous
projects see pages 362, 366, and 374 of the Annual Report for 1921.
  Existing project.-This provides for a channel 30 feet deep and
400 feet wide from deep water in Lower New York Bay through
Raritan Bay and Staten Island Sound to Upper New York Bay,
with a branch channel north of Shooters Island, 20 feet deep and 400
feet wide, protected by a dike on its northern side. All depths refer
   1 Etxclusive     of available funds.
194     REPORT OF    CHIEF OF ENGINEERS,     U.   S.   ARMY,   1934


to mean low water. The mean range of tides varies between 4.7 and
5 feet. Extreme easterly or westerly winds produce fluctuations of 1
to 3 feet above or below the mean range.
   The estimate of cost, made in 1918, is $10,400,000 for new work,
exclusive of amounts expended under previous projects, and $118,000
for annual maintenance.
   The existing project was authorized by the River and Harbor
Act of September 22, 1922 (H. Doc. No. 653, 66th Cong., 2d sess.).
The latest published maps are printed in the project document.
   Supplementing the work authorized by Congress, the provision of
an anchorage area at Perth Amboy, 33 feet deep and of sufficient
size for three vessels, as recommended by the Chief of Engineers in
Rivers and Harbors Committee Document No. 17, Seventy-first Con-
gress, second session, was included in the public-works program
under the National Industrial Recovery Act.
   Recommiended modifications of project.-Included in public-works
program.
   Terminal facilities.-There are 11 publicly owned wharves and 271
private wharves and piers. (For further details see Port Series No.
20, parts II and III, Corps of Engineers.)

             OPERATIONS AND RESULTS DURING FISCAL YEAR

   Regular funds.-A contract for maintenance dredging on the
west bank of the channel at Carteret, N. J., was commenced on
March 6 and completed April 24, 1934. The cost was $4,789.90.
   The total cost for the year was $5,466.59, all for maintenance. The
total expenditures were $5,994.39.
   Work authorized by Federal Emergency Administration of Public
Works.-A contract for dredging a deep-draft anchorage for one
ship off Perth Amboy, N. J., was commenced October 12, 1933, and
was in progress at the close of the fiscal year. The cost was
$365,529.05.
   The total cost for the year was $366,160.44, all for new work. The
total expenditures were $323,055.10.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1932 at a saving of $703,512 under the estimated cost.
   On June 30, 1934, the controlling depth throughout the entire
length of the 30-foot section of the New York and New Jersey
Channels was 30 feet at mean low water, except for the reach extend-
ing from Sandy Hook to Seguine Point where the controlling depth
was 28 feet. The controlling depth in the channel north of Shooters
Island was 18 feet at mean low water.
   The costs were $9,697,090.92 for new work and $147,275.37 for
maintenance; a total of $9,844,366.29. The total expenditures were
$9,871,186.70, all regular funds.
   Under the Public Works program the project for the 3-ship anchor-
age area off Perth Amboy, N. J., prosecuted with Public Works
funds, is about 50 percent completed. An anchorage for one ship
was about 94 percent completed on June 30, 1934.
   The costs were $366,160.44, all for new work. The total expendi-
tures were $323,055.10.
   The total cost, all funds, was $10,210,526.73, of which $10,063,251.36
was for new work and $147,25.37 for maintenance.
            RIVERS AND HARBORS-SECOND NEW YORK, N. Y., DISTRICT                                                               195
    The total expenditures were $10,194,241.80.
   Proposed operations.--It is proposed to apply the regular funds
unexpended, $252,665.04, and accounts receivable, $20,336.18, on June
30, 193'4, a total of $273,001.22, as follows:
Accounts payable June 30, 1934 ____________________________-         $1, 659. 95
General working fund      -------------------------------------      25, 000. 00
Maintenance :
     Dredging with Government plant to restore project dimensions
       in the Main Ship Channel, Seguine Point Reach (July to
       November 1934) ----------------------------------------       100, 341. 27
     Dredging by contract to restore project dimensions where shoals
       occur periodically in the Staten Island Sound Channels (Sep-
       tember 1934 to June 30, 1935)-------_ ---------------------- 146,000. 00

                 Total------             ------------------------------------------                                273, 001. 22
   It is proposed to apply the funds unexpended, $66,944.90, on June
30, 1934, from the National Industrial Recovery Act of June 16,
1933, together with an allotment of $427,000, made during August
1934, from the Emergency Appropriation Act of June 19, 1934, a
total of $493,944.90, as follows:
Accounts payable_   ----------------------------------------    $43, 105.34
New work: Dredging under an existing contract to complete the
  anchorage for 3 ships off Perth Amboy (July to November 1934)_ 450, 839. 56

            Total             --------------------------------------------                                     493, 944.90
   The additional sum of $118,000 can be profitably expended during
the fiscal year 1936, in maintenance dredging by contract to restore
project dimensions where shoals occur in the Raritan Bay and Staten
Island Sound Channels during the period September 1935 to June
30, 1936.
                                            Cost and financial summary
                                       MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934------------------------     1$12, 812, 026. 33
Cost of maintenance to June 30, 1934--                               31, 832. 61
                                                                    7---------------------
      Total cost of permanent work to June 30, 1934---------    13, 543, 858. 94
Value of plant, materials, etc., on hand June 30, 1934 ..--            8, 144. 18                   -
      Net total cost to June 30, 1934----------------           13, 552, 003. 12
Plus accounts receivable June 30, 1934 ----------------------        20, 336. 18
      Gross total costs to June 30, 1934 ...........            13, 572, 339. 30
Minus accounts payable June 30, 1934_-----------------------           1,659. 95
      Net total expenditures      ---------------------------- 13, 570, 679. 35
Unexpended balance June 30, 1934        ---       --------          252, 665. 04
      Total amount appropriated to June 30, 1934-----------     13, 823, 344. 39

            Fiscal year ending June 30                     1930          1931            1932           1933           1934


Cost of new work-....------------------...$548, 016. 89 $771, 943. 70 $611, 835.70                  $46, 281.04               --
Cost of maintenance- ...............       . 55, 880. 76  75, 369. 51    2, 727. 83                      210. 09      $5, 466. 59

        Total cost- -------------                      603, 897. 65   847, 313. 21   614, 563. 53    46, 491. 13       5,466.59
Total expended ------------------                      633, 182. 72   821, 950. 93   575, 777. 35   234, 107. 33       5,994.39

Allotted ---------------------------                   174, 427. 00    56, 800. 00 -84, 935. 16 -92, 301.75          226,116.43

  1Includes $867.08 prorated share for idle floating plant to operations completed in
previous fiscal year and is less the amount of $263.62 excess rentals for floating plant
charged to cost for prior fiscal year.
196          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                         1934

Balance unexpended July 1, 1933______                           $32, 543.00
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934___----------------    $126,000.00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933 ______-     __--------  110, 000. 00
                                                                236, 000. 00

   Amount to be accounted for_       ___---------------------                                      268, 543. 00
Deduction on account of revocation of allotment----------------                                      9,883. 57

      Net amount to be accounted for ------------------------- 258, 659.43
Gross amount expended -----------------------------     97,668. 71
Less:
    Reimbursements collected _             $91, 593. 27
    Receipts from sales ------------------       81. 05
                                                        91, 674. 32
                                                                    5, 994.39
      Balance unexpended June 30, 1934 __----_________252,                                              665.04
Outstanding liabilities June 30, 1934________-----         2,207. 10
Amount covered by uncompleted contracts -------------        799. 62
                                                                                                      3, 006. 72

     Balance available June 30, 1934_______ __--------------        -- 249, 658. 32
Accounts receivable June 30, 1934______---------------      -------- 20, 336. 18

                                                       -----
          Unobligated balance available June 30, 1934____                                -__       269, 994. 50

Amount that can be profitably expended in fiscal year ending June
   30, 1936, for maintenance 1-______-----                                                         118, 000. 00

                                              PUBLIC WORKS FUNDS

Cost of new work to June 30, 1934    _________ -  -______       366, 160. 44
Cost of maintenance to June 30, 1934________________------------

      Total cost of permanent work to June 30, 1934--------------                                  366, 160. 44
Minus accounts payable June 30, 1934________________-________                                       43, 105. 34

     Net total expenditures__---------------------------------                                     323, 0155.10
Unexpended balance June 30, 1934------------------------------                                      66, 944. 90

          Total amount appropriated to June 30, 1934                        ---      -             000. 00
                                                                                           -___-390,

         Fiscal year ending June 30                        1930    1931       1932         1933          1934


Cost of new work           ..-----------------------------------
                           ..--------------------------                                               $366,160. 44
Cost ofmaintenance---            --------            ------ ----------------------------------------------
Total expended....------------              ------------ -----------------------------------           323, 055. 10
Allotted --------            -              ------------------------------------------------           390, 000. 00


Amount allotted from National Industrial Recovery Act approved
  June 16, 1933---------------------------------------------                                      $390, 000. 00
Gross amount expended_______- ______________ $325, 601. 21
Less reimbursements collected-___ __--   -_____--     2, 546. 11
                                                                                                  323, 055.10

          Balance unexpended June 30, 1934----------------------                                    66, 944. 90

     Exclusive of available funds.
           RIVERS AND HIIARBORS-SECOND NEW YORK, N. Y., DISTRICT                                                                  197
Outstanding liabilities June 30, 1934______________                                             $43, 105. 23
Amount covered by uncompleted contracts-----                                                     19, 702. 47
                                                                                                                        $62, 807. 81
    Balance available June 30, 1934-.   ------------------
                                                         _                                                                  4, 137. 09
Amount allotted by Public Works Administration, Emergency
Appropriation Act, fiscal year 1935--------------------------                                                          427, 000. 00
            Balance available for fiscal year 1935---------------_                                                      431, 137.09
        CONSOLIDATED               COST AND FINANCIAL SUMMARY                             FOR     NEW YORK AND NEW
                                               JERSEY CHANNELS

Cost of new work to June 30, 19341-------------------------- $13, 178, 186. 77
Cost of maintenance to June 30, 1934 -------------------------    731, 832. 61

      Total cost of permanent work to June 30, 1934----------                                                      13, 910, 019. 38
Value of plant, materials, etc., on hand June 30, 1934                                      ----------                   8, 144. 18
      Net total cost to June 30, 1934________________
                                       -__--     -13,                                                                   918, 163. 56
Plus accounts receivable June 30, 1934_ -_____________-___                                                               20, 336. 18

      Gross total costs to June 30, 1934------------------                                                         13, 938, 499. 74
Minus accounts payable June 30, 1934------------------------                                                            44, 765. 29

     Net total expenditures-----------------------          13, 893, 734. 45
Unexpended balance June 30, 1934---------------------------     319, 609. 94

            Total amount appropriated to June 30, 1934 ____________                                                14, 213,. 344. 39

         Fiscal year ending June 30                           1930            1931               1932            1933          1934


Cost of new work_--- --------------                       $548, 016. 89   $771, 943. 70    $611, 835. 70     $46, 281. 04   $366, 160. 44
Cost of maintenance----........----........._--------       55, 880. 76     75, 369. 51       2, 727. 83          210. 09      5, 466. 59
        Total cost._ -------------------- 603, 897. 65                     847, 313. 21     614, 563.53       46, 491.13     371, 627. 03
Total expended...--------------------                      633, 182. 72    821, 950. 93     575, 777. 35     234, 107. 33    329, 049. 49

Allotted .-..--------------------------                    174, 427. 00     56, 800. 00    -84, 935.16 -92, 301. 75         616, 116. 43


Balance unexpended July 1, 1933-----------------------------_ $32, 543. 00
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934------------------------   $126, 000
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933-------------------------    110, 000
Amount allotted from National Industrial Recovery
Act approved June 16, 1933____________________-    -  390, 000
                                                                626, 000. 00
     Amount to be accounted for-----------------------------                                                            658, 543. 00
Deductions on account of revocation of allotment--------                                                                  9, 883. 57
      Net amount to be accounted for                                                                                          659. 43
                                                                                                                        6-------------------------48,
Gross amount expended __ _______-------______--                                                     423, 269. 92
Less:
    Reimbursements collected            $94, 139. 38     ------------
    Receipts from sales------------           81. 05
                                                                                                        94, 220. 43
                                                                                                                        329, 049. 49
           Balance           unexpended                 June 30, 1934_ _ _                      _---------              319, 609. 94

  1 Includes $867.08 prorated share for idle floating plant to operations completed in
previous fiscal year and is less the amount of $263.62 excess rentals for floating plant
charged to cost for prior fiscal year.
198         REPORT OF CHIEF OF ENGINEERS,                          U.   S. ARMY,.       1934

Outstanding liabilities June 30, 1934------------------                      $45, 312. 44
Amount covered by uncompleted contracts--------                               20, 502. 00
                                                                                             $65, 814. 53
      Balance available June 30, 1934--------------------------253, 795. 41
Accounts receivable June 30, 1934---- -------------------------- 20, 336. 18

Unobligated balance available June 30, 1934 ---------------___   274, 131. 59
Amount allotted by Public Works Administration Emergency Appro-
                                _
priation Act, fiscal year 1935---------------------------  _  _ 427,000.00,

         Balance available for fiscal year 1935------------------                            701, 131. 59

Amount that can be profitably expended in fiscal year ending June
                            1- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
30, 1936, for maintenance                                                                       118,000. 00-

  3. RARITAN RIVER TO ARTHUR KILL CUT-OFF CHANNEL, N. J.

   Location.-Western portion of Raritan Bay.
   Existing project.-No work has been authorized by Congress. The,
provision of a cut-off channel off Perth Amboy, N. J., to connect
Raritan River channel with the southerly end of the channel in
Arthur Kill, 20 feet deep and 800 feet wide, as recommended by the
Chief of Engineers in House Document No. 50, Seventy-third Con-
gress, first session, was included in the Public Works program under
the National Industrial Recovery Act.
  Recommended modifications of project.-Included in the Public
Works program.
   Terminal facilities.-Through channel.
   Operations and results during fiscal year.-Under authority of the,
Federal Emergency Administration of Public Works a contract
dated October 5, 1933, for dredging part of the cut-off channel was
commenced on October 16, 1933, and was completed on June 26, 1934.
   The cost for the year was $578,839.64, all for new work, and the'
total expenditures were $530,718.34, all from Public Works funds.
   Condition at end of fiscal year.-The project is about 70 percent
completed. A channel 20 feet deep, 575 feet wide, has been com-
pleted for the full length of the project.
   There remains to be done to complete the project, construction of
the remaining 225 feet width of channel for full project length.
   The costs were $578,839.64, all for new work, and the total ex-
penditures were $530,718.34, all from Public Works funds.
   Proposed operations.-It is proposed to apply the funds unex-
pended on June 30, 1934, $69,281.66, together with an allotment of'
$244,000 made during August 1934 from the Emergency Appropria-
tion Act of June 19, 1934, a total of $313,281.66, as follows:
Accounts payable____          -__________---_______              $48, 121.30
New work: Dredging under an existing contract to complete a cut-
  off channel across Great Beds, between Perth Amboy and South
  Amboy, N. J. (July to November 1934)-------------------_       2615, 160:. 36

          Total--------------------                                                          313, 281. 66
  No additional funds can be profitably expended during the fiscal
year 1936.
  1   Exclusive of available funds.
        RIVERS AND HARBORS-SECOND                                               NEW YORK, N. Y., DISTRICT                                       199
                                           Cost and financial summary
Cost of new work to June 30, 1934________________                                                                                     $578, 839. 64
Cost of maintenance to June 30, 1934__

     Total cost of permanent work to June 30, 1934------------                                                                         578, 839. 64
Minus accounts payable June 30, 1934_________________-_____                                                                             48, 121.30
     Net total expenditures -----------------------------------                                                                        530, 718. 34
Unexpended balance June 30, 1934                            ___                                                                         69, 281. 66
           Total amount appropriated to June 30, 1934_____________                                                                     600, 000. 00

           Fiscal year ending June 30                             1930                 1931                  1932              1933          1934


Cost of new work--             --------------------------------------------.------------                                                  $578, 839. 64
Cost of maintenance ..............
      Total cost-                                         ..    ..   ..    . ..   ..    ..    . ...-------     .    . .   ..    . . . .    578,839. 64

'Total expended---    ------           -         -          -             ---                            ----------                        530,718. 34
Allotted    ..-----         ---
                            ---------                                                         ----------- -----                             00-------
                                                                                                                                           600, 000. 00



Amount allotted from National Industrial Recovery Act ap-
  proved June 16, 1933---------------------------------------$600, 000. 00
,Gross amount expended___________________________   $530, 749.84
Less reimbursements collected----------------------        31. 50
                                                                  530, 718. 34

      Balance unexpended June 30, 1934________________---____-                                                                          69, 281. 66
,Outstanding liabilities June 30, 1934________________ 48, 121. 30
Amount covered by uncompleted contracts ----------         479. 51
                                                                                                                                        48, 600. 81

    Balance available June 30, 1934________-- ______------_-20, 680. 85
Amount allotted by Public Works Administration Emergency Ap-
propriation Act, fiscal year 1935_
                                  ----------------     _--------_ 244, 000. 00

           Balance available for fiscal year 1935_---                                                    __-----                _ ' 264, 680.85

                                           4. ELIZABETH RIVER, N. J.

  Location.-This river rises in the city of East Orange, N. J., and
empties into Arthur Kill. (See U. S. Coast and Geodetic Survey
Charts Nos. 285 and 369.)
  Previous projects.-Adopted by act of March 3, 1879. The costs
on this project were $27,000 for new work and $32,944.45 for main-
tenance, a total of $59,944.45. For further details see page 1778 of
Annual Report for 1915.
   Existing project.-This provides for a channel 6 feet deep at mean
low water and 60 feet wide, extending from the mouth to the New
York & Long Branch Railroad bridge, a distance of 1 mile. The
mean range of tides at the mouth is about 4.7 feet.
   The estimate of cost for new work (1913) was $15,433.50, exclusive
of amounts expended on previous projects. The latest (1928) ap-
proved estimate for annual cost of maintenance is $5,000.
   The existing project was adopted by the River and Harbor Act of
March 4, 1913 (H. Doc. No. 750, 62d Cong., 2d sess.). The latest
published map is printed in Rivers and Harbors Committee Docu-
rnent No. 24, Seventy-second Congress, first session.
200        REPORT         OF CHIEF          OF ENGINEERS,                   . S. ARMY,        1934

   Recommended modifications of project.-Under date of April 21,
1932, the Chief of Engineers recommended modification of the exist-
ing project so as to provide for a channel 12 feet deep at mean low
water and 60 feet wide, widened at the bends, from the mouth to
Baltic Street Bridge, a distance of 1.1 miles, at an estimated cost
of $74,000, with $5,000 annually for maintenance, subject to certain
conditions of local cooperation (Rivers and Harbors Committee,
Doc. No. 24, 72d Cong., 1st sess.).
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are 10 private concerns owning
wharves, of which 4 have both rail and water facilities; the others
have no railroad connections; only 1 has any mechanical appliance
for handling freight. There is one publicly owned wharf. The
facilities are adequate for existing commerce.
   Operations and results during fiscal year.-A survey was made
during the year with a view to determining whether maintenance
dredging was necessary. The total cost and expenditures for the
year were $294.59, all for maintenance.
   Condition at end of fiscal year.-The project was completed in
November 1926. The controlling depth at mean low water on June
30, 1934, in the section of the channel covered by the project was
about 6 feet to a point 1,000 feet below First Avenue Bridge, thence
2 to 4 feet to the Central Railroad of New Jersey bridge. The costs
and expenditures have been $33,481.15 for new work and $10,846.76
for maintenance, a total of $44,327.91.
   Proplosed operations.-It is proposed to apply the funds unex-
pended on June 30, 1934, amounting to $15,000, to maintenance
dredging by contract to restore project dimensions throughout the
authorized project from the mouth of the river to the Central Rail-
road of New Jersey bridge during October and November 1934.
   No funds can be profitably expended during the fiscal year ending
June 30, 1936, as it is believed that the maintenance work planned
for the fiscal year 1935 will insure project dimensions until the fiscal
year 1937.
                                    Cost and financial summary

Cost of new work          to
                     June 30, 1934_________________________   $60, 481. 15
Cost of maintenance to June 30, 1934_ __________________11111 43, 791. 21

        Total cost of permanent work to June 30, 1934 ______                               ____ 104, 272. 36

Net total expenditures__________________---___                                                         104, 272. 36
Unexpended balance June 30, 1934_____________________                                      __           15, 000. 00

        Total amount appropriated to June 30, 1934_ ___________                                        119, 272. 36

        Fiscal year ending June 30                 1930         1931          1932          1933            1934


Cost ofnew work-......                         -    -     -                            -           -
Cost of maintenance ...--------                               $8,438. 78     $1,561.22------------           $294. 59
Total expended----------------------------------938. 78                      9, 061. 22 -----------           294. 59
Allotted --------------           ------------- $7, 447. 83   10, 000. 00                                  1-5,294. 59
     RIVERS AND HARBORS-SECOND NEW YORK, N.                 Y., DISTRICT       201

Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934----------------------------------------------   $15, 000. 00
Amount allotted from War Department Appropriation Act approved
Mar. 4, 1933------------------------------------------------   15, 000. 00
      Amount to be accounted for------------__ -------------------       30, 000. 00
Deductions on account of revocation of allotment ---------------_        14, 705. 41

      Net amount to be accounted for-----------------_                   15, 294. 59
Gross amount expended------------------------------------                   294. 59

      Balance unexpended June 30, 1934-------------------            -   15, 000. 00

                        5. WOODBRIDGE CREEK, N. J.

   Location.-This creek is a small stream, rising near Rahway and
flowing through marshes into the west side of Arthur Kill. (See
U. S. Coast.and Geodetic Survey Charts Nos. 286 and 369.)
   Previous project.-Adopted by act of March 3, 1879. The cost and
expenditures, all for new work, under this project, were $19,000.
Work under the existing project began in 1902. For further details
see page 1777 of Annual Report for 1915.
   Existing project.-This provides for a channel 8 feet deep at mean
low water, 50 feet wide on the bottom and 75 feet wide on top, ex-
tending from Arthur Kill to the Salamander Dock, a distance of
about 9,600 feet. The mean range of tides is about 5 feet. High
easterly or westerly winds cause tidal fluctuations of about 2 to 4 feet
above and below the mean range.
   The estimate of cost for new work, made in 1902, was $35,000,
exclusive of amounts expended on previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $5,000.
   The existing project was adopted by the River and Harbor Act of
June 13, 1902 (H. Doc. No. 282, 56th Cong., 1st sess., and Annual
Report for 1900, p. 1552). The latest published map is in the project
document.
   Terminal facilities.-There are 2 publicly owned wharves and
1 privately owned wharf, whose facilities are open to all on equal
terms. There are seven private wharves used exclusively for private
business. These terminals adequately provide for the handling of
the existing commerce.
   Operations and results during fiscal year.-A survey was made
during the year with a view to determining whether maintenance
dredging was necessary. The total cost and expenditures for the
year were $701.90, all for maintenance.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1908 at a saving of $4,177 under the estimated cost. Main-
tenance dredging has been performed several times since that date.
The controlling depth at mean low water on June 30, 1934, was about
7 feet from the mouth of the creek to Cutters Dock, thence 3 feet to
the upper end of the project.
   The costs and expenditures were $30,822.70 for new work and
$129,027.33 for maintenance, a total of $159,850.03.
   Proposed operations.-It is proposed to apply the funds unex-
pended June 30, 1934, amounting to $15,000, to maintenance dredg-
ing by contract to restore project dimensions in the section of the
authorized channel extending from the mouth of the creek upstream
to the head of the project during August and September 1934.
202           REPORT OF CHIEF OF ENGINEERS,                                 U.       S. ARMY,        1934


  No funds can be profitably expended during the fiscal year ending
June 30, 1936, as it is believed that the maintenance work planned
for the fiscal year 1935 will insure project dimensions until the fiscal
year 1937.
                                     Cost and financial summary

Cost of new work to June 30, 1934------------------------------                                             $49, 8221. 70
Cost of maintenance to June 30, 1934-----------------------                                                 129, 027. 33
           Total cost of permanent work to June 30, 1934 -------------                                      178, 850. 03

Net total expenditures  ----------------------------------- 178, 850. 03
Unexpended balance June 30, 1934                             15, 000. 00

           Total amount appropriated to June 30, 1934---------------193,                                         850. 03

           Fiscal year ending June 30                  1930          1931             1932         1933           1934

C ost of new work ................             -     ....... .-. .
                                                   -..                           .     .-
Cost of maintenance         ... _------------------ $12, 781. 34   $30, 000. 00 -........-.                        $701. 90
Total expanded .-----------------------              24, 785. 77   16,948. 31    $10, 982. 45   ---------           701. 90

Allotted                                                    .3-
                                                            .37     30, 000. 00 -2,069. 24-
                                                      2, 767----------------------------                         15, 701. 90


Amount allotted from War Department Appropriation Act approved
  Apr. 26, 1934-------------------------------                 $15, 000. 00
Amount allotted from War Department Appropriation Act approved
  Mar. 4, 1933_       ---------------------------------------   15, 000. 00

      Amount to be accounted for--------------------------                                                   30, 000. 00
Deductions on account of revocation of allotment---------_                                                   14, 298. 10

      Net amount to be accounted for----------------------                                                   15, 701. 90
Gross amount expended                                                                                             01.90
                                                                                                                 7-----------------------

           Balance unexpended June 30, 1934--------------- ------                                            15, 000. 00

                        6. GREAT KILLS, STATEN ISLAND, N. Y.

  Location.-GreatKills is a small harbor contiguous to lower New
York Bay, located on the southeasterly shore of Staten Island, N. Y.,
distance about 61/2 nautical miles from the entrance to upper New
York Bay to the eastward and about the same distance from Staten
Island Sound to the westward. (See U. S. Coast and Geodetic
Survey Chart No. 269.)
  Existing project.-This provides for an entrance channel from
deep water in lower New York Bay to the entrance of the harbor
in the vicinity of the present westerly end of Crooks Island about
1 mile in length, 10 feet deep at mean low water, and 150 feet wide.
The mean range of tide is about 5.0 feet. Extreme easterly or west-
erly winds produce fluctuations of 1 to 3 feet above or below the
mean range. The estimated cost, made in 1924, is $62,000 for new
work and $5,000 for annual maintenance.
  The existing project was authorized by the River and Harbor Act
approved January 21, 1927 (H. Doc. No. 252, 69th Cong., 1st sess.).
The latest published map is printed in the project document.
  Local cooperation.-Theproject was adopted subject to the follow-
ing conditions:
       RIVERS AND HARBORS-SECOND NEW YORK, N.                                                 Y., DISTRICT                     203

    That before work is commenced, local interests furnish satis-
factory assurance, first, that they will construct bulkheads in the
neighborhood of Crooks Island, as proposed by the district engineer,
for the protection of the Federal channel and the disposal of material
dredged therefrom; second, that they will furnish suitable ter-
minals, in accordance with plans to be approved by the Secretary of
War and the Chief of Engineers, and an approach to these terminals
in the inner harbor with dimensions at least equal to those in the
entrance channel; and third, that they will dredge, to a depth of
12 feet at mean low water, an anchorage basin in the inner harbor
with an area of at least 50 acres, the location thereof to be approved
by the Chief of Engineers and the Secretary of War; the inner
channel and anchorage basin to be maintained thereafter by and
.at the expense of local interests. Assurances that conditions of local
cooperation are being complied with were accepted as satisfactory
by the Chief of Engineers, July 31, 1934, and approved by the
Acting Secretary of War, August 1, 1934.
    Terminal facilities.-None. There are several piers used as small-
boat landings, none of which are used for commercial purposes.
    Operations and results during fiscal year.-None.
    Condition at end of fiscal year.-No work has been performed
under the project. There were no costs or expenditures for the
existing project to the end of the fiscal year.
   Proposed operations.-No funds are available and no work is
proposed during the fiscal year 1935.
    The sum of $62,000 can be profitably expended during the fiscal
year 1936 to be applied to completion of the project.
                                       Cost and financial aummary

Cost of new work to June 30, 1934____                                   ______
Cost of maintenance to June 30, 1934__
         Total amount appropriated to June 30, 1934______________________

         Fiscal year ending June 30                       1930     1931            1932                1933               1934


Cost of new work--------------------                                            --
Cost of m aintenance-----    ---------      -----------            --         __     .    ,    ..........     ,   ..........


Total expended-------------------------
Allotted-----------------------------------        --------      -------- -


Amount (estimated) required to be appropriated for completion of
existing project ----------------------------------------------- $62, 000
Amount that can be profitably expended in fiscal year ending June 30,
1936, for new work                                                    2, 000
                                                                      6------------------------

                                   7. RARITAN RIVER, N. J.

  Location.-This river is a moderate-sized stream rising in the
north-central part of New Jersey and flowing in a general southeast-
erly direction into Raritan Bay, between Perth Amboy and South
Amboy. (See U. S. Coast and Ceodetic Survey Chart No. 375.)
204     REPORT   OF CHIEF OF ENGINEERS,      U.   S. ARMY,   1934

   Previous projects.-A survey of Raritan River for the improve-
ment of New Brunswick Harbor was made in 1836, and in the fol-
lowing year $13,963 was appropriated for the work; the records of
this office do not show what work was done. Subsequent projects
were adopted by acts of June 18, 1878, and March 3, 1881. The cost
and expenditures on previous projects have been $673,155.32 for
new work and $111,419.43 for maintenance, a total of $784,574.75.
    For further details see page 1777 of Annual Report for 1915 and
page 359 of Annual Report for 1918.
    Existing project.-This provides for a channel 25 feet deep and
300 feet wide extending from the turn in New York and New Jersey
Channels near Great Beds Light to deep water above the bridge of
the New York and Long Branch division of the Central Railroad of
New Jersey; thence a channel 15 feet deep and 200 feet wide, ex-
tending from deep water at Keasby to Washington Canal, a distance
of 4.7 miles; thence 10 feet deep in soft material, 11 feet in rock, and
generally 100 feet wide with widening at bends to the Delaware and
Raritan Canal entrance at New Brunswick, a distance of 5.3 miles;
and for the south channel between Crab Island and the vicinity of
Ostranders Dock 3.2 miles long, 10 feet deep, and 150 feet wide.
The plane of reference is mean low water. The mean range of tides
is about 5 feet at the mouth of the river and 51/2 feet at New Bruns-
wick. High easterly or westerly winds cause irregular tidal fluctua-
tions from 1 to 2 feet above or below the mean range.
   The estimate of cost for new work, revised in 1930, is $748,000,
exclusive of amounts expended on previous projects. The latest
 (1930) approved estimate for annual cost of maintenance is $30,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 2, 1919, provided for the 15-foot
channel and the south channel (H. Doc. No. 1341, 62d Cong., 3d
sess.); the act of July 3, 1930, provided for the 25-foot channel
 (H. Doc. No. 127, 70th Cong., 1st sess.), the 10-foot channel in soft
material and 11 feet in rock (H. Doc. No. 454, 70th Cong., 2d sess.),
and the change in location of the lower reach of the south channel
(Rivers and Harbors Committee, Doe. No. 31, 71st Cong., 2d sess.).
The latest published maps are in the project documents.
   Local cooperation.-The River and Harbor Act approved July 3,
1930, authorized a change in the lower reach of the south channel
subject to the provisions that no work shall be undertaken until
assurances satisfactory to the Secretary of War and the Chief of
Engineers are received that one or more new terminals will be con-
structed on the south channel, and that necessary spoil-disposal areas
will be furnished free of cost to the United States when required.
These provisions have not been fulfilled.
   Terminal facilities.-The city of Perth Amboy owns about 1,875
feet of undeveloped frontage on Raritan River. The city of New
Brunswick owns three small sites located on the Delaware and
Raritan Canal, one of which has a small wharf on it, and also a con-
siderable frontage on the river below the outlet locks of the Dela-
ware and Raritan Canal, and has constructed a public terminal on
the site. Other private terminals are open to public use. The Gov-
ernment has established a large ammunition and storage depot and
     RIVERS AND HARBORS-SECOND NEW YORK, N. Y., DISTRICT                  205

arsenal on Raritan River known as " Raritan Arsenal." Thirty-eight
other wharves are located on Raritan River and on the Delaware and
Raritan Canal at New Brunswick, N. J. The terminals seem suffi-
cient to provide for the needs of existing commerce. (For further
details see Port Series No. 20, pts. II and III, Corps of Engineers.)
   Operations and results during fiscal year.-Surveys were made
during the year with a view to determining whether maintenance
dredging was necessary.
  The total cost for the year was $1,096.83, all for maintenance. The
expenditures were $981.44.
  Condition at end of fiscal year.-Work under the project is about
95 percent completed. A channel 25 feet deep at mean low water
and 300 feet wide has been completed from the turn in the New York
and New Jersey channels near Great Beds Light to deep water
above the Long Branch division bridge of the Central Railroad of
New Jersey, 2.1 miles above the junction with the New York and
New Jersey channels; thence natural deep water for 2.2 miles; thence
a channel 15 feet deep and 200 feet wide has been completed to the
mouth of Washington Canal, 4.2 miles; thence a channel has been
completed 10 and 11 feet deep and 100 feet wide to the Delaware
& Raritan Canal outlet lock at New Brunswick, a distance of 5.3
miles.     The south channel has been dredged 10 feet deep and 150
feet wide for a distance of 14,500 feet.        The mean low water con-
trolling depths on June 30, 1934, were 25 feet from New York and
New Jersey channels near Great Beds Light to the vicinity of the
Raritan Copper Works; thence 23 feet to the highway bridge; thence
20 feet to 500 yards below Ostranders Dock; thence 17 feet to
Ostranders Dock; thence 15 feet to the Washington Canal, thence 10
and 11 feet to the Delaware & Raritan Canal lock at New Brunswick;
in the south channel 4 feet up to Crossman Dock, thence to the
upper end of the south channel, about 3.5 feet. The work remain-
ing to be done to complete the project consists of dredging to com-
plete the south channel.
   The total costs were $685,458.91 for new work and $76,478.08 for
maintenance, a total of $761,936.99. The total expenditures were
$761,821.60.
  Proposed operations.-It is proposed to apply the funds unex-
pended June 30, 1934, amounting to $58,374.20, as follows:
Accounts payable June 30, 1934                                         115. 39
                                                                       $----------------
Maintenance :
    Dredging by Government plant to restore project dimensions in
      the south channel from its lower end up to Crossmans Dock
      (July and August 1934) ----------------------------------     28, 258.81
    Dredging by contract to restore project dimensions in the 10-11
      foot project (March and April 1935) --------------------- 30, 000. 00

         Total   --------------------------------------------- 58, 374. 20
  The sum of $30,000 can be profitably expended during the fiscal
year 1936 in maintenance dredging to restore project dimensions in
the 15-foot channel extending from deep water opposite Keasby to the
mouth of Washington Canal at Sayreville. The work will be under-
taken during March and April 1936.
206           REPORT OF CHIEF OF ENGINEERS,                                          U. S. ARMY,                 1934

                                             Cost and finanoial summary
Cost of new work to June 30, 1934------------------------ $1, 358, 614. 23
Cost of maintenance to June 30, 1934------------------------  187, 897. 51
      Total cost of permanent work to June 30, 1934-----------                                                    1, 546, 511. 74
Minus accounts payable June 30, 1934 --------------------------                                                           115. 39
     Net total expenditures  -----------------------------                                                        1, 546, 396. 35
Unexpended balance June 30, 1934                                                                                      58, 374. 20
           Total amount appropriated to June 30, 1934-------------1, 604, 770. 55

           Fiscal year ending June 30                         1930           1931            1932              1933         1934


Cost of new work---...-         ------           -      --      -   . $267, 842. 39 $168, 821. 24
Cost of maintenance-        -            -      -_       $2, 062. 08    19, 297. 27    2, 141. 05        $31,861.29        $1, 096. 83
      Total cost.----.-------------             -----        2, 062. 08 287,139. 66       170, 962. 29    31,861. 29        1, 096. 83
Total expended-------------------                                           250,582. 80
                                                               ...------------            209, 103. 26    32, 339. 26         981.44
Allotted      ..                               ...----------------------------
                                                             20, 000. 00 345, 359. 35     104, 750. 00    22, 347. 13      58, 924. 48


Balance unexpended July 1, 1933-___________                                                                               $431. 16
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934----------------------$30, 000. 00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933--------------------     28, 960. 14
                                                                                                                        58, 960. 14
     Amount to be accounted for-------------------------           59, 391.30
Deductions on account of revocation of allotment ------------------     35. 66

      Net amount to be accounted for__------------------------                                                          59, 355.64
Gross amount expended-------------------------------------                                                                  981.44

      Balance unexpended June 30, 1934---------------- __                                                               58, 374.20
                                     ----------------------------
Outstanding liabilities June 30, 1934___                                                                                   115. 39

           Balance available June 30, 1934__------------------------                                                    58, 258. 81

Amount (estimated) required to be appropriated for- -completion
                                                              - - - - - -
                                                                          of
                       ------------ ----- - - - - - - - - - -
existing project 1 --                                                       21, 000. 00

Amount that can be profitably expended in fiscal year ending June 30,
   1936, for maintenance 1-------------                                                                   --            30, 000. 00

                   8. WASHINGTON CANAL AND SOUTH RIVER, N. J.

  Location.-This river rises in central New Jersey and empties into
the Raritan River. (See U. S. Coast and Geodetic Survey Chart
No. 375.)
  Previous projects.-Adopted by acts of March 3, 1871, June 14,
1880, and July 25, 1912. The cost and expenditures on these projects
were $242,158.87, of which $157,224.41 was for new work and
$84,934.46 for maintenance. For further details see page 1778 of
Annual Report for 1915 and page 323, Annual Report for 1929.
  Existing project:--This provides for a channel, to be obtained by
diking and dredging, 12 feet deep and 100 feet wide in Washington
Canal, 1.1 miles, and 12 feet deep and generally 150 feet wide in
South River following cut-off no. 1 up to Old Bridge, 4.1 miles.
   1Exclusive of available funds.
     RIVERS AND HARBORS-SECOND             NEW YORK, N.      Y., DISTRICT     207

The tidal variation at the canal is 5.34 feet, and at Old Bridge, 4.57
feet. Irregular tidal fluctuations from 1 to 2 feet, respectively,
above or below the mean range takes place during high easterly or
westerly winds.
   The estimate of cost for new work, made in 1929, is $90,000, exclu-
sive of amounts expended on previous projects. The latest (1929)
approved estimate for annual cost of maintenance is $8,000.
   The existing project was adopted by the River and Harbor Act of
July 3, 1930 (H. Doc. No. 109, 71st Cong., 1st sess.). The latest
published map is in the project document.
   Local cooperation.-Fullycomplied with.
   Terminal facilities.-There is 1 publicly owned wharf at South
River, and 10 private wharves, some of which are open to public use.
These facilities seem adequate under existing conditions. (For
further details see Port Series No. 20, pts. II and III, Corps of
Engineers.)
   Operations and results during fscal year.--A survey was made
during the year with a view to determining whether maintenance
dredging was necessary. The total cost for the year was $1,065.58,
all for maintenance. The expenditures were $1,013.42.
   Condition at end of fiscal year.-Work on the section of the exist-
ing project to be done by the United States, extending from the
mouth of Washington Canal to the highway bridge at South River,
was completed in 1931, at a saving of $41,108 under the estimated
cost. The section from the highway bridge at South River upstream
to the head of the project has been completed, except at the extreme
upper end, by the State of New Jersey. The controlling depth on
June 30, 1934, at mean low water was 12 feet to the highway bridge
at South River; thence 11 feet to the Paragon Brick Co., except for
a shoal 500 feet long with a controlling depth of 5 feet, seven-tenths
of a mile above the Raritan River Railroad bridge; thence 8 feet to
the South River Sand Co.'s dock; and thence 3 feet to the upper end
of the project at Old Bridge.
   The total costs, excluding $364.73 contributed funds, which were
expended by the United States for new work, were $48,891.82 for
new work and $28,957.55 for maintenance, a total of $77,849.37. The
total expenditures, excluding $364.73 contributed funds, expended by
the United States, were $77,797.21.
   Proposed operations.--It is proposed to apply the funds unex-
pended June 30, 1934, amounting to $23,972.27, as follows:
Accounts payable June 30, 1934__--------------------------                 $52. 16
Maintenance:
    Dredging by contract to restore project dimensions at three areas
      between the railroad bridge at South River and the upper end
      of the project (July and August 1934) --------------------       15, 920.11
    Dredging to restore project dimensions by contract, where shoals
      occur periodically in the reaches of the river above the highway
      bridge at South River (May 1935) -----------------------          8, 000. 00

        Total cost--------------------------------------------          23, 972. 27
  The additional sum of $8,000 can be profitably expended during
the fiscal year 1936, in maintenance dredging to restore project di-
mensions in the sections of the channel that shoal periodically. The
work will be undertaken during the month of May 1936.
      91536---ENG 1934--14
208          REPORT           OF CHIEF OF ENGINEERS, U.                                S. ARMY,              1934

                                          Cost and financial summary

Cost of new work to June 30, 1934------------------------------                                              1$206, 116. 23
Cost of maintenance to June 30, 1934----------------------                                                     113, 892. 01

      Total cost of permanent work to June 30, 1934 ---                                           _------_       320, 008. 24
Minus accounts payable June 30, 1934 -------------                                                -----                52. 16

     Net total expenditures    --------                                                                          319, 956. 08
Unexpended balance June 30, 1934 _                                                                                23, 972.27

          Total amount appropriated to June 30, 1934---------------343, 928. 35

          Fiscal year ending June 30                          1930        1931           1932             1933           1934


Cost of new work_________---------------                                  $495.90    $48,4 395.. 92    .2
                                                                                                        6.9.              .
Cost of maintenance                    ------------   .-...           .                1, 429. 07     $26, 462. 90      $1, 065. 58

       Total cost-.        .-------------------------------                495. 90    49, 824. 99      26, 462. 90       1, 065. 58

Total expended ______....___________-____--___                             371. 34    49, 949. 55      26, 462. 90       1, 013. 42

Allotted. _________________---
                 -___                                 -$6, 200. 39    90, 218. 48 -29, 694. 27         16, 259. 58.     24, 985. 69


Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934.    ------------------------------------------- $9, 000. 00
Amount allotted from War Department Appropriation Act approved
Mar. 4, 1933        --------------------------------------    16, 000. 00

      Amount to be accounted for---------------------------                                                          25, 000.00
Deductions on account of revocation of allotment-- -------------                                                          14. 31

      Net amount to be accounted for------------------------   24, 985. 69
Gross amount expended    ------------------------------------- 1, 013. 42

      Balance unexpended June 30, 1934_--------------------        23, 972. 27
Outstanding liabilities June 30, 1934-----------------------------      52. 16

          Balance available June 30, 1934                            ------------------------ 23, 920. 11

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance
                            -
                                             2
                              - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
                                                                                                                      8, 000. 00

                                       9. KEYPORT HARBOR, N. J.

   Location.- This harbor lies at the mouth of Matawan Creek, on
the south side of Raritan Bay, about 9 miles west of Sandy Hook.
 (See U. S. Coast and Geodetic Survey Chart No. 369.)
   Existing project.-This provides for a channel about 1 mile long
from Raritan Bay to the steamboat dock at Keyport, the width to be
200 feet and the depth to be 8 feet at mean low water. The mean
range of tides is 4.9 feet. High easterly or westerly winds cause the
tides to fluctuate from 1 to 2 feet above or below the mean range.
   The estimate of cost for new work, made in 1883, was $40,475. The
latest (1917) approved estimate for annual cost of maintenance is
$5,000.
   The project was adopted by the River and Harbor Act approved
August 2, 1882 (H. Doc. No. 153, 42d Cong., 3d sess., and Annual
Report for 1873, p. 941). The latest published map is printed in the
Annual Report for 1905, page 1040.

  21In addition $364.73 was expended from contributed funds.
    Exclusive of available funds.
        RIVERS AND HARBORS-SECOND NEW YORK                                             N.    Y., DISTRICT      209
   Terminal facilities.-There are four privately owned wharves lo-
cated on Keyport Harbor. Only one of these is open to public use.
The terminal facilities seem adequate under existing conditions.
   Operations and results during fiscal year.-A contract for main-
tenance dredging from the 8-foot contour in Raritan Bay to the
vicinity of the steamboat dock, was commenced April 26 and
completed May 31, 1934.
   The total cost for the year was $20,647.90, all for maintenance.
The total expenditures were $20,601.62.
   Condition at end of fiscal year.-The project was completed in
1911. The controlling low-water depth on June 30, 1934, to the
upper steamboat wharf at Keyport was about 8 feet in a channel
practically of project width.
   The total costs were $40,475 for new work and $138,926.61 for
maintenance, a total of $179,401.61. The total expenditures were
 $179,355.33.
   Proposed operations.-It is proposed to apply the funds unex-
pended on June 30, 1934, amounting to $367.86, to settlement of ac-
counts payable on that date, and to maintenance contingencies.
    No work is proposed during the fiscal year 1935 and 1936, as it
is believed the restoration of project dimensions during the spring
of 1934 will insure a usable channel until the fiscal year 1937.
                                            Cost and financial swmaary
Cost of new work to June 30, 1934--------------------------- $40, 475. 00
Cost of maintenance to June 30, 1934------------------------ 138, 926. 61

     Total cost of permanent work to June 30, 1934-----------  179, 401.61
Minus accounts payable June 30, 1934----------------------------     46. 28

     Net total expenditures   -----------------------------    179, 355. 33
Unexpended balance June 30, 1934----- -------------------------     367. 86
           Total amount appropriated to June 30, 1934                                                         723. 19
                                                                                                        1--------------79,

           Fiscal year ending June 30                          1930        1931       1932       1933         1934

Cost of new work-----------------------------------------------------
Cost of maintenance------------------ $15, 119. 21                         $335. 30    $45. 49              $20, 647. 90
Total expended-------------------------                      5, 772. 36   9,682. 15     45.49     --         20, 601. 62
Allotted.----------------------------15,                        500.00------------------------     --        20, 969.48


Amount allotted from War Department Appropriation Act approved
  Mar. 4, 1933--       ------------------------------------       $21, 000. 00
Deductions on account of revocation of allotment-----------------       30. 52
      Net amount to be accounted for---------                                                            20, 969. 48
Gross amount expended     ----------------------------------                                             20, 601. 62
       Balance unexpended June 30, 1934------------------------                                               367. 86
Outstanding liabilities June 30, 1934-----------------------------                                            46. 28
           Balance available June 30, 1934------------------------.                                           321. 58
210    REPORT OF CHIEF OF ENGINEERS,       U.   S.   ARMY,   1934

                     10. MATAWAN CREEK, N. J.

   Location.-This creek is a small stream rising near Matawan, N. J.,
and flowing through marshes into Keyport Harbor. (See U. S.
Coast and Geodetic Chart No. 369.)
   Existing project.-This provides for a channel 4 feet deep at mean
low water and 100 feet wide to Winkson Creek, a distance of 1 mile,
thence for about 1 mile 75 feet wide to the New York & Long Branch
Railroad bridge at Matawan. The mean range of tides is 4.9 feet.
Strong easterly or westerly winds cause the tides to fluctuate from
1 to 2 feet above or below the mean range. The estimate of cost for
new work, made in 1881, is $33,120. The latest (1917) approved
estimate for annual cost of maintenance is $3,000.
   The project was adopted by the River and Harbor Act approved
March 3, 1881 (H. Doc. No. 45, 46th Cong., 3d sess., and Annual
Report for 1881, p. 720). The latest published map is printed in
House Document No. 43, Sixty-third Congress, first session.
   Terminal facilities.-There is one publicly owned bulkhead wharf
at Matawan in bad repair and unfit for use. There are eight small
private wharves and a boat basin with marine ways suitable for
small pleasure boats and yachts located on the creek. The termi-
nals are connected with highways and are adequate for existing
commerce.
   Operationsand results duri'ngfiscal year.-A contract for dredging
about 1,500 feet of the lower end of the project was commenced on
April 26 and completed on May 31, 1934.
   The total cost and expenditure for the year was $3,605.92, all for
maintenance.
   Condition at end of fiscal year.-The project is 90 percent com-
pleted. The project depth has been completed from the mouth to the
town dock at Matawan with the following widths: 90 to 100 feet
from the mouth to the first highway bridge; thence 80 feet wide to
Winkson Creek; and thence 60 to 70 feet wide to the town dock at
Matawan. The controlling depth at mean low water on June 30,
1934, was 8 feet from the mouth, 1,500 feet upstream; thence 5 feet
for a distance of 500 feet; and thence 1 foot to the upper end of the
project.
   There remains to be done to complete the project widening of the
channel from the mouth to the town dock at Matawan, and thence
construction of a channel of project dimensions to the railroad
bridge.
   The costs were $21,000 for new work and $73,964.09 for mainte-
nance, a total of $94,964.09.
   Proposed operations.-It is proposed to apply the funds unex-
pended on June 30, 1934, amounting to $394.08, to maintenance,
contingencies.
   No funds can be profitably expended during the fiscal year 1936,
as the maintenance work performed during June 1934 will insure
project dimensions over the section of the project now in use until
the fiscal year 1937.
        RIVERS AND HARBORS-SECOND                                    NEW YORK, N.                      Y., DISTRICT        211
                                       Cost and financial sumnmary

'Cost
4Cost
        of new work to June 30, 1934__
        of maintenance to June 30, 1934
                                                                                                                  $21, 000. 00
                                                                                                                       964. 09
                                                                                                                   7-----------------------------

         Total cost of permanent work to June 30, 1934---------------                                              94, 964. 09

Net total expenditures_---    - _____- --                                                     -___----94              94,964.09
Unexpended balance June 30, 1934__                                                                                      394. 08
         Total amount appropriated to June 30, 1934_____________                                                   95, 358. 17

         Fiscal year ending June 30                      1930             1931             1932            1933          1934

Cost of new work....----------------------------                                          ----------            ---
Cost of maintenance---._--- -                  _                     -----------------                 ------------     $3,605. 92
'Total expended.            ------------------------------------------------------------                                 3,605.92
Allotted .... -----------------------------------
                ___                                                              -       _-----------                   4, 000.00


Amount allotted from War Department Appropriation Act approved
  Mar. 4, 1933------------------------------------------------$4, 000. 00
Gross amount expended--------------                              3, 605.92

          Balance unexpended June 30, 1934____----------------------                                                    394.08

Amount (estimated)               required to be appropriated for completion of
    existing project 1-_______-                    ---------------                                                 12, 000. 00

                   11. SHOAL HARBOR AND COMPTON CREEK, N. J.

   Location.-Shoal Harbor is an indentation on the south shore of
Raritan and Sandy Hook Bays. Compton Creek is a small stream
rising on the west side of the Navesink Highlands and flowing
through the meadows into Shoal Harbor. (See U. S. Coast and
Geodetic Survey Chart No. 369.)
   Existing project.-This provides for a channel by dredging and
diking about two-thirds of a mile in length, connecting Compton
Creek with the 4-foot curve in Raritan Bay, the width to be 150
feet in the bay and 75 feet in and near the mouth of the creek, the
depth to be 4 feet at mean low water. The mean range of tides is
4.5 feet. Irregular fluctuations from 1 to 2 feet above or below the
mean range occur in the tides during heavy easterly or westerly
storms.
   The estimate of cost for new work, made in 1890, is $64,130. The
latest (1928) approved estimate for annual cost of maintenance is
$10,000.
   The project was adopted by the River and Harbor Act approved
September 19, 1890 (S. Doc. No. 80, 48th Cong., 1st sess., and Annual
Report for 1884, p. 770). The latest published map is printed in
House Document No. 58, Seventy-third Congress, first session.
   Recomnended nodifications of projeot.-It is recommended that
the project be modified by eliminating the proposed dike and reduc-
tion of width of channel in bay from 150 feet to 100 feet (H. Doc.
No. 467, 69th Cong., 1st sess.).
    'Exclusive     of available funds.
212    REPORT    OF CHIEF OF ENGINEERS,        U.   S.   ARMY,   1934

   Under date of May 23, 1933, the Chief of Engineers recommended
further improvement of Compton Creek, N. J., so as to provide a
channel 8 feet deep extending from deep water in Sandy Hook Bay
to the Main Street Bridge, with a width of 150 feet in the bay and
75 feet inside the mouth of the creek, and suitably widened at the
bend in the creek, all at an estimated cost of $44,000 with main-
tenance estimated at $5,000 annually in addition to that now re-
quired, subject to the conditions that work shall not be undertaken
until harbor lines have been established by the Secretary of War
along that portion of Compton Creek embraced in the proposed im-
provement, and subject to certain conditions of local cooperation
 (H. Doc. No. 58, 73d Cong., 1st sess.).
   Terminal facilities.-There are no public terminals located on this
waterway. There are 3 terminals suitable for barge traffic located
near the mouth of Compton Creek, 2 of which are open to the public
on equal terms and 2 of which are equipped with loading and un-
loading devices. Within the navigable section of the creek above the
project limit there are over 30 small terminals and 2 marine ways
suitable for small fishing boats.
   Operations and results during fiscal year.--A survey was made
during the year with a view to determining whether maintenance
dredging was necessary, and payment was made of part of the ex-
penses incurred by the first New York district for maintenance
dredging done in the prior fiscal year.
   The total cost for the year was $1,063.23, all for maintenance.
The expenditures were $2,063.23.
   Condition at end of fiscal year.--About 60 percent of the area to be
dredged under the project has been completed. The last new work
was done on the improvement in 1899. No dikes have been built.
The controlling depth into the creek on June 30, 1934, through the
improved channel-was about 7 feet at mean low water.
   Work remaining to be done to complete the project is dredging to,
widen the entrance channel from 100 to 150 feet and the construc-
tion of a rock-filled pile dike 3,200 feet long.
   The cost and expenditures have been $17,000 for new work and
$169,700.34 for maintenance, a total of $186,700.34.
   Proposed operations.-It is proposed to apply the funds unex-
pended on June 30, 1934, amounting to $12,290.48, in maintenance
dredging by contract to restore project dimensions in the completed
portion of the project during April 1935.
   The sum of $10,000 can be profitably expended during the fiscal
year 1936 to restore project dimensions throughout the completed
section of the project. The work will be undertaken in April 1936.
   The interests of commerce do not warrant further new work under
the project at the present time.
                        Cost and financial summary
Cost of new work to June 30, 1934-_____---- _--------   ------     $17, 000. 00
Cost of maintenance to June 30, 1934---------------------------    169, 700. 34

      Total cost of permanent work to June 30, 1934------------186,     700. 34

     Net total expenditures- _-     -                                 6, 700. 34
                                                                    18-------_----
Unexpended balance June 30, 1934-------------------------            12, 290. 48
      Total amount appropriated to June 30, 1934 --------------    198, 990. 82
        RIVERS AND HARBORS-SECOND NEW YORK, N.                           Y., DISTRICT               213


           Fiscal year ending June 30     1930     1931          1932                1933         1934


Cost of new work
Cost of maintenance                              $7, 585. 07   $3, 844. 59   $11, 568. 74        $1, 063. 23
Total expended-                                     355. 24    11, 074.42       10, 568. 74       2, 063. 23
Allotted                  ----------             13, 498. 85    2,069. 19       11, 931. 13      12, 991. 3'


Balance unexpended July 1, 1933-___                             $1, 362. 39
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934-......-..             $12,      00
                                                           .00.
Amount allotted from War Department Appropri ntion
  Act approved July 14, 1932-                       10, 000. 00
Amount allotted from War Department Appropriation
Ac. approved Mar. 4, 1933------------------------  33, 000. 00
                                                                                     -        55, 000. 00

Amount to be accounted for..--                                                  __            56, 362. 39
Deductions on account of revocation of allotment-                        ----            _    42,008. 68

      Net amount to be accounted for .            -----.                                      14, 353. 71
Gross amount expended_-------------------__--                                                  2, 063. 23

           Balance unexpended June 30, 1934__--                                               12, 290. 48

Amount (estimated)   required to be appropriated for completion of
                 - -- --
  existing project 1           ___________________________                                    47, 130. 00
Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1                  _--------------------- 10, 000. 00

                                12. SHREWSBURY RIVER, N. J.

   Location.-This river is mainly a large tidal basin in the eastern
part of New Jersey, the outlet being at the southeast end of Sandy
Hook Bay, about 4 miles south from the point of Sandy Hook. (See
U. S. Coast and Geodetic Survey Chart No. 543.)
   Previous projects.-Adopted by acts of August 30, 1852, March 3,
1871, June 3, 1879, and modified in 1883 and 1887. The cost and
expenditures have been $220 893.95 for new work and $286,606.05
for maintenance, a total of $507,500. For further details see page
1778 of Annual Report for 1915 and page 373 of Annual Report for
1918.
   Existing project.--This provides for dredging a channel 6 feet
deep at mean low water 300 feet wide from the mouth to Island
Beach, 1.4 miles; thence 200 feet wide to the junction of the two
branches, 1.5 miles; thence 150 feet wide to Red Bank and Branch-
port, 5.5 and 6.1 miles in the North Branch and South Branch, respec-
tively. The mean range of tides on the outer bar is 5 feet; at High-
lands Bridge, 3 feet; at Sea Bright, 1.3 feet; at Branchport, 0.86 foot;
and at Oceanic, 2.5 feet. High easterly or westerly winds cause
irregular tidal fluctuations from 1 to 2 feet above or below the mean
range.
   The estimate of cost for new work, revised in 1923, is $146,000,
exclusive of amounts expended on previous projects. The latest
 (1912) approved estimate for annual cost of maintenance is $10,000
during construction and $20,000 thereafter.
  1   Exclusive of available funds.
214      REPO'RT OF CHIEF OF ENGINEERS,            U.   S.   ARMY,   1934


   The existing project was adopted by the River and Harbor Act of
March 2, 1919 (H. Doc. No. 1296, 62d Cong., 3d sess.). The latest
published map is in House Document No. 157, Seventy-first Con-
gress, second session.
   Recommnended modifications of project. Under date of December
12, 1929, the Chief of Engineers recommended modification of the
existing project so as to provide for a channel 12 feet deep and 300
feet wide, following the westerly shore to a point 600 feet south
of the Highlands Bridge, at an estimated cost of $205,000, with
$10,000 annually for maintenance, subject to certain conditions of
local cooperation. (H. Doc. No. 157, 71st Cong., 2d sess.)
   Terminal facilities.-There are 4 publicly owned wharves and 17
privately owned wharves used for commercial purposes, many of
which are open to general public use on equal terms. The terminals
seem to provide adequately for the demands of existing commerce.
   Operationsand results during fiscal year.-Surveys were made dur-
ing the year with a view to determining whether maintenance dredg-
ing was necessary.
   The total cost for the year was $1,570.73, all for maintenance. The
expenditures were $1,537.34.
   Condition at end' of fiscal year.-Work under the project is about
66 percent completed. Project dimensions were obtained before the
adoption of the existing project in the main stem and in the lower
parts of the, two branches under the previous project. New work has
since been done in the south branch between the steamboat wharf
at Sea Bright and the upper end of the project at Branchport. The
controlling depths on June 30, 1934, at mean low water over the bars
in the river were about 3 feet. There yet remains to be done to com-
plete the project, dredging in the upper end of the north branch at
the locality of the steamboat dock at Red Banks, N. J., and at the
locality of the highway bridge at Oceanic.
   The total costs were $96,304.66 for new work and $158,554.80 for
maintenance, a total of $254,859.46. The total expenditures were
$254,826.07.
   Proposed operations.-It is proposed to apply the funds unex-
pended June 30, 1934, amounting to $29,931.19, as follows:
Accounts payable June 30, 1934---------------------                        $33. 39
Maintenance :
    Dredging with Government plant to restore project dimensions
      at the mouth and at shoals above the highway bridge at High-
      lands and in Reeves Channel opposite Sea Bright September
      1934) ---------------------------------------------------- 7, 500. 00
    Dredging by contract to restore project dimensions in the author-
      ized channel where shoals occur periodically (March and April
      1935) --------------------------------------                    22, 397. 80

      Total---     --------------------------------------------         29, 931. 19
  The sum of $10,000 can be profitably expended during the fiscal
year 1936 in maintenance dredging to restore project dimensions
where shoals occur each season. The work will be undertaken in
April 1936.
   The interests of commerce do not warrant further new work under
the project at the present time.
         RIVERS AND HARBORS-SECOND NEW YORK, N. Y., DISTRICT 215

                                         Cost and financial summary
Cost of new work to June 30, 1934-----------------------------                                                  $317, 198. 61
Cost of maintenance to June 30, 1934---------------------------                                                  445, 160. 85

      Total cost of permanent work to June 30, 1934 -----------                                                   762, 359. 46
Minus accounts payable June 30, 1934                                                                                   33. 39

      Net total expenditures_-----                                                                                762, 326. 07
Unexpended balance June 30', 1934 __-                              --             ------                          29, 931. 19

           Total amount appropriated to June 30, 1934----------------792, 257. 2:6

          Fiscal year ending June 30                     1930              1931              1932         1933             1934

Cost of new work---
Cost of maintenance------------------                $14, 673. 00    $2, 405. 73           $7, 725.65          35
                                                                                                        $9, 784.         $1, 570. 73
Total expended-----------------------                  1, 146. 39        15, 932. 34        7,707. 65    9, 802. 35        1,537. 34
Allotted----------------------------                  14, 673. 00        11, 007. 65   -            _    8, 908. 08       31, 468. 53


Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934---------------------------------------------    $16,000. 00
Amount allotted from War Department Appropriation Act approved
Mar. 4, 1933------------------------------------------         20, 000. 00
      Amount to be accounted for-------------------------------                                                       36, 000. 00
Deductions on account of revocation of allotment -          __                                                         4,531. 47

      Net amount to be accounted for-------------------------                                                         31, 468. 53
Gross amount expended-----------------------------------                                                               1, 537. 34

      Balance unexpended June 30, 1934-------------------------                                                       29, 931. 19
Outstanding liabilities June 30, 1934-----------------------------                                                         33. 39

          Balance available June 30, 1934--------------------------                                                   29, 897. 80

Amount (estimated) required to be appropriated for completion of
existing project 1- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -            50, 000. 00

Amount that can be profitably expended in fiscal year ending
                                1- - - - - - - - - - - - - - - - - -
June 30, 1936, for maintenance                               _                                                       10, 000. 00

                                    13. MANASQUAN RIVER, N. J.

   Location.--This is a small stream located in the eastern part of
New Jersey, rising near Freehold and flowing to the Atlantic Ocean,
about 26 miles south of Sandy Hook. (See U. S. Coast and Geodetic
Survey Map No. 1216.)
   Previous projects.-Adopted by act of March 3, 1879. The cost
and expenditure under previous projects have been $39,000 for new
work and $2,054.11 for maintenance, a total of $41,054.11. (For
further details see Annual Report for 1909, p. 186.)
   Existing project.-This provides for opening of Manasquan Inlet
and the provision of works designed to secure a channel at least 8
feet deep. The mean tidal range in the ocean opposite the inlet is
3.8 feet. The mean tidal range in the easterly lagoon is about 2 feet.
   ' Exclusive of available funds.
216     REPORT OF CHIEF OF ENGINEERS,               U.   S. ARMY,     19 34


   The estimate of cost for new work, made in 1928, is $600,000,
exclusive of amount expended on previous projects, of which $300,-
000 is to be contributed by. local interests. The latest (1928) ap-
proved estimate for annual cost of maintenance is $15,000.
    The existing project was authorized by the River and Harbor Act
approved July 3, 1930 (H. Doc. No. 482, 70th Cong., 2d sess.).
This document contains the latest published map.
   Local cooperation.-Fully complied with.
   Terminal facilities.-No docks, wharves, or terminals suitable for
commercial purposes have been established. There are many small
boat landings.
    Operations and results during fiscal year.-A survey was made
during the year with a view to determining whether maintenance
work was necessary, and settlement was made of outstanding obliga-
tions pertaining to new work completed in the previous fiscal year.
    The total costs for the year were $293 for new work and $273.56
for maintenance, a total of $566.56. Thei total expenditures were
$2,401.04.
    Condition at end of fscal year.-Work under the existing project is
about 95 percent completed. Two jetties of an aggregate length of
:2,260 feet are completed, the north jetty being 1,230 feet long and
the south jetty 1,030 feet long. A section of steel bulkhead 300 feet
long at the inshore end of south jetty is completed, and a channel
connecting with the State of New Jersey channel at a point 700 feet
easterly of the New York & Long Branch Railroad bridge has been
dredged easterly for a distance of 4,225 feet, 300 feet wide and 8 feet
deep, and thence narrowing to 250 feet, with depth of 10 feet to the
10-foot curve in the ocean, a distance of about 875 feet. The control-
ling depth on June 30, 1934, was 8 feet at mean low water, except for
a few scattered shoals with depths thereon of 6 feet from the ocean
to a point 700 feet easterly of the railroad bridge. There remains
to be done to complete the project the construction of a bulkhead
between the inshore end of the north jetty and the inshore end of
the groin, about 250 feet northerly thereof, and raising of the north
jetty at its inner end.
    The total cost of the existing project, excluding $300,000 con-
tributed funds, which were expended for new work, was $288,138.51,
of which $268,083.61 was for new work and $20,054.90 was for main-
tenance. Total expenditures, excluding $300,000 contributed funds,
were $288,060.43.
   Proposed operations.-It is proposed to apply the funds unex-
pended on June 30, 1934, amounting to $30,448.35, as follows:
Accounts payable__----------------------------------------------         $78. 08
Maintenance :
    Constructing by contract an extension to an existing steel sheet
      pile groin, a steel sheet pile bulkhead and repairs to the in-
      shore end of the north jetty (July to October 1934)         __ 12, 479. 39
    Dredging by contract to restore project dimensions where shoals
      occur in the channel (May and June 1935) ------------------- 17, 890.88

      Total__--    ------------------------------------------------           30, 448.35
         RIVERS AND HARBORS-SECOND NEW YORK, N. Y., DISTRICT                                                                  217
  The sum of $15,000 can be profitably expended during the fiscal
year 1936, in maintenance repairs to the north and south jetties.
The work will be undertaken during September and October 1935.
                                      Cost and financial summnary
Cost of new work to June 30, 1934 ----------------------------- $307, 083. 61
Cost of maintenance to June 30, 1934 --------------------------   22, 109. 01
      Total cost of permanent work to June 30, 1934 __---                                                    __     329, 192. 62
Minus accounts payable June 30, 1934 --------------------                                                            --- 78. 08

      Net total expenditures____--- _____------------                                                               329, 114. 54
Unexpended balance June 30, 1934________-----------------                                                            30, 448. 35

          Total amount appropriated to June 30, 1934_                                __----                    . 359, 562. 89

          Fiscal year ending June 30                  1930               1931             1932               1933          1934


Cost of new work .________________-
                      -                   $818. 47 $198, 182. 35                     $17, 166. 42       $51, 623. 37        $293. 00
Cost of maintenance_- ----------------------
                                    __   _           19, 781. 34                    _________-------------                   273. 56

       Total cost ----------------------               818. 47       217, 963. 69      17, 166. 42       51, 623. 37         566.56

Total expended_--          .-----            ----
                                             _-----------756.   45   190, 193. 02     44, 961. 46        49, 748. 46       2, 401. 04

Allotted_ ---   ...--.--       _______-------_    14, 375. 00        220, 700. 00     11, 000. 00        58, 436. 21      13, 997. 57


Balance unexpended July 1, 1933------------------------------      $18, 851. 82
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934_-__-------  ____ __ -     $15, 000. 00
Amount allotted from War Department Appropriation
Act approved July 14, 1932-__---__-__--      _____--   9,000. 00
                                                                    24, 000. 00
     Amount to be accounted for______________--            _________ 42, 851. 82
Deductions on account of revocation of allotment_ ...-----             10, 002. 43
                                                                    -___-

      Net amount to be accounted for __-    _____--____---                                                             32, 849. 39
Gross amount expended_     ---------------------------------                                                            2,401. 04
      Balance unexpended June 30, 1934_ .....      ___
                                                     -                                         --- ______              30, 448. 35
Outstanding liabilities June 30, 1934 ________________                                              78. 08
Amount covered by uncompleted contracts _-____---__--                                          11, 144. 56
                                                                                                                       11, 222. 64
         Balance available June 30, 1934-__________________
                                          --                                                                    _      19, 225. 71
Amount (estimated) required to be appropriated for completion of
  existing project 2_----------------                                                                                  32, 000.00

Amount that can be profitably expended in fiscal year ending June
  30, 1936, for maintenance 2-------------_                                                                            15, 000. 00

   14. EXAMINATIONS,' SURVEYS, AND CONTINGENCIES (GENERAL)

   The cost of the work during the year amounted to $46,537.98; the
expenditures were $46,225.35. The balance unexpended at the end
of the fiscal year, $34,437.53, will be applied as needed during the
fiscal year 1935 to payment of expenses to be incurred in connection
with the above items. The additional sum of $17,000 can be profitably
expended during the fiscal year ending June 30, 1936.
1Exclusive of $300,000 expended from contributed funds.
2 Exclusive of available funds.
218       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                         1934

                                     Cost and financia summary

Cost of new work to June 30, 1934________-________-------------------
                                            -----------
Cost of maintenance to June 30, 1934______________         $315, 939. 05

     Total cost of permanent work to, June 30, 1934------------                                                   315, 939. 05
Minus accounts payable June 30, 1934---------------------------                                                        690. 25,

      Net total expenditures----------------------------------- 315, 248. 80
Unexpended balance June 30, 1934------------------------------34, 437. 53:
        Total amount appropriated to June 30, 1934 _______-___                                                     349, 686. 33

        Fiscal year ending June 30                   1930             1931              1932              1933              1934

Cost of new work-----
Cost of maintenance_                             $18, 204. 42     $29, 392. 42     $89, 772. 19 $113, 395. 87            $46, 537. 98

Total expended          .        -                18, 248. 51      31, 395. 12       89, 204. 35     110, 858. 23          46, 225. 35
Allotted.---_                                      13, 000. 00
                                          -__-__----_              41, 000. 00       69, 700. 00     130, 628. 79          60, 357. 54-


Balance unexpended July 1, 1933        _ _  _                        $20, 305. 34
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934___      ___       -------- $17, 000. 00
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933_ _--- --    _--   -----      45, 000. 00
                                                                      62, 000. 00
     Amount to be accounted for                                                                                             305. 34
                                                                                                                       8----------------------------
Deductions on account of revocation of allotment                                                                          , 642. 46
                                                                                                                        1-----------------

       Net amount to be accounted for---------------------                                                             80, 662. 88
Gross amount expended_____________-____________                                                49, 743. 99
Less :
Reimbursements collected __------------------ $3, 510. 14
    Receipts from sales --------------------               8. 50
                                                                                                3, 518. 64
                                                                                                                   .46, 225.35

        Balance unexpended June 30, 1934___________-------                                                             34,437. 53
Outstanding liabilities June 30, 1934_______________------------                                                           821. 03
        Balance available June 30, 1934-------------------------_                                                      33, 616. 50

Amount that can be profitably expended in fiscal year ending June
                           -------------------------------
30, 1936, for maintenance 1                                    _                                                      17, 000. 00
                 15. Other projects for which no, estimates are submitted
           [Commercial statistics for these projects are given in pt. 2 of report]

                                                                      For last Cost and expenditures
                                                                       full re-   to June 30, 1934                      Estimated
                        Name of project                               port see                                          amount. re.-
                                                                      annual                                             quired to
                                                                       report New work Mainte-                           complete
                                                                        for-                            nance


1. Cheesequake Creek, N. J.1.---        -                 _--------        1928            $40, 000 $24, 956. 69             $50, 000
2. Rahway River, N. J.2        .............                               1895
                                                            ..----------------------------  37, 000------------.....          29, 000

   1 Channel adequate for commerce.
   2 Project recommended for abandonment in 1926.           Further improvement recommended in H. Doc. No.
63, 73d Cong., 1st sess.

  'Exclusive of available funds.
            RIVERS AND HARBORS-PHILADELPHIA,                                     PA., DISTRICT              219

                                                                DStatus resolutions
         of reports called for by river and harbor acts and committee


        Locality                                         Transmitted                               Recommenda-
                               Authorization act         to Congress
                                                         to Congress          Document no.             tion
                                                                                                       to

Manasquan River, N. J_ Senate committee reso-
                         lution, Apr. 27, 1934.
New York and New Jer- Rivers and Harbors
sey Channels, Sandy     Act, July 3, 1930.
Hook, N. J.; lower
New York Bay, Rari-
tan Bay, Arthur Kill,
Staten Island Sound,
Kill Van Kull, and
Shooters Island.
New York Bay-Dela- ....do----..-------          Jan. 10, 1934              H. 219, 73d Cong., 2d   Favorable.
ware River section,                                                         sess.
Intracoastal   Water-
way.
    Do ------------------    Rivers and Harbors
                               Committee resolu-
                              tion, Mar. 29, 1934.
Rahway River, N. J    -_     Rivers and Harbors
                               Committee resolu-
                              tion, Feb. 6, 1934.
Raritan River, N. J-----     Rivers and Harbors          Mar. 20, 1934                             Unfavorable.
                               Committee resolu-
                               tion, Oct. 13, 1932.
     Do----------------      Rivers and Harbors
                               Committee resolu-
                               tion, Apr. 27, 1934.
Shark River, N. J ...-----   Rivers and Harbors          Jan.   16, 1934                              Do.
                               Committee resolu-
                               tion, Dec. 14, 1932.                                                                     i!::":
                                                                                                                      .it    til;-




Shrewsbury River, N. J_ ---- do--------------.-.                                                                       i    flit     F;'iii::




Smith Creek, N. J......- River and Harbor                Mar.    3,1934
                                                                                                                                                         t.r


                                                                                                      Do.                   7



                                                                                                                                     Irtty      : t:;



                           Act Mar. 3, 1925.
                                                                                                                                i:
                                                                                                                          ii~itit
                                                                                                                      itill




                                                                                                                           ytt       ";::ii         r:    ,iiir




   IMPROVEMENT OF RIVERS AND HARBORS IN THE
           PHILADELPHIA, PA., DISTRICT

   This district includes the watershed drained by the Delaware and
Schuylkill Rivers, embracing a small area in southeastern New York,
the eastern part of Pennsylvania, the shore lines and tributaries of
Delaware River and Bay, and the streams, bays, and inlets along the
Atlantic coast from Bayhead, N. J., at the head of Barnegat Bay
on the north to the Delaware-Maryland State line on the south.
   District engineer: Col. Earl I. Brown, Corps of Engineers, to
December 2, 1933, and Col. J. A. Woodruff, Corps of Engineers,
since that date.
   Division engineer: Col. G. M. Hoffman, Corps of Engineers.
                                              IMPROVEMENTS

                                                Page                                                        Page
1. Delaware River bet ween                                     7. Operating and care of in-
      Philadelphia, P a., an d                                       land waterway from Del-
      Trenton, N. J_____------                     220               aware River to Chesa-
2. Delaware River, Pa., N. J.,                                     peake Bay, Del. and Md_                     247
      and Del., Philadelphia,                                   8. Smyrna River, Del_________                   248
      Pa., to the sea__-------                     226        9. Little River, Del_________                     250
3. Delaware River at Camden,                                10. St. Jones River, Del ________                  251
      N. J ______-                                 234       11. Murderkill River, Del _____                    253
  4. Schuylkill River, Pa ..--..                   236       12. Mispillion River, Del____ __                   254
5. Wilmington Harbor, Del___                      239       13. Broadkill River, Del ______                    256
6. Inland waterway from Dela-                               14. Inland waterway from Chin-
      ware River to Chesapeake                                                    Y
                                                                   coteague Bay, Va.,  to Del-
       Bay, Del. and Md________                    242             aware Bay, Del__________                     257
 220       REPORT    OF   CHIEF OF    ENGINEERS,     U. S.   ARMY,   1934

                             IMPROVEMENTS-continued
                                     Page                                      Page
15.   Cooper River, N.J ...----.     259   21. Cold Spring Inlet, N. J_----   268
16.
17.
18.
                          --..
       Woodbury Creek, N. J------
       Mantua Creek, N. J
       Salem River, N. J
                                      260
                                      261
                                      262
                                            22. Absecon Creek, N. J--------
                                            23. Examinations, surveys, and
                                                  contingencies (general) __
                                                                               270

                                                                                271
19.   Cohansey River, N. J------     265   24. Other projects for which no
20.   Maurice River, N. J-------.    266        "estimates are submitted__    272

        1. DELAWARE       RIVER BETWEEN PHILADELPHIA, PA., AND
                                TRENTON, N. J.

    Location.-This river has its source in southeastern New York,
flows in a general southerly direction, forming the boundary line
between the States of New York and New Jersey on the east and
Pennsylvania and Delaware on the west, and empties into Delaware
Bay. (See U. S. Coast and Geodetic Survey Charts Nos. 1218, 294,,
295, and 296.)
    Previous projects.-Adopted by acts of June .10, 1872; March 3,
1875; June 14, 1880; July 5, 1884; August 17, 1894; March 2, 1907;
June 25, 1910; July 25, 1912; and June 5, 1920. The total cost and
expenditures were $1,250,575.87, of which $990,143.30 was for new
work and $260,432.57 was for maintenance. For further details see
page 1778 of the Annual Report for 1915 and page 311 of the Annual
Report for 1924.
    Existing project.-This provides for a channel 28 feet deep at
mean low water and 300 feet wide from Allegheny Avenue, Phila-
  delphia, Pa., to the Delair Bridge of the Pennsylvania Railroad Co.;
thence 20 feet deep at mean low water and generally 200 feet wide
to Landing Street, Trenton, N. J., or to such point below as may be
selected for the public terminals. Above Delair the project provides
for widening the channel at curves to 250 feet and to 300 feet for
a distance of 500 feet above and 500 feet below the railroad bridge
at Biles Island, with a turning basin at the upper end 1,700 feet long
and 400 feet wide; and for maintaining the channel dredged under
the previous project to a depth of 12 feet at mean low water and a
width of 200 feet from the upper end of the 20-foot channel to the
Pennsylvania Railroad bridge at Ferry Street, Trenton.
    The total length of the improvement is about 30.5 miles, and the
distance from the lower end to Liston Point, the accepted point of
division between Delaware River and Delaware Bay, is about 55
miles. The mean range of tide at Philadelphia is 5.2 feet and at
Trenton 4.6 feet. The spring range is from 0.3 to 0.5 foot greater.
Freshets, which occur usually during February and March, attain
a height in the vicinity of Trenton of 9 to 15 feet above mean low
water, with a velocity of about 6 miles per hour. Freshets may
also occur at other seasons of the year, especially during the autumn
months. Navigation is usually suspended during the winter months
on account of the formation of ice in the river.
   The estimate of cost for new work revised in 1931 is $1,655,000,
exclusive of amounts expended on previous projects, of which $15,000
was contributed by local interests. The latest (1930) approved
estimate for annual cost of maintenance is $60,000.
        RIVERS AND HARBORS-PHILADELPHIA,         PA.,   DISTRICT   221
   The existing project was adopted by the River and Harbor Act
of March 3, 1925 (H. Doc. No. 228, 68th Cong., 1st sess.), which pro-
vided for a depth of 20 feet, and modified by the River and Harbor
Act of July 3, 1930 (Rivers and Harbors Committee Document No.
3, 71st Cong., 1st sess.), to provide for deepening the channel in
Philadelphia Harbor to 28 feet. The latest published maps are in
the Annual Report for 1914, page 1804, and the last-mentioned
document.
   Supplementing the work authorized by Congress the commence-
ment of the deepening of the channel to 25 feet as recommended
by the Chief of Engineers in Rivers and Harbors Committee Docu-
ment No. 11, Seventy-third Congress, first session, has been included
in the Public Works program under the National Industrial Recov-
ery Act.
   Recommended modifications of project.-Under date of May 26,
1933, the Chief of Engineers recommended modification of the exist-
ing project so as to provide for a channel 25 feet deep and 300 feet
wide, from Delair Bridge to the upper end of the municipal termi-
nal at Lamberton Street, Trenton, suitably widened at the bends,
with a turning basin at the upper end 1,700 feet long and 500 feet
wide; all at an estimated cost of $3,828,900, with $65,000 annually for
maintenance in addition to that now required, subject to certain con-
ditions of local cooperation (Rivers and Harbors Committee Doc.
No. 11, 73d Cong., 1st sess.). (Partially included in Public Works
program.)
   Local cooperation.-The work included in the Public Works pro-
gram is subject to the provision that local interests furnish suitable
spoil-disposal areas. All prior requirements have been complied
with.
   Terminal facilities.-The facilities are considered adequate for
existing commerce. (For further details see Port Series No. 4, Corps
of Engineers, pt. I, revised 1932.)
            OPERATIONS   AND RESULTS DURING FISCAL      YEAR


   Project adopted by Congress.-Maintenance dredging of the 20-
foot channel by the U. S. dredge Huston, in progress at the beginning
of the year, was completed November 15, 1933. Additional main-
tenance dredging by the U. S. dredge Alabama was commenced
March 29 and completed April 30, 1934. Approximately 688,469
cubic yards were removed from the channel between Edgewater and
Trenton ranges and deposited along the Pennsylvania and New
Jersey shores at a cost of $109,868.53 for maintenance.
   The cost of operating the automatic tide gages at Trenton, Bor-
dentown, Florence, Burlington, and Torresdale was $2,239.70 for
maintenance.
   Surveys and channel examinations performed by Government
plant and hired labor amounted to $11,032.22 for maintenance.
   The total cost of work during the year was $123,140.45, all for
maintenance. Total expenditures were $129,180.93.
   Project authorized by Federal Emergency Administration of Pub-
lic Works.-Contract for dredging with Public Works funds between
222     REPORT OF    CHIEF OF ENGINEERS,     U.   S.   ARMY,   1934


Delair, N. J., and Edgewater Park, N. J., commenced October 11,
1933, and was completed June 28, 1934. Approximately 2,490,881
cubic yards were removed at a cost of $1,016,355.32 for new work.
Total expenditures were $868,768.15.
  The total cost, all funds, was $1,139,495.77-$1,016,355.32 for new
work and $123,140.45 for maintenance. The total expenditures were
$997,949.08.
                   CONDITION AT END OF FISCAL YEAR


   Project adopted by Congress.-The existing project as authorized
by Congress was completed in 1932 at a saving of $55,739.72 under
the estimated cost. The dike at Mud Island provided for in the
12-foot channel project and included in the existing project has not
been built, and its construction will probably never be required.
   The latest examinations (March-May 1934) show depths less than
the project depth on or near the center line of the channel on the
following ranges: Devlin, 19.6 feet; Church, 19.7 feet; Florence, 19.7
feet; Kinkora, 19.3 feet; Newbold, 19.8 feet; Whitehill, 19.6 feet;
Duck Island, 18.6 feet. The minimum center-line depth on the 12-
foot channel from the marine terminal to Ferry Street, Trenton,
N. J., is 9.6 feet.
   The total cost of the project to June 30, 1934, excluding $15,000
contributed funds which were expended for new work, was $1,752,-
432.32, of which $1,584,260.28 was for new work and $168,172.04 for
maintenance. Total expenditures have been $1,752,218.31, exclusive
of $15,000 expended from contributed funds.
   Project authorized by FederalEmergency Administration of Pub-
lic Works.-Under supplementary work included in the Public
Works program the deepening of the channel to 25 feet has been
completed from the Pennsylvania Railroad bridge at Delair, N. J.,
to the upper end of Edgewater range, about 1 mile below the Bur-
lington-Bristol Bridge. This portion of the channel, having a length
of about 12 miles, now has a depth of 25 feet at mean low water and
a width of 300 feet, except on Mud Island range, where rock shoals
uncovered by dredging obstruct the east half, and part of the west
half of the 25-foot channel for a distance of about 3,500 feet, opposite
Delanco, N. J. The least depth over the rock is 18 feet at mean low
water, about 130 feet east of the center line, and the minimum width
of clear channel 25 feet deep through the rock area is about 100 feet.
The total cost of the work done with Public Works funds to June
30, 1934, was $1,016,355.32, all of which was for new work. Total
expenditures were $868,768.15.
   The work remaining to be done to complete the deepening of the
channel to 25 feet includes the dredging of about 6,800,000 cubic
yards between the lower end of Devlin range, below Burlington,
N. J., and the Trenton marine terminal, the removal of about 11,-
600 cubic yards of ledge rock and 7,000 cubic yards of other material
on Mud Island range, opposite Delanco, N. J., and the removal of ad-
ditional rock, if found, on Whitehill and Duck Island ranges.
         RIVERS AND HARBORS-PHILADELPHIA,                                PA.,    DISTRICT           223

  The total cost of the improvement, all funds, to June 30, 1934,
was $2,768,787.64, of which $2,600,615.60 was for new work and
$168,172.04 was for maintenance. The total expenditures were
$2,620,986.46. In addition $15,000 was expended from contributed
funds for new work.
  Proposed operations.-It is proposed to apply the funds unex-
pended and accounts receivable, on June 30, 1934, amounting to $71,-
172.70, as follows:
Accounts payable June 30, 1934_-----------------_-----                                          $215. 01
Maintenance:
    Maintenance dredging in 28-foot and 20-foot chan-
      nels, by contract, between September 1934 and
      June 1935--_____----- ----------            - -$68,                          000.00
    Surveys and operation of tide gages throughout
      the year-----------------------------------                               2, 957. 69
                                                                                              70, 957. 69
       Total      --------------------------------------------                                71, 172. 70
  It is proposed to apply the unexpended balance of Public Works
funds, in the amount of $186,231.85, together with an allotment of
$750,000 received during August 1934, as follows:
Accounts payable June 30, 1934 ._______-__......-___                 $147, 587. 17
New work:
    Rock removal, by contract, on Mud Island range_ $250, 000. 00
    Dredging 25-foot channel from Edgewater Park,
     N. J., to a point above Bristol, Pa., by contract_ 538, 644. 68
                                                                      788, 644. 68
       Total -----------------                     -------------------------                 936, 231. 85
  The proposed excavation under new work conducted with Public
Works funds will complete the 25-foot channel to Bristol, Pa. The
maintenance dredging will restore the 20-foot depth provided under
the former project, insuring free movement of traffic to Trenton,
pending completion of the deeper channel.
  The sum of $3,225,000 can be profitably expended during the fiscal
year 1936, as follows:
New work :
   Dredging 25-foot channel from Bristol,                        Pa.,   to
     Trenton, N. J., by contract____-__----------                            $2, 950, 000
    Removal of ledge rock, if found, between Borden-
     town and Trenton, by contract------------------                            200, 000
                                                                                             $3, 150, 000
Maintenance:
    Maintenance dredging, by contract, in 28-foot and
      25-foot channels (about September-November
      1935) ---------------------------------------                              70,000
    Channel examinations and maintenance                         of tide
     gages     ___-----------------                                                5, 000
                                                                                                  75, 000

         Total for all work__                                                                 3, 225, 000
  The proposed excavation under new work will complete the 25-foot
channel to Trenton, N. J.



      91536-ENG 1934--15
224         REPORT        OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

                                       Cost and finanoia summary
                                MAINTENANCE AND IMPROVEMEINT                           FUNDS

Cost of new work to June 30, 1934___                                                   _              -              $2, 574, 403. 58
Cost of maintenance to June 30, 1934 __________                                     _______-                             428, 604. 61

      Total cost of permanent work to June 30, 1934----------    3, 003, 008. 19
Plus accounts receivable June 30, 1934_.. ____..-              -___
                                                            -_____         1. 00

      Gross total costs to June 30, 1934                           ___-----            -__- -- ___                    3, 003, 009. 19
Minus accounts payable June 30, 1934_-                                    --
                                                                     _____-                 --
                                                                                          ____   _                            215.01

     Net total expenditures__-         ___---_____-                                                                   3, 002, 794. 18
Unexpended balance June 30, 1934____ -    -    - __ --                                     ____-----                    -71, 171. 70

         Total amount appropriated to June 30, 1934------------                                                       3, 073, 965. 88

   Fiscal year ending June 30              1930                1931                1932                     1933              1934


Cost of new work .__--...              -..$20, 626. 54   $455, 981. 25 $1, 094, 173. 84                $13, 478. 65                  ---
Cost of maintenance .-.--.--.              56, 572. 72      5, 971. 14      16, 082. 20                 22, 978. 25         $123, 140. 45
      Total cost   _----------------      77, 199. 26        461, 952. 39    1, 110, 256. 04               36, 456. 90       123, 140. 45
Total expended-----------------           80, 420. 08        453, 199. 85    1, 118, 207. 22               35, 345. 36       129, 180. 93
                  _
Allotted-------------------      __    - 500, 000. 00        890, 000. 00        210, 230. 13              43, 000. 00       180, 000. 00


Balance unexpended July 1, 1933                                                                                          $20, 352. 63
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934------------------------- $70,000
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933____      -_____ -_______ 110, 000
                                                                                                                         180, 000. 00
      Amount to be accounted for _________--______-----                                                                  200, 352. 63
Gross amount expended __     ________           ______-____-                                           -__       _-      129, 180. 93
      Balance unexpended June 30, 1934_ ----------------                                                                  71, 171. 70
Outstanding liabilities June 30, 1934_11__         ___1________                                                               260. 01

      Balance available June 30, 1934_..----------------                                                                 - 70, 911. 69
Accounts receivable June 30, 1934----___-------_____....                                                        __             -1.00

         Unobligated balance available June 30, 1934_-                                         ----        __--70,            912. 69

Amount that can be profitably expended in fiscal year ending June
   30, 1936, for maintenance 2                  _-____---_                  --                                            75, 000. 00

                                            PUBLIC WORKS FUNDS

Cost of new work to June 30, 1934------------------                                                             - $1, 016, 355.32
Cost of maintenance to June 30, 1934__          ____-------                                                       -------------

     Total cost of permanent work to June 30, 1934_....-.--                                                           1, 016, 355. 32
Minus accounts payable June 30, 1934___ ------     -__----                                                  -            147, 587. 17

     Net total expenditures ----------------------                                                                       868, 768. 15
Unexpended balance June 30, 1934_....__                                            _       _                             186, 231. 85

         Total amount appropriated to June 30, 19341__.-                                              --              1, 055, 000. 00,

  1 In addition $15,000 of contributed funds were expended.
  2Exclusive of available funds.
                RIVERS AND HARBORS-PHILADELPHIA, PA., DISTRICT                                                                    225

    Fiscal year ending June 30                       1930           1931               1932                1933               1934


Cost of new work------                            ----------------------------                       -                   $1, 016, 355. 32
Cost of maintenance------------------------                                                   --
Total expended...--------------------------------------------                                       -______                 868, 768. 15

Allotted-_----........---------------.--------------.------------                                                         1,055, 000. 00


Amount allotted from National Industrial Recovery Act approved
June 16, 1933---             ---------------------------                                                              , 055, 000. 00
                                                                                                                      1-------
Gross amount expended---__-____-------                                                                                   868, 768. 15

Balance unexpended June 30, 1934_____...._______---                                                                     186, 231. 85
Amount covered by uncompleted contracts_________-----                                                                   151, 587. 17

     Balance available June 30, 1934-------------------_                                                                 34, 644. 68
Amount allotted by Public Works Administration Emergency Ap-
propriation Act, fiscal year 1935                                                                                      7________--____----750,
                                                                                                                            000. 00
Balance available for fiscal year 1935------------------------                                                          784, 644. 68

Amount (estimated) required to be appropriated for completion
of existing project 2_______________________________________                                                         3, 150, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1936, for new work 2_---      -      -__---_                                                                3, 150, 000. 00
CONSOLIDATED COST AND FINANCIAL SUMMARY FOR DELAWARE RIVER, PHILADELPHIA-
                                  TRENTON

Cost of new work to June 30, 1934                                                                                1   $3, 590, 758. 90
Cost of maintenance to June 30, 1934 _____                                       ________________                        428, 604. 61
      Total cost of permanent work to June 30, 1934----------                                                         4, 019, 363. 51
Plus accounts receivable June 30, 1934_ ___..    _________                                                             -___     1.00
      Gross total costs to June 30, 1934 .....----------------                                                        4, 019, 364. 51
Minus accounts payable June 30, 1934________________________                                                             147, 802. 18
      Net total expenditures__________________________                                                                3, 871, 562. 33
Unexpended balance June 30, 1934--------------------------                                                               257, 403. 55
      Total amount appropriated to June 30, 1934 ___________                                                          4, 128, 965. 88

    Fiscal year ending June 30                       1930           1931               1932                1933               1934


Cost of new work---------___                     $20, 626. 54    $455, 981. 25 $1, 094, 173. 84          $13, 478. 65    $1, 016, 355. 32
Cost of maintenance_--------_                     56, 572. 72       5, 971. 14      16, 082. 20           22, 978. 25        123, 140. 45
        Total cost -----------            ---      77, 199. 26    461, 952. 39    1, 110, 256. 04         36, 456. 90     1, 139, 495. 77
Total expended----------------                     80, 420. 08    453, 199. 85    1, 118, 207. 22         35, 345. 36       997, 949. 08
Allotted_                                       500, 000. 00
                                ..---------------------           890, 000. 00      210, 230. 13          43, 000. 00     1,235, 000. 00

Balance unexpended July 1, 1933                                                                                         $20, 352. 63
Amount allotted from War Department Appropria-
tion Act approved Apr. 26, 1934_                                                             $70, 000. 00
Amount allotted from War Department Appropria-
tion Act approved Mar. 4, 1933---                                                            110, 000. 00
Amount allotted from National Industrial Recov-
ery Act approved June 16, 1933 _,_1,055,                                                           000. 00
                                                                                                                      1, 235, 000. 00
           Amount to be accounted for-........---
                                            -                                                                -       1, 255, 352.63
   1 In addition $15,000 of contributed funds were expended.
   2   Exclusive of available funds.
226       REPORT OF CHIEF            OF ENGINEERS,          U.   S.   ARMY,    1934

Gross amount expended___----------------------------------                         997, 949.08
      Balance unexpended June 30, 1934---------------------                        257, 403. 55
Outstanding liabilities June 30, 1934.----------------      260. 01
Amount covered by uncompleted contracts---------       151, 587. 17
                                                                                   151, 847. 18
      Balance available June 30, 1934     ------------------------                 105, 556. 37
Accounts receivable June 30, 1934.--------..                                              1. 00

     Unobligated balance available June 30, 1934---------------                    105, 557.37
Amount allotted by Public Works Administration Emergency Ap-
propriation Act, fiscal year 1935-____-    ________________                       750, 000. 00
       Balance available for fiscal year 1935 ------------------                   855, 557. 37

Amount (estimated) required to be appropriated for completion
of existing project -----------------------------------      3, 150, 000. 00

Amount that can be profitably expended in fiscal year ending June
30, 1936 :                - - - - - - - - - - - - - -- -- - - -- - -- -- - -- -
    For new work -1 - - -                                                        3, 150, 000. 00
    For maintenance 1- - - - - - - - - - - -                              ____       75, 000. 00

       Total 1---------------                                         --        3, 225, 000. 00

2. DELAWARE RIVER, PA., N. J., AND DEL., PHILADELPHIA, PA., TO
                                         THE SEA

   Location~.-See page 220, also United States Coast and Geodetic
Survey Charts Nos. 1218, 294, and 295.
   Previous projects.-Adopted by acts of July 4, 1836; March 3,
1873; March 3, 1875; June 18, 1878; March 3, 1879; July 5, 1884;
August 11, 1888; and March 3, 1899. The total cost and expendi-
tures were $14,001,466.63, the cost of new work being $12,976,057.61
and the cost of maintenance $1,025,409.02. For further details see
page 1779 of Annual Report for 1915.
   Existing project.-This provides for a channel from deep water in
Delaware Bay, about 8 miles below Liston Point, to Allegheny Ave-
nue, Philadelphia, a distance of about 63 miles, having a depth of
35 feet at mean low water and a width of 800 feet in the straight
parts, 1,200 feet at Bulkhead Bar, 1,000 feet at the other bends, and
1,000 feet in Philadelphia Harbor. The project includes the con-
struction of dikes for the regulation and control of the tidal flow
and dredging to provide for an anchorage 35 feet deep and about
6,400 feet long at Port Richmond; for an anchorage area 30 feet
deep and about 3,500 feet long at Gloucester, N. J.; for an anchorage
35 feet deep and about 7,300 feet long in the vicinity of Mantua
Creek; for straightening the channel and extending the 1,000-foot
width from Philadelphia Harbor to Horseshoe Bend; and for the
maintenance of any areas dredged by local interests to a depth of 35
feet between the channel and a line 100 feet channelward of the pier-
head line between Point House Wharf and the Philadelphia Navy
Yard, when in the opinion of the Chief of Engineers such areas are
so located as to be of benefit to general navigation.
    The mean range of tide at various points on the river and bay is
as follows: Philadelphia, Pa., 5.2 feet; Chester, Pa., 5.5 feet; New
Castle, Del., 5.5 feet; Liston Point, Del., 5.9 feet; and Lewes, Del.,
   1Exclusive of available funds.
       RIVERS AND   HARBORS-PHILADELPHIA,       PA.,   DISTRICT   227

4.3 feet. Under the influence of heavy and long-continued winds the
range of tide may vary from about 4 feet below to about 10 feet
above mean low water. Observations by the United States Coast
and Geodetic Survey extending over a number of years at Phila-
delphia, Pa., indicate that the mean tidal range has decreased about
0.7 foot and the elevation of mean low water has increased about
0.8 foot at that locality, as compared with the range and elevation
observed there in 1878 and earlier. T he change is probably due to
the construction of regulating works in the river. A similar change
has been observed by the Engineer Department at other points on
the river above Liston Point.
   The estimate of cost for new work revised in 1930 is $19,215,000,
exclusive of amounts expended on previous projects. The latest
 (1930) estimate for annual cost of maintenance is $1,890,000.
   The existing project was adopted by the River and Harbor Act of
June 25, 1910 (H. Doc. No. 733, 61st Cong., 2d sess.). It was modi-
fied by the River and Harbor Act of July 3, 1930 (H. Doc. No. 304,
71st Cong., 2d sess.), to provide for anchorages as above indicated
and for extending the 1,000-foot channel width in Philadelphia
Harbor to Horseshoe Bend. The latest published maps are in the
Annual Report for 1913, page 1746, and in House Document No. 304,
Seventy-first Congress, second session.
   Supplementing the work authorized by Congress, the dredging
of an anchorage area in the vicinity of Marcus Hook, Pa., 35 feet
deep, 1,200 feet wide, and 4,500 feet long, flaring to 6,900 feet on
the channel edge, as recommended by the Chief of Engineers in
Rivers and Harbors Committee Document No. 5, Seventy-third Con-
gress, first session, has been included in the public-works program
under the National Industrial Recovery Act.
   Recommended modifications of project.-Included in public-works
program.
   Terminal facilities.-There are 320 wharves within the limits of
the improvement, exclusive of a number of small wharves used as
landings for pleasure boats.
   Other municipally owned piers are: 1 at Gloucester, N. J.; 2 at
Chester, Pa.; 1 at New Castle, Del.; and 1 at Delaware City, Del.
All are open to public use.
   The terminal facilities are adequate for existing commerce and,
with additional facilities under construction or contemplated, will
provide for a great increase in the amount of commerce which
can be handled on this improvement.         (For further details see
Port Series No. 4, Corps of Engineers, pt. I, revised 1932, pt. II,
revised 1931.)

            OPERATIONS AND RESULTS DURING FISCAL YEAR

  Regtuar fids--New work.-Dredging under contract in the Port
Richmond Anchorage, in progress at the beginning of the fiscal year,
was completed September 19, 1933. The total quantity removed
under the contract was 2,090,691 cubic yards at a cost of $545,323.31.
The quantity removed during the fiscal year was 120,823 cubic yards
at a cost of $33,288.38.
228    REPORT OF CHIEF OF ENGINEERS,       U.   S.   ARMY,   1934


   Widening of the 35-foot channel to 1,000 feet below Greenwich
Point, for a length of about 3,000 feet, was continued and completed
August 18, 1933. The total quantity removed under the contract
was 445,272 cubic yards at a cost of $85,035.47. The quantity re-
moved during the fiscal year was 175,272 cubic yards at a cost of
$32,606.28.
   Maintenance.-Maintenance dredging was in progress during the
year under three contracts, two in Philadelphia Harbor, between
Allegheny Avenue and Palmer Street, and between Palmer and Arch
Streets; and one at the Engineer Department reservation at Fort
Mifflin, Pa.
   Maintenance dredging under contract in the upper portion of
Philadelphia Harbor between Allegheny Avenue and Palmer Street
was commenced July 25 and completed September 21, 1933. The
total quantity removed under the contract was 402,320 cubic yards
at a cost of $106,277.05. Additional maintenance dredging in the
portion of Philadelphia Harbor between Palmer and Arch Streets,
commenced June 12, 1934, was in progress at the end of the year,
19,000 cubic yards being removed at a cost of $11,301.01. The con-
tract was about 12 percent completed.
   Maintenance dredging at Fort Mifflin wharves was commenced
under contract June 21, 1934, and was about 69 percent completed
at the end of the year. The total quantity removed was 10,000 cubic
yards at a cost of $4,348.48.
   The work of constructing a concrete superstructure of precast
concrete blocks on the pile-and-timber portion of Pea Patch Dike,
including the furnishing and placing of riprap to cover settlement
in the original stone fill, in progress at the beginning of the fiscal
year, was completed September 13, 1934. To complete this work a
total quantity of 8,106 tons of riprap and 11,573 linear feet of cap-
ping were placed in the dike at a total cost of $101,964.33. During
the year approximately 3,856 tons of riprap and 5,255 linear feet of
capping were placed at a cost of $43,448.35.
   Contract was entered into March 10, 1934, for constructing a rip-
rap stone mound on Reedy Island Dike. This work was completed
April 21, 1934. A total of 993.35 tons of riprap were placed at a
cost of $2,979.51.
   The work of constructing a drainage sluice in the river bank at
Fort Mifflin, Pa., to replace an old wooden sluice, was commenced
under contract April 2 and completed June 25, 1934. The cost of this
work was $11,464.75.
   Preliminary costs in connection with raising the elevation of the
road and railroad tracks at Fort Mifflin, Pa., under contract dated
June 25, 1934, amounted to $234.64.
   Maintenance dredging was in progress throughout the year, except
during the winter lay-up, with the sea-going dredges Delaware, Man-
hattan, New, Orleans, and attendant plant. The Rossell was oper-
ated in the Delaware River at intervals throughout the year when
conditions in the Christiana and Schuylkill Rivers would permit.
The total quantity of material removed from the Delaware River in
maintenance work during the year was 9,714,597 cubic yards, bin
measurement, of which 493,028 cubic yards were deposited in the
        RIVERS AND HARBORS-PHILADELPHIA,         PA.,   DISTRICT   229

rehandling basins at Oldmans Point, 785,568 cubic yards in the Kill-
cohook basins, 3,883,166 cubic yards in the basins at Edgemoor,
1,925,556 cubic yards in the basins at Hog Island, and 2,627,279
cubic yards were deposited without rehandling. The cost of dredg-
ing, which includes rehandling by pipe-line, dredges and the propor-
tionate share of cost of construction and maintenance of disposal
basins, was $687,904.75.
   Dredging by the agitation method was also done at various locali-
ties with the dredges Delawnare, Manhattan, and New Orleans. Ap-
proximately 8,292,338 cubic yards were dredged and pumped over-
board by this method at a cost of $90,941.36. The pipe-line dredge
Alabama was also engaged in widening the channel to the eastward
on Bulkhead Bar and New Castle ranges. Approximately 53,295
cubic yards were removed at this locality at a cost of $9,451.17.
   The Government derrick boat Rattler was engaged at periods
during the year in sweeping for and removing scattered boulders,
fragments of blasted rock, and other hard shoals from the channel on
Marcus Hook and Bellevue ranges. The sweeping operations cov-
ered an area of approximately 550,000 square yards. The cost of this
item was $16,405.37.
   Other maintenance costs during the year included repairs to Pea
Patch and Hope Creek Dikes, $13,241.27; repairs to banks at Fort
Mifflin Reservation, $16,234.81; study of the regimen of the Delaware
River, including investigation of discharge, tides and currents, saline
content, and silt movements, $42,974.55; surveys and channel exam-
inations, $16,031.20; removing miscellaneous obstructions and debris,
$2,367.25; survey in connection with widening of lower Mifflin, Bill-
ingsport, and upper Tinicum ranges to the westward, $181.78; stabi-
lizing the foundation of Island No. 6, Pea Patch Dike, $689.81; oper-
ation of tide gages on the Delaware River below Philadelphia,
$3,518.17; and safety engineering, $3,829.01.
   The total cost of all new work during the year was $65,894.66. The
total cost of all maintenance work was $1,083,824.29. The com-
bined cost of new work and maintenance was $1,149,718.95. The
total expenditures were $1,004,734.61.
   Publio Works funds.-Operations conducted with Public Works
funds consisted of two contracts covering dredging of anchorages
in the Delaware River opposite Gloucester, N. J., and Marcus Hook,
Pa. Under contract for dredging an anchorage opposite Gloucester,
N. J., commenced November 7, 1933, a total of 466,800 cubic yards
were removed at a cost of $273,887.72 for new work. This contract
was 89 percent completed at the end of the fiscal year.
   The contract for dredging an anchorage opposite Marcus Hook,
Pa., was commenced October 25, 1933, and was 43 percent completed
at the end of the fiscal year. A total of 1,097,500 cubic yards were
removed at a cost of $243,676.40 for new work. The total cost of
new work conducted with Public Works funds during the year was
$517,564.12. Total expenditures were $451,173.12.
   The total cost, all funds, was $1,667,283.07-$583,458.78 for new
work and $1,083,824.29 for maintenance. The total expenditures
were $1,455,907.73.
230    REPORT OF    CHIEF   OF ENGINEERS,   U.   S.   ARMY,   1934

   Condition at end of fscal year.-Work performed with mainte-
ance and improvement funds, based on a comparison of the cost of
new work done under the existing projects with its total estimated
cost, is about 99 percent completed. The entire length of the 35-foot
channel, extending for 63 miles from Allegheny Avenue, Philadel-
phia, Pa., to deep water at the lower end of Liston Range, has been
completed to project dimensions. Portions of the channel are sub-
ject to constant shoaling, but according to the latest examinations
 (May-June 1934), a navigable channel with a controlling depth of
35 feet at mean low water extends from Philadelphia to the sea. The
dikes provided for in the project at Mifflin Bar, Chester Island, Old-
mans Point, Edgemoor, Reedy Island, Alloway Creek, Stony Point,
and Hope Creek, having a total length of about 32,372 feet, have
been completed. In addition the Pea Patch Island training dike,
approximately 20,000 feet long, was completed during the calendar
year 1933. Repairs to Hope Creek Dike, damaged by a storm in
August 1933, was in progress at the end of the year. Of the new
anchorages to be provided under the project, those at Mantua Creek
and Port Richmond have been completed. Both these anchorages
have project depths of 35 feet.
   The total estimated quantity of material other than ledge rock
removed by contract in original channel dredging was approximately
54,001,483 cubic yards, exclusive of excess overdepth dredging. In
addition, 3,461,646 cubic yards were removed from Mantua Creek
anchorage, 2,090,691 cubic yards from Port Richmond anchorage,
and 466,800 cubic yards were removed from the Gloucester anchor-
age. The total quantity removed by Government plant was approxi-
mately 2,829,986 cubic yards, making a total of 62,850,606 cubic
yards removed under the project. The total quantity of ledge rock
and boulders removed by contract under the project was 145,418 cubic
yards. In addition, approximately 1,239 cubic yards were removed
by Government and leased plant.
   The completion of dredging at Gloucester anchorage, which was in
progress at the end of the year with public-works funds, will com-
plete all new work covered by the existing project.
   The total cost of the existing project to the end of the fiscal year,
excluding cost of work performed with public-works funds, was
$40,783,025.52, of which $17,021,228.20 was for new work and $23,761,-
797.32 was for maintenance. The total expenditures have been
$45,442,486.96.
   The work remaining to be done to complete the improvement,
including the recommended modification included in the public-works
program, is the dredging of about 51,000 cubic yards at Gloucester
anchorage and about 1,287,000 cubic yards at Marcus Hook anchorage.
   The total cost of the work done with public-works funds to the end
of the fiscal year was $517,564.12, all for new work. Total expendi-
tures were $451,173.12.
   Proposed operations.-It is proposed to apply the funds unex-
pended and accounts receivable on June 30, 1934, amounting to
 $1,155,133.40, as follows:
         RIVERS AND HARBORS-PHILADELPHIA,                                  PA.1 DISTRICT        231
Accounts payable June 30, 1934 _ __---_                     -        - -   -     --     $69, 721.56

Maintenance :
   Operation and care of hopper dredges New Orleens and
     Rossell; pipe-line dredges Gillespie, Alabama, and attend-
     ant plant throughout the fiscal year, including annual
      overhaul             -___-___-                                                    700, 000. 00
   Completion of maintenance dredging in Philadelphia Harbor,
     Palmer Street to Arch Street, under contract in force____                          109, 000. 00
   Completion of dredging at Fort Mifflin wharves under con-
     tract in force_ _____ __-                                                           10, 000. 00
   Dredging upper channel and Port Richmond anchorage by
      contract (March-June 1935) _                   -          --                      132,. 000. 00
    Completing repairs to Hope Creek Dike with Government
      plant and hired labor (July-September 1934)-                                       32, 000. 00
    Repairing Edgemoor Dike where settlement has occurred
      with derrick boat Rattler and attendant plant (October
      1934-May 1935)-------------------
                           _--                                                           35, 000. 00
    Raising the elevation of road and railroad at Fort Mifflin
     Reservation under contract in force                                                   5., 000. 00
    Sweeping and removing boulders on Bellevue Range with der-
     rick boat No. 32 and attendant plant (July-September 1934)_                         12 000. 00
    Miscellaneous surveys and channel examinations during fiscal
      year                             -__                                               35, 000. 00
    River studies, including operation of tide gages to June 30,
      1935 ---------------------------            __                                     15, 411. 84

                                                                                      1, 085, 411. 84

      Total_______    ________________          _____                                 1, 155, 133.40
   Maintenance dredging with Government plant will be continued
throughout the year except during the winter lay-up, when annual
repairs will be made. The maintenance dredging at Port Richmond
anchorage and in the channel above Greenwich Point, next spring,
will provide for the removal of anticipated shoals. The repairs to
Hope Creek Dike will complete restoration of sections of the super-
structure damaged by storms, and will considerably reduce the haz-
ard to small craft presented by this dike in its present condition.
Repairs to Edgemoor Dike will prevent the escape of impounded
dredged material where the dike has settled.
   It is proposed to apply the unexpended balance of Public Works
funds on June 30, 1934, in the amount of $398,826.88, as follows:
Accounts payable June 30, 1934_________________________---------                        $66,391.00

New work:
   Completion of Gloucester Anchorage under contract in force_..  25, 000. 00
   Completion of Marcus Hook Anchorage under contract in force__ 307, 435. 88
                                                                                        332, 435. 88

      Total-----           ------------------------------                               398, 826. 88
  The dredging of the Gloucester Anchorage will complete all new
work under the project as authorized by Congress, and the dredging
of the Marcus Hook Anchorage to full dimensions, will complete the
supplemental work on this project included in the Public Works pro-
gram under the National Industrial Recovery Act.
232        REPORT OF CHIEF OF ENGINEERS, U. S. ARMVY,                                                      1934

  The sum of $1,000,000 can be profitably expended during the fiscal
year 1936, as follows:
Maintenance :
   Operation and repairs of hopper dredges Delaware, Manhattan,
      New Orleans, Rossell; pipe-line dredges Alabama, Gillespie,
      Huston and attendant plant for such periods as available funds
      permit---------     ------------------------------------ $950, 000
   Channel examinations and operation of tide gages------------.     50, 000

         Total_     __---_--         __               --------------------                                       1, 000, 000

                                    Cost and financial suicnumary
                              MAINTENANCE AND IMPROVEMENT FUNDS

Cost of ne wwork to June 30, 1934--------------------------1 $29, 997, 285. 81
Cost of maintenance to June 30, 1934_ --------------------- 2 24, 787, 206. 34

      Total cost of permanent work to June 30, 1934--------                                                54, 784, 492. 15
Value of plant, materiols, etc., on hand June 30, 1934--------                                              4, 575, 510. 27

      Net total cost to June 30, 1934----------------------                                                59, 3601, 002. 42
Plus accounts receivable June 30, 1934----------------------                                                   153, 672. 73

     Gross total costs to June 30, 1934--------------------                                                59, 513, 675. 15
Minus accounts payable June 30, 1934 ....-                                                                      69, 721. 56

     Net total expenditures----------------------------59, 443, 953. 59
Unexpended balance June 30, 1934------------------------  1, 001, 460. 67

        Total amount appropriated to June 30, 1934------------                                             60, 445, 414. 26

   Fiscal year ending June 30             1.930              1931                 1932              1933             1934


Cost of new work...--------------   1, 258, 916. 43 $1, 861, 823. 22 $1, 120, 444. 50           $856, 717. 97        $65, 894. 69
Cost of maintenance- ..........     1, 609, 568. 33 2, 384, 787. 13 2, 083, 586. 00            1, 935, 671. 27    1, 083, 824. 26
      Total cost         __         2, 868, 484. 76     4, 246, 610. 35      3, 204, 030. 50   2, 792, 389. 24    1. 149, 718. 95
Total expended ._________________ 3, 319, 220. 61       4, 517, 380. 40      3, 425, 361.92    2, 206, 260. 86    1, 004, 734. 61
Allotted -----------------------    3, 827, 000. 00    2, 356, 600. 00         296, 359. 62    2, 549, 552. 60    1, 309, 140. 55


Balance unexpended July 1, 1933_-------------------------$697,          054.73
Amount allotted from War Department Appropria-
tion Act approved Apr. 26, 1934------------$350, 000.00
Amount allotted from War Department Appropria-
tion Act approved Mar. 4, 1933---------------- 1, 154, 300. 00
                                                                1, 504, 300. 00

     Amount to be accounted for---------------------------2,    201, 354. 73
Deductions on account of revocation of allotment---------------195, 159. 45

      Net amount to be accounted for------------------------    2, 006, 195. 28
Gross amount expended-------------------------- 1, 724, 534. 77
Less:
    Reimbursements collected -------- $718, 819. 30
    Receipts from sales--------------       980. 86
                                                                                         719, 800. 16
                                                                                                            1, 004, 734. 61

         Balance unexpended June 30, 1934                             ------------------- 1, 001, 460. 67
   SIncrease adjustment of $2,467.90 made in cost of completed work prior to current
fiscal year.
   2 Increase adjustment of $4,767.80 made in cost of completed work prior to current
fiscal year.
              RIVERS AND HARBORS-PHILADELPHIA,                       PA., DISTRICT                      233
Outstanding liabilities June 30, 1934---------------                 117, 158. 17
Amount covered by uncompleted contracts-.-....                       112, 402. 00
                                                                                               229, 560. 17

     Balance available June 30, 1934--------------------_                                       771, 900. 50
Accounts receivable June 30, 1934__                                                             153, 672. 73

           Unobligated balance available June 30, 1934------------                             925, 573. 23

Amount that can be profitably expended in fiscal year ending
   June 30, 1936, for maintenance 1                                             -_____     1, 000, 000. 00

                                        PUBLIC   WORKS FUNDS

Cost of new work to June 30, 1934__________________                                            $517, 564. 12
Cost of maintenance to June 30, 1934_

      Total cost of permanent work to June 30, 1934_________                                    517, 564. 12
Minus accounts payable June 30, 1934 -----     ___________-__                                    66, 391. 00

           Net total expenditures_                                                              451, 173. 12
Unexpended         balance June 30, 1934____________________________                            398, 826. 88

           Total amount appropriated to June 30, 1934 ...........                               850, 000. 00

           Fiscal year ending June 30            1930        1931    1932               1933          1934


Cost of new work .       .-                             --                                 -       $517, 564. 12
Cost ofmaintenance___
Total expended_                                                                                     451, 173. 12
Allotted                                                                    .                       3....
                                                                                                    850, 000. 00


Amount allotted from National. Industrial Recovery Act approved
   June 16, 1933---                               -                                            $905, 000. 00
Deductions on account of revocation of allotment_______________                                  55, 000. 00

      Net amount to be accounted for-  --- ____---_______--_                                    850, 000. 00
Gross amount expended ____________________-    ________451,                                          173. 12

    Balance unexpended June 30, 1934-_____ _______________                                      398, 826. 88
Amount covered by uncompleted contracts ____________---382,                                          603. 98

           Balance available June 30, 1934_________________                                      16, 222. 90

CONSOLIDATED COST AND' FINANCIAL SUMMARY FOR DELAWARE RIVER, PHILIADELPHIA-
                                                      SEA

Cost of new work to June 30, 1934_____________                      ___         _   2   $30, 514, 849.93
Cost of 'maintenance to June 30, 1934_ ________                     _______             3 24, 787, 206. 34

      Total cost of permanent work to June 30, 1934----        -__ 55, 302, 056. 27
Value of plant, materials, etc., on hand June 30, 1934 --------     4, 575, 510. 27

      Net total cost to June 30, 1934________1________11                                 59, 877, 566. 54
Plus accounts receivable June 30, 1934_______________-----                                   153, 672. 73
      Gross total costs to June 30, 1934_____________----                                60, 031, 239. 27
Minus accounts payable June 30, 1934________________ -__                                     136, 112. 56
      Net total expenditures---_____------___                                            59, 895, 126. 71
Unexpended balance June 30, 1934_      -         -         - - -                          1,400, 287. 55
      Total amount appropriated to June 30, 1934____________                             61, 295, 414. 26
   1Exclusive of available funds.
   2 Increase adjustment of $2,467.90 made in cost of completed work prior to current
fiscal year.
   8 Increase adjustment of $4,767.80 made in cost of completed work prior to current
fiscal year.
234           REPORT          OF CHIEF OF ENGINEERS,                        U.    S.      ARMY,        1934


    Fiscal year ending June 30            1930              1931              1932              1933             1934


Cost of new work             $1, 258, 916. 43 $1, 861, 823. 22 $1, 120, 444. 50
                       .------------                                                        $856, 717. 97      $583, 458. 78
Cost of maintenance---------- 1, 609, 568. 33 2, 384, 787. 13 2, 083, 586. 00              1, 935, 671. 27    1, 083, 824. 29
       Total cost--------------      2, 868, 484. 76   4, 246, 610. 35   3, 204, 030. 50   2, 792, 389. 24    1, 667, 283. 07
Total expended --------.........     3, 319, 220. 61   4, 517, 380. 40   3, 425, 361.92    2, 206, 260. 86    1,455, 907. 73
Allotted     ..-------------------   3, 827, 000. 00   2, 356, 600. 00     296, 359. 62    2, 549, 552. 60    2,159, 140. 55


Balance unexpended July 1, 1933--------------------------$697,           054.73
Amount allotted from War Department Appropria-
  tion Act approved Apr. 26, 1934 ____________ $350, 000. 00
Amount allotted from War Department Appropri-
  ation Act approved Mar. 4, 1933- -----       __ 1, 154, 300.00
Amount allotted from National Industrial Recovery
  Act approved June 16, 1933 ---------   _______-905, 000. 00
                                                                 2, 409, 300. 00

     Amount to be accounted for- ----------------                                                       3,106, 354. 73
Deductions on account of revocation of allotment-----__                                ------             250, 159. 45

      Net amount to be accounted for      ---------------------- 2, 856, 195. 28
Gross amount expended-------------------_            2, 175, 707. 89
Less:
    Reimbursements collected------- $718, 819. 30
    Receipts from sales--------------_       980. 86
                                                        719, 800. 16
                                                                     1, 455, 907.73

Balance unexpended June 30, 1934        -----------------------     1, 400, 287.55
Outstanding liabilities June 30, 1934-------------     117, 158. 17
Amount covered by uncompleted contracts---------       495, 005. 98
                                                                       612, 164. 15

     Balance available June 30, 1934- ------------------                                                     788, 123.40
Accounts receivable June 30, 1934 --------------------------                                                 153, 672. 73

           Unobligated balance available June 30, 1934__________---                                          941, 796. 13

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1----------------------------_         1,000,000.00

                             3. DELAWARE RIVER AT CAMDEN, N. J.

   Location.-Camden, N. J., is located on the east bank of the Dela-
ware River, directly opposite the city of Philadelphia, Pa. It is
about 55 miles above the mouth of the river and about 101 miles
above the harbor of refuge at the mouth of Delaware Bay. (See
U. S. Coast and Geodetic Survey Chart No. 295.)
   Previous projects.-Adopted June 25, 1910. No work was done on
this project. (For further details see p. 321, Annual Report for
1932.)
   Existing project.-This provides for dredging in front of Camden
to a depth of 18 feet at mean low water from that depth north of
Cooper Point to Berkley Street, and 30 feet from the latter point to
Newton Creek, these depths to extend from the 35-foot channel in the
Delaware River to a line parallel with and 50 feet distant from the
established pierhead line. The distance from Cooper Point to Berk-
    1Exclusive of available funds.
            RIVERS AND HARBORS-PHILADELPIIA,                                          PA.,        DISTRICT         235
ley Street is about 1.5 miles, and from Berkley Street to Newton
Creek is about 2.3 miles. The mean range of tide is 5.2 feet, and the
extreme range under the influence of prolonged heavy winds is from
about 4 feet below to about 10 feet above mean low water.
   The estimate of cost for new work, revised in 1930, is $480,300,
exclusive of $15,000 contributed by local interests. The latest (1930)
estimate for annual cost of maintenance is $25,000.
   The existing project as adopted by the River and Harbor Act of
March 2, 1919 (H. Doc. No. 1120, 63d Cong., 2d sess.), provided for
the 18-foot channel and for a depth of 30 feet from Newton Creek
to Kaighn Point. The River and Harbor Act of July 3, 1930 (H.
Doec. No. 111, 70th Cong., 1st sess.), modifies the project to provide
for extending the 30-foot depth upstream to Berkley Street. The
latest published maps are in the project documents.
    Local cooperation.-Fullycomplied with.
    Terminal facilities.-There are 70 wharves within the limits of this
improvement, of which 66 are privately owned and operated. The
wharves on this portion of the Camden water front are included in
those described under the project for improving Delaware River from
Philadelphia to the sea. (For further details see Port Series No. 4,
Corps of Engineers, pt. I, revised 1932.)
    Operations and results during fiscal year.-No operations were in
progress and no expenditures were made.
    Condition at end of fiscal year.-The project was completed in
1931 at a saving of $17,394 under the estimated cost. The latest
examination (April 1934) shows some shoaling along and near the
pierhead line, at Cooper Point, and below Kaighn Point, but not of
sufficient extent to require maintenance dredging at the present time.
    The total costs and expenditures, excluding $15,000 contributed
funds which were expended for new work, have been $465,159.08, of
which $462,905.66 was for new work and $2,253.42 for maintenance.
    Proposed operations.-No funds are available.
    The sum of $40,000 can be profitably expended during the fiscal
year 1936 in maintenance dredging as required to restore project
depth between Kaighn Point and the Camden Marine Terminal, by
contract.
                                       Cost and financial summary

Cost of new work to June 30, 1934__________________-_______                                                 $462, 905. 66
Cost of maintenance to June 30, 1934___________________________                                                2, 253. 42

         Total cost of permanent work to June 30, 1934 _________--465, 159. 08

Net total expenditures___----------------------                                                              465, 159. 08
Total amount appropriated to June 30, 1934_                                                                  465, 159. 08

          Fiscal year ending June 30                   1930            1931           1932           1933         1934


Cost of new work -___-           ___
Cost of maintenance-..------------         -------------------- ------------
                                                                            716. 9 $108, 863.69
                                             _ __-----------------_--------$184,                   ...----     ------
                                                                                                     $329.97 -------
Total expended----          -------------------............................
                                                                       137, 303. 19 156, 277.09       329.97 ..
Allotted..-----...............................-----------------------...259, 000. 00 34, 910. 25
   Amount that can be profitably expended in fiscal year ending June
   30, 1936, for maintenance--------------------------               $40, 000
236    REPORT OF CHIEF OF ENGINEERS,        U.   S.   ARMVY   1934

                     4. SCHUYLKILL RIVER, PA.

   Location.-This river has its source in Schuylkill County, Pa.,
flows in a general southeasterly direction, and empties into the Dela-
ware River at Philadelphia, Pa. (See U. S. Coast and Geodetic
Survey Charts Nos. 295 and 280.)
    Previous projects.-Adopted by acts of July 11, 1870, and April 26,
1892. The total costs and expenditures of all projects, prior to the
adoption of the existing project, which was begun in 1918, were
$525,000, all for new work. (For further details see page 325, An-
nual Report for 1932.)
    Existing project.-This provides for a channel 30 feet deep at
mean low water and 400 feet wide from Delaware River Channel to
Twenty-ninth Street, thence 30 feet deep and 300 feet wide to
Passyunk Avenue Bridge, thence 26 feet deep and 200 feet wide to
Gibsons Point, and thence 22 feet deep and 200 feet wide to Cleve-
land Avenue (now University Avenue), suitably widened at bends.
The length of the section included in the project is about 6.5 miles.
The mean range of tide at Penrose Ferry Bridge is 5.1 feet, and at
Chestnut Street 5.2 feet. Freshets occur several times a year, and
when accompanied by heavy and prolonged winds have been known
to raise the water surface as much as 12 feet above mean low tide.
The currents produced by tides and freshets occasionally attain a
velocity of 6 miles per hour, the normal maximum velocity being
about 2 miles per hour.
    The estimate of cost for new work, revised in 1930, is $1,490,000,
exclusive of amounts expended on previous projects. The latest
 (1930) approved estimate for annual cost of maintenance is $200,000,
in addition to $1,300,000 required to restore the project depths be-
tween the mouth and Passyunk Avenue Bridge.
    The existing project was adopted by the River and Harbor Act
of August 8, 1917 (H. Doc. No. 1270, 64th Cong., 1st sess.), and modi-
fied by the River and Harbor Act of July 3, 1930 (Rivers and Har-
bor Committee Doc. No. 40, 71st Cong., 2d sess.), to provide for a
channel depth of 30 feet instead of 35 feet between the mouth and
Girard Point, and for the restoration and maintenance of the chan-
nel below Passyunk Avenue by the United States under certain con-
ditions. (See paragraph Local cooperation.) The latest published
map is in Rivers and Harbors Committee Document No. 40, Seventy-
first Congress, second session.
    Local cooperation.-The existing project as originally adopted
imposed the condition that the city of Philadelphia or the State of
Pennsylvania should maintain the improved channel until the com-
pletion of the city's projected sewage-treatment works. The River
and Harbor Act of July 3, 1930, provides for restoration and main-
tenance of the project from the mouth to Passyunk Avenue Bridge
by the United States in advance of the completion of the munici-
pal sewage-treatment works, provided the city of Philadelphia shall
give assurances satisfactory to the Secretary of War and the Chief
of Engineers that it will dredge not less than 300,000 cubic yards
annually in maintaining the channel above Passyunk Avenue Bridge
and in cooperation with the United States in channel maintenance
below Passyunk Avenue. On December 23, 1930, the Secretary of
                RIVERS AND HARBORS-PHILADELPHIA,                                                   PA.,      DISTRICT                  237
War approved an ordinance passed by city council of Philadelphia,
and letter from the mayor giving assurance that the required annual
dredging will be done, as satisfactory compliance with the project
requirements for local cooperation.
   Terminal facilities.-The terminals are considered adequate for
existing commerce. (For further details see Port Series No. 4, Corps
of Engineers, pt. I, revised 1932.)
   Operations and results during fiscal year.-Maintenance dredg-
ing under contract to restore the project dimensions between
Yankee Point and Passyunk Avenue, commenced during the pre-
vious year, was completed September 5, 1933. Quantity removed
during the fiscal year was 383,450 cubic yards, place measurement,
at a cost of $67,835.10, for maintenance. Additional maintenance
dredging between Yankee Point and Passyunk Avenue was com-
menced June 25, 1934. Preliminary work in connection with this
contract cost $155.51, for maintenance.
   The U. S. dredges Manhattan and Rossell were engaged at in-
tervals in maintenance dredging between the mouth and Yankee
Point, approximately 1,213,332 cubic yards, bin measurement, being
removed during the fiscal year at a cost of $166,010.04 for mainte-
nance. Channel examinations were made as required during the
year at a cost of $4,885.25, for maintenance.
   The total cost of work done during the year was $238,885.90, all
all for maintenance. The total expenditures were $234,617.51.
   Condition at end of fiscal year.-The project is approximately
98 percent completed. The total quantities removed in original ex-
cavation under the project were 9,511.5 cubic yards, place measure-
ment, of ledge rock and 4,044,868 cubic yards, scow measurement,
of other material. The work remaining to be done to complete the
project is the removal of a few rock shoals in the channel above
Passyunk Avenue, which will be deferred until the overlying mud
shoals are removed by the city of Philadelphia as required by the
project.
   Rapid shoaling of the portion of river included in the improve-
ment necessitates redredging at frequent intervals. The latest sur-
veys (April-June 1934), show present controlling depths at mean
low water available to navigation about as follows:

                                                    Section                                                          Project         Present
                                                                                                                     depth            depth

                                                                                                                         Feet         Feet
Mouth to Girard Point ......................................----------------------------------------------------                30       29. 2
Girard Point to Penrose Ferry Bridge-----------------------------------------                                                   30       28. 7
Penrose Ferry Bridge to Passyunk Avenue-------------------------------------                                                    30       27. 1
Passyunk Avenue to Gibsons Point---.....----------------------------------                                       ----.          26       18.5
Gibsons Point to University Avenue...----.------------------------------------                                                  22       14. 7


   A contract was awarded on June 25, 1934, for restoring the channel
between Yankee Point and Passyunk Avenue to project depth, and
work thereunder will be commenced in July 1934.
   The total cost was $2,899,718.92, of which $1,456,001.01 was for
new work and $1,443,717.91 was for maintenance. Total expendi-
tures were $2,878,661.99.
238            REPORT OF CHIEF OF ENGINEERS,                                          U. S. ARMY, 1934

    Proposed operations.-It is proposed to apply the funds unex-
pended on June 30, 1934, amounting to $251,338.01, as follows:
Accounts payable June 30, 1934--------------------------------$21, 056. 93
Maintenance :
    Dredging under contract in force between Yankee
      Point and Passyunk Avenue (July-October
      1934) -------------------------------                $106, 735. 00
    Dredging by Rossell, mouth to Yankee Point,
      during fiscal year (including surveys and
      overhead) ------------------------------------ 120, 000. 00
    Channel examinations throughout the year--------          3, 546. 08
                                                                         230, 281.08
      Total ----------------------------------------------               251, 338. 01
  The proposed dredging is expected to maintain project depth from
the Delaware River to Passyunk Avenue throughout the fiscal year.
  The sum of $300,000 can be profitably expended during the fiscal
year 1936 in maintenance dredging, by contract and with Govern-
ment plant, during the fiscal year.
                                            Cost and financial summary

Cost of new work to June 30, 1934---------------------------$1, 981, 001. 01
Cost of maintenance to June 30, 1934                             443, 717. 91
                                                              1-------------------------,
      Total cost of permanent work to June 30, 1934---------- 3, 424, 718. 92
Minus accounts payable June 30, 1934-------------------------     21, 056. 93
      Net total expenditures--------------------------------- 3, 403, 661. 99
Unexpended balance June 30, 1934-----------------------------    251, 338. 01
      Total amount appropriated to June 30, 193411            3, 655, 000. 00

    Fiscal year ending June 30                      1930              1931              1932          1933             1934


Cost of new work..-----------------------        ---------------------------------------
Cost of maintenance__------------------   $254, 886. 64 $683, 466. 43 $265, 744. 44                                  $238, 885. 90
Total expended_                              _-------               230, 941.00      657, 463. 53   298, 904. 44      234, 617. 51

Allotted.......-------------------...........----..........-------1, 038, 500. 00   -113, 500. 00   310, 000. 00      420, 000. 00


Balance unexpended July 1, 1933 --------------------       ---         $65,                                            955. 52
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934------------------------ $80, 000. 00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933--_ -----------------------     340, 000.00
                                                                       420,                                            000.   00
      Amount to be accounted for----------------                       485,                                            955.   52
Gross amount expended---------------------------------------           234,                                            617.   51
      Balance unexpended June 30, 1934------------------------- 251,                                                   338.   01
Outstanding liabilities June 30, 1934_-------------------  21, 056. 93
Amount covered by uncompleted contracts------------- 106, 735. 05
                                                                       127,                                            791. 98
      Balance available June 30, 1934-------------------- ------ 123,                                                  546. 03

Amount (estimated) required to be appropriated for completion                                  of
                   - - - - - - - - - - - -- - -- - - - - - - - - - - - - - - - - - - - - - --- -
existing project 1                                                                                                34, 000. 00

Amount that can be profitably expended in fiscal year ending June
                            - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
30, 1936, for maintenance 1                                                                     300, 000. 00

   1Exclusive of available funds.
       RIVERS AND HARBORS-PHILADELPHIA,          PA.   DISTRICT    239
                    5. WILMINGTON    HARBOR, DEL.

    Location.-This harbor is formed by the Christiana River, which
rises in New Castle County, Del., flows northeasterly 16 miles, passing
through the city of Wilmington, Del., and empties into the Delaware
River about 29 miles below Philadelphia, Pa. (See U. S. Coast and
Geodetic Survey Chart No. 294.)
    Previous projects.-Work was done on the Christiana River from
1836 to 1838. The original project was adopted by act of July 11,
1870, and modified by acts of March 3, 1881, and July 5, 1884. The
costs and expenditures were $402,121.21 for new work. For further
details see page 1785 of Annual Report for 1915.
    Existing project.-This provides for a harbor at the mouth of the
river, with an entrance channel 30 feet deep at mean low water and
400 feet wide, an inner basin of the same depth approximately 4,400
feet long, and averaging 600 feet in width, or about 70 acres in area,
and extending upstream from the entrance channel at the mouth of
the river to the Lobdell Canal. From the Lobdell Canal provision
is made for a channel extending upstream 21 feet deep at mean low
water and 250 feet wide to the mouth of the Brandywine River, a
distance of 1.6 miles from the mouth of the Christiana, thence 200
feet wide to the pulp works, 4 miles above the mouth, thence decreas-
ing to a depth of 10 feet to the Philadelphia, Baltimore & Wash-
ington Railroad bridge no. 4, thence decreasing to a depth of 7 feet
and a width of 100 feet to Newport, Del., 83/4 miles above the mouth,
and for the construction of two jetties at the mouth of the Christiana
River and one at the mouth of the Brandywine River. The north
jetty is a curved, stone-filled pile and timber crib 2,150 feet long.
The jetty at the mouth of the Brandywine is also a stone-filled pile
and timber crib V-shaped, 430 feet long on the Brandywine side,
and 260 feet long on the Christiana side. The section included in
the project is about 9 miles long, including about 1,800 feet outside
the mouth. The mean- range of tide is 5.4 feet at the mouth and 5.4
feet at Newport. Under the influence of prolonged heavy winds, the
range of tide may vary from about 2 feet below to about 11 feet
above mean low water.
     The estimate of cost for new work, revised in 1930, is $992,200,
  exclusive of amounts expended on previous projects. The latest
  (1930) approved estimate for annual cost of maintenance is $281,000,
  of which $152,000 is the estimated cost for annual maintenance of
  the 30-foot channel.
     The existing project was adopted by the following river and
  harbor acts: The act of June 3, 1896, as modified by the act of March
  3, 1899, provided for depths of 21, 10, and 7 feet, and for the jetties
   (H. Doc. No. 66, 54th Cong., 1st sess.; Annual Report for 1896, p.
  973; and Annual Report for 1897, p. 1250); the act of July 25, 1912,
  provided for the purchase or construction of a dredge and auxil-
  iaries, including a wharf and depot, for maintenance of the project
   (H. Doc. No. 359, 62d Cong., 2d sess.); and the act of September 22,
  1922 (H. Doe. No. 114, 67th Cong., 1st sess.), amended by the River
  and Harbor Act approved March 3, 1925 (Senate committee print,
  68th Cong., 1st sess.), provided for the entrance channel and basin
  25 feet deep and construction of new south jetty; and the act of July
      91536-ENG 1934-16
240    REPORT OF CHIEF OF ENGINEERS,         U.   S.   ARMY,   1934


3, 1930, provided for a depth of 30 feet between the Delaware River
and the Lobdell Canal and authorized the modification or removal of
a portion of the north jetty (Rivers and Harbors Committee Doc. No.
20, 71st Cong., 2d sess.).
   The latest published map of the entire harbor is in House Docu-
ment No. 66, Fifty-fourth Congress, first session. A map of the
25-foot section of the harbor is published in House Document No.
114, Sixty-seventh Congress, first session, and of the 30-foot section
in Rivers and Harbors Committee Document No. 20, Seventy-first
Congress, second session.
   Recommended modificaitions of project.-Under date of February
27, 1934, the Chief of Engineers recommended modification of the
existing project so as to release the city of Wilmington, or other local
interests, from further construction of the south jetty, and to pro-
vide for the completion thereof by the United States at an estimated
cost of $180,500, with a consequent large reduction in the cost of
annual maintenance of the harbor, subject to certain conditions of
local cooperation (Rivers and Harbors Committee Doc. No. 32, 73d
Cong. 2d sess.).
   Local cooperation.-The River and Harbor Act approved Sep-
tember 22, 1922, amended by the River and Harbor Act approved
March 3, 1925, requires that the city of Wilmington, Del., or other
local agency shall construct the south jetty.
   Terminal facilities.-A nmarine terminal to serve ocean and coast-
wise vessels was completed in 1923 by the harbor commission of
Wilmington with warehouses and freight-handling devices and
directly connected with all railroads entering the city. There is
also a practically continuous series of wharves or terminals on both
sides of the Christiana River from the plant of the American Car &
Foundry Co. to the Jessup & Moore Paper Co., a total length of about
2 miles. The harbor facilities consist of wharves, marine railways,
drydocks, shipyards, and terminal warehouses equipped with han-
dling appliances. (See Port Series No. 4, Corps of Engineers.)
   Operations and results during fiscal year.-The U. S. dredge
Rossell was engaged at intervals in maintenance dredging between
deep water in the Delaware River and the Wilmington Marine Ter-
minal (Lobdells Canal), approximately 1,194,718 cubic yards, bin
measurement, being removed during the fiscal year at a cost of
$104,608.92 for maintenance. In addition, 825,567 cubic yards were
removed by the agitation method at a cost of $11,140.19 for mainte-
nance. Channel examinations were made as required during the
year at a cost of $3,109.10 for maintenance.
   The total cost of work during the year was $118,858.21, all for
maintenance. The total expenditures were $142,906.21.
   Condition at end of fiscal year.-The project has been completed
with the exception of the construction of the remaining portion of
the south jetty by the city of Wilmington, Del., or other local agency,
the widening and deepening of the inner basin, approximately 4,400
feet long, from 400 to 600 feet wide, with a depth of 30 feet. The
controlling depths at mean low water on June 30, 1934, were as
follows: From Delaware River to Lobdells Canal, 31 feet; thence
to the pulp works, 15.1 feet; thence to the Pennsylvania Railroad
bridge no. 4, 8.3 feet; and thence to 1,700 feet upstream from the
highway bridge at Newport, 6.3 feet.
            RIVERS AND HARBORS-PHILADELPHIA,                                              PA., DISTRICT               241
  The total cost of the project to the end of the fiscal year, excluding
$60,000 contributed by the city of Wilmington, which was expended
for maintenance, was $3,853,424.53, of which $924,356.12 was for new
work and $2,929,068.41 for maintenance. Total expenditures have
been $3,852,761.31, exclusive of $60,000 contributed funds.
  Proposed operations.--It is proposed to apply the funds unex-
pended on June 30, 1934, amounting to $198,067.48, as follows:
                               _--
Accounts payable June 30, 1934 ------------------                                                                 $663. 22
Maintenance :
    Maintenance dredging by hopper dredge Rossell be-
      tween the mouth and Lobdell Canal, throughout
         the year---------------------------                               --             $194, 000. 00
      Channel examinations throughout the year-------                                        3,404.26
                                                                                                             197, 404. 26

         Total-----------------                                                  ------                      198, 087. 48
   The Rossell will be operated during six or more periods of                                                       about
2 weeks, distributed approximately uniformly throughout the                                                         fiscal
year.
   The sum of $200,000 can be profitably expended during the                                                        fiscal
year 1936 in maintenance dredging by Government plant, the                                                          work
to be performed as required throughout the fiscal year.
                                      Cost and financial summary
Cost of new work to June 30, 1934--------------------------    $1,326, 477. 33
Cost of maintenance to June 30, 1934--------------------------12, 929, 068. 41
      Total cost of permanent work to June 30, 1934-----------                                          4, 255, 545. 74
Minus accounts payable June 30, 1934--------------------------                                                  663. 22

     Net total expenditures------------------ ----------------- 4,254, 882. 52
Unexpended balance June 30, 1934------------------------------    198, 067.48

         Total amount appropriated to June 30, 1934--------------- 4, 452, 950. 00

   Fiscal year ending June 30              1930            1931                 1932            1933               1934


Cost ofnew work .                --------------
                          ..------------                $151, 482. 80 ......................................
Cost of maintenance-----------. .       $128,522.15      138, 323.04    $233, 917. 28 $201, 703. 87 $118, 858. 21

      Total cost-_ -- _--------          128, 522. 15    289, 805. 84     233, 917. 28        201, 703. 87        118, 858. 21

Total expended------------------         155, 232. 12    285, 244. 70      217, 733. 00       214, 997. 08        142, 906. 21
Allotted---------------------            160, 000. 00    325, 000. 00   --------------        228, 000. 00        286, 000. 00


Balance unexpended July 1, 1933-------------------------------$54, 973. 69
Amount allotted from War Department Appropriation
   Act approved Apr. 26, 1934------------------------ $161, 000. 00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933---------------------                                            125, 000. 00
                                                                                                             286, 000. 00

      Amount to be accounted for--------------------------_                                                  340, 973. 69
Gross amount expended                                                                                              906. 21
                                                                                                             1------------------------------

      Balance unexpended June 30, 1934------------------------198, 067. 48
Outstanding liabilities June 30, 1934------------------------------ 668. 22

         Balance available June 30, 1934-----------__                                                        197, 399. 26

   1 In addition, $60,000 of contributed funds were expended.
242      REPORT OF CHIEF           OF ENGINEERS,      U.   S.   ARMY,    1934

Amount (estimated) required to be appropriated for completion
of existing project 1_______-_____--------                   $68, 000. 00

Amount that can be profitably expended in fiscal year ending June
                              1
  30, 1936, for maintenance            ------------                 --     200, 000. 00

6. INLAND WATERWAY FROM DELAWARE RIVER TO CHESAPEAKE
                               BAY, DEL. AND MD.

   Location.-The Chesapeake and Delaware Canal is a sea-level
canal, extending from Reedy Point on the Delaware River, about 41
miles below Philadelphia, Pa., to the junction of Back Creek and
Elk River, about 4 miles west of Chesapeake City, Md., a distance of
about 19 miles, with a branch channel extending from Delaware
City, Del., for a distance of 1.8 miles to the junction with the main
canal from Reedy Point, Del. (See U. S. Coast and Geodetic Survey
Charts Nos. 294 and 1226.)
   Previous projects.-None. The River and Harbor Act of August
8, 1917, made appropriation for preliminary studies with a view to,
taking over the Chesapeake and Delaware Canal. The total cost and
expenditures were $1,604.12.
   Existing project.-This provides for the purchase of the Chesa-
peake and Delaware Canal at a cost to the United States not exceed-
ing $2,514,289.70; its enlargement, following the original route, ex-
cept for about 1 mile at the eastern end, to a sea-level canal 12 feet
deep at mean low water and 90 feet wide, with an approach at the
Delaware River end 150 feet wide, protected by two jetties; a channel
in Back Creek 12 feet deep at mean low water and 150 feet wide,
including the elimination of sharp bends; a. branch channel 6 feet
deep at mean low water and 36 feet wide, following the old route at
the eastern end; the construction of highway bridges across the canal
at Delaware City, Reedy Point, St. Georges, and Summit, Del., and
Chesapeake City, Md.; the construction of a railroad bridge across
the canal at Canal Station, Del.; the construction of a fixed bridge,
with necessary approaches, on route 2 (across upper Back Creek) in
lieu of the drawbridge farther down the creek, and for dredging an
anchorage and mooring basin with a depth of 12 feet in the lower
section and 6 feet in the upper section, and construction of a wharf
on Government property in Back Creek; the construction of a high-
way on the south side of the canal from Bethel to Chesapeake City,
Md., and paving of two sections of highway on the north side from
the Delaware-Maryland line to the State highway at Chesapeake
City, aggregating about one-half mile in length. The construction
of the highways on the north and south sides of the canal is condi-
tioned on local interests releasing the United States from all obliga-
tions arising from the removal of the pivot bridge and the con-
struction of a highway bridge across the canal at Bethel, Md., or a
ferry at that point, and to maintain the highways. The construction
of the anchorage and mooring basin in Back Creek and the fixed'
highway bridge and approaches across Back Creek is conditioned on
local interests relieving the United States from any obligations aris-
ing from the removal of the drawbridge, providing all necessary
rights-of-way for the new road and bridge, and agreeing to maintain
the new road and bridge.
  'Exclusive of available funds.
        RIVERS AND HARBORS-PHILADELPHIA,         PA.,   DISTRICT   243
   The jetties are rubble mounds on fascine mattresses 650 feet apart
at the shore ends and flaring to 800 feet apart at their outer ends.
The. north jetty is 1,460 feet long and the south jetty is 1,320 feet
long. The length of the canal included in the project is about 21
miles.
    The mean range of tide at Reedy Point Jetties is 5.2 feet, and at
Chesapeake City, Md., 2.2 feet. The extreme range of tide is from
3.9 feet above mean high water to 2.2 feet below mean low water.
    The estimate of cost for new work, revised in 1930, was $9,500,000.
    The existing project was adopted by the River and Harbor Act of
March 2, 1919 (H. Doc. No. 196, 63d Cong., 1st sess.), and modified

-3,
by the River and Harbor Acts approved January 21, 1927, and July
    1930. The act of January 21, 1927, provided for construction of
roadways on the north and south sides of the canal. The act of July
3, 1930, provided for the construction of two sections of roadway,
aggregating about one-half mile in length on the north side of the
-canal; for the dredging of an anchorage and mooring basin in Back
Creek, Md.; and for the construction of a fixed highway bridge in
lieu of the present drawbridge across Back Creek, Md. (Rivers and
Harbors Committee Doc. No. 41, 71st Cong., 2d sess., and S. Doc. No.
151, 71st Cong., 2d sess.). The latest published map of the canal is
found in Rivers and Harbors Committee Document No. 24, Seventy-
third Congress, second session. Rivers and Harbors Committee
Document No. 41, Seventy-first Congress, second session, contains a
map showing the proposed anchorage and mooring basin, etc., in
Back Creek, and Senate Document No. 151, Seventy-first Congress,
second session, contains a map showing roads built by the United
:States on the north and south sides of the canal from Bethel to
Chesapeake City, Md.
    Recommended modifications of project.-Under date of December
:31, 1931, the Chief of Engineers recommended modification of the
,existing project so as to provide for the Delaware. City branch a depth
,of 8 feet and a width of 50 feet; for deepening the existing basin
to the same depth; for revetting both banks east of Fifth Street
  3ridge; and for the construction of 200 feet of bulkhead on the
south bank, at an estimated cost of $67,000, with $20,000 annually for
maintenance (H. Doc. No. 201, 72d Cong., 1st sess.).
    Under date of July 31, 1933, the Chief of Engineers recommended
modification of the existing project so as to provide for the enlarge-
ment of an anchorage and mooring basin in Back Creek, to afford an
area about 400 feet wide and 1,000 feet long, with a depth of 12 feet,
and to provide sluice gates at the fixed bridge at the head of the
basin, at an estimated cost of $58,000 for new work, with no increase
in the estimated annual cost of maintenance (Rivers and Harbors
'Committee Doc. No. 18, 73d Cong., 2d sess.).
    Under date of December 6, 1933, the Chief of Engineers recom-
mended modification of the existing project so as to provide for a
channel at sea level to accommodate vessels drawing 25 feet and
having a depth of 27 feet and a width of 250 feet from Delaware
River to Elk River, and thence 400 feet wide down Elk River
  and Chesapeake Bay to deep water at or near Pooles Island, at an
estimated cost of $12,500,000, with $200,000 annually for maintenance
  and operation in addition to that now required (Rivers and Har-
bors Committee Doc. No. 24, 73d Cong., 2d sess.).
244    REPORT OF CHIEF OF ENGINEERS,      U.   S.   ARMY,   1934

   Local cooperation.-Complied with.
   Terminal facilities.-A freight station is maintained at Chesapeake
City by the Baltimore & Philadelphia Steamboat Co., no charges for
wharfage being made. Ample mooring facilities at the eastern and
western ends of the canal and bulkheads at Delaware City and St.
Georges have been constructed by the United States. A harbor for
small boats has been provided and a wharf has been constructed at.
Chesapeake City. The facilities are considered adequate for exist-
ing commerce.
   Operations and results during fiscal year-Newo Work.-Opera-
tions under contract dated February 6, 1933, for the construction of
a highway bridge across the branch channel at Delaware City, in
progress at the beginning of the fiscal year, were continued and pro-
visionally accepted as completed on January 20, 1934, at a total cost
of $72,124.11. The cost during the fiscal year was $51,368.04.
   Operations for the construction of a wharf at Chesapeake City,,
Md., in progress at the beginning of the fiscal year were completed
August 30, 1933, at a total cost of $28,419.08.. The cost during the
fiscal year was $12,107.18.
   Other new-work costs during the year included additional pay-
ment by Treasury settlement on account of changed conditions and
damage to dredging machinery for contract work in connection with
the widening of the channel at Chesapeake City, Md., in the amount
of $12,740.60; and preliminary plans and surveys amounting to
$601.97. The total cost of new work during the fiscal year was
$76,817.79.
   Maintenance dredging at a point west of the Pennsylvania Rail-
                                                     4,
road bridge and at Chesapeake City, by dredge No. leased from the
Delaware Dredging Co., was commenced June 13, 1934, and was in
progress at the end of the fiscal year. During this period 15,660
cubic yards were removed at a cost of $6,556.80.
   The U. S. dredges Mantua and Gillespie were employed at inter-
vals throughout the fiscal year in restoring the channel at the Reedy
Point entrance to the canal, removing 421,637 cubic yards at a cost
of $50,716.75. During the periods July 1 to August 25, and Novem-
ber 10 to December 2, 1933, the dredge Mamtua was engaged in
dredging the harbor and Engineer Basin at Chesapeake City, re-
moving 117,129 cubic yards at a cost of $22,410.89. During the
period December 3 to December 20, 1933, the dredge Mantua removed
42,729 cubic yards from Back Creek at a cost of $5,210.53. During
the period June 14 to the end of the fiscal year, the dredge Mantua
was engaged in restoration of the channel in the Delaware City
Branch Channel, removing 34,110 cubic yards at cost of $5,465.15.
   The U. S. dredge Gillespie was engaged from November 1 to De-
cember 4, 1933, in dredging a diversion cut across the upper end of
Reedy Island Shoal to reduce future maintenance costs, removing
420,187 cubic yards at a cost of $23,806.88. During the periods
December 20, 1933, to January 28, 1934, and April 22 to May 4, 1934,
the dredge Mantua was employed in dredging miscellaneous shoals
at various locations in the canal, removing 64,603 cubic yards at a
cost of $15,788.67.
        RIVERS AND HARBORS-PHILADELPHIA,                    PA.,   DISTRICT        245

   The U. S. derrick boat No. 37 was employed during the fiscal year
dredging miscellaneous shoals at various locations in the canal,
removing a total of 94,496 cubic yards at a cost of $36,094.68.
   The work of grading the north bank at Summit by U. S. dragline
No. 5, in progress at the beginning of the fiscal year, was continued
to completion on June 8, 1934. Approximately 70,616 cubic yards of
material were removed at a cost of $15,911.75. In connection with
this work, approximately 2,146 square yards of sodding, together
with necessary drainage facilities were completed at a cost of
$3,361.88.
   During the year repairs were made to the North Side Dike. Ap-
proximately 30,605 cubic yards of earthwork, 6,850 linear feet of
revetment, and 1,082 square yards of sodding were completed at a
cost of $16,044.21. Rebuilding of this dike, designed to prevent ero-
sion during storm tides, was in progress at the end of the year,
approximately 1,344 linear feet being completed at a cost of $5,615.49.
   Other maintenance work included miscellaneous operations, such
as removal of miscellaneous obstructions to navigation and debris by
derrick boat No. 37; repair and maintenance of revetment at points
along the canal; preliminary plans and surveys in connection with
proposed contract for fencing boundary lines; and repair and main-
tenance of auxiliary works, including dolphins, boardwalks, and
channel markers, etc., at a total cost of $45,105.24. Miscellaneous sur-
veys and examinations were made during the fiscal year at a cost of
$25,722.68. The total cost of the above maintenance work was $277,-
811.60. Total cost of all permanent work was $354,629.39. The
total expenditures were $298,041.05.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1934. The controlling depth on June 30, 1934, was 10 feet
at mean low water (Delaware River datum), but b oats drawing 12
feet were using the waterway without material difficulty by taking
advantage of the tides. The controlling depths in the Delaware City
Branch Channel were as follows: From Delaware River to Fifth
Street Bridge, 6 feet; and thence to the junction of the new canal,
1.5 feet. The costs of the existing project, including $2,514,289.70
for purchase of the canal, were $10,703,100.89 for new work and
$3,234,026.52 for maintenance, a total of $13,937,127.41. The total
expenditures were $14,375,117.80.
   Proposed operations.-It is proposed to apply the funds unex-
pended and accounts receivable June 30, 1934, amounting to
$230,853.41, as follows:
Accounts payable June 30, 1934__--------------------                        $40, 418. 60
Maintenance :
    Maintenance   dredging   as   required   from   Reedy
     Point to Back Creek and in Delaware City
     Branch Channel with Government plant through-
     out the year--------------------------------$135, 000.            00
    Maintenance dredging in canal as required by con-
      tract--------------------------------------     25, 000.         00
    Repairs to North Side Dike_---------------------  10, 000.         00
    Miscellaneous maintenance and repair, including
     repairs to banks, and removal of obstructions
     from canal---                              ___   20, 434.         81
                                                                            190, 434. 81
      Total-------------------------------      -------------------         230, 853. 41
246         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                               1934

  Maintenance dredging will be continued with the pipe-line dredge
Mantua and derrick boat No. 37 and attendant plant throughout the
year except during the winter lay-up, when annual repairs will be
made. Additional dredging to secure maintenance of full width
and depth throughout the project will be done by contract as re-
quired. Raising of the North Side Dike will prevent erosion during
storm tides. Miscellaneous repairs to banks, dolphins, board walks,
and other structures will be-made as required throughout the fiscal
year.
   The sum of $300,000 can be profitably expended during the fiscal
year 1936, as follows:
Maintenance:
   Extension of North Side dike to St. Georges----------                      $10, 000
   Dredging Reedy Point entrance channel and Delaware City Branch
      Channel with Government plant -------------                  ---------- 100, 000
   Maintenance dredging in canal by dredge Mantua and attendant
      plant      ----------------------------------------------                95, 000
   Removal of scattered shoals by derrick boat No. 37 and attendant
      plant-------------------__                 ----------------------------- 45, 000
   Miscellaneous maintenance and repair, including removal of ob-
      structions and repairs to dolphins and channel markers-------- 50, 000

            Total          ---------------------------------------------                                    300, 000

                                       Cost and finanoial summary

Cost of new work to June 30, 1934----------------------                                         $10, 704, 705. 01
Cost of maintenance to June 30, 1934------ -------------                                         13, 234, 026. 52

      Total cost of permanent work to June 30, 1934                            ---------            13, 938, 731. 53
Value of plant, materials, etc., on hand June 30, 1934                         ----------               466, 224. 84

      Net total cost to June 30, 1934---------------------14, 404, 956. 37
Plus accounts receivable June 30, 1934-----------------------  12, 184. 15

      Gross total costs to June 30, 1934                                                                417, 140. 52
                                                                                                    1--------------------4,
Minus accounts payable June 30, 1934--------------------                                                  40, 418. 60

     Net total expenditures----------------------------                                             14, 376, 721.92
Unexpended balance June 30, 1934-------------------------                                               218, 669. 26

         Total amount appropriated to June 30, 1934 -----------                                     14, 595, 391. 18

    Fiscal year ending June 30             1930            1931              1932            1933             1934


Cost of new work.--------------          $73, 776. 48    $98, 620. 94      $76, 488. 19   $166, 781. 10      $76, 817. 79
Cost of maintenance-------------         122, 202. 24    288, 275. 00      204, 800. 06    261, 193. 72      277, 811. 60

      Total cost--------------           195, 978. 72    386, 895.94       281, 288. 25   427, 974. 82       354, 629. 39
Total expended----------------           252, 221. 95    435, 072. 51      311, 458. 67   434, 421. 25       298, 041. 05

Allotted...--- ---------------------
                         ..     ...      477, 444. 55    490, 000. 00   -355, 000. 00     377, 334. 84       452, 843. 47


Balance unexpended July 1, 1933--------------------------- $63, 866. 84
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934------------------    $173, 880.00
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933--------------------    293, 000. 00
                                                                466, 880. 00
                                                                -----

                                       _530,
         Amount to be accounted for.-------------_                                                             746. 84
   1Increase adjustment of $2,154.08 made in cost of completed work prior to current
flscal year.
         RIVERS AND HARBORS-PHILADELPHIA,               PA., DISTRICT            247
Deductions on account of revocation of allotment-----------------_        $14, 036. 53
      Net amount to be accounted for .             _________---------_    516, 710. 31
Gross amount expended_____________________________ -$394, 679. 29
Less :
    Reimbursements collected___,________ $96, 461. 34
    Receipts from sales                       176.90
                                                      96, 638. 24
                                                                          298, 041. 05

      Balance unexpended June 30, 1934__ -__          -_______-_____218,
                                                                       669. 26
Outstanding liabilities June 30, 1934________________    41, 635. 17
Amount covered by uncompleted contracts_____________        29, 677. 49
                                                                           71, 312. 66

      Balance available June 30, 1934___________ ___________147, 356. 60
                                 ---------------------------
Accounts receivable June 30, 1934__                           12, 184. 15

      Unobligated balance available June 30, 1934 --. ________--  159, 540. 75
Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1_____________________-__________      300, 000.00

7. OPERATING AND CARE OF INLAND WATERWAY FROM DELAWARE
               RIVER TO CHESAPEAKE BAY, DEL. AND MD.

   The improvement forms the project for inland waterway from
Delaware River to Chesapeake Bay, Del. and Md. (See pp. 242-247.)
The canal has been operated and maintained under the permanent
indefinite appropriation since August 13, 1919.
   Operations and results during fiscal year.-The canal was open to
navigation throughout the year, except during a few days in Feb-
ruary 1934 when traffic was delayed on account of ice conditions. The
lift spans of the Government highway bridges at Chesapeake City,
Summit, St. Georges, and Reedy Point were lifted 7,054, 195, 6,128,
and 6,550 times, respectively. The new bascule highway bridge over
the Delaware City Branch Channel, which was ready for operation in
May 1934, was lifted 38 times during the remainder of the fiscal year.
The Pennsylvania Railroad bridge was operated by the railroad com-
pany throughout the year. During the fiscal year ending June 30,
1934, 9,041 vessels of various types passed through the canal. The
total cost was $99,061.20 for maintenance. The total expenditures
were $92,413.02.
   Condition at end of fiscal year.-The canal was purchased by the
United States in August 1919 at a cost of $2,514,289.70. The con-
trolling depth on June 30, 1934, was 10 feet at mean low water
 (Delaware River datum), but by taking advantage of the tide under
direction of the dispatching system boats drawing 'as much as 12
feet were navigating the waterway without excessive delay. The
controlling depths at mean low water in the Delaware City Branch
Channel were as follows: From Delaware River to Fifth Street
bridge, 6 feet; and thence to the junction of the new canal, 1.5 feet.
The total cost to date of operation, maintenance, repairs, etc., was
$2,408,381.94. The total expenditures were $2,398,487.13.
   Proposed operations.-The canal will be operated and maintained,
highway bridges operated, and traffic control maintained under allot-
ments from appropriations made available for such purposes.

1 Exclusive of available funds.
248           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                              1934

                                           Cost and financial summary

Cost of maintenance to June 30, 1934---___--------    - -- ___-$2, 408, 381.94
Plus accounts receivable June 30, 1934_.----_-------------     -     1, 418. 74

     Gross total costs to June 30, 1934--__--     _____----                                           2, 409, 800. 68
Minus accounts payable June 30, 1934----------------------                                                11,313. 55

     Net total expenditures __-.-----_-------------                                                   2, 398, 487. 13
Unexpended balance June 30, 194 ---------------------------                                               18, 244. 14

            Total amount appropriated to June 30, 1934 ------------                                   2, 416, 731. 27

   Fiscal year ending June 30                  1930            1931            1932           1933            1934


Cost of new work__                  ---         -----------------------------------------------------
Cost of maintenance- .--......      _       $105, 395. 37   $127, 982. 07   $113, 880. 29   $93, 617. 08     $99, 061. 20
Total expended-.....__   ....        ..      105, 900. 28    111, 301. 37    136, 618. 22    96, 781. 06      92, 413. 02
Allotted_                         ----
                         .--------------      95, 000. 00    143, 500. 00    110, 000. 00    87, 964. 72     104, 251. 73


Balance unexpended July 1, 1933______ ______-_______-------       $6, 405. 43
Amount allotted from permanent indefinite appropriation, sec. 6,
River and Harbor Act, Mar. 3, 1909----------------------        105, 000. 00

      Amount to be accounted for--__-__- - __-___                 111, 405. 43
Deductions on account of revocation of impounded funds-----------      748. 27

      Net amount to be accounted for-___________  __-__-__-_110, 657. 16
Gross amount expended------------------------- $92, 491. 93
Less reimbursements collected------------------------   78. 91
                                                                                                           92, 413. 02
      Balance unexpended June 30, 1934 ----------------------                                              18, 244. 14
Outstanding liabilities June 30, 1934_____________________________                                         13, 945. 74

     Balance available June 30, 1934 _____     _________________                                            4, 298.40
Accounts receivable June 30, 1934 ______________________     __                                             1, 418. 74

     Unobligated balance available June 30, 1934________________                                            5, 717. 14
Amount allotted for fiscal year 1935 ____----_----____                                                     97, 000. 00
            Balance available for fiscal year 1935______________________ 102, 717. 14

                                           8. SMYRNA RIVER, DEL.

   Location.-This stream, formerly Duck Creek, rises on the Mary-
land-Delaware divide, flows 15 miles along the boundary line be-
tween New Castle and Kent Counties, Del., and empties into the
Delaware Bay, about 57 miles below Philadelphia, Pa. (See U. S.
Coast and Geodetic Survey Chart No. 294.)
  Previous projects.-Adopted by acts of June 14, 1880, August 11,
1888, June 13, 1902, and March 3, 1905. The cost and expenditures
were $55,084.78 for new work and $22,722.85 for maintenance, a total
of $77,807.63. For further details see page 1786, Annual Report for
1915.
  Existing project.-This provides for a channel 7 feet deep at mean
low water, 100 feet wide across the bar outside the mouth, and 60
         RIVERS AND HARBORS-PHILADELPHIA,               PA.,   DISTRICT     249
feet thence to Smyrna Landing, a distance of 10 miles, including
three cut-offs which shortened the distance 1.2 miles, and the per-
manent protection of the .channel across the bar outside the mouth
by stone-filled, pile, and timber-crib jetties. The north jetty is 803
feet long, and the projected length of the south jetty is 2,700 feet.
The mean range of the tide at the mouth is 6 feet, at Flemings Land-
ing, about halfway up the river, 4.2 feet, and at Smyrna Landing,
the head of navigation, 31/2 feet. The extreme range of tide is from
1 foot below mean low water to 2 feet above mean high water. The
estimate of cost for new work, revised in 1928, is $150,000, exclusive
of amounts expended on previous projects. The latest (1928) ap-
proved estimate for annual cost of maintenance is $3,000.
   The existing project was adopted by the River and Harbor Act
of June 25, 1910 (HI. Doc. No. 815, 60th Cong., 1st sess.). The latest
published map is in that document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are nine wharves and landings of pile
and timber construction. The terminals are adequate for existing
commerce.
   Operations and results during fiscal year.-Maintenance dredging
between Prices Landing and Smyrna Landing, under contract, was
commenced April 16 and completed May 23, 1934. A total of 32,616
cubic yards of material was removed resulting in a channel 6 feet
deep and 50 feet wide. The cost of the work was $8,418.27 for
maintenance. Preliminary surveys and plans in connection with
this conrtract amounted to $1,042.56 for maintenance.
   The total cost was $9,460.83, all for maintenance. The total ex-
penditure was $9,455.19.
   Condition at end of fiscal year.-About 53 percent of the existing
project has been completed. The uncompleted portion of the project
includes the construction of the south jetty extending its length from
1,204 feet to 2,700 feet and the improvement of the channel to project
dimensions for a short distance in the upper section of the river near
Smyrna Landing.
   The controlling depths at mean low water on June 8, 1934, were
as follows: From Delaware Bay to the mouth, 4.8 feet; thence to
Prices Landing, 4.3 feet; and thence to Smyrna Landing, 7 feet.
   The costs were $80,302.05 for new work and $63,322.74 for mainte-
nance, a total of $143,624.79. Total expenditures have been
$143,619.15.
   Proposed operations.-It is proposed to apply the funds unex-
pended on June 30, 1934, amounting to $544.81, as follows:
Accounts payable June 30, 1934----- -------------------------------        $5. 64
Maintenance:
    Channel examinations and surveys throughout the fiscal year- ...      539.17
      Total ------------------------------------------------------        544. 81
  The sum of $18,000 can be profitably expended during the fiscal
year 1936 for maintenance dredging of the entrance channel and the
shoals within the river to Prices Landing, about 70,000 cubic yards,
by contract (July-November 1935).
250          REPORT        OF     CHIEF OF ENGINEERS,                                      U.         S.     ARMY,     1934

                                      Cost and financial summary
Cost of new work to June 30, 1934__------------------         $135, 386. 83
Cost of maintenance to June 30, 1934 --  ____-----------------86, 045. 59

      Total cost of permanent work to June 30, 1934----------                                                               221, 432. 42
Minus accounts payable June 30, 1934_____-------5.                                                                                    64

     Net total expenditures _____________------221,                                                                                426. 78
Unexpended balance June 30, 1934_---
                                  ............                                                        ---------       __           544. 81
           Total amount appropriated to June 30, 1934__------____                                                           221, 971. 59

           Fiscal year ending June 30                        1930                  1931                1932          1933           1934


Cost of new work-.................                ..............................
Cost of maintenance-__--                     .
                                ____ _____-.__.        ...            ..    ...       ... -      ..
                                                                                                ---        _--    $13, 163.96      $9, 460.83

Total expended          --------------------------                         --------------------                   $13, 163.96      $9, 455. 19
Allotted                                                                     .......
                  ..........--------------------------------- ------------ ------------ 13, 163.96                                 10, 000. 00


Amount allotted from War Department Appropriation Act approved
  Mar. 4, 1933    ------------------------------------------   $10, 000. 00
Gross amount expended ________----_                              9, 455. 19

      Balance unexpended June 30, 1934____-________----___----                                                                     544. 81
Outstanding liabilities June 30, 1934  ------------------------                                                                    -5. 64

           Balance available June 30, 19834                          -----------------                                             539. 17

Amount (estimated) required to be appropriated for completion of
existing project             -----------------                                                                                 52, 000. 00

Amount that can be profitably expended in fiscal year ending June
                                                              -
30, 1936, for maintenance 1                                                                                                    18, 000. 00
                                        9. LITTLE RIVER, DEL.
  Location.- Rises in Kent County, Del., flows easterly 7 miles, and
empties into Delaware Bay about 32 miles above Cape Henlopen.
(See U. S. Coast and Geodetic Survey Chart No. 1218.)
  Existing project.-This provides for a channel 5 feet deep at mean
low water from the 5-foot contour in Delaware Bay to the bridge at
Little Creek Landing, 3 miles above the mouth, 60 feet wide across
the bar outside the mouth, and 40 feet wide in the river, including
several cut-offs to eliminate sharp bends, and which shortened the
distance about half a mile. The mean range of tide at the mouth
is 5.1 feet and at Little Creek Landing 5.2. The extreme range of
tide is from 2 feet below mean low water to 1 foot above mean high
water.
   The estimate of cost for new work, made in 1912, was $14,000.
The latest (1928) approved estimate for annual cost of maintenance
is $3,000.
   The existing project was adopted by the River and Harbor Act
of July 25, 1912 (H. Doc. No. 626, 62d Cong., 2d sess.). There is no
published map of the river.
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are three pile and timber wharves or
landings on this stream. The terminal facilities are considered ade-
quate for the existing commerce.
   1 Exclusive of available funds.
              RIVERS AND               HARBORS-PHILADELPHIA,                                PA.,      DISTRICT                    251

   Operation and results during fiscal year.-Maintenance dredging
under contract was commenced December 4, 1933, and completed
April 11, 1934. A channel 5 feet deep at mean low water, 60 feet
wide from the 5-foot curve in Delaware Bay across the flats to the
mouth of the river, thence 40 feet wide to the highway bridge at
Little Creek Landing was obtained, 51,655 cubic yards of mud, sand,
.and clay being removed. The cost of the work was $14,631.08 for
maintenance. Surveys and plans in connection with this contract
cost $368.92 for maintenance.
  The total cost and expenditures were $15,000 for maintenance.
   Condition at end of fiscal year.-The project was completed in
1914, at a saving of $1,984 under the estimated cost. The controlling
depths at mean low water on April 15, 1934, were as follows: From
Delaware Bay to the mouth, 6.3 feet, and thence to the highway
bridge at Little Creek Landing, 5.8 feet.
   The costs and expenditures were $12,015.86 for new work and
$46,020.59 for maintenance, a total of $58,036.45.
   Proposed operations.-No funds are available.
   The channel is considered to be in a satisfactory condition to meet
the needs of existing commerce. No funds can be profitably ex-
pended during the fiscal year 1936.
                                           Cost and financial summary

Cost of new work to June 30, 1934------------------------                                                   -       $12, 015. 86
Cost of maintenance to June 30, 1934------------------------46, 020. 59

      Total cost of permanent work to June 30, 1934-------------                                                         58, 036. 45
Net total expenditures----------------     ---------------------                                                         58. 036. 45
Total amount appropriated to June 30, 1934                    _                                                               036. 45
                                                                                                                         5,---------------

          Fiscal year ending June 30                        1930      /     1931            1932            1933                 1934


Cost of new work.......                                                                        ...      .   ..     ..        .     ...
Cost of maintenance__--.-------                ----- ------------ --------------------------------                  --            $15, 000

Total expended        .....---------------------------------------------------------------                                         15; 000
Allotted-------------------..............----------..----------------------------------------------------                          15, 000


Amount allotted from War Department Appropriation Act approved
  July 14, 1932--_ _....__________-___                    -   -     $15, 000.00
Gross amount expended--                -------------------------- _  15, 000. 00

                                         10. ST. JONES RIVER, DEL.

  Location.-Rises in the western part of Kent County, Del., flows
southeasterly 22 miles, and empties into Delaware Bay about 26
miles above Cape Henlopen. (See U. S. Coast and Geodetic Survey
Chart No. 1218.)
  Previous projects.--Adopted by act of March 3, 1881; modified in
1884 and again in 1889. The cost and expenditures were $54,590.20
for new work and $28,866.30 for maintenance, a total of $83,456.50.
For further details see page 1787, Annual Report for 1915.
  Existing project.-This provides for a channel 7 feet deep at mean
low water from Delaware Bay to Dover, 100 feet wide outside of the
mouth, about 1 mile in length, 50 feet wide from the mouth to Leb-
anon, a distance of 11 miles, and 40 feet wide thence to Dover, a
252        REPORT       OF   CHIEF OF ENGINEERS,                U.   S.   ARMY,     1934


further distance of 6 miles, the construction of 5,000 feet of jetty on
the north side of the entrance, and the dredging of 16 cut-offs to
shorten the distance and eliminate, sharp turns and bad shoals.
   The mean range of tide at the mouth is 41/2 feet, at Lebanon 2
feet, and at Dover 11/2 feet. The extreme range of tide is from 1
foot below mean low water to 2 feet above mean high water. The
estimate of cost for new work, revised in 1924, is $268,000, exclusive
of amounts expended on previous projects. The latest (1928) ap-
proved estimate for annual cost of maintenance is $5,000.
   The existing project was adopted by the River and Harbor Act
of June 25, 1910 (H. Doc. No. 1116, 60th Cong., 2d sess.). It was
modified by the River and Harbor Act of June 5, 1920, so as to
provide that no part of the appropriation shall be expended for the
excavation of any cut-off until a satisfactory title to the land re-
quired for the cut-off shall have been transferred to the United States
free of cost. The latest published map is in the above document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are three wharves and several landings
of pile and timber construction. The facilities are adequate for
existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-About 57 percent of the project
has been completed. To complete the project requires the construc-
tion of the jetty at the mouth and dredging in the upper end of the
improvement. The controlling depths at mean low water on June 4,
1934, were as follows: From Delaware Bay to the mouth, 2.9 feet;
thence to Barkers Landing, 4.7 feet; thence to Lebanon, 6 feet; and
thence to Dove Wharf, 4.9 feet. The costs and expenditures have
been $152,512.17 for new work and $14,787.83 for maintenance, a
total of $167,300.
   Proposed operations.-Nofunds are available.
   The sum of $18,000 can be profitably expended during the fiscal
year 1936 for maintenance dredging in the entrance channel, about
50,000 cubic yards, by contract (August-Octobei 1935).
                                 Cost and financial summary

Cost of new work to June 30, 1934______________________________                          $207, 102. 37
Cost of maintenance to June 30, 1934____________________________                             43, 654. 13

        Total cost of permanent work to June 30, 1934-------------                        250, 756. 50

Net total expenditures----------------------------------------                            250, 756. 50
Total amount appropriated to June 30. 1934----------------------                          250, 756. 50

        Fiscal year ending June 30           1930        1931         1932        1933           1934


Cost of new work----. --- ----------------------------------------- $25, 200 -                      -
Cost of maintenance----------------------------------------------
Total expended------       ------------------ -----------------------------        25, 200
Allotted------------------------------ ----------------------------------          25, 200


Amount (estimated) required to be appropriated for completion of
existing project-----      -     -   -         -     -    -     -     $116, 000
Amount that can be profitably expended in fiscal ending June 30, 1936,
for maintenance-      - _------
                              ---                                   -    18, 000
        RIVERS AND HARBORS-PHIILADELPHIA,                     PA., DISTRICT       253
                      11. MURDERKILL RIVER, DEL.

   Location.-Rises in Kent County, Del., flows northeasterly 19
miles, and empties into Delaware Bay about 25 miles above Cape
Henlopen. (See U. S. Coast and Geodetic Survey Chart No. 1218.)
   Existing project.-This provides for a channel 7 feet deep at mean
low water from Delaware Bay to Frederica, 150 feet wide across the
flats outside the mouth, a distance of about 1 mile, and 80 feet wide
inside the river to Frederica, a distance of about 71/ miles. The
mean range of tide is 4.8 feet at the mouth and 1.8 feet at Frederica.
The extreme range of tide is from 1 foot below mean low water to
2 feet above mean high water. The estimate of cost for new work,
revised in 1928, is $60,000. The latest (1928) approved estimate for
annual cost of maintenance is $5,000.
   This project was adopted by the River and Harbor Act of July 13,
1892 (H. Ex. Doc. No. 21, 52d Cong., 1st sess., and Annual Report
for 1892, p. 981.) The latest published map is in House Document
No. 1058, Sixty-second Congress, third session.
   Terminal facilities.-There are six wharves or landings of pile and
timber construction, all of which are privately owned. The facilities
are adequate for existing commerce.
   Operations and results during fiscal year.-Under contract for
maintenance dredging of the entrance channel work was commenced
April 5 and completed April 27, 1934, restoring the channel 60 feet
in width and 7 feet in depth through the shoal between the 7-foot
curve in the river and the 7-foot curve in Delaware Bay, a distance
of 4,500 feet, 26,465 cubic yards of mud, sand, and gravel being
removed. The cost of the work was $9,749.94 for maintenance. The
cost of surveys and preliminary plans in connection with this con-
tract amounted to $1,467.82 for maintenance.
   The total cost during the year was $11,217.76 for maintenance.
Total expenditures were $11,215.26.
    Condition at end of fiscal year.-About 63 percent of the project
has been completed. The remaining portion is the widening of the
channel across the flats and in the river, which at the present time is
not considered important. The controlling depths at mean low water
on June 5, 1934, were as follows: From Delaware Bay to the mouth,
6 feet; thence to Frederica, 5.7 feet.
    The costs were $180,600.22, of which $37,630.07 was for new
work and $142,970.15 for maintenance. Total expenditures were
 $180,597.72.
    Proposed operations.-It is proposed to apply the funds unex-
pended on June 30, 1934, amounting to $4,353.27, as follows:
Accounts payable June 30, 1934-------------------------------------    $2. 50
Maintenance: Surveys and channel examinations throughout the year- 4, 350. 77
      Total       -----------------------------------------                   4, 353.27
  The sum of $12,000 can be profitably expended during the fiscal
year 1936 for maintenance dredging at the mouth of the river, about
28,000 cubic yards, by contract (October-December 1935).
254          REPORT OF CHIEF OF ENGINEERS,                              U. S.          ARMY,      1934

                                     Cost and financial summary

Cost of new work to June 30, 1934------------------------------                                          $37, 630. 07
Cost of maintenance to June 30, 1934----------------------------                                         142, 970. 15
     Total cost of permanent work to June 30, 1934_-__ -____   180, 600. 22
Minus accounts payable June 30, 1934----------------------------      2. 50

     Net total expenditures-- ------  -----------------     180, 597. 72
Unexpended balance June 30, 1934----------------------------4, 353.27
           Total amount appropriated to June 30, 1934-----------------                                   184, 950. 99

   Fiscal year ending June 30           1930           1931               1932            1933                   1934


Cost of new work-.   --     .. .          .          ---------                       . . . . . ...
                                                                                   . --------------. . . . .
Cost of maintenance-------------       $7, 200. 06   $13, 949. 11       $10, 542. 50            $7. 64          $11, 217. 76

Total expended--.- __----               6, 879. 68    14, 500. 15        10, 544. 00             7. 64           11, 215. 26
Allotted              -                21, 000. 00    13, 500. 00 ------------------------               ---     13, 000. 00


Aalance unexpended July 1, 1933-----------                        $2, 568. 53
Amount allotted by War Department Appropriation Act approved
Mar. 4, 1933__________---------    ----------------------------- 13,000.00
      Amount to be accounted for------------------------------- 15, 568. 53
Gross amount expended---------------------------------------- 11, 215. 26
      Balance unexpended June 30, 1934--------------------------4, 353. 27
Outstanding liabilities June 30, 1934----------------___--------------- 2. 50

           Balance available June 30, 1934_--_-------------                                                    4, 350. 77

Amount (estimated)            required to be appropriated for completion of
   existing project 1___-------------------                         -                     ---              22, 300. 00

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1 ____________-----------------        12, 000.00
                                   12. MISPILLION RIVER, DEL.

   Location.- Rises on the boundary line between Maryland and Del-
aware, flows 15 miles in a general northeasterly direction between
Kent and Sussex Counties, and empties into Delaware Bay about 16
miles above Cape Henlopen. (See U. S. Coast and Geodetic Survey
Chart No. 1218.)
   Previous projects.-Adopted March 3, 1879, July 13, 1892, modi-
fied July 3, 1893, and March 2, 1907. The cost and expenditures were
$148,798.41 for new work and $61,172.42 for maintenance, a total of
$209,970.83. For further details see page 1786, Annual Report for
1915, and page 448 of Annual Report for 1918.
   Existing project.-This provides for a channel 6 feet deep at mean
low water from Delaware Bay to Milford, a distance of 14 miles, 80
feet wide from the 6-foot curve of Delaware Bay across the flats to
the mouth, protected by stone-filled pile and timber crib jetties along
the north and south sides, 2,996 and 5,850 feet long, respectively;
thence 60 feet wide in the river, with additional width at sharp
bends; and 4 cut-offs, 50 feet wide. The mean range of tide is 41/2
feet at the mouth and 3.4 at Milford. The extreme range of tide
is from 1 foot below mean low water to 2 feet above mean high water.
   SExclusive of available funds.
                RIVERS AND HARBORS-PHILADELPHIA,                                             PA.,     DISTRICT              255

The estimate of cost for new work, revised in 1921, was $87,050,
exclusive of amounts expended on previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $6,000.
   The existing project was adopted by the River and Harbor Act
of March 2, 1919 (H. Doc. No. 678, 62d Cong., 2d sess.). The latest
published map is in that document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are 14 wharves or landings of pile
and timber construction. The facilities are adequate for existing
commerce.
   Operations and results during fiscal year.-Maintenance dredging
under contract, in progress at the beginning of the fiscal year, was
completed August 19, 1933. There were removed during the fiscal
year 1934, 15,684 cubic yards, place measurement, of mud and sand,
restoring the entrance channel to project dimensions. The cost was
$4,704.96.
   Under verbal agreement for the removal of a shoal in the upper
river, work was commenced October 20 and completed October 31,
1933. During the period, 571 cubic yards of sand, clay, gravel, and.
silt were removed. The cost was $402.84.
   The total cost was $5,107.80 for maintenance and the total expendi-
tures were $7,746.79.
   Condition at end of fiscal year.--The project was completed in
1924.
   The controlling depths at mean low water on June 5, 1934, were
as follows: From Delaware Bay to the mouth, 4.5 feet; and thence
to Milford, 4.4 feet.
   The costs and expenditures were $87,249.89 for new work and
$80,008.62 for maintenance, a total of $167,258.51.
   Proposed operations.-It is proposed to apply the funds unex-
pended on June 30, 1934, amounting to $11,364.01, for maintenance
dredging covering the removal of channel shoals by contract (Sep-
tember-December 1934).
   The sum of $10,000 can be profitably expended during the fiscal
year 1936 in maintenance dredging at the mouth of the river, about
16,000 cubic yards, by contract (October-November 1935).
                                                   Cost and financial summary

Cost of new work to June 30, 1934_____________________                                                              $236, 048. 30
Cost of maintenance to June 30, 1934_________________________                                                        141, 181. 04

           Total cost of permanent work to June 30, 1934____________                                                377, 229. 34

Net total expenditures------------------------                                                                       377, 229. 34
Unexpended balance June 30, 1934------------------------------                                                        11, 364. 01

           Total amount appropriated to June 30, 1934                               ----------------                388, 593.35

    Fiscal year ending June 30                        1930            1931            1932             1933              1934

Cost of new work..------..................------      -.----........-.............
Cost of maintenance.........-------------            $4, 250. 64        $26, 220. 03 --------------   $3, 485. 80        $5, 107. 80
                                         470. 67 ---------
Total expended---............----.....---.---..........
                                       30(                                                               846. 81          7, 746. 79
                  -----------
Allotted-...---------......                          12, 500. 00     17, 970. 67 --------------
                                                                                   ......             10, 000. 00         9, 957. 61

           91536-ENG 1934-----17
256      REPORT OF CHIEF           OF ENGINEERS, U.   S. ARMY,    1934

Balance unexpended July 1, 1933---------------------------------- $9, 153. 19
Amount allotted from War Department appropriation act approved
  Apr. 26, 1934-------------------       ---------------------- 10, 000. 00

      Amount to be accounted for-------------         -------------    19, 153. 19
Deductions on account of revocation of allotment-- ---------------          42. 39

      Net amount to be accounted for-----------------------       1'9, 110. 80
Gross amount expended---------------------------        $7,772.03
Less reimbursements collected-------------------------      25.24
                                                                   7,746. 79

      Balance unexpended June 30, 194----------------         ------- 11, 364. 01
Amount that can be profitably expended in fiscal year ending June 30,
1936, for maintenance 1----------------------------------10,             000. 00

                         ,13. BROADKILL RIVER, DEL.

   Location.-This river rises in Sussex County, Del., flows north-
easterly 13 miles, and empties into Delaware Bay about 5 miles above
Cape Henlopen. (See Coast and Geodetic Survey Chart No. 1218.)
   Existing project.-This provides for the establishment of a per-
manent entrance by dredging a channel across Lewes Cape 150 feet
wide and 6 feet deep at mean low water from that depth in Dela-
ware Bay to the same depth in Broadkill River, a distance of about
one-half mile, and constructing a stone-filled pile and timber crib
jetty, 1,275 feet long, on the north side of the entrance; and thence
a channel 6 feet deep at mean low water with a least width of 40
feet, upstream to Milton, 103/4 miles above the new mouth.
   The mean range of tide is 41/2 feet at the mouth and 31/2 feet at
Milton. The extreme range of tide is from 1 foot below mean low
water to 2 feet above mean high water, except in very severe storms.
The estimate of cost for new work, made in 1905, was $68,330. No
estimate for annual maintenance has been made.
   This project was adopted by the River and Harbor Act of March
3, 1873 (Annual Report for 1872, p. 792 et seq.), and modified by the
River and Harbor Act of March 2, 1907, which provided for the
new mouth in accordance with report published in House Document
No. 214, Fifty-ninth Congress, second session. The latest published
map of the whole river is in the above document, and of the mouth
in House Document No. 128, Sixty-seventh Congress, second session.
   Terminal facilities.-There are four wharves of pile and timber
construction; the terminals are adequate for existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1913.
   The controlling depths at mean low water on June 6, 1934, were as
follows: From Delaware Bay to the mouth, 2.5 feet; thence to the
Tussocks, 4 feet; and thence to Milton, 2.8 feet.
   The costs and expenditures were $68,227.97 for new work and
$101,009 70 for maintenance, a total of $169,237.67.
   Proposed operations.--It is proposed to apply the funds unex-
pended on June 30, 1934, amounting to $7,500, to maintenance dredg-
ing covering the restoration of the entrance channel to project
dimensions by contract (July-September 1934).
  'Exclusive of available funds.
             RIVERS      AND HARBORS-PHILADELPHIA,                             PA.,   DISTRICT           257

  No funds can be profitably expended during the fiscal year 1936,
as it is believed that the restoration to project dimensions planned
during the fiscal year 1935, will provide for the needs of navigation
for a period of at least 2 years.
                                       Cost and financial summary

Cost of new work to June 30, 1934.                                                            $68, 227. 97
                                          -----
Cost of maintenance to June 30, 1934_-____-_                                                  101, 009. 70

           Total cost of permanent work to June 30, 1934__............                        169, 237. 67

Net total expenditures---__     ---------------------                                             169, 237. 67
Unexpended balance June 30, 1934                                                                    7, 500. 00

           Total amount appropriated to June 30, 1934-__------____                                176, 737. 67

   Fiscal year ending June 30             1930                1931      1932           1933            1934


Cost of new work.........                  .---------.-------------
                                         .----                                  ----------
                                                                      -------------    --- -__
Cost of maintenance...........--------   ------------------                                   -   --------
Total expended----------------------
Allotted              --------------------------------------------------------                        $7,500.00


Amount allotted from War Department Appropriation Act approved
  Apr. 26, 1934    ------------------------------------------  $7, 500.00
Balance unexpended June 30, 1934----------------------------7, 500. 00

14. INLAND WATERWAY FROM CHINCOTEAGUE BAY, VA., TO DELA-
             WARE BAY AT OR NEAR LEWES, DEL.

   Location.--This tidal waterway extends northerly from Chinco-
teague Bay, Va., following the waterways parallel with the Atlantic
Ocean through Virginia, Maryland, and Delaware, passing through
the neck of land at Ocean View, Del., and the land between Rehoboth
Bay and the headwaters of Lewes River, entering the Delaware Bay
at or near the town of Lewes, a total distance of about 70 miles.
 (See U. S. Coast and Geodetic Survey Charts Nos. 1218, 1219, and
1220.)
   Previous projects.-Adopted in 1886 and modified in 1892. The
River and Harbor Act of March 3, 1905, repealed the project. The
cost and expenditures on the project prior to its being repealed were
$168,411.88 for new work and $25,330.42 for maintenance, a total
of $193,742.30. For further details see page 382, annual report for
1932.
   Existing project.-This provides for the maintenance of the three
bridges built by the Government at Ocean View, Del., under the
previous project. The latest (1928) approved estimate for annual
cost of maintenance is $500. The project was adopted by the River
and Harbor Act of June 25, 1910 (H. Doc. No. 538, 59th Cong., 1st
sess.). The latest published map is printed in House Document No.
128, Sixty-seventh Congress, second session.
    Terminal facilities.-There are 29 wharves and a number of land-
ing places, all of which are open to the public use free of charge.
The terminals are adequate for the existing commerce.
258        REPORT OF CHIEF OF ENGINEERS,                                           U.   S.     ARMY,          19344


   Operations and results during fiscal year.--Repairs were made by
hired labor to the Cedar Neck and Jefferson Bridges at a cost of
$126.69 for maintenance. The total expenditures were $55.99.
   Condition at end of fiscal year.-As the project is for maintenance,
it is impracticable to state the percentage of completion. The.Cedar
Neck and Jefferson Bridges were recently repaired and placed in a
serviceable condition. The State of Delaware, in August 1928, com-
pleted a concrete bridge across this waterway as part of its highway
system from Ocean View to Bethany Beach. This bridge is 80 feet
south of the Government-owned Ocean View Bridge, which has
heretofore been maintained by the Government but which has now
been closed to highway traffic. The total cost was $10,110.09 for
maintenance. The total expenditures were $10,039.39.
   Proposed operations.-It is proposed to apply the funds unex-
pended on June 30, 1934, amounting to $660.61, as follows:
Accounts payable June 30, 1934--------------------------------$70. 70
Maintenance: Repairs to bridges throughout the year-------------- 589.91

        Total-----------------                                                          --------                        660. 61

  The sum of $500 can be profitably expended during the fiscal year
1936 for continuing annual maintenance of these bridges.
                                            Cost and financial summary

Cost of new work to June 30, 1934___          __-----------                                                      $168, 411. 88
Cost of maintenance to June 30, 1934 ------------------                                                         -35, 440. 51

      Total cost of permanent work to June 30, 1934-----------                                                      203, 852. 39
Minus accounts payable June 30, 1934_-.... ____--___        _-_                                                           70. 70

     Net total expenditures----     ------------------- -------                                                     203, 781.69
Unexpended balance June 30, 1934 -------------------------                                                               660. 61

        Total amount appropriated to June 30, 1934 -----                                                --          204, 442. 30

        Fiscal year ending June 30                             1930         1931             1932            1933        1934

Cost of new work....             ..-----------------
Cost of maintenance__---.-_----------------                               $1,132. 40          $36. 11        $114.89      $126.69
Total expended---------------- -----                          ------       1,132.40     34. 83  116. 17                     55.99
Allotted_ ---------- ---------------- $500.00                                800.00 ----------------- -                    300.00

Balance unexpended July 1, 1933__    _________          ________ $416.60
Amount allotted from War Department Appropriation Act approved
  Apr. 26, 1934-------------------------------- ------------------ 300. 00

      Amount to be accounted for ...__.,_    -       -___                                                                716.60
Gross amount expended-------------------------------------------                                                          55. 99
    Balance unexpended June 30, 1934_________--..... .____.           660. 61
Outstanding liabilities June 30, 1934--------------------------------  70. 70

        Balance available June 30, 1934.-----------------------------589. 91

Amount that can be profitably expended in fiscal year ending June
                                                       ,
   30, 1936, for maintenance 1- -                          _-_----    ___--_---__--                                      500. 00

   'Exclusive of available funds.
             RIVERS AND HARBORS-PHILADELPHIA,                                     PA.1 DISTRICT                259
                                          15. COOPER RIVER, N. J.
   Location.-Rises in the eastern part of Camden County, N. J., flows
northwesterly about 13 miles, passing through the northern part of
the city of Camden, and empties into the Delaware River above Cooper
Point. (See U. S. Coast and Geodetic Survey Chart No. 295.)
   Existing project.-This provides for a channel 12 feet deep at
mean low water and 70 feet wide through the bar outside of the
mouth and upstream to what was formerly Browning Chemical
Works, about 1.7 miles. The mean range of tide is 6 feet at the
mouth and 2 feet at Stoys Landing, and the extreme range is about
10 feet. The estimate of cost for new work, made in 1895, was
$35,000. The latest (1929) approved estimate for annual cost of
maintenance is $13,500.
   The project was adopted by the River and Harbor Act of June 3,
1896. (H. Doc. No. 176, 53d Cong., 3d sess., and Annual Report for
1895, p. 1102 et seq.) The latest published map is in House Docu-
ment No. 134, Sixty-third Congress, first session.
   Terminal facilities.-There are 17 wharves, which practically form
a continuous wharfage on both sides of the stream through the city
of Camden. (See Port Series No. 4, Corps of Engineers.)
   Operations and results during fiscal year.-None.
   Condition at end' of fiscal year.-The existing project was com-
pleted in 1920 at a saving of $1,898 under the estimated cost. The
controlling depths at mean low water on June 11, 1934, were 12.1
feet from the Delaware River to State Street Bridge, and thence 10.9
feet to the upper end of the project, with a variable width of channel.
The costs and expenditures were $33,101.64 for new work and
$93,203.41 for maintenance, a total of $126,305.05.
   Proposed operations.-It is proposed to apply the funds unex-
pended on June 30, 1934, amounting to $27,000, to maintenance dredg-
ing to restore project dimensions in the authorized channel through-
out its entire length, by contract (September 1934-February 1935).
   No funds can be profitably expended during the fiscal year 1936,
as it is believed that the restoration to project dimensions planned
during the fiscal year 1935 will insure a usable channel until the
fiscal year 1937.
                                              Cost and financial summnary
Cost of new work to June 30, 1934__-----                            __________________               $33, 101. 64
Cost of maintenance to June 30, 1934- ----                         __...----___                       93, 203..41
           Total cost of permanent work to June 30, 1934 ___--______                                 126, 305. 05

Net total expenditures--- -----                 ___                                   ----           126, 305. 05
Unexpended balance June 30, 1934--__----______-                                   -_____--       _    27, 000. 00
           Total amount appropriated to June 30, 1934______________ 153, 305. 05

           Fiscal year ending June 30                  1930          1931         1932   1933                1934


Cost of new work__---------
Cost of maintenance------------------                $1, 323. 45     $977. 28                          -     - -

Total expended.                 -----------           8, 183. 71    1, 805. 05
Allotted      .   . .   .   .     .   .   -          27, 000. 00 -25, 194. 95-    ---        -        -    $27, 000. 00

Amount allotted from War Department Appropriation Act approved
Apr. 26, 193---4       ------------------------------         $27, 000
     Balance unexpended June 30, 1934---------                  27, 000
260     REPORT OF CHIEF OF ENGINEERS,'           U.   S. ARMY,   1934

                      16. WOODBURY CREEK, N. J.

    Location.-This creek rises on the boundary line between Camden
and Gloucester' Counties and flows 6 miles in a general northwesterly
direction, emptying into the Delaware River about 9 miles below
Philadelphia, Pa. (See U. S. Coast and Geodetic Survey Chart INo.
295.)
    'Previousprojects.-Adopted by acts of August 2, 1882, and June
3, 1896. The total cost and expenditures were $2,950.31 for new
work. For further details see page 339, Annual Report for 1932.
    Existing project.-This provides for a channel 6 feet deep at mean
low water from the 6-foot contour of Delaware River to Woodbury,
60 feet wide across the bar outside the mouth and up the river to the
White Bridge, 1 miles; thence 40 feet wide to Woodbury, a farther
distance of 2 miles, including three cut-offs, which shortened the
distance 3,340 feet. The length of the section included in the project
is about 4 miles. The mean range of tide at the mouth is 5.7 feet
and at Woodbury 4.3 feet. The extreme tidal range is about 10 feet.
The estimate of cost for new work, made in 1912, was $38,000, exclu-
sive of amounts expended on previous projects. The latest (1928)
approved estimate for annual cost of maintenance is $4,000.
    The existing project was adopted by the River and Harbor Act
of March 4, 1913 (H. Doc. No. 635, 62d Cong., 2d sess.). The latest
published map is in that document.
    Local cooperation.-Fullycomplied with.
    Terminal facilities.-There are five timber wharves on this stream,
all being private property, except a municipal wharf at the foot of
one of the streets. The facilities are adequate for the existing
commerce.
     Operations and results during fiscal year.-None.
     Condition at end of fiscal year -The existing project was com-
pleted in 1916 at a saving of $13,857 under the estimated cost. The
controlling depths at mean low water on April 20, 1934, were as fol-
lows: Entrance channel at the mouth, 3.9 feet; thence to the red
bridge, 4.4 feet; and thence to the highway bridge at Woodbury,
3.3 feet. The costs and expenditures were $24,142.70 for new work
and $36,210.44 for maintenance, a total of $60,353.14.
     Proposed operations.-It is proposed to apply the funds unex-
pended on June 30, 1934, amounting to $10,000, to maintenance
'dredging to restore the channel to project dimensions, by contract
  (July-October 1934).
     No funds can be profitably expended during the fiscal year 1936,
as it is believed that the restoration to project dimensions during the
fiscal year 1935 will insure a usable channel until the fiscal year 1937.
                         Cost and financial summary

Cost of new work to June 30, 1934_______________________________     $27,093. 01
Cost of maintenance to June 30, 1934_________________--------         36,210. 44

      Total cost of permanent work to June 30, 1934_______________    63. 303. 45
et total expenditures                                                    303.45
                                                                      6------------------3,
Unexpended balance June 30, 1934_    _______-----------------_        10,000. 00
      Total amount appropriated to June 30, 1934-----------.---       73, 303. 45
              RIVERS AND HARBORS-PHILADELPHIA,                                                  PA., DISTRICT           261

           Fiscal year ending June 30                    1930              1931                1932    1933         1934


Cost of new work----                      ------------           ------------------------------
Cost of maintenance-----..    ------.--        -------     -----------                         --      $353.14
Total expended      ----     ---------------                        ------------------------            353.14      .      ..
Allotted     -----------------------------                 ---           --------              --       353. 14   $10, 000. 00


Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934-------    ---------------------------------                             $10, 000
     Balance unexpended June 30, 1934                      ___------------------------ 10, 000
                                          17. MANTUA CREEK, N. J.

   Location.-This creek rises in Gloucester County, N. J., flows
northwesterly 161/2 miles, and empties into the Delaware River about
10 miles below Philadelphia, Pa. (See U. S. Coast and Geodetic
Survey Chart No. 295.)
   Previous projects.-Adopted by act of August 2, 1882, and modi-
fied in 1889. The cost and expenditures were $3,000 for new work.
For further details see page 1784, Annual Report for 1915.
   Existing project.-This provides for a channel 12 feet deep at
mean low water and 100 feet wide from the 12-foot contour of
Delaware River, through the marsh to the phosphate works; thence
8 feet deep and 80 feet wide via cut-offs to Paulsboro; thence 7 feet
deep and 60 feet wide via cut-offs to Parkers Landing, near Mount
Royal; and the dredging of a cut-off 3 feet deep and 50 feet wide
9,000 feet above Berkley (Mount Royal), the removal of overhang-
ing trees above Mount Royal; the construction of stone-filled pile and
timber jetties on both sides of the mouth; and a dike across the
old mouth 524 feet long. The length of the north jetty is 1,578 feet.
The south jetty is 1,454 feet long. The section of the creek included
in the project extends from the Delaware River upstream 73/4 miles
to 1 mile below the town of Mantua. The mean range of tide at the
mouth is 5.2 feet; at Paulsboro, 5 feet; at Mount Royal, 4.6 feet; and
at Mantua, 3.5 feet. The extreme tidal range is about 10 feet. The
estimate of cost for new work, made in 1897, was $145,030, exclusive
of amounts expended on previous projects. The latest (1928)
approved estimate for annual cost of maintenance is $3,000.
   The existing project was adopted by the following river and harbor
acts: The act of March 3, 1899, provided for all features of the
project except the dike across the old mouth. (H. Doc. No. 123,
55th Cong., 2d sess., and Annual Report for 1898, p. 1122.) The dike
was provided for by the act of March 2, 1907. The latest published
map of the whole creek is with the project document. A later map
of the portion from just below Mount Royal to Mantua is in House
Document No. 523, Sixty-first Congress, second session, and a map
of the section between Delaware River and Friars Landing is printed
in Rivers and Harbors Committee Document No. 14, Seventy-third
Congress, first session.
   Recommended modifications of project.-Under date of June 3,
1933, the Chief of Engineers recommended modification of the
existing project so as to provide for a channel 12 feet deep at mean
low water and 100 feet wide from the Delaware River to the Strath-
mann sand plant at Paulsboro, about 2 miles above the mouth;
262       REPORT       OF CHIEF OF ENGINEERS,                U.   S. ARMY,     1934


thence 10 feet deep and 60 feet wide to Friars Landing, about 2,000
feet, at an estimated cost of $25,000, with $4,000 annually for
maintenance or $1,000 in addition to that now authorized, subject to
certain conditions of local cooperation. (Rivers and Harbors Com-
mittee Doc. No. 14, 73d Cong., 1st sess.)
  Local cooperation.-Fully complied with.
   Terminal facilities.-There are 10 wharves of pile and timber
construction on this stream.
   Operations and re'sults during fiscal year.--None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1927 at a saving of $35,000 under the estimated cost. The
controlling depths at mean low water on June 15, 1934, were as
follows: From the Delaware River to the phosphate works, 13.6 feet;
thence to the highway bridge at Paulsboro, 9.4 feet; thence to Berk-
ley (Mount Royal), 7.0 feet; and thence to Mantua, 1.8 feet. The
costs and expenditures were $109,958.52 for new work and $72,112.70
for maintenance, a total of $182,071.22.
  Proposed operations.--It is proposed to apply the funds unex-
pended on June 30, 1934, amounting to $5,000, to maintenance dredg-
ing to restore project dimensions in the channel between the Dela-
ware River and Paulsboro by contract (September-November 1934).
  No funds can be profitably expended during the fiscal year 1936,
as it is believed that the restoration to project dimensions planned
during the fiscal year 1935 will provide for the needs of navigation
for at least 2 years.
                               Cost and financial summary

Cost of new work to June 30, 1934 ---------------------------                        $112, 958.52
Cost of maintenance to June 30, 1934----------------------------                       72, 112. 70

       Total cost of permanent work to June 30, 1934------------                     185, 071. 22

     Net total expenditures  ------------------------------  185, 071. 22
Unexpended balance June 30, 1934----------------------------   5, 000. 00
       Total amount appropriated to June 30, 1934--------------                      190, 071.22

       Fiscal year ending June 30          1930       1931         1932       1933         1934


Cost ofnew work..........-----------------.. --.....
Cost of maintenance-- _- - -- -       $457. 11 $11, 864. 11-       --......
Total expended-------------------- ------------ 12, 321. 22
Allotted_---- ..----       ----            4,000.00 8,321.22 ----------------                 5,000
Amount allotted from War Department Appropriation Act approved
  Apr. 26, 1934---------------------------------------------      $5, 000
Balance unexpended June 30, 1934___------------------------------ 5, 000

                                    18. SALEM RIVER, N. J.

  Location.-Rises in Salem County, N. J., flows westward 10 miles,
thence southward 13 miles to the city of Salem, N. J., where it is
joined by Little Salem River, or Fenwick Creek, from the eastward,
and thence westward 3 miles, emptying into the Delaware River
about 45 miles below Philadelphia, Pa. (See U. S. Coast and Geo-
detic Survey Chart No. 294.)
        RIVERS AND HARBORS-PHILADELPHIA,         PA.,   DISTRICT   263
   Previous projects.-Adopted by act of 1870, modified in 1878, and
a subsequent project adopted March 2, 1907. The cost and expendi-
tures were $55,809.34 for new work and $48,000 for maintenance, a
total of $103,809.34. For further details see page 1784, Annual Re-
port for 1915, and page 349 of Annual Report for 1924.
   Existing project.-This provides for a channel 12 feet deep at
mean low water, 150 feet wide from deep water in the Delaware
River through Salem Cove, and thence 100 feet wide to the fixed
highway bridge in the city of Salem, including a cut-off to eliminate
a large horseshoe bend just below the city of Salem. The length
of the section included in the project is about 4 miles. The mean
range of tide is 6 feet, and the extreme range is from 1 foot below
mean low water to about 2 feet above mean high water.
   The estimate of cost for new work, revised in 1927, is $175,000
 (one-half of which is to be contributed by local interests), exclusive
of amounts expended under previous projects. The latest (1927)
approved estimate for annual cost of maintenance is $8,000.
   The existing project was adopted by the River and Harbor Act
of March 3, 1925 (H. Doc. No. 110, 68th Cong., 1st sess.). The latest
published map is in that document.
   Local cooperation.-The existing project requires that local inter-
ests contribute 50 percent of the estimated cost of new work and that
a right-of-way for the proposed cut-off shall be conveyed to the
United States free of cost. The contributions thus far made pro-
vides the right-of-way for the cut-off and for 50 percent of the cost
of the 12-foot channel up to a point 225 feet above the county (Penns
Neck) highway bridge, amounting to $51,825.10, of which $27,905.82
was contributed by the State of New Jersey, $19,932.73 by the county
of Salem, and $3,986.55 by the city of:Salem.
   Terminal facilities.-There are 13 wharves on the river, all at
Salem, N. J. The facilities are adequate for existing commerce.
   Opierations and results during fiscal year.-Maintenance dredging
under contract for the restoration of the channel to a depth of 11
feet at mean low water, 100 feet wide from the mouth of Little Salem
River upstream about 1,600 feet, thence 80 feet wide to the fixed
highway bridge, was commenced May 19 and completed June 29,
1934. A total of 120,417 cubic yards of mud, sand, and gravel were
removed and redeposited on the adjacent marsh. The cost of the
work was $19,491.63 for maintenance. The cost of preliminary plans
and surveys in connection with this contract amounted to $257.27 for
maintenance. The total costs were $19,748.90, all for maintenance.
Total expenditures were $6,110.37.
   Condition at end of fiscal year.-About 60 percent of the existing
project has been completed. The uncompleted portion of the project
includes the dredging of the section, commencing about 225 feet
above the county (Penns Neck) highway bridge to the fixed highway
bridge at Salem. The controlling depths at mean low water on
June 16, 1934, were as follows: From Delaware River across Salem
Cove, 9.6 feet; thence to lower end of the cut-off, 10 feet; thence to
Penns Neck bridge, 13.3 feet; and thence to the fixed highway bridge
at Salem, 11 feet.
264              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                                    1934

  The total costs of the work under the existing project are as
follows :
                                                                                                      United     Contrib-                   Total
                                                                                                    Statesfunds uted funds

New work--------------------------------------------$51,                                                  825. 09      $51, 825.10      $103, 650.19
Maintenance            ...                        ....-------------------------------------------      22, 923. 81       .------------ 22, 923.81
        Total.................--------------------------------------------74,                             748. 90       51, 825. 10        126, 574. 00


  The total expenditures were $61,110.37 United States funds, and
$51,825.10 contributed funds.
  Proposed operations.-It is proposed to apply the funds unex-
pended on June 30, 1934, amounting to $28,889.63, as follows:
Accounts payable June 30, 1934_------------------------------    $13,638.53
Maintenance :
    Maintenance dredging between Penns Neck Bridge
      and Delaware River----------------------- $13, 000.00
    Surveys and channel examination----------__  _    2, 251. 10
                                                                  15, 251. 10

            Total--------                          -------------------------------------                                               28, 889. 63
  No additional funds can be profitably expended during the fiscal
year 1936, as it is expected that the work contemplated will pro-
vide for the needs of navigation for about 2 years.
                                                       Cost and financial summary

Cost of new work to June 30, 1934__$1_________-----                                                           -          __ 1$107, 634. 43
Cost of maintenance to June 30, 1934_.________-----------                                                                      70, 923. 81

     Total cost of permanent work to June 30, 1934                                                      -----------                   178, 558. 24
                                          ______-
Minus accounts payable June 30, 1934_-- ----                                                                                  _        13, 638. 53

      Net total expenditures__________________                                                                                        164, 919. 71
Unexpended balance June 30, 1934  --------------------------                                                                           28, 889'. 63

            Total amount appropriated to June 30, 1934---__---                                                                        193, 809. 34

             Fiscal year ending June 30                                  1930               1931          1932             1933              1934


Cost of new work--.............................................................---------.
Cost of maintenance................-------------------.          $1, 593. 64 ----------------------------- $19, 748. 90
Total expended                 ............---------------------        1,593. 64 -_3...                          .-     ..       -    .     6, 110. 37
                                                                                                                                                      7...

Allotted..................------------------------..               -10,000. 00-----------                              ---------            35, 000.00


Amount allotted from War Department Appropriation Act approved
  July 14, 1932      ----------------------------------------- $35, 000. 00
Gross amount expended---____---           __----------_          6, 110. 37

     Balance unexpended June 30, 1934     _------------------                                                                          28, 889.63
Amount covered by uncompleted contracts--- -------------                                                                               13, 642. 53

              Balance available June 30, 1934____---                                         __------------                            15, 247.10

Amount (estimated) required to be appropriated for completion of
  existing project 2                                                                                                                   36. 000. 00

    1In addition, $51,825.10 expended from contributed funds for new work.
    SExclusive of available funds.
        RIVERS AND HARBORS-PHILADELPHIA,           PA.,   DISTRICT        265
                         19. COHANSEY RIVER, N. J.

   Location.-This river rises in Salem County, N. J., flows southerly
and southwesterly through Cumberland County 261/2 miles and
empties into the Delaware Bay about 62 miles below Philadelphia,
Pa. (See U. S. Coast and Geodetic Survey Chart No. 1218.)
  Previous projects.-Adopted by the River and Harbor Act of
March 3, 1873, and modified in 1879. The cost and expenditures
prior to the adoption of the existing project were $36,000 for new
work. For further details see page 1785, Annual Report for 1915.
   Existing project.-This provides for a channel about 2,000 feet
long through a neck of land at the mouth, 7 feet deep at mean low
water and 100 feet wide, from Delaware Bay to Cohansey River,
and for a channel 7 feet deep, 100 feet wide, from Stony Point to
Broad Street, Bridgeton, N. J., a distance of 6,000 feet; thence 75
feet wide to Commerce Street Bridge, a distance of 740 feet, and
thence 60 feet wide to the Nail Works Bridge, a distance of 900 feet.
Total length of the sections included in the project is 1.8 miles. The
mean range of tide is 51/2 feet at the mouth and 7 feet at Bridgeton.
The extreme range of tide is from 2 feet below mean low water to
3 feet above mean high water. The estimate of cost for new work,
made in 1905, was $55,800, exclusive of amounts expended under
previous projects.
   The latest (1928) approved estimate for annual cost of mainte-
nance is $4,000. The existing project was adopted by the River
and Harbor Act of March 2, 1907 (H. Doc. No. 645, 59th Cong., 1st
sess.) The latest published map is in that document.
  Local cooperation.-Fully complied with.
   Terminal facilities.-There are 23 wharves along this stream and
most of these have direct railroad connection.
   Operations and results during fiscal year.-Maintenance dredging
of the channel between Broad Street Bridge, in Bridgeton, and Stony
Point, under contract, was commenced April 4 and completed May
4, 1934. A total of 65,366 cubic yards of mud, sand, and gravel
were removed, restoring the channel to project dimensions. The
cost was $33,030.60, for maintenance. The cost of surveys and pre-
liminary plans in connection with this work amounted to $1,227.93,
for maintenance. The total cost was $34,258.53, all for mainte-
nance. The expenditures were $34,250.96.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1912 at a saving of $7,221 under the estimated cost. The
controlling depths at mean low water on June 22, 1934, were as
follows: From Delaware Bay to Stony Point, 8.7 feet; thence to
Broad Street Bridge, Bridgeton, 8 feet; -thence to Commerce Street
Bridge, 5.3 feet; and thence to the Nail Works Bridge, 2.2 feet. The
costs were $48,578.89 for new work and $91,779.64 for maintenance,
a total of $140,358.53. Total expenditures were $140,350.96.
   Proposed operations.-It is proposed to apply the funds unex-
pended on June 30, 1934, amounting to $3,749.04, as follows:
Accounts payable June 30, 1934-.-- ___________-------------____          $7. 57
Maintenance, surveys and channel examination-__--......__..___       3, 741. 47
      Total    _--   -    -   --    -   -   --       -        -_     3, 749. 04
266          REPORT OF CHIEF OF ENGINEERS,                                  U.    S. AR1VMY,        1934

  The channel is considered to be in a satisfactory condition to meet
the needs of existing commerce. No funds can be profitably ex-
pended during the fiscal year 1936.
                                   Cost and financial summary
Cost of new work to June 30, 1934--------------------------$84, 578. 89
Cost of maintenance to June 30, 1934                          1, 779. 64
                                                             9---------------------------

      Total cost of permanent work to June 30, 1934--------------176, 358. 53
Minus accounts payable June 30, 1934----------------------------        7. 57

     Net total expenditures                                           350. 96
                                                                1---------------------------76
Unexpended balance June 30, 1934-------------------------------    3, 749. 04
         Total amount appropriated to June 30, 1934------------__                                        180, 100. 00

          Fiscal year ending June 30                 1930            1931           1932          1933             1934


Cost of new work---------              ------------    -           ------------                                -    -
Cost of maintenance---------            ----------- ------------------------------------                      $34, 258. 53
Total expended ........                                                                              -         34, 250. 96
           .....--
Allotted---------------------------             .       ------------
                                                       ....                      ..----------
                                                                                 __ .          _
                                                                                              ------------     38, 000. 00


Amount allotted from War Department Appropriation Act approved
  July 14. 1932----------------------------------------------  $38,000. 00
Gross amount expended-----------------------------------        34, 250. 96
         Balance unexpended June 30, 1934--_                                                                 3, 749. 04
Outstanding liabilities June 30, 1934------------------------------                                                  7. 57
         Balance available June 30, 1934----------------------------3, 741.47

                                  20. MAURICE RIVER, N. J.

   Location.-Rises in Gloucester County, N. J., flows southerly
and southwesterly through Cumberland County, 321 miles, and
empties into Delaware Bay through Maurice Cove, about 89 miles
below Philadelphia, Pa. (See U. S. Coast and Geodetic Survey
Chart No. 1218.)
   Previous projects.-Adopted by the River and Harbor Act of
August 2, 1882, and modified in 1890, and in 1892. The cost and
expenditures were $43,000 for new work. For further details see
page 1785, Annual Report for 1915.
   Existing project.-This provides for a channel 7 feet deep at mean
low water across the bar at the mouth in Maurice Cove and up to
the head of navigation at Millville, including a turning basin at the
upper end, the width across the bar at the mouth and in the river to
Millville drawbridge to be 100 feet and 60 feet thence to the mill
dam. The sections of the river included in the project are from the
7-foot contour in the Delaware Bay to the 7-foot contour in the
mouth of Maurice River, a distance of 3 miles, and from French Bar,
31/ miles below Millville drawbridge, upstream to the mill dam, a
distance of 4 miles. The mean range of tide at the mouth is 5 feet
and at Millville 6 feet. The extreme tidal range is from 1 foot
below mean low water to 1 foot above mean high water.
   The estimate of cost for new work, made in 1906, is $156,200, ex-
clusive of amounts expended on previous projects. No estimate for
annual maintenance has been made.
        RIVERS AND HARBORS-PHILADELPHIA,                     PA., DISTRICT       267
   The existing project was adopted by the River and Harbor Act of
June 25, 1910 (H. Doc. No. 664, 59th Cong., 1st sess.). The latest
published map is in that document.
   Recommended modifications of project.-Under date of February
27, 1934, the Chief of Engineers recommended modification of the
existing project so as to provide for a channel 8 feet deep and 150
feet wide across the bar at the mouth in Maurice Cove, at an esti-
mated cost of $65,000, with maintenance estimated at $7,500 annu-
ally for the entire project, subject to certain conditions of local
cooperation (H. Doc. No. 275, 73d Cong., 2d sess.).
   Terminal facilities.-There are 42 pile-and-timber wharves, 5 ship-
yards, and 4 marine railways located on Maurice River, and most of
these have direct railroad connection. The terminals are adequate
for the existing commerce.
   Operatioins and results during fiscal year.-Under a contract for
dredging the channel between Manantico Creek and the drawbridge
at Millville to a depth of 9 feet and width of 100 feet, and between
the drawbridge and the downstream end of the Millville Manufac-
turing Co.'s wharf to a depth of 7 feet and width of 60 feet, work
was commenced May 4, and completed June 20, 1934. There were
removed 40,417 cubic yards of mud, sand, and gravel, place measure-
ment, at a cost of $23,765.03, for maintenance. The cost of sur-
veys and preliminary plans in connection with this work amounted
to $5,627.76, for maintenance. The total cost was $29,392.79, all
for maintenance. The expenditures amounted to $17,269.52.
   Condition at end of fiscal year.-About 65 percent of the existing
project has been completed. The remaining portion is the dredging
to project dimensions of a section of the channel in the upper river.
The controlling depths at mean low water on June 5, 1934, were
as follows: From Delaware Bay to the mouth, 5.8 feet; thence to
the drawbridge at Millville, 9 feet; and thence to the mill dam, 3.5
feet. The costs were $100,984.49, for new work, and $107,163.07, for
maintenance, a total of $208,147.56. The expenditures were
$196,024.29.
   Proposed operations.-It is proposed to apply the funds unex-
pended on June 30, 1934, amounting to $16,230.48, as follows:
Accounts payable June 30, 1934------------------              $12, 123. 27
Maintenance: Surveys and channel examinations----------------   4, 107. 21
      Total       -     --                  --------------                 16, 2301. 48

  No additional funds can be profitably expended during the fiscal
year 1936, as it is expected that no work will be necessary for the
needs of navigation for about 2 years.
                             Cost and financial summary
Cost of new work to June 30, 1934-------------------------- $143, 984. 49
Cost of maintenance to June 30, 1934------------------------- 107, 163. 07
      Total cost of permanent work to June 30, 1934 ---------        __   251, 147. 56
Minus accounts payable June 30, 1934---------------------                  12, 123. 27
     Net total expenditures     -239,                                          024. 29
Unexpended balance June 30, 1934----
                                 .16,                                          230. 48
      Total amount appropriated to June 30, 1934 -----......-             255, 254. 77
268        REPORT OF CHIEF OF ENGINEERS,                                        U.     S. ARMY,           1934


        Fiscal year ending June 30                       1930            1931           1932            1933            1934


Cost ofnew work           .--------------------------------------------                             $11, 954. 62
Cost of maintenance     ------------------- $1, 015. 80  $4, 944. 70 ------------                    25, 964. 65      $29, 392. 79
      Total cost-----------------------                 1, 015. 80     4, 944. 70                    37, 919. 27       29, 392. 79
Total expended     ---------------------------------                   5, 960. 50 ------------       37, 919. 27       17, 269. 52

Allotted.----------------------------                  33, 000. 00 -27, 039. 50 ..........------------37, 919. 27      33, 500. 00


Amount allotted from War Department appropriation act approved
  July 14, 1932-------------------------------------       --- $33, 500. 00
Gross amount expended------------------------                   17, 269. 52

     Balance unexpended June 30, 1934 ----------------------                                                        16,230. 48
Amount covered by uncompleted contracts--------------------                                                         12, 131. 77

        Balance available June 30, 1934----------------------                                                        4, 098. 71

Amount (estimated) required to be appropriated for completion of
existing project  ---------------------------------------                                                          55, 000. 00

                                  21. COLD SPRING INLET, N. J.

  Location.-Located in Cape May County, southern New Jersey,
about 3 miles east of Cape May city and about 16 miles northeast of
Delaware Breakwater. The inlet connects Cold Spring Harbor with
the Atlantic Ocean and is about 1 mile in length. (See U. S. Coast
and Geodetic Survey Chart No. 1219.)
  Existing project.-This provides for a channel 25 feet deep at
mean low water and 400 feet wide through the inlet, a distance of 1
mile, protected by two parallel jetties 700 feet or more apart. The
east jetty is a rubble mound 4,548 feet long. The west jetty is 4,410
feet long, of which 2,000 feet at the inner end is of stone-filled pile
and timber construction and the outer 2,410 feet is a rubble mound.
The mean range of tide is 41/2 feet, and the extreme tidal range is
very great, due to storms at sea, the extent of which has not been
recorded. The estimate of cost for new work, made in 1906, was
$1,311,000, including $100,000 contributed by local interests. The
latest (1928) approved estimate for annual cost of maintenance is
$20,000.
  The existing project was adopted by the River and Harbor Act of
March 2, 1907 (H. Doc. No. 388, 59th Cong., 2d sess.). The latest
published map is in the annual report for 1911, page 1382.
  Local cooperation.-All cooperation has been completed, except
the work of deepening and enlarging the inner harbor, which is 80
percent completed.
  Terminal facilities.-There are 25 wharves or landings, 1 coaling
pier, and 2 marine railways served by this waterway, including those
owned by the Navy Department. The wharves are indirectly con-
nected with two railroad systems and are adequate for existing
commerce.
   Operations and results during fiscal year.-A survey of the inlet
to ascertain the condition of the channel was made during May and
  'Exclusive     of available funds.
           RIVERS AND HARBORS-PHILADELPHIA,                              PA., DISTRICT                    269

June 1934, at a cost of $1,379.85, for maintenance. An amount of
$20,158.03, representing the excess cost of completion of dredging by
Government plant over the bid price, was charged against the con-
tractor during the year. The total cost during the year was minus
$18,778.18, for maintenance.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1917 at a saving of $331,725 under the estimated cost. The
controlling depth at mean low water on June 5, 1934, was 24.6 feet
from the Atlantic Ocean to the inner limit of the project. The costs
were $879,274.62 for new work and $414,020.35 for maintenance, a
total of $1,293,294.97, from United States funds. The total expendi-
tures were $1,293,078.53. In addition, $100,000 was expended for
new work from contributed funds.
   Proposed operations.--It is proposed to apply the funds unex-
pended on June 30, 1934, amounting to $20,621.47, as follows:
Accounts payable June 30, 1934             ------------------------------- $216. 44
Maintenance: Dredging by Government plant (September-October
  1934)   ----     -----------------------------------------              20, 405. 03
        Total-                                                                                         621. 47
                                                                                                  20-----------------------------,
  It is believed that no additional dredging will be required during
the fiscal year 1936, and no funds can, therefore, be profitably ex-
pended during that year.
                                  Cost and financial summary
Cost of new work to June 30, 1934------------------------- $879, 274. 62
Cost of maintenance to June 30, 1934-- ---- ---------------- 414, 020. 35
      Total cost of permanent work to June 30, 1934---          , 293, 294. 97
                                                               1--------
Minus accounts payable June 30, 1934------  --------------------        216. 44
     Net total expenditures-----------------------------1, 293, 078. 53
Unexpended balance June 30, 1934---------------------------- 20, 621. 47
        Total amount appropriated to June 30, 1934-------------                           1, 313, 700. 00


        Fiscal year ending June 30             1930         1931         1932          1933             1934

Cost of new work-------.-----------
Cost of maintenance-------.  . ------.-----    $943. 79     $625.37    $3, 273. 61 $147, 099. 54 -$18, 778. 18
Total expended-------------------------         930.92       638. 24    1,788. 80   149 725. 56      -20, 135. 83
Allotted.---------------- -------------- ---------------------------   52,000.00    100,000.00 -------


Balance unexpended July 1, 1933------------------------------                                         $485. 64
Gross amount expended----     --------------------- $1,486.72
Less reimbursements collected------------- -----    21, 622. 55
                                                                                              -20, 135. 83
      Balance unexpended June 30, 1934----------------------20, 621. 47
Outstanding liabilities June 30, 1934---------------------------- 216. 44
        Balance available June 30, 1934------------------------                                   20, 405. 03

   'In  addition, $100,000 was expended from contributed funds.
270     REPORT OF CHIEF OF ENGINEERS,           U.   S. ARMVY   1934

                        22. ABSECON CREEK, N. J.

   Location.-Rises in and flows easterly 5 miles through Atlantic
County, N. J., emptying into Absecon Bay about 5 miles northwest of
Atlantic City. (See U. S. Coast and Geodetic Survey Chart No.
1217.)
   Existing project.-This provides for a channel 5 feet deep at
mean low water 80 feet wide from deep water in Absecon Bay across
the flats to the mouth of the creek, a distance of 1 mile, thence 50 feet
wide to the highway bridge at Absecon village, a farther distance of
2 miles, including a turning basin at the head of navigation. The
mean range of tide is 4 feet. The extreme range of tide is from
1 foot below mean low water to about 1 foot above mean high
water. The estimate of cost for new work, made in 1911, was
$15,000. The latest (1928) approved estimate for annual cost of
maintenance is $2,500.
   The existing project was adopted by the River and Harbor Act of
July 25, 1912 (H. Doc. No. 71, 62d Cong., 1st sess.). The latest pub-
lished map is in that document.
   Terminal facilities.-There are four pile and timber wharves and
landings on this stream. The facilities are adequate for existing
commerce.
   Operations and results during fscal year.-Under contract dated
April 17, 1934, for maintenance dredging of the channel across Abse-
con Bay to the mouth and within the creek, work was commenced
May 22, 1934, and was in progress at the close of the fiscal year.
During the period 51,743 cubic yards of mud, sand, and shells were
removed, restoring the channel to project dimensions across Absecon
Bay to the mouth of the creek at a cost of $14,846.87 for maintenance.
The cost of surveys and preliminary plans in connection with this
contract was $284.35 for maintenance. The total costs were
$15,131.22, all for maintenance. The expenditures were $2,842.86.
   Condition at end of fiscal year.-The project was completed in 1913
at a saving of $3,065 under the estimated cost. The controlling
depths at mean low water on June 30, 1934, across the flats in Abse-
con Bay to the mouth was 6 feet; and thence to the highway bridge at
Absecon, 4.2 feet. The costs were $11,934.96 for new work and $52,-
896.26 for maintenance, a total of $64,831.22. Total expenditures
were $52,542.86.
   Proposed opterations.-It is proposed to apply the funds unex-
pended on June 30, 1934, amounting to $15,157.14, as follows:
Accounts payable June 30, 1934--------------------------------    $12,288.36
Completion of maintenance dredging under contract in force during
  August 1934---------- ----------------------------------------    2, 868. 78
      Total---------------------------------------------------15,       157. 14
   It is believed that no additional work will be required during the
fiscal year 1936, and no funds can, therefore, be profitably expended
during that year.
            RIVERS AND HARBORS-PHILADELPHIA,                                              PA., DISTRICT                   271
                                      Cost and financial summary
Cost of new work to June 30, 1934-------------------------        $11, 934. 96
Cost of maintenance to June 30, 1934     ------------------------- 52, 896. 26
      Total cost of permanent work to June 30, 1934                                                                     831. 22
                                                                                                                    6------------4,
Minus accounts payable June 30, 1934-------------------------                                                       12, 288. 36
     Net total expenditures-------------------------------                                                          52, 542. 86
Unexpended balance June 30, 1934 ---------------------------                                                        15, 157. 14
         Total amount appropriated to June 30, 1934-- -------------                                                 67,700. 00

         Fiscal year ending June 30                        1930           1931           1932          1933              1934


Cost of new work-.........------------             ------------------------------
Cost ofmaintenance--------- ----------------------------------------------.....................                       $15,131. 22
Total expended---------------           -----------------------------------------------                                  2, 842.86
Allotted-------------------................-----------                     .---------------------------------
                                                                                                       18, 000.00


Amount allotted from War Department Appropriation Act approved
  Mar. 4, 1933_------------------------------------------$18, 000. 00
Gross amount expended-- ---------------------------------      2, 842. 86
     Balance unexpended June 30, 1934                             157. 14
                                                              1---------------------5,
Amount covered by uncompleted contracts---------------------13,125. 69

         Balance available June 30, 1934                           -------------------------                         2, 031. 45

   23. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                         (GENERAL)

  The cost of work during the year was $58,578.81. The total ex-
penditures were $72,939.73. The balance unexpended, including ac-
counts receivable June 30, 1934, amounting to $42,829.41, will be
applied as needed during the fiscal year 1935 to payment of expenses
to be incurred in connection with the above items.
  The additional sum of $35,000 can be profitably expended during
the fiscal year 1936.
                                       Cost and financial summary

Cost of maintenance to June 30, 1934-----------------            $273, 390. 55
Plus accounts receivable June 30, 1934--------------------------    5, 002. 18

      Gross total costs to June 30, 1934 -----------------------                                               278, 392. 73
Minus accounts payable June 30, 1934---------------------                                                         3,707.38

     Net total expenditures---   -------------------------                                                     274,685. 35
Unexpended balance June 30, 1934--     -------------------------                                                37, 827. 23

         Total amount appropriated to June 30, 1934------------                                                312, 512. 58

         Fiscal year ending June 30                        1930           1931           1932           1933             1934


Cost of new work-_               ---------------------
Cost of maintenance------------------                $29, 592. 79      $40, 888. 92   $73, 036. 43   $56, 756. 62      $58, 578. 81

Total expended ..--......----------------------            349. 97
                                                         28,            36, 581. 30    45, 628. 30    76, 999. 72       72,939. 73
Allotted ----------------------------                    28, 500. 00    44, 150. 00    26, 500. 00    68, 656. 76      108, 955. 82

                        18
         91536-NGa 1934--
272         REPORT OF CHIEF OF ENGINEERS,                           U.     S. ARMY,         1934

Balance unexpended July 1, 1933                                                                       $1, 811. 14
Amount allotted from War Department Appropriation
                                   -$35,
  Act approved Apr. 26, 1934 _____________________-                                    000. 00
Amount allotted from War Department Appropriation
  Act approved July 14, 1932_________________________                            10, 000. 00
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933    __________________                                64, 000. 00
                                                                                                 109, 000. 00

      Amount to be accounted for -             -- ____
                                      -________-     --                          ______ -        110, 811. 14
Deductions on account of revocation of allotment_____                            ____-- __             44. 18

      Net amount to be accounted for ______________________-- -          110, 766. 96
Gross amount expended________-     -       -_____________    78, 027. 28
Less reimbursements collected                                 5, 087. 55
                                                                          72, 939. 73

      Balance unexpended June 30, 1934______________________                                          37, 827.23
Outstanding liabilities June 30, 1934______-______-_______-  -                                         3, 725.38

     Balance available June 30, 1934 _________________________                                        34, 101. 85
Accounts receivable June 30, 1934__                                                                    5, 002. 18

         Unobligated balance available June 30, 1934__ ____________39, 104. 03

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1 ___ _____________________________                                        35, 000. 00

               24. Other projects for whicl no estimates are submitted

           [Commercial statistics for these projects are given in pt. 2 of report]


                                                         For last  Cost and expenditures
                                                         full re-     to June 30, 1934                 Estimated
                                                         port see                                      amount  re-
                                                                                                        quint re-
                   Name of project
                                                        annual re-                                      quired to
                                                        portfor-   New work      Maine-                 complete
                                                                                   nance

1. Chester River, Pa.------      --------------------- 1931             $6, 000. 00      $650. 26         $3, 600
2. Appoquinimink River, Del.-------------------- 1931                   36, 973. 35    40, 998. 56         3, 000
3. Leipsic River, Del.---..------------------------        1931         36, 956. 06    32, 167. 94    Completed
4. Harbor of Refuge, Delaware Bay, Del.2                   1932
                                                       .---------    4, 987, 657. 13   120, 455. 55       287, 000
5. Inland Waterway between Rehoboth Bay and
      Delaware Bay, Del.-----       -------------------- 1931            264, 499. 73    21, 603. 53     85, 600
6. Big Timber Creek, N. J.1 3         ______------         1933         4 16, 057. 39 ----------- Completed
7. Raccoon Creek, N. J.1     -------------------------     1933          83, 664. 96 82, 754.58 Completed
8. Oldmans Creek, N. J.1-------------------------          1931          31, 188. 43    19, 511. 57     88, 800
9. Alloway Creek, N. J.1------------------------- 1931                   21, 397. 73    33, 002. 27 Completed
                        -
10. Absecon Inlet, N. J.' .--------------------------       1931         441,473. 95 5244,423. 15       300,000
11. Tuckerton Creek, N. J.1---------      -------------- 1933             60, 242. 16 103, 137. 84 Completed
12. Toms River, N. J.1------------------------------        1933          10, 050. 00    15, 007. 59 Completed

  1 Channel adequate for existing commerce.
  2Awaiting local cooperation.
  3Modification of project is recommended in Rivers and Harbors Committee Doec. No. 15, 73d Cong.,
1st sess.
  4Exclusive of $50,000 expended from contributed funds.
  5 Includes $915.59, value of plant on hand June 30, 1931.

  1
      Exclusive of available funds.
             RIVERS AND HARBORS-BALTIMORE,                                         MD., DISTRICT                 273

Status of reports callec for by river and lharbor acts and committee resolutions


        Locality           Authorization act      Transmitted                     Document no.        Recommenda-
                                                  to Congress                                             tion

Barnegat Inlet, N. J.... Rivers and Harbors       Aug. 23, 1933             Rivers and Harbors Favorable.
                           Committee resolu-                                   Committee, 19, 73d
                           tion, Jan. 20, 1931.                                Cong., 2d sess.
Delaware Bay, Del., Rivers and Harbors            Jan. 16, 1934              .                           Unfavorable.
                                                                                        ..--------------------
  Harbor of Refuge, and    Committee resolu-
  Broadkill River, in-     tion, May 4, 1933.
  land waterway from
  Rehoboth Bay to Del-
  aware Bay.
Delaware River to Ches- Rivers and Harbors        Dec. 6,1933               Rivers and Harbors         Favorable.
  apeake Bay, Del. and     Committee resolu-                                  Committee, 24. 73d
  Md., Inland Water-       tion, Jan. 7, 1932.                                Cong., 2d sess.
  way.
Delaware River to Ches- Rivers and Harbors        July 31,1933              Rivers and Harbors             Do.
  apeake Bay, Del. and     Committee resolu-                                  Committee, 18, 73d
  Md., Inland Water-       tion, Jan. 20, 1933.                               Cong., 2d sess.
  way.
Delaware River, Phila- Rivers and Harbors
  delphia, Pa., to Tren-   Committee resolu-
  ton, N. J., and at Mor-  tion, Dec. 14, 1929.
  risville, Pa.
Frankford Creek, Pa_... Rivers and Harbors              ..............................
                           Committee resolu-
                           tion, Jan. 29, 1934.
Maurice River, N. J..... Rivers and Harbors           Feb. 28,1934           House, 275, 73d Cong.,        Do.
                           Act, Mar. 3, 1925.                                 2d sess.
West Creek, N. J _-_. Rivers and Harbors          .
                           Committee resolu-
                           tion, Nov. 2, 1933.
Wilmington Harbor, Rivers and Harbors             Feb. 27,1934             Rivers and Harbors              Do.
  Del.                     Committee resolu-                                  Committee, 32, 73d
                           tion, Nov. 17, 1932.                               Cong., 2d sess.


      IMPROVEMENT OF RIVERS AND HARBORS IN THE
               BALTIMORE, MD., DISTRICT

  This district includes the waterways along the Atlantic Ocean from
the Delaware-Maryland State line to Cape Charles, Va., and also
includes Chesapeake Bay and its tributaries, except the western half
of the bay and tributaries thereto south of Cove Point.
   District engineer: Col. E. J. Dent, Corps of Engineers.
   Division engineer: Col. T. H. Jackson, Corps of Engineers, to
June 28, 1934, and Col. E. I. Brown, Corps of Engineers, since that
date.
                                          IMPROVEMENTS

                                               Page                                                               Page
1.    Baltimore Harbor and Chan-                          7. Tangier Channel, Va __.                               285
        nels, Md___-------------                274       8. Ocean City Inlet, and Sine-
2.    Knapps Narrows, Md_______                 278            puxent Bay, Md_                                      288
3.    Broad Creek River, Del____                279       9. Examinations, surveys, and
4.    Wicomico River, Md________                281            contingencies (general) --                           292
5.    Upper Thoroughfare, Deals                          10. Other projects for which no
        Island, Md____________                  282            estimates are submitted__                            293
6.   Twitch Cove and Big Thor-
        oughfare River, Md ___                  284
274    REPORT OF CHIEF OF ENGINEERS,        U.   S. ARMY,   1934

           1. BALTIMORE HARBOR AND CHANNELS, MD.

    Location.-Baltimore Harbor consists of the Patapsco River and
its tributaries. Patapsco River: The river is formed by the junction
of the North and South Branches, both of which rise in central
Maryland. It is about 65 miles long and flows in a general south-
easterly direction. (See U. S. Coast and Geodetic Survey Chart No.
549.)
    Previous projects.-Patapsco River: The original project was
dated July 4, 1836. Modifications were contained in the acts of
August 30, 1852; June 10, 1872; March 3, 1881; June 3, 1896; March
3, 1905; March 3, 1909; February 27, 1911; and March 4, 1913.
    Middle Branch: The original project was dated June 3, 1896.
    Curtis Bay: The original project was dated July 15, 1892. It was
modified by the act of June 13, 1902.
    York Spit: The original project was dated March 3, 1905.
    The cost and expenditures on original and modified projects were:
For new work, $8,764,003.40; for maintenance, $399,801.77; a total
of $9,163,805.17. For further details see pages 1787 and 1788 of the
Annual Report for 1915, and page 389 of the Annual Report for 1932.
    Existing project.-This provides for: (a) A main channel between
Cape Charles, Va., and Fort McHenry, Baltimore, Md., with dimen-
sions as follows: 37 feet deep and 1,000 feet wide between the curves
of 37-foot depth in Chesapeake Bay opposite York Spit, a distance
of about 4 miles; 37 feet deep and a general width of 600 feet from
the 37-foot curve in Chesapeake Bay at the entrance to the Craighill
section to the west side of the main private channel to Sparrows:
Point, a distance of about 121/2 miles, and thence 35 feet deep and
600 feet wide to Fort McHenry, a distance of about 71 miles;
 (b) for branch channels with dimensions as follows: 35 feet deep
and 400 feet wide from the main channel to head of Curtis Bay, a
distance of about 21/5 miles; 35 feet deep and 400 feet wide from
the main channel at Fort McHenry to Ferry Bar, and thence 27 feet
deep and 250 feet wide to the Western Maryland Railway bridge, a
total distance of about 31/s miles; (c) for widening the angle between
the Fort McHenry and Ferry Bar sections; (d) for widening at the
approaches and bends and for anchorages and turning basins, as
approximately shown on the maps accompanying Rivers and Harbors
Committee Document No. 11, Seventieth Congress, first session and
House Document No. 29, Seventy-first Congress, first session; e) it
is further provided that as rapidly as the city of Baltimore, at its
own expense, extends the 35-foot depth into the Northwest Branch
 (inner harbor) the United States shall take over the maintenance
of that depth. All depths refer to mean low water. The mean
range of tide in the upper sections of the harbor is a little more than
1 foot under ordinary conditions, with an extreme range of 10.4 feet.
In the York Spit Channel these ranges are 2.5 and 3.3 feet,
respectively.
    The estimate of cost for new work, revised in 1929, is $4,404,640,
exclusive of amounts expended on previous projects. The latest
 (1929) approved estimate for annual cost of maintenance is $187,000..
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1905, provided for the main 35-foot
         RIVERS AND HARBORS-BALTIMORE,         MD., DISTRICT      275
channel 600 feet wide throughout (H. Doc. No. 186, 57th Cong., 2d
sess.); the act of March 3, 1909, provided for the anchorage basin
near the intersection of the Fort McHenry and Curtis Bay Channels
upon the condition that such addition could be made within the
original limit of cost (no prior estimate or recommendation); the
act of February 27, 1911, provided for an increase of channel width
at the entrances and bends, provided such increase could be made
within the limit of the original estimate; the act of March 4, 1913,
provided for an increase in width of the York Spit Channel from
600 to 1,000 feet (H. Doc. No. 1190, 62d Cong., 3d sess.); the 'act
of August 8, 1917, provided for additions to the then existing project
and for the inclusion of all Government river and harbor works in
the Patapsco River, its tributaries, and the approaches thereto into
one project to be known as Baltimore TIIarbor, Md., and approaches
thereto (H. Doc. No. 799, 64th Cong., 1st sess.). The act of January
21, 1927, authorized change in location of the anchorage near the
upper end of the Fort McHenry Channel. The act of July 3, 1930,
authorized increased anchorage facilities (H. Com. Doc. No. 11, 70th
Cong., 1st sess.); increased depth from 35 to 37 feet in that portion
of the channel leading to Baltimore lying between the 37-foot curve
near Baltimore Light to the Sparrows Point entrance channel; simi-
lar increased depth in York Spit section; widening the angle between
Fort McHenry and Ferry Bar sections; and increased width from
250 to 400 feet in the Curtis Bay section (H. Doc. No. 29, 71st Cong.,
1st sess.). The two last-mentioned documents contain the latest
published maps.
    Local cooperation.-TheRiver and Harbor Act of August 8, 1917,
required that on all new work under the project approved by that
act, except the channel into Curtis Bay, improvement by the United
States is made conditional upon local interests providing, whenever
required by the Chief of Engineers, free of cost to the United States,
suitable areas behind bulkheads or other revetment, satisfactory to
the district engineer, in which the dredged material may be de-
posited. In compliance with this requirement the city of Baltimore
provided space behind a bulkhead at McComas Street on which
782,998 cubic yards were deposited.
    The River and Harbor Act of July 3, 1930, provided for increased
anchorage facilities, subject to the provisions that no work shall be
started on the area therein recommended until local interests have
provided suitable disposal areas satisfactory to the district engineer
alongside of bulkheads behind which said interests will agree to
pump the material without delay to the Government work; or, in
lieu of the above requirement, agree to contribute the sum of 5 cents
per cubic yard, scow measure, to cover the additional cost to the
United States for disposal of the material on its own dumping area.
    The city has constructed an airport, which involves a fill behind
bulkheads of more than 10,000,000 cubic yards of material. Material
removed from the anchorage areas under the existing project and
deposited in a rehandling basin alongside the airport was deposited
by the city on the airport site.
    Terminal facilities.-The total length of developed water front
in Baltimore Harbor, measured along the established bulkhead line,
276    REPORT OF CHIEF     OF ENGINEERS, U.    S. ARMY,   1934

is about 27 miles. Extensive areas remain which are available for
further development. The existing terminal facilities include
wharves, piers, grain elevators, coal and ore _piers, storage and bunk-
ering facilities for fuel oil, terminal warehouses, marine railways,
dry docks, and shipyards.
   Preliminary steps have been taken looking to an increase in mu-
nicipal terminal facilities. The State legislature has authorized
the city of Baltimore to incur an indebtedness of $50,000,000 for
the development of the port. Of this amount $10,000,000 was made
immediately available for the construction of terminals subject to
the restriction that no construction work can be undertaken until a
lease at a fair rental for a term of years has been entered into with
a responsible person or corporation. The Port Development Com-
mission, which is charged with the administration of this fund,
has completed the construction of an $8,500,000 terminal pier at
Port Covington under agreement with the Western Maryland
Railway Co. For further details see page 391, Annual Report for
1932.
   Operations and results during fiscal year.-Dredging, new work,
under contract in Craighill-Cutoff angle was completed, 937,249 cubic
yards being removed, cost $127,531.96. Maintenance dredging by
U. S. dredge Delaware in Cutoff-Brewerton angle was commenced,
808,636 cubic yards being removed, cost $55,474.72. Work was in
progress at the end of the year. The total costs were $127,531.96
for new work and $55,474.72 for maintenance, total $183,006.68. The
total expenditures were $181,421.08.
   Condition at end of fiscal year.-The existing project is about 73
percent completed. The approach channel opposite York Spit has
been dredged to a depth of 37 feet at mean low water for a center
width of 900 feet and 34.9 feet at mean low water for a width of
1,000 feet; the branch channel into Curtis Bay and the Ferry Bar
section as far as the entrance channel to Port Covington have both
been dredged to full project width, 400 feet, and depth, 35 feet at
mean low water.
   The work remaining to be done includes completion of the York
Spit section, Ferry Bar section from Port Covington entrance chan-
nel to Ferry Bar and the Spring Garden section, including turning
basin, from Ferry Bar to Western Maryland Railroad bridge.
   The controlling depths are 37 feet along the center and 34.9 feet
along the edges in York Spit section, ascertained in March 1933;
38 feet in Craighill entrance, ascertained in October 1931; Craighill
section 35.5 feet along the center line and 34.2 feet along the sides,
ascertained in April 1933; Craighill-Cutoff ange 34.4 feet, ascer-
tained in October 1933; Cutoff section 37,4 feet along center line,
36.8 feet along the sides, ascertained in January 1933; Cutoff-Brew-
erton angle 33.9 feet, ascertained in June 1933; Brewerton section to
entrance to Sparrows Point, 34.3 feet, ascertained' in June 1933; and
for the remainder of the section to Brewerton-Fort McHenry angle
33.4 feet, ascertained in June 1933; Brewerton-Fort McHenry angle,
31.8 feet, ascertained in June 1933; Fort McHenry section 33.3 feet,
ascertained in July 1933; Curtis Bay section 33.8 feet, ascertained
in July 1933; Ferry Bar section from its intersection with the Fort
                    RIVERS AND HARBORS-BALTIMORE,                                            MD., DISTRICT                        277
McHenry section to the private channel leading to the Western
Maryland Railway piers, 32.1 feet, ascertained in June 1933, and
thence 29 feet to Ferry Bar, ascertained in November 1923, and 27
feet from Ferry Bar to the Hanover Street Bridge, ascertained in
December 1923, thence 27 feet in the old Southwest Baltimore Harbor
Channel, above Hanover Street bridge, ascertained in January 1928;
Quarantine anchorage 33.4 feet, ascertained in July 1933; Fort Mc-
Henry anchorage 31.7 feet, ascertained in July 1933; and Riverview
anchorage 32.9 feet ascertained in July 1933. Total costs were
$6,237,395.75, of which $3,215,246.93 was for new work and $3,022,-
148.82 for maintenance. The total expenditures were $6,291,513.62.
  Proposed operations.-The unexpended balance July 1, 1934, of
$313,755.21, including accounts receivable of $2,231.69, will be applied
as follows:
Accounts payable June 30, 1934_---__.---.--------              -     $26, 308. 76
Maintenance: Dredging by United States plant in the following sec-
tions of the project channels: Craighill section, Craighill-Cut-off
  angle, Cut-off-Brewerton angle, Brewerton section, Brewerton-Fort
McHenry angle, Fort McHenry section, quarantine anchorage, and
  York Spit section, July 1, 1934, to June 30, 1935--------------287, 446. 45

            Total for all work                               ---------------------------------313, 755.21
  The additional sum of $315,000 can be profitably expended during
the fiscal year 1936, to be applied to maintenance where needed
throughout the fiscal year.
                                                  Cost and flnancial summary

Cost of new work to June 30, 1934_.----..-----                                                   -------            $11, 979, 250. 33
Cost of maintenance to June 30, 1934 ----------------                                                                 3, 421, 950. 59
      Total cost of permanent work to June 30, 1934---------- 15, 401. 200. 92
Value of plant, materials, etc., on hand June 30, 1934-----------  78, 194. 94

      Net total cost to June 30, 1934   ----------------------- 15, 479, 395. 86
Plus accounts receivable June 30, 1934 ------------------------       2, 231. 69

     Gross total cost to June 30, 1934_-_.-.-_---......                                                                15, 481, 627. 55
Minus accounts payable June 30, 1934---4      --------------                                                    _           26, 308. 76

     Net total expenditures  -------------                                                                             15, 455, 318. 79
Unexpended balance June 30, 1934_-------------                                              __         ------              311, 523. 52
            Total amount appropriated to June 30, 1934_ __-_____--                                                     15, 766, 842. 31

     Fiscal year ending June 30                       1930              1931              1932                  1933           1934


Cost of new work-------------...............       $296, 541. 54   $635, 981.81       $873, 242. 33   $490, 297. 93 $127, 531. 96
Cost of maintenance------------..........           407, 625. 88    300, 351.43         27, 467. 68 --------------    55, 474. 72

        Total cost----.---. ---...                  704, 167. 42     936, 333. 24      900, 710. 01        490, 297. 93       183, 006. 68
Total expended---------------..................     668, 293. 03     777, 582. 72    1, 165, 215. 27       475, 192. 28       181, 421. 08
Allotted...........---------------------            535, 500. 00   1, 051, 660. 00     232, 112. 12        741, 182. 64       193, 707. 55
278        REPORT      OF CHIEF OF ENGINEERS, U.                   S. ARMY,          1934

Balance unexpended July 1, 1933-------------------------$299, 237.05
Amount allotted from War Department Appropria-
  tion Act approved Apr. 26, 1934_ __-__ ______-$200, 000. 00
Amount allotted from War Department Appropria-
tion Act approved Mar. 4, 1933_   ----    __- -  58,, 000. 00
                                                               258, 000. 00
      Amount to be accounted for___________-__________                                   557, 237. 05
Deductions on account of revocation of allotment _____                                    64, 292. 45
      Net amount to be accounted for__ -----     ____    __----492, 944. 60
Gross amount expended------------------------238, 211.20
Less reimbursements collected-------------------    56, 790. 12
                                                                181, 421. 08

      Balance unexpended June 30, 1934------_______                                      311, 523.52
Outstanding liabilities June 30, 1934_____ _____ ____                   ______            94, 872. 61

      Balance available June 30, 1934-----------------------216, 650.91
Accounts receivable June 30, 1934----------------------------  2, 231. 69

        Unobligated balance available June 30, 1934_____________                         218, 882. 60

Amount (estimated required to be appropriated for completion
of existing project 1-----------------------------------    1,189, 400. 00

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1- - - - - - - - - - - - - -- - - - - - - - - - - - - -   -
                                                                                         315, 000. 00

                              2. KNAPPS NARROWS, MD.
   Location.-This waterway is a small channel separating Tilghman
Island from the mainland of the eastern shore of Chesapeake Bay
about 40 miles south of Baltimore, Md. (See U. S. Coast and Geo-
detic Survey Chart No. 1225.)
  Existing project.-No work has been authorized by Congress.
   The provision of a channel 9 feet deep and 75 feet wide suitably
widened at the bends as recommended by the Chief of Engineers in
House Document No. 308. Seventy-second Congress, first session, at
an estimated cost of $68,700, with maintenance estimated at $1,500
annually, was included in the Public Works program under the
National Industrial Recovery Act.
  Recommended modifications of project.--Included in Public Works
program.
  Local cooperation.-Localinterests are required to furnish, free of
cost to the United States, all lands required for the execution of the
project and suitable areas for deposit of the dredged material dur-
ing initial construction and for future maintenance as and when
needed. The project further provides that no work shall be under-
taken until the local interests have furnished assurances satisfactory
to the Chief of Engineers that a drawbridge suitable for the full
utilization- of the improved channel will be constructed on plans
approved as provided by law, and that all parts of the present bridge
not incorporated in the new structure will be removed by the time
that the channel is completed. Requirements as to land and disposal
areas have been met. Bridge requirements have not yet been com.
plied with.
   Terminal facilities.-There is a bulkhead wharf on each side of
the southerly abutment of the bridge across the Narrows. In addi-
  1 Exclusive of available funds.
                RIVERS AND HARBORS-BALTIMORE,                    MD., DISTRICT              279
tion, there are several small boat landings within the Narrows and a
marine railway for the repair of boats of few feet draft.
   Operations and results during fiscal year.-No work has been done
in the field. The expenditures, $469.74, were for preliminary office
expenses, all for new work.
   Condition at end of fiscal year.-No work has been done on the
existing project, due to delay of local interests in complying with
terms of the law requiring local cooperation. The controlling depth
at mean low water is 1 foot, ascertained in October 1931. Total
expenditures (public works funds) have been $469.74, all for new
work.
   Proposed operations.-The unexpended balance July 1, 1934, of
$68,230.26 from an allotment made by the Public Works Adminis-
tration, will be applied to completion of the project by contract,
August 1, 1934, to December 31, 1934, provided conditions of local
cooperation are complied with. No funds can be profitably expended
during the fiscal year 1936, as no maintenance is expected to be
necessary.
                                  Cost and financial summary

Cost of new work to June 30, 1934__          _____
Cost of maintenance to June 30, 1934________
      Total cost of permanent work to June 30, 1934 .........
Value of plant, materials, etc., on hand June 30, 1934 _____________                     $469. 74

Net total expenditures ----------                                  _             469. 74
Unexpended balance June 30, 1934               _____________________________ 68, 230. 26

         Total amount appropriated to June 30, 1934---------------                     68, 700. 00

         Fiscal year ending June 30         1930        1931        1932       1933        1934


Cost of new work ....... ...  ..------------        .-----------
                                                        --       .                ----
                                                                      .------.--------
Cost of maintenance---...---------------------------------------------------------
Total expended----
               ....--------           ----------------------------------------------        $469.74

Allotted.........-------------------------------------------------------------------68,     700. 00


Amount allotted from National Industrial Recovery Act approved
  June 16, 1933 _ -------------------------------------        $68, 700. 00
Gross amount expended----__-___-                __--_               469. 74

         Balance unexpended June 30, 1934                                              68, 230. 26

                              3. BROAD CREEK RIVER, DEL.

    Location.--This is a tributary of Nanticoke River, which rises
near the Great Cypress Swamps in the southern part of Sussex
County, Del., and flows in a westerly direction, emptying into Nanti-
coke River about 6 miles below Seaford, Del. (See U. S. Coast and
Geodetic Survey Chart No. 78.)
  Previous projects.-Adopted June 14, 1880, and modified July 13,
1892. The amount expended was $50,000 for new work and
$7,462.57 for maintenance, a total of $57,462.57. For further details
see page 1790 of Annual Report for 1915.
280          REPORT           OF CHIEF              OF ENGINEERS,       U.    S.     ARMY,     1934


   Existing project.-This provides for dredging a channel 70 feet
wide and 8 feet deep at mean low water from Portsville Landing
to Laurel; for straightening and widening several sharp bends in
the river; and for widening the channel below the railroad bridge
at Laurel so as to provide a suitable turning basin. The length of
the section included in the project is 4 miles, and its lower end is
about 3 miles above the mouth of the river. The mean range of
tide is 3 feet, and the extreme tidal range is 4.5 feet under ordinary
conditions. The estimate of cost for new work, made in 1909, was
$14,520, exclusive of amounts expended on previous projects. The
latest (1909) approved estimate for annual cost of maintenance is
$1,500. The existing project was adopted by the River and Harbor
Act of July 25, 1912 (H. Doec. No. 601, 61st Cong., 2d sess.). For
latest published map, see Annual Report for 1891, page 1209.
   Terminal facilities.-These consist of 2,600 linear feet of solid
bulkhead wharves. These facilities are considered adequate for
existing commerce.
   Operations and results during fiscal year.--Work under contract
for restoration of project channel from the upper end to the turning
basin below the Pennsylvania Railroad bridge, a distance of about
2,800 feet, was commenced April 23 and completed June 9, 1934.
The total cost, all for maintenance, was $8,076.93. The total expendi-
tures were $8,130.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1913. The controlling depth, ascertained in June 1934, is
8 feet at mean low water. The total costs of the existing project have
been $14,520 for new work and $35,795.51 for maintenance, a total
of $50,315.51. The total expenditures were $50,368.58.
   Proposedoperations.-Nooperations are proposed during the fiscal
years 1935 and 1936, as no maintenance is expected to be necessary.
The unexpended balance of $1,925.33, including accounts receivable
of $69.50, will be applied to payment of outstanding liabilities and
to maintenance contingencies.
                                          Cost and financial summary

Cost of new work to June 30, 1934------------------------- $64, 520. 00
Cost of maintenance to June 30, 1934_ -- ------- -----  -   43, 258. 08
      Total cost of permanent work to June 30, 1934 ------------                                    107, 778. 08
Plus accounts receivable June 30, 1934_______________--                                                   6_____-69.
                                                                                                              50

      Gross total costs to June 30, 1934                        --------------------- 107, 847. 58
Minus accounts payable June 30, 1934                                                         6. 43
                                                                                            1----------------------

     Net total expenditures -------     --------------------- 107, 831.15
Unexpended balance June 30, 1934-----------------------------1, 855. 83
          Total amount appropriated to June 30, 1934--------------109, 686. 98

          Fiscal year ending June 30                    1930     1931              1932      1933        1934


Cost of new work------.........--------------------------------------------------------
Cost of maintenance-----_-------------------------               $173. 90    $21,392. 85 -----------    $8, 076.93

Total expended------------------------------------                173. 90     21, 392. 85 ---------..    8, 130. 00
Allotted ...-------------------------------------              35, 000. 00 -13, 433. 25 .---------       9, 985. 83
          RIVERS AND HARBORS--BALTIMORE,            MD., DISTRICT          281
Amount allotted from War Department Appropriation Act approved
Mar. 4, 1933-------------------------------------               $10, 000. 00
Deductions on account of revocation of impounded funds----------       14. 17

      Net amount to be accounted for_---------------------___         9,985. 83
Gross amount expended---------------------------------------          8, 130. 00

      Balance unexpended June 30, 1934------------------___           1,855.83
Outstanding liabilities June 30, 1934-.......            $16. 43
Amount covered by uncompleted contracts---------___ 1,206. 20
                                                                      1, 222. 63
     Balance available June 30, 1934---------------------------         633.20
Accounts receivable June 30, 1.934------------------- -------------      69. 50

      Unobligated balance available June 30, 1934-----------------      702. 70

                         4. WICOMICO RIVER, MD.

  Location.-This river has its source in the northern part of Wi-
comico County, Md., and flows in a generally southwesterly direction,
emptying into Monie Bay, a tributary of Tangier Sound. (See U. S.
Coast and Geodetic Survey Chart No. 77.)
   Previous projects.--Adopted June 10, 1872. The cost and expendi-
tures were $50,000. For further details see page 1789 of Annual
Report for 1915.
   Existing projet.-This provides for dredging a channel 12 feet
deep at mean low water and 100 feet wide from the Main Street
Bridge at Salisbury to deep water in Monie Bay, and 9 feet deep
and 100 feet wide at bottom in the North and South Prongs at Salis-
bury from the Main Street Bridge to the head of navigation, with
a turning basin in each prong. The length of river included in the
project is about 23 miles, and the lower end of the project extends
into Monie Bay. The mean range of tide is about 3 feet, and the
extreme tidal range is 4.4 feet under ordinary conditions.
   The estimate of cost for new work, revised in 1930, was $141,300,
exclusive of amount expended on previous projects. The River and
Harbor Act of July 3, 1930, in adopting the 12-foot project limits
expenditures thereon to $75,000, of which not to exceed $8,290 is for
removal of shoals. The latest (1930) approved estimate for annual
cost of maintenance is $4,000.
   The existing project was authorized by the following river and
harbor acts: The act of September 19, 1890 (H. Doc. No. 20, 51st
Cong., 1st sess.), provided for a channel 9 feet deep from Main Street
Bridge to about 2 miles below; the act of June 25, 1910, provided
for an extension of the 9-foot depth into the North Prong from the
Main Street Drawbridge to Salisbury Milldam and a turning basin
 (H. Doc. No. 569, 61st Cong., 2d sess.); the act of March 2, 1919
 (H. Doc. No. 1509, 63d Cong., 3d sess.), extended the project for 9
feet depth into the South Prong to the head of navigation at Cathell
Street, Salisbury, including a turning basin, and extended the project
down to the mouth of the river in Monie Bay, and the act of July 3,
1930, provided for the 12-foot channel. The latest published map is
in House Document No. 1509, Sixty-third Congress, third session.
   Local cooperation.-Fully complied with.
282          REPORT OF          CHIEF OF ENGINEERS,                       U.     S.     ARMY,           1934


  Terminal facilities.-These consist of approximately 8,000 feet of
solid bulkhead wharf, all privately owned, about 6,000 feet of which
are open to general public use. They are considered adequate for
existing commerce.
  Operationsand results duringfiscal year.-None. No expenditures
were made.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1931. The controlling depth at mean low water in the
main river up to a point about 1,000 feet below the Main Street
Bridge is 12 feet, ascertained in August 1931; in the South Prong 9
feet, ascertained in November 1930; in the main river from a point
about 1,000 feet below the Main Street Bridge to the bridge 9.5
feet, and in the North Prong 5 feet, ascertained in January 1934.
The costs and expenditures have been $140,748.04 for new work and
$69,041.08 for maintenance, a total of $209,789.12.
  Proposed operations.-The unexpended balance July 1, 1934, of
$14,200, will be applied to maintenance dredging in restoration of
project in the North Prong and in the main river at Salisbury, by
contract, August 1 to November 1, 1934.
   No additional funds can be profitably expended during the fiscal
year 1936.
                                    Cost and financial ssmnmary
Cost of new work to June 30, 1934-------                                                                     $190, 748. 04
Cost of maintenance to June 30, 1934                                                                            69, 041.08
         Total cost of permanent work to June 30, 1934 .-.---. __                                             259; 789. 12

Net total expenditures ----------------------------------------                                               259, 789. 12
Unexpended balance June 30, 1934----------------------__                                                       14, 200. 00
         Total amount appropriated to June 30, 1934---------------                                            273, 989. 12

         Fiscal year ending June 30                  1930          1931            1932               1933            1934


Cost of new work----------------           --    ------------ $54, 208. 09     $20, 150. 97 ------------............----------
Cost of maintenance ------------------            $23, 453. 22     222. 31     ............................               ___-_--

      Total cost-------------       --- ------     23, 453. 22   54, 430. 40    20,150. 97        ---------------------
Total expended - -                  -    - --      25,169. 21    36, 189. 09    40, 361. 63 - .....               .....
Allotted--        .-------------
                             - --------------       5, 500. 00   73, 000. 00 __       _--------     -$333. 53     $14, 200. 00


Amount allotted from War Department Appropriation Act approved
  Apr. 26, 1934-----------------------------------------------$14,                                                  200. 00
Balance unexpended June 30, 1934------------------------------                                                  14, 200. 00

                  5. UPPER THOROUGHFARE, DEALS ISLAND, MD.

  Location.-This is a natural waterway lying between Deals Island
and the mainland of Somerset County, Md., on the eastern shore of
Chesapeake Bay. (See U. S. Coast and Geodetic Survey Chart No.
1224.)
  Existing project.-An appropriation of $5,000 was made in 1882
for the construction of a harbor of refuge at the entrance to Upper
            RIVERS AND HARBORS-BALTIMORE,                          MD.1 DISTRICT        283
Thoroughfare, but as the amount was insufficient no useful work was
performed, the work done being limited to surveys at a cost of
$330.09.
   Supplementing the work authorized by Congress, the improve-
ment of Upper Thoroughfare at Deals Island, Md., to provide a
channel 9 feet deep and 75 feet wide from Tangier Sound to and
along the south shore of the Thoroughfare protected by breakwaters
at the entrance and with a turning basin at the inner end and an
anchorage area 6 feet deep and 150 feet wide extending across the
waterway parallel to the highway bridge, as recommended by the
Chief of Engineers in Rivers and Harbors Committee Document No.
37, Seventy-second Congress, first session, at an estimated cost of
$47,000, with $2,000 annually for maintenance, was included in the
Public Works program under the National Industrial Recovery Act.
   Recommended modifications of project.-Included in Public Works
program. Abandonment of the project adopted in 1882 was recom-
mended in House Document No. 467, Sixty-ninth Congress, first
session.
   Local cooperation.-Local interests are required to provide a suit-
able dock at the turning basin, which shall be open to the public on
just and equal terms; to build a dike for retaining dredged material
along the south shore of the thoroughfare west of the bridge; to
provide necessary lands behind the dike for the deposit of dredged
material, and to, construct a suitable road for free public use along
the water front connecting with the local road system. These con-
ditions have been met, except that the dock and road cannot be built
until completion of fill adjacent thereto.
   Terminal facilities.-There are two small packing houses along
the project channel, at which sea food is landed.
   Operations and results during fiscal year.-Work under contract
for the construction of two converging breakwaters, was commenced
April 10, and completed June 9, 1934. Work under contract for
dredging was commenced March 21 and completed May 24, 1934.
This resulted in the completion of the project. The total cost, all
for new work was $37,044.10, and the expenditures were $37,169.61,
all from public works funds.
   Condition at end of fiscal year.-No work was ever done on the
project authorized by Congress other than surveys at a cost and ex-
penditure of $330.09, charged to new work. The project author-
ized under the National Industrial Recovery Act was completed
during the fiscal year. The controlling depth at mean low water,
ascertained in June 1934 is the project depth. The costs were $37,-
044.10, and the expenditures were $37,169.61, all from public works
funds and charged to new work.
   Proposed operations.-No operations are proposed during the
fiscal years 1935 and 1936 as no maintenance is expected to be neces-
sary. The unexpended balance of $10,144.75, including accounts
receivable of $314.36, will be applied as follows:
Outstanding liabilities ______---___                 ____________                   $188. 85
Balance remaining       ---------------------------------------                    9,955.90
        Total      ---------------------------------------------                   10, 144. 75
284        REPORT OF CHIEF OF ENGINEERS,                             U.      S. ARMY        1934

                                Cost and financial summary

Cost of new work to June 30, 1934- _-_---.--- ---------------- $37, 374. 19
Cost of maintenance to June 30, 1934--_-..--.----------      ----------
      Total cost of permanent work to June 30, 1934- -------                                     - 37, 374. 19
Plus accounts receivable June 30, 1934_..............-.---.                                            314. 36

      Gross total costs to June 30, 1934_......................... 37, 688. 55
Minus accounts payable June 30, 1934--------------------------         188.85

     Net total expenditures_ __----____-_-_--_-                                                      37, 499. 70
Unexpended balance June 30, 1934.----.-------------------                                             9,830.39

        Total amount appropriated to June 30, 1934_-...... ____.                                     47, 330. 09

        Fiscal year ending June 30            1930            1931            1932        1933           1934

                                                      .------------..........------
Cost ofnew work---..................................----        --------------------...........    044. 10
                                                                                                $37,
                                                                                      --------...........
Cost ofmaintenance----------------------------------------------- ------------------------ ------------
                                     ..-----
                         ......----------
Total expended..................----                 ------------------------- ------------             37, 169.61
Allotted..-..-   ---..-----------------
                                     --       -------     -               ------------------------      47,000.00

Amount allotted from National Industrial Recovery Act approved
  June 16, 1933-------------------------- -------------------- $47, 000. 00
Gross amnounit expended----------------------------  $37, 174. 61
Less receipts fr'om sales_-                                 5. 00
                                                                  37, 169.61
      Balance unexpended June 30, 1934       __________-_______9, 830. 39
Outstanding liabilities June 30, 1934 ___________________________ 188.85

      Balance available June 30, 1934________________________                                         9,641. 54
Accounts receivable June 30, 1934____-- ___________---___________                                       314. 36

        Unobligated balance available June 30, 1934_______________                                   9, 955. 90

        6. TWITCH COVE AND BIG THOROUGHFARE RIVER, MD.

   Location.--This is-a tidal waterway about 4 miles long traversing
Smiths Island, Md., in a southeasterly direction from Chesapeake
Bay on the west to Tangier Sound on the east. (See U. S. Coast and
Geodetic Survey Chart No. 78.)
   Existing project.-This provides for a channel 5 feet deep at mean
low water and 25 feet wide from Twitch Cove on Tangier Sound
through Big Thoroughfare River to a point on Levering Creek about
800 feet north of the canal at Ewell, Md., and for a channel 4 feet
deep and 25 feet wide around the point between Big Thoroughfare-
River and Tylers River. The length of the section included in the
project is about 4 miles. The mean range of tide is 1.7 feet and the
extreme tidal range is 3 feet under ordinary conditions. The esti-
mate of cost for new work, revised in 1930, was $14,900. The latest
 (1930) approved estimate for annual cost of maintenance is $200.
The existing project was adopted by the River and Harbor Act of
July 25, 1912 (H. Doc. No. 285, 62d Cong., 2d sess.), which provided
for a 4-foot channel, and the River and Harbor Act of July 3, 1930
 (H. Doc. No. 313, 71st Cong., 2d sess.), provided for the 5-foot
channel. The latest published map is in the last-mentioned
document.
                  RIVERS AND HARBORS-BALTIMORE,                              MD., DISTRICT                            285

  Local cooperation.--Fully complied with.
  Terminal facilities.-There are nine small open-pile wharves pri-
vately owned open to general public use, which are considered ade-
quate for existing commerce.
  Operationsand results during fiscal year.-No operations were con-
ducted in the field as project depth was found to exist in the channel.
The total costs were $258.61 all for maintenance, and expenditures
were the same.
  Condition at end of fiscal year.-The existing project was com-
pleted in 1931 and is in fair condition. The controlling depths are
the project depths, except in the section between the Big Thorough-
fare River and Tylers River, where it is 3.5 feet, ascertained in
August 1933. The cost and expenditures have been $12,400 for new
work, and $758.61 for maintenance, a total of $13,158.61.
  Proposed operations.-No funds are available and no work is pro-
posed during the fiscal years 1935 and 1936.
                                     Cost and ftnancial summary

Cost of new work to June 30, 1934___----.-----.----------.      $12, 400. 00
Cost of maintenance to June 30, 1934---------------------------      758. 61

           Total cost of permanent work to June 30, 1934__-- ------                                            13, 158.61

           Net total expenditures----------------------- ----                                                  13, 158. 61

              Total amount appropriated to June 30, 1934__-----------                                          13, 158. 61

          Fiscal year ending June 30                1930          1931             1932               1933          1934

Cost of new work.......-----------...........------------------- $7, 644. 20 $1, 855. 80
Cost of maintenance-----------.... ---------- ----------------------------------            ir_                r


Total expended_............__........_                         3,892.01
                                                        __________             5,607.99           .      .--          258. 61

Allotted.......-----------------   ---------        -----       12,000.00    -2,   500.00    ...........---------     258.61

Amount allotted from War Department Appropriation Act approved
Mar. 4, 1933     ---------------------------------------              $4, 000. 00
Deductions on account of revocation of allotment and impounded
funds--------------                 ---------------------------------  3, 741.39

      Net amount to be accounted for --------------------                                                           258. 61
Gross amount expended-------------------------------------                                                          258. 61

                                   7. TANGIER CHANNEL, VA.

   Location.-This is a tidal channel about 1 mile long, extending
from Tangier Island, Va., in a northeasterly direction to deep water
in Tangier Sound, Chesapeake Bay. (See U. S. Coast and Geodetic
Chart No. 1223.)
   Existing project.-This provides for a channel 5 feet deep at
mean low water and 50 feet wide, increased at entrances and on
curves from Tangier Sound to Tangier with an anchorage basin 400
feet square of the same depth. The length of the section included in
the project is 1 mile, its lower end extending into Tangier Sound. The
mean range of tide is 1.7 feet and the extreme tidal range is 4.7 feet
under ordinary conditions. The estimate of cost for new work made
in 1913 was $16,434. The latest (1922) approved estimate for an-
286    REPORT      OF CHIEF OF ENGINEERS,          U.   S. ARMY,           1934


nual cost of maintenance is $500. The existing project was adopted
by the River and Harbor Act of March 2, 1919 (H. Doc. No. 107, 63d
Cong., 1st sess.). Supplementing the work authorized by Congress,
the provision of a straight channel 7 feet deep and 60 feet wide from
the 7-foot contour in Tangier Sound to the town of Tangier, with an
anchorage basin adjacent to the town, 400 feet square and 7 feet deep,
as recommended by the Chief of Engineers in Rivers and Harbors
Committee Document No. 51, Seventy-second Congress, second ses-
sion, at an estimated cost of $37,000, with maintenance estimated at
$1,000 annually, in addition to that now required for the adopted
project, was included in the public-works program under the National
Industrial Recovery Act.
   Recommended modifications of project.-Included in public-works
program.
   Local cooperatio.--The work included in the public-works pro-
gram is subject to the provision that local interests furnish, free of
cost to the United States, suitable areas for the disposal of dredged
material during initial construction and future maintenance as and
when needed. This has been complied with.
   Terminal facilities.-There are three bulkhead wharves having an
aggregate frontage of approximately 250 feet. These wharves are
open to all free of charge. Any considerable increase in commerce
would create a demand for additional facilities.
               OPERATIONS   AND   RESULTS   DURING      FISCAL     YEAR


  Project adopted by Congress.-No work, no costs, and no expendi-
tures.
  Project adopted by Public Works Administration.-Work under
contract for completion of this project by dredging was commenced
March 16, 1934, and was in progress at the end of the fiscal year.
Of the 6,800 feet of channel, 4,820 feet was completed. The total
cost for new work was $27,705.70. The expenditures were $21,681.66.
                       CONDITION AT END OF FISCAL YEAR


  Projectadopted by Congress.-The existing project was completed
in 1922 at a saving of $806 under the estimated cost. The total
costs and expenditures on the existing project have been $15,627.98
for new work and $7,789.57 for maintenance, a total of $23,417.55.
  Project authorized by Public Works Administration.-The project
is about 78 percent completed. The work remaining to be done to
complete the project is dredging 2,380 feet of channel and the 400
feet of anchorage. The controlling depth at mean low water is 0.2
feet, ascertained in June 1934. The total costs were $27,705.70, all
for new work. The expenditures were $21,681.66.
   Proposed operations.-The unexpended balance July 1, 1934, of
$15,557.46 from an allotment made by the Public Works Adminis-
tration, including accounts receivable of $239.12, will be applied as
follows:
Accounts payable July 1, 1934--_---------____-____-_________    $6, 263.16
New work: Completion of the project by contract dredging during
  the period July 1 to Aug. 10, 1934-------------... .    __     9, 294. 30
      Total-       -                         __------___---- __------15,          557.46
                RIVERS AND IIARBORS-BALTIMORE,                                                           MD.       DISTRICT                                 287

  No additional funds can be profitably expended during the fiscal
year 1936, as no maintenance is expected to be necessary.
                                      Cost aand financial summary
                                MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934_------------------------------                                                                        $15, 627. 98
Cost of maintenance to June 30, 1934__-                                                                                                   7,789. 57

      Total cost of permanent work to June 30, 1934------------   23, 417. 55
Net total expenditures-----------------------------------------   23,417. 55
Total amount appropriated to June 30, 1934-----------------------23, 417. 55

           Fiscal year ending June 30                        1930                  1931                    1932                  1933                 1934


Cost of new work-
Cost of maintenance-
                          -
                          ------.
                                     -    --...--
                                            - -
                                                                  -
                                                           $7, 766. 50-
                                                                          -       -      -        -        -   -       -     -     -     -    -
                                                                                                                                                  -
                                                                                                                                                        -
                                                                                                                                                            --

Total expended-----------------------                       7, 766. 50-
Allotted -      -- ------
                    -   ---
                          ---
                            - -----                           289. 57!        K                                        -UN


                                             PUBLIC WORKS FUNDS
Cost of new work to June 30, 194---$2--------------------------- $27,705. 70
Cost of maintenance to June 30, 1934-------------------------------------

      Total cost of permanent work to June 30, 1934-------------27, 705. 70
Plus accounts receivable June 30, 1934--                                . 12
                                                                    2-----------------------

     Gross total costs to June 30, 1934---------------------                                                                                 27, 944. 82
Minus accounts payable June 30, 1934-----      --------------                                                                                      263. 16
                                                                                                                                              6,6----

     Net total expenditures---__--    ------------------------ 21, 681. 66
Unexpended balance June 30, 1934----------                     15, 318. 34

           Total amount appropriated to June 30, 1934---------                                                                   __-_        37, 000. 00

           Fiscal year ending June 30                        1930                     1931                 1932                  1933                  1934


C ost of new w ork     ................       -...                        --............---...........                                  -.        $27, 705.70
Cost of m aintenance --..................            I.-                                                                                           -
Total expended ....------------------------------------                                                        -   -                                  21, 681. 66

Allotted          --------------------         ------------ ------------                                   ------- ------------                       37, 000. 00


Amount allotted from National Industrial Recovery Act approved
  June 16, 1933---------------------------------------------    $37, 000. 00
Gross amount expended    ------------------------- $21, 682. 66
Less receipts from sales------------------------          1. 00
                                                                 21, 681. 66

           Balance unexpended June 30, 1934 ---                                                   ------                         ___         15, 318. 34
Outstanding liabilities June 30, 1934 ---- ---                                                                     $6, 263. 16
Amount covered by uncompleted contracts-------------                                                                8, 926. 08
                                                                                                                                             15, 189. 24

      Balance available June 30, 1934----------------------- ---                                                                                      129. 10
Accounts receivable June 30, 1934------------------------------                                                                                       239. 12
             Unobligated balance available June 30, 1934---                                                                                           368. 22
Amount allotted from National Industrial Recovery Act_-                                                                                       5, 000. 00
             Balance available for fiscal year 1935_ ___-___-----------                                                                       5, 368. 22
           91536--ENG 1934--19
288          REPORT OF CHIEF OF ENGINEERS,                              U. S. ARMY, 1934

       CONSOLIDATFD         COST AND FINANCIAL SUMMARY                  FOR TANGIER CHANNEL,           VA.


Cost of new work to June 30, 1934_ --------      ------                             --           -1$43, 333.68
Cost of maintenance to June 30, 1934------------------                                                7, 789. 57

      Total cost of permanent work to June 30, 1934---------_                                    _   51, 123. 25
Plus accounts receivable June 30, 1934___                                                                239. 12

     Gross total costs to June 30, 1934--------------------------51, 362. 37
Minus accounts payable June 30, 1934                                , 263. 16
                                                                   6--------------------------
     Net tot al expenditures_------------------------------                                          45, 099. 21
Unexpended balance June 30, 1934                                                             _       15, 318. 34

         Total amount appropriated to June 30, 1934------------                          _           60, 417. 55

        Fiscal year ending June 30                   1930        1931        1932            1933        1934


Cost of new work_-----------        ------------------------------------------------                   $27, 705. 70
Cost of maintenance...------------------- $7, 766. 50
Total expended-------------------,,,-               7, 766. 50       ----                               21, 681. 66
A lotted..........---------------....------------     289. 57 ---------------                           37, 000. 00


Amount alloted fron' National Industrial Recovery Act approved
   June 16, 1933--------------------------------------------   $37, 000. 00

Gross amount expended----------------------------$21, 682.66
Less receipts from sales------------------------------  1. 00
                                                                                                     21, 681. 66

      Balance unexpended June 30, 1934-------------------------                                      15, 318. 34
Outstanding liabilities June 30, 1934------------------- $6, 263. 16
Amount covered by uncompleted contracts------------       8, 926. 08
                                                                                                     15, 189. 24

         Balance available June 30, 1934_
                                       ----------------------------                                     129.10
                                          --------------------------
         Accounts receivable June 30, 1934_                                                             239. 12

Unobligated balance available June 30, 1934-----------------------    368. 22
Amount allotted from National Industrial Recovery Act-----------   5, 000. 00

         Balance available for fiscal year 1935                                                       5, 368. 22

               8. OCEAN CITY INLET AND SINEPUXENT BAY, MD.

   Location.-Ocean City is on a barrier island between Sinepuxent
Bay and Atlantic Ocean and about 35 miles south of the entrance to
Delaware Bay. (See U. S. Coast and Geodetic Survey Chart No.
1220.)
   Existing project.-No work has been authorized by Congress.
   The construction of an inlet between the Atlantic Ocean and the
bay, with a depth of 10 feet and width of 2001 feet, protected by
jetties and a channel 8 feet deep and 100 feet wide from the inlet
through Sinepuxent Bay to Ocean City, and a channel 6 feet deep
and 150 feet wide from the inlet to Green Point, and thence 100 feet
wide into Chincoteague Bay, as recommended by the Chief of Engi-
           RIVERS AND HARBORS-BALTIMORE,               MD., DISTRICT           289
neers in Rivers and Harbors Committee Document No. 38, Seventy-
second Congress, first session, at an estimated cost of $781,000, of
which local interests are to contribute $500,000, is included in the
public-works program under the National Industrial Recovery Act.
The maintenance of the project is estimated at $30,000 annually. The
above-named document contains the latest published map.
   Local cooperation.-The State of Maryland is required to con-
tribute two-thirds of the first cost of the improvement, but not to
exceed $500,000; $150,000 has been contributed, and the balance is
available when called for.
   Terminal facilities.-Numerous wharves and landings of pile and
timber construction are located along the bay at Ocean City.
   Operations and results during fiscal year.-Work under contract
for placing protective stone on existing jetty was commenced Octo-
ber 23, 1933, and was completed January 4, 1934. Work of dredging
in Sinepuxent and Chincoteague Bays was commenced December 15,
1933, and was in progress at the end of the year. Work of con-
structing steel sheet pile bulkhead was commenced January 11 and
completed April 19, 1934, and construction of north jetty was com-
menced May 1, 1934, and was in progress at the end of the year.
The total cost, all for new work, was $286,053.38, of which
$188,815.38 were United States funds and $97,238 contributed funds.
The expenditures were $123,841.49 United States funds and $97,238
contributed funds, a total of $221,079.49.
   Condition at end of fscal year.-The project is about 30 percent
completed. The Sinepuxent Bay Channel was finished for a dis-
tance of 52,600 feet out of a total of 60,400 feet to project dimensions.
The controlling depth at mean low water over the remaining part
of the channel to the inlet is 2.5 feet. Core stone has been placed
in the north jetty for a distance of 776 feet out of a total of 1,346
feet. The work still to be done is dredging in inlet and approaches
and building of south jetty. The total costs were $286,053.38, of
which $188,815.38 were United States funds and $97,238 contributed
funds, all for new work. The expenditures were $221,079.49, which
includes $97,238 contributed by the State of Maryland.
   Proposed operations.-The unexpended balance July 1, 1934, of
$561,751.85 from an allotment made by the Public Works Adminis-
tration, together with funds contributed and to be contributed by the
State of Maryland, will be applied as follows:
Accounts payable July 1, 1934---------------------------------$71,939.02
New work: Completion of dredging in Sinepuxent and Chincoteague
  Bays and construction of north jetty and the construction of south
  jetty at entrance to Ocean City Inlet, and dredging through the
  inlet and bay by contract during the period July 1 to Dec. 31, 1934_ 489, 812. 83

      Total-------------------------------------------------            561, 751. 85
  The additional sum of $30,000 can be profitably expended during
the fiscal year 1936 for maintenance of channels and jetties.
290         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

                                      Cost and financial summary
                                            UNITED STATES FUNDS

Cost of new work to June 30, 1934___----------------                                                        ----                    $188, 815. 38
Cost of maintenance to June 30, 1934_________________1                                                                              -----------
      Total cost of permanent work to June 30, 1934___________                                                                       188, 815.38
Value of plant, materials, etc., on hand June 30, 1934_____________                                                                    5, 133. 79

      Net total cost to June 30, 1934__________________--________                                                                    193,949. 17
Plus accounts receivable June 30, 1934__________________________                                                                       1, 831.34

       Gross total costs to June 30, 1934___- __________________                                                                     195, 780. 51
Minus 'accounts payable June 30, 1934_______________________                                                                          71, 939. 02

     Net total expenditures ________--- ________-                                                            ____                    123, 841. 49
Unexpended balance June 30, 1934 ...           __                                                                                    157, 158. 51
         Total amount appropriated to June 30, 1934____________                                                                      281, 000. 00

        Fiscal year ending June 30                               1930              1931                   1932               1933              1934

Cost of new work          --   ----------               --....                .      .         ..-------         ..                  .     $188, 815. 38
Cost of maintenance-- .------------                                                                  --

Total expended      __----------------              -            --------------.                                                            i123,841. 49
Allotted .-------      --------------------------                          ----          --...------------ ....-----------                  281,000. 00


Amount allotted from National Industrial Recovery Act approved
  June 16, 1933-----------------------------------           ---- $281, 000. 00
Gross amount expended ____________-__________        $221,782.73
Less:
    Reimbursements collected ---------- $97, 900. 24
    Receipts from sales ----    -          -
                                   -__-_____- 41. 00
                                                       97, 941.24
                                                                   123, 841.49
      Balance unexpended June 30, 1934   -     -----------                                                                           157, 158.51
Outstanding liabilities June 30, 1934- -            $23, 979. 67
Amount covered by uncompleted contracts---------- 50, 573. 84
                                                                                                                                         74, 553. 51

      Balance available June 30, 1934_____________----  --                                                         -   -                 82, 605.00
Accounts receivable June 30, 1934-- --- _--------------------                                                                             1, 831.34

Unobligated balance available June 30, 1934 ___________________                                                                          84, 436.34
Amount that can be profitably expended in fiscal year ending June
  30, 1936, for maintenance 1_____________30,                                                                                                 000. 00


                                              CONTRIBUTED FUNDS

Cost of new work to June 30, 1934 ---  ___----______-_____-$97, 238. 00
Cost of maintenance to June 30, 1934__________________________
         Total cost of permanent work to June 30, 1934_-------__                                                                         97, 238. 00

     Net total expenditures_________________________                                                                                      97, 238.00
Unexpended balance June 30, 1934___--__   __-----_______                                                                                  52, 762. 00

          Total amount contributed to June 30, 1934 __--_____-______                                                                     150, 000. 00
   1Exclusive     of available funds.
                  RIVERS AND HARBORS-BALTIMORE,                                            1VD.,       DISTRICT                     291

           Fiscal year ending June 30                            1930           1931            1932       1933              1934


Cost ofnew work-              __                   -__        I-----------                                               $97, 238. 00
Cost of maintenance ..-----------------------                                                                        ............


Total expended-----------------------------                                                                                97, 238. 00
Contributed -.           . -- - -            - -         -     - - -                                                    150, 000. 00


Amount contributed by State of Maryland-------------          $150, 000. 00
                                                         -______
Gross amount expended----------------------------------------    97, 238. 00

      Balance unexpended June 30, 1934_ ___---_______---___-                                                        52, 762. 00
Outstanding liabilities June 30, 1934 _----___--   ___ $47, 959. 35
Amount covered by uncompleted contracts___       ___   101, 147. 68
                                                                                                                   149, 107. 03

           Balance available June 30, 1934_ __..______________                                                    --96,345. 03

Amount (estimated) required to be contributed for completion of
   existing        project 1----                         --        --   _______350,                                         000. 00

           CONSOLIDATED             COST     AND FINANCIAL                    SUIMMARY     FOR OCEAN' CITY, MD.

Cost of new work to June 30, 1934___--                                  __-       ______________            __ $286, 053. 38
Cost of maintenance to June 30, 1934

      Total cost of permanent work to June 30, 1934____-        -____-286, 053. 38
Value of plant, materials, etc., on hand June 30, 1934___________       5,133:79
      Net total cost to June 30, 1934________________________                                                      291,187.17
Plus accounts receivable June 30, 1934__--______--
                                               ---......    ____.                                                    1, 831. 34

      Gross total costs to June 30, 1934 -----------------    2.93, 018. 51
Minus accounts payable June 30,, 1934_________________________71, 939. 02

      Net total expenditures----------------------------------                                                     221, 079. 49
Unexpended balance June 30, 1934_________-__                                                                       209, 920. 51
           Total amount appropriated and contributed to June 30, 1934_                                             431, 000. 00

           Fiscal year ended June 30                             1930            1931           1932       1933               1934


Cost ofnew work-------                ------------------                                                              $286,  38
                                                                                                                          053.
Cost of maintenance -------- -----------------------------                                 ------        - -----                 ------
Total expended----------------------------------                                                                         221, 079. 49
Allotted and contributed-----------.....------------                                    -----      ------------          431, 000. 00


Amount allotted from National Industrial Recovery Act approved
June 16, 1933-- ------------------------------------------- $281, 000. 00
Contributed by the State of Maryland___________________________ 150, 000. 00

      Amount to be accounted for______________________________                                                     431, 000. 00
Gross amount expended_-$___--   ___--__________        $319, 020. 73
Less:
    Reimbursements collected-----------   $97, 900. 24
    Receipts from sales_________ ___--          41. 00
                                                         97, 941. 24
                                                                                                                   221, 079. 49

           Balance unexpended June 30, 1934_
                                          ------------------------ 209, 920. 51
   1 Exclusive of available funds.
292           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                            1934

Outstanding liabilities June 30, 1934_1111111111                                    $71, 939. 02
Amount covered by uncompleted contracts-----------                                  151, 721. 52
                                                                                                         $223, 660. 54

      Balance available June 30, 1934------------------------- -- 13, 740. 03
Accounts receivable June 30, 1934-------------------------------   1, 831. 34

            Unobligated balance available June 30, 1934-------------                                     -- 11, 908.69

Amount (estimated) required to be contributed for completion of
existing project_ ------------------------                     1350, 000. 00

Amount that can be profitably expended in fiscal year ending June
  30, 1936, for maintenance_------------------------------------                                          130, 000. 00

     9. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                 (GENERAL)

   The cost of work during the year amounted to $15,287.91; the ex-
penditures were $15,565.05. The balance unexpended June 30, 1934,
together with accounts receivable, $126.26, a total of $19,324.16, will
be applied as needed during the fiscal year 1935 to payment of
expenses incurred in connection with the above items.
  The additional sum of $15,000 can be profitably expended during
the fiscal year ending June 30, 1936.
                                          Cost and financial summary

Cost of maintenance to June 30, 1934_---------------------------   $74, 380. 31
Plus accounts receivable June 30, 1934----------------------------      126.26

      Gross total costs to June 30, 1934-------------------------74, 506. 57
Minus accounts payable June 30, 1934----------------------------     363. 82

     Net total expenditures-----------------------------------_                                              74, 142. 75
Unexpended balance June 30, 1934-------------------------------                                              19, 197. 90

            Total amount appropriated to June 30, 1934----------------                                       93, 340. 65

            Fiscal year ended June 30                1930          1931           1932            1933           1934


Cost of new work ..----
Cost of maintenance -------------------           $4, 974. 16    $8, 279. 80   $15, 091. 21   $21, 633. 22     $15, 287. 91
Total expended                                    5, 434. 53      8, 318. 61    14, 616. 59    21, 430. 59      15, 565. 05
Allotted.                                         4, 500. 00     14, 000. 00     7, 000. 00    24, 751.29       28, 089. 36


Balance unexpended July 1, 1933 ----------------------------                                                 $6, 673.59
Amount allotted from War Department Appropriation Act
   approved Apr. 26, 1934                         ------------                            $8, 000. 00
Amount         allotted from War              Department         Appropriation
   Act approved Mar. 4, 1933-------------------                                   ___     21, 000. 00
                                                                                         --              - 29, 000. 00

         Amount to be accounted for ------------------------------                                           35, 673.59

   1Exclusive of available funds.
                  RIVERS AND HARBORS-BALTIMORE,                                    MD., DISTRICT                          293
Deductions on account of revocation of impounded funds-----------                                                    $910. 64

      Net amount to be accounted for --         _________-_______-      34, 762.95
Gross amount expended _______________---------__-_ $26, 509. 25
Less reimbursements collected___-----_------ ----------     10, 944. 20
                                                                        15, 565. 05

      Balance unexpended June 30, 1934____      __________________ 19, 197. 90
Outstanding liabilities June 30, 1934----------------------            586. 42

      Balance available June 30, 1934---                                                                           18, 611.48
                                                                                                                   1-------------
Accounts receivable June 30, 1934-----------------------------                                                         126. 26

          Unobligated balance available June 30, 1934_--____--                                      _ ____         18, 737. 74

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1_____------_______________            15, 000. 00

                   10. Other projects for which no estinmates are submitted
          [Commercial statistics for these projects are given in part 2 of the report]


                                                                  For last   Cost and expenditures to
                                                                  full re-         June 30, 1934                    Estimated
                       Name of project                            port see                                           amount
                                                                  Annual                                           required to
                                                                     port    New work         Maintenance           complete



1. Susquehanna River above and below Havre de                         1931   $270, 664. 40      $44, 255. 60       Completed.
     Grace, Md.1
2. Elk and Little Elk Rivers, Md.1 2 3               __ _ _           1932   490, 515. 37          44, 342.   35        Do.
3. Chester River, Md.1------------------------                       1932     55, 700. 94          49, 757.   78        Do.
4. Corsica River, Md._------------------------                       1932     39, 070. 85          17, 611.   85        Do.
5. Queenstown Harbor, Md.'--------------__                           1931     44, 858. 27          26, 314.   84        Do.
6. Claiborne Harbor, Md.l       ..-----------
                                    1                                1933     42, 973. 65          48, 584.   27        Do.
7. Tilghman Island Harbor, Md. ----------------                      1922          29. 73                  __      $7,790.9
8. Tred Avon River, Md. _______.....              __         __      1923     12, 692. 87           1, 140. 93     $22,000.10
9. LaTrappe River, Md.l --------------------                         1922      8, 063. 87          15, 967. 97     Completed.
10. Choptank River, Md.l__---------------------_                     1931     84, 296. 34          21, 649., 83         Do.
11. Tuckahoe River, Md.' 6________________________                   1923      9, 727. 36           1, 092. 64          Do.
12. Warwick River, Md 1                  ___                         1922     22, 040. 82          24, 641. 00          Do.
13. Cambridge Harbor, Md.-                                           1931     81, 597. 56           6, 987. 30          Do.
14. Slaughter Creek, Md.-                                            1922      4, 140. 00              500. 00          Do.
15. Nanticoke River (including Northwest Fork),                      1923     48, 815. 31          26, 974. 69          Do.
      Del. and Md.1
16. Tyaskin Creek, Md. _________________________                     1923     16, 296. 63          18, 266. 39         Do.
17. Lower Thoroughfare
                   1      at or near Wenona, Deals                   1922     12, 200. 00              700. 00         Do.
      Island, Md.'
18. Crisfield Harbor, Md....
                      1                         ..---------------------
                                                                     1931    144, 950. 47           2, 839. 46          Do.
19. Broad Creek, Md. 7___ ..                 _____.._.......__       1932     28, 227. 19          38, 872. 17          Do.
20. Pocomoke River, Md.l                 _----------------- - 1922            34, 500. 00           8, 210. 02          Do.
21. Onancock River, Va.----------------------                        1931     89, 667.09           26, 983. 55     $55,500.
22. Nandua Creek, Va.-----------------------                         1932      6,987. 81---        _________       Completed.
23. Occohannock Creek, Va. l___-------------
                                      8-                      _ - 1933        13, 859. 14          14, 315. 20          Do.
24. Cape Charles City Harbor, Va. ...........               _        1920    105, 533. 68          39, 206. 37          Do.
25. Waterway on the coast of Virginia 1 _..----_                     1931      9, 404. 45          11, 802. 46          Do.
26. Little Machipongo River, Va.---------------                      1931     15, 000. 00                               Do.
27. Herring Bay and Rockhole Creek, Md.'1 -.               - _       1931      6, 300. 00      _                        Do.

  1 Channels adequate for commerce.
  2Revoked during fiscal year 1933, $50.28.
  3 Awaiting local cooperation for completion to full width for 1,500 feet at lower end of project.
  4 In addition $8,020 was expended from contributed funds.
  6Awaiting local cooperation for work in North Fork.
  6 Abandonment recommended in 1926.
  7 Revoked during fiscal year 1933, $49.63.
  8 Abandonment recommended in 1915.
  9 Insufficient potential commerce to justify the improvement and available funds ($7,790.27) were revoked.
  10Available funds for the North Fork revoked account noncompliance with terms of local cooperation.

   1 Exclusive of available funds.
294        REPORT          OF CHIEF OF ENGINEERS,                               U.          S.           ARMY   1934

Status of reports called for by river and harbor acts and comnittee resolutions


        Locality             Authorization Act      Transmitted                    Document number                    Recommenda-
                                                    to Congress                                                           tion
                                                                                                                 i~      -    -    -~
                      -1




Annapolis Harbor, Md__ Rivers and Harbors           Nov. 21, 1933               Rivers and Harbors                    Favorable.
                          Committee resolu-                                       Committee, 23, 73d
                          tion, Jan. 8, 1932.                                     Cong., 2d sess.
Back River, Md _____..  River and Harbor           Sept. 16, 1933                                                     Unfavorable.
                          Act, July 3, 1930.                                 .........................
Baltimore Harbor and Rivers and Harbors
  Channels, Md.           Committee resolu-
                          tion, Jan. 11, 1932.
Bear Creek, Md- __---   River and Harbor           Sept. 16, 1933                                                            Do.
                          Act, July 3, 1930.
Bradfords Bay, Va ..    Rivers and Harbors          Oct. 31, 1933                                                            Do.
                          Committee resolu-
                          tion, Mar. 14, 1932.
Colgate Creek, Md______ River and Harbor           Sept. 16, 1933                                                            Do.
                          Act, July 3, 1930.
Crisfield Harbor, Md___ Rivers and Harbors
                          Committee resolu-
                          tion, Feb. 27, 1934.
Curtis Creek, Md____ -- River and Harbor           Sept. 16, 1933                                                            Do.
                          Act, July 3, 1930.
Elk River, Md .____-__ Rivers and Harbors         ...............
                          Committee resolu-
                          tion, Aug. 7, 1934.
Hog Island, Va., to River and Harbor               July 17, 1933 ___                                                         Do.
 .Great Machipongo In-    Act, July 3, 1930.
let, channel.
    Do -.-- - - -        Rivers and Harbors
                           Committee resolu-
                           tion, Feb. 3, 1934.
Honga River and Tar Rivers and Harbors
  Bay (Barren Island       Committee resolu-
  Gaps), Md.               tion, Dec. 6, 1932.
Oyster, Va., to Atlantic River and Harbor
  Ocean, channel.          Act, Jan. 21, 1927.
                                                   Sept. 16, 1933                    -------------------                     Do.

Pocomoke River, Md., River and Harbor
  "The Muds."              Act, July 3, 1930.
                                                                                   --------------------
Pocomoke River, Md., Rivers and Harbors
  to Sinepuxent Bay,       Committee resolu-
                                                  ...............
                                                                                  ---------------------
  waterway.                tion, Mar. 15, 1934.
Pungoteague Creek, Va_ Rivers and Harbors
                           Committee resolu-
                                                                               ------ '-------'---------
                           tion, May 10, 1934.
Quinby Creek, Va....--   Rivers and Harbors
                           Committee resolu-
                           tion, Jan. 5, 1934.
Susquehanna River, Pa. Rivers and Harbors          Aug. 10, 1933                                                             Do.
  and Md.                  Committee resolu-
                           tion, Dec. 16, 1932.
    Do_--------------    Rivers and Harbors
                           Committee resolu-
                           tion, Mar. 15, 1934.
Tangier Sound, Va...... River and Harbor
                           Act, Jan. 21, 1927.
Tangier Sound to Chesa- Rivers and Harbors          Dec.            9,1933         -------------------                       Do.
  peake Bay via Ewell,     Committee resolu-
  Md.                      tion, Dec. 17, 1931.
    Do- -----------      Rivers and Harbors
                           Committee resolu-
                           tion, May 10, 1934.


IMPROVEMENT OF RIVERS AND HARBORS IN THE
         WASHINGTON, D. C.. DISTRICT
  This district includes the western shore of Chesapeake Bay be-
tween Cove Point on the north at the entrance to Patuxent River
and York Point on the south, at the mouth of the Poquoson River,
left bank, and all streams and their tributaries emptying into Chesa-
peake Bay between these limits. The more important rivers are the
Patuxent, Potomac, Anacostia, Rappahannock, York, Mattaponi,
and Pamunkey.
   District engineer: Maj. J. D. Arthur, Jr., Corps of Engineers, to
April 2, 1934; Capt. L. H. Hewitt, Corps of Engineers, to May 1,
1934; Lt. Col. John C. H. Lee, since that date.
        RIVERS AND HARBORS-WASHINGTON,            D. C., DISTRICT       295
  Division engineer: Col. T. H. Jackson, Corps of Engineers, to
June 28, 1934, and Col. Earl I. Brown, Corps of Engineers, since that
date.
                               IMPROVEMENTS

1. Potomac River at Washing- Page                                       Page
     ton, D. C--------------    295    7. Milford Haven, Va--------      304
2. Potomac River at Alexandria,        8. York River, Va----------       305
     Va----------------------_  297    9. Mattaponi River, Va-------     307
3. Potomac River below Wash-          10. Pamunkey River, Va -----       309
     ington, D. C___________    298   11. Examinations, surveys, and
4. Occoquan Creek, Va-------    300         contingencies (general) _    311
5. Rappahannock River, Va....   301   12. Other projects for which no
6. Urbanna Creek, Va---------   303         estimates are submitted__    312

             1. POTOMAC RIVER AT WASHINGTON, D. C.
   Location.-This river is formed by the juncture of the north and
south branches, about 21 miles below Cumberland, Md., and flows in
a generally southeasterly direction about 287 miles to Chesapeake
Bay, which it enters about 80 miles from the Atlantic Ocean. (See
U. S. Coast and Geodetic Survey Chart No. 560.)
   Previous projects.The act of July 11, 1870, adopted the original
project for improvement. The cost and expenditures under these
previous projects to 1882 were $339,475.21. For further details see
page 1791 of Annual Report for 1915.
   Existing project.-This provides for dredging the Virginia Chan-
nel 20 feet deep and of sufficient width (now about 600 feet) to
afford a low-water cross-sectional area of 25,000 square feet; for
dredging the Washington Channel at least 20 feet deep; for the
reclamation of the flats to 3 feet above the freshet elevation of 1877
by depositing the dredged material thereon; for the construction of
a tidal reservoir to periodically flush the Washington Channel; and
for the construction of a training dike in the Virginia Channel 7,207
feet long, of which 5,052 feet is riprap stone and 2,155 feet is earth.
The area included in the project extends from Giesboro Point, which
is 108 miles from the mouth of the river, 5 miles upstream to the
Francis Scott Key Bridge. The plane of reference is mean low
water. The tidal ranges are: Mean, 3 feet, extreme, 4.5 feet; irregu-
lar, 7.5 feet.
   The estimate of cost for new work, revised in 1897, was $2,953,020,
exclusive of amounts expended on previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $62,500.
   The existing project was adopted by the River and Harbor Act
of August 2, 1882 (S. Doc. No. 126, 47th Cong., 1st sess., and Annual
Report for 1882, p. 980). The latest published map is in the Annual
Report for 1914, page 1890.
   Terminal facilities.-The wharves in the Virginia Channel
 (Georgetown front), 10 in number, are, for the most part, bulkhead
structures of timber, stone, or concrete; such wooden-pile wharves
as do exist are narrow structures extending but little beyond the
bulkheads.
   All of the wharves in the Washington Channel, 30 in number, are
owned by the Federal Government, 26 under the supervision and
control of the District Commissioners and 4 under the immediate
supervision and control of the Chief of Engineers.
296       REPORT       OF CHIEF OF ENGINEERS,                U.   S.   ARMY,   1934

   The terminal and transfer facilities at Washington, D. C., are con-
sidered inadequate. Suitable terminal facilities should be provided.
   Operations and results during fiscal year.-Dredging by contract
between March 9 and May 11, 1934, removed 29,078 credited cubic
yards of material from a shoal in the Virginia Channel off the
mouth of Rock Creek at a cost of $12,722.83. Construction of first
stage of retaining levees for new deposit basin near Gravelly Point
was commenced May 4, 1934, and completed June 30, 1934, by the
U. S. derrick boat Benning; a total of 87,178 cubic yards of material
was placed in the retaining levee at a cost of $7,667.02. The tidal
gates were operated and repaired throughout the year at a cost of
$1,741.89. Miscellaneous surveys were made at a cost of $910.69.
   The total cost for the year was $34,096.07, all applied to mainte-
nance, of which $11,053.64 was charged to completed work. The
total expenditure for the year was $68,561.81.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1913. The controlling depth at mean low water in April
1934 was 17.8 feet in the Virginia Channel for a width of 400 feet,
and in June 1934, 21.4 in the Washington Channel.
   The total cost of the existing project was $3,628,937.34, of which
$1,919,425.38 was for new work and $1,709,511.96 for maintenance.
The total expenditures were $4,102,805.59.
   Proposed operations.--The balance unexpended and accounts
receivable July 1, 1934, will be applied as follows:
Accounts payable July 1, 1934___--___                                             $6, 176. 44
Outstanding obligations for credit overhead accounts, additions to
plant, etc__- ----         ------         ---       --                           13, 000. 00
Maintenance :
    Dredging in front of inlet gates, Tidal Basin, Wash-
      ington, D. C., with U. S. dredge (December 1934)__ $3, 000. 00
    Maintenance and repair of tidal gates, Tidal Basin,
      by hired labor (July 1934 to June 30, 1935) ..    _.. 5, 000. 00
    Surveys and investigations by hired labor (July
      1934 to June 30, 1935) -----------------------        2, 512. 41
                                                                                  10, 512. 41
Revolving fund to cover work for other Government departments,
  pending reimbursement of costs-----------------------------                     12, 000. 00
Balance remaining    ---------------------------------------                      88, 000. 00

       Total for all work____________---------- -1------1_                        29, 688. 85
  The sum of $234,000 can be profitably expended during the fiscal
year 1936, as follows:
Maintenance:
   Dredging Virginia Channel from railroad bridge to Rock Creek
      and at forks of the channel at Hains Point, Washington, D. C.,
      and deposit in basin at Gravelly Point, by contract (September
      1935 to April 1936) -------           ---------------------------- $128, 000
    Redredging from basin to deposit area by contract (September
      1935 to April 1936) __________------------_------___                 64, 000
    Dredging rehandling basin at Gravelly Point by contract (July
      and August 1935) --------------------------------------              23, 000
    Construction levees for deposit basin at Gravelly Point with U. S.
     derrick boats (July to October 1935)       -------------------                    12, 000
    Maintenance and repair of tidal gates, Tidal Basin, by hired labor
        (July 1935 to June 30, 1936) ------------------------------                     5, 000
      Surveys and investigations by hired labor (July 1935 to June
        30, 1936)             ---------------------------------------                   2, 000
          Total             ---------------------------------------------             234, 000
           RIVERS AND HARBORS-WASHINGTON,                                 D. C.1 DISTRICT                297
                                   Cost and financial summary

Cost of new work to June 30, 1934-- ---------------------- $2, 258, 900. 59
Cost of maintenance to June 30, 1934--------------------- 1, 709, 511.96

      Total cost of permanent work to June 30, 1934----------3, 968, 412. 55
Value of plant, materials, etc., on hand June 30, 1934---------- 403, 529. 26

      Net total cost to June 30, 1934-----------------------4, 371, 941. 81
Plus accounts receivable June 30, 1934------------------------- 76, 515. 43

      Gross total costs to June 30, 1934---------------------4, 448, 457. 24
Minus accounts payable June 30, 1934-------------------------     6,176.44

     Net total expenditures----- ------------------------ 4, 442, 280. 80
Unexpended balance June 30, 1934_---------------------        53, 173. 42

        Total amount appropriated to June 30, 1934-----------4, 495, 454. 22

   Fiscal year ending June 30          1930            1931            1932           1933            1934


Cost of new work .----------          .--------------         ------------------------------------
Cost of maintenance-------------$7, 986.25           $69, 805. 15   $14, 425. 55    $5,460. 64       $34, 096. 07

             ----------------
Total expended..                     221, 960. 03   -95, 304. 57     41, 115. 48    14, 379. 73       68, 561. 81

Allotted. ----------------------     171, 000. 00      5, 000. 00   -17, 000. 00   -12, 717. 09       43, 330. 95


Balance unexpended July 1, 1933------------------------------ $78, 404.28
Amount allotted from War Department Appropriation Act approved
Mar. 4, 1933_--   _--_---              ---------------        50, 000. 00

     Amount to be accounted for__------------------------ 128, 404.28
Deductions :
   Revocation of impounded funds-----------      $6, 069. 05
   Revocation of allotment                            00. 00
                                                     6------------------------
                                                                   6, 669. 05
      Net amount to be accounted for------------------------       121, 735. 23
Gross amount expended------------------------ $220, 828. 65
Less:
    Reimbursements collected---------- $150, 561.16
    Receipts from sales-------              1,705. 68
                                                      152, 266. 84
                                                                    68, 561. 81

      Balance unexpended June 30, 1934---------------------                                       53, 173. 42
Outstanding liabilities June 30, 1934----- ---------------------                                  16, 293. 77
     Balance available June 30, 1934----------------------                                         36, 879. 65
Accounts receivable June 30, 1934 -- -----------                                                   76, 515. 43

        Unobligated balance available June 30, 1934----___                                        113, 395. 08
Amount that can be profitably expended in fiscal year ending June
                                - - -- - -- - -- - -- - -- - -- - -- -- - -- - -
30, 1936, for maintenance 1                                                     234, 000. 00

                  2. POTOMAC RIVER                   AT ALEXANDRIA,                  VA.

   Location.--Alexandria, on the right bank of the Potomac River,
is 5 miles below Washington, D. C., and 105 miles above the mouth
of the river.  (See U. S. Coast and Geodetic Survey Chart No. 560.)

  1Exclusive of available funds.
298       REPORT       OF CHIEF OF ENGINEERS,              U.   S.   ARMY,   1934

  Existing project.--This provides for a depth of 24 feet in front of
Alexandria between the through channel and a line drawn 20 feet
outside of the established pierhead line. This area is about 6,700
feet in length and averages 300 feet in width. The lower end of the
improved section is 104 miles from the mouth of the river. The
plane of reference is mean low water. The tidal ranges are: Mean,
3 feet; extreme, 4.5 feet; irregular, 6 feet. The estimate of cost for
new work, made in 1908, is $116,000. The latest (1928) approved
estimate for annual cost of maintenance is $5,500.
   The existing project was adopted by the River and Harbor Act of
June 25, 1910 (H. Doc. No. 1253, 60th Cong., 2d sess.). The latest
published map is in the project document.
   Terminal facilities.-Alexandria has 16 regular shipping wharves
or landings. Eleven of these are wooden-pile structures. The others
are solid-fill bulkhead piers or bulkhead landings. The terminal and
transfer facilities are considered adequate for existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1912 at a saving of $20,786 under the estimated cost.
   The controlling depth in April 1934 was 14 and 20 feet at mean
low water for the upper and lower sections, respectively, of the
improvement.
   The costs and expenditures were $95,214.52 for new work and
$88,726.32 for maintenance, a total of $183,940.84.
   Proposed operations.-No funds are available but an allotment
will be made after bids are received for dredging approximately
300,000 cubic yards from the Alexandria waterfront between October
1934 and April 1935.
   No additional funds can be profitably expended during the fiscal
year 1936, as it is not believed that maintenance will be necessary
during that year.
                                 Cost   and   financial summary

Cost of new work to June 30, 1934_______________________________ $95, 214. 52
Cost of maintenance to June 30, 1934-----------------------------88, 726. 32
      Total cost of permanent work to June 30, 1934-------------- 183, 940. 84
Net total expenditures-------------                               183, 940. 84
Total amount appropriated to. June 30, 1934      _183,                 940. 84

              3. POTOMAC RIVER BELOW WASHINGTON, D. C.

  Location.-Forlocation of the Potomac River see page 295. (See
U. S. Coast and Geodetic Survey Charts Nos. 557, 558, 559, and 560.)
  Existing project.-This provides for securing by dredging a chan-
nel 24 feet deep at mean low water and 200 feet wide between the
mouth of the river and Washington, D. C., a distance of 108 miles.
The tidal ranges are: Mean, 1.3 feet at the mouth, 3 feet at Wash-
ington; extreme, 2 feet at the mouth, 4.5 feet at Washington; irreg-
ular, 2.4 feet at the mouth, 7.5 feet at Washington. The estimate
of cost for new work made in 1891 was $158,400. The latest (1928)
approved estimate for annual cost of maintenance is $20,000.
  The existing project was adopted by the River and Harbor Act
of March 3, 1899 (H. Doc. No. 33, 52d Cong., 1st sess.). The latest
published map is in the Annual Report for 1902, page 1038, and in
House Document No. 859, Sixtieth Congress, first session.
                RIVERS AND HARBORS-WASHINGTON,                                    D. C., DISTRICT                299
   Terminal facilities.-In general, the improvement is a main river
,channel, so that terminal facilities are only served where the channel
runs close to either bank of the river. In all, 23 wharves are thus
served. These wharves are of open and solid fill construction and
bulkhead type. The facilities are considered adequate for the exist-
ing commerce. For further details see page 435, Annual Report for
1932.
   Operationsand results during fiscal year.-The U. S. derrick boat
Atlas 'was engaged from April 6 to 18, 1934, in dredging channel at
entrance to Little Wicomico River, a tributary of the Potomac River
below Washington, D. C., under the provisions of Section 3 of the
River and Harbor Act of July 3, 1930, removing 8,815 cubic yards
of material.
   The total costs and expenditures for the year were $1,000, all
:applied to maintenance.
     Condition at end of fiscal year.-The existing project was com-
pleted in 1905, at a saving of $4,564 under the estimated cost. The
channels :are in fair condition, with controlling depths in June 1933
:as follows:

                                                      Con-                                                       Con-
                                                     trollin                     Name of bar                  trolling,
                                                                                                              t
                           Shoal                     depth
                                                      (feet)                                                    (feet)

Naval Magazine --.................                  -     23. 5    Upper Smith Point_                               23. 5
Marshall Hall -                                           21. 7    Lower Smith Point-Maryland Point.                22. 0
Mattawoman ----                                           24. 0    Kettle Bottom-     .. -_ - --------              24. 0


  The costs and expenditures were $153,836 for new work and
$300,380.76 for maintenance, which includes $1,000 for Little
Wicomico River, a total of $454,216.76.
  Proposed operations.-None. No funds available.
  The sum of $120,000 can be profitably expended during the fiscal
year 1936, in redredging Naval Magazine, Marshall Hall, Matta-
woman, Smith Point, and Maryland Point shoals by contract dur-
ing the period July to December 1935. Five of the seven shoals
that have required maintenance in the past will require redredging.
                                        Cost and financial sumnmary

  ost of new work to June 30, 1934___                                                                  $153, 836. 00
  ost of maintenance to June 30, 1934------------------------_                                          300, 380. 76
       Total cost of permanent work to June 30, 1934 ...........  454, 216. 76
Net total expenditures___                                        454, 216. 76
total amount appropriated to June 30, 1934----------------------454, 216. 76

           Fiscal year ending June 30                   1930          1931         1932         1933         1934

Dost of new work-                                                      ----------                          $1
ost of maintenance______            ______------       $27. 49       $299. 88   $2,317. 54                   , 000. 00
                 ---- _---------
  otal expended--..-                                      33. 09        27. 85    2, 589. 57     ----        -1, 000. 00
                   --------------
  lotted_____------------_                          2,506.03         4,500.00    -1,882.58------------_      1, 000.00
300     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

Amount allotted from War Department Appropriation Act approved
July 14, 1932_ --------------------------------------             $400. 00
Amount allotted from War Department Appropriation Act approved
Mar. 4, 1933      -----------------------------------------        600. 00
      Amount to be accounted for--------------------------- 1, 000. 00
Gross amount expended------------------------------------1, 000. 00

Amount that can profitably be expended in fiscal year ending June
30, 1936, for maintenance_   ------------------------------- 120, 000. 00

                       4. OCCOQUAN CREEK, VA.

   Location.-This creek is formed by the junction of Bull and Broad
Runs, about 5 miles southeast of Manassas, Va., and flows about 13
miles in a southeasterly direction, emptying into the Potomac River
about 26 miles below Washington, D. C. (See U. S. Coast and
Geodetic Survey Chart No. 560.)
   Previous projects.-The first project was adopted by the River and
Harbor Act of March 3, 1873. The appropriation thereunder
amounted to $25,000, all of which was expended by 1880. For
further details see page 1792, Annual Report for 1915.
   Existing project.-This provides for dredging a channel 6 feet
deep at mean low water and 150 feet wide from deep water in the
Potomac River to Taylors Point, and thence 100 feet wide to the
town of Occoquan, 6 miles from the mouth, and the protection of
the channel above Taylors Point by riprap-stone dikes 2,220 feet
long. The plane of reference is mean low water.
   The tidal ranges are: Mean, 2 feet; extreme, 3 feet; irregular, 5
feet. The estimate of cost for new work, revised in 1907, is $64,000,
exclusive of amount expended on previous projects. The latest
 (1923) approved estimate for annual cost of maintenance is $3,000.
   The existing project was adopted by the River and Harbor Act of
September 19, 1890 (H. Doe. No. 75, 51st Cong., 1st sess.); was
modified December 5, 1890 (see Annual Report for 1890, p. 1089, and
for 1891, p. 1254); and was extended by River and Harbor Act of
March 2, 1907 (H. Doc. No. 190, 59th Cong., 1st sess.). The latest
published map is in House Document No. 661, Sixty-third Congress,
second session.
   Terminal facilities.--There are 10 landings or wharves in Occo-
quan Creelg. The principal terminal is solid fill and open-pile
structure; all the other wharves or landings are solid bulkhead
structures. The terminal facilities are considered sufficient for the
present traffic.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project is 92 percent
completed; the only work remaining to be done is the construction
of the dike at Upper Mud Bar, which is not at present considered
necessary. Stone dikes aggregating 1,953 feet in length and con-
taining 7,827.6 cubic feet of riprap stone were built, and channels
aggregating 2.6 miles were dredged and redredged, 705,993 cubic
yards being excavated. The controlling depth April 1933 was 5.5
feet at mean low water.
   The cost and expenditures were $41,252.95 for new work and
 $73,027.63 for maintenance, a total of $114,280.58.
             RIVERS AND HARBORS-WASHINGTON,                                     D. C.         DISTRICT                301
  Proposed operations.-The balance unexpended                                                   July         1, 1934,
$12,000, will be applied as follows:
Maintenance:
   Dredging Lower Mud and Outer Bars in downstream section of
      creek by contract (September and October 1984)--------------$9, 000
   Reinforcing levees of deposit basin with U. S. derrick boat (August
      1934) -----------------------------------------------            3, 000

          Total--              -----------------------------------------                                           12, 000
   No additional funds can be profitably expended during the fiscal
year 1936, as it is not believed maintenance will be necessary.
                                       Cost and financial sunvmary

Cost of new work to June 30, 1934--------------------------             $66, 252:. 95
Cost of maintenance to June 30, 1934----           -------------------- 73, 027. 63

          Total cost of permanent work to June 30, 1934-----------139., 280. 58
Net total expenditures ---. __----.                   __     -_____-139,                                         280. 58
Unexpended balance June 30, 1934                      --------------------------                             12, 000.00
          Total cost of permanent work to June 30, 1934 -----------                                         139, 280. 58

          Fiscal year ending June 30               1930             1931          1932              1933            1934

Cost of new work..------------------------
Cost of maintenance--___..                   ------------
                                  ______________                   $664. 56     $2, 384. 68    -.             .

Total expended----------------------------------                     155. 39     2, 893. 85            --
Allotted...------------------------------           $18. 33 -----------        -1, 950.76 ------------            $12, 000. 00


Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934     ------------------------------------------- $12, 000
Balance unexpended June 30, 1934-----------------------------12, 000
Amount (estimated) required to be appropriated for completion of
   existing project 1                                                                                              22, 700

                                 5. RAPPAHANNOCK RIVER, VA.

   Location.--Rises in Virginia, in the Blue Ridge Mountains, and
flows southeasterly about 212 miles to Chesapeake Bay, which it
enters about 40 miles north of Old Point Comfort.                                             (See U. S. Coast
and Geodetic Survey Charts Nos. 534, 535, 536.)
   Previous 'projects.-Adopted by the River and Harbor Act of
March 3, 1871, and modified in 1879. The cost and expenditures
under this project to 1905 were $310,645.83, of which $197,145.83 was
for new work and $113,500 for maintenance. For further details see
pa,ge 1793 of Annual Report for 1915.
  Existing project.-This provides for securing a channel 12 feet
deep at mean low water and 200 feet wide between the mouth and
Port Royal and 12 feet deep and 100 feet wide between Port Royal
and Fredericksburg by dredging and the construction of 20,401 feet
of crib and pile dikes and 1,906 feet of riprap-stone dikes, the latter
being also designed to retain the excavated material deposited behind
them. The length of section included in the project is 107 miles.
   1   Exclusive of available funds.
302     REPORT OF CHIEF            OF ENGINEERS, U.        S.   ARMY,     1934


The plane of reference is mean low water. The tidal ranges are:
Mean, 2.8 feet at Fredericksburg, 1.6 feet at Tappahannock; extreme,
3.5 feet at Fredericksburg, 2.5 feet at Tappahannock; irregular, 6
feet at Fredericksburg, 5 feet at Tappahannock. The estimate of
cost for new work made in 1905 was $171,000, exclusive of amount
expended on previous project. The latest (1926) approved estimate
for annual cost of maintenance is $22,000.
   The existing project was adopted by the River and Harbor Act of
March 3, 1905 (Annual Report for 1906, pp. 1110-1113). The latest
published map is in the Annual Report for 1910, page 1364.
   Terminal facilities.-In the section under improvement, extending
from Fredericksburg, Va., to Tappahannock, Va., a distance of 65
miles, there are 24 wharves, of which 9 are solid bulkhead type and
15 are open pile structures. From Tappahannock to the mouth there
are 16 open pile wharves. The existing terminals appear to be
adequate.
   Operations and results during fiscal year.-Dredgingby contract
was in progress from September 28, 1933, to February 22, 1934, a
total of 11,884 linear feet of channel was dredged through six bars,
depositing a total of 185,936 credited cubic yards (227,618 cubic yards
gross) back of levees or on river flats, at a cost of $35,073.54. The
U. S. derrick boat Atlas was engaged in snagging operations from
November 5 to December 7, 1933, and April 27 to June 12, 1934,
removing 2,086 snags and cutting 4,406 overhanging trees from the
channel and banks between Hopyard Bar and Fredericksburg, a
distance of 20 miles. The derrick boat, between June 13 and 18,
1934, removed 2,993 cubic yards of material from a small shoal. The
total cost of the derrick boat work was $7,248.23. Under the provi-
sions of section 3 of the River and Harbor Act of July 3, 1930, the
U. S. derrick boat Atlas was engaged from April 19 to 26, 1934, in
dredging the entrance to Parrotts Creek, a tributary of the Rappa-
hannock River, removing 3,342 cubic yards of material and debris
at a cost of $994.59.
   The total cost for the year was $43,316.36, all applied to mainte-
nance and the expenditures were $41,536.39.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1910. The controlling depth June 1934 was 11.0 feet at
mean low water. The total cost of the existing project was $627,-
855.30, of which $217,487.20 was for new work and $410,368.10 for
maintenance, which includes $994.59 for Parrotts Creek. The total
expenditures were $626,075.33.
   Proposed operations.-The balance unexpended July 1, 1934,
$3,197.52, will be applied as follows:
Accounts payable July 1, 1934                                     __-------------_ $1, 779. 97
Payment of outstanding tow charges for snagging operations--------_                  417. 55
Maintenance: Dredging entrance to Greenvale Creek, Va. (under pro-
  visions of sec. 3 of River and Harbor Act of July 3, 1930'), United
  States derrick boat Atlas (September 1934) _----------------__ _                1, 000. 00
      Total ________ ________---
                             -         ___-------------_         _               3, 197. 52
              RIVERS AND HARBORS-WASHINGTON, D. C., DISTRICT                                                    303
  The sum of $32,000 can be profitably expended during the fiscal
year 1936 as follows:
Maintenance:
   Redredging channels, Port Royal to Fredericksburg, by contract
      (April-June 1936) --------------------             ---------------- $30, 000
   Protection of sand fills, Port Royal to Fredericksburg, with hired
      labor (July 1935 to June 1936) ----------------------                 2, 000
             Total __------------------------------                    ---------------------                 32, 000

                                         Cost and financial summary

Cost of new work to June 30, 1934_                                                                   $414, 633. 03
Cost of maintenance to June 30, 1934------------------------                                          523, 868. 10

     Total cost of permanent work to June 30, 1934-------------938, 501. 13
Minus accounts payable June 30, 1934                               , 779. 97
                                                                  1,-------------------------

      Net total expenditures ----------------------------          -- 936, 721. 16
Unexpended balance June 30, 1934__       ----------------------------   3, 197. 52

          Total amount appropriated to June 30, 1934--------------                                    939, 918. 68

          Fiscal year ending June 30               1930           1931          1932          1933            1934


Cost of new work__--------
Cost of maintenance------------- ------         $10, 090. 27   $65, 353. 25   $7, 157. 50   $1, 434. 70     $43, 316. 36
Total expended -----------------------            9, 903. 83    51, 247. 58   21, 414. 05    1, 470. 26      41, 536. 39

Allotted ----------------------------------      38, 217. 50    19, 000. 00    1, 500. 00     -29. 74        44, 733. 91


Amount allotted from War Department Appropriation Act approved
July 14, 1932__ ------------------------------------------- $1, 000. 00
Amount allotted from War Department Appropriation Act approved
Mar. 4, 1933--     ----------------------------------------   44, 000. 00

     Amount to be accounted for---------------------------         45, 000. 00
Deductions on account of revocation of impounded funds------------     266.09
      Net amount to be accounted for------------------------                                              44, 733.91
Gross amount expended--     ------------------------------                                                41, 536. 39
      Balance unexpended June 30, 1934-----------------------                                              3, 197. 52
Outstanding liabilities June 30, 1934---------------------------                                           1, 779. 97
       Balance available June 30, 1934------------------------1,                               417. 55
Amount that can be profitably expended in fiscal year ending June 30,
                          - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - -
  1936, for maintenance 1                                                                  32, 000. 00

                                         6. URBANNA CREEK, VA.

   Location.-Urbanna Creek rises in Virginia, flows in an easterly
direction about 5 miles to the Rappahannock River, which it enters
about 15 miles above its mouth. (See U. S. Coast and Geodetic
Survey Chart No. 535.)
   Existing project.-This provides for dredging a channel 150 feet
wide and 10 feet deep, at mean low water, nine-tenths of a mile
    1Exclusive   of available funds.
          91536--ENG 1934-20
304           REPORT      OF CHIEF OF ENGINEERS,                         U.   S. ARMY,        1934

through the outer and inner bars, with a turning basin of the same
depth at the head of steamboat navigation, and for jetties to protect
the channel through the outer bar. The jetties are 2,612 feet long--
1 of riprap 1,895 feet long, and 1 of timber 717 feet long. The
plane of reference is mean low water. The tidal ranges are: Mean,
1.5 feet; extreme, 2.5 feet; irregular, 4.5 feet. The estimate of cost
for new work, revised in 1897, was $70,000. The latest (1917)
approved estimate for annual cost of maintenance is $1,000.
   The existing project was adopted by the River and Harbor Act
of March 3, 1879 (Annual Report for 1875, vol. 2, p. 139). It was
modified in 1883, 1888, and 1897. The latest published map is in
the Annual Report for 1890, page 1070.
   Terminal facilities.-This waterway has 11 improved wharves of
open-pile construction, and a marine railway. There are several
shore landings intermittently used by craft for embarking lumber,
and there are several small wharves used for private purposes and of
no commercial importance. These facilities are considered adequate.
    Operations and results during fiscal year.-None.
    Condition at end of fiscal year.-The project was completed in 1914
at a saving of $31,188 under the estimated cost. The jetties were
finished in 1913, the dredging in 1914. The stone jetty is in good
condition; about 70 percent of the timber dike has been destroyed.
The controlling depth in August 1933 was 9.5 feet at mean low water.
The costs and expenditures were $38,811.77 for new work and
$42,930.39 for maintenance, a total of $81,742.16.
   Proposed operations.-None. No funds are available.
   The sum of $6,000 can be profitably expended during the fiscal year
1936 in redredging the entrance channel at Urbanna by contract
during September 1935. The last maintenance under the project was
in 1931.
                                     Cost and finanoial surmmary

Cost of new work to June 30, 1934__________-----_______-__  - $38, 811. 77
Cost of maintenance to June 30, 1934_______________________    42, 930. 39

      Total cost of permanent work to June 30, 1934______________                                  81, 742. 16
Net total expenditures________   -------------------                                               81, 742. 16
Total amount appropriated to June 30, 1934_______________________                                  81, 742. 16

        Fiscal year ending June 30                     1930      1931          1932         1933       1934

Cost of new work ----------------- --------
Cost of maintenance        .   . ------         ----           $9, 525. 69     $474. 31
Total expended-     ----------------      ------------------    7, 173. 15    2, 826. 85-                 -

Allotted---    ..     ..-----------------------------------    10,000.00


Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance_____-------------------                $6, 000

                                       7. MILFORD HAVEN, VA.

  Location.-Milford Haven in Mathews County, Va., is a tidal
estuary or strait on the western shore of Chesapeake Bay, about 35
miles north of Old Point Comfort. It lies between Gwynns Island
and the main shore at the mouth of the Piankatank River.
        RIVERS AND    IARBORS-WASHINGTON,         D. C., DISTRICT        305

   Existing project.-This provides for dredging a channel 10 feet
deep at mean low water, with a minimum width of 200 feet, through
the bars at the northwest entrance and between Cricket Hill and
Callis Wharf, a distance of 1 mile, and for the construction of a
stone jetty 1,183 feet long at the northwest entrance. The plane of
reference is mean low water. The tidal ranges are: Mean, 1.3 feet;
extreme, 2 feet; irregular, 4 feet. The estimate of cost of new work,
modified in 1909, was $27,500. The latest (1917) approved estimate
for annual cost of maintenance is $1,000.
    The existing project was adopted by the River and Harbor Act of
March 3, 1899 (H. Doc. No. 299, 53d Cong., 3d sess., and annual
report for 1895, pp. 1267-1270), extended by River and Harbor Act of
June 6, 1900 for dredging of shoal within harbor and in 1906
 (Annual Report for 1906, p. 1114) and 1909 (Annual Report for
1909, p. 1241) for construction of jetty at entrance. The latest pub-
lished map is in House Document No. 299, Fifty-third Congress,
third session.
    Terminal facilities.-The waterway has eight improved wharves
of open pile construction and a small marine railway. The terminal
facilities are considered adequate for the present commerce.
    Operations and results during fiscal year. None.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1910 at a saving of $2,932 under the estimated cost. The
controlling depth December 1928 at mean low water was 11.2 feet on
the entrance bar and 9.5 feet on the inner bar.
    The costs and expenditures were $24,568.25 for new work and
 $3,673.94 for maintenance, a total of $28,242.19.
    Proposed operations.-None. No funds are available.
    The sum of $10,000 can be profitably expended during the fiscal
year 1936, in redredging by contract during July and August 1935,
shoal on inner channel which was last dredged in 1905.
                        Cost and financial summary

Cost of new work to June 30, 1934_                                  $24, 568.25
Cost of maintenance to June 30, 1934________________       _____      3,673.94
      Total cost of permanent work to June 30, 1934____-_______     28, 242. 19
Net total expenditures ________-___-____-
                                       -________                    28, 242. 19
Total amount appropriated to June 30, 1934__ -- ______-_____        28, 242. 19
Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance___________---__--_____-- -_               10, 000. 00

                           8. YORK RIVER, VA.

    Location.-This river is formed at West Point, Va., by the con-
fluence of the Mattaponi and Pamunkey Rivers, and flows south-
easterly about 41 miles into Chesapeake Bay, which it enters about
20 miles in a northerly direction from Norfolk, Va., and 20 miles in
a northwesterly direction from the Atlantic Ocean at Cape Henry.
  (See U. S. Coast and Geodetic Survey Charts: Nos. 494 and 495.)
    Existing project.-This provides for dredging a channel 22 feet
deep at mean low water and 400 feet wide through the bars, and a
basin of the same depth at the wharves at West Point, and the con-
struction of a dike on the right bank at West Point to assist in main-
306         REPORT OF     CHIEF OF ENGINEERS,             U. S.     ARMY,            1934

taining the channel. The plane of reference is mean low water.
The tidal ranges are: Mean 2.2 feet at mouth and 2.9 feet at West
Point, and the extreme 3.9 feet at mouth and irregular 6 feet at
West Point. The estimate of cost for new work, modified in 1887, is
 $308,800. The latest (1928) approved estimate for annual cost of
maintenance is $5,000.
   The existing project was adopted by the River and Harbor Act
of June 14, 1880 (Annual Report for 1880, p. 897). It was modified
in 1884 and 1887. The latest published map is in the Annual Report
for 1894, page 964.
   Terminal facilities.-There are 17 wharves on the York River of
open-pile construction. The facilities are considered adequate for
the existing commerce.
   Operations and results during fiscal year.--The U. S. derrick
boat Atlas was engaged from October 27 to November 1, 1933, in
removing shoal and snags from Poropotank Creek, a tributary of
the York River under the provisions of section 3 of the River and
Harbor Act of July 3, 1930, dredging 2,730 cubic yards of material
and removing 13 snags. The total costs and expenditures for the
year were $784.91, all applied to maintenance.
   Condition at end of fiscal year.-The project was about 75 percent
completed in 1899; the part not completed was the dredging of the
channels to the full project width of 400 feet, which was not con-
sidered necessary at that time, and subsequently the navigation on
the York River has not justified completing the project. A pile and
timber dike 10,142 feet in length was built at West Point, and chan-
nels aggregating 2.5 miles were dredged. The channels are in fair
condition and considered adequate for the present navigation, with
controlling depths as follows:

                          Name                              Depth       Width               Date

                                                             Feet         Feet
Poropotank Bar_-----                     --                    20. 6           300    March 1929.
West Point Bar                      __                         21. 5           200    February 1929.
Basin, West Point      --------------------------------        18.0    - - -     -    September 1933



   The dike at West Point is in poor condition.
   The costs and expenditures were $180,904.20 for new work and
$154,392.57 for maintenance, which includes $784.91 for Poropotank
Creek, a total of $335,296.77.
   Proposed operations.-The balance unexpended July 1, 1934, $200,
from allotment under provisions of section 3 of the River and Har-
bor Act of July 3, 1930, for work on Poropotank Creek, a tributary
of the York River, will be applied to maintenance contingencies as
may be necessary.
   The sum of $25,000 can be profitably expended during the fiscal
year 1936 in redredging the basin at West Point by contract in July
and August 1935.
   No funds are requested for new work to complete the project
as the enlargement of the channel and basin to full project dimen-
sions is not necessary for present navigation.
                 RIVERS AND HARBORS                 WASHINGTON,                  D. C., DISTRICT                           307
                                          Cost andCfinancial summary
Cost of new work to June 30, 1934-----------------------------                                                   $180, 904. 20
Cost of maintenance to June 30, 1934_-------------------------                                                    154, 392. 57
            Total cost of permanent work to June 30, 1934 -------------                                           335, 296. 77

Net total expenditures ----------------------------------------                                                   335, 296. 77
Unexpended balance June 30, 1934__________________________-                                                            200. 00

            Total amount appropriated to June 30, 1934                                                                  496. 77
                                                                                                                  3---------------35,

           Fiscal year ending June 30               1930            1931           1932                  1933            1934


Cost of new work___--------
Cost of maintenance---------------------             $13. 50     $24, 250. 09      $118. 58   --                          $784. 91

Total expended--------------------------              13 50       23, 813.58        555. 09        -                       784. 91
Allotted_ ----------------------------            29, 301. 21 ---------         -5, 431. 33            $1, 000. 00        -15. 09


Balance unexpended July 1, 1933___
                               -------------------        ------                                                     $1, 000. 00
Deductions on account of revocation of impounded funds -_______                                                           15. 09
      Net amount to be accounted for--------------------------__                                                        984. 91
Gross amount expended-                                                                                                  784. 91
                                                                                                                        7------------------------
           Balance unexpended June 30, 1934 --__--..----                                  ____               _          200. 00
Amount (estimated) required to be appropriated for completion of
existing project 1-------------------------------------------    128, 000. 00
Amount that can be profitably expended in fiscal year ending June
   30, 1936, for maintenance 1--                      --------                                             ___ 25, 000. 00

                                         9. MATTAPONI RIVER, VA.

  Location.-Rises in Virginia and flows in a southeasterly direction
for about 120 miles to its junction with the Pamunkey River at West
Point, Va., forming the York River. (See U. S. Coast and Geodetic
Survey Chart No. 504.)
  Previous projects.-Adopted by the River and Harbor Act of
June 14, 1880, and modified by River and Harbor Act of July 13,
1892. The cost and expenditures under this project were $111,689.71,
of which $51,249.48 was for new work and $60,440.23 for mainte-
nance. For further details see page 531 of Annual Report for 1918.
  Existing project.-This provides for securing a channel 51/2 feet
deep and 75 feet wide to Pointers and the removal of snags, logs,
and overhanging trees obstructing navigation to Dunkirk. The
length of the section in which snagging alone is provided, extending
from Pointers, 5 miles above Walkerton, Va., to Dunkirk, Va., is 8
miles. The distances from the mouth of the river to Walkerton,
:Pointers, and Dunkirk are 28, 33, and 41 miles, respectively. The
plane of reference is mean low water. The tidal ranges are: Mean,
3.9 feet at Walkerton, 2.9 feet at West Point; extreme, 4.5 feet at
Walkerton, 3.9 feet at West Point; irregular, 7 feet at Walkerton,
6 feet at West Point. The estimate of cost for new work made in
1915 was $7,000, but the project was completed without cost through
    1 Exclusive of available funds.
308     REPORT OF CHIEF OF          ENGINEERS,     U.   S. ARMY,     1934

maintenance operations under the previous project. The latest:
(1926) approved estimate for annual cost of maintenance is $3,500..
  The existing project was adopted by the River and Harbor Act
of March 2, 1919 (H. Doc. No. 861, 64th Cong., 1st sess.). The latest
published map will be found in Rivers and Harbors Committee.
Document No. 47, 73d Congress, first session.
  Recommended modifications of project.-Under date of June 15,
1934, the Chief of Engineers recommended that the existing project
be modified to authorize a channel 9 feet deep and 150 feet wide.
from the mouth to Locust Grove, a channel 7 feet deep and 100 feet
wide from Locust Grove to Rosespout, with a basin immediately
above Rosespout 7 feet deep, 180 feet wide, and 400 feet long, and
snagging between the mouth and Dunkirk, at an estimated cost of
$19,250 for new work and $4,500 annually for maintenance, which is
$1,000 more than that now required, subject to the condition that
local interests provide without cost to the United States suitable
areas for the deposit of dredged material. (Rivers and Harbors
Committee Doc. No. 47, 73d Cong., 2d sess.)
  Terminal facilities.-PointersWharf, a shore landing, is the prin-
cipal terminal in the portion of the waterway covered by the dredg-
mg project. In the portion of the waterway between Walkerton
and Pointers there are two shore landings. In the deeper portions
of the waterway below Walkerton, there are about 12 wharves of
open-pile construction and about 13 shore landings.
   Operations and results during fiscal year.-The U. S. derrick boat
Atlas was engaged from September 17 to October 26, 1933, in remov-
ing a total of 76 snags and 145 overhanging trees, and dredging 4,164
cubic yards of material from shoals in the channels, between Walker-
ton and Aylett, a distance of 10 miles.
   The total costs and expenditures for the year were $4,266.56, all
applied to maintenance.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1919. Channels aggregating 2.3 miles were dredged and
redredged, 88,183 cubic yards of material being excavated. The
channels are in good condition. The controlling depth in February
1934 was 6 feet at mean low water. 'The total costs and expenditures
were $45,857.22, applied to maintenance. No expenditure for new
work was made, as channels of project dimensions had been secured
by the operating requirements of hydraulic dredges under the previ-
ous project.
  Proposed operations.-The balance unexpended July 1, 1934, $200,
will be applied to maintenance contingencies as may be necessary.
   The sum of $8,000 can be profitably expended during the fiscal year
1936 in redredging the channels by contract during March and April;
1936.
                           Cost and financial summary

Cost of new work to June 30, 1934_ ___----------------------             $51,249. 48
Cost of maintenance to June 30, 1934_____--   ______-----------          106, 297. 45

      Total cost of permanent work to June 30, 1934          _________   157, 546. 93

Net total expenditures ____---------------  -157,                            546. 93
Unexpended balance June 30, 1934----------------------------                 200.00
       Total amount appropriated to June 30, 1934- -----------           157, 746, 98
              RIVERS AND HARBORS-WASHINGTON,                                         D. C., DISTRICT                 309

         Fiscal year ending June 30                       1930           1931         1932           1933          1934


Cost of iew work.-------------------------------------                                            -------------------------
Cost of maintenance_------------------               $5, 074. 37       $8, 910. 27    $595. 00       $233. 21     $4, 266. 56
Total cost      ------------------------------           5, 074. 37     8, 910. 27     595. 00        233. 21      4, 266. 56

Total expended-----------------------                    4, 893. 49     9, 091. 15     595. 00        233. 21      4, 266. 56

Allotted..-----------------------------9,                  860.18 .....----------    -648.   07       -6.40        4, 406.17


Balance unexpended July 1, 1933------------------------------$60.39
Amount allotted from War Department Appropriation Act approved
  Mar. 4, 1933--   -------------------------------------       4, 500. 00

Amount to be accounted for---------------------------------4,                                                     560. 39
Deductions on account of revocation of impounded funds------------                                                 93. 83

      Net amount to be accounted for-------------------------     4, 466. 56
Gross amount expended----------- ----------------- $4, 267. 45
Less reimbursements collected---------------------------      .89
                                                                  4, 266. 56

          Balance unexpended June 30, 1934------------------------200. 00

Amount that can be profitably expended in fiscal year ending June 30,
   1936, for maintenance 1---------------                                                                       8, 000. 00

                                     10. PAMUNKEY RIVER, VA.

   Location.-Rises in Virginia, flows in a southeasterly direction for
130 miles to its junction with the Mattaponi River at West Point,
Va., forming the York River. (See U. S. Coast and Geodetic Survey
Chart No. 504.)
   Existing project.-This provides for securing a channel 7 feet deep
at mean low water and 100 feet wide between Bassett Ferry and the
mouth of the river, a distance of 50 miles. The plane of reference
is mean low water. The tidal ranges are: Mean, 2.9 feet at West
Point, 4 feet at Newcastle Ferry; extreme, 3.5 feet at West Point,
5 feet at Newcastle Ferry; irregular, 6 feet at West Point, 7.5 feet
at Newcastle Ferry. The estimate of cost for new work made in
1875 was $17,508. The estimated cost was modified in 1908 to $55,000
to cover increased depth and width of channel below Bassett Ferry.
The latest (1926) approved estimate for annual cost of maintenance
is $4,000.
   The existing project was adopted by the River and Harbor Act
of June 14, 1880. (Annual Report for 1875, pt. II, p. 162.) The
project was modified in 1885 and 1908, partly by increasing the
depth and width of channel below Bassett Ferry and partly by omit-
ting the portion of the river above Bassett Ferry. The latest pub-
lished map is in the Annual Report for 1890, page 1074.
   Terminal facilities.-There are no wharves existing in the im-
proved section. Six shore landings are located along the banks
where deep water is available. They appear to be adequate for
the requirements of present and prospective commerce. In the deep
portion of the waterway below the section under improvement there
exist 20 wharves or landings.
   1Exclusive     of available funds.
310       REPORT OF         CHIEF OF ENGINEERS,                        U.     S.     ARMY,       1934


  Operations and results during fiscal year.-The U. S. derrick boat
Atlas was engaged from August 7 to September 12, 1933, in removing
a total of 623 snags and 873 overhanging trees from channels and
banks between Whitehouse and Bassett Ferry, a distance of 17 miles.
  The total costs and expenditures for the year were $5,379.73, all
applied to maintenance.
  Condition at end of fiscal year.--The existing project was com-
pleted in 1913, at a saving of about $15,000 under the estimated cost.
Channels aggregating 1.6 miles were dredged. Longitudinal sheet-
pile dikes, aggregating 1,478 linear feet, and permeable spur dikes,
aggregating 2,332 linear feet, have been built. The dikes are in good
condition. The controlling depth in August 1933 was 7.3 feet at
mean low water, except at the extreme upper end of the project. The
cost and expenditures were $31,376.44 for new work and $93,230.62
for maintenance, a total of $124,607.06.
  Proposed operations.-The balance unexpended July 1, 1934,
$1,017.91, will be applied to maintenance contingencies as may be
necessary.
   The sum of $10,000 can be profitably expended during the fiscal
year 1936 in redredging the channels by contract during May and
June 1936.
                                   Cost and financial swmmary
Cost of new work to June 30, 1934___---                                                                       376. 44
                                                                                                        $-----------------------31,
Cost of maintenance to June 30, 194___________________________                                           93, 230. 62

        Total cost of permanent work to June 30, 1934 -----------                                      124, 607. 06

Net total expenditures___________---_        -      -                                                  124, 607. 06
Unexpended balance June 30, 1934_____________----------------                                            1, 017. 91

        Total amount appropriated to June 30, 1934__________--                                          125, 624. 97

       Fiscal year ending June 30              1930             1931               1932         1933            1934

Cost of new work----------         ----------------                                                           ---
Cost of maintenance ------------------- $1, 215. 60           $9, 157. 82          $742. 45   $1,329. 13       $5, 379. 73
Total expended__-----------------------       4, 417. 81      9, 212. 80            742.45     1, 329. 13.      5, 379. 73

Allotted_---___6_.            --
                          ______      ___   -11, 998.39    --------    ----    2, 300. 31       -35. 30         6, 362. 07


Balance unexpended July 1, 1933-------------------------------                                                      35. 57
Amount allotted from War Department Appropriation Act approved
  Mar. 4, 1933_------------------------------                                                                6, 500. 00

      Amount to be accounted for__----___---_                                                                 , 535. 57
                                                                                                             6-------------------
Deductions on account of revocation of impounded funds                                -----------               137. 93

      Net amount to be accounted for_________________----------                                              6, 397. 64
Gross amount expended_____ __-__--__        ___               ------                                         5, 379. 73

        Balance unexpended June 30, 1934__--------------__                                                   1, 017. 91

Amount that can be profitably expended in fiscal year ending June
                                                             - - -- -
30, 1936, for maintenance __    _______                              10, 000. 00

  1 Exclusive   of available funds.
              RIVERS AND HARBORS-WASHTINGTON,                                  D. C., DISTRICT                     311
   11. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                  (GENERAL)

  The cost of work during the year amounted to $28,971.07; the
expenditures were $30,249.12. The balance unexpended June 30,
1934, together with allotment made during June 1934, will be applied
as needed during the fiscal year 1935 to payment of expenses incurred
in connection with the above items. The additional sum of $35,000
can be profitably expended during the fiscal year ending June 30,
1936.
                                        Cost and financial summary
Cost of maintenance to June 30, 1934-----------------------                                             $232, 547. 71
Minus accounts payable June 30, 1934                                                                        , 693.41
                                                                                                           1-------------------------
      Net total expenditures ------------------------------ 230, 854. 30
Unexpended balance June 30, 1934---------------------------  36, 915. 70
          Total amount appropriated to June 30, 1934-------------- 267, 770. 00

          Fiscal year ending June 30                1930          1931          1932             1933           1934


c ost of new w ork - - - - - --            ------- - - - - -- ............   - - - - - -= - - - -- - - - - -
Cost of maintenance_--          --------           $54, 900. 73 $46, 636. 59 $30, 273.04 $33, 456. 30 $28, 971.07
Total expended-----------------------             53 945. 68    51, 741.06    30, 824. 36     31, 349. 66      30, 249.12
Allotted------ ----------------------             48, 700. 00   46, 000.00     5, 500. 00     28, 330. 00      62, 950. 00


Balance unexpended                July 1, 1933                               _________-------------         $4, 214. 82
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1924-------------------------_ $35, 000. 00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933------------------------ 29, 000. 00
                                                                                                            64, 000. 00
     Amount to be accounted for___------    --------------------                                            68, 214. 82
Deductions on account of revocation of impounded funds                                                       1, 050. 00
                                                                                                             1.._.__.
      Net amount to be accounted for------------------------67,   164. 82
Gross amount expended     ----------------------------------- 30, 249. 12
      Balance unexpended June 30, 1934-------------------------                                             36, 915. 70
Outstanding liabilities June 30, 1934-----------------------------                                           1,873. 41
          Balance available June 30, 1934---------------------------                                        35, 042.29
Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance - -       - -- - -- - -- - -- - -- -- - -- -
                                                                        35,000. 00
   1 Exclusive of available funds.
312           REPORT OF CHIEF OF ENGINEERS,                               U.    S.   ARMY,        1934

                  12. Other projects for which no estimates are submitted

             [Commercial statistics for these projects are given in pt. 2 of report]


                                                           For last      Cost and expenditures to        Estimated
                                                          full report          June 30, 1934              amount
                     Name of project                          see                                    -required       to
                                                           annual re-complete
                                                           port for-   New work          Maintenance             plete

1.Anacostia River, D. C. 12..........                  _     1932        $770,100. 19 $129, 066. 28      Completed
2. Aquia Creek, Va.1'_                                       1928         52, 464. 84      11, 750. 00   Completed
3. Monroe Bay and Creek, Va.------------------               1932         12,460. 07                     Completed
4. Upper Machodoc Creek, Va.'-- -- ._-               _       1916         20, 281. 28       6, 118. 72   Completed
5. Breton Bay, Md_--------------------------                 1910         47, 923. 55       5, 576. 45         $7,500
6. Nomini Creek, Va. ...                                     1928
                                           _-------------------------     78, 446. 21      30, 841. 62   Completed
7. Smith Creek, Md. .___-------------------------            1932          5, 252. 22 --------           Completed
8. Patuxent River, Md.1 3______                              1905         14, 000. 00 ------------             $6,000
9.St. Jerome    Creek, Md.----------------------
                         4-      --                          1890          26, 500. 00           -                $26,000
10.   Cockrells Creek, Va.                                   1932
                                                             193   --
                                                                   .................                          $59,000
11.   Dymers Creek, Va.      ------------------------        1912       5, 581. 99   3,418. 01           Completed
12.   Mulberry Creek, Va.l ---------------------             1929       2, 392. 60      107. 40          Completed
13.   Locklies Creek, Va._-------- ---                       1928      11, 581.22      518. 78           Completed
14.                    4 4--
      Carters Creek, Va.1                                    1932      28, 397. 55   1, 190. 93                $8,050
15.   Horn Harbor, Va. 5          --------                   1932-------- ------------                         $6,000

  1 Channels adequate for commerce.
  2 Made a part of the park system of District of Columbia and designated "'Anacostia Park."
  3Abandonment recommended in 1903.
  4Awaiting local cooperation.
  5 Modification of project is recommended in Rivers and Harbors Committee Doc. No. 22, 73d Cong.,
2d sess.

Status of reports called for by river and harbor acts and committee resolutions

                                                          Transmitted           Document no.             Recommen-
          Locality                  Authorization act      to Congress          Document no.             Recomen-
                                                                                                           dation

Breton Bay, Md-.......   Rivers and Harbors---------------------
                           Committee resolu-
                           tion, Jan. 29, 1934.
Coan River, Va .__..-    Rivers and Harbors ..........
                           Committee resolu-
                           tion, May 10, 1934.
Horn Harbor, Va . _ _ Rivers and Harbors Nov. 2,1933 Rivers and Harbors                                  Favorable.
                           Committee resolu-                      Committee, 22, 73d
                           tion, Apr. 29, 1933.                   Cong., 2d sess.
Jackson Creek, Va..... Rivers and Harbors Apr. 27,1934 Rivers and Harbors                                    Do.
                           Committee resolu-                      Committee, 41, 73d
                           tion, Apr. 13, 1933.                   Cong., 2d sess.
Mattaponi River, Va      Rivers and Harbors June 15,1934 Rivers and Harbors                                  Do.
                           Committee resolu-                      Committee, 47, 73d
                           tion, Mar. 30, 1933.                   Cong., 2d sess.
Mattox Creek, Va...... Rivers and Harbors .---------------------
                           Committee resolu-
                           tion, May 10, 1934.
Mill Creek, Va., and Rivers and Harbors ..------           -------------------------
  channel to Rappahan-     Committee resolu-
  nock River.              tion, Jan. 5, 1934.
Mulberry Creek, Va_.... Rivers and Harbors .
                           Committee resolu-
                           tion, Feb. 13, 1934.
Potomac and Anacostia Rivers and Harbors .
  Rivers.                  Committee resolu-
                           tion, June 16, 1934.
Wicomico (Little) River, Rivers and Harbors--
  Northumberland           Committee resolu-
  County, Va.              tion, Jan. 5, 1934.
York River, Va., chan- _....do....
  nel connecting with
  Back Creek to Slaights
  Wharf.
             RIVERS    AND HARBORS-NORFOLK,              VA.,   DISTRICT           313
IMPROVEMENT OF RIVERS AND HARBORS                                         IN THE
            NORFOLK, VA., DISTRICT
    This district includes the watersheds tributary to Chesapeake Bay,
from and including Poquoson River, Va., on the west shore, south-
erly and easterly to the Atlantic Ocean at Cape Henry, Va., the
watersheds tributary to the Atlantic Ocean from Cape Henry, Va.,
to and including Oregon Inlet, N. C.; and also that portion of the
intracoastal waterway between Norfolk, Va., and Beaufort Inlet,
N. C., north of the New Holland, Higginsport & Mount Vernon
Railroad crossing in Hyde County, N. C.
    District engineer: Maj. G. R. Young, Corps of Engineers. Divi-
sion engineer: Col. T. H. Jackson, Corps of Engineers, to June 28,
1934, and Col. Earl I. Brown, Corps of Engineers, since that date.

                                     IMPROVEMENTS

                                      Page                                         Page
1. Norfolk Harbor, Va--------          313   10. Blackwater River, Va      -----   340
2. Thimble Shoal Channel, Va_          318   11. Knobbs Creek, N. C---...          342
3. Channel to Newport News,                  12. Meherrin River, N. C------        343
     Va --- ______       _             320   13. Roanoke River, N. C_-...          344
4. James River, Va    ----------       321   14. Scuppernong River, N. C___        346
5. Appomattox River, Va-.....          328   15. Manteo (Shallowbag) Bay,
,6.Pagan River, Va    ----------       330         N. C_ _______________--         348
7. Waterway from Norfolk, Va.,               16. Mackay Creek, N. C _..._          350
     to the sounds of North                  17. Examinations, surveys, and
     Carolina ________________         331          contingencies   (general)__    351
8. Inland waterway from Nor-                 18. Other projects for which no
     folk, Va., to Beaufort In-                    estimates are submitted'__      352
     let,N. C------------------        334
9. Operating and care of the
     inland waterway from Nor-
     folk, Va., to Beaufort Inlet,
     N. C---------------------         339

                 NORFOLK HARBOR AND CHANNELS, VA.

  This improvement is divided into three subheads: (1) Norfolk
Harbor, (2) Thimble Shoal Channel in the southern end of Chesa-
peake Bay, and (3) the channel leading to Newport News from
Hampton Roads.

                          1. NORFOLK HARBOR, VA.

    Location.-Norfolk, Va., is 187 miles south of Baltimore, Md., and
.30 miles from the entrance to Chesapeake Bay at Cape Charles and
Cape Henry. The harbor extends between the 40-foot contour in
Hampton Roads and the Norfolk & Western Railway bridge over
the Southern Branch of Elizabeth River, a distance of 15.56 miles.
  (See U. S. Coast and Geodetic Survey Charts Nos. 400 and 452.)
    Previous projects.-Adopted by acts of August 14, 1876; July 5,
1884; June 30, 1885; September 19, 1890; June 3,1896; July 7, 1898;
June 13, 1902; March 3,1905; and March 2, 1907. The total cost
and expenditure was $2,633,743.54, of which $2,561,704.27 was for
new work and $72,039.27 was for maintenance. For further details
:see page 1795 of Annual Report for 1915.
314    REPORT   OF   CHIEF OF   ENGINEERS,   U.   S.   ARMY,   1934


   Existing project.-This provides for a main channel 40 feet deep
at mean low water, 750 feet wide from Hampton Roads to the mouth
of the Southern Branch of Elizabeth River, and 450 feet wide up
this branch to the Belt Line Railroad bridge, a total distance of 11.88
miles, and dredged areas in front of the navy yard, on either side of
the 40-foot channel, immediately downstream from the Belt Line
Railroad bridge, 35 feet deep for a width varying from 600 feet to
800 feet:; thence 30 feet deep, 375 feet wide, and 1.05 miles long to
the Virginian Railway bridge; and thence 25 feet deep, and gener-
ally 200 feet wide, and 2.63 miles long to the Norfolk & Western
Railway bridge, making a total distance of 15.56 miles; a channel
in the Eastern Branch, 25 feet deep at mean low water, 500 feet wide,
and 1.09 miles long, from the 40-foot channel at the mouth to the
Norfolk & Western Railway bridge, including within its limits for
a distance of about 1,000 feet above the mouth, a channel 30 feet deep
and 300 feet wide to a point opposite the terminal of the Imperial
Tobacco Co., in Berkley; thence 25 feet deep, 200 feet wide, and 1.75
miles long to the Virginian Railway bridge; a channel in the Western
Branch, between the 40-foot channel at the mouth and a point about
3,000 feet above the West Norfolk Highway Bridge, a distance of
about 1.72 miles, 24 feet deep at mean low water, 300 feet wide, 0.78
mile, and 200 feet wide, 0.37 mile to the bridge; thence 18 feet deep,
150 feet wide, 0.57 mile; a channel in Scotts Creek between the
40-foot channel at the mouth and a point 100 feet above the Atlantic
Coast Line Railroad bridge (about 0.73 mile upstream), 12 feet deep
at mean low water and 100 feet wide; and an anchorage area on the
west side of the 40-foot channel opposite Lambert Point and south
of Craney Island of about 66 acres, 30 feet deep at mean low water,
and another of 45 acres, 12 feet deep, near Pinner Point.
   The mean tidal range is 2.7 feet and the extreme 3 feet. The
extremes of irregular fluctuations, due to combined effect of tides and
wind, referred to mean low water, are -2 feet and +9.62 feet.
   The estimate of cost for new work, revised in 1929, exclusive of
amounts expended on previous projects, is $6,457,700. The latest
 (1928) approved estimate for annual cost of maintenance is $76,500.
   The existing project was authorized by the following river and
harbor acts: The act of July 5, 1884, provided for the improvement
of the Eastern Branch (Annual Report for 1885, p. 1015); the act
of March 2, 1907, provided for a 30-foot channel to the navy yard,
a 22-foot and a 25-foot channel in the Eastern Branch, and the
removal of shoals at the mouth of the Eastern Branch (H. Does.
Nos. 373 and 381, 59th Cong., 1st sess.); the act of June 25, 1910,
provided for a 35-foot channel to the navy yard, 22-foot and 25-foot
channels in the Southern Branch, and a 30-foot anchorage area at
Lambert Point (H. Doc. No. 551, 61st Cong., 2d sess.); the act of
March 4, 1913, provided for a 24-foot channel in the Western Branch
from the mouth to the West Norfolk Highway Bridge (H. Doc. No.
566, 62d Cong., 2d sess.); the act of August 8, 1917, provided for a
40-foot channel to the navy yard, a 35-foot anchorage opposite
Lambert Point, and a 12-foot anchorage near Pinner Point (H. Doc.
No. 605, 63d Cong., 2d sess., and H. Doc. No. 140, 65th Cong., 1st
sess.); the act of March 3, 1925, provided for a 30-foot depth in the
Southern Branch to the Virginian Railway bridge and a 25-foot
          RIVERS AND HARBORS-NORFOLK,         VA.,   DISTRICT     315
depth to the Norfolk & Western Railway bridge, and a 25-foot depth
in the Eastern Branch from the Norfolk & Western Railway bridge
to the Virginian Railway bridge (H. Doc. No. 226, 68th Cong., 1st
sess.); and the act of July 3, 1930, provided for a 30-foot depth in
the Eastern Branch opposite the terminal of the Imperial Tobacco
Co. (H. Doc. No. 37, 71st Cong., 1st sess.), an 18-foot channel in the
Western Branch above the West Norfolk Highway Bridge (H. Doc.
No. 265, 70th Cong., 1st sess.), a 12-foot channel in Scotts Creek
 (H. Doc. No. 189, 70th Cong., 1st sess.), and a 30-foot anchorage on
the west side of the 40-foot channel opposite Lambert Point and
elimination of the 35-foot anchorage area (H. Doc. No. 143, 70th
Cong., 1st sess.). The latest published maps are printed in the fol-
lowing documents: Norfolk Harbor, House Document No. 605, Sixty-
third Congress, second session. Southern and Eastern Branches
Elizabeth River, House Documents Nos. 226, Sixty-eighth Congress,
first session, and 182, Seventy-third Congress, second session. An-
chorage basin vicinity Craney Island, House Document No. 143,
Scotts Creek, House Document No. 189, and Western Branch Eliza-
beth River, House Document No. 265, Seventieth Congress, first
session.
    Recommended' modifications of project. Under date of September
30, 1933, the Chief of Engineers recommended further improvement
of the Southern Branch of the Elizabeth River, Norfolk Harbor,
Va., so as to provide for an extension of the 25-foot channel with
a minimum width of 200 feet to a point 2,500 feet above the Norfolk
& Western Railway bridge, with a turning basin 500 feet square at
a suitable location approved by the Chief of Engineers, at an es-
timated cost of $100,000 with $5,000 annually for maintenance; sub-
ject to certain conditions of local cooperation. (H. Doc. No. 182, 73d
Cong., 2d sess.)
    Local cooperation.-The River and Harbor Act of July 3, 1930,
in adopting the project for a channel in the Eastern Branch, 30 feet
deep and 300 feet wide, extending from the 40-foot channel to a point
opposite the terminal of the Imperial Tobacco Co., imposed the con-
dition that local interests should give assurance satisfactory to the
Secretary of War and the Chief of Engineers that they will provide
and maintain, without cost to the United States, a branch channel of
equal depth to the tobacco terminal. This condition has not yet
been complied with.
    All other conditions of local cooperation have been fully complied
with.
    Terminal facilities.-The terminal facilities within the limits of
this improvement include about 227 wharves, piers, etc., with an
aggregate length available for wharfage purposes of about 32 miles.
It is considered that the facilities are adequate for the present com-
merce of the port. For further details see page 465, Annual Report
for 1932.
    Operations and results during fiscal year.-Maintenance dredging
under contract in the Southern Branch of Elizabeth River between
the Virginian and Norfolk & Western Railway bridges, for the res-
  toration of project dimensions, was commenced on June 5, 1934, and
continued to the end of the fiscal year, when the contract was about
35 percent completed. The work done was the removal of 98451
316     REPORT OF   CHIEF OF ENGINEERS,     U.   S.   ARMY,   1934


cubic yards of material and the restoration of 5,800 feet of channel.
The material removed was deposited ashore on areas provided by
local interests without cost to the United States. The cost of the
work was $19,342.88.
    Miscellaneous maintenance and surveys made during the year cost
 $36,631.23. The total cost was $55,974.11, all of which was for main-
tenance. The total expenditure was minus $254,368.64.
    Condition at end of fiscal year.-The existing project was about
99.9 percent completed at the end of the fiscal year, as follows: The
40-foot channel between Hampton Roads and the Belt Line Railroad
bridge over the Southern Branch, at the southern end of the United
States navy yard, was completed.
    Opposite the navy yard, areas outside of the 40-foot channel,
aggregating about 14 acres, were dredged to a depth of 35 feet, mak-
ing the total available width for this depth 600 to 800 feet for about
3,000 feet below the Belt Line Railroad bridge.
    The above work was performed between 1918 and 1931, inclusive.
    The channel in the Southern Branch between the Belt Line Rail-
road bridge and the Norfolk & Western Railway bridge was com-
pleted in 1928 and 1929.
    The channel in the Eastern Branch between the 40-foot channel
at the mouth and the Norfolk & Western Railway bridge was com-
pleted in 1910, and the channel between the Norfolk & Western Rail-
way bridge and the Virginian Railway bridge was completed in
1928.
   The channel in Scotts Creek was completed in 1931.
   The channel in the Western Branch between the 40-foot channel
at the mouth and the West Norfolk highway bridge was completed in
1914, and between the West Norfolk highway bridge and a point
3,000 feet upstream, in 1931.
   The 30-foot anchorage immediately south of Craney Island was
completed in 1931.
   An investigation made during 1929, in connection with providing
a 12-foot anchorage 48 acres in extent near Pinner Point, shows
that the existing depths at this location are sufficient for an anchor-
age of the area required without additional dredging.
   The controlling depths of the above channels at the end of the
fiscal year were as follows: From Hampton Roads to the mouth of
the Eastern Branch, 40 feet deep over a width of 500 feet; thence
to a point 600 feet below the Belt Line; Railway bridge, 40 feet over
a width of 300 feet; thence to the Belt Line bridge, 35.6 feet over a
width of 100 feet; in the Southern Branch between the Belt Line
Railroad bridge and the Virginian Railway bridge, and between the
Virginian Railway bridge and the Norfolk & Western Railway
bridge, 28.5 feet and 22 feet, respectively; in the Eastern Branch
between the 40-foot channel and the Virginian Railway bridge, 21
feet; in Scotts Creek, 10 feet; and in the Western Branch between
the 40-foot channel and a point 3,000 feet above the West Norfolk
highway bridge, 16 feet. This information is based upon surveys
made during 1933 and 1934.
   The work remaining to be done consists of dredging a channel 30
feet deep and 300 feet wide in the Eastern Branch between the
40-foot channel at the mouth and a point opposite the terminal of the
           RIVERS AND HARBORS-NORFOLK,                   VA.,   DISTRICT           317
Imperial Tobacco Co., a distance of about 1,000 feet, involving the
removal of 50,745 cubic yards of material, place measurement.
  The total cost has been $7,747,164.41, of which $6,318,639.32 was
for new work, not including $23,935.71 from contributed funds, and
$1,428,525.09 for maintenance. The total expenditure was $7,731,-
414.45 from United States funds and $23,935.71 from contributed
funds.
  Proposed operations.-The balance unexpended and accounts re-
ceivable at the end of the fiscal year, $239,388.65, will be applied as
follows:
Accounts payable June 30, 1934 ---------------------------           $16, 750. 27
Maintenance :
    Maintenance of the 40-foot channel between Lambert Point and
      the Army Base, with U. S. hopper dredge, 706,000 cubic yards
      January-June 1935_._..            __-------------------....
    Redredging, under an existing contract, the Southern Branch
                                                                     108, 500. 00

      of Elizabeth River between the Virginian and Norfolk and
      Western Railway bridges, 210,549 cubic yards, July-August
      1934 ------       --------------------------------------        31, 500. 00
    Upkeep of grounds and buildings of the Fort Norfolk Reser-
      vation-----------                                               18, 000. 00
    Balance remaining           ------------------------------------  64, 638. 38
      Total for all work        ---------------------------------           239, 388.65
   The additional sum of $225,000 can be profitably expended during
the fiscal year ending June 30, 1936, as follows:
Maintenance :
   Maintenance of the 40-foot channel between the Belt Line
      R. R. bridge across the Southern Branch and Hampton
      Roads with U. S. hopper dredge, 750,000 cubic yards, Novem-
      ber 1935-April 19366      --------------------------------  $150, 000. 00
   Maintenance of the 30-foot channel in the Southern Branch of
      the Elizabeth River between the Belt Line R. R. bridge and
      the Virginian Railway bridge, by contract, 300,000 cubic
      yards, July-December 1935_____________-------------------     75, 000. 00
        Total for all work--------------------------------225, 000. 00

                           Cost and financial summa.ry
Cost of new work to June 30, 1934_______________________                 $8, 880, 343. 59
Cost of maintenance to June 30, 1934 ________  __________                11, 500, 564. 36
      Total cost of permanent work to June 30, 1934         ---------    10, 380, 907. 95
Value of plant, materials, etc., on hand June 30, 1934    ----------      2 -27, 475. 09
      Net total cost to June 30, 1934________________________            10, 353, 432. 86
Plus accounts receivable June 30, 1934 .____________________                  28, 475. 40
      Gross total costs to June 30, 1934_________ ______    10, 381, 908.26
Minus accounts payable June 30, 1934------------------------     16, 750. 27
     Net total expenditures----------------------------10, 365, 157. 99
Unexpended balance June 30, 1934___________________ ___    210, 913. 25
       Total amount appropriated to June 30, 1934-----------             10, 576, 071. 24
  1Reduced by net rental of dredge Chinook, $145,769.64.
  2 Value of plant (which was included in cost to this Department) included in cost.
318          REPORT          OF     CHIEF       OF       ENGINEERS,           U.     S.    ARMY,              1934



    Fiscal year ending June 30               1930              1931             1932                1933                 1934

Cost of new work...-.....           ...   $691, 614. 38 $1, 081, 182. 12      $16, 116. 31 ................
                    ....
Cost of maintenance---          -   _      145, 877. 63      31, 989. 36      248, 462. 25      $199, 439. 78          $55, 974. 11

       Total cost--.---------------       837, 492. 01    1, 113, 171.48      264, 578. 56       199, 439. 78           55, 974. 11

Total expended .......---------------     685, 037. 17    1, 345, 611. 63     66, 973. 81        133, 133. 84        -254, 368. 64

Allotted_ _____-_---------                 90, 000. 00      902, 400.00     -135, 700. 00       -34, 116. 83           -94, 299. 70


Balance unexpended July 1, 1933                       ____                                                       $50, 844. 31
Amount allotted from War Department Appropria-
  tion Act approved Apr. 26, 1934_             $108, 500. 00
Amount allotted from War Department Appropria-
  tion Act approved Mar. 4, 1933               1298, 392. 07
                                                                                                                 406, 892. 07

     Amount to be accounted for____________                                                                      457, 736. 38
Deductions on account of:
   Revocation of allotment___--___-- __------
                                     --        $487, 752. 79
   Revocation of impounded funds-- ____-- ____-13, 438. 98
                                                                                                                 501, 191. 77

      Net amount to be accounted for______                 ___                                                  -43,     455. 39
Gross amount expended _________-----------$368, 331.95
Less:
    Reimbursements collected_________ $134, 785. 36
    Receipts from sales_______________ 487, 915. 23
                                                    622, 700. 59
                                                                                                               -254,     368. 64

      Balance unexpended June 30, 1934_________________                                                          210, 913. 25
Outstanding liabilities June 30, 1934______________ $19, 934. 91
Amount covered by uncompleted contracts----------    30, 657. 12
                                                                                                                  50, 592. 03

      Balance available June 30, 1934----------------- ---------                                                 160, 321. 22
Accounts receivable June 30, 1934--------------------------                                                       28, 475. 40

         Unobligated balance available June 30, 1934-------------                                                188, 796. 62

Amount (estimated) required to be appropriated for completion
of existing project 2------ ----- _                                                                              11, 200. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1936, for maintenance 2- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -                     225, 000. 00
                               2. THIMBLE SHOAL CHANNEL, VA.
  Location..--Thimble Shoal lies in the channel between Hampton
Roads and the ocean and is 20 miles northeast of the center of Nor-
folk Harbor, extending southeasterly 9 miles from a point 11/4 miles
east of Thimble Shoal Lighthouse toward the entrance to Chesa-
peake Bay. .(See U. S. Coast and Geodetic Survey Chart No. 1222.)
  Previous projects.-Adopted by the act of June 25, 1910. The cost
and expenditures on the original project prior to the commencement
of operations under the existing project were $333,608.88, all of
which was for new work. For further details see page 470, Annual
Report for 1932.
  Existing project.-This provides for dredging a channel 9 miles
long, 750 feet wide, and 40 feet deep at mean low water. Under or-
dinary conditions the mean tidal range is 2.5 feet and the extremes
   1 Includes $218,392.07      account transfer of plant.
   2 Exclusive     of available funds.
                    RIVERS AND HARBORS-NORFOLK,                                     VA., DISTRICT                      319
2 and 3 feet. The extremes of irregular fluctuation, due to combined
wind and tides, referred to mean low water, are -2 feet and +        9.5
feet.
   The estimate of cost for new work revised in 1928 was $2,325,000,
exclusive of amounts expended on previous projects. The latest
 (1928) approved estimate of cost for annual maintenance is $50,000.
   The existing project was adopted by the River and Harbor Act
of August 8, 1917 (H. Doec. No. 140, 65th Cong., 1st sess.). The latest
published map is in House Document No. 551, Sixty-first Congress,
second session.
   Terminal facilities.-For descriptions of the terminal facilities for
these points see this head under " Norfolk Harbor " and " Channel to
Newport News, Va."
    Op'erations and results dwring fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1929 at a saving of $41,227 under the estimated cost. The
controlling depth at the end of the fiscal year was about 39 feet
at mean low water for the full bottom width. The total costs and
expenditures have been $2,568,901.83, of which $2,283,772.56 was for
new work and $285,129.27 for maintenance.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $99.989.29, will be applied to maintenance of the chan-
nel between Hampton Roads and the ocean with Government plant,
October 1934-January 1935.
   The additional sum of $100,000 can be profitably expended during
the fiscal year ending June 30, 1936, in maintenance of the channel
between Hampton Roads and the ocean with Government plant,
July-November 1935.
                                            Cost and financial summary
Cost of new work to June 301, 1934__-----------------------  $2, 617, 381. 44
Cost of maintenance to June 30, 1934------------------------     285, 129. 27

           Total cost of permanent work to June 30, 1934----------                                         2, 902, 510. 71

     Net total expenditures-----------------------------                                                   2, 902, 510. 71
Unexpended balance June 30, 1934---------------------------                                                    99, 989. 29

           Total anount appropriated to June 30, 1934------------                                          3, 002, 500. 00

    Fiscal year ending June 30                  1930            1931              1932              1933            1934


Cost of new work..--------------                        -----------------------------------------------
                   .......
Cost of maintenance-------------              $52, 805. 59    $50, 098. 61     $67, 217. 61       $20,510. 71

Total expended----........------------...      79, 399. 42     50, 840. 33      67, 187. 12        20, 571. 97 --------------

Allotted......----------------------          50, 000. 00     115, 000. 00 -           .....
                                                                               ...-------------    50,000. 00      $70, 500.00


Balance unexpended July 1, 1933----------------------------- $29,489.29
Amount allotted from War Department Appropriation Act ap-
                       ----------------------------
  proved Apr. 26, 1934__                                      70, 500. 00

           Amount to be accounted for---------------------------                                                 99, 989. 29
           Balance unexpended June 30, 1934-------------------                                                   99, 989. 29

Amount that can be profitably expended in fiscal year ending June
   30, 1936, for maintenance 1----                           -----------------------                            100, 000. 00
   1Exclusive of available funds.
       91536-ENG 1934--21
320    REPORT OF CHIEF OF ENGINEERS,        U.   S. ARMY,   1934

                3. CHANNEL TO NEWPORT NEWS, VA.

   Location.-This channel, which is 10 miles west of Norfolk Har-
bor, connects deep water in James River with Hampton Roads. (See
U. S. Coast and Geodetic Survey Chart No. 400.)
   Previous projects.-Adopted June 13, 1902. The cost and expendi-
tures were $237,500, of which $225,000 was for new work and $12,500
for maintenance. For further details see page 1795 of Annual
Report for 1915.
   Existing project.-This provides for dredging a channel 40 feet
deep at mean low water, 600 feet wide, increased to 1,000 feet at the
ends, and 31/4 miles long through the shoal north of Middle Ground
Light. Under ordinary conditions the mean tidal range is 2.7 feet
and the extremes 2.1 and 3 feet. The extremes of irregular fluctua-
tions due to combined wind and, tides, referred to mean low water,
are -2 feet and +9.5 feet.
   The estimate of cost for new work, revised in 1927, was $1,521,515,.
exclusive of amount expended on previous projects. The latest
 (1927) approved estimate for annual cost of maintenance is $20,000.
   The existing project was adopted by the following river and har-
bor acts: The act of June 25, 1910, provided for a channel 400 feet
in width and 315 feet deep at mean low water (H. Doc. No. 550, 61st
Cong., 2d sess.) ; the act of August 8, 1917, provided for the increase
in width to 600 feet (H. Doc. No. 605, 63d Cong., 2d sess.); and the
act of January 21, 1927, provided for the present channel dimensions
 (H. Doc. No. 486, 67th Cong., 4th sess.). The latest published map
is in House Document No. 605, Sixty-third Congress, second session.
   Terminal facilities.-There are four piers at Newport News, which
are the property of the city, and which are open to general public
use on equal terms. All of the other piers and wharves served by this
improvement are owned by private corporations or companies. The
principal terminal and transfer facilities are those of the Chesa-
peake & Ohio Railway Co., and the Newport News Shipbuilding &
Dry Dock Co. There are also at Newport News a wharf used by
steamers of the Eastern Steamship Co. and a small boat harbor.
The terminal facilities are adequate for present commerce.
   Operations and results during fiscal year.-Specifications for
dredging were prepared and advertised. No bids were received. The
cost and expenditure was $19.25 for maintenance.
  Condition    at end of fiscal year.-The existing project was com-
pleted in 1931. The controlling depth at the last examination,
November, 1932, was 40 feet at mean low water over a width of 400
feet. The total costs and expenditures have been $1,352,019.25, of
which $1,252,261.99 was for new work and $99,757.26 for main-
tenance.
   Proposed operaitions.-The balance unexpended at the end of the
fiscal year, $19,980.75, will be applied to maintenance of the channel,
by contract, during September 1934.
   It is believed that no additional funds can be profitably expended
during the fiscal year. ending June 30, 1936, as it is <expected that
the work contemplated will provide for the needs of navigation
until a later date.
                    RIVER'S AND HARBORS-NORFOLK,                                            VA.,   DISTRICT               321
                                              Cost and financial summary
Cost of new work to June 30, 1934___     ---------           $1, 477, 261. 99
Cost of maintenance to June 30, 1934-------------------------    112, 257. 26
           Total cost of permanent work to June 30, 1934                                                       , 589, 519. 25
                                                                                                              1----------

Net total expenditures  -------------------------------                                                       1, 589, 519. 25
Unexpended balance June 30, 1934---------------------------                                                       19, 980. 75
           Total amount appropriated to June 30, 1934-------------1                                           1, 609, 500. 00

    Fiscal year ending June 30                   1930                1931              1932            1933             1934


Cost of new work -------------                $222, 732. 26       $162,118.78 ------------........................
Cost of maintenance-------------------.-.--                   _        ----- _$3,          324.99 ---------------          $19.25
Total expended.--            .------------     200, 632. 29        121, 223.33        82, 896.81         $89. 21               19. 25
Allotted.....------------------------                              25, 000. 00-----------                               20, 000.00


Amount allotted from War Department Appropriation Act approved
  July 14, 1932      ------------------------------------------           $20, 000. 00
Gross amount expended--------------------------                 -----------     19. 25
           Balance unexpended June 30, 1934----------------------                                                    19, 980. 75
                                               4. JAMES RIVER, VA.

   Location.-This river is formed by the junction of the Cowpasture
and Jackson Rivers, in Botetourt County, Va., flows easterly 340
miles, and empties into Hampton Roads at Newport News, Va. (See
U. S. Coast and Geodetic Survey Charts Nos. 529, 530, and 531.)
   Previous projects.--Adopted by the act of July 11, 1870. The
cost and expenditures were $763,000, including $23,000 appropriated
in 1836 and 1852. There is no record showing how much of the
amount was expended for new work and maintenance. For further
details see page 1797 of Annual Report for 1915.
   Existing project.--This provides for a channel 25 feet deep and
300 feet wide from the mouth to Hopewell, 69.2 miles; thence 25 feet
deep and 200 feet wide, following the cut-off route between Hope-
well and the Richmond deep-water terminal, 17.8 miles; and a chan-
nel 18 feet deep and 200 feet wide from the deep-water terminal to
the Richmond Lock gates, 3.8 miles.
   Depths of channels are referred to mean low water. The total
length of channel included in the project is 90.8 miles.
   The mean tidal ranges under ordinary conditions for different
parts of the river are as follows: Mouth, 2.5 feet; Jamestown, 1.85
feet; City Point, 2.8 feet; Dutch Gap, 3.5 feet; Richmond, 3.9 feet.
Following are the extreme ranges under ordinary conditions at the
same localities: Mouth, 2.1 to 3 feet; Jamestown, 1.6 to 2.3 feet;
City Point, 2.3 to 3.2 feet; Dutch Gap, 2.9 to 3.9 feet; Richmond, 3.2
to 4.2 feet. The ordinary fluctuations of stage at Richmond due to
floods are 6 to 12 feet above mean low water. The extreme fluctua-
tions are 16 to 32 feet. The flood heights below Richmond diminish
rapidly, the extreme, according to available information, being about
11 feet lower at Dutch Gap, 14 miles below, and 17 to 18 feet lower
20 miles below.
322    REPORT OF CHIEF OF ENGINEERS,        U.   S.   ARMY,   1934

   The estimate of cost for new work, revised in 1930, exclusive of the
amount expended on previous projects, is $7,630,000. The latest
 (1930) approved estimate of cost for annual maintenance is $100,000.
   The existing project was authorized by the following river and
harbor acts: The act of July 5, 1884, provided for the excavation
of a channel 22 feet deep at mean low water from the mouth to
Richmond and the construction of spur and training dikes (S. Doc.
No. 147, 47th Cong., 1st sess.) ; the act of June 13, 1902, provided for
extending the improvement to the head of navigation at the Rich-
mond Lock gates (H. Doc. No. 234, 56th Cong., 1st sess.) ; the act of
March 3, 1905, provided for forming a turning basin by widening
the channel at Richmond (H. Doc. No. 234, 56th Cong., 1st sess.);
the act of July 3, 1930 (H. Doc. No. 314, 71st Cong., 2d sess.), pro-
vided for the present dimensions of the project. For the latest pub-
lished map of the river see the last-mentioned document.
   Local cooperation.-The River and Harbor Act of July 3, 1930,
in adopting the modified project imposed the condition that local
interests shall furnish all necessary rights-of-way and spoil-disposal
areas and give assurances satisfactory to the Secretary of War and
the Chief of Engineers that they will provide adequate terminal fa-
cilities and will hold and save the United States free of any and all
claims for damages resulting from the cut-offs across Turkey Island,
Jones Neck, Dutch Gap, and Aiken Swamp, and will provide such
connections as might be necessary for transportation between the sec-
tions of land divided by these cut-offs, and that they will provide,
when necessary, turning basins in the vicinity of the Richmond
terminal and in the vicinity of Hopewell. Under date of January
17, 1931, the city council of Hopewell, by resolution, furnished the
necessary assurance that when the necessity therefor had been de-
termined by the War Department necessary terminal facilities and
turning basin would be provided in the vicinity of Hopewell, at
such locations and in accordance with such plans as had the approval
of the Secretary of War. By ordinance approved March 17, 1932,
the council of the city of Richmond bound itself to perform the dif-
ferent items of cooperation imposed by Congress in the act of July
3, 1930, for the improvement of the waterway between Hopewell and
Richmond, and authorized the expenditure of such funds as may be
necessary to defray the cost of such cooperation.
   Terminal facilities.-The river's commerce at Richmond is handled
at the city-owned terminals City Wharf and Richmond Dock, and
at 14 privately owned wharves located within or in the immediate
vicinity of Richmond Harbor. Below Richmond the improvement
is served by 42 wharves. The Richmond terminals and wharves
together with the wharves between Richmond and the river's mouth
are adequate for the river's commerce. For further details see page
477, Annual Report for 1932.

             OPERATIONS AND RESULTS DURING FISCAL YEAR

   Regular funds.-Newl work dredging under contract for the con-
struction of a cut-off channel at Aiken Swamp and Dutch Gap,
which was in progress at the end of the last fiscal year, was con-
tinued to November 8, 1933, when the contract was completed. The
          RIVERS AND HARBORS-NORFOLK,         VA.,   DISTRICT      323
work accomplished was the removal of 724,760 cubic yards of ma-
terial, place measurement, and the excavation of 4,196 feet of chan-
nel to project dimensions. The cost of the work was $109,668.51.
   Maintenance dredging under contract in Richmond Harbor was be-
gun October 23, 1933, and completed January 16, 1934. The work
accomplished was the removal of 62,473 cubic yards of material,
place measurement, and the restoration of 1,748 feet of channel to
depths varying from 12 feet to 18 feet over bottom widths varying
from 45 feet to 200 feet. The cost of the work was $15,126.40.
   Maintenance dredging under contract for the restoration of about
1,900 feet of channel in the vicinity of Drewry Bluff to a depth of
18 feet over a bottom width of 200 feet, and widening at a bend,
was begun January 23, 1934, and the contract completed February
2, 1934. The work accomplished was the removal of 72,856 cubic
yards of material. The cost of the work was $12,449.04.
   The material removed in the above dredging operations was de-
posited ashore on areas provided by the city of Richmond without
cost to the United States.
   Maintenance dredging with U. S. dredge Talcott, operated by hired
labor, for the restoration of the project depth of 25 feet over a
bottom width of 300 feet in the channels between the mouth and
Hopewell, was begun February 1, 1934, and 54.87 percent completed
at the end of the fiscal year. A total of 1,654,907 cubic yards of ma-
terial was removed, resulting in the restoration of 11,050 feet of chan-
nel to project depth over the full bottom width, and 43,855 feet of
channel to project depth over one-half the full bottom width. The
material removed was deposited in adjacent waters at a minimum
distance of 1,000 feet from the channel axis. The cost of the work
was $99,118.64.
    Miscellaneous surveys, inspections, and river flow studies were
made during the year at a cost of $5,621.82, all of which was for
maintenance.
    The total cost of the work accomplished with regular funds was
 $241,984.41, of which $109,668.51 was for new work and $132,315.90
was for maintenance. The total expenditure was $107,227.93.
    Funds allotted by Federal Emergency Administration of Public
Works.-New work dredging under contract, for the construction of
a cut-off channel across Turkey Island to a depth of 25 feet over a
bottom width of 200 feet, was commenced on December 22, 1933, and
continued to the end of the fiscal year, which the contract was 88
percent completed. The work accomplished was the removal of
2,083,788 cubic yards of material, place measurement, and the exca-
vation of 3,725 feet of channel to project depth over the full bottom
width, 2,850 feet of channel to depths varying from 16 feet to 25
feet over the full bottom width and 450 feet of channel to depths of
18 feet over one-half the full bottom width. The material removed
was deposited on areas provided by local interests without cost to
the United States. The cost of the work was $493,985.58.
    The total cost of the work accomplished with public works funds
was $518,334.31, all of which was for new work. The total expendi-
ture was $436,224.24.
    Condition at end of fiscal year.-The project was about 72 percent
completed at the end of the fiscal year at a cost of $4,301,553.51 from
regular funds and $518,334.31 from public works funds.
324     REPORT     OF CHIEF OF ENGINEERS,          U.   S. ARMY,   1934

   The work performed with regular funds consisted of dredging on
10 shoals between the mouth and Hopewell and on 3 shoals between
Hopewell and Drewry Bluff; dredging a cut-off channel across
Aiken Swamp and Dutch Gap; dredging and rock excavation be-
tween Drewry Bluff and Richmond; and constructing regulation
works between Hopewell and Richmond.
   The result of this work was a channel between the mouth and
Hopewell having the project dimensions of 25 feet deep and 300
feet wide; a channel between Hopewell and Dutch Gap, a distance
of about 18.5 miles, having a depth of 18 feet over bottom widths
varying from 120 to 300 feet; a cut-off channel across Aiken Swamp
and Dutch Gap, a distance of about 1.6 miles, 25 feet deep over a
bottom width of 200 feet; and a channel between Aiken Swamp and
Richmond, a distance of about 12 miles, 18 feet deep over bottom
widths varying from 110 to 200 feet. The regulation works, con-
sisting of dikes and jetties constructed of sheet piling revetted with
riprap, are generally in fair condition, although nearly all of them
require further revetting. The work performed with Public Works
funds consists of the partial completion of a contract for dredging
a cut-off across Turkey Island. The head of navigation is at the
Richmond Lock Gates, and this feature has not been affected by
the improvement. Boat navigation is practicable throughout the
year between Hampton Roads and Richmond. The controlling
depth between the mouth and Hopewell was 23 feet. The controlling
depth between Hopewell and Richmond was 18 feet.
   The work remaining to be done is the removal of about 6,620,000
cubic yards of material for the completion to project dimensions of
about 20 miles of channel between Hopewell and Richmond.
   The total cost, all funds, was $5,502,632.19, of which $4,819,887.82
was for new work and $682,744.37 for maintenance. The total ex-
penditure was $5,411,825.55.
   Proposed operations (regular funds) .- The balance unexpended
and accounts receivable at the end of the fiscal year, $251,398.27, will
be applied as follows:
Accounts payable, June 30, 1934--------------------- ---               $7, 899. 78
New work:
    Funds held to satisfy contractor's claim for refund of liquidated
      damages in connection with dredging Aiken Swamp-Dutch
      Gap cut-off ---------------------------------------------- 16, 411.60
Maintenance :
    Dredging with U. S. Dredge Talcott on 5 shoals between the
      mouth and Hopewell, 1,361,100 cubic yards, July 1934-Febru-
      ary 1935____--------------- -------------------------------     158, 900. 00
    Funds held to satisfy contractor's claim for refund of liquidated
      damages in connection with dredging in Richmond Harbor___             825. 00
    Emergency dredging in Richmond Harbor, by contract, 50,000
      cubic yards --------------------------------------------          10, 000. 00
    Balance remaining ---------------------------------------           57, 361. 89

       Total for all work (regular funds) ---------------------
                                                            _       _   251,398.27
  Proposed operations (Public Works funds) .- The balance un-
expended and accounts receivable at the end of the fiscal year,
$159,766.81, will be applied as follows:
                       RIVERS AND HARBORS-NORFOLK,                                    VA.,       DISTRICT                  325
Accounts payable June 30, 1934--------------------------------                  $83, 101.12
New work :
    Dredging, under an existing contract, cut-off channel at Turkey
      Island, to project dimensions, 290,212 cubic yards, July and
     August, 1934------------------------_____________------___________________
                                                                             --  76, 665. 69

            Total for all work (Public Works Administration funds) _-_                                             159, 766. 81
    The additional sum of $905,000 can be profitably expended during
the fiscal year ending June 30, 1936, as follows:
New work: Dredging a cut-off channel at Jones Neck, by contract,
  2,600,000 cubic yards, July 1935-March, 1936-------------------_  _ $705, 000
Maintenance :
    Restoring project dimensions in channels below Hopewell, by
       contract, 500,000 cubic yards, January-April, 1936------------- 100, 000
    Restoring project dimensions in cut-off channels, and securing
       a channel 18 feet deep between the proposed Richmond deep-
       water terminal and Richmond, by contract, 450,000 cubic yards,
       July-October, 1935_        ---------------------------_          90, 000
     Emergency dredging in Richmond Harbor, by contract, 50,000
       cubic yards------------- ----------------------------------- 10, 000

                Total for all work---                           __--                                                   9-------------------------
                                                                                                                       905, 000

                                                Cost and ftnancial summary

                                       MAINTENANOd AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934---____--------------------    $5, 064, 553. 51
Cost of maintenance to June 30, 1934___------------------------     682, 744. 37
      Total cost of permanent work to June 30, 1934                                        ----------        5, 747, 297. 88
Value of plant, materials, etc., on hand June 30, 1934                                     ----------           -- 1, 167. 58
      Net total cost to June 30, 1934_________________________                                               5, 746, 130. 30
Plus accounts receivable June 30, 1934________________________                                                       370. 79
     Gross total costs to June 30, 1934______________________                                                5, 746, 501. 09
Minus accounts payable June 30, 1934-------------------------                                                     7, 899. 78
      Net total expenditures_________________________-                                                       5, 738, 601. 31
Unexpended balance June 30, 1934_____________                                                                   251, 027. 48

            Total amount appropriated to June 30, 1934 ___________                                           5, 989, 628. 79

    Fiscal year ending June 30                     1930            1931             1932             1933               1934

Cost of new work-------------..............$305, 757. 48        $582, 078. 00    $252, 204. 21    $281, 477. 36       $109, 668. 51
Cost of maintenance------------.........       3, 245. 77        123, 193. 86      22, 755. 16      22, 389.42         132, 315. 90
        Total cost-----------------              309, 003. 25    705, 271. 86     274, 959. 37     303, 866. 78        241, 984. 41
Total expended----........--....---------....    347, 342.44     626, 121. 73     371, 177. 49     430, 081. 17        107, 227. 93
Allotted.----------------------                  146, 400. 00    567, 000.00      294, 500. 00     462, 068. 95        166, 159. 84


Balance unexpended July 1, 1933------      ___       ____ -
                                                __------                                                          $192, 095. 57
Amount allotted from War Department Appropria-
  tion Act approved Apr. 26, 1934 _____________     $37, 400. 00
Amount allotted from War Department Appropria-
  tion Act approved July 14, 1932                  250, 000. 00
Amount allotted from War Department Appropria-
  tion Act approved Mar. 4, 1933.----. --------   - 50, 000. 00
                                                                                                                   337, 400. 00
            Amount to be accounted for-----                                     ____--------.                      529,495. 57
326          REPORT          OF CHIEF OF ENGINEERS, U. S. ARMY,                                                      1934

Deductions :
    Revocation of allotment_-----------------1 $170, 717. 24
   Revocation of impounded funds ---------------     522. 92
                                                                                                                      $171, 240.16

       Net amount to be accounted for------------------------                                                          358, 255. 41
Gross amount expended___ ------                     278, 701. 70
Less :
    Reimbursements collected---------- $6,631. 97
    Receipts from sales--------------- 164, 841. 80
                                                    171, 473.77
                                                                                                                       107, 227.93

      Balance unexpended June 30, 1934---------------------251, 027. 48
Outstanding liabilities June 30, 1934 11111--------------    17, 473. 63

      Balance available June 30, 1934_______________----------                                                         233, 553. 85
Accounts receivable June 30, 1934----------------------------                                                               370. 79

          Unobligated balance available June 30, 1934_                                       -___-___                  233, 924. 64

Amount (estimated) required to be appropriated for completion
                     "
of existing project ---- _______    ___                      1, 700, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1936:
   For new work__ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -                          705, 000. 00
   For maintenance 2_______________________________________                                                            200, 000. 00
                    -- - - - - -   --      -- - -- - - -- -- - -- - - -- - -- -- - - -- -- - -- - -
          Total                                                                                                        905,000. 00

                                              PUBLIO WORKS FUNDS

Cost of new work to June 30, 1934_______- -                                                  -        _,---            518, 334. 31
Cost of maintenance to June 30, 1934_____________

Total cost of permanent work to June 30, 1934 -------    __------518, 334. 31
Plus accounts receivable June 30, 1934--------------------------      991. 05

     Gross total costs to June 30, 1934_____________
                                         --                                                             ____            519, 325. 36
Minus accounts payable June 30, 1934_______________-                                                                     8',101. 12

          Net total expenditures__________________---
                                                -_                                                                     436, 224. 24
Unexpended balance June 30, 1934__-- --                                         __----------------                      158, 775. 76

          Total amount appropriated to June 30, 1934 -------------- 595, 000. 00


    Fiscal year ending June 30                 1930                 1931                  1932                1933            1934


Cost of new work-----              _-----------------            ----------------------------------                         $518, 334. 31
Cost of maintenance-..-...----                 --------------                  -----------------------------------
Total expended------........---------                 ------------------------------------------                             436, 224. 24

Allotted-----------........................-------------------------------------.............--------------                     000.
                                                                                                                             595,  00


Amount allotted from National Industrial Recovery Act approved
  June 16, 1933-----------------------------------            -- $595, 000. 00
Gross amount expended _________--------_____       $438, 737. 64
Less reimbursements collected--------------------     2, 513. 40
                                                                  436, 224. 24
Balance unexpended June 30, 1934___ --------------                                                                      158, 775. 76
   1 Includes $164,841.80, account transfer of plant.
   2 Exclusive of available funds.
                      RIVERS AND HARBORS-NORFOLK,                                          VA., DISTRICT                      327
Outstanding liabilities June 30, 1934--------------                                             $83, 112. 02
Amount covered by uncompleted contracts----------                                                76, 654. 79
                                                                                                                 $159, 766. 81

Balance available June 30, 1934---------------------------                                                              -- 991. 05
Accounts receivable June 30, 1934------------------------------                                                            991.05

             CONSOLIDATED COST AND FINANCIAL SUMMARY FOR JAMES RIVER, VA.

Cost of new work to June 30, 1934-------------       ------   $5, 582, 887. 82
Cost of maintenance to June 30, 19346------------------------      82, 744. 37

Total cost of permanent work to June 30, 1934---------------      6,265, 632. 19
Value of plant, materials, etc., on hand June 30, 1934-----------   -1, 167. 58

      Net total cost to June 30, 1934--- ------------------ 6, 264, 464. 61
Plus accounts receivable June 30, 1934-----------                1, 361. 84

      Gross total costs to June 30, 1934--------------------6, 265, 826. 45
Minus accounts payable June 30, 1934------------------------    91, 000. 90
     Net total expenditures                                   174, 825. 55
                                                           6-----------------------------,
Unexpended balance June 30, 1934--------------------------409, 803. 24
           Total amount appropriated to June 30, 1934-,-----------                                               6,584, 628 .79

    Fiscal year ending June 30                           1930            1931            1932            1933              1934


Cost of new work_-------__                    -       $305, 757. 48   $582, 078. 00   $252, 204. 21   $281, 477. 36      $628, 002. 82
Cost of maintenance---...-..-.                           3, 245. 77    123, 193. 86     22, 755. 16     22, 389. 42       132, 315. 90
        Total cost..........---------------            309, 003. 25   705, 271. 86     274, 959. 37    303, 866.78        760, 318. 72
Total expended        ----------------
                       ....                            347, 342. 44    626, 121. 73    371, 177. 49    430, 081. 17       543, 452. 17
Allotted------...........    --     __            _    146, 400. 00    567, 000. 00    294, 500. 00    462, 068. 95       761, 159. 84



Balance unexpended July 1, 1933---------------------------                                                            $192, 095. 57
Amount allotted from War Department Appropria-
tion Act approved April 26, 1934---------------$37, 400. 00
Amount allotted from War Department Appropria-
tion Act approved July 14, 1932--------------250, 000. 00
Amount allotted from War Department Appropria-
tion Act approved Mar. 4, 1933-----------------50, 000.00
Amount allotted from National Industrial Recovery
Act approved June 16, 1933------------------- 595, 000. 00
                                                                                                                       932, 400. 00

      Amount to be accounted for-------1------------------,                                                            124, 495. 57
Deductions on account of:
   Revocation of allotment-------------------1170, 717. 24
   Revocation of impounded funds--------------        522. 92
                                                                                                                       171, 240. 16

        Net amount to be accounted for------------------------                                                         953, 255. 41
Gross amount expended ----    ------------------- 717, 439.34
Less :
     Reimbursements collected---------$9, 145. 37
     Receipts from sales-----------1--   64, 841. 80
                                                     173, 987. 17
                                                                                                                       543, 452. 17

             Balance unexpended June 30, 1934--------------------                                                      409, 803. 24
    1 Includes       $164,841.80 account transfer of plant
328         REPORT OF            CHIEF OF ENGINEERS,                        U.       S. ARMY,     1934

Outstanding liabilities June 30, 1934-------------- $100, 585. 65
Amount covered by uncompleted contracts ---------     76, 654. 79
                                                                                                        $177, 240. 44
      Balance available June 30, 1934_____                         _-___-________-                       232, 562. 80
Accounts receivable June 30, 1934________-
                                 ......                                       ____.__..-_                  1, 361. 84
         Unobligated balance available June 30, 1934_ _________---233, 924.64

Amount (estimated) required to be appropriated for completion
of existing projects 1---------------------_                                                          1, 700, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1936:
   For new work-__________                            - - - - - - - - - - - - - - - - - -- - - - - -
                    - - - - - - - - - - - - - - - - -___________                                         705, 000. 00
        minteance - .______.
   For For
       maintenance                         _______             _______                                         0.0 00
                                                                                                         20 000.
                                                                                                         200,

         Total                ------------------------------------------------                           905, 000. 00


                                  5. APPOMATTOX RIVER, VA.

   Location.-This river rises in Appomattox County, Va., flows
northeasterly 137 miles, and empties into the James River at Hope-
well, Va. The portion under improvement extends from its mouth
to Petersburg, Va., a distance of 11 miles, which is the length of the
tidal reach. (See U. S. Coast and Geodetic Survey Chart No. 531.)
   Previous projects.-None. Prior to the adoption of a project,
the sum of $22,500, appropriated in 1852, was expended in making
a survey of the river.
   Existing project.-This provides for a navigable channel 80 feet
wide and 10 feet deep at mean low water between the mouth of the
river and Petersburg, the head of navigation, a distance of 11 miles,
and a turning basin at Petersburg; for a dam at Petersburg and the
excavation for a width of from 200 to 300 feet of a diversion chan-
nel connecting the river above the dam at Petersburg with the river
at a point 21/2 miles below; for about 1.7 miles of levees on the low
grounds between the navigable and diversion channels; for a high-
way bridge and a railway bridge across the diversion channel; and
for other work incidental to the diversion channel. Under ordinary
conditions the mean tidal range is 2.9 feet and the extremes 2.4 and
3.3 feet. There are no records available of the heights of stage due
to ordinary floods. These are estimated at 6 to 8 feet above mean low
water at Petersburg, where the extremes are from 15.6 to 17.1 feet.
   The estimated cost of the navigable channel, revised in 1927, was
$578,136 for new work, and the estimated cost (1909) of the diver-
sion channel and work incident to its construction was $260,000. The
estimated cost of maintenance (1927) of the navigable channel is
$6,500 annually.
   The existing project was authorized by the following river and
harbor acts: The acts of June 13, 1902, and March 3, 1909, pro-
vided for work pertaining to the diversion scheme (H. Doc. No. 139,
56th Cong., 2d sess.) ; the act of March 3, 1871, provided for a navi-
gable channel 60 feet wide and 12 feet deep at mean high water.
 (A. R. 1874, pt. II, p. 54) the act of June 25, 1910, provided for in-
  1Exclusive of available funds.
           RIVERS AND HARBORS--NORFOLK,            VA.,   DISTRICT        329
creasing the width of the navigable channel to 80 feet and for the
maintenance of the diversion works at Petersburg (H. Doc. No. 952,
60th Cong., 1st sess.) ; and the act of January 21, 1927, provided for
increasing the depth from 12 feet at mean high water to 10 feet at
mean low water, an increase of 1/2 feet (H. Doc. No. 215, 69th Cong.,
1st sess.). The latest published map is in House Document No. 952,
Sixtieth Congress, first session.
   Local cooperation.-Fully complied with.
   Terminal facilities.-All wharves and terminals served by the Ap-
pomattox are situated on the river front at Petersburg. The wharves
constitute a continuous timber bulkhead on piling and having an
aggregate length of about 2,313 feet. The terminal facilities are con-
sidered adequate for the present river commerce.
   Operations and results during fiscal year.-Maintenance dredging
under contract for the removal of shoals at the mouths of Lieutenant
Run and Pye Alley was performed between August 16 and 31, 1933.
The cost of the work was $6,119.47.
   Work on a survey of the Diversion Channel, in connection with
proposed maintenance dredging, was commenced on April 2, 1934,
and continued to the end of the fiscal year when the work was about
90 percent completed. The cost of the work was $3,565.07.
   The totial cost was $9,684.54, all of which was for maintenance.
The total expenditure was $9,170.71.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1931. The navigable channel, between the mouth and Point
of Rocks, a distance of about 3.5 miles, has natural depths ranging
from 10 to 30 feet at mean low water over widths in excess of the
required width of 80 feet. Dredging operations for the attainment
of a depth of 12 feet at mean high water (corresponding to a depth
of 8.5 feet at mean low water) over a bottom width of 80 feet in the
navigable channel between Point of Rocks and Petersburg was com-
pleted in 1912. Deepening this channel to the project depth of 10
feet at mean low water was accomplished between September 1929
and January 1931. The diversion channel and the works incidental
thereto were completed in 1921.
   The controlling depth in June 1934 was about 5 feet at mean low
water, at the mouth of Lieutenant Run at Petersburg. The head
of navigation is Petersburg. Navigation is practicable throughout
the year. The total cost has been $1,077,562, of which $830,151 was
for the new work and $247,411 was for maintenance. The total ex-
penditure was $1,077,157.71, of which $782,157.71 was applied to the
navigable channel and $295,000 was applied to the diversion channel.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $5,674.66, will be applied as follows:
Accounts payable June 30, 1934------------------------                $404. 29
Maintenance:
    Dredging by contract between the head of navigation and Lieu-
      tenant Run at Petersburg, 14,600 cubic yards, August 1934 .-.  4, 770. 37
    Completion of survey of diversion channel, July and August 1934_    500. 00

      Total for all work-------      ---------------------------- 5, 674. 66
  Maintenance dredging is required annually for the removal of
material carried down by freshets and deposited in both the navigable
and diversion channels. The additional sum of $36,000 can be
330            REPORT OF CHIEF OF ENGINEERS,                                  U. S. ARMY,                           1934

profitably expended during the fiscal year ending June 30, 1936,
to be applied to maintenance of the existing channels, by contract,
between the mouth and Petersburg during the period July-October,
1935.
                                      Cost and financial summary
Cost of new work to June 30, 1934-------------------------- $852, 651. 00
Cost of maintenance to June 30, 1934------------------------247, 411. 00
      Total cost of permanent work to June 30, 1934     1, 100, 062. 00                ----------
Minus accounts payable June 30, 1934___    _______________404. 29

     Net total expenditures    ---------------------------1, 099, 657. 71
Unexpended balance June 30, 1934---------------------------    5, 674. 66
           Total amount appropriated to June 30, 1934 __________                                                     1, 105, 332. 37


   Fiscal year ending June 30              1930              1931                 1932                       1933            1934


Cost of new work--------------         $63, 642. 73       $17, 001. 68    ............................
Cost of maintenance--------..... .------- _----                385. 39           $4, 652. 54             $3, 978. 40         $9, 684. 54
        Total cost                  _
                            ---- -------
                       _-------          ---                17, 387. 07      ___ -              -        -       -     _      9, 684. 54
Total expended-----------------           50, 860. 70      23, 029. 57            6, 901. 64                 4, 524. 51       9, 170. 71
Allotted .--         ----      .....---------------------..---------------        2, 299. 24             -2, 021. 68          8, 954. 99



Balance unexpended July 1, 1933______________---------__ $5, 890.38
Amount allotted from War Department Appropriation Act approved
  Mar. 4, 1933    -------------------------------------------- 9, 000. 00
     Amount to be accounted for_______________________________ 14, 890.38
Deductions on account of revocation of impounded funds----------    45. 01

      Net amount to be accounted for--------------------                                                               -__14, 845. 37
Gross amount expended_9______-_____-          ___-____                                                                     9, 170. 71
Balance unexpended June 30, 1934____ _____  ___-- -____  ___ 5, 674. 66
Amount covered by uncompleted contracts_--------------___---    413. 04

           Balance available June 30, 1934____________________________                                                     5, 261. 62

Amount that can be profitably expended in fiscal year ending June
                                  - -- - -- - -- - -- - -- - -- - -- -
30, 1936, for maintenance                                             36, 000. 00
                                         6. PAGAN RIVER, VA.

  Location.--This river, a tidal stream, rises in Isle of Wight County,
Va., flows northeast 10 miles, and empties into James River. (See
U. S. Coast and Geodetic Survey Chart No. 529.)
  Previous projects.-Adopted by the acts of June 14, 1880, and
March 3, 1905. The cost and expenditures were $20,671.01 for new
work. For further details see page 1798 of Annual Report for 1915.
  Ecisting project.-This provides for a channel having a least width
of 80 feet and a depth of 10 feet at mean low water between the
wharf of the Smithfield, Newport News & Norfolk Steamship Co.
(formerly the Old Dominion Steamship Co.) at Smithfield, and the
10-foot contour in James River, a distance of about 62/3 miles. Under
ordinary conditions the mean tidal range is 2.6 feet. No data for
extreme ranges of tides are available.
   1
       Exclusive of available funds.
                  RIVERS AND HIARBORS-NORFOLK,                                               VA.,    DISTRICT                 331
   The estimate of cost for new work, revised in 1920, exclusive of
amount expended on previous projects, was $54,600. The latest
(1928) approved estimate for annual cost of maintenance is $3,000.
   The existing project was authorized by the following river and
harbor acts: The act of June 25, 1910, provided for widening the
channel at certain bends or angles (H. Doc. No. 397, 60th Cong., 1st
sess.), and the act of March 2, 1919, provided for the present dimen-
sions of the project (H. Doc. No. 591, 64th Cong., 1st sess.). The
latest published map is in the last-mentioned document.
   Terminal facilities.-There are 16 wharves or landings on this
river, of which 14 are at Smithfield, Va., and 2 at Battery Park,
about 1 mile above the river's mouth. The length of dockage avail-
able at Smithfield is about 1,100 feet. At Battery Park the length
of dockage is about 85 feet. The facilities are considered adequate
for present and prospective requirements.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1923 at a saving of $23,846 under the estimated cost. The
controlling depth at the last examination, October 1933, was 6.6 feet
at mean low water. The head of navigation is at Cofer Landing,
9 miles above the mouth. Navigation is practicable throughout the
year.
   The total cost and expenditures have been $100,199.59, of which
$30,754.48 was for new work and $69,445.11 was for maintenance.
   Proposed operations.-No funds are available and no operations
are proposed during the fiscal year 1935.
   The additional sum of $5,000 can be profitably expended during
the fiscal year ending June 30, 1936, and will be applied to main-
tenance dredging, by contract, during April 1936.
                                            Cost and financial summary

Cost of new work to June 30, 1934 ___________________________-                                                        $51, 425. 49
Cost of maintenance to June 30, 1934 ________________________                                                          69, 445. 11
      Total cost of permanent work to June 30, 1934_______________ 120, 870. 60
Net total expenditures ----------------------------------------    120, 870. 60
Total amount appropriated to June 30, 1934_____________________ 120, 870. 60

    Fiscal year ending June 30                     1930                1931                 1932         1933               1934

Cost of new work ...........                I...     ..     ....       ..     ...     ...    ..
Cost of maintenance --                    ___-----------------------____....          $22, 381. 65     $13, 531. 97 1------        -.
Total expended----                  __...   ___---------------     -----------          10, 665.44      25, 248. 18   -_______-
Allotted..........---------------------        -$3, 014.03           $37, 000. 00----.-1,                  06. 38


Amount that can be profitably expended in fiscal year ending June 30,
1936, for maintenance___--    __-       ______-      ______    ____ $5, 000
7. WATERWAY                   FROM NORFOLK, VA., TO THE SOUNDS                                                   OF NORTH
                                                            CAROLINA

  Location.-This water route extends south from Norfolk, Va., to
Pamlico Sound, N. C. (See U. S. Coast and Geodetic Survey Charts
Nos. 1227, 1228, 1229, and 1231.) For description see page 492,
Annual Report for 1932.
332    REPORT   OF CHIEF   OF ENGINEERS,   U.   S. ARMY,   1934


    Existing project.--This provides for dredging the following chan-
nels: Deep Creek, Va., 3 miles long; Turners Cut, N. C., 4.4 miles
long; through a shoal in the Pasquotank River, N. C., near Ship
Yard Bar, and through a bar in Croatan Sound near Croatan Light-
house. A least bottom width of 80 feet and a depth of 10 feet at
mean low water are the project dimensions of all the channels named.
The limiting width of 80 feet applies to Turners Cut; the channels
in Deep Creek and Pasquotank River have been dredged the project
depths for widths of 100 feet, while the channel in Croatan Sound
has been dredged to a width of 200 feet and a depth of 12 feet. The
project also included the cutting of points at sharp bends in the
Pasquotank River and the protection of banks in Turners Cut with
sheet piling. In Deep Creek and the Southern Branch of the Eliza-
beth River the mean tidal range under ordinary conditions is about
3 feet and the extremes 2.3 and 3.2 feet. The extremes of irregular
fluctuation in these two streams due to combined effect of tides and
wind, referred to mean low water, are about -2 feet and + 9.62 feet.
The remaining sections of the waterway are nontidal and not subject
to flood. There are at times, however, variations of 1 to 2 feet in
level, due to wind. The estimate of cost for new work, made in
1899, was $274,310. The latest (1928) approved estimate of cost for
annual maintenance is $5,000.
    The existing project was adopted by the River and Harbor Act
approved March 3, 1899 (H. Doc. No. 317, 54the Cong., 1st sess., and
Annual Report for 1896, p. 1086; and H. Doc. No. 131, 55th Cong.,
3d sess., and Annual Report for 1899, p. 1485). The latest published
map is found in House Document No. 391, Sixty-second Congress,
second session.
    Terminal facilities.-The northern end of this waterway is in
Norfolk Harbor, Va., the terminal facilities of which are described
under this heading in the report on that improvement. There are
three small wharves on the Dismal Swamp Canal. There are three
landings along the Pasquotank River, between the south end of the
canal and Elizabeth City. At Elizabeth City, N. C., there are 18
wharves. Below Elizabeth City there are two wharves on the east
bank of the Pasquotank River. The facilities are considered ade-
quate for existing commerce. For further details see page 493,
Annual Report for 1932.
     Operations and resuts during fiscal year.-None. Inspections of
the waterway were made during the year at a cost of $193.55, charged
to maintenance. The total expenditure was $134.82.
     Condition at end of fiscal year.-The project was completed in
1903 at a saving of $23,114 under the estimated cost. The controlling
depth at the end of the fiscal year was about 8 feet, this depth oc-
curring in Deep Creek and Turners Cut. Navigation is practicable
throughout the year.
     The total cost has been $550,993.93, of which $251,196.46 was for
new work and $299,797.47 was for maintenance. The total expend-
iture was $550,870.
     Proposed operations.-The balance unexpended at the end of the
  fiscal year, $47,999.56, will be applied as follows:
                     RIVERS AND EHARBORS-NORFOLK,                                            VA., DISTRICT                         333
Accounts payable June 30, 1934-____     _______________________       $123.93
Maintenance :
    Dredging Deep Creek, Va., and Upper Turners Cut, N. C., by
      contract, 214,000 cubic yards, July-October 1934---------_ 37, 10O0.00
    Dredging Dismal Swamp Canal at the month of the Feeder
      Ditch and in the Feeder Ditch, by contract, 11,250 cubic
      yards, October 1934--    ----------------------------- ____ 4, 200.00
   Dredging, snagging, and bank trimming in Dismal Swamp Canal,
     Va., with U. S. derrick barge No. 14, July-August 1934-------- 2, 700. 00
   Dredging, snagging, and bank trimming in Turners Cut and
     Pasquotank River, N. C., with U. S. derrick barge No. 14,
     May-June 1935--------------------------------------            3, 875. 63

           Total for all work----------------------------------                                                             47,999.56
   The additional sum of $10,000 can be profitably expended during
the fiscal year ending June 30, 1936, and will be applied to main-
tenance dredging, snagging, and bank trimming in Dismal Swamp
'Canal, Turners Cut, and Pasquotank River, with U. S. derrick
barge No. 14 during July-November 1935.
                        Cost and financial summnary
rCost of new work to June 30, 1934--   ----------------------                                                          $251, 196. 46
Cost of maintenance to June 30, 1934___------------------__                                                            299, 797. 47
     Total cost of permanent work to June 30, 1934----------550,                                                                993. 93
Minus accounts payable June 30, 1934_________-----------------                                                                  123. 93

      Net total expenditures__ ____-----------------                                                                     550, 870. 00
Unexpended balance June 30, 1934_ ____ __111
                                           __ _1 1147,                                                                        999. 56
           Total amount appropriated to June 30, 1934 ----                                             ____-_ 598, 869°. 56

           Fiscal year ending June 30                             1930          1931            1932            1933             1934


Cost of new work.-------------------------.---------
Cost of maintenance.....------------------- $1, 759. 35 $6, 327. 19                          $12, 358. 71     $8, 930. 38         $193. 55

Total expended--------------------------52. 17                                 6, 428. 33     14, 278. 85      8, 865. 18           134. 82

Allotted.....................-----------------------------       5, 000. 00   14, 000. 00 ------------ 10, 000. 00              46, 999. 56


Balance unexpended July 1, 1933__-----------------------          $1, 134.8-4
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934______---------------      $5, 000. 00
Amount allotted from War Department Appropriation
Act approved July 14, 1932-----------------------    43,000.00
Amount allotted from War Department Appropriation Act
  approved Mar. 4, 1933---------------------------     5, 000.00
                                                                  53, 000.00
      Amount               to be accounted for--      ---------------                                  --------- 54, 134.82
;Deductions on             account of-
    Revocation              of allotment_--___   __----                                                     6, 000. 00
    Revocation              of impounded funds_                                                                    .44
                                                                                                                             6, 000. 44

       Net amount to be accounted for----_ ------ ____-___                                                                  48, 134.38
-Gross amount expended-------------------------------------                                                                     134.82

       Balance unexpended June 30, 1934__     ---------------                                                               47, 999. 56
Outstanding liabilities June 30, 1934____------------------------                                                              123. 93
       Balance available June 30, 1934                                                                                          875. 63
                                                                                                                            4----------------------7,
Amount that can be profitably expended in fiscal year ending June
    30, 1936, for maintenance 1--                            -            ----------------                                  10, 000. 00
    1ExClusive of available funds.
334          REPORT OF CHIEF OF ENGINEERS,                                    U.     S.   ARMY,      1934

         8. INLAND WATERWAY FROM NORFOLK, VA., TO BEAUFORT
                            INLET, N. C.

  Location.-The improvement described consists of a sea-level in-
land water route approximately paralleling the Atlantic coast be-
tween Norfolk, Va., and Beaufort Inlet, N. C., a distance of 197.91
statute miles; and a lock canal, known as the " Dismal Swamp
Canal ", 25 statute miles in length. For description of the waterway
see pages 495-497, Annual Report for 1932. (See U. S. Coast and
Geodetic Survey Charts Nos. 1227, 1228, 1231, and 1233.)
  Previous projects.,_Partialprojects were adopted by acts of March
3, 1873, March 3, 1879, June 18, 1878, June 14, 1880, March 3,
1881, and September 19, 1890. The total cost and expenditures were
$292,095.65 for new work and $52,804.35 for maintenance, a total
of $344,900. For further details see page 497, Annual Report for
1932.
  Existing project.-This provides for an inland waterway with a
depth of 12 feet at mean low water between Norfolk, Va., and Beau-
fort Inlet, N. C., a distance of 197.91 miles, with bottom widths vary-
ing from 90 feet in land cuts to 300 feet in open waters, for the con-
struction of a.tidal guard lock in the Albemarle and Chesapeake
Canal at or near Great Bridge, Va., for the construction, operation,
and maintenance of a suitable bridge across the waterway near
Fairfield, N. C., for the purchase of the Lake Drummond (Dismal
Swamp) Canal as an adjunct to the inland waterway at a price
of not to exceed $500,000, and for its maintenance to a depth of
about 9 feet over a bottom width of 50 feet. The length of the
Dismal Swamp Canal is 25 miles, making the total length of water-
ways under improvement 222.91 miles.
   Data relative to the locks included in the project are as follows:

                                      Dimensions          Depth on
                                                          miter sills
                                                                                                                Esti-
Miles                                                                                            Per-   Year mated
from                                        Great-                             Character of      cent- opened    or
Nor-            Location          Width      est                               foundation         age to navi-c
folk,                              of      length        Up        Low                          com-             cost of
Va.                              chamin-   avail- Lift         -         -                      pleted gation    each
                                             able         per        er                                           lock
                                     er     for full
                                            width

                                   Feet      Feet Feet Feet Feet
12. 04   Albemarle and Chesa-         75       600 2. 7 (1)  (1)               Piles in sand       100   1932    $492, 980
          peake Canal (Great                                                       and shells.
          Bridge, Va.).
10. 7    Dismal Swamp Canal           38       250 12       9             9 _do                    100   1900      45, 000
           (Deep Creek, Va.).
33. 1    Dismal Swamp Canal           39       250 12       9             9 ....do-... ..          100   1899      45, 000
          (South Mills, N. C.).

  1 16 feet 1 elevation.


  The waterway is nontidal except in the Southern Branch of Eliza-
beth River and in Beaufort Inlet, N. C. In the Southern Branch
the mean tidal range under ordinary conditions is2.7 feet and the
extremes are 2.3 and 3.2 feet. The extremes of irregular fluctuation,
due to the combined effect of the tide and wind, referred to mean low
water, are -2 and + 9.62 feet. In Beaufort Inlet, N. C., under ordi-
           RIVERS AND HARBORS-NORFOLK,        VA.   DISTRICT      335
nary conditions the mean tidal range is 2.6 feet and the extremes: are
2.3 and 3.2 feet.
   The estimate of cost for new work, revised in 1933, is $7,870,600,
exclusive of amounts expended on previous projects. The latest
(1933) approved estimate for annual cost of maintenance is $90,600.
   The existing project was adopted by the following river and
harbor acts: The act of July 25, 1912, adopted the original route
of the Norfolk-Beaufort Inlet section (H. Doc. No. 391, 62d Cong.,
2d sess.); the act of August 8, 1917, authorized a change of route
in the Albemarle Sound-Pamlico Sound section, via the Alligator
River-Rose Bay route, and the Pamlico Sound-Neuse River section,
via Pamlico Sound-Brant Shoal-Neuse River route, to Alligator
River-Pungo River route, and Goose Creek-Bay River route, re-
spectively (H. Does. Nos. 1478, 63d Cong., 3d sess., and 1136, 64th
Cong., 1st sess., approved by the Secretary of War Apr. 14, 1919);
the act of July 18, 1918, changed the Alligator River-Pungo River
route (a proposed land cut connecting the rivers) from a straight
line, as approved by the first modification, to a bent line approaching
nearer the town of Fairfield, N. C. (approved by the Secretary of
War on May 15, 1919); the act of March 3, 1925, provided for the
purchase of the Lake Drummond Canal (Rivers and Harbors Com-
mittee Doc. No. 5, 67th Cong., 2d sess.) ; the act of March 4, 1933
 (Public, No. 433, 72d Cong.), provided for the construction of a suit-
able bridge near Fairfield, N. C. (Rivers and Harbors Committee Doc.
No. 5, 72d Cong., 1st sess.) ; and the act of July 3, 1930, authorized
the construction of a tidal lock at Great Bridge at a limit of cost of
not to exceed $500,000 (S. Doc. No. 23, 71st Cong., 1st sess.). The
latest published maps are in the last-mentioned document and House
Document No. 1136, Sixty-fourth Congress, first session.
   Local cooperation.-The act of March 4, 1933, in authorizing the
construction of a highway bridge across the waterway near Fair-
field, N. C., imposes the condition that construction shall not be
started until in the opinion of the Secretary of War it is justified
by the needs of land and water traffic, and the Secretary of War and
the Chief of Engineers have received satisfactory assurances that by
the date of completion of the said bridge, the State or other local
interests will provide a suitable, bridge across Northwest Fork and
a suitable road between Swanquarter and Columbia via the Fairfield
Canal route.
   Terminal facilities.-The north end of this waterway is in Norfolk
Harbor, the terminal facilities of which are described in the report
on that improvement. Between Norfolk and Albemarle Sound there
are 13 wharves or landings. Along the route between Albemarle
Sound and Pamlico River are 10 wharves. Located upon waters
tributary to the Pamlico River-Neuse River section are 15 wharves,
aggregating a frontage of about 600 feet. There are eight wharves
on the section of the waterway from Neuse River to Beaufort Inlet,
with a combined frontage of about 400 feet. At Morehead City,
N. C., there are 27 wharves, their total frontage being about 500 feet.
Contiguous to the harbor at Beaufort, N. C., the southern terminus of
the waterway, there are 46 wharves, their total frontage being about
1,200 feet. The facilities are considered adequate for existing com-
merce. For further details see page 499 Annual Report for 1932.
     91536---ENG 1934------22
336     REPORT   OF CHIEF OF ENGINEERS,      U.   S. ARVY,   1934


   Operations and results during fiscal year.-Maintenance dredging
under contract, for the restoration of project dimensions in the
Dismal Swamp Canal, which was in progress at the close of the
last fiscal year, was continued to January 13, 1934, when the work
was completed. The cost of the work was $62,843.32.
   Maintenance snagging in Dismal Swamp Canal with U. S. derrick
barge No. 14, operated by hired labor, was performed between Jan-
uary 9 and June 30, 1934. The cost of the work was $10,381.13.
   Maintenance snagging in Alligator River, between Newport News
Point and the Alligator River-Pungo River land cut, with U. S.
derrick barge No. 14, operated by hired labor, was performed be-
tween April 23 and 26, 1934. The cost of the work was $641.83.
   Maintenance work, under contract, for the construction of tem-
porary detours across the Dismal Swamp Canal at Deep Creek, Va.,
and South Mills, N. C., which was in progress at the close of the
last fiscal year was continued to July 29, 1933, when the work was
completed. The cost of the work was $9,625.63.
   Maintenance work, under contract, for the construction of drive-
ways on barges for use as pontoon draw-spans for temporary de-
tours across Dismal Swamp Canal at Deep Creek, Va., and South
Mills, N. C., which was in progress at the close of the last fiscal year
was continued to July 20, 1933, when the work was completed. The
cost of the work was $3,432.41.
   Maintenance work, under contract, for the construction of concrete
highway approaches to the highway bridge at South Mills, N. C.,
was commenced on May 17, 1934, and continued to June 23, 1934,
when the work was completed. The cost of the work was $3,420.26.
   Maintenance work, under contract, for the removal of the old
highway bridges across Dismal Swamp Canal at Deep Creek, Va.,
and South Mills, N. C., and their replacement with new bridges was
performed between August 21, 1933, and June 19, 1934, when the
work was completed. The cost of the work was $111,759.89.
   Miscellaneous surveys were made during the year at a cost of
$1,640.98.
   Maintenance work, by contract, for the construction of a steel
highway bridge at Wilkerson Creek near Belhaven, N. C., was com-
pleted during the fiscal year. The cost of the work was $63,730.47.
   Maintenance work for the preparation of plans and specifications
for a steel highway bridge to replace the present Core Creek bridge
was done during the fiscal year. The cost of the work was $433.
   Maintenance dredging, by contract, for the restoration of project
dimensions in the Neuse River-Beaufort Harbor section of the water-
way resulted in the removal of 67,082 cubic yards of material. The
cost of the work was $19,897.34.
   The total cost was $287,806.26, of which $203,745.45 pertains to the
Norfolk district, and $84,060.81 to the Wilmington (N. C.) district.
The total expenditure was $197,848.89, of which $126,662.13 was
disbursed by the Norfolk district and $71,186.76 was disbursed by t he
Wilmington (N. C.) district.
   Condition at end of fiscal year.-The Inland Waterway project
was about 99 percent completed at the end of the year. The work
remaining to be done to complete the project is the construction of
           RIVERS AND IIARBORS-NORFOLK,           VA.,   DISTRICT        337
a highway bridge across the Alligator River-Pungo River land cut
section of the waterway near Fairfield, N. C., at an estimated cost
of $90,000.
   The controlling depths of the Norfolk-Beaufort section at the end
of the fiscal year were as follows: Between Norfolk, Va., and the
New Holland, Higginsport & Mount Vernon Railroad bridge in
Hyde County, N. C., 119 miles, 10.9 feet in upper end of North
River; and between the New Holland, Higginsport & Mount Ver-
non Railroad bridge and Beaufort, N. C., 78.91 miles, 10.5 feet, at
a point 1 mile north of Core Creek bridge.
   The Albemarle & Chesapeake Canal was purchased by the United
States from the Chesapeake & Albemarle Canal Co. on April 30,
1913, at a cost of $500,000. The Dismal Swamp Canal was acquired
by the United States March 30, 1929, from the Lake Drummond
Canal & Water Co. for $500,000.
    The controlling depth of the navigable portion of the Dismal
Swamp Canal section, 22.4 miles in length, was 7 feet, this depth
occurring at the mouth of the feeder ditch.
    Navigation is practicable throughout the year on each of the above
sections.
    The total cost has been $9,914,776.78, of which $8,623,213.36 (in-
cluding $1,000,000 for the purchase of the Albemarle & Chesapeake
and the Dismal Swamp Canals) was for new work, and pertains to
the Norfolk district; and $1,291,563.42 was for maintenance, of which
 $1,158,902.61 pertains to the Norfolk <dstrict and $132,660.81 per-
tains to the Wilmington (N. C.) district. The total expenditure
was $9,971,004.99, of which $9,851,218.23 was disbursed by the Nor-
folk district and $119,786.76 was disbursed by the Wilmington
  (N. C.) district.
    Proposed operations.-The balance unexpended and accounts re-
ceivable at the end of the fiscal year, $271,282.85, will be applied as
follows:
Accounts payable June 30, 1934     ----------------------------   $115, 990. 97
Maintenance:
    Funds held to satisfy contractor's claim for refund of liqui-
      dated damages, Dismal Swamp Canal dredging------------         6, 075. 00
    Funds held to satisfy contractor's claim for refund of liqui-
      dated damages, Dismal Swamp bridges, Deep Creek, Va.,
      and South Mills, N. C--------------------------------          2,225. 00
    Dredging in Southen Branch, Currituck Sound, North River,
      and Alligator River, by contract, 700,000 cubic yards, Feb-
      ruary-June 1935------------------------------------           90, 629.99
    Snagging and bank trimming in the waterway between Norfolk
      and New Holland, Higginsport, and Mount Vernon R. R.
      bridge, with U. S. derrick barge No. 14, March-May 1935 ..     5, 000. 00
    Dredging, by contract, in the Neuse River-Beaufort Harbor
      section of the waterway, 171,206 cubic yards of material,
      during July and August 1934, and April and June 1935 ...      51, 361. 89
      Total for all work__ ---------------------------------        271, 282. 85
   The additional sum of $175,000 can be profitably expended during
the fiscal year ending June 30, 1936, as follows:
New work: Construction of highway bridge across the Alligator River-
   Pungo River land cut section of the Inland Waterway at Fairfield,
  N. C., by contract, November 1935-April 1936 -------------------
                                                  __                  $90, 000
338        REPORT OF CHIEF OF ENGINEERS,                                    U. S. ARMY,             1934

Maintenance :
   Dredging channels to project dimensions, in shoal places, between
      Norfolk and the New Holland, Higginsport & Mount Vernon
      R. R. bridge, by contract, 500,000 cubic yards, January-May
      1936      -----------------------------------------------       $50, 000
    Snagging and bank trimming in the waterway between Norfolk and
      the New Holland, Higginsport & Mount Vernon R. R. bridge, with
      U. S. derrick barge No. 14, May-June 1936___________________      5, 000
    Dredging channels to project dimensions, in shoal places, between
      the New Holland, Higginsport & Mount Vernon R. R. bridge and
      Beaufort Inlet, by contract, 300,000 cubic yards, April-June
      1936-- ---------------------------------------------- 30, 000

        Total for all work               -------------------------------------                                175, 000

                                        Cost and financial summary
Cost of new work to June 30, 1934 ----------------------                                            $8, 915, 309. 01
Cost of maintenance to June 30, 1934_  -__     ____-----                                             1, 344, 367. 77
      Total cost of permanent work to June 30, 1934                            ----------           10, 259, 676. 78
Value of plant, materials, etc., on hand June 30, 1934 __-___-                                       2 -28,  148. 81
      Net total cost to June 30, 1934-.----...                          ---...-. --                 10, 231, 527. 97
Plus accounts receivable June 301, 1934_                                            __---_
                                                                               -____-__                      367. 99
     Gross total costs to June 30, 1934 ___ -- _____--___                                           10, 231, 895. 96
Minus accounts payable June 30, 1934____         -__- -___-,                                            115, 990. 97

     Net total expenditures                                                      __-__--
                                                                                     -   lo_______________--
                                                                                         10, 115, 904. 99
Unexpended balance June 30, 1934_____---- ---------...                                                    270, 914. 86
        Total amount appropriated to June 30, 1934_-___                                   ___-      10, 386, 819. 85

   Fiscal year ending June 30               1930           1931              1932            1933              1934


Cost of new work______ __-          _    $164, 546. 37   $45, 062. 25     $515, 993. 48    $19, 452. 25
Cost of maintenance ------      _         223, 564. 67   214, 774. 63       80, 318. 08     92, 203. 70     $287, 806. 26

      Total cost---------------          388, 111. 04    259, 836. 88      596, 311. 56    111, 655. 95       287, 806. 26

Total expended----------------           476, 012. 54    110, 280. 93      626, 361. 67    142, 973. 26       197, 848. 89

             _ ---------- -----
Allotted ------                           50, 000. 00    325, 789. 63      377, 400. 00    161, 931. 96       365, 490. 04



Balance unexpended July 1, 1933_                    __               $103, 273. 71
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934--__-----------------       $227,700.00
Amount allotted from War Department Appropriation
                             .
Act approved July 14, 1932___       ______------       105, 500.00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933__--__----    __---------     218, 500. 00
                                                                      551, 700. 00

     Amount to be accounted for __--__-----     ___-----------654, 973. 71
                         Revocation of allotment___ 185, 257. 54
Deductions on account of Revocation of impounded
                                          funds                                             52. 42
                                                                                           9--------------------
                                                                                                          186, 209. 96

        Net amount to be accounted for____________-__-------                                              468, 763. 75
Gross amount expended_________----_____---_                                           383, 217. 63

   1Increased by $33,433.54, debit on plant rental account of Currituck charged to past
work.
  2 Minus balance due to value of plant acquired without cost, which has been charged
into cost of work.
                RIVERS AND IIARBORS-ISNORFOLK,                                   VA.,      DISTRICT                    339
Less-
        Reimbursements collected----------    $111. 20
        Receipts from sales--------------- 185, 257. 54
                                                                                      $185, 368. 74
                                                                                                           $197, 848. 89


-Outstanding
     Balance unexpended June 30, 1934_------------------------
           liabilities June 30, 1934--------------- 124. 456. 57
Amount covered by uncompleted contracts               5, 126. 93
                                                                                                            270, 914. 86

                                                                                                            129, 583. 50

      Balance available June 30, 1934-------------------------- 141, 331. 36
Accounts receivable June 30, 1934-------------------------------     367. 99

        Unobligated balance available June 30, 1934------                                                   141, 699. 35

Amount that can be profitably expended in fiscal year ending June
30, 1936 :
                   -  - -    - -    -   -  - -- -
    For new work 1____            ___________        ___ -    -
                                                                                                              90, 000. 00
    For maintenance 1_________________________ -      _____   ___                                             85, 000. 00

        Total 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 175, 000. 00

  9. OPERATING AND CARE OF THE INLAND WATERWAY                                                                  FROM
            NORFOLK, VA., TO BEAUFORT INLET, N. C.

   The improvement for which report is made under this caption
forms a part of the project for the " Inland Waterway from Nor-
folk, Va., to Beaufort Inlet, N. C." (See pp. 334 to 339, where
general information can be found.)
   The Government owns and operates 5 highway bridges and 1
railroad bridge with draw spans, 1 guard lock, and operates 1 ferry
for handling highway traffic on the Norfolk-Beaufort Inlet portion
of the Inland Waterway, and owns and operates 2 locks and 2
bridges with draw spans on the Dismal Swamp Canal portion. The
portion of the Dismal Swamp Canal between Gilmerton and Deep
Creek, which is abandoned for navigation purposes, is crossed by
one Government-owned fixed bridge.
   Operations and results during fiscal year.-The structures were
operated and maintained in a satisfactory condition. The total cost
was $172,829.34, of which $161,887.75 pertains to the Norfolk district,
and $10,941.59 to the Wilmington (N. C.) district. The total ex-
penditure was $172,535.48, of which $161,512.53 was disbursed by the
Norfolk district and $11,022.95 by the Wilmington (N. C.) district.
   Condition at end of fiscal year.-For controlling depths and con-
dition of channel see page 337.
   The total cost of operation and maintenance at the end of the fiscal
year was $1,171,871.64, of which $1,075,567.34 pertains to the Norfolk
district and $96,304.30 to the Wilmington (N. C.) district. The total
expenditure was $1,164,646.02, of which $1,068,578 was disbursed
by the Norfolk district and $96,068.02 by the Wilmington (N. C.)
district.
   Proposed operations.-The bridges, lock, buildings, and plant per-
taining to the operation of the waterway will be operated and main-
  1 Exclusive of available funds.
340       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                            19 34

tained under allotments from appropriations made available for such
purposes.
                                   Cost and financial sinmmary

Cost of maintenance to June 30, 1934_______________------                                      $1,171, 871.64
Plus accounts receivable June 30', 1934_________________--                                             258. 60

      Gross total costs to June 30, 1934_.___.________--                                        1,172, 130. 24
Minus accounts payable June 30, 1934__________________----                                          7,484. 22

     Net total expenditures_                                                                   1, 164, 646. 02
                                                                                           _________-_-________-__
Unexpended balance June 30, 1934                   ___                                               30, 847. 11
        Total amount appropriated to June 30, 1934--------                                        195,493. 13
                                                                                                 1,

   Fiscal year ending June 30         1930               1931          1932             1933             1934


Cost ofnew work ..........
Cost of maintenance------------_    $78, 039. 39    $128, 492. 53   $143, 376. 95    $179, 459. 23     $172,829.34

Total expended----------------       75, 034. 15     130, 911. 48    140, 980. 23     179, 005. 72      172, 535. 48
Allotted----------------------       84, 000. 00     111, 100. 00    179, 700. 00     163, 828. 38      173, 728. 70



Balance unexpended July 1, 1933__    _____$29,                         53. 89
Amount allotted from permanent indefinite appropriation, sec. 6,
  River and Harbor Act, Mar. 3, 1909_--------------------        181, 000. 00
     Amount to be accounted for .__- -____---------------       210, 653. 89
Deductions on account of revocation of impounded funds---------   7, 271.30

      Net amount to be accounted for------- ----------       203, 382. 59
Gross amount expended__________ ____________$173,    066. 77
Less reimbursements collected____----      __--   _  531, 29
                                                             172, 535. 48
      Balance unexpended June 30, 1934------__   - ________--                                        30, 847. 11
Outstanding liabilities June 30, 1934____ _____     -    11, 640. 47
Amount covered by uncompleted contracts-       - -    -10,   798. 74
                                                                                                     22, 439.21

      Balance available June 30, 1934__ ---     __----------------                                     8, 407. 90
Accounts receivable June 30, 1934 _____ ___________---
                                          --         -258.                                                     60

     Unobligated balance available June 30, 1934________-----                                         8,666. 50
Amount allotted for fiscal year 1935_____-------------                                               81, 000. 00

        Balance available for fiscal year 1935_                       ___           _____-__--89, 666.50

                                10. BLACKWATER RIVER, VA.

  Location.-This river, a nontidal stream, rises in Prince George
County, near Petersburg, Va., and flows in a general southeasterly
direction for 80 miles, where it unites with the Nottoway River to
form the Chowan River, which empties into Albemarle Sound. The
portion under improvement extends from its mouth to Franklin, Va.,
a distance of 13 miles. (See U. S. Geological Survey, Holland quad-
rangle, Virginia.)
  Previous project.-The original project was adopted by the River
and Harbor Act of June 18, 1878. The total cost and expenditure
thereunder was $14,000 for new work. For further details see page
1802 of Annual Report for 1915.
                  RIVERS AND HARBORS-NORFOLK,                                   VA., DISTRICT                         341
   Existing project.-This provides for clearing the 13 miles of river
below Franklin, Va., of obstructions, so as to afford a condition of
easy navigation for boats of 7-foot draft. The stream is nontidal.
The portion of the river under improvement is subject to freshets
of short duration, causing rises of 3 to 4 feet, but the general stage
of the river remains for the greater part of the time at the elevation
of Albemarle Sound, with which it connects. The estimate of cost
for new work made in 1907, exclusive of amount expended on pre-
vious projects, was $8,000. The latest (1928) approved estimate of
cost for annual maintenance is $2,000.
   The existing project was adopted by the River and Harbor Act of
March 2, 1907, in accordance with report published in House Docu
ment No. 177, Fifty-ninth Congress, first session. There is no pub-
lished map of this improvement.
   Terminal facilities.-There is a wharf and warehouse at Franklin,
Va., and three small wharves with warehouses between this point and
the mouth of the river. All of these are privately owned, but are
open to the general public on equal terms. The facilities are con-
sidered adequate for existing commerce.
   Operations and results during fiscal year.-N one.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1908, at a saving of $5,856 under the estimated cost. Logs,
snags, trees, and other obstructions have been removed at various
times, and there was an available depth of 7 feet at mean low water
between Franklin, Va., and the mouth of the river; at the last exami-
nation, made in May 1932. The head of navigation is at Burdette,
Va., 25 miles above the mouth. Navigation is practicable through-
out the year.
   The total cost and expenditure on the existing project was $26,200,
of which $2,144.33 was for new work and $24,055.67 was for
maintenance.
   Proposed operations.-No funds are available and no operations
are proposed during the fiscal year 1935.
   The sum of $4,000 can be profitably expended during the fiscal year
ending June 30, 1936, and will be applied to maintenance dredging,
snagging, and bank trimming during February and March, 1936.
                                    Cost   an~ financial summary
Cost of new work to June 30, 1934------------------------------$16, 144. 33
Cost of maintenance to June 30, 1934 ____-_________               24, 055. 67
                                                              -__________
      Total cost of permanent work to June 30, 1934__-___________ 40, 200. 00
      Net total expenditures_    ,_______________-_____________
                                    -         --                  40, 200. 00
Total amount appropriated to June 30, 1934__________ __ -____-40,     200. 00

           Fiscal year ending June 30                 1930         1931           1932                1933           1934


Cost of new work ....                                      ---.        .           .              .              .
Cost of maintenance-_.              .----------------$5, 006. 67 ------------      $3, 000                   _

Total expended........--------------------          4, 846. 93     $159. 74            3, 000 -
Allotted   ---.---------------------        ------------          3, 000. 00 _


Amount that can be profitably expended in fiscal year ending June 30,
1936, for maintenance-- ----          -----------                -   $4, 000
342     REPORT OF CHIEF OF ENGINEERS,                U. S.   ARMY,   1934

                          11. KNOBBS CREEK, N. C.

   Location.-This creek is a nontidal fresh-water stream emptying
into Pasquotank River from the west, about 18 miles above its
mouth in Albemarle Sound. (See U. S. Coast and Geodetic Survey
Chart No. 1228.)
   Existing project.-This provides for a channel 10 feet deep at
mean low water, from that depth in Pasquotank River to the Nor-
folk Southern Railroad bridge, 100 feet wide in Pasquotank River
and generally 60 feet wide in the creek, with a turning basin in the
sharp bend opposite the plant of the Chesson Manufacturing Co.
Being a branch of Pasquotank River, Knobbs Creek is affected by
the wind tides which influence that stream and Albemarle Sound.
In extreme cases the waiter rises 4 to 5 feet above mean low water,
but the average fluctuation of the water surface is about 1 foot.
    The estimate of cost for new work, made in 1927, was $79,000.
The latest (1927) approved estimate for annual cost of mainte-
nance is $500.
   The existing project was adopted by the River and Harbor Act
of July 3, 1930 (H.-Doc. No. 102, 70th Cong., 1st sess.). The latest
published map is in the project document.
   Local cooperation.-Fully complied with.
    Terminal facilities.-There are eight wharves with an aggregate
available frontage of 1,200 or 1,400 linear feet located on Knobbs
Creek. The existing wharves are adequate for the present com-
merce.
    Operations and results during fiscal year.-None.
    Condition at end of fiscal year.-The project was completed in
1931. The controlling depth in February 1933 was about 11 feet
at mean low water. The head of navigation is the upper Norfolk
Southern Railroad bridge, about 1.4 miles above the mouth, and
this feature has not been affected by the improvement. Navigation
is practicable throughout the year.
    The total cost and expenditures have been $80,500, all for new
work.
    Proposed operations.-No funds are available and no operations
are proposed during the fiscal year 1935.
    The additional sum of $5,000 can be profitably expended during
the fiscal year ending June 30, 1936, and will be applied to mainte-
nance dredging, snagging, and bank trimming during December
1934-February 1935.
                            Cost and financial summary

Cost of new work to June 30, 1934_________________________                  $80, 500
Cost of maintenance to June 30, 1934__

      Total cost of permanent work to June 30, 1934____________-__           80, 500
Net total expenditures      ---------------------------------------          80, 500
Total amount appropriated to June 30, 1934                                   80, 500
                     RIVERS AND HARBORS-NORFOLK, VA.,                                              DISTRICT          343

           Fiscal year ending June 30                        1930            1931           1932        1933      1934


Cost of new work.................                                         $70, 286. 65
                                                 ..------------------------------        $10, 213. 35
Cost of maintenance_                                       --
Total expended--------------------------------                            40, 135. 44     40, 364. 56
Allotted      ---------        -----------------        -----------       76, 500. 00      4, 000. 00


Amount allotted from War Department Appropriation Act approved
Mar. 4, 1933----------------------------------------------        $3, 000000.00
Deductions on account of revocation of allotment-------------------3, 000. 00

Amount that can be profitably expended in fiscal year ending June 30,
1936, for maintenance-----------------------------------                                                      5, 000.000.00

                                          12. MEHERRIN RIVER, N. C.

  Location.-Rises in Lunenburg County, Va., flows in a southeast-
erly direction a distance of about 126 miles and empties into the
Chowan River, N. C., at a point about 39 miles above Albemarle
Sound, N. C. (See U. S. Geological Survey, Winton quadrangle,
N. C.)
  Previous projects.-Adopted by the act of August 2, 1883. The
cost and expenditures under this project were $4,584.53 for new
work. For further details see page 1802 of Annual Report for 1915.
  Eisting project.-This provides for the removal of shoals, sunken
logs, snags, and other obstructions, so as to make the river safely
navigable for vessels of less than 7 feet draft between the mouth and
Murfreesboro, a distance of 12 miles. The entire stream is nontidal
and, except during freshets, its water surface rises and falls accord-
ing as the winds raise or lower the water level of Albemarle Sound.
Freshets cause variations of water level of from 3 to 4 feet in the
navigable portion of the river. The estimate of cost for new work,
made in 1907, exclusive of amount expended on previous project, was
$6,000. The latest (1928) approved estimate of cost for annual
maintenance is $2,000.
   The existing project was adopted by the River and Harbor Act of
March 2, 1907 (H. Doc. No. 137, 59th Cong., 1st sess.). For latest
map see House Document No. 112, Sixty-third Congress, first session.
   Terminal facilities.-There are 7 private wharves on Meherrin
River, 4 of which are located at Murfreesboro. All are of timber
construction with pile foundation and plank decking.         The total
berthing space at Murfreesboro is approximately 130 feet. Smith-
Douglas Co., fertilizer manufacturers, operate two of the wharves,
with large mixing plant, warehouse, office, and storage facilities.
This installation was recently constructed at a cost of $40,000. The
Standard Oil Co. has a wharf about 200 yards downstream from
the Smith-Douglas terminal. Storage tanks, with total capacity of
48,000 gallons, are supplied by pipe-lines running from the wharf.
The wharfage facilities are considered adequate for existing com-
merce.
                                 o
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1908 at a saving of $4,067 under the estimated cost. Logs,
snags, trees, and other obstructions have been removed at various
344         REPORT           OF CHIEF                 OF ENGINEERS,                     U.   S. ARMY,       1934


times, down to December 1932, when the latest snagging was done.
The controlling depth in August 1933, was 6.3 feet. The head of
navigation is at Skinners Landing, 21 miles above the mouth. Nav-
igation is practicable throughout the year.
   The total cost and expenditure on the existing project was $30,-
454.49, of which $1,932.88 was for new work and $28,521.61 was
for maintenance.
   Proposed operations.--The balance unexpended at the end of the
fiscal year, $4,000, will be applied to maintenance dredging, snag-
ging, and bank trimming with U. S. derrick barge No. 14, between
the mouth and Murfreesboro, during January-February 1935.
   It is believed that no funds can be profitably expended during
the fiscal year ending June 30, 1936, as it is expected that the work
contemplated will provide for the needs of navigation until a later
date.
                                               Cost and financial summary
Cost of new work to June 30, 1934_       -----------         $6, 517. 41
Cost of maintenance to June 30, 1934 _______________________ 28, 521.61
         Total cost of permanent work to June 30, 1934------------                                                    35, 039. 02

Net total expenditures ______--------------------------------35,                                                          039.02
Unexpended balance June 30, 1934--------------------------                                                             4, 000. 00
         Total amount appropriated to June 30, 1934-                                           -             -__ 39, 039. 02

         Fiscal year ending June 30                             1930             1931        1932         1933                1934


Cost of new work .--------------------------------
Cost of maintenance ...----------------            5, 017. 63                  $3, 321. 06   $678.94    $2, 754. 49
Total expended..........                  ..      ..--------------------
                                                                5, 017. 63      3, 321. 06    455. 44    2, 977. 99    _ _-      ------


Allotted-----        ------------------                       4, 000. 00     -------------------        2, 754. 49        $4, 000. 00


Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934___----------------------------------------      $4, 000. 00
Balance unexpended June 30, 1934_________________ _------____   4, 000. 00

                                               13. ROANOKE RIVER, N. C.

   Location.-This stream rises in the Blue Ridge Mountains, west
of Roanoke, Va., and flows southeasterly for about 200 miles to
Clarksville, Va., where it is joined by Dan River, its principal tribu-
tary; and thence, in the same general direction for about 198 miles
and empties into the westerly end of Albemarle Sound, N. C. (See
U. S. Coast and Geodetic Survey Chart No. 1228 and Post Route
Map of North Carolina.)
   Existing project.-This provides for dredging a channel 10 feet
deep and 150 feet wide between the 10-foot contour in Albemarle
Sound and the mouth, a distance of about 0.75 mile; removing ob-
structions between the mouth and Hamilton, N. C., a distance of 62
miles, so as to furnish a channel adequate for vessels navigating the
North Carolina sounds; and by dredging, snagging, and regulation,
securing a channel with a least width of 50 feet and a depth of 5 feet
between Hamilton and Weldon, N. C., a distance of 67 miles. Depths
of channels are referred to mean low water. The rise and fall of the
           RIVERS   AND HIARBORS--NORFOLK,         VA.,   DISTRICT         345
river, resulting from freshets, is from 10 feet to 30 feet for 60 or 70
miles below Weldon, but this fluctuation diminishes toward the
mouth, the variations in water level being from 1 foot to 3 feet in the
last 15 or 20 miles.
   The estimate of cost for new work, revised in 1930, is $315,500.
The latest (1930) approved estimate for annual cost of mainte-
nance is $4,000.
   The existing project was adopted by the following river and harbor
acts: The act of March 3, 1871, provided for the improvement of the
river between the mouth and Weldon (S. Ex. Doc. No. 23, 42d Cong.,
2d sess., and Annual Report for 1872, p. 726), and the act of July 3,
1930, provided for the entrance channel (H. Doc. No. 211, 70th Cong.,
1st sess.). For latest published maps see page 1110, Annual Report
for 1890, and House Document No. 211, Seventieth Congress, first
session.
   Terminal facilities.-There are 9 wharves at Plymouth, N. C., and
2 between this point and Weldon. There are also about 20 ware-
houses between the mouth of the river and Weldon. The facilities on
this stream are considered adequate for existing commerce.
   Operations and results during fiscal year.-Maintenance snagging,
with U. S. derrick barge No. 14, was performed at the mouth of the
river between October 27 and December 11, 1933, and between April
27 and May 4, 1934. The cost of the work was $3,629.90, all for
maintenance. The total expenditure was $3,312.65.
   Condition at end of fiscal year.-The project is about 87 percent
completed. Navigation between Albemarle Sound and Palmyra is
practicable throughout the year. Between the 10-foot contour in
Albemarle Sound and Hamilton, a distance of about 63 miles, there
was in June 1933 a controlling depth of about 8 feet, this depth
occurring between the mouth and the 10-foot contour in Albemarle
Sound. No recent examination has been made of the river above
Hamilton. When work in this section was suspended, it had a con-
trolling depth of 3 feet to a point 2 miles below Weldon.
   The work remaining to be done is the completion by dredging,
:snagging, and regulation of a channel between Hamilton and Wel-
don, a distance of 67 miles, to a depth of 5 feet over a least bottom
width of 50 feet.
   The total cost was $324,681.24, of which $267,137.41 was for new
work and $57,543.83 was for maintenance. The total expenditure
was $324,347.40.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $11,498.48, will be applied as follows:
Accounts payable June 30, 1934---------        _       -   ---        $333. 84
:Maintenance: Dredging, snagging, and bank trimming with U. S.
  derrick barge No. 14, between Albemarle Sound and Palmyra,
  N. C., a distance of 77 miles, during August-December 1934-------11, 164. 64

      Total for all work---------------------------------------      11, 498. 48
   It is believed that no funds can be profitably expended during
fiscal year ending June 30, 1936, as it is expected that the work
contemplated will provide for the needs of navigation until a later
<ate.
346         REPORT OF CHIEF OF ENGINEERS, U. S. AR1VY, 1934

                                  Cost and financial summary
Cost of new work to June 30, 1934----------------------------                                        $267, 137. 41
Cost of maintenance to June 30, 1934------------------------                                           57, 543. 88

     Total cost of permanent work to June 30, 1934 ------------                                       324, 681. 24
Minus accounts payable June 30, 1934 ________________------                                                333. 84

     Net total expenditures    -------------------------------                                        324, 347. 40
Unexpended balance June 30, 1934                 ------                                                11, 498. 48

        Total amount appropriated to June 30, 1934---------------335, 845. 88

         Fiscal year ending June 30              1930          1931            1932           1933             1934


Cost of new work  -------------------        ------------
Cost of maintenance.....-------------------$5, 409. 11
                                                             $6, 317. 01
                                                              6, 245. 32
                                                                           $33, 746. 28
                                                                             3, 324. 95
                                                                                          ----------------------
                                                                                            $7, 357. 33     $3, 629. 90

      Total cost-----------------------5, 409. 11            12, 562. 33    37, 071. 23      7, 357. 33        3, 629. 90
Total expended....-----------------------       5, 409. 11    6, 245. 32    41, 808. 95      8, 920. 03        3, 312. 65

Allotted .----------.........     ........      6, 000. 00   41, 400. 00     2, 000. 00      7, 000. 00       14, 794. 54


Balance unexpended July 1, 1933      ---------------------------- $16.59
Amount allotted from War Department Appropriation Act
approved Apr. 26, 1934                               $4, 800. 00
Amount allotted from War Department Appropriation Act
approved July 14, 1932____________                       000. 00
                                                       1---------------------------,
Amount allotted from War Department Appropriation Act
approved Mar. 4, 1933---- -------                     9, 000. 00
                                                                     14, 800. 00
     Amount to be accounted for                          ------                                            4, 816.59
                                                                                                          1----------------
Deductions on account of revocation of impounded funds---- ---                                                   5. 46
      Net amount to be accounted for------------------------                                              14, 811.13
Gross amount expended------------       ----- ---                                                          3, 312. 65
      Balance unexpended June 30, 1934-------       --------------- 11, 498.48
Outstanding liabilities June 30, 1934 ------- ---------------           333. 84
         Balance available June 30, 1934----------------------                                            11, 164. 64

Amount (estimated) required to be appropriated for completion of
existing project 1- - - - - - - - - - - - -       - - --
                                             _______      _ - - --
                                                                   48, 300. 00
                                14. SCUPPERNONG RIVER, N. C.

   Location.-This river rises in the center of a peninsula between
Albemarle and Pamlico Sounds. It flows in a general northerly di-
rection, making a long bend eastward to the town of Columbia, then
turning westward again until it flows into Albemarle Sound. (See
U. S. Coast and Geodetic Survey Chart No. 1228.)
   Previous projeots.-Adopted by acts of March 3, 1879, and June
13, 1902. The cost and expenditures thereunder were $21,248.68 for
new work and $13,061.56 for maintenance, a total of $34,310.24. For
further details see page 1802 of Annual Report for 1915.
   Existing project.-This provides for a channel 10 feet deep and
150 feet wide on bottom across the bar; thence 10 feet deep and 100
   1Exclusive of available funds.
           RIVERS AND HARBORS-NORFOLK,              VA.,   DISTRICT        347
feet wide on bottom up to and in front of the town of Columbia;
thence 8 feet deep and 40 feet wide on bottom to Spruills Bridge,
near Creswell, including six cut-offs; thence 7 feet deep and 30 feet
wide on bottom to the highway bridge near Cherry; and a turning
basin 7 feet deep, of a triangular form 150 feet wide on a side, near
Cherry Bridge, at the mouth of Mauls Creek.
   The plane of reference is mean low water. This is a nontidal
stream, the oscillations of the surface being controlled by the winds,
which cause ordinary variations of 1 foot. The extreme range of
wind tides is 5.1 feet, as determined by one year's tide-gage read-
ings. The estimate of cost for new work, revised in 1925, was
$59,000, exclusive of amount expended on previous projects. The
latest (1928) approved estimate for annual cost of maintenance is
$2,500.
   The project was authorized by the River and Harbor Act of March
2, 1919 (H. Doc. No. 1196, 62d Cong., 3d sess.). The latest published
map is in the project document.
   Terminal facilities.-There are 11 wharves, piers, etc., on Scup-
pernong River, of which 9 are located at Columbia. The total berth-
ing space at Columbia is about 300 feet. All wharves are privately
owned and operated. The present facilities appear to be adequate
for existing commerce.
    Operations and results during fiscal year.-Maintenance dredging
and snagging with U. S. derrick barge No. 14 was commenced on
July 20, 1933, and continued to October 25, 1933, when the work was
completed. The river was worked over between Cherry and Cross
Landing, a distance of about 7 miles. The cost of the work was
$4,906.20, all for maintenance. The total expenditure was $4,906.20.
    Condition at end of fiscal year.-The project was completed in
1925, resulting in channels having mean low-water depths as follows:
Across the bar at the mouth, about 0.5 mile, 10 feet; from the bar to
the town of Columbia, about 4.5 miles, 10 feet; Columbia to Spruilis
Bridge, near Creswell, 12.5 miles, 8 feet; Spruills Bridge to Cherry,
2.5 miles, 7 feet; and a turning basin at the mouth of Mauls Creek,
near Cherry, triangular in shape, 150 feet on a side and 7 feet deep,
having an area of 9,740 square feet. The head of navigation is at a
highway bridge near Cherry, 20 miles above the mouth. Boat navi-
gation is practicable throughout the year.
    The total cost and expenditure was $84,710.69, of which $59,914.95
was for new work and $24,795.74 for maintenance.
    Proposed operations.--The balance unexpended at the end of the
fiscal year, $8.51, will be applied to maintenance contingencies.
    The additional sum of $11,500 can be profitably expended during
the fiscal year ending June 30, 1936, and will be applied as follows:
Maintenance:
    Dredging for widening the channel at a bend in the vicinity of spar
      buoy no. 5, about 2 miles below the bridge at Columbia, by contract,
      12,600 cubic yards, September 1935---------------------------- $6, 500
    Snagging and bank trimming between the mouth and Cherry with
      U. S. derrick barge No. 14, during April-May 1936_____________       5, 000
        Total for all work_ --------                                      11, 500
  The proposed expenditure exceeds the average for the last 5 years
because of the dredging required to relieve navigation hazards en-
348         REPORT         OF CHIEF OF ENGINEERS, U.                               S. ARMY,             1934

countered, especially at night, at a very sharp bend about 2 miles
below the town of Columbia.
                                     Cost and finanoial summary
Cost of new work to June 30, 1934---------------------------$81,     163. 63
Cost of maintenance to June 30, 1934--111111111111111111__       37, 857. 30
         Total cost of permanent work to June 30, 1934                                                             020. 93
                                                                                                             1-------------19,
Net total expenditures  ------------------------------------ 119, 020. 93
Unexpended balance June 30, 1934--------------------------------    8. 51
         Total amount appropriated to June 30, 1934--------------119, 029. 44

         Fiscal year ending June 30                     1930          1931          1932            1933             1934

Cost of new work ............
                           "               - --   ---
Cost of maintenance.......------------------- $9, 357. 44
                                                                            i---
                                                                    $4,790. 13
                                                                                    -....
                                                                                    $114. 76 ------------           $4, 906. 20
Total expended         .      ..-----------------------9, 357. 44    5,339. 60       302.96    --   -    -   -       4, 906. 20
Allotted..........----------------------------       10, 177. 53 --------------------------------                    4, 914.71


Amount allotted from War Department Appropriation Act approved
Mar. 4, 1933     -------------------------------------------      $5, 000. 00
Deductions on account of revocation of impounded funds -----------      85. 29

      Net amount to be accounted for-------------------------4,                                                      914. 71
Gross amount expended     ------------------------------------                                                    4, 906. 20

         Balance unexpended June 30, 1934--------------------------                                                    8. 51

Amount that can be profitably expended in fiscal year ending June 30,
                                                                                           _
  1936, for maintenance                      __------------                                                      11, 500. 00

                       15. MANTEO              (SHALLOWBAG)                      BAY, N. C.

   Location.-Manteo Bay or Shallowbag Bay, formed by a natural
indentation of the shore line, is situated on the northeastern side of
Roanoke Island, N. C. (See U. S. Coast and Geodetic Survey Chart
No. 1229.)
   Existing project.-This provides for a channel 100 feet wide and
6 feet deep at mean low water from that depth in Roanoke Sound
to the town of Manteo, a distance of about 22/3 miles. The variations
of the water surface are due to winds, such variations seldom ex-
ceeding 1 or 2 feet higher or lower than the mean stage. The ex-
treme range of wind tides is 5.1 feet, as determined by 1 year's
tide-gage readings at Manteo. The estimate of cost for new work,
made in 1908, was $13,750. The latest (1908) approved estimate of
cost for annual maintenance is $2,000.
   This project was adopted by the River and Harbor Act of June 25,
1910 (H. Doc. No. 906, 60th Cong., 1st sess.). The latest published
map is in the last-mentioned document.
   Terminal facilities.-There are 17 wharves on the portion of this
harbor under improvement. They have a total frontage of 1,060
feet. The existing facilities are considered adequate for the present
commerce.
  1Exclusive of available funds.
                     RIVERS AND HARBORS-NORFOLK,                                                  VA.Y     DISTRICT                 349

   Operations and results during fiscal year.-Maintenance dredging
under contract for the restoration of project dimensions in Manteo
Harbor was commenced on June 7, 1934, and continued to the end of
the fiscal year, when the contract was 45 percent completed. The
work resulted in the removal of 4,246 cubic yards of material, and the
restoration of about 50 feet of channel. The cost of the work was
$827.72, all for maintenance. The total expenditure was $674.30.
   Condition at end of fiscal year.-The project was completed in 1911.
The controlling depth in October 1933, when the last examination
was made, was 6 feet at mean low water, except for a distance of
about 400 feet, in front of the wharves at Manteo, where 3-foot depths
existed. The head of navigation, at Manteo, has not been affected
by the improvement. Navigation is practicable throughout the year.
   The total cost was $49,677.72, of which $10,503.18 was for new work
and $39,174.54 was for maintenance. The total expenditure was
$49,524.30.
   Proposed operations.--The balance unexpended at the end of the
fiscal year, $5,313.35, will be applied as follows:
Accounts payable June 30, 1934---------               --------------------- $153.42
Maintenance: Maintenance dredging under an existing contract, for
  the restoration of project dimensions in Manteo Harbor, 5,242 cubic
  yards, July 1934-----------      ------------------------------          5,159. 93

            Total for all work                             ------------------------------------                               5, 313. 35
   It is believed that no funds can be profitably expended during the
fiscal year ending June 30, 1936, as it is expected that the work con-
templated will provide for the needs of navigation until a.later date.
                                               Cost and financial summary
Cost of new work to June 30, 1934------------------------- $10, 503. 18
Cost of maintenance to June 30, 1934-------------------------- 39, 174. 54

      Total cost of permanent work to June 30, 1934-------------49, 677. 72
Minus accounts payable June 30, 1934--------------------------      153. 42
     Net total expenditures --------------------------------                                                                49, 524. 30
Unexpended balance June 30, 1934-----                                                                                        5, 313. 35
            Total amount appropriated to June 30, 1934---------------                                                       54, 837. 65

            Fiscal year ending June 30                            1930             1931             1932        1933               1934

Cost   of   new   work--

Cost of maintenance------------------...................      $23, 399. 09 ----....------------                             _-----------------
                                                                                                                                     $827.  72
Total expended-             .-.                    ..----------------------
                                                                 23, 399. 09 ......                       --
                                                                                              .............--           .            674. 30
Allotted-----........------------------...........
                                  7, 500.
                                        00 ----------------------....------------                                                  5,987. 65


Amount allotted from War Department Appropriation Act approved
  Mar. 4, 1933     ------------------------------------------        $12, 000. 00
Deductions:
    Revocation of allotment----------------------- $6,000. 00
    Revocation of impounded funds--------------------         12. 35
                                                                       6,012. 35
      Net amount to be accounted for--- -                                             -        -     --             -         5, 987. 65
Gross amount expended--------          _                                                      ------           __                674. 30
             Balance unexpended June 30, 1934---
                                            ..........                                                                        5, 313. 35
350     REPORT OF CHIEF OF ENGINEERS,            U.   S. ARMY,   1934

Outstanding liabilities June 30, 1934--------------------- $220. 30
Amount covered by uncompleted contracts---------------5, 084. 24
                                                                      $5, 304. 54

      Balance available June 30', 1934-----------------                     8. 81

                        16. MACKAY CREEK, N. C.

   Location.-Mackay (Mackeys) Creek has its source in a swamp
about 10 miles southeast of Plymouth, N. C., from which it flows in
a generally northerly direction and empties into Albemarle Sound
at a point about 5 miles east of the mouth of Roanoke River.
   Existing project.-This provides for the construction of a channel
9 feet deep at low water over a bottom width of 100 feet across the
bar at the mouth of the creek, a distance of about 2,200 feet; and for
the removal of obstructions between the sound and Mackeys, a
distance of about five-eighths mile. The tides in the creek, as in
Albemarle Sound, are due almost entirely to winds alone, and cause
variations in water surface at the mouth amounting to 1 foot, or 1.5
feet above or below the low-water plane. The influence of such tides
is noticeable as far upstream as the third bridge, a distance of about
12.5 miles from the mouth.
   The estimate of cost for new work, revised in 1927, was $13,375.
There is no approved estimate of cost for annual maintenance.
   The existing project was authorized by the following river and
harbor acts: The act of September 19, 1890, provided for dredging
the channel across the bar at the mouth of the creek (Annual Report
for 1889, p. 1137); and the act of July 3, 1930, provided for the
removal of obstructions from the creek between the sound and the
town of Mackeys (H. Doc. No. 775, 69th Cong., 2d sess.). The
latest published map is in the last-mentioned document.
    Terminal facilities.-The.principal wharf on the creek is located
at the town of Mackeys and is under control of the Edenton-
Mackeys Ferry Co. There are five or six privately owned fishing
and logging wharves located upstream from Mackeys. All wharves
are connected to the highways of the locality and are open to the
public on payment of a nominal sum for wharfage. The existing
wharves are adequate for the present commerce.
    Operations and results during fiscal year.-Maintenance snagging,
with U. S. derrick barge No. 14, was performed between the mouth
and the town of Mackeys during the period December 13, 1933, and
January 5, 1934. The total cost and expenditure was $1,174.07, all
for maintenance.
   Condition at end of fiscal year.-The project was completed in
1932. Dredging completed in 1893 resulted in a channel 9 feet deep
at mean low water and 140 feet wide across the bar at the mouth,
in Albemarle Sound, a distance of 2,200 feet. Sunken logs, snags,
and trees have been removed and some dredging done since for
maintenance, while new work snagging was done during the fiscal
year 1932 for the completion of the project. There was an avail-
able depth of 9 feet at low water between the outer end of the
dredged channel and Mackeys, a distance of about 1 mile, at the
last examination, which was made in January 1934. The head of
                  RIVERS AND HARBORS-NORFOLK,                                             VA.y DISTRICT                                351
navigation is at Roper, N. C., a distance of about 6.5 miles above
the mouth, and this feature has not been affected by the improve-
ment. Navigation is practicable throughout the year.
  The total cost and expenditure on the existing project at the end
of the fiscal year was $18,147.63, of which $13,374.60 was for new
work and $4,773.03 was for maintenance.
    Proposed operations.The balance unexpended at the end of the
fiscal year, $325.52, will be applied to inspection of the waterway
during the fiscal year 1935.
  It is believed that no funds can be profitably expended during
the fiscal year ending June 30, 1936, as it is expected that the work
done during the fiscal year 1934 will provide for the needs of navi-
gation until a later date.

                                          Cost and financial summary
Cost of new work to June 30, 1034-....                                                                                    $13, 374. 60
Cost of maintenance to June 30, 19341111111111111111                                                          __            4, 773. 03
          Total cost of permanent work to June 30, 1934--------------                                                      18, 147. 63
Net total expenditures   ----------------------------------    18, 147. 63
Unexpended balance June 30, 1934------------------------------     325. 52
         Total amount appropriated to June 30, 1934--------------- 18, 473. 15

         Fiscal year ending June 30                         1930            1931               1932           1933                  1934


Cost of new work..               ..        ..----------------------------------------
                                                                                 $1, 100. 00 ----                  .............
Cost of maintenance-.__--             _--___               _________-_____ ____________ . __-_-   .                  ..            $1, 174. 07
Total expended....-___              -
                           _______________          __     -        ___                      1,057. 95
                                                                                         ......-               $42. 05              1, 174. 07
Allotted.........----------------------------               $634. 73      $1, 100. 00                                               1, 499. 59


Amount allotted from War Department Appropriation Act approved
   Mar.     4,   1933__---------------------------------                                              -----                $1, 500.00
Deductions on account of revocation of impounded funds--                                                                                . 41

      Net amount to be accounted for------------------                                                                      1, 499. 59
Gross amount expended-----------------------------------                                                                    1, 174. 07

         Balance unexpended June 30, 1934--------------------------                                                                325. 52

   17. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                               (GENERAL)

   The cost of the work during the fiscal year was $38,203.89 and
the expenditure was $40,000.45. The balance unexpended June 30,
1934, $46,046.85 will be applied as needed during the fiscal year 1935
to payment of expenses to be incurred in connection with the above
items. The additional sum of $45,000 can be profitably expended
during the fiscal year ending June 30, 1936.
                                          Cost and financial summary
Cost of maintenance to June 30, 1934---------------------------                                                       $209, 342. 86
Minus accounts payable June 30, 1934_               __--__
                                            ----------------                                                              2, 685.91

         Net total expenditures----------                                               -------------                     206, 656. 95
Unexpended balance June 30, 1934___ __------------------------                                                             46, 046. 85
         Total amount appropriated to June 30, 1934__ ________-                                                           252, 703. 80
        91536---ENG 1934------23
352              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                                  1934


            Fiscal year ending June 30                               1930               1931            1932              1933            1934


Cost of new work_-..................--                           ..---------
Cost of maintenance----------------
                  .................--. $47, 949. 36                               $27, 366. 61       $43, 220. 45 $34, 193.31           $38, 203. 89

Total expended----------------------..........................     47, 831. 06      29, 543. 36      40, 404. 46       34, 291. 96       40, 000. 45
Allotted---------- -.-----------                         ------ 40, 780. 00         52, 500. 00       10, 000. 00      36, 271. 02       79, 032. 78



Balance unexpended July 1, 1933-__                                                                                                   $7, 014. 52
Amount allotted from the War Department Appropria-
  tion Act approved Apr. 26, 1934 ----------------- $40, 000. 00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933 ----------------------    40, 000. 00
                                                                                                                                     80, 000.00

      Amount to be accounted for_____                                                                                                87, 014. 52
Deductions on account of revocation of allotment--------------                                                                           967.22

      Net amount to be accounted for                                                                                                 86, 047. 30
Gross amount expended____--_--__--------------------                                                     40, 267. 03
Less reimbursements collected-----------------                                                     -----     266. 58
                                                                                                                                            00~'e .i
                                                                                                                                     40 ,V,VVV.

      Balance unexpended June 30, 1934-.           __------------- -                                                                 46, 046. 85
Outstanding liabilities June 30, 1934____________________________                                                                     2, 685. 91
            Balance available June 30, 1934 ---                                                _____-_____-43, 360. 94

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1_______                                                                                                  45, 000. 00

                       18. Other projects for which no, estimates are submitted
                             [Commercial statistics for these projects are given in pt. 2 of report]

                                                                               For last        Cost and expenditures to              Estimated
                                                                               full re-              June 30, 1934                   Estimated
                           Name of project                                     port see                                               required
                                                                                                                                         to
                                                                               report
                                                                                for-           New work        Maintenance            complete

1. Nansemond River, Va.                      ---------------------               1932          $167, 477. 11        $48, 625. 61          (2)
2. Willoughby Channel, Va.'------_----                           ------          1933             8, 500. 00   --------------             (2)
3. Edenton Harbor, N. C.1_ __---------------------                               1932          73, 750. 00 --------------                 (2)
4. Cashie River, N. C...... ------------------------
                                     .............                               1932     --------------                                    $5,00
5. Hampton Creek, Va.'.-.-.-..------------                                       1892            22, 000. 00-------------               -(2)
6. Perquimans River, N. C.1-..-.------------.                                    1910            13, 750. 00-------                        (2)

  1Channels adequate for commerce.
  2Completed.
  8 Awaiting local cooperation.
   1
       Exclusive of available funds.
           RIVERS AND HARBORS-WILMINGTON,                                      N.   C., DISTRICT            353
Status of reports called for by river and harbor acts and committee resolutions


                                                     TransmittedRecommen-
       Locality            Authorization act             to         House document                 Reommen-
                                                      Congress                                       dation

Cape Charles Harbor, River and Harbor Act,           Mar. 12, 1934 -----------------------         Unfavorable.
Va.                       July 3, 1930.
Drummond Lake, Va., ----- do.-- --- - - - -          --     -     - -     --   - - - - - -
  locks at.
James River, Va-..._.__ Rivers and Harbors           -             - -
                          Committee resolu-
                           tion, May 26, 1933.
Meherrin River, N. C.,    Rivers and Harbors
mouth to Murfrees-         Committee resolu-
boro.                     tion, Jan. 29, 1934.
Norfolk Harbor, Va.,      River and Harbor Act,      Oct.       2, 1933   No. 182, 73d Cong., 2d   Favorable.
southern branch of        July 3, 1930.                                   sess.
  Elizabeth River.
Norfolk, Va., to Beau-
fort Inlet, N. C., In-
                          Rivers and Harbors         July 26, 1933        ----------------         Unfavorable.
                           Committee       resolu-
land Waterway.            Jan. 25, 1930.
Norfolk, Va., to sounds   River and HarborAct,       Nov. 23, 1933        -----------------------     Do.
  of North Carolina,       July 3, 1930.
including    D is ma 1
  Swamp Canal.
Scuppernong    River,     Rivers and Harbors
  N. C.                     Committee resolu-
                            tion, Jan. 30,1934.


   IMPROVEMENT OF RIVERS AND HARBORS IN THE
           WILMINGTON, N. C., DISTRICT
   This district includes river and harbor improvements in central
and eastern North Carolina from Pamlico River to Shallotte River,
N. C., near the State line, embracing the watersheds of all rivers in
North Carolina within the limits stated and that portion of the in-
tracoastal waterway between Norfolk, Va., and Beaufort Inlet, N. C.,
south of and including the crossing of the New Holland, Higgins-
port & Mount Vernon Railroad crossing in Hyde County, N. C., as
well as the portion of the intracoastal waterway from Cape Fear
River, N. C., to Winyah Bay, S. C., north of Little River, S. C.
  District engineer: Maj. R. A. Wheeler, Corps of Engineers, to
September 20, 1933, and Lt. Col. Eugene Reybold, Corps of En-
gineers, since that date.
  Division engineer: Col. T. H. Jackson, Corps of Engineers, to
June 28, 1934, and Col. Earl I. Brown, Corps of Engineers, since
that date.




                                                                                                                           ###
                                                                                                                                  .4.

                                                                                                                  :




                                                                                                                      ,.     is
354      REPORT OF CHIEF          OF ENGINEERS,        U.   S. ARMY,   1934

                                      IMPROVEMENTS

                                       Page                                      Page
1. Inland waterway from Nor-                 16. Intracoastal waterway, Cape
      folk, Va., to Beaufort In-                    Fear River, N. C., to Win-
       let, N. C_--_                    334          yah Bay, S. C ..........    378
2. Waterway connecting Swan                  17. Morehead City Har bor,
     Quarter Bay with Deep                          N. C---------------           384
       Bay, N. C-       --              354   18. Beaufort Inlet, N. C________    386
3. Belhaven Harbor, N. C____           355   19. Harbor of Refuge at Cape
4. Far Creek, N. C _                   356         Lookout, N. C____             387
5. Pamlico and Tar Rivers,                   20. Cape Fear River, N. C., at
       N. C-_-     __                  357          and below Wilmington___      388
6. South River, N. C ........         360    21. Cape Fear River, N. C.,
7. Silver Lake Harbor, N. C___        361          above Wilmington ______      391
  8. Neuse River, N. C ........        362    22. Northeast       (Cape Fear)
9. Swift Creek, N. C __--....         364         River, N. C--_-----------     396
10. Contentnea Creek, N. C ....        365    23. Black River, N. C___ ....      398
11. Trent River, N. C ..........       367    24. Operating and care of Locks
12. Channel connecting Thor-                        and Dams Nos. 1 and 2,
      oughfare Bay with Cedar                       Cape Fear River, N. C____    400
      Bay, N. C_                       369    25. Examinations, surveys, and
13. Beaufort Harbor, N. C__ __         370          contingencies (general) __   401
14. Waterway connecting Pam-                  26. Other projects for which no
      lico Sound and Beaufort                       estimates are submitted__    402
      Harbor, N. C_____ -...           372
15. Inland waterway, Beaufort
      to Cape Fear River, N. C.,
      including waterway         to
      Jacksonville, N. C______         375
1. INLAND   WATERWAY FROM NORWALK, VA., TO BEAUFORT INLET,
     N. C. (SECTION EXTENDING FROM AND INCLUDING THE CROSS-
      ING OF THE NEW HOLLAND, HIGGINSPORT & MOUNT VERNON
      R. R. TO BEAUFORT INLET)

  For report on this improvement see page 334.
2. WATERWAY           CONNECTING SWAN QUARTER BAY WITH DEEP
                                 BAY, N. C.

   Location.-This waterway is a cut 5,500 feet long through the
narrow neck of marshland just west of Swan Quarter Bay, on the
north side of Pamlico Sound, near the mouth of Pamlico River.
(See U. S. Coast and Geodetic Survey Chart No. 1231.)
   Existing project.-This provides for securing by dredging a chan-
nel 5,500 feet long, 50 feet wide at the bottom, and 6 feet deep at
mean low water. Variations in the water surface due to winds
seldom exceed 1 or 2 feet above or below mean stage. From observa-
tions covering a period of 4 years the extreme range of wind tides
is 8.3 feet. The estimate of cost for new work, made in 1907, was
$14,575. The latest (1928) approved estimate for annual cost of
maintenance is $600.
   This project was adopted by the River and Harbor Act of June
25, 1910 (H. Doc. No. 445, 60th Cong., 1st sess.). For latest pub-
lished map see page 1734 of the Annual Report for 1912.
   Terminal facilities.-There are no wharves along this waterway
and none are needed.
  Operations and results during fiscal year.-None.
  Condition at end of fiscal year.-The existing project was com-
pleted in 1911 at a saving of $6,024 under the estimated cost.                   At
               RIVERS AND HARBORS-WILMINGTON,                              N.     C., DISTRICT                     355


the close of the fiscal year project dimensions prevailed. The cost
and expenditures were $8,550.98 for new work and $10,433.40 for
maintenance, a total of $18,984.38.
  Proposed operations.-No funds are on hand, and no work is pro-
posed during the fiscal year ending June 30, 1935.
  The sum of $3,000 can be profitably expended during the fiscal year
ending June 30, 1936, and will be applied to the maintenance of the
waterway, under contract, during July 1935.
                                     Cost and financial sa              mary
Cost of new work to June 30, 1934_-------------------------_--_                                           $8, 550.98
Cost of maintenance to June 30, 1934----------------------------                                          10, 433. 40
      Total cost of permanent work to June 30, 1934    --                                           ___   18, 984. 38
Net total expenditures_     --------------------------------                                              18, 984. 38
Total amount appropriated to June 30, 1934__                                                              18, 984. 38

         Fiscal year ending June 30                   1930       1931          1932             1933          1934


Cost of new work                                                                      -                        -
Cost of maintenance                        -                 -                            -   ---              -

Total expended -------------     -             -$1,    091. 38                                                     --

Allotted ...


Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance -------------------------              $3, 000. 00

                               3. BELHAVEN HARBOR, N. C.

   Location.-The town of Belhaven is located at the junction of
Pantego Creek and Pungo River, about 11 miles above the mouth
of the latter. The harbor consists of the lower reaches of Pantego
Creek, and is about 6,000 feet long. Pungo River forms part of
the Inland Waterway from Norfolk to Beaufort, Norfolk being 130
miles north of Belhaven, and Beaufort 66 miles south. (See U. S.
Coast and Geodetic Survey Chart No. 1231.)
   Existing project.-This provides for a channel 12 feet deep at
mean low water and 100 feet wide, extending from deep water in
Pungo River to a point about 800 feet east of the highway bridge,
with a turning basin 800 feet long and 300 feet wide at the upper
end. It is a nontidal stream with little slope. Variations in the
water surface, due to winds, seldom exceed 2 feet above or below
mean stage.
   The estimiate of cost for new work, made in 1927, was $55,000.
The latest (1927) approved estimate for annual cost of maintenance
is $5,000.
   This project was authorized by the river and harbor act approved
July 3, 1930 (HI. Doc. No. 778, 69th Cong., 2d sess.). The latest
published map is contained in this document.
   Local cooperation.-Fully complied with.
   Termninal facilities.-There are 10 wharves along the town water-
front, all of timber construction. One is owned by the town and
is open to use by all without charge; four have rail connections.
356         REPORT           OF        CHIEF OF ENGINEERS,                              U.    S.     ARMY,          1934


The facilities are considered adequate for the existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The project was completed in
August 1931 at a saving of $1,500 under the estimated cost. At the
close of the fiscal year the project depth of 12 feet at mean low
water was available to Belhaven. The cost and expenditures were
$53,500, all for new work.
   Proposed operations.--No funds are on hand and no work is
proposed during the fiscal year ending June 30, 1935.
   The sum of $15,000 can be profitably expended during the fiscal
year ending June 30, 1936, and will be applied to the maintenance
of the channel, under contract during March 1936.
                                               Cost and financial summary

Cost of new work to June 30, 1934---                                                                                     $53, 500. 00
Cost of maintenance to June 30, 1934__                                              -------

         Total cost of permanent work to June 30, 1934--                                                       -           53, 500. 00
Net total expenditures________________________                                                                             53, 500. 00
Total amount appropriated to June 30, 1934 __------                                                            --          53, 500. 00


         Fiscal year ending June 30                           1930               1931              1932        1933              1934


Cost of new work .....-..                  -       -     -      --            $25, 972. 88 $27, 527. 12-            -   -    ----------
Cost of maintenance                          ----
                               -----------------             ..........-- -   - -----      ----      -------        ----------- --
Total expended----          -----                                               6, 131. 32    47, 368. 68   ------------
Allotted-----------------           ----        -----   --------
                                                             -                 51, 000. 00     2, 500. CO ------------


Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance       ______________
                             --------------                       $15,-000

                                                  4. FAR CREEK, N. C.

    Location.--Far Creek is located in Hyde County, N. C., and flows
in an easterly direction into Palmlico Sound at a point about 95
miles south of Norfolk, Va. (See U. S. Coast and Geodetic Survey
Chart No. 1232.)
   Existing project.-This provides for a channel 7 feet deep at
mean low water and 60 feet wide from Pamlico Sound to a point
about 200 feet below the highway bridge at Engelhard, with a turn-
ing basin at the head. There is some lunar tide in Pamlico Sound,
but the principal variations in the level of the water surface are due
to winds. Ordinary winds cause a variation of about 1 foot, while
severe storms will double or triple this variation.
    The estimate of cost for new work, made in 1929, was $30,000.
The latest (1929) approved estimate for annual cost of maintenance
is $2,000.
    The project was authorized by the River and Harbor Act ap-
proved July 3, 1930 (H. Doc. No. 112, 71st Cong., 1st sess.). The
latest published map is contained in this document.
    Local cooperation.-Fully complied with.
    Terminal facilities.-There are two wharves at Engelhard. One
is 100 feet by 3 feet and one 25 feet by 7 feet. The existing facili-
ties are considered adequate for present commerce.
              RIVERS AND HARBORS-WILMINGTON,                                          N.     C., DISTRICT           357

   Operations and results during fiscal year.-The work consisted of
maintenance dredging under contract. The contractor removed
72,708 cubic yards of material from the waterway, which resulted
in restoring the channel to project dimensions. The total cost was
$19,486.10, all for maintenance. The total expenditures were
$15,860.30.
   Condition at end of fiscal year.-The project was completed in
May 1931. At the close of the fiscal year the project depth of 7 feet
at mean low water was available. The cost was $34,500 for new
work and $19,486.10 for maintenance, a total of $53,986.10. The
total expenditures were $50,360.30.
   Proposed operations.-The balance unexpended July 1, 1934, $3,-
625.80, will be applied to liquidating accounts payable on that date.
   No work is proposed during the fiscal years ending June 30, 1935,
and 1936, as it is believed that no maintenance dredging will be
required.
                                          Cost and financial summary

Cost of new work to June 30, 1934______________________------- $34, 500. 00
Cost of maintenance to June 30, 1934_______________--------19, 486. 10
     Total cost of permanent work to June 30, 1934 ___________ 53, 986. 10
Minus accounts payable June 30, 1934------------------------- 3, 625. 80

     Net total expenditures--    ---------------------------                                                  50, 360. 30
Unexpended balance June 30, 1934 _________.                                                                    3, 625.80

          Total amount appropriated to June 30, 1934__________                                                53, 986. 10

          Fiscal year ending June 30                          1930       1931              1932       1933        1934

Cost of new work---------.........-..........                         $34, 500.00 -----------------...---------
Cost of maintenance-                        _--_     _-----                   ----
                                                                     _---- ______-_ __        _____________     $19, 486.10
Total expended_--------.----------__               ------------       34, 500. 00 ------------------             15, 860. 30
Allotted----------------------------                   ---------- 34, 500. 00       ----------------------       19, 486.10


Amount allotted from War Department Appropriation Act approved
  Mar. 4, 1933__--  ---------------------------------------- $19, 500. 00
Deductions on account of revocation of impounded funds----------   13. 90

      Net amount to be accounted for __  ___________________                                                  19, 486. 10
Gross amount expended_        ___________________________                                                     15, 860. 30
      Balance unexpended June 30, 1934_________________________                                                3, 625. 80
Outstanding liabilities June 30, 1934 _____________________________                                            3, 625. 80

                               5. PAMLICO AND TAR RIVERS, N. C.

    Location.-The two names are applied to the same river, it being
known as the Pamlico below Washington, N. C., and as the Tar above
that point. This stream rises in Person County, flows in a general
southeasterly direction for 217 miles, and empties into Pamlico
Sound. The Pamlico River is 38 miles long. (See U. S. Coast and
Geodetic Survey Chart 537.)
  Previous projects.-Adopted by acts of July 4, 1836, and August
30, 1852. The cost and expenditures on this 'project were $15,000.
358     REPORT OF CHIEF OF ENGINEERS,       U.   S.   ARMY,   1934

    Existing project.-This provides for a channel 12 feet deep at
mean low water and 200 feet wide from the 12-foot contour in the
river below Washington to the Atlantic Coast Line railroad bridge
at Washington; 6 feet deep and 75 feet wide to Greenville; 20 inches
deep and 60 feet wide to Tarboro; thence to clear the natural channel
above Tarboro to Little Falls. The length of section under improve-
ment is 93 miles, extending from a point 10 miles below Washington
to Little Falls. The stream is nontidal; variations in the water sur-
face at Washington, due to prevailing winds, seldom exceed 2 feet.
The extreme range of the flood or freshet stage for the upper section
is 34 feet at Tarboro. For the lower section, observations covering
a period of 4 years show an extreme range due to winds of 8.3
feet.
    The estimate of cost for new work, revised in 1930, was $384,700,
exclusive of amount expended on previous project. The latest
 (1930) approved estimate for annual cost of maintenance is $17,000.
    The existing project was authorized by the following river and
harbor acts: The act of August 14, 1876, authorized a channel of 9
feet from the mouth to Washington; the act of May 3, 1879, provided
for the section of the river between Washington and Tarboro
 (H. Doc. No. 68, 45th Cong., 3d sess.); the section of the river be-
tween Tarboro and Little Falls (Rocky Mount) was added to the
project in 1890 (Annual Report for 1889, p. 1130); the River and
Harbor Act of March 2, 1907, authorized changing the depth between
Washington and Greenville (H. Doc. No. 342, 59th Cong. 2d sess.);
the River and Harbor Act of July 25, 1912, covered the latest modi-
fication of the portion between Washington and Greenville and
authorized increase in depth from the mouth to Washington from 9
to 10 feet (H. Doc. No. 270, 62d Cong., 2d sess.); and the act ap-
proved July 3, 1930 (Rivers and Harbors Committee Doc. No. 11,
71st Cong., 1st sess.), provided for the 12-foot channel. The latest
published maps are in the two last-mentioned documents.
    Recommended modifications,of project.-The abandonment of this
improvement above Tarboro, N. C., is recommended in House Docu-
ment No. 467, Sixty-ninth Congress, first session.
    Terminal facilities.-There are 72 wharves on the portion of this
river under improvement, of which 50 are along the water front at
Washington, N. C., 1 on Castle Island in front of town, 2 across the
river from town, 8 between Washington and the mouth, and 11 be-
tween Washington and the mouth of Fishing Creek. They have a
total frontage of 4,635 feet. The existing facilities are not con-
sidered adequate at Washington, Greenville, or Tarboro. For
further details see page 535, Annual Report for 1932.
    Operations and results during fiscal year.-The work consisted
of maintenance dredging under contract and snagging with Gov-
ernment plant and hired labor. The contractor removed 52,789
cubic yards of material from the channel in front of Washington,
which resulted in restoring the channel at and below Washington
to project dimensions. The derrick boat Contertnea cleared the
channel of obstructions between Washington and a point 48 miles
above. The cost was $17,698.42, all for maintenance. The expendi-
tures were $17,437.25.
              RIVERS AND HARBORS-WILMINGTON,                                         N. C., DISTRICT                           359
   Condition at end of fiscal year.-The project was completed in
July 1931. At the close of the fiscal year the project depth of 12
feet at mean low water was available from the mouth to and in
front of Washington. Above Washington the limiting depth is
4 feet to a point 2 miles below Greenville, thence 1 foot to the mouth
of Fishing Creek. The cost of the work under the existing project
to June 30, 1934, was $426,100.39 for new work and $249,041.31 for
maintenance, a total of $675,141.70.          The expenditures were
$674,880.53.
  Proposed operations.-The balance unexpended July 1, 1934,
$14,432.79, will be applied as follows:
Maintenance :
   Dredging 50,000 cubic yards of material from the channel at
      and below Washington under contract (April 1935)         $10, 000. 00                        -______
   Operating the Government derrickboat Contentnea between
      Washington and Tarboro, 49 miles above, about 3 months
           (August 1934, and May, and June 1935) ___________------                                                   4, 432. 79

             Total for all work____                 ________            ________________                  _         14, 432. 79
  The additional sum of $17,000 can be profitably expended during
the fiscal year ending June 30, 1936, and will be applied as follows:
Maintenance:
    Dredging 60,000 cubic yards of material from the channel at
      and below Washington under contract (April 1936) __------ $12, 000.00
    Operating the Government derrickboat Contentnea between
      Washington and Tarboro, 49 miles above, about 3 months
      (January, February, and March 1936)              ____       5, 000. 00

             Total for all work_____ .___________------_---------                                                   17, 000.00

                                    Cost and financial summnary

Cost of new work to June 30, 1934_______________________________ 441, 100. 39
Cost of maintenance to June 30, 1934______________________      _ 249, 041. 31
      Total cost of permanent work to June 30, 1934______________ 690, 141. 70
Value of plant, materials, etc., on hand June 30, 1934____________  -- 261. 17
           Net total cost to June 30, 1934____________________________ 689, 880. 53

Net total expenditures____________________________                                                             689, 880. 53
Unexpended balance June 30, 1934 ________________                                       _________               14, 432. 79

           Total amount appropriated to June 30, 1934______________ 704, 313. 32

           Fiscal year ending June 30                 1930              1931           1932             1933              1934


Cost
Cn$ of new work ...
Cost of maintenance__
                                                    _________
                                                    $6, 238. 26
                                                                2.   $83 177. 92
                                                                       4, 590. 02
                                                                                    $56, 241. 74
                                                                                      5, 872. 90
                                                                                                    $    73.
                                                                                                    $2, 734. 97
                                                                                                               97   .      .
                                                                                                                        $17, 698. 42
     Total cost                         -            6, 238. 26       87, 767. 94    62, 114. 64     2, 734. 97          17, 698. 42
Total expended_________________         _____-       5, 684. 80       48, 214. 42   102, 221. 62     2, 734. 97          17, 437. 25
Allotted     -_
             _-     _-_________             _____    2, 000. 00      123, 000. 00    16, 500. 00     3, 315. 94          30, 909. 91
360       REPORT OF CHIEF OF ENGINEERS,                  U.   S. ARMY,     1934

Balance unexpended July 1, 1933 .----- ----             __----_----_               $960. 13
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934----------------------- $12, 500.00
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933-------------------------- 18, 600. 00
                                                                                31, 100. 00

     Amount to be accounted for-----------------------------32, 060. 13
Deductions on account of revocation of impounded funds---------- 190. 09

      Net amount to be accounted for---------------------------                 31, 870. 04
Gross amount expended_----------------------------------------                  17,437. 25

       Balance unexpended June 30, 1934-------------------              ------ 14, 432. 79

Amount that can be profitably expended in - - fiscal             year ending
                                                          --- ----- -- - -- ---
                                 - - - - - - - - - - -- -
June 30, 1936, for maintenance 1                                               17, 000. 00'

                              6. SOUTH RIVER, N. C.

   Location.-This stream rises in Beaufort County, N. C., and flows
in a general northeasterly direction for 13 miles, emptying into
Pamlico River about 12 miles above its mouth. (See U. S. Coast
and Geodetic Survey Chart No. 537.)
   Existing project.-This provides for a dredged channel 7 feet
deep and 100 feet wide at mean low water, with necessary widening
at channel bends, from the head of the 7-foot channel to the town
of Aurora; thence 7 feet deep and 50 feet wide at mean low water
to Royal; thence 7 feet deep and 35 feet wide at mean low water to
Idalia, with increased width on curves. The length of section under
improvement is about 4 miles, the lower end being about 61/2 miles
from the mouth. This is a nontidal stream, and the variations in the
water surface due to winds seldom exceed 1 or 2 feet above or below
mean stage. From observations covering a period of 4 years, the
extreme range of the wind tides is 8.3 feet. The estimate of cost for
new work, made in 1912, was $22,092.20. The latest (1912) approved
estimate for annual cost of maintenance is $1,300.
   The existing project was authorized by the following river and
harbor acts: The act of June 25, 1910, provided for the section below
Aurora (H. Doc. No. 954, 60th Cong. 1st sess.) ; and the act of March
4, 1913, provided for the sections above Aurora (H. Doc. No. 1095,
62d Cong., 3d sess.). The latest published map is in the last-men-
tioned document.
   Local cooperation.-None.
   Terminal falcilities.-The wharves on the portion of the river
under improvement number 5, of which 2 are below Aurora, and 3
at Aurora. All are private and generally open to all water carriers
free of charge. The existing facilities are considered adequate for
the present commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal yeas.-The project was completed in
1913 at $9,640 under the estimated cost. At the close of the fiscal year
the controlling mean low water depth between the mouth and Aurora
was 5 feet. The cost and expenditures were $12,452.02 for new
work and $3,118.98 for maintenance, a total of $15,571.
  1Exclusive of available funds.
              RIVERS AND HARBORS-WILMINGTON,                         N.   C.,   DISTRICT       361

   Proposed operations.-The balance unexpended July 1, 1934,
$15,000, will be applied to maintaining the channel between a point
81/2 miles above the mouth and the town of Aurora, 11 miles above the
mouth, under contract, during September and October 1934.
   No work is proposed during the fiscal year ending June 30, 1936,
as it is believed that no maintenance dredging will be required.
                                    Cost and financial summary
Cost of new work to June 30, 1934----------------------------                            $12, 452.02
Cost of maintenance to June 30, 1934--------------------------                             3, 118. 98

           Total cost of permanent work to June 30, 1934--------------                    15, 571. 00

Net total expenditures----       ------------------------        15. 571. 00
Unexpended balance June 30, 1934-------------------------------15, 000. 00
           Total amount appropriated to June 30. 1934----------------                     30, 571.00

           Fiscal year ending June 30       1   1930       1931       1932        1933        1934


                 ...------------
Cost of new work--------
Cost of maintenance--------------------------------
            ..--.....--
Total expended                                                                                 $15, 000
Allotted                    ------------ ------------ ------------ -----------------------     $15, 000


Amount allotted from War Department Appropriation Act approved
  Apr. 26, 1934-             ----                                                            $15,000
Balance unexpended June 30, 1934---------------------------------                             15, 000
                                7. SILVER LAKE HARBOR, N. C.

   Location.-Silver Lake Harbor is located at the westerly end of
Ocracoke Island, which is a portion of the barrier separating Pam-
lico Sound from the Atlantic Ocean. Beaufort Harbor lies about
50 miles southwest, Belhaven is about 60 miles northwest. (See
U. S. Coast and Geodetic Survey Chart No. 1232.)
   Existing projeet.-This provides for a channel 5 feet deep at
mean low water and 50 feet wide, extending from that depth in the
sound to the 3-foot contour in Silver Lake Harbor, together with a
training wall 300 feet long to protect the outer end of the entrance
channel from northeast storms. The ordinary range of tide within
the lake is about I foot, with about 21/2 feet at the outer end of the
connecting channel. Severe storm tides have been known to raise
the water surface of the lake as much as 5 feet.
   The estimate of cost for new work, made in 1927, was $11,000.
The latest (1927) approved estimate for annual cost of maintenance
is $900.
   The project was authorized by the River and Harbor Act ap-
proved July 3, 1930 (Rivers and Harbors Committee Doc. No. 3,
70th Cong., 1st sess.). The latest published map is contained in this
document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are three small wharves extending
from the shore to the deeper waters in the lake, and one at the outer
entrance of the channel. While poorly constructed, and few in
number, they are considered adequate for the existing commerce.
362         REPORT       OF CHIEF OF          ENGINEERS, U.             S.   ARMY,         1934


   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The project was completed in
June 1931. At the close of the fiscal year the project depth of 5
feet at mean low water was available in the entrance channel and
the training wall was in fair condition. The cost and expenditures
were $11,000 for new work and $700 for maintenance, a total of
$11,700.
   Proposed operations.-No funds are on hand and no work is
proposed during the fiscal year ending June 30, 1935.
   The sum of $1,800 can be profitably expended during the fiscal
year ending June 30, 1936, and will be applied to the maintenance of
the channel, under contract, during August 1935.
                                     Cost and financial summary
Cost of new work to June 30, 1934 _--------                                                               $11, 000
Cost and maintenance to June 30, 1934__----                                                                    700

      Total cost of permanent work to June 30, 1934--------------                                              11, 700
Net total expenditures-----------------------------------                                                      11, 700
Total amount appropriated to June 30, 1934__                                                                   11, 700

            Fiscal year ending June 30              1930     1931            1932          1933                1934


Cost of new work__                                           $11, 000                      ..-
                                                                                    ...---------
Cost of maintenance--                         ----------------------------------                   $700             --
Total expended--       --   -- --
                               _ - --        -      ---       11, 000 ------                        700        --
A 'otted-                                    -11,                000
                                                                 0-----                             700   ..        ..


Amount that can be profitably expended in fiscal year ending June 30,
1836, for maintenance    -------------------------------------- $1, 800

                                         8. NEUSE RIVER, N. C.

   Location.-Rises in the northerly part of North Carolina and
flows in a southeasterly direction until it reaches Kinston; thence
northeast to mouth of Contentnea Creek; thence southeast to a point
20 miles below New Bern; thence northeast until it flows into Pam-
lico Sound. Its total length is about 300 miles. (See U. S. Coast
and Geodetic Survey Chart No. 538.)
   Existing project.-This provides for a channel 300 feet wide and
12 feet deep at mean low water up to and in front of New Bern; 4
feet deep at dead low water to Kinston, and during 9 months of the
year 3 feet deep at dead low water to Smithfield, to be obtained by
dredging and snagging. Length of the section included in the proj-
ect, about 184 miles. The stream is nontidal; variations in the
water surface at and below New Bern, due to prevailing winds,
seldom exceed 2 feet above or below mean stage. The extreme range
of flood or freshet stage for the upper section of the river is 21 feet
at Selma. Tide-gage readings at New Bern covering 4 years show
the extreme range of wind tides to be 8.3 feet. The estimate of
cost for new work, revised in 1927, is $417,200. The latest (1928)
approved estimate for annual cost of maintenance is $12,500.
   The project was authorized by the following river and harbor
acts: The act of June 18, 1878, as extended in 1879, provided for the
        RIVERS AND HARBORS-WILMINGTON,                          N.   C.Y DISTRICT     363
portion of the river above New Bern (Annual Report for 1872, pp.
734-741, and Annual Report for 1879, pp. 708-710) ; the act of June
13, 1902, provided for a depth of 8 feet at dead low water at and
below New Bern (H. Doc. No. 317, 54th Cong., 2d sess.), and the
act of January 21, 1927, provided for a depth of 12 feet (H. Doc.
No. 299, 67th Cong., 2d sess.). The latest published map is in the
Annual Report for 1889, page 1058.
  Local cooperation.-Fullycomplied with.
   Terminal facilities.-There are 49 wharves on this stream, of
which 9 are below New Bern, 28 at or near New Bern, 8 at Bridgeton,
and 4 above New Bern. They have a total frontage of about 4,200
feet. Existing facilities are considered adequate for present needs.
   Operations and results during fiscal year.-The work consisted
of snagging with Government plant and hired labor. The derrick
boat Contentnea worked between New Bern and a point 27 miles
above, clearing the channel between these points. The cost and ex-
penditures were $2,794.99, all for maintenance.
  Condition at end of fiscal year.-The project is completed to the
practical limit. Due to the fact that it is impracticable to obtain
and maintain the project depth above New Bern by dredging and
snagging, the percentage of completion is uncertain. At the close
of the year a channel 300 feet wide and 12 feet deep at mean low
water existed from the mouth to New Bern, with the exception of
Fort Point Channel, which had a controlling depth of 11 feet.
From New Bern to a point 23 miles above, the controlling depth
was 4 feet; thence 21/2 feet to the mouth of Contentnea Creek, 32
miles above New Bern; thence 1 foot to Seven Springs, 75 miles
above New Bern. The channel above New Bern is about 50 feet
wide. The cost and expenditures were $403,066.04 for new work and
$185,009.31 for maintenance, a total of $588,075.35.
  Proposed operations.-The balance unexpended July 1, 1934,
$14,449.97 will be applied as follows:
Maintenance:
    Dredging channel at and below New Bern under contract
      (January 1935)-----------------------------------------    $10, 000.00
   Operating the Government derrick boat Contentnea between
      New Bern and Seven Springs, 75 miles above, about 3 months
      (September 1934 and February and March 1935) .......         4,449.97
        Total for all work--------------------------------___                   14, 449.97
  The additional sum of $12,500 can be profitably expended during
the fiscal year ending June 30, 1936, and will be applied as follows:
Maintenance :
    Dredging channel at and below New Bern under contract (Janu-
      ary 1936)-------------------------------------------------- $9,500
    Operating the Government derrick boat Contentnea between New
      Bern and Seven Springs, about 2 months (August and Sep-
        tember 1935)-----------------------------------            3,000
                            --------------------------------------
          Total for all work_                                                       12, 500
364           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

                                           Cost and financial summary
Cost of new work to June 30, 1934__________________________   $403, 066. 04
Cost of maintenance to June 30, 1934------------------------- 185, 009. 31
         Total cost of permanent work to June 30, 1934 ------------                                        588, 075. 35
Net total expenditures  ------------------------------------ 588, 075. 35
Unexpended balance June 30, 1934----------------------------14, 449. 97
         Total amount appropriated to June 30, 1934-------------- 602, 525. 32


        Fiscal year ending June 30                      1930          1931           1932          1933           1934

Cost of new work
Cost of maintenance----    -       -             -    $1, 931. 48   $2, 706. 58    $2, 658. 79   $2, 450. 53     $2, 794. 99
Total expended_    __---       -       -   _    ---    1, 931. 48   2, 706. 58      2, 658. 79   2, 450. 53       2, 794. 99
Allotted---     ---------------------------              500. 00 ---------        - 6,500. 00     3, 272. 57     15, 446.75


Balance unexpended July 1, 1933----------------------------                 $1, 798.21
Amount allotted from War Department Appropriation Act
  approved Apr. 26, 1934------------------------------- $3, 500. 00
Amount allotted from War Department Appropriation Act
  approved Mar. 4, 1933-------------------             -------- 13, 500. 00
                                                                            17, 000. 00

     Amount        to be accounted for--1--------------------------8,                                            798. 21
Deductions on      account of:
   Revocation       of allotment------------------------              1, 400. 00
   Revocation       of impounded funds--------------------153.25
                                                                                                               1, 553.25

      Net amount to be accounted for------------------------17,                                                   244. 96
Gross amount expended --------------------------                                                               2, 794.99

        Balance unexpended June 30, 1934---------------- ------- 14, 449. 97

Amount that can be profitably expended in fiscal         year ending June 30,
                        1 - -- -- - -- -- -- - -- -- - -- -- -- -- - -- --    12, 500.00
1936, for maintenance ______________
                                               9. SWIFT CREEK, N. C.

   Location.-Swift Creek has its source in the swamps of Pitt
County, about 5 miles south of Greenville, N. C. It flows south-
easterly 43 miles and empties into Neuse River 71/ miles above New
Bern, N. C. (See U. S. Geological Survey sheets New Bern, Vance-
boro, Ayden, and Winterville.)
   Existing project.-This provides for clearing the channel from the
mouth to Vanceboro, 12 miles, of snags and overhanging and leaning
trees. The rise of water level, due to prevailing winds and floods,
reaches its maximum height at Vanceboro of about 12 feet. The
estimate of cost of new work, made in 1909, was $1,600. The latest
 (1928) approved estimate for annual cost of maintenance is $350.
   The existing project was adopted by the River and Harbor Act of
June 25, 1910 (H. Doc. No. 360, 61st Cong., 2d sess.). No map of
this creek has ever been published.
   Terminal facilities.-There are 8 wharves on this stream, of which
5 are at Vanceboro. They have a total frontage of about 240 feet.
   1Exclusive of available funds.
             RIVERS AND HARBORS-WILMINGTON,                                 N.     C., DISTRICT     365
The existing facilities are considered adequate for the present
,commerce.
    Operations and results during fiscal year.-None.
    Condition at end of fiscal year.-The project was completed in
1910. A channel 5 feet deep at mean low water, with a minimum
width of 50 feet, was available at the end of the year to Vanceboro.
The cost and expenditures were $1,600 for new work and $5,422 for
maintenance, a total of $7,022.
   Proposed operations.--The balance unexpended July 1, 1934, $350,
will be applied to maintenance snagging between the mouth and
Vanceboro, 12 miles above, with the Government derrick boat Con-
tentnea during October 1934.
    The additional sum of $350 can be profitably expended during the
fiscal year ending June 30, 1936, and will be applied to mainte-
nance snagging between the mouth and Vanceboro, with the Govern-
  nent derrick boat Contentnea during October 1935.
                                   Cost and financial summary

Cost of new work to June 30, 1934---------------------------------$1, 600
Cost of maintenance to June 30, 1934------------------------------- 5,422

          Total cost of permanent work to June 30, 1934------------------                         7, 022

Net total expenditures ------------------------                                                    7, 022
Unexpended balance June 30, 1934-----------------------------------                                   350

          Total amount appropriated to June 30, 1934__                                            7, 372

          Fiscal year ending June 30         1930               1931         1932          1933   1934

Cost of new work .        ----------------
Cost of maintenance.....----------------------          ..      $496. 67     $203.33

                         --------------------..
Total expended--.......--------                                   496. 67        203. 33
        ----.--------------------
Allotted,..                                 $700.00 ----------- ----------- -------               $350.00


Amount allotted from War Department Appropriation Act approved Apr.
26, 19,34                                                            $350
Balance unexpended June 30, 1934-------------------------------------350

Amount that can be profitably expended in fiscal year ending June 30,
  1936,     for maintenance                         -----------------                                350

                              10. CONTENTNEA CREEK, N. C.

   Location.-Rises in Wilson County, N. C., flows in a general south-
,easterly direction, and empties into Neuse River about 32 miles above
New Bern, N. C. (See U. S. Geological Survey sheets Ayden, Falk-
land, Kinston, and Wilson.)
   Existing project.-This provides for clearing the stream of ob-
:structions so as to obtain from its mouth to Stantonsburg a depth
of not less than 3 feet during the higher stages about 9 months
of the year. The section under improvement is from the mouth to
:Stantonaburg, 63 miles. The stream is subject to freshets, rising 11
  SExclusive of available funds.
366         REPORT         OF CHIEF OF             ENGINEERS, U.           S. ARMY,          1934

feet above low water at Snow Hill and Stantonsburg, 32 and 63 miles
above the mouth, respectively. Boating stages are generally avail-
able from January to June and intermittently during the remainder
of the year. The estimate of cost for new work, made in 1887, was
$77,500. The latest (1928) approved estimate for annual cost of
maintenance is $1,000.
   This project was adopted by the River and Harbor Act of March
3, 1881 (H. Doc. No. 85, 46th Cong., 3d sess., and Annual Report for
1881, p. 1010). The latest published map is on page 1014 of the
Annual Report for 1887.
   Recommended modifications of project. The abandonment of this
improvement above Snow Hill, N. C., is recommended in House
Document No. 467, Sixty-ninth Congress, first session.
   Terminal facilities.-There is one wharf on this stream. The ex-
isting facilities are considered adequate for the present commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.--The existing project was com-
pleted in 1896 at a saving of $13,105 under the estimated cost. The
stream was not snagged during the year due to the fact that a shoal
at the mouth prevented the derrick boat Contentnea from entering
the stream during the low stage of water that prevailed while it
was operating in that vicinity. At present the stream is in poor con-
dition. The cost and expenditures have been $64,394.56 for new
work and $31,847.15 for maintenance, a total of $96,241.71.
  Proposed operations.-The balance unexpended July 1, 1934,
$2,416.29, will be applied to maintenance snagging between the
mouth and Snow Hill, 32 miles above, with the Government derrick-
boat Contentnea, during November and December 1934.
   The additional sum of $1,000 can be profitably expended during
the fiscal year ending June 30, 1936, and will be applied to mainte-
nance snagging between the mouth and Snow Hill, with the Govern-
ment derrick boat Contentnea, during May 1936.
                                     Cost and financial summary

Cost of new work to June 30, 1934_______________________________                                  $64, 394. 56
Cost of maintenance to June 30, 1934___________________________                                    31, 847. 15

         Total cost of permanent work to June 30, 1934___________                                    96, 241. 71

Net total expenditures____________---        ----                                                    96, 241. 71
Unexpended balance June 30, 1934_____________________________                                         2, 416. 29

         Total amount appropriated to June 30, 1934______________                                    98, 658. 00


         Fiscal year ending June 30                 1930        1931         1932          1933          1934

Cost ofnew work--------------------------I      --------
                    --------------------
Cost of maintenance...                     $454. 20   $495. 04              $434.47    --------
Total expended-------------------------             454. 20      495. 04     434.47
Allotted----..........--------------------------   1,000. 00   1,000. 00 -1, 000. 00    $1,000. 00           00
                                                                                                        $1,000o.
         RIVERS AND IHARBORS-WILMINGTON,               N. C., DISTRICT        367
Balance unexpended July 1, 1933     ----   --   ---       ------        $1, 416. 29
Amount allotted from War Department Appropriation Act approved
Mar. 4, 1933----------   ----------------------------------             1, 000. 00

      Amount to be accounted for _____                                   2, 416. 29

Balance unexpended June 30, 1934_ ___                                    2, 416. 29

Amount that can be profitably expended in fiscal year ending June 30,
1936, for maintenance 1----------------------------------------         1, 000. 00

                              11. TRENT RIVER, N. C.

   Location.-This stream is formed by the junction of Beaver Dam
and Tuckahoe Creeks, in Jones County, N. C. It flows for 80 miles
(about 40 miles in an air line) in an easterly direction through Jones
and Craven Counties, and at New Bern empties into the Neuse River,
being its principal tributary. (See U. S. Geological Survey sheets,
New Bern and Trent River.)
   Previous projects.-Adopted by the act approved March 3, 1879.
The cost and expenditures on all the above projects were $70,905.40
for new work and $27,104.99 for maintenance, making a total of
$98,010.39. For further details see page 1803 of the Annual Report
for 1915.
   Existing project.-This provides for a channel 12 feet deep at
mean low water and 300 feet wide in front of New Bern, a channel
of 6 feet depth at dead low water over Foys Flats, and a channel 50
feet wide and 4 feet deep at low water to Trenton. The length of
section included in the project is 38 miles. Near the mouth the
water level varies about 2 feet under normal conditions, according
to prevailing winds. Observations covering a period of 4 years
show that the extreme range of wind tides is 8.3 feet.
   The estimate of cost for new work, revised in 1927, was $41,600,
exclusive of amounts expended on previous projects. The latest
 (1927) approved estimate for annual cost of maintenance is $2,100.
   The existing project was authorized by the following river and
harbor acts: The act of June 13, 1902, provided for a depth of 8 feet
at dead low water at New Bern (H. Doc. No. 121, 56th Cong., 2d
sess.); Joint Resolution No. 22, approved March 4, 1907, covered the
section at Foys Flats; the act of June 25, 1910, provided for the work
in the upper section of the river (H. Doc. No. 1471, 60th Cong., 2d
sess.); and the act of January 21, 1927, provided for increasing the
depth of New Bern to 12 feet at mean low water (H. Doc. No. 299,
67th Cong., 2d sess.). For latest printed map see page 1318 of the
Annual Report for 1895.
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are 52 wharves on the portion of this
stream under improvement, of which 32 are at or opposite New Bern,
5 are at or near Polloksville, and 3 are at Trenton. They have a
total frontage of about 7,650 feet. The existing facilities are con-
sidered adequate.
   Operations and results during fscal year.-The work consisted
of snagging with Government plant and hired labor. The derrick
boat Contentnea operated between New Bern and Trenton, a dis-
  1 Exclusive of available funds.
      91536-ENG 1934-----24
368            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

tance of 38 miles, clearing the channel between these points. The
total cost and expenditures were $1,977.32, all for maintenance.
   Condition at end of flsccd year.-The project was completed in
1929. At the end of the year project dimensions existed to Polloks-
ville, 18 miles above the mouth. From Polloksville to Trenton the
controlling depth is 31/2 feet. The cost and expenditures under the
existing project to June 30, 1934, have been $44,294.05 for new work
and $31,181.78 for maintenance, a total of $75,475.83.
   Proposed operations.-The balance unexpended July 1, 1934,
$2,601.99, will be applied to maintenance snagging between the mouth
and Trenton, 38 miles above, with the Government derrick boat
Contentnea during October 1934 and April 1935.
   The additional sum of $2,100 can be profitably expended during
the fiscal year ending June 30, 1936, and will be applied to mainte-
nance snagging between the mouth and Trenton, with the Gov-
ernment derrick boat Contentnea., during October 1935 and April
1936.
                                           Cost and financial summary
Cost of new work to June 30, 1934----------------------------- $115, 199. 45
Cost of maintenance to June 30, 1934 -------------------------   58, 286. 77

           Total cost of permanent work to June 30, 1934-------------                                             173, 486. 22

Net total expenditures------------------------------------ 173, 486. 22
Unexpended balance June 30, 1934------------------------------ 2, 601. 99

           Total amount appropriated to June 30, 1934---------------- 176, 088. 21


          Fiscal year ending June 30                            1930         1931           1932           1933          1934

Cost of new work ..------------------------------------------
Cost of maintenance             ------------------ $549. 33                $1, 654. 10      $936. 17----               $1, 977. 32
Total expended------..........-----------                        549. 33    1,654. 10        936. 17                     1,977. 32
Allotted--o-------              ----------------            2, 600. 00      2, 000. 00   -1, 000. 00   $1, 000. 00       3, 009.   i




Balance unexpended July 1, 1933----------------------------- $1, 570. 15
Amount allotted from War Department Appropriation Act
  approved Apr. 26, 1934 ----   -------------------- $2, 400. 00
Amount allotted from War Department Appropriation Act
  approved Mar. 4, 1933----------------------------1, 000. 00
                                                                 3, 400. 00

     Amount to be accounted for ----------------------------                                                         4, 970. 15
Deductions on account of-
   Revocation of allotment--------------------------     300. 00
   Revocation of impounded funds---------------------     90. 84
                                                                                                                        390. 84
      Net amount to be accounted for-------------------------4,                                                         579. 31
Gross amount expended                                                                                                1977.     32
                                                                                                                     1,--------------------------

          Balance unexpended June 30, 1934                                 ----------------------- 2, 601.99
Amount that can be profitably expended in fiscal year ending June 30,
1936, for maintenance -__     --       ------------------ ___                                                       2, 100. 00
   1Exclusive of available funds.
               RIVERS AND HARBORS-WILMINGTON,                                                       N.          C., DISTRICT               369

    12. CHANNEL CONNECTING THOROUGHFARE BAY WITH CEDAR
                                                            BAY, N. C.

   Location.-ThoroughfareBay is on the north side of Core Sound,
about 6 miles west of the end of the peninsula at the junction of
Core and Pamlico Sounds. It lies about 30 miles by the boat route
through Core Sound easterly from Beaufort, N. C. (See U. S. Coast
and Geodetic Survey Chart No. 1233.)
   Existing project. This provides for a channel 5 feet deep and 50
feet wide on bottom to connect Thoroughfare Bay and Cedar Bay.
The length of this channel is about 11/2 miles. There is no lunar tide
in the channel or waterway, variations in the level of the water sur-
face being due entirely to the action of the wind. Ordinary storms
will cause a variation of 1 foot above or below the mean stage, while
severe storms may cause a variation of as much as 3 feet. The esti-
mate of cost for new work, revised in 1919, was $9,000. The latest
 (1928) approved estimate for annual cost of maintenance is $1,000.
   The existing project was adopted by the River and Harbor Act of
March 2, 1919. (H. Doc. No. 1125, 63d Cong., 2d sess.). The latest
published map is in the project document.
   Terminal facilities.-There are no wharves on the waterway, and,
as it is only a part of a through waterway, none are deemed necessary.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The project was completed in
1921. At the close of the fiscal year the governing low water depth
was 41/2 feet. The cost and expenditures have been $9,000 for new
work and $8,000 for maintenance, a total of $17,000.
   Proposed operations.-The balance unexpended July 1, 1934,
$5,000, will be applied to maintenance dredging in the waterway by
removing about 25,000 cubic yards of material under contract, dur-
ing February 1935.
   No work is proposed during the fiscal year ending June 30, 1936,
as it is believed that no maintenance dredging will be required.
                                         Cost and financial summary

Cost of new work to June 30, 1934    ---------------------------                                                                    $9, 000. 00
Cost of maintenance to June 30, 1934__--_____---------------                                                                         8, 000. 00

           Total cost of permanent work to June 30, 1934___-----__                                                                   17,000. 00

Net total expenditures ----------------------------                                                                                 17, 000. 00
Unexpended balance June 30, 1934----------------------------                                                                         5,000. 00

           Total amount appropriated to June 30, 1934-                                             -- __-         ------          _ 22, 000. 00

           Fiscal year ending June 30                        1930               1931                  1932                 1933         1934


Cost of new work-----.....--          -------------------
Cost of maintenance...---                  ------------             -----------------------------------------

Total expended...-----------------------                               ----------------------------------------
Allotted              ...---------------------------      -$4, 000. 00 -----------------------                                --       $5, 000. 00


Amount allotted from War Department Appropriation Act approved
  Apr. 26, 1934__                 -------------------------------- $5, 000
Balance unexpended June 30, 1934_              _ - ____-            5, 000
370    REPORT   OF CHIEF OF    ENGINEERS, U.   S.   ARMY,   1934

                    13. BEAUFORT HARBOR, N. C.

   Location.--This harbor is located just inside Beaufort Inlet and
extends to the Norfolk Southern Railroad bridge across Newport
River. It is about 1/ miles square and lies between Core and
Bogue Sounds. (See U. S. Coast and Geodetic Survey Chart No..
420.)
   Previous projects.-Adopted. by the act of July 4, 1836. The cost
and expenditures were $5,000, all for new work. For further de-
tails see page 1803 of Annual Report for 1915.
   Existing project.-This provides for the stopping of erosion at
the inlet by jetties and sand fences at Fort Macon and Shackleford
Points and other shore protection; for a channel 100 feet wide and
12 feet deep at mean low water in Bulkhead Channel and Gallants
Channel and the same depth with width varying from 200 to 400
feet in front of the town of Beaufort; and the construction of a
stone bulkhead extending from Town Marsh across Bird Shoal to
the westerly end of Carrot Island. The distance from the inlet to
the upper end of Gallants Channel is about 5 miles. The average
rise of tide is 21/2 feet at Beaufort and 31/2 feet at the inlet. As
shown by observations made in 1907, the extreme range, of tides is
4.8 feet.
   The estimate of cost for new work, revised in 1930, exclusive, of
amount expended on previous projects, is $262,800. The latest
 (1930) approved estimate for annual cost of maintenance, is $17,500.
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1881, provided for the erection of
jetties and the securing of a 9-foot channel (Annual Report for 1881,
p. 1013), as amended in 1890 (Annual Report for 1890, p. 1134), to
provide for a 7-foot channel to Beaufort; the act of March 2, 1907,
authorized repairs to existing jetties at Fort Macon Point and addi-
tional jetties and shore protection; the act of June 25, 1910, provided
for the 10-foot channel to the inland waterway and the turning basin
at Beaufort (H. Doc. No. 511, 61st Cong., 2d sess.) ; the act of March
2, 1919, provided for an enlargement of the turning basin (H. Doc.
No. 1108, 63d Cong., 2d sess.); the act of March 3, 1925, authorized
the bulkhead across Bird Shoal (Rivers and Harbors Committee Doc.
No. 8, 68th Cong., 2d sess.); and the act of July 3, 1930, authorized
an increased depth in Bulkhead and Gallants Channels and in front
of the town of Beaufort to 12 feet (H. Doc. No. 776, 69th Cong., 2d
sess.). The latest published map is in the last-mentioned document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are 48 wharves contiguous to this har-
bor. They have a total frontage of about 1,400 feet. The existing
facilities are considered adequate for the present commerce. For
further details see page 550, Annual Report for 1932.
   Operationsand results during fiscal year.-The work for the year
consisted of maintenance dredging under contract. The contractor
removed 24,097 cubic yards of material from Bulkhead Channel,
which resulted in restoring the channel to project dimensions. The
cost was $6,000.75, all for maintenance. The total expenditures for
the year were minus $23,703.28.
   Condition at end of fiscal year.-The project was completed in
July 1931. At the end of the fiscal year the project depth of 12 feet
            RIVERS AND HARBORS                     WILMINGTON, N. C., DISTRICT                                  371
existed and the stone jetties and training walls were in fair condi-
tion.      The total cost of existing project to June 30, 1934, was $269,-
667.38 for new work and $162,831.66 for maintenance,                                                a total of
$432,499.04. The total expenditures were $432,445.49.
  Proposed operations.-The balance unexpended July 1,                                                          1934,
$16,931.84, will be applied as follows:
Accounts payable July 1, 1934 __________-             _
                                                    -__                    $97. 85
Maintenance:
    Dredging about 50,000 cubic yards of material from the chan-
      nels under contract (February 1935) _-                           10, 000. 00
    Placing 1,000 tons of stone on existing jetties and training walls
      under contract (April and May 1935)                               6, 833. 99

         Total for all work---------------------------------------16, 931. 84
  The additional sum of $17,500 can be profitably expended during
the fiscal year ending June 30, 1936, and will be applied as follows:
Maintenance :
    Dredging about 60,000 cubic                 yards of material from channels
      under contract (November                   and December 1935)------------ $12, 000. 00
    Placing 800 tons of stone on                existing jetties and training walls
      under contract (April and                 May 1936) ----------------------    5, 500. 00

         Total for all work                                                                               7, 500. 00
                                                                                                         1----------------------------

                                 Cost and financial summary
Cost of new work to June 30, 1934-          ___                                                        $274, 667. 38
Cost of maintenance to June 30, 1934__-----------                                                       162, 831. 66

      Total cost of permanent work to June 30, 1934-------------                                        437, 499. 04
Value of plant, materials, etc., on hand June 30, 1934------------                                            44. 30

      Net total cost to June 30, 1934------------------------                                 _         437, 543. 34
Minus accounts payable June 30, 1934----------                                                                 97. 85

        Net total expenditures____                                                                      437, 445.49
Unexpended balance June 30, 19,34                                          -------                       16, 931. 84

         Total amount appropriated to June 30, 1934-                        --       -   ___-           454, 377. 33


   Fiscal year ending June 30            1930         1931                1932            1933               1934


'Cost of new work _--                               $47, 208. 02    $13, 454. 58
'Cost of maintenance    -          $11, 343. 37       5, 171. 77      3, 258. 22         $2, 943. 10         $6, 000. 75
      Total cost..... ....-...      11, 343. 37      52, 379. 79     16, 712. 80          2,943.10            6, 000. 75
'Total expended -- -        -    -107,    868.25     25, 909. 53     16, 036. 89          4, 227. 48'     -23, 703. 28
Allotted---------.------         -117, 798. 68       56, 395. 00   -23,    500. 00        1,066.90        -10,605.84
                                                                                         __
Balance unexpended July 1, 1933__________                        $3, 834. 40
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934___--_________________ $14, 500. 00
Amount allotted from War Department Appropriation
  Act .approved Mar. 4, 1933                            000. 00
                                                    1_____________-______---12,
                                                                 26.
                                                                 Amount
                                                                       500.
                                                                   tobeaccounted
                                                                                00
                                                                                40
                                                                       334. for-30,


        Amount to be accounted for___                                                                   -30,334.40
372      REPORT OF CHIEF OF ENGINEERS,                 U.   S. ARMY,     1934

Deductions on account of:
   Revocation of allotment---------------------               $37, 089. 73
   Revocation of impounded funds----------                          16. 11
                                                                              $37, 105. 84
      Net amount to be accounted for---------------------                     -6,    771. 44
Gross amount expended       --------------------------          7, 425.20
Less:
    Reimbursements collected --------------            $38. 75
    Receipts from sales ------------------ 31, 089. 73
                                                               31, 128. 48
                                                                             S-23,   703. 28

      Balance unexpended June 30, 1934.------                     16, 931. 84
Outstanding liabilities June 30, 1934----------------------------      97. 85

      Balance available June 30, 1934--------------------------                16, 833.99

Amount that can be profitably expended in fiscal year ending June
30, 1936 for maintenance 1--------------------------------                    17, 500. 00

  14. WATERWAY         CONNECTING PAMLICO SOUND AND BEAUFORT
                              HARBOR, N. C.

   Location.-This waterway begins at the southeast corner of Pam-
lico Sound, passing southwesterly through Wainright Slue, Core
Sound, The Straits, and Taylors Creek to Beaufort Harbor, a total
length of 36.5 miles. (See U. S. Coast and Geodetic Survey Chart
No. 1233.)
   Previous projects.-No previous project exists for this waterway
as a whole. The River and Harbor Act of March 4, 1913, authorized
a channel connecting Core Sound' and Beaufort Harbor. The cost
and expenditures prior to the adoption of the existing project in 1922
were $20,000 for new work and $12,853.81 for maintenance, a total
of $32,853.81. In addition $10,000 contributed by local interests was
expended on new work.
   Eisting project.-This provides for a channel 7 feet deep at mean
low water with bottom width of 75 feet, extending from Pamlico
Sound by way of Core Sound to Beaufort Harbor, a distance of 36.5
miles. There are no lunar tides in the northern portion of Core
Sound. Ordinary storms cause a variation of 1 foot above or below
mean stages, increasing to as much as 3 feet during severe storms.
The mean tidal range at Beaufort is 21/2 feet, gradually diminishing
toward the upper end of Core Sound.
   The estimate of cost for new work, revised in 1932, is $71,400, ex-
clusive of amounts expended on previous projects. The latest (1932)
approved estimate for annual cost of maintenance is $11,000. The
existing project for that portion of the waterway connecting Beau-
fort Harbor and Core Sound was adopted by the River and Harbor
Act of September 22, 1922 (H. Doc. No. 88, 67th Cong., 1st sess.).
   Extension of the waterway to Pamlico Sound via Wainwright
Channel, as recommended by the Chief of Engineers in House Docu-
ment No. 485, Seventy second Congress, second session, was included
1 Exclusive of available funds.
       RIVERS AND HARBORS-WILMINGTON,         N.   C., DISTRICT   373
in the Public Works program under the National Industrial Recov-
ery Act. The latest published maps are contained in the above-
mentioned documents.
   Recommended modifications of project.-Included in the public
works program.
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are five wharves on the portion of the
waterway connecting Core Sound with Beaufort Harbor. They
have a total frontage of about 200 feet. Between the eastern end of
this waterway and Pamlico Sound there is only one small wharf,
which is at Atlantic. All wharves are privately owned, but are gen-
erally open to use by the public when not required by the owners.
The existing facilities on the portion of the waterway connecting
Core Sound and Beaufort Harbor are considered adequate, but addi-
tional wharves are needed at several of the communities along Core
Sound.
            OPERATIONS AND RESULTS DURING FISCAL YEAR


  Project adopted by Congress.-The work consisted of removing
25,277 cubic yards of material from the waterway by contract, result-
ing in restoring project dimensions. The cost was $5,494.72 and the
expenditure $5,444.72, all for ma ntenance.
  Project anuthorized by Federal Emergency Administration of
Public Works.-Work under contract was started May 2 and sus-
pended May 11, as the plant was not suitable for the work. No
portion of the channel was completed and no yardage allowed. The
cost and expenditures were $14.75, all for new work.
                  CONDITION AT END OF FISCAL YEAR


   Project adopted by Congress.-This project was completed in
1923, at a saving of $2,345 under the estimated cost. At the close of
the fiscal year the project depth of 7 feet at mean low water was
available. The costs to June 30, 1934, have been $27,655.04 for new
work and $35,987.87 for maintenance, a total of $63,642.91. The
total expenditures were $63,592.91.
   Project aucthorized by FederalEmergency Adninistration of Pub-
lie Works.-Work on the project has just started. At the close of the
fiscal year the governing mean low-water depth was 234 feet. The
cost and expenditures were $14.75, charged to new work.
   Proposed operations.-The balance on hand July 1, 1934,
$41,385.25, National Industrial Recovery Act funds, will be used in
removing about 166,500 cubic yards of material, from six shoals in
the waterway, under contract, between July 1 and October 31, 1934.
   The additional sum of $11,000 can be profitably expended during
the fiscal year ending June 30, 1936, and will be applied to the main-
tenance of the entire channel, under contract, during May and June
1936.
374          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                            1934

                                     Cost and financial summary

                                MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934__ _______________                                                  $47, 655. 04
Cost of maintenance to June 30, 1934_        _---------------------                                   48, 841. 68

      Total cost of permanent work to June 30, 1934       -                                           96, 496. 72
Value of plant, materials, etc., on hand June 30, 1934 __                                                -50. 00

           Net total cost to June 30, 1934__________________                               ______     96, 446. 72

Net total expenditures -----------
                              _-_____-_                                                               96, 446. 72
Unexpended balance June 30, 1934______________________                                       ___           50. 00

           Total amount appropriated to June 30, 1934_______________                                  96, 496. 72


           Fiscal year ending June 30             1930           1931          1932           1933        1934


Cost ofnew work .
Cost of maintenance                             $1, 870. 50      $726. 75    $9, 473. 25                 $5, 494. 72
Total expended ........................
                                  _              1, 870. 50       726. 75     9, 473. 25      1           5, 444. 72
Allotted_-                                       1, 500. 00   3, 700. 00      1, 500. 00 ............5, 494. 72


Amount allotted from War Department Appropriation Act ap-
proved Mar. 4, 1933------------------------------------------$5, 500. 00
Deductions on account of revocation of impounded funds              5. 28             ----------
      Net amount to be accounted for- -     --
                                         ______                                                  5,494. 72
                                                                                       -__________
Gross amount expended_____ ___-________-________                                                 5, 444. 72

           Balance unexpended June 30, 1934_______________-_____--                                        50. 00

Amount that can be profitably expended in fiscal year ending June
                           -- - -- - -- - -- - --
30, 1936, for maintenance                        -               11,
                                                                  1 000. 00

                                         PUBLIC    WORKS FUNDS


Cost of new work to June 30, 1934________________________________                                          14. 75
Cost of maintenance to June 30, 1934

           Total cost of permanent work to June 30, 1934____________                                      14. 75

Net total expenditures_ ---------------------------------------- 4. 75
Unexpended balance June 30, 1934_____________________________ 41, 385. 25

           Total amount appropriated to June 30, 1934_______________                                 41,400. 00

           Fiscal year ending June 30             1930           1931          1932           1933        1934


Cost of new work------------                             -    ------------                                  $14, 75
Cost ofmaintenance-

Total expended--- -        - -__- -- -      - - --------------                                                14. 75
Allotted     _ . _        . _                 --------------------------
                                 --------------                                   -                      41, 400..00

   1Exclusive     of available funds.
             RIVERS AND HARBORS-WILMINGTON,                                        N. C.y DISTRICT                             375
Amount allotted from National Industrial Recovery Act approved
June 16, 1933___     ___        ___------------------------------------------------ $41, 400. 00
Gross amount expended--------------------------------------                               14. 75

     Balance unexpended June 30, 1934----------------------     41, 385.25
Amount covered by uncompleted contracts------------------------30, 767. 00

          Balance available June 30, 1934- ______________---------                                                       10, 618. 25

CONSOLIDATED        COST AND       FINANCIAL        SUMMARY            FORi PAMLICO                        SOUND-BEAUFORT
                                              HARBOR WATERWAY

Cost of new work to June 30, 1934_ _-                                                                                   $47, 669. 79
Cost of maintenance to June 30, 1934--_____
                                      -----                               --------------                                 48, 841. 68

      Total cost of permanent work to June 30, 1934--------------96, 511. 47
Value of plant, materials, etc., on hand June 30, 1934-----------  -- 50. 00

          Net total cost to June 30, 1934-----------------------                                       __                96, 461. 47
Net total expenditures________________                                                                                   96, 461. 47
Unexpended balance June 30, 1934-------------------------------41,                                                          435. 25

          Total amount appropriated to June 30, 1934                           -             --             __          137, 896. 72


          Fiscal year ending June 30               1930            1931              1932                        1933        1934


Cost of new work ....                                                 _$726.
                                                                         7                                                      $14. 75
Cost of maintenance__                            $1, 870.50                        $9, 473. 25                               5, 494. 72
   Total Co st _-                                                                                                            5, 509.47
                                                                    726. 75
Total expended-                                   1. 870. 50                        9, 473. 25    -        ---               5,459.47

A llotte d .--------
                ------------------------
                                      1, 500. 00                  3, 700. 00        1, 500. 00         -------              46,894. 72



Amount allotted from War Department Appropriation Act approved
   Mar.    4,   1933      _____-        ---    _______                                  --                              $5,500.00
Amount allotted from National Industrial Recovery Act approved
   June 16, 1933-___________                              -______ -__________                                            41,400.00

     Amount to be accounted for------------------------                                                                 46, 900. 00
Deductions on account of revocation of impounded funds-                                               --                      5. 28

      Net amount to be accounted for_----------------------                                                        _     46, 894. 72
Gross amount expended _______________                                                                                     5, 459.47

        Balance        unexpended       June 30,          1934_                        --                        ___     41, 435. 25
Amount covered by uncompleted                     contracts               --                                     __      30, 767. 00

        Balance      available      June 30, 1934_ _----                                                                 10, 668. 25

Amount that can be profitably     expended in fiscal year ending June 30,
                          1- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
1936, for maintenance                                                                         ---- 11, 000. 00

15. INLAND WATERWAY, BEAUFORT, N. C., TO THE CAPE FEAR RIVER
         INCLUDING WATERWAY TO JACKSONVILLE, N. C.

  Location.-This waterway begins at Beaufort Harbor and follows
the general line of the coast, passing through Bogue Sound and the
sounds and marine marshes to the south, to a point in Myrtle Sound
just north of Carolina Beach, crossing the mainland at this point
into Cape Fear River, which it enters about 16 miles below Wilming-
ton. (See U. S. Coast and Geodetic Survey Charts Nos. 1234 and
1235.)
  1 Exclusive of available funds.
376    REPORT OF CHIEF     OF ENGINEERS,    U.   S. ARMY   1934

   Previous projects.-Adopted by acts of July 4, 1836, March 3,
1837, July 7, 1838, August 2, 1882, March 3, 1905, June 25, 1910,
September 19, 1890, August 5, 1886, and August 8, 1917. The cost
and expenditures were $198,706.92 for new work and $107,633.94 for
maintenance, a total of $306,340.86. For further details see page
1803 of Annual Report for 1915, and page 585 (for New River),
page 587 (for waterway between New River and Swansboro), and
page 589 (for waterway between Beaufort Harbor and New River;
that is, portion between Beaufort and Swansboro), Annual Report
for 1917; and Annual Report for 1926, page 533.
   Existing project.-This provides for a waterway 12 feet deep
at mean low water with a bottom width of 90 feet, extending along
the coast, from Beaufort, N. C., to the Cape Fear River, a distance
of 93.5 miles, with such modifications in routing as the Chief of
Engineers may find desirable and economical, and including the
provision of a tidal lock near the Cape Fear end and a highway
bridge in its vicinity. The project also provides for a channel 3
feet deep at mean low water and 40 feet wide in New River to
Jacksonville, N. C., a distance of 23 miles.
   The tidal range varies from 31/2 feet at the inlets to 1 foot at
points 'between. The tidal range for New River varies from 31/2
feet at New River Inlet to 1 foot at the head of the marshes and
:nothing at Tar Landing, 31 miles above. At the Beaufort end of
this waterway the extreme range of tide is 4.8 feet. At the various
inlets between Beaufort Inlet and New River Inlet the extreme
range of tides is probably from 31/2 to 4 feet. At the Cape Fear
River end the mean range is 3.5 feet.
   The estimate of cost for new work, revised in 1930, was $3,800,000,
exclusive of amounts expended on previous projects. The latest
 (1926) approved estimate for annual cost of maintenance is $150,-
000.
   The existing project was adopted by the following river and har-
bor acts: The act of August 8, 1917, provided for the channel to
Jacksonville (H. Doc. No. 1775, 64th Cong., 2d sess.), and the act of
January 21, 1927, provided for the 12-foot channel (H. Doc. No. 450,
69th Cong., 1st sess.). The latest published map is in the last-men-
tioned document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-The north end of this waterway is in 'Beau-
fort Harbor and harbor at Morehead City, the terminal facilities
of which are described in the reports for those improvements in
this report. There are 23 wharves at or near Swansboro. Through-
out the rest of the waterway several wharves and landings are
used mostly for shipping agricultural products. The facilities are
considered adequate for existing commerce.
    Operations and results during fiscal year.-The work consisted
of maintenance dredging with Government plant and hired labor.
The U. S. dredge Henry Bacon removed 103,767 cubic yards of
sand and mud from section 1; 498,338 cubic yards from section 2;
142,832 cubic yards from section 3; and 8,724 cubic yards from sec-
tion 4; a total of 753,661 cubic yards. This work resulted in restoring
the waterway to project dimensions. The cost and expenditures
were $60,022.28, all for maintenance.
             RIVERS AND HARBORS-WILMINGTON,                                    N.       C., DISTRICT              377
   Condition at end of fiscal year.-The existing project was com-
pleted in 1932, at a saving of $1,556,492 under the estimated cost. The
governing mean low water depths are 11 feet from Beaufort Harbor
to Swansboro; thence 10 feet to New River; thence 10.3 feet to
Wrightsville Causeway and thence 10.3 feet to Cape Fear River. The
total cost and expenditures under the existing project to June 30.
1934, have been $2,243,507.82 for new work and $209,665.11 for
maintenance, a total of $2,453,172.93.
  Proposed operations.-The balance unexpended July 1, 1934, $100,-
301.41, will be applied to the maintenance of the entire waterway
by the removal of about 800,000 cubic yards of material, with the
Government dredge Henry Bacon, between October 1, 1934, and
January 31, 1935.
  The additional sum of $150,000 can be profitably expended during
the fiscal year ending June 30, 1936, and will be applied to the main-
tenance of the entire waterway between October 1, 1935, and April 30,
1936.
                                     Cost and financial summary

Cost of new work to June 30, 1934__-__        ________________ $2, 442, 214.74
,Cost of maintenance to June 30, 1934 __...______          -_______ 317, 299. 05

           Total cost of permanent work to June 30, 1934-------- 2, 759, 513. 79

Net total expenditures_________----------------            2, 759, 513. 79
Unexpended balance June 30, 1934--------------------------100, 301. 41

           Total amount appropriated to June 30, 1934-----------                                       2, 859, 815. 20


   Fiscal year ending June 30              1930            1931             1932            1933              1934

Cost of new work __--  ------- $1, 004, 406. 45         $557, 964. 20   $520, 744. 50     $28, 837. 62
                    ........------ 8, 948. 51
Cost of maintenance------                                      33. 08     59, 774. 06      79, 966. 48       $60, 022. 28

       Total cost-----------------   1, 013, 354. 96     557, 997. 28    580, 518. 56     108, 804. 10        60, 022. 28
Total expended_                        933, 571. 48      579, 021. 78    654, 786. 92     125, 418. 33        60, 022. 28

Allotted     ____ _________            835, 000. 00      186, 000. 00   -136, 700. 00     116, 476. 68        97, 668. 21


Balance unexpended July 1, 1933_______________                  $62,655. 48
Amount allotted from War Department Appropriation Act, approved
Apr. 26, 1934------------------------------------------- 100, 000. 00

     Amount to be accounted for--------------------------        162, 655. 48
Deductions on account of revocation of impounded funds----------   2, 331. 79

      Net amount to be accounted for__----___--____---- 160, 323. 69
Gross amount expended----------                      $60, 172.28
Less reimbursements collected------------------------     150. 00
                                                                  60, 022. 28
           Balance unexpended June 30, 1934                                                 --
                                                                                         -_____ 100, 301. 41

Amount that can be profitably expended in fiscal year ending June
   30, 1936 for maintenance            1               ------------                          _     _     150, 000. 00

  1   Exclusive of available funds.
378    REPORT OF CHIEF OF ENGINEERS,         U. S.   ARMY,   1934

16. INTRACOASTAL WATERWAY FROM CAPE FEAR RIVER, N. C., TO
                    WINYAH BAY, S. C.

   Location.-This waterway begins at Southport, N. C., and follows
in general a route from the Cape Fear River up Elizabeth River 6.7
miles to a point near its headwaters; thence through high ground
2.6 miles to the headwaters of Davis Creek; thence down Davis
Creek to the sounds and salt marshes and through the latter to Little
River, S. C., a distance of 24.2 miles; thence up Little River 5.7
miles to its headwaters; thence through high ground 21.8 miles to
the head of Socastee Creek; thence down Socastee Creek 6.5 miles
to the Waccamaw River, and down the latter 27 miles to Winyah
Bay; a total distance of 94.5 miles. (See U. S. Coast and Geodetic
Survey Charts Nos. 1236 and 1237.)
   Existing project.-This provides for a waterway 8 feet deep at
mean low water, with a bottom width of 75 feet, between Cape Fear
River, N. C., and Winyah Bay, S. C., a distance of approximately
94.5 miles. The mean range of tide on Cape Fear bar is 4.5 feet;
at inlets 4 feet, varying to 2 feet at points midway between inlets
and in Winyah Bay, at Georgetown, 3.3 feet.
   The estimate of cost for new work made in 1932 is $5,619,000.
The latest (1929) approved estimate for annual cost of maintenance
is $50,200.
   The existing project was adopted by the River and Harbor Act
of July 3, 1930 (H. Doc. No. 41, 71st Cong., 1st sess.). The latest
published map is in this document. The construction of bridges in
Horry County as recommended by the Chief of Engineers in Rivers
and Harbors Committee Document No. 14, Seventy-second Congress,
first session, was included in the public-works program under the
National Industrial Recovery Act.
   Recommended modifications of project.-Included in public-works
program.
   Local cooperation.-The existing project imposes the conditions
that local interests shall construct and maintain all bridges over the
waterway and furnish free of cost to the United States rights-of-way
of sufficient width for the canal prism and the disposal of spoil there-
from. The entire right of way from Cape Fear River, N. C., to
Winyah Bay, S. C., has been deeded to the United States, with the
exception of small tracts in Horry County, S. C., where court action
as to awards in condemnation is pending. The State of North
Carolina by act of its general assembly, session of 1931, authorized
and directed that the State highway commission or the road govern-
ing body of any political subdivision of the State of North Carolina
construct, maintain, and operate all bridges over the waterway in
the State of North Carolina without cost to the United States. The
State of South Carolina, by act of its general assembly, session of
1932, authorized and directed that the State highway department
and the county commissioners of Horry County, S. C., provide and
maintain detours and temporary means of crossing the proposed
       RIVERS AND HARBORS-WILMINGTON,          N.   C., DISTRICT   379

waterway from Little River to Winyah Bay as may be necessary in
the interest of traffic over the State and county highways, and by act
of its general assembly, session of 1934, authorized and directed the
,State highway department to accept, maintain, replace, and operate
the three bridges in Horry County to be built by the United States.
   Terminal facilities.-There are numerous wharves and landings
along the present waterways which are used mostly for shipping
agricultural products. These wharves are of the open pile and tim-
ber type. The facilities are considered adequate for existing
commerce.
             OPERATIONS AND RESULTS DURING FISCAL YEAR

   Regular funds.-All work during the year was new work. Work
with regular maintenance and improvement funds consisted of the
removal with the Government dredge Currituck of 787,267 cubic
yards of material, and with the Government dredge Henry Bacon of
1,073,097 cubic yards, from the north end of the section; the removal
under contract of 1,296,740 cubic yards and clearing under contract
of 95.16 acres in the south end of the section. This work resulted
in securing project dimensions in the north end of the section from
a point 1 mile north of the crossing of State Highway No. 49 to a
point 2.5 miles south of the crossing; and in the south end of the
section from a point on Waccamaw River at the mouth of Socastee
Creek to Bucksport, S. C., a distance of 2.5 miles, and from a point
1.3 miles north of the crossing of State Highway No. 38 to a point
2 miles south of the crossing of the Atlantic Coast Line Railroad, a
distance of 2.3 miles. The costs during the year were $293,366.99 for
dredging with Government plant and hired labor in the north end
of the section; $30,337.15 for clearing by contract; $102,327.75 for
dredging by contract, in the south end of the section; $258 Govern-
ment cost incident to the completion of the H. C. Nutting core-boring
contract; and $14,026.08 in connection with the adjustment of the
Arundel Corporation's claim; a total of $440,315.97, all for new work.
The expenditures were $519,058.84.
   Public Works fwnds.-Work during the year with funds allotted
by the Federal Emergency Administration of Public Works con-
sisted of the removal under contract of 1,596,841 cubic yards of ma-
terial from the south end of the section; clearing under contract of
75.45 acres in the south end and 592.32 acres in the middle portion;
taking core borings under contract in the middle portion of the sec-
tion; the construction under contract of a temporary railroad bridge
at the crossing of the Atlantic Coast Line Railroad; the preparation
under contract of plans for a combination railroad and highway
bridge at the crossing of the Atlantic Coast Line Railroad and for
two highway bridges at the crossing of State Highways Nos. 38 and
49, and miscellaneous surveys. This work resulted in securing proj-
ect dimensions in the south end of the section from a point 2 miles
south of the crossing of the Atlantic Coast Line Railroad to a point
380      REPORT    OF CHIEF OF      ENGINEERS, U.      S. ARMY,     1934


0.3 mile north of the crossing. The canal prism was cleared through
the remaining 17.5 miles. The costs during the year were $30,536.21
for clearing by contract and $196,125.97 for dredging, including rock
removal, by contract, in the south end of the section; $142,151.15
for clearing by contract and $7,001.87 for core borings by contract
in the remaining middle portion of the section; $6,125.32 for the
construction under contract of a temporary railroad bridge and the
preparation of plans for a combination railway and highway bridge
at the crossing of the Atlantic Coast Line Railroad; $1,374.75 for
the preparation of plans of a highway bridge at the crossing of State
Highway No. 38; $1,479.58 for the preparation of plans for a high-
way bridge at the crossing of State Highway No. 49; and $9,498.73
for location and miscellaneous surveys; a total of $394,293.58, all for
new work. The expenditures: were $363,715.75.
   Condition at end of fiscal year.-At the end of the year the exist-
ing project was about 49 percent completed. Under regular mainte-
nance and improvement appropriations the waterway has been com-
pleted from Cape Fear River, with the exception of 400 feet, to a
point in the headwaters of Little River 2.5 miles south of the cross-
ing of State Highway No. 49, a distance of 41.3 miles, and from a
point 2 miles south of the crossing of the Atlantic Coast Line Rail-
road to Winyah Bay, a distance of 36.4 miles.
   Under an allotment from the Federal Emergency Administration
of Public Works, project dimensions in the south end were extended
2.3 miles to a point 0.3 mile north of the. crossing of the Atlantic
Coast Line Railroad and 37.9 miles from Winyah Bay. The 15.3-
mile reach remaining to be dredged between Little River and Wac-
camaw River has been cleared. In connection with the three pro-
posed bridges in Horry County, S. C., authorized under the provi-
sions of the National Industrial Recovery Act, a temporary railroad
bridge has, been constructed by the United States at the crossing of
the Atlantic Coast Line Railroad and temporary highway bridges
have been constructed by the State highway department at the cross-
ings of State Highways Nos. 38 and 49. Plans have been prepared
for the construction of the permanent highway bridges and are in
progress for the construction of the combination highway-railway
bridge.
   The total cost of the work under the improvement to June 30, 1934,
was $1,846,864.70 for new work, and $13,325.13 for maintenance, a
total of $1,860,189.83 from regular funds, and $394,293.58 for new
work from Public Works funds. The total expenditures were
$2,226,025.57, including $363,715.75 from Public Works: funds.
   Proposed operations.-The balance unexpended, including accounts
receivable, July 1, 1934, $111,564.80 from regular funds and $886,-
284.25 from an allotment made under the National Industrial Re-
covery Act of 1933, together with an additional allotment of $650,000
made in July 1934 under the National Industrial Recovery Act of
1933, a total of $1,647,849.05, will be applied as follows:
Accounts payable July 1, 1934__                  __-___________        $6, 259. 85
New work--Regular maintenance and improvement funds: Comple-
  tion of dredging in the north end of the section to a point 2:1/2
  miles south of the crossing of Stt.e I-ighway No. 49, by U. S. pipe-
  line dredge Henry Bacon and hired labor, July 1, to Aug. 10, 1934    55, 189. 28
         RIVERS AND HARBORS--           ILMINGTON, N. C., DISTRICT               381
New work--Funds allotted under the National Industrial Recovery
Act of 1933:
   Accounts payable July 1, 1934_----------------_---                  $35, 725. 79
   Completion of the contract for dredging the 23/ 4 -mile reach
      extending northward from a point 100 feet south of the cross-
      ing of the Atlantic Coast Line R. R., July 1, 1934, to Jan.
     10, 1935------------------------------------------                299, 097.28
   Dredging the 13/4 -mile reach extending southward from a point
      in the headwaters of Little River 2:1/ miles south of the cross-
      ing of State Highway No. 49 to a point 41/ miles south of the
      crossing, by contract, Aug. 15, 1934, to Jan. 20, 1935--------- 196, 500. 00
   Dredging the southerly 2 miles of the 4-mile reach extending
      northward from a point 234 miles north of the crossing of the
     Atlantic Coast Line R. R., by continuing contract, Jan. 11,
     to June 30, 1935__________________                         _      283, 000. 00
   Dredging the northerly 2 miles of the 4/4 -mile reach extend-
     ing southward from a point 41/2 miles south of the crossing
      of Highway No. 49, by continuing contract, Jan. 21 to June
     30, 1935-----------------------------------------------283, 000.00
   Completion of drilling and blasting conglomerate, as indicated
      by former dredging operations will be necessary in advance
      of dredging, from a point 6 miles south of the crossing of
      State Highway No. 49 to a point 2/         miles north of the
      crossing of the Atlntic Coast R. R. near Myrtle Beach,
      S. C., by hired labor, July 1, 1934, to Feb. 28, 1935 ...   _...  24, 000. 00
   Construction of a highway bridge at the crossing of State
      Highway No. 38 in the south portion of the section by
      contract, July 15, 1934, to Feb. 15, 1935 _      ____     _ _    108, 535. 97
   Construction of a highway bridge at the crossing of State
      Highway No. 49 in the north portion of the section, by
      contract, Aug. 15, 1934, to Mar. 15, 1935------------------       95, 040. 34
   Construction of a combination railway and highway bridge
      at the Atlantic Coast Line Ry. crossing of the waterway
      near Myrtle Beach, by contract, Oct. 1, 1934, to May 30,
      1935--------------------------                                   210, 000. 00
   Surveys and supervision of the project, July 1, 1934, to
     June 30, 1935------                          ----------              1, 384. 87
Maintenance-maintenance and improvement funds: Dredging be-
   tween Cape Fear River and Little River with Government
   plant and hired labor, Jan. 1 to Feb. 28, 1935--------------         50, 115. 67

      Total for all work_-------------------------------------         1, 647, 849. 05
  The additional sum of $944,000 can be profitably expended during
the fiscal year ending June 30, 193'6, as follows:
New work:
   Completion of dredging the 4-mile reach extending northward
     from a point 23/4 miles north of the crossing of the Atlantic
     Coast Line R. R., by continuing contract, July 1 to Dec. 31, 1935_ $297, 000
   Completion of dredging the 41/4 -mile reach extending southward
     from a point 41/2 miles south of the crossing of Highway No. 49,
     by continuing contract, July 1, to Dec. 31, 1935        __          316, 000
   Dredging the northerly 1/ miles of the remaining 2%-mile reach
     in the middle portion of the section by continuing contract,
     Jan. 1, to June 30, 1936---------------------------------           262, 000

                                                                             875, 000
Maintenance: Dredging between Cape Fear River and Little River,
under contract, between Apr. 1 and June 30, 1936_ _         _
                                                     __--_-___--              69, 000

      Total for all work_-------      ------------------------------         944, 000
382            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

                                        Cost and financial summary

                                                    REGULAR FUNDS

Cost of new work to June 30, 1934__________________________ $1, 846, 864. 70
Cost of maintenance to June 30, 1934_   _______________-___      13, 325. 13
      Total cost of permanent work to June 30, 1934                                                   1---------,
                                                                                                         860, 189. 83
Value of plant, materials, etc., on hand June 30, 1934 ...........                                          8, 287. 44
      Net total cost to June 30, 1934___                                                              1, 868, 477. 27
Plus accounts receivable June 30, 1934-------------------------                                                    92.40

     Gross total costs to June 30, 1934                                                               1, 868, 569. 67
Minus accounts payable June 30, 1934    __                                                                 6, 259. 85

     Net total expenditures                                                                           1-----------------------------,
                                                                                                         862, 309. 82
Unexpended balance June 30, 1934-------                                                       ___        111, 472. 40

           Total amount appropriated to June 30, 1934______________                                   1, 973, 782. 22

   Fiscal year ending June 30                1930            1931            1932             1933               1934


Cost of new work----------------...............          $188,319.93      $841, 742. 04    $376, 112. 65       $440, 315. 97
Cost of maintenance-----------------                                                         13,237. 41
      Total cost-----                 --------------      188, 319. 93    841, 742. 04      389, 350. 06       440, 315. 97
Total expended                                            136, 420. 82    829, 041. 48      377, 788. 68        519, 058. 84

Allotted     .---------------              __-
                                             ___-
                                  -----........ -       1, 096, 000. 00     47, 600. 00     517, 771. 19       312, 411. 03


Balance unexpended July 1, 1933---                                                                         $318, 120. 21
Amount allotted from War Department Appropriation                                         Act ap-
  proved July 14, 1932__ ____                                                                              315, 000. 00
     Amount to be acounted for- ----------------------------                                                633, 120. 21
Deductions on acount of revocation of impounded funds .------                                                 2, 588. 97
      Net amount to be acounted for       .----                                                             630, 531. 24
Gross amount expended----------------------                                      $532, 608. 78
Less reimbursements collected   ---------------                                    13, 549. 94
                                                                                                           519, 058. 84

      Balance unexpended June 30, 1934 _______________                                         ___         111, 472. 40
Outstanding liabilities June 30, 1934--------------------                                                    9,566. 96

     Balance available June 30, 1934------------------------101, 905. 44
Accounts receivable June 30, 1934___________________________ -    92. 40

           Unobligated balance available June 30, 1934____________-                                        101, 997. 84

Amount (estimated) required to be appropriated for completion
of existing project 1  ----------------------------------    1,163, 000. 00

Amount that can be profitably expended in fiscal year ending June
30, 1936:
    For For
         ne work
         new      1_________________________
             work------------------------------------------8500.0 875, 000.00
    For maintenance -_______-- ____________                        69, 000. 00

           Total 1--_--_-----------                                                                        944, 000. 00

  1Exclusive of available funds.
             RIVERS AND HARBORS-WILMINGTON,                                                    N. C., DISTRICT                         383
                                                PUBIC WORKS                 FUNDS

Cost of new work to June 30, 1934 _________-                                                        --               -____
                                                                                                                         $394, 293. 58
Cost of maintenance to June 30, 1934______                                                          __        ___

      Total cost of permanent work to June 30, 1934 _________ -                                                            394, 293. 58
Value of plant, materials, etc., on hand June 30, 1934_-__ _-___-                                                            5,147.96
     Net total cost to June 30, 1934____________                                               _______                     399, 441. 54
Minus acounts payable June 30, 1934____.___.                                                 _______-                _      35,725. 79
     Net total expenditures ------------------------------                                                                 363, 715.75
Unexpended balance June 30, 1934 _____________   __________                                                                886, 284. 25
         Total amount appropriated to June 30, 1934__________.                                                           1,250,000. 00

   Fiscal year ending June 30                   1930                 1931                  1932                   1933              1934


                                    -------------------------------------------
Cost of new work-..........-----------....--                                                                                     $394,293.58
Cost of maintenance .                   --
                                     .-----.-      ------------                  - --------------.-------------           - --     ---------
Total expended--.---------------                       -----------------------------------------.                                  363, 715. 75

Allotted--------.............------------------            --------------------------.... ------------                           1,250, 000. 00



Amount allotted from National Industrial Recovery Act ap-
  proved June 16, 1933  --------------------------------- $1, 250, 000. 00
Gross amount expended ____ -  -__________________$364,921.15
Less reimbursements collected-------------------    1,205.40
                                                              363, 715. 75

      Balance unexpended June 30, 1934---------------------886, 284.25
Outstanding liabilities June 30, 1934------------- $11, 264. 92
Amount covered by uncompleted contracts---------330, 534. 02
                                                                341, 798. 94

    Balance available June 30, 1934 ___________________-                                                                   544,485.31
Amount allotted by Public Works Administration Emergency
Appropriation Act fiscal year 1935                                                                                         50,000. 00
                                                                                                                           6------------------------

         Balance available for fiscal year 1935----------------                                                          1, 194, 485.31
CONSOLIDATED COST AND FINANCIAL SUMMARY FOR WATERWAY                                                               CAPE FEAR RIVER,
                       N. C., TO WINYAH BAY, S. C.

Cost 'of new work to June 30, 1934________________--___---$2, 241, 158.28
Cost of maintenance to June 30, 1934 ______________----___     13, 325.13
      Total cost of permanent work to June 30, 1934_ .___                                                                2, 254, 483. 41
Value of plant, materials, etc., on hand June 30, 1934 ______-                                                               13,435.40

     Net total cost to June 30, 1934_-_____----------                                                                    2,267,918.81
Plus accounts receivable June 30, 1934___ __-___-                                                                               9______
                                                                                                                                -92.40

     Gross total costs to June 30, 1934-------------                                                                    2, 268, 011.21
                                                                                                                    -___-.
Minus accounts payable June 30, 1934___-- ---------                                                                         41, 985.64
     Net total expenditures_--------------------------                                                                   2, 26,025. 57
Unexpended balance June 30, 1934------------------------                                                                   997, 756.65

         Total amount appropriated to June 30, 1934-----------                                                           3, 223, 782. 22
         91536--ENG 1934-----25
384          REPORT OF CHIEF OF ENGINEERS,                                 U.     S. ARMY,         1934


      Fiscal year ending June 30            1930              1931           1932           1933               1934


Cost of new work    ____________-------------- ....       $188, 319. 93 $841, 742. 04 $376, 112. 65    $834, 609. 55
Cost of maintenance     .-----.....-------------          . .---------------------------13, 237. 41 -.
        Total cost------------     --------------          188, 319.93     841, 742. 04   389, 350. 06        834, 609. 55

Total expended---------------------------                  136, 420. 82    829, 041. 48   377, 788. 68        882, 774. 59

Allotted----------.   .--------------..----------        1, 096, 000. 00   47, 600. 00    517, 773. 09      1, 562, 411. 03


Balance unexpended July 1, 1933            ---                                                           $318, 1.20.21
Amount allotted from War Department Appropri-
  ation Act approved July 14, 1932L ______-__                                    $315, 000. 00
Amount allotted from National Industrial Re-
covery Act approved June 16, 1933_       ---                                   1, 250, 000. 00
                                                                                                    1, 565, 000. 00

     Amount to be accounted for__                                                                     883, 120. 21
                                                                                                    1____________---------,
Deductions on account of revocation of impounded funds------                                            21,588. 97

...
      Net amount to. be. accounted for____1_____________
                                                    n.. . . . . .
                                                                    _
                                                                  . .
                                                                                                    1, 880, 531. 24
Gross amount expended------------------            $897, 529. 93
Less reimbursements collected _________      -_____ 14, 755. 34
                                                                                                         882, 774. 59

      Balance unexpended June 30, 1934--------------------997, 756. 65
Outstanding liabilities June 30, 1934--------- $20, 831. 88
Amount covered by uncompleted contracts.--     330, 534. 02
                                                            351, 365. 90

     Balance available June 30, 1934------------------------   646, 390. 75
Accounts receivable June 30, 1934-----------------------------       92. 40
Amount allotted by Public Works Administration Emergency
  Appropriation Act, fiscal year 1935------------------------  650, 000. 00

          Balance available for fiscal year 1935-----------------                                  -1, 296, 483. 15

Amount (estimated) required to be appropriated for completion
  of existing project 1--_                   ---------                                              1, 163,000. 00

Amount that can be: profitably expended in fiscal year ending
June 30, 1936:
   For new work 1                                                                                        '875, 000. 00
   For maintenance 1                                        -...                                           69, 000. 00

          Total       -      ____           -                                                --           944, 000. 00

                            17. MOREHEAD CITY HARBOR, N. C.

  Location.-This harbor is situated on the northern shore of Bogue
Sound, adjacent to Beaufort Harbor and Inlet. New Bern, N. C.,
the nearest city of importance, is about 43 miles by inland water-
way to the northwest. (See U. S. Coast and Geodetic Survey Chart
No. 420.)
  Eisting project.-This provides for a channel 12 feet deep and
100 feet wide from deep water in Beaufort Outer Harbor to Sixth
Street, Morehead City, thence 200 to 400 feet wide to Tenth Street,,
and for a channel 6 feet deep and 75 feet wide connecting the western
end of the harbor with Bogue Sound. The average rise of the tide
is about 2.5 feet. One year's- observations show :that the extreme
range of tides is 4.8 feet.
  1
      Exclusive of available       funds.
         RIVERS AND HARBORS-WILMINGTON,              N.   C., DISTRICT     38$

   The estimate of cost for new work, revised in 1930, was $55,000,
with $4,000 annually for maintenance.
   The existing project was authorized by the following river and
harbor acts: The act of June 25, 1910 (H. Doc. No. 649, 61st Cong.,
2d sess.) provided for channels 10 feet deep; and the act of July 3,
1930, provided for the 12-foot channel and for the 6-foot channel
to Bogue Sound (H. Doc. No. 105, 70th Cong., 1st sess.). The latest
published map is in the last-mentioned document.
   Supplementing the work authorized by Congress the provision of
a 30-foot channel from the bar at Beaufort Inlet to the proposed
location of the marine terminals at Morehead City, at an estimated
cost of $1,555,000, as recommended by the Chief of Engineers to the
Administrator, Federal Emergency Administration of Public Works,
May 12, 1934, has been included in the Public Works program.
   Local cooperation.-The work included in the Public Works pro-
gram is subject to the requirement that local interests furnish satis-
factory assurances that suitable terminal facilities will be provided
at Morehead City. All prior requirements have been fully complied
with.
   Terminal facilities.-There are 37 wharves along the main water
front of the town. They have a total frontage of about 1,182 feet.
There is no place where commerce can be transferred direct from
rail to water carriers or vice versa, and in this respect the terminal
facilities are considered inadequate.
   Operations and results during flscal year.-None.
   Condition at end of fiscal year.-No work has been done on the
project authorized by the Federal Emergency Administration of
Public Works. The existing project was completed in 1931. At the
end of the year a channel 12 feet deep at mean low water existed from
deep water in Beaufort Outer Harbor to the foot of Tenth Street
in Morehead City, and thence a channel 6 feet deep at mean low
water connecting the western end of the harbor with Bogue Sound.
The total costs and expenditures have been $56,791.58 for new work
and $18,736.99 for maintenance, a total of $75,528.57.
  Proposed operations.-No maintenance and improvement funds are
on hand. The allotment of $1,555,000 made under the provisions o f
the National Industrial Recovery Act, will be applied as follows:
Removing about 2,255,000 cubic yards of material from Beaufort
  Inlet Channel with Government plant and hired labor, between
  Aug. 15, 1934, and June 30, 1935_--------------------------------   $340, 000
Removing about 1,913,000 cubic yards of material from the channel
  between the inlet and the proposed terminals and from in front of
  the proposed terminals, under contract, between Jan. 1 and June
  30, 1935------------------------------------------------------       210, 000
Constructing shore arms of protecting jetties under contract, between
  Jan. 1 and Nov. 30, 1936--------------------------------- -------     30,000
Sinking old ship hulls in the extensions of shore-arm jetties under
  contract, between June 1, 1937, and June 30, 1938-----------------   475,i000

      Total for all work---------------------------------------1,55,000
  The additional sum of $98,000 can be profitably expended du'ing
the fiscal year ending June 30, 1936, of which $90,000 will be ap-
plied to the maintenance of Beaufort Inlet Channel and the channl
between the inlet and the proposed terminals and in front of the
proposed terminals. The remaining $8,000 will be applied to the
maintenance of the 12-foot channel leading to and in front of More-
386,        REPORT OF CHIEF OF ENGINEERS,                               U.   S. ARMY,           1934


head City and the 6-foot channel connecting the western end of
this channel with Bogue Sound.
                                     Cost and financia suumary

Cost of new work to June 30, 1934_                                                                $56, 791. 58
Cost of maintenance to June 30, 1934---                                                 ----       18, 736. 99

      Total cost of permanent work to June 30, 1934---------------75, 528. 57
Net total expenditures-----------------------------------------    75, 528 57
      Total amount appropriated to June 30, 1934----------------- 75, 528. 57

   Fiscal year ending June 30             1930            1931           1932            1933          1934

Cost of new work........---------- ..--------------     $36, 500 .-----------------------------
Cost of maintenace-------------            -------------------------------------------             -------------
Total expended     ....------------------------------       36, 500------------------------
Allotted _- -----------------          -$4, 871. 43         36, 500 -


Amount allotted by the Public Works Administration Emergency
  Appropriation Act, fiscal year 1935__________________________ $1,555, 000
Balance available for fiscal year 1935 ------------------        1, 555,000
Amount that can be profitably expended in fiscal year ending
June 30, 1936 for maintenance 1__ ________________________                                            98, 000

                                   18. BEAUFORT INLET, N. C.

   Location. Beaufort Inlet connects Beaufort Harbor with the
Atlantic Ocean and is about 3 miles from the town of Beaufort.
 (See U. S. Coast and Geodetic Survey Chart No. 420.)
   Existing project.--This provides for a channel 300 feet wide and
20 feet deep at mean low water, Beaufort datum, across the bar, to
be obtained by dredging. The length of this channel is 11,500 feet.
The average rise of tide is 2.5 feet at Beaufort and 3.5 feet at the
inlet. From automatic tide gage readings of over 3 years the ex-
treme range of tides is 7.9 feet. The estimate of cost for new work,
made in 1903, was $45,000. The latest (1903) approved estimate for
annual cost of maintenance is $15,000.
   The existing project was adopted by the River and Harbor Act of
March 3, 1905 (H. Doc. No. 563, 58th Cong., 2d sess.). For the latest
published map see House Document No. 1454, Sixtieth Congress,
second session.
   Terminal facilities.-There are no wharves on this improvement,
and none are needed.
   Operations and results during fiscal year.-None. There were no
costs or expenditures.
   Condition at end of fiscal year.-The project was completed in
1910. At the close of the year the controlling mean low water depth
was 10 feet. The cost and expenditures under the existing project
to June 30, 1934, were $44,484.24 for new work and $229,557.44 for
graintenance, a total of $274,041.68.
   Proposed operations.-An allotment of $35,000 made during Au-
gust 1934 will be applied to maintenance dredging on the bar channel
during the fall of 1934. No additional funds can be profitably ex-
pended during the fiscal year 1936.
     Exclusive of available funds.
              RIVERS AND HARBORS-WILMINGTON,                                  N. C., DISTRICT                        387
                                        Cost and financial sumnmary

Cost of new work to June 30, 1934--------------------------                                            $44, 484.24
Cost of maintenance to June 30, 1934------------------------                                           229, 957. 44

      Total cost of permanent work to June 30, 1934__                                                   274, 041. 68
Net total expenditures   -__-__                                                                         274, 041. 68
Total amount appropriated to June 30, 1934_____________________                                         274, 041. 68

           Fiscal year ending June 30               1930         1931           1932           1933             1934


Cost of new work        ----------------.-
Cost of maintenance.------------------ $20, 405. 99              $720. 91    $15, 535. 05   $20, 192. 01   -

Total-expended...-----------------------24, 232. 89               720. 91      5, 780. 01    29, 947. 05----------

Allotted          ----------
                   -            --------------- -6,
                                                ---- 500. 00   13, 500. 00    10, 000. 00    12, 609. 68   -   --      -



                   19. HARBOR OF REFUGE, CAPE LOOKOUT, N. C.
  Location.-Cape Lookout is the middle one of the three prominent
capes on the coast of North Carolina. Cape Hatteras is about 74
miles to the northeast and Cape Fear about 95 miles to the southwest.
(See U. S. Coast and Geodetic Survey Charts Nos. 421 and 1233.)
  Previous projects.-The act of March 3, 1899, appropriated $5,000,
which was expended in making an examination, survey, plan, and
estimate for a harbor of refuge at Cape Lookout.
  Existing project.-This provides for a harbor of refuge enclosing
by means of a rubble-stone breakwater 7,050 feet long an area of
575 acres of 30 feet or more in depth at mean low water. The
mean range of tide is 3.7 feet. Automatic tide-gage readings of
over 3 years show .7.9 feet as the extreme range of tides. The
estimate of cost for new work, revised in 1925, is $2,524,000, exclusive
of amounts expended on previous projects.           The latest (1917)
approved estimate for annual cost of maintenance is $20,000.
  This project was adopted by the River and Harbor Act of July
25, 1912 (H. Doc. No. 528, 62d Cong., 2d sess.). The latest published
map is in House Document No. 25, Fifty-fifth Congress, second
session.
   Terminal facilities.-There are two small wharves in this harbor.
The existing facilities are considered adequate for the present
commerce.
   Operations and results during fiscal year.-None. There were no
costs or expenditures.
   Condition at end of fiscal year.-The project is 56 percent com-
pleted. The breakwater is now showing above low water from the
original shore line to a point 4,800 feet beyond, with the mattress
stone deposited 200 feet in advance of this. The original shore line
has moved 1,700 feet seaward on the south side of the breakwater,
and the wall for its entire length is from 3 to 6 feet lower than
originally built. The controlling depth at the harbor entrance
the close of the year was 42 feet. The costs and expenditures under
                                                                                                                       :at
the existing project to June 30, 1934, have been $1,363,798.72, 'for
new work, and $32,853.75 for maintenance, a total of $1,396,652.47.
 3'           REPORT OF CHIEF OF ENGINEERS,                                    U.   S.   ARMY,         1934

  Proposed operations.-The balance unexpended July 1, 1934,
$2000 will be applied to maintaining sand fences with hired labor,
betweei July 1, 1934, and June 30, 1935.
  The additional sum of $2,000 can be profitably expended during
the fiscal year ending June 30, 1936, and will be applied to the
maintenance of sand fences with hired labor, between July 1, 1935,
and June 30, 1936.
   Funds for new work are not required for the reason that com-
pletion of the project is not considered necessary at the present time.
                                       Cost and financial sunmmar

Cost of new work to June 30,.1934_ _____________----------                                              $1, 368, 798.72
Cost of maintenance to June 30, 1934_                                                        ------          32, 853. 75

            Total cost of permanent work to June 30, 1934                                                 1, 401, 652. 47

Net total expenditures ______________-------_1,                                                              401, 652. 47
Unexpended balance June 30, 1934-------------                                                                  2, 000. 00

            Total amount appropriated to June 30, 1934-----------                                         1, 403, 652. 47

            Fiscal year ending June 30                         1930     1931         1932             1933             1934


Cost ofnew work -.. . . . .               . . . .i .      . . . .                        .      . . . .      .
Cost of maintenance....------------------- $1, 700. 16 $355. 44                          --------                ---

Total expended........-----------------------              1, 700. 16    465. 44
Allotted.                ..----------------------------- 2, 000. 00                -$1, 500
                                                                        .------------               -$367. 53            $2, 000


Amount allotted from War Department Appropriation Act approved
  Apr. 26, 1934-------------------------------------------------                                                       $2, 000
Balance unexpended June 30, 1934--------------------------------                                                        2,000
Amount (estimated) required to be appropriated for completion of
   existing project -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1,160, 000

Amount that can be profitably expended in fiscal year ending June
   30, 1936, for maintenance               1----------------                                                           2,000

            20. CAPE FEAR RIVER, N. C., AT AND BELOW WILMINGTON

   Location.-This river is formed by the confluence at Moncure,
N. C., in Chatham County, of the Deep and Haw Rivers. It flows in
a southeasterly direction and empties into the Atlantic Ocean at Cape
Fear, near the southern extremity of the State. (See U. S. Coast
and Geodetic Survey Charts Nos. 424 and 425.)
   Previous projects.-Authorized by acts of March 2, 1829; July
22, 1854; July 11, 1870; March 3, 1873; June 23, 1874; September 19,
1890; June 13, 1902; and March 2, 1907. The cost and expenditures
on these projects were $4,625,614.67 for new work and $602,614.25
for maintenance, making a total of $5,228,228.92.        (For further
details see p. 1804 of Annual Report for 1915.)
   Existing project.-The existing project provides for a channel
across the bar 30 feet deep and 400 feet wide from Baldhead Point
in a southwesterly direction; thence 30 feet deep and 300 feet wide
in the river up to Wilmington, with increased width at bends; and
for an anchorage basin of the same depth at Wilmington 2,000 feet
   1 Exclusive of available funds.
       RIVERS AND HARBORS-WILMINGTON,          N. C., DISTRICT    389
long, 900 feet wide at the upper end, and 1,100 feet at the lower end,
with approaches 1,500 feet long at both ends, and for a turning basin
30 feet deep at Wilmington, 1,000 feet long, and 600 feet wide, with
approaches 500 feet long at both ends, located opposite the principal
terminals. The plane of reference is mean low water. The length
of the section under improvement is about 30 miles, the upper limit
being at Hilton Bridge (Atlantic Coast Line and Seaboard Air Line
Railroads) on Northeast Cape Fear River, 11/4 miles above its mouth.
The average rise of the tide is 4.5 feet at the ocean bar, 3.5 feet at
Keg Island, and 2.5 feet at Wilmington. The extreme range of
tides is about 6.7 feet at the ocean bar, 5.7 feet at Orton Cove, and
4.1 feet at Wilmington.
   The estimated cost for new work, revised in 1930, was $1,745,700,
exclusive of amounts expended on previous projects. The latest
 (1930) approved estimate for annual cost of maintenance is $225,000.
   The existing project was adopted by the following river and har-
bor acts: The act of July 25, 1912, provided for a channel 26 feet
deep (H. Doc. No. 287, 62d Cong., 2d sess.); the act of March 2,
1919, provided for a depth of 30 feet across the bar (H. Doc. No. 746,
65th Cong., 2d sess.) ; and the act of September 22, 1922, modified
the project to the extent of providing a new channel across the bar 30
feet deep and 400 feet wide from Baldhead Point in a southwest-
erly direction (H. Doc. No. 94, 67th Cong., 1st sess.). No work has
been done on the 30-foot channel provided for by the act of March
2, 1919, and the act of September 22, 1922, eliminates this modifica-
tion. The act of July 3, 1930, modified the 26-foot project to Wil-
mington by providing for 30 feet, with a turning basin opposite the
principal terminals (Rivers and Harbors Committee Doc. No. 39,
71st Cong., 2d sess.). The latest published maps are in the Annual
Report for 1914, page 2018, and in House Document No. 615, Seven-
tieth Congress, second session.
   Terminal facilities.-There are 65 wharves of all classes at Wil-
mington. Their total frontage is about 5,500 feet. It is believed
that the terminals at Wilmington are adequate at the present time
for the commerce through this port.
   Below Wilmington there are 24 wharves which are considered
adequate for present needs. For further details see page 569,
Annual Report for 1932.
   Operations and results during fiscal year.-The work for the year
consisted of maintenance dredging and repairs to Swash Defense
and New Inlet Dams, by Government plant and hired labor. The
dredge Comstock removed 163,466 cubic yards of material from the
Ocean Bar Channel and 24,108 cubic yards of material from the river
channels and the dredge Henry Bacon removed 1,118,610 cubic yards
of material from the river channels, and anchorage and turning
basins, a total of 1,306,184 cubic yards. Thirteen thousand linear
feet of Swash Defense and New Inlet Dams were repaired by plac-
ing 338 cubic yards of concrete and 430.5 tons of riprap. As a re-
sult of the year's work the project dimensions in the Ocean Bar and
river channels and anchorage and turning basins were partially
maintained. Swash Defense and New Inlet Dams were restored to
their original condition. The cost was $102,277.99, all for mainte-
nance. The expenditures were $169,535.86.
390     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

   Condition at end of fiscal year.-The existing project was com-
pleted in 1932. A channel 29 feet deep at mean low water exists
over the ocean bar and in the river channels up to Wilmington.
The mean low-water depth in the anchorage basin varies from 28
to 30 feet, except along the eastern edge where the depth is about 24
feet. The mean low-water depth in the turning basin is 30 feet.
Both New Inlet and Swash Defense Dams are in good condition.
The total cost under the existing project to June 30, 1934, has been
$2,033,982.47 for new work and $3,043,343.37 for maintenance, a total
of $5,077,325.84. The total expenditures were $5,698,736.33.
  Proposed operations.-The balance unexpended July 1, 1934, in-
cluding accounts receivable, $398,536.75, will be applied as follows:
Accounts payable July 1, 1934------------------------------           $28,126. 64
Maintenance :
    Dredging about 900,000 cubic yards of material from the Ocean
      Bar Channel with the Government dredge Comstock, between
      July 1 and Sept. 30, 1934, and May 1 and June 30, 1935___------ 96, 000. 00
    Dredging about 150,000 cubic yards of material from section III,
      the portion of the river between 9 and 22.6 miles below Wil-
      mington, with the Government dredge Comstock, during Octo-
      ber 1934--------------------------------------           ----- 16,000.00
    Dredging about 1,800,000 cubic yards of material from the river
      channels up to Wilmington and the anchorage and turning
      basins at Wilmington with the Government dredge Henry
      Bacon between July 1 and Sept. 30, 1934, and Feb. 1 and
      June 30, 1935                                            _ _ 208, 410. 11
    Repairs to New Inlet and Swash Defense Dams during May
      and June 1935       -------------------------------------- 10, 000. 00
    Repairs to dredges        ------------------------------           40,000. 00
        Total for all work--       ------------------------------ 398, 536. 75
  The additional sum of $225,000 can be profitably expended dur-
ing the fiscal year ending June 30, 1936, and will be applied as
follows:
Maintenance:
   Dredging about 500,000 cubic yards of material from the ocean
      bar channel with the Government dredge Comstock, between
      Oct. 1 and Dec. 31, 1935-------                --------------------- $50, 000
   Dredging about 150,000 cubic yards of material from section III,
      the portion of the river between 9 and 22.6 miles below
      Wilmington, with the Government dredge Comstock, during Jan-
      uary 1936------        ----------------------------------              16, 000
   Dredging about 1,500,000 cubic yards of material from the river
      channels up to Wilmington and the anchorage and turning basins
      at Wilmington with the Government dredge Henry Bacon, be-
      tween Nov. 1, 1935, and May 31, 1936------------------- 150, 000
   Repairing New Inlet and Swash Defense Dams by placing 400 tons
      of rock and 300 cubic yards of concrete, by hired labor, during
      July and August 1935----------                 -----------------------  9, 000

         Total for all work------        --------------------------          225, 000

                          Cost and financial summary

Cost of new work to June 30, 1934------------------------ $6,659, 597. 14
Cost of maintenance to June 30, 1934----------------------3, 645, 957. 62
      Total cost of permanent work to June 30, 1934------             10,30'5, 554. 76
              RIVERS AND HARBORS-WILMINGTON,                                     N. C., DISTRIOT                      391
Value of plant, materials, etc., on hand June 30, 1934----------                                            $617, 580. 69
      Net total cost to June 30, 1934______
                                        -     ______--     ___      10, 923, 135. 45
Plus accounts receivable June 30, 1934_ -_______-      --- ______--      31, 956. 44
      Gross total costs to June 30, 1934____-----
                                          ..          __-__ 10, 955, 091. 89
Minus accounts payable June 30, 1934 ______________________      28, 126. 64
     Net total expenditures___________________________                                                10, 926, 965. 25
Unexpended balance June 30, 1934_-______________ -______                                                  366, 580. 31

         Total amount appropriated to June 30, 1934____________ 11, 293, 545. 56

   Fiscal year ending June 30             1930               1931            1932              1933               1934


Cost of new work__ -----------------                     $280, 349. 09    $762,471. 23       $27, 026. 70     .------------
Cost of maintenance----------          $149, 360. 44      143, 805. 56     117, 674. 91      124, 066. 24       $102, 277. 99
      Total cost........----------------149, 360. 44      424, 154. 65     880, 146. 14      151, 092. 94        102, 277. 99
Total expended----------------          256, 018. 05      651, 282. 59     941, 068. 51      100, 013. 87        169, 535. 86
Allotted_ _---------------------515, 000.00             1, 110, 500. 00    119, 400. 00      175, 480. 09        388, 971. 55



Balance unexpended July 1, 1933______---_______________         $147, 144. 62
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934 __--__--   __--_     $180, 000. 00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933--------------------- 346, 873. 62
                                                                 526, 873. 62
Amount to be accounted for__                     ______,,______                                              674, 018. 24
Deductions on account of-
   Revocation of allotment                             --------                     $125, 000. 00
      Revocation of impounded funds-.......-                                              12, 902. 07
                                                                                                            137, 902. 07
Net amount to be accounted for___________________________                                                   536, 116. 17
Gross amount expended--                               $715, 708.37
Less-
    Reimbursements collected__          $545, 990.73
    Receipts from sales---- ------------     "181. 78
                                                       546, 172. 51
                                                                                                            169,535. 86
Balance unexpended June 30, 1934                                                                            366, 580. 31
Outstanding liabilities June 30, 1934___                                                                     57, 655.41
Balance available June 30, 1934____________________________                                                 308, 924. 90
Accounts receivable June 30, 1934         ____ _                                     _______                 31, 956. 44
Unobligated balance available June 30, 1934__________________ 340, 881. 34
Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 225, 000. 00

              21. CAPE FEAR RIVER ABOVE WILMINGTON,                                               N. C.

  Location.-Forlocation of river see preceding report on Cape Fear
River, N. C., at and below Wilmington.
  Previous projects.--Adopted by acts of March 3, 1881 and June 13,
1902. The cost and expenditures were $149,119.19 for new work
  1Exclusive      of available funds.
392          REPORT          OF CHIEF OF ENGINEERS,                              U.   S.   ARMY,     1934


and $8,177.67 for maintenance, a total of $157,296.86. For further
details see page 1805 of Annual Report for 1915.
   Existing project.-This provides for a navigable depth of 8 feet
at low water from Navassa to the head of navigation at Fayetteville,
115 miles above Wilmington, by the construction of two locks and
dams and by dredging of river shoals between Navassa and
Fayetteville, and for a dredged channel from Wilmington to Navassa
 (4 miles) 22 feet deep at mean low water and 250 feet wide. Data
regarding locks and dams are as follows:

                                                                            Distance Distance Maximum
          Lock and dam                            Location                    from
                                                                            Wfrong-   above   available
                                                                                                ailable             Lift
                                                                            Wilming- mouth     dimen-
                                                                               ton              sions

                                                                              Miles        Miles      Feet          Feet
No. 1--------------._------          _     Kings Bluff-_                          39           69   200 by 40              11
No. 2      __         ____---- __    _____ Browns Landing - . -.      .-          71          101   200 by 40               9
No. 3____---- ----                -_____   Tolars Landing ________.__             95          125   300 by 40               9


                              Available Charac-                                                      Percent-
                              depth on ter of              Kind of                                    age of       Actual
      Lock and dam            miter sills     ter of       Kind of         Type of construction         of
                                                                                                      age          Actsual
                                  ater         tion                                                    tion
                                 water

                                  Feet
No. 1_-------------------               9 Sand ..._   Fixed___ Lock concrete,       timber                100      $507, 806
                                                                  crib dam rock filled.
No. 2_------------------               12 ___do--..------do--.-- Concrete lock, dam rock                  100       564, 848
                                                                       filled.
No. 3-------------------                 9 ___do___.....    do ..    Concrete lock, concrete dam              19    119,102



   The tide ranges from 21/2 feet at Wilmington to 1 foot at Lock
No. 1, Kings Bluff, N. C., 39 miles above. The extreme range of
lunar tides is 4.1 feet at Wilmington and 1.5 feet at Kings Bluff.
The maximum variation due to floods ranges from 70 feet at Fayette-
ville to 5 feet at Wilmington.
   The estimate of cost for new work, revised in 1930, is $1,122,600,
of which local interests are to contribute $11,750, exclusive of amount
expended on previous projects. The latest (1930) approved esti-
mate for annual cost of maintenance is $16,200.
   The project was adopted by the River and Harbor Act of June
25, 1910 (H. Doc. No. 890, 60th Cong., 1st sess.), modified by the
River and Harbor Act approved July 3, 1930, which provided for
dredging a channel 22 feet deep to Navassa. (Rivers and Harbors
Committee Doc. No. 39, 71st Cong., 2d sess.) For latest published
maps see page 1130 of the Annual Report for 1896 and House Docu-
ment No. 786, Seventy-first Congress, third session.
   Supplementing the work authorized by Congress, additional lock
and dam construction, as recommended by the Chief of Engineers
in House Document No. 786, Seventy-first Congress, third session,
has been included in the public works program under the National
Industrial Recovery Act of 1933.
   Recommended modifications of project.-Included in Public Works
program.
       RIVERS AND HARBORS-WILMINGTON           N.   C.,   DISTRICT   393

   Local cooperation.-The River and Harbor Act approved July 3,
1930, provided for a channel 22 feet deep and 250 feet wide from
Wilmington to Navassa, subject to the provision that local interests
shall contribute $11,750 to the cost of that work. This condition has
not been complied with.
   The work authorized under the Public Works program is subject
to the condition that local interests furnish assurance satisfactory to
the Chief of Engineers that a public wharf will be constructed at
Fayetteville with adequate storage facilities and railroad connec-
tions. This condition has been complied with.
   Terminal facilities.-There are eight wharves between Wilming-
ton and Fayetteville. They have a total frontage of about 854 feet.
Terminals appear to be adequate for existing commerce.
   Operations and results during fiscal year.-The operations of the
year consisted of new work in connection with providing a reliable
8-foot channel to Fayetteville with Public Works funds and mainte-
nance dredging and snagging with maintenance and improvement
funds. New work consisted of the partial construction of a third
lock and dam about 20 miles below Fayetteville and repairing and
raising Lock and Dam No. 1 three feet under contract, and repairing
Lock and Dam No. 2 and removing old jetties from the river just
below Fayetteville with Government plant and hired labor. Mainte-
nance work was performed by Government plant and hired labor and
consisted of snagging the stream between points 16 and 95 miles
above Wilmington and removing 4,880 cubic yards of material from
shoals between these points. The cost was $173,654.54 from Public
Works funds for new work and $5,072.49 from regular funds for
maintenance, a total of $178,727.03. The expenditures were minus
$4,399.55 from regular funds and $124,905.15 from Public Works
funds, a total of $120,505.60.
   Condition at end of fiscal year.-The existing project is completed
with the exception of the 22-foot channel to Navassa. The project
for additional lock and dam construction authorized by the Federal
Emergency Administrator of Public Works is about 15 percent com-
pleted. The repairing and raising of Lock and Dam No. 1 is about 58
percent completed; repairs to Lock and Dam No. 2 about 3 percent
completed, and the construction of Lock and Dam No. 3 about .19
percent completed. The controlling low-water depths are 19 feet
to a point 9 miles above Wilmington; 7 feet to Kings Bluff, Lock
and Dam No. 1; 3 feet to Browns Landing, Lock and Dam No. 2;
and 2 feet to Fayetteville, the head of navigation, and 115 miles
above Wilmington. The cost of the existing project, to June 30,
1934, was $1,099,081.71 for new work and $212,009.01 for mainte-
nance, a total of $1,311,090.72 from regular funds. The total cost of
the project authorized by the Public Works Administration was
$173,654.54.
   The expenditures have been $1,311,037.14 from regular funds and
$124,905.15 from Public Works funds-a total of $1,435,942.29.
394           REPORT OF CHIEF OF ENGTINEERS, U7. S. ARMY, 19 34

  Proposed operations.-The balance unexpended July 1, 1934, will
be applied as follows:
Accounts payable July 1, 1934, from National Industrial Recovery
Act funds--------------------------------------------------$43,                                          539. 65
New work: National Industrial Recovery Act funds:
    Completing the raising of Dam No. 1, 3 feet and
      making repairs to adjacent structures under con-
      tract, between July 1 and Oct. 31, 1934----------$50,000.00
    Repairing Lock and Dam No. 2 with Government
      plant and hired labor, between July 1, 1934,
      and Mar. 31, 1935______________----         __-____ 275, 000.00
    Completing the construction of Lock and Dam No.
      3 under contract, between July 1, 1934, and Mar.
      31 1935---------------------------------             500,000.00
    Dredging between Wilmington and Lock and Dam
           2 under contract, between Nov. 1, 1934, and
          2r:
            28, 1935
           dFeb.       -----------------------------------  55, 000. 00
    Removing old jetties from pool above Lock and
      Dam No. 3 with Government plant and hired
      labor, between Aug. 1 and Sept. 30, 1934--------_      5, 000. 00
    Special engineering and contingencies, including
      purchasing site and building lock-tenders' houses
      at Lock and Dam No. 3 between July 1, 1934,
      and Mar. 31, 1935-       ------------------------     66, 555. 20

        Total----------------------------------------            951, 555. 20
Mlaintenance: Maintenance and improvement fundss:
    Snagging and dredging between Wilmington and Fayetteville,
      115 miles above, with the Government derrick boats North-
      east and Contentnea about 10 months, between July 1, 1934,
      and June 30, 19,35---       _______                _        16, 864.51
  The additional sum of $15,000 can be profitably expended during
the fiscal year ending June 30, 1936, and will be applied to mainte-
nanee  snagging and dredging between Wilmington and Fayetteville
with the Government derrick boat Northeast, between July 1 and
December 31, 1935, and March 1 and June 30, 1936.
                                    Cost and financial s nmary
                             MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934-------------------------- $1, 248, 200.90
Gst of maintenance to June 30, 1934------------------------    220, 186. 68
      Total cost of permanent work to June 30, 1934----------- 1, 468, 387. 58
Value of plant, materials; etc., on hand June 30, 1934----------      -53.58
      Net total expenditures -------------------------------- 1, 468, 334. 00
Unexpended balance June 30, 1934-----------------------------     16, 864.51
           Total amount appropriated to June 30, 1934-------------                               1, 485, 198. 51

           Fiscal year ending June 30            1930           1931          1932           1933         1934


Cost ofnew work_-
Cost of maintenance_-                         $13, 162. 39   $8, 457. 24   $13, 549. 90    $6, 391. 70   $5, 072. 49
Total expended-----------------------4, 895. 03              -1, 297. 71     3, 649. 63   -4, 336. 35    -4, 399. 55
Allotted           _-_                  _--    10, 500. 00    5, 000. 00 -13, 000. 00      7, 026. 73    -3, 058.45
            RIVERS :AND IARBORS--WILMINGTON,                                           N. C., DISTRICT                              395
Balance unexpended July 1, 1933- _____-- -. _s_-  __ --                                                                $15, 523. 41
Amount allotted from War Department Appropriation Act ap-
  proved Mar. 4, 1933                                                                                                       6, 300.00
      Amount         to be accounted for" -__- - ________--
                                                          - -     -_____                                                21, 823. 41
Deductions on        account of-
   Revocation         of allotment ----------    ___-----     $9, 076.62
   Revocation         of impounded funds ------------             281. 83
                                                                                                                              9,      45

      Net amount to be accounted for ..           __                                                                    12, 464. 96
Gross amount expended______________--_____________ $5, 943.80
Less:
    Reimbursements collected- -- ____--   $1, 266. 73
    Receipts from sales-- ----..----       9, 076. 62
                                                      10, 343.35
                                                                                                                       -4,    399. -5

         Balance unexpended June 30, 1934---------------------16, 864. 51

Amount (estimated) required to be appropriated for completion
of existing project ------------------------------------                                                               11,750. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1936, for maintenance __                                                                                      15, 000.00

                                          PUBLIO WORKS, FUNDS

Cost of new work to June 30, 1934________________________                                                              173, 654. 54
Cost of maintenance to June 30, 1934__________ ______

      Total cost of permanent work to June 30, 1934____                                                ___             173, 654. 54
Value of plant, materials, etc., on hand June 30, 1934                                  -------------                    5, 209. 74
      Net total cost to June 30, 1934--                         __-      ________________                              168, 444. 80
Minus accounts payable June 30, 1934                                                                                    43, 539. 65
     Net total expenditures ______________________124,
                               ---                                                                                          905.15
Unexpended balance June 30, 1934 _-------____-------                                                       -           995,094. 85
         Total amount appropriated to June 30, 1934___________                                                     1, 120, 000. 00

        Fiscal year ending June 30                     1930           1931                  1932               ;1933          1934


Cost ofnew work ---------  ------- ----------------- ---------------------
Cost ofmaintenance-..------------------------------ ----------
                                                           -   ------
                                                                              $173, 654. 4
                                                                         - _-I-- __4. --
                                                                                                                        i
Total expended ---                             __------------                ------------          -124,                           905. 1
Allotted--------------------    ------------------------                       ------------           ----      ------ 1,120, 000.06



Amount allotted from National Industrial Recovery Act approved
  June 16, 1933 ---------------------------------------        $1, 520, 000. 06
Deductions on account of revocation of allotment-----------__      400, 000. 00
      Net amount to be accounted for---------------------1,                                                            120, 000. 00
Gross amount expended -------     ______-            -____-______                                                      124, 905. 15
      Balance unexpended June 30, 1934______________________                                                           995, 094. 85
Outstanding liabilities June 30, 1934             $47, 444.82
Amount covered by uncompleted contracts --------- 535, 232.95
                                                                                                                       582, 677. 77

        SBalance available June 30, 1934-----------                                    ----------                      412, 417. 08
  SExclusive of available funds.
  2In addition $11,750 to be contributed by local interests.
396          REPORT OF CHIEF OF ENGINEERS,                                    U. S. ARMY, 1934

CONSOLIDATED          COST AND        FINANCIAL SUMMARY FOR CAPE FEAR RIVER,                                   ABOVE    WIL-
                                             MINGTON, N. C.

Cost of new work to June 30, 1934------------------------ $1,421, 855. 44
Cost of maintenance to June 30, 1934------------------------ 220, 186. 68

      Total cost of permanent work to June 30, 1934---------- 1,642, 042. 12
Value of plant, materials, etc., on hand June 30, 1934---------- -5, 263. 32
     Net total cost to June 30, 1934  ---------------------                                              1, 636, 778. 80
Minus accounts payable June 30, 1934-------------    -----                                                   43, 539. 65

      Net total expenditures ----------------------------                                                 1, 593, 239. 15
Unexpended balance June 30, 1934       -------------------------                                          1, 011, 959. 36

           Total amount appropriated to June 30, 1934-------------                                        2, 605, 198. 51

   Fiscal year ending June 30                1930               1931           1932             1933                1934


Cost of new work....----..----......---         -----------.--------                                  --- -.      $173, 654. 54
Cost of maintenance------------           $13, 162. 39          $8, 457. 24   $13, 549. 90       $6, 391. 70         5, 072. 49

       Total cost----------------          13, 162. 39          8,457. 24      13, 540. 90        6, 391. 70       178, 727. 03

Total expended-----------------             4, 895. 03       -1, 297. 71        3, 649. 63      -4, 336. 35        120, 505. 60

Allotted         ---------------           10, 500. 00         5, 000. 00     -13,    000. 00    7, 026. 73      1, 116, 941. 55



Balance unexpended July 1, 1933$---------------------------                                                     15, 523. 41
Amount allotted from War Department Appro-
  priation Act approved Mar. 4, 1933-----------    $6,300. 00
Amount allotted from National Industrial Recov-
   ery Act approved June 16, 1933--------------1, 520, 000. 00
                                                                                                          1, 526, 300. 00

Amount to be accounted for___________________
                                 -_____                                                                   1,541, 823. 41
Deductions on account of:
   Revocation of allotment ______________                                            $409, 076. 62
   Revocation of impounded funds-------------                                              281. 83
                                                                                                               409, 358. 45

      Net amount to be accounted for------------                                       -----             1, 132, 464.96
Gross amount expended----------------------                                          $130, 848. 95
Less:
    Reimbursements collected -----     $1, 266. 73
    Receipts from sales----------       9, 076. 62
                                                                                        10, 343. 35
                                                                                                               120, 505.60

      Balance unexpended June 30, 1934--- --    -------------                                            1, 011, 959. 36
Outstanding liabilities June 30, 1934   _            $47, 444. 82
Amount covered by uncompleted contracts--------      535, 232. 95
                                                                                                               582, 677. 77

           Balance available June 30, 1934-----------------------429, 281. 59

Amount (estimated) required to be appropriated for completion
of existing project 1-------------------------------------                                                     11, 750. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1936, for maintenance 1---- -----------------------                                                   15, 000. 00
                     22. NORTHEAST                  (CAPE FEAR)                 RIVER, N. C.
  Loation.-Rises in the northern part of Duplin County and flows
130 miles in a general southerly direction, emptying into the Cape
   xExclusive of available funds.
       RIVERS AND    HARBORS-WILMINGTON,        N.   C.P DISTRICT   397
Fear River at Wilmington, 30 miles above its mouth. (See U. S.
Coast and Geodetic Survey Chart No. 150.)
    Ewisting project.-This provides for a channel 22 feet deep and
150 feet wide, increased at entrances and on curves, from Hilton
railway bridge to a point 23/4 miles above the mouth of the river, and
for clearing the natural channel for small steamers, thence to Halls-
ville and for pole boats to Kornegays Bridge. Total length of
section, 103 miles. The tide ranges from about 21/2 feet at the mouth
of this stream but decreases to nothing a short distance above Ban-
nermans Bridge. The upper portion is subject to freshets of from 8
to 12 feet. The extreme range of lunar tides is 4.1 feet at mouth, 2.5
feet at Castle Hayne, and 2 feet at Smiths Bridge. The maximum
variation due to floods is 5 feet at mouth, 8 feet at Kornegays Bridge,
and 13 feet at Bannermans Bridge. The estimate of cost for new
work, revised in 1930, is $61,400, of which local interests are to
contribute $25,375. The latest (1919) approved estimate for annual
cost of maintenance is $5,000.
    The existing project was adopted by the following river and harbor
acts: The act of September 19, 1890, provided for clearing the natural
channel (H. Ex. Doc. No. 35, 51st Cong., 1st sess., and Annual Report
for 1890, p. 1181); and the act of March 2, 1919, provided for the
22-foot channel (H. Doc. No. 1356, 62d Cong., 3d sess.). The latest
published map of the whole stream is in House Document No. 35,
Fifty-first Congress, first session, and the latest map of the lower
23% miles is in House Document No. 1356, Sixty-second Congress,
third session.
   Local cooperation.-The River and Harbor Act of March 2, 1919,
requires that local or other interests contribute one-half the cost of
the 22-foot channel authorized by the act of March 2, 1919, viz,
 $25,375. Local interests have not yet contributed these funds.
   Terminal facilities.-The wharves on the portion of the river under
improvement by the United States number six, all of which are just
above Hilton Bridge. They have a total frontage of about 733 feet.
The water terminals are considered adequate.
   Operations and results during fiscal year.-The work was done
by Government plant and hired labor and consisted of snagging
with derrick boat Northeast. The river was cleared of obstruc-
tions between points 40 and 69 (niles above the mouth. The costs
were $2,737.02 and the expenditures were $2,687.02, all for
maintenance.
   Condition at end of fiscal year.-The clearing of the natural chan-
nel was completed in 1896. No work has been done on the 22-foot
channel. The entire project is about 22 percent completed. The
river is in fair condition to Bannermans Bridge, 48 miles above
the mouth. The governing low water depths are 15 feet to a point
2,3 miles above the mouth; thence 6 feet to Bannermans Bridge,
48 miles above the mouth, and thence 3 feet to Crooms Bridge, 56
miles above the mouth. Above Crooms Bridge the river is navigable
during freshets only, which are liable to occur any month in the
year. The work remaining to be done to complete the project is
to dredge the channel 22 feet deep and 150 feet wide, increased at
entrances and on curves, from Hilton railway bridge to a point 23,
398       REPORT OF CHIEF OF ENGINEERS,                               U. S. ARMY,                 1934

miles above the mouth of the river. The cost has been $10,687.96
for new work and $55,051.17 for maintenance, a total of $65,739.13.
The expenditures were $65,689.13.
  Proposed operations.-The balance unexpended July 1, 1934,
$3,875.17, will be applied to maintenance snagging between the
mouth and Hallsville, 88 miles above, with the Government derrick
boat Northeast about 21/2 months, between October 16 and 31, 1934,
and May 1 and June 30, 1935.
  The additional sum of $3,000 can be profitably expended during
the fiscal year ending June 30, 1936, and will be applied to mainte-
nance snagging between the mouth and Hallsville, with the derrick
boat Northeast during January and February 1936.
                                    Cost and financial summary
Cost of new work to June 30, 1934----------------------------- $10, 687. 96
Cost of maintenance to, June 30, 1934------------------------55, 051. 17
      Total cost of permanent work to June 30, 1934____----        65, 739. 13
Value of plant, materials, etc., on hand June 30, 1934------------    -- 50. 00
        Net total cost to June 30, 1934__                      -------                     _                65, 689. 13

Net total expenditures             --       -------                                                         65, 689. 13
Unexpended balance June 30, 1934--------------------------                                                   3, 875. 17
        Total amount appropriated to June 30, 1934--                                                        69, 564. 30

        Fiscal year ending June 30                 1930        1931             1932            1933              1934

Cost of new work ._ ....--         - - -- -.---              $2,-                       ---.       ---
                                                                                                   --         -
Cost of maintenance     __                     $1, 685. 73   $2, 938. 93 -_         -      $1, 209. 85         $2, 737.02

Total expended_       ----------------------- 1, 685. 73      2,938. 93    -__--_              1,209. 85          2, 687. 02
Allotted------------------------------2, 000. 00              1, 500. 00       -$2, 500        1, 128. 38         6, 273. 72

Balance unexpended July 1, 1933---------------------------------$288.        47
Amount allotted from War Department Appropriation Act
  approved Apr. 26, 1934-------------------------- $1, 600.00
Amount allotted from War Department Appropriation Act
  approved Mar. 4, 1933_    -      -      -       -       4, 800. 00
                                                                     6, 400. 00

      Amount to be accounted for-------------                    6, 688. 47
Deductions on account of revocation of impounded funds----------    126. 28
      Net amount to be accounted for                                                                            562. 19
                                                                                                             6-------------------------,
Gross amount expended_                                                                                       2, 687. 02
        Balance unexpended June 30, 1934------------------__                                                 3, 875. 17
Amount (estimated) required to be appropriated for completion of
existing project  _                      ---------------        25, 375. 00

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance ----------------------------_                                                     3, 00.00
                                     23. BLACK RIVER, N. C.
  Location.-This river rises in Sampson County, flows 175 miles
in a general southeasterly direction, and empties into Cape Fear
River 14 miles above Wilmington and 44 miles above the mouth.
  1Exclusive of available funds.
   In addition $25,375 is to be contributed by local interests.
       RIVERS AND HARBORS-WILMINGTON,               N.   C., DISTRICT       399
   Existing project. This provides for clearing the natural channel
and banks to Clear Run, 66 miles, and cutting off sharp bends. The
tidal range is about 11/2 feet at the mouth and decreases to nothing
30 miles above. The low-water stages prevail usually from May
until August, inclusive; during the rest of the year the stage is
about 5 to 8 feet higher; but the periods of high and low water are
by no means the same every year. The extreme range of lunar tide
is 2.3 feet at the mouth and 1.2 feet at Point Caswell. The maxi-
mum variation due to floods or freshets is 5 feet at the mouth, 15
feet at Point Caswell, and 19 feet at Clear Run. The estimate of
cost for new work, made in 1893, was $13,000. The latest (1928)
approved estimate for annual cost of maintenance is $3,000.
   The existing project was adopted by the River and Harbor Act
of August 5, 1886 (Annual Report for 1885, pp. 1145-1154, as
amended by Annual Report for 1893, p. 1407). No map of this
stream has ever been published.
   Terminal facilities.-No wharves exist on this river. Boats use
natural landings or prepare landings by smoothing out the roughness
and irregularities of the banks. No terminals are deemed necessary.
   Operations and results during fiscal year.-The work was done by
Government plant and hired labor and consisted of snagging with
the derrickboat Northeast. The river was cleared of obstructions
between points 24 and 40 miles above the mouth. The cost was
 $1,057.06, all for maintenance. The expenditures were $1,012.10.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1895 at a saving of $642 under the estimated cost. The
controlling low water depths are 5 feet to Point Caswell, 24 miles
above the mouth, 212 feet to Hawes Narrows, 32 miles above the
mouth and 11/2 feet to Clear Run, the head of navigation and 60.
miles above the mouth. The cost has been $12,358.40 for new work
and $36,071.85 for maintenance, a total of $48,430.25. The expendi-
tures were $48,385.29.
  Proposed operations.--The balance unexpended July 1, 1934,.
$3,535.27, will be applied to maintenance snagging between the mouth
and Clear Run, 66 miles above, with the Government derrick boat
Northeast about 2 months during September 1934 and January 1935.
   The additional sum of $3,000 can be profitably expended during
the fiscal year ending June 30, 1936, and will be applied to mainte-
nance snagging between the mouth and Clear Run with the derrick
boat Contentnea during July and December 1935.
                          Cost and financial summary

Cost of new work to June 30, 1934-         ___                       $12, 358. 40
Cost of maintenance to June 30, 1934                                  36, 071. 85

      Total cost of permanent work to June 30, 1934 ----------- __    48, 430. 25
Value of plant, materials, etc., on hand June 30, 1934__                 -44. 96

      Net total cost to June 30,. 1934_                               48, 385. 29

Net total expenditures------------------------                        48, 385. 29
Unexpended balance June 30, 1934_                                      3, 535. 27

      Total amount appropriated to June 30, 1934-                       51, 920. 56
      91536-ENG 1934--26
400           REPORT OF CHIEF OF ENGINEERS                                             U.    S. ARMY,         1934


          Fiscal year ending June 30                             1930          1931            1932         1933             1934


Cost of newwork...----                   -------                        -----------------------------       ----        - ----------
Cost of maintenance---------------------                       $1, 327. 61      $44.00 ------------       $1, 548. 99       $1, 057. 06
Total expended..--.---- ------------------                      1, 327. 61      635. 38 ------------       1, 548. 99        1, 012. 10

Allotted-------------------                  --------     --    1, 303. 45    1, 500. 00        -2, 500    1,184. 37         4, 547. 37

Amount        allotted from War Department Appropriation Act approved
Apr.        26, 1934----------         ----------------------------- $800. 00
Amount        allotted from War Department Appropriation Act approved
Mar.        4, 1933      ------------------------------------------- 3, 800.00

     Amount to be accounted for--------------------                                                                      4,600.00
Deductions on account of revocation of impounded funds                                                ----------            52. 63

      Net amount to be accounted for __   __________---___                                                          __ 4, 547. 37
Gross amount expended _____________________________-                                                                   1, 012. 10

    Balance unexpended June 30, 1934----------------------3, 535.27
Amount that can be profitably expended in fiscal year ending June
    30, 1936 for maintenance 1-__--                                          __----_                                     3, 000. 00

24. OPERATING AND CARE OF LOCKS AND DAMS NOS. 1 AND 2, CAPE
                                                        FEAR RIVER, N. C.

   The improvement for which report is made under this caption
forms part of the project for Cape Fear River, N. C., above Wil-
mington. ( See pp. 391 to 400 of this report, where general informa-
tion regarding the improvement can be found.) The completed
locks and dams have been operated and maintained under the per-
manent indefinite appropriation since November 1, 1916, for Lock
No. 1, and March 1, 1918, for Lock No. 2.
   Operations and results during fsecal year.-The structures were
operated and maintained in satisfactory condition. The cost was
$4,240.18. The expenditures were $4,205.19.
   Condition at end of fiscal year.-In connection with providing a
reliable 8-foot channel to Fayetteville, Lock and Dam No. 1 is being
raised 3 feet and Lock and Dam No. 2 is undergoing repairs and are
not now being operated. A fairly good channel, 19 feet deep at low
water, exists from Wilmington to a point 9 miles above; 7 feet to
Lock and Dam No. 1, 39 miles above; 3 feet to Lock and Dam No. 2,
71 miles above; and 2 feet to Fayetteville, 115 miles above and the
head of navigation. The amount expended for operation and care to
June 30, 1934, was $166,014.75.
   Proposed operations.-The locks and dams will be operated and
maintained under allotments from appropriations made available
for such purposes.
                          Cost and financial summary
Cost of maintenance to June 30, 1934__----------__-------------__$166, 156. 13
Value of plant, materials, etc., on hand June 30, 1934 __--------   - -- 4. 50
      Net total cost to June 30, 1934------------ ------------                                                       166, 151. 63
Minus accounts payable June 30, 1934_--------__    -   -- __
                                                ______--                                                             -    136. 88
      Net total expenditures   __----- ____-----____                                                                    166, 014. 75
Unexpended balance June 30, 1934--------------                                                                --         1, 910. 81
           Total amount appropriated to June 30, 1934-                                                                  167, 925. 56
    'Exclusive       of available funds.
               RIVERS AND HARBORS-WILMINGTON,                                      N. C., DISTRICT                    401

           Fiscal year ending June 30                    1930          1931          1932           1933            1934


Cost of new work___-------------------------------
-Cost of maintenance_                                  $9, 521. 67   $7, 461. 41   $6, 434. 67   $16, 323. 06      $4, 240. 18

Total expended ------------------------                 9, 309. 07   11, 239. 79    6, 473. 37    16, 667. 97       4, 205. 19

Allotted----------------              --------------    7, 500. 00   10, 500. 00   10, 000.00     15, 751.79        2, 086. 63



Balance unexpended July 1, 1933__________________________________ $4, 029. 37
Amount allotted from permanent indefinite appropriation, section 6,
River and Harbor Act, Mar. 3, 1909----------------------___        2, 300. 00

      Amount to be accounted for____                                                                   -__       6,6______-________
                                                                                                                     329. 37
Deductions on account of revocation of impounded funds                                   -----------               213. 37

      Net amount to be accounted for_________________________                                                    6, 116.00
Gross amount expended -----------------------------------------                                                  4, 205. 19

      Balance unexpended June 30, 1934 _________________________                                                 1, 910. 81
Outstanding liabilities June 30, 1934______________________________                                                 136. 88

     Balance available June 30, 1934                                                                             1__________________
                                                                                                                    773. 93
Amount allotted for fiscal year 1935____________________________                                                 7, 900. 00

           Balance available for fiscal year 1935___________________                                             9, 673. 93

   25. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                     (GENERAL)

   The cost of work during the year amounted to $10,911.39; the
expenditures were $10,904.62. The balance unexpended June 30,
1934, will be applied as needed during the fiscal year 1935 to pay-
ment of expenses incurred in connection with the above items. The
additional sum of $15,000 can be profitably expended during the
fiscal year ending June 30, 1936.
                                           Cost and financial summary

Cost of maintenance to June 30, 1934_____________________________ $44, 278. 92
Value of plant, materials, etc., on hand June 30, 1934                 -6. 77

          Net total cost to June 30, 1934____________________________                                           44, 272. 15

Net total expenditures___________________________                                                               44, 272. 15
Unexpended balance June 30, 1934______________________________                                                  13, 601. 78
          Total amount appropriated to June 30, 1934_________________                                           57. 873. 93

           Fiscal year ending June 30                    1930          1931          1932           1933            1934

Cost of new work     ----------------   -        --- -------------------------------       i-
Cost of maintenance__------------------- $7, 153. 14   $5, 558.45   $8,091.20   $9, 667.53    $10,911.39
Total expended---             -------------------      6, 973. 23    5, 738. 36    8,091. 20       9, 667. 53      10, 904. 62
Allotted ---------------------------------             6, 500. 00    4, 000. 00    5, 200.00       9, 667. 53      24, 506.40
402         REPORT OF CHIEF OF ENGINEERS,                                 U.   S. ARMY,            1934

Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934-----------------------------------------        $11, 000. 00
Amount allotted from War Department Appropriation Act approved
Mar. 4, 1933 -----------------------------------               14, 000.00

     Amount to be accounted for______--   _______-_______-__                                                25, 000. 00
Deductions on account of revocation of impounded funds----------                                                493. 60

      Net amount to be accounted for                                                                        24, 506. 40
Gross amount expended______ __.-____------                                              $17, 522.46
Less reimbursements collected-     -                                                           617. 84
                                                                                          6,6---------
                                                                                                            10, 904. 62

        Balance unexpended June 30, 1934---------------------                                               13, 601. 78

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1--------------------------------15,                                                  000. 00

               26. Other projects for which no estimates are submitted

           [Commercial statistics for these projects are given in part 2 of report]

                                                          For last       Cost and expenditures to            Estimated
                                                           fullre-             June 30, 1934re-
                    Name of project                       port
                                                          Annualsee            June 30, 1934                 amount   re-
                                                                                                              quired to
                                                          Report         New work Maintenance                 complete
                                                            for-

1. Bay River, N. C.--------------------------               1923         $22, 729. 76        $4, 170. 24      Completed
2. Smiths Creek, N. C.1 2_        ______       ______ _     1922          14, 471. 80            254. 24         $1, 800
3. Shallotte River, N. C. 1-........__........              1933          18, 181. 37         6, 467. 81      Completed

  1 Channels adequate for commerce.
  2Abandonment recommended in H. Docs. No. 59, 64th Cong., 1st sess., and No. 1848, 65th Cong.,
3d sess.

    Status of reports called for by river and harbor acts and committee resolutions


        Locality              Authorization act      Transmitted
                                                     to Congress               Document no.                Recommenda-
                                                                                                           Recommenda


Beaufort to Jacksonville,   River and Harbor Act,    Aug. 28, 1934 ----------------                  _ Favorable.
  N. C., inland water-       July 3, 1930.
  way, via Craigs Point,
  Salliers Bay, Howard
  Bay, New River,
  Ware Landing, and
  Richlands, N. C.
Neuse River, N. C.,          _do ...........
                             ...    ___             July       6, 1933 -----------------            -      Unfavorable.
  from New Bern to
  Goldsboro, N. C.
South Creek, N. C-_    Rivers and Harbors
                         Committee resolu-
                         tion Feb. 3, 1934.
Tar River, N. C., be- Rivers and Harbors
tween      Washington   Committee resolu-
and Greenville.         tion Feb. 27, 1934.
Wrightsville Beach, N. River and Harbor Act,         Jan.      9, 1934    House, 218, 73d Cong.,              Do.
C., Beach erosion.      July 3, 1930.                                     2d sess.

  1Exclusive       of available funds.
         RIVERS AND HARBORS          CHARLESTON,      S. C.,   DISTRICT      403

IMPROVEMENT OF RIVERS AND HARBORS                                       IN THE
         .CHARLESTON, S. C., DISTRICT
   This district includes the watersheds of all rivers flowing into the
ocean on the coast of South Carolina, northeast of Port Royal Sound.
It embraces the central portion of North Carolina and all of South
Carolina except Beaufort, Broad, and Savannah River Basins, in-
cluding the portion of the intracoastal waterway from Cape Fear
River, N. C., to Winyah Bay, S. C., south of Little River, S. C.
   District engineer: Maj. Gilbert Van B. Wilkes, Corps of Engi-
neers, to November 23, 1933, and Col. W. G. Caples, Corps of
Engineers, since that date.
   Division engineer: Col. T. H. Jackson, Corps of Engineers, to
June 28, 1934, and Col. Earl I. Brown, Corps of Engineers, since that
date.
                                  IMPROVEMENTS

1 Intracoastal waterway, Cape                                                Page
     Fear River, N. C., to Win-    Page    7. Charleston Harbor, S. C____     416
    yah Bay, S. C                   378    8. Ashley River, S. C---------     421
2. Winyah Bay, S. C----------       403    9. Shipyard River, S. C--__-__     423
3. Waccamaw River, N. C., and             10. Waterway from Charleston
    S. C_______________     ___     406         to Beaufort, S. C------__     425
4. Great Peedee River, S. C __      408   11. Examinations, surveys, and
5. Waterway from Winyah Bay                     contingencies (general)__     427
    to Charleston, S. C-------      410   12. Other projects for which no
6. Operating and care of lock                  estimates are submitted__      428
     and dam across Congaree
    River, S. C-_                   415

1. INTRACOASTAL      WATERWAY        FROM       CAPE FEAR      RIVER,   N. C., TO
    WINYAH, BAY, S. C., SECTION SOUTH OF LITTLE RIVER, S. C.

  For report on this improvement see page 378.
                          2. WINYAH BAY, S. C.

   Location.-This bay lies on the coast of South Carolina, 50 miles
northeast of Charleston Harbor and 90 miles southwest of the en-
trance to Cape Fear River, N. C. (See U. S. Coast and Geodetic
Survey Chart No. 428.)
   Previous projects. Adopted by acts of August 2, 1882, and
August 5, 1886. Total cost and expenditures amounted to $2,560,-
408.22, of which $2,445,851.85 was for new work and $114,556.37 was
for maintenance. For further details see page 1806 of Annual
Report for 1915.
   Existing project.-This provides for a channel 400 feet wide and
18 feet deep at mean low water from the entrance of Winyah Bay,
following the western shore as far as may be necessary, to a point
on the Sampit River 1 mile above the limits of the city of George-
town, to be secured and maintained (a) by the construction of two
jetties springing, respectively, from North and South Islands and
converging to give an opening 4,800 feet wide at the 18-foot curve
on the seaward side of the bar, the jetties to be of stone on brush
mattresses, the north jetty having a length of 11,139 feet and the
south jetty 21,051 feet; (b) by dredging across the bar to the 18-foot
curve indicated; (c) by construction of an earthen dike 14,300 feet
long to protect the shore line of South Island at the southerly side
404    REPORT OF   CHIEF OF ENGINEERS,      U.   S. ARMY,   1934


of the bay; (d) by dredging in the bay proper, following the south-
western shore for a distance of about 6 miles opposite Mud Bay;,
 (e) by the construction of a training wall at the head of this dredged
cut; and (f) by dredging in Sampit River opposite the city of
Georgetown and across the bar at the mouth of the river. The mean
range of tide at Georgetown is 3.3 feet, while the spring tides have
a mean rise and fall of 4 feet.
   The estimate of cost for new work, made in 1904, is $650,000,
exclusive of amounts expended on previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $46,000.
   The existing project was authorized by the following river and
harbor acts: The act of August 5, 1886, provided for the jetties
 (H. Ex. Doc. No. 258, 48th Cong., 2d sess., reprinted on pp. 1154-
1170 of the Annual Report for 1885, and H. Ex. Doc. No. 117, 50th
Cong., 2d sess., reprinted on pp. 1110-1115 of the Annual Report for
1889). Under this same act the earthen dike was provided as a
measure of protection for the south jetty. The act of June 25, 1910,
provided for the present channel dimensions and the training wall
 (H. Doc. No. 398, 58th Cong., 2d sess., reprinted on pp. 1591-1609
of the Annual Report for 1904). For latest published map see
Annual Report for 1915, page 2394.
   Terminal facilities.-The terminal facilities at the port of George-
town served by this improvement consist of five wharves of ordinary
timber construction, suitable for ocean-going vessels and a number
of smaller wharves and landing places. They are considered
adequate for the present commerce of the port.
   Operations and results during fiscal year.-The U. S. dredge
Comstock removed 847,824 cubic yards of sand, mud, and silt from
the Western Channel in restoring project depth for a width of 100
feet. The Comstock removed from the Sampit River Bar 316,356
cubic yards of sand, mud, and silt in increasing the controlling depth
to 20 feet for a width of 170 feet. Using the snagboat Wateree and
hired labor, repairs were made to the Sampit River training wall for
a distance of 1,140 feet, and to the Western Channel training wall
for 3,700. An experiment at the United States Waterways Experi-
ment Station at Vicksburg, Miss., was made to determine the method
of channel maintenance and location most desirable.
   The costs during the year were $18,725.95 for dredging in the
Western Channel and the Sampit River Bar, $12,682.35 for driving
piling and placing fascines in Sampit River and Western Channel
training walls, all by Government plant and hired labor; $2,897.74
for maintenance of Sampit Wharf and floating plant; and $4,555.66
for laboratory study; a total of $38,861.70, all chargeable to
maintenance.
   The total expenditures during the year were $22,573.38.
   Condition at end of fiscal year.-The project is 80 percent com-
pleted. The jetties were completed in 1903-4. The crest elevations
vary from 3 to 5 feet below their original heights. Dikes of various
forms have been built to protect the South Island Beach and the
shore end of the south jetty. The channels prescribed in the project
have been reported as obtained at different times, but never com-
pletely maintained.
   The Sampit River entrance is protected on the eastern side by a
timber and brush training wall 2,000 feet long. A survey of this
         RIVERS AND HARBORS-CHARLESTON,                  S. C., DISTRICT            405

bar made in June 1934 showed a controlling depth of 13.6 feet for
a width of 400 feet; the remainder of the channel has project depth,
with widths ranging from project width to slightly less. The West-
ern Channel is partially protected on its east side by timber and
brush training walls for a distance of 20,000 feet. A survey of the
channel made in June 1934 showed that there is a controlling depth
of 16 feet at mean low water for a width of 150 feet. The work
remaining to be done to complete the project is the construction of
a permanent training wall springing from Frazier Point at the upper
end of Western Channel.
   The total cost to date amounts to $491,200.73 for new work and
$958,451.99 for maintenance, a total of $1,449,652.72. The total
expenditures were $1,441,202.42.
   Proposed operations.-The balance unexpended and accounts re-
ceivable, July 1, 1934, $24,241.77, will be applied as follows:
Accounts payable, July 1, 1934_______________________________         $3,730.68
Maintenance:
    Dredging Western Channel and channel in the mouth of Sampit
      River, with U. S. hopper dredge Comstock, Apr. 1-24, 1935____ 12,000.00
    Maintenance and operation of the United States Engineer
      wharf and storehouse at Georgetown, S. C., including repairs
      to bulkhead in boat slip, with hired labor, July 1, 1934-June
      30, 1935    -------------------------------------------          4, 400. 00
    General supervision of the project, July 1, 1934-June 30, 1935___ 4, 111. 09
      Total for all work________________
                           --                            ________24,              241. 77
  The additional sum of $39,000 can be profitably expended during
the fiscal year ending June 30, 1936, as follows:
Maintenance:
   Dredging Western Channel and Sampit bar by U. S. hopper dredge
      Comstook and hired labor, Apr. 1-20, 1936_ _____         _______ $10, 000
   Dredging the entrance channel to Winyah Bay, S. C., by the U. S.
      hopper dredge Comstock and hired labor, Apr. 21-May 21, 1936___ 15, 000
   Repairs and additions as may be found necessary to the pile
      and brush training walls in Western Channel and Sampit bar,
      with snag boat Wateree and hired labor, Sept. 1-Oct. 31,
      1935    __ _-          _______-________________                    9, 000
   Maintenance and operation of the U. S. Engineer wharf and
      storehouse at Georgetown, S. C., with hired labor, July 1, 1935-
      June 30, 1936---------------------------------------               2, 400
   General supervision of the project, July 1, 1935-June 30, 1936....    2, 600

      Total-------------__     -------------------------------           ---      39, 000

                             Cost and financial summary
                                                   -
Cost of new work to June 30, 1934_______________----                   $2, 937, 052. 58
Cost of maintenance to June 30, 1934_____________ -----      .          1, 073, 008.36

      Total cost of permanent work to June 30, 1934      ----------     4, 010, 060. 94
Value of plant, materials, etc., on hand June 30, 1934_____-- -            -- 6, 757. 42

                                       ----
      Net total cost to June 30, 1934.____________              ___     4, 003, 303. 52
Plus accounts receivable June 30, 1934______------ - -        ____           2, 037. 80

     Gross total costs to June 30, 1934-__         --------             4, 005, 341. 32
Minus accounts payable June 30, 1934_                      -      -
                                                        -_______----         3, 730. 68

      Net total expenditures -------------------------                  4,001, 610. 64
Unexpended balance June 30, 1934_ _____.-----.-----------                      22, 203.97
      Total amount appropriated to June 30, 1934-                       4, 023, 814. 61
406        REPORT OF CHIEF OF ENGINEERS,                                 U.    S.    ARMY,        1934


        Fiscal year ending June 30                1930           1931            1932           1933            1934

Cost of new work................    .------------
Cost of maintenance------------------ $35, 405. 06 $62, 757. 42               $38, 526. 24   $48, 023. 18     $38, 861. 70
Total expended_------- ---.---            _
                                      -----      36, 910. 62   51, 042. 67     45, 279. 63    43, 228. 44      22, 573. 38
Allotted...........-----
               ___..__ __        --           _ 31, 000. 00    46, 500. 00     20, 000. 00    83, 047. 24       4, 758. 36

Balance unexpended July 1, 1933---------------------------$40, 018.99
Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934-----------------------------------------------19, 600. 00
     Amount to be accounted for    ---------------------------                                              59, 618. 99
-Deductions on account of-
    Revocation of allotment---------------------- $14, 261. 79
    Revocation of impounded funds-------------------    579. 85
                                                                                                            14, 841. 64

       Net amount to be accounted for------------------------                                               44, 777. 35
'Gross amount expended-------------------------$50, 780.85
Less reimbursements collected---------------------28, 207. 47
                                                                                                            22, 573. 38

      Balance unexpended June 30, 1934----------------------   22, 203.97
Outstanding liabilities June 30, 1934--------------------------4, 366. 68
      Balance available June 30, 1934-----------------------                                                17, 837. 29
Accounts receivable June 30, 1934----------------------------2,                                                 037. 80
      Unobligated balance available June 30, 1934-------------- 19, 875. 09
Amount (estimated) required to be appropriated for completion of
existing project 1---    --- ------------------------------      158, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1936 for maintenance --------------------------------         39, 000. 00
                        3. WACCAMAW RIVER, N. C. AND S. C.
    Location.-This river rises at Lake Waccamaw, N. C., and flows
:southwest 142 miles into Winyah Bay, near Georgetown, S. C. (See
U. S. Coast and Geodetic Survey Chart No. 152.)
    Existing project.-This provides for a channel 12 feet deep at
low water, with 80 feet bottom width, from the mouth of the river
to Conway, nearly 44 miles; thence a channel 4 feet deep at low water
and 50 feet wide to Red Bluff, 26 miles above Conway; thence a
cleared channel to Lake Waccamaw. The usual seasonal variation
in water surface is about 7.5 feet at Conway and about 12 feet at
:Star Bluff, 80 miles above the mouth. The tidal variation in Winyah
Bay is 3.3 feet and at Conway at low-water stage it is 1.6 feet.
    The estimate of cost for new work, revised in 1930, was $262,800,
'The latest (1930) approved estimate for annual cost of maintenance
is $4,500.
    The existing project was adopted by the following river and
harbor acts: The act of June 14, 1880, provided for the 12-foot
channel with 80 feet bottom width to Conway and a cleared channel
from Conway to Lake Waccamaw. (S. Ex. Doc. No. 117, 46th Cong.,
2d sess., and Annual Report for 1880, p. 848) ; and the act of July 3,
1930, provided for the channel 4 feet deep at low water and 50 feet
wide from Conway to Red Bluff (H. Doc. No. 82, 70th Cong., 1st
sess.). For map of the river see House Document No. 514, Fifty-
eighth Congress, second session, and the last-mentioned document.
   'Exclusive of available funds.
          RIVERS AND HARBORS-CHARLESTON,                         S. C.,   DISTRICT     407

   Recommended modifications of project. Recommendation has
been made to Congress that the project be modified by eliminating
all work between Star Bluff and Lake Waccamaw (H. Doc. No. 467,
69th Cong., 1st sess.).
   Terminal facilities.-At Toddville and at Conway there are
wharves and warehouses, which are free and open to all carriers.
At intermediate landings there are privately owned free wharves
The terminals are adequate for the existing commerce.
   Operations and results during fiscal year.-The U. S. snag boat
Wateree removed 24,779 cubic yards of sand and mud in restoring
project dimensions below Conway, S. C., and removed trees and snags
from the river at Savannah Bluff and Bull Creek and a sunken
wrecked lighter at Conway, S. C.
   The costs during the year were $5,919.81 for dredging between
the mouth and Conway, $121.60 for snagging at Savannah Bluff and
Bull Creek, and $142.53 for surveys, a total of $6,183.94, all charge-
able to maintenance.
   The total expenditures were $6,363.01.
   Condition at end of fiscal year.-The 12-foot project channel to
Conway was completed in 1924 and obtains for the entire distance.
The project width does not hold the entire distance. In the 4-foot
channel from Conway to Red Bluff, the channel has project dimen-
sions to Sessions Landing, mile 56.5; from Sessions Landing to Red
Bluff sand bars have formed limiting the controlling depth to 2.8
feet at low water for a width of 30 feet. Above Red Bluff (mile
72.5), no work having been done for several years, the channel is
obstructed by logs and snags and cannot be navigated safely.
   The costs to date amount to $262,813.58 for new work and:
$112,139.94 for maintenance, a total of $374,953.52.
   The total expenditures to date amount to $375,132.59.
   Proposed operation.-The balance unexpended and accounts
receivable July 1, 1934, $13,864.28, will be applied as follows:
Accounts payable, July 1, 1934------------------------------------     $90. 9
Maintenance: Removing obstructions in the form of overhanging
trees, buried logs, and sand bars, from Conway, S. C., mile 44,
to Red'Bluff, S. C., mile 69, with the U. S. snag boat Wateree
and hired labor, October 1934-February 1935                        3,773.35
                                                                   1--------------_

      Total-------------        ------------------------------                   13, 864. 28
  The additional sum of $4,500 can be profitably expended during
the fiscal year ending June 30, 1936, in maintenance snagging from
mile 29, 15 miles below Conway, to Red Bluff, S. C., mile 69.
                           Cost and financial summacry
Cost of new work to June 30, 1934------------------------- $262, 813. 58
Cost of maintenance to June 30, 1934------------------------112, 139. 94

      Total cost of permanent work to June 30, 1934------------   374, 953. 52
Plus accounts receivable June 30, 1934 --------------------------      270. 00
      Gross total costs to June 30, 1934-----------------------                 375, 223.52
Minus accounts payable June 30, 1934                                                  90. 93
     Net total expenditures------------_
                              _375,                   _..                            132. 59
Unexpended balance June 30, 1934--
                                ...                                              13, 594.28
      Total amount appropriated to June 30, 1934 ------------ 388, 726. 87
408          REPORT            OF CHIEF OF ENGINEERS,                            U.       S.     ARMY,        1934


          Fiscal year ending June 30                        1930          1931              1932           1933            1934


Cost of new work  -------------------------- $12, 500. 00                             -
Cost of maintenance------------------ $169. 77 7, 345. 52                                   $154. 48     $5, 469. 58      $6, 183. 94
       Total cost_         .           _---------------------_169. 77   19, 845. 52             154.48    5, 469. 58       6, 183. 94
Total expended---------------------                          169. 77    16, 950. 61        3, 049. 39     5, 469. 58       6, 363. 01
Allotted ----           ------------------- _              4, 000. 00   16, 000. 00       ---            11, 942. 74      13, 484. 13



Balance unexpended July 1, 1933______________________________  $6, 473.16
Amount allotted from War Department Appropriation Act approved
  Apr. 26, 1934      ._________         _________              13, 500. 00

      Amount to be accounted for_______________________________                                                         19,973.16
Deductions on account of revocation of impounded funds-                                                                     15. 87

      Net amount to be accounted for__________________---                                                         _ 19, 957.29
Gross amount expended______________________                                                                          6, 363.01

      Balance unexpended June 30, 1934______________________                                                           13, 594.28
                                          ----------------
Outstanding liabilities June 30, 1934_--__--______                                                                          92. 73

          Balance available June 30, 1934______________-------                                                         13, 501. 55
Accounts receivable                   June 30, 1934 _________________------                                               270. 00

          Unobligated balance available June 30, 1934________________                                                  13, 771.55

Amount that can be profitably, expenrded in fiscal year ending- June
                            -- ----- ---- ----- ---- ----- ----- -
30, 1936 for maintenance 1________________________                _                                                    4, 500.00

                                      4. GREAT PEEDEE RIVER, S. C.

   Location.--Rises in the mountains of North Carolina and flows
generally southeast for 435 miles into Winyah Bay, near George-
town, S. C. Above the Uharie River, 233 miles from the mouth, it is
called the Yadkin. (See U. S. Geological Survey map of South
Carolina, 1913.)
   Existing project.-This provides for a cleared 9-foot channel be-
tween Waccamaw River and Smiths Mills and thence a 31/2-foot
channel to Cheraw at all stages of water. The tidal variation at
low-water stage is 3.3 feet at the mouth and 3 inches 34 miles above.
The ordinary flood stage is 18 feet above the low-water stage at
Smiths Mills, 17 feet at Atlantic Coast Line Railroad bridge, and
27 feet at Cheraw Bridge, respectively 52, 103, and 167 miles from
the mouth.
   The estimated cost for new work, revised in 1900, was $235,345.
The latest (1900) approved estimate for annual cost of maintenance
is $5,000.
   The existing project was authorized by the following river and
harbor acts: The act of June 14, 1880, provides for the removal of
all obstructions so as to secure a navigable depth of 9 feet to Smiths
Mills and 3 /2 feet to Cheraw (S. Ex. Doc. No. 117, 46th Cong., 2d
sess., and Annual Report for 1880, p. 844) ; the act of June 13, 1902,
provides for securing a 3/ 2 -foot channel between Cheraw and the
Atlantic Coast Line Railroad bridge by means of dredging, snag-
ging, and the construction of timber and pile dams (H. Doc. No. 124,
   1Exclusive       of available funds.
             RIVERS               AND HARBORS-CHARLESTON,                       S.     C., DISTRICT              409
56th Cong., 2d sess.). For map see Annual Report for 1889, page
1180.
   Recommended modifications of project. Recommendation has
been made to Congress that the project be modified by elimination
of all work between Jeffreys Creek and Cheraw. (H. Doc. No. 647,
69th Cong., 1st sess.)
   Terminal facilities.-There are practically no terminal facilities,
except small sheds constructed at a few landings as a protection to
freight. They are privately owned.
   Operations and results during fiscal year.-The U. S. snag boat
Wateree removed obstructions in Bull Creek between miles 24 and
30 to restore project dimensions from the mouth via Bull Creek to
the mouth of Jeffreys Creek, mile 89.
   The total costs during the year were $37.50 for removing obstruc-
tions, office expenses, etc., all chargeable to maintenance.
   The total expenditures were $327.45.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1909 at a saving of $51,633 under the estimated cost. There
exists from the Waccamaw River via Bull Creek to mile 52 a
cleared channel 9 feet deep at lowest recorded stage. It is navigable
to boats drawing 31/2 feet at all stages of water to Jeffreys Creek
 (mile 89). Above Jeffreys Creek the river cannot be safely navi-
gated because of many snags and sunken logs.
   The total costs to date amount to $183,712.41 for new work and
$183,473.06 for maintenance, a total of $367,185.47. The total
expenditures were $367,185.47.
   Proposed operations.-The balance unexpended July 1, 1934,
$5,000, will be applied to maintenance dredging at the mouth of Bull
Creek, mile 29.5, and to snagging from the mouth of Lynches
River, mile 63, to Jeffreys Creek, mile 89, with the U. S. snag boat
Wateree and hired labor, September 1-October 15, 1934.
   The additional sum of $5,000 can be profitably expended during
the fiscal year ending June 30, 1936, in maintenance snagging from
Bull Creek, mile 29.5, to Jeffreys Creek, mile 89.
                                            Cost and financial summary

Cost of new work to June 30, 1934____________________________  $183, 712. 41
Cost of maintenance to June 30, 1934__________-_______________ 183, 473. 06

           Total cost of permanent work to June 30, 1934____________                                           185. 47
                                                                                                          3--367,

Net total expenditures_____--------------                                                                 367, 185. 47
Unexpended balance June 30, 1934____________________________                                                5, 000. 00

           Total amount appropriated to June 30, 1934______________                                        372, 185. 47


           Fiscal year ending June 30                 1930          1931             1932          1933         1934


Cost of new work__--------------
Cost of maintenance-------------------              $9, 285. 14   $3, 305. 88   $6, 877. 86     $11, 359. 56      $37. 50

Total expended            ---------------            6, 308. 68    5, 480. 53    6, 877. 86      11,069. 61       327. 45

Allotted     ----------------------------           11, 000. 00    4, 500. 00         500. 00    10, 085. 47    5, 000. 00
410      REPORT     OF CHIEF OF       ENGINEERS, U.   S. ARMY,   1934

Balance unexpended July 1, 1933                                 $327. 45"
Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934------------------------------------------------ 5, 000. 00

      Amount to be accounted for-------------------------------5, 327. 45
                      __________________________---327. 45
Gross amount expended--

     Balance unexpended June 30, 1934--------------------------5, 000. 00
Amount that can be profitably expended in fiscal year ending June
  30, 1936, for maintenance 1------                                     5, 000.00,

      5. WATERWAY FROM WINYAH BAY TO CHARLESTON, S. C.

   Location.-The route of the waterway follows creeks, sounds,
rivers, bays, and extensive marshland cuts beginning at a point 8
miles below Georgetown in Winyah Bay to Charleston Harbor. The
route is tidal throughout and is sheltered from the sea. The route
of the present project will shorten the distance from Charleston to
Winyah Bay about 7 miles, making a total distance of 57 miles.
   Existing project.-This provides for a channel 4 feet deep at mean
low water and 60 feet wide at bottom between Charleston Harbor
and Minim Creek, with a branch channel of the same dimensions to
Morrisons Landing in McClellanville, and for a channel 6 feet deep
at mean low water and 70 feet wide from the mouth of Minim Creek
to Winyah Bay. The mean tidal range is 3.5 to 5.1 feet, according
to locality. The estimate of cost for new work for the existing 4-foot
by 60-foot project, revised in 1932, is $500,000, and the latest (1932)
approved estimate for annual cost of maintenance is $40,000. For
the modified project, with 90 feet bottom width and 10 feet depth,
as recommended by the Chief of Engineers and included in the
Public Works program, the estimate of cost for new work is
$1,296,000, with annual maintenance estimated at $100,000 for the
first 3 years, and $46,000 annually thereafter.
   The existing project was authorized by the following river and:
harbor acts: The act of September 19, 1890, provided for the chan-
nel from Minim Creek to Winyah Bay (Annual Report for 1889,
p. 1184); the act of June 13, 1902, provided for the channel from
Charleston to a point opposite McClellanville (H. Doc. No. 84, 56th
Cong., 1st sess., and Annual Report for 1900, p. 1908); the act of
March 2, 1907, provided for the branch channel to McClellanville
 (Annual Report for 1903, p. 1133); the act of March 2, 1919, pro-
vided for extending the channel to Minim Creek and thence through
the Estherville-Minim Creek Canal to Winyah Bay (H. Doc. No.
178, 63d Cong., 1st sess.) ; and the act of March 3, 1925, provided
for the cut across the Santee Delta at Four Mile Creek (H. Doc.
No. 237, 68th Cong., 1st sess.). For latest published maps see two,
last-named documents and Rivers and Harbors Committee Document
No. 11, Seventy-second Congress, first session.
   Supplementing the work authorized by Congress, the construc-
tion of a waterway 10 feet deep and 90 feet wide between Winyah
Bay and Charleston, as recommended by the Chief of Engineers, in
Rivers and Harbors Committee Document No. 11, Seventy-second
Congress, first session, has been included in the Public Works pro-
gram.
1Exclusiv4 of available funds.
        RIVERS AND   HARBORS-CHARLESTON,        S. C.,   DISTRICT   411
    Recommended modifications of project.-Included in Public Works
-program.
    Local cooperation.-The conditions imposed requiring that all land
needed for the improvement should be furnished free of cost to the
United States are being complied with. The further condition re-
-quiring assurances from local interests that they will replace the
present Cove Inlet bridge, if and when necessary, has been met by a
statement from the State highway department that they are re-
quired by existing law to maintain this bridge as a part of the State
highway system.
    Terminal facilities.-Several small landings are located at con-
venient places along the waterway and creeks and bays connecting
with it. The facilities are sufficient for the present commerce.
             OPERATIONS AND RESULTS DURING FISCAL YEAR

    Regular funds.-Maintenance work under the existing project
consisted of the removal by the U. S. snag boat Wateree of 406
,obstructions from Four Mile Creek and the Estherville-Minim Creek
Canal and the clearing of the banks of overhanging trees, and the
removal by contract of 60,164 cubic yards of silt, mud, and sand
from the Estherville-Minim Creek Canal to restore project depth
for a width of 50 feet. An experiment was made at the United
States Waterways Experiment Station at Vicksburg, Miss., to reduce
maintenance in the Estherville-Minim Creek Canal.
    The costs during the year were $8,462.06 for dredging in the north
end of the Estherville-Minim Creek Canal by contract, $5,494.63 for
removing obstructions in the Estherville-Minim Creek Canal and
Four Mile Creek by Government plant and hired labor, $4,831.29
for general supervision of the project, including $2,187.57 for com-
pletion of laboratory study, a total of $18,787.98, all chargeable to
maintenance. The total expenditures were $16,630.18.
   Public Works funds.-In the prosecution of the work to provide
a channel 10 feet deep and 90 feet wide, the U. S. pipe-line dredge
Ciurrituck removed 3,498,324 cubic yards between McClellanville and
the South Santee River, and 5,959,271 cubic yards of material were
removed by contract between Charleston and McClellanville. The
U. S. snag boat Wateree removed 500 cubic yards of ballast stone
and 32 logs from the channel near the Cove Inlet bridge. The U. S.
dredge Currituckc completed the channel from mile 33.9 to mile 42.6
from Charleston Harbor and by contract in the following reaches,
all measured from Charleston Harbor: Mile 0 to mile 6.6, mile 10
to mile 12.3, mile 14.4 to mile 20.8, mile 23 to mile 23.5, mile 24.6 to
mile 25.7, and mile 32.2 to mile 33.9.
    The costs during the year were $155,427.72 for dredging with the
U. S. dredge Currituck; $450,254.31 for dredging by contract; and
$10,667.34 for location survey, including probing, and general super-
vision of the project; a total of $616,349.37, all chargeable to new
work.
    The: ttal expenditures during the year from funds allotted under
the Public Works program were $466,521.92.
    Condition at end of fiscal year.-The project, with the exception
of the Estherville-Minim Creek Canal, has been completed. The
controlling depth is 4 feet for a width of 30 feet.
412     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

   Under funds allotted by the Public Works Administration the
10-by-90-foot waterway has been 53 percent completed. The work
remaining to be done consists of dredging 21 miles of the waterway
under existing contracts and of dredging 5 miles under an addi-
tional contract.
   The total cost to date for new work amounts to $435,213.16 from
maintenance and improvement funds and $616,349.37 from funds
allotted under the Public Works Administration, a total of $1,051,-
562.53. The total cost to date for maintenance amounts to $540,-
378.45, all maintenance and improvement funds. The total cost to
date for new work and maintenance amounts to $1,591,940.98. The
total expenditures to date amount to $1,439,955.73.
   Proposed operations.-The balance unexpended July 1, 1934,
$43,576.29 from regular maintenance and improvement funds, will be
applied as follows:
Accounts payable------------      ----------------------------      $2, 157. 80
Maintenance: Dredging to restore project dimensions of 4 feet depth
  for the full project width of 60 feet, as may be found necessary,
  in Salt Pond Creek and Vanderhorst Creek, with Government plant
  and hired labor, Oct. 1-31, 1934                                  11, 497.06.
Balance remaining       --------------------------------------- 29, 921. 43
      Total     -------------                                           43, 576. 29

  The balance unexpended, $829,470.08 from funds allotted under
the National Industrial Recovery Act of 1933 will be applied as
follows:
Accounts payable July 1, 1934__                                      $149, 827.45
New work :
    Completion of dredging in subsection no. 1, the southerly 15
      miles of the waterway, from Charleston Harbor to a point
      opposite Price Inlet, by contract, July 1-31, 1934 ..........    77, 513. 88
    Completion of dredging in subsection no. 2, extending from a
      point opposite Price Inlet, 15 miles north of Charleston
      Harbor, to a point opposite Belvedere Creek, 22 miles north
      of Charleston Harbor, by contract, July 1-31, 1934 ..----        19, 473. 43
    Completion of dredging in subsection no. 3, extending from a
      point opposite Belvedere Creek, 22 miles north of Charleston
      Harbor, to a point on Owendaw Creek, 29 miles north of
      Charleston Harbor, by contract, July 1, 1934-Jan. 8, 1935___ 107, 969. 44
    Completion of dredging in subsection no. 4, from a point on
      Owendaw Creek, 29 miles north of Charleston Harbor, 7.6
      miles northward to a point opposite the town of McClellan-
                                                         ----------
      ville, S. C,., by contract, July 1, 1934-Feb. 6, 1935           105, 702. 23:
    Completion of dredging in subsection no. 6, from a point 5
      miles north of the town of McClellanville, S. C., 9 miles
      northward to the north Santee River, by U. S. pipeline
      dredge Currituck and hired labor, July 1-Sept. 30, 1934....     118, 878. 04:
    Dredging subsection no. 7, extending from South Santee River,
      5 miles northward to Winyah Bay, with U. S. pipeline dredge
      Curritueck and hired labor, Oct. 1-Nov. 15, 1934, and Jan. 20-
      June 30, 1935             --------------------------------------170, 813. 88.
   :Revetting nine inlets between the South Santee River and
      Charleston, S. C., by hired labor, Jan. 1-May 31, 1935_..-.      36; 000. 00
   :Surveys and reference monuments, July 1, 1934-June 30, 1935.        6, 000. 00
Maintenance:
    Dredging to restore project dimensions as may be necessary,
      from Charleston to Winyah Bay, by Government plant and
      hired labor, Apr. 15-May 31, 1935 -_---------                    37, 299. 73

         Total_-.------------_                        ____829,              478. 08:
          RIVERS, AND I~ARBORS-CHARI:ESTON,                       S. C., DISTRICT                413.
  The additional sum of $100,000 can be profitably expended during
the fiscal year ending June 30, 1936, in maintenance dredging as may
be found necessary between Winyah Bay and Charleston, S. C.
                               Cost and financial summary

                        MAINTENANCE     AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934 ____      ________     ______--                        $435, 213. 16
Cost of maintenance to June 30, 1934_ ....
                                         ______      _____---                             540, 378. 45

      Total cost of permanent work to June 30, 1934________                               975, 591. 61
Minus accounts payable June 30, 1934_______________________--                               2,157.80

     Net total expenditures_--___---    ----------------                                  973, 433. 81
Unexpended balance June 30, 1934 __________________---
                                       --    ---       -43,                                    576. 29,

       Total amount appropriated to June 30, 1934                 __---      ____-1, 017, 010. 10

       Fiscal year ending June 30            1930      1931         1932          1933          1934

Cost of new work--- ----------                      $6, .-- $ , .-- $7,                    ........
Cost of maintenance----------------- $44, 221. 03   $36, 076. 25 $23, 658. 60 $37, 064. 58 $18, 787.98
Total expended-------------------- 51, 754. 08       37, 190. 13 30, 519. 12 36, 741. 07      16, 630. 18
Allotted --------------------------- 58, 000. 00      2,350. 00    7,100. 00   36, 975. 96   59, 970.78


Balance unexpended July 1, 1933___       _______                                              $235. 69
Amount allotted from War Department Appropriation                          Act ap.
proved Mar. 4, 1933-------     -----------------------------                              60, 000. 00

     Amount to be accounted for__ _______-----------60,                                        235. 69
Deductions on account of revocation of impounded funds----------                                29.22

      Net amount to be accounted for_---------------                                        60, 206.47
Gross amount expended__________---------            $16, 660. 14
Less reimbursements collected__--------------   ___       29. 96
                                                                                            16, 630. 1&

      Balance unexpended June 30, 1934____-----------------                                 43, 576. 29
Outstanding liabilities June 30, 1934---- ------------------                                 3,162. 18

      Balance available June 30, 1934 .___-           __-------------    -  40,414.11
Amount that can be profitably expended in fiscal year ending June
                             -- - - - -- - - -- - - -- - - -- - - - -- -
30, 1936, for maintenance __ __                                           10, 000. 00.

                                    PUBLIC    WORKS FUNDS

Cost of new work to June 30, 1934___                                                      616,349. 37
Cost of maintenance to June 30, 1934,----------------------------

     Total cost of permanent work to June 30, 1934___,                                    616, 349. 37
Minus accounts payable June 30, 1934__ -1-____-----------                          -      149, 827. 45.

     Net total expenditures----------------------------------                             466, 521. 92
Unexpended balance June 30, 1934_______8_____--------------                               829, 478. 08

        Total amount appropriated to June 30, i934                             _ 1,29 , 00. 00
                                                                             ....
  1Exclusive of available funds.
414               REPORT OF CHIEF OF ENGINEERS,                                                U.    S. ARMY,           1934


      Fiscal year ending June 30                     1930                 1931                1932            1933                  1934



Cost of new work---................-----........---.....----...-------------------------------------.$616,                                 349. 37
                    ...------------------
Cost of maintenance--                                        -------------------------------------------
Total expended-----------------------------------------                                                      --------                466, 521.92

Allotted........-------............              ---------------------                  -----------         ...--------------      , 296, 000.00



Amount allotted from National Industrial Recovery Act approved
  June 16, 1933------------             --------------------- $1,206,000. 00

Amount to be accounted for__  ____________-----------------        1, 296, 000. 00
Gross amount expended----------------------- $466, 548.09
Less reimbursements collected  -----------------            26. 17
                                                                      466, 521.92

      Balance unexpended June 30, 1934---------------------                                                                      829, 478. 08
Outstanding liabilities June 30, 1934---- ----    $43, 610. 48
Amount covered by uncompleted contracts----------489, 645. 39
                                                                                                                                 533, 255. 87

             Balance available June 30, 1934                                 ----------------------                              296, 222. 21

CONSOLIDATED                 COST AND FINANCIAL                      SUMMARY             FOR WATERWAY,             WINYAH             BAY     TO
                                                           CHARLESTON,             S.    C.


Cost of new work to June 30, 1934------------------------                                                               $1, 051, 562. 53
Cost of maintenance to June 30, 1934 -----------------                                                                      540, 378. 45

      Total cost of permanent work to June 30, 1934---------- 1, 591, 940. 9'8
Minus accounts payable June 30, 1934------------------- ----     151, 985. 25

     Net total expenditures__--_---    --------------------                                                               1,439,9:55.73
Unexpended balance June 30, 1934_ _...                                                                                      873, 054. 37

             Total amount appropriated to June 30, 1934------------                                                      2, 313, 010.10


     Fiscal year ending June 30                         1930                1931                1932            1933                  1934


Cost of new work --- ---                   - -                                                                                     $616, 349. 37
Cost of maintenance-------------                    $44, 221, 03          $36, 076. 25        $23, 658. 60    $37, 064. 58            18, 787. 98

         Total cost-                 ---...--.
                              ----.......             44, 221. 03          36, 076. 25         23, 658. 60     37, 064. 58           635,137. 35

Total expended----------------.................       51, 754. 08          37, 190. 13         30, 519. 12     36, 741. 07           483, 152. 10

Allotted..............----------------------.         58, 000. 00           2, 350. 00          7, 100. 00     36, 975. 96         1, 355, 970. 78



Balance unexpended July 1, 1933-----------------------------                                                                        $235, 69
Amount allotted from War Department Appropria-
  tion Act approved Mar. 4, 1933_ __               $60, 000. 00
Amount allotted from National Industrial Recovery
Act approved June 16, 1933-_ ---------------- 1,296,000.00
                                                                                                                          1, 356, 000. 00

     Amount to be accounted for------------------------                                                                  1, 356, 235. 69
Deductions on account of revocation of impounded funds ..--.                                                                      29. 22

            Net amount to be accounted for----------------------                                                         1, 356, 206.47
               RIVERS AND HARBORS-CHARLESTON,                             S. C.,      DISTRICT          415
Gross :amount expended________________________
                                             --                            $483,208.23
Less reimbursements collected___  __-----___                                --- 56. 13
                                                                                                $483, 152. 10
      Balance unexpended June 30, 1934____________________                                       873, 054. 37
Outstanding liabilities June 30, 1934_____------- 46, 772. 66
Amount covered by uncompleted contracts _______._ 489, 645. 39
                                                                                                 536, 418. 05
         Balance available June 30, 1934 ______________________                                  336, 636. 32
Amount that can be profitably expended in fiscal year ending
   June 30, 1936, for maintenance 1_______                          ___                          100, 000. 00

6. OPERATING                AND CARE OF LOCK AND DAM ACROSS CONGAREE
                               RIVER NEAR COLUMBIA, S. C.

   The improvement for which report is made under this caption
forms part of the project for Congaree River, S. C. The work car-
ried on is the maintenance of the lock and dam described in the
Annual Report for 1932, page 600. The completed lock and dam
has been maintained under the permanent indefinite appropriations
since April 7, 1906.
   Operations and results during fiscal year.-None.
   The total costs during the fiscal year amounted to $274.94. The
total expenditures were $248.03.
   Condition at end of fiscal year.-The lock and dam are completed
but were placed out of commission in August 1920; the maneuver
boat and all other property have been sold or removed and the build-
ings are being rented.
   The total cost to date was $109,817.12 and the total expenditure
$109,790.21, all chargeable to maintenance.
  Proposed operations.-The project will be maintained during the
fiscal year 1935 with funds allotted from appropriations made
available for such purposes.
                                         Cost and financial summary

Cost of maintenance to June 30, 1934__                       ___________                        $109, 817. 12
Minus accounts payable June 30, 1934____-----                    ____-----------                       26. 91

     Net total expenditures--------------------------                                            109, 790.21
Unexpended balance June 30, 1934_ ... ___--______-------------                                         42. 89

          Total amount appropriated to June 30, 1934-.__                          ____   -       109, 833. 10


          Fiscal year ending June 30              1930       1931          1932          1933         1934

Cost of new work .----------------------------------
Cost of maintenance--------------------$570. 67               $44. 90      $351. 05      $54. 37       $274.94
Total expended_____-------------------------__     482. 90    132. 67       351. 05          54.37      248.03
Allotted-------------------------- ------------               200. 00       500. 00       -1. 09         -. 92

   1Exclusive of available funds.
          91536-ENG 1934-27
416       REPORT     OF CHIEF OF ENGINEERS,                 U.    S.   ARMY,   1934

Balance unexpended July 1, 1933--------------------------------                       $291.84
Deductions on account of revocation of impounded funds ----------                         . 92

        Net amount to be accounted for -----------------------------                   290. 92
Gross   amount   expended_,_               --------------                              248.03

      Balance unexpended June 30, 1934----------------------------                      42. 89
Outstanding liabilities June 30, 1934                                                   26. 91
        Balance available June 30, 1934-----------------------------                    15. 98
                         7. CHARLESTON HARBOR,                   S. C.

   Location.-This harbor is on the coast of South Carolina, about
15 miles southerly of the middle point of the coast line, 50 miles
southwest of Winyah Bay, S. C., and 80 miles northeast of the mouth
of the Savannah River. (See U. S. Coast and Geodetic ,Survey
Charts Nos. 1239 and 470.)
   Previous projects.-Adopted by acts of August 30, 1852, June 18,
1878, August 11, 1886, March 3, 1899, June 25, 1910, August 8, 1917,
and July 18, 1918.
   The total cost and expenditures under all previous projects amount
to $6,988,444.61, of which $6,586,455.11 was for new work and $401,-
989.50 was for maintenance. Of the expenditure for new work
$1,032,254.09 was applied to work on the 40-foot project adopted by
the 1918 act. For further details see page 1808 of Annual Report for
1915, and page 579, Annual Report for 1926.
   Existing project.-This provides for commercial purposes a chan-
nel 30 feet deep, 1,000 feet wide, from the sea to the inner end of the
jetties, thence 600 feet wide to the navy yard, and thence 400 feet
wide to Goose Creek, with a turning basin 700 feet wide at the port
terminals, together with a channel 30 feet deep at mean low water
and 500 feet wide through Town Creek, at a total estimated cost of
$314,000 for new work with $95,000 annually for maintenance.
   The project also provides for a 40-foot channel 1,000 feet wide
from the lightship to the inner ends of the jetties, these jetties to be
of stone on log mattress foundation, the north jetty having a length
of 15,443 feet and the south jetty 19,104 feet, thence 600 feet wide
to the south pier at the navy yard, and thence 1,000 feet wide to the
commandant's wharf, at an estimated first cost of $3,603,000 and
$250,000 annually for maintenance, both figures being additional to
the estimates for the commercial project given above, and that it be
considered as a national defense rather than a commercial measure
and be prosecuted only as found necessary in the interest of national
defense.
   The above estimates were made in 1925, and are exclusive of ex-
penditures on previous projects.
   The mean tidal range is 5.2 feet, though this is increased to 7 or
8 feet under the influence of northeast winds or storms of long
duration.
   The existing project was adopted by the River and Harbor Act of
January 21, 1927 (H. Doc. No. 249, 69th Cong., 1st sess.), and is a
modification of the following river and harbor acts: The act of
June 18, 1878, provided for the two jetties and for auxiliary dredg-
ing (Annual Report for 1878, pp. 553-572); the act of August 8,
        RIVERS AND HARBORS-CHARLESTON,         S.   C., DISTRICT   417

1917, provided for increase in depth to 30 feet, with a width of 500
feet between the jetties and 1,000 feet seaward thereof (H. Doc. No.
288, 62d Cong., 2d sess.) ; and the act of July 18, 1918, provided for
the 40-foot channel (H. Doc. No. 1946, 64th Cong., 2d sess., pt. I, pp.
21-29, 57, 58, and 64-68.) The latest published maps are printed in
House Document No. 249, Sixty-ninth Congress, first session.
   The act of July 18, 1918, provided that the 40-foot channel up to
the navy yard should not be undertaken " until the proposed new
dry docks at this navy yard, carrying a depth of 40 feet of water
over the blocks, has been authorized." This dock was authorized
in the Naval Appropriation Act approved July 1, 1918 (40 Stat. L.
725).
   Local cooperation.-Fully complied with.
   Terminal facilities.-Piersand slips extend for about 1 mile along
the eastern water front of the city of Charleston, and an additional
mile is covered by marginal wharves. The Port Utilities Commis-
sion of the city of Charleston owns the terminals at Columbus Street,
a large pier near Market Street, and two piers at Tradd Street. It
also owns and operates the belt-line railway serving all wharves and
warehouses and connecting with trunk lines entering the city. Its
wharves are open to the public on a charge basis. The cosmmission
has made extensive improvements at its terminal property and piers.
Modern facilities exist also at the coal pier of the Southern Railway
and at the wharves of the Standard Oil Co., the Charleston Dry
Dock & Machine Co., the Clyde Steamship Co., and the Seaboard Air
Line Railway Co.
   On Cooper River above the navy yard a compress and warehouse
company has a marginal wharf 700 feet long; and the Texas Corpo-
ration, the Sinclair Refining Co., and the Read Phosphate Co.
maintain piers at their property.
   About 10 miles from the city the port terminals, built for Army
purposes and to some extent still so used, are now leased by the Port
Utilities Commission of the city from the United States Shipping
Board for commercial purposes. A 30-foot channel leads to these
marginal wharves, 2,030 feet long, where modern facilities exist for
transfer of freight between ships and railroads, and extensive ware-
houses and rail connections are provided.
            OPERATIONS AND RESULTS DURING FISCAL YEAR

  Regular funds.-All work during the year was maintenance and
consisted of the removal by the U. S. snagboat Wateree of 2,875
cubic yards of mud and sand from the tributary channel in Shem
Creek, under authority of section 3 of the Rivers and Harbors Act of
July 3, 1930, and the removal by contract of 266,394 cubic yards of
sand and mud from Cooper River and Town Creek channels.
  The costs during the year were $900 for dredging in Shem Creek
with Government plant and hired labor; $45,930.20 for dredging
under contract in Cooper River and Town Creek; and $672.69 for
general supervision of the project, including $31.85 for survey of
Engineer slips in connection with dredging; $7,957.87 for mainte-
nance and operation of Castle Pinckney Depot and the Engineer
Wharf; a total of $55,460.76, all chargeable to maintenance.
  The total expenditures were $49,672.30.
418    REPORT   OF   CHIEF OF ENGINEERS,     U. S.   ARMY,   1934

   Public Works funds.-With funds allotted by the Federal Emer-
gency Administration of Public Works, the U. S. hopper dredge
Comstock removed 404,551 cubic yards of sand from the channel
between the jetties, classed as new work, and 441,878 cubic yards of
sand from the channel beyond the jetties, classed as maintenance.
   The costs during the year were $38,886.41 for dredging between
the jetties, classed as new work, and $46,179.51 for maintenance
dredging in the entrance channel, all done with Government plant
and hired labor, a total cost of $85,065.92.
   The total expenditures were $83,578.43.
   Condition at end of fiscal year.-The commercial project is 88 per-
cent completed. The jetties protecting the entrance channel across
the bar were completed in 1895. The north jetty is 15,443 feet long
and the south jetty 19,104 feet long; the distance between their axes
at the outer end is 2,900 feet, and their height, as originally built,
was 12 feet above mean low water for the greater part of their length.
   A survey of the Charleston Harbor bar made in June 1934 shows
that the entrance channel has a depth of 30 feet for a width of 850
feet and that the channel between the jetties has a depth of 30 feet
for a width of 800 feet. A survey made in December 1933 of Cooper
River and Town Creek showed that from the inner end of the jetties
to the navy yard via the Cooper River there is a 30-foot channel 600
feet wide and thence a 30-foot channel 400 feet wide to the Ordnance
Depot Wharf. From thence to Goose Creek there is a controlling
depth of 23 feet for a width of 280 feet. In Town Creek there is a
30-foot channel for a width of 500 feet. The substructure of the
masonry sea wall of the Engineer Wharf is in need of further
repairs.
   As a result of dredging done by the Navy Department under the
Naval Appropriation Act of August 29, 1916, a channel 30 feet deep
at all stages, 600 feet wide in straight reaches and increased to 1,000
feet at bends extending from deep water in Cooper River to the
United States navy yard, passing to the east of Drum Island, was
completed. Dredging done in connection with the construction of
the Army supply base at North Charleston provided a channel 30
feet deep at mean low water, with a varying width of 400 to 800
feet from the navy yard to above the supply base, a distance of 31
miles. Work remaining to be undertaken consists of the widening
of the channel between the jetties to 1,000 feet and the extending of
the channel from the Ordnance Depot Wharf to Goose Creek.
   The costs to date amount to $277,711.72, from regular funds and
$38,886.41 from Public Works funds, a total of $316,598.13 for new
work, and $397,191.84 from regular funds and $46,179.51 from
Public Works funds, a total of $443,371.35 for maintenance; a total
of $759,969.48.
   The total expenditures to date amount to $699,471.89 from regular
funds and $83,578.43 from Public Works funds, a total of
$783,050.32.
   Proposed operations.-The balance unexpended and accounts re-
ceivable July 1, 1934, $59,022.76, from regular funds will be applied
as follows:
                RIVERS AND HARBORS-CHARLESTON,                                         S. C., DISTRICT                       419
Accounts payable July 1, 1934_ _.                      ___                _-------------------                         $4, 011. 82
Maintenance :
   Dredging the slips at the Engineer Wharf, by contract, Oct. 1-15.
      1934, and May 1-15, 1935__----------------------------------    6,                                                  000. 00
   Construction of garage and warehouse on the Engineer Wharf at
      the customhouse, by contract July-September 1934----------- 5,                                                      493. 19
   Maintenance and operation of Castle Pinckney Depot and Engi-
      neer Wharf and garage__ ________--------------------            7,                                                  000. 00
   General supervision of the project, including renewal with Gov-
      einment plant and hired labor during August 1934, of mooring
      piles in refuge harbor in Hobcaw Creek_--------------- --      36,                                                  517. 75

           Total --                                        _-----------                   -------                      59, 022. 76

  The balance unexpended, $92,821.57 from an allotment made under
the provisions of the National Industrial Recovery Act will be
applied as follows:
Accounts payable July 1, 1934---------------------------------          $1, 487. 49
New work: Completion of dredging between the jetties to complete
  the channel to a depth of 30 feet for the full project width of 1,000
feet, with Government plant and hired labor, Sept. 1-Nov. 30, 1934_ 55, 113. 59
Maintenance: Completion of dredging in the outer bar channel to
  restore project dimensions with Government plant and hired labor,
                            -----------------------------------
Dec. 1, 1934-Jan. 31, 1935___                                          36, 220. 49

           Total_--------------------------------_                                                                     92, 821. 57
  The additional sum of $50,000 can be profitably expended during
the fiscal year ending June 30, 1936, in maintenance dredging in the
outer bar channel during the period April 1 to June 30, 1936.

                                            Cost and financial summary
                                   MAINTENANCE AND IMPROVEMENT FJNDS

Cost of new work to June 30, 1934--------------------------                                                  $6, 864, 166. 83
Cost of maintenance to June 30, 1934                                                                                   181. 34
                                                                                                                 7--------------------------99,
      Total cost of permanent work to June 30, 1934-----------                                                 7, 663, 348. 17
Value of plant, materials, etc., on hand June 30, 1934-                                                             3, 026. 52

                                     -------------------------- 7, 606, 374. 69
      Net total cost to June 30, 1934_
Plus accounts receivable June 30, 1934-----------------------       25, 553. 63

      Gross total costs to June 30, 1934                                                                          691, 928. 32
                                                                                                               7------------------------,
Minus accounts payable June 30, 1934_-.-                                     ---                                     4, 011. 82

      Net total expenditures------------------------------                                                     7, 687, 916. 50
Unexpended balance June 30, 1934----------------------------                                                       33, 469. 13
           Total amount appropriated to June 30, 1934-.--.                                                  .- 7. 721, 385. 63


           Fiscal year ending June 30                     1930           1931            1932              1933            1934

Cost of new work --- -------                          $118, 183. 58                  $24, 295. 03   .
Cost of maintenance ----------------                    78, 090. 49   $18, 778. 90   118, 317. 39   $11, 609. 33         $55, 460. 76

      Total cost ---------------------                 196, 274. 07    18, 778. 90   142, 612. 42        11, 609. 33      55, 460. 76 i
Total expended .          ------------       ------    197, 146. 21    44, 729. 80   124, 717. 33       -1, 713. 77       48, 672, 30
Allotted     .---------------------...                 207, 100. 00     8, 000. 00     6, 000. 00        7, 519. 29       56, 930. 34
420         REPORT OF           CHIEF OF ENGINEERS,                 U.        S.    ARMY,            1934

Balance unexpended July 1, 1933___________________ _______                                                 $25, 211. 09
Amount allotted from War Department Appropria-
  tion Act approved Apr. 26, 1934_______________ $10, 800. 00
Amount allotted from War Department Appropria-
  tion Act approved Mar. 4, 1933__________________ 50, 261. 79
                                                                                                            61, 061. 79
      Amount to be accounted for                                                                            86, 272. 88
Deductions on account of revocation of impounded funds ...--                                                 4, 131. 45
      Net amount to be accounted for_                                                                       82, 141. 43
Gross amount expended_                             $167,394. 65
Less:
    Reimbursements collected-------- $118, 396. 71
    Receipts from sales                    325. 64
                                                    118, 722. 35
                                                                                                            4_ 672 e0

      Balance unexpended June 30, 1934___                                                                   33.469. 13
Outstanding liabilities June 30, 1934__________________                                                      6,496. 71

      Balance available June 30, 1934______________                                                         26, 972. 42
Accounts receivable June 30, 1934_____________________                                                      25, 553. 63

         Unobligated balance available June 30, 1934_                                                       52, 526.05

Amount that can be profitably expended in fiscal year ending
                                 .
   June 30, 1936, for maintenance 1__-________                      __                                      50, 000. 00

                                          PUBLIC WORKS FUNDS

Cost of new work to June 30, 1934_ __ _-                                                                     8, 886. 41
Cost of maintenance to June 30, 1934----------------------                                                  46, 179. 51

     Total cost of permanent work to June 30, 1934                                 --------                 85, 065. 92
Minus accounts payable June 30, 1934_______________________-                                                 1, 487. 49

         Net     total    expenditures --------------------                         -----                   83, 578. 43
Unexpended balance June 30, 1934--------------------------                                                  92, 821. 57

         Total amount appropriated to June 30, 1934                      ----------             _          176, 400. 00

        Fiscal year ending June 30             1930          1931                 1932              1933        1934
                                            Cost ofInew work
                 .
Cost of new work___                                                                                           $38,'886.41
Cost of maintenance-                                                                                           46, 179. 51
      Total cost ....                          -----   ---                                                     85,065. 92

'Total expended .                                                   -    --                     -              83, 578. 43

Allotted____________                                   .-                     -             -   -                 400. 00
                                                                                                               176,


Amount allotted from National Industrial Recovery Act approved
  June 16, 1933_--------- ------------------------------------                                         $176, 400. 00

      Amount to be accounted for_                                                                          176, 400. 00
Gross amount expended------------------------- $86, 778.79
Less reimbursements collected --- ______-___--3, 200. 36
                                                                                                            83, 578. 43
      Balance unexpended June 30, 1934_                                                                     92, 821.57
Outstanding liabilities June 30, 1934                    ___                  __________                     1, 715. 30

         Balance available June 30, 1934-                                                                   91,106. 27

   1Exclusive       of available funds.
              RIVERS AND HARBORS-CHARLESTON,                                           S. C.1 DISTRICT                    421

  CONSOLIDATED COST AND FINANCIAL SUMMARY FOR CHARLESTON HARBOR, S. C.

Cost of new work to June 30, 1934             _-----------------------._                                  $6, 903, 053. 24
Cost of maintenance to June 30, 1934_------------------------                                                 845, 360. 85

      Total cost of permanent work to June 30, 1934----------7,                                                 748, 414. 09
Value of plant, material, etc., on hand June 30, 1934------------                                                 3, 026. 52

      Net total cost to June 30, 1934       -----------------------                                         7, 751,440. 61
Plus accounts receivable June 30, 1934------------------------                                                  25, 553. 63

      Gross total costs to June 30, 1934-------------------                                                 7, 776, 994. 24
Minus accounts payable June 30, 1934.-------------------                                                         5, 499. 31

     Net total expenditures   ----------------------------                                                  7, 771, 494. 93
Unexpended balance June 30, 1934---------                                                                      126, 290. 70

          Total amount appropriated to June 30, 1934-------------                                           7, 897, 785. 63


          Fiscal year ending June 30                  1930                1931            1932          1933            1934

Cost of new work -       -        -___            $118, 183. 58                       $24, 295 03                     $38, 886. 41
Cost of maintenance_                                78, 090. 49     $18, 778. 90      118, 317. 39   $11, 609. 33     101, 640. 27
       Total cost        -   -         __          196, 274. 07         18, 778. 90   142, 612. 42    11, 609. 33     140, 526. 68
Total expended__________         ___               197, 146. 21         44, 729. 80   124, 717. 33   -1, 713. 77      132, 250. 73
Allotted---   --------                            207, 100. 00          8, 000. 00      6, 000. 00     7, 519. 29     233, 330. 34


Balance unexpended July 1, 1933_ -   -_  _-________                                                             $25, 211. 09
Amount allotted from War Department Appropriation
  Act approved Apr. 26,                1934   -              --------                        $10, 800.00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933     ----------         50, 261. 79
Amount allotted from National Industrial Recovery
Act approved June 16, 1933------------------- 176, 400.00
                                                                                                                237, 461.79.

      Amount to be accounted for                               262, 672. 88
Deductions on account of revocation of impounded funds----------4, 131. 45
      Net amount to be accounted for--------------------                  258, 541.43
Gross amount expended                                     $254, 173.44
                                                   _---------------------
Less:
    Reimbursements collectod        -.... $121, 597. 07
    Receipts from sales -__     -               325. 64
                                                           121, 922. 71
                                                                          132, 250. 73
      Balance unexpended June 30, 1934                                                                          1---------------------26,
                                                                                                                      290. 70
Outstanding liabilities June 30, 1934--------------------------8,                                                     212. 01
      Balance available June 30, 19'34-- ---------------------                                                      18, 078. 69
Accounts receivable June 30, 1934---------------------------                                                        25, 553. 63
          Unobligated balance available June 30, 1934--------------- 143, 632. 32

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance            --------------                                                                50, 000. 00
                                       8. ASHLEY RIVER, S. C.
  Location.-Rises near Ridgeville, S. C., and flows southeasterly
40 miles, uniting with the Cooper River to form the harbor of
  1   Exclusive of available funds.
422             REPORT OF CHIEF OF                 ENGINEERS,              U.     S. ARMY,          1934

Charleston, S. C. (See U. S. Coast and Geodetic Survey Charts
Nos. 1239 and 470.)
   Previous project.-The original project was adopted by act of
Congress approved June 14, 1880. The total cost and expendi-
tures amounted to $5,500. (For further details see p. 1809, Annual
Report for 1915.)
   Existing project.-This provides for a channel 20 feet deep at mean
low water and 240 feet wide up to the Standard Wharf, about 71/4
miles. The mean tidal variation is about 5.6 feet. The estimate of
cost for new work, made in 1912, was $51,150, exclusive of the amount
expended on previous project. The latest (1928) approved estimate
for annual cost of maintenance is $3,000.
   The existing project was adopted by the River and Harbor Act
of July 25, 1912 (Rivers and Harbors Committee Doc. No. 4, 62d
Cong., 2d sess.). For latest map of improved section see House
Document No. 1810, Sixty-fourth Congress, second session.
   Terminal facilities.-The facilities extend 51/2 miles above the
municipal wharf at Tradd Street and include the United States
lighthouse wharf, Ashepoo Fertilizer Wharf, Planters Fertilizer
Wharf, the Century Wood Preserving Wharf, and the Chicora and
the Standard Wharves of the Virginia-Carolina Chemical Co. The
fertilizer company wharves are equipped with mechanical unloading
devices. These terminals are adequate for existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The channel examined in May
1933 had a controlling depth of 19 feet for full project width, and
project depth for a width of 200 feet, except in the upper one-
quarter mile, where the width at project depth is 130 feet.
   The cost and expenditures to date were $51,150 for new work and
$35,000 for inaintenance, a total of $86,150.
   Proposed operations.-No funds are available and no work is
contemplated during the fiscal year 1935.
   The sum of $9,000 can be profitably expended during the fiscal
year ending June 30, 1936, in maintenance dredging above the Sea-
board Air Line Railroad bridge, with Government plant and hired
labor, during September 1935.
                                    Cost and financial summary

Cost of new work to June 30, 1934__--___-----_____--------------                                                 $56, 650
Cost of maintenance to June 30, 1934_____________--  -------------                                                35, 000

             Total cost of permanent work to June 30, 1934_________                                     ___       91, 650
Net total expenditures--------------------                                      -----              --             91, 650'
Total amount appropriated to June 30, 1934________________------                                                  91, 650

            Fiscal year ending June 30              1930            1931                1932       1933           1934


Cost of new work__------------------
Cost of maintenance---------         _----------$8, 623. 57         $261. 87            $195. 62    $54. 26      --------
Total expended----------------              ----   8, 623. 57        261. 87             195. 62        54. 26
Allotted.--.-.-...-----....                        1, 000.00    I------------

Amount that can be profitably expended in fiscal year ending June 30,
1936, for maintenance -----------------------------                _ $9, 000
        RIVERS AND HARBORS-CHARLESTON,        S. C., DISTRICT     423

                     9. SHIPYARD RIVER, S. C.

   Location.-This waterway is a salt-water, tidal tributary of
Charleston Harbor, S. C. It has its source about one-half mile below
the United States navy yard, whence it flows in a southerly direction
for about 3 miles and empties into Cooper River about three-eighths
of a mile above Drum Island. (See U. S. Coast and Geodetic Sur-
vey Chart No. 470.)
   Previous projects.-Adopted by acts of July 25, 1912, and March
3, 1925.
   Total cost and expenditures prior to adopting the existing project
in 1930 were $4,150, all of which was for new work. For further de-
tails of previous projects see page 610, Annual Report for 1932.
   Existing project. This provides for a channel 20- feet deep and
100 feet wide, widened at the bends, extending from a point 50 feet
above the Tuxbury Lumber Co.'s plant to deep water in the lower
river. The Chief of Engineers is authorized to undertake, without
local cooperation, so . much of, the work contemplated as will provide
a channel 12 feet deep at mean low water and 100 feet wide, extend-
ing from the Gulf Refining Co.'s wharf to the Tuxbury Lumber
Co.'s wharf, at an estimated cost of $24,000.
   The estimate of cost for new work, made in 1928, exclusive of
amounts expended on previous projects, is $56,000, of which $10,000
is to be contributed by local interests (Rivers and Harbors Committee
Doc. No. 13,;71st Cong., 2d sess.). The latest (1928) approved esti-
mate for annual cost of maintenance is $2,500.
   The existing project was authorized by the River and Harbor
Act of July 3, 1930 (Rivers and Harbors Committee Doc. No. 13, 71st
Cong., 2d. sess.). The latest published map is contained in Rivers
and Harbors Committee Document No. 8, Sixty-ninth Congress, sec-
ond- session.
   Recommended modifications of project.-Under date of May 8,
1934, the Chief of Engineers recommended that the existing project
be modified so as to provide for a channel from deep water in Cooper
River to a point 100 feet above the Gulf Refining Co.'s terminal, with
a depth of 28 feet at mean low water, and with a width of 120 feet,
with additional widths at the bends, and for an extension of this
channel 20 feet deep and 100 feet wide, widened at the bends, to a
point 50 feet above the Tuxbury Lumber Co.'s wharf, at an estimated
cost of new work of $35,000, with annual maintenance; at $10,000 in
addition to that now required, subject to the provision that local
interests shall furnish the necessary spoil-disposal areas (Rivers and
Harbors Committee Doc. No. 43, 73d Cong., 2d sess.).
   Local cooperation.-Conditionsimposed by the River and Harbor
Act of July 3, 1930, require that local interests shall contribute
$10,000 to the cost of the work and furnish the necessary spoil-dis-
posal areas. These conditions have not been complied with.
   Terminal facilities.-Wharves are maintained by two lumber com-
panies, the Tuxbury and the North State. The Gulf Refining Co.
has completed a large marginal wharf about one-third of a mile above
the mouth of the creek for accommodation of large, deep-draft
vessels, and has dredged a 28-foot channel thereto.
    Operations and results during fiscal year.-A survey incident to
dredging was made at a cost of $141.72, chargeable to maintenance.
There were no expenditures during the year.
424          REPORT          OF CHIEF OF             ENGINEERS, U.                     S.     ARMY,           1934

    Condition at end of fiscal year.-The 12-foot channel surveyed in
March 1932 extending                        from the Gulf Refining Co.'s wharf to the
Tuxbury Lumber Co.'s                        wharf, authorized to be undertaken without
local cooperation, now                       obtains for a controlling width of 95 feet
except at the Tuxbury                       Lumber Co.'s wharf, where the width is 75
feet.       The channel maintained by the Gulf Refining Co. from the
Cooper River up to its wharf, a distance of three-fourths of a mile,
has shoaled to controlling dimensions of 22 feet depth for a width of
100 feet.
    The costs to date amount to $22,753.03 chargeable to new work and
$438.91 chargeable to maintenance.                                 The total expenditures to date
amount to $23,050.22.
  Proposed operations.-The balance unexpended July 1, 1934,
$5,949.78, less $141.72 accounts payable, or $5,808.06, will be applied
to maintenance dredging to restore a 12-foot depth for the project
width, with the U. S. pipe-line dredge Curritucle and hired labor,
November 15-20, 1934.
It is not expected that any additional funds can be profitably
expended during the fiscal year ending June 30, 1936, as the dredging
contemplated during the fiscal year 1935 is likely to be ample for
a 2-year period.
                                          Cost and financsal summary

Cost of new work to June 30, 1934----          -------------------- $26, 903.03
Cost of maintenance to June 30, 1934--------------------------           438. 91

      Total cost of permanent work to June 30, 1934-----------   27, 341. 94
Minus accounts payable June 30, 1934 ---------------------------     141. 72

     Net total expenditures__  __-------------------                                                                    27,200. 22
Unexpended balance June 30, 1934--------------                                                                           5,949. 78

          Total amount appropriated to June 30, 1934---------------                                                     33,150. 00

          Fiscal year ending June 30                  1930               1931               1932             1933              1934

Cost of new work..---------..---------                             $22, 753. 03 _
Cost of maintenance ........------------- ----    I ----
                                                 ...                                        $297.19      ....-----------       $141.72
Total expended.....-------------------------------                     22, 619. 27           248. 65         $182. 30      .      ---
Allotted.     ----------------------------. -------                    24, 000. 00 -----------------------                     5,000. 00


Balance unexpended July 1, 1933-----------------------------$949. 78
Amount allotted from War Department Appropriation Act approved
  Mar. 4, 193 -------------------------------------------      5, 000. 00

            Amount to be accounted for                 -------------                                                     5, 949. 78

Balance unexpended June 30, 1934-----------------.----           5, 949. 78
Outstanding liabilities June 30, 1934----------------------------141. 72
            Balance available June 30, 1934-------------------------                                                     5,808.06

Amount (estimated) required to be appropriated                  for completion of
                  1- - - - - - - - - - - - - - - - - - ---- ----- --- - - - - - - - -
existing project                                                                                                       23, 200. 00

   1 Exclusive of available funds.
       RIVERS AND   HARBORS-CHARLESTON,       S.   C., DISTRICT   425

      10. WATERWAY FROM CHARLESTON TO BEAUFORT, S. C.

   Lccation.-The waterway begins at the Ashley River entrance of
Wappoo Cut; passes through Wappoo Cut, Stono, Wadmelaw, North
Edisto, and Dawho Rivers, North Creek, Watts Cut, and South
Edisto River, Fenwicks Island Cut, and Ashepoo River to St. Helena
Sound; thence through, Coosaw River, Brickyard Creek, and Beau-
fort River to Beaufort, S. C. The distances from Charleston to
Yonges Island, Martins Point, and Beaufort are 25 miles, 27 miles,
and. 74/1 miles, respectively. (See U. S. Coast and Geodetic Survey
Chart No. 3256.)
   Previous projects.-Adopted by acts of March 3, 1881, and June"
13, 1902. The cost and expenditures were $133,239.22, of which
$109,489.64 was) for new work and $23,749.58 for maintenance. For
further details see page 613, Annual Report for 1932.
   Existing project.-This provides for a waterway 7 feet deep at
mean low water and not less than 75 feet wide from Charleston to
Beaufort, S. C., with cut-offs in Wappo Creek and between Dawho
and South Edisto Rivers. The mean tidal range is 5.2 feet at
Charleston and 7 feet at Beaufort. The estimate of cost for new
work, made in 1924, is $110,000, exclusive of amounts expended on
previous projects. The latest (1924) approved estimate for annual
cost of maintenance is $10,000.
   The existing project was authorized by the River and Harbor
Act of March 3, 1925 (S.Doc. No. 178, 68th Cong., 2d sess.). For
latest published maps of this waterway see U. S. Coast and Geodetic
Survey Chart No. 3256, and House Document No. 129 (72d Cong.,
1st sess.).
   Recommended modifications of project.-Under date of December
5, 1931, the Chief of Engineers recommended modification of the
project for the waterway from Charleston to Beaufort, S. C., through
a change in the route to provide a channel 7 feet deep and 75 feet
wide to connect the Ashepoo and Coosaw Rivers by a cut across
Hutchinson Island through Rock Creek and its south branch and
across Ashe Island, at an estimated cost of $79,050, with $1,000
annually for maintenance, provided local interests furnish all neces-
sary rights-of-way and spoil-disposal areas. (H. Doc. No. 129, 72d
Cong., 1st sess.)
   Local cooperation.-Complied with.
   Terminal facilities.-The wharves and terminals along the route
are sufficient for present and prospective traffic for some time to
come. At Charleston there are public wharves and terminals, in
addition to the many privately owned ones.
   Operations and results during fiscal year.-Surveys were made
with a view to undertaking maintenance dredging.
   The costs during the fiscal year were $261.66 for supervision of
project and $650.66 for predredging surveys, a total of $912.32, all
chargeable to maintenance. The expenditures during the year were
$654.66.
   Condition at end of fiscal year.-The project was completed in
1929 at a saving of $14,409 under the original estimated cost. A dis-
tance of 10 miles has been saved by the portion of the project com-
pleted from Dawho River to South Edisto River via North Creek
426            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                       1934

and Watts Cut. The total distance from Charleston to Beaufort
is now 721/2 miles measured from the Ashley River entrance of Wap-
poo Cut. Project dimensions now obtain over the entire waterway,
except for shoals in Stono River, Church Flats, and in North Creek,
where the width ranges from 70 feet down to 45 feet for a con-
trolling depth of 6 feet.
   The total costs to date have been $95,590.41 for new work and
$59,863.16 for maintenance, a total of $155,453.57.
   The total expenditures to date were $155,195.91.
   Proposed operations.-The balance unexpended July 1, 1934,
$43,285.79, will be applied as follows:
Accounts payable, July 1, 1934_ _ _--------------------___________        $257. 66
Maintenance: Dredging to restore project dimensions in Stono River
  and North Creek, and to widen the south mouth of Watts Cut at
  South Edisto River, and to cut off bends in Dawho River, with U.
  S. pipe-line dredge Currituck and hired labor, Nov. 20, 1934-Jan. 20,
1935 __-------------------                       ----------            43, 028.13
         Total--                                                          ---                                            43, 285. 79
  The additional sum of $11,000 can be profitably expended dur-
ing the fiscal year ending June 30, 1936, in maintenance dredging in
North Creek.
                                              Cost and financial summary

Cost of new work to June 30, 1934------------------------                                                           $205, 080. 05
Cost of maintenance to June 30, 1934                                                                                   3, 612. 74
                                                                                                                      8__

     Total cost of permanent work to June 30, 1934----------288, 692. 79
Minus accounts payable June 30, 1934 ________________________    257. 66

     Net total expenditures   ------------------------------                                                         288, 435. 13
Unexpended balance June 30, 1934___________________________                                                           43, 285. 79

           Total amount appropriated to June 30, 1934-------------331,                                                           720. 92

           Fiscal year ending June 30                         1930               1931          1932          1933                 1934


Cost of new work--             ---------------              ----------------------------------                           -----
Cost of maintenance .............--          .. --          $4, 306. 07  $9, 473. 82 $10, 793. 95          $9, 121. 36             $912. 32
Total expended----------                                     4, 421. 38         7, 617. 89   14, 914. 73    7, 091. 25              654. 66

Allotted----------------................-----------------   10, 000. 00       000. 00
                                                                            11,               1,400. 00     7, 835. 31           43, 196. 39


Balance unexpended July 1, 1933__                                                                                            $744. 06
Amount allotted from War Department Appropriation Act ap-
  proved Mar. 4, 1933_----------------------------------------                                                           43,200. 00

   Amount to be accounted for__                            -                                                             43, 944. 06
                                                                                                                         4____________--______
Deductions on account of revocation of impounded funds --------                                                                3. 61

     Net amount to be accounted for-----            _____-__------__                                                     43, 940.45
Gross amount expended__     ---------------------------------                                                                654.66

      Balance unexpended June 30, 1934-------------- --------  43, 285. 79
Outstanding liabilities June 30, 1934 .- __-------------------     257. 66

            Balance available June 30, 1934 --------------------                                                         43, 028. 13

Amount that can be profitably expended     in fiscal year ending June
                                     -- -- -- - -- -- - -- -- - -- -- -- - -- --
  30, 1936 for maintenance 1 - - - -                                                                                      11, 000. 00
    SExclusive of available funds.
                    RIVERS AND HARBORS-CHARLESTON,                                                   S. C.) DISTRICT                     427

    11. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                                       (GENERAL)

   The cost of work during the year amounted to $12,293.31; the ex-
penditures were $12,552.63. The balance unexpended and accounts
receivable, July 1, 1934, $20,750.21, will be applied as needed during
the fiscal year 1935, to payment of expenses to be incurred in connec-
tion with the above items. The additional sum of $25,000 can be
profitably expended during the fiscal year ending June 30, 1936.
                                                        Cost and financial summary
Cost of maintenance to June 30, 1934__ ______           _          $150, 995. 86
Value of plant, materials, etc., on hand June 30, 1934------------    -276. 08
      Net total cost to June 30, 1934 ________---__----_                                                                        150, 719. 78
Plus accounts receivable June 30, 1934______________________---                                                           _          811.93

     Gross total costs to June 30, 1934_ .. ___......                                                               ___-       151, 531. 71
Minus accounts payable June 30, 1934 __......___                                                         __..-____-                 290. 14

     Net total expenditures ___ __--____----__-                                                                                151, 241. 57
Unexpended balance June 30, 1934_-   __ ____-__                                                                ______-          19, 938. 28
              Total amount appropriated to June 30, 1934______________                                                          171, 179. 85

              Fiscal year ending June 30                                  1930            1931          1932            1933            1934


Cost of new work......... ....------.     .-----
Cost of maintenance.......------------------- $8, 583. 15                             $24, 081. 22   $44, 586. 78    $33, 504. 38     $12, 293. 31
Total expended........................-----------------------            8,473. 71     24, 321. 38    43, 645.89      34, 789. 69      12, 552. 63
Allotted-------------....................--...........--------------..   5, 500. 00    23, 000. 00    42, 000. 00     42, 534. 48      22, 645. 37


Balance unexpended July 1, 1933------------------------------     $9,845. 54
Amount allotted from War Department Appropriation Act
approved Apr. 26, 1934------------------------------  $6,100. 00
Amount allotted from War Department Appropriation Act
  approved Mar. 4, 1933------------------------------17,000. 00
                                                                  23, 100. 00

      Amount to be accounted for_______________-___________                                                                         32,945. 54
Deductions on account of revocation of allotment _____________----                                                                     454. 63

      Net amount to be accounted for-------------------------32, 490. 91
Gross amount expended_____-----         ____              12, 971.31
                                                    -______
Less reimbursements collected___-------------------------     418. 68
                                                                      12, 552. 63

      Balance unexpended June 30, 1934------------------------                                                                      19, 938. 28
Outstanding liabilities June 30, 1934 __.______-- ----- -----                                                                           292. 14

      Balance available June 30, 1934____________________                                                                      _ 19, 646. 14
Accounts receivable June 30, 1934___        ___----------                                                                            811.93

               Unobligated balance available June 30, 1934.--------------- 20,458. 07
Amount that can be profitably expended in fiscal year ending June
  30, 1936, for maintenance          --------------                25, 000. 00

     'Exclusive of available funds.
428         REPORT        OF CHIEF OF ENGINEERS,                           U.   S. ARMY,        1934

                12. Other projects for which no estimates are submitted
            [Commercial statistics for these projects are given in pt. 2 of report]

                                                           For last       Cost and expenditures to
                                                           full re-             June 30, 1934           Estimated
                   Name of project                         port see                                     amount
                                                           annual     _
                                                                                                         quired re-
                                                                                                                to
                                                           report         New work    Maintenance        complete
                                                            for-

1. Congaree River, S. C.12......................... 1932                  $364,823.87$320, 876. 77          $149, 000
2. Mingo Creek, S. C.1------------------------      1928                   29, 050. 00   1,350.00           (a)
3. Santee River, S. C.1---------------------------- 1931                   99, 750. 00 164, 741. 67         (4)

  1Channel adequate for existing commerce.
  2Revoked during fiscal year 1934, $12,580.63.
  3Completed.
  4Project for maintenance only.

Status of reports called for by rivers and harbors acts and committee resolutions
                                         Transmitted                 Recommenda-
      Locality         Authorization act to Congress   Document no.


Abbapoola Creek, S. C _ River and Harbor Act,         Sept. 16,1933 ..................... Unfavorable.
                          July 3, 1930.
Edisto River and its Flood Control Act,               ..
branches, South and      June 14, 1932.
  North Edisto, S. C.
 (Preliminary examina-
tion for flood control.)
Russell Creek, S. C _ _ River and Harbor Act                                            Do.
                                                      May 25, 1934 ...--................------------------
                          July 3, 1930.
Shem Creek, from Hog ..... do.....-----------------
  Island Channel, S. C.
Shipyard River, S. C_._. River and Harbor               May    8,1934      Rivers and Harbors         Favorable.
                           Committee resolu-                                Committee 43, 73d
                          tion, May 11, 1933.                                Cong., 2d sess.


    IMPROVEMENT OF RIVERS AND HARBORS IN THE
             SAVANNAH, GA., DISTRICT
  This district includes all watersheds and harbors in the State of
Georgia tributary to the Atlantic Ocean; Fernandina Harbor, Fla.,
and St. Marys River, Ga. and Fla., and their tributary streams; the
waterway between Coosaw River, 9 miles north of Beaufort, S. C.,
and Cumberland Sound, Ga., and that part of South Carolina
embracing the Beaufort, Broad, and Savannah River Basins.
  District engineer: Maj. C. Garlington, Corps of Engineers.
  Division engineer: Col. T. H. Jackson, Corps of Engineers, to
June 28, 1934, and Col. Earl I. Brown, Corps of Engineers, since
that date.
                                             IMPROVEMENTS

                                                  Page                                                         Page
I. Savannah Harbor, Ga ______                     429         5.Brunswick Harbor, Ga__ .                        444
2. Savannah River below Au-                                   6.Fancy Bluff Creek, Ga____                       449
     gucta, Ga._ _.___                            433         7.Satilla River, Ga_                              449
3. Waterway between Beaufort,                                 8.St. Marys River, Ga. and
      S. C., and St. Johns River,                                 Fla -___-                                     450
      F'a. (Beaufort, S. C., to                              9. Fernandina Harbor, Fla ___                      452
      Cumberland So un d sec-                               10. Examinations, surveys, and
     tion) -------------------                    438             contingencies (general) -_                    453
4. Altamaha, Oconee, and Oc-                               11. Other projects for which no
     mulgee Rivers, Ga____ __                     441             estimates are submitted,_                     454
          RIVERS AND HARBORS-SAVANNAH,          GA.,   DISTRICT    429
                     1. SAVANNAH HARBOR, GA.

   Location.-The entrance is 75 statute miles south of Charleston
Harbor, S. C., and 70 statute miles north of Brunswick Harbor, Ga.
 (See U. S. Coast and Geodetic Survey Chart No. 440.)
   Previous projects.-Adopted by Congress May 18, 1826; March 3,
1855; August 7, 1856; March 3, 1873; June 23, 1874; September 19,
1890; June 3, 1896; and June 13, 1902. The cost and expenditures
on these projects prior to 1912 were: For new work, $7,260,383.98;
for manitenance, $298,894.26; total, $7,559,278.24. For further de-
tails see page 1810 of Annual Report for 1915.
   Existing project.-This provides for a channel 30 feet deep with
a general width of 500 feet from the 30-foot contour in the ocean to
the quarantine station, 10.2 miles; thence 26 feet deep with a general
width of 400 feet to the Seaboard Air Line Railway bridge 16 miles;
thence 26 feet deep and 300 feet wide to the foot of Kings Island, 1.3
miles; and thence 21 feet deep and 200 feet wide with necessary
regulating works to the vicinity of the Savannah Creosoting Co.,
2.1 miles, a total length of 29.6 miles; for widening the channel to
600 feet at West Broad and Barnard Streets; for an anchorage basin
opposite Fort Ogelthorpe by widening the 26-foot channel to 900
feet and installing mooring dolphins; for closing South Channel by
a regulating dam and dredging a channel 7 feet deep and 100 feet
wide between the main river and Wilmington River as a substitute
for this portion of the inland waterway; for increasing the width
of the channel at Oyster Bed Island; for increasing the width of
the channel at Kings Island to 525 feet; for dredging Drakies Cut
to a depth of 13 feet and a width of 350 feet; for raising, exten-
sion, and repair of training walls, jetties, and other works; and for
bank protection.
    The plane of reference is mean low water, which varies for differ-
ent parts of the harbor. For the upper end of the harbor the mean
range of tide is 6.7 feet, with a spring range of 8.8 feet, and for the
lower end 6.6 feet and 9.4 feet, respectively. The mean tidal range
has been increased by the improvement about 2.3 feet at the upper
end.
    The estimate of cost for new work revised in 1930 is $6,146,400,
exclusive of amounts expended on previous projects. The latest
 (1926) approved estimate for annual cost of maintenance is $416,000.
    The existing project was authorized by the following river and
harbor acts: The act of June 23, 1874, provided for works of regula-
tion (Annual Report for 1873, p. 747); the act of March 2, 1907,
made tentative provision for the 26-foot channel, generally 400 to
500 feet wide (H. Doc. No. 181, 59th Cong., 1st sess.), which was
 (lefinitely adopted by the act of June 25, 1910; the act of August 8,
1917, provided for the 30-foot channel to the quarantine station
 (H. Doc. No. 1471, 64th Cong., 2d sess.) ; the act of January 21, 1927,
provided for the 21-foot channel above Kings Island (H. Doc. No.
261, 69th Cong., 1st sess.), and for other features of the project
 (H. Doc. No. 262, 69th Cong., 1st sess.) ; and the 26-foot channel to
the foot of Kings Island was provided for by the River and Harbor
Act of July 3, 1930 (S. Doc. No. 39, 71st Cong., 1st sess.). The latest
published maps are in the last three mentioned documents, and in
House Document No. 276, Seventy-third Congress, second session.
430    REPORT OF CHIEF     OF ENGINEERS,    U.   S. ARMY,   1934

   Recommended modifications of project.-On March 3, 1934, the
Chief of Engineers recommended modification of.the existing project
by eliminating the regulating dam across South Channel, the reloca-
tion of the inland waterway in the vicinity, and the further exten-
sion of training walls and revetments and jetties; and providing
for (a) increasing the present authorized depths between the quar-
antine station and the Seaboard Air Line Railway bridge from 26
feet to 30 feet and between the foot of Kings Island and the vicinity
of the terminal of the Savannah Creosoting Co. from 21 feet to
26 feet; (b) improving the hydraulic conditions of the channel with
a view to reducing shoaling by enlargement of contracted portions
and smoothing out abrupt changes; (c) providing a turning basin
near the upper end of the harbor by widening the 26-foot channel
to 600 feet for a length of 600 feet, with proper approaches; (d)
maintenance of certain existing features of the present project; all
at an estimated cost of $1,412,000 for new work and $500,000 an-
nually for maintenance, subject to certain conditions of local coop-
eration (H. Doc. No. 276, 73d Cong., 2d sess.).
   Local cooperation.-The River and Harbor Act approved January
21, 1927, imposes the condition that local interests shall furnish with-
out cost to the United States suitable dumping grounds for the dis-
posal of material dredged in connection with the initial improve-
ment and subsequent maintenance of the channel above Kings Island
and shall deed to the United States the necessary land on South
Channel for the regulating dam, and shall furnish, without cost to
the United States, a right-of-way for the intracoastal waterway ex-
tending from the main river near Fort Jackson to Wilmington River,
and suitable disposal areas for material dredged in the improvement
and future maintenance of the harbor.
   By a resolution, adopted March 13, 1929, the city of Savannah
made available the lands necessary for improvement and future
maintenance of the harbor at Kings Island, and binds itself to
furnish, when required, such dumping grounds as may be needed
in the future improvement and maintenance of Savannah Harbor.
   The city of Savannah owns the land through which the new route
of the intracoastal waterway is projected. Land for the site of the
regulating dam across South Channel has not yet been furnished
by local interests. Under the above recommended modifications of
the project, these lands will not be needed.
   All other conditions required under previous authorizations have
been complied with.
   Terminal facilities.-This improvement serves numerous wharves
and piers owned by individuals and corporations, a municipal wharf,
and the terminals of three trunk-line railways and two ocean steam-
ship companies. For further details see Port Series No. 10, Corps of
Engineers.
    Operations and results during fscal year.-There were removed
by Government plant and hired labor 4,002,820 cubic yards of mate-
rial between the Atlantic Creosoting Co.'s wharf and the sea, at a
cost of $284,439.06, all of which was maintenance dredging on the 21-,
26-, and 30-foot sections of the channel. Examinations and surveys
were made at a cost of $17,404.57. The total cost of all work was
             RIVERS AND HARBORS--SAVANNAH,          GA.,   DISTRICT         431
$301,843.63, charged to maintenance. The total expenditures were
$354,228.98.
   Condition at end of fiscal year.-The existing project is 68 percent
completed. The 21-foot channel was completed in 1929; the con-
trolling depth, as determined in July 1934, was 21.1 feet at mean
low water over a width of 185 feet. The 26-foot section of the
channel, except at bends where widening is necessary, has been
dredged to project dimensions for the entire section at different
times. Between the foot of Kings Island and Bull Street, the con-
trolling depth, as determined in June 1934, was 25.3 feet over a
width of 300 feet. Between Bull Street and Quarantine the con-
trolling depth in June 1934 was 26.9 feet over a width of 200 feet.
The 30-foot section of the channel was completed in 1930, except
at bends, where the width is to be increased. The controlling
depth as determined in June 1934 was 28.3 feet over a width of
230 feet. Long Island training wall was completed in 1931, with a
total length of 13,650 feet and an average height of about 12 feet
above mean low water. The widening of the channel at Barnard
Street was completed in 1924. An anchorage basin opposite Fort
Oglethorpe and mooring dolphins in the same locality were com-
pleted in 1926. The mooring dolphin is in good condition, except
for two pile clusters which were destroyed by shipping. The widen-
ing at Kings Island was completed in 1929. The widening at
Oyster Bed Island was completed in 1930. Dredging Drakies Cut
was completed in 1931. The 26-foot channel from the Seaboard Air
Line Railway bridge to the foot of Kings Island was completed in
1931. To complete the existing project the following work is
required:
   (a) Closing South Channel with a regulating dam and dredging channel
between the Savannah River and Wilmington River.
   (b) Raising, extension, and repair of training walls, jetties, and other
works.
  (c) Bank protection.
  (d) Dredging in the 26- and 30-foot channels to widen bends.
  The costs under the existing projects were $4,181,113.60 for new
work and $9,342,780.52 for maintenance, a total of $13,523,894.12.
The total expenditures were $14,853,083.37.
  Proposed operations.--The balance unexpended July 1, 193'4,
$272,155.19, and accounts receivable, $32,616.35, a total of $304,771.54,
will be applied as follows:
Accounts payable July 1, 1934---------------------------------    $13, 269. 82
Maintenance :
    Dredging entire length of North Channel and the Bar, U. S.
      hopper dredge Kingman, 5 months, Aug. 1-Sept. 30, 1934
      and Apr. 1-June 30, 1935--------------------------------100,000.00
    Dredging Front River and upper portion of North Channel with
      U. S. dredge Morgan, 111/2 months between July 1, 1934, and
      June 30, 1935                                               176, 000.00
    Supervision of the project and engineering studies not appli-
      cable to other work------------------------ --       ----    15, 501. 72

         Total_--___-----------                                       304, 771. 54
         91536--ENG 1934-28
432             REPORT OF CHIEF OF                              ENGINEERS, U.                 S. ARMY,               1934


  The additional sum of $380,000 can be profitably expended during
the fiscal year 1936, as follows:
Maintenance:
   Dredging entire length of North Channel and the Bar, with
      U. S. hopper dredge Kingman, 6 months, Jan. 1-June 30, 1936__ $144, 000
   Dredging Front River and upper portion of North Channel with
      U. S. dredge Morgan, 12 months, July 1, 1935-June 30, 1936_.... 216, 000
   Supervision of the project and engineering studies not in con-
      nection with above work___ .-------------  -------------         20, 000

            Total---                                                            _                                                380, 000

                                              Cost and fin'wnciad summnary

Cost of new work to June 30, 1934__..---------               $11, 441, 497. 58
Cost of maintenance to June 30, 1934         ---------------- 9, 641, 674. 78
      Total cost of permanent work to June 30, 1934----------                                                         21, 083, 172. 36
Value of plant, materials, etc., on hand June 30, 1934--  -                                                            1, 309, 842. 72

      Net total cost to June 30, 1934__                                                                               22, 393, 015. 08
Plus accounts receivable June 30, 1934_ __.__                                              ____________                    32, 616. 35

     Gross total costs to June 30, 1934       _              22, 425, 631. 43
Minus accounts payable June 30, 1934------------------------      13, 269, 82

     Net total expenditures ________-------- ____     ____                                                            22, 412, 361. 61
Unexpended balance June 30, 1934 _________________---___                                                                  272, 155. 19

            Total amount appropriated to June 30, 1934-----------                                                     22, 684, 51680

         Fiscal year ending June 30                             1930            1931           1932         I      1933            1934


Cost of new work -------------------                        $408, 997. 28 $177, 516. 09     $112, 097. 60 .........................
Cost of maintenance---------------------                     442, 096. 32 812, 387. 77       294, 439. 75 $401, 099. 36 $301, 843. 63

        Total cost....-------------------                    851, 093. 60   989, 903. ,86    406, 537. 35       401, 099. 36     301, 843. 63

Total expended.--------------------------                    931, 958. 16   956, 569. 86     330, 224. 16       187, 319. 40     354, 228. 98

Allotted .----................---------------------------    689, 000.00    843, 300. 0G -378, 300. 00          160, 424. 06     542, 729. 61


Balance unexpended July 1, 1933_                                                                                          $83, 655. 01
Amount allotted from War Department Appro-
priation Act approved Apr. 26, 1934 __ ______ $210, 000. 00
Collected from Fourth Corps Area for impounded
  savings -------------------------------------       936. 51
Amount allotted from War Department Appro-
  priation Act approved Mar. 4, 1933 -------- __ 410, 579. 70
                                                                                                                          621, 516. 21

      Amount to be accounted for____________  ___                                                                         705, 171. 22
Deductions on account of-
   Revocation of allotment-------------         65, 000. 00
   Revocation of impounded funds--------------13, 787. 05
                                                                                                                               78, 787. 05

      Net amount to be accounted for___  _                                                   _____                        626, 384. 17
Gross amount expended----------------------                                                  683, 318. 98
           RIVERS AND HARBORS-SAVANNAH,                 GA., DISTRICT           433
Less--
    Reimbursements collected------     $295,466.99
    Receipts from sales------ ----       33, 623. 01
                                                       $329, 090. 00
                                                                        $354, 228. 98
      Balance unexpended June 30, 1934-------      -___--___-            272, 155. 19
Outstanding liabilities June 30, 1934--
                                     ..-------- ---------                 31, 596. 48

     Balance available June 30, 1934__---------------                    240, 558. 71
Accounts receivable June 30, 1934__---------------                        32, 616. 35

      Unobligated balance available June 30, 1934 .__-----      __-      273, 175. 06
Amount (estimated) required to be appropriated for comple-
tion of existing project 1__  ----------                              1, 965, 300. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1936,'for maintenance 18__8__      --- _______88__             380, 000. 00
               2. SAVANNAH RIVER BELOW AUGUSTA, GA.

   Location.-This river (see U. S. Geological Survey maps of South
Carolina and Georgia) is formed by the confluence of the Tugaloo
and Seneca Rivers on the northwestern part of the South Carolina-
Georgia boundary line. It flows southeast, forming the boundary
line, and empties into the Atlantic Ocean.
   Previous project.-Adopted by the River and Harbor Act of March
3, 1881. The cost and expenditures on the previous project prior to
1890 were $93,480.09. A subdivision between new work and mainte-
nance is not possible. For further details see page 1813 of Annual
Report for 1915.
   Existing project.-This provides for a channel 6 feet deep and
75 feet wide at ordinary summer low water from Savannah, 17 miles
from the mouth, to the head of navigation at Augusta, Ga., a dis-
tance of 201 miles, to be obtained by the construction of one lock
with movable dam (details of location and design not fixed), the
use of contraction works, the closure of cut-offs, bank protection,
removal of snags, overhanging trees and wrecks, and the dredging
of troublesome bars. The mean tidal variation at the mouth of
the river is 6.6 feet, and the freshet variation at the head of the
improvement is approximately 18 feet ordinarily, with an extreme
of 39 feet.
   The estimate of cost for new work revised in 1930 is $1,933,000,
exclusive of amounts expended on previous projects. The latest
 (1930) approved estimate for annual cost of maintenance and opera-
tion is $75,000 for the first 3 years and $50,000 annually thereafter.
   The existing project was authorized by the following river and
harbor acts: The act of September 19, 1890, provided for a 5-fbot
channel (H. Doc. No. 255, 51st Cong., 2d sess.) ; the act of June 25,
1910, provided for the special improvement, by bank-protection work,
of 20 or 25 miles of river immediately below Augusta (H. Doc. No.
962, 60th Cong., 1st sess.); and the act of July 3, 1930 (H. Doc. No.
101, 70th Cong., 1st sess.), provided for the 6-foot channel and the
lock and dam. The latest published maps are in the last-mentioned
1 Exclusive of available funds.
434    REPORT OF CHIEF OF ENGINEERS,       U.   S.   ARMY,   1934

document and in House Document No. 1243, Sixty-fourth Con-
gress, first session.
    The construction of a lock and dam at New Savannah Bluff, in
lieu of the location contemplated under the existing project at an
increased cost. of $470,000 as recommended by the Chief of Engineers
under date of June 19, 1933, has been included in the Public Works
program under the National Industrial Recovery Act.
    Recommended modifications of project.-Included in Public Works
program.
    Local cooperation.-The River and Harbor Act of July 3, 1930,
provides that work shall not be commenced until local interests shall
have furnished, free of cost to the United States, the land required
for the lock and dam appurtenances, and all necessary flowage and
dumping easements, nor until satisfactory assurances have been re-
ceived by the Secretary of War that there will be available within
3 years from the date work is started adequate terminals for the
economical handling of at least 125,000 tons of commerce annually
between Augusta and Savannah, exclusive of sand and rafted or
barged logs.
    The provisions in the above-named act have not been complied
with; however, the city of Augusta in council assembled binds itself
to comply with these requirements. There are now available at
Augusta, terminals adequate for the economical handling of at least
50 percent of the commerce specified.
    Terminal facilities.--The only water terminals served by this im-
provement are at Augusta and at or near Savannah. At Augusta
the water terminal is owned by the city of Augusta. The Pure Oil
Co. has a terminal with a storage capacity of 10,357 barrels for
berthing and discharging oil barges. At Savannah there is one
municipal wharf, suitable for berths for river steamers, open to the
public on equal terms. In addition, there are extensive facilities
at Savannah, privately owned, for ocean-going and smaller vessels.
Along the river there are numerous natural landings without
wharves or railway connections. The terminal facilities on this im-
provement are considered ample for existing commerce. For fur-
ther details see Port Series No. 10, Corps of Engineers.
            OPERATIONS AND RESULTS DURING FISCAL YEAR

   Project adopted by Congress.-Maintenance snagging was carried
on between Augusta and Savannah by the U. S. snag boat Macon be-
tween July 1 and November 9, 1933, and between June 27 and 30,
1934, at a cost of $14,179.41. The work done cleared the river of the
worst obstructions.
   The U. S. pipe-line dredge Creighton did maintenance dredging
in the vicinity of Augusta between July 1 and October 19, 1933, at a
cost of $30,125.40. The expenditures were $38,630.03, all from
regular funds.
   Project authorized by Federal Emergency Administrator of Pub-
lic Works.-Field and office work was in progress in connection with
plans for lock and dam at New Savannah Bluff, and open river regu-
lations between Savannah and Augusta, Ga., between October 16,
1933, and June 30, 1934, accomplishing about 3 percent of the project
           RIVERS AND HIARBORS-SAVANNAH,                        GA.,   DISTRICT        435

at a cost of $78,799.93, all of which was for improvement. The cor-
responding expenditure was $75,560.13, all from Public Works funds.
  Plans and specifications of the lock and dam have been completed
and surveys, plans, and specifications for open river regulating
works partially completed.
  During the fiscal year the total costs were $44,304.81 from regular
funds for maintenance and $78,799.93 from Public Works funds for
improvement, a total cost of $123,104.74. The total expenditures
were $114,190.16, including $75,560.13 from Public Works funds.
  Conditionat end of fiscal year.-The improvement is about 30 per-
cent complete, the work remaining to be done consisting of the work
authorized by the River and Harbor Act of July 3, 1930, as modified
under the Public Works program. The controlling depth at ordinary
summer water was 3 feet or greater for about 65 percent of the fiscal
year. This depth corresponds to a gage height of 7.2 feet and a
discharge of 4,000 second-feet at Augusta.
  With Public Works funds the costs have been $78,799.93, all for
improvement. The expenditures were $75,560.13.
  With: regular funds the costs have been $639,575.89 for improve-
mient and $826,775.92 for maintenance, a total of $1,466,351.81. The
expenditures were $1,466;263.99.
  The total costs have been $718,375.82 for the new work, including
$78,799.93, Public Works funds, and $826,775.92 for maintenance, a
total of $1,545,151.74. The total expenditures were $1,541,824.12.
including $75,560.13 Public Works funds.
  Proposed operations.-The balance unexpended July 1, 1934, from
regular funds, $74,686.08, will be applied as follows:
Accounts payable, July 1, 1934 _____-------------------------------      $2, 561.98
Maintenance:
    Dredging at and below Augusta, Ga., with U. S. dredge
      Creighton, 41/2 months, July 1 to Nov. 15, 1934__..   $45, 000. 00
    Snagging with U. S. snag boat Macon below Augusta,
      Ga., 7/2 months, between July 1 and Dec. 1, 1934,
      and Apr. 1 and June 30, 1935. -                -       27, 124. 10
                                                                         72, 124. 10

      Total.____.________.                     -----------                        74, 686.08
   The balance unexpended on July 1, 1934, from funds from Na-
tional Industrial Recovery Act, $1,699,439.87, will be applied as
follows:
New work:
   Accounts payable July 1, 1934_____________________________        $3, 138. 80
   Construction of lock and dam at New Savan-
     nah Bluff, Ga., July 1, 1934, to Jan. 31,
    1936------------------------------------     $1,270, 444. 83
   Construction of open river regulating works
    between New Savannah Bluff and Savannah,
    Ga., July 1, 1934, to Jan. 31, 1936            ----------
                                                    425, 856. 24
                                                       . .-      1, 696, 301. 07

       Total--     --------------------------------------                     1, 699, 439.87
  The additional sum of $63,000 can be profitably expended for
maintenance during the fiscal year 1936, as follows:
436            REPORT OF CHIEF OF ENGINEERS,                             U. S. ARMY,              1934

Maintenance :
   Dredging at and below Augusta, Ga., with U. S. dredge Creighton,
      4 months, July 1 to Oct. 31, 1935-___-------   _---------------- $40, 000
    Snagging with U. S. snag boat Macon, Augusta to Savannah, Ga.,
      61/2 months, July 1 to Oct. 15, 1935, and Apr. 1 to June 30, 1936_ 23, 000
            Total                               ---------------------------------                                 63. 000

                                         Cost and finanoial summary
                                     MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934$-------------------------733,      98                                           0,55.
Cost of maintenance to June 30, 1934--_____---- -____- -826,    775. 92
      Total cost of permanent work to June 30, 1934                   559, 831. 90
                                                                   1----------,
Value of plant, materials, etc., on hand June 30, 1934------------       2, 474. 16

      Net total cost to June 30, 1934 _____--_--___________ 1, 562, 306. 06
Minus accounts payable June 30, 1934_ ..... _______ _--__ _- -   2, 561.98
      Net total expenditures     -----------------------------                                       1, 559, 744.,0$
Unexpended: balance June 30, 1934 ---------------------------                                            74, 686.O08
           Total amount appropriated to June 30, 1934                                                 , 634, 430. 16
                                                                                                     1-------------

           Fiscal year ending June 30              1930           1931           1932           1933               1934


Cost of new work------------------------------                 $11, 346. 54
Cost of maintenance------------------ $18, 695. 78              27, 171. 72   $98, 710. 68   $96, 439. 04        $44, 304. 81
        Total cost---------------------          18, 695. 78    38, 518. 26    98, 710. 68    96, 439. 04         44, 304. 81
Total expended------_---. -_-------_             41, 588. 67    34, 026. 96    79, 095. 86    93, 118. 94         38, 630. 03
Allotted- ----------------------------           45, 310. 18    61, 900.00     45, 500. 00   112, 911.98          74, 108. 00


Balance unexpended July 1, 1933_______________                                                           $39, 208. 11
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934____________________   $67, 000. 00
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933___________________ 28, 000. 00
                                                                                                            95, 00G. 00
      Amount to be accounted fr      -------------------------- 134, 208. 11
Deductions on account of revocation of-
   Allotment ...        __                           18,598. 01
   Impounded funds---------------------------2,         293.99
                                                                                                            20     92     00


      Net amount to be accounted for                ____                                                 113, 316. 11
Gross amount expended_---------       -      -____ 58, 728. 04
Less:
    Reimbursements collected----------- $1, 500. 00
    Receipts from sales _-- __-------__18, 598. 01
                                                      20, 098. 01
                                                                                                            38, 630. 03
      Balance unexpended June 30, 1934___________________                                                   74, 686. 08
Outstanding liabilities June 30, 1934_ .-.. __-------- ___                                          --       2, 561.98
            Balance available June 30, 1934_______________________                                          72, 124. 10

Amount that can be profitably expended in fiscal year ending June
                            - --- -- - -- --- -
30, 1936, for maintenance ____                                                                             63, 000. 00

    ' Exclusive of available funds.
                RIVERS AND HARBORS-SAVANNAH,                                                     GA., DISTRICT                           437
                                                    PUBLIC WORKS FUNDS

Cost of new work to June 30, 1934_....-.. __-                                            -----               -----__            $78, 799. 93
Cost of maintenance to June 30, 1934..                                              ..           ....

      Total cost of permanent work to June 30, 1934_...... __                                                            --      78, 799. 93
Value of plant, materials, etc., on hand June 30, 1934 .--------                                                                  -- 101. 00

      Net total cost to June 30, 1934_----------------------__                                                                 - 78, 698.93
Minus accounts payable June 30, 1934-- .....      -------   __.___                                                                3, 138.80

     Net total expenditures --    -   -
                                     ___   --   ___---__                                                                 -- 75, 560. 13
Unexpended balance June 30, 1934-----------------------                                                                    1, 699, 439. 87

           Total amount appropriated to June 30, 1934 -- ______-                                                              1, 775, 000. 00

   Fiscal year ending June 30                       1930                   1931               1932                1933               1934


Cost of new work---........ -----------------------------------------------------$78, 799. 93
Cost of maintenance--------------------------------------------------      --------------
             ...............------
Total expended---------------------------                                           ------------------------............---          75, 560.13
Allotted         -----------------------------------------------------                                                            1, 775, 000. 00


Amount allotted from National Industrial Recovery Act approved
  June 16, 1933-----------       -------------------------          $1,775,000.00
Gross amount expended-- ---------------           -    $75, 612.34
Less reimbursements collected ---- -      - ________--
                                              ---            52. 21
                                                                        75, 560. 13
      Balance unexpended June 30, 1934_ .__--.---------          - 1, 699,439. 87
Outstanding liabilities June 30, 1934____ ___           _____----------5, 303. 12
           Balance available June 30, 1934 ____.                                          _____--               ___           1, 694,136. 75
  CONSOLIDATED            COST AND FINANCIAL SUMMARY                                      FOR    SAVANNAH               RIVER      BELOW
                                           AUGUSTA

Cost of new work to June 30, 1934-------------------------                                                                     $811, 855. 91
Cost   of
        maintenance to June 30, 1934--__---__---------------                                                                    826, 775.92

      Total cost of permanent work to June 30, 1934_ ------   ___- 1, 638, 631. 83
Value of plant, materials, etc., on hand June 30, 1934____________      2, 373. 16

      Net total cost to June 30, 1934___ -------------                                                                        1, 641, 004. 99
Minus accounts payable June 30, 1934---------------                                                                -               5, 700. 78

     Net total expenditures                                     635, 304. 21
                                                            1,1________--_____________
Unexpended balance June 30, 1934-------------------------1,     774, 125.95

           Total amount appropriated tc, June 30, 1934-----                                                            __ 3, 409, 430. 16

   Fiscal year ending June 30                       1930                   1931               1932                1933               1934


Cost of new work-___  ----        __              -__-_-
                                                     -                   $11, 346. 54                             ---- $78, 799. 93
                                                                                                              -------.
Cost of maintenance ......-----------            $18, 695. 78             27, 171. 72      $98, 710. 68        $96, 439. 04          44, 304. 81

      Total cost.....--------- --                  18, 695. 78            38, 518. 26       98, 710. 68          96, 439. 04        123, 104. 74

Total expended----------_-----                     41, 588. 67            34, 026. 96       79, 095. 86          93, 118. 94        114, 190. 16
Allotted-------------------------                 45, 310. 18             61, 900. 00       45, 500. 00        112, 911.98        1,849, 108. 00
438      REPORT      OF CHIEF OF ENGINEERS                 U.   S. ARIMY,               1934

Balance unexpended July 1, 1933_                                                               $39, 208. 11
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934_ _---                         --              $67, 000
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933------------------------     28, 000
Amount allotted from National Industrial Recovery
Act approved June 16, 1933 _--                    1, 775, 000
                                                                -          -----         "1 o         1 nfl
                                                                                         IL,      V           . v



      Amount to be accounted for .....                                                   1, 909, 208. 11
Deductions on account of revocation of-
   Allotment---------------------                                   18, 598. 01
   Impounded funds       --                                         - 2,    293.99
                                                                                                20, 892. 00

      Net amount to be accounted for_1________----------                                 1, 888, 316. 11
'Gross amount expended_________________                         134, 340. 38
Less-
    Reimbursements collected_-.......           $1, 552. 21
    Receipts from sales_                        18, 598. 01
                                                                    20, 150. , 22
                                                                                               114, 190. 16

      Balance unexpended June 30, 1934__________________                                 1, 774, 125. 95
Outstanding liabilities June 30, 1934_________________                             __         7, 865. 10

      Balance available June 30, 1934 _____.          ____......                         1, 766, 260. 85

Amount that can be profitably expended in fiscal year ending
June 30, 1936, for maintenance           -                                                     63, 000. 00

3. WATERWAY BETWEEN BEAUFORT, S. C., AND ST. JOHNS RIVER,
    FLA. (BEAUFORT, S. C., TO CUMBERLAND SOUND SECTION)

  Location.-This section of the waterway connects Beaufort, S. C.,
with Fernandina, Fla. (See U. S. Coast and Geodetic Survey
Charts Nos. 3256 and 3257.) For description of waterway see page
630, Annual Report for 1932.
  Previous projects-Between Savannah, Ga., and Fernandina,
Fla.--Previous improvements in this section were authorized by the
River and Harbor Acts of August 2, 1882, August 11, 1888, July 13,
1892, and March 3, 1905.
  Under the previous projects prior to 1913 the cost and expenditures
were $194,496.96 for new work and $134,797.63 for maintenance, a
total of $329,294.59. For scope of previous projects of the inland
waterway between Beaufort, S. C., and St. Johns River, Fla., see
pages 1814, 1821-23 of the Annual Report for 1915.
  Existing project.-This provides for a channel 7 feet deep at mean
low water, with the following widths: Between Beaufort, S. C., and
Savannah, Ga., a width of not less than 75 feet, and between Savan-
nah, Ga., and Fernandina, Fla., 150 feet. The project also provides
for removing logs and snags from Generals Cut, Ga. The work is
to be accomplished by dredging, supplemented by training walls,
as necessary.
  The mean tidal range between Beaufort, S. C., and Fernandina,
Fla., is from 6 to 8 feet, with fluctuations from 11/2 to 21/2 feet due
to winds and lunar phases.
  1 Exclusive of available funds.
             RIVERS AND HARBORS-SAVANNAH,                              GA., DISTRICT               439

   The estimate of cost for new work, revised in 1930, was $230,200,
exclusive of amounts expended on previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $69,000.
   The main route from Beaufort, S. C., to Fernandina, Fla., is as
shown on the United States Coast and Geodetic Survey Charts Nos.
3256 and 3257.
   From Doboy Sound to Brunswick Harbor an alternate and more
protected route is via Darien River, Three Mile Cut, Atamaha River,
One Mile Cut, Buttermilk Sound, Mackay River, Back River, Clubb
Creek, and Plantation Creek.
   A shallow protected route with 3 feet project depth leaves Bruns-
wick Harbor and follows Jointer Creek, Jekyl Sound, Little Satilla
River, Umbrella Cut, Umbrella Creek, Dover Cut, Dover Creek,
Satilla River, Todd Creek, and Floyd Creek to Cumberland River.
A channel 5 feet deep and 50 feet wide connects Baileys Cut of
Satilla River and Dover Creek, Ga.
   On the Cumberland Sound section there is a loop 8 feet deep to
the wharves at the southern end of Cumberland Sound.
   The River and Harbor Act of August 8, 1917, consolidated into
"Waterway between Beaufort, S. C., and St. Johns River, Fla.",
the three former separate projects as shown below:

                                     River and H. Doc. Con- Ses-                   Remarks
           Section                  Harbor ActNo.           on                     Remarks
                                    approved-     No.  gress sion


                                   June 3, 1896       1295    53   3   Route no. 2 adopted.
Inland waterway between Sa-        Mar. 3, 1899        295    53   3   Route no. 1 adopted.
  vannah, Ga., and Beaufort,       July 25,1912       1 513   62   2   Modification of route no. 2 pro-
S. C.                                                                  vided for Archer Creek.
                                   Mar.    3,1925     2 178   68   2   Fixes the minimum width      at 75
                                                                        feet.
Waterway between Savannah,          July 13,1892         41   52   1   Original 7-foot channel.
   Ga.,and FernandinaFla.           Mar. 3,1905       1 450   58   2   Provided for Skidaway Narrows.
                                   a.,uly 25, 1912   11236    60   2   Incorporated alternate routes pre-
                                                                         viously improved as separate
                                                                         projects and the auxiliary chan-
                                                                         nels.
Channel between      St.   Johns   Mar. 4, 1913        898    62   2   No map published.
River   and    Cumberland
Sound, Ga. and Fla.

1 These documents contain published maps.
2Senate document.

  The River and Harbor Act of March 2, 1919, provided for work in
Generals Cut (H. Doc. No. 581, 63d Cong., 2d sess.), and in Back
River (H. Doc. No. 1391, 62d Cong., 3d sess.), and the River and
Harbor Act of July 3, 1930, provides for a channel from Baileys Cut
to Dover Creek (S. Doc. No. 43, 71st Cong., 2d sess.). These three
documents contain the latest published maps.
  Local cooperation.-Fully complied with.
  Terminal facilities.-Exclusive of terminal facilities at the ports
of entry, this improvement serves 102 wharves, of which 35 are pri-
vately owned but open to the public on equal terms. These facilities
are considered ample for existing water-borne commerce. For fur-
ther details see page 632, Annual Report for 1932.
440          REPORT OF CHIEF OF ENGINEERS,                                                U.   S.   ARMY,           1934

   Operations and results during fiscal year.-Maintenance dredging
with the U. S. dredge Creighton was in progress from October 20,
1933, to May 19, 1934, and resulted in the removal of 622,257 cubic
yards, between Savannah and Cumberland Sound, Ga., at a cost of
$61,519.42. Maintenance dredging with U. S. tug Brannanand hired
labor, from July 1 to 19, 1933, resulted in the removal of 27,583
cubic yards between Savannah and Brunswick, Ga., at a cost of
$2,011.35.
   The total cost of maintenance was $63,530.77. The total expendi-
tures were $56,135.70.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1932, at a saving of $1,863.80 under the estimated cost.
The improvement cuts have considerably shortened the original
length of this waterway. The training walls and closure dams
were completed in 1912 and are in satisfactory condition.
  The main route, alternate routes, and shallow protected routes had
project depths at the end of the fiscal year, except in the following
localities:

                                          Locality                                                  Project       Control-       Date de-
                                                                                                    depth         ling depth termined


Main route                                               ------------------------------                    7. O
   Brickyard Creek---------------------------------                                                                       5. 0   May 1934
   Archer Creek              -------------------------------------------------------                                      3. 8    Do.
   Fields Cut---              ------------------------------------------------------                                      6.0     Do.
   South Channel      ------------------------------------------------------                                              6.7    June 1934
   Wilmington River--------------------------------------------------                                                     5. 6     Do.
   Altamaha Sound --         ...
                            ------------              --.------------                               ----                  6.8    May 1934
AlternateAltrnae-rut
          route.... ------------------------------------------------                                       7.0 .....................-
                                                                                                           7.
   Back River.....                  ...--------------------------------------------------------                           6. 8   May 1934
Shallow protected routes -------------------------------------------                                       3.0        -          --
   Jointer Creek ---------------.-------      ____--__-_                                                                  2. 5   May 1934
   Todd Creek- --                 --------------------------------------------------                                      1.9       Do.



  The costs and expenditures have been $228,555.12 for new work
and $993,654.87 for maintenance, a total of $1,222,209.99.
  Proposed operations.-The balance unexpended July 1, 1934,
$58,858.56, will be applied to maintenance dredging to project di-
mensions with U. S. dredge Creighton, 51/2 months, November 15,
1934, to April 30, 1935.
  The additional sum of $60,000 can be profitably expended during
the fiscal year 1936 for maintenance dredging with U. S. dredge
Creighton, 6 months, from November 1, 1935, to April 30, 1936.
                                             Cost and financial summary

Cost of new work to June 30, 1934---------------------------$423,      052. 08
Cost of maintenance to June 30, 1934___----------------------  1, 128, 452. 50

         Total cost of permanent work to June 30, 1934                                                                   551, 504. 58
                                                                                                                      1------------,

Net total expenditures-----   --------------------------                                                              1, 551, 504. 58
Unexpended balance June 30, 1934--------------------------                                                                58, 858.56

          Total amount appropriated to June 30, 19341-------------                                                    1, 610, 363.14

   1 Reduced by $233,154.58 due to transfer of portion of waterway to Jacksonville district.
                RIVERS AND HARBORS-SAVANNAH,                                     GA.,       DISTRICT                  441
         Fiscal year ending June 30               1930            1931             1932 1          1933 1           1934


Cost of new work------                                   ----------------------------------
                                                                                   $8, 123. 71
Cost of maintenance- ..........
                       - - - -- $72, 077. 96                  $52, 653. 81       70, 475. 47     $51,535. 28       63, 530. 77
      Total cost----------------------..        72, 077. 96     52, 653.81       78, 599.18      51, 535. 28       63, 530. 77
Total expended ..--        --        ------     89, 486. 73     47, 800. 93      71, 707. 74     37, 429. 22       56, 135. 70
Allotted .---   --------    ----------.......   82, 000. 00     65, 000. 00     -9, 490. 54      39, 272. 50      107, 722. 64

  1 Maintenance reduced by $6,990.54 and $8,168.01 due to transfer of portion of waterway to Jacksonville,
Fla., district.

Balance unexpended July 1, 1933                                                                                $7, 271. 62
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934_____________________   $44, 100. 00
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933-------------------------70, 000. 00
                                                                                                            114, 100. 00

     Amount to be accounted for--------------------------_                                                  121, 371. 62
Deductions on account of revocation of-
   Allotment -------------------------------------- 3, 843. 54
   Impounded funds ---------------------            2, 533. 82
                                                                                                                6, 377. 36
      Net amount to be accounted for---------------------------
                                           _                                                                114, 904. 26
Gross amount expended-----------------------------69, 707. 26
Less:
    1Reimbursements collected------------- $9, 728.02
    Receipts from sales------------------- 3, 843. 54
                                                      13, 571. 56
                                                                                                               56, 135. 70

         Balance unexpended June 30, 1934------------------------                                              58, 858. 56
Amount that can be profitably expended in fiscal year ending June
                             -- -- -- --- - - --- -- --- -- --- --- ---
30, 1936, for maintenance                                                                                     60, 000. 00

           4. ALTAMAHA               OC(ONEE,       AND ()CMULGEE                        RIVERS,            GA.

  Location.-These rivers are located entirely within the State of
Georgia. (See U. S. Geological Survey map of Georgia.) For full
description of these rivers ,see page 636, Annual Report for 1932.
  Previous projects.---Prior to the present one, projects had been
adopted and expenditures made under them for the Altamaha River
by ' River and Harbor Acts of March 3, 1881, and September 19,
1890; for the Oconee River by River and Harbor Acts of June 18,
1878, September 19, 1890, anl March 3, 1905, and for the Ocmulgee
River, August 14, 1876, and September 19, 1890.
   Cost and expenditures were $760,610.26 for new work and $111,-
950.32 for maintenance, a total of $872,560.58.
   For further details see page 1815 of Annual Report for 1915.
   Existing project.-This provides for an appropriation of $40,000
per year for the Altamaha, Oconee, and Ocmulgee Rivers, to be
applied, following in general the methods which had been carried
on under the previous projects, to maintenance of 3-foot depth dur-
ing qrdinary summer low water and to the gradual increase on chan-
nel depth up to 4 feet, so far as practicable, without sacrificing the
   1Exclusive    of available funds.
442     REPORT OF CHIEF OF ENGINEERS,       U.   S.   ARMY,   1934


maintenance work. These methods are the removal of rock shoals
snags, overhanging trees, and other obstructions; the closing of the
incipient cut-offs; the revetting of caving banks; and the use of spur
dikes and training walls. The width of channel was not specified,
but it should vary from 60 to 100 feet, according to locality. This
project includes the entire Altamaha River, with a length of 137
miles, the lower 145 miles of the Oconee River, and the lower 205
miles of the Ocmulgee River. The tide at the mouth of the Alta-
maha River has a mean rise of about 6.4 feet. Just above the tidal
reach which extends about 33 miles above the mouth, the extreme
fluctuations due to floods attain a height of 17 feet above ordinary
low water. On the Oconee River at Dublin the ordinary fluctuations
attain a height of 22 feet and the extreme fluctuations a height of
34 feet above ordinary low water. On the Ocmulgee River at Macon
the ordinary fluctuations attain a height of 15 feet and the extreme
fluctuations a height of 26 feet above ordinary low water. There is
no estimated cost for improvement or for maintenance.
   The existing project was adopted by the River and Harbor Act of
July 25, 1912 (H. Doc. No. 443, 62d Cong., 2d sess.). The latest
published maps of these rivers are in the following documents:
Altamaha River, House Executive Document No. 283, Fifty-first
Congress, second session; Oconee River, House Executive Document
No. 211, Fifty-first Congress, first session; and Ocmulgee River,
House Executive Document No. 215, Fifty-first Congress, first
session.
   Terminal facilities.-Transfer of freight between the railways
and the river is practicable at Doctortown, Dublin, Hawkinsville,
and Abbeville. The facilities are considered ample for existing
commerce.
   Operations and results during fiscal year.-The U. S. snag boats
No. 1 and No. 2 operated periodically on the Altamaha River from
its mouth to The Forks, 137 miles, on the Oconee River from The
Forks to 122 miles above, and on the Ocmulgee River from The
Forks to 135 miles above, removing with hired labor 7,147 snags,
at a cost of $32,396.40, which resulted in clearing these rivers of the
worst obstructions.
   The total cost was $32,396.40, all for maintenance. The total
expenditures were -$48,571.61.
   Condition at end of fiscal year.-The existing project is of such
a nature that the percentage of completion cannot be stated. Chan-
nel depths have been increased by the excavation of rock shoals and
sand bars, by the construction of contraction and bank protection
works, and by the closing of cut-offs. Navigation has been rendered
safer by removal of obstructions. Many of the closing dams and
contraction and bank-protection works need repairs. The controlling
depths at ordinary summer low water, were about 2.0 feet for the
Altamaha, 1.0 foot from the mouth of the Oconee River to Milledge-
ville, Ga., and 1.6 feet from the mouth of the Ocmulgee River to
Macon, Ga. These depths are practicable throughout the year,
except during October and November, the usual low-water months.
   The costs have been $60,847.16 for new work and $629,274.47 for
maintenance, a total of $690,121.63. The total expenditures were
$685,300.37.
                RIVERS AND HARBORS-SAVANNAH,                                          GA., DISTRICT                    443
  Proposed operations.-The balance unexpended on July 1, 1934,
$38,763.04, will be applied as follows:
Accounts payable July 1, 1934-__-___-- _------------------------     $4, 821. 2;
Maintenance :
    Snagging with U. S. snag boat No. 1, 71/ months on
      the upper parts of the project on the Oconee and
      Ocmulgee Rivers, July 1 to Dec. 1, 1934, and Apr.
      15 to June 30, 1935__________--______---_         $13, 500. 00                 ____
   Snagging with U. S. snag boat No. 2, 6 months on the
      Altamaha and the lower portions of the Oconee
      and Ocmulgee Rivers, from July 1 to Oct. 31,
      1934, and Apr. 15 to June 15, 1935------     _-_ 20, 441. 78
                                                                   - 33, 941. 7(b

             Total           ------------------------------------------                                          38, 763. 04
   The additional sum of $30,000 can be profitably expended during
the fiscal year 1936, to be applied to snagging the entire system
with U. S. snag boats No. 1 and No. 0, July 1 to September 30, 1935,
and April 15 to June 30, 1936. This work will be necessary in order
to maintain the channels in suitable condition for navigation.
                                        Cost and financial summary

Cost of new work to June 30, 1934-    _ _______                                                             $821, 457. 42
Cost of maintenance to June 30, 1934------------------------                                                 741, 224. 79
     Total cost of permanent work to June 30, 1934                                      ---------       1 , 562, 682. 21
Minus accounts payable June 30, 1934------------------------                                                  4, 821. 26

     Net total expenditures -----------------------------                                                 1, 557, 860. 95
                                    ----
Unexpended balance June 30, 1934______________                                                                38, 763. 04

         Total amount appropriated to June 30, 1934__________--                                           1, 596, 623. 99

         Fiscal year ending June 30                        1930           1931         1932          1933            1934

Cost of new work -_... ------------------
Cost of maintenance- ---- ---- -----            _
                                                                        -----
                                                         $25, 403. 92 $26, 053. 71
                                                                                       ---------       -
                                                                                     $27,501. 88 $20,880.28
                                                                                                                   ---------
                                                                                                                   $32, 396. 40
Total expended--            __.----------------------    72, 694. 75   24, 033. 27   36, 228. 31    6, 625. 63    -48, 571. 61
Allotted -      .----------------------------           -2, 810. 18    27, 000. 00    5, 000. 00   10, 621. 14    -18, 941. 57


Balance unexpended July 1, 1933 ----------------------------                                                     $9, 133. 00
Amount allotted from War Department Appropriation
   Act approved Apr. 26, 1934________________________                                    $34, 000. 00
Amount allotted from War Department Appropriation
   A ct approved Mar. 4, 1933---------------------                                          30, 000. 00
                                                                                                                 64, 000.00

      Amount to be accounted for__________      ____---------------------------                                  73, 133. 00
Deductions on account of revocation of-
   Allotment       ----------------              __           81, 687. 27
   Impounded funds_        -----------------------              1, 254. 30
                                                                                                                 82, 941. 57

      Net amount to be accounted for__ ___________-__--__                                                    -- 9, 808. 57
Gross amount expended -------------------------   35, 335. 66
444      REPORT OF CHIEF OF ENGINEERS,         U.   S. ARMY,      1934

Less:
    Reimbursements collected ___________ $2, 220.00
    Receipts from sales------------------ 81, 687. 27
                                                        $83, 907. 27
                                                                       - $48, 571. 61
      Balance unexpended June 30, 1934------------------------- 38, 763.04
Outstanding liabilities June 30, 1934______________________      4,821. 26
      Balance available June 30, 1934 .   --                              33, 941. 78
Amount that can be profitably expended in fiscal year ending
June 30, 1936, for maintenance 1_____________________                    30, 000. 00

                         5. BRUNSWICK HARBOR, GA.

   Locatio.-The harbor entrance is 70 statute miles south of en-
trance to Savannah Harbor, Ga., and 25 statute miles north of
entrance to Fernandina Harbor, Fla. (See U. S. Coast and Geo-
detic Survey Chart No. 447.)
   Previous projects.-Adopted by acts of July 4, 1836, August 5,
1886, June 3, 1896, and June 13, 1902. The total cost and expendi-
tures under all these previous authorizations prior to 1907 were
 $643,465.18 for new work and $54,414.07 for maintenance, a total
of $697,879.25. For further details see page 1818 of Annual Report
for 1915.
   Exwisting project.-This provides for channels, as follows:
  30 feet deep and 500 feet wide through the bar;
  27 feet deep and 400 feet wide at Brunswick Point;
  27 feet deep and 350 feet wide in East River;
  27 feet deep and 300 feet wide in Turtle River;
  24 feet deep and 150 feet wide in Academy Creek; and
  A cut from Academy Creek to Turtle River, if later decided advisable.
  A channel in Back River 20 feet deep and 150 feet wide from St. Simion
    Sound to the mouth of Mill Creek.
   All depths referred to are mean low water. The mean tidal range
on the bar is 6.6 feet, at the city of Brunswick 7.2 feet, and at the
upper end of the harbor 7.6 feet, with minor fluctuations due to wind
and lunar effects.
   The estimate of cost for new work, revised in 1930, is $2,403,700,
exclusive of amounts expended on previous projects, of which $10,000
is to be contributed by local interests. The latest (1930) approved
estimate for annual cost of maintenance is $154,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1879, provided for the construction
of East River jetty (Annual Report for 1880, p. 959); the act of
March 2, 1907, provided for channels in the inner and outer harbors
of 30 feet depth at mean high water, with widths varying from 150
feet in Academy Creek to 400 feet across the outer bar; the exten-
sion of training wall in East River; and the construction of two
spur dikes (H. Doc. No. 407, 59th Cong., 1st sess.); and the act of
March 2, 1919, provided for increased widths and depths in the exist-
ing channel (H. Doc. No. 393, 64th Cong., 1st sess.), and the act of
July 3, 1930, provides for a 20-foot channel in Back River and in-
creased depths on the bar, Brunswick Point, Turtle River, and East
  1Exclusive of available funds.
         RIVERS AND    HARBORS-SAVANNAHI,     GA.,   DISTRICT     445
River (S. Does. Nos. 57 and 132, 71st Cong., 2d sess.). The two last-
mentioned documents contain the latest published maps.
   Local cooperation.-Fully complied with.
   Terminal facilities.-This improvement serves a developed water
front of about 2.1 miles, including a wharf 2,000 feet long at the
Southern Railway terminals and a wharf owned by the Atlantic
Refining Co., with a frontage of 377 feet on Turtle River, and exclud-
ing dredged docks. The city of Brunswick owns and maintains one
small municipal wharf, 225 linear feet of undeveloped frontage, and
the foot of all city streets, though it controls only two of them, the
rest having been leased to individuals or corporations. These facili-
ties are considered ample for existing commerce. (For further de-
tails see Port Series No. 10, Corps of Engineers.)
           OPERATIONS AND    RESULTS DURING   FISCAL YEAR

   Regular funds.-Maintenance dredging was carried on by hired
labor on the bar and in East River with the U. S. hopper dredge
Kingman, from November 6, 1933, to January 31, 1934, at a cost of
$44,386.51. Maintenance dredging by contract was in progress; in
East River from April 6 to May 3, 1934, at a cost of $45,387.61, a
total of $89,774.12. The expenditures were $91,155.21.
   Publio Works funds.-The U. S. hopper dredge Kingman oper-
ated on improvement dredging on the bar, between January 1 and
February 10, and June 4 and 30, 1934, at a cost of $47,749.68, ac-
complishing 3 percent of the project, and on maintenance dredging
in the inner harbor during these periods at a cost of $4,995.08. The
expenditures of Public Works funds were $32,531.45.
   The total costs were $47,749.68 for new work and $94,769.20 for
maintenance, a total of $142,518.88. The total expenditures were
$123,686.66.
   Condition at end of fiscal year.-The existing project is 88 per-
cent completed. Maintenance dredging is necessary to take care of
shoaling. The East River training wall and spur dike are in good
condition. The controlling depths at mean low water, as determined
in April and May 1934, were for Brunswick Bar, 27.6 feet over a
width of 250 feet; upper Turtle River, 27.4 feet over a width of 300
feet; lower Turtle River, 27.7 feet over a width of 225 feet; Bruns-
wick Point, 28.7 feet over a width of 300 feet; East River, 27.6 feet
over a width of 300 feet; Academy Creek, 11.5 feet over a width of
140 feet; and Back River, 13.3 feet. Upper and lower Turtle River
and Back River were completed in 1931. Brunswick Point and
East River were completed in 1932. To complete the project, dredg-
ing will be required on Brunswick Bar, as authorized by River and
Harbor Act of July 3, 1930.
   With Public Works funds, the costs have been $47,749.68 for new
work and $4,995.08 for maintenance, a total of $52,744.76. The
expenditures were $32,531.45.
   With regular funds, the costs have been $2,045,914.22 for new
work and $1,484,607.47 for maintenance, a total of $3,530,521.69.
The expenditures were $3,530,521.69.
   The total costs, all funds, have been $2,093,663.90 for new work
and $1,489,602.55 for maintenance, a total of $3,583,266.45. The
total expenditures were $3,563,053.14.
446         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                        1934

  Proposed opterations.-The balance unexpended on July 1, 1934,
of regular funds, $23,032.86, will be applied to maintenance dredging
in inner harbor with U. S. hopper dredge Kingman, during July
1934.
   The balance unexpended on July 1, 1934, from funds from Na-
tional Industrial Recovery Act, $147,468.55, will be applied as
follows:
Accounts payable July 1, 1934-------------------------------- $20, 212. 85
New work: Dredging Brunswick Bar with U. S. dredge Kingman
or similar plant, 5.3 months between July 1, 1934, and Feb.
3, 1935------     ----------------------------------------   127, 255. 70
           Total -------------------------------------------------                                                 147, 468. 55
  The additional sum of $191,000 can be profitably expended during
the fiscal year 1936, as follows:
New work: Completion of dredging on Brunswick Bar with U. S. hop-
per dredge Kingman or similar plant, 5 months between July 1 and
  Dec. 31, 1935---------     ------------------------- -------    $93, 000
Maintenance :
    Dredging Brunswick Point and Turtle River with U. S.
      dredge Kingnman, 2 months between July 1 and Dec.
      31, 1935   -------------------------------------- $48,000
    Dredging by contract or Government plant in inner har-
      bor between Apr. 1 and June 30, 1936--------------- 50, 000
                                                                   98, 000

          Total for all work------------------------------------                                                          191, 000

                                             Cost and financial summary
                                  MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934 -----------------------                                                     $2, 689, 379. 40
Cost of maintenance to June 30, 1934 --------------                                                             1, 539, 021. 54

           Total cost of permanent work to June 30, 1934----------                                              4,228, 400. 94
                                               - -   - - -- - -- - -- - -- - -- - -- - -- - -- - -- -- -
Net total expenditures 2                                    4, 228, 400. 94
Unexpended balance June 30, 1934---------------------------     23, 032. 86
           Total amount appropriated to June 30, 19341_-------_                                                 4, 251, 433.80

           Fiscal year ending June 30                          1930           1931          1932            1933            1934

Cost of new work-------......   --.---------- __      _$506, 759. 26 $375, 465. 28                      -----------------------
Cost of maintenance--..--...---.-.-------_$121, 701.82 49, 169. 19     19,199. 52                        $90, 648. 57     $89, 774.12
        Total cost_..--...--_-_            ..-----------   121, 701. 82   555, 928. 45   394, 664. 80     90, 648. 57      89, 774.12
Total expended- -__-      ..------------                   123, 871. 23
                                                        -_____            449, 704. 00   510, 508. 68     89, 890. 21      91, 155. 21
Allotted_- _-____----------------------.._222, 000. 00                    614, 000. 00   159, 000. 00     87, 095. 75     110, 088.05


Balance unexpended July 1, 1933__________                __                                                             $4, 100. 02
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934_____________________ $12, 700. 00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933___________________     99, 0'00.00
                                                                                                                    111     700nn 00n
                                                                                                                    11,             VV
                                                                                                                                   .VV.


           Amount to be accounted for_____                                                                          115, 800. 02
   1 Exclusive of $10,000 expended from contributed funds
   2   Exclusive of available funds.
                  RIVERS AND HARBORS-SAVANNAH,                                            GA.,      DISTRICT                          447
Deductions on account of revocation of-
  Allotment-----------------------------------                                                     $337. 47
   Impounded funds---------------------------1,                                                     274. 48
                                                                                                                            $1,    6,11. 95
      Net amount to be accounted for________    _____________                                                         114, 188. 07
Gross amount expended-            --    --   -  --   92, 330. 84
Less-
    Reimbursements collected_______________ $838. 16
    Receipts from sales __ -- _______---337. 47
                                                      1, 175. 63
                                                                                                                            91, 155. 21
          Balance unexpended June 30, 1934 ._____-_______-__-                                                               23, 032. 86
Amount (estimated) required to be appropriated for completion
of existing project 1_ ______________________________ __-                                                             120, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1936-
   For new work - - - - - - - - - -- - -- - -- - -- - -- - -- - -- - - -- -
                                                                        _                                                   93, 000. 00
       For maintenance 1____________-----                                                                                   98, 000. 00

           Total 1                              -------------------                                                    191, 000. 00

                                                 PUBLIC WORKS FUNDS


Cost of new work to June 30, 1934--------------------------                                                                     47, 749. 68
Cost of maintenance to June 30, 1934___ ____ - ______-_____4,                                                                       995. 08
      Total cost of permanent work to June 30, 1934                                       ------------                      52, 744. 76
Value of plant, materials, etc., on hand June 30, 1934___________                                                                -. 46
     Net total cost to June 30, 1934-------------------------                                                                   52, 744. 30
Minus accounts payable June 30, 1934_______ _______________                                                                     20, 212. 85
     Net total expenditures __________________      _____- -                                                                32, 531. 45
Unexpended balance June 30, 1934 ______________________                                                                    147, 468. 55
           Total amount appropriated to June 30, 1934 ____________                                                         180, 000. 00

           Fiscal year ending June 30                             1930       1931            1932              1933                 1934


Cost of new work----------------------------------------------------                                                              $47, 749. 68
Cost of maintenance-           ----------         ----------------------------------------------                                    4, 995. 08
       Total cost--------------                  ------------- -----------            ----------------------............           52,744.76
Total expended------------------------------                                             -------.------               ---          32, 531. 45
Allotted.....         ----------------                -----------------------------------------
                                                                                     ...............                       ..     180, 000. 00


Amount allotted from National Industrial Recovery Act approved
    June 16, 1933----------------------------------------------                                                       $180, 000. 00
Gross amount expended                               --
                                                _________--__                -            -_______-                 -_ 32, 531. 45
      Balance unexpended June 30, 1934_-             _____
                                                       --
                                                    -___     -______ 147, 468. 55
Outstanding liabilities June 30, 1934_.........___._________          26, 388. 91

            Balance available June 30, 1934-___------------------                                                          121, 079. 64
    'Exclusive       of available funds.
           91536-ENS 1934-29
448        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                            1934

        CONSOLIDATED COST AND FINANCIAL SUMMARY FOR,BRUNSWICK HARBOR

Cost of new work to June 30, 1934                   -----------------------------               $2, 737, 129. 08
Cost of maintenance to June 30, 1934-....                                                         1, 544, 016.62

      Total cost of permanent work to June 30, 1934----------                                     4, 281, 1451 70
Value of plant, materials, etc., on hand June 30, 1934_       _                                            -. 46

      Net total cost to June 30, 1934_--__                    4,281, 145. 24
Minus accounts payable June 30, 1934-------------------------    20, 212. 85

     Net total expenditures 1---  ---------                4,260,932. 39
Unexpended balance June 30, 1934--------------------------- 170, 501.41

        Total amount appropriated to June 30, 19341------------                                   4,431, 433. 80

        Fiscal year ending June 30                1930          1931         1932             1933             1934


Cost of new work._------------- -------       ___-     $506, 759. 26 $375, 465. 28 -------.                  $47, 749. 68
Cost of maintenance-- ----.--.--.--     -$121, 701. 82   49, 169. 19   19, 199. 52 $90, 648. 57               94, 769. 20
      Total cost..-     __...-..-........ 121,701. 82
                                     -.....                555, 928. 45   394, 664. 80      90, 648. 57      142, 518. 88
Total expended............-............... 123, 871. 23    449, 704. 00   510, 508.68       89, 890. 21      123, 686. 66
Allotted-.................................. 222, 000. 00   614, 000. 00   159, 000. 00      87, 095. 75      290, 088. 05



Balance unexpended July 1, 1933--------------------------- $4, 100. 02
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934-------------------- $12, 700. 00
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933----------------------- 99, 000. 00
Amount allotted from National Industrial Recovery Act
  approved June 16, 1933                              1------------------------80,000.
                                                                  00
                                                                       291, 700. 00
      Amount to be accounted for-------------------------                                             295, 800.02
Deductions on account of revocation of-
   Allotment-------------------------------------                                           337.47
   Impounded funds----------------------------                                           1, 274.48
                                                                                                            1, 611.95

      Net amount to be accounted for------    ----------- ------- 294, 188. 07
Gross amount expended -----------------------          124, 862. 29
Less:
    Reimbursements collected---------------$838.16
    Receipts from sales--------------------337. 47
                                                         1;175.63
                                                                    123, 686. 66

      Balance unexpended June 30. 1934__-------------------- 170, 501. 41
Outstanding liabilities June 30, 1934------------------------26,  388. 91

         Balance available June 30, 1934------------------------                                      144, 112. 50
Amount (estimated) required to be appropriated for completion of
                            -- ---- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
    existing project 2--                                                                      120, 000. 00
Amount that can be profitably expended in fiscal year ending June
  30, 1936:             - -- - -- - -- - -- - -- - -- - -- - -- - - -- -- - -- - -- - --
    For new work 2                                                                       93, 000.00
                       -- - - - - - - -
     For maintenance 2                                                                   98, 000. 00

         Total 2-       -       -      -      -      -      -          -_--_        --                    191, 000. 00
   SExclusive of $10,000 expended from contributed funds
   2 Exclusive of available funds.
          RIVERS AND HARBORS-SAVANNAH,             GA.,   DISTRICT       449

                     6. FANCY BLUFF CREEK, GA.

   Location.-The portion under improvement extends from South
Brunswick River, 2 miles west of Brunswick, Ga., up Fancy Bluff
Creek to near its headwaters, and thence by a cut 1,200 feet long to
the Little Satilla River. It has a length of 41/2 miles:. (See U. S.
Coast and Geodetic Survey Chart No. 157.)
   Existing project.-This provides for obtaining by dredging a
4-foot channel 50 feet wide at mean low water. The waterway has
a length of 41/2 miles. The mean tidal range is 7.2 feet, with minor
fluctuations. The original and latest approved estimate of cost made
in 1913 was $8,000. It was originally estimated that little or no
maintenance would be necessary. However, experience indicates that
$1,000 will be needed for this purpose about every 3 years. The
existing project was adopted by the River and Harbor Act of March
4, 1913 (H. Doc. No. 1342, 62d Cong., 3d sess.). The latest published
map is in the project document.
   TIerminal facilities.-None. Through waterway.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1914. The controlling depth at mean low water, as de-
termined in June 1934, was 2.5 feet. The costs and expenditures
have been $8,000 for new work and $4,200 for maintenance, a total
of $12,200.
   Proposed operations.-No funds available and no operations pro-
posed during the fiscal year 1935.
   The sum of $3,500 can be profitably expended during the fiscal
year 1936, to be applied to maintenance dredging of the channel
where it flows into Little Satilla River.
                        Cost and financial summary

Cost of new work to June 30, 1934-------------------------------       $8, 000
Cost of maintenance to June 30, 1934----------------------_--           4, 200

      Total cost of permanent work to June 30, 1934 ---------------- 12, 200
Net total expenditures--------------------------------------------   12, 200
Total amount appropriated to June 30, 1934-------------------------- 12, 200

Amount that can be profitably expended in fiscal year ending June 30,
1936, for maintenance-_                                              $3, 500
                         7. SATILLA RIVER, GA.

  Location.-This river has its headwaters in southern and south-
eastern Georgia, flows in a generally southeasterly direction, and
empties into the Atlantic Ocean through St. Andrew Sound. (See
U. S. Geological Survey map of Georgia.)
  Existing project.-This provides for the removal of snags and
similar obstructions from the mouth to Burnt Fort, a distance of 52
miles, and the removal of obstructions and the closing of incipient
cut-offs from Burnt Fort to Waycross, a distance of 114 miles. The
mean tidal range is 6.8 feet at the mouth and 3.2 feet at Burnt Fort.
The freshet variation at Waycross is about 12 feet.
  The original and latest approved estimate of cost, made in 1912, was
$20,000, divided equally between the two portions of the river. The
 450          REPORT OF CHIEF OF ENGINEERS,                                     U. S. ARMY, 1934

latest (1928) approved estimate for annual cost of maintenance is
 $2,000.
    The existing project was authorized by the following river and
harbor acts: The act of July 25, 1912, provided for the improvement
of the river from the mouth to Burnt Fort (H. Doc. No. 41, 62d
Cong., 1st sess.) ; the act of March 4, 1913, provided for the improve-
ment of the river from Burnt Fort to Waycross (H. Doec. No. 1113,
62d Cong., 3d sess.). The latest published map of the lower section
is the United States Coast and Geodetic Survey Chart No. 450, and
that of the second or upper section will be found in House Docu-
ment No. 1113, Sixty-second Congress, third session.
    Terminal facilities.-This improvement serves five main loading
points at which are small wharves. These facilities are considered
sufficient for existing commerce.
    Operations and results during fiscal year.-None.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1914 at a saving of $10,548 under the estimated cost. The
controlling depths in May 1934, as determined from reports of pilots
using the river, were as follows: The mouth to Owens Ferry, 9 feet;
Owens Ferry to Burnt Fort, 3.5 feet; thence to Waycross, the head of
navigation, about 1 foot. These depths are at ordinary summer low
water, except from the mouth to Owens Ferry, where the depth
refers to mean low water.
   The costs and expenditures have been $9,451.59 for new work and
$26,059.55 for maintenance, a total of $35,511.14.
   Proposed operations.-No funds available and no operations con-
templated during the fiscal year 1935.
   The sum of $3,000 can be profitably expended during the fiscal
year 1936, to be applied to maintenance snagging from the mouth of
the river to about 90 miles above, with the U. S. snag boat No. 1, 12/3
months from October 1 to November 20, 1935.
                                        Cost and financial summary

Cost of new work to June 30, 1934------------------------- $9, 451. 59
Cost of maintenance to June 30, 1934------------------------ 26, 059. 55
      Total cost of permanent work to June 30, 1934------------- 35, 511. 14
Net total expenditures   ------------------------------------    35, 511. 14
Total amount appropriated to June 30, 1934-------------------- 35, 511. 14

         Fiscal year ending June 30                    1930          1931          1932          1933            1934


Cost of new work     -----------------------
Cost of maintenance ..----.........----------.          $21. 79       $43. 90    $5, 359. 71   $2, 985. 74   .    -
Total expended--        ------------------
                               _-_ __20.
                                     _                        83       44. 86     5,359. 71     2, 985. 74   -------.-.
Allotted----------       ...---------------------   -2,000. 00     ---------      5,600. 00     2,311. 14


Amount that can be profitably expended in fiscal year ending June 30,
1936, for maintenance-------------------------------------           $3, 000

                            8. ST. MARYS RIVER, GA. AND FLA.

   Location.-This river has its source in the Okefenokee Swamp
and flows, first, in a southeasterly direction, and thence due north,
           RIVERS AND IIARBORS-SAVANNAH,             GA.,   DISTRICT      451

thence in a southeasterly direction, and empties into Cumberland
Sound about 3 miles north of Fernandina, Fla. (See U. S. Geo-
logical Survey map of Georgia.)
   Existing project.-This provides for a channel 17 feet deep at
mean low water with a width of 200 feet from the mouth to Cran-
dall, 12.5 miles, and for clearing the channel of snags to Kings
Ferry, 37 miles above the mouth, and as much farther as may be
practicable for a sum of $5,000. The upper limit reached by this
expenditure was Traders Hill, 59 miles above the mouth. The mean
tidal range is as follows: At the mouth, 5.9 feet; at the Atlantic
Coast Line Railway bridge, 55 miles above the mouth, 1.4 feet, with
minor fluctuations due to wind and lunar effects. Freshet fluctua-
tions on the upper portions are about 10 feet. The original and
latest approved estimate of cost of new work, made in 1912, was
$19,450. The latest approved estimate of cost, made in 1915, for
annual maintenance is $2,500.
   The existing project was adopted by the River and Harbor Act of
July 25, 1912 (H. Doc. No. 697, 62d Cong., 2d sess.). The latest
published map is in the project document.
   Terminal facilities.-The city of St. Marys owns and maintains a
wharf of 50 feet frontage. There is a private wharf having a
docking space of 200 feet on the city water front and two private
wharves having a total docking space of 340 feet on North River.
These facilities are considered ample for existing water-borne com-
merce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1914 at a saving of $3,762 under the estimated cost. The
controlling depths at mean low water, as determined in May 1934,
from reports of steamboat pilots, were as follows: The mouth to St.
Marys, 15.7 feet; St. Marys to Kings Ferry, 12.0 feet; Kings Ferry
to the Atlantic Coast Line Railroad bridge, mile 55, 6. feet; and
Atlantic Coast Line bridge to Traders Hill, mile 59 (the head of
navigation), 4 feet. These depths are practicable throughout the
year. The costs and expenditures have been $15,688.36 for new work
and $47,136.44 for maintenance, a total of $62,824.80.
  Proposed operations.-No funds available and no operations pro-
posed during the fiscal year 1935.
  The sum of $3,000 can be profitably expended during the fiscal
year 1936, to be applied to maintenance snagging from the mouth
of the river to the head of navigation, 55 miles, with U. S. snag boat
No. 1, 12/ months between November 20, 1935, and January 10, 1936.
                         Cost and financial summary

Cost of new work to June 30, 1934 _--................            $1.5, 688. 36
Cost of maintenance to June 30, 1934---------------------------- 47, 136. 44

      Total cost of permanent work to June 30, 1934--         _ -62,  824. 80
Net total expenditures-----------------------------------------62, 824. 80
Total amount appropriated to June 30, 1934----------------------- 62, 824. 80
452         REPORT        OF CHIEF OF ENGINEERS,                                   U.   S.   ARMY,      1934


         Fiscal year ending June 30                          1930          1931          1932         1933             1934

Cost of new work------.--------------------------------------------------------
Cost of maintenance____--       -_
                              __--   _----------------------- $5, 514.46 $2, 560. 34
Total expended      ------------------------------------------                          5,450.00     2, 624.80   ----------
Allotted...---   ---------------------------------                  ------------        6, 000. 00   2, 074.80     ..........


   Amount that can be profitably expended in fiscal year ending
    June 30, 1936, for maintenance--     _----------- ------------ $3, 000. 00

                                 9. FERNANDINA HARBOR, FLA.

   Location.-The harbor entrance is 221/2 statute miles north of the
entrance to' Jacksonville Harbor, Fla., and 95 statute miles south of
the entrance to Savannah Harbor, Ga. (See U. S. Coast and Geo-
detic Survey Chart No. 453.)
   Existing project.-This provided originally for a 19-foot channel
over the outer bar at mean low water by means of two jetties, sup-
plemented by dredging. The jetties are constructed of stone, the
north jetty being 19,000 feet long and the south jetty 11,000 feet long.
As a result of the construction of the jetties, a channel 26 feet deep
was obtained over the outer bar, and the project as it now exists is
therefore to provide for the extension of this 26-foot channel to the
south end of the Florida Terminal Co. development, 400 feet wide up
to Calhoun Street and 300 feet above that point. The length of the
section included in the project is 7 miles. The mean tidal range on
the bar is 5.9 feet and in the inner harbor 6 feet, with minor fluctua-
tions due to wind and lunar effects.
   The estimated cost of new work, revised in 1925, was $3,196,400.
The latest (1925) appnoved estimate of annual cost of maintenance
is $12,500.
   The existing project was authorized by the following river and
harbor acts: The act of June 14, 1880, provided for entrance jetties
 (Annual Report for 1879, p. 792) ; the act of July 13, 1892, provided
for the 19-foot depth (Annual Reports for 1891, pp. 1565-1598; for
1896, p. 1289) ; the act of March 2, 1907, provided for the improve-
ment of the inner harbor (H. Doc. No. 388, 59th Cong., 1st sess.);
the act of June 25, 1910, provided for the combination of the im-
provement of Fernandina Harbor and Cumberland Sound under the
general heading of Fernandina Harbor; the act of March 3, 1925,
provided for the 26-foot channel (H. Doc. No. 227, 68th Cong., 1st
sess.). The last-mentioned document contains the latest published
map.
   Terminal faeilities.-There is a total of 4,300 linear feet of dock-
ing space located along the 2 miles of water front. The present
facilities are considered ample for existing commerce. (For further
details see Port Series No. 8, Corps of Engineers.)
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1927 at a saving of $7,508 under the estimated cost.                                                            The
construction of two stone jetties, supplemented by dredging on the
outer bar, was completed in 1905. The jetties and most of the spur
dikes are in good condition. The controlling depths at mean low
                    RIVERS AND HARBORS-SAVANNAH,                                                GA., DISTRICT                              453
water, as determined in May 1934, were as follows: In the inner
harbor, 25 feet; through the outer harbor, 25.9 feet.
  The costs and expenditures have been $3,188,892.15 for new work
and $728,085.28 for maintenance, a total of $3,916,977.43.
  Proposed operations.-No funds available and no operations pro-
posed during the fiscal year 1935.
  The sum of $55,000 can be profitably expended during the fiscal
year 1936, to be applied to maintenance dredging in the inner har-
bor by contract between March 1 and June 30, 1936.
                                              Cost and financial summary

Cost of new work to June 30, 1934---------------------------                                                          $3, 188, 892. 15
Cost of maintenance to June 30, 1934 ________________________                                                             728, 085. 28
      Total cost of permanent work to June 30, 1934----------                                                           3, 916, 977. 43
Net total expenditures_  __-..                                   ____________-____                                      3, 916, 977. 43
Total amount appropriated to June 30, 1934-----------------_                                                            3, 916, 977. 43

           Fiscal year ending June 30                            1930              1931            1932            1933                   1934


Cost of new work               __---------.-------------...
Cost of maintenance--- -----------------                         $420. 53          $199.70       $1, 722. 26 ---------        __-------
Total expended.--_              ------                 -           418. 48          192. 75       1, 722. 26   ----------

Allotted----------------------------3,                             000. 00      54, 755.17 -52, 500. 00           -777. 74 ------------


Amount that can be profitably expended in fiscal year ending
June 30, 1936, for maintenance __________-    -    -_______-                                                               $55, 000. 00

    10. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                                   (GENERAL)

     The cost of work during the year amounted to $15,681.14; the
expenditures were $15,912.24. The balance unexpended June 30,
1934, will be applied as needed during the fiscal year 1935 to pay-
ment of expenses incurred in connection with the above items.                                                                              The
additional sum of $20,000 can be profitably expended during the
fiscal year ending June 30, 1936.
                                              Cost and financial summary

Cost of maintenance to June 30, 1934- --- __-...-------                                                              $131, 387. 81
                                                                                                                  -___--
Minus accounts payable June 30, 1934___----------__-------                                                              1, 987. 63

     Net total expenditures------------------------------                                                                   129, 400. 18
Unexpended balance June 30, 1934_ ...---.------------    -                                                                   20, 023. 47
            Total amount appropriated to June 30, 1934_-- __-_                                                              149, 423. 65

           Fiscal year ending June 30                            1930              1931            1932            1933                   1934


Cost of new work------                        ------------               -----------------------------------------
Cost of maintenance_--------------                  -----     $9, 839. 37     $19, 462. 03      $49, 406. 39   $33, 943. 96        $15, 681. 14

Total expended-----------------------                           9, 921, 74      17, 784. 04      48, 747. 07    34, 552. 94          15, 912. 24

Allotted.--                                                    10, 000. 00        16, 500. 00
                                                              "--------------------------        45, 000. 00    39, 402. 47          25, 521. 18
454         REPORT OF CHIEF OF ENGINEERS, U.                                              S. ARMY,         1934

Balance unexpended July 1, 1933--------         ----------- _______ $10,414. 53
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934_______________--____         $14, 000. 00
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933 ---  __------------            12, 000. 00
                                                                       26, 000. 00
     Amount to be accounted for ---      _-------------------36,                                                          414. 53
Deductions on account of revocation impounded funds- --                                             __--          -       478. 82
         Net amount to be accounted                       for ______________                                          35, 935. 71
Gross    amount expended__      -                          -     -___------------15,                                      912. 24
      Balance unexpended June 30, 1934___________-                                                __-__-              20, 023. 47
Outstanding liabilities June 30, 1934                                                                                     987. 63
                                                                                                                       1__________---------1,
         Balance      available June 30, 1934 __---                               __------------                      18, 035. 84
Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1_     --------              __-.                                                          20, 000. 00
              11. Other projects for which no estimates are submitted
                    [Commercial statistics for these projects are given in pt. 2 of report]

                                                                For last         Cost and expenditures to
                                                                  full                 June 30, 1934                  Estimated
                                                                report                                                  amount
                    Name of project                             see an-                                               required to
                                                                  nual                            Mainten-             complete
                                                                report           New work          ance
                                                                 for-

Savannah River at Augusta, Ga.l----------------                   1929           $200, 556. 30     $17,443. 70             (2)
Savannah River above Augusta, Ga.1-------------                   1929              69, 599. 99      5,870. 01              3 $6, 000
Sapelo Harbor, Ga.1 _     ---------------------                   1929              17, 905. 73     17, 094. 27            (2)
Darien Harbor, Ga.4 ..                                            1929           5 199, 722. 65     42, 343. 28            (2)

  1 Project recommended for abandonment in H. Doc. No. 467, 69th Cong., 1st sess.
  2 Completed.
  3 About 84 percent completed. Owing to construction of 2 power dams, which have submerged much of
the work under the present and former projects, this improvement cannot be completed as originally plan-
ned.
  4 Channel adequate for commerce.
  5 Includes $54,929.44 expended on Doboy bar.
Status of reports called for by river and harbor acts and committee resolutions

                                                              Transmitted                 Document no.            Recommenda-
         Locality                Authorization act            to Congress                 Document no.ion


Altamaha River system,        Rivers and Harbors .                       .
  the Ocmulgee River to         Act, July 3, 1930.
  Macon, Ga., and the
  Oconee River to Mill-
  edgeville, Ga.
Atlantic intracoastal        .....-do ....            .   .         .        .        .
  waterway to the Gulf
  intracoastal waterway
  across southern Geor-
  gia or northern Flor-
  ida.
Cumberland Sound, Ga.         Rivers and Harbors ..
  and Fla., to Missis-          Act, Jan. 21, 1927.
  sippi River waterway.
Ogeechee River, Ga., to       Rivers and Harbors May 2,1934 ........---------.........--...                       Unfavorable.
  Midville, Ga.                 Act, July 3, 1930.
Ogeechee River, Ga.           Flood Control Act,--------------------
  (preliminary examina-         May 4, 1934.
  tion for flood control).
St. Marys River to Gulf       Rivers and Harbors ...-....................
  intracoastal waterway         Act, July 3, 1930.
  by most practicable
  route.
Savannah Harbor, Ga-         ..... do .............           Mar. 5, 1934         House, 276, 73d Cong.,         Favorable.
                                                                                          2d sess.
Savannah River at Au- ..           do ..
  gusta, Ga.

   1Exclusive of available funds.
         RIVERS AND HARBORS-JACKSONVILLE,                      FLA.,   DISTRICT      455

   IMPROVEMENT OF RIVERS AND HARBORS IN THE
          JACKSONVILLE, FLA., DISTRICT
   This district includes the waterways and harbors of the State of
Florida east of and including the Aucilla River, except Fernandina
Harbor, St. Marys River, Ga. and Fla., and their tributaries; it also
includes the watersheds of the Suwannee and Withlacoochee Rivers
in the State of Georgia.
  District engineer: Maj. B. C. Dunn, Corps of Engineers.
   Division engineer: Lt. Col. Warren T. Hannumn, Corps of En-
gineers.
                                      IMPROVEMENTS

                                       Page                                          Page
1. Waterway between Beau-                    12 Key West Harbor, Fla .- __          493
       fort, S. C., and St. Johns             13. Caloosahatchee River and
       River, Fla. (Cumberland                      Lake Okeechobee drainage
       Sound to St. Johns River                     areas, Fla __-______-            496
       section) ----------------        455   14. Charlotte Harbor, Fla.-.-          508
  2. St. Johns River, Fla., Jack-             15. Sarasota Bay, Fla__ -___           510
       sonville to the ocean____        457   16. Tampa Harbor, Fla __ ____          511
  3. St. Johns River, Fla.,                   17. St. Petersburg Harbor, Fla_        518
       Palatka to Lake Harney_          462   18. Channel from Clearwater
4. Oklawaha River, Fla ___-__          465         Harbor through Boca
5. Operating and care of lock                      Ciega Bay to Tampa Bay,
       and dam in Oklawaha                         Fla    -_____                     520
       River at Moss Bluff, Fla_        468   19. Anclote River, Fla ________        522
6. Intracoastal w a t e r w a y              20. Withlacoochee River, Fla__         523
       from Jacksonville, Fla., to            21. Removing the water hya-
       Miami, Fla____________--         469         cinth from navigable
7. Fort Pierce Harbor, Fla__ _         477         waters in the State of
8. Lake Worth Inlet, Fla_____          482          Florida                __- -
                                                                        -_________   526
9. Hollywood      Harbor     (Port          22. Examination, surveys, and
       Everglades), Fla ___---          4841       contingencies (general) __        528
10. Miami Harbor         (Biscayne           23. Other projects for which no
       Bay), Fla______________          486        estimates are submitted.__        529
11. Miami River, Fla .      -......     492

1. WATERWAY BETWEEN BEAUFORT, S. C., AND ST. JOHNS RIVER,
    FLA. (CUMBERLAND SOUND TO ST. JOHNS RIVER SECTION)

  Location.-This section of the intracoastal waterway connects
Cumberland Sound, Ga. and Fla., with the St. Johns River, Fla.
(See U. S. Coast and Geodetic Survey Chart No. 3257.)         For
description of the waterway see page 630, Annual Report for 1932.
  Previous projects.-The first project for the improvement of this
section of the waterway was authorized by the River and Harbor
Act of May 23, 1828. The project was modified by the act of June
23, 1874. Under the previous projects prior to 1913 the cost and
expenditures were $97,565.55, all for new work. For scope of pre-
vious projects, see Annual Report for 1915, page 1823.
  Existing project.-This provides for dredging and maintaining a
channel 100 feet wide and 7 feet deep at mean low water from Fer-
nandina Harbor to St. Johns River, a distance of 25 miles. The
mean range of tide is 6 feet at Fernandina and 4 feet in the St.
Johns River, with fluctuations from 1.5 to 2.5 feet due to winds
and lunar phases. The estimate of cost for new work, made in 1913
was $101,000, exclusive of amounts expended on previous projects.
456            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                           1934

The latest (1913) approved estimate for annual cost of maintenance
is $1,000.
   The existing project was authorized by the River and Harbor Act
approved March 4, 1913 (H. Doc. No. 898, 62d Cong., 2d sess.). No
map published.
   Terminal facilities.-Exclusive of terminal facilities reported for
Fernandina Harbor, there are no terminals along this waterway.
   Operations and! results during fiscal year.-The transfer of this
reach of the Intracoastal Waterway from the Savannah district to
the Jacksonville district was approved on March 6, 1934. There
were no operations and no expenditures during the fiscal year.
   Condition at end of fiscal year.-The existing project was com-
pleted in the calendar year 1915 at a saving of $219 under the esti-
mated cost. The controlling depth at mean low water is 7 feet with
reduced width in Sisters Creek. The total cost and expenditures
under the existing project have been $135,589.03, of which $100,781.08
was for new work and $34,807.95 was for maintenance.
   Proposed operations.--The balance unexpended July 1, 1934
 ($22,000), will be applied to dredging with United States plant or
with leased plant, 2 months, August-September 1934, removing shoals
as required.
   The additional sum of $18,000 can be profitably expended during
the fiscal year 1936, to be applied to maintenance dredging with U. S.
dredge Congaree and attendant plant, 11/2 months, May-June 1936,
removing shoals as required.
                                             Cost and              /nancial summary
Cost of new work to June 30, 1934 -----------------------------  $198, 346. 63
Cost of maintenance to June 30, 1934----------------------------   34, 807. 95
           Total cost of permanent work to June 30, 1934------------233, 154. 58
Net total expenditures ---------------------------------------- 233, 154. 58
Unexpended balance June 30, 1934------------------------------22:, 000. 00

           Total amount appropriated to June 30, 1934---------------                                                     255, 154. 58

           Fiscal year ending June 30                              1930                   1931     1932          1933              1934


Cost of new work._.-
Cost of maintenance ----------               ------------...........         ___________......   $6, 990. 54   $8, 168. 01   ----------
Total expended------------------------.........                    .....            ...           6, 990. 54    8,168. 01    -
Allotted-_ ---------------               -                _-----           ------------          16, 990. 54   18, 168. 01       $22, 000. 00

  1Prior to Apr. 1, 1934, funds for this section of waterway were included in allotments for entire waterway
in Savannah, Ga., district.

Amount allotted from War Department Appropriation Act approved
  Apr. 26, 1934 -------------------------------------------------- $22, 000
Balance unexpended June 30, 1934_-----------------------------    - 22, 000
Amount that can be profitably expended in fiscal year ending June
    30, 1936, for maintenance                                          ------------                              ---               18, 000

    1Exclusive of available funds.
       RIVERS AND HARBORS-JACKSONVILLE,         FLA.,   DISTRICT   457
    2. ST. JOHNS RIVER. FLA. ; JACKSONVILLE       TO THE OCEAN

   Location.-This river rises in the marshes of Brevard County,
Fla., near the east coast, and flows northwestwardly to Jacksonville,
thence eastwardly into the Atlantic Ocean, 122 miles south of
Savannah River. Its total length is about 285 miles. (See U. S.
Coast and Geodetic Survey Chart No. 577.)
   Previous projects.-Adopted by acts of June 14, 1880, and June 3,
1896. The cost and expenditures were $4,063,535.91, of which $3,520,-
137.39 was for new work and $543,398.52 was for maintenance.
For further details see page 1823 of Annual Report for 1915.
   Existing project.-This provides for a channel 30 feet deep at local
mean low water from the ocean to Jacksonville, following generally
the line of the 24-foot channel secured under the previous project,
the width to be 300 feet in the straight reaches, increasing to as much
as 600 feet in the bends except at Dames Point, which is to be 1,200
feet, and through the jetties, with an anchorage basin opposite May-
port (33/4 miles from the, entrance), 800 feet in width beyond the
channel limits, by jetty and mattress work at the entrance, dredging
and rock excavation in the river, dredging between the jetties and on
the bar, and stone training walls and shore protection in the river,
with possibly a cut-off dam in Mill Cove Channel (121/2 miles from
the entrance), and for removing rock and overlying material between
the 24-foot curve and the pierhead line at Jacksonville from the
Florida East Coast Railroad bridge to Hogans Creek, a distance of
6,080 feet, to a depth of 24 feet at mean low water. The project is
subject to such modification in details as the Chief of Engineers may
deem advisable.
   Two converging rubblestone jetties have been built at the entrance.
The north jetty is 14,300 feet long and the south jetty is 11,183 feet
long. The jetties are parallel and 1,600 feet apart for a distance of
4,022 feet from the sea ends. Stone training walls have been built at
seven localities, involving about 7 miles of this class of structure.
Stone revetments at five localities provide about 3.5 miles of shore
protection. The training walls and revetments are located between
Dames Point and Wards Bank, near the inner ends of the jetties.
   The length of section included in the project is 28 miles. The
mean tidal range is 5.3 feet on the bar, 4.3 feet at Mayport, 2.2 feet
at Dames Point (14 miles above the entrance), and 0.9 foot at Jack-
sonville. The extreme range is 7.4 feet on the bar, 6.5 feet at May-
port, 4 feet at Dames Point, and 2.8 feet at Jacksonville. Strong
northeasterly winds raise the water level about 2 feet at Mayport and
2 feet at Jacksonville. Strong southwesterly winds lower the water
about 11/2 feet at Mayport and 1 foot at Jacksonville.
   The estimate of cost for new work revised in 1930 is $3,965,000,
exclusive of amounts expended on previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $450,000.
   The existing project was adopted by the following river and har-
bor acts: The act of June 25, 1910, provided for the main channel
 (H. Doc. No. 611, 61st Cong., 2d sess.); and the act of March 2,
1907, provided for the harbor at Jacksonville (H. Doc. No. 663, 59th
Cong., 1st sess.). The River and Harbor Act of June 5, 1920, com-
bined these two projects, and the River and Harbor Act of July 3,
1930, provided for widening the bend at Dames Point (H. Doc. No.
458    REPORT OF CHIEF OF ENGINEERS,        U.   S.   ARMY,   1934

483, 70th Cong., 2d sess.). The latest published maps are in the first-
and last-mentioned documents.
   Terminal facilities.-These consist of 17 general freight wharves,
16 of which have both railway and highway connections and 1 has
highway connection only; of 56 piers for general freight and boat-
yard purposes, 36 have both railway and highway connections and
20 have highway connection only. The Jacksonville municipal
terminals at Talleyrand, constructed and equipped at a cost of over
$3,000,000, consist of 3 piers, earth fill in steel-sheet piling, with
wooden aprons and 3 galvanized-iron warehouses over 1 of them and
1 over another, and all connected with large storage yard. The
facilities are considered adequate for the needs of the present com-
merce. (For further details see Port Series No. 8, Corps of
Engineers.)
             OPERATIONS AND RESULTS DURING FISCAL YEAR

   Regular funds.-Contract for the repair of the sea ends of the
jetties, which was in progress at the beginning of the fiscal year,
was completed on July 29, 1933. The cost was $21,897.93 for mainte-
nance. A contract was entered into on May 15, 1934, for repairs to
the north jetty from station 56+00 to 73+00. Work was begun on
June 4, 1934, and was in progress at the close of the fiscal year. The
cost was $10,292.38 for maintenance.
   From July 6 to October 7, 1933, the U. S. hopper dredge Com-
stock removed 590,778 cubic yards (bin measurement) from Wards
Bank Cut. The cost was $41,886.49 for maintenance. The U. S.
hopper dredge Manhattan was engaged in maintenance dredging in
Wards Bank Cut from September 28, 1933, to January 13, 1934, and
in the channels between the entrance and Mayport from May 3, 1934,
to the close of the fiscal year. There were removed 1,931,928 cubic
yards (bin measurement) of material at a cost of $127,812.77 for
maintenance. Maintenance dredging operations in progress at the
beginning of the fiscal year with the U. S. pipe-line dredge Welatka
were continued to October 20, 1933. A total of 978,819 cubic yards
of material was removed from Clapboard Creek Cut, White Shells
Cut, Mile Point Cut, St. Charles Creek Cut, and Dunns Creek cut.
The cost was $73,648.12, all for maintenance. The U. S. pipe-line
dredge Pullen was engaged in maintenance dredging from December
15, 1933, to the end of the fiscal year. A total of 1,367,750 cubic
yards of material was removed from Dunns Creek Cut, Brills Cut,
and Dames Point Cut. The cost wast $97,460.77, all for maintenance.
The total excavation from the ship channel by all dredges operating
on funds from regular appropriations was 4,869,275 cubic yards and
the total cost was $340,808.15, for maintenance.
    From August 10-17, 1933, U. S. derrick boat D-1 removed 4,540
cubic yards of material from in front of and adjacent to the United
States Engineer Department dock at Mayport, at a cost of $996.41.
   Public Works funds.-Dredging under the existing project, in-
volving the widening and easing of the bends in the ship channel
at Browns Creek, Clapboard Creek, and Fulton Cuts was begun
under contract on September 25, 1933, and was completed January
24, 1934. The width of channel was increased 300 feet in the bend
at Browns Creek and 450 feet in the bend at Clapboard Creek.
       RIVERS AND HARBORS-JACKSONVILLE,              FLA., DISTRICT        459

There were removed 3,346,088 cubic yards of material at a cost of
$290,013.37, which was for new work.
   Under regular funds the cost during the fiscal year was $7,395.30
for new work and $398,386.94 for maintenance, a total of $405,782.24;
the expenditures were $343,320.97. Under Public Works A dminis-
tration funds the cost and expenditures were $290,013.37 for new
work. The grand total cost under all funds was $695,795.61, of
which $297,408.67 was for new work and $398,386.94 was for mainte-
nance; the expenditures were $633,334.34.
   Condition at end of fiscal year.-The existing project is about 99
percent completed. All original dredging has been completed ex-
cept that necessary to complete the deepening of the Mayport an-
chorage basin from 27 to 30 feet, which is 72 percent completed.
   Project depth of 30 feet at local mean low water, with reduced
widths at several localities, was available throughout the fiscal year.
Night navigation over the improvement continues to increase. The
project depth of 24 feet, opposite the city of Jacksonville, between
the Florida East Coast Railroad bridge and Hogans Creek, has been
maintained. The material dredged from the north side of Wards
Bank Cut and deposited adjacent to and on the north side of the
north jetty, in the vicinity of the Fort George Inlet encroachment,
has effectively protected the structure.
   Under regular funds the total cost of the existing project has
been $10,884,825.82, of which $3,667,449.51 was for new work and
 $7,217,376.31 was for maintenance; the total expenditures have been
 $11,549,128.54. The total costs and expenditures under the existing
project with funds allotted by the Public Works Administration
have been $290,013.37, all for new work. The grand total cost of the
existing project under all funds has been $11,174,839.19, of which
 $3,957,462.88 was for new work and $7,217,376.31 was for main-
tenance. The grand total expenditures have been $11,839,141.91.
    Proposed operations.-The balance unexpended and accounts re-
ceivable on July 1, 1934 ($359,797.12), will be applied as follows:
Accounts payable June 30, 1934___ ______-__________________$53,          089. 65
Maintenance:
    Completion during July 1934 of contract for re-
      pairs to north jetty--------------------------$28, 260.00
    Dredging with U. S. dredge Pullen and attendant
      plant, 5 months, July-November 1934, removing
      shoals throughout the project as required _____ 72, 580. 00
    Dredging with U. S. hopper dredge Manhattan in
     Bar Cut between the jetties, 21/2 months, July-
      September 1934------------------------------     62,000. 00
    Repair of inner end of north jetty by hired labor,
      August-October 1934-------------------------- 30, 000. 00
    Completion during September 1934 of general sur-
      vey of St. Johns River from Jacksonville to the
      sea------------------------------------------     5,000. 00
    Plant construction and betterments--------------108, 867.47
                                                      -------       306, 707.47

      Total------------------- ------------------------------       359, 797. 12
  The balance unexpended on July 1, 1934, from allotment from
the National Industrial Recovery Act of 1933 ($11,860.59), is avail-
able for transfer.
  The additional sum of $325,000 can be profitably expended during
the fiscal year 1936 as follows:
460         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY                                              1934

Maintenance :
   Dredging with U. S. dredge Pullen and attendant plant, 12
      months, removing shoals throughout the project as required__ $200, 000
   Dredging with rented U. S. hopper dredge from the entrance
      to Mayport, 6 months, during the period January-June 1936__ 125, 000

            Total --------------------------------------------------                                       325, 000
                                       Cost and financial summary
                                MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934-------------------------- $7, 187, 586. 90
Cost of maintenance to June 30, 1934 ------------------------- 7, 760, 774. 83

      Total cost of permanent work to June 30, 1934--------- 14, 948, 361. 73
Value of plant, materials, etc., on hand June 30, 1934           679, 466. 59    --------
      Net total cost to June 30, 1934__________________                                           15, 627, 828. 32
Plus accounts receivable June 30, 1934_________..
                                              ..   ____..                                              37, 925. 78

     Gross total costs to June 30, 1934_.........  ___-____                                       15, 665, 754. 10
Minus accounts payable June 30, 1934___------------ ---                                                53, 089. 65

      Net total expenditures ______-_________--    -      -_  15, 612, 664. 45
Unexpended balance June 30, 1934_-.....     __-------------__     321, 871. 34
        Total amount appropriated to June 30, 1934-----------                                      5, 934, 535. 79

   Fiscal year ending June 30              1930           1931           1932              1933              1934


Cost of new work________-__              $31, 987. 77   $34, 240. 19   $92, 640. 04-------                   $7, 395. 30
Cost of maintenance- ---------           251, 271. 87   675, 520. 24   648, 001. 25     $987, 899. 05       398, 386. 94

      Total cost--------      --------   283, 259. 64   709, 760. 43   740, 641. 29     987, 899. 05        405, 782. 24

               ....-__-____
Total expended___     .                  368, 806. 54   637, 357. 76   811,195. 69      966, 791. 30        343, 320. 97

Allotted.       .-------------------     777, 000. 00   479, 000. 00   145, 865. 46   1, 034, 834. 94       460, 055. 94


Balance unexpended July 1, 1933-----------               ___-_-                                     $205, 136. 37
Amount allotted from War Department Appropri-
  ation Act approved Apr. 26, 1934- ________ $270, 000.00
Amount allotted from War Department Appro-
  priation Act approved July 14, 1932 ___________--274, 183. 94
Amount allotted from War Department Appropri-
  ation Act approved Feb. 23, 1931_       -           7, 791. 17
Amount allotted from War Department Appropri-
  ation Act approved Feb. 12, 192511111111           14; 888. 52
                                                                                                        566, 863. 63

     Amount to be accounted for______                                                                   772, 000. 00
Deductions on account of revocation of-
      Allotment________ _---------                                           92, 900. 00
     Impounded balances ------------------------                              13, 907. 69
                                                                                                        106, 807. 69

      Net amount to be accounted for___                                        __                       665, 192. 31
Gross amount expended -------------------------                              924,639. 57
Less:
    Reimbursements collected ------- $579,897. 69
    Receipts from sales____________     1, 420. 91
                                                                            581, 318. 60
                                                                                                        343, 320. 97

        Balance unexpended June 30, 1934________                                 -------                321, 871. 34
   x Includes $11,947.20 plant debit adjustment.
            RIVERS AND HARBORS-JACKSONVILLE,                                      FLA., DISTRICT                   461
Outstanding liabilities June 30, 1934_____________ $70, 034. 89
Amount covered by uncompleted contracts-------      28, 235. 29
                                                                                                           $98, 270. 18
      Balance available June 30, 1934 ___________________                                                  223, 601. 16
Accounts receivable June 30, 1934_ __     ___  ______ __1                                                   37, 925. 78
         Unobligated balance available June 30, 1934_-________                                             261, 526. 94
Amount (estimated) required to be appropriated for completion
   existing project 1                ______                  ______________                                  7, 650. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1936, for maintenance 1--     -----------                                                        325, 000. 00

                                           PUBLIC WORKS FUNDS

Cost of new work to June 30, 1934__---                            _______--------    -290,                     013. 37
Cost of maintenance to June 30, 1934-
         Total cost of permanent work to June 30, 1934________                                             290, 013. 37
Net total expenditures ------------------------------------                                                290, 013. 37
Unexpended balance June 30, 1934 _________________________                                                  11, 860. 59
         Total amount appropriated to June 30, 1934___---                                 -- __            301, 873. 96

         Fiscal year ending June 30                   1930          1931          1932             1933         1934

Cost of new work---------------...........----.....--....__..--......-----------------------------------     $290, 013. 37
                               ------.
Cost of maintenance-----.. -.-------                      ----------             --     - --
Total expended---------------------------                      -------------------------------                290, 013. 37
Allotted-     ---------------------.                                             .----
                                                     ..--------.------------ ------------ ------------        301, 873. 96


Amount allotted from National Industrial Recovery Act ap-
  proved June 16, 1933---------------       ----------                                                    $301, 873. 96
Gross amount expended___----- __----             $294, 998.56
Less reimbursements collected-------------------    4, 985. 19
                                                                                                           290, 013. 37

         Balance unexpended June 30, 1934______                            ______        _____              11, 860. 59

CONSOLIDATED         COST AND FINANCIAL SUMMARY FOR ST. JOHNS RIVER,                                      FLA., JACK-
                                  SONVILLE TO THE OCEAN

Cost of new work to June 30, 1934- ---------------------                                             $7, 477, 600. 27
Cost of maintenance to June 30, 1934 -------------------------                                        7, 760, 774. 83

      Total cost of permanent work to June 30, 1934_.......       15, 238, 375. 10
Value of plant, materials, etc., on hand June 30, 1934_----------     679, 466. 59

      Net total cost to June 30, 1934 __...-------------                                  -          15, 917, 841. 69
Plus accounts receivable June 30, 1934_                                                                   37, 925. 78

      Gross total costs to June 30, 1934 _____------------                                    -      15, 955, 767. 47
Minus accounts payable June 30, 1934_________-------------                                                53, 089. 65

     Net total expenditures ------
                             _---       ---------------                                            - 15, 902, 677. 82
Unexpended balance June 30, 1934 ___ _______-----------                                                  333, 731.93

         Total amount appropriated to June 30, 1934-......                                        . 16, 236, 409. 75

  1 Exclusive of available funds.
  2 Includes $11,947.20 debit plant adjustment.
462          REPORT         OF CHIEF OF                   ENGINEERS, U.             S. ARMIY,          1934


   Fiscal year ending June 30                1930             1931           1932               1933               1934


Cost of new work.........--------------.   $31, 987. 77     $34, 240. 19   $92, 640. 04   --------------...      $297, 408. 67
Cost of maintenance-----.............-     251, 271. 87     675, 520. 24   648, 001. 25     $987, 899. 05         398, 386. 94
      Total cost-..--------------          283, 259. 64     709, 760. 43   740, 641. 29      987, 899. 05         695, 795. 61

Total expended-.---------------            368, 806. 54     637, 357. 76   811, 195. 69       966, 791. 30        633, 334. 34

                               777, 000. 00 479, 000. 00
Allotted......--.............--------------.....                           145, 865. 46    1, 034, 834. 94        761, 929. 90



Balance unexpended July 1, 1933_ ------------------------------                                               $205, 136.37
Amount allotted from War Department Appropria-
tion Act approved Apr. 26, 1934__________________ $270, 000. 00
Amount allotted from War Department Appropria-
tion Act approved July 14, 1932__________________ 274, 183. 94
Amount allotted from War Department Appropria-
tion Act approved Feb. 23, 1931_ ___---------         7, 791. 17
Amount allotted from War Department Appropria-
tion Act approved Feb. 12, 1925_______________       14, 888. 52
Amount allotted from National Industrial Recovery
Act approved June 16, 1933 ----     -------------- 301, 873. 96
                                                                                                              868, 737. 59
      Amount to be accounted for______________________________ 1, 073, 873. 96
Deductions on account of revocation of-
   Allotment ---------------------------------          92, 900. 00
   Impounded balances_--------                 , ------ 13, 907. 69
                                                                 -  106, 807. 69
       Net amount to be accounted for                        _                                                 67, 066. 27
                                                                                                              9____________________
Gross amount expended________________________ 1,219, 638.13
Less :
    Reimbursements collected------- $584, 882. 88
    Receipts from sales      ______ _  1__420. 91
                                       1,
                                                  586, 303. 79
                                                                                                              63 3.334_ 34

      Balance unexpended June 30, 1934______________________                                                  333, 731. 93
Outstanding liabilities June 30, 1934_______________ 70, 034. 89
Amount covered by uncompleted contracts___________ 28, 235. 29
                                                                                                               98, 270. 18
      Balance available June 30, 1934______________________                                                   235, 461. 75
Accounts receivable June 30, 1934_________________________-                                                    37, 925. 78
          Unobligated balance available June 30, 1934___________                                              273, 387. 53

Amount (estimated)               required to be appropriated for completion
  of existing project 1----                           --        ---            --                               7, 650. 00

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1___________________________________                                               325, 000. 00

           3. ST. JOHNS RIVER, FLA., PALATKA TO LAKE I'ARNEY

   Location.-Forlocation of the St. Johns River see page 457.                                                        (See
U. S. Coast and Geodetic Survey Charts Nos. 684, 508, 509, and                                                      458.)
   Previous projects.-Adopted by acts of June 14, 1880, and                                                         July
5, 1884. The cost and expenditures were $55,404.26, of which                                                        $29,-
  1 Exclusive of available funds.
       RIVERS AND HARBORS-JACKSONVILLE,         FLA.,   DISTRICT   463
566.26 was for new work and $25,838 was for maintenance. For
further details see page 1824 of Annual Report for 1915.
   Existing project.-This provides for a channel 8 feet deep at local
mean low water and 100 feet wide from Palatka to Sanford (90
miles) and 5 feet deep at local mean low water and 100 feet wide
from Sanford to Lake Harney (25 miles). This project is an en-
largement and extension of previous projects and embraces two mat-
tress and stone jetties and two lines of guide piles at Volusia bar,
at the head of Lake George, built under previous projects; and
dredging and making cut-offs and easing bends in the river. The
length of the section included in the project is 115 miles, and its
lower end is 83 miles above the entrance to the river. The mean
tidal range is 0.9 foot, and the extr~me tidal range is about 1.7 feet
at Palatka. At low-water stages tidal effect is perceptible in Lake
George, 40 miles above Palatka. Strong northerly and northeasterly
winds raise the water level at Palatka about 1 foot, and strong
southerly and southwesterly winds lower it about the same amount
under ordinary conditions. The flood stages in the river usually
occur during the fall months and are about 2 feet above ordinary
low-water level at Palatka, 3 feet at Lake George, 5 feet at Sanford,
and 6.5 feet 'at Lake Harney.
    The estimate of cost for new work, revised in 1930, is $215,600,
exclusive of amounts expended on previous projects. The latest
 (1920) approved estimate for annual cost of maintenance is $10,000.
   The existing project was adopted by the River and Harbor Act of
June 25, 1910 (H. Doc. No. 1111, 60th Cong., 2d sess.) ; and modified
by the River and Harbor Act of July 3, 1930, to include cut-offs at
Butcher Bend, Snake Creek, and Starks, and easing bends at other
points (H. Doc. No. 691, 69th Cong., 2d sess.). The latest published
maps are in the project documents.
   Local cooperation.-Fully complied with.
    Terminal facilities.-These consist of five general freight and pas-
senger piers having a total frontage of about 500 feet, including a
municipal concrete recreation pier with boat basin adjoining, at
Sanford, and one pier at Palatka having rail connections. The
facilities are adequate for the commerce on the river and are open
to the public.
    Operations and results during fiscal year.-Between July 15 and
October 7, 1933, the leased pipe-line dredge Hercules removed
199,619 cubic yards of soft materials from a number of shoals be-
tween Little Lake George and Sanford. The total advance of the
dredge was 17,100 linear feet. The cost was $16,898.54 for mainte-
nance. From December 21, 1933, to February 17, 1934, the leased
pipe-line dredge Standard was engaged in the relocation of approach
channel to Sanford and in removing shoals in the approach channel
to Benson Springs (Enterprise). The dredge advanced a total of
8,012 linear feet and removed 100,104 cubic yards of material at
a cost of $12,676.48 for maintenance.
   The total cost for the fiscal year was $29,575.02, all for mainte-
nance. The expenditures were $30,691.31.
   Condition at end of fiscal year.-The existing project is about
73 percent completed. The section from Sanford to Lake Harney
     91536-ENG 1934-30
464           REPORT           OF CHIEF OF ENGINEERS, U.                               S.    ARMY,       1934

was completed in the calendar year 1912, but shoaling has occurred
over short distances and the controlling depth of 3 feet at mean
low water is in the reach above Mullet Lake. The section between
Palatka and Sanford was partially completed in June 1923. The
work remaining to be done to complete the project consists in mak-
ing 3 cut-offs and easing a number of bends, as authorized by the
River and Harbor Act of July 3, 1930. The controlling depth for
this section of the improvement is 8 feet for a width of 50 feet.
The total cost and expenditures on the existing project have been
$338,301, of which $152,579.32 was for new work and $185,721.68
was for maintenance.
   Proposed operations.-The balance unexpended on July 1, 1934
 ($40,000), will be applied as follows:
Maintenance :
   Dredging with Government-owned or leased plant, 4 months,
      August-November 1934, removing shoals throughout project as
      required-------------------------------------$26,                                                                    000
   Snagging and removal of overhanging trees with U. S. derrick
      boat D-, or rented United States snagboat throughout the reach
      between Lake George and Lake Harney, 4 months, March-
     June 1935-----------------------------------14,                                                                       000

           Total for all work-------------------                                     ------------------               40, 000
   The additional sum of $63,000 can be profitably expended during
the fiscal year 1936, to be applied to new-work dredging by contract,
September-December 1935, of three cut-offs located at Starks, Snake
Creek, and Butcher Bend.
   No funds can be profitably expended for maintenance during the
fiscal year ending June 30, 1936, as the work contemplated during
1935 is expected to meet the needs of commerce during this period.
                                       Cost and financial summary

Cost of new work to June 30, 1934-                                   ----------------------- $182, 145. 58
Cost of maintenance to June 30, 1934                                       ---------          211, 559. 68
           Total cost of permanent work to June 30, 1934------------                                          393, 705. 26

Net total expenditures-----------------------------------393, 705. 26
Unexpended balance June 30, 1934_                          40, 000. 00

           Total amount appropriated to June 30, 1934--------------                                           433, 705. 26

           Fiscal year ending June 30                    1930            1931            1932          1933            1934

Cost of new work..---------------------------------
Cost of maintenance.........--------------------------- $15, 254. 58                  $25, 618. 02   $1, 123. 93     $29, 575. 02
Total expended...-----------------                    --------         15, 251. 53     25, 621. 07         7. 64      30, 691. 31

Allotted- .......----.......------------------        $15, 000. 00     27, 000. 00   ---------       18, 880. 24      50, 691. 31


Balance unexpended July 1, 1933      --------------------------$20, 000. 00
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934------------------------ $40, 000. 00
Amount allotted from War Department Appropriation
  Act approved July 14, 1932                          11, 068. 74
                                                                                                                   51, 068. 74
Amount to be accounted for______--_--                           -       -__-_-__                          __71, 068. 74
        RIVERS AND       HARBORS-JACKSONVILLE,          FLA.,    DISTRICT        465
Deductions on account of:
   Revocation of allotment____-_______  ___-____                $188. 56
   Revocation of impounded balances------------------            188.87
                                                                             $377. 43
      Net amount to be accounted for  ------------------------ 70, 691. 31
Gross amount expended_____________________________ 30, 794. 10
Less reimbursements collected-----------------          102. 79
                                                                30, 691.31

      Balance unexpended June 30, 1934 _____      ___________---           40, 000. 00

Amount (estimated) required to be appropriated for completion of
existing project 1 _     -----------------------------------              63, 000. 00

Amount that can be profitably expended in fiscal year ending June
30, 1936 for new work 1-0__                                               63, 000. 00

                          4. OKLAWAHA RIVER, FLA.
   Location.-This river has its source in the system of large lakes
in the central part of the peninsula of Florida and flows in a gen-
eral northerly direction, then eastwardly, emptying into the St.
Johns River 22 miles above Palatka. The extreme head of the
system may be taken as Lake Apopka, 120 miles above the mouth
of the river.
   Previous projects.-The first provision for improvement of the
river was made by an act of Congress approved February 24, 1835.
The amount expended prior to the existing project was $3,911.95, all
of which was for new work. For further details see page 1825 of
Annual Report for 1915.
   Existing project.-This provides for deepening the channel to 6
feet at mean low water from the mouth to the head of Silver Springs
Run, a distance of 58 miles; for clearing the channel of obstructions
from Silver Springs Run to Lake Griffin, including the Kyle and
Young Canal and its extension to Morrisons Landing and the J. D.
Young Canal from Morrisons Landing to Starkes Ferry (clear title
to the canals and sufficient land adjacent thereto to provide for future
widening has been conveyed to the United States), with a view to
obtaining a navigable depth of about 4 feet to Leesburg, 87 miles
above the mouth. The work embraces dredging, snagging, cut-offs
at sharp bends, removal of overhanging trees and obstructive aquatic
vegetation, and the construction of a lock and dam at Moss Bluff to
retain the water level in Lake Griffin.
                           Lock and dam at Moss Bluff
Distance to nearest town: 20 miles by canals.
Name of nearest town: Leesburg, Fla.
Distance above mouth of river: 66.3 miles by canals.
Distance above mouth of Silver Springs Run: 13.7 feet.
Width of lock chamber: 30 feet.
Greatest available length for full width: 125 feet.
Lift above low water: 11.5 feet.
Depth on ifpper miter sill at normal pool level: 7 feet.
Depth on lower miter sill at low water: 7 feet.
Character of foundation: Piles in sand and clay.
Character of construction: Concrete with timber gates.
Kind of dam: Movable.
Type of dam: Needle.
Completed in 1925.
Estimated cost: $161,00.
1Exclusive of available funds.
466        REPORT   OF CHIEF OF   ENGINEERS, U.   S. ARMY,   1934

  The river is nontidal except for a short distance above the mouth
at the St. Johns River, where a mean range at low-water stage of
about 0.5 foot is found. The mean fluctuation due to rainfall is
about 2 feet at the mouth, about 3' feet at the mouth of Silver Springs
Run, and about 21/2 feet at Lake Griffin. The extreme fluctuation is
about 3 feet at the mouth, 5 feet at Silver Springs Run, and about
41/2   feet at Lake Griffin.
    The estimated cost of the work proposed, revised in 1929, is
 $351,000, exclusive of amount expended on previous projects. The
latest (1929) approved estimate of cost for annual maintenance is
 $15,000.
   The existing project was adopted by the River and Harbor Act of
September 19, 1890 (Annual Report for 1889, pp. 1360-1368). It
was modified by the River and Harbor Act of March 2, 1907 (H. Doc.
No. 782, 59th Cong., 1st sess.), and was extended by the River and
Harbor Acts of June 25, 1910, and July 25, 1912, to include main-
tenance of the levels of the lakes at the head of the river. By the
River and Harbor Act of July 27, 1916, provision was made for the
acceptance of certain artificial waterways and extensions thereof be-
tween Heather Island (5.6 miles above the mouth of Silver Springs
Run) and Lake Griffin as part of the watercourse in lieu of portions
of the natural bed of the river. The latest published maps will be
found in House Document No. 514, Sixty-third Congress, second
session, and Annual Report for 1891, page 1626.
   Local cooperation.-Underthe provisions of the River and HaI-
bor Act of July 27, 1916, local interests have conveyed, free of cost,
to the United States, in lieu of the original bed of Oklawaha River,
the artificial portions of waterway extending from Heather Island
to Starkes Ferry, a distance of about 15 miles. The right-of-way
varies in width from 100 to 210 feet. To retain the canal waters and
prevent overflow of adjoining lands, local interests constructed a
dike on the right bank, on land now owned by the United States,
from Moss Bluff Dam to Starkes Ferry. Low lying lands on the
left bank of the canal between Moss Bluff and Starkes Ferry are
not protected from overflow. Owners of these lands have given
to the United States releases from liability for damages from over-
flow. Local interests also conveyed to the United States a reser-
vation of about 13 acres at Moss Bluff Lock and Dam. Under
Federal Power Commission license, project no. 177, Florida, the
Oklawaha Power Co. owns and operates a power plant at Moss
Bluff Dam.
   Terminal facilities.-There are numerous landings along this river,
more or less out of repair, privately owned; no charges for wharfage.
One wharf at Leesburg has railway connection. The facilites are
adequate for the small commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project is, about
89 percent completed. By dredging, making cut-offs, and snagging,
a channel has been obtained with a depth of about 5 feet at ordi-
nary stages from St. Johns River to Silver Springs Run, 52.6 miles
above the mouth. Full project width has not been obtained through-
out this section and several sharp bends require easing. The work of
dredging a channel 4 feet deep at low-water stages with a 30-foot
bottom width between Silver Springs Run and the lock at Moss
            RIVERS AND HARBORS-JACKSONVILLE,                                           FLA., DISTRICT                       467
Bluff has been completed. A large portion of the dredging of the
canal from Silver Springs Run to Starkes Ferry has been done by
private interests. The widening and deepening of the canal from
Moss Bluff Lock to Starkes Ferry, to provide for the control of Lake
Griffin, has been completed and the dike on the east side has been
repaired. The waterway is reasonably free from overhanging trees,
snags, and obstructions.   The controlling depths at extreme low
stages are 4 feet from the mouth of the river to Silver Springs
Run, 3 feet from Silver Springs Run to Moss Bluff, 6 feet from
Moss Bluff to Starkes Ferry, and thence 4 feet to Leesburg.     The
total cost and expenditures on the existing project have been $552,-
302. 97, of which $311,352.45 was for new work and $240,950.52 was
for maintenance.
   Proposed operations.-The balance ($5,000)                                             unexpended on July
1, 1934, will be applied as follows:
Maintenance:
   Snagging throughout the project as required, during January-
      February 1935, to be executed by hired labor and U. S. derrick
      boat D-1-------------------------------------------------         $3, 500
   Cutting trees on earth dike between Moss Bluff and Starkes Ferry
      and repairing gullies caused by heavy rains, as required through-
      out the fiscal year 1935, to. be executed by hired labor---------- 1, 500
             Total for all work_------------_                         ------------------------                         5,000
  No funds can be profitably expended for new work or maintenance
during the fiscal year ending June 30, 1936, for the reason that the
completion of the project is not considered essential in view of the
relatively small amount of commerce using the waterway and the
maintenance work contemplated during the fiscal year 1935 is ex-
pected to meet the requirements during this period.
                                          Cost and financial summary
Cost of new work to June 30, 1934----------------------- $315,264. 40
Cost of maintenance to June 30, 1934----------------------- 240, 950. 52
         Total cost of permanent work to June 30, 1934                                                         56, 214. 92
                                                                                                              5----------

Net total expenditures  -----------------------------------  556, 214. 92
Unexpected balance June 30, 1934----------------------------   5, 000. 00

         Total amount appropriated to June 30, 1934-------------                                              561, 214. 92

         Fiscal year ending June 30                     1930           1931            1932           1933            1934


Cost of new work-          -_ -   -                  $74, 929. 07      -- -          $1, 762. 47
Cost of maintenance ..-------------------             11, 431. 57   $22, 637. 80      7, 909. 08   $12, 704. 54       ---

      Total cost   _-------------         ---------. 86, 360. 64     22, 637. 80      9, 671. 55    12, 704. 54
Total expended---------               ------------- 89, 444. 11      27, 156. 60      9, 194. 37    12, 773. 78
Allotted ---_      -----------------------            30, 000. 00    13, 500. 00   ------------     12, 692. 97             $5, 000


Amount allotted from War Department Appropriation                                             Act ap-
  proved Apr. 26, 1934------------------------------------                                                        $5, 000. 00
Balance unexpended June 30, 1934_                                                                                  5, 000. 00
Amount (estimated) required
                   - -
                            to be appropriated for completion of
                         - - - - - - - - - - - -
existing project                                __         ___                                                   39, 600. 00
     Exclusive of available funds.
468         REPORT OF CHIEF OF ENGINEERS, U.                                 S. ARMY,                1934

5. OPERATING AND CARE OF LOCK AND DAM IN OKLAWAHA RIVER
                   AT MOSS BLUFF, FLA.

    The improvement, for which report is made under this caption,.
forms part of the project for improving Oklawaha River, Fla.                                                        See
pages 465 to 467, where general information regarding the improve-
ment can be found. The completed lock and dam has been operated
and maintained under the permanent indefinite appropriation since
August 1, 1929.
   Operations and results during fiscal year.-The lock and dam was
operated and maintained the entire year. The grounds and build-
ings were maintained. There were 158 lockages. The total cost was
$1,887.26 for maintenance.                    The expenditures were $1,795.39.
    Condition at end of fiscal year.-The lock and dam were com-
pleted in 1925 and are in good condition.                                 The United States reser-
vation comprises 13.14 acres, on which have been built a dwelling
and a storehouse, which are in good condition.                                   The total cost from
the permanent indefinite appropriation for operating and care of the
lock and dam to the end of the fiscal year has been $9,415.99.                                                     The
expenditures have been $9,324.12.
   Proposed operations.- The lock and dam will be operated and
maintained under allotments from appropriations made available
for such purposes.
                                     Cost and financial summary

Cost of maintenance to June 30, 1934 ---------------------------- $9, 415. 99,
Minus accounts payable June 30, 1934 ----------------------------      91. 87

     Net total expenditures_______________________-             9, 324. 12
Unexpended balance June 30, 1934 ------------------------------     92. 22

        Total amount appropriated to June 30, 1934----------------9, 416. 34

        Fiscal year ending June 30              1930          1931            1932               1933            1934

Cost of new work    ---------- __
Cost of maintenance-------. ------------      $1, 994. 46   $2, 001. 89     $2, 503. 65        $1, 028. 73     $1,887. 26
Total expended--        _-- ___ _      _
                      -------------------      1, 994. 46    1, 856. 29      2, 649. 25         1, 028. 73       1, 795. 39
Allotted-----------------------------------    2, 000. 00    2, 000. 00      2, 500. 00         1, 787. 73       1, 128.61


Balance unexpended July 1, 1933------------------
                                  __                                                                          $759. 00
Amount allotted from permanent indefinite appropriation,                                       sec. 6,
   River and Harbor Act, Mar. 3, 1909______                                                                  1, 241. 00

        Amount to be accounted for__ _-_-_                                                                   2, 000. 00
Deductions on account of revocation of impounded balances                                  -------              112. 39

      Net amount to be accounted for                                                 --                       , 887. 01
                                                                                                             1---------------
Gross amount expended _____-                                                                                 1, 795. 39

      Balance unexpended June 30, 1934----------------------                                                     92. 22
Outstanding liabilities June 30, 1934                                                                             1. 87
                                                                                                                 9-------------------

     Balance available June 30, 1934----------------------                                                          .35
Amount allotted for fiscal year 1935------------------------------                                           2, 000. 00

        Balance available for fiscal year 1935                       ----                 --                 2, 000. 35
       RIVERS AND HARBORS-JACKSONVILLE,         FLA.,   DISTRICT    469
6. INTRACOASTAL WATERWAY FROM JACKSONVILLE,                FLA.,   TO
                      MIAMI, FLA.

   Location.-The waterway extends from Jacksonville to Miami,
Fla., following the St. Johns River to the mouth of Pablo Creek,
23 miles, and thence following in general the line of a canal con-
structed by the Florida Coast Line Canal & Transportation Co.
 (See U. S. Coast and Geodetic Survey Charts Nos. 3257, 3258, 3259,
and 3260.)
   Previous projects.-Adopted by acts of June 15, 1844, August 18,
1894, February 26, 1896, and July 13, 1892. The cost and expendi-
tures on these projects to June 30, 1927, were $307,997.50, of which
$94,775.25 was for new work and $213,222.25 for maintenance. For
further details see page 1825 of Annual Report for 1915 and page
655 of Annual Report for 1926.
    Existing project.-This provides for an inland waterway in gen-
eral 100 feet wide and 8 feet deep at local mean low water from
Jacksonville to Miami, Fla., a distance of 383 miles, following the
coastal route. From Jacksonville to a point on the St. Johns River
23 miles east, depths in excess of those called for under this project
already exist, and also for a total of about 74 miles between the St.
Johns River and Miami, or about 25 percent of the total length of
the project.
    The mean range of tide is 4 feet at junction with St. Johns River,
2 feet in Indian River in vicinity of the inlets,, and 1.5 feet in
Biscayne Bay. The extreme range at these places is 6 feet, 3 feet,
and 2.4 feet, respectively. Tidal effect is imperceptible at points
along the waterway distant from inlets.
    Strong northeasterly winds raise the water level in St. Johns River
near Pablo Creek about 2 feet. Strong southwesterly winds lower it
about 11/2 feet. Strong northerly winds lower the water level at the
northerly end of Indian River from 1 to 2 feet and raise it at the
southerly end about the same amount. Strong southerly winds have
the opposite effect to a somewhat less extent. Strong easterly winds
raise the water level in Biscayne Bay about 1 foot and strong
westerly winds lower it about 0.5 foot. Winds have a proportionate
effect on other lagoons and lakes, depending on their extent. Strong
northerly winds usually occur during the winter months. Strong
southerly winds prevail during the summer and are not so violent as
the northerly winds. Heavy rainfall raises the water level at the
northerly end of Indian River about 1 foot.
    The estimate of cost for new work revised in 1933, is $6,650,000,
exclusive of amounts expended on previous projects, with $125,000
annually for maintenance.
    The existing project was adopted by the River and Harbor Act
approved January 21, 1927 (H. Doc. No. 586, 69th Cong., 2d sess.),
which provided for a bottom width of 75 feet, and modified by the
River and Harbor Act of July 3, 1930, to provide for a width of 100
feet (S. Doc. No. 71, 71st Cong., 2d sess.). The latest published map
is in the former document.
    Local cooperation.-All conditions of local cooperation have been
complied with except to provide suitable spoil areas for maintenance
dredging. The land required for construction purposes under local
470    REPORT OF CHIEF OF ENGINEERS,        U.   S.   ARMY,   1934


cooperation applies to a total of approximately 124 miles, about one-
third the length of the waterway.
   Terminal facilities.-Extensive terminals with railroad and street
connections are available in connection with the harbors at Jackson-
ville and Miami. Terminals for coastwise vessels have been con-
structed at Fort Pierce (Indian River), Riviera (Lake Worth), and
Port Everglades (Hollywood Harbor), and similar terminals are
contemplated at Port Sewall, near St. Lucie Inlet. The facilities are
adequate for the small commerce now handled, but will probably be-
come inadequate as the existing project nears completion. (For
further details see Port Series No. 8, Corps of Engineers.)
             OPERATIONS AND RESULTS DURING FISCAL YEAR

   Regular funds-Section I, St. Johns River to St. Augustine, 39
miles--Neeo work.-A contract for dredging, to provide the project
dimension waterway from St. Johns River to Tolomato or North
River, 22.9 miles, which was in progress at the beginning of the fiscal
year, was completed on January 20, 1934. Project dimensions with
1 to 2 feet overdepth were secured over 40,090 linear feet of water-
way, involving the removal of 2,511,327 cubic yards of material and
the clearing of 4.5 acres of right-of-way. The cost was $176,257.05.
   Maintenance.-Between January 22 and April 16, 1934, hired
labor and an improvised gasoline engine powered derrick barge
removed 5,468 obstructions from the waterway since the new-work
dredging between St. Johns River and Tolomato River. The cost
of this work was $1,658.57. From July 1 to 3, 1933, U. S. derrick
boat D-1 removed obstructions from 500 linear feet of waterway at
a cost of $68.20. On July 25, 1933, the highway bridge over the
waterway near Palm Valley was formally taken over by the United
States but, due to its dilapidated condition, was removed and a tem-
porary floating bridge constructed by hired labor with the assistance
of U. S. derrick boat D-1. The work was done in the periods Au-
gust 2-9, 1933, and September 8 to October 19, 1933. The temporary
bridge was opened, to traffic on October 14, 1933, and has been oper-
ated by the United States since that date. The total cost incurred
in connection with the operation and removal of the old bridge, the
construction and operation of the temporary bridge, and the design
of a new bridge was $23,410.57.
   Section.II, St. Augustine to Melbourne, 145 miles-New work.-A
contract for dredging a relocation of the channel between New
Smyrna and Mosquito Lagoon (Oak Hill cut-off), in progress at the
beginning of the fiscal year, was completed November 2, 1933. A
channel with project dimensions and 1 to 2 feet overdepth was secured
for a distance of 42,537 linear feet. The material removed amounted
to 1,535,490 cubic yards, and 16.46 acres of right-of-way were cleared.
The cost was $204,243.24 for new work. Approximately 927 tons of
steel-sheet piling for dike construction was purchased at a cost of
$41,663.40, exclusive of freight charges, for new work.
  Maintenance dredging with the U. S. pipe-line dredge Sarasota, in
progress at the beginning of the fiscal year, continued until Septem-
ber 20, 1933. The dredge advanced 18,090 linear feet and removed
105,379 cubic yards of material from Washington, Johnson, Fox,
       RIVERS AND   HARBORS-JACKSONVILLE,       FLA.,   DISTRICT   471
Matanzas relocation and Mellon cuts at a cost of $18,335.95. Main-
tenance dredging with U. S. derrick boat D-1 was in progress from
July 11-29, 1933, and from October 22 to November 14, 1933. A
total of 36,583 cubic yards of material was removed from Fox and
Stucky cuts at a cost of $5,114.99. The advance was 14,775 linear
feet. From July 5-10, 1933, and November 14-16, 1933, this: plant
removed 1,683 obstructions from 82,060 linear feet of waterway at a
cost of $417.38.
   Public Works funds-New work.-Dredging under contract, to
provide for the enlargement of the waterway to project dimensions
from Matanzas Inlet to Halifax River, 24 miles, was begun October
9, 1933, and was in progress at the close of the fiscal year. A channel
with project dimensions and 1 to 2 feet overdepth was secured for a
distance of 97,262 linear feet, involving the removal of 3,440,506
cubic yards of material and the clearing of 140.46 acres of right-of-
way. The cost was $447,406.24 for new work. On June 28, 1934,
bids were invited for the construction of a steel sheet pile dike at
Matanzas Inlet. The cost was $660.79 for new work.
   Regular funds-section III, Melbourne to New) River Inlet, 151
miles-New work.-A contract for dredging the project dimension
waterway throughout Lake Worth, in progress at the beginning of the
fiscal year, was completed on July 17, 1933. The material removed
amounted to 67,772 cubic yards, and a project dimension channel
with 1 to 2 feet overdepth was secured for a distance of 2,000 linear
feet. The cost was $18,335.11 for new work. Dredging under con-
tract for the enlargement of the waterway between the Palm Beach-
Broward County line and New River Inlet, in progress at the begin-
ning of the fiscal year, was completed on May 28, 1934. The project
dimension waterway with 1 to 2 feet overdepth was completed for a
distance of 64,346 linear feet, involving the removal of 3,108,512
cubic yards of material and the clearing of 133.43 acres of right-of-
way. The cost was $448,558.22 for new work. Under authority of
section 3 of the River and Harbor Act approved July 3, 1930, an
allotment of $1,000 was made for the removal of shoals in Manatee
Creek, near Salerno. No work had been accomplished at the close
of the fiscal year.
   The U. S. pipe-line dredge Sarasota was engaged in maintenance
dredging from November 1, 1933, to March 10, 1934, and removed
a number of shoals located between St. Lucie Inlet and Deerfield.
The advance of the dredge was 22,091 linear feet, and the cost was
$29,293.32. The U. S. pipe-line dredge Congaree removed 3,311
cubic yards of material from a shoal 500 feet long near the Fort
Pierce Bridge at a cost of $1,252.25 for maintenance. From January
4 to 10, 1934, the U. S. derrick boat D-1 removed 66 obstructions
from the waterway in the vicinity of Riviera and West Palm Beach
at a cost of $16.37 for maintenance.
   Public Works funds.-Dredging under contract, to provide for
the enlargement of the waterway to project dimensions from Great
Pocket to Lake Worth, 24 miles, was begun on October 6, 1933, and
was in progress at the close of the fiscal year. There were removed
3,075,908 cubic yards of material, involving the clearing of 176.48
acres of right-of- way. A project dimension waterway with 1 to 2
feet overdepth was secured for a distance of 76,150 linear feet. The
472    REPORT OF   CHIEF OF ENGINEERS, U.      S.   ARMY,   1934

cost was $456,045.89. The enlargement of the waterway to project
dimensions from the south end of Lake Worth to the Broward-Palm
Beach County line, 15 miles, was begun under contract on October 2,
1933, and was in progress at the close of the fiscal year. There were
removed 2,108,461 cubic yards of material, involving the clearing of
183.73 acres of right-of-way. A project dimension channel with 1
to 2 feet overdepth was completed for a distance of 45,400 linear
feet. The cost was $475,947.07.
   Regular funds-Section IV, New River Inlet to Miami, 25 miles.-
A continuing contract to provide project dimensions throughout the
section by dredging, which was in progress at the beginning of the
fiscal year, was completed on May 28, 1934. There were removed
1,760,097 cubic yards of material. The project dimension waterway
with 1 to 2 feet overdepth was secured for a distance of 68,584 linear
feet. The cost was $490,675.12 for new work.
   From January 15, 1934, to March 5, 1934, the U. S. derrick boat
D-1 was engaged in the removal of wrecks, snags, logs, and other
menaces to navigation in Dumbfoundling Bay and in the vicinity of
Fulford Bridge. A total of 31,845 obstructions was removed at a
cost of $7,898.38 for maintenance.
   Summary.-With regular funds the following work was accom-
plished: Under contracts for dredging, 41.2 miles of waterway were
completed to project dimensions with 1 to 2 feet overdepth, involving
the removal of 8,983,198 cubic yards of material and the clearing
of 154.39 acres of right-of-way at a total cost of $1,338,068.74 for
new work. An aggregate distance of 55,456 linear feet was covered
in maintenance dredging operations with United States plant and
hired labor, and a total of 313,232 cubic yards of material was re-
moved at a cost of $53,996.51. A total of 39,337 obstructions to
navigation was removed from about 27 miles of the waterway with
United States plant and hired labor at a total cost of $10,058.90 for
maintenance. The dilapidated highway bridge over the waterway
near Palm Valley was removed and replaced with a temporary float-
ing bridge which has been operated by the United States since its
completion. Precontract surveys, and surveys and inspections inci-
dental to the supervision of the waterway were made, as required,
at a cost of $7,652.36 for new work and $31,971.31 for maintenance,
a total of $39,623.67.
   With Public Works funds, the following work was accomplished:
Under contracts for dredging to provide for the enlargement of
the waterway in accordance with the provisions of the existing proj-
ect, 41.4 miles of waterway were completed to project dimensions
with 1 to 2 feet overdepth, involving the removal of 8,624,875 cubic
yards of material and the clearing of 500.67 acres of right-of-way
at a cost of $1,379,399.20.
   Under regular funds, the cost was $1,388,762.94 for new work
and $119,482.13 for maintenance, a total of $1,508,245.07; the ex-
penditures were $1,656,373.40. Under Public Works funds, the cost
was $1,380,059.99 for new work and the expenditures $1,218,839.42.
The grand total cost under all funds was $2,888,305.06, of which
 $2,768,822.93 was for new work and $119,482.13 was for maintenance.
The total expenditures were $2,875,212.82.
       RIVERS    AND HARBORS-JACKSONVILLE,             FLA., DISTRICT       473
   Condition at end of fiscal year.-The existing project is about 96
percent completed, of which about 21 percent represents work done
with Public Works funds. The entire waterway has been cleared of
logs, snags, overhanging trees, and boulders. The condition of the
project with reference to dredging accomplished is itemized by sec-
tions as follows: Section I, 22.9 miles, representing all dredging re-
quired, have been dredged to project dimensions with regular funds;
section II, 75.7 miles, have been dredged to project dimensions with
regular funds, 18.4 miles have been completed with Public Works
funds, and 5.6 miles remain to be dredged, under an existing contract,
with Public Works funds; section III, 104.1 miles, have been dredged
to project dimensions with regular funds, 23 miles with Public Works
funds, and 16 miles remain to be dredged under existing contracts
with Public Works funds; section IV, 24.5 miles, representing all
dredging required, have been dredged to project dimensions with
regular funds. The work remaining to be done to complete the
project is the completion of dredging, involving 21.6 miles of water-
way, under existing contracts with Public Works funds, and the con-
struction, of a dike at Matanzas Inlet to restrict the tidal flow from
the inlet into the southerly end of the bypass channel dredged at
that point. Project dimensions now exist over approximately, 3611/
miles, or 94.5 percent, of the waterway except for spot shoals which
have formed at a number of localities. The controlling depths are
as follows: Section I, St. Johns River to St. Augustine, 8 feet; sec-
tion II, St. Augustine to Melbourne, 5 feet; section III, Melbourne to
New River Inlet, 5 feet; section IV, New River Inlet to Miami, 9
feet.
   Under regular funds, the cost of the existing project has been
$5,038,229.26 for new work and $313,523.09 for maintenance, a total
of $5,351,752.35; the expenditures have been $5,732,214.78. Under
Public Works funds, the cost has been $1,380,059.99 and the expendi-
tures $1,218,839.42, all for new work. The grand total cost of the
existing project under all funds has been $6,731,812.34, of which
$6,418,289.25 was for new work and $313,523.09 was for maintenance;
the total expenditures have been $6,951,054.20.
   Proposed operations.-The balance unexpended and accounts re-
ceivable on July 1, 1934 ($183,290.46), will be applied as follows:
Accounts payable June 30, 1934--------------------------------       $14, 035. 55
Maintenance :
    Dredging with U. S. dredge Congaree, 5 months,
      July-December 1934, removing shoals through-
      out the project as required----_                _ $52, 500. 00
    Dredging with U. S. dredge Sarasota, 4 months,
      August-November 1934, removing shoals through-
      out the project as required-------------------- 30, 000. 00
    Miscellaneous snagging and obstruction removal
      with U. S. derrick boat D-1, 2 months, Septem-
      ber-October 1934------------------------ __         6, 400. 00
    Plant construction and betterments-..............    80, 354. 91
                                                                     169, 254. 91

      Total for all work--------------------------------------        183, 290. 46
  The balance unexpended July 1, 1934, from the allotment made
during September 1933, from the National Industrial Recovery Act
($781,160.58), will be applied as follows:
474         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                   1934

                                                                     $161,220. 57
Accounts payable June 30, 1934_______________________________-------------
New work:
    Complete during October 1934, under contract, the
      enlargement to project dimensions of the 24-
      mile reach of the waterway from Matanzas
      Inlet to Halifax River-------------------- $207, 300.00
    Complete during November 1934, under contract,
      the enlargement to project dimensions of the
      23-mile reach of the waterway extending from
      the south end of Great Pocket to Lake Worth_      81, 040. 01
    Complete during November 1934, under contract,
      the enlargement to project dimensions of the
      15-mile reach of the waterway extending from
     Lake Worth to the Palm Beach-Broward County
      line    ----------------------------------      306, 600. 00
    Construct by contract, during period August-
     September 1934, approximately 2,200 linear feet
     of protection bulkhead at the south end of
     Matanzas relocation channel, using steel sheet
     piling bought with regular funds_________ ___      25, 000. 00
                                                                      619, 940. 01
        Total for all work----_--__----------------                                   ----------- 781, 160. 58
  The additional sum of $165,000 can be profitably expended during
the fiscal year 1936 as follows:
Maintenance :
   Dredging with U. S. dredge Congaree, 10 months, July 1935-April
     1936, removing shoals throughout the project as required____ $110, 000
   Dredging with U. S. dredge Sarasota, 5 months, February-June
     1936, removing shoals throughout the project as required__.    45, 000
   Miscellaneous snagging operations with U. S. derrick boat D-1,
     3 months, January-March 1936_  ---------- __--------------     10, 000

        Total for all work---_
                             _--_--------- ----------------------                                                165, 000
                                      Cost and finanoial summary
                                MAINTENANC E AND, IMPROVEMENT FUNDS

Cost of new work to June 30, 1934_________________-----------                                           $5, 133, 004. 51
Cost of maintenance to June 30, 1934 1_________-_------                                                     526, 745. 34

      Total cost of permanent work to June 30, 1934 _____----                                       _    5, 659, 749. 85
Value of plant, materials, etc., on hand June 30, 1934                            -----------               385, 134. 23

      Net total cost to June 30, 1934___________________   _                                             6, 044, 884. 08
Plus accounts receivable June 30, 1934__________- ________-_                                                  9, 363. 75
      Gross total costs to June 30, 1934                                                                  , 054, 247. 83
                                                                                                         6________-___________6
Minus accounts payable June 30, 1934________________________                                                 14, 035. 55
     Net total expenditures_____                                                                          , 040, 212. 28
                                                                                                         6______________________
Unexpended balance June 30, 1934_________________________                                                   173, 926. 71
        Total amount appropriated to June 30, 1934____________                                          6, 214, 138. 99

   Fiscal year ending June 30                   1930           1931            1932              1933              1934

Cost of new work.. .                     $128, 930. 86 $1, 347, 784. 59     $588, 505.61 $1,574,181.02        $1, 388, 762. 94
Cost of maintenance--- -----          ..............                          89, 134. 62   104, 313. 71          119, 482.13
     Total cost...----------.              128, 930. 86   1, 347, 784. 59    677, 640. 23   1,678,494.73 1, 508, 245. 07
Total expended----_-                       113, 235. 01   1, 743, 527. 58    795, 004. 32   1, 411, 749. 62    1, 656, 373. 40
Allotted. _- - - - - - -         --        960, 000. 00   1, 595, 210. 37    267, 000. 00   2, 477, 152. 96      589, 263. 62

  1Includes $856.28 credit plant adjustment.
            RIVERS AND HARBORS-JACKSONVILLE,                                      FLA., DISTRICT                475
Balance unexpended July 1, 1933_ --_-_-_______-_- __-___--                                         $1, 241, 036. 49
Amount allotted from War Department Appropria-
  tion Act approved Apr. 26, 1934--------------- $120, 000.                                 00
Amount allotted from War Department Appropria-
  tion Act approved July 14, 1932_________________ _ 291, 855.                              67
Amount allotted from Emergency Relief and Con-
  struction Act approved July 21, 1932     -         135, 736.                              12
Amount allotted from War Department Appropria-
  tion Act approved Mar. 4, 1933__                    53, 000.                              00
                                                                                                       600, 591. 79

Amount to be accounted for__________________________________                                        1, 841, 628.28
Deductions on account of revocation of-
    Impounded funds_______             __------
                                           ---------- $10, 328. 17
   Allotment --------------------------------           1, 000. 00
                                                                                                        11, 328. 17

      Net amount to be accounted for________________--___                                           1, 830, 300. 11
Gross amount expended                          $1, 769, 477.65
Less reimbursements collected_ -_______-----
                                         -113,          104. 25
                                                                                                    1, 656, 373. 40

      Balance unexpended June 30, 1934___________________--                                            173, 926. 71
Outstanding liabilities June 30, 1934------------   50, 036. 97
Amount covered by uncompleted contracts-------       1, 080. 32
                                                                                                        51, 117. 29

      Balance available June 30, 1934__                                                 __              22, 809. 42
                                                                                                       1________
Accounts receivable June 30, 1934_-------------                             -       ---------            9, 363. 75
          Unobligated balance available June 30, 1934__________ __                                     132, 173. 17

Amount that can be profitably expended in- - fiscal year ending
                                 -- ------ --
June 30, 1936, for maintenance 1     _______                                                          165, 000. 00
                                           PUBLIC WORKS FUNDS

Cost of new work to June 30, 1934 ________--
                                         -   -                                  -____       __ $1, 380, 059. 99
Cost of maintenance to June 30, 1934___________                                     ___            --------
     Total cost of permanent work to June 30, 1934-- __--__-                                        1, 380, 059. 99
Minus accounts payable June 30, 1934_________________-------                                           161, 220. 57
      Net total expenditures__                                                                        218, 839. 42
                                                                                                    1__________--_______1,
Unexpended balance June 30, 1934_                                                                     781, 160. 58
         Total amount appropriated to June 30, 1934 .------------                                   2, 000, 000.00

    Fiscal year ending June 30             1930            1931            1932             1933              1934
         Costworf ne
Cost of new work -             -............. ---------------------------------------. -------------- $1, 380, 059. 99
Cost of maintenance-........---
Total expended..--------..........---                 ----         ---
                                                                  ----   ---                             1,218,839.42
Allotted..--------     ---     .------                                                                   2, 000, 000.00

   SExclusive      of available funds.
476         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                     1934

Amount allotted from National Industrial Recovery Act approved
  June 16, 1933-------------------------------------                $2, 000, 000. 00
Gross amount expended---------                       $1,218, 920.93
Less reimbursements collected-81.                                51
                                                                     1, 218, 839. 42
     Balance unexpended June 30, 1934 ---------------------  781, 160. 58
Amount covered by uncompleted contracts--------------------712, 142. 61
         Balance available June 30, 1934_
                                        ------------------------                                                 69, 017.97

CONSOLIDATED COST AND FINANCIAL                          SUMMARY FOR WATERWAY,                      JACKSONVILLE             TO
                                                          MIAMI

Cost of new work to June 30, 1934------------------------$6, 513,064. 50
Cost of maintenance to June 30, 1934 1------        ---      526, 745. 34

      Total cost of permanent work to June 30, 1934-----------7, 039, 809. 84
Value of plant, materials, etc., on hand June 30, 1934---------- 385, 134. 23

      Net total cost to June 30, 1934_-----------------------7, 424, 944.07
Plus accounts receivable June 30, 1934------------------------    9, 363. 75

     Gross total costs to June 30, 1934 ----------------------- 7, 434, 307. 82
Minus accounts payable June 30, 1934---------------------          175, 256. 12

     Net total expenditures  ----------------------------                                                  7, 259, 051. 70
Unexpended balance June 30, 1934 _-------                                             -----                   955, 087. 29

         Total amount appropriated to June 30, 1934-----------                                             8,214, 138. 99

   Fiscal year ending June 30              1930                 1931            1932               1933              1934


Cost of new work-                     $128, 930.86 $1, 347, 784. 59
                         -......--------                                     $588, 505. 61 $1, 574, 181. 02      $2, 768, 822. 93
Cost of maintenance- ..........       ....... . .       ... .          ...     89, 134. 62     104, 313. 71          119,482.13

      Total cost_------------            128, 930. 86      1, 347, 784. 59    677, 640. 23    1, 678, 494. 73     2, 888, 305. 06

Total expended_ -..-----------           113, 235. 01     1, 743, 527. 58     795, 004. 32    1, 411, 749. 62    2, 875, 212. 82

Allotted---.-----     ----- -------     960, 000. 00      1,595, 210. 37      267, 000. 00    2, 477,152. 96     2, 589, 263. 62



Balance unexpended July 1, 1933 --               _____---------- $1,241,036. 49
Amount allotted from War Department Appropri-
ation Act approved Apr. 26, 1934 ------------    $120, 000. 00
Amount allotted from War Department Appropri-
  ation Act approved July 14, 1932             -   291, 855. 67
Amount allotted from Emergency Relief and Con-
struction Act approved July 21, 1932 -      -     135, 736. 12
Amount allotted from War Department Appropria-
  tion Act approved Mar. 4, 1933--------------       53, 000. 00
Amount allotted from National Industrial Re-
  covery Act approved June 16, 1933----------2,000,000.00
                                                                  2, 600, 591. 79

      Amount to be accounted for------------------------3,                                                      841,628. 28
Deductions on account of revocation of-
   Impounded funds-------------------------      10, 328. 17
    Allotment ----                      --------      000. 00
                                                 1,1------------
                                                                                                                 11, 328. 17

         Net amount to be accounted for                          ----------------------                   3, 830, 300. 11

  1Includes $856.28 credit plant adjustment.
        RIVERS AND HIARBORS-JACKSONVILLE,                  FLA.,   DISTRICT          477

Gross amount expended _____________________            $2, 988, 398. 58
Less reimbursements collected-_--                          113, 185. 76
                                                                          $2, 875, 212. 82
      Balance unexpended June 30, 1934- --- ___            -________--       955, 087. 29
Outstanding liabilities June 30, 1934                      50, 036. 97
Amount covered by uncompleted contracts--------           713, 222. 93
                                                                             763, 259.90
     Balance available June 30, 1934_.............                           191, 827. 39
Accounts receivable June 30, 1934-----___------------..                        9,363. 75

      Unobligated balance available June 30, 1934 ----------                 201, 191. 14
Amount that can be profitably expended in fiscal year ending
June 30, 1936, for maintenance 1 - - - - - - - - - - - - -- - -- -
                                                                             165, 000. 00

                          7. FORT PIERCE HARBOR, FLA.

   Location.-Located on the east coast of Florida, about 213 miles
south of the entrance to St. Johns River and about 124 miles north
of the entrance to Miami Harbor. (See U. S. Coast and Geodetic
Survey Charts Nos. 1247 and 3259.)
   Existing project.-The Deficiency Act of March 4, 1931, carries an
item for dredging at Fort Pierce Harbor, Fla., as follows:
  Fort Pierce Harbor:          For dredging the channel of Fort Pierce Harbor,
Florida, fiscal years 1931     and 1932, $20,000: Provided, That no part of this sum
shall be expended until        local interests shall have agreed to maintain such
channel upon completion        of the dredging herein provided for.
   The project developed by private interests provided a depth of
22 feet at mean low water in the channel through the inlet and across
Indian River to the turning basin at Fort Pierce terminal. The
channel at the entrance was dredged 240 feet wide for a distance of
about 3,300 feet, through the inlet 180 feet wide for a distance of
about 3,000 feet, across Indian River 100 feet wide to the turning
basin, a distance of about 7,800 feet, and the turning basin 775 feet
across and; 900 feet long. The entrance is protected by parallel
stone jetties with revetment extensions at their inner ends 900 feet
apart, the north jetty and revetment being about 3,500 feet long
and the south jetty and revetment about 3,200 feet long. The mean
range of tide at the entrance is about 2.6 feet and 0.7 foot at the
terminal, with northeast storm tides as high as 5 feet above mean
low water. The latest published map of Fort Pierce Inlet, Fla.,
is printed in House Document No. 252, Seventy-second Congress,
first session.
   Supplementing the work authorized by Congress, the maintenance
of channels 22 and 25 feet deep and the repair of jetties at the en-
trance, as recommended by the Chief of Engineers in House Docu-
ment No. 252, Seventy-second Congress, first session, has been
included in the Public Works program under the National Industrial
Recovery Act.
   Recommended modifications of project.-Under date of February
15, 1932, the Chief of Engineers recommended the improvement of
Fort Pierce Harbor so as to provide for the maintenance of a channel
240 feet wide and 25 feet deep from deep water in the ocean to the
shore line, thence 180 feet wide and 22 feet deep for a distance of 3,000
  1 Exclusive   of available funds.
478    REPORT OF CHIEF OF ENGINEERS,         U.   S.   ARMY,   1934


feet through the inlet and into Indian River, thence 100 feet wide and
22 feet. deep to a turning basin 900 feet long, 775 feet wide, and 22
feet deep at the western shore of Indian River, and the maintenance
of the jetties at the ocean end of the inlet and shore revetments within
the inlet in prolongation of the jetties, including such minor changes
in channel alinement and dimensions and minor auxiliary works as
may be desirable to reduce maintenance costs, all at an estimated cost
of $250,000 for initial restoration with maintenance at the rate of
$50,000 per year for a period of 4 years and $30,000 a year there-
after, subject to certain conditions of local cooperation (H. Doc. No.
252, 72d Cong., 1st sess.). Authorized under Public Works program.
   Local cooperation.-The work authorized under the Public Works
program is subject to the provisions that local interests convey to the
United States, free of cost, all existing works included in said proj-
ect and a strip of land at least 50 feet wide on each side of and along
and bordering the waterway through the inlet entirely across the
barrier land strip between the Atlantic Ocean and the Indian River,
and shall provide suitable areas as may be necessary for disposal of
dredged material during initial restoration and future maintenance
as and when needed. All prior requirements have been fully com-
plied with.
   Terminal facilities.-These consist of two earth-filled piers in steel-
sheet piling with berthing space of about 1,500 feet. Transit sheds
70 by 200 feet and 50 by 150 feet are located on the piers, one being
served by railway and both by highway connections. The facilities
are adequate for existing commerce.
             OPERATIONS AND RESULTS DURING FISCAL YEAR

   Regular funds.-Maintenance dredging to restore project dimen-
sions with U. S. hopper dredge Comstock was completed on July 1,
1933. There were removed from the channel across Indian River
and from Bar Cut a total of 2,460 cubic yards, all bin measurement.
The cost was $873.44. Mainltenance dredging to restore project di-
mensions in the turning basin and in the ship channel across Indian
River was in progress with U. S. pipe-line dredge Congaree from
March 4 to 10 and 14 to 15, 1934, and from May 20 to June 30, 1934.
The work was still in progress at the close of the fiscal year. There
were removed from the turning basin and from the ship channel a
total of 123,888 cubic yards. The advance of the dredge was 5,765
linear feet, and the cost was $17,923.95, all from regular funds.
   Public Works funds.-The repair, under contract, of the north and
south jetties was begun on October 17, 1933, and was in progress at
the close of the fiscal year. The work was seriously delayed because
of unfavorable weather conditions. There were removed from above
high-water line and reset on the new jetty lines, 1 foot below mean
low water, 5,063.28 cubic yards of old coquina rock in 1,580 linear
feet of the north jetty and 813.49 cubic yards in 180 linear feet of
the south jetty, a total of 5,876.77 cubic yards. There were placed
       RIVERS AND HARBORS-JACKSONVILLE,                   FLA.,    DISTRICT          479

in the jetties, 26,423.1 tons of new stone, granite ranging in weight
from 4 to 10 tons. Of this total 22,716.55 tons were placed in 2,180
linear feet of north jetty and 3,706.55 tons in 690 linear feet of south
jetty. The cost was $154,821.36 for maintenance. Periodic surveys
to determine the condition of the entrance channel were made at a
cost of $2,081.05 for maintenance.
    Under regular funds the total cost for the fiscal year was $18,-
797.39, all for maintenance, and the expenditures $24,351.63. Under
Public Works Administration funds the total cost was $156,902.41
for maintenance; the expenditures were $111,157.57. The grand
total cost under all funds during the fiscal year was $175,699.80, all
for maintenance; the expenditures were $135,509.20.
    Condition at end of fiseal year.-The repair of the jetties at the
entrance with Public Works Administration funds is about 62 per-
cent completed. The controlling depths are as follows: Bar Cut,
23.1 feet; channel through the inlet, 22.5 feet; channel across Indian
River to the turning basin, 20 feet; and 22 feet in the turning basin
adjacent to the terminal slips.
    Under regular funds the total cost has been $52,910.32 for mainte-
nance, and the expenditures $49,257.48. Under Public Works funds
the total cost has been $156,902.41 for maintenance and the expendi-
  tures $111,167.57. The grand total cost has been $209,812.73 for
maintenance, and the total expenditures have been $160,415.05.
    Proplosed operations.-The balance unexpended on July 1, 1934
  ($50,986.68), will be applied as follows:
Accounts payable June 30, 1934_-___---               ____-___-___-$4, 080.00
Maintenance:
    Dredging with U. S. dredges Absecon or Congree
      throughout the project as required during the
      fiscal year 1935 ---       -       -______---____-$26, 906. 68
    Repair of the north jetty by hired labor, January-
      March 1935-------------      -------            _  20,000. 00
                                                                     46, 906. 68

       Total for all work ________          _____________ -             _       50, 986.68
  The balance unexpended on July 1, 1934, from the allotment from
the National Industrial Recovery Act ($138,842.43), will be applied
as follows:
Accounts payable June 30, 1934 -----------------           -   $45, 744.84
Maintenance: Completion during August 1934 of contract for the
  repair of the jetties at the entrance____________________--__  93, 097. 59

       Total for all work _____________-_______                   ___       __-138, 842. 43
   The additional sum of $50,000 can be profitably expended during
the fiscal year 1936 as follows:
Maintenance :
    Dredging with U. S. hopper dredge Absecon in Bar Cut and in
       channel between the jetties, 1 month, November 1935_--------- $14, 000
     Dredging by contract or by Government plant and hired labor in
       channel across the Indian River and turning basin, January-
       March 1936---------        --------------------------------    36, 000

       Total for all work_____----__-------------------                             50, 000
      91536-ENG 1934-31
480          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY                                                          1934

                                              Cost and financial summary
                                 MAINTENANCE              AND          IMPROVEMENT           FUNDS


Cost of new work to June 30, 1934________-------------------     --
Cost of maintenance to June 30, 1934_______________-------------    $52, 910. 32
Value of plant, materials, etc., on hand June 30, 1934------------      - 22. 84

                                             -----------
      Net total cost to June 30, 1934______________--                                                                     52, 887.48
Plus accounts receivable June 30, 1934_____________ ___---------                                                              450. 00

     Gross total costs to June 30, 1934___ ______________-----53, 337. 48
Minus accounts payable June 30, 1934__                          4, 080.00

         Net total expenditures ----------                                                                                49, 257. 48
Unexpended balance June 30, 1934________________-------                                                 _                 50, 536. 68

            Total amount appropriated to June 30, 1934---------------                                                     99, 794. 16

         Fiscal year ending June 30                             1930              1931          1932          1933             1934


Cost of new work.  -------------------------------------------------------------                                                      --
Cost of maintenance---------------------------   $20, 000. 00 ------------ $14, 112. 93                                     $18, 797. 39

Total expended_------------------                         ----                19, 973. 08        $26.92.    4,905.5          24, 351. 63
Allotted-          ----------   -------          ------------          ------ 20, 000.00    ---- -          29, 994. 16      49, 800. 00


Balance unexpended July1, 1933_______________________________                                                         $25, 088.31
Amount allotted from War Department Appropriation Act ap-
  proved Apr. 26, 1934 ___________---___-------------__                                                                   50, 000.00

    Amount to be accounted for __________________________                                                                 75, 088.31
Deductions on account of revocation of impounded funds .......                                                                200. 00

      Net amount to be accounted for ____--____-__        ---                                                             74,888.31
Gross amount expended ______                      $25,639. 89
Less reimbursements collected _---______-__------   1, 288.26
                                                                                                                          24, 351. 63

       Balance unexpended June 30, 1934------------------_                                                                50, 536.68
Outstanding liabilities June 30, 1934________________________                                                             4, 080. 00

       Balance available June 30, 1934 --     -----                                                                       4 46,456. 68
Accounts receivable June 30, 1934_______________                                            ___________                      450. 00

            Unobligated balance available June 30, 1934_                                                                  46, 906.68
                                                    PUBLIC WORKS FUNDS

Cost of new work to June 30, 1934_        _________
Cost of maintenance to June 30, 1934_.__._______    __________                                                       $156, 902.41
      Net total cost to June 30, 1934____________________________                                                      156, 902.41
Minus accounts payable June 30, 1934 ___________.______________                                                        45, 744. 84
      Net total expenditures________________________              111, 157. 57
Unexpended balance June 30, 1934___     -                        138, 842. 43
                                                -_____________________
            Total amount appropriated to June 30, 1934---------------                                                     250, 000.00

            Fiscal year ending June 30                           1930              1931          1932          1933             1934


Cost of new work------.........--------------------------------
Cost of maintenance-------------------------------------                                   . ..----        --------- $156, 902. 41
Total expended-..-. --...-......................                       .   ...                                              111, 157. 57

Allotted-------                -         -                          _          _
                                              -----------------------------------------................-                    - 250, 000. 00
           RIVERS AND HARBORS-JACKSONVILLE,                                                 FLA., DISTRICT                      481
Amount allotted from National Industrial Recovery Act approved
June 16, 1933      ------------------------------------       $2501, 000. 00
Gross amount expended --     -------------------------------     111, 157. 57

      Balance unexpended June 30, 1934__      __________--------                                                      138, 842. 43
Outstanding liabilities June 30, 1934 ________     ___                                                 $46. 04
Amount covered by uncompleted contracts -108,                                                          888. 76
                                                                                                                      108, 934. 80

         Balance available June 30, 1934                                                                                  29, 907. 63

Amount that can be profitably expended in fiscal year ending June
   30, 1936, for maintenance 1-____________                                                                               50, 000. 00
  CONSOLIDATED           COST       AND FINANCIAL        SUMMARY          FOR         FORT PIERCE               HARBOR,       FLA.

Cost of new work to June 30, 1934__----    __________--__________
Cost of maintenance to June 30, 1934________________----         $209, 812.73
Value of plant, materials, etc., on hand June 30, 1934______ - -      -- 22. 84

      Net total cost to June 30, 1934_.----                                                                           209, 789. 89
Plus accounts receivable June 30, 1934__                           -              -                                        450. 00

         Gross total costs to June 30, 1934-----__                                                                    210, 239. 89
Minus accounts payable June 30, 1934___________________________                                                           49, 824. 84

     Net total expenditures-_________--____                                                                           160, 415. 05
Unexpended balance June 30, 1934_____________________                                                      __         189, 379. 11

         Total amount appropriated to June 30, 1934 _________ -__                                                     349, 794. 16

         Fiscal year ending June 30                    1930            1931                 1932              1933            1934


Cost of new work------------------------
Cost of maintenance-                                              $20, 000. 00 ---                         $14, 112. 93    $175, 699. 80
Total expended__                -                       --         19, 973. 08               $26. 92         4, 905. 85     135, 509. 20
Allotted. --      ----------------------------------               20, 000. 00         -               _    29, 994. 16     299, 800. 00


Balance unexpended July 1, 1933 __ _______
                                        --        ______________ $25, 088. 31
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934______________________ $50, 000. 00
Amount allotted from National Industrial Recovery Act
  approved June 16, 1933--------      __-__________   250, 000. 00
                                                                   300, 000. 00

     Amount to be accounted for____________________________                                                           325, 088. 31
Deductions on account of revocation of impounded balances .---.                                                            200. 00

      Net amount to be accounted for-...     ___-_________-__- 324, 888.31
Gross amount expended_______ ____ -      -______ -    $136, 797.46
Less reimbursements collected_____-_____        ____     1, 288. 26
                                                                       135, 509. 20
      Balance unexpended June 30, 1934 _______-       -__-______189, 379. 11
Outstanding liabilities June 30, 1934                      , 126. 04
                                                         4--------------
Amount covered by uncompleted contracts ----------- 108, 888. 76
                                                                       113, 014. 80
      Balance available June 30, 1934_______________________             76, 364. 31
Accounts receivable June 30, 1934__        _     -   -_____________-----     450. 00
         Unobligated balance available June 30, 1934________________                                                      76, 814. 31
Amount that can be profitably expended in fiscal year ending June
   30, 1936, for maintenance 1--                              -               -         -                                 50, 000. 00
   1Exclusive of available funds.
482    REPORT OF    CHIEF OF ENGINEERS,      U.   S. ARMY,   1934

                    8. LAKE WORTH INLET, FLA.

   Location.-Located on the east coast of Florida, about 71 miles
north of the entrance to Miami Harbor, and is the entrance channel
to the Port of Palm Beach. (See U. S. Coast and Geodetic Survey
Charts Nos. 1248 and 3260.)
   Ecisting project.-No project has been authorized by Congress.
The completion and maintenance (as constructed by local interests)
of a channel 16 feet deep at mean low water, 300 feet wide from deep
water in the ocean to the western end of the inlet (about 2,400 feet),
thence 150 feet wide across Lake Worth (about 4,300 feet) to and
including a turning basin 700 feet square on the western shore of
Lake Worth, and maintaining the two parallel stone jetties hereto-
fore constructed at the entrance, 800 feet apart and about 1,650 feet
long, all at an estimated cost of $30,000 with maintenance estimated
at $20,000 annually, as recommended by the Chief of Engineers on
December 6, 1933 (H. Doc. No. 185, 73d Cong., 2d sess.), was au-
thorized by the Federal Emergency Administration of Public Works.
The mean range of tide at the inlet is 2.6 feet and 1.8 feet at the Port
of Palm Beach terminals. The latest published map is in the above-
named document.
   Local cooperation.-The work included in the Public Works pro-
gram is subject to the condition that local interests furnish suitable
spoil disposal areas and convey to the United States, free of cost,
title to the jetties and easements over strips of land adjacent to the
channel through the inlet, which lie channelward of due east and
west lines passing approximately 100 feet landward of the shore ends
of the jetties. These conditions have not been fully complied with.
   Terminal facilities.-These consist of a slip 600 feet long and 200
feet wide with a warehouse about 75 feet by 300 feet on the north
side with rail connection, and a warehouse about 50 feet by 200 feet
with marginal wharf facing the turning basin. Both have highway
connections.
   Operations and results during fscal year.-Predredging surveys
were made at a cost of $1,086.77 from regular funds. With funds
provided by the Public Works Administration, maintenance dredg-
ing was in progress with U. S. hopper dredge Absecon from March
31 to May 26, 1934. There were removed 301,224 cubic yards, bin
measurement, of material which were deposited at sea beyond the
7-fathom contour opposite the inlet. The obstructive shoals in the
entrance channel leading from the ocean through the inlet and across
Lake Worth to the turning basin were removed. The cost was
$30,000 for maintenance.
   The costs during the fiscal year were $1,086.77 from regular funds
and $30,000 from Public Works funds, a total of $31,086.77, all for
maintenance. The expenditures were $29,126.24, all from Public
Works funds.
   Condition at end of fiscal year.-The obstructive shoals in the en-
trance channel leading from the ocean to the turning basin were re-
moved during the fiscal year with funds provided by the Public
Works Administration. The controlling depths at mean low water
are as follows: Outer bar cut, 19 feet for a width of 300 feet; between
jetties and land revetments, 17 feet for a width of 300 feet; ship
             RIVERS AND HARBORS-JACKSONVILLE,                                       FLA., DISTRICT          483
channel across Lake Worth, 16.2 feet for a width of 110 feet; and in
the turning basin, 15 feet for a width of 150 feet.
   The costs have been $1,086.77 from regular funds and $30,000 from
Public Works funds, a total of $31,086.77, all for maintenance. The
expenditures have been $29,126.24 from Public Works funds.
   Proposed operctions.-The balance unexpended July 1, 1934
 ($30,000), will be applied as follows:
Accounts payable June 30, 1934__                 ___--------------           $1, 086. 77
Maintenance:
    Dredging with U. S. dredge Sarasota, 11/4 months,
      July-August 1934, removing shoals in the turning
      basin ------------------------------------                   $8,913.23
    Repair of north jetty by hired labor, 3 months,
      February-April 1935                ------------------------ 20,000. 00
                                                                             28, 913. 23
        Total for all work---------------------------------                  30, 000. 00
  The balance unexpended on July 1, 1934, from allotments of
$30,000 from the National Industrial Recovery Act of 1933 ($873.76),
will be applied to the payment of outstanding obligations.
  The additional sum of $20,000 can be profitably expended during
the fiscal year 1936, to be applied to nmaintenance dredging with U. S.
hopper dredge Absecon in the bar cut and in the channel between
the jetties, 11/4 months, during July and August 1935.
                                           Cost and financial summary

                                 MAINTENANCE              AND IMPROVEMENT FIUNDS

Cost of new work to June 30, 1934 .- --       - - ---.
Cost of maintenance to June 30, 1934_____________________________                                     $1, 086. 77
       Net total cost to June 30, 1934__________________________                                       1, 086. 77
Minus accounts payable June 30, 1934____ __-____        -- ________                                    1, 086. 77
       Net total expenditures_____________________
Unexpended balance June 30, 1934 __.--                                                                30, 000.00
      Total amount appropriated to June 30, 1934 ____________                                         30, 000. 00

          Fiscal year ending June 30                         1930            1931   1932       1933       1934


Cost of new work
Cost of maintenance---...__-....------          .            ..---------------------------------         $1,086. 77
Total expended...-------------------.-----------------------
Allotted-----------------                ---------------------------------                               30, 000.00

Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934___ ------------------------------------            $30, 000. 00
Balance unexpended June 30, 1934_________________________          30, 000. 00
Outstanding liabilities June 30, 1934____________________________   1, 086. 77
      Balance available June 30, 1934------------------------ 28, 913. 23
                                                    PUBLIC    WORKS FUNDS

Cost of new work to June 30, 1934_-
Cost of maintenance to June 30, 1934_____________________________ 30, 000. 00
      Net total cost to June 30, 1934--------------------------30, 000. 00
Minus accounts payable June 30, 1934                                  873. 76
          Net total expenditures-----                                  _ -------                      29, 126. 24
Unexpended balance June 30, 1934__--------------                                                         873. 76
          Total amount appropriated to June 30, 1934.-                                 -----          30, 000. 00
484           REPORT          OF CHIEF OF ENGINEERS,                                       U.      S. ARMYl             1934


          Fiscal year ending June 30                          1930                 1931                1932            1933             1934


Cost of new work....          .    .        .    .       ..        .    .      .     .     . .         .      .    .
Cost of maintenance--........                            .......        .....-------------------------------....
                                                                                                         .$30,                            000. 00
Total expended_.................._.....__                                     ---
                                                                                --
                                                                                 ----   ----- -- -- -- -- -- --
                                                                                   -------                                             29,126.24
Allotted----........-........                        .                                    ---------------------------
                                                                             ...--------------                                         30,000. 00


Amount allotted from National Industrial Recovery Act approved
  June 16, 1933 ---------------------------------------------- $30, 000. 00
Gross amount expended ----------------------------------------  29, 126. 24
      Balance unexpended June 30, 1934___________________-__                                                                       -873. 76
Outstanding liabilities June 30, 1934___ __________________11___                                                                    873. 76
Amount that can be profitably expended in fiscal year ending June
                                                                                                                                2 0 , 0 00 . 0 0
30, 1936, for maintenance 1 ____________

       CONSOLIDATED         COST AND FINANCIAL                         SUMMARY           FOR LAKE WORTII                INLET, FLA.


Cost of new work to June 30, 1934--------                                                                                      -----
Cost of maintenance to June 30, 1934___ ______________                                                     _____               $31, 086. 77

      Net total cost to June 30, 1934________________     ___ -                                                                 31, 086. 77
Minus accounts payable June 30, 1934________________________                                                                     1, 960. 53
          Net total expenditures__________________________                                                                      29, 126. 24
Unexpended balance June 30, 1934__---                                                                                           30, 873. 76

          Total amount appropriated to June 30, 1934________________                                                            60, 000. 00

          Fiscal year ending June 30                          1930                 1931                1932            1933             1934


Cost of new work..--------   ------------------------------------------------------
Cost of maintenance-------------      -------------------------------------- $31, 086. 77
Total expended ....------------------------------                           ------------------------ ------------                      29, 126. 24
Allotted_---__ ----------------------------                    ------------                     ----                     ---           60, 000. 00


Amount allotted                   from          War Department                     Appropria-
   tion Act approved Apr. 26, 1934_________________                                                        $30, 000. 00
Amount allotted from National Industrial Recovery
Act approved June 16, 1933__ ___________--------30, 000. 00

Amount to be accounted for_______--- ____----------------                                                         _      - $60, 000. 00
Gross amount expended    _____________        ___-------29,                                                                     126. 24

      Balance unexpended June 30, 1934------------------------                                                                  30, 873. 76
Outstanding liabilities June 30, 1934                                                                                             , 960. 53
                                                                                                                                 1----------------------__

          Balance available June 30, 1934__________________________                                                             28, 913. 23
Amount that can be profitably expended in fiscal year ending June
   30, 1936, for maintenance 1_________________--________                                                                       20, 000. 00

              9. HOLLYWOOD HARBOR (PORT EVERGLADES),                                                                    FLA.

  Location.-Located on the east coast of Florida, about 23 miles
north of Miami and about 48 miles south of Lake Worth Inlet
(West Palm Beach). The site of the harbor is at Lake Mabel. (See
U. S. Coast and Geodetic Survey Charts Nos. 1248 and 3260.)
   1   Exclusive of available funds.
       RIVERS AND HARBORS-JACKSONVILLE,             FLA.,   DISTRICT    485
    Existing project.-This provides for the maintenance of the en-
trance channel, turning basin, and jetties constructed by local inter-
ests. The channel was dredged in rock to 35 feet deep and 210 feet
wide from the ocean to the turning basin on the west side of Lake
Mabel, a distance of about 6,900 feet, and the turning basin was
dredged in rock to from 18 to, 35 feet deep, 1,200 feet wide, and an
average length of about 1,200 feet. Two converging angular stone
jetties were constructed at the entrance, 500 feet apart, at the outer
ends and 1,200 feet apart, and parallel for a distance of 800 feet, at
.the shore ends. The north jetty is iabout 1,450 feet and the south
jetty 1,250 feet in length. Both jetties were built to 6 feet above
mean low water with top widths of 6 feet at the shore ends and 12
feet at the sea ends, side slopes 1 on 11/2. Two parallel steel sheet
piling bulkheads 800 feet apart protect the land points from erosion.
All depths are referred to mean low water. The mean tidal range
at the entrance is 2.6 feet. The extreme range is about 3 feet.
    Maintenance is estimated to cost $44,000 the first year and $35,000
annually thereafter.
    The existing project was adopted by the River and Harbor Act
approved July 3, 1930 (H. Doc. No. 357, 71st Cong., 2d sess.). The
latest published map is in the project document.
    Terminal facilities.-These consist of one slip about 1,200 feet long
by 300 feet wide, with steel bulkhead at the end and both sides,
providing about 2,700 feet of berthing space, with a depth of 35 feet.
A steel warehouse has been built, with railway and highway con-
nections. The facilities are adequate for present needs, though exten-
sive additions 'are contemplated.
    Operations and results during fiscal year.-Maintenance dredging
in the ship channel leading from the ocean to the turning basin and
in the turning basin was begun with U. S. hopper dredge Absecon
on May 28, 1934, and was in progress at the close of the fiscal year.
There were removed 129,968 cubic yards, bin measurement, of mate-
rial which were deposited at sea. The cost was $13,962.07 and the
expenditures $7,461.12.
    Condition at end of fiscal year.-The repair of the north and south
jetties was completed during the calendar year 1932. The removal
of shoals in the ship channel was partially completed. The present
controlling depths at mean low water are as follows: In the ship
channel, 31.2 feet for a width of 200 feet; in the northerly 800 feet
of the turning basin, about 30 feet.
    The total cost has been $62,154.16 for maintenance and the expendi-
tures $55,653.21.
    Proposed operations.-The balance unexpended on July 1, 1934
  ($37,443.68) will be applied as follows:
Accounts payable June 30, 1934----------------                   $6, 813. 42
Maintenance: Dredging with U. S. hopper dredge Absecon, 2/2
  months, July-September 1934, removing shoals as required_ ---_ 30, 630. 26
      Total for all work-_                                         37, 443. 68
   No funds can be profitably expended for maintenance during the
fiscal year ending June 30, 1936, as the work contemplated during
1935 Is expected to meet the needs of commerce during the period.
486          REPORT OF CHIEF OF ENGINEERS,                                             U.   S. ARMY,           1934

                                           Cost and finamncial summary
Cost of new work to June 30,. 1934____         __       __________
Cost of maintenance to June 30, 1934---------------------                                                           $62, 154. 16
      Net total cost to June 30, 19346_________-         ________                                                     62, 154. 16
Value of plant, materials, etc., on hand June 30, 1934 .__-... _____                                                      312. 47

      Net total cost to June 30, 1934_ ........ __   -------------- _ 62, 466. 63
Minus accounts payable June 30, 1934.            -____________------- 6, 813.42

     Net total expenditures------ ------------------                                                      __             55, 653. 21
Unexpended balance June 30, 1934-----    ---------                                          --------------               37, 443.68

          Total amount appropriated to June 30, 1934_                                            --
                                                                                              _------                    93, 096. 89

          Fiscal year ending June 30                       1930             1931              1932           1933            1934

Cost of new work-......................----                                                     -         -
Cost of maintenance_...-----------------                            _                   - $30, 970. 05    $17,222.04       $13,962.07

Total expended---.......-.--...-              ---.   -..    ---.   -----.          -        26, 238. 97    21, 953. 12       7, 461. 12

Allotted_-------..............---..--.-.                                $44, 000. 00         9, 000. 00   -4, 807. 91       44, 904. 80


Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934----------------------------------------------$30, 000. 00
Amount allotted from War Department Appropriation Act approved
July 14, 1932       ------------------------------------------15, 000. 00
      Amount to be accounted for- --------                                                                               45, 000. 00
Deductions on account of revocation of impounded funds----------                                                              95. 20

       Net amount to be accounted for----          ---
                                                 ___---                                                                  44, 904. 8G
Gross amount expended__________---____         __     $8,369. 51
Less reimbursements collected----            __--
                                          - -908.              39'
                                                                                                                          7, 461. 12

       Balance unexpended June 30, 1934 ___--__________--   ____                                                         37, 443. 68
Outstanding liabilities June 30, 1934_____-___________________                                                           6, 813. 42

           Balance available June 30, 1934-----------                                             --
                                                                                              ________              -- 30, 630. 26

                         10. MIAMI HARBOR (BISCAYNE BAY), FLA.

    Location.-Biscayne Bay is a large, shallow, salt-water sound lying
between the Florida Keys and the mainland on the east coast of
Florida near the southern extremity of the peninsula. (See U. S.
Coast and Geodetic Survey Charts Nos. 583 and 3260.)
    Ecmtisting project.-The project authorized by Congress provides
for a channel 25 feet deep at mean low water, 500 feet wide from
that depth in the ocean to near the outer ends: of the jetties, thence
300 feet wide through the entrance and across Biscayne Bay to the
municipal turning basin at Miami, and enlarging the turning basin,
and for two parallel stone jetties, 1,000 feet apart, the north one to be
3,000 feet long and the south jetty 2,750 feet long. The boundaries
of the turning basin are subject to conditional modification. The
present approved dimensions for the turning basin are 1,400 feet
from the west end of Biscayne Bay Channel to the terminals, and
1,150 feet in width. Total length of waterway under improvement
about 6 miles.
    The mean tidal variation is 2.2 feet at the entrance and 1.5 feet
in the bay. The extreme variation is about 3.5 feet at the entrance
           RIVERS AND HARBORS-JACKSONVILLE,       FLA., DISTRICT     487
and 2.4 feet in the bay. Strong easterly winds raise the water level
about 1.5 feet at the entrance and 1 foot in the bay. Strong westerly
winds lower the water level about 1 foot at the entrance and about
0.5 foot in the bay.
   The estimate of cost for new work, revised in 1930, was $3,674,700.
The latest (1930) approved estimate for annual cost of maintenance
is $71,000. The estimated cost of widening the Biscayne Bay Chan-
nel to 300 feet and enlargement of the turning basin is $885,000.
The River and Harbor Act approved July 3, 1930, limited expendi-
tures thereon to $200,000.
   The existing project was authorized by the following river and
harbor acts: The act of June 13, 1902, provided for an 18-foot chan-
nel in a land cut across the peninsula and for jetty construction
 (H. Doc. No. 662, 56th Cong., 1st sess.) ; the act of March 2, 1907,
fixed the width of the channel at 100 feet; the act of July 25, 1912,
provided for enlarging the channel to 20 feet deep and 300 feet wide,
and for extension of the jetties (H. Doc. No. 554, 62d Cong., 2d sess.) ;
the act of March 3, 1925, provided for the present dimensions at
the entrance and a width of 200 feet across Biscayne Bay (H. Doc.
No. 516, 67th Cong., 4th sess.); and the act of July 3, 1930, provided
for a width of 300 feet in the channel across the bay and enlarging
the municipal turning basin (River and Harbor Committee Doc.
No. 15, 71st Cong., 2d sess.). The latest published maps are in House
Document No. 516, Sixty-seventh Congress, fourth session, and Sen-
ate Document No. 95, Seventy-second Congress, first session. For
map of proposed widening of Biscayne Bay Channel see River and
Harbor Committee Document No. 15, Seventy-first Congress, second
session.
   Supplementing the work authorized by Congress, the enlargement
of the turning basin (as recommended in Rivers and Harbors Com-
mittee Doc. No. 15, 71st Cong., 2d sess.) and deepening the channel
to 30 feet from the ocean to and in the turning basin at Miami, with
the project widths now authorized, including a width of 300 feet in
the channel across the bay, at an estimated cost of $3,311,000, with
maintenance estimated at $9,000 annually in addition to that now
required for the adopted project, as recommended by the Chief of
Engineers under date of August 30, 1933 (Senate committee print,
73d Cong., 2d sess.), was included in the Public Works program
under the National Industrial Recovery Act.
  Recommended modifications of project.-Included in the Public
Works program.
  Local cooperation.-The modification of project recommended
August 30, 1933, and included in the Public Works program is sub-
ject to the provision that local interests furnish satisfactory assur-
ances that suitable and sufficient slips and berths adequate for the
full utilization of the increased depth will be provided at the ter-
minals at Miami. The required assurance was given by resolution
adopted by the commission of the city of Miami, and accepted by
the Secretary of War January 25, 1934, as complying with the terms
and conditions of the required local cooperation. All prior require-
ments have been complied with.
   Terminal facilities.-Not including the municipal piers, these con-
sist of 8 wharves, having a total frontage of 3,500 feet, 5 with 18 to
25 feet and 3 with 8 to 13 feet of water. Two of these wharves have
488    REPORT   OF CHIEF OF    ENGINEERS,    U.   S. ARMY,    1934

railway and highway connections. In addition to these, 6,250 feet
of berthing space has been completed on the south side of New Cut,
2,250 feet having 25 feet and 4,000 feet having 18 feet of water.
The facilities are adequate for present needs. (For further details
see Port Series No. 8, Corps of Engineers.)

           OPERATIONS   AND   RESULTS   DURING    FISCAL   YEAR


   Regular funds.-The repair, under contract, of the north and south
jetties was begun on November 4, 1933, and was completed on April
4, 1934. A total of 45,046.8 tons of granite, ranging in weight from 2
to 10 tons, was placed in the jetties, of which 30,697.1 tons were
placed in 2,065 linear feet of the north jetty and 14,349.7 tons in
700 linear feet of the south jetty. The cost was $231,864.10 for
maintenance.
   Public Works funds.-Dredging to widen the south side of the
25-foot turning basin was done under contract from September 22 to
December 12, 1933. There were removed 154,804 cubic yards of ma-
terial from approximately 234,000 square feet of turning basin at a
cost of $123,194.80 for new work. Dredging under contract, to
provide for increasing the depth to 30 feet in the existing project
channels and in the turning basin, was begun in the turning basin
on April 9, 1934, and in the channel across Biscayne Bay on April
25, 1934. To, the end of fiscal year 278,811 cubic yards of material
had been removed. Of this total 177,120 cubic yards were removed
from approximately 726,000 square feet of the turning basin and
101,691 cubic yards from 4,845 linear feet of channel at a total cost
of $237,981.09 for new work.
   Under regular funds the cost during the fiscal year was $14,644.79
for new work and $243,461.98 for maintenance, a total of $258,-
106.77; the expenditures were $278,418.90.       Under Public Works
funds the total cost was $361,175.89 for new work and the expendi-
tures $270,334.75. The grand total cost for the fiscal year under all
funds was $619,282.66, of which $375,820.68 was for new work and
$243,461.98 was for maintenance; the total expenditures were
$548,753.65.
   Condition ait end of fiscal year.-The existing 25-foot project,
authorized by Congress, was completed during the fiscal year 1934
with Public Works funds. The total length of the completed north
jetty and revetment is 4,688 feet and the completed south jetty and
revetment 3,850 feet.
   Supplementing the work authorized by Congress, dredging to
secure a depth of 30 feet throughout the project has been begun with
funds provided by the Federal Emergency Administration of Public
Works. The supplementary work is about 11 percent completed.
The work remaining to be done is the completion of dredging under
an existing contract.
   The controlling depths are as follows: Outer bar section, 25.9
feet for a width of 500 feet; Bar Cut section, 25.3 feet for a width
of 400 feet; channel between the jetties and revetments, 25.4 feet for
a width of 300 feet; channel across Biscayne Bay, 26 feet for a width
of 200 feet; and 25 feet for a width of 700 feet in the turning
basin.
            RIVERS AND HARBORS-JACKSONVILLE,                                                 FLA., DISTRICT                         489
   Under regular funds the cost of the existing project has been
$3,701,798.69 for new work and $1,197,710.84 for maintenance, a
total of $4,899,509.53;( the expenditures have been $4,956,104.50.
Under Public Works funds the total cost has been $361,175.89 for
new work and the expenditures $270,334.75. The grand total cost
under all funds has been $5,260,685.42, of which $4,062,974.58 was
for new work and $1,197,710.84 was for maintenance; the total ex-
penditures have been $5,226,439.25.
  Proposed operations.-The balance unexpended and accounts re-
ceivable on July 1, 1934 ($21,825.10), will be applied as follows:
Accounts payable June 30, 1934_ _-                                                                                              $944. 79
Maintenance :
    Miscellaneous surveys and investigations--__    -  $8,880. 31
    Care and preservation of the reservation -_____-_ 12, 000. 00
                                                                                                                              20, 880. 31

         Total for all work                    --------------------------------                                               21, 825. 10
  The balance unexpended July 1, 1934, from the allotments made
from the National Industrial Recovery Act ($1,931,791.29), will be
applied as follows:
Accounts payable June 30, 1934----------------_-----                                                                     $90, 841. 14
New work: Complete during July 1935, under contract, the dredg-
ing required to deepen the present 25-foot ship channel from the
open sea to Miami to a depth of 30 feet-------------------1,                                                            840, 950. 15

         Total for all work                      -------------------------------- 1, 931, 791. 29
   The additional sum of $55,000 can be profitably expended during
the fiscal year 1936, to be applied to maintenance of the channel
across Biscayne Bay during the fall of 1935.
                                              Cost and financial summary
                                    MAINTENANCE             AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934------------------------_ $3, 701, 798. 69
Cost of maintenance to June 30, 1934----------------------- 1, 197, 710. 84
      Total cost of permanent work to June 30, 1934----------      4, 899, 509. 53
Value of plant, materials, etc., on hand June 30, 1934 -----------     51, 873. 00
      Net total cost to June 30, 1934   --------------------                                                         4, 951, 382. 53
Plus accounts receivable June 30, 1934_    -----------------                                                              5, 666. 76
      Gross total costs to June 30, 1934--------------------4, 957, 049. 29
Minus accounts payable June 30, 1934___-------------------------    944. 79
         Net total expenditures--------------------------------4, 956, 104. 50
Unexpended balance June 30, 1934                                                              ----             __             16, 158. 34

         Total amount appropriated to June 30, 1934-                                                      --          4, 972, 262. 84

         Fiscal year ending June 30                            1930          1931            1932                 1933            1934


Cost of new work ---       .--                                            $35, 054.79 $158, 610. 72             -$900. 00       $14, 644. 79
Cost of maintenance-------_             ----------         223, 293. 45    55, 798. 62    14, 518. 85           3, 684. 42      243, 461. 98
      Total cost-----------------                 -__   __ 223, 293. 45    90, 853. 41   173, 129. 57           2, 784. 42      258, 106. 77
Total expended-........                ----          -     228, 130. 25    81,828. 46    201, 475. 89           17, 224. 82     278, 418. 90
Allotted- - - -          - _.........17,
                            --...........                       000. 00   250, 000. 00   _     -_.   ..        -2, 175. 71      282, 395. 82
490           REPORT OF CHIEF OF ENGINEERS, U.                                            S. ARMY,               1934

Balance unexpended July 1, 1933__.________________                                                                   $12, 181. 42
Amount allotted from War Department Appropri-
ation Act approved Apr. 26, 1934-----____-___  $10, 500. 00
Amount allotted from War Department Appropri-
ation Act approved July 14, 1932__ ----------- 274, 618. 58
                                                                                                                     285, 118. 58
     Amount to be accounted for--- ___- -_____-___--     -     _                                                    297, 300. 00'
Deductions on account of revocation of impounded funds--------                                                        2, 722. 76

      Net amount to be accounted for- --    ---              __-294,                                                         577. 24
Gross amount expended-__     ___- -    -   __    __-$320, 691.64
Less:
    Reimbursements collected--------$42, 254.67
    Receipts from sales _________-----   -   18. 07
                                                      42, 272. 74
                                                                                                                     278, 418. 90

      Balance unexpended June 30, 1934                                ___------           -          -------          16, 158. 34
Outstanding liabilities June 30, 1934 ----                              -----------------                              1, 938. 04

     Balance available June 30, 1934------------------------                                                          14, 220. 30
Accounts receivable June 30, 1934--------------------------                                                         -- 5, 666. 76

           Unobligated balance available June 30, 1934____-----_                                                      19, 887. 06

Amount that can be profitably expended in fiscal year ending
June 30, 1936, for maintenance 1_______-____55,                                                                             000. 00
                                                PUBLIC WORKS FUNDS

Cost of new work to June 30, 1934------                                   __---------------                          361, 175. 89
Cost of maintenance to June 30, 1934                                                                             ------------
      Total cost of permanent work to June 30, 1934 __-                                              ___--361,            175. 89
Minus accounts payable June 30, 1934_   --- ___-____-                                                                 90, 841. 14

     Net total expenditures__------------------------                                                                 270, 334. 75
Unexpended balance June 30, 1934----                                                                                  931, 791.29
                                                                                                                 1,1---------------__-

           Total amount appropriated to June 30, 1934_----------- 2, 202, 126. 04

       Fiscal year ending June 30               1930           1931                 1932                 1933                1934


Cost of new work---            ...-----------------.. ....   ------ ..----------------------------                         $361, 175. 89
Cost of maintenance..--------------------                             -----------------------                      --------------
Total expended......----        ..-----------      ----------------------------                           ....------------- 270, 334. 75

Allotted ._----                       .--------------
                                                ----------          ------------------..--------                        2, 202, 126. 04


Amount allotted from National Industrial Recovery Act ap-
proved June 16, 1933--------------      ------------------ $2, 219, 000.00

      Amount to be accounted for-____-------------        -__ 2, 219, 000. 00.
Deductions on account of revocation of allotment __________-__-16, 873. 96

      Net amount to be accounted for__ __ - __-___    _ 2, 202, 126. 04
Gross amount expended----------------------------------    270, 334. 75

     Balance unexpended June 30, 1934_--__ -___-------                                                            1, 931, 791. 29
Amount covered by uncompleted contracts-_______-__ _____                                                          1, 930, 192. 00

           Balance available June 30, 1934 _____1---------                                             ____          -1,      599. 29

Amount (estimated) required to be appropriated   for completion
                                           -- - -- - -
  of Public Works Administration project 1              ___ __                                                       800, 000. 00
   1   Exclusive of available funds.
           RIVERS AND HARBORS-JACKSONVILLE                                       FLA.,    DISTRICT                 491
CONSOLIDATED COST AND FINANCIAL SUMMARY FOR MIAMI HARBOR                                      (BISOAYNE BAY),
                                   FLA.

Cost of new work to June 30, 1934--------------        ---- $4, 062, 974. 58
Cost of maintenance to June 30, 1934_ -_................-. . 1, 197, 710. 84
      Total cost of permanent work to June 30, 1934---------- 5,260, 685. 42
Value of plant, materials, etc., on hand June 30, 1934----------- 51, 873. 00

      Net total cost to June 30, 1934------------------------ 5, 312, 558. 42
Plus accounts receivable June 30, 1934------------------------     5, 666. 76

      Gross total costs to June 30, 1934------------------- 5, 318, 225. 18
Minus accounts payable June 30, 1934-..-----------------  -1    91, 785.93

     Net total expenditures   --------------------------                                          5, 226, 439. 25
Unexpended balance June 30, 1934 ------------------------                                         1, 947, 949. 63

         Total amount appropriated to June 30, 1934--------------                                  7, 174, 388. 88

  LFiscal year ending June 30             1930             1931             1932           1933             1934


Cost of new work. __    ____                             $35, 054. 79   $158, 610. 72      -900. 00        $375, 820. 68
Cost of maintenance .--.-.-----..     $223, 293. 45       55,798. 62      14,518. 85       3, 684. 42       243, 461. 98
      Total cost---                       223, 293. 45
                              ..---------------           90, 853. 41    173, 129. 57      2, 784. 42       619, 282. 66

Total expended----------                228, 130. 25      81,828. 46     201, 475. 89     17, 224. 82       548, 753. 65

Allotted___----------------------        17, 000. 00     250, 000. 00                    -2,175.71        2, 484, 521.86


Balance unexpended July 1, 1933----------------------                                                   $12, 181. 42
Amount allotted from War Department Appropria-
tion Act approved Apr. 26, 1934---------------$10, 500. 00
Amount allotted from War Department Appropria-
  tion Act approved July 14, 1932---------------      274, 618. 58
Amount allotted from National Industrial Recov-
ery Act approved June 16, 1933--------- ---       2, 219, 000. 00
                                                                                                   2, 504, 118. 58
     Amount to be accounted for------------------------                                            2,516, 300. 00
Deductions on account of revocation of-
   Impounded funds_-----------------                                                2, 722. 76
   Allotment----------------------------- --                                       16, 873. 96
                                                                                                         19, 596. 72
      Net amount to be accounted for    ---------------------                                      2, 496, 703. 28
Gross amount expended----------------                       591, 026. 39
Less:
    Reimbursements collected -------  $42, 254. 67
    Receipts from sales--------------         18. 07
                                                                                   42,272. 74
                                                                                                        548, 753. 65
      Balance unexpended June 30, 1934-------------------                                          1, 947, 949. 63
Outstanding liabilities June 30, 1934------------   1, 938. 04
Amount covered by uncompleted contracts------- 1, 930, 192.00
                                                                                                   1, 932, 130. 04
     Balance available June 30, 1934------------------------                                             15, 819. 59
Accounts receivable June 30, 1934---------------------------                                              5, 666. 76
     Unobligated balance available June 30, 1934------------                                             21,486. 35

Amount (estimated) required to be appropriated       for completion
                                          - - - - - - - -- - - - - - - - - - -
of Public Works Administration project 1                                                               800, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1936, for maintenance 1--_                                                                     55, 000. 00
  1 Exclusive of available funds.
492      REPORT    OF CHIEF OF ENGINEERS,           U.   S. ARMY,   1934

                            11. MIAMI RIVER, FLA.

   Location.-Rises in the southeasterly edge of the Everglades and
flows southeast and east, emptying into Biscayne Bay about 1 mile
south of the turning basin at the Miami municipal piers, the terminus
of the Miami Harbor project. (See U. S. Coast and Geodetic Sur-
vey Chart No. 583.)
   Existing project.-This provides for a channel 150 feet wide and
15 feet deep for a distance of 3 miles above the mouth, thence 125
feet wide and 15 feet deep to a point 41/ miles above the mouth,
thence 90 feet wide and 15 feet deep to a point 51/2 miles above the
mouth, each section to have suitable side slopes. The mean range
of tide at the mouth is 1.4 feet. The extreme range is about 1.7 feet.
   The project also provides for an approach channel 700 feet wide
and 6 feet deep to the harbor line at the seaplane base at Dinner
Key, with an enlargement at the inner end, and for a channel 8 feet
deep and 50 feet wide along the easterly edge, at an estimated cost
of $120,000, with maintenance estimated at $2,000 annually.
   The Miami River Channel was authorized by the River and Harbor
Act o f July 3, 1930, which authorized the appropriation of $800,000
for the prosecution of the work.
  The channel in the vicinity of Dinner Key was authorized by the
following item in the War Department Appropriation Act approved
July 14, 1932:
   That the existing project for the improvement of the Miami River, Fla.,
authorized by the River and Harbor Act approved July 3, 1930, is hereby modi-
fied to include the improvement recommended by the Chief of Engineers in the
report submitted in Senate Document No. 95, Seventy-second Congress, first
session, provided that the authorization of $800,000 for the existing project shall
not be increased but is hereby continued as the total authorization for the
project as herein modified.
   The latest published map of the locality is contained in Senate
Document No. 95, Seventy-second Congress, first session.
   Local cooperation.-Fullycomplied with.
   Ternminal facilities.-There are a number of small privately owned
marginal wharves along the river, with a total berthing space of
about 900 feet. All wharves have highway connection. Railway
connection is not provided. The facilities are adequate for the
present needs. (For further details see Port Series No. 8, Corps of
Engineers.)
   Operations and results during fiscal year.-Dredging under con-
tract, to provide the 15-foot channel, in progress at the beginning of
the fiscal year, was completed August 28, 1933. A total of 44,937
cubic yards of material, principally rock and mud, was removed.
Project dimensions were secured for a distance of about 1,100 linear
feet. The cost was $26,607.99 for new work.
   A contract for dredging an approach channel to the seaplane base
at Dinner Key, in progress at the beginning of the fiscal year, was
completed on August 30, 1933. A total of 112,074 cubic yards of
material, chiefly sand with a small amount of silt and stone, was
removed, the bulk of which was deposited on Dinner Key behind
bulkheads constructed by local interests. The cost was $20,019.22
for new work.
         RIVERS AND HARBORS-JACKSONVILLE,                                   FLA., DISTRICT                     493
   The total cost during the fiscal year was $46,627.21, all for new
work. The total expenditures were $81,695.60.
   Condition at end of fiscal year.-The existing project was com-
pleted during the calendar year 1933 at a cost of $581,378.58 for the
work in Miami River and $65,536.59 for the work at the Dinner Key
seaplane base, representing a total saving of $153,085 under the total
estimated cost. The controlling depths at local mean low water are
11.2 feet in Miami River, and 6 feet at the Dinner Key airport
channel.
   The total cost and expenditures on the existing project have been
$646,915.17, all for new work.
   Proposed operations.-No funds are available.
   No funds can be profitably expended for maintenance during the
fiscal year 1936 as no work is expected to be required to meet the
needs of commerce during this period.
                                   Cost and financial sum/mary

Cost of new work to June 30, 1934 ----------------                                ______           $646, 915. 17
Cost of maintenance to June 30, 1934__
      Total cost of permanent work to June 30, 1934_ .... ___----                                   646, 915. 17
Net total expenditures---     ------------------------                                              646, 915. 17
Total amount appropriated to June 30, 1934 ________        ______                                   646, 915. 17

        Fiscal year ending June 30                 1930         1931         1932           1933             1934


Cost of new work-__-------------_-------           --     ---             $83, 262. 82 $517, 025. 14       $46, 627. 21
Cost of maintenance .--------------------------------------------------------------
Total expended   ..      .
                      --------------------------                -------    60,,475. 20   504, 744. 37       81, 695. 60

Allotted -----.---------------------------------            -----------   578, 000. 00    67, 627. 88        1, 287. 29


Balance unexpended July 1, 1933___________________________                                          $80, 408. 31
Amount allotted from War Department Appropriation
  Act approved July 14, 1932--__   ------
                                    ___----             $5, 500. 00
Amount allotted from Emergency Relief and Construc-
  tion Act approved July 21, 1932 _____________________      42.75
                                                                                                         5, 542. 75
     Amount to be accounted for___ ---------                              _____                         85, 951. 06
Deductions on account of revocation of-
    Allotment -..--------------------------------                                   3, 934. 70
   Impounded funds---------------                                                      320.75
                                                                                                         4, 255. 46

      Net amount to be accounted for                                                                    81, 695. 60
                                                                                                        8-------------------
Gross amount expended______________________________ 85, 854. 03
Less reimbursement collected _______-______     ____ 4, 158. 43
                                                                                                        81, 695. 60
                               12. KEY WEST HARBOR, FLA.

  Location.-Key West is located on the island of Key West, near
the western end of the Florida Keys. It is about 516 statute miles
from Jacksonville, 644 statute miles from New Orleans, and 220
miles south of the entrance to Tampa Bay. (See U. S. Coast and
Geodetic Survey Chart No. 584.) The harbor proper lies in front
of the town.
494    REPORT   OF CHIEF OF ENGINEERS1 U.      S.   ARMY,   19 34


   Previous projects.-Adopted by act of August 2, 1882. The cost
and expenditures were $27,500, of which $25,000 was for the im-
provement work and $2,500 was for the survey. For further details
see page 1827 of Annual Report for 1915.
   Existing project.-This provides for the removal of coral heads
and reefs from the main ship channel and anchorage, so as to give a
clear depth of 30 feet at mean low water and a width in the channel
of 300 feet; and for a northwest entrance channel with a depth of 17
feet at mean low water and of sufficient width for navigation to be
obtained by the construction of a stone jetty on each side of the
entrance and by dredging; removing the middle ground to the extent
of widening the channel opposite the wharves to a width of 800 feet
and a depth of 26 feet at mean low water. The mean range of tide
is 2.6 feet at the northwest entrance and 1.3 feet in the main ship
channel and in the harbor. The extreme range of tide is 3.2 feet at
the northwest entrance, 1.7 feet in the main ship channel, and 1.7 feet
in the harbor.
   The estimate of cost of the east jetty at the northwest entrance was
$500,000; for the extension of the east jetty, $200,000; and for the
west jetty, $900,000; or $1,600,000 in all, exclusive of amounts ex-
pended on previous projects. No approved estimate of cost of dredg-
ing work at that entrance has been made. The estimated cost of
the work in the main ship channel and the anchorage was $48,000.
Estimated cost of the work in removing the middle ground was
$321,200, or a total estimated cost of $1,969,200 for new work. The
latest (1931). approved estimate for annual cost of maintenance,
exclusive of the jetties, is $13,500.
   The existing project was authorized by the following river and
harbor acts: The River and Harbor Act of September 19, 1890, pro-
vided for the northwest entrance (H. Doc. No. 145, 50th Cong., 2d
sess., and H. Ex. Doc. No. 39, 51st Cong., 1st sess., reprinted in An-
nual Reports for 1889, pp. 1328-1337, and for 1890, pp. 1581-1596),
this being later modified by special act approved May 28, 1908, which
authorized the application of funds already appropriated to the
removal of certain reefs in the main ship channel; the River and
Harbor Act of July 25, 1912, provided for the main ship channel
 (H. Doc. No. 706, 62d Cong., 2d sess.). The removal of the middle
ground was provided for by the act of July 18, 1918 (H. Doc. No.
185, 65th Cong., 1st sess.). The latest published maps are in House
Document No. 706, Sixty-second Congress, second session; House
Document No. 680, Sixty-third Congress, second session; and House
Document No. 185, Sixty-fifth Congress, first session.
   Terminal facilities.-These consist of 4 wharves and 6 piers. All
have connections with city streets, two piers having rail connections.
Terminals are adequate for present needs, and with the exception of
one wharf are open to the public. In addition to the above there are
four Government piers. (For further details see Port Series No. 8,
Corps of Engineers.)
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project as a whole is
about 50 percent completed. The project for the main ship channel
       RIVERS AND     IIARBORS-JACKSONVILLE,          FLA.,    DISTRICT        495
and anchorage was completed in the calendar year 1914, at a total
cost of $31,384.23. A clear channel with a least depth of 30 feet at
mean low water and a least width of 300 feet was made through the
main ship channel, and a reef in the anchorage area, with only 22
feet of water over it, was removed to a depth of 30 feet. A channel
18 feet deep and 250 feet wide was dredged through the northwest
channel bar in 1921. The removal of the middle ground was com-
pleted in the calendar year 1923, the channel being dredged to a
depth of 26 feet at mean low water for a width of 800 feet and a
length of 3,835 feet opposite the wharves. At the northwest en-
trance the west jetty has been built to a height of from 3 to 5 feet
below mean low water for a length of 6,452 feet, and the east jetty
has been built to a height of 3 feet above mean low water for a length
of 5,642 feet and to a height of from 5 to 7 feet below mean low water
for a farther length of 5,712 feet. The last work on the west jetty
was done in the fiscal year 1900 and that on the east jetty in the fiscal
year 1909. No further work on the jetties is considered necessary.
At the end of the fiscal year the controlling depths at mean low water
were 30 feet for a width of 300 feet in the main ship channel, 26 feet
for a width of 800 feet in the middle ground, and 18.1 feet for a width
of 160 feet in the northwest channel. The work necessary to complete
the project is the completion of the jetties at the northwest channel.
The west jetty is about 20 percent complete, the east jetty is about 67
percent complete, and the jetties as a whole are about 60 percent
complete.
   The total cost of the existing project has been $1,198,911.34, of
which $1,012,908.75 was for new work and $186,002.59 was for main-
tenance, including $33,658.67 for new work in the main ship channel,
$2,274.44 expended in removing coral heads from the main ship
channel under authority given in the special act of May 28, 1908, and
$345,887.16 expended for new work in removal of the middle ground.
The total expenditures have been $1,198,911.34.
   Proposed operations.-The balance unexpended July 1, 1934
 ($27,000), will be applied to maintenance dredging with U. S. hopper
dredge Absecon, 2 months, December 1934-January 1935, in removing
shoals at the northwest entrance.
   No funds can be profitably expended for new work or maintenance
during the fiscal year ending June 30, 1936, for the reason that the
commerce using the northwest entrance channel does not justify the
relatively high cost of completing the jetties and the maintenance
work contemplated during the fiscal year 1935 is expected to meet the
requirements of commerce during this period.
                         Cost and financial summary

Cost of new work to June 30, 1934_              --
                                         -_______               $1, 040, 408. 75
                                                          -___________
Cost of maintenance to June 30, 1934__________________________      186, 002. 59

      Total cost of permanent work to June 30, 1934           ____    1__226, 411. 34
                                                                     -1,

                       -----------------
Net total expenditures____                                            1, 226, 411. 34
Unexpended balance June 30, 1934 __________________________               27, 000. 00

      Total amount appropriated to June 30, 1934-------------         1, 253, 411. 34
      91536--ENG 1934--32
496          REPORT OF CHIEF                         OF ENGINEERS, U.                           S.   ARMY,      1934


        Fiscal year ending June 30                             1930               1931           1932         1933            1934


Cost of new work        -----------------------------------------------------------------                                      -
Cost of maintenance__       _________________                  $774. 23        $8, 161. 01    $18, 422. 78     $17. 71         --
Total expended___--_______________________                   5, 708. 09         1,873. 90      24, 709. 89      17. 71    -    -----
Allotted--      ---------------------------                  3,000. 00         25, 000. 00   ------------    2, 788. 66   $27, 000. 00


Amount allotted from War Department Appropriation Act ap-
  proved Apr. 26, 1934_                _________                                                                      $27, 000'. 00
Balance unexpended June 30, 1934 ________________________ _                                                            27,000.00
Amount (estimated) required to be appropriated for completion
  of existing project 1_______________________________________                                                       956, 300.00

13. CALOOSAHATCHEE                           RIVER AND LAKE OKEECHOBEE                                               DRAINAGE
                                                AREAS, FLORIDA

   Location.-The Caloosahatchee River has its source in Lake Okee-
chobee and flows in a general southwesterly direction, emptying into
the Gulf of Mexico through San Carlos Bay, about 30 miles south of
the entrance to Charlotte Harbor. (See U. S. Coast and Geodetic
Survey Charts Nos. 473 and 1255.)
   Lakce Okeechobee is a large fresh-water lake located in south
central Florida. (See U. S. Coast and Geodetic Survey Charts Nos.
804 and 805.)
   St. Lucie Canal was constructed by the Everglades drainage dis-
trict as a control canal for Lake Okeechobee. It begins at about the
middle of the east shore of Lake Okeechobee and empties into the
south branch of the St. Lucie River.
   St. Lucie River, south branch, from the entrance of the St. Lucie
Canal flows north for about 6 miles to Stuart where it joins the
northwest branch forming the St. Lucie River thence east, south-
east, and east about 7 miles, emptying into the Indian River oppo-
site St. Lucie Inlet. (See U. S. Coast and Geodetic Survey Chart
No. 1247.)
   Taylor Creek is formed by the junction of several small creeks
that have their headwaters in Allapattah Flats and flows generally
in a southeasterly direction, emptying into Lake Okeechobee at its
most northerly extremity. (See U. S. Coast and Geodetic Survey
Chart No. 804.)
   For description of above waterways see page 705, Annual Report
for 1932.
   Previous projects.-Adopted by acts of August 2, 1882, and August
11, 1888. The cost and expenditures for these projects were $149,-
585.76, of which $9,456.59 was for new work below Fort Myers;
and $17,993.17 was for new work, and $122,136 for maintenance above
Fort Myers. For further details see page 707, Annual Report for
1932.
   Existing project--The project for lower Caloosahatchee River
provides for a channel 200 feet wide and 12 feet deep at mean low
water from the Gulf of Mexico to Punta Rasa, a distance of about
3.5 miles, thence 100 feet wide and 10 feet deep at mean low water
to Fort Myers, a distance of about 16 miles, with a turning basin
  1Exclusive of available funds.
       RIVERS AND HARBORS-JACKSONVILLE,          FLA.,   DISTRICT   497
at that point. The project for Caloosahatchee River and Lake Okee-
chobee drainage areas provides for improving the Caloosahatchee
River and Canal from Lake Okeechobee to the Gulf of Mexico by
straightening and by dredging a channel which will provide a dis-
charge outlet capacity of 2,500 cubic feet per second from Lake Okee-
chobee and a navigation channel at least 6 feet deep and 80 feet wide,
including necessary control works (Lake Okeechobee to Fort Myers,
65 miles), ilmproving Taylor Creek by providing a channel 6 feet
deep, when the lake is at elevation 14, and 60 feet wide from Okee-
chobee City into Lake Okeechobee, a distance of about 4.8 miles,
providing a levee and a navigation channel 6 feet deep when the lake
is at elevation 14 and 80 feet wide, following in general the south
shore of the lake for a distance of about 63 miles, and a north shore
levee about 21 miles long; providing for the protection of the St.
Lucie Canal from erosion and silting, and improving St. Lucie River
to provide a channel 6 feet deep at local mean low water and 80
feet wide from St. Lucie Canal to Indian River, a distance of about
13 miles. The project document authorized the levees to be con-
structed with muck core capped with 3 feet of rock to elevation 31
feet above mean low water at Punta Rasa, and to be so built as to
be capable of being raised an additional 3 feet, and crest width of
10 feet; lake-side slope 21 to 1 with rock riprap 31/2 feet thick and
land-side slope 21/2 to 1 with rock riprap 2 feet thick.
    All levees are subject to modification of location and design at the
discretion of the Chief of Engineers. The mean range of tide at
Punta Rasa is 1.7 feet. The extreme range is 2.2 feet. Tidal in-
fluence is perceptible at La Belle, 55 miles above Punta Rasa, at low-
river stage. The mean range of tide at St. Lucie Inlet is 2.6 feet.
The extreme range is about 3 feet.
    The estimate of cost for new work, revised in 1934, is $15,200,000,
exclusive of amounts expended on previous projects, and of which
 $2,000,000 is to be contributed by local interests, and $895,750 reim-
bursable by local interests for construction of drainage culverts.
The latest (1928) approved estimate for annual cost of maintenance,
outside the limits of the Everglades drainage district is $15,000.
    The existing project for the Caloosahatchee River below Fort
Myers was adopted by the River and Harbor Act of June 25, 1910
  (Rivers and Harbors Committee Doc. No. 8, 61st Cong., 2d sess.).
The existing project for the Caloosahatchee River and Lake Okee-
chobee drainage areas was adopted by the River and Harbor Act of
July 3, 1930 (S. Doc. No. 115, 71st Cong., 2d sess.)., The latest pub-
lished map of the lake is in the latter document, and maps of the
remainder of the project are in House Document No. 215, Seventieth
Congress, first session.
    Local cooperation.-The River and Harbor Act of July 3, 1930,
adopting the existing project, provides that the State of Florida or
other local interests shall contribute $2,000,000 toward the cost of the
improvements, that no expense shall be incurred by the United States
for the acquirement of any lands necessary for the purpose of this
improvement, and agree to maintain all works and channels within
  the limits of the Everglades drainage district and to charge no tolls
on any of these navigable waterways and that whenever authorized
  by Congress the United States shall have the right to modify or
498    REPORT OF CHIEF OF ENGINEERS,        U.   S.   ARMY,   1934


improve any of these waterways and their appurtenant structures,
and that the St. Lucie Canal, the Caloosahatchee Canal, and the other
channels forming the proposed cross-State waterway shall be navi-
gable waters of the United States and subject to the Federal laws
for the protection of such waterways.
   The State legislature created a flood-control district known as the
Okeechobee flood-control district, with a board of commissioners hav-
ing conditional authority to levy taxes and to issue bonds for the
purpose of complying with the conditions of local cooperation;
$450,000 has been .contributed by this district toward the cost of
the improvements.
   Terminal facilities.-In the vicinity of Fort Myers on the Caloosa-
hatchee River these consist of 3 freight piers, 1 railroad terminal
pier, 1 municipal recreation pier, and 4 privately owned piers.
There are numerous small wooden-pile landings along the upper
Caloosahatchee River along the lake shore, in St. Lucie Canal, and
St. Lucie River, including one railroad terminal pier at Stuart. The
facilities are adequate for present needs.
            OPERATIONS AND RESULTS DURING FISCAL YEAR


   Regular funds.-Construction surveys, preliminary surveys, and
subsurface explorations have been continued. A total of 37 miles
of floodway and navigation channel in the Caloosahatchee River and
Canal has now been surveyed. All preliminary survey work, in-
cluding borings, rights-of-way, office computations, designs, and
mapping, was about 98 percent completed; the fiscal year cost was
$54,730.24. The U. S. pipe-line dredge Welatka began construction
of the hydraulic levee west of Moore Haven on January 8, 1934.
Between January 8, and June 30, 1934, 1,449,175 cubic yards of ma-
terial were placed into the levee embankment over a distance of
19,300 linear feet and 33,793 cubic yards of muck wasted, at a cost of
$214,579.49. This work is still in progress. Between September 19,
1933, and February 21, 1934, the U. S. pipe-line dredge Congaree
removed 865,577 cubic yards of muck overburden in connection with
levee and navigation channel between Miami Locks and Pahokee,
at a cost of $58,894.22. In the St. Lucie River, this dredge removed
301,640 cubic yards of material between March 16, and May 19,
1934, at a cost of $30,515.06 for maintenance, and the U. S. pipe-line
dredge Sarasota removed 124,948 cubic yards of material between
March 12, and June 27, 1934, at a cost of $17,432.37 for maintenance.
The leased pipe-line dredge Alice removed 110,403 cubic yards of
material from the St. Lucie River between March 24, and April 14,
1934, at a cost of $10,947.40 for maintenance. The U. S. dipper
dredge Mayaca continued dredging Liberty Point auxiliary floodway
channel between Liberty Point and Rocky Reef, excavating between
July 1, 1933, and March 15, 1934, a total of 120,282 cubic yards of
material over a distance of 10,900 linear feet at a cost of $35,183.18.
Revetment of the channel slopes to protect the levee from wave ac-
tion was begun on April 6, 1934, and continued to the end of the
fiscal year. A total of 10,611 square yards of concrete paving was
placed over a distance of 5,780 linear feet between Clewiston and
Little Bare Beach and 9,567 square yards were placed over a distance
       RIVERS   AND IIARBORS-JACKSONVILLE,       FLA.,   DISTRICT   499
of 5,701 linear feet between Liberty Point and Moore Haven at a
cost of $20,360.78. This work is still in progress.
    Contract for the construction of 35,000 linear feet of levee and
navigation channel between Clewiston and Moore Haven, in progress
at beginning of fiscal year, was completed September 13, 1933. Be-
tween July 1 and September 13, 1933, a total of 308,062 cubic yards
of material was placed in the levee embankment at a cost of $45,-
180.16. Contract for the construction of 65,000 linear feet of levee
and navigation channel between Miami Locks and Pahokee, and in
progress at beginning of fiscal year, was terminated by supplemental
agreement dated June 14, 1934. Under this contract, between July 1,
1933, and June 14, 1934, 1,121,659 cubic yards of material were placed
in the levee embankment and 80 cubic yards of riprap were placed
at a cost of $204,325.28. Work under contract, for the removal of
muck overburden between Miami Locks and Pahokee, was begun on
September 1, and completed October 23, 1933. A total of 167,184
cubic yards of muck was removed and wasted over a distance of
6,995 linear feet at a cost of $6,828.77. Work under contract for the
removal of muck overburden between Miami Locks and Pahokee
was begun December 27, 1933, and completed January 31, 1934. A
total of 74,470 cubic yards of muck was removed and wasted over a
distance of 2,834 linear feet at a cost of $5,983.86. Continuing con-
tract was entered into for dredging 45,000 linear feet of auxiliary
floodway channel between Lake Okeechobee and Nicodemus Slough
and for the construction of 97,900 linear feet of levee and navigation
channel between Moore Haven and Fisheating Creek, and work was
in progress on the floodway channel at beginning of fiscal year; this
portion was completed July 21, 1933. Between July 1 and 21, 1933,
inclusive, 103,143 cubic yards of material were removed from the
floodway channel at a cost of $16,127.99. Work on the levee embank-
ment portion was begun July 22, 1933. Between July 22, 1933, and
June 30, 1934, 2,241,190 cubic yards were placed in the levee embank-
ment at a cost of $325,900.15. This contract was modified by a sup-
plemental agreement under which the United States took over and
is prosecuting by Government plant and hired labor approximately
one-half of the original contract. Work under the modification is
still in progress.
    The total cost for the fiscal year for new work was $1,058,028.26;
of this $1,057,434.70 was from regular United States funds and
 $593.56 was from contributed funds, and for maintenance work the
cost was $59,564.81, regular United States funds. The total expendi-
tures were $1,543,314.26, of which $593.56 were from contributed
,funds and $1,542,720.70 were from regular United States funds.
    Public Wo'rks funds.-The U. S. dipper dredge Mayaca, was en-
gaged in dredging Liberty Point auxiliary floodway channel between
Liberty Point and Rocky Reef, excavating a total of 51,246 cubic
yards of material, over a distance of 6,513 linear feet between March
16 and June 12, 1934, at a cost of $17,144.48. On June 13, 1934, the
May~aca began work in division 9 levee, east shore of Lake Okeechobee,
in building toe dikes in assistance to the U. S. pipe-line dredge Gulf-
port. This work is still in progress. The U. S. pipe-line dredge
Giulfport began work on May 4, 1934, on construction of section 1
of division 9 levee, placing 231,361 cubic yards in levee embankment,
wasting 286,415 cubic yards of muck, at a cost of $66,379.68, and
500     REPORT OF    CHIEF OF    ENGINEERS,     U.   S. ARMY,   1934

advancing a distance of 4,147 linear feet. This work is still in
progress.
   Contract was entered into under date of October 6, 1933, for the
construction of 19,541 linear feet of levee and navigation channel
between Clewiston and Liberty Point. Work was begun October 24,
1933, and is still in progress. Under this contract 931,182 cubic
yards of material have been placed in the levee embankment at a
cost of $159,418.84. Contract was entered into under date of October
19, 1933, for the construction of 25,300 linear feet of levee and navi-
gation channel between Clewiston and Little Bare Beach. Work
was begun November 17, 1933, and is still in progress. Under this
contract 930,118 cubic yards of material have been placed in the
levee embankment at a cost of $212,357.39. Contract was entered
into under date of October 19, 1933, for the construction of 29,205
linear feet of levee and navigation channel between Little Bare
Beach and Miami Locks. Work was begun November 25, 1933, and
is still in progress. Under this contract 597,041 cubic yards of
material have been placed in the levee embankment and 871,336
cubic yards of muck overburden have been wasted at a cost of
$255,050.04. Contract was entered into under date of October 14,
1933, for the construction of 4 concrete hurricane gates, 1 located
at Clewiston, 1 at Miami Canal at Lake Harbor, 1 at the junction
of the North New River and Hillsborough Canals near Belle Glade,
and 1 at the West Palm Beach Canal at Canal Point. Work
was begun November 20, 1933, and is still in progress. Under this
contract 50 percent of the work has been completed at a cost of
$545,863.33. Contract was entered into under date of October 7,
1933, for the construction of 6 concrete culverts located along the
south and southwest shores of Lake Okeechobee between South Bay
and Fisheating Creek. Work was begun on December 2, 1933, and is
still in progress. Work under this contract was 80 percent com-
pleted at a cost of $228,492.91. Contract was entered into under
date of December 19, 1933, for the construction of one concrete
drainage culvert located 3 miles north of Belle Glade. Work was
begun on July 19, 1933, and was completed on May 11, 1934, at a
cost of $48,513.35. The total cost for the fiscal year from Public
Works Administration funds was $1,533,220.02, all for new work;
the total expenditures were $1,338,118.42.
   Su~mary.-The total cost for the fiscal year was $2,650,813.09;
the cost of new work was $1,057,434.70 from regular funds, $1,533,-
220.02 from Public Works funds, and $593.56 from contributed
funds, a total of $2,591,248.28; the cost of maintenance was $59,564.81,
all from regular funds. The total expenditures during the fiscal
year were $2,881,432.68, of which $1,542,720.70 were from regular
funds, $1,338,118.42 from Public Works funds, and $593.56 from
contributed funds.
   Condition at end of fiscal year-regular funds.-The existing
project is about 25 percent complete. The portion of the Caloosa-
hatchee River below Fort Myers and on the bar at the entrance was
completed in 1913. The work to be done to complete the project as
authorized by the River and Harbor Act of July 3, 1930, involves:
  (a) The improvement of the Caloosahatchee River and Canal from Lake
Okeechobee to the Gulf of Mexico by straightening and dredging the channel
which will provide a discharge outlet capacty of 2,500 second-feet from Lake
        RIVERS AND HARBORS-JACKSONVILLE,                              FLA., DISTRICT                501
Okeechobee and a navigation channel at least 6 feet deep and 80 feet wide,
including the necessary control works.
   (b) Dredging Taylors Creek to provide a channel 6 feet deep and 60 feet
wide from Okeechobee City into Lake Okeechobee.
  (c) Complete the construction of a levee and navigation channel 6 feet deep
and 80 feet wide, following in general the south shore of the lake.
  (d) The construction of a levee on the north shore of the lake.
   (e) Provision of suitable protection works on the St. Lucie Canal.
   The approximate controlling depths at low water are as follows:
St. Lucie River, 7 feet; St. Lucie Canal, 6 feet; Lake Okeechobee to
Clewiston, 5 feet; Lake Okeechobee to Moore Haven, 21/2 feet;
Moore Haven to Fort Myers, 21/2 feet; Fort Myers to Punta Rasa,
91/2 feet; and Punta Rasa to the Gulf, 11 feet. The water level of
Lake Okeechobee ranged from 17.5 to 1.4.1 feet with an elevation of
16.4 feet at the close of the fiscal year.
   The cost of the existing project has been $2,511,025.30 for new
work, and $213,664.85 for maintenance, a total of $2,724,690.15; the
expenditures have been $3,086,669.04. Under Public Works funds
the cost has been $1,533,220.02, all for new work, and the expendi-
tures $1,338,118.42. Under contributed funds the cost and expen-
ditures have been $220,205.70, all for new work. The grand total
cost under all funds has been $4,478,115.87, of which $4,264,451.02
was for new work and $213,664.85 was for maintenance; the grand
total expenditures have been $4,644,993.16, of which $4,424,787.46
were United States funds, and $220,205.70 were contributed funds.
    Proposed operations.-The balance unexpended and accounts re-
ceivable July 1, 1934 ($1,356,991.58 United States regular funds and
 $229,794.30 contributed funds, total $1,586,785.88), will be applied as
follows :
Accounts payable June 30, 1934-------------------------------                                $63, 844. 02
New work:
    Completion during October 1934 of contract for
      construction of 12 miles of levee and flood-
      way channel between Moore Haven and Fish-
      eating Creek----------------------------- $215, 000. 00
    Completion during October 1934 of construction
      of 3.64 miles of levee and flood-way channel
      between Moore Haven and Fisheating Creek
      by U. S. pipe-line dredge Welatka and hired
      labor__________------------------------------------- 303,600. 00
    Completion during August 1934 of contract for
      construction of 19 temporary houses for sup-
      ervisory personnel at Clewiston-------------          47, 000. 00
    Completion during December 1934 of revetment
      of channel slopes in section 1 of division 1,
      by United States plant and hired labor_------         48, 000. 00
    Completion during June 1935 of revetment of
      channel slopes in section 3 of division 2, by
      United States plant and hired labor---------_         62, 000. 00
    Begin during August 1934 the construction of
      65,000 linear feet of levee and navigation
      channel between Bacom Point and Miami
      Canal, by United States plant and hired
      labor------------------------------------- 702, 865. 00
    Begin during January 1935 the revetment of
      channel slopes in section 2 of division 2, by
      United States plant and hired labor                   60, 800. 00
                                                            6-----_
    Begin during January 1935 the location survey
      and subsurface investigations of north shore
       levee __------------- _--_-----__---------                         16, 520. 86
       Total for new work                        ----   --- ----   ----       ----   -   1   455.7?85. 86
502     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                     1934

Maintenance:
   Complete during August 1934 extension to
      dredge by-pass at Lock No. 2, St. Lucie
      Canal, by United States plant and hired
      labor ----------------------------        ----   $11, 156. 00
    Complete during August 1934 repairs to Lock
      No. 2, St. Lucie Canal, by United States
      plant and hired labor---------------------         7, 000. 00
    Installing navigation aids, temporary .......    -   3, 000. 00
    Emergency dredging of shoals from navigable
      channels due to floods .__-________ .____-        46, 000. 00

      Total for maintenance______________-_______                        $67, 156. 00

      Total for all work                                               , 586, 785. 88
                                                                      1---------------------------------
  The balance unexpended July 1, 1934, from the allotment of
$4,200,000 made during September 1933, $2,861,881.58 and $3,700,000
made during July 1934 by the Public Works Administration, a total
of $6,561,881.58, will be applied as follows:
Accounts payable June 30, 1934___ ___________         ______ _         $200, 011. 79
New work:
    Completion during February 1935 of contract
     for construction of 3.7 miles of levee and
     navigation channel between Liberty Point
     and Clewiston__________________________        $234, 000. 00
    Completion during February 1935 of con-
     tract for construction of 5.53 miles of levee
     and navigation channel between Little Bare
     Beach and Miami Canal--------------              938, 400. 79
    Completion during February 1935 of contract
     for construction of 4.79 miles of levee and
     navigation channel between Clewiston and
     Little Bare Beach_________________----           590, 000. 00
    Completion during February 1935 of contract
      for construction of 4 hurricane gates___        640, 000. 00
    Completion during August 1934 of contract
      for the construction of 6 drainage culverts_     38, 000. 00
    Completion during May 1935 of auxiliary
      flood-way channel between Liberty Point
      and Rocky Reef by U. S. dipper dredge
      Mayaca -------------------------------           27, 000. 00
    Completion during February 1935 of the
      construction of levee and navigation chan-
      nel in section 1 of division 9 with U. S.
      pipe-line dredge Gulfport and attendant
      plant---------------------------------326,           469. 00
    Begin about September 1934, by contract, the
      construction of levee and navigation chan-
      nel in sections 2, 3, and 4 of division 9
      between Pahokee and St. Lucie Canal-..       1, 050, 000. 00
    Begin about September 1934, by contract, the
      construction of 6 drainage culverts in di-
      vision 9 and division 2 of south shore
     levee ----------------------------------         305, 750.00
    Begin during September 1934, by contract,
      the construction of Moore Haven Lock and
      hurricane gate structure_-----         -----    650, 000. 00
    Begin during October 1934, by contract, the
      construction of 17 drainage spillways
      along the St. Lucie Canal_--------------        391, 000. 00
          RIVERS AND HARBORS-JACKSONVILLE,                                               FLA., DISTRICT                   503

New work-Continued.
   Begin during October 1934, by contract, the
     dredging of the Caloosahatchee Canal and
     River between Moore Haven and Fort
     Thompson-----      -----------------------                                      $921, 250. 00,
   Begin during December 1934, by contract,
     the construction of 1 navigation lock on
     Caloosahatchee River near Ortona- -- __--                                         250, 000. 00
                                                                                                           $6, 361, 869. 79
        Total, all for new work----------------------------                                                6, 561, 881. 58
   The additional sum of $1,376,000 ($508,250 United States funds
and $867,750 to be contributed by local interests) can be profitably
expended during the fiscal year 1936 as follows:
New work: Begin about July 1, 1935, by contract, the dredging
  of the Caloosahatchee River between Fort Thompson and
Beautiful Island      -----------------------------------        $1, 321, 000. 00
Maintenance:
    Dredging with U. S. dredge Saraisota in chan-
      nel below Fort Myers, 33/4 months, July to
      October 1935, at $8,000 per month ---------    $30, 000. 00
    Dredging with U. S. dredge Sarasota in St.
      Lucie River between lock no. 2 and Stuart,
      31/8 months, October 1935-January 1936,
      at $8,000 per month__________- __-- -_          25, 000. 00

        Total for maintenance                       --------------------------------                              55, 000. 00
        Total for all work __.                       _________--__------1,                                       376, 000. 00
                                     Cost and financial summary
                          MAINTENANCE AND IMPROVEMENT                                FUNDS

Cost of new work to June 30, 19341 _________________________                                               $2, 538, 475. 06
Cost of maintenance to June 30, 1934                                ______----------                             335, 800. 85

      Total cost of permanent work to June 30, 1934--------                                                2, 874, 275. 91
Value of plant, materials, etc., on hand June 30, 1934_ .... __                                               402, 886. 94

      Net total cost to June 30, 1934__ .---                                                               3, 277, 162. 85
Plus accounts receivable June 30, 1934_ _______--____-___                                                      22, 935.97

      Gross total costs to June 30, 1934_.                                   -     -_________---3,
                                                                                               300, 098. 82
Minus accounts payable June 30, 1934__-..                                   _____--_----        63, 844. 02

     .Net total expenditures_____ ---------------          3, 236, 254. 80
Unexpended balance June 30, 1934------------------------1,    334, 055. 61

        Total amount appropriated to June 30, 1934 .-----__-                                            - 4, 570, 310. 41

   Fiscal year ending June 30                1930                  1931           1932              1933              1934


Cost of new work ----  __--__--           ___----     _ $119, 689. 66           $420, 927.73    $793, 869. 85     $1,057, 434. 70
Cost of maintenance------------           $33, 790. 38 ------------------------------                   ___           59, 564. 81

     Total cost--.-.   ...-------.-----------------------.....                                             _       1,116, 999. 51

Total expended----------------              33, 835. 71          112, 174. 79   396, 039. 75     762, 148. 65      1, 542, 720. 70
                           ----  20, 000. 00
Allotted ...............--------------...--..735, 000. 00                         7, 545. 87   1, 929, 225. 73     1, 473, 070. 81

  1Includes $399.53 credit plant adjustment.
504           REPORT     OF    CHIEF OF              ENGINEERS,                 U.      S.   ARMY,           1934

Balance unexpended July 1, 1933________________________                                                      $1, 403, 705. 50
Amount allotted from War Department Appro-
priation Act approved Apr. 26, 1934 ______ $1, 130, 500.                                          00
Amount allotted from War Department Appro-
priation Act approved July 14, 1932--------       20, 000'.                                       00
Amount allotted from War Department Appro-
priation Act approved May 28, 1930.___________     5, 000.                                        00
Amount allotted from War Department Appro-
priation Act approved Mar. 4, 1933_ ..... __   - 348, 9109.                                       22:
                                                                                                              1, 504, 409. 22

      Amount to be accounted for_________________________                                                     2, 908, 114. 72
Deductions on account of revocation of-
   Allotment -------------------------------     10, 000. 00
   Impounded funds ______________________        21, 338. 41
                                                                                                                   31, 338. 41

      Net amount to be accounted for_______________________                                                   2, 876, 776. 31
Gross amount expended______________________     1, 635, 582. 09,
Less reimbursements collected                       92, 861. 39
                                                                                                              1, 542, 720. 70

      Balance unexpended June 30, 1934_________________                                                       1, 334, 055. 61
Outstanding liabilities June 30, 1934-----------  60, 188. 18
Amount covered by uncompleted contracts -----    227, 110. 13
                                                                                                                  287, 298. 31
     Balance available June 30, 1934______________________                                                    1, 046, 757. 30
Accounts receivable June 30, 1934 ________________________                                                        22, 935. 97
        Unobligated balance available June 30, 1934------_----_                                               1, 069, 693. 27
Amount (estimated) required to be appropriated for completion
of existing project 1_______________    -                                                                        453, 250. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1936:
   For new work ---------                               __                                                        453, 250. 00
      For maintenance 1_____________________________________                                                       55, 000. 00

         Total 1-------------------------------------------                                                       508, 250. 00
                                            PUBLIC      WORKS FUNDS

Cost of new work to June 30, 1934_________________________                                                   $1, 533, 220. 02
Cost of maintenance to June 30, 1934__________________

      Total cost of permanent work to June 30, 1934_________                                                  1, 533, 220. 02
Value of plant, materials, etc., on hand June 30, 1934________                                                     4, 910. 19

     Net total cost to June 30, 1934                      538, 130. 21
                                                        1______________________
Minus accounts payable June 30, 1934 ____________________200, 011. 79
     Net total expenditures__________________________                                                         1 338, 118. 42
Unexpended balance June 30, 1934_______________________                                                       2, 861, 881. 58
        Total amount appropriated to June 30, 1934----------4, 200, 000. 00

   Fiscal year ending June 30               1930              1931                1932                1933             1934


Cost of new work ----------------..   ---                .         --                         --    -- -      $1, 533, 220. 02
                                  -
C ostof m aintenan ce - ----- -----         -------------..------- -----.---    ----.        .. ... .. ... ..... .. ... ..
                                                                                         ----.-...
Total expended     ---------------                                          -   -1,                                   338, 118. 42
Allotted .-               .       . -.-....
                                          ...            .     .        .       . - .        -.   .     -     -     4, 200, 000. 00

  1 Exclusive of available funds.
            RIVERS AND HARBORS-JACKSONVILLE,                                      FLA., DISTRICT                    505
Amount allotted from National Industrial Recovery Act ap-
  proved June 16, 1933 ----------------     ----------                                                $4, 200, 000. 00
Gross amount expended----------------------------------                                                1, 338, 118. 42

      Balance unexpended June 30, 1934___------------                                                  2, 861, 881. 58
Outstanding liabilities June 30, 1934 __    __-----      $13, 703. 00
Amount covered by uncompleted contracts _----         2, 734, 808. 78
                                                                                                       2, 748, 511. 78

          Balance available June 30, 1934 __--___________-------                                            113, 369. 80'
Amount allotted by Public Works Administration Emergency
Appropriation Act, fiscal year 193_------------------------                                           3, 700, 000. 00

          Balance available for fiscal year 1935_                   --        ---------                3, 813, 369. 80

       CONSOLIDATED COST AND           FINANCIAL      SUMMARY            FOR UNITED           STATES FUNDS

Cost of new work to June 30, 19341------------------------- ------$4, 071, 695. 08
Cost of maintenance to June 30, 1934----------- ---------------                                             335, 800. 85

      Total cost of permanent work to June 30, 1934------                                              4, 407, 495. 93
Value of plant, materials, etc., on hand June 30, 1934                       -----------                  407, 797. 13

      Net total cost to June 30, 1934___
                                     --------------------------                                        4, 815, 293. 06
Plus accounts receivable June 30, 1934 .----------------------                                             22, 935. 97

     Gross total costs to June 30, 1934--------------------                                            4, 838, 229. 03
Minus accounts payable June 30, 1934_----------------------                                               263, 855. 81

          Net total expenditures                                             ------             _-- 4, 574, 373.22
Unexpended balance June 30, 1934----------------------------                                           4, 195, 937. 19
          Total amount appropriated to June 30 1934--------------                                       , 770, 310. 41

   Fiscal year ending June 30           1930            1931               1932                1933              1934


Cost of new work         ----------------
                          -__                        $119, 689. 66 $420, 927. 73          $793, 869.85       $2, 590, 654. 72
Cost of maintenance                             38 -------------------
                                      $33, 790.-----------------
                                                       ,                                                          59, 564. 81
        Total cost.---    _            33, 790. 38   119, 689. 66        420, 927. 73       793, 869. 85      2, 650, 219. 53
Total expended----------------         33, 835. 71   112, 174. 79        396, 039. 75       762, 148. 65      2, 880, 839. 12
Allotted__________ ______________      20, 000. 00   735, 000. 00          7, 545. 87     1, 929, 225. 73     5, 673, 070. 81



Balance unexpended July 1, 1933__
                                -----------------------------                                         $1, 403, 705. 50
Amount allotted from War Department Appro-
  priation Act approved Apr. 26, 1934.-...---          $1, 130, 500. 00
Amount allotted from War Department Appro-
  priation Act approved July 14, 1932 - --.....             20, 000. 00
Amount allotted from War Department Appro-
  priation Act approved May 28, 1930 ...          -__-       5, 000. 00
Amount allotted from War Department Appro-
  priation Act approved Mar. 4, 1933 .        ---....      348, 909. 22
Amount allotted from National Industrial Re-
  covery Act approved June 16, 1933_-           -       4, 200, 000. 00
                                                                                                        5, 704, 409. 22
          Amount to be accounted for---------------------------                                         7, 108,114. 72
   1   Includes $399.53 credit plant adjustment.
506         REPORT OF CHIEF OF ENGINEERS,                                  U.    S. ARMY,            1934

Deductions on account of revocation of-
    Allotment                                                                   $10, 000. 00
   Impounded funds -                                                             21, 338. 41
                                                                                                         $31, 338.41
      Net amount to be accounted for----------------------7,                                             076, 776. 31
Gross amount expended--      ------------------ 2, 973,700. 51
Less reimbursements collected -----------------             92, 861. 39
                                                                                                      2, 880, 839. 12

      Balance unexpended June 30, 1934-------------------                                             4, 195,937. 19
Outstanding liabilities June 30, 1934-----------     73, 891. 18
Amount covered by uncompleted contracts----      2, 961, 918. 91
                                                                                                      3, 035, 810. 09
     Balance available June 30, 1934---------------------                                             1, 160, 127. 10
Accounts receivable June 30, 1934       --------                                                          22, 935. 97
     Unobligated balance available June 30, 1934------------1, 183, 063. 07
Amount allotted by Public Works Administration Emergency
Appropriation Act, fiscal year 1935--------------------     3, 700, 000. 00
         Balance available for fiscal year 1935 -----------------                                     4, 883, 063. 07
Amount (estimated) required to be appropriated for completion
   of existing project 1--------------                                                                   453, 250. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1936:
   For new work 1- - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - -        -
                                                                                                         453, 250. 00
     For maintenance 1----------------                                                                    55, 000. 00
                 - -- -   - - - - - -   - -- -- - - -- -- - -- - -- - - -- -- - -- - -- - -- - -
         Total                                                                                           508, 250. 00
                                             CONTRIBUTED           FUNDS


Cost (of new work to June 30, 1934_________________________ _                                            220, 205. 70
Cost cof maintenance to June 30, 1934_____________________

        Total cost of permanent work to June 30, 1934__________                                          220, 205. 70
Net t otal, expenditures----------------------------------                                               220, 205. 70
Unexi )ended balance June 30, 1934___                                                                    229, 794. 30
        Total amount contributed to June 30, 1934___________                                             450, 000. 00

   Fiscal year ending June 30              1930             1931             1932           1933              1934


Cost of new work...--------------------------$9, 047. 70                 $157, 924. 05    $52, 640. 39          $593. 56
Cost of maintenance....       ..--- --------------     -------------...--.......................................
Total expended_--- ----                 -__---
                                            -_______      - 9, 047. 70     157, 924. 05    52, 640. 39           593. 56
Contributed    -----------------------------              200, 000. 00      96, 772. 31    25, 000. 00       128, 227. 69



Balance unexpended July 1, 1933_____-         -___ -_______-__-$102, 160. 17
Amount contributed under authority act approved July 3, 1930-   128, 227. 69
         Amount to be accounted for--------------------------                                            230, 387. 86

   1Exclusive of available funds.
           RIVERS AND HARBORS-JACKSONVILLE,                                          FLA.,    DISTRICT               507
Gross amount expended                         __ $98, 708. 59
Less reimbursements collected------------------- 98, 115. 03
                                                                                                                 $593. 56
        Balance unexpended June 30, 1934--------------------                                                 229, 794. 30

Amount (estimated) required to be contributed for completion
of existing project 1 2- - - - - - - - - - - - - - - - - - - - - - - - -
                                                                                                        2, 445, 750. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1936, for new work 1-------------                                                                  867, 750. 00

CONSOLIDATED COST AND FINANCIAL SUMMARY FOR CALOOSAHATCHEE RIVER AND LAKE
                      OKE'ECHOBEE DRAINAGE AREAS, FLA.

Cost of new work to June 30, 1934 --------                                                            $4, 291, 900. 78
Cost of maintenance to June 30, 1934___ __________-----------                                                335, 800. 85

      Total cost of permanent work to June 30, 1934-        --                                          4, 627, 701. 63
Value of plant, materials, etc., on hand June 30, 1934---------                                            407, 797. 13

      Net total cost to June 30, 1934 -------------------------                                         5, 035, 498. 76
Plus accounts receivable June 30, 1934-----------------------                                               22, 935. 97

      Gross total costs to June 30, 1934----------------------                                         5, 058, 434. 73
Minus accounts payable June 30, 1934------------------------                                              263, 855. 81

     Net total expenditures -------------------------------                                             4, 794, 578. 92
Unexpended balance June 30, 1934---------------------------                                             4, 425, 731. 49

         Total amount appropriated and contributed to June 30,
          1934-----------------------------------------------                                          9, 220, 310. 41

   Fiscal year ending June 30                   1930           1931           1932             1933                1934


Cost of new work __- ....
                     __   .            ..
                              . _________-.-. _ $128, 737. 36     $578, 851. 78 $846, 510. 24                 $2, 591, 248. 28
Cost of maintenance------------$33, 790. 38 ........-------- -----------------------------
                                                                         ....                                      59, 564. 81
      Total cost-- ........--------.--------      __---------------           ----.------------                2, 650, 813. 09
Total expended_ ----------------               33, 835. 71   121, 222. 49   553, 963.80      814, 789. 04      2, 881, 432. 68
Allotted and contributed........               20, 000. 00   935, 000. 00   104, 318. 18   1, 954, 225. 73     5, 801, 298. 50


Balance unexpended July 1, 1933_                                                                      $1, 505, 865. 67
Amount allotted from War Department Appro-
priation Act approved April 26, 1934________ $1,130, 500. 00
Amount allotted from War Department Appro-
priation Act approved July 14, 1932___- ___-     20, 000. 00
Amount allotted from War Department Appro-
priation Act approved May 28, 1930 _______        5, 000. 00
Amount allotted from War Department Appro-
priation Act approved March 4, 1933----------   348, 909. 22
Amount allotted from National Industrial Re-
covery Act approved June 16, 1933----------- 4, 200, 000. 00
Amount contributed under authority act ap-
proved July 3, 1930-------------------          128, 227. 69
                                                                                                        5 .832 63.        91

         Amount to be accounted for__________________-_____                                             7, 338, 502. 58
   1 Exclusive of available funds.
   2 Includes $895,750 reimbursable by local interests for construction of drainage culverts.
   SIncludes $399.53 credit plant adjustment.
508       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                             1934

Deductions on account of revocation of-
      Allotment _-_         _-__-__-__-                                                  $10, 000. 0 0
      Impounded funds______                                                                21, 338. 411
                                                                                                                   $31, 338. 41
      Net amount to be accounted for ___        _________                                                       7, 307, 164. 17
Gross amount expended___-----------------------    3, 072, 409. 10
Less reimbursements collected____ ______--___-
                                     -190,                 976. 42
                                                                                                                2, 881, 432. 68

    Balance unexpended June 30, 1934_______________________                                                     4, 425, 731. 49
Outstanding liabilities June 30, 1934______ ____     73, 891. 18
Amount covered by uncompleted contracts_ ....    2, 961', 918. 91
                                                                                                                3, 035, 810. 09

       Balance available June 30, 1934_-......                                                                  1, 389, 921. 40
Accounts receivable June 30, 1934 _         --------                                                      _         22, 935. 97

     Unobligated balance available June 30, 1934-------------                                                   1, 412, 857. 37
Amount allotted by Public Works Administration Emergency
Appropriation Act fiscal year 1935_                          -------------------------                         3, 700, 000. 00

       Balance available for fiscal year 1935_________________                                                  5, 112, 857, 37
Amount (estimated) required to be appropriated and contrib-
  uted for completion of existing project                            12--_----                                  2, 899, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1936 :
    For    new      work 1----------------                                                                      1, 321, 000. 00
                       -
    For maintenance 1 ______________ __________                                                                     55, 000. 00
               1- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
       Total                                                                                                     1, 376, 000. 00
                                 14. CHARLOTTE HARBOR,                                   FLA.

  Location.-This harbor is a large bay on the west coast of Florida.
The entrance is 70 miles south of the entrance to Tampa Bay and
150 miles north of Key West. (See U. S. Coast and Geodetic Survey
Charts Nos. 474 and 1255.)
  Previous projects.-Appropriations for removing obstructions
were made in 1881, 1882, and 1886. Improvement of Charlotte Har-
bor and Peace Creek was authorized by acts of September 19, 1890,
and June 13, 1902. The cost and expenditure were $119,000, all for
new work. For further details see page 152 of Annual Report for
1890, page 1828 of Annual Report for 1915, and page 291 of Annual
Report for 1904.
  Existing project.-This provides for dredging a channel 27 feet
deep at mean low water and 300 feet wide, increased to 500 feet wide
at the bend, from the Gulf of Mexico to South Boca Grande, just
inside the entrance, thence 10 feet deep and 100 feet wide from deep
water at Boca Grande to the end of the municipal terminal at Maud
Street, Punta Gorda, with a turning basin 200 feet square at the
outer end of the terminal. The mean range of tide is 1.2 feet at
South Boca Grande and 1.4 feet at Punta Gorda. The extreme range
is about 2 feet. Strong southwesterly winds raise the water level
about 1/2 feet. Strong northerly and easterly winds lower the water
level about 1 foot.
   The estimate of cost for new work, revised in 1930, exclusive of
amount expended on previous projects, was $108,500. The latest
  1 Exclusive of available -funds.
  2 Includes $895,750 reimbursable by local interests for construction of drainage culverts.
            RIVERS AND IIARBORS-JACKSONVILLE,                                        FLA.) DISTRICT              509
 (1930) approved estimate of cost for annual maintenance is $29,000.
   The existing project was authorized by the following river and
harbor acts: The act of July 25, 1912 (H. Doc. No. 699, 62d Cong.,
2d sess.),, provided for a depth of 24 feet at the entrance; the act of
March 3, 1925 (H. Doc. No. 113, 66th Cong., 1st sess.), provided for
the 27-foot depth at the entrance; and the act of July 3, 1930 (Rivers
and Harbors Committee Doc. No. 1, 70th Cong., 1st sess.), provided
for the 10-foot depth to Punta Gorda. The latest published maps
are in the project documents and House Document No. 657, Sixty-
eighth Congress, second session.
   Local cooperation.-Fully complied with.
   Terminal facilities.-These consist of a phosphate wharf at South
Boca Grande and a municipal earth-fill pier in steel-sheet piling
 (completed in 1929) about 850 feet long at Punta Gorda. The
facilities are adequate for the needs of the present commerce. Both
wharves are open to the public. (For further details see Port Series
No. 8, Corps of Engineers.)
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.--The existing project was com-
pleted in 1931 at a saving of $15,968 under the estimated cost.
The controlling depths in the channel are 27 feet for a width of
200 feet from the Gulf of Mexico through the bar to South Boca
Grande, ascertained in March 1934, thence 9.5 feet for a width of
100 feet to Punta Gorda, ascertained in May 1933. The total costs
and expenditures have been $366,636.40, of which $92,531.80 was
for new work and $274,104.60 was for maintenance. In addition,
$15,562.78 was expended for new work from funds contributed by
local interests.
   Proposed operations.-The balance unexpended July 1, 1934
 ($58,000) will be applied to maintenance dredging with U. S. hopper
dredge Manhattan, 21/2 months, February-April 1935, removing
shoals from the bar cut as required.
   No funds can be profitably expended for maintenance during
the fiscal year ending June 30, 1936, as the work contemplated
during the fiscal year 1935 is expected to meet the needs of commerce
during this period.
                                      Cost and financial summntary

Cost of new work to June 30, 1934_______________
                                     --                                                                 $211, 531. 80
Cost of maintenance to June 30, 1934__ _______---------                                                  274, 104. 60

           Total cost of permanent work to June 30, 1934 ________                                       485, 636. 40

Net total expenditures _______-___________________                                                       485, 636.40
Unexpended balance June 30, 1934______----------------------                                              58, 000. 00

           Total amount appropriated to June 30, 1934_________-_                                        543. 636. 40

   Fiscal year ending June 30             1930         1931                1932              1933            1934


Cost of new work---------------------------          $6, 477. 54    -.--------------------
Cost of maintenance           ..-------- -- --- --------------         $29,996.80
Total expended ------------             $1, 952. 64    6, 411. 29         39, 172. 32        ---

Allotted    _------- --------------     -7, 000. 00   29, 000. 00         16, 000. 00        -$98. 14       $58, 000. 00
510     REPORT   OF CHIEF OF     ENGINEERS,    U.   S.   ARMY,   19 3 4

Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934-------------------------------------------------    $58, 000
Balance unexpended June 30, 1934---------------------------------- 58, 000
                        15. SARASOTA BAY, FLA.

   Locatior.-This is a shallow sound on the west coast of the penin-
sula of Florida, separated from the Gulf of Mexico by a chain of low
sand keys. At its northern end it connects with the southern ex-
tremity of Tampa Bay. (See U. S. Coast and Geodetic Survey
Chart No. 1256.)
   Previous projects.-Adopted by acts of September 19, 1890, June
3, 1896, and March 2, 1907. The cost and expenditures on these
projects were $125,000.50, of which $75,854.45 was for new work and
$49,146.05 for maintenance. For further details see page 776 of
Annual Report for 1918.
   Existing project.-This provides for a channel 100 feet wide and
7 feet deep at mean low water from Tampa Bay through Sarasota
Bay to Sarasota by way of Bulkhead Cut and Cortez Cut, to Long-
boat Inlet, and thence through Long Key Cut, and thence 75 feet
wide and 3 feet deep at mean low water through Little Sarasota
Bay to Venice, by dredging through shoals. The length of the sec-
tion covered by the project is 38 miles. The mean tidal range is
1.5 feet. The extreme range is 2 feet. Strong southwesterly winds
raise the water level about 1 foot. Strong northerly winds lower
the water level about 1.5 feet. Northerly winds prevail during the
winter months and southerly winds during the summer months.
The water level is usually lower in the winter than at other times.
The estimate of cost for new work, revised in 1925, is $193,500, ex-
clusive of amounts expended on previous projects. The latest (1928)
approved estimate for annual cost of maintenance is $10,000. The
existing project was adopted by the River and Harbor Act of March
2, 1919 (H. Doc. No. 844, 63d Cong., 2d sess.). The latest published
map is in the project document.
   Terminal facilities.-Consist of 1 municipal concrete pier, 1 rail-
way pier; 1 freight wharf, and 10 privately owned boat landings.
The municipal pier and the freight wharf are open to the public;
the railway pier is used mainly for storing private Pullman cars
and occasionally for transshipment of lumber and building material
to nearby keys. A marginal dock, 500 feet long, has been constructed
along the terminal island. The facilities are adequate for the present
needs.
   Operations and results during fiscal year.--Under a contract for
maintenance dredging in Little Sarasota Bay at Dona Bay, 6,085
cubic yards of sand and shell were removed from 475 linear feet
of channel. The work was done from September 8 to 18, 1933,
and resulted in obtaining project dimensions with 3 feet overdepth
in the area dredged. The cost was $1,853.32.
   Maintenance dredging with leased pipe-line dredge Alsati was in
progress in Sarasota Bay from April 14 to 28, 1934. A total of
20,966 cubic yards of sand, shell, and mud were removed from 1,190
linear feet of channel at Cortez and Longbeach Cuts. The average
depth obtained over the area dredged was 10 feet. The cost was
$3,586.06.
            RIVERS AND HARBORS-JACKSONVILLE,                                            FLA.,      DISTRICT           511

   The total cost for the fiscal year was $5,439.38, all for maintenance.
The total expenditures were $358.41.
   Condition at end of fiscal year.-The project is about 86 percent
completed. In Little Sarasota Bay channels 4 feet deep and from
50 to 75 feet wide have been dredged. The controlling depths at
mean low water were 7 feet from Tampa Bay to Sarasota, taken in
April 1934, and thence 3 feet to Venice, taken in September 1933.
The work remaining to be done to complete the project is the widen-
ing of the channel in Little Sarasota Bay, involving rock removal
principally at Mangrove Cut. The total cost and expenditures have
been $205,263.38, of which $139,686.46 was for new work and $65,-
576.92 was for maintenance.
   Proposed operations.-No funds are available.
   No funds c'an be profitably expended for new work or maintenance
during the fiscal year 1936 for the reason that the completion of
the project involves rock excavation at a cost not justified by the
limited commerce and that the maintenance work done during the
fiscal year 1934 is expected to meet the requirements of commerce
during the period.
                                        Cost and financial summary

Cost of new work to June 30, 1934-----------------------------                                               $215, 540. 91
Cost of maintenance to June 30, 1934 1--------------------------                                              114,. 722. 97

      Total cost of permanent work to June 30, 1934---------- 330, 263. 88
Net total expenditures_ -----------------------------------   330, 263. 88
Total amount appropriated to June 30, 1934------------------- 330, 263. 88

          Fiscal year ending June 30                      1930          1931             1932         1933          1934


Cost of new work....--                                               --------------------------------------
Cost of maintenance----------..................--.    $23, 204.07     $6, 794. 45   ------------    $7, 213. 36    $5, 439. 38

Total expended_._----------------------                13, 478. 38   -5, 110. 01 -$20, 219. 75     -4, 573. 12        358. 41

Allotted___-----------------                            7, 000.00 _-------35,
                                                     -------------                                     030. 04    -5, 206. 08


Balance unexpended July 1, 1933-----------------------------$5, 564. 49
Deductions on account of revocation of-
    Allotment-------------------------          ---- $5, 174. 64
    Impounded funds---------------------------------      31.44
                                                                 5, 206. 08

Net amount to be accounted for ---------------------------------                                                   358. 41
Gross amount expended-----------------------------5,        681.92
Less reimbursements collected------------------------    5, 323. 51
                                                                                                                   358. 41

Amount (estimated) required to be appropriated for completion of
existing project 2- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 53, 800. 00

                                       16. TAMPA HARBOR, FLA.

  Location.--This harbor is a large natural indentation of the Gulf
of Mexico approximately midway of the western coast of the Penin-
sula of Florida. The entrance is about 220 miles north of Key West,
about 330 miles from Pensacola, 360 miles from Mobile, and 512
   1 Includes $168.98 credit plant adjustments.
   5Exclusive of available funds.
          91536---ENG 1934-33
512    REPORT OF CHIEF OF ENGINEERS,        U.   S.   ARMY,   1934


miles from New Orleans. (See U. S. Coast and Geodetic Survey
Charts Nos. 586 and 587.)
   Previous projects.-For Tampa Bay: Adopted by acts of June 14,
1880, and August 11, 1888. The amount expended on these projects
was $130,000 for new work.
    For Tampa and Hillsboro Bays: Adopted by acts of June 14, 1880,
March 3, 1899, and March 3, 1905. The amount expended on these
projects was $740,157.70, of which $723,050.46 was for new work and
$17,107.24 was for maintenance. In addition, $80,000 was spent for
new work in Hillsboro Bay, which was appropriated under the head
of Tampa: Bay, and is included in the expenditure reported under
that head. The total expenditure above reported includes $96,832.91
expended in Hillsboro River under the project of March 3, 1899.
   For Hillsboro River: Adopted by act of June 14, 1880.
   For further details see pages 1829, 1830, and 1831 of the Annual
Report for 1915.
   Existing project.-This provides for a depth of 29 feet at mean
low water on Egmont Bar, thence 27 feet deep to and in the several
channels of Tampa, Harbor, with widths of 500 feet on the bar, 300,
feet in Tampa Bay, Ybor Channel (formerly Ybor Estuary), and
Garrison Channel (formerly Hendry and Knight Channel), and
Sparkman Channel (formerly Tampa Northern and Sparkman Bay
Channels), and 200 feet in Hillsboro Channel and Seddon Channel
 (formerly Seddon Island Channel), with turning basins at the mouth
of Hillsboro River and at the entrance to Ybor Channel; for securing
and maintaining by dredging a channel 2,400 feet long and 200 feet
wide and 12 feet deep. at mean low water in Hillsboro River from a
point 100 feet south of the Lafayette Street Bridge to the turning
basin at the mouth of the river. The channel connecting Port Tampa
with the channel from the Gulf of Mexico to Tampa is to, be 26 feet
deep with sufficient width.
    The mean range of tide is 1.3 feet at the lower end of the bay, 1.6
feet at Port Tampa, and 1.8 feet at Tampa. The extreme range is
1.6 feet at the lower end of the bay and 2.3 feet at Tampa and Port
Tampa. Strong southwesterly winds raise the water level about 1.5
feet. Strong northerly winds, which usually occur in the winter
months, lower the water level about 2 feet.
    The estimated cost for new work (revised in 1930) is $4,944,300,
exclusive of amounts expended on previous projects. The latest
 (1930) approved estimate of cost for annual maintenance is $75,000.
    The existing consolidated project is derived from the following
detailed projects existing on the date of consolidation, viz :
    For Tampa Bay, project was adopted by the River and Harbor Act
of March 3, 1899 (H. Doc. No. 52, 55th Cong., 3d sess.), and modified
by the River and Harbor Act of March 3, 1905, which fixed the dimen-
sions of the channel as 26 feet deep with sufficient width. The latest
published map is in House Document No. 88, Fifty-fifth Congress,.
first session.
    For Tampa and Hillsboro Bays, project was authorized by the fol-
lowing river and harbor acts: The act of June 25, 1910, provided for
channel 24 feet deep in Hillsboro Bay (H. Doc. No. 634, 61st Cong.,,
2d sess.); the act of August 8, 1917, provided for the 27-foot depth
from the Gulf of Mexico up to and in the several channels of Hills-
           RIVERS   AND   IIARBORS-JACKSONVILLE,   FLA.,   DISTRICT   513

boro Bay (H. Doc. No. 1345, 64th Cong., 1st sess.). The latest pub-
lished maps are in House Document No. 634, Sixty-first Congress,
second session; Annual Report for 1914, page 2130; House Docu-
ment No. 1345, Sixty-fourth Congress, first session, and Senate
Document No. 22, Seventy-second Congress, first session.
   For Hillsboro River, project was adopted by the River and Harbor
Act of March 3, 1899, under the title of " Improving Hillsboro Bay,
Fla." (H. Doc. No. 545, 55th Cong., 2d sess.). The latest published
maps are in House Document No. 132, Sixty-third Congress, first
session.
   The River and Harbor Act of September 22, 1922, authorized the
consolidation of the above projects to form a single project for
Tampa Harbor. The River and Harbor Act of July 3, 1930, pro-
vided for increasing the depth of Egmont Channel to 29 feet and
the width of Sparkman Channel to 300 feet (H. Doc. No. 100, 70th
Cong., 1st sess.), which document contains the latest published map
of these localities.
   Supplementing the work authorized by Congress, the deepening
to 30 feet of Hillsboro and Port Tampa Channels, as recommended
by the Chief of Engineers in Senate Document No. 22, Seventy-
second Congress, first session, was included in the Public Works
program under the National Industrial Recovery Act.
   Recommended modifications of project.-Under date of December
7, 1927, the Chief of Engineers recommended modification of the
existing project so as to provide for a width of 300 feet in Hillsboro
Channel at an estimated cost of $351,560 (H. Doc. No. 100, 70th
Cong., 1st sess.).
   Under date of December 8, 1931, the Chief of Engineers recom-
mended modification of the existing project so as to provide for a
depth of 32 feet and a width of 600 feet on Egmont Bar; a depth of
30 feet and a width of 400 feet in Mullet Key cut; a depth of 30 feet
and a width of 300 feet in all other project channels in Tampa
Harbor, except in Hillsboro River; a turning basin 30 feet deep,
2,000 feet long, and 550 feet in maximum width at the entrance to
the Port Tampa terminals; at an estimated cost of $3,675,000, with
$125,000 annually for maintenance, subject to certain conditions of
local cooperation (S. Doe. No. 22, 72d Cong., 1st sess.). (Deepening
30-foot channels included under Public Works program.)
   Local cooperation.-Fully complied with.
   Terminal facilities.-At Tampa these consist of 34 piers and
wharves with depths of from 5 to 27 feet. All but eight are open
to the public on payment of wharfage charges.
   At Port Tampa these consist of seven wharves with depths of 14
to 27 feet.
   On the east shore of Hillsboro Bay there are two large phosphate
plants, each providing about 1,000 feet of berthing space with pri-
vately dredged channels 23 and 27 feet deep connecting with the
Hillsboro Channel of the Tampa Harbor project. (For further
details see Port Series No. 8, Corps of Engineers.)
                OPERATIONS AND RESULTS DURING FISCAL YEAR


  Regular funds.-Dredging under contract to widen Sparkman
Channel to 300 feet continued throughout the fiscal year. Project
514    REPORT OF CHIEF OF ENGINEERS,         U.   S.   ARMY,   1934

dimensions were secured for a distance of approximately 3,800 linear
feet and 300,503 cubic yards of material were removed at a cost of
$91,594.89 for new work.
    Maintenance dredging with the U. S. hopper dredge Absecon, in
progress at the beginning of the fiscal year, continued until August
8, was resumed on August 27, and was in progress until November 5,
1933. There were removed 186,440 cubic yards of material from
cuts G and J, Tampa Bay Channel, 217,499 cubic yards from Garri-
son Channel, and 85,470 cubic yards from cut B, Hillsboro Channel,
a total of 489,409 cubic yards (bin measurement). The cost was
$40,322.08.
    Under authority of section 3 of River and Harbor Act approved
July 3, 1930, the removal of a shoal in Hillsboro River above the
project section was done under contract from March 19 to 23, 1934.
There were removed 7,182 cubic yards of material from 900 linear
feet of channel at a cost of $995.95 for maintenance.
    General precontract surveys were made for dredging under the
30-foot project in Egmont Channel, Tampa Bay Channel, Port
Tampa Channel, and in the various channels of upper Tampa Har-
bor at a cost of $41,681.88 for new work. The wharves and bulk-
heads at the United States Engineer Department dredge-depot
reservation were repaired with hired labor. Surveys and inspections
incidental to the supervision of the project were made as required at
a cost of $2,156.70 for maintenance.
    Public Works funds.-The deepening to 30 feet of the Hillsboro
and Port Tampa Channels and the construction of a turning basin
at Port Tampa were begun under contract on November 14, 1933, and
were in progress at the close of the fiscal year. Project dimensions
were secured for a total distance of 31,100 linear feet of channel, in-
cluding the 500 by 2,000 feet turning basin at Port Tampa.
There were removed 2,750,174 cubic yards of material from Hills-
boro Channel and 211,517 cubic yards from Port Tampa Channel, a
total of 2,961,691 cubic yards. The cost was $386,281.81 for new
work.
    Under regular funds, the cost during the fiscal year, including
$995.95 expended for the removal of a shoal in Hillsboro River, was
$133,276.77 for new work and $43,474.73 for maintenance, a total of
$176,751.50; the expenditures were $153,514.47. Under Public
Works funds, the total cost was $386,281.81 for new work and the
expenditures $324,784. The grand total cost under all funds was
$563,033.31, of which $519,558.58 was for new work and $43,474.73
was for maintenance; the expenditures were $478,298.47.
    Condition at end of fiscal year.-The existing project is about 99
percent completed. The Hillsboro River project was completed in
1905: The 27-foot project has been completed with the exception of
the widening of Sparkman Channel, which is now in progress under
contract.
    The deepening of Hillsboro and Port Tampa Channels to 30 feet
with funds provided by the Public Works Administration is about
49 percent completed.
    The present controlling depths at mean low water are: Egmont
Channel at the entrance to Tampa Bay, 30 feet for a width of 500
         RIVERS AND HARBORS-JACKSONVILLE,                         FLA., DISTRICT     515
feet; Tampa Bay Channel, 27 feet for a width of 250 feet; Hillsboro
Channel, 26 feet for a width of 150 feet; Sparkman Channel, 24 feet
for a width of 200 feet; Ybor Channel, 26.5 feet for a width of 250
feet; Garrison Channel, 26 feet for a width of 250 feet; Seddon
Channel, 26 feet for a width of 200 feet; Port Tampa Channel, 27
feet for a width of 200 feet; and 10 feet in Hillsboro River.
  Under regular funds the cost of the existing project has been
$4,914,011.86 for new work and $1,138,422.12 for maintenance, a total
of $6,052,433.98; the expenditures have been $6,207,716.16. Under
Public Works funds, the total cost has been $3'86,281.81 for new work
and the expenditures $324,784.00.              The grand total cost under all
funds has been $6,438,715.79, of which $5,300,293.67 was for new work
and $1,138,422.12 was for maintenance. The total expenditures have
been $6,532,500.16.
  Proposed operations.-The balance unexpended and accounts re-
ceivable July 1, 1934 ($142,628.30), will be applied as follows:
Accounts payable June 30, 1934__-------------------------------_           _ $26, 700. 52
New work: Completion about Oct. 31, 1934, of contract
  for widening of Sparkman Channel 100 feet on the
  westerly side ---     ---------------------------              $26, 589. 28
Maintenance: Dredging with U. S. hopper dredge
  Absecon, 5 months, February-June 1935, removing
  shoals in the upper harbor_---__      _-__     _-__--89,            338. 50
                                                                              115, 927. 78

       Total for all work__                                             __    142, 628. 30
  The balance unexpended July 1, 1934, from funds allotted by the
Public Works Administration, including an allotment of $500,000
made during July 1934, will be applied as follows:
Accounts payable June 30, 1934_ .. ____     ______   __---      __-_ $61, 497. 81
New work:
    Complete during October 1934, under contract, the
      dredging required to widen and deepen Hillsboro
      and Port Tampa Channels to a depth of 30 feet,
      including the construction of a turning basin at
      Port Tampa- -- ___--------_____-___-            _ $341, 218. 19
    Begin about Nov. 1, 1934, under contining con-
      tract, the dredging required to deepen to 30 feet
      cuts A to F, inclusive, in Tampa Bay----------     270, 000. 00
    Prosecute during period Sept. 1, 1934, to May 1935,
      with United States hopper dredge, the dredging
      required in Egmont Channel to straighten, widen
      to 600 feet, and deepen to 32 feet       -----------
                                                         230, 000. 00
                                                                      841, 218. 19

         Total for all work________________              _--__-          __ _ 902, 716. 00
  The additional sum of $1,692,000 can be profitably expended dur-
ing the fiscal year 1936, to be applied to the completion of the project
adopted by the Public Works Administration and to maintenance, as
follows:
New work :
   Complete during November 1935 continuing contract for the
     dredging required to deepen to 30 feet cuts A to F, inclusive,
    in Tampa Bay                                     _____
                        --------------------------------------                  $250, 000
   Begin about Sept. 1, 1935, and complete during May 1936, under
       contract, the dredging required to deepen the channels of
       upper Tampa Harbor to 30 feet____ ____________________    1, 250, 000
516             REPORT OF CHIEF OF ENGINEERS,                                     U. S. ARMY,                1934

New work-Continued.
   Dredging with United States hopper dredge in Egmont Channel,
     2 months, January-February 1936, to complete the dredging
     required to straighten, widen to 600 feet, and deepen to 32
     feet___    ______-__                                                                                               $50,000
   Dredging with United States hopper dredge in Mullet Key Cut,
     2 months, March-April 1936, to secure a depth of 30 feet                                          ------             50, 000

        Total for new work __________________________________1, 600, 000
Maintenance: Dredging with U. S. hopper dredge Absecon, 6 months,
December 1935 to May 1936, removing shoals throughout the proj-
ect as required ---------------------------                      92, 000

           Total for all work                                                                                            692, 000
                                                                                                                      1-----------------------------

                                          Cost and financial summary
                                      MAINTENANCE        AND       IMPROVEMENT           FUNDS

Cost of new work to June 30, 1934---------------------------$5, 767, 062. 32
Cost of maintenance to June 30, 1934 -------------------------- , 155, 529. 36

      Total cost of permanent work to June 30, 1934                                     -----------           6, 922, 591. 68
Value of plant, materials, etc., on hand June 30, 1934                                  -----------              168, 042. 85

      Net total cost to June 30, 1934_-                                                                        7, 090, 634. 53
Plus accounts receivable June 30, 1934 _____________-____                                                          13, 939. 85

            Gross total cost to June 30, 1934 .                                   -__                         7, 104, 574. 38
Minus accounts payable June 30, 1934___-----------------------                                                        26,700. 52

                          ------
     Net total expenditures_                                                                                   7, 077, 873. 86
Unexpended balance June 30, 1934_--                                                                               128, 688. 45
           Total amount appropriated to Julle 30, 1934-------------                                            7, 206, 562. 31

            Fiscal year ending June 30                      1930          1931              1932           1933            1934


Cost ofnew work_____________ ___                        __$95,              986.68       $7, 602. 68 $128,768.52 $133, 276. 77
Cost of maintenance-- - ---..------                 _   $83, 708. 67   106, 656. 39     113, 259. 89   56, 750. 55 43, 474. 73

        Total cost....----------------------             83, 708. 67   202, 643. 07     120, 862. 57   185, 519. 07      176, 751. 50

Totalexpended                ------         -----        94, 945. 26: 183, 053. 57       88, 369. 28   127, 655. 70      153, 514. 47
Allotted------------------------                        101, 000. 00   198, 440. 00      16, 000. 00   285, 787. 68       62, 263, 08


Balance unexpended July 1, 1933_ __-                                   ________--_-------_---                     $219, 939. 84
Amount allotted from War Department Appropriaton
Act approved Apr. 26, 1934_____ __________-
                                       -       -  $30, 000. 00
Amount allotted from War Department Appropriation
    Act approved July 14, 1932_----------------------                                      42, 236. 09
                                                                                                                      72, 236.09

      Amount to be accounted for_______________-_-___----                                                          292, 175. 93
Deductions on account of-
    Revocation of allotment_ __       ___-____            4, 302. 32
    Impounded funds-----------------------------          5, 670. 69
                                                                                                                       9, 973. 01

      Net amount to be accounted for ______________________                                                        282, 202. 92
Gross amount expended------------------------        304, 719. 15
Less reimbursements collected --------- $151, 038.20
Less receipts from sales--------                                            166. 48
                                                                         ------           151, 204. 68
                                                                                             --                    153, 514. 47

             Balance unexpended June 30, 1934__ ______-------
                                                           ____                                        __          128, 688. 45
             RIVERS AND HARBORS-JACKSONVILLE,                                                   FLA., DISTRICT                       517
Outstanding liabilities June 30, 1934______________ $19, 155.62
Amount covered by uncompleted contracts--------- 43, 862. 82
                                                                                                                          $63, 018. 44

      Balance available June 30, 1934__                                                                                         670. 01
                                                                                                                            6_____________---65,
Accounts receivable June 30, 1934_ ____ __                                                ___                               13, 939. 85

           Unobligated balance available June 30, 1934__
                                                       ----------                                                           79, 609. 86

Amount that can be profitably expended in fiscal year ending
June 30, 1936, for maintenance 1________________________                                                                   92, 000. 00
                                                   PUBLIO WORKS FUNDS

Cost of new work to June 30, 1934__-----------                                      __      ----                -___$386, 281. 81
Cost of maintenance to June 30, 1934
      Total cost of permanent work to June 30, 1934----------                                                              386, 281. 81
1Minus accounts payable June 30, 1934_________________ _                                                                    61, 497. 81
     Net total expenditures_ -- __---             --
                                        -- __ ______   -__ 324, 784. 00
Unexpended balance June 30, 1934 ________________________402, 716. 00
           Total amount appropriated to June 30, 1934_--                                               -____.-____ 727, 500. 00

          Fiscal year ending June 30                          1930          1931                1932             1933            1934


Cost of new work-------.----------------------------------                                                        ----        $386, 281.81
-Cost of maintenance -------------                      ---------- - ---- ------------
                                                       __--                                              ----           ..
                                                                                                                 ... -----....
'Total expended ------------                 -------    ------------         -     ----     ---        ------        -         324, 784.00
Allotted-----------------                               ------------   ------------ ------------                 --------      727, 500. 00


Amount allotted from National Industrial Recovery Act approved
   June 16, 1933       __
                    ----------------------------------------                                                             $727,, 500. 00
,Gross amount expended__-_________                   ________-__-_                                                         324, 784. 00
       Balance unexpended June 30, 1934____________________                                                               402, 716. 00
Outstanding liabilities June 30, 1934_ __---___               -__- $22. 00
Amount covered by uncompleted contracts ____ -                 402, 694. 00
                                                                                                                           402, 716. 00

Amount allotted by Public Works Administration Emergency
  Appropriation Act, fiscal year 1935 ______ -- __________-                                                                500, 000. 00
Balance available for fiscal year 1935-----------------------                                                              500, 000. 00

Amount (estimated) required to be appropriated for completion
of Public Works Administration project 1__________________                                                              1, 750, 000. 00
Amount that can be profitably expended in fiscal year ending
                            1
June 30, 1936, for new work _______-____-__________                                                                     1, 600, 000. 00
       CONSOLIDATED COST AND FINANCIAL                                 SUMMARY FOR TAMPA                    HARBOR,           FLA.

Cost of new work to June 30, 1934____________________                                                              $6, 153, 344. 13
'Cost of maintenance to June 30, 1934_____________                                                                   1, 155, 529. 36
      Total cost of permanent work to June 30, 1934 __________                                                           7, 308, 873.   49
Value of plant, materials, etc., on hand June 30, 1934 ..... _...                                                           168, 042.   85
     Net total cost to June 30, 1934________________________                                                             7, 476, 916.   34
Plus accounts receivable June 30, 1934 ____________-________                                                                 13, 939.   85
      Gross total costs to June 30, 1934_____________________                                                        7, 490, 856. 19
Minus accounts payable June 30, 1934 .. _____.               ____-____-                                                  88, 198. 33
           Net total expenditures_-------                                                         __                     7, 402, 657. 86
Unexpended balance June 30, 1934-.... --                                                                                531, 404. 45
     Total amount appropriated to June 30, 1934----------                                                            7, 934, 062. 31
   1Exclusive of available funds.
518         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                1934


        Fiscal year ending June 30                  1930                1931       1932           1933            1934


Cost of new work __________________             .... ..          $95,986.68      $7, 602. 68 $128, 768. 52 $519, 558. 58
Cost of maintenance        ----------          $83, 708. 67      106, 656. 39   113, 259. 89   56, 750. 55   43, 474. 73
      Total cost__---     _-_-------------        83, 708. 67    202, 643. 07   120, 862. 57   185, 519. 07     563, 033. 31

Total expended__--      -----------------         94, 945. 26    183, 053. 57   88, 369. 28    127, 655. 70     478, 298. 47

Allotted_----------------------- ----- 101, 000. 00              198, 440. 00    16, 000. 00   285, 787. 68     789,763.08



Balance unexpended July 1, 1933--_____                                                                   $219, 939. 84
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934---------------------- $30, 000. 00
Amount allotted from War Department Appropriation
Act approved July 14, 1932-------------------     42, 236. 09
Amount allotted from National Industrial Recovery
Act approved June 16, 1933----___--   -------    727,
                                                  7---- 500. 00
                                                                                                          799, 736. 09

      Amount to be accounted for_______ ___________-- -    ___ 1, 019, 675. 93
Deductions on account of revocation of:
   Allotment --------------------------------------  4, 302. 32
   Impounded funds--     _____-____-----------  ---- 5, 670. 69
                                                                    9, 973.01

      Net amount to be accounted for         --- ____- -- ____ 1____-, 702. 92                        1,00,
Gross amount expended_- ---- ___-__-___-____ 629, 503. 15
Less:
    Reimbursements collected---------- $151, 038.20
    Receipts from sales_------   -_______    166. 48
                                                     151, 204. 68
                                                                                                         47R 298. 47

      Balance unexpended June 30, 1934_____                                                               531, 404. 45
Outstanding liabilities June 30, 1934___ ____________   19, 177. 62
Amount covered by uncompleted contracts_----       ___ 446, 556. 82
                                                                                                         465, 734. 44
     Balance available June 30, 1934_ _____-_________-     __ _                                               65, 670. 01
Accounts receivable June 30, 1934-----------------------------                                                13, 939. 85
     Unobligated balance available June 30, 1934 -------------                                                79, 609. 86
Amount allotted by Public Works Administration Emergency Ap-
propriation Act fiscal year 1935 __________________________ -                                           500, 000. 00
Balance available for fiscal year 1935_____---- --                                   __-         -____-579,
                                                                                                         609. 86
Amount (estimated) required to be appropriated for completion of
   Public Works Administration project                                                                    750, 000. 00
                                                                                                       1---------1,

Amount that can be profitably expended in fiscal year ending
June 30, 1936:
   For new work 1- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- 1, 600, 000. 00
     For maintenance                                  ---------------                                         92, 000. 00

         Total                               -.                                                        1, 692, 000. 00
                           17. ST. PETERSBURG HARBOR, FLA.
  Location.-St. Petersburg is situated on the west shore of Tampa
Bay, about 17 miles from the entrance of Tampa Bay, 21 miles from
Tampa, and 83/4 miles from Port Tampa. The entrance to Tampa
Bay, known as Egmont Channel, is on the west coast of Florida,
  1 Exclusive of available funds.
       RIVERS AND HARBORS-JACKSONVILLE,          FLA.,   DISTRICT   519
about 200 miles north of Key West. (See U. S. Coast and Geodetic
Survey Chart No. 587.)
   Previous projects.-Adopted by act of July 25, 1912.' The cost
and expenditures were $53,220.25, of which $32,688.62 was for new
work and $20,531.63 was for maintenance. For further details see
page 769 of Annual Report for 1929.
   Existing project.-This provides for a channel 250 feet wide, 19
feet deep, from that depth in Tampa Bay to the basin at the port of
St. Petersburg, a distance of about 1 mile, and for a depth of 21 feet,
1,400 to 1,700 feet long and 900 feet wide, in the port of St. Peters-
burg. The mean range of tide is 1.5 feet. The extreme range is
1.9 feet. Strong southwesterly winds raise the water level about 1.5
feet. Strong northerly winds, which occur mostly during the winter
months, lower the water level about 2 feet.
    The estimate of cost for new work, made in 1928, was $45,000, ex-
clusive of amounts expended on previous projects:. The latest (1928)
approved estimate for annual cost of maintenance is $5,000. The
existing project was adopted by the River and Harbor Act of July 3,
1930 (S.Doc. No. 229, 70th Cong., 2d sess.). The latest published
map is in that document.
   The Deficiency Act of March 4, 1929, authorized the expenditure
of $17,000 for dredging a channel 16 feet deep and approximately
200 feet wide on the easterly side of Point Pinellas lighted beacon in
a direction approximately 328 ° true, the westerly boundary of the
channel to be dredged as close to the said beacon as practicable.
   Local coo peration.-Fully complied with.
   Terminal facilities.-In Bayboro Harbor are 9 privately owned
marginal wharves having a total length of 515 feet. A concrete
municipal quay 800 feet long faces Bayboro Harbor along its north-
east side and a spur of the municipal electric railway has been
extended to this quay. A concrete wharf 1,500 feet long, constructed
by the city of St. Petersburg, extends along the north side of the
dredged basin known as the port of St. Petersburg. The facilities
are adequate for present needs. For further details see page 731,
Annual Report for 1932.
    Operations and results during fiscal year.-A predredging survey
was made during the month of January 1934. The cost and expendi-
tures were $782.04 for maintenance.
    Condition at end of fiscal year.-The existing project was com-
pleted in the calendar year 1931 at a saving of $753 under the esti-
mated cost. The south edge of the entrance channel coincides with
the axis of the former 10-foot Government channel leading into
Bayboro Harbor. The controlling depths at mean low water are 19
feet for a width of 150 feet in the entrance channel and 21 feet for an
area of 900 feet by 1,400 feet in the port of St. Petersburg. The total
cost and expenditures on the existing project, exclusive of the Point
Pinellas Channel, have been $45,028.94, of which $44,246.90 was for
new work and $782.04 was for maintenance.
    The sum of $17,000 was expended on the Point Pinellas Channel
in 1929-30, securing a channel 6,200 feet long and 200 feet wide, with
a controlling depth of 14 feet. The present controlling depth is
14.5 feet.
520        REPORT OF CHIEF OF ENGINEERS,                                   U.        S.    ARMY,            1934

  Proposed operations.-The balance unexpended ($544.97) will be
applied to the supervision of the project.
  No funds can be profitably expended for maintenance during
the fiscal year 1936 for the reason that no work is expected to be
required to meet the needs of commerce during this period.
                                   Cost and financial swinmary

Cost of new work to June 30, 1934______________________._                                                              $93, 935. 52
Cost of maintenance to June 30, 1934 _____________________-                                                             21, 313. 67
        Total cost of permanent work to June 30, 1934                                ------------                      115, 249. 19
Net total expenditures------___     ------------                                                                       115, 249.19
Unexpended balance June 30, 1934_-----------------------------                                                              544. 97
        Total amount appropriated to June 30, 1934---------------                                                      115, 794. 16

        Fiscal year ending June 30                  1930           1931                  1932              1933              1934


Cost of new work-....--------------------        $17, 000. 00   $44, 246. 90    ..                                       _____----
Cost of maintenance __18.                                  95      _--               -     -       ---            --          $782. 04
      Total cost .-----------------------         17, 018. 95    44, 246. 90              - --         -                       782. 04
Total expended__-----------------------16, 60367                 44, 238. 86              $8. 04                               782. 04

Allotted ...    ..----------------------------    17, 000. 00    50, 587. 55     -6, 753. 10               $15, 000       -13, 672. 99



Balance unexpended July 1, 1933- -----                                                                                 $15, 000. 00
Amount allotted from War Department Appropriation                                                Act       ap-
  proved July 14, 1932___--                                                                                                 750. 00

     Amount to be accounted for_-- ---------------                                                                      15, 750. 00
Deductions on account of:
   Revocation of allotment------------------------ $14, 403.93
   Impounded funds -------------------------------        9. 06
                                                                                                                        14, 422. 99

      Net amount to be accounted for                      , 327. 01
                                                         1---------------------------
Gross amount expended---------------------------------782.        04

        Balance unexpended June 30, 1934_ .____-__-____-___                                                                544. 97
18. CHANNEL FROM CLEARWATER HARBOR THROUGH BOCA CIEGA
                 BAY TO TAMPA BAY, FLA.

  Location.-Clearwater Harbor and Boca Ciega Bay are sounds
on the west coast of the peninsula of Florida, north of Tampa Bay,
separated from the Gulf of Mexico by a chain of low sand keys.
With the Narrows, which connects them, they form a part of the
coastal waterway from Tampa Bay to St. Josephs Sound. (See
U. S. Coast and Geodetic Survey Chart No. 157.)
  Existing project.--This provides for dredging a channel 50 feet
wide and 5 feet deep at mean low water from Clearwater Harbor
to Boca Ciega Bay and through the upper part of said bay, thence
100 feet wide and 8 feet deep at mean low water to Tampa Bay.
The length of the waterway covered by the project is 26 miles. The
mean range of tide is about 1.8 feet. The extreme range is about 2.3
             RIVERS AND HARBORS-JACKSONVILLE,                                      FLA., DISTRICT              521
feet. Strong southwesterly winds raise the water level about 1 foot.
Strong northerly winds, which usually occur in the winter months,
lower the water level about 11/ feet.
   The estimate of cost for new work, revised in 1919, was $101,200.
The latest (1928) approved estimate for annual cost of maintenance
is $6,000.
   The existing project was adopted by the following river and har-
bor acts: The act of June 25, 1910, provided for all' except the 8-foot
channel (H. Doc. No. 1190, 60th Cong., 2d sess.), and the act of
March 2, 1919, provided for the 8-foot channel (H. Doc. No. 135, 63d
Cong., 1st sess.). The latest published maps are in these documents.
   Terminal facilities.-These consist of six wharves, used for freight
and passengers, having a total berthing space of 540 feet. All have
highway connections, the wharf at Gulfport having connections with
the St. Petersburg Electric Railway also. The facilities are ample
for the needs of the locality and are open to the public.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The project was completed in
1920. The controlling depth at the entrance is 8 feet, in the upper
bay 4 feet, and 31/2 feet north of McKays Creek in Clearwater
Harbor. The total costs and expenditures have been $197,848.23,
of. which $105,877.01 was for new work and $91,971.22 was for
maintenance.
   Proposed operations.-The balance unexpended ($10,000), will be
applied to maintenance dredging with leased plant, 2 months, No-
vember and December 1934, removing shoals throughout the project
as required.
   No funds can be profitably expended for maintenance during the
fiscal year ending June 30, 1936, as the work contemplated during
the fiscal year 1935 is expected to meet the needs of commerce during
this period.
                                     Cost and financial summary

Cost of new work to June 30, 1934-......                     $105, 877. 01
Cost of maintenance to June 30, 1934------------------------   91, 971. 22

           Total cost of permanent work to June 30, 1934-----------                                   197, 848. 23

Net total expenditures-----------------------------------197, 848. 23
Unexpended balance, June 30, 1934---------------------------10, 000. 00

           Total amount appropriated to June 30, 1934                                                 207, 848. 23

           Fiscal year ending June 30                  1930          1931          1932       1933          1934

Cost of new work .-                     -           ----                          ---------
                                                                                         _------     -------       -
Cost of maintenance                                $16, 052. 89   $13, 801. 94
Total expended         ..-----------------------    15, 903. 28    13, 791. 94-
Allotted      _-------------                        20, 000. 00     -273. 64                              $10, 000. 00


Amount allotted from War Department Appropriation Act approved
  April 26, 1934   ------------------------------------------- $10,000
Balance unexpended June 30, 1934                                10, 000
522       REPORT OF CHIEF OF ENGINEERS,    U.   S. ARMY,   1934

                     19. ANCLOTE RIVER, FLA.

   Location.-Rises in the western part of the peninsula of Florida
and flows southwesterly, emptying into the Gulf of Mexico about
38 miles north of the entrance to Tampa Bay. (See U. S. Coast
and Geodetic Survey Chart No. 1257.)
   Existing project.-This provides for dredging a channel 100 feet
wide and 6 feet deep at mean low water with width increased at
entrance and at bends from Anclote Anchorage in the Gulf of Mexico
to the county bridge at Tarpon Springs, with a turning basin at
the latter point 200 feet wide and 500 feet long. The length of
the section included in the project is about 41 miles. The mean
range of tide is about 1.5 feet at the entrance and 2 feet at Tarpon
Springs. The extreme range is about 2 feet at'the entrance and 2.5
feet at Tarpon Springs. Strong southwesterly winds raise the
water level about 1 foot. Strong northerly winds, which occur
mostly during the winter, lower the water level about 11/2 to 2 feet.
   The estimate of cost for new work, revised in 1927, is $82,500. The
latest (1927) approved estimate of cost for annual maintenance is
$6,000.
   The project was adopted by the following river and harbor acts:
The act of March 3, 1899, provided for a channel 6 feet deep to
Sponge Harbor and thence 4 feet deep to Tarpon Springs (H. Doc.
No. 200, 55th Cong., 2d sess.), and the act of January 21, 1927,
extended the 6-foot channel to Tarpon Springs (H. Doc. No. 18, 63d
Cong., 1st sess.). The latest published maps are in the latter docu-
ment and House Document No. 229, Seventy-second Congress, first
session.
  Recommended modifications of project.-Under date of January
13, 1932, the Chief of Engineers recommended modification of the
existing project so as to provide for a channel 100 feet wide and 9
feet deep from the Gulf of Mexico to the lower end of the present
turning basin, the channel to be suitably widened at the entrance and
at bends, at an estimated cost of $90,000, with $8,000 annually for
maintenance, subject to certain conditions of local cooperation, in-
cluding a contribution of $20,000 (H. Doc. No. 229, 72d Cong., 1st
sess.).
   Under date of April 13, 1934, the Chief of Engineers recommended
the elimination of the requirement that local interests contribute
$20,000 toward the cost of the improvement recommended (Rivers
and Harbors Committee Doc. No. 36, 73d Cong., 2d sess.).
   Terminal facilities.-These consist of one municipal marginal
wharf at Tarpon Springs, berthing space 330 feet, with about 51/2
feet of water, used by sponge and fish boats and small launches.
Highway connection only is provided. The facilities are inadequate
for the needs of the locality.
   Operations and results d tring fiscal year.-None.
   Condition at end of fiscal year.-The project was completed in
1929 at a saving of $14,622 under the estimated cost. The con-
trolling depth at mean low water from Anclote Anchorage to Tarpon
Springs is 5.5 feet for a width of 75 feet. The total cost and expen-
ditures have been $151,192.32, of which $76,051.86 was for new
work and $75,140.46 was for maintenance.
             RIVERS AND HARBORS-JACKSONVILLE,                                      FLA.,   DISTRICT          523

   Proposed operations.-The balance unexpended ($12,000) will be
applied to maintenance dredging with leased plant, 2 months, Sep-
tember and October 1934, removing shoals throughout the project as
required.
   No funds can be profitably expended for maintenance during the
fiscal year ending June 30, 1936, as the work contemplated during
the fiscal year 1935 is expected to meet the needs of commerce during
this period.
                                         Cost and financial summary

Cost of new work to June 30, 1934----------------------------                                       $76,  0151. 86
Cost of maintenance to June 30, 1934                                                                     140. 46
                                                                                                     7----------------------------

           Total cost of permanent work to June 30, 1934--------------151, 192. 32

Net total expenditures----------------------------------------                                      151, 192. 32
                                ------------------------------
Unexpended balance June 30, 1934_                                                                    12, 000. 00

         'Total      amount appropriated to June 30, 1934--------------- 163, 192. 32

          Fiscal year ending June 30                    1930          1931         1932      1933         1934


Cost of new work-----------         ------            $8, 174. 83
Cost of maintenance      ----------------------------               $8, 337. 47
Total expended-----------...          ------.          8, 319. 90    8, 337. 47      --------------------
Allotted ---------              ----------------       4, 000. 00    -849. 78 --                        $12, 000. 00


Amount allotted from War Department Appropriation Act approved
  Apr.26, 1934-------------------------------------------------   $12, 000
Balance unexpended June 30, 1934---------------------------------  12, 000

                               20. WITHLACOOCHEE                      RIVER, FLA.

   Location.-Rises in the central part of the peninsula of Florida
and flows in a general northwesterly and westerly direction, empty-
ing into the Gulf of Mexico about 20 miles southeast of Cedar
Keys, Fla., and 95 miles north of the entrance to Tampa Bay. (See
U. S. Coast and Geodetic Survey Chart No. 179.)
   Previous projects.-A project for the improvement of the entrance
was adopted by the River and Harbor Act of June 13, 1902. The
cost and expenditures under this project were $30,000 for new work.
For further details see page 1832 of the Annual Report for 1915.
   Existing project.-This provides for securing and maintaining a
channel 100 feet wide and 10 feet deep at mean low water from the
10-foot contour in the Gulf of Mexico to Port Inglis, just within the
river entrance, by dredging and rock excavation, and for removing
snags, overhanging trees, and loose rock, and cutting through shoals
in the upper river, with a view to making a draft of 2 feet available
for about half the year as far as Pembertons Ferry (Croom), 85
miles above the mouth. The lengths of the sections included in the

                                                      'The
project are 4.1 miles from the Gulf to Port Inglis and 85 miles to
Pembertons Ferry (Croom).           mean tidal range is 2.8 feet, and
the extreme range is about 3.5 feet at the mouth. The effect of the
tide is perceptible for about 11 miles above the mouth. Strong
524    REPORT   OF CHIEF OF ENGINEERS,      U.   S.   ARMY,   1934


southwesterly winds raise the water level at the mouth about 1 foot,
and strong northerly winds, which usually occur during the winter,
lower the water level about 11/2 feet. Freshets raise the water level
in the upper river from 4 to 6 feet and at the mouth about 1 foot.
The estimate of cost for new work, revised in 1925, is $385,000, exclu-
sive of amounts expended on previous projects. The latest (1928)
approved estimate for annual cost of maintenance is $1,500.
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1881, provided for the work in the
upper river (Annual Report for 1880, pp. 1110-1119); the act of
March 2, 1907, provided for the work at the entrance (H. Doc. No.
483, 59th Cong., 2d sess.). The latter document contains the latest
published map of the entrance. The latest published map of the
river to Pembertons Ferry (Croom) is in House Document No. 199,
Fifty-fifth Congress, second session.
   Terminal facilities.-These consist of a small oil-transfer wharf
at Inglis, one small dock at Panasoffkee open to public use, and pri-
vate landing docks scattered along the river. The facilities are con-
sidered ample for present commerce.
   Operations and results during fiscal year.-Maintenance dredging,
under contract, to restore project depth in the entrance channel from
Port Inglis to the Gulf of Mexico, commenced May 10, 1934, was
completed June 20, 1934. There were removed 52,486 cubic yards of
material from 6,046 linear feet of channel. Project depth with over-
depth was obtained throughout the section dredged. The cost was
$15,501.18 for maintenance and the expenditures $14,555.37.
   Condition at end of fiscal year.-The project for the entrance is
about 85 percent completed. The channel from Port Inglis to the
10-foot contour in the Gulf has been dredged to a depth of 10 feet at
mean low water and a width of 85 feet, whereas a width of 100 feet is
required under the project. The total cost of this work has been
$302,766.60, of which $255,385.29 was for new work and $47,381.31
for maintenance.
   Snags, overhanging trees, sunken logs, loose rock, and boulders,
and some rock ledges were removed from the upper river, enabling
light-draft boats to ascend the river to Pembertons Ferry (Croom)
except at low stages. This project was practically completed during
the fiscal year 1893. The river is now fairly clear of obstructions
between Croom and the power dam and between the power dam and
the mouth. The lock at the power dam is inoperative. The total
cost of this work has been $31,888.92, of which $29,700 was for new
work prior to 1894 and $2,188.92 was for subsequent maintenance.
   The project as a whole is 74 percent complete, the work remaining
being the 15-foot widening of the entrance channel at Port Inglis,
which is not considered necessary at the present time, due to the
relatively small use being made of this channel.
   The controlling depth from the Gulf to Port Inglis, in June 1934,
was 9.5 feet for a width of 80 feet. Above Port Inglis the control-
ling depths are about as follows: From Port Inglis to Inglis, about
7 miles from mouth, 6 feet; from Inglis to lock in Florida Power
Corporation's dam, 11 miles above the mouth, 4 feet; from the lock
           RIVERS AND HARBORS-JACKSONVILLE,                              FLA., DISTRICT               525

to Stokes Ferry, 4 feet; to the head of navigation at Pembertons
Ferry (Croom), 85 miles from the mouth, the limiting depth is
about 2 feet during half the year and 1 foot during low stage. The
depths referred to are mean low water of the Gulf from the Gulf to
the dam and to low-water stage of the river above that point.
   The total cost of the existing project has been $334,655.52, of
which $285,085.29 was for new work and $49,570.23 was for mainte-
nance. The expenditures have been $333,709.71.
   Proposed operations.--The balance unexpended July 1, 1934
 ($995.04), will be applied to the payment of accounts payable and
to the supervision of the project.
   No funds can be profitably expended for maintenance during the
fiscal year 1936 for the reason that no work is expected to be required
to meet the needs of commerce during this period.
                                 Cost and financial summnary

Cost of new work to June 30, 1934__________________________                                  $315, 085.29
cCost of maintenance to June 30, 1934___________________--__                                   49, 570. 23

     Total cost of permanent work to June 30, 1934------------364, 655. 52
Minus accounts payable June 30, 1934__________________________     945. 81

        Net total expenditures______                 ____     ________            _____       363, 709. 71
Unexpended balance June 30, 1934 .....-                                                            995. 04
        Total amount appropriated to June 30, 1934_________-___                               364, 704. 75

        Fiscal year ending June 30            1930           1931         1932        1933          1934


Cost of new work- .......
Cost of maintenance       _              -----------------------                                  $15, 501. 18
Total expended.        --------------------------------------------------------                    14, 555. 37
Allotted -----------------------------    ------            -$107. 38 ---------- $12, 000. 00       3, 550. 41


Balance unexpended July 1, 1933-------------------------------          $12, 000. 00
Amount allotted from War Department Appropriation
  Act approved July 14, 1932___________________________    $300. 00
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933                                  300. 00
                                                          3-----------------------,
                                                                           3, 600. 00

     Amount to be accounted for _________---------------                                        15, 600. 00
Deductions on account of revocation of impounded funds----------                                     49. 59

      Net amount to be accounted for____ -                                              550. 41
                                                                        -___________---15,
Gross amount expended -------------------                                           14, 555. 37

      Balance unexpended June 30, 1934__--     ----         -___--------- 995.04
Outstanding liabilities June 30, 1934________-______--________            945. 81

        Balance available June 30, 1934__________--------_____                                      49.23

Amount (estimated) required to be appropriated for completion
of existing project ------------------------------------- 100, 000. 00
   1Exclusive of available funds.
526     REPORT OF CHIEF OF ENGINEERS, U.      S.   ARMY,   1934

21. REMOVING THE WATER HYACINTH FROM NAVIGABLE WATERS
                     IN THE STATE OF FLORIDA

   Location.-The water hyacinth is found in the fresh-water streams
and lakes in various parts of the State, including the St. Johns
River and its tributaries, the Withlacoochee River and its tribu-
taries, and the Caloosahatchee and Kissimmee River system.
   Existing project.-The existing project, as modified, provides for
the destruction or removal of the water hyacinth in the navigable
waters of the State so far as they constitute an obstruction to com-
merce, using any mechanical, chemical, or other means not injurious
to cattle. The use of log booms to close sloughs and backwaters as
an auxiliary means was contemplated. No estimate of the final cost
of the work has been made. The latest (1928) approved estimate of
annual cost of maintenance is $7,000.
   The existing project was adopted by the River and Harbor Act of
March 3, 1899 (H. Doc. No. 91, 55th Cong., 3d sess.). The project
was modified by the River and Harbor Act of June 13, 1902, which
authorized the exterminating and removing water hyacinth from
navigable waters by any mechanical, chemical, or other means what-
soever. The project was again modified by the River and Harbor
Act of March 3, 1905, which prohibited the use of any chemical
process injurious to cattle which might feed upon the plant.
   Operations and results during fiscal year.-Periodic inspections:
were made at a number of localities in the St. Johns River and its
tributaries and on the Withlacoochee River between the Florida
Power Corporation's dam, 13 miles from the mouth, and Croom
 (Pembertons Ferry), 72 miles farther upstream. Hyacinth jams,
menanclng navigation, were removed by hired labor, by the drifting
process, intermittently throughout the fiscal year, excepting that
no work was done during February and March. During the fiscal
year 1,358,850 square yards of hyacinth jams were broken up and
drifted from the Withlacoochee River between Croom and the
Florida Power Corporation's dam; 3,182,800 square yards from
various, localities on the upper St. Johns River; and from Swim-
ming Pen Creek, Black Creek, Trout Creek, Rice Creek, Dunns
Creek, Spring Garden Creek, and the Wekiva River, a total of
1,150,460 square yards were removed. The total removed during
the fiscal year amounted to 5,692,110 square yards. This work re-
sulted in reasonably clear channels being maintained in the Withla-
coochee River from the Florida Power Corporation's dam to Croom
and in the navigable tributaries to the St. Johns River. In the
St. Johns River a clear channel was maintained and navigation
suffered no serious delays on account of hyacinth jams. The total
cost during the fiscal year was $8,940 for maintenance and the
expenditures were $9,348.60.
   Condition at end of fiscal year.-By various means portions of
the Withlacoochee River between the Florida Power Corporation's
dam, 13 miles above the mouth, and Pembertons Ferry (Croom)
have been cleared of hyachinth obstructions from time to time, and
now a reasonably clear channel exists for shallow draft navigation
from the dam to Croom, a distance of approximately 72 miles. A
considerable length of the upper portion of the Withlacoochee River
between Croom and Silver Lake is blocked by this growth, as are
also the creeks and sloughs tributary to the St. Johns River, Kissim-
                 RIVERS AND HIARBORS-JACKSONVILLE,                              FLA.,        DISTRICT           527

mee River, Rice Creek, Black Creek, Trout Creek, and Six Mile
Creek, where there is practically no traffic to disturb and keep the
plant broken up. During high stages of water the creeks and
sloughs discharge the hyacinth into the main rivers, at times in
such quantities as to become a serious menace to navigation, prin-
cipally at bridges. High water, due to unusually heavy rainfall
during recent months, has resulted in the hyacinth becoming more
troublesome in all streams than ever before. On the St. Johns River
at Jacksonville, the water front has been covered with drifting
hyacinth since about April 15, 1934.
   The total cost has been $260,529.34, all for maintenance, and the
expenditures $260,501.41.
   Proposed operations.-The balance unexpended July 1, 1934
 ($8,105.53), will be applied to maintenance involved in the removal
of the water hyacinth in the St. Johns River and tributaries, the
Withlacoochee River, and in any other navigable waterways in the
district where such work may become necessary.
   The amount that can be profitably expended during the fiscal
year ending June 30, 1936 ($7,000), will be applied to the removal
of the water hyacinth by hired labor from the various navigable
waterways in the district as such work becomes necessary.
                                      Cost and financial summary
Cost of maintenance to June 30, 1934 ------------------------ $260, 529. 34
Minus accounts payable June 30, 1934---------------------------      27. 93

      Net total expenditures ------------------------------                                           260, 501. 41
Unexpended balance June 30, 1934,_           -_                                                         8, 105. 33

            Total amount appropriated to June 30, 1934---------------                                 268, 606. 74

            Fiscal year ending June 30              1930          1931          1932           1933           1934


Cost of new work---------------
Cost of maintenance----         ---------------   $7, 548. 18   $7, 495. 36   $7, 526. 38'   $3, 244. 22     $8, 940. 00

Total expended__.-----------------------           7, 784. 59   $7, 405. 73    7, 907. 65     2, 839. 43      9, 348. 60

Allotted....--    ...-------------------------     7,000. 00     6, 000. 00    2, 500.00     13, 795. 74      6, 311.00


Balance unexpended July 1, 1933---------------                                                         $11, 142. 93
Amount allotted from War Department Appropriation                                        Act ap-
  proved Apr. 26, 1934_ _______                                                                            7, 000. 00

      Amount to be accounted for--------------------  --- --    18, 142. 93
Deductions on account of revocation of impounded funds---------     689. 00

      Net amount to be accounted for ------------------------                  17, 453. 93
                      -------------------------
Gross amount expended__                                       $10, 921. 08
Less reimbursements collected-_-----                               572. 48
                                                                1----------------,
                                                                                 9, 348. 60

      Balance unexpended June 30, 1934---------------------- 8, 105. 33
Outstanding liabilities June 30, 1934----------------------------- 27. 93

            Balance available June 30, 1934-------------------------8,                                       077. 40

Amount that can be profitably expended in fiscal                 year ending June
                          1- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
    30, 1936, for maintenance _ _                    _                                                     7, 000. 00
   1 Exclusive of available funds.
           91536--ENa      1934--34
528           REPORT OF CHIEF OF ENGINEERS,                               U. S. ARMY,              1934

    22. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                 (GENERAL)
   The cost of work during the fiscal year was $206,337.21 and the
expenditures $209,529.11. The total cost has been $679,084.98 and
the total expenditures have been $677,865.31. The balance unex-
pended June 30, 1934, together with accounts receivable ($62,703.34),
will be applied as needed during the fiscal year 1935 to payment of
expenses to be incurred in connection with the above items. The
additional sum of $36,000 can be profitably expended during the
fiscal year ending June 30, 1936.
                                    Cost and financial summary
Cost of maintenance to June 30, 1934___________________--___     _ $679, 084. 98
Value of plant, materials, etc., on hand June 30, 1934-----------     2:,431.47

      Net total cost to June 30, 1934__________________------                                           681, 516. 45
Plus accounts receivable June 30, 1934________________                                                       278. 50

          Gross total costs to June 30, 1934________________                                            681, 794. 95
Minus accounts payable June 30, 1934_.....__                                  -_____----                      3,929. 64

     Net total expenditures-----    ---------------------                                               677, 865. 31
Unexpended balance June 30, 1934________________________--____                                           62, 424. 84

         Total amount appropriated to June 30, 1'934______________                                      740, 290. 15

         Fiscal year ending June 30                1930            1931          1932            1933            1934


Cost ofnew work-----------------           --
Cost of maintenance ------------------          $55, 108. 16   $69, 912. 35   $62, 581. 99 $213, 861. 38      $206, 337. 21

Total expended- ------------------------ 60, 440. 44            68, 668. 28    66, 553. 33   210, 320. 31      209, 529. 11

Allotted.....--------------   --------------     36, 400.00     64, 500.00     66, 250.00    264, 772.18       189, 867.97


Balance unexpended July 1, 1933________________-------______                                            $82, 085. 98
Amount allotted from War Department Appropriation
                                  ------------
Act approved Apr. 26, 1934_--______                $59, 000. 00
Amount allotted from War Department Appropriation
Act approved July 14, 1932__________               137, 914. 02
                                                                                                        196, 914. 02

     Amount to be accounted for____________------_____                                                  279, 000. 00
Deductions on account of revocation of impounded funds----------                                          7, 046. 05

         Net amount to be accounted for ___-__---                                   -                   271, 953. 95
Gross amount expended____ ____--                                                 $219, 357.75
Less:
    Reimbursements collected------------                        $9,816. 14
    Receipts from sales________________                             12. 50
                                                                                        9, 828. 64
                                                                                                        209, 529. 11

      Balance unexpended June 30, 1934________________----____                                              62, 424. 84
Outstanding liabilities June 30, 1934__-----------__-------------                                            3, 929. 64

     Balance available June 30, 1934_ ______________----------                                              58, 495. 20
Accounts receivable June 30, 1934_ __----------------------------                                               278. 50
     Unobligated balance available June 30, 1934_______________                                             58, 773. 70
Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance ----------------------------------                                               36, 000. 00
   1Exclusive of available funds.
             RIVERS        AND HARBORS-JACKSONVILLE,                                             FLA.,            DISTRICT                      529

                 23.     Other projects for which no estimates are submitted
                       [Commercial statistics for these projects are given in Part 2 of report]


                                                                  For last         Cost and expenditures to
                                                                   full re-              June 30, 1934                                   Estimated
                       Name of project                            port see                                                              amount re-
                                                                  Annual                                                                 quired to
                                                                  Report           New work              Maintenance                     complete
                                                                    for-


1. St. Johns River, Fla., Jacksonville to Palatka 1                    1933        $205, 698. 47   $116, 328. 46                               $13, 300
2. Lake Crescent and Dunns Creek, Fla.1 2........                      1931          10, 276. 25      5, 723. 75                                53, 800
3. St. Lucie Inlet, Fla. 3___________________________                  1932         426, 688. 51 _          _                               1, 410, 000
4. Kissimmee River, Fla.--------                                       1931          23, 479. 18                  25, 202. 14             Completed
5.   Orange River, Fla.'1-....                        1931                            2,     000.   00            7, 921. 29                  Do
6.   Manatee River, Fla.1-----------------------1931                                123,     349.   56           81, 702. 44                  14, 400
7.   Crystal River, Fla.     ------------------------ 1919                           25,     000.   00            9, 000. 00              Completed
8.   Cedar Keys Harbor, Fla.'                         1932                          147,     020.   98           30, 000. 00                   3, 500
9.   Suwannee River, Fla. ' -                         1931                           76,     417.   96           32, 394. 06                 200, 000

     1 Channels adequate for commerce.
     2 Awaiting local cooperation.
     3 Abandonment recommended in H. Doc. No. 370, 65th Cong. 1st sess.
     4 Unexpended balance June 30, 1934, will be applied to general supervision of the project.

Status of reports called for by river and hlarbor acts and committee resolutions
                                I                           I
                                                                Transmitted                                                            Recommen-
           Locality                  Authorization act          to Congress
                                                                                              Document no.                               dation
                                i                                                                                                 Ii


Alafia River, Fla..--...            Senate     committee
                                     resolution, Apr. 19,
                                      1934.
                                    Senate committee
                                     resolution, Oct. 26,
                                       1933.                                         Rivers and Harbors
Anclote River, Fla_---              House committee             Apr. 13, 1934          Committee, 36, 73d                              Favorable.
                                     resolution, Feb. 8,                              Cong., 2d sess.
                                      1934.
Caloosahatchee         River,       Rivers and Harbors          Aug. 10,1933 - ----------------------                                  Unfavorable.
Fla.                                 Committee resolu-
                                     tion, Feb. 8, 1926.
Caloosahatchee River                Senate committee            July 18, 1933       - --- -- - ---- -- ---- ---                           Do.
and Lake Okeechobee                 resolution, June 9,
drainage areas, Fla.,                1932.
and inland waterway
from Port Everglades
to Caloosahatchee
River, via New River,
North New River
Canal,     and Lake
Okeechobee.
Caloosahatchee River                Senate committee
and Lake Okeechobee                 resolution, July 23,
drainage areas, Fla.,               1934.
extension of levees.
Clearwater Harbor,                  River and Harbor
  Fla., including Big                 Act, July 3, 1930.
  Pass and Little Pass.
Crystal River, Fla _---   Rivers and Harbors
                            Committee resolu-
                            tion, Feb. 9, 1934.                                    -----------           -   -    -   -   -   -



Fort Pierce Inlet, Fla___ Rivers and Harbors
                            Committee resolu-
                            tion, May 10, 1934.                                     ---------------------



Ho$lywood Harbor Rivers and Harbors                             Aug. 11,1933                                                              Do.
 (Port Everglades),         Committee resolu-
Fla.                       tion, Jan. 29, 1932.
    Do.....--...........  Rivers and Harbors
                             Committee resolu-
                            tion, Jan. 29, 1934.                                    --   -   -      -----        ---------



Homosassa River, Fla - Rivers and Harbors
                             Committee resolu-
                            tion, Feb. 9, 1934.
Key West Harbor, Fla__ Rivers and Harbors                       July     5, 1933                                                          Do.
                             Committee resolu-
                             tion, Jan. 25, 1930.
Kissimmee River, Fla., River and Harbor                         July     6, 1933                                                          Do.
from Kissimmee to           Act, July 3, 1930.
Fort Bassenger, and
from Fort Bassenger
to Lake Okeechobee.
530        REPORT OF CHIEF OF ENGINEERS' U. S. ARMY,                               193 4

       Status of reports called for by river and harbor acts and committee
                               resolutiomsn-Continued


        Locality              Authorization act   Transmitted      Document no.
                                                                                            Recommen-
                                                  to Congress                                 dation
                          i                                                            i



Lake Worth Inlet, Fla__ River and Harbor Dec. 7, 1933           House,   185,    73d       Favorable.
                             Act, July 3, 1930.                  Cong., 2d sess.
Little Sarasota Bay, RiVers and Harbors
   Fla., channel in be-      Committee resolu-
   tween Sarasota and       tion, May 18, 1934.
   Venice, and channel
   through Caseys Pass,
   Fla.
Miami Harbor, Fla_ --     Senate       committee Aug. 30,1933                                  Do.
                            resolution, Jan. 14,
                            1932.
             .-
     D o .....  . .-. -   Senate      committee
                            resolution, Apr. 19,
                            1934.
Oklawaha River, Fla., Rivers and Harbors
  to Kissimmee River        Committee resolu-
  system, via Lake Grif-    tion, Aug. 12, 1933.
  fin, Lake Tohopeka-
  liga and Lake Apopka.
Pithlachascotee River, Rivers and Harbors
  Fla.                      Committee resolu-
                            tion, Feb. 9, 1934.
St. Augustine Harbor, Rivers and Harbors
  Fla.                      Committee resolu-
                            tion, Feb. 27, 1934.
St. Johns River, Fla., in River and Harbor July 17,1933                                       Do.
  in vicinity of Dames      Act, July 3, 1930.
  Point and New Ber-
  lin.
St. Johns River, Fla., Senate         committee
  Jacksonville to Palat-    resolution, Mar. 20,
  ka.                       1926.
St. Johns River at San- Senate        committee
  ford to Indian River      resolution, Mar. 18,
  near Titusville, Fla.,    1932.
  waterway.
St. Petersburg Harbor, Rivers and Harbors
  Fla.                      Committee resolu-
                            tion, Feb. 23, 1933.
San Carlos Bay, Fla., River and Harbor Aug. 15,1933                                        Unfavorable..
  channel from Punta        Act, July 3, 1930.
  Rasa to deep water in
  Gulf of Mexico.
Sarasota Bay, Fla-___     Rivers and Harbors
                            Committee resolu-
                            tion, June 13, 1934.
Steinhatchee River, Fla Rivers and Harbors
                            Committee resolu-
                           tion, Apr. 13, 1934.
Waldo, Fla., canal to Rivers and Harbors
  Little Lake Santa Fe,     Committee resolu-
  via Lake Alto.           tion, Mar. 30, 1933.
Withlacoochee     River, River and Harbor Aug. 10,1933                                        Do.
  Fla.                      Act, July 3, 1930.
     Do.......            Rivers and Harbors
                            Committee resolu-
                           tion, Feb. 27, 1934.


   IMPROVEMENT OF RIVERS AND HARBORS IN THE
             MOBILE, ALA., DISTRICT
  The district includes the western portion of the State of Georgia,
the northwestern portion of the State of Florida, the State of Ala-
bama, except the extreme northern portion, the eastern portion of
the State of Mississippi, and a small portion of the State of Louisiana
and Tennessee. It includes, specifically, the harbors on the coast of
Mississippi and Alabama, the harbors in the northwestern portion
of Florida, and all rivers flowing into the Gulf of Mexico west of
and including Aucilla River, in Florida, to and including the Pearl
River, La., and Miss.
              RIVERS AND HARBORS---MOBILE,            ALA.,   DISTRICT           531
   The Montgomery, Ala., and Mobile, Ala., districts were con-
solidated on October 1, 1933, to be known as the " Mobile, Ala., dis-
trict ", with headquarters at Mobile, Ala.
   District engineer: Lt. Col. R. S: Thomas, Corps of Engineers.
   District engineer of the Montgomery district to September 30,
1933, Maj. R. A. Sharrer, Corps of Engineers.
   D'ivision engineer: Col. Warren T. Hannurn, Corps of Engineers.
                                    IMPROVEMENTS

                                     Page                                        Page
1. Carrabelle Bar and Harbor,              14. Operating and care of locks
     Fla                ____          531          and dams on Coosa River,
2. Apalachicola Bay, Fla_ -..        533         Ga. and Ala______     ___       562
3. Apalachicola River, Fla., the           15. Mobile Harbor, Ala ______         563
      cut-off, Lee Slough, and              16. Black Warrior,      Warrior,
      Lower Chipola River -_                      and Tombigbee Rivers,
4. Upper Chipola River, Fla.,                    Ala                             568
       from Marianna to its                 17. Tombigbee River from De-
      mouth -----------------         538         mopolis, Ala., to Walkers
5. Channel from Apalachicola                     Bridge, Miss _______            575
       River to St. Andrews Bay,            18. Operating and care of locks
      Fla ___-                        539         and dams on Black War-
6. St. Andrews Bay, Fla _____        541          rior, Warrior, and Tom-
7. Narrows in Santa Rosa                         bigbee Rivers, Ala ___.         577
       Sound, Fla_                    545   19. Bayou Labatre, Ala_______         578
8. Blackwater River, Fla__ __        546   20. Pascagoula Harbor, Miss___        580
9. Escambia and Conecuh                    21. Gulfport Harbor and Ship
      Rivers, Fla. and Ala__ __       547         Island Pass, Miss_______        582
10. Pensacola Harbor, Fla ____        549   22. Biloxi Harbor, Miss__ __          586
11. Intracoastal Waterwa y                  23. Removing the Water Hya-
       from Pensacola Bay, Fla.,                  cinth (Mobile River, Ala.,
      to Mobile Bay, Ala ___.__       553          tributaries) ________-- ___    588
12. Intracostal Waterway from               24. Examinations, surveys, and
      Mobile Bay, Ala., to New                    contingencies (general)__       590
      Orleans, La .........-..              25. Other projects for which no
13. Alabama River, Ala_    ......     557         estimates are submitted__       591

                  1. CARRABELLE       BAR AND HARBOR, FLA.

   Location.-CarrabelleBar and Harbor are located on the coast
of northwest Florida, about 185 miles east of Pensacola Harbor.
 (See U. S. Coast and Geodetic Survey Chart No. 182.)
   Previous projects.-Adopted by the act of June 3, 1896. The cost
and expenditures on this project were $21,704.08 for new work. For
further details see page 1833 of Annual Report for 1915.
   Existing project.-The existing project provides for a channel
across the inner and outer bars at East Pass 150 feet wide and 201/2
feet deep at mean low water, including the closing of an opening in
Dog Island; and for a channel 18 feet deep and 100 feet wide from
the 18-foot contour in the outer harbor to a point about 2,500 feet
outside the mouth of the river, with a suitable turning basin at this
point, thence 10 feet deep and 100 feet wide to the wharves at Carra-
belle. The total length of the 10-foot channel is 5,500 feet; of the
18-foot channel, 7,000 feet; and of the 201/2-foot channel, about 238
miles. The mean range of tide throughout this harbor is 1.4 feet,
while the extreme range, except during storms, is 4 feet. The esti-
mated cost of the channel across the bars at East Pass, together with
the closing of the Dog Island opening, made in 1899, exclusive of
532     REPORT    OF      CHIEF OF   ENGINEERS,    U.   S. ARMY,   1934


amount expended on previous project, was $27,450.             No estimate for
the balance of the project was made, but the act of March 2, 1907,
appropriated $60,000 for the work. The estimated cost for mainte-
nance is about $20,000 every 5 years, or an annual average of $4,000.
   The existing project was authorized by the following river and
harbor acts: The act of June 13, 1902, provided for the channel at
East Pass and the work at Dog Island (H. Doc. No. 63, 56th Cdng.,
1st sess.) ; the act of March 2, 1907, provided for the other work in
the project without any prior report having been made thereon.
The latest published map is found in House Document No. 227,
Fifty-sixth Congress, second session.
   Terminal facilities.-None, other than boat landings built along
the water front on piles bulkheaded and filled in. They answer the
purpose, and no better facilities are required.
   Operations and results during fiscal year.-None. The expendi-
tures were $2,427.55 applied to outstanding liabilities from the pre-
ceding fiscal year.
   Condition at end of fiscal year.-The opening in Dog Island had
been closed. The part of the project pertaining to the channel across
the bars at East Pass was completed in 1909; that pertaining to the
10-foot channel was completed in 1909; that pertaining to the 18-
foot channel was completed in 1913. The turning basin has not
been made. The project is 97 percent completed. On June 30, 1934,
the controlling depths were as follows: For the 10-foot channel, 11.0
feet; for the 18-foot channel, 14.0 feet; for the bars at East Pass,
19.0 feet. The costs were $57,353.04 for new work and $163,043.67
for maintenance, a total of $220,396.71. The total expenditures were
$220,423.41.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $72.45, together with an allotment of $15,000 made dur-
ing July 1934, will be applied as follows:
Maintenance:
    Dredging bar channel with a sea-going hopper dredge, 1/2 month
      (August 1934), at $20,000 per month---------------------- $10, 000. 00
    Dredging river channel with U. S. dredge Muscogee, 1 month
      (October   1934),    at $5,000 per month__                           5, 072. 45

        Total                                                              5, 072. 45
                                                                          1---------------------------
  The additional sum of $5,000 can be profitably expended during
the fiscal year 1936 on maintenance dredging of the river channel
using a pipe-line dredge 1 month.
                            Cost and financial sunnmmary

Cost of new work to June 30, 1934_                                    $79, 057. 12
Cost of maintenance to June 30, 1934_                                 163, 043. 67

      Total cost of permanent work to June 30, 1934------------       242, 100. 79
Value of plant, materials, etc., on hand June 30, 1934------------          26. 70

      Net total cost to June 30, 1934----------------------------242, 127. 49
                      -----------------------------------------
Net total expenditures_                                          242, 127. 49
Unexpended balance, June 30, 1934 ------------------------------       72. 45
      Total amount appropriated to June 30, 1934--...                 242, 199. 94
                  RIVERS           AND HARBORS--MOBILE,                             ALA.,       DISTRICT                        533

           Fiscal year ending June 30                   1930              1931             1932             1933              1934


Cost of new work                                                                                                        ------------------
Cost of maintenance ------------                 --   $5, 984. 50 --                -------------        $10, 015. 47              -----
Total expended-----------..   -     -    -   -   -     5, 984. 50                                          7, 614. 62       $2, 427. 55
Allotted                                               6, 000. 00 -----          ------------             10, 911. 55         -796. 93


Balance unexpended July 1, 1933___________-________-----                                                                $3, 296. 93
Deductions on account of revocation of allotment ___------7--                                                  .            796. 93

      Net amount to be accounted for __________----------- --                                                            2, 500. 00
Gross amount expended_______ ________-____________                                                  __                   2, 427. 55

           Balance unexpended June 30, 1934--------------------------                                                         72. 45

Amount that can be profitably expended in fiscal year ending June
                                                       - -- -- - -- -- -
30, 1936, for maintenance 1 - - - - - - - - - - - - -                                                                   5, 000.00

                                        2. APALACHICOLA BAY, FLA.

   Location.-This bay is situated on the coast of northwest Florida
160 miles east of Pensacola Harbor. (See U. S. Coast and Geodetic
Survey Chart No. 183.)
   Previous projects.-Adopted in the River and Harbor Act of June
14, 1880, and the act approved March 3, 1899, amended and extended
it. The total cost and expenditure on the original and amended
projects since 1833 were $303,379.26, of which $134,613.50 was for
new work and $168,765.76 for maintenance. (For further details
see p. 1833, Annual Report for 1915.)
   Existing project.-This provides for a channel from the Gulf of
Mexico 10 feet deep at mean low water and 150 feet wide through
West Pass and Link Channel and 100 feet wide thence to the town
of Apalachicola, and for a channel 9 feet deep and 100 feet wide
through Bulkhead Shoals.
   The mean range of tide throughout this harbor is 2 feet. The
extreme range, except during storms, is about 3 feet.
   The estimate of cost of new work, revised in 1927, was $82,144,
exclusive of amounts expended on previous projects. The latest
 (1927) approved estimate of annual cost of maintenance is $14,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 2, 1907, provided for a channel 18
feet deep through West Pass and Link Channel, 10 feet deep across
the bar, and 9 feet through Bulkhead Shoals (H. Doc. No. 422, 59th
Cong., 1st sess.); and the act of January 21, 1927, provided for the
present dimensions of the project (H. Doc. No. 106, 69th Cong., 1st
sess.). The latest published map is in the last-mentioned document.
   Terminal facilities.-None other than small marginal wharves for
river boats and coastwise traffic built along the water front on piles,
bulkheaded and filled in. They answer the purpose, and no better
facilities are required.
   Operations and results during fiscal year.-The U. S. hopper
dredge Absecon carried on dredging operations from March 19 to
  1   Exclusive of available funds.
534          REPORT OF CHIEF OF ENGINEERS,                                      U.      S. ARMY                   1934


March 26, removing 5,827 cubic yards of material from West Pass
Channel. The U. S. pipe-line dredge Mascogee carried on dredging
operations in the river bar channel from May 9 to June 30, remov-
ing 157,993 cubic yards of material. The cost was $18,214.25,
charged to maintenance.                          The expenditures were $11,148.86.
   Condition at end of fiscal year. The existing project, as modified
in 1927, has been completed. A timber bulkhead, 9,874 feet long,
was constructed to protect the already completed 10-foot channel
at the mouth of Apalachicola River. This bulkhead was destroyed
during 1916 by two severe storms and has never been rebuilt. The
controlling depths on June 30, 1934, were as follows: River bar
channel, 7.5 feet; St. Georges Channel, 7.5 feet; Link Channel,
10.0 feet; West Pass, 10.0 feet; and Bulkhead Shoals, 7.5 feet. The
total costs under the existing project were $546,557.39, of which
$82,144.59 was for new work and $464,412.80 for maintenance. The
total expenditures were $539,217.03.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $28,286.76, will be applied as follows:
Accounts payable June 30, 1934 _________________--_______                                                                   $7, 340.36
Maintenance:
    Dredging in restoration of project dimensions in
      the river bar channel with U. S. pipe-line dredge
      Musoogee, 1 month (July 1934) ------------------ $8, 500. 00
    Dredging bulkhead channel with U. S. pipe-line
      dredge Muscogee, 1 month (August 1934) --------    , 000. 00
    Dredging West Pass Channel entrance with a U. S.
      hopper dredge, 1 month (October 1934)----------6, 446.40
                                                                                                                  -         20, 946.40

          Total---------------------------------------------------                                                          28,286. 76
  The additional sum of $20,000 can be profitably expended during
the fiscal year 1936, for dredging in the river bar channel, employing
the U. S. pipe-line dredge Muscogee during March and April 1936.
                                              Cost and financial summary
Cost of new work to June 30, 1934 _ __                                   _----------                                   $216, 758. 09
'Cost of maintenance to June 30, 1934_                              --          -          -          -                 633, 178. 56

      Total cost of permanent work to June 30, 1934_                                                      -             849, 936. 65
Minus accounts payable June 30, 1934---------------------------                                                           7, 340. 36
      Net total expenditures---  -                                  -           -                         -_            842, 596. 29
TJnexpended balance June 30, 1934_                                                                                       28, 286. 76
          Total amount appropriated to June 30, 1934--------------                                                      870, 883. 05

          Fiscal year ending June 30                     1930            1931             1932                  1933            1934

Cost of new work..---------.............                                   ------------
                   .
Cost of maintenance-----------                       $52, 736. 04   $31, 863. 68       $25, 244. 25       $29, 345. 00        $18, 214. 25
'Total expended..     --      ----------------        56, 431. 19    32, 496. 24        25, 384. 48           28, 929. 80      11, 148. 86
Allotted------       ----------------------           66, 000. 00    22, 500. 00         5, 000. 00           52, 914. 63      13, 999. 63
               RIVERS AND HARBORS-MOBILE,       ALA.   DISTRICT          535

Balance unexpended July 1, 1933__---------------------------$25,435.99
Amount allotted from War Department Appropriation Act approved
  April 26, 1934   ------------------------------------------ 14, 000. 00

     Amount to be accounted for-----------------  ---------- 39, 435. 99
Deductions on account of impounded funds revoked---------            .37

      Net amount to be accounted for -----                        39, 435. 62
                                                     -__--_________
Gross amount expended------------------------- $11, 152.61
Less reimbursements collected__________________-----        3. 75
                                                                  11, 148. 86

      Balance unexpended June 30, 1934----------------------        28, 286. 76
Outstanding liabilities June 30, 1934--------------------------      7, 340. 36
       Balance available June 30, 1934___---                        20, 946. 40

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance ________________-       _____----        20, 000. 00

3. APALACHICOLA           RIVER, FLA., THE CUT-OFF, LEE      SLOUGH, AND
                             LOWER CHIPOLA RIVER

   Location.-The Apalachicola River is formed at the southwest
corner of the State of Georgia by the junction of the Chattahoochee
and Flint Rivers and flows south a distance of 112 miles, emptying
into Apalachicola Bay. (See U. S. Coast and Geodetic Survey Chart
No. 183.)
   Previous projects.-The sum of $13,000 represents the cost and
expenditures between 1828 and 1831, but apparently under no definite
project. In the years 1835 and 1836 appropriations amounting to
$9,000 were made for the Chipola River. Work under existing
project was begun in 1875.
   Existing project.-This provides for a channel in the Apalachicola
River 6 feet deep at low water and 100 feet wide, to be secured by
the removal of snags and overhanging trees and by widening and
straightening Moccasin Slough, and for a channel 5 feet deep and
60 feet wide through the cut-off, Lee Slough, and lower Chipola
River. The mean range of the tide at the mouth of Apalachicola
River is 2 feet, and the variation between low and high water is
about 30 feet at the point where the river is formed. The estimate
of cost of new work, revised in 1923, was $106,000, exclusive of
amount expended on previous project. The latest (1928) approved
estimate of annual cost of maintenance is $15,000.
   The existing project was authorized by the following river and
harbor acts: The act of June 23, 1874, provided for the channel in
the Apalachicola River (H. Doc. No. 241, 42d Cong., 2d sess., and
Annual Report for 1873, p. 698) ; the act of June 13, 1902, provides
for the work in the cut-off, Lee Slough, and lower Chipola River
 (Annual Report for 1889, p. 1416). No map of Apalachicola River
has been published in congressional documents. A map of the cut-
off, Lee Slough, and lower Chipola River will be found in the Annual
Report for 1891 opposite page 1696.
   Supplementing the work authorized by Congress, the dredging and
snagging of the Styx River was included in the Public Works pro-
gram under the National Industrial Recovery Act.
  1Exclusive   of available funds.
536      REPORT     OF CHIEF     OF ENGINEERS,          U.   S.   ARMY,   1934


   Terminal facilities.-At Apalachicola, Fla., the facilities consist
of six wharves built on piling with wooden framework. The land-
ing at Blountstown, Fla., is a natural one, provided with a ware-
house, open to all carriers. The landing at River Landing, Fla.,
is a natural one, used in connection with a warehouse erected on
trestlework, and the freight is handled by double-track hoist. These
facilities are considered adequate for existing commerce.
   Operations and results during fiscal year.-The U. S. pipe-line
dredge Muscogee, operating in the Apalachicola River channel from
August to October 1933, removed 35,811 cubic yards of material.
The U. S. snagboat Albany, working in the Apalachicola River, re-
moved 212 obstructions. The cost was $14,019.35, charged to mainte-
nance. The expenditures were $13,982.71, all regular funds.
   From the River Styx channel, a tributary of the Apalachicola
River, Fla., the U. S. pipe-line dredge Muscogee removed 4,506 cubic
yards of material and the U. S. snag boat Albany removed 50 ob-
structions. The work was accomplished under authority contained
in section 3 of the River and Harbor Act of July 3, 1930. The
cost of this work, $1,000, is included in the cost shown above.
   Supplementing the work authorized by Congress dredging and
snagging on the River Styx channel was authorized by the Federal
Emergency Administration of Public Works. The U. S. pipe-line
dredge Muscogee removed 889 snags from the charinel, 2,015 trees cut
from the channel and banks, and 29,303 cubic yards of mud from
the channel. Cost during the fiscal year, amounting to $14,335.12
from Public Works funds, was charged to new work. The total
expenditures were $14,335.12. The total cost, all funds, was $28,-
354.47, of which $14,335.12 was for new work and $14,019.35 for
maintenance. The total expenditures were $28,317.83.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1924. At the end of the fiscal year the contraction works
were in fair condition. The controlling depth is 5 feet. Boats draw-
ing 5 feet can operate throughout the year at a stage of zero on the
River Junction gage. Greater drafts are available usually from
January to July of each year. The total cost under the existing
project was $270,582.74, of which $108,463.09 was for new work and
$162,119.05 for maintenance. The total expenditures were $270,-
582.74. In addition, the cost and expenditures for new work on
River Styx from Public Works amounted to $14,335.12.
   Proposed operations.--No funds are available.
   The sum of $15,000 can be profitably expended during the fiscal
year 1936 for snagging operations, employing the U. S. snag boat
Albany during September, October, and November 1935.
                            Cosrt and financial summary

                      MAINTENANCE    AND IMPROVEMENT         FUNDS


Cost of new work to June 30, 1934___________________________               $121, 463.69
Cost of maintenance to June 30, 1934_________________--____                 162, 119. 05

      Total cost of permanent work to June 30, 1934-------------283,             582. 74
Net total expenditures ___-----_-__--_-----------283,                            582. 74
Total amount appropriated to June 30, 1934___                               283, 582. 74
                     RIVERS AND HARBORS-MOBILE,                                          ALA.,      DISTRICT                            537

              Fiscal year ending June 30                        1930              1931       1932           1933                  1934

Cost ofnew work .-------------                       -
Cost of m aintenance --                                    -              $10, 000. 00       --                                $14, 019. 35
                                                                                                                            ._---_---

Total expended                  -                                           10, 000. 00 --                   $36. 64             13, 982. 71
Allotted---     -------------- ---       ---------       $10,00000------------------------                 9, 998. 00             4, 021. 35


Balance unexpended July 1, 1933 ---------------------------------                                                           $9, 961: 36
Amount allotted from War Department Appropriation Act ap-
proved Mar. 4, 1933__ ____________________________--                                                                         4,085. 22

     Amount to be accounted for___ _-___       _______ __--                                                                 14, 046. 58
Deductions on account of revocation of impounded funds                                                                            3. 87
                                                                                                                                 6---------

      Net amount to be accounted for _________________                                                  ___                 13, 982. 71
Gross amount expended___________________________ ____                                                                       13, 982. 71

Amount that can be profitably expended in fiscal year ending June
                              --------------------------------
30, 1936, for maintenance_____                                                                                             15, 000. 00

                                                PUBLIC WORKS FUNDS

Cost of new -vork to June 30, 1934----------------------------                                                              14, 335. 12
Cost of maintenance to June 30, 1934__

              Total cost of permanent work to June 30, 1934____________                                                     14, 335. 12

Net total expenditures_ _  ______--___---                                      ______                 _- -                  14, 335. 12
Unexpended' balance June 30, 1934                                            ______                                             664. 88

              Total amount appropriated to June 30, 1934____________                                                         15, 000. 00

              Fiscal year ending June 30                        1930              1931       1932           1933                  1934


Cost ofnew work ...-                                                                                                            $14,335.12
Cost of m aintenance -- - -         - - -    - - -       -- -     - - -   - --.                             .      -              - -

Totalexpended----.           ---------                                                                                  -        14;335.12

Allotted-                                                                                              -                         15, 000. 00


Amount allotted from National Industrial Recovery Act approved
  June 16, 1933-----------------------------------------                                                                $15, 000. 00
Gross amount expended__ _______-_____                          __-- $14, 471. 17
Less reimbursements collected_-----                      ____----        136. 05
                                                                                                                            14, 335. 12

      Balance unexpended June 30, 1934__________________-__                                                                      664. 88
Outstanding liabilities June 30, 1934____________________ ___-                                                                   139. 76

              Balance available June 30, 1934__________________________                                                          525. 12

     CONSOLIDATED COST AND FINANCIAL SUMMARY FOR APALACHICOLA RIVER, ETC.

Cost of new work to June 30, 1934________________--_______ _ 135, 798. 81
Cost of maintenance to June 30, 1934_-_____ _______--------162, 119. 05
              Total cost of permanent work to June 30, 1934___________                                                  297, 917. 86

Net total expenditures--                      -------------------------------                                           297, 917. 86
Unexpended balance June 30, 1934 __----------                                                                          -         664. 88
              Total amount appropriated to June 30, 1934-                                       __
                                                                                              ----                      298, 582. 74
538            REPORT OF CHIEF                       OF          ENGINEERS, U.                   S. ARMY,             1934


          Fiscal year ending June 30                             1930               1931          1932         1933            1934


Cost of new work------.                                                                                                      $14,335. 12
Cost of maintenance ....             ...-------
                                      -----------------..                      $10, 000. 00                                   14, 019. 35
        Total cost---.--..   -----.--------      ------      -    --             10, 000. 00               .....-.-           28, 354. 47
Total expended ...-------------                --------                ..----------10, 000. 00                   $36. 64      28, 317. 83

Allotted---------------------------......                   $10, 000. 00                 -------- --
                                                                             ----------........              9, 998. 00       19, 021. 35


Balance unexpended July 1, 1933___--------       ___----------                                                             $9, 961. 36
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933__------------------          $4, 085.22
Amount allotted from National Industrial Recovery Act
  approved June 16, 1933------------------------           5, 000.00
                                                                                                                           19, 085.22

     Amount to be accounted for-......___---    ___ -     -
                                                        ___-  -                                                            29, 046. 58
Deductions on account of revocation of impounded funds---------                                                                 63.87

       Net amount to be accounted for___ - __-__-__-______-28,                                                                982. 71
                         ....
Gross amount expended___--          __...___-            $28, 453. 88
Less reimbursements collected                                  136. 05
                                                                                                                           28, 317. 83

      Balance unexpended June 30, 1934                                           ___________             ___664.                   88
Outstanding liabilities June 30, 1934_ ..                                        .__      __-                                 139. 76
           Balance available June 30, 1934-____________________                                                               525. 12

Amount that can be profitably expended in fiscal year ending June
   30, 1936, for maintenance 1                                    _                  _                                     15, 000. 00,

4. UPPER CHIPOLA RIVER, FLA., FROM MARIANNA                                                                TO ITS MOUTH

  Location.-This river rises in the southeast portion of the State
of Alabama and flows in a general southerly direction through Ala-
bama and northwest Florida for a distance of about 125 miles, empty-
ing into Apalachicola River through Lee Slough and lower Chipola
River. (See U. S. Geological Survey charts for west Florida.)
  Previous projects.-In 1835 and 1836 appropriations totaling $9,000
were made for the Chipola River, but there is no record of the
expenditure of this sum. Work under existing project was begun
in 1900.
  Existing project.-This provides for securing a channel 3 feet deep
at low water and 60 feet wide from the foot of the Dead Lakes to
Marianna, a distance of 55 miles, by rock excavation and snagging.
The variation between low and high water is approximately 14 feet.
The original estimate for new work, made in 1888, was $41,000,
exclusive of the cost of necessary plant. The latest (1928) approved
estimate of annual cost of maintenance is $5,000.
   The existing project was authorized by the River and Harbor Act
of March 3, 1899. (Annual Report for 1899, p. 1416.) No map of
the upper Chipola River has been published in any congressional
documents or annual report.
   Recommended modifications of project.-The project has been rec-
ommended for abandonment. (H. Doc. No. 467, 69th Cong., 1st sess.)
   1
       Exclusive of available funds.
                 RIVERS AND HARBORS--MOBILE,                                         ALA.,      DISTRICT                         539
   Terminal facilities.--None, other than natural landings for river
boat traffic. These landings answer the purpose, and no better facili-
ties are required.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The project has been completed
from Look and Tremble Shoals to the mouth. Practically no work
has been done at Look and Tremble Shoals, or from that point to
Marianna, a distance of approximately 20 miles. The existing proj-
ect is about 75 percent completed. The controlling depth at the end
of the fiscal year, up to Look and Tremble Shoals, the present head
of navigation, is 3 feet, which depth is available throughout the
year. Greater depths are usually available from January to June.
The channel from the head of Dead Lakes to the steel bridge at Mile
30 is badly obstructed by snags. There is a gage on this stream above
Look and Tremble Shoals near Altha, Fla. The work remaining to
complete the project is the improvement from and including Look
and Tremble Shoals to Marianna. The costs and expenditures have
been $36,781.12 for new work and $55,193.43 for maintenance, a
total of $91,974.55.
   Proposed operations.-No funds are available.
   The sum of $4,000 can be profitably expended during the fiscal year
1936 for snagging operations, employing the U. S. snag boat Albany
during August 1935.
                                        Cost a/nd financial summary

Cost of new work to June 30, 1934------------------------           $36, 781.12
Cost of maintenance to June 30, 1934       ------------------------ 55, 193. 43
      Total cost of permanent work to June 30, 1934------------                                                           91, 974. 55
Net total expenditures------------------------------------                                                                91, 974. 55
Total amount appropriated to June 30, 1934_                                                                               91, 974. 55

        Fiscal year ending June 30                            1930           1931         1932                1933             1934


Cost of new work___ -
Cost of maintenance
                        -     -   -     -.        -
                            -----------------------------
                                                            -.-.-               -...-
                                                                             $12, 000        _-
                                                                                                         -.-
                                                                                                              __
                                                                                                             -----       ------
                                                                                                                           __ _ ---
                                                                                                                                          ..

Total expended   --------------------------                          -----    12, 000--
Allotted.......---------------------------$9, 525. 45                         12, 000        ....---.----.       -----            ..- .


Amount that can be profitably expended in fiscal year ending June 30,
193, for maintenance     --------------------------------------      $4, 000
   5. CHANNEL FROM APALACHICOLA RIVER TO ST. ANDREWS BAY,
                            FLA.

  Location.-This waterway extends from a point 6 miles above the
mouth of the Apalachicola River in a northwesterly direction to St.
Andrews Bay, Fla. (See U. S. Coast and Geodetic Survey Chart
No. 184.)
  Existing project.-This provides for a canal 5 feet deep at mean
low water and 65 feet wide at the bottom from Apalachicola River
to St. Andrews Bay by way of the natural waterways indicated
above. Dredging was required over a distance of about 23 miles,
540              REPORT OF                CHIEF OF ENGINEERS,                           U.     S.    ARMY,         1934

the depth of cut ranging from 1 foot to 18 feet. The mean range
of tide is 2 feet and the extreme range, except during storms, 3 feet.
The estimated cost of new work, made in 1910, was $450,000. The
latest (1928) approved estimate of annual cost of maintenance is
 $3,000, but as work is not necessary each year, maintenance is al-
lowed to accumulate, requiring an expenditure of about $15,000
every 5 years.
    The existing project was authorized by the River and Harbor Act
of June 25, 1910 (H. Doc. No. 670, 61st Cong., 2d sess.). The latest
published map of this waterway is printed in Rivers and Harbors
Committee Document No. 52, Seventy-second Congress, first session.
   Recommended modifications of project.-Under date of December
30, 1932, the Chief of Engineers recommended modification of the
existing project so as to provide for a channel 9 feet deep and 100
feet wide from Apalachicola River to St. Andrews Bay, with 3
cut-offs and 3 easements, at an estimated cost of $340,000, with
 $1,000 annually for maintenance in addition to that now required,
subject to certain conditions of local cooperation (Rivers and Har-
bors Committee Doc. No. 52, 72d Cong., 2d sess.).
   Operations and results during fiscal year.-The U. S. snagboat
Albany, operated by hired labor, carried on snagging operations
from April 16 to May 31, 1934, removing 887 obstructions. The cost
of this work, $6,534.04 was charged to maintenance. The expendi-
tures were $7,118.55.
   Condition at end of fiscal year.-The project was completed in
1915. On June 30, 1934, the controlling depth was 5 feet over the
project width. The total cost under the existing project was $602,-
195.80, of which $505,930.01 was for new work and $96,265.79 for
maintenance. The total expenditures were $602,195.80.
   Proposed operations.-No funds are available and no work is con-
templated during the fiscal year ending June 30, 1935.
   The sum of $15,000 can be profitably expended during the fiscal
year 1936, employing the U. S. pipe-line dredge Muscogee, 11/2
months during July and August 1935, to restore project dimensions.
                                                  Cost and financial sumnmary

Cost of new work to June 30, 1934_________                    $505, 930. 01
Cost of maintenance to June 30, 1934-------------------------   96, 265. 79

          Total cost of permanent work to June 30, 1934                                                                      195. 80
                                                                                                                       6------------02,

Net total expenditures -----------                                                                                           195. 80
                                                                                                                       6-----------------------602,
Unexpended balance June 30, 1934 ___                                                    ---------                         2, 427. 38

          Total amount appropriated to June 30, 1934________________                                                   604, 623. 18

          Fiscal year ending June 30                        1930             1931               1932           1933              1934


Cost of new work --                     --                                      --                                         --
Cost of maintenance__         _              --             --           $10, 989. 39        $21, 619. 01   $47, 889. 58        $6, 534. 04
       Total expended-         ----------------- $1, 554. 04              10, 989. 39         11, 320. 57    57, 603. 51         7, 118. 55
Allotted_--_--     .....-----------...--...---           -- 1, 000. 00     5, 000. 00         40, 000. 00    29, 970. 01         8, 500. 00:
                RIVERS       AND HARBORS-               VOBILE,       ALA., DISTRICT                    541
Balance unexpended July 1, 1933-        _____ ____________ $1, 045.93
Amount allotted from War Department Appropriation Act
  approved Apr. 26, 1934                               $1, 000. 00
Amount allotted from War Department Appropriation Act
  approved Mar. 4, 1933-------------------------------7, 500. 00
                                                                   8, 500.00
      Amount to be accounted for-            ---------                                             9, 545. 93
Gross amount expended-------------------------------                                               7, 118. 55
         Balance unexpended June 30, 1934-----                                                     2, 427. 38

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1- - - - - - - - - - - - - - - - - - - - - - - - -_- - - - - - - - - - - 15, 000. 00
                                 6. ST. ANDREWS BAY, FLA.

   Location.-This bay is located on the northwest coast of the State
of Florida, 110 miles east of the entrance to Pensacola Harbor.
 (See U. S. Coast and Geodetic Survey Chart No. 184.)
   Existing project.-This provides for a channel 22 feet deep at
mean low water and 200 feet wide through East Pass from the Gulf
of Mexico to St. Andrews Bay. The length of the channel to be
dredged on the outer bar through East Pass was 10,000 feet, while
through Camel Back Shoal the distance was 6,000 feet. The mean
tidal range is 1.4 feet, and the extreme range, except during storms,
is about 4. feet. The estimated cost of this project, made in 1909,
was $203,560 for new work. The latest (1928) approved estimate of
annual cost of maintenance is $25,000.
   The existing project was authorized by the River and Harbor Act
of June 25, 1910 (H. Doc. No. 12, 61st Cong., 1st sess.). The latest
published map of St. Andrews Bay will be found in House Docu-
ment No. 33, Seventy-third Congress, first session.
   Supplementing the work authorized by Congress the construction
of a new channel extending from deep water in the bay across Lands
End to the Gulf of Mexico to be. 300 feet wide and 27 feet deep in
the bay and across Lands End, and 450 feet wide and 29 feet deep
in the approach channel in the Gulf, protected by two jetties each
about 700 feet long as recommended by the Chief of Engineers in
House Document No. 33, Seventy-third Congress, first session, has
been included in the Public Works program under the National In-
dustrial Recovery Act.
   Recommended modifications of project.-Included under Public
Works program.
   Local cooperation.-The work to be carried out under the Public
Works program is subject to the conditions that local interests shall
furnish assurances satisfactory to the Secretary of War that they
will construct an adequate deep-water terminal, and shall furnish,
free of cost to the United States, all rights-of-way required for the
improvement and suitable areas for disposal of dredged material
during initial construction and future maintenance as and when
needed. The conditions relative to the furnishing of all rights-of-
way are being complied with.
  1Exclusive     of available funds.
542    REPORT OF    CHIEF OF ENGINEERS,     U.   S.   ARMY,   1934


  Terminal facilities.-There are numerous small wharves located
on St. Andrews Bay, and one concrete-steel pier at Bay Harbor,
owned by the municipality of Panama City, Fla.
            OPERATIONS AND RESULTS DURING FISCAL YEAR

   Project adopted by Congress.-The U. S. hopper dredge Absecon
and the U. S. dredge Benyaurd carried on dredging operations dur-
ing August and September 1933 in East Pass Channel and Gumps
Range Cut Channel, resulting in the removal of 246,795 cubic yards
of sand and mud. The cost of this work, all for maintenance, was
$14,966.29. The expenditures were $15,409.55, all regular funds.
   Project authorized by Public Works Administration.-Supple-
menting the work authorized by Congress, the construction of a new
channel with Public Works funds, extending from deep water in the
bay across Lands End to the Gulf of Mexico, to be protected by two
jetties, was commenced. Under contract the dredge Tchefuncta,
operating from the north end of the new entrance channel toward
the Gulf of Mexico, removed 2,777,686 cubic yards of material, all
new work, from October 26, 1933, to June 30, 1934. The contract on
June 30, 1934, was 98.64 percent completed, based on contract quan-
tities. The cost for dredging was $204,024.06. In the construction
of the protective jetties the contractor drove 3,794.10 square feet of
15-foot steel sheet piling; 4,063 square feet of 20-foot steel sheet
piling; 13,610.70 square feet of 30-foot steel sheet piling; and 15,676
square feet of 40-foot steel sheet piling, from November 20, 1933, to
March 31, 1934. During the period November 20, 1933, to June 30,
1934, 1,339.85 tons of apron stone, 7,364.70 tons of foundation riprap
stone, 10,353.70 tons of core stone, and 12,234.85 tons of cover stone,
were placed. The jetties were completed on June 20, 1934, at a cost
of $267,514.07. The total cost of this work, all charged to new work,
was $471,538.13. The total expenditures were $440,921.04.
   Condition at end of fiscal year.-The project adopted by Congress
was completed in 1914. The usual easterly shoaling of the Hurricane
Island Shoal was continued, shifting the deep water to the eastward
of the original channel location, and causing a curve in the course of
the channel at this point. On June 30, 1934, the project depth existed
throughout the entire channel. The total cost was $717,164.67, of
which $203,560 was for new work, and $513,604.67 for maintenance.
The total expenditures were $717,162.67. Under the Public Works
program the cost for new work was $471,538.13 and the expenditure
was $440,921.04, all from Public Works funds.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $42,576.38, will be applied to maintenance dredging in
the new entrance channel to restore project dimensions, employing a
United States sea-going hopper dredge, for a period of 11/3 months,
during November and December 1934.
   The balance unexpended at the end of the, fiscal year, $139,733.96,
allotted from funds made available by the National Industrial Re-
covery Act of June 16, 1933, will be applied as follows:
                     RIVERS AND HIIARBORS-MOBILE,                                     ALA., DISTRICT                          543
Accounts payable, June 30, 1934--------------------------- $30, 617. 09
New work:
    Dredging new entrance channel inside bay and
      through peninsula, contract, July 1934-- -------  $38, 865. 14
    Rental dredge Tchefuncta to remove plug to 15-foot
      depth, August-September 1934----------------27, 600. 00
    Construction of 2 composite jetties at entrance,
      July 1934---------------------------------- 1, 200. 00
    Dredging of new entrance channel by a United
      State hopper dredge (Sept. 1-Oct. 31, 1934) -----  28, 250. 73
    Dredging half a month in cleaning up with a United
      States hopper dredge, November 1934---------       13, 201.00
                                                                     109, 116. 87
           Total-               -------------------------------------------                                         139, 733.96
  The additional sum of $40,000 can be profitably expended during
the fiscal year 1936, to be applied to the operation of a United States
sea-going hopper dredge to restore project dimensions: in the new
entrance channel.
                                              Cost and financial summary

                                     MAINTENANCE              AND IMPROVEMENT              FUNDS

Cost of new work to June 30, 1934-----------------------$203, 560.00
Cost of maintenance to June 30, 1934----------------------- 513, 604. 67
      Total cost of permanent work to June 30, 1934-----------717, 164. 67
Minus accounts payable June 30, 1934----------------------------     2. 00
     Net total expenditures----- -- ---------------------- 717, 162. 67
Unexpended balance June 30, 1934-------------------------42, 576. 38
            Total amount appropriated to June 30, 1934---------------759, 739.05

            Fiscal year ending June 30                          1930           1931           1932           1933            1934


Cost of new work-------..                -----------------------------------------------------                               --
Cost of maintenance----            ---     -----------      $33, 511. 01   $29, 350. 70   $35, 303.19    $37, 888.15      $14,966. 29

Total expended---------------------                          27, 359. 18    31, 002. 53    37, 162. 83    38, 246. 54      15, 409. 55
Allotted...........------------.......-------------------    35, 000. 00    45, 000. 00   -9, 000. 00     54, 870. 19      26, 308. 86


Balance unexpended July 1, 1933 -------------------------      $31, 677. 07
Amount allotted from War Department Appropriation Act approved
  Apr. 26, 1934----    --------------------------------------    37, 600. 00
      Amount to be accounted for__--------------------------9, 277. 07
Deductions on account of revocations of allotment_         11, 291. 14

       Net amount to be accounted for----------------------                                                              57, 985. 93
Gross amount expended------------------------- $15, 595. 17
Less reimbursements collected------------------------  185. 62
                                                                                                                         15, 409. 55

       Balance unexpended June 30, 1934                            42, 576. 38
Outstanding liabilities June 30, 1934 ----------------------------      2. 00

             Balance available June 30, 1934-----------------------42, 574.38

  Amount that can be profitably expended in fiscal year ending
   June 30, 1936, for maintenance _1 -------          -_                                                                 40, 000. 00
      1Exclusive of available funds.
          91536--ENo 1934-35
544.        REPORT OF CHIEF                 OF ENGINEERS,                    U. S. ARMY,                    1934

                                           PUBLIC WORKS FUNDS


                                       ---
Cost of new work to June 30, 1934________  ______----
                                              --       -                                                       $471, 538.13
Cost of maintenance to June 30, 1934__________________
     Total cost of permanent work to June 30, 1934------------                                                  471, 538. 13
Minus accounts payable June 30, 1934______________________                                                       30, 617.09

     Net total expenditures------------------------------                                                       440, 921.04
Unexpended balance June 30, 1934-------------------------                                                       139, 733.96

         Total amount appropriated to June 30, 1934______________                                               580, 655.00

        Fiscal year ending June 30                   1930             1931              1932            1933          1934


Cost of new work ..                       ..        .                            .          .      .      $471, 538. 13
Cost of maintenance .-----------------------------------                                    ----------------------
Total expended---                                    ------------------------------                     -           440, 921.04
Allotted-------           --------------      ---------         --------------        ------------------ ----       580, 655.00


Amount allotted from National Industrial                               Recovery Act ap-
  proved June 16, 1933__-__                                                                                    $580, 655.00
Gross amount expended_________                                                       $440,9'80.35
Less reimbursements collected_---_____----                              ____                59. 31
                                                                                                                440, 921.04

         Balance unexpended
Outstanding liabilities
                                           June 30, 1934 -------------
                                  June 30, 1934-----
                                                                                            ___-                139, 733.96
                                                                                                                  30, 617. 09

         Balance available June 30, 1934 .                              -        --                             109,116. 87
     CON SOLIDATED COST AND FINANCIAL SUMMARY FOR ST. ANDREWS, BAY, FLA.

Cost of new work to June 30, 1934___                                                                           $675, 098.13
Cost of maintenance to June 30, 1934___                                                                         513, 604. 67
      Total cost of permanent work to June 30, 1934 .......                                                  1, 188, 702. 80
Minus accounts payable June 30, 1934_--                                                                          30, 619. 09
         Net    total expenditures__________________                                 _____                   1, 158, 083. 71
Unexpended balance June 30, 1934__                                                                              182, 310.34
         Total amount appropriated to June 30, 1934------------                                              1, 340, 394. 05

         Fiscal year ending June 30                  1930             1931              1932            1933          1934


Cost of new work----
                 .-..                                                     _-_-_-_------------- ----                $471, 538.13
Cost of maintenance------------------           $33, 511. 01      $29, 350. 70 $35, 303. 19 $37, 888. 15             14, 966. 29
      Total cost----------------------33, 511. 01                  29, 350. 70          303. 19
                                                                                      35,           37, 888. 15     486, 504. 42
Total expended-----------------------             27, 359. 18      31, 002. 53        37, 162. 83   38, 246,54      456, 330. 59
Allotted.........----------------------------       000. 00
                                                  35,                000. 00
                                                                   45,               -9, 000. 00    54, 870. 19     606, 963. 86

Balance unexpended, July 1, 1.933------------------------------ $31, 677.07
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934------------------------ $37,600. 00
Amount allotted from National Industrial Recovery Act
  approved June 16, 1933------   __     ----
                                          _____ ______ 580,655.00
                                                                  618,255. 00
      Amount to be accounted for_.     -                                                                        649',932.07
Deductions on account of revocation of allotment                                               .    -            11, 291. 14

         Net amount to be accounted for_-----------                                                          _ 638,640. 93
                 RIVERS AND IARBORS--MOBILE,        ALA., DISTRICT               545

Gross amount expended----------------------------        $456, 575. 52
Less reimbursements collected-----------------------           244. 93
                                                                    -    $456, 330. 59


      Balance unexpended, June 30, 1934-------- ---------------- 182, 310. 34
Outstanding liabilities, June 30, 1934---------------------------- 30, 619. 09

       Balance available, June 30, 1934   ----------------------          151, 91.25

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1------------------------------------            40, 000. 00

                   7. NARROWS IN SANTA ROSA SOUND, FLA.

   Location.-This is a narrow body of water about 34 miles in
length, with a width ranging from 11/2 miles at its junction with
Pensacola Bay on the west to a width of about 150 yards at the east
end, where it joins Choctawhatchee Bay. (See U. S. Coast and
Geodetic Survey Chart No. 186.)
   Existing project.-This provides for a channel 6 feet deep at mean
low water with no reference to width. This project includes dredg-
ing a channel 3,000 feet long through the bar at the entrance of the
narrows into Choctawhatchee Bay and various other short channels
into Santa Rosa Sound, aggregating a total of 9,200 feet additional.
The mean range of tide in the sound is 1.4 feet. The extreme range,
except during storms, is about 3 feet. The estimated cost of new
work was $24,000. The estimated cost of maintenance is $2,000 per
annum.
   The existing project was authorized by the River and Harbor Act
approved June 25, 1910 (H. Doe. No. 565, 61st Cong., 2d sess.).
The latest published map is printed in Rivers and Harbors Com-
mittee Document No. 42, Seventy-third Congress, second session.
   Recommended modifications of project.-Under date of May 7,
1934, the Chief of Engineers recommended modification of the exist-
ing project so as to provide for a channel 9 feet deep and 100 feet
wide, at an estimated cost of $15,000, with annual maintenance of
$5,000, (Rivers and Harbors Committee Doc. No. 42, 73d Cong.,
2d sess.).
   Terminal facilities.-None, other than natural landings and about
10 small-boat landings used by fishing boats and trading launches.
These facilities appear to be adequate for present commerce.
   Operations and results during fiscal year.-There were no active
operations during the fiscal year. There were no costs. The total
expenditures were $1,618.76, applied to accounts payable for the
preceding fiscal year.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1912. On June 30, 1934, a channel 7.5 feet deep and 100
feet wide was available throughout this waterway. The costs were
$22,525.86 for new work and $56,851.91 for maintenance, a total of
$79,377.77. The expenditures amounted to $79,326.94.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $7,081.24, will be applied to maintenance dredging to
restore project dimensions, employing the U. S. pipe-line dredge
Blackwater, one-half month, during January 1935.
   1 Exclusive   of available funds.
546          REPORT             OF       CHIEF OF                ENGINEERS, U.         S. ARMY,         1934


  No funds can be profitably expended during the fiscal year 1936
because annual maintenance is not required.
                                              Cost and financial summnnary

Cost of new work to June 30, 1934-----------------------------                                                $22, 525. 86
Cost of maintenance to June 30, 1934-----------------------                                                    56, 851. 91
      Total cost of permanent work to June 30, 1934 -------------- 79, 377. 77
Value of plant, materials, etc., on hand June 30, 1934-------------  -50. 83
           Net total cost to June 30, 1934_______________--
                                                    -----------                                                   79, 326. 94

Net total expenditures--------------------------------------79,                                                       326. 94
Unexpended balance June 30, 1934--------------------                                                               7, 081. 24

           Total amount appropriated to June 30, 1934-----------------86, 408. 18

           Fiscal year ending June 30                             1930     1931         1932          1933             1934

Cost of new work     --------------------------------------------------             -                                    -
Cost of maintenance _____________-_________            _____ $1, 725. 85 $40, 021. 46- -
Total expended           ------------------------------------------                    1, 090. 89   38, 986. 83       $1, 618. 76
Allotted      --------------------------------------                     $3, 500. 00                42, 436. 63        2, 841. 09


Balance unexpended July 1, 1933__                                                                                 $5., 858. 91
Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934-----------------                                                                                    7, 000.00
     Amount to be accounted for_                                                                                      858. 91
                                                                                                                  1----------------------------
Deductions on account of revocation of allotment-___                                                               4, 158. 91

      Net amount to be accounted for--__                                                                           8, 700. 00
Gross amount expended-...........                                                              $1, 632. 16
Less reimbursements collected_    -                                                                 13. 40
                                                                                                                   1, 618. 76
           Balance unexpended June 30, 1934-______                                                                 7, 081. 24

                                        8. BLACKWATER RIVER, FLA.

   Location.-Rises in the south central part of the State of Alabama
and flows in a southwesterly direction for a distance of 75 miles
through the States of Alabama and Florida, emptying into Black-
water Bay. (See U. S. Coast and Geodetic Survey Chart No. 186.)
   Previous projects.-Adopted by the River and Harbor Act ap-
proved March 3, 1899. The total cost and expenditures under this
project were $5,000. Work under existing project was begun in 1906.
For further details see page 1834, Annual Report for 1915.
   Existing project.-This provides for a channel 9 feet deep at mean
low water and 100 feet wide from the mouth to Milton, a distance of
10 miles, to be secured by dredging at necessary points. The river
is tidal throughout the portion under improvement. The mean range
of tide is 2 feet, and the extreme range, except during storms, is 3
feet. The estimated cost of new work made in 1902, exclusive of
amount expended on previous project, was $15,000. The latest
 (1928) approved estimate of annual cost of maintenance is $5,000.
The existing project was authorized by the River and Harbor Act
of March 3, 1905 (H. Doc. No. 193, 58th Cong., 2d sess.). There is
                  RIVERS AND IIARBORS-                     MOBILE, ALA., DISTRICT                                                         547

no map of the Blackwater River published in any congressional
document or annual report.
   Terminal facilities.-There is a timber wharf at Milton and one at
Bagdad, both pile structures, extending to 16 feet of water. These
facilities appear to be adequate for present commerce.
   Operations and results durinq fiscal year.-There were no active
operations during the fiscal year. There were no costs. The total
expenditures were $375. 80, applied to accounts payable for the
preceding fiscal year.
   Condition at end of fiscal year.-The project was completed in
1916. On June 30, 1934, the controlling depth throughout the chan-
nel was 8.7 feet. The costs were $36,649.90 for new work and
$74,068.99 for maintenance, a total of $110,718.89.         The total
expenditures were $110,763.59.
   Proposed operations.-The unexpended balance at the end of the
fiscal year, $24.20, will be applied to maintenance contingencies.
   The sum of $15,000 can be profitably expended during the fiscal
year 1936, for restoration of project dimensions, employing the U. S.
pipe-line dredge Black~water 1 month.
                                          Cost and financial summary

Cost of new work to June 30, 1934                                           --                         -----                   $41, 649. 90
Cost of maintenance to June 30, 1934-----------------                                                                             74, 068. 99

        Total cost of permanent work to June 30, 1934---_____                                                                  115, 718. 89
Value of plant, materials, etc., on hand June 30, 1934 ---------------                                                                  44. 70

        Net total cost to June 30, 1934----------------------------                                                            115, 763. 59

Net total expenditures------------------------------------                                                                     115, 763. 59
Unexpended balance June 30, 1934 _                                          -----------                                                  24. 20

        Total amount appropriated to June 30, 1934----------------                                                             115, 787. 79

        Fiscal year ending June 30                  1930                    1931                   1932                 1933            1934


Cost of new work---------
Cost of maintenance    -      ---------          $12, 318. 45     -------                     ------               $12, 018. 53   --        ---

Total expended-    -   ----    --------           12, 318. 45                                                  -    11, 687. 43          $375. 80
Allotted_                                          6, 200. 00                -            I                ---      11, 397. 41         -289. 33


Balance unexpended July 1, 1933 ____-                                                                                                  $689. 33
Deductions on account of revocation of allotment                                                                                        289. 33

      Net amount to be accounted for___                                                                                                 400. 00
Gross amount expended_                      _
                      -----------------------                                                                                           375. 80
            Balance unexpended June 30, 1934___                                                                                          24. 20
Amount that can be profitably expended in fiscal year ending June
   30, 1936, for maintenance 1---                               -------                                            __             15, 000.00

              9. ESCAMBIA AND CONECUH RIVERS, FLA. AND ALA.

    Location.-One stream, rising in central Alabama below Union
Springs, flows southwesterly to Florida State line, thence southerly
   1Exclusive     of available funds.
548       REPORT OF CHIEF OF ENGINEERS,    U.   S. ARMY,   1934

through Florida to Escambia Bay, an arm of Pensacola Bay. In
Alabama approximately 168 miles long, and known as " Conecuh
River "; in Florida 651/2 miles long, and known as "Escambia
River." (See U. S. Coast and Geodetic Survey Chart No. 186.)
   Previous projects.-The sum of $5,000, appropriated in 1833, " for
the Escambia River only ", was expended. The River and Harbor
Act of August 2, 1882, adopted the original project modified by the
act of March 2, 1907. The total cost and expenditures prior to the
adoption of the present project were $71,175. Work under exist-
ing project was begun in 1881. For further details see page 1837,
Annual Report for 1915.
   Existing project.-This provides for a dredged channel 2,200 feet
long, 150 feet wide, and 51/2 feet deep at mean low water through
the bar at the mouth of the river, and a navigable channel from
the mouth to Patsaliga Creek, a distance of 147 miles. The channel
above the mouth of the river was to be obtained by the removal of
certain obstructions to navigation and by the construction of dikes,
wing dams, and shore protection to obtain 5 feet to the Florida
State line. A navigable channel in the Conecuh River was to be
obtained by the removal of snags, closing cut-offs, and constructing
wing dams. Dikes and wing dams are of the usual pile and brush
type. The mean range of the tide at the mouth of the river is 2
feet, and the extreme range, except during storms, is 3 feet. At the
Florida State line the ordinary seasonal fluctuation of stage does not
exceed 8 feet. The highest flood stage attained in the record flood
of 1929 was 31.3 feet above low water at the Florida State line and
50.6 feet at River Falls, Ala., 144 miles above the mouth. The
original estimates for new work, exclusive of the amount expended
on previous project, were $25,000 for the Escambia River. including
the bar at the mouth, made in 1879, and $31,000 for the Conecuh
River, made in 1905. The latest (1928) approved estimate of annual
cost of maintenance is $1,500. The existing project was authorized
by the following river and harbor acts: The act of June 14, 1880,
provided for the channel through the bar at the mouth of the river
and to the Florida State line (Annual Report for 1879, p. 852); the
act of March 2, 1907, provided for improvement of the Conecuh
River (H. Doc. No. 159, 59th Cong., 1st sess.). The only published
map of this river will be found in House Document No. 701, Sixty-
third Congress, second session.
  Recommended modifications of project.--The project has been
recommended for abandonment (H. Doc. No. 467, 69th Cong., 1st
sess.).
   Terminal facilities.-None are required other than the natural
landings now in use.
   Operations and results during fiseal year.-There were no active
operations during the fiscal year. There were no costs. The ex-
penditures were $155.81, for accounts payable June 30, 1933.
   Condition at end of fiscal year.-The existing project was com-
pleted about 1882 at a saving of $8,838 under the estimated cost.
Recent operations prior to present year have been confined to the
channel at mouth of river and to the bar immediately inside mouth.
On June 30, 1934, the controlling depths were: On bar at mouth of
river, 4.6 feet; first 10 miles above mouth, 7 feet; from this point
                  RIVERS AND HARBORS-MOBILE,                                          ALA., DISTRICT             549
to Murder Creek, depths vary from 3 to 5 feet. Conditions above
mouth of Murder Creek are not known, since no work has been done
higher upstream for many years. The costs were $47,161.26 for new
work and $104,575.24 for maintenance, a total of $151,736.50. The
total expenditures were $151,736.50.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $44.19, will be applied to maintenance contingencies.
   No funds can be profitably expended during the fiscal year 1936,
because annual maintenance is not required.
                                               Cost and financial summary

Cost of new work to June 30, 1934---------------------- $118,336.26
Cost of maintenance to June 30, 1934 ----------------------- 104, 575. 24

           Total cost of permanent work to June 30, 1934                                  ---------       222, 911. 50
Net total expenditures- ----------------------------------                                                222, 911. 50
Unexpended balance June 30, 1934---------------------------                                                     44. 19
           Total amount appropriated to June 30, 1934 -------------                                       222, 955. 69

           Fiscal year ending June 30                    1930             1931           1932     1933         1934


Cost of new work- ..-------
Cost of maintenance-----------------                   $6, 352.91 -----------------             $12,211.50
Total expended--        --------------------           6, 352. 91                               12, 055. 69     $155. 81

Allotted            -------------------------
                                           4, 800. 00-12,                                          348.74       -93. 05


Balance unexpended July 1, 1933------------------------------- $293.05
Deductions on account of revocation of allotment------------------ 93. 05

           Net amount to be accounted for----------------------------- 200. 00
Gross      amount expended---------------------------------------155. 81

           Balance unexpended June 30, 1934---------------------------44.                                             19

                                    10. PENSACOLA HARBOR, FLA.

   Location.-This harbor is a natural indentation of the coast line
of northwest Florida about 40 miles east of Mobile Bay. (See U. S.
Coast and Geodetic Survey Chart No. 186.)
   Previous projects.-Authorized by the River and Harbor Act ap-
proved June 18, 1878, amended and modified by acts of August 18,
1894, and March 3, 1899. Under this project and its modifications
the total cost and expenditures were $721,338.21, of which $594,688.55
was for new work and $126,649.66 for maintenance. Work under
existing project was begun in 1903. For further details see page
1835, Annual Report for 1915.
   Existing project.-This provides for securing a channel 30 feet
deep at mean low water and 500 feet wide from the Gulf of Mexico
to the dock line at the east end of the city of Pensacola, and also
provides that $150,000 may be used in constructing or purchasing a
seagoing suction dredge. Under this project channels to the depth
above indicated were required to be dredged for a distance of 10,000
feet through the outer bar and 1,200 feet through the inner bar.
550    REPORT OF   CHIEF OF ENGINEERS,     U.   S. ARMY,   1934

The mean range of tide throughout the harbor is approximately
1.4 feet near the entrance and about 2 feet at the head of the bay.
The extreme range, except during storms, is about 3 feet. No esti-
mate of the cost of new work is made. The latest (1928) approved
estimate of annual cost of maintenance is $30,000.
   The existing project was authorized by the River and Harbor Act
approved June 13, 1902. The latest published maps of the entire
harbor will be found in the Annual Report of the Chief of Engineers
for 1911, opposite page 1684, and in House Document No. 253, Sev-
enty-second Congress, first session. The Annual Report for 1891, at
page 1733, gives the latest detailed map of entrance, while the An-
nual Report for 1914, at page 2162, gives the detailed survey of the
outer bar.
   Supplementing the work authorized by Congress, the construction
of an entrance channel 32 feet deep and 500 feet wide from the Gulf
of Mexico to deep water in Pensacola Bay, and an inner harbor chan-
nel parallel to the pierhead line and not less than 50 feet therefrom,
500 feet wide and 30 feet deep, with approach channels 250 feet wide
and 30 feet deep at each end of the inner harbor channel and an
approach channel 250 feet wide and 30 feet deep to the pierhead
line south of the Muscogee Wharf, was included in the Public Works
program under the National Industrial Recovery Act.
   Recommended modifications of project.-Included in Public
Works program.
   Local cooperation.-The work included in the Public Works pro-
gram is subject to the condition that local interests shall furnish
free of cost to the United States suitable spoil disposal areas for
dredged material and provide, if deemed advisable, bulkheads to re-
tain the excavated material. These conditions are being complied
with.
    Terminal facilities.-Modern rail-connected terminal facilities
exist of adequate capacity for present commerce. (See Port Series
No. 3, pt. 2, revised 1929, Corps of Engineers.)
             OPERATIONS AND RESULTS DURING FISCAL YEAR

  Project adopted by Congress.-The U. S. hopper dredge Benyawrd,
operating in the entrance channel from September 16 to October 31,
1933, removed 691,816 cubic yards, all maintenance dredging. The
pipe-line dredge Moreland, under contract, removed 7,000 cubic
yards of material from the entrance to Bayou Chico between Janu-
ary 26 and January 29, 1934. The cost during the fiscal year, all
from maintenance and improvement funds, was $35,149.75, charged
to maintenance. The expenditures were $35,602.56.
   Project authorized by Federal Emergency Admninistration of Pub-
lic Works.-From the inner harbor channel the U. S. hopper dredge
Absecon, from November 9, 1933 to February 14, 1934, removed
785,420 cubic yards of material, and from March 1 to March 16,
1934, removed 175,260 cubic yards of material. The U. S. hopper
dredge Manhattan removed from the inner harbor channel 1,326,889
cubic yards of material, and from the entrance channel removed
584,460 cubic yards of material from January 23 to April 16, 1934.
The work accomplished was all new work. The inner harbor and
                     RIVERS AND HARBORS-                      1IOBILE,            ALA.?      DISTRICT                   551


entrance channels were completed May 31, 1934. The cost of the
work accomplished with Public Works funds was $119,626.67, all
charged to new work. The expenditures were $119,578.43.
   Condition at end of fiscal year.-The project adopted by Congress
was completed in 1915. On June 30, 1934, the controlling depth in
the entrance channel was 32 feet, and in the inner harbor channels,
30 feet. The total costs under the existing project were $1,075,026.03,
of which $352,249.74 was for new work and $722,776.29 for main-
tenance. The total expenditures were $1,074,669.47, all regular funds.
The cost of the work accomplished with Public Works funds was
$119,626.67, all charged to new work. The- expenditures were $119,-
578.43. Total cost of the improvement, all funds, was $1,194,652.70-
$471,876.41 for new work and $722,776.29 for maintenance. The
total expenditures were $1,194,247.90.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $24,244.73, will be applied to the operation of a U. S. sea-
going hopper dredge to restore project dimensions in the entrance
channel and inner harbor channel, approximately 1 month, during
November 1934.
   The additional sum of $45,000 can be profitably expended during
the fiscal year 1936, to be applied to the operation of a U. S. sea-
going hopper dredge for a period of 11/2 months, in the entrance and
inner harbor channels.
                                            Cost and financial summary
                                    MAINTENANCE      AND IMPROVEME;NT                FUNDS

Cost of new work to June 30, 1934 _____________                                           __                $946, 938. 29
Cost of maintenance to June 30, 1934______________-----------                                                849, 425. 95

      Total cost of permanent work to June 30, 1934___________ 1, 796, 364. 24
Minus accounts payable June 30, 1934__________________________         356. 56

Net total expenditures ______---- __-----1,                                                                  796, 007. 68
Unexpended balance June 300,1934____-----------__                                                             24, 244. 73

           Total amount appropriated to June 30, 1934______________ 1, 820, 252. 41

           Fiscal year ending June 30                  1930           1931            1932           1933             1934


Cost ofnew work-----
Cost of maintenance___                              $75, 530. 65   $26, 242. 71    $77, 035. 99   $34, 530. 94     $35, 149. 75
Total expended --                           _   _    50, 928. 49    42, 721. 23     45, 310. 01    61,128. 52        35, 602. 56
Allotted     ----------------------------
                  _                                  28, 000. 00    36, 000. 00     60, 000. 00    37, 901. 59       14, 775. 80


Balance unexpended July 1, 1933-            -__
                                     ________-______----          $45, 071.49
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934________________________ $16, 100. 00
Amount allotted from War Department Appropriation
  Act approved July 14, 1932 ___________- __-___---       928. 51
                                                                   17, 028. 51

Amount to be accounted for                                                                                           100. 00
                                                                                                                 6----------------------------
Deductions on account of revocation of allotment- ___--______                                                     2, 252. 71

           Net amount to be accounted for-_-------                                                               59, 847. 29
552           REPORT OF CHIEF OF ENGINEERS,                                      U. S. ARMY, 1934

Gross amount expended-------------------------$35,                                         775.64
Less reimbursements collected------------------------                                      173. 08
                                                                                                      $35, 602. 56

      Balance unexpended June 30, 1934     --------------------- 24, 244. 73
Outstanding liabilities June 30, 1934----------------------------    356. 56

           Balance available June 30, 1934------------------------23, 888. 17

Amount that can be profitably expended in fiscal year ending June
                             --- -- - -- -- - -- - -- - -- - -- - -- - -- -- - -
30, 1936, for maintenance 1                                                     45, 000. 00
                                                       PUBLIC    WORKS   FUNDS

Cost of new work to June 30, 1934---------------------------                                          119, 626. 67
Cost of maintenance to June 30, 1934-----------------------

      Total cost of permanent work to June 30, 1934-----------119, 626. 67
Minus accounts payable June 30, 1934---------------------------     48. 24

     Net total expenditures___------------------------------                                          119, 578. 43
Unexpended balance June 30, 1934-----------------------------                                              393. 12

           Total amount appropriated to June 30, 1934-------------                                    119, 971. 55

           Fiscal year ending June 30                           1930     1931       1932      1933          1934


Cost of new work...----------           -------------------------------------------- $119, 626. 67
Cost of maintenance .------------------              ----------------------------  ------------
                ---------------------
Total expended...._...                                                                                    119, 578. 43

Allotted    .------------------------------------------------                                             119, 971. 55


Amount allotted from National Industrial Recovery Act ap-
  proved June 16, 1933-_-----------------------------      --                                        $177, 000. 00
Deductions on account of revocation of allotment----------                                             57, 028. 45

      Net amount to be accounted for -----------------------                                          119, 971. 55
Gross amount expended __-----_---                         $135, 311. 01
Less reimbursements collected -----------------              15, 732. 58
                                                                                                      119, 578. 43

      Balance unexpended June 30, 1934 ----------------------                                              393. 12
Outstanding liabilities June 30, 1934--------------------------                                            295. 20

           Balance available June 30, 1934--                                                                  7. 92
                                                                                                             9----------------------

    CONSOLIDATED               COST AND FINANCIAL SUMMARY                   FOR PENSACOLA HARBOR, FLA.

Cost of new work to June 30, 1934  ------------------------ $1, 066, 564. 96
Cost of maintenance to June 30, 1934---------------- --------   849, 425. 95

     Total cost of permanent work to June 30, 1934---------- 1, 915, 990. 91
Minus accounts payable June 30, 1934------------------------         404. 80

     Net total expenditures----------------------------                                          1, 915, 586. 11
Unexpended balance June 30, 1934---------------------------                                           24,637. 85'

           Total amount appropriated to June 30, 1934-----------                                 1, 940, 223. 96
  1 Exclusive        of available funds.
                         RIVERS        AND HARBORS--MOBILE,                             ALA.,    DISTRICT                      553

            Fiscal year ending June 30                       1930           1931             1932          1933             1934


Cost of new work-----------------------                                                                                  $119, 626. 67
Cost of maintenance           ------------------          $75, 530. 65   $26, 242. 71    $77, 035. 99   $34, 530. 94       35, 149. 75
        Total cost- _---. ..------------------             75, 530. 65    26, 242. 71     77, 035. 99    34, 530. 94      154, 776. 42

Total expended_              ...-----------------------    50, 928. 49    42, 721. 23     45, 310. 01    61, 128. 52      155, 180. 99

Allotted...--------...     ---------...---------           28, 000.00     36,000. 00      60, 000. 00    37, 901. 59      134, 747. 35


Balance unexpended July 1, 1933------------------------------     $45, 071.49
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934____ ________________ $16, 100. 00
Amount allotted from War Department Appropriation
  Act approved July 14, 1932------------------            928. 51
Amount allotted from National Industrial Recovery Act
  approved June 16, 1933---------------------------- 177, 000. 00
                                                                  194, 028. 51
Amount to be accounted for________________________-------_                                                        239, 100.00
Deductions on account of revocation of allotment---------- ---                                                     59, 281. 16

      Net amount to be accounted for___________                                                                   179, 818. 84
Gross amount expended_______________________-__                                                 171, 086. 65
Less reimbursements collected _______----                                                        15, 905. 66
                                                                                                                  155, 180. 99

      Balance unexpended June 30, 1934-____--     __----------------                                                   24, 637. 85
Outstanding liabilities June 30, 1934___      __________     __                                                            651. 76

Balance available June 30, 1934_____________                                   ------------------- 23, 986. 09

Amount that can be profitably- - expended          in fiscal year ending June
                                   - -- - - - - - - - - - - - - - - - - - - - - - - -
30, 1936, for maintenance 1                                                                                       45, 000. 00

    11. INTRACOASTAL WATERWAY FROM PENSACOLA BAY, FLA., TO
                                                   MOBILE BAY, ALA.

   Location.-The waterway, 40.7 miles long, connects Pensacola Bay,
Fla., and Mobile Bay, Ala. The waterway follows Pensacola Bay,
Big Lagoon, Old River, Perdido Bay, Bay La Lanche, Wolf Bay,
Portage Creek, Oyster Bay, Bon Secours River and Bay, and Mobile
Bay. (See U. S. Coast and Geodetic Survey Charts Nos. 1265 and
1266.)
   Existing project.-This provides for a waterway 9 feet deep at
mean low water and 100 feet wide at the bottom from Pensacola Bay
to Mobile Bay through the natural waterways indicated above and
dredging the connecting links between these waterways. The mean
range of tide is about 1.2 feet, and the extreme range, except during
storm, 3 feet.
   The estimate of cost for new work, made in 1929 was $600,000, with
an annual maintenance cost of $29,000 for the first 3 years and
$10,000 thereafter.
   The existing project was authorized by the River and Harbor Act
of July 3, 1930 (H. Doec. No. 42, 71st Cong., 1st sess.). The latest
published maps of this waterway are United States Coast and
Geodetic Survey Charts Nos. 1265 and 1266.
  Local cooperation.-Fully complied with.
  Terminal facilities.-None, except those at Pensacola and Mobile.
     Exclusive of available funds.
554          REPORT OF CHIEF OF                       ENGINEERS,                U.    S. ARMY,          1934


   Operations and results during fiscal year.-The pipe-line dredge
Pontchartrain, under contract, removed a total of 1,243,502 cubic
yards of mud and sand, new work, over a distance of 13,633 feet, and
14,370 cubic yards of mud and sand, maintenance, over a distance of
850 feet, from July 1, 1933, to January 31, 1934. The pipe-line
dredge Tchefuneta, under contract, removed 2,168,996 cubic yards of
mud and sand, new work, over a distance of 52,000 feet, from July 1
to October 20, 1933. The pipe-line dredge Moreland removed 44,898
cubic yards of mud and sand, new work, over a distance of 3,350 feet,
from January 6 to January 22, 1934. The U. S. pipe-line dredge
Blacklater removed 216,913 cubic yards of mud and sand, all mainte-
nance, over a distance of 8,770 feet, from March 14 to April 10,
1934. The costs were $183,555.08, of which $163,757.55 was for new
work and $19,797.53 for maintenance. The expenditures were
$234,593.68.
   Condition at end of fisal year. The existing project was com-
pleted January 31, 1934, at a saving of $156,694 under the estimated
cost. The controlling depth, based on soundings taken April 10,
1934, is 9 feet. The total cost was $466,249.22, of which $443,306.03
was for new work and $22,943.19 for maintenance. The total ex-
penditures were $465,890.74.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $20,432.04, will be applied to the operation of one U. S.
sea-going hopper dredge 1 month, at such time as may be required
by the needs of navigation, in restoration of project dimensions in
Bon Secour Bay and other sections of the waterway.
   The additional sum of $30,000 can be profitably expended during
the fiscal year 1936, to be applied to the operation of one U. S. hy-
draulic pipe-line dredge, about 1/2 months, at such time as may be
required by the needs of navigation, in restoration of project dimen-
sions in the waterway.
                                         Cost and financial sumnmary

Cost of new work to June 30, 1934 1_______________                                                            $443, 306. 03
Cost of maintenance to June 30, 1934_     -     -- --------                                                     22, 943. 19

      Total cost of permanent work to June 30, 1934----                                                       466, 249. 22
Minus accounts payable June 30, 1934-       --       -                                                                358. 48

          Net total expenditures                  ----------------                      --                     465, 890. 74
Unexi pended balance June 30, 1934 _------------------                                                             20, 432. 04

           Total amount appropriated to June 30, 1934----------------                                         486, 322. 78

          Fiscal year ending June 30                       1930          1931           1932           1933            1934


C ost of new w ork ............-           --                    $63, 459. 59        $28, 288. 00 1$187,800.89      $163, 757. 55
Cost of maintenanc               --------------       ----------------------              494. 32   -_-_____          19, 797. 53

        Total cost --------------------------          -      -----    63, 459. 59    28, 782. 32   187, 800. 89     183, 555. 08

Total expended--------------             -                             21, 377. 97    82, 344. 57   127, 574. 52     234, 593. 68

Allotted_--------------------------                                   275, 000. 00 -62, 176. 00     233, 627. 48      39, 871. 30

    1   Increased $450, settlement claim W. Horace Williams Co.
               RIVERS AND HARBORS--MOBILE,                 ALA., DISTRICT                555
Balance unexpended July 1, 1933___________________________-----                  $215, 154.42
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934_________________-------               $18, 300. 00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933_________________-------------           22, 000. 00
                                                                                   40, 300. 00
                                                  _
       Amount to be accounted for ___________________-- _                         255, 454. 42
Deductions on account of impounded funds revoked__                                    428. 70

       Net amount to be accounted for__ _______________                           255, 025. 72
Gross amount expended _____________________________               238, 549. 58
Less reimbursements collected___________________                    3, 955. 90
                                                                                  234, 593. 68

    Balance unexpended June 30, 1934_______________________                        20, 432. 04
Amount covered by uncompleted contracts _________       ____                           358. 48
       Balance available June 30, 1934_________________________                    20, 073. 56

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1____________________________________                   30, 000. 00
     12. INTRACOASTAL WATERWAY, MOBILE BAY, ALA., TO NEW
                                      ORLEANS, LA

   Location.-This section of the intracoastal waterway, 119 miles in
length, extends from the 10-foot contour in Mobile Bay through Pass
Aux Herons into Mississippi Sound; thence through Mississippi
Sound passing north of Dauphin, Petit Boise, Ham, Ship and Cat
Islands; thence through Grand Island Pass, north of Grand Island,
into and through Lake Borgne and the Rigolets to Lake Pontchar-
train, thence through the improved channel through the middle
ground near the eastern end of Lake Pontchartrain and through the
lake to the State-owned Inner Harbor Navigation Canal at New Or-
leans. The Navigation Canal affords access to the Mississippi River
at the lower end of the city through a lock which is 75 feet wide,
640 feet long, with a minimum depth of 31.5 feet over the sills. (See
U. S. Coast and Geodetic Survey Charts Nos. 1266 to 1269.)
   Previous projects.-Lake Pontchartrain Channel adopted August
30, 1852, June 25, 1910, and August 8, 1917. The total costs under
these projects were $61,669.42, of which $56,372.22 was for new work
and $5,297.20 was for maintenance. The total expenditures were
$58,138.77.
   Mobile Bay-Mississippi Sound Channel adopted by the River and
Harbor Acts of May 23, 1828, and July 25, 1912. The total costs
were $172,411.42, of which $101,976.81 was for new work and $70,-
434.61 was for maintenance. The total expenditures were $168,831.30.
For further details see page 962 of the Annual Report for 193'0 and
page 838 of the Annual Report for 1929.
   Existing project.-This provides for a straight channel 300 feet
wide and 10 feet deep from the 10-foot contour in Mobile Bay to
the 10-foot contour in Mississippi Sound; and a channel 100 feet
wide and 9 feet deep from the 9-foot contour in Grand Island Pass
connecting Lake Borgne with Mississippi Sound, through the Rigo-
  'Exclusive   of available funds.
 556      REPORT OF CHIEF OF ENGINEERS,              U.   S.   ARMY,   1934


lets and Middle Ground Channel in Lake Pontchartrain to the 9-foot
contour in Lake Ponchartrain near the end of the Inner Harbor
Navigation Canal. Under ordinary conditions the mean tidal range
is about 134 feet and the extreme tidal range is about 3.4 feet.
    The estimate of cost for new work, revised in 1930, exclusive of
amounts expended on previous projects, was $75,000, of which $55,000
applies to the 10-foot channel and $20,000 to the 9-foot channel. The
latest (1929) approved estimate for annual cost of maintenance is
 $21,000, of which $7,000 applies to the 10-foot channel and $14,000
to the 9-foot channel.
    The project was adopted by the River and Harbor Act approved
July 3, 1930 (Rivers and Harbors Committee Doc. No. 4, 71st Cong.,
1st sess., 10-foot channel, and H. Doc. No. 341, 71st Cong., 2d sess.,
9-foot channel). The first-mentioned document contains the latest
published map of the 10-foot channel.
    Terminal facilities.-There is a wharf and landing at Mandeville.
The Industrial Canal and New Basin Canal, both controlled by the
State of Louisiana, are the terminals for most of the traffic on Lake
Pontchartrain. The existing terminal facilities are considered
adequ.ate.
    Operations and results during fiscal year.-None. The expendi-
tures were $46.57.
    Condition at end of fiscal year.-The project was completed in
1933. The controlling depths, ascertained June 1934, were as follows:
Mobile Bay to the 10-foot contour in Missississippi Sound section,
9 feet; mouth of Rigolets section, 9 feet; New Orleans, mouth of
Rigolets section, 9 feet. The total cost has been $100,952.20, of
which $77,907.70 was for new work, and $23,044.50 was for mainte-
nance. The total expenditures were $104,532.32.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $14,000, will be applied to the operation of one United
States hydraulic pipe-line dredge about three-fourths of a month, at
such time as may be required by the needs of navigation in the sec-
tion of this waterway between the mouth of Pearl River and the
Rigolets.
   The additional sum of $20,000 can be profitably expended during
the fiscal year 1936, to be applied to the operation of one United
States hydraulic pipe-line dredge about 1 month, at such time as
may be required by the needs of navigation, in the section of the
waterway connecting Mobile Bay and Mississippi Sound.
                           Cost and financial summary

Cost of new work to June 30, 1934_______     ____$179,                          884. 51
Cost of maintenance to June 30, 1934__----__________________-           2   93, 479. 11
       Total cost of permanent work to June 30, 1934____-----           273, 363. 62

                                  --
Net total expenditures_______ ______-______-                            273, 363. 62
Unexpended balance June 30, 1934___________________________              14, 000. 00
       Total amount appropriated to June 30, 1934                        287, 363. 62
  1 Increased $23.57 due to pro rata share of maintaining idle Government plant.
  2 Increased $23 due to pro rata share of maintaining idle Government plant.
                      RIVERS AND HARBORS-MOBILE,                             ALA., DISTRICT                            557

           Fiscal year ending June 30                 1930           1931          1932          1933                 1934


Cost of new work ___ ______ __-------__-------                    $58, 057. 23   $5, 345. 29   $6, 907. 87 _------ ---
Cost of maintenance--_-----------------             $3, 580. 12    10, 904. 51    4, 848. 52    7, 268. 47   __----__
        Total cost----------------------             3, 580. 12    68, 961. 74   10, 193. 81   14, 176. 34 -- ____------

Total expended            ....-------------------- ------------    56, 799. 28   30, 631. 19   17, 055. 28             $46. 57

Allotted-----------------------------                5, 000. 00    72, 986.82     2, 844. 02   43, 438. 45     -15,     845. 06


Balance unexpended July 1, 1933_____ ___---_----------                                                   $29, 891. 63
Amount allotted from War Department Appropriation Act ap-
proved Apr. 26, 1934------------------------------------                                                    14, 000. 00

     Amount to be accounted for___-- ----- _         ---------                                               43, 891. 63
Deductions on account of revocation of allotment______- ____--                                               29, 845. 06

      Net amount to be accounted for________________-------        14, 046. 57
Gross amount expended______---------------------------------------      46.57

            Balance unexpended June 30, 1934----------------------14, 000. 00

Amount that can be profitably expended in fiscal year ending June
   30, 1936, for maintenance 1--------------________                                                         20, 000. 00

                                        13. ALABAMA RIVER, ALA.

   Location.--This river is formed 18 miles above Montgomery, Ala.,
by the junction of the Coosa and Tallapoosa Rivers. From this
junction it flows in a southwesterly direction through the State of
Alabama for a distance of 320 miles, and unites about 44 miles north
of the city of Mobile, in the southwestern part of the State, with
the Tombigbee River to form the Mobile River. (See U. S. Geologi-
cal Survey charts for central and southwest Alabama.)
  Previous projects.-Adopted by acts of June 18, 1878, and July
13, 1892. The total cost and expenditures under this project were
$419,445.69, of which $400,420.57 was for new work and $19,025.12
for maintenance. Work under existing project was begun in 1905.
For further details see page 1837, Annual Report for 1915.
  Existing project.-This provides for securing a channel by open-
channel work not less than 4 feet deep at low water from the mouth
to Wetumpka, Ala., a distance of 331 miles. Under this project
dredging and construction works were required at various obstruct-
ing shoals, usually consisting of gravel bars distributed over the
entire length of the river. The variation between average high and
low water is 40.4 feet. The extreme variation is 58 feet at Mont-
gomery. The estimate of cost for new work, revised in 1928, is
$1,155,000, exclusive of amount expended on previous project. The
latest (1928) approved estimate of annual cost of maintenance is
$75000.
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1905, provided for the channel
from the mouth to Montgomery (H. Doc. No. 378, 59th Cong., 1st
sess.) ; the act of June 25, 1910, provided for the channel from Mont-
gomery to Wetumpka (H. Doc. No. 1089, 60th Cong., 2d sess.). The
latest published map of Alabama River will be found in the Annual
Report for 1913, page 2124.
    1Exclusive of available funds.
558     REPORT OF   CHIEF   OF ENGINEERS,   U. S.   ARMY,   1934


   Terminal facilities.-On the east bank at Montgomery, Ala., there
is a natural landing connecting with the city streets and with the
Louisville & Nashville Railroad. The facilities are considered ade-
quate for existing conditions. A wharf is needed at Selma, Ala.
   The various natural landings below Montgomery, except at Selma,
appear to serve present purposes.
            OPERATIONS   AND RESULTS   DURING   FISCAL YEAR

, Regular funds.-The U. S. snag boat Montgomery, working at
Gardner's Island and Catoma Bar, removed 6,753 cubic yards of
sand and gravel from the channel, and assisted in the construction
of 722 linear feet of rock-fill jetties at Gardner's Island. This work
was carried on from July 1 to September 30, 1933. The U. S. snag
boat McCalla, from April 23 to June 18, 1934, cut 154 overhanging
trees and removed 229 obstructions from the channel at various lo-
calities above Selma. All of the above work was maintenance. The
cost was $30,015.92, of which $949.59 was for new work, and $29,-
066.33 was for maintenance. The expenditures were minus
 $134,021.75.
    Public-works funds.-Supplementing the work authorized by
Congress, dredging and the construction of contraction works was
authorized by the Federal Emergency Administration of Public
Works. The U. S. pipe-line dredge Blackwater and attendant
plant removed 35,712 cubic yards of sand and gravel from channel
at Matthewson Bar; 36,011 cubic yards of sand and gravel from
channel at Potts Bar; 44,592 cubic yards of sand and gravel at
Shackleford's Bar; 98,553 cubic yards of dredging at Carter's Bar;
124,529 cubic yards of dredging at Aberdeen Wreck, and 65,802
cubic yards of sand and gravel of dredging at Earl's Bar, during
the period October 1, 193.3 to January 31, 1934. The U. S. snag
boat Montgomery removed 41 obstructions from channel at various
localities below Selma, and raised sunken barge No. 12, from No-
vember 1, 1933 to January 31, 1934. The U. S. pipe-line dredge
Blackowater, U. S. towboat Georgia, U. S. piledriver No. 1 and at-
tendant plant, built 800 linear feet of sand and gravel jetties capped
with rock using 1,235 tons of rock and 25,252 cubic yards of sand
and gravel at Potts Bar and Matthewson Bar, and 5,473 linear feet
of permeable pile dikes at Earl's Bar, Potts Bar, Stein's Island,
Haines Island, Matthewson Bar, Pigeon Creek Bar, Evans Upper
Bar, Evans Lower Bar, and Shackleford's Bar, using 2,700 tons
of rock and 2,684 piles during the period October 1, 1933, to Jan-
uary 31, 1934. The U. S. snag boat R. C. McCalla removed 32 ob-
structions at various localities between Selma and Montgomery,
from June 19 to 30, 1934. The U. S. piledriver No. 1 built 183
linear feet of permeable pile dike at Catoma Bar, from June 19
to 30, 1934. The cost was $125,000.87, all for new work, and the
expenditure was $116,510.82. The total costs for the year, all funds,
were $155,338.20 of which $125,950.46 was for new work and $29,-
066.33 was for maintenance. The total expenditures were minus
 $17,510.93.
    Condition at end of fscal year.-The channel depth has been im-
proved at the shallowest bars and shoals between the mouth of the
              RIVERS AND HARBORS-MOBILE,                   ALA.,   DISTRICT        559

river and Montgomery, Ala., by dredging and contraction works;
between Montgomery, Ala., and Wetumpka, Ala., the work has
consisted of removing snags. At the end of the fiscal year the exist-
ing project was 95 percent completed. The controlling depths at
the end of the fiscal year were as follows: Mouth to Selma, 4 feet;
Selma to Montgomery, 3.5 feet; Montgomery to Wetumpka, 3.0 feet.
Boats drawing 3.0 feet or less can usually operate throughout the
year. Gages are established at Montgomery, Selma, Coy, and Clai-
borne, the reading on the two first-named gages for extreme low
water being 3 feet. The work remaining to be done to complete
the project from Montgomery, Ala., to the mouth is the construction
of approximately 1,000 linear feet of spur dikes. The completion of
that portion of the project from Montgomery, Ala., to Wetumpka,
Ala., is not contemplated at the present time due to the absence
of all commerce on that section of the river. At the end of the fiscal
year the channel was in good condition. Some of the dikes were in
need of repair. The total cost was $2,300,461.10, of which $576,605.27
was for new work and $1,723,855.83 was for maintenance. The
total expenditures were $2,677,541.47.
   The cost of the work accomplished with Public Works funds was
 $125,000.87, all charged to new work. The expenditures were
$116,510.82.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $91,419.07, including accounts receivable, will be applied
as follows:
Accounts     payable__________________________________________$36,048.15
Maintenance:
    Repair and renewal of contraction works between mile 302
      and the mouth, employing the U. S. pipe-line dredge Black-
      water and attendant plant 21/3 months (Aug.-Oct. 1934) ___.             47, 370. 92
    Snagging operations from mile 302 to the mouth, employing
      the U. S. snagboat McCala 2 months (July-Aug. 1934)-____-                8, 000.00

                                                                              55, 370. 92
           Total________________            ___________                       91, 419. 07
               Total ~   -------------------------------               ___9        1.0
  The balance unexpended, including accounts receivable, at the end
of the fiscal year, $23,509.43, from an allotment from the National
Industrial Recovery Act of June 16, 1933, will be applied as follows:
Accounts payable June 30, 1934 ______________________________                 $8, 510. 30
New work: Construction of contraction works and dredging be-
  tween miles 281 and 285 above the mouth, employing the U. S.
  pipe-line dredge Blackwater and attendant plant, 1 month (July
  1964) ----------        -----------------------------------                 14, 9,99.
                                                                                      13
      Total        ---------------------------------------------              23, 509. 43
  The additional sum of $83,000 can be profitably expended during
the fiscal year 1936, as follows:
Maintenance:
   Repair and renewal of contraction works, and dredging between
      mile 302 and the mouth, employing the U. S. pipe-line dredge
      Blackwater and attendant plant for 5 month (July-Nov. 1935)- $75, 000
    Snagging operations from mile 302 to the mouth, employing the
      U. S. snagboat MoCalla 1 month, between July and December
      1935---_-----____---__---_---                        __                      8,000
           Total---------------__-____                                   _        83,000
      91536-ENa 1934-36
560            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                        1934

                                     Cost and financial summary

                             MAINTENANCE            AND IMPROVEMENT' FUNDS

Cost of new work to June 30, 1934 _____-______________-_    $977, 025. 84
Cost of maintenance to June 30, 1934__----     _________ 11, 742, 880. 95

      Total cost of permanent work to June 30, 1934__- __--                                     2, 719, 906. 79
Value of plant, materials, etc., on hand June 30, 1934 ____--.                                     388, 076. 09
      Net total cost to June 30, 1934_-______---__.......                                       2, 107,   982.
                                                                                                             88
Plus accounts receivable June 30, 1934__--   -- __________-                                 -       25, 052. 43

      Gross total costs to June 30, 19134-----_-----__ -- ---                                    2, 133, 035.31
Minus accounts payable June 30, 1934_-      __     _____      _____                                 36, 048. 15

     Net total expenditures_______-_                       -- ___-______ -           -          2, 096, 987. 16
Unexpended balance June 30, 1934                                               ______-_              6, 366. 64
                                                                                                    6_______-____

           Total amount appropriated to June 30, 1934_3..__4__                                  3, 1 13, 353. 80

   Fiscal year ending June 30            1930            1931           1932             1933             1934


Cost of new work__--------_            $50, 729. 07    $76, 546. 95   $14, 666. 46   $58, 823. 67           $949. 59
Cost of maintenance-............        18, 394. 31     70, 738. 86   156, 382. 94    54, 479. 56       1 29, 387. 74
      Total cost---------------         69, 123. 38    147, 285. 81   171, 049. 40   113, 303. 23        30, 337. 33
Total expended--------------           175, 258. 46    282, 817. 64    98, 543. 84   234, 380. 04     -134,   021. 75
Allotted     --------------------- 185, 000. 00        289, 152. 57     1, 257. 67   279, 731. 44     -150, 386. 66

  1Increased   $321.41, destruction barge No. 12.

Balance unexpended July 1, 1933___                                                                  $82, 731. 55
Amount allotted from War Department Appropriation Act
approved Apr. 26, 1934--------------------------------------                                         4, 000. 00

Amount to be accounted for-----------------------------------                                        86, 731. 55
Deductions on account of revocation of allotment---------------                                     154, 386. 66

      Net amount to be accounted for--------------------------67, 655. 11
Gross amount expended-------------------------     $211, 411. 97
Less:
    Reimbursements collected-------- $251, 270. 74
    Receipts from sales--------------  94, 162. 98
                                                    345, 433. 72
                                                                 -134, 021. 75

      Balance unexpended June 30, 1934--------------------                                           66,366. 64
Outstanding liabilities June 30, 1934--------------------------                                      46,848. 62

     Balance available June 30, 1934--                                                                9, 518. 02
                                                                                                     1-----------------------
Accounts receivable June 30, 1934-----------------------------                                       25, 052. 43

           Unobligated balance available June 30, 1934-------------                                 44, 570. 45

Amount that can be profitably expended in fiscal year ending
June 30, 1936, for maintenance ---------------------------                                          83, 000. 00
  1Increased $321.41, destruction barge No. 12.
  SExclusive of available funds.
                    RIVERS AND HARBORS--MOBILE,                                           ALA., DISTRICT                          561
                                                          PUBLIC WORKS, FUNDS

Cost of new work to June 30, 1934__ ____________---
                                         -__--                                                                      $125, 000. 87
Cost of maintenance to June 30, 1934_
          Total cost of permanent work to June 30, 1934_______-                                                         125, 000. 87
Plus accounts receivable June 30, 1934 _________20.                                                                                  25

      Gross total costs to June 30, 1934 ______________-- ____125,                                                           021. 12
Minus accounts payable June 30, 1934_________________-__----_                                                             8, 510. 30

     Net total expenditures_______-----___-__                                                                           116, 510. 82
Unexpended balance June 30, 1934______________-----------                                                                23, 489. 18

          Total amount appropriated to June 30, 1934_________-___                                                       140, 000. '00

          Fiscal year ending June 30                               1930           1931          1932         1933             1934


Cost of new work      ..----------                .----------------------------------------------- $120, 000. 87
Cost of maintenance--------                                       -   -------------     ------------
                                                                                              -      --------
Total expended ....          ._-    .        .    .           .......                    ..-                  --            116, 510. 82
A llotted ._ _.-.     ....      .       .   . .       .      . . .        ..---                                ------ 140, 000. 00
                                                                                                               _---


Amount allotted from National Industrial Recovery Act ap-
  proved June 16, 1933 ---------------------------                                                                  $140, 000. 00
Gross amount expended                              $______
                                  ________________ $122,  763. 52
Less reimbursements collected___________________       6, 252. 70
                                                                                                                        116, 510. 82

      Balance unexpended June 30, 1934 ________________--
                                                -         -23,                                                               489. 18
Outstanding liabilities June 30, 1934___     _____--------8,                                                                 510. 30
     Balance available June 30, 1934                   --                                       __--                    1_______
                                                                                                                        14, 978. 88
Accounts receivable June 30, 1934__.___________--__--_- -                                         -      -          -        20. 25
          Unobligated balance available June 30, 1934 ____                                         ___-- -     -14,         999. 13

        CONSOLIDATED COST AND FINANCIAL                                   SUMMARY        FOR ALABAMA         RIVER,        ALA.

Cost of new work to June 30, 1934_                                                                             $1, 102, 026. 71
Cost of maintenance to June 30, 1934 _______________-                                                          11, 742, 880. 95
      Total cost of permanent work to June 30, 1934_...      ___                                                2, 844, 907. 66
Value of plant, materials, etc., on hand June 30, 1934_ .___    __                                                 388, 076. 09
      Net total cost to June 30, 1934___ __ ___-     _______                                                    3, 232, 983. 75
Plus accounts receivable June 30, 1934_.__________________----                                                      25, 072. 68

       Gross total costs to June 30, 1934_ _________                                           -_____-          3, 258, 056. 43
1Minus accounts payable June 30, 1934-__-____                                                      -                44, 558. 45
                                                                                                             -____________
     Net total expenditures_______----------_________________                                                   3, 213, 497. 98
Unexpended balance June 30, 1934______________________ ___                                                          89, 855. 82

          Total amount appropriated to June 30, 1934 _..___....._                                               3, 303, 353. 80

   1   Increased $321.41, destruction barge No. 12.
562          REPORT OF                CHIEF OF ENGINEERS,                         U.    S.    ARMY,         1934


         Fiscal year ending June 30                        1930            1931           1932           1933                1934


Cost of new work- -----------------
                                 -------
                                     $50, 729. 07                      $76, 546. 95    $14, 666. 46   $58, 823. 67    $125, 950. 46
Cost of maintenance ......
                        ___.......... 18, 394. 31                       70, 738. 86    156, 382. 94    54, 479. 56     1 29, 387. 74
       Total cost   ---------    -     ---         -____ 69, 123. 38   147, 285. 81    171, 049. 40   113, 303. 23     155, 338. 20
Total expended_ _-              _-           --         175, 258. 46   282, 817. 64     98, 543. 84   234, 380. 04    -17, 510. 93
Allotted__..__-------...___________           ....
                                             _______    185, 000. 00   289, 152. 57      1, 257. 67   279, 731. 44    -10,     386. 66

  1 Increased $321.41, destruction barge No. 12.

Balance unexpended July 1, 1933_ __________-__   ___________                                                     $82, 731. 55
Amount allotted from War Department Appropria-
tion Act approved Apr. 26, 1934_ _____________     $4, 000. 00
Amount allotted from National Industrial Recovery
  Act approved June 16, 1933-------  ____________ 140, 000. 00
                                                                                                                 144, 000. 00

Amount to be accounted for_--------------------------------                                                      226, 731. 55
Deductions on account of revocation of allotment-_____-_---                                                      154, 386. 66

Net amount to be accounted for          ___                                                                           2, 344. 89
                                                                                                                     7__________________
Gross amount expended ________________________ 334, 175. 49
Less:
    Reimbursements collected---------$257, 523.44
    Receipts from sales --- ______-----     94, 162. 98
                                                        351, 686. 42
                                                                                                                --17, 510. 93
      Balance unexpended June 30, 1934____________________                                                           89, 855. 82
Outstanding liabilities June 30, 1934____ ___________________-                                                       55, 358. 92

Balance available June 30, 1934_______________________________-                                                      34, 496. 90
Accounts receivable June 30, 1934      ________25,                                                                       072. 68

          Unobligated balance available June 30, 1934____________                                                    59, 569. 58

Amount that can be profitably expended in fiscal year ending
June 30, 1936, for maintenance ______________________                                                               83, 000. 00

14. OPERATING AND CARE OF LOCKS AND DAMS ON COOSA RIVER,
                       GA. AND ALA.

  The improvement for which report is made under this caption
forms part of the project for Coosa River, Ga. and Ala. See
Annual Report for 1931, page 892, where general information can
be found. The completed locks and dams have been operated and
maintained under the permanent indefinite appropriation since June
30, 1890, for Locks and Dams Nos. 1, 2, and 3; since September 22,
1913, for lock and dam at Mayos Bar; since May 19, 1914, for Lock
and Dam No. 4.
  Operations and results during fiscal year.--Repairs to break in
dam at Mayos Bar were completed. The work consisted of quarry-
ing and placing 21,975.4 tons of rock, employing the U. S. towboat
Leota and barges No. 14 and No. 20. The total cost was $9,881.10.
The total expenditures were $9,986.38.
   Condition.at end of fiscal year.-Locks and Dams Nos. 1, 2, and 3,
and lock and dam at Mayos Bar had been completed. Lock and
Dam No. 4 had been completed, except about 1 percent of work
   1 Exclusive of available funds.
                    RIVERS AND HARBORS                M1VIOBILE,             ALA.,        DISTRICT                          563
required on the lock, which consists in the completion of the back
fill and completion of upper guard wall. The result of the work was
to provide 4-foot navigation from Mayos Bar to Rome, Ga., and 31/4
miles from Lock No. 4 to Gadsden, this depth being controlled by
the sills at Lock No. 1. All locks and dams are in good condition
so far as completed, except Lock No. 1 and Dam No. 5. At Lock
No. 1 the miter sills are badly worn and are in need of replacement
to permit successful operation of the lock. At Dam No. 5 there are
two breaks aggregating a total length of approximately 225 feet.
Repairs are not contemplated at either of these. The total cost for
the operating and care of the 5 locks and 6 dams to the end of the
fiscal year was $549,314.42. The total expenditures were $552,295.49.
    Proposed operations.-The locks and dams will be operated and
maintained under allotments from appropriations made available
for such purposes.
                                    Cost and financial suwnmtary
Cost of maintenance to June 30, 1934---------------------------$549, 314. 42
Value of plant, materials, etc., on hand June 30, 1934------------ 3, 213. 86

           Net total cost to June 30, 1934----------                                                           552, 528. 28
Minus accounts payable June 30, 1934---------------------------                                                          232. 79

      Net total expenditures                                                                                   552, 295. 49
Unexpended balance June 30, 1934_                                                                                3, 348. 29
           Total amount appropriated to June 30, 1934---------------555,                                                 643. 78

           Fiscal year ending June 30          1930              1931                1932              1933               1934


Cost of new work----------_-.-.-                                                              -- -                 .
Cost of maintenance                        $12; 221. 80   $17, 844. 70        $24, 546. 12           $9, 922.06          $9, 881.10
Total expended_         __                  17, 488. 47        15, 621. 67      28, 602. 16          10, 730. 21          9, 986. 38
Allotted       --   -                       16, 000. 00        28, 000. 00      18, 000. 00          10, 728. 66         10, 925. 71



Balance unexpended July 1, 1933_                -------                                                            $2, 408. 96
Amount allotted from permanent indefinite appropriation, section
   6, River and Harbor Act, March 3, 1909 --                                    -------                            14, 000. 00

           Amount to be accounted for _                   --            -----                             _        16, 408. 96
Deductions on account of impounded funds revoked                                -_                                     3, 074. 29

      Net amount to be accounted for__                                                                             13, 334. 67
Gross amount expended_               --                                               $10, 158. 25
Less reimbursements collected                                                              171. 87
                                                                                                                       9, 986. 38

      Balance unexpended June 30, 1934------------------------                                                         3, 348. 29
Outstanding liabilities June 30, 1934_                                                                                    232. 79

     Balance available June 30, 1934                                                                                   3, 115. 50
Amount alloted for fiscal year 1935--                                                                                  6, 000. 00

           Balance available for fiscal year 1935-----------------                                                     9, 115. 50
                                   15. MOBILE HARBOR, ALA.

  Location.-This harbor, located along the lower 5 miles of Mobile
River, is in the southwestern part of the State of Alabama, 91 miles
564     REPORT OF CHIEF OF ENGINEERS, UTJ.S. ARMY,        1934

by water from Pensacola Harbor, Fla., on the east and 90 miles from
Gulfport Harbor, Miss., and 144 miles from the mouth of the Missis-
sippi River on the west. (See U. S. Coast and Geodetic Survey
Chart Nos. 1266 and 1267.)
   Previous projects.-The original project for the bar channel was
adopted June 13, 1902. The original project for the bay and river
channels was adopted May 20, 1826, and subsequent projects
adopted July 11, 1870, March 3, 1879, August 11, 1888, March 3, 1899,.
June 25, 1910, and August 8, 1917. The cost was $10,779,785.79, of
which $6,683,104.68 was for new work and $4,096,681.11 was for
maintenance. The total expenditures were $11,739,246.59.          For
further details see page 1840 of Annual Report for 1915; pages 802
and 807 of Annual Report for 1916; and page 833, Annual Report,
for 1929.
   Existing project.-This provides for a channel across Mobile Bar
36 feet deep at mean low water and 450 feet wide, and about 1.5 miles
long, connecting the 36-foot contours south and north of the bar;
for a channel 32 feet deep at mean low water and 300 feet wide from
deep water in Mobile Bay to a point at the north edge of the pro-
posed quarantine anchorage basin; for a channel 32 feet deep at
mean low water and 350 feet wide from the north edge of the quar-
antine anchorage basin to the mouth of Mobile River; for an anchor-
age basin 32 feet deep at mean low water extending 1,000 feet south
from the north edge of the present pier of the Mobile quarantine
station and 200 feet west of the west edge of the dredged channel in
Mobile Bay; and for a channel 32 feet deep at mean low water, with
a width of 500 feet, from the mouth of Mobile River to a point ap-
proximately 5,000 feet below the mouth of Three Mile Creek, and
a width of 300 feet from that point to the highway bridge across
Mobile River about 1,000 feet below the mouth of Chickasaw Creek,
for easing the bends at the mouth and about 3,000 feet abbve the
mouth, and for the removal of sunken obstructions. Under ordinary
conditions the mean tidal range at the lower end of the improve-
ment is 1.1 feet and at the upper end 1.4 feet, and the extreme tidal
range is 3.4 feet at the lower end and 3.6 feet at the upper end.
   The estimate of cost for new work made in 1930 is $478,000, ex-
clusive of amounts expended on previous projects. The latest (1930)
approved estimate for annual cost of maintenance is $360,000.
   This project was adopted by the River and Harbor Act approved
July 3, 1930 (Rivers and Harbors Committee Doc. No. 26, 71st Cong.,
2d sess.). The latest published map of the locality is in the project
document.
   Local cooperation.-Compliedwith.
   Terminal facilities.-The facilities of this port are considered
adequate for the existing commerce and will suffice for a considerable
increase thereof. (See Port Series No. 3, pt. 1, revised 1929, Corps
of Engineers.)
   Operations and results during fiscal year.-Work, consisting of
dredging and the removal of sunken obstructions, was carried on
with United States plant and hired labor and by contract. The
dredge San Diego, from July 1 to 19, 1933, working in the Mobile Bay
Channel under contract, removed 475,633 cubic yards of mud and
             RIVERS AND HARBORS-MOBILE,                          ALA.,   DISTRICT          565
sand, all new work, over a distance of 9,960 feet.      The U. S. pipe-
line dredge Pascagoula, working in the Mobile Bay Channel, from
January 10 to June 30, 1934, removed 3,329,825 cubic yards of mud
and sand over a distance of 60,233 feet. The U. S. hopper dredge
Benyaurd, working in the Outer Bar Channel, from May 7 to June
30, 1934, removed 816,571 cubic yards of material; the U. S. derrick
boat J. M. Pratt,from July 1, 1933, to June 30, 1934, working in the
Mobile River Channel removed 3,165 obstructions over a distance of
28,300 feet. All the above work was maintenance. The total cost
was $197,719.44, of which $35,817.94 was for new work and $161,-
901.50 for maintenance. The total expenditures were $158,919.08.
No work was done on the Outer Bar Channel with funds provided
by the Public Works Administration.
   Condition at end of fiscal year.-The existing project was 98 per-
cent completed at the end of the fiscal year. The work remaining to
be done to complete the project consists of dredging the Outer Bar
Channel to a width of 450 feet and depth of 36 feet. The controlling
depths at mean low water ascertained during June 1934 were as fol-
lows: Outer Bar Channel, 34 feet; Mobile Bay Channel, 32 feet;
Mobile River Channel, 32 feet. The total cost was $1,439,252.60, of
which $501,339.01 was for new work and $937,913.59 for maintenance.
The total expenditures were $1,219,052.88.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $362,519.79, including accounts receivable, will be applied
as follows:
Accounts payable June 30, 1934 ---------              ------------------ $32, 227. 30
Maintenance :
    Dredging advertised under specifications dated Dec.
      19, 1933, and commenced Jan. 10, 1934, from
      about 3,200 feet south of beacon 4 to deep water
      in the lower end of the bay, %3/month (July 1-21,
                          ---------------------------
       1934)_ _ __________----                                 $20, 000. 00
    Dredging by contract over west 220 feet of the Mo-
      bile Bay Channel, between beacons 38 and 32, to
      be completed about Dec. 31, 1934__-----------_ 139,500.00
    Dredging to be advertised about Nov. 15, 1934, and
      completed about Mar. 31, 1935, on the east 220
      feet of the Mobile Bay Channel, between beacon
      16 and buoy 16----------------------------                70, 000.00
    Dredging to be advertised about Feb. 15, 1935, and
      completed about June 30, 1935, on the east 250
      feet of the Mobile River Channel from the north
      end of Tangent 3, approximately 1,300 feet south
      of the north end of Tangent 4----------------             58, 792. 49
    Snagging in Mobile River with U. S. derrick boat
      J. M. Pratt, about 12 months, (July 1934 to June
      1935)    ------------------------------------             42, 000. 00
                                                                            330, 292. 49
         Total      ------------------------------------------                      362, 519. 79
   The unexpended balance at the end of the fiscal year, $14,000,
allotted from funds made available by the National Industrial Recov-
ery Act of June 16, 1933, will be applied to new work, dredging in the
Mobile Outer Bar Channel by the operation of one sea-going hopper
dredge, one-half month at $25,000 a month, during July 1934.
566          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                             1934

  The additional sum of $270,000 can be profitably expended during
the fiscal year 1936, as follows:
Maintenance:
   Dredging in the Mobile Bay Channel                              (July 1935 to June 30,
            1936) 12 months-                  __-___-________________                       __.___$225, 000
      Operation of U. S. derrick boat J. M. Pratt on snagging work in
        Mobile River, about 12 months (July 1935 to June 1936) ----__                                        45, 000
         Total        -----------------------------------------------                                      270, 000
                                       Cost and financial summary
                              MAINTENANCE AND IMPROVEMENT FUNDS


Cost of new work to June 30, 1934---------------------------_                                      $7, 184, 443. 69
Cost of maintenance to June 30, 1934-------------------------                                      2 5,034, 594. 70
      Total cost of permanent work to June 30, 1934----------                                       2, 219, 038. 39
Value of plant, materials, etc., on hand June 30, 1934                        -----------              711, 172. 41
      Net total cost to June 30, 1934-------------------                                           12,930, 2:10.80,
Plus accounts receivable June 30, 1934-----------------------                                          60, 315. 97
      Gross total costs to June 30, 1934 ._....                                                    12,990, 526. 77
Minus accounts payable June 30, 1934------------------------                                           32, 227. 30
         Net total expenditures_______________________                                  _          12, 958, 299. 47
Unexpended balance June 30, 1934-...............                                                        302, 203. 82
         Total amount appropriated to June 30, 1934------------                                    13, 260, 503. 29

   Fiscal year ending June 30             1930            1931             1932             1933            1934


Cost of new work .--------------                       $132,800.00       $97, 519. 28   $234, 947.22      1 $36, 072. 51
Cost of maintenance                    $236, 260. 85    376, 806. 97     148, 359. 68    157, 689. 80     2 223, 473. 96
      Total cost-----------        -    236, 260. 85    509, 606. 97     245, 878. 96    392, 637. 02      259, 546. 47
Total expended_                          34, 404. 08    469, 781. 55     232, 610. 11    357, 742. 14      158, 919. 08

Allotted_                              -17, 815. 97     612, 800. 00   -126, 381. 59     516, 007. 08      184, 036. 82

  1 Increased by $254.57 due to pro rata share of cost of maintaining idle Government plant.
  2 Increased by $61,097.83 due to decrease in valuation of Pascagoula boat yard July 1, 1933, and by $474.63
due to pro rata share of cost of maintaining idle Government plant.

Balance unexpended July 1, 1933_ _____ _-___---           $277, 086. 08
Amount allotted from War Department Appropriation Act ap-
proved Apr. 26, 1934     ----       --------------------  254, 000. 00

     Amount to be accounted for----------------------                                       _           531, 086. 08
Deductions on account of revocation of allotment_-_                                                      69, 963. 18

      Net amount to be accounted for--------------------------                                          461, 122. 90
Gross amount expended---------------------------$490, 315. 59

   xIncreased by $254.57 due to pro rata share of cost of maintaining idle Government
plant.
  2 Increased by $61,097.83 due to decrease in valuation of Pascagoula boat yard July
1, 1933, and by $474.63 due to pro rata share of cost of maintaining idle Government
plant.
                  RIVERS AND HARBORS-MOBILE, ALA., DISTRICT                                                       567
Less:
    Reimbursements collected---------- $331, 348. 91
    Receipts from sales ____________          47. 60
                                                                         $331, 396. 51
                                                                                                     $158, 919. 08
      Balance unexpended June 30, 1934_____________________--                                         302, 203. 82
Outstanding liabilities June 30, 1934___________________----__                                         57, 194. 70

      Balance available June 30, 1934 ______.._________-                                __-           245, 009. 12
Accounts receivable June 30, 1934______   __       __________                                          60, 315. 97

         Unobligated balance available June 30, 1934______________                                    305, 325. 09

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1--------------                                                            270, 000. 00
                                        PUBLIC WORKS FUNDS

Cost of new work to June 30, 1934
Cost of maintenance to June 30, 1934____________________________                                  --------
      Net total expenditures

Unexpended balance June 30, 1934 ______   _______-       -_______$14, 000. 00
Total amount appropriated to June 30, 1934____________________    14, 000. 00

         Fiscal year ending June 30             1930          1931       1932                 1933          1934


Cost of new work---.---------         ---------------------                     -       ---......
                                                                                             -    --..........
Cost of maintenance----
Total expended          -------------------        --                                       - -
Allotted ..----------    -------------   -----------------------                                                 $14, 000

Amount allotted from National Industrial Recovery Act ap-
proved June 16, 1933_--- ---------- _        ____                                                    $50, 000. 00
Deductions on account of revocation of allotment --------------                                        36, 000. 00

      Net amount to be accounted for ______________________                                            14, 000. 00
Gross amount expended______ _______________      $23, 857. 21
Less reimbursements collected _________________    23, 857. 21

         Balance unexpended June 30, 1934_____________________                                         14, 000. 00
      CONSOLIDATED         COST AND FINAN'CIAL SUMMARY               FOR MOBILE         HARBOR,         ALA.

Cost of new work to June 30, 1934------------------------                                     2 $7, 184, 443. 69
Cost of maintenance to June 30, 1934 __________________--- _                            _          5, 034, 594. 70
      Total cost of permanent work to June 30, 1934----------                                     12, 219, 038. 39
Value of plant, materials, etc., on hand June 30, 1934                 ----------                     711, 172. 41
      Net total cost to June 30, 1934_________________________                                    12, 930, 210. 80
Plus accounts receivable June 30, 1934 ......-                                                         60, 315. 97
      Gross total costs to June 30, 1934_                                                         12, 990, 526. 77
Minus accounts payable June 30, 1934_______________________                                            32, 227. 30
     Net total expenditures       ____________________                                            12, 958, 299. 47
Unexpended balance June 30, 1934___________________________                                           316, 203. 82
         Total amount appropriated to June 30, 1934 .-.....--                       _             13, 274, 503. 29
   1Exclusive of available funds.
  2Increased by $254.57 due to pro rata share of cost of maintaining idle Government
plant.
   SIncreased by $61,097.83 due to decrease in valuation of Pascagoula boat yard July 1,
1933, and by $474.63 due to pro rata share of cost of maintaining idle Government plant.
H:68           REPORT OF CHIEF OF ENGINEERS,                                  U. S. ARMY,             1934


    Fiscal year ending June 30                 1930            1931             1932           1933                 1934


Cost of new work__                                          $132, 800. 00    $97, 519. 28   $234, 947. 22        1 $36, 072. 51
Cost of maintenance_............         $236, 260. 85       376, 806. 97    148, 359. 68    157, 689. 80        2 223, 473. 96
        Total cost---------------236, 260. 85                509, 606. 97    245, 878. 96    392, 637. 02          259, 546. 47
'Total expended----------------               34, 404. 08    469, 781. 55    232, 610. 11    357, 742. 14          158, 919. 08

Allotted__.....____..      ________.._    -17, 815. 97       612, 800. 00   -126, 381. 59    516, 007. 08          198, 036. 82

   1 Increased by $254.57 due to pro rata share of cost of maintaining idle Government plant.
   2 Increased by $61,097.83 due to decrease in valuation of Pascagoula boat yard July 1, 1933, and by $474.63
ilue to pro rata share of cost of maintaining idle Government plant.

;Balance unexpended July 1, 1933_________________________-__                                                $277, 086. 08
Amount allotted from War Department Appropria-
  tion Act approved Apr. 26, 1934_______________ $254, 000. 00
Amount allotted from National Industrial Re-
  covery Act approved June 16, 1933_111111         50, 000. 00
                                                                                                            ew
                                                                                                                 43f 000 c
                                                                                                                  m, vvv. vv




      Amount to be accounted for___        _________----                                                     581, 086.08
Deductions on account of revocation of allotment_______                                                      105, 963. 18

        Net amount to be accounted for __       ______________                                               475, 122. 90
,Gross amount expended____________--
                                   --------           514, 172. 80
Less :
     Reimbursements collected---- ---   $355, 206. 12
     Receipts from sales--------- __-          47. 60
                                                      355, 253. 72
                                                                                                             158, 919. 08

       Balance unexpended June 30, 1934______________                                                       316, 203. 82
,Outstanding liabilities June 30, 1934___                                                                     57, 194. 70

      Balance available June 30, 1934_                                                                      259, 009. 12
Accounts receivable June 30, 1934_______________________                                                      60, 315. 97

           Unobligated balance available June 30, 1934_                                                      319. 325. 09

Amount that can be profitably expended in fiscal year ending
June 30, 1936, for maintenance 1_____________        ___                                                   270, 000.00

   16. BLACK WARRIOR, WARRIOR, AND TOMBIGBEE RIVERS, ALA.

   Location.-The above names apply to what is virtually a single
stream having its source in northern Alabama, flowing in a gen-
-eral southwesterly direction, and uniting with the Alabama River
to form the Mobile River, 45 miles above Mobile Bay. (See U. S.
Geological Survey map of Alabama.)
   Previous projects.-The original project for the improvement of
Warrior River now combined with the Black Warrior and Tom-
bigbee Rivers was adopted by act of March 3, 1875. The total cost
and expenditure of previous projects prior to adoption in 1884 of
the existing project was $656,930.78, of which $606,930.78 was for new
work and $50,000 for maintenance. For further details see page
1841 of Annual Report for 1915.
   Existing project.-This provides for the construction of 17 dams
and 18 locks, the extra lock being at Dam No. 17, where the lift of
61 feet is equally divided between two locks in tandem, and for such
dredging and clearing of channels by snagging as might be neces-
   1Exclusive           of available funds.
                           RIVERS AND HARBORS-MOBILE,                                                          ALA.                DISTRICT                             569

sary to secure an all-year channel of 8 feet depth at low water from
the mouth of the Tombigbee River to the junction of the Mulberry
and Locust Forks of the Black Warrior River, a distance of 3621/
miles, and thence for a distance of 36 miles on the Mulberry Fork
to Sanders Ferry, and 16 miles on the Locust Fork to Nichols Shoals,
making a total distance of 4141/2 miles.
    The maintenance of the section of the Tombigbee River below
Lock No. 1 to its mouth, a distance of 66 miles, formerly reported
under the title "Tombigbee River, Ala., from mouth to Demopolis
  (maintenance of channel) " authorized by the River and Harbor Acts
approved September 19, 1890, and June 13, 1902, is included in this
project. The last separate report under the above-quoted title is
shown on page 781, Annual Report for 1926.
    The following statement shows conditions of locks and dams, all
of which have been open for through traffic since May 1915:
                                 Location and other data for locks in this system

                                                                                                                                                                      Depth
                            Dis-                                                                      Width of chamber and                                             over
       Lock No.            above                Nearest town                             tance         greatest length available                           Lift       sills at
                           mouth                                                                       for the full width (feet)                                        low
                                                                                                                                                                      water


                               Miles                                                     Miles                                                             Feet         Feet
  1------------                 66       St. Stephens, Ala---------                          3        281.9 by 52                        ---                9. 00        18. 0
  2---                         137       Pennington, Ala .........                           6        286 by 52               ------                       12. 00         8. 5
  3                            159        O kchia, Ala __.--. .                 .               5 .        .do _ ....                        ....          10. 00            8. 5
  4--                          186       Demopolis, Ala ------           _                      1     285.6 by 52                                          10. 00            8. 5
  5                            201       Cedarville, Ala----                                    5          do                                              10. 00            8. 5
  6-----------                 221. 5    Sawyerville, Ala-                                      5          do                                              10. 00            8. 5
  7-----------                 237       W edgeworth, Ala ........                              5     284.7 by 52                                          10. 00            8. 5
  8-----------_                253       Akron, Ala            __                               3     284.7 by 51.65           ------------                10. 00            8. 5
  9-----------                 270       Powers, Ala ......      .......                        4     284.7 by 52 ...............                          10. 00            8. 5
10_                            317       Tuscaloosa, Ala-----------                                   286.6 by 52      ----                                 9. 86            8. 5
11_                            317.5         do---------------                                        286 by 52----------------                             8.50             8.5
12..      ..        ..         318    . .do . .....-.                               .           1 286.2 by 52                                             10. 50             8.5
13      -.....                 325     Tidewater, Ala_--                                          285.5 by 52 .---------                                - 12. 14             8. 5
14                             328. 5 Searles, Ala       __                                     8 282.1 by 52_                                            14. 00             8. 5
15_.                           335       Kellerman, Ala .-.                    .                6 .        .do _       ....               ....             14. 00            8. 5
16.. ..             ..         341.5 .      .do -                                             14      285.5 by 52.             .......                     21.00             8. 5
17 2    --------.              343      -..  do-----------------                              14            do     _          --       - -          -      61.00             8.5

                                                                                                               Total lift -------                       242. 00


                                                                                        Type of construction                                      Date       Actual cost
   Lock No.                    haracter of            Kind of                                                                                    of com-     of lock and
                                                                           Lfoundationock                    Dam                                 pletion         dam


   L-----------          Soft rock .----- Fixed_ Concrete__ Concrete ------- ---------                                                        1909              $560, 290. 02
   2...........          Hard clay --------- do ----- do ......                                  Timber crib, stone filled --                 1915                560, 114. 09
 :3                     ----.   do  ....-   ..           .do      .         .do   .     .      --    .do   .      .        -                  1915                609,622. 80
 -4-----------                  do ..........
                                          -                 . do .... - do                  ...---- do -                -----------           1908                479, 000. 00
  5 ...............             do ---                        do -            do -                    do     .      .-                        1908                501,000. 00
6-----------             Piles---------------               do.-----do -----....                     do ----                   .------------ 1908                443, 000.00
  '7 ..---------------do----------                            do .            do                      do-----------------                     1903                225, 600.00
  8-----------_             __do ------- -              -- do              C---..do
                                                                                 cret          ondo             .----
                                                                                                                    ------------              1903                212, 400.00
  9- - - --._. - -----
10 River-is-t Hard sandstone .
                              - d o ...     .      .   do     ---
                                                             --               d
                                                                             _d
                                                              do ay Stonereadis
                                                                               o    .. ....
                                                                                             --
                                                                                                   .---
                                                                                                      d o
                                                                                                       -----         ---
                                                                                                      do t-----------------
                                                                                                                             ---------        1902
                                                                                                                                              1895
                                                                                                                                                                  202, 440. 00
                                                                                                                                                                  244, 500. 00
11 h                            doe si1esadon
                       __ or thdoe  .dph         ---                          m           -- -m           .--
                                                                                                 ido---------------                          1895                 170, 000. 00
12.-        - - - -_ __do- -.. . . .. . do- ...... do . ---- . .. do-..-------------                           - -                            1895                160, 500.00
13------------------------do-                                     ...... do---                   Stone-------------------- 1905                                   203, 700.00
14.-----------                  do .- .....                   do...- Concrete_ Concrete -----------------                                     1910                414, 714.89
15---------------do.----------do ---                                      -- do -----           --. do----                                    1910                430, 233.87
1 6.-- - - - - - - - - - doo                . . . . . . -_do
                                                          .         --.. - - do - - - -. . . . .d o . - .- -. - ..--   - - - - - - - - --- 1 9 1 5                5 2 0 , 85 3 .68
17 - - - - - - - -       ---    do                 - d o -- - - . do - - - - -- - .d o -. - . . . . . . . . . . . . .                      3 1 91 5         4 3 , 1 74, 070 .0 0

   I River is tidal below this lock and daily gage readings show that on an average of only 2 days per year
is the depth over the sill less than 8 feet, the minimum being 6.9 feet.
   2 Double lock.
   3 Opened to navigation in 1915. Now 99 percent completed; the remaining 1 percent covers cost of sub-
merged land.
4 Estimated cost.                   Payments for submerged lands not completed.                                    Cost to Jan. 1, 1932, $3,138,630.58.
570    REPORT OF   CHIEF OF ENGINEERS,     U.   S.   ARMY,   1934


   The tidal influence extends from Mobile 111 miles to Lock No. 1,
where the tidal effect is apparent only at low stages of river. At
Mobile the mean and extreme tidal ranges are 1.4 feet and 3.6 feet,
respectively. These are at times slightly increased by the effect of
winds. The greatest fluctuation of river stages is at Demopolis, Ala.,
the maximum at this point being 59.7 feet. The maximum fluctua-
tions at other points are 40 feet at Lock No. 1, 111 miles from Mo-
bile; 57.8 feet at Tuscaloosa, Ala., 362 miles from Mobile; 25 feet at
Birmingport, 419 miles from Mobile; and 39.3 feet at Cordova, 439
miles from Mobile. The ordinary fluctuations at these points are at
Lock No. 1, 20 feet; at Demopolis, 35 feet; at Tuscaloosa, 40 feet; at
Birmingport, 10 feet; and at Cordova, 15 feet. The works of im-
provement have reduced the amount of fluctuations at different
points from 3 to 10 feet.
   There was no original approved estimate for the existing project.
Estimates for the different parts of this project were made from time
to time and were modified as different items were added to project.
The estimated cost of new work, revised in 1926, is $10,020,000, ex-
clusive of amounts expended on previous projects.
   The latest (1928) approved estimate for annual cost of mainte-
nance is $50,000.
   The original appropriation for the existing project was made July
5, 1884. The report of a board of engineer officers recommending a
project for slack-water navigation was approved by the Secretary
of War April 19, 1887. The River and Harbor Act of March 3, 1899,
provided for the construction of the first locks between Tuscaloosa
and Demopolis; the act of June 13, 1902, merged the individual
projects for the Black Warrior, Warrior, and Tombigbee (below
Demopolis) ; and the act of August 22, 1911, authorized the extension
to its final limits (Annual Reports for 1887, p. 1302; 1891, p. 1461;
1901, p. 1858; and H. Does. No. 259, 54th Cong., 1st sess.; No. 178,
56th Cong., 2d sess.; No. 72, 62d Cong., 1st sess) ; and the River and
Harbor Act of March 2, 1919, provided for the raising of various
dams 2 feet and raising the lock walls 2 feet at Lock No. 1 to provide
a minimum depth of 8 feet at low water; also for widening the chan-
nel to 150 feet where practicable (Annual Report for 1918, p. 876).
   The latest published map for the Tombigbee River and tributaries
is published in House Document No. 56, Seventy-third Congress, first
session, for the Warrior River, Annual Report for 1911, page 1702,
and for the Black Warrior River, in Annual Report for 1913, page
2144.
   Recommended modifications of project.-Under date of October
17, 1932, the Chief of Engineers recommended modification of the
existing project for the improvement of the Warrior, Black Warrior,
and Tombigbee Rivers so as to provide for the abandonment of the
project for the slack-water improvement of the Tombigbee River
above Demopolis, and to provide for a depth of 9 feet, and a width
of 200 feet, where practicable, from the mouth of Tombigbee River
to mile 457 on the Sipsey Fork, mile 454 on the Mulberry Fork, and
mile 430 on the Locust Fork, by dredging a cut-off channel 9 feet
deep, 150 feet wide, and 2.4 miles long in the vicinity of Sunflower
Bend; by installing temporary flashboards on Dams Nos. 1 to 12,
inclusive, and raising existing Dams Nos. 13 to 16, inclusive, each
1 foot; by the construction of crest gates 12 feet high on Dam No.
          RIVERS AND HARBORS-MOBILE,        ALA.,   DISTRICT      571
17; and by dredging shoals as required, at an estimated cost of
$690,000, with $65,500 annually for maintenance in addition to that
now required, subject to certain conditions of local cooperation
 (H. Doc. No. 56, 73d Cong., 1st sess.).
   Under date of January 27, 1931, the Chief of Engineers recom-
mended modification of the existing project so as to provide for the
removal of snags, rocks, fallen trees, bank slides, and other obstruc-
tions from Mobile River from the mouth of Chickasaw Creek to the
junction of the Alabama and Tombigbee Rivers, at an estimated
annual maintenance cost of $2,500 (H. Doc. No. 728, 71st Cong., 3d
sess.).
   Under date of June 5, 1934, the Chief of Engineers recommended
that the conditions of local cooperation, recommended in House Doc-
ument No. 56, Seventy-third Congress, first session, should be modi-
fied so as to provide that flowage easements, required because of the
construction of the crest gates on Dam No. 17, shall be donated
without cost to the United States in those cases where the Chief of
Engineers finds that the direct benefits to the owners of the parcels
because of the improvement exceeds the value of the flowage (Riv-
ers and Harbors Committee, Doc. No. 45, 73d Cong., 2d sess.).
   Terminal facilities.-Facilities,comprising loading and transfer
stations, wharves, etc., have been provided along this waterway.
   All are privately owned and operated except the terminals at
Tuscaloosa and leased to a private company, but serves the general
public, and terminals at Miles 367 and 419 are owned and operated
by the Inland Waterways Corporation and serve the general public.
These terminals are adequate for the present commerce.

             OPERATION AND RESULTS DURING FISCAL YEAR


  Regular funds.-From July 1, 1933, to April 30, 1934, the U. S.
pipe-line dredge Blackwoater removed 70,912 cubic yards of material
from the Tombigbee River below Lock No. 1. The U. S. pipe-line
dredge Pettus, from August 14 to. 17, 1933, removed 26,925 cubic
yards of material from the Tombigbee River below Lock No. 1.
From July 1, 1933, to June 17, 1934, the U. S. snag boat R. C. Mc-
Calla removed 179 obstructions and the snag boat Montgomery re-
moved 30 obstructions and 825 cubic yards of material from the
channel of the Tombigbee River, below Lock No. 1. The cost was
$17,247.27, charged to maintenance. The total expenditures were
$31,627.48.
  Public Works funds.-Supplementing the work authorized by Con-
gress, rock removal and snagging was carried on with funds pro-
vided by the Public Works Administration. From October 1, 1933,
to June 26, 1934, the quarterboat U and hired labor removed 37,587
obstructions from the Warrior River, Ala., above Dam No. 17.
From September 27, 1933, to June 30, 1934, the derrick boats Talla-
hatta, Tallawampa, and Pearl, operated by hired labor, removed
17,547 cubic yards of rock from the Warrior River, Ala. The cost
of the work accomplished with Public Works funds was $79,218.65,
charged to new work. The expenditures were $75,424.28.
  The total cost, all funds, was $96,465.92-$79,218.65 for new work
and $17,247.27 for maintenance. The total expenditure was
$107,051.76.
572       REPORT        OF CHIEF OF ENGINEERS,         U.   S.   ARMY,       1934


   Condition at end of fiscal year.-The project is 99 percent com-
pleted. Seventeen locks and dams have been built (see table under
Existing project, p. 569); the channel has been dredged, original
snagging completed, and principal lock houses built at all locks. The
project depth of 8 feet over a minimum width of 100 feet obtains
throughout the entire length of the improvement, and all-year navi-
gation for boats is possible to the extent of the channel dimensions.
The work remaining to be done consists of the payment for sub-
merged land above Dam No. 17. The total cost was $10,385,992.39,
of which $9,879,595.81 was for new work and $506,396.58 was for
maintenance. The total expenditures were $10,384,249.19. In addi-
tion the cost of the work accomplished with Public Works funds
was $79,218.65, charged to new work. The expenditures were
$75,424.28.
   The total cost, all funds, was $10,465,211.04-$9,958,814.46 for new
work and $506,396.58 for maintenance. The total expenditures were
$10,459,673.47.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $54,372.52, will be applied as follows:
Accounts payable-------------------------$1, --------------------  $1,743.20
New work : Payment for lands submerged by backwater
  above Dam No. 17, Black Warrior River--------------- $4, 000. 00
Maintenance (by United States plant and hired labor):
    Dredging in river channel below Dam No. 1 with
      U. S. pipe-line dredge Pettus, 20 days in August
      1934 and with a U. S. pipe-line hydraulic dredge
      21   months (July-September 1934), at $15,000
       per month_-----------------                                42;, 629. 32
      Snagging below Dam No. 1 with U. S. snagboat
        Montgomery, 15 days in July 1934 and 30 days in
        May 1935, at $4,000 per month---                              000. 00
                                                                   6-----------------,
                                                                            - 52, 629. 32

       Total-------------------------------------------54,                             372.: 52
   The unexpended bal ance and accounts receivable at the end of the
fiscal year from allotment from the National Industrial Recovery
Act of June 16, 1933, $6,102.83, will be applied as follows:
Accounts payable ----------------------------------                              $5, 321. 48
New work: Surveys and inspections-------------------------------                     781. 35

       Total-----                                                  ------             , 102. 83
                                                                                     6--------------------------
  An additional sum of $50,000 can be profitably expended during
the fiscal year 1936, as follows:
New work: Payment for land submerged by backwater above Dam
No. 17------------------------------------- -------------- $4, 000
Total for new work----------------------------------------------4,                          000
Maintenance (by United States plant and hired labor):
    Dredging in river channel below Dam No. 1 With U. S.
      pipe-line dredge, 22/3 months, at $15,000 per month ------- $40, 000
    Snagging below Dam No. 1 with U. S. snagboat Mont-
      gomery, 11 months at $4,000 per month-------------_           6, 0000
       Total maintenance-----------------------------------------                      46, 000
       Grand total-         - --     ---   _-_-_- --                     -       -     50, 000
                 RIVERS AND           HARBORS--MOBILE,                    ALA.,       DISTRICT                      573
                                    Cost and financial summary

                             MAINTENANCE        AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934________ _______                    $10,486,526. 59
Cost of maintenance to June 30, 1934___---------------------           1556, 396. 58
      Total cost of permanent work to June 30, 1934_ ...     ____-   11, 042, 923. 17
Minus accounts payable June 30, 1934___  ---      --------         ------ 1, 743. 20
                                     ---     -
      Net total expenditures_ _ ___________-----        -      -     11, 041, 179. 97
Unexpended balance June 30, 1934 _____           -________----            54, 372. 52
      Total amount appropriated to June 30, 1934_----------- 11, 095, 552.49,

        Fiscal year ending June 30                 1930           1931           1932            1933             1934


Cost of new work____                            $20,828.23     $28, 879. 77   $38, 675. 96   $40, 503. 84     ............
Cost of maintenance....__________________        18, 701. 98    18, 991. 14    19, 637. 50     29, 360. 04    1 $17, 335.98

      Total cost__________________________       39, 530. 21    47, 870. 91    58, 313. 46    69, 863. 88        17, 335. 98

Total expended ____       ___________________    47, 771. 14    39, 317. 24    64, 805. 17    57, 007. 32        31, 627. 48
Allotted__________       ____________________    44, 500. 00    51, 000. 00    19, 745. 84   102, 000. 00         8, 108. 32

  1Increased $88.71 pro rata share of cost of maintaining idle Government plant in the Gulf of Mexico divi-
sion, fiscal year 1933.

Balance unexpended July 1, 1933____-__                                                                   $77, 891. 68
Amount alloted from War Department Appropriation Act ap-
  provred Apr. 26, 1934-------------------------------------                                                 20, 000. 00

      Amount to be accounted for----------____-------------                                                  97, 891. 68.
Deduc tions on account of revocation of allotment---                                                             891. 68
                                                                                                             11,----------11,

      Net amount to be accounted for_                                                                        86------------------------
                                                                                                             86, 000. 00
Gross amount expended_____________---------------------                                                      31, 627. 48

       Balance unexpended June 30, 1934----------------------                                                54, 372. 52
Outstainding liabilities June 30, 1934                                                                         , 743. 20
                                                                                                              1-------------------------

         Balance available June 30, 1934----------------------                                               52, 629. 32
Amount (estimated) required to be appropriated for completion
                               2
of existing project ---- _________________________________                                                  50, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1936:
   For new work "                                                                                             4, 000. 00
   For maintenance 2- _____________________________________                                                  46, 000. 00

         Total 2 - - -   --- --- -- --- --- --- --- -- --- -- --- -- -- - -- --- -- --
                                                                                                             50, 000. 00.
                                         PUBLIC WORKS FUNDS

Cost of new work to June 30, 1934 _.______________________                                                   79, 218. 65
Cost of maintenance to June 30, 1934___
      Total cost of permanent work to June 30, 1934                           ----------                     79, 218. 65
Plus accounts receivable June 30, 1934____________________                                                    1, 527. 11
      Gross total costs to June 30, 1934______________________                                               80, 745. 76
Minus accounts payable June 30, 1934_______________________                                                   5, 321. 48
      Net total expenditures---------------------------75,                                                       424. 28
Unexpended balance June 30, 1934-------------------------                                                     4, 575. 72
      Total amount appropriated to June 30, 1934________       -_                                            80, 000. 00
  x Increased $88.71 pro rata share of cost of maintaining idle Government plant in the
Gulf of Mexico division, fiscal year 1933.
  2 Exclusive of available funds.
574             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                     1934


          Fiscal year ending June 30                        1930            1931           1932             1933            1934


Cost   of new   work                      ---      -             -$79,                                                        218. 65
Cost ofmaintenance --                                     -- ---.....-
Total expended------           -           _                                             -75,                                 424. 28
Allotted_                                                                                          -80,                       000. 00



Amount allotted from National Industrial Recovery Act,
  approved June 16, 1933-------------------  ---------------                                                        $80, 000. 00
Gross amount expended ____________-______-_____     -75,                                                                 424.28

      Balance unexpended June 30, 1934________---- _______                                                              4, 575. 72
Outstanding liabilities June 30, 1934_____________-__------                                                             5, 512. 15
      Balance available June 30, 1934 _______-936.                                                                             43
Accounts receivable June 30, 1934-------------------------                                                              1,527. 11

          Unobligated balance available June 30, 1934____ .____                                                            590. 68

       CONSOLIDATED COST AND FINANCIAL SUMMARY FOR WARRIOR RIVER SYSTEM

Cost of new work to June 30, 1934-_- -_--    __-______-__---                                                 $10, 565, 745.24
Cost of maintenance to June 30, 1934_____________________-___                                                   1556,396. 58

      Total cost of permanent work to June 30, 1934_ _______                                                   11, 122, 141. 82
Plus accounts receivable June 30, 1934 ________--_________--                                                         1,527. 11

     Gross total costs to June 30, 1934 .----.----------    - 11, 123, 668. 93
Minus accounts payable June 30, 1934 ----------------------         7, 064. 68
     Net total expenditures__--____-- __---------------                                                        11, 116, 604. 25
Unexpended balance June 30, 1934_________________________                                                           58, 948. 24
          Total amount appropriated to June 30, 1934----------                                                11, 175, 552. 49

          Fiscal year ending June 30                        1930            1931           1932             1933            1934


Cost of new work  -------------------- $20, 828. 23                      $28, 879. 77   $38, 675. 96   $40, 503. 84      $79, 218. 65
Cost of maintenance-------------------  18, 701. 98                       18, 991. 14    19, 637. 50    29, 360.04       1 17, 335. 98
       Total cost _            .-----------.-----------   39, 530. 21     47, 870. 91    58, 313. 46      69, 863. 88     96, 554. 63

Total expended-----------------------                     47, 771. 14     39, 317. 24    64, 805. 17      57, 007. 32    107, 051. 76

Allotted ---    ----------   ------------------.          44, 500. 00     51, 000. 00    19, 745. 84   102, 000. 00       88, 108. 32

xIncreased $88.71 pro rata share of cost of maintaining idle Government plant in the
Gulf of Mexico division, fiscal year 1933.
                RIVERS AND IIARBORS-MOBILE, ALA.) DISTRICT                                                 575
Balance unexpended July 1, 1933__.                                                                 $77, 891. 68
Amount allotted from War Department Appropria-
tion Act approved Apr. 26, 1934   -------------- $20, 000. 00
Amount allotted from National Industrial Re-
covery Act approved June 16, 1933__------------   80, 000. 00
                                                                                                    100, 000. 00

      Amount to be accounted for _      -    -______-
                                                  --                                -__-            177, 891. 68
Deduc tions on account of revocation of allotment-..--                                 ---         - 11, 891. 68
      Net amount to be accounted for- --                           __--..        -
                                                                          -___-___-                166, 000. 00
Gross amount expended----_-----------                              -------------                   107, 051. 76

       Balance unexpended June 30, 1934 .---------------                                           - 58, 948. 24
Outsta nding liabilities June 30, 1934___-------------------                                          7, 255. 35
      Balance available June 30, 1934_____________________                                            51, 692. 89
Accou ats receivable June 30, 19341___-  -__--- --  -   -                                          -1, 527. 11

         Unobligated balance available June 30, 1934__--------                                       53, 220. 00

Amount (estimated) required to be appropriated for completion
  of existing project        1------------------                                                     50, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1936:
   For new work 1 - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -      --
                                                                                                      4, 000. 00
                          - - -- - - -   - - - - - - - - - - - - - -- - - - - - - - - - - -
   For maintenance 1- - -                                                                            46, 000. 00
                              -      - - -- - -- - -- - -- - -- - -- - -- - -- -- - -- - -- - -
          Total 1 _                                                                                 50, 000. 00

  17. TOMBIGBEE RIVER, FROM DEMOPOLIS,                                         ALA., TO WALKERS
                                                   BRIDGE, MISS.

   Location.-The source of this river is in northeastern Mississippi,
and it flows in a southeasterly direction. Its mouth is 45 miles
above Mobile Bay, where its junction with the Alabama River forms
the Mobile River. Its total length is about 503 miles. (See U. S.
Geological :Survey maps of Alabama and Mississippi.)
   Previous projects.-Work between Demopolis and Columbus was
commenced in 1871 and modified in 1879. For the section above
Columbus there are no previous projects. The total cost and ex-
penditure on the section between Demopolis and Columbus was $63,-
382.98, of which $47,342.98 was for new work and $16,040 was for
maintenance. For further details see page 1842, Annual Report
for 1915.
   Existing project.-This provides for securing a channel 6 feet
deep at low water by snagging, tree cutting, bank revetment, bar
improvement, and the construction of locks and dams from Demop-
olis to Columbus, 149 miles. The distance from the lower end of
project at Demopolis to the mouth is 185 miles. The present project
for the section from Columbus to Walkers Bridge, 169 miles, pro-
vides for securing a high-water channel by the removal of obstruc-
tions. This part of the improvement was formerly divided into two
sections, but later appropriations were made for the work as one
improvement. The extreme fluctuation is 59.7 feet at Demopolis,
45.9 feet at Columbus, and 42.1 feet at Aberdeen.
   Exclusive of amounts expended on previous projects, the original
estimate of the cost of new work for the section between Demopolis
   1Exclusive of available funds.
       91536-ENG 1934-37
576    REPORT   OF CHIEF OF   ENGINEERS,   U. S. ARMY,   1934

and Columbus was $779,400, including lock and dam construction,
and $28,500 for annual maintenance. The latest estimate, made in
1916, and found in House Document No. 1137, Sixty-fourth Con-
gress, first session, increased these amounts to $4,500,000 for lock
and dam construction and $90,000 for annual maintenance, but no
provision has yet been made by Congress for lock and dam con-
struction. The original estimate for the section above Columbus was
$47,000 for new work and $6,500 for annual maintenance. The
latest (1928) approved estimate provides only for the removal of
snags above Demopolis at an annual cost of $5,000, the present com-
merce not warranting an annual expenditure in excess of this sum.
   The existing project was authorized by the following river and
harbor acts: The act of September 19, 1890, provided for the im-
provement and maintenance of the section between Columbus and
Demopolis (H. Doc. No. 156, 51st Cong., 1st sess., and Annual Re-
port for 1890, p. 1719); the acts of March 3, 1873, and August 11,
1888, provided for the improvement and maintenance of that part
of the waterway between Columbus and Walkers Bridge (Annual
Reports for 1873, p. 548, and 1882, p. 1312) ; and the act of February
27, 1911, consolidated the improvement from Demopolis to Walkers
Bridge under one head and made one appropriation for this section.
Since 1911 work has been restricted to improvement at and below
Aberdeen. There are no published maps.
   Reconended mnodifications of project.-Under date of May 15,
1916, the Chief of Engineers recommended that this project be mod-
ified to provide for snagging only at an estimated cost of $15,000
annually. (H. Doc. No. 1137, 64th Cong., 1st sess.)
   Under date of October 17, 1932, the Chief of Engineers recom-
mended the abandonment of the project for the slackwater improve-
ment of the Tombigbee River above Demopolis (H. Doc. No. 56, 73d
Cong., 1st sess.).
    Terminal facilities.-There are no terminal facilities along this
waterway and none are required.
    Operations and results during isoal year.-None. There were no
costs and no expenditures.
    Condition at end of fiscal year.-The percentage of the approved
project accomplished from Demopolis to Columbus cannot be stated.
Since 1902 expenditures have been applied to maintenance under
existing projects for the entire section. For a distance of 119 miles
above Aberdeen navigation is impracticable except for rafting at
mean and high water. From Aberdeen to Columbus, about 50
miles, navigation is possible at high-water stages, but dangerous
on account of rapid fluctuation. From Columbus to Demopolis,
149 miles, navigation for about 4 months each year is comparatively
safe at mean and high stages for river steamers with a draft of
5 feet. The controlling depth at low water is about 1 foot and
navigation is confined to small craft. The total costs and expend-
itures have been $356,151.59, of which $150,307.73 was for new work
and $205,843.86 for maintenance.
    Proposed operations.-No funds are available.
    The amount of $3,000 can be profitably expended during the
fiscal year 1936 in the operation of one United States snagboat
about 1 month at such time as required by the needs of traffic.
                  RIVERS         AND      HARBORS-MOBILE,                           ALA.,      DISTRICT                 577
                                       Cost anfd financial summary

Cost of new work to June 30, 1934---------------------------- $197, 650.71
Cost of maintenance to June 30, 1934-------------------------221, 883. 86
      Total cost of permanent work to June 30, 1934------------ 419, 534. 57
Net total expenditures__ ___       __________-----              419,534. 57
Total amount appropriated to June 30, 1934-------------------- 419, 534. 57

           Fiscal year ending June 30                       1930            1931            1932        1933           1934


Cost of new work.-----                ..------------------------
Cost of maintenance------------------                                     $1, 575. 74

Total expended-         -------------------          -----------            1, 575. 74
Allotted                    .......---------------
                     .-------------                    $5, 000. 00          2, 500. 00 -$2, 315. 46


Balance unexpended, July 1, 1933---------------------------------    $2, 500
Deductions on account of revocation of allotment---------   -------- 2, 500

Amount that can be profitably expended in fiscal year ending June 30,
1936, for maintenance-------------------- ----------------------                                                      3, 000

18. OPERATING AND CARE OF LOCKS AND DAMS ON BLACK WARRIOR,
            WARRIOR, AND TOMBIGBEE RIVERS, ALA.

  The improvement for which report is made under this caption
forms part of the project for Black Warrior, Warrior, and Tombig-
bee Rivers, Ala. See pages 568-55, where general information
regarding the improvement can be found. The completed locks and
dams have been operated and maintained under the permanent
indefinite appropriation since the following dates:

                Lock No.                             Date                               Lock No.                      Date


1                                              Sept. 6,1908            10 --------------             --      -    July 1, 1896
2---
3    -
4----------------------------------
                                               Nov.. 1, 1914.
                                               Sept. 21, 1914
                                               Dec. 1, 1908
                                                                   -   11
                                                                       12.
                                                                       13---
                                                                               --
                                                                                  -
                                                                                          ---------------------
                                                                                                      -
                                                                                                                      Do.
                                                                                                                      Do.
                                                                                                                  July 4, 1905
5 ..........     -.-----------------------     Sept. 1,1908            14---                                      M ar. 29, 1910
6------------------------------------          Oct.    1, 1908         15__                                       M ay 2, 1910
7 --       ------------------------            Nov. 7,1903             16        ------         _--     --        Jan. 1, 1915
8 ....- --          ..-----------------------  Jan.    1, 1903         17           _    -_                       May 13, 1915
9---------------             -----------.....---- do .


    Operations and results during fiscal year.-All 17 locks and dams,
telephone line of 186 miles, and other equipment and plants were
operated and maintained by United States plant and hired labor.
Total cost was $365,505.10, total expenditures were $425,431.79.
    Condition at end of fiscal year.-The 17 locks and'dams have been
completed (see table under Existing project, p. 569), and are all open
for traffic to tows 50 feet wide, 280 feet long, and 8-feet draft. Ex-
cept for a few minor repairs all locks are in good condition. The
depth of not less than 8 feet is maintained throughout the canalized
system by the removal of obstructions from the channel and dredg-
ing of bars. The total cost from the permanent indefinite appro-
priation to the end of the fiscal year was $7,829,248.31. The total
expenditures were $8,451,797.21.
578          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                         1934

  Proposed operations.-The locks and dams will be operated and
maintained under allotments from appropriations made available for
such purposes.
                                     Cost and financial summary
Cost of maintenance to June 30, 1934________________________                                   $7, 829, 248. 31
Value of plant, materials, etc., on hand June 30, 1934----------                                   637, 854. 19

      Net total cost to June 30, 1934_____________________                                      8, 467, 102. 50
Plus accounts receivable June 30, 1934_____ ____________--                                          12, 776. 47

      Gross total costs to June 30, 1934_ ____- ______----                                      8, 479, 878. 97
Minus accounts payable June 30, 1934_____________________                                           28, 081. 76

     Net total expenditures __----------------------------                                      8, 451, 797. 21
Unexpended balance June 30, 1934_______________------(                                              62, 860. 73

           Total amount appropriated to June 30, 1934------------                               8, 514, 657. 94

   Fiscal year ending June 30           1930            1931            1932            1933              1934


Cost of new work-------------
Cost of maintenance-------           $468, 227. 60   $511, 794. 65   $466, 871. 53   $378, 972. 99      $365, 990. 56

Total expended.------------------     465, 675. 00    467, 810. 96    522, 380. 33    424, 022. 71       425, 431. 79

Allotted            .
            ---------------------     390, 000. 00    513, 400. 00    530, 000. 00    365, 202. 70       388, 271. 47


Balance unexpended July 1, 1933-__-------_----------------__     $100, 021.05
Amount allotted from permanent indefinite appropriation, sec. 6,
  River and Harbor Act, Mar. 3, 1909--  ___-------__              413, 339. 07
      Amount to be accounted for-------------------------------                                      513, 360. 12
Deductions on account of impounded funds revoked___---                                                25, 067. 60

       Net amount to be accounted for________--_______                                               488, 292. 52
Gross amount expended-          -______--------------     $527, 073. 76
Less :
    Reimbursements collected ---------- $100, 210. 29
    Receipts from sales -1,                       431. 68
                                                           101, 641.97
                                                                                                     425, 431. 79

      Balance unexpended June 30, 1934---------------------                                           62, 860. 73
Outstanding liabilities June 30, 1934 ____--
                                          -----   --  __ --                                           36, 228.36

      Balance available June 30, 1934_--- -------------   ___-                                        26, 632. 37
Accounts receivable June 30, 1934_-.--        ______----_-___                                         12, 776. 47

Unobligated balance available June 30, 1934___ -------
Amount allotted for fiscal year 1935- ------------------
                                                                          _-          __       -- 39, 408. 84
                                                                                                 398, 000. 00

           Balance available for fiscal year 1935------------------                                  437, 408. 84

                                    19. BAYOU LABATRE, ALA.

  Location.-This is a tidal stream about 10 miles long, located in
the southwestern part of the State of Alabama, and empties into
Mississippi Sound. It is 45 miles by water from Mobile Harbor,
Ala., on the east, and 18 miles from Pascagoula Harbor, Miss., on
   1Increased $485.46 pro rata share of cost of maintaining idle Government plant in
the Gulf of Mexico division, fiscal year 1933.
           RIVERS AND HARBORS-MOBILE,            ALA.,   DISTRICT          579
the west. The entrance to the bayou from Mississippi Sound is
through the channel across the bar at its mouth. (See U. S. Coast
and Geodetic Survey Chart No. 1267.)
   Existing project.-This provides for a channel 6 feet deep at mean
low water and 100 feet wide across the bar and 6 feet deep and 75
feet wide between the mouth and the county highway bridge, except
where the existing depth is 6 feet or more for a width of at least 50
feet. The length of the channel across the bar is 3,500 feet, and the
section of the bayou included in the project is 21/2 miles in length.
The mean and extreme tidal ranges are 13/4 and 33/4 feet, respectively.
   The estimated cost for new work, made in 1923, was $20,000, with
$5,000 for annual maintenance.
   The existing project was adopted by the River and Harbor Act of
March 3, 1925 (House committee Doc. No. 4, 68th Cong., 1st sess.).
The latest published map is in the project document.
   Local cooperation.-Complied with.
   Terminal facilities.-There are five small wooden wharves, which
are used exclusively in connection with canning factories located
on the bayou. These wharves are considered adequate for existing
commerce.
   Operations and results during fiscal year.-The U. S. pipe-line
dredge Pascagoula, working in the Bayou LaBatre. channel over a
distance of 6,014 feet, from October 1-12, 1933, removed 126,472 cubic
yards of mud and sand, all maintenance. The costs and expenditures
were $6,330.73.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1926 at a saving of $1,369 under the estimated cost. The
project depths and widths have been obtained in the channel in Mis-
sissippi Sound, across the bar at the mouth of the bayou, and in the
bayou up to the county highway bridge. The controlling depths
ascertained during June 1934, were as follows: Mississippi Sound
Channel, 6 feet; Bayou LaBatre Channel, 6 feet. The total costs
were $31,395.14, of which $18,631.29 was for new work and $12,-
763.85 for maintenance. The total expenditures were $31,395.14.
   Proposed operations.-It is proposed to apply the balance unex-
pended at the end of the fiscal year, $2,020.73, to the operation of one
United States hydraulic pipe-line dredge, about one-seventh of a
month, at such time as required by the needs of navigation, on re-
storing project dimensions in this channel.
   An additional sum of $10,000 can be profitably expended during the
fiscal year 1936, in the operation of one United States snagboat
about one-half month at such time as required by the needs of navi-
gation.
                       Cost and financial summary

Cost of new work to June 30, 1934____________________________       $18,631.29
Cost of maintenance to June 30, 1934   __________-------___          12, 763. 85
     Total cost of permanent work to June 30, 1934_ ......   ____    31, 395. 14

Net total expenditures_______________                                31, 395. 14
Unexpended balance June 30, 1934__111111           1111111111111      2, 020. 73

                                               ......
     Total amount appropriated to June 30, 1934-------          .   33, 415. 87
580            REPORT            OF CHIEF OF ENGINEERS,                                 U.   S. ARMY,      1934


           Fiscal year ending June 30                           1930            1931          1932       1933            1934

Cost of new work--.---------------------------------------------------------------                                  -
Cost of maintenance--------------------                        $183. 46        $5, 162. 45    $93. 53    $174. 24       $6, 330. 73
Total expended------------               -------------           133.99        5, 117. 05      725. 46    174.24         6, 330.73
Allotted-----------------------------------                                   10,000.00 -


Balance unexpended July 1, 1933 .__---------------------                                                            $9, 935. 59
Deductions on account of revocation of allotment---------------                                                      1, 584. 13

      Net amount to be accounted for-------------------------                                                        8, 351.46
Gross amount expended----------------------      ----- ---------                                                      , 330. 73
     Balance unexpended June 30, 1934___ -__-_____-______-2,                                                            020. 73
Amount that can be profitably expended in fiscal year ending June
    30, 1936, for maintenance 1_____________                                                                        10, 000. 00

                                     20. PASCAGOULA HARBOR, MISS.

   Location.-This harbor, located along the lower 6.8 miles of Pas-
cagoula River and the lower 4 miles of Dog River, is in the south-
eastern part of the State of Mississippi, about 61 miles by water
from Mobile Harbor, Ala., on the east, and about 44 miles from
Gulfport Harbor, Miss., on the west. (See U. S. Coast and Geodetic
Survey Chart No. 1267.)
   Previous projects.-Appropriations were made for Pascagoula
River by acts of March 2, 1827, May 23, 1828, and February 24, 1832.
The first definite project was adopted by act of June 14, 1880. The
cost and expenditures on previous projects were $1,317,065.76, of
which $904,441.61 was for new work and $412,624.15 for maintenance.
 (For further details see p. 1843 of Annual Report for 1915.)
   Existing! project.-This provides for a through channel of the
maximum dimensions that can be secured by the expenditure of
$283,000, but not exceeding a depth of 25 feet and width of 300 feet
across the outer bar at Horn Island Pass, and thence a depth of 22
feet and width of 225 feet to the railroad bridge at Pascagoula, and
thence a depth of 22 feet and width of 150 feet, increased at sharp
bends, to a point on Dog River 4 miles above its mouth. Under
ordinary conditions the mean tidal range here is 13/4 feet and the
extreme tidal range is 33/4 feet.
   The estimate of cost for new work, revised in 1914, is $283,000,
exclusive of amount expended on previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $5,000
for the outer bar channel at Horn Island Pass and $100,000 for the
channels in the river and through Mississippi Sound.
   The existing project was authorized by the following river and
harbor acts: The act of March 4, 1913, provided for limiting the
channel dimensions subject to local cooperation (H. Doc. No. 682,
62d Cong., 2d sess.) ; the act of March 4, 1915, modified the required
local cooperation and provided for the present channel dimensions
 (Rivers and Harbors Committee Doc. No. 12, 63d Cong., 2d sess.).
    1Exclusive of available funds.
            RIVERS AND HARBORS-MOBILE,               ALA.,   DISTRICT         581
The latest published map of this locality may be found in House
Document No. 211, Fifty-fourth Congress, second session.
    Local cooperation.-Complied with.
    Terminal faicilities.-The municipal wharf on the east side of Pas-
cagoula River has an available dockage of 1,094 feet. The Louis-
ville & Nashville Railroad Co.'s trestle in the Pascagoula River
at Pascagoula, Miss., just north of their bridge, and the Missis-
sippi Export Railroad wharf on the Dog River at Moss Point,
Miss., have an available dockage at 60 and 380 feet, respectively.
The Farnsworth Coal Co. has a wharf on the Pascagoula River,
located just north of the Louisville & Nashville Railroad Co.'s trestle.
All private terminals, together with the municipal wharf, are con-
sidered adequate for existing commerce. (See Port Series, No. 19,
Corps of Engineers.)
    Operations and results during fiscal year.-The U. S. pipe-line
dredge Wahalak, working in the Pascagoula Ship Channel, from
August 9 to 26, 1933, removed 486,005 cubic yards of material, all
maintenance, over a distance of 7,900 feet. From September 5 to 30,
and November 9 to 15, 1933, the U. S. pipe-line dredge Pascagoula
removed 851,697 cubic yards of material, all maintenance, over a
distance of 17,400 feet. The cost was $27,573.72, charged to main-
tenance. The expenditures were $27,781.46.
    Condition at end of fiscal year.-The 21-foot Horn Island Pass
'Channel was completed in the calendar year 1908. The existing proj-
ect, at the end of the fiscal year, was 42.4 percent completed. The
controlling depths, ascertained June 1934, were as follows: Horn
Island Pass, 19 feet; Mississippi Sound Channel, 13 feet, and Pasca-
goula River Channel, 16 feet. The work remaining to be done to
complete the project consists of obtaining such additional depths
:and widths of channel, not exceeding the maximum dimensions, as
may be secured by the total authorized expenditure of $283,000. The
total cost was $733,696.55, of which $103,037.87 was for new work
and $630,658.68 for maintenance.         The total expenditures were
$733,696.55.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $30,218.54, will be applied to the operation of one United
:States hydraulic pipe-line dredge about 11/2 months in the Missis-
sippi Sound Channel at such time as required.
    The additional sum of $50,000 can be profitably expended during
the fiscal year 1936, to be applied to the operation of one United
;States hydraulic pipe-line dredge about 21/2 months at such times
as may be necessary to provide adequate navigation facilities.
                         Cost and financial summary

                                            -$1,
Cost of new work to June 30, 1934 ________ ________---                 007, 479. 48
Cost of maintenance to June 30, 1934------------- -----             1, 043, 282. 83

      Total cost of permanent work to June 30, 1934 _________       2, 050, 762. 31

                       ---
Net total expenditures______________                                2, 050, 762. 31
Unexpended balance June 30, 1934 __________----------
                                                  _ _                   30, 218. 54

      Total amount appropriated to.June   30,   1934____-           2,080, 980. 85
582             REPORT OF CHIEF OF ENGINEERS,                                U.     S.   ARMY,       1934


          Fiscal year ending June 30                       1930       1931           1932          1933            1934


Cost   of new   work------------
Cost of maintenance----------              -------    $24, 475. 75    $777. 61    $40, 781. 28     $459. 51      $27, 573. 72
Total expended----                 ---   _---------------__
                                                        27, 858. 08    686. 80     34, 135. 50    9, 514. 32      27, 781. 46
Allotted ---------------------------- 51, 000. 00 ----------- 51, 075. 83                        30, 000. 00      26, 641. 68


Balance unexpended July 1, 1933-------- -----                  $31, 358.32
Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934        ------------------------------------      28, 000. 00

      Amount to be accounted for---------------------                                            ------        59, 358. 32
Deductions on account of revocation of allotment                                                                   358. 32
                                                                                                                1,-----------

      Net amount to be acounted for-------------------___                                                      58, 000. 00
Gross amount expended-----------------------------------                                                       27, 781.46

          Balance unexpended June 30, 1934----------------------                                               30, 218. 54

Amount (estimated) required to be appropriated for completion of
existing project 1-----------------                             180, 000. 00

Amount that can be profitably expended in fiscal year ending June
                           1
30, 1936, for maintenance ----------------                  ___                                               50, 000. 00

                21. GULFPORT HARBOR AND SHIP ISLAND PASS, MISS.

   Location.-Gulfport Harbor is located on Mississippi Sound in the
southeastern part of the State of Mississippi, about 44 and 90 miles
by water from Pascagoula Harbor, Miss., and Mobile Harbor, Ala.,
respectively, on the east and 78 miles from New Orleans (via the
inside route through Lake Borgne, the Rigolets, Lake Pontchartrain,
and industrial canal) on the west. (See U. S. Coast and Geodetic
Survey Chart No. 1267.)
   Previous projects.-Adopted by acts of March 3, 1899 (H. Doc.
No. 120, 55th Cong., 3d sess.) ; March 2, 1907, February 27, 1911, and
January 21, 1927. (For further details see p. 1846 of Annual Report
for 1915 and p. 857, Annual Report for 1929.)
   The cost of the previous projects was $2,581,310.46, of which
$269,017.92 was for new work and $2,312,292.54 was for mainte-
nance. The total expenditures were $2,561,968.76.
   Existing project.-This provides for a channel 27 feet deep and
300 feet wide across Ship Island bar, a channel 26 feet deep and
220 feet wide through Mississippi Sound, and a depth of 26 feet in
the anchorage basin at Gulfport. Under ordinary conditions the
mean tidal range here is about 13/4 feet and the extreme tidal range
is about 31/ feet.
   The estimate of cost for new work made in 1927 is $200,000, exclu-
sive of amounts expended on previous projects. The latest (1927)
approved estimate for annual cost of maintenance is $185,000.
   The existing project was adopted by the River and Harbor Act
approved July 3, 1930 (H. Doc. No. 692, 69th Cong., 2d sess.). The
latest published map of this locality is in the project document.
   Local coop eration.-None required by law. The Gulf & Ship
Island Railroad Co., however, expended about $1,603,594.53 for the
   1Exclusive of available funds.
           RIVERS AND HARBORS-MOBILE,        ALA.,   DISTRICT      583
formation and maintenance by dredging of the Gulfport Channel
and Anchorage Basin and received from the United States the
contract price of $150,000.
   The sum of $100,000 was appropriated by the State of Mississippi,
the county of Harrison, and the city of Gulfport, of which $50,000
was expended for the construction of a creosoted-pile and stone
breakwater to the south of the anchorage basin, $28,061.73 for main-
tenance and improvement dredging in the Mississippi Sound
Channel, and the remainder, amounting to $21,938.27, for dredging
,outside the limits of the project and adjacent to the anchorage basin.
    Terminal facilities.-The municipal wharf provides a dockage
length of 200 feet. The Gulf & Ship Island Railroad wharf pro-
vides a dockage of 850 feet. The Gulf & Ship Island Railroad pier
provides an available dockage of 3,800 feet. Existing terminals are
considered adequate for present commerce. (See Port Series No.
19, Corps of Engineers.)
             OPERATIONS AND RESULTS DURING FISCAL YEAR

   Regular funds.-The U. S. pipe-line dredge Pascagoula, working
in the Gulfport Ship Channel from July 1 to September 4, 1933, over
a distance of 49,532 feet, removed 1,788,633 cubic yards of mud and
sand. The U. S. pipe-line dredge Wa:halak, working in the Gulfport
Ship Channel from March 19 to June 30, 1934, over a distance of
34,033 feet, removed 2,589,393 cubic yards of mud and sand. All of
the above work was maintenance. The cost for the fiscal year was
:$94,154.41, of which $3.16 was new work and $94,151.25 was mainte-
nance. The expenditures were $89,363.90.
   Public Works funds.-The following new work was accomplished
with funds provided by the Public Works Administration. The
pipe-line dredge Bisso, working in the Gulfport Anchorage Basin,
under contract, from October 24, 1933, to June 30, 1934, over a dis-
tance of 13,370 feet, removed 448,109 cubic yards of mud and sand.
The cost was $42,607.69. The expenditures were $37,148.97.
   The total cost for the year, all funds, was $136,762.10-$42,610.85
for new work and $94,151.25 for maintenance. The total expendi-
tures were $126,512.87.
   Condition at end of fiscal year.-The existing project is 99 percent
completed. The remaining work to be done is dredging to the proj-
ect depth a small portion of the Gulfport Anchorage Basin. The
controlling depths at mean low water ascertained during June 1934
are as follows: Ship Island Bar Channel, 27 feet; Mississippi Sound
Channel, 25 feet; Anchorage Basin, 26 feet. The total cost was
$310,773.80, of which $70,427.77 was for new work, and $240,346.03
for maintenance. The total expenditures were $313,559.21. In ad-
dition the costs and expenditures for new work accomplished with
National Industrial Recovery Act funds were $42,607.69 and $37,-
148.97 respectively.
   The total cost, all funds, was $353,381.49-$113,035.46 for new
work and $240,346.03 for maintenance. The total expenditures were
$350,708.18.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $144,636.10, will be applied as follows:
584            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                     1934

Accounts payable ---------------------------------------------     $16, 556. 23
Maintenance: Dredging by United States plant or by contract to re-
  move shoaling in the Mississippi Sound Channel (between July
  1, 1934, and June 30, 1935) ---------------------------------- 128, 079. 87

           Total--------------------------------------------------                                                 144, 636. 10
  The balance unexpended and the accounts receivable at the end
of the fiscal year, $12,987.66, from an allotment from the National
Industrial Recovery Act of June 16, 1933, will be applied to the
completion of dredging in the anchorage basin by contract, the esti-
mated date of completion of which is August 10, 1934.
  The additional sum of $140,000 can be profitably expended during
the fiscal year 1936, as follows:
Maintenance:
   Dredging by United States plant or by contract to remove the
     shoaling in the Mississippi Sound Channel, as required by the
      needs of navigation---------------------------___ __$125,                                                               000
   Operation of 1 United States sea-going hopper dredge in the
      Ship Island Pass Channel, about one-half month when required
     by the needs of navigation------------------------------                                                          15, 000

           Total-----------------------------------------------------                                                 140, 000

                                             Cost and financia summary
                                      MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934----------------------------                                                  $339, 445. 69
Cost of maintenance to. June 30, 1934------------------------                                                22, 552, 638. 57
     Total cost of permanent work to June 30, 1934----------                                                  2, 892, 084. 26
Minus accounts payable June 30, 1984-----------------------                                                       16, 556. 23
     Net total expenditures______-------                                                                      2, 875, 528. 03
Unexpended balance June 30, 1934_.............                                           __.                     144, 636. 10
           Total amount appropriated to June 30, 1934-                                                        3, 020, 164. 13

    Fiscal year ending June 30                     1930               1931             1932           1933             1934

Cost of new work---___   .....-----      __-            ......---.---.           .   $69, 493. 22      $931. 39             $3. 16
Cost 6ofmaintenance----------....              $102, 817. 57        $113, 974. 09     58, 178. 54    88, 016. 24       94, 151. 25

       Total cost      ---------------          102, 817. 57       113, 974. 09      127, 671. 76    88, 947. 63       94, 154. 41
Total expended         __------- ---------       92, 614. 99       133, 732. 23      142, 834. 45    81, 360. 92       89, 363. 90
Allotted...       ..                       .
                          ........---------------------..
                                                 150, 000. 00      123, 000. 00       30, 000. 00   155, 000. 00      113, 943. 30


Balance unexpended July 1, 1933 _------_                          $120, 056. 70
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934----------------------- $82, 000. 00
Amount allotted from War Department Appropriation
Act approved July 14, 1932 _____-----        - -____ 30, 312. 57
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933_-         --
                                   _____-----          1, 630. 73
                                                                   113, 943. 30

Amount to be accounted for- -________-- -______--    __-_____                                                      234, 000. 00
Gross amount expended__ ______-----  -    ____-_______   -89,                                                           363.90

           Balance unexpended June 30, 1934--__--------                                                            144, 636. 10

    SIncreased $3.16 due to pro rata share of maintaining idle Government plant.
      Increased $292.47 due to pro rata share of maintaining idle Government plant.
                     RIVERS AND HARBORS-MOBILE,                                          ALA.,    DISTRICT              585

Outstanding liabilities June 30, 1934                                ------------------------                   $16, 556. 23

          Balance available June 30, 1934_______________---                                                     128, 079. 87

Amount that can be profitably expended in fiscal year ending June
                           1  - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
30, 1936 for maintenance                                                                                       140, 000. 00
                                                  PUBLIC WORKS FUNDS

Cost of new work to June 30, 1934-----------------------_                                                       $42, 607. 69
Cost of maintenance to June 30, 1934     ---------------------------------

      Total cost of permanent work to June 30, 1934------------                                                  42, 607. 69
Plus accounts receivable June 30, 1934 ______________----------_                                                     136. 57

     Gross total costs to June 30, 1934------------------------                                                  42, 744. 26
Minus accounts payable June 30, 1934------------------------                                                      5, 595. 29

     Net total expenditures____--_---------------------                                                          37, 148. 97
Unexpended balance June 30, 1934_  ------                                                                        12, 851. 03

          Total amount appropriated to June 30, 1934 __-__________                                               50, 000. 00

          Fiscal year ending June 30                          1930            1931           1932        1933         1934


Cost of new work    .....---------------------------------------------------------                                  $42, 607. 69
Cost of maintenance       ----- --                 -------------- -------            -      -------                  ---
Total expended--           -----        ----         -------------------------------------------                    37, 148. 97
Allotted---                                        ---------
                                .----------------------------                            ------       -----------   50, 000.00

Amount allotted from National Industrial Recovery Act approved
  June 16, 1933-----------------------------------------                                                         50, 000. 00
Gross amount expended___     ____        _____------------------------$37, 418. 05
Less reimbursements collected-    ------------                             269. 08
                                                                                                                 37, 148. 97

      Balance unexpended, June 30, 1934----------------------                                                    12, 851. 03
Outstanding liabilities, June 30, 1934 --------------------_                                                     12, 621.44

      Balance available, June 30, 1934_-.-...                                        _____-______-                   229. 59
Accounts receivable, June 30, 1934__                                                                                 136. 57

          Unobligated balance available, June 30, 1934--------------                                                 366. 16

   CONSOLIDATED            COST AND FINANCIAL SUMMARY FOR GULFPORT HARBOR AND SHIP
                                        ISLAND PASS, MISS.

Cost of new work to June 30, 1934                                                                           2 $382, 053. 38
Cost of maintenance to June 30, 1934----------------------                                                 32, 552, 638. 57

      Total cost of permanent work to June 30, 1934---------- 2, 934, 691. 95
Plus accounts receivable, June 30, 1934-----------------------        136. 57

     Gross total costs to June 30, 1934--------------------                                                 2, 934, 828. 52
Minus accounts payable, June 30, 1934------------------------                                                   22, 151. 52

          Net total expenditures----- -----------------------                                               2, 912;, 677. 00
UTnexpended    balance, June 30, 1934--------------------------                                                157, 487. 13

          Total amount appropriated to June 30, 1934-------------3, 070, 164. 13

   1Exclusive of available funds.
   2Increased $3.16 due to pro rata share of maintaining idle Government plant.
    Increased $292.47 due to pro rata share of maintaining idle Government plant.
586         REPORT OF CHIEF OF ENGINEERS,                                 U.    S. ARMY,          1934


   Fiscal year ending June 30           1930                 1931           1932           1933             1934


Cost of new work _____________                       __                   $69, 493. 22      $931. 39       $42, 610. 85
Cost of maintenance-..-.- -...       $102, 817. 57        $113, 974. 09    58, 178. 54    88, 016. 24       94, 151.25
       Total cost.---------------     102, 817. 57         113, 974. 09   127, 671. 76    88, 947. 63       136, 762. 10
Total expended----------------         92, 614.99          133, 732. 23   142, 834. 45    81, 360.92       126, 512. 87
Allotted_--- ----------     --   _    150, 000. 00         123, 000. 00    30, 000. 00   155, 000. 00       163, 943. 30


Balance unexpended July 1, 1933-----------------------------$120, 056. 70
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934----------------------  $82,000.00
Amount allotted from War Department Appropriation
  Act approved July 14, 1932------------------       30, 312. 57
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933---------------------___   1, 630. 73
Amount allotted from National Industrial Recovery
  Act approved June 16, 1933------------------------50, 000.00
                                                                 163,943.30

Amount to be accounted for--------------------------------                                              284, 000. 00
Gross amount expended--------------------------- 126, 781.95
Less reimbursements collected----------------------    269. 08
                                                                                                        126, 512. 87

      Balance unexpended June 30, 1.934------------------------                                         157, 487. 13
Outstanding liabilities June 30, 1934---------------------------                                         29, 177. 67

      Balance available June 30, 1934-------------------------128,309.46
Accounts receivable June 30, 1934_------------------------------    136. 57

         Unobligated balance available June 30, 1934--------------                                      128, 446. 03

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1---------------------- ------------ 140, 000. 00

                                 22. BILOXI HARBOR, MISS.

   Location.--Located on the Mississippi Sound in the southeastern
part of the State of Mississippi. It is 32 miles by water from Pas-
cagoula Harbor, Miss., on the east, and 14 miles from Gulfport
Harbor, Miss., on the west. (See U. S. Coast and Geodetic Survey
Chart No. 1267.)
   Previous projects.-Adopted by acts of August 2, 1882, and July
5, 1884. The cost of the previous project was $130,691.80, of which
$44,382.27 was for new work and $86,309.53 was for maintenance.
The total expenditures were $129,859.05. (For further details see
p. 1846 of Annual Report for 1915 and p. 863 of Annual Report for
1929.)
   Existing project.-This provides for a channel west of Deer Island
10 feet deep and 150 feet wide from the 10-foot contour in Mississippi
Sound to the south water front of the city of Biloxi, and thence
north of Deer Island to deep water in Back Bay of Biloxi. Under
ordinary conditions the mean tidal range is about 13/4 feet.
   The estimate of cost for new work made in 1927 was $82,000, exclu-
sive of amounts expended on previous projects but including $30,500
to be contributed by local interests. The latest (1927) approved
estimate for annual cost of maintenance is $18,500.
  1
      Exclusive of available funds.
          RIVERS AND    IHARBORS--MVOBILE,   ALA., DISTRICT       587
  The existing project was adopted by the River and Harbor Act
approved July 3, 1930 (H. Doc. No. 754, 69th Cong., 2d sess.).
The latest published map of this locality may be found in the project
document.
  Local cooperation.-The act adopting the existing project provides
that local interests shall construct a public terminal adequate for
coastwise traffic, under plans to be approved by the Chief of
Engineers, and contribute $30,000 toward the- first cost of the
improvement.
  The above provisions were modified as follows by the War Depart-
ment Appropriation Act of February 23, 1931:
  "That the conditions imposed upon the improvement of Biloxi
Harbor, Miss., authorized to be carried out in accordance with the
report submitted in House Document No. 754, Sixty-ninth Congress,
second session, may, in the discretion of the Chief of Engineers of
the Army and the Secretary of War, be modified so as to provide
that the local interests shall give assurances that they will construct
a public terminal adequate for coastwise traffic, under plans to be
approved by the Chief of Engineers of the Army, whenever in his
opinion such construction is necessary, and that such local interests,
in the event of modification of such conditions, shall contribute
therefor at least $5,000 toward the first cost of the improvement and
at least $5,100 annually thereafter for five successive years." The
initial payment of $5,000 has been made, and assurances given as
required by the act.
  Terminal facilities.-Consistof a number of light timber wharves
owned by private parties but available to the public without charge.
These are considered adequate for the present commerce.
   Operations and results during fiscal year.-The U. S. pipe-line
dredge Pascagoula,working in the Biloxi Ship Channel from Octo-
ber 13, to November 8, 1933, over a distance of 13,290 feet, removed
484,677 cubic yards of mud and sand. The cost was $9,575.21 from
United States funds and $5,000 from contributed funds, a total of
$14,575.21, charged to maintenance. The total expenditures were
$14,602.27, of which $9,602.27 were United States funds and $5,000
were contributed funds.
  Condition at end of fiscal year.-The project was completed in
1932 at a saving of $43,088 under the estimated cost. The controlling
depth ascertained June 1934 was 8 feet. The cost under the existing
project was as follows: From United States funds $33,353.35 for
new work and $13,148.24 for maintenance, a total of $46,501.59.
From contributed funds $5,000 for new work and $10,200 for mainte-
nance, a total of $15,200. The total expenditures were $62,534.34,
of which $47,334.34 were United States funds and $15,200 contrib-
uted funds.
  Proposed operations.-It is proposed to apply the balance unex-
pended at the end of the fiscal year, $351.16, and the amount of
$5,100, due from local interests, to the operation of one United States
hydraulic pipe-line dredge about 1/4 month when required by the
needs of navigation.
  The additional sum of $37,000, including $5,100 due from local
interests, can be profitably expended during the fiscal year 1936, to
be applied to the operation of one United States hydraulic pipe-line
588          REPORT                  OF CHIEF     OF ENGINEERS,             U.     S. ARMY,           1934


dredge about 2 months, at such times as may be required by the needs
of navigation.
                                             Cost and financial summary

Cost of new work to June 30, 1934__-----------------------------                                           $77, 735. 62
Cost of maintenance to June 30, 1934__________________________                                             2 9, 457. 77

           Total cost of permanent work to June 30, 1934_..____...                                          177,193. 39
Net total expenditures____________________________                                                     177. 193. 39
Unexpended balance June 30, 1934__ ____________                                                 -_______-- 351. 16

           Total amount appropriated to June 30, 1934---------------                                        177, 544. 55

           Fiscal year ending June 30                 1930          1931             1932           1933             1934


Cost of new work-------                                                          $33, 353. 35
Cost of maintenance-----------------------             $88. 24    $6, 428. 08         558. 17    $2, 987. 80      1$9, 602. 27
                                                                                                                    - -


      Total cost__                                      88. 24     6, 428. 08     33, 911. 52      2, 987. 80        9, 602. 27
Total expended___                                       38. 77     6, 287. 80     34, 575. 27      3, 156. 80        9, 602. 27
Allotted         _
             -----------------------------           9, 000. 00   52, 000. 00 -10,    000. 00    15, 000. 00      -13, 087. 72

  I Increased by $27.06 due to pro rata share of maintaining idle Government plant.

Balance unexpended July 1, 1933___--- _-----____________         $23, 041. 15
Deductions on account of revocation of allotment-----------------13, 087. 72
           Net amount to be accounted                   for____________-                    ____                  , 953. 43
Gross       amount expended_________---------------------------------------9,                                       602. 27
           Balance unexpended June 30, 1934__________________-_____                                                 351. 16

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance '----------------------------------                                                  31, 900. 00

    23. REMOVING THE WATER HYACINTH, MOBILE RIVER, ALA.,
                                                  TRIBUTARIES

   Location.-The water hyacinth is a floating aquatic plant which
infests numerous fresh-water streams tributary to the South At-
lantic and Gulf coasts. It propagates from the seeds and suckers,
spreads quickly in most localities, and may cause entire suspension
of navigation if not removed.
   Exwisting project.-This provides for the extermination or removal
of plants from the navigable waters of the States of Florida, Ala-
bama, Mississippi, Louisiana, and Texas, so far as they are or may
become an obstruction to navigation, by any mechanical, chemical,
or other means whatsoever; for the construction and operation of
boats equipped with suitable machinery for such removal; and for
the construction and operation of log booms to prevent the drifting
of plants from one stream to another. The estimated cost made
in 1899 was $25,000 each for two boats, $10,000 for operation in each
district, and $1,000 for the establishment of booms. The latest
 (1928) approved estimate for annual cost of maintenance is $4,000.
  1 Exclusive of available funds.
  z Increased by $27.06 due to pro rata share of maintaining idle Government plant.
  SIn addition $5,000 was expended for new work and $10,200 for maintenance from
contributed funds.
                  RIVERS AND HARBORS--IMOBILE,                             ALA.         DISTRICT                         589
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1899, made appropriations for the
States of Florida and Louisiana and provided for the extermination
or removal of plants, the building of boats, and the establishment of
booms (H. Doc. No. 91, 55th Cong., 3d sess.); the act of June 13,
1902, authorized the use of any mechanical, chemical, or other means
whatsoever; the act of March 3, 1905, made the appropriation avail-
able for the State of Texas; the acts of March 3, 1905, and March 2,
1907, in making appropriations for Florida, provided that no chemi-
cal process injurious to cattle which may feed upon the water hya-
cinth shall be used; the act of July 25, 1912, made the appropria-
tion available for the State of Mississippi, and also made available
for use in that State the operating plant pertaining to the work in
Louisiana; and the act of July 27, 1916, made the appropriation
available for the State of Alabama.
   Terminal f acilities.-None.
   Operations and results during fiscal year.-Operations, with
United States plant and hired labor now carried on in Dog River
and Three Mile Creek, 303,461 square yards of hyacinths being
sprayed and removed. The total cost was $9,451.59, all for mainte-
nance. The total expenditures were $9,638.20.
   Condition at end of fiscal year.-The project is for maintenance.
The total cost was $43,814.83, and the total expenditures were
$43,122.33.
  Proposed operations.-It is proposed to apply the bilance unex-
pended at the end of the fiscal year, $10,045.93, as follows:
Accounts payable ----------------------------------------                                                           $692. 50
Maintenance:
    Spraying of water hyacinths, and/or removal of water hyacinths
     and other aquatic growths by mechanical methods, in Three
      Mile Creek, Chickasaw Creek, and tributaries, Bayou Sara,
     Dog River, and other minor tributaries of Mobile River .. ___                                                  9, 353. 43

             Tdtal               -------------------------------------------                                    10, 045. 93
  The additional sum of $12,000 can be profitably expended dur-
ing the fiscal year 1936, and will be applied to the operation of two
launches and barges equipped with spraying outfits, on the spraying
and removal of hyacinths in the tributaries of Mobile River from
July 1, 1935, to June 30, 1936.
                                      Cost and financial summary
Cost of maintenance to June 30, 1934_ .. __....                                __           _11___           $43, 814. 83
Minus accounts payable June 30, 1934_6___                           _6-------------                                92. 50

     Net total expenditures -------------------------------                                                     43, 122. 33
Unexpended balance June 30, 1934---------------------------                                                     10, 045.93

         Total amount appropriated to June 30, 1934__---------                                             - 53, 168.26

         Fiscal year ending June 30                1930          1931            1932             1933                1934


Cost of new work---......-- ---------------
Cost of maintenance_                      _---------------------__
                                                              $1, 015.31                .   .   $9,550. 18
                                                                                                $9,550.18---- $9,451. 59
                                                                                                              $9,451. 59
Total expended       --------------------          $284.06        980.05.....                   8,341.79              9,638.20
Allotted ....        ----..   ---------------I-------        I-         ______1_~_~~___1        14,   000. 00
                                                                                                                      9, 268. 26
                                                                           I                I                   I
590           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                   1934

Balance unexpended July 1, 1933 ___----------                                                                    $10, 415. 87
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934 ________________________ $5, 100.00
Amount allotted from War Department Appropriation
   Act approved Feb. 23, 1931__________________________                                  1, 584. 13
Amount allotted from War Department Appropriation
   Act approved Mar. 4, 1933_____________________                                        2, 584. 13
                                                                                                                         9, 268. 26

           Amount to be accounted for ___________________________-                                                  19, 684. 13
Gross amount expended _________________________9,                                                         _                638. 20

      Balance unexpended June 30, 1934 ______________________                                                       10, 045. 93
Outstanding liabilities June 30, 1934-----------------------__                                                          692. 50
           Balance available June 30, 1934__________________________                                                     9, 353. 43

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1___ ______________________________                                                      12, 000. 00

   24. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                        (GENERAL)

  The cost of the work during the year amounted to $98,057.40; the
expenditures were $89,364.52. The balance unexpended June 30,
1934, will be applied to the payment of accounts payable and as
needed during the fiscal year 1935, to payment of expenses to be in-
curred in connection with the above items. The additional sum of
$125,000 can be profitably expended during the fiscal year ending
June 30, 1936.
                                       Cost and financial summnary

Cost of maintenance to June 30, 1934________________ ________--$251, 514. 74
Value of plant, materials, etc., on hand June 30, 1934               128. 94     ------------
      Net total cost to June 30, 1934----------------------------                                                251, 643. 68
Plus accounts receivable June 30, 1934 _.._______  ____----------                                                     949. 98

     Gross total costs to June 30, 1934__-- -------- __- -    252, 593. 66
Minus accounts payable June 30, 1934-------------------------11, 398.24

     Net total expenditures_-------------------------------                                                      241, 195. 42
Unexpended balance June 30, 1934____________________________--                                                    27, 300. 12

           Total amount appropriated to June 30, 1934_______________                                             268, 495. 54

           Fiscal year ending June 30                1930          1931           1932                 1933                 1934

Cost of hewwork---                    -----------------------------------                     ------------------------
Cost :of maintenance------------------ $25, 263. 44 $36, 454. 79               $33, 141. 17      $45, 648. 78             $98, 057. 40
Total expended---      ..-----------------------   25, 365. 79   39, 362. 39    29, 750. 50       45, 943. 70              89, 364. 52
Allotted                        ----- -
               __---_--------------          -     17, 000.00.   35, 000.00     16,800. 00        50, 292. 31              76, 503. 33

  1Exclusive of available funds.
                 RIVERS       AND   HIARBORS-MOBILE,                     ALA.,         DISTRICT                     591

Balance unexpended July 1, 1933__                                      161. 31
                                                                  $_____40,
Amount allotted from War Department Appropriation
Act approved July-14, 1932:_____ __ _____     -
                                             __-__-  $29, 000. 00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933--------------------------48, 998. 40
                                                                   77, 998. 40
          Amount to be accounted for-_____                                                                  118, 159. 71
Deductions on account of revocation of allotment______________                                                1, 495. 07
      Net amount to be accounted.for---------------------------116, 664. 64
Gross amount expended_________________                 94, 287. 98  ______
Less reimbursements collected ------------------------ 4, 923. 46
                                                                   89, 364. 52'
      Balance unexpended June 30, 1934--------------------------                                             27, 300. 12
Outstanding liabilities June 30, 1934____________________________                                            11, 398. 24
     Balance available June 30, 1934_ ... ____.. __.________  -                                              15, 901. 88
Accounts receivable June 30, 1934____________-_________________                                                  949.98
          Unobligated balance available June 30', 1934 _____________-_                                       16, 851. 86
Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1___________________________________   125, 000. 00
                25. Other projects for which no estimates are submitted
                   [Commercial statistics for these projects are given in pt. 2 of report]


                                                       For last     Cost and expenditures to
                                                        full re-          June 30, 1934                      Estimated
                  Name of project                      port see                                              amount re-
                                                       annual                                                 quired to
                                                        report      New work           Maintenance            complete
                                                         for-


1. St. Marks River, Fla.l__                        _     1931          $47, 010. 86     .,        .-         Completed.
2. Entrance to St. Josephs Bay, Fla.-------------_       1931          2 20, 105.99           $1, 402. 88        Do.
3. La Giange Bayou, Fla.3-______
                       4      --- ____________     _     1931            ___                   2,160. 80    $28, 500.
4. Holmes River, Fla. ____________________________       1931           5 6, 401. 25          38, 813. 21   Completed.
5. East Pass Channel from the Gulf of Mexico into        1932      _                           8, 657. 23   (Mtc'e only.)
     Choctawhatchee Bay, Fla.'
6. Coosa River, Ga.' and Ala.' 7..                       1931      2, 574, 911.   97         162, 892. 27    $227,000.
7. Choctawhatchee River, Fla. and Ala.'_...__.....       1933         171,884.    50    8 258, 904. 79       Completed.
8. Flint River, Ga.' o _____       ______ ___            1933         640, 819.   77         182, 577. 77    $89,200.
9. Chattahoochee River, Ga. and Ala.1                    1933      1, 100, 804.   07         943, 588. 64    $75,000.
10. Pascagoula River, Miss. 1                            1933          15, 000.   00         104, 853. 42    (Mtc'e only.)
11. Wolf and Jordan Rivers, Miss.-------                 1933          29, 195.   19          32, 001, 48    Completed.
12. East Pearl River, Miss.' --------------------        1933          37, 127.   93          34, 144. 18         Do.

  1 Channels adequate for commerce.
  2 Exclusive of $20,000 expended from contributed funds.
  3 Awaiting local cooperation.
  4 Commercial boats have withdrawn, and at present no traffic exists.
  5 Exclusive of $2,160.80 which amount was expended for work on La Grange Bayou.
  6 The new pass affords a channel of project dimensions from the Gulf of Mexico into Choctawhatchee Bay,
  7 Abandonment (except operating and care) recommended in 1920.
  8 Expended $50 and $10,112.13 revoked during fiscal year 1934.
  9 Includes plant value $2.48.
to Eliminating improvement above Albany recommended in H. Doec. No. 302, 65th Cong., 1st sess.

     1 Exclusive of available funds.




         91536-ENG 1934-38
592        REPORT OF CHIEF OF ENGINEERS,                             U.   S.   ARMY,       1934

Status of reports called for by river and harbor acts and committee resolutions


        Locality             Authorization act      Transmitted
                                                    to                                          Recommenda-
                                                    to Congress
                                                       Congress           Document no.              tion
                                                                                                    tion

Apalachicola River,        River and Harbor        --------------
  Fla., Inland Water-       Act, Mar. 3, 1925.
  way to New Orleans,
  La., and Apalachicola
  and Chattahoochee
  Rivers to Columbus,
  Ga.
Black Warrior, Warrior,    Rivers and Harbors       June   5, 1934   Rivers and Harbors         Favorable.
  and Tombigbee              Committee resolu-                         Committee No. 45
  Rivers, Ala.              tion, June 7, 1933.                        (73d Cong., 2d sess.).
Chattahoochee River,       River and Harbor
  Ga., and connecting        Act, July 3, 1930.
  waterways.
Chico Bayou, Fla.......    River and Harbor Mar. 14, 1934--.-- _______--...---                 Unfavorable.
                               Act, Sept. 22, 1922.
Choctawhatchee Bay-        Rivers and Harbors May 7,1934 Rivers and Harbors Favorable.
Pensacola Bay,                Committee resolu-                        Committee No. 42
Waterway.                     tion, Nov. 15, 1933.                     (73d Cong., 2d sess.).
Coden Bayou, Ala......     Rivers and Harbors
                               Committee resolu-
                               tion, Feb. 15, 1934.
Dog River, Ala .......- Rivers and Harbors
                                Committee resolu-
                               tion, Aug. 31, 1934.
Flint River, Ga., to River and Harbor Jan. 5,1934 -----------                   ----------- Unfavorable.
  Albany, Ga.                  Act, July 3, 1930.
Flint River, Ga., to ....---- do--------............---- -....
                                                             do.------....
                                                                     ........-----------          Do.
  Montezuma, Ga.
La Grange Bayou, Fla-- Rivers and Harbors
                               Committee resolu-
                               tion, June 13, 1934.
Pearl River, Miss., be-    River      and Harbor
  low Jackson.                 Act, July 3, 1930.
Pensacola   Bay,   Fla., ...---   do-...----. -------
  channel into Bayou
  Chico.
Pensacola Bay, Fla., Rivers and Harbors
  to Mobile Bay, Ala.,          Committee resolu-
  Intracoastal Water-          tion, Apr. 3, 1934.
  way.
Tombigbee and Tennes- Rivers and Harbors
  see Rivers, waterway          Committee resolu-
  connecting.                  tion, Feb. 27, 1934.


   IMPROVEMENT OF RIVERS AND HARBORS IN THE
        FIRST NEW ORLEANS, LA., DISTRICT

  This district embraces the southern part of Louisiana, from Pearl
River on the east to Sabine River on the west, and south of Red
River, including the Passes of the Mississippi River, that portion of
the river between New Orleans and Baton Rouge, La., insofar as the
removal of shoals obstructive to navigation is concerned, and that
portion of the intracoastal waterway, Mobile Bay, Ala., to New
Orleans, La., extending from the Inner Harbor Navigation Canal in
Lake Pontchartrain to Long Point Light in Lake Borgne.
  District engineer: Maj. Henry Hutchings, Jr., Corps of Engineers.
  Division engineer : C'ol. Warren T. Hannum, Corps of Engineers.
         RIVERS AND HARBORS-NEW                 ORLEANS,    LA.,   DISTRICT       593

                                  IMPROVEMENTS

                                     Page.                                        Page.
1. Southwest Pass, Mississippi               17. The Louisiana and Texas
       River, La _   ______           593           Intracoastal Wat e r w a y
2. South Pass Channel, Missis-                     from the Mississippi River
       sippi River, La. (mainte-                    at or near New Orleans,
       nance)                         598           La., to Corpus Christi,
3. Examinations and surveys                        Tex. (New Orleans-Sabine
       at South Pass, Mississippi                                       -
                                                    River section) ___-___-         620
       River, La __- _      ___-      601     18. Operating and care of Har-
4. Mississippi River between                       vey Canals and Lock_____        629
       Baton Rouge and New                    19. Operating and care of Han-
       Orleans, La__... .. ..         602           son Canal, La_________          631
5. Intracoastal waterway, Mo-                201. Operating   and    care   of
       bile Bay, Ala., to New                        Schooner Bayou Lock,
       Orleans, La. (Inner Har-                     La____________-_ __             632
       bor Navigation Canal in                21. Operating and care of Ver-
       Lake    Pontchartrain to                     milion Lock, La__ _-___         634
       Long Point Light in Lake               22. Petit Anse, Tigre, and Carlin
       Borgne section)-               555           Bayous, La____________          635
6. Chefuncte River and Bogue                 23. Bayou Vermilion, La ._____        636
       Falia, La                      604     24. Mermentau     River, Bayou
7. Bayou Bonfouca, La .......        605           Nezpique, and Bayou des
  8. Tangipahoa River, La .____       606           Cannes, La __-_____-            637
  9. Tickfaw, Natalbany, Pon-                 25. Calcasieu River and Pass,
       chatoula, and B 1 ood                                        _
                                                    La------------------            641
       Rivers, La ______-_-           607     26. Lake Charles Deep Water
10. Barataria Bay, La ___...          609          Channel, La ___--_     -   -    643
11. Little Caillou Bayou, La ___      610     27. Removing the water hya-
12. Big Pigeon and Little Pi-                       cinth, Louisiana________       645
       geon Bayous, La___ __ .        611     28. Examinations, surveys, and
13. Bayou Grossetete, La______        613           contingencies (general)         647
14. Bayou Teche, La _-                615     29. Other projects for which no
1.5. Operating and care of Pla-                     estimates are submittect__      648
       quemine Lock, La .___          618
16. Operating and care of Key-
       stone Lock, Bayou Teche,
       La-         ___         ___    619 j

             1. SOUTHWEST PASS, MISSISSIPPI RIVER, LA.

   Location.-Southwest Pass is the westernmost of the mouths of
the Mississippi River. It flows in a generally southwest direction.
 (See U. S. Coast and Geodetic Survey Chart No. 1272.)
   Previous projects.-Authorized by acts of July 4, 1836; March 3,
1837; August 30, 1852; July 8, 1856; March 2, 1867; and March 3,
1873. The cost and expenditures were $1,729,988.53. For scope of
improvements contemplated by above acts see page 1847, Annual
Report for 1915.
   Existing project.-This provides for a channel through Southwest
Pass 1,000 feet wide and 35 feet deep. The general plan of improve-
ment approved in April 1923 provides for contracting the lower 8.3
miles of the Pass to a width of 1,750 feet by means of jetties, spur
dikes, and inner bulkheads; for dredging the channel between the
bulkheads and depositing the dredged material between the bulk-
heads and jetties; for dredging a channel through the outer bar
inclining to the left of the jetty axis; for the construction of small
revetted openings through the narrow portions of the banks of the
Pass for purpose of strengthening these banks; for closure of minor
594     REPORT   OF   CHIEF OF ENGINEERS,   U.   S.   ARMY,   1934


outlets not required for maintenance of the banks; for the construc-
tion of sills to prevent the enlargement of The Jump and Cubits
Gap; for dredging in the river at Head of Passes as far up as Cubits
Gap, a distance of 3.5 miles; for the construction of a sill across the
head of South Pass to limit the flow through that Pass; for repairs
to sill across Pass a l'Outre and bank revetment at Head of Passes;
for construction of dikes with a view to reducing the width of the
river above Head of Passes; for the construction of a submerged
deflecting dike above the Head of Passes; and for other minor work.
The plane of reference is mean low water. Average variation due
to tides at the mouth is 16 inches, at the head 10 inches, affected by
wind or other causes, and extreme tide is 28 inches. The east jetty
is approximately 4.8 miles in length and the west jetty 3.8 miles.
The jetties are composed of a substructure of brush mattresses, origi-
nally built to about the elevation of mean low water, surmounted
with a superstructure of concrete and large riprap. Spur dikes are
composed of cribwork of round piling, filled with willows and stone,
or with a curtain of round piles along the upstream face.
   The estimate of cost for new work, revised in 1928, is $14,500,000,
exclusive of amounts expended on previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $415,000
for a channel width of 500 feet and $680,000 for a width of 1,000 feet.
   The existing project was adopted by the River and Harbor Act of
June 13, 1902, and provides that the details of the work may be
modified at the discretion of the Secretary of War. (See H. Doc.
No. 329, 56th Cong., 1st sess.; Annual Report, 1900, p. 2287, et seq.)
Act of May 28, 1908, authorized dredging in the river at the Head
of Passes as far up as Cubits Gap. The act of March 3, 1909, made
provision for increasing the plant by addition of a large dredge.
For report of the Board of Engineer officers in 1916 see pages 2420-
2426 of Annual Report for 1916. For latest chart see page 2372 of
Annual Report for 1920.
   Termninal facilities.-The Board of Commissioners of the Port of
New Orleans owns and operates the majority of the terminal facilities
of the port of New Orleans.
   The dock board has 3 fruit landings, equipped with 14 banana
unloaders, and other economical devices are included in the com-
modity-handling equipment of the port.
   All public port facilities are served by paved roadways and also
by the Public Belt Railroad, municipally owned and operated, which
connects will all 12 trunk lines entering New Orleans.
   The board has constructed a public cotton-handling terminal, with
a storage capacity of 461,856 high-density bales.
   There is one ship-side grain elevator, with a total storage capacity
of 2,622,000 bushels.
   The board has constructed an inner harbor navigation canal. The
canal connects the Mississippi River with Lake Pontchartrain and
has a depth of 30 feet, referred to mean low Gulf level, and bottom
widths of from 125 to 300 feet.
   The dock board has constructed, on the Inner Harbor Navigation
Canal, a quay wharf of reinforced concrete. The wharf is 265 feet
wide by 2,400 feet long and is served on the front and rear by the
Public Belt Railroad and suitable city streets.
        RIVERS   AND HARBORS-NEW        ORLEANS,   LA., DISTRICT      595
    Among other important port facilities at New Orleans may be
mentioned six floating dry docks, the largest having a capacity of
  16,000 tons, the public coal and bulk commodity handling plant,
  and the Army supply base, comprising three 6-story reinforced con-
  crete buildings, two of which are under lease by the dock board, the
third being utilized as a quartermaster storehouse.
     There are four railroad terminals on the Mississippi River, with
13,850 linear feet of wharves, of which 11,920 linear feet are covered
with sheds, affording 1,858,065 square feet of area.
     Most of port's wharves are covered with transit sheds, affording
 :an area of over 7,500,000 square feet.
     The facilities of the port of New Orleans are considered adequate
for its commerce. (For further details see Post Series No. 5, Corps
of Engineers.)
     Operations and results during ftscal year.-Operations were con-
fined to maintenance. Work by hired labor and United States plant
  consisted of removal of 1,388,218 cubic yards from the bar and lower
jetty channels and 315,328 cubic yards from the entrance channel at
the head of the pass by U. S. hopper dredge Benyaurd at a cost of
'$138,806.82; repairs to East Jetty by placing of 9,500 tons of stone
 .and raising 8,790 linear feet of concrete capping to elevation 5.5 feet,
mean Gulf level, at a cost of $121,925.67; maintenance of spur dikes
at a cost of $20,301.34; maintenance of inner bulkheads at a cost of
:$823.75; maintenance of outlets and spillways at a cost of $7,173.41;
maintenance of banks of the pass-at a cost of $38,928.68; maintenance
of buildings and walks at Burrwood at a cost of $15,455.38; mainte-
=nance of wharves and moorings at a cost of $16,024.90; maintenance
of telephone line at a cost of $191.75; channel surveys, examinations,
and investigations at a cost of $28,522.15; and model tests of proposed
structures for improvement of channel conditions carried out at
Vicksburg hydraulic laboratory at a cost of $24,428. 50. The total
-cost was $412,582.35, all for maintenance, and the total expenditure
was $420,690.74.
    Condition at end of fiscal year.-The project is 93 percent com-
pleted. The jetties were, completed to present length in 1921. East
jetty foundation is 25,400 feet long, and the portion above high water
is about 21,080 feet. The west jetty is 19,960 feet long and has
19,000 feet above high water. Inner bulkheads were completed to
present length in 1923. Their lengths are: East bulkhead, 22,822
feet; west bulkhead, 15,080 feet. During the period 1908 to 1923
mattresses were added to the sill at head of Pass a l'Outre, mattress
sills were placed across Cubit's Gap and The Jump; 11 outlet bayous
in the pass were closed; the mattress sill across Southwest Pass was
removed; 53 spur dikes were constructed in the lower 9 miles of the
pass; and 5 spur dikes and a submerged deflecting dike were built at
Head of Passes. All structures are in good condition, with the
exception of the dikes between the bulkheads and jetties which are
no longer needed, the west jetty which has settled along a portion of
its length and will be raised to grade by addition of concrete cap-
ping, and the jetties and bulkheads which require repair by renewal
of piling which have become unserviceable, all of which work will be
596        REPORT        OF CHIEF OF ENGINEERS,                         U.    S. ARMY,            1934


done during the coming fiscal year.                         Channel conditions on June 30,
1934, were as follows:

                                                                               35-foot channel
                                                            Length of                                            Central
                                                             channel         Minimum       Average               depths
                                                                              width          width


                                                               Miles           Feet              Feet              Feet
Entrance channel into head of the pass-----------------            1. 0            600                  850           37-57
Through pass from head to sea end of jetties---....------           19. 4          800             1, 000                41-79
Through bar channel at mouth of pass_-----------------                 .8          800             1, 000                40-50


   Throughout the length of the pass a 35-foot channel with an aver-
age width of 1,000 feet and a least width generally of not less than
650 feet was maintained during the year. At the Head of Passes
shoaling of a minor nature occurred following the falling of the
river from flood stage. At this time the controlling depth on the
entrance range was reduced to 32 feet over a very small area. It was
promptly restored to project depth by dredging. At no time during
the fiscal year were the 35-foot contours closed. The minimum width
of 35-foot channel in the entrance at the Head of Passes varied from
150 to 750 feet. The flood stage of the river reached 12.30 feet on
the New Orleans (Carrollton) gage on April 15, 1934.
   The work remaining to be done to complete the project consists of
a relatively small amount of dredging and possible additional con-
tracting dikes at Head of Passes and in the lower jetty channel.
   The total expenditures have been $22,600,410.59 and the total cost
$21,876,052.97, of which $13,533,513.33 was for new work and $8,342,-
539.64 for maintenance.
  Proposed operations.--The balance unexpended, including accounts
receivable at the end of the year, a total of $504,643.20, will be
applied as follows:
Accounts payable June 30, 1934 __                     _____-----------____            ______ $20, 143.96
Maintenance (with Government plant and hired labor) :
   Maintenance dredging by U. S. dredge Benyaurd, or substitute,
      in bar and lower jetty channel and entrance channel at Head
      of Passes, about 8 months, as required------------------- 195, 000. 00
   Maintenance of jetties, as required, between July 1, 1934, and
        June 30, 1935__          _-------------_                                                              899, 000. 00
      Maintenance of spur dikes, as required, between July 1, 1934,
       and June 30, 1935_______ ___-_______________                                                           52, 000. 00
      Maintenance of inner bulkheads, as required, between July 1,
       1934, and June 30, 1935__________________________________                                              47, 000.     00
      Maintenance of outlets and spillways, as required, between July
       1, 1934, and June 30, 1935---------------------------------21,                                             000. 00
      Maintenance of banks of pass, as required, between July 1,
       1934, and June 30, 1935________________________________-                                               26, 000.     00
      East Jetty Outer Dike_________________________--__--     -_                                             25, 000.     00
      Examinations and surveys__________________________--__                                                  25, 000.     00
      Model tests, Vicksburg Hydraulic Laboratory_________________                                             4, 499.     24
         Total------------------------------------------                                 -----            504, 643. 20
  The additional sum of $400,000 can be profitably expended for
maintenance during the year 1936, using Government plant and hired
labor, as follows:
             RIVERS AND HARBORS-NEW ORLEANS,                                           LA., DISTRICT                597
Maintenance (with Government plant and hired labor) :
   Maintenance dredging by U. S. dredge Benyaurd, or substitute, in
      the bar and lower jetty channel and entrance channel at Head
      of Passes and other localities, about 8 months, as required, be-
      tween July 1, 1935, and June 30, 1936_-----------             ___-- $210, 000
   Maintenance of jetties, dikes, and bulkheads, as required, between
      July 1, 1935, and June 30, 1936 .....----------------               - 122, 000
   Maintenance of outlets and spillways, as required, between July
      1, 1935, and June 30, 1936-------            ----------------          17, 000
   Maintenance of banks of pass, as required, between July 1, 1935,
           June 30, 1936 ___--------------------------------------
      and and
           June30,-193                                                       27, 000
                                                                             2,0
   Examinations and surveys--------           ------------------------       24, 000
           Total--------             --------------------------------------                                     400, 000

                                        Cost and financial summary
Cost of new work to June 30, 1934   __-------------------                                           $15, 263, 501. 86
Cost of maintenance to June 30, 1934_-.......-----........                                      .     8, 342, 539. 64
      Total cost of permanent work to June 30, 1934                                ---------          23, 606, 041. 50,
Value of plant, materials, etc., on hand June 30, 1934-------                                             697, 385. 42
      Net total cost to June 30, 1934-------------------                                              24, 303, 426. 92
Plus accounts receivable June 30, 1934_-----
                                         ................                                                  47, 116. 16
      Gross total costs to June 30, 1934_---- --------                                          _     24, 350, 543. 08
Mirius accounts payable June 30, 1934 _....______                                                          20, 143. 96
     Net total expenditures__--   ____  ____--_        24, 330, 399. 12
Unexpended balance June 30, 1934 ___________-----------457, 527. 04
           Total amount appropriated to June 30, 1934 ________.__                                     24, 787, 926. 16

   Fiscal year ending June 30                 1930              1931            1932           1933              1934


C ost of new w ork -- - - - - . . - - - - .                 - - - -- . - -- -- . - -- -- . . . . . .
Cost of maintenance ----------- $294, 865. 73                $168, 589. 73 $347, 869. 79 $348, 129. 53 $412, 582. 35
Total expended...                            416, 391. 27
                             ..----------------              245., 540. 07    326, 460. 85   328, 547. 25       420, 690. 74

Allotted   .....---------------------      300, 000. 00      236, 366. 83    -15, 000.00     526, 935. 04       559, 726. 36


Balance unexpended July 1, 1933 ---                __--                                                     $318, 491. 42
Amount allotted from War Department Appropria-
  tion Act approved Apr. 26, 1934-------------- $332, 000. 00
Amount allotted from War Department Appropria-
  tion Act approved July 14, 1932________________ 145, 008. 58
Amount allotted from War Department Appropria-
  tion Act approved Mar. 4, 1933_-----------------     179, 717. 76
                                                                                                             656, 726. 34

     Amount to be accounted for- ---   -------                                                               975, 217. 76
Deductions on account of:
   Revocation of impounded funds---------------                                         35, 403. 91
   Revocation of allotment--------------------                                          61, 596. 07
                                                                                                              96, 990. 98

      Net amount to be accounted for.--------------------                                                    878, 217. 78
Gross amount expended------------------------423, 787. 64
Less receipts from sales -----------------------          3, 096. 90
                                                                                                             420, 690. 74

           Balance unexpended June 30, 1934-_-------                                                         457, 527. 04
598       REPORT     OF   CHIEF OF ENGINEERS,    U.   S.   ARMY,   1934

Outstanding liabilities June 30, 1934-------------------------        $32, 087. 87
      Balance available June 30, 1934-----------------------425, 439. 17
Accounts receivable June 30, 1934---------------------------- 47, 116. 16
         Unobligated balance available June 30, 1934-------------472, 555. 33
-Amount  (estimated) required to be appropriated for completion
  of existing project 1----------------------------------           1,000, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1936, for maintenance 1----------------                     400, 000. 00
-2.SOUTH PASS CHANNEL, MISSISSIPPI RIVER, LA. (MAINTENANCE)

   Location.-The entrance is 107.5 miles from New Orleans, La.; 141
miles from Mobile, Ala., on the east; and 349 miles from Galveston,
.Tex., on the west. (See U. S. Coast and Geodetic Survey Chart No.
1272.)
    Existing project.-The existing project authorized James B. Eads
and associates to construct such permanent and sufficient jetties and
auxiliary works as are necessary to secure and maintain for a period
of 20 years through the Pass a channel 26 feet in depth and not less
than 200 feet wide at the bottom and having through it a central
-depth of 30 feet, without regard to width, at the termination of the
maintenance period the channel to be maintained by the United
States; construction and maintenance of sill and submerged deflect-
ing dikes across head of South Pass and maintenance of sill across
Pass a l'Outre, removal of west dike, and construction of submerged
and spur dikes at Head of Passes; for dredging a channel 35 feet
deep, no width specified, through the shoals in the river between
Cubits Gap and Head of Passes, 31/2 miles; and for a seaward exten-
sion of the west jetty at mouth of Pass. The plane of reference is
mean low water. Variation of water surface is 16 inches at the
mouth and 10 inches at the head, due to tide. The extreme range of
tide at the mouth is 28 inches. Each jetty foundation is 12,070 feet
long. Inner east jetty is 11,170 feet long. The west jetty is 7,820
feet long. Inner west jetty is 790 feet long. The jetties are com-
posed of a substructure of brush mattresses surmounted by a super-
structure of concrete. Auxiliary works are spur dikes and inner
jetties, which are composed of a cribwork of round piling filled with
willows and stone. The amount paid James B. Eads and associates
was $8,000,000, being the total cost of new work. The latest (1928)
approved estimate for annual cost of maintenance is $150,000.
    The existing project was adopted by the River and Harbor Act of
March 3, 1875, amended by acts of June 19, 1378 and March 3, 1879.
The Emergency Act of June 6, 1900, provided for the maintenance
by the United States and appropriated a sum not exceeding $100,000
annually for this work. The River and Harbor Act of May 28, 1908,
  authorized dredging in the river. The removal of west dike and
  construction of spur dikes and bank revetment at Head of Passes
  were based on the additional works planned in 1916 by the Board of
  Engineer officers appointed by the Secretary of War for Southwest
Pass (Annual Report for 1916, pp. 2420-2426). For latest published
map see page 2656 of Annual Report for 1919.
   ' Exclusive of available funds.
         RIVERS    AND HARBORS-NEW             ORLEANS,    LA.,   DISTRICT        599
   Terminal facilities.-For description of the public docks, ware-
houses, wharf sheds, industrial canal, and quartermaster storehouses
at New Orleans, La., see report for Southwest Pass, Mississippi River.
   Operations and results during,fiscal year.-Operations during the
fiscal year were confined to maintenance. Work by hired labor and
United States plant consisted of maintenance of jetty channel struc-
tures and east jetty longitudinal dike at a cost of $29,084.22; main-
tenance of outlets and spillways at a cost of $10,966.43; maintenance
of dikes, sills, and other structures at Head of Passes at a cost of
$27,002.12; maintenance of wharves, moorings, buildings, and walks
at Port Eads and Head of Passes at a cost of $12,536.85; and miscel-
laneous examination of bar channel at a cost of $62.15.
   The total cost was $79,651.77 and the total expenditure $18,398.95.
   Condition at end of fiscal year.-Improvement begun by James B.
Eads in 1875 comprised east and west jetties at the mouth, with
lengths of 12,070 and 7,820 feet, respectively; 36 spur dikes between
the jetties; two mattress sills and various dikes at Head of Passes;
and dredging the channel. These works were completed on July 8,
1879, when the 20-year period of maintenance by contract began.
Two side outlets were closed, and spur dikes were built at two locali-
ties in South Pass. Inner east and west jetties with lengths of 11,170
and 4,710 feet, respectively, were completed in 1886. The Eads con-
tract ended January 28, 1901.
   Since the latter date the pass has been maintained by the United
States. The work done includes a shoreward extension of 872 linear
feet to inner east jetty; maintenance placing of a mattress sill across
the head of South Pass, and an upstream extension, 1,300 feet long,
of the headland dike between South and Southwest Passes; sinking of
224,742 square yards of mattresses for bank protection purposes at
the Head of Passes; construction of spur dikes along the left bank
above Head of Passes; .and placing a submerged deflecting dike
across head of Pass a l'Outre. Throughout the year a channel of
project dimensions was maintained without addition or extensive
repair to existing works. On June 30, 1934, controlling channel con-
ditions obtained in the entrance channel of the Head of Passes, where
there was a channel 30 feet deep with a minimum width of 500 feet.
   The total cost was $14,177,718.80, of which $8,765,000 was for new
work and $5,412,718.80 for maintenance. The total expenditures
have been $14,211,241.26.
   Proposed operations.-Thebalance unexpended, including accounts
receivable, at the end of the fiscal year, together with the permanent
annual appropriation of $94,960, available July 1, 1934, a total of
$139,801.01, will be applied as follows:
Accounts payable June 30, 1934--------------------------------     $13,202. 43
Maintenance (with Government plant and hired labor) :
    Maintenance dredging by U. S. dredge Benyaurd, or substitute,
      in the entrance channel from the Gulf and at the entrance
      channel at Head of Passes, about 1 month, at $22,500 per
      month, as required between July 1, 1934, and June 30, 1935__ 22, 500. 00
    Maintenance of jetties, dikes, bulkheads, and spillways below
      Head of Passes, as required between July 1, 1934, and June
      30, 1935                                                        , 000.00
                                                                    67---------------------------
    Maintenance of dikes, sills, and structures at Head of Passes
      as required between July 1, 1934, and June 30, 1935---------  37, 098. 58

         Total                                                             139, 801. 01
                                                                       .-------
t600            EPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                    1934

  Necessary maintenance operations during the fiscal year 1936 will
be carried out under allotments from appropriations made available
for such purposes.
                                    Cost and financial summary
,Cost of new work to June 30, 1934---                   __-------____                    ___-- __           $8, 765, 000. 00
Cost of maintenance to June 30, 1934-__--__-                            ---          ___---                  5, 412, 718. 80
      Total cost of permanent work to June 30, 1934---------                                                 14, 177, 718. 80
Value of plant, materials, etc., on hand June 30, 1934                                ----------                  42, 495. 00
      Net total cost to June 30, 1934- ---.---------      _ 14, 220, 213. 80
Plus accounts receivable June 30, 1934_---------------__-       - 4,229. 89

      Gross total costs to June 30, 1934----_......----                                -----                 14, 224,443. 69
-Minus accounts payable June 30, 1934 ----.--.---- __                                     .------                 13, 202. 43

      Net total expenditures-_-- -------------                                                 - --          14, 211,241. 26
iUnexpended balance June 30, 1934_----         ---                             --            ------           -40, 611. 12

            Total amount appropriated to June 30, 1934_-.......                                     __       14, 251, 852. 38

            Fiscal year ending June 30              1930           1931                1932                1933          1934


Cost ofnew work__
Cost of maintenance........-----------------$131, 847.42 $99, 356. 93               $90, 903. 73 $120, 908. 93         $79, 651. 77
Total expended      -----------------------      76, 756. 95     75, 346. 93         69, 867. 17     138, 587. 34       18, 398. 95
Allotted_                                               00.00 100, 000. 00
                                           __----------------------------95,         80, 000. 00         90,143.67      46,425. 41


:Balance unexpended July 1, 1933___   _-------------------            $12, 584. 66
-Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933------------------              $6,000. 00
Amount allotted from River and Harbor Act June 6,
  1900, for fiscal year 1934------------------------ 89, 500. 00
                                                                       95, 500. 00

-Amount to be accounted for_--------___-----__---------                                                           108, 084. 66
Deductions on account of:
   Revocation of impounded funds ----                                                            468. 31
                                                                                          _--------
   Revocation of allotment __-----------------                                              48, 606. 28
                                                                                                                     49, 074. 59

       Net amount to be accounted for-.....___-------                                                                59,010. 07
'Gross amount expended-----------------------         52, 389. 70
-Lessreceipts from sales -- ____-------------      -_ 33, 990. 75
                                                                                                                     18, 398. 95

      Balance unexpended June 30, 1934-- _______------------      40, 611. 12
Outstanding liabilities June 30, 1934__--    ________-----------14, 070. 08

      Balance available June 30, 1934_.....___________-----                                                          26, 541. 04
Accounts receivable June 30, 1934_------______--    -----------                                                       4,229. 89

            Unobligated balance available June 30, 1934___                              --         ---               30, 770. 93

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1-------------------------------       100, 000. 00

   IExclusive of available        funds.
            RIVERS AND          HARBORS-NEW                  ORLEANS,               LA.,      DISTRICT            601
3. EXAMINATIONS                AND       SURVEYS            AT         SOUTH          PASS,        MISSISSIPPI
                                              RIVER, LA.

   Existing project.-The existing project provides for making ex-
aminations and surveys of the outer channel in the Gulf of Mexico,
throughout the pass, and at the Head of Passes, and dredging shoals
in river between Cubits Gap and Head of Passes, where necessary to
:secure a depth of 35 feet with practical width. The latest estimate
for the work (maintenance) made in 1928 is $10,000 per annum.
The project was adopted by the act of March 3, 1875. The act of
August 11, 1888, appropriated a sum not exceeding $10,000 an-
:nually for this work. The act of June 13, 1902, authorized a con-
tinuation of making examinations, notwithstanding the termination
of the contract with the late James B. Eads, and the act of May 28,
1908, added the dredging of shoals in the river. For the latest
charts of South Pass and Head of Passes see page 2656 of the
Annual Report for 1919.
   Terminal facilities.-See report for Southwest Pass.
   Operations and results during fiscal year.-Operations during
the fiscal year, all by United States plant and hired labor, consisted
,of making frequent examinations and surveys in the entrance chan-
nels at the head and mouth of the pass, and miscellaneous survey
work in connection with navigation, construction work in progress,
:and investigations and studies under way.
   Continuous water-level records were obtained at each end of the
pass and at Pilottown above the Head of Passes.
                   Percentage of total flow through the 3 main passes

                                          1927     1928      1929        1930       19311      1932      1933     19341


Southwest Pass_____ ___ _           _      39. 7    39. 0      39. 0     40. 6       37. 95    40. 64    40. 25    40. 73
South Pass _________________________       17. 6    18. 4      17. 5     17. 6'      16. 90    17. 00    17. 27    17. 16
Pass a l'Outre _____-. ___     ______      42. 7    42. 6      43. 5     41.8        45. 15    42. 36    42. 48    42. 11

      Total----------------------100.         0    100. 0    100. 0      100.0      100. 00   100. 00   100. 00   100. 00

  1 Due to the low river stages that existed during the 1931 and 1934 floods, these observations were probably
influenced by wind and tide to a greater extent than during other years.

   The total cost was $4,009.34, and the total expenditure was
$4,146.32.
   Condition at end of fiscal year.-There has been expended a total
of $591,509.08 for examinations and surveys, the cost of this work
being $591,939.98, all for maintenance.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, together with the permanent annual appropriation of
$9,200, available July 1, 1934, a total of $9,630.90, will be applied
as follows:
Accounts payable June 30, 1934-----------------------------------$430. 90
Examinations and surveys at the rate of $766.66 per month during
  the fiscal year---9,2--------------------------------------9,200. 00
         Total                   -----                 --------------------------                            9, 630. 90
   Operations during the fiscal year 1936 will be carried out with
allotments from appropriations made available for such purposes.
602          REPORT OF CHIEF OF ENGINEERS,                                                U.       S.   ARMY,           1934

                                         Cost and financial summary
Cost of maintenance to June 30, 1934 ___________________--
                                                .__                                                                      $591, 939. 98
Minus accounts payable June 30, 1934_________- ___-___--                                                           ___430.90

     Net total expenditures-----------------------------------                                                                 591, 509. 08
Unexpended balance June 30, 1934                                                                                                 4, 721. 56
         Total amount appropriated to June 30, 1934______________                                                              596, 230. 64

         Fiscal year ending June 30                            1930              1931                1932             1933             1934


Cost of new work___--------------------------------
Cost of maintenance-------------___                         $10, 000. 00     $10, 000. 00         $10, 000. 00      $9, 924. 12       $4, 009. 34

Total expended                           __
                        -___-___ -________                    9, 829. 69      10, 441. 86           9, 662. 40      10, 311. 63        4, 146. 32

Allotted------------__________                --             10, 000. 00      10, 000. 00          10, 000. 00       9, 924. 12        8, 300. 00


Balance unexpended July 1, 1933 ___- __________--__--________-                                                                       $567. 88
Amount allotted from River and Harbor Act approved June 13, 1902,
  1902, for fiscal year 1934---------------------------    -----                                                                    8, 300. 00

      Amount to be accounted for_-_________                                                                                         8, 8617. 88
Gross amount expended_-______--___         _____                                             ____                                   4, 146. 32
      Balance unexpended June 30, 1934-___________-__                                                                               4, 721. 56
Outstanding liabilities June 30, 1934 -----------
                                                __---- ____-__-__-                                                                     430. 90
          Balance available June 30, 1934_--                                  -__-______---_______                                  4, 290. 66
Amount that can be profitably expended in fiscal year ending June 30,
1936, for maintenance 1----------------
                          ____-____--____--___                        10, 000. 00
      4. MISSISSIPPI RIVER, BETWEEN BATON ROUGE AND NEW
                            ORLEANS, LA.
  Location.-The Mississippi River between Baton Rouge and New
Orleans flows in a general southeasterly direction through the south-
eastern portion of the State of Louisiana. Other data are as follows:
                                                                                                  Maximum          Minimum           Average


Width                                              ..------------------------------------------
                                                                              __--.feet__               4, 700           1, 500            2, 900
Discharge -.     . . . . ..                        .    .       ..----------------------------------
                                                                         second-feet__ 1, 358, 000                    135, 000 --        ---
Fall of water surface -------------------..
                                        _                      feet (approximate)__                27. 0                   0. 5
Mean velocity ...       ..........
                                ....   ..     feet per second (approximate)__                               9. 0             0. 5


   Previos projects.-The improvement of this section of the river
under supervision of the Mississippi River Commission, was author-
ized by the River and Harbor Act of June 3, 1896.
   Existing project.-This provides for a channel 35 feet deep at low
water and 300 feet wide between Baton Rouge and New Orleans,
La., a distance of 132 miles, at an estimated annual cost of $14,000
during years in which high floods occur.
   The existing project was adopted by the River and Harbor Act
approved January 21, 1927 (H. Doc. No. 105, 69th Cong., 1st sess.).
   Terminal facilities.-The city of Baton Rouge has recently in-
stalled a modern terminal, including a reinforced concrete wharf
504 feet long. Attached to the main wharf is a large floating dock,
to and from which freight is transferred by means of escalators. A
triple-track car barge, 300 feet long, with capacity for 16 cars, serves
   1Exclusive of available funds.
              RIVERS AND HARBORS-NEW                                  ORLEANS,          LA., DISTRICT                   603
for interchange of all freight destined to either east or west bank.
The facilities are served by a municipal terminal with a maximum
handling capacity of 40 cars per day.
   The facilities of the port of Baton Rouge are considered adequate
for its commerce.
   Opierations and results during fiscal year.-Operations during the
fiscal year were confined to maintenance, all by Government plant
and hired labor; 341,335 cubic yards were removed from the chan-
nel at Red Eye Crossing, near Brusly, La., 4 miles below Baton
Rouge, La., by the U. S. hopper dredge Benyaurd. The total cost
and expenditure was $16,086.61, all for maintenance.
   Condition at end of flscal year.-A channel of project depth and
width was uniformly available throughout the year. The dredging
operations performed at Red Eye Crossing provided for full project
depth and width at extreme low-water stage during the fiscal year.
The total costs and expenditures have been $91,717.68, all for
maintenance.
   Proposed operations.- The balance unexpended, $17,000, at the
end of the fiscal year, will be applied to maintenance dredging by
U. S. dredge Beny'aurd when shoaling may occur between July 1,
1934, and June 30, 1935.
   The additional sum of $20,000 can be profitably expended during
the fiscal year 1936, to be applied to maintenance dredging by U. S.
dredge Benyaurd, or substitute, when shoaling may occur.
                                        Cost and financial summary
Cost of maintenance to June 30, 1934---                                ----------- ----------               $91, 717. 68
Net total expenditures------------------------------------   91, 717. 68
Unexpended balance June 30, 1934 --------------------------- 17, 000. 00
           Total amount appropriated to June 30, 1934                                                              717. 68
                                                                                                             1--------------08,

           Fiscal year ending June 30                     1930          1931           1932          1933             1934


Cost of new work .
Cost of maintenance-----
                                --------
                                                        24, 938. 70 $4, 580. 32
                                                       $-------------
                                                                                    ----------------------
                                                                                    $12,931.69     $7, 287. 41
                                                                                                                  -----------
                                                                                                                    $16, 086. 61

Total expended---------      -------.     -----         24, 927. 56    4, 542. 72     1, 396. 18   18, 871. 66       16, 086. 61

Allotted    ..-----------        ...----------------   39, 000. 00    20, 000. 00 -23, 000. 00     19, 994. 85       10, 722. 83


Balance unexpended July 1, 1933---------------------------- $22, 363. 78
Amount allotted from War Department Appropriation Act approved
  Apr. 26, 1934------------------------------------------      17, 000. 00

      Amount to be accounted for---------------------------                                                      39, 363. 78
Deductions on account of :
   Revocation of impounded funds --------------------    $6. 30
    Revocation of allotment------------------------ 6, 270.87
                                                                                                                  6, 277. 17

      Net amount to be accounted for------------------------   33, 086. 61
Gross amount expended -     ----------------------------------- 6, 086. 61
           Balance unexpended June 30, 1934--------------------                                                  17, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1--------              -                                                              20, 000. 00
   1 Exclusive of available funds.
604    REPORT   OF   CHIEF OF   ENGINEERS,   U. S.   ARMY,   1934


5. INTRACOASTAL WATERWAY, MOBILE BAY, ALA., TO NEW ORLEANS,
   LA. (INNER HARBOR NAVIGATION CANAL IN LAKE PONTCHAR-
TRAIN TO LONG POINT LIGHT IN LAKE BORGNE SECTION)

  For report on this improvement see page 555.
           6. CHEFUNCTE RIVER AND BOGUE FALIA, LA.

   Location.-The Chefuncte River rises in the upper portions of
Tangipahoa and Washington Parishes, La., and flows southerly into
Lake Ponchartrain, opposite New Orleans. (See U. S. Coast and
Geodetic Survey Chart No. 1269.)
   Previous projects.-Authorized by the River and Harbor Act of
1872. The cost and expenditures were $5,221 for new work. For
further details of previous projects see page 731, Annual Report for
1913.
   Existing project.-This provides for a channel 8 feet deep at mean
Gulf level from that depth in Lake Ponchartrain via Chefuncte
River and Bogue Falia to Washington Street, Covington, La. The
total length of improvement is 14 miles. Under ordinary conditions
the mean range of tide at the mouth is about 10 inches, and near
Covington about 3 inches, and the extreme range about 14 inches and
5 inches, respectively. The variation of water surface in the upper
Chefuncte River and Bogue Falia, due to floods, is about 8 feet; that
in the lower Chefuncte River at Lake Pontchartrain, due to winds,
is about 3 feet. The estimate of cost for new work, revised in 1927,
was $8,460, exclusive of amounts expended on previous projects.
The latest (1928) approved estimate for annual cost of maintenance
is $2,000.
   The existing project was adopted by the River and Harbor Act of
March 3, 1881, which provided for dredging and removal of obstruc-
tions (H. Ex. Doc. No. 54, 46th Cong., 2d sess.), and the act of July
3, 1930, provided for the present dimensions of the channel (Rivers
and IHarbors Committee Doc. No. 2, 70th Cong., 1st sess.). The
latest published map is printed opposite page 2437 of the Annual
Report for 1916.
   Terrminal facilities.-Terminals are located at Madisonville and
Houltonville. There is no terminal at Covington. The banks in
the upper courses are generally firm and high and landings are made
directly on the banks in some of these places. Except at Covington,
the terminals are adequate for the existing commerce.
   Operations and!results during fiscal ye'ar.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1929. The obstructions in Chefuncte River and Bogue
Falia were originally removed in 1886 and the channel through the
bar was originally dredged in 1903. The controlling depths on June
30, 1934, were 10 feet over the bar at the mouth of the Chefuncte
River, 8 feet in the river and in Bogue Falia to mile 13, and 61/2
feet from mile 13, to Washington Street, Covington, La., available
throughout the year. Except for the bar at the mouth of Bogue
Falia, the channel is in good condition.
   The total costs and expenditures have been $55,658.77, of which
 $19,342.24 was for new work and $36,316.53 for maintenance.
             RIVERS AND HARBORS-NEW                         ORLEANS, LA., DISTRICT               605
  Proposed operations.-The unexpended balance, $5,000, will be
applied to operation of one United States 15-inch hydraulic dredge
during the period May 15, to May 31, 1935, in maintenance dredging.
  This work will provide a channel which will be adequate for exist-
ing commerce, and no additional funds can be profitably expended
during the fiscal year 1936.
                                    Cost and financial summary

Cost of new work to June 30, 1934___                           $24, 563. 24
Cost of maintenance to June 30, 1934-------------------------- 36, 316. 53
           Total cost of permanent work to June 30, 1934-----------60, 879. 77

Net total expenditures_-----------------                       -----------            60, 879. 77
Unexpended balance June 30, 1934_                                                 .... 5, 000. 00

           Total amount appropriated to June 30, 1934--------------                      65, 879. 77

           Fiscal year ending June 30            1930        1931       1932      1933          1934


Cost of new work ..                         -                                              --    --
Cost of maintenance---------------------         $5, 000-
Total expended__--------------------------        5, 000
Allotted            -     ---   --------------      ------------    -      -$5,                        000


Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934    ---------------------------------------------                  $5, 000,
Balance unexpended June 30, 1934--                  ---------------------------- 5, 000-

                                   7. BAYOU BONFOUCA, LA.

   Location.-This stream rises about 5 miles north of Slidell, La.,
and empties into Lake Pontchartrain 5 miles west-southwest of that
town. (See U. S. Coast and Geodetic Survey Chart No. 1268.)
   Existing  project.-This provides for dredging a channel 10 feet
deep at mean low water and 60 feet wide on the bottom from Slidell
to deep water in Lake Pontchartrain, a distance of about 73/4 miles..
The average range of water level, due to tide, is 0.8 foot. The esti-
mate of cost for new work was $22,000, of which $5,500 was con-
tributed by local interests, and $1,200 annually for maintenance..
These estimates were made in 1924.
   The existing project was adopted by the river and harbor act
approved January 21, 1927 (H. Doc. No. 474, 68th Cong. 2d sess.)..
The latest published map is in the project document.
   Local cooperation.-Fully complied with.
   Terminal faoilities.-All terminal facilities are at Slidell and con-
sist of three loading slips and three wharves, with tram-track con-
nections and skids for loading timber. There are also marine ways
and a graving dock. All terminal facilities are privately owned.
They are adequate for present commerce and may be enlarged and
modernized at moderate cost when required.
   Operations and results d;ring fiscal year.-None.
   Condition at end of fiscal year.-The project was completed in
1931. A 10- by 60-foot channel extends across the bar at the mouth
of the bayou, and project dimensions have been obtained from the,
606           REPORT OF              CHIEF OF ENGINEERS,                       U.   S.    ARMY,     1934


mouth to the spur track of the New Orleans & Northeastern Railway,
at mile 73/4, the upper end of the improvement.
  The controlling depths on June 30, 1934, were 10 feet from the
10-foot contour in Lake Pontchartrain to the mouth of the bayou,
and 11 feet from the mouth to the head of the improvement. The
channel through the bar and in the bayou is in good condition.
   The total costs and expenditures under the existing project to the
end of the fiscal year were $36,497.27, of which $30,997.27 were United
States funds and $5,500 contributed funds, all for new work.
   Proposed operations.-No funds are available and no operations
contemplated during the fiscal year 1935.
   The sum of $6,000 can be profitably expended during the fiscal year
1936, to be applied to maintenance operation of one United States
15-inch hydraulic dredge 20 -days during July 1935. This project
was completed in 1931, and previous experience indicates that the
channel through the bar at the mouth of this bayou shoals to such
an extent as to require maintenance dredging every 3 or 4 years.
                                              Cost and financial summary
Cost of new work to June 30, 1934 1____________________________                                           $30, 997. 27
Cost of maintenance to June 30, 1934_
          Total cost of permanent work to June   30, 1934-------------__
                                            -- - -- - -- - -- - -- - -
                                                                                                            30, 997. 27
          Net total expenditures 1_____________                          __                                 30, 997. 27
          Total amount appropriated to June 30, 1934 ______________.                                        30, 997. 27

          Fiscal year ending June 30                       1930        1931           1932        1933             1934

Cost of new work___
                 -------       __---------- $12, 732. 41     $2, 620. 59 $15, 644. 27
Cost of maintenance------------------        ----------------------------                          -------------

Total expended     -----------------------              9, 302. 05    5, 888. 13    15, 807. 09                - ---
Allotted---       .-----.------------------         -----------      10, 000. 00     4, 497. 27


Amount that can be profitably expended in fiscal year ending June 30,
1936, for maintenance--                      ---------------------   $6, 000
                                               8. TANGIPAHOA RIVER, LA.

   Location.-This river has its origin in the State of Mississippi and
flows in a generally southerly direction about 110 miles to Lake
Pontchartrain, La. (See U. S. Coast and Geodetic Survey Chart
No. 1269.)
   Existing project.--This provides for improvement, without dredg-
ing, by removing overhanging trees, snags, and obstructions for a
distance of 531/2 miles above the mouth. The variation of the water
surface, due to freshets, is from 3 to 20 feet in the upper reaches,
from 2 to 5 feet in the lower reaches, and from 2 to 4 feet in the lower
reaches due to tides and winds.
   The estimated cost of new work, made in 1878, was $10,700. There
is no approved estimate of cost for annual maintenance.
   The existing project was authorized by the River and Harbor Act
of June 10, 1872 (H. Ex. Doc. No. 54, 46th Cong., 2d sess.), and modi-
fied by the act of June 14, 1880. The latest published map is in
House Document No. 257, Sixty-sixth Congress, first session.
   1 In   addition $5,500 was expended from contributed funds.
            RIVERS AND HARBORS-NEW                               ORLEANS,         LA., DISTRICT                      607

  Recommended modifications of project.-The project has been
recommended for abandonment (H. Doc. No. 467, 69th Cong., 1st
sess.).
   Terminal facilities.-Nbne.
   Operations and results during fscal year.-None.
   Condition at end of fiscal year.-The project was completed in
1884. The controlling depths on June 30, 1934, were as follows:
Over bar at mouth, 3.5 feet; mile 0 to mile 8.8, 7 feet; mile 8.8 to
mile 14.8, 2 feet; and unnavigable above this point, All depths are
referred to mean Gulf level. Except for the bar at the mouth of the
river, the channel is in good condition to mile 8.8 and fair to mile
14.8.
   The total costs and expenditures were $13,858.14, of which $11,500
was for new work and $2,358.14 for maintenance.
   Proposed operations.--The unexpended balance, $5,000, will be
applied to maintenance operation of one United States 15-inch
hydraulic dredge during the period June 1 to June 15, 1935. This
work will provide a channel which will be adequate for existing com-
merce, and no additional funds can be profitably expended during
the fiscal year 1936.
                                         Cost and financial summary

Cost of new work to June 30, 1934---------------------------- $11, 500. 00
Cost of maintenance to June 30, 1934------------------------- 2, 358. 14
          Total cost of permanent work to June 30, 1934----- --------                                           13,858. 14
      Net total expenditures-------------------------------13, 858. 14
Unexpended balance June 30, 1934------------------------------ 5, 000. 00
          Total amount appropriated to June 30, 1934--------------18, 858.14

          Fiscal year ending June 30                  1930         1931          1932               1933           1934


Cost of new work---------        ------------     ------------------------------------      ------------------
Cost of maintenance-----------------              -----------    $2, 314. 60     $43. 54       ..

Total expended...------....------------------------------         2, 311. 35       39. 47            . $7. 32

Allotted ------.---     --------------      ---   ------------    3, 500. 00             -- 1,141.86
                                                                               ....-------....--                     $5, 000


Amount allotted from War Department Appropriation Act approved
  Apr. 26, 1934-----------------------------     ----     ------------ $5, 000
Balance unexpended June 30, 1934 --------------------------             5, 000

9. TICKFAW, NATALBANY, PONCHATOULA, AND BLOOD RIVERS, LA.

  Location.-Natalbany and Blood Rivers are tributaries of Tick-
faw River; Ponchatoula River is a tributary of Natalbany River.
(See U. S. Coast and Geodetic Survey Chart No. 1269.)
  Tickfaw River rises in the extreme southwestern part of the State
of Mississippi and flows in a southerly direction to Lake Maurepas,
a distance of about 105 miles.
  Natalbany River flows in a generally southerly direction, and dis-
charges into Tickfaw River about 2 miles above its mouth.
          91536-ENO 1934-39 ..
608     REPORT    OF CHIEF    OF ENGINEERS,      U.   S.   ARMY,    1934

   Ponchatoula River flows in a southerly and southwesterly direc-
tion, and discharges into Natalbany River about 33/4 miles above its
mouth.
   Blood River is a small stream, flowing in a southeasterly direc-
tion and discharging into Tickfaw River about 71/2 miles above its
mouth.
   Existing project.-This provides for the removal of obstructions
in the Tickfaw River from its mouth to a point 26 miles above,
on the Blood River from its mouth to the head of navigation, about
4 miles; and on the Natalbany and Ponchatoula Rivers for a distance
of 15    miles, the total length of improvements being 451/ miles.
Under ordinary conditions the mean range of tide is about 10 inches
at the mouth of the Tickfaw River and about 3 inches at the head
of navigation on each stream. The extreme variation of water sur-
face due to freshets is about 9 feet in the upper reaches of all streams
and about 30 inches at the mouth of the Tickfaw River. The esti-
mate for new work made in 1881 was $10,230. There is no approved
estimate of cost for annual maintenance.
   The existing project was adopted by the River and Harbor Act of
March 3, 1881 (H. Ex. Doc. No. 54, 46th Cong., 2d sess., and An-
nual Report for 1880, p. 1182). The latest published map is printed
opposite page 2439 of the Annual Report for 1916.
   Terminal facilities.-There are a number of small private wharves
on each of these streams, and all unloading is done by hand. The
terminal facilities are considered adequate for the existing
commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1921. The controlling depths, mean low Gulf on June 30,
1934, and available throughout the year were as follows: Tickfaw
River, 6 feet on bar at entrance, 1.6.5 feet to mile 10, 10 feet to mile 17,
and not navigable above mile 17; Natalbany River, 8.5 feet to mile 10;
Ponchatoula River, 12 feet to mile 4; Blood River, 7 feet to mile 4.
Mile 0 is at mouth of stream in each case. Except for the bar at the
entrance from Lake Maurepas, the streams are in good condition.
Head of navigation for boat traffic on Tickfaw River is at mile 17,
on Natalbany River at mile 10, and on Ponchatoula and Blood Rivers
at mile 4.
   The total costs and expenditures were $27,928.77, of which $8,115.49
was for new work and $19,813.28 for maintenance.
   Proposed operations.--The unexpended balance, $5,000, will be
applied to maintenance operation of one United States 15-inch
hydraulic dredge during the period June 16 to June 30, 1935. This
work will provide channels which will be adequate for existing
commerce, and no additional funds can be profitably expended dur-
ing the fiscal year 1936.
                         Cost and finanoial summary
                                             _------____
Cost of new work to June 30, 1934_ __----____-                           $8, 115. 49
Cost of maintenance to June 30, 1934_____ ______
                                               --          ___     ___   19, 813. 28
      Total cost of permanent work to June 30, 1934------------          27, 928. 77
                             ------------
     Net total expenditures___                                           27, 928. 77
Unexpended balance June 30, 1934--------.-----              -             5, 000. 00
      Total amount appropriated to June 30, 1934-......                  32, 928. 77
          RIVERS      AND HARBORS-NEW                      ORLEANS,     LA., DISTRICT              609

       Fiscal year ending June 30                   1930    1931        1932        1933         1934


Cost of new work....------------ -----    ------------      --------------------------------
Cost of maintenance_--------------- ----------    $2, 825. 82       $7. 35 -------------------
Total expended      .----------------------------          2, 820. 95     11. 15      $1. 07 -----------

Allotted- -----..... .      ..--
                            ..---     --      .-------
                                                   _       3, 000. 00 -----------
                                                                           ....     -166. 83       $5, 000


Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934 -------------------------------------------          $5, 000
Balance unexpended June 30, 1934 ____________-._______     ___------- 5, 000

                                    10. BARATARIA BAY, LA.

   Location.-This waterway is in Jefferson Parish, La., and extends
about 37 miles in a generally southerly direction from the junction
of Bayou Villars and Big Barataria Bayou, through Big Barataria
Bayou, Bayou Dupont, a canal (Dupre Cut) through the marsh,
Bayou Cutler, Bayou St. Denis, and Barataria Bay to the east end
of Bayou Rigault, at Grand Isle, and connects with the Gulf of
Mexico through Grand Pass. (See U. S. Coast and Geodetic Survey
Chart No. 196.)
   Existing project.-This provides for dredging a channel 5 feet
deep at mean low Gulf level and 50 feet wide on the bottom from
the junction of Bayou Villars and Big Barataria Bayou to Grand
Isle, a distance of about 37 miles. The Secretary of War is author-
ized, in his discretion, to change the location of the route and in-
crease the dimensions of the channel if the estimated cost of the
improvement to the United States is not increased thereby. Under
ordinary conditions the mean range of tide is 12 inches at the mouth
and zero at the head, and the extreme range 24 inches and 12 inches,
respectively. The variation of water surface near the mouth, due
to hurricanes, has been as high as 6 feet. The estimated cost of
new work, for a canal 5 by 40 feet along route no. 6, revised in 1924,
was $87,500. The latest (1928) approved estimate for annual cost
of maintenance is $5,000.
   The existing project was adopted by the River and Harbor Act of
March 2, 1919 (H. Doc. No. 200, 65th Cong., 1st sess.). The only
published map is in that document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-Trafic on the waterway in question is mainly
tributary to New Orleans.
   On Bayou Barataria the only public wharf is at Lafitte, this being
open to all commerce without charge.
   At Grand Isle, a truck-gardening community, a navigation dis-
trict has been organized for the purpose of constructing a canal and
wharves to facilitate the handling of the products, to be open to
all on equal terms, with charges only sufficient to pay for the work.
   The terminals are considered adequate for the existing commerce.
   Operations and results during fscaal year.-None.
   Condition at end of fiscal year..-The existing project was com-
pleted in 1925 at a saving of $14,462 under the estimated cost. The
controlling depths at mean low Gulf on June 30, 1934, were: In Big
610           REPORT       OF CHIEF OF ENGINEERS, U.                                    S. ARMY,        1934

Barataria, 13 feet; in Bayou Dupont, 5 feet; in Dupre Cut, 6 feet; in
Bayou St. Denis, 10 feet; in Barataria Bay, 4 feet; available through-
out the year.
  The total costs and expenditures under the existing project to the
end of the fiscal year were $97,397.99, of which $73,037.11 was for
new work and $24,360.88 for maintenance.
  Proposed operations.-The unexpended balance, $10,000, will be
applied to maintenance operation of one United States 15-inch
hydraulic dredge during the month of October 1934. This work will
provide a channel which will be adequate for existing commerce,
and no additional funds can be profitably expended during the fiscal
year 1936.
                                      Cost and financial summary
Cost of new work to June 30, 1934------     -------------------- $73, 037. 11
Cost of maintenance to June 30, 1934--------------------------- 24, 360. 88
            Total cost of permanent work to June 30, 1934 -------------                                         97, 397. 99
Net total expenditures ------------------------------------- 97, 397.99
Unexpended balance June 30, 1934---------    ------------------ 10, 000. 00
            Total amount appropriated to June 30, 1934--------------- 107,397. 99

        Fiscal year ending June 30                    1930              1931             1932        1933            1934


Cost of new work..     ------------            ---------
Cost of maintenance-                  .                               $23, 415. 34
                                               ......---------------------               $895. 26      $5. 63    .

Total expended           .........        ..                            23, 092. 41
                                                __----------------------------.....       897. 58     326. 24

Allotted,    ------------------------------            $6, 000       21, 500. 00      -3, 000. 00   -183. 77         $10, 000


Amount allotted from War Department Appropriation Act approved
  Apr. 26, 1934_-------------------                             $10, 000
Balance unexpended June 30, 1934-------------------------------- 10, 000

                             11. LITTLE CAILLOU BAYOU, LA.

   Location.-This bayou has its source in Bayou Terrebonne, 41/2
miles below Houma, La., and flows 32.8 miles in a southerly direc-
tion, emptying into Terrebonne Bay. (See U. S. Coast and Geo-
detic Survey Chart No. 198.)
   Existing project.-This provides for improvement from the head
of the bayou at Bayou Terrebonne, to Robinson Canal, about 20
miles, by removing obstructions and by dredging, to obtain a chan-
nel 5 feet deep at mean low water by 40 feet wide on the bottom.
The normal fluctuation of tide is 3 to 6 inches, but winds may raise
or lower the water surface about 1 foot. The estimate of cost for
new work was $85,000 and $3,000 annually for maintenance. These
estimates were made in 1922.
   The existing project was adopted by the River and Harbor Act
approved January 21, 1927 (H. Com. Doc. No. 5, 69th Cong., 1st
sess.).
  Local cooperation.-Fully complied with.
             RIVERS AND HARBORS-NEW                           ORLEANS,            LA., DISTRICT             611
   Terminal facilities.-Freightis unloaded directly on or from the
banks, and sugarcane is handled by means of stationary derricks.
These methods are satisfactory for the demands of commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-In 1928 and 1929 obstructions
were removed and the channel was dredged from the head of the
bayou to Robinson Canal, 20.6 miles, obtaining a channel 5 feet deep
at mean low Gulf by 40 feet wide on the bottom, and completing the
project at a saving of $7,238 under the estimated cost. The con-
trolling depth on June 30, 1934, was 4 feet available throughout the
year. The bayou is navigable throughout its length.
   The total costs and expenditures were $78,261.70, of which
$77,761.04 was for new work and $500.66 for maintenance.
   Proposed operaltions.-The unexpended balance, $15,000, will be
applied to maintenance operation of one United States 15-inch hy-
draulic dredge during the period July 16 to September 15, 1934. This
work will provide a channel which will be adequate for existing com-
merce, and no additional funds can be profitably expended during
the fiscal year 1936.
                                   Cost and financial summary
Cost of new work to June 30, 1934-------------------------- $77, 761. 04
Cost of maintenance to June 30, 1934---------------------------- 500. 66

Total cost of permanent work to June 30, 1934------------------78, 261.70
      Net total expenditures-----------     ------------------- 78, 261. 70
Unexpended balance June 30, 1934------------------------------  15, 000. 00
         Total amount appropriated to June 30, 1934---------------                                   93, 261. 70

       Fiscalyear ending June 30                      1930     1931            1932        1933            1934


Cost of new work--     ....----
                             ....--            $17, 125. 67-. . .          .. .    . .    . ..       ./.    . .
Cost of maintenance _-__-----------___--___   _$91.                   16      $122. 36     $287. 14 --.

Total expended .....-----
                      ___....-____              24, 232. 32     79. 79          120. 47     300. 40 _        --
Allotted--------------I-
        .....            ......---                                          -6, 500. 00   -238. 30         $15, 000

Amount allotted from War Department Appropriation Act approved
                 ------------------------------------------------- $15, 000
  Apr. 26, 1934....
Balance unexpended June 30, 1934_      _____    _____               15, 000

              12. BIG PIGEON AND LITTLE PIGEON BAYOUS, LA.

   Location.-These bayous lie in the south central part of Louisiana.
 (See, U. S. Geological Survey, Louisiana, Chicot and Foster Quad-
rangles.) Big Pigeon Bayou connects Grand River and Grand Lake.
Little Pigeon Bayou connects Big Pigeon Bayou with Grand Lake.
   Existing project.-This provides for the removal of obstructions in
Big Pigeon and Little Pigeon Bayous throughout their entire length.
The variation of water surface due to floods from the Atchafalaya
River is from 1 to 5 feet.
   There is no approved estimate of cost for new work nor for annual
maintenance.
612        REPORT           OF CHIEF OF ENGINEERS,                              U.     S.     ARMVIY,          1934


   The existing project was authorized by the River and Harbor Act
of July 13, 1892, and subsequent acts authorized the use of funds for
maintenance. The latest published map is printed opposite page
2442, Annual Report for 1916.
   These bayous were formerly carried under the project " Bayou
Plaquemine, Grand River, and Pigeon Bayous, La." Bayou Plaque-
mine and Grand River now form a part of the Louisiana and Texas
Intracostal Waterway from Mississippi River at or near New
Orleans, La., to Corpus Christi, Tex. (New Orleans-Sabine River
section), and are included therein.
   Terminal facilities.-None.
   Operations and results during fiscal year.-The U. S. bucket
dredge Grossetete began work in these bayous on February 20, 1934,
removed 39,261 cubic yards of material and 4,019 snags, and com-
pleted the work on May 19, 1934. The total costs were $12,520.54,
and the total expenditures were $12,324.72, all for maintenance.
   Condition at end of fiscal year.-On June 30, 1934, the controlling
depth on Big Pigeon Bayou was 8 feet in the stream and 7 feet at
Grand Lake entrance; and in Little Pigeon Bayou, 7 feet, available
throughout the year. The channels are in good condition. The
project is for maintenance only.
   The total costs were $37,669.20, all for maintenance. The total ex-
penditures were $39,297.08, all for maintenance.
   Proposed operations.-The balance unexpended at the end of the
fiscal year including accounts receivable, a total of $2,288.70, will be
applied to payment of accounts payable and to such maintenance
work as may be necessary.
   No additional funds can be expended during the fiscal year 1936,
as the present channel is adequate for existing commerce.
                                       Cost and finanoa summary

Cost of maintenance to June 30, 1934____------------                                                              $37, 669. 20

Total cost of permanent work to June 30, 1934___------------------ 37, 669. 20
Value of plant, materials, etc., on hand June 30, 1934------------1, 379. 49
      Net total cost to June 30, 1934__ ..-----------------                                                           39, 048. 69
Plus accounts receivable June 30, 1934--------------------------                                                         300. 30

      Gross total costs to June 30, 1934 .___-----------                                                              39, 348. 99
Minus accounts payable June 30, 1934_----
                                       ............                                                    -__--               51. 91

     Net total expenditures --------            -      -------                                                         39, 297. 08
Unexpended balance June 30, 1934 ..---.-------------------                                                            - 1, 988.40

         Total amount appropriated to June 30, 1934_____________                                                      41, 285. 48

        Fiscal year ending June 30                         1930         1931                1932           1933            1934


Cost of new work...------               ------------               ------------.-----------------------------
Cost of maintenance____-        ___-                 ______
                                                      -___ ____         $103. 70            $673.65    ------------      $12, 520. 54
Total expended..             ....-----------------------------------       90. 70        2, 406. 57        $103. 78       12, 324. 72

Allotted ....... ..----------------------------------                  ......----------- -4, 000. 00       -21. 60        12, 866. 36
         RIVERS AND HARBORS-NEW               ORLEANS, LA.,        DISTRICT        613

Balance unexpended July 1, 1933                                    $1, 446. 76
Amount allotted from War Department Appropriation Act
  approved Apr. 26, 1934-.....      111111111111111111 $1, 000.00
Amount allotted from War Department Appropriation Act
  approved Mar. 4, 1933------- ----    ___------------- 7, 360. 33
Amount allotted from War Department Appropriation Act
  approved July 14, 1932_      _______--------------1, 552. 42
Amount allotted from War Department Appropriation Act
  approved Feb. 28, 1929------------------------------- 3,000. 00
                                                                   12, 912. 75

     Amount to be accounted for_       _______------- __-- -   -14,             359. 51
Deductions on account of revocation of impounded funds-----------                46. 39

      Net amount to be accounted for--------___--------------             14, 313.12
Gross amount expended     _____-----__                                    12, 324. 72

      Balance unexpended June 30, 1934__---       __------- -    -            1, 988. 40
Outstanding liabilities June 30, 1934 __------___---------------                 116. 35

Balance available June 30, 1934____-- --   __------------------               1, 872. 05
Accounts receivable June 30, 1934_-----       ....------.------------            300. 30

      Unobligated balance available June 30, 1934_ ..----------               2, 172. 35

                        13. BAYOU GROSSETETE, LA.

   Location.-This bayou rises in Pointe Coupee Parish, La., and ex-
tends in a generally southeastern direction, entering Bayou Plaque-
mine 8 miles below Plaquemine Lock. (See U. S. Coast and Geodetic
Survey Chart No. 1116 for mouth and Geological Survey map, Bayou
Sara Quadrangle (La.) for the bayou above the improvement.)
   Existing project.-This provides for improving the stream for a
distance of 29 miles from its mouth to a point 5 miles above Marin-
gouin, La., by removing snags and trees and by dredging a channel
60 feet wide on bottom and 5 feet deep at mean low water. Mean
low water is 2 feet above mean low Gulf level. Under ordinary
conditions the mean raiige of tide is about 3 inches at the mouth and
nothing at the head, and the extreme range about 6 inches at the
mouth. The variation of water surface due to flood conditions may
be from 2 to 8 feet. The estimate of cost for new work, revised in
1932, is $130,000. The latest (1912) approved estimate for annual
cost of maintenance is $500.
   The existing project was adopted by the river and harbor act of
July 25, 1912. (H. Doc. No. 348, 62d Cong., 2d sess.) The latest
published map is printed opposite page 2540 of the Annual Report
for 1917.
   Terminal faeilities.-There are no wharves on the bayou. The
banks are firm and high. The steamboats and launches operating on
the stream unload their cargoes at any desired point, carrying the
freight by hand into the stores, which are generally on the bank of
the bayou. The facilities are considered adequate for the existing
commerce.
   Operations and results duringq fiscal year.-The United States
bucket dredge Grossetete began work in this bayou on December 16,
1933, and removed 41,103 cubic yards of material and 1,248 snags
and stumps. Work was discontinued February 19, 1934, for lack of
funds. The total costs and expenditures were $8,388.95, all for
maintenance.
614           REPORT         OF CHIEF OF ENGINEERS, U.                            S. ARMY,           1934


   Condition at end of fiscal year.-A channel 5 feet deep at mean
low water and 60 feet wide on bottom was completed in 1914 to
mile 10.3, and from that point to the head of a project a 5- by 40-foot
channel was dredged in 1916 and redredged in 1923. The existing
project is about 15.8 percent complete, that portion of the stream
above mile 10.3 remaining to be dredged 20 feet wider. The con-
trolling depths at mean low water on June 30, 1934, were: From
mouth (mile 0) to mile 12, 5 feet; mile 12 to mile 13, 2.2 feet;
mile 13 to mile 27, 5 feet; mile 27 to mile 29 at head of navigation,
3 feet.
   The total costs and expenditures under the existing project to the
end of the fiscal year were $60,251.85, of which $29,392.49 was for
new work and $30,859.36 for maintenance.
   Proposed operations.-The unexpended balance, $10,000, will be
applied to maintenance operation of one United States bucket dredge
in removing shoals from Bayou Grossetete during the period April
1, 1935, to June 30, 1935.
   This work will provide a channel which will be adequate for
existing commerce, and no addditional funds can be profitably
expended during the fiscal year 1936.
                                         Cost and financial sumnary

Cost of new work to June 30, 1934_ ....__..........__       __-                                            $29, 392. 49
Cost of maintenance to June 30, 1934---------------------__                                                 30, 859. 36

         Total cost of permanent work to June 30, 1934------------                                          60, 251. 85

Net total expenditures----------                               ------------------                           60, 251. 85
Unexpended balance June 30, 1934                           -----------------                                10, 000. 00
         Total amount appropriated to June 30, 1934 ------------.                                           70, 251. 85

        Fiscal year ending June 30                       1930        1931           1932            1933        1934


Cost of new work           --------------------
Cost of maintenance-------------             ------     ----        $18. 69
                                                      -------........             $5, 980. 28   ------------   $8, 388. 95

Total expended--                _--------------------------------    -10.   56     5, 988. 41------------       8, 388. 95
Allotted---    -   -----      ---------      -----       -------    6, 000.00         -1.03 ------- -          18, 388.95


Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934------------------------------------------        $10, 000.00
Amount allotted from War Department Appropriation Act approved
July 14, 1932       ------------------------------------------  10, 000. 00

     Amount to be accounted for___-----                         20,000. 00
                                                -________----------
Deductions on account of-
   Revocation of impounded funds-__ -   --------        $58. 63
   Revocation of allotment--------------------       1, 552. 42
                                                                 1, 611.05

       Net amount to be accounted for___--__-__------....-                                                  18, 388.95
Gross amount expended__--     ----------------------------                                                  8, 388. 95

         Balance unexpended June 30, 1934 -----                                  .-----------               10, 000. 00
Amount (estimated)   required to be appropriated for completion of
  existing project 1 --      _               -
                                         .---.---   -      -        100, 600.00
   1Exclusive of available funds.
            RIVERS AND HARBORS-NEW                         ORLEANS,   LA., DISTRICT      615
                                    14. BAYOU TECHE, LA.

  Location.-Bayou Teche has its source in Bayou Courtableau, in
St. Landry Parish, and flows in a southeasterly direction a distance
of 125 miles, to where it joins the lower Atchafalaya River, about
101/2 miles above Morgan City, La. (See U. S. Coast and Geodetic
Survey Chart No. 1116.)
  Previous project.-Authorized by River and Harbor Acts of July
11, 1870, and September 19, 1890. The cost and expenditures were
$45,704.43. For further details see page 1851, Annual Report for
1915.
  Existing project.-This provides for a channel 8 feet deep and 80
feet wide on the bottom from the mouth of the stream to New Iberia,
La., 54.5 miles, thence 6 feet deep and 60 feet wide on the bottom to
Keystone Lock, 18 miles, and thence 6 feet deep and 50 feet wide on
the bottom to Arnaudville, La., 34 miles, to be secured by dredging,
removing snags and overhanging trees, and construction of a lock
and dam and regulating works. The plane of reference is mean
Gulf level.
                                            Keystone locl
Distance from New Iberia--------------------------                        18 miles.
Distance from intracoastal waterway-----------------                      82.5 miles.
Width of chamber _...___.__------------___           --                   36 feet.
Length available for full width_--__--__   - ------                       160 feet.
Lift        -------------------------------------------- 8 feet.
Depth on miter sill at mean Gulf level_-_____--____      8 feet.
Character of foundation        ____   ___------
                                           -         __  Timber piles.
Kind of dam_ .... ___...._______-----  -        ---.   _ Timber, rock-fill.
Type of construction--------------                       Concrete.
Percentage of completion------                    -----------   --------- Completed in 1913.
Cost    ---------------------------------------                           $257,720.48.
   The auxiliary dam across Bayou Vermilion, 135 feet from the
junction of Bayous Fusilier and Bourbeau, has decayed and is no
longer effective. There are also four controlling gates, each 31/2 feet
.in the clear, in Spanish Lake Canal, between Bayou Teche and
Spanish Lake, about 1 mile from Keystone Lock, La.
   Under ordinary conditions the mean range of tide is about 10
inches at the mouth, 4 inches just below the lock, and zero above the
lock, the extreme range of tide being about 12 inches, 6 inches, and
zero, respectively. The variation of the water surface above Key-
stone Lock due to freshets is from 2 to 7 feet, while just below the
lock it has been as high as 12 or 15 feet and near the mouth about
4 or 5 feet.
   The estimate of cost for new work, revised in 1928, is $850,000, ex-
clusive of amount expended on previous projects. The latest (1928)
approved estimate for annual cost of maintenance from mouth to
Arnaudville is $6,000.
   The existing project was authorized by the following river and
harbor acts: The act of September 19, 1890, provided for the im-
provement of the stream from its mouth to St. Martinville by re-
moving obstructions and dredging (Annual Report for 1889, p.
1532); the act of March 2, 1907, provided for the construction of
the lock and dam and the extension of the improvement to Arnaud-
ville (H. Doc. No. 527, 59th Cong., 1st sess.); the act of March 2,
1919, provided for the increased channel dimensions from the mouth
616    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,          1934

to Keystone Lock (H. Doe. No. 1329, 62d Cong., 3d sess.). The
latest published map is in House Document No. 288, Sixty-sixth
Congress, first session.
   Local cooperation.-Expenditurefor 6-foot navigation to Arnaud-
ville, La., was " contingent upon all lands necessary for lock and
dam purposes and canal feeders being deeded to the United States
free of cost, and upon the United States being secured against pos-
sible claims for damages resulting from the overflow of lands by
reason of lock and dam improvements or from the draining of
Spanish Lake." The land for lock and dam site was deeded to the
United States in 1909. Personal bonds, dated August 4, 1909, were
given to the amount of $10,000 to secure the United States against
the above-mentioned claims and were accepted September 29, 1909.
The River and Harbor Act of March 2, 1919, provided " that no
expense shall be incurred by the United States for acquiring any
lands or easements required for the purpose of this improvement."
    Terminal facilities.-Between the mouth and Breaux Bridge there
are a few small private wharves. Steamboats operating on the bayou
load or discharge their cargo directly on the banks. Through rates
exist from the mouth to Jeanerette, at which point there is a slip
about 400 feet long, the Southern Pacific Railroad tracks paralleling
the slip. Barges are towed to this slip and cargo is transferred by
means of conveyors. The terminal facilities are considered adequate
for the existing commerce. Practically all wharves are privately
owned, but public landing is permitted without charge.
    Operations and results dur'ing fiscal year.-The U. S. dredge Dela-
tour began work in the lower portion of the bayou on August 28,
1933, and removed 327 262 cubic yards of material and 129 snags.
The total costs were $44,595.33, and the total expenditures were
$41,007.06, all for maintenance.
   Condition at end of fiscal year.-The existing project is about 84
percent complete. The lock and dam were completed in 1913. The
dredging and snagging done in 1916 completed that part of the
existing project for the 6- by 50-foot channel from Arnaudville to
Keystone Lock. The contract dredging done in 1918-20 completed
that part of the previous project for a 6-by 50-foot channel from
Keystone Lock to mile 39.7 above the mouth. The 8- by 80-foot chan-
nel from New Iberia to the mouth is about 98 percent complete.
From the mouth to mile 5.8, a channel 8 by 80 feet, or greater, already
existed, and a new channel has been excavated 8 by 80 feet from
this point to mile 50.06, about 3.65 miles below New Iberia and 8 by
60 feet from this point to New Iberia. The work required to com-
plete the project is the widening of the channel to a bottom width
of 80 feet from mile 50.06 to New Iberia and to a bottom width of
60 feet from New Iberia to Keystone Lock. The lock and dam are
in good condition. The channel conditions are good from the mouth
to New Iberia and fair above that point.
    The controlling depths on June 30, 1934, at mean low Gulf level
were: Mouth to New Iberia, 8 feet; New Iberia to Breaux Bridge,
6 feet; Breaux Bridge to Arnaudville, 4 feet; available throughout
the year.
    The total costs were $972,583.10, of which $708,625.40 was for new
work and $263,957.70 for maintenance. The total expenditures were
 $1,030,344.60.
               RIVERS AND HARBORS-NEW                                  ORLEANS, LA., DISTRICT                                   617
   Proposed operations.--The balance unexpended, including accounts
receivable, at the end of the fiscal year, $19,222.03, will be, applied
as follows:
Maintenance operation of 1 United States pipe-line dredge during
   the months of October and November 1934_____________________ $17, 201. 71
Accounts payable June 30, 1934--  ----------------------------     , 020. 32
            Total-_                      ---------------------------------                                              19, 222. 03
    This work will provide a channel which will be adequate for exist-
ing commerce, and no additional funds can be expended during the
fiscal year 1936.
                                         Cost and financial summary
Cost of new work to June 30, 1934         ______________                                                          $754, 329. 83
Cost of maintenance to June 30, 1934___________________________                                                    263, 957. 70
       Total cost of permanent work to June 30, 1934------      _   1, 018, 287. 53
Value of plant, materials, etc., on hand June 30, 1934____________     50, 587. 07
       Net total cost to June 30, 1934  .___________________                                                    1, 068, 874. 60
Plus accounts receivable June 30, 1934_____-_____________                                                           9, 194. 75
      Gross total costs to June 30, 1934______  ______________ 1, 078. 069. 35
Minus accounts payable June 30, 1934_________________________       2. 020. 32
      Net total expenditures ____________-___-________                                                          1, 076, 049.03
XJnexpended balance June 30, 1934_                                                                                  10, 027.28
            Total amount appropriated to June 30, 1934______________ 1,086. 076. 31

            Fiscal year ending June 30                      1930         1931           1932               1933              1934


Cost of new work___....___ ____ ____       -_ -$77. 57                   $875. 74    $2, 655. 83 ............                - ---.......
Cost of maintenance-- ______-- ____________.---.   _                                 65, 275. 61 $46, 985. 03              $44, 595. 33

      Total cost..------------      -    --------------------             -------    67, 931.44 ........................
Total expended             ____-___-__                 -44,
                                                        -_____-
                                                             632. 63   91, 230. 38   49, 333. 59        46, 367. 32         41, 007. 06

Allotted.                  ---   _________         .....-.....
                                                    __ _________       75, 983. 24    1, 908. 09        74, 952. 20          7, 846. 60


Balance unexpended July 1, 1933                _ __       _        $43, 187. 74
Amount allotted from War Department Appropriation Act
  approved Apr. 26, 1934-------------------------$4, 000. 00
Amount allotted from War Department Appropriation Act
approved Mar. 4, 1933 __________________ 10, 999.70
Amount allotted from War Department Appropriation Act
approved July 14, 1932 _______  ____-   -              15, 812.56
                                                    -______
                                                                    30, 812. 26
      Amount to be accounted for            ______-------____      __-- -74,   000. 00
Deductions on account of-
   Revocation of impounded funds___-----------                7, 965. 66
   Revocation of allotment ---------------------           - 15, 000. 00
                                                                           22, 965. 66

      Net amount to be accounted for _____________________       _                                                    51, 034.34
Gross amount expended_- ----   ____-                 -41,
                                            -_____-____    105. 59
Less receipts from sales                  __       __       98. 53
                                                                                                                      41, 007. 06
        Balance unexpended June 30, 1934-.... -                                                                       10, 027. 28
618         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                19 34

Outstanding liabilities June 30, 1934----------                              ---------------                   $4, 790. 46
     Balance available June 30, 1934----- ------------
Accounts receivable June 30, 1934__.___-                            ____         _______-----     -___-- 5, 236. 82
                                                                                                         9,194. 75
      Unobligated balance available June 30, 1934----- ----                           -14, 431. 57
Amount (estimated) required to be appropriated for completion of
                  - - - - - - - - -- - - - -- - -- - -- - -- - -- - -- - -- -- - -- -
existing project                                                                       141, 400. 00
            15. OPERATING AND CARE OF PLAQUEMINE LOCK, LA.
   The improvement for which report is made under this caption
forms part of the project for the Louisiana and Texas Intracoastal
Waterway from the Mississippi River at or near New Orleans, La.,
to Corpus Christi, Tex. (New Orleans-Sabine River section). See
pages 620 to 629 of this report. The completed lock has been oper-
ated and maintained under the permanent indefinite appropriation
since July 1, 1909,
   Operations and results during fiscal year.-The lock structures and
grounds were maintained in good condition and all necessary routine
and maintenance work thereon performed.
  The total costs were $31,285.23, all for maintenance. The total
expenditures were $26,035.67.
  Condition at end of fiscal year.-The United States reservation
comprises 19 acres. The controlling depth on June 30, 1934, was 10
feet at low water. The total costs were $629,190.53, all for mainte-
nance. The total expenditures were $632,934.95.
  Proposed operations.-The lock and grounds will be operated and
maintained under allotments from appropriations made available for
such purposes.
                           Cost and financial summnary
Cost of maintenance to June 30, 1934 __       ___________-___$629, 190. 53
Value of plant, materials, etc., on hand June 30, 1934-....----- 7, 965. 36
      Net total cost to June 30, 1934----------------------------  637, 155. 89
Plus accounts receivable June 30, 1934 ---------------------------      183. 50

     Gross total costs to June 30, 1934_ ...      __-----__-                                              637, 339. 39
Minus accounts payable June 30,1934_111      __11111111__11                                                 4,404.44

     Net total expenditures__---- -----_____-_                                                            632, 934. 95
Unexpended balance June 30, 1934_                                                                           8, 411. 12

         Total amount appropriated to June 30, 1934__________--                                           641, 346. 07

           Fiscal year ending June 30            1930           1931            1932               1933            1934


Cost of new work .           ------------------
Cost of maintenance_-------- ------ ---- $22, 523. 14        $23, 515. 25   $27, 010. 59     $32, 967. 28        $31, 285. 23
Total expended       -----------------------   24, 361. 23    23,472. 84      24, 397. 35        34, 208. 26      26, 035. 67

Allotted...-------   --------------------- 22, 500. 00        27, 500. 00     25, 000. 00        28, 170. 75      31, 300. 82

Balance unexpended July 1, 1933------_____------------ ----      $3, 145.997
Amount allotted from permanent indefinite appropriation, sec. 6,
  River and Harbor Act, Mar. 3, 1909-----------------------      32, 350. 00

         Amount to be accounted for                  __              ___-------------------35,                    495. 97
Deductions on account of revocation of impounded funds-                                     --             - 1,049. 18
         Net amount to be accounted for_-.... ---. -34,                                                           446. 79
   1 Exclusive of available funds.
              RIVERS AND HARBORS-NEW                                   ORLEANS, LA., DISTRICT                           619
Gross amount expended--------------------------$26, 058. 67
Less receipts from sales------------------------------ 23. 00
                                                                                                                 $26,035.67
      Balance unexpended June 30, 1934- --     __---           __-- 8, 411. 12
Outstanding liabilities June 30, 19,34--------------------------6,     549. 72
     Balance available June 30, 1934____-___-----_______                                                          1,861. 40
Accounts receivable June 30, 1934______________                                                                     183. 50

     Unobligated balance available June 30, 1934-.-----------                                                 2,044. 90
Amount allotted for fiscal year 1935_-------   _____                                                     ___-30, 500. 00
Balance available for fiscal year 1935____                                 ___       ________                    32, 544. 90

16. OPERATING AND CARE OF KEYSTONE LOCK, BAYOU TECHE, LA.

   The improvement for which report is made under this caption
forms part of the project for Bayou Teche, La.                                            See pages 615 to 618
of this report, where general information may be found.                                                     The com-
pleted lock and dam have been operated and maintained under the
permanent indefinite appropriation since July 1, 1913.
   Operations and results during fiscal year.-The lock, dam, struc-
tures, and grounds were maintained in good condition and all neces-
sary routine and maintenance work thereon performed.
  The total costs were $3,966.57, all for maintenance. The total
expenditures were $3,902.66.
  Condition at end of fiscal year.-The United States reservation
comprises 12.27 acres. The controlling depth on June 30, 1934, was
8 feet at mean Gulf level.
  The total costs were $86,023.78. The total expenditures were
$86,156.84.
  Proposed operations.-The lock, dam, and grounds will be oper-
ated and maintained under allotments from appropriations made
available for such purposes.
                                         Cost and financial summary

Cost of maintenance to June 30, 1934 ___ -____------__                                                      $86, 023. 78
Value of plant, materials, etc., on hand June 30, 1934_-........ __.                                             230. 64

      Net total cost to June 30, 1934 ____----------86,                                                             254. 42
Minus accounts payable June 30, 1934 ....__..___..                                         -__ ----___      -        97. 58

     Net total expenditures----------------------------                                                          86, 156. 84
Unexpended balance June 30, 1934 .____----------                                          ----                      777.90

        Total amount appropriated to June 30, 1934_ ....                                ____-----                86, 934. 74

        Fiscal year ending June 30                        1930           1931          1932          1933            1934


Cost ofnew work....--------------------------------
Cost of maintenance---_----------------                $3, 597. 54     $3, 286. 86   $3, 639. 91   $3, 583. 37      $3, 966. 57

Total expended------         ----------------           3, 607. 03      3, 721. 79    3,476. 40     3,768. 28        3, 902. 6.

Allotted- _        ..-----------------     ...----------- 2, 500. 00    3,'000. 00    3, 500. 00    3, 234.42        4, 208. 81
620     REPORT OF CHIEF OF ENGINEERS,             U.   S. ARMY,   1934

Balance unexpended July 1, 1933----------------------------------$471. 75
Amount allotted from permanent indefinite appropriation, section 6,
River and Harbor Act, March 3, 1909---------------------_          4, 420. 00
      Amount to be accounted for-------------------------------          4, 891. 75
Deductions on account of revocation of impounded funds----- ---             211. 19

      Net amount to be accounted for----------------------------4,          680. 56
Gross amount expended-----------,-------------------                     3, 902. 66

      Balance unexpended June 30, 1934--------------------------           777. 90
Outstanding liabilities June 30, 1934------------------------------        118. 04

     Balance available June 30, 1934-----------------------------659. 86
Amount allotted for fiscal year 1935------------------------------ 5, 500. 00

      Balance available for fiscal year 1935 ------------------          6,159. 86

17. THE LOUISIANA AND TEXAS INTRACOASTAL WATERWAY FROM
  THE MISSISSIPPI RIVER AT OR NEAR NEW ORLEANS, LA., TQ
  CORPUS CHRISTI, TEX. (NEW ORLEANS-SABINE RIVER SECTION)

   Location.-This section of the intracoastal waterway extends from
the Mississippi River at or near New Orleans to the Sabine River,
La. and Tex.
   The section from the Mississippi River to Atchafalaya River, La.,
leaves the Mississippi River about 3 miles above Canal Street and
follows Harvey Canal No. 1, Bayou Barataria, to Bayou Villars, a
land cut south of Lake Salvador to Harvey Canal No. 2, Harvey
Canal No. 2 to La Rose, La., on Bayou Lafourche, up Bayou
Lafourche to Lockport, La., on Company Canal, through Company
Canal and a land cut to Houma, La., thence over a land cut south
of Bayou Black to Bayou Cocodrie, thence through Bayou Cocodrie
and a land cut to Bayou Black, thence through Bayou Black, Bayou
Chene, and Bayou Boeuf to the Atchafalya River about 0.5 mile
south of Morgan City, La., a total distance of 102 miles.
   Harvey Canal connects with the Mississippi River by Harvey
Lock at Harvey, La., opposite New Orleans, about 3 miles above
Canal Street.
   The other route follows the Mississippi River to Plaquemine,
Bayou Plaquemine, and the Granfd River system to Morgan City, a
total distance of 176 miles. Bayou Plaquemine connects with the
Mississippi River by Plaquemine Lock, 112 miles above New Orleans,
La.
  The section from the Atchafalaya River to Vermilion River, La.,
begins at the western end of the Mississippi-Atchafalaya section and
follows the Atchafalaya River 2.5 miles, portions of Little Wax
Bayou, Possum Bayou, cut-offs, a land cut passing through North
Bend Plantation to Bayou Bartholomew, Bayou Bartholomew to
Little Bay, a land cut skirting the north edge of Cote Blanche Island
and the west edge of Weeks Island to Vermilion River, about 24
miles below Abbeville, La., a total distance of about 63 miles.
  The section from Vermilion River to Mermentau River, La., begins
at the western end of the Atchafalaya-Vermilion section and follows
Vermilion River 1.3 miles, a part of the Schooner Bayou cut-off
canal, and a land cut running in a general northwesterly direction to
Mermentau River at a point about 0.5 mile above its entrance into
Grand Lake and about 16 miles below the town of Lake Arthur, La.,
       RIVERS AND HIARBORS-NEW        ORLEANS, LA., DISTRICT      621

a total distance of about 43 miles. Vermilion Lock is being con-
structed about 1.75 miles west of Vermilion River to prevent the
ingress of salt water from Vermilion Bay. Data regarding the lock
are given in the paragraph Existing project.
   The section from Mermentau River to Calcasieu River, La., begins
at the western end of the Vermilion-Mermentau section and follows
the Mermentau River upstream for about 1.5 miles, a land cut run-
ing in a west-southwesterly direction to Lake Misere, passing north
of the lake and Bayou Misere, westerly to Sweet Lake, south and
west of Sweet Lake, northwesterly to Bayou Tete Bois, Bayou Tete
Bois, Black Bayou, and cut-offs to a point on Calcasieu River about
16.6 miles below the city of Lake Charles, La., a total distance of
about 38 miles.
   The section from the Calcasieu River to Sabine River, La. and
Tex., begins at the western end of the Mermentau-Calcasieu section
and follows the Calcasieu River upstream about 1.6 miles, a land cut
running in a southwesterly direction 2.8 miles, thence west 22 miles
to Sabine River at a point about 3 miles below Orange, Tex., a total
distance of about 26 miles. (See U. S. Coast and Geodetic Survey
Chart No. 1116.)
   Previous projects.-The projects for the different sections of this
improvement were adopted by the following river and harbor acts:
August 11, 1888; March 2, 1907; June 25, 1910; March 2, 1919;
March 3,1909, February 27, 1911; July 25, 1912; August 8, 1917;
July 18, 1918, and September 22, 1922. The total cost of work
under these projects has been $4,440,020.11, of which $3,991,058.63
was for new work and $448,961.48 for maintenance. The total ex-
penditures have been $4,483,469.03. In addition, $273,266.97 of
contributed funds has been expended for new work. (For further
details see pp. 878-895 of Annual Report for 1924.)
   Existing project.-This provides for a waterway from the Missis-
sippi River at or near New Orleans, via two routes to Morgan City,
La., thence via one route to the Sabine River, La. and Tex., having
a depth of 9 feet at mean low water and a bottom width of 100
feet with appropriate side slopes, with such passing places, widen-
ing at bends, lock or guard locks, and railway bridges over artifi-
cial cuts as are necessary, and for the purchase or construction of a
pipe-line dredge. The length of this section of the waterway is
346 miles via the northerly or Plaquemine route and 272 miles via
the southerly or Harvey Canal route.
   Maintenance of a channel 5 feet deep at mean low water and 40
feet wide on bottom, with appropriate side slopes and overcut, from
the Mississippi River at or near New Orleans to Morgan City, La.,
via the Harvey and the Company Canals; and the maintenance of a
5- by 40-foot channel along other sections of the route, authorized
by the acts cited in Previous projects, until the completion of the
9- by 100-foot channel described above is contemplated.
   Under ordinary conditions the mean range of tide is about 10
inches and the extreme about 14 inches. A severe storm may cause
a high tide of from 6 to 9 feet.
   The estimate of cost for new work of the 9- by 100-foot waterway,
revised in 1927, exclusive of amounts expended on previous projects,
is $9,752,000, including $500,000 for a dredge, with $185,000 annually
for maintenance.
622      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                 1934

                                  HARVEY LOCK

Miles from New Orleans (Canal Street)___ 3.
Miles from Mississippi River---------- --. 0.13.
Width of chamber -------------------       75 feet.
Length available for full width---------- 425 feet.
Lift         -------------------------------
                                           0.0 to 19.6 feet.
Depth on miter sill at low water--------- 12 feet.
Character of foundation---------------     Timber piles.
Kind of dam-----------------------.        None.
Type of construction...------------      - Reinforced concrete.
Percentage of completion -------------- 93.
Estimated cost (including approaches) ... $1,852,000.

                               PLAQUEMINE    LOCK

Miles from New Orleans (Canal Street) . 112.
Miles from Mississippi River----------.     0.10.
Width of chamber------------------ . 55 feet.
Length available for full width----------260 feet.
Lift       ------------------------------- 0.0 to 28 feet.
Depth on miter sill at low water-------- 10 feet.
Character of foundation -----------         Timber piles.
Kind of dam -----------------------         None.
Type of construction -- __----------      . Concrete.
Percentage of completion---------           Completed, 1909.
Cost------------------------------          $1,302,006. 38.
                                VERMILION   LOCK

Miles from Abbeville, La--------------- 26.
Miles from Vermilion River-----------.     1.75.
Width between abutments_____--        ---- 56 feet.
Length available for full width----------1,182 feet.
Lift__-------------------------------      0.0' to 5 feet, either direction.
Depth on gate at mean low Gulf level- -. 12 feet
Character of foundation---------------     Timber piles.
Kind of dam------------------------ Reinforced-concrete spillway dam,
                                              vertical cast-steel gates, timber-
                                              pile foundations.
Type of construction- ---------------      Reinforced concrete.
Percentage of completion--------------- 95.
Estimated cost---------------------- $300,000.
   The existing project was adopted by the River and Harbor Acts
of March 3, 1925, and January 21, 1927 (H.Doc. No. 238, 68th Cong.,
1st sess.). The latest published maps are in this document.
   Local cooperation.--The River and Harbor Act of March 3, 1925,
provides that no expense shall be incurred by the United States for
acquiring any lands required for the purpose of this improvement,
that local interests shall defray the cost of constructing or re-
modeling all highway bridges, togetler with their subsequent main-
tenance and operation, and shall furnish, without cost to the United
States, all rights-of-way and necessary spoil-disposal areas; and that
work on the New Orleans-Sabine River section shall not be com-
menced until the Secretary of War has received satisfactory assur-
ances that there will be available by the date of its completion
adequate vessels, terminals, and auxiliary equipment for the eco-
nomical handling of at least 500,000 tons of commerce annually.
  The above-mentioned assurances were accepted by the Secretary of
War under date of March 12, 1929. Local interests have secured
the necessary rights-of-way and spoil-disposal areas, and the titles
       RIVERS AND HARBORS-NEW        ORLEANS,   LA.,   DISTRICT   623

to the deeds have been accepted by the Secretary of War, and the
Chief of Engineers as follows: Mississippi River to Bayou Blue,
November 5, 1931; Bayou Blue to Atchafalaya River, June 11, 1931;
Plaquemine to Morgan City, November 6, 1929; Atchafalaya River
to Vermilion River, February 14, 1928, and August 1, 1929; Vermil-
ion River to Mermentau River, February 14, 1928, and July 15, 1929;
Mermentau River to Calcasieu River, April 4, 1929; Calcasieu River
to Sabine River, January 15, 1913.
   Terminal facilities.-At the Mississippi River end of the Harvey
Canal there is a Government-owned wharf open to all, free of charge.
On Bayou Terrebonne, at Houma, there are several small privately-
owned wharves. On the Atchafalaya River, at Morgan City, there
are 2 large and 3 small wharves open to all without charge; there
are several private wharves. The terminal facilities are considered
adequate for the existing commerce.
            OPERATIONS AND   RESULTS DURING FISCAL YEAR

  Mississippi River-Atchafalaya River section.-Regular fwnds.-
Maintenance work on the 9- by 100-foot channel consisted of removing
101,334 cubic yards of material from this section, and 262,234 cubic
yards from the Plaquemine-Morgan City alternate route.
   New work during the fiscal year was as follows:
  Harvey Lock.-Dredging backfill around lock up to ground level
and filling old Harvey Canal from old lock south to Fourth Street in
Harvey, La., by hired labor and Government plant was completed.
   Removal of Government-owned steel sheet piling in east coffer
wall of the original lock cofferdam was effected under contract.
   Construction of the upper approach guide levees to the lock by
hired labor, and Government plant was completed. A total of 82,-
756 cubic yards of material was removed from the upper approach
channel.
   Construction under contract of the lower approach channel bulk-
heads, the bulkhead across the old canal channel below Fourth
Street in Harvey, La., and the paved apron in the lower approach
channel was completed in March 1934.
   Construction of the timber guide walls, mooring dolphins, and
levee revetments in the upper lock approach was completed under
contract.
   Installation of 880 linear feet of a chain-link protection fence
around the warehouse-yard area along the lower approach to the lock
was completed under contract.
  Machinery for the lock-repair shop was purchased. Miscellaneous
small construction work was carried on throughout the year by hired
labor and Government plant.
   Harvey railroad bridge.-A double-track bascule bridge was con-
structed and the approach tracks raised to grade under contract.
   Harvey Lock to station 55.-Hired-labor work of enlarging the
5- by 40-foot canal to 9- by 100-foot project consisted of dredging
372,450 cubic yards of material from the subdivision Harvey Lock
to station 55, some of which was deposited as backfill for the new"
Harvey Lock and the old canal. An additional 42,804 cubic yards
of material was dredged from the forebay.
     91536-ENG 1934-40'
624    REPORT   OF CHIEF   OF ENGINEERS,    U.   S.   ARMY   1934


   Harvey to Bayou Blue.--Under contract, 385,458 cubic yards of
material were dredged to complete 2.4 miles of canal.
   Bayou Lafouche.-A total of 30,728 cubic yards of material was
dredged by hired labor in deepening this stream to project dimen-
sions over a distance of four-tenths mile.
   A steel sheet bulkhead 212 feet long was constructed under con-
tract in Bayou Lafourche at Lockport, La.
   Connely subdivision.-A total of 13,848 cubic yards of material
was dredged by hired labor to complete about 1,500 feet of channel.
   About 850 linear feet of creosoted-timber bulkhead was constructed
under contract.
   Backfilling at the Connely subdivision bulkhead was done by hired
labor and leased plant and consisted of placing approximately 9,000
cubic yards of earth fill behind the bulkhead.
   Bayou Blue to Atchafalaya River.-Under contract 1,724,312 cubic
yards of material were dredged. A total of 5.1 miles of canal was
completed.
   Plaquemine to Morgan City.-Timber was cleared 30 feet back
from the water edge for a distance of 19.7 miles on the east bank
and 17.1 miles on the west bank, and dredging 30,015 cubic yards
of material in easing bends. All work was done by hired labor.
   Public Works funds-Harvey Lock.-Construction o.f work build-
ings and bulkheads around the warehouse yard area along the lower
lock approach under contract was completed.
   Placing 29,466 cubic yards of dry backfill on the east side of the
lock under contract was completed.
   The completion of dry backfill on the east side of the lock and of
backfilling the west side of the lock under contract was started April
20, 1934. At the end of the fiscal year a total of 26,607 cubic yards
of material had been placed.
   The timber guide walls and mooring dolphins in the lower lock
approach under contract was completed June 26, 1934.
   The furnishing and installing of the emergency dam derricks,
stoplogs, and needle dams under contract was completed at the end
of the fiscal year, with the exception of final adjustments to derrick
hoists.
   Miscellaneous small construction was carried on by hired labor
during the year.
   Houmaa     anal bulkhead.-A creosoted timber bulkhead approxi-
mately 220 feet long on the east side of the Houma Canal near
Houma, La., was constructed under contract.
   Plaquemine to Morgan City.-The channel through Chopin Chute,
for about 11/4 miles, was dredged by hired labor to project width
and depth, which involved the excavation of 51,538 cubic yards of
material.
   Maintenance and improvement funds only expended in the follow-
ing sections-Atchafalaya River-Vermilion River section.-Mainte-
nance done by hired labor consisted of dredging 273,653 cubic yards
of material from the 9- by 100-foot project.
   Vermilion River-Mermentau River section.-Maintenance done by
hired labor consisted of dredging 18,923 cubic yards of material from
the 9- by 100-foot channel. The Vermilion Lock was completed
under contract. Miscellaneous work under contract was accomplished
at the lock, consisting of the installation of a voltage regulator, the
         RIVERS AND HARBORS-NEW               ORLEANS, LA.1 DISTRICT             625

excavation of 7,000 cubic yards of material in grading spoil banks,
and construction of office building and three lock-tenders' residences.
A spare-power unit was installed by the lock force. The contractor
started work on the lock chamber guide piles and the steel sheet
pile bulkhead, driving about 100 linear feet of the steel bulkhead.
  Surveys.-Survey work incidental to constructing and maintain-
ing the intracoastal waterway were carried on throughout the year.
A survey party was kept in the field collecting hydraulic data for use
in connection with the operation of Vermilion Lock.
  Regula funds.-The total costs were $996,662.54; $99,229.77 for
maintenance and $897,432.77 for new work under the existing project.
The total expenditures were $1,067,294.58.
  Publio Works funds.-The total costs for new work under the exist-
ing project were $219,419.64, and the total expenditures were $191,-
928.20.
   Condition at end of fiscal year.-The project is substantially com-
pleted.
  Public Works funds.-Houma Canal bulkhead was completed
under contract in 1934.
  Plaquemine-Morgan City alternate route.-Project width and
depth was obtained in the channel through Chopin Chute.
  The controlling depth at mean low Gulf level on June 30, 1934,
was 9 feet from the Mississippi River to the Sabine River via the
Harvey and Plaquemine routes.
  The total costs (regular funds) under the existing project to the
end of the fiscal year were $7,065,563.59, of which $6,898,933.50 was
for new work and $166,630.09 for maintenance. The total expendi-
tures were $7,143,039.02.
  The total costs (Public Works funds) under the existing project
to the end of the fiscal year were $219,419.64 for new work. The
total expenditures were $191,928.20.
  Proposed operations, maintenance, and imiprovement funds.-The
balance unexpended at the end of the fiscal year, including accounts
receivable, $267,065.32, will be applied as follows:
Accounts payable June 30, 1934-_____---- --.-                     _---- $18, 133.47
New work, by contracts in force-Mississippi-Atchafalaya section
  (Harvey route) :
    Harvey Lock:
        Machinery, lock shops, Harvey Lock, work by contract
           (July 1 to Aug. 31, 1934) ---------------          ---        12, 000. 00
        Constructing steel oil barge by contract (July 1 to Aug.
          15, 1934)         ---------------------------------            10, 000. 00
   Vermilion Lock:
        Installing yoltage regulator by contract in July 1934__----          800. 00
        Constructing fender system and extending steel sheet pile
          bulkhead by contract (July 1 to Aug. 9, 1934)----------12, 000. 00
        Grading spoil banks by contract (July 1 to Aug. 12, 1934)_        4, 000. 00,

          Total new work by contract-----------------------               56, 933. 47
New work, by hired labor:
   Mississippi-Atchafalaya section (Harvey route):
       Harvey Lock:
            Engineering and design (July 1 to Aug. 15, 1934)----           3, 131. 85
            Marking waterway by hired labor (Aug. 1 to Oct. 15,
              1934) ----                                                   0, 000. 00
                                                                          1-----------------------------

                  Total for new work         ----------                   70, 065. 32
                                                                          7------
626     REPORT OF CHIEF OF ENGINEERS,                            U. S. ARMY,     1934

Maintenance (by hired labor and Government plant):
    Dredging:
        Mississippi-Atchafalaya section ----------------------      $36, 000. 000
        Atchafalaya-Vermilion section     ------------------------ 36, 000. 00
        Vermilion-Mermentau section__-------___-        __-____-     36, 000. 00
        Mermentau-Calcasieu section.---___      -__--____-____       30, 000.00
        Plaquenine-Morgan City section        _____________________ 31, 000.00
           The above dredging will be done throughout the fiscal
             year as necessary.
    Hydraulic survey hired labor (July 1, 1934, to June 30, 1935)_   10, 000. 00
    Repairs to Flat Lake Dike (July and August 1934)-----------      18, 000. 00,
      Total for maintenance_____----                 __    __
                                                   -----------           _           197, 000. 00

      Total for all work----------------------------------                           267, 065. 32
      New work to be done witlv National Industrial Recovery Act funds

  The balance unexpended at the end of the fiscal year including
accounts receivable, a total of $163,667.72, will be applied as follows
   Accounts payable June 30, 1934 ____-------...                     $28, 087. 36
New work, by contract:
   Mississippi-Atchafalaya section (Harvey route)
      Harvey Lock:
            Emergency dam and derricks (July 1 to Aug. 1, 1934)_       8, 000. 00
       Backfill and terraces by contract (July 1 to Sept. 20,
              1934)---                             -----------------  25, 000. 00
            Grading, fencing, and roads by contract and hired labor
               (July 1, 1934, to Apr. 30, 1935) -------------         12, 000.00
            Lock office, switchboard, electrical work, residences,
              and small buildings (Nov. 1, 1934, to Jan. 31, 1935)_ 25, 000. 00

                     Total new work by contract__-----             ---           -
                                                                             ____-    98, 087. 30

New work (by hired labor and Government plant) :
   Mississippi-Atchafalaya section (Harvey route):
       Dredging channel from Harvey Lock to Station 55 (at in-
         tervals throughout the year) -----------------------    30, 000.00
   Harvey Lock :
       Engineering and design (July 1 to Aug. 15, 1934)---------  3, 000. 00
   (Plaquemine route) :
       Plaquemine waterway:
            Completion of dike in Flat Lake-------------- __     12, 580. 30
            Dredging, easing bends (at intervals throughout the
              year)---------------------------------------       20, 000. 00

                     Total for new work by hired labor              _____-_           65, 580. 36

                                   ---------------------
                     Total for new work-                  163, 667. 72
  The proposed new work will complete the entire project.
  The additional sum of $230,000 can be profitably expended during
the fiscal year 1936 as follows:
Maintenance (by hired labor and Government plant):
   Mississippi-Atchafalaya section----------------------------                           $50, 000
   Plaquemine-Morgan City section-__--__-----                                             70, 000
   Atchafalaya-Vermilion section -40,                                                         000
   Vermilion-Mermentau section ----------         -----                                   40,000
   Mermentau-Calcasieu section__ __-- __------O----------   -                           - 30, 000

      Total-----------------------------------------------230,                               000
  The work will be carried on intermittently throughout the fiscal
year as necessary.
                RIVERS AND HARBORS-NEW ORLEANS, LA., DISTRICT                                                                                       627
                                                   Cost and financial summary
                                        MAINTENANCE AND IMPROVEMENT FUNDS

'Cost    of new work to June 30, 19341_--__-__                                                     -----
                                                                                                 -_____-                         $10, 889, 992. 13
.jCost of maintenance to June 30, 1934 -__                                           -       - ______--               -----                615, 591. 57
      Total cost of permanent work to June 30, 1934_.........    11, 505, 583. 70
Value of plant, materials, etc., on hand June 30, 1934_---------     133, 726. 18
      Net total cost to June 30, 1934_-______-                                                                -__ -- _,,             11, 639, 309. 88
Plus accounts receivable June 30, 1934_    ___-                                                         --
                                                                                                       ___-_____,                          5, 331. 64
       Gross total costs to June 30, 1934__--_--- -- __--_                                                                           11, 644, 641. 52
lMinus accounts payable June 30, 1934_....--     _________                                                                                18, 133. 47
      Net total expenditures ..... _______
                                        -  __---__-__-                                                                               11, 626, 508. 05
TJnexpended balance June 30, 1934___---------------------                                                                                261, 733.68
            Total amount appropriated to June 30, 1934 _____                                                             ___         11, 888, 241. 73

    Fiscal year ending June 30                          1930                    1931                   1932                   1933              1934


Cost of new work---------....                      -. $459, 938. 54 $1, 228, 787. 26 $2,043, 510. 20 1$2,181,324. 10                          $897, 432. 77
Cost of maintenance--...-.....                        -30, 161. 60       22, 027. 58     52, 876. 00   2 25, 851. 69                            99, 229. 77
        Total cost-......--------...------......      429, 776. 94       1, 250, 814.84          2, 095, 386. 20      2, 207,175.
                                                                                                                                79             996, 662. 54
Total expended___.................                    536, 312. 50       1, 226, 354. 41         1, 874, 851. 39       2, 253, 374. 31       1, 067, 294. 58
Allotted_ --------.---.--                 __. _ 3, 010, 000. 00            967, 500. 00          - 667, 949. 21        1,521, 527. 61          666, 917. 36

  1 Decreased $574.71 account sale of laboratory equipment.
  2 Decreased $3,483.07 account error in January 1933 record.

Balance unexpended July 1, 1933--------------------------                                                                                 $662, 110. 90
Amount allotted from War Department Appropria-
tion Act approved Apr. 26, 1934____--_    _______ $195, 000. 00
Amount allotted from War Department Appropria-
tion Act approved July 14, 1932                     85, 000. 00
Amount allotted from War Department Appropria-
tion Act approved Mar. 4, 1933 ----------     ___  452, 500. 00
                                                                                                                                           732, 500. 00
      Amount                  to be accounted for______________________       _ 1, 394, 610. 90
Deductions on                 account of:
   Revocation                  of impounded funds_-----_---         12, 622. 38
   Revocation                  of allotment__- ____-_______        52, 960. 26
                                                                                    65, 582.64

       Net amount to be accounted for-    __------     -____-     1, 329, 028. 26
'Gross amount expended ---           ___   -____-_1, 068, 162.11
Less receipts from sales-------------------------         867. 53
                                                                  1, 067, 294. 58

       Balance unexpended June 30, 1934-----------------------                                                                             261, 733. 68
'Outstanding liabilities June 30, 1934 --------------------                                                                               - 69, 481. 56
     Balance available June 30, 1934____
                                       -         ________--_----    -                                                                      192, 252.12
Accounts receivable June 30, 1934 ___-__ ---...-        __       ___-                                                                 -      5, 331. 64

           Unobligated balance available June 30, 1934                                                      ----------
                                                                                                             _.                            197, 583.76
Amount that can be profitably expended in fiscal year ending
   June 30, 1936, for maintenance 1"-                                -      -    -       -   -     -    -     -   -
                                                                                                                                           230, 000. 00
  'Decreased $574.71 account sale of laboratory equipment.
  2 Decreased $3,483.07 account error in January 1933 records.
  * Exclusive of available funds.
628          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                     1934

                                             PUBLIC WORKS FUNDS

Cost of new work to June 30, 1934------------------------- $219, 419. 64
Cost of maintenance to June 30, 1934 -------------------                                  ------------
      Total cost of permanent work to June 30, 1934----------- 219, 419. 64
Plus accounts receivable June 30, 1934 __________________----595. 92

     Gross total costs to June 30, 1934_---_________---                                         220, 015. 56
Minus accounts payable June 30, 1934 _______----- -------                                        28, 087. 36
     Net total expenditures-------------------------------191, 928. 20
Unexpended balance June 30, 1934------------------------    163, 071. 80
         Total amount appropriated to June 30, 1934__--------------                             355, 000. 00

         Fiscal year ending June 30                1930    1931          1932            1933          1934

Cost of new work...... _______________
              of new
         Costwork-         -------- ------------ ------------ ------------           ------------   $29 419.
                                                                                                    $219, 1.6 64
Cost of maintenance.....______............
Total expended........-----------------------------------------------------------191,                    928. 20
Allotted---- --------------                                  ----                                    355, 000. 00


Amount allotted from National Industrial Recovery Act approved
  June 16, 1933        ---------------------------------------- $440, 000. 00
Deductions on account of revocation of allotment ______-___-
                                                           -      85, 000. 00
      Net amount to be accounted for----------------------                                      355, 000. 00
Gross amount expended                                      $191, 941.00
Less receipts from sales--- -------- __            -______-- 12. 80
                                                                                                191, 928. 20

      Balance unexpended June 30, 1934 ---- ____                     -----                      163, 071. 80
Outstanding liabilities June 30, 1934_6___      -                         __               _      069,
                                                                                                     243. 04
     Balance available June 30, 1934_ ...... __                     __-------__                  93, 828. 76
Accounts receivable June 30, 1934__---------                        -__              ___--_          595. 92

         Unobligated balance available June 30, 1934_ .... ____-                           _     94, 424. 68
CONSOLIDATED         COST AND FINANCIAL SUMMARY FOR LOUISIANA-TEXAS                             WATERWAY

Cost of new work to, June 30, 1934___________________________ $11, 109, 411. 77
Cost of maintenance to June 30', 1934------------------------    2 615, 591. 57
      Total cost of permanent work to June 30, 1934----------                              11, 725, 003. 34
Value of plant, materials, etc., on hand June 30, 1934 _______--                               133, 726. 18
      Net total cost to June 30, 1934_____ ___ -   -                 -      --
                                                                           __          _-11, 858, 729. 52
Plus accounts receivable June 30, 1934_ .....______                       __-_                 5, 927. 56

      Gross total costs to June 30, 1934___------------____                      -      - 11, 864, 657. 08
Minus accounts payable June 30, 1934 _______--   -----                     __           ---    46, 220. 83

     Net total expenditures--     ___- _______--------                                     11,818, 436. 25
Unexpended balance June 30, 1934___ ___--- ----                                __-         -424, 805.48

         Total amount appropriated to June 30, 1934-----------                             12, 243, 241. 73

  1 Decreased $574.71 account sale of laboratory equipment.
  " Decreased $3,483.07 account error in January 1933 records.
               RIVERS AND .HARBORS-NEW                                   ORLEANS,          LA., DISTRICT                     629

    Fiscal year ending June 30                  1930              1931              1932              1933               1934


Cost of new work-__---....--    .            $459, 938. 54 $1, 228, 787. 26 $2, 043, 510. 20 1$2,181,324. 10         $1, 116, 852. 41
Cost of maintenance............              -30, 161. 60       22, 027. 58      52, 876. 00    2 25, 851. 69             99, 229. 77
        Total cost_---------------            4z9, 776. 94   1, 250, 814. 84   2, 095, 386. 20   2, 207, 175. 79      1, 216, 082. 18

Total expended............----------------    536, 312. 50   1, 226, 354.41    1, 874, 851. 39   2, 253, 374. 31      1, 259, 222. 78

Allotted _-.....--------                 - 3, 010, 000. 01     967, 500. 00    -667, 949. 21     1,521, 527. 61       1, 021, 917. 36

  1Decreased $574.71 account sale of laboratory equipment.
  2Decreased $3,483.07 account error in January 1933 records.

Balance unexpended July 1, 1933----------     -------- --------                                                    $662, 110. 90
Amount allotted from War Department Appropria-
tion Act approved Apr. 26, 1934_----__-------     $195, 000. 00
Amount allotted from War Department Appropria-
  tion Act approved July 14, 1932-------             85, 000. 00
Amount allotted from War Department Appropria-
  tion Act approved Mar. 4, 1933----------------452, 500. 00
Amount allotted from National Industrial Recovery
Act approved June 16, 1933----_---------           440, 000. 00
                                                                                                              1, 172, 500. 00

     Amount to be accounted for --------------------              1, 834. 610. 90
Deductions on account of-
   Revocation of impounded funds---------------12, 622. 38
   Revocation of allotment----------------           137, 960. 26
                                                                     150, 582. 64

      Net amount to be accounted for-__-- ----- ____       ___-    1, 684, 028. 26
Gross amount expended- ...---------------          1, 260, 103. 11
Less receipts from sales----------------------             880. 33
                                                                   1,259, 222. 78

      Balance unexpended June 30, 1934____________---
                                                    -424,                                                               805. 48
Outstanding liabilities June 30, 1934----------------                                                              138, 724. 60

     Balance available June 30, 1934----------------                                                               286, 080. 88
Accounts receivable June 30, 1934----------------------------                                                        5, 927. 56

           Unobligated balance available June 30, 1934_ .___---____                                                292, 008. 44

Amount that can be profitably expended in fiscal year ending
June 30, 1936, for maintenance 1      -----------                                                                 230, 000. 00

       18. OPERATING AND CARE OF HARVEY CANALS AND LOCK, LA.

   The improvement for which report is made under this caption
forms part of the project for the Louisiana and Texas Intracoastal
Waterway from the Mississippi River at or near New Orleans, La.,
to Corpus Christi, Tex. (New Orleans-Sabine River section). See
pages 620 to 629 of this report. The lock was placed in operating
status March 13, 1934, and has been operated and maintained under
the permanent indefinite appropriation since that date.
   Operations and results during fiscal year.--The lock, canals, and
grounds were maintained in good condition and all necessary rou-
tine work thereon performed. The total costs were $28,469.11, and
the total expenditures were $23,679.80.
   1
       Exclusive of available funds.
630      :REPORT OF       'CHIEF          OF ENGINEERS, U. S. ARMY,                              1934

  Condition at end of fiscal year.-The controlling depth at the end
of the fiscal year in the canal was 9 feet and in the lock 12 feet at
mean low Gulf level. The total costs to the end of the fiscal year
were $317,235.05. The total expenditures were $321,576.07.
  Proposed operations.-The lock and grounds will be operated and
maintained under allotments from appropriations made available for
such purposes.
                                Cost and financial summary

Cost of maintenance to June 30, 1934----------------------- $317, 235. 05
Value of plant, materials, etc., on hand June 30, 1934------------- 8, 472. 11

      Net total cost to June 30, 1934------------------------                                           325, 707. 16
Plus accounts receivable June 30, 1934-----------                                                              047. 75
                                                                                                          1,1-----------

     Gross total costs to June 30, 1934----------------------                                           326, 754. 91
Minus accounts payable June 30, 1934---------------------------                                           5, 178. 84

     Net total expenditures------------------                                ------------               321, 576. 07
Unexpended balance June 30, 1934-------------                                                             9, 683. 38

       Total amount appropriated to June 30, 1934--------------331, 259. 45

       Fiscal year ending June 30                 1930           1931            1932          1933            1934

Cost of new work-----------------                 --------------------------------
Cost of maintenance-_----------------$24, 829. 84             $25, 961.67     $23, 225.48 '$23,723.49        $28, 469. 11
Total expended.   --_,_----_,       .-- .-- _   24, 703. 88    31, 896. 14     21, 758. 87   25, 827. 03      23, 679. 80

Allotted------------------------                23, 500. 00    26,000.00       30, 000.00    18, 075. 40      29, 684. 05

1Increased $350 account plant rental adjustment.
Balance unexpended July 1, 1933--------------------$3,              679. 13
Amount allotted from permanent indefinite appropriation, sec. 6,
  River and Harbor Act, Mar. 3, 1909--------------------------- 31, 400. 00
      Amount to be accounted for------------------------                                                   35, 079. 13
Deductions on account of revocation of impounded funds---------                                             1, 715. 95
      Net amount to be accounted for-------------------------    33, 363 18
Gross amount expended-------------------------- $23, 688. 72
Less receipts from sales----------------   ---------       8. 92
                                                                 23, 679. 80
      Balance unexpended June 30, 1934 -----------------------                                               , 83. 38
Outstanding liabilities June 30, 1934---------------------------                                            5, 872. 22
      Balance available June 30, 1934------------------------                                               3, 811. 16
Accounts receivable June 30, 1934---------------------------------                                          1, 047. 75
Unobligated balance available June 30, 1934--------------------- 4, 858. 91
Amount allotted for fiscal year 1935--------------------------46, 000. 00

       Balance available for fiscal year 1935--------------------50, 858. 91

  1 Increased $350 account plant rental adjustment.
         RIVERS AND      HARBORS-NEW         ORLEANS, LA.,      DISTRICT       631

          19. OPERATING AND CARE OF HANSON CANAL, LA.

  Location.-Hanson Canal leaves the right bank of Bayou Teche
below the town of Franklin; it is 4.1 miles long. Its westerly end is
about 21/2 miles from the Louisiana and Texas Intracoastal Water-
way, with which it connects through Bayou Portage. It connects
with Bayou Teche by Hanson Lock. (See U. S. Coast and Geodetic
Survey Chart No. 1116.)
  Existing project.-This provides for the purchase of the Hanson
Canal at a cost not to exceed $65,000, and was authorized by the
River and Harbor Act of July 25, 1912.
                                  Hanson Lock

Miles from Franklin, La-------------         1. 5.
Miles from Bayou Teche--------__-_ 0.
Width of. chamber- -____          -___    _- 26. 5 feet.
Length available for full width              937 feet.
                                         .-------
Lift_----------------------------            0-5 feet.
Depth on miter sill at low water-      .-    5 feet.
Character of foundation-------------         Timber piles.
Kind of dam----------------------            None.
Type of construction----------------Concrete buttresses, wooden mitering
                                                gates, earth-loCk chamber.
Percentage of completion------------         Completed 1907.
Cost---------------------------              $65,000, including 4.1 miles of canal.
   Operations and results during fiscal year.--The lock, canal, struc-
tures, and grounds were maintained in good condition and all neces-
sary routine and maintenance work thereon performed. The total
costs were $3,323.87 all for maintenance, and the total expenditures
were $3,270.77.
   Condition at end of fiscal year.-This property was purchased by
the United States in 1923 at a cost of $65,000. The United States
owns a strip of land 300 feet wide between parallel lines running
from Bayou Teche to Bayou Portage, a distance of 4.1 miles and
containing about 148 acres. The controlling depths on June 30,
1934, were 5 feet at mean low Gulf in the canal and 4 feet in the
lock chamber. The total costs to the end of the fiscal year were
$39,579.91, all for maintenance. The total expenditures were
$39,479.64.
  Proposed operations.--The lock and grounds will be operated and
maintained under allotments from appropriations made available
for such purposes.
                          Cost and financial sunmary
Cost of maintenance to June 30, 1934-------------------------           $39, 579. 91
Minus accounts payable June 30, 1934-----------------__----------            100. 27
     Net total expenditures-----------------------------39, 479. 64
Unexpended balance June 30, 1934------------------------ --- 1, 875. 42

       Total amount appropriated to June 30, 1934_ ... __----         -- 41, 355. 06
632            REPORT            OF CHIEF OF ENGINEERS,                            U.   S. ARMYY            1934

           Fiscal year ending June 30                          1930         1931          1932            1933           1934

Cost of new work..------------------------
Cost of maintenance .......-------------------               $3, 585.48   $2, 882. 65   $3, 292. 86     $3, 462.19      $3, 323.87
Total expended.....................-----------------------   3, 616. 89    2, 875.76     3, 276.76       3, 654. 95      3, 270. 77
Allotted....... -----------------------------
                          .                                   3,800. 00    3, 500. 00    3, 500. 00      2, 719.88       4, 235.18


Balance unexpended July 1, 1933------------------------------     $911.01
Amount allotted from permanent indefinite appropriation, sec. 6,
  River and Harbor Act, Mar. 3, 1909---------  -------- ___      4, 400. 00
      Amount to be accounted for ____- __     _____--___--___    5, 311. 01
Deductions on account of revocation of impounded funds----------- 164. 82

      Net amount to be accounted for___________-____                                                           5, 146. 19
Gross amount expended_        ______    ___   _- ___                                                  ____-----3, 270. 77

      Balance unexpended June 30, 1934_-__-----                                                       __---1,           875.42
Outstanding liabilities June 30, 1934-__ --------------                                                                 127. 88

    Balance available June 30, 1934 _....______.      __..    .                                                       1, 747. 54
Amount allotted for fiscal year 1935------------------------------                                                    4, 000. 00
           Balance available for fiscal year 1935 ___--______                                             ___-5,        747. 54

      20. OPERATING AND CARE OF SCHOONER                                                  BAYOU LOCK, LA.

  Location.-Schooner Bayou Lock is located in Vermilion Parish,
La., on the 5 by 40 intracoastal waterway between Vermilion Bay
and the Mermentau River. (See U. S. Coast and Geodetic Survey
Chart No. 1116.)
  Existing project.-This provides for the construction of the
Schooner Bayou Lock and Dam and was authorized by the River and
Harbor Act of March 2, 1907 (H. Doc. No. 640, 59th Cong., 2d sess.).
                                                    Lchooner Bayou Lock
Miles from Abbeville, La           --- LLLLLL.                            32.
Miles from Vermilion River------------                                    9.
Width of chamber--------------------                                      36 feet.
Length available for full width--------.                                  300 feet.
Lift ------  .------------------------                                    0-3 feet.
Depth on miter sill at low water---------                                 8 feet.
Character of foundation_................                                  Timber piles.
Kind of dam_ ____-   _         ---Timber.
Type of construction-----------------                                     Concrete buttresses, wooden gates
                                                                            turning on horizontal hinges at
                                                                            bottom, earth lock chamber.
Percentage of completion -------------                                    Lock completed 1913; dam com-
                                                                            pleted 1914.
Cost------------------                                                    $40,018.10 for lock and $8,500 for
                                                                            dam.
  Local cooperation.-The project provided that rights-of-way be
furnished free of cost to the United States. The necessary land for
the lock and dam was deeded to the United States and accepted
March 13, 1909.
  Terminal facilities.-None.
                 RIVERS AND HARBORS-NEW ORLEANS, LA., DISTRICT                                                               633
   Operations and results during fiscal year.-The lock, dam, struc-
tures, and grounds were maintained in good condition and all neces-
sary routine and maintenance work thereon performed. The total
,costs were $6,600.25, all for maintenance. The total expenditures
were $6,540.78.
   Condition at end of fiscal year.-The lock and dam were completed
in 1913 and 1914, respectively, at a cost of $40,018.10 for the lock and
$8,500 for the dam; both are in good condition. The United States
reservation comprises 2 acres. The controlling depth on June 30,
1934, was, 8 feet at mean Gulf level. The total costs were $109,162.98,
all for maintenance. The total expenditures were $108,742.01.
   Proposedopterations.-Thelock, dam, and grounds will be operated
and maintained under allotments from appropriations made available
for such purposes.
                                                Cost and finaneial summary
Cost of maintenance to June 30, 1934---------------------------     $109, 162. 98
Value of plant, materials, etc., on hand June 30, 1934 ------------    -174. 83

      Net total cost to June 30, 1934--------------- -------     108, 988.15
Plus accounts receivable June 30, 1934---------------------------      21. 66

      Gross total costs to June 30, 1934--------------------- 109, 009. 81
Minus accounts, payable June 30, 1934--------------------------    267. 80

      Net total expenditures-------------------------------108, 742. 01
Unexpended balance June 30, 1934-----------------------------   701.56
            Total amount appropriated to June 30, 1934- -------------                                              109, 443. 57

            Fiscal year ending June 30                          1930          1931           1932          1933           1934

Cost of new work................---------.                                                ---------
Cost of maintenance--........----.............-------------   $4, 404. 88   $5, 018. 52    $5, 217. 86   $5, 198. 26     $6, 600. 25
'Total expended-.--------------------------                    5, 191. 47   5, 027. 45      4, 662. 78    5,083. 35       6, 540. 78
Allotted....-----------..........---------- ----------         5, 000. 00   5, 500. 00      5, 000. 00    5, 574. 59      5, 138. 52


Balance unexpended July 1, 1933-----------------------------     $2, 103. 82
Amount allotted from permanent indefinite appropriation, sec. 6,
  River and Harbor Act, Mar. 3, 1909 --  ----------------------   5, 500. 00

     Amount to be accounted for      ----------------------------- 7, 603.82
Deductions on account of revocation of impounded funds-----------     361.48

      Net amount to be accounted for---   ------------- ---------- 7, 242. 34
Gross amount expended      ---------------------------- $6, 550. 65
Less receipts from sales--                               --    . 87
                                                              9-------------------------
                                                                       6, 540. 78
      Balance unexpended June 30, 1934------------------------                                                           701.56
Outstanding liabilities June 30, 1934-----------------------------                                                       297.37
     Balance available June 30, 1934-...--------                                                                         404. 19
Accounts receivable June 30, 1934---------------------- ---------                                                         21. 66

     Unobligated balance available June 30, 1934------------------425. 85
Amount allotted for fiscal year 1935--------------------          8, 700. 00

            Balance available for fiscal year 1935__                                                                     125. 85
                                                                                                                       9,----------
634         REPORT        OF CHIEF OF ENGINEERS,                         U.     S. ARMY,            1934

            21. OPERATING AND CARE OF VERMILION LOCK, LA.

   The improvement for which report is made under this caption
forms part of the project for the Louisiana and Texas Intracoastal
Waterway from the Mississippi River at or near New Orleans, La.,
to Corpus Christi, Tex. (New Orleans-Sabine River section). See
pages 620 to 629 of this report, where general information may be-
found. The completed lock has been operated and maintained under
the permanent indefinite appropriation since October 13, 1933.
    Operations and results during fiscal year.-The lock, sluiceway,.
structures, and grounds were maintained in good condition and all
necessary routine and maintenance work thereon performed. The
total costs were $11,472.76, all for maintenance. The total expendi-
tures were $10,906.24.
    Condition at end of fiscal year.-Operation of the lock and spill-
way was begun October 13, 1933. Some items of construction are,
not yet completed. The United States has an easement deed to a
strip of land 300 feet wide along the intracoastal waterway. The,
controlling depth on June 30, 1934, was 12 feet at mean low Gulf
level. The total costs were $11,472.76. The total expenditures were
$10,906.24.
   Proposed -operations.-Thelock, sluiceway, and grounds will be:
operated and maintained under allotments from appropriations made.
available for such purposes.
                                      Cost and financial summary

Cost of maintenance to June 30, 1934_------___________     ____ $11, 472. 76
Minus accounts payable June 30, 1934____-------__-__--_____      - 566. 52'

     Net total expenditures-----_------     ______                                          ____            10, 906. 24
Unexpended balance June 30, 1934_ -__-___-____-___                                                 __..      1, 829. 72:
         Total amount appropriated to June 30, 1934- -- __________                                          12, 735. 96

         Fiscal year ending June 30                  1930         1931             1932            1933         1934


Cost of new work.......................... ...........                                                                 .
Cost of maintenance---------------
                   ..........          ----------............        ------------------------                 $11, 472. 76
Total expended..-----------------........---------------------------------10,906. 24
              ----------------------------------------------------------
Allotted.....---        .-                                                    12, 735. 96

Amount allotted from permanent indefinite appropriation, sec. 6,
River and Harbor Act, Mar. 3, 1909__--   ______-____________    $13, 000. 00
Deductions on account of revocation of impounded funds                264. 04               --------
      Net amount to be accounted for-----------------------12,                                                  735. 96
Gross amount expended ----------------------        $10, 932. 84
Less receipts from sales__-------------------------       26. 60
                                                                                                            S10, 906.   24

      Balance unexpended June 30, 1934_______------       ---------                                          1, 829. 72
Outstanding liabilities June 30, 1934_--------------------_                                                  1, 319. 20

    Balance available June 30, 1934_...                         _____-__--                      -______--       510. 52
Amount allotted for fiscal year 1935                             --------------                             17, 000. 00

          Balance available for fiscal year 1935--------------------                                        17, 510. 52
        RIVERS AND hIARBORS-NEW        ORLEANS,   LA.,   DISTRICT   635
         22. PETIT ANSE, TIGRE, AND CARLIN BAYOUS, LA.

   Location. Bayou Tigre is a tributary of Bayou Carlin; Bayou
,Carlin is a tributary of Bayou Petit Anse. Bayou Petit Anrise has its
.source in Iberia Parish, about 5 miles northwest of New Iberia. It
flows in a southwesterly direction for about 15 miles to its intersection
with the Intracoastal Waterway, thence for a distance of about 3
miles to Vermilion Bay. Bayou Tigre has its source in Vermilion
Parish about 6 miles northeast of Abbeville and flows in a southerly
direction for about 7 miles to its junction with Bayou Carlin. Bayou
Carlin has. its..source in Lake Peigneur in Vermilion Parish and
flows in a southerly direction about 7.5 miles to its confluence with
Bayou Petit Anse at a point about 2.3 miles above the Intracoastal
Waterway. (See U. S. Coast and Geodetic Survey Chart No. 1277.)
    Existing project.-No, project has been authorized by Congress.
The dredging of a channel in Bayou Petit Anse, 9 feet deep and 60
feet wide from the Intracoastal Waterway to a point 3.2 miles
upstream, thence 5 feet deep and 40 feet wide to the highway bridge
at the upper end of Avery Island about 6.1 miles; and a channel
.5  feet deep over a-bottom width of 40 feet in Bayou Carlin from
Bayou Petit Anse to Lake Peigneur about 7.6 miles, as recommended
by the Chief of Engineers in House Document No. 225, Seventy-
second Congress, first session, at an estimated cost of $38,500, with
$1,200 annually for maintenance, has been included in the Public
Works program under the National Industrial Recovery Act. The
latest published, map is printed in the above-mentioned document.
    Recomm~ended modifications,of project.-Included in Public Works
program.
    Local cooperation.-The work included in the Public Works pro-
gram is subject to the condition that local interests furnish all rights-
of-way and suitable areas for disposal of dredged material, and shall
construct a suitable public terminal at the head of Avery Island and
reconstruct all highway and railroad bridges to provide suitable
clearances, all without cost to the United States.
    Terminal facilities.-Existing terminal facilities are confined to
small private docks and cane hoists. Terminal facilities are further
described in House Document No. 225, Seventy-second Congress, first
session.
    Operations and results during fiscalyear.-No work was done with
regular funds. Operations conducted during the fiscal year on work
authorized by the Federal Emergency Administration of Public
Works consisted entirely of securing rights-of-way spoil disposal
areas. Due to the fact that requirements for local cooperation have
not yet been met, no work has been done. The total costs and ex-
penditures were $135.96, all for new work.
    Condition at end of fiscal year.-The work of obtaining rights-of-
way spoil disposal areas is still in progress. Dredging has not yet
begun. The total costs and expenditures (Public Works funds) were
 $135.96, all for new work.
    Proposed operations.-Thebalance of the allotment from National
Industrial Recovery Act funds unexpended at the end of the fiscal
year ($38,364.04) will be applied to new work dredging, under con-
tract, in Petit Anse, Tigre, and Carlin Bayous during the period
January 1 to March 31, 1935.
636         REPORT         OF CHIEF                OF ENGINEERS, U.             S. ARMY,         1934


   No additional funds can be expended during the fiscal year 1936, as:
it is not believed that maintenance dredging will be required during
that year.
                                          Cost and financial summary

Cost of new work to June 30, 1934-----------------------------   $135. 96
Cost of maintenance to June 30, 1934----  -----------------------------

         Total cost of permanent work to June 30, 1934_-__-
                                                         ----                                    --          135. 96

Net total expenditures       --------------        -------------     135. 96
Unexpended balance June 30, 1934-----    ---------------- ------ 38, 364. 04

         Total amount appropriated to June 30, 1934--_______--                                 ___        38, 500. 00

         Fiscal year ending June 30                     1930         1931         1932         1933           1934

Cost of new work.....--------.............-----------..---------... ........-------------------------------- $135. 96
Cost of maintenance-- .             --               ---------------------------------------------------
Total expended                     --
                               ........   ------                              -----------
                                                    ---------------------- ..-------        -----------         135.96

Allotted--__----------- ------                 ------------------------------            ------------        38, 500.00?


Amount allotted from National Industrial Recovery Act approved
June 16, 1933--------------------                                                                    $38, 500. 00
Gross amount expended --------------------------------------                                               135. 96

      Balance unexpended June 30, 1934----------------------- 38, 364. 04
Outstanding liabilities June 30, 1934-----------------------------     25

         Balance available June 30, 1934-------------------                                               38, 363. 79

                                    23. BAYOU VERMILION, LA.

   Location.-Bayou Vermilion, also called Vermilion River, is
formed by the junction of Bayous Fusilier and Bourbeau, west of
Arnaudville, La., and flows in a southwesterly direction to the west-
ern end of Vermilion Bay. (See U. S. Coast and Geodetic Survey
Chart No. 1116.)
   Previous projects.-Adopted by act of June 14, 1880. The cost
and expenditures were $9,900. For further details see page 762,
Annual Report for 1914.
   Existing project.-This provides for a channel 51/2 feet deep (no
width specified) at mean low Gulf from Vermilion Bay to the South-
ern Pacific bridge at Lafayette, La., a distance of 51 miles, to be
obtained by dredging and removing obstructions. Under ordinary
conditions the mean range of tide at mouth is 10 inches and the ex-
treme 14 inches. The variation of water surface, near the mouth due
to hurricanes, and in the upper reaches due to floods, is from 8 to 10
feet. The estimated cost of new work, adopted in 1892, exclusive of
amount expended on previous project, was $25,000. The latest (1928)
approved estimate for annual cost of maintenance is $2,000.
   The existing project was adopted by the River and Harbor Act of
July 13, 1892 (H. Ex. Doc. No. 273, 51st Cong., 2d sess.). The latest
published map is printed opposite page 2549 of the Annual Report
for 1917.
           RIVERS AND HARBORS-NEW                             ORLEANS,          LA., DISTRICT                 637

  Terminal facilities.-At Bancker, Rosehill, Abbeville, and Pinhook
Bridge there are ordinary wharves. At Abbeville there is a public
wharf without charge, and a private one owned by the Southern
Pacific Railroad, with conveyors for transferring freight from wharf
to top of bank. Along the stream there are several derricks for load-
ing cane on barges. The facilities are considered adequate for exist-
ing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1896. The controlling depths on June 30, 1934, were as
follows: Over the bar at mouth 3 to 4 feet below mean low Gulf;
mouth to Abbeville, 11 feet; Abbeville to Milton, 5 feet; Milton to
Pinhook Bridge, 3 feet, mean low water, available throughout the
year. The head of navigation is at Pinhook Bridge (mile 49) from
the mouth, The channel is in fair condition from mouth to Abbeville
and poor above Abbeville. The total costs and expenditures have
been $126,133.54, of which $25,000 was for new work and $101,133.54
for maintenance.
  Propiosed operations.-The unexpended balance, $50,000, will be
applied to maintenance operation of one United States dredge dur-
ing the period September 1, 1934, to April 30, 1935.
   This work will provide a channel which will be adequate for exist-
ing commerce and no additional funds can be profitably expended
during the fiscal year 1936.
                                    Cost and financial summary

Cost of new work to June 30, 1934---------------------------                                           $34, 900. 00
Cost of maintenance to June 30, 1934__-------------------------                                        101, 133. 54
        Total cost of permanent work to June 30, 1934___,-..-. . 136, 033. 54

Net total expenditures----------------------------------                                               136, 033. 54
Unexpended balance June 30, 1934--------------__----------                                              50, 000. 00
        Total amount appropriated to June 30, 1934__----------                                         186, 033. 54

        Fiscal year ending June 30               1930             1931         1932             1933        1934


Cost of new work.....
Cost of maintenance- .-------- _____.
                                .     ..       $1, 872. 78         $13. 27   $1, 067. 49
Total expended----............___          .______
                                                 1, 872. 78   .     11. 64    1, 069. 12
Allotted...............-------------------.......3, 000. 00-------------46.           46 -----.----       $50, 000.00


Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934---------------------------------------------------- $50, 000
        Balance unexpended June 30, 1934 _________-________-50000
                                                       .
    24. MERMENTAU              RIVER, BAYOU NEZPIQUE, AND BAYOU DES
                                      CANNES, LA.

   Location.-Mermentau River is formed by the junction of Bayous
des Cannes and Nezpique, 2.25 miles above Mermentau, La., and
flowing in a southwesterly direction empties into the Gulf of Mexico.
(See U. S. Coast and Geodetic Survey Chart No. 1116.)
638    'REPORT OF' CHIEF     OF ENGINEERS,    U.   S.   ARMY,   1934

   Bayou Nezpique rises in Evangeline Parish, flows in a southerly
direction, and empties into the Mermentau River.
   Bayou des Cannes rises in Evangeline Parish, flows in a south-
southwesterly direction, and empties into the Mermentau River.
   SExsting project.-This provides for the removal of obstructions
to navigation to secure the natural channel throughout the entire
Mermentau River, a distance of 71.5 miles, and through Bayou Nez-
pique from its mouth to 25 miles above, and Bayou des Cannes from
its mouth to Evangeline Bridge (mile 8.5) ;for improving the chan-
nel in Lower Mud Lake by constructing a brush dam to concentrate
the action of the current and by dredging; and for removing a
portion of the wrecked dam 7 miles above the mouth.
   Supplementing the work authorized by Congress, the dredging of
a channel 9 feet deep over a bottom width of 100 feet from the intra-
coastal waterway to the junction of Bayous des Cannes and Nezpique,
as recommended by the Chief of Engineers in Rivers and Harbors
Committee Document No. 36, Seventy-second Congress, first session,
at an estimated cost of $30,000, with $1,200 annually for maintenance,
was included in the Public Works program under the National
Industrial Recovery Act.
   Under ordinary conditions the mean range of tide on the Mer-
mentau River near the mouth is 10 inches and near the head about 3
inches, the extreme range being 14 inches and about 5 inches, respec-
tively. The variation of the water surface near the mouth may be
as much as 7 or 8 feet, due to hurricanes on the Gulf, and near the
head from 8 to 12 feet due to freshets. On Bayou Nezpique, under
ordinary conditions, the range of tide is about 3 inches at the mouth
and nothing at the head. On.Bayou des :Cannes, under ordinary con-
ditions, the range of tide is about 3 inches at the mouth and nothing
at the head. '
   The estimate of cost for new work, made in 1892, was $23,615; and
that for the removal-of the dam, made in 1916, $1,500. The latest
 (1928) approved estimate for annual cost of maintenance is $1,000.
   The existing project was authorized by the following river and
harbor acts: The act of July 13, 1892, provided for the general proj-
ect (Annual Report for 1891, p. 1862) ; the act of July 27, 1916, pro-
vided for the removal of a portion of the wrecked dam near the
mouth: (H. -Doc. No. 1232, 64th Cong., 1st sess.).; and the act of
March 2, 1919, provided for the improvement of Bayou des Cannes
:(H, Doc. No. 1398, 65th Cong., 3d sess.). The latest published map
is printed in Rivers and Harbors Committee Document No. 36,
Seventy-second Congress, first session.
   Recommended modifications of project.-Included in Public Works
program.
   Local cooperation.-The work is subject to the condition that local
interests shall furnish, free of cost to the United States, all rights-of-
way and suitable areas for the disposal of dredged material during
initial construction and for future maintenance as and when needed.
   Terminal facilities.-There are several private wharves and ware-
houses at Grand Chenier. These are small, ordinary wharves.
There is a well-constructed public wharf at Lae Arthur, La., with-
but charge. At Mermentau, La., the Southern Pacific Railroad owns
          RIVERS AND            HARBORS-NEW       ORLEANS,   LA.,   DISTRICT    639
a long wharf, with a spur running to the wharf. There is another
small landing and warehouse at this place without charge. There
is a large rice-storage warehouse on Bayou Nezpique. On Bayous
des Cannes and Nezpique there are a few private landing places and
small wharves along the route, which are sufficient to meet the pres-
ent demand of commerce and are open without charge. The facili-
ties are considered adequate for the existing commerce.
    Operations and results during fiscal year.-There were no opera-
tions and no expenditures on the existing project. Work authorized
by the Federal Emergency Administration of Public Works: The
dredging of the 9- by 100-foot channel was begun under contract on
June 18, 1934; at the end of the fiscal year 89,365 cubic yards of
material had been removed. The erection by hired labor of markers
to locate the channel now being dredged was begun June 6, 1934,
and the work is 60 percent completed. The total costs were $2,670.30,
all for new work. The total expenditures were $1,153.63, from
Public Works funds.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1917. Dredging of the 9- by 100-foot channel authorized
by the Public Works Administration is 40 percent completed, 89,365
cubic yards of material have been removed, leaving 135,644 cubic
yards yet to be dredged. The channel markers are about 60 percent
completed.
    Channel conditions are .food in Mermentau River, Bayou Nezpique,
mile 0 to 22, and fair in Bayou Des Cannes, mile 0 to 8.5.
    Under the existing project the costs and expenditures were
$65,627.96, of which $27,580.35 was for nw work and $38,047.61 for
maintenance.
    The cost of operations authorized under the Public Works Admin-
istration were $2,670.30, all for new work, and the expenditures
$1,153.63. Total costs, all funds, have been $68,298.26, of which
$30,250.65 was for new work and $38,047.61 for maintenance. The
total expenditures have been $66,781.59.
   Proposed operations.-The unexpended balance from regular ap-
propriations, $15,000, will be applied to maintenance operations of
one United States bucket dredge removing shoals from Mud Lake
during the month from March 1935 and one United States snag boat
removing obstructions from Bayou Des Cannes during the period
January 1, 1935, to February 28, 1935.
   The balance of the allotment from National Industrial Recovery
Act funds unexpended at the end of the fiscal year, $28,846.37, will
be applied as follows:
Accounts payable June 30, 1934-------------------------___  --------   $1,516. 67
New work dredging under contract in Lake Arthur (on the Mer-
  mentau River) to provide a 9 by 100 foot channel from the intra-
  coastal waterway to the junction of Bayous Des Cannes and
  Nezpique during the period July 1, 1934, to Sept. 30, 1934---------- 27,329. 70

      Total------------------------------------                           28,846. 37
  No additional funds can be profitably expended during the fiscal
year 1936.
      91536-ENG 1934--41
640           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                                1934

                                       Cost and financial summary
                              MAINTENANCE             AND IMPROVEMENT                  FUNDS

Cost of new work to June 30, 1934                                                                                               $27, 580. 35
Cost of maintenance to June 30, 1934_---                                         ____--___                                       38, 047.61
            Total cost of permanent work to June 30, 1934__________-
                                                           .65,                                                                       627. 96

Net total expenditures_6---------- ---------------------------                                                                    5, 627. 96
Unexpended balance June 30, 1934_     ___      _______---                                                                        15, 000.00
            Total amount appropriated to June 30, 1934-_.-                               ________-                                80, 627. 96

            Fiscal year ending June 30                  1930          1931                 1932                     1933               1934


Cost of new work .---------------..---        ..-----------
Cost of maintenance__------------------
                                   $15, 000. 00 $3, 994. 03                       -

Total expended.--------------------------             15, 000. 00    3, 994. 03       ------------............-   -----.......
Allotted ---------------------------------            ------------   4, 000. 00            -$5. 97 ------------                     $15. 000. 00


Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934     -----------------------------------------   $15, 000. 00
Balance unexpended June 30, 1934_____________________________   15,000.00
                                                  PUBLIC WORKS FUNDS

Cost of new work to June 30, 1934_______________________________                                                                  $2,670.30
Cost of maintenance to June 30 1934      _________

      Total cost of permanent work to June 30, 1934____________                                                                    2,. 670.30
Minus accounts payable June 30, 1934____________________________                                                                   1, 516.67

            Net total expenditures_____________________                                                           __               1, 153.63
Unexpended balance June 30, 1934                        ----------------------------                                              28, 846. 37
            Total amount appropriated to June 30, 1934_________________                                                          30, 000. 00

        Fiscal year ending June 30                      1930          1931                 1932                    1933               1934


Cost of new work.               ---------------                                                                                      $2, 670. 30
Cost of maintenance.--

Total expended_                                                                                                                       1, 153. 63

Allotted.                                -                             -                                   -0,                           000. 00
                                                                                                                                     3--------------


Amount allotted from National Industrial Recovery Act approved
June 16, 1933---------------------------------                $30, 000.00
Gross amount expended---------------                                                                                               1, 153. 63

      Balance unexpended June 30, 1934                                                                             ___           28, 846. 37
Outstanding liabilities June 30, 1934_______________________--                                               -                   27, 497. 19
            Balance available June 30, 1934_________________________                                                               1, 349. 18
      CONSOLIDATED        COST AND           FINANCIAL      SUMMARY FOR               MERMENTAU                       RIVER,        LA.

Cost of new work to June 30, 1934-----------------------------$30,     250. 65
Cost of maintenance to June 30, 1934        -----------            38, 047. 61

     Total cost of permanent work to June 30, 1934 .....                                                      -------             68, 298. 26
Minus accounts payable June 30, 1934 ........----                                                                                  1, 516. 67

      Net total expenditures_ .....-                                                                                             66, 781.59
UTnexpended balance June 30, 1934__                                                                                              43,846.37

            Total amount appropriated to June 30, 1934_----                                                              _ 110, 627.96
                RIVERS AND HIARBORS-NEW                        ORLEANS, LA.,                     DISTRICT                   641

            Fiscal year ending June 30              1930         1931              1932            1933                1934

Cost of new work               ......                i.-.--           ..       .          ....            .           $2, 670.30
Cost    of maintenance-_-                           $15, 000   $3, 994. 03     ------------                   -----     .


Total expended------_ _                           -$15, 000
                                        -______-_ -1,153.       3, 994. 03 _-------------------                               63
Allotted----..                          ..                 -    4, 000.00           -$5. 97      -------.             45,000.00


Amount           allotted from WAr
                            Department Appropriation Act ap-
       proved                 ---------------------------
                   Apr. 26, 1934--                             $15, 000.03
Amount allotted from National Industrial Recovery Act approved
June 16, 1933----- -----------------------------------------   30, 000.00
            Amount to be accounted for-----------------------------                                              45, 000. CO
Gross amount                expended                           -------------                                          , 153. 63

      Balance unexpended June 30, 1934------------------------                                                   43, 846.37
Outstanding liabilities June 30, 1934----------------------------                                                27, 497. 19
            Balance available June 30, 1934                                                                      16, 349.18

                             25. CALCASIEU          RIVER AND PASS, LA.

   Location.-Calcasieu River has its source in southwestern Loui-
siana and flows in a generally southerly direction to the Gulf of
Mexico. About 25 miles from the Gulf it debouches into Calcasieu
Lake, which lake is about 18 miles long. The connection between
the lake and the Gulf, about 7 miles long, is known as Calcasieu
Pass. (See U. S. Coast and Geodetic Survey Chart No. 1116.)
   Previous projects.-The original project for this improvement
was adopted by the River and Harbor Act of June 10, 1872. Subse-
quent appropriations were made by the River and Harbor Acts of
March 3, 1881; August 2, 1882; July 5, 1884, and August 11, 1888.
The cost and expenditures prior to the adoption of the existing
project, in 1890, were $46,488.05. For further. details see Annual
Report for 1915, page 1853.
   Existing project.-This provides for the construction of two con-
verging jetties about 1.5 miles long, of brush and stone, at the Gulf
entrance of the pass, and dredging between them to secure a 12-foot
by 200-foot channel from the Gulf to the pass, so as to make the pass
serve as a harbor; for the dredging of the bars at the head and foot
of Calcasieu Lake to a depth of 8 feet, 80 feet wide, and, revetment
of the channel; for dredging a channel 12 feet deep and 90 feet wide
from the city of Lake Charles to the entrance of the Calcasieu-Sabine
section of the intracoastal waterway, with a turning basin 12 feet
deep and 1,000 feet long by 400 feet wide at the city of Lake
Charles; also for the improvement of the river from Philips Bluff to
its mouth by removing logs, snags, and overhanging trees, and by
dredging. Total length of improvement is 97 miles. Depths refer
to mean low Gulf. Under ordinary conditions the mean range of
tide is 10 inches at the mouth, diminishing to zero at Philips Bluff,
the extreme range of tide being 14 inches and zero, respectively.
   The estimate of cost for new work, revised in 1928, is $475,000,
which includes $25,500 for the turning basin and that portion of the
12 by 90 foot channel in Lake Charles, these estimates being exclusive
of amounts expended on previous projects. The latest (1928) ap-
proved estimate for annual cost of maintenance is $4,000.
642     REPORT OF   CHIEF OF ENGINEERS,      U.   S. ARMIY,   1934

    The existing project was authorized by the following river and
harbor acts: The act of September 19, 1890, provided for the con-
struction of the converging jetties and dredging between them
 (Annual Report for 1887, p. 1402) ; the act of July 13, 1892, provided
for the dredging of the bars at the head and foot of Calcasieu Lake
 (Annual Report for 1891, p. 1829); a modification of the original
project of 1872, dated May 12, 1881, provided for the general im-
provement of the river from Philips Bluff to its mouth (H. Ex. Doc.
No. 46, 46th Cong., 3d sess.); and the act of September 22, 1922,
provided for the 12 by 90 foot channel (H. Doc. No. 974, 66th Cong.,
:3d sess.). The latest published map is printed opposite page 2468
of the Annual Report for 1916.
    Reconmmended modifications of project.-Under date of December
i11, 1931, the Chief of Engineers recommended the maintenance of
the Lake Charles Deep Water Channel, extending from the Sabine
River to Lake Charles, to provide a, channel 30 feet in depth, with
a bottom width of 125 feet, and a turning basin at Lake Charles,
500 feet in width and 2,000 feet in length, at an estimated annual
cost of $50,000 for the initial maintenance and $30,000 annually
thereafter, subject to certain conditions of local cooperation (H. Doc.
No. 172, 72d Cong., 1st sess.).
    Local cooperation.-The act of September 22, 1922, adopted the
project given in House Document No. 974, Sixty-sixth Congress,
third session, and provided that " no expense shall be incurred by
the United States for acquiring any lands required for the purpose
of this improvement."
    Under date of January 5, 1922, a permit was granted by the As-
sistant Secretary of War to the police jury of Calcasieu Parish to
enlarge this, river where necessary between Lake Charles and the
eastern end of the Calcasieu-Sabine section of the intracoastal water-
way to a depth of 30 feet, with a bottom width of 125 feet.
    T
      erminal facilities.-Terminal facilities at the port of Lake
Charles are owned by the Lake Charles Harbor and terminal dis-
trict and operated by a board of commissioners. In addition to the
municipally owned terminals, there are several privately owned and
operated wharf structures located on the ship channel. The terminal
facilities are reported to be often taxed beyond their capacity.
    Operations and results during fiscal year.-None.
    Condition at end of fiscal year.--The various parts of the project
were completed as follows: The revetment in 1893, the jetties in
  1900, the dredging between jetties and in bars at head and foot of
Calcasieu Lake in 1903, and the snagging in 1906. No work has yet
been done by the United States on the 12- by 90-foot channel or
on the 12- by 400- by 1,000-foot turning basin at the city of Lake
  Charles. Due to the work of Calcasieu Parish, a depth of 30 feet
exists in this whole channel, except through Lake Charles, and a
  turning basin 30 by 550 by 2,000 feet has been made at the terminal
facilities about 1 mile below the lake, hence no dredging in the lake
  to provide a greater depth than the present one of 8 feet will be
             RIVERS AND HARBORS-NEW ORLEANS,                                                  LA., DISTRICT                         643
necessary, nor will a turning basin be needed at the original proposed
location. The jetties and channel are in good condition.
   The total costs under the existing project to the end of the fiscal
year were $637,551.13, of which $449,425.58 was for new work and
$188,125.55 for maintenance.
   The total expenditures -under the existing project to the end of the
fiscal year were $637,551.13.
   Proposed operations.-No funds available and no operations pro-
posed during the fiscal year 1935. The sum of $15,000 can be profit-
ably expended during the fiscal year 1936 in redredging the channel
through the lower end of the lake with one United States hydraulic
dredge during the period August 1 to September 15, 1935.
                                    Cost and financial sunmary

Cost of new work to June 30, 1934_____________________--------  $495, 913. 63
Cost of maintenance to June 30, 1934---------------------------  188, 125. 55

           Total cost of permanent work to June 30, 1934 --------------                                                    684, 039. 18

Net total expenditures_-----------------------------------------                                                           684, 039. 18

           Total amount appropriated to June 30, 1934---------------                                                       684, 039.18

           Fiscal year ending June 30                  1930               1931              1932                  1933            1934


Cost of new work_-------------------             ---          -------        --   --------------------------                       --------
Cost of maintenance__________________           _________
                                                __                  $12, 794. 07            $964. 35                $1. 68    --------
Total expended___--   ____- _________________                           12, 761. 58           980. 13               18. 39-
Allotted       -------------------------------------                    20,000. 00    -4,500. 00               -1,739.90        ........


Amount that can be profitably expended in fiscal year ending June 30,
1936, for maintenance-----------------------------------------__     $15, 000

                  26. LAKE CHARLES DEEP WATER                                         CHANNEL, LA.

   Location.-The Lake Charles Deep Water Channel, 38.5 miles in
length, extends from the Sabine River to the city of Lake Charles,
in Calcasieu Parish, La. From the Sabine River to the Calcasieu
River the channel follows the Calcasieu-Sabine section of the Intra-
coastal Waterway; the channel then follows the Calcasieu River,
except for several cut-offs at long bends and a dredged cut north of
Prien Lake to Lake Charles. This channel has access to deep water
through the Sabine River, Sabine-Neches Canal, Port Arthur Canal,
and Sabine Pass to the Gulf of Mexico. (See U. S. Coast and
Geodetic Survey Chart No. 1116.)
  Existing project.-No project has been authorized by Congress.
The maintenance of a channel 30 feet deep with a bottom width of
125 feet, from Sabine River to Lake Charles, with widening to 200
feet at curves and a turning basin 500 feet wide and 2,000 feet long
at Lake Charles, as recommended by the Chief of Engineers in House
Document No. 172, Seventy-second Congress, first session, at an esti-
mated annual cost of $50,000 for the initial maintenance and $30,000
annually thereafter was included in the public-works program under
the National Industrial Recovery Act.
644       REPORT      OF CHIEF      OF ENGINEERS,          U.   S. ARMY,   1934


  Recommended modifications of project.--Included in public-works
program.
  Local cooperation.-Local cooperation has been fully complied
with. Rights-of-way in fee-simple title were a :cepted by the Depart-
ment January 15, 1913. for the section from the Calcasieu River to
the Sabine River. Local interests have obtained 23 additional deeds
for rights-of-way and spoil-disposal areas,:titles-to which were trans-
ferred to the United States on January 19, 1934.
   Terminal facilities.-The terminal facilities at the Port of Lake
Charles are described under the improvement " Calcasieu River and
Pass ", p 642.
   Operations and results du:ring fiscal year--Maintenance of the
channel was begun under contract on June 4, 1934, and 19,477 cubic
yards of material were removed. The total costs were $6,628.09 and
the total expenditures $5,143.21, all for maintenance.
   Condition at end of fiscal year.-Maintenance dredging in the 30-
by 125-foot channel is 3.8 percent complete, 19,477 cubic yards of
material have been removed, leaving 492,523 cubic yards yet to be
removed. The controlling dimensions on June 30, 1934, were 28 feet
below mean low Gulf over a bottom width of 40 feet. in the shoal
sections and in excess of 30 by 125 feet in the remainder of the
channel.
   The total costs were $6,628.09 and the total expenditures $5,143.21,
all from Public Works funds and charged to maintenance.
  Proposed operations.-The balance of the allotment from National
Industrial Recovery Act funds, unexpended at the end of the fiscal
year, including accounts receivable, a total of $74,873.65, will be
applied as follows:
Accounts payable June 30, 1934----------------------------- $1, 501. 74
Maintenance dredging under contract in the Lake Charles Ship
Channel during the period July 1, 1934, to Aug. 31, 1934--------- 73, 371. 91

       Total----             ------------------------------------ 74, 873.65
  No additional funds can be profitably expended during the fiscal
year 1936.
                              Cost and financial summary

Cost of new work to June 30, 1934-------------------------- -------
Cost of maintenance to June 30, 1934------------------------- $6, 628. 09

      Total cost of permanent work to June 30, 1934-------------  628. 09         6,
Plus accounts receivable June 30, 1934---------------------------16. 86

      Gross total costs to June 30, 1934                                             644. 95
                                                                                  6--------------------------,
Minus accounts payable June 30, 1934     ---------------------------              1, 501. 74

      Net total expenditures--------------------------------                   5, 143. 21
Unexpended balance June 30, 1934---------------------------                   74, 856. 79

       Total amount appropriated to June 30, 1934--------------               80, 000. 00
            RIVERS AND HARBORS                   NEW ORLEANS,               LA., DISTRICT               645

        Fiscal year ending June 30              1930          1931         1932         1933         1934


Cost of new work------...--------------------------------------------------------
Cost of maintenance-------------- ------------------------------------------- $6, 628.09
Total expended--------     -----------------------                                                   5, 143.21
                                                                                                        000. 00
                                                                                               -80, 80,-00.-0
Allotted _.._ . ..    ..
    Alltte-------------------------------      ------------    ----------- ------------


Amount allotted from National Industrial Recovery Act approved
  June 16, 1938---------------------------------------              ------- $80, 000. 00
Gross amount expended_________----------- -------------------------           5, 143. 2.1

      Balance unexpended June 30, 1934_-----------------------                                 74, 856. 79,
Outstanding liabilities June 30, 1934_ _ __________--                         ___----          62, 108. 69

        Balance available June 30, 1934                              ----------                 12, 748. 10
Accounts receivable June 30, 1934_--_--------                                -------                  16. 86

        Unobligated balance available June 30, 1934----------------_                            12, 764. 96

            27. REMOVING THE WATER HYACINTH (LOUISIANA)

   Location.-Lakes and streams tributary to the Gulf coast.
   Existing project.-This project provides for the extermination or
removal of plants from the navigable waters of the States of Florida,
Alabama, Mississippi, Louisiana, and Texas, so far as they are or
may become an obstruction to navigation, by any mechanical, chemi-
cal, or other means whatsoever; for the construction and operation
of boats equipped with suitable machinery for such removal; and
for the construction and operation of booms to prevent the drifting
of plants from one stream to another. The latest (1928) approved
estimate for annual cost of maintenance is $25,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1899, made appropriations for the
States of Florida and Louisiana and provided for the extermination
or removal of plants, the building of boats, and the establishment of
booms (H. Doc. No. 91, 55th Cong., 3d sess.) ; the act of June 13, 1902,
authorized the use of any mechanical, chemical, or other means what-
soever; the act of March 3, 1905, made the appropriation available
for the State of Texas; the acts of March 3, 1905, and March 2,
1907, in making appropriations for Florida, provided that no chemi-
cal process injurious to cattle which may feed upon the water hya-
cinth shall be used; the act of July 25, 1912, made the appropriation
available for the State of Mississippi and also made available for use
in that State the operating plant pertaining to the work in Louisi-
ana; and the act of July 27, 1916, made the appropriation available
for the State of Alabama.
   Terminal facilities.-The terminal facilities of the various streams
from which hyacinths were removed are described in the reports for
the improvement of these streams.
646      REPORT       OF CHIEF OF ENGINEERS,        U. S. ARMY,        1934


   Operations and results during the fiscal year.-The U. S. spray-
boat Chene and steamer Hyacinth sprayed a total of 17,777,473
square yards of water hyacinths in Bayous Black, Barataria, Boeuf,
Bonfouca, Chene Blanc, Chevreuil, Des Allemands, Liberty, Little
Bayou Long, Lafourche, and Petite Amite, upon Amite, Blind, Blood,
Natalbany, Ponchatoula, and Tickfaw Rivers, upon Lakes Des Al-
lemands, Natchez, and Salvador, and sections of the intracoastal
waterway . Floating plant was also engaged in miscellaneous work,
such as pile driving, removing obstructions, and hyacinth-boom in-
stallation and maintenance. A total of 5,042,485 square yards of
alligator grass were removed by hand from Bayous Black, DuLarge,
Grand Caillou, Lafourche, LeCarpe, Teche, and Terrebonne.
   The total costs were $44,556.95, all for maintenance. The total
expenditures were $44,869.51.
   Condition at end of fiscal year.--From 1900 to 1902 a boat with
suitable machinery for removing and crushing the hyacinth was
operated. Since then the U. S. steamer Hyacinth, equipped with
means for spraying plants with a solution of arsenic and soda, has
been used in those streams of such commercial importance as to
justify improvement. Booms have been constructed at certain points
to prevent the drifting of the plant from nonnavigable streams into
those which are navigable. The work done has resulted in a great
benefit to navigation. In 1915 the U. S. barge Cheie was equipped
for spraying smaller streams, but was placed out of commission in
September 1922. A new steel hull for the Hyacinth was constructed
in 1925 and new upper works built thereon. The barge Chene was
recomnmissioned in August 1929 and in 1930 her machinery was
changed to greatly increase her efficiency. In 1932 a new steel spray-
boat was purchased and the machinery from the old barge Chene
transferred to the new sprayboat. This new plant was commissioned
in March 1933. The total costs were $713,605.49, all for maintenance.
The total expenditures were $750,860.08.
  Proposed operations.-Thebalance unexpended, including accounts
receivable at the end of the year, a total of $45,546.26, will be applied
as follows:
Accounts payable June 30, 1934---------------------                       $4, 264. 59
Maintenance (hired labor and Government plant) :
    Exclusion by structures, July 1, 1934, to June 30, 1935 --- ____      10,000. 00
    Removal by floating plant, July 1, 1934, to June 30, 1935 ---   26,281. 67
    Removal by hand, July 1, 1934, to June 30, 1935----------------5, 000. 00

      Total--------------------------------------------45,                     546. 26
  The additional amount of $85,000 can be profitably expended dur-
ing the fiscal year 1936 as follows:
Maintenance (hired labor and Government plant) :
   Exclusion by structures--------------------------------------              $30, 000
    Removal by floating plant_--------------                                   45, 000
    Removal by hand-- -----------------------------------------                 0, 000
      Total--------------------------------------------------                  85, 000
  The expenditures for hyacinth removal will be increased due to
large-scale removal operations during the entire year under a more
comprehensive program to obtain more satisfactory control, to pre-
vent propagation of plants, and to eradicate plants in certain areas.
            RIVERS AND HARBORS-NEW                           ORLEANS, LA., DISTRICT                             647
                                       Cost and financial summary

Cost of maintenance to June 30, 1934------------------------- $713, 605. 49
Value of plant, materials, etc., on hand June 30, 1934------------41, 482. 05

      Net total cost to June 30, 1934                                                                 755, 087. 54
Plus accounts receivable June 30, 1934-                                                                     3----------------------
                                                                                                            37. 13

      Gross total costs to June 30, 1934----------- --------- 755, 124. 67
Minus accounts payable June 30, 1934-------------------------   4, 264. 59
     Net total expenditures__------------------------------_                                          750, 860. 08
Unexpended balance June 30, 1934___                                                                    45, 509. 13
        Total amount appropriated to June 30, 1934--------------796,369. 21

        Fiscal year ending June 30               1930           1931           1932           1933            1934


Cost ofnew work      ----              ---                          -___
Cost of maintenance_-       -------     --    $31,923. 45    $24, 161.19    $33, 035. 53   $58, 604.95      $44,  95
                                                                                                               556.
Total expended-----------------------          33, 470. 35    30, 156. 53   42, 484. 91     58, 726. 21      44, 869. 51
Allotted---------------          ---           49, 000. 00    32, 000.00    22, 013.07      55, 523. 51      66, 752.63


Balance unexpended July 1, 1933------------------------------- $23, 626.01
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934                         $----------------------38,
                                                          000.00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933-----------------------31, 273.99
                                                                      69, 273. 99
Amount to be accounted for---------------------------------       92, 900. 00
Deductions on account of revocation of impounded funds----------- 2, 521. 36

      Net amount to be accounted for------------------------                                              90, 378. 64
Gross amount expended      ----------------------     44, 925. 49
Less receipts from sales----------------------------       55. 98
                                                                                                          44, 869. 51.

      Balance unexpended June 30, 1934----------------------                                              45, 509. 13
Outstanding liabilities June 30, 1934__                                                                    5,257. 66
     Balance available June 30, 1934------------------------                                              40, 251. 47
Accounts receivable June 30, 1934                                                                              37. 13

        Unobligated balance available June 30, 1934                                _         __           40, 288.60
Amount that can be profitably expended in fiscal year ending June
                           1- - - - - - - - - - - - - - - - - - - -- - -
30, 1936, for maintenance                                                                                85, 000. 00

  28. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                (GENERAL)

   The cost of work during the year amounted to $32,020.57; the
expenditures were $31,363.72. The balance unexpended, $39,832.17,
June 30, 1934, will be applied as needed during the fiscal year 1935
to payment of expenses incurred in connection with the above items.
The additional sum of $28,000 can be profitably expended during the
fiscal year ending June 30, 1936.
  1Exclusive    of available funds.
648           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                                1934

                                             Cost and financial summary

Cost of maintenance to June 30, 1934-----------------                                                                       $108, 370. 15
Minus accounts payable June 30, 1934--------------------------                                                                    895. 09

     Net total expenditures                                                                                                      07, 475. 06
                                                                                                                                1-----------------------------
Unexpended balance June 30, 1934---------------                                                                                  39, 832. 17

            Total amount appropriated to June 30, 1934                                      -------------- 147, 307. 23

            Fiscal year ending June 30                        1930               1931            1932                1933              1934


Cost of new work-------.. ----------------               ------------------------------------------------                         ------------
Cost of maintenance        ....--------------....         $11, 692. 83      $22, 509. 04     $22, 967.45       $14, 383. 17         $32, 020. 57

Total expended________ ____                         _   __ 12, 073. 20       20, 609. 69       24, 766. 91      14, 403. 66          31, 363. 72
Allotted.-------------------_                 _             14, 500. 00      15, 000. 00       24, 000. 00      34, 407. 24          47, 599. 99


Balance unexpended July 1, 1933--------------------------              $23, 595. 90
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934________________-------        $28, 000. 00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933--       --------------          12,500. 00
Amount allotted from War Department Appropriation
Act approved July 14, 1932---------------------            7, 904. 10
                                                                        48, 404. 10

      Amount to be accounted for                                                                                                  2, 000. 00
                                                                                                                                 7---------------------------
Deductions on account of revocation of impounded funds----------                                                                     804. 11

      Net amount to be accounted for---------------------------- 71, 195. 89
Gross amount expended---------------- ----------------------- 31, 363. 72

      Balance unexpended June 30, 1934----------------------39, 832. 17
Outstanding liabilities June 30, 1934                          , 863. 43
                                                              1--------------------------

            Balance available June 30, 1934--                              ---------------------                                 37, 968. 74

Amount that can be profitably expended in fiscal year ending June
                             --- - - - - - - - - - - - - -- - - - - - - - - - - - - - - -
30, 1936, for maintenance 1__ _                                                          28, 000. 00

                 29. Other projects for which no estimates are submitted
                      [Commercial statistics for these projects are given in pt. 2 of report]

                                                                     For last           Cost and expenditures to
                                                                     full re-                 June 30, 1934                       Estimated
Num-                                                                 port see                                                     amount re
ber                    Name of project                              Annual                                                       quired to
                                                                     Report             New work        Maintenance               complete
                                                                      for-

                                 1
    1 Pass Manchac, La. 2                                                 1931            $1, 374. 10         $4, 531. 36        Completed.
    2                       4 Manchac, La.' 3-_
        Amite River and Bayou                                             1932            28, 233. 68         61,   973.   63       Do.
    3   Bayou Lafourche, La. 5       -      -                             1925           252, 935.48          15,   445.   38        $229,500
    4   Bayou Terrebonne, La.1 6 .. . . . . . . .                         1932           120, 088. 71        121,   691.   31    Com pleted.
    5   Atchafalaya River, Morgan City to Gulf of                         1930           501, 963. 23        152,   765.   14       Do.
            Mexico, La.'
    6   Bayou Queue de Tortue, La.'-..............
                                    1                                     1924            33, 355. 18          4, 276. 10             Do.
    7   Bayou Plaquemine Brule, La.      - _-                             1932            32, 759. 90         28, 864. 70             Do.

  1 Channels adequate for commerce.
  2 Revoked fiscal year 1933, $248.04.
  3 Revoked fiscal year 1933, $1,850.40.
  4 Modification of project at estimated cost of $280,500, is recommended in H. Doc. No. 45, 73d Cong.,
1st sess.
  6Existing    project completed except for construction of new lock.
  6 Revoked fiscal year 1933, $3,011.31.

    1Exclusive      of available funds.
             RIVERS AND           HARBORS-GALVESTON,                     TEX.,           DISTRICT            649
Status of reports called for by river and harbor acts and committee resolutions


                       Locality                         Authorization act           Transmitted
                                                                                    to Congress       Recommen-
                                                                                                        dation
                                                                                    to   Congress       dation




Calcasieu River, La_                                  Rivers and Harbors
                                                        Committee resolu-
                                                        tion, Oct. 6, 1933.
Castaigne Bayou, La_                                  Rivers and Harbors            Aug. 10, 1933     Unfavorable.
                                                        Committee resolu-
                                                        tion, Feb. 11, 1932.
Chien Lake, La., to the Intracoastal Waterway ...     River and Harbor Act,          .. do . . .          Do.
                                                        July 3, 1930.
Grand Bayou Pass, La___________________________                         _-----do-   Aug. 15, 1933         Do.
Lafourche Bayou, La______________________________     Rivers and Harbors            Jan. 17, 1934         Do.
                                                         Committee resolu-
                                                        tion, Jan. 5, 1933.
Little Caillou Bayou, La__________________________    Rivers and Harbors
                                                         Committee resolu-
                                                        tion, Mar. 14, 1932.
Mississippi River at or near New Orleans, La., to     Rivers and Harbors
Corpus Christi, Tex., Intracoast I Waterway.           Committee resolu-
                                                        tion, Apr. 3, 1934.
Mississippi River to Intracoastal Waterway, via       River and Harbor              Aug. 15, 1933         Do.
  Bayou Manchac, Amite River, Lake Maurepas,            Act, July 3, 1930.
  Pass Manchac, Lake Pontchartrain, and the
  Rigolets, La.
Mississippi Valley flood control, view to construct
                                                Rivers and Harbors
locks in Upper Grand River, Bayou Sorrell, and   Committee resolu-
  Little Bayou Pigeon, La.                        tion, May 10, 1934.
Plaquemine Bayou, La., mouth of--...........    Rivers and Harbors
                                                  Committee resolu-
                                                  tion, Jan. 5, 1934.
Terre aux Boeuf Bayou and Delacroix Island, La_ Rivers and Harbors
                                                  Committee resolu-
                                                  tion, Feb. 25, 1927.



    IMPROVEMENT OF RIVERS AND HARBORS IN THE
            GALVESTON, TEX., DISTRICT

   This district includes all work of river and harbor improvements
in Texas with the exception of the Red River Basin and Johnsons
Bayou, La.
  District engineer: Maj. Milo P. Fox, Corps of Engineers, to July
7, 1933, and Lt. Col. E. H. Marks, Corps of Engineers, since that
date.
  Division engineer: Col. Warren T. Hannumn, Corps of Engineers.
                                            IMPROVEMENTS

                                              Page                                                               Page
  1. Sabine-Neches       Waterwayo                       S.    Double Bayou, Tex___                                85
                                                                                                                  6__
       Tex _______6__________---650                       9.   Anahuac Channel, Tex_____                          687
  2. The Louisiana and Texas                            10.    Cedar Bayou, Tex______ -                           689
       Intracoastal W a t e r w a y                     11.    Clear Creek, Tex   ___                             691
       from the Mississippi River                       12.    Freeport Harbor, Tex ____                          692
       at or near New Orleans,                          13.    Channel from Aransas Pass
       La., to Corpus Christi,                                   to Corpus Christi, Tex--_                        700,
       Tex. (Sabine River-Cor-                          14.    Channel from Pass Cavallo
        pus Christi section) ..--     657                        to Port Lavaca, Tex ____                         702
  3. Galveston Harbor, Tex ____       664                15.   Port Aransas, Tex _______                          703

                          im
  4. Galveston Channel, Tex ___
  5. Channel f ro          Galveston
        Harbor to Texas City,
                                      669                16.
                                                         17.
                                                               Brazos Island Harbor, Tex_
                                                               Examinations, surveys, and
                                                                 contingencies (general)
                                                                                                                  710
                                                                                                                  718
        Tex_ __------                 672                18.   Other projects for which no
  6. Channel to Port Bolivar.                                     estimates are submitted__                       720
        Tex---         ___         __  676               19. Flood control                Rio       Grande
   7. Houston Ship Channel. Tex_       67S                        near San Benito, Tex__ _                        720
650    REPORT   OF CHIEF   OF ENGINEERS,   U.   S.   ARMY,   1934

                1. SABINE-NECHES   WATERWAY,         TEX.

    Location.-This is a consolidation of the old improvements of
 " Harbor at Sabine Pass and Port Arthur Canal " and " Sabine-
Neches Canal, including Sabine River to Orange and Neches River
to Beaumont, Tex." Sabine Pass is on the Gulf of Mexico, approxi-
mately 80 miles east of Galveston and 435 miles west of New Orleans.
It connects Sabine Lake with the Gulf of Mexico. The Port Arthur
Canal extends from near the upper end of Sabine Pass to the Port
Arthur docks at the mouth of Taylors Bayou, a distance of 7 miles.
Near its upper end the Sabine-Neches Canal joins and extends to
the mouths of the Neches and Sabine Rivers. The.waterway next
extends up the Neches River to Beaumont and up the Sabine River
to Orange. (See U. S. Coast and Geodetic Survey Charts Nos. 517
and 533.)
    Pieevious projects.-The original project for improvement of
Sabine Pass was adopted by act of March 3, 1875, and subsequent
projects and modifications by acts of August 2, 1882, June 3, 1896,
June 13, 1902, and June 19, 1906. The Port Arthur Canal was con-
veyed to the United States free of cost in 1906, and the River and
Harbor Act of July 25, 1912, incorporated it in the project. The
Sabine and Neches Rivers were first improved under the River and
Harbor Acts of June 18, 1878, and March 3, 1899, and the Sabine-
Neches Canal was first improved under the River and Harbor Acts
of March 3, 1905, and March 2, 1907. The project was enlarged by
the River and Harbor Acts of February 27, 1911, July 25, 1912,
March 2, 1919, and September 22, 1922.
   The cost and expenditures prior to the adoption of the existing
project were $7,560,508.29, of which $5,180,831.51 was charged to
new work and $2,379,676.78 charged to maintenance. In addition,
 $577.506.78 was expended from contributed funds for new work, of
which $111,348.55 was for construction of the guard lock and $466,-
158,23 for dredging. For further details see page 1863 of Annual
Report for 1915 for the Sabine and Neches Rivers, Sabine Pass, and
Port Arthur Canal, and page 985 of the report for 1916 for Sabine-
Neches Canal. (See also pp. 1100 and 1105 of Annual Report for
1921, and p. 874 of Annual Report for 1926.)
   Existing project.-This provides for channel depths at mean low
water of 33 feet over Sabine Pass outer bar, 25 feet in the Sabine
River from the cut-off below Orange, Tex., up to and including the
Orange turning basin, and 30 feet in all other channels and turning
basins. The channel bottom widths as now provided for are 450 feet
over Sabine Pass outer bar; 300 feet between the Sabine Pass jetties
and in Sabine Pass; 200 feet in the Port Arthur Canal; 125 feet in
the channel connecting the Gulf Refining Co.'s turning basin in Tay-
lors Bayou with the Port Arthur west turning basin; 150 feet in the
Sabine-Neches Canal from the head of the Port Arthur Canal to
the mouth of the Neches River; 125 feet in the Sabine-Neches Canal
from the mouth of the Neches River to the mouth of the Sabine
River and up the Sabine River to the cut-off below Orange, Tex.;
150 feet in the Sabine River from the cut-off below Orange up to
the Orange turning basin; 125 feet in cut-offs and 150 feet in the
open river in the Neches River from the mouth to Beaumont, Tex.
         RIVERS AND    HARBORS-GALVESTON,      TEX.,   DISTRICT    651

    The project also provides for 2 turning basins at the head of
the Port Arthur Canal, one 420 feet wide by 1,800 feet long and the-
other 600 feet wide by 1,700 feet long; and I turning basin at.
Orange, Tex., and 1 at Beaumont, Tex., each 500 feet wide by
1,500 feet long; for extending the Beaumont turning basin upstream
over a bottom width of 350 feet to a point 200 feet above the newly
constructed city wharves; for the construction of 2 passing places
in the Sabine-Neches Canal and for an anchorage basin in Sabine
Pass near Sabine Light with a bottom width of 800 feet, including
the navigable channel, and a length of 4,500 feet, with dolphins on
100-foot centers along the east side of the basin. The project for
jetty work provides for 2 rubble mound jetties at the pass, the eastern
  jetty to be 25,270 feet long and the western jetty 21,860 feet long,
and includes the removal of the guard lock in the Sabine-Neches
Canal.
    The mean tidal variation at the entrance is about 11/2 feet, at Port
Arthur about 1 foot, and at Orange and Beaumont about five-tenths
foot. The effect of the wind is often greater than that of the tide.
    The estimate of cost for new work, revised in 1928, exclusive of
amounts expended on previous projects, is $6,250,000, made up as
follows: $3,494,500 for dredging work, of which $385,500 has been
contributed in cash and useful work performed, and $2,755,500 for
jetty work. The latest (1927) approved estimate for annual cost of
maintenance dredging is $420,000.
    The existing project was authorized by the following river
harbor acts: The act of July 25, 1912, provided for the present
                                                                   and
dimensions of the jetties (H. Doc. No. 773, 61st Cong., 2d sess.); the
acts of September 22, 1922, and January 21, 1927, provided for the
dimensions of the channels and turning basins (H. Doc. No. 975,
66th Cong., 3d sess.; S. Doc. No. 152, 67th Cong., 2d sess.; and H. Doc.
No. 287, 69th Cong., 1st sess.), and the act of March 3, 1925, pro-
vided for the removal of the guard lock (H. Doc. No. 234, 68th Cong.,
1st sess.). The latest published maps are in House Document No.
975, Sixty-sixth Congress, third session, and Rivers and Harbors
Committee Document No. 27, Seventy-second Congress, first session.
    Supplementing the work authorized by Congress the enlargement
of channels in the Sabine-Neches Waterway to provide a channel
450 feet wide and 35 feet deep through outer Sabine Pass Bar; a
channel between the jetties 35 feet deep and 450 feet wide at the outer
end, decreasing to 32 feet deep and 300 feet wide at the inner end;
a depth of 32 feet in all channels and turning basins between
the jetty channel and the mouth of the Neches River, and in the
Neches River to and including the Beaumont turning basin; a width
of 250 feet in the canal between Sabine Pass and Port Arthur, 200
feet in the canal between Port Arthur and the mouth of the Neches
River, 200 feet in the Neches River inluding cut-off channels; a new
cut-off at the bend at Smiths Bluff in the Neches River of the same
dimensions; an anchorage basin in Sabine Pass 800 feet wide, 3,000
feet long, and 32 feet deep; a channel through the west turning basin
at Port Arthur 325 feet wide, 1,700 feet long, and 32 feet deep;
and a turning basin in Taylors Bayou 150 to 1,000 feet wide, 2,900
feet long, and 32 feet deep. all at an estimated cost of $2.260,000,
with maintenance estimated at $122,000 annually in addition to that
652        REPORT OF CHIEF OF ENGINEERS,                      U.    S.   ARMY,       1934


now required for the adopted project, as recommended by the Chief
of Engineers in Rivers and Harbors Committee Document No. 27,
Seventy-second Congress, first session, was included in the Public
Works program under the National Industrial Recovery Act.
   Recommended modifications of project.-Included under Public
Works program.
   Local cooperation.-All local cooperation required under acts
adopting the existing project and under the National Industrial Re-
covery Act of June 16, 1933, have been met except that dolphins were
not constructed along the eastern side of the proposed anchorage
basin in Sabine Pass now provided for in the project adopted by
'Congress. The recommended project changes the location and size
of the Sabine Pass anchorage basin and eliminates the construction
of dolphins.
   Terminal facilities.-Modern terminal facilities adequate for pres-
ent commerce exist. (See p. 938, Annual Report for 1932, and Port
,Series No. 14, Corps of Engineers.)

                OPERATIONS        AND   RESULTS     DURING         FISCAL       YEAR


Project adopted by Congress.-Maintenance:Miscellaneous survey
work was done at various places on the waterway, and the Port
Arthur field office was maintained.
The following dredging work was done:

            Plant                       Locality                         Date                  Cubic yards


U. S. hopper dredge Chinook---- Sabine Pass outer bar and   July 1, 1933, to Aug. 6, 1933;         857, 620
                                  jetty channel.              and Sept. 18 to 20, 1933.
U. S. pipe-line dredge Kimble__ Sabine River_               July 1, 1933, to Feb. 11, 1934_        444, 186
    Do_                         Neches River-..        .    Apr. 27, 1934, to June 20, 1934_        90, 119
Contract dredging    -----------Sabine River                July 1, 1933, to Oct. 4, 1933__        341, 468



   A contract was completed from March 22 to April 24, 1934, cov-
ering repairs of a gap in the Sabine Pass east jetty by placing 344.56
tons of new cap stone, 87.5 tons of new core stone, and about 100
tons of core stone removed from the Sabine Pass jetty channel; this
contract also covered the removal of 5 metal skips from the Sabine
Pass jetty channel.
   A total of 1,733,393 cubic yards was removed by dredging from a
total channel length of 88,900 feet.
   Project authorized by the Federal Emergyency Administration of
Public Works-New work.-With funds provided from the National
Industrial Recovery Act under the Public Works program, the U. S.
hopper dredge Chinook dredged the Sabine Pass outer bar and jetty
channel and work was prosecuted under three contracts for dredging
the Port Arthur Canal, including the Port Arthur west turning basin
and entrance thereto, and Taylors Bayou turning basin; Sabine-
Neches Canal from the head of Port Arthur Canal to mouth of Neches
River, and the Neches River in the vicinity of Beaumont, Tex., in-
cluding the Smith Bluff cut-off, to secure various channel dimensions
                RIVERS AND             HARBORS-GALVESTON,                             TEX.,      DISTRICT                 653
recommended for adoption in Rivers and Harbors Committee Docu-
ment No. 27, Seventy-second Congress, first session.
   The following dredging was done:

                Plant                                   Locality                           Date                   Cubic yards
                                       Plant                                                                       removed


U. S. hopper dredge Chinook---.        Sabine Pass jetty channel               Sept. 21, 1933, to Mar. 18,          3, 831, 363
                                         and outer bar.                          1934.
Contract dredging-----------           Port Arthur Canal_.........             Oct. 18, 1933, to June 30, 1934_     3, 082, 622
        ...... ____ _______
   Do----                   __         Sabine-Neches Canal________             Nov. 16, 1933, to June 30,           1, 567, 030
                                                                                 1934.
    Do       .-----------------        Neches River _                          Dec. 23, 1933, to June 30, 1934_     1, 842, 910



   A total of 10,323,925 cubic yards was removed from a total channel
length of 106,973 feet.
   The total cost of all work for the year was $1,023,476.37, of which
$803,314.20 was from Public Works funds for new work and
$220,162.17 maintenance and improvement funds for maintenance.
   The total expenditure was $934,558.09, including $729,646.98 from
Public Works funds.
   Condition at end of fiscal year.-The Sabine Pass jetties are com-
pleted to full project dimensions.
   The existing project for dredging is completed, except that the
anchorage basin in Sabine Pass was not dredged due to failure of
local interests to cooperate by constructing dolphins along the eastern
side. The recommended project changes the location of the basin and
eliminates the use of dolphins.
   The dredging performed on the work authorized by the Public
Works Administration is about 55 percent completed.
   The controlling depths below mean low Gulf level on June 30, 1934,
were as follows: Sabine Pass outer bar, 35 feet; Sabine Pass jetty
channel, 35 feet; Sabine Pass, 32 feet; Port Arthur Canal, 32 feet;
Port .Arthur turning basins, 30 feet; Taylors Bayou turning basin,
27 feet; Sabine-Neches Canal from head of Port Arthur Canal to
mouth of Neches River, 31 feet; Sabine-Neches Canal, Neches River
to Sabine River, 31 feet; Neches River, mouth to Beaumont, 30 feet;
Beaumont turning basin, 30 feet; Beaumont turning basin extension,
32 feet; Sabine River, mouth to cut-off near Orange, 33 feet; Sabine
River, cut-off to Orange, including Orange turning basin, 25 feet.
   The total cost of existing and Public Works Administration proj-
ects to June 30, 1934, were as follows:

                                                                        New work           Maintenance            Total


Regular funds _   .    ................------------.   .                $4, 724, 137. 43   $4, 499, 411. 13   $9, 223, 548. 56
Public Works funds .. ________ _______ ___________ ___ _                    803, 314. 20           -              803, 314. 20
      Total United States funds          -.......       __ _   -    .    5, 527, 451. 63    4, 499, 411. 13   10, 026, 862. 76
Contributed funds (existing project)-               -          --          353, 500. 00     --                     353, 500. 00

     Total    (all   funds) --------                                     5, 880, 951.63     4, 499, 411. 13   10, 380, 362. 76
654      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

  The total expended, on the existing project to June 30, 1934, from
regular funds was $9,278,800.32, including $1,965.49 for Mississippi
River flood relief work. The total expenditure from Public Works
funds was $729,646.98. In addition, $353,500 was expended from
contributed funds for new work.
  Proposed operations.-The balance unexpended and accounts re-
ceivable at the end of the year, amounting to $135,461.84, will be
applied as follows:
Accounts payable June 30, 1934-----------------------------                     $2, 195. 17

Maintenance:
   Dredge inland channels where necessary with U. S. pipe-line
      dredge Sam Houston and other available dredges (between
      July 1, 1934, and June 30, 1935)-------------------_                      79, 266.67
   Dredge Sabine Pass outer bar and jetty channel with U. S. sea-
      going hopper dredges Chinook, Gat'veston, or other available
      dredge (March and April 1935) ------------------------                    54, 000. 00
                                                                            133, 266. 67

         Total-----        -----------------------------------              135, 461. 84
  The balance unexpended at the end of the year from allotment
made from the National Industrial Recovery Act of June 16, 1933,
amounting to $770,353.02, will be applied as follows:
Accounts payable June 30, 1934         -----------------------------        $73, 667.22

New work:
   Complete 3 existing contracts for dredging the Port Arthur
     Canal, Sabine-Neches Canal from Port Arthur Canal to mouth
     of Neches River, the upper Neches River near Beaumont, and
     the Smith Bluff cut-off in the Neches River (July to October
     1934) --------       ----------------------------------      400, 000. 00
   Complete dredging the Neches River where necessary from
     Clark Island cut-off to the mouth with a United States pipe-
     line dredge (Aug. 1, 1934, to June 1935) -----------------   215, 685. 80
   Dredge the Sabine Pass outer bar and jetty channel with the
     sea-going hopper dredges Chinook and Galveston (August
     1934 to October 1934) ---------------------------------       81, 000. 00

                                                                            696, 685. 80

         Total-----------------------------------------                  -- 770, 353. 02
  The additional sum of $840,000 can be profitably expended during
the fiscal year 1936, as follows:
New work:
   Dredge Sabine Pass anchorage basin by contract                (August 1935
     to March 1936) --------------------------------------                       $340, 000

Maintenance:
   Dredge inland channels where necessary with 2 United States
      dredges (July 1, 1935, to June 30, 1936) -------------------- 400, 000
   Dredge Sabine Pass outer bar and jetty channel with a United
      States sea-going hopper dredge (Jan. 1, 1936, to Mar. 31, 1936)_ 100, 000
         Total for maintenance---           ----------------------------          500, 000

         Total for all work          -----------------------------------840, 000
               RIVERS AND HARBORS-GALVESTON,                               TEX.,        DISTRICT                 655
                                     Cost and financial summary
                               MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 19341----------                                                       $9, 904, 968. 94
Cost of maintenance to June 30, 1934 2-------------------------                                      6, 879,087. 91

      Total cost of permanent work to June 30, 1934----------     16, 784, 056. 85
Value of plant, materials, etc., on hand June 30, 1934-----------      54, 332. 24

      Net total cost to June 30, 1934------------------     1 16, 838, 389. 09
Plus accounts receivable June 30, 1934-------------------------     3, 114. 69

      Gross total costs to June 30, 1934------------------------                                   16, 841, 503. 78
Minus accounts payable June 30, 1934 -------------------                                                 2, 195. 17
                            1
     Net total expenditures -              -------         16, 839, 308.61
Unexpended balance June 30, 1934--------------------------     132, 347. 15

           Total amount appropriated to June 30, 1934------------                                  16, 971, 655. 76

   Fiscal year ending June 30            1930             1931           1932               1933              1934


Cost of new work- .....          -    $166, 430. 56                   $29, 800. 06 .................
Cost of maintenance        _           590, 419. 28   $639, 753. 10   583, 061. 42      $381, 120. 53       $220, 162. 17
      Total cost                       756, 849. 84    639, 753. 10   612, 861. 48        381, 120. 53       220, 162. 17
Total expended-....                    749, 892. 63    679, 682. 14   681, 339.88         338, 544.77        204, 911. 11
Allotted    ______ _____   ______     306, 700. 00     425, 000. 00   -65, 000. 00        542, 421. 44       -9, 525. 22


Balance unexpended July 1, 1933___                                                                     $346, 783. 48
Amount allotted from War Department Appropriation Act ap-
                           _
proved Apr. 26, 1934 ------------------------------------                                               100, 000. 00

      Amount to be accounted for_         ------------------ -- 446, 783. 48
Deductions on account of revocation of allotment---------------109, 525. 22

      Net amount to be accounted for     ------------------------
                                          _                                                              337, 258. 26
Gross amount expended       ------------------------ $330, 456. 57
Less:
    Reimbursements collected--------- $100, 545. 46
    Receipts from sales ---------------     25, 000. 00
                                                        125, 545.46
                                                                                                         204, 911. 11

      Balance unexpended June 30, 1934___---------------------132, 347. 15
Outstanding liabilities June 30, 1934                            2, 279. 12

      Balance available June 30, 1934------------------------                                            130, 068. 03
Accounts receivable June 30, 1934-......                                                                   3, 114. 69

           Unobligated balance available June 30, 1934--------------                                     133, 182. 72

Amount that can be profitably expended in fiscal year ending June
                                  - -- - -- - -- - -- - -- - -- -
30, 1936, for maintenance 3___                                                                          500, 000. 00

  1 Exclusive of $353,500 expended from contributed funds.
  2 Increased $120,780.27 for sale of plant, etc.
  SExclusive of available funds.



        91536      ENG 1934--42
656           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                            1934

                                    PUBLIC WORKS FUNDS

Cost of new work to June 30, 1934 __________________________                                           $803, 314. 20
Cost of maintenance to June 30, 1934__    ____________

      Total cost of permanent work to June 30, 1934 _________-                                          803, 314. 20
Minus accounts payable June 30, 1934___  ______    _______1 1                                      1     73, 667. 22
     Net total expenditures_________________________-                                                   729, 646. 98
Unexpended balance June 30, 1934__                                                                      770, 353. 02

          Total amount appropriated to June 30, 1934 _______                           ___ -        1, 500, 000. 00

    Fiscal year ending June 30     1930           1931                      1932            1933             1934


Cost ofnew work-              __        -_                           -                 314.20
                                                                                   $803,
C ost ofm aintenance ..........................                 ........................--.
                                           .........................                 -   - -

Total expended-----------------                              ------------                                   729,646.98
A llotted
        --------------------- --------  .
                                     ------..--     -    -         --              -    -                 1, 500, 000. 00


Amount allotted from National Industrial Recovery Act approved
  June 16, 1933_----------------__                               $1,500,000. 00
Gross amount expended__________________________ $747, 601.49
Less reimbursements collected                        17, 954. 51
                                                                    729, 646. 98
      Balance unexpended June 30, 1934______________________      770, 353. 02
Outstanding liabilities June 30, 1934                  , 106. 59
                                                     6_____________
Amount covered by uncompleted contracts --------   456, 137. 51
                                                                  462, 244. 10
          Balance available June 30, 1934 _________________________                                     308, 108. 92
Amount (estimated) required to be appropriated for completion
tion of Public Works Administration project 1                                                          340, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1936, for new work 1_____   _____________________                                             340, 000. 00
CONSOLIDATED          COST AND FINANCIAL SUMMARY         FOR SABINE-NEOHEIS                    WATERWAY,            TEX.


Cost of new work to June 30, 1934 2____________________                                     __ $10, 708, 283. 14
Cost of maintenance to June 30, 1934                                                              , 879, 087. 91
                                                                                                 6______________________
      Total cost of permanent work to June 30, 1934__________                                      17, 587, 371. 05
Value of plant, materials, etc., on hand June 30, 1934_________                                         54, 332. 24

          Net total cost to June 30, 1934_________________________                                 17, 641. 703. 29
Plus accounts receivable June 30, 1934_______________________                                             3, 114. 69

      Gross total costs to June 30, 1934____________________                                       17, 644, 817. 98
Minus accounts payable June 30, 1934 _________.. ____________                                           75, 862. 39
          Net     total expenditures 2_____________                     __                         17, 568, 955. 59
Unexpended balance June 30, 1934___________________________                                             902, 700. 17
          Total amount appropriated to June 30, 1934_____________                                  18, 471, 655. 76

   1 Exclusive of available funds.
   2 Exclusive of $353,500 expended from contributed funds.
     Increased $120,780.27 for sale of plant, etc.
                RIVERS          AND HARBORS-GALVESTON,                                    TEX.,      DISTRICT                    657

   Fiscal year ending June 30                   1930              1931                  1932               1933              1934

Cost of new work                $166, 430. 56                                        $29, 800. 06   -----------            $803, 314. 20
Cost of maintenance ......... . 590, 419. 28                  $639, 753. 10          583, 061. 42    $381, 120. 53          220, 162. 17

      Total cost        ------------          756, 849. 84     639, 753. 10          612, 861. 48     381, 120. 53        1, 023, 476. 37

Total expended ----             _----------   749, 892. 63     679, 682. 14          681, 339. 88     338, 544. 77          934, 558. 09

Allotted    ---------------                   306, 700. 00       42, 500. 00         -65, 000. 00        542, 421. 44     1, 490, 474. 78


Balance unexpended July 1, 1933---------------------                                             _--__               $346, 783. 48
Ainount; allottedt from War Department Appropria-
  tion Act approved Apr. 26, 1934----------------                                              $100, 000. 00
Amount allotted from National Industrial Recovery
  Act approved June 16, 1933                                                               1--------------------,
                                                                                              500, 000. 00
                                                                                                               1, 600, 000. CO0

      Amount to be accounted for----------------------------1, 946, 783. 48
Deductions on account of revocation of allotment ------------- 109, 525. 22

      Net amount to be accounted for------------------------ 1, 837, 258. 26
Gross amount expended------------------------ $1,078, 058.06
Less-
    Reimbursements collected------ $118, 499. 97
    Receipts from sales ------------- 25, 000. 00
                                                   143, 499. 97
                                                                934, 558. 09
      Balance unexpended June 30, 1934-----------------------                                                           902, 700. 17
Outstanding liabilities June 30, 1934              $8, 385. 71
Amount covered by uncompleted contracts ....      456,137. 51
                                                                                                                        464, 523. 22

           Balance available June 30, 1934                         _                                                    438, 176. 95
Accounts receivable June 30, 1934__                                      ---------                             _           3,114. 69

           Unobligated balance available June 30; 1934------------_                                                     441, 291. 64
Amount (estimated) required to be appropriated for completion
of Public Works Administration project 1---------------------                                                          340, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1936-
   For new work ------------------------------------------
                                                       _                                                                340, 000. 00
      For maintenance                                    ----------------                                               500, 000. 00

           Total       --       --------                      -___----                                                  840, 000. 00


2. THE LOUISIANA AND TEXAS INTRACOASTAL WATERWAY FROM
  THE MISSISSIPPI RIVER AT OR NEAR NEW ORLEANS, LA., TO COR-
  PUS CHRISTI, TEX. (SABINE RIVER-CORPUS CHRISTI SECTION)

  Location.-This section of the intracoastal waterway will extend
from Sabine River, about 3 miles below Orange, to Corpus Christi,
Tex. The total length is about 295 miles, of which about 81 miles
will require no work. (See U. S. Coast and Geodetic Survey Charts
Nos. 1116, 1117, 1282, 1283, 1284, 1285, and 1286.)
  Previous projects-Sabine River-Galveston Bay Section.-None.
   (1) West Galveston Bay and Brazos River Canal, Tex., acts of
July 13, 1892, July 8, 1896, and June 13, 1902, the latter providing
   1Exclusive        of available funds.
658     REPORT OF CHIEF OF ENGINEERS,        U.   S.   ARMY,   1934


for the purchase of the Galveston and Brazos River Canal, and the
act of March 2, 1907.
    (2) Channel between Brazos River andl Matagorda Bay, Tex., acts
of June 25, 1910, and March 2, 1919.
    (3) Channel fromn Pass Cavallo to Aransas Pass, Tex., acts of
March 2, 1907, and July 25, 1912. For a full description of all
previous projects see pages 941, 944, and 947 of Annual Report for
1926. The total cost of all previous projects prior to operation under
the existing project to June 30, 1934, was $1,988,044.33, of which
 $534,161.70 was for new work and $1,453,882.63 for maintenance.
    The total expenditures on previous projects to June 30, 1934, were
 $1,986,471.57.
    Existing project.-This provides for a channel 9 feet deep at mean
low water and 100 feet bottom width, with 1 foot overcut in artificial
cuts, and 2 feet in lakes, from Sabine River to Corpus Christi, Tex.
The section of the waterway from the Sabine River end of the
Calcasieu-Sabine section to the Port Arthur Canal passes through
channels having dimensions larger than those approved for this
waterway. From Galveston Bay near Port Bolivar to the west end
of Galveston Channel and from Aransas Pass to Corpus Christi the
route also follows channels having dimensions larger than those
approved for the waterway. The project also authorizes the pur-
chase or construction of a 20-inch pipe-line dredge and provides for
locks in the canal on each side at the Brazos River crossing.
    The mean tidal variation is 0.5 foot at Orange, 1 foot at Port
Arthur, 1.7 feet in Galveston Bay, 1.8 feet at Freeport, 1 foot in
Matagorda Bay, and 1 foot at Corpus Christi. The extreme ranges
of tide under ordinary conditions are 1 foot at Orange, 1.5 feet at
Port Arthur, 2.3 feet in Galveston Bay, 2.5 feet at Freeport, 1.5 feet
in Matagorda Bay, and 1.5 feet at Corpus Christi. The height of
tides is dependent largely on the wind. Strong north winds have
depressed the water as much as 2 feet below mean low tide.
    The estimate of cost for new work, revised in 1927, is. $9,600,000
 (including $600,000 for a dredge), exclusive of amounts expended
on previous projects, and $530,000 for annual maintenance.
    The existing project was authorized by the following river and
harbor acts: The act of March 3, 1925, adopted the section of the
waterway from Sabine River to Galveston Bay, and the act of
January 21, 1927, adopted the section from Galveston Bay to Corpus
Christi, Tex. (H. Doc. No. 238, 68th Cong., 1st sess.). The latest
published maps are in the project document.
   Local cooperation.-The river and harbor acts of March 3, 1925.
and January 21, 1927 (H. Doc. No. 238, 68th Cong., 1st sess.), pro-
vide that no expense shall be incurred by the United States for
acquiring any land required for the improvement and that local
interests shall defray the cost of constructing or remodeling all high-
way bridges, together with their subsequent maintenance and oper-
iation, and shall furnish without cost to the United States all rights-
of-way and necessary spoil-disposal areas.
   Work shall not be commenced until the Secretary of War has re-
ceived satisfactory assurances that there will be available, by the date
of its completion, adequate vessels, terminals, and auxiliary equip-
ment for the economical handling of at least 400,000 tons annually on
          RIVERS   AND HARBORS-GALVESTON,          TEX.,   DISTRICT      659
the Sabine River (Galveston Bay section), and 300,000 tons annually
on the Galveston Bay (Corpus Christi section), and that the general
carrier service required for the New Orleans-Sabine River section
will be extended to terminals on Galveston Bay and at Houston.
Local interests have not complied with all of these requirements but
have furnished rights-of-way and dumping grounds for the Sabine
River-Galveston Bay section and through Galveston County west-
ward from Galveston Channel and have furnished satisfactory assur-
ances covering terminals, vessels, and auxiliary equipment for the
whole waterway.
  Terminal facilities.-There are terminal facilities at Orange, Port
Arthur, Galveston, Freeport, Port Aransas, and Corpus Christi,
where this waterway follows channels improved under other projects.
(See Port Series Nos. 6 and 14, Corps of Engineers.)

              OPERATIONS AND RESULTS DURING FISCAL YEAR

  Operationsconducted on the existing project under allotment from
the Federal Emergency Administration of Public Works-New
work.-With funds provided from the National Industrial Recovery
Act under the public works program the following work was
performed:
    (a) A railway swing bridge over the waterway at Mud Bayou near High
Island, Tex., including signal and fender systems, was 90 percent completed
by contract from October 12, 1933, to June 30, 1934.
    (b) A bridge tender's dwelling at the Mud Bayou railroad bridge was com-
pleted by contract from October 17, 1933, to May 2, 1934.
    (c) A steel sheet pile and stone dyke at the entrance into Galveston Bay
near Port Bolivar was completed by contract from November 8, 1933, to
February 6, 1934, by placing 47,496 square feet of steel sheet piles, 6,668.16
tons of stone, 8 cubic yards of concrete, 65 cubic yards of fill, and 1 man-
hole with cover.
    (d) A leased dredge removed 109,027 cubic yards from the waterway on
the west side of the Mud Bayou railroad bridge from April 16 to May 23, 1934,
and 212,030 cubic yards from the waterway at the entrance from Galveston
Bay near Port Bolivar from May 24 to June 30, 1934, to construct a hydraulic
fill from the north end of the bulkhead to the shore line.
    (e) The United States pipe-line dredge Kimbble removed 169,912 cubic yards
from the waterway on the east side of the Mud Bayou railroad bridge from
March 11 to April 26, 1934.
  Regular funds.-A contract was completed February 10, 1934, by
the removal of 1,773,438 cubic yards from the waterway from the
western end of Galveston Channel to the Galveston-Brazoria County
line.
  A total of 2,264,407 cubic yards was removed from a total channel
length of 35,527 feet.
   The total cost of all new work done during the fiscal year was
$493,614.07, including $389,986.78 allotted by the Public Works
Administration.
  Maintenance (existing project).-The U. S. pipe-line dredge Kimble
did maintenance dredging in the Sabine River-Galveston Bay sec-
tion from February 12 to March 10, 1934, and June 21 to 30, 1934,
removing 161,963 cubic yards from a channel length of 21,705 feet.
   Maintenance (previous projects).-The following dredging work
was done on the 5- by 40-foot canal under previous projects:
660        REPORT          OF   CHIEF OF ENGINEERS,             U.    S.    ARMY,      1934



           Plant                        Locality                           Date                Cubcyards
                                                                                                removed


Leased dredge_ __   ----        West Galveston Bay and      Dec. 16, 1933, to Feb. 20, 1934_       154, 480
                                 Brazos River Canal, Tex.
   Do_                          Channel between Brazos      July 1 to Dec. 15, 1933, and           654, 423
                                 River and     Matagorda      Feb. 21, to June 30, 1934.
                                 Bay, Tex.
U. S. derrick barge No. 8 -.-   Entrance from Matagorda     Sept. 1 to Dec. 15,1933       -----     20, 940
                                 Bay into the Colorado
                                 River.


   A total of 829,843 cubic yards was removed from a total of channel
lengths of 60,000 feet.
   In addition, the U. S. derrick barge No. 8 removed 418 snags and
logs from the entrance channel from Matagorda Bay into the Colo-
rado River. The Quintana, Bryan, Long's Bayou, and Caney Creek
highway bridges over the 5 by 40 foot waterway were operated
and maintained. Log booms at the Brazos River diversion channel
and at the head of Culver Cut near the mouth of the Colorado River
were maintained.
   The total cost of all maintenance work was $95,096.43, of which
$26,449.64 was for the existing project and $68,646.79 for previous
projects.
   The total expended was $552,394.67, of which $482,563.37 was for
the existing project, including $335,728.11 allotted by the Public
Works Administration, and $69,831.30) for previous projects.
   Condition at end of fiscal year.-The Sabine River-Galveston Bay
section of the waterway and the section westward from Galveston
Bay to the Galveston-Brazoria County line have been dredged to
full project dimensions. A railroad bridge and bridge-tender's
dwelling have been constructed at Mud Bayou, near High Island.
Tex. A steel sheet pile and stone dike has been constructed at the
entrance of the waterway into Galveston Bay near Port Bolivar,
Tex. An embankment being placed by a pipe-line dredge to connect
the north end of the Bolivar dike with the shore line is about 30
percent completed. Dredging the Galveston Bay-Freeport section
is about 40 percent completed. The entire project for dredging is
about 37 percent completed. Local interests have constructed a high-
way >bridge on:the Port Arthur-Sabine road and .are,constructing
another highway bridge west of the Mud Bayou railroad bridge.
Local interests have been requested to secure rights-of-way and
dumping grounds as needed from the Galveston-Brazoria County
line to Corpus Christi, Tex. The controlling depth in completed
sections of the waterway was 8 feet on June 30, 1934.
   The total cost of the existing project to the end of the fiscal year
was $1,646,669.58, of which $1,230.233.16 was for new work and
$26,449.64 for maintenance, from maintenance and improvement
funds, and $389,986.78 for new work from Public Works funds.
The total expenditures were $1.588,115.66, of which $835,728.11 were
Public Works funds.
   Maintenance (previous projects).-The controlling depths in the
5 by 40 foot waterway on June 30, 1934, were as follows:
   West Galveston Bay and Brazos Canal, Tex., 4.5 feet below mean
low Gulf level over a bottom width of 40 feet.
           RIVERS AND HARBORS-GALVESTON,                          TEX.,     DISTRICT            661
  Channel between Brazos River and Matagorda Bay, 2.5 feet below
mean low Gulf level over a bottom width of 40 feet.
  Channel from Pass Cavallo to Aransas Pass, 3 feet below mean
low Gulf level over a bottom width of 40 feet.
  The costs and expenditures on the 5 by 40 foot waterway are in-
cluded in the costs and expenditures given in paragraph " Previous
projects."
  Proposed operations.-The balance unexpended and accounts re-
ceivable at the end of the year, amounting to $94,479.83, will be
applied as follows:
Accounts payable June 30, 1934-----------------
                                 _                                                        $6, 151. 58
Maintenance (existing project) :
    Complete contract for furnishing plans
      and specifications and supervision as
      requested for railroad bridge at Mud
      Bayou near High Island, Tex. (July
      and August 1934) ---------------------    $450. 00
    Dredging where necessary with Govern-
      ment contract or leased plant from
      Sabine River to Galveston-Brazoria
      County line (July 1934 to June 1935)__ 74, 800. 00

         Total for existing project                                        $75, 250. 00
Maintenance (previous projects) :
   .Complete contract for dredging between
      Brazos River and Matagorda Bay
       (July and August 1934) -------                        11, 578. 25
    Maintenance        and operation of two            log
      booms (July 1934 to June 1935) --- _---                 1, 500. 00

         Total for previous projects------------------                      13, 078. 25

         Total for maintenance--------------------------------                            88, 328. 25

      Total-----------------------------------------                                      94, 479. 83
   The balance unexpended and accounts receivable at the end of the
year from allotment made from the National Industrial Recovery
Act of June 16, 1933, amounting to $117,003.06, will be applied as
follows :
Accounts payable June 30, 1934_--------------------------------       $54, 880. 01
    Complete construction of the Mud Bayou railroad
      bgdge by contract (July and,ugust     .1934) _-$37 123. 05
    Complete contract for placing emnbankment at steel
      sheet pile and stone dike near Port Bolivar,
     Tex. (July and August 1934) ---------------          25, 000. 00
                                                                       62, 123. 05

        Total----------------                                         ----------- 117, 003. 06
  The additional sum of $350,000 can be profitably expended during
the fiscal year 1936 as follows:
Maintenance (existing project) : Dredging the waterway where nec-
essary from Sabine River to Freeport, Tex., by leased, contract,
or Government plant (July 1, 1935, to June 30, 1936)------------ $265, 000
Maintenance (previous project) :
    Dredging channel where necessary from Freeport, Tex.,
      to Aransas Pass (July 1, 1935, to June 30, 1936)----- $60, 000
    Dredging bar at mouth of Colorado River by contract
      or leased plant (July and August 1935)-----------      25, 000
                                                                     85,000

        Total .----------------                                                             350, 000
662         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                          1934

                                   Cost and financial sumctmary

                           MAINTENANCE         AND IMPROVEMENT              FUNDS

Cost of new work to June 30, 1934-------------------------                                     $1, 764, 394. 86
Cost of maintenance to June 30, 1934                                                               480, 332. 27
                                                                                                1--------------------------,

      Total cost of permanent work to June 30, 1934 ----------                                    3, 244, 727. 13
Value of plant, materials, etc., on hand June 30, 1934                                                     91. 55

      Net total cost to June 30, 1934----------------------- 3, 244, 818. 68
Plus accounts receivable to June 30, 1934   --------------------     192. 02

      Gross total costs to June 30, 1934-------------------3, 245, 010. 70
Minus accounts payable June 30, 1934------------------           , 151. 5
                                                                6------

         Net total expenditures--------------------------------                                   3, 238, 859. 12
Unexpended balance June 30, 1934__----------                                                         94, 287. 81

         Total amount appropriated to June 30, 1934------------                                   3, 333, 146. 093

  Fiscal year ending          1930              1931                1932            1933                1934
        June 30

Cost of new work .....        $6, 556. 81      $67, 994. 66      $441, 753. 30    $526, 934. 38        $103, 627. 29
Cost of maintenance___        86, 151. 61      128, 305. 69        81, 956. 05      51, 877. 76          95, 096. 43

      Total cost_......       92, 708. 42      196, 300. 35       523, 709. 35     578, 812. 14         198, 723. 72

Total expended   -------      97, 884. 06     204, 886. 13        350, 600. 29     604, 132. 81         216, 666. 56
Allotted _----     ---     1, 139, 000. 00   -280, 500. 00    -1, 115, 014. 57     692, 041. 09       -137,    161. 08


Balance unexpended July 1, 1933------------------------------                                      $448, 115. 45
Amount allotted from War Department Appropriation
 :Act approved Apr. 26, 1934----------------------$64, 000. 00
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933------------------------ 30, 000. 00
                                                                                                     94, 000. 00

      Amount to be accounted for                           ___                                      542, 115. 45
Deductions on account of revocation of allotment---------------                                     231, 161. 08

      Net amount to be accounted for----------------------                                          310, 954. 37
Gross amount expended---------------------------219, 471. 33
Less reimbursements collected-------------------    2, 804. 77
                                                                                                    216, 666. 56

      Balance unexpended June 30, 1934------------                                                   94, 287. 81
Outstanding liabilities June 30, 19384..............                             6, 207. 68
Amount covered by uncompleted contracts-----------                                  358. 81
                                                                                                       6, 566. 49

     Balance available June 30, 1934_----------------------_                            ----           7, 721. 32
Accounts receivable June 30, 1934______                                                                   192. 02

Unobligated balance available June 30, 1934-------------                                             87, 913. 34

Amount (estimated) required to be appropriated for completion
of existing project                                            5, 400, 000. 00
                                                          _-----------------------

Amount that can be profitably expended in fiscal year ending
June 30, 1936, for maintenance ---------------------------                                         350, 000. 00

  1Exclusive of available funds.
                RIVERS AND HARBORS-GALVESTON                                   TEX.z DISTRICT                          663
                                        PUBLIC WORKS          FUNDS

Cost of new work to June 30, 1934 ---                        -           -______-                        986. 78
                                                                                              -_______-$389,
Cost of maintenance to June 30, 1934__                       _________                                     ------------
      Total cost of permanent work to June 30, 1934 -----------                                               389, 986. 78
Value of plant, materials, etc., on hand June 30, 1934 __________                                                  594. 39

      Net total cost to June 30, 1934_--__- ____-------                                                       390, 581. 17
Plus accounts receivable June 30, 1934 __________--------------------------                                         -26. 95

      Gross total costs to June 30, 1934____ ________________                                                 390, 608. 12
Minus accounts payable June 30, 1934____________________      __                                               54, 880 . 01

      Net total expenditures-------------------------------                                                   335, 728. 11
Unexpended balance June 30, 1934 --------------------------                                                   116, 976. 11

           Total amount appropriated to June 30, 1934_____________                                            452, 704. 22

           Fiscal year ending June 30               1930          1931           1932               1933             1934

Cost of new work _.............         .           -..-                  -           -       ---      -         $389,986.78
Cost of maintenance-                                                          -----------------------------------
Total expended                                      -                                                             335, 728. 11
Allotted           --                       _....       ____--
                                                            _..     . ----------...       .    .452,                   704. 22


Amount allotted from National Industrial Recovery Act approved
June 16, 1933___--__----     -      -   ---       -_                                                       $452, 704. 22
Gross amount expended __________________________                                $335, 838. 13
Less reimbursements collected_                      -                                     110. 02
                                                                                                              335, 728. 11

      Balance unexpended June 30. 1934-----------------------                                                 116, 976. 11
Outstanding liabilities June 30, 1934_----------        247. 18
                                                       2,
Amount covered by uncompleted contracts ---------   96, 314. 07
                                                                                                               98, 501. 25

      Balance available June 30. 1934---------------------                                                     18, 414. 86
Accounts receivable June 30, 193------------------------------                                                      26. 95

           Unobligated balance available June 30, 1934______________                                           18, 441. 81

CONSOLIDATED         COST   AND FINANCIAL           SUMMARY        FOR LOUISIANA-TEXAS                        WATERWAY


Cost of new work to June 30, 1934__________________________ $2, 154, 381. 64
Cost of maintenance to June 30, 1934 ______1 __________ 1, 480, 332. 27
      Total cost of permanent work to June 30, 1934 --                                    ___ -3,             634, 713. 91
Value of plant, materials, etc., on hand June 30, 1934                         ----------                          685. 94
      Net total cost to June 30. 1934________________________                                              3, 635, 399. 85
Plus accounts receivable June 30, 1934 -- __- ________________                                                     218. 97

      Gross total costs to June 30, 1934____________________                                               3, 635, 618. 82
Minus accounts payable June 30, 1934--                     _                                                    1,031. 59
                                                                                                               6-----------------

     Net total expenditures _____________..__________                                                      3, 574, 587. 23
Unexpended balance June 30, 1934_____________--   __211,                                                           263.92
           Total amount appropriated to June 30, 1934___________                                           3;785, 851. 15
664         REPORT       OF CHIEF           OF ENGINEERS,                    U.    S. ARMY,               1934


  Fiscal year ending
        June 30               1930              1931                     1932                 1933                1934


Cost of new work ....        $6, 556. 81       $67, 994. 66            $441, 753. 30     $526, 934. 38           $493, 614. 07
Cost of maintenance__        86, 151. 61       128, 305. 69              81, 956. 05       51, 877. 76             95, 096. 43
      Total cost --          92, 708. 42       196, 300. 35             523, 709. 35         578, 812.14          588, 710. 50
Total expended ......        97, 884. 06       204, 886. 13             350, 600. 29         604, 132. 81         552, 394. 67
Alotted ....--   - ---    1, 139, 000. 00    -280, 500. 00       -- 1, 115, 014. 57          692,041.09           315, 543. 14


Balance unexpended July 1 1933                 ______ ___-_-__ ___                                          $448, 115. 45
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934-----------------_          $64, 000. 00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933--------------------            30,000. 00
Amount allotted from National Industrial Recovery
Act approved June 16, 1933_____________________ 452, 704. 22
                                                                                                              546, 704. 22
         Amount to be accounted for-------------------__                                 -            -       994, 819. 67
Deductions on account of revocation of allotment---------------                                               231, 161. 08

      Net amount to be accounted for--------------------------763, 658. 59
Girss amount expended---------------------------_                555, 309. 46
Less reimbursements collected__                 _---------------   2, 914. 79
                                                                              552, 394. 67
         Balance unexpended June 30, 1934-__                                                 ___-_            211, 263. 92
Outstanding liabilities June 30, 1934                         ------                    8, 454. 86
Amount covered by uncompleted contracts----------                                      96, 672. 88
                                                                                                              105, 127. 74

         Balance available June 30, 1934                                                                            136. 18
                                                                                                              1--------------------------06,
Accounts receivable June 30, 1934_ _----                                                                            218. 97

         Unobligated balance available June 30, 1934---------------                                           106, 355. 15

Amount (estimated) required to be appropriated for completion
   of existing project 1                           __--_-__                                                 5, 400, 000. 00

Amount that can be profitably expended in fiscal year ending
   June 30, 1936,. for maintenance                               _______                              _       350, 000.. 00

                             3. GALVESTON HARBOR, TEX.

   Location.-This harbor is situated on the Gulf of Mexico, on the
northern portion of the coast of Texas, 345 miles west of the mouth
of the Mississippi River and 330 miles northeast from the mouth of
the Rio Grande. (See U. S. Coast and Geodetic Survey Chart
No. 520.)
   Previous projects.-Adopted by acts approved June 23, 1874, June
14, 1880, and August 5, 1886. Total cost and expenditures under
previous projects, including repairs made to jetties damaged by
storm of 1900, were $8,508,123.29, of which $8,421,996.57 was for new
work and $86,126.72 was for maintenance. For further details see
page 1854, Annual Report for 1915.
    Exmisting project.-This provides for two rubblestone jetties ex-
tending from Galveston Island (on the south) and Bolivar Peninsula
  (on the north) into the Gulf of Mexico (the south jetty being 35,900
   IExclusive of available funds.
          RIVERS    AND HARBORS-GALVESTON,      TEX.,   DISTRICT   665

feet long and the north jetty 25,907 feet long) and for the dredging
of a channel between them 35 feet deep at mean low tide and 800
feet wide on bottom from the Gulf to Galveston Channel, a distance
of about 6 miles. It further provided that this channel should be
maintained for a period of 2 years, at the end of which time the
advisability of permanently adopting these dimensions would be de-
termined. Upon the completion of the 2-year period the Board of
Engineers for Rivers and Harbors, in connection with the 30-foot
depth authorized for Galveston Channel, approved the tentative
adoption of depths of " 32 feet on the inner bar and not over 34 feet
on the outer bar." In the River and Harbor Act approved January
21, 1927, Congress authorized an increase in the project depth of Gal-
veston Channel to 32 feet, and depths of 34 and 35 feet on the inner
and outer bars. (H. Doc. No. 307, 69th Cong., 1st sess.)
   Under ordinary conditions the mean tidal range is 2 feet on the
outer bar and 1.64 feet on the inner bar. The extreme ranges are
2.76 and 2.27 feet, respectively. The height of the tides is dependent
largely on the wind, and during strong "northers " in the winter
season the water surface may be depressed 2 feet below mean low
tide.
  The estimated cost of maintaining a 35-foot depth in the outer
bar and a 34-foot depth in the inner bar, made in 1928, is $150,000
annually.
  The present jetties were authorized by the River and Harbor Act
approved August 5, 1886 (H. Doc. No. 85, 49th Cong., 1st sess.);
their extension and the construction and operation of a new dredge
by the River and Harbor Act approved March 2, 1907 (H. Doc. No.
340, 59th Cong., 2d sess., as modified by Rivers and Harbors Com-
mittee Doc. No. 11, 59th Cong., 2d sess.), the deepening of the chan-
nel to 35 feet, with width of 800 feet for an experimental period of
2 years, by the River and Harbor Act approved July 18, 1918
(H. Doc. No. 758, 65th Cong., 2d sess.). The latest published maps
are printed in the Annual Report for 1915, page 2623, and in Rivers
and Harbors Committee Document No. 31, Seventy-second Congress,
first session.
  Supplementing the work authorized by Congress, the maintenance
of channels 12 feet deep and 100 feet wide: to the highway ferry
landings on Galveston Island and Bolivar Peninsula channelward
of harbor lines, as recommended by the Chief of Engineers in Rivers
and Harbors Committee Document No. 31, Seventy-second Congress,
first session, was included in the Public Works program under the
National Industrial Recovery Act.
   Recomnended modifications of project.-Included in Public Works
program.
  Terminal facilities.-Extensive terminal facilities are located on
Galveston Channel, Texas City Channel, Port Bolivar Channel, and
the Houston Ship Channel.          (See Port Series No. 6, Corps of
Engineers.)

                 OPERATIONS AND RESULTS DURING FISCAL YEAR


  Existing project.-Maintenance: The U. S. hopper dredge Gal-
veston, between July 1 and August 5, 1933, partly redredged the
inner and outer bar channel, removing a total of 364,135 cubic yards
666        REPORT OF CHIEF                       OF ENGINEERS,   IJ.   S.   ARMY,   1934


of sand and silt (hopper measurement) at a cost of $19,988.32. The
Chinook, between August 7 and September 7, 1933, and between April
23 and June 30, 1934, worked in redredging the inner and outer bar
channel, removing a total of 1,519,263 cubic yards of sand and silt
 (hopper measurement) at a cost of $89,974.43. Total cubic yards
removed in the above dredging was 1,883,398. Total cost of above
dredging was $109,962.75. There were additional costs amounting to
$3,465.35 for miscellaneous surveys and inspections. Total cost of
maintenance work was $113,428.10.
   Project authorized by the Federal Emergency Adm inistration of
Public Works.-The U. S. dredge San Houston, between Septem-
ber 22 and 28, 1933, did maintenance dredging in the channel leading
to the highway ferry landings on Galveston Island and Bolivar
Peninsula, redredging 1,400 linear feet of the channel extending from
the harbor line at Bolivar Peninsula to deep water in Galveston
Harbor, removing a total of 43,722 cubic yards of sand and silt at a
cost of $3,839.59.
   The total cost of all work on this improvement for the year was
$117,267.69, all for maintenance, including $3,839.59 from Public
Works funds. Total expenditures were $115,001.03, of which
$3,839.59 were Public Works funds.
    Condition at end of fiscal year.-The existing project was com-
pleted   in 1910, except the 35-foot channel, which was completed in
1922. The tidal scour, assisted by dreding, had previously formed a
channel midway between the jetties 32.5 feet deep at mean low tide
and 1,450 feet wide between the 30-foot contours.
   Under the project authorized by the Public Works Administration
the channel leading to the highway ferry landings on Galveston
Island and Bolivar Peninsula was dredged in 1933.
    On June 30, 1934, the ruling depth at mean low tide was about
331/2 feet on the inner bar and 341/2 feet on the outer bar and about
10 feet in the highway ferry channel.
    The total cost of the existing project to June 30, 1934, was $4,845,-
378.86, of which $2,441,080.43 was for new work and $2,404,298.43 for
maintenance. The total expenditures were $4,836,431.70, all regular
funds.
    The total cost and expenditures on the work authorized by the
Public Works Administration was $3,839.59, all for maintenance.
   Proposed operations.-The balance unexpended July 1, 1934,
amounting to $112,750.74, will be applied as follows:
Accounts payable June 30, 1934_._____                                                  $8, 947.'16
Maintenance: Dredging of inner- and outer-bar channel by United
  States seagoing hopper dredge, July and August 1934; March
  and April 1935---------------------------                                           103, 803. 58

        Total --------------------------------                                        112, 750.74

  The balance unexpended July 1. 1934, amounting to $11,160.41
from the $15.000 allotted to Galveston Harbor and Channel, Tex.,
from the National Industrial Recovery Act approved June 16, 1933,
will be applied to dredging of the highway ferry channels leading
to Galveston Island and Bolivar Peninsula by contract between
November 1934 and January 1935.
             RIVERS AND              HARBORS-GALVESTON,                                    TEX.,         DISTRICT                      667
  The additional sum of $157,500 can be profitably expended during
the fiscal year 1936, to be applied to maintenance dredging of inner
and outer bar channels by the United States seagoing hopper dredge,
January to May 1936, and maintenance dredging of the highway
ferry channel between Galveston Island and Bolivar Peninsula.
                                         Cost and financial summary
                              MAINTENANCE            AND IMPROVEMENT                        FUNDS


Cost of new work to June 30, 1934_ _-----    --             $10, 863, 077. 00
Cost of maintenance to June 30, 1934-----------------------   2, 490, 425. 15

      Total cost of permanent work to June 30, 1934                                                      --             13, 353, 502.15
Minus accounts payable June 30, 1934-...........                                                                              8, 947. 16

        Net total expenditures _                      _        -------                                                  13, 344, 554. 99
Unexpended balance June 30, 1934_---------------------------                                                               112, 750. 74

        Total amount appropriated to June 30, 1934                                                 _                    13, 457, 305. 73
                                     I                    I                   I                      I                     I
   Fiscal year endi      June 30             1930                1931                    1932                  1933                 1934

                                                                                  -------------- ..............                --------------
Cost of new work      ------------
Cost of maintennce .......... $163, 731.83                    $140, 865.64           $38,918.57           $89,900.89             $113,428.10

Total expended__                           192, 966. 15         94, 140. 62            30, 949. 32       -- 18,089.54              111, 161. 44

Allotted-____..-...                         55, 000. 00        126, 000. 00        -140,000. 00               84, 923.13           62, 829.53


Balance unexpended July 1, 1933_ ----------------------------- $161, 082. 65
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934_____________________ $100, 500. 00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933------------------------    15, 000. 00
                                                                  115, 500. 00
     Amount to be accounted for-_____-_____         -___________ 276, 582. 65
Deductions on account of revocation of allotment----------------  52, 670. 47
      Net amount to be accounted for-.-------  ------------
                                                         _                                                                     223, 912. 18
Gross amount expended------ ---------------------------                                                                        111, 161. 44
        Balance unexpended June 30, 1934-------------------                                                                    112, 750. 74
Outstanding liabilities June 30, 1934------------------------_                                                                    8, 955. 26
         Balance available               June 30, 1934___                                                                      103, 795. 48

Amount that can be profitably expended in fiscal year ending June
                           1- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
30, 1936, for maintenance                                                                  _                                  150, 000. 00
                                              PUBLIC WORKS FUNDS

Cost of new work to June 30, 1934--------------------------------------
Cost of maintenance to June 30, 1934 ---------------------------- $3, 839. 59
         Total cost of permanent work to June 30, 1934                                                                            3-------------
                                                                                                                                   , 839. 59
Net total expenditures                                                                                                            , 839. 59
                                                                                                                                 3--------------------------
Unexpended balance June 30, 1934-----                                    ---------------------                                  11, 160. 41
        Total amount appropriated to June 30, 1934 -----------                                                    ___           15,000. 00

  1 Exclusive of available funds.
668           REPORT OF                     CHIEF OF ENGINEERS,                                 U.     S.      ARMY,           1934


            Fiscal year ending June 30                             1930              1931                 1932             1933                1934


Cost of new work                                                       ---------                         -------      -----------         -----------
Cost of maintenance                                   -     -                                        ------ -----                             $3,839. 5
Total expended          .---_                                      ----.--                                                    - ---            3,839 59
Allotted        _                                                                                    -----                            -           50)
                                                                                                                                              11-100


Amount allotted from National Industrial Recovery Act approved
    June 16, 1933_ ..........                        --                -        -           -                                         $15, 000. 00
Gross amount expended------------------------------                                                                                        3,839. 59
            Balance unexpended June 30, 1934---------------                                                                                 11,160.41

Amount that can be profitably expended in fiscal year ending
June 30, 1936, for maintenance 1                                                                                                          7, 500. 00
     CONSOLIDATEDI              COST     AND     FINANCIAL            SUMMARY               FOR, GALVESTON                HARBOR,            TEX.


Cost of new work to June 30, 1934-------------------------- $10, 863, 077. 00
Cost of maintenance to June 30, 1934------------------------- 2, 494, 264. 74
     Total cost of permanent work to June 30, 1934----------_13,                                                                      357, 341.74
Minus accounts payable June 30, 1934 -----------------------                                                                            8, 947. 16

      Net total expenditures --------------------------------                                                                  13; 348, 394.58
Unexpended balance June 30, 1934---------------------------                                                                        123, 911. 15

            Total amount appropriated to June 30, 1934------------                                                             13, 472, 305. 73

   Fiscal year ending June 30                       1930                     1931                1932                  1933                   1934


C ost of n ew wo rk-....... .......          ..... .. . .. .....    ....... ........         ....... ....... ........ ....... .......
Cost of maintenance-....... _                     $163, 731. 83      $140, 865. 64           $38, 918. 57    $89, 900. 89   $117, 267. 69
Total expended_-                                 192, 966. 15              94, 140. 62          30, 949. 32         -18, 089. 54             115, 001. 03
Allotted.           _   __-_           __          11___
                                                   55,000. 00          126,000. 00       -140,       000. 00         84,923. 13               77, 829. 53


Balance unexpended July 1, 1933-----------------------------    $161,082.65
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934---------------------- $100, 500. 00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933-------------------------15,000. 00
Amount allotted from National Industrial Recovery
Act approved June 16, 1933----------------- __      15, 000.00
                                                                 130, 500. 00
     Amount to be accounted for___                                                                                                    291, 582. 65
Deductions on account of revocation of allotment----------------                                                                       52, 670. 47

      Net amount to be accounted for---------------------_                                                                            238, 912. 18
Gross amount expended ---------------------------------------                                                                         115, 001.03
                                            _
      Balance unexpended June 30, 1934 ---------------------      123, 911. 15
Outstanding liabilities June 30, 1934----------------------------   8, 955. 26

            Balance available June 30, 1934--------------------------114, 955.89

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1----------------------------------                                                                        157, 500.00

   1Exclusive of available funds.
        RIVERS AND HARBORS-GALVESTON,         TEX., DISTRICT      669
                   4. GALVESTON CHANNEL, TEX.

   Location.-This channel extends from a point in Galveston Har-
bor between Bolivar Peninsula and Fort Point across the former
inner bar to and along the wharf front of Galveston. (See U. S.
Coast and Geodetic Survey Chart No. 520.)
   Emisting project.-This provides for a channel 32 feet deep at
mean low tide and 1,200 feet wide from the outer end of the old
inner bar near Fort Point to Fifty-first Street in the city of Galves-
ton, and for its extension, when the interests of navigation and
commerce require it, with a width of 1,000 feet and depth of 32 feet
at mean low tide, to Fifty-seventh Street in the city of Galveston;
and for an extension of the existing sea wall, which lies along the
Gulf front of Galveston, from its angle, at Sixth Street and Broad-
way to the south jetty, with protection at its junction with the south
jetty, this extension of the sea wall being for the purpose of protect-
ing the outer end of the channel from the effects of hurricanes.
    Under ordinary conditions the mean tidal range is about 1.1 feet
and the extreme range about 1.6 feet. The height of tide is depend-
ent largely on the wind, and during strong north winds in the win-
ter season the water surface may be depressed 2 feet below mean low
tide.
    The estimated cost of new work on the channel, revised in 1927, is
$3,041,000 and of the sea-wall extension, revised in 1922, $2,986,000.
The latest (1928) approved estimate for annual cost of maintenance
of the channel is $225,000.
    The existing project was authorized by the following river and
harbor acts: The act of June 13, 1902, provided for the excavation
of the channel 1,200 feet wide and 30 feet deep from outer end of
inner bar to Fifty-first Street (H. Doc. No. 264, 56th Cong., 2d
sess.); the act of March 3, 1905, provided for the purchase or con-
struction of a hydraulic pipe-line dredge; the act of March 2, 1907,
provided for the extension of the channel from Fifty-first Street to
Fifty-sixth Street, with a width of 700 feet and a depth of 30 feet
 (H. Doc. No. 768, 59th Cong., 2d sess.) ; the act of June 25, 1910,
provided for the extension of the channel at such time as the in-
terests of navigation and commerce demand to Fifty-seventh Street,
with a width of 1;000 feet and depth of 30 feet between Fifty-first
and Fifty-seventh Streets (H. Doc. No. 328, 61st Cong., 2d sess.);
the act of July 27, 1916, provided for the extension of the sea wall
from angle at Sixth Street and Broadway to a point abreast of the
nearest battery at Fort San Jacinto (H. Doc. No. 1390, 62d Cong.,
3d sess.); the act of September 22, 1922. provided for the further
extension to junction with the south jetty and protecting it at this
junction and for repairing the sea wall in front of the Fort Crockett
Reservation (H. Doc. No. 693, 66th Cong., 2d sess.); and the act
of January 21, 1927, provided for the present channel dimensions
 (H. Doc. No. 307, 69th Cong., 1st sess.). The latest maps are pub-
lished in the Annual Report for 1914, page 2285, House Document
No. 693, Sixty-sixth Congress, second session, and House Document
No. 307, Sixty-ninth Congress, first session.
670         REPORT         OF CHIEF OF ENGINEERS, U.                 S. ARMY,           1934

   Local cooperation.-Fully complied with.
   Terminal facilities.-The terminal facilities at Galveston are the
most extensive on the Texas coast. They are located almost entirely
on the south side of the channel and extend from Tenth Street to
Forty-fifth Street, a distance of 21/2 miles. The wharf system has
sufficient capacity to furnish berthage for about 79 average-size
ocean-going freight carriers at one time. The terminal facilities at
Galveston are considered adequate for existing commerce. (For
further details see Port Series No. 6, Corps of Engineers.)
   Operations and results during fiscal year.-New woork.-None.
  Maintenance.-The channel was redredged under contract between
September 1, 1933, and February 9, 1934. A total of 4,724,644 cubic
yards of silt and sand was removed at a cost of $242,916.75.
   A small force was employed occasionally in maintenance of the
sea-wall extension, viz, filling small gullies, cutting weeds on the rear
slope, and making repairs to the brick pavement, at a total cost of
$4,901. There were additional costs, amounting to $580.40, for mis-
cellaneous surveys and inspections.
  The total cost of all work on this improvement for the year was
$248,398.15, all for maintenance. The total expenditures were $248,-
667.80.
   Condition at end of fiscal year.-The channel dredging is about
70 percent completed and the entire project about 90 percent com-
pleted. The sea-wall extension, with fill and pavement, was com-
pleted in 1926. The channel was completed from Fort Point Light
to Forty-third Street in the fiscal year 1929. To complete the exist-
ing project the uncompleted portion of the channel between Forty-
third Street and Fifty-seventh Street remains to be dredged, which
wbrk is contingent on the development of the water-front facilities
on the properties of the Chicago, Rock Island & Gulf Railway and
of other adjacent owners.
   The ruling depth in the channel on June 30, 1934, was about 321/2
feet at mean low tide for a least width of 1,000 feet.
   The total cost of the existing project to June 30, 1934, has been
as follows:

                                                            New work         Maintenance          Total

United States:
   Channel             _                                    ,.610, 874. 19 $3, 194, 082. 67    $4, 804, 956. 86
   Seawall_                                                2, 300, 589. 49                      2, 300, 589. 49
     Total United States funds__                           3, 911, 463. 68   3, 194, 082. 67    7, 105, 546. 35
Contributed funds...-----------                               710, 274. 77                         710, 274. 77
     Total ---------        ----------------------------   4, 621, 738. 45   3, 194, 082. 67    7, 815, 821. 12


  The total expenditures on the existing project have been $7,154,-
638.41. In addition, $710,274.77 was expended from contributed
funds for sea-wall construction.
  Proposed operatiorts.-The balance unexpended and accounts re-
ceivable July 1, 1934, amounting to $81,702.54, will be applied during
the fiscal year 1935, as follows:
                RIVERS AND HARBORS-GALVESTON,                                   TEX.1 DISTRICT                          671
Accounts payable June 30, 1934_-__ ___-                  -   -_______________--
                                                                           $369. 69
Maintenance :
    Dredging of channel by contract (February to
      May 1935) ---      ---------------------------       $72, 800. 00
    Maintenance of sea-wall extension slope and paving
      by hired labor with Government plant (July
      1, 1934,, to June 30, 1935) ----------------------      5, 032. 85
    Operation of dragline machine constructing levees
      for dredging by hired labor and Government plant_       3, 500. 00
                                                                         81, 332. 85

            Total--         -------------------------------------------                                          81, 702. 54
   The additional sum of $200,000 can be profitably expended during
the fiscal year 1936, as follows:
Maintenance dredging of the channel by contract (February to
May 1936)     -----------------------------------              ----- $190, 000
Maintenance of sea-wall extension slope and paving by hired labor and
Government plant (July 1, 1935, to June 30, 1936)--------------10, 000

            Total      -----------------------------------------------                                             200, 000

                                      Cost and financial summary
Cost of new work to June 30, 1934_            -                                                         $3, 911, 463. 68
Cost of maintenance to June 30, 1934 ___-------------__                                         .__-     3, 194, 082. 67
      Total cost of permanent work to June 30, 1934 _________ 7, 105, 546. 35
Value of plant, materials, etc, on hand June 30, 1934- ---------- 49, 173. 81

      Net total cost to June 30, 1934      ---------------------- 7, 154, 720. 16
                                      .....
Plus accounts receivable June 30, 1934_-----        ---------- _          287. 94

     Gross total costs to June 30, 1934____ ________------                                                  7, 155, 008. 10
Minus accounts payable June 30, 1934___.________----- ------                                                        369. 69

                                          --
     Net total expenditures_______________-----                                                         1   7, 154, 638. 41
Unexpended balance June 30, 19341 1111111111-------                                   --1               1       81, 414. 60

            Total amount appropriated to June 30, 1934 ____________                                         7, 236, 053:01

            Fiscal year ending June 30               1930           1931            1932               1933           1934

Cost of new work...------------------
Cost of maintenance------                        $-----------
                                                $214,   219. 64 $142, 608. 95   $198, 247. 46     $15, 623. 05     $248, 398. 15

Total expended--_--------_------------            159, 016. 63   221, 110. 37    214, 458. 63 -94, 169. 84          248, 667. 80
Allotted        ...-----.------------------      200, 000. 00   200, 000. 00 -15, 000. 00        119, 721. 40      103, 831. 61


Balance unexpended July 1, 1933 ___-__-    -       -__       ___-$226, 250. 79
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934_______________________ $73, 500.00
Amount allotted from War Department Appropriation
                                --
Act approved July 14, 1932_____________             32, 250. 00
                                                                  105, 750. 00
       Amount to be accounted for__ ____----    ---------------                                                332, 000. 79
Deductions on account of revocation of allotment__-------------_                                                1, 918. 39
            Net amount to be accounted for --- _---------_________                                             330, 082. 40

    'Exclusive of $719,274.77 expended from contributed funds.
         91536-ENO 1934-      43
672       REPORT         OF CHIEF OF ENGINEERS,           U.   S.   ARMY,   1934

Gross amount expended------------------------ $253, 559.29
Less reimbursements collected--------------------- 4, 891. 49
                                                                             $248, 667. 80

      Balance unexpended June 30, 1934----------------------                    81, 414. 60
Outstanding liabilities June 30, 1934----------------------------                   378. 18

     Balance available June 30, 1934      ---        -----                      81, 036. 42
Acoounts receivable June 30, 1934------------------------------                     287.94

        Unobligated balance available June 30, 1934---------_                      81, 324. 36

Amount (estimated) required to be appropriated for completion of
  existing project-------------------------------------                      1, 430, 000. 00

Amount that can be profitably expended in fiscal year ending
                                1
June 30, 1936, for maintenance -_ _-_--
                                    _-   --           ___                      200, 000. 00

  5. CHANNEL FROM                   GALVESTON HARBOR TO TEXAS CITY, TEX.

   Location.-Texas City is on the mainland of Texas on the west side
of Galveston Bay, about 71/2 miles northwest of the city of Galveston.
 (See U. S. Coast and Geodetic Survey Charts Nos. 520 and 1282.)
   Previous projects.-Adopted by River and Harbor Act approved
March 3, 1899, and enlarged by River and Harbor Act approved June
25, 1910 (H. Doc. No. 328, 61st Cong., 2d sess.). The cost and ex-
penditures prior to the beginning of the present project in 1913 were
$561,905.69, of which $366,822.48 was for new work and $195,083.21
was for maintenance.              (For further details see p. 1856, Annual
Report for 1915.)
   Existing project.-This provides for a channel 30 feet deep at mean
low tide and 300 feet wide on bottom from deep water in Galveston
Harbor to the harbor at Texas City, a distance of about 7 miles, with
J pile dike on its north side 28,200 feet long covered with clay and
other material dredged from the channel, with a harbor 800 feet wide
on bottom and 30 feet deep at mean low tide extending from a point
1,000 feet to the southward of the present oil pier to the south prop-
erty line of the Texas Sugar Refining Co., and for the construction of
a rubble-mound dike a short distance south of the existing pile dike
and extending between stations 4+000 and 26+000 of that dike.
Under ordinary conditions the mean tidal range is about 11/4 feet
and the extreme range is about 1/2 feet. The height of tide is
dependent largely on the wind, and during strong "northers" in
the winter season the water surface may be depressed 2 feet below
mean low tide.
   The estimate of cost for new work, revised in 1930, is $1,890,000,
exclusive of amounts expended on previous projects, of which $49,450
was contributed by local interests. The latest (1930) approved esti-
mate for annual cost of maintenance of the channel and dike is
$161,500.
   The existing project was adopted by the River and Harbor Act of
March 4, 1913 (H. Doc. No. 1390, 62d Cong., 3d sess.), which pro-
vided for all features of the project except the southerly extension of
the harbor and the rubber-mound dike, these latter works being au-
thorized by the River and Harbor Act of July 3, 1930 (H. Doc. No.
107, 71st Cong., 1st sess.). The latest published maps are in the last-
   1Exclusive of available funds.
            RIVERS AND HARBORS-GALVESTON,                              TEX.,        DISTRICT                 673

mentioned document and in Rivers and Harbors Committee Docu-
ment No. 4, Seventy-third Congress, first session.
   Supplementing the work authorized by Congress the extension of
the rubble-mound dike to shore, at an estimated cost of $219,000,
as recommended by the Chief of Engineers in Rivers and Harbors
Committee Document No. 4, Seventy-third Congress, first session,
was included in the Public Works program under the National
Industrial Recovery Act.
   Recommended modifications of project.-Under date of June 15,
1934, the Chief of Engineers recommended modification of the ex-
isting project so as to authorize a depth of 32 feet throughout, at an
estimated cost of $80,000, with no increase in the annual cost of
maintenance. (Rivers and Harbors Committee Doc. No. 46, 73d
Cong., 2d sess.).
   Local cooperation.-Fully complied with.
   Terminal facilities.-Modern terminal facilities are located on the
mainland at the inner end of this channel and are considered ade-
quate for existing commerce. (See Port Series No. 6, pt. 3, revised
1928, Corps of Engineers.)
                   OPERATIONS AND RESULTS DURING FISCAL YEAR

  Project authorized by FederalEmergency Administration of Pub-
lio Works.-New work: The rubble-mound dike was extended to the
shore line under contract between November 14, 1933, and February
19, 1934. A total of 5,600 linear feet of dike was constructed. A
total of 31,478.75 tons of stone were placed, at a total cost of
$136,295.78.
   Existing project-Maintenace.-Miscellaneoussurveys and in-
spections were made at a cost of $3,455.16.
   Total cost of all work on this improvement for the year was
$139,750.94, of which $136,295.78 was for new work from Public
Works funds and $3,455.16 was for maintenance from regular funds.
   The total expenditures were $140,092.98, including $136,295.78
from Public Works funds.
   Condition at the end of the fiscal year.-The existing project is
completed. The channel was completed in 1916, the harbor in 1931.
The pile dike was completed in 1915 and the rubble-mound dike
in 1932.
   In addition to the above, the project authorized by the Public
Works Administration was completed in 1934.
   The ruling depth on June 30, 1934, was about 301/2 feet at mean
low tide.
   The total cost of the existing and Public Works Administration
projects to June 30, 1934, were as follows:

                                                                   New work         Maintenance          Total


Regular funds______ _______ __________ ___________________   $2, 028, 766. 48 $2, 733, 349. 17        $4, 762, 115. 65
Public Works funds __________. _____________________________     136, 295 78                  _           136, 295. 78
      Total United States funds_                                  2, 165, 062. 26   2, 733, 349. 17    4, 898, 411. 43
Contributed funds__________________________________                 28, 740. 68                           28, 740. 68
      Total (all funds)                                           2, 193, 802. 94   2, 733, 349. 17    4, 927, 152. 11
674         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

  The total expenditures on the existing project have been $4,761,-
967.49 from regular funds and $28,740.68 from contributed funds.
  The total expenditure on the project authorized by the Public
Works Administration was $136,295.78 from Public Works funds.
  Proposed operations.--The balance unexpended July 1, 1934,
amounting to $126,954.87, will be expended during the fiscal year
1935 as follows:
Accounts payable June 30, 1934------------------------------       $148. 16
Maintenance: Dredging of channel by contract, July 1934 to De-
  cember 1934 ------------------    --------- --------------   126, 806. 71

         Total-----------------                                 ------------------------- 126, 954. 87
  The additional sum of $160,000 can be profitably expended during
the fiscal year 1936 in maintenance dredging of the channel and
harbor, July to December 1935.
                                      Cost and financial summary
                                MAINTENANCE           AND IMPROVEMENT               FUNDS

Cost of new work to June 30, 1934 1------------                ---                                      $2, 395, 588. 96
Cost of maintenance to June 30, 1934      -----------------------                                        2, 9128, 432. 38
      Total cost of permanent work to June 30, 1934----------   5, 324, 021.34
Minus accounts payable June 30, 1934 --------------------------         148. 16
     Net total expenditures 1------------5,                                                                  323, 873.18
Unexpended balance June 30, 1934--------------------------                                                   126, 954. 87
         Total amount appropriated to June 30, 1934-------------                                          5, 450, 828. 05

         Fiscal year ending June 30                      1930           1931           1932           1933         1934


Cost of new work  _____________                    ____-$104,             559. 66 $740, 182. 91
Cost of maintenance---__----- -                   _ $266, 427. 89    161, 034. 58   65, 688. 62 $133, 571.47      $3, 455. 16
      Total cost--------        ------------          266, 427. 89   265, 594. 24   805, 871. 53   133, 571. 47    3, 455. 16
Total expended- __-----             __._
                                       .-------      236, 348. 83    233, 678. 01   799, 729. 09   96, 792. 83     3, 797. 20
Allotted_-----___          __
                     --------         . -___-__       155, 000. 00   475, 525. 00   426, 000. 00   61, 664. 17    81, 638. 88


Balance unexpended July 1, 1933---------------------------- $49, 113. 19
Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934-------      ------------------------------------88, 800. 00
     Amount to be accounted for--            ------------------   37, 913.19
                                                                 1-----
Deductions on account of revocation of allotment----------------    7, 161. 12

      Net amount to be accounted for------------------------130,    752. 07
Gross amount expended--------------      ---------------------   3, 797. 20
      Balance unexpended June 30, 1934--------------------- 126, 954. 87
Outstanding liabilities June 30, 1934 ---------------------------- 148. 16
         Balance available June 30, 1934-------------------------- 126, 806. 71

Amount that can be profitably expended in fiscal year ending June
                             - - - -- - - -- - - - - - - - - - - - - - - -- - - -
30, 1936, for maintenance 2                                                      160, 000. 00

   1 In addition $28,740.68 was expended from contributed funds.
    SExclusive of available funds.
                   RIVERS AND HARBORS-GALVESTON,                                               TEX.,     DISTRICT                 675
                                                 PUBLIC WORKS FUND

    Cost of new work to June 30, 1934__.____      _____   _______ $136, 295. 78
    Cost of maintenance to June 30, 1934_-
          Total cost of permanent work to June 30, 1934 ____--__-  136, 295. 78
    Net total expenditures                                               295. 78
                                                                   1-------------------------------
    Total amount appropriated to June 30, 1934 _________________ 136, 295. 78

              Fiscal year ending June 30                    1930                1931              1932           1933           1934


    Cost of new work----------                  -------------------------------------------- $136, 295. 78
    Cost of maintenance----------------------                        --------------------                                    --------

    Total expended-----                              --------------------                                                     136, 295.78

    Allotted--------      -------------------- ------------                                 ------------------------ 136, 295. 78


    Amount allotted from National Industrial Recovery Act approved
      June 16, 1933    ----------------------------------------     $219, 000. 00
    Deductions on account of revocation of allotment------------___   82, 704. 22
          Net amount to be accounted for--------------------- __ _                                                       136, 295. 78
    Gross amount expended ____________      ___      ___ $136, 338.55
    Less reimbursements collected _---__-       ______-         42. 77
                                                                                                                         136, 295. 78
    CONSOLIDATED COST AND FINANCIAL SUMMARY FOR CHANNEL FROM GALVESTON                                                            HAR-
                            BOR TO TEXAS CHANNEL, TEX.

-   Cost of new work to June 30, 1934_____                                                               $2, 531, 884. 74
                                                                                            .____________1
    Cost of maintenance to June 30, 1934                                                                     928, 432. 38
                                                                                                          2-----------------------,
          Total cost of permanent work to June 30, 1934----------5, 460, 317. 12
    Minus accounts payable June 30, 1934______     _________-----148.    1    16

         Net total expenditures__________--_________           15, 460, 168. 96
    Unexpended balance June 30, 1934--------------------------     126, 954. 87

              Total amount appropriated to June 30, 1934.----------- 5, 587, 123. 83

              Fiscal year ending June 30                 ' 1930                 1931             1932            1933           1934


    Cost of new work.-----------------------------$104, 559. 66 $740, 182. 91 -----------
                                                                                    _                                        $136, 295. 78
    Cost of maintenance_            _     $266, 427. 89 161, 034. 58 65, 688. 62 $133, 571. 47                                  3, 455. 16

          Total cost-    --------------------         266, 427. 89          265, 594. 24      805, 871. 53   133, 571. 47     139, 750. 94

    Total expended---------------------- 236, 348. 83                       233, 678. 01      799, 729. 09     96, 792. 83    140, 092. 98

    Allotted ----------------------------------       155, 000. 00          475, 525. 00      426, 000. 00     61, 664. 17    217, 934. 66


    Balance unexpended July 1, 1933                                     $49, 113. 19
    Amount allotted from War Department Appropriation
      Act approved Apr. 26, 1934_ .-        ___.-- ___ ___ $88, 800. 00
    Amount allotted from National Industrial Recovery
      Act approved June 16, 1933     ___-----              219, 000. 00
                                                                        307, 800. 00

          Amount to be accounted for_          ______-------------   356, 913.19
    Deductions on account of revocation of allotment---------------89, 865. 34

              Net amount to be accounted for ________                                          _____--------             267, 047.85

       1 In   addition $28,740.68 was expended from contributed funds.
676      REPORT      OF CHIEF       OF ENGINEERS,   U.       S. ARMY,     1934

Gross amount expended___________--______--                    $140, 135. 75
Less reimbursements collected ---_--  -
                                     __-- --             _           42. 77
                                                                              $140, 092. 98
      Balance unexpended June 30, 1934_________________________ 126, 954. 87
Outstanding liabilities June 30, 1934_ -   -_____-__-______________ 148. 16
       Balance available June 30, 1934_________________________                126, 806.71
Amount that can be profitably expended in fiscal year ending June
  30, 1936, for maintenance 1__________________                                160, 000.00

                    6. CHANNEL TO PORT BOLIVAR, TEX.

   Location.-Port Bolivar is at the end of Bolivar Peninsula, which
is on the east coast of Texas, between the Gulf of Mexico and
Galveston Bay. It is on Galveston Harbor and about 4 miles north
of the city of Galveston. (See U. S. Coast and Geodetic Survey
Chart No. 520.)
   Previous projects.-Adopted by the River and Harbor Act ap-
proved March 2, 1907. The cost and expenditures were $94,811.50,
of which $48,710.75 was for new work and $46,100.75 for maintenance.
For further details see page 1856, Annual Report for 1915.
   Existing projet.-This provides for a channel 30 feet deep at
mean low tide and 200 feet wide on bottom, beginning at deep water
in Galveston Harbor and extending to a turning basin 1,600 feet
long, with an average width of about 750 feet and 30 feet deep at
mean low tide in front of the wharves. Under ordinary conditions
the mean tidal range is about 1.7 feet and the extreme range about
2.3 feet. The height of tides is dependent largely on the wind, and
during strong "northers" in the winter season the water surface
may be depressed 2 feet below mean low tide.
   The estimated cost of new work, revised in 1928, is $187,000, exclu-
sive of amount expended on previous projects. The latest (1928)
approved estimate for annual cost of maintenance of the channel
and turning basin is $20,000, which provides for a depth of 20 feet
in the channel and 20 feet in the turning basin, 500 feet square,
these dimensions being sufficient for the operations of the railway
ferry and occasional small lumber schooners which use the port.
   The existing project was adopted by the following river and
harbor acts: The act of June 25, 1910, provided for all except the
present dimensions of the turning basin (H. Doc. No. 328, 61st Cong.,
2d sess.), and the act of March 2, 1919, provided for the present
dimensions of the turning basin (H. Doc. No. 1122, 65th Cong., 2d
sess.). The latest published map is in the last-mentioned document.
   Recommended modifications of project.-Under date of June 24,
1926, the Chief of Engineers recommended that the project be cur-
tailed by providing for a channel depth of 20 feet, 200 feet wide, with
a turning basin of the same depth 500 feet square (H. Doc. No. 467,
69th Cong., 1st sess.).
   Terminal facilities.-The terminals consist of two piers, one 400
feet wide by 1,200 feet long and the other 1,200 feet long by 210
feet wide. The facilities are considered adequate for the existing
commerce.
  1 Exclusive of available funds.
                RIVERS AND HARBORS-GALVESTON                                   TEX.,         DISTRICT             677
    Operations and results during fiscal years-Maintenance.--The
turning basin in front of slip no. 3 was redredged to a width of 500
feet and a depth of 25 feet by U. S. dredge Sam Houston between
October 17 and 28, 1933. Total cubic yards of silt and sand re-
moved, 142,660. The cost of this dredging was $7,434.15. The cost
of miscellaneous surveys and inspections was $130.36. Total cost
during the fiscal year was $7,564.51, all for maintenance. The total
expenditures were $7,649.19.
    Condition at end of fiscal year.--The existing project is about 90
percent complete. The channel, 200 feet wide, and turning basin,
1,000 feet square, were completed in 1912. To complete the project,
the change in the turning basin called for in the revised project
remains to be dredged. This change has not been made for the rea-
son that there is no demand for a turning basin of those dimensions.
Constant shoaling occurs and the project dimensions have been only
partly maintained, as greater depth than the 20 feet now dredged is
not demanded by shipping.
    The ruling depth on June 30, 1934, was 21 feet in the channel and
15 feet at mean low tide in the turning basin at the entrance to
slip no. 3.
    Total cost of the existing project to June 30, 1934, was $540,104.67,
of which $85,213.85 was for new work and $454,890.82 was for main-
tenance. The total expenditures were $540,104.67.
    Proposed operations.-The balance unexpended July 1, 1934,
amounting to $16,650. 81, will be applied during the fiscal year 1935
for maintenance dredging in the channel and parts of the turning
basin to 20-foot depth by United States pipe-line dredge or by
contract (October and November 1934).
    The additional sum of $24,000 can be profitably expended during
the fiscal year 1936, to be applied to dredging in the channel and basin
to 20-foot depth during July and August 1935. It is not proposed
to maintain full project dimensions for the reason that lesser depth
and width are sufficient for commerce at this port.
                                          Cost and financial summary

Cost of new work to June 30, 1934-------------------------   $133, 924. 60
Cost of maintenance to June 30, 1934------------------------ 500, 991. 57

          Total cost of permanent work to June 30, 1934                                                        916. 17
                                                                                                         6------------34,

Net total expenditures__-------------------- ---------------                                             634, 916. 17
Unexpended balance June 30, 1934---------------------------                                               16, 650. 81

          Total amount appropriated to June 30, 1934                                                      51, 566. 98
                                                                                                         6--------------

          Fiscal year ending June 30                1930           1931          1932            1933          1934


Cost of new work ..----
Cost of maintenance..... ------------------      $13, 336. 67
                                                                  --
                                                                $17, 451. 66   $7, 514. 39    $22,863.42      $7, 564. 51

Total expended-...........................        13, 399. 49    17, 077. 76    7, 829. 45     22, 922. 26     7, 649. 19
Allotted --......---------------------___         16, 250. 00    24, 000. 00 -20, 000. 00      39, 822. 70      -85. 72
678      REPORT     OF CHIEF OF ENGINEERS, U.              S. ARMY,     1934

Balance unexpended July 1, 1933    ----------------------------             $24, 385. 72
Deductions on account of revocation of allotment------------                      85. 72

      Net amount to be accounted for ------------------------                24, 300. 00
Gross amount expended----------- -------------------------                    7, 649. 19

      Balance unexpended June 30, 1934---------------------                  16, 650. 81

Amount (estimated) required to be appropriated           for completion of
                  - - - - -- --- ---- ---- ----- ----- ---- ----- -     - -
existing project                                                           102, 000. 00

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1------------------                               24, 000. 00

                      7. HOUSTON SHIP CHANNEL, TEX.

   Location.-The channel connects Galveston Harbor, at a point
opposite Port Bolivar, with the city of Houston, Tex., extending 50
miles in the northwesterly direction across Galveston Bay through
the San Jacinto River and Buffalo Bayou to a turning basin at the
head of Long Reach with a light-draft channel 7 miles long from the
turning basin to Main Street, Houston. (See U. S. Coast and Geo-
detic Survey Charts Nos. 1282 and 532.)
   Previous projects.-Authorized by acts of June 10, 1872; 1877,
March 3, 1879, March 3, 1899, February 20, 1900, March 3, 1905,. and
March 4, 1913. The cost and expenditures were (including the pur-
chase of the Morgan cut and canal), $5,308,739.27, of which $4,105,-
156.87 was for new work and $1,203,582.40 was for maintenance. In
addition to these amounts $1,409,178.78 was expended from con-
tributed funds, $1,209,178.78 being for new work and $200,000 for
maintenance. (For further details see p. 1856 of the Annual Report
for 1915.)
   Existing project.-This provides for a channel 30 feet deep at
mean low water, 250 feet wide across Galveston Bay to and through
Morgan Point to the upper end of Morgan cut, thence with a general
width of,200 feet through San Jacinto River to a point 4,000 feet
above Baytown, thence 150 feet wide through San Jacinto River and
Buffalo Bayou to head of Long Reach where it ends in a turning
basin about 1,000 feet wide and 30 feet deep, and for widening the
bends at Lynchburg, Norsworthy, Manchester, and Harrisburg. The
project also provides for suitable widening of the channel in front
of the wharf at Manchester, for certain cut-offs and easing of sharp
bends, for the construction of a dike 26,000 feet long to protect the
channel in upper Galveston Bay, and for a light-draft extension of
the channel, 10 feet deep at mean low water and 60 feet wide, without
easing the bends, through Buffalo Bayou from the turning basin to
the mouth of White Oak Bayou in Houston, Tex.
   The mean tidal range under ordinary conditions is about 1.3 feet
in the lower part of Galveston Bay, 0.6 foot in the upper bay, and
less than 0.5 foot in the San Jacinto River and Buffalo Bayou. The
extreme ranges under ordinary conditions are about 1.6 feet, 1.3 feet,
and 1 foot, respectively. Freshets sometimes cause rises of over 12
feet in Buffalo Bayou. The height of the tides, however, is depend-
ent largely on the wind, and during strong " northers " in the winter
season the water surface may be depressed 2 feet below mean low
tide.
  1Exclusive of available funds.
         RIVERS AND   HARBORS-GALVESTON,      TEX.,   DISTRICT   679
  The estimate of cost for new work, revised in 1930, is $7,082,000,
exclusive of amounts expended on previous projects, but inclusive
of $1,365,000 contributed by local interests. The latest (1930)
approved estimate for annual cost of maintenance is $550,000.
  The existing project was adopted by the following river and har-
bor acts: The act of March 3, 1905, provided for the easing or cut-off
of sharp bends and the construction of the pile dike (Rivers and
Harbors Committee Doc. No. 35, 61st Cong., 2d sess.) ; the act of
March 2, 1919, provided for the 30-foot channel, the widening at
Manchester, and the present dimensions of the turning basin (H. Doc.
No. 1632, 65th Cong., 3d sess.); the act of March 3, 1925, provided
for the light-draft extension of the channel to the mouth of White
Oak Bayou (H. Doc. No. 93, 67th Cong., 1st sess.); and the act of
July 3, 1930, provided for widening the channel through Morgan
Point and to a point 4,000 feet above Baytown and for widening cer-
tain bends (H. Doc. No. 13, 71st Cong., 1st sess.). The latest pub-
lished maps are in the last-mentioned document and Rivers and
Harbors Committee Document No. 28, Seventy-second Congress,
first session.
   Supplementing the work authorized by Congress, the modification
of the project to provide a channel 32 feet deep from deep water in
Galveston Bay to and including the Houston turning basin with a
width of 400 feet through Galveston Bay, 300 feet in the cut through
Morgan Point, 200 feet thence to a point 4,000 feet above Baytown,
and 150 feet thence to the turning basin, suitably widened at the
bends, as recommended by the Chief of Engineers in Rivers and
Harbors Committee Document No. 28, Seventy-second Congress, first
session, was included in the Public Works program under the
National Industrial Recovery Act.
   Recommended modiflcations of project.-Included under Public
Works program.
   Local cooperation.-The work included under the Public Works
program is subject to the provision that local interests shall furnish
free of cost to the United States suitable areas for the disposal of
dredged material during initial construction and for future mainte-
nance as and when needed. These conditions have not yet been com-
plied with, but it is understood that they will be promptly complied
with when disposal areas on land are needed. All cooperation re-
quired under prior acts has been fully complied with.
   Terminal facilities.-The city of Houston and the Harris County
Houston Ship Channel navigation district have constructed modern
terminals which supplement privately owned wharves.
   The existing facilities serve existing commerce. Plans are said to
be in preparation to extend the facilities as rapidly as commerce jus-
tifies and funds are available. (See Port Series No. 6, Corps of
Engineers.)
             OPERATIONS AND RESULTS DURING FISCAL YEAR

  Project adopted by Congress--New work.-Under contract, the
widening or easing of the bend at Harrisburg was completed and
work was begun on the easing at Manchester. About 1,000 linear
feet of the upper end of the Manchester easing had been completed
when the contractor stopped work on July 14. A total of 104,746
680    REPORT   OF   CHIEF   OF ENGINEERS,   U.   S.   ARMI\Y,   1934


cubic yards of material was removed in all this work at a cost of
$10,117.66.
   Between July 1 and 31 the U. S. derrick barge No. 8 was engaged
in removing a ledge of rock from the Harrisburg bend widening
which the contractor's dredge was unable to remove and which he
was permitted to leave unexcavated. A total of 453 cubic yards of
rock, clay, and sand was removed at a cost of $3,623.31, completing
this work. Total cost of all new work for the year prosecuted with
regular funds was $13,740.97.
   Maintenance.-During the year maintenance dredging was done
by the U. S. pipe-line dredges Raymond and Sam Houston. The
Raymond between June 25 and 30 redredged 600 linear feet of the
section of the channel at the Baytown curve to remove shoaling on
the west side of the channel, excavating 28,000 cubic yards of sand
and silt. The Sam Houston between November 1 and December 31
redredged 3,300 linear feet of the channel beginning at Morgan
Point and extending upstream, removing 337,851 cubic yards to 3'5
feet below mean low tide; also between July 1 and September 22
and between January 1 and February 19 redredged the existing
channel in lower Galveston Bay between beacons 3 and 4 and the
first turn above Bolivar Roads covering a total distance of about
15,780 feet and removing a total of 456,950 cubic yards of material.
Total cubic yards removed in all this maintenance dredging 822,801.
Total cost $106,525.31.
   The U. S. derrick barge No. 8, between August 1 and 9, removed a
few snags, logs, and other obstructions from waters adjacent to the
channel and cleaned up the banks of the waterway of logs, over-
hanging trees, etc., at a cost of $1,529.79. There were additional
costs amounting to $10,411.40 for miscellaneous surveys, inspections,
building levees, preparing dumping grounds, etc.
   The total cost of all maintenance work from regular funds was
$118,466.50.
   Project authorized by Federal Emergency Administration of Pub-
lio Works-New work.-Under the Public Works program, work was
prosecuted under two contracts for the widening to 400 feet on
bottom and deepening to 32 feet at mean low tide, plus 3 feet over-
depth, of that part of the channel through Galveston Bay from the
first turn above Bolivar Roads (station 129) to station 29 at about
the first turn below Morgan Point, a total distance of about 19 miles.
Work was begun on the contract extending from station 129 to Red
Fish Reef on October 12 and to the end of the fiscal year 38,400
linear feet of the channel had been completed from Red Fish Reef
south and 7,010,646 cubic yards of material removed. Work was
begun on the contract extending from Red Fish Reef to station 29
on October 21 and to the end of the fiscal year 33,070 linear feet of
the channel had been completed from Red Fish Reef north and
7,323,903 cubic yards of material removed. Total length of channel
completed 71,470 feet. Total cubic yards removed 14,334,549. Total
cost $1,097,408.89. The cost of miscellaneous surveys for the year
was $1,613.25.
    Under contract a small concrete field office building was con-
structed at Houston between October 18 and January 22 for this
channel at a cost of $18,123.86, including $578.37 for sewer, walks,
etc., done by Government hired labor.
                RIVERS AND HIARBORS-GALVESTON,                                   TEX., DISTRICT                         681
   Total cost of all work for the year, prosecuted with Public Works
funds, was $1,099,022.14. Total expenditures were $902,949.90.
   The total cost of all work on this improvement for the year was
as follows:

                                                                          New work         Maintenance            Total

Regular funds        _______-                      -
                                   _____________________   --               $13, 740. 97     $118, 466. 50      $132, 207. 47
Public Works funds____________________________          ______          1, 099, 022. 14                       1, 099, 022. 14

       Total_                                                            1, 112, 763. 11      118, 466. 50     1, 231, 229. 61



    The total expenditures were $1,286,215.23, including $902,949.90
from Public Works funds.

                              CONDITION AT END OF FISCAL YEAR

   Project adopted by Congress.-The existing project is about 93
percent completed. The entire ship channel, including the widening
in front of the wharf at Manchester, has been completed to existing
project dimensions except for the widening of the bend at Manchester
and the completion of the widening of the bend at Norsworthy and
the dredging of a small area in the extreme end of the southwest
extension of the turning basin. To complete the existing project
the uncompleted portion of the turning basin, the widenings referred
to above, and the light-draft extension of the channel above the
turning basin are to be dredged, and the dike, 26,000 feet long, to
protect the channel in upper Galveston Bay is to be completed. A
side or tributary channel, 10 to 12 feet deep and 3,700 feet long, has
been excavated from the ship channel to the mouth of Goose Creek.
   Project authorized by Public Works Administration.-This project
is about 50 percent completed. A total of about 131/2 miles of the
25-mile length of the channel across Galveston Bay has been com-
pleted to the new dimensions provided by this modified project. To
complete this project the remainder of the channel across Galveston
Bay and the cut through Morgan Point are to be widened and deep-
ened and the channel from Morgan Point to and including the
turning basin is to be deepened.
   The ruling depths at mean low tide along the center line of the
channel on June 30, 1934, were as follows: Through Galveston Bay,
31 feet; thence to mouth of Vinces Bayou, 27 feet; thence to the
turning basin, 30 feet, with 30 to 35 feet in the turning basin; thence
to Houston, 3 feet. The ruling depth in the channel to mouth of
Goose Creek was about 6 feet.
   The total cost of all work on this improvement to June 30, 1934,
was as follows:

                                                                         New work          Maintenance          Total

Regular funds-. .--    -   ------------------------------.. $5, 192, 126. 66 $5, 865, 480. 18 $11, 057, 606. 84
Public Works funds                                         ....---       1,099, 022. 14---                    1, 099, 022. 14
     Total, United States funds-- - -------.-                            6,291, 148.80 5, 865, 480. 18       12, 156, 628. 98
Contributed funds-- -----..........-----                                 1,365, 000. 00---------              1, 365, 000. 00
      Total, all funds-----..-------------------       -- -          -- 7,656, 148. 80     5, 865, 480. 18   13, 521, 628. 98
682     REPORT OF CHIEF OF ENGINEERS,                  U. S. ARMY,   1934

  The total expenditures on the improvement have been $13,598,-
237.60, including $902,949.90 from Public Works funds.               In addition,
$1,365,000 was expended from contributed funds.
  Proposedoperations.-The balance unexpended, including accounts
receivable July 1, 1934, amounting to $429,266.88, will be applied as
follows :
Accounts payable June 30, 1934 .......-                           $37, 650. 99
Maintenance:
    Dredging by United States plant or by contract
      to remove shoaling in channel and turning basin
       (between July 1, 1934, and June 30, 1935)---- $380, 000.00
    Building levees and preparing dumping grounds
      for United States plant (between July 1, 1934,
      and June 30, 1935) --------------------------    11,615.89
                                                                  391, 615. 89

        Total    -------------------------------------------            429, 266. 88
  The balance unexpended July 1, 1934, amounting to $597,050.10
from the funds allotted by the Public Works Administration, to-
gether with $1,043,000 allotted during July 1934, will be applied as
follows:
Accounts payable June 30, 1934______----                               $214, 196. 10
New work:
    Continuation of widening and deepening lower
      Galveston Bay section of channel between
      first turn above Bolivar Roads and Red Fish
      Reef by contract (between July 1, 1934, and
     October 1934) ------------------------------- $162, 781. 14
    Continuation of widening and deepening upper
      Galveston Bay section of channel from Red
      Fish Reef to and through Morgan Point by
      contract (between July 1, 1934, and April
      1935) --    --------------------------------  651, 072. 86
    Widening and deepening by United States hopper
      dredge lower Galveston Bay section of channel
      between Bolivar Roads and first turn (be-
      tween July 1, 1934, and June 1935) ---------- 50, 000.00
    Completion of remainder of project as far as
      funds will permit by deepening channel above
      Morgan Point-----------------_                562, 000. 00
                                                                      1 425. 854 00

        Total-   ----------    ---------------------                  1, 640, 050. 10
  The additional sum of $709,250 can be profitably expended during
the fiscal year 1936, as follows:
Maintenance:
   Removal of shoaling from the turning basin and ship channel by
      the operation of one United States pipe-line dredge and booster
      when required, or by contract (between July 1, 1935, and June
      30, 1936) ---------------------------------------        ----- $700, 000
   Building levees and preparing dumping grounds for United States
      plant (between July 1, 1935, and June 30, 1936) --------------    9, 250

        Total---------------   ------------------------------------         7091, 250
                RIVERS AND HARBORS-GALVESTON,                                       TEX., DISTRICT                          683
                                             Cost and finawcial summary
                                  MAINTENANCE AND IMPROVEMENT                        FUNDS

Cost of new work to June 30, 1934 1_______-------------__                                                 $9, 297, 283. 53
Cost of maintenance to June 30, 1934 ____-___----_7,                                                          069, 062. 58
      Total cost of permanent work to June 30, 1934 .- ____---  16, 366, 346. 11
Value of plant, materials, etc., on hand June 30, 1934------   - 1, 625, 142. 65

      Net total cost to June 30, 1934 _____-...    __________-    17, 901, 488. 76
Plus accounts receivable June 30, 1934 .----------         .-------- 50, 189. 20
     Gross total costs to June 30, 1934______________________--                                            18,041, 677. 96
Minus accounts payable June 30, 1934_ .-.--      ----------                                                  - 37, 650. 99
     Net total expenditures 1----                                      ----              -        -        18, 004, 026. 97
Unexpended balance June 30, 1934__ --                               ___--___--______                           379, 077. 68
           Total amount appropriated to June 30, 1934__________                                            18, 383, 104. 65

    Fiscal year ending June 30                   1930           1931              1932                1933                1934


Cost of new work.___............$34,116. 45                 _                  $209, 437.51      $312, 723.43         $13, 740. 97
                              1, 249, 853.08
Cost of maintenance-.............                            $335, 871. 60      519, 683. 71       58, 658. 82        118, 466. 50

        Total cost-------------- 1, 283, 969. 53              335,871. 60       729, 121. 22      371, 382. 25        132,207. 47
Total expended.....--.........------------   1,302,116.96     357, 628. 41      568, 324.58       912, 783.83         383,265. 33

                                    000. 00
Allotted_.---------------------. 650,                         814, 000. 00    -190, 000. 00     1, 160, 154. 47       224, 287. 08


Balance unexpended July 1, 1933_                                                                                  $538, 055. 93
Amount allotted from War Department Appropria-
tion Act approved Apr. 26, 1934____---                                                $133, 000. 00
Amount allotted from War Department Appropria-
tion Act approved July 14, 1932___------                                                487, 752. 79
Amount allotted from War Department Appropria-
tion Act approved Mar. 4, 1933---------------                                               25, 000. 00
                                                                                                                   645 752
                                                                                                                   vZv,
                                                                                                                            79
                                                                                                                         .....


      Amount to be accounted for_______--- -----                                                             1, 183, 808. 72
Deductions on account of revocation of allotment __-------__--421,                                                   465. 71

      Net amount to be accounted for_                                                                              762, 343.01
Gross amount expended______________----___          1, 515, 881.84
Less:
    Reimbursements collected -------  $986, 707.29
    Receipts from sales__________---   145, 909. 22
                                                    1, 132, 616. 51
                                                                                                                   383, 265. 33

      Balance unexpended June 30, 1934_______                                                                      379, 077. 68
Outstanding liabilities June 30, 1934______________                                          60, 186. 83
Amount covered by uncompleted contracts---------                                             15, 000. 00
                                                                                                                    75, 186. 83

      Balance available June 30, 1934------------------------ 303, 890. 85
Accounts receivable June 30, 1934----------------------------50, 189. 20

           Unobligated balance available June 30, 1934--------------354, 080. 05

Amount (estimated) required to - be       appropriated for completion
                       - - - -- - -- -- - -- -- - - -- -- - -- - -- - -- - -- - -
of existing project 2                                                                                             480. 000. 00
Amount that can be profitably expended in fiscal year ending
                                     -- - - - - - - - - - - - - - - - - - - - - - - - - -
June 30, 1936, for maintenance 1                                                                                  709, 250. 00
   1 In addition $1,365,000 was expended from contributed funds.
   2 Exclusive of available funds.
684           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

                                               PUBLIC WORKS FUNDS

Cost of new work to June 30, 1934---------------------------                                   1, 099, 022. 14
Cost of maintenance to June 30, 1934 ............

      Total cost of permanent work to June 30, 1934 -----------  1, 099, 022. 14
Value of plant, materials, etc., on hand June 30, 1934----------     18, 123. 86
     Net total cost to June 30, 1934 -, _                   1, 117, 146. 00
Minus accounts payable June 30, 1934------------------------ 214, 196. 10

      Net total expenditures------------------------------902, 949. 90
Unexpended balance June 30, 1934--------------------------597, 050. 10

          Total amount appropriated to June 30, 1934------------- 1, 500, 000. 00

    Fiscal year ending June 30                 1930         1931          1932           1933            1934

Cost of new work........-------------------         --------------------------------           $1, 099, 022. 14
Cost of maintenance------------- -------------- --------------.. ---------------------------- --------------
Total expended----..........-------------------------------          ------------- --------------       902, 949.90

Allotted-----------..............-------.........     ---------------------....-------..---           1, 500,000.00


Amount allotted from National Industrial Recovery Act approved
  June 16, 1933--------_----------------------_------1,                                             500, 000. 00
Gross amount expended--------------------                  $903,029. 90
Less reimbursements collected----              -----------       80. 00
                                                                                                    902, 949. 90

      Balance unexpended June 30, 1934---------------------597, 050. 10
Outstanding liabilities June 30, 1934---------------   4, 081. 04
Amount covered by uncompleted contracts---------     586, 223. 29
                                                                  590, 304. 33

     Balance available June 30, 1934-------------------------   6, 745. 77
Amount allotted by Public Works Administration Emergency Ap-
propriation Act fiscal year 1935-------------------------1,  043, 000.00

          Balance available for fiscal year 1935--------------- --                              1, 049, 745. 77

CONSOLIDATED' COST AND FINANCIAL SUMMARY FOR HOUSTON                                 SHIP CHANNEL,          TEX.

Cost of new work to June 30, 19341--------------------- ----                                $10, 396, 305. 67
                                    ------------------------
Cost of maintenance to June 30, 1934__                                                          7, 069, 062. 58

      Total cost of permanent work to June 30, 1934---------17, 465, 368. 25
Value of plant, materials, etc., on hand June 30, 1934---------1, 643, 266 51

      Net total cost to June 30, 1934 ----------------------                                  19, 108, 634. 76
Plus accounts receivable June 30, 1934-----------------------                                      50, 189. 20

      Gross total costs to, June 30, 1934_-                 19, 158, 823. 96
Minus accounts payable June 30, 1934-----------------------     251, 847. 09
                                  --- ----- ----- ---- ----- ----- -
     Net total expenditures 1----                                    18, 906, 976. 87
Unexpended balance June 30, 1934--------------------------               976, 127. 78

         Total amount appropriated to June 30, 1934-----------19, 883, 104. 65

  1 In addition $1,365,000 was expended from contributed funds.
                  RIVERS AND HARBORS                               GALVESTON,             TEX.,      DISTRICT                   685

     Fiscal year ending June 30                     1930              1931             1932               1933               1934


Cost of new work____....__          __  $34, 116. 45
Cost of maintenance.......----------- 1,249, 853. 08
                                                                 -_.     .....
                                                                  $335, 871. 60
                                                                                    $209, 437. 51    $312, 723.43       $1, 112, 763. 11
                                                                                     519, 683. 71        58, 658.82         118, 466. 50
       Total cost.........-------------......   1,283, 969.53       335, 871. 60     729, 121. 22       371, 382. 25     1, 231, 229. 61
Total expended.--------------                   1,302, 116. 96      357, 628. 41     568, 324. 58       912, 783.83      1, 286, 215. 23
Allotted_---------------------___                 650, 000. 00      814, 000. 00   -190, 000. 00    1, 160, 154. 47      1, 724, 287. 08


Balance unexpended July 1, 1933_....__.____--                                                              ___     $538, 055. 93
Amount allotted from War Department Appropria-
  tion Act approved Apr. 26, 1934_______----_____-  $133,                                           000. 00
Amount allotted from War Department Appropria-
  tion Act approved July 14, 1932                    487,                                           752. 79
Amount allotted from War Department Appropria-
  tion Act approved Mar. 4, 1933---     ___--------   25,                                           000. 00
Amount allotted from National Industrial Recovery
Act approved June 16, 1933----------------- 1, 500,                                                000. 00
                                                                                                                  2, 145, 752. 79

     Amount to be accounted for ___-_____--__                                                                     2, 683, 808. 72
Deductions on account of revocation of allotment __-----                                                     -       421, 465. 71

      Net amount to be accounted for- -____-___---             _____ 2, 262, 343. 01
Gross amount expended_ -___---        -     -    ___-2, 418, 911.74
Less:
    Reimbursements collected --------   $986, 787. 29
    Receipts from sales __________-      145, 909. 22
                                                      1, 132, 696. 51
                                                                      1, 286, 215. 23

      Balance unexpended June 30, 1934___________-------                                                    976, 127. 78
Outstanding liabilities June 30, 1934                                                           4, 267. 87
                                                                                               6_____________
Amount covered by uncompleted contracts ---------                                             601, 223. 29
                                                                                                            665, 491. 16

      Balance available June 30, 1934----------___-___--                                       ------                  310, 636. 62
Accounts receivable June 30, 1934_......            __                                                                  50, 189. 20

     Unobligated balance available June 30, 1934__ ___ --    - 360, 825. 82
Amount allotted by Public Works Administration Emergency Ap-
propriation Act, fiscal year 1935__-- __-----------------   1, 043,000. 00

          Balance available for fiscal year 1935 __------__---------_                                            1, 403, 825. 82

Amount (estimated)    required to be appropriated                for completion of
                  1 - - - - - - - - - - - - - - - - -- - - - - - -- - - - - - -- - -
existing project                                                                    ----                              480, 000. 00

Amount that can be profitably expended in fiscal year ending June
   30, 1936, for maintenance 1--------------                                                                           709, 250. 00

                                                8. DOUBLE BAYOU, TEX.

  Location.--This bayou enters upper Galveston Bay on the east
side about 30 miles north of Galveston and about 81/4 miles south
of Anahuac. (See U. S. Coast and Geodetic Survey Chart No. 1282.)
  Existing project.-The existing project provides for a channel 6
feet deep at mean low tide and 100 feet wide through the bar at the
mouth of Double Bayou. Under ordinary conditions the mean tidal
range is about 0.7 foot, and the extreme range is about 0.9 foot.
The height of tides is dependent largely on the wind, and during
   1Exclusive of available funds.
686            REPORT OF CHIEF OF ENGINEERS,                                                 U. S. ARMY,            1934

strong "northers." in the winter season the water surface may be
depressed 11/2 feet below mean low tide.
   The estimate of cost for new work, revised in 1928, is $12,500.
The latest (1928) approved estimate for annual cost of maintenance
is $10,000.
   The project was authorized by the River and Harbor Act approved
March 3, 1899 (H. Doc. No. 387, 55th Cong., 2d sess.). The latest
published map is contained in the project document.
   Terminal facilities.-The terminal facilities on this waterway are
confined to small wharves for local use. They are considered ade-
quate for the present commerce.
   Operations and results during fiscal year.-Under contract the en-
trance channel in Galveston Bay was redredged between March 26
and April 14 to depth of 6 to 7 feet at mean low tide, and width of
60 feet on bottom from a point in the bay about 1,600 feet outside
the outer light beacon to the mouth of the bayou, a distance of 8,300
feet, a total of .58,057 cubic yards of sand and silt being removed,
restoring project depth. No other work was done.
   Total cost and expenditure charged to this improvement for the
year was $6,926.49, all for maintenance.
   Condition at end of fiscal year.-The project is about 70 percent
completed, a channel 5 to 7 feet deep at mean low tide and 60 to 85
feet wide having been dredged. The channel has yet to be widened
to 100 feet whenever commerce justifies. Ruling depth at mean
low tide on June 30, 1934, was 6.8 feet in the entrance channel and
about 5.8 feet inside the bayou.
   The cost of new work has been $6,953.20 and of maintenance
$105,789.93, a total of $112,743.13. The total expenditures were
$112,743.13.
   Proposed operations.-The balance unexpended July 1, 1934,
amounting to $773.51 will be applied to miscellaneous surveys, in-
spections, and estimates.
   No work is expected to be necessary during the fiscal year ending
June 30, 1936, and no funds can be profitably expended.
                                                 Cost and financial summary

Cost of new work to June 30, 1934________________---------_                                                                 $6, 953. 20
Cost of maintenance to June 30, 1934_________________________--                                                           105, 789. 93

           Total cost of permanent work to June 30, 1934______________ 112, 743. 13

Net total expenditures--.---      __------------___                                                                       112, 743. 13
Unexpended balance June 30, 1934_______________________________                                                                773. 51

           Total amount appropriated to June 30, 1934______________                                                       113, 516.64

           Fiscal year ending June 30                          1930              1931               1932           1933            1934


Cost of new work ..........----        ..--                                                                             -    --    -
Cost of maintenance --         --------                      $6, 937. 94 -----          --     $4, 624. 28-    -     -------      $6, 926. 49

Total expended         -----------------------                6, 950. 94   -            -       -             $4, 624. 28          6, 926. 49

Allotted-...... __-      ......        ...       --- _----    5, 000. 00          $9, 000 -13, 000. 00         4, 355. 55              700. 00
             RIVERS      AND HARBORS-GALVESTON,       TEX.,       DISTRICT        687

Balance unexpended July 1, 1933---------------------------- $7, 000. 00
Amount allotted from War Department Appropriation Act approved
  July 14, 1932------------ ---------                           700. 00

      Amount to be accounted for----------------------------7,                  700. 00
Gross amount expended---------------              ---------------------      6, 926.49
        Balance unexpended June 30, 1934-------------------------              773. 51

Amount (estimated) required to be appropriated for completion of
  existing project ------------------------            --------              5, 500. 00

                             9. ANAHUAC CHANNEL, TEX.

   Location.-The town of Anahuac is on the northeast side of upper
Galveston or Trinity Bay, opposite the mouth of the Trinity River,
38 miles north of Galveston and 25 miles northeast of Seabrook.
 (See U. S. Coast and Geodetic Survey Chart No. 1282.)
   Existing projet.-There is no definite project for this channel.
The River and Harbor Act approved March 3, 1905, contained an
item for " Improving West Galveston Bay Channel, Double Bayou,
and mouths of adjacent streams, including Trinity River, Anahuac
Channel, and Cedar Bayou ", but at the time of the appropriation
no recommendation of definite channel dimensions had been made to
Congress. A channel 6 feet deep at mean low tide and 80 feet wide
was dredged in 1905 from Galveston Bay to the wharves at Anahuac,
a distance of 16,000 feet. Under ordinary conditions the mean tidal
range is about 0.7 of a foot and the extreme range about 0.9 of a
foot. The height of tides is dependent largely on the wind, and
during strong " northers " in the winter season the water surface may
be depressed 11/2 feet below mean low tide. The latest (1928) ap-
proved estimate for annual cost of maintenance is $12,500. The
latest published map is contained in House Document No. 440, Fifty-
sixth Congress, first session.
   Terminal facilities.-The terminal facilities are at Anahuac and
consist of several small wharves and slips for local use. They are
considered adequate for the existing commerce.
   Operations and results during fiscal year.-During the year a rud-
der boom was maintained at the head of Browns Pass, Trinity River,
to divert drift down the Southwest Pass and prevent, so far as possi-
ble, its movement into the Anahuac Channel. The total cost of its
maintenance and repair for the year was $772.88.
   Under contract the outer portion of this channel was redredged
between January 24 and March 14 to depth of 6 to 7 feet at mean low
tide and width of 80 feet on bottom from a point about 1,000 feet
south of the inner light beacon to a point in Galveston Bay about 2
miles outside or south of the outer light beacon, a distance of 16,200
feet. One hundred and fifty-one thousand three hundred and sixty-
five cubic yards of sand and silt were removed in restoring project
depth. The cost of this redredging was $18,460.68. In addition,
$42.58 was charged to miscellaneous surveys.
  1 Exclusive of available funds.



       91536-ENG 1934-44
688         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                          1934

  Total cost of all the work on this improvement for the year was
$19,276.14, all for maintenance; the total expenditure for the year
was $19,288.26.
  Condition at end of fiscal year.-The project was completed in
1911. The ruling depth on June 30, 1934, was about 6.5 feet at mean
low tide.
   The cost of new work under the existing project has been $5,975.10
and of maintenance $200,987.01, a total of $206,962.11. The total
expenditures were $206,938.22.
  Proposed operations.-The balance unexpended July 1, 1934,
amounting to $3,578.54 will be applied during the fiscal year 1935, as
follows :
Accounts payable June 30, 1934____-------------------------------                                                       $23. 89
Maintenance :
    Operation and maintenance of boom to prevent forma-
      tion of drift jams (between July 1, 1934, and June
      30, 1935) ---------------------------------------- $1, 100. 00
    Removal of snags by the operation of a United States
      derrick barge for about 1 month at $2,000 per month
       (between July 1, 1934, and June 30, 1935)---------  2, 000. 00
    Miscellaneous surveys, inspections, and estimates (be-
      tween July 1, 1934, and June 30, 1935)-------------     454. 65
                                                                                                                      3, 554. 65
         Total--               ----------------------------------------                                               3, 578. 54
  This is an important light-draft channel serving communities with-
out railroads, and its maintenance to project dimensions is necessary.
The additional sum of $11,000 can be profitably expended during the
fiscal year 1936, as follows:
Maintenance:
   Dredging with United States dredge or by contract or leased dredge
       (between July 1, 1935, and June 30, 1936) -------------------   $8, 700
   Removal of snags by a United States derrick barge, if required (be-
      tween July 1, 1935, and June 30, 1936)                               000
                                                                        1----------------------
   Operation of boom by hired labor (between July 1, 1935, and June
      30, 1936) ------------------------------------                    1, 300
         Total------               ------------------------------------------                                           11, 000
                                       Cost and financialt summary

Cost of new work to June 30, 1934                                                                                   5, 975. 10
                                                                                                                   $-------------------
Cost of maintenance to June 30, 1934-----------------------                                                -      200, 987. 01
     Total cost of permanent work to June 30, 1934- -------.--                                                   206, 962. 11
Minus accounts payable June 30, 1934----------------------------                                                       23. 89
       Net total expenditures   ------------------------------ 206, 938. 22
      Unexpended balance June 30, 1934-------------------------3, 578. 54

         Total amount appropriated to June 30, 19,341--------_                                                   210, 516. 76

         Fiscal year ending June 30                        1930              1931           1932          1933           1934

Cost of new work- ..........               .........                    ..------------
Cost of maintenance----                    ....---------------
                                                          $7, 842. 59    $22, 297. 58    $10, 354. 53   $1, 741.34     $19, 276. 14
Total expended ...--------------         -------         7, 853. 52        21, 641.26      8, 792. 08    4, 023. 40     19, 288. 26
Allotted ---------------------------. -2, 500. 00                          11, 000. 00     7,000. 00     8, 853. 57     12, 245. 70
          RIVERS AND HIARBORS-GALVESTON,           TEX.,   DISTRICT         689
Balance unexpended July 1, 1933-----------------------------___ $10, 621. 10
Amount allotted from War Department Appropriation Act approved
  July 14, 1932---------------------------_                      12, 330. 00

      Amount to be accounted for------------------------------        22, 951.10
Deductions on account of revocation of allotment------------------         84. 30
      Net amount to be accounted for --------------------------       22, 866. 80
Gross amount expended-------- --------------------------------        19, 288.26
      .Balance unexpended June 30, 1934------------------------        3, 578. 54
Outstanding liabilities June 30, 1934-- --------------------------         23. 89
     Balance available June 30, 1934--------------------__             3, 554. 65
Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1 ---                                      11, 000. 00

                            10. CEDAR BAYOU, TEX.
   Location.-This bayou is about 30 miles long, flowing south and
emptying from the eastern shore into the northwest corner of upper
Galveston Bay, about 11/2 miles below the mouth of San Jacinto
River and about 281/2 miles north of Galveston, Tex. (See U. S.
Coast and Geodetic Survey Chart No. 1282.)
  Previous projects.-Adopted by the River and Harbor Acts of
September 19, 1890, and July 13, 1892. The cost and expenditures
were $108,871.28, of which amount $39,087.1.5 was for new work and
$69,784.13 was for maintenance.
  Existing project.-This provides for a channel 10 feet deep at
mean low tide and 100 feet wide from the Houston Ship Channel to
a point on the bayou 11 miles above the mouth. The project also
includes the jetties at the mouth of the bayou provided for under
the previous project. Under ordinary conditions the mean tidal
range is about 0.6 foot and the extreme range 1.3 feet. The height
of tides is dependent largely on the wind, and during strong
" northers " in the winter season the water surface may be depressed
2 feet below mean low tide. The estimate of cost for new work
made in 1930, exclusive of amounts expended on previous projects, is
$50,000, of which $25,000 is to be contributed by local interests.
The latest (1930) approved estimate for annual cost of maintenance
is $20,000.
   The existing project was adopted by the River and Harbor Act of
July 3, 1930 (S. Doc. No. 107, 71st Cong., 2d sess.). The latest
published map is in this document.
   Local cooperation.-The River and Harbor Act approved July 3,
1930, provides that local interests shall contribute 50 percent of the
estimated first cost of the improvement, but not to exceed $25,000,
and shall furnish, without cost to the United States, all necessary
easements, rights-of-way, and dumping grounds.
   These conditions have not yet been completely met, but local inter-
ests have complied with all the necessary requirements to complete
the channel to the first bend in Cedar Bayou above the mouth.
   Terminal facilities.-The terminal facilities consist of a few small
wharves for local use located at various places along Cedar Bayou.
They are considered adequate for the commerce that exists at present.
  Operations and results during fiscal year.-None.
  The costs and expenditures were $97.91, charged to maintenance.
 'Exclusive of available funds.
690        REPORT        OF CHIEF OF ENGINEERS,                       U.     S.       ARMY,     1934

   Condition at end of fiscal year.--The existing project is about 50
percent completed. The channel has been completed to existing
project dimensions from a connection with the Houston Ship Channel
to the first bend in Cedar Bayou above the mouth. Two brush and
stone jetties--north jetty, 1,413 feet long, and south jetty, 2,888 feet
long-have been built from shore along the sides of the channel,
both jetties being built to an elevation 2.5 feet above mean low tide.
To complete the project the bayou is to be dredged to project dimen-
sions to a point 11 miles above the mouth. The ruling depth in the
channel on June 30, 1934, was 10 feet from the Houston Ship Channel
to the first bend in Cedar Bayou above the mouth and about 6.7
feet thence to mile 11.
   The total costs under the existing project to the end of the fiscal
year were $25,151.13 for new work, of which $12,575.56 were United
States funds and $12,575.57 contributed funds, and $26,555.37 for
maintenance, a total of $51,706.50. The expenditures were $39,130.93
from United States funds and $12,575.57 from contributed funds, a
total of $51,706.50.
   Proposed operations.-The balance unexpended July 1, 1934,
amounting to $19,402.09, will be applied to maintenance dredging
by United States plant or by contract or leased dredge to remove
shoaling in channel as required.
   Recent increase in traffic of barging oil requires the maintenance
of channel at all times. The additional sum of $20,000 can be
profitably expended during the fiscal year 1936, to be applied to
maintenance dredging throughout the year as required.
                                   Cost and financial summary
Cost of new work to June 30, 1934 _-------- ----------------  $51, 662. 71
Cost of maintenance to June 30, 1934------------------------- 96, 339. 50
         Total cost of permanent work to June 30, 1934------------                                   148, 002. 21

Net total expenditures-                                      1148, 002. 21
Unexpended balance June 30, 1934------------- --------------   19, 402. 09

        Total amount appropriated to June 30, 1934----------------                                   167, 404. 30
        Fiscal year ending June 30               1930          1931            1932           1933           1934

Cost of new work .--------------     -------------------------             $12, 575. 56
Cost of maintenance______----------------_    $21, 652. 61      $20. 34 ----------.       $26, 437. 12         $97. 91

Total expended__-----------------------        21, 655. 86       20. 34     12, 575. 56    26, 437. 12          97. 91
Allotted------------       ----------------   21,00.00       28, 500.00 -23, 000. 00       45, 723. 84       -451. 64

Balance unexpended July 1, 1933------------------------                                              $19, 951. 64
Deductions on account of revocation of allotment-----------------                                         451. 64

      Net amount to be accounted for------------------------19,                                             500. 00
Gross amount expended----------------------    -----------------                                             97. 91

        Balance unexpended June 30, 1934                     ---------------------- 19, 402.09

Amount (estimated) required to be appropriated for completion of
existing project 2  --------------------------------------      312, 500. 00

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 2--------------                                                               20, 000. 00
   'Exclusive of $12,575.57 expended from contributed funds.
   SExclusive of available funds.
   SIn addition $12,400 to be contributed by local interests.
         RIVERS AND HARBORS-GALVESTON,         TEX.,   DISTRICT     691
                       11. CLEAR CREEK, TEX.

    Location.-Clear Creek has its source about 13 miles south of
Houston, Tex., and flows southeast for a distance of about 25 miles,
emptying into the west side of upper Galveston Bay at a point 24
miles northwest of Galveston, Tex. (See U. S. Coast and Geodetic
Survey Chart No. 1282.)
    Existing project.-This provides for a channel 4 feet deep at mean
low tide and 50 feet wide across the bar at the mouth in Galveston
Bay and through Clear Lake to deep water in Clear Creek. Under
ordinary conditions the mean tidal range is about 0.6 foot and the
extreme range 1.3 feet. The height of tides is dependent largely on
the wind, and during strong "northers " in the winter season the
water surface may be depressed 2 feet below mean low tide. The
original estimate of cost for new work, made in 1900, was $10,000.
    The latest (1928) approved estimate for annual cost of mainte-
nance is $6,000.
    The project was authorized by the River and Harbor Act ap-
proved June 13, 1902 (H. Doc. No. 449, 56th Cong., 1st sess.). The
latest published map is printed in House Document No. 264, Seventy-
third Congress, second session.
    Recommended modifications of project.-Under date of February
14, 1934, the Chief of Engineers recommended modification of the
existing project so as to provide for a channel 6 feet deep and 60
feet wide in Clear Creek from deep water in Galveston Bay to the
bridges 1 mile above the mouth at an estimated increased cost for
maintenance of $3,500 per annum. (H. Doc. No. 264, 73d Cong.,
2d sess.)
    Terminal facilities.-The terminal facilities consist of small
wharves for local use located at the town of Seabrook, at the mouth
of the creek, and at various points along the length of the water-
way. They are considered adequate for existing commerce.
    Operations and results during fiscal year.-Under contract the
shoaled part of the entrance channel in Galveston Bay was redredged
between May 12 and 23 to a depth of 6 feet at mean low tide and
width of 50 feet. A total length of channel of 3,000 feet was re-
dredged, beginning at a point about 1,500 feet west of the light
beacon and extending nearly to the mouth of the creek, and 14,217
cubic yards of sand and silt removed.
    Total cost and expenditure for the year was $4,002.47, all for main-
tenance.
    Condition at end of fiscal year.-The project was completed in
1908. Ruling depth on June 30, 1934, was about 5 feet in the en-
trance channel and 3.1 feet across the lake at mean low tide.
    The cost of new work under the existing project has been $14,290.95
and of maintenance $62,373.49, a total of $76,664.44. The total
expenditures were $76,664.44.
   Proposed operations.-The balance unexpended July 1, 1934,
amounting to $2,997.53, will be applied to miscellaneous surveys, in-
spections, and estimates.
    No work is expected to be necessary during the fiscal year ending
June 30, 1936, and no additional funds can be profitably expended.
692          REPORT OF CHIEF OF ENGINEERS9                                     U.   S. ARMY,         1934

                                  Cost and financial summary
Cost of new work to June 30, 1934------------------------------    $14, 290. 95
Cost of maintenance to June 30, 1934------------------_         -_ 62, 373. 49
         Total cost of permanent work to June 30, 1934---------------                                             76, 664. 44

Net total expenditures                                                                                                664. 44
                                                                                                                  7-----------------------------
Unexpended balance June 30, 1934-                                --..                                              2, 997. 53
         Total amount appropriated to June 30, 1934---------------                                                79, 661. 97

         Fiscal year ending June 30                  1930               1931         1932        1933                  1934


Cost of new work -.....-              -     -I-                                                  .-       --...          .
Cost of maintenance        .                      $11, 119. 02           $19. 34                     __               $4, 002. 47
Total expended     ----------------------- 11, 160. 18                    19. 34                                       4, 002. 47
Allotted_    ----------------------------         -6, 000. 00           7,00. 00 -$7, 731.27   --$    6. 92            7, 000.0 0


Amount allotted from War Department Appropriation Act approved
  Mar. 4, 1933      --------------------------------------      $7, 000. 00
Gross amount expended -----------------------------------------  4, 002. 47
         Balance unexpended           June 30, 1934---_                                                            2, 997. 53

                               12. FREEPORT HARBOR, TEX.

   Location.-This harbor is formed by the improvement of the
Brazos River, Tex., from the mouth to Freeport, about 6 miles above.
 (See U. S. Coast and Geodetic Survey Chart No. 525.)
   The mouth of the Brazos River is about 47 miles southwest of
Galveston Harbor entrance and about 137 miles northeast of Aransas
Pass (Port Aransas).
   Previous projects.-Adopted by River and Harbor Act approved
June 14, 1880. The total cost and expenditures were $147,098.43, all
for new work. For further details see page 1860 of Annual Report
for 1915.
   Eisting project.-This provides for a channel about 22 feet deep
at mean low tide and not to exceed 25 feet deep and 150 feet wide
from the jetties up to the present steamship wharf, and for such
extension of the project upstream toward the town of Freeport as
may be found desirable, to be attained by dredging, by jetties at the
mouth of the harbor, and by a diversion dam in the Brazos River, a
diversion channel, and necessary auxiliary works in general accord-
ance with plan no. 6, as proposed by the district engineer, together
with a lock in the diversion dam approximately 200 feet long, 55
feet wide, and 121/2 feet deep over the miter sills.
   The Secretary of War is authorized to modify the route of the
diversion channel and any or all of the auxiliary features in such
manner as may seem to him satisfactory and desirable, after con-
sideration of such alternative plans as may be submitted by local
interests; provided, however, that in no such case shall the total first
cost to the Government of the modification of the project author-
ized by the act of March 3, 1925, exceed the sum of $500,000, nor the
estimated annual maintenance cost to the Government exceed $75,000,
including care and operation of a lock, if provided. The River and
         RIVERS AND HARBORS-GALVESTON,         TEX.,   DISTRICT   693
Harbor Act of July 3, 1930, modified the act of March 3, 1925, so as to
provide that, when local interests shall have furnished assurances
satisfactory to the Secretary of War that they will maintain the
diversion channel, the United States shall assume the cost of main-
tenance of the navigable channel, estimated at $75,000 annually, in-
cluding care and operation of the lock, if provided. (See Rivers and
Harbors Committee Doc. No. 18, 70th Cong., 1st sess.)
   Under ordinary conditions the mean tidal range is about 1.8 feet
and the extreme range about 21/2 feet. Freshets in the river, except
under extreme conditions, do not cause a greater variation in the
water surface than the tidal action.
   The estimate of cost for new work, revised in 1928, is $2,260,000,
exclusive of amounts expended on previous projects, but including
 $1,100,000 to be contributed by local interests. The latest (1928) ap-
proved estimate for annual cost of maintenance is $75,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1899, provided for " dredging and
such other work as may be deemed most effective in the judgment
of the Secretary of War in improving and developing the harbor ",
and also provided for taking over the jetties and other auxiliary
works built at the mouth of the river by a private company; as a
result of an examination authorized by the River and Harbor Act of
March 2, 1907, the work was confined to maintenance of the jetties
 (H. Doc. No. 1087, 60th Cong., 3d sess.); by the River and Harbor
Act of February 27, 1911, dredging was again authorized in addition
to repairs to the jetties. The act of March 4, 1913, provided for the
construction of the seagoing hopper dredge, one-half the cost to be
charged to this improvement and one-half to Aransas Pass. The act
approved August 8, 1917, modified the project by providing for the
purchase of one 15-inch pipe-line dredge and equipment, its opera-
tion for an experimental period of 3 years, the operation of the
seagoing dredge one-half time for 3 years, and repairs to the jetties
 (H. Doc. No. 1469, 63d Cong., 3d sess.). The River and Harbor Act
of March 3, 1925, provided for the diversion dam, the diversion
channel, and necessary auxiliary works (Rivers and Harbors Com-
mittee Doc. No. 10, 68th Cong., 2d sess.) and the act of July 3, 1930,
further modified the project to provide for maintaining the diversion
channel at the expense of local interests (Rivers and Harbors Com-
mittee Doc. No. 18, 70th Cong., 1st sess.). The latest published
maps are printed in Rivers and Harbors Committee Document No.
15, Seventy-second Congress, first session.
   Supplementing the work authorized by Congress the modification
of the project so as to provide a channel from deep water in the Gulf
of Mexico to the jetty entrance 32 feet deep and 300 feet wide, thence
30 feet deep and 200 feet wide to the turning basin at Brazosport
as recommended by the Chief of Engineers in Rivers and Harbors
Committee Document No. 15, Seventy-second Congress, first session,
was included in the Public Works program under the National In-
dustrial Recovery Act.
   Recommended modifications of project.-Under date of May 3,
1932, the Chief of Engineers recommended modification of the exist-
ing project so as to provide a channel from deep water in the Gulf
of Mexico to the jetty entrance, 32 feet deep and 300 feet wide;
694    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,          1934

thence a channel 30 feet deep and 200 feet wide to the turning basin
at Brazosport, and a depth of 30 feet in the turning basin, at an
estimated cost of $226,500, with $100,000 annually for maintenance,
this being $25,000 more than now required; and so as to provide
for a channel 30 feet deep and 200 feet wide to and including the
turning basin near the Stauffer chemical plant at Freeport, at an
additional cost of approximately $79,000; subject to certain condi-
tions of local cooperation, including the contribution of $100,000
toward the cost of the improvements from the Gulf to the Brazosport
turning basin, and 50 percent of the cost of the improvements above
Brazosport (Rivers and Harbors Committee Doc. No. 15, 72d Cong.,
1st sess.). Channel to Brazosport included under Public Works
program.
   Under date of February 14, 1934, the Chief of Engineers recom-
mended further modification of the project so as to provide for the
maintenance of a channel 32 feet deep from deep water in the Gulf
of Mexico to a point about one-half mile below the Stauffer Chemi-
cal Plant with two turning basins, one 700 by 700 feet at
Brazosport and one 600 by 600 feet at the upper end of the
channel, the channel to have a width of 300 feet seaward of the
jettied entrance, 200 feet from the jettied entrance to the Brazosport
turning basin, widened at the bend, and averaging 375 feet, thence
to the upper turning basin, the widths in the approaches to the
turning basins to converge within a distance of 800 feet from the
width of the turning basin to the width of the channel, all at an
estimated cost for maintenance of $115,000 annually for the first
2 years and $100,000 annually thereafter; and to provide also for
the extension of the channel with a depth of 30 feet and a width of
200 feet to and including the turning basin near the Stauffer Chem-
ical Plant at Freeport at a cost of $18,000 when required in the in-
terests of commerce and navigation; subject to certain conditions
of local cooperation. (Rivers and Harbors Committee Doc. No. 29,
73d Cong., 2d sess.).
   Lodal cooperation.--All conditions of local cooperation required
for prosecution of that modification of the project contained in Rivers
and Harbors Committee Document No. 15, Seventy-second Congress,
first session, and now included in the Public Works program under
the National Industrial Recovery Act, as well as those required by
prior acts, have been fully met.
   Terminal facilities.-The terminal facilities are located at the
towns of Freeport and Velasco at the upper end of this improvement
and at a point about a mile above the inner ends of the jetties. The
facilities at Freeport consist of a small wharf, privately owned,
and one free public wharf owned by the municipality of Freeport.
The wharves at Velasco are in such a bad state of repair as to be
practically useless. The facilities just inside the mouth of the river
consist of 1 sulphur-loading dock, about 250 feet long, 1 oil dock,
and 1 steamship wharf, about 450 feet long, with wooden shed. The
existing facilities are considered adequate for the commerce that
exists. Provision has been made for the construction of a public
wharf.
        RIVERS AND HARBORS-GALVESTON,        TEX.,   DISTRICT    695
            OPERATIONS AND RESULTS DURING FISCAL YEAR

   Project authorized by FederalEmergency Administration of Pub-
lic Works--New Work.-With a combination of funds provided
from the National Industrial Recovery Act under the Public Works
program, and funds contributed by local interests, work was begun
on the modified project in improving the channel from deep water
in the Gulf of Mexico to the turning basin at Brozosport (in ac-
cordance with the provisions of Rivers and Harbors Committee Doc.
No. 15, 72d Cong., 1st sess.). Under the provisions of section 4
of the River and Harbor Act of March 4, 1915, the Secretary of
War accepted the contribution by local interests of $125,000 to pro-
vide for an interior channel of 32 feet depth throughout, widened
to 375 feet above Brazosport, a turning basin 700 feet square at
Brazosport, and a turning basin 600 feet square at the head of
the channel.
   The U. S. hopper dredge Galveston dredged on the channel sea-
ward of the jettied entrance from April 10 to 27, excavating 298,407
cubic yards at a cost of $13,115.29. Under contract the portion of
the channel from the jettied entrance to and including the upper
turning basin is being widened and deepened with a combination
of funds from the National Industrial Recovery Act and those
contributed by local interests. At the end of the fiscal year there
had been excavated 313,289 cubic yards at a cost of $22,581.65 from
Public Works funds, and 1,696,241 cubic yards at a cost of $124,846.42
from contributed funds.
   Total cost of all work for the year prosecuted with Public Works
funds was $35,696.94. Total expenditure was $33,507.62.
   Total expenditure from contributed funds was $109,356.93.
   Existing project--Maintenance.-Between August 7 to September
1, 1933, and March 4 and April 9, 1934, the U. S. hopper dredge
Galveston, operating on the channel seaward from the Brazosport
turning basin, removed 875,303 cubic yards at a cost of $41,475.61.
   Between October 2 and 15, the U. S. dredge Sam Houston, operat-
ing in the jetty channel, removed 35,664 cubic yards of material at
a cost of $7,639.02. Miscellaneous surveys, etc., during the fiscal
year cost $3,595.30.
   Under two contracts for the repairs to both the jetties, between
July 7 and December 31, 1933, there was placed 17,241.92 tons new
cover stone, 3,426.08 tons new core stone, and 1,740 pieces of old
cover stones picked up and replaced, all at a cost of $96,043.41.
   The cost for maintenance during the fiscal year was $148,753.34,
and the total expenditures $148,976.54, all from regular funds.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1931. The two jetties were repaired during the year and
are now restored to former cross section and length.
   The project authorized by the Public Works Administration and
the additional enlargement with funds contributed under section 4,
act of March 4, 1915, as described under existing project is about
53 percent completed. A total of about 13,600 linear feet of the
inside channel, including a portion of the Brazosport turning basin,
have been completed to the new dimensions provided by this modified
696         REPORT OF                 CHIEF                OF ENGINEERS,                        U.     S. ARMY,               1934

project. The channel seaward of the jetty entrance is about 57
percent completed to the modified dimensions.
   The ruling depth at mean low tide of the modified channel sea-
ward of the jettied entrance is 27 feet along the center line.
   The modified channel from the jetty entrance to the Brazosport
turning basin has a ruling depth at mean low tide of 32 feet to
about station 103+00. The Brazosport turning basin has a ruling
depth of 25 feet at mean low tide over project widths. From the
upper end of the Brazoport turning basin, about station 123+00
to station 152+ 00, the modified channel has a ruling depth of 32 feet
below mean low tide over the modified width.
   In the remainder of the channel to and including the upper turn-
ing basin there is a ruling depth of 25 feet below mean low tide over
the project width.
   The total cost of this improvement to June 30, 1934, has been as
follows:

                                                                                              New work          Maintenance                  Total

Regular funds ...   ------------------------------------                               ..   $1, 101,061. 89 $1, 648, 642. 35             $2, 749, 704. 24
Public works funds----------------..............                                 ...            35, 696. 94-.-.----------                    35, 696. 94
      Total United States funds                      -------------------------               1, 136, 758. 83     1, 648, 642. 35          2, 785, 401. 18
Contributed funds....---------------------------------                                         533, 302. 79 .......------------.......      533, 302. 79
Contributed funds (sec. 4, River and Harbor Act, Mar. 4, 1915)                                 124, 846. 42--------------                   124, 846. 42
      Total (all funds)-        -------------------------------                              1, 794, 908. 04     1, 648, 642. 35          3, 443, 550. 39



  The total expenditures on the existing project have been $3,282,-
757.03, of which $2,715,946.62 were regular funds, $33,507.62 Public
Works funds; and $533,302.79 were from contributed funds.
  The total expenditures on the Public Works Administration proj-
ect were $142,864.55, of which $33,507.62 were derived from Public
Works funds and $109,356.93 from contributed funds.
  Proposed operations.-The balance of United States funds un-
expended July 1, 1934, amounting to $81,789.18, together with funds
to be contributed by local interests amounting to $75,000, a total of
$156,789.18, will be applied during the fiscal year 1935, as follows:
                                                     UNITED STATES FUNDS

Accounts payable June 30, 1934-                                                                                                             $250. 00
Maintenance:
    Dredging sea bar channel with Government plant as needed
      from time to time, 600,000 cubic yards (between Nov. 1, 1934,
      and June 30, 1935)         ---------------------------------                                                                       55, 000. 00
    Dredging channel from jettied entrance to Brazosport, includ-
      ing the turning basin, with United States pipe-line dredge or
      by contract, 260,000 cubic yards (between Jan. 1, 1935, and
      Apr. 30, 1935)----------------------------------------                                                                             26, 539. 18

           Total           --------------------------------------------                                                                  81, 789. 18
                                                           CONTRIBUTED FUNDS
Maintenance:
    Engineering and contingencies, to provide for any needed chan-
      nel protection, intracoastal canal protection, and rectification
      of works other than normal maintenance------------ ----- 75, 000. 00

           Total contributed and United States funds--------------156, 789. 18
                 RIVERS AND HARBORS-GALVESTON,                                               TEX., DISTRICT                       697
  The balance unexpended at the end of the year from allotment
made from the National Industrial Recovery Act of June 16, 1933,
amounting to $92,992.38, and funds contributed, amounting to $115,-
643.07, a total of $208,635.45, will be applied as follows during the
fiscal year 1935:
Accounts payable June 30, 1934--------------------                    $17, 678. 81
New work :
    Dredging sea bar channel with Government plant
     32 feet deep and 300 feet wide on bottom, 800,000
     cubic yards (between Oct. 15, 1934, and Nov. 30,
     1934) ------------------- __----------------        $79, 159. 94
    Complete existing contract for dredging channel 32
     feet deep, 200 feet wide on bottom from the outer
      ends of the jetties to Brazosport, thence about
     375 feet wide, 32 feet deep to station 224 just be-
     low Freeport (between July 1, 1934, and June 26,
     1935)     -----------------------------------       111, 796. 70
                                                                      190, 956. 64

              Total for new work---__                        _2-----------------------------08, 635.45
  The additional sum of $100,000 can be profitably expended during
the fiscal year 1936, as follows:
Maintenance:
   Dredging sea bar channel with Government plant, 700,000 cubic
      yards (during October and December 1935 and March 1936) .... $70, 000
   Dredging channel from jetty entrance to Freeport under contract,
      400,000 cubic yards (during January and March 1936)---------30, 000

              Total -----------------------------------------                                                         ---     100, 000

                                          Cost and financial summary
                                MAINTENANCE                AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934________________________---- $1, 248, 160. 32
Cost of maintenance to June 30, 1934_________________------1, 648, 642. 35
     Total cost of permanent work to June 30, 1934----------2, 896, 802. 67
Minus accounts payable June 30, 1934   ------                       250. 00

     Net total expenditures--_ --------------------------
                                  _                                                                                2, 896, 552. 67
Unexpended balance June 30, 1934-...._.....-------------                                                               81, 789. 18

          Total amount appropriated to June 30, 1934__ ________                                                    2, 978, 341. 85

          Fiscal year ending June 30                          1930               1931           1932           1933             1934


Costof new work--------___                               $10, 052.18-----------------
Cost"of maintenance---.........._              .....      37, 829. 22      $77, 833. 29      $87, 823. 77   $46, 201.84     $148, 753. 34

       Total cost     ----         .......------------------ 47, 881. 40       77, 833. 29    87, 823. 77    46, 201. 84     148, 753. 34

Total expended_________-----------------________         102, 755. 22          86, 951. 41    86, 834. 82    48, 146. 15     148, 976. 54

Allotted_ -------
              __------___--                               25, 000. 00 130, 000. 00 -50, 000. 00
                                                         -________                                          190, 274. 67      72, 456. 10


Balance unexpended July 1, 1933--------------------------- $158, 309. 62
Amount allotted from War Department Appropriation Act approved
  Apr. 26, 1934   -------------------------------------------  77, 000.00
      Amount to be accounted for     ------------                                                                      235, 309. 62
Deductions on account of revocation of allotment ------                                                                  4, 543. 90
          Net amount to be accounted for-                                  -                                           230, 765. 72
698            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

Gross amount expended---         --
                            - _________------                                      $149, 185. 02
Less reimbursements collected_------ ---   ----                                          208. 48
                                                                                                         $148, 976. 54
      Balance unexpended June 30, 1934__-- -- ______---_____                                                 81, 789. 18
Outstanding liabilities June 30, 1934 ---- __________________-                                                   250. 00
           Balance available June 30, 1934 ________                      __________                 _        81, 539.18
Amount that can be profitably expended in fiscal year ending 'June
30, 1936, for maintenance 1______________________________                                                   75, 000. 00
                                           PUBLIC WORKS FUNDS

Cost of new work to June 30, 1934___                           -___           -                     $35, 696. 94
                                                                                          -___________-__
Cost of maintenance to June 30, 1934                       _____              __           ________

Total cost of permanent work to June 30, 1934 _    ------                                                    35, 696. 94
Minus accounts payable June 30, 1934-- -----------------------                                                2, 189. 32
     Net total expenditures_________________                                  _____-_                        33, 507. 62:
Unexpended balance June 30, 1934                                                                             92, 992. 38
           Total amount appropriated to June 30, 1934________________                                     126, 500. 00

           Fiscal year ending June 30               1930          1931             1932           1933            1934


Cost of new work----....--    ----     ------------ ------------                                               $35, 696. 94
Cost of m aintenance-. . .. . .. .... ---..... ---.     ....----...-
                                                        ----------                                                   . ...
Total expended------------------                ------          ---------------------------------                33, 507. 62

Allotted ......   .126,                                                                                             500. 00,


Amount allotted from National Industrial Recovery Act approved
  June 16, 1933--------       -----------------------------                  $126, 500. 00
Gross amount expended ______________                     ___.. $48, 256.12
Less reimbursements collected-------- ------                  __ 14, 748. 50
                                                                               33, 507. 62
    Balance unexpended June 30, 1934---__________________                                                    92, 992.38
Amount covered by uncompleted contracts___________________
                                                    -13,                                                         832. 44
           Balance available June 30, 1934                     _____________               _______           79, 159. 94

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1 _____________________________25,                                                    000. 00
                                            C'ONTRIBTJT D       FUNDS

Cost of new work to June 30, 1934__-_____________________                                                 658, 149.21
Cost of maintenance to June 30, 1934_____   ___-_______--___-----------
      Total cost of permanent work to June 30, 1934 ----             __---                                658,   149. 21
Minus accounts payable June 30, 1934________________________                                               15,   489. 49,
      Net total expenditures_ -_____--- -    ___          _____-                                          642,   659. 72
Unexpended balance June 30, 1934____-...             ____---------                                        115,   643. 07
      Total amount contributed to June 30, 1934_____ __ 1_____                                            758,   302. 79

           Fiscal year ending June 30               1930          1931             1932           1933            1934


Cost of new work..------------------- $398, 241. 92 $126, 947. 12              $1, 839. 46         $12. 83    $124, 846. 42
Cost of maintenance-----------....      ------------------------------------                        ----------------
Total expended-------.------.--.--_ -- 319, 972. 38 211,438. 05                   1,802. 35         90. 01 109, 356. 93
         ........--..-.---
Contributed----                             - - 475, 000. 00    50, 000. 00                   -16, 697. 21     225, 000. 00

   SExclusive of available funds.
                RIVERS AND -HARBORS-GALVESTON                                      TEX., DISTRICT                    699
Amount contributed by Brazos River navigation district of
   Brazoria County__ -------------------------------------- $225, 000. 00
'Gross amount expended----------------------- $109, 373. 93
Less reimbursements collected                          7. 00
                                                       1---------------------
                                                                 109, 356. 93
     Balance unexpended June 30, 1934--------------------                                                  115, 643. 07
outstanding liabilities June 30, 1934---------------- 920. 11
Amount covered by uncompleted contracts----------114, 722. 96
                                                                                                            115, 643. 07
        CONSOLIDATED COST ANDI FINANCIAL SUMMARY FOR FREEPORT HARBOR, TEX.

Cost of new work to June 30, 1934--------------------------- $1, 942, 006. 47
Cost of maintenance to June 30, 1934-------------------------1, 648, 642. 35

     Total cost of permanent work to June 30, 1934--                                  ---------         3, 590, 648. 82
Minus accounts payable June 30, 1934                                                                         7, 928. 81
                                                                                                            1------------------------

      Net total expenditures --------------------------------                                           3, 572, 720. 01
Unexpended balance June 30, 1934----------------------------                                               290, 424. 63

           Total amount appropriated and contributed to June 30,
            1934-----------------------------------                                                     3, 863, 144. 64

           Fiscal year ending June 30                    1930          1931           1932          1933           1934


Cost of new work___... -       __......_.....     . $408, 294. 10 $126, 947. 12    $1, 839. 46       $12. 83    $160, 543. 36
Cost of maintenance-- _ _....--------..            . 37, 829. 22    77, 833. 29    87, 823. 77   46, 201. 84     148, 753. 34
        Total cost-----__               -_______-_446,123. 32      204, 780. 41    89, 663. 23   46, 214. 67     309, 296. 70
Total expended_ -__------__                     __--422, 727. 60   298, 389. 46    88, 637. 17   48, 236. 16     291, 841. 09
Allotted and contributed            ------------- 500, 000. 00     180, 000. 00   -50, 000. 00   173, 577. 46    552, 511. 50


Balance unexpended July 1, 1933-----------------     -------      $158, 309. 62
Contributed by Brazos River navigation district of
  Brazoria County-------------------------------$225, 000. 00
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934-----------------------   77, 000. 00
Amount allotted from National Industrial Recovery
  Act approved June 16, 1933_--------------------   126, 500. 00
                                                                   428, 500. 00

      Amount to be accounted for------------------------------586, 809.62
Deductions on account of revocation of allotment ---------------- 4, 543. 90

      Net amount to be accounted for--------------------------582, 265. 72
Gross amount expended---------------------------- 306, 815.07
Less reimbursements collected----------------------- 14, 973. 98
                                                                 291, 841. 09

      Balance unexpended June 30, 1934------------------------                                              290, 424. 63
Outstanding liabilities June 30, 1934---------------- 1,170. 11
Amount covered by uncompleted contracts------------ 128, 555. 40
                                                                                                           '129,725.51
           Balance available June 30, 1934--------------------------                                        160, 699. 12

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1----------------                                                                100, 000. 00

    1Exclusive of available funds.
700      REPORT OF   CHIEF OF ENGINEERS,   U.   S. ARMY,   1934

      13. CHANNEL FROM ARANSAS PASS TO CORPUS CHRISTI, TEX.

   Location.-This channel extends from Aransas Pass through the
depression known as " Turtle Cove " and through Corpus Christi Bay
to Corpus Christi Harbor, on the west side of the bay, a distance of
203/4 miles west of Port Aransas. (See U. S. Coast and Geodetic
Survey Charts Nos. 1285 and 1286.)
   Previous projects.-Adopted by River and Harbor Acts approved
March 2, 1907, and June 25, 1910. The cost and expenditures were
$342,907, of which $280,455.14 was for new work and $62,451.86 for
maintenance.
   Existing project.-This provides for a channel 30 feet deep at
mean low tide and 200 feet wide on bottom, provided with widened
passing places from deep water at Port Aransas through Turtle
Cove and Corpus Christi Bay to the east side of the Corpus Christi
breakwater. Under ordinary conditions the mean tidal range is
about 1 foot and the extreme range about 11/2 feet. The heights of
tides are dependent largely on the winds, and during strong " north-
ers " in the winter season the water surface may be depressed 2 feet
below mean low tide.
   The estimate of cost for new work, revised in 1930, was $2,232,800,
exclusive of amount expended on previous projects. The latest
 (1930) approved estimate for annual cost of maintenance is $249,000.
   The existing project was adopted by the River and Harbor Act of
September 22, 1922, which provided for a channel 25 feet deep (H.
Doc. No. 321, 67th Cong., 2d sess.) and the River and Harbor Act
approved July 3, 1930, provided for the present dimensions of the
project (Rivers and Harbors Committee Doc. No. 9, 71st Cong., 1st
sess.). The latest published maps are in the last-mentioned docu-
ment and House Document No. 130, Seventy-second Congress, first
session.
   Recommended modifications of project.-Under date of December
5, 1931, the Chief of Engineers recommended modification of the
existing project so as to include maintenance by the Federal Gov-
ernment of the channel and maneuvering basin between the break-
water and the shore line of Corpus Christi Bay, at an estimated cost
of $5,000 per annum (H. Doc. No. 130, 72d Cong., 1st sess.).
   Local cooperation.-Fully complied with.
   Terminal facilities.-Terminals have been constructed at Corpus
Christi, Aransas Pass, Harbor Island, and Ingleside. The present
facilities are adequate to care for the existing commerce. (See Port
Series No. 6, pt. 3, revised 1932, Corps of Engineers.)
   Operations and results during fiscal year- Maintenance.- Under
contract during July, August, and September 1933, sections 3 and
4 were redredged.
   Section 2 was redredged with a leased dredge during October
1933. During March, April, May, and June 1934, the U. S. dredge
Sam Houston redredged a portion of sections 1 and 2. Total quan-
tity of material dredged during the year was 3,822,897 cubic yards.
   The total cost for maintenance work for the fiscal year, including
surveys, inspections, etc., was $257,168.80. The total expenditures
were $252,992.73.
   Condition at end of fscal year.-The existing project was com-
pleted in 1931 at a saving of $109,354 under the estimated cost. The
               RIVERS AND HARBORS-GALVESTON,                                    TEX., DISTRICT                    701
ruling depths June 30, 1934, were section 1, 28 feet; section 2, 28
feet; section 3, 30 feet; and section 4, 31 feet; all 200 feet wide on
the bottom.
  The total cost under the existing project to June 30, 1934, was
$3,555,718.50, of which $2,123,446.59 was for new work and $1,432,-
271.91 for maintenance. The total expenditure was $3,609,978.97.
In addition $16,903.75 was expended from contributed funds for
maintenance.
  Proposed operations.-Thebalance unexpended, including accounts
receivable, July 1, 1934, amounting to $150,989.48, will be applied as
follows :
Accounts payable June 30, 1934         -------------------------- $5, 009. 26
Maintenance: Dredging channel by Government plant or contract,
  2,800,000 cubic yards (July 1, 1934, to June 30, 1935)----------- 145, 980. 22

         Total            --------------------------------------------                                    150, 989. 48
  The additional sum of $249,000 can be profitably expended during
the fiscal year 1936, in maintenance dredging throughout the project,
January to June 1936.
                                     Cost and financial summary
Cost of new work to June 30, 1934  ------------------------                                         $2, 403, 901. 73
Cost of maintenance to June 30, 1934 1---------                                                      1, 494, 723. 77
      Total cost of permanent work to June 30, 1934----------                                        3, 898, 625. 50
Value of plant, materials, etc., on hand June 30, 1934----------                                         58, 689. 63
      Net total cost to June 30, 1934-----------------------                                         3, 957, 315. 13
Plus accounts receivable June 30, 1934 --- --                                                                 80. 10
                                                                                                             5--------------------

      Gross total costs to June 30, 1934--------------------                                         3, 957, 895. 23
Minus accounts payable June 30, 1934-------------------------                                             5, 009. 26
     Net total expenditures 1-----------                                                             3, 952, 885. 97
Unexpended balance June 30, 1934 ----------------------------                                           150, 409. 38
         Total amount appropriated to June 30, 1934-------------4, 103, 295. 35

   Fiscal year ending June 30            1930            1931               1932             1933             1934


Cost of new work ________________                     $168, 105. 79      $237, 540. 51 _____________.___________.-
Cost of maintenance ....  ........    $137, 864. 91    122, 403. 84       221, 823. 47    $42, 056. 81   $257, 168. 80

      Total cost---                    137, 864. 91    290, 509. 63       459, 363. 98      42, 056. 81      257, 168. 80
Total expended                         187, 105. 24    241, 974. 06       362, 553. 71   -238, 719. 82       252, 992. 73
Allotted____________________           105, 000. 00    565, 000. 00   -180, 000. 00       -40, 769. 11       189, 787. 53


Balance unexpended July 1, 1933--------------------------$213, 614.58
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934___
                           -----------------------   $85, 000. 00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933--------------------     - 108,385. 42
                                                                  193, 385. 42

     Amount to be accounted for_ ________ _  _-------------                                               407, 000. 00
Deductions on account of revocation of allotment----------------                                            3, 597. 89

         Net amount to be accounted for ________--------                                                  403, 402. 11

  1 In addition, $16,903.75 was expended from contributed funds for maintenance.
702        REPORT OF CHIEF OF ENGINEERS,             U.   S.   ARMY,   1934

Gross amount expended ------------------                   $261, 334. 87
Less reimbursements collected --------------------             , 342..14
                                                                           $252, 992. 73

      Balance unexpended June 30, 1934---------------------                 150, 409.38
Outstanding liabilities June 30, 1934_ ---------------------                  5, 186. 77

      Balance available June 30, 1934------------------------ 145, 222. 61
Accounts receivable June 30, 1934----------------------------      580. 10

         Unobligated balance available June 30, 1934 ---------------        145, 802. 71

Amount that can be profitably expended in fiscal year ending
June 30, 1936, for maintenance 1-------------------------                  249, 000. 00

      14. CHANNEL FROM PASS CAVALLO TO PORT LAVACA, TEX.

   Location.-The bar at Pass Cavallo is 125 miles southwest of Gal-
veston entrance and 54 miles north of Aransas Pass. Port Lavaca
lies 26 miles to the northward of the pass, across Matagorda and
Lavaca Bays. (See U. S. Coast and Geodetic Survey Chart No.
1117.)
  Existing,project.-This provides for a channel 7 feet deep at mean
low tide and 80 feet wide from deep water in lower Matagorda Bay
to Port Lavaca, a distance of about 8 miles.              Under ordinary condi-
tions the mean tidal range is about 1 foot and the extreme range
about 2 feet. The height of tide is dependent largely on the wind,
and during strong " northers " in the winter season the water surface
may be depressed 2 feet below mean low tide. The original estimate
of cost for new work was $10,000, with $2,500 annually for mainte-
nance. These estimates were made in 1908.
   The existing project was adopted by the River and Harbor Act of
June 25, 1910 (H. Doc. No. 1082, 60th Cong., 2d sess.). The latest
published map is in the project document.
   Terminal facilities.-The terminal facilities located at Port Lavaca
consist of two wooden piers, 30 feet wide and 500 feet long, with a
slip between about 200 feet wide. They are sufficient for the demands
of the port commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1910. On June 30, 1934, the ruling depth was 7 feet in the
Gallinipper Reef Channel and 7 feet in the Sand Point Reef Chan-
nel over a bottom width of 75 feet. Elsewhere the channel had a
ruling depth of 7 feet.
   The total costs and expenditures have been $19,500, of which
$9,699.48 was for new work and $9,800.52 for maintenance.
   Proposed operations.-The balance unexpended July 1, 1934,
amounting to $10,000, will be applied to maintenance dredging in
the channels, through Sand Point and Gallinipper Reefs by leased
plant or by contract, as may be needed during the fiscal year of
1935.
   No funds are expected to be required for the fiscal year of 1936,
as it is probable the channel depths will remain ample during that
year.
  1 Exclusive of available funds.
              *RIVERS AND HARBORS--GALVESTON,                                   TEX.,    DISTRICT                 703
                                       Cost and financial summary

Cost of new work to June 30, 1934___                                                                    $9, 699. 48
Cost of maintenance to June 30, 1934---                                   ---------------
                                                                                        ___              9,800. 52

          Total cost of permanent work to June 30, 1934                                  ___            19, 500. 00
Net total expenditures            ..---------------------------------- 19,500. 00
Unexpended balance June 30, 1934 ..--------------------------- 10,000.00

          Total amount appropriated to .June                         30, 1934--------------             29, 500. 00

          Fiscal year ending June 30                     1930         1931        1932         1933            1934


Cost of new work .
Cost of maintenance--.....            .....        .   $2, 145. 94     $28. 48------------       $52.47 ..---------
Total expended-..----------------------_________        4, 419.05 --------------------...................
                                                                                            52. 47 .
Allotted-....._._ ........
                       .....                      4,500.0 ----------- $10,000.00 10, 000. 00
                                               -.....                                                         .....

Balance unexpended July 1, 1933---------------------------------- $10, 000
Balance unexpended June 30, 1934---------------------------------10, 000

                                      15. PORT ARANSAS, TEX.

   Location.-PortAransas is on the southern portion of the coast of
Texas, 180 miles southwest of Galveston and 132 miles north of the
mouth of the Rio Grande. (See U. S. Coast and Geodetic Survey
Map No. 1285.)
   Previous projects.-Adopted by the River and Harbor Act of
March 3, 1879. The improvement was taken over by the Aransas
Pass Harbor Co. on June 30, 1890, under authority of the act of May
12, 1890. This company relinquished its rights to the United States
on March 27, 1899. The cost and expenditures by the United States
were $1,092,079.29, all for new work. In addition thereto there was
expended by the citizens of Rockport and Corpus Christi the sum
of $9,938.93, and by the Aransas Pass Harbor Co. the sum of $401,-
554.18, making a total of expenditures by the United States and local
interests of $1,503,572.40.   For further details see page 1861 of
Annual Report for 1915.
   Existing project.-This provides for two rubblestone jetties ex-
tending into the Gulf from St. Joseph and Mustang Islands, the
project lengths of which are 11,190 and 8,650 feet, respectively, and
for a channel .between them 30 feet deep at mean low tide in the
inner part, 33 feet deep at mean low tide in the outer part, and 600
feet wide on the bottom, from the Gulf to Harbor Island Basin.
The project further provides for a stone dike on St. Joseph Island
about 19,100 feet long connecting with the north jetty and extending
up this island to prevent a channel being cut around the north jetty;
for an inner basin at Harbor Island, 30 feet deep at mean low tide,
650 feet wide, and about 3,000 feet long; .and for the dredging of an
approach channel 12 feet deep at mean low tide and 100 feet wide
with basin at end leading from Harbor Island Basin to the town of
Port Aransas.
        91536-ENG 1934----45
704     REPORT OF CHIEF OF ENGINEERS,        U.   S.   ARMY,   1934


    Under ordinary conditions the mean tidal range is about 1.1 feet
  and the extreme range about 2 feet. The height of tides is de-
pendent to some extent on the winds, and during strong " northers "
in the winter season the water surface may be depressed 2 feet below
mean low tide.
    The estimate of cost for new work, revised in 1931, exclusive of
amounts expended on previous projects and of $105,000 contributed
by local interests, is $2,664,500. The latest (1928) approved estimate
for annual cost of maintenance is $200,000.
    The existing project was authorized by the following river and
harbor acts: The act of March 3, 1899, provided for taking over the
old or curved portion of the north jetty, which had been constructed
by private parties; the acts of June 13, 1902, and March 3, 1905, pro-
vided for the completion of this old or curved portion according to
the plans of its builders; the act of March 2, 1907, provided for the
extension shoreward of the old curved portion of the north jetty to
connect with St. Joseph Island and for the construction of the south
jetty (Rivers and Harbors Committee Doc. No. 5, 59th Cong., 2d
sess.); the act of February 27, 1911, provided for the dredging of
the roadstead in the Harbor Island Basin to a depth of 20 feet and
for 10,000 linear feet of the stone dike on St. Joseph Island (H. Doc.
No. 1094, 61st Cong., 3d sess.); the act of March 4, 1913, provided
for the deepening of the channel between the jetties and the Harbor
Island Basin to 25 feet, for the extension of the jetties, the extension
of the stone dike on St. Joseph Island 9,100 feet, and for the ap
proach channel 12 feet deep to the town of Port Aransas (H. Doc
No. 1125, 62d Cong., 3d sess.); and the River and Harbor Act of
July 3, 1930, provided for deepening the entrance channel from the
Gulf of Mexico to Harbor Island and the provision of an inner
basin at Harbor Island of reduced area but greater depth (H. Doc.
214, 70th Cong., 1st sess.). The latest published maps are in the
last-mentioned document and Rivers and Harbors Committee Docu-
ment No. 35, Seventy-second Congress, first session.
   Supplementing the work authorized by Congress, the modification
of the existing project to provide a channel 37 feet deep and 700 feet
wide from deep water in the Gulf to a point opposite the outer end
of the south jetty, thence decreasing to 35 feet deep and 400 feet
wide to a point opposite Spur Dike A, thence 35 feet deep and 400
feet wide to the inner basin, thence a channel 35 feet deep and 400
feet wide (decreasing to a width of 300 feet) to a point opposite the
western end of the basin dredged by the Humble Oil & Refining Co.
at its docks on Harbor Island with widening opposite the northwest
corner of Mustang Island at an estimated cost of $210,000, with
$80,000 annually for maintenance in addition to that now required
for the adopted project, as recommended by the Chief of Engineers
in Rivers and Harbors Committee Document No. 35, Seventy-second
Congress, first session, was included in the Public Works program
under the National Industrial Recovery Act.
   Reconmended mmodifications of pioject.-The modification recom-
mended in Rivers and Harbors Committee Document No. 35, Seventy-
second Congress, first session, was included in the Public Works
         RIVERS AND   HARBORS-GALVESTON,     TEX.,   DISTRICT    705
program. Under date of April 24, 1934, the Chief of Engineers
recommended further modification of project so as to provide a
channel 600 feet wide and 35 feet deep from a point opposite station
90, north jetty, to the vicinity of Clines Point at an estimated cost
of $60,000, with $10,000 annually for maintenance in addition to the
amount now required for the modified project. (Rivers and Har-
bors Committee Doc. No. 40, 73d Cong., 2d Sess.)
  Local cooperation.-All conditions of local cooperation required
for prosecution of that modification of the project contained in
Rivers and Harbors Committee Document No. 35, Seventy-second
Congress, first session, and now included in the Public Works pro-
gram under the National Industrial Recovery Act as well as those
required by prior acts have been fully met.

             OPERATIONS AND RESULTS DURING FISCAL YEAR

   Project authorized by Federal Emergency Administration of
Public Works.-New= work..-With funds provided under the Public
Works program, work of widening and deepening the bar and jetty
channels were prosecuted by the U. S. hopper dredge Gal-
veston from December 6, 1933, to March 2, 1934, removing 1,096,577
cubic yards of sand and silt at a cost of $57,412.56, and by the U.
S. hopper dredge Chinook from March 19 to April 7, 1934, re-
moving 96,370 cubic yards of sand and silt at a cost of $19,212.69.
A total of 1,192,947 cubic yards of material was removed by these two
dredges at a cost of $76,625.25.
   Under contract, October 16, 1933, to January 4, 1934, a channel
was dredged from the inner end of the jetty channel 35 feet deep
and 400 feet wide (decreasing to width of 300 feet to a point oppo-
site the western end of the basin dredged by the Humble Oil & Refin-
ing Co. at its docks on Harbor Island, with widening opposite the
northwest corner of Mustang Island (Clines Point)). A total of
862,834 cubic yards of clay and sand and 2,959.15 cubic yards of rock
were removed and replaced as revetment on Clines Point, at a total
cost of $126,737.28, completing this work. The cost of all new work
prosecuted with Public Works funds was $203,362.53. The total
expenditures were $203,362.53.
   Eisting project-Maintenance.-Under contract January 6-10,
1934, the 12-foot channel leading to and turning basin at the Port
Aransas public wharf were redredged. A total of 19,056 cubic yards
of sand was removed at a cost of $2,934.02.
   During March 1934 the U. S. dredge Sam Houston removed a por-
tion of the old Mansfield jetty, removing 25,000 cubic yards of sand
and rock, at a cost of $11,009.22.
   The derrick barge No. 8 worked during February, March, and
April 1934 on the removal of the Mansfield and Nelson Jetties, re-
moving 771 tons of rock at a cost of $13,586.10.
   The derrick barge No. 2 worked during December 1933 and Jan-
uary, March, April, May, and June 1934 on the removal of the
Mansfield and Nelson Jetties, removing 904 tons of rock at a cost of
$10.499.02.
706          REPORT OF CHIEF OF ENGINEERS,                                         U. S. ARMY,                1934


   Between September 2 and November 30, 1933, and May 4 and June
30, 1934, the U. S. hopper dredge Galveston redredged the inner and
outer channels, removing 1,750,354 cubic yards of sand at a cost of
$86,612.52.
   During the fiscal year, miscellaneous surveys, repairs to St. Joseph
dike, etc., were made at a total cost of $9,341.09.
   The total cost of all maintenance for the year prosecuted with
regular funds was $133,981.97. Total expenditures were $126,987.75.
   Condition at end of fiscal year.-The existing project is about 65
percent complete. Two jetties have been built, the north jetty 9,240
feet long, and the south jetty 7,385 feet long. A stone dike connect-
ing with the north jetty has been constructed on St. Joseph Island,
its total length being 20,991 feet; this part of the project was com-
pleted in 1916. The channel between the jetties from the Harbor
Island Basin to the Gulf has been dredged to 30 feet at mean low
tide inside and 33 feet deep at the Gulf end. Harbor Island Basin
has been deepened to 30 feet at mean low tide over an area 650 feet
wide and about 1,000 feet long at the lower end adjacent to the dock.
   The approach channel from Harbor Island Basin to the town of
Port Aransas was completed in 1914.
   The Harbor Island Basin is yet to be completed 650 feet wide
and 3,000 feet long.
   Project authorized by Public Works Administration.-This project
is about 50 percent complete. To complete this project the jetty
channel has to be deepened and widened.
   The ruling depths at mean low tide along the center line of the
channel June 30, 1934, were as follows: Channel seaward of the
jetty entrance 35 feet, thence from end of jetties to opposite spur A
31 feet, thence from spur A to inner end of jetties 35 feet, thence
from inner end of jetties to western end of Humble Oil Refining
Co. basin 35 feet.
   Harbor Island Basin has a ruling depth of 30 feet over project
dimensions. The approach channel to Port Aransas has a ruling
depth on center line and in the turning basin 12 feet.
   The total cost of this improvement to June 30, 1934, has been as
follows:

                                                                                 New work         Maintenance           Total

Regular funds.._------ ---------------------                    _________          $2, 269, 515. 46 $2, 728, 048. 28 $4, 997, 563. 74
Public Works funds__ ....                              ....-----------------------     203, 362.53 --------------        203, 362. 53

      Total United Statesfunds_____ _...
                                     . ..........-
                                         --        -                            2, 472, 877. 99   -
                                                                                                  2, 728, 048. 28     5, 200, 926. 27

,Contributed funds_        ...--------     -    -------     ---------------           -----           135, 651. 34      135, 651. 34

      Total, all funds ____-- ___-. --------------------------                  2, 472, 877.99    2, 863, 699. 62     5, 336, 577. 61



   The total expenditures on the existing project have been $4,990,-
126.85. In addition, $135,651.34 was expended from contributed
:funds for maintenance.
   The total expenditures from Public Works funds were $203,362.53.
   Proposed operations.-The funds unexpended July 1, 1934, includ-
ing accounts receivable, amounting to $314,244.98, will be applied as
follows during the fiscal year 1935:
           RIVERS: AND, HARBORS-GALVESTON,                           TEX.,    DISTRICT           707
Accounts payable June 30, 1934----------------             -$7,                    222. 26
Maintenance:
    Dredging channel, by Government plant, from deep
       water in the Gulf of Mexico to abreast of Clines
      Point, about 850,000 cubic yards (between July
       1, 1934, and June 30, 1935) ------------------      $85, 000.00
    Dredging inner harbor, with Government plant or
       by contract, about 600,000 cubic yards (between
     ..Sept. 1, 1934, and Jan. 1, 1935)                          000. 00
                                                             6------------------5,
    Repairs of the jetties, by contract, during the fiscal
       year, 25,000 tons of stone ---------          __--150, 000.00
    Repairs to St. Joseph Island dike and sand dam,
       etc., by contract (July 1 to Nov. 1, 1934)---------    7, 022. 72

         Total for maintenance               ----------------------------               307, 022. 72

          Total-------------------------------------314,                                       244.98
   The balance of funds allotted from the National Industrial Re-
covery Act of June 16, 1933, amounting to $68,637.47, will be applied
to new work, dredging channel with Government plant from deep
water in the Gulf of Mexico to a point opposite the end of the south
jetty, 37 feet deep, 700 feet wide on bottom, thence to a point oppo-
site spur A, 35 feet deep, reducing in width to 400 feet at spur A,
thence 35 feet deep and 400 feet wide to near Clines Point, about
690,000 cubic yards, between July 1, 1934, and December 31, 1934.
   The additional sum of $260,000 can be profitably expended during
the fiscal year 1936 as follows:
Maintenance:
   Dredging channel with Government plant, about 2,000,000 cubic
      yards (between July 1, 1935, and June 30, 1936)                    --------------
                                                                    $175, 000
   Dredging inner harbor, by Government plant or by contract, about
      400,000 cubic yards (between July and August 1935 and Jan-
      uary and February 1936) -------------------------------         50, 000
   Dredging channel to the town of Port Aransas, as needed, about
      180,000 cubic yards------------------------------------         20, 000
   Repairs to St. Joseph Island dike, sand dam, .and Clines Point
      revetment by hired labor, as needed during the year             15, 000 ----------
         Total for maintenance__------------------------------                               260,000

                                 Cost and financial summary
                         MAINTENANGE         AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934_____                            ____       __     $3, 361, 594. 75
Cost of maintenance to June 30, 1934 -- ___---                     --------------    2, 728, 048. 28

      Total cost of permanent work to June 30, 1934                                     089, 643. 03
                                                                                     6----------,
Value of plant, materials, etc., on hand June 30, 1934                   -    ---
                                                                             ---           -230. 57

      Net total cost to June 30, 193411                                              6, 089, 412. 46
Plus accounts receivable June 30, 1934 __-                 _____ _____________15.                 94

      Gross total costs to June 30, 1934                                                089, 428. 40
                                                                                     6--------------------,
Minus accounts payable June 30, 1934_    .____.______-______                            -7, 222. 26

     Net total expenditures                             ----  , 082, 206. 14
                                                             6-----------------------
Unexpended balance June 30, 1934...-------------------------    314, 229. 04

       Total amount appropriated to June 30, 1934-------------                       6 396. 435. 18

  1In addition $135,651.34 was expended from contributed funds for maintenance.
708            REPORT OF CHIEF OF ENGINEERS, U. S. ARMVY,                                                                              1934


          Fiscal year ending June 30                                1930                1931                   1932                 1933                    1934

Cost of new work-----.......---------..                --------....             ---------------                            -------------------
Cost of maintenance----------------------.. $154, 588. 94 $123, 433. 70 $138, 220. 68 $121, 234. 90                                                   $133, 981.97
Total expended..........---------------------                 173, 504. 91       111, 410. 65               133, 275. 15     137, 044. 12               126, 987. 75

Allotted-----------            ---------------                200, 000.00        190,000.00                -90,000.00        182, 273.42                324, 411.76


Balance unexpended July 1, 1933------------------------------ $116, 805.03
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934_----------       -   $297, 000. 00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933_-____-------------        33, 194. 97
                                                                 330, 194. 97

      Amount to be accounted for-__------------ --------------                                                                                  447, 000. 00
Deductions on account of revocation of allotment                                                                                                  5, 783. 21

          Net amount to be accounted for -------------------                                                                                    441, 216. 79
Gross amount expended----------------------------                                                                140, 451. 41
Less reimbursements collected                                   -             -----      -        --               13, 463. 66
                                                                                                                                                126, 987. 75

      Balance unexpended June 30, 1034-----------------------314, 229. 04
                                       -------------------
Outstanding liabilities June 30, 1934_____                   -  7, 244. 30

      Balance available June 30, 1934_-------------------                                                                                       306, 984. 74
Accounts receivable June 30, 1934--------_---------------------                                                                                       15.94

      Unobligated balance available June 30, 1934___                                                                       __                   307, 000. 68

Amount (estimated) required to be appropriated for completion
of existing project ----------------------------------------                                                                                   395, 000. 00

Amount that can be profitably expended in fiscal year ending June
                             - -- -- - -- -- -- -- - -- -- -- -- ----- ----
30, 1936, for maintenance 1                                                                                                                   180. 000. 00
                                                      PUBLIC WORKS FUNDS

Cost of new work to June 30, 1934______________________             $203, 362. 53
Cost of maintenance to June 30, 1934_.......__ ____....... ......__

          Total cost of permanent work to June 30, 1934-----------                                                                             203, 362. 53

Net total expenditures--------------------                                                                                                      203, 362. 53
Unexpended balance June 30, 1934______-____----______________                                                                                    68, 637. 47
          Total amount appropriated to June 30, 1934_ -                                                               --
                                                                                                                _______--                      272, 000. 00

          Fiscal year ending June 30                                1930                 1931                  1932                1933                     1934


Cost of new work        ----------------------------------------------------------                                                                    $203, 362. 53
Cost of maintenance---...-------------------                    -----------          -------------------                    -------------......................---------

Total expended                   ------------------------------------------------                                                                       203, 362.53
Allotted----- ---------------------------------                     ------ -------------- ------------------------                                      272,000. 00

   1Exclusive of available funds.
              RIVERS AND HARBORS-GALVESTON,                                    TEX., DISTRICT                           709
Amount allotted from National Industrial Recovery Act approved
  June 16, 193--------------        ------- ----------------- -         $272, 00. 00
Gross amount expended ___-------___-----------          $214, 834.72
Less reimbursements collected-_-------------------          11, 472. 19
                                                                         203, 362. 53

      Balance unexpended June 30, 1934----------------------                                                    68, 637. 47
Outstanding liabilities June 30, 1934_ -------------     18. 15
Amount covered by uncompleted contracts---              6------00
                                                     -650.
                                                                                                                     668. 15

         Balance available June 30, 134                                                                          7, 969. 32
                                                                                                                6------------------------

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance ----------------------------------                                                   80, 000. 00

        CONSOLIDATEDI COST AND FINANCIAL SUMMARY                              FOR PORT ARANSAS,                  TEX.

Cost of new work to June 30, 1934_    _                                                                 $3, 564, 957.28
Cost of maintenance to June 30, 1934 2 _-----------                                                      2, 728, 048. 28

      'Total cost: of permanent work to June 30, 1934---------                                               6, 293, 005. 56
Value of plant, materials, etc., on hand June 30, 1934---- ___-                                                   -230. 57

                                    --------------------
      Net total cost to June 30, 1934                                                                        6, 292, 774. 99
Plus accounts receivable June 30, 19,34_ ...---.         -----                           ---                      -15.94

      Gross total costs to June 30, 1934--------------------                                             6, 292, 790. 93
Minus accounts payable June 30, 1934--------------------                                            -         7, 222. 26

     Net total expenditures------   ---------------------     6, 285, 568. 67
Unexpended balance June 30, 1934_------__ __ --      -           382, 866. 51
                                                        -_________-

         Total amount appropriated to June 30, 1934------------                                          6, 668, 435. 18

         Fiscal year ending June 30                 1930          1931            1932              1933             1934


Cost of new work------------------    _ _ ---------------------------- ------------ $203,362.53
Cost of maintenance.------------------$154, 588.94 $123, 433. 70 $138, 220. 68 $121, 234. 90 133, 981.97
      Total cost---------------------------     154, 588.94    123, 433. 70    138, 220. 68     121, 234. 90       337,344. 50
Total expended....-------.....---------------   173, 504. 91   111, 410. 65    133, 275. 15     137, 044. 12       330, 350. 28
Allotted--------------------------------        200, 000, 00   190, 000.00    -90, 000. 00      182, 273.42        596, 411.76


Baltance unexpended July 1, 1933 __  _   _____________________ $116, 805.03
Amount allotted from War Department Appropria-
  tion Act approved Apr. 26, 1934 ________-----$297, 000. 00
Amount allotted from War Department Appropria-
  tion Act approved Mar. 4, 1933-----------------33, 194. 07
Amount allotted from National Industrial Recovery
  Act approved June 16, 1933--------------------    272, 000. 00
                                                                 602, 194. 97

     Amount to be accounted for--_--      ____________                                         __              719, 000. 00
Deductions on account of revocation of allotment_ .... ____                                     -__     _-       5, 783. 21

      Net amount to be accounted for -----------------------                                                   713, 216.79
Gross amount expended         ---------------       355, 286. 13
Less reimbursements collected-___--------------      24, 935. 85
                                                                                                ----           330, 350. 28

         Balance unlexpended June 30. 1934--------                                                             382, 866. 51

  1 xclusiie
          e if available funds.
   SIn addition $L35,651.34 was expended from contributed funds for maintenance.
710       REPORT OF CHIEF OF ENGINEERS,: U .                    .. ARMY,   19:334

Outstanding liabilities June 30, 1934__---___----       __$7,        262. 45
Amount covered by uncompleted contracts ___-----                 -   650. 00
                                                                                $7, 912.45
     Balance available June 30, 1934_--------------------------374,                 954. 06
Accounts receivable June 30, 1934_____________ __--------------                      15. 94

       Unobligated balance available June 30, 1934-----------                  374, 970.00

Amount (estimated) required to be appropriated for completion
  of existing      project 1-____----------_   _-----                          395, 000. 00

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance.. ----------------------                            260, 000. 00

                        16. BRAZOS ISLAND HARBOR, TEX.

   Location.-This harbor is at the extreme south end of the coast of
Texas, about 7 miles north of the mouth of the Rio Grande, and
about 125 miles south of Port Aransas. The harbor is at the inner
end of Brazos Santiago Pass, which lies between Brazos and Padre
Islands, and is the natural outlet from the Laguna Madre to the
Gulf of Mexico. (See U. S. Coast and Geodetic Survey Chart No.
1288.)
  Previous projects.-Authorized in 1878, 1881, and March 2, 1919.
The costs on the original and modified projects were $675,855.30. In
addition, $123,361.67 was expended from contributed funds for new
work. The total expenditures were $677,393.46 United States funds
and $123,361.67 contributed funds, a total of $800,755.13. For fur-
ther details see page 1017, Annual Report for 1932.
  Existing project.-This provides for a channel 25 feet deep and
300 feet wide through Brazos Santiago Pass, with jetty protection;
for a channel 25 feet deep and 100 feet wide from the pass to a point
on the westerly side of Long Island; for a channel 25 feet deep and
100 feet wide from the end of the Brazos Santiago Pass-Long Island
Channel to and including a turning basin 500 feet square at Point
Isabel; and for a channel 25 feet deep and 100 feet wide from the
end of Brazos Santiago Pass-Long Island Channel to and including
a turning basin, 1,000 feet square in the vicinity of Brownsville.
Under ordinary conditions the mean tidal range is about 11/2 feet and
the extreme range about 2 feet. The height of the tides is dependent
to some extent on the wind, and during strong " northers " in the
winter season the water surface in the southern end of the Laguna
Madre may be raised 4 feet or more above the mean low tide in the
Gulf.
  The estimate of cost for new work, made in 1930, is $4,783,000, of
which local interests are to contribute $2,425,000, exclusive of
amounts expended on previous projects. The estimate of annual cost
of maintenance made in 1930 is $150,000.
  The existing project was adopted by the River and Harbor Act of
July 3, 1930. (Rivers and Harbors Committee Doc. No. 16, 71st
Cong., 2d sess.). The latest published maps are in Rivers and Har-
bors Committee Document No. 9, Seventieth Congress, first session,
and Rivers and Harbors Committee Document No. 10, Seventy-first
Congress, first session.

  1 Exclusive   of available funds.
          RIVERS AND HARBORS-GALVESTON,              TEX.,   DISTRICT      711
   Recommended modifications of project.-Under date of April 2,
1932, the Chief of Engineers recommended that the project be modi-
fied to eliminate the provision requiring the contribution of specific
sums of money and to provide, in lieu thereof, that local interests
shall contribute funds sufficient to cover the entire cost of the origi-
nal dredging of all channels and turning basins inside of the entrance
channel through Brazos Santiago Pass and that no work shall be
undertaken upon the channel through the pass until local interests
have contributed sufficient funds for the execution of either or both
of the channels to Point Isabel and/or to Brownsville, respectively,
including the turning basins, all other conditions of local cooperation
heretofore established to remain in full force and effect. (Rivers
and Harbors Committee Doc. No. 10, 72d Cong., 1st sess.).
   Local cooperation.-The River and Harbor Act of July 3, 1930, in
adopting the existing project for further improvement at this locality
provides:
   (a) That local interests shall donate to the United States the north end of
Brazos Island from a due east and west line 2,000 feet south of the old Coast
Guard station, and the south end of the Padre Island from a due east and west
line 500 feet north of the quarantine station.
   (b) That local interests shall give assurances satisfactory to the Chief of
Engineers and the Secretary of War that suitable terminal facilities will be
made available.
   (c) That no work shall be undertaken on the channel to Brownsville until
the sum of $2,175,000 has been contributed to the cost of the project and neces-
sary rights-of-way and spoil-disposal areas have been furnished free of cost to
the United States.
   (d) That nb work shall be undertaken on the channel to Point Isabel until
the sum' of $450,000 has been contributed to the cost of the project and neces-
sary rights-of-way and spoil-disposal areas have been furnished free of cost to
the United States.
   (e) That no work shall be undertaken on any part of the project until local
interests shall have contributed either or both of the sums aforesaid.
   In adopting the project the act provides that no expense shall
be incurred for the acquiring of any lands required to be donated to
the United States for the purpose of this improvement or for other
purposes; that the channel from the inner side of the pass to Long
Island and thence to the turning basin near Brownsville shall be
situated entirely within what is known as the " Brownsville naviga-
tion district " and shall take the most direct practicable route toward
Brownsville; that if both the Brownsville and Point Isabel Channels
and turning basins are constructed, the total amount to be contrib-
uted in cash by local interests shall be in the sum of $2,425,000, thus
avoiding duplication of the expense of constructing the channel from
the inner side of the pass to Long Island, estimated at: $200,000; and
that the width of any or all inner channels may be widened provided
such proposed widening meets the approval of the Chief of Engi-
neers and all expense incident thereto is paid by local interests.
   The south end of Padre Island and the north end of Brazos
Island have been deeded to the United States as required under (a)
above. The transfer was approved and title accepted by the United
States Attorney General November 15, 1932.
   The plans of the terminals, required under (b) above for the Port
Isabel-San Benito navigation district, were approved by the Chief
of Engineers October 24, 1932, and those for the Brownsville navi-
712     REPORT   OF CHIEF OF ENGINEERS,     U.   S. ARVIY,   1934

gation district were approved by the Chief of Engineers January
5, 1933.
    The requirements under (c) above have not been completed. Deeds
with, abstracts of title in favor of the United States for all lands
except two tracts needed for the channel to Brownsville have been
furnished and are now being examined by the United States district
attorney. At the request of the Secretary of War the United States
district attorney is instituing condemnation suits to secure to the
United States title to the two remaining tracts.
    The requirements under (d) and (e) above have been fully com-
plied with by the Port Isabel-San Benito navigation district. The
Brownsville navigation district has not furnished the funds to be
contributed under (e).
    Terminal facilities.--There are no terminal facilities at Brazos
Island.
    The approved terminal of the Port Isabel-San Benito navigation
commission at Port Isabel is now under construction and will prob-
ably be completed for public use about July 30, 1934.
    Operationsand results during fiscal ear-Neo work.-With funds
contributed by the Port Isabel-San Benito navigation district, the
contract for dredging the channel from Brazos Santiago to and in-
cluding the turning basin at Port Isabel was completed on September
15, 1933. A total of 1,934,760 cubic yards of material was removed
at a cost of $132,629.78. The expenditures were $165,494.23.
    During the fiscal year, with funds contributed by the Brownsville
navigation district, rights-of-way surveys in connection with ease-
ment deeds and spoil disposal areas for the channel from westward of
Long Island to and including the turning basin near Brownsville,
Tex., were made. The cost of all new work prosecuted with funds
contributed by the Brownsville navigation district was $284.16, and
expenditures for the fiscal year were $284.16.
   With funds allotted by the Federal Emergency Administration
of Public Works, work on the existing project was prosecuted under
a contract for the construction of the north and south jetties at
Brazos-Santiago Pass. Work was begun on the contract November
5, 1933, and to the end of the fiscal year 56,933 tons riprap base,
42,261 tons core, and 34,971 tons cover stone, a total of 134,165 tons,
were placed in both jetties, completing 32 percent of the work. The
total cost of all new work prosecuted with Public Works funds was
$873,668.47. Total expenditures were $700,498.34.
   Maintenance.-With regular funds the work carried on during the
fiscal year consisted of making surveys of the bar and inside chan-
nels. The total cost of the above operations was $5,131.69. Total
expenditure was $5,290.75.
   The total cost of all work during the year was $1,011,714.10, of
which $873,668.47 were Public Works funds and $132,913.94 were
contributed funds ($132,629.78 contributed by the Port Isabel navi-
gation district and $284.16 contributed by the Brownsville naviga-
tion district), a total of $1,006,582.41, all charged to new work, and
$5,131.69 regular funds for maintenance, which included the survey
of both the outside and inside channels. Total expenditure was
              RIVERS        AND HARBORS-GALVESTON,                             TEX., DISTRICT                    713

$871,567.48, of which $700,498.34 were Public Works funds, $5,290.75
regular funds, and $165,778.39 contributed funds.
   Condition at end of fiscal year.--The work on the jetty channel and
the channel from westward of Long Island to and including the turn-
ing basin near Brownsville has not yet been started. The jetties are
under construction but have not reached sufficient length to affect the
bar. The channel across the bar and through Brazos-Santiago Pass
had on June 30, 1934, a controlling depth of 14 feet about 200 feet
wide across the bar, 18 feet about 400 feet wide through the pass, and
6 feet about 700 feet wide for a distance of 2,100 feet at outer end of
channel. All depths refer to mean low tide.
   The dredged channel now abandoned across the Laguna between
the pass and railroad wharf at Point Isabel has a controlling depth
of 2 feet and bottom width of 100 feet. The railroad wharf, how-
ever, can be reached through the Laguna with a controlling depth
of 4 feet. Dredging on the channel from the pass across the Laguna
to a point westward of Long Island, and thence, to and including the
turning basin at Point Isabel, was completed September 15, 1933,
completing during the fiscal year 8,226 linear feet of the channel, 25
feet deep below mean low tide over a bottom width of 100 feet, and
the turning basin 25 feet deep below mean low tide over a bottom
length of 700 feet and a bottom width of 600 feet. On June 30,
1934, the channel throughout its length had a ruling depth of 21
feet below mean low tide over a bottom width of 100 feet, and the
turning basin 25 feet below mean low tide over its entire bottom area.
   The total cost of the existing project to June 30, 1934, has been as
follows :

                                                                       New work          Maintenance        Total

Regular funds...------------  --------    ------------------------        $9, 324. 70  $9, 590. 80          $18, 915. 50
Public Works funds...---------------     -------------------------       87366. 47 --------------           873, 668. 47
      Total, United States funds....-------------------      -------     882, 993. 17        9, 590. 80     892, 583. 97
Contributed funds...----------------------------          -------        269, 925. 24 --------------        269, 925. 24
      Total all funds--
                     ....     ------------------------------           1, 152, 918. 41       9, 590. 80   1, 162, 509. 21


   The total expenditures under the existing project were $987,667.26,
of'which $17,244.28 were regular funds, $700,498.34 Public Works
funds, and $269,924.64 contributed funds.
   Proposed operations.-The balance unexpended and accounts re-
ceivable July 1, 1934 ($9,122.61 United States funds and $2,373.64
contributed funds and $1,967,000 to be contributed, a total of $1,978,-
496.25), will be applied during the fiscal year 1935 as follows:
                                           UNITED STATES FUNDS

Accounts payable June 30, 1934-----------------------                                                          $8. 14
Maintenance: Continuation of repairs to shore branches of the
  jetties by contract or hired labor (between July 1, 1934, and
  June 30, 1935) ---------------------     --------------------                                           9, 114. 47
      To.tal United States funds---------------                                                           9, 122. 61
714      REPORT OF CHIEF OF ENGINEERS,                                       U. S. ARMY,       1934

                                          CONTRIBUTED FUNDS

Accounts payable June 30, 1934-_____._____                                                              $0. 60
New work :
    Rights-of-way surveys, preparation of plans, and
      specifications for dredging channel from west-
      ward of Long Island to and including the
      turning basin near Brownsville-------------        $2, 373. 04
    Dredging 17,400,000 cubic yards from inner
      channel westward of Long Island to and in-
      cluding turning basin near Brownsville, by
      contract, between Sept. 1, 1934, and Feb. 28,
      1936 (funds to be contributed) ------------- _ 1, 967, 000. 00
                                                                                                1, 969, 373. 04
         Total contributed funds------------------------------                                  1, 969, 373.64

         Total United States and contributed funds-------------1,978,496. 25
  The balance unexpended July 1, 1934, amounting to $2,099,501.66,
including accounts receivable from the $2,800,000 allotted to this
improvement from the National Industrial Recovery Act approved
June 16, 1933, will be applied as follows:
Accounts payable June 30, 1934__                      ------                   _____________     $173, 720. 87
New work:
   Construction of 2 jetties under existing contract at Brazos-
     Santiago Pass (July 1, 1934, to June 30, 1935)------------1, 825, 780. 79
   Dredging jetty channel with United States hopper dredge
     (between Aug. 1, 1934, and Dec. 30, 1934)                              -----------------
                                                                  100, 000. 00
         Total ------------------------------------                                             2,099, 501. 66
  The additional sum of $431,500 can be profitably expended during
the fiscal year 1936, as follows:
New work: Completion of the 2 jetties at Brazos Island Harbor, Tex.
  (July 1, 1935, to Aug. 30, 1935) __---------------------------------- $321, 500
Maintenance :
    Maintenance dredging of the jetty channel with United States
      hopper dredge (between July 1, 1935, and June 30, 1936)------       60, 000
    Maintenance dredging by contract of channel from Brazos-Santi-
      ago Pass to Long Island (between July 1, 1935, and June 30,
      1936) ----------------------                                        40, 000
    Maintenance dredging, by contract, of channel from Long Island
      to and including turning basin at Port Isabel (between July 1,
      1, 1935, and June 1936) --------- ------------            ------    10,000
         Total for maintenance                            ---------------                             110, 000
         Total for all work---------------------------------------                                    431, 500
                                   Cost and financial summary
                           MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934 ----  _-_-__                                                   $685, 180. 00
Cost of maintenance to June 30, 1934--.-----------------------                                      91,590. 80
      Total cost of permanent work to June 30, 1934------------- 694, 770. 80
Value of plant, materials, etc., on hand June 30, 1934-------------   -141. 35
      Net total cost to June 30, 1934----------------------------694, 629.45
Plus accounts receivable June 30, 1934---------------------------         16.43
      Gross total costs to June 30, 1934------------------------- 694, 645. 88
Minus accounts payable June 30, 1934-                                       8. 14
      Net total expenditures- ----        -------                   694, 637. 74
Unexpended balance June 30, 1934__---------             -             9, 10:6. 18
      Total amount appropriated to June 30, 1934...                 703, 743. 92
                 RIVERS AND HARBORS--GALVESTON,                                                                       TEX.,          DISTRICT                          715

          Fiscal year ending June 30                                        1930                      1931                  1932                    1933             1934


Cost of new work....................---------------------. $8, 966. 89                          $5, 338. 27 $4, 225. 76                               $11. 40------
Cost of maintenance__.....            .....____________-----------                            ----------------------                               4, 459.11    $5, 131. 69

       Total cost..                           ..----------------------- 8, 966. 89                  5, 338. 27             4, 225. 76              4, 470. 51        5, 131. 69

Total expended....                 ..----..       ..------------------ 10, 501. 26                  5, 928. 96             2, 336. 00              3, 688. 57        5, 290. 75

Allotted..... --            ..--          ....---------------------6, 250. 00                       9, 000.00         -5, 000.00                   8, 498. 64        4, 081. 50


Balance unexpended July 1, 1933.---------------------------- $10, 315. 43
Amount allotted from War Department Appropriation Act approved
  Apr. 26, 1934   _      -------------------------------------- 5, 200. 00
                        ______---------

      Amount to be accounted for-------------------------------                                                                                                 15, 515. 43
Deductions on account of revocation of allotment---------                                                                                                        1, 118. 50

           Net amount to be accounted for---------------------------- 14, 396. 93.
Gross amount expended-----------                                                      --                     ----                   $5, 986. 10
Less reimbursements                           collected                                ---                                                  695. 35
                                                                                                                                                                  5, 290. 75

           Balance unexpended June 30, 1934__                                                                                                                     9, 106. 18
Outstanding liabilities June 30, 1934---                                                                                                           -                  23. 16

     Balance available June 30, 1934._______________-------- -                                                                                                    9, 083. 02
Accounts receivable June 30, 1934   ____------__      __---------16.                                                                                                      43
           Unobligated balance available June 30, 1934--                                                                                                           , 099. 45
                                                                                                                                                                  9--------------
Amount (estimated) required to be appropriated for completion of
   existing        project 1---                     --.-------------                                                                                        321, 500. 00

Amount that can be profitably expended in fiscal year ending June
30, 1936:
       For new work                  --                            ----                                                        --                   --      321, 500. 00
       For maintenance ------------------------------------------                                                                                           110, 000. 00
           Total 1--------------------------------------2--                                                                                                 431, 500. 00
                                                            PUBLIC WORKS                          FUNDS

Cost of new work to June 30, 1934-....--                                                                                      ----                          873, 668. 47
Cost of maintenance to June 30, 1934

      Total cost of permanent work to June 30, 1934_.........                                                                                               873, 668. 47
Value of plant, materials, etc., on hand June 30, 1934------------                                                                                               550. 74

      N...Net                         ---------------------------
           total cost to June 30, 1934.______________     __                                                                                                874, 219. 21
Minus accounts payable June 30, 1934--------------------------                                                                                              173, 720. 87
     Net total expenditures     -----------------------------                                                                                               700, 498. 34
Unexpended balance June 30, 1934-__                                                                                                                      2, 099, 501. 66
           Total amount appropriated to June 30, 1934_____________                                                                                       2, 800, 000. 00

    Fiscal year ending June 30                              1930                           1931                     1932                     1933                   1934


Cost of new work---__________                          -_____--____..____
                                                                      .-----------                                                  --------                    _$873, 668. 47
Cost of maintenance
                  ...                                        --------------
Total expended        -------                          --                 ----                    -----                                 --------                   700, 498. 34
A llotted ------- ..............
                         _       .....                                           -.           ---         ...                                ..-                 2, 800,000.00

   1 Exclusive of available funds.
716          REPORT OF           CHIEF OF ENGINEERS,                 U. S. ARMY,             1934

Amount allotted from National Industrial Recovery Act approved
  June 16, 1933_--                                                2, 800, 00. 00
                                                                 $-------------
Gross amount expended--         --------------     $700, 576. 63
Less reimbursements collected-------------------          78. 29
                                                                     700, 498. 34

      Balance unexpended June 30, 1934      ------------------                                2, 099, 501. 66
Outstanding liabilities June 30, 1934-------------      4, 584. 00
Amount covered by uncompleted contracts----        2, 043,110. 76
                                                                                              2, 047., 694. 76

         Balance available June 30, 1934------------------------                                    51, 806. 90

       CONSOLIDATED COST AND FINANCIAL SUMMARY FOR UNITED STATES FUND)S

Cost of new work to June 30, 1934___------------------------ $1, 558, 848. 47
Cost of maintenance to June 30, 1934--- -----------------          9, 590. 80

      Total cost of permanent work to June 30, 1934--------- 1, 568, 439. 27
Value of plant, materials, etc., on hand June 30, 1934-----------    409. 39

      Net total cost to June 30, 1934--                                                        , 568, 848. 66
                                                                                              1--------------------
Plus accounts receivable June 30, 1934------------------------                                          16. 43

      Gross total costs to June 30, 1934---------------------- 1, 568, 865. 09
Minus accounts payable June 30, 1934------------------------173, 729. 01
     Net total expenditures                                                                    , 395, 136. 08
                                                                                              1-----------------------------
Unexpended balance June 30, 1934 ----------------------                                       2, 108, 607. 84
         Total amount appropriated to June 30, 1934------------                               3, 503, 743. 92

   Fiscal year ending June 30            1930           1931           1932           1933             1934


Cost of new work__-.........          -_$8,966.89      (5, 338.27     $4, 225. 76       $11.40       $873,668.47
Cost of maintenance-......           .__----.------.----.-------------------
                                  _.---                                             - 4, 459. 11        5, 131. 69
      Total cost     --------- ----      8, 966. 89     5, 338. 27    4, 225. 76      4, 470. 51      878, 800. 16
              ....
Total expended----------------          10, 501. 26     5, 928. 96    2, 336. 00      3, 688. 57      705, 789. 09
Allotted -------- __-----------        -6, 250. 00      9, 000. 00   -5, 000. 00      8, 498.64     2, 804, 081.50


Balance unexpended July 1, 1933----------------------------                                        $10, 315. 43
Amount allotted from War Department Appropria-
tion Act approved Apr. 26, 1934-----------------$5, 200. 00
Amount allotted from
                   : National Industrial Recovery
Act approved June 16, 1933------------------2, 800, 000. 00
                                                                                              2, 805, 200. 00
     Amount to be accounted for-------------------------                                      2, 815, 515. 43
Deductions on account of revocation of allotment-----------                                        1, 118. 50
      Net amount to be accounted for----------------------2,                                       814, 396. 93
Gross amount expended------------------------- 706, 562. 73
Less reimbursements collected__---------------------         773. 64
                                                                                                   705, 789. 09
      Balance unexpended June 30. 1934-------------------- 2, 108, 607T. 84
Outstanding liabilities June 30, 1934--------------  4, 607. 16
Amount covered by uncompleted contracts-------- 2, 043. 110. 76
                                                                2. 047, 717. 92'
         Balance available June 30, 1934---......------                                             60. 8<9. 92
                  RIVERS AND HARBORS-GALVESTON,                                               TEX., DISTRICT                             717

Accounts receivable June 30, 1934____                                                                            __                  $______________
                                                                                                                                     $16. 43

            Unobligated balance available June 30, 1934_____                                                   ____               6-- 906. 35
                                                                                                                                  60,

Amount (estimated) required to be appropriated for completion of
                                                                                      - - - - -
existing project 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -                                         321, 500. 00

Amount that- can be profitably expended in fiscal year ending
June 30, 1936:
   For new work      ------------------------------------                                                                     321, 500. 00
   For maintenance 1       -------------------------------                                                                    110, 000. 00

            Total 1---------------------                                                                                     431, 500. 00

                                                        CONTRIBUTED FUNDS

Cost of new work to June 30, 1934--------------------------   393, 286.91
Cost of maintenance to June 30, 1934__  ___---------        ------------

     Total cost of permanent work to June 30, 1934 ------     393, 286. 91
Minus accounts payable June 30, 1934-------------------------          .60

     Net total expenditures--_ ---------------------------                                                                    393, 286. 31
Unexpended balance June 30, 1934_           _                                                                                   2, 373. 64

           Total amount contributed to June 30, 1934----------                                                                395, 659. 95

           Fiscal year ending June 30                                 1930        1931            1932              1933              1934


Cost of new work......------------------------------                            $3, 992.69     $2, 213.66 $131,018. 77             $132, 913.94
Cost of maintenance--------------                           --------------------------------------------------
Total expended              ---------------------------------                    2, 339.08      3, 324. 23       98,482.94          165, 778.39
Contributed---....--------------------------.......................     -----   30, 000. 00   .....---...-------....23, 000. 00    -- 11, 340. 05


Balance unexpended July 1, 1933_
                               --------------------------                                                                  $179, 492. 08
Deductions on account of refund to local interests ------------                                                              11, 340. 05

      Net amount to be accounted for     ____                            152. 03
                                                              -168,1-------------
Gross amount expended____-------------             $166, 007. 29
Less reimbursements collected_- ----- __----------       228. 90
                                                                   165, 778. 39

      Balance unexpended June 30, 1934________________-----                                                                        2, 373. 64
Outstanding liabilities June 30, 1934__-,__-------------                                                                               21. 00

           Balance available June 30, 1934____________                                                       ____                  2, 352. 64
CONSOLIDATED COST AND FIINANCTL                                  SUMMARY FOR RAZOS                     ISLAND HARBOR, TEXAS

Cost of new work to June 30, 1934-------------------------- $1, 952, 135. 38
Cost of maintenance to June 30, 1934--------------------------    9, 590. 80

      Total cost of permanent work to June 30, 1934           .-- __--
Value of plant, materials, etc., on hand June 30, 1934 .........
                                                                                                                 - 1, 961, 409.
                                                                                                                           726. 18
                                                                                                                                39

      Net total cost to June 30, 1934 _____  _______________   1, 962, 135. 57
Plus accounts receivable June 30, 1934 -------------------------        16. 43

      Gross total costs to June 30, 1934______________________                                                           1, 962, 152. f0
Minus accounts payable June 30, 1934_______________________                                                                 173, 729. 61

     Net total expenditures.    --------------------------                                                               1, 788, 422. 39
Unexpended balance June 30, 1934___________________________                                                              2, 110, 981. 48
           Total amount appropriated and contributed to June 30,
            1934-------.-        _      -   -----                3, 899, 403. 87
   1Exclusive         of available funds.
718          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                           1934


   Fiscal year ending June 30                       1930            1931              1932                1933               1934


Cost of new work-................   $8, 966. 89                   $9, 330. 96        $4, 867. 86       $131, 030. 17    $1, 006, 582. 41
Cost of maintenance ____ __________________--                                                             4, 459. 11          5, 131. 69
      Total cost----... -      ---       __    -_8, 966. 89         9, 330. 96        4, 867. 86        135, 489. 28     1, 011, 714. 10
Total expended ..-------------                 10, 501. 26          8, 268, 04        5, 660. 23        102, 171. 51       871, 567. 48
Allotted and contributed....--------          -6,    250. 00     39, 000. 00       -5, 000. 00         261, 498. 64      2, 792, 741. 45


Balanice unexpended July 1, 1933---------    --------------            $189, 807. 51
Amount allotted from War Department Appropria-
  tion Act approved Apr. 26, 1934-----------------        $5, 200. 00
Amount allotted from National Industrial Recovery
  Act approved June 16, 1933 --------------    __ 2, 800, 000. 00
                                                   -.------           2,805, 200. 00

      Amount to be accounted for__   ----
                                       __
Deductions on account of refund and revocation of allotment .-
                                                                             -____------                         2, 995, 007. 51
                                                                                                                     12, 458. 55

      Net amount to be accounted for ________-     ____    ___       2, 982, 548. 96
Gross amount expended__        -__________________ $872, 570. 02
Less reimbursements collected                             002. 54
                                                       1---------------------
                                                       1,
                                                                        871, 567. 48

      Balance unexpended June 30, 1934__ _________--_- --          2, 110, 981. 48
Outstanding liabilities June 30, 1934_____________      4, 628. 16
Amount covered by uncompleted contracts--------- 2, 043, 110. 76
                                                                   2, 047, 738. 92

     Balance available June 30, 1934                                                                                        242. 56
                                                                                                                        6------------------3,
Accounts receivable June 30, 1934 ..-----------------------------                                                             16. 43

        Unobligated balance available June 30, 1934_                                               -                    63, 258. 99

Amount (estimated) required to be appropriated for completion
of existing project 1_____________________________                                                                    321, 500. 00
Amount that can be profitably                              expended in fiscal year ending
June 30, 1936:
      For new work 1-----------------                                                                                  321, 500. 00
     For maintenance 1_________                                ________________________                                110, 000. 00
                  1 ---.--------------                     -Total                                                      431, 500. 00


    17. EXAMINATIONS, SURVEYS, AND CONTINGENCIES (GENERAL)

   The cost of work during the year amounted to $53,874.44; the
expenditures were $56,273.12. The ,balance unexpended June 30,
1934, will be applied as needed during the fiscal year 1935, to pay-
ment of expenses to be incurred in connection with the above items.
The additional sum of $30,000 can be profitably expended during the
fiscal year ending June 30, 1936.
  1 Exclusive of available funds.
                 RIVERS AND HARBORS-GALVESTON                                           TEX.1 DISTRICT                       719
                                             Cost and financial summary
Cost of maintenance to June 30, 1934__----------------------                                                     $182, 894. 67
Value of plant, materials, etc., on hand June 30, 1934_ .--------                                                   5, 150. 51

      Net total cost to June 30, 1934___                      -   1------------
                                                                        045. 18                                  188,
Plus accounts receivable June 30, 1934---------------------------371.         36

      Gross total costs to June 30, 1934-----------------------                                                   188, 416. 54
Minus accounts payable June 30, 1934 ------------------                                                             1, 868. 19

     Net total expenditures-----   --------------------------                                                     186, 548. 35
Unexpended balance June 30, 1934__                                                                                 99, 779. 81

           Total amount appropriated to June 30, 1934--------------                                                   286, 328. 16

           Fiscal year ending June 30                          1930          1931          1932           1933             1934


Cost of new work----....--               -------------------
Cost of maintenance.......----..............------------   $8, 180. 66   $13, 541. 12   $53, 029. 11   $36, 974. 51      $53, 874. 44
Total expetded-----......--------------------               8, 180. 66    13, 470. 70    54, 498. 39    36, 980. 47       56, 273. 12

Allotted. ------------------------                         11, 000.00     10,000.00      55, 000. 00    41, 587. 19      133, 740. 97


Balance unexpended July 1, 1933__                 __         ___     $22, 311.96
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934 -___ -__________-- ----     $20, 000. 00
Amount allotted from War Department Appropriation
Act approved July 14, 1962             -         -
                                                -________________
                                                         93, 000. 00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933 -------- -----------          21, 188. 04
                                                                     134, 188. 04
      Amount to be accounted for -- ________--____________ 156, 500. 00
Deductions on account of revocation of allotment------- ..------------ 447. 07
       Net amount to be accounted for ....- __     ____-----------_ 156, 052. 93
Gross amount expended --------------------------           58, 729. 26
Less :
    Reimbursements collected ------------      $2, 409. 14
        Receipts from sales------------                                      - -47. 00
                                                                                                   2, 456. 14
                                                                                                                       56, 273. 12
      Balance unexpended June 30, 1934_.......____---------                                                            99, 779. 81
Outstanding liabilities June.30 1934___---------_ -.--                                                                  1, 903.46
      Balance available June 30, 1934_         ,_         ...-                                                         97, 876. 35
Accounts receivable June 30, 1934__________------------__                                              -__-_               371. 36
            Unobligated balance available June 30, 1934--..------------                                                98, 247...71
Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance-- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -                        -
                                                                                                                       30, 000.00

    1 Exclusive of available funds.




           91536--ENG 1934--46
720           REPORT        OF CHIEF OF ENGINEERS,                        U.      S. ARMY,             1934

                   18. Other projects for which no estinmates are submitted
                       [Commercial statistics for these projects are given in pt. 2 of report]

                                                             For last   Cost and expenditures to
                                                             full re-         June 30, 1934                     Estimated
                     Name of project                         port see                                           amount re-
                                                             Annual                                              quired to
                                                             Report     New work             Maintenance         complete
                                                              for-

1.   Turtle Bayou, Tex.1... ------------------------
                                    .                           1932        $8, 899.    97     $57, 685.   83   Completed.
2.   Johnsons Bayou, La. -----------------------
                                .                               1933        2 2, 261.   35      54, 042.   26       Do.
3.   Mouth of Trinity River, Tex. ----------------              1928        79, 540.    44      10, 870.   95       Do.
4.   Trinity River, Tex.------------------------                1932    2, 002, 661.    37     352, 680.   90       Do.
5.   Dickinson Bayou, Tex........---------------------          1931          6, 287.   28      55, 553.   83       Do.
6.   Chocolate Bayou, Tex.1_--------------------                1922          6, 512.   12      33, 248.   17   $8,500.
7.   Brazos River, Tex., from Velasco to Old Wash-              1924       216, 989.    48     223, 010.   52   Completed.
       ington.'
8. Bastrop Bayou, Tex.'t...-----------------------
                                    1                           1931         9, 920.22          27, 129. 21     $10,000.
9. Guadalupe River to Victoria, Tex.               _-------------1922     172, 547. 28         106, 100. 36     Completed.

     I Channel adequate for commerce.
     2 Revoked during fiscal year 1934, $986.72.


        19. FLOOD CONTROL, RIO GRANDE, NEAR SAN BENITO, TEX.

   Location.-The territory embraced by this emergency project in-
cluded the whole of the lower Rio Grande Valley from Mission,
Tex., to the Gulf of Mexico.
   Existing project.-No project has been authorized by Congress.
An emergency flood-control project was authorized with funds allotted
by the Public Works Administration under the National Industrial
Recovery Act approved June 16, 1933. The project provided for
doing all things necessary for protection of life and property in
the threatened area.
   The necessary work for immediate flood protection in the lower
Rio Grande Valley was carried out during the months of September
and October 1933 by an emergency organization and consisted of
patrolling the levees on the American side of the river and flood
ways, location and closing of culverts, locating and tamping cracks,
reinforcing levees and threatened banks with sandbags, topping
with sandbags, stopping erosion with brush and bags, sacking of
roads across levees, and placing gates to close threatened siphons.
   The El Fusti syphon at a point where it crosses the Arroyo Colo-
rado near Mercedes was threatened with destruction by undercutting
on the downstream side, and, to prevent this, about 600 tons of stone
riprap were placed just below the siphon to stop the eroding action
of the flood waters.
   As this was a temporary project, and all danger for the particular
period for which the instructions were issued has passed, no further
work is required.
   Operations and results during fiscal year.-During very high
stages in the river, the levees on the river and flood ways were re-
paired and patrolled, all drainage outlets located and closed, erod-
ing banks were located and protected with brush and sandbags, low
places along the levees where roads and highways crossed were
closed with bags filled with earth, all at a cost of $40,933.84. During
October 1933 the El Fusti syphon across the main flood way. 1
mile south of Mercedes, Tex., was protected against undermining
by placing about 400 tons riprap on the downstream side at a
cost of $900.
              RIVERS AND HARBORS-GALVESTON,                                            TEX. 1 DISTRICT                   721
   The total cost of all work with Public Works funds was $41,833.84.
The total expenditure was $41,833.84.
   Condition at end of fiscal year.-The emergency work was com-
pleted during November 1933. Although the work was assigned
only a few days before the river had reached its highest stages, prac-
tically no damage was done to this area.
   As the work was an emergency measure, no maintenance work or
repa rs were made to the damaged levees,banks, roads, etc.
   The total cost and expenditures to the end of the fiscal year
amounted to $41,833.84, all from Public Works funds.
   Proposed operations.-The balance unexpended at the end of the
year, amounting to $166.16, has been recommended for revocation.
                                     Cost and financial summ-ary

Cost of new work to June 30, 1934__--------___                                             __----_            $41, 833. 84
Cost of maintenance to June 30, 1934_       ___                                                           .     ....

         Total cost of permanent work to June 30, 1934_.............                                           41, 833. 84


                   'balance
Net total expenditures--------- ---------------------------
Unexpended         June 30, 1934_--------------------------
                                                                                                               41, 833. 84
                                                                                                                   166. 16
         Total aiount appropriated? to June 30,i1934_____________-42, 00000

         Fiscal year ending June 30                            1930            1931       1932         1933         1934


                           ---------
Cost ofnew work-------------..........  ------------------------------------                                     $41, 833. 84
Cost ofmaintenance                    ------------  ----                                ---------------------------------
Total expended-----__         ------------------------------            _-__                                       41, 833. 84

Allotted. -----    --- -      ----------- --------                     ----------------------------------          42, 000. 00


Amount allotted from National Industrial Recovery Act approved
June 16, 1933----------------------------------------           $120, 000. 00
Deductions on account of revocation of allotment----------------   78, 000. 00

                                    ---------------
      Net amount to be accounted for_                                                                          42, 000. 00
Gross amount expended_____________                $41,.835.54
Less reimbursements collected ___-___------------        1. 70
                                                                                                               41, 833.84

         Balance unexpended June 30, 1934-___---___-----_                                                          166. 16

Status of reports called for by river and karbor acts and committee resolutions


        Locality              Authorization ac                    Transmitted         Document number         Recommenda-
                                                                  to Congress                                     tion

Aransas Pass, Port         Rivers and Harbors
Aransas, Rockport,
and Corpus Christi
 (vicinity on coast of
                             Committee resolu-
                             tion, May 14, 1934.                ---------------
Texas). -...
Aransas Pass to Corpus Rivers and Harbors
Christi, Tex., in vi-   Committee resolu-
cinity of Rockport.     tion, July 27, 1934.
                       River and Harbor
Baffins Bay, Tex__....__
                         Act, Jan. 21, 1927.
Brazos River, Tex., up ....do         ..---------------
                                                    Sept. 16, 1933 _                    I Unfavorable.
                                                                       .--------------------.
to Rosenberg.
Brazos River up to Rivers and Harbors Feb. 14, 1934 Rivers and Harbors Favorable.
  Velasco, Tex.          Committee resolu-                           Committee 29, 73d
                         tion, July 3, 1933.                         Cong., 2d sess.
722            REPORT OF CHIEF OF ENGINEERS,                                     U. S. ARMY,                                                  1934

Status of reports called for by river and harboracts and committee resolutions-
                                     Continued


         Locality                    Authorization act
                                                               Transmitted          Document number                                             Recommenda-
                                                               to Congress                                                                          tion


Clear Creek and Clear              River and Harbor       Feb. 15, 1934          House 264, 73d Cong.,                                          Favorable.
  Lake, Tex.                         Act, July 3, 1930.                           2d sess.
Colorado River, Tex.,              Rivers and Harbors     Feb. 28, 1934          ...-----------------                                           Unfavorable.
  improvement for 9-foot             Committee resolu-
  navigable channel.                 tion, Dec. 17, 1931.
Colorado River, Tex.,              Rivers and Harbors Jan. 19, 1934              Rivers and Harbors                                             Favorable.
  prevention of silt de-             Committee resolu-                             Committee 26, 73d
  posits in Matagorda                tion, Julyl19; 1933.                          Cong., 2d sess.
  Bay.
Corpus Christi to Point            River and Harbor
  Isabel, Tex., intra-               Act, Jan. '21, 1927.
  coastal waterway, in-
  cluding Arroyo, Colo.,
  to Missouri Pacific
  bridge near Harlingen.
Galveston Bay, Tex.,               River and Harbor            June   5, 1.934 House 400, 73d Cong.,                                                 Do.
  beach erosion.                     Act, July 3, 1930.                            2d sess.
Galveston Harbor, Tex.,            Rivers and Harbors          June 15, 1934   Rivers and Harbors                                                    Do.
  to Texas City, Tex.,               Committee resolu-                             Committee 46, 73d
  channel.                           tion, Jan. 5, 1934..                          Cong., 2d sess.
Galveston West Bay                 River    and Harbor         July   8,1933 ........................                                           Unfavorable.
  and adjacent waters,               Act, July 3, 1930.
  Tex.
Guadalupe River, Tex.              Flood Control       Act                      ..........................
  (preliminary examina-              May 31, 1924.
  tion for flood control).
Guadalupe River, Tex__             River and Harbor
                                     Act, Mar. 3, 1925.
Guadalupe River, Tex.,             River and Harbor
and channel in San                  Act, July 3,1930.
Antonio Bay connect-
ing Guadalupe River                                                                        --   --
                                                                                                 - -- -- --   -   -   -   -   -   --- -   -

  with intracoastal
  waterway.
Louisiana and Texas                 .. do      . .. . .-..
intracoastal waterway
from Corpus Christi
to the Rio Grande
Valley.
Louisiana-Texas Intra-             Rivers and Harbors          Nov.   4,1933                                                                         Do.
coastal Waterway                    Committee resolu-
                                     tion, Jan. 19, 1932.
Lynns Bayou, Tex .....             Rivers and Harbors
                                     Committee resolu-
                                     tion, Sept. 1, 1934.
Offatts Bayou, Tex ....            River and Harbor            July 10, 1933                ---- ----                     ----------                 Do.
                                     Act, July 3, 1930.
Port Aransas, Tex..                Rivers and Harbors          Apr. 24, 1934    Rivers and Harbors                                              Favorable.
                                     Committee resolu-                            Committee 40, 73d
                                     tion, Nov. 21, 1933.                         Cong., 2d sess.
Sabine-Neches  Water-              Senate Committee res-       Nov. 24, 1933                                                                    Unfavorable.
  way and Port Arthur                olution, Mar. 16,
  Canal.                             1933.
Sabine-Neches  Water-              Rivers and Harbors
way, Tex.                           Committee resolu-
                                     tion, Mar. 19, 1934.
Sabine River, La. and              Rivers and Htarbors         Sept. 14, 1933                                                                        Do.
  Tex.                               Committee resolu-
                                     tion, Apr. 21, 1932.
Trinity River, Tex.,               River and Harbor
   flood protection.                 Act, July 27, 1916.
Trinity River,       Tex.          Flood Control Act,
  (preliminary examina-               May 31, 1924.
tion for flood control).
Trinity River, Tex .....           River and Harbor
                                     Act, July 3, 1930.
   Do    .----- -      -------     Senate Committee res-
                                     olution, Dec. 10, 1929.
Turtle Bayou, Tex .....            River and Harbor            Mar.   3, 1934                                                                        Do.
                                     Act, July 3, 1930.
   D o ---   . ----- .----   ...   Rivers and Harbors
                                     Committee resolu-
                                    tion, Feb. 2, 1934.
        RIVERS AND     IIARBORS--VICKSBURG,           MISS.,      DISTRICT              723

  IMPROVEMENT OF RIVERS AND HARBORS IN THE
          VICKSBURG, MISS. DISTRICT
  The streams under improvement in this district are tributaries of
the Mississippi River which flow through northwestern Mississippi,
southern Arkansas, southern Oklahoma, northern Texas, and the
northern half of the State of Louisiana.
  District engineer: Maj. Thomas B. Larkin, Corps of Engineers,
to October 28, 1933; Maj. Clark Kittrell, Corps of Engineers, from
October 28 to November 13, 1933; Maj. Lunsford E. Oliver, Corps
of Engineers, since that date.
  Division engineer: Brig. Gen. H. B. Ferguson, Corps of Engineers.
                                 IMPROVEMESNTS

                                 Page                                                   Page
1. Red River below Fulton,               7. ]Bayous D'Arbonne and Cor-
     Ark                     _    723           ney, La      -         --                738
2. Cypress Bayou and Water-              8.   Yazoo River, Miss                          740
     way between Jefferson,              9.   Yalobusha River, Miss                      742
     Tex., and Shreveport, La_    726   10.   Big Sunflower River, Miss__                744
3.Ouachita and Black Rivers,            11.   Operating and care of lock
     Ark. and La__        _       728           and   dam,       Big        Sunflower
4. Operating and care of locks               River', Miss                                746
    and dams, Ouachita River,           12. Mouth of the Yazoo River,
     Ark. and La ----------
                         _        732            Miss___ -748
5. Tensas   River and Bayou             13. Examinations, surveys, and
     Macon, La _--_   _           734         contingencies (general)                    749
6. Boeuf River, La     --        736   14. Other projects for which no
                                              estimates are submitted__                  750

                1. RED RIVER      BELOW FULTON,           ARK.

   Location.-Red River rises in the arid regions of eastern New
Mexico, flows in a general easterly and southeasterly direction for
1,300 miles and enters the Mississippi River at Red River Landing,
La. (See U. S. Geological Survey State maps.)
   Previous projects.--The project was adopted May 23, 1828. Modi-
fications were made June 10, 1872, June 18, 1878, March 3, 1879,
August 2, 1882, July 5, 1884, August 11, 1888, and September 19,
1890. The cost and expenditures before existing project was adopted,
July 13, 1892, were $1,553,877.50, for new work. For further details,
see page 1868 of Annual Report for 1915.
   Existing project.-This provides for continuing improvement of
Red River from Fulton, Ark., to the Atchafalaya River, La., 463
miles by systematic clearing of the banks, snagging, dredging shoals,
building levees (either alone or in cooperation with riparian States),
closing outlets, revetting caving banks, and preventing injurious
cut-offs. The lower end of the section included in the project is 7.6
miles above the mouth of the river. No proposed channel dimensions
were given.
   Floods ordinarily cause fluctuations of stage between high and low
water of from 30 to 45 feet. Unusual floods occasionally increase
this range about 10 feet.
   The work being continuous, no estimate for completion was made.
The latest (1933) approved estimate for annual cost of maintenance
is $75,000.
   The existing project was adopted by the River and Harbor Act of
July 13, 1892 (Annual Reports for 1890, p. 1829, and for 1891,
724     REPORT     OF    CHIEF OF ENGINEERS,       U.   S.   ARMY,   1934


p. 1957).    (For latest published map see H. Doc. No. 848, 65th Cong.,
2d sess.)
  Terminal facilities.--Red River Barge Line owns a warehouse at
Moncla Landing. The city of Alexandria, La., has constructed a
warehouse for receiving steamboat freight. Both of these ware-
houses are open to the general public.
  Operations and results during fiscal year.--From October 5 to 17,
1933, the U. S. dredge Todd removed 95,904 cubic yards of material
from the channel near the mouth of Kings Bayou.
  From June 9 to 30, 1934, the U. S. dredge Waterway removed
124,634 cubic yards of material from the channel at the mouth of
Old River, Texas & Pacific Railroad Bridge and the mouth of Kings
Bayou.
  From August 21 to October 21, 1933, U. S. quarterboat No. 5
removed 6,563 obstructions from the channel between Shreveport,
La., and the mouth of Black River, a distance of 271.5 miles.
  This work is classed as maintenance and was all done by hired
labor.
Cost of dredging        -------------------------------------------      $19, 335. 05
                 ----
Cost of chopping___         -.----   ---------                               5, 638. 92
Cost of channel surveys and gage observations                          056. 77
                                                                    1-----------
                                                                    1,

      Total cost of maintenance----------      ------------------- 26, 030. 74
Total expended ______--_______-.__---------29,                         956. 10
   Condition at end of fiscal year.-The work under the existing
project being continuous and no estimate being made, the date or
percentage of completion cannot be stated. From January to July
the prevailing stage is 6 feet and over, and minimum depths are
about 4 feet to Fulton, Ark., 5 feet to Shreveport, La., and 6 feet to
Alexandria, La. During the remainder of the year stages near zero
may be expected, with minimum depths less than 1 foot from Fulton
to Shreveport, 1 to 2 feet from Shreveport to Alexandria, 4 feet
from Alexandria to the mouth of Black River, and 6.5 feet thence
to the mouth. The controlling depth at the end of the fiscal year
was 8.5 feet to the mouth of Black River and about 1 foot from there
to Fulton, Ark.
Cost of new work under existing project to June 30, 1934_-----         $409, 928. 91
Cost of maintenance                        --------------------          462, 177. 59
                                                                      1,------------
      Total cost                                                       , 872, 106.50
                                                                      1---------------------------
Total expended----------------------------------                      1, 960, 722.88
  Proposed operations.-The balance unexpended plus accounts re-
ceivable at the end of the year will be applied to maintenance using
Government plant and hired labor as follows:
Accounts payable June 30, 1934      _      -   -----        $32, 292. 58
Maintenance :
   Dredging to mouth of Black River with U. S. pipe-
      line dredge Waterway, 2 months (September and
      October 1934) -----------------                  $33000. 00
   Chopping, mouth of Black River to Shreveport, La.,
      with U. S. quarterboat No. 5, 21/2 months (last
      half July, August, and September 1934) ---------- 12, 000. 00
                                                                           45, 000.00
        Total for all work_---------                                      77, 292.58
Balance remaining_ --------------                                         39, 832. 79
      Total-----                                                         117,125. 37
              RIVERS AND HARBORS-VICKSBURG,                                 MISS., .DISTRICT                   725
  The additional sum of $55,000 can be profitably expended during
the fiscal year 1936, using Governmnent plant and hired labor, as
follows:
Maintenance:
   Dredging to mouth of Black River with U. S. pipeline dredge
      Waterway, 2 months (September and October) -------------- $33, 000
   Chopping, mouth of Black River to Shreveport, La., with U. S.
      quarterboat No. 5, 5 months (July to November 1935)        22, 000               -----------
             Total------------                  ----------------------------------                          55, 000

                                         Cost and financial summary

Cost of new work to June 30, 1934_-----------------------$1, 963, 806. 41
Cost of maintenance to June 30, 1934-------- -------------- 1, 462, 177. 59

      Total cost of permanent work to June 30, 1934---------- 3, 425, 984. 00
Value of plant, materials, etc., on hand June 30, 1934----------- 90, 492. 77

      Net total cost to June 30, 1934  ----------------------                                     3, 516, 476. 77
Plus accounts receivable June 30, 1934------------------------                                        30, 416. 19

     Gross total costs to June 30, 1934--------------- ----  3, 546, 892. 96
Minus accounts payable June 30, 1934 -----------------------     32, 292. 58

     Net total expenditures-----------------------------                                         3, 514, 600. 38
Unexpended balance June 30, 1934--------------------------                                          114, 871. 74

         Total amount appropriated to June 30, 1934--------- ----                                 3, 629, 472. 12

   Fiscal year ending June 30               1930           1931           1932 '          1933              1934


C ost of new work-----
Cost         work-... .      .   . .        . . . . . . . . -------------
                                          . ------------------------ . . . . .- . .-               . - . .-        -
Cost of maintenance.......------------    $52, 635. 74   $42, 108. 91   $71, 908. 31    $34, 380. 90      $26, 030. 74

Total expended------------------           61, 492. 17   101, 238. 43    72, 922. 94     21, 296. 40      -29, 956. 10

Allotted..------------------- --          112, 600. 00   162, 500. 00   -7, 770. 96      23, 957. 14      -10, 445. 97


Balance unexpended July 1, 1933 -------------    -----                                                 $95, 361. 61
Amounted allotted from War Department Appropriation Act ap-
  proved Apr. 26, 1934------------------------------------                                              30, 000. 00

      Amount to be accounted for--------------------------                                             125, 361. 61
Deductions on account of revocation of allotment---------------                                         40, 445. 97

      Net amount to be accounted for------------------------84,                                             915. 64
Gross amount expended    ---------------------              $155, 053.16
Less reimbursements collected--------------- ----            185, 009. 26
                                                                                                   -29,     956. 10

      Balance unexpended June 30, 1934--------------------- 114, 871. 74
Outstanding liabilities June 30, 1934                  025. 56
                                                    8,---------------
Amount covered by uncompleted contracts------------ 3, 725. 00
                                                                      11, 750. 56

     Balance available June 30, 1934-----------------------10, 121.18
Accounts receivable June 30, 1934------------------------------ 30, 416. 19

         Unobligated balance available June 30, 1934--------------                                     133, 537. 37
Amount that can be profitably expended in fiscal year ending June
                            - -- -- - - - - - - -- - - - - - - - - -- - - -- - - - -
30, 1936, for maintenance                                                                              55, 000. 00

  SExclusive of available funds.
726     REPORT OF CHIEF OF ENGINEERS,           U.   S.   ARMY,   1934

2. CYPRESS BAYOU      AND WATERWAY BETWEEN JEFFERSON, TEX.,
                        AND SHREVEPORT, LA.

  Location.-This bayou rises in northeast Texas and flows in a
southeasterly direction to Caddo Lake, through this lake to Big
Willow Pass, and through Big and Little Willow Passes, Soda Lake,
Twelve Mile Bayou, the new diversion canal, and Cross Bayou to the
Red River at Shreveport, La., a distance of about 132 miles. (See
U. S. Geological Survey State maps.)
  Strictly speaking, Cypress Bayou proper ends where it enters
Caddo Lake, but the name is frequently applied to the whole water-
way above described.
  Existing project.-This provides for dredging and straightening
the channel, removing obstructions, and clearing the banks in the
lower 66 miles of Cypress Bayou from the Red River at Shreveport,
La., to Jefferson, Tex., and for the construction of a dam without a
lock at the foot of Caddo Lake.
                              CADDO LAKE I)AM


  Location: At foot of Caddo Lake, La. and Tex., about 23 miles above mouth
of Jefferson-Shreveport Waterway.
  Below Mooringsport, La.: 2 miles.
  Length: 3,400 feet.
  Type: Fixed, on pile foundation.
  Date of completion: December 21, 1914.
  Cost : $100,553.47.
   Below the dam the fluctuations of the water level depend chiefly
upon backwater from the Red River, the maximum being about 10
feet. At the dam the fluctuations are from zero to 8 feet above the
crest of the spillway, and at Jefferson the maximum is 24.2 feet. The
estimate of cost for new work was $20,000 for open-channel work
 (Annual Report, 1872) and $100,000 for the dam (1907). The latest
 (1933) approved estimate for annual cost of maintenance is $1,700.
   The existing project was authorized by the following river and
harbor acts: The act of June 10, 1872, provided for open-channel
work (Annual Report for 1872, p. 572); the act of June 25, 1910,
provided for the construction of the dam (H. Doc. No. 220, 60th
Cong., 1st sess.). The latest published map is in House Document
No. 236, Sixty-third Congress, first session.
   Terminal facilities.-There are 5 private wharves and landings at
Mooringsport and 1 wharf at Jefferson. They are adequate for the
existing commerce.
   Operations and results during fiscal year.-The work consisted of
caring for the Caddo Lake Dam. The cost was $1,159.75 and the
expenditure $1,142.35, all for maintenance.
   Condition at end of fiscal year.-The dam at the foot of Caddo
Lake was completed in 1914, completing the project. Its construc-
tion and maintenance insures a 4-foot navigable depth at low water
from that point to Jefferson, but cuts off all possible navigation to
Shreveport except for such light draft boats as may pass over the
dam at high stages. Below the dam navigation is largely dependent
on backwater from Red River. A stage from 15 to 24 feet on the
                  RIVERS AND HARBORS-~VICKSBURG,                                                  MISS.,_ DISTRICT                          727
Red River. gage at Shreveport, depending on the run-off from the
Cypress Bayou drainage area, is necessary to provide a 4-foot depth
up to the dam.. Such stages are short in duration and irregular in
occurrence. The controlling depth between the dam and Jefferson
was 4 feet at the end of the fiscal year.
  The total cost and expenditures under the existing project to June
30, 1934, have been as follows:

                                                                                         United States Contributed                     Total
                                                                                             funds       funds

Cost of new work......
                     -----------------------------------                                      $202,817.48     --------------          $202,817.48
Cost of maintenance....................                              ...                       233, 535. 43
                                                                                .....----------------------------------
                                                                                                                     $50,000.00        283, 535. 43
                       .....-________._______
        Total cost-____-...                                              .             .__ 436, 352. 91            50, 000. 00         486, 352. 91
Total expended-------------------------------------436,                                            310. 46         50, 000. 00         486, 310. 46


     Proposed operations.-The balance unexpended will be applied to
maintenance, as follows:
Accounts payable June 30, 1934---------------------------------                                                                         $42. 45
Maintenance :
    Salary for dam tender--           -----------         , 260. 00
                                                        $1------
    Miscellaneous work-------------------------------       440. 00
                                                                                                                                      1, 700. 00
      Total for all work                                                                                                                 742. 45
                                                                                                                                      1---------------------------
Balance remaining--      ----------------------------------------                                                                        579. 61

             Total-----                -------------------                                                                            2,322. 06
   The additional sum of $1,700 can be profitably expended during the
fiscal year 1936, as follows:
Salary for dam tender----           --------------------                                                                                $1,260
Minor items of work-------------------------------------------                                                                             440

            Total              ------------------------------------------------                                                           1, 700

                                                Cost and ftinancia summary

Cost of new work to June 30, 1934---                                           ---------------------- $202, 817.48
Cost of maintenance to June 30, 1934-_-                                        ---------------------   233, 535. 43

      Total cost of permanent work to June 30, 1934------------ 436, 352. 91
Minus accounts payable June 30, 1934---------------------------       42. 45

     Net total expenditures------------------------------436, 310. 46
Unexpended balance June 30, 1934----------------------------2, 322. 06

            Total amount appropriated to June 30, 1934111111111                                                                   438, 632. 52

           Fiscal year ending June 30                               1930              1931             1932              1933            1934

Cost of new work------                   ----------------                                ----------------------------------
Cost of maintenance.           ----------------------            $9, 128. 73       $1, 446. 52       $1,433. 40         $1, 248. 28     $1, 159. 75

Total expended                                           9, 141. 82
                                .--.-----------------------                          1, 433. 26       1, 557. 40       1, 223. 23         1, 142. 35

Allotted........-------.............-----------------------------------------------............    -6, 000. 00         1, 387. 41         1, 626. 50
728      REPORT OF CHIEF OF ENGINEERS,                  U. S. ARMIY6       1934

Balance unexpended July 1, 1933---------------------------------- $1,837.91
Amount allotted from War Department Appropriation Act approved
  Apr. 26, 1934-------   ------   -----------------------------    1, 700. 00

     Amount to be accounted for       ----------------------------3,537.91
Deductions on account of revocation of allotment ------------------  73. 50

      Net amount to be accounted for             ------------------------ 3, 464. 41
Gross amount expended-_ _-                                     $1, 218.17
Less reimbursements collected                                        5. 82
                                                                    7-------------------------
                                                                               1, 142. 35

      Balance. unexpended June. 30, 1934-----------------------                   2,322. 06
Outstanding liabilities June 30, 1934-----------------------                         31. 50

       Balance available June 30, 1934------------------------2,290.                     56

Amount that can be profitably expended in fiscal year ending June
                            -- - - -   - - - - - - - - - - - - - - - - - - -
30, 1936 for maintenance 1                                               ____    1,700. 00

            3. OUACHITA AND BLACK RIVERS, ARK. AND LA.

   Location.-Ouachita River rises in Polk County, Ark., and flows
about 600 miles in a general southeasterly and southerly direction
through Arkansas and Louisiana. It is joined by Tensas and Little
Rivers at Trinity, La. (Jonesville, La.), below which place it is
called " Black River ", and enters Red River 35.5 miles above its
mouth. (See U. S. Geological Survey State maps.)
   Previous projects.-The project was adopted March 3, 1871. Mod-
ifications were made June 10, 1872, August 14, 1876, and July 5,
1884. The amount expended before existing project was adopted,
June 13, 1902, was $605,802.19 for new work. A separate project
for work in the Ouachita River between Camden and Arkadelphia
was adopted August 11, 1888, and $9,000 was expended on this por-
tion of the river for new work. There was expended on Lock and
Dam No. 7, since eliminated from the project, the sum of $59,265.44,
making a grand total of $674,067.63', all for new work, which also
represents the cost. (For further details, see p. 1869 of the Annual
Report for 1915.)
   Existing project.-This proposes to obtain a navigable depth of
61/2 feet at low water from the mouth of Black River, La., to Cam-
den, Ark., a distance of 351 miles, by the construction of six locks
and dams, with necessary dredging, and to remove logs, wrecks, and
overhanging trees, etc., between mouth of Black River and Arkadel-
phia, Ark., 417 miles.
   The location and description of the locks and dams which are
included in the project are contained in the table following.
  1 Exclusive of available funds.
               RIVERS AND HARBORS-VICKSBURG,                                    MISS.,     DISTRICT                  729

                                                   Distance
                                                    from                               Greatest                   Depth
                                                   town or                   Width     available    Lift at      on miter
No.                      Location                   mouth       mouth        oflock     length       low,          sill at
                                                               ofRiver
                                                                  Black                 for full                  normal
                                                    nearest                 chamber     width       water           pool
                                                    naviga-                             of lock                    level
                                                   ble trib-
                                                    utary


                                          Miles                   Miles       Feet       Fee         Feet          Feet
  2   Harrisonburg, La ..................   1 0. 1                  73. 3         55        268        14. 4               6. 9
  3   Riverton, La------                    1 2.0                  134.0          55        268        14.8                6.5
  4   Monroe, La.---------.     -------   1            24.0        178.1          55        268         8.9                6.5
  5   (terl  tor°Rach, La    _
                             -               1 .6                  208.3          55        268         6. 9               6. 6
  6   Near Felsenthal, Ark--------------      3. 3                 238.7          55        268         9. 7               7. 6
  8   Near Calion, Ark_.----------------   1 10. 5                 297. 5         55        268        13. 5               6. 5


                                                                                                     Year
No.           Location              foundationof
                                    Character      Kind
                                                    dam of            Type of construction         of com-        Cost
                                                                                                   pletion


  2   Harrisonburg, La_ -Piling     in clay    Movable: Concrete Poiree needle dam;                 1921       $470, 394. 69
                                                           steel mitering lock gates.
  3   Riverton, La-......    Piling in sand -. do ----       do ---                                 1920        681, 072. 84
  4   Monroe, La          -.-.. do     -    -_- do ....-
                                                       --    do .--------        ---- -             1915      3 641, 630. 23
  5   Sterlington Reach, Piling in clay.... do          ---
                                                          Concrete Chanoine wicket                  1926       901, 096. 17
        La.                                                dam; steel mitering gates.
  6   Near Felsenthal,       Piling in sand _--do ------.    do _----------    --------             1923       4914, 844. 67
        Ark.
  8   Near Calion, Ark __ Piling in clay-_ - do          ------
                                                             do ------      ---------               1926      5 915, 445. 96

  I  Nearest town.
   2 By river-2 miles by highway.
 :,    am fdailed Aug. 10,;1917 and was rebuiltuder pertarnient nd elit~        approprition for' dperating and
care of canals. Type of dam now is concrete Poiree needle pass and Chanoine wicket weir.
   4 Includes cost of original structure to June 30, 1919 ($559,539.34), and the cost of modifications to permit
elimination of Lock and Dam 7 ($355,305.33).
    5Includes actual cost of original structure to June 30, 1919 ($592,922.43), and the cost of modifications to
permit elimination of Locks and Dams 7 and 9 ($322,523.53).

   Floods ordinarily cause fluctuations of stage from 25 to 45 feet
between high and low water. Extreme floods occasionally increase
this range about 10 feet.
   The latest revised estimate of cost of the system of locks and dams,
made in October 1920, as modified by the actual cost of nos. 2, 3, 4,
and 6, since completed, was $4,576,838.52. The latest (1933) ap-
proved estimate for annual cost of maintaining the improvement by
removing obstructions to navigation between Camden, Ark., and the
mouth of Black River, La., is $100,000. No estimate for maintenance
above Camden has been approved.
   The existing project 'was authorized by the following river and
harbor acts: The act of June 13, 1902, provided for the construction
of Locks and Dams Nos. 4 and 6; the act of March 2, 1907, provided
for Locks and Dams Nos. 2 and 8; the act of June 25, 1910, provided
for obtaining sites for Locks and Dams Nos. 3 and 7; the act of July
25, 1912, for their construction; the act of August 8, 1917, provided
for the construction of Lock and Dam No. 5; and the act of March
2, 1919, provided for modifying Locks and Dams Nos. 6 and 8 to
raise their pool levels, which with dredging will obviate the neces-
sity for constructing Locks and Dams Nos. 7 and 9.
730    REPORT OF CHIEF' OF ENGINEERS,      U.   S.   ARMY, 193 4


    The act of March 3, 1871, provided for open-channel work from
Arkadelphia to the mouth, and the act of July 5, 1884, provided for
the extension of such work in that portion of the stream known as
" Black River." The canalization work of the project is based on re-
port contained in House Document No. 448, Fifty-seventh Congress,
first session (Annual Report for 1902, p. 1435).
    The River and Harbor Act of March 2, 1919, provided for certain
changes in Locks and Dams Nos. 6 and 8 (Rivers and Harbors Com-
mittee Doc. No. 7, 65th Cong., 2d sess.). Lock and Dam No. 1
was eliminated from the plan by the Secretary of War under au-
thority given by the river and harbor act of March 2, 1907. The
open-channel work of the project is based on reports submitted in
House Executive Document No. 60, part 4, Forty-first Congress,
third session, and the Annual Report of 1883, page 1155. The latest
published map of the section of these rivers included in the project
is in the Annual Report for 1913, page 2336.
    Local cooperation.-None required. Local interests contributed
 $5,000 during the fiscal year 1929, which was expended in connection
with United States funds in prevention of cut-off near Camden, Ark.
    Terminal facilities.-At Monroe, La., there is 1 municipal ware-
house, 1 private electric crane, and 1 private warehouse. At
West Monroe there are three private warehouses with conveyors.
At Calion, Ark., there is one private warehouse with conveyor. At
Camden, Ark., there are three private warehouses. These existing
facilities are considered adequate for the present commerce.
    Operations and results during fiscal year.-During periods from
July 21, 1933, to June 22, 1934, the U. S. dredge Todd removed
995,840 cubic yards of material from the channel at Island Bayou,
Upper Glade, Plouden Bayou, Montgomery Landing, Harriman
Landing, Jonesville, Harrisonburg, Harrisonburg Bridge, upper ap-
proach to Lock 2, Minden Hall Landing, Smithland Bar, Breston,
lower- approach to Lock 3, Place Lake, Loch Lomond, Youngs
Shoals, lower approach to Lock 5, Jacks Island; approaches ,to
Lock 8, Eldorado Landing, Blue Beach, Cape Horn, Little Buffalo,
Pedren, Upper Pedren East Two Bayou, Hodges Shoals, Sulphur
Springs, Treadway, Buzzard Roost, and Camden Cut.

                  -removed
    During periods from September 5, 1933, to June 7, 1934, the U. S.
dredge Waterway              475,551 cubic yards of material from the
channel at upper approach to Lock 2, Bayou Louis, I. N. Davis
Landing, W. H. Hough Landing, Thompson's Bayou, Columbia,
Jacks Landing, Minden Hall Landing, Bayou Duchesne, Missouri-
Pacific Railroad bridge, Faust Bar, Rose Lawn Landing, lower
approach to Lock 4, Spoon Camp, Cold Bite Shoals, Frenchport
Shoals, and West Two Bayou.
    From October 22 to November 27, 1933, U. S. quarterboat No. 5
removed 5,097 obstructions from the channel between the mouth of
Black River and Lock and Dam No. 6, a distance of 238.7 miles.
    From May 7 to June 30, 1934 ,U. S. quarterboat No. 3001 removed
6,166 obstructions from the channel between Camden, Ark., and
Burnham Landing, a distance of 36.5 miles.
    This work is' classed as maintenance and was all done by hired
labor.
            RIVERS AND HARBORS-VICKSBURG,                        MISS.,     DISTRICT            731
Cost of dredging---------------------------------------$205,                                  811. 74
Cost of chopping---- --------------------------------------                                9, 539. 29
Cost of channel surveys and gage observations --            ____________                   1, 229. 43

      Total cost of maintenance-__-__  -________-____                                    216, 580. 46
Total expended-----------------------------------------                                  137, 618. 01
   Condition at end of 7fscal year.--The six locks and dams embraced
in the existing project for slack-water improvement of the Ouachita
River were completed in 1924 and provide navigation to Camden,
Ark. (See table under existing project,. p. 729.) The head of
navigation is Arkadelphia, Ark., to which point boats may occasion-
ally run during high water if snags, overhanging trees, or other
similar obstructions do not interfere. From January to June the
gage at Monroe, La., generally reads 10 feet or more, caused by the
river above, and minimum depths exceeding 7 feet are usual between
the mouth of Black River and Camden, Ark., a distance of 350.8
miles. At intervals during this period the reading of the Camden
gage exceeds 15 feet, and minimum depths of 7 feet may be expected
between Camden and Arkadelphia. During the remainder of the
year the pools furnished by Dams Nos. 2, 3, 4, 5, 6, and 8, with mod-
erate dredging in Black and Ouachita Rivers, provide depths of 6.5
feet between the mouth of Black River and Camden, Ark. The
controlling depth at the end of the fiscal year was 8.5 feet to Lock
and Dam No. 2 and 6.5 feet from there to Camden, Ark.
Cost of new work_-
                 ...                     ________------------                     $4, 574, 551. 31
Cost of maintenance---------                --------------------------             1, 350, 127. 05

      Total cost----------------------------------                                  5, 924, 678. 36
Total expended-_               ---------------------                                6, 197, 664. 39
Proposed operations.--The balance unexpended will be applied to
maintenance, using Government plant and hired labor, as follows:
Accounts payable June 30, 1934 ____.--.-.-_--.
                                             ------               $37, 155. 97
Maintenance:
    Dredging with U. S. pipe-line dredge Todd, 3
     months (July, August, September)              ------------
                                                     $56, 000.00
    Dredging with U. S. pipe-line dredge Waterway, 2
      months (July and August)--------- ----------    38, 000. 00
    Snagging with U. S. snagboat Jos. E. Randell, 2
     months (September and October) ------------      17, 00. 00
    Chopping with U. S. quarterboat No. 10, 2 months
      (July and August) -----------------------        7, 672. 18
                                                                  118, 672. 18

          Total for all work        ---------------------------------                    155, 828.15
   The additional sum of $120,000 can be profitably expended during
the fiscal year 1936, using Government plant and hired labor, as
follows :
Maintenance:
   Dredging with U. S. pipe-line dredges Todd and Waterway, 61/2
      months (both dredges during July and August, and dredge Todd
      alone during September and October and first half of November)_ $103, 000
   Snagging with U. S. snagboat Jos. E. Ransdell, 1 month (July)         9, 000
   Chopping with U. S. quarterboat No. 10, 2 nonths (July and
     August) _-     ----------------------------------------------       8, 000

          Total-                                       ___ ___---------------------_ _      120, 000
732           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

                                              Cost and financial summary

Cost of new work to June 30, 1934-----------------------    $5, 2:48, 618. 94
Cost of maintenance to June 30, 1934----------------------- 1, 350, 127. 05
      Total cost of permanent work to June 30, 1934                                         ----------             6, 598, 745. 99
Value of plant, materials, etc., on hand June 30, 1934-----------                                                     286, 310. 90
      Net total cost to June 30, 19346____-___-___                                                  -
                                                                                                 ___-              6, 885, 056. 89
Plus accounts receivable June 30, 1934_.... _____-- -                                                    ____          23, 831. 10
     Gross total costs to June 30, 1934---------------------                                                       6, 908, 887. 99
Minus accounts payable June 30, 1934 __________________ __                                                               37, 155. 97

     Net total expenditures---   -------------------------                                                         6, 871, 732. 02
Unexpended balance June 30, 1934___   _______________________                                                         155, 828. 15
           Total amounted appropriated to June 30, 1934-                                                              027, 560. 17
                                                                                                                   7----------,

           Fiscal year ending June 30                         1930            1931              1932            1933         1934


Cost of new work ..---------------------                    $6, 619. 57
Cost of maintenance        -       ..-------------------    95, 172. 14    $62, 167. 44 $139, 702. 43 $154, 926. 75       $216, 580. 46
        Total cost-...............
                                 ..-----. 101, 791. 71                      62, 167. 44   139, 702. 43    154, 926. 75     216, 580. 46
Total expended----------------------                       94, 972. 78      62, 442. 29   404, 316. 39    155, 895.88      137, 618. 01

Allotted....................---------------------------    127, 000. 00    445, 200. 00- ........ 228, 061. 51             171, 640. 17


Balance unexpended July 1, 1933-----------------------------      $121, 805. 99
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934---------------------   $100, 000. 00
Amount allotted from War Department Appropriation
  Act approved July 14, 1932 --- ------       __- _   78, 000. 00
                                                                   178, 000. 00

     Amount to be accounted for__ ____-_,____-   -       -                                                             299, 805. 99
Deductions on account of revocation of allotment____-__-
                                                     -                                                                   6,359. 83
      Net amount to be accounted for -----------------------                                                           293, 446. 16
Gross amount expended-       ___             --
                                      __-____-- ____ 268, 421. 62
Less reimbursements collected_------------           130, 803. 61
                                                                                                                       137, 618. 01

      Balance unexpended June 30, 1934____-----------,_--                                                              155, 828. 15
Outstanding liabilities June 30, 1934 _..............  9, 454. 84
Amount covered by uncompleted contracts----------      3,840. 00
                                                                                                   -                     13, 294.84

     Balance available June 30, 1934                                                                                        533. 31
                                                                                                                      1-----------------------42,
Accounts receivable June 30, 1934---                                      -- ________       -          ____-        -23, 831. 10
Unobligated balance available June 30, 1934                                                                            166, 364. 41
                                                                                                                        1________________
Amount that can be profitably expended in fiscal year ending June
                              - - -  - ,              _-
30, 1936, for maintenance 1_ __          ______          __
                                                         ___  __ _                                                     120, 000. 00

4. OPERATING AND CARE OF LOCKS AND DAMS, OUACHITA RIVER,
                      ARK. AND LA.

  The improvement for which report is made under this caption
forms part of the project for improving Ouachita and Black Rivers,
Ark. and La. (See pp. 728 to 732, where general information may be

    'Exclusive of available funds.
                 RIVERS AND                         HARBORS--VICKSBURG,                         MISS.,              DISTRICT                 733

found.) The completed locks and dams have been operated and
maintained under the permanent indefinite appropriation for the
following periods: No. 2, since November 1, 1918; no. 3, since Jan-
uary 1, 1919; no. 4, since January 1, 1915; no. 5, since October 14,
1924; no. 6, from January 25, 1913, to June 30, 1919, and since
January 1, 1923; no. 8, from October 1, 1912, to August 31, 1923, and
since November 16, 1924.
    Operations and results during fiscal year.-The improvement was
operated and maintained in a satisfactory condition throughout the
year.
Cost of operating and care_-------  -------------------       $63, 124. 18
Cost of improvement and reconstruction----------------------- 98, 114. 78

      Total cost-------                                   ------------------------------                                         161, 238. 96
Total expended -- _________                               _____________-            ----                                         161, 579. 39
   Condition at end                             of
                        fiscal year.-The existing project was com-
pleted :in 1924. The locks and dams are in good condition. The
dams are raised when needed, ordinarily between July and December,
and furnish continuous pools which, supplemented by moderate
dredging, provide a navigable depth of 6.5 feet from the mouth of
Black River to Camden, Ark. When river stages are high, usually
between January and June, the dams are not operated. The con-
trolling depth at the end of the fiscal year was 8.5 feet to Lock and
Dam No. 2 and 6.5 feet from there to Camden.
Cost of operating and care to June 30, 1934------------------ $1, 121, 771. 28
Cost of improvement and reconstruction              ---------- 1--------
                                                                , 600, 055. 22
      Total cost ------                                   -------------------------                                          2, 721, 826. 50
Total expended__________-_                                                                                                        729, 726. 24
                                                                                                                             2,2-------
  Proposed operations.-The locks and dams will be operated and
maintained under allotments from appropriations made available for
such purposes.
                                                    Cost an     financial summary
Cost of maintenance to June 30, 1934-------------------------                                                              $2, 72:1, 826.50
Value of plant, materials, etc., on hand June 30, 1934----------                                                                27, 105. 40
      Net total cost to June 30, 1934__----------------------_                                                               2, 748, 931. 90
Plus accounts receivable June 30, 1934-----------                                                                                 3, 772. 26
                                                                                                                                 1------------

      Gross total costs to June 30, 1934--------------------- 2, 762,704. 16
Minus accounts payable June 30, 1934------------------------      32, 977. 92

     Net total expenditures   ----------------------------- 2, 729, 726. 24
Unexpended balance June 30, 1934------------------ ---------    48, 704. 36

           Total amount appropriated to June 30, 1934 -                                            ....-.....                2, 778, 430. 60:

           Fiscal year ending June 30                            1930               1931            1932                  1933             1934

Cost of new work -..................                      I.         .       .             ..                   .     .          .     .
Cost of maintenance --          --       --------
                                            ...           $153, 884. 98 $243, 741. 73 $225,193. 87 $194, 831. 66                     $161, 238. 96

Total expended_           -----------------------             162, 300. 88       242, 639. 24   173, 496. 73         226, 311. 69    161, 579. 39
Allotted.......--------------------------                     200, 000. 00       225 000. 00    2250, 000. 00        173, 007. 54     128, 985. 59
734     REPORT    OF CHIEF     OF ENGINEERS,    U.    S.   ARMY,      1934

Balance unexpended July 1, 1933___-_-_--                 ___-__ _ $81, 298. 16
Amount allotted from permanent indefinite appropriation, sec. 6,
River and Harbor Act, Mar. 3, 1909 --___---____--_-----          137, 700. 00

     Amount to be acounted for___________________________ 218, 998. 16
Deductions on account of revocation of allotment----_           714. 41
                                                             8---------
                                                            8,

       Net amount to be accounted for__------                              210, 283. 75
Gross amount expended__ _--__---___-      ____-----        $266, 614. 22
Less reimbursements collected ___________________           105, 034. 83
                                                                           161, 579. 39

      Balance unexpended June 30, 1934 ______-. __...         ___-_ 48, 704. 36
Outstanding liabilities June 30, 1934_.___________ -         12, 019. 32
Amount covered by uncompleted contracts                          178. 79
                                                              9-------------,
                                                                              21, 198. 11

     Balance available June 30, 1934__-------         ---
                                                 __-------                  27, 506. 25
Accounts receivable June 30, 1934---------        __-------------           13, 772. 26

    Unobligated balance available June 30, 1934__    ___---__  41, 278. 51
Amount allotted for fiscal year 1935------------------------- 169, 000. 00

      Balance available for fiscal year 1935__________
                                              -___210,                          278. 51

               5. TENSAS RIVER AND BAYOU MACON, LA.

   Location.--Tensas River has its source in Lake Providence, East
Carroll Parish, La., flows about 166 miles in a general southerly di-
rection and joins Ouachita and Little Rivers at Jonesville, La.,
in forming Black River. Bayou Macon rises in Desha County, Ark.,
flows about 250 miles in a general southerly direction and enters
Tensas River, 42.7 miles above the mouth. (See Mississippi River
Commission map, "Alluvial Valley of the Mississippi River.")
   Previous projects.-The original project was adopted by the River
and Harbor Act approved March 3, 1881. The cost and expenditures
prior to adoption of existing project July 5, 1884, were $3,000 for
new work. (For further details see p. 1871 of Annual Report for
1915.)
   Existing project.-This provides for the removal of snags, sunken
logs, and overhanging timber on Tensas River from Tendal (for-
inerly Dallas), La., to the mouth, 137.8 miles, and on Bayou Macon
from Floyd, La., to the mouth, 111.6 miles, and for dredging the
bars between Chamberlain Bar and Kirk Ferry, in the Tensas River,
10 miles and 38 miles, respectively, above the mouth to a depth of
4 feet and width of 60 feet.
   At medium and high stages the channel under improvement in
these streams has an average width of about 150 feet, with minimum
depth of about 8 feet. Floods ordinarily cause fluctuations of stage
of about 45 feet between high and low water. Extreme floods occa-
sionally increase the range about 10 feet.
   The estimate of cost for new work, revised in 1922, exclusive of
amount expended on previous project is $48,395, of which $4,200 is
to be contributed by local interests. The latest (1933) approved
estimate for annual cost of maintenance is $2,500.
   The existing project was adopted by the following river and har-
bor acts: The act of July 5, 1884, provided for removal of snags, etc.
 (HI. Ex. Doc. No. 38, 46th Cong., 3d sess.), and the act of September
22, 1922, provided for dredging the channel in Tensas River (H. Doc.
           RIVERS AND HARBORS---VICKSBURG,                                     MISS.,   DISTRICT        735
No. 95, 67th Cong., 1st sess.). A map of both streams is published
in the Annual Report for 1913, page 2336.
   Local cooperation.--The River and Harbor Act of September 22,
1922, required that local interests contribute $4,200 to be used for
dredging bars between Chamberlain and Kirk Ferry. Local interests
have made no progress in complying with this requirement, and do
i)ot appear to be interested.
   Terminal f acilities.-None.
   Operations and results during fiscal year.-From April 2 to April
30, 1934, the U. S. quarterboat No. 5 removed 975 leaning trees from
the banks of Tensas River between Tendal, La., and Clayton, La.,
a distance of 110.6 miles.
   This work is classed as maintenance and was done by hired labor
using Government-owned plant.
Cost of ma ntenance ----------------------------                                                   $2, 194. 21
Total expended ___        __-----------------------                                                 2, 194. 32
   Condition at end of #seal year.-The existing project is about 75
percent completed. Tendal, La., on Tensas River, and Floyd, La.,
on Bayou Macon, are the heads of navigation, but due to the non-
completion of the project above Westwood Place on Tensas River,
navigation above this point is limited to small craft and rafted tim-
ber. However, recent bank clearing has made such navigation less
difficult.
   In ordinary seasons a depth of 6 feet or more may usually be ex-
pected from January to June on these streams. During the re-
mainder of the year the depth is usually reduced to about 1 foot. A
gage reading of 3.5 feet or more at Delhi, La., is favorable for light-
draft navigation, and 6.5 feet or more for heavy-draft navigation
on Bayou Macon. A gage reading of 20 feet or more at Clayton,
La., is favorable for light-draft navigation and 23 feet or more is
favorable for heavy-draft navigation on Tensas River. The con-
trolling depths at the end of the fiscal year were 2.6 feet on Tensas
River and 1.3 feet on Bayou Macon. The work remaining to com-
plete the project consists in removing the remaining obstructions
from Tensas River between Westwood Place and Tendal (formerly
Dallas), and dredging in that river between Chamberlain and Kirk
Ferry, authorized by the River and Harbor Act approved September
22, 1922.
Cost of new work---------------------------------                                         ----   $35, 366. 57
Cost of maintenance__  _________                                                                   3, 362. 91

      Total cost--                  --------------------------------                               8, 729. 48
                                                                                                 11---
Total expended---              ----------------------------------                                118, 723.43
  Proposed operations.-The balance unexpended will be applied to
maintenance between Delhi, La., and mouth of Bayou Macon and be-
tween Tendal, La., and mouth of Tensas River, using Government
plant and hired labor as follows:
Accounts payable June 30, 1934                                      $6. 05
Maintenance: Bank clearing and removing obstructions with U. S.
  quarterboat No. 5, one-half month (January)------------------ 2, 500. 00

         Total for all work___                                                                       2, 506. 05
Balance remaining -                   -   -                  -----------                   ---         246. 87

                     ..
         Total .. __________-..                          .         .       .                         2- 752.92
        91536-ENG 1934----47
736          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

  The additional sum of $2,500 can be profitably expended during
the fiscal year 1936, using Government plant and hired labor, to be
applied to bank clearing and, removing obstructions from Delhi, La.,
to mouth of Bayou Macon, La., and Tendal, La., to mouth of Tensas
River, during December 1935.
                                        Cost and financial summary

Cost of new work to June 30, 1934------------------------- $38, 366. 57
Cost of maintenance to June 30, 1934------------------------83, 362. 91

      Total cost of permanent work to June 30, 1934------------121, 729. 48
Minus accounts payable June 30, 1934---------------------------       6. 05

     Net total expenditures-__                                       723. 43
                                                               1-----------------121,
Unexpended balance June 30, 1934----------------------------2,       752. 92

         Total amount appropriated to June 30, 1934                                        ------------ 124, 476. 35

         Fiscal year ending June 30                             1930          1931           1932          1933            1934


Cost of new work                         -------          -         -              ---
                                                                                  ----
                                                                            .----------- ---             $2, 504.13    .--------
Cost of maintenance ----------------                     --                 $1,469. 93       $177. 75     1, 883. 46      $2, 194. 21

      Total cost ..---------        ---------                                1, 469.93         177.75     4, 387. 50       2,194. 21

Total expended -------------                                                11, 566. 43   -2, 147. 79   -3, 389. 53        2, 194. 32

Allotted-...................---------           ------        $5, 576. 35    5, 000. 00    7, 770. 96 -15, 229. 70         2, 358. 74


Balance unexpended July 1, 1933                                $2, 588. 50
Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934--    ---------------------------------------     2, 500. 00

     Amount to be accounted for___----------------------------5, 088. 50
Deductions on account of revocation of allotment----------------- 141. 26

      Net amount to be accounted for--------------------- _                                                            4, 947. 24
Gross amount expended__ ___--_______-_________ $2, 241. 27
Less reimbursements collected--------------------------   46. 95
                                                                                                                       2, 194. 32
      Balance unexpended June 30, 1934-----------------------                                                           2, 752. 92
Outstanding liabilities June 30, 1934_-11111111111111111111111                                                         1     4. 50

         Balance available June 30, 1934----------------------                                                         2:, 748. 42

Amount that can be profitably expended in fiscal year ending June
                                                                                                            -
   30, 1936, for maintenance 1----                                                                                     2, 500. 00

                                           6. BOEUF RIVER, LA.

   Location.-This river rises in Desha County, Ark., flows about 240
miles in a general southerly direction, and enters Ouachita River at
Sicily Island Gorge.      (See Mississippi River Commission Map
"Alluvial Valley of the Mississippi River.")
  Existing project.-This provides for the removal of snags, logs,
and overhanging trees between Wallace Landing and the mouth, a
distance of 166 miles. The project was afterward modified to in-
clude the closure of three outlets near Point Jefferson.
  1Exclusive of available funds.
             RIVERS AND HARBORS-VICKSBURG,              MISS.,    DISTRICT       737
   At medium and high stages the channel has an average width of
about 200 feet with minimum depth of about 8 feet. Floods ordi-
narily cause fluctuations of stages of about 30 feet between high and
low water. Extreme floods occasionally increase this range about 10
feet.
   The estimate of cost for new work for removing snags, etc., made
in 1880, is $20,020. The estimate of cost for new work for closing
the outlets, revised in 1928, is $15,000. The latest (1933) approved
estimate for annual cost of maintenance is $2,500.
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1881, provided for the removal of
snags, etc. (H. Ex. Doc. No. 38, 46th Cong., 3d sess.), and the acts
of August 5, 1886, and August 11, 1888, provided for closing the
outlets (H. Ex. Doc. No. 99, 48th Cong., 2d sess.). (For latest pub-
lished map see Annual Report for 1913, p. 2336.)
   Recomnmended modifications of project.-It is recommended that
this project be modified by the elimination of all work above Girard,
La. (The abandonment of the entire project was erroneously recom-
mended in H. Doc. No. 467, 69th Cong., 1st sess.)
   Terminal facilities.-None.
   Operations and results during fscal year.-None. The expendi-
tures were $3.71, applied to liabilities incurred during the preceding
fiscal' year.
   Condition at end of fiscal year.-The existing project is about 67
percent completed. The head of navigation is Wallace Landing.
The removal of snags was completed in 1896 as far upstream as Point
Jefferson, 150.8 miles above the mouth. Navigation above this point
is limited to small craft and rafted timber. The outlets were closed
in 1887-88, but the dams were washed away in 1890. The outlets
deplete the channel and make navigation more difficult. The work
remaining to complete the project consists in reclosing the above-
mentioned outlets and the removal of obstructions from Point Jef-
ferson to Wallace Landing, a distance of about 15 miles. In ordi-
nary seasons a depth of 6 feet or more may usually be expected
between January and June from the mouth to Point Jefferson.
During the remainder of the year the depth is usually reduced to
1 foot. A gage reading at Girard, La., of 3.5 feet or more is favor-
able to light-draft navigation, and 6.5 feet or more is favorable to
heavy-draft navigation. The controlling depth at the end of the
fiscal year was 1.5 feet.
Cost of new work ------------------                                       $30, 000. 00
Cost of maintenance------                                                 101, 236. 88

      Total cost--------------------------------                          131, 236. 88
Total expended                 --------                                   131,.236. 88
  Proposed operations.-The balance unexpended will be applied to
maintenance between Girard, La., and the mouth, using Government
plant and hired labor, as follows:
Bank clearing and removing obstructions, with U. S. quarterboat
No. 5, one-half month (February)                               $2, 500. 00
Total for all work--------------------------------------                     2, 500. 01)
Balance remaining ---------------------------------------------              2, 351. 49
        Total         -------                                -        -      4, 851. 49
738           REPORT      OF    CHIEF OF ENGINEERS, U.                    S. ARMY,              1934

   The additional sum of $2,500 can be profitably expended during the
fiscal year 1936, using Government plant and hired labor to be ap-
plied to bank clearing and removing obstructions between Girard,
La., and the mouth during December 1935.
                                   Cost and financial summary

Cost cof new work to June 30, 1934_ ------------------------                                            $30, 000. 0)
Cost of maintenance to June 30, 1934               -------                                            101, 236, 88

           Total cost of permanent work to June 30, 1934_-                           ---              131, 236. 88

Net tcotal expenditures        --                                                                       131, 236. 88
Unexi pended balance June 30, 1934_...                                                                    4, 851. 49
           Total amount appropriated to June 30. 1934_-                                    -                 088. 37
                                                                                                        13.3(6,
                               __ _                    _
           Fiscal year ending June 30           1930         1931          1932                1933          1934
                                          Cot
                                          fne
                                          or
Cost of new work ......-
Cost of maintenance ____                                   $2, 648. 51
                                                                         ....---.----
                                                                           $356. 97 $138. 53                 -    -
Total expended ..........                                   2, 555. 17      448.31              134. 82          $3. 71
Allotted    .-..-        .
                        -..                 -$576. 35       3,000.00         ---
                                                                            -- --               -4.01        2, 499.51


Balance unexpended July 1, 1933-------------------------------- $2, 355. 69
Amount allotted from War Department Appropriation Act approved
      Apr. 26, 1934--------------------------------------------  2,500. 00
Amount to be accounted for--___                                                                           4, 855. 69
Deductions on account of revocation of allotment.....                                                            0. 49
Net amount to be accounted for___________________________________                                         4, 855. 20
Gross amount expended----------------                                                                          3. 71
Balance unexpended June 30, 1934--------------------------------4, 851. 49

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1-----------------------                                                       2, 500. 00

                       7. BAYOUS D'ARBONNE AND CORNEY, LA.

   Location.-Bayou D'Arbonne is formed by the junction of three
tributaries near Farmerville, La. These streams rise in Claiborne
Parish, La.
   Bayou Corney flows about 76 miles; the middle fork flows about
55 miles, both in a southeasterly direction; and Little D'Arbonne
flows about 56 miles in an easterly direction. Below the junction
Bayou D'Arbonne flows 37.7 miles in a southeasterly direction and
enters Ouachita River, 189 miles above the mouth of Black River.
 (See Mississippi River Commission map "Alluvial Valley of the
Mississippi River.")
   Existing project.-This provides for the improvement of Bayous
D'Arbonne and Corney between the mouth of the former and Cobb
Landing on the latter, a distance of 57 miles, by removing snags,
logs, stumps, and leaning trees obstructing navigation.
   At medium and high stages the channel under improvement in
these streams has an average width of about 125 feet, with minimum
   'Exclusive       of available funds.
                  RIVERS AND HIARBORS-VICKSBURG,                                          MISS.,      DISTRICT            739
depth of about 8 feet. Floods ordinarily cause fluctuation of stage
of about 20 feet between high and low water. Extreme floods occa-
sionally increase this range about 10 feet.
   The latest approved estimate of cost for new work in Bayou
D'Arbonne, and about 3 miles up Bayou Corney, made in 1883, was
$15,000; and for the new work in Bayou Corney alone, made in 1887,
$8,000. The latest approved estimate of cost for maintenance in
both streams, made in 1933, is $2,500 a year until 1935, and bian-
nually thereafter.
   The existing project was authorized by the following river and
harbor acts: The act of July 5, 1884, provided for work in both
streams as far up as Stein Bluff (S. Ex. Doc. No. 69, 48th Cong., 1st
sess.); and the act of July 13, 1892, provided for extending work
up to Cobb Landing (same document and p. 1489, Annual Report
for 1887). A map of both streams is published in the Annual Report
for 1913, page 2336.
   Terminal facilities.-None.
   Operations and results during fiscal year.-None. The expendi-
tures were $5.56, for liabilities incurred during the preceding fiscal
year.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1896 at a saving of $4,000 under the estimated cost. Cobb
Landing, on Bayou Corney, is the head of navigation. In ordinary
seasons a depth of 7 feet or more may be expected from January to
June within the limits of the project. During the remainder of the
year the depth is reduced to about 1 foot. A gage reading of 3.5
feet or more at Farmerville, La., is favorable to light-draft naviga-
tion, and 6.5 feet or more is favorable to heavy-draft navigation.
The controlling depth at the end of the fiscal year was 1.6 feet.
Cost of new work--------------------------------------------                                                    $19, 000. 00
Cost of maintenance---    -------------------------------                                                        37, 803. 88
            Total cost---                      ----------------------------------                                   56, 803.88
Total expended--                                  - -------------------------
                                                          -                                                     56, 803. 88
  Proposed operations.-No operations are proposed during the fiscal
years 1935 and 1936.
                                                Cost and financial summary
Cost of new work to June 30, 1934 _____---___-------                                                            $19, 000. 00
Cost of maintenance to June 30, 1934         ------------------------                                            37, 803.88

      Total cost of permanent work to June 30, 1934_________                                               __ 56, 803. 88
Net total expenditures--..________-- _____-__-__--                                                          -56,  803..88

Unexpended balance June 30, 1934-------                                                                              2, 289.37

            Total amount appropriated to June 30, 1934_                                                    --       59, 093. 25

           Fiscal year ending June 30                              1930         1931        1932         1933           1934


Cost ofnew work...------------------- ---- ----------
                                              -       ----                                                                     ---
Cost of maintenance--------..........--------------............-----------      $307.19     $188.91      $207.78 -----------
Total expended------------------.---------                                   -- -391. 29      204. 81     202. 22         $5.50
Allotted.------------ -----------------                             $2,500        500.00 ------------     -6.00           -0.75
740     REPORT OF CHIEF OF ENGINEERS,           UT. S.   ARMY,    1934

Balance unexpended July 1, 1933___                                    $2, 295.68
Deductions on account of revocation of allotment__--              -   -
                                                                 -__-__-    0. 75
      Net amount to be accounted for__                                   2, 294. 93
Gross amount expended ______       ________________________                   5. 56
      Balance unexpended June 30, 1934___________________________        2, 289. 37

                         8. YAZOO RIVER, MISS.

   Location.-This river is formed by the junction of Tallahatchie
and Yalobusha Rivers, in Leflore County, Miss., flows about 189
miles in a southerly and southwesterly direction, and enters the
Mississippi River at Vicksburg, Miss. (See Mississippi River Com-
mission. map "Alluvial Valley of the Mississippi River.")
   Previous projects.-The original project was adopted by the River
and Harbor Act of March 3, 1873. Total cost and expenditures
under it prior to adoption of existing project, March 3, 1875, were
$39,023.06 for new work. For further details see page 1871 of
Annual Report for 1915.
   Existing project.-This provides for the removal of snags, wrecks,
sunken logs, overhanging trees, and other obstructions throughout
the entire length of the river, a distance of 189 miles.
   The channel under improvement has an average width of about
200 feet and a minimum depth of 4 feet at all stages during the entire
year. Floods ordinarily cause fluctuations of stage of about 35 feet
between high and low water. Extreme floods occasionally increase
this range about 5 feet.
   The latest approved estimate of cost for new work to be finished in
4 years , made in 1874, was $120,000, exclusive of amount expended
on previous project. The latest (1914) approved estimate for an-
nual cost of maintenance is $16,000.
   The existing project was adopted by the River and Harbor Act of
March 3, 1875 (p. 364 of Annual Report for 1874). A map .of the
stream is published in the Annual Report for 1913, page 2336.
  .:T.erminal facilities.-Data for terminal facilities is contained in
Transportation Series No. 2, 1929," Transportation in the Mississippi
and Ohio Valleys".
    Operations and results during fiscal year.-From September 7 to
September 12, 1933, the U. S. combined dredge and snagboat Sun-
flower removed 1,520 cubic yards of material from the channel at
agid'inear the mouth of O'Neals Creek..
   Durihg the period August 14 to October 15, 1933, the Snflower
and 'attendant quarterboat No.:,9 removed 8,121 obstructions from
the channel between the head of the stream and the head of Yazoo
Canal, a distance of 182 miles. From December 11, 1933, to January
6, 1934, the Sunflower and quarterboat No. 9 removed 2,708 obstruc-
tions: between mile 149 and Yazoo City, mile 75.
    On May 31 and June 25, 1934, slides were blasted from the channel
at Liverpool Landing, 57 miles above the. mouth.
    This work is classed as maintenance and was all done by hired
labor.
           RIVERS AND HARBORS---VICKSBURG,                      MISS., DISTRICT           741

Cost of dredging _      _----------------            --                   --       $1, 240. 07
Cost of snagging and chopping           -------                                     8,553. 78
Cost of channel surveys and observations-                 --     ------             1. 213. 48

      Total cost of maintenance         -_ _ _11,                                      007. 33
Total expended---         ------------------------
                                              _-_                                  10, 991. 86
   Condition at end of fiscal year.-The existing project was colm-
pleted in 1888. The river is navigable throughout its length. In
ordinary seasons the gage at Yazoo City usually reads 6 feet or more
between January and June and depths exceeding 10 feet may be
expected from the mouth to the head of the river. During the
remainder of the year this gage frequently registers below zero, and
depths of 4 feet or more are usually found. The controlling depth
at the end of the fiscal year was 4 feet.
Cost of new work-------------------------------------------$320, 637. 64
Cost of maintenance--                                         361, 873. 59
      Total cost                     -------------------------82, 511. 23
                                                             6-----------
Total expended---------------------------------     ------    82, 443. 11
  Proposed operations.-The balance unexpended will be applied to
maintenance of channel between the mouth and Greenwood, Miss.,
using Government plant and hired labor as follows:
Accounts payable June 30, 1934----------------------------------    $1, 107. 32
Maintenance:
    Dredging with U. S. combined dredge and snagboat Sun-
      flower, one-half month (September) ------------------ $2, 500
    Snagging and chopping with U. S. combined dredge and
      snagboat Sunflower and U. S. quarterboat No. 9 1%4
      months (July and August) --                         -  8, 000
                                                                    10, 500. 00

       Total for all work ------------                                             11, 607. 32
     Balance remaining -----------------------------------------                    5, 726. 22
       Total--- ------------------------------------                               17, 333.54
   The additional sum of $12,000 can be profitably expended d urin
the fiscal year 1936 using Government plant and hired labor, as
follows:
Maintenance :
   Dredging channel between mouth and Greenwood, Miss., with U. S.
      combined dredge and snagboat Sunflower, one-half month (Sep-
      tember)           ------            ____________                $3, 000
   Snagging and chopping between mouth and Greenwood, Miss., with
      U. S. combined dredge and snagboat Sunflower and U. S. quarter-
      boat No. 9, 2 months (July and August)------------------------ 9,000

                             Cost and financial summary                               12,.000
Cost of new work to June 30, 1934-----------------------_                       $359; 660. 70
Cost of maintenance to June 30, 1934__-      -                                   361, 873.. 59
       Total cost of permanent work to June 30, 1934 ---------                   721, 534.29
Value of plant, materials, etc.. on hand June 30, 1934_                    __       1, 039. 20
      Net total cost to June 30, 1934--------------------------                  722, 573. 49
Minus accounts payable June 30, 1934_                                              1, 107. 32
     Net total expenditures--------___                                           721, 466. 17
Unexpended balance June 30, 1934------_                        -------            17, 333. 54
       Total amount appropriated to June 30, 1934--                              738. 799. 71
742        REPORT                    OF CHIEF                       OF ENGINEERS,                       U.       S.       ARMY,       1934


        Fiscal year ending June 30                                          1930             1931                  1932              1933               1934

Cost of new work -           -            -        -       -          -      -     -     -          -        -        -        --           -      -       -
Cost of maintenance                                                       $6, 176.52    $13, 086.16          $22,171.05        $1, 900. 00         $11, 007. 33
Total expended                                                             6, 330. 15    12, 973. 65             22, 396. 16        1, 581. 12         10, 991.86
Allotted -- --   -   -   -       -    -       -    -   -       --          3, 293.80     20, 000.00               6, 000.00     15, 968. 24            10, 344.44


Balance unexpended July 1, 1933-                 -------------------------- $17, 980. 96
Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934     -----------------------------------                       10, 500. 00

     Amount to be accounted for______________________       ____   28, 480. 96
Deductions on account of revocation of allotment------------------     155. 56
       Net amount to be accounted fo,r------------------------                                                                                   28, 325. 40
Gross amount expended -------------------------         $11, 883.12
Less reimbursements collected_-      -__ --------------      891. 26
                                                                                                                                                 10, 991. 86
      Balance unexpended June 30, 1934      ----------------------                                                                               17, 333. 54
Outstanding liabilities June 30, 1934-----------------------------                                                                                    22. 95
         Balance available June 30, 1934------------------------                                                                                 17, 310. 59
Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1   __________________________                                                                                        12, 000. 00

                                                  9. YALOBUSHA                         RIVER, MISS.

    Location.-The Yalobusha River rises in Chickasaw County, Miss.,
and flows about 165 miles westerly across north central Mississippi
to a junction with Tallahatchie River, 3 miles above Greenwood.
Miss. (See Mississippi River Commission map "Alluvial Valley of
the Mississippi River.")
    Existing project.-This provides for the removal of leaning timber,
drift, and the most dangerous snags, between Grenada, Miss., and the
mouth, 63 miles.
    At medium and high stages the channel under improvement was
125 to 225 feet wide with depths suitable for 3-foot navigation. The
Yalobusha River is subject to violent fluctuations in stage and to in-
termittent and frequent periods of low flow. Floods ordinarily
cause fluctuations in stage of about 25 feet between high and low
water.
    The estimate of cost for new work made in 1881, was $7,000. No
approved estimate for annual maintenance has been made.
    The existing project was authorized by the River and Harbor Act
of March 3, 1881 (S. Ex. Doc. No. 35, 46th Cong., 2d sess., and p. 1414
of Annual Report for 1881). No map of the stream has been pub-
lished.
    Recommended modifications of project.-The project is recom-
mended for abandonment. (H. Doc. No. 467, 69th Cong., 1st sess.)
    Terminal facilities.-None.
    Operations and results during fiscal year.--At various times be-
tween April 1 and June 30, 1934, drift was removed from the
    1Exclusive       of available funds.
              RIVERS AND HARBORS-VICKSBURG,                                    MISS., DISTRICT                   743
channel at the mouth of Potacocowa Creek, 13.5 miles above the
mouth, as an aid to the current in cutting a deeper channel at this
point.
  This work is classed as maintenance and was done by hired labor.
Cost of maintenance                                                                                         $795. 22
Total expended      ------------------------                                                                 795. 22
   Condition at end of fiscal year.--The existing project was com-
pleted in 1884. Granada, Miss., 62.9 miles above the mouth, is the
head of navigation. In ordinary seasons from January to June
the gage at Granada may be expected to read 5 feet or more, and
depths exceeding 3 feet are generally found between the mouth
and head of navigation. During the remainder of the year the
stage often falls to about 2.5 feet and minimum depths of less than
1 foot are frequent. The controlling depth at the end of the fiscal
year was 1.3 feet.
Cost of new work              ----------------------------------------                                     7, 000. 00
Cost of maintenance                                  -                                                    12, 954. 57

       Total cost--------------------------------------                                                   19, 954. 57
Total expended__-------------------------                                                                 19, 954.57
    Proposed operations.-No operations                                     are proposed during the
fiscal years 1935 and 1936.

                                  Cost and financial summary

Cost of new work to June 30, 1934--------------_                                                   -      $7, 000. 00
Cost of maintenance to June 30, 1934                                                                          954. 57
                                                                                                          1------------------------2,

          Total cost of permanent work to June 30, 1934                                                       954. 57
                                                                                                          1-------------9,

Net total expenditures -            --------------           19, 954. 57
                                                             1-----
Unexpended balance June 30, 1934---------------------------- 2, 981. 81
         Total amount appropriated to June 30, 1934_--------------                                        22, 936. 38

         Fiscal year ending June 30             1930                1931           1932        1933            1934


Cost of new work
Cost of maintenance _    _-             -_ --                   _          ---___---$8,         159.35         $795. 22
Total expended-----                      -----------------------------------              -   8, 159.35          795. 22
Allotted-------------- - ----------------                                                     9,000 00         2,936.38
Balance unexpended July 1, 1933 ---------                        $840. 65
Amount allotted from War Department Appropriation Act approved
  July 14, 1932    ------------------------------------------  3, 000. 00
      Amount to be accounted for_                                                                          3, 840. 65
Deductions on account of revocation of allotment---------------                                                63. 62

       Net amount to be accounted for----------------             3, 777. 03
Gross amount expended--       -------------------------- $815. 81
Less reimbursements collected     ------------------------ 20. 59
                                                                     795. 22
         Balance unexpended June 30, 1934_._-                                                              2. 981. 81
744     REPORT OF      CHIEF OF ENGINEERS, U.         S. ARM1Y,    1934

                    10. BIG SUNFLOWER RIVER, MISS.

   Location.-This river has its source in Mud Lake, Coahoma
County, Miss., flows about 240 miles in a southerly direction, and
enters Yazoo River about 44 miles above its mouth. (See Mississippi
River Commission map "Alluvial Valley of the Mississippi River.")
   Previous projects.-The original project was authorized March 3,
1879. The cost and expenditures under this project prior to adop-
tion of existing project, March 2, 1907, were $101,637.44, of which
$66,000 was for new work and $35,637.44 for maintenance.          (For
further details see page 1871 of Annual Report for 1915.)
   Existing project.-This provides for the improvement of the river
from the mouth to Baird, a distance of 96.1 miles, by the closure of
outlets, the construction of contraction works, and the removal
of snags, sunken logs, leaning trees, and other obstructions; and from
Baird to the mouth of the Hushpuckena, 75.3 miles, by the construc-
tion of a lock and dam at Little Callao Landing and open-channel
work, including dredging and construction work. The principal fea-
tures of the lock and dam are as follows:
  Number: i.
Location: Little Callao Landing, Miss.
From nearest town: 17 miles.
Above mouth of river : 62 miles.
  Lock: Width of lock chamber, 36 feet; greatest available length for full
width of lock, 160 feet; lift at low water, 16.9 feet; depth on miter sill at low
water, 5.11 feet; gates; wooden miter; character of foundation, piling in sand.
Kind of dam: Movable, Poiree, needle.
Type of construction: Concrete.
Percentage of completion: Officially finished 1918.
Actual cost: $402,288.40.
   The project proposes to obtain a channel at low water from the
mouth of Big Sunflower River to the mouth of the Hushpuckena, a
distance of 171.4 miles, with an average width of about 100 feet and
a least available depth of 41/2 feet.
  Floods ordinarily cause fluctuations of stage between high and low
water of about 30 feet. Unusual floods occasionally increase this
range about 5 feet.
   Exclusive of amount expended on previous project, the latest ap-
proved estimate of cost for new work for closing outlets, made in
1906, was $75,000; for constructing lock and dam, revised in 1914,
$500,000; and for open-channel work, revised in 1928, $186,700. The
latest (1933) approved estimate for annual cost of maintenance by
removing snags, etc., is $8,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 2, 1907, providing for closing outlets,
constructing contraction works, and removing obstructions from the
mouth to Baird (H. Doc. No. 667, 59th Cong., 1st sess.) ; and the act
of July 25, 1912, provided for construction of lock and dam and
open-channel work above Baird (Rivers and Harbors Committee
Doec. No. 2, 62d Cong., 2d sess.). A map of the stream is published
in the Annual Report for 1913, page 2336.
            RIVERS      AND HARBOIS-           VIC]SBURG,        MISS., DISTRICT        745
    Recommended modifications of project.-It is recommended that
this project be modified by the elimination of all work between
Pentecost and the mouth of the Hushpuckena River. (The abandon-
ment of the entire project was erroneously recommended in H. Doc.
No. 467, 69th Cong., 1st sess.).
    Terminal facilities.-None.
    Operations and results during fiscal year.-None. Cost of main-
tenance as applied to overhead, plant repairs, and plant improve-
ments was $5,640.63. Expenditures were $3,978.13.
    Condition at end of fiscal year.-The outlets were closed under the
existing project in 1909 and the contraction work was finished in
'1912. The single lock and dam contemplated was completed in
  1918, as stated in the table in the existing project, at a saving of
 $97,711.60. The open-channel work above the dam is about 20 per-
cent completed. The mouth of Hushpuckena River, mile 171.4, is
the head of navigation. However, due to the incompletion of the
project above Pentecost, mile 124.6, navigation above that point is
limited to small craft and rafted logs. A minimum depth of 5 feet
below Pentecost may be expected from January to June. During
the balance of the year the pool formed by the lock and dam in
connection with open-channel work now furnishes a depth of 4.5
feet up to Pentecost. In that part of the river below the dam a
gage reading of 69.5 feet or more at Holly Bluff, Miss., is favorable
to light-draft navigation and 72.5 feet or more is favorable to heavy-
draft navigation. The controlling depth at the end of the fiscal
year was 1 foot. The work remaining to be done to complete the
project consists of dredging the channel to a minimum depth of
4.5 feet from Pentecost to the mouth of Hushpuckena River and
depositing the soil along the banks to contract the width of the river,
and the completion of open-channel work above Baird, Miss.
Cost of new work-------------------------------------------_                  $494, 026. 65
Cost of maintenance_---------------                                            240, 589. 95
       Total cost                ---          ----------                       734, 616. 60
Total expended --------                                     ----
                                                    - __---------------   ---. 755, 087. 13
  Proposed operations.-The balance unexpended plus accounts re-
ceivable at the end of the year will be applied to maintenance of
channel between the mouth and Lock and Dam No. 1, using Govern-
ment plant and hired labor, as follows:
Accounts payable June 30, 1934________________________________ $2, 480. 62
Maintenance: Snagging and chopping with U. S. combined dredge
and snagboat Sunflower and U. S. quarterboat No. 9 during Novem-
ber 1934 ----------------------------------------------------    2, 99. 64
       Total for all work-------------------                                       5, 480. 26
   The additional sum of $5,000 can be profitably expended during
the fiscal year 1936, using Government plant and hired labor, in
snagging and chopping between the mouth and Lock and Dam No. 1
with U. S. combined dredge and snagboat Sunflower and U. S. quar-
terboat No. 9 during October 1935.
746          REPORT OF CHIEF OF ENGINEERS,                             U. S. ARMY, 1934

                                       Cost and financial summnary
Cost of new work to June 30, 1934__________________________                                            $560, 026. 65
Cost of maintenance to June 30, 1934_------------------__-----                                          276, 227. 39
      Total cost of permanent work to June 30, 1934_______ ___                                          836, 254. 04
Value of plant, materials, etc., on hand June 30, 1934_   -                                              21, 827. 07
      Net total cost to June 30, 1934         -----------                                               858, 081. 11
Plus accounts receivable June 30, 1934___ ____-           ___                                                1, 124. 08

      Gross total costs to June 30, 1934____                           _______________                  859, 205. 19
Minus accounts payable June 30, 1934_                                                                     2, 480. 62

     Net total expenditures       -------                                                               856, 724. 57.
Unexpended balance June 30, 1934_____________________________                                             5, 448. 34

         Total amount appropriated to June 30, 1934_                                                     62, 172. 91
                                                                                                        8______________

         Fiscal year ending June 30              1930          1931          1932               1933            1934


Cost of new work          ----------
Cost of maintenance ----------------           $2,645.86     $8, 176. 19     $179.46      $10, 724. 12         $5, 640. 63
Total expended _-_                              4, 948. 53    2,780.22     -3, 745. 78         9, 744. 19       3, 978.13

Allotted-     -     ... ----- ---             -3,172. 34      8, 200. 00   ---- -- --          5, 061. 55       2, 993.55


Balance unexpended July 1, 1933----------------------                                                       $6, 432. 92
Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934-----------   ---------------------------------                                                4, 000. 00
     Amount to be accounted for------------------------------10, 432. 92
Deductions on account of revocation of allotment                  006. 45
                                                               1------------------,

       Net amount to be accounted for                                                       __               9, 426. 47
Gross amount expended__                                           --                $37, 511.13
Less :
    Reimbursements collected                                        508. 00
                                                                 $---------------33,
    Receipts from sales      ,,                                      25. 00
                                                                            33, 533. 00
                                                                                                             3. 978. 13
Balance unexpended June 30, 1934 ----------------------                                        ___           5,448. 34
Outstanding liabilities June 30, 1934-------11.                        -            --          -  -           199. 80

         Balance available June 30, 1934-............                                                        5, 248. 54
Accounts receivable June 30, 1934---------------------_                                          __          1, 124. 08

         Unobligated balance available June 30, 1934----------------6, 372. 62

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1---_                                                                             5,000. 00

11. OPERATING AND                      CARE OF LOCK AND DAM,                             BIG      SUNFLOWER
                                           RIVER, MISS.

  The improvement for which report is made under this caption
forms part of the project for improving Big Sunflower River, Miss.
See pages 744 to 746 where general information may be found. The
completed lock and dam has been operated and maintained under
the permanent indefinite appropriation since May 1, 1918.
   Operations and results during fiscal year.-The lock and dam at
Little Callao Landing has been operated as required during the fiscal
    1Exclusive of available funds.
                RIVERS AND HARBORS-VICKSBURG,                                                  MISS., DISTRICT                          747
year, and plant, structures, and grounds have been maintained in
good condition. The cost was $1,993.83 and the total expenditure
was $2,003.24, all for operating and care.
   Condition at end of fiscal year.-The lock and dam is in good con-
dition. The dam is raised when needed during the low-water season,
which occurs ordinarily between July and December. It provides a
pool varying in depth from 22 feet to 1 foot for a distance of 61.8
miles upstream when the gage at the lock reads 22 feet. During
low water the pool extends the navigable portion of the river to
Pentecost, Miss., 124.6 miles above the mouth. When river stages
are high, usually between January and June, the lock and dam is not
operated. The controlling depth in the vicinity of the lock and
dam at the end of the fiscal year was 4.1 feet.
Cost of operating and care to June 30, 1934___                                                                               $94, 909. 19
Cost of improvement and reconstruction     ------                                                                             51, 330. 45
           Total cost ------------                                                                                           146, 239. 64
Total expended------                                       --                                                                146, 168. 26
  Proposed operations.-The lock and dam will be operated and
maintained under allotments from appropriations made available
for such purposes.
                                                Cost and financial summary
Cost of maintenance to June 30, 1934__                                                                                      $146, 239. 64
Minus accounts payable June 30, 1934-                                         -                -      --                           71. 38
     Net total expenditures___                                                                                               146, 168. 26
Unexpended balance June 30, 1934----------------------------                                                                   3, 931.84

           Total amount appropriated to June 30, 1934 --                                                   -                 150, 100. 10

           Fiscal year ending June 30                             1930             1931              1932            1933             1934

C ost of new work .. . .. . ..          . ...                   .. . .. .- -.. . .. .              - --..-                   -
Cost of maintenance- ...............                   -        $7, 473. 15 $5, 744. 10            $5, 426. 85     $5, 461. 50      $1, 993. 83
Total expended..       ..    .                                   7, 502. 88       5, 762. 36        5, 630. 85      5, 586. 08        2,003. 24
Allotted--      -   ___---------       ----        -             7,000. 00        7,000.00          7,000. 00       2, 658. 13        4, 536. 26


Balance unexpended July 1, 1933___----------                                                                                     $1, 398. 82
Amount allotted from permanent indefinite appropriation, sec. 6,
River and Harbor Act, Mar. 3, 1909--------                                                                                       5 600. 00

      Amount to be accounted for_                                                                                                 6, 998. 82
Deductions on account of revocation of allotment--------------                                                                    1, 063.74

      Net amount to be accounted for___                                                                                           5, 9:35. 08
Gross amount expended                                                                                          $2, 139. 30
Less reimbursements collected-----                                                                                 136. 06
                                                                                                                                  2, 003. 24

      Balance unexpended June 30, 1934_           --                                                                         3, 931. 84
Outstanding liabilities June 30, 1934--------------------                                                           74. 85
Amount covered by uncompleted contracts                                                                              6. 95---------------
                                                                                                                     6.95
                                                                                                                                  81. 80

     Balance available June 30, 1934.---------------                                                                              3, 850. 04
Amount allotted for fiscal year 1935__                                                                                               000. 00
                                                                                                                                  1-----------------,

           Balance available for fiscal year 1935_--                                                                                 850. 04
                                                                                                                                  4-----------,
748      REPORT OF     CHIEF OF ENGINEERS,             U.   S. ARMY,   1934

                 12. MOUTH OF THE YAZOO RIVER, MISS.

   Location.-See report for Yazoo River, page 740.
   Eisting project.-This provides for opening a new outlet for the
Yazoo River through the wrong end of Old River, across a neck of
lowland to Lake Centennial, around the head of De Soto Island,
and down the east arm of Lake Centennial to the Mississippi River
just below the city of Vicksburg. The total length of the proposed
canal is 9.3 miles, with least width of 98.5 feet, and bottom of canal
prism 6.5 feet below zero on the Vicksburg gage.
   The ordinary fluctuation between high and low water is about 44
feet. Extreme floods occasionally increase this range about 15 feet.
   The latest approved estimate of cost for new work, made in 1893,
was $1,200,000. The latest (1933) approved estimate for cost of
maintenance is $3,000, biennially, or an average annual cost of $1,500.
   The existing project was adopted by the River and Harbor Act of
July 13, 1892 (H. Ex. Doc. No. 125, 52d Cong., 1st sess.). A map of
the project is published in the Annual Report for 1902, page 1422.
   Terminal facilities.-At Vicksburg, Miss., there is a paved munici-
pal wharf 375 feet in length with inclined ramp exits through sea
wall. This is considered adequate for existing commerce. Additional
data for terminal facilities is also contained in Transportation Series
No. 2, 1929, Transportation in the Mississippi and Ohio Valleys.
   Operations and results during fiscal year.-From October 16 to
November 27, 1933, U. S. combined dredge and snagboat Sunflower
removed 29,727 cubic yards of material from the channel between
the head of the canal and the Vicksburg city front. The work was
done by hired labor. The total cost and expenditure was $6,000,
charged to maintenance.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1904 at a saving of $20,789 under the estimated cost. The
canal is navigable at all times, the minimum depths being generally
about 6 feet greater than the simultaneous readings of the Vicksburg
gage. The controlling depth at the end of the fiscal year was about
6 feet.
Cost of new work       ______                                          $1, 179, 210. 87
Cost of maintenance    ---       -----------------------                    94, 099. 71

      Total cost-----------------------------------                     1, 273, 310. 58
      Total expended--------------------------------                    1, 273, 310. 58
  Proposed operations.--The balance unexpended will be applied to
maintenance of channel, using Government plant and hired labor,
as follows:
Maintenance:
   Dredging channel with U. S. combined dredge and snagboat Sun-
      flower, nine-tenths month (October) ---------------------  $5, 000. 00
   Balance remaining-------------                                 3, 285.60

      Total                      -       -----------                         3, 285. 60
   The additional sum of $5,500 can be profitably expended during
the fiscal year 1936, using Government plant and hired labor, in
dredging channel with U. S. combined dredge and snagboat Sun-
flower during November 1935.
                RIVERS AND HARBORS-VICKSBURG,                                                   MISS., DISTRICT                            749
                                        Cost ant financial summary
Cost of new work to June 30, 1934                                                                                              1----------------------------,
                                                                                                                                  179, 210. 87
Cost of maintenance to June 30, 1934                                                                                                 4, 099. 71
                                                                                                                                   9--------------------------
           Total cost of permanent work to June 30, 1934----------                                                            1, 273, 310. 58
Net total expenditures------------------------------------                                                                     1, 273, 310. 58
Unexpended balance June 30, 1934----------------------------                                                                        8, 285. 60
           Total amount appropriated to June 30, 1934----                                                                         281, 596. 18
                                                                                                                               1---------,

           Fiscal year ending June 30                          1930                1931                1932                1933          1934


Cost of new work__----------------------
Cost of maintenance- ------  __     _                          _                 $6, 957. 66            $56. 74        -                $6, 000. 00
Total expended        ...        ..-------------------------                      6, 986. 90                29. 50 ------------          6, 000. 00
Allotted------------------                       ..--------------------           8, 300. 00   ------------             3,000. 00       10, 000. 00


Balance unexpended July 1, 1933-        -        -- -            $4,. 285. 60
Amount allotted from War Department Appropriation Act ap-
proved Apr. 26, 1934----------------------------------- $5, 000
Amount allotted from War Department Appropriation Act ap-
   proved July 14, 1932                     --                            ----                 --             __        5, 000
                                                                                                                                    --
                                                                                                                                    10, 000. 00

           Amount to be accounted for------------------------------                                                                 14, 285.60
Gross amount expended__-                                                                                          -                   6, 000. 00

           Balance unexpended June 30, 1934                                 -8--                                                     8. 285. 60

Amount that can be profitably expended in fiscal year ending June 30,
1936, for maintenance 1      --     --                                                                                               5, 500. 00
    13. EXAMINATIONS, SURVEYS, AND CONTINGENCIES (GENERAL)

   The cost of the work during the year was $6,388.86. The expendi-
tures were $6,339.06. The balance unexpended June 30, 1934, will
be applied as needed during the fiscal year 1935 to payment of ex-
penses to be incurred in connection with the above items. The addi-
tional sum of $11,000 can be profitably expended during the fiscal
year 1936.
                          Cost and financial summnmary
Cost of maintenance to June 30, 1934----------------------------                                                                  $43, 235. 22
Plus accounts receivable June 30, 1934---------------------                                                                             13. 75
           Gross total costs to June 30, 1934---------------------------43, 248. 97
Minus accounts payable June 30, 1934                                                                                                    268. 54

           Net total expenditures-----------------------------------                                                                42, 980. 43
Unexpended balance June 30, 1934 __ -                                                                                               11, 292. 79

           Total amount appropriated to June 30, 1934----------------                                                               54. 273. 22

           Fiscal year ending June 30                      1930                    1931               1932                 1933         1934


Cost of new work---                                                       ------------              ------ ---
Cost of maintenance                     -               $4, 721. 89        $11, 655. 43             $6, 466. 83       $8,071. 73       $6, 388. 86
Total expended_                                          7, 498. 12          11, 924. 26             6, 551. 70        7, 641. 37       6, 339. 06

Allotted                                                 4,500. 00           14, 000. 00 _             --             14, 703. 29      10, 569. 93

1Exclusive of available funds.
750         REPORT             OF    CHIEF OF                 ENGINEERS,                 U.   S.    ARMY,         1934


Balance unexpended July 1, 1933______                                                                             _     $7, 061.92
Amount allotted from War Department Appropriation Act approved
   Apr. 26, 1934 __              ---- _             ---------------            _                                         11,   00.00

       Amount to be accounted for______________________________ 18, 061. 92
Deductions on account of revocation of allotment------------------- 430. 07

      Net amount to be accounted for                                                                                     17, 631.85
Gross amount expended6---------------                                                                   $, 665. 55
Less reimbursements collected        -.                                            __-                     326. 49
                                                                                                                          6, 339. 06

       Balance unexpended June 30, 1934--------------------_                                                             11, 292. 79
Outstanding liabilities June 30, 1934------------------------------                                                         238. 69

      Balance available June 30, 1934---------------------------                                                        11, 054. 10
Accounts receivable June 30, 1934---------------------------------                                                           13. 75

         Unobligated balance available June 30, 1934---------------                                                      11, 067. 85

Amount that can be profitably expended in fiscal year ending June 30,
1936, for maintenance ---------------------------------------- 11, 000. 00

                14. Other projects for which no estimnates are submitted
                   [Commercial statistics for these projects are given in pt. 2 of report]


                                                                      For last Cost and expenditures to
                                                                       full re-       June 30, 1934
                                                                      port  see
                                                                      port.seerequired                  Estimated amount
                                                                                                                     to
                 Name of project                                       annual                               required to
                                                                       report    New work       Mainte-      complete
                                                                        for-     New work        nance

                           2    -- -- -- -- -- -- -- -- -- -- -
    1. Little River, La.                  1                             1890        $2, 500. 00    -_._______     Completed.
    2. Bayou Bartholomew, La. and Ark. 2------                          1931        45, 873. 53    $42, 857. 25        Do.
    3. Saline River, Ark.2             --      -                        1931        26, 900. 00     12, 791. 67        Do.
    4. Steele and Washington Bayous and Lake                            1931        19, 049. 81      8, 000. 00   $40,000.
         Washington, Miss.' 2
    5. Tallahatchie and Coldwater Rivers, Miss__                       1933         43, 481. 48    173, 066. 02   Completed.
    6. Red River from Fulton, Ark., to mouth of                        1924        378, 573. 82    182, 157. 05   Maintenance only
         Washita River, Okla.' 3


  1Channels adequate for existing commerce.
  2 Abandonment recommended (H. Does. Nos. 1692 and 1694, 64th Cong., 2d sess, and 467, 69th Cong.,
1st sess.).
  3 Curtailment of project recommended (H. Doc. No. 947, 64th Cong., 1st sess.).


Status of reports called for by river and harbor acts and committee resolutions


                    Locality                                            Authorization act           TransmittedRecommended
                                                                                                    to Congress       ended


Ouachita River, Ark--                                                 Rivers and Harbors
                                                                        Committee Resolu-
                                                                        tion, July 26, 1934.
Red River, Ark. and La., from Fulton to the                           River and Harbor
  mouth.                                                                Act, Mar. 3, 1925.
Red River, Ark., Okla., and Tex., from Fulton,                        River and       Harbor
  Ark., to mouth of Washita River, Okla.                                Act, July 3, 1930.
Steele Bayou, Miss ------------------.                                     Do-------------         May 25, 1934        Unfavorable.

Sunflower River, Miss --                     ....                         Do--......---------------


   1Exclusive of available funds.
             RIVERS AND HARBORS-MEMPHIS,                    TENN.,    DISTRICT           751

  IMPROVEMENT OF RIVERS AND HARBORS IN THE
           MEMPHIS, TENN., DISTRICT

  This district includes the Arkansas, White, and St. Francis Rivers
and their tributaries in the northern half of the State of Arkansas,
the northeast portion of Oklahoma, the southeast portion of Kansas,
and the southern portion of Missouri; and the rivers in the western
part of the State of Tennessee that flow into the Mississippi River..
   District engineer: Maj. Edwin C. Kelton, Corps of Engineers,.
acting district engineer to August 2, 1933; Maj. W. M. Hoge, Corps
of Engineers, acting district engineer to November 1, 1933, and dis-
trict engineer since that date.
   Division engineer: Brig. Gen. Harley B. Ferguson, Corps of Engi-
neers.
                                        IMPROVEMENTS

                                         Page                                            Pagse
1. Arkansas      River,   Ark.   andl             . Oi;e. atinl a: cave of Locks
     Okla-                                75i         and Dais Nos. 1, 2, and 3,
2. White River, Ark_        __            754           Upper White River, Ark __          764
3. Black River, Ark. and Mo___
4. Current River, Ark. and Mo_
                                          757
                                          760
                                                7.8   Wolf River, Tenn-----------
                                                      Examinatins, surv eys, and
                                                                                          76T
5. St. Francis and L'Anguille                          contingencies (general)             769
     Rivers and Blackfish Bay(:u,
     Ark           -                      761

                       1. ARKANSAS RIVER, ARK. AND OKLA.

   Location.-This river rises in central Colorado and flows 1,460
miles in a southeasterly direction to the Mississippi River, 37 miles
above Arkansas City, Ark. (See Mississippi River alluvial valley
map, scale 1: 62,500, for river from mouth to vicinity Pine Bluffl
Ark.)
   Previous projects.-Adopted by the River and Harbor Acts of July
3, 1832; April 8, 1876; March 3, 1879; June 14, 1880; July 5, 18841
August 5, 1886; and August 11, 1888. The cost and expenditures
under these projects prior to June 30, 1902, were as follows:
For new work: Construction of permanent works                _                  $903. 311. 93
For maintenance:
    Maintenance of permanent works                             $315, 817. 40
    Operating snagboats_                                      1. 031, 654.13
                                                                               1, 347, 471. 53

      Total expended on previous projets __________________                    2,250, 783. 46
   For further details see page 1872, Annual Report for 1915.
  Existing project.-This provides for improving the river from its:
mouth to Neosho (Grand) River (465 miles) by snagging and dredg-
ing operations, by contraction works and revetments, and by a levee
near Pine Bluff, Ark. (117 miles above the mouth). The dimensions
of the channel are not specified. The several types of structures used
in the improvement are shown in the Annual Report of the Chief
of Engineers for 1902, page 1576. The ordinary freshet fluctuation
is about 16 feet throughout the portion of the river covered by the
project. The flood fluctuation is 60 feet at the mouth of the river,
32 feet at Little Rock, and 33 feet at Neosho (Grand) River. As the
      9
          1536--ENG 1934----48
752      REPORT    OF   CHIEF OF ENGINEERS,           U.   S.    ARMY,   1934

project is indefinite, no estimate of the cost of completion has been
made. The latest (1928) approved estimate for annual cost of main-
tenance is $40,000.
   The existing project results from the combination of prior proj-
ects by the River and Harbor Act of June 13, 1902. To this the River
and Harbor Act of March 2, 1907, added a levee near Pine Bluff to
prevent a cut-off (H. Doe. No. 71, 61st Cong., 1st sess.). Index to
published maps of sections of the river is given on page 1171, Annual
Report of the Chief of Engineers for 1921.
   Terminal facilities.-Other than a paved bank slope at Little Rock,
and private-owned log slips at saw and stave mills at Little Rock,
and sand derricks and elevators at Little Rock and Pine Bluff, there
are no terminal facilities. Those mentioned are adequate for existing
commerce.
   Operations and results .during fiscal year.-All operations were for
maintenance. The snagging operations were by hired labor with
Government plant. Repairs to revetment at Pine Bluff were made
by contract. In snagging operations during the periods July 27 to
August 10, 1933, and January 1 to January 12, 1934, the snagboat
Arkansas operating over the river below Pine Bluff (117 miles above
the mouth of the river) removed 149 snags, 2 stumps, and 4 drift
rafts from the channel, and felled 620 trees on caving banks. Re-
pairs to revetment at Pine Bluff in November and December 1933
were placing 1.250 linear feet of channel mattress (140 feet wide),
and 1,440 squares of pocket mattresses between Nebraska and Colo-
rado Avenues. The costs for maintenance during the year were:
Snagging operations                     -_--   __--         _-              $1, 489. 04
Revetment at Pine Bluff_           __                       _               44, 145. 46
      Total__                                                               45,   634. 50
  The expenditures during the year were:
Snagging operations, including care and repair of plant -------------    $711. 02
Revetment at Pine Bluff                          __                   44, 145. 46
      Total                                                                 44, 856. 48

   Condition at end of fiscal year.-The construction of permanent
works for general improvement of the river was suspended in 1902,
and completion of the project is not contemplated. Of the works
erected prior to 1902 only those in a short reach of river immediately
above Little Rock and the bank revetment at Pine Bluff remain
effective. The new works of permanent nature since then were for
protecting a levee against caving bank and for preventing a cut-off.
Snagging operations are the activities now relied upon to benefit
navigation. They render it easier and safer, but because of addi-
tional obstructions brought into the river by caving banks and shift-
ing channels these must be repeated continually.
   Under average conditions 4-foot draft can be taken to Little Rock
from the middle of February to the middle of July. From the
middle of August to the middle of December the draft is generally
limited to about 2 feet. During this fiscal year stages suitable for
navigation by boats of 4-foot draft obtained during the periods
September 1-13, January 9-14, March 26-April 17, and May 9-12.
               RIVERS AND HARBORS-MEMPHIS,                                   TENN., DISTRICT                              753
   The total costs under the existing project to the end of the fiscal
year were:
For new work:
    Construction of revetment in Trusty Bend---------------                                                   $60, 000. 00
    Construction of levee opposite Pine Bluff_--___________                                      __-
                                                                                                 -                 55, 200. 00
           Total        -----------        -----------------------------                                      115, 200. 00
For maintenance:
    Operating snag boats                                                                                      772, 35S. 14
    Maintenance of original permanent works, excepting those
      at Pine Bluff--------------------------------------18,                                                           771. 73
    Maintenance of works at Pine Bluff:
        Levee ------------------------------                 $16, 341.89
        Revetment______________________________              412, 056. 62
                                                                                                              428, 3981. 51
     Bank protection at Little Rock---------------------------                                                 35,559. 00
     Hydraulic dredging ..-      ______-________---                                                           667, 744. 15
           Total cost of maintenance                                                            __          , 922, 831. 53
                                                                                                           1______________________
      Grand total to June 30, 1934-----------------------------                                            2,038, 031. 53
   The total expenditures under the existing project to the end of
the fiscal year were $2,047,765.86.
   Proposed operations.-The balance unexpended July 1, 1934
 ($31,344.42) will be expended for channel and levee maintenance
under approximate distribution as follows:
For snagging operations during summer and fall of 1934---------- $19, 200. 00
For repairs to Pine Bluff revetment during August 1934----------   9,800. 00
For repairs to United States levee on Vaugine Neck opposite Pine
  Bluff during August and/or September 1934________________        2,344. 42

           Total-----___                                                                         ----              31, 344. 42
   The additional sum of $16,000 can be profitably expended during
the fiscal year ending June 30, 1936, in channel maintenance by
snagging operations in the summer and fall of 1935.
                                      Cost and financial summary
Cost of new work to June 30, 1934 _____________----__--$1, 018, 511. 93
                                       --
Cost of maintenance to June 30, 1934_______- --------
                                             ___         3, 270, 303. 0

      Total cost of permanent work to June 30, 1934------------                                            4, 288, 814. 99
Value of plant, materials, etc., on hand June 30, 1934_- ---- ___                                              10, 707. 75

      Net total cost to June 30, 1934 ___- ___--______-4,                                                     299, 522. 74
Plus accounts receivable June 30, 1934-------------------------                                                    364. 60

     Gross total costs to June 30, 1934___
                                        ---                                         ____-----4, 299, 887. 34
Minus accounts payable June 30, 1934                                                             -------            1----------------
                                                                                                                    1, 338. 02

     Net total expenditures ------               _------4,
Unexpended balance June 30, 1934__--------------------------
                                                                             _                                298, 549. 32
                                                                                                               31, 344.42

           Total amount appropriated to June 30, 1934--___-----__                                          4, 329, 893. 74

           Fiscal year ending June 30             1930           1931               1932               1933             1934


Cost of new work------------
Cost of maintenance                            $29, 610. 26   $35, 403. 41       $25, 183. 69    $10, 324. 05         $45, 634. 50
Total expended                                  31, 904. 95    26, 814. 41        23, 697. 99        10, 473. 77       44, 856. 48
Allotted                                        22, 696. 03    26, 750. 00 -2, 889. 62            21, 910. 68          62, 089. 96
754        REPORT         OF CHIEF OF ENGINEERS, U. S. ARMY,                   19 34

Balance unexpended July 1, 1933------------------------------     $14, 110. 94
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934---------                   8, 660. 00
                                                      $-----------------
Amount allotted from War Department Appropriation
Act approved July 14, 1932    -     --    --         55, 600. 00
                                                                   64, 260. 00
      Amount to be accounted for_                                                      78, 370. 94
Deductions on account of revocation of allotment and impounded
  funds --------------------            _                                               2, 170. 04

      Net amount to be accounted for---------------------------76,                         2'00. 90
Gross amount expended                                  $62, 262. 41
Less:
    Reimbursements collected          --    17 396. 33
      Receipts from            ales__9_______________.          60
                                                                       17, 405. 93
                                                                                       44, 856. 48
      Balance unexpended June 30, 1934--------------------------31, 344. 42
Outstanding liabilities June 30, 1934        -__1.       338. 02
Amount covered by uncompleted contracts                  574. 55
                                                                  1, 912. 57

        Balance available June 30, 1934_                                               29, 431. 85
Accounts receivable June 30, 1934 ___--                                                    364. 60

        Unobligated balance available June 30, 1934      ---------------               29, 796. 45

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1   -     -    _ _-_        ___--                           16, 000. 00

                                     2. WHITE RIVER, ARK.

   Location.-This river rises in northwestern Arkansas and flows
690 miles,. first north into Missouri, then southeasterly through Ar-
kansas to the Mississippi River, 45 miles above Arkansas City, Ark.
 (See Mississ'ppi River alluvial valley map, scale 1: 62,500 for river
from mouth to vicinity of Newport, Ark.)
   Previous projects.-Adopted by the River and Harbor Acts of
March 3, 1871; June 23, 1874; August 4, 1876; June 14, 1880; July
5, 1884; and March 3, 1899.
  The cost and expenditures on the previous project prior to com-
mencement of existing project in 1899, which applied solely to White
River, were $366,000, distributed as follows:
New work:
    For open-channel improvements-----                                               $351, 740. 11
    For special works at Batesville                                                    11. 061. 46

                                                                                      362, 801. 57
Maintenance for open-channel improvement                                                3, 198. 43

       Total--------------------------------------                                    366, 000. 00
   For further details see page 1874 of Annual Report for 1915.
  Fxisting project.-This provides for channel maintenance between
the mouth of the river and Batesville, 301 miles, by snagging and
dredging and by contraction works. The stream has an ordinary
freshet fluctuation of 15 feet throughout the portion covered by the
project, and an extreme flood fluctuation of 60 feet at the mouth, and
  ' Exclusive of available funds.
        RIVERS   AND HARBORS-      EMPHIS,   TENN.,   DISTRICT     755
of 36 feet at Clarendon, Newport, and Batesville. No estimate of
cost has been given, and since 1899 the work has been prosecuted
under annual estimates for maintenance by snagging and dredging.
The latest (1934) approved estimate for annual cost of maintenance
is $145,000.
   The existing project was authorized by the River and Harbor Act
of July 13, 1892, which made appropriation for completion of prior
project for improving the river from its mouth to Forsyth, Mo., and
provided that the additional sum appropriated should be expended
" in the discretion of the Secretary of War." The River and Harbor
Act of March 3, 1899, adopted a project for the improvement of the
river above Batesville by locks and dams, thereby making that place
the head of the open-river improvement project. Sketch map of
Little Rock district printed in Annual Report for 1911, opposite page
1877, includes a sketch outline of this stream.
    Terminal facilities.-Railway spur tracks are available for trans-
fer of freights between car and boat at Newport and Clarendon.
There are log slips for use of the owners only at those towns and at
Augusta, Des Arc, Crocketts Bluff, and St. Charles. Steamboat
warehouses are maintained at St. Charles and Crocketts Bluff pri-
marily for the use of the owners. In 1932 a rice terminal was erected
by local interests at Prestons Ferry, and a cotton, rice, and general
merchandise terminal was built at Devalls Bluff.
    Operations and results during fiscal year.-All actual operations
were for maintenance by hired labor with Government and leased
plant and consisted of snagging and dredging operations. The snag
ging was done between the mouth and Jacksonport (264 miles) by
the Government snagboats Arkcansas, C. B. Reese, and Tom Stallings.
By those operations 1,133 snags, 8 saw logs, 69 stumps, and 17 drift
rafts were removed from the channel, and 3,065 trees felled on caving
and sliding banks. The Arkansas operated between the mouth and
Little Red River (183 miles) between the dates of August 11, 1933,
and December 31, 1933. The C. B. Reese operated between the mouth
and DeValls Bluff (125 miles) between the dates of October 5, 1933,
and October 15, 1933, and laid up for the season at DeValls Bluff.
The Tom Stallings worked over the river between the mouth and
Jacksonport between the dates of July 20, 1933, and September 30,
1933, and laid up at the end of the working season at Newport, Ark.
 (258 miles above the mouth). The dredging operations were car-
ried on over the river at various shoals between the mouth and
Clarendon, Ark. (100 miles), by hired labor and the 'use of the leased
12-inch Diesel-powered cutter-head dredge Grizzly and its attendant
plant. Shoals were dredged to provide a 41/2-foot depth between
the mouth and DeValls Bluff (125) miles during the low-water
period between August 7 and December 28, 1933.
    The costs during the year were for snagging $27,535.67 and for
dredging $44,020.18, a total cost of $71,555.85. The expenditures for
the year were for snagging $21,506.39 and for dredging $44,020.18, a
total of $65,526.57.
    Conditions at end of fiscal year.-The project being for mainte-
nance, completion is not contemplated. All channels dredged in the
section of the river between the mouth of Black River and Batesville
756       REPORT     OF CHIEF OF ENGINEERS,          U.   S.   ARMY,    1934

have been obliterated by floods, and there is no increase in channel
depth over the shoals in that section of the stream. Snagging opera-
tions have materially improved the condition of the channel from
the mouth as far as the mouth of Black River, 265 miles.
   This river is generally spoken of as navigable to the mouth of
Black River by boats of 3-foot draft at any time. Under ordinary
conditions 6-foot draft may be taken to the mouth of Black River
from the first of February to the last of June, and again from the
middle of November to the end of December. During the fiscal year
ending June 30, 1933, a navigable depth of 41/2 feet was maintained
throughout the year as far as DeValls Bluff (125 miles). Three-
foot draft could be taken to the mouth of Black River (265 miles)
at any time, and 5-foot draft from February 28 to May 25, and for
an aggregate of 81 additional days during several short periods
between July 29, 1933, and January 29, 1934.
   The total costs under the existing project to June 30, 1934, are:
For maintenance :
      Snagging operations       --------------------------------- $652, 892. 60
      Dredging operations_-                                         98, 785. 74
        Total                                                                    678. 34
                                                                            7---------------------51,
Specials :
      Augusta, for prevention of cut-off___                                      314. 84
      DeValls Bluff, for prevention of cut-off        -                          883. 36
      Little Red River, snagging (1914)---------------------------               500. 00
        Total                   ------------------
                                      __                                       1, 698.20
Total costs to June 30, 1934____________________________________ 753, 376. 54
  The total expenditures were $791,037.92.
  Additional expenditures ($50,620.16) for the prevention of cut-off
at Augusta are shown on page 1060, Annual Report of Chief of
Engineers for 1924, under appropriation title White River at Augusta
Narrows.
  Proposed operations.-The balance unexpended at the end of the
year will be applied to maintenance of channel under approximate
distribution as follows:
Accounts payable July 1, 1934___________________________      __ $4, 098.17
Snagging operations, about 3 months with Government snagboats
  Arkansas and Stallings, July-December 1934- -__-_________-      25, 500. 00
Care and repair of snagging plant during high-water season------ 11, 209.00
Dredging between mouth and Newport with leased plant and hired
  labor, 5 months, August-December 1934____     _____________    100, 000. 00
Balance remaining___       ___--__________                         6, 975.18

        Total for all work__        __--------------______-               147, 782. 35
                                                                       -___-_
  The additional sum of $144,000 can be profitably expended during
the fiscal year 1936, as follows:
Snagging operations, about 4 months with Government snagboats,
  with hired labor, August-December 1935- .. -------------   __---   $30, 000
Care and repair of snagging plant during high-water season----------  14, 000
Dredging with leased plant and hired labor between the mouth of
  the river and Newport, Ark., August-December 1935------------ 100, 000
        Total for all work-----
                             ....                                               144, 000
             RIVERS AND HARBORS-MEMPHIS,                                TENN.? DISTRICT                    757

                                 Cost and financial snummary
Cost of new work to June 30, 1934---------------------------                                      $362, 801.57
Cost of maintenance to June 30, 1934-------------------------                                      756, 574.,97

      Total cost of permanent work to June 30, 1934------------ , 119, 376. 54
Value of plant, materials, etc., on hand June 30, 1934----------   37, 651. 45

      Net total cost to June 30, 1934                            1, 157, 027.99
Plus accounts receivable June 30, 1934--------------------------      1, 509.99

      Gross total costs to June 30, 1934-----------------------1, 158, 537. 98
Minus accounts payable June 30, 1934                                 , 500. 06
                                                                    1--------------------------

     Net total expenditures--------------------------------1, 157, 037.92
Unexpended balance June 30, 1934----------------------------147, 782.35

        Total amount appropriated to June 30, 1934--------------1, 304, 820. 27

        Fiscal year ending June 30          1930            1931             1932          1933           1934


Cost of new work-- -- - -- -- - -- - -       -     ----                                                   .............
Cost of maintenance-                     $42, 340. 35   $51, 610. 09     $39, 135. 18   $69, 385. 33   $71, 555. 85
Total expended__                          16, 165. 64     32, 804. 53     39, 481. 54    76, 834. 72    65, 526.57
Allotted_-    _                           20, 832. 78     30, 750. 00     42, 841. 28   124, 446. 22   124, 055.15


Balance unexpended July 1, 1933                             - $89, 253. 77
Amount allotted from War Department Appropriation Act ap-
proved Apr. 26, 1934      --------------------------------   127, 670. 0)

     Amount to be accounted for_                               216, 923. 77
Deductions on adcount of revocation of allotment and impounded
funds -------------------------------------------------------   3, 614. 85

      Net amount to be accounted for-------------------------- 213, 308.92
Gross amount expended                                       137. 69
                                                       $-----------------------------
Less:
    Reimbursements collected          -   $31, 525. 12
    Receipts from sales--------------           86. 00
                                                        31, 611. 12
                                                                    65, 526. 57

      Balance unexpended June 30, 1934------------------------ 147, 782. 35
Outstanding liabilities June 30, 1934                   , 500. 06
                                                       1----------------
Amount covered by uncompleted contracts------------    2, 558. 03
                                                                        4, 058. 09

     Balance available June 30, 1934                             43, 724.26
                                                                1----------------------
Accounts receivable June 30, 1934-------------------------------1,509. 99

        Unobligated balance available June 30, 1934                                                      234.25
                                                                                                   1----------------45,

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance ---------     --                        1-------------------
                                                                 -44,000.00

                           3. BLACK RIVER, ARK. AND MO.

  Location.--This river rises in Iron County, Mo., and flows in a
southerly direction 300 miles to White River, at Jacksonport, Ark.
(See Mississippi River alluvial valley map, scales, 1: 62,500 and,
1: 500,000.)
  1Exclusive of available funds.
758     REPORT   OF CHIEF OF ENGINEERS,      U.   S.   ARMY,   1934


    Previous projects.-Adopted by the River and Harbor Act of
March 3, 1871. It is not practicable to state the amount expended
under the project; however, it is known to have been very small.
For further details see page 1877, Annual Report for 1915.
    Existing project.-This contemplates improvement of the river
below Poplar Bluff, Mo., 213 miles, by snagging operations, by deep-
ening the water on shoals by wing dams, and by concentrating the
water into one main channel by the closure of secondary channels.
     The stream has an ordinary freshet fluctuation of 10 feet at Poplar
Bluff, 4 feet near Corning, Ark., and 15 feet at the mouth. Its
flood-stage fluctuations are 19 feet at Poplar Bluff, 11 feet near
  Corning, Ark., and 36 feet at the mouth. The original estimate was
 $80,800, to be expended in two working seasons (Annual Report
  for 1880, p. 1326). The River and Harbor Act of September 19,
  1890, appropriated an amount to complete the estimate and author-
  ized maintenance of the improvement. While dredging is not men-
tioned in the project, it is necessary as a means of maintenance and
has been authorized. The latest (1928) approved estimate for annual
cost of maintenance is $18,000.
     The existing project was adopted by the River and Harbor Acts
of June 14, 1880, and March 3, 1881. (Annual Report for 1880, p.
  1325.) The approximate location and course of the navigable por-
tion of this stream are shown in district map (sketch) printed in
Annual Report for 1911 opposite page 1877.
    Terminal facilities.-Private-owned log slips or chain conveyors
for the use of the owners are maintained at the several saw and
stave mills. The facilities are adequate for the existing commerce.
     Operations and results during fiscal year.-All operations were for
maintenance by hired labor and Government plant. The operations
  were by the snagboat Toz, Stallings, which worked over the river
from its mouth to Black Rock, 67 miles, and by the snagbarge Harve
Goodwin,      which worked over the river between Black Rock (67.4
miles above the mouth) and Poplar Bluff (213 miles above the
mouth). The results accomplished were the removal from the chan-
nel of 1,058 snags, 285 logs, 153 stumps, and 24 drift rafts, and the
felling of 347 trees. The costs during the year were $1>5,405.66, and
the expenditures $14,456.90, all for maintenance.
    Condition at end of fiscal year.-The project being for mainte-
nance, completion is not contemplated. The wing dams built at two
shoals and the dams built across the secondary channels at two
islinds during the early operations under this project are of no
effect now. Of the channels dredged under later operations, only
that at Julia Dean remains, and it is only fairly effective. Snagging
operations have materially improved conditions, and made naviga-
tion possible at Poplar Bluff (213 miles) by boats of 18-inch draft
and to Current River (96 miles) by boats of 2.5-foot draft during
low-water period. During the fiscal year the period for 4-foot navi-
gation to mouth of Current River was December 18 to May 31. The
period.of: 3-foot navigation to Poplar Bluff was December 18 to May
20. One and six-tenths feet was the controlling depth to Poplar
.Bluff duringthe period of lowest water.
     The costs were $80,000 for new work and $442,740.15 for mainte-
nance, a total of $522,740.15.         The total expenditures were
 $598,116.40.
               RIVERS AND HARBORS-MEMPHIS,                                    TENN., DISTRIICT                          759
  Proposed operations.-The balance unexpended at the end of the
year, $18,392.89, will be expended for maintenance of channel :by
snagging operations, using Government plant and hired labor, and
care and repair of plant, as follows:
Accounts payable June 30, 1934----------------------------------_                                                  $209. 34
Snagging with U. S. snagboat T.om Stallings, 2 m'onths during the
  summer and fall of 1934_-----     ---------------------------                                                    ,000. 00
Snagging with U. S. snagbarge Harve Goodwin, between the mouth
  and Poplar Bluff, Mo., 6 months during the summer and fall
  of 1934--    ---------------------------------------------                                                      6, 600. 00
Care and repair of plant during the high-water period following---.                                               5, 583.55

            Total for all work --                                                                                18, 392.89
  The additional sum of $19,000 can be profitably expended during
the fiscal year 1936 as follows:
Snagging operations about 5 months with Government plant and
  hired labor, August-December 1935--      __---------------          $13, 500
Care and repair of snagging plant during high-water season-----------   5, 500

            Total for all work--        ---------------------------------                                            19, 000

                                  Cost and financial summiary

Cost of new work to June 30, 1934     --------------------------                                             $80, 000. 00
Cost of maintenance to June 30, 1934-----------------------442,                                                   740. 15
      Total cost of permanent work to June 30, 1934-__---     --  _ 52_, 740. 15
Value of plant, materials, etc., on hand June 30, 1934____________ 76, 613 26

      Net total cost to June 30, 1934 ......                                   _     ...-------     ___      599, 353.41
Minus accounts payable June 30, 1934      -----                                    ----------                  1,237. 01

     Net total expenditures_-----   ----------------------- 598, 116. 40
Unexpended balance June 30, 1934-----------------------      18, 392. 89

        Total amount appropriated to June 30, 1934                                                                 509. 29
                                                                                                             6--------------16,

        Fiscal year ending June 30                 1930           1931             1932              1933             1934

Cost ofnew work_..............
Cost of maintenance                          $30, 280.05
                     .........------------------               $14, 979. 35    $22, 614. 31       $24, 697. 67     $15, 405.66
Total expended_-----___.-______-__            _- 72, 471.75     18, 111. 15     16, 676. 53        17, 939. 37       14, 456. 9
Allotted-                                 -      74, 590. 14    16,000. 00     -2,144. 36          31, 171. 16      17, 011. 85


Balance unexpended July 1, 1933---------------------__--     -- $15, 837. 94
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934------          -         $18, 170.00
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933-------------------------      244. 35
                                                                  18, 414. 35
      Amount to be accounted for_      ---------                                                                 34,252. 20
Deductions on account of revocation of allotment and impounded
funds------------------------_                                                                                   1, 402. 50
      Net amount to be accounted for.                                                     .-------               32, 849. 79
Gross amount expended                 __                                               $17, 037. 04
                                                                                              ,
Less reimbursements collected---------------__                                  __         2 580. 14
                                                                                                                 14, 456. 90
        Balance unexpended June 30, 1934_                                                                        18, 392. 8
760      REPORT     OF CHIEF OF ENGINEERS,       U.    S.   ARMY,   1934

Outstanding liabilities June 30, 1934_________              $1, 235. 90
Amount covered by uncompleted contracts ------------            528. 46
                                                                          $1, 764. 36
     Balance available June 30, 1934______________ _________              16, 628. 53
Amount that can be profitably expended in fiscal year ending June
  30, 1936, for maintenance 1__________19,                                   000. 00

                    4. CURRENT RIVER,        ARK. AND MO.

   Location.-This river rises in Dent County, Mo., and flows in a
southerly direction 200 miles to Black River, about 5 miles above
Pocahontas, Ark. (See Mississippi River alluvial valley map, scales
1: 62,500 and 1: 500,000.)
   Previous projects.-Adopted by the River and Harbor Act of June
10, 1872. The cost and expenditures thereunder and a further proj -
ect adopted by the River and Harbor Act of March 3, 1881, were
$7,000. For further details see page 1878, Annual Report for 1915.
  Eaisting project.-This provides for the improvement of the river
from its mouth to Van Buren, Mo., 94 miles, by snagging operations
and by contracting the channel at the worst shoals by wing dams.
The stream has an ordinary freshet fluctuation of 13 feet throughout
the portion covered by the project and an extreme flood fluctuation
of 26 feet at Van Buren, Mo., and of 22 feet at its mouth. The esti-
mate of cost for new work was $10,000, exclusive of amounts ex-
pended on previous projects. The latest (1928) approved estimate
for annual cost of maintenance is $4,500.
   The existing project was adopted by the River and Harbor Act of
August 18, 1894 (Annual Report for 1891, p. 2065). A sketch map
of the river is given in House Document No. 157, Fifty-first Con-
gress, second session.
   Terminal facilities.-Privately owned log slips and tie hoists for
the use of the owners only exist at Van Buren and Doniphan.
   Operations arnd resuilts during fiscal year.-None. There were no
expenditures. The costs were $37.15 for maintenance inspection.
   Condition at end of fiscal year.--The project being for mainte-
nance, completion is not contemplated. Operations under the project
have been lirited to removal of snags and boulders between Van
Buren and Doniphan, Mo., and removal of snags below Doniphan.
At the close of the fiscal year the channel obstructions are only
those that have been brought in by late freshets. The controlling
channel depths in low-water seasons are 3 feet from the mouth to-
White Horse Shoal, 31 miles; 14 inches to Caughorn Creek, 19 miles
farther; and 10 to 12 inches to Van Buren, an additional 46 miles.
   The costs have been $10,000 for new work and $112,954.04 for
maintenance, a total of $122,954.04. The expenditures were
$122,916.89.
 '.Proposed operations.-The balance unexpended at the end of the
year, $4,020.69, will be expended for maintenance by a chopping
party working between the mouth of Current River and Van Buren,
Mo.' removing snags and obstructions. These operations will absorb
the unexpended balance by about December 1, 1934.
  'Exclusive of available funds.
             RIVERS AND HARBORS-MEMPHIS,                                        TENN., DISTRICT                               761
   The additional sunm of $3,500 can be profitably expended during
the fiscal year ending June 30, 1936, in channel maintenance by snag-
ging operations between the mouth of the river and the Arkansas-
Missouri State line.
                                    Cost and financial summary
Cost of new work to June 30, 1934__       _         -_           $17, 000. 00
Cost of maintenance to June 30, 1934---------------------------112, 954. 04

      Total cost of permanent work to June 30, 1934--------------129, 954. 04
Minus accounts payable June 30, 1934--------------------------         37. 15
      Net total expenditures _________       _________________                                                     129, 916. 89
Unexpended balance June 30, 1934_      -------------------------                                                     4, 020. 69
        Total amount appropriated to June 30, 1934----------------                                                 133, 937. 58

        Fiscal year ending June 30                   1930           1931                   1932,            1933            1934


                  --
Cost of new work _-.                             -           --                                    ---                        --
Cost of maintenance    .-- ..---------- _   -     $1, 688. 51     $2, 607. 09        $2, 061. 40          $2, 377. 64         $37. 15
Total.expended---          _                    -16, 247. 95       2,607.09            2,061.40            2, 377. 64    ------------

Allotted---------------------------- -20,162. 67                   2, 750.00           -771.44             3, 437. 22       2, 899. 47


Balance unexpended             July 1, 1933           -.--                                                              $1, 121. 22
Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934------------------------------------------------                                                           2, 900. 00

      Amount to be accounted for_       _    --                                                                          4, 021. 22
Deductions on account of revocation of allotment                                                                                . 53

         Net amount to be accounted for                                        ---------                                 4, 020. 69
Gross amount expended _____________-
                           -     -                                    -
                                                                _______--                  ___-$12. 22
Less reimbursements collected-__                                                                 12. 22


       Pal''nce unekpended June 30. 1934_-                                                                               4, 020. 69
Out.ta1di-ing liabilities June 30, 1934----------------------37. 15
Amount°eovered by uncompleted contracts----------------171.66
                                                                                                    -_-                    208. 81.

         Balance availab'e June 30,                  '1934___         ------                                             3, 811. 88

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance --------------------------                                                                    3, 500. 00

      5. ST. FRANCIS AND L'ANGUILLE RIVERS AND                                                       BLACKFISH
                           BAYOU, ARK.

   Location.-The St. Francis River rises in St. Francois County,
Mo., and flows in a southerly direction 460 miles to the Mississippi
River, 8 miles above Helena, Ark. The L'Anguille River has its
source in the flat lands of Poinsett and Craighead Counties, Ark.,
whence it flows 109 miles in a southerlydirection, cutting through
Crowleys Ridge and entering the St. Fraincis Basin at Marianna and
flowing into the St. Francis River 12 miles above the mouth of the
   t Exclusive of available funds.
762    REPORT OF    CHIEF OF ENGINEERS,     U.   S. ARMY,   1934

latter. Blackfish Bayou rises in the west-central portion of Critten-
den County, Ark., flows 52 miles in a southwesterly direction, and
empties into the St. Francis River about 38 miles above the latter's
mouth. (See Mississippi River alluvial valley map, scales, 1: 62,500
and 1: 500,000.)
   Previous projects.-The original project for improvement of
St. Francis River was adopted by the River and Harbor Acts of
March 3, 1871; June 14, 1880; July 5, 1884; August 11, 1888; and
June 13, 1902, the latter adding L'Anguille River to the improvement.
The original project for L'Anguille River was adopted by River and
Harbor Act of June 18, 1878. The original project for Blackfish
Bayou was adopted by River and Harbor Act of June 25, 1910
 (H. Doc. No. 73, 65th Cong., 1st sess.). The total cost and expendi-
tures were $92,000.34 for new work and $90,345.15 for maintenance,
a total of $182,345.49. For further details see pages 1878 and 1879,
Annual Report for 1915, and page 1147, Annual Report for 1918.
   Existing project.-This provides for the removal of snags in
St. Francis River from its mouth to Marked Tree, in L'Anguille
River from its mouth to Marianna, and in Blackfish Bayou from its
mouth to Fifteenmile Bayou, with the object of maintaining the
channels clear of snags and similar obstructions at the lowest navi-
gable stage. The latest (1928) approved estimate for annual cost of
maintenance is $8,500.
   Within the limits of the project the St. Francis River has an ordi-
nary freshet fluctuation of about 12 feet when not affected by back-
water from the Mississippi River. The extreme flood fluctuation is
about 26 feet at Marked Tree, gradually increasing to 60 feet at the
mouth. These extreme flood fluctuations are produced by overflow
and backwater from the Mississippi River. When not influenced by
the flood stages of that river the maximum stage of the St. Francis
below Marked Tree does not exceed 20 feet. The ordinary freshet
fluctuation of L'Anguille River is about 6 feet and extreme flood
range 50 feet at Marianna; this latter, however, is due to backwater
from the Mississippi River. L'Anguille River when uninfluenced by
the Mississippi River never has a fluctuation exceeding 12 feet. The
fluctuation of stage in Blackfish Bayou is about 48 feet, due entirely
to backwater from the Mississippi River.
   The existing project was adopted by the River and Harbor Act of
March 2, 1919 (H. Doc. No. 60, 64th Cong., 1st sess.). A published
map of these streams is in that document.
   Terminal facilities.-At Parkin a railroad-owned log slip provides
a means of transfer of rafted commerce to railway car. Log slips or
chain conveyors for the use of the individuals owning them exist at
the several mills along the river. The present terminal facilities are
adequate for the existing commerce.
   Operations and results during fiecal year.-All operations were for
maintenance by hired labor and Government plant. The snagbarge
Stephen Anderson worked over the St. Francis River between the
mouth and 10 miles above Marked Tree (158 miles above the mouth),
over the L'Anguille River up to Marianna (8 miles) and in Black-
fish Bayou up to the mouth of Fifteenmile Bayou (6 miles). The
results of these operations are shown in the following table:
                RIVERS AND HARBORS-MEMPHIS,                                          TENK.,     DISTRICT              763
                                     Summary of snagging operations

                                                                                    Snags     Logs     Stumps         cut


St. Francis River-...--------         -                -      -            ------    1, 113     539             9      1, 006
L'Anguille River___-------- ---                                                          35      14 -     -                37
Blackfish Bayou_                --                   -----
                                                       --------       --                 38      29 -----                  56
       Total-----------                                           -                  1, 186     582            9       1,099


   The costs were $8,214.23 and the expenditures $6,685.62, all for
maintenance.
   Condition at end of fiscal year.-Snagging operations have been
the only activities under existing or previous projects. The chan-
nels within the limits of the project are in good condition for navi-
gation during medium and higher stages. At low stages snags are
the principal obstruction. Under average conditions boats of 4-foot
draft can ply St. Francis River to Marked Tree until the middle
of July, and boats of 2-foot draft until the latter part of August
each year. During period of lowest water, which generally occurs
in October and November, channel depths do not exceed 12 to 16
inches in any part of the river. The low-water depths in Blackfish
Bayou to Fifteenmile Bayou and L'Anguille River to Marianna are
but 8 to 10 inches. The navigation periods on those streams are
controlled in the main by backwater stages from the Mississippi
River. During this fiscal year the period for 4-foot draft to
Marked Tree prevailed through the entire year, and to Marianna for
an aggregate of 122 days. During periods of lowest water, con-
trolling depths were less than 2 feet.
   The costs under the existing project to June 30, 1934, were
$126,877.56 and the expenditures $137,617.70, all for maintenance.
   Proposed operations.-The balance unexpended at the end of the
year, $10,551.83, will be expended in channel and plant maintenance
by hired.labor and the use of Government plant approximately as
follows :
For snagging operations on the three rivers with Government plant
  and hired labor in the summer and fall of 1934----------------- $9, 200. 00
For care and repair of plant during the high-water period following_ 1, 351. 83

          Total for all work------------                                                                       10, 551. 83
  The additional sum of $9,500 can be profitably expended during
the fiscal year 1936 in, snagging operations on the three rivers with
Government plant and hired labor in the summer and fall of 1935.
                                          Cost end financial summary
Cost of new work to June 30, 1934-----------------------------                                                $92, 000. 34
Cost of maintenance to June 30, 1934---------------------------                                               217, 222. 71

      Total cost of permanent work to June 30, 1934-------------309, 223. 05
Value of plant, materials,, etc., on hand June 30, 1934---------- 10, 884. 62

          Net total cost to June 30, 1934_--------------                                                      320, 107. 67
Minus accounts payable June 30, 1934-__                               _---------------------                        144. 48

     Net total expenditures_ __           --------------------                                                319, 963. 19
                                         _-
Unexpended balance June 30, 1934_ ____--------------                                                           10, 551.83

          Total amount appropriated to June 30, 1934 -----------                                              330, 515. 02
764            REPORT           OF      CHIEF OF ENGINEERS,                   U. S. ARMY,               1934


           Fiscal year ending June 30                   1930           1931            1932          1933           1934


Cost of new work----------
Cost of maintenance ------- ---------------           $8, 739. 50   $10,911. 64    $11, 160. 35   $10, 196. 47     $8, 214. 23

Total expended ---------------------------             8, 676. 86     9, 473. 90    10, 208. 88     8, 746. 83      6, 685. 62

Allotted--------         ------------------------ -    8, 801.00      9, 750. 00     1, 964.14     17, 283. 50      7, 962.14


Balance unexpended July 1, 1933-------------------------    -- $9, 277. 89
Amount allotted from War Department appropriation act approved
Apr. 2, 1934_------  -------------------------------------     8, 770. 00
     Amount to be accounted for        -----                       18, 047. 89
Deductions on account of revocations, impounded funds ------------      07. 86
      Net amount to be accounted for------------------------17,                                                     240. 03
Gross amount expended -                                                                         $7, 805. 55
Less reimbursements collected----------------                 _                                  1, 117. 35
                                                                                                                 6, 688. 20
      Balance unexpended June 30, 1934                                                                             551.83
                                                                                                              1----------------------0,
Outstanding liabilities June 30, 1934                                                                44. 48
                                                                                                    1--------------------
Amount covered by uncompleted contracts---------------                                              252. 37
                                                                                                                   3916. 85
           Balance available June 30, 1934-------------                                  ----      __            10, 154. 98
Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -                    9, 500. 00

6. OPERATING AND CARE OF LOCKS AND DAMS NOS. 1, 2, AND 3,
                 UPPER WHITE RIVER, ARK.

   Location.-These works are on the White River, Ark.; no. 1 being
1 mile below Batesville, Ark.; and nos. 2 and 3 being 7.8 and 19.7
miles, respectively, above that city.
   Previous projects.-See Previous projects of White River, page
1874, Annual Report for 1915.
   Fxistinq project.-This provides for the construction of 10 fixed
dams with concrete locks to give 4 feet navigation the year around.
The River and Harbor Act of March 2, 1907, after providing for the
completion of the third lock and dam, abandoned further cbnstruc-
tion work, its language fixing the appropriation carried therein as
the final one. The stream is nontidal, with an ordinary freshet fluc-
tuation of 16 to 18 feet, and with an extreme flood fluctuation of 38
feet just below Lock No. 1 and of 51 feet at Calico Rock, 39 miles
above Lock No. 3. The estimated cost for the 10 locks and dams
originally projected was $1,600,000. The maintenance of the three
that have been constructed is provided for under the permanent in-
definite fund for operation and care of canals and other works of
navigation under varying annual estimates.
   The existing project was adoptec by the River and Harbor Act
approved March 3, 1899 (H. Doc. No. 78, 54th Cong., 2d sess.). The
River and Harbor Act of March 2, 1907, directed the abandonment
of further new work on the project (H. Doc. No. 150, 59th Cong., 1st
sess.).

     1 Exclusive of available funds.
               RIVERS AND HARBORS-MEMPHIS,                                           TENN.,        DISTRICT               765
  The locations, dimensions, etc., of the three completed locks and
dams are as follows:

                                           Lock No. 1                        Lock No. 2                      Lock No. 3


Location__..
          -         _Batesville
                   .........-                                         Earnheart...__...---             Walls Ferry.
Distance from mouth of river-        300.6 miles       --------       309.4 miles----------...         321.3 miles.
Dimensions of locks:
    Length available-..-----         147 feet -___        _        __ 147 feet__-- ------              147 feet.
    Width between walls ------       36 feet       -              _- - 36 feet___.____             _   36 feet.
    Lift at low water__ ......       13.5 feet                         14 feet_____                    15 feet.
   Depth on lower sill --------      5.5 feet     --                  5 feet_                        4 feet.
   Depth on upper sill               5 feet_ --                           _do .....                  5 feet.
   Foundations .. ____.---           Bedrock__  -    _                Bedrock          __
                                                                                    -____          _ Bedrock.
Dams:
    Kind of _______________
                -       .            Fixed ..-     -_______           Fixed________________            Fixed.
    Type of construction -.          Timber crib filled with Timber crib filled with Timber crib filled with
                                      stone.                   stone.                  stone.
    Length------------ -------       660.5 feet_ -----        ---     658 feet ...              - 750.7 feet.
                                                                                          .--------
Date of completion___------   ----   1904 ---------       -----       1905_ -----------            - 1908.
Cost of construction -----    --- $278,587.56.. --         ----       $297,627. 94     _ __.....       $236,981.31.


   All dams are with concrete caps.
   The approximate location of these locks and dams is shown on
district map (sketch) printed in Annual Report for 1911, opposite
page 1877.
   Terminal facilities.-Log slips, derricks, and conveyors exist at the
several woodworking establishments, all for the individual use of
the owners. The terminal facilities are adequate for the present
commerce.
   Operationsand results during fiscal year.-All work was for main-
tenance with hired labor and Government plant.
   Lock and Dam No. 1.-Other than the operations of the lock and
routine maintenance of buildings and grounds, work consisted in
grading and paving 1,023 square yards of bank with 341 cubic yards
of one-man stone at lower end of riprap below west abutment of dam.
   Lock and Dam No. 2.-Other than the operations of the lock and
routine maintenance of buildings and grounds, work consisted of
paving 2,160 square yards of bank with 725 cubic yards of one-man
stone at lower end of riprap below north abutment.
   Lock and Dam No. 3.-Work during the year was limited to opera-
tion of the lock and to routine maintenance of appurtenant river
structures and buildings and grounds.
                                          CHANNEL DREDGING

   The dredging operations consisted in dredging a cut 420 feet long,
30 feet wide, and containing 235 cubic yards of stone and 910 cubic
yards of gravel, into lower approach to Lock No. 1 during the month
of July, and in dredging 341 cubic yards of sand and gravel from a
cut 105 feet long by 30 feet wide at Earnhart Shoal in December 1933.
   Floating plant.-Repair to floating plant was limited to routine
annual overhaul.
   The cost for operation, maintenance, and repair of the works dur-
ing the fiscal year was $34,342.88 and the expenditures during the
fiscal year were $19,517.83.
   Condition at end of fiscal year.-The new work accomplished to
the end of the fiscal year is the construction of the three locks and
 766            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                      1934

dams mentioned under paragraph Existing project. They represent
the project as 30 percent completed when further construction was
suspended. These works give, by aid of dredging, all-year-round
:slack-water navigation for 3-foot draft from 1 mile below Batesville
to Guion, 33 miles.
      The total costs to the end of the fiscal year were:
For new work (construction of locks and dams)        .-                                                           $813, 196. 81
For maintenance (operating and care) ---------------------                                                        , 149, 027.42
             Total cost to June 30, 1934___________________________                                              1, 962,224. 23
      The total expenditures to the end of the fiscal year were:
For, new work (construction of locks and dams)                                      ---------------          _ $813, 196. 81
For maintenance (operating and care)_____________________                                                     1, 173, 794.26
             Total expenditures to June 30, 1934--------------                                                   1, 986, 991. 07
   Proposed operations.-The locks and dams will be operated and
maintained under allotments from appropriations made available for
such purposes.
          Cost and financial, smnmary for maintenance and improvement funds

Cost of new work to June 30, 1934___________________________                                                       $813, 196. 81
Cost of maintenance to June 30, 1934___________________________

      Net total expenditures____________________________                                                               813, 196. 81
Total amount appropriated to June 30, 1934-------------------                                                          813, 196. 81
                  Cost and financial summary for operating and care funds

Cost of maintenance to June 30, 1934_---       --                                                              $1, 149, 027. 42
Value of plant, materials, etc., on hand June 30, 1934___ ______                                                    25, 185. 78

      Net total cost to June 30, 1934______________                                                               , 174, 213. 20
                                                                                                                 1___________
Minus accounts payable June 30, 1934 ________-- _____-------__                                                           418. 94

      Net total expenditures _--------------__                                                                   1, 173, 794. 26
Unexpended :balance June 30, 1934______________-__________                                                            3, 498. 58

            Total amount appropriated to June 30, 1934 ____________                                              1 , 177, 292. 84

            Fiscal year ending June 30                         1930           1931           1932           1933            1934


Cost of new work---.---                  -
                                    ------..    ---- -- ------------      ---- --------    -------   --------------.      ---------
Cost of maintenance.....----------------------             $51, 176. 90   $41, 356. 58    $41, 619. 13   $58, 397. 16     $34, 342. 88

rTotal expended-- .--....--..--------------------.         54, 463. 51    37, 044. 65     64, 260. 30    47, 974. 19      19, 517. 83

Allotted....................----------------------------    50, 000. 00    45, 000. 00     50, 000. 00    47, 884. 92      16, 875. 81


Balance unexpended July 1, 1933____----------        -----------    $6, 140. 60
Amount allotted from permanent indefinite appropriation, section 6,
  River and Harbor Act, Mar. 3, 1909   _-------------------------   18, 560. 00

       Amount to be accounted for___--------------------         24, 700. 60
]Deductions on account of revocation of allotment, and impounded
  funds-__-- -  ----------------------                            1, 684. 19

            Net amount to be accounted for__------------------------                                                    23, 016. 41
           RIVERS   AND HARBORS--M EMPHIS,         TENN., DISTRICT             767
Gross amount expended____-__________________________      $19, 714. 48
Less reimbursements collected____-- ___- -- ________           196. 65
                                                                         19, 517. 83
      Balance unexpended June 30, 1934________________________            3, 498. 58
Outstanding liabilities June 30, 1934____________________  418. 94
Amount covered by uncompleted contracts______________       600.90
                                                                            479. 84
     Balance available June 30, 1934________________________ 3, 018. 74
Amount allotted for fiscal year 1935_______________________________ 31, 500. 00

      Balance available for fiscal year 1935________________________ 34, 518. 74

              7. WOLF RIVER (MEMPHIS HARBOR),             TENN.

   Location.-Wolf River rises in Benton County, Miss., and flows
generally northwesterly about 100 miles, through Shelby County,
Tenn., emptying into the Mississippi River within the corporate
limits of the city of Memphis, Tenn. (See Mississippi River alluvial
valley map, scale 1: 62,500.)
  Previous projects.-The River and Harbor Act of August 7, 1894,
authorized dredging at the mouth of Wolf River as an item in the
improvement of Memphis Harbor, the work being carried out under
the supervision of the Mississippi River Commission.
  Existing project.-No project has been authorized by Congress.
  The improvement of Wolf River, Tenn., to provide a channel 9
feet deep at low water (71/2 feet below zero on the Memphis gage)
from its mouth to North Second Street Road with bottom widths of
250 feet from the mouth to Keel Avenue and 200 feet from Keel
Avenue to North Second Street Road, as recommended by the Chief
of Engineers in Rivers and Harbors Committee Document No. 26.
Seventy-second Congress, first session, at an estimated cost of
$738,000, with $64,000 annually for maintenance, was included in the
Public Works program under the National Industrial Recovery Act.
(Sketch map is published in the above document.)
  Recommended modifications of project.-Includedin Public Works
program.
   Local cooperation.-The work included in the Public Works pro-
gram is subject to the condition that local interests shall furnish
                                               and
free of cost to the United States all rights-of-way required for
channel enlargement and straightening,        suitable areas with re-
taining levees where needed for disposal of dredged material during
initial construction and future maintenance as and when needed, and
shall furnish assurance satisfactory to the Secretary of War saving
the United States free from damages resulting from the work. These
conditions are being complied with.
   Terminal facilities.-There are 16 terminals operating in the port
of Memphis, 5 being located on the Mississippi River front, 3 on
Tennessee Chute, and 8 on Wolf River. (See pp. 74, 89, and 90 of
" Transportation in the Mississippi and Ohio Valleys, Transporta-
tion Series No. 2, 1929.")
   Operations and results during fiscal year.-There were 1,092,562
cubic yards of material removed under contract during the year. The
length of the channel dredged was 6,900 linear feet, of which 1,900
     91536-ENG 1934-49
768             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

feet, 200 feet wide, was completed, and 2,000 feet, 200 feet wide, and
3,000 feet, 250 feet wide, was partially completed.
   The costs under the project to June 30, 1934, were $173,782.83, and
the expenditures $135,410.76, all for new work.
  Condition at end of fiscal year.-A channel 9 feet in depth was
available throughout the year with the exception of a few days in
March, when there was 7 feet in the channel, and a few days in May,
when there was 7 to 8 feet in the channel. The work is 32.7 percent
complete; approximately 2,268,438 cubic yards remain to be removed
to complete the project.
  Proposed operations.-The balance unexpended June 30, 1934,
from funds allotted under the provisions of the National Recovery
Act ($467,589.24), will be applied to completion of present contract
dredging operations to provide a navigable channel from the mouth
to the North Second Street Road, during the period July 1934 to
February 1935.
  The additional sum of $64,000 can be profitably expended during
the fiscal year ending June 30, 1936, by dredging operations for
channel maintenance within the limits stated above.
                                                Cost and financial summary

Cost of new work to June 30, 1934________ _______---__$173,                                                               782. 83
Cost of maintenance to June 30, 1934_

      Total cost of permanent work to June 30, 1934 ------------                                                      73, 782. 83
Minus accounts payable June 30, 1934 ________________________                                                         38, 372.07

     Net total expenditures____-------------------    ___135,410. 76
Unexpended balance June 30, 1934_________----------_____  467, 589. 24

            Total amount appropriated to June 30, 1934- ____-____-_                                                  603, 000. 00

            Fiscal year ending June 30                             1930            1931       1932          1933          1934


Cost of new work------.............---------------------------------------------                                       $173, 782.83
Cost of maintenance-------------------------------------------------------------------------------
Total expended..-------------------                     ------       -----     ---------------------------------        135, 410. 76
Allotted-------------------------------------                                ------------------------------------       603,000. 00


Amount allotted from National Industrial Recovery Act approved
June 16, 1933 ------------------------    ---------           $738, 000.00
Deductions on account of revocation of allotment_               135, 000. 00
                                                                1_____---__

      Net amount to be accounted for.      ______________--     ______                                               603, 000. 00
Gross amount expended --------------------------- $152, 934. 51
Less reimbursements collected __________-----------         17, 523. 75
                                                                                                                     135, 410. 76

      Balance unexpended June 30, 1934__________---------------                                                      467,589. 24
Outstanding liabilities June 30, 1934______           38, 372. 07
Amount covered by uncompleted contracts ------------ 336, 716.15
                                                                                                                     375, 088.22

            Balance available June 30, 1934______                                                         __          92, 501.02

Amount that can be profitably expended in fiscal year ending June
                                                            - - - - -- - - - - - - -- - - - - - - - - -- - - - - -
    30, 1936, for maintenance 1                                                                                       64, 000. 00
    1Exclusive of available funds.
              RIVERS AND                  HARBORS-MEMPHIS,                    TENN., DISTRICT                       769
    8. EXAMINATIONS, SURVEYS, AND CONTINGENCIES (GENERAL)

  The cost of work during the year amounted to $7,914.08; the
expenditures were $7,907.59. The balance unexpended June 30,
1934, will be applied as needed during the fiscal year 1935 to pay-
ment of expenses to be incurred in connection with the above items.
The additional sum of $19,000 can be profitably expended during
the fiscal year ending June 30, 1936.
                                          Cost and financial sucInary
Cost of maintenance to June 30, 1934__                                              ----                  $47, 372.30
Plus accounts receivable June 30, 1934_-                                                                        53.96

     Gross total cost to June 30, 1934___                                                                  47, 426.26
Minus accounts payable June 30, 1934_                                                                           228. 63

         Net total expenditures_______                                                                     47, 197. 63
Unexpended balance June 30, 1934_ __                                                                         19, 257. 72
         Total amount appropriated to June 30, 1934 ______________                                         66, 455. 35

         Fiscal year ending June 30                 1930          1931            1932           1933            1934

Cost of new work .-       .-        -.-
                                    -
Cost of maintenance---- .........                 $2, 047. 37   $5, 812. 88    $14, 138.26    $15, 874. 71      $7, 914. 08
Total expended---------------------                2, 126. 18    4,873.82       14, 737. 90    15, 967. 14       7, 907. 59
Allotted-----------------.-.---------              4, 000. 00    6, 000. 00     12, 500.00     22, 984. 84      18, 885. 51


Balance unexpended July 1, 1933-------------------------------  $8,279. 80
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934___ _____________-------$12,430. 00
Amount allotted from War Department Appropriation
   Act approved July 14, 1932------------------__                                 __         7, 000. 00
                                                                                                           19, 430. 00

     Amount to be accounted for___-__--______    ______--___--- 27, 709. 80
Deductions on account of revocation of allotment and impounded
funds---------------------------------------------------------     544. 49
      Net amount to be accounted for---------------------------      27, 165. 31
Gross amount expended ----------------------------        8, 492. 14
Less reimbursements collected ______--_                      584. 55
                                                                      7, 907. 59
      Balance unexpended June 30, 1934______            ____                                  ____     19, 257. 72
Outstanding liabilities June 30, 1934 ------------------                                       228. 63
Amount covered by uncompleted contracts__         __- -     -                                  518. 46
                                                                                                           747.09

      Balance available June 30, 1934_________-                       18, 510. 63
                                                             -_____________
Accounts receivable June 30, 1934------------------------------.           53. 96
         Unobligated balance available June 30, 1934______________                                         18, 564. 59
Amount that can be profitably expended in fiscal year ending June
   30,   1936,    for maintenance 1______________________19,                                                    000. 00

  SExclusive of available funds.
 770         REPORT OF CHIEF OF ENGINEERS, U.                                           S.    ARMY,        1934

Status of reports called for by river and harbor acts and committee reso~sitions

                Locality                      Authorization                   Transmitted
                                                                              to Congress      Document
                                                                                                  no.          Reeommenda-
                                                                                                                   tion
                                                                              to   Congress       no.               to;




Arkansas River and tributaries,         River and Harbor Act,                      _
   Ark. and Okla.                           Jan. 21, 1927.
Arkansas River, Kans., Okla. and        Flood Control             Act,
  Ark. (preliminary examination for        May 31, 1924.
  flood control)
Cache River, Ark     ---------      -   River and Harbor Act, _-.........................
                                           Jan. 21, 1927.
Canadian North Fork, Tex. and           Flood Control Act,                                       -
  Okla. (preliminary examination           May 31, 1924.
  for flood control).
Canadian River, N. Mex., Tex.,-... do
  and Okla. (preliminary examina-
  tion for flood control).
Cimarron River, N. Mex. and Okla. ....
                                     _do............_                     _             .____..------------
   (preliminary examination for
  flood control).
Deep Fork, Okla. (preliminary ex-        _..do_         -----
amination for flood control).
Hatchie River, Tenn------------          Rivers and Harbors                   May 25, 1934            .-----   Unfavorabbl.
                                            Committee           resolu-
                                            tion, Feb. 9, 1934.
Little River, Okla. (preliminary ex-     Flood Control Act,
  amination for flood control).            May 31, 1924.
4Obion  and Forked Deer Rivers,          Rivers and Harbors
  Tenn.                                    Committee resolu-
                                           tion, Feb. 9, 1934.
.-Verdegris River, Okla. (preliminary    Flood Control Act,
   examination for flood control).          May 31, 1924.


    IMPORVEMENT OF RIVERS AND HARBORS IN THE
              ST. LOUIS, MO. DISTRICT
   This district includes the Mississippi River between the Ohio
River and Clarksville, Mo., and the Missouri River between the
mouth and Hermann, Mo. That section of Mississippi River between
Missouri River and Clarksville is included in the report of Missis-
:sippi River between Missouri River and Minneapolis, Minn., and
that portion of Missouri River in this district is included in report
of Missouri River, Kansas City to the mouth.
   District engineer: Maj. William A. Snow, Corps of Engineers, to
December 1, 1933; Capt. Bartley M. Harloe, Corps of Engineers,
:since that date.
   Division engineer: Col. George R. Spalding, Corps of Engineers,
to November 27, 1933, and Lt. Col. Edmund L. Daley, Corps of
Engineers, since that date; Lt. Col. Richard C. Moore, Corps of
Engineers, was acting division engineer, July 1 to 28, 1933.
                                               IMPROVEMENTS
                                                  Page                                                                    Page
1. Mississippi   River between                                   4. Removing snags and wrecks
    the Ohio and Missouri                                             from the Mississippi River,
     Rivers __---------------                      770                below the mouth of the
                                                                      Missouri River, and from
2. Mississippi River between the                                      the Old and Atchafalaya
    Missouri River and Clarks-                                        Rivers ....   - - - -- - -                          778
     ville, Mo __----------------                  783              Examinations, surveys, and
3. Missouri River between the                                         contingencies (general) __-                          781
     mouth and Hermann, Mo__                        823             Other projects for which no
                                                                      estimates are submitted___                           782

1. MISSISSIPPI RIVER BETWEEN THE OHIO AND MISSOURI RIVERS

   Location.--The Mississippi River rises in Lake Itasca, Minn., flows
in a southerly direction 2,434 miles, and empties into the Gulf of
Meicn_          The nortion included in this renort                                     embraces the 195-mile
              RIVERS AND HARBORS-ST.                           LOUIS,      MO., DISTRICT                   771
section known as the " middle Mississippi ", between the tributaries
Ohio and Missouri Rivers, 1,078 to 1,273 miles from the Gulf.
  Previous projects.-The original project for the improvement of
the Mississippi River between the Ohio and Missouri Rivers was
recommended by a board of engineers in a report dated April 13,
1872, and concurred in by the Chief of Engineers. The cost and
expenditures for the middle Mississippi prior to the adoption of the
present project in 1881 were $1,610,000 for new work.
   (For further details see p. 1879 of the Annual Report for 1915.)
   Existing project.-This provides for obtaining and maintaining a
minimum channel depth of not less than 9 feet, a minimum width of
not less than 300 feet at low water, with additional width in bends
from the mouth of the Ohio River (1,078 miles from the Gulf) to the
northern boundary of the city of St. Louis, 191 miles; thence 200
feet wide, with additional width in bends to the mouth cf the Mis-
souri River, 4 miles. all to be obtained by regulating works and
dredging.
   First, by regulating works, for closing sloughs and secondary chan-
nels, and narrowing the river. The following table shows the project
width for middle Mississippi:
                                                               Low water        Mean stage          Bank full
            Subdivision of river                Length         i                W                      t
                                                             Width     Mean    Width     Mean     Width    Mean
                                                                       depth             depth             depth

                                                -files        Feet     Feet     Feet     Feet      Feet    Feet
River Des Peres to Grays Point_    --125.                7    2, 250       8    3, 250    14. 8   4, 600     23. 3
Commerce to Commercial Point                .      7. 2       2, 500       8    4, 500    1.3.0   6,000      20. 3
Commercial Point to Ohio River                    32. 2       2 000        8    3, 500    14. 0   4, 800     24. 9


   Building new banks where the natural width is excessive and
protecting new and old banks from erosion where necessary to secure
permanency.
   Second, by dredging or other temporary expedients to maintain
channels of project dimensions.
   The project for regulating works was adopted in 1881 (Annual
Report, 1881, p. 1536). Dredging was introduced as a part of the
project by the River and Harbor Acts of 1896, 1902, 1907, and 1922,
the latter of which provides for dredging channels to landing places
on the main river and subsidiary sloughs for the river above the
mouth of the Missouri River. That part of the project for the middle
Mississippi which proposed regulating works was practically abro-
gated by acts of March 3, 1905, March 2, 1907, and the joint resolution
of June 29, 1906. The River and Harbor Act of June 25, 1910, re-
stored regulating works to the project and began appropriations with
a view to the completion of the improvement between the Ohio and
Missouri Rivers within 12 years, at an estimated cost of $21,000,000,
exclusive of amounts previously expended.       (H. Doc. No. 50, with
accompanying atlas, 61st Cong., 1st sess.; and H. Doc. No. 168. 58th
Cong., 2d sess.) The River and Harbor Act of January 21, 1927,
provided for a depth of 9 feet and width of 300 feet from the Ohio
River to the northern boundary of St. Louis and increased the esti-
mate for maintenance to $900,000 annually. (Rivers and Harbors
Committee Doc. No. 9, 69th Cong., 2d sess.) The River and Harbor
Act of July 3, 1930, modified the project between the northern bound-
772         REPORT           OF CHIEF OF              ENGINEERS,                U.     S.    ARMY,           1934


ary of the city of St. Louis and Grafton (mouth of Illinois River)
to provide for a channel 9 feet deep and generally 200 feet wide with
additional width around bends, at an estimated cost of $1,500,000,
with $125,000 annually for maintenance. (Rivers and Harbors
Committee Doc. No. 12, 70th Cong., 1st sess.)
   The estimated cost of new work, revised in 1934, is $43,000,000,
with $1,300,000 for annual maintenance.
   Terminal facilities.-The water terminal and transfer facilities of
the district are fully described as of December 31, 1918, in House
Document No. 652, Sixty-sixth Congress, second session, pages 1211-
1239. Additional data for terminal facilities is also contained in
Transportation Series No. 2, 1929, Transportation in the Mississippi
and Ohio Valleys.
   Operations and results during fiscal year.-River stages were very
favorable to construction work, which was carried on extensively
by hired labor with Government plant and by contract throughout
the year. The districts standard specifications for construction work
were used. Regulating works were maintained, and project dimen-
sions of channels were secured by dredging. Location, quantities,
and costs of regulating works follow:

                                                                             Miles                    Dikes or hurdles
                                                                             above
                  Class of work and locality                                mouth
                                                                            of Ohio         No.       Linear feet        Costs
                                                                            Ri ser

New work, by contract:
   Greenfield Bend                                    -                           5
   Cairo Protection_____________________________                                  7               2        2, 380      $64, 313.75
   Elk Island-Boston Bar_                                                         9
   Beechridge-Elk Island ____________________-______-_                           11           15           7, 655      198, 947. 21
   Sliding Towhead _--- --- -- --- --
                                    _ --- -- --- -- -- --                        24
   Dogtooth Island-Brooks Point_                                                 24               4        4, 340      107, 440. 39
   Brooks Point, Ill   _ ____________________________   _                        25               6        5, 480      156, 709.74
   Pow ers Island ___- --- ------------------------                              36
   Clear Creek-Graysboro ........                                                45
   Cape Girardeau, Mo-_-                                                         49
   Giboney Island                                                                50               5        4, 530        88, 925. 17
    Little Flora-Swiftsure .       .        .     .      .         .             57
    Devils Island-Kinney Point_______________                                    60                        6, 000      153, 620. 59
    Hanging Dog Island_                                                          70               6        4, 500       99, 369. 07
    W ittenberg, M o.. ...................    ..................                 82
    Brunkhorst, Ill-_                                                            86               7        3, 540      106. 984. 36
    Seventy-Six, M o .. . . . . . . . . . . . . . . . . . .                      92
    Liberty Bend, Ill_                                                           97
    Liberty, Mo_                                                                 99               8        3, 080        96,   265.03
    Rockwood, Ill_                                                              100               4        1,795         51,   764. 57
    Kaskaskia Island_                      __                                   113               4        2, 810        85,   719. 27
    Kaskaskia Island and Ste. Genevieve, Ill                                    120               4        3, 000        83,   454.73
    Ellis Grove, Ill.-Ste. Genevieve, Mo_                                       121
    Establishment Island______                                                  129
    Fort Chartres, Ill. and Mo_ ___                      _                      131               6        7, 070      177, 884. 90
    Establishment-Sycamore-Harlow                                __             135               7        5, 615      215, 561. 39
    Danby Landing-James Landing                          _                      141
    Calico Island-Sulphur Springs __                                            153           12           4, 500      145, 309. 97
    Chesley Island-Pulltight _                                                  161            6           3, 145      111, 917. 66
      Total_                                                                                 102          69,440      1,944,
                                                                                                                           187.80
New work by United States plant and hired labor:
   Dogtooth Bend ---- .. .. ... .. .. .. ... .. ..            ..       ..         22
   Sliding Towhead  -......                                                       24
   Cape Girardeau, Mo_                                                            49
   Brunkhorst                                                                     85        (1)           (1)             3.,093. 62
   Seventy-Six, Mo                                                                90
   Rockwood, Ill___                                                              102              2             860      11, 004. 78
      Total __           _                                                                        2             860      14, 098. 40
    Maintenance by United States plant and hired labor...____1____                                          3, 240       86, 734. 95

   Work completed during fiscal year 1933.
                  RIVERS AND HARBORS-ST. LOUIS, MO., DISTRICT                                                                            773
                                                                             Bank protection (revetment)

                                                Miles
                                                  labove                            Mattress
         Class of work and locality             mouth                                                         Paving
                                                                                                              squares
                                                of Ohio       No.           Linear           Squares           100                Costs
                                                 River                        feet,             100           square
                                                                           bank pro-          square            feet
                                                                            tected              feet


New work, by contract:
   Greenfield Bend                                      5             2         3, 595            4, 866        4, 235         $214, 588. 17
   Cairo Protection_                                    7   .......                      -              -
   Elk Island-Boston Bar------------------              9             3         4, 040            4, 359        2, 778          150, 085. 76
   Beechridge-Elk Island_                              11             2         1, 395            1, 603        2, 212           67, 035. 67
   Sliding Towhead_._         _    -_                  24   .___                (1)               (1)           (1)               2, 392. 56
   Dogtooth Island-Brooks Point                        24
   Brooks Point, Ill._                                 25             1         3, 160            3, 389        2, 582          103, 721.74
   Powers Island -_-_-                                 36             1         2, 150            2, 150           935           44, 225. 70
   Clear Creek-Graysboro-                              45             1         1, 335               985           852           34, 330. 16
   Cape Girardeau, Mo_                                 49             1            660               552           330            7, 259. 76
   Giboney Island                                      50
   Little Flora-Swiftsure_      -                      57             2         4, 500            4, 480        2, 160          122, 879. 88
   Devils Island-Kinney Point-............             60                                       - -
   Hanging Dog Island                                  70
   Wittenberg, Mo__                                    82             1         4, 150            4, 185        1, 958           79, 058. 08
   Brunkhorst, Ill__                                   86             --                                                          - -
   Seventy-Six, Mo__                                   92             1          4, 875           3, 331        5.,668          171, 816. 64
   Liberty Bend, Ill_-                                 97             1          2, 345           1, 933        1, 162           54, 098. 04
   Liberty, Mo__                    -                  99-         ---..........        .                                  -
   Rockwood, Ill              -100                 100 - .          .-       .     .     .---                   :          -       ..-
   Kaskaskia Island _      ..                      1.3.
   Kaskaskia Island and Ste. Genevieve, Il1_       120
   Ellis Grove, Ill.-Ste. Genevieve, Mo            1.21             2           9, 000           9, 340         6, 717          320, 043. 91
   Establishment Island__      -                   129              1           9, 000           9, 356         6, 120          278, 791. 15
   Fort Chartres, Ill. and Mo-------------         131              2           1,165            1,114          1, 234           41, 865. 39
   Establishment-Sycamore-Harlow ......            135             21            2 535            2 614          2 133--
   Danby Landing-James Landing ........            141              1           4, 000           2, 955         1, 827           73, 225. 32
   Calico IslandlSulphur Springs .....             153
   Chesley Island-Pulltight_ - -                   161.               1         3, 385           3, 640         2, 533          113, 614. 08

     Total    __ _     -     -                                      24        59, 290           58. 852        43, 436 1, 879, 032. 01
New work     by   United   States plant   and
hired labor:
   Dogtooth Bend_______________________                22            1          1, 700           1, 735            801           34, 273. 14
   Sliding Towhead -. _ ...    -                       24            1          4, 080           3, 926         2, 799          133, 106. 62
   Cape Girardeau, Mo-             -                   49            1          2, 035           2, 034         1, 224           49. 223. 69
   Brunkhorst _---------------------------             85
               Mo-
   :Seventy-Six,                                       90   --             ----------
                                                                              __--------          ---------
                                                                                                   __-_-            377               72
                                                                                                                                13,078.
   Rockwood, Ill--                                 102               1             430                350           262          13, 073. 30
     Total_                                      _ _                 4          8, 245           8, 045         5, 463         242, 755. 47
   Maintenance by United States plant
    and hired labor ----------------------- I---                           ----------            4, 842        16, 970         472, 549. 82

1 Work completed during fiscal year 1933.
2 Cost included with dikes; as dikes were not built work listed as bank protection.


   The cost of new regulating work was $4,080,073.68,                                                                including
$3,823,219.81 for contract work; the cost of maintenance was
$1,659,616.53.
   The above new work included the following operations conducted
with allotment from the Federal Emergency Administration of
Public Works: 71 dikes totaling 46,425 feet in length were built
under contract at a cost of $1,324,926.68; 14 revetments totaling
45,830 feet in length, consisting of 44,173 squares of mattress and
31,056 squares of paving, were built under contract at a cost of
$1,363,612.86; and 2 revetments totaling 5,100 feet in length, con-
sisting of 5,485 squares of mattress and 2,209 squares of paving, were
built by hired labor with Government plant at a cost of $114,065.97,
all Public Works funds. The total cost, Public Works funds, was
$2,802,605.51, all new work. All projects for which funds were
allotted by the Public Works Administration were completed during
the fiscal year.
774      REPORT OF CHIEF OF ENGINEERS,                     U.   S.   ARMY,       1934


   The following maintenance Work was conducted with regular funds.
   The required 9-foot channel was maintained except for short
periods needed to move, a dredge to the shoal by 1 contract and 10
United States dredges. During the year 112 shoals developed, of
which 89 were dredged once, 22 were dredged twice, and 1 required
dredging three times. There were 17,980,633 cubic yards of sand
and gravel removed by United States dredges from 112 channels
through 89 bars, and 2,616,861 cubic yards of material removed in
outside-the-channel dredging. In addition 1,307,884 cubic yards of
material were dredged by contract from outside the channel. The
channels dredged had combined length of 65 miles, an average width
of 320 feet, and an average gain in depth of 4.4 feet. The total cost
of dredging was $933,157.25, including $108,372.04 for contract dredg-
ing, all charged to maintenance.
   During the year 17 wrecks and miscellaneous obstructions were
removed at a total cost of $71,798.79, charged to maintenance.
   Hydrographic surveys were made covering 333 miles of river.
The cost of surveys and gages was $95,375.72, charged to maintenance.
   The total cost of the work was $5,739,690.21, of which $1,277,468.17,
maintenance and improvement funds, and $2,802,605.51, Public
Works funds, a total of $4,080,073.68, was for new work, including
$3,823,219.81 for contract work; and $1,659,616.53, from maintenance
and improvement funds, was for maintenance, including dredging,
surveys, and removal of snags. The total expenditures were $5,725,-
543.35, of which $2,819,258.11 was from Public Works funds.
   Condition at end of fiscal year.-The regulating works are about 70
percent completed. The quantities required to complete the projects
are estimated as follows: 28 dikes, 77,700 linear feet, and 71 revet-
ments, 291,800 linear feet. All work is in very good repair and has
greatly improved the channel. Dredging is required at low stages to
remove temporary shoals and maintain the required channel depths.
   In recent years, notwithstanding the unusual low water that has
prevailed, the project dimensions of channels have generally been
maintained throughout the navigation season with only slight and
infrequent delays to navigation. The navigation season usually
lasts from the early part of February to the latter part of December,
the river being generally closed by ice the remainder of the year.
The river is usually above a 10-foot stage, St. Louis gage, for 6
months of the year, during which time the minimum channel depth
generally prevails without dredging.
   The total costs under the existing project to the end of the fis-
cal year are $28,224,409.61 (including $2,802,605.51 Public Works
funds), for new work and $17,057,793.29 for maintenance, including
dredging, surveys, and snagging, a total of $45,282,202.90. The total
expenditures on the existing project are $48,374,492.16, of which
$2,819,258.11 was from Public Works funds.
   Proposed operations.-The balance unexpended, including ac-
counts receivable at the end of the year, will be applied as follows:
Regular funds : Accounts payable June 30, 1934_______________ $103, 427.30
Maintenance :
   Dikes and revetments __________________--____-_--226, 500. 00
      Dredging _-         -      -          -        -___746,                           000.00
      Surveys, gages, and studies       .----------..-                           - 105, 000.00
      Balance remaining --             --                       -        -           2, 651. 06
        Total regular funds_--------------                                   -    1, 183, 578. 36
             RIVERS AND HARBORS-ST.                         LOUIS, MO., DISTRICT                           775
   Public Works funds.-The balance unexpended, $98,122.36, and
account receivable, $37,175.40, together with an allotment of $640,000,
made during July 1934, will be applied as follows:
New Work :
   By contract: Account payable June 30, 1934---- $20, 522. 80
   Piling dikes:
        Giboney Island, Ill--------------------------90, 00. 00
        Willard -----------------------------------   70, 000. 00
        Liberty, Mo., Crain Island-----------------  105, 000. 00
                                                                                                   $285, 522. 80
     Revetment:
         Hurricane Field-Boston Bar__----------------- 84, 000. 00
         Dogtooth Bend------------------------------96, 000. 00
         Giboney Island_____________---------------    56, 000. 00
         Cape Girardeau                                28, 000. 00
         Devils Island-----------------                60, 000. 00
         Grand Tower Island--------------------        56, 000.00
                                                                                                    380, 000. 00
     By United States plant and hired labor-Dikes:
        Danby Landing----------------------------                                    34, 000. 00
        Grain Island-----------------------------_                                   75, 000. 00
        Balance remaining ---------------------------                                    774.96
                                                                                                    109, 774. 96

            Total N. I. R. A. funds__                     _
                                   -------------------------                                        775, 297. 76
  The additional sum of $3,500,000 can be profitably expended dur-
ing the fiscal year ending June 30, 1936, as follows:
New work by contract :
   Dikes -----------------------------------------------------                                        $935, 000
   Revetments---_                                                                                    1, 265, 000

      Total new work-----------------------------------------     2,200, 000
Maintenance by'hired labor with United States plant:
   Dikes and revetments ----------------------------------------    345, 000
   Dredging ---------------------------------------------           780, 000
    Snagging                                                -----    65, 000
                                                                     6-----------------------
   Surveys, gages, and studies-----------------------------------110, 000
       Total   maintenance___            --------------------                                        1, 300, 000

       Total for all work, fiscal year 1936                     ---------------                      3, 500, 000

                             Cost and financial summary
                       MAINTENANCE AND IMPROVEMENT FUJNDS

Cost of new work to June 30, 1934         ---                              -------           $27, 031, 804. 10
Cost of maintenance to June 30, 1934_
                                    ----------------------                                    17, 057, 793. 29

      Total cost of permanent work to June 30, 1934----------                                 44, 089, 597. 39
Value of plant, materials, etc., on hand June 30, 1934-..  _....                               3, 054, 970. 43

      Net total cost to June 30, 1934_ ----------------------- 47, 144, 567. 82
Plus accounts receivable June 30, 1934------------------------     124, 093. 53

      Gross total costs to June 30, 1934-------------------                                   47, 268, 661.35
Minus accounts payable June 30, 1934---------------------_                                        103, 427. 30

     Net total expenditures---------------------------------                                  47, 165, 234. 05
Unexpended balance June 30, 1934__-------------------------                                    1, 059, 484. 83
       Total amount appropriated to June 30, 1934_                                            48, 224, 718. 88
776          REPORT OF CHIEF OF ENGINEERS, U.                                          S. ARMY,              1934


    Fiscal year ending June 30               1930              1931               1932               1933               1934


Cost of new work________________ $2, 029, 138. 39 $2, 238, 192. 43 $1, 008, 610. 87 $2, 354, 097. 86               $1, 277, 468. 17
Cost of maintenance_    -         1, 011, 136. 09    888, 250. 60 1, 120, 165. 37       951, 859. 78                 1, 659, 616. 53
      Total cost__----------------3, 040, 274. 48         3, 126, 443. 03    2, 128, 776. 24    3, 305, 957. 64     2, 937, 084. 70
Total expended ----------------- 2, 409, 153. 46          3, 400, 331. 60    2, 704, 331. 23    3, 599, 802. 51     2, 906, 285. 24
Allotted -----------------------       1,973, 396. 90     3, 218, 906. 65       269, 578. 67    5, 122, 994. 46     2, 243, 564. 23


Balance unexpended July 1, 1933_----------------------------
                                                _                                                            $1, 722, 205. 84
Amount allotted from War Department Appro-
  priation Act approved Apr. 26, 1934_________- _   $865, 600.                                        00
Amount allotted from War Department Appro-
  priation Act approved July 14, 1932___________     675, 027.                                        84
Amount allotted from War Department Appro-
  priation Act approved Feb. 23, 1931                370, 000.                                        00
Amount allotted from War Department Appro-
  priation Act approved Mar. 4, 1933                 660, 806.                                        50
                                                                                                              2, 571, 434. 34
     Amount to be accounted for ______________________----4, 293, 640. 18
Deductions on account of revocation of allotment (includes
 $140,409.97 impounded funds) ------------------------------ 327, 870. 11

       Net amount to be accounted for___-____ ___          _______                                            3, 965, 770. 07
Gross amount expended________________               $5,344, 247. 51
Less :
     Reimbursements collected __   $2, 423, 528. 16
     Receipts from sales __....         14, 434. 11
                                                     2, 437, 962.27         4                                 2, 906, 285. 24

      Balance unexpended June 30, 1934__ -----------------                                                    1, 059, 484. 83
Outstanding liabilities June 30, 1934______-----------                                                           255, 918. 20
      Balance available June 30, 1934______________--
                                                  -    -__--                                                    803, 566. 63
Accounts receivable June 30, 1934____   -________     ________-                                               -124, 093. 53
         Unobligated balance available June 30, 1934----__----927,                                                      660. 16
Amount (estimated) required to be appropriated for completion
of existing project 1_____-_____                             11, 585, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1936:
   For new work     -------------------------------------
                     --
                                                                                                              2, 200, 000. 00
   For maintenance 1________           _________                                                              1, 300,000. 00
                           - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
         Total 1                                                                                              3, 500, 000. 00
                                             PUBLIO WORKS FUNDS

Cost of new work to June 30, 1934 ____                              _________                  _______ $2, 802, 605. 51
Cost of maintenance to June 30, 1934

      Total cost of permanent work to June 30, 1934 _____   -_                                                2, 802, 605. 51
Plus accounts receivable June 30, 1934_______________________                                                     37, 175. 40
     Gross total costs to June 30, 1934 ____________________                                                  2, 839, 780. 91
Minus accounts payable June 30, 1934_________________-                                                            20, 522. 80
         Net total expenditures                         _____------__                               __--2,        819, 258. 11
Unexpended balance June 30, 1934-------                                                                            98, 122. 36
         Total amount appropriated to June 30, 193411                                                1        2, 917, 380. 47
   1Exclusive of available funds.
                RIVERS AND                    HARBORS-ST.                               LOUIS, MO.,                              DISTRICT                         777

   Fiscal year ending June 30                     1930                           1931                      1932                       1933                 1934


Cost of new work                 __--------------
                                              -------------------                                                                                    $2, 802, 605. 51
          W w----------
Cost of maintenancen                                              - I--------- -                    -------------                     --------      ----     --
Total expended                       -           ------------------ ---------------- ------------------                                                2,819, 258. 11

Allotted ---------------.-----                                                                                                                         2, 917, 380. 47



Amount allotted from National Industrial Recovery Act ap-
  proved June 16, 1933---------------------------------------     $2, 917, 380. 47
Gross amount expended         ----------         $2, 890, 443. 60
Less reimbursements collected ------------            71, 185. 49
                                                                   2, 819, 258. 11

     Balance unexpended June 30, 1934                                                                                                                 98, 122. 36
Amount covered by uncompleted contracts                                                                                                               20, 522. 80

          Balance available June 30. 1934                                                                        ---------                            77, 599. 56
Accounts receivable June 30, 1934-----------------------------                                                                                       37, 175. 40

     Unobligated balance available June 30, 1934_                                                                                                   114, 774. 96
Amount allotted by Public Works Administration Emergency
                                        _
   Appropriation Act, fiscal year 1935_----------                                                                        -----                      640, 000. 00

          Balance available for fiscal year 1935--                                                                                                  754, 774. 96

CONSOLIDATED          C'ST' AND              FINANCIAL                  SUMMARY                   FOR       MISSISSIPPI                    R.IER           ET'WEEN
                                               OHIO AND MISSOURI RIVERS

Cpst of new work to June 30, 1934__                                                                                                          $29, 834, 409. 61
Cost of maintenance to June 30, 1934_                                                                                                        17, 057, 793.29

      Total cost of permanent work to June 30, 1934 --------      46, 892, 202. 90
Value of plant, materials, etc., on hand June 30, 1934 ----------    , 054, 970. 4l

      Net total cost to June 30, 1934                                                       ------                                           49, 947, 173. 33'
Plus accounts receivable June 30, 1934__                                                                                                         161, 268. 93

     Gross total costs to June 30, 1934 --                                                  ---        -                                     50, 108, 442. 26
Minus accounts payable June 30, 1934....-                                                                                                        123, 950. 10

         Net total expenditures____                                                                                                          49, 984, 492. 16
Unexpended balance June 30, 1934                                        -          -                             ------                          1, 157, 607. 19

         Total amount appropriated to June 30, 1934                                                                          __              51,142, 099. 35

   Fiscal year ending June 30                     1930                           1931                      1932                       1933                 1934


Cost of new work--...                        $2,029,138. 39 $2, 238, 192. 43 $1, 008, 610. 87 $2, 3544, 097. 86                                      $4, 080, 073. 68
Cost of maintenance____                      1,011,136. 09                    888, 250. 60          1, 120,165. 37                 9511, 859. 78       1, 659, 616. 53
                                                          -----     1I-----             -     I -      -     -       -


      Total cost _-                          3, 040, 274. 49                3, 126, 443. 03         2, 128, 776. 24              3, 3055, 957. 64     5, 739, 690. 21
Total expended--__                           2, 409,153. 46                 3, 400, 331. 60         2, 704, 331. 23              3, 599), 802. 51     5, 725, 543. 35
                 - - -
Allotted____________                          1, 973,396.90                 3, 218, 906. 65           269, 578. 67               5, 1212, 994. 46     5, 160, 944. 70
                                         I                          I                         I


Balance unexpended July 1, 1933_________________                                                                          __-____-_          $1, 722, 205. 84
Amount allotted from War Department Appropri-
  ation Act approved Apr. 26, 1934__                                                                             $865, 600. 00
Amount allotted from War Department Appropri-
  ation Act approved July 14, 1932_                                                                                675, 027. 84
Amount allotted from War Department Appropri-
ation Act approved Feb. 23, 1931_--                                                                               370, 000. 00
778        REPORT OF CHIEF OF ENGINEERS,                       U.     S.    ARMY,      1934

Amount allotted from War Department Appropri-
ation Act approved Mar. 4, 1933______________                      $660, 806. 50
Amount allotted from National Industrial Recov-
ery Act approved June 16, 1933---------------                      2, 917, 380. 47
                                                                                       $5,488, 814. 81

      Amount to be accounted for                  _                                     7, 211, 020. 65
Deductions on account of revocation              of allotment              (inc!udes
 $140,409.97 impounded funds)    -                                                         327, 870. 11

         Net amount to be accounted for-                                                6, 883,150. 54
Gross amount expended_____________________                      $8, 234, 691. 11
Less:
    Reimbursements collected                $2, 494, 713. 65
      R: ceipts from sales _---       ---        14, 434. 11
                                                                    2, 5049, 147. 76
                                                                                        5, 725, 543. 35
      Balance unexpended June 30. 1934                                                  1, 157, 607. 19
Outstanding liabilities June 30, 1934_                               $255, 918. 20
Amount covered by uncompleted conracts ......                          20, 522. 80
                                                                                           276, 441. 00

     Balance available June 30, 1934                                                       881, 166. 9
Accounts receivable June 30, 1934____________________________                              161, 268. 93

     Unobligated balance available June 30, 1934-                                       1, 042, 435. 12
Amount allotted by Public Works Administration Emergency Ap-
propriation Act, fiscal year 1935_________                                                640, 000. 00
         Balance available for fiscal year 1935_                                        1, 082, 435. 12

Amount (estimated) required to be appropriated for completion
  of existing project     1                                                            11, 585, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1936:
      For new work 1                                                                    2, 200, 000. 00
      For maintenance 1                                ---                              1, 300, 000. 00
         TotalK                       --                                                3, 500, 000. 00

2. MISSISSIPPI RIVER BETWEEN MOUTH OF MISSOURI RIVER AND
                      CLARKSVILLE, MO.

See report, "Mississippi River between the Missouri River and
Minneapolis, Minn.", page 783.
                3. MISSOURI RIVER, HERMANN TO THE MOUTH

  See report, " Missouri River, Kansas City to the mouth ", page 823.
4. REMOVING SNAGS AND WRECKS FROM THE MISSISSIPPI RIVER
     BELOW THE MOUTH OF MISSOURI RIVER AND FROM OLD AND
     ATCHAFALAYA RIVERS

  The section of the Mississippi River covered in this report was
formerly in charge of the St. Louis engineer district, but for the
purpose of administration on July 1, 1930, it was divided into three
reaches, which are under the supervision and direction of the district
engineers at St. Louis, Mo., Memphis, Tenn., and Vicksburg, Miss.
  L   Exclusive of available funds.
          RIVERS AND IARBORS-ST.      LOUIS, MO.,   DISTRICT      779
   The St. Louis district extends from the mouth of the Missouri
River to the mouth of the Ohio River, a distance of 195 miles. Thee
Memphis district extends from the mouth of the Ohio River to the,
mouth of the Arkansas River, a distance of 398 miles. The Vicks-
burg district extends from the mouth of the Arkansas River to the
Head of the Passes, 671 miles, and includes 8 miles of Old River
and 30 miles of the Atchafalaya River.
   District engineers: St. Louis, Mo., Maj. William A. Snow, Corps
of Engineers to December 1, 1933; Capt. Bartley M. Harloe, Corps
of Engineers, since that date; Memphis, Tenn., Maj. W. M. Hoge,
Corps of Engineers; Vicksburg, Miss., Maj. Lunsford E. Oliver,
Corps of Engineers.
   Division engineers: For the river below the mouth of the Ohio,
Brig. Gen. H. B. Ferguson, Corps of Engineers; for the river above
the mouth of the Ohio, Col. George R. Spalding, Corps of Engineers,
to November 27, 1933, and Lt. Col. Edmund L. Daley, Corps of
Engineers, since that date. Lt. Col. R. C. Moore, Corps of Engi-
neers, was acting Division Engineer, July 1 to 28, 1933.
   Location.-The snagging district embraces that portion. of the
river between Head of Passes and the mouth of Missouri River,
1,260 miles, 8 miles of Old River (present mouth of Red River),
and 30 miles of Atchafalaya River from Red River to Melville, La.;
total, 1,295 miles.
   Previous projects.--For the removal of these obstructions general
appropriations were made at irregular intervals as early as 1824.
The amount expended prior to 1879, when the first definite allot-
ment was made for the work, was approximately $358,627.35. For
further details, see page 1880, Annual Report for 1915.
   Existing project.-This is a continuation of the plan adopted in
1879, and provides for the removal and destruction of snags, wrecks,
drift heaps, and other obstructions to navigation in the Mississippi
River between Head of Passes (13 miles from mouth of South Pass)
and mouth of Missouri River, and in Old and Atchafalaya Rivers
 (38 miles) to Melville, La.; also for the felling of large trees on or
near caving banks, thereby decreasing the number of snags to be
destroyed thereafter.
   The work is done by the Department's steel-hull snagboats, J. N.
Macomb, built in 1874; H. G. Wright, built in 1881; C. B. Reese,
built in 1879 (rebuilt 1901) ; and the C. W. Howell, built in 1881; all
fitted with the necessary equipment and appliances and operated by
Government employees.
   Annual appropriations or allotments were made for this work
1879 to 1886, inclusive, except in 1883 and 1885. A continuous an-
nual expenditure of $100,000, or as much thereof as might be neces-
sary for the maintenance of this service, was authorized by section
7 of the River and Harbor Act of August 11, 1888, and has been
available each year to the present time. In addition thereto, and to
cover costs greatly increased by war conditions, an appropriation of
$50,000 was made in the River and Harbor Act of March 2, 1919,
and allotments of $25,000, $20,000, $17,500, and $13,000 were made
from War Department Appropriation Acts of June 30, 1922, Marchi
2, 1923, June 7, 1924, and April 15, 1926, respectively.
780      REPORT OF CHIEF OF ENGINEERS,               U. S.   ARMY,    1934

    No modification of the project has been made since its adoption
except that the River and Harbor Act of March 3, 1909, included the
Atchafalaya and Old Rivers from their junction with the Missis-
sippi and Red Rivers to Melville, La., in the district to be served.
    Terminal facilities.-Forinformation under this heading reference
should be made to the report on improving the Mississippi River
between Ohio and Illinois Rivers and to reports of the Mississippi
River Commission and district engineers thereunder.
    Operations and results during fiscal year.-The entire section of
river included in the project was patrolled and cleared of obstruc-
tions, except from Warrenton to Head of Passes, 454 miles, where
work was not required.
    Mouth of Missouri River to mouth of Ohio River (St. Louis dis-
trict).-The work in this district was done with maintenance funds
of the district and is reported under project, " Mississippi River be-
tween the Ohio and Missouri Rivers."
    Mouth of Ohio River to mouth of White River (Memphis dis-
trict).-During the year 2,571 miles were run, 726 snags destroyed,
42 stumps removed, 1 drift heap destroyed, and 2 trees cut, at a total
cost and expenditure of $26,614.50.
   Milouth of White River to Head of Passes and Old and Atchafalaya
Rivers (Vicksburg! district).-Ten complete trips were made be-
tween the mouth of White River and Warrenton, Miss. No snag-
ging was necessary below that point. During these trips, 2,500 miles
were run and 514 snags were destroyed, at a total cost and expendi-
ture of $23,385.50.
    The total cost of all work for the year was $50,000 and the total
expenditure $62,865.03.
    Condition at end of fiscal year.-The project being one of con-
tinuous maintenance of channel, no estimate of completion and total
cost can be made. Each freshet brings down new obstructions and
changes in location of channel, which are constantly going on, un-
cover old obstructions. The number of obstructions destroyed annu-
ally varies from several hundred to several thousand. (Anual Re-
port, 1920, p. 2503.)
    This work is of great benefit to commerce and navigation of the
river, and disasters caused by vessels striking channel obstructions
seldom occur.
    Operations in the various districts provided a channel reasonably
free from snags at the end of the fiscal year, and there is sufficient
plant available to take care of future work.
   The total cost of the existing project at the end of the fiscal year
was $4,781,537.82. The total expenditures under the existing project
were $4,818,547.48, of which $4,062,672.75 was from appropriation
provided under section 7 of the act of August 11, 1888.
    Proposed operations.-This work is continuous, since new obstruc-
tions are brought down by each freshet. The funds unexpended,
consisting of an appropriation of $96,500, provided under the act of
August 11, 1888, will be applied to work in the following districts:
St. Louis district-------------             ------------------------------    $46, 500
Memphis district     -------------------------               --------------    25, 000
Vicksburg district__                                                           2---------------------
                                                                               25, 000
                                                                               96, 500
                 RIVERS AND HARBORS-ST. LOUIS, MO., DISTRICT                                                          781
The work will be done by hired labor with Government plant.
  For the fiscal year 1936 it is believed that the sum of $98,200 can
be profitably expended.
                                         Cost and fnancial sumvmnary

Cost of maintenance to June 30, 1934------------     _- ____     _ $5, 140, 165. 17
Value of plant, materials, etc., on hand June 30, 1934 _________        37, 009. 66
     Net total expenditures___________________________                                                5, 177, 174. 83
Unexpended balance June 30, 1934__                                                              _         11, 536. 04

          Total amount appropriated to June 30, 1934_____________                                     5, 188, 710.87

          Fiscal year ending June 30                   1930          1931          1932          1.933              1934


Cost of new work ..                          --   ----- 9.---
                                                 $9        ----- ----      --- , ---- - -$8-0-.
                                                                           --                                  -    ----
Cost of maintenance--              ------------- $89, 009. 50 $88, 632. 19 $97, 494. 01 $88, 086. 08            $50, 000. 00
Total expended--_----------           ---------      90, 347. 26   61, 996. 78   78, 295. 48   79, 651. 07         62, 865. 03
Allotted .............----------------------------   99, 980. 89   81, 506. 24   85, 502. 05   52, 556. 41         43, 465. 13


Balance unexpended July 1, 1933------------------------------- $30, 935.94
Amount allotted from War Department Appropriation Act approved
  Aug. 11, 1888    -------------------------------------------  51, 614. 50
      Amount to be accounted for___________________------__                                                  82, 550. 44
Deductions on account of revocation of allotment (includes $387.92
  impounded funds) -------          ----------------------                                                    8, 149. 37

      Net amount to be accounted for - -,         ------                                                     74, 401. 07
Gross amount expended___--------_____                 $63, 730. 11
Less reimbursements collected------------------------      865. 08
                                                                                                             62, 865. 03

          Balance unexpended June 30, 1934__---                          ___-__--___-__                      11, 536. 04

Amount that can be profitably expended   in fiscal year ending June
                             -- --- ----
30, 1936, for maintenance 1________________                                                                 98, 200. 00

    5. EXAMINATIONS, SURVEYS, AND CONTINGENCIES (GENERAL)

   The cost of the work during the year was $82,566.68; and the ex-
penditures were $85,000. The balance unexpended June 30, 1934,
$18,766.33, will be applied as needed during the fiscal year 1935 to
payment of expenses incurred in connection with the above items.
The additional sum of $30,000 can be profitably expended during the
fiscal year ending June 30, 1936.
                                         Cost and financial summary

Cost of maintenance to June 30, 1934_______ ________-----                                                $174, 523. 76
Value of plant, materials, etc., on hand June 30, 1934_______                                  ____         2, 933. 32

          Net total cost to June 30, 1934___ --------------
                                                __---                                                     177, 457. 08

Net total expenditures _____---------------------                                                        177, 457. 08
TJnexpended balance June 30, 1934__________________-_______                                               18, 766. 33

          Total amount appropriated to June 30, 1934 ..                                                   196, 223. 41

  1 Exclusive of available funds.
782         REPORT            OF        CHIEF OF ENGINEERS,                               U.     S. ARIMY,           1934


          Fiscal year ending June 30                              1930             1931            1932            1933            1934

Cost ofnew work__--------------------                                                                                                  -
Cost of maintenance------------------                        $8, 774. 80         $7, 168. 39     $6, 903. 55   $60, 457. 08      $82, 566. 68
Total expended.     -----------------------                      8, 282. 01       7, 462. 14      7, 552.96      61, 018. 06      85, 000. 00
Allotted-----------------------------9, 000. 00                                   7, 500. 00   -----------     131, 443. 98       33, 279. 43


Balance unexpended July 1, 1933------------------------              $70, 486. 90
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934---------------------       $15, 000. 00
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933---------------------         20, 000.00
                                                                      35, 000. 00
     Amount to be accounted for ___-____-    ----        -     -                                                          105, 486. 90
Deductions on account of impounded funds revoked -------------                                                              1, 720. 57

      Net amount to be accounted for -----------------------                                                               103, 766.33
Gross amount expended-__----------- --------                                                                                85, 000. 00
          Balance unexpended June 30, 1934_ ..........                                              .____-__                   18, 766.33

Amount that can be profitably expended in fiscal year ending June
                               - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 30, 000. 00
30, 1936, for maintenance 1

                  6. Other projects for which no estimates are submitted
                                [For last full report see annual report for 1933, p. 1301]

                                                                                                          Cost and expenditures to
                                                                                                                June 30, 1934
                                    Name of project
                                                                                                       New work           Maintenance

Experimental Towboat Board 1                  .......---------                          ..------
                                                                              .........------             $416, 386. 58          $23, 241. 97

1 Work during fiscal year 1934 consisted of routine studies, no expenditures being involved.

   Balance unexpended June 30, 1934, $60,371.45.

MISSISSIPPI RIVER BETWEEN THE MISSOURI RIVER
            AND MINNEAPOLIS, MINN.

   The section of the river covered in this report is divided into three
reaches under the supervision and direction of district engineers at
St. Louis, Mo., Rock Island, Ill., and St. Paul, Minn.
   The section in the St. Louis district extends from the mouth of
the Missouri River to Clarksville, Mo., a distance of 78 miles; the
Rock Island district extends from Clarksville, Mo., to the mouth of
the Wisconsin River, a distance of 358 miles; and the St. Paul dis-
trict extends from the mouth of the Wisconsin River to and includ-
ing theharbor of Minneapolis, Minn., a distance of 222 miles.
   District engineers: At St. Paul, Minn., Major Dwight F. Johns,
Corps of Engineers; at Rock Island, Ill., Lt. Col. Glen E. Edgerton,
Corps of Engineers, to August 31, 1933, and Capt. John M. Silkman,
Corps of Engineers, acting district engineer, to September 22, 1933,
  1
      Exclusive of available funds.
              RIVERS       AND H[ARBORS-UPPER                                 MISSISSIPPI RIVER                       783
and Maj. Raymond A. Wheeler, Corps of Engineers, since that
date; at St. Louis, Mo., Maj. William A. Snow, Corps of Engineers,
to December 1, 1933, and Capt. Bartley M. Harloe, Corps of Engi-
neers, since that date.
  Division engineer: Col. George R. Spalding, Corps of Engineers,
to November 27, 1933, and Lt. Col. Edmund L. Daley, Corps of
Engineers, since that date. Maj. William A. Snow, Corps of Engi-
neers, assistant to division engineer, since December 1, 1933. Lt.
Col. R. C. Moore, Corps of Engineers, was acting division engineer,
July 1, 1933, to July 28, 1933.
                                                 IMPROVEMENTS

                                                    Page                                                              Page
1. Mississippi River between                                       2. Operating and care of locks
    the Missouri River and                                             and dams----------                               803
    Minneapolis, Minn --------                        783

      1. MISSISSIPPI RIVER BETWEEN THE MISSOURI RIVER AND
                                       MINNEAPOLIS, MINN.

   Location.-The Mississippi River rises in the northern part of
Minnesota. It flows in a southerly direction and empties into the
Gulf of Mexico. The portion included in this report extends from
the mouth of the Missouri River, to and including the harbor of
Minneapolis, Minn., a distance of 658 miles.
   Previous projects.-Adopted by the acts of June 10, 1872; June
18, 1878; August 18, 1894; February 9, 1905; March 3, 1905; March
2, 1907; June 25, 1910; September 22, 1922; March 3, 1925; January
21, 1927, and July 3, 1930. The costs on the different projects prior
to the commencement of work on the existing project were as
follows :

                                                                                           New work          Maintenance

Between Missouri River and Clarksville, Mo..-------.....-----------------                 $4, 987, 452. 91   $1, 705, 886. 00
Between Clarksville, Mo., and Wisconsin River                         -     -----------   29, 189, 537. 01    1, 317, 928. 11
Wisconsin River to Minneapolis         ----------------------------------                 14, 380, 626. 04       742, 836. 19

     Total..----------------------------      ---------------------------------           48, 557, 615. 96    3, 766, 650. 30



   Total, new work and maintenance, $52,324,266.26.
  In addition, an amount of $2,482,996.41 was expended for plant,
materials, and stock used on the existing project, making the total
expenditures $54,807,262.67.
  For further details see pages 1879, 1880, and 1887 of the Annual
Report for 1915, and pages 1106, 1107, and 1108 of the Annual Report
for 1932.
  Existing project.--This project, which provides for channel depths
of 9 feet, with suitable widths to be obtained by open channel work
and locks and dams, was adopted by an item in the River and Harbor
Act of July 3, 1930, amended by Public Resolution No. 10, Seventy.


       91536--ENG 1934            50
784     REPORT OF CHIEF        OF ENGINEERS,     U.   S. ARMY,   1934

second Congress, first session, approved February 24, 1932, to read
as follows:
  The existing project is hereby modified so as to provide a channel depth of
9 feet at low water with widths suitable for long-haul common-carrier service,
to be prosecuted in accordance with the plan for a comprehensive project to
procure a channel of 9-foot depth, submitted in House Document No. 290,
Seventy-first Congress, second session, or such modification thereof as in the
discretion of the Chief of Engineers may be advisable; and the sum of
$7,500,000, in addition to the amounts authorized under existing projects is
hereby authorized to be appropriated for the prosecution of initial works under
the modified project: Provided, That all locks below the Twin City Dam shall
be of not less than the Ohio River standard dimensions.
   The amounts authorized under the then existing projects, on July
3, 1930, were $6,270,000, thereby limiting the amount authorized by
law for the prosecution of initial works to $13,770,000. Additional
funds amounting to $50,500,000 were allotted by the Federal Emer-
gency Administration of Public Works.
   The latest map and profile published showing this section of the
river have been inserted between pages 20 and 21 of House Document
No. 137, Seventy-second Congress, first session. A map of the sec-
tion, Minneapolis to Lake Pepin, is published in House Document No.
583, Sixty-ninth Congress, second session. The latest published maps
of the locality at Moline are in House Document No. 397, Fifty-eighth
Congress, second session, and House Document No. 263, Sixty-ninth
Congress, first session.
   Pertinent data for existing and proposed locks and dams are given
in the following table:
                                              LocaionLoc
                                              Location                                                        Lock
                                                                       I
                                                                                               -
                                                                                                                                                                                                         Estimated
                                                                                                                                                                                                        cost of each
                                                                                Dimensions                     Depth on                                                                        Year      lock and
                               Miles                                                                           miter sill                                                             Per-                dam in-
                               below                                                                                                                     Character of dam             cent-   opened      cluding
          Name                 N. P.      Distance from nearest town                                                                                                                   age      to
                                                                                                                                                           foundation                 com-    navi-       flowage
                                 Ry.       or mouth of navigable Width Greatest                                                      Character of                                                        damages               gj
                               bridge,     tributary                                                                                 foundation                                      pleted   gation       under
                                                                      of length                                        Lower
                               Minne-                                      cham- available    Lift        1   Up-                                                                                         existing             TR
                                apolis                                      chaer- for full                   per       ()
                                                                                                                                                                                                          project 2
                                                                                                                                                                                                                           May




                                                                                    width

                                                                                                                                                                                                                           (12
                                                                           Feet      Feet     Feet            Feet      Feet
                                          6.2 miles above Omaha
Twin City Lock and Dam-            5.4       R. R. bridge, St Paul,            56
                                                                               56
                                                                                       400
                                                                                        400
                                                                                              33. 9
                                                                                              33.9
                                                                                                              12. 5
                                                                                                              13.5
                                                                                                                         9. 5
                                                                                                                        12. 0
                                                                                                                                 Sandstone a n d
                                                                                                                                  piles in gravel.
                                                                                                                                                         Gravel, boulder, !
                                                                                                                                                          and sandstone. J
                                                                                                                                                                                        100    1917    3,12$1,000,539.26   I
                                             Minn.
                                          1.3 miles above Hastings,           110       500        14. 1      17. 5     14. 7
Hastings Lock and Dam__           37. 8      Mini.                          5 110     5 500   5 14.1                   514.7    }Pilesin sand-       Piles in sand __     6 100                1930    4 3, 809, 000. 00
Lock and Dam No. 3___             56. 1   6.1 miles above Red Wing,
                                             Minn.
                                                                              110       600        8.0        17. 0     14.0    Piles in sand, silt, Piles in sand, silt,
                                                                                                                                  and clay.            and clay.
                                                                                                                                                                                     -------.6, 128, 000. 00               d




Lock and Dam No. 4__ -__         100. 2   0.6 mile above Alma, Wis__          110       600        7.0        17. 0     13. 0 Piles in sand and Piles in sand and         7 100                          4, 331, 000. 00
                                                                                                                                  gravel.              gravel.             840
Lock -a d Dam No. 5_....         114. 9 5.1 miles ,agboveFountain             110       600        9.0        18. 0     12. 0 ---_ do ...........        do ----------- 7 100                            4, 796, 000. 00
                                           City, Wis.                                                                                                                                  848                                 ci
Lock and Dam No. 5A .__          124. 5 3.0 miles above Winona,               110       600         5.5       18. 0     12. 5    Piles in silt, sand,     Piles in silt, sand,         7 40              4, 842, 000. 00
                                                                                                                                                                                                                               It
                                           Minn.                                                                                   and gravel.               and gravel.                                                   (12
Lock and Dam No. 6    ------     138. 7 0.2 mile below Trempea-               110       600         6. 5      17.0      12. 5 -- - do _..... --         ----- do---- --- - -           7 44              5, 445,000 00
                                           leau, Wis.                                                                                                                                                                          H
Lock and Dam No. 7 -...          150. 5 4.6 miles above La Crosse,            110       600         8.0        18. 0    12.0     Piles  in   sand,       Piles in sand and             7 22              5, 785, 000. 00
                                           Wis.                                                                                    gravel, and             gravel.                                                             n
                                                                                                                                   broken rock.                                                                            (12
Lock and Dam No. 8 .--           173.8    0.4 mile below Genoa, Wis_          110       600        11. 0       22. 0    14. 0 -- do ---
                                                                                                                                     -          -        ___do.----        ...   .     7 29              7, 220, 000. 00   w
                                                                                                                                                                                                                               n
Lock and Dam No. 9 ....          205. 1   3.3 miles below Lynxville,          110       600         9. (       16. 0    13.0 -___do                     ____do__                       7 17              7, 436, 000. 00   (12
                                             Wis.                                                                                                                                                                          (12
Lock and Dam No. 10 ....         238. 0   Guttenberg, Iowa_ . ...             110       600         8.0        15.0     12.0     Piles in sand and ----- do- ..       ..    ..   .     7 18              5, 488, 000. 00
                                                                                                                                   gravel.                                                                                     H
Lock and Dam No. 11__ __         270. O0 3.7 miles above Dubuque,             110       600        11. 0       18. 5    12. 5 ----   do -_--       ---- do __                          7 18              5, 776, 000. 00
                                            Iowa.                                                                                                                                                                              4-
Lock and Dam No. 12 .____        296. 1   0.6 mile below Bellevue,            110       600         9.0        17. 0    13.0     Rock, piles in sand     Piles in sand-.---_           7 13              5, 494,  00
                                                                                                                                                                                                               000.
                                            Iowa.                                                                                 and gravel.                                                                                  O
    1 Lifts, and depths on miter sills, based on completion of all locks and dams.
    2 Total estimated flowage damages, $13,749,000.
    3 In addition, $1,948,772.95 was expended from previous projects and $1,349,557.78 from operating and care appropriation for reconstruction of first of twin locks.
    4 In addition, $1,965,316.22 was expended from previous projects. Includes $1,500,000 for auxiliary lock.
    5 Proposed auxiliary lock.
    6 Not including second lock and land-flowage acquisition.
    7 Lock.
    8 Dam.
                                                                  o oI
                                                                 Location
                                                                                                                                                                              I                            I            I             I
                                                                                                                                      Lock
                                                                                           i
                                                                                                                                                                                                                                        Estimated
                                                                                                                                                                                                                                       cost of each
                                                                                                                                       Depth on                                                                                         lock and
                                             Miles                                                      Dimensions                     miter sill                                                                Per-        Year        dam in-
                                             below                                                                                                                                 Character of dam             cent-       opened
                Name                                                                                                                                                                                             age          to         cluding
                                             N. P.       Distance from nearest town                                                                                                    IULlu        1
                                                                                                                                                                                                 bUIUL                                   flowage
                                                                                                                                                          Character of                                          com-         navi-
                                              Ry.         or mouth of navigable                Width       Greatest                                                                                                                     damages
                                            bridge,       tributary                                                                                        foundation                                          pleted       gation
                                                                                                                                                                                                                                          under
                                                                                                                                                                                                                                                             0
                                            Minne-                                               of         length              i     STT,
                                                                                                                                      Up- Lower
                                                                                               cham-       available   Lift 1        per 1                                                                                               existing
                                                                                                                                            (1)
                                             apolis                                                         for full                                                                                                                     project 2           H
                                                                                                ber
                                                                                                            width
                                                                                                                                                                                                                                                             0

                                                                                                Feet         Feet      Feet          Feet     Feet                                                                                                           0
Lock and Dam No. 13 -_--                     330. 5       2.4 miles above Fulton,                 110           600    11.0          19. 0    13. 0    Piles in       sand,       Piles in sand and                                      760, 000.
                                                                                                                                                                                                                                       $5,       00          0
                                                            Iowa.                                                                                       clay, and gravel.          gravel.
Lock and Dam No. 14 --__                     359. 7       3.7 miles below Le Claire,              110           600     11.0          20.5     13. 5   Rock ..-------             Rock     ----                                           5, 783, 000. 00
                                                            Iowa.
Le Claire Lock (Canal)___                    359. 9       3.9 miles below Le Claire,
                                                            Iowa.
                                                                                                      80        320     11.0          17. 8    10. 8                                                              100         1922              (I)          Q
Moline Lock -----------                      367. 9        --     - - - - - -- - - - - -                                                                                                                                      1907              (10)
                                                         Foot of Arsenal Island         110ii                   600    16.0           27. 0    11. 0 Rock -
Lock and Dam No. 15 -.
Lock and Dam No. 16 -- -
                                             370. 3
                                             396. 0
                                                            Rock Island Ill.,
                                                         1.6 miles above Muscatine,
                                                                                      11110
                                                                                         110
                                                                                                              11360 1116.0
                                                                                                                600     9.0
                                                                                                                                    11 27. 0 1111.
                                                                                                                                      17.0     12.0
                                                                                                                                                    0                        Rock- ---
                                                                                                                                                      Piles in sand and Piles in sand and
                                                                                                                                                                                                                  100         1933    12 6,   418, 351. 62
                                                                                                                                                                                                                                          5, 492, 000.00
                                                                                                                                                                                                                                                             z
                                                                                                                                                                                                                 7 48
                                                            Iowa.                                                                                       clay.                  gravel.
Lock and Dam No. 17 ---                      416. 0      3.3 miles above mouth           110                    600     8.0           16. 0    13.0   Piles in sand and ----- do----  .   .                                               5, 366, 000. 00
                                                            Iowa River.                                                                                 gravel.
Lock and Dam No. 18...__                     442. 5      6.5 miles above Burlington,     110                    600     9.8           16.5     13.7 Piles in sand, gray- _..do.--------                          7 28                     5, 207, 000. 00
                                                            Iowa.                                                                                       el, and clay.                                                                                        T32
Lock and Dam No. 19                                                                      110                     358}382
 (Keokuk).                              }    488.8       Keokuk, Iowa _............
                                                                                       i 110                   2 600
                                                                                                                                      14. 0     9.2 Rock-..........--        Rock.---------                       100         1913 131, 928, 000. 00
                                                                                                                                                             piles in
                                                                                                                                                         Rock,           dfPiles in sand,g ,rav-                7 100                                        Co
Lock and Dam No. 20_.. _                     509. 7      1.0 mile above Canton, Mo_      110                     600 10.0             15.0     12.0   Rock,ppiles          in sandel,
                                                                                                                                                                                   and clay.                     s 22       .......       4, 929, 000. 00
Lock and Dam No. 21- ...                     528. 1      2.1 miles below Quincy, Ill_    110                     600 10.5             16. 5    12. O0 Piles in sand.----     Detailed    sur vey                 7 36                     5, 397, 000. 00    rd

                                                                                                                                                                                  not made.
Lock and Dam No. 22__..                      551.9       7.9 miles below Hannibal,                110           600    10.5           18.0     13. 5 Rock -     -     -  -      -do ------- .....                716                      4, 968, 000. 00    wo

                                                            Mo.
Lock and Dam No. 23 .____                    574. 4      4.2 miles below Louisiana,               110           600    11.5           18.0                  --
                                                                                                                                               12. 5 ..... do    -- -- -- -        - . do -...........                                    5, 374, 000. 00
                                                            Mo.                                                                                                                                                                                              w~


Lock and Dam No. 24 .-.                      597. 8      3.2 miles below Hamburg,                 110           600     7.5           17. O0 14. 5     Detailed survey            .....d o    .--- -- --                                  7, 040, 000. 00
                                                            Ill.                                                                                        not made.
Look and Dam No. 25..                        612. 7      1.1 miles below Cap Au                   110           600    11.0           18. 0    13.0       do _...... ...          .....do .     .---------                                6, 020, 000. 00
                                                            Gris, Mo.
                                                                                                  110            600 20.0     34. 0 1114.0
                                                                                                                                      14.0 }Piles in sand.. -
Lock and Dam No. 26 ....                     650. 2      Alton, Ill------------------          11 110          i360 1120. 0 11ii
                                                                                                              11              16. 0                         -                 - _--.do .-.--.......              715                   10, 065, 000. 00


Total   locks   and   dams-----------------------------------------____^                                                       Total................              locks.....and....dams.........-.-$147, 297, 890.88
                                                                                   Additional features entering into cost of project
Dredging and regulating works                                            ---                                                        -                                                $1, 155, 000. 00
Pool 15, earth levee and rock excavation.           ..--------------------                                                                   -   -   -       -       -   -               400, 000. 00
Pool 16, rock excavation in vicinity of Horse Island_______________________________                                                                                                      400, 000. 00
Henderson River diversion, natural mouth in pool 18, to be diverted into pool 19_________________________________ ______________________________________________                         250, 000. 00
Examinations, surveys, engineering, and design --                         ..      _....                         .   .   .       ..----------------                                       497, 109.12
        Total additional features .--                       -        -         -                -__---             --     -    --       --               -       -           _   -     2, 702, 109. 12
        Total existing project .____________________________         _--                                                                                                             150, 000, 000. 00

    1 Lifts and depths on miter sills, based on completion of all locks and dams.
    6 Proposed auxilary lock.
    7 Lock.
    B   Dam.
    9 Existing Le Claire Lock will be used as auxiliary to Lock No. 14, previous project costs, $540,000.
    10 Abandoned subsequent to completion of Lock and Dam No. 15, previous project costs, $198,763.
    11Auxiliary lock.
    12Actual cost.
    13 In addition, cost of $640,868, for first lock, was reported by the Mississippi River Power Co., transferred to Government free in lieu of improvements destroyed (A. R. 1928,
pp. 1118-1119).




                                                                                                                                                                                                         Ci
788    REPORT OF CHIEF OF ENGINEERS,          U.   S. ARMY,   1934


   The estimate, according to the final report of the special board,
for the completion of the comprehensive 9-foot project between Illi-
nois River and Minneapolis, Minn., is $124,006,139, but Congress lim-
ited the appropriation of funds for work on the project to $7,500,000
in addition to the amounts authorized under existing projects, which
the board found to be $6,035,000. In addition, the sum of $220,000
was authorized for a change in Hastings Dam and $15,000 for certain
dredging in Minneapolis Harbor-altogether totaling $13,770,000,
and in maintaining the existing channel for navigation at an esti-
mated annual cost of $1,000,000.
   The estimate of cost for new work, revised in 1934, is $150,000,000,
exclusive of amounts expended on previous projects. The estimated
cost for annual maintenance is $1,000,000.
   Recommended modifications of project.-Under date of December
9, 1931, the Chief of Engineers recommended that the project for the
improvement of the upper Mississippi River from the mouth of the
Missouri to Minneapolis provide a channel of 9 feet depth and of
adequate width between the mouth of the Missouri and the Northern
Pacific Railroad bridge at Minneapolis, Minn., by the construction of
a system of locks and dams, supplemented by dredging in accordance
with plans prepared under the direction of the Chief of Engineers,
at a total estimated cost of $124,000,000, and also recommended the
authorization of the appropriation of the entire sum required for the
completion of the project (H. Doc. No. 137, 72d Cong., 1st sess.).
   Local cooperation.-Fully complied with.
   Terminal facilities.-A complete list of terminals available to the
public on the Mississippi River between the mouth of the Ohio River
and Minneapolis, Minn., as of January 1, 1933, can be obtained
from the division engineer, Upper Mississippi Valley Division,
St. Louis, Mo.
             OPERATION AND RESULTS   DURING    FISCAL YEAR


   Mouth of Wisconsin River to Minneapolis, Minn. (St. Paul dis-
trict)-Regular funds.-Maintenance channel dredging was done at
103 localities, by contract and by hired labor with use of Government
and rented plant, the lengths of cuts aggregating 42.28 miles. A total
of 2,911,857 cubic yards of sand, gravel, and rock was removed,
2,711,983 cubic yards being removed by hired labor and 199,874 cubic
yards by contract. The cost of dredging during the fiscal year was
$375,965.95.
   Land and flowage acquisition.-Payments were made into court
for all lands in the third and fourth condemnations for Hastings Lock
and Dam (No. 2). Condemnation proceedings were continued on
162 acres of flowage area. The cost of land and flowage acquisitions
during the year was $802,705.37.
   Lock and dam above Alma, Wis. (no. 4).-Construction of the lock
and the upper gate bay of an auxiliary lock under contract was com-
pleted January 5, 1934. The cost for the year was $496,481.35.
   Lock and dam above Fountain City, Wis. (no. 5).-Construction
of the lock and the upper gate bay of an auxiliary lock under con-
tract was completed June 16, 1934. The cost for the year was
$771,280.65.
         RIVERS AND   HARBORS-UPPER      MISSISSIPPI RIVER       789

   Public Works funds-Lock and damr above Red Wing, Minn (no.
3).-Exploratory borings and pile-driving tests were made at the
site by contract and hired labor at a cost of $15,785.50. Only pre-
liminary work was done.
   Lock and dam above Almna, Wis. (no. 4).-A contract for the con-
struction of the dam was entered into October 7, 1933. At the end
of the fiscal year all preliminary work had been done, excavation
and work on the cofferdam practically completed and earth dike
built. The contract was 40 percent completed. A contract was en-
tered into for the construction and installation of the power, con-
trol, and lighting system for the locks and dam. At the end of
the fiscal year the percentage completed was negligible. Work under
the contracts for the clearing of the pool area was completed March
21, 1934. A total of 7,435 acres was cleared. Channel markers,
constructed under contract, were completed April 4, 1934. The cost
for the year was $1,244,308.58.
   Lock and daln above Fountain City, Wis. (no. 5).-A contract
for the construction of the dam was entered into October 5, 1933.
At the end of the fiscal year all preliminary work had been done,
cofferdams 1, 2, and 3 built and unwatered, work begun on founda-
tion, and tainter gates completed and erected. The contract was
48 percent completed. A contract for the improvement of discharge
area and construction of an earth dike was entered into October
10, 1933. At the end of the fiscal year the contract was 50 percent
completed. Work under the contracts for the clearing of the pool
area was completed February 7, 1934. A total of 550 acres was
cleared. The cost was $1,255,844.50.
   Lock and dam above Winona, Minn. (no. 5A ).-A contract for the
construction of the lock was entered into December 22, 1933. At the
end of the fiscal year all preliminary work had been done, cofferdam
built and unwatered, and excavation and work on foundation begun.
The contract was 44 percent completed. The cost was $646,649.70.
   Lock and dam above Trempealear, Wis. (no. 6).-A contract for
the construction of the lock was entered into November 13, 1933.
At the end of the fiscal year all preliminary work had been done,
cofferdam built and unwatered, and excavation and work on foun-
dation begun. The contract was 44 percent completed. The cost was
 $646,649.70. Funds were made available for construction of the
dam, work on which will be started early in fiscal year 1935.
   Lock and dam above La Crosse, Wis. (no. 7).-A contract for the
construction of the lock was entered into November 16, 1933. At the
end of the fiscal year all preliminary work had been done, cofferdam
built and unwatered, and excavation and work on foundation begun.
The contract was 22 percent completed. The cost was $357,767.73.
   Lock and dam below Genoa, Wis. (no. 8).-A contract for the
construction of the lock was entered into December 7, 1933. At the
end of the fiscal year all preliminary work had been done, cofferdam
built and unwatered, and excavation and work on foundation begun.
The contract was 29 percent completed. The cost was $482,856.52.
   Lock and damn below Lynxville, Wis. (no. 9).-A contract for the
construction of the lock was entered into December 29, 1933. At the
end of the fiscal year all preliminary work had been done, cofferdam
built and unwatered, excavation practically completed, and work
790    REPORT OF CHIEF OF ENGINEERS,        U.   S.   ARMY,   1934

begun on foundation. The contract was 17 percent completed. The
cost was $321,103.08.
   Flowage surveys.-Field and office work on the surveys of land for
pools 3, 7, 8, and 9 were carried on throughout the year. Stage,
discharge, and other hydraulic data were taken. Work was done by
hired labor with Government plant at a cost of $54,108.64.
   The total cost of all work (St. Paul district) during the fiscal
year was $7,658,961.80 of which $2,088,701.97 from regular funds and
$5,194,009.10 from Public Works funds, a total of $7,282,711.07 was
for new work and $376,250.73 from regular funds for maintenance.
The total expenditures were $6,458,288.88, including $3,876,219.87
Public Works funds.
   Clarks ile, Mo., to mouth of Wisconsin River (Rock Island dis-
trict)-Regularf n ds.-Construction and maintenance of regulating
works were carried on during the year by hired labor and Govern-
ment plant and contract. Twenty-two dams aggregating 9,810 linear
feet and 4 pieces of shore protection aggregating 3,055 linear feet
were built at a cost of $122,276.71, and 36 dams and 7 pieces of shore
protection were repaired and maintained at a cost of $154,581.33.
   Seven pipe-line dredges, two derrick boats and one dipper dredge
were engaged in channel maintenance work in 74 localities. The
total channel dredged had a length of 55 miles, with widths varying
from 100 to 300 feet. A total of 2,920,450 cubic yards of material
was removed at a cost of $380,500.64.
   During the fiscal year a total of 166 snags and obstructions were
removed by the various Engineer Department boats in the district
at a cost of $4,454.25.
   Lock and damr at Rock Island, Ill. (no. 15) .- Construction of Dam
No. 15 (roller dam) and appurtenant sea wall and intercepting sewer
was completed under contract on May 9, 1934. The lock was com-
pleted in fiscal year 1933. The contract for supplying, assembling
and installing the lock-operating machinery, power-house machinery
and electric-control system for both locks and dam was completed
on March 31, 1934. The construction of a reinforced-concrete pipe
sewer and an earth levee along the Mississippi River and Duck Creek,
west of Bettendorf, Iowa, was completed on August 31, 1933. A
contract for the construction of a driveway, curb drain, catch basin,
and lawn inlet in esplanade was completed on June 23, 1934. The
cost for the year was $745,221.83. Some additional work is being
done in the pool under Public Works funds.
   Lock and dam at Canton, Mo. (no. :20).-The contract for con-
struction of the lock was completed November 29, 1933; the cost for
the year was $475,294.62. The dam is now under construction from
Public Works funds.
   Removing obstructions, Rock River, Ill.-Under authority of the
provisions of section 3 of the River and Harbor Act approved July
3, 1930, an allotment of $1,000 was made for the removal of obstruc-
tions in the pool formed by the dam on Rock River at Sterling, Ill.,
a tributary of the Mississippi River. No work was done during the
year, and no expenditures were made.
   Public Works funds--Lock and damn at Guttenberg, Iowa (no.
10).-Test borings at lock and dam sites were completed under con-
tracts. A contract for the construction of temporary buildings was
          RIVERS AND IIARBORS-UPPER       1MISSISSIPPI   RIVER    791
completed on March 26, 1934. A contract was let on February 24,
1934, for the construction of a lock, operating machinery, and central
control station. At the end of the fiscal year all preliminary work
had been done, cofferdam built and unwatered, and work on founda-
tion begun. The contract was 18 percent completed. The cost was
$254,670.90.
   Lock and dam above Dubuque, Iow a (no. 11).-Test borings at
lock and dam sites were completed under contracts. A contract for
the construction of temporary buildings was completed on February
17, 1934. A contract for the construction of a roadway to the lock
was completed on June 21, 1934. A contract was let on January 31,
1934, for the construction of a lock, operating machinery, and central
control station. At the end of the fiscal year all preliminary work
had been done, cofferdam built and unwatered, and driving of wood
piles and common excavation within the cofferdam was in progress.
The contract was 18 percent completed. The cost for the year was
$314,009. 80.
   Lock and damn at Bellevue, Iowa (no. 12).-Test borings at lock
and dam sites were completed under contracts. A contract was let
on February 12, 1934, for the construction of a lock, operating ma-
chinery, and central control station. At the end of the fiscal year
all preliminary work had been done, cofferdam built and unwatered,
and driving of wood piles and common excavation within the coffer-
dam was in progress. This contract was 13 percent completed. The
cost was $201,173.41.
   Lock and dam above Clinton, Iowa (no. 13).-Test borings at lock
and dam sites were completed under contract. Only preliminary
work was done.
   Lock and dam below, Le Claire, Iowa (no{. 14).-Test borings at
lock and dam sites were completed by hired labor. Only prelimi-
nary work was done.
   Lock and dam at Rock Island, Ill. (no. 15).-The contract for con-
struction of a levee, fill, and roadway, reconditioning other road-
ways, and clearing certain areas along the north shore of Arsenal
Island was completed on February 15, 1934, at a cost of $70,759.96.
   Lock and dam above Muscatine, Iowa (no. 16).-The construction
of temporary buildings was completed under contract on January 17,
1934. The contractor completed test borings for dam site. A con-
tract was let on November 3, 1933, for the construction of a lock,
operating machinery, and central control stations. At the end of the
fiscal year all preliminary work had been done, cofferdam built and
unwatered and driving of wood piles, common excavation within the
cofferdam and pouring concrete for land and river walls was in
progress. The contract was 48 percent completed. The cost of all
work during the fiscal year was $686,400.25.
   A contract was let on October 20, 1933, for the excavation of rock
to a depth of 11 feet in the vicinity of Horse Island (Pool No. 16),
476 to 478 miles above the Ohio River. At the close of the fiscal
year the work was about 47 percent completed, the cost being
$160,531.41.
   Lock and dam above New Boston, Ill. (no. 17).-Test borings at
lock and dam sites under contract were completed on February 12,
1934. Only preliminary work was done.
792    REPORT   OF CHIEF OF ENGINEERS,     U.   S.   ARMY,   1934

   Lock and dam above Burlington, Iowa (no. 18).-Test borings for
lock site were completed under contract on January 30, 1934. Test
borings for dam sites were completed by hired labor. The con-
tractor completed construction of temporary buildings on February
6, 1934. The construction of a roadway to lock site was completed
under contract on June 9, 1934. A contract was let on January 26,
1934, for the construction of a lock, operating machinery, and central
control station. At the end of the fiscal year all preliminary work
had been done, cofferdam built and unwatered, and driving piles and
pouring concrete for monoliths and guide walls was in progress.
The contract was 28 percent completed. The cost of all work for the
year was $427,685.49.
   Lock and dam at Keokuk, Iowa (no. 19).-Test borings for the
lock site were in progress by hired labor. At the close of the fiscal
year the work was 20 percent completed. Only preliminary work
was done.
   Lock and dam at Canton, Mo,. (no. 20).-A contract was let on
October 16, 1933, for the construction of a tainter and roller dam,
levee, shore protection, and roadway. At the end of the fiscal year
all preliminary work had been done, the first cofferdam built and un-
watered, excavation and driving wood piles within the cofferdam in
progress, and work on foundation begun. The contract was 22 per-
cent completed. The lock was completed from regular funds. A
contract for excavation and disposal of material in the river bed
below the lock was completed on May 1, 1934. The cost for the year
was $850,079.74.
   Lock and dam below Quincy, Ill. (no. 21).-Test borings for
lock site were completed by hired labor. Test borings for dam site
were completed under contract on January 20, 1934. A contract was
let on November 28, 1933, for the construction of a lock, operating
machinery, and central control station. At the end of the fiscal
year all preliminary work had been done, cofferdam built, and
unwatered and excavation and driving piles within the cofferdam
and pouring concrete for upper guide wall was in progress. The
contract was 36 percent completed. The cost for the year was
$631,490.37.
   Lock and darn below Saverton, Mo. (no. 22).-Test borings for
lock and dam sites were completed by hired labor. The construc-
tion of temporary buildings was completed under contract on Feb-
ruary 15, 1934. Construction of a roadway to the lock site was
completed under contract on June 14, 1934. A contract was let on
January 8, 1934, for the construction of a lock, operating machin-
ery, and central control station. At the end of the fiscal year all
preliminary work had been done, cofferdam built and unwatered,
and excavation and driving piles within the cofferdam and pouring
concrete for upper guide wall was in progress. The contract was
16 percent completed. The cost for the year was $327,476.24.
   Lock and damn below Louisiana, Mo. (no. 23).-Test borings for
lock and dam sites were completed under contract. Only prelimi-
nary work was done as no funds have been allotted for construction
of the lock and dam.
   Extensive surveys in connection with the location of the proposed
dam sites, flowage areas, land acquisition, stream gaging, etc., were
carried on by hired labor at a cost of $513,066.32.
               RIVERS AND HARBORS-IPPER                                        MISSISSIPPI                     RIVER                  793
   The total cost of all work (Rock Island district) during the fiscal
year was $6,390,467.47, of which $1,213,827.52 from regular funds
and $4,464,594.11 from Public Works funds, a total of $5,678,421.63
was for new work and $712,045.84, regular funds for maintenance.
The total expenditures were $5,367,940.82, including $3,448,703.53
from Public Works funds.
  Missouri River to Clarksville, Mo. (St. Loais district)-Regular
funds.-Unusually low river stages were very favorable, and exten-
sive construction work was carried on throughout the year by hired
labor with Government plant and by contract from July 1, 1933, to
June 30, 1934. The district's standard specifications for construction
work were used. Regulating works were maintained and project
dimensions of channels were secured by dredging. Locations, quan-
tities, and costs of regulating works follow:

                                                 Dikes or hurdles                            Bank protection (revetment)

                             Miles                                                                    Mattress
                             above
Class of work and locality   mouth                                                                                    Paving
                              Ohio      Num-
                                         her
                                                    Linear
                                                     feet
                                                                     CostsNum
                                                                                             ee
                                                                                               Linear
                                                                                                      Sqar
                                                                                                                      squares
                                                                                                                        100      Costs
                             River                                                             bank          100      square
                                                                                               pro-         square     feet
                                                                                              tected

New work, by contract:
Wood River, Ill .......        196                            $19, 951. 37        (1)           ()            256     1, 019 $47, 117. 04
New work, by United
States plant and hired
labor:
   Alton, Ill _---------        203        (2)         (2)       4, 435. 47
    Cuivre Island ........      236   -------        ......       .____ '___----         1            920      592       346    16, 171. 41
   W ilson Island--------       244 .............                                        1            975       423       373   16,   466.   89
   Sandy Island ........        245 ..                                                   1            865       346       218   11,   611.   99
   Maple Island ........        249                                                      1      2,    560    1, 027    1, 062   35,   962,   51
   Sterling Island .------      252                           _---
                                                               .-     _____-                   1,
                                                                                         1-------     070       651       256   13,   447.   21

     Total______________     ________________ ________           4, 435. 47              5     6, 390        3, 039    2, 255   93, 660. 01

Maintenance by United
States plant and hired
labor _-                                                130     4, 975.22          1..                      4, 300    8, 368 205, 494. 19


1 Reported in Annual Report, 1933.
2 Driving guide piles at Alton railroad bridge.


   The cost of regulating works from regular funds was $375,633.30
of which $165,163.89 was for new work (including $67,068.41 for
contract work), and $210,469.41 for maintenance.
  The U. S. dredges Dundee, Ste. Genevieve, Selma, Clark,
Thebes, and Grafton dredged a total of 10,747,090 cubic yards of
material in dredging 67 channels through 75 bars obtaining a mini-
mum depth of 9 feet. In addition, 1,821,337 cubic yards of material
were removed in dredging outside the channel. The cost of dredg-
ing was $406,886.50, all charged to maintenance. The snagboat
Wright removed numerous obstructions at a cost of $1,669.69, charged
to maintenance. Hydrographic surveys were made covering 90 miles
of river, costing $21,508.68, charged to maintenance.
  Public Works funds.-At Wood River, Ill., 197 miles above the
Ohio River, 5,615 linear feet of new bank protection, consisting of
794    REPORT   OF CHIEF OF ENGINEERS,     U.   S.   ARMY,   1934

324,700 square feet of mattress and 240,600 square feet of paving, was
completed under contract at a cost of $82,619.53.
  Look and Dam at Alton, Ill. (no:. 26).-On December 29, 1933,
a contract was entered into for construction of twin locks. At
the end of the fiscal year all preliminary work had been done, cof-
ferdam built and unwatered and work begun on foundation of lock
walls and interceptor sewer. The contract was about 15 percent
completed. The cost of all work during the fiscal year was $276,-
364.43. Flowage surveys by Government plant with hired labor
were about 40 percent completed at the close of the fiscal year and
the cost was $57,365.75.
   The total cost of all work (St. Louis district) during the fiscal
year was $1,289,219.15 of which $232,335.16 were regular funds and
$416,349.71, Public Works funds, a total of $648,684.87 was for new
work and $640,534.28 regular funds for maintenance. The total ex-
penditures were $1,234,771.92, including $358,369.19 from Public
Works funds.
   The total cost during the fiscal year for the three sections from
the mouth of the Missouri River to Minneapolis, Minn., was $15,-
338,648.42 of which $13,609,817.57 ($3,534,864.65 regular funds, and
$10,074,952.92 Public Works funds), were for new work, and
$1,728,830.85 regular funds for maintenance. The total expenditures
were $13,061,001.62, of which $5,377,709.03 were regular funds and
$7,683,292.59 were Public Works funds.
                 CONDITION   AT END OF FISCAL YEAR


   The 9-foot canalization project as a whole is about 16 percent
completed.
   Mouth of Wisconsin River to Minneapolis, Minn. (St. Paul dis-
trict)-Regularfunds.-The Minneapolis turning basin; dredging of
the upper limits of the Hastings Pool; widening of the channel at
the St. Paul terminal; channel realinement at Crooked Slough; the
Twin City Locks and Dam; the Hastings Lock and Dam (except
auxiliary lock) ; and Locks Nos. 4 and 5 have been completed. Most
of the flowage easements required for Hastings Lock and Dam have
been acquired, and all of the estimated awards in condemnation have
been paid into court. Clearing of the Hastings Pool has been com-
pleted to elevation 685.75 mean sea level.
  Public Works f ds.-Work was in progress on the construction
of dams above Alma, Wis., and above Fountain City, Wis.; locks
above Winona, Minn., above Trempealeau, Wis., above LaCrosse,
Wis., below Genoa, Wis., and below Lynxville, Wis.; stream gaging,
and surveys for land flowage acquisition. Funds were made avail-
able for construction of dams above Winona, Minn., and above
Trempealeau, Wis., work to begin in fiscal year 1935. For percent-
age of completion of locks and dams see table under paragraph
Existingy project.
   Flowage surveys for pools of proposed locks and dams have been
completed as follows: Field work and mapping for pools nos. 4, 5,
5A, 6, and 7, 100 percent; field work 90 percent and mapping 50 per-
                  RIVERS          AND         HARBORS--UPPER                MISSISSIPPI RIVER                        795
cent for no. 3; fieldwork 95 percent and mapping 75 percent for no.
8; field work 10 percent for no. 9.
                                     LAND AND FLOWAGE ACQUISITION

   The acquisition of lands for the sites, and areas under flowage, of
the locks and dams has progressed as follows:
   No. 4, Alma, Wis.-Possession of all lands for lock and dam sites
and pool area, 3,700 acres, has been acquired by condemnation.
   No. 5, Fountain City, Wis.-Condemnation proceedings are pend-
ing and have been partially completed on all lands for lock and darn
sites and pool area, 9,500 acres.
   No. 5A, Winona, Minn.-Condemnation proceedings for the lock
site, 53 acres, have been completed.
   No. 6, Trempealeau, IWis.-Negotiations for purchase were
begun, and possession acquired, of 57 acres for the lock site. Con-
demnation proceedings are now pending on 56 acres for the dam site.
   Nos. 7, 8, 9.-Possession of the lock sites has been acquired by
condemnation.
   The total cost under the existing project (St. Paul district) to
June 30, 1934, was $12,229,182.49 of which $10,819,732.49 ($5,625,-
723.39 regular funds and $5,194,009.10 Public Works funds) were for
new work and $1,409,450 regular funds for maintenance. The total
expenditures have been $11,055,062.65, including $3,876,219.87 from
Public Works funds.
   Clarksville, Mo., to mouth of Wisconsin River (Rock Island dis-
trict)-Regular funds.-At the end of the fiscal year work was in
progress on the construction and repair of dams and shore protection,
pipe-line dredging, rock excavation, and removal of snags. Lock
and Dam No. 15 and Lock No. 20 have been completed.
   Public Works funds.-Work was in progress on the construction
of a Tainter and roller dam at Canton, Mo., locks at Guttenberg,
Iowa, above Dubuque, Iowa, at Bellevue, Iowa, above Muscatine,
Iowa, above Burlington, Iowa, below Quincy, Ill., and below Saver-
ton, Mo., excavation of rock in the vicinity of Horse Island, stream
gaging, and surveys for land flowage acquisition. Funds were made
available for construction of dams at Guttenberg, Iowa, and above
Muscatine, Iowa, work to begin in fiscal year 1935. For percentage
of completion of locks and dams see table under paragraph Existing
project.
   The following table gives the condition of the channel:

                                                        Affording      Affording      Affording     Proted
                                                        over 9 feet    6 to 9 feet    less than     channeld Controlling
               Section                       section of
                                             Length  1    at low         at low        6 feet at     width    depths 2
                                                          water          water       low water

Wisconsin River to Rock Is-                   Miles        Miles         Miles         Miles          Feet           Feet
  land Rapids_-.-----.
                .134.  --- _                          4       124. 1          9. 9           0. 4         900               5. 1
Rock Island Rapids to Rock
Island_----. ------                 -----        13. 7        12. 0          1. 7           0. 0     250-300               6. 8
Rock Island to Keokuk.......                     118. 6       103. 0         15. 5           0. 1       1, 000              5. 0
Keokuk to Hannibal----------..........            54. 4        40. 9         12. 7           0. 8       1, 000              5. 0
Hannibal to Clarksville.......                    36. 9        22. 3         14. 0           0. 6       1, 200              4. 7
                                                 358. 0       302. 3         53.8            1.9 _       _       _

1Revised mileage measured along a midchannel line established in 1931.
2 Since the reefs (shoal areas) rise as the river rises and fall as the river falls, the controlling depth, in years
when there is no extreme low water, can be determined only approximately.
796      REPORT    OF CHIEF     OF ENGINEERS,       U.   S.   ARMY,     1934


  During April, May, and June a draft of approximately 7 feet is
usually practicable with a gage reading of 5 feet. During July,
August, September, and October the gage reading is usually above
2 feet. At such times and even when the gage is lower a 5-foot
draft is usually practicable.
   The total cost under the existing project (Rock Island District)
to June 30, 1934, was $14,997,066.12, of which $12,238.633.20 ($7,774,-
039.09 regular funds and $4,464,594.11 Public Works funds) were for
new work and $2,758,432.92 regular funds for maintenance. The
total expenditures were $12,688,539.24, including $3,448,703.53 from
Public Works funds.
  Missouri River to Clarksville, Mo. (St. Louis district)-Regular
funds.-The existing channel in this stretch of the river was main-
tained by dredging with the aid of some new regulating works below
Alton, Ill.
  Public Works funclds.-New regulating works were completed be-
low Alton, Ill. Work was in progress on twin locks at Alton, Ill.,
stream gaging, and surveys for land flowage acquisition. For per-
centage of completion of the locks see table under paragraph
Existing project.
   The total cost under the existing project (St. Louis District) to
June 30, 1934, was $2,030,831.30, of which $564,637.88 ($148,288.17
regular funds and $416,349.71 Public Works funds) were for new
work and $1,466,193.42 regular funds for maintenance. The total
expenditures were $1,972,850.78, including $358,369.19 from Public
Works funds.
   The total cost under the existing project on the three sections to
June 30, 1934, was $29,257,079.91, of which $23,623,003.57 ($13,548,-
050.65 regillar funds and $10,074,952.92 Public Works funds) were
for new work and $5,634,076.34 regular funds for maintenance. The
total expenditures were $25,716,452.67, of which $18,033,160.08 were
regular funds and $7,683,292.59 were Public Works funds.
  Proposed operations-Regular funds.-The balance unexpended,
including accounts receivable, at the end of the year will be applied
as follows:
Accounts payable, June 30, 1934-----___------------------------             $94, 103.96
New work :
    Hastings Lock and Dam: Land and flowage ac-
      quisition (definite dates cannot be stated) ---  $200, 000. 00
    Construction of channel markers (emergency
      construction funds), act July 21, 1932) --------    19,000'. 00

        Total new work------------------------------_                       219, 000. 00
Maintenance:
   Channel maintenance dredging (July 1934 to
        June 1935) --------------------------         $877, 957. 46
   Maintenance of existing regulating works and
      shore protection (July 1934 to June 1935)___ 208, 500. 00
   Examinations, surveys, engineering studies, and
      design of structures by hired labor (definite
      dates cannot be stated) ---------------------- 265, 000. 00
   Construction of two gasoline work launches and
      one quarterboat by contract (definite dates
      cannot be stated)_ ------------------------- 17, 000. 00
      Construction of 2-story fireproof shed and bulk-
       head wall at Fountain City boat yard by con-
       tract (definite dates cannot be stated)-------         20, 000. 00
            RIVERS AND HIARBORS-UPPER               MISSISSIPPI RIVER               797
Maintenance-Continued.
   Surveys and snagging (July 1934 to June 1934)-          $35, 000. 00
   Removal of snags and stumps in Rock River, Ill.
      (August and September 1934) --------------             1, 000. 00
        Total, maintenance__--- _____-_________               _           $1, 424, 457. 46
Unallocated balance___________-______________                                  64, 265. 35
         Total, regular funds __________________1,                           801, 826. 77
  Public Works funds.-The balance unexpended, including accounts
receivable, at the end of the year, together with allotment of
$17,360,000 made since June 30, 1934, will be applied as follows:
Accounts payable, June 30, 1934___                                     $2,430, 880.72
Dam No. 4 (Alma) (by contract):
    Complete construction of dam (July 1934 to,
      April 1935)                                    $1, 500, 000. 00
    Complete electrical installation (July 1934
       to May 1935) ----------------------               100, 000. 00
    Complete Taintor gate hoists, locomotive
       crane, and miscellaneous equipment (July
       1934 to April 1935)                                ,80, 000. 00
    Construction of lockkeepers' dwellings and
       service buildings (January to July 1935)     --     25, 000. 00
    Reconstruction of Lake City pier (August
       to December 1934)____           __________          60, 000. 00
    Complete land and flowage acquisition by
       hired labor (definite dates cannot be
       stated)   _ -_________-
                          -_____-___                     180, 000. 00
                                                            --          1, 945, 000. 00
Dam No. 5 (Fountain City) (by contract):
    Complete construction of dam (July 1934
       to April 1935)                                 1, 200, 000. 00
    Complete dredging to improve discharge
       channel, and constructing earth dike (July
       1934 to April 1935)______________________         250, 000. 00
    Complete electrical installation (July 1934 to
       May 1935)-}           -    _-___-                 100, 000. 00
    Complete Tainter gate hoists, locomotive
      crane, and miscellaneous equipment (July
      1934 to April 1935----------------------             80,000. 00
    Construction of lockkeepers' dwellings and
      service buildings (January to July 1935)__           25, 000. 00
    Construction of channel markers (October
      1934 to March 1935)                                  30, 000. 00
    Clearing pool area (September 1934 to March
      1935)___--                                         550, 000. 00
    Complete land and flowage acquisition by
      hired labor (definite dates cannot be stated.)     390, 000. 00
                                                                       2, 625, 000. 00
Lock and Dam No. 5A (Winona) (by contract) :
    Complete construction of lock (July 1934 to
      February 1935)           ___                       910, 000. 00
    Construction of dam (November 1934 to April
      1935____--------------                          1, 750, 000. 00
    Clearing pool area (16 percent complete)
       (lands now owned by United States) (Sep-
      tember 1934 to March 1935)                           55, 000. 00
    Construction of earth dike (November 1934 to
      April 1936)--------------                          500, 000. 00
   Electrical installation (March 1935 to May
     1936)-                                                90, 000. 00
   Construction of lockkeepers' dwellings (Jan-
      uary to June 1936)                                   25. 000. 00
798       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

Lock and Dam No. 5A-Continued.
    Tainter gate hoists, locomotive crane, etc.
      (June to December 1935) ---------------                  $30, 000. 00
                                                                               $3, 360, 000.00
Lock and Dam No. 6 (Trompealeau) (by contract) :
    Complete construction of lock (July 1934 to
      January 1935)--------------------------800, 000. 00
    Construction of dam (September 1934 to
      March 1936) __         --      --           2, 450, 000. 00
    Electrical installation (March 1935 to May
      1936) __----------------------------------      90, 000. 00
    Construction of lockkeepers' dwellings (Janu-
      ary to June 1936) -----------------------       25, 000. 00
    Tainter gate hoists, locomotive crane, etc.
      (June to December 1935) -----------------       30, 000. 00
    Clearing pool area (17 percent complete)
      (land now owned by United States) (Sep-
      tember 1934 to March 1935) ---------            30, 000. 00
                                                                                3, 425, 000. 00
Lock No. 7 (La Crosse) (by contract) : Complete construction of
  lock (July 1934 to February 1935) -----------------------                     1, 050, 000. 00
Lock No. 8 (Genoa) (by contract) : Complete construction of
  lock (July 1934 to January 1935) --------------------------                   1, 200, 000. 00
Lock No. 9 (Lynxville) (by contract) : Complete construction of
  lock (July 1934 to February 1935) -----------------------                     1, 375, 072. 21
Lock and Dam No. 10 (Guttenberg) (by con-
  tract) :
     Complete construction of main lock (July
      1934 to February 1935)----------------                $1, 226, 420. 52
     Construction of dam (October 1934 to Octo-
      ber 1936) ---------------------------- 3, 000, 000. 00
                                                                       4, 226, 420. 52
Lock No. 11 (Eagle Point) (by contract): Complete construc-
  tion of main lock (July 1934 to February 1935)-------------1, 373, 455. 22
Lock No. 12 (Bellevue) (by contract) : Complete construction of
  main lock (July 1934 to February 1935) -------------------           1, 288, 134.73
Pool No. 15 (by contract) :
     Remove Dams 9 and 39, and loose rock in pro-
       jected channel at Duck Creek, mile 488
       above Cairo, Ill.(July 1934 to January
       1935) ---------------------------------------------                402, 690.77
Lock and Dam No. 16 (Muscatine) (by contract) :
     Complete construction of main lock (July to
       December 1934) ------------------------          $743, 839. 22
     Construction of dam (September 1934 to
       September 1936)          ---------------------- 3, 000, 000. 00
                                                                       3, 743, 839. 22
Pool No. 16 (by contract) : Complete rock excavation in vicinity
  of Horse Island, miles 475 to 478 above Cairo, Ill. (July 1934
  to June 1935) ----------------------------------              -----     392, 371. 51
Lock No. 18 (Burlington) (by contract) : Complete construction
  of main lock (July 1934 to February 1935) -----------------          1, 093, 166. 37
Dam No. 20 (Canton) (by contract): Complete construction
  of dam, machinery, and shore protection (July 1934 to
  June 1935 _ -----------------------------------------                2,310, 821. 52
Lock No. 21 (Quincy) (by contract) : Complete construction of
  lock (July to December 1934) -                                          060,524.19
                                                                       1-------------------------,
Lock No. 22 (Saverton) (by contract) : Complete construction
  of lock (July 1934 to January 1935) --------------------- 1, 054, 100. 32
            RIVERS     AND HARBORS-UPPER               MISSISSIPPI      RIVER           799
Lock and Dam No. 26 (Alton) (by contract) :
    Complete construction of locks and operating
      machinery (July 1934 to September 1935) _ $3, 411, 000. 00
    Complete construction of interceptor sewer
      from Piasa Junction to end of lock (July to
      September 1934)--------------------------          35, 000. 00
    Complete construction of cut-off wall (July to
      October 1934)------------------------             250', 000. 00
    Construction of dam and accessories (Septem-
      ber 1934 to September 1936) -------------      3, 950, 000.00
    Pier protection (January to June 1935)-            --
                                                        250, 000. 00
    Purchase of land for abutment (July to De-
      cember 1935)___________________________             14, 000. 00
    Abstracts, negotiation for flowage easements
      and clearing (March to June 1935)       --.--.    240, 000.00
    Surveys of pool by hired labor (July 1934 to
       April   1936)                                   __       65, 140. 63
                                                                              $8, 215, 140. 63

Maple Island (by contract) : Solid dikes (September 1934 to
  January 1935) ---------------------------------------------                    360, 000.00
Engineering studies for locks and dams for which funds have
  not otherwise been provided--------------------------------                    345, 000. 00
      Total, Public Works funds -----------------------    43, 276, 617. 93
  It is not possible to state definitely the rate at which funds avail-
able at the close of the year will or can be expended as the rate of
progress is controlled largely by weather and river conditions.
However, it is believed that the balance available will be practically
exhausted at the end of the fiscal year 1935.
  The sum of $36,400,000 can be profitably expended during the fiscal
year 1936 as follows:
New work:
   Lock and Dam No. 3 (Red Wing) : Construction of lock----                      $2, 000, 000
   Lock and Dam No. 7 (La Crosse) : Construction of dam- ___-                     3, 000, 000
     Lock and Dam No. 8 (Genoa) : Construction of dam              ---_.___        3, 000, 000
     Lock and   Dam    No. 9 (Lynxville) : Construction of dam-.____              3, 000, 000
     Lock and   Dam    No. 11 (Eagle Point) : Construction of dam-                3, 000, 000
     Lock and   Dam    No. 12 (Bellevue) : Construction of dam-------             3, 000, 000
     Lock and   Dam    No. 13 (Clinton) : Construction of lock-____               2, 000, 000
     Lock and   Dam    No. 14 (Le Claire) : Construction of lock-------           2, 000, 000
     Lock and   Dam    No. 17 (New Boston).: Construction of lock___              2, 000, 000
     Lock and   Dam    No. 18 (Burlington) : Construction of dam ___              3, 000, 000
     Lock and   Dam    No. 21 (Quincy) : Construction of dam_ ...   ___           3, 000, 000
     Lock and   Dam    No. 23 (Louisiana) : Construction of lock------            2, 000, 000
     Lock and   Dam    No. 24 (Hamburg) : Construction of lock-------             2,000, 000
     Lock and   Dam    No. 25 (Cap Au Gris) : Construction of lock__              2, 000, 000

       Total, new work_____________----------------------------------------      35, 000, 000

Maintenance:
   Channel maintenance dredging and maintenance of existing
      regulating works (July 1935 to June 1936) -----------------                 1, 375, 000
   Snagging, surveys, gages, and studies ----------------                             25, 000

       Total maintenance ----------------------                                    1, 400, 000

       Total--------------------------------------                               36, 400, 000
  It is expected that the proposed expenditure will complete about
66 percent of the project.
      91536-ENG 1934         51
800             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                      1934

                                             Cost and financial summary

                                     MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to Jupe 30, 1934_        --                                                          __$62, 105, 666. 61
Cost of maintenance to June 30, 1934 ___.11111____1                                                             9, 400, 726.64

      Total cost of permanent work to June 30, 1934 ______---                                                  71, 506, 393. 25
Value of plant, material, etc., on hand June 30, 1934 _.___   _                                                 1, 398, 567. 16

      Net total cost to June 30, 1934--               --------                                                 7------_____
                                                                                                               72, 904, 960. 41
Plus accounts receivable June 30, 1934___ ____________-____--                                                        29, 566. 30

     Gross total costs to June 30, 1934 ________      ___--...                                                 72, 934, 526. 71
Minus accounts payable June 30, 1934 --- _____----.__    ----- _                                                    94, 103. 96

     Net total expenditures____--  ____-__________                                                             72, 840, 422. 75
                                    -____
Unexpended balance June 30, 1934__________.      ___ _                                                          1, 772, 260. 47
           Total amount appropriated to June 30, 1934___--------
                                                     -74,                                                            612, 683. 22

    Fiscal year ending June 30                    1930              1931              1932              1933             1934


Cost of new work-..          --........... $3, 072, 538. 23 $1, 623, 095. 63 $4, 383, 205. 26 $4, 916, 248. 31       $3, 534, 864. 65
Cost of maintenance---------...........        760, 982. 05 2, 163, 165. 69 1, 217, 577. 20 1, 569, 682. 17           1, 728, 830. 85
        Total cost.--------------3, 833, 520. 28               3, 786, 261. 32   5, 600, 782. 46   6, 485, 930. 48    5, 263, 695. 50
Total expended...........--------------...   3, 725, 820. 24   3, 809, 495. 02   4, 924, 556. 94   6, 320, 428. 24    5, 377, 709. 03
Allotted.------------------------            2, 317, 280. 22   6, 410, 342. 42     191, 421. 33    9, 235, 577. 14    2, 766, 905. 74


Balance unexpended July 1, 1933---- ----------------        ___-   $4, 383, 063. 76
Amount allotted from War Department Appro-
priation Act approved Apr. 26, 1934-.----        $1, 359, 500. 00
Amount allotted from War Department Appro-
                                             --
priation Act approved July 14, 1932 _________        704, 559. 76
Compensation deductions reimbursed from other
  departments       -----------------------------          797. 32
Amount allotted from War Department Appro-
priation Act approved Mar. 4, 1933-----------1, 732, 556. 18
                                                                    3, 797, 413. 26

     Amount to be accounted for-__       ---
                                         _____-______         -                                                 8, 180, 477. 02
Deductions on account of revocation of--
   Allotments-----------------------------            $956, 212. 92
   Impounded funds---------------------           .     74, 294. 60
                                                                                                                1, 030, 507. 52

      Net amount to be accounted for.--------------------                                                       7, 149, 969.50
Gross amount expended__--__---- ----           __-    $6, 619, 267. 18
Less:
    Reimbursements collected ....    $1, 165, 070. 20
    Receipts from sales----------         76, 487. 95
                                                       1, 241, 558. 15
                                                                                                                5, 377, 709.03

           Balance unexpended June 30, 1934 --------                                         ------             1, 772, 260. 47
                       RIVERS AND HARBORS-UPPER MISSISSIPPI RIVER                                                                    801
Outstanding liabilities June 30, 1934_----------                                                $128, 163. 65
Amount covered by uncompleted contracts--...                                                       9, 257. 71
                                                                                                                           $137, 421. 36

     Balance available June 30, 1934                                           ___            --
                                                                                     -- _______                          1, 634, 839. 11
Accounts receivable June 30, 1934---.                                          __..--------------                            29, 566. 30

             Unobligated balance available June 30, 1934__ -______-                                                      1,664, 405.41
Amount that can be profitably expended in fiscal year ending
June 30, 1936, for maintenance 1_____-  -__-_____ -___                                                                  1, 400, 000. 00
                                                           PUBLIC           WORKS     FUNDS

Cost of new work to June 30, 1934 ._______-__-.________    $10, 074, 952. 92
Cost of maintenance to June 30, 1934______       ___________

      Total cost of permanent work to June 30, 1934 -----------. 10, 074, 952. 92
Value of plant, materials, etc., on hand June 30, 1934                21, 929. 40                    ---------
      Net total cost to June 30, 1934_________________ 10, 096, 882. 32
Plus accounts receivable June 30, 1934_______________________ 17, 290. 99

      Gross total costs to June 30, 1934_______________-__ 10, 114, 173. 31
Minus accounts payable June 30, 1934 ___-    ___  ___- ___-_2, 430, 880. 72

      Net total expenditures- -------------------------     - 7, 683, 292. 59
Unexpended balance June 30, 1934______-_____     ________-__ 25, 899, 326. 91

             Total amount appropriated to June 30, 1934_ ____________ 33, 582, 619. 53

     Fiscal year ending June 30                             1930              1931            1932            1933                1934


                                                                 ..................--------------........-------------..
Cost of new work--------------------..............--------.............                                                     $10, 074, 952. 92
Cost of maintenance....---------                   -------------                     -----------------        ---------------------
Total expended........----------                            -------------              ---------.......--------------         7, 683, 292. 59
Allotted..........------------------------------...------------..                                                 ....       33, 582, 619. 53


Amount allotted from National Industrial Recovery Act ap-
  proved June 16, 1933-----------------------------------            $33, 582, 619. 53
Gross amount expended       ---------------- _     $7, 787, 879.02
Less:
    Reimbursements collected--- $104, 541.43
    Receipts from sales-.____-..            45. 00
                                                       104, 586. 43
                                                                       7, 683, 292. 59
      Balance unexpended June 30, 1934 ___ ______---_25,                  899, 326. 94
Outstanding liabilities June 30, 1934__.________       $31, 318. 68
Amount covered by uncompleted contracts---- 23, 175, 028. 20
                                                                      23, 206, 346. 88
      Balance available June 30, 1934_____-------                      2, 692, 980. 06
Accounts receivable June 30, 1934_-............     ___... _        -___ 17, 290. 99
      Unobligated balance available June 30, 1934------------2,710, 271. 05
Amount allotted by the Public Works Administration Emer-
  gency Appropriation Act, fiscal year 1935----------------- 17, 360, 000. 00
      Balance available for fiscal year 1935-----------------20, 070, 271. 05

Amount (estimated) required to be appropriated for completion
of existing project --------------------------------------- 85, 200, 000. 00
Amount that can be profitably expended in fiscal year ending
 .Tune 30, 1936, for new work 1 ---     -        -     -     - 35, 000, 000. 00


    1Exclusive of available funds.
802          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                  1934

CONSOLIDATED          COST AND       FINANCIAL SUMMARY FOR MISSISSIPPI                                RIVER,    MISSOURI
                                     RIVER TO MINNEAPOLIS, MINN,

Cost of new work to June 30, 1934-   --------------------- $72, 180, 619. 53
Cost of maintenance to June 30, 1934__....____.____-         9, 400, 726. 64
      Total cost of permanent work to June 30, 1934----------                                           81, 581, 346. 17
Value of plant, materials, etc., on hand June 30, 1934--------                                           1, 420, 496. 56
      Net total cost to June 30, 1934-  __ ___-__________                                               83, 001, 842. 73
Plus accounts receivable June 30, 1934_.____.__  _______--                                                - 46, 857. 29
      Gross total costs to June 30, 1934_.                                                              8______________
                                                                                                        83, 048, 700. 02
Minus accounts payable June 30, 1934___--.                                  ________ -__                 2, 524, 984. 68
     Net total expenditures________--____ -----  __                                                     80, 523, 715. 34
Unexpended balance June 30, 1934____     _______________                                                27, 671, 587.41
         Total amount appropriated to June 30, 1934 ----------                                        108, 195, 302. 75

    Fiscal year ending June 30             1930              1931              1932              1933               1934


Cost of new work ..------------      $3, 072, 538. 23 $1, 623, 095. 63 $4, 383, 205. 26 $4, 916, 248. 31 $13, 609, 817. 57
Cost of maintenance-........-_           760, 982. 05 2, 163, 165. 69 1, 217, 577. 20 1, 569, 682. 17      1, 728, 830. 85
      Total cost ...--------------    3, 833, 520. 28   3, 786, 261. 32   5, 600, 782. 46   6, 485, 930. 48    15, 338, 648. 42
Total expended .--------------        3, 725, 820. 24   3, 809, 495. 02   4, 924, 556. 94   6, 320, 428. 24    13, 061, 001. 62
Allotted----------------------2,        317, 280. 22    6, 410, 342. 42     191, 421. 33    9, 235, 577. 14    36,349,525.27


Balance unexpended July 1, 1933 .--.                                                            _--     $4, 383,063. 76
Amount allotted from War Department Appro-
  priation Act approved Apr. 26, 1934__________ $1,                                359, 500. 00
Amount allotted from War Department Appro-
  priation Act approved July 14, 1932_                                             704, 559. 76
Compensation deductions reimbursed from other
  departments----------------------------                                                   797. 32
Amount allotted from War Department Appro-
  priation Act approved Mar. 4, 1933__-_____     1,                                732, 556. 18
Amount allotted from National Industrial Re-
  covery Act approved June 16, 1933----------33,                                   582, 619. 53
                                                                                                        37, 380, 032. 79

      Amount to be accounted for------------------------      41, 763, 096. 55
Deductions on account of revocation of-
   Allotments---------------------------------  $956, 212. 92
   Impounded funds --------------------------     74, 294. 60
                                                               1, 030, 507. 52

      Net amount to be accounted for---___-           ______-------- 40, 732, 589. 03
Gross amount expended-------------------          $14, 407, 146. 20
Less:
    Reimbursements collected.... $1, 269, 611. 63
    Receipts from sales --------      76, 532. 95
                                                    1, 346, 144. 58
                                                                     13, 061, 001. 62

         Balance unexpended June 30, 1934 --                          _-----------------27,                   671, 587.41
                 RIVERS AND HARBORS-UPPER                            MISSISSIPPI RIVER                      803
Outstanding liabilities June 30, 1934_ __--_                                $159, 482. 33
Amount covered by uncompleted                    contracts -_-           23, 184, 285. 91
                                                                                   --------- $23, 343, 768. 24

     Balance available June 30, 1934__ _                      4, 327, 819. 17
Accounts receivable June 30, 1934_
                                 ----------------------------     46, 857. 29

     Unobligated balance available June 30, 1934------------4, 374, 676. 46
Amount allotted by the Public Works Administration Emer-
gency Appropriation Act, fiscal year 1935 ----------       17, 360, 000. 00

         Balance available for fiscal year, 1935----------------                               21, 734, 676. 46

Amount (estimated) required to be appropriated for completion
                              -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
of existing project 1- - - -                                                                      85, 200, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1936 :
      For new work 1--------                                                                    35, 000, 000. 00
      For maintenance 1                                                                           1, 400, 000. 00
                                                                                          _---------------

         Total 1----------------------------------------                            --         36, 400, 000. 00
   2. OPERATING AND CARE OF CANAL, LOCKS, AND DAMS ON THE
                 MISSISSIPPI RIVER ABOVE THE MISSOURI RIVER

   The improvements fo'r which reports are made under this caption
form part of the project for improvement of the Mississippi River,
between the mouth of the Missouri River and Minneapolis, Minn.,
see pages 783 to 803, where general information regarding the im-
provement may be found.
   The completed locks and dams have been operated and maintained
under the permanent indefinite appropriation, at five locations, as
follows:
   The Twin City Lock and Dam, at Minneapolis (replacing Lock
and Dam No. 2 drowned out), since June 30, 1917. Due to the col-
lapse of the lower gate on August 19, 1929, it was deemed desirable
to replace the old lock with twin locks. The first of these was con-
structed with funds from the permanent indefinite appropriation
and was placed in operation September 11, 1930. The second was
constructed with maintenance and improvement funds and placed in
operation May 28, 1932.
   Hastings Lock and Dam, about 1 mile above Hastings, since July
1, 1930.
   Le Claire Canal and Lock, for the improvement of the upper 3.6
miles of the Rock Island Rapids, opened to navigation November
29, 1922.
   Moline Lock and Dam, near the foot of the Rock Island Rapids,
operated since December 23, 1907.
   Lock and Dam No. 15, at Rock Island, Ill., at the foot of the
Rock Island Rapids, opened to navigation August 16, 1933.
   Keokuk Lock and Drydock, submerging the Des Moines Rapids,
built by the Mississippi River Power Co., operated since June 13,
1913.
   Operations and results during fiscal year.--The locks and dams
were operated as required and the necessary repairs made thereto
and to the appurtenant structures.
   1 Exclusive    of available funds.
804        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

   The costs during the year were as follows: (St. Paul district),
$24,054.36 for operating and care; the expenditures were $19,133.81;
 (Rock Island district), $99,004.53 for operating and care; the ex-
penditures were $98,057.
   The total costs during the year (St. Paul and Rock Island dis-
tricts) were $123,058.89 for operating and care; the expenditures
were $117,190.81.
   Condeiton at end of fiscal year.-The above structures were in good
condition and in operation at the end of the fiscal year.
   The total cost to June 30, 1934, was $4,128,494.48, of which $2,-
778,936.70 was for operating and care and $1,349,557.78 for recon-
struction of lock system. The total expenditures were $4,138,479.90,
being $2,788,922.12 for operating and care and $1,349,557.78 for re-
construction of lock system.
   Proposed operations.-The locks, dams, and canal will be oper-
ated and maintained under allotments from appropriations made
available for such purposes.
                                      Cost and financial summary

Cost of maintenance to June 30, 1934----------------------$4, 128, 494. 48
Value of plant, materials, etc., on hand June 30, 1934___________ 13,370. 03

      Net total cost to June 30, 1934_______ ______________                                                  4, 141, 864. 51
Minus accounts payable June 30, 1934--________-....___                                                            3,384. 61

     Net total expenditures ----- ---------------                                               ----         4, 138, 479. 90
Unexpended balance June 30, 1934_.....                                                                           26, 846. 80

        Total amount appropriated to June 30, 1934-------------                                              4,165, 326. 70

   Fiscal year ending June 30            1930               1931               1932                  1933             1934


Cost ofnew w ork .-
Cost of maintenance
                                           -
                      .----------- $847,378.68
                                                - -   - -    - -   - -
                                                       $695, 237. 56
                                                                         - -    -
                                                                          $102,000.13
                                                                                      -   --   - -     - -
                                                                                                $78, 607. 21
                                                                                                             --    -----
                                                                                                                    $123, 058. 89

Total expended.....----------------    682, 873. 79     874, 933. 26       103, 645. 63          78, 826. 39         117, 190. 81
Allotted--_------------------- 1, 539, 650.00            31, 000.00        102, 000.00          108,436. 57           95, 227. 16


Balance unexpended July 1, 1933---------------------------           $48, 810. 45
Amount allotted front permanent indefinite appropriation, section 6,
River and Harbor Act, Mar. 3,1909_______ 1______          ____1     100, 300. 00

     Amount to be accounted for ____________________----_ 149, 110. 45
Deductions on account of impounded balances revoked--------_ 5,072. 84

       Net amount to be accounted for___                          _ 1_______---___
                                                                    144, 037. 61
Gross amount expended-------------------------        $126, 582. 11
Less:
    Reimbursements collected___----_--_-- $8, 351. 80
    Receipts from sales-----------------1, 039.50
                                                         9, 391.30
                                                                    117, 190. 81

      Balance unexpended June 30, 1934 _____-_____-------                                                          26,846. 80
Outstanding liabilities June 30, 1934______,______------- - --                                        __            4, 707. 81

         Balance available June 30, 1934__----------------                                      __.----            22, 138. 99
Amount allotted for fiscal year 1935 -------------------------                                                    134, 500. 00
         Balance available for fiscal year 1935 -------------------                                               156, 638. 99
         RIVERS AND     HARBORS-ROCK          ISLAND,   ILL., DISTRICT         805
  IMPROVEMENT OF RIVERS AND HARBORS IN THE
          ROCK ISLAND, ILL., DISTRICT
   The Rock Island district comprises the watershed of the Mississippi
River from the mouth of the Wisconsin River to Clarksville, Mo., a
distance of 3'08 miles, and includes locks at Keokuk, Rock Island,
Moline, and at Le Claire Canal; and also the Illinois and Mississippi
Canal. The district at one time extended frolm the mouth of the
Missouri River to Minneapolis, Minn., but that p.art above the mouth
of the Wisconsin River was transferred to the St. Paul district on
December 1, 1919, that part below the Illinois River was transferred
to the St. Louis district on August 1, 1928, and that part between
Clarksville, Mo., and the mouth of the Illinois River was transferred
to the St. Louis district on March 24, 1933.
   District engineer: Lt Col. Glen E. Edgerton, Corps of Engineers,
to August 31, 1933; Capt. J. M. Silkman, Corps of Engineers, acting
district engineer to September 22, 1933; and Maj. R. A. Wheeler,
Corps of Engineers, since that date.
   Division engineer: Col. George R. Spaulding, Corps of Engineers,
to November 27, 1933, and Lt. Col. E. L. Daley, Corps of Engineers,
since that date. Lt. Col. R. C. Moore, Corps of Engineers, acting
division engineer July 1, 1933, to July 28, 1933.
                                   IMPROVEMENTS

                                    Page                                       Page
1. Mississippi   River between             4. Operating and care of Illinois
    W i s c o n s i n River and                 and Mississippi Canal, Il _    807
    Clarksville, Mo __               783   5. Mill Creek and South Slough
2. Operating and care of locks                 at Milan, Ill ____________-     811
     and dams, etc., Mississippi           6. Examinations, surveys, and
    River between' Wisconsin                   contingencies (general) ___     812
    River and Clarksville, Mo_       803
3. Operating snag boats on
    upper Mississippi R i v e r
     and tributaries-----------      805

  1 and 2. For reports on these improvements see pages 783 and 803.
  3. OPERATING SNAGBOATS ON UPPER MISSISSIPPI RIVER AND
                       TRIBUTARIES

   Location.-That portion of the Mississippi River covered by snag-
boat operations extends from the mouth of the Missouri River to
the head of navigation at Washington Avenue Bridge, Minneapo-
lis, Minn. Snagboat operations extend up the Illinois River from
its mouth to La Salle, Ill., and to the improved or partially improved
portions of the Minnesota, St. Croix, Chippewa, Black, Galena, and
Rock Rivers.
   Existing project.-This provides for operating snagboats and re-
moving snags, wrecks, trees, and other obstructions, and such tem-
porary aid to navigation as may be proper and practicable in the
Mississippi River between the mouth of the Missouri River and
Minneapolis, 669 miles; in: the Illinois River between its mouth and
La Salle, 223 miles; and in the Minnesota, St. Croix, Chippewa,
Black, Galena, and Rock Rivers. These operations are prosecuted
under a permanent appropriation of not to exceed $25,000 annually.
806       REPORT OF CHIEF OF ENGINEERS,                                    U.   S. ARMY,              1934


  The existing project was adopted by the following river and har-
bor acts: The act of March 2, 1867, provided for the purchase and
operation of two dredge boats and snagboats on the upper Missis-
sippi River, and the act of August 11, 1888, provided for a perma-
nent annual appropriation for the work; the act of March 2, 1907,
added the Illinois River from its mouth to Copperas Creek to the
project; and the act of March 3, 1909, added the Minnesota River
and other tributaries of the upper Mississippi now or heretofore
improved by the United States, i. e., the Illinois River from Cop-
peras Creek to La Salle, and the Minnesota, St. Croix, Chippewa,
Black, Galena, and Rock Rivers. A map on a very small scale, in
three parts, is published in the Annual Report for 1914, pages
2448-2452 and 2454.
   Terminal facilities.-See reports on sections of the Mississippi
River above the Missouri.
   Operations and results during fiscal year.-All snagboat work
was performed by Engineer Department boats and the cost was paid
from funds allotted for "Maintenance and improvement of exist-
ing river and harbor works." The operations are therefore shown
under that caption.
   Condition at end of fiscal year.-The rivers were in good condi-
tion with respect to snags and other obstructions. The cost of snag-
boat work to June 30, 1934, was $1,559,685.90. The expenditures
were: From specific appropriations, $549,640; from annual appro-
priations authorized by act of August 11, 1888, $1,010,045.90. Total,
$1,559,685.90.
   Proposed operations.-Snags and other obstructions in the main
river and certain tributaries will be removed through occasional
use, when necessary, by Engineer Department                                                    plant normally
employed on other tasks.
                                          Cost and financial summary
Cost of maintenance to June 30, 19341------------------------                                          $1,559, 689.45

Net total expenditure 1---------------_______ __                                                         1, 559, 689. 45
Unexpended balance June 30, 1934_--                                                            _             12, 724. 22

Total amount appropriated to June 30, 1934 1-----------------                                           1, 572, 413. 67

        Fiscal year ending June 30                   1930           1931           1932              1933            1934


Cost of new work------------------.----.---------
Cost of maintenance..------------------$11, 520. 40              $14, 077. 35   $22, 604. 41 1 $12,307. 25             $15. 25

Total expended      .--                        _   11, 831. 15    12, 254. 95   23, 224. 95        13, 505. 56          15. 25

Allotted___   -------------------------            24, 785. 84    17, 489. 01    10, 797. 76       14, 025. 09     -2, 300. 16

1 Includes $3.55 account claim adjustment.

Balance unexpended July 1, 1933          ---------------------        039. 63
                                                                 $1---------5,                              $15,
Deductions on account of amount carried to surplus fund---------   2,300. 16

      Net amount to be accounted for_------------------------                                                    12, 739.47
Gross amount expended---------------------------------15.25

         Balance unexpended June 30, 1934----------------                                                        12, 724.22
   1Includes $3.55 account claim adjustment.
        RIVERS AND IIARBORS-ROCK       ISLAND, ILL.,   DISTRICT   807
4. OPERATING AND CARE OF ILLINOIS AND MISSISSIPPI CANAL, ILL.

   Location.-This canal connects the Illinois and Mississippi Rivers,
proceeding from a point on the Illinois River about 12 miles from
La Salle, across the State of Illinois to the Mississippi River at the
mouth of Rock River.
   Existing project.-This provides for the construction of a canal
from the Illinois River, near Bureau Junction, running westerly via
the Bureau Creek Valley to Rock River, near Colona, thence in the
bed of Rock River to the rapids near Milan, Ill., and thence to the
Mississippi River at the mouth of Rock River, at Rock Island, the
length of the main line being 75 miles. The feeder, 29.3 miles in
length, extends from Rock Falls on Rock River, to, the summit level
of the canal, about 28 miles from the Illinois River.
   There are 32 locks in the main canal, described in the following
tabulation. There is also a lock and controlling works at the head
of the feeder at Rock Falls, and a lock in Rock River at Rock Falls
connecting the pool of the Government dam with the power com-
pany's dam below. This lock has dimensions similar to those in the
main canal and cost $75,000.
   The estimate of cost for new work, revised in 1902 (H. Doc. No.
297, 57th Cong., 1st sess.), is $8,911,551.12. The cost of operation
and maintenance is payable from the permanent indefinite appropri-
ation for operating and care of canals.
   The existing project was adopted by the River and Harbor Act
of September 19, 1890 (H. Doc. No. 316, 51st Cong., 1st sess.).
   The latest published map is shown on page 2013 of Annual Report
for 1908.
   The River and Harbor Act of July 3, 1930, provided for the pay-
ment of $8,450.75 to the Mud Creek special drainage district for
work accomplished by the said district in reducing the maintenance
cost on the canal to the United States (H. Doc. No. 108, 70th Cong.,
1st sess.). The act also authorized the Secretary of War to expend
from funds appropriated and available for maintenance and im-
provement of existing river and harbor works the sum of $25,235 as
a contribution toward the relocation and reconstruction of the high-
way bridge across the Illinois and Mississippi Canal at Wyanet,
Bureau County, Ill., known as Bridge No. 10: Provided, That the
highway authorities of Bureau County, Ill., furnish assurances satis-
factory to the Secretary of War that they will reconstruct and main-
tain said bridge without further cost to the United States.
                                                Table showing important features of locks in Illinois and Mississippi Canal

                                                                    Length        Great-
                                                               Dis- of lock         est                      Depth      Depth
                                                              tance cham- Width
                                                                              of  length          Lift at    on up-
                                                                                                                          on
                                                                                                                        lower
                                                                                                                                                                   Year      Gates,                      Cost of
      Designation        Distance from nearest city           from  ber be-
                                                                            cham-  avail-          low       per sill   sill at        Foundation                  com-     material     Gates, kind      lock         'd
                                                           Illinois tween    ber able for         water      at low                                               pleted
                                                            River miter             full                     water       low
                                                                     sills        width                                 water
                                                                                                                                                                                                                ___    O

                                                              Miles    Feet     Feet     Feet      Feet       Feet       Feet
No.    1---------         Illinois River, 2,000 feet west_.    0.38   163. 08      35   143. 08       9.0      8.17        7.0    Sand and clay_ __---             1906    Wood----    Miter ...... $43, 263.04        Q
No. 2-                    At Bureau Junction .._ _.-___        1.25   163. 08      35   143. 08       9.0      8.17        7.0    Sand, clay, and gravel_          1906    ___do-----_ _ do ..... 43, 598. 60
N o. 3 ......--            2 mile west of Bureau Junc-         1.95   163. 08      35   143. 08       9.0      8.17        7.0    Quicksand and gravel_            1906    __do---------do-..... 40, 687. 10           L
                             tion.
N o. 4 ...........        214 miles west of Bureau Junc-       3.45      08
                                                                      163.         35   143. 08       9.0      8.17        7.0    Sand and gravel ......           1906    ___do.---------do-.....       39, 688.37
                             tion.                                                                                                                                                                                     0
No. 5 .          -------- 34 miles west of Bureau Junc-        4.60      08
                                                                      163.         35   143. 08      8. 0      8.17        7.0        do-
                                                                                                                                  -....           ----        -    1906      do
                                                                                                                                                                             --.        S.. do ..--      40, 596. 20
                             tion.
No. 6 ..-            ---- 5 miles west of Bureau Junc-         6.50   163. 08      35   143. 08     10. O0     8.17        7.0  Sand, hardpan, and                 1906    __do--         ...do. .       42, 944. 48   LJ
                             tion.                                                                                               gravel.
N o. 7 ..--        ----- 3 m iles east of Tiskilwa --..        7.20   163.08       35   143.08       8.0       8.17        7. O Loam and sand -_..                 1906 ___do...... .. do . . . 37, 347. 55
No.8        -----         2 miles east of Tiskilwa .-----      8.20   163.92       35   149.75       8.0       8.17        7.0 ___do ------------                  1906    do-..-        Marshall       36, 930.86     5
                                                                                                                                                                                          and miter.
No. 9- --------          1 miles east of Tiskilw a ....      8.50     163.92      35    149. 75      8. O0     8.17        7. O0 Clay _-__--                       1906    do-- - _-- do.---            32, 747.89
No. 10      ---------    At Tiskilwa----------------        10. 30    163.92      35    149. 75      9.0       8.17        7. O0 Sand and gravel-.....             1906    do--         . .. do._       34, 549. 94
No.    11 ......--       1 mile west of Tiskilwa- --....    11. 10    163. 92     35    149. 75      9.0       8.17        7. O0....
                                                                                                                                ..... do----------------
                                                                                                                                      do_                          1906 ___do --.         .... do --    37, 154. 43
N o.   12 .....    ----- 134 miles west of Tiskilwa __..    11. 60    163.92      35    149. 75      8.0       8.17        7. O0_--__ do __- --         --         1906                 .. do._-        36, 476. 36
No.    13 ......    -.-  3 miles west of Tiskilwa ____--    12. 35    163. 92     35    149. 75     10. O0     8.17        7. O0 Loam and clay -------             1906 _do..--                         32, 869. 11
N o.   14 ..........     3 miles east of Wyanet.. --..      13. 25    163. 92     35    149.75      10. O0     8.17        7. O0 Sand and gravel -----             1906 ___do--             -- do --- -
                                                                                                                                                                                           dodo_--      31, 972.98         r
No.    15- ---------    234  miles east of W yanet .....
       16----------- 2 miles east of Wyanet .......
                                                            13. 80
                                                            14. 00
                                                                      163.92      35
                                                                                  35
                                                                                        149. 75     10.O
                                                                                                    11.
                                                                                                               8.17        7. O0 --. do____------------
                                                                                                                           8. O0 Loam, clay, and sand_
                                                                                                                                                                   1906
                                                                                                                                                                   1906
                                                                                                                                                                                               do-      30, 324.44
No.                                                                   163.92            149. 75                8.17                                                        do       --     ..do.. . . 34, 607. 85
No. 17                   13 miles east of Wyanet ---        14. 30    163.92      35    149. 75     10. 0      8.17        7. O0 Sand and gravel ------            1906    do ...          . do......   32, 975. 11
N o. 18 ..........       1 mile east of Wyanet ........     15. 20    163. 92     35    149. 75      9. O0     8.17        7. O0 Clay and gravel _.....            1906 ___do .--           ..do . . . 35, 901. 29
No. 19 ...-----          At Wyanet ___________              16. 10    163. 92     35    149. 75     10. O0     8.17        7. O0 Sand and gravel .-...             1906
                                                                                                                                                                        ___do     - ---    ..do . . 34,     620. 29
No. 20 --------          1 mile west of Wyanet       -..    17. 10    163. 92     35    149.75      11.        8.17        7. O0 Loam, clay, and sand_             1906                                 38, 292. 39
No. 21 .. ------- 1% miles west of Wyanet ....__            17. 40    163. 92     35    149. 75     11.0       8.17        8. O0 .do___------------                1906 ___do..- ---- ....d o ..... 39, 632. 51        02
                                                                                                                                                                         ___do..----    Miter . ..
Guard lock ---2 29 miles north main-line canal_ 57. 00                168. 75     35    149. 00     (1)        8.30        6.5    Limestone ---     -----          1906 ___do _--                       32, 712. 57
RockRiverLock@ At Rock Falls, Ill ____________              57. 13    163. 17     35    143. 08     (1)        8.47        6.6     - do-                           1912                 - ...do         75, 605. 01
N o. 22 ..........       13 miles west of Wyanet......      28. 80    163.08      35    143. 08      9. O0     8.17        7. O0 Clay _...............             1906  ___do-------      . .do -.     41, 863, 97
No. 23 ..-......         10 miles east of Geneseo ......    38. 30    163.08      35    143.08      11. O0     8.17        7. O0 ---- do                           1906 ___do------       ..  .do .  .  41, 356.46
N o. 24 ---------- At Geneseo___                            48.30     163. 08     35    143. 08     11. O0     8.17        7. O0 Clay and gravel .----             1906 -_do.----                       47, 034. 32
No. 25 ..------ -        51 miles west of Geneseo ___-      53. 75    163. 08     35    143. 08      8. O0     8.17        7. O0 Sand__----              --        1906 ___do ------                    40, 479. 10
N o. 26 ...------                                   __
                         5 miles east of Colona .. ___      54. 70    163. 08     35    143. 08      9. O0     8.17        7. O0 ----- do ---------------          1906 ___do....-.. ...       do..... 40, 404. 75
No. 27.--- .--- 21% miles east of Colona _        --        57. 00    163. 08     35    143. 08      8. O0     8.17        7. O0 Gravel__                          1906 ___do.....--   - ... do._ .
                                                                                                                                                                                                        39, 077. 16
No, 28.__          ..... At Colona--        .-------------- 59. 50    163. 08     35    143. 08      8. O0     8.17        7. O0 Rock ................             1906 __.do.....--                    30, 786. 53
No.   29_____.    -  2% miles west of Colona-..        61. 90   163. 08     35   143.08     11. 0   8. 17     7.0 ____do_-------             1906   _do-o--                  -
                                                                                                                                                                             ...   36, 631. 54
No.   30___------__  1~ miles east of Milan _      _   70. 20   168. 75     35   149. 00     0. 0   7. 00     7. 0 Rock, etc., hardpan..     1894   ___do          --
                                                                                                                                                              ___---.. do- ...     71, 588. 00
No.   31      ______ 1 mile west of Milan   ___        72. 90   165. 42     35   145. 42     6. 0   7. 17     7. 0 Clay and gravel-          1894   ___do--_        _-----do-.     38, 711. 44
No.   32 ___________
              ...    3 miles west of Milan ___.. .     75. 00   163. 08     35   143. 08   12. 00    8. 0     7.0     .do- .... __-     _    1894   ___do ...-------_.do   .....   85,468. 31

      1 Variable.
   2 Rock River Lock is on Rock River at Rock Falls, Ill.       It is located in the south end of the Sterling Dam and about 600 feet below the guard lock of the Illinois and Mississippi
Canal (feeder section).
    NOTE.-There are no dams except at the guard lock and Lock 30. At the former locality there is a fixed dam across the Rock River, with a movable crest constructed of wood,
concrete, and steel; at Lock 30 there are crib dams across the north and south channels of Rock River. The north dam has a 60-foot opening and has been superseded by a concrete
power dam a short distance below; the south dam adjoining Lock 30 has been reinforced with concrete laid in the water.




                                                                                                                                                                                                 O

                                                                                                                                                                                                 0
                                                                                                                                                                                                 Q




                                                                                                                                                                                                 tj
810           REPORT OF CHIEF OF ENGINEERS,                                    U.      S.   ARMY,        1934

  Local cooperation.-Fully complied with.
  Terminal facilities.-None.
   Operations and results during fiscal year.-The work done during
the fiscal year consisted in removing deposits of mud from canal
prism, aqueducts, seep ditches, and creek channels; repairs to locks,
bridges, buildings, and telephone lines; and painting houses, bridges,
and floating plant. Canal banks were riprapped where necessary.
During the fiscal year 1934 the canal was open to navigation 275
days. The cost of operation was $147,687.65. Expenditures were
$135,829.32.
  Condition at end of fiscal year.-All locks (33 in number), dams,
aqueducts, buildings, and other appurtenances are in fair condition.
The channel has an existing depth of approximately 7 feet, a bottom
width of 52 feet, and a water surface width of 80 feet, except at
aqueducts where the width is 40 feet and at locks 35 feet. The cost
of operation and care of the canal to June 30, 1934, was $3,947,106.11.
The total costs and expenditures under the existing project for the
construction of the canal were $7,580,143.41. The amount expended
from the permanent indefinite appropriation to June 30, 1934, was
$3,968,047.91.
  Proposed operations.-The canal will be operated and maintained
under allotments from appropriations made available for such
purposes.
                                       Cost and financial suummary
                              MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934----------------------------                                             $7, 580,    143.      41
Total cost of permanent work to June 30, 1934_______________                                               7, 580,    143.      41
Net total expenditures-----------------------------------                                                  7, 580,    143.      41
Total amount appropriated to June 30, 1934_________________                                                7, 580',   143.      41

            Fiscal year ending June 30                     1930         1931            1932            1933            1934


Cost of new work                  ..------------------------------   $33, 685. 75
Cost of maintenance------------------------------------------------------                                         ----------
Total expended          .                                              8,450. 75    $25, 235. 00   -      _       - -          --

Allotted.                              -                              33, 685. 75 --                             -....-----


                                       OPERATING             AND, CARE FUNDS

Cost of maintenance to June 30, 1934___.___          1_____                                        __     $3, 947, 106. 11
Value of plant, materials, etc., on hand June 30, 1934                              -----------                25, 981. 67

                                           --
      Net total cost to June 30, 1934 _______________-                                             ___ 3, 973, 087. 78
Plus accounts receivable June 30, 1934_ ________-___--                                              -___         8. 65

     Gross total costs to June 30, 1934--------------------- 3, 973, 096. 43
Minus accounts payable June 30, 1934______________ ______ -  -    5, 048. 52

     Net total expenditures _____   ___                                    _________--__                   3, 968, 047. 91
Unexpended balance June 30, 1934- _______-                                  __--___-___                        29, 309. 21
        Total amount appropriated to June 30, 1934 ------------                                            3, 997, 357. 12
                  RIVERS AND HARBORS--ROOK ISLAND, ILL., DISTRICT                                                                811

            Fiscal year ending June 30                           1930           1931           1932           1933            1934

Cost of new work---------------------          -    - -
Cost of maintenance----------------- $170, 006. 53 $176, 749. 93 $217, 035. 77 $167, 957. 26                               $147, 687. 65

                              .....
Total expended---...-------------------                       172, 668. 29   190, 331. 18   197, 218. 87   183, 101. 64     135, 829. 32

Allotted------................---------......-----------...   177, 500. 00   185, 740. 00   213, 000. 00   175, 356. 05     139, 323. 54



Balance unexpended July 1, 1933__________------------------         $25, 814. 99
Amount allotted from permanent indefinite appropriation, section 6,
River and Harbor Act, Mar. 3, 1909------------------------         152, 000. 00

      Amount to be accounted for_____________
                                   -----------                                                                        177, 814.99
Deductions on account of revocation of impounded balances-..__.-                                                       12, 676. 46

      Net amount to be accounted for__________________________ 165, 138.53
Gross amount expended___________________________        $139, 015. 01
Less:
    Reimbursements collected____________    $2, 213. 08
     Receipts from sales_______________-___     972. 61
                                                                                                       3, 185. 69
                                                                                                                      135, 829. 32

      Balance unexpended June 30, 1934             -------                                                                29, 309. 21
Outstanding liabilities June 30, 1934______________________________                                                        5, 096. 82
     Balance available June 30, 1934___________________________  24, 212. 39
Accounts receivable June 30, 1934_-- -______--
                                      _______--
                                              -_____                   8. 65
Amount allotted for fiscal year 1935___________________________ 146, 000. 00

             Balance available for fiscal year 1935______________________ 170, 221. 04

                   5. MILL CREEK AND SOUTH SLOUGH AT MILAN, ILL.

   Location.-Mill Creek empties into South Slough about 1 mile
east of the town of Milan, Ill., and 6.5 miles above the mouth of
South Slough, which empties into the Mississippi River.
   Previous projects.-Adopted by the act of January 21, 1927. The
costs and expenditures amounted to $85.24. (For further details
see p. 1132, Annual Report for 1932.)
   Existing project.-This provides for floodgates in the walls of
the canal, or other devices for carrying the flood waters of Mill
Creek across the canal right-of-way into Rock River; for the con-
struction of a levee on the east bank of Mill Creek extending from
the Chicago, Rock Island & Pacific Railroad to the canal embank-
ment; for the construction of a levee on the west bank of Mill
Creek and its extension in a westerly direction to a connection with
Water Street at the point E, shown on map in project document; and
for the removal of obstructions in Mill Creek and South Slough,
at an estimated cost of $87,500 for new work and $2,000 annually
for maintenance.
   The project was adopted by the River and Harbor Act approved
July 3, 1930 (Rivers and Harbors Committee Doc. No. 19, 71st Cong.,
2d sess.). The latest published map is in the project document.
   Terminal facilities.-None.
   Operations and resuzlts during fiscal year.-The work done con-
sisted of the removal of debris from the spillways and creek chan-
812           REPORT          OF CHIEF OF ENGINEERS, U.                                S.       ARMY,          1934


nel. The cost and expenditures were $1,102.34 all of which was
maintenance.
  Condition at end of fiscal year.--The existing project was coin-
pleted in 1933. At the end of the fiscal year the project was in good
condition. The total cost under the existing project to June 30, 1934,
was $64,735.92, of which $63,633.58 was for new work and $1,102.34
was for maintenance. The expenditures were $64,735.92.
  Proposed operations.-The balance unexpended July 1, 1934 will
be applied to minor dredging and snagging to maintain channel.
   The additional sum of $2,000 can be profitably expended during
the fiscal year 1936 to be applied to minor dredging and snagging
as needed.
                                         Cost and financial summary

                                           -
Cost of new work to June 30, 1934_ __________--                                             -        ______ $63, 718. 82
Cost of maintenance to June 30, 1934____    ____---                                                           1, 102. 34

          Total cost of permanent work to June 30, 1934__-_____--                                                     64, 821.   16
Net total expenditures-- -------------------                                                    -------               64, 821. 16
Unexpended balance June 30, 1934_____      --                                            ____-______                   2, 897. 66

          Total amount appropriated to June 30, 1934---------------67, 718. 82

          Fiscal year ending June 30                         1930         1931           1932                 1933        1934


Cost of new work __._ _------                     ...------------....   $9, 368. 33   $52,111.16       $2,154. 09         -__-__----
Cost of maintenance---...------ --------------- ------------------- --------------------                                 $1, 102. 34
Total expended_______----------------------------                   _    4, 531.05     53, 308. 85       5, 793. 68       1, 102. 34
Allotted---------..................-----------------.....------------   87, 500. 00 ------            23, 866. 42         4, 000. 00


Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934------------------------------                   $2, 000. 00
Amount allotted from War Department Appropriation Act approved
Mar. 4, 1933---------------------       ---------------        2, 000. 00

      Amount to be accounted for____________                                           _______                         4, 000. 00
Gross amount expended ___----------------------------                                                                  1, 102. 34

           Balance unexpended June 30, 1934--.....------------                                       __----            2, 897.66

Amount that can be profitably expended in fiscal year ending June
                             - - - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- -
30, 1936, for maintenance                                                           2, 000. 00

     6. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                         (GENERAL)

  The cost of work during the year amounted to $22,936.49; the ex-
penditures were $23,172.67. The balance unexpended June 30, 1934,
together with accounts receivable will be applied as needed during
the fiscal year 1935 to payment of expenses incurred in connection
with the above items. The additional sum of $36,000 can be profit-
ably expended during the fiscal year ending June 30, 1936.
    1Exclusive      of available funds.
            RIVERS AND HARBORS-ROCK ISLAND,                                                    ILL., DISTRICT                          813
                                        Cost and financial summary
Cost of maintenance to June 30, 1934_..     ________-    ____-                                                     __ $57, 439. 05
Plus accounts receivable June 30, 1934 _...______- ____
                                                      --     -                                                    -____- -  32.24
     Gross total costs to June 30, 1934_-__    ___----_______                                                                  57, 471. 29
Minus accounts payable June 30, 1934_...... _______--____ _-                                                                     -_ 69.40
     Net total expenditures --------------------------------                                                                   57, 401. 89
Unexpended balance June 30, 1934---------------------------                                                                    35, 343. 52
         Total amount appropriated to June 30, 1934_.--------------                                                            92, 745. 41

         Fiscal year ending June 30                      1930               1931                1932                1933           1934


Cost of new work.. .. ..---.------
Cost of maintenance.- ------------------- $1, 573. 30                     $4, 233.89      $12, 241.07           $16, 060. 36     $22, 936. 49
Total expended......-----------------------             1, 573. 30         3, 894. 88         12, 220. 03        16, 147. 07      23, 172. 67
Allotted_-----_-----        -------------------         7, 000. 00        10, 000. 00 .........------------ 49, 297. 23           24, 948. 18


Balance unexpended July 1, 1933__------------------------------ $33, 568. 01
Amount allotted from War Department Appropriation Act approved
  Mar. 4, 1933            ____________________________           5_____
                                                                 56, 000. 00
     Amount to be accounted for__________________________                                                                      89, 568.01
Deductions on account of revocation of allotment and impounded
funds     ------------------------------------------------                                                                    31, 051. 82
      Net amount to be accounted for_____________________                                                                      58, 516. 19
Gross amount expended     _______________------------------------- $27, 087.42
Less reimbursements collected______________________                  3, 914. 75
                                                                                                                               23, 172. 67
      Balance unexpended June 30, 1934---------------------                                                                    35, 343. 52
Outstanding liabilities June 30, 1934__________________________                                                                    593. 58
      Balance available June 30, 1934_________________________   34, 749. 94
Accounts receivable June 30, 1934.________________________-    -__    32.24
         Unobligated balance available June 30, 1934_______-______                                                             34, 782. 18
Amount that can be profitably expended in fiscal year ending June
                            - -- - - - -- - - - - - - - -- -- -- - - - - - -
30, 1936, for maintenance                                                   _                                                 36, 000. 00

Status of reports called for by river and larbor acts and committee resolutions

        Locality                    Authorization act        Transmitted
                                                             toCongress                       Document no.                 Recommenda-
                                                                                                                           Recommenda-


Illinois and Mississippi     River and Harbor
   Canal, Ill., from Bu-      Act, July 3, 1930.
   reau Junction on the
   Illinois River to Rock
   Island on the Missis-
   sippi River.
Mississippi River be-        Rivers and Harbors              Mar. 8,1934            Rivers and Harbors                     Favorable.
   tween Missouri River        Committee resolu-                                      Committee, 34, 73d
  and Minneapolis,             tion Jan. 29, 1932.                                    Cong., 2d sess.
   seepage.
Rock River, Ill., from       River and Harbor                Oct.         2,1933         ___.-------------------- Unfavorable.
   Rockford to the Illi-       Act, July 3, 1930.
   nois and Mississippi
   Canal, near Sterling.
Rock River, Ill., and        ....    do-_......                      do      _ _.    -----.      .          .     ...            Do.
  Wis., from Janesville
  to Rockford.

  1Exclusive       of available funds.
814       REPORT       OF    CHIEF        OF ENGINEERS,                U.   S.    ARMY,      1934


IMPROVEMENT OF RIVERS AND HARBORS IN THE ST.
            PAUL, MINN., DISTRICT
   This district includes the Mississippi River and its tributaries from
its source to and including the Wisconsin River; Red River of the
North, Minn. and N. Dak., and its tributaries; and those waters in
North Dakota north of the Missouri River watershed.
   On July 31, 1919, the international boundary waters in Minnesota
which flow toward Hudson Bay, prior to that date included in this
district, were transferred to the Duluth, Minn., district.
   On December 1, 1919, the Mississippi River between the mouth of
the Wisconsin River and Minneapolis, Minn., formerly a part of the
Rock Island, Ill., district, was transferred to this district.
   On February 7, 1930, the Wisconsin River, formerly included in
the Milwaukee, Wis., district, was transferred to this district.
   District engineer: Maj. Dwight F. Johns, Corps of Engineers.
   Division engineer: Col. George R. Spalding, Corps of Engineers,
to November 27, 1933, and Lt. Col. Edmund L. Daley, Corps of Engi-
neers, since that date. Lt. Col. R. C. Moore, Corps of Engineers,
acting division engineer, July 1 to July 28, 1933.
                                             IMPRO VMENTS

                                               Page                                                        Page
1. Mississippi River between                              5. Gaging Mississippi River and
     mouth of Wisconsin River                                  its tributaries, at or near
    and Minneapolis, Minn___                     783           St. Paul, Minn___________                    818
2. Operating and care of locks                            6. St. Croix River, Wis. and
     and dams on the Missis-                                      Minn _-                                   819
     sippi River between the                              7. Examinations, surveys, and
     Wisconsin River and Min-                                 contingencies (general)__                     821
    neapolis, Minn                               803      8. Other projects for which no
3. Reservoirs at headwaters of                                estimates are submitted__                     821
    Mississippi River_________                   814
4. Operating and care of reser-
     voirs at headwaters of Mis-
    sissippi River ____________                  817
   1 and 2. For reports on these improvements see pages 783 and 803.
       3. RESERVOIRS             AT HEADWATERS                    OF MISSISSIPPI RIVER

  Location.--  Reservoirs are located on the Mississippi River and
several of its tributaries, in Itasca, Beltrami, Hubbard, Aitkin, Cass,
and Crow Wing Counties, Minn., as follows:

                                                       Outlet                                       Area
       Name of reservoir                                                          Water-
                                                River                  Above
                                                                       St. Paul    shed     Original     Reser-
                                                                                             lake         voir

                                                                 Miles            Sq. miles Sq. miles   Sq. miles
Winnibigoshish--___.....-       __ Mississippi----   ____________   408               1,442      117        179. 4
Leech Lake__----_______         __ Leech. _____________-__          410               1, 163     173        250. 9
Pokegama---....------ ---          Mississippi__-...       _______  344                  660      24         35. O
Sandy Lake__ ___-           -_____ Sandy----------------------       267                 421        8        16. 6
Pine River_           -            Pine        __-----------------------
                                                                     199                 562       18        23.7
Gull Lake........Gull                     ----------------------- 168                    287       20        20. 5
           RIVERS AND HARBORS-ST.                PAUL, MINN.,            DISTRICT

   Previous project.-Adopted by the River and Harbor Act of June
14, 1880. The cost and expenditures on the original project were
$782,662.10-$681,805 being for new work and $100,857.10 for main-
tenance of such reservoirs as were completed prior to 1894. These
expenditures wvere prior to the adoption of the existing project in
1899. For further details see page 1888 of the Annual Report for
1915.
   Existing project.-This provides for the reconstruction of the five
original reservoir dams, viz, Winnibigoshish, Leech Lake, Poke-
gama, Sandy Lake, and Pine River, and the construction of Gull
Lake Reservoir. The estimated cost, revised in 1928, exclusive of
amount expended on previous projects, is $895,000. The above dams
are of solid concrete construction, Pokegama being built on bedrock
and the others on pile foundations. The Sandy Lake Dam includes
a lock 160 feet long, 30 feet wide, with a maximum lift of 9.5 feet
and a depth of 2.5 feet on the lower sill at low water. The construc-
tion of an equalizing canal between Winnibigoshish and Leech Lake
Reservoirs, at an estimated cost of $61,200 (later increased to
$71,200), was subsequently added to the project, but no work was
done, and this part of the project was abandoned in the River and
Harbor Act of March 4, 1915. The abandonment of the ditches to
connect Long Lake to Round Lake and Round Lake to Gull Lake was
recommended in House Document No. 413, Sixty-fourth Congress,
first session, and was ordered by Congress in the River and Harbor
Act of July 27, 1916. The maintenance of the reservoirs is provided
for by annual allotments from the indefinite appropriation for
"operating and care of canals and other works of navigation."
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1899, provided for the reconstruc-
tion of 4 of the 5 original dams and surveys to determine the
extent of lands overflowed by the reservoirs; the act of March 2,
1907, provided for the reconstruction of Sandy Lake Dam and the
construction of Gull Lake Reservoir; the act of June 25, 1910, pro-
vided for the construction of an equalizing canal between Winnibi-
goshish and Leech Lake Reservoirs (H. Doc. No. 363, 61st Cong.,
2d sess.), but this part of the project was abandoned in the River and
Harbor Act of March 4, 1915. For maps see pages 1973 and 1978 of
Annual Report for 1911.
    Upper and lower operating limits authorized by regulations approved
                              Feb. 11, 1931

                       Maximum
                        stage      Minimum                                   Maximum     Minimum
                                     stage                                    stage        stage

Winnibigoshish___.__ -    14. 20       6. 00   Sandy      ________              11. 00       7. 00
Leech Lake_____________..  5. 24       1. 00                   -
                                               Pine ____________.-----          15. 00       9. 00
Pokegama______ _________12. 00         6. 00   Gull          _-          _       7. 00       5. 00



  Local cooperation.-Complied with.
  Terminal facilities.-There is at Cohasset one small privately
owned dock, which is also open to the public, and is used for dock-
ing launches and outboard motor boats.
       91536-ENG 1934-52
816           REPORT OF CHIEF OF ENGINEERS,                                    U.   S.         ARMY,        1934

   Operation and results during fiscal year.-None.
   Condition at end of fiscal year.-The project is 99 percent com-
pleted, the only work remaining to be done being the acquisition of
flowage rights on a number of tracts around the reservoirs.
   The five dams originally built of timber have been reconstructed
of concrete. A concrete dam has been constructed at Gull Lake.
Three dikes at Winnibigoshish, 4 at Pokegama, 2 at Sandy Lake,
and 16 at Pine River have been constructed. Flowage rights have
been acquired on practically all lands affected by the construction,
maintenance, and operation of the reservoirs.

                                                                            Previous projects               Existing projects

                      Reservoir                          Capacity                              Cost                        Cost
                                                                             eed          (approxi-            mdt (approxi-
                                                                           pleted          mate)           pleted    mate)

                                                         Cubic feet
W inn ib igosh ish .___
                      _.___ __. . . . . __. . . . .    43, 430, 000, 000    1884            $214, 000       1900           $154, 200
Leech Lake_____                -                       33, 230, 000, 000    1884             171, 805       1902             75, 000
PFokegma_____                                           5, 260, 000, 000    1884              85, 000       1904            112, 000
Sandy Lake______________________________                3, 160, 000, 000    1895             114, 000       1909            104, 000
Pine River                                              7, 730, 000, 000    1886              97, 000       1907            118, 500
Gull Lake                                               3, 090, 000, 000       -    -                       1913             77, 200
       Total___ ____________________________           95, 900, 000, 000   __                  681, 805     -.-
                                                                                                            ____            640, 900



  The total costs and expenditures to June 30, 1934, were $884,604.17,
being $880,139.35 for new work and $4,464.82 for maintenance.
  Proposed operations.-The balance unexpended at the end of the
year will be applied as follows:
Payment of such awards as may be made in the pending proceedings
  for the acquisition of flowage rights---------------------------$16, 000. 00
Balance remaining -------------------------------------------- 20, 112. 14

         Total----                 _------------------- ----------------------------                                  36, 112. 14
  No additional funds can be profitably expended during the fiscal
year 1936.
                                        Cost and financial sunmary

Cost of new work to June 30, 1934--------------------------- $1, 561, 944. 35
Cost of maintenance to June 30, 1934--------------------------   105, 321. 92

         Total cost of permanent work to June 30, 1934----------                                             1, 667, 266. 27

Net total expenditures---------- ----------------------------                                                    , 667, 266. 27
Unexpended balance June 30, 1934_       ------------------                                                          36, 112. 14

         Total amount appropriated to June 30, 1934------------                                              1, 703, 378. 41


         Fiscal year ending June 30                   1930          1931                1932              1933             1934


Cost of new work ___---------------------_$3, 417. 94               $325. 26 -------------              $55
Cost of maintenance ______________   _____ .. __                  4, 459. 42       $5. 40 .........-----    ....---------....-----

      Total cost___-----------------------        3, 417. 94      4, 784. 68               5.40                  55    .
Total expended_---_....    ------                 3, 417.94       4, 621. 70             168. 38                 55--.-.
Allotted- -----................------          ------------.------------------------------
               RIVERS AND                 HARBORS-ST.                         PAUL,         MINN.,              DISTRICT                      817
Balance unexpended July 1, 1933_________________________----------                                                               $36, 112.14
Balance unexpended June 30, 1934__________________                                                         __                       36, 112. 14

4. OPERATING AND CARE OF RESERVOIRS                                                               AT HEADWATERS                                OF
                    MISSISSIPPI RIVER

  The improvement for which report is made under this caption
forms part of the project for reservoirs at headwaters of Mississippi
River. See page 814, where general information can be found. The
completed reservoirs have, been operated and maintained under the
permanent indefinite appropriation since February 1, 1895.
   Operations and results during fiscal year.--The reservoirs were
operated and maintained. A new bridge was erected over Winni-
bigoshish Dam. Considerable work was done improving the bridge
over Leech Lake Dam and in sealing of the apron at Lake Winni-
bigoshish Dam. Minor repairs and improvements were made to the
appurtenant structures and grounds.
                                Mean monthly stages for the fiscal year

                                                 1933                                                              1934
    Reservoir

                       July     Aug.      Sept.       Oct.        Nov.        Dec.      Jan.       Feb.     Mar.        Apr.        May       June


Winnibigoshish_         2. 64     2. 11    1. 68        1. 39       1. 38       1. 42     1.45     1. 46      1. 49      1. 60        1. 69     1. 88
Leech Lake-_              .30   -. 16     -. 53       -. 74       -. 68       -. 62     -. 54     -. 43     -. 33       -. 17       -. 03      -. 04
Pokegama------......    7. 48     6. 38    5. 92       5. 12        4. 82      4. 72      4. 75    4. 77      4. 84      5. 02        5. 16     4. 92
Sandy Lake----.         9. 20     8. 84    8. 54       7. 83        7. 37      7.13       7. 22    7. 06      7.14       8. 04        8. 47     8. 52
Pine River-....        14.05    13. 37    13.04       12. 29      11.85       11. 68    11. 54    11.51     11. 53      11.56       11.55      11.49
Gull Lake..------       6. 51     6. 20    5. 94        5. 57       5. 55      5. 71      5. 80    5. 67      5. 54      5. 22        5.12      5.16



   The costs for the year were $48,385.56. The expenditures were
$46,179.79.
   Condition at end of fiscal year.-All reservoirs and appurtenances
were in good condition. The total costs to June 30, 1934, were
$944,293.95. The total expenditures were $942,024.78.
  Proposed operations.-The reservoirs will be operated and main-
tained under allotments from appropriations made available for such
purposes.
                                            Cost and financial summnary
Cost of maintenance to June 30, 1934___________________________ $944, 293. 95
Minus accounts payable June 30, 1934 ----------------------------  2, 269. 17
   Net total expenditures------------------------------------                                                                    942, 024. 78
Unexpended balance June 30, 1934______________________________                                                                     3, 524. 66
          Total amount appropriated to June 30, 1934_____________                                                                945, 549. 44

          Fiscal year ending June 30                              1930               1931            1932               1933              1934


Cost of new work .----------------------------
Cost of maintenance.......----------------                   $17, 391. 73       $22, 404. 55      $18, 127. 57    $12, 103. 74         $48, 385. 56
Total expended__                   .--------------------        16, 732. 79      22, 500. 15       16,093. 47         14, 130. 39        46, 179. 79
Allotted_-       ------------------------
                    -    __                                     16, 000. 00      22, 000. 00       17, 500. 00        14, 850. 68        45, 398.35
 818              REPORT     OF       CHIEF            OF ENGINEERS,              U.        S.     ARMY,     1934

Balance unexpended July 1, 1933-----------------------------_       $4, 306. 10
Amount allotted from permanent indefinite appropriation, section 6,
  River and Harbor Act, Mar. 3, 1909                                 46, 350. 00
             Amount to be accounted for-_                                                                        __ 50; 656. 10
Deductions on account of revocation of impounded funds----------                                                          951. 65
             Net amount to be accounted for__--                                    ----                  _____ 49, 704. 45
Gross amount expended _-.--                            $46, 305.71
Less reimbursements collected-------------------------      125. 92
                                                                                                                       46, 179. 79
       Balance unexpended June 30, 1934--------------------------3, 524. 66
Outstanding liabilities June 30, 1934 --------------------------- 3, 081. 16
      Balance available June 30, 1934__                                       -----------                                  443. 50
Amount allotted for fiscal year 1935 __-                                               -------                        24, 000. 00

             Balance available for fiscal year 1935                                                                        443. 50
                                                                                                                       2----------------------4,

5. GAGING MISSISSIPPI RIVER AND ITS TRIBUTARIES                                                           AT OR NEAR
                                                   ST. PAUL, MINN.

    The improvement for which report is made under this caption
forms part of the project for gaging the waters of the Mississippi
River and its tributaries. The work carried on is the establishment,
maintenance, and reading of gages at or near St. Paul, Minn. Gages
have been maintained under annual allotments from the appropria-
tion provided for in joint resolution of February 21, 1871, and modi-
fied by section 6 of River and Harbor Act of August 11, 1888, and
section 9 of River and Harbor Act of June 13, 1902.
    Operations and results during fiscal year.-Gages were read at
Montevideo and Mankato on the Minnesota River, during the fiscal
year. The costs and expenditures were $260.
    Condition at end of fiscal year.-Gages have been established,
read, and maintained at various points on the, Mississippi River and
its tributaries in the vicinity of St. Paul. The total costs and ex-
penditures to June 30, 1934, were $13,991.31.
    Proposed operations.-The reading and maintenance of gages in
the Mississippi River at St. Paul and vicinity, and in the Minne-
sota River at Montevideo and Mankato will be continued.
                                          Cost and financial summary

Cost of maintenance to June 30, 1934---------------------------$13, 991.31

Net total expenditures----------------------------------------- 13, 991. 31
Total amount appropriated to June 30, 1934 ____----------------13, 991. 31

           Fiscal year ending June 30                     1930         1931                 1932          1933             1934


Cost of new work---------------
Cost of maintenance----------------------                    $350        $350                     $350       $249                 $260

Total expended---------------------------                        350      350                      350           249               260

Allotted-------.....    ..--------------------------             350      350                      350           249               260
         RIVERS AND HARBORS-ST.         PAUL,   MINN.,   DISTRICT     819
Amount allotted from River and Harbor Act approved June 13,
  1902-------------------           ---------------------------- $350'.00
Deductions on account of revocation of allotment------------------- 90. 00

      Net amount to be accounted for _--                            260.00
Gross amount expended _ -----------------------------------
                              _                                     260. 00
                 6. ST. CROIX RIVER, WIS. AND MINN.

   Location.-The source of the river is in northwestern Wisconsin.
It is about 160 miles long and for its greater part forms the bound-
ary between Wisconsin and Minnesota. It flows southwesterly and
then southerly into the Mississippi River at Prescott, Wis., 29.5
miles below the Omaha Bridge, St. Paul, Minn. The portion in-
cluded in this improvement extends from the mouth to Taylors
Falls, a distance of 52.3 miles. (See U. S. Geological Survey map
of Minnesota, scale 1: 500,000, for general location.)
   Existing project.-This provides for a channel 200 feet wide and
6 feet deep at low water between the mouth and Stillwater (24 miles)
and a channel 3 feet deep at mean low water between Stillwater and
Taylors Falls (28 miles), also the improvement of the harbor and
water front at Stillwater. The ordinary fluctuations between mean
low and mean high water are about 7.5 feet at Osceola and about
17.8 feet at Stillwater. The estimate of cost of new work, revised
in 1927, is $150,400. The latest (1927) approved estimate for annual
cost of maintenance is $3,000.
   The existing project was authorized by the following river and
harbor acts: The act of June 18, 1878, provided for dredging, etc.,
for a 3-foot channel between the mouth and Taylors Falls (H. Doc.
No. 75, pt. 6, 43d Cong., 2d sess.); the act of June 3, 1896, provided
for the harbor and water front at Stillwater; and the act of January
21, 1927, provided for the 6-foot channel to Stillwater (H. Doc. No.
378, 69th Cong., 1st sess.).
   The latest printed map is in House Document No. 1008, Sixty-
fourth Congress, first session.
   Recommended modifications of project. Under date of December
15, 1931, the Chief of Engineers recommended modification of the
existing project so as to provide for the maintenance of a channel 9
feet deep and of suitable width from the mouth to Stillwater at an
estimated cost of $5,000 annually, in connection with the improve-
ment of the upper Mississippi River to afford a depth of 9 feet (H.
Doc. No. 184, 72d Cong., 1st sess.).
   Terminal facilities.-At Stillwater there is a concrete-paved levee,
550 feet long and 40 feet wide, sloping from the top of the river bank
to the water. There is also a piling and timber trestle wharf on the
right bank, of which 276 feet is dock and 96 feet approach. At
other points along the river, landings are made on the banks.
   Operations and results during fiscal year.-Maintenance channel
dredging was done at the mouth of Kinnikinnic River by hired labor
and the use of Government plant, the length of cuts aggregating 3,170
feet. A total of 65,262 cubic yards of sand and gravel was removed.
A total of 1,007 snags was removed from the river from Taylors
Falls to the mouth by hired labor and Government plant. The costs
and expenditures during the year were $8,980, all for maintenance.
820           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                        1934

   Condition at end of fiscal year.-The project was completed in
1930.        The maximum draft that could be carried June 30, 1934, was
1 foot at low water of 1933 above Stillwater and 5 feet at low
water of 1933 between Stillwater and the mouth. The total costs
and expenditures were $209,386, being $150,409.50 for new work and
$58,976.50 for maintenance.
  Proposed operations.-The balance unexpended will be applied as
follows:
Maintenance dredging between Stillwater and mouth of river, by
hired labor and Government plant, as navigation needs require__ $2, 300. 00
Removal of snags between Taylors Falls and Stillwater, by hired
labor and Government plant (Aug. and Sept. 1934)                 1,018. 11              ------------
           Total--------                     -------------------                -----------------                        3, 318. 11
   The additional amount of $3,000 can be profitably expended dur-
ing the fiscal year 1936, in maintenance dredging between Stillwater
and mouth of river, by hired labor and Government plant, as naviga-
tion needs require.
                                              Cost and financial summary

Cost of new work to June 30, 1934_-----___----      __-_-----                                                      $150, 409 50
Cost of maintenance to June 30, 1934------------------------                                                         58, 976. 50
           Total cost of permanent work to June 30, 1934                               -----------                  209, 386. 00
Net total expenditures_-----------------__   __--______ 209, 386. 00
Unexpended balance June 30, 1934------------------------------ 3, 318. 11
           Total amount appropriated to June 30, 1934 ____--                                                         212, 704. 11
                                                                                                                   -___

           Fiscal year ending June 30                         1930       1931            1932               1933            1934

Cost of new work--------                                 $11, 014. 78
                                                       ------------             --------------------------------
Cost of maintenance-----            -        ---           ...--.--
                                                             ---    $1, 460. 69      $11, 737. 48        $3, 942.83          980. 00
                                                                                                                           $8,
Total expended__------------------------11, 226. 42                       842. 54       8, 872. 98         7,425. 48        8, 980. 00
Allotted     -----------------------------                  3,000. 00   5, 500. 00      5, 000. 00         4, 982. 59      10, 956. 52


Balance unexpended July 1, 1933           -----------            $1, 341. 59
Amount allotted from War Department Appropriation Act
approved Apr. 26, 1934-------------------------- $3, 000.00
Amount allotted from War Department Appropriation Act
  approved Mar. 4, 1933_--    11 -    -------         8, 000. 00
                                                                 11, 000. 00

     Amount to be accounted for                                        341. 59
                                                                   1----------------------------2
Deductions on account of revocation of impounded funds_-----------       43. 48
      Net amount to be accounted for------------------------                                                            12, 298. 11
Gross amount expended           ---------------------------------                                                        8, 980. 00
           Balance unexpended June 30, 1934_________________________                                                    3, 318. 11
Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1__-             __--                                                                         3, 000.00
  1 Exclusive of available funds.
                  RIVERS AND HARBORS-ST.                                            PAUL, MINN., DISTRICT                                           821

    7. EXAMINATIONS,                        SURVEYS,                    AND CONTINGENCIES                                      (GENERAL)
  The cost of work during the year was $66,763.35; the expenditures
$64,130.17. The balance unexpended June 30, 1934, will be applied
as needed to payment of expenses to be incurred in connection with
the above items.
  The additional sum of $35,000 can be profitably expended during
the fiscal year ending June 30, 1936.
                                              Cost and financial summary
Cost of maintenance to June 30, 1934_--------------------------- $164, 845. 07
Value of plant, materials, etc., on hand June 30, 1934------------  1, 972. 71

      Net total cost to June 30, 1934----------------------__                                                                             166, 817. 78
Minus accounts payable June 30, 1934---------------------------                                                                             3, 934.34

     Net total expenditures ----------------------------------                                                                            162, 883. 44
Unexpended balance June 30, 1934-------------------------------                                                                            36, 584.31

           Total amount appropriated to June 30, 1934--------------- 199, 467. 75

           Fiscal year ending June 30                                 1930                 1931              1932              1933               1934


Cost of new work        -----------...............                    ..........................                            .................
Cost of maintenance----...................--------------         $5, 801. 24          $25, 831. 15        $29, 327. 24     $36, 631. 32         $66, 763. 35
Total expended ---                       _--------------------    5, 490. 53           26, 198. 39         30, 141. 32      36, 432. 26          64, 130. 17

Allotted--- ----------------------------                         23, 000. 00           36, 500. 00          3, 000. 00     109, 620. 11          25, 847. 64


Balance unexpended July 1, 1933_------------------------------ $74, 866.84
Amount allotted from War Department Appropriation Act approved
    Mar.      4, 1933                             __----
                                                      -------------                                                                         30, 000.00

      Amount to be accounted for-----------------------------     104, 866. 84
Deductions on account of revocation of impounded funds------------ 4, 152. 36

       Net amount to be accounted for ----------------------     ___     100, 714. 48
Gross amount expended-----------------------------$82, 613.12
Less reimbursements collected ______                         18, 482. 95
                                                                          64. 130. 17
      Balance unexpended June 30, 1934                                                                                                     36, 584. 31
Outstanding liabilities June 30, 1934------------------------__                                                                              , 581.15

           Balance available June 30, 1934                                                  -----------                                    31, 003. 16

Amount that can be profitably expended in fiscal year ending June
   30, 1936, for maintenance 1                                        -.-..----.------------                                               35, 000. 00
                    8. Other projects for which no estimates are submitted
                          [Commercial statistics for these projects are given in pt. 2 of report]

                                                                               For last            Cost and expenditures to                 Estimated
                                                                             full report                June 30, 1934 1                     Estimated
                       Name of project                                         see An-                                                      amount re-
                                                                              nual Re-                                                       quired to
                                                                               port for            New work         Maintenance              complete

Minnesota River, Minn....---------------------                                    1933             $130, 273. 48         $23, 555. 18       Completed.

1 This includes an unpaid claim of $18.88.

    No commerce, channels adequate for pleasure craft.
   1Exclusive of available funds.
822           REPORT OF          CHIEF OF ENGINEERS,                         U.       S.   ARMVIY,   1934

Status of reports called for by river and hlarbor acts and committee resolutions

                               Authorization act           Transmitted
                                                           to Congress                 Doc. no.        Recommenda
           Locality


Minnesota River, Minn_ River         and    Harbor         Oct.    2, 1933        -        -------     Unfavorable.
                               Act, July 3, 1930.
Mississippi River, from   -.    Do ...-- ._.-----             do                                            Do.
Brainerd to Minneap-
olis, Minn.
Mississippi River from    Rivers and Harbors
Missouri River to          Committee resolu-
Minneapolis.               tion, July 27, 1934.
Mouse River, N. Dak.      Flood Control Act,
 (survey for flood con-     Feb. 27, 1931.
  trol).


   IMPROVEMENT OF RIVERS AND HARBORS IN THE
                 MISSOURI RIVER DIVISION
   The improvement of the Missouri River above Hermann, Mo.
 (about mile 97 1), was under the jurisdiction of the Kansas City,
Mo., district, upper Mississippi Valley division, until October 27,
1933, when the Missouri River division was organized with juris-
diction over this section. The Missouri River division is divided
as follows: Kansas City, Mo., district, Hermann, Mo. (about mile
97), to mouth of Nodaway River; Omaha, Nebr., district, organized
January 2, 1934, mouth Nodaway River (about mile 482 1) to mouth
Yellowstone River; and Fort Peck, Mont., district, organized De-
cember 1, 1933, above the mouth of the Yellowstone River (about
mile 1,690 2).
    The improvement of that section of the Missouri River from
its mouth to Hermann, Mo., is under the jurisdiction of the St.
Louis district, upper Mississippi Valley division.
    District engineers: At Kansas City, Mo., Capt. Theodore Wyman,
Jr., Corps of Engineers, to January 2, 1934, and First Lt. O. E.
Walsh, Corps of Engineers, since that date. At St. Louis, Mo.,
Maj. W. A. Snow, Corps of Engineers, to December 1, 1933, and
Capt. B. M. Harloe, Corps of Engineers, since that date. At Omaha,
Nebr., Capt. J. M. Young, Corps of Engineers, since January 2,
1934. At Glasgow, Mont., Maj. T. B. Larkin, Corps of Engineers,
since November 21, 1933.
    Division engineers: At Kansas City, Mo., Lt. Col. R. C. Moore,
Corps of Engineers, since October 27, 1933. At St. Louis, Mo.,
Lt. Col. R. C. Moore, Corps of Engineers, acting until July 28,
1933; Col. George R. Spalding, Corps of Engineers, until November
27, 1933, and Lt. Col. E. L. Daley, Corps of Engineers, since that
date.
                                               IMPROVEMENTS

                                                    Page                                                          Page
1. Missouri River, Kansas City                                5. Osage River, Mo----------                        846
    to mouth__________ ___                          823       6. Operating and care of Lock
2. Missouri River, Kansas City                                    and Dam No. 1, Osage
    to Sioux City, Iowa _____                       832            River_-------------------_                     847
3. Missouri River, Sioux City,                                7. Examinations, surveys, and
     Iowa, to Fort       Benton,                                   contingencies (general) ___                    848
     Mont____-----------                            839       8. Other projects for which no
4. Missouri River at Fort Peck,                                   estimates are submitted__                       850
     Mont -----------                               841
  1 All mileage is 1932 channel mileage above the mouth unless otherwise designated.
  21890 channel mileage.
          RIVERS AND HARBORS--MISSOURI        RIVER DIVISION        823,
                            MISSOURI RIVER

  Location.-The Jefferson, Madison, and Gallatin Rivers conjoin
at Three Forks, Mont., to form the Missouri River, which flows
southeasterly 2,473 miles across or along 7 States to the Mississippi
River, 17 miles above St. Louis. For description see page 1149,
Annual Report for 1932.
         1. MISSOURI RIVER, KANSAS CITY TO THE MOUTH

   Location.-See preceding paragraph. Practically the entire
length is contained within the State of Missouri.
   Previous projects.-The first appropriation for improvement by
regulation was made in the River and Harbor Act of June 18, 1878.
The original plan for comprehensive improvement was adopted by
the River and Harbor Act of August 2, 1882, modified by River
and Harbor Acts of July 5, 1884, September 19, 1890, and June 13,
1902.
   The cost and expenditures on all projects prior to that of 1912 were
$7,663,130.48, distributed as follows: Prior to project of 1902, $6,970,-
510.57 for new work and maintenance; subsequent to project of 1902,
$289,592.82 for new work, and $403,027.09 for maintenance. For
details of previous projects see page 1891 of Annual Report for 1915.
   Existing project.-This provides for securing a permanent naviga-
ble channel with a minimum low-water depth of 6 feet and a mini-
mum width of 200 feet, with a reasonable additional width around
the bends, by means of bank revetment, permeable dikes to contract
and stabilize the waterway, removal of snags, and occasional dredg-
ing. Ordinary and extreme fluctuations of stage are 16 and 38 feet,
respectively.
   The estimate of cost for new work, revised in 1934, is $69,000,000,
exclusive of amounts expended on previous projects. The estimated
cost for annual maintenance is $2,000,000.
   The existing project was adopted by the River and Harbor Act of
July 25, 1912 (H. Doc. No. 1287, 61st Cong., 3d sess.), and modified
by the River and Harbor Act of August 8, 1917, which fixed the up-
stream limit of the improvement at the upper end of Quindaro Bend,
388 miles from the mouth, and providing for dredging (H. Doc. No.
463, 64th Cong., 1st sess.) ; and the River and Harbor Act of March 3,
1925, provided for a minimum width of 200 feet. For latest pub-
lished map see page 2876 of Annual Report for 1919.
   Recommended modifications of project.-Under date of October 3,.
1933, it was recommended to Congress that the project for naviga-
tion on the main stem of the Missouri River as heretofore authorized,
namely, from the mouth to Sioux City, be vigorously pressed to coin-
pletion, and that, in addition, the reservoir at the site of Fort Peck
be built to the maximum practicable capacity, and be operated
primarily for navigation, with such arrangement for future instal-
lation of power as will permit the maximum production of hydro-
electric power consistent with the primary demands of navigation
and for these purposes an authorized expenditure of $145,000,000
be authorized, together with the maintenance that may be found
824    REPORT OF    CHIEF   OF ENGINEERS,   U.   S.   ARMY,   1934


necessary. (H. Doc. No. 238, 73d Cong., 2d sess.) Partially included
in the Public Works program.
   Local cooperation.-The project provides that cooperation from
benefited localities may be required, in case a comprehensive plan is
adopted by Congress for an apportionment of expense, where any
improvement confers special benefit; and receipt of contributions
from private parties, to be expended with Government funds upon
authorized works where such would be in the interest of navigation,
is authorized by the River and Harbor Act of March 4, 1915. The
Secretary of War has approved the general principle of cooperative
construction on the Missouri River below Kansas City on the basis
that 25 percent of the cost of any special installation shall be paid
by the United States and 75 percent by the local interests.
   The total amount contributed by local interests in cooperation with
the United States from 1918 to June 30, 1934, was $665,662.80, of
which $8,647.11 was returned to contributors. Contributed funds
.expended during the fiscal year amounted to $4,000.
   Work done by private interests for the benefit of the public was
as follows:
   Kansas City, Kans., mile 385, right bank, 1,000 cubic yards of old
concrete and stone were used to repair the bank and an old stone
intake pier was removed, at a cost of $520 to the city of Kansas City,
Kans., and approximately $5,950 to the Civil Works Administration.
   Randolph Bend, mile 373, left bank, 385 cubic yards of riprap
stone paving were placed and brush and drift removed, at a total
cost of $1,280 to the Wabash Railway Co.
   Missouri City, Mo., mile 350, left bank, 143 squares of wire and
brush mattress, 65 cubic yards of riprap stone paving and 20 cubic
yards of stone ballast were used to, repair the revetment, at a total
cost of $5,605 to the Wabash Railway Co.
   DeWitt Bend, mile 258, left bank, 35 cubic yards of riprap stone
were used to repair revetment, at a total cost of $105, to the Wabash
Railway Co.
   Rocheport Reach, mile 185, left bank, 6,173 cubic yards of riprap
stone were used to protect 795 feet of bank, at a total cost of $8,789
to the Missouri, Kansas, Texas Railroad Co.
   Howard Bend, mile 36.5, right bank, 174 linear feet of steel-sheet,
pile sea wall were constructed and 3,600 cubic yards of earth and stone
were removed from the river, to protect and improve the St. Louis
water works intake. The total cost to the city of St. Louis, Mo., was
$8,331.36.
   Terminal facilities.-At Kansas City, Mo., a municipal terminal
consists of a reinforced concrete and brick warehouse and offices
 (300 by 85 feet); a machine shop (30 by 30 feet); and a loading
platform. There is a total floor space of 25,500 square feet. About
400 feet downstream there is a bulk-handling dock consisting of a
250-foot timber pile railroad trestle and a concrete loading platform.
A second municipal terminal at the foot of Main Street consists of a
steel and stucco warehouse (306 by 40 feet) and a reinforced con-
crete loading platform (180 by 48 feet).
    Miami has a two-story brick warehouse (50 by 80 feet) in fair con-
dition, and a frame warehouse (40 by 60 feet) in poor condition.
          RIVERS AND    HARBORSV-MISSOURI      RIVER DIVISION        825
  Hermann has two municipal warehouses and two elevators.
  The foregoing terminals are adequate for existing needs.

             OPERATIONS AND RESULTS DURING FISCAL YEAR

   Kansas City to Hermann, Mo.-New work completed during the
year with Government funds consisted of 127 dikes totaling 77,277
linear feet and 11 pieces of revetment totaling 22,109 linear feet. In
addition to completed work, there are in process of construction under
contract and by hired labor, 6 dikes to total about 8,716 linear feet
and 5 pieces of revetment to total about 25,075 linear feet. Mainte-
nance and repairs were made to 16,890 linear feet of dikes, 34,438
linear feet of revetment, 200 linear feet of retards and 3,000 linear
feet of levee. Snagging operations resulted in the removal of 310
snags, 95 piles, 4 drift heaps, 3 barges, 1 shanty boat, 2 retards, and
8 boulders; cutting of 28 trees from along the bank; and the lower-
ing of 1 mattress. Dredging operations consisted of the removal of
19,965,731 cubic yards from 74 localities by the U. S. dredges, Clark,
Lewis, St. Paul, and McGregor at a cost of $341,231.99, all charged
to new work. Unallocated surveys amounted to $21,257.10. The
total cost of channel marking during the year amounted to $36,971.49.
Plant construction during the year by the Kansas City District con-
sisted of two 210-horsepower diesel towboats, Patrick Gass and John
Ordway (for Fort Peck district), 3 launches, 1 mattress barge, and
56 skiffs, all by hired labor. The following is under construction:
Dredges William M. Black and William S. Mitchell, attendant pon-
ton pipe lines, 6 launches (for Fort Peck district) by contract, and 4
fuel oil barges and 2 launches by hired labor. New boilers were
installed on the dredged McGregor. The radio communication sys-
tem was enlarged by the addition of 1 land and 8 floating stations.
    The cost of new work was $3,627,715.31 ($1,855,320.91 from Public
Works funds and $1,772,394.40 from regular funds), and the cost of
maintenance was $281,215.34, a total of $3,908,930.65. The expendi-
tures during the fiscal year amounted to $4,768,553.36, of which
 $1,692,274.58 were Public Works funds and $3,076,278.78 were regular
funds.
    Hermann, Mo., to the mouth.-New work completed during the
year with Government funds consisted of 107 dikes totaling 52,480
linear feet and 13 pieces of revetment, 24,200 linear feet. In addition
to completed work, there are under construction by contract 13 dikes
to total about 5,665 linear feet and 2 pieces of revetment to total about
4,225 linear feet.
    Of the above work, 94 dikes totaling 46,225 linear feet and 9 pieces
of revetment totaling 14,685 linear feet were built with Public Works
funds. All the work now under construction is being done with
Public Works funds.
  Snagging operations resulted in removal of 143 snags from the
channel, the cost of which, $10,506.19, is charged to maintenance.
Dredging operations resulting in an average gain of 7.5 feet in chan-
nel depth, consisted of the removal of 7,180,550 cubic yards of mate-
rial from 52 localities by the U. S. dredges Dundee, Clark, Ste. Gene-
826    REPORT   OF   CHIEF OF ENGINEERS,      U.   S.   ARMY,   193

vieve, Thebes, Fort Chartres, and Potter, and the leased dredges
Vulcan and Baltimore II, at a cost of $271,561.04, of which $73,875.87
was for contract dredging and the balance for operation of United
States dredges, all charged to maintenance. Hydrographic surveys
were made covering 94 miles of river. The cost of surveys and gages
was $19,206.35, charged to maintenance.
   The cost of new work was $1,844,394.81, of which $1,439,510.26 was
paid from Public Works funds and $404,884.55 from regular funds,
and the cost of maintenance was $386,877.92, a total cost of $2,231,-
272.73. The expenditures during the fiscal year amounted to $2,009,-
710.14 of which $1,215,870.74 was from Public Works funds and
$793,839.40 from regular funds.
   Kansas City to the mouth.-The total cost of work during the fiscal
year on both sections was $6,140,203.38, of which $5,472,110.12
($3,294,831.17 Public Works funds and $2,177,278.95 regular funds),
was for new work and $668,093.26 for maintenance. The total ex-
penditures were $6,778,263.50, including $2,908,145.32 from Public
Works funds. For expenditures by local interests see paragraph
Local cooperation.
   Condition at end of fiscal year.-Under the existing project, be-
ginning with the appropriation of June 25, 1910, for systematic work
on the 6-foot channel, the work for a completely controlled and
regulated river is about 95 percent completed, based on 1934 estimate.
The work accomplished includes 824,968 linear feet of revetment and
five revetment spillways for the purpose of permanently fixing the
banks; 1,474,204 linear feet of pile dikes, 35,842 linear feet of retards,
16,561 linear feet of levee, and 28,500 linear feet of abatis for stabil-
ization of channel widths and closing of auxiliary chutes; and the
removal of 45,962,308 cubic yards of material dredged from the
channel to obtain channel depths.
   Of the 388 miles of river within the project, 376 miles are regarded
as substantially completed and 12 miles as partially completed.
   From the opening of navigation early in March to the close of
August, the ruling depth generally fluctuates between 4 and 11 feet
above mean low water. A low-water season of 3 months succeeds
 (to Dec. 1) with river stage about ordinary low water, during which
period a dependable channel depth of 6 feet or greater is maintained
when the discharge at Kansas City, Mo., is greater than 20,000 cubic
feet per second. When the discharge at Kansas City falls below
2.0,000 cubic feet per second, the channel depths in partially im-
proved sections may not exceed 5 feet. Dredging is required at low
stages to remove temporary shoals and maintain the required channel
depth for navigation.
   The total cost for Kansas City to Hermann, Mo., under the exist-
ing project is $56,116,020.74, of which $48,621,761.80 was for new
work and $7,494,258.94 for maintenance. The total expenditures
were $58,607,264.82.
   The total cost for Hermann, Mo., to the mouth, under the existing
project, was $16,323,464.23 of which $14,547,286.94 was for new work
and $1,776,177.29 for maintenance. The total expenditures were
$16,099,824.71.
                RIVERS             AND       HARBORS-MISSOURI                       RIVER DIVISION                                           827

   The net total expenditures under the existing project, beginning
with the appropriation of June 25, 1910, for systematic work on the
6-foot channel amounts to $74,707,089.53, including $2,908,145.32 from
Public Works funds. The cost of new work is $63,169,048.74, in-
eluding $3,294,831.17 from Public Works funds, and the cost of
maintenance is $9,270,436.23, a total of $72,439,484.97. For expen-
ditures by local interests, see paragraph Local cooperation.
   Proposed operations.--The balance unexpended ($1,636,967.87)
and accounts receivable ($19;660.79), at the end of the year, to-
gether with an allotment of $844,600 made during July 1934 will be
applied as follows:

                                                                    Estimated     Kansas City          Hermann,
                                                                   date of com-     to Her-             Mo., to                    Total
                                                                     pletion      mann, Mo.             mouth


Accounts payable June 30, 1934-                  -            --             ___ $266, 515. 67         -    -       -_        $266, 515. 67
New work (channel-contraction and bank-
protection work by dike and revetment con-
struction):
   By contract:
        Sheeps Nose and Berlin Bends .........Nov. 30, 1934                         157, 791. 71   -------------...............
        W ilhoite Bend-       -_....do          .. do---                            281, 353. 98   ---.................
        Little Missouri and Glasgow Bends .........-do......                        177, 559. 61                                   - -
        Marion,    Burlington,      and Stanley
          Bends .-- .--          - . ._
                     . ....------.--                do-                              75, 305. 30 -------------...............
   By hired labor: Teteseau and Thomas
     Bends ----------------                         do-                              97, 387. 52   .                          .
      Total new work                 _-___           -              -               789, 398. 12 -------             -----         789, 398. 12
IMaintenance by hired labor:
    Maintenance and repair of existing works _ June 30, 1935                        127, 814. 87           $121,    000         248, 814.             87
    Snagging operations .--------------------        do .---                         20, 000. 00             15,    000           35, 000.            00
    Project dimensions of channel by dredging-..... do..-...                        600, 000. 00            536,    500       1, 136, 500.            00
    Surveys, gages, and studies -                 .- do -----                              0. 00             25,    000           25, 000.            00
                                     -      ----.
       Total maintenance .---.---------------                             --- -     747, 814. 87                697, 500      1, 445, 314. 87
       Total for all work-     -      ___              _
                                                -----------                  -    1, 803,728.66                 697, 500      2, 501, 228. 66



  The balance unexpended ($2,051,854.68) from funds provided un-
der the provisions of the National Industrial Recovery Act, and
accounts receivable ($44.70), together with an allotment of $1,736,000
made during July 1934, will be applied as follows:

                                                                    Estimated     Kansas City          Hermann,
                                                                   date of com-     to Her-             Mo., to                        Total
                                                                     pletion      mann, Mo.             mouth


Accounts payable        .------------------------------------                      $138,178.
                                                                                           53          $223, 639. 52           $361, 818. 05
New work:
   Uncompleted contracts:
      Camden to Baltimore Bends, dikes .... July 31, 1934                     86, 173. 59 ----------.....
      Waverly to Malta Bends, dikes --               Aug. 30, 1934             58,788.  63    -
      Rocheport Reach to Plow Boy Bend,
        dikes.------------------------      .......  July 31,1934              67,696.85
      Providence and Sandy Hook Bends,
        dikes and revetments_                        Oct. 30,1934              90, 115. 13
      Chamois Bend to McGirks Island
        Reach, dikes and revetments_        -_....July 31, 1934              118, 220. 82                 - -                 --       __
      Amazon Bend, dikes__---------------            June 30, 1935                 -- .     . 45, 010.                   71                  -
      Bellefontaine Reach, dikes  -------------          do------------_            -------- 44, 037.                    45             --       --
      St. Charles Reach, dikes.             --------------
                                                         do -------    --------------             13, 697.               58        -             -
      Lower Pelican Bend, revetment        ...---------- do ----.-                 _---.-.....32, 331.
                                                                                   .                                     00
          Bonhomme Bend, revetment- --........
                                            _         -
                                               . do-....                                                     137. 00
                                                                                                           82,
          New Haven, Pinckney, and Bates
           Island Bends, dikes and revetment _   do------ --------------                                   34, 448. 66             -
828         REPORT          OF       CHIEF OF ENGINEERS, U.                                      S.   ARMVIY,                   1934


                                                                  Estimated              Kansas City            Hermann,
                                                                 date of com-              to Her-               Mo., to                       Total
                                                                   pletion               mann, Mo.               mouth


New work-Continued.
   Uncompleted contracts-Continued.
      Weldon Springs Bend, dikes and revet-
        ment___                              June 30, 1935                                                        $22, 200. 07
      Washington Reach, dikes and revet-
        ment     ._   -          --   __    --- do___                                                               48, 253.07
      Spring House Bend, dikes and revet-
        ment ___-     --     -              -- _ _do _-                                                             38, 374. 20
          Total existing contracts .............                                          $420, 995. 02           360, 489.74               $781,484. 76


   Extension of existing contracts: Waverly
    to Malta Bends, dikes -        __
                                    --                           Nov. 30, 1934               58, 000. 00      -----                   .        58, 000. 00
   Proposed contracts:
       Kansas River Bend, dikes 1,500 feet ---     June 30, 1935                             45, 000. 00    ............................
       Liberty and Blue Mills Bends, dikes,
         1,100 feet.---                                  do                                  65, 000. 00
       Lexington Reach, revetment, 1,600
         feet.
       DeWitt Bend to Euphrase Bend,
         dikes, 6,765 feet- - _....     ------------. do ......                            202, 950. 00
       Boonville Reach, dikes, 3,870 feet ..-..     -. do ....                             116, 100. 00
       Rocheport Reach to Lupus Reach:
            Dikes, 5,500 feet-      -       -         ...d o .......
            Revetment, 2,100 feet-                 --- do ......
                                                                      }                    208, 800. 00
       Providence Bend to Eureka Bend,
         dikes, 4,570 feet_                              do -. ..                          137, 100. 00
       Cote Sans Dessein Bend to Isbell
         Reach, dikes, 2,870 feet_-          ----     __do ----
                                                              _                              86, 100. 00
       Pelican and Mullanphy Islands, dikes
         and revetment_                               __do --- _-_                                                118, 052. 00
       Bonhomme Island, dikes _............       ----.  do ....---                                                62, 029. 00
       Howard Bend to St. Albans, dikes and
         revetment ___      -         -     _      ----. do .....-.                                                 72, 121. 50            -- - - - - -
       Washington, dikes and revetment ....-          .. do . . .                                                   89, 149. 50
       Marthasville-New Haven, dikes and
         revetment ___-                           ...--- do     -   -                                       - 103, 081.00
       Bates Island-Berger Bottom, dikes- .-      .....  d o .......                                          124, 569.50
          Total proposed contracts ....--
                                       ---                                                 861,050. 00            569, 002. 50             1, 430,   052. 50,

   New work by hired labor:
      Dredging, for shaping the channel to
        the desired alignment.      --     -                 Nov. 30, 1934
      Lexington Reach -_         __                                                         10,000.00 _-----------      .. .............
      Tabo Bend- ...            -        -                    __-do ------.                 15,950. 00 ----- -- --           .....       .....
      Wilhoite Bend----_-         .    -     -                  _do .......                 27, 000. 00 .------ -----... . .. . .. . .
      Glasgow Bend _--__                                        _do ------                  54, 000.00 -
      Burlington and Stanley Bends ........                      d o ------
                                                             .....                          10, 000. 00 ........... . -------. . .
      Pelican Bend, revetment-.. _       -
                                                             -
                                                                _do
                                                                  -- ---. -.
                                                                     Ao---      --   -
                                                                                                                  130000.00
                                                                                                                   3, 000. 00              ---
          Total proposed hired labor work -                                                116,950. 00            130, 000.00                246,950.00
          Total new work                                   I
                                      _.....------------ -----.......                    1, 456, 995. 02     1,059, 492. 24                2, 516,487. 26

Plant:
   2 34-inch pipe-line dredges (contract)....... Oct. 30,1934  687,579.39...........................
    Pontons and pipe line for above dredges
       (contract) -   - . . -- - - __-- - - Aug. 30,1934        36, 460. 66 ---- ----------. ---.........
   4 oil barges, 2 launches, and equipment for
      dredges (hired labor) ---   -........      .. do.....--- 114,511.82 .
                                                                                                  83,5.83                                             ,55.8
      Total plant._ ---        - -     __---
                                         -- -- -- --                   ..........          838, 551.87                                       838,551.87
   Balance remaining-.........        .. -.........-.              ..........               70, 044. 70                    997. 50            71, 042. 20
      Total all work-------..............---.....                .......             .   2, 503,770. 12 1, 284,129. 26                     3, 787, 899. 38
                          --
                RIVERS AND              HARBORS-MISSOURI                       RIVER DIVISION                            829

  The additional sum of $4,261,598 can be profitably expended dur-
ing the fiscal year ending June 30, 1936, as follows :

                                                                                  Kansas            ermann,
                                                                                      ityermann,
                                                                                        to  Mo.,to                   Total
                                                                                Hermann,            mouth
                                                                                  Mo.

New work (July 1, 1935, to June 30, 1936), channel, contraction and
bank-protection work by dike and revetment construction: By
          __...------- ------------------
  contract_                                        ---------------------              $902,000    $1,500,000        $2,402,000
Maintenance (July 1, 1935, to June 30, 1936), by hired labor:
   Maintenance and repair of existing works.....__------------ ___ _                  400, 000        245, 000         645, 000
   Snagging operations_-------------------------------------                           30, 000         15, 000          45, 000
   Project dimensions of channel by dredging (by hired labor) ...                     579, 598        500, 000       1, 079, 598
   Surveys, gages, and studies__------------------------------                         50, 000         40, 000           90, 000
      Total maintenance__------------------           ________             -      1, 059, 598         800,000        1, 859, 598
      Total for all work..........____-
                                   ......                _--------
                                                      __-..-....                  1,961, 598        2, 300, 000      4, 261, 598


                                        Cost and financial sunmary
                               MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934__------------------__                                            -_ $67, 134, 320. 96
Cost of maintenance to June 30, 1934_--
                                    .---       __----                                            -__--- 9,673, 463.32
      Total cost of permanent work to June 30, 1934.--------                                               76, 807, 784.28
Value of plant, materials, etc., on hand June 30, 1934- .-------                                            2,901, 145. 29
      Net total cost to June 30, 1934---------------------- 79, 708, 929. 57
Plus accounts receivable June 30, 1934.---------__ ---------
                                                          __     19, 660. 79
      Gross total costs to June 30, 1934-- -
                                       ............    ___ 79, 728, 590. 36
Minus accounts payable June 30, 1934------------------------   266, 515. 67
     Net total expenditures_-__----------------------                                               _79,       462, 074. 69
Unexpended balance June 30, 1934------------------------                                                    1, 636, 967. 87
         Total amount appropriated to June 30, 1934 ----                                _______            81, 099, 042. 56

  Fiscal year ending             1930               1931                1932                 1933
        June 30                                                                                                     1934


Cost of new work- ...       $13, 819, 854. 64   $9,694,631.02      $6,769,662.   95      $8,350,995.71         $2,177,278.95
Cost of maintenance___        1, 785, 691. 68    1, 331, 820. 97    2, 090, 293. 21         811, 188. 38          668, 093. 26
      Total cost-..... 15, 605, 546. 32         11, 026, 451. 99    8, 859, 956. 16       9, 162, 184.09          2, 845, 372. 21
Total expended-...._         14, 041, 498. 84   10, 916, 775. 76    9,499,  29
                                                                         153.             9, 208, 311. 07         3, 870, 118. 18
Allotted-- ------------      14, 390, 000. 00   14, 614, 245. 70    2, 668, 600. 00       7, 874, 672. 44         3, 342, 973. 24


Balance unexpended July 1, 1933____        _------------------------- $2,164, 112. 81
Amount allotted from War Department Appropria-
  tion Act approved Feb. 23, 1931____________         $883, 822. 67
Amount allotted from War Department Appropria-
  tion Act approved Apr. 26, 1934 ______-   ___         697, 500. 00
Amount allotted from War Department Appropria-
  tion Act approved July 14, 1932____________           656, 000. 00
Amount allotted from Emergency Relief and Con-
  struction Act approved Mar. 4, 1933________       1,217, 975. 76
                                                                       3, 455, 298. 43
          Amount to be accounted for__                     __-       _______ -___-__                        5,619, 411. 24
830            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                             1934

Deductions on account of revocation of:
   Allotment -----------------------------------
                                _                                                             $15, 298. 97
   Impounded funds_____________________________                                                97, 026. 22
                                                                                                                      $112, 325. 19

      Net amount to be accounted for_________________________                                                        5, 507, 086. 05
Gross amount expended_______________________ $4, 585, 921.20
Less:
    Reimbursements collected------ $703, 205. 28
     Receipts from sales ------------  12, 597. 74
                                                    715, 803. 02
                                                                                                                     3, 870, 118. 18
      Balance unexpended June 30, 1934 _______________-        _                                                     1, 636, 967. 87
Outstanding liabilities June 30, 1934______________ $140, 453. 60
Amount covered by uncompleted contracts ------- 799, 014. 27
                                                                                                                        939, 467. 87

     Balance available June 30, 1934_____     __.___________--                                                          697, 500. 00
Accounts receivable June 30, 1934__________________ -          ___                                                       19, 660. 79

           Unobligated balance avilable June 30, 1934 ______--...                                                       717, 160. 79

Amount (estimated) required to be appropriated for completion
    of existing project 1---------------                                                                             4, 902, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1936:
       For new work 1-                           -----------                                                         2, 402, 000. 00
       For maintenance 1 -1-----------1,                                                                                859, 598. 06
                    -    - - - - - - - - - - - - - - - - - - - - - - - - --- - - - - - - - - - - - - - - - - - - -
           Total 1                                                                                                   4, 261, 598. 00
                                                         PUBLIC WORKS FUNDS

Cost of new work to June 30, 1934 ____________-_--  ___ ___ -_    3, 294, 831. 17
Cost of maintenance to June 30, 1934----------------           ___-------------

      Total cost of permanent work to June 30, 1934--.                                                .--.           3, 294, 831. 17
Value of plant, materials, etc., on hand June 30, 1934                                                                 -24, 912. 50

      Net total cost to June 30, 1934_-----------------------                                                        3, 269, 918. 67
Plus accounts receivable June 30, 1934 -------__   --------                                                           ----    44. 70

     Gross total costs to June 30, 1934 _______ ___ ----__----- 3, 269, 963. 37
Minus accounts payable June 30, 1934-------------------------      361, 818. 05

     Net total expenditures__-----__--__
                                      _--_ --------                                                                  2, 908, 145. 32
Unexpended balance June 30, 1934___________________________                                                          2, 051, 854. 68

           Total amount appropriated to June 30, 1934 ...------                                                      4, 960, 000. 00


    Fiscal year ending June 30                           1930           1931             1932                1933              1934


Cost of new work ..                                            ---   -------   --------.--.-         ------------ .      $3, 294, 831. 17
Cost of maintenance -            -----        ----------------------------           ----------------------------------------
Total expended ------------------------                                                                   -----------       2, 908, 145. 32

Allotted .-......    -                   .................                                                                  4, 960, 000. 00

    1Exclusive of available funds.
                    RIVERS AND HARBORS-MISSOURI RIVER DIVISION                                                       831
Amount allotted from National Industrial Recovery Act ap-
  proved June 16, 1933------------------------------------       $4, 960, 000. 00
Gross amount expended-_                         $2, 910, 320. 96
Less reimbursements collected------------------       2, 175. 64
                                                                  2, 908, 145. 32

      Balance unexpended June 30, 1934----------------------2, 051, 854. 68
Outstanding liabilities June 30, 1934------------ $87, 920. 70
Amount covered by uncompleted contracts------ 1, 744, 235. 27
                                                               1, 832, 155. 97

      Balance available June 30, 1934----------------                                                       219, 698. 71
Accounts receivable June 30, 1934---                                                                              44. 70

     Unobligated balance available June 30, 1934                                                            219, 743. 41
Amount allotted by Public Works Administration, Emergency
Appropriation Act, fiscal year 1935-------------------------                                             1, 736, 000. 00

         Balance available for fiscal year 1935,__                                                        1, 955, 743. 41
                       ,
    CONSOLIDATED           COST AND      FINANCIAL         SUMMARY       FOR MISSOURI           RIVER,      KANSAS
                                                CITY     TO MOUTH


Cost of new work to June 30, 1934_-                         $70, 429, 152. 13
Cost of maintenance to June 30, 1934------------------------ 9, 673, 463. 32

      Total cost of permanent work to June 30, 1934- -------                                         80, 102, 615. 45
Value of plant, materials, etc., on hand June 30, 1934                                ---------       2, 876, 232. 79
      Net total cost to June 30, 1934__                                                              82, 978, 848. 24
Plus accounts receivable June 30, 1934_                                                                   19, 705. 49
      Gross total costs to June 30, 1934--------------------                                         82, 998, 553. 73
Minus accounts payable June 30, 1934------------------------                                             628, 333. 72
     Net total expenditures                                                                           2, 370, 220. 01
                                                                                                     8-------------------------------
Unexpended balance June 30, 1934__--------------------------_                                         3, 688, 822. 55
         Total amount appropriated to June 30, 1934------------                                      86, 059, 042. 56

  Fiscal year ending              1930              1931                1932               1933                 1934
        June 30

Cost of new work------      $13, 819, 854. 64   $9, 694, 631. 02   $6, 769, 662. 95    $8, 350, 995. 71      $5, 472, 110. 12
Cost of maintenance:          1, 785, 691. 68    1, 331, 820. 97    2, 090, 293. 21        811, 188. 38          668, 093. 26
      Total cost_......      15, 605, 546. 32   11, 026, 451. 99    8, 859, 956. 16     9, 162,184. 09        6, 140, 203. 38
Total expended....           14, 041, 498. 84   10, 916, 775. 76    9, 499, 153. 29     9, 208, 311. 07       6, 778, 263. 50
Allotted_   -   _            14, 390, 000. 00   14, 614, 245. 70    2, 668, 600. 00     7, 874, 672. 44       8, 302, 973. 24



Balance unexpended July 1, 1933----------------------------     $2, 164, 112. 81
Amount allotted from War Department Appropria-
tion Act approved Apr. 26, 1934---------------- $697, 500. 00
Amount allotted from War Department Appropria-
tion Act approved Feb. 23, 1931---------------    883, 822. 67
Amount allotted from War Department Appropria-
  tion Act approved July 14, 1932----------------  656, 000. 00
Amount allotted from War Department Appropria-
  tion Act approved Mar. 4, 1933--------------- 1, 217, 975. 76
Amount allotted from National Industrial Re-
covery Act approved June 16, 1933------------4, 960, 000. 00
                                                                 8, 415, 298. 43

        Amount to be accounted for--_____________________                                            10,579,411.24
        91536-ENG 1934-  53
832         REPORT OF CHIEF OF ENGINEERS,                            U. S.     ARMY,         1934

Deductions on account of revocation of--
   Allotment-------------------------------                                $15, 298. 97
   Impounded funds-------------------------                                 97, 026. 22
                                                                                              $112, 325. 19

      Net amount to be accounted for--------------------               10, 467, 086. 05
Gross amount expended --------------------            $7, 496, 242. 16
Less-
    Reimbursements collected ----       - $705,380.92
    Receipts from sales------------12, 597. 74
                                                          717, 978.66
                                                                        6, 778, 263. 50
      Balance unexpended June 30, 1934-------------------                                    3, 688, 822.55
Outstanding liabilities June 30, 1934------------ $228, 374. 30
Amount covered by uncompleted contracts ----- 2, 543, 249. 54
                                                                                             2, 771, 623. 84
      Balance available June 30, 1934 -----------------------                                  917, 198. 71
Accounts receivable June 30, 1934---------------------------                                    19, 705. 49
     Unobligated balance available June 30, 1934-------------    936, 904. 20
Amount allotted by Public Works Administration Emergency
Appropriation Act fiscal year 1935                              736, 000.00
                                                              1-----------------------,
        Balance available for fiscal year 1935----------------2,                               672, 904. 20

Amount (estimated) required to be appropriated for comple-
tion of existing project 1---4----------------------------                                   , 902, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1936:
   For new work 1     -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
                                                                                             2, 402, 000. 00
   For maintenance 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -      , 859, 598. 00
         Total        -----------------------------------------                              4, 261, 598. 00

    2. MISSOURI RIVER, KANSAS CITY, MO., TO SIOUX CITY, IOWA

   Location.-See page 823. The river is the boundary between the
States of Missouri, Kansas, Nebraska, and Iowa.
   Previous projects.-Under the River and Harbor Act of August
14, 1876, the first regulation works were constructed at St. Joseph
and Nebraska City; but a project for systematic river improvement
was not adopted until August 2, 1882, modified by the River and
Harbor Acts of July 5, 1884, September 19, 1890, and June 13, 1902.
The costs and expenditures up to, but not including, the allotment
from the War Department Appropriation Act of March 23, 1928,
were $2,586,616.56 for new work, and $570,203.93 for maintenance;
a total of $3,156,820.49.
  Existing project.-This provides for securing a permanent navi-
gable channel 6 feet in depth and to conform to the character and
methods of improvement of the section of river between the upper
end of Quindaro Bend and the mouth, namely, by means of bank
revetment, permeable dikes to contract and stabilize the waterway,
removal of snags, and occasional dredging. The ordinary fluctuation
is about 14 feet and the extreme fluctuation about 38 feet.
   The estimated cost of new work, revised in 1932, exclusive of
amounts expended on previous projects, is $77,000,000. Appropri-
ations are limited by law to an amount of $27,000,000.
  SExclusive of available funds.
          RIVERS AND HARBORS-MISSOURI         RIVER DIVISION        833
   The existing project was adopted by the River and Harbor Act of
January 21, 1927 (H. Doc. No. 1120, 60th Cong., 2d sess.), which
authorized the appropriation of $12,000,000 for the prosecution of
this project and the River and Harbor Act approved July 3, 1930,
authorized the additional appropriation of $15,000,000, or a total of
$27,000,000. Additional allotments totaling $29,153,108, were made
by the Public Works Administration under the provisions of the
National Industrial Recovery Act of June 16, 1933.
   Local cooperation.-No conditions have been imposed by law for
the initiation of cooperative works on the Missouri River between
Kansas City and Sioux City. No cooperative funds were received
or expended during the fiscal year 1934.
   Works for the benefit of the public constructed by private interests
at their own expense were as follows:
   Gibson bend, right bank, mile 654.5: 2,970 tons of rock and miscel-
laneous material were used to repair retards nos. 1 and 3, and to
repair the revetment. Work was completed May 25, 1934, at a total
cost of $6,275.65 to the Chicago, Burlington & Quincy Railroad Co.
   Sioux City Bend, mile 807.3, left bank: The city of Sioux City,
Iowa, during fiscal year 1934, made a fill of approximately 16,000
cubic yards of miscellaneous material along the left highbank in the
vicinity of the combination bridge. All costs charged against other
local projects for removal of material.
   Terminal facilities.-The facilities are considered adequate for
existing commerce.
   Operations and results during fiscal year.-New work completed
during the year, with Government funds, consisted of 138 dikes total-
ing 133,495 linear feet, 4 abatis totaling 3,337 linear feet, 1 revetment
drain totaling 130 linear feet, and 20 pieces of revetment totaling
57,200 linear feet. In addition to completed work there are in proc-
ess of construction, under contract and by hired labor, 74 dikes to
total about 157,467 linear feet and 19 pieces of revetment to total
about 91,435 linear feet. Maintenance consisted of repairs to 8,359
linear feet of dikes, 3,400 linear feet of revetment, and 2,660 linear
feet of retards. Snagging operations, Kansas City to Sioux City,
resulted in the removal of 407 snags and 1 wreck from the channel,
and 5,366 trees and 116 cords of underbrush cut from along the bank.
Dredging operations during the year, by the U. S. dredge Robert
McGregor resulted in the removal of 3,673,386 cubic yards from 4
localities at a total cost of $94,795.54, charged to new work, and
42,940 cubic yards from 2 localities at a total cost of $7,313.09,
charged to maintenance. Unallocated surveys amounting to $24,-
235.41 were made during the fiscal year, charged to new work. The
cost of the stream gaging was $853.08, charged to maintenance. The
total cost of channel marking during the year amounted to $263.93.
Construction of two land pile drivers by hired labor was completed
during the fiscal year.
   The cost of new work was $10,326,287.16 ($2,533,689.94 regular
funds and $7,792,597.22 Public Works funds) and the cost of mainte-
nance $94,642.49, a total of $10,420,929.65. The expenditures during
the fiscal year amounted to $9,657,974.14, including $6,929,385.88
Public Works funds.
 834               REPORT             OF CHIEF OF ENGINEERS,                                       U.     S.     ARMY,           19:34

    Condition at end of fiscal year.-Considerable work has been done
between Kansas City and Nodaway River, a distance of 102 miles,
resulting in a marked improvement of the channel and stabilization
of the banks. The entire channel in this section is becoming fixed,
and at ordinary stages a 5-foot depth is available. Dredging is
required at low stages to remove temporary shoals and maintain the
required channel depth for navigation. Between Nodaway River
and Sioux City the work has not progressed sufficiently for a com-
parison between minimum channel dimensions and project dimen
;sions.
   Under the existing project, beginning with the allotment from
War Department Appropriation Act of March 23, 1928, for sys-
tematic work on the 6-foot channel, the work accomplished includes
168,366 linear feet of revetment for permanently fixing the banks;
396,597 linear feet of pile dikes, 7,155 linear feet of abatis, 2,287
linear feet of jetties, recrowning 700 linear feet of an existing levee,
19,218 linear feet of retards for stabilization of channel widths and
,closing of auxiliary chutes; 130 linear feet of revetment drains; and
the removal of 5,007,519 cubic yards of material dredged from the
channel to obtain channel depths.
   The total cost of work under the existing project is $21,473,436.21,
of which $20,969,116.24 ($13,176,519.02 regular funds and $7,792,-
597.22 Public Works funds) was for new work and $504,319.97 for
maintenance.      The expenditures were $20,423,459.73, including
$6,929,385.88 from Public Works funds. (For expenditures by local
interests see paragraph Local cooperation.)
   Proposed operations.-The balance unexpended ($859,803.68), and
accounts receivable ($1,104.11) at the end of the year will be applied
as follows:

                                                                                                         Kansas           Rulo,
                                                                                                         City to         Nebr. to
                                                                                                           itulo,          Sioux             Total
                                                                                                          Nebr.            City,
                                                                                                                           Iowa

Accounts payable June 30, 1934_-----                            ------------------- --               $247, 872. 45       $29, 721. 02      $277, 593. 47

New work (channel-contraction and bank-protection work by dike
  and revetment construction), by contract (June 30 to Dec. 30, 1934):
     Existing contracts:
         Weavers and Pomeroy Bends, dikes and revetment                                                 94, 672. 56                          94, 672. 56
            Oak Mills and Iatan Bends, dikes and revetment     ------- _ 197, 575. 85                                                       197, 575. 85
            Pomeroy Bend, dikes_ _.------------  ------------------       68, 588. 98                                                        68, 588. 98
            Floyd and Dakota Bends, dikes and revetment                                                                  69, 571. 56         69, 571. 56
           Total -           -     -- ____       ---       ----        -----------------             360, 837. 39        69. 571.56         430, 408.95
Maintenance (July 1, 1934, to June 30, 1935), by hired labor: Main-
t ena nc e a n d r e p ai r o f e x i st i ng w o r ks _ _ . . . . . . . . . . . .- . . ..- . . . .. 9 2 , 8 0 3 . 13   60 , 10 2 . 2 4    15 2 , 9 05. 37

        Total for all work ------------------------------------------- 701, 512. 97                                      159, 394. 82       860, 907. 79



  The balance unexpended ($7,223,722.12) from funds provided un-
der the provisions of the National Industrial Recovery Act, and
accounts receivable ($28,890.99), together with an allotment of
$15,000,000 made during July 1934, will be applied as follows:
                RIVERS AND HARBORS-MISSOURI                                                       RIVER                      DIVISION                        835
                                                      I                      I                                           I                        I
                                                             Estimated            Kansas City                                Rulo, Nebr.,
                                                               date of             to Rulo,                                    to Sioux                  Total
                                                             completion              Nebr.                                    City, Iowa


Accounts payable_------------                                                        $281,049.14 $632, 610.49                                          $913, 659. 63
New work:
   Completion of existing contracts:
      Bon Ton-St. Joseph Bends, dikes, and
        revetment ..... . .             .           Nov. 30, 1934      194, 946.82
      Burr Oak and Amazonia bends, dikes,
        and revetment_ ._                          ----.do __--        532, 251. 47
      Dallas and Burr Oak Bends, dikes, and
        revetment_ .......                           Sept. 1, 1934     225, 414. 22
      Floyd and Dakota Bends, dikes and
        revetment _......       ....        . -     Dec. 31,1934                 -------------                                 624, 125. 92
      Florence Bend and The Narrows,
        dikes and revetment---------                Apr. 30,1935                   - --       - - -       --     - - -         378, 256. 60
      The Narrows and Council Bend,
        dikes and revetment_                 _      July 31,1934                    .- -      -     - -        - -   -           38, 255. 73
      Omaha and Gibson Bends, dikes and
        revetment________                  ___    _ June 30,1935                 - - -    -       - - - -        - - -         359, 364. 61
      Tobacco and Rock Bluff Bends, dikes
        and revetment ___._.                  __    ....do ....... . . .-- -- -                                                929, 434. 56
      Nebraska, Frazers, and Otoe Bends,
        dikes and revetment ______                  --
                                                     ___do........ .      -- -- -                                              971, 856. 37
      Peru and Sonora Bends, dikes and re-
        vetment- .         -...
                          ......     ...........- Dec. 31,1934 . . . .. . - ---                                                  94, 650. 61
      Sonora and Brownville Bends, dikes
        and revetment__.....___....              _    ..do----      -------------                                              215, 095. 58
      Brownville and Langdon Bends, dikes
        and revetment._______________               ... do.....                                                                444, 726. 99
                                                                      183, 000...00
      Rulo Bend, dikes and revetment .---.         ----.. do----- .                                                             85, 585. 83
      White Cloud, Tarkio, and Wolf Creek
        Bends, dikes and revetment_ __               Oct. 30,1934                                                              244, 533. 16
      Mount Vernon and Charleston Bends,
        dikes___- - - - - - - - - - - - - - July 31, 1934                                                                        55, 084.86
      Charleston and Dallas Bends, dikes
        and revetment_________________              Dec. 31,1934                                                               945, 370. 15
             Total existing contracts------                                              952, 612. 51                                  97
                                                                                                                             5, 386,340.              6, 338,953.48
    Extensions to existing contracts:
        White Cloud, Tarkio, and Wolf Creek
          Bends, dikes and revetment--- ---- June 30,1935   184, 000. 00                                                     ------------
        Burr Oak and Amazonia Bends, dikes
          and revetment ------------
                                   __     - ---- do ..... 128, 000. 00
        Brownville and Langdon Bends, dikes_ -- --do ......                                                                    224, 000. 00
        Nebraska-Frazer-Otoe Bend, dikes --     -- do .- -                                                                     561, 000. 00
        Tobacco-Rock Bluff Bend, dikes -_-      -- do ...                                                                      157, 000. 00
        Floyd and Dakota Bends, dikes ..---               ----   do-------                                                     192, 000. 00
          Total extensions to existing contracts_                                        312, 000. 00                        1, 134, 000. 00          1, 446, 000. 00
    Proposed contracts:
        Delaware Bend, dikes'_-                   June 30,1935          75, 000. 00
        Kickapoo and Weston Bends, dikes
         and revetment ..__                      -- - do .......      183, 000.00
       McQueens Bend, dikes-----------_                do ....... 75, 000.00
                                                   ....-
        Rulo to Nemaha Bends, dikes --_-_--       ---- do-- -----                                                                   00
                                                                                                                             1,013,000.
        Squaw and White Cloud Bends, dikes_ -----      do .......                                                               894, 000. 00
       White Cloud and Tarkio Bends, dikes_ - d o .- -----                                                                   1, 028, 000. 00
       Indian Cave-Hemmies Bend, dikes
         and revetm ent _.......... .........      -- do - - -                                                               1, 740, 000. 00
       Nishnabotna-Peru Bend, dikes and
         revetment__- -- -- - - --                - __-do .......                                                              477, 000. 00
       Kansas-Nishnabotna Bend, dikes, re-
         vetment, and abatis-...............    ---- do .......                                                                772, 000. 00
       Hamburg Bend, dikes and revetment_              do ------.                                                             -----
                                                                                                                              372, 000. 00
       Copeland-Nebraska Bend, dikes and
         revetment...................________ .....    do .......                                                              747, 000. 00
       Copeland Bend, dikes and revetment_ ..- do ......                                                                       240, 000. 00
       Civil-Copeland Bends, dikes and
         revetment--____.. ---- ..--      ..--- ---- do----- --                                                                513, 000. 00
       Civil Bend, dikes and revetment______ ---- do -------                                                                   661,000.00
       St. Marys-Papillon-Plattsmouth Bend,                       ... ......   .. .
         dikes, revetment, and Abatis ....... --- do -                                                                       1, 325, 000. 00
       Bellevue-St. Marys Bends, dikes...... ----do                                                                             354, 000. 00
       Bellevue Reach, dikes and revetment_ ----do-                                                                             698, 000. 00
       Gibson-Manawa Bend, dikes and re-
          vetment               -     -       -               d o .......
                                                          .....                                                                651,   000.   00
        Blair Bend, dikes and revetment ...  -----
                                                 do .. ----                                                                    330,   000.   00
        Decatur Bend, revetment_____________ -----
                                                 do                 ------                                                     200,   000.   00
        Langdon Bend, dikes_________________ --- do -------                                                                    186,   000.   00
          Total proposed contracts- ....-         -       ---------------                      00 12,201,000.00
                                                                                            000.
                                                                                         333,                                                               000.00
                                                                                                                                                      12,534,
836         REPORT         OF CHIEF          OF ENGINEERS,                   U.      S. ARMY,             1934


                                                          Estimated        Kansas City Rule, Nebr.,
                                                            date of         to Rule,    to Sioux                    Total
                                                          completion          Nebr.    City, Iowa

New work-Continued.
   Proposed work by hired labor:
       Wolf Creek-Forbes Bend, dikes-----           .....------------------------......$739, 000. 00
       Elwood-St. Joseph Bend, revetment----------------            $12, 000. 00
       Parkville Bend, dikes--------- --------------           I 192, 000. 00 -                   -
   Dredging for shaping river to desired
     alinement:
       Parkville Bend ------------------ ---------------             50, 000. 00             -
       Pomeroy Bend------------------ --------------                 27, 000. 00 __
           Total proposed works (hired labor,
            National Industrial Recovery                               I
            Administration funds) ..-------------..-----...--.               281, 000. 00         739, 000. 00    1, 020, 000. 00
           Total for all work.._..........           .........-..          2, 159, 661. 65 20, 092, 951.46       22, 252, 613. 11


  The additional sum of $16,540,000 can be profitably expended
during the fiscal year ending June 30, 1936, as follows:

                                                                           Kansas City Rulo, Nebr.,
                                                                            to Rule,     to Sioux                    Total
                                                                              Nebr.     City, Iowa

New work (July 1, 1935, to June 30, 1936), channel-contraction
and bank-protection work by dike and revetment construc-
tion:
                    ---
    By contract_- ____________             -----------
                                            ___-                           - $1, 324, 610        $14, 500, 000     $15, 824, 610
    Project dimensions of channel by dredging (2 dredges, 3
      months each)_____---.._...--__----   _....----   ..-------            .........--------------. 150, 000           150, 000
                                                                              1, 324, 610         14; 650, 000      15, 974, 610
Maintenance (July 1 ,1935, to June 30, 1936), by hired labor:
   Maintenance and repair of existing works-----------------                      170, 000        300, 000              470, 000
   Snagging operations_____---_-----___-_-____         _-_-__                      15, 390         50, 000               65, 390
   Surveys, gages, and studies__-----------------------------                      30, 000 --------------                30, 000
                                                                                  215, 390           350, 000           565, 390
      Total for all work--- -- ._         ...-.-----------.........           1, 540, 000         15, 000, 000      16, 540, 000


                                      Cost and financial summary

                              MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934-------------------                                                     $15, 763, 135. 58
Cost of maintenance to June 30, 1934___ ---          ___----------                                         1, 074, 523. 90

      Total cost of permanent work to June 30, 1934--______                                               16, 837, 659. 48
Value of plant, materials, etc., on hand June 30, 1984-- __-__ _                                              153, 746. 11

      Net total cost to June 30, 1934_--__ -____-___-                                             ___     16, 991, 405. 59
Plus accounts receivable June 30, 1934--__---__ _____                                              -1,             104. 11

     Gross total costs to June 30, 1934-------___________                                                 16, 992, 509. 70
Minus accounts payable June 30, 1934---_-- ______________-                                                    277, 593. 47

     Net total expenditures--- ___
                                --                              ------     ____    __---  16, 714, 916. 23
Unexpended balance June 30, 1934                                    -________________________ 8599, 803. 68

         Total amount appropriated to June 30, 1934                                                       17, 574, 719. 911
                 RIVERS AND HARBORS-MISSOURI                                           RIVER DIVISION                         837

    Fiscal year ending June 30                1930              1931                   1932              1933             1934


Cost of new work--...       ..........    $2, 734, 550. 24 $2, 316, 465. 56 $1, 001, 638. 96 $4, 161, 251. 93         $2, 533, 689. 94
Cost of maintenance-----__-------__......      82, 405. 64      22, 292. 94     193, 155. 39      96, 159. 60              94, 642. 49
       Total cost--------------          2, 816, 955. 88   2, 338, 758. 50      1, 194, 794. 35     4, 257, 411. 53    2, 628, 332. 43

Total expended_--------------            2, 440, 322. 95   2, 565, 619. 44      1, 180, 384. 90     4, 110, 050. 44    2, 728, 588. 26

Allotted ---.      ---------------- 2, 875, 000. 00        1, 925,000. 00            271, 400. 00   6, 109, 296. 51    1, 073, 181. 02



Balance unexpended July 1, 1933                                          515, 210. 92
                                                                     $------------------------2,
Amount allotted from War Department Appropria-
  tion Act approved July 14, 1932_--- -         ___-_-$882, 500. 00
Amount allotted from War Department Appropria-
  tion Act approved Mar. 4, 1933---------------___      220, 000. 00
                                                                      1, 102, 500. 00

     Amount to be accounted for__      ___---__-------      -                                                      3,617, 710. 92
Deductions on account of revocation of--
   Allotment--------------------------------$3, 000. 00
   Impounded funds-------------------                  26, 318.98
                                                                                                                       29, 318. 98

       Net amount to be accounted for-- -----------                                                                3, 588, 391. 94
Gross amount expended --------                  -
                                               __-  $3, 021, 069.99
Less--
    Reimbursements collected------ $213, 066. 52
    Receipts from sales-- _______---     79, 406. 21
                                                        292, 472. 73
                                                                                                                   2, 728, 588. 26

      Balance unexpended June 30, 1934- -----.-                                              ---------                859, 803.68
Outstanding liabilities June 30, 1934------------                                         $253, 856. 63
Amount covered by uncompleted contracts --------                                           546, 192. 35
                                                                                                                      800, 048.98

      Balance available June 30, 1934----------------                                                                  59, 754. 70
Accounts receivable June 30, 1934   ---------------------                                                               1,104. 11

          Unobligated balance available June 30, 1934_-----------                                                      60, 858. 81
Amount that can be profitably expended in fiscal year ending
June 30, 1936 for maintenance 1_                                                                                     565, 390. 00

                                               PUBLIC WORKS FUNDS

Cost of new work to June 30, 1934 ---__.....---           - $7, 792, 597. 22
                                                .----------
Cost of maintenance to June 30, 1934__________                                                                     -------------
      Total cost of permanent work to June 30, 1934___ ___ _ 7, 792, 597. 22
Value of plant, materials, etc., on hand June 30, 1934_--------- 21, 557. 30

      Net total cost to June 30, 1934__ ---------           ____                                         --        7, 814, 154. 52
Plus accounts receivable June 30, 1934_--------------------                                                            28, 890. 99

      Gross total costs to June 30, 1934                                   ____---        -----                    7, 843, 045. 51
Minus accounts payable June 30, 1934___                                _             - -- _____               _-      913, 659. 63

     Net total expenditures__---                     _-------
                                                         6, 929, 385. 88
Unexpended balance June 30, 1934_________---_----___     7, 223, 722. 12

          Total amount appropriated to June 30, 1934____________ 14, 153, 108.00

   1 Exclusive of available funds.
838           REPORT       OF CHIEF OF ENGINEERS, U.                                            S. ARMY,           1934


    Fiscal year ending June 30                1930                    1931              1932              1933                1934


Cost of new work-    -      -    -     -      -   _-_ -          --                                           --        $7, 792, 597. 22
Cost of maintenance-
Total expended                                                                                                            6, 929, 385. 88
Allotted_-                                                                                                              14, 153, 108. 00


Amount allotted from National Industrial Recovery Act ap-
  proved June 16, 1933-----------------------------------         $14, 153, 108. 00
Gross amount expended                            $7, 177, 030. 58
Less-
    Reimbursements collected ..... $246, 654.23
    Receipts from sales     _            990. 47
                                                     247, 644. 70
                                                                    6, 929, 385. 88
      Balance unexpended June 30, 1934 ---------------------                                                         7, 223, 722. 12
Outstanding liabilities June 30, 1941111111_     $352, 574. 08
Amount covered by uncompleted contracts------ 6, 871, 148. 04
                                                                                                                     7, 223, 722. 12
Accounts receivable June 30, 1934 ________ -  -______   - -__    28, 890. 99
Amount allotted by Public Works Emergency Appropriation
Act fiscal year 1935_____------ ______________________     15, 000, 000. 00

          Balance available for fiscal year 1935------------------15,                                                  028, 890. 99
Amount (estimated) required to be appropriated for completion
of existing project 1-_- -- -     _____________                                                                   34, 000, 000. 00

Amount that can be profitably expended in fiscal year ending
   June 30, 1936, for new work 1____-___-_                                                                         15, 974, 610. 00
CONSOLIDATED           COST AND FINANCIAL                  SUMMARY             FOR      MISSOURI       RIVER,        KANSAS        CITY
                                                     TO    SIOUX         CITY

Cost of new work to June 30, 1934___________________________ $23, 555, 732. 80
Cost of maintenance to June 30, 1934__-                        1, 074, 523. 90

      Total cost of permanent work to June 30, 1934                                        ----------              24, 630, 256. 70
Value of plant, materials, etc., on hand June 30, 1934                                          --------               175, 303. 41

      Net total cost to June 30, 1934-------------------                                                           24, 805, 560. 11
Plus accounts receivable June 30, 1934_                                                                                 29, 995. 10

      Gross total costs to June 30, 1934----------------------                                                     24, 835, 555. 21
Minus accounts payable June 30, 1934__________ _________                                                            1, 191, 253. 10
     Net total expenditures___________________________                                                             23, 644, 302. 11
Unexpended balance June 30, 1934__-__________-__________                                                            8, 083, 525. 80
          Total amount appropriated to June 30, 1934------------                                                   31, 727, 827. 91

  Fiscal year ending            1930                      1931                   1932
        June 30                                                                                       1933                  1934


Cost of new work           $2, 734, 550. 24       $2, 316, 465. 56           $1, 001, 638, 96     $4, 161, 251. 93     $10, 326, 287. 16
Cost of maintenance___          82, 405. 64            22, 292. 94               193, 155. 39          96, 159. 60           94, 642. 49
       Total cost-......    2, 816, 955. 88          2, 338, 758. 50          1, 194, 794. 35      4, 257, 411. 53      10, 420, 929. 65
Total expended--------     2, 440, 322. 95           2, 565, 619. 44          1, 180, 384. 90      4, 110, 050. 44        9, 657, 974. 14
Allotted- _---------       2, 875, 000. 00           1, 925, 000. 00            271, 400. 00       6,109, 296. 51       15, 226, 289. 02

   1Exclusive of available furnds.
              RIVERS     AND HARBORS-MISSOURI         RIVER DIVISION                     839
Balance unexpended July 1, 1933_____________ ___________                 $2, 515, 210. 92
Amount allotted from War Department Appro-
  priation Act approved July 14, 1932_-_______  $882, 500. 00
Amount allotted from War Department Appro-
  priation Act approved Mar. 4, 1933_--   __---  220, 00. 00
Amount allotted from National Industrial Recov-
  ery Act approved June 16, 1933 __.____ __ 14,153, 108. 00
                                                                         15, 255, 608. 00

     Amount to be accounted for _____     _________-____-                17, 770, 818. 92
Deductions on account of-
   Revocation of allotment ______________          $3, 000. 00
   Revocation of impounded funds____-__
                                    -        _     26, 318. 98
                                                                                29, 318. 98

       Net amount to be accounted for _________------------17, 741, 499. 94
Gross amount expendedd___________________ $10, 198,091. 57
Less--
    Reimbursements collected        $459, 720. 75
    Receipts from sales ________      80, 396. 68
                                                  540, 117. 43
                                                               9, 657, 974. 14

          Balance unexpended June 30, 1934________________-____           8, 083, 525. 80
Outstanding liabilities June 30, 1934___________       $606, 430. 71
Amount covered by uncompleted contracts                7, 417, 340. 39
                                                                          8, 023, 771. 10
      Balance available June 30, 1934___ ___________________-59, 754. 70
Accounts receivable June 30, 1934- --- ___---__- -----------  29, 995. 10

     Unobligated balance available June 30, 1934 _._____-                       89, 749. 80
Amount allotted by Public Works Administration Emergency
Appropriation Act fiscal year 1935-------------------------             15, 000, 000. 00

          Balance available for fiscal year 1935------------------       15, 089, 749. 80

Amount (estimated) required to be appropriated for completion
  of existing project 1 ___---        --------                           34, 000, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1936:               - -                                        15 , 9 7 4 , 6 1 0 . 0 0
   For new work 1                        -
   For maintenance 1--------------------                                      565, 390. 00

          Total 1--___________         __.                               16. 5401, 000. 00

3. MISSOURI RIVER, SIOUX CITY, IOWA, TO FORT BENTON, MONT.

   Location.-See page 823. Through this section the river flows
across the States of Montana and North Dakota and South Dakota,
forming the northeastern boundary of Nebraska.
   Previous projects.-Projects were adopted and modified by river
and harbor acts as follows: August 14, 1876, above the mouth of
the Yellowstone; June 18, 1878, Sioux City; March 3, 1879, Ver-
milion; and August 2, 1882, Sioux City to Fort Benton. Modifica-
tions of September 19, 1890, and August 18, 1894, extended the im-
provement to Great Falls, then to Stubbs Ferry, Mont.
   The total costs and expenditures up to June 30, 1912, were $2,823,-
061.61, of which $2,606,655.87 was for new work, $216,405.74 for
  1   Exclusive of available funds.
840     REPORT    OF CHIEF OF ENGINEERS, U.           S. ARMIY,   1934


maintenance. (For further details see p. 1108 of Annual Report for
1927, and p. 1894 of Annual Report for 1915.)
   Existing project.-This provides for the expenditure of from
$75,000 to $150,000 yearly for 5 years from date of the project in
the removal of snags and rocks from the channel and in bank protec-
tion within easy boat reach of landings, towns, and railroad cross-
ings between Sioux City, 769 miles above the mouth, and Fort Ben-
ton. Since the expiration of the 5-year limit funds have been ex-
pended in the maintenance of existing landings. At Sioux City the
ordinary fluctuation is about 10.4 feet, and the extreme fluctuation
 (freshet of 1892 from Floyd River) is about 25 feet. At Fort Ben-
ton the ordinary fluctuation is about 7.3 feet, and the extreme fluctua-
tion about 17 feet.
   The project was adopted by the River and Harbor Act of July 25,
1912 (H. Doc. No. 91, 62d Cong., 1st sess.). The latest published
map is in the project document.
    Terminal facilities.-The facilities are considered adequate for
existing commerce.
    Operations and results during fiscal year.-Unallocated surveys
during the year, charged to new work, amounted to $439. Snagging
by contract resulted in the removal of three snags from the channel
and the cutting of 4,340 overhanging trees from along the banks of
the 91 miles of river operated upon at a total cost of $1,330.33.
Additional maintenance consisted of the upkeep of the harbor and
yard at Rockhaven. The total cost was $8,157.09, of which the cost
of new work was $439 and maintenance $7,718.09. The expenditures
were $2,021.57.
    Condition at end of fiscal year.-As cutting of the banks is less
marked above Sioux City and is of little moment above the mouth
of the Yellowstone River, demand for bank-protection work is not
so urgent as on the lower Missouri River. In 1878 rock dams and
dikes were built between Fort Benton and Carroll, Mont., to con-
centrate the meager low-water flow, and the rapids were cleared of
rocks and boulders; but, lacking maintenance, the river has reverted
for the most part to the previous state. Limited appropriations
hold Government expenditures to meritorious cooperative projects
and a small amount of repairs to existing works.
   From April to October, inclusive, drafts of 30 inches are practica-
ble to Pierre, 26 inches to the Montana State line, and 22 inches to
Fort Benton.
    The cost of new work under the existing project up to June 30,
1934, was $513,404.22 and the cost of maintenance was $409,199.83, a
total of $922,604.05. Expenditures were $920,560.04.
   Proposed opterations.-The balance unexpended, $7,976.35, at the
end of the year, together with an allotment of $2,500 made during
July 1934, will be applied as follows:
Maintenance (July 1, 1934, to, June 30, 1935):
    Maintenance and repair of existing works (by hired labor) ..--- $8, 476. 35
    Snagging operations (by contract) ------------------------- 2, 000. 00

      Total_----------------------
                              ---------------------                  10, 476. 35
  The additional sum of $10,000 can be profitably expended during
the fiscal year 1936 for maintenance and repair of existing works by
contract.
                RIVERS AND HARBORS--MISSOURI                                RIVER DIVISION                        841
                                   Cost and financial summary

Cost of new work to June 30, 1934  .-------------
Cost of maintenance to June 30, 1934__
                                                  _---_---_---                                   $3, 120, 060. 09
                                                                                                     6----__-___
                                                                                            -______ 625,   605. 57
      Total cost of permanent work to June 30, 1934__ .__._ 3, 745, 665. 66
Value of plant, materials, etc., on hand June 30, 1934----------- 2, 162. 44
       Net total cost to June 30, 1934_111111111111111 3,747, 828. 10

Net total expenditures--------------------                                                          3,747, 828. 10
Unexpended balance June 30, 1934 -----------                                  -----....                 7, 976..35

       Total amount appropriated to June 30, 1934- .-.-----                                      - 3, 755, 804. 45

       Fiscal year ending June 30                 1930          1931             1932           1933            1934

Cost of new work...--------------------        $36, 094. 34   $8, 477. 12    $42, 332. 32 --                     $439. 00
Cost of maintenance_ __---.-------               8,165. 27    10, 277. 47     12, 742. 45    $4, 285. 43        7, 718. 09

     Total cost ......----------------------    44, 259. 61   18, 754. 59     55, 074. 77      4, 285. 43       8, 157. 09

Total expended_----------__-__---_              43, 951. 18   18, 159. 89     59, 025. 14      3, 814. 31       2, 021. 57

Allotted___-.    .-..-----------      _- --     10, 000. 00    5, 000. 00     59, 000. 00      -198. 98         5, 735. 37


Balance unexpended July 1, 1933 ___-__- _____--------___                                                    $4, 262. 55
Amount allotted from War Department Appropriation Act ap-
  proved March 4,1933_                                                                                      10, 000. 00
      Amount to be accounted for            - ---------                                                     14, 262. 55
Deductions on account of, revocation of-
   Allotment--------------------------------$4, 262. 55
   Impounded funds-.-----------------------             2. 08
                                                                                                             4, 264. 63

      Net amount to be accounted for__--------                                                               9,997. 92
Gross amount expended_                __--------
                                   ----
Less reimbursements collected---------------------
                                                  $2,333.83
                                                     312. 26
                                                                                                             2, 021. 57

      Balance unexpended June 30, 1934 _____                                ___------------                  7, 976.35
Outstanding liabilities June 30, 1934________                                              -                    1___----------
                                                                                                            -100.00

        Balance available June 30, 1934__--                        -----------                               7,876. 35

Amount that can be profitably expended in fiscal year ending
                                 -- ----- -       -                                                    -
June 30, 1936 for maintenance___                   ____   _                                                10, 000. 00

                  4. MISSOURI RIVER AT FORT PECK, MONT.

  Location.-The site of the Fort Peck Reservoir is in the Missouri
River Valley in McCone, Valley, Garfield, and Phillips Counties,
Mont. The dam site is approximately 11 miles above the mouth of
Milk River in secs. 14, 15, 16, 21, 22, and 23, T. 26 N., R. 41 E. The
west (left) abutment is in Valley County and the east (right) abut-
ment is in McCone County. Nearest towns are Glasgow, 17 miles
northwest, and Nashua, 9 miles north.
  Existing project.-No work has been authorized by Congress. The
provision of an earth dam for impounding water for the improve-
ment of navigation on the Missouri River, Sioux City to the mouth,
  1Exclusive of available funds.
842      REPORT      OF CHIEF      OF ENGINEERS,       U.   S.   ARMY,   1934


as recommended by the Chief of Engineers, September 30, 1933, was
included in the Public Works program under the National Industrial
Recovery Act (H. Doc. No. 238, 73d Cong., 2d sess.).
  Detailed data regarding the dam are as follows:
                                         Description
Concrete spillway in right abutment, discharge capacity (second-
  feet) --     ---------------------------------------       ------             250, 000
Height of main dam above stream bed (feet) ----------------------                    240
Height of top of parapet wall above stream bed (feet)                                254
Crest elevation of dam (feet, mean sea level) __                                  2, 270
Tunnels for releasing water from reservoir (4), diameter (feet)__                     26
Maximum pool level (feet, mean sea level) ----------------------                  2, 250
Normal pool level (feet) ----------------                                         2, 246
Crest length of dam (feet) --------------------------------------                21, 160
Maximum storage capacity (acre-feet) ---------------                  19, 412, 000
Normal operating storage capacity (acre-feet) ------------------- 18, 400, 000
Total construction cost of reservoir (estimated) -----------------   $86, 000, 000
Annual operation and maintenance cost (estimated) --               _     $106, 000
Date construction started-------------------------------             Oct. 23, 1933
Estimated date of completion----------                                    Oct. -,   1939
Datum-mean sea level (1929 Adjustment U. S. Coast and Geodetic
  Survey).
   Terminal facilities.-The facilities are considered adequate for
existing commerce.
   Operations and results during fiscal year.-The work accomplished
during the fiscal year was as follows:
   Clearing of timber from the dam site was commenced on October
23, 1933, and was completed, with the exception of a small area of
the borrow pit, on December 10, 1933. The construction of four
diversion tunnels commenced on May 16, 1934, and the stripping of
the base of the dam commenced on June 19, 1934. Surveys and
borings necessary to the carrying out of the program were made.
Negotiations and acquirement of lands were commenced. Railroad
connection with the Great Northern Railroad at Wiota, Mont., has
been established and a line extended to the dam. site, comprising a
total main-line trackage of 76,353 feet and 46,670 feet of side tracks,
the cost of which was $612,705.77. The combination railroad and
highway bridge across the Missouri River at the dam site was com-
menced on February 28, 1934, and is 45 percent complete. A rail-
road trestle along the upstream toe of the dam on the right bank
was begun. The construction of dredging plant was commenced on
January 10, 1934, and the first dredge hull was launched on June 12,
1934. The construction of a 154,000-volt electric-power line from
Rainbow (near Great Falls, Mont.) to Fort Peck, about 287 miles,
was begun on May 21, 1934, and is 12 percent complete. Camp con-
struction, which includes quarters for labor, 12 permanent houses,
and 213 temporary houses, together with the necessary stores, office
and warehouse buildings, roadways, water, gas, electric, and sewer
lines, was commenced in the spring of 1934. This work is about
20 percent completed, the cost thereon for the fiscal year being
$1,408,046.97.
   The cost of new work during the fiscal year was $957,647.87. The
total expenditures were $3,659,557.40.
   Condition at end of fiscal year.-The dam site has been cleared
and grubbed. The borrow-pit area has been partially cleared and
                 RIVERS           AND HIARBORS-                 MISSOURI RIVER DIVISION                                                      843
grubbed. A Government-owned railroad from Wiota to Fort Peck
is in operation. The following work is in progress:
   Stripping of the dam site; construction of the four diversion tun-
nels; construction of a combination railroad and highway bridge
along the downstream toe of the darnm; construction of a railroad
trestle on the right bank along the upstream toe of the dam; construc-
tion of a town or camp, complete with electric, gas, water, road, and
sewer systems, for housing Government and contractors' employees;
construction of approximately 287 miles of 154,000-volt power line,
complete with necessary substations from Rainbow (near Great
Falls), to Fort Peck; construction of four 28-inch electric dredge
units, complete with necessary attendant plant. Permanent work on
the project is approximately 1 percent completed. The work remain-
ing. to be done to complete the project consists of the completion of
work in progress, constructing spillway, steel sheet piling cut-off
wall, dredging for earth fill, facing upstream slope of dam, lining
diversion tunnels, and acquisition of necessary lands.
   The cost of new work under the existing project, up to June 30,
1934, was $957,647.87. There were no maintenance costs. Expendi-
tures were $3,659,557.40.
   Proposed operations.-The balance unexpended ($21,340,442.60)
and accounts receivable ($2,882.45) at the end of the year, together
with an allotment of $25,000,000 made during July 1934, will be ap-
plied toward the completion of the Fort Peck Dam and Reservoir,
purchase of necessary land and plant, general supervision, surveys,
tests, and inspections. It is believed that available funds will be
exhausted by June 30, 1935. It is proposed to carry on operations
during the fiscal year 1935 as follows:

                                                                                                              Estimated
                                                                                                                date of              Amount
                                                                                                              completion

Accounts payable June 30, 1934 ...............-                     -       --..-----                    --                        $1, 573, 196. 80
New Work (July 1, 1934, to June 30, 1935), construction of Fort Peck Dam
and Reservoir, including all works incidental thereto:
   Existing contracts:
       Underpass and railroad bridge over Missouri River at Fort Peck
         dam site    -_- ____------------       -    --- -- --- --        - Aug. 30, 1934                                             605, 955. 57
       Trestle and track for upstream tunnel spur and upstream toe of dam_ Sept. 30, 1934                                             362, 268. 06
       Transmission line, Great Falls to Fort Peck             _            Oct. 30, 1934                                           1,064, 654. 54

         Substations:
              Rainbow -             -------- -------- -------- -------- -----
                            ---------                                                                     Sept. 30, 1934              221, 270. 00
              Fort Peck -- - -- - -- - -- - -- - -- - -- - -- - -- - -- -                                 - do       -                574, 055. 81
              Building at Fort Peck-          --                -       -                                 July 30, 1934                 5, 017. 56

                 Total-                                                                                                               800, 343.37

         Camp buildings:
            G roup 1 --- -- --- -- --- -- --- -- -- --- -- --- -- --- --                                  Sept. 30, 1934            1, 198, 903. 47
            Group 2-------                                                                                Oct. 30, 1934                691, 083. 55
            G roup 3 -- -- -- - -- -- - -- -- - -- -- -- - -- -- - ---                                        do- . .                  739, 908. 49

                 Total-       -     -    -        -   -         -       -        -      -      -         -       -            -     2, 629, 895.51

         Sewerage and water distribution system                         _                                     Aug. 30, 1934           105, 659. 31
         Water filtration and intake.         ..-------------                                             Sept. 30, 1934              137,   819. 73
         Electrical distribution system for construction camp-           __                                   Oct.    30,   1934        75, 982.   41
         Pavement, walks, and driveways for construction camp-............                                    Sept.   30,   1934       148, 249.   86
         Gravel roads, Fort Peck -------------------         -- -- ------ ----                                Aug.    30,   1934        40,;116.   95
         Diversion tunnels ------     _----------- ---------    - --                                          M ar.   15,   1936    7, 455, 260.   14
         Coarse aggregate and sand for diversion tunnels                                                      Oct.    30,   1934       230, 000.   00
         Left-bank trestle . .....-..                     .                  .          .            .            do                  156, 653. 66
         Overburden excavation and stripping                                                -..............   Dec. 30; 1934         1,380, 443. 83
         Test borings (2 contracts) ............              .........-                -                     July 30, 1934            22,,055. 45
844          REPORT OF CHIEF OF ENGINEERS,                                          U.     S. ARMY,                1934


                                                                                                      Estimated
                                                                                                        date of            Amount
                                                                                                      completion

New Work (July 1, 1934, to June 30, 1935), constuction of Fort Peck Dam
and Reservoir, including all works incidental thereto-Continued
   Existing contracts-Continued
       Dredge feeder lines ------.....................
       Cement for tunnels-------------------------------------
                                                                      __....                          Nov. 30,1934         $434, 341. 39,
                                                                                                      June 30,1935          541, 080. 00
           Total of existing contracts------
                                     ........-...................                                                  -.    16,190, 779. 78
        Agreements for electricity, telephone, gas, railroad hauling, etc                -- ---------------
                                                                                               1,775, 000. 00
                                                              .
        Plant, construction and purchase of by hired labor---------          _----------..
                                                                          ----.                3, 177, 000. 00
        Miscellaneous work by hired labor_---.--------------__              ----------_---197,         685. 86
           Total, agreements and hired-labor work-------....                 ------........-.
                                                                                      __                  .....           5, 149, 685. 86
    Proposed contracts:
        Cement for tunnels .         .....             ....                                                         609, 799. 77
                                                                         ....---------------------------------------------------
        Coarse aggregate and sand for diversion tunnels..                    ....------------------------------     720, 000. 00
        Spillway (first contract).....------------------------------- -------------.......... 13, 000, 000. 00
        Sheet piling, cut-off wall---------...     ----.                                                         2, 294, 862. 84
       Dam construction, gravel for upstream and downstream toe of dam_                         --------------   2, 625, 000. 00
        Steel lining for tunnels ..__--....-_-----   ......-......------- ..--....                               2, 700, 000. 00
          Total, proposed contracts ._-.----........                          ..--------...-                             21, 949, 662. 61
   Proposed work by hired labor:
       Acquisition of necessary land ....-------....--------------------..............---------------                       500, 000. 00,
       Dredging for earth fill, 4 dredges 3 months each (to move approxi-
          mately 8,000,000 cu. yds.)       .    --------------------------------------------                                980, 000.00
          Total, proposed hired-labor work .- __.-.-                                 --..-------
                                                                       ..- __.---------..                   ....          1,480, 000.00
          Total, new work                  .......-----------------      ----------------------------....                44, 770,128. 25


   It is impossible to give the exact time of completing the various
items of work, but with reasonable weather conditions all major
portions of the work will be well started during the fiscal year 1935.
All existing contracts will be completed by June 30, 1935, except the
first contract for tunnels, which will be completed by June 30, 1936.
Provided funds are made available, the entire dam and reservoir is
expected to be completed and in operation by October 1939.
   The additional sum of $20,000,000 can be profitably expended dur-
ing the fiscal year ending June 30, 1936, as follows:
New work (July 1, 1935, to June 30, 1936) :
   Lining of diversion tunnels with steel shell and concrete, and
     placing gates, etc. (contract) --------------------------    $5, 000, 000
   Spillway (second contract) ---                                    , 000, 000
                                                                   1------------------------------

Dam construction (hired labor) :
   Dredging 1 year, 4 dredges, 71/2 months each (to move approxi-
     mately 26,000,000 cubic yards) --------     ---------------- 5, 875, 000
   Producing paving rock for paving face of dam-----------------1, 000, 000
   Producing and placing rock and gravel for upstream and down-
     stream toes of dam-----------------       -------- --------- 3, 125, 000

            Total--            --------------                    ----------                                             10, 000, 000

Acquisition of land-----------------------------                                         ----------                      3, 000, 000
Power-plant construction (contract)                                                                                       , 000, 000
                                                                                                                         1-----------------------------

         Total proposed operations for fiscal year 1936--------------20, 000, 000
  It is estimated that at the close of the fiscal year ending June 30,
1936, all major preliminary operations, including construction of the
town site, construction of railroads, bridges, and power lines, will
have been completed; that the excavation for the four 26-foot tunnels
                 RIVERS AND HARBORS-MISSOURI                                             RIVER DIVISION                 845
aggregating 24,766 linear feet in length will have been completed,
and the concrete lining to be placed outside of the plate steel shell
reinforcing will have been completed; that the contract for the plac-
ing of the steel lining and the inner concrete lining for these tunnels
will have been awarded and actual construction commenced; that the
greater portion of the excavation for the spillway, estimated at ap-
proximately 12,000,000 cubic yards, and the concrete lining for this
channel, amounting to approximately 150,000 cubic yards; and that
34,000,000 cubic yards, or approximately one-third, of the earth fill
for the dam proper will have been placed.
                                         Cost and financial summary

Cost of new work to June 30, 1934_______________-------------                                                 $957, 647. 87
Cost of maintenance to June 30, 1934________

Total cost of permanent work to June 30, 1934______-----------                                               957, 647. 87
Value of plant, materials, etc., on hand June 30, 1934_ _____                                             4, 272, 223. 88

      Net total cost to June 30, 1934_____-- _____---__----           5, 229, 871. 75
Plus accounts receivable June 30, 1934_________...__..-____                2, 882. 45
      Gross total costs to June 30, 1934_ _--___-         -- __
                                                              --   _-5,  232, 754. 20
Minus accounts payable June 30, 1934------------------                1, 573, 196. 80
      Net total expenditures ---------------------------              3, 659, 557. 40
Unexpended balance June 30, 1934___                                  21, 340, 442. 60
      Total amount appropriated to June 30, 1934--------        __. 25, 000, 000. 00

    Fiscal year ending June 30                  1930                  1931               1932     1933               1934


Cost of new work------................------------------------ ---------------------------.................       $957, 647. 87
Cost of maintenance___---------------------
Total expended---                    -------------------------------------------------                           3, 659, 557. 40

Allotted------------------------------- -----------------                                                       25, 000, 000. 00


Amount allotted from National Industrial Recovery Act ap-
  proved June 16, 1933-        - -__                                  $25, 000, 000. 00
Gross amount expended__________________            $3, 659, 834. 20
Less :
    Reimbursements collected--------$119. 25
    Receipts from sales_____________ 157. 55
                                                             276. 80
                                                                        3, 659, 557.40
Balance unexpended June 30, 1934______________           ________      21, 340, 442. 60
Oustanding liabilities June 30, 1934__---   _____    $410, 768. 59
Amount covered by uncompleted contracts --         17, 204, 093. 84
                                                                       17, 614, 862. 43
       Balance available June 30, 1934___________-      __-____         3, 725, 580. 17
Accounts receivable June 30, 1934 __-- --.....      ____           -
                                                                ___--    -   2, 882. 45
Unobligated balance available June 30, 1934_______-______               3, 728, 462. 62
Amount allotted by Public Works Administration, emergency
  appropriation act, fiscal year 1935-- __-    __      -____________25, 000, 000. 00
       Balance available for fiscal year 1935___________________ 28, 728, 462. 62

Amount (estimated) required to be appropriated for comple-
tion of existing project 1__---___ ---                                                                  36, 000, 000. 00
Amount that can be profitably -expended in fiscal year ending
                                 - - - - - - - - - - - -
June 30, 1936 for new work                                   20, 000, 000. 00
   SExclusive of available funds.
846       REPORT      OF CHIEF OF ENGINEERS,                U.   S.   ARMY,    1934

                                 5. OSAGE RIVER, MO.

   Location.-This river, rising in eastern Kansas, flows easterly 516
miles in sinuous bends to the Missouri River, 129 miles above its
mouth and 14 miles below Jefferson City.
   Existing project.-This provides for a lock and dam and for open-
channel work consisting of wing dams and training walls, removal
of obstructions and dredging between the mouth and Warsaw, a
distance of 170 miles. However, actual improvement is being con-
fined to the section below the Bagnell Dam (mile 75.2) to obtain a
channel 80 feet wide and 3 feet deep at low water. Ordinary and
extreme fluctuations are 15 and 41 feet.
   The estimate of cost of new work, revised in 1928, is $250,000,
exclusive of Lock and Dam No. 1, for open-channel work as far as
Niaangua River. The latest (1928) approved estimate for annual
cost of maintenance is $12,500.
                            LOCK AND DAM NO. 1, OSAGE RIVER

Nearest railroad station--------------------- Osage City, Mo., 6 miles.
Distance above mouth of river                                 7.4 miles.
Lock dimensions--------------------------- 42 by 220 feet.
Lift of lock--            ---------------------------  _      16 feet.
Depth on lower miter sill at low water---------- 9 feet.
Character of foundation---------------------Piles in gravel.
Kind of dam_                                                            with movable crest.'
                                                              F------------------------------ixed
Type of construction                 -----------------------. Concrete.
Year completed             ----------------------------       Lock, 1906; dam, 1911.
Cost-------------------------------------                     $468,419.98
   The project was adopted by the River and Harbor Act of March
3, 1871 (H. Doc. No. 60, 41st Cong., 3d sess., Annual Report for 1871,
p. 327), which provided for deepening the channel over the shoals
by dredging as far as Roscoe, 238.5 miles above the mouth. It was
modified by the following river and harbor acts: The act of Septem-
ber 19, 1890, provided for commencement of construction of a lock
and dam; the act of March 3, 1899, provided for a lock and dam
(Annual Report for 1898, p. 3474); the act of June 24, 1902, de-
clared the river nonnavigable above the dividing line between Benton
and St. Clair Counties, Mo., 185 miles; and the act of March 4, 1904,
provided for the construction of a power dam without lock at War-
saw, Mo., 172 miles above the mouth, the act of January 14, 1901,
having authorized the construction of the dam. For latest published
map see Annual Report for 1911, page 2012.
   Terminal facilities.-On the Lake of the Ozarks there are numer-
ous private docks.
   Operations and results during fiscal year.-There were no opera-
tions during the fiscal year. Receipts from sales amounted to
$975.76. The total costs during the fiscal year amounted to minus
$414.30, all for maintenance; net expenditures were minus $975.76.
   Condition at end of fiscal year.-The existing project is 91 per-
cent complete as far as Bagnell Dam (Federal Power Commission
project no. 459, hydroelectric plant and dam, completed in 1931),
mile 75.2, or 4.7 miles above Bagnell, Mo. The river has been in good
   1 9-foot fixed dam of concrete with 7-foot mniovable crest of chanoine nickets and Chit-
tenden drum weirs.
                   RIVERS AND HARBORS-MISSOURI                                                                  RIVER DIVISION                           847
condition as far as Bagnell Dam, affording channel depths of 2 feet
or more. Light-draft traffic has been made feasible below mile 75.2,
throughout the year as a result of channel contraction, dredging, and
the removal of obstructions, except when blocked by ice.
   The net total expenditures on the project amount to $1,201,922.93"
to June 30, 1934. The cost of new work for the period July 1, 1903,.
to June 30, 1934, was $658,075.71 (including $468,419.98 for lock
and dam), and the cost of maintenance for the same period was
$543,847.22 (including $260,171.72 for maintenance and replacement
of lock and dam).
   Proposed operations.-No operations are proposed during the fiscal
year 1935. The sum of $3,000 can be profitably expended during the,
fiscal year 1936 for snagging operations and such emergency work
as may be necessary.
                                                     Cost and financial summary

Cost of new work to June 30, 1934-----------------                                                                                           $658, 075. 71
Cost of maintenance to June 30, 1934_---___-       -_ ____----543,                                                                                 847. 22

           Total cost of permanent work to June 30, 1934____________ 1, 201, 922. 93

Net total expenditures_ __-----1,                                                                                                             201, 922. 93
Total amount appropriated to June 30, 1934____________________                                                                             1, 201, 922. 93

          Fiscal year ending June 30                                              1930              1931               1932           1933            1934


Cost of new work-              .------
                              ---   --           -       -                                       ---------      -      -      -   ------     --       -- -
Cost of maintenancen-W
             wok..-                                                         $14, 36i. 82         $6, 155. 81          -$12. 00        $573. 63       -$414.     30°
Total expended-         -     - --   --   ----               -                9, 390. 65          -101. 33          -1, 360. 97   -1, 105. 72         -975. 76
A llotted -. -..   ..       . ..     . .. . ......               -- -   -     -    -     -   -      -   -      - -.                                 - 9, 077.   07
Balance unexpended July 1, 1933_                                                                                                                  $8, 101. 31
Deductions on account of revocation of allotment _____________                                                                                     9, 077. 07

      Net amount to be accounted for_______________-______                                                                                         -- 975. 76
Less receipts from sales ______________---------      $975. 76
                                                                                                                                                   --975. 76

Amount that can be profitably expended in fiscal year ending
June 30, 1936, for maintenance___ _-- ___---------_----__-                                                                                       3, 000. 00

      6. OPERATING AND CARE OF LOCK AND DAM, OSAGE RIVER

    The improvement for which report is made under this caption
forms part of the project for improving Osage River, Mo.                                                                                                 See
page 846, where general information regarding the improvement can
be found. The completed lock and dam has been operated and main-
tained under the permanent indefinite appropriation since July 1,
1912.
    Operations and results during fiscal year.--The structures were
maintained and operated in satisfactory condition. The total ex-
penditure during the fiscal year was $4,395.19.
   Condition at end of fiscal year.-The lock has been in operation
since March 1906 and the dam since February 1911, although the
         91536-ENG 1934--                            4
848         REPORT OF CHIEF OF ENGINEERS,                                                  U. S.           ARMY,        1934


latter was not entirely completed until January 1, 1914. Actual cost
of both structures was $728,591.70, of which $260,171.72 was expended
in reconstruction and repairs after partial failure of the dam. The
completed project affords a dependable channel depth of 3 feet at
low water to mile 21 above the mouth, or 14 miles above the dam.
There is a privately owned and operated dam on the Osage River
at mile 75.2. The total expenditures to the end of the fiscal year from
the indefinite appropriation amounted to $186,177.83.
   Proposed operations.-The lock and dam will be operated and
maintained under allotments from appropriations made available
for such purposes.
                                                Cost and financial summary
Cost of maintenance to June 30, 1984__---..__-.__- -     __-        $186, 211.43
Value of plant, materials, etc., on hand June 30, 1934-------------      -33.60

      Net total cost to June 30, 1934 .                                 ..-------------------------                           186, 177. 83
Net total expenditures------------------------------------                                                                         86, 177. 83
Unexpended balance June 30, 1934       ------------                                                                                 1,------
                                                                                                                                       031.82
        Total amount appropriated to June 30, 1934--
                                                 ....-                                                                            187, 2009. 65

        Fiscal year ending June 30                           1930                1931                   1932          1933             1934

Cost of new work        -    -       -      -   -   -         --        -      - - -                      - -- -                   -- - -
Cost of maintenance .             ..------------------   $13, 209. 44        $6, 366. 93              $8, 042. 23   $6, 212. 55       $4, 459. 96
Total expended........-----------------------             10, 151. 25          8, 447.86               8, 289. 57    6,239. 12         4, 395. 19
Allotted_     ..-----------------------------              8, 000. 00        10, 000. 00               8, 000. 00    5,909. 09         3, 470. 16


Balance unexpended July 1, 1933-------------- -----------                                                                          $1, 956.85
Amount allotted from permanent indefinite appropriation, sec.                                                                6,
  River and Harbor Act, Mar. 3, 1909-  ----     -      -                                                                            5, 350. 00
      Amount to be accounted for-----           __                                                                                  7, 306. 85
Deductions on account of revocation of impounded funds-----------                                                                   1, 879. 84

       Net amount to be accounted for ___---------           -___-__- 5, 427. 01
Gross amount expended-----________  ____          -_____ _ $4. 457. 39
Less reimbursements collected__----_-----------------           62. 20
                                                                       4, 395. 19

      Balance unexpended June 30, 1934_____________________                                                                         1, 031. 82
Outstanding liabilities June 30, 1934 ------- -      -_______-- ---                                                                    797. 74
     Balance available June 30, 1934_......__.-__-----------                                                                           234. 08
Amount allotted for fiscal year 1935.- -_----------_____                                                                            5, 700. 00
         Balance available for fiscal year 1935_----                                       ___-                     ____            5, 934.08
    7. EXAMINATIONS, SURVEYS, AND CONTINGENCIES (GENERAL)

  Kansas City district.-The cost of work during the year amounted
to $96,522 31; the expenditures were $95,928.12. The balance un-
expended June 30, 1934, together with accounts receivable and
amount allotted during fiscal year 1935, will be applied as needed
during the fiscal year 1935 to payment of expenses to be incurred in
connection with the above items. The additional sum of $20,000 can
be profitably expended during the fiscal year ending June 30, 1936.
   Oiaha dstrict.-The cost of work during the year amounted to
$2,405.69; the expenditures were $2,369.19. The balance unexpended
                     RIVERS AND I-IARBORS-1ISSOURI                                             RIVER DIVISION                                       849

June 30, 1934, together with amount allotted during fiscal year 1935,
will be applied as needed during the fiscal year 1935 to payment of
expenses to be incurred in connection with the above items. The
additional sum of $10,000 can be profitably expended during the fiscal
year ending June 30, 1936.
   Division revolving fund.-A net total expenditure of $30,099.60
was made by the Missouri River division from a monthly revolving
fund for division operations.
   The net total expenditures during the, year for all operations were
 $128,396.91, and the total cost was $98,928.
                                                   Cost and financial summary
Cost of maintenance to June 30, 1934---------------------------$351, 489. 36
Value of plant, materials, etc., on hand June 30, 1934------------26, 653. 96

      Net total cost to June 30, 1934____-______________-_     378, 143. 32
Plus accounts receivable June 30, 1934------------------------   3, 331. 50

      Gross total costs to June 30, 1934-------------------------                                                                   381, 474. 82
Minus accounts payable June 30, 1934----------------------------                                                                         339. 65
     Net total expenditures   ------------------------------          381, 135. 17
Unexpended balance June 30, 1934---------------------------            45, 065. 52
     Total amount appropriated to June 30, 1934_......       ____ --- 426, 200. 69

            Fiscal year ending June 30                                  1930           1931              1932               1933                   1934


Cost of new work .. .-                                  .-.             - --. .-..
                                                                      .-.                          . .   .      .   . .        ..       .     .     .     .
Cost of maintenance...------------------ $13, 118. 65                               $47, 292. 46 $157, 625.82         $34, 524. 43            $98, 928. 00
Total expended_-              -----------------------                 12, 967. 14    47, 066. 27     157, 709. 89         34, 994. 96         128, 396. 91
Allotted.......---.......................--------------------------    8, 500. 00    50, 000. 00     150, 000. 00     115, 003. 64                92, 197. 05


Balance unexpended July 1, 1933          -----------              $81, 265. 38
Amount allotted from War Department Appropriation
  Act approved July 14, 1932___________________      $78, 000. 00
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933----------------------20, 000. 00
                                                                   98, 000. 00
     Amount to be accounted for ____________________                                                                 ____           179, 265. 38
Deductions on account of revocation of impounded funds                                                       ---------                5, 802. 95
       Net amount to be accounted for------------------------173, 462. 43
Gross amount expended------------------------ $343,311. 55
Less:
     Reimbursements collected ----------  $214, 891. 98
     Receipts from sales-----------------        22. 66
                                               -        214, 914. 64
                                                                     128, 396. 91
       Balance unexpended June 30, 1934----------------------                                                                               45, 065. 52
Outstanding liabilities June 30, 1934____-___.__________ ___                                                                                4, 236. 58
       Balance available June 30, 1934------------------------                                                                              40, 828. 94
Accounts receivable June 30, 1934_____- -_______-____________                                                                               3, 331. 50
              Unobligated balance available June 30, 1934 _______________                                                                   44, 160. 44
Amount that can be profitably expended in fiscal year ending June
  30, 1936, for maintenance 1---   ----        --          -    -                                                                           30, 000. 00
     1Exclusive of available funds.
850        REPORT           OF   CHIEF       OF    ENGINEERS,              U.    S.    ARMY,        1934


               8.     Other projects for which no estimates are submitted

                    [Commercial statistics for these projects are given in pt. 2 of report]


                                                             For last    Cost and expenditures to
                                                              full re-         June 30, 1934                Estimated
                     Name of project                         port see                                       amount re-
                                                              annual                                         quired to
                                                              report     New work        Maintenance         complete
                                                               for-


1. Missouri River at and near the towns of Nio-
    brara, Nebr., and Yankton, S. Dak.1 __....._               1932       _                                  $170, 000. 00
2. Gasconade River, Mo.2 _.                                    1931      $139, 003. 21     $85, 076. 57         (3)
3. Yellowstone River, N. Dak., Mont., and Wyo.4__              1900       122, 029. 59    -(5)


  I Awaiting local cooperation.
2 Present conditions adequate for existing needs.            Curtailment of project recommended in H. Doc.
No. 467, 69th Cong., 1st sess.
34 Maintenance only.
    Abandonment approved in 1902.
  b Completed.




Status of reports called for by river and harbor acts and committee resolutions

                                                        Transmitted             Document no.              Recommenda-
        Locality             Authorization act
                             Authorization
                      Locality             act          to Congress                                           tion


Kansas (Kaw) River,          River and Harbor           Dec. 13, 1933             __                      Unfavorable.
Kans. and Mo.                 Act, July 3, 1930.
Missouri River, from          _---do-
Kansas City, Mo., to
Yankton, S. Dak.
Missouri River from           River and Harbor
Quindaro Bend to its          Act, Jan. 21, 1927.
mouth.
Missouri River from           River and Harbor           -
Sioux City, Iowa, to          Act, July 3, 190.
mouth of Yellowstone
River, N. Dak.



   IMPROVEMENT OF RIVERS AND HARBORS IN THE
             CHICAGO, ILL., DISTRICT
   This district lies partly within the upper Mississippi Valley divi-
sion and partly within the Great Lakes division. The. portion.
within the upper Mississippi Valley division includes the Illinois
River and its tributaries in Illinois, Indiana, and Wisconsin, together
with connecting waterways to the heads of Federal projects on the
Chicago and Calumet Rivers.
   The portion within the Great Lakes division includes the harbors
on Lake Michigan from Waukegan, Ill., to Michigan City, Ind.,
inclusive, together with the navigable waterways entering Lake
Michigan at Chicago and Michigan City, or between them, and the
navigable tributaries of such waterways.
   On November 16, 1933, the first and second Chicago districts were
combined to form the Chicago district.
   District engineer: Former second Chicago district, Col. W. G.
Caples, Corps of Engineers, to November 16, 1933.                                                Since that date,
district engineer, Chicago district, Lt.                              Col. Dan I. Sultan, Corps of
Engineers.
  Division engineer, upper Mississippi                                Valley division: Col. George
R. Spaulding, Corps of Engineers, to                                  November 27, 1933. Lt. Col.
E. L. Daley, Corps of Engineers, since                                that date.
              RIVERS AND HARBORS-CHICAGO,               ILL.,   DISTRICT          851
  Division engineer , Great Lakes division: Col. E. M. Markham,
Corps of Engineers, to October 18, 1933. Lt. Col. Max C. Tyler,
*Corpsof Engineers, since that date.
                                      IMPROVEMENTS

                                       Page                                       Page
   (Upper Mississippi Valley                     (Great Lakes Division)
          Division)                           4. Waukegan Harbor, Ill____         867
1. Illinois   River,   Ill ..-.....     851   5. Chicago   Harbor,   Ill_______   870
2. Operating and care of locks                6. Chicago River, Ill               873
    and dams, Illinois River,                 7. Calumet Harbor and River,
     Ill -----------------------        864        Ill. and Ind(l___              875
:3.Examinations, surveys, and                 8. Indiana Harbor,     idd
                                                                     .881
     contingencies     (general)        867   9. Michigan City Harbor, Ind_       887
                                              10. Examinations, surveys, and
                                                   contingencies (general) __     890
                             1. ILLINOIS RIVER, ILL.

  Location.--The Illinois River (entirely within the State of Illi-
nois), formed by the confluence of the Kankakee and the Des Plaines
Rivers, flows in a southwesterly direction and enters the Mississippi
at Grafton, Ill., about 38 miles above St. Louis.
  The Illinois Waterway extends from the upper end of the Federal
project on the Illinois River at Starved Rock, near Utica, to Lock-
port, a distance of 60 miles. At Lockport connection is made with
the Chicago Sanitary and Ship Canal, which extends 30 miles from
Lockport Lock to the west fork of the south branch of the Chicago
River at Damen Avenue, 6.1 miles from Lake Michigan. At a point
12.4 miles from Lockport Lock the Calumet-Sag Channel, 16.2 miles
long, joins the Chicago Sanitary Canal with the Little Calumet
River at Blue Island, Ill., at a point 14.2 miles from Lake Michigan
via the Little Calumet and Calumet Rivers. (For further detailed
description see p. 1171 of Annual Report for 1932.)
  Previous projects.-The original project was adopted by the River
and Harbor Acts of August 30, 1852: April 10, 1869; July 11, 1870;
June 14, 1880, and March 2, 1907. The cost of work under these
projects was $3,017,370.06, of which $2,569,102.04 was for new work
and $448,268.02 was for maintenance. The expenditures were
$3,144,650. (For further details see p. 1945 of Annual Report for
1915 and p. 1172 of Annual Report for 1932.)
   Existing project.-This provides for a channel with least dimen-
sions of 9 feet in depth and 200 feet wide from the mouth of the
Illinois River to Utica, Ill., and a navigable channel with a mini-
mum depth of 9 feet from Utica to the heads of the Federal projects
on the Chicago and Calumet Rivers.
  The existing project was authorized by the River and Harbor
Acts of January 21, 1927, and July 3, 1930. The act of January 21,
1927, provided for a channel with least dimensions of 9 feet in depth
and 200 feet wide from the mouth of the Illinois River to Utica, a
distance of 230 miles; for the modification of the two United States
locks and dams and for the removal of the two State dams when title
thereto had been transferred to the United States. (Rivers and
Harbors Committee Doc. No. 4, 69th Cong.. 1st sess., and S. Doc.
No. 130, 69th Cong., 1st sess.) The act in adopting the project
852     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                 1934

authorized the appropriation of not to exceed $3,500,000 for carry-
ing on the work.
  The act of July 3, 1930, provided for an extension of the project
so as to provide a navigable channel depth of not less than 9 feet
from Utica, Ill., to the heads of the present Federal projects on the
Chicago and Calumet Rivers, distances of 96.1 miles (to Lake
Street) and 98.2 miles (to Turning Basin No. 5), respectively, to
be secured by means of completed dams, locks, lateral canals, and
dredging begun by the State of Illinois, in general accordance with
the present plans of the State for that work. (S. Doc. No. 126, 71st
Cong., 2d sess.) The act in adopting the project authorized the
appropriation of not to exceed $7,500,000 for carrying on the work.
  The total amount authorized to be appropriated is $11,000,000 for
new work, in addition to amounts expended on previous projects.
The estimated cost of annual maintenance is $373,000.
  The act of 1930 in adopting the extension of the project provides-
   That the said project shall be so constructed as to require the smallest flow
of water with which said project can be practically accomplished in the
development of a commercially useful waterway; that the water authorized
at Lockport, Ill., by the decree of the Supreme Court of the United States,
rendered April 21, 1930, and reported in volume 281, United States Reports, in
cases nos. 7, 11, and 12, original; October term, 1929, of Wisconsin and others
against Illinois and others, and Michigan against Illinois and others, and New
York against Illinois and others, according to the opinion of the Court in the
cases reported as Wisconsin against Illinois, in volume 281, United States Re-
ports, page 179, is hereby authorized to be used for the navigation of said
waterway :
   That as soon as practicable after the Illinois Waterway shall have been
completed in accordance with this act, the Secretary of War shall cause a
study of the amount of water that will be required as an annual average flow
to meet the needs of a commercially useful waterway as defined in said Senate
document (S. Doc. No. 126, 71st Cong., 2d sess.), and shall, on or before Janu-
ary 31, 1938, report to the Congress the results of such study with his recom-
mendations as to the minimum amount of such flow that will be required
annually to meet the needs of such waterway and that will not substantially
injure the existing navigation on the Great Lakes to the end that Congress
may take such action as it may deem advisable.
   That the project thus adopted shall be in all its parts a navigable waterway
of the United States, forever free to the public use of all, unencumbered by any
tolls or restrictions of any kind whatsoever except such as may be imposed
by Congress.
   That no claim shall lie against the United States because of any contractual
obligations which have been or may be entered into by the State of Illinois as
regards the construction of a waterway between Utica and Lake Michigan.
  Locks and dams forming a part of the project are described in
the following table:
                                                                   Illinois River from the mouth to Utica

                                        Location                          Dimensions                   Depth on miter sills                     Character of foundation
                                                                                                         at low water
                                                                   I
                                                                                             Lift at
                                                                                   Avail-     low
     Name of lock        Miles                                                      able     water,
                         above            Nearest town                 Width of
                                                                                  length       1927                                      Lock                             Dam
                         mouth                                         chamber    for full   project    Lower     Upper
                                                                                   width                                                                                                     ~F1
                                                                                                                         ~
                                                                                                                                                                                             m
                                                                         Feet      Feet       Feet       Feet      If eea
                                                                                                                    AM


                                                                                                                              Piles in clay and sandd-...   Piles in clay and sand.
Kampsville                  31. 5   Kampsville, Ill____________              73       300       6. 2         10               Pieimdn
                                                                                                                              Piles in mud and sand__--     Piles in mud and sand.
                 ..
La Grange.________..        77. 5   Versailles, Ill--------_____            73        300       4. 7         11
                                                                                                                                                                                             td
                                                                                                         Type of construction                               Percent-
               Name                                Kind of dam                                                                                               age     comple-     Cost        0
                                                                                                                                                            comple-    ticomple- Cost            {
                                                                                               Lock                                  Dam                      tion      tion                 0




Kampsville --------------------         Fixed---------------------- Masonry-------------------- Pile .....----------------------------                          100       1893   $444, 100
La Grange ---          ------ -------------do- .....---------- --------.......----- do------------------------- do--------------------------                    100       1889    485, 034
                                                                                                                                                                                             0

                                                                                                                                                                                             0




                                                                                                                                                                                             t/2
                                                                                                                                                                                             H

                                                                                                                                                                                             0
                                                                                                                                                                                             H




                                                                                                                                                                                             C0
                                                                   Illinois waterway from Utica to Lockport

                                                                                  Location                                         Dimensions                              Depth on miter sills 1
                                                                          --                  i                         I

                   Name of lock                                                                                                                                Lift at
                                                                                                                                           Available         low water 1
                                               Miles above                                                                   Width of
                                                 mouth                                Nearest town                           chamber
                                                                                                                                           length for                       Lower          Upper
                                                                                                                                           full width


                                                                                                                                 Feet           Feet        Feet             Feet            Feet             0
Starved Rock__                                       231.0    Utica, Ill......                                                       110            600        16. 3         2 14. 8            16. 85         j
Marseilles _....                                     244. 5   Marseilles, Ill_                                                       110            600        24. 25          14. 0            18. 6
Dresden Island_                                      271. 5   Morris, Ill ...                                                        110            600        21. 75          12. 25           16. 85        C
Brandon Road_
Lockport_
                                                     286. 0
                                                     291. 1
                                                                        ----
                                                              Joliet, Ill
                                                              Lockport, Ill__
                                                                                                                                     110
                                                                                                                                     110
                                                                                                                                                    600        34. 0
                                                                                                                                                    600 1331.5-41.0
                                                                                                                                                                               13.8
                                                                                                                                                                               15. 0
                                                                                                                                                                                                   17.85
                                                                                                                                                                                        3 11.5-22. 0
                                                                                                                                                                                                              4H
                                                                                                                             Character of founda-
                                                                                       Type of construction                  Character of founda-
                                                                                                                                    tion                                                Ccost to the
                                                                                                                                                            Percentage
              Name                            Kind of dam                                                                                                                Year of
                                                                                                                                                            of comple- completion
                                                                                                                                                                                          United
                                                                                                                                                               tion                      States for
                                                                               Lock                  Dam                       Lock             Dam                                       mpletion 4
                                                                                                                                                                                        co]


Starved Rock             ___        Movable (taintor gates)---------     Concrete__ Concrete and structural steel-...       Rock           Rock .....              100      1933         $777,    676.   46   z

Marseilles -------------------         do_                                _do-.       . do-      -_do                           .....        .-do . - .   .100              1933        1, 659,   945.   61   M

Dresden Island-----------             do                                  _do .        .do_     -do                                         -do                    100      1933        2, 287,   158.   17
Brandon Road-     -     -    ---       do                                 _do     .      do                    -              do           -do_.                   100      1933        1, 524,   474.   94
Lockport-----     ----------        Movable (sector gates)               _do        _    do                                   do    -          do-                 100      1933            52,   109.   15

   1 Lifts and depths on miter sills are those obtainable with flat pools.
   2Depths on lower miter sill is that which will obtain after construction of new dam at Peoria and a minimum flow of 2,900 c. f. s. at Starved Rock Lock (2,400 c. f. s. at Lockport).                      CIl




   3 Variation in lift and depth on upper miter sill at Lockport is due to fluctuation of water surface in the Sanitary District Canal.
   4 Cost to the United States for completion includes all pool costs (dredging, clearing, etc.) except flowage easements.




                                                                                                                                                                                                              03-
          RIVERS AND HARBORS-CHICAGO,         ILL., DISTRICT      855
   The latest published map and profile of the Illinois and Des
Plaines Rivers are contained in House Document No. 184, Seventy-
third Congress, second session, and a map of the Calumet-Sag
Channel is printed in House Document No. 180, Seventy-third Con-
gress, second session.
   Recommended modifications of project. Under date of December
6, 1933, the Chief of Engineers recommended that the project be
modified so that the slack-watering of the river be completed by the
construction of modern locks and dams at La Grange and Peoria,
and that to provide a fully useful commercial waterway the project
for the improvement be modified to provide for a channel at least
9 feet deep and 300 feet wide below Lockport, at an estimated cost of
$15,530,000 with $350,000 annually for the operation and care of
locks and dams and $150,000 annually for channel maintenance
 (H. Doc. No. 184, 73d Cong., 2d sess.).
   Under date of December 9, 1933, the Chief of Engineers recom-
mended that the further improvement of the Illinois Waterway
system is advisable to provide channel 9 feet deep and 300 feet wide
in Calumet and Little Calumet Rivers, from Turning Basin No. 5
at the head of the present deep-draft channel to the eastern end of
the Sag Channel, for three passing places along the Sag Channel 9
feet deep and 150 feet wide, and for dredging areas at the entrance
and to the south end of Lake Calumet to a depth of 21 feet at an
estimated cost of $2,814,500 with an annual maintenance at $85,000
in addition to that now authorized; subject to certain conditions of
local cooperation (H. Doc. No. 180, 73d Cong. 2d sess.).
   Local cooperation.-The River and Harbor Act of January 21,
1927, modified the existing project subject to the condition that the
State of Illinois transfer to the United States without cost all rights
and titles in the two State-owned dams on the Illinois River, and that
local interests furnish the United States without cost all necessary
areas for the disposal of materials dredged in creating and maintain-
ing' the channel authorized. By deed dated March 28, 1928, the
State of Illinois transferred these locks and dams to the United
States.
   Permission has been granted by many riparian landowners for use
of their lands for the disposal of dredged material.
   The State of Illinois appropriated $20,000,000 for the construction
of a waterway providing minimum 8-foot depths in channels not less
than 150 feet wide, from the upper end of the Federal project on the
Illinois River to Lockport. The lock and dam at Starved Rock was
about 95 percent complete, the Marseilles Lock was about 95 percent,
the Marseilles Canal 98 percent, Dresden Island Lock and Dam about
20 percent, Brandon Road Lock and Dam about 70 percent, and the
Lockport Lock about 95 percent complete before the passage of the
River and Harbor Act of July 3, 1930, which requires that the State
of Illinois shall proceed, subject to the supervision and approval of
all expenditures and obligations by the Secretary of War, to con-
struct the highway bridges at the Brandon Road and Marseilles
Canal, to make the necessary alterations in other highway bridges
across the Illinois Waterway, to make the necessary arrangements
and agreements for the alterations of the railroad bridges across
856    REPORT OF CHIEF OF ENGINEERS,       U.   S.   ARMY,   1934

said waterway, and to do such other work on said waterway as the
Secretary of War shall direct and the available funds of the State
make possible; the bridges mentioned not to become the property of
the United States, and no obligations to be incurred by the United
States to maintain, operate, or replace them. For further details see
page 1176 of Annual Report for 1932.
   Terminal facilities.-Of the 13 principal cities and towns along
the Illinois River, about 5 own dock frontage, more or less improved
for boat landings; 4 own dock frontage with no improvements; and 4
own no frontage except at street ends. Grain elevators are available
at 18 points between Grafton and Hennepin where grain can be
loaded directly into barges. A cement-loading plant is located at
Peru.
   At Peoria, the largest city on the river, a municipal terminal has
been constructed. Of an available frontage of 1,100 feet, 205 is
occupied by a dock house and 190 feet by an open dock. The dock
house is served by a wharf boat 45 feet by 230 feet, and an escalator
capable of handling 1,000 tons a day.
             OPERATIONS AND RESULTS DURING FISCAL YEAR

   Mouth to Utica, Il.-Regular funds-New work.-Operations
have been in progress throughout the year. A total of 1,983,427
cubic yards of material was dredged from the channel by contract.
   Surveys in connection with widening the channel were continued.
Monuments marking locations of proposed locks and dams near miles
80 and 158 have been placed.
   Improvement of boat yard at Peoria, Ill., by contract and hired
labor was continued. The breakwater and bulkhead were completed
in October 1933.
   Maintenance.-A total of 508,180 cubic yards of material, was
dredged from the channel by contract, 73,162 cubic yards of ma-
terial was dredged from the channel by hired labor and Govern-
ment plant, and 10,673 cubic yards of material removed by hired
plant.
   Surveys in connection with maintenance dredging were continued.
   A total.of 25 snags was removed at a cost of $729.74.
   Discharge observations were taken throughout the year at seven
different points on the river. Gage readings were continued.
   The total cost of the work for this section was $386,544.39, of
which $232,665.75 was for new work and $153,878.64 for maintenance.
The total expenditures were $349,293.42. All from regular funds.
   Utica, Ill., to heads of Federal projects on the Chicago and Calu-
met Rivers.-Contracts covering boiler houses at Dresden Island,
Marseilles, and Starved Rock; lockkeepers' dwellings at Starved
Rock and Marseilles; dredging in Starved Rock Pool; dredging in
Marseilles Pool; and dredging to improve critical points in all pools,
were awarded.
   Portion of the Brandon Road Pool near Ruby Street was dredged
by hired plant.
   Flowage easements were secured "r the Dresden Island and
Brandon Road Pools.
          RIVERS   AND HIARBORS-CHICAGO,     ILL., DISTRICT      857
  Starved Rock Lock and Dam-New work.-Lockkeepers' dwell-
ings were constructed at a cost of $12,769.17. In the pool and chan-
nel 5,375.1 cubic yards of earth and 16,875.9 cubic yards of rock were
removed by contract at a cost of $13,644.47.
  Marseilles Pool.--Portions of the pool were dredged by contract,
429,017 cubic yards of earth and 30,652 cubic yards of rock being
removed at a cost of $226,662.53.
   Marseilles Lock and Dam.-Lockkeepers' dwellings were con-
structed at a cost of $11,425.23.
   Dresden Island Pool.-Flowage easements were secured at a cost
of $3,109.58.
   Brandon Road Pool.-Flowage easements were secured at a cost
of $11,081.61.
   Miscellaneous work was done at a cost of $432.95.
   Maintenance.--Contractwork was as follows:
   Starved Rock Lock and Dam.--A boiler house was constructed at
a cost of $11,499.54.
   Marseilles Lock and Dam.-A boiler house was constructed at a
cost of $22,428.0.
   Dresden Island Lock and Dam..-A boiler house was constructed
at a cost of $11,470.38.
   Pools.--A total of 60 snags has been removed. The cost was
$643.44.
   In the Starved Rock Pool portions of the pool were dredged by
contract at a cost of $4,176; by hired labor the cost was $3,898.25.
   In the Marseilles Pool portions of the pool were dredged; by con.
tract the cost was $1,276; by hired labor the cost was $3,986.89.
   In the Dresden Island Pool portions of the pool were dredged.
The cost was $37,977.17.
   In the Brandon Road Pool portions of the pool were dredged.
The cost was $9,558.
   Miter gate seals were installed at Starved Rock at a cost of
$1,443.83, at Brandon Road Lock at a cost of $1,340.86, and at Lock-
port at a cost of $719.46.
   A buffer barge was placed near the old E. J. & E. Ry. bridge
in the Brandon Road Pool at a cost of $2,901.16.
   Other miscellaneous work was done at a cost of $47,648.40.
   The total cost of the work for this section was $429,607.12, of
which $262,896.15 was for new work and $166,710.97 for mainte-
nance. The total expenditures were $691,132.33.
   The total cost for the two sections was $816,151.51, of which
$495,561.90 was for new work and $320,589.61 for maintenance.
The total expenditures were $1,040,425.75, all maintenance and
improvement funds.
   Public Works funds.-Contracts covering cutting stop-log recesses
at Starved Rock, Marseilles, Brandon Road, and Lockport Locks;
lock-keepers' dwellings, Dresden Island Lock; alteration to lower ap-
proach walls at Marseilles and Starved Rock Locks; altering man-
holes at Brandon Road Pool; snubbing posts and fenders at Bran-
don Road Pool; road construction at Goose Lake pump house,
Dresden Island Pool; splashboards at Dresden Island and Starved
858    REPORT   OF   CHIEF OF ENGINEERS,   U.   S.   ARMY,   1934

Rock Dams; lighting at Starved Rock, Marseilles, Dresden Island,.
and Brandon Road Dams; Wall Extension No. 2, Joliet Walls, Bran-
don Road Pool; fire protection, water distribution, and sewer system
at Starved Rock, Marseilles, Dresden Island, and Brandon Road;:
winter program, Starved Rock, Marseilles, Brandon Road, and Lock-
port; standby power units all locks; Channahon Road, Dresden
Island Pool; and dredging portions of Brandon Road, Marseilles,
and Dresden Island Pools were awarded.
   New work.-Contract work was as follows:
   An emergency dam was constructed for use at all locks at a cost
of $16,508.40.
   Starved Rock Lock and Da~i.-Stop-log recesses were cut at a cost.
of $12,676.52. The alteration to lower approach wall was completed
at a cost of $53,654.65. Splashboards were installed. The cost was
$3,197.11. Lighting of the lock and dam was completed for $3,866.01L
Fire protection, water distribution, and sewer system were installed.
The cost was $7,245.82. Work was started on the stand-by power
unit and 44.97 percent completed. The cost was $3,935.97. A winter
program of repairing the lock gates was completed at a cost of
$45,137.42.
   Marseilles Lock and Dam.-Stop-log recesses were cut at a cost of'
$11,782.80. The alteration to the lower approach wall was completed
at a cost of $13,664.17. Lighting of lock and dam was completed
for $6,933.20. Fire protection, water distribution, and sewer system
were installed. The cost was $7,528.07. Work was started on the
stand-by power unit and 47.59 percent completed. The cost was:
$4,165.23. A winter program of repairing the lock gates was com-
pleted at a cost of $52,457.
   Dresden Island Lock and Dam.-Lockkeepers' dwellings were
coinpleted at a cost of $17,568.14. Splashboards were installed on
the dam at a cost of $2,847.47. Lighting of lock and dam was com-
pleted at a cost of $3,706.62. Fire protection, water distribution,
and sewer system were installed. The cost was $9,395.97. Work
was started on the stand-by power unit and 71.18 percent completed.
The cost was $6,229.68.
   Brandon Road Lock and Dam .- Stop-log recesses, including stop-
logs, were constructed at a cost of $16,528.88. Lighting of lock and
dam was completed at a cost of. $8,745.15. Fire protection, water
distribution, and sewer system were installed. The cost was $540.88.
Work was started on the stand-by power unit and 47.88 percent coin-
pleted. The cost was $4,190.67. A winter program of repairing
the lock gates was completed at a cost of $35,645.16. Critical points
were dredged by contract. A total of 38,259 cubic yards of material
was removed at a cost of $154,432.52.
  Lockport Look.-Stop-log recesses, including stop logs, were con-
structed at a cost of $29,413.32. Work was started on the stand-by
power units and 65.06 percent completed. The cost was $5,693.69.
   Pools.-In Brandon Road Pool manholes were altered, snubbing
posts and fenders were installed, and Joliet wall extension no. 2,
completed, at a cost of $94,517.72. Dredging to improve channel was
completed. A total of 80,948 cubic yards of material other than
rock was' removed and 24,671 cubic yards of back fill was placed at
a cost of $72,241.80.
          RIVERS AND HARBORS-CHICAGO,       ILL., DISTRICT      859
  In the Dresden Island Pool, Channahon Road and a road to the
Goose Lake pumphouse were constructed. The cost was $20,729.24.
A total of 252,729 cubic yards of material was removed by contract
at a cost of $90,930.52.
  Dredging in the Marseilles pool to improve channel was completed
by the removal of 89,056 cubic yards of excavation other than rock
at a cost of $34,195.04.
  The total cost of the work for this section with Public Works
funds was $852,687.42. Expenditures were $817,003.70.
  The total cost for this section, all funds, was $1,282,294.54, of
which $1,115,583.57 was for new work and $166,710.97 for mainte-
nance. The total expenditures were $1,508,136.03.
  Total cost for the two sections, all funds, was $1,668,838.93, of
which $1,348,249.32 was for new work and $320,589.61 for mainte-
nance. The total expenditures were $1,857,429.45.
                  CONDITION AT END OF FISCAL YEAR


   Mouth to Utica, Ill.-The project as modified by the act of Jan-
uary 21, 1927, is complete, except for dredging to increase channel
widths at bends and other restricted points. At Kampsville the
controlling depth of the river, as it prevails with a flow of 6,500
cubic feet per second through the Chicago Sanitary Canal (author-
ized until Dec. 31, 1935), was 9 feet. Due to the lowering of Kamps-
ville Dam 2 feet in 1905-6 by the Sanitary District of Chicago under
permit of the Secretary of War, the controlling low-water depth over
the upper miter sill at Kampsville Lock was 6.5 feet. The restora-
tion of the original height of a part of the Kampsville Dam during
May and June 1931 has increased this depth to approximately 9 feet.
   The total cost under existing project for this section to June 30, <
1934, was $3,064,475.07, of which $2,760,130.99 was for new work and
$304,344.08 for maintenance. The total expenditures were $3,110,-
120.86. All from regular funds.
   Utica, Ill., to heads of Federal projects on the Chicago and Cal-
umet Rivers.-In the section between Utica and Lockport, Ill., com-
prising the upper 43 miles of the Illinois and the lower 18 miles of
the Des Plaines Rivers, the channels in their present condition are
navigable. At the E. J. & E. Ry. bridge, near Devine, Ill., mile
270.6, the horizontal clearance is 113 feet. The vertical clearance is
limited to 21.5 feet at ordinary pool stage at the Morris Highway
Br.idge, Morris, Ill., mile 263.2; a new bridge is under construction.
Channel depths of 9 feet are available throughout the section.
   Prior to the adoption of the Federal project, the Sanitary District
of Chicago had constructed a channel (the Chicago Sanitary Canal)
having a.minimum width of 160 feet and a controlling depth of 20
feet at normal water level between Lockport Lock and the head of
Federal navigation on the Chicago River, and a channel (the Calu-
met-Sag Channel) 16.2 miles: long with a minimum surface width
of 60 feet (50 feet at the controlling works lock at Blue Island, Ill.),
minimum bottom width of 36 feet, and a constructed depth of 20
feet (the depth in the channel is now restricted to not more than
9 feet by silting just below the controlling works) connecting the
860      REPORT OF CHIEF OF ENGINEERS,                               U.   S. ARMY,   1934

Chicago Sanitary Canal with the head of Federal navigation on the
Calumet River.
   Five locks and four dams are complete.
   The following work remains to be done to complete the project:
Permanent control houses at Brandon Road and Dresden Island,
lockkeepers' dwellings at Brandon Road and Lockport Locks, im-
provement of channels at Ruby Street, and miscellaneous small items
of work. The existing project is 99 percent complete.
   The cost under the existing project for this section to June 30,
1934, was $6,942,196.23, of which $6,723,281.78 was for new work
and $218,914.45 for maintenance. The total expenditures were
$6,915,529.39, all regular funds. With Public Works funds the cost
was $852,687.42 for new work, and the total expenditures $817,003.70.
The total cost, all funds, was $7,794,883.65, of which $7,575,969.20
was for new work and $218,914.45 for maintenance. Total expendi-
tures were $7,732,533.09.
   The total cost of the existing project for the two sections from
the mouth of the Illinois to the heads of Federal projects on the
Chicago and Calumet Rivers to June 30, 1934, was $10,006,671.30, of
which $9,483,412.77 was for new work and $523,258.53 for mainte-
nance. The total expenditures were $10,025,650.25, all regular funds.
With Public Works funds the cost was $852,687.42 for new work
and the total expenditures $817,003.70. The grand total cost, all
funds, was $10,859,358.72, of which $10,336,100.19 was for new work
and $523,258.53 for maintenance. The grand total expenditures
were $10,842,653.95.

                   PROPOSED OPERATIONS,             MOUTH TO UTICA, ILL.


  Regular funds.-The balance unexpended ($315,810.03), including
accounts receivable ($15,060.19) at the end of the year, a total of
$330,870.22, will be applied as follows:
Accounts payable June 30, 1934________________________________ $41, 090'. 69
New work: Completion of existing contracts for dredging between
  miles 56.5 and 220.5, July to October 1934--------------------       16, 408. 00
Maintenance: Miscellaneous surveys, including cross-sec-
  tions, discharge observations, and maintenance of gages__ $30, 000
     Operating snag and dredge boats-------------------        2, 000
     Dredging to maintain channel depths and width, by con-
       tract or hired labor, July 1934 to June 1935 ........ 216, 000
                                                                      248, 000. 00

      Total ---------------------------------------         305, 498. 69
Balance remaining   --------------------------------------- 25, 371. 53

      Total------------------_              --------------------------                 330, 870. 22
  The additional sum of $266,000 can be profitably expended during
the fiscal year 1936 as follows:
Maintenance dredging-------------------------------------- $210, 000
Miscellaneous surveys, including cross-sections, discharge observa-
tions, and maintenance of gages------------------------------      35, 000
Operating snag and dredge boats --------------------------------     3, 000
Boat yard at Peoria   -----------------------------------------     18, 003
      Total- ---            -------------------                                             266, 000
                RIVERS AND HARBORS-CHICAGO,                      ILL.,        DISTRICT          861
   The contemplated work will provide a channel with least dimen-
sion of 9 feet in depth and 200 feet in width, widened at bends and
critical areas, from the mouth to Utica, Ill.
  Proposed operations, Utica, Ill., to heads of Federal projects on
the Chicago and Calumet Rivers--Regular funds.-The balance un-
expended ($581,572.70), including accounts receivable ($12,042.81)
at the end of the year, a total of $593,615.51 will be applied as
follows:
Accounts payable June 30, 1934_-------------------------------- $82, 183. 17
Maintenance:
    Maintenance dredging in all pools as required___. $450, 000. 00
    Miscellaneous surveys, including cross-sections,
      discharge observations, and maintenance of
      gages------------------------------------         25, 000. 00
    Land and flowage easements------------- ------      18, 700.00
    Operating snag and dredgeboats--------------
                                    __2,                      000. 00
                                                       ------         495, 700. 00-

      Total-------------------------------------------                                   577, 883. 17
Balance remaining___     ---------------               --   ---------------               15, 732. 34

         Total----------                ------------------------------                   593, 615. 51
  Public Works funds.-The balance unexpended ($92,996.30), in-
cluding accounts receivable ($956.90), at the end of the year, plus an
allotment of $203,000, a total of $296,953.20 will be applied as
follows :
Accounts payable June 30, 1934 __________......                        $34, 736. 58,
Completion of work:
    Stand-by power units, July to September 1935-        $21, 100. 00
    Dredging between miles 247 and 282.6, July to Sep-
      tember 1935 ---------------------                _ 38, 116. 62
                                                                        59, 216. 62
New work:
    Dredging Dresden Island and Marseilles Pool ....       77, 000. 00
    Pattern shed, Government moorings, Brandon Road_        4, 000. 00
    Lockkeepers' dwellings, Lockport and Brandon
      Road ------------------               ------ ---    32, 000. 00
    Control house, Brandon Road------------------          18, 000. 00
    Dredging Utica to Lockport __________________ 50, 000. 00
    Capstans, all locks        ------------------         22, 000. 00
                                                                                         203.
                                                                                          vv,
                                                                                              (00
                                                                                              v   .
                                                                                                    00

        Total ----------------                                                           296, 953. 20
  The additional sum of $177,000 can be profitably expended dur-
ing the fiscal year 1936, as follows:
Maintenance dredging     -------------------------------------- $150, 000
Miscellaneous surveys, including cross sections, discharge observa-
tions and maintenance of gages_____________________________        25, 000
Operating snag and dredge boats     ----------------------------     2, 000
        Total        -----------------------------------------------                        177, 000
862         REPORT OF CHIEF OF ENGINEERS, U.                                     S.       ARMY,        19 34

                                    Cost and financial summary
                             MAINTENANCE          AND IMPROVEMENT               FUNDS


Cost of new work to June 30, 1934 _______                                                           $12, 052,514. 81
Cost of maintenance to June 30, 1934___                                                                  971, 526. 55

      Total cost of permanent work to June 30, 1934____                                                13, 024, 041. 36
Value of plant, materials, etc., on hand June 30, 1934_                                                    242,429. 75

      Net total cost to June 30, 1934___________________                                               13,266, 471.11
Plus accounts receivable June 30, 1934___                                                                  27, 103.00

      Gross total costs to June 30, 1934________________                                               13, 293, 574. 11
Minus accounts payable June 30, 1934_                                                                        123, 273. 86

     Net total expenditures_______                                                                     13, 170, 300. 25
Unexpended balance June 30, 1934__                                                                           897, 382. 73

        Total amount appropriated to June 30, 1934______                                               14, 067, 682.98

   Fiscal year ending June 30            1930              1931              1932               1933              1934


Cost of new work___                    $737. 164. 60 $2, 024, 841. 13 $2, 732, 426. 62 $3, 497, 697. 11         $495, 561. 90
C ost of m aintenance____           .........-             4, 021. 35      72, 787. 67     119, 295. 03          320, 589. 61

      Total cost..-------             737, 164. 60    2,028, 862. 48    2, 805, 214. 29    3, 616, 992. 14       816, 151. 51
Total expended------------            573, 940. 84    1, 959, 387. 17   2, 643, 624. 09    3, 698, 739. 78     1, 040, 425. 75

Allotted----...-----...----------     849, 500. 00   3, 390, 300. 00      349, 000. 00     4, 158, 158. 36       751, 074. 62


Balance unexpended July 1, 1933 _____________________________ $1, 186, 733.86
Amount allotted from War Department Appropria-
  tion Act approved Apr. 26, 1934________________  $686, 500. 00
Amount allotted from War Department Appropria-
   tion Act approved July 14, 1932__                  1, 503.40
Amount allotted from War Department Appropria-
  tion Act approved Mar. 4, 1933__                  496, 900. 38
                                                                 1, 184, 903. 78
      Amount to be accounted for___----                                                                 2, 371, 637.64
Deductions on account of revocation of:
   Impounded funds_                                                                 $18, 829. 16
   Allotment______ _______         _________                                        415, 000. 00
                                                                                                           433, 829. 16
       Net amount to be accounted for_ _____--    _______ ___                                           1, 937, 808.48
<Gross amount expended_________________________ $1, 333, 200. 67
Less:
     Reimbursements collected         $291, 128.01
    Receipts from sales--------------    1, 646. 91
                                                     292, 774. 92
                                                                                                        1,040, 425.75
      Balance unexpended June 30, 1934 _____________________                                              897, 382. 73
Outstanding liabilities June 30, 1934_____________ $130, 870. 83
Amount covered by uncompleted contracts---------      4, 908. 83
                                                                                                             135, 779. 66
      Balance available June 30, 1934_______________________                                                 761, 603. 07
Accounts receivable June 30, 1934 _____-----____-____-                                                        27, 103.00
      Unobligated balance available June 30, 1934____________                                                788, 706. 07
Amount (estimated) required to be appropriated for completion
of existing project'____________                                                                            102,090.     00
Amount that can be profitably expended in fiscal year ending
  June 30, 1936, for maintenance 1_________________________                                                  443, 000.00
   1Exclusive of available funds.
                  RIVERS AND HARBORS-CHICAGO,                                        ILL., DISTRICT                               863
                                               PUBLIO WORKS FUNDS

Cost of new work to June 30, 1934-------------------------                                                           $852, 687. 42
Cost of maintenance to June 30, 1934---                                                                              -----------
      Total cost of permanent work to June 30, 1934                                        -----------                    852, 687. 42
Value of plant, materials, etc., on hand June 30, 1934---------                                                           -- 1, 904. 04
      Net total cost to June 30, 1934__-_________-________       850, 783. 38
Plus accounts receivable June 30, 1934--------------------------      956.90

      Gross total costs to June 30, 1934_ .. _______________- 851, 740. 28
Minus accounts payable June 30, 1934------------------------34, 736. 58

     Net total expenditures     __----------------------                                               817, 003. 70
Unexpended balance June 30, 1934_- ----- __-- -                                              -_______--92, 996. 30
          Total amount appropriated to June 30, 1934 ___-__.______                                                        910, 000. 00

    Fiscal year ending June 30                 1930              1931               1932                1933                   1934


Cost of new work-----           ------------------------ -----------------------..-----                                      $852 687. 42
Cost of maintenance---------------------------------------                                                                       -
Total expended----..             -------------- --------------------------------                        ----   -----          817, 003. 70

Allotted ----------------------------------------                                                        -           --       910, 000. 00


Amount allotted from National Industrial Recovery Act ap-
  proved June 16, 1933    ------------------                                                                             $910, 000. 00
Gross amount expended--------------------      $823, 544. 28
Less reimbursements collected _________-
                                      -  --    -_ 6, 540. 58
                                                                                                                          817, 003. 70

      Balance unexpended June 30, 1934_ ..-.--------                                         ____-                         92, 996. 30
Outstanding liabilities June 30, 1934 ___________                                      $41, 519. 12
Amount covered by uncompleted contracts--- -----                                        28, 742. 65
                                                                                                                           70, 261. 77
     Balance available June 30, 1934_ ........---------                                        __                   --     22, 734. 53
Accounts receivable June 30, 1934 ----------------------                                                             -         956. 90

     Unobligated balance available June 30, 1934 _____ _____                                                               23, 691.43
Amount allotted by Public Works Administration, Emergency
Appropriation Act, fiscal year 1935_____________________                                                                 203, 000. 00
          Balance available for fiscal year 1935_-__----__- -                                       -                     226, 691. 43
             CONSOLIDATED COST AND FINANCIAL SUMMARY FOR ILLINOIS RIVER

Cost of new work to June 30, 1934 .........                                                                    $12, 905, 202. 23
Cost of maintenance to June 30, 1934--- ----                            _---------------                            971, 526. 55
      Total cost of permanent work to June 30, 1934-__----                                                      13, 876, 728. 78
Value of plant, materials, etc., on hand June 30, 1934                                     ----------               240, 525. 71
      Net total cost to June 30, 1934_ ... __..__     _______      14, 117, 2'54. 49
Plus accounts receivable June 30, 1934_      -__-_________________      28, 059. 90

     Gross total costs to June 30, 1934_______ --                                          _______     14, 145, 314. 39
Minus accounts payable June 30, 1934_    __-_____                                              -__________ 158, 010. 44

          Net total expenditures----------------.---                                                            13, 987, 303. 95
Unexpended balance June 30, 1934----------------                                                                -         990, 379. 03
          Total amount appropriated to June 30, 1934 -----                                                      14, 977, 682. 98
         91536- G 1934-55
864          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                          1934


   Fiscal year ending June 30                       1930             1931              1932              1933                   1934


                     ---
Cost of new work__----.   _                     $737, 164. 60 $2, 024, 841. 13 $2, 732, 426. 62 $3, 497, 697. 11        $1, 348, 249. 32
Cost of maintenance --------                   _-------------       4, 021. 35      72, 787. 67     119, 295. 03            320, 589. 61
      Total cost-----------------                737, 164. 60   2, 028, 862. 48   2,805, 214. 29    3, 616, 992. 14       1,668,
                                                                                                                               838.93.
Total expended.---------------                   573, 940. 84   1, 959, 387. 17   2, 643, 624. 09   3, 698, 739. 78       1, 857, 429. 45,
Allotted    .___   .....--------------------     849, 500. 00   3, 390, 300. 00     349, 000. 00    4, 158, 158. 36       1, 661, 074. 62.


Balance unexpended July 1, 1933______                  _______                                                  $1, 186, 733. 86
Amount allotted from War Department Appropria-
tion Act approved Apr. 26, 1934_______    __     $686, 500. 00
Amount allotted from War Department Appropria-
tion Act approved July 14, 1932__________           1, 503. 40
Amount allotted from War Department Appropria-
tion Act approved Mar. 4, 1933------        ___-496, 900. 38
Amount allotted. from National Industrial Re-
covery Act approved June 16, 1933----------     -910, 000. 00
                                                                                                                 2m,.094
                                                                                                                     vv ,
                                                                                                                         .903   78
                                                                                                                            .....


      Amount to be accounted for___________                                              -______          -      3, 281, 637. 64.
Deductions on account of revocation of-
    Impounded funds___-_______-- -       __--                                             $18, 829. 16
   Allotment- __-----                                                                     415, 000. 00
                                                                                                                      4Q        89Q      16
                                                                                                                       -i0 .,   ,   ..   .LV


      Net amount to be accounted for___----      -___-____                                                       2, 847, 808.48
Gross amount expended--------------------$2,        156, 744. 95
Less-
    Reimbursements collected-_,___ $297, 668. 59
    Receipts from sales---    ___- -- 1, 646. 91
                                                    299, 315. 50
                                                                                                                 1, 857, 429. 45-
      Balance unexpended June 30, 1934-__- -____________                                                              990, 379. 03
Outstanding liabilities June 30, 1934 ____________ -$172, 389. 95
Amount covered by uncompleted contracts ------          33, 651. 48
                                                                                                                      206, 041. 43
     Balance available June 30; 1934____                                                                              784, 337. 60;
Accounts receivable June 30, 1934______                                                                                28, 059. 901

    Unobligated balance available June 30, 1934___________                                                            812, 397. 50,
Amount allotted by Public Works Administration Emergency
Appropriation Act, fiscal year 1935_ ___--                                                                           203, 000. 00
           Balance available for fiscal year 1935                                                                 , 015, 397. 50
                                                                                                                 1____________
Amount (estimated) required to                                  be appropriated               for com-
pletion of existing project 1--                                  ------------                       _                102, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1936, for maintenance 1__________________                                                                   443, 000. 00
2. OPERATING AND CARE OF LOCKS AND DAMS, ILLINOIS RIVER, ILL..

  The improvement for which report is made under this caption
forms part of the project for improvement of the Illinois River, Ill.,
as modified by the River and Harbor Act approved July 3, 1930. For
general information regarding the improvement see pages 851 to 864
of this report. The completed locks and dams have been operated
   1 Exclusive of available funds.
          RIVERS AND HARBORS--CHICAGO,      ILL., DISTRICT       865
and maintained under the permanent indefinite appropriation as fol-
lows: La Grange since 1889 and Kampsville since 1893.
   In accordance with the act of Congress approved January 21, 1927,
modifying the project for improvement of Illinois River so as to
provide a 9-foot channel, the locks and dams at Copperas Creek and
Henry, formerly owned by the State of Illinois, were by deed dated
March 28, 1928, transferred to the United States, which took posses-
sion on July 1, 1928. These locks have been maintained under the
permanent indefinite appropriations since that date. The project as
modified included the removal of these two dams, and this work has
been completed.
    The act of July 3, 1930, provided for an extension of the project
so as to provide a navigable channel depth of not less than 9 feet
from Utica, Ill., to the heads of the present Federal projects on the
Chicago and Calumet Rivers. The locks on this section were placed
in operation on the following dates: Starved Rock, April 4, 1932;
Marseilles, May 22, 1932; Dresden Island, September 30, 1932; Bran-
don Road, January 13, 1932; and Lockport, October 5, 1932.
    Operations and results during fiscal year.-Maintenance and oper-
ating forces have been maintained throughout the year at La Grange
Lock and Dam, Kampsville Lock and Dam, Starved Rock Lock and
Dam, Marseilles Lock, Marseilles Dam, Dresden Island Lock and
Dam, Brandon Road Lock and Dam, Lockport Lock, and all appurte-
narit property and plant cared for.
    The total cost was $375,174.28, of which $11,674.50 was for La
Grange Lock, $59,208.85 for Kampsville Lock, $92.50 for Copperas
Creek Lock (Henry Lock, inactive) $49,891.34 for Starved Rock
Lock and Dam, $48,772.70 for Marseilles Lock, $15,527.23 for Mar-
seilles Dam, $37,615.68 for Dresden Island Lock and Dam, $3,020.75
for Goose Lake pump house, $45,329.10 for Brandon Road Lock and
Dam, $24,646.76 for the Government moorings, $56,369.04 for Lock-
port Lock, and $23,025.83 for special surveys. The expenditures
were $376.973.25.
    Condition at end of fiscal year.-A navigable channel now exists
connecting the Mississippi River at Grafton with Lake Michigan via!
the Illinois and Des Plaines Rivers, the Chicago Sanitary Canal, and
the Chicago River with a secondary outlet to Lake Michigan via
the Calumet-Sag Channel and the Calumet River. A navigable
depth of 9 feet is secured by a system of 7 locks and 6 dams. Two
of the dams, Kampsville and La Grange, are fixed and are in poor
condition because of advanced age, 41 and 45 years, respectively.
Recent repairs and improvements to the adjacent locks have placed
them in fair condition. Between Utica and Lockport, 4 movable
dams and 5 locks have been completed and are in good condition.
At Lockport water not used for lockage passes through the power
house and spillway owned by the Sanitary District of Chicago. The
project depth of 9 feet is everywhere available, except between Utica
and Starved Rock Lock, where maintenance dredging is in progress.
The controlling depth at this point is 8.5 feet.
    The total cost of operation and care has been $1,729,066.79, of
which $505,496.89 was for the La Grange Lock; $622,456.19 for
Kampsville Lock; $6,265.29 for Copperas Lock; $2,445.97 for Henry
866                REPORT OF CHIEF OF ENGINEERS,                        U. S. ARMY,              19 3 4

Lock; $95,383.08 for Starved Rock Lock; $74,958.98 for Marseilles
Lock; $22,987 for Marseilles Dam; $84,456.94 for Dresden Island
Lock; $3,020.75 for Goose Lake pump house; $135,588.49 for Bran-
don Road Lock; $24,646.76 for Government moorings; $122,827.32
for Lockport Lock; $27,248.75 for special surveys; and $1,284.38 for
installation of channel buoys.
   The total expenditures from the permanent indefinite appropria-
tion were $1,866,797.20.
    Proposed operations.-The locks and dams will be operated and
maintained under allotments                       from appropriations made                              available
for such purposes.
                                     Cost and financial summary

Cost of maintenance to June 30, 1934______------_------------    $1, 729, 066. 79
Value of plant, materials, etc., on hand June 30, 1934----------     165, 006. 86

      Net total cost to June 30, 1934__ _      __------------                                      1, 894, 073. 65
Plus accounts receivable June 30, 1934------------------------                                          2, 466. 20

      Gross total costs to June 30, 1934__                                                  -     1, 896, 539. 85
                                                                                                  1-----------
Minus accounts payable June 30, 1934_______---------                                                  29, 742. 65

      Net total expenditures ---------------------------      1, 866, 797. 20
Unexpended balance June 30, 1934__------------ --------------    100, 647.47

            Total amount appropriated to June 30, 1934 ___________                                 1, 967, 444. 67

            Fiscal year ending June 30            1930           1931           1932            1933           1934


Cost of new work...---------------------   ------------ -----------------------------------------------
Cost of maintenance----------------------- $22, 707. 81 $69, 990. 78 $299, 132. 00 $345,933. 05 $375, 174. 28
Total expended---------------------             23, 829. 66    56, 077.48    307, 112.02    484, 399. 01     376, 973. 25
Allotted------__     _-----------------------   10, 000. 00   125, 000. 00   331, 220. 00   745, 328. 61     119, 351. 26


Balance unexpended July 1, 1933_                                                                       $358,269. 46
Amount allotted from permanent indefinite appropriation, sec. 6,
River and Harbor Act, Mar. 3, 1909__----------------------                                            133, 000. 00

     Amount to be accounted for______________---____--_                                                491, 269. 46
Deductions on account of revocation of impounded funds                            --------              13, 648. 74

      Net amount to be accounted for ______________________                                            477, 620. 72
Gross amount expended----__----__-------------    $438, 809.99
Less reimbursements collected___     --------
                                     _____--        61, 836. 74
                                                                                                       376, 973. 25

      Balance unexpended June 30, 1934______________________                                           100, 647. 47
Outstanding liabilities June 30, 1934____________  $43, 659. 95
Amount covered by uncompleted contracts---------- 25, 065. 68
                                                                                                           68, 725. 63

     Balance available June 30, 1934 _______._______..______                                               31, 921. 84
Accounts receivable June 30, 1934__________________________                                                 2, 466. 20

     Unobligated balance available June 30, 1934_____________                                            34, 388. 04
Amount allotted for fiscal year 1935_ --------------         _                                          360, 000. 00
            Balance available for fiscal year 1935._--                                                  394, 388. 04
                            RIVERS AND HARBORS-CHICAGO,                                     ILL., DISTRICT                       867
       3. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                           (GENERAL)

   The cost of work during the year amounted to $55,225.34; expendi-
tures were $57,402.59. The balance unexpended June 30, 1934,
$52,729.75, will be applied as needed during the fiscal year 1935 to
payment of expenses to be incurred in connection with the above
items. The sum of $55,000 can be profitably expended during the
fiscal year ending June 30, 1936.
                                          Cost and financial summary

Cost of maintenance to June 30, 1934 _------........._____-__                                                         $273, 386. 98
Minus accounts payable June 30, 1934 --                                                                                     7________
                                                                                                                            773. 64

     Net total expenditures -- ___--                                ___--      ________-..             _              272, 613. 34
Unexpended balance June 30, 1934_                                                                                      52, 729.75
              Total amount appropriated to June 30, 1934--                                                - 325, 343. 09
                                                                                                -___-______

              Fiscal year ending June 30                       1930             1931            1932           1933            1934


Cost of new work.--------         ----------
Cost of maintenance ....-------------------                 $9, 231. 25      $87, 005. 02    $41, 493. 96   $80, 431. 41     $55, 225. 34
Total expended_                                     8, 184. 75
                               .-----------------------                       88, 031. 67     40, 457. 48    78, 536. 85      57, 402. 59
Allotted.................                                     29, 000. 00
                                       .......----------------------------   108, 172. 12      3, 000. 00    81, 430. 36     103, 740. 61


Balance unexpended July 1, 1933----------____                                                                              $6, 391. 73
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934_______________       _ $50, 000. 00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933______- ____________ 55, 000. 00
                                                                                                                       105, 000. 00
      Amount to be accounted for--------________      _                                                                111, 391. 73
Deductions on account of revocation of impounded funds--------                                                            , 259. 39
      Net amount to be accounted for________     -        -______110,
                                                                 1____132. 34
Gross amount expended___________________________ $69, 801. 82
Less reimbursements collected___________________   12, 399. 23
                                                                  57, 402. 59
      Balance unexpended June 30, 1934 _______..________                                                                   52, 729. 75
Outstanding liabilities June 30, 1934__________________________                                                             1, 319. 43
               Balance available June 30, 1934_________________________                                                    51, 410. 32

Amount that can be profitably expended in fiscal year ending
  June 30, 1936, for maintenance _____________________________                                                             55, 000. 00

                                       4. WAUKEGAN HARBOR, ILL.

   Locatio.-This harbor is on the west shore of Lake Michigan,
distant about 51 miles south of Milwaukee and about 38 miles north
from Chicago. (See U. S. Lake Survey Chart No. 74.)
   Previous projects.--An appropriation of $15,000 was made by the
River and Harbor Act of August 30, 1852, for a breakwater. This
work was abandoned. The original project was adopted June 14,
     1 Exclusive of available funds.
868       REPORT OF CHIEF OF ENGINEERS, U.               S. ARMY,    1934

1880, and modified August 2, 1882.          The cost and expenditures prior
to commencement of the existing project in 1903, and including ap-
propriation of $15,000 made by the River and Harbor Act of August
30, 1852, are $218,233.54 for new work, and $15,710.87 for mainte-
nance, a total of $233,944.41. (For further details see p. 1940 of
Annual Report for 1915.)
  Existing project.-This provides for-
    (a) A detached timber crib breakwater 600 feet long, and the construction of
a northerly and westerly extension to shore about 1,300 feet long.
    (b) Two parallel piers of timber cribs and piling, about 240 feet apart, 1,613
and 3,212 feet long for the north and south pier, respectively, the inshore end of
south pier being on a line diverging fromn the general line of the pier (Annual
Report for 1906, p. 1760).
    (c) A channel 200 feet wide, 18 feet deep, extending from Lake Michigan to
an inner basin of the same depth, protected on the east side by a pile revetment
:882 feet long; including a bulkhead estimated to cost $30,000, in front of the city
park, with additional dredging near the lake end of the north pier, and an
,enlarging of the inner basin.
    The project depth is referred to low-water datum for Lake ,Michi-
gan, which is taken at 578.5 feet above mean tide level at New York.
The fluctuations of water level are seasonal changes of about one-half
foot above or below the annual mean stage, and extreme fluctuations
of a temporary nature, due to wind and barometric pressure, of about
11/2 feet above or below the mean lake level prevailing at the time.
    The estimate of cost for new work, revised in 1930, is $614,300,
'exclusive of amounts expended on previous projects, but including
$30,000 (cost of bulkhead) to be contributed by local interests. The
latest (1930) approved estimate for annual cost of maintenance is
 $7,000, on the completion of the project.
    The existing project was authorized by the following river and
harbor acts: The act of June 14, 1880, provided for the parallel piers
and basin (Annual Report for 1880, p. 1942); the act of June 13,
1902, provided for the detached breakwater, for extending the piers,
and for the present channel dimensions (H. Doc. No. 343, 56th Cong.,
1st sess.) ; the act of July 3, 1930, provided for the extension of the
breakwater to shore, dredging near the outer end of the north pier,
and enlarging the inner basin (Rivers and Harbors Committee Doc.
No. 27, 71st Cong., 2d sess.). (For latest published map see the
last-mentioned document.)
   Local cooperation.-The River and Harbor Act approved July 3,
1930, provided that no work shall be done on enlarging the inner
basin until local interests have given assurances satisfactory to the
Secretary of War and the Chief of Engineers that they will assume
the cost of a bulkhead in front of the city park at an estimated cost
of $30,000. These assurances have not been given.
    Terminal facilities.-These consist of 2 coal wharves, 1 salt wharf,
1 package-freight and fishing wharf, owned by the city of Waukegan,
and the North Shore Coke & Chemical Co. has a wharf 1,000 feet
long, equipped with a coal-handling tower. These facilities are con-
sidered adequate for existing commerce.
    Operations and results during fiscal year.-The dredge Kewamunee
removed 29,000 cubic yards (scow measurement) of material from
entrance channel to restore project depth, at a cost of $4,934.06.
All work was done by hired labor and Government plant. The total
                 RIVERS AND HARBORS-CHICAGO,                                               ILL., DISTRICT                     869
cost was $4,934.06, all maintenance. Total expenditures were
$9,332.40.
    Condition at end of fiscal year.-The existing project is about 90
percent complete. The north pier and east.revetment were com-
pleted in 1904 and the south pier in 1909. The outer 600 feet of
breakwater was completed in 1904 and its shore-arm extension in
1931. All structures are in good condition. No soundings have
been taken since dredging in May 1934, but the minimum depth
in the channel and basin is believed to be 18 feet below low-water
datum. The mean water level in June 1934 was 0.53 foot below
datum. The work remaining to be done to complete the project
is dredging to enlarge the inner basin and dredging near the outer
-end of the entrance piers.
    The total cost was $1,279,623.29, of which $533,524.82 was for new
work and $746,098.47 for maintenance. Total expenditures were
$1,279,620.65.
    Proposed operations.-The balance unexpended will be applied
as follows:
Accounts payable June 30, 1934    .-------- - -__-_____-_______-_ $2. 64
Maintenance:
    Dredging entrance channel, with Government plant,
      spring of 1935----------------------------- $6,478.83
    Riprapping piers and breakwaters, by contract,
      fall of 1934-------------------------------_    5,000.00
                                                               11, 478. 83
             Total                                                        ...----- -------.-                             11, 481. 47
   Dredging is necessary to maintain the project depth in the en-
trance channel and inner basin. Additional riprap will be required
,along the breakwater and the entrance piers. The additional sum
,of $13,000 can be profitably expended for maintenance during the
fiscal year 1936, as follows:
Dredging entrance channel and basin, with Government plant,
  spring of 1936-----------------------------------------             $8, 000
Riprapping piers and breakwaters, by contract, fall of 1935----------- 5, 000

         Total-                     ------------------------------------------                                              1----
                                                                                                                             3, 000
                                                        lsmmary
                                       Cost and financial
Cost of new work to June 30, 1934-----------------       ---                                                        $751, 758.36
Cost of maintenance to June 30, 1934  ------------------------                                                       761, 809. 34
      Total cost of permanent work to June 30, 1934----------1, 513, 567. 70
Minus accounts payable June 30, 1934    -------------------------      2. 64
     Net total expenditures_-----------------------------,                                                           513, 565. 06
Unexpended balance June 30, 1934__---------------------------                                                         11, 481.47
          Total amrount appropriated to June 30, 1934                                                             , 525, 046. 53
                                                                                                                 1------------

         Fiscal year ending June 30                         1930               1931            1932          1933            1934


Cost of new work        ------------------------------      $33, 175.95 $190, 034. 48 _-                                      -
Cost of maintenance                           $90, 500. 67 90, 575.70
                                              $--------------             75, 040. 25 $71, 601. 26                          $4, 934. 06
       Total cost       ....       ....---------------------90, 500. 67     123, 751.65     265, 074. 73   71,601.26         4, 934.06
Total expended_. ----------------------                  82, 656. 97        99, 073. 68     306, 279. 80   58, 970. 32       9, 332, 40
Allotted- ----------------------                        110, 300. 00        306, 000. 00     39, 000. 00   41, 454. 00       6, 500. 00
870        REPORT      OF CHIEF OF ENGINEERS,              U.   S.   ARMY,   1934

Balance unexpended July 1, 1933____________                                    $14, 313. 87
Amount allotted from War Department Appropria-
tion Act approved Apr. 26. 1934____________-- $11, 000. 00
Amount allotted from War Department Appropria-
tion Act approved Mar. 4, 1933,----------       5, 000. 00
                                                                                16, 000. 00

     Amount to be accounted for---------------------------30                           313. 87
Deductions on account of revocation of allotment--------------                      9, 500. 00
      Net amount to be accounted for-----           -----------------           20, 813.87
Gross amount expended---    -------------------------------                      9, 332. 40

       Balance unexpended June 30, 1934------------------                       11, 481. 47
Outstranding liabilities June 30, 1934----------------------------                    2. 64
        Balance available June 30, 194--- ---------------------                 11, 478. 83
Amount (estimated) required to be appropriated for completion
of existing project 2         ______________                                   50, 700. 00
Amount that can be profitably expended in fiscal year ending
                                        -       -         -
June 30, 1936, for maintenance 1___                        _                   13, 000. 00

                              5.. CHICAGO HARBOR, ILL.

Location.-Northeastern Illinois, near the southern end of Lake
Michigan; 80 miles in a southerly direction from Milwaukee, Wis.
(See U. S. Lake Survey Chart No. 753.)
   Previous projects.-Adopted by River and Harbor Act of March
2, 1833, and modified by acts of June 23, 1866, March 2, 1867, July
1, 1868, and April 10, 1869. Work was continued under these
projects until 1870, the total cost and expenditures being $446,005,
the division between new work and maintenance not being available.
(For further details see p. 1941 of Annual Report for 1915.)
   Existing project.-This provides for the following work:
   (a) An inner breakwater, all of timber cribs, enclosing an inner basin of
about 224 acres in extent, the breakwater being in two sections, as follows:
The main inner breakwater 4,036 feet long with 300 feet of shore return on
north end; a southerly extension 2,550 feet long.
   (b) An exterior breakwater enclosing an outer basin of about 970 acres in
extent, the breakwater being in two sections, as follows: The main exterior
breakwater built of timber cribs and 5,413 feet long, and the southerly extension
built of rubble mound and concrete caissons and 5,000 feet long, exclusive of
the harbor entrance gap of 500 feet.
   (c) Maintenance dredging to a depth of 21 feet of that part of the inner
basin lying north of a line drawn eastwardly perpendicular to the eastern
boundary of Grant Park, from the northern end of said boundary, and also of
the entrance to Chicago River from the lake to Rush Street over a width
varying from 470 to 190 feet.
   The project depth is referred to low-water datum for Lake Michi-
gan, which is taken at 578.5 feet above mean tide level at New York.
   Seasonal fluctuations in mean stage from low water in winter to
high water in summer average about 1.2 feet. Local and temporary
fluctuations of 0.1 to 0.5 foot due to wind and difference in barometric
pressures occur daily. Seiches of 3 to 4 feet occur at infrequent
intervals.
  1   Exclusive of available funds.
  2   In addition $30,000 is to be contributed by local interests.
          RIVERS AND HARBORS-CHICAGO,        ILL., DISTRICT      871
   The estimate of cost for new work revised in 1914 was $3,686,500,
exclusive of amounts expended on previous projects. The latest
(1928) approved estimate of annual cost of maintenance is $50,000.
   The existing project was authorized by the following river and
harbor acts: The act of July 11, 1870, provided for the inner break-
waters and inner basin (H. Doc. No. 114, 41st Cong., 2d sess., and
Annual Report for 1879, pp. 1562-1567); the act of June 14, 1880,
provided for the exterior breakwater (Annual Report for 1879, pp.
1562-1567); the act of March 3, 1899, provided for the present depth
in the basin and entrance to Chicago River (Annual Report for
1897, pp. 2790-2791); the act of July 25, 1912, provided for the
shore-arm and southerly extension of the exterior breakwater (H.
Doc. No. 710, 62d Cong., 2d sess.) ; and the act of March 2, 1919,
modified the area to be dredged in the inner basin (H. Doc. No. 1303,
64th Cong. 1st sess.). The latest published map of this harbor is in
the Annual Report for 1914, opposite page 2924.
   Local cooperation.-Fully complied with.
   Termina; facilities.-The outer harbor terminals consist of 2
slips, 1 opening off from the main river and 1 opening off from
the inner basin; wharves, fronting on the river itself, and a mu-
nicipal pier extending into the outer basin from the lake front at the
outer end of Grand Avenue.
   The outer harbor facilities are not entirely adequate for existing
commerce.
   Operations and results during fiscal year.-Rebuilding the super-
structure of the inner breakwater with concrete by hired labor and
Government plant was continued and 2,271 feet completed. An addi-
tional 1,422 feet of old superstructure has been removed and 1,466
feet retimbered ready for concreting. A total of 11,067 cubic yards
of concrete was placed during the year. A total of 1,441 linear feet
of stone was placed. The cost was $164,564.63. Repairs were made
to the superstructure of the exterior breakwater by hired labor at a
cost of $8,781.38. A total of 7,998.41 tons of stone were placed along
the slopes of the rubble-mound breakwater by contract at a cost of
$21,923.71. Sale of plant amounted to a credit of minus $1,074.40.
The total cost was $194,195.32, all maintenance. Total expenditures
were $147,815.38, all from regular funds.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1923 at a saving of $276,658 under the estimated cost. The
entrance to Chicago River has been improved by the construction of
parallel entrance piers and dredging a channel 190 to 470 feet in
width to a depth of 21 feet below datum. The northerly arm of the
inner breakwater (timber, completed in 1874) is deteriorated and is
being rebuilt above the water line. The southerly arm (timber,
completed in 1880; concrete superstructure completed in 1930) is in
good condition. The exterior breakwater (timber, 5,413 feet, com-
pleted in 1889; concrete superstructure, completed in 1930) is in
good condition. The southerly extension (rubble mound, 2,270 feet,
completed in 1917) and the south arm (rubble mound, 1,500 feet,
completed in 1920; and concrete caisson, 1,188 feet with 42 feet of
rubble-mound connection, completed in 1923) have deteriorated to
872           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                      1934

some extent in the rubble-mound portions. Settlement and displace-
ment of stone has occurred in places along the underwater slopes and
a number of deck stones have disintegrated. Additional stone will
be required. The north pier (concrete superstructure, 975 feet, com-
pleted in 1908) is in good condition. The controlling depth is 20
feet, based upon soundings taken in May 1934, and referred to low-
water datum. The mean water level in June 1934 was 0.53 foot below
datum.
   The total cost was $5,037,110.57, of which $3,409,844.22 was for
new work and $1,627,266.35 for maintenance. Total expenditures
were $5,147,451.74.
  Proposed operations.--The balance unexpended, including accounts
receivable, will be applied as follows:
Accounts payable, June 30, 1934_ -------------------------          $14, 600. 58
Maintenance :
    Complete rebuilding about 1,200 feet of super-
      structure on inner breakwater with Govern-
      ment plant, summer of 1934----------------      $133, 689. 01
    Repairs to rubble-mound breakwater with rubble-
      stone by contract, summer of 1934------------- 34, 000. 00
    Dredging entrance channel, by contract, summer of
      1934     -------------------------------------    25, 000. 00
                                                                    192, 689. 01

          Total----------                               ---------------------------                                207,289. 59
  Repair of the rubble-mound breakwater and riprapping the ex-
terior breakwater will be required. The additional sum of $28,000
can be profitably expended for this purpose by contract during the
summer of 1935.
                                            Cost and financial summary
Cost of new work to June 30, 1934  ------------------------- $3, 855, 849. 22
Cost of maintenance to June 30, 1934-----------------------   1, 627, 266. 35

      Total cost of permanent work to June 30, 1934---------- 5, 483, 115. 57
Value of plant, materials, etc., on hand June 30, 1934----------  20, 036. 17

      Net total cost to June 30, 1934_ -----------                                                             5, 603, 151. 74
Plus accounts receivable June 30, 1934---------                                                                     4, 905. 58

      Gross total costs to June 30, 1934--------------------                                                   5, 608, 057. 32
Minus accounts payable June 30, 1934-------------------------                                                      14, 600. 58

     Net total expenditures-----------------------------   5, 593, 456. 74
Unexpended balance June 30, 1934--------------------------    202, 384. 01

           Total amount appropriated to June 30, 1934                                         __               5, 795, 840. 75

          Fiscal year ending June 30                          1930            1931          1932           1933           1934


Cost of new work.-----------------------
Cost of maintenance- __--_.---------------. $71, 515. 70 $257, 873. 83                   $28, 158. 89 $119, 565. 16    $194, 195. 32

Total expended-----................---------------......-- '96, 006. 11   239, 153. 81    20, 983. 04   122, 434. 19    147, 815. 38

Allotted -      ---.---------------------                 227, 700. 00     35, 000. 00     -820.   29   228, 721. 00    214, 268. 94
             RIVERS AND HARBORS-CHICAGO, ILL., DISTRICT                    873

Balance unexpended July 1, 1933__                                  $135, 930. 45
Amount allotted from War Department Appropria-
tion Act approved Apr. 26, 1934---------------    $177, 000. 00
Amount allotted from War Department Appropria-
tion Act approved July 14, 1932----------------     40, 100. 00
Amount allotted from War Department Appropria-
tion Act approved-
    Mar. 4, 1933----------------------------         98, 400. 00
    Feb. 23, 1931   ---                         __    2, 400. 00
                                                                    317, 900. 00
      Amount to be accounted for---------------------------         453, 830. 45
Deductions on account of revocation of-
   Impounded balance------------------------      $6, 247. 32
    Allotment----------------                     97, 383. 74
                                                                    103, 631. 06

      Net amount to be accounted for------------------------        350, 199. 39
Gross amount expended----------------------$221, 549. 73
Less-
    Reimbursements collected---------$42, 328. 86
    Receipts from sales--------------31, 405. 49
                                                  73, 734. 35
                                                                    147, 815. 38
      Balance unexpended June 30, 1934---------------------         202; 384. 01
Outstanding liabilities June 30, 1934-------------------------       42, 890. 07

      Balance available June 30, 1934--------------------           159, 493. 94
Accounts receivable June 30, 1934-----------------------------        4, 905.58

    Unobligated balance available June 30, 1934----------------    164, 399. 52

Amount that can be profitably expended in fiscal year ending
June 30, 1936, for maintenance 1------------___                    28, 000. 00
                             6. CHICAGO RIVER, ILL.

   Location.-Cook and Lake Counties, Ill., the navigable portions
being wholly in Cook County and the city of Chicago. (See U. S.
Lake Survey Chart No. 753.) For description see page 1467 of
Annual Report for 1932.
   Previous projects.-Adopted by the River and Harbor Act of
June 3, 1896, modified by acts of March 3, 1899, June 13, 1902, and
March 2, 1907, and superseded by act of March 2, 1919. The cost
and expenditures prior to adoption of the existing project (act of
Mar. 2, 1907) were $955,885.87 for new work and $109,462.55 for
maintenance, a total of $1,065,348.42. For further details see page
1942 of Annual Report for 1915.
   Existing project.-This provides for maintenance dredging to 21
feet below the hydraulic grade line, corresponding to low-water
datum in Lake Michigan, of the main river from Rush Street to
the junction of the North and South Branches (0.7 mile), the North
Branch from the junction to North Avenue (2.22 miles), the North
Branch Canal (1.04 miles), and the North Branch Turning Basin,
the channels and turning basin to be maintained to project depth to
within 20 feet of existing docks. The width of channel in main
river varies from 200 to 300 feet, in North Branch from 50 to 150
feet, and in the North Branch Canal from 70 to 110 feet.
1 Exclusive of available funds.
874     REPORT OF CHIEF OF ENGINEERS,                          U.   S.   ARMY,   1934

    All depths are referred to low-water datum for Lake Michigan,
with due allowance for hydraulic grade resulting from the drainage
canal, which reaches a maximum of 2 feet at Ashland Avenue.
    The estimate of cost for new work, made in 1899, was $810,600,
exclusive of amount expended on previous project. The latest
 (1928) approved estimate of annual cost of maintenance is $20,000.
    The existing project was authorized by the following river and
harbor acts: The act of March 3, 1899, provided for the present
channel depth; the act of March 2, 1907, was interpreted by the
Chief of Engineers on April 11, 1908, as adopting the new work of
the then existing project (H. Doc. No. 95, 56th Cong., 1st sess.);
and the act of March 2, 1919, which eliminated all work except
maintenance of those portions described (H. Doc. No. 1294, 64th
Cong., 1st sess.).  The latest published map is in the Annual Report
:for 1914, opposite page 2928.
    Local cooperation.-Compliedwith.
    Terminal facilities.-In the Chicago River and its branches there
is a total wharfage, including numerous slips, of about 150,000 feet,
about 15,000 feet of which is used by private interests for shipping
purposes. These terminals are owned and operated by steamboat
lines, grain, coal, and lumber companies, and various other indus-
tries. They are more than adequate in extent for existing com-
merce. There are no public docks, wharves, or other terminal
facilities on the main river or its branches.
  Operations and results during fiscal year.-A total of 50,150 cubic
yards of material was removed by contract from the North Branch
Canal at a cost of $14,655.55. Miscellaneous surveys were made at
a cost of $326.85. The total cost was $14,982.40, all maintenance.
Total expenditures were $14,998.97.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1914 at a saving of $265,921 under the estimated cost. The
controlling depth in the river and in the North Branch is 20% feet
up to Division Street and thence 19 feet to the North Branch Turn-
ing Basin. The controlling depth in the North Branch Canal is 18
feet. Depths in the Turning Basin vary from about 20 feet in the
center to 16 feet in the west portion, and 181/2 feet in the east por-
tion. Depths are based upon soundings taken in March 1934 and
are referred to low-water datum. The mean water level in June
1933 was 0.53 foot below datum. The heads of navigation for com-
mercial vessels are Belmont Avenue on the North Branch and Ash-
land Avenue on the South Branch, 5.85 and 6.63 miles, respectively,
from the Michigan Avenue Bridge.
   The total cost was $1,212,470.83, of which $544,678.70 was for new
work and $667,792.13 for maintenance. Total expenditures were
$1,212,437.96.
   Proposed operations.-The balance unexpended will be applied as
follows :
Accounts payable June 30, 1934-----------------------------------     $32. 87
Maintenance: Dredging, by contract, summer of 1934_-------------- 84, 000. 77

      Total ---------    -----------------------------------                        84, 033. 64
  Dredging to maintain project depth in the river will be necessary.
The additional sum of $56,000 can be profitably expended for this
purpose, by contract, during the summer of 1935.
              RIVERS AND HARBORS-CHICAGO,                                    ILL.,      DISTRICT                   875
                                Cost and financial summary
Cost of new work to June 30, 1934_______________                                                    $1,500, 564. 57
Cost. of maintenance to June 30, 1934_____________________                                             777, 254. 68

     Total cost of permanent work to June 30, 1934------ 2, 277, 819.25
Minus accounts payable June 30, 1934__ _____________________-32. 87

     Net total expenditures____________________________                                              2, 277,786.38
Unexpended balance June 30, 1934__________________________                                               84, 033. 64

        Total amount appropriated to June 30, 1934--                                    -__          2, 361, 820. 02

        Fiscal year ending June 30                 1930          1931            1932             1933           1934

Cost of new work....----------------  I           ------------
Cost of maintenance ----------------- $167, 845. 64 $93, 257. 15                 $462. 70         $227.48      $14, 982.40
Totalexpended.........                          169, 540. 28
                               ..----------------------        89, 463. 41      4, 258. 92         178. 04      14, 998. 97
Allotted--     -----------------------        200, 100. 00     76, 400. 00 -10, 889. 02       ------------      92, 954. 44


Balance unexpended July 1, 1933____________                                                                  $6, 078.17
Amount allotted from War Department Appropria-
  tion Act approved Apr. 26, 1934______________ $13, 000.00
Amount allotted from War Department Appropria-
  tion Act approved Mar. 4, 1933-----_ __----__  80, 000. 00
                                                                                                             93, 000. 0

      Amount to be accounted for_---------------------------                                                 99, 078. 17
Deduc°tions on account of revocation of impounded funds ----                                                      45. 56

      Net amount to be accounted for------------------------                                                 99, 032. 61
Gross amount expended-----------------------------------                                                     14, 998.97

       Balance unexpended June 30, 1934 ________________----84,                                                 033.64
Outst anding liabilities June 30, 1934_____________________ -                                                    91. 63

        Balance available June 30, 1934------------------------                                              83, 942. 01

Amount that can be profitably expended in fiscal year ending
June 30, 1936, for maintenance 1                                                                            56, 000. 04

              7. CALUMET HARBOR AND RIVER, ILL. AND IND.

  Location.-Northeastern Illinois (Cook County), near the south-
ern end of Lake Michigan, 121/2 miles south of Chicago Harbor, and
known on the Great Lakes as " South Chicago Harbor ", it being
within the corporate limits of the city of Chicago. A part of the
breakwater and qf the anchorage behind the same are in Indiana.
(See U. S. Lake Survey Chart No. 754.) For description see page
1471 of Annual Report for 1932.
  Previous projects.-The original project for Calumet Harbor was
adopted by River and Harbor Act of July 11, 1870, and modified
August 11, 1888. Work was continued under these projects until
1896, the total cost and expenditures being $454,484.53.
  The original project for Calumet River was adopted by River and
Harbor Act of July 5, 1884, and modified August 5, 1886. The cost
and expenditures under this original and modified project were
$446,718.98, of which $401,488.50 was for new work and $45,230.48
  1 Exclusive of available funds.
,876       REPORT     OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

for maintenance. (For further details see p. 1943 of Annual Report
for 1915.)
   Existing project.-This provides for the following work:
   (a) A breakwater (timber crib) 4,400 feet long, running from the shore due
east, together with an extension of the same 2,500 feet long in a southeasterly
direction.
    (b) Deepening of anchorage area (about 366 acres in extent) sheltered by
breakwater to 21-foot depth.'
    (c) Extension of south pier (timber crib) 800 feet.
    (d) Deepening Calumet River entrance to 21-foot depth 1 from the lake to
the Elgin, Joliet & Eastern Railway Co. bridge near the old shore line, the
channel to be 200 feet wide at the surface and 160 feet wide at the bottom at
the inner end, and widened at the outer end.
   (e) A channel 200 feet in width, with 20-foot navigable 2 depth from the
mouth of the river at the Elgin, Joliet & Eastern Railway bridge, near the old
shore line of Lake Michigan, to The Forks (5.47 miles), with five turning basins
located at intervals between these points. The turning basins above the one
nearest the mouth to be of such shape and dimensions as will enable a vessel
650 feet in length to turn with ease and the turning basin at The Forks to
have a water-surface diameter of 750 feet.
    The estimate of cost for new work, revised in 1928, is $2,140,000,
exclusive of amounts expended on previous projects. The latest
 (1928) approved estimate of annual cost of maintenance is $70,000.
    The existing project was adopted by the River and Harbor Act of
March 3, 1899 (Annual Report for 1896, pp. 2584, et seq., and H. Doc.
No. 277, 54th Cong., 1st sess.), and amended by the Secretary of
War on July 11, 1902, under authority of the River and Harbor Act
of June 13, 1902.
    The act of March 3, 1905, provided for the present channel dimen-
sions between the mouth of the river and One Hundred and Twenty-
second Street, 4.2 miles, and for the five turning basins (H. Doc.
No. 172, 58th Cong., 2d sess.); the act of June 25, 1910, provided for
the present dimensions of the channel between One Hundred and
Twenty-second Street and The Forks, and of the turning basin ad-
joining the upper limit of the project at The Forks (H. Doc. No.
349, 60th Cong., 1st sess.).
   The widening of the outer end of the entrance channel was author-
ized by the River and Harbor Act of March 2, 1919 (H. Doc. No.
237, 63d Cong., 1st sess.).
   The act of September 22, 1922, consolidated the two projects for
Calumet Harbor and Calumet River to form a single project for Cal-
umet Harbor and Calumet River, Ill. and Ind. The latest published
maps appear opposite pages 2930 and 2932, Annual Report for 1914,
and in House Document No. 494, Seventy-second Congress, second
session.
   Supplementing the work authorized by Congress the construction
of about 5,000 feet of breakwater and dredging the outer harbor, as
recommended by the Chief of Engineers in House Document No.
494, Seventy-second Congress, second session, was included in the
Public Works program under the National Industrial Recovery Act.
   Recormmended modifications of project.-Under date of November
7, 1932, the Chief of Engineers recommended that the project for
  1 Low-water datum for Lake Michigan (see report Chicago Harbor), to which all depths
at this harbor are referred.
  2 In order to give a navigable depth of 20 feet the estimates provide for dredging to a
depth of 21 feet (low-water datum for Lake Michigan) below One Hundred and Twenty-
second Street and 21.5 feet above that point.
          RIVERS AND HARBORS-CHICAGO,        ILL.,   DISTRICT     877
Calumet Harbor and River be modified so as to provide, including
the work already accomplished, for: (a) An outer harbor protected
by two breakwaters, one extending from the shore due east 4,400
feet, thence southeasterly 2,500 feet, and the other a detached break-
water extending about 5,000 feet southeasterly with an entrance 600
feet wide between the breakwaters; (b) dredging the outer harbor
area to a depth of 26 feet with a minimum width of 3,000 feet; (c) an
entrance channel to the river 26 feet deep between existing bulkheads
to the Elgin, Joliet & Eastern Railway Co. bridge near the orig-
inal shore line; (d) a channel in Calumet River, thence to The
Forks, with a minimum width of 200 feet and with a depth of
25 feet to the Semet Solvay wharf, near One Hundred and Eleventh
Street; a depth of 23 feet through the rock section in the vicinity of
One Hundred and Eleventh and One Hundred and Fourteenth
Streets, thence a depth of 21 feet to One Hundred and Twenty-second
Street, and thence a depth of 21.5 feet to the head of the improve-
ment; (e) widening and straightening the river channel, except
through the rock cut, to lines 20 feet from the bulkhead lines now
or hereafter established; (f) five turning basins at intervals along
the channel, of suitable size for turning the largest lake cargo car-
riers, and each of the same depth as the adjacent channel; all at an
estimated cost of $4,540,000 in addition to the amounts heretofore
.authorized, with maintenance estimated at $125,000 per annum, which
is $55,000 in excess of the estimated amount now required; provided,
that the widening of the channel at any locality or the future excava-
tion of a turning basin shall not be commenced until certain condi-
tions of local cooperation have been complied with (H. Doc. No. 494,
72d Cong., 2d sess.). The breakwater construction and dredging a
portion of the outer harbor were included in the Public Works
program.
   Local cooperation.-The act of March 3, 1905, required as a condi-
tion precedent to Federal expenditure upon any one of the five turn-
.ig basins the donation to the United States of the land necessary for
that turning basin. As a result, the land needed for Turning Basins
Nos. 1, 3, and 5 has been conveyed to the United States. The total
.area thus conveyed is 17.85 acres, and the value of the land at the
time of its conveyance was approximately $35,700.
   Terminal facilities.-Extensive terminals have been constructed by
private interests which are adequate for present commerce.
             OPERATIONS AND RESULTS DURING FISCAL YEAR

   Regular funds.-None.
   Public Works funds.-A total of 328,448 cubic yards of material
was dredged from the outer harbor by contract at a cost of $149,-
931.77. The work is about 9.6 percent completed. Work was dis-
continued on June 2, 1934, due to labor disturbances. The construc-
tion of 5,020 feet of steel sheet pile cellular-type breakwater was
started May 28, 1934, and two cells driven. This work was also dis-
continued on June 2, 1934, due to labor disturbances. The cells were
later wrecked by wave action. No portion of the breakwater is com-
pleted. The steel sheet piling for the breakwater was purchased by
the United States. The cost was $310,232.08. The total cost was
 $460,163.85, all for new work. Total expenditures were $393,088.18.
878     REPORT    OF CHIEF OF ENGINEERS,         U.   S. ARMY,       1934

                     CONDITION AT END OF FISCAL YEAR

   Regular funds.-The existing project is 96 percent completed.
The breakwater (completed in 1904; concrete superstructure com-
pleted in 1924) is in good condition. Under permit from the Secre-
tary of War, the Youngstown Sheet & Tube Co. and its predecessors
have removed all the south pier (completed in 1897) and rebuilt the
frontage with a concrete dock wall 2,961 feet in length. The con-
trolling depth in the entrance channel is about 21 feet. The con-
trolling depth in the river is about 191/2 feet up to the plant of the
General Chemical Co., about 4.2 miles above the Elgin, Joliet &
Eastern Railway bridge, thence about 18         feet to Turning Basin
No. 5, at the upper end of the project. Depths in Turning Basin
No. 5 vary from 17 to 21 feet, averaging about 20 feet. Depths are
based on soundings taken in April and June 1934. The mean water
level in June 1934 was 0.53 foot below datum. The head of naviga-
tion for commercial vessels is at The Forks, the present limit of
Government improvement. The work remaining to be done to com-
plete the project is the construction of Turning Basins Nos. 2 and 4.
This work awaits the cession of the necessary land, free of cost, to the
United States.
   The total costs and expenditures were $3,698,349.11, of which
$1,947,308.07 was for new work, and $1,751,041.04 for maintenance.
   Public Works funds.-Dredging in the outer harbor has produced
the project depth of 26 feet over an area about 2,800 by 395 feet.
The work is about 9.6 percent completed. Depths in the portion to be
dredged vary from 13 to 27.5 feet. The two steel sheet pile cells
driven by the contractor for the construction of the breakwater were
wrecked by wave action on June 6, 1934. The removal of the wreck-
age is awaiting settlement of the tugmen's strike.
   The total cost was $460,163.85, all for new work. Total expendi-
tures were $393,088.18.
   The grand total cost, all funds, was $4,158,512.96, of which $2,407,-
471.92 was for new work and $1,751,041.04 for maintenance. The
grand total expenditures were $4,091,437.29.
   Proposed operations.-The balance unexpended will be applied to
maintenance; dredging by contract during the spring of 1935.
   The unexpended balance of National Industrial Recovery Act
funds will be applied as follows:
Accounts payable June 30, 1934     _---      _______
                                  -----------------          _          $67, 576. 33
New work :
    Completing the construction of a breakwater,
      approximately 5,020 feet long under exist-
      ing contract, about Nov. 1, 1935---------- $1,378, 000. 00
    Completing dredging outer harbor, section no.
      1, under existing contract, about Nov. 1,
      1935 ---------------------------------          455,000. 00
    Completing dredging outer harbor and en-
      trance channel, section no. 2, under exist-
     ing contract, about Nov. 1, 1935-----------      765, 037. 96
                                                                     2, 598, 037. 96
        Total----------------------------------------------           2, 665, 614. 29
  That portion of the outer basin which will be protected by the
breakwater now under construction should be dredged so as to extend
the area of the harbor of refuge, and the roclk section of the river,
                     RIVERS      AND HARBORS-CHICAGO,                                   ILL.,      DISTRICT                       879
which is now a menace to navigation, should be deepened to permit
vessels to load to full draft. Dredging to maintain project depth in
the river above the rock section will also be necessary. Additional
riprap is required to protect the old breakwater, and minor repairs
to the piers and breakwater will be necessary.
   The additional sum of $1,362,500 can be profitably expended during
the fiscal year 1936, as follows:
New work:
   Dredging in outer harbor where protected by new break-
     water, by contract   -------------------------------- $1, 094, 000. 00
   Deepening rock section of Calumet River, by contract------- 200, COO. 00

                                                                                                                    1, 294, 000. 00

Maintenance:
    Dredging by contract, summer of 1935 --- __---          -____ -___ -                                                   54, 500. 00
    Riprapping breakwater by contract, summer of 1935---------                                                             11, 000. 00
    Repairs to piers and breakwater by contract or with Gov-
      ernment plant during the fiscal year__ __-__---___---                                                                  3, 000.00

                                                                                                                           68, 500. 00
                                           Cost and finanoal summary
                                MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934___________---____ -__                                                           $2, 803, 281. 10
Cost of maintenance to June 30, 1934_____________________---                                                       1, 796, 271. 52
            Total cost of permanent work to June 30, 1934-----------                                                4, 599, 552. 62

Net total expenditures---- -----------------------------------                                                      4, 599, 552. 62
Unexpended balance June 30, 1934 __---                                                                                     30, 209.07

            Total amount appropriated to June 30, 1934______________                                                4, 629, 761. 69

            Fiscal year ending June 30                       1930           1931            1932                1933            1934


Cost of new work---..-------         -                     -            ---------------------
Cost of maintenance----------------------                 $2, 343. 55 $396, 478. 98 $12, 874. 14 $62, 276. 63 ------------
Total expended_. --------------------                       4, 663. 30   383, 075. 12     26, 651.66         62, 276. 63--
Allotted ..........------     ......--------------... .   --1, 000. 00   413, 000. 00 -18, 753. 73           45, 514. 77       19, 300. 00


Balance unexpended July 1, 1933-------------------------------                                                          $10, 909. 07
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934_ .. __.....-____--__         $29, 300. 00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933 --            _____----_--55,      000.00
                                                                                                                           84, 300. 00

     Amount to be accounted for_----------------------------                                                               95, 209. 07
Deductions on account of revocation of allotment ---------                                                                 65, 000. 00

      Net amount to be accounted for-.... _________   ___                                                                  30, 209. 07
Balance unexpended June 30, 1934----------------------------                                                               30, 209. 07

Amount (estimated) required to be appropriated for completion
   of existing project 1____________                                                                   ---             192, 700. 00

Amount that can be profitably expended in fiscal year ending
    June 30, 1936, for maintenance 1___________                                                                            68, 500. 00
   1   Exclusive of available funds.
           91536-ENG 1934                  56
880            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                              1934

                                             PUBLIC WORKS FUNDS

Cost of new work to June 30, 1934- .________________-----              $460, 163. 85
Cost of maintenance to June 30, 1934_____________                                                       ----------
      Total cost of permanent work to June 30, 1934------------460, 163. 85
Value of plant, materials, etc., on hand June 30, 1934------------___         498. 19
      Net total cost to June 30, 1934______________________              460, 662. 04
Plus accounts receivable June 30, 1934______________________                    2. 47
      Gross total costs to June 30, 1934_ .......    __--_____-_         460, 664. 51
Minus accounts payable June 30, 1934__________________________            67, 576. 33
      Net total expenditures_______-----___________                      393, 088. 18
Unexpended balance June 30, 1934_-           -----
                                                __--______________    2, 665, 611. 82
      Total amount appropriated to June 30, 1934_____________ 3, 058, 700. 00

       Fiscal year ending June 30                 1930           1931         1932             1933             1934


Cost of new work_ _-__--------.-----------
                                .-----------------                                                           $460, 163. 85
Cost of maintenance------------------------------
Total expended---          -----------------------          ------                                            393, 088. 18

Allotted   -     -    ----------------   -    ------------ ----------------- ---------------      ---       3, 058, 700. 00


Amount allotted from National Industrial Recovery Act, ap-
  proved June 16, 1933--------------------------------- $3, 058, 700.                                                  00
Gross amount expended -------------------------     $393, 485. 61
Less-
    Reimbursements collected----------$396. 20
    Receipts from sales-----------------      1. 23
                                                          397. 43
                                                                     393, 088.                                         18
      Balance unexpended June 30, 1934-------------------         2, 665, 611.                                         82
Outstanding liabilities June 30, 1934------------- $331, 133.92
Amount covered by uncompleted contracts ------- 2,343, 282. 40
                                                                  2, 674, 416.                                         32
     Balance available June 30, 1934 __________ -_____-_                                                  -8, 804. 50
Accounts receivable June 30, 1934_--_ -----   -------------                                                     2. 47
     Unobligated balance available June 30, 1934----        - -                                           -- 8, 802. 03

                                                    - - --completion
                                          - - - - -for
Amount (estimated) required to be appropriated
of Public Works Administration project
                                                           - - - - - - - - - 3, 274, 000. 00

Amount that can be profitably - expended     in fiscal year ending
                                 -- - -- - -- - -- - -- - -- - -- - -- -- - -
June 30, 1936, for new work                                                  1, 294, 000. 00
CONSOLIDATED         COST ANDI FINANCIAL SUMMARY FOR                      CALUMET        HARBOR           AND    RIVER,
                                       ILL. AND IND.

Cost of new work to June 30, 1934--------------------------- $3, 263, 444.                                             95
Cost of maintenance to June 30, 1934__________________________ 1, 796, 271.                                            52
      Total cost of permanent work to June 30, 1934-----------5, 059, 716.                                             47
Value of plant, materials, etc., on hand June 30, 1934-----------           498.                                       19
       Net total cost to June 30, 1934_____________          ______ 5, 060, 214.                                       66
Plus accounts receivable June 30, 1934 _______________________                2.                                       47
       Gross total costs to June 30, 1934__________________         5, 060, 217.                                       13
Minus accounts payable June 30, 1934       _____________________        67, 576.                                       33
       Net total expenditures-----------------------------          4, 992, 640.                                       80
Unexpended balance June 30, 1934.---------          -------         2, 695, 820.                                       89
       Total amount appropriated to June 30,. 1934-         _       7, 688, 461.                                       69

  1 Exclusive of available funds.
                   RIVERS AND HARBORS-CHICAGO,                                           ILL., DISTRICT                        881

   Fiscal year ending June 30                         1930            1931               1932            1933               1934


Cost of new work_                                ---------                                                                $460, 163. 85
Cost of maintenance ------------                     $2, 343. 55   $396, 478. 98      $12, 874. 14     $62, 276. 63    --------------
       Total cost--------------...
                         .....               -        2, 343.55     396, 478. 98        12, 874. 14     62, 276. 63        460, 163.85
Total expended----_                  _                4, 663. 30    383, 075. 12        26, 651. 66     62, 276. 63        393, 088. 18

Allotted------------------------                   -- 1, 000. 00    413, 000. 00      -18, 753. 73      45, 514. 77      3,078,000.00


Balance unexpended July 1, 1933-------------------------------                                                         $10, 909. 07
Amount allotted from War Department Appropria-
  tion Act approved Apr. 26, 1934 ____              $29, 300. 00
Amount allotted from War Department Appropria-
  tion Act approved Mar. 4, 1933------------------   55, 000. 00
Amount allotted from National Industrial Recovery
  Act approved June 16, 1933-------------------- 3, 058, 700. 00
                                                                                                                 3,143, 000. 00

      Amount to be accounted for----------------------------3,                                                         153, 909. 07
Deductions on account of revocation of allotment--                                                                      65, 000. 00

      Net amount to be accounted for_--                                                                          3, 088, 909. 07
Gross amount expended___                                                                        $393, 485. 61
Less-
     Reimbursements collected------------- $396. 20
    Receipts from sales-------------------     1. 23
                                                                                                      397. 43
                                                                                                                       393, 088. 18
      Balance unexpended June 30, 1934----------------------     2, 695,820. 89
Outstanding liabilities June 30, 1934  __          $331, 133. 92
Amount covered by uncompleted contracts--------- 2, 343, 282. 40
                                                                 2, 674, 416. 32

      Balance available June 30. 1934---------------------__                                                             21, 404. 57
Accounts receivable June 30, 1934------------------------------                                                                2. 47

           Unobligated balance available June 30, 1934 --------------                                                   21, 407. 04
Amount (estimated) required to be appropriated for completion
of the improvement 1----------------------------------------__ 3, 466, 700. 00
Amount that can be profitably expended in fiscal year ending June
30. 1936-
                           - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
    For new work 1_                                                                                                   , 294, 000. 00
                                         1
        For maintenance                                                            -------                  __           68, 500. 00

           Total 1______                                                                                              362, 500. 00
                                                                                                                  1-----------1,

                                                 8. INDIANA HARBOR, IND.

  Location.-Northwestern Indiana (Lake County), on southwest
shore of Lake Michigan, 18 miles southeast of Chicago Harbor. (See
U. S. Lake Survey Chart No. 754.)
  Previous project.-Adopted by River and Harbor Act of June 25,
1910. Cost and expenditures: For new work, $60,667.41; for main-
tenance, $2,509.54; total, $63,176.95. For further details see page
1943 of Annual Report for 1915.
   1   Exclusive of available funds.
882     REPORT OF    CHIEF OF ENGINEERS,       U.   S.   ARMY,   1934


  Existing project.-This provides for-
   (a) A northerly rubble-mound breakwater 2,520 feet long and an easterly
reinforced concrete-caisson breakwater 3,402 feet long, the construction and
placing of a lighthouse crib, and dredging the breakwater entrance.
   (b) An outer harbor channel increasing in depth from 23 feet at the inner
end to 26 feet at the north entrance.
   (c) An inner harbor channel 22 feet deep and 160 feet wide from the outer
harbor to White Oak Avenue on the Lake George Branch and to the north
line of One Hundred and Forty-first Street on the Calumet River Branch, and
the maintenance of a channel 20 feet deep and 80 feet wide in the remainder
of that branch, except the removal of sewage deposits and other city refuse,
after completion and acceptance from private parties.
   (d) The construction of a turning basin at the forks, 22 feet deep.
   The United States has accepted as completed and assumed the
maintenance of 7,400 feet of the main inner channel, all of the ex-
tension toward Lake George, and 550 feet of the Calumet River
Branch south of the turning basin at the forks. That part of the
channel from the end of the 550-foot section mentioned above to the
Grand Calumet River has not as yet been completed by local interests
or accepted for maintenance by the United States.
   The project depths are referred to low-water datum for Lake
Michigan, which is taken at 578.5 feet above mean tide level at
New York.
   Seasonal fluctuations in mean stage from low water in winter to
high water in summer average about 1.2 feet. Local and temporary
fluctuations of 0.1 to 0.5 foot, due to wind and difference in baro-
metric pressures, occur daily. Seiches of 3 to 4 feet occur at infre-
quent intervals.
   The estimate of cost for new work, revised in 1930, is $2,088,480, ex-
clusive of amount expended on previous project. The latest (1930)
approved estimate for annual cost of maintenance is $70,000 until
the unprotected banks of the canal have become stabilized, and
$40,000 thereafter.
   The existing project was authorized by the following river and
harbor acts: The act of June 25, 1910, provided for the outer harbor
and the maintenance of the inner harbor channel (H. Doc. No. 1113,
60th Cong., 2d sess.); the act of March 4, 1913, originally provided
for the breakwaters (H. Doc. No. 690, 62d Congress., 2d sess.); the
act of March 2, 1919, provided for the lighthouse crib, dredging the
breakwater entrance, and for the present length and alinement of
breakwaters (Rivers and Harbors Committee Doc. No. 6, 65th Cong.,
2d sess.) ; the act of March 20, 1922, modified the length of channel to
be maintained in extension to Lake George (Public, No. 176, 67th
Cong.), and the act of July 3, 1930, provided for the present channel
dimensions and for the turning basin at the forks (Rivers and
Harbors Committee Doc. No. 21, 71st Cong., 2d sess.). The latest
published maps are in the last-mentioned document.
   The River and Harbor Act of March 3, 1925, authorized the Secre-
tary of War to modify the project so far as relates to length and
alinement of breakwaters and to sell to the Youngstown Sheet & Tube
Co. approximately 1,180 linear feet of the shoreward end of the
existing north breakwater for the sum of $90,000, and apply this
sum to the extension of the east breakwater. The sale was consum-
mated and the amount credited to the appropriation September 20,
1925.
          RIVERS AND HARBORS-CHICAGO,         ILL., DISTRICT       883
   The act of June 30, 1932 (Public, No. 219, 72d Cong.), authorized
the Secretary of War to sell to the Inland Steel Co. approximately
1,903 feet of the southerly end of the existing east breakwater, sub-
ject to such conditions and limitations as he may impose to insure
proper maintenance of the breakwater and to protect the interests
of navigation, for the sum of $114,180, and pay the proceeds into
the United States Treasury. The sale was consummated and quit-
claim deed was given the Inland Steel Co. on December 27, 1933.
    Supplementing the work authorized by Congress, the extension of
the outer breakwater about 2,300 feet, and dredging the outer harbor
and entrance channel as recommended by the Chief of Engineers in
Rivers and Harbors Committee Document No. 29, Seventy-second
Congress, first session, has been included in the Public Works pro-
gram under the National Industrial Recovery Act.
    Recommended modifications of project.-Under date of May 20,
1932, the Chief of Engineers recommended the further improve-
ment of Indiana Harbor and Canal, Ind., so as to provide for ex-
tending the outer breakwater about 2,300 feet to the north; for an
entrance channel generally 800 feet wide with depth of 28 feet at the
outer end and 26 feet at the inner end; for dredging the anchorage
and maneuver basin in the outer harbor to a depth of 26 feet and the
channel between the bulkheaded fills in the outer harbor to a depth
of 25 feet; for widening the main stem of the Indiana Harbor Canal
to a bottom width of 260 feet with a depth of 22 feet from the outer
harbor to the Forks; and for dredging the Calumet Branch from
the forks to One Hundred and Forty-first Street to the same width
and depth, all at an estimated cost of $1,820,000, with $53,000 an-
nually for maintenance, subject to certain conditions of local coopera-
tion (Rivers and Harbors Committee Doc. No. 29, 72d Cong., 1st
sess.). Included in the Public Works program.
    Local cooperation.-Complied with.
    Terminal facilities.-There is now in existence about 26,700 feet of
wharfage along the main channel and the extension toward Lake
George. Of this amount about 5,100 feet along the outer harbor
and the inner harbor channel is being used by steel, oil, and con-
struction companies. The wharves now in use are fully equipped
and are considered adequate for existing commerce.
             OPERATIONS AND RESULTS DURING FISCAL YEAR

   Regular funds.-None.
  Public Works funds.-The contractor started work April 26, 1934,
on the construction of 2,320 feet of rubble-mound breakwater. About
950 feet of core A stone and 300 feet of covering B stone has been
placed. The work is 18 percent completed. The total cost was
$160,553.17 for new work. The total expenditures were $122,860.77.
   The total cost, all funds, was $160,553.17, all new work. The total
expenditures were $122,860.77.
                   CONDITION AT END OF FISCAL YEAR

  Regular fuwds.-The existing project is about 90 percent com-
pleted. The north breakwater (rubble mound, 2,520 feet, completed
in 1922) is in good condition except where a few capstones have
disintegrated and washed out. The east breakwater (concrete cais-
884     REPORT OF     CHIEF OF ENGINEERS, U.         S.   ARMY,   1934

son, 3,402 feet, completed in 1926) is in good condition, with the ex-
ception of portions of the superstructure, which have disintegrated
to some extent. Depths in the outer harbor channel vary from 23
to 27 feet. Depths in the entrance channel are irregular, varying
from about 19 feet to 24 feet, with a controlling mid-channel depth
of about 22 feet. The controlling depth to the forks is about 20
feet. Depths in the turning basin at The Forks vary from 15 to 25
feet, with the shoaler depths near the entrance to the Calumet River
Branch. Depths in the 550 feet of the Calumet River Branch under
improvement vary from 5 to 14 feet. The controlling depth in the
Lake George Branch is 20 feet for a distance of about 1,400 feet and
18 feet above that point. Depths are based upon soundings taken in
June 1934, and are referred to low-water datum. The mean level
in June 1934 was 0.53 foot below datum. The head of navigation for
commercial vessels is at the Baltimore & Ohio Chicago Terminal
Railroad bridge on the Lake George Branch, about 3 miles from
the outer harbor.
   The part of Indiana Harbor Canal between a point 550 feet south
of the south end of the turning basin at The Forks and the north
line of One Hundred and Forty-first Street, which is to be dredged
by local interests to a depth of 20 feet and a bottom width of 80
feet, has not as yet been completed or accepted by the United States
for widening and deepening.
   The work remaining to be done to complete the existing project is
deepening and widening the west half of the main canal from the
entrance to Dickey Place to full project dimensions and the upper
3,700 feet of the Lake George Branch.
   The total costs and expenditures were $2,078,699.88, of which
$1,771,358.03 was for new work and $307,341.85 for maintenance.
   Public Works funds.-The core stone for the breakwater extension
extends about 950 feet beyond the outer end of the rubble-mound
breakwater and the covering stone has been brought to the water's
surface for a distance of about 300 feet.          The work is 18 percent
completed and in good condition. No dredging has been done under
the Public Works program.
  The total cost was $160,553.17, for new work. Total expenditures
were $122,860.77.
  The grand total cost, all funds, was $2,239,253.05, of which $1,931,-
911.20 was for new work and $307,341.85 for maintenance. The
grand total expenditures were $2,201,560.65.
  Proposed operations.-Thebalance unexpended will be applied to
maintenance, dredging by contract, during the fall of 1934.
  The unexpended balance of Public Works funds, including an
allotment of $700,000 made during July 1934, will be applied as
follows :
Accounts payable June 30, 1934______________-________ _                $38, 812. 70

New work:
   Completing the construction of a breakwater, approximately
     2,320 feet long, under existing contract, about Nov. 1, 1935_     735, 326. 53
   Dredging outer harbor and entrance channel, by contract,
     fiscal years 1935 and 1936__ ____-__                              700, 000. 00

                                                                     1, 435, 326. 53
        Total for new work_______       ____________       ____      1,474,139. 23
                 RIVERS AND HARBORS-CHICAGO,                                             ILL., DISTRICT                          885
   Dredging will be necessary to restore project depth in the inner
harbor canal and minor repairs to the breakwater will be required.
The additional sum of $68,500 can be profitably expended during the
fiscal year 1936 as follows:
Maintenance:
   Dredging inner harbor canal by contract, fall of 1935 --        ___$65, 000
    Repairs to old breakwater by contract or with Government plant
      during the fiscal year ______________________---------------      3, 500
                                                                                                                              68, 500
                                         Cost and financial summary
                              MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934_______________________                                                       $1, 832, 025. 44
Cost of maintenance to June 30, 1934 _________________----__                                                       309, 851. 39
      Total cost of permanent work to June 30, 1934___________                                                  2, 141, 876. 83

Net total expenditures---   -----------------------------                                                       2, 141, 876. 83
Unexpended balance June 30, 1934 _______                                                                            68, 981. 87
      Total amount appropriated to June 30, 1934___________                                                     2, 210, 858. 70

         Fiscal year ending June 30                              1930        1931           1932            1933               1934


Cost of new work . __---------            _              _-----------     $56, 384. 20 $147, 727. 56    $61, 185. 63 --
Cost of maintenance,___---------__--                       $28, 925. 82    19, 000. 91   13, 391. 43     42, 283.93 ----------

      Total cost.. ......         -----.                    28, 925. 82    75, 385. 11   161, 118. 99   103, 469. 56    ------------
Total expended_        __--    ___--------------------      29, 634. 51    53, 183. 53   184, 749. 52   103, 469. 56    --
Allotted------------------------------                      --     --     286, 000. 00 ------------      62, 713. 09         $47, 700. 00


Balance unexpended July 1, 1933-___--___________________                                                           $21, 281. 87
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934                     -.--------------------
                                                  $68, 100.00
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933------------            35,100. 00
                                                                                                                   103, 200. 00

      Amount to be accounted for_        -____-________-                                          ____-  124, 481. 87
Deductions on account of revocation of allotment-- __-                                           ___-----55, 500. 00

         Net amount to be accounted for_______ ____                                        _____        ____           68, 981. 87

Balance unexpended June 30, 1934                                                                                       68, 981. 87

Amount (estimated) required to be appropriated for completion of
                      - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
existing project 1                                                                                                317, 000. 00

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1 - - - - - - - ____
                                             - - - - -   - - -  -
                                                       _____                                                           68, 500. 00
                                                 PUBLIC WORKS FUNDS

Cost of new work to June 30, 1934___                                $160, 553. 17
Cost of maintenance to June 30, 1934_______________        ____   _

      Total cost of permanent work to June 30, 1934____ ____ --      160, 553. 17
Value of plant, materials, etc., on hand June 30, 1934___________      1, 120. 30
      Net total cost to June 30, 1934___________________________     161, 673. 47
Minus accounts payable June 30, 1934___________________________       38, 812. 70
      Net total expenditures- --- -122,                                   860. 77
Unexpended balance June 30, 1934--     --     --    ---                                                        -___774, 139. 23
       Total amount appropriated to June 30, 1934---_,_-                                                           897, 000. 00
1
   Exclusive of available funds.
886          REPORT           OF CHIEF OF ENGINEERS,                               U.      S.    ARMY,            1934


         Fiscal year ending June 30                            1930        1931              1932             1933             1934

Cost of new work_____________
         Cost of nw
            work---               _____------------
                              ------                              ------------ ------------              ------------       $160, 5.1 17
                                                                                                                             $10 553.
Cost of maintenance           ------------------------------------                                                             -
Total expended---------------------------------------------------                                                            122, 860. 77
Allotted__                      __-_______ -- ____---------.
                     ______----------------__                                       .                                   _    897, 000. 00


Amount allotted from National Industrial Recovery Act approved
June 16, 1933-                                                                                                         $937, 000. 00
Deductions on account of revocation of allotment_                                                                         40, 000. 00

      Net amount to be accounted for_                                                                                    897, 000. 00
Gross amount expended__________________________    $122, 992. 50
Less-
    Reimbursements collected----------- $130. 50
    Receipts from sales_          -
                           - _____-- -  -    1. 23
                                                         131. 73
                                                                                                                         122, 860. 77

      Balance unexpended June 30, 1934___        ____      __                                                            774, 139. 23
Outstanding liabilities June 30, 1934______________ $101, 699.96
Amount covered by uncompleted contracts---------- 674, 106. 55
                                                                                                                         775, 806. 51
    Balance available June 30, 1934______________________                                                                -- 1, 667. 28
Amount allotted by Public Works Administration Emergency
Appropriation Act, fiscal year 1935--____---- ____-________                                                             700, 000. 00

         Balance available for fiscal year 1935_-                                 -----         __                332. 72
                                                                                                          -___-698,
Amount (estimated) required to be appropriated for completion
of Public Works Administration project 1__     _____________                                                            856, 000. 00
      CONSOLIDATED COST AND FINANOIAL SUMMARY                                      FOR INDIANA              HARBOR, IND.

Cost of new work to June 30, 1934_________________________                                                        $1, 992, 578. 61
Cost of maintenance to June 30, 1934 _________ ___-____ __                                                            309, 851. 39

      Total cost of permanent work to June 30, 1934____________                                                     2, 302, 430. 00
Value of plant, materials, etc., on hand June 30, 1934___________                                                        1, 120. 30

      Net total cost to June 30, 1934___________________________                                                    2, 303, 550. 30
Minus accounts payable June 30, 1934 ___ ___________________                                                            38, 812. 70

     Net total expenditures-----------    _____--__                                                                 2, 264, 737. 60
Unexpended balance June 30, 1934_______________-_____                                                        _         843, 121. 10

         Total amount appropriated to June 30, 1934_____________                                                    3, 107, 858. 70

         Fiscal year ending June 30                            1930        1931              1932                1933          1934


Cost of new work--_____  ___ __________                  _________      $56, 384. 20 $147, 727. 56         $61, 185. 63 $160, 553. 17
Cost of maintenance ______-- ___-______                  $28, 925. 82    19, 000. 91   13, 391. 43          42, 283. 93 . ..    ..----

      Total cost_______-- -        ______--__        _    28, 925. 82    75, 385. 11      161, 118. 99     103, 469. 56      160, 553. 17

Total expended----------------------                      29, 634. 51    53, 183. 53      184, 749. 52     103, 469. 56      122, 860. 77

Allotted -___--_____                -- _____-       ---------- __ 286, 000. 00
                                                    __                                    .---------        62, 713. 09      944, 700. 00

   1Exclusive of available funds.
             RIVERS AND       HARBORS-CHICAGO,       ILL., DISTRICT             887

Balance unexpended July 1, 1933_________________----$21, 281. 87
Amount allotted from War Department Appropriation
  Act approved Apr. 26,'1934------------------- $68, 100. 00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933__--_______-----------   35, 100. 00
Amount allotted from National Industrial Recovery
Act approved June 16, 1933-------------------    937, 000.00
                                                               1, 040, 200. 00

     Amount to be accounted for______________--___----              1, 061, 481. 87
Deductions on account of revocation of allotment ___-        ____----95, 500. 00

      Net amount to be accounted for ---       ___--------------     965, 981. 87
Gross amount expended                                        992. 50
                                                       $-----------------------122,
Less-
    Reimbursements collected ----------         $130. 50
    Receipts from sales ------       -1. __-
                                ____--                23
                                                               131. 73
                                                                         122, 860. 77

       Balance unexpended June 30, 1934________________---               843,121. 10
Outstanding liabilities June 30, 1934 ____________ . $101, 639. 96
Amount covered by uncompleted contracts__---------    674, 106. 55
                                                                         775, 806. 51

    Balance available June 30, 1934________________________               67, 314. 59
Amount allotted by Public Works Administration Emergency
Appropriation Act, fiscal year 1935__________________________           700, 000. 00
       Balance available for fiscal year 1935-___   _______----767,          314. 59
Amount (estimated) required to be appropriated for completion
of existing improvement 1-    -------                   _    1,173,000.00
Amount that can be profitably expended in fiscal year ending
June 30, 1936, for maintenance ___________________________               68, 500. 00

                       9. MICHIGAN CITY HARBOR, IND.

   Location.-Northwestern Indiana (in La Porte County), on the
southeasterly shore of Lake Michigan, 38 miles in a southeasterly
direction from Chicago Harbor. (See U. S. Lake Survey Chart
No. 75.) For description see page 1482 of Annual Report for 1932.
   Previous projects.-Adopted by River and Harbor Act of July 4,
1836, and work was continued under this project until 1870, total
cost and expenditure being $287,388.97. For further details see page
1944 of Annual Report for 1915.
   Existing project.-This provides for a detached breakwater, east
and west entrance piers, and a dredged channel, 120 to 150 feet wide
and 18 feet deep, from Lake Michigan to the upper of two turning
basins, which are also to have a depth of 18 feet.
   The project depth is referred to low-water datum for Lake Mich-
igan, which is taken at 578.5 feet above mean tide level at New York.
This depth corresponds to a depth of 16.9 feet on the Lake Survey
Chart of this locality.
   Seasonal fluctuations in mean stage from low water in winter to
high water in summer average about 1.2 feet. Local and temporary
fluctuations of 0.1 to 0.5 foot, due to wind and difference in baro-
metric pressures, occur daily. Seiches of 3 to 4 feet occur at infre-
quent intervals.
  I Exclusive of available funds.
888    REPORT   OF   CHIEF OF ENGINEERS, U.    S. ARMIVIY,   1934

   The estimate of cost for new work, revised in 1927, is $1,153,600.
exclusive of amount expended on previous project. The latest (1927)
approved estimate for annual cost of maintenance is $6,000.
   The existing project is based on the following reports and river
and harbor acts: The " east breakwater " and " old east pier " enclos-
ing the outer basin were based on the recommendations of a board of
engineers as published in Annual Report for 1870. The original en-
trance piers were constructed prior to the project of 1870. The east
pier was extended in accordance with -reports of boards of engineers
as published on pages 2187-2189, Annual Report for 1881, pages
2264-2266, Annual Report for 1882; and in accordance with River and
Harbor Act of March 3, 1899. The west pier as at present located and
the present entrance-channel dimensions were authorized by joint
resolution of Congress approved May 13, 1908 (Public, No. 23).
The upper limit of the inner channel is in accordance with the An-
nual Report for 1882. The act of.March 3, 1899, provided for the
detached breakwater in accordance with the report published on
pages 2903-2904, Annual Report for 1897; the act of March 3, 1905,
provided for the lower turning basin. The act of January 21, 1927,
provided for the present depth in the channel and turning basins, the
elimination of the improvement of Trail Creek above the middle
turning basin and of the uncompleted portion of the detached break-
water, and the abandonment of the old breakwater and pier enclosing
the harbor basin (H. Doc. No. 279, 69th Cong., 1st sess.). The
latest published map appears opposite page 2938, Annual Report for
1914.
   Local cooperation.-Complied with.
   Terminal facilities.-The terminal facilities at this harbor consist
of about 15,000 feet of wharfage, about 2,000 feet of which is owned
by the city. About 1,000 feet is in use. The terminal facilities are
considered adequate for existing commerce.
   Operations and results during fiscal year.-None. Total expendi-
tures were $5,912.61, applied to accounts payable for the preceding
fiscal year.
   Condition at end of f#scal year.-The existing project was com-
pleted in 1929, at a saving of $13,693 under the estimated cost. Con-
crete superstructure was completed on the detached breakwater in
1925 and on the entrance piers in 1931. All structures are in good
condition with the exception of 615 feet of the inner end of the west
pier, which is to be removed by the Northern Indiana Public Service
Co. under Secretary of War permit. The controlling depth at the
harbor entrance is 15 feet. Depths in the entrance channel up to the
Franklin Street Bridge vary from 171/2 to 21 feet. Between the
Franklin Street Bridge and the bend immediately below the Michi-
gan Central Railroad bridge the controlling depth is 12 feet. From
the latter point to the head of the project, 81/2 feet.
   Depths are based upon soundings taken in April 1934 and are
referred to low-water datum. The mean water level in June 1934
was 0.53 foot below datum. The head of navigation for commercial
vessels is the turning basin at the head of the project, 1.04 miles
above the outer end of the west pier. Above this point depths are
sufficient for small launches only.
                RIVERS AND HARBORS-CHICAGO,                                  ILL., DISTRICT                      889
  The total cost was $2,108,538.95, of which $1,139,906.39 was for
new work and $968,632.56 for maintenance. Total expenditures
were $2,108,538.95.
  Proposed operations.-The balance unexpended will be applied as
follows:
Maintenance:
    Dredging with Government plant, summer of 1934________-- $10, 080. 00
    Riprapping detached breakwater, by contract, summer of 1934_ 6, 484. 54
        Total        ---------------------------------------------                                        16, 564. 54
   Dredging will be necessary to restore project depth in the chan-
nels. Minor repairs to the piers and breakwater will be required.
The additional sum of $7,700 can be profitably expended during the
fiscal year 1936, as follows:
Dredging with Government plant, summer of 1935___------------------ $5, 700
Repairs to piers and breakwater by contract or with Government plant
  during the fiscal year  ---------------------------------------    2, 000
        Total        ------------------------------------------------                                           7, 700
                                   Cost and financial summary
Cost of new work to June 30, 1934-----------------------$1, 427, 295. 36
Cost of maintenance to June 30, 1934------------------------ 968, 632. 56
        Total cost of permanent work to June 30, 1934                        -----------           2, 395, 927. 92

Net total expenditures----------------------------------                                           2, 395, 927. 92
Unexpended balance June 30, 1934--------------------------                                             16, 564. 54
         Total amount appropriated to June 30, 1934                          -----------           2, 412, 492. 46

        Fiscal year ending June 30                  1930         1931             1932         1933             1934


Cost of new work - - -         -   -      -   - -     -      - - -            - -      -       -- ----------
Cost of maintenance -$59,                           954. 74 $164, 006. 55     $95, 127. 90   $7, 056. 73-
Total expended ___________________________      65, 287. 17   159, 674. 57     94, 520. 68    1,144. 12        $5, 912. 61
Allotted ......___________   __________       265, 400. 00    113, 000. 00 -41, 000. 00 -21, 025. 90           14, 300. 00


     Balance unexpended July 1, 1933-------------------------                                             $8, 177. 15
Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934-------    -----------------------------------                                              16, 300. 00

      Amount to be accounted for---------------------------                                               24, 477. 15
Deductions on account of revocation of allotment -__                                                       2, 000. 00

      Net amount to be accounted for -------  ----------                                                  22, 477. 15
Gross amount expended_------------------------------------                                                 5, 912. 61

         Balance unexpended June 30, 1934----------------------16, 564. 54

Amount that can be profitably expended             in fiscal year ending
                                 - - - - - - - - - - - -- - - - - - - - - -
June 30, 1936, for maintenance 1                                           __                              7, 700. 00

   1Exclusive    of available funds.
890          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                            1934

  10.     EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                              (GENERAL)

  The cost of work during the year was $19,065.88; the expenditures
were $18,069.97. The balance unexpended June 30, 1934, will be ap-
plied as needed during the fiscal year 1935 to payment of expenses
to be incurred in connection with the above items. The additional
sum of $25,000 can be profitably expended during the fiscal year
ending June 30, 1936.
                                        Cost and financial summary
Cost of maintenance to June 30, 1934__________________-----__                                          $109, 888. 30
                                      -----------
Plus accounts receivable June 30, 1934____________                                                           207. 95

      Gross total costs to June 30, 1934 ---------------------                                          110, 096. 25
Minus accounts payable June 30, 1934_____________-_________                                               1, 441. 16

     Net total expenditures________--______                                                             108, 655. 09
Unexpended balance June 30, 1934__________-----------                                                    25, 468.59

          Total amount appropriated to June 30, 1934_____                                    __         134, 123. 68

          Fiscal year ending June 30              1930           1931            1932           1933            1934

Cost of new work- .................
Cost of maintenance .....-------------------    $8, 689. 64   $12, 005. 43    $24, 056. 79   $21, 343. 81     $19, 065. 88
Total expended...-----------------------10, 065. 20            12, 340. 74     24, 036. 79    21, 162. 53      18, 069. 97
Allotted------------------------------_ _        6, 500. 00    29, 230. 00      2, 000. 00    23, 232. 23      40, 411. 45


Balance unexpended July 1, 1933_____________________________                                                $3, 127. 11
Amount allotted from War Department Appropria-
  tion Act approved Apr. 26, 1934____ ______-__ $21, 000. 00
Amount allotted from War Department Appropria-
  tion Act approved Mar. 4, 1933 -- ___________-20, 000.00
                                                                                                            41, 000. 00

      Amount to be accounted for____         _      _________                                               44, 127.11
Deductions on account of revocation of impounded funds ___---__                                                 588. 55

      Net amount to be accounted for__________                                 -_______                     43, 538. 56
Gross amount expended-        ____                                              $24, 453. 02
Less reimbursements collected -----------                                    -    6, 383. 05
                                                                                                            18, 069. 97

      Balance unexpended June 30, 1934 ______________-----_                                                 25, 468. 59
Outstanding liabilities June 30, 1934_ .... ______ ____-----                                                 1, 441. 16

      Balance available June 30, 1934__--  ____-------                                                      24, 027. 43
Accounts receivable June 30, 1934_------ ----------------------                                                 207. 95

     Unobligated balance available June 30, 1934______________                                              24, 235. 38
Amount that can be profitably expended in fiscal year ending
                                   -- --- - - - --------------- ---
June 30, 1936, for maintenance 1                                                                           25, 000. 00

   1 Exclusive of available funds.
            RIVERS AND IIARBORS-NASHVILLE,                                  TENN., DISTRICT                891
Status of reports called for by river and harbor acts and committee resolutions


        Locality                  Authorization Act         Transmitted
                                                                             Document No.
                                                                                                  Recommenda-
                                                            to Congress                               tion

Calumet River, Little Rivers and Harbors
   Calumet River, Grand       Committee resolu-
   Calumet River, and         tion, May 10, 1934.
   Sag Channel, Ill., and
   Grand Calumet River
   and Indiana Harbor
   Canal, Ind.
Calumet-Sag Channel, River and Harbor Act, Dec. 13, 1933                  House 180, 73d Cong.,   Favorable,
   Ill.                       July 3, 1930.                                2d sess.
Illinois River, Ill .__.  . .---- do . ......
                                            _. ......Mar. 17, 1934        House 184, 73d Cong.,      Do.
                                                                           2d sess.
Illinois Waterway, and        River and      Harbor
   waterway from Lake           Committee resolu-
   Michigan to Missis-         tion, June 15, 1934.
   sippi River.
Michigan City Harbor,         River and       Harbor
   Ind.                         Committee resolu-
                                tion, Oct. 10, 1933.



    IMPROVEMENT OF RIVERS AND HARBORS IN THE
            NASHVILLE, TENN., DISTRICT
  This district includes the entire drainage basins of the Cumber-
land and Tennessee Rivers. The district embraces all except a very
small portion of eastern and middle Tennessee, a large portion of
western Tennessee, and portions of eastern and western Kentucky,
western North Carolina, southwestern Virginia, northern Georgia,
northern Alabama, and northern Mississippi.
  District engineer: Maj. Frank S. Besson, Corps of Engineers, to
July 24, 1933; Maj. R. R. Neyland, Jr., Corps of Engineers, from
July 24, 1933, to March 5, 1934; and Maj. C. E. Perry, Corps of Engi-
neers, since that date.
  Division engineer: Lt. Col. R. C. Moore, Corps of Engineers, act-
ing division engineer to July 28, 1933; Col. George R. Spalding,
Corps of Engineers, July 29 to November 27, 1933; Lt. Col. E. L.
Daley, Corps of Engineers, from November 28 to November 30,
1933; and Lt. Col. R. G. Powell, Corps of Engineers, since that date.
                                                IMPROVEMENTS

                                                      Page                                                 Page
1. Cumberland River, Tenn. and                                 6. Operation, maintenance, and
    Ky., below Nashville_____                         891           repair of Dam No. 2, Ten-
2. Operating -and care of locks                                    nessee River, including the
    and dams on Cumberland                                         hydroelectrical d e v e lo p -
       River--------------_____                       895          ment_-----------------                      911
3. Improvement             of      Tennessee                   7. Examinations, surveys, and
       River_____--_____-_____--                      898          contingencies (general) ___                 912
4. Operating and care of canals                                8. Other projects for which no
     and locks and dams on                                         estimates are submitted_-_                  913
       Tennessee River .________                      907
5. Tennessee River, Dam No. 2,
      Muscle Shoals, Ala________                      909

      1. CUMBERLAND RIVER, TENN. AND KY., BELOW NASHVILLE

    Location.-This river is formed by the junction of Poor and
Clover Forks in Harlan County, Ky., about 687 miles above its
892        REPORT OF CHIEF                    OF ENGINEERS,                 U.     S.   ARMY,      1934

mouth, and flows west to Burnside, Ky., from whence it makes a
loop into Tennessee, passes Nashville, and returns to Kentucky,
emptying into the Ohio near Smithland, Ky. (See United States
post-route maps of Kentucky and Tennessee.)
   Previous projects.-The River and Harbor Act of July 17, 1832,
made the first appropriation for this section of the river, but the
River and Harbor Act of March 3, 1871, was the first to define a
project for its improvement. The River and Harbor Act of Septem-
ber 19, 1890, adopted a. special project for the improvement of the
mouth of the river. The total cost and expenditures on all projects
prior to the adoption of present or canalization project in 1892 were
$460,000, all of which was for new work. For further details of
previous projects see page 1901 of Annual Report for 1915.
   Existing project.-This provides for the construction of six locks
and dams (Locks A to F), beginning with Lock A, 40.4 miles below
Nashville, and ending with Lock F, 147.4 miles below Nashville, to
secure 6-foot navigation at low water between Lock F and Lock 1,
the first lock constructed under the project for the section of the
river above Nashville.
   The construction of Lock and Dam No. 52, Ohio River, has created
a pool of more than 6-foot depth in the Cumberland River as far
as Lock and Dam F.
   The following table shows the principal features of the locks and
dams included in the project:

                                                Lock A                        Lock B                    Lock C


                               Fox Bluff, Tenn., at
Nearest railroad station-----------                                   Hickory Point, Tenn.,      Sailors Rest, Tenn.,
                                station.                               2y miles.                   1 mile.
Distance above mouth of river-... 150.6 miles                         140.3 miles . ---------- 108.5 miles.
Lock dimensions 1                 52 by 280 feet----------            52 by 280 feet -.------- 52 by 280 feet.
Lift above normal pool of dam 12.9 feet_________                      12.2 feet ._____________ 12 feet.
  below.
            on sills
Depth on miter   itr aat lw
                ill       low wwater6.5
                                te 1 6.7 feet,
Character of foundation__________ Rock
                                         feet, upper
                                               lower_     ---   - 6.5 feet, upper
                                                                  6.3 feet,               6.5 feet.
                                                                            lower... --------
                                                                  Rock __________________ Rock.
Kind of dam___                     Fixed______________-               Fixed_________________     Fixed.
Type of construction ............. Stone masonry lock,                Concrete lock, tim ber     Concrete lock, tim-
                                     timber crib dam.                   crib dam.                  ber crib dam.
Placed in operation                Nov. 26, 1904__________            Nov. 9, 1916_______        Sept. 2, 1918.
Cost of lock and dam_____________ $392,223.15 -     -                 $573,005.43 ...........    $604,782.76.


                                                Lock D                        Lock E                      Lock F


Nearest railroad station   ---------     Bear Spring,    Tenn.,       Cadiz, Ky., 12 miles___ Eddyville,       Ky.,   at
                                          534 miles.                                           station.
Distance above mouth of river       --   88.0 miles_              -   66.3 miles                 43.6 miles.
Lock dimensions 1           _   -                              52 by 280 feet-..........
                                         52 by 280 feet-..........                   52 by 280 feet.
Lift above normal pool of dam 10.9 feet_                              10.5 feet_                 7.4 feet.
  below.
                                   6.5 feet,
Depth on miter sills at low water 16.6       upper
                                       feet, lower      - ----         6 feet, upper
                                                                      7.0               ---      6.5 feet, upper.
                                                                      6.5 feet, lower. __ ____ _ 12.4 feet,
                                                                                                        2   lower.
Character of foundation__________        Rock 2                       Rock 2________________     Rock.
Kind of dam_______                       Fixed_                       Fixed_         _           Fixed.
Type of construction __-___-...          Concrete lock, timber        Concrete lock, timber      Concrete lock, tim-
                                             crib dam.               crib dam.               ber crib dam.
Placed in operation____                    Dec. 21, 1916__________ Nov. 20, 1922__________ Nov. 1, 1923.
Cost of lock and dam                .___________                   $940,833.05 -..........
                                           $504,095.17 .-...........                       $1,006,943.71.

  1 Clear width and length available for full width.
  2Abutment founded on piles; dam partly on rock and partly on gravel.
  The extreme fluctuation in the stage of the river varies from about
55 to 60 feet at different localities. Fluctuations below extreme high
        RIVERS AND HARBORS-NASHVILLE,         TENN.,   DISTRICT    893

water are so variable that it is impracticable to fix the stage com-
monly referred to on other streams as ordinary high water.
   Excluding amount expended on previous projects, the estimated
cost of the project, revised in 1919, was $4,596,448. For a detailed
statement of this revision see page 1282, Annual Report for 1920.
   The existing project was authorized by the following river and
harbor acts: The act of July 13, 1892, provided for Lock A (Annual
Report for 1890, p. 2151); the act of June 25, 1910, provided for
Locks B to F, and for the dredging below Lock F (H. Does. Nos.
758, 60th Cong., 1st sess., and 1481, 60th Cong., 2d sess.). For map
see House Document No. 1481, Sixtieth Congress, second session,
page 8.
   Supplementing the work authorized by Congress, the repairing of
existing Dams A to F and raising them by movable crests, as recom-
mended by the Chief of Engineers in House Document No. 38,
Seventy-third Congress, first session, has been included in the Public
Works program under the National Industrial Recovery Act.
   Recommended modifications of project.-Includedin Public Works
program.
   Terminal facilities.-At Nashville, Tenn., there is a five-story ter-
minal building 300 feet long and 140 feet wide, built of reinforced
concrete, having large and convenient loading platforms. There are
also two railway inclines for transferring freight between cars and
river vessels. At Clarksville, Tenn., there is a warehouse with in-
cline tramway. At Dover, Tenn., there are two warehouses with
incline tramways. At Fox Bluff, Tenn., there is a railway incline
owned by the Tennessee Central Railway Co.; however, this incline
is now in a state of disrepair.
   Operations and results during fiscal year.-There were no opera-
tions during the year under regular funds.
   With funds received from the Public Works Administration, metal
work and other materials were purchased for installing movable
steel crests on Dams A-F, and contract was entered into for in-
stalling the crests. No permanent work was done under this project
during the fiscal year. The total expenditures were $128,881.42, all
from Public Works funds.
   Condition at end of fiscal year.-All the locks and dams under
the existing project have been completed. Since the completion of
Dam 52, Ohio River, during 1928, year-round 6-foot navigation is
afforded from the mouth of the river to Lock F. Between Lock F
and Nashville there are several shoals over which the controlling
depth is 5 feet.
   A contract has been entered into for installing movable crests
on Dams A to F.
   The total costs have been $4,312,767.83, of which $4,253,698.41 is
for new work and $59,069.42 for maintenance from regular funds.
The total expenditures were $4,441,649.25, including $128,881.42 from
Public Works funds.
   Proposed operaltions.-The balance unexpended of funds allotted
from the Natipnal Industrial Recovery Act ($739,118.58) will be
applied as follows:
 894          REPORT         OF CHIEF OF ENGINEERS, U. S. ARMY,                                                        1934

New work :
    Accounts payable June 30,, 1934 ------------------------                                                                 $3, 747. 71
       Surmounting Dams A to F, inclusive, with movable crests by
         contract, July 1 1934-June 30, 1935 ________________-         590, 370. 87
       Engineering, inspection, and contingencies               ___ _ 85, 000. 00
       Settlement of flowage claims for land overflowed as a result of
                                                                                         ________
         raising the heights of Dams A to F, inclusive___________ 60, 000. 00

              Total for new work_                                        -
                                                                 -___________- __---                              -_     735, 370. 87

              Grand total (including accounts payable)                                     -------------                 739, 118. 58
   No additional funds can be profitably expended during the fiscal
year 1936.
                                         Cost and finanoial summary
                               MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934____________
                                     -               ____-__  $4, 713, 698. 41
Cost of maintenance to June 30, 1934------------------------      59, 069. 42
       Total cost of permanent work to June 30, 1934----------4, 772, 767. 83
Net total expenditures--   -----------------------------       4, 772, 767. 83
Total amount appropriated to June 30, 1934----------------4, 772, 767. 83

    Fiscal year ending June 30                  1930                  1931                1932               1933               1934


Cost of new work____ ....     ____.              $731. 50          $5, 233. 04
Cost of maintenance .....              ------------ --------                             -------- -----------------------
Total expended ...------------------               131. 27            5, 621. 54          -$75. 00

Allotted...----------------------20,               629. 07 --------------------------                       -$286. 50


                                                 PUBLICO WORKS FUNDS,

Cost of new work to June 30, 1934__________________---------------------
Cost of maintenance to June 30, 1934_________________---.------------
Value of plant, materials, etc., on hand June 30, 1934----------- $132, 629. 13

Net total cost to June 30, 1934__-----------------------------                                                           132, 629. 13
Minus accounts payable June 30, 1934-----------------------                                                                3, 747. 71

     Net total expenditures_----     ----------------------                                                              128, 881. 42
Unexpended balance June 30, 1934_ ---------------   ____--__                                                             739, 118. 58

           Total amount appropriated to June 30, 1934                                            -___---- __- -          868, 000. 00

   Fiscal year ending June 30                   1930                  1931                1932              1933                1934


Cost of new work ...-------------------    -                             -----------------------------------------
Cost of maintenance---------------------------                       -----------------------------------------------

Total expended ...           _------------------------------------------------------                                          $128,881.42

Allotted    ---------           -----------------------                                ------------------------                868, 000. 00

Amount allotted from National Industrial Recovery Act approved
  June 16, 1933----------------------------------------                                                                 $868, 000.00
Gross amount expended-------__   ---------------------------                                                             128, 881. 42

           Balance unexpended June 30, 1934_-------------_                                           -          -        739, 118. 58
Outstanding liabilities June 30, 1934_ ___-__                                                 $43, 658.50
Amount covered by uncompleted contracts---------                                              360, 000. 00
                                                                                                                         403, 658. 50
           Balance available June 30, 1934_                                                                                  460. 08
                                                                                                                         3___---8------335,
                 RIVERS AND HARBORS-NASHVILLE,                                  TENN., DISTRICT                 895
   CONSOLIDATED COST AND FINANCIAL SUMMARY                                 FOR CUMBERLAND RIVER           BELOW
                                                    NASHVILLE


Cost of new work to June 30, 1934___________                                                           713, 698. 41
                                                                                                     $_________--___$4,
Cost of maintenance to June 30, 1934--------------------------                                          59, 069. 42
      Total cost of permanent work to June 30, 1934__                                   _____        4, 772, 767. 83
Value of plant, materials, etc., on hand June 30, 1934------------_                                     132, 629. 13
      Net total cost to June 30, 1934--------------------------                                      4, 905, 396. 96
Minus accounts payable June 30, 1934_________________________                                             3, 747. 71
     Net total expenditures_ _      _____________________                                            4, 901, 649. 25
Unexpended balance June 30, 1934____________________________                                           739, 118. 58

           Total amount appropriated to June 30, 1934___________                                     5, 640, 767. 83

   Fiscal year ending June 30               1930              1931             1932           1933          1934


Cost of new work-
Cost of maintenance...
                         _
                                -
                                             $731. 50        $5, 233. 04   -
Total expended. -                             131. 27        5, 621. 54        -$75. 00 ___               $128, 881. 42
Allotted     -       -                   -20, 629. 07   -_                                -$286. 50        868, 000. 00


Amount allotted from National Industrial Recovery Act ap-
proved June 16, 1933 __________________________________                                              $868, 000. 00
Gross amount expended________-_______-___________                                                      128, 881. 42

      Balance unexpended June 30, 1934______                                      __________           739, 118. 58
Outstanding liabilities June 30, 1934_-----------_                                $43, 658. 50
Amount covered by uncompleted contracts-------                                    360, 000. 00
                                                                                                       403, 658. 50

           Balance available June 30, 1934_______________________                                      335, 460. 08

2. OPERATING AND CARE OF LOCKS AND DAMS ON CUMBERLAND
                         RIVER

   The above work forms part of the project for Cumberland River,
Tenn. and Ky. See pages 739 to 746, Annual Report for 1933,
where general information regarding the improvement can be found.
Locks A and No. 1 have been operated under the permanent indef-
inite appropriation since July 1, 1905. Locks B to E and nos. 2 to
7, inclusive, have been so operated since the dates of their respec-
tive completion, as shown on pages 892 and 896. Lock F has been
so operated since January 1, 1925. Lock 8 has been so operated
since July 1, 1925, and Lock No. 21, since October 20, 1911.
   The following table shows the principal features of the locks and
dams included in the projects for the Cumberland River above
Nashville:
       91536---ENG 1934-            57
896          REPORT         OF    CHIEF OF ENGINEERS,                        U.    S.   ARMY,         1934



                                 Lock No. 1              Lock No. 2               Lock No. 3              Lock No. 4


Nearest railroad sta- Nashville, Tenn.,        Madison, Tenn.,         Hendersonville,             Gallatin, Tenn., 5
  tion.                     2% miles.             1% miles.              Tenn., 3 miles.             miles.
Distance above mouth 188.4 miles- _            201 miles     _-------- 218.1 miles - ------237 miles.
  of river.
Lock dimensions 1 -- -   52 by 280 feet .....  52 by 280 feet .----    52 by 280 feet ___          52 by 280 feet.
Lift above normal pool 9.5 feet ....---------- 8 feet-----------       12 feet---------- 12.4 feet.
  of dam below.
Depth on miter sills at J9.5 feet upper ----   6.5 feet                6.6 feet-........
                                                                .----------                        7 feet.
  low water.            16.5 feet lower--_     9.5 feet.---------- 6.5 feet         ...---------- 6.6 feet.
Character of foundation_ Rock...-----------    Rock-----------         Rock...        ..-----------Rock.
Kind of dam .---------Fixed----------- Fixed ----------- Fixed                            _-----------
                                                                                                   Fixed.
Type of construction_-- Stone masonry Stone masonry Stone masonry Stone masonry
                            lock, timber crib     lock, timber crib      lock, timber crib           lock, timber crib
                            dam.                  dam.                   dam.                        dam.
Placed in operation -    Nov. 26, 1904- ....   Oct. 9, 1907-......      Oct. 15, 1908.....         Nov. 17, 1909.
Cost of lock and dam _- $395,634.45-           $340,241.65 ......... $348,354.46- __--- $346,429.99.


                                 Lock No. 5              Lock No. 6               Lock No. 7              Lock!No. 8


Nearest railroad sta- Lebanon, Tenn.,               Hartsville, Tenn.,          Carthage, Tenn., Carthage, Tenn., 5
  tion.                      10 miles.                  4 miles.                   82 miles.            miles.
Distance above mouth 264.7 miles_                   281.6 miles-.......         299.7 miles-......    317 miles.
  of river.
Lock dimensions 1---.     52 by 280 feet----..      52 by 280 feet-...... 52 by 280 feet- ..... 52 by 280 feet.
Lift above normal pool 11.7 feet.--------- 12 feet----------..... 12 feet---------- 12.8 feet.
  of dam below.
Depth on miter sills at /6.6 feet ..---------          6 feet6.5                     feet----------_ 6.7 feet.
  low water.                     ..
                         17 feet---------         J              ------         6.6 feet----------_ 6.6 feet.
Character of foundation. Rock----------- Rock .......-----------.               Rock ....-----------. Rock.
Kind of dam.---------F_     ixed ..                 Fixed--
                                         ..-----------              .._---------Fixed .-----------Fixed.
Type of construction_     Stone masonry Stone masonry Stone masonry Concretelock, tim-
                            lock, timber crib          lock, timber crib           lock, timber crib    ber crib dam.
                             dam.                       dam.                       dam.
Placed in operation -     Oct. 18, 1909- _-.        Oct. 21, 1910- ....         Oct. 18, 1910- ..... Sept. 15, 1924.
Cost of lock and dam__ $373,590.40 -_..             $369,357.48_-......         $378,568.15-.....-___ $680,915.21.


                                 Lock No. 9              Lock No. 10              Lock No. 11             Lock No. 12


Nearest railroad sta- Gordons vil 1e,               Double Springs,          Double Springs, Livingston, Tenn.,
  tion.                      Tenn., 12 miles.           Tenn., 19 miles.       Tenn., 20 miles.     :19 miles.
Distance above mouth 331.6 miles ... -              348.3 miles         ,_   364.5 miles-.....  _ 382.9 miles.
  of river.
Lock dimensions 1--- _ 52 by 280 feet .-----52 by 280 feet ......            52 by 280 feet-.....l   52 by 280 feet.
Lift above normal pool 12.75 feet         --------  12.75 feet --------      12.75 feet --------     12.75 feet.
  of dam below.
Depth on miter sills at 6.5 feet ----------        6.5 feet ----------       6.5 feet.----------     6.5 feet.
  low water.
Character of foundation_ Rock-----------           Rock -----------          Rock -----------. Rock.
Kind of dam ------Fixed ----------                  Fixed..-----------       Fixed ---          -     Fixed.
Type of construction___ Concrete lock,              Concrete lock,           Concrete lock, Concrete lock, tim-
                           timber crib dam.            timber crib dam.         timber crib dam.         ber crib dam.
Year completed      ..-- (2)       ------           (2)    ----              (2)       ---            (2).
Estimated 3cost of lock $780,500                   $756,500...---------
                                              _---------                     $735,500.                $764,000.
                                                                                             ..---------
  and dam.


                                      Lock No. 13                     Lock No. 14                    Lock No. 15


Nearest railroad station --    Livingston, Tenn., 29            Livingston, Tenn., 35          Glasgow, Ky., 38 miles.
                                 miles.                           miles.
Distance above mouth of        396.8 miles...------..------..   419.3 miles _------------      437.8 miles.
  riveri
Lock dimensions 1----..        52 by 280 feet ....---------     52 by 280 feet------------     52 by 280 feet.
Lift above normal pool of      12.75 feet         __            12.75 feet-----    -------     12.75 feet.
  dam below.
Depth on miter sills at        6.5 feet- -----..---------       6.5 feet--------------         6.5feet.
  low water.
Character of foundation_--     Rock      ....---------------    Rock --                        Rock.
Kind of dam     _----------_   Fixed---------------             Fixed ._---------------        Fixed.
Type of construction .....     Concrete lock, timber            Concrete lock, timber          Concrete lock,     timber
                                  crib dam.                        crib dam.                      crib dam.
Year completed.-...            (2)-                             (2)          -----     -       (2).
Estimated cost of lock         $766,000--------------           $749,000__-------------        $784,000.
and dam.


  See footnotes on p. 897.
            RIVERS AND             HARBORS-NASHVILLE                            TENN.,       DISTRICT               897

                                     Lock No. 16                      Lock No. 17                  Lock No. 21

Nearest railroad station-_..   Burnside, Ky., 35 miles_ Burnside, Ky., 28 miles_ Burnside, Ky., 29 miles.
Distance above mouth of        460.6 miles ------------ 471.8 miles   ..           487.3 miles.
                                                                           _-----------
  river.
Lock dimensions 1 --..         52 by 280 feet ---------- 52 by 280 feet ....--------.        52 by 2804 feet.
Lift above normal pool of      12.75 feet-------------12.75 feet-------------                14 feet.
  dam below.
Depth on miter sills at        6.5 feet ---------------- 6.5 feet-------------               6.5 feet.s
  low water.
Character of foundation__.     Rock.._______________          Rock---------------- Rock.
Kind of dam __.. _______ .     Fixed-      -     -            Fixed.--------------- yFixed.
Type of construction ....      Concrete lock, timber          Concrete lock, timber Concrete.
                                 crib dam.                      crib dam.
Year completed...---------     (2).____________._____         (2)--___--__       --          Oct. 20, 1911.
Estimated cost of lock         $718,000...--------------.     $877,000--------------....     $361,498.20.
and cam.3

  1 Clear width and length, available for full width.
  2 Construction not yet commenced.
  8 Estimate made in 1919.
  4 19.5 feet above low water, open river.
    Low water in the open river gives only 1 foot on the lower miter sill.

   Operationsand results duriing fiscal year.-The 15 locks were oper-
ated; dwellings, grounds, locks, and floating plant were cared for.;
and snags and other obstructions were removed from the channel.
The work of recapping Dam No. 5 with concrete was completed. All
work done was with Government plant and hired labor. The costs
for the year were $238,763.72. The total expenditures were $192,-
167.40.
   Condition at end of fiscal year.-For condition of canalization, see
the Annual Report for 1933, page 745, for the section above Nash-
ville, and page 893 of this report for the section below Nashville.
The total costs to the end of the fiscal year were $2,872,966.06. The
total expenditures were $2,994,624.35.
  Proposed operations.-The locks and dams will be operated and
maintained under allotments from appropriations made available for
such purposes.
                                     Cost and financial summnary

Cost of maintenance to June 30, 1934____________________-__ _                                          2, 872, 966. 06
Value of plant, materials, etc., on hand June 30, 1934___________                                         134, 085. 52

      Net total cost to June 30, 1934__   1________1    1_______                                          3, 007, 051. 58
Plus accounts receivable June 30, 1934 --.....       ______----                                                3, 268.57

     Gross total costs to June 30, 1934                  3, 010, 320. 15
Minus accounts payable June 30, 1934_______________________15, 695. 80

     Net total expenditures_________________________                                                   2, 994, 624. 35
Unexpended balance June 30, 1934________________________                                                    7. 781.47

         Total amount appropriated to June 30, 1934______________                                      3, 002, 405. 82


    Fiscal year ending June 30              1930              1931              1932            1933              1934

Cost of new work       ---- ----------..-------                                 --
Cost of maintenance--._---------- $177, 925.15 $172, 486. 41                 $230, 428. 24   $181, 563.18       $238, 763. 72
Total expended ..- ---------------       175,687.67         181, 039.26       225, 270. 96    180, 948. 30       192, 167. 40
Allotted_                                200, 000. 00       175, 000. 00      232, 500. 00    177, 425. 54       147,907.92
898      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                          1934

Balance unexpended July 1, 1933_---------------                  $52, 040. 95
Amount allotted from permanent indefinite appropriation, sec. 6,
  River and Harbor Act, Mar. 3, 1909--------------------------- 159, 000. 00

      Amount to be accounted for__                                             211, 040. 95
Deductions on account of revocation of allotment_-----                          11, 092. 08
      Net amount to be accounted for                                      199, 948. 87
Gross amount expended----------------------------$208, 165. 22
Less-
    Reimbursement collected-------------- $14, 693. 72
    Receipts from sales                       , 304. 10
                                             1------------------
                                                              15, 997. 82
                                                                          192, 1.67. 40

      Balance unexpended June 30, 1934-----            -------                    7, 78. 47
Outstanding liabilities June 30, 1934                               -----        17, 022. 36

       Balance available June 30, 1934 ..--                                    -- 9, 240. 89
Accounts receivable June 30, 1934--------------------------------3, 268. 57

       Unobligated balance   available   June 30, 1934----------------5, 972. 32
Amount allotted for fiscal year 1935_ __           _----------                  98, 300. G0

       Balance available for fiscal year 1935_---------------------            192, 327. 68

                 3. IMPROVEMENT OF TENNESSEE RIVER

  Location.-The Tennessee River is formed by the junction of the
French Broad and the Holston Rivers in eastern Tennessee, 4.4 miles
above the Gay Street Bridge at Knoxville, flows southwest into
northern Alabama, thence in a generally westerly course across north
Alabama, and from the northeast boundary of Mississippi nearly due
north across Tennessee and Kentucky, entering the Ohio River at
Paducah, 652.1 miles from the junction of the French Broad and
Holston Rivers. See United States post-route maps of Kentucky
and Tennessee. For description of the river see page 1202, Annual
Report for 1932.
  Previous projects.-
   (A) Above Chattanooga: Adopted by the River and Harbor Acts
of August 30, 1852, June 10, 1872, August 18, 1894, and July 25, 1912.
   (B) Chattanooga to Riverton: Adopted by the River and Harbor
Act of July 25, 1868, acts of April 26, 1904, and January 7, 1905, and
River and Harbor Acts of August 30, 1852, March 2, 1907, and June
25, 1910.
   (C) Below Riverton: Adopted by the River and Harbors Acts of
July 25, 1868, September 19, 1890, August 18, 1894, March 3, 1899,
and July 25, 1912.
  The costs were as follows:
Projects 1852, 1871, 1894, and 1912, above Chatta-
  nooga:
    New work-------------------------------        $2, 350, 128.26
    Maintenance------------------------------          207, 578. 10
                                                                            $2, 557, 706. 36
Projects 1852 and 1860 for work between Knoxville and Kellys
  Ferry: New work-------------------------------------------                     51, 406. 94
Projects 1868, 1871, 1890, 1904, 1907, 1910, 1912,
  1916, and 1925, Chattanooga to Riverton:
      New work ----------------------                    $9, 984,016. 07
      Maintenance ----..---    ------------                  419, 575. 70
                                                                            10, 403, 591. 77
         RIVERS AND HARBORS-NASHVILLE,              TENN.,. DISTRICT           899

Projects 1868, 1890, 1894, 1899, and 1912, below
  Riverton :
    New work             _       ----            $1, 621, 641. 39
    Maintenance-------------------------------488, 872. 27
                                                                    $2, 110, 513. 6-

      Total for all previous projects (new work, $14,007,192.66,
       and maintenance, $1,116,026.07) ____                      15, 123, 218. 73
   The expenditures have been $15,708,974.35.
   For further details see pages 1902 to 1906 of Annual Report for
1915,. and pages 1190-1194, 1196-1216, and 1220-1222, Annual Report
for 1929.
   Existing project.-This provides for a channel 9 feet deep at low
water from the mouth to Knoxville, Tenn., a distance of 647.7 miles,
to be obtained by the construction of low dams; provided, that under
the provisions of the Federal Water Power Act a high dam with
locks may be substituted for any two or more of the low dams and
built by private interests, States, or municipalities; and, provided
further, that in case high dams are built before the United States
shall have built the projected locks and low dams which are to be
replaced, the United States shall contribute to the cost of the sub-
stituted structures an amount equal to the estimated cost of the
works of navigation for which substitution is made.
   The Chief of Engineers was directed to ascertain and report to
Congress on the first day of the first regular session of the Seventy-
second Congress, advising the prospective cooperation offered by re-
sponsible interests, under the Federal Water Power Act, in the pro-
gram of construction recommended by the Chief of Engineers,
providing for the 9-foot project by means of high dams.
   The total number of low navigation dams now included in the
project is 27 (exclusive of those already built under former projects
and those eliminated by the construction of a high navigation-power
dam at the General Joe Wheeler site, mile 274.9).
   The following table contains information concerning various fea-
tures of the proposed locks and low dams and such existing locks
and dams as are included in this project:
                    ~'                       -1Location.                                                                                                                                Lock



                                                                                                                   !i
                                                                  Location
                                                                                                                                                               Pool el(evation
                                                                                                                                Dimensions                    above mnean sea
                                                                                                                                                                    leivel
           Name                                                                                                                                                                                         Per-    Year    Estimated                            O
                              Miles           Distance from nearest town, or mouth, of navi-                                          i                   I------                                       cent-                                                O
                                                                                                                                                                                   Character of foun- age of opened or actual cost
                                                                                                                                                                                                              to navi- of each lock
                              c
                              abouth                         gable tributary                                            Width Length
                                                                                                                               avail-
                                                                                                                                                                                        dation        comple- gation    and dam
                                                                                                                          of                     Lift     I Lower                                       tion
                                                                                                                        cham- able for
                                                                                                                                full
                                                                                                                                                                        Upper                                                                                O
                                                                                                                         ber   width
                                                                                                                                             I            I
                                                                                                                   -I            I




                                                                                                                         Feet        Feet        Feet          Feet      Feet
Aurora Landing __________    42. 2            11.1 miles above B irm ingham, K y ...--.......                              110         600        13           302       315     Hard gravel ......              (1)         (1)          $2,750,000. 00
White Oak Landing- ------ 83. 3               52.2 miles above Birmingham, Ky_........                                     110         600        13           315       328      ---  do ... .........          (1)         (1)           2, 735, 000.00    '
Perryville--_      ----   _ 135. 6            At Perryville, Tenn___                                                       110         600        15           328       343    ..... do ..        ..-------     (1)          (1)          2, 960, 000. 00
Wolf Island__               192. 0            2.5 miles above Savannah, Tenn_-.                                            110         600        10           343       353    ..... do ....--------            (1)          (1)          2,420, 000. 00
Big Bend Shoals___________ 204. 6             2.7 miles above Hamburg, Tenn -             --                               110         600        14           353       367     Rock-                           (1)         (1)           2, 620, 000. 00
Colbert Shoals Canal ...... 226. 6            0.9 mile above Riverton, Ala ___--      __                                   110         600        23. 6        367       390. 6----- do ---------                (1)         (1)          .3, 391, 000. 00
Head Colbert Shoals .______ 234. 6            8.8 miles above Riverton, Ala____ ________ __                                110         600        13. 4        390. 6    404           do ............
                                                                                                                                                                                    _---                         (1)         (1)           2, 665,000. 00
Dam No. 1 s8
           -                      256. 8      0.3 mile above railroad bridge at Florence, Ala_                              60         300        12. 1        404       416. 1  Limestone (Lau-                   100      1926            3989, 215.25
                                                                                                                                                                                     derdale chert).
Wilson Dam (Dam No. 2)__          259. 4      2.9 miles above Florence, Ala---                                             60        2 300       289           416. 1    505.1 --- do ---          ---------           99 1927           247, 737, 044. 27
General Joe Wheeler Dam           274. 9      18.4 miles above Florence, Ala                          --   _               60          360        49. 9        505. 1    555     Rock -                                10 -------         41, 355, 576. 20   M
 (Dam No. 3).3
Lock B       __________           285. 1      19.3 miles below Decatur, Ala __- _                                          110        600         10           520        530    ..... do ............           (1)         (1)          1,488,000. 00
Milton Bluff__                    287. 7      16.7 miles below Decatur, Ala ................                               110        600         11           530        541    .....-do ............           (1)         (1)          3, 195, 000.00
Indian Creek Bar________          3 21 . 2    16 .8 mile s a bo v e D ec atur , A la-- - . . . . . .. . . .                110        600          7           541        548    _-___do ............            (1)         (1)          2, 200, 000. 00
Beards Reef_                      355. 8      2.3 miles below Guntersville, Ala _____________                              110        600         16           548        564     - - do ............            (1)          (1)         2, 890, 000. 00
Mink Creek_                       3 7 4. 2    16 .1 miles a bo v e Gu nter s ville , A la .. . . . . . . . . . .           110         600        11           564        575    ..... do ............           (1)          (1)         2, 415, 000. 00
Bellefonte_______ ________        390. 6      32.5 miles above Gu ntersville, A la__ .........                             110         600         8           575        583    ..... do ............           (1)         (1)          2, 200, 000. 00
Widows Bar_                       407. 6      56.5 miles below Chattanooga, Tenn _.....                                  5 110       6 600         9.6        6583      5 592. 6 --- do ............             (5)         (5)         51, 595, 000. 00
                                                                                                                            60         267        36. 6        592. 6   6 629. 2       do ............            100       1913           7 236, 388. 87
Hales Bar Lock and Dam__          431. 1      32.9 miles below Chattanooga, Tenn ......                    .
                                                                                                                                                                                                                 (1)
Sherman Hill___-....____          468. 7      4.6 miles above Market Street Bridge, Chat-                                  110         600        11.8         629.2      641    ..... do ---------                          (1)          2, 300, 000. 00
                                                 tanooga, Tenn.
United States Quarry ______       486. 4      22.3 miles above Market Street Bridge, Chat-                                 110        600         12           641       653      ..... do ............          (1)         (1)           2, 300, 000. 00
                                                 tanooga, Tenn.
Sale Creek_____                   495. 0      30.7 miles above Market Street Bridge, Chat-                                110         600         10           653       663       -..     do ......             (1)         (1)           2, 130, 000. 00
                                                 tanooga, Tenn.
Kelly Shoals ___                  510. 8      46.7 miles above Market Street Bridge, Chat-                                110         600         10           663       673               do ...........        (1)         (1)           2, 130, 000. 00   o
                                                 tanooga, Tenn.
Watts Bar __                 529. 9           37.9 miles below Kingston, Tenn               ---------                     110
                                                                                                                          110
                                                                                                                                      600
                                                                                                                                      600
                                                                                                                                                  10
                                                                                                                                                  10
                                                                                                                                                               673
                                                                                                                                                               683
                                                                                                                                                                         683
                                                                                                                                                                         693
                                                                                                                                                                                   --.
                                                                                                                                                                                  .....
                                                                                                                                                                                           do ............
                                                                                                                                                                                           do ............
                                                                                                                                                                                                                 (1)         (1)           2, 130, 000. 00
                                                                                                                                                                                                                                           2, 130, 000. 00
White Creek Island .......   543. 9           23.9 miles below Kingston, Tenn__________                                                                                                                          (1)                ()
Half Moon Island   --------- 550. 6           17.2 miles below Kingston, Tenn..-.....                                     110         600         10           693       703      .....    do ... .. ..      .   (1)         (1)           2, 070, 000. 00
Caney Creek Island .------562. 9              4.9 miles below Kingston, Tenn-.......                                      110         600         10           703       713               do ............       (1)         (1)           2, 070, 000. 00
Seven Island Shoals .......  575. 1           7.3 miles above Kingston, Tenn-.......                                      110         600         10           713       723      ----     do ............       (1)         (1)           2, 070, 000. 00
Sweetwater Island ... -__    584. 3           7.2 miles below Loudon, Tenn -.........             -                       110         600         10           723       733       ---     do ............       (1)         (1)           2,070,000. 00
Rock Quarry Bar-----------         594.   3   2.8 miles above Loudon, Tenn....---------------               110   600   10   733   743    -,_do--- ---        (1)    (1)    2, 070, 000. 00
Sister Island Shoals---------      604.   6   13.1 miles above Loudon, Tenn--------------                   110   600   10   743   753        do-----------   (1)    (1)    2, 070, 000. 00
Coulter Shoals---.--------- .608.         6   17.1 miles above Loudon, Tenn...---------------110                  600   10   753   763   ---  do------------(1)       (1)   2, 070, 000. 00
Rogers Island....------------618.         1   29.6 miles below Knoxville, Tenn              ..------------- 110   600   10   763   773        do----------      )      )    2, 040, 000. 00
Georges Branch.__-- -.---          630.   6   17.1 miles below Knoxville, Tenn.........-------------        110   600   10   773   783   -    do              (1)    (1)    2, 040, 000. 00
Little River Shoals--------....... 635.   5   12.2 miles below Knoxville, Tenn---------                     110   600   10   783   793   -__do-(1)                    (1)   1, 960, 000. 00
Williams Island.----------- 638.          6   9.1 miles below Knoxville, Tenn          ..--------------     110   600   10   793   803    --   do              (1)    (1)   1, 960, 000. 00

    1 Proposed.dam, no work performed; estimated cost.
    2Flight of 2 locks, authorized under sec. 124, National Defense Act of June 3, 1916 (H. Doc. No. 1262, 64th Cong., 1st sess.).
    3 Will submerge existing Locks Nos. 1 and 2 of Muscle Shoals Canal, Locks A and B of Elk River Shoals Canal, and eliminate Milton Bluff, Indian Creek Bar, and Beards Reef
projects.
    4 Original contract price for lock 60 by 360 feet under construction. Dam under construction by Tennessee Valley Authority.
    5 Existing dam will be reconstructed to provide 9-foot depth and size of lock increased. Estimated cost shown is for reconstruction.
    6 Present elevation of dam (626.2) is increased 3 feet at present by flashboards. Modification to provide 9-foot instead of 6-foot depth will be required.
    7 Actual cost to United States of existing lock; cost to power company was about $6,686,700.
    8 Actual cost.




                                                                                                                                                                                              Ho

                                                                                                                                                                                              0!
902    REPORT OF    CHIEF OF ENGINEERS,    U.   S.   ARMY,   1934


   The extreme fluctuation in the stage of the river varies from about
49 to 55 feet below Riverton; from 30 to 53.4 feet between Riverton
and Colbert Shoals; from 30 to 33 feet between Colbert Shoals and
Florence; from 11 to 33 feet between Florence and Browns Island;
from 11 to 49 feet between Browns Island and Hales Bar; from
16 to 53 feet between Hales Bar and Chattanooga; from 36 to 53 feet
above Chattanooga.
   The estimated cost, exclusive of amounts expended on previous
projects, is $74,709,000 for new work and $40,000 annually for the
maintenance and operation of each lock and dam.
   The existing project was adopted by the River and Harbor Act of
July 3, 1930 (H. Doc. No. 328, 71st Cong., 2d sess.), which author-
ized the appropriation of $5,000,000 for the prosecution of work on
this project. The latest published maps are in the project document.
   Recommended modifications of project.-Under date of December
7, 1931, a report was transmitted to Congress reporting on the pro-
spective cooperation offered by responsible interests under the Fed-
eral Water Power Act in the program of construction recommended
by the Chief of Engineers providing for the 9-foot project on the
Tennessee River by means of high dams. In this report it is also
recommended that the appropriation of funds be authorized for the
construction of low navigation dams to provide 9-foot navigation
from head of Colbert Shoals to the Hales Bar Lock and Dam below
Chattanooga, at an estimated cost of approximately $22,500,000,
which is $17,500,000 in excess of the present authorized appropria-
tion (H. Doc. No. 131, 72d Cong., 1st sess.).
   Local cooperation.-An act of Congress of April 26, 1904 (as
amended by an act dated Jan. 7, 1905), authorized the construction
by private interests of the Hales Bar Lock and Dam, the .power
company doing the work being granted the use of the water power
produced by the dam for a period of 99 years. The terms of the
act require that this company purchase and deed to the United
States, free of cost and within 12 months after its passage, all lands
necessary to the successful construction and operation of the lock
and dam, including flowage rights and rights-of-way to and from
public highways; that the lock and dam be constructed and given
to the United States complete and free of cost, except that the
United States shall prepare the plans, supervise the construction,
and provide the lock gates and ironwork and machinery necessary to
operate the lock when completed, at its own expense, and that the
plans for the work be approved by the Secretary of War. The act
further requires that the contracting company shall furnish the
necessary electric current while its power plant is in operation to
move the gates and operate the lock and to light the United States
buildings and grounds free of cost to the United States; and that
nothing shall be done in the use of the water from the dam or other-
wise that shall interfere in any way with navigation.
   All the conditions imposed by the act have been complied with
by the power company except the transfer of flowage rights incident
to the construction of the dam. The Department has held that such
rights of flowage may be acquired and conveyed in the form of an
easement or servitude on the land affected by the work, and it is
understood that suits are pending between the power company and
landowners covering flowage rights.
        RIVERS AND   HARBORS-NASHVILLE,       TENN.,   DISTRICT    903
   The construction work of the power company has been completed
and the lock put in operation, but several leaks under the dam have
developed and final acceptance of the lock and dam by the United
States is being delayed until the result of the company's efforts to
stop them has been determined. The cost to the power company was
approximately $6,686,700, not including the power-house super-
structure, the hydraulic installation, the electric installation, or the
transmission lines.
   The River and Harbor Act of July 3, 1930, requires no local coop-
eration in the construction of the alternate system of low dams. It
does, however, provide that in case high dams are built before the
United States shall have built the projected locks and low dams
which are to be replaced, the United States shall contribute to the
cost of the substituted structures an amount equal to the estimated
cost of the works of navigation for which substitution is made.
   Terminal faoilities.-A full and complete report of terminals along
the Tennessee River in 1918 is contained in House Document No. 652,
Sixty-sixth Congress, second session. Additional data are also con-
tained in Transportation Series No. 2, 1929, Transportation in the
Mississippi and Ohio Valleys. Modern river terminals, municipally
owned, have been constructed at Chattanooga, Tenn., but the other
public terminals are mostly unimproved landings.
   The existing commerce is generally being handled at great disad-
vantage, due to lack of more suitable wharves, transfer facilities, and
warehouses, and this condition undoubtedly discourages the trans-
portation of freight by river.
   Operations and results during fiscal year-Above Chattanooga
 (188 miles).-The existing channel was maintained by dredging, dike
construction, and the removal of snags and other surface obstruc-
tions which had become a menace to navigation. Dredging was com-
pleted at Knoxville Shoals, McNutt Shoals, Lyons Shoals, Louisville
Bar, and at the Nashville, Chattanooga & St. Louis Railway in-
cline in the vicinity of Chattanooga, involving the removal of
20,711 cubic yards of sand, gravel, and rock, at a total cost of
$47,083.82.
   Dikes at McNutt Shoals and Russell Shoals were repaired. This
work involved the placing of 315 cubic yards of rock at a cost of
$307.97.
   As an aid to navigation during low-water stages, the system of
range boards and cross boards marking the navigable channel in this
section (188 miles) was maintained at a cost of $3,085.37.
   All of this work was done with Government plant and hired labor.
The total cost for this section was $60,990.48, all for maintenance.
   Chattanoogato Riverton (237.6 miles).-The existing channel was
maintained by dredging and dike construction. Dredging was com-
pleted at Flint River Bar, below Florence Bridge, Kogers Island,
and Colbert Shoals, mouth of Sequatchie River, and brought to 43
percent completion at Florence Bridge. A total of 35,871 cubic
yards of sand, gravel, and rock was dredged, at a cost of $33,408.67.
Repairs were made to dike at Larkins Towhead, involving the plac-
ing of 500 cubic yards of rock, at a cost of $1,892.96. Dike construc-
tion was carried on at Limestone Bar, 4,818.7 cubic yards of rock
being placed at a cost of $13,438.21. Channel markers were main-
904     REPORT   OF   CHIEF OF ENGINEERS, U.     S. ARMY,   1934

tained at a cost of $1,973.71, and snags and other obstructions were
removed from the navigable channel.
   A contract is now in force for the construction of a lock at the
site of the proposed General Joe Wheeler Dam (Dam No. 3). The
total contract price is $1,355,576.20, and the sum of $1,103,929.85 has
been paid the contractor to date. The contract has been brought to
approximately 86 percent completion.
   The total costs for this section were $1,091,369.54, of which
$1,025,168.37 was for new work and $66,201.17 for maintenance.
   Belowl Riverton (26.5 miles).-Dredging was completed at Bear
Creek Shoals, Indian Creek Shoals, Winns Bar, Wolf Island, Chalk
Bluff, Eagle Nest Island, and Beech River Shoals. A total of 132,868
cubic yards of sand and gravel was removed, at a cost of $57,668.03.
   Marking of the navigable channel in this section was continued, at
a cost of $1,006.22. Stream gaging in cooperation with the United
States Geological Survey was carried on at a cost of $1,200.
   All work in this section was done with Government plant and
hired labor. The total cost of work in this section was $59,874.25,
all of which was for maintenance.
   The total cost for the year for the entire river was $1,212,234.27, of
which $1,025,168.37 was for new work and $187,065.90 for mainte-
nance. The total expenditures were $1,332,109.34.
   Condition at end of fiscal year (previous projects)-Above Chatta-
nooga.-Under previous project the open-channel work for securing
a channel 150 feet wide and 3 feet deep at extreme low water was
about 58 percent completed. The minimum available depth in the
section above Chattanooga is about 1 foot at extreme low water. The
river is usually navigable for 2-foot draft from December 15 to
August 1, and for 3-foot draft from January 1 to June 1. Draft of
4 feet and over is occasionally practicable for short disconnected
periods, during high-water months, from January to April, inclusive.
When the United States Geological Survey gage at Loudon reads
3.4 feet, 2-foot navigation is practicable, and for each additional foot
of reading on this gage 1 additional foot of navigable water depth
is available.
   Chattanooga to Riverton.-Under previous projects, Hales Bar
Lock and Dam was completed and placed in operation November 1,
1913, providing 6-foot low-water navigation up to Chattanooga,
Tenn. (32.9 miles). Widows Bar Lock and Dam has been in opera-
tion since 1925. The minimum available depth between Hales Bar
and Widows Bar Dam is 4.5 feet.
   The limiting depth between Widows Bar Lock and Dam and the
head of Wilson Dam Pool (132.5 miles) is about 3 feet at 1931 low
water. The construction of Dam No. 2 (Wilson Dam), 2.9 miles
above the railroad bridge at Florence, Ala., submerged Locks Nos.
3 to 9, inclusive, of the Muscle Shoals Canal and provided a depth
of 9 feet for a distance of 14.7 miles. Between Wilson Dam and
Colbert Shoals Canal 4-feet minimum depth is available over miter
sills at Riverton Lock, 6.25 feet; and in the open river over Colbert-
and Bee Tree Shoals, 1 foot.
        RIVERS AND     HARBORS-NASHIVILLE,           TENN.,      DISTRICT       905

   Dae No. 2 to Florence Bridge, Ala. (Darm No. 1).-The project
is considered completed at a saving of $610,784.75 under the esti-
mated cost. The present limiting depth between Dam No. 1 and
Dam No. 2 is 7 feet, which is ample for existing and reasonably
prospective commerce. This depth may be increased to 9.5 feet
when needs of navigation require it.
   Below Riverton.-Additional dredging to maintain a navigable
depth of 5 feet during the next fiscal year is necessary at McCullochs
Bar, Hurricane Islands, Rockport Bar, mouth of Duck River, Kellys
Island, Double Island, Diamond Island Shoals, and Big Bend Shoals.
A navigable depth of 5 feet, available when the Johnsonville gage
reads zero and the lower gage at Riverton Lock reads 7 feet, is
ordinarily available throughout the year, except at Indian Creek
and Big Bend Shoals, where on account of rock bottom the navigable
depth is restricted to 41/2 feet. From December 15 to August 15,
6-foot navigable depth or greater is available.
   Nine-foot project.-Preliminary investigations were carried on
until August 1, 1933, on which date the Chattanooga office was
abolished and no further work was done by this district; the work in
question having been transferred to the Tennessee Valley Authority.
   The total cost of work since the project was modified in 1930 has
been $2,755,172.87, of which $1,623,632.22 was for new work and
$1,131,540.65 for maintenance. The expenditures were $2,657,613.39.
   Proposed operations.-The balance unexpended, including accounts
receivable at the end of the year, and the sum of $106,500 allotted
July 2, 1934, will be applied as follows:
New work:
   Accounts payable June 30, 1934 _______________                        $64, 50. 81
    Completion of construction of lock at General Joe Wheeler
     Dam (Dam No. 3), by contract, July 1, 1934-June 30, 1935__          148, 213. 91

Maintenance:
   Accounts payable June 30, 1934_                       ---         -    33, 708. 87

    Above Riverton :
        Dredging, repair of dikes, dike construction, snagging, and
          the sweeping of dredged channel in rock cuts, July 1,
          1934-June 30, 1935__------                                      91, 726. 93
        Shoal surveys, Aug. 1-Oct. 31, 1934__                              5, 000. 00
        Maintenance of channel markers, July 1-Oct. 31, 1934_____          4, 000. 00
    Below Riverton :
        Maintaining channel by dredging, July 1-Dec. 31, 1934,
          and May 1-June 30, 1935                                         61, 800. 00
        Shoal surveys, Aug. 1-Oct. 31, 1934-----------------               5, 000. 00
        Installation of channel markers, Sept. 1-Nov. 30, 1934 ...         3, 000. 00
        Stream gaging in cooperation with U. S. Geological Survey,
          July -1, 1934-June 30, 1935 ---------    ------                   1, 200. 00
            Total for maintenance--                             -_
                                                ____--------_____        171, 726. 93

            Grand total__------------------- --------------------        418, 154.52
It is proposed to do the following additional work at General Joe
Wheeler Dam (Dam No. 3), funds for which will be advanced to the
War Department by the Tennessee Valley Authority, based on
monthly estimates of proposed expenditures:
906       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                   1934

New work :
   Construct bulkhead section of dam between the lock now under
     construction and the right bank abutment-         ________ _ $242, 000
   Remove, dismantle, transport to, and install for temporary use at
     the upper end of the lock now under construction the lower lock
     gate at Lock 3, Muscle Shoals Canal, which was submerged as
     the result of the construction of Wilson Dam (Dam No. 2) __     3, 500
   Install necessary mechanism for operating the temporary lock
        gate--_---                                                             3, 900
      Place necessary concrete for the temporary upper miter sill in
        excess of the amount required for the permanent upper sill of
        the lock now under construction ------------------                     8, 600
      Dredging upstream from the lock necessary to provide a navigable
        channel for transporting sand, gravel, and other materials used
        in the construction of the dam_ _-___________- _                      16, 000
      Dredging and dike construction necessary for providing navigation
        at the project site during construction of the dam___-                22, 000
      Purchase and installation of lock-operating machinery and the
        provision of power-house and electrical facilities for the lock
        at General Joe Wheeler Dam (Dam No. 3), by contract, July 1,
        1934-June 30, 1935                                            --     125, 000

          Total_ _- -        ____           ____------                       421,000

  The additional sum of $346,000 can be profitably expended during
the fiscal year 1936 as follows:
New Work: Completion of the project at General Joe Wheeler Dam
   (Dam No. 3), including the purchase of the reservation grounds
  and the construction of the necessary buildings, roadways, etc., July
  1, 1935-June 30, 1936 ----------------------     ___                  $96, 000
Maintenance (by Government plant and hired labor) :
    Above Riverton :
        Dredging, repair of dikes, removal of surface obstructions,
          and the sweeping of dredged channels, July 1, 1935-June
          30, 1936 ---------------------------------------------- 145,000
        Maintenance of channel markers, July 1-Oct. 31, 1935 ...---     5, 000
    Below Riverton:
        Dredging, July 1-Dec. 31, 1935, and May 1-June 30, 1936...... 100, 000

             Total for maintenance --_____------------     --------          250, 000

             Total for all work_-----------------------                      346, 000
                              Cost and finanial summary
Cost of new work to June 30, 1934----------------------- $15, 630, 824. 88
Cost; of maintenance to June 30, 1934----------------------2, 247, 566. 72
      Total cost of permanent work to June 30, 1934 ------       _    17, 878, 391. 60
Value of plant, materials, etc., on hand June 30, 1934    ---------       497, 539. 53
      Net total cost to June 30, 1934----------------------18, 375, 931. 13
Plus accounts receivable June 30, 1934-----------------------   88, 870. 29

      Gross total costs to June 30, 1934                      1----------------
                                                               8, 464, 801. 42
Minus accounts payable June 30, 1934 ------------------------       98, 213. 68

     Net total expenditures__
                           -----------------------------    18, 366. 587. 74
Unexpended balance June 30, 1934_--------------------------     222, 784. 23
        Total amount appropriated to June 30, 1934-----------18, 589, 371.97
            RIVERS AND HARBORS-NASHVILLE,                                     TENN.,              DISTRICT               907

   Fiscal year ending June 30               1930             1931            1932                     1933            1934


Cost of new work__   _-_ -        _       $71. 211. 63     $46, 906. 04   $116, 647. 50         $434, 910. 31    $1, 025, 168. 37
Cost of maintenance__-_ -_            -178,    741. 42     458, 148. 59    268, 094. 93          221, 181. 23        187, 065. 90

      Total cost_---------------249, 953. 05               505, 054. 63    384, 742. 43          656, 091. 54     1, 212, 234. 27

Total expended........---------------431, 424. 53          436, 742. 30    360, 253. 44          552, 080. 85     1, 332, 109. 34

Allotted_--------------       __----.. 402, 800. 00        472, 233. 00   -40, 000. 00         1, 665,990. 05       409, 900. 76


Balance unexpended July 1, 1933-----_________-----------------        $1, 144, 992. 81
Amount allotted from War Department Appropria-
  tion Act approved July 14, 1932_____________--         $67, 002. 45
Amount allotted from Emergency Relief and Con-
  struction Act approved July 21, 1932__________          130, 000.00
Amount allotted from War Department Appropria-
  tion Act approved Mar. 4, 1933 ________------230, 000. 00
                                                                          427, 002. 45
       Amount to be accounted for______________
                                   ------                                                                    1, 571, 995. 26
Deductions on account of revocation of impounded funds                                         ----              17, 101.69

         Net amount to be accounted for__________                              _                             1, 554, 893. 57
Gross amount expended_________________________                               $1, 564, 335. 30
Less-
     Reimbursements collected-.  ----                       $188, 128. 15
     Receipts from sales _________                            44, 097. 81
                                                                                    232, 225. 96
                                                                                                             1, 332, 109. 34

      Balance unexpended June 30, 1934___                                                                        222, 784. 2-3
Outstanding liabilities June 30, 1934_____________                                   99, 976. 34
Amount covered by uncompleted contracts ----                                        148, 213. 91
                                                                                                                 248, 190. 25
      Balance available June 30, 1934-----------------------                                                    -25, 406. 02
Accounts receivable June 30, 1934     -        --                                                                 88, 870. 29

         Unobligated balance available June 30, 1934-------------                                                 63, 464. 27
Amount (estimated) required to be appropriated for completion
   of existing project 1 2-                                                               --                    262, 500. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1936-
   For new work -----------------------------------------                                                         96, 000. 00
   For maintenance 1-----------------------------------------                                                    250, 000. 00
         Total '                                                                                                 346, 000. 00

4. OPERATING AND CARE OF CANALS AND LOCKS AND DAMS ON
                    TENNESSEE RIVER

   The improvement for which report is made under this caption
forms part of the project for the Tennessee River. See pages 898
to 907, where general information regarding the improvement can be
found.
   The completed canals, locks, and dams, have been operated and
maintained under the permanent indefinite appropriations as
follows :
  ' Exclusive
   " Estimated
                 of available funds.
                   cost   of 9-foot        project,      $74,709,000;     expenditures                limited by      law to
$5.000.000.
908          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                             1934

  Hales Bar Lock and Dam, since November 1, 1913; Widows Bar
Lock and Dam, since October 1, 1925; Muscle Shoals Canal, since
1890; Lock No. 2 (Wilson Dam), since June 1927; Lock and Dam
No. 1, since March 1, 1926; and Colbert Shoals Canal, since
November 1911.
  Operations and results during fiscal year.-The locks were oper-
ated, dwellings, grounds, locks, and equipment were cared for. All
work was done with Government plant and hired labor. The costs
for the year were $64,575.91. The total expenditures were $58,899.
   Condition at the end of the fiscal year.-For condition of canal-
ization, see page 904 for the section Chattanooga to Riverton. The
total costs to the end of the fiscal year were $2,782,645.91. The total
expenditures were $2,798,773.34.
  Proposed operations.-The locks and dams will be operated and
maintained under allotments from appropriations made available for
such purposes.
                                    Cost and financial summary

Cost of maintenance to June 30, 1934______________________ $2, 782, 645. 91
Value of plant, materials, etc., on hand June 30, 1934 ......... 24, 311. 67

           Net total cost to June 30, 1934_______________________                                   2, 806, 957. 58
Plus accounts receivable June 30, 1934________________________                                                 145. 04

     Gross total costs to June 30, 1934________ ______________                                      2, 807, 102. 62
Minus accounts payable June 30, 1934_______________________                                              8. 329. 28

     Net total expenditures_--------------------------_                                             2, 798, 773. 34
Unexpended balance June 30, 1934___________________________                                              6, 875. 41

           Total amount appropriated to June 30, 1934______________                                 2. 805, 648. 75

           Fiscal year ending June 30         1930          1931           1932                1933            1934


Cost of new work------------------------------------
Cost of maintenance-_----------------- $82, 001. 36 $84, 702. 60        $78, 647. 87        $63, 609. 63     $64, 575. 91
Total expended-----------------------       80, 296. 27   78, 554. 09    85, 830. 22         83, 235. 29       58, 899. 00
Allotted      --------------------------- 79, 123. 00     90, 000. 00    69, 000. 00         83, 095. 59      63, 230. 42

Balance unexpended July 1, 1933 ------------    _____      -______ $2, 543. 99
Amount allotted from permanent indefinite appropriation, sec. 6,
River and Harbor Act, Mar. 3, 1909 ___        -__6______________ 5, 866. 36
     Amount to be accounted for____          __-----------------------                                     68, 410. 35
Deductioss on account of revocation of impounded balances- ---                                 _            2, 635. 94
      Net amount to be accounted for .. ___._______. __ ______                                             65, 774. 41
Gross amount expended------------------------         $65, 714. 43
Less reimbursements collected__________-__ __           6, 815. 43
                                                                                                           58, 899. 00
       Balance unexpended June 30, 1934_____-----       -_____                                              6, 875. 41
Outstanding liabilities June 30, 1934_--__..______.._____.                                                 9, 224. 80
      Balance available June 30, 1934.__..._____   ___-__-____                                             -2, 349. 39
Accounts receivable June 30, 1934 ______-__.  ___ _________                                                   145.04
           Unobligated balahce available June 30, 1934--2,__                           --                   2, 204. 35
Amount allotted for fiscal year 1935__.                                                                    64, 500. 00
            Balance available for fiscal year _______. _ _                                                  62, 295. 65
        RIVERS AND HARBORS-NASHVILLE,          TENN.,   DISTRICT    909
       5. TENNESSEE RIVER, DAM NO. 2, MUSCLE SHOALS, ALA.

  Location.-See corresponding paragraph under "4. Improvement
of Tennessee River ", page 898.
    The section of river covered by this report known as the " Muscle
Shoals section " flows in a westerly direction through the northern
part of Alabama from the head of Browns Island (170.9 miles below
Chattanooga, Tenn.) to Florence, Ala. (256.5 miles above the mouth
of the river), a distance of 36.7 miles. (See U. S. Geological Survey
topographical map of Muscle Shoals and Rogersville, Ala., quad-
rangles.)
   Existing project.-This provides for the construction of two locks,
a dam, and a power house 2.9 miles above the railroad bridge at
Florence, Ala., securing a least depth of 9.5 feet at extreme low water
for a distance of 14.7 miles, and for the generation of electrical
power for the production of nitrates or other products needed for
munitions of war and useful in the manufacture of fertilizers and
other useful products. The pool above the dam submerges Muscle
Shoals Canal Locks Nos. 3 to 9, inclusive, constructed under a former
project.
   The estimate of cost of new work, revised in 1923, was $45,800,000
for completion of locks, dam, and power house, and the installation
of eight main units of a total capacity of 230,000 kilovolt-amperes.
In 1925, $2,000,000 was added to this estimate for the purchase of
transformers and the construction of high-tension switch yards, a
utility building, etc., making the total estimated cost $47,800,000.
   Preliminary studies of plans, etc., were begun in the fiscal year
1918. Preliminary work, such as the construction of camp, roads,
railroads, and coffer works, together with the purchase of equipment
and supplies, was begun in the summer of 1918 and was well under
way when work was suspended by order of the War Industries
Board on August 21. 1918, and was not resumed until November 9,
1918. It was not until the beginning of the spring of 1919 that a
sufficient force could be gathered together to resume operations satis-
factorily. Construction operations on the lock and dam and power
house were continued at full speed until about April 15, 1921, when,
due to shortage of funds, work was gradually shut down, and on
June 30, 1921, it was practically on a maintenance basis. Construc-
tion operations on a small scale were resumed on July 15, 1922, with
the balance of the funds allotted from the National Defense Act of
June 3, 1916. Under date of August 26, 1922, an allotment of $600,-
000 was made by the President from the balance of the funds pro-
vided by the National Defense Act, which enabled the work to be
pushed more vigorously, and on October 1, 1922, when the funds
appropriated by the act of June 30, 1922, became available, work
was fully resumed. The work was carried on vigorously until the
dam was completed and ready for operation.
   Although there are at present only 8 generating units installed
at Wilson Dam, with a combined capacity of 260,000 horsepower,
there is a provision for ultimate installation of 18 units totaling
610,000 horsepower.
   The following data relate to the new locks and the dam, similar
data for the old locks being given on pages 1219, 1221, and 1222 of
the Annual Report for 1917:
910      REPORT    OF CHIEF OF ENGINEERS,         U.   S.   ARMY,   19934

  Designation: Wilson Dam (No. 2).
  Location: 2.9 miles above Florence, Ala., and 259.4 miles above the mouth
of the river.
  Length of locks available for full width: lower, 300 feet; upper, 297.5 feet.
  Width: 60 feet.
  Total lift of locks: 89 feet above lower pool, or about 96 feet above extreme
low water in the open river.
  Depth on miter sills: 9.4 feet on lower sill below normal pool of Dam No. 1.
Depth on intermediate sill, 8.9 feet; depth on upper sill, 12 feet below normal
pool of Dam No. 2.
  Character of foundation : Limestone (Lauderdale chert).
  Kind of dam: Fixed, with moyvable crest gates 18 feet high.
  Type of construction: Concrete.
  Percentage of completion: 100.
  The ordinary and extreme fluctuations in the river are about 11
feet and about 31 feet, respectively.
  The existing project for the Wilson Dam (No. 2) and appurte-
nances was adopted by letter of the President, dated February 23,
1918, under authority of section 124 of the National Defense Act of
June 3, 1916 (plans of the Wilson Dam (No. 2), and appurtenances
in H. Doc. No. 1262, 64th Cong., 1st sess.). For map see House
Document No. 1262, Sixty-fourth Congress, first session.
   Terminal faeilities.-None.
   Operations and results during fsseal year.-From July 1, 1933,
until August 15, 1933, a small force was employed cleaning up the
south side preparatory to transferring to the Tennessee Valley Au-
thority. The cost of this work was $697.34. The total costs for the
period, including plant and material turned over to the Tennessee
Valley Authority without adjustment of funds, amounted to $75,-
487.31 for new work. The total expenditures were $2,287.03.
   Condition at the end of fseal year.-This project has been ad-
ministered by the Tennessee Valley Authority since August 15, 1933.
The total costs to date under the existing project are $47,026,235.67,
of which $46,666,643.15 was for new work and $359,592.52 for mainte-
nance. The total expenditures were $46,973,535.64.
   Proposed operations.-Underthe provisions of the Tennessee Val-
ley Authority Act of 1933, the Tennessee Valley Authority assumed
control of and responsibility for the properties at Muscle Shoals on
June 16, 1933. The physical transfer of this improvement from the
War Department to the Tennessee Valley Authority was made on
September 1, 1933. The balance unexpended at the end of the year,
$12,048.63, is available for revocation.
                           Cost and financial summary

Cost of new work to June 30, 1934-----------------_                 $46, 666, 643. 15
                                                    --
Cost of maintenance to June 30, 1934________________________             359, 592. 52

      Total cost of permanent work to June 30, 1934 ________        47, 026, 235. 67
Value of plant, materials, etc., on hand June 30, 1934_...... __      -52, 700. 03

      Net total cost to June 30, 1934---    _________________       46, 973, 535. 64

Net total expenditures_____----------                                46, 973, 535. 64
Unexpended balance June 30, 1934                                          12, 048. 63
       Total amount appropriated to June 30, 1934------------ 46, 985, 584. 27
             RIVERS AND HARBORS--NASHVILLE,                                          TENN., DISTRICT                    911

    Fiscal year ending June 30                     1930           1931              1932             1933            1934


Cost of new work- ......... ..                   $18, 537. 65   $26, 886. 01      $23, 005.64      $13, 396. 58     $75, 487. 31
                       ..
Cost of maintenance-----___ __--
Total expended          _----------------         22, 039. 34    11, 079. 59       14, 801. 60      13, 594.49        2, 287. 03
Allotted ....        -----
                    ...--------      -----------------..
                                      .....           _                   ... -750, 000. 00
                                                                         _-                        -1, 349. 36        -110. 64


                                   ----
Balance unexpended July 1, 1933_________              __-----$14,                                                    446. 30
Deductions on account of revocation of impounded funds----------                                                     110. 64

       Net amount to be accounted for                                                                                335. 66
                                                                                                                  1_______-----------14,
Gross amount expended_--------- -----                                                            $7, 725.21
Less--
    Reimbursements collected ---------                                            $369. 76
    Receipts from sales ________________-                                      _ 5, 068.42
                                                                                                  5, 438. 18
                                                                                                                   2,287. 03
          Balance unexpended June 30, 1934_____________________                                                   12, 048. 63
6. OPERATION, MAINTENANCE, AND REPAIR OF DAM NO. 2, TENNES-
   SEE RIVER, INCLUDING THE HYDROELECTRICAL                                                        DEVELOPMENT

   The improvement for which report ismade under this caption
forms part of the project for the improvement of the Tennessee
River, Browns Island to Florence, Ala. (See pp. 898 to 907, where
general information regarding the project can be, found.) The dam
and hydroelectrical development have been operated and maintained
by the War Department under appropriations provided by Congress
since April 1, 1926, to August 15, 1933, on which date this project
was transferred to the Tennessee Valley Authority.
   Operations and results duriny fiscal year.-The hydroelectrical
development was operated and maintained in excellent condition to
August 15, 1933, on which date it was transferred to the Tennessee
Valley Authority. Costs for period, $136,015.92, all for maintenance.
Expenditures, $20,614.35.
   Condition at end of fiscal year.-This development has been trans-
ferred to the Tennessee Valley Authority. The total expenditures
from the appropriation for maintenance, operation, and repair from
April 1, 1926, to August 15, 1933, amounted to $1,711,941.08.
   Proposed operations.-Under the provisions of the Tennessee
Valley Authority Act of 1933 the Tennessee Valley Authority
assumed control of and responsibility for the properties at Muscle
Shoals, on June 16, 1933. The physical transfer of this improvement
from the War Department to the Tennessee Valley Authority was
made on September 1, 1933. The balance unexpended at the end
of the year is available for revocation.
         91536---ENG 1934                   58
912        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                             1934

                                    Cost and financial summary
                                           --
Cost of maintenance to June 30, 1934_ ______-_________------      $1, 711, 941. 08
Value of plant, materials, etc., on hand June 30, 1934-----------       -- 284. 60

       Net total cost to June 30, 1934----------___-_____--                                          1, 711, 656. 48
Plus accounts receivable June 30, 1934-._________________                                       -            284. 60

        Gross total costs to June 30, 1934 ____--                    ______---
                                                                        -     -         -            1, 711, 941. 08
Net total expenditures----------------------------------                                             1, 711, 941. 08
Unexpended balance June 30, 1934-  --- --       -------                                                 222, 871. 30

        Total amount appropriated to June 30, 1934___--                        ________              1, 934, 812. 38

        Fiscal year ending June 30            1930            1931          1932               1933           1934

Cost of new work------------------------
Cost of maintenance-----------------$208, 437.81 $236, 247. 81 $244, 993.73 $206, 624. 11                  $136, 015.92
Total expended___---------------------- 232,460. 57       254, 394. 45   247, 561. 36       203,483. 99      20, 614. 35
Allotted---------- ------    -----------   228, 522. 72   193, 236. 93 -43, 634. 59         422, 929.53     -10, 687. 81


Balance unexpended July 1, 1933    --------------------------  $254, 173.46
Deductions on account of revocation of allotment---------------10, 687. 81
       Net amount to be accounted for------------------------                                          243, 485. 65
Gross amount expended-_                                       $51, 046. 17
Less :
    Reimbursements collected-----              $17, 622. 74
    Receipts from sales-----------____           12, 809. 08
                                                               30, 431. 82
                                                                                                          20, 614. 35

        Balance unexpended June 30, 1934 ____________---___                             ___-           222, 871. 30

  7. EXAMINATIONS,                 SURVEYS, AND CONTINGENCIES                                  (GENERAL)

  The total cost during the year. was $140,560.92. The total expendi-
tures were $164,672.15.
  The balance unexpended June 30, 1934, together with accounts
receivable and allotment made during July 1934, will be applied as
needed during the fiscal year 1935 to payment of expenses to be in-
curred in connection with the above items. The additional sum of
$50,000 can be profitably expended during the fiscal year ending
June 30, 1936.
                        Cost and financial summary

Cost of maintenance to June 30, 1934       _____________    ____ $557, 562. 82
Value of plant, materials, etc., on hand June 30, 1934__--------- --    13.87
      Net total cost to June 30, 1934----------------------_ --                                        557, 548. 95
Plus accounts receivable June 30, 1934________________________                                           3, 239. 51
     Gross total costs to June 30, 1934________.__________-                                            560, 788. 46
Minus accounts payable June 30, 1934_________________________                                            2, 978. 48
     Net total expenditures ________-__-__                --                                           557, 809. 98
Unexpended balance June 30, 1934___________________________                                             40, 832. 50
        Total amount appropriated to June 30, 1934 ------                                           - 598, 642. 48
              RIVERS        AND    HARBORS-NASHVILLE,                         TENN.,            DISTRICT                   913

    Fiscal year ending June 30            1930            1931               1932                1933                1934


Cost of new work ..........
Cost of maintenance __----------        $14, 501. 83   ,$98, 273. 24     $102, 635. 73        $183, 423. 81       $140, 560. 92
Total expended--------------28,             704. 83      81, 785. 93      115, 614. 68         163, 484. 18        164, 672. 15
Allotted       ---------------.          30, 000. 00    154, 000. 00        19, 900. 00        308, 156. 61          54, 085. 87


Balance unexpended July 1, 1933------------------------------$151, 418. 78
Amount allotted from War Department Appropriation Act ap-
proved Mar. 4, 1933---------------60.                             000. 00

      Amount to be accounted for---------------------------                                                     211, 418. 78
Deductions on account of revocation of impounded funds .----                                     __               5, 914. 13

      Net amount to be accounted for ------------------------ 205, 504. 65
Gross amount expended ---    ------------------- $212, 222. 991
Less-
    Reimbursements collected----------   $28, 555. 62
    Receipts from sales-------- --------  18, 995. 22
                                                                                            47, 550. 84
                                                                                                                164, 672. 15
      Balance unexpended June 30, 1934                                                                            0, 832. 50
                                                                                                                 4-----------------------
Outstanding liabilities June 30, 1934---------------------------                                                  4, 104. 82
     Balance available June 30, 1934---   ---------------------                                                  36, 727. 68
Accounts receivable June 30, 1934 ----------------------------                                                    3, 239. 51

           Unobligated balance available June 30, 1934--------------                                            39, 967. 19
Amount that can be profitably expended in fiscal year ending June
                            - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - -
30, 1936, for maintenance 1                                                                                     50, 000. 00
                  8. Other projects for whick no estimates are submitted
                      [Commercial statistics for these projects are given in pt. 2 of report]


                                                          For last      Cost and expenditures to
                                                            full              June 30, 1934                       Estimated
                                                          report,                                                amount re-
                     Name of project                        see
                                                          annual                                                  quired to
                                                          report         New work            Maintenance          complete
                                                           for-


1. Cumberland River, Tenn. and Ky., above
     Nashville 1                               2            1933       $4, 092, 044.   37     $106,   069. 57   $6, 849,   000.00
2. French Broad and Little Pigeon Rivers, Tenn. _           1931           249, 604.   80       33,   554. 02       533,   000.00
3. Hiwassee River, Tenn 3-             - -                  1923           113, 311.   26        9,   754. 45        83,   000.00
4. Clinch River, Tenn. and Va 2     -                       1923            53, 949.   19        7,   873. 24       677,   000.00

  1 Inactive pending action on modifications of project recommended in Rivers and Harbors Committee
Doc. No. 6, 69th Cong., 1st sess.
  2 Channels adequate for existing commerce. Abandonment recommended in H. Docs. Nos. 428 and
489, 64th Cong.. 1st sess.
   3 Recommended for abandonment in H. Doc. No. 467, 69th Cong., 1st sess.


   1 Exclusive of available funds.
914           REPORT :OF           CHIEF     :OF    ENGINEERS,          U.   S. ARMY,    1934

Status of reports called for by river and harbor acts and committee resolutions


        Locality                Authorization act        TranCongress         Doc. No.     Recommenda-
                                                          to Congress                          tion

Cataco Creek and its         Flood Control         Act
branches,   Morgan            Apr. 15, 1932.
  County, Ala. (prelim-
inary examination for
  flood control).
Flint   Creek   and     its __-__do_    --                       -
  branches,         Morgan
  County, Ala. (prelim-
  inary examination for
  flood control).
Flint River, Ala. and        -. -do..
  Tenn.     (preliminary
  examination for flood
  control).
Paint Rock River, Jack-      Flood Control         Act
  son County, Ala. (pre-      June 13, 1934.
liminary examination
for flood control).


                                             OHIO RIVER
   For the actual construction of the new locks and dams and the
operation and care of the completed structures and open-channel
work the river is divided into four sections under the immediate
supervision and direction of district engineers at Pittsburgh, Hunt-
ington, Cincinnati, and Louisville.
  The Pittsburgh section extends from the head of the river at Pitts-
burgh, Pa., to about mile 109 between Captina Island and Powhatan
Point, a distance of 109 miles, and includes Emsworth and Dashields
Locks and Dams and Dams Nos. 4 to 13, inclusive; the Huntington
section extends from about mile 109 between Captina Island and
Powhatan Point to about mile 317.5, just below the mouth of the
Big Sandy River, Ky., a distance of about 208.5 miles, and includes:
Dams Nos. 14 to 28, inclusive; the Cincinnati section exends from
about mile 317.5 just below the mouth of the Big Sandy River, Ky.,
to about mile 556.2, just above Madison, Ind., a distance of about
238.7 miles, and includes Dams Nos. 29 to 39, inclusive; the Louis-
ville section extends from a point 50 miles above Louisville and 1.5
miles above Madison, Ind., to Mound City, Ill., a distance of 417.2
miles, and includes Dams Nos. 41 (with the Louisville & Portland
Canal) to 54.
   District engineers: At Pittsburgh, Pa., Maj. Wilhelm D. Styer,
Corps of Engineers; Huntington, W. Va., Maj. Fred W. Herman,
Corps of Engineers; Cincinnati, Ohio, Lt. Col. Charles L. Hall,
Corps of Engineers; Louisville, Ky., Lt. Col. W. A. Johnson, Corps
of Engineers, to November 15, 1933, Capt. T. F. Kern, Corps of En-
gineers, acting district engineer, November 16 to November 27, 1933,
and Lt. Col. Gilbert Van B. Wilkes, Corps of Engineers, since that
date.
   Division engineer: Lt. Col. R. C. Moore, Corps of Engineers, act-
ing division engineer to July 28, 1933; Col. George R. Spalding,
Corps of Engineers, July 29 to November 27, 1933; Lt. Col. E. L.
Daley, Corps of Engineers, November 28 to November 30, 1933; and
Lt. Col. R. G. Powell, Corps of Engineers, since that date.
                  RIVERS AND      HARBORS-OHIO       RIVER                 915
                                 IMPROVEMENT8

                                  Page                                     Page
1. Construction of locks and             3. Open-channel   work,    Ohio
     dams, Ohio River _______      915        River__________________      927
2. Operating and care of locks           4. Operating snag boats on the
     and dams, Ohio River____      925       Ohio River below the Penn-
                                              sylvania State line-------   934
    1. CONSTRUCTION OF LOCKS AND DAMS ON THE OHIO RIVER

   Location.-The Ohio River is formed by the junction of the Alle-
gheny and Monongahela Rivers and empties into the Mississippi
River at Cairo, 111. The total length of the river is 981 miles. For
description of the river see page 1227, Annual Report for 1932.
   Previous projects.-The first lock and dam on the Ohio River was
provided by act of March 3, 1879. The construction of dams was
provided for by river and harbor acts, as follows: Dam No. 6, Sep-
tember 19, 1890; Dams Nos. 2, 3, 4, and 5, June 3, 1896; Nos. 13 and
18, March 3, 1899; Nos. 8, 11, 19, and 37, June 13, 1902; No. 26,
March 2, 1907. The cost and expenditures on original and subse-
quent projects prior to commencement of operations under the exist-
ing project, adopted in 1910, including amount expended for pur-
chase, etc., of Louisville and Portland Canal, were $17,657,273.78.
For further details see page 1907 of Annual Report for 1915.
   ELm'sting project.-This provides for the improvement of the en-
tire river by the construction of locks and dams to provide a channel
(depth of 9 feet and for the widening of the Louisville and Portland
Canal at Louisville, Ky. The project provides for one lock with
usable dimensions of 110 by 600 feet at each dam, and in addition
thereto second locks at the Emsworth, Dashields, Montgomery Island,
and Dam No. 41, with usable dimensions of 56 by 360 feet. Except
at Emsworth, Dashields, and Montgomery Island, all the dams are
of the movable type, with navigable passes varying in width from
600 to 1,248 feet. In addition to the navigable pass, each dam, ex-
cept the fixed dams, is provided with one or more regulating weirs.
At Dam No. 41 a canal (Louisville and Portland) extends along
the left bank 2 miles long, with locks at the lower end.
   The estimate of cost of new work revised in 1934, including ex-
penditures on previous projects prior to adoption of the 9-foot
project in 1910, but exclusive of the Gallipolis locks and dam
reported under the Kanawha River project, is $125,500,000.
   The project was adopted by the River and Harbor Act of June
25, 1910 (H. Doc. No. 492, 60th Cong., 1st sess.), which provided for
the construction of 54 locks with movable dams and for the widen-
ing of the Louisville and Portland Canal to 170 feet and the con-
struction of a new lock at the lower end. The act also granted
,discretionary authority to the Secretary of War to make such modi-
fications in the project as appeared advisable. The River and Har-
bor Act approved July 18, 1918, provided for the elimination of locks
and dams in the lower river where the project depth of 9 feet could
be satisfactorily maintained by open channel work (H. Doc. No.
1695, 64th Cong., 2d sess.).
916    REPORT   OF CHIEF OF ENGINEERS,    U.   S. ARMY,   1934


   Under the authority granted in the River and Harbor Act of
1.910 the Louisville and Portland Canal has been widened to 200
feet; Dams Nos. 40 and 42 have been eliminated; Locks and Dams
Nos. 1 and 2 replaced by the Emsworth Lock and Dam; Lock and
Dam No. 3 replaced by the Dashields Lock and Dam; and the
Montgomery Lock and Dam, now under construction, will replace
Locks and Dams Nos. 4, 5, and 6.
   The following table contains information concerning various fea-
tures of the locks and dams included in the existing project:
                                                                                                                   Lock
                               Location
                                                                                      Dimensions                Depth on miter                                                                            Per   Year
                                                                                                                     sills                                                                                                               Estimated or
                                                                                                                                                                                                         cent- opened                     actual cost
No.                                                                                                                                                                              Character of dam         age    to
                                                                      i
                                                                      _II                                   i
                                                                                                                                                                                   foundation            comI1- navi-                     of each lock
                                                                                 Greatest                                                    Character of                                                                                  and dam 1
                                                                           Width                                                             foundation                                                 pleted gation
      Miles                                                                       length
      below      Distance from nearest town or mouth of                     of
                                                                           cham- available         Lift         Upper I Lower
      Pitts-               navigable tributary                                   for full
      burgh                                                                 ber   width
                                                                      -I                                                                                                                                        ----..---- ----
                                                                                                                                                                                                        - .........           -
                                                                                                                                                                                                                             -----   I   ---


                                                                               Feet      Feet      Feet          Feet      Feet
       _____
        -_      Replaced ......         ...-----------                                                                                                                                                                                        $870,034.01
1
         6.1    Emsworth, Pa ------..-------------------
                                                                           {    11        600       13.0          13. 0   2 10. 9      R ock ..     -............          SRock        (114   feet);         100            1921            3, 082, 743. 08
                                                                                          360                                                                                    gravel (1,613 feet).
2 -____        Replaced -- __..------         ---- -----.---------                                                                                                                                                                             976, 766.77
3 .-------         do----------------                                          1                                                                                                                                                            1, 144, 588. 18
      13.3      Dashields Lock and Dam, 1.6 miles below                             56                                        19. 7
                  Sewickley, Pa.                                       600 } 37.6                               412. 0    2
                                                                                                                                       Rock ...--          -   --... . .   Rock__------                       100            1929          6 3, 508, 055.37
4     18. 7    Legionville, Pa ........................-----           60      110
                                                                               7. 6                              16. 6         9. 5    _.    do ..............    Gravel;      piles in                       100            1908            1, 071, 472. 21
                                                                                                                                                                                                                                                                 W




                                                                       600                                                                                           gravel.
5     24. 1    Freedom , Pa_ __............. ............         110         7. 5                               14. 5       10. 0    .....do .....-. - .....          do -
                                                                                                                                                                           _............
                                                                                                                                                                           -----                              100            1907              1,080,132.04
                3.1 miles below Beaver, Pa -----------------
6     29. 3
       31. 7    Montgomery Island Lock and Dam, 1. 4
                   miles above Industry, Pa.
                                                                   110
                                                                   156
                                                                   110
                                                                       600
                                                                       600
                                                                       600
                                                                       360
                                                                       600
                                                                               S
                                                                               6.7
                                                                              19.4
                                                                               6.9
                                                                                                                  14. 2
                                                                                                                  16. 7
                                                                                                                  15. 4
                                                                                                                              11.0
                                                                                                                              12. 7
                                                                                                                              11.0
                                                                                                                                        Rock gravel ........
                                                                                                                                        R ock ...............
                                                                                                                                                                  Piles in gravel ......
                                                                                                                                                                  R ock ...............
                                                                                                                                      -- --- do .............. __ .   _ do _.............
                                                                                                                                                                                                              100
                                                                                                                                                                                                               55
                                                                                                                                                                                                              100
                                                                                                                                                                                                                         -
                                                                                                                                                                                                                             1904

                                                                                                                                                                                                                             1914
                                                                                                                                                                                                                                               1, 123, 441. 80
                                                                                                                                                                                                                                           7 6, 000, 000. 00

                                                                                                                                                                                                                                               1,075,000.00
7     36.5     M idland, Pa___---------.........        .........                                                                                                                                                                                            0
8     46. 4    1.7 miles below Newell, W. Va_-__.--....           110 600     6.4                                15. A       12.0      Piles in gravel ......    Rock; piles in gravel_                      100            1911              1, 167, 456.24
9     56. 0    New Cumberland, W. Va -........               ___  110 600     7.4                                15. 4       11.0     .--- do -- -..  ... ... .. Piles in gravel ..---                       100            1914              1,177,100.00
10     66. 2    1.8 miles below Steubenville, Ohio .........       110 600     8.4                                16. 4       11.0      Rock and piles in          -.-- do---- =-------                       100            1915              1, 138, 00. 00 W
                                                                                                                                            gravel.
11     76. 9    2.5 miles below Wellsburg, W. Va ......        __--              110       600       7. 3         15. 4       11. 1     Piles in sand and Piles in sand and                                   100            1911              1, 162, 164.70
                                                                                                                                            gravel.                  gravel.                                                                                     H




12      87. 4   W arwood, W . Va ..........................     110                        600       8.4          15. 4     11.0       --- - do . ------------- -.  . .do
                                                                                                                                                                        do --.......
                                                                                                                                                                           --- do__-------------
                                                                                                                                                                               -
                                                                                                                                                                                                              100            1917              1, 166, 103. 55
13      96. 2   McMechen, W. Va ................             _- 110                        600       7. 3         13. 8      9. 5          -- do ..... --                                                     100            1911              1, 222, 389. 11
14     114. 0   W oodland, W . Va ..........................    110                        600       8. 3         16.4    . 11.0        Rock ..-           -----  Rock .------        --                      100            1917              1, 133, 371.47
15     129. 1   New Martinsville, W. Va ..................      110                        600       7.8          15.4      11.0              do------            ....do-........                             100            1916              1, 180, 477. 63
                                                                                                                                                                                                                                               1, 275, 209. 93   I,
16     146. 5   Bens Run, W. Va .........................110                               600       7.8          15. 4     11. 2      ---- do----------                          .do.... -.-                 100            1917
17     167. 5   4.5 miles above Marietta, Ohio .....-----       110                        600       8. 2         15.4      11.0       ....do .......
                                                                                                                                                    ..                             do - . .
                                                                                                                                                                                  _do---------------          100            1918              1,362,591.21
18     179. 9   4Y2 miles above Parkersburg, W. Va --- -. _     110
                                                                110
                                                                                           600       6.2
                                                                                                     7.7
                                                                                                                  14. 2
                                                                                                                  16. 9
                                                                                                                            11.0
                                                                                                                            11.0
                                                                                                                                        -. .do.. . - -- -                   -
                                                                                                                                                                           ---

                                                                                                                                                                   d o .......
                                                                                                                                                                 - do ........
                                                                                                                                                                                                              100
                                                                                                                                                                                                              100
                                                                                                                                                                                                                             1910
                                                                                                                                                                                                                             1916
                                                                                                                                                                                                                                                  927, 091.26
                                                                                                                                                                                                                                               1, 213, 847. 92
19     192. 2   Little Hocking, Ohio                                                       600                                         Piles in sand, gravel,                                                                                                    bd
                                                                                                                                         and rock.
20    202. 5                        --__................
                Belleville, W. Va __....                                        110        600       7. 5         15.4      11.0       Rock ...........       --   do ....... ------                          100            1917                936, 696. 01
21    214. 5    1.4 miles above Portland, Ohio .....-----                       110        600       5. 6         15.4      11.0   --- do .........                        -odo       __- -                   100            1919              1, 484, 561.96
22    220. 9    Ravenswood, W. Va ..............                                110
                                                                                110
                                                                                           600       7.8          15. 4     11. 2     ----
                                                                                                                                       do ..----.                          .....
                                                                                                                                                                               do__                           100            1918              1, 218, 797. 86
23    231.4     Millwood, W. Va ..............                                             600     8 8. 1         15.4    9 11. 0 ....do                                     .----
                                                                                                                                                                               do . --
                                                                                                                                                                                    -- --                     100            1921              1, 835, 941. 59
24    242. 5    0.9 mile below Racine, Ohio .......                             110        600       7.0          15. 4     11, 0 ... ..---- ......
                                                                                                                                       do                                      do_--
                                                                                                                                                                           .....                              100            1919              1, 187,241.  87

  Footnotes at end of table,
                                                                                                                                                  -                                -   _     :




                                                                                                                             Lock
                                          Location
                                                                                            Dimensions                    Depth on miter                                                                              Per     Year    Estimated or
                                                                                                                              sills                                                                                  cent-   opened     actual cost
                                                                                                                                                                                            Character of dam          age       to     of each lock
No.                                                                                                                   -              _
                                                                                                                                                                                              foundation                                                    0
                                                                                                                                                                 Character of                                        com-     nav-      and dam 1
                                                                                                                                                                                                                             gation
        Miles                                                                       Width Greatest                                                               foundation                                         pleted
        below                Distance from nearest town or mouth of                   of   length                                                                                                                                                           H
                                       navigable tributary                                available
                                                                                    cham- for full
                                                                                                            Lift          Upper Lower
        Pitts-                                                                                                                                                                                                                                              0
        burgh                                                                        ber
                                                                                           width
      -1-I            -I                                                        I
                                                                                S                       I             I             I-                tI                               I                        I
                                                                               Feet             Feet         Feet          Feet          Feet                                                                                                               -I
25           260. 7        4.5 miles above Point Pleasant, W. Va_----            110              600          9.0          15.4          11.0              Rock . _.        _.- -----Rock__-------------              100    1922     $1, 923, 704. 60
26           278. 5        Hogsett, W. Va----------------------------            110              600          7. 5         16. 9         11.0             -- . do-- -----------     ---- do      ----------           100    1912      1,307,241.24
             279. 2        Gallipolis Lock and Dam, 0.4 mile below (             110              600       } 26.0          18.0          12.0                                                                                (10)          (10)
                              Hogsett, W. Va.                                  S 110              360                                                           do ...........
                                                                                                                                                      -----do---------------            --- do-----                                                         0
27           301.0         3.6 miles above Proctorville, Ohio--- ------          110              600         6.4           15. 4         11. 1 ----.do .....-- - ---- --        do----                      100              1923      2, 015, 601.50
28           311.6         3.3 miles below Huntington, W. Va_           _------ 110               600         7. 1          15. 4         11.0                                   do---------                 100              1915      1, 063,132. 77
                                                                                                                                                       do .............                                                       1916      1, 088, 801.73
29           319. 9        2.7 miles above Ashland, Ky----------------           110              600         8. 0          15. 4         11.0         do                        do-------                   100
30           339. 4        3.3 miles below Greenup, Ky--------_-------           110              600         7. 5          15.4          11.0     ----do---- --...    ..   --   do_                         100              1923      1, 579, 617. 80
31           359. 3        3.3 miles below Portsmouth, Ohio------__--            110              600         7. 5          15.4          11.0         do___---- ----       .....do-------------- 100                         1919      1, 359, 230.62      td
32           382. 6        1 mile above Rome, Adams County, Ohio_--              110              600         7. 5          15.4          11.0   Piles in sand and Caissons on gravel                        100              1926      2, 951, 215. 97
                                                                                                                                                    gravel.                    and clay.
33           405. 1        3.5 miles above Maysville, Ky      -----------                110      600          7.0          15.4          11.0 --. do ... - ... ... .. Piles in sand and                     100              1921       1, 872, 868. 31
                                                                                                                                                                               gravel.
34           434. 1        Chilo, Ohio......------   ---------------                     110      600          5.6          15. 4         11.0 ----_ do .................do .. ..----------                  100              1925      3, 437, 056.   58
35           451.0         1 mile below New Richmond, Ohio - ------                      110      600          6.4          15.4          11.0 -----   do
                                                                                                                                                     do--------------       .....do . . .         .--------- 100              1919      1, 894, 942.   52
36           460. 9        9.3 miles above Cincinnati, Ohio -----------                  110      600          7. 9         15.4          11. 1 -----  do- _.._ . ...       .....
                                                                                                                                                                          -___   do ...... _-_----- 100                       1925      3, 704, 534.   91
37           483. 2        Fernbank, Ohio---------                 -----                 110      600          7.8          12. 3         11.0   R ock ...............       Rock ...............            100              1911      1, 297, 923.   86
38           503. 3        Moxville, Ky-------------                     ----            110      600          7.3          15. 4         11.0   Piles in sand and Piles in sand and                         100              1924      2, 857, 040.   24
                                                                                                                                                    gravel.                    gravel.                                                                      r2
39           531. 7        1 mile above Markland, Ind-           -----                   110      600          6.0          15. 4         13. 0 --.. do ..............       Rock and piles in               100              1921      2, 222, 447. 98
                                                                                                                                                                               sand and gravel.
40           555. 9        Eliminated.        -      -                                                                                                                                 ----------------------
                                                                                                  600
41           604. 4        Louisville, Ky------------                                   110

                                                                                                11360        37.0           19. 0         11. 0            R ock ...............           Rock_     --                100    1921    127, 602, 667. 12
                                                                                    l   11 56
42                         Eliminated     -------       -----------------
43           633. 2        3.3 miles below West Point, Ky                                110      600          9.0          15. 4         11.0   Pile                 Pile    -                                        100    1921       2, 587, 731.88
44           663. 2        Leavenworth, Ind ..           ---                             110      600          7.0          15.4          13. 0  .... do -            Rock and pile ......                             100    1925       2, 818, 763. 39
45           703. 0        Addison, Ky__                                                 110      600          9.0          17. 4         13. 0 Rock___               .ddo       -                                     100    1927     6 3, 057, 080. 05
46           757. 3        Owensboro, Ky        ---------------------                    110      600         11. 0         17. 4         11.0   Pile                 Pile    --     -                                 100    1928     6 3, 005, 672. 75
47           777. 7        Newburgh, Ind_            -       -          -                110      600          9. 0         15.4          11.0 __ do --------------  ..... do -                                        100    1928       4, 415, 525. 82
48           809. 6        5.8 miles below Henderson, Ky                                 110      600
                                                                                                  600
                                                                                                               7.0
                                                                                                              11.0
                                                                                                                            15.4          13. 0       -----
                                                                                                                                                      do.. --......  ... .do -                                         100    1922
                                                                                                                                                                                                                              1928
                                                                                                                                                                                                                                         3, 062, 699.94
                                                                                                                                                                                                                                       6 3, 164, 558. 03
49           845. 0        23l miles below Uniontown, Ky---------                        110                                17.4          13. 0 Rock ......... ..... Rock -- - - - - - -                               100
50           876. 8        1 mile below Weston, Ky_ _                     .              110      600         10. 0         17. 4         11.0 ---- do-               Rock and pile ---                                100    1928     6 3, 602, 725. 28
  1      903. 1   0.6 mile below Golconda, I.........ll---------------...             110          600          8.         15. 4          11. 0 Rock and boulders--. Pile ---------------        - 100   1929            4, 370, 566. 20
52      938. 9   1.4 miles below Brookport, Ill..--------------                      110          600         12.0        15.4            11. 0    Pile--------   -------   do-.-------------     100    1928            4, 462, 836. 79
53.     962. 6   10.8 miles above Mound City, Ill-----------............             110          600         13. 4       15. 4         139. 6    ..... do---------------   do----------          100    1929            5, 413, 867. 94
54      974. 2   Mound City, Ill      ___-------------------------                   110          600        (14)        (14)            (14)      Rock-------------      Gravel-------------       0 --------              (15)

                                                                                                                                                                                                                     18118, 861,    331.59


       1 Actual costs except Montgomery Island Lock and Dam, which is estimated.
       2 Will change to 12.9 feet when Dashields Dam is raised 2 feet as authorized July 20, 1934.
    3 Will change to 10.0 feet when Montgomery Island Dam is completed and Dams Nos. 4, 5, and 6 are removed and Dashields Dam raised 2.0 feet.
    4 Will change to 14.0 feet when Dashields Dam is raised 2.0 feet.
    5 Will change to 17.3 feet when Montgomery Island Dam is completed and Dams Nos. 4, 5, and 6 are removed.
    6 Actual cost exclusive of additional cost of raising dam, which subsequent work has not been completed.
    7 New fixed dam; will replace existing movable Dams Nos. 4, 5, and 6.
    8 Will change to 5.6 feet when Gallipolis Dam is completed and Dams 24, 25. and 26 are removed.

    9 Will change to 13.5 feet when Gallipolis Dam is completed and Dams 24, 25, and 26 are removed.
    to New fixed dam. Will replace existing movable Dams Nos. 24, 25, and 26. Parallel locks under construction. Estimated cost not included in total as it is being constructed
under project for improving Lower Kanawha.
    11Clear width and length of new auxiliary lock.
    12Completed with large new lock in 1921. Completed with new dam and raised canal and lock walls in 1928. Construction of an auxiliary lock commenced in 1929, which
lock was completed in 1930.
    13 Dam below not commenced.        Depth on lower miter sill at low water.
    14Necessity for construction has not yet been determined.
    15Not commenced.
    18Exclusive of $6,675,513.63; details below.

                                                                                   ADDITIONAL FEATURES ENTERING INTO COST OF PROJECT

Repair station, Marietta, Ohio....--------------------------------------------------------------------------------------------------------                                                                                  $178, 700.   00
Louisville and Portland Canal, and Indiana chute (under previous project) ..........-----------------------------...                                                                                                      5, 359, 20.
                                                                                                                                                                                ....----------------------------------------             17   I
Repairs to Sand Island Dike, Louisville, Ky. (maintenance)                                            ---------------------------------------------------------                                                              130, 000.   00
Examinations, surveys, contingencies, plant, and miscellaneous                             __           ---------------------------- ------------------------------------------                                           1, 007, 610.   46

                                                                                                                                                                                                                         6, 675, 513. 63

         Total.------ --------                     -----------------------------------------------------------------------------------                                                                                125, 536, 845. 22
920          REPORT          OF CHIEF OF ENGINEERS,                         U.     S.   ARM1VY,      1934

                        Principal towns and cities along the Ohio River

                                  Miles                                  Miles                                    Miles
          Location                below
                                  Pitts-           Location              below
                                                                         Pitts-             Location              below
                                                                                                                  Pitts-
                                  burgh                                  burgh                                    burgh



                          -__
Pittsburgh, Pa-------------
Ambridge, Pa
Aliquippa, Pa .------------
                                   15. 9
                                   18. 5
                                            Ironton, Ohio ..----------
                                            Portsmouth, Ohio.......
                                            Maysville, Ky------ -_
                                                                          327. 2
                                                                          356. 0
                                                                          408.6
                                                                                    Cannelton, Ind---------
                                                                                    Rockport, Ind. _
                                                                                    Owensboro, Ky ----
                                                                                                           _
                                                                                                                    724. 1
                                                                                                                    747. 3
                                                                                                                    755. 9
East Liverpool, Ohio               43. 5    Newport, Ky ___________       469.8     Newburg, Ind _________          778. 0
Steubenville, Ohio------.          68.0     Cincinnati, Ohio -----        470. 2    Evansville, Ind---------        792. 3
Wheeling, W. Va .------            90. 5    Covington, Ky---------        470.9     Henderson, Ky ........          803.8
Bellaire, Ohio..------------       94. 6    Lawrenceburg, Ind-.....       492. 9    Mount Vernon, Ind-....          829. 2
Marietta, Ohio .---------- 172. 0           Aurora, Ind---                496. 7    Shawneetown, Ill .-...          857. 8
Parkersburg, W. Va .....           184. 6   Carrollton, Ky-.........      545. 7    Golconda, Ill ..-----------     902. 4
Point Pleasant, W. Va___          265. 2    Madison, Ind---               557. 7    Paducah, Ky ....-----------     934.4
Gallipolis, Ohio...----------     269. 7    Jeffersonville, Ind..-..     602. 7     Metropolis, Ill...._ _          943. 9
Huntington, W. Va ...-            308. 3    Louisville, Ky .-.--..       603. 9     Mound City, Ill..... --         973. 4
Catlettsburg, Ky_________         317. 2    New Albany, Ind_____         608. 5     Cairo, Ill--- _____-_____ _     979. 3
Ashland, Ky-------......      .   322.6     Leavenworth, Ind_......      664.0



   T'eirninal facilities.-Modern public terminals, with warehouses,
equipped with operating machinery for transferring materials, have
been constructed by private interests at some of the larger cities
and towns. During the year a private terminal was constructed at
Ironton, Ohio, by the Product Coke C'o., New York City.
   The city of Pittsburgh contemplates the early construction of an
adequate modern terminal with ample facilities for river-to-rail
transfer of freight for general use.
   A complete list of terminals available to the public, on the Ohio
River, as of June 30, 1934, can be obtained from the division
engineer, Ohio River Division, Cincinnati, Ohio.
   Operations and results during fiscal year.-The work accomplished
during the fiscal year and classed as new work was as follows:
   Regular funds-Montgomery, island Locks, Pa.-The lock walls
were completed except for the final pour on six monoliths of the
lower guide wall. The gates for both locks were completely installed,
and installation of the lock operating machinery was commenced by
hired labor. Work under the contract for the locks is 96 percent
complete. The cost during the fiscal year, all for new work, was
$1,019,629.31; the expenditures were $1,063,766.14.
   Lock and Dam No. 15.-The raising of the lower guide wall at
Lock No. 15 was completed by contract. The cost during the fiscal
year, all for new work, was $15,039.53; the expenditures were $16,148.
   Lock and Dam, No. 29.-The contract for constructing a new trip-
ping bar weir was completed. The cost during the fiscal year, all for
new work, was $24,100.44; the expenditures were $26,063.22.
   Lock and Dam No. 41.-The purchase of flowage easements re-
sulting from the raising of the pool of Dam No. 41 was continued.
Eighty-two easements were purchased at a cost of $61,361.13. To
date 439 claims have been received and final action taken in 373
cases.
  Look and Dam No. 49.-Payment was made for one parcel of the
land washed away below the abutment of the dam.
                  RIVERS AND    HARBORS-OHIO       RIVER               921
   The cost during the fiscal year, all for new work, at Locks and
Dams Nos. 41 and 49 (Louisville district) was $95,686.48; the ex-
penditures were $95,631.88.
   P blic Works funds.-At Montgomery Island Dam the abutment
site was cleared, 2,500 cubic yards of common excavation were re-
moved, and construction of the first section of the dam cofferdam
was commenced. The cost during the fiscal year for new work was
$24,812.64 and the expenditures were $17,750.67.
   Locks and Dams Nos. 44, 45, 46, 48, 49, and 50.-The modification
of these structures has been in progress since October 1933. This
involves the raising of the pools of Dams Nos. 45, 46, 49, and 50
two feet by the installation of longer wickets, raising the tops of
the lock walls, lock gates, bear traps, fixed weirs, and abutments, and
the modification of Bebout wickets at Dams Nos. 44 and 48. All
material required for the work has been purchased under contract
and the work at the dams is in progress by hired labor and Gov-
ernment plant. The work was approximately 67 percent complete
at the close of the fiscal year. The cost during the fiscal year for
new work was $307,604.47 and the expenditures were $255,474.63.
   The total cost during the year for new work was $1,486,872.87,
and total expenditures were $1,474,834.54, of which amounts $332,-
417.11 and $273,225.30, respectively, were applicable to work per-
formed with Public Works funds.
   Condition at end of fiscal year.-The entire system of locks and
dams is practically completed. All of the structures are in opera-
tion, thereby providing 9-foot navigation throughout the entire
length of the river. At certain locations where gravel deposits or
obstructive bars exist, dredging operations, supplemented by contrac-
tion works, are executed in order that the full project depth may be
afforded at all times. The table under existing project shows the
year of completion of locks and dams now in operation. The
fixed dam now under construction at Montgomery Island will re-
place existing Dams Nos. 4, 5, and 6; and the fixed dam at Galli-
polis, Ohio (under the Kanawha River project), will replace
existing Dams Nos. 24, 25, and 26.
   The total cost of existing project to the end of the fiscal year for
new work was $104,336,162.49, of which $332,417.11 was applicable
to work performed with Public Works funds. In addition $130,000
was expended for maintenance, making a total cost of $104,466,162.49.
The total expenditures under the existing project were $104,305,329.31,
of which $273,225.30 was from Public Works funds.
   The total cost and expenditure on previous 6-foot canalization, the
works of which were incorporated in the above, was $17,657,273.78,
making a total cost of $121,993,436.27 for new work.
   Proposed operations-Regular fuwnds.-The balance unexpended,
including accounts receivable on June 30, 1934, and allotments made
in July 1934, will be applied as follows:
Accounts payable June 30, 1934--------------------------------- $54, 476. 70
New work :
    Dashields Dam: Raising fixed crest on dam by hired labor
      (Aug. 1, 1934, to June 30, 1935) ------------------        30, 000. 00
922      REPORT OF CHIEF OF ENGINEERS,                   U. S. ARMY,    19 3 4

New York-Continued.
   Third fixed dam, Montgomery Island:
       Completion of Montgomery Locks by contract
          (July 1934 to Sept. 30, 1934)--------------$110,000. 00
       Completion of necessary appurtenances, except
          dam and building, by hired labor (July 1934
         to June 30, 1935) __---    _______--______ 225, 000. 00
       Construction of buildings by contract (July 1,
         1934, to Dec. 31, 1934)------------------      27, 000. 00
                                                                    -362, 000. 00
   Dam No. 41: Purchase of flowage easements in pool and surveys
     in connection therewith----------------------------------- 38, 010. 67
        Total for new work.......                                           484, 487. 37
Balance remaining            -__    ___________                              43, 498. 49
      Total -------------------------------------------------- 527, 985. 86
  Public Works Administration program.-The balance unexpended
of funds allotted from the National Industrial Recovery Act will be
applied as follows:
Accounts payable June 30, 1934     __        ---------                      $60, 552. 72

New work :
   Third fixed dam, Montgomery Island:
       Construction of Montgomery Island Dam
         by contract (July 1934 to December
         1935)                                      $2, 695, 187. 36
                                                 -_______
       Purchase of land and flowage easements
           (July 1934 to June 1935) --------------        30, 000. 00
                                                                         2:, 725, 187. 36
    Dam No. 45: Raise crest by hired labor (July 1 to October
      1934)                       _                                          55, 000. 00
    Dam No. 46: Raise crest by hired labor (July 1 to October
      1934)                       _                                          12, 000. 00
    Dam No. 49: Raise crest by hired labor (July 1 to October
      1934) ---------------------------------------------                    45,000. 00
    Dam No. 50: Raise crest by hired labor (July 1 to October
      1934) ----------------------------------------                         39, 731. 39
        Total for new work_---------------------------------             2, 876, 918. 75

        Total (including accounts payable) __--------------------        2, 937, 471. 47
  The additional sum of $66,000 can be profitably expended during
the fiscal year ending June 30, 1936, in the removal of Dams Nos.
4, 5, and 6, by contract, in time to anticipate completion of the
Montgomery Island Lock and Dam.
                          Cost and financial summary
                     MAINTENANCI AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934___-------------------------- $121, 661, 019. 16
Cost of maintenance to June 30, 1934------------------------         130, 000. 00
      Total cost of permanent work to June 30, 1934--------- 121, 791, 019. 16
Value of plant, materials, etc., on hand June 30, 1934-----------. -48, 392. 99
      Net total cost to June 30, .1934------------------------121,         742, 626. 17
Plus accounts receivable June 30, 1934-----------------------                1, 228. 32
      Gross total costs to June 30, 1934-                 -----        121, 743, 854. 49
Minus accounts payable June 30, 1934------------------------                 54, 476. 70
     Net total expenditures----                                        121, 689, 377. 79
Unexpended balance June 30, 1934-----------4                                709, 047.54
      Total amount appropriated to June 30, 1934 ..-------             122, 398, 425. 33
                           RIVERS            AND HARBORS-OHIO                         RIVER                       923

      Fiscal year ending             1930              1931                1932               1933            1934
           June 30
                           C
Cost of new work-....                084.83
                               $2,683,               $681, 975. 56      $985, 161. 03   $1,392,328.45            455.76
                                                                                                           $1,154,
Cost of maintenance .      ---------------- ---------------          --------------

Total expended...._____                44
                               2,399,898.             566, 093. 41        979,379.64     1, 224,260.20      1, 201,609.24
Allotted..     .....                158, 850. 00      361, 296. 58        469,316.88     2, 857,097.50       166, 786. 26


Balance unexpended July 1, 1933-------------------------- $1, 743,870.52
Amount allotted from War Department Appropri-
  ation Act approved Feb. 23, 1927--------------- $25, 000. 00
Amount allotted from War Department Appropria-
  tion Act approved July 14, 1932------------     111, 280. 00
Amount allotted from War Department Appropria-
  tion Act approved Mar. 4, 19,33----- ----------  70, 000. 00
                                                               206, 280. 00

      Amount to be accounted for----------------------------1, 950, 150. 52
Deductions on account of revocation of allotment and impounded
      funds    -___            __           __                                                             39, 493.74

      Net amount to be accounted for                                                                   1, 910, 656. 78
Gross amount expended-----------------------$1, 203,717.47
Less reimbursements collected-------------------  2, 108. 23
                                                                                                       1, 201, 609.24
      Balance unexpended June 30, 1934----------------------                                              709, 047. 54
Outstanding liabilities June 30, 1934------------ $24,514.17
Amount covered by uncompleted contracts--------   107, 430. 12
                                                                                                          131, 944. 29

      Balance available June 30, 1934-------------------------                                            577, 103. 25
Accounts receivable June 30, 1934-----------------------------__                                            1,228. 32
     Unobligated balance available June 30, 1934-------------                                             578, 331. 57
Amount allotted from War Department Appropriation Act ap-
proved Mar. 4, 1933----------------------------------------                                               30, 000. 00

                                                                                                          608, 331. 57
Amount revoked during July 1934-----------------------------                                              212:, 290.00
           Balance available for fiscal year 1935-------------------                                      396, 041.57
Amount that can be profitably expended in fiscal year ending
   June 30, 1936, for maintenance 1-__                                                                     66, 000.00
                                                 PUBLIC WORKS 3 UNDS

Cost of new work to June 30, 1934 _______________________-- -$332,                                           417. 11
Cost of maintenance to June 30, 1934_______________________                                               _______
      Total cost of permanent work to June 30, 1934 __________                                            332, 417. 11
Value of plant, materials, etc., on hand June 30, 1934______--                                                 664. 14
      Net total cost to June 30, 1934________________________                                             333, 081.25
Plus accounts receivable June 30, 1934_.__- ....    __ __                                                      696. 77
      Gross total costs to June 30, 1934 _..._____--__--                                       ___.-      333, 778.02
Minus accounts payable June 30, 1934_______                -____                              ____
                                                                                                 --      -60, 552. 72
     Net total expenditures___ __-----------.......      ....    .                         ____           273, 225. 30
Unexpended balance June 30, 1934_ -__-___                ___                                __         2, 871, 774. 70
     Total amount appropriated to June 30, 1934 ______                                    _____        3, 145, 000.00
  1   Exclusive of available funds.
924              REPORT             OF CHIEF               OF ENGINEERS,                 U.     S. ARMY,            1934


     Fiscal year ending June 30                           1930              1931              1932           1933              1934


Cost of new work.......-------.-------------------------                                -----------------------             $332,417.11
Cost of maintenance- .----------------------------------------------------
Total expended..---.....--------------------------------------                     -                   --------------        273,225.30
Allotted...................----------------------   ----------------- ------- ---------------------------                  3,145,000. 00


Amount allotted from National Industrial Recovery Act approved
June 16, 1933        -------------------- -----------         ----- $3, 245, 00. 00
Deductions on account of revocation of allotment--------------           100, 000. 00

      Net amount to be accounted for----------    ----                                                               3,145, 000. 00
Gross amount expended-     ---------------------- $273, 391.17
Less reimbursements collected ------------------        165. 87
                                                                                                                        273, 225.30

      Balance unexpended June 30, 1934----    ----------------                                                      2, 871, 774. 70
Outstanding liabilities June 30, 1934-------------$60, 364. 90
Amount covered by uncompleted contracts-------- 2,625, 830.57
                                                                                                                    2, 686, 195. 47

      Balance available June 30, 1934------------------------185, 579. 23
Accounts receivable June 30, 1934_-------------------------       696. 77

     Unobligated balance available June 30, 1934--------------                                                          186, 276. 00
Amount allotted by Public Works Administration Emergency
Appropriation Act, fiscal year 1935------------------------                                                             65, 000. 00

            Balance available for fiscal year 1935---------------- ---                                                  251, 276. 00
    CONSOLIDATED COST AND FINANCIAL SUMMARY FOR OHIO RIVER, LOCK AND DAM
                                 CONSTRUCTION

Cost of new work to June 30, 1934-----------------------$121, 993, 436. 27
Cost of maintenance to June 30, 1934 ------------------------ 130, 000. 00
      Total cost of permanent work to June 30, 1934---------122, 123, 436. 27
Value of plant, materials, etc., on hand June 30, 1934--------- -47, 728. 85

      Net total cost to June 30, 1934--------- ---------     122, 075, 707. 42
Plus accounts receivable June 30, 1934------------------------      1, 925.09

     Gross total costs to June 30, 1934------------------- 122, 077, 632. 51
Minus accounts payable June 30, 1934 ----------------------     115, 029. 42

                                   -----------------------
     Net total expenditures--..--....                      121, 962, 603.09
Unexpended balance June 30, 1934------------------------     3, 580, 822. 24

            Total amount appropriated to June 30, 1934-----------125, 543, 425. 33

   Fiscal year ending                        1930                  1931                1932              1933
           June 30                                                                                                            1934


Cost of new work--- ..   $2, 683, 084. 83                        $681, 975. 56     $985, 161. 03     $1, 392, 328. 45   $1, 486, 872. 87
Cost of maintenance- ---------
Total expended.....---------            2, 399, 898. 44           566, 093. 41      979, 379. 64      1, 224, 260. 20      1, 474, 834. 54
Allotted--_ ------------                   158, 850. 00           361, 296. 58      469, 316. 88      2, 857, 097. 50      3, 311, 786. 26:
                    RIVERS AND HARBORS-OHIO RIVER                                    925
Balance unexpended July 1, 1933---------------------------        $1, 743, 870. 52
Amount allotted from War Department Appropria-
tion Act approved Feb. 23, 1927---------------      $25, 000. 00
Amount allotted from War Department Appropria-
tion Act approved July 14, 1932         __          111, 280. 00
Amount allotted from War Department Appropria-
tion Act approved Mar. 4, 1933                 -     70, 000. 00
Amount allotted from National Industrial Recovery
Act approved June 16, 1933------------------     3, 245, 000. 00
                                                                   3, 451, 280. 00

      Amount to be accounted for---------------------------,                 195, 150. 52
                                                                               195,
Deductions on account of revocation of allotments --------------             139, 493. 74

      Net amount to be accounted for------------------------               5, 055, 656. 78
Gross amount expended----------------------- $1,477, 108. 64
Less reimbursements collected-----------------      2,274. 10
                                                                           1, 474, 834. 54

      Balance unexpended June 30, 1934----------------------3, 580, 822. 24
Outstanding liabilities June 30, 1934 ------------ $84, 879. 07
Amount covered by uncompleted contracts-------- 2,733, 260. 69
                                                                2, 818, 139. 7
      Balance available June 30, 1934------------------------                 762, 682. 48
Accounts receivable June 30, 1934-----------------------------                  1,925. 09

     Unobligated balance available June 30, 1934--------------               764, 607. 57
Amount allotted by Public Works Administration Emergency
Appropriation Act, fiscal year 1935--------------------------                 65, 000. 00,
Amount allotted from War Department Appropriation Act ap-
proved Mar. 4, 1933----------------------------------------                  30, 000. 00

                                                                             859, 607. 57
Amount revoked during July 1934 -----------------------------                212, 290. 00
     Balance available for fiscal year 1935 ------------------               647, 317. 57
Amount that can be profitably expended in fiscal year ending
                                        -
  June 30, 1936, for maintenance 1---                               ___-
                                                                     --        66, 000. 00

2. OPERATING AND CARE OF LOCKS AND DAMS ON THE OHIO RIVER
  The improvement for which report is made under this caption
forms part of the project for construction of locks and dams on the
Ohio River. See pages 915 to 925, where general information re-
garding the improvement may be found. The completed locks and
dams have been operated and maintained under the permanent
indefinite appropriation since the following dates:
No.                                         No.
1. October 7, 1885 2                        8. July 14, 1911
    Emsworth, September 1, 1921              9. November 2, 1914
2. October 13, 1906 2                      10. October 31, 1915
3. February 1, 1908 2                      11. August 1, 1911
    Dashields, Pa.                          12. January 16, 1917
      Small lock, August 1, 1929            13. August 1, 1911
      Large lock, August 23, 1929.          14. August 20, 1917
4. February 1, 1908 8                      15. July 1, 1916
5. November 21, 1907                       16. August 16, 1917
6. August 3, 1904 3                        17. August 1, 1918
7. September 16, 1914                      18. May 1, 1910

  1 Exclusive of available funds.
  2 Replaced.
  8 To be replaced by dam with double locks at Montgomery Island,
926       REPORT ,OF       CHIEF OF ENGINEERS, U. S. ARMY,        19 3 4

No.                                       No.
19.   October 16, 1916                    38. October 31, 1924
20.   January 16, 1917                    39. March 15, 1921
21.   September 5, 1919                   41. Including Louisville and Portland
22.   December 1, 1918                          Canal, July 1885
23.   September 26, 1921                      New lock, May 1, 1921
24.   August 27, 1919 4                       Small lock, August 1, 1930
25.   June 1, 1922 4                          New dam, January 1, 1928
20.   August 1, 1912 4                    43. June 13, 1921
27.   July 23, 1923                       44. September 12, 1925
28.   March 1, 1915                       45. September 13, 1927
29.   December 1, 1916                    46. September 15, 1928
30.   October 19, 1923                    47. January 1, 1928
31.   October 22, 1919                    48. January 1, 1922
32.   May 1, 1926                         49. January 1, 1928
33.   October 28, 1921                    50. October 16, 1928
34.   July 31, 1925                       51. August 25, 1929
35.   September 3, 1919                   52. October 27, 1928
36.   August 14, 1925                     53. September 1, 1929
37.   January 1, 1911
  Operations and results during fiscal year.-The locks and dams
were operated as required, and the necessary repairs made thereto
and to the appurtenant structures.
  The total cost of operating and care for the entire river during
the fiscal year was $2,333,249.44; the total expenditures were $2,200,-
894.59.
   Condition at end of fiscal year.-The entire system, comprising 50
locks and dams, is practically completed and all of the structures are
in operation. The dams, when raised, provide a 9-foot depth
throughout the entire length of the river. At various localities
where bars or gravel deposits exist, dredging and contraction works
are executed to provide an adequate and dependable channel of
project depth at minimum pool conditions. The fixed dam now
under construction at Montgomery Island will replace existing
Dams Nos. 4, 5, and 6, and the fixed dam now being constructed
at Gallipolis, Ohio (under the Kanawha River project) will replace
existing Dams Nos. 24, 25, and 26.
   The total cost for operation and maintenance at the close of the
fiscal year was $34,416,978.55. The total expenditures were $35,493,-
740.22, of which $33,796,160.03 was allotted from the permanent in-
definite appropriation and $1,697,580.19 was derived from other
sources.
   Proposed operations.-The locks and dams will be operated and
maintained under allotments from appropriations made available
for such purposes.
                             Cost and financial summary
Cost of maintenance to June 30, 1934 6_____________       _____$34, 416, 978. 55
Value of plant, materials, etc., on hand June 30, 1934 _________  1, 079, 002. 96
      Net total cost to June 30, 1934________________________    35, 495, 981. 51
Plus accounts receivable June 30, 1934_____________________           55, 456. 68
      Gross total costs to June 30, 1934______________________ 35, 551, 438. 9
Minus accounts payable June 30, 1934 ____.___________-____            57, 697.97
     Net total expenditures__________________________              35, 493, 740. 22
Unexpended balance June 30, 1934_______________________                415, 669.11
     Total amount appropriated to June 30, 1934----_               35, 909, 409.33
  &To be replaced by dam with double locks at Gallipolis.
  SPrior to date stated these works were operated and maintained between 1874 and
1882 from funds derived from tolls, rents, etc.
  oPrevious cost reduced $214,962.18 account adjustment of plant account.
                            RIVERS AND HARBORS-OHIO                                    RIVER                            927

   Fiscal year ending June 30                1930              1931             1932              1933              1934

Cost of new work .   ..         .---------------
Cost of maintenance2----------       $2, 181, 261. 38    $2, 733, 368. 17 $3, 036, 666. 52 $2, 549, 458. 54     $2, 333, 249. 44
Total expended--------------           2, 273, 100. 30   2, 818, 599. 88   2, 994, 445. 50   2, 803, 348. 61     2, 200, 894. 59
Allotted---_------------------ 2, 459, 000. 00           2, 780, 000. 00   3, 001, 149. 47   2, 494, 991. 68     2, 326, 562. 49


Balance unexpended July 1, 1933--------------------------        $290, 001. 21
Amount allotted from permanent indefinite appropriation, sec. 6,
  River and Harbor Act, Mar. 3, 1909 ---------------------- 2, 502, 163. 42

      Amount to be accounted for_ _----         ______________--                                          2, 792, 164. 63
Deductions on account of revocation of allotment_----_____----                                               175, 600. 93

      Net amount to be accounted for__-------___--  -------          2, 616, 563. 70
Gross amount expended---------------------          $2, 784, 736. 20
Less-
    Reimbursements collected- ---- __ $423, 040. 22
    Receipts from sales----__-----      160, 801.39
                                                        583, 841. 61
                                                                     2, 200, 894. 59
      Balance unexpended June 30, 1934__-- ----------------                                                    415, 669. 11
Outstanding liabilities June 30, 1934____________   '$187, 995. 76
Amount covered by uncompleted contracts- -----           12, 724. 68
                                                                                                               200, 720. 44
      Balance available June 30, 1934------------------                                                        214, 948. 67
Accounts receivable June 30, 1934 __--- ______--------------                                                    55, 456. 68

     Unobligated balance available June 30, 1934_ -_____.._-                                                 270, 405. 35
Amount allotted for fiscal year 1935_------------------------                                             2,442, 000. 00

Balance available for fiscal year 1935 ---- _---------------                                              2, 712, 405. 35

                          3. OPEN-CHANNEL WORK, OHIO RIVER

   Open-channel work on the Ohio River is in charge of the district
engineer in whose district the work is located.
   Information as to the limits of the four districts on the Ohio River,
as well as the district engineers in charge thereof, is contained on
page 914.
   Existing project.-The project adopted by the act of March 3, 1827,
originally covered the entire length of the Ohio River from its mouth
near Cairo to Pittsburgh, a distance of 981 miles. With the com-
pletion of the canalization project, the work under the project for
open-channel work consists mainly of removing obstructive bars and
widening and deepening the channel at the upper ends of pools where
necessary in order that the full project depth of 9 feet contemplated
by the canalization project may be obtained. After this depth has
been obtained° it is anticipated that periodic dredging will be re-
quired at some localities in order to maintain such depth. In addi-
tion, the depth is being maintained on that section of the river below
Lock and Dam No. 53 by open-channel work.
   Under the project for open-channel work no project depth had been
fixed by Congress, but it was found necessary, to properly aid packet
and barge navigation, prior to completion of the canalization project,
       91536--ENG         1934-59
928    REPORT OF    CHIEF OF ENGINEERS,      U. S.   ARMIY,   19 34


to secure a low-water channel having a minimum depth of from 4 to
6 feet and a width, according to the difficulty of running the channel,
of from 400 to 600 feet; and to permit the movement of large coal
tows, which movement occurs at stages of water exceeding 10 feet, it
has been found necessary to remove the points of projecting bars
which form at various points along the river but mainly at the
mouths of creeks and other tributaries. The accomplishment of this
twofold purpose involves the concentration of current by closing
back channels at islands with low dams, the contraction and straight-
ening of wide, open channels by low dikes, the dredging of bars and
shoals, and the removal of snags and wrecks.
   The River and Harbor Act approved January 21, 1927, authorized
the construction of ice piers as a part of the project for open-channel
work, these piers to be constructed with funds allotted from the ap-
propriations for general open-channel work (H. Doc. No. 187, 67th
Cong., 2d sess.).
   The River and Harbor Act approved July 3, 1930, authorized re-
forestation of the sloughs on Kentucky Peninsula near Evansville,
Ind., and a 200-foot strip along the upstream bank and for bank pro-
tection, at an estimated cost of $200,000 (H. Doc. No. 409, 69th Cong.,
1st sess.). This document contains a map of the locality.
   The extreme range of river stages varies from 36.8 feet at Pitts-
burgh, Ia., to 69.2 feet at Cincinnati, Ohio, with 45.6 feet at Louis-
ville, Ky. (head of the falls), 48.1 feet at Evansville, Ind., and 57.4
feet at Cairo, Ill. (mouth of the river).
   Incidental to the direct improvement of the Ohio is the mainte-
nance of existing works, including dikes, dams, and ice piers; also
harbor lines below mouth of Big Sandy River.
   The estimated cost of new work, revised in 1933, is $17,050,000,
which includes $200,000 for bank-protection work near Evansville,
Ind., authorized in the 1930 River and Harbor Act.
   Local cooperation.-The River and Harbor Act approved January
21, 1927, authorizing the construction of ice, piers for general open-
channel work, imposes the condition that before work is begun on
any ice pier, local interests convey to the United States free of cost
such riparian rights as may be deemed necessary in connection with
the improvement at the locality.
   The River and Harbor Act approved July 3, 1930, authorizing the
reforestation of the sloughs on Kentucky Peninsula near Evansville,
Ind., and a 200-foot strip along the upstream bank and for bank pro-
tection, provides that no expense shall be incurred by the United
States for the acquiring of any lands required for the purpose of
this improvement.
   Terminal facilities.-See page 920.
   Operations and results during fiscal year.-Dredging and contrac-
tion works, where required to provide an adequate and dependable
channel of project depth at minimum pool conditions, were executed.
The work accomplished during the year was as follows:
   Regular funds-Pittsburghdistrict.-Sixty-two thousand five hun-
dred cubic yards of dredged material were removed by contract at
Bakers Island, a distance of 49.0 miles below Pittsburgh. In pool
no. 11, at Mingo Bar, U. S. dipper dredge Beaver removed 67,875
cubic yards of material. Channel buoys were inspected and cleaned
                 RIVERS AND HARBORS-OHIO        RIVER              929
at regular intervals and missing buoys replaced. The cost during
the fiscal year was $19,124.69 for new work, and $18,002.59 for main-
tenance. The amount expended was $44,484.40.
   Huntington district.-The contract for dredging at Sand Creek
Bar was completed July 10, 1933. The total yardage removed
amounted to 102,233 of which 20,882 cubic yards were removed dur-
ing the year. Dredging was continued under contract at Twelve
Pole Bar. The total yardage removed amounted to 269,881, of
which 229,981 cubic yards were removed during the year. The fol-
lowing additional dredging was done by Government-owned plant:
27,732 cubic yards were dredged from the lower approach, Lock No.
15; 3,740 cubic yards head of Paden Island; 91,754 cubic yards Wil-
liamson Island; and 20,000 cubic yards Mustapha Island. The cost
during the fiscal year was $232,594.75, all for maintenance. The
expenditures were $168,455.32.
   Cincinnati district. Dredging operations were carried on in the
Cincinnati district by U. S: pipe-line dredge Major J. C. Mallery,
U. S. dipper dredge Marietta, and under contracts. The amount of
material dredged from the channel was 1,529,219 cubic yards.
    United States repair yards Dam No. 37.-Marine ways and
attendant shops and plant were in continuous operation during the
fiscal year. Dockages and repairs were made to various pieces of
Engineer Department plant as well as to the U. S. lighthouse tender
Greenbrier.
    The cost during the fiscal year was $510,892.63, all for mainte-
nance; the expenditures were minus $32,999.78.
   Louisville district.-Dredgingto obtain and maintain a channel of
the project dimensions through obstructive bars at various loca-
tions was carried on by hired labor. The quantity of material
removed was 6,298,313 cubic yards.. Forty-four snags and one wreck
were removed from the channel.
   Work which was begun in the fiscal year 1933, under contract for
constructing three sand-fill dikes having a total length of 3,171 feet
at Walkers Bar and for paving 3,105 linear feet of bank at this bar
with stone was completed during this year. The cost during the
fiscal year was $146,136.78 for new work and $817,892.37 for mainte-
nance, a total of $964,029.15. The expenditures were $1,241,906.08.
   Public Works funds-Louisville district.-Three dikes at Pryors
Island and one at Sisters Island, totaling 4,540 linear feet, and com-
posed of stone, gravel, and sand dredged from the river bed were
constructed. Two existing dikes at Sisters Island totaling 2,500
linear feet were increased in height by 4 feet. All this work was
done by hired labor at a total cost of $175,033.72.
   A back channel dam having a length of 1,208 feet and composed
of heavy riprap was constructed at Wabash Island under contract
at a cost of $82,001.64.
   Work was begun under contract for paving the bank at Kentucky
Peninsula and Dutch Bend, near Evansville, Ind., 6,375 and 5,507
linear feet, respectively, having been completed at a cost of
$268,366.02.
   Rock dredging in the lower approach to Lock No. 41 is being
carried on under contract. The cost has been $36,086.27.
930      REPORT      OF CHIEF OF ENGINEERS,                U.   S.   ARMIY,    1934


   Costs under allotments made from the National Industrial Re-
covery Act were $559,487.65, and expenditures were $443,852.37, all
for new work.
   The total cost in the Louisville district during the year for work
performed under regular funds and funds allotted from the National
Industrial Recovery Act was $1,523,516.80, of which $705,624.43 was
for new work and $817,892.37 for maintenance. The expenditures
were $1,685,758.45.
   The cost during the year for new work on the entire river was
$724,749.12, of which $559,487.65 was applicable to work performed
with Public Works funds and $165,261.47 from regular funds. In
addition, the cost of maintenance during the year amounted to
$1,579,382.34, making a total cost of $2,304,131.46. The amount
expended was $1,865,698.39, of which $443,852.37 was allotted from
Public Works funds and $1,421,846.02 from regular funds.
    Condition at end of fscal year.-Dredges were operated through-
out the year with a view to providing an adequate and dependable
channel 9 feet deep at minimum pool conditions. In general this
channel was maintained. Local stabilization of channel was effected
at various points by construction of dikes and bank revetment.
    The total cost of existing project to the end of the fiscal year for
new work was $11,776,000.52, of which $559,487.65 was applicable to
work performed with Public Works funds and $11,216,512.87 from
regular funds. In addition $9,606,255.81 was expended for mainte-
nance, making a total cost of $21,382,256.33. The total expenditures
under the existing project were $23,103,043.18, of which $443,852.37
was from Public Works funds and $22,659,190.81 from regular funds.
    Proposed operations-Regular funds.-The balance unexpended,
including accounts receivable on June 30, 1934, after deducting revo-
cation of $8,000 made in July 1934, will be applied as follows:
Accounts payable June 30, 1934 ......-                                            $98, 885. 40

Maintenance (July 1934 to June 1935) :
   Dredging--------------------                                                   930, 158. 95
   Dikes and revetments---------------                                             30, 000. 00
    Surveys and channel markings-----------                                        51, 469. 23
   Plant construction and betterments_                                             71, 048. 43
   Hydrographic surveys and office studies                                         88, 728. 91
    Sweeping channels and removing snags--------------------                       23, 000. 00

       Total maintenance_---------___-----_
                                      ----         _                            1, 194, 405. 52

       Total (including accounts payable) --------------------                  1,293, 290. 92
  Public Works Administration program.-The balance unexpended
of funds allotted from the National Industrial Recovery Act, and an
additional allotment of $60,000 made during July 1934, will be
applied as follows:
Accounts payable, June 30, 1934_------ -------------------                       $116, 398. 50

New work (by contract) :
   Dredging lower approach to Lock No. 41 (July 1 to November
     1934) -----------------------------------------                              134, 190. 73
   Bank revetment, Kentucky Peninsula (July 1 to October 1934)_                   227, 949. 34
   Bank revetment, Dutch Bend (July 1 to October 1934)- .---                      167, 609. 06

       Total for new work________----              ___-_____                      529, 749. 13
       Total (including accounts payable) -            -         _--- __----       646, 147. 63
                                        RIVERS           AND HIARBORS-OHIO                                   RIVER                                  931
  The additional sum of $2,200,000 can be profitably expended dur-
ing the fiscal year ending June 30, 1936, to be applied as follows:
New work :
   Dredging------------                                                                                    - --        -          --          $550, 000
   Construction of dikes and revetment_--                                                                                                      600,000
   Surveys and experimental studies-                                                                                                             50, 000

                Total for new work-_.                                      _      --          ----                   .........-              1, 200, 000
Maintenance:
    Dredging___-________                                                                                                                               000
                                                                                                                                               8-------00,
     Surveys and channel marking-                                                                                                                    000
    Dikes and revetment _                                                                                                                        10, 000
    Hydrographic surveys _                                                                                                                       75, 000
     Snagging-                                                                                                                                   15, 0'00

                Total maintenance                                                                            --                              1, 000, 000
                Grand          total____                                                                                                 -   2,200, 000

                                                    Cost and financial surnunary
                                          MAINTENANCE                  AND IMPROVEMENT                     FUNDS

Cost of new work to June 30, 1934                               216, 512. 87
                                                             $----------------------
Cost or maintenance to June 30, 1934 ----------------------- 9, 606, 255. 81
       Total cost of permanent work to June 30, 1934 .........                                                                         20, 822, 768. 68
Value of plant, materials, etc., on hand June 30, 1934-...                                                                             1, 828, 498. 47

       Net total cost to June 30, 1934_ _                                                                                              22, 651, 267. 15
Plus accounts receivable June 30, 1934                                                       --                            _              106, 809. 06

     Gross total costs to June 30, 1934 --                                                            --                          _2, 758, 076. 21
Minus accounts payable June 30, 1934-- -                                                                                               98, 885. 40

     Net total expenditures-.---------------------------                                                                               22, 659, 190. 81
Unexpended balance June 30, 1934                                                                                                         , 194, 481. 86
                                                                                                                                        1---------

                Total amount appropriated to June 30, 1934                                             ----------_                     23, 853, 672. 67

     Fiscal year ending June 30                            1930                        1931             1932                1933                1934


Cost of new work ________________$1, 355, 487. 60 $1, 962, 275. 94 $1, 161, 226. 03                                   $175, 226. 38           $165, 261. 47
Cost of maintenance-..--   ......    301, 454. 04     278, 860. 59     970, 922. 21                                  1, 633, 920. 77         1, 579, 382. 34

        Total cost ---------------                   1, 656, 941. 64           2, 241, 136. 53     2, 132, 148. 24   1, 809, 147. 15         1, 744, 643. 81

Total expended--------------                         2, 190, 469. 31           2, 284, 660. 99       937, 671. 51    1, 352, 374. 72         1, 421, 846. 02

Allotted. ----------------                          2, 367, 572. 13            2, 964, 334. 35     1, 270, 878. 99   3, 008, 602. 83           596, 438. 62


Balance unexpended July 1, 1933----------------------------       $2, 019, 889. 28
Amount allotted from War Department Appropria-
tion Act approved Feb. 23, 1927                     $45, 354. 04
Amount allotted from Emergency Relief and Con-
struction Act approved July 21, 1932                 10, 000. 00                 ------------
Amount allotted from War Department Appropria-
tion Act approved Mar. 4, 1933----------------   1, 194, 530. 31
                                                                   1, 249, 884. 35

      Amount to be accounted for---------------------------- 3, 269, 773. 61
Deductions on account of revocation of allotment and impounded
  funds
   J-tA." ---    - -   -   -    - -   - - - -   -   - - - - - -
                                                                 i653,.
                                                                  -
                                                                     445_ 7
                                                                       -       - - - -

                                                                                                                                --
                                            ...
            Net amount to be accounted for-_____                                                     ___.--          _---               21,616, 327. 88
      '
     Previous costs reduced $4,410.40, account adjustment of plant account.
932        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                         1934

Gross amount expended-----------------------$3, 521, 511. 85
Less-
    Reimbursements collected----- $1, 531, 902. 08
    Receipts from sales.__.......     567, 763. 75
                                                   2, 0009,665. 83
                                                                                                             $1, 421, 846. 02
      Balance unexpended June 30, 1934_            -_________________
                                                                  1, 194, 481. 86
Outstanding liabilities June 30, 1934 ____________  $139, 465. 95
Amount covered by uncompleted contracts--------      117, 184. 01
                                                                     256, 649. 96
     Balance available June 30, 1934___-----__________                                                          937, 831. 90
Accounts receivable June 30, 1934 ___                                                                           106, 809. 06
     Unobligated balance available June 30, 1934___________                                                   1, 044, 640. 96
Amount revoked during July 1934-----   -    -----_____________                                                     8, 000. 00
     Balance available for fiscal year 1935____________________                                               1, 036, 640. 96
Amount (estimated) required to be appropriated for completion
of existing project 1___        _________________                                                            4, 745, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1936 :
   For new work 1-----------------------------------------                                                    1, 200, 000. 00
   For maintenance 1_____________________________________                                                     1, 000, 000. 00
                 1
        Total                                    __------------------                                         2, 200, 000. 00

                                              PUBLICI WOKS FUND'S

Cost of new work to June 30, 1934             __ _______        $559, 487. 65
Cost of maintenance to June 30, 1934-------------------------------
      Total cost of permanent work to June 30, 19834 -----------                                                 559', 487. 65
Value of plant, materials, etc., on hand June 30, 1934__________                                                       763. 22

     Net total cost to June 30, 1934_______________________                                                      560, 250. 87
Minus accounts payable June 30, 1934_________________________                                                    116, 398. 50

      Net total expenditures__ ----------                                                     ____           -443,    852. 37
                                    ._
Unexpended balance June 30, 1934__---__------ ---------                                                          586, 147. 63

        Total amount appropriated to June 30, 1934_____________                                               1, 030, 000. 00


   Fiscal year ending June 30                 1930               1931             1932                1933               1934


Cost of new work     ...----------------------------     -------------- --------------------------                   $559, 487. 65
Cost of maintenance ...             .           .            .              .            ..                          .
Total expended       ----------------------                      --------------                --------------         443, 852. 37
Allotted----------------------                  ------------------              ----------- I------                 1, 030, 000. 00


Amount allotted from National Industrial Recovery Act ap-
proved June 16, 1933--------------          __----------------------   $1, 525, 000.00
Deductions on account of revocation of allotment---.........          _     495, 000. 00

        Net amount to be accounted for___                               ___---_____-------                    1, 030, 000. 00

  1 Exclusive of available funds.
                                  RIVERS          AND HARBORS-OHIO                            RIVER                             933
Gross amount expended_-__ _---_______                $454, 134.31
Less:
    Reimbursements collected-........    10, 277. 69
    Receipts from sales-- ---   ___---4.          25
                                                      $10, 281. 94
                                                                                                                      $443, 852. 37

      Balance unexpended June 30, 1934 __________________                                                              586, 147. 63
Outstanding liabilities June 30, 1934______________ 116, 398. 50
Amount covered by uncompleted contracts--------- 522, 609. 57
                                                                                                                       639, 008. 07
    Balance available June 30, 1934______________________                                                             -- 52, 860. 44
Amount allotted by Public Works Administration Emergency
Appropriation Act, fiscal year 1935__________________________                                                          60, 000. 00
            Balance available for fiscal year 1935_--_
                                                   ........-                                            __      -        7, 139. 56
        CONSOLIDATED COST AND FINANCIAL SUMMARY FOR OPEN                                             CHANNEL WORK,
                                    OHIO RIVER

Cost of new work to June 30, 1934____________________________ $11, 776, 000. 52
Cost of maintenance to June 30, 1934 1_____________________     9, 606, 255. 81
      Total cost of permanent work to June 30, 1934--__-       -___ 21, 382, 256. 33
Value of plant, materials, etc., on hand June 30, 1934_______ __     1, 820, 261. 69
      Net total cost to June 30, 1934_________________________                                                  23, 211, 518, 02
Plus accounts receivable June 30, 1934_______________________-                                                      106, 809. 06
      Gross total costs to June 30, 1934_____________________                                                   23, 318, 327. 08
Minus accounts payable June 30, 1934________________________                                                        215, 283. 90
     Net total expenditures___________________________                                                          23, 103, 043. 18
Unexpended balance June 30, 1934 ____________________________                                                    1, 780, 629, 49
            Total amount appropriated to June 30, 1934_____________                                             24, 883, 672. 67

    Fiscal year ending June 30                     1930              1931              1932              1933               1934


Cost of new work-----__-------$1, 355, 487. 60 $1, 962, 275. 94 $1, 161, 226. 03                     $175, 226. 38        $724, 749. 12
Cost of maintenance- ----------   301, 454. 04     278, 860. 59     970, 922. 21                    1, 633, 920. 77      1, 579, 382. 34

        Total cost ..--------------           1, 656, 941.64    2, 241, 136. 53   2, 132, 148. 24   1, 809, 147. 15      2, 304, 131. 46
Total expended- .---..---------- 2,190, 469. 31                 2, 284, 660. 99     937, 671. 51    1, 352, 374. 72      1, 865, 698. 39
Allotted..............-------------------..   2, 367, 572. 13   2, 964, 334. 35   1, 270, 878. 99   3, 008, 602. 83      1, 626, 438. 62



Balance unexpended July 1, 1933 _                                                              __ _____ _ $2, 019, 889. 26
Amount allotted from War Department Appropria-
tion Act approved Feb. 23, 1927----------------                                           $45. 354. 04
Amount allotted from Emergency Relief and Con-
struction Act approved July 21, 1932_____-                                                   10, 000. 00
Amount allotted from War Department Appropria-
tion Act approved Mar. 4, 1933---------------    1,                                       194, 530. 31
Amount allotted from National Industrial Recovery
Act approved June 16, 1933__-----------------1,                                           525, 000. 00
                                                                                                                 2, 774, 884. 35
     Amount to be accounted for----------- __          ___                                                __-   4, 794, 773. 61
Deductions on account of revocation of allotments.-__-    __                                                    1, 148, 445. 73
           Net amount to be accounted for---------------------                                                  3, 646, 327. 88

   1 Previous costs, reduced $4,410.40, account adjustment of plant account.
934        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

Gross amount expended--------------------$3, 975, 646. 16
Less-
    Reimbursements collected ----- $1, 542, 179. 77
    Receipts from sales-----------     567, 768. 00
                                                    2, 109, 947. 77
                                                                                                                $1, 865, 698. 39

      Balance unexpended June 30, 1934   -------------------                                                     1, 780, 629. 49
Outstanding liabilities June 30, 1034___         $255, 864. 45
Amount covered by uncompleted contracts--------   639, 793. 58
                                                                                                                   895, 658. 03

      Balance available June 30, 1934-----------------------                                                       884, 971. 46
Accounts receivable June 30, 1934---------------------------                                                       106, 809. 06

     Unobligated balance available June 30, 1934--------------                                                     991, 780. 52
Amount allotted from Public Works Administration Emergency
Appropriation Act fiscal year 1935-------------------------                                                        60, 000. 00

     Balance --------------------------------                                                                    1, 0151, 780. 52
Amount revoked during July 1934--------------------------                                                   -          8, 000. 00
        Balance available for fiscal year 1935------------------1, 043, 780. 52

Amount (estimated) required          to- be appropriated for completion
                                         - - - - - - - - - - - - - - - - - ---- -
of existing project 1- - - - - - - --                                                                           4, 745, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1936-- 1- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
   For new work                                                                           1, 200, 000. 00
      For maintenance 1-            - - - ----         - -   - - - - -- - - - - - - - - - - - - - - - - -
                                                                                                                 1, 000, 000. 00
                1-   - -- - - - -    - -         - -   - - -- - -- - -- -- - -- - -- - -- - -- - --
        Total                                                                                                    21,200, 000. 00

  4. OPERATING SNAG BOATS ON THE OHIO RIVER BELOW THE
                                    PENNSYLVANIA                    STATE LINE

   The improvement for which report is made under this caption is
an outgrowth of the project for improving Ohio River (general im-
provement) for which report is made on page 927 of this report,
where general information regarding the improvement can be found.
The cost of removing snags, wrecks, and other obstructions on the
Ohio River was borne by the appropriation for general improve-
ment until 1890, when the River and Harbor Act of September 19,
1890, authorized an annual expenditure of not to exceed $25,000 for
removing snags, wrecks, and other obstructions in the Ohio River.
This amount was increase to $50,000 by section 3 of the River and
Harbor Act of June 3, 1896.
   Operations and results during the fisc'a year.-No work was done
under this allotment, necessary snagging being carried out with
funds provided from the allotment for open channel work.
   Condition at end of fiscal year.--Owing to natural causes snags are
continuously being deposited in the river, rendering continuous work
necessary to provide an unobstructed channel for navigation. No
statement can be made of the proportion of the work accomplished.
The operation of plant in connection with open channel work pro-
vided a reasonably clear channel at the end of the fiscal year.
   The total amount expended from funds allotted under section 3
of the River and Harbor Act of June 3, 1896, to the end of the fiscal
year 1934 was $1,594,346.38.
   1 Exclusive of available funds.
                  RIVERS AND IIARBORS-PITTSBURGH,                                            PA., DISTRICT                     935
   Proposed operation.-Operationsunder this project will be car-
ried out under allotments from appropriations made available for
such purposes.
                                             Cost and financial summary
Cost of maintenance to June 30, 1934_________________________                                                 $1, 594, 346. 38
Net total expenditures    ----------------------------                                                          1, 594, 346. 38
Unexpended balance June 30, 1934                                                                                     8, 638. 75
            Total amount appropriated to June 30, 1934                                      _--------           1, 602, 985. 13

           Fiscal year ending June 30                          1930           1931            1932          1933             1934

Cost of new work-------------------
Cost of maintenance-----------------------                  $38, 016. 72   $49, 361. 82   $50, 000. 00   $41, 211. 19     -_-_      -"-
Total expended----------------------____________________     45, 792. 35    40, 621. 60    48, 420. 97    43, 705. 75         $49. 06
Allotted__                                              50, 000. 00
                _________----------------___________------------_           38, 189. 10    38, 692. 93    48, 082. 53-

Balance unexpended July 1, 1933--------    ----- ___                                                                     $8, 688. 51
Deductions on account of revocation of impounded funds----------                                                                . 70
      Net amount to be accounted for_________-_______________                                                             8, 687. 81
Gross amount expended------------------------------------------                                                               49. 06
            Balance unexpended June 30, 1934_                                                                             8, 638. 75
IMPROVEMENT OF RIVERS AND HARBORS                                                                                  IN THE
         PITTSBURGH, PA., DISTRICT
  This district includes the watershed of the Ohio River above mile
109, between Captina Island and Powhatan Point, a distance of 109
miles, and includes Emsworth and Dashields Dams and Dams Nos.
4 to 13, inclusive. The rivers included in this district are the Mo-
nongahela, Pa. and W. Va., the Allegheny, Pa. and N. Y., Youghio-
gheny River, Pa., tributaries not now under improvement, and the
upper Ohio for 109 miles below its head at Pittsburgh, Pa.
    District engineer: Maj. W. D. Styer, Corps of Engineers.
   Division engineer: Lt. Col. R. C. Moore, Corps of Engineers, act-
ing division engineer to July 28, 1933; Col. George R. Spalding,
Corps of Engineers, as division engineer from July 29 to November
27, 1933; Lt. Col. E. L. Daley, Corps of Engineers, from November
28 to November 30; and Lt. Col. R. G. Powell, Corps of Engineers,
since that date.
                                                           IMPROVEMENTS

                                                            Page                                                              Page
1. Monongahela River, Pa. and                                          6. Ohio River above mile 109,
    W. Va_-------------------     936                                       construction of locks and
2. Operating and care of locks                                             dms___ _-----___-__ ___                             915
     and dams, Monongahela                                              7. Operating and care of locks
    River, Pa. and W. Va- ..      940                                        and dams at Emsworth
3. Allegheny River, Pa., open-                                               and Dashields, and nos.
    channel work___---         -941                                          4 to 13, inclusive, Ohio
                                                                            River-------------------                           925
4. Allegheny River, Pa., con-                                           8. Ohio River, open-channel
     struction of locks and                                                  work -                                           " 927
    dams ______    ________                                  942       9. Youghiogheny River, Pa..                             950
5. Operating and care of locks                                        10. Tygart River Dam, W. Va_                             951
    and dams, Allegheny River,                                        11. Examinations, surveys, and
       Pa            -                        ___
                                               __            948                contingencies (general)__                        953
936    REPORT OF CHIEF OF ENGINEERS,       U.   S. ARMY,   1934

             1. MONONGAHELA RIVER, PA. AND W. VA.

   Location.-This river is formed by the junction of the Tygart and
West Fork Rivers, about 1 mile south of Fairmont, W. Va., and
flows in a northerly direction 128 miles to its junction with the
Allegheny River, forming the Ohio River at Pittsburgh, Pa. (See
U. S. Geological Survey Charts for Pennsylvania and West Vir-
ginia.)
   Previous projects. Adopted by the act of June 10, 1872, and ex-
tended by the acts of June 3, 1896, and June 4, 1897. Under these
projects, all completed, the cost and expenditures were $5,420,540.52
for new work and $741.66 for maintenance, a total of $5,421,282.18.
For further details see page 1910 of Annual Report for 1915.
   Existing project.-This provides for the improvement of the river
by 14 locks and dams to afford slack-water navigation from Pitts-
burgh, Pa., to 4 miles above Fairmont, W. Va., a distance of 131
miles. Original Locks Nos. 1 to 7, inclusive, were built by the Mo-
nongahela Navigation Co. and acquired by the United States in
1897, and Locks 8 to 15, inclusive, were built by the United States
prior to 1904. Locks 7, 8, and 9 are replaced by new Locks 7 and 8.
Increased traffic necessitated an enlargement and improvement of the
locks and dams between Pittsburgh and Rices Landing, Pa. In re-
building the locks and dams from nos. 1 to 6 the adopted standard
was two parallel chambers each 56 by 360 feet, with 8 feet depth
on sills and fixed concrete dams. New Locks Nos. 7 and 8 are single
chambers 56 by 360 feet.
   The project includes the building of Locks 10 to 15, inclusive,
single locks, 56 by 182 feet, with 7 feet depth on sills, and fixed
concrete dams, which are still adequate for the present traffic. The
channel width varies from 125 feet in pool no. 15 to 500 feet in pool
no. 1.
   The existing project was authorized as follows:
   Enlargement and improvement of Lock and Dam No. 6, additional
works at Lock No. 3, and for new repair steamer and new dredge
boat with equipment, by the act of March 3, 1899, at an estimated
cost of $185,556 (see Annual Report of the Chief of Engineers for
1897, pp. 2423-2424) ; also acquisition of land and additional im-
provements at nos. 5 and 6, authorized by the act of March 3, 1905,
at a cost of $7,850 (see Annual Report for 1904, p. 460).
   Rebuilding of Lock and Dam No. 2, by the act of June 13, 1902,
" in accordance with the report submitted by the engineer in charge,
dated February 4, 1902 " (not printed), at an estimated cost of
$655,961; estimate increased in 1910 to $698,961. (See Annual Report
for 1909, p. 1756.)
   Rebuilding of Lock and Dam No. 3 by the act of March 3, 1905, at
an estimated cost of $589,196 (H. Doc. No. 209, 58th Cong., 2d sess.).
   Reconstruction of Lock and Dam No. 5, by the act of March 2,
1907, at an estimated cost of $756,042 (H. Doc. No. 209, 58th Cong.,
2d sess.).
   Reconstruction of Lock and Dam No. 6, by the act of March 4,
1913, at an estimated cost of $356,400 (H. Doc. No. 1217, 62d Cong.,
3d sess.); estimate increased in 1916 to $418,860.
               RIVERS        AND   HARBORS-PITTSBURGH,                                  PA.,   DISTRICT               937

  Additional improvements by the act of September 22, 1922
(H. Doc. No. 228, 67th Cong., 2d sess.), at estimated costs as follows:
Guide walls and guard walls, nos. 1 to 6------------------------       $1,255, 130
Lengthening land chamber of Lock No. 3 to 720 feet----------------        787, 722
New chamber (360 feet long), Lock No. 4---6---------------------           99, 786
Lock and Dam No. 71--------------------,-------                ----- -    161, 241
Lock and Dam No. 8---------------------------------------               1,165, 758
Lock and Dam No. 7 (second chamber) -------------------------             419, 126
Lock and Dam No. 8 (second chamber) --------------------------            504, 465
Reconstruction of Dam No. 4--       -------------------------------       397, 211
Marine ways, repair plant, office, and warehouse-----------------         250, 000

         Total ---                                                                                                6--------------6--------
                                                                                                               66,640,  439
   The act of July 3, 1930, modified the existing project so as to
provide for the construction of new locks and dam about 21/2 miles
below the existing structure, at an estimated cost of $2,175,000, in
lieu of the work authorized at old Lock and Dam No. 4 (Rivers
and Harbors Committee Doc. No. 22, 70th Cong., 2d sess.). A con-
gressional amendment approved January 31, 1931, provided "that
the Chief of Engineers may, in his discretion, locate the new locks
and dam above the existing structure and on such site as he may
deem most desirable " (Public Resolution 117, 71st Cong., 3d sess.).
   The total estimated cost of new work, revised in 1930, is $12,500,-
000, exclusive of amounts expended on previous projects.
                   Locks and dams, Monongahela River, Pa. and W. Va.

                                                                              Depths on miter
                  Location                   Dimensions                        sills at normal Character of foundation
                                                                                  pool level
                                                                 Lift at
No.                                                              normal
                                            Width    Avail-        pool
      Miles                                            able       level
      above         Nearest town            cham-    length                   Lower      Upper          Lock       Dam
      mouth                                  ber     for full
                                                     width


                                            Feet         Feet        Feet      Feet       Feet
1       1.9   Pittsburgh, Pa---------        156          360         7.4      10.0       12. 0   Rock____      Rock and
                                                                                                                  gravel
2     11. 2   Braddock, Pa ...-..-            56          362         8.3      11. 6      12. 1   Gravel        Gravel.
3     23.8    Elizabeth, Pa ____--            56         720          8.2      11.9       12.1    Rock           Do.

4     41. 5   Charleroi, Pa            _    1 56    {    360    }    10.6      10. 9      14. 1 Gravel -      Do.
5     56. 5   Brownsville, Pa ..----         1 56        360         12. 4     11. 6      12. 0 Rock ..--     Do.
6     68. 3   Rices Landing, Pa _--          1 56        360         13. 1     10. 7      11.8 -- _do     -- Rock and
                                                                                                               gravel.
7     84. 8   Greensboro, Pa--------          56         360         15. 0     10. 5      11. 0 Rock and Rock and
                                                                                                    fire clay, fire clay.
8      90. 6 Point Marion, Pa_ --             56         360         15.0      10. 5      11.0    --
                                                                                                    do .---.   Do.
10     101. 5 Morgantown, W. Va___             56         182         10. 2      7. 4            _ do
                                                                                            8.0 --         ..- Do.
11     104. 1 Uffington, W. Va.------          56         182         10. 7      6. 9       8.0 -- do .--      Do.
12     109. 1 Little Falls, W. Va --.          56         182         10. 7      7. 0       8.0 -- _do__ -     Do.
13     111.6 _____do____----..-.--    .        56         182         10. 7      7. 0       8.0 -- _do-._--    Do.
14     115. 0 Lowsville, W. Va ...-            56         182         10. 7      7. 0       8.0 - __do ..- -   Do.
15     124. 2 Hoult, W. Va----------           56         182         10. 7      7. 0       8. 0 -- do ...     Do.

1 2 chambers.
938             REPORT OF               CHIEF OF ENGINEERS,                            U.     S. ARMY,             1934

              Locks and dams, Monongahela River, Pa. and W. Va.-Continued

                                               Type of construction                              Percent-Year o
           Kind of                                                                                 age of       ear oEstimated or
No.          dam                                                                                 comple- completionactual cost
                                     Lock                               Dam                        tion

1        Fixed -.. -.         Concrete-----------.            Timber and concrete-----           ..---    100    1932       $971, 244. 27
2     ---- _do------ ---- do-- ....---------- Concrete..------------------..                              100    1927         905, 098.44
3     ---.. do ----- --- do                      -                         .--------------------           98              1, 681,538.00
4     ---- do---------o------------                do-do --            .-------------------                99 --------   2 2,145, 000.00
5     ---    do-------do--..-------------do-----                                  --------------          100    1927      1,074,812.00
6       --- do----------do----------                          Timber and concrete-------                   99 --------        769, 507.04
17    ----    do . -----. do----------_                        Concrete------------------                   98 -------    22, 637, 750.00
18     - -do       .-----...---...  do ...-------                 do....          .--------                 991-------    2 2, 083, 514. 23
10      ---- do ---------.          do---------- ----             do--------------------                   100    1903         210, 444. 64
11     -....dodo           ---      do ....             __        do -------------                      -. 100    1903         227, 668. 41
12    -- __do ...-..--                                       --   do ------------------                    100    1904         200, 550.35
13    ---- do ..--           .      do ---- -            ---      do          ------------------           100    1904         190, 690. 51
14        --_do -------        do        ---------
                                          _do                        --         -      -------          - 100     1904         210, 126. 87
15    --. -do----------...do ---------------                      do-----------100                                1904         175, 828.52


1 Practically completed.
2 Estimated.

Marine ways, etc       --------------------------------------- $250, 000.                                                              00
Abandoned Lock and Dam No. 4___---------------------------       780, 816.                                                             00
Abandoned Lock and Dam No. 8       ----------------------------- 245, 900.                                                             00
Abandoned Lock and Dam No. 9--------------------------------     191, 000.                                                             00
Partial cost of worn-out and abandoned Locks and Dams Nos.
  1 to 7, inclusive, and franchise-------------------------- 2, 744, 501.                                                              17
   Terminal facilities.-Boat landings are maintained by municipali-
ties along the- river.
   A large number of tipples at mines and hoists of various types at
manufacturing plants are maintained for private use in loading and
unloading coal, coke, billets, steel, sand, gravel, oil, acid, etc., but
these are not available for the purpose of general commerce. Exist-
ing private terminals are adequate for shipment and receipt in the
Pittsburgh district of the type of commerce now in existence. The
Glassport terminal of the American Barge Line Co. affords facilities
for limited commerce beyond the capacity of the packet boats not
handled through private terminals. The provision of river-to-rail
and rail-to-river transfer terminals on an extensive scale is not im-
portant, since 98 percent of traffic using the river passes through
private terminals, which are more than adequate for the prospective
commerce.
   Operations and results during fiscal year.-At Lock No. 4 con-
struction under contract of an extension to the upper guard wall and
of a spur dike upstream from the existing upper guide wall was
commenced on May 25, 1934. The connecting monolith between the
guard wall and the extension was completed. Three hundred and
twenty feet of crib foundation were built, and one section, 120 feet
in length, was sunk in place.                                 All steel piling for the spur dike was
driven to final grade and the bottom wales bolted in place.
  At Lock No. 7 an extension to the upper guard wall, 165 feet in
length, of cellular steel sheet piling construction, was completed by
hired labor.
   The total costs were $51,176.09, all for new work. The total ex-
penditures were $50,182.17.
  Condition at end of fisal year.-The project is about 99 percent
complete. Fourteen locks and dams are in operation, furnishing
                RIVERS AND HARBORS-PITTSBURGH,                                           PA.,       DISTRICT                      939
slackwater navigation from Pittsburgh, Pa., to a point 4 miles above
Fairmont, W. Va., a distance of 131 miles. The controlling depth
between Pittsburgh and Dam No. 10 is 8 feet, and above Dam No.
10, 7 feet. Further information relating to the locks and dams may
be found under the table in paragraph Existing project. The river
is navigable throughout the year except for about 5 days annually
on account of high water and ice below Lock No. 7 and for 30 days
annually above Lock No. 7. The total costs of the existing project to
the end of the fiscal year were $10,271,926.83, all for new work.
The total expenditures under the existing project to the end of the
fiscal year were $10,265,981.50.
   Proposed operations.-The balance unexpended will be applied as
follows:
Accounts payable.------------------------                ------ $5,.945. 33
Maintenance :
    Extending upper guard wall, Lock No. 4, by contract (July 1,
      1934, to Nov. 1, 1934) ___---------------- __ ---- -_      120, 000. 00
    Balance remaining -----------------------------        ----- 36, 175. 59

          Total--_        -------------------                                                                        162, 120. 92
  No operations are contemplated during the fiscal year 1936, and
no funds can be profitably expended.
                                            Cost and financial summary
Cost of new work to June 30, 1934---------------------- $15, 692, 467. 35
Cost of maintenance to June 30, 1934------------------------      741.66
     Total cost of permanent work to June 30, 1934---------- 15, 693, 209. 01
Minus accounts payable June 30, 1934------------------------       5, 945.33
     Net total expenditures----------------------------                                                         15, 687, 263. 68
Unexpended balance June 30, 1934 _------                                                                            162, 120. 92
          Total amount appropriated to June 30, 1934------------                                                15, 849, 384. 60

   Fiscal year ending June 30                   1930            1931              1932                   1933                1934


Cost of new work--..._- ...        $126, 680. 83        $512, 777. 27        $1, 527, 907. 10       $288, 713. 15             $51, 176. 09
Cost of maintenance----------.-------- ----------------              -----------------    ----------------           I--------------
Total expended------------             -     138, 072. 57     338, 989. 50    1, 688, 734. 56         281, 438. 60          50, 182. 17
Allotted...---------------      ----       -700,000. 00     1,578, 500. 00      450, 000. 00          280, 985. 41         146, 922. 92


Balance unexpended July 1, 1933____                                                                                  $65, 380. 17
Amount allotted from War Department Appropriation Act ap-
proved July 14, 1932_                                                                                               147, 000. 00

      Amount to be accounted for_                                                                                    212, 380. 17
Deductions on account of impounded funds revoked----                                                                       77. 08

      Net amount to be accounted for__           _                                                                   212, 303. 00
Gross amount expended ___________________                                         _ $53, 045. 47
Less reimbursements collected ________-____-__--                                      2, 863. 30
                                                                                                                      50, 182. 17

         Balance unexpended June 30, 1934____                                  ______                                162, 120. 92
Outstanding liabilities June 30, 1934- ------ __                                       $4, 810. 25
Amount covered by uncompleted contracts ------                                         88, 596. 63
                                                                                                                      93, 406.88

         Balance available June 30, 1934 __________________                                                           68, 714. 04
940         REPORT         OF CHIEF OF ENGINEERS,                            U.    S. ARMY,           1934

2. OPERATING AND                      CARE OF LOCKS AND DAMS,                                 MONONGAHELA
                                       RIVER, PA. AND W. VA.

   The improvement forms part of the project for Monongahela
River, Pa. and W. Pa. See pages 936 to 939. The completed locks
and dams have been operated and maintained under the permanent
indefinite appropriation as follows: Nos. 1 to 6, since July 7, 1897;
no. 7, since November 11, 1925; no. 8 since October 12, 1925; no. 10,
since December 7, 1903; no. 11, since December 17, 1903; no. 12,
since December 19, 1903; no. 13, since January 4, 1904; no. 14, since
December 28, 1903; and no. 15, since December 23, 1903. Operation
of no. 4 was discontinued, and operation of new no. 4 commenced
on October 10, 1932.
   Operations and results during fiscal year.--All structures were
operated and maintained in serviceable condition throughout the
year. The total costs of operation and maintenance during the
fiscal year were $485,942.96. The total expenditures during the year
from the permanent indefinite appropriation amounted to $407,893.71.
   Condition at end of fiscal year.-The 14 locks and dams are in
serviceable condition. The head of navigation is at a point 4 miles
above Fairmont, W. Va. For controlling depths and conditions of
locks and dams see Monongahela River, Pa. and W. Va., pages
936 to 939 of this report. The total cost of operation and mainte-
nance to the end of the fiscal year was $19,219,495.74. The net total
amount expended from. the permanent indefinite appropriation to
the end of the fiscal year was $19,819,714.56.
   Proposed operations.-The locks and dams will be operated and
maintained under allotments from appropriations made available for
such purposes.
                                          Cost and financial summary

Cost of maintenance to June 30, 1934______------- ----                                              $19, 219, 495. 74
Value of plant, materials, etc., on hand June 30, 1934----------                                         611, 518. 08

      Net total cost to June 30, 1934---------------------                                            19, 831, 013. 82
Plus accounts receivable June 30, 1934----------------------                                               33, 027. 33

     Gross total costs to June 30, 1934 __________________                                            19, 864, 041. 15
Minus accounts payable June 30, 1934_____________________-                                                 44, 326. 59

     Net total expenditures-------------------------------19,    819, 714. 56
Unexpended balance June 30, 1934_______     -        -__-_______ 119, 959. 35
           Total amount appropriated to June 30, 1934___________                                      19, 939, 673. 91

   Fiscal year ending June 30                1930                  1931        1932            1933            1934


Cost of new workex-end-..
                     -.. - --.---                         --..--   -
Cost of maintenance__----------- $856, 540. 25             $939, 115. 63    $819, 979.94    $571, 697. 79    $485, 942. 96
Total expended----------------             942,714. 76       901, 394. 40    709, 711. 23    414, 308. 88     407,893 71
Allotted       ..----------------------    900, 000. 00      925, 000. 00    843, 879.99     360, 155. 42     262, 226. 07
           RIVERS AND HARBORS-PITTSBURGH,                  PA.,       DISTRICT             941
Balance unexpended July 1, 1933____      ._________      --
                                                      ______       $265, 626. 99
Amount allotted from permanent indefinite appropriation, sec-
  tion 6, River and Harbor Act, Mar. 3, 1909     -__-
                                                  _         -______ 325, 000. 00
     Amount to be accounted for-     -____--------_,
                                                   _ ____                           590, 626. 99
Deductions on account of impounded funds revoked ----------                          62, 773. 93
      Net amount to be accounted for---_---________---   ____                       527, 853. 06
Gross amount expended ----------------------           $907, 516. 50
Less-
    Reimbursements collected- --  __ $481, 811. 56
    Receipts from sales_-_______-_         17, 811. 23
                                                        499, 622. 79
                                                                                    407, 893. 71
      Balance unexpended June 30, 1934_ .....             __            -___        119, 959. 35
Outstanding liabilities June 30, 1934___-----___-       --
                                                     __-__          ____-            68, 682. 60
      Balance available June 30, 1934__.........               __        -__-        51, 276. 75
Accounts receivable June 30, 1934.__.---------------__-                         -    33, 027. 33
    Unobligated balance available June 30, 1934- -.   __..                           84, 304. 08
Amount allotted for fiscal year 1935_____..     -_____-_____-                       590, 000. 00
Balance available for fiscal year 1935_-------_____________             __          674, 304. 08

           3. ALLEGHENY RIVER,           PA.-OPEN-CHANNEL WORK

   Location.--This river rises in northern Pennsylvania, flows north-
westward into New York, and thence southward to Pittsburgh, Pa.,
where it joins with the Monongahela River to form the Ohio. Its
length is 325 miles. (See U. S. Geological Survey Charts of Penn-
sylvania and New York, unnumbered.)
   Emisting project.-This provides for improvement of the open
channel from the mouth to the New York State line, 214 miles, by
the removal of boulders and snags and the construction, where
needed, of low dams and dikes to close secondary channels and con-
centrate the low-water flow on shoals. The existing project was
authorized by the following river and harbor acts: The act of March
3, 1879, provided for channel clearing and low dams and dikes from
the mouth to French Creek (H. Ex. Doc. No. 21, 46th Cong., 3d
sess., reprinted in the Annual Report for 1879, p. 1371); and the
act of August 2, 1882, extended similar improvement from French
Creek to the New York State line (S. Ex. Doc. No. 89, 46th Cong.,
2d sess.). The original approved (1879) estimate for work from
the mouth to mouth of French Creek, 126 miles, was $51,425, and
the approved (1880) estimate for extension of the work from French
Creek to New York State line, 88 miles (214 miles from the mouth),
was $40,000; total, $91,425, all of which was for new work.
   The latest (1928) approved estimate for annual cost of mainte-
nance, is $5,000. The latest published map is in House Document
No. 740, Sixty-third Congress, second session.
   Terminal facilities.-The terminal facilities consist of boat land-
ings along the river. Privately maintained terminals adequate to
the needs may be relied on to develop with the increase in commerce.
   Operations and results during fiscal year.-None.
942            REPORT          OF     CHIEF OF ENGINEERS,                      U.          S.   ARMY,          1934


   Condition at end of fiscal year.-The existing project was com-
pleted in 1898. Of the 10 constructed low dams and dikes, those at
Six Mile and Nicholson Islands and the 2 Cowanshannock dikes have
been permanently eliminated by the extension of slack water from
the mouth of the river to Rimerton. The latter two have been re-
moved. The remaining open-channel structures, while much de-
teriorated, still perform their functions. There has been established
a well-defined channel from 150 feet wide and 1 foot deep at low
water at the New York State line to about 200 feet wide and 11/2 feet
deep at low water at the head of Pool No. 8, Rimerton, Pa. Slack-
water improvements from the mouth to Rimerton, Pa., have reduced
the open-channel improvement by 61 miles. For locks and dams
completed, see report on construction of locks and dams. The total
cost of the existing project to the end of the fiscal year was $330,-
839.89, of which $197,000 was for new work and $133,839.89 for main-
tenance. The total expenditures under the existing project are
$330,839.89.
  Proposed operations.-None contemplated for the fiscal years 1935
and 1936.
                                           Cost and financial sum mary

Cost of new work to June 30, 1934___                                                                                $197, 000. 00
Cost of maintenance to June 30, 1934----------------------------                                                     133, 839. 89
      Total cost.of permanent work to June 30, 1934---                                                               330, 839. 89
Net total expenditures-------------------------- ---------------                                                     330, 839. 89
Total amount appropriated to June 30, 1934__ -------------------                                                     330, 839. 89

           Fiscal year ending June 30                    1930          1931                 1932             1933             1934

C ost of new w ork -...........      ... ...-              ......                  -....
Cost of maintenance............--------------   -----
                                                 ..   $2, 943. 94    $4, 321. 66      $3, 025. 43      ___    _____---1   _
Total expended-......          .................        2,943. 94    4,321. 66             3,025. 43
Allotted                    ..-----------------------
                 __.....------                          3, 000. 00    2, 500. 00     -2, 000. 00 .........


   4. ALLEGHENY RIVER, PA.-CONSTRUCTION OF LOCKS AND DAMS
   Locastion.-See report on Allegheny River, Pa., open-channel
improvement.
  Existing project.-This project provides for 8 locks and dams
establishing a least slack-water depth of 9 feet in the lower 61 miles
of the river. After dredging a 9-foot channel with a 200-foot width
below Lock No. 2, Lock and Dam No. 1 are to be eliminated.
   The estimate of cost for new work, revised in 1930, is $14,346,126.82.
No estimate-for maintenance was made.
  The existing project was authorized by the following river and
harbor acts: The act of August 5, 1886, provided for Lock and Dam
No. 1 (Annual Report for 1886, p. 1545, which contemplated a fixed
dam); on September 29, 1891, the Secretary of War authorized the
change to a movable dam (Annual Report for 1891, p. 2366) ; the act
of June 3, 1896, provided for Locks and Dams Nos. 2 and 3 (Annual
Report for 1896, p. 2214) ; the act of July 25, 1912, provided for
Locks and Dams Nos. 4 to 8, inclusive (H Doc. No. 540, 62d Cong.,
2d sess.).
   The act of July 3, 1930, modified the existing project so as to pro-
vide for a depth of 9 feet in the lower 61 miles; for the replacement
                  RIVERS             AND HARBORS-PITTSBURGH,                                     PA.,        DISTRICT                   943

of Lock and Dam No. 1 by a dredged channel 9 feet deep and 200
feet wide up to Lock No. 2; and for the modification of Locks and
Dams Nos. 2 and 3 by the construction of a standard lock (56 by 360
feet) riverward of the present locks, the deepening and otherwise
improving of the existing locks, the protection of Dam No. 2, and
the raising of Dam No. 3 to its original elevation, or 11/2 feet higher
than at present, at a total estimated cost of $3,615,000. Provided,
that the Secretary of War, after further investigation, may substi-
tute a single high dam for the two low dams, with two standard lock
chambers, at an estimated cost, including the cost of dredging below
Dam No. 2, of $4,498,)00 (H. Doc. No. 356, 71st Cong., 2d sess.).

                      Looks and Dams Nos. 1 to 8, inclusive, Allegheny River

                                                                                       Depth on miter
                      Location                            Dimensions                   sills at normal Character of foundation
                                                                                          pool level
                                                                           Lift   at
N .                                                                        normal
                                                         .Width Avail-      pool
      Miles                                                       able      level
      above                Nearest town                   chamo  length                Lower       Upper         Lock                Dam
      mouth                                                ber  for full
                                                                 width


                                                          Feet     Feet      Feet       Feet        Feet
1        1.7       Pittsburgh, Pa        _                 55       286       7. 0      8. 0        15. 0 Gravel ..              Gravel.
12        6. 7      Aspinwall, Pa----------                 56       360      18. 0     12. 25       11. 0 Rock-....              Rock.
2        7.0    ---- do----------------                    56       291      11.0      11.0         10.0 ._do-....               Gravel.
13       14. 7     Cheswick, Pa_______ __                   56       360      12. 0     10. 8        10. 5 -___do__-..             Do.
3       16. 7      Springdale, Pa---_                      56       289      10. 5      7.0          6. 5 Hardpan..               Do.
4       24.0       Natrona, Pa...------------              56       360     13. 5       7. 5         9. 0 Rock .___              Rock.
5       30. 5      Freeport, Pa .--------                  56       360     12. 0      11. 0        11. 0 Gravel....             Gravel.
6       37. 0      Glen Irwin, Pa .......                  56       360     12. 0      11.0         11. 0 Rock .....              Do.
7       46. 0      Kittanning, Pa         ------           56       360     13. 0      10. 0        11.0 Gravel_,-                Do.
8       53. 3      Templeton, Pa ... ....                  56       360     15. 0      10. 5        11. 0 R ock       -...       Rock.


                                                  Type of construction                           Percent-
No. Kind of dam                                                                                   age o of    Yearcom-
                                                                                                                  Estimatedor
                                                                                                 comple- of coon          actual cost
                                       Lock                            Dam                         tion    pletion


1    M ov ab le ..   __                    --
                               Concrete .-- . . . . C han oine wicket ..........                      100      1902           2   $591, 187. 42
12    Fixed .......                 do .      .      .      Concrete----                                90                    1, 800, 000. 00
2 - .do-       .....----         do                                     -do
                                                                    _------------                     100    1908              2 544, 928.85
13 .....do......-_-------      -do                         -           do............                  5-0 -                  1,750,000.00
3 .--. do__-_____--__-do__                                     Timber crib--________----_            100    1904              2 310,103.36
4 -.    do _____..----           do               -            Concrete-----_______ -__              100    1933             1, 603, 000. 00
5 -_,do------              --- do---------------do-------------------                                99- . ---               1,794,133.93
6 ___do--------.do                                                    do_                             99 -        -          1, 772,178.00
7 -- ___do.---------            do -         -      -        -        do ......- --  - -              98 ........            1,720, 000.00
8 .--   do-                     do --
                     ..----- ..-----                                   do_                             98 --    --            2, 469, 442.82

             Total         ....--    ...------------------------                  ------------           ..-------        14, 354, 974. 38

IUnder construction.
2 Actual cost.
NOTE.-When Dam No. 3 is raised to original elevation (733) the minimum depth on lower miter sill at
Dam No. 4 will be 9.5 feet.


     Recommended modifications of project.-Under date of January
15, 1931, the Chief of Engineers recommended modification of the
existing project so as to provide for extending a dependable 9-foot
navigable depth to East Brady, by raising the pool o,f Dam No. 8
         91536-ENo 1934                       60
944    REPORT OF CHIEF OF ENGINEERS,         U. S. ARMY,   1934


by 10 feet, by means of movable crest gates, and constructing Dam
No. 9 with an initial lift of 15 feet, subject to the provision that the,
Chief of Engineers may, in his discretion, modify the plan for im-
provement by constructing two new locks and dams without raising
the pool of Dam No. 8; all at an estimated cost of not to exceed
$3,800,000 with not to exceed $74,000 annually for operation and
care (H. Doc. No. 721, 71st Cong., 3d sess.).
   Under date of January 24, 1934, the Chief of Engineers recom-
mends that the project recommended in House Document No. 721,
Seventy-first Congress, third session, be modified so as to provide for
 (1) the raising of existing Lock and Dam No. 8 by the fixed addi-
tion of 3 feet in height; (2) the construction of Lock and Dam No.
9 at mile 62.85 with an upper pool elevation of 822, a single chamber
lock, size 56 by 360 feet, with river lock wall so constructed as to
serve as the middle wall of a twin lock plan; and (3) the dredging of
a suitable channel at the head of Pool No. 8, all at an estimated
initial cost of $2,642,000 and $96,000 annually for maintenance and
operation. The details of the plan of improvement, including the
exact location of Dam No. 9 and the exact pool elevations be left to
the discretion of the Chief of Engineers (Rivers and Harbors Com-
mittee, Doc. No. 27, 73d Cong., 2d sess.).
   Local cooperation.-Fully complied with.
    Terminal facilities.-Tipples and numerous hoists are privately
maintained for use in loading and unloading coal, coke, sand, gravel,
and manufactured articles. The transshipment of freight between
river and railroads is handled at privately owned river-to-rail band
and gravel hoists.
   Operations and results during fiscal yea--Regular funds.-At new
Lock and Dam No. 2, 58,200 cubic yards of rock excavation and
12,700 cubic yards of common excavation were removed from the
site of the lock. The lock walls and sills were completed except
for the final pour on the upper guard and miter sills. The installa-
tion of lock-wall piping, lock gates, lock-operating machinery, and
penstock pipe was completed. The pouring of concrete for the power
house was completed and power-plant machinery and equipment
were 97 percent installed.
    Eighty-five thousand five hundred cubic yards of common excava-
tion and 3,200 cubic yards of rock excavation were removed from the
dam site. The pouring of concrete for the abutment and first two
sections of the dam was completed except for one-half of the final
course on each monolith. In the third section base pours were made
for the remaining 16 monoliths. The lock and dam are 89.8 percent
complete.
    Twenty-one thousand eight hundred cubic yards of rock and 11,800
cubic yards of sand and gravel were dredged by contract from the
lower approach to the lock.
    At new Lock No. 3, 29,500 cubic yards of common excavation and
25,000 cubic yards of rock excavation were removed from the site of
the lock. The pouring of concrete for the lock walls and sills was
completed except for the final pour on the upper guard and miter
sills. The installation of lock-wall piping, lock valves, and lock-
operating: machinery was completed. Lock gates were completely
           RIVERS AND IIARBORS-PITTSBURGH,                PA.,   DISTRICT        945
installed. The pouring of concrete for the power house was com-
pleted and power-plant equipment was 95 percent installed. Con-
tract work is 99 percent complete.
    At Lock No. 4 the construction of an extension to the upper guide
wall by contract was completed. The total cost, all for new work,
was $1,397,786.95. The total expenditures during the fiscal year
were $1,400,808.10, all from regular funds.
    Operations conducted with funds allotted by Federal Emergency
Administration of Public Worlks.-At new Dam No. 3 the first sec-
tion of cofferdam was completed and 115,200 cubic yards of common
excavation were removed from the dam site. Two thousand four
hundred and sixty cubic yards of concrete were placed for the abut-
ment and 1,260 yards of derrick stone were placed for bank pro-
tection below the abutment. The total cost, all for new work, was
$167,882.32 and the total expenditures were $149,259.19.
    Condition at end of fiscal year.-The project is about 87 percent
complete. Locks and Dams Nos. 1 to 8, inclusive, are in operation,
giving slack-water navigation from the mouth to Rimerton, Pa., a
distance of 61 miles, with a controlling depth of 7 feet on the upper
:sill of Lock No. 3.
    The work remaining to be done to complete the project is the
-extension to guide wall at Lock No. 5, additional bank protection
and the erection of two lockkeepers' houses at Lock No. 7, the com-
pletion of a dredged 9-foot channel from Lock No. 1 to Lock No.
2, the elimination of Locks and Dams Nos. 1, 2, and 3, and the
,completion of new Locks and Dams Nos. 2 and 3.
    For condition of locks and dams see table under Existing project.
Available minimum drafts vary from 7 to 8 feet from March to
November.
    Under allotment from the Public Works Administration, the first
section of cofferdam for new Dam No. 3 was completed and concrete
for the dam and abutment is being placed.
   The total costs have been as follows:
Regular funds:
   New work        -------------------------------------- $12, 970, 215. 80
    Maintenance --- : _        ________________
                             -___-__ --              ___ _     238, 815. 07

                                                                      13, 209, 030. 87
:Public works funds, new work__-----------------------------              167,882. 32

       Total cost, all funds_----------------------------             13, 376, 913. 19
   The total expenditures were $13,295,272.98, including $149,259.19
from Public Works funds.
   Proposed operations, regular funds.-The balance unexpended, in-
cluding accounts receivable at the end of the year, will be applied as
follows:
Accounts payable June 30, 1934_-___------------------                    $66, 817. 24
:New work:
    Completing construction of new Lock and Dam No. 2 by con-
      tract (July 1 to Sept. 30, 1934)        --------------------------  37, 880. 00
    Completing construction of new Lock No. 3 by contract (July 1-
      31 1934.)_     ---------    ------------------------------- 19, 000. 00
   -Balance remaining -----------------------                              4, 006. 92

       Total (including accounts payable) ---------------------          127, 704. 16
946          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

   The balance unexpended of funds allotted by the Public Works
Administration, including the sum of $240,000 allotted after June 30,
1934, will be applied as follows:
Accounts payable June 30, 1934_________
                                    ------               ---------                                           $20, 746. 32
Completing construction of new Dam No. 3 by contract (July 1,
  1934, to May 1, 1935) __--------_---------------------------                                               862, 900. 00
Removal of old Locks and Dams Nos. 2 and 3 under contract
  Sept. 1, 1934, to Sept. 15, 1935) -----------------------------                                             85, 000. 00
Dredging at Mosgrove, Pa., and at Cowanshannock Creek near
  Mosgrove, under contract (Sept. 1, 1934, to Mar. 31, 1935) ..--                                             65, 000. 00
Dredging at Cogley Island, near Ford City, Pa., under contract
  (Sept. 1, 1934, to Apr. 30, 1935) ------------------------------                                            90, 000. 00
Balance remaining__        ___     -------------------                                                         2, 217. 68

         Total (including accounts payable) --------------------                                        1, 125, 864. 00
  No additional funds can be profitably expended during the fiscal
year 1936.
                                       Cost and fiancial summary
                              MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934_______________________                                              $12, 970, 215. 80
Cost of maintenance to. June 30, 1934 ___- _____----------238,                                                  815. 07

      Total cost of permanent work to June 30, 1934__________                                          13, 209, 030. 87
Plus accounts receivable June 30, 1934____--__--- ---------                                                  3, 800. 16

      Gross total cost to June 30, 1934__________________                                        _     13, 212, 831.03
Minus accounts payable June 30, 1934     ___-_________---_                                                  66, 817. 24

                                 __---------
      Net total expenditures ------                       --------                                     13, 146, 013. 79
Unexpended balance June 30, 1934_______________------------                                                123, 904.00

         Total amount appropriated to June 30, 1934________                                            13, 269, 917. 79

    Fiscal year ending June 30              1930              1931             1932             1933             1934


Cost of new work ...---------------   $1, 877, 197. 12 $1, 231, 533. 96 $846, 973. 64       $952, 214. 75 $1, 397, 786. 95
Cost of maintenance---------          ---------------------------- --------------          -----------------------

Total expended.-----------------       1, 765, 627. 85   1, 441, 449. 14    863, 665. 25     887, 189. 14     1, 400, 808.10

Allotted -------------------------       800, 000. 00      154, 000. 00    -228, 000. 00   2, 845, 083. 69      144, 799. 40


Balance unexpended July 1, 1933--__---_------------------   $1,379,912. 70
Amount allotted from Emergency Relief and Construction Act
  approved July 21, 1932_-__ _____                    -150,
                                      ___-____--_______             000. 00

     Amount to be accounted for_____________________                                              _     1, 529, 912. 70
Deductions on account of impounded funds revoked--------                                                     5, 200. 60

      Net amount to be accounted for____-____-____- ___ _                                               1, 524, 712.10
Gross amount expended_______         __________     $1, 408, 659. 55
Less-
    Reimbursements collected--------$7, 150. 77
    Receipts from sales ------------        700. 68
                                                          7, 851. 45
                                                                                                        1, 400, 808. 10
         Balance unexpended June 30, 1934 .........                                              __          123, 904.00
                    RIVERS AND HARBORS-PITTSBURGH,                                             PA., DISTRICT                          947
Outstanding liabilities June 30, 1934___ ______----$581.           08
Amount covered by uncompleted contracts                  155, 822. 08           -----                                    $156, 403. 76

     Balance available June 30, 1934__ __-______-----------32,                                                                 499. 76
Accounts receivable June 30, 1934__----------------------------                                                             3, 800.16

            Unobligated balance available June 30, 1934_____________                                                     -28,      699. 60

                                                       PUBLIC WORKS FUNDS

Cost of new work to June 30, 1934________-_____-----------             167, 882. 32
Cost of maintenance to June 30, 1934___ -       -       -__________--------------
      Total cost of permanent work to June 30, 1934----------                                                             167, 882. 32
Plus accounts receivable June 30, 1934____________________                                                                  2, 123. 19

      Gross total costs to June 30, 1934________________ _____                                                            170, 005. 51
Minus accounts payable June 30, 1934_______________111                                                                     20, 746.32

     Net total expenditures -__   ___- ___-____-___--                                                __-__--              149, 259. 19
Unexpended balance June 30, 1934_         ______883,                                                                           740. 81
            Total amount appropriated to June 30, 1934_____________                                                     1, 033, 000. 00

     Fiscal year ending June 30                        1930                 1931        1932               1933                   1934


Cost of new work..--------                     .....             ----------------...                              ---           $167, 882. 32
Cost of maintenance----------------------

Total expended.--------------- --                 ----------                                              --- ----
                                                                                                     ---------                   149, 259. 19
Allotted-.-             ,
                        ---------... ----....--------------...                                                              1,033, 000. 00


Amount allotted from National Industrial Recovery Act approved
  June 16, 1933-----------           ------------------------- $1,033,000.00
Gross amount expended___________________________ $164, 775. 07
Less reimbursements collected                    ___---------------------
                                                           15, 515. 88
                                                                          149, 259. 19
      Balance unexpended June 30, 1934______________________----          883, 740. 81
Outstanding liabilities June 30, 1934________________ $70, 657. 68
Amount covered by uncompleted contracts----------- 758, 228. 86
                                                                          828, 886. 54
      Balance available June 30, 1934              ___________          _  54, 854. 27
Accounts receivable June 30, 1934____________________________               2, 123. 19
      Unobligated balance available June 30, 1934_____________             56, 977. 46
Amount allotted by Public Works Administration Emergency Ap-
  propriation Act fiscal year 1935_______________________________         240, 000. 00
      Balance available for fiscal year 1935___________________--         296, 977. 46
CONSOLIDATED               COST AND FINANCIAL SUMMARY FOR LOCK AND DAM                                             CONSTRUCTION,
                                        ALLEIGHENY RIVER, PA.

Cost of new work to June 30, 1934 _________________________ $13, 138, 098. 12
Cost of maintenance to June 30, 1934 ____-----_------- --        238, 815. 07
      Total cost of permanent work to June 30, 1934---------                                                       13, 376, 913. 19
Plus accounts receivable June 30, 1934                                                                                      923.35
                                                                                                                         5_______________----,
      Gross total costs to June 30, 1934_--  _____________-_                                                       13, 382, 836. 54
Minus accounts payable June 30, 1934____________-      --
                                                    - _______                                                           87, 563. 56
     Net total expenditures-   -       -      -      -__                                        --                   13, 295, 272. 98
                                                   _
Unexpended balance June 30, 1934----------------------                                                                1, 007, 644. 81
           Total amount appropriated to June 30, 1934----------                                                    14, 302, 917. 79
948           REPORT OF CHIEF OF ENGINEERS,                                       U. S.            ARMY,                 1934


    Fiscal year ending June 30                 1930             1931                1932                       1933              1934


Cost of new work .------------.          $1, 877, 197. 12 $1, 231, 533. 96     $846, 973. 64             $952, 214. 75      $1, 565, 669. 27
Cost of maintenance.----- ------------------            --------    -        -----------------------------------------

Total expended------------------         1, 765, 627. 85   1,441, 449. 14        863, 665. 25              887, 189. 14      1, 550, 067. 29
Allotted------------------------            800, 000. 00      154, 000. 00   -228, 000. 00             2,845,083.69          1, 177, 799. 401


Balance unexpended July 1, 1933_------------------                 $1, 379, 912. 70
Amount allotted from Emergency Relief and Con-
  struction Act approved July 21, 1932                      ------------
                                                    $150, 000. 00
Amount allotted from National Industrial Recovery
Act approved June 16, 1933________________----    1, 033, 000. 00
                                                                    1, 183, 000. 00

     Amount to be accounted for_____________________________                                                             2, 562, 912. 70
Deductions on account of impounded funds revoked------------                                                                  5, 200. 60

       Net amount to be accounted for________________________                                                            2, 557, 712. 10
Gross amount expended_______________________       $1, 573, 434. 62
Less :
    Reimbursements collected--------- $22, 666. 65
    Receipts from sales --------------     700. 68
                                                        23, 367. 33
                                                                                                                         1, 550, 067. 29
      Balance unexpended June 30, 1934_______________________                                                            1, 007, 644. 81
Outstanding liabilities June 30, 1934______________ $71, 239. 36
Amount covered by uncompleted contracts --------     14, 050. 94
                                                                                                                           985, 290. 30
     Balance available June 30, 1934_________________________                                                               22, 354. 51
Accounts receivable June 30, 1934_____________________________                                                               5, 923. 35
     Unobligated balance available June 30, 1934                                                                            28, 277. 86
Amount allotted by Public Works Administration Emergency Ap-
propriation Act, fiscal year 1935__                                                                                       240, 000. 00
          Balance available for fiscal year 1935-____-_                                                                    268, 277. 868

   5. OPERATING AND CARE OF LOCKS AND DAMS, ALLEGHENY
                        RIVER, PA.

   The improvement forms part of the project for Allegheny River,
Pa., Construction of Locks and Dams, see pages 942 to 948, where
general information regarding the improvement can be found. The
completed locks and dams have been operated and maintained under
the permanent indefinite appropriation, as follows: No. 1 since Jan-
uary 1, 1903; no. 2, since November 10, 1906; no. 3, since November
29, 1904; no. 4, since September 6, 1927; no. 5, since October 20,
1927; no. 6, since October 10, 1928; no. 7, since November 11, 1930;
and no. 8, since May 21, 1931.
   Operations and results during fiscal year.-The operation and
'maintenance in serviceable condition of Locks Nos. 1 to 8, inclusive,
and channel dredging constitute the principal activities. The total
cost of operation and maintenance during the year was $173,488.75.
The total expenditures from the permanent indefinite appropriation
during the fiscal year were $164,433.39.
              RIVERS AND HARBORS-PITTSBURGH,                                   PA., DISTRICT                     949
  Condition at end of fiscal year. Eight locks and dams are in
satisfactory operating condition, maintaining their pools, with head
of slack-water navigation at Rimerton, Pa., 61 miles above the mouth.
For controlling depths and condition of locks and dams see report
on Allegheny River, Pa., Construction of Locks and Dams, pages
942 to 948 of this report. The total cost of operation and mainte-
nance to the end of the fiscal year was $3,259,331.51. The net total
amount expended from the permanent indefinite appropriation to the
end of the fiscal year was $3,249,464.43.
  Proposed operations.-The locks and dams will be operated and
maintained under allotments from appropriations made available for
such purposes.
                                       Cost and financial summary
Cost of maintenance to June 30, 1934________________________ $3, 259, 331. 51
Value of plant, materials, etc., on hand June 30, 1934-_______   -6, 789. 39
      Net total cost to June 30, 1934 ____.  _________   ____                                       3, 252, 542. 12
Plus accounts receivable June 30, 1934 ___._____________   .__                                               75. 00
     Gross total costs to June 30, 1934__________________.                                          3, 252, 617. 12
Minus accounts payable June 30, 1934_______________________                                              3, 152. 69
      Net total expenditures--___- -------     __                                 -      -__ _- 3, 249, 464.43
Unexpended balance June 30, 19,34 _..__.____-__-                                        ______
                                                                                           --       23, 095. 19
         Total amount appropriated to June 30, 1934_-                    -------------              3, 272, 559. 62

    Fiscal year ending June 30             1930            1931            1932              1933             1934

Cost of new work---....--------------------
Cost of maintenance--------------       $213, 083. 22   $202, 112. 03   $219, 138. 77     $184, 661.66     $173, 488. 75

Total expended.    ----------------      216, 367. 11    195, 663. 53    239, 827. 95      189, 517. 03     164, 433. 39

Allotted------_--------   ----------     235, 000. 00    200, 000. 00    239, 000. 00      150, 410. 97     181, 372. 47



Balance unexpended July 1, 1933_                                  $6, 156. 11
Amount allotted from permanent indefinite appropriation, sec. 6,
  River and Harbor Act, Mar. 3, 1909--------------               192, 200. 00

     Amount to be accounted for___ __________--     _______ 198, 356. 11
Deductions on account of impounded funds revoked ___--____- -10, 827. 53

      Net amount to be accounted for_______--       ___----------      187, 528. 58
Gross amount expended__________ _______----__-          $168, 885. 11
Less:
    Reimbursements collected-    -_______-- $4, 141. 72
                       -------
    Receipts from sales____________             310. 00
                                                             4, 451.72
                                                                       164, 483. 39

      Balance unexpended June 30, 1934_________-- ---    ___                                         - 23, 095. 19
Outstanding liabilities June 30, 1934 _________-______--___                                             3, 152. 69

     Balance available June 30, 1934_______________________                                               19, 942. 50
Accounts receivable June 30, 1934---     _______----------75.                                                      00

                                                -----------
    Unobligated balance available June 30, 1934__                                                    - 20, 017. 50
Amount allotted for fiscal year 1935-------------------------                                         190, 000. 00

         Balance available for fiscal year 1935 ------------------- 210, 017.50
950    REPORT   OF CHIEF OF ENGINEERS,     U. S.   ARMY,   1934

6. OHIO RIVER ABOVE MILE 109, BETWEEN CAPTINA ISLAND AND
                     POWHATAN POINT

7. OPERATING AND CARE OF LOCKS AND DAMS AT EMSWORTH AND
   DASHIELDS, PA., AND NOS. 4 TO 13, INCLUSIVE, OHIO RIVER

              8. OHIO RIVER, OPEN-CHANNEL WORK

  6-8: For reports on these improvements see page 915.
                   91. YOUGHIOGHENY RIVER, PA.

   Location.-This river, the principal tributary of the Monongahela,
rises in Preston County, W. Va., near the western boundary of Mary-
land and flows northwestward 123 miles to McKeesport, Pa., where it
empties into the Monongahela River, 15.5 miles above its mouth. See
United States Geological Survey charts for Pennsylvania, Maryland,
and West Virginia.
   Previous projects.-Adopted by acts approved June 25, 1910, and
January 21, 1927. The total costs and expenditures on previous
projects, prior to the adoption of the existing project in 1930, were
$48,894.75, of which $47,194.75 was for new work and $1,700 for
maintenance.
   Existing project.-This provides for the canalization of the river
from the mouth to West Newton, Pa., 18 miles, by the construction
of three locks and dams.
   The estimated cost of new work, revised in 1928, is $3,670,400.
There is no estimate for annual maintenance.
   The existing project was authorized by the River and Harbor Act
approved July 3, 1930 (Rivers and Harbors Committee Document
No. 9, 61st Cong., 2d sess.). A map of the river is printed in House
Document No. 82, Fifty-sixth Congress, first session. The Chief of
Engineers is authorized to revise the plans and estimates to meet any
changes in conditions.
   Terminal facilities.-Privatelymaintained terminals for. unloading
coal, sand, gravel, manufactured products, etc., ample for present
requirements, exist at McKeesport, Pa.
   Operations and results during fiscal year.-U. S. derrick boat
Monallo completed redredging the channel at Fifteenth Street, Mc-
Keesport, Pa., removing 23,700 cubic yards of material. The total
costs, all for maintenance, were $2,806.49. The total expenditures
during the fiscal year were $2,806.49.
   Condition at end of fiscal year.-The effect of Pool No. 2, Monon-
gahela River, upon the dredged channel in the lower portion of the
Youghiogheny River, permits of commercial movements at the low-
water stage from the mouth to Fifteenth Street, McKeesport, Pa.,
by vessels of approximately 9-foot draft. No construction work
has yet been done on the canalization project adopted by the 1930
River and Harbor Act. The total cost of the existing project to the
end of the fiscal year was $15,998.80, all for maintenance. The total
expenditures under the existing project to the end of the fiscal year
were $15,998.80.
   Proposed operations-Regular funds.-The balance unexpended
will be applied to maintenance dredging by hired labor between the
mouth and McKeesport.
            RIVERS AND IHARBORS-PITTSBURGH,                                           PA., DISTRICT                 951
   The additiohal sum of $4,000 can be profitably expended during
the fiscal year 1936, to be applied to maintenance dredging of the
9-foot channel, mouth to Fifteenth Street, McKeesport, Pa. (July
1935 to October 1936).
   The relative desirability of the improvement in the interests of
commerce and navigation entails the postponement of new work on
the canalization project adopted by the River and Harbor Act of
July 3, 1930.
                                             Cost and financial summary
Cost of new work to June 30, 1934--------------------------                                              $47, 194. 75
Cost of maintenance to June 30, 1934- ------------ ___ __---                                              17, 698. 80

        Total cost of permanent work to June 30., 1934______________                                          64, 893. 55

Net total expenditures _____-----------------------                                                           64, 893. 55
Unexpended balance June 30, 1934__                                                                             3, 725. 69
        Total amount appropriated to June 30, 1934________________                                            68, 619. 24

        Fiscal year ending June 30                      1930              1931        1932        1933            1934

               ......
Cost of new work----                -----          - $4, 211. 32       .........
Cost of maintenance                                       700. 00
                                                       1-------------------,
                                                                           $10, 500    $1, 800    $892. 31       $2, 806. 49
     Total cost_-----------------------                5, 911. 32          10, 500      1, 800     892. 31
Total expended     -----------------------             5, 911. 32          10, 500      1, 800     892. 31        2, 806. 49
Allotted-------------------------------                2, 000. 00           8, 500      1, 800   4, 455. 66       2, 968. 83



Balance unexpended July 1, 1933----------------------------                                                   $3, 563. 35
Amount allotted from War Department Appropriation Act ap-
  proved Mar. 4, 1933_-            --                                                                          3, 000. 00
      Amount to be accounted for                                                                                , 563. 35
                                                                                                               6__________________
Deductions on account of impounded funds revoked-------------                                                      31. 17
      Net amount to be accounted for-......                                                                    6, 532. 18
Gross amount expended_____________-                                                    $5,203.54
Less reimbursements collected------------------                                         2, 397. 05
                                                                                                               2, 806. 49

        Balance unexpended June 30, 1934______________________                                                 3. 725. 69

Amount (estimated) required to be appropriated for completion
of existing project 1_____________________________________   3, 670, 400. 00

Amount that can be profitably expended in fiscal year ending
                              1 -_ - - - - - - - --- -- --- -- --
June 30, 1936 for maintenance ___ ____                                                                        4, 000. 00

                                 10. TYGART RIVER DAM, W. VA.

  Location.-The Tygart River has its source in Pocahontas County,
W. Va., and flows northerly for a distance of about 131 miles to its
junction with the West Fork at Fairmont, W. Va., where it forms the
head of the Monongahela River. The dam site for the Tygart River
Reservoir is located on the Tygart River in Taylor and Barbour
Counties, 2.25 miles above Grafton, W. Va.
  1Exclusive of available funds.
952     REPORT OF CHIEF        OF ENGINEERS, U.       S.   ARVIY,   1934

  Existing project.-No work has been authorized by Congress.
Under the National Industrial Recovery Act provision was made
for the construction of a concrete gravity type dam 1,850 feet in
length at the crest line, and rising 215 feet above the elevation of the
river bed. This dam will provide for the storage of 100,000 acre-
feet to make up the deficiency of water in the Monongahela River
during low rainfall periods and for the additional storage of 227,500
acre-feet for flood prevention in the Monongahela and Ohio Valleys.
   The estimated cost of new work is $12,000,000, with $45,000 for
annual maintenance and operation.
   Operations and results during fiscal year.-The drilling of test
holes at the dam site was completed. A 70-mile contour survey for
clearing control was completed and the clearing of the reservoir site
was commenced. The work of contouring the basin in 5-foot con-
tours was in progress. Property plans of the dam site were com-
pleted and preparation of property plans for the reservoir basin was
commenced. Preliminary work on plans and specifications for the
dam was in progress. The installation of a recording river-stage
gage was completed, as was a ditch for exposing the foundation of
the dam. The total costs, all for new work, were $106,835.79. The
total expenditures during the fiscal year from funds allotted by the
Public Works Administration were $89,758.24.
   Condition at end of fiscal year.-All preliminary work necessary
to actual construction of the dam is in progress. The total cost of
the existing project to the end of the fiscal year was $106,835.79, all
for new work. The total expenditures were $89,758.24.
  Proposed operations.-The balance unexpended of funds allotted
by the Public Works Administration, including the sum of $7,000,000
allotted after June 30, 1934, will be applied as follows:
Accounts payable ---------------------------------------       $21, 945. 92
New work:
   Part construction of reservoir dam by contract (July 1, 1934,
     to June 30, 1937) ---------------------------------         8, 878, 295.84
   Purchase of land and flowage easements (July 1, 1934, to
     June 30, 1937) ------------------------------------            350, 000.00
   Clearing of land (July 1, 1934, to Jan. 31, 1935)-                 0, 000. 00
                                                                     6-----------
   Relocation of State highways and railroads by contract (to
     anticipate completion of dam) (July 1, 1934, to June 30,
     1937) --------------------------------------------             600, 000. 00

        Total       ___-----------------------------------------     9, 910, 241.76
  The additional sum of $2,000,000 can profitably be expended
during the fiscal year 1936 to complete construction of reservoir dam
by contract (July 1, 1935, to June 30, 1937), $2,000,000; total for all
work, $2,000,000.
  It is estimated that the additional funds requested for the fiscal
year 1936 will complete the construction of the reservoir dam, allow-
ing for the relocation of all necessary State highways and railroads,
the purchase of land and flowage easements, and the clearing of all
growth from the reservoir site.
                  RIVERS AND HARBORS-PITTSBURGH,                                PA., DISTRICT                953
                                         Cost and fincacial        summary
Cost of new work to June 30, 1934_________-----
                                        ------       -      -                                      $106, 835. 79
Cost of maintenance to June 30, 1934__________________________

      Total cost of permanent work to June 30, 1934-----------                                      106, 835. 79
Value of plant, materials, etc., on hand June 30, 1934- - -                                           4, 868. 37

     Net total cost to June 30, 1934----------------------------                                    111, 704. 16
Minus accounts payable June 30, 1934____________________---_                                         21, 945. 92

     Net total expenditures__-_______                        _          -___________                  89, 758. 24
Unexpended balance June 30, 1934_                                 -----------                     2, 910, 241. 76

           Total amount appropriated to June 30, 1934_______________ 3, 000, 000. 00

    Fiscal year ending June 30                 1930        1931           1932         1933               1934


Cost of new work.--------------------------------------------------------                              $106, 835. 79
Cost of maintenance  . . . . . -.... . . . . . . . . . . . . . .                              .
Total expended-----                --------------------------------------------------------              89, 758. 24
Allotted ...........-..---   ...............    .--------------                    ------------       3, 000, 000. 00

Amount allotted from National Industrial Recovery Act ap-

,Gross
proved June 16, 1933___
     amount expended______________________________   __
                                                          $3, 000, 000. 00
                                                               89, 758. 24
      Balance unexpended June 30, 1934_________________---                                        2, 910, 241. 76
Outstanding liabilities June 30, 1934_______________ $19, 545. 92
Amount covered by uncompleted contracts ----------     2, 400. 00
                                                                                                     21, 945. 92
           Balance available June 30, 1934_________________________                               2, 883, 295. 84
Amount allotted by Public Works Administration                               Emergency
Appropriation Act, fiscal year 1935                                                              7, 000, 000. 00
           Balance available for fiscal year 1935____________                       ____          9, 888, 295. 84

Amount (estimated) required to be appropriated for completion
  of existing project 1_______________________________________                                    2, 000, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1936, for new worl----------------------                                                2, 000, 000. 00

   11. EXAMINATIONS,                      SURVEYS, AND CONTINGENCIES                       (GENERAL)

  The cost of work during the year amounted to $71,286.96; the ex-
penditures were $63,978.39. The balance unexpended June 30, 1934,
will be applied during the fiscal year 1935, to payment of expenses
incurred in connection with the above items. The additional sum of
$64,500 can be profitably expended during the fiscal year 1936.
                                          Cost and financial summary
Cost of maintenance to June 30, 1934__________________________ $361, 331. 68
Value of plant, materials, etc., on hand June 30, 1934------------- -2, 764. 52
     Net total cost to June 30, 1934____________________________                                    358, 567. 16
Minus accounts payable June 30, 1934___________________________                                       3, 114. 23
     Net total expenditures__________________________________                                       355, 452. 93
Unexpended balance June 30, 1934                           __                                         9, 715. 91

           Total amount appropriated to June 30, 1934------_                                        365, 168. 84
   1Exclusive        of available funds.
954            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                1934


            Fiscal year ending June 30                   1930           1931          1932           1933             1934

Cost of new work....---------
Cost of maintenance--- ---------------- $35, 586. 69                $65, 684. 61 $126, 579. 69    $61, 027. 08      $71, 286. 96
Total expended ._-----------                  ---     35, 068. 53    65, 410. 20   155, 823. 91    34, 005. 25       63, 978. 39
Allotted-     ----     --------       -----           40, 000. 00   106, 000. 00    96, 350. 00    57, 789. 64       38, 029. 20


Balance unexpended July 1, 1933----- ---------------------     $35, 665. 10
Amount allotted from War Department Appropriation Act approved
Mar. 4, 1933--------------------                               40, 000. 00

     Amount to be accounted for7-------------------------                                                        75, 665. 10
Deductions on account of impounded funds revoked---------------                                                   1, 970. 80

      Net amount to be accounted for                                                                             73, 694. 30
Gross amount expended-------------------------$66,                                              667. 14
Less reimbursements collected_ -----------------                                             2, 688. 75
                                                                                                                 63,978. 39
      Balance unexpended June 30, 1934-----------------------                                                     9, 715. 91
Outstanding liabilities June 30, 1934-------         $1, 814. 23
Amount covered by uncompleted contracts-------------  1, 300. 00
                                                                                                                  3, 114. 23

            Balance available June 30, 1934                                                                        , 601. 68
                                                                                                                  6------------------------

Amount that can be profitably expended in fiscal year ending June
                             - - - - - - - - - - -           - - -
30, 1936, for maintenance 1                                                                                     64, 500. 00

Status of reports called for by river and harbor acts and committee resolutions


        Locality                  Authorization act         Transmitted            Document No.             Recommenda-
                                                            to Congress                                         tion
                            I
Allegheny and Monon-            Flood Control       Act,
gahela Rivers (survey            May 31, 1924.
for flood control).
Allegheny River, Pa.            Rivers and Harbors          Jan. 24, 1934      Rivers and Harbors           Favorable.
and N. Y.                        Committee resolu-                              Committee, 27, 73d
                                  tion, Sept. 23, 1933.                          Cong., 2d sess.
Beaver River, Pa.,              River and Harbor            Mar.     3,1934    House, 277, 73d Cong.,              Do.
  Shenango River, Pa.,           Act, July 3, 1930.                             2d sess.
  and Mahoning River,
  Pa. and Ohio.
Erie Harbor, Pa., to            River and Harbor
  Ohio     River,   via           Act, Sept. 22, 1922.
  French Creek and
  Allegheny River.
Erie Lake to Ohio River,        River and Harbor
  canal, via the Miami            Act, Mar. 2, 1919.
  and Erie Canal, Ohio,
  or other routes.
Kiskiminitas and Cone-          River and Harbor
  maugh Rivers, Pa.
Monongahela R i v e r,
                                  Act, Jan. 21, 1927.
                                Rivers and Harbors         May
                                                           May      25, 1934
                                                                    25, 1934
                                                                               ~----------------------
                                                                                          Unfavorable-
  Pa. and W. Va.                  Committee resolu-
                                  tion, Jan. 20, 1931.
Youghiogheny    River,          River and Harbor
Pa., up to West New-             Act, July 3, 1930.
ton.

   1 Exclusive of available funds.
        RIVERS   AND HARBORS-ZANESVILLE,           OHIO,   DISTRICT       955

IMPROVEMENT OF RIVERS AND HARBORS AND CON-
  STRUCTION OF FLOOD-CONTROL AND WATER-CON-
  SERVATION RESERVOIRS IN THE ZANESVILLE, OHIO,
  DISTRICT

  This district was established pursuant to General Orders, No. 3,
War Department, Office of the Chief of Engineers, dated March 29,
1934.
  The district embraces all of the Muskingum River watershed, in-
cluding operation and care of the locks and dams on the Muskingum
River. The operation and care of the completed Muskingum River
project has been under the jurisdiction of the Huntington, W. Va.,
district to June 30, 1934.
  District engineer: Maj. J. D. Arthur, Jr., Corps of Engineers.
  Division engineer: Lt. Col. R. G. Powell, Corps of Engineers.
                                 IMPROVEMIENTS

                                  Page                                    Page
1. Operating and care of locks           2. Muskingum River Valley Res-
    and dams on the Muskin-                  ervoirs, Ohio__               958
    gum River, Ohio__________      955   3. Examinations, surveys, and
                                             contingencies (general)       961

1. OPERATING AND CARE OF LOCKS AND DAMS ON THE MUSKINGUM
                        RIVER, OHIO

   Location.The Muskingum River, 110 miles in length, and lying
entirely in the State of Ohio, is formed by the junction of the Wal-
honding and Tuscarawas Rivers at Coshocton, Ohio, flows in a south-
erly direction and empties into the Ohio River at Marietta, Ohio,
172.2 miles below Pittsburgh, Pa.
   Existing project.-This authorized the taking over, restoration,
maintenance, and operation of the State works and plant to provide
slack-water navigation between Lock No. 1, at Marietta, Ohio, and
Dresden, Ohio, a distance of 91 miles. Navigation is afforded by 11
locks and dams and 4 short lateral canals. The maximum depth
which it is now possible to maintain without extensive improvement
is 4.5 feet, although in certain portions 5.5 feet is available. Above
the site of the old Lock No. 11 the minimum depth actually main-
tained is 2 feet. The navigable depth between Lock No. 1 and the
mouth, a distance of 0.25 mile, is provided by Dam No. 18, Ohio
River, and by dredging.
   The original estimate of cost of restoring the dams taken over
from the State of Ohio was $200,000. To this was added later the
construction of a new Lock and Dam No. 11, at a cost of about
$143,000, the repair and extension of a levee at Dam No. 10, and some
minor work, the net total expended from specific appropriations
having been $301,722.53. The construction of a new Lock No. 1 was
done in connection with the construction of an ice harbor as part of
the Ohio River improvement and was not a part of this project.
The maintenance of these works is provided for by annual allot-
ments from the appropriation for operating and care of canals, etc.
   The existing project was authorized by the following river and
harbors acts: The act of August 5, 1886, provided for taking over
956          REPORT          OF   CHIEF OF ENGINEERS,                           U.     S.   ARMY,        1934


from the State of Ohio the locks and dams then in existence (nos.
1 to 10) and the restoration of these works by the United States
 (H. Doc. No. 48, 49th Cong., 1st sess.) ; the act of March 3, 1905,
provided for the construction of Lock and Dam No. 11 and the ex-
tension of the levee at Lock No. 10 and other new work of minor
importance (H. Doc. No. 241, 58th Cong., 2d sess.). No map of the
river has been published.
   The following table gives the characteristics of the locks and
dams:

                                                                              Lock


Lock                                         Dimensions
and       Location (nearest                                    Upper         Lower
Dam      town, all in Ohio)       Miles                          sill          sill
                                                     Great-
No.                               from                        below         below      Lift            Foundation
                                                        est
                                  mouth Width                  upper         lower
                                                      avail-
                                        (clear)                 pool          pool
                                                       able
                                                     length


                                                                Feet          Feet      Feet
    1   M arietta ...... .          0. 25    56      179         7.58         10. 84    1 4. 77   Piles in sand and gravel.
    2   Devols-                     5.75     36      1.60        6. 00         5.50     10. 47    Rock.
    3   Lowell 2-                  13. 87    36      160         7. 00         5.50     14. 48    Piles.
    4   Beverly 2.                 24. 71    36      160         6. 00         5.52      9. 42    Gravel.
    5   Luke Chute --     __.      32. 97    36      160         6. 00         5.50     10. 90    Rock.
    6   Stockport ..-- ___.        39. 11    36      160         6. 00         5. 50    12. 05        Do.
    7   McConnelsville 2..         48. 22    36      160         6. 00         5.50     10. 14        Do.
    8   Rokeby Lock .....          56. 00    36      160         8. 00         5. 50    10. 99    Piles and grillage.
    9   Philo --                   66.84     36      160         8. 00         5. 50    11.28     Rock.
   10   Zanesville 3 2.......      75. 82    35. 5 f156.5
                                                                 6.50        1 7.04 }15.72        Rock and gravel.
                                                     158.5                    12. 50
   11   Ellis_          -_         83. 92    36      160 j       9.00    }     7.12 (411. 38      Piles in sand and gravel.
                                                                 5.00


Lock                                                        Dam
and     Location (nearest                                                                              When       Total
Dam town, all in Ohio)                                                                                 Com        cost
                                                                                                                  cost
                                                                                                                       6
No.                                    Foundation              Type of construction (all              pleted
                                                                      fixed dams)


    1   Marietta---------- Sand and gravel ..........                Rock-filled timber crib--          1890 7 $327, 500.00
    2   Devols--                 Rock
                           --------             -                 _....-do                              1840     91, 000.00
    3   Lowell 2__ _                                                 ..  do-         -do                1840    160, 000. 00
    4   Beverly 2--------        Rock and gravel ................        do                             1840    122, 000. 00
    5   Luke Chute _ _         ----- do               -                  do_                            1840     91, 000. 00
    6   Stockport ----- ---      Rock -- ---------__-- -----...          do                             1840     88,000.00
    7   McConnelsville 2__ Rock and gravel -                             do_                            1840    127, 000. 00
    8   Rokeby Lock .---- Piles in sand and gravel-                  --  do___                          1840     90, 000. 00
    9   Philo ..--------         Rock .......-                           do --------------------        18918    86,000.00
   10   Zanesville 3 2-------    Soft rock-        _               ---- do_                             1840    127, 000. 00
   11   Ellis                    (9) _......._ -..   --- --
                                                     _------         Concrete_                          1910 10 143, 095. 66

  1 Normal lift above normal pool of Dam No. 18, Ohio River.          Lock No. 1 has intermediate gate, only
lower chamber usable.
  2 Lateral canal between dam and lock.
  3 Double lock, flight of 2 tandem.
  4 Movable top of 4 feet high of Boule gates.
  aCrest of fixed part.
  6 Cost to the United States, $301,722.53, exclusive of cost of Lock ana Dam No. 1, which was constructed.
under the Ohio River project.
  7 Replaced an older lock on opposite side of river.
    Replaced an older lock constructed in 1840 at lower end of lateral canal which was also abandoned.
  9 150 feet of dam adjacent to lock on piles in sand and gravel. Remainder of dam, including pier and abut-
ment, on rock.
  10 Replaced an older lock ana dam located 2.6 miles farther upstream.


   Local cooperation.-Fully complied with.
   Terminal facilities.-Terminal                               facilities consist of a privately
owned wharf boat at Marietta at a point on the Ohio River 600
feet above the mouth of the Muskingum River, various private and
public landings, generally unimproved, at points accessible to public-
         RIVERS AND     HARBORS-ZANESVILLE,          OHIO,   DISTRICT         957

roads, and 4 coal tipples, 1 a short distance above Lock No. 9, 2 at
61/2 and 7 miles above Lock No. 9, respectively, and 1 about 9 miles
above Zanesville. There are also 3 sand-and-gravel unloading tip-
ples, 2 in Marietta and 1 in Zanesville. In a number of instances the
municipalities own paved wharves on their river fronts which are
free to all. The facilities, while somewhat meager, are adequate for
existing commerce.
   Operations and results during fiscal year.-The locks and dams
were operated as required and the necessary repairs to maintain in
serviceable condition were made thereto and to the appurtenant
structures. Navigation was suspended 30 days on account of ice.
Navigation past Lock No. 5 was suspended from May 1, 1934, to
June 30, 1934, on account of repairs to the lock walls, which work
was not completed at the end of the fiscal year. Navigation past
Lock No. 10 also was suspended on account of repair work from
January 5 to February 10, 1934. The river wall at Lock No. 5 became
so unsafe on account of washing out of mortar and cracks and loss
of stones in the masonry wall that its reconstruction was necessary.
The total cost of maintenance, was $168,946.88. The expenditures
were $132,803.60.
   Condition at end of fiscal year.-The locks and dams as a whole
are in fair condition considering their age, nearly 100 years. The
available depth for navigation is 4.5 feet. Navigation past Lock
No. 5 was suspended at the end of the fiscal year, and it is expected
that navigation may be resumed past that point on July 31, 1934.
The total cost at the end of the fiscal year was as follows:
New work------------------------------------           --------- $301,722. 53
Maintenance (repairs to levee, Dam No. 10, Zanesville, Ohio, act
  of Mar. 3, 1925) -------------------------------------------       5, 462. 08
From permanent indefinite appropriation-----------------------3,   838, 490.20
      Total----------                                                4, 145, 674. 81
  The expenditures were $4,138,317.32.
  Proposed operations.-The locks and dams will be operated and
maintained under allotments from appropriations made available
for such purposes.
    Cost and financial summary for maintenance and improvement funds
Cost of new work to June 30, 1934--------------------------           $301, 722. 53
Cost of maintenance to June 30, 1934-------------------------            5, 462. 08

      Total cost of permanent work to June 30, 1934----------          307, 184. 61
Net total expenditures---    -    -     -_                             307, 184. 61
Total amount appropriated to June 30, 1934 ----------------            307, 184. 61
          Cost and financial summary for operating and care funds
Cost of maintenance to June 30, 1934------------------------        $3, 838, 490. 20
Value of Iplant, materials, etc., on hand June 30, 1934----------        20, 577. 74

      Net total cost to June 30, 1934------------------------3, 859, 067. 94
Plus accounts receivable June 30, 1934 --------------------            8. 16

     Gross total costs to June 30, 1934--------------------          3, 859, 076. 10
Minus accounts payable June 30, 1934------------------------             27, 943. 39

      Net total exI)eIditures___ ___                                 3, 831, 132. 71
Unexpended balance June 30, 1934_ __-----------                          93, 048. 11
      Total amount appropriated to June 30, 1934----_                3, 924, 180. 82
958         REPORT OF           CHIEF OF ENGINEERS,                      U.   S.    ARMY,        1934


         Fiscal year ending June 30                1930          1931           1932           1933            1934


Cost of new work--------                 -----------------------------------------------------
Cost of maintenance------------------.....     $76, 489. 00 $74, 260. 18 $80, 019. 42 $170, 299. 43 $168, 946. 88
Total expended....-----...----------------...    63, 783. 29   62, 400. 22    88, 701. 07   119,073. 06      132, 803. 60
Allotted-----------------------------            75, 000.00    70, 000.00     81, 500. 00   121, 745. 28     204,809.67


Balance unexpended July 1, 1933--     _______--------------- __ $21, 042. 04
Amount allotted from permanent indefinite appropriation, sec. 6,
  River and Harbor Act, Mar. 3, 1909 _____________----------229, 000. 00

     Amount to be accounted for __-_______      ____ _______ 250, 042. 04
Deductions on account of-
   Revocation of allotment __-.  ______--------     _ $19, 767. 76
   Revocation of impounded savings_----------           4, 422. 57
                                                                   24, 190. 33
      Net amount to be accounted for ____         _________------       225, 851. 71
Gross amount expended___________------------             $153, 936. 56
Less:
    Reimbursements collected                  1, 264. 70
                                             $_____________
    Receipts from sales--------------        19, 868. 26
                                                            21, 132. 96
                                                                        132, 803. 60

      Balance unexpended June 30, 1934_________________________                                            93, 048. 11
Outstanding liabilities June 30, 1934_________________________                                             31, 849. 20

     Balance available June 30, 1934--------------------                                                   61,198. 91
Accounts receivable June 30, 1934_____ _______    ___                                                           8. 16

     Unobligated balance available June 30, 1934________________                                           61, 207. 07
Amount allotted for fiscal year 1935__        _______________                                              71, 200. 00
          Balance available for fiscal year 1935                  -...                 -__.__..           132, 407. 07

               2. MUSKINGUM RIVER VALLEY RESERVOIRS, OHIO

   Location.-The Muskingum River Valley lies in southeastern Ohio,
and the river, with its tributaries, drains approximately 8,000 square
miles. Its headwaters rise about 25 miles south of Lake Erie and it
flows into the Ohio River at Marietta, Ohio, 172 miles below
Pittsburgh, Pa.
   Existing p'roject.-Under the provisions of the National Industrial
Recovery Act the Federal Emergency Administration of Public
Works has made an allotment of $22,090,000 to aid in financing the
construction of 14 reservoirs in the Muskingum Valley of east cen-
tral Ohio. The allotment was made on the application of the
Muskingum Watershed Conservancy District, which has agreed to
furnish additional funds to be used in the purchase of rights-of-
way, flowage rights, and other expenses not directly involved in the
actual construction of the reservoirs.
   The project includes the construction of 14 reservoirs tentatively
located and numbered as follows:
              RIVERS AND HARBORS-ZANESVILLE,                                                      OHIO2 DISTRICT                          959


                                                                                                  Capacity Capacity  Total
No                                     Location                                          Drainage forood for water
                                                                                           area    control
                                                                                                   control  conser- capacity
                                                                                                            vation
                                                                                                            vation

                                                                                           Square
                                                                                               miles     Acre-feet    Acre-feet        Acre-feet
1   W ills Creek.._                     ..- ..---
                           .______--_---.-                  .....       -.....                   1 734    320, 000    _......            320, 000
2   Walhonding at Mohawk-__-________--------                                                    2 812    293, 000     ........          293, 000
3                        ...... --. --
     Killbuck Creek__.--------                    __-------                                        346     73, 000     .........          73, 000
4                             ...
     Sandy Creek .. __-_-_..-.----485                                                                     190, 000-       ....           190, 000
5   W akatom ika Creek-____-
                           .... . __-. .....             . ....-.---.                 .           145      69, 000          93, 000      162, 000
6   Seneca Fork at Wills Creek_----------------------__                                          122      58, 000          78, 000      136, 000
7   Clear Fork of M ohican River_ .........                 -___.---- .              -__         206      98, 000            4, 000     102, 000
8   Black Fork of Mohican R iver_ .... __..__.                          .220--...
                                                                       ___                                104, 000          12, 000      116, 000
9   Stillwater Creek- -----      _-----------..-                                 -.....-.--
                                                                                   .               83      39, 000          53, 000       92, 000
10   Little Stillwater Creek---...._____-------------     .....                . -_                71      34, 000          46, 000       80, 000
11   Walnut Creek Fork of Sugarcreek---------------------__                                        49      23, 000          32, 000       55, 000
12   Indian Fork of Conotton Creek...-------------------------                                     73      35, 000          17, 000       52, 000
13   McGuire Creek Fork of Conotton Creek------------------                                        48      23, 000'         31, 000       54, 000
14   Lake Fork of Mohican River......--......              -----------                            252     127,000     .........          127, 000

I2Excluding
   Excluding drainage area above Seneca Fork Reservoir.
             drainage area above Clear Fork, Black Fork, and Lake Fork Reservoirs.

   Local cooperation.-Underan agreement entered into on March 29,
1934, between the Public Works Administration and the Muskingum
Water:hed Conservancy District, the district agrees to contribute to
the cost of the project by making available and expending the sum
of $12,000,000. This contribution shall include title in the district
to all necessary lands and easements, the cost of appraisals and other
administrative and legal expenses, and the expense (including con-
struction costs) of all necessary relocations and vacations of public
highways. The conservancy district further agrees to maintain, op-
erate, and protect the completed project, and that operation shall be
in such manner as in the judgment of the Chief of Engineers will
best serve the interests of navigation and flood control on the Musk-
ingum and Ohio Rivers. It also agrees to save the United States
harmless from all claims for damages arising from the construction,
maintenance, and operation of the project.
   Operations and results during fiscal year.-The district engineer
is charged with the duty of preparing the official plan of the Mus-
kingum Watershed Conservancy District in cooperation with the en-
gineers of the conservancy district, and after approval of the plan
by the Chief of Engineers and the Conservancy Court of Ohio, with
the duty of constructing the reservoirs comprised in the approved
plan which shall then constitute the project and official plan. In
connection with the preparation of the official plan over 100 possible
reservoir sites were investigated in the basin. Detailed surveys,
foundation explorations, and aerial maps were made in connection
with 32 tentative reservoir sites. A laboratory for testing soils and
other materials was established. Hydrological and hydraulic studies
were made of the basin and its subareas for flood-control purposes to
aid in the development of the best reservoir plan possible with avail-
able funds. Preliminary design studies were made of the proposed
dams, outlet structures, spillways, and railroad and public-utility
relocations. Estimates of cost of individual reservoirs and for vari-
ous tentative reservoir systems were made. The total cost was
$150,603.42. Trhe expenditures were $107,643.96.
   Condition at end of fiscal yea.-The preparation of the official
plan was approximately 80 percent completed during the fiscal year.
          91536---ENG 1934-61
960        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

The total cost at the end of the fiscal year, all for new work, was
$150,603.42. The expenditures were $107,643.96.
   Proposed operations.-The unexpended balance on June 30, 1934,
remaining from the allotment of $22,090,000 from the National Indus-
trial Recovery Act will be applied as follows:
Accounts payable--- -------          -----------------------                   $130, 706. 58
New work:
    Preparation of the official plan (hired labor, July 1, 1934,
      to Apr. 1, 1935) :
        Engineering ---------------------------- $206, 986. 50
        Equipment-------------------------------             19, 300. 00
         Supplies --------------------------------            8, 590. 00
        Transportation---------------------------10, 900. 00
        Travel expense ---------------------------            4, 820. 00
        Consultation and legal advice___________-            16, 000. 00
        Map reproduction______---------                      16, 0,50. 00
        Drafting                                                 550. 00'
                                                             5--------------------------------,
         Surveys ---------------------------------           44, 877.55
        Foundation explorations ________---------131, 113. 41
        Test-pit studies --------------------------          34, 000. 00
         Hydraulic and soil laboratory studies-----          40, 500. 00
         Miscellaneous___   --------               -       - 11, 940,. 00
         Contingencies __-- ___-       _____-__-             52, 770. 00
                                                                                 649, 397. 46
    Construction under contract of reservoir dams, including
      construction costs of public-utility relocations------------21, 202, 252. 00
        Total----------------------------------------------                                                21, 982, 356. 04
   It is estimated that the funds will be expended at the average rate
of $400,000 per month during the fiscal year 1935, and that all work
will be completed within 3 years. The field investigations are not
sufficiently advanced to give definite order of priority of construc-
tion at sites. It is expected that construction of all dams, tenta-
tively fixed at 14 in number, will proceed simultaneously.
                                      Cost and financial summary

Cost of new work to June 30, 1934_ ___                        $150, 603. 42
Cost of maintenance to June 30, 1934_______ ________..___.__ _____        _---

     ..Total cost of permanent work to June 30, 1934                             -----------                  150, 603. 42
Value of plant, materials, etc., on hand June 30, 1934                           -----------                   87, 575. 27

      Net total cost to June 30, 1934 _____---- -___------ __-                                                238, 178. 69
Plus accounts receivable June 30, 1934_________.___.__________                                                     171. 85

     Gross' total costs to June 30, 1934-------------------__                                                 238, 350. 54
Minus accounts payable June 30, 1934_____-_______-_____                                                       130, 706. 58

     Net total expenditures__--- ------        _____-
                                                    -     -                                                    107, 643. 96
Unexpended balance June 30, 1934---------------------------                                                21, 982, 356. 04
         Total amount appropriated to June 30, 1934-                           ------------                22,090, 000. 00

   Fiscal year ending June 30              1930            1931               1932                  1933            1934


Cost of new work---_      ---------------------            _----      ---------------------------                 $150, 603. 42
Cost of maintenance ..------------                     _           .----
Total expended-----------------              ---------------                               -107,                        643. 96

Allotted--------------...            --------------------                                   __---               22, 090, 000. 00
             RIVERS AND HARBORS-ZANESVILLE,                             OHIO, DISTRICT                  961
Amount allotted from National Industrial Recovery Act ap-
  proved June 16, 1933_____________________     ___________    _ $22,. 000, 000. 00
Gross amount expended_    ______---__              $112, 517. 13
Less reimbursements collected __________------
                                            -4,          873. 17
                                                                       107, 643.96

      Balance unexpended June 30, 1934--____      ______-___-                               21, 982, 356.04
Outstanding liabilities June 30, 1934 _____..____ $148, 740. 72
Government cost on contracts_____----------          7, 000. 00
Amount covered by uncompleted contracts--------     54, 550. 68
                                                                                                 210, 291.40
     Balance available June 30, 1934____________________                                    21, 772, 064. 64
Accounts receivable June 30, 1934_ ___ ____  __----- -171.                                                85
         Unobligated balance available June 30r 1934 __________                             21, 772, 236. 49
    3. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                       (GENERAL)
  The cost of work during the year amounted to $6,812.17; the
expenditures were $6,402.70. The balance unexpended June 30,
1934, will be applied as needed during the fiscal year 1935 to pay-
ment of expenses incurred in connection with the above items. The
sum of $5,000 can be profitably expended during the fiscal year
ending June 30,1936.
                                        Cost and.financial summary
Cost of maintenance to June 30, 1934____-________--------- -      $6,812. 17
Value of plant, materials, etc., on hand June 30, 1934___________ -- 300. 14
      Net total cost to June 30, 1934_________ -_____-                               ______        6,512. 03
Plus accounts receivable June 30, 1934___---------------                               ____           16. 02
      Gross total costs to June 30, 1934----    -___- -  ___- - 6,528. 05
Minus accounts payable June 30, 1934 __-_---------------    -___  125.35
     Net total expenditures---   ----------------------------                                      6, 402. 70
Unexpended balance June 30, 1934__-__ -           ___------__--                  -    -       -    3,.515. 27
         Total amount appropriated to June 30, 1934__________                               __     9,917.97

   Fiscal year ending June 30             1930          1931          1932           1933            1934


Cost of new work-----------------                                                         -
Cost of maintenance.-----------------      -------    ------   -----------                _
                                                                             - --------------        $6, 812.17
Total expended..................         -----------------                                            6, 402. 70
                       ----------------------------------------.........---------------....
                                ..
Allotted.........................---------                                                               9, 97
                                                                                                        917.


Amount allotted from War Department Appropriation Act approved
  Mar. 4, 1933------------------------------------------$10,                                         000.00
Deductions on account of revocation of impounded funds----------_                                     82. 03
      Net amount to be accounted for-------------------------                                      9, 917. 97
Gross amount expended6-------------------------------------                                         , 402. 70
      Balance unexpended June 30, 1934____----                    ___________-                     3, 515. 27
Outstanding liabililties June 30, 1934__                                                           2, 348. 41
      Balance available June 30, 1934_________________________                                     1, 166.86
Accounts receivable June 30, 1934                            ---------                                 16.02
      Unobligated balance available June 30, 1934________________                                  1, 182. 88
Amount that can be profitably expended in fiscal year ending June
                                     - -   - -    -   - -   - -   -
                              -- -
30, 1936, for maintenance 1- ____                               _5, 000. 00
  'Exclusive of available funds.
962     REPORT   OF CHIEF OF ENGINEERS,        U.   S.   ARMY,   1934

  IMPROVEMENT OF RIVERS AND HARBORS IN THE
         HUNTINGTON, W. VA., DISTRICT
   This district embraces those portions of the States of Ohio, Ken-
tucky, West Virginia, Virginia, North Carolina, and Pennsylvania,
lying in the drainage basins of the Ohio River and tributaries from
about mile 109 between Captina Island and Powhatan Point, Ohio,
to about mile 317.5 just below the mouth of Big Sandy River, Ky.,
a distance of about 208.5 miles, including the following streams im-
proved for slack-water navigation: Ohio River, W. Va., with its
Locks and Dams Nos. 14 to 28, inclusive; Little Kanawha River,
W. Va.; Kanawha River, W. Va.; Big Sandy River, W. Va., and Ky.,
including Tug and Levisa Forks.
   The operating and care of the Muskingum River, Ohio, was under
the jurisdiction of this district to June 30, 1934, at which time this
river was transferred to the Zanesville, Ohio, district.
   District engineer: Maj. Fred W. Herman, Corps of Engineers.
   Division engineer: Lt. Col. R. C. Moore, Corps of Engineers, act-
ing division engineer to July 28, 1933; Col. George R. Spalding,
Corps of Engineers, to November 27, 1933; Lt. Col. Edmund L.
Daley, Corps of Engineers, to November 30, 1933; Lt. Col. R. G.
Powell, Corps of Engineers, since that date.
                               IMPROVEMENTS

                                 Page                                   Page
1. Construction of locks and            6. Operating and care of locks
     dams, Ohio River-     .------915        and dams on Kanawha
2. Operating and care of Locks              River, W. Va- -----------   972
     and Dams Nos.       14-28,         7. Operating and care of locks
     Ohio River ------------      925        and dams on Big Sandy
3. Ohio   River,  open-channel               River, W. Va. and Ky., in-
     work ------------------      927        eluding Levisa and Tug
4. Operating and care of locks               Forks-------------------973
     and dams on Little Kana-           8. Examinations, surveys, and
     wha River, W. Va------- 962            contingencies (general) _   976
5. Kanawha River, W. Va-----      965

  1-3. For reports on these improvements see page 915.
4. OPERATING AND CARE OF LOCKS AND DAMS ON LITTLE KANAWVHA
                       RIVER, W. VA.

   Location.-This river, 160 miles in length, rises on the western
slope of Laurel Hill, W. Va., flows in a general northwesterly direc-
tion, and empties into the Ohio River at Parkersburg, W. Va.
   Previous projects.-Adopted by the act approved August 14, 1876.
The amount expended on previous projects prior to commencement
of operations under the existing project was $214,418, of which $213,-
513.30 was for new work and $904.70 for maintenance. For further
details see page 1912 of Annual Report for 1915.
   Existing projeot.-This provides for 5 locks with fixed dams,
to give a navigable depth of 4 feet from the mouth of the river to
Creston, a distance of 48 miles. Under this project 1 lock and
dam (no. 5) was constructed, and 4 locks and dams (nos. 1 to 4)
were purchased from the Little Kanawha Navigation Co.
            RIVERS AND HARBORS--HUNTINGTON,                                                W. VA.,        DISTRICT                963
   The cost of purchase and repair of Locks and Dams Nos. 1 to 4
was $282,059.50, and the cost of constructing Lock and Dam No. 5
was $167,875.
  The existing project was authorized by the following river and
harbor acts: The act of June 14, 1880, provided for the construction
of a lock and dam (no. 5) 2 miles above Burning Springs (Annual
Report of 1875, pt. 1, p. 740); the act of March 3, 1905, provided
for the purchase and repair of Locks and Dams Nos. 1 to 4, in-
clusive (H. Doc. No. 309, 58th Cong., 2d sess., and Annual Report
for 1904, p. 2607). The latest published map is contained in House
Document No. 732, Seventy-first Congress third session. The fol-
lowing table gives the characteristics of the locks and dams:
                                                      Little Kanawha River


                           Location                             Lock dimen-                  Available
                                                                   sions                    depths over
                                                                                            miter sills at
                                                                                            normal pool
                                                               Great-          Lift at          levels                Year     Cost of
Lock                                                            est            normal
no.                                                    Dis-    avail-           poomal                               of com- lock and
             Nearest town (all in                     tance  able               levels                               pletion    dam
               West Virginia)                         above length Width
                                                      mouth    of                          Upper Lower
                                                            chainm-
                                                              ber

                                                      Miles     Feet    Feet     Feet       Feet     Feet
    1   Parkersburg ..........---------------           3. 5      125     23       6. 4      11. 1       10. 2        1874
    2   Slateo__-       -       ________-_             14. 5      125     23      11.3        9. 7        4. 4        1874     2$75,000
    3   Elizabeth_...........                   ...    25. 5      125     23      11. 0       9. 7        5. 0        1874
    4   Palestine ..............----------------       31.0       125     23      11.9        8. 5        4.1         1874
    5   Burning Springs-......---------.               40. 5      125     26      12. 4       7. 6        4. 0        1891      167, 875

   1Character of foundation, rock; kind of dam, fixed. Type of construction--lock, stone; dam, timber crib
filled with stone. Land wall of Lock No. 5 on piles in gravel.
   2 Purchase price.

   Terminal facilities.-Terminal facilities consist of privately owned
wharf boats, one at Parkersburg and one at Creston at the head of
slack water in Pool No. 5, and a gasoline- and oil-loading station and
a stiff-leg derrick located about 1/2 miles above the mouth of the
river. The terminal facilities are adequate for existing commerce.
   Operitions and results. during fiscal year.-The locks and dams
were operated as required and the necessary repairs made thereto
and to the appurtenant structures. Navigation was suspended 26
days on account of ice and high water. The total cost of mainte-
nance was $9,743.82 and the expenditures were $10,161.73.
   Condition at end of fiscal year.-The locks and dams are in fair
condition. The available depth for navigation is 4.0 feet. The total
cost under the existing project at the end of the fiscal year was as
follows :
New work             ------------------------                                                                          $257, 022. 72
Maintenance --------       -------------                                       ---------                         -       22, 977. 28
From     permanent               indefinite appropriations----------------------                                        607, 583. 00

        Total----------------------------------------------------                                                       887, 583.00
   The expenditures were $892,779.78.
964          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

   Proposed operations.-The locks and dams will be operated and
maintained under allotments from appropriations made available for
such purposes.
                                          Cost and financial summary

                                MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934------------------------------$470, 536. 02
Cost of maintenance to June 30, 1934----------------------------23, 881. 98
          Total cost of permanent work to June 30, 1934-------------                                   494, 418. 00

Net total expenditures----------------------------------------494, 418. 00
Total amount appropriated to June 30, 1934__                    494, 418. 00
                                          OPERATING AND CAIRE FUNDS


Cost of maintenance to June 30, 1934__----------------------                                           607, 583. 00
Value of plant, materials, etc., on hand June 30, 1934--------------                                     5, 060. 80
      Net total cost to June 30, 1934----------------      ---                                         612, 643. 80
Plus accounts receivable June 30, 1934---------------------------                                           360. 00

     Gross total costs to June 30, 1934-------------------------                                       613, 003. 80
Minus accounts payable June 30, 1934---------------------------                                             224.02

     Net total expenditures-----------------------------------                                         612, 779. 78
Unexpended balance June 30, 1934_
                                ---------------------------    -                                         4, 406. 31

          Total amount appropriated to June 30, 1934----------------                                    17, 186. 09


   Fiscal year ending June 30                1930           1931           1932           1933             1934


Cost of new work------------------
Cost of maintenance---------         --    $19, 866. 12   $83, 399. 25   $17, 365. 68   $13, 634. 96       $9, 743. 82
Total expended-----------------             16, 614. 26    83, 463. 55    12, 833. 44    13, 242. 47       10, 161. 73
Allotted ------------------------           50, 000. 00    48, 700. 00    11, 000. 00    11, 196. 37       12, 901. 79


Balance unexpended July 1, 1933--------------------------------  $1, 666. 25
Amount allotted from permanent indefinite appropriation, sec. 6,
River and Harbor Act, Mar. 3, 1909-------------------------     13, 400. 00

     Amount to be accounted for-------------------------------                                          15, 066. 25
Deductions on account of revocation of impounded funds------------                                          498. 21

      Net amount to be accounted for                                           04
                                                                     14, 5---------------------68
Gross amount expended------------------------------     $11, 016. 70
Less:
    Reimbursements collected ----------------- $850. 97
    Receipts from sales-----------------------    4. 00
                                                             854. 97
                                                                     10, 161. 73

      Balance unexpended June 30, 1934-----------------------                                            4, 406. 31
Outstanding liabilities June 30, 1934--------- ----------------------                                       786. 72
     Balance available June 30, 1934----------------------------   3, 619. 59
Accounts receivable June 30, 1934---------------------------------    360. 00
                                                 ..
     Unobligated balance available June 30, 1934---- .3,                                                    979. 59
Amount allotted for fiscal year 1935--  -------- ___                                                    12, 500. 00

          Balance available for fiscal year 1935-----------                                             16, 479. 59
       RIVERS AND HARBORS-HUNTINGTON,          W. VA., DISTRICT    965
                     5. KANAWHA RIVER, W. VA.

   Location.-This river, 97 miles in length, is formed by the junc-
tion of the New and Gauley Rivers, a short distance above Kanawha
Falls, W. Va., flows in a. general northwesterly direction, and empties
into the Ohio River at Point Pleasant, W. Va.
   Previous projects.-Adopted by act of March 3, 1873, and modi-
fied by the act of March 3, 1875. The amount expended was $50,000.
 (For further details see p. 1913 of Annual Report for 1915.)
   Existing projects.-The existing project provides for 8 locks with
movable dams and 2 locks with fixed dams to furnish a 6-foot nav-
igable depth from the mouth to a point 90.57 miles above. The
River and Harbor Act of July 3, 1930, provides for the replacements
of Locks and Dams Nos. 2, 3, 4, and 5, with two new locks and dams,
and provides further that any dredging in the section of river above
Charleston shall be prosecuted with a view to obtaining a depth of
9 feet and a width of 200 feet. The extreme fluctuations of the river
are due to floods and vary from 36.2 feet above low water at Kanawha
Falls, about 5 miles above the head of the slack-water improvement
and about 2 miles below where the Kanawha River is formed by
the junction of the New and Gauley Rivers, to 62.1 feet above low
water at the mouth at Point Pleasant, W. Va., where the maximum
stage is governed by the Ohio River.
   The estimate of cost for new work revised in 1933 is $10,899,000,
this amount being exclusive of amounts expended on previous
projects.
   The existing project was authorized by the River and Harbor Act
of March 3, 1875 (Annual Report for 1875, pt. 2, pp. 90 to 98), which
provides for the construction of 9 locks with movable dams and
3 locks with fixed dams. This project was modified by reducing
the number of movable dams to 8 (Annual Report for 1879, p.
550), and after 2 of the 3 fixed dams had been constructed the con-
struction of the third (no. 1) was postponed until its necessity should
become more apparent. The act of July 3, 1930, provided for the
replacement of Locks and Dams 2 to 5 and for dredging (H. Doc.
190, 70th Cong., 1st sess.). The latest published maps are contained
in House Document No. 31, Seventy-third Congress, first session.
   Supplementing the work authorized by Congress, the construction
of locks at the site of the dam on Kanawha River at Winfield, W. Va.,
and at Gallipolis, Ohio, on the Ohio River, as recommended by the
Chief of Engineers in House Document No. 31, Seventy-third Con-
gress, first session, has been included in the Public Works program
under the National Industrial Recovery Act.
   The following table shows the characteristics of the locks and dams
in both the original 6-foot navigation system and in the new 9-foot
system that is now under construction:
                                                                                                    Kanawha River

                            Location                       Lock dimensions       Available
                                             I         I
                                                                                depths over
                                                                                 IT   t

                                                                       Lift at miter sills at
                                                                                          L_1




                                                                                                                           Character                                                                              Year of     Cost of
Lock                                                                   normal normal pool                                  of founda-                 Kind of dam               Type of construction of dam        com-      lock and
No.                                               Dis- Greatest         pool      levels
              Nearest town (all in West          tance available Width levels                                                  tion                                                                               pletion      dam        o
                      Virginia)                  above length of
                                                 mouth chamber                 Upper Lower                I                                                                                                                               oH
        I                                        I     r              I------------r---------l            I            I                       I                            I                                 I             I----------
                                                 Miles       Feet    Feet           Feet         Feet         Feet
  12        Montgomery....        .---  __....... 84.84        271      50          10. 33        8.00         8. 67              Fixed..-------------Crib---------------------
                                                                                                                           Rock......                                                                              1887   2 $353, 608     00
  33        London....-------------------         82. 76       360      56          24. 00       18. 00       12. 00     _ do ------                         Concrete movable crest -..
                                                                                                                                     Roller gates--------..........                                                1934 4 3, 178, 700
  13        Riverside_______ . ..           __
                                            ..    79. 72       272      50          13. 67       10. 67        7.00      ._do----....Fixed- ------------     Crib_ _--------------------                           1882    4 490, 000
  14        Cabin Creek Jc_----------___          73.51        274      50           7. 25       14. 00        6. 75   ._do--..--    Movable chanoine - -    Wicket pass and weir .-----                           1880    4 275, 000
  32        Marmet (Belle).-__---....__           67.75        360      56         526.85        18.00        12.00      __do..--- Roller gates---------..   Concrete movable crest ---                            1934 2 3, 476, 000
  15        ...do---------------------            67. 56       274      50           7. 50       14. 00        6. 50     _do-- ...   Movable chanoine ..--   Wicket pass and weir ..----                           1880    4 275, 000     0
  66        South Charleston-...........          54. 28       313      55           8. 50       15. 25        6. 75   __do--- __    do--do----------------do                                                      1886    2 337, 625
  67        St. Albans___                         44. 20       313      55           8. 25       15. 00        6. 75   -_do..---     do-....
                                                                                                                                  ----         -..----
                                                                                                                                                    ... ....-.. do                 -.....                          1893    2 341, 136
  68        Plymouth---------------------         36. 22       313    ° 55           8. 00       16. 25        8.25    _do ..---.....do..--.--         -   -     ___
                                                                                                                                                                do-                                                1893    2 281, 975
 (7)        Winfield (Red House)                  31. 12       360      56          28. 00       18.00        12. 00   __-do .. _ Roller gates...---------   Concrete, movable crest ....                               4 5, 300, 000
  89        Buffalo---------------------...       25.50        313      55           6.25        13. 75        7.50         .-- do....---          Movable chanoine   -.-       Wicket pass and weir .----        1898     2 307, 120     t
8 10       Robertsburg---------------            19.20        313      55           7.00        14.00         7.00        -do----        --   ....--
                                                                                                                                                  do.....--                        do....... --.......            1898     2 282, 006      0H
8 11       Henderson------------------            1.81        313      55           5.65        17.00        11.35         Hardpan_. ---.. do..do..------------                  do- ...----       ---           1898
                                                                                                                                                                                                                  .1898    2 637, 803
 (9)        Gallipolis_    .----- ..........      (1o)         6006    110
                                                                                  } 26. 00       18.00        12. 00        Rock...... Roller gates....---------                Concrete movable crest.__               4 8, 215, 000
        I                                              I
                                                               360 I   110       I,
                                                                                                          i




   1 Replaced by Locks and Dams Nos. 3 and 2 (London and Marmet).
   2 Actual.
   3 Replaces former Locks and Dams Nos. 2 to 5, inclusive. Hydroelectric plants licensed by Federal Power Commission under construction at these sites.
   4 Estimated.
   5Head will be reduced to 24 feet upon completion of Winfield Lock and Dam.                                                                                                                                                             w

   6 Will be replaced by Winfield Locks and Dam (Public Works program).
   7 Will replace existing Locks and Dams Nos. 6 to 8, inclusive (locks under construction).
   8 Will be replaced by Gallipolis Locks and Dam on the Ohio River.
   9 Locks under construction. Locks and dam will replace Locks and Dams Nos. 9-11, inclusive, on the Kanawha River, and Nos. 24-26, inclusive, on the Ohio River.
   1014 miles below Point Pleasant on the Ohio River.
       RIVERS AND HARBORS-HUNTINGTON,          W.   VA.,   DISTRICT   967
    Recommended modifications of project.-Included in Public Works
program.
    Local cooperation.-The Federal Power Commission has granted a
license, no. 1175, to the Kanawha Valley Power Co. authorizing the
construction of a hydroelectric plant at each of the two dams con-
structed under the modified project. The license fee is fixed at
'$32,000 per annum for each site, and construction has been com-
menced.
    Terminal facilities.-The public terminal facilities consist of a
paved wharf and a wharf boat for handling packet shipments at
Charleston, W. Va. There are three gasoline and oil unloading sta-
tions at Charleston, Pratt, and Cabin Creek, but not available for
public use.
    Numerous coal tipples owned by private interests exist, available
for use only to the owners for loading into barges the coal mined by
them. There is also a freight terminal at Charleston where freight
may be transferred from barge to cars, or vice versa.
             OPERATIONS AND RESULTS DURING FISCAL YEAR

    Regular funds.-Contract for constructing the dam at Lock No.
2, Marmet, W. Va., was completed May 7, 1934. The total cost of
this work was $1,108,570.59. Contract for the landward lock, a
roller-gate dam, a power house on'the river wall of river lock, alter-
ing of the upper mitering gates of river lock, and furnishing and in-
stalling the power-house machinery and lock-illuminating system at
Lock No. 3, London, W. Va., was completed June 25, 1934. The total
cost of this work was $1,846,803.10. Land was purchased for the lock
site at Lock No. 3 for $11,500, and payment of $11,212 for flowage
easements in the pool of Lock No. 2 was made. The total cost of new
'work from regular funds during the year was $1,780,966.66. The
expenditures were $1,886,869.01.
    Public Works funds.-Land was purchased for the abutment of
Lock No. 3 (in part) for $3,000 and Lock No. 2 (in part) for $11,300.
Negotiations and condemnation proceedings for the purchase of
flowage easements in Pools 2 and 3 are under way. Old Locks Nos.
4 and 5 were removed; the removal of old Locks Nos. 3 and 2 is in
progress. Both banks above the completed locks and dams were
cleared of brush and trees below the new pool elevation. A lock-
master's dwelling was constructed by contract at Lock No. 3. The
total cost of this work was $8,282.08. Contract for the twin; locks
at Lock No. 1, Winfield, W. Va., was awarded October 9, 1933. The
work under this contract is approximately 41 percent complete.
Contract for the parallel Gallipolis Locks in the Ohio River 13.5
miles below the mouth of the Kanawha River was awarded October
23, 1933. The work under this contract is approximately 22 percent
complete. Dredging of lock approaches was completed, and a 9-foot
channel depth is now available from South Charleston to Longacre,
the farthest upstream terminal. The total cost of new work from
Public Works funds during the year was $1,882,464.47. The ex-
penditures were $1,743,021.02.
                  CONDITION AT END OF FISCAL YEAR

  Regular funds.--Old Locks Nos. 3, 4, and 5 have been abandoned,
having been replaced by recently completed Locks Nos. 2 and 3.
968        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                           1934

Old Lock No. 2 will be abandoned and removed during fiscal year
1935.     Old Locks Nos. 6 to 11, inclusive, are in fair condition and
with some repairs will fairly well meet the needs of navigation until
the new locks under construction                          are   completed.   The available
depth for navigation is 6 feet from the mouth to Lock No. 2, 9 feet
from Lock No. 2 to the head of the improvement. Above the im-
proved portion of the river the minimum depth in the open channel
is less than 1 foot. The total cost from regular funds under the ex-
isting project to the end of the year was $10,031,624.13, of which
$10,014,151.01 was for new work and $17,473.12 was for mainte-
nance.      The expenditures were $10,094,224.43.
  Public Works funds.-Contracts have been awarded and work is
in progress on all construction work authorized by the Public Works
Administration, which includes the locks at No. 1 (Winfield) and
at Gallipolis (Ohio River). The total cost of new work from Public
Works funds to the end of the year was $1,882,464.47. The expendi-
tures were $1,743,021.02.
                                       PROPOSED OPERATIONS

  Regular funds.-The balance unexpended and accounts receivable
at the end of the fiscal year will be applied as follows:
Accounts payable June 30, 1934---------                      -                    $30, 596. 03
New work (hired .labor and Government plant) :
    Oct. 1 to Nov. 30, 1934, esplanade and grounds:, Locks Nos. 2
      and 3 (Marmet and London) --------------------------                         40,000.00
    Nov. 1 to Dec. 31, 1934, installing permanent upper lock gates,
      Lock No. 3 (London)                       ---------------------------------  17, 000. 00
    Oct. 1-31, 1934, installing control valves on intermediate wall,
      Lock No. 2: (Marmet) --------------------------------                        26, 000.0 0
    Aug. 1-31, 1934, constructing emergency bulkhead unit, Lock
      No. 2 (Marmet) ---------------------------------                             12, 500. 00
    Ang. 1 to Sept. 30, 1934, improvements to existing structures,
      Locks Nos. 2 and 3      ---------------------------------- 52,026.01
    Contingencies       -----------------------------------------64, 600. 01
Maintenance (hired labor and Government plant) : Channel dredg-
ing-----------         --------------------------------------                      2,504. 13
        Total------------------------------------------                           245, 226. 17
  National IndustrialRecoveryAct funds.-The balance unexpended
and accounts receivable at the end of the fiscal year will be applied
as follows:
Accounts payable June 30, 1934_       ---                         $152, 275. 55
New work:
    Contracts:
        July 1, 1934, to Jan. 31, 1935, complete construction of
          twin locks, a central control station, and appurtenant
          works at the Winfield Lock and Dam -------------- 1, 312, 000. 00
        July 1, 1934, to Aug. 31, 1935, continue construction of
          parallel locks and appurtenant works at the Gallipolis
          Lock and Dam-----         -------------------------- 2, 504, 000.00
    Hired labor and Government plant:
        July 1 to Dec. 31, 1934, removal of Old Works Pools
           Nos. 2 and 3   ------------------------------------      76, 000.00
        Fiscal years 1935 and 1936, complete procurement of flow-
           age easements, Pools Nos. 2 and 3------------------     400, 237. 86
                 Total_ ____--------_-------------                              4, 444, 513. 41
       RIVERS AND HARBORS-HUNTINGTON,                              W. VA., DISTRICT         969
  The additional sum of $2,575,000 allotted during July 1934 will be
applied as follows:
New work (contract) :
   Oct. 1, 1934, to Mar. 31, 1937, construction of roller-gate dam
     at the Gallipolis Lock and Dam, consisting of the masonry
     for the sills, piers, and abutment; roller gates and gate-
     operating machinery, roller-gate-operating houses, service
     bridge, and electrical work --------------------------- __ $21,490, 000
   June 1, 1935, to Sept. 30', 1935, construction of power house and
     installation of lock-operating machinery, Gallipolis Lock and
     Dam -----------       -------------------------------------
                                  __                                 85, 000
        Total       -------------------------------------------                 ___   2, 575, 000
  The additional sum of $1,653,000 can be profitably expended dur-
ing the fiscal year ending June 30, 1936, to be applied as follows:
New work:
   Contract:
       July 1, 1935, to June 30, 1936, commence construction of a
          roller-gate dam at Lock and Dam No. 1 (Winfield)_ _ __- $1, 200, 000
       Sept. 1 to Nov. 20, 1935, complete construction of
          parallel locks and appurtenant works at the Gallipolis
          Lock and Dam------------------------------------_           323, 000
   Hired labor and Government plant:
       July 1, 1935, to June 30, 1936, surveys to determine flowage
          damage in the pools of Lock No. 1, and the Gallipolis
          Locks -------------------------------------------           130, 000
            Total                 ----------------------------------------            1, 653, 000
  The foregoing application of funds will complete the structures
of the Gallipolis Lock and Dam, complete the locks at Lock No. 1
 (Winfield) and about 50 percent of the dam. The remaining work
to be done to complete the project consists of completing the Win-
field Dam, and the following work at both sites: Grading and pav-
ing esplanades, procurement of flowage easements, clearing banks,
removal of old works, and dredging.
                               Cost ancd financial summary

                      (MAINTENANCE          AND IMPROVEMENT         FUNDS

Cost of new work to June 30, 1934_---__-------------------- $10, 064, 151. 01
Cost of maintenance to June 30, 1934_,-------------------------   17, 473. 12

      Total cost of permanent work to June 30, 1934---------- 10, 081, 624. 13
Value of plant, materials, etc., on hand June 30, 1934----------    5, 139. 62

      Net total cost to June 30, 1934-__ _1111---------        10, 086, 763. 75
Plus accounts receivable June 30, 1934 ------------------------     88, 056. 71

      Gross total costs to June 30, 1934__--------------    10, 174, 820. 46
Minus accounts payable June 30, 1934-----------------------      30, 596. 03

     Net total expenditures__----------------------------                       10,144, 224. 43
Unexpended balance June 30, 1934--------------------------                         157, 169. 46

      Total amount appropriated to June 30, 1934                  -----------   10, 301, 393. 89
 970            REPORT OF                  CHIEF OF ENGINEERS,                                   U.       S. ARMY,                  1934


     Fiscal year ending June 30                         1930                 1931                  1932                   1933                      1934


Cost of new work_ __....------------------      $374, 615. 73 $2, 003, 073. 82 $1, 610, 882. 55 $1, 780, 966. 66
Cost of maintenance__-----------        ------------               16,145. 79        1, 329. 71 ...........

        Total cost ....-----------......--------------                    374, 615. 73        2, 019, 219. 61        1, 612, 212. 26            1, 780, 966. 66
Total expended------ ------------------------                            336, 442. 88        1, 845, 421. 30        1, 780, 878. 99            1, 886, 869. 01

Allotted------.............-----       --------- -------              2, 050, 000. 00          397, 000. 00         2, 935, 004. 53              624, 777. 11



Balance unexpended July 1, 1933_ -------------------------  $1, 419, 261. 36
Amount allotted from War Department Appropriation Act ap-
  proved Mar. 4, 1933   ------------------------------------     632, 000. 00

      Amount to be accounted for____-- ------------------                                                                               2, 051, 261. 36
Deductions on account of revocation of impounded funds --------                                                                             7, 222. 89

       Net amount to be accounted for-_-------------------                                                                              2, 044, 038. 47
Gross amount expended ---------------------
                        __                              $1, 962, 191. 66
Less reimbursements collected ------------------            75, 322. 65
                                                                                                                                        1, 886, 869. 01

       Balance unexpended June 30, 1934-- ---       -_-----                                                                               157, 169. 46
Outstanding liabilities June 30, 1934___ ____-$10,            091. 06
Amount covered by uncompleted contracts----- --           64, 600.00
                                                                                                                                              74, 691. 06

      Balance available June 30, 1934----------                                                                 ------                        82, 478.40
Accounts receivable June 30, 1934--                                                                                                              056. 71
                                                                                                                                              8---------------------88,

            Unobligated balance available June 30, 1934 --------                                                                -         170, 535.11
                                                       PUBLIC WORKS FUNDS

Cost of new work to June 30, 1934 .............                                                                                    $1, 882, 464. 47
Cost of maintenance to June 30, 1934                                                                                               -------------
       Total cost of permanent work to June 30, 1934----------                                                                       1,   882, 464. 47
Value of plant, materials, etc., on hand June 30, 1934--------                                                                           -- 5, 502. 33

      Net total cost to June 30, 1934_--__------------__         ......                                                              1, 876, 962. 14
Plus accounts receivable June 30, 1934 __-             -__ ---------- _                                                                  18, 334. 43

     Gross total cost to June 30, 1934 _--------__----------- 1, 895, 296. 57
Minus accounts payable June 30, 1934_    -----------        --   152, 275. 55

     Net total expenditures-                                       ---------------------                              1, 743, 021. 02
Unexpended balance June 30, 1934 .                                                                                    4, 426, 178. 98
                                                                                                          .-------------------------
           Total amount appropriated to June 30, 1934_.---------                                                                        6, 169, 200. 00

    Fiscal year ending June 30                         1930                 1931                  1932                   1933                      1934


Cost of new work....------------------------------.......-------------                                               .......                  $1, 882, 464. 47
Cost of maintenance.....    . ..     . . . ..       . . . ...          .                              .    .    ..      . .         .     .
Total expended---.....              -------------------------------------------------------                                                    1, 743, 021. 02
Allotted -----------------------------------------------                                                                                       6, 169, 200. 00
                 RIVERS AND HARBORS-HUNTINGTON,                                           W. VA., DISTRICT                            71.
Amount allotted from National Industrial Recovery Act ap-
   proved June 16, 1933---------------------------------           $6, 16, 200. 00
Gross amount expended-                               4__02------------
                                                 $1, 743,027.32
Less reimbursements collected-----------------            6. 30
                                                                     1, 743, 021.02
       Balance unexpended June 30, 1934_.         ._._.______--                                                  4, 426, 178.98
Outstanding liabilities June 30, 1934_ __--__---     $21, 696. 55
Amount covered by uncompleted contracts------ 3, 710, 111. 41
                                                                                                                 3, 731, 807. 96
      Balance available June 30, 1934 ___ -- ________---694,                                                              371. 02
Accounts receivable June 30, 1934- -----.-----------------                                                           18, 334. 43

      Unobligated balance available June 30, 1934_-___-                                                              712, 705.45
Amount allotted by Public Works Administration Emergency
  Appropriation Act, fiscal year 1935 ----------------------                                                     2, 575, 000. 00

              Balance available for fiscal year 1935__------------                                               3, 287, 705. 45

Amount (estimated) required to -be      appropriated for completion
                                      - - - - - - - - - -    -
  of existing project 1- - - - - -- -                              _                                             5, 325, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1936, for new work 1_   -- __------ -   ___ -___                                                       1, 653, 000. 00
       CONSOLIDATED COST AND FINANCIAL SUMMARY FOR KANAWHA                                                 RIVER, W. VA.

Cost of new work to June 30, 1934-......--           ---------                                                $11, 946, 615.48
Cost of maintenance to June 30, 1934_ __.--.------------17,                                                             473. 12
      Total cost of permanent work to June 30, 1934________                                                    11,964, 088. 60
Value of plant, materials, etc., on hand June 30, 1934                                   ----------                 -- 362. 71
      Net total cost to June 30, 1934___-        -_______--_ 11, 963, 725. 89
Plus accounts receivable June 30, 1934_..... ___   ___-____-     106, 391. 14
      Gross total costs to June 30, 1934_......-----------.                                                    12, 070, 117. 03
Minus accounts payable June 30, 1934------------------------                                                       182, 871.58
     Net total expenditures- __.._______--__       __-                                                         11, 887, 245. 45
Unexpended balance June 30, 1934_------____-__--____,                                                           4, 583, 348. 44
             Total amount appropriated to June 30, 1934_-___                                        __-        16, 470, 593.89

     Fiscal year ending June 30                      1930          1931               1932              1933                   1934


Cost of new work................--------------                  $374, 615. 73 $2,003,073. 82 $1, 610, 882. 55        $3, 663, 431. 13
Cost of maintenance----------------...........-.                                  16, 145. 79      1, 329. 71         -.---.

         Total cost--.....                --...            _
                                              .-.............. 374, 615. 73      2, 019, 219. 61   1, 612, 212. 26    3, 663, 431. 13
Total expended-................. ............. 336, 442. 88                      1, 845, 421. 30   1, 780, 878. 99    3,629,890.03
Allotted..-.--------------.------------                        2, 050, 000. 00     397, 000. 00    2,935,004.53       6, 793, 977. 11


Balance unexpended July 1, 1933-------------------------          $1,419,261.36
Amount allotted from War Department Appropria-
  tion Act approved Mar. 4, 1933 --_________-$632, 000. 00
Amount allotted from National Industrial Recovery
  Act approved June 16, 1933 ______-       ___--- 6, 169, 200. 00
                                                                   6, 801, 200. 00
            Amount to be accounted for---                                                                 _- 8, 220, 461. 36
Deductions on account of revocation of impounded funds...                                                              7, 222. 89
            Net amount to be accounted for----,_                                 --                             8, 213, 238. 47
   1Exclusive of available funds.
972         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                      19 3 4

Gross amount expended-----------------------$3, 705, 218. 98
Less reimbursements collected------------------- 75, 328. 95
                                                                $3, 629,                            890. 03
      Balance unexpended June 30, 1934---------------------- 4, 583,                                348. 44
Outstanding liabilities June 30, 1934------------- $31, 787. 61
Amount covered by uncompleted contracts-------- 3, 774, 711. 41
                                                                 3, 806.                            499. 02
      Balance available June 30, 1934-------------------------      776,                            849.42
Accounts receivable June 30, 1934-----------------------------      106,                            391. 14

     Unobligated balance available June 30, 1934--------------                                883, 240. 56
Amount allotted by Public Works Administration Emergency Ap-
propriation Act, fiscal year 1935______                                                    2. 575, 000. 00
     Balance available for fiscal year 1935-----------------                                3, 458, 240. 56
Amount (estimated) required to be appropriated for completion
of existing project ----------------------------------------                               5, 325, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1936 for new work 1- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -    1,653, 000. 00
6. OPERATING AND CARE OF LOCKS AND DAMS ON KANAWHA RIVER,
                           W. VA.

   The improvement for which report is made under this caption
forms a part of the project for the improvement of Kanawha
River, W. Va.             (See pages 965 to 972, where general information re-
garding the improvement can be found.) The completed locks and
dams have been operated and maintained under the permanent
indefinite appropriation. (See Existing project, p. 965.)
   Opeirations and results during fiscal year.-The locks and dams
were operated as required and the necessary repairs made thereto and
to the appurtenant structures. The cost of maintenance during the
fiscal year was $239,551.14.                 The expenditures were $211,694.18.
  Condition at end of fiscal year.-Old Locks Nos. 3,4, and 5 have
been abandoned, having been replaced by recently completed Locks
Nos. 2 and 3. Old Lock No. 2 will be abandoned the first part of the
fiscal year 1935.           Old Locks Nos. 6 to 11, inclusive, are in fair con-
dition and with some repairs will fairly well meet the needs of navi-
gation until the new locks under construction are completed. The
total cost for operation and maintenance at the close of the fiscal year
was $4,909,127.97. The total expenditures were $4,926,771.51.
  Proposed operations.-The locks and dams will be operated and
maintained under allotments from appropriations made available for
such purposes.
                                   Cost and financial summary

Cost of maintenance to June 30, 1934------------------------ $4, 909, 127. 97
Value of plant, materials, etc., on hand June 30, 1934----------  23, 121. 10

      Net total cost to June 30, 1934                              932, 249. 07
                                                                4--------------------------,
Plus accounts receivable June 30, 1934 ------------------------       3, 829. 72

     Gross total costs to June 30, 1934----------------------4, 936, 078. 79
Minus accounts payable June 30, 1934------------------------      9, 307. 28

     Net total expenditures---------------------------------                                4,926, 771. 51
Unexpended balance June 30, 1934_                                                              23, 095. 81

          Total amount appropriated to June 30, 1934-------------                           4,949, 867. 32
   1   Exclusive of available funds.
            RIVERS AND HARBORS-I-UNTINGTON,                                    W.    VA., DISTRICT              973

    Fiscal year ending June 30              1930            1931            1932            1933             1934


Cost of new work-..............        --------------.--------.----------------------------------.--------------
                                                         .
Cost of maintenance-----------..   _     $190, 613. 75   $253, 062. 47   $299, 389. 18   $229, 642. 70     $239, 551. 14

Total expended---....------------         164, 681. 08    314, 841. 27    311, 466. 39    148, 293. 57      211, 694. 18

Allotted ------------------------         160, 800. 00    270, 945. 09    361, 934. 29    130, 064. 22      199, 400. 27


Balance unexpended July 1, 1933____                                                                      $35, 389.72
Amount allotted from permanent indefinite appropriation, sec.
6, River and Harbor Act, Mar. 3, 1909_                                                                  213, 500. 00

      Amount to be accounted for--___        -_______-                                                   248, 889. 72
Deductions on account of revocation of impounded funds.......                                             14, 099. 73
      Net amount to be accounted for ..       __                                                         234, 789. 99
Gross amount expended ________--        -__________ $233, 664.98
Less:
    Reimbursements collected ___-.__-     $8, 103. 12
    Receipts from sales-____-___-         13, 867. 68
                                                      21, 970. 80
                                                                                                         211, 694. 18
      Balance unexpended June 30, 1934__       ____________                                               23, 095. 81
Outstanding liabilities June 30, 1934_____________ $22, 922. 52
Amount covered by uncompleted contracts --------        102. 75
                                                                                                          23. 025. 27
      Balance available June 30, 1934       ____------------70.                                                   54
Accouints receivable June 30, 1934__ - ------     __             ----
                                                                __                           __-           3, 829.72

     Unobligated balance available June 30, 1934_--__-         -___   3, 900. 26
Amournt allotted for fiscal year 1935-------------------------      216, 000. 00

          Balance available for fiscal year 1935------------------                                       219, 900. 26

7. OPERATING AND CARE OF LOCKS AND DAMS ON BIG SANDY RIVER
        W. VA. and KY., INCLUDING LEVISA AND TUG FORKS

   Location.-Big Sandy River, 27 miles in length, is formed by the
junction of the Levisa and Tug Forks at Louisa, Ky., flows in a
northerly direction, and empties into the Ohio River at Catlettsburg,
Ky. Levisa Fork, 160 miles in length, rises in southwestern Vir-
ginia, and flows in a general northerly direction; and Tug Fork, 154
miles in length, rises in southwestern West Virginia, and flows in a
general northwesterly direction.
   Previous projects.-Adopted by act of July 18, 1878, and modi-
fied by acts of June 14, 1880, and July 13, 1892. Total cost and ex-
penditures on original and modified projects were $380,431.10r i: (For
further details see Annual Report for 1915, p. 1929.)
   Existing project.-This provides for three locks and dams= on, the
main river, two locks and dams each on Levisa Fork and Tug Fork,
and regulating works below Lock No. 1, reaching to the Ohio River.
Only the three locks and dams on the main river and the lower lock
and dam on each fork have been constructed. The existing im-
provement gives a connection with pool formed by Dam No. 29,
Ohio River, a slack-water depth of 6 feet from the Ohio River to
Louisa, Ky., 27 miles, and thence to Cox Branch on Levisa Fork and
to Bear Branch on Tug Fork, 17.5 and 12.5 miles, respectively, above
Louisa.
974        REPORT          OF CHIEF               OF ENGINEERS,                  U. S. ARMY, 1934

  The clearing of the forks above slack-water limits to Pikeville on
Levisa Fork and to Pond Creek on Tug Fork is also included in the
project.
  The estimate of cost for new work, revised in 1928, is $2,256,800..
The completed locks and dams have been operated and maintained
under the permanent indefinite appropriation since the date given
opposite each:
        No.   1.   Big Sandy, February 1, 1905.
        No.   2.   Big Sandy, May 10, 1905.
        No.   3.   Big Sandy, January 1, 1897.
        No.   1.   Levisa Fork, January 1, 1910.
        No.   1.   Tug Fork, January 1, 1910.
   The existing project was authorized by the following river and
harbor acts: The act of June 14, 1880, provided for the construction
of lock and fixed dam near Louisa, Ky.; the act of July 13, 1892,,
substituted a movable dam at lock near Louisa, Ky. (H. Doc. No. 25,.
52d Cong., 1st sess.); act of March 3, 1899, provided for construc-
tion of two locks and dams on main stream (H. Doc. No. 456, 55th
Cong., 2d sess.); act of June 13, 1902, provided for removal of"
obstructions and construction of one lock and movable dam each
on Levisa and Tug Forks, and raising crest of Dam No. 3; act of
March 3, 1905, provided for regulating works at mouth of river;
act of March 2, 1907, provided for the construction of a service
bridge at Dam No. 1, and the act of June 25, 1910, provided for the
construction of an additional lock and dam each on Levisa and
Tug Forks. (An index map of Big Sandy River and Levisa and
Tug Forks is printed in H. Doc. No. 235, 56th Cong., 2d sess.)
  The following table gives the characteristics of the locks and
dams included in this report:

                                           Lock


              Location                Dimensions
Lock                      -            __0
and                           a                                                       Dam-Type           '
Dam
No:.
                              o
                              w        0                               Founda-
                                                                                      of construc-
                                                                                          tion 1         a
                                                                                                                     c
        Nearest town            g                               o         tion




                              Miles Feet       Feet    Feet     Feet
1     Catlettsburg, Ky-       0.3 55.0       160.0    13. 5    9. O Sandstone. Needle pass             1905    $318, 417. 64
                                                                                       wicket weir.
2     Buchanan, Ky___        12.9    55.0    160.0    12. 6     6.0 ___do ..... _____do        ____
                                                                                                 -       1905    278, 893. 10
3
1L.
2L
       Fort Gay, W. Va
       Gallup, Ky...__-
       Richardson, Ky_
                              26. 6
                              35. 4
                              45. 4
                                      52. 0
                                      55. 0
                                      55. 0
                                              158. 0
                                              160.0
                                              160. 0
                                                       10. 6
                                                       11.0
                                                       12. 0
                                                               '8.7
                                                                 7. 8 -do- ...

                                                                ---
                                                                      ___do- ._____...
                                                                         do _
                                                                                     ... do
                                                                                    ._
                                                                                                 -

                                                                                          do__.._____
                                                                                                         1897
                                                                                          do .. ______ 1910
                                                                                                          (2)
                                                                                                                 396, 304. 98
                                                                                                                 250, 128.70
                                                                                                                 545, 000.00
1T    3 miles above          31.0    55.0    160. 0   12. 0     7. 7 Piles in       -... do-..    ... _1910     268, 452. 26
        Louisa, Ky.                                                     gravel.
2T    Webb, W. Va ....       40. 0   55. 0            12. 0 ......   Sandstone-_-.do--- .__.            (2)     507, 500. 00

         1All movable dams.                        2 Not built.                    3Estimated, 1928.

  Recommended modifications of project.-Recommendation was
made September 8, 1914, that the slack-water improvement of the
Tug and Levisa Forks be discontinued (H. Doc. No. 1159, 63d Cong.,
2d sess.).
  Terminal facilities.-Terminal facilities consist of 2 privately
owned terminals, 1 at Kenova, W. Va., and 1 at Leach, Ky.
           RIVERS AND HARBORS-HUNTINGTON, W. VA., DISTRICT                                                           975,
    Operations and results during fisoal year.-The locks and dams
were operated as required and the necessary repairs made thereto
and to the appurtenant structures.
  The cost of maintenance during the fiscal year was $17,400.73. The_
expenditures were $17,405.40.
  Condition at end of fiscal year.-The locks and dams are in poor,
condition but reasonably meet the demands of navigation. The 6-
foot slack-water depth is available for about 7 miles above the
mouth. Above this point the slack-water depth is reduced to 4 feet
or even less. The total cost of the existing project at the end of-
the fiscal year was as follows:
New work------     ------- -----------                  $1, 204, 304. 92
Maintenance--------------------------------------------      64, 857. 66,
From permanent indefinite appropriation ___--_-----...      941, 303. 47

          Total ----          -----------------------------------                                        2,210, 466. 05;
  The expenditures were $2,217,464. 72.
  Proposed operations.-The locks and dams will be operated and
maintained under allotments from appropriations made available,
for such purposes.
                                      Cost and financial suwmary
                              MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934------------------------ $1,584, 736. 08:
Cost of maintenance to June 30, 1934_____11111111111111       64, 857. 66

         Total cost of permanent work to June 30, 1934-                                                      649, 593. 74
                                                                                                        " 1---------

         Net total expenditures----                   -------------------------                          1, 649 593.74

Total amount appropriated to June 30, 1934_-                             ---   ----             -          1,649, 593. 74._

Amount (estimated) required to be appropriated for completion
of existing project----   --------------------------------                                                  052, 500. 00
                                      OPERATING AND CARE FUNDS

                                          ------
Cost of maintenance to June 30, 1934__________                                                             $941, 303. 47
Value of plant, materials, etc., on hand June 30, 1934_ __--_                                                  7, 524. 03;

         Net total cost to June 30, 19349_---__.-----                                           ---         948,827. 50
Plus accounts receivable June 30, 1934-------------------                                           -            560. 47

      Gross total costs to June 30, 1934____---------------                                                 949, 387.97-
Minus accounts payable June 30, 1934-------------------                                                       1, 085. 83

     Net total expenditures____ __---_----------------                                                      948, 302. 14--
Unexpended balance June 30, 1934-------------------                                      ---                  5, 679. 92,

         Total amount appropriated to June 30, 1934 __-__-                            .. .....              953, 982. 06


         Fiscal year ending June 30                1930           1931            1932              1933          1934


Cost ofnew work..----------------------
Cost of maintenance----------------....------- $44, 162. 13    $39, 887. 34    $27. 63. 61     $26,192.38       $17, 400. 73
Total expended-----------------------            43, 111. 19    42, 392. 53     29, 154. 71     22, 559. 34      17, 405. 40
Allotted.---------------.                                    50,000.00
                                                 42,000.00 ,------------- 19, 00o00 -20,152.47-                  20, 842. 39

        91536--ENG 1934--62
976               REPORT                OF CHIEF OF ENGINEERS, U. S. ARIVMY,                                                  1934

Balance unexpended July 1, 1933__________                                                                                             $2, 242. 93
Amount allotted from permanent indefinite appropriation, sec.
  6, River and Harbor Act, Mar. 3, 1909___   ____---
                                            -----                                                                                     23, 800. 00

     Amount to be accounted for__--------------------------                                                                           26, 042. 93
Deductions on account of-
   Revocation of allotment_--------_------------  $1, 866. 36
   Revocation of impounded funds---------------    1, 091. 25
                                                                                                                                       2, 957. 61

      Net amount to be accounted for-----------------------                                                                           23, 085. 32
Gross amount expended____________--------------           $23, 109. 07
Less-
    Reimbursements collected ----------- $3,780. 82
    Receipts from sales----.------------        1, 922. 85
                                                            5, 703. 67
                                                                                                                                      17, 405. 40
      Balance unexpended June 30, 1934 _...____---__-----                                                                              5, 679. 92
Outstanding liabilities June 30, 1934_______________---------                                                                          1, 961. 67

     Balance available June 30, 1934_______________________                                                                            3, 718. 25
Accounts receivable June 30, 1934---------------------------                                                                              560. 47

    Unobligated balance available June 30, 194 ------------                                                                            4, 278. 72
Amount allotted for fiscal year 1935 ............- __                                                                                 50, 000. 00
             Balance available for fiscal year 1935 ____                                               ______-_---                    54, 278. 72

   8. EXAMINATIONS,                                   SURVEYS,                AND CONTINGENCIES                              (GENERAL)

  The cost of maintenance during the year was $21,829.78. The
expenditures were $23,695.66.
  The balance unexpended, $6,479.43, at the end of the fiscal year,
together with an allotment made during July 1934, will be applied
as needed during the fiscal year 1935 to payment of expenses to be
incurred in connection with the above items. The additional sum
of $25,000 can be profitably expended during the fiscal year ending
June 30, 1936.
                                                         Cost and financial summary

Cost of maintenance to June 30, 1934                  ________-__$258, 734. 32
                                              -___________
Value of plant, materials, etc., on hand June 30, 1934-----------  -- 2, 185.36
      Net total cost to June 30, 1934 ..----------. ___-                                                               __-          256, 548. 96
Minus accounts payable June 30, 1934__--- -------------                                                               ____          --   178. 34
     Net total expenditures ----                                                       __         -___                  ____-256, 370. 62
Unexpended balance June 30, 1934_ .                                             ___.----------------.                          6, 479. 43
             Total amount appropriated to June 30, 1934--------------                                                               262, 850. 05

             Fiscal year. ending June 30                                    1930            1931           1932              1933         1934


Cost of new work-..                                  ----.......-                                                      $-------------------
Cost of maintenance_------------------                                   $43, 390. 22   $81, 834. 55   $48, 970. 93    $36, 186. 83     $21, 829. 78
Total expended-...----.....-------------------                            49, 035. 17    82, 486. 42    49,126. 62      27, 492. 43      23, 695. 66
Allotted............................----------------------------------    50, 000. 00    68, 500. 00    30, 000. 00     38, 673. 11      18, 376. 94

  1Previous cost reduced during the year by $5,631.19 due to an adjustment of excessive
overhead charged.
            RIVERS AND HARBORS-CINCINNATI,                             OHIO1      DISTRICT           977
Balance unexpended July 1, 1933                                $11, 798. 15
Amount allotted from War Department Appropriation Act approved
Mar. 4, 1933 ---   ----------------------                      20, 000. 00

     Amount to be accounted for----------------------------31,                                     798. 15
Deductions on account of revoked impounded savings-                                                623. 06
                                                                                                1-------------,

        Net amount to be accounted for                ------------------------                 30, 175. 09
,Gross amount expended--------------------------$37, 260. 61
Less reimbursements collected-----------------                        ----     13, 564. 95
                                                                                               23, 695. 6k
      Balance unexpended June 30, 1934------------------------ 6, 479. 43
Outstanding liabilities June 30, 1934 -----------------------------    191. 36
      Balance available June 30, 1934 --------------------------    6, 288. 07
Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -   25, 000. 00
   Preliminary examination made in compliance owith the River and
Harbor Act approved July 3, 1930.-Reports dated September 30,
1931, and November 14, 1932, by the district and division engineers,
on preliminary examination of Big Sandy River and Tug and
Levisa Forks, W. Va. and Ky., with a view to completing the slack-
water project on these rivers, required by the River and Harbor Act
approved July 3, 1930, were received. They were reviewed by the
Board of Engineers for Rivers and Harbors, pursuant to law, and
were transmitted to Congress July 17, 1933, but have not yet been
printed. The improvement of these rivers other than by the opera-
tion of the present locks and dams is not deemed advisable at the
present time.
   IMPROVEMENT OF RIVERS AND HARBORS IN THE
           CINCINNATI, OHIO, DISTRICT
  This district comprises the stretch of the Ohio River from about
mile 317.5 below Pittsburgh, which is just below the mouth of the
Big Sandy River, Ky., to about mile 556.2, just above Madison, Ind.,
a distance of about 238.7 miles, and includes Dams Nos. 29 to 39,
inclusive; also all work on the Kentucky River, Ky.
  District engineer, Lt. Col. C. L. Hall, Corps of Engineers.
  Acting division engineer: Lt. Col. R. C. Moore, Corps of Engi-
neers, to July 28, 1933.
  Division engineer: Col. George R. Spalding, Corps of Engineers,
from July 29 to November 27, 1933; Lt. Col. E. L. Daley, Corps of
Engineers, from November 28 to November 30, 1933; Lt. Col. R. G.
Powell, Corps of Engineers, since that date.
                                             IMPROVEMENTS

                                              Page                                                    Page
1. Construction of Locks and                            4. Operating snag boats on the
     Dams Nos. 29-39, Ohio                                  Ohio River_ -------------                  934
     River                                      15. 5. Operating and care of locks
                                               9------------------
2. Operating and care of Locks                                 and dams on Kentucky
     and Dams Nos. 29-39, Ohio                                 River, Ky---------------                978
     River-------------------                  925      6. Examinations, surveys, and
3. Ohio    River  open-channel                                 contingencies (general) __-             981
      work _------                       -     927
   1-4. For reports on these improvements see page 915.
  1Exclusive    of available funds.
 978          REPORT           OF     CHIEF       OF     ENGINEERS,              U.    S.   ARMY,   1934


      5. OPERATING AND CARE OF LOCKS AND DAMS ON KENTUCKY
                                                       RIVER, KY.

   Location.-The Kentucky River is formed by the confluence of its
north and middle forks about 4 miles east of the town of Beattyville
in east central Kentucky, the south fork joining the main stream at
that place. (See U. S. Geological Survey chart for State of Ken-
tucky; scale, 1: 500,000.)
   Existing project.-The project provides for 14 locks and fixed
dams to give, in connection with the improvement of the Ohio River,
slack-water navigation of 6 feet minimum depth from the Ohio
River to points on the three forks a short distance above Beattyville,
Ky. The total length of pool water of 6-foot project depth is about.
263 miles. The river ordinarily rises to a height of 50 feet in the
lower part and 30 feet in the upper part. The extreme height due
to floods from Ohio River backwater exceeds 65 feet in lower sec-
tions and occasional floods exceed 40 feet in the upper pools.
   The original estimate of cost, which contemplated the rehabilita-
tion of the State locks and dams and the extension of slack water
to the three forks at Beattyville, was $1,074,402, revised later to
$4,865,550 for its completion. The maintenance of these works is
provided for by annual allotments from the appropriation for oper-
ating and care of canals, etc.
   The existing project was adopted by the River and Harbor Act of
March 3, 1879, in accordance with the report published in House
Document No. 47, Forty-fifth Congress, third session. No map of
the river has been published.
   The following statement shows the characteristics of the several
locks and dams in this project:

                                                  Lock


               Location                    Dimensions

No.                                                   Great-                  Depth            When
                                                         No.
                                                         est                    on              com-        Cost
                                                         a       Liftof       lower Foundation pleted
                                      Miles           avail-      lock        miter
           Nearest town               from     width length                    sill
                                      mouth    width length
                                                       (full
                                                      width
                                                     of lock)


                                                Feet     Feet     Feet        Feet
11    Carrollton, Ky....--------        4. 0      38       145      8. 2       12. 8  Rock and
                                                                                         clay.
12    Lockport, Ky __-_                31. 0      38       145     13. 9        6. 1 Rock          884           384.86
13    Gest, Ky ____-________           42. 0      38       145     13. 2        6. 5   _do--      1884   $1,350, 384.86
I4    Frankfort, Ky- ----        __    65. 0      38       145     13. 2        6.7 ___do--
15    Tyronne, Ky__-- _____            82. 2      36       145     15. 0        6. 4 .do
16    Salvisa, Ky.......-----------    96. 2      52       147     14. 0        6. 4 Rock and     1894     314, 846. 70
                                                                                        piles.
17   High Bridge, Ky- ...            117. 0      52      147      15.   3      6. 9 Rock--.... 1897       290, 768.44
18   Little Hickman, Ky.__           139. 9      52      146      18.   7      6. 0 ___do.....---1900     275, 463. 14
39   Valley View, Ky.... _           157. 5      52      148      17.   3      6. 6 ___do. . ..- 1903     237,645.75
310   Ford, Ky _________....          176. 4      52      148      17.   O0     6. 0 ___do..---.. 1904     221,499. 58
311   College Hill, Ky ____  ..       201. 0      52      148      18.   0      6. 0 __do--..-. 1906       296, 592. 95
412   Ravenna, Ky__________.          220. 9      52      148      18.   0      6.0 ___do..--..   1910     425, 693. 33
413   Willow, Ky                .     239. 9      52      148      18.   0      7.0 ___do ._..    1915     460, 365. 52,
314   Heidelberg, Ky....-...          249. 0      52      148      18.   0      7. O ___do        1917     392, 902. 06.

1 Fixed dam, crib construction.
SBuilt by the State of Kentucky. Cost is given for repairs by United States only.
8 Fixed dam, concrete construction.
4 Fixed damrn,concrete construction, movable crest.
            RIVERS AND HARBORS-CINCINNATI, OHIO, DISTRICT                               979
    Terminal facilities.-For general merchandise and miscellaneous
freight practically no terminal facilities exist except a wharf boat in
the Ohio River at the mouth of the Kentucky River and a number of
small, poorly kept warehouses along the stream. At and near
Beattyville, large tanks are provided for the storage of oil which
was formerly shipped in barges by the river. A storage tank for
gasoline has been recently completed at Frankfort, Ky., to receive
gasoline by river.
    Operations and results during fiscal year.-The locks and dams
and necessary plant have been maintained in good condition. Some
interruption to traffic was caused by high water, ice, and repairs.
    An allotment of $1,500 was made available March 2, 1933, for the
purchase of approximately 6.7 acres of land damaged as a result of
the construction of Dam No. 13. Necessary title papers to cover this
conveyance were about completed at the end of the year.
    The total expenditures for the year were $84,385.68 for mainte-
nance work by day labor. Cost of work, $142,773.04.
    Condition at end of fiscal ear.-The existing project was com-
pleted in 1917 at a saving of $689,911 under the estimated cost.
The work accomplished under the project has been the rehabilitation
of the five old State locks and dams and the construction of new
Locks and Dams Nos. 6 to 14, inclusive. A slack-water depth of 6
feet now exists from the Ohio River to the head of pool formed by
Dam No. 14, or 263 miles. The year of completion of the various
locks and dams is given in the table in the paragraph " Existing
project." The works have been maintained in good condition.
Necessary repairs and additions have been made and suitable plant
for assisting in the operation and care of the locks and dams has been
provided. The works are now in fairly good condition and afford a
-controlling depth of 6 feet.
   The total expenditures on this project to the end of the fiscal year
are as follows:
2or new work---------------------------------------                          $4, 175, 639. 05
3For operating and care of locks and dams _-----------                 ---    6, 266, 540. 42

        Total------------            --------------- ---------------         10, 442, 179.47
  Proposed operations.-The locks and dams will be operated and
:maintained under allotments from appropriations made available
for such purposes.
                              Cost and ftnancial summary
                       MAINTENANCO      AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934_ ..-----.----...-                __        $4, 175, 639. 05
Cost of maintenance to June 30, 1934
       Total cost of permanent work to June 30, 1934_..........               4, 175, 639. 05

Net total expenditures__----------------------                                4, 175, 639. 05
Unexpended balance June 30, 1934-------------------------                          1, 500. 00
       Total amount appropriated to June 30, 1934-,-----------                4, 177, 139. 05
980          REPORT OF            CHIEF OF ENGINEERS,                          U.    S.    ARMY,          1934


         Fiscal year ending June 30                   1930              1931           1932             1933              1934


Cost of new work...-----
Cost of maintenance-----------                     --------------                                   -                -
Total expended---------------------_---------
Allotted----.--------------------------------------------------------$1,500.00                                       ........

Balance unexpended July 1, 1933                                                                                  $1, 500.00
Outstanding liabilities June 30, 1934________                                      1______________             11,       030. 00
         Balance available June 30, 1934-------------------------                                                        470. 00
                                       OPERATING        AND CARE FUNDS


Cost of maintenance to June 30, 1934_______________________                                              $6, 098, 740.38
Value of plant, materials, etc., on hand June 30, 1934                               ----------              169, 538.58
      Net total cost to June 30, 1934__________________________                                            6, 268, 278.96
Plus accounts receivable June 30, 1934 ________-_____________                                                   -45    90

      Gross total costs to June 30, 1934_____________________                                              6, 268. 732.86
Minus accounts payable June 30, 1934 ____ ___________________                                                   2, 192.44
     Net total expenditures----                                        __________________                  6, 266, 540.42
Unexpended balance June 30, 1934-....                                                                          62, 958. 79
         Total amount appropriated to June 30, 1934____________                                            6, 329, 499. 21

         Fiscal year ending June 30                   1930              1931           1932             1933              1934


Cost of new work-- .------------------                       --------------------------------------------
Cost of maintenance-----------------               193, 848. 36 $211, 651. 65 $169, 510. 52 $176, 719. 71            $142, 773. 04
Total expended---------------------                228, 978. 44     216, 067. 83     87, 134. 84   62, 842. 83           84, 385. 68

Allotted--------     ------------------------      250, 000. 00 180, 000. 00        117, 516. 72   97, 115. 31           59, 780. 85


Balance unexpended July 1, 1933 __--                                                                           $87, 563. 62
Amount allotted from permanent indefinite appropriation, sec. 6,
River and Harbor Act, Mar. 3, 1909--------------64,                                                                     500.00

     Amount to be accounted for- ___---------____         ------                                               152, 063.62
Deductions on account of revocation :of impounded funds-------                                                   4, 719. 15

      Net amount to be accounted for ___                                       _                               147, 344.47
Gross amount expended_________-
                              -      __- __--
                                         -                                     -    $145,519.66
Less:
    Reimbursements collected                    --------
                                        $57, 406.                              22
    Receipts from sales ____- ________     3, 727.                             76
                                                                                       61, 133.98
                                                                                                                 84, 385.68
Balance unexpended June 30, 1934___________                                                                      62, 958.79
Outstanding liabilities June 30, 1934_                                                 $3, 012. 22
Amount covered by uncompleted contracts--------                                         3, 821. 81
                                                                                                                         .03.
                                                                                                                  6 , 834....

        Balance available June 30, 1934______     -_____________                                                 56, 124. 76
Accou   nts receivable June 30, 1934 ___. ___.___-____________-                                                      453. 90
      Unobligated balance available June 30, 1.934                                  -----------                  56, 578.66
Amou nt allotted for fiscal year 1935_ .________-____________                                                    80, 000. 00
         Balance available for fiscal year 1935__---____-                                     -_____           136, 578. 66
            RIVERS AND HARBORS-CINCINNATI,                                       OHIO, DISTRICT                        981
    6. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                     (GENERAL)

   The cost of work during the year amounted to $40,341.02; the ex-
penditures were $39,005.10. The balance unexpended June 30, 1934,
$3,571.20, together with an allotment made during July 1934 will be
applied as needed during fiscal year 1935 to payment of expenses to
be incurred in connection with the above items. The additional sum
of $21,000 can be profitably expended during the fiscal year ending
June 30, 1936.
                                           Cost and financial summary
Cost of maintenance to June 30, 1934___________________-     _ $152, 087.49
Value of plant, materials, etc., on hand June 30, 1934___ -___-- -705. 08
      Net total cost to June 30, 1934 ____ -___-   -___-_____ 151, 382. 41
Minus accounts payable Julie 30, 1934----------------___--      1, 158. 86
      Net total expenditures_    - ____-                         _________        _ - __-- -  150, 223. 55
Unexpetided balance June 30, 1934_______                                   -___________ -______ 3, 571. 20
         Total amount appropriated to June 30, 1934 _____--___-                                              153, 794. 75

        Fiscal year ending June 30                   1930           1931             1932            1933           1934


Cost of new work_----------------__---------
Cost of maintenance___------------------$20, 526. 64             $25, 387. 40   $33, 104. 43      '$27, 509.16    $40, 341. 02
Total expended   -----------------------           20, 779. 61    25, 532. 67     31, 980. 99      28, 169. 85     39, 005. 10
Allotted .....--..-------------------------        24, 600. 00    34, 700. 00     13, 500. 00      28, 485. 01     33, 759. 74



Balance unexpended July 1, 1933           ________  __-_--__      _ $8,816.56
Amount allotted from War Department Appropriation
  Act approved July 14, 1932___________--        _-     $1, 200. 00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933 ____________--______-33, 500. 00
                                                                    34, 700. 00
     Amount to be accounted for _______--__---___-43,                                                              516. 56
Deductions on account of revocation of impounded funds----------                                                   940. 26
      Net amount to be accounted for_____        ____---------42, 576. 30
Gross amount expended_______________--_________ $39, 021.38
Less reimbursements collected-------------------  ----  -16:28
                                                               39, 005. 10
      Balance unexpended June 30, 1934___ ________--------3, 571. 20
Outstanding liabilities June 30, 1934______-- --------------- 1, 158. 86

         Balance available June 30, 1934 ..--                                   ___------------         -        2, 412. 34

Amount that can be profitably expended in fiscal year ending June
                                          _ _
                               -   --
30, 1936, for maintenance 1_____________                 _____-  21, 000. 00
  Preliminary examination required by River and Harbor Act ap-
proved July 3, 1930.-The local engineer was charged with the duty
of making a preliminary examination and survey of the Great
Miami River, Ohio, provided for by the River and Harbor Act ap-
proved July 3, 1930. Reports dated May 15, 1931, and November
21, 1931, by the district and division engineers on preliminary exam-
   1-Exclusive of available funds.
982      REPORT OF CHIEF OF ENGINEERS,             U.   S.   ARMY,   1934


ination were received but held in abeyance by the Board of Engi-
neers for Rivers and Harbors at the request of local interests. On
July 26, 1934, these reports were returned to the division engineer
for a new report.
   IMPROVEMENT OF RIVERS AND HARBORS IN THE
            LOUISVILLE, KY., DISTRICT

    This district comprises that portion of the Ohio River between a
-point 1.5  miles above Madison, Ind., and Mound City, Ill., including
Dams Nos. 41 (with the Louisville and Portland Canal) to 54, the
portions of Indiana and Illinois within the watersheds of all streams
flowing into the portion of the Ohio River above stated, and that
part of Kentucky between the watersheds of the Kentucky and
Cumberland Rivers.
    District engineer: Lt. Col. W. A. Johnson, Corps of Engineers, to
November 15; Capt. T. F. Kern, Corps of Engineers, acting district
engineer, November 16-27; and Lt. Col. Gilbert Van B. Wilkes,
'Corps of Engineers, since that date.
    Division engineer: Lt. Col. R. C. Moore, Corps of Engineers, act-
ing division engineer to July 28; Col. George R. Spalding, Corps of
Engineers, July 29 to November 27; Lt. Col. E. L. Daley, Corps of
Engineers, November 28-30; and Lt. Col. R. G. Powell, Corps of
Engineers, since that date.
                                  IMPROVEMENTS

                                   Page                                      Page
1. Locks and Dams Nos. 41 and             5. Operating and care of locks
      43-53, Ohio River ----    __   915        and dams on Green and
'2. Operating and care of Locks                 Barren Rivers, Ky--------    989
      and Dams Nos. 41 (includ-            6. Operating and care of lock
      ing Louisville and Portland               and dam on Rough River,
      Canal), and 43-53, Ohio                   Ky _________-__-
                                                              -       ___    990
      RivJer----------             - 925   7. Examinations, surveys, and
3. Ohio River, open channel                    contingencies (general) __   992
      work ___---__-         --      927   8. Other projects for which no
-4. Green and Barren River and                  estimates are submitted___   993
      Bear Creek, Ky-----------982
   1-3. For reports on these improvements see page 915.
        4. GREEN AND BARREN RIVERS AND BEAR CREEK, KY.

   Location.-Green River rises in Casey County, Ky., flows in a
northwesterly direction 370 miles, and empties into the Ohio River
:about 8 miles above Evansville, Ind.
   Barren River rises in Monroe County, Ky., flows in a northwest-
erly direction 130 miles, and empties into Green River one-half mile
above Lock No. 4 and 149.5 miles above the mouth of Green River.
   Bear Creek rises in Grayson County, Ky., flows in a southerly
direction 40 miles, and empties into Green River 0.3 mile above
new Lock No. 5 and 168.4 miles above the mouth of Green River.
   Existing project.-The purchase by the United States in 1888 of
the then existing improvements made by the State of Kentucky on
Green and Barren Rivers committed the Government, under sec-
                RIVERS AND HARBORS-LOUISVILLE,                                          KY., DISTRICT                      983

tion 4 of the River and Harbor Act of July 5, 1884, to the operation
and maintenance of the system, including operation of the locks,
removal of snags, landslides, etc., from the channels of the streams,
restoration of unserviceable structures, and construction of new ones
where needed. This project was subsequently modified by extend-
ing slack-water navigation from the upper limits of Pool No. 4 to
Mammoth Cave, Ky. (Green River above the mouth of Big Barren
River), by the construction of two additional locks and dams, nos.
5 and 6.
   The River and Harbor Act of July 3, 1930, further modified the
project to provide for locks 56 feet wide and 360 feet long in Dam
No. 5, Green River, and in Dam No. 1, Barren River, and for cap-
ping Dam No. 5 with concrete and raising its crest 2 feet with a
movable A-frame top (Rivers and Harbors Committee Doc. No. 2,
71st Cong., 1st sess.), and to include the improvement of Bear Creek,
Ky., by widening the bends (H. Doc. No. 685, 69th Cong., 2d sess.).                                                                   i
   Improvement of Green River extends from the mouth to Mam-
moth Cave, Ky., a distance of 197.8 miles; of Barren River from
the mouth to Bowling Green, Ky., a distance of 30.1 miles; and of
Bear Creek, Ky., for a distance of 8 miles above the mouth.
   Fluctuations in stage due to floods vary considerably at the differ-
ent locks. At Lock No. 3, Green River, ordinary fluctuations from
this cause vary from 12 to 15 feet above pool level, with maximum
stage of about 28 feet above pool stage reached in 1913. At Lock
No. 1, Barren River, fluctuations due to floods vary from 7 to 10 feet
above pool level. During the flood of 1913 the stage reached about
31 feet above pool stage.
   The principal data concerning the locks and dams are shown in
the following table:

                              Location                                            Greatest                   Depth      Depth
Lock                                                                 Width       length       Lift at      on lower on upper
  and                                                Distance         of lock     oflock      normal        mitersill mitersill
Dam-                 Nearest town                         from        chamber     forfull      pool         at normal at normal
                                                     mouth of                     width                     pool level pool level
                                                          river

                     GREEN RIVER
                                                          Miles        Feet         Feet        Feet          Feet        Feet
No.   1__   At Spottsville, Ky____ ___--_                      9. 1      35.5        139        1 11.   1       9. 7-        6.7
No.   2__   At Rumsey, Ky__-__________                        63.1       36.0        141          14.   3       5. 5         7. 8
No.   3__   At Rochester, Ky_     --------
                                   ____                      108. 5      35. 8       137. 5       17.   0       5. 6         7. 3
No.   4._   At Woodbury, Ky-__- -- ___-                  -149. 0         35. 8       138          16.   4       6. 5         7. 1
N     d
      51    0.6mile from Glenmore, Ky.....                   167. 9      36. 0       145          13.   3       5. 1         7. 7
No.5       0.8mile from Glenmore, Ky.. .                   168. 1       56. 0       360          15. 2         9. 3         12. 0
No. 6__ 1.4 miles above Brownsville, Ky_                    181. 7       36. O0      145        3 11. 1        4 6. 9         8. 0

                     BARREN RIVER

No. 1..     Greencastle, Ky.-.-              ..---
                                                     {        15
                                                           5 164. 5
                                                                         36. 0
                                                                         56
                                                                                     140
                                                                                     360
                                                                                                  15. 2
                                                                                                  15. 2
                                                                                                                4. 7
                                                                                                                9. 3
                                                                                                                              7.3
                                                                                                                             12. O0

1 At normal pool, Dam 48, Ohio River.
2 To be removed upon completion of new Lock and Dam No.'5.
3 New Dam No. 5 will be provided with a crest elevation 1.9 feet higher than present Dam No. 5, which
will decrease lift to 9.2 feet.
  4New Dam No. 5 will increase depth to 8.8 feet.
  &From mouth of Green River.
984            REPORT          OF CHIEF            OF ENGINEERS,                  U.    S. ARMY,        1934


                                                                                               Per-
Lock                                              Kind                                        cent-     Year       Cost of
and            Character of foundation             dam            Type of construction         age      com-      lock and
Dam-                                                                                           com-     pleted        dam
                                                                                              pleted


                      GREEN RIVER

No. 1___     Shale and coal... ___________ Fixed_ Wood crib, concrete cap___                   ---      1835-40      $179, 110
No. 2___     Shale ________ ______________   __do      Wood crib_               ......                    1895        295, 696
No. 3___     Rock-..........                 do -- .... do ------ --                                    1833-36       121,377
No. 4        ---. do ....                    do-.      ..- do      --------.......                        1839        125, 718
0 1 d        Gravel            --        ___ do .......-   do_                                            1899        179, 435
No.52
N e w        Piles and rock- .......     .   ...     do 6            do_            -              93   .          8 1,126, 733
  No. 5_
No. 6__ Gravel __________              ______      __do._        Wood crib, concrete cap___.--------        1905      168, 415
                     BARREN RIVER

:Nio.   1.         in gravel   ._
                               _                   .. do .....      do ---_---------------         98       1841   791,131,677


  2 To be removed upon completion of new Lock and Dam No. 5.
  6 With movable A-frame crest 3 feet high.
  7 Estimated.
  8Includes $4,033.50 for purchase of land.
   Includes $1,800 for purchase of land.

   The original improvements were purchased at a cost of $135,000,
the cost of operating the system and restoring or replacing the origi-
nal structures, except Lock No. 2, Green River, being provided for
by annual estimates and allotments for the purpose. The rebuilding
of Lock No. 2 and the extension of the system by the construction of
Locks and Dams Nos. 5 and 6, Green River, were provided for by
specific appropriations. The original estimate for the reconstruction
of Lock No. 2 was $130,000 (Report for 1891, p. 2439), subsequently
increased to $170,000. The original estimate for the extension of the
system by the construction of Locks Nos. 5 and 6, Green River, was
$361,346.40 (Report for 1891, p. 2481), subsequently increased to
$365,673.20, the latter sum including an authorization of not exceed-
ing $5,000 for snagging and clearing the banks of that part of Nolin
River affected by slack water from Dam No. 6, Green River.
   The estimated cost of new locks at Dam No. 5, Green River, and
Dam No. 1, Barren River, was $2,116,112 and of the work in Bear
Creek $23,000, of which $10,000 is to be contributed by local interests.
   The total estimated cost of new work, revised in 1930, is $2,819,540.
   The maintenance of these works, except the work in Bear Creek, is
provided for by annual allotments from the appropriation for oper-
ating and care of canals, etc. The estimated cost of maintenance of
the channel in Bear Creek is $500 per annum.
   The existing project was authorized by the following acts: The
River and Harbor Act of August 11, 1888, provided for the purchase
of the original improvements (House Ex. Doc. No. 111, 49th Cong.,
2d sess.) ; the Deficiency Act of March 3, 1893, provided for building
Lock No. 2, Green River (Annual Report for 1891, p. 2439); the
River and Harbor Act of July 13, 1892, provided for the construc-
tion of Lock No. 5, Green River, and the River and Harbor Act of
June 13, 1902, for the construction of Lock No. 6, Green River (An-
nual Report for 1891, pp. 2478 and 2481). The River and Harbor
Act of March 3, 1905, contained an appropriation for $5,000 for con-
tinuing the improvement of Green River above the mouth of Big
Barren River, with the following proviso:
          RIVERS AND HARBORS-LOUISVILLE,          KY., DISTRICT       985
  That the Secretary of War may, in his discretion, expend such portion of
said amount as may be necessary for removal of snags in Nolin River.
     The River and Harbor Act of July 3, 1930, authorized the con-
struction of new locks at Dam No. 5, Green River, and Dam No. 1,
Barren River, the modification of Dam No. 5, Green River, and the
widening of bends in Bear Creek, Ky. (Rivers and Harbors Coin-
mittee Doc. No. 2, 71st Cong., 1st sess., and H. Doc. No. 685, 69th
'Cong., 2d sess.)
     Reconmmended odifications of project.-Under date of October 10,
1932, the Chief of Engineers recommended the improvement of Nolin
River, Ky., as a modification of the project for Green and Barren
Rivers to provide for removal of obstructive bars, boulders, over-
hanging rocks, and snags from the mouth to Meredith Ferry, a dis-
tance of 73/4 miles, at an estimated cost of $15,000 with maintenance
estimated at $1,000 annually in addition to that now required, sub-
ject to the condition that no expense shall be incurred by the United
States for the acquiring of any lands or easements required for the
purpose of the improvement. (H. Doc. No. 480, 72d Cong., 2d sess.)
     Local cooperation.-The River and Harbor Act of July 3, 1930,
provides that in connection with the improvement of Bear Creek,
Ky., local interests are to contribute $10,000 to the first cost of the
,dredging, provide necessary rights-of-way at the bends, furnish
without cost to the United States satisfactory areas for the disposal
.of excavated material, and assume all flowage damages along Bear
,Creek.    These conditions have not been met.
     Terminal facilities.-On the lower part of Green River 4 ter-
minals are used for loading coal, 2 for transferring asphalt from
barge to rail, 1 terminal for receiving logs, and 2 used for repair of
boats and barges. 'On the upper part of Green River and on Bear
Creek and Nolin River (tributaries of Green River) there are three
terminals for loading asphalt. Terminals on Barren River are at
Bowling Green, Ky., and consist of 2 terminals for transfer of as-
phalt from barge to railroad, 1 sand and gravel receiving point, and
2 paved wharves. One of the wharves is open to the public. At
various points along Green and Barren Rivers there are also about
50 privately controlled unimproved landings. These facilities are
considered adequate for existing commerce. (See H. Doc. No. 81,
73d Cong., 1st sess., for a description of the terminals.)
     Operations and results during fiscal year.-Work under regular
allotments consisted of completing by contract a new lock, except the
operation building, started during the fiscal year 1933 at Dam No. 1,
Barren River; continuing the construction of new Lock and Dam No.
  5, Green River, work on which was begun during the fiscal year 1933;
dredging the upper approach to new Lock No. 5, Green River, by
  contract; and dredging the lower approach to this lock by hired
labor. The costs during the fiscal year were $1,299,305.84 for new
work and the expenditures were $1,290,046.35.
     Preparations were made for beginning work under Public Works
allotment for removing the old dam and dredging between the old
and new dams. There were no costs. The expenditures were
 $327.10.
986      REPORT        OF    CHIEF OF ENGINEERS,            U.   S.   ARMY,   1934

   Condition at end of fiscal year.-The system as a whole is in only
fair condition. Reconstruction of Lock No. 1, Barren River, is
complete, except the operation building, and reconstruction of Lock
and Dam No. 5, Green River, is 93 percent complete.
   The system comprises seven locks, with fixed dams, and affords
through navigation throughout the year for boats of 5-foot draft or
less, and not exceeding 138 feet in length and 35 feet in width, from
Lock No. 1, Green River, to Mammoth Cave, a distance of 1871/2
miles, or from Lock No. 1, Green River, to Bowling Green, Ky., on
Barren River, a distance of 171 miles. Through navigation to the
Ohio River is afforded at all seasons as a result of the pool created
by Lock and Dam No. 48, Ohio River, which provides a low-water
depth of 9.3 feet on the lower miter sill of Lock No. 1, Green River.
Bear Creek is obstructed by snags and sharp bends. The work
remaining to be done to complete the project is to complete Lock and
Dam No. 5, Green River, operation building at Lock No. 1, Barren
River, and the work in Bear Creek with regular funds and the
removal of old Lock and Dam No. 5 and dredging between the old
and news dams with Public Works funds.
   The total costs under the existing project up to the end of the
fiscal year were as follows:
New work---      --                          --------------        $2, 180, 242. 15
Maintenance (removal of snags and deposits from Nolin River
  and Bear Creek, Ky.) --___-__-------------          ------------       1, 060. 27

       Total ----------------------------------                                2, 181, 302.42
   The total expenditures were $2,143,000.81 from regular funds and
$327.10 from Public Works funds.
   Proposedoperations-reglarfunds.-The balance unexpended, in-
cluding accounts receivable at the end of the year and including an
allotment of $80,000 made during August 1934, will be applied as
follows:
Accounts payable June 30, 1934_----------------____              _ $45, 576. 16
New work:
    Completion of Lock and Dam No. 5, Green River,
      by contract (July to October 1934)-----------$112, 706. 84
    Completion of operation building at Lock No. 1,
      Barren River, by contract (July to September
      1934) --   ---------------------------------- 20, 775. 38
    Operation building at Lock No. 5, Green River, by
      contract (September to October 1934)---------    22, 000. 00
                                                                   155, 482. 22

       Total --------------------------------------------                        201, 058. 38
  National IndustrialRecovery Act fuvnds.-The balance unexpended
at the end of the year will be applied to the removal of existing Lock
and Dam No. 5, Green River, and dredging lower approach to new
Lock No. 5, during the period July to October 1934.
   No additional funds can be profitably expended during the fiscal
year 1936.
                RIVERS AND HARBORS-LOUISVILLE,                                        KY., DISTRICT                         987
                                         Cost and financial summary
                                MAINTENANCE                 AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934-----------------___--                                                     $2, 180, 242. 15
Cost of maintenance to June 30, 1934-- ----- -----------                                                      - 1, 060.27
      Total cost of permanent work to June 30, 1934-........      2, 181, 302. 42
Value of plant, materials, etc., on hand June 30, 1934-----------      7, 192. 05
      Net total cost to June 30, 1934 __-----------------                                                    2, 188, 494. 47
Plus accounts receivable June 30, 1934_-..........        ____                                  ___                   82. 50
      Gross total costs to June 30, 1934  __     --    -      2, 188, 576. 97
Minus accounts payable June 30, 1934 ------------------------     45, 576. 16
      Net total expenditures _____-- - - -        -__
Unexpended balance June 30, 1934__-----------------------
                                                          -2, 143, 000. 81
                                                              120, 975. 88
                                                                                                  ___-
          Total amount appropriated to June 30, 1934_ ...                                __-__--             2, 263, 976. 69

    Fiscal year ending June 30                  1930                1931          1932               1933               1934


Cost of new work-.....--_               _    ____....____     _   $11, 633. 63   $8, 711. 11     $190, 163. 41     $1, 299, 305. 84
Cost of maintenance....------...
Total expended                                 ____________
                            __.......................    ..        11, 489. 96    8, 854. 78      161, 121. 29      1, 290, 046. 35
Allotted--....---...........__ __    --------------
                                           ..                      20, 000. 00    -             1, 574, 321. 48       -2,   272. 95



Balance unexpended July 1, 1933_________________________  $1, 413,295. 18
Amount allotted from War Department Appropriation Act ap-
proved Feb. 23, 1927--------------                   ---         750. 00
     Amount to be accounted for________________----_          1, 414, 045. 18
Deductions on account of revocation of impounded funds-------      3, 022. 95

      Net amount to be accounted for____________---__                                                        1, 411, 022. 23
Gross amount expended -------------------- $1,291, 426. 37
Less reimbursements collected------------------ 1, 380. 02
                                                                                                             1,, 290, 046. 35
      Balance unexpended June 30, 1934 ____----------_____                                                        120, 975. 88
Outstanding liabilities June 30, 1934___------------ $45, 576. 16
Amount covered by uncompleted contracts-------        82, 090. 15
                                                                                                                  127, 666. 31

     Balance available June 30, 1934___ _______       -                                        ___----6,                690.43
Accounts receivable June 30, 1934__ _________________                                                                    82. 50

         Unobligated balance available June 30, 1934------------                                                  -- 6, 607. 93

                                                PUBLIC WORKS FUNDS

Cost of new work to June 30, 1934____________            _____---                                                       --
Cost of maintenance to June 30, 1934________-----------------
Value of plant, materials, etc., on hand June 30, 1934 ... ___                                                        $327. 10
Net total cost to June 30, 1934_-------------------------------                                                        327. 10

Net total expenditures________--                                         ______----327.                                      10
Unexpended balance June 30,. 1934_                                ___________-------------                         59, 672'. 90

         Total amount appropriated to June 30, 1934_ -----                                                         60, 000. 00
988         REPORT         OF    CHIEF OF ENGINEERS,                          U.     S.       ARMY,        19 3 4


         Fiscal year ending June 30                     1930           1931              1932          1933               1934


Cost of new work.------                 -
Cost of maintenance__                                    -              ---                                          "
                                     -------------------------------------------
Total expended...................-------------------                                                                       $327. 10
Allotted----------------------.             ----     ---------- ---------                          -----------.. 60,
                                                                                          __-----------            000. 00

Amount allotted from National Industrial Recovery Act ap-
  proved June 16, 1933__._______________________________                                                         $60, 000. 00
Gross amount expended__      _______-                                                                                 327. 10
         Balance unexpended June 30,                     1934----------------------                               59, 672. 90
CONSOLIDATED         COST      AND FINANCIAL            SUMMARY             FOR    GREEN        AND, BARREN              RIVERS,
                                                       ETC., KY.

Cost of new work to June 30, 1934---------------------------                                               $2, 180, 242. 15
Cost of maintenance to June 30, 1934____________ _______---                                           _          1, 060. 27
      Total cost of permanent work to June 30, 1934________                                                 2, 181, 302. 42
Value of plant, materials, etc., on hand June 30, 1934_________                                                  7,519. 15

      Net total cost to June 30, 1934_----
                                      .........                                   ------ __                 2, 188, 821. 57
                                        ---
Plus accounts receivable June 30, 1934-______                                 _________--                            82. 50

     Gross total costs to June 30, 1934___-____---__         __                                             2, 188, 904. 07
Minus accounts payable June 30, 1934_________        _________                                                  45, 576. 16

     Net total expenditures_____ -                             _________________----2, 143, 327. 91
Unexpended balance June 30, 1934 --                            __-_____---_________-                             180, 648. 78
         Total amount appropriated to June 30, 1934 __________                                              2, 323, 976. 69

    Fiscal year ending June 30                1930             1931               1932              1933                 1934


                    ...
Cost of new work _______________......__________             $11, 633. 63     $8, 711.11         $190, 163.41     $1, 299, 305. 84
Cost ofmaintenance -------------               -                                                -        1.-9
                                                                                                       ,4-          ,        ,
Total expended _________________....____________              11, 489. 96         8. 854:78      '161, 21.29        1, 299.373. 45

Allotted__------_   --------    ______- -------               20, 000. 00 --------              1, 574, 321.48           57, 727. 05


Balance unexpended July 1, 1933_____________________             $1, 413, 295. 18
Amount allotted from War Department Appropri-
ation Act approved Feb. 23, 1927____                  $750. 00
Amount allotted from National Industrial Recov-
ery Act approved June 16, 1933_ ..- ________--      60, 000. 00
                                                                      60, 750. 00

         Amount to be accounted for____                               ____        ___-        ___--         1,474, 045.18
Deductions on account of revocation of impounded funds ---- __                                                      3, 022. 95

      Net amount to be accounted for_____________--                   1, 471, 022. 23
                                                                 -_______
Gross amount expended-----------------------        $1,291, 753. 47
Less reimbursements collected   ___                      1, 380..02
                                                                                                            1, 290, 373. 45

      Balance unexpended June 30, 1934 _---______--__---- -     _      _                                         180, 648. 78
Outstanding liabilities June 30, 1934                       $45, 576. 16
Amount covered by uncompleted contracts--------              82, 090.15
                                                                                                                 127, 666. 31
     Balance available June 30, 1934--------,,--                                                                  52, 982. 47
Accounts receivable June 30, 1934---....-------.                                                                       82. 50

          Unobligated balance available June 30, 1934 --------------                                              53, 064. 97
                        RIVERS AND HARBORS-LOUISVILLE,                                          KY., DISTRICT                        989
     5. OPERATING AND CARE OF LOCKS AND DAMS ON GREEN AND
                       BARREN RIVERS, KY.

   The improvement for which report is made under this caption
forms part of the project for Green and Barren Rivers, and Bear
Creek, Ky. See page 982, where general information regarding the
improvement can be found. The completed locks and dams have been
operated and maintained under the permanent indefinite appropria-
tion since their purchase by the United States in 1888.
   Operations and results during fiscal year.-The work consisted
of maintenance and operation of seven locks and dams and mainte-
nance of the channel by hired labor with Government plant. The
costs were $72,549.98 and the expenditures $74,645.17.
   Condition at end of fiscal year.-The system as a whole is in fair
condition. For details see report on improvement. The total ex-
penditures from the permanent indefinite appropriation were
$3,762,025.73.
   Proposed operations.-The locks and dams will be operated and
maintained under allotments and appropriations made available for
such purposes.
                                                         Cost and financial summary
Cost of maintenance to June 30, 1934__      -                       718, 578. 97
                                                   -_____________------$3,
Value of plant, materials, etc., on hand June 30, 1934 ...            46, 672.36.              -----------
      Net total cost to June 30, 1934_ .. ____--_____                                                    ____             3, 765, 251. 33
Plus accounts receivable June 30, 1934__--------_____------                                                                    3, 467.20

     Gross total costs to June 30, 1934 .-.......---------                                                                3, 768, 718. 53
Minus accounts payable June 30, 1934_--.-.....                                                     ___          __-            6, 692. 80
     Net total expenditures __  ______---    __-___ -     -_                                                              3, 762, 025. 73
Unexpended balance June 30, 1934----------------------------                                                                  15, 651.09
              Total amount appropriated to June 30, 1934__--____-_____                                                    3 777.;:76. 82

      Fiscal year ending June 30                            1930            1931            1932                1933             1934


Cost of new work....------------------------------.
Cost of maintenance--- --------.                         $118,100. 05    $107, 498. 68   $116, 569. 47       $103, 934. 55      $72, 549. 98
Total expended--.......-------------........              107, 132. 06    108, 536. 11    97, 062. 45          82, 840. 94       74, 645. 17

Allotted ........................---------------------    105, 000. 00    110, 000. 00   109, 074. 93          65, 559. 83       71, 145. 28



Balance unexpended July 1, 1933______________-___-     ________  $19, 150. 98
Amount allotted from permanent indefinite appropriation, section
  6, River and Harbor Act, Mar. 3, 1909----------------------     74, 000. 00
     Amount to be accounted for___---_____________________                                                                   93, 150.,98
Deductions on account of revocation of impounded funds--------                                                                2, 854..72

             Net amount to be accounted for____________-                                                 -            -      90, 296. 26
990      REPORT OF CHIEF OF ENGINEERS,             U.   S.   ARMY,    1934

Gross amount expended --------------                         $96, 501.69
Less-
    Reimbursements collected ------------     $21, 838. 52
    Receipts from sales ------------------          18.00
                                                              21, 856. 52
                                                                            $74, 645. 17
      Balance unexpended June 30, 1934--------------------                  15, 651. 09
Outstanding liabilities June 30, 1934_                    ___                6,
                                                                             6__1_______________
                                                                                716. 80
      Balance available June 30, 1934_____       ___________________          8, 934.29
Accounts receivable June 30, 1934___    ______-------_                        3, 467. 20

     Unobligated balance available June 30, 1934 __-----___-_                12, 401. 49
Amount allotted for fiscal year 1935--------------------------               72, 000. 00
      Balance available for fiscal year 1935_______      ___----_            84, 401. 49
6. OPERATING AND CARE OF LOCK AND DAM ON ROUGH RIVER, KY.
   Location.-This stream is one of the principal tributaries of Green
River and lies wholly within the State of Kentucky. It rises in
Hardin County, flows westerly 136 miles, and empties into Green
River at Livermore, 71 miles from the mouth of that river. (See
U. S. Geological Survey Charts, Kentucky quadrangles: Central
City, Hartford, Whitesville.)
   Existing project.--This provides for clearing the river of obstruc-
tions and for the construction of a lock and dam to carry slack water
to Hartford, Ky. The new work provided for having been com-
pleted, the project now contemplates the maintenance of the lock and
dam and keeping the river channel free from snags and other obstruc-
tions to navigation.
   At the lock the ordinary fluctuations due to floods vary from 6 to
10 feet above pool level. During the flood of 1913 a stage of about
20 feet above pool stage was reached.
   The location and principal dimensions, etc., of the lock are as
follows:
Name: Lock No. 1, Rough River.
Nearest town, Livermore, Ky          ---------------------------- miles__      8
Mouth of Rough River, in Green River, Ky ---------------            do__       8
Width of lock chamber----------------------------------feet                   27
Greatest length available for full width--        ----------------- do--  125. 1
Lift at pool stage---------------- ---------------------------- do          9.4
Depth on lower miter sill at pool stage---     ------------------- do..     4. 9
Depth on upper miter sill at pool stage---------------------do--            6. 8
  Character of foundation: Rock.
  Kind of dam: Fixed.
  Type of dam: Wooden, stone-filled crib, stepped.
  Cost of lock and dam: $72,186.35.
  The original estimate for building the proposed lock and dam and
removing obstructions from the river amounted to $56,729.80 (Re-
port for 1885, p. 1901). The project and estimate were subsequently
modified (Reports for 1891, p. 2447, and 1896, p. 2280), changing the
dimensions of the structures and substituting a concrete lock and
abutment for the masonry lock and timber abutment originally pro-
posed. The revised estimate under which the work was undertaken
was as follows:
Cost of lock and dam, etc., complete         .---------------              $96, 556. 05
Clearing banks and channel_ ---      ------------------------                9, 000. 00
       Total ----       ----------------                                    105, 556. 05
          RIVERS AND HARBORS                 LOUISVILLE,    KY., DISTRICT          991
   The maintenance of these works is provided for by annual allot-
ments from the appropriation for operating and care of canals, etc.
   The existing project was adopted by the River and Harbor Act of
September 19, 1890, in accordance with the report published in the
Annual Report for 1885, page 1894. The latest published map of
Rough River is printed in House Document No. 662, Seventy-first
Congress, third session.
   Terminal facilities.-There are no terminal facilities except a few
unimproved private landings. It is believed the facilities are ade-
quate for the existing commerce.
   Operations and results during fiscal year.-The lock was in opera-
tion 350 days and submerged 15 days. The lock gates were cleaned
and painted and the operating machinery cleaned and oiled. Neces-
sary repairs were made to fences and buildings. The cost was
$1,025.48 and the expenditures were $1,043.18.
   Condition at end of fiscal year.-The lock and dam were completed
in 1896 at a cost of $72,186.35 and the removal of the obstructions
contemplated in the project in 1899 at a cost of $9,000. The lock and
dam afford slack-water navigation at pool stage to Hartford, Ky.,
29.3 miles from the mouth of the river, for boats not exceeding 123
feet in length, 27 feet in width, and 4-foot draft. The lock was
opened to navigation December 12, 1896, and has been in operation
since that date. The total costs of operating and care are $53,927.17.
The total expenditures under the existing project up to the end of
the fiscal year, not including outstanding liabilities or contract obli-
gations, were as follows:
For new work-----------------------------       -------------             $105, 500. 00
For maintenance (from the permanent indefinite appropriation) ---           53,905. 17
      Total-------------                 ---------- -------------------     159, 405. 17
  Proposed operations.-The lock and dam will be operated and
maintained under allotments from appropriations made available for
such purposes.
                               Cost and financial summary
                           MAINTENANCE    AND IMPROVEMENT FTUNDS

Cost of new work to June 30, 1934-------------------------$105, 500. 00
Cost of maintenance to June 30, 1934

      Total cost of permanent work to June 30, 1934------------105, 500. 00

Net total expenditures-----------------------_______                        105, 500. 00
Total amount appropriated to June 30, 1934----------------                  105, 500. 00
                                OPERATING AND CART FUNDS

Cost of maintenance to June 30, 1934-------------------------   53, 927. 17
Minus accounts payable June 30, 1934---------------------------      22. 00
     Net total expenditures--------------------------------                  53, 905. 17
Unexpended balance June 30, 1934----                                             193.22
      Total amount appropriated to June 30, 1934---------------              54, 098. 39
      91536-ENG 1934           63
992          REPORT OF CHIEF OF ENGINEERS,                                U.     S. ARMIY,        1934


    Fiscal year ending June 30               1930           1931            1932           1933              1934


Cost ofnew work..
Cost of maintenance----                    228. 09
                                     -.. $1,               $2, 720. 81     $1, 564. 78      132. 11
                                                                                          $1,               $1, 025. 48
T otal expended       __..... .....          1, 318. 09     2, 778. 66      1, 521. 81     1, 202. 53         1,043. 18
Allotted ________    ___        ____--       1, 000. 00     1, 000. 00      1, 600. 00        881. 76        1, 034. 40


Balance unexpended July 1, 1933_ ---------- ---------------------- $202. 00
Amount allotted from permanent indefinite appropriation, section 6,
  River and Harbor Act, Mar. 3, 1909----------------------------- 1,100. 00

     Amount to be accounted for_---------------------------------   1, 302. 00
Deductions on account of revocation of impounded funds-------------     65. 60

      Net amount to be accounted for---------------------------- 1, 236. 40
Gross amount expended------------------------------------------1, 043. 18
      Balance unexpended June 30, 1934 ---------------------------                                           193.22
Outstanding liabilities June 30, 1934_______________________________                                          22. 00
     Balance available June 30, 1934 .                          .-                 -                         171. 22
Amount allotted for fiscal year 1935                                                                       , 200. 00
                                                                                                          1--------------------------

          Balance available for fiscal year 1935                                                          1, 371.22

   7. EXAMINATIONS,                   SURVEYS, AND CONTINGENCIES                               (GENERAL)

   The cost of work during the year amounted to $25,029.92; the
expenditures were $24,510.79. The balance unexpended and ac-
counts receivable, together with an allotment made during July
1934, will be applied during the fiscal year 1.935 to payment of
expenses to be incurred in connection with the above items. The
additional sum of $35,000 can be profitably expended during the
fiscal year 1936.
                                         Cost and financial summary

Cost of maintenance to June 30, 1934--------------------------- $180, 616. 32
Plus accounts receivable June 30, 1934--------------------------       15. 38

         Gross total costs to June 30, 1934____________________                              ___        180, 631. 70
Minus accounts payable June 30, 1934__________________________                                              682. 50
         Net total expenditures ---                                                                     179, 949. 11
Unexpended balance June 30, 1934--------------------------_                                               9, 310. 20
         Total amount appropriated to June 30, 1934-----__                                         _    189, 259. 31

   Fiscal year ending June 30                1930           1931            1932           1933             1934


Cost of new work---------------------------------------
Cost of maintenance                       $4, 939. 06     $13, 915. 86   $104,  24
                                                                             187.        $30, 801. 86      $25,  92
                                                                                                              029.
Total expended      --     -   -            3, 822. 26     13, 554. 25    100, 368. 94    36,650. 49        24, 510. 79
Allotted - --                               5, 000.00      28,000. 00     80, 521. 54     39, 717. 96       29, 219. 81
                RIVERS AND HARBORS                      DULUTH, MINN., DISTRICT                                    993
Balance unexpended July 1, 1933-----                                                                         $4, 601. 18
Amount al!otted from War Department Appropriation Act
  approved July 14, 1932           -               ----------                               $7, 000. 00
Amount allotted from War Department Appropriation Act
  approved Mar. 4, 1933_                    ------------                                    22, 500. 00
                                                                                                             29, 500. 00
       Amount to be accounted for-- _------                                        -__-                      34, 101. 18
Deductions on account of revocation of impounded funds ._._._._                                                  280. 19
      Net amount to be accounted for _____________________________    33, 820. 99
Gross amount expended._________.                   _______24. 876. 53
Less reimbursements collected---------------------------      365. 74
                                                                      24, 510. 79

       Balance unexpended June 30, 1934_                                                                      9, 310. 20
Outstanding liabilities June 30, 1934                                                                             82. 59
                                                                                                                 6-------------

        Balance available June 30, 1934----------------------------                                           8, 627. 61
Accounts receivable June 30, 1934_                _            --                 --                              15. 38

        Unobligated balance available June 30, 1934------------------                                         8, 642. 99
Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1______________________________________ 35, 000. 00

                8. Other projects for whic'h no estimates are ,submitted
                  [Commercial statistics for these projects are given in pt. 2 of report]


                                                            I 'or last    Cost and expenditures to
                                                               full re-           June 30, 1934              Estimated
                 Name of project                           p
                                                               lort see                                      amount re-
                                                               annual                                         quired to
                                                               report                                         complete
                                                                for-       New work         Maintenance


Wabash River, Ind. and Ill.1_                                   1931      2 $814, 712. 07    $109,289.59     Completed.
Tradewater River, Ky____________                                1933         318, 568. 48       1, 500. 00      Do.

1 The above project was abandoned on June 30, 1933.
2 Revoked, fiscal year 1934, $5.25.
3 Revoked, fiscal year 1934, $500.

   Report requested by resolutions of the Committee on Rivers and
Harbors, House of Representatives.-By resolutions of the Committee
on Rivers and Harbors, House of Representatives, adopted Decem-
ber 17, 1930, and July 2, 1934, a review of reports on Saline River,
Ill., printed in House Document No. 11, Sixty-third Congress, first
sesson, was requested. Reports dated October 22, 1932, and January
11, 1933, by the district and division engineers are receiving con-
sideration by the Board of Engineers for Rivers and Harbors. On
July 17, 1934, the division engineer was requested to submit addi-
tional information in regard to these investigations.
   IMPROVEMENT OF RIVERS AND HARBORS IN THE
            DULUTH, MINN., DISTRICT
   This district comprises all harbors and tributary waterways on
the United States side of Lake Superior and Lake of the Woods.
   District engineer: Lt. Col. A. K. B. Lyman, Corps of Engineers.
   Division engineer: Col. E. M. Markham, Corps of Engineers, to
October 18, 1933, and Lt. Col- Max C. Tyler since that date.
   1Exclusive   of available funds.
994     REPORT OF     CHIEF OF       ENGINEERS,    U.   S. ARMY,   1934

                                   IMPROVEMENTS

                                    Page                                     Page
1. Grand Marais Harbor, Minn_        994    9. Grand' Marais, Harbor of
2. Agate Bay Harbor, Minn___         996         Refuge, Mich-----------     10240
3. Duluth-Superior H a r b o r ,           10. Warroad Harbor and River,
    Minn. and Wis-----------         999         Minn-....                   1022
4. Ashland Harbor, Wis-------       1006   11. Baudette Harbor and River,
5. Ontonagon Harbor, Mich__.__      1010         Minn-----------------       1024
6. Keweenaw Waterway, Mich_         1012   12. Examinations, surveys, and
7. Marquette Bay, Harbor of                      contingencies (general)__   1025
    Refuge, Mich______________      1015   13. Other projects for which no
8. Marquette Harbor, Mich ...       1017         estimates are submitted__   1026

                   1. GRAND MARAIS HARBOR, MINN.

  Location.-The harbor is situated on the north shore of Lake
Superior, 106 miles northeast from Duluth, Minn. (See U. S. Lake
Survey Chart No. 9.)
  Existing project.-This provides for rock-filled timber-crib break-
water piers 350 feet in length from the east and west points of" the
bay to narrow the entrance, and for dredging an anchorage area of
26 acres to a depth of 16 feet, referred to low-water datum for Lake
Superior, which is taken at 601.6 feet above mean tide level at New
York. The ordinary variation of water level extends from 0 to +1
foot above low-water datum. The estimate of cost for new work,,
revised in 1898, was $163,954.63. The latest (1928) approved esti-
mate for annual cost of maintenance is $6,000.
   The existing project was adopted by the River and Harbor Act of
March 3, 1879 (H. Ex. Doc. No. 75. 43d Cong., 2d sess.). For latest
published maps see House Document No. 939, Sixtieth Congress, first
session, and Rivers and Harbors Committee Document No. 22,
Seventy-second Congress, first session.
  Recommended modifications of project.-Under date of April 20,
1932, the Chief of Engineers recommended modification of the exist-
ing project so as to provide for enlarging the inner basin by dredging
an additional area of about 10.5 acres to a minimum depth of 16
feet, and for deepening portions of the enlarged basin near the en-
trance to 20 and 18 feet, and for the construction of concrete walls
across the ledge at the southeast corner of the harbor, at an estimated
cost of $44,000, with $500 annually for maintenance in addition to
that now required, subject to certain conditions of local cooperation
 (Rivers and Harbors Committee Doc. No. 22, 72d Cong., 1st sess.).
   Terminal facilities.-There are three privately owned wharves.
   These facilities are considered adequate for existing commerce.
   Operations and results during fiscal year.-Maintenance dredging
was done in August and September 1933, in which time 57,218 cubic
yards were removed. The shore end of the east breakwater was rip-
rapled with 743 tons of stone. The costs were $15,734.89 for dredg-
ing and $4,222.61 for pier repairs, making a total of $19,957.50, all
for maintenance. The total expenditures during the year were
$19,963.74.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1901 at a saving of $3,018 under the estimated cost.
                    RIVERS AND HARBORS-DULUTH,                                                   MINN., DISTRICT                          995

   The dredging was completed in 1897. There is a controlling depth
of 16 feet at low-water datum in the harbor area under improve-
ment, as shown by a survey in September 1933.
   Under permit, private parties have dredged 420,795 cubic yards
since 1922 without cost to the United States. No dredging was done
during the fiscal year.
   The breakwaters are in excellent condition. The gravel spit along
the eastern side of the harbor is too low to prevent waves from roll-
ing into the harbor during severe storm periods.
   The cost of the existing project was $160,936.68 for new work and
$101,203.03 for maintenance, a total of $262,139.71. The total expen-
ditures were $262,139.71.
   Proposed operations.-The balance unexpended, June 30, 1934,
$14.86, will be applied to maintenance contingencies.
   The sum of $10,000 can be profitably expended for maintenance
during the fiscal year 1936 for placing, with hired labor, a dike
about 1,000 feet long near the lake side of the gravel spit on the
east side of the harbor.
                                          Cost and financial sumrnary

Cost of new work to June 30, 1934------------------------- $160, 936. 68
Cost of maintenance to June 30, 1934 ------------------------ 101, 203. 03

           Total cost of permanent work to June 30, 1934-----------                                                        262, 139. 71

Net total expenditures-----------------------------------262, 139. 71
Unexpended balance June 30, 1934------------------------------ 14. 86

           Total amount appropriated to June 30, 1934---------------262, 154. 57

           Fiscal year ending June 30                      1930                  1931               1932            1933             1934


                           ------------
Cost of new work------............                          -----------------                          ---.------------    ------------
Cost of maintenance-....--...........-----------------      $53. 65           $1, 231. 63         $4, 000. 00   $31, 765. 45      $19, 957. 50

Total expended-.-----------------              --------       53. 65            1, 231. 63         4, 000. 00    31, 759. 21        19, 963. 74
Allotted. -----------------------------                   3, 500. 00       -3, 768. 37             4, 000. 00    31, 765. 45        19, 972. 36


Balance unexpended July 1, 1933__-------------------------------                                                                          $6.24
Amount allotted from War Department Appropriation Act
  approved July 14, 1932__-------------------------- $10, 000. 00
Amount allotted from War Department Appropriation Act
  approved Mar. 4, 19331111_       -------------        10, 000. 00
                                                                                                                               20, 000. 00
     Amount to be accounted for_---------------------------                                                                    20, 006. 24
Deductions on account of revocation of allotment -----------------                                                                 -27. 64

       Net amount to be accounted for------------------------19,                                                                     978. 60
Gross amount expended_---------------------                   -- $20, 873.05
Less reimbursements collected_------------------------                 09. 31
                                                                                                                               19, 963. 74

           Balance unexpended June 30, 1934--------------------------                                                                     14. 86
Amount that can be profitably expended in fiscal year ending June
                                                                                                                -     -
    30, 1936, for maintenance 1-                  - ---           -
                                                                      --- -        -         -     -       -
                                                                                                                               10, 000. 00
   1Exclusive of available funds.
996    REPORT   OF CHIEF OF ENGINEERS,    U.   S.   ARMY,   1934

                  2. AGATE BAY HARBOR, MINN.

   Location.-The harbor is situated on the north shore of Lake
Superior, 27 miles northeast from Duluth, Minn. (See U. S. Lake
Survey Chart No. 9.)
   Existing projeot.-This provides for narrowing the natural en-
trance by the construction of rock-filled, timber-crib breakwaters,
1,050 and 900 feet long, from the eastern and western points of the
bay, respectively, and for dredging a small area to a depth of 18
feet, referred to low-water datum for Lake Superior, which is taken
at 601.6 feet above mean tide level at New York. The ordinary
variation of water level extends from 0 to +1 foot above low-water
datum. The estimate of cost for new work, made in 1887, was
$244,208. The latest (1928) approved estimate for annual cost of
maintenance is $10,000.
   The existing project was adopted by the River and Harbor Act of
August 5, 1886 (H. Ex. Doc. No. 94, 48th Cong., 2d sess.); the con-
struction of two breakwater piers was approved by the Secretary of
War January 4, 1887 (Annual Report for 1887, p. 1952). For latest
published map see Rivers and Harbors Committee Document No. 17,
Seventy-second Congress, first session.
   Supplementing the work authorized by Congress, the dredging to
26 feet deep of a maneuvering area on the north side of the harbor
and connecting the east breakwater with the shore, as recommended
by the Chief of Engineers in Rivers and Harbors Committee Docu-
ment No. 17, Seventy-second Congress, first session, has been in-
cluded in the Public Works program under the National Industrial
Recovery Act.
   Recommended modifications of project.-Included in Public Works
program.
   Local coo pertion.--The work included in the Public Works pro-
gram is subject to the condition that any lands needed will be pro-
vided free of cost to the United States.
   Terminal facilities.-There are no publicly owned wharves. The
3 ore docks, 1 coal dock, 1 pulpwood wharf, 1 merchandise wharf,
and 1 tug wharf are privately owned. The facilities are considered
adequate for the existing commerce.
   Operations and results during fiscal year.-The timber super-
structure on 700 linear feet of the west breakwater was replaced with
concrete during July to October 1933. The remaining 200 linear
feet is being repaired by Government plant and hired labor. Two
50-foot length cribs were removed and replaced and the timber
superstructure on the remaining 100 linear feet was removed in
preparation for concrete during May and June 1934. The total costs
were $55,878.93 for maintenance repairs to breakwaters and the
expenditures were $56,818.86.
   The following new work was done under an allotment from the
Federal Emergency Administration of Public Works: A rubble
mound extension 168 feet in length and containing 3,271 tons of
stone was placed during January to June 1934 by contract connect-
ing the inner end of the east breakwater with shore, and 74,775 cubic
yards of material were dredged from the maneuvering area. The
costs were $23,242.67 for dredging and $9,726.28 for breakwater
                   RIVERS AND HARBORS-DULUTH,                             MINN., DISTRICT                  997
construction, making a total of $32,968.95 , all for new work. The
total expenditures were $30,869.52.
   Condition at end of fiscall year.-The existing project was com-
pleted in 1901 at a saving of $10,150 under the estimated cost. The
breakwaters are in good condition, except for the portion now being
repaired.
   There was a controlling depth of 22 feet of water up to the ore
docks shown by a survey in June 1934. The depth at the entrance
is over 50 feet. The total costs were $234,057.53 for new work and
$210,188.52 for maintenance, a total of $444,246.05. The total ex-
penditures were $445,185.98.
   Work authorized by the Federal Emergency Administration of
Public Works is about 71 percent completed. To complete the work
there remains to finish the deepening and enlargement of the maneu-
vering area now in progress. The costs were $32,968.95 and the
expenditures $30,869.52, all for new work. The total cost of the
improvement, all funds, was $477,215, of which $267,026.48 Was for
new work and $210,188.52 for maintenance. The total expenditures
were $476,055.50.
   Proposed operations.-The balance unexpended June 30, 1934,
$14,420.76, will be applied to maintenance repairs to the west break-
water. The recapping in concrete of the middle 200 feet of the
west breakwater will be completed with hired labor during July
and August 1934.
   The balance, $17,830.48, of allotment from the National Industrial
Recovery Act will be applied to new work in completing, during
July to September 1934, contract dredging of the harbor to a depth
of 26 feet.
   No work is contemplated during the fiscal year 1936; therefore no
funds can be profitably expended.
                                    Cost and finanoiat summary
                                MAINTENANCE   AND IMPROVEMENT              FUNDS


Cost of new work to June 30, 1934______________________________ $234, 057..53
Cost of maintenance to June 30, 1934____________________________ 210, 188. 52

      Total cost of permanent work to June 30, 1934____________                                 444, 246. 05
Value of plant, materials, etc., on hand June 30, 1934_____________                               2, 750. 00
     Net total cost to June 30, 1934 _____ ________ -                               ___--446, 996. 05
Minus accounts payable June 30, 1934__________________                               ___    1, 810. 07
           Net total expenditures___________________                            _               445, 185. 98
Unexpended balance June 30, 1934________________________ ____                                       14, 420. 76

           Total amount appropriated to June 30, 1934_______________                            459, 606. 74

           Fiscal year ending June 30          1930           1931          1932        1933            1934

Cost ofnew work -- - - - -              --        -- --- -- _--
                                                -i_                -----------      -
Cost of maintenance --                  -      $912. 52 $1,038. 95             $48, 266. 11           $55, 878. 93
Total expended. __-        __                   912. 52      1, 038. 95               48, 266. 11      56, 818. 86
Allotted       _      __                      3, 750. 00   -1, 961. 05               112, 630. 91       6, 874. 82
998          REPORT        OF CHIEF OF                      ENGINEERS, U.           S. ARMY,           1934

Balance unexpended July 1, 1933______-__-         -  -_______-_____                                          $64, 364. 80
Amount allotted from War Department Appropria-
tion Act approved Apr. 26, 1934 ____________________ $10,
Amount allotted from War Department Appropria-
                                                                  00                           000.
  tion Act approved Mar. 4, 1933___        ______   ___   7, 000. 00
                                                                                                               17, 000. 00
      Amount to be accounted for_     _-----------------------                                                 81, 364.80
Deductions on account of revocation of allotment               _____________                                   10, 125. 18
      Net amount to be accounted for     -----------------                                                     71, 239. 62
Gross amount expended__________________________ $58, 085.93
Less reimbursements collected_____________________     1, 267. 07
                                                                                                               56, 818. 86
      Balance unexpended June 30, 1934__                                                          ___          14, 420. 76
Outstanding liabilities June 30, 1934------------                                                               5, 133. 64
          Balance available June 30, 1934________________________                                               9, 287. 12

                                               PUBLIC        WORKS FUNDS

Cost of new work to June 30, 1934___________________________ $32, 968. 95
Cost of maintenance to June 30, 1934____   ________________-                                                 ----------
      Total cost of permanent work to June 30, 1934----_______                                                 32, 968. 95
Minus accounts payable June 30, 1934______________-______                                                       2,099. 43

      Net total expenditures-----------                                 --------------------                   30, 869. 52
Unexpended balance June 30, 1934 ____                                 ___-----------___                  _     17, 830. 48
          Total amount appropriated to June 30, 1934_ ...__-                                     __          -_48, 700. 00

          Fiscal year ending June 30.                       1930       1931             1932          1933         1934


Cost of new work   ..---------------..........             ------------------           ----------------         $32, 968. 95
Cost ofmaintenance .--                                  ----------
Total expended-----------                   -------------------------------------------------                     30, 869. 52

Allotted-------------            ------------------------                     -------            --------         73, 700. 00



Amount allotted from National Industrial Recovery Act approved
  June 16, 1933-----------      ----------------------------                                                  $73, 700. 00
Deductions on account of revocation of allotment_-------------                                                 25, 000. 00

       Net amount to be accounted for__                             _______                                    48, 700. 00
Gross amount expended --------                                         ________ $30, 874.23
Less reimbursements collected --------                               __________        4. 71
                                                                                                               30, 869. 52

      Balance unexpended June 30, 1934   _________                                                             17, 830. 48
Outstanding liabilities June 30, 1934-------------- $2, 099. 43
Amount covered by uncompleted contracts_________ 15, 731. 05
                                                                                                               17, 830. 48
                     RIVER'S AND HARBORS-DULUTH,                                        MINN., DISTRICT                      999
   CONSOLIDATED COST AND FINANCIAL SUMMARY FOR AGATE BAY HARBOR,                                                       MINN.


Cost of new work to June 30, 1934____       _____-------__      $267, 026. 48
Cost of maintenance to June 30, 1934. .------------------------  210, 188. 52

      Total cost of permanent work to June 30, 1934 ---- ____----   477, 215.00
Value of plant, materials, etc., on hand June 30, 1934 ------------   2, 750. 00

     Net total cost to June 30, 1934-___ --     _-------_                                          -       -      479, 965. 00
Minus accounts payable June 30, 1934_---_____-----------..                                                          3, 909. 50

     Net total expenditures ----- ____----------  --------- 476, 055. 50
Unexpended balance June 30, 1934---------------------------- 32, 251.24

           Total amount appropriated to June 30, 1934 ----------                                        __.       508, 306. 74

           Fiscal year ending June 30                       1930            1931            1932          1933            1934

Cost of new work      -------------------------------------------------------                                           $32, 968. 95
Cost of maintenance----....---------------- $912. 52 $1, 038. 95 -..----------... $48, 266. 11                           55, 878. 93
       Total cost------------------------                    912. 52       1, 038. 95   ------------    48, 266. 11      88, 847. 88

Total expended--------------------------                     912. 52      1, 038.95------------48,         266. 11       80, 574. 82

Allotted...................-----------------------------   3, 750. 00    -1, 961. 05    -----------    112, 630. 91      90, 700. 00



Balance unexpended July 1, 1933- -----------   __------_--__    ____ $64, 364.                                                   80
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934__------------                 $10, 000.00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933-___-_-----_
                                     --------
Amount allotted from National Industrial Recovery
                                                            7,                                         000.00.
Act approved June 16, 1933- ------------------       -- 73, 700. 00
                                                                      90, 700. 00
      Amount to be accounted for __----------____-                                                                 155, 064. 80
                                                                                                                 -______
Deductions on account of revocation of allotment-----                                                   ____        35, 125. 18
      Net amount to be accounted for -      -
                                         ____-  -    -       __ 119, 939. 62
Gross amount expended -------            _____----__ $88, 960. 16
Less reimbursements collected ---__    -      -    -   1, 271. 78
                                                                  87, 688. 38
      Balance unexpended June 30, 1934----------------                                                                32, 251. 24
Outstanding liabilities June 30, 1934       ___ -____ $7, 233. 07
Amount covered by uncompleted contracts-                  731. 05
                                                      1----___
                                                      15,
                                                                                                                      22, 964. 12

          Balance available June 30, 1934--                             ------------- ___ --             __           9, 287. 12

                  3. DULUTH-SUPERIOR                          HARBOR, MINN. AND WIS.

   Location.-This harbor is at the extreme western end of Lake
Superior. The cities of Duluth, Minn., and Superior, Wis., are
situated on the north and south sides, respectively. (See U. S. Lake
Survey Chart No. 966.)
   Previous projects.-Superior and Duluth were separate improve-
ments until consolidated by the River and Harbor Act of June 3,
1896. The original project for the harbor at Superior City was
adopted by River and Harbor Act of March 2, 1867; for Duluth Har-
bor by River and Harbor Act of March 3, 1871. These projects were
1000   REPORT OF CHIEF OF ENGINEERS,        U.   S.   ARMY,   1934

modified by River and Harbor Acts of March 3, 1873; March 3, 1881,
July 5, 1884, August 5, 1886, August 11, 1888, and July 13, 1892.
The total cost and expenditures were $1,547,195, which cannot be
divided as to new work and maintenance. For further details see
page 1929 of Annual Report for 1915.
   Existing project.-This provides for rebuilding the canal piers at
Dul'uth entry with stone-filled timber-crib substructure and concrete
superstructure, 1,734 feet long and 300 feet apart for 1,250 feet, then
flaring to 540 feet apart at the harbor end; for replacing the north
and south piers at Superior entry with concrete piers, 2,096 and 1,584
feet long, respectively, 500 feet apart for 808 feet, then flaring at the
harbor end; for constructing 4,205 feet of rubble-mound breakwaters.
900 feet of concrete pierheads on stone-filled cribs, and 896 feet of
concrete shore revetments at Superior entry, the lake ends being 600
feet apart on the 30-foot contour in prolongation of the entrance
channel and diverging to 2,100 feet apart at the shore line, for dredg-
ing a lake approach to Duluth entry 300 feet wide to a depth of 30
feet and a channel 300 feet wide between the piers to a depth of 24
feet; for dredging a channel 500 feet wide between the piers at
Superior entry to a depth of 24 feet, a central channel 600 feet wide
between the breakwaters and pierheads to a depth of 30 feet, and
a stilling basin of 35 acres inside the breakwaters to a depth of 24
feet; for dredging a harbor basin of 380 acres to a depth of 22 feet
inside Duluth entry and a harbor basin of about 296 acres to a depth
of 20 feet inside Superior entry; and for dredging channels, includ-
ing a channel in Howards Bay, varying from 100 to 600 feet in width
throughout the harbor and aggregating 18 miles in length to a depth
of 20 feet.
   The project depths are referred to low-water datum for Lake
Superior, which is taken at 601.6 feet above mean tide level at New
York. Highest single gage reading, November 28, 1905, was 3.7
feet above low-water datum; lowest single gage reading, January
23, 1926, was 1.95 feet below low-water datum; the annual fluctuation
is about 1 foot.
   The estimate of cost for new work, revised in 1930, was $5,936,000,
exclusive of amounts expended on previous projects. The latest
 (1930) approved estimate for annual cost of maintenance is $52,000.
   The existing project was authorized by the following river and
harbor acts: The act of June 3, 1896, provided for dredging alone
 (H. Ex. Doc.No. 59, 53d Cong., 3d sess.); the act of June 13, 1902,
provided for rebuilding' the piers at Superior entry; the act of
March 2, 1907, provided for the enlargement of the plant, for Supe-
rior entry and for additional dredging near the draw span of the
Northern Pacific Railroad bridge (H. Doc. No. 82, 59th Cong., 2d
sess.) ;section 4 of the Administrative Act of May 28, 1908, provided
for dredging an additional area for the basin inside the Duluth
entrance to a depth of 22 feet (H. Doc. No. 221, 60th Cong., 1st
sess.); the act of July 27, 1916, provided for continuing improve-
ments by enlarging the Superior Harbor Basin (H. Doe. No. 651,
64th Cong., 1st sess.) ; the act of March 2, 1919, provided for remov-
ing the shoal point in the southerly end of the East Gate Basin
 (H. Doc.No. 1018, 64th Cong., 1st sess,) ; and the acts of January 21.,
           RIVERS AND HARBORS-DULUTH,        MINN., DISTRICT      1001
1927 (H. Doc. No. 245, 69th Cong., 1st sess.), and July 3, 1930
  (Rivers and Harbors Committee Doc. No. 32, 71st Cong., 2d sess.),
provided for the channel in Howards Bay. For latest published map
see Rivers and Harbors Committee Document No. 32, Seventy-first
Congress, second session, and House Document No. 482, Seventy-
second Congress, second session.
    Supplementing the work authorized by Congress, the following
modification of the project for improvement of Duluth-Superior
Harbor, Minn. and Wis., as recommended by the Chief of Engineers
in House Document No. 482, Seventy-second Congress, second ses-
sion, has been included in the Public Works program under the
National Industrial Recovery Act:
   A flared lake approach to Duluth entry 32 feet deep, and a channel
between the piers 32 feet deep at the pierheads, gradually decreasing
to 26 feet at the harbor basin.
   A flared lake approach to Superior entry 32 feet deep, a channel be-
tween the breakwater entrance and the pierheads, with a width vary-
ing from a minimum of 600 feet to a maximum of 1,100 feet, 32 feet
deep at the breakwater entrance, gradually decreasing to 28 feet
at the pierheads, and a channel between the piers, 28 feet at the
pierheads, gradually decreasing to 25 feet at the harbor basin.
   A depth of 26 feet in the northern part of the harbor basin inside
Duluth entry consisting of 201 acres; a depth of 25 feet in the south-
ern portion of the harbor basin and part of the East Gate Basin; and
a depth of 22 feet in the remainder of East Gate Basin.
   A harbor basin of 290 acres 25 feet deep inside Superior entry; and
Superior Front Channel through Superior Bay, 13,200 feet long, 600
feet wide, and 22 feet deep.
   A depth of 25 feet in the south channel of St. Louis Bay from the
entrance to the cross channel, inclusive, with widths varying from
500 to 900 feet; a cross channel of the same depth with minimum
width of 1,150 feet, and a depth of 25 feet in the north channel of
St. Louis Bay opposite the cross channel; elsewhere in the north
channel and the south channels and the St. Louis River to a point
9,600 feet above the Grassy Point Bridge, a depth of 21 feet and a
minimum width of 400 feet, except at Arrowhead Bridge.
   A channel in Allouez Bay, 2,100 feet long, 400 feet wide, and 22
feet deep, a channel in Howards Bay 6,000 feet long, narrowing in
width from 300 feet to 125 feet, and 21 feet deep.
   Recommended modifications of project.-Included in Public Works
program, except a small amount of riprap work at Superior entry.
   Terminal facilities.-Except that the facilities for handling pack-
age freight, lumber, and general merchandise are susceptible of im-
provement, the terminal facilities, consisting of wharves, ore docks,
and grain elevators, are believed to be adequate for existing com-
merce, and are being increased as necessity demands.
   Operations and results during fiscal year.-The following main-
tenance work was done by United States plant: 23,196 cubic yards
of material were dredged in removing shoals and 4,777 tons of stone
were placed in repairing the Superior entry breakwaters and shore
wings.
   The cost of the various items of work done during the year with
regular funds were as follows: $8,574.88 for dredging, $18,709.03 for
1002   REPORT   OF CHIEF   OF   ENGINEERS, U.   S.   ARMY,   1934


breakwater repairs, $1,954.08 for inspections, surveys, and harbor
patrol. The total costs were $29,237.99, all for maintenance. The
total expenditures were $9,875.68.
   Under the Public Works program a total of 1,773,984 cubic yards
of material were dredged in the deepening and widening of chan-
nels and basins. Of this amount, 1,616,313 cubic yards were re-
moved by contract and 157,671 cubic yards by United States plant.
The total cost was $281,404.92 and the expenditure $245,069.96.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1931 at a saving of $167,983 under the estimated cost. The
following work has been accomplished: 17 miles of channels with a
width of from 100 to 600 feet and a depth of 20 feet, completed in
1902; new piers, aggregating 3,468 feet in length, of concrete on
stone-filled cribs founded on piles, completed in 1901 at Duluth
Canal; concrete park and sea walls and an engineer office building
completed at Duluth Canal in 1906; a vessel yard near Duluth
Canal, completed in 1904, was further enlarged and improved in
1924, 1927, and 1931; Duluth Harbor Basin, with an area of 446
acres, with 22 feet of depth, completed in 1915; the approach to
Duluth entrance dredged to 30 feet and canal to 24 feet, completed
in 1907; the canal at Superior entry widened to 500 feet, and all con-
crete piers, aggregating 3,680 feet in length, completed in 1909; lake
approach to canal entrance deepened to 30 feet and canal to 24 feet,
completed in 1909; converging breakwaters comprising 4,205 linear
feet of rubble mound, 900 linear feet of stone-filled cribs and con-
crete superstructure pierheads founded on piles, and 896 linear feet
of concrete shore revetments on pile foundations, completed in 1912;
enlargement of East Gate Basin completed in 1920, with a present
total area of basin 213 acres and depth of 20 feet; Superior entry
stilling basin, with an area of 35 acres and depth of 24 feet, com-
pleted in 1915; Superior Harbor Basin with an area of 296 acres
and a depth of 20 feet, dredged in 1920 and 1931; the channel in
Howards Bay, 11/8 miles in length, was deepened to 20 feet in 1928
and 1931. All piers and revetments are riprapped.
   The controlling depth in this harbor and up the St. Louis River
to a point opposite the northerly end of Big Island is 20 feet at low-
water datum, as shown by surveys completed in May 1934. There
is some shoaling along the sides of channel and basins, and large
shoal areas occur in Duluth Harbor Basin as accumulation of several
years. The head of navigation for excursion steamers, small craft,
rafts, and logging is at Fond du Lac, on the St. Louis River.
   The entrance piers and breakwaters, the buildings and docks, at
the vessel yard, and the engineer office building are all in good
condition.
   The riprap along the channel faces of the piers at the Duluth Canal
and Superior entry has settled. The north breakwater has been
reconnected to shore by a shore wing, but the beach is cutting away
at the end of this wing.
   The costs of the existing project were $5,768,016.69 for new work
and $1,694,810.45 for maintenance, a total of $7,462,827.14. The
total expenditures were $7,934,532.99.
                 RIVERS AND HARBORS          DULUTH, MINN., DISTRICT              1003
   Work authorized by the Federal Emergency Administration of
Public Works is about 95 percent completed. To complete the work
there remains to finish the deepening and widening of channels and
basins under contracts now in progress and to riprap the piers at
Superior entry to protect them from being undermined from scour
as a result of the deepening of the entrance channel. The costs were
$281,404.92 and the expenditures $245,069.96, all for new work. The
total cost of the improvement, all funds, was $7,744,232.06, of which
$6,049,421.61 was for new work and $1,694,810.45 for maintenance
The total expenditures were $8,179,602.95.
  Proposed operations.-The balance unexpended June 30, 1934,
including accounts receivable at end of the fiscal year, will be applied
to maintenance as follows:
Accounts     payable June 30, 1934___                                        $12, 052. 06
Dredging with U. S. dipper dredge Gaillard during October and
  November 1934 and April 1935_______________________________      27,            509. 95
Breakwaters:
    Main portions, repairs with U. S. derrick boat Coleman during
      September and October 1934------------------------------     10,            000. 00
    Shore wings and groins, repairs with U. S. derrick boat Cole-
      man during November 1934 and April 1935------------------10,                000. 00
Replacement of 2 small motor-propelled passenger-carrying vehicles  1,            500.00

      Total for maintenance---                _               -------         61, 122. 01

   The balance, $850,930.04, of allotment from the National Industrial
Recovery Act, plus accounts receivable at end of the fiscal year, will
be applied to new work in completing the deepening of channels and
basins, under existing contracts, between July 1934 and November
1935.
   New work consisting of placing riprap along base of piers at
Superior entry will be required to prevent undercutting caused by
deepening of project authorized by Federal Emergency Administra-
tion of Public Works. Annual maintenance dredging for the re-
moval of shoals and maintenance repairs to breakwaters and piers
will be necessary. Building alterations and repairs will be required
at United States vessel yard. Routine operations will be carried on.
The additional sum of $135,000 can be profitably expended during
the fiscal year 1936 as follows:
New work: Piers, Superior entry, riprap along base by contract during
  summer of 1935 _-       ---                       ---  -                       $43, 000

Maintenance:
    Dredging with U. S. dipper dredge Gaillard during the fall of
      1935 and spring of 1936 -------------------                        -----    60, 000
    Breakwaters-repairs to main portions and wings with U. S.
      derrick boat Coleman during the fall of 1935------------------.6, 500
    Piers-repairs and riprap with hired labor during the spring of
      1936                              -                 ----------             11, 500
    Vessel-yard       buildings, alterations and repairs with hired labor
      during the summer of 1935_-                                 ---              4, 000

           Total---               ___                 ---               --        92, 000

           Total for maintenance and improvement      -                          135, 000
1004         REPORT          OF CHIEF OF               ENGINEERS,                 U.TS. ARMY,            1934

                                       Cost and financial sumnmary
                                 MAINTENANCE           A   D IMPROVEMENT               FUNDS


Cost of new work to June 30, 1934_                                         --__                          $7,315, 211.69
Cost of maintenance to June 30, 1934 _____                                   ___--                        1, 694, 810. 45

      Total cost of permanent work to June 30, 1934__________                                             9, 010, 022. 14
Value of plant, materials, etc., on hand June 30, 1934__________                                             476, 187. 70
      Net total cost to June 30, 1934________________________ _                                           9, 486, 209. 84
Plus accounts receivable June 30, 1934________________________                                                 6, 305. 16

      Gross total costs to June 30, 1934____________________                                              9, 492, 515. 00
Minus accounts payable June 30, 1934______________________                                                    10, 787.01

     Net total expenditures__________________--______                                                     9, 481, 727. 99
Unexpended balance June 30, 1934__-- ___________-___------ -                                        _         54, 816. 85

         Total amount appropriated to June 30, 1934_____________                                          9, 536, 544. 84

    Fiscal year ending June 30            1930                1931                  1932          1933                  1934


C ost of new w ork__________       _        -
                                        _____-             $124,886.62        $29, 256. 36      $1, 434. 33     ....-         ..--.
                                                                                                                                  ..
Cost of maintenance                    $111, 461. 58        227, 211. 50      103, 626. 78      78, 888. 28             $29, 237. 99

       Total cost_                      111, 461. 58        352, 098. 12      132, 883. 14      80, 322. 61             29, 237. 99

Total expended-              _           89, 035. 92        213, 387. 67      158, 871. 26      77, 730. 25              9, 875. 68
Allotted_ ___________-----       ---    163, 600. 00        285, 250. 00     -53,     009. 33   115, 346. 66            22, 001.34



Balance unexpended July 1, 1933_______________                                                                 $42, 691.19
Amount allotted from War Department Appropria-
  tion Act approved Apr. 26, 1934                   $36, 000. 00
Amount allotted from War Department Appropria-
  tion Act approved July 14, 1932_ _______ __-___- 12, 567. 80
Amount allotted from War Department Appropria-
  tion Act approved Mar. 4, 1933___ ____- ____-----33, 000. 00
                                                                                                                81, 567. 80

      Amount to be accounted for___       ________-------------124, 258. 99
Deductions on account of revocation of allotment_____-____-_     59, 566. 46

         Net amount to be accounted for_________________-_____                                                  64, 692. 53
Gross amount expended                                                                       238. 13
                                                                                      $_____________249,
Less :
    Reimbursements collected- ___--- -                        $238, 871. 80
    Receipts from sales ______--__                                  490. 65
                                                                                        239, 362. 45
                                                                                                                 9, 875.68

      Balance unexpended June 30, 1934______________________                                                    54,816.85
Outstanding liabilities June 30, 1934                                                                           12, 052. 06

      Balance available June 30, 1934________________ __ -__                                                    42, 764. 79
Accounts receivable June 30, 1934________________6-------------,                                                    305. 16

         Unobligated balance available June 30, 1934_____________                                              49, 069. 95

Acunt that can be profitably expended in fiscal year ending
June 30, 1936, for maintenance 1__________---------------                                                      92, 000. 00

   1 Exclusive of available funds.
                       RIVERS AND HARBORS-DULUTH,                                                 MINN., DISTRICT                  1005
                                                         PUBLIC WORKS               FUNDS

Cost of new work to June 30, 1934___________________________                                                              $281, 404.92
Cost of maintenance to June 30, 1934__

      Total cost of permanent work to June 30, 1934_ ......                                                       __        281, 404. 92
Plus accounts receivable June 30, 1934_ -______-______                                                            __             190. 80
     Gross total costs to June 30, 1934_______________________                                                             281, 595. 72
Minus accounts payable June 30, 1934___ _____________________                                                               36, 525. 76
     Net total expenditures----           -------                                                                          245, 069. 96
Unexpended balance June 30, 1934____________________________                                                               850, 930. 04
         Total amount appropriated to June 30, 1934_____ ________                                                        1, 096, 000. 00

   Fiscal year ending June 30                            1930                1931                 1932           1933            1934


Cost of new work____________________________$281,                                                                                    404. 92
C ost of maintenance ...           . . .... - -..---
                                 ..-                                ---    ----- -------                          . . . . . . . .
                                                                                                           . . . --..
                                                                                       --------------- --------
Total expended ----------                            -          ---                                                             245, 069. 96

A llotted ----   ---   --- ---   ---   ---   ............       -     .-                  -   -    - -   - ,---...
                                                                                                            - -   --          1, 096, 000. 00


Amount allotted from National Industrial Recovery Act approved
  June 16, 1933---------------------------------               $1, 276, 000. 00
Deductions on account of revocation of allotment _____________     180, 000. 00
      Net amount to' be accounted for---___------------                                                                  1, 096, 000. 00
Gross amount expended__________________________ $245, 835. 02
Less reimbursements collected _________                 765. 06
                                                                                                                           245, 069. 96

      Balance unexpended June 30, 1934 ____..____ ________                                                                 850, 930. 04
Outstanding liabilities June 30, 1934          __ $36, 525. 76
Amount covered by uncompleted contracts ---------- 812, 933. 22
                                                                                                                           849, 458. 98

      Balance available June 30, 1934                                                                                         1, 471. 06
Accounts receivable June 30, 1934 __ _____-____                                                    _____          _- -           190. 80

         Unobligated balance available June 30, 1934_...____..                                                                1, 661. 86

Amount (estimated) required to be appropriated for completion
of Public Works Administration project 1 -                                                                                  43, 000. 00

Amount that can be profitably expended in fiscal year ending
  June 30, 1936, for new work 1                                       -             ___                                      43, 000. 00

   CONSOLIDATED COST AND FINANCIAL SUMMARY FOR DULUTII-SUPERIOR                                                              HARBOR,
                              MINN. AND WIS.

Cost of new work to June 30, 1934__________________________                                                             $7, 596, 616.   61
Cost of maintenance to June 30, 1934________________________                                                             1, 694, 810.   45
      Total cost of permanent work to June 30, 1934         __                                    ---------              9, 291, 427.   06
Value of plant, materials, etc., on hand June 30, 1934___---__                                                              476, 187.   70
      Net total cost to June 30, 1934____        _____      ___   9, 767, 614. 76
Plus accounts receivable June 30, 1934                                 6__________________
                                                                       6, 495. 96
      Gross total costs to June 30, 1934______________________    9, 774, 110. 72
Minus accounts payable June 30, 1934_________________________         47, 312. 77
     Net total expenditures__ _________________________9, 726, 797. 95
Unexpended balance June 30, 1934------------___          -           905, 746. 89
     Total amount appropriated to June 30, 1934-      _-_   __10,    632, 544. 84
  ' Exclusive of available funds.
1006         REPORT               OF CHIEF OF ENGINEERS, U.                                   S.     ARMY,         19 3 4


    Fiscal year ending June 30                             1930            1931            1932             1933               1934


Cost of new work ._______                       .
                                           _______----_                 $124, 886. 62   $29, 256. 36      $1, 434. 33        $281, 404. 92
Cost of maintenance---
                    .-.---                     .      $111, 461. 58      227, 211. 50   103, 626. 78      78, 888. 28          29, 237. 99

       Total cost----------------                       111, 461.58      352, 098.12    132, 883.14       80, 322. 61         310, 642. 91
Total expended------------------                          89, 035. 92    213, 387. 67   158, 871. 26      77, 730. 25         254, 945. 64

Allotted .......   ----------------                     163, 600. 00    285, 250. 00    -53, 009. 33      115, 346. 66      1, 118, 001. 34


Balance unexpended July 1, 1933___                _                                               _____   _______ $42, 691. 19
Amount allotted from War Department Appropria-
  tion Act approved Apr. 26, 1934--- _________-                                                   $36, 000. 00
Amount allotted from War Department Appropria-
  tion Act approved July 14, 1932 _____________                                                    12, 567. 80
Amount allotted from War Department Appropria-
  tion Act approved Mar. 4, 1933___---    - ____-                                                  33, 000. 00
Amount allotted from National Industrial Recovery
  Act approved June 16, 1933-----------------       1,                                         276, 000. 00
                                                                                                                    1, 357, 567. 80

     Amount to be accounted for                                                                                        400, 258. 99
                                                                                                                    1-------------------------,
Deductions on account of revocation of allotment--------------                                                         239, 566. 46

      Net amount to be accounted for                                                                                   160, 692. 53
                                                                                                                    1----------------------,
Gross amount expended----------                                                               $495, 073. 15
Less-
    Reimbursements collected ------- $239, 636. 86
    Receipts from sales-------------       490. 65
                                                                                                  240, 127. 51
                                                                                                                         254, 945. 64

      Balance unexpended June 30, 1934----------------------                                                             905, 746. 89
Outstanding liabilities June 30, 1934 ------------ $48, 577. 82
Amount covered by uncompleted contracts-------- 812, 933. 22
                                                                                                                         861, 511. 04
      Balance available June 30, 1934------------------------                                                            44, 235. 85
Accounts receivable June 30, 1934 ---------------------------                                                             6, 495. 96
          Unobligated balance available June 30, 1934--------------                                                       50, 731. 81

Amount (estimated) required to be appropriated for completion
of Public Works Administration project 1     ---------                                                                  43, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1936:
   For new work 1--------------------------------------                                                                   43, 000. 00
      For maintenance 1----------------                                                                                   92, 000. 00

          Total    1--------------------------------------------                                                         135, 000. 00
                                               4. ASHLAND HARBOR, WIS.

  Location.-The harbor is situated at the head of Chequamegon
Bay, on the south shore of Lake Superior. (See U. S. Lake Survey
Charts Nos. 961 and 964.)
  Existing project.-This provides for an 8,000-foot breakwater and
a dredged channel 20 feet deep along the dock front, 75 feet outside
the harbor line, 200 feet wide from a point 400 feet west of Seven-
teenth Avenue West produced to Eighth Avenue West produced,
400 feet wide from Eighth Avenue West produced to Ellis Avenue
   1 Exclusive of available funds.
           RIVERS AND HARBORS-DULUTH,         MINN., DISTRICT     1007
produced; for an entrance channel 400 feet wide extending in a
northerly direction from the easterly end of this channel; and a
basin 22 feet deep and about 4,800 feet long, extending from a point
about 400 feet west of the Soo Dock to a point 1,000 feet east of the
Chicago & North Western Dock No. 3, and extending from a line
75 feet outside of the harbor line to deep water in the bay.
   The project depths are referred to low-water datum for Lake.
Superior, which is taken at 601.6 feet above mean tide level at New
York. The ordinary variation of water level extends from 0 to +-1
foot above low-water datum.
   The estimate of cost for new work, revised in 1930, was $493,400.
The latest (1930) approved estimate for annual cost of maintenance
is $12,000.
   The existing project was authorized by the following river and
harbor acts: The act of August 5, 1886, provided for a breakwater
7,900 feet long and dredging to remove shoal (H. Ex. Doc. No. 89,.
48th Cong., 2d sess., and Annual Report for 1886, p. 1674, and 1887.
p. 1966), the act of August 11, 1888, appropriated $60,000 for " con-
tinuing improvement on the enlarged project." On the completion
of the Poe Lock in 1896, with an available depth of 20 feet, the
dredging at Ashland Harbor was carried to a similar depth; the
act of March 3, 1899, provided for the extension of the breakwater
to the shore, but the act of June 6, 1900, directed that in lieu of this
extension there should be substituted a detached breakwater extend-
ing 4,700 feet out from the shore at a point 2,600 feet east of the
main breakwater (prolonged) and parallel thereto; the act of August
8, 1917, provided for the completion of this improvement, omitting
the detached breakwater, and defining the depth and extent of chan-
nel to be dredged (H. Doc. No. 1698, 64th Cong., 2d sess.); and the
act of July 3, 1930, provided for the widening of part of this channel,.
for an entrance channel, and for the basin in the eastern part of the
harbor (S. Doc. No. 133, 71st Cong., 2d sess.). The latest published
map is in the last-mentioned document.
   Supplementing the work authorized by Congress, the deepening
of the east basin to 25 feet and the west channel as far as Eighth
Avenue West extended, to 21 feet, as recommended by the Chief of
Engineers in Rivers and Harbors Committee Document No. 40,
Seventy-second Congress, first session, has been included in the
public-works program under the National Industrial Recovery Act.
   Recommended modifications of project.-Included in public-works
program.
   Terminal facilities.-The city of Ashland owns 4,150 feet of water
front, exclusive of street ends, for future public needs, and has one
wharf, which is now in ruins.
   The wharves and ore docks, with the exception of those for han-
dling lumber, are served by railroads. The facilities are considered
adequate for the existing commerce.
   Operations and results during fiscal year.-No work was done or
funds expended on the existing project.
   Preliminary work and prior to dredging soundings were taken
for deepening the east basin under an allotment approved by the
Federal Emergency Administration of Public Works. The total
costs were $3,901.66 and the expenditures $3,819.24, all for new work.
     91536-EN   1934-64
1008          REPORT   OF       CHIEF     OF ENGINEERS,              U.   S.    ARMY,        1934

    Condition at end of fiscal year.-The existing project was com.
pleted in 1931. The breakwater is in good condition, except for
some settlement causing low places which should be brought up to
the prescribed elevations.
   In March 1934 there was a controlling depth of 20 feet in the west
channel and 22 feet in the basin. Some shoaling has occurred.
   The costs of the existing project were $510,480.80 for new work
and $432,104.97 for maintenance, a total of $942,585.77. The total
expenditures were $944,271.85, all regular funds.
   Actual dredging work has not been started on the contract for
the improvement authorized by the Federal Emergency Adminis-
tration of Public Works. The total costs were $3,901.66 and the
expenditures $3,819.24, all for new work.
   The total cost of the improvement, all funds, was $946,487.43, of
which $514,382.46 was for new work and $432,104.97 for mainte-
nance. The total expenditures were $948,091.09.
    Proposed operations.-The balance unexpended June 30, 1934,
 $14,000, will be applied mainly to the removal of shoals in the
channel in the western portion of the harbor with U. S. dipper
dredge Gaillardduring June 1935.
    The balance, $204,180.76, of allotment from the National Indus-
trial Recovery Act will be applied to new work in completing the
deepening of east basin to a depth of 25 feet under existing contract
between July 1934 and July 1935.
    Maintenance dredging and minor repairs to the breakwater will
be necessary. The additional sum of $27,000 can be profitably
expended during the fiscal year 1936, as follows:
Maintenance :
   Dredging with U. S. dipper dredge Gaillard, spring of 1936___                                   $15, 000. 00
   Breakwater ,repairs by hired labor, fall of 1935_______________                                  12, 000. 00

        Total                                                                                       27, 000. 00
                                  Cost and financial sumimary
                          MAINTENANCE           AND IMPROVEMENT           FUNDS

Cost of new work to June 30, 1934_-       ----------            $510, 480. 80
Cost of maintenance to June 30, 1934___________________________ 432, 104. 97

      Total cost of permanent work to June 30, 1934________                                  _     942, 585. 77
Value of plant, materials, etc., on hand June 30, 1934                                                , 686. 08
                                                                                                     1------------
        Net total cost to June 30, 1934_-______________________                                    944, 271. 85
Net total expenditures----------------------------------------                                     944, 271. 85
Unexpended balance June 30, 1934______________________________                                      14, 000. 00
         Total amount appronriated to June 30, 1934_______________                                 958, 271. 85

   Fiscal year ending June 30           1930            1931           1932           1933               1934


Cost of new work______________                       $154, 844. 13   $92, 209. 70
Cost of maintenance                      $541. 86       3, 500. 00    14, 446. 17   $28, 427. 15
      Total cost____                      541. 86     158, 344. 13   106, 655. 87    28, 427. 15______________
Total expended------     ---              541. 86     107, 464. 17   157, 535. 83    30, 113. 23
Allotted- -    ---     -------          3, 500. 00    230, 000. 00   -8, 500. 00     36, 475. 21         $7, 638. 02
                RIVERS AND HARBORS-DULUTH, MINN., DISTRICT                                                  1009
'Balance    unexpended July 1, 1933 _----------_                                          _           $6, 361.998
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934______________---------- $14, 000. 00
Amount allotted from War Department Appropriation
   Act approved Mar. 4, 1933             .----                                      5, 000. 00
                                                                                                       19, 000. 00
Amount to be accounted for________________                                                            25, 361. 98
.Deductions on account of revocation of allotment_________-__-                                      _ 11, 361. 98

         Net amount to be accounted for__________-------------_                                        14,000.00

         Balance unexpended June 30, 1934 _______________________-14, 000. 00

Amount that can be profitably expended in fiscal year ending June
  30, 1936, for maintenance 1_______------------------------------ ----- 27, 0000. 00
                                      PUBLIC WORKS FUNDS

                                             --
-Cost of new work to June 30, 1934 __ _________----_--                                                $3, 901. 66
Cost of maintenance to June 30, 1934____________       __                          __         ___

      Total cost of permanent work to June 30, 1934 ..
                                                     __.         __ _                                   3, 901. 66
Minus accounts payable June 30, 1934       ___________----------------                                      82. 42

      Net total expenditures__ ___- ________-________        --                                        3, 819. 24
Unexpended balance June 30, 1934_______________________________                                      204, 180. 76
         Total amount appropriated to June 30, 1934____                                              208, 000. 00

    Fiscal year .ending June 30       1930          1931                 1932             1933             1934


-Cost ofnew work           -....................
                                            -        -     -- -              - -   ----                   $3, 901. 66
Cost ofmaintenance___--
'Totalexpended----- ---------     -------------.                                                            3,819. 24
                    ---------------
Allotted-.....-..........          -----------
                        --------------                            --------------                          208, 000. 00


Amount allotted from National Industrial Recovery Act approved
  June 16, 1933 ____________-_____________-____--$208,                                                     000. 00
;Gross amount expended___________________________                                                       3, 819'. 24

      Balance unexpended June 30, 1934 __..__- __- -_____--                                           204, 180. 76
Outstanding liabilities June 30, 1934_________________      $82. 42
Amount covered by uncompleted contracts-------         200, 922. 73
                                                                                                      201, 005. 15
         Balance available June 30, 1934________________-_-                                ___          3,175. 61
      CONSOLIDATED COST AND FINANCIAL              SUMMARY FOR               ASHLAND       HARBOR,       WIS.

Cost of new work to June 30, 1934________________    _________                                     $514, 382. 46
Cost of maintenance to June 30, 1934__________________________                                      432, 104. 97
       Total cost of permanent work to June 30, 1934-----------                                       946, 487. 43
Value of plant, materials, etc., on hand June 30, 1934                      -------------              1, 686. 08
       Net total cost to June 30, 1934___________________________                                     948, 173. 51
lMinus accounts payable June 30, 1934--------------------------                                            82. 42
       Net total expenditures -------------------                                                     948, 091. 09
UJnexpended balance June 30, 1934     __________________________                                     218,180.'76
         Total amount appropriated to June 30, 1934----___                                          1, 166, 271. 85

   'Exclusive cof available funds.
1010        REPORT OF            CHIEF        OF ENGINEERS,              U.    S. ARMY,               1934


   Fiscal year ending June 30            1930               1931           1932                1933               1934


Cost of new work .__ __________.
Cost of maintenance
                              ..         _         -
                                             $541. 86
                                                        $154, 844. 13    $92, 209. 70   C.       ..--        -   $3, 901. 66
                                                            3, 500. 00    14, 446. 17        $28, 427. 15     _________
      Total cost.       _                     541. 86    158, 344. 13    106, 655. 87         28, 427. 15          3, 901. 66
Total expended_________________               541. 86    107, 464. 17    157, 535. 83         30, 113. 23          3, 819. 24

Allotted _______ _____________     _     3, 500. 00      230, 000. 00    -8, 500. 00          36, 475. 21        215, 638. 02


Balance unexpended July 1, 1933         -------           --          -                                      $6, 361. 98
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934____________________-            $14, 000. 00
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933----------__         -____-- -      5, 000. 00
Amount allotted from National Industrial Recovery Act
  approved June 16, 1933------------------------ 208, 000. 00
                                                                                                            227, 000. 00

     Amount to be accounted for-----------                       233, 361. 98
Deductions on account of revocation of allotment --------------- 11, 361. 918

      Net amount to be accounted for_________________________ 222, 000. 00
Gross amount expended     ------------------------------------ 3, 819. 24
      Balance unexpended June 30, 1934-------------        ___    218, 180. 76
Outstanding liabilities June 30, 1934----------           $82. 42
Amount covered by uncompleted contracts_____________ 200, 922. 73
                                                                  201, 005. 15
         Balance available June 30, 1934                                                       _
                                                                                               ____---- 17, 175. 61
Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1_________________________________                                               27, 000. 00

                             5. ONTONAGON                 HARBOR,          MICH.

   Location.-The harbor is situated on the south shore of Lake
Superior. It consists of the improvement of the mouth of Ontona-
gon River. (See U. S. Lake Survey Chart No. 9.)
   Previous project.-Adopted by act of March 2, 1867. The cost
and expenditures were $284,801.24 for new work and $113,326.76
for maintenance, a total of $398,128, prior to commencement of work
under existing project in 1911. For further details see page 1931
of Annual Report for 1915.
  Existing project.-This provides for a channel 150 feet wide and
17 feet deep through the bar; and 100 feet wide and 15 feet deep
between the entrance piers; for two short channels 75 feet wide and
15 feet deep leading from the inner end of the Government piers
to the nearest end of the principal wharves on each side of the river;
and for maintenance of this channel and the 4,990 feet of entrance
piers. The project depth is referred to low-water datum for Lake
Superior, which is taken at 601.6 feet above mean tide level at New
York. The ordinary variation of water level extends from 0 to +1
foot above low-water datum. The estimate of cost for new work,
made in 1910, was $15,400, exclusive of amount expended on previous
project. The latest (1928) approved estimate for annual main-
tenance is $15,000.
   1Exclusive   of available fund:.
            RIVERS AND HARBORS-DULUTH,              MINN., DISTRICT        1011
   The existing project was authorized by the River and Harbor Act
of June 25, 1910, which provided for a channel 15 feet deep at low-
water datum and pier maintenance (H. Doc. No. 602, 61st Cong.,
2d sess.). The latest published map is in the last-mentioned
document.
   Terminal facilities.-There are no publicly owned wharves. There
are one merchandise and coal wharf, one coal wharf, and a few small
fish wharves in active use. The terminal facilities are adequate for
the commerce of the harbor.
   Operations and results during fiscal year.-Maintenance dredging
was done in June 1934, in which time a total of 18,640 cubic yards
was removed. Minor repairs were made to portions of the piers.
The costs were $8,576.27 for dredging and $2,679.88 for pier repairs,
making a total of $11,256.15, all for maintenance. The total ex-
penditures during the year were $12,976.33.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1925 at a saving of $10,940 under the estimated cost. The
piers are in good condition except for the inner 834 feet of the east
pier which is in poor condition.
   At the end of the fiscal year the project depths of 17 feet in the
lake approach and 15 feet in the balance of the channels were avail-
able.
    The total costs were $4,460 for new work and $323,473.66 for
maintenance, making a total of $327,933.66.
   The total expenditures were $329,653.84.
    Proposed operations.-The balance unexpended June 30, 1934,
 $42,018.11, will be applied to maintenance, as follows:
Dredging with United States dipper dredge Gaillard, May 1935_ ___ $10, 000. 00
Piers-minor repairs by hired labor, September 1934-__ _-_        _  5, 000. 00
Pier-recapping inner 834 linear feet of east pier with concrete by
  hired labor, July to September 1934_______________------------   27, 018. 11

      Total---------------------------------------------------         42, 018. 11
  Annual maintenance dredging and minor repairs to stone-covered
portions of piers will be necessary. The additional sum of $19,000
can be profitably expended during the fiscal year 1936 as follows:
Maintenance:
   Dredging with United States dipper dredge Gaillard, spring of
      1936----------------------------------------------------- $14,000
   Piers, minor repairs to stone-covered portions by hired labor, fall
      of 1935                       ------------------------------     5, 000

         Total----------------------------------------         --         19, 000

                          Cost and financial summary
,Cost of new work to June 30, 1934_  -----------------------------  $289, 261. 24
Cost of maintenance to June 30, 1934_--------------------------      436, 800. 42
       Total cost of permanent work to June 30, 1934------------     726, 061. 66
Value of plant, materials, etc., on hand June 30, 1934-------------    1, 288. 75
        Net total cost to June 30, 1934_________________ ____----.   727, 350. 41
Plus accounts receivable June 30, 1934----------                          431. 43
        Gross total costs to June 30, 1934                           727, 781. 84
Net total expenditures_____              _                           727, 781. 84
TJnexpended balance June 30, 1934_ _         -             -   - -    42, 018. 11
        Total amount appropriated to June 30, 1934-                  769, 799. 95
1012        REPORT      OF      CtHIEF     OF ENGINEERS,            U. S.          ARMY,          1934


   Fiscal year ending June 30            1930        1931                1932              1933             1934


Cost of new work ...............................
Cost of maintenance-.............   $22,789.89     $46, 689. 13     $18, 010. 07         $35, 974. 67      $11, 256. 15
     Total cost_                     22, 789. 89    46, 689. 13         18, 010. 07       35, 974. 67       11, 256. 15-
Total expended                       19, 310. 35    38, 725. 82         30, 764. 05       34, 635. 64       12, 976. 33
Allotted_        _                   55, 000. 00    55, 000. 00    -24, 500. 00           16, 772. 96       54, 994. 44



Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934----------------------------------                $42, 000. 00
Amount allotted from War Department Appropriation Act approved
Mar. 4, 1933__--- --------------------------------------------  13, 000. 00

     Amount to be accounted for__        ---                                                            55, 000. 00
Deductions on account of revocation of allotment_-----                                     -                  5. 56

     Net amount to be accounted for---------------------------                                          54, 994. 44
Gross amount expended                                                                                   12, 976. 33

      Balance unexpended June 30, 1934-                            --                          __       42, 018. 11
Accounts receivable June 30, 1934_--                         ---                ------                      431. 43

        Unobligated balance available June 30, 1934                                                      2,449. 54
                                                                                                        4--------------

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance ------------------------------                                               19,000. 00
                          6. KEWEENAW WATERWAY, MICH.

  Location.-This waterway is a navigable channel, minimum width
120 feet, 25 miles long, partly natural and partly artificial, across
Keweenaw Point, Mich. (See U. S. Lake Survey Chart No. 944.)
  Existing project.-This provides for a navigable channel across
Keweenaw Point approximately 25 miles long, 20 feet deep, with
least bottom width of 120 feet, with necessary pile and timber revet-
ments; for a stone-filled timber-crib pier 3,714 feet long at the lower
entrance extending to 20-foot depth of water; for converging stone-
filled timber-crib breakwaters at upper entrance, with westerly break-
water 2,745 feet long and easterly breakwater 2,485 feet; for an upper
entrance anchorage basin 3,600 feet long by 600 feet wide, with
5,924 feet of timber mooring piers; for a lower anchorage basin one-
half mile long and 800 feet wide, with a timber mooring pier 2,000
feet long; and for a curved cut-off channel at Princess Point 200 feet
wide, 20 feet deep, and about three-fourths of a mile long. The
project depth is referred to low-water datum for Lake Superior.
The estimate of cost for new work, revised in 1919, was $2,723,000.
The latest (1928) approved estimate for annual maintenance is
$100,000.
    On account of its length, the waterway is affected in a very slight:
degree by lake fluctuations of short duration. The annual fluctuation
is about 1 foot.
    The existing project was authorized by the following river and
harbor acts: The act of September 19, 1890, provided for a 16-foot
   1Exclusive    of available funds.
           RIVERS AND HARBORS-DULUTH,          MINN.,   DISTRICT   1013
channel of 70-foot bottom width, the renewal of canal revetments,
the reconstruction and extension of piers at the upper entrance to
30-foot depth of water, and at the proper time for the increase of
the channel depth to 20 feet with bottom width of not less than 120
feet; by modification approved March 15, 1898, the increase in width
and depth of channel was authorized (H. Doc. No. 105, 49th Cong.,
2d sess.); the act of June 25, 1910, provided for an anchorage basin
just within the lower entrance about one-half mile long, 800 feet
wide; for a, mooring pier on its westerly side 2,000 feet in length;
and for the purchase of the necessary land (H. Doc. No. 325, 60th
Cong., 1st sess.); and the act of March 2, 1919, provided for the
Princess Point cut-off channel (H. Doc. No. 835, 63d Cong., 2d sess.).
The latest published maps are in the last-mentioned document and
House Document No. 55, Seventy-third Congress, first session.
   Recommended modifications of project.-Under date of February
6, 1933, the Chief of Engineers recommended modification of the
existing project so as to provide, including work already accom-
plished, for a waterway across Keweenaw Peninsula via Portage
Lake, 25 feet deep and 300 feet wide, increased to 400 feet through
Portage Lake below the shoal at its head and with a straight cut-off
channel from Princess Point to Messner's Point; for a flaring east-
ern entrance from Keweenaw Bay, 28 feet deep in the outer portion,
diminishing to 25 feet in the inner portion; protected by break-
water 5,714 feet long; for a mooring basin inside the east entrance,
one-half mile long, 800 feet wide and 25 feet deep with mooring piers
protected by fender pilingg; for converging breakwaters at the west-
ern entrance, with westerly breakwater 2,645 feet long and easterly
breakwater 2,485 feet, having an entrance 500 feet wide between the
breakwaters; for a western entrance channel 32 feet deep lakeward of
the entrance between the breakwaters, diminishing to 25 feet'in quiet
water and enlarged inside of the breakwaters into a maneuvering
basin 1,000 feet in maximum width and 3,000 feet long; for a moor-
ing basin inside the west entrance 3,600 feet long and 800 feet wide
and 25 feet deep, with mooring piers protected by fender piling; and
for revetting the banks as necessary, and new pierheads 400 feet long
at the west entrance to the canal, at a total estimated cost, in addition
to funds already expended, of $2,650,000, with maintenance estimated
at a total of $60,000 annually (H. Doc. No. 55, 73d Cong., 1st sess.).
   Terminal facilities.-There are 31 privately owned wharves, hav-
ing a combined length of 19,040 linear feet, which are served by
improvements made along Keweenaw waterway. The city of Han-
cock has one publicly owned wharf. The village of Houghton has
wharf improvements at the ends of three streets. The facilities are
considered adequate for existing commerce.
   Operations and results during fiscal year.-The following main-
tenance work was done with United States plant and hired labor:
105,846 cubic yards of material were dredged from the upper en-
trance and canal and in Portage Lake, 3,284 tons of stone were placed
as maintenance repairs to the breakwaters at the upper entrance, and
380 feet of mooring pier and 250 feet of revetment on the west side
of the Lily Pond were removed.      The shore connections to the upper
1014      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                19 34

entrance breakwaters were capped with concrete by contract, a total
length of 1,207 feet.
  The costs of the work done during the year were $28,031.65 for
dredging, $63,483.18 for breakwaters, $1,229.72 for revetments and
mooring piers, $1,101.79 for inspections and surveys, $3,255.65 for
waterway patrol, making a total of $97,101.99, all for maintenance.
The total expenditures during the year were $96,965.06.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1926 at a saving of $749,652.41 under the estimated cost.
The breakwaters are in good condition except for a weakness occur-
ring in about 300 feet of the substructure of the breakwater at the
lower entrance. The remaining timber revetments along the water-
way are in fair condition. The northerly 1,054 feet of timber moor-
ing pier at the east side of Lily Pond Harbor of Refuge and the 2,000-
foot length mooring pier at the Portage River Harbor of Refuge are
badly decayed and should be repaired. Annual redredging of chan-
nels will be required indefinitely. The controlling depth, as shown
by the last survey completed in March 1934, was 20 feet. The costs of
the existing project were $1,973,347.59 for new work and $1,573,519.44
for maintenance, a total of $3,546,867.03. The total expenditures
were $3,550,281.87.
  Proposed operations.-The balance unexpended June 30, 1934,
$116,886.24, will be applied to maintenance as follows:
Accounts payable June 30, 1934------------------------------            $294. 29
Dredging with U. S. dipper dredge Gaillard, July and August 1934__ 31, 000. 00
Breakwaters, upper entrance, minor repairs with U. S. derrick
  boat Coleman, July and August 1934--------------------__            14, 000. 00
Breakwater, lower entrance, repairs to substructure with hired labor,
  September and October 1934_ ----------------------------            15, 000. 00
Mooring pier, Lily Pond, 1,054 linear feet, repair substructure and
  cap with concrete by hired labor, May and June 1935 ------- __      49, 00. 00
Revetments, minor repairs with hired labor, July and August 1934_ 7, 591. 95
       Total_________-------------------------         -              116, 886.24
  Annual dredging for the removal of shoals and minor repairs to
breakwaters and revetments will be necessary. The mooring pier at
the Portage River Harbor of Refuge should be rebuilt and capped
with concrete. The additional sum of $125,000 can be profitably
expended during the fiscal year 1936 as follows:
Maintenance:
    Dredging with U. S. dipper dredge Gaillard during summer of
      1935 ----       - -     ------------------------------ $22, 000
    Repairs to upper entrance breakwater with hired labor, summer
      of 1935--------------     ------------------------           15, 000
    Repairs to lower entrance breakwater with hired labor, fall of
       1935 ---------          -----------------                     --      8, 000
    Repairs to 2,000 linear feet of mooring pier at Portage River Har-
      bor of Refuge under continuing contract; work to be started
      during the spring of 1936 (40 percent of completion expected to
     be accomplished) -------------------------------------            70, 000
    Repairs to revetments with hired labor, summer of 1935---------10, 000
       Total --------------------------------------                        125, 000
                 RIVERS AND HARBORS-DULUTH,                            MINN., DISTRICT                     1015
                                    Cost and financial summary

Cost of new work to June 30, 1934_________________-----------                                   $1, 973, 347. 59
Cost of maintenance to June 30, 1934_ _________---------                                         1, 573, 519. 44

      Total cost of permanent work to June 30, 1934 _______- _                                   3, 546, 867. 03
Value of plant, materials, etc., on hand June 30, 1934__________                                      3, 709. 13

     Net total cost to June 30, 1934_________________________                                    3, 550, 576. 16
Minus accounts payable June 30, 1934                                                                     294. 29

        Net total expenditures______________________--_                                          3, 550, 281. 87
Unexpended balance June 30, 1934_________________________                                             116, 886. 24

        Total amount appropriated to June 30, 1934_____________                                  3, 667, 168. 11

   Fiscal year ending June 30           1930            1931           1932              1933             1934


Cost of new work--              -
Cost of maintenance-----------       $118, 326. 60   $154, 597. 82   $76, 955. 34      $74, 424. 59      $97, 101. 99
Total expended----------------         98, 686. 16    155, 468. 87    86, 149. 01       72, 985. 01       96, 965. 06
Allotted_   -   - -       -           161, 000. 00     60, 000. 00    28, 500. 00      137, 116. 49      149, 718. 49


Balance unexpended July 1, 1933___________________--__--___--         $64, 132. 81
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934___________________--___     $113, 000. 00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933_____________--_--.._           53; 000. 00
                                                                      166, 000. 00
     Amount to be accounted for _--    -    ----                     230, 132. 81
Deductions on account of revocation of allotment ------------------- 16, 281. 51

       Net amount to be accounted for------_______-----                                               213, 851. 30
Gross amount expended___________________________                                    $98, 130. 51
Less reimbursements collected____________________                                     1, 165. 45
                                                                                                       96, 965. 06

      Balance unexpended June 30, 1934_                                                               116, 886. 24
Outstanding liabilities June 30, 1934_ ________                                                            294. 29

        Balance available June 30, 1934__________----------------                                     116, 591. 95

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1______----______--_________---_       125, 000. 00

                7. MARQUETTE BAY, HARBOR OF REFUGE, MICH.

   Location.--This harbor (known also as Presque Isle Harbor),
situated on the south shore of Lake Superior within the city limits
of Marquette and about 3 miles distant from Marquette Harbor, is
about 11/2 miles long and one-half mile wide and is protected by a
breakwater. It is an indentation in the shore behind Presque Isle
Point. (See U. S. Lake Survey Chart No. 935.)
   Existing project.-This provides for a 1,000-foot stone-filled timber
crib breakwater off Presque Isle Point and a 216-foot shore exten-
sion. The project is referred to low-water datum for Lake Superior,
which is taken at 601.6 feet above mean tide level at New York.
  'Exclusive of available funds.
_1016    REPORT OF     CHIEF OF ENGINEERS,        U. S.   ARMY,   1934

The harbor is subjected to fluctuations of water level, not exceeding
2 feet, due to wind and barometric conditions and to annual varia-
tions of about 1 foot.
    The estimate of cost for new work, made in 1902, was $57,500. The
latest (1918) approved estimate for annual maintenance is $1,500.
    The existing project was authorized by the following river and
harbor acts: The act of June 3, 1896, provided for a 1,000-foot
breakwater off Presque Isle Point (H. Doc. No. 318, 54th Cong., 1st
sess.); the act of June 13, 1902, provided for the 216-foot shore
.extension (Annual Report for 1903, pp. 474, 1823). The latest pub-
lished map is in House Document No. 473, Seventy-second Congress,
:second session.
    Recommended modifications of project.-Under date of August 9,
1932, the Chief of Engineers recommended modification of the exist-
ing project so as to provide for an extension of the breakwater by
1,600 feet and dredging the harbor to a depth of 26 feet in the inner
portion and 28 feet at the entrance, at an estimated cost of $547,000
with maintenance estimated at the rate of $4,000 annually in addi-
tion to that now required. A change in the designation of the proj-
ect to " Presque Isle Harbor, Mich.", was also recommended (H. Doc.
No. 473, 72d Cong., 2d sess.).
    Terminal facilities.-There is one wharf for handling pig iron
and one ore dock. The facilities are considered adequate for existing
,commerce.
    Operations and results during fiscal year.-Riprap amounting to
3,034 tons was placed around the base of the breakwater where under-
mining was threatened. The total costs and expenditures were
$9,972.86 for maintenance.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1903 at a saving of $2,444 under the estimated cost. The
breakwater is in good condition.
    The controlling depth in the harbor on June 30, 1934, was over 21
feet below low-water datum.
    The costs and expenditures were $55,056.34 for new work and
$109,863.26 for maintenance, a total of $164,919.60.
    Proposed operations.-The balance unexpended June 30, 1934,
 $5,000, will be applied mainly to riprapping beach at inner end of
breakwater with hired labor in August 1934.
    No work is contemplated during the fiscal year 1936; therefore no
funds can be profitably expended.
                          Cost and financial summary

Cost of new work to June 30, 1934____________________                 $55, 056. 34
Cost of maintenance to June 30, 1934_______________________           109, 863. 26

        Total cost of permanent work to June 30, 1934______________   164, 919. 60

Net total expenditures_________-------- -----------------------       164, 919. 60
Unexpended balance June 30, 1934______________________________          5, 000. 00

        Total amount appropriated to June 30, 1934_______________     169, 919. 60
                     RIVERS AND HARBORS---DULUTH,                                MINN., DISTRICT               1017

    Fiscal year ending June 30                   1930               1931         1932          1933           1934

                               ---
rC ost of new work.. . . . -- .---                      . .     . . . . . . . . . . . . ...   . . . .
Cost ofmaintenance ._ __ .                       $561. 18 .       ......  . . ......            ...          $9, 972. 86
'Total expended -          .......-                561. 18 -[                                   -- ----        9, 972. 86
Allotted--... ..........              .                         _           -                  $10, 000        4, 972. 86


Balance unexpended July 1, 1933---------------------------                                                $10, 000. 00
Amount allotted from War Department Appropriation Act approved
    Apr. 26,        1934   __-----------------                                                              5,000.00

      Amount to be accounted for----------------------------                                               15, 000. 00
.Deductions on account of revocation of allotment_                                                              27. 14

           Net amount to be accounted for _--                                                              14, 972. 86
tGross     amount expended----------------------------------------___                                       9, 972. 86

           Balance unexpended June 30, 1934___                                                              5, 000. 00
                                  8. MARQUETTE HARBOR, MICH.

   Location--This harbor is situated in Marquette Bay on the south
:shore of Lake Superior, 160 miles west of Sault Ste. Marie, Mich.,
and 256 miles east from Duluth, Minn. (See U. S. Lake Survey
Chart No. 935. )
    Existing proect.--This provides for a 4,500-foot breakwater, the
inner 3,000 feet of stone-filled timber cribs, and the outer 1,500 feet of
rubble-mound construction, and for the removal of a small shoal to
 .a depth of 22 feet, giving a protected area of 350 acres. The project
 (depth is referred to low-water datum for Lake Superior, which is
taken at 601.6 feet above mean tide level at New York. This harbor
is subject to very -marked undertow, with a consequent fluctuation
during storms amounting at times to 21/2 feet. The annual fluctua-
Etion is about 1 foot. The estimate of cost for new work, made in
  1910, was $1,228,000. The latest (1918) approved estimate for
annual maintenance is $5,000.
    The existing project was authorized by the following river and
harbor acts: The act of March 9, 1867, provided for a 2,000-foot
ibreakwater (H. Doc. 'No. 56, 39th Cong., 2d sess., and Annual Report
for 1866, pp. 8 and .77); the act of August 11, 1888, provided for a
1,000-foot extension of the breakwater (Annual Report for 1889,
_pp. 272 and 2021); the act of June 25, 1910, provided for an addi-
tional 1,500-foot extension of the breakwater and for the removal
of a shoal in the northerly part of the harbor (H. Doc. No. 573, 61st
'Cong., 2d sess.). The latest published map is in Rivers and Harbors
Committee -Document No. 20, Seventy-second Congress, first session.
    Supplementing the work authorized by Congress, the deepening
of certain areas of the harbor from 22 to 25 feet as recommended
by the Chief of Engineers in Rivers and Harbors Committee Docu-
ment No. :20, Seventy-second Congress, first session, has been in-
cluded in the Public Works program under the National Industrial
Recovery Act.
    Recommended nodifcations of project.-Included in Public W orks
program.
    Terminal facilities.-These consist of 1 ore dock, 1 coal dock, 2 old
  wharves slightly used, 1 freight and passenger wharf, and 1 oil pier.
1018     REPORT   OF CHIEF OF     ENGINEERS, U.       S. ARMY,   1934


   There are also several small fish wharves without railroad con-
nections.
  The facilities are considered adequate for existing commerce.
  Operations and results during fiscal year.-Maintenance work in-
volved the placing of 3,627 tons of stone in repairing the breakwater
during July 1933 and June 1934. The total costs from regular funds
were $12,205.11 and the expenditures $11,953.46, all for maintenance.
  Prior to dredging surveys were made and 6,248 cubic yards of
material removed during May 1934 by contract in connection with
the deepening of harbor area authorized by the Federal Emergency
Administration of Public Works. The total costs were $4,801.84 and
the expenditures $4,228.19, all for new work.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1922 at a saving of $182,943 under the estimated cost. The
concrete-covered breakwater Was completed in the fiscal year 1905,
the dredging in 1910, and the rubble-mound portion of the break-
water in 1922. The rubble-mound portion of the breakwater has
settled in places and patching and resurfacing is necessary on a
portion of the concrete-capped breakwater.
   The controlling depth in the harbor on June 30, 1934, was 22 feet.
   The costs of the existing project were $1,045,123.51 for new work.
and $309,116.64 for maintenance, a total of $1,354,240.15. The total
expenditures were $1,353,961.79.
   Operations under the Public Works program are about 4 percent
complete. The total costs of this work to date were $4,801.84 and the
expenditures $4,228.19, all for new work.
   The total cost of the improvement, all funds, was $1,359,041.99, of
which $1,049,925.35 was for new work and $309,116.64 for mainte-
nance. The total expenditures were $1,358,189.98.
  Proposed operations.-The balance unexpended June 30, 1934,
$15,921.90, will be applied to maintenance, as follows:
Repairs to rubble-mound portion of breakwater with U. S. derrick
  boat Coleman during May and June 1935__                        $12, 000. 00
Patching and resurfacing portions of concrete superstructure of
  breakwater with hired labor, June 1935 ______________________    3, 921. 90

       Total for maintenance________________________                 15, 921. 90
  The balance, $74,971.81, of allotment from the National Industrial
Recovery Act will be applied to completing new work dredging of
the harbor area to a depth of 25 feet under existing contract, July to
November 1934.
  The additional sum of $15,000 can be profitably expended during
the fiscal year 1936 for maintenance repairs to the breakwater with
U. S. derrick boat Coleman in the spring of 1936.
                         Cost and financial summary
                    MAINTENANCE   AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934_____________________________ $1, 045, 123. 51
Cost of maintenance to June 30, 193_____________________           309, 116. 64
       Total cost of permanent work to June 30, 1.934           1, 354, 240. 15
Minus accounts payable June 30, 1934________________________            278. 36
       Net total expenditures                                   1, 353, 961. 79
Unexpended balance June 30, 1934_                                   15, 921. 90
       Total amount appropriated to June 30, 1934_-----         1, 369, 883. 69
                    RIVERS AND HARBORS-DULUTHI,                                  MINN., DISTRICT                          1019

          Fiscal year ending June 30                  1930           1931           1932                  1933            1934

Cost of new work ....---              -   ---             .9---
                                                              -  7,8--_ - -$2-,        2            --      -
Cost of maintenance_ --- _                        $5, 860. 96   $7, 814. 63 $28, 139. 32            $21, 580. 79       $12, 205.11
Total expended-------------------------683. 49                      6, 648. 63    34, 467. 59        21, 569. 28           953. 46
                                                                                                                         11,
Allotted --------------       ----------------- 11, 500. 00        20, 029. 42     9, 500. 00        24, 429. 44        25, 000. 00


Balance unexpended July 1, 1933---------------------             $2, 875. 36
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934__----------------------$14, 000. 00
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933---------------- ------- 11, 000. 00
                                                                 25, 000. 00

Amount to be accounted for        --------------------------------                                                   27, 875. 36
Gross amount expended-- -----------------------------------                                                          11, 953. 46

Balance unexpended June 30, 1934                                      921.90
                                                                  1---------------------------5
Outstanding liabilities June 30, 1934----------------------------     278. 36

Balance available June 30, 1934                                                                                          643. 54
                                                                                                                     15---------------------------

Amount that can be profitably expended in fiscal year ending June
                           ---- - --- -- --- -- --- -- --- -- --- --
30, 1936 for maintenance 1__                                        15, 000. 00
                                            PUBLIC     WORKS       FUNDS


Cost of new work to June 30, 1934---------------------------                                                     -   $4, 801. 84
Cost of maintenance to June 30, 1934___
      Total cost of permanent work to June 30, 1934---------------4, 801. 84
Plus accounts receivable June 30, 1934_-                              40. 00
          Gross total costs to June 30, 1934_                                                                         4, 841. 84
Minus accounts payable June 30, 1934                          --                  ---------                              613. 65

     Net total expenditures-------------------------------                                                            4,228. 19
Unexpended balance June 30. 1934------------------------------                                                       74, 971. 81
          Total amount appropriated to June 30, 1934---                                              --              79, 200. 00

          Fiscal year ending June 30                  1930           1931           1932                  1933            1934

Cost of new work ......................|--..._                                                  -  - --         $4, 801. 84
Cost of maintenance ....................-----                                     -------       ---------- ------ ------
Total expended-           -                     -.-     - - - - - - - -- -- - - - - -- - - - - -                          4, 228 19
             --------------------------------- ------------ --------------------- 79, 200. 00
Allotted.........


Amount allotted from National Industrial Recovery Act approved
  June 16, 1933     __----------------------------------------- $79, 200. 00
Gross amount expended ------------------------------------ 4,228. 19
      Balance unexpended June 30, 1934---------------------74, 971. 81
Outstanding liabilities June 30, 1934--------------------    $613. 65
Amount covered by uncompleted contracts                    0, 525. 19
                                                          7------------
                                                                        71, 138. 84
     Balance available June 30, 1934-------------------------                                                         3, 832. 97
Accounts receivable June 30, 1934                                                                                         40. 00

          Unobligated balance available June 30, 1934------------__                                                   3,872. 97
   'Exclsive of available funds.
1020          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                      :9134'

   CONSOLIDATED        COST AND, FINANCIAL     SUMMARY               FOR      MARQUETE                  HARBOR,          MICH.


Cost of new work to June 30, 1934            ---------------                         ----                  $1, 049, 925. 35
Cost of maintenance to June 30, 1934_-----                                                                        309, 116. 64

      Total cost of permanent work to June 30, 1934__                                                        1, 359, 041. 99
Plus accounts receivable June 30, 1934----------------                                                                40. 00

     Gross total costs to June 30, 1934----------------------                                                1,   359, 081. 99
Minus accounts payable June 30, 1934------------------------                                                           892. 01

           Net total expenditures_                                                                            , 358, 189. 98
                                                                                                             1--------
Unexpended balance June 30, 1934-------------------------_                                                           90,893. 71

           Total amount appropriated to June 30, 1934                                                           449, 083. 69
                                                                                                             1---------------,
                                                                              I                  i                   I

           Fiscal year ending June 30         1930                  1931              1932               1933              1934
              wor f ne
             Cost
Cost of new work _.                                                                                                      $4, 801. 841
Cost of maintenance.                        $5, 860. 96       $7,   814. 63       $28, 139. 32        $21, 580. 79       12, 205. 11
      Total cost_                            5, 860. 96        7, 814. 63          28, 139. 32         21, 580. 79        17, 006. 95
Total expended __                              683.49          6, 648. 63          34, 467. 59         21, 569. 28        16, 181. 65;
Allotted                                    11, 500. 00       20, 029. 42           9, 500. 00         24, 429. 44       104,200.00
                                        I                 t                   I                  I'                  I




Balance unexpended July 1, 1933-_-________         _______-____                                                      $2, 875. 36;
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934________________________ $14, 000. 00
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933__________________________   11, 000. 00'
Amount allotted from National Industrial Recovery Act
  approved June 16, 1933 __79,                              200. 00
                                                                                                             -    104, 200. 01

      Amount to be accounted for-------------------------                                                         107, 075. 3
Gross amount expended ----------------------------------------                                                     16, 181. 65
      Balance unexpended June 30, 1934 -------------------------                                                     90, 893. 71
Outstanding liabilities June 30, 1934_                     $892. 01
Amount covered by uncompleted contracts____________ 7 , 525. 19
                                                                                                                     71, 417. 20
      Balance available June 30, 1934________      _______                                                           19, 476. 51
Accounts receivable June 30, 1934_________________________                                                                40.00

           Unobligated balance available June 30, 1934 _____                                                 _       19,516. 51

Amount that can be profitably expended in fiscal year endiLng June
                            -
   30, 1936, for maintenance 1_                               ____---                                                15. 000. 00:

                  9. GRAND MARAIS HARBOR OF REFUGE, MICH.

  Location.-The harbor is situated on the south shore of Lake,
Superior, 314 miles east of Duluth, Minn., and 93 miles west of
Sault Ste. Marie, Mich. (See U. S. Lake Survey Chart No. 9.)
   Existing project.-This provides for parallel timber-crib piers 500'
feet apart-aggregate length 3,450 feet-extending out to a depth
in the lake of 22 feet at ordinary low water; for closing the natural
entrance by a pile dike 5,770 feet long; and for dredging a channel
   1Exclusive of available fund;.
                    RIVERS AND HARBORS-DULUTH,                                   MINN., DISTRICT                   1021
300 feet wide and 18 feet deep between the piers, and 500 feet wide
and 20 feet deep at the lake approach. The project depth is referred
to low-water datum for Lake Superior, which is taken at 601.6 feet
above mean tide level at New York. The ordinary variation of
water level extends from 0 to +1 foot above low-water datum. The
latest approved estimate of cost for new work, revised in 1894, is
$484,000. The latest (1918) approved estimate for annual mainte-
nance is $15,000.
   The existing project, except for the pile dike, was adopted by the
River and Harbor Act of June 14, 1880, pursuant to which plans
were approved by the Secretary of War August 5, 1881 (Annual
Report for 1881, p. 2050). The project was extended in 1894 to pro-
vide for the pile dike (Annual Report for 1895, p. 351). For the
latest published map see House Document No. 1286, Sixty-fourth
Congress, first session.
   Terminal facilities.-There is no rail connection with the harbor.
There are 2 fish wharves and 1 general-merchandise wharf. The
facilities are considered adequate for present needs.
   Operations and results during fical year.-The total costs and
expenditures were $9,991.31 for maintenance repairs to the entrance
piers, consisting in placing 3,856 tons of riprap along their bases
where undermining was threatened.
   Condition at end of fiscal year.-The existing project is 85 percent
completed. Parallel piers were built 500 feet apart, 1,912 and 1,545
feet long, respectively, and a pile revetment 100 feet long at the in-
ner end of each pier; a channel 250 feet wide and 18 feet deep was
dredged between the piers from the lake to the bay; and a pile dike
was built in 1895-97 to close the natural entrance, 5,770 feet in
width. The piers are in fair condition. The timber portion of the
pile dike is in poor condition and the stone protection has settled.
The controlling depth in the channel is 16 feet, as shown by a survey
of May 1934. To complete the project there remains to construct
193 linear feet of crib piers and dredging to widen the inner portion
of the channel, now 250 feet wide, to the project width of 300 feet.
This work is not considered necessary to meet present requirements
of navigation.
   The costs and expenditures were $355,885.29 for new work and
$404,449.90 for maintenance, a total of $760,335.19.
   Proposed operations.-No funds are available; no work is con-
templated during the fiscal years 1935 and 1936.
                                        Cost   and financial sumnn.ary
Cost of new work to June 30, 1934_____________________________ _ $355, 885. 29
Cost of maintenance to June 30, 1934_                             404, 449. 90
      Total cost of permanent work to June 30, 1934____________ 760, 335. 19
Net total expenditures ____________________--                     760, 335. 19
Total amount appropriated to June 30, 1934______________________                                              760, 335. 19

         Fiscal year ending June 30                     1930          1931           1932             1933         1934


Cost of new work           ---------------      ----              . ----------- ---   -- ----------      --
Cost of maintenance_---      _     -- -----         $1, 498. 00     $21, 608. 72 $19. 686. 06                     $9, 991. 31
Total expended       ...     _                      2,084. 06      20, 289. 91    18, 279. 42                      9, 991. 31
A lotted ..     _                  ..     .     .. 1.    0. 00       6. 0,00       6, 000. 00 1                    9, 991. 31
1022     REPORT OF     CHIEF OF ENGINEERS,          U.   S.   ARM1VY,   1934

Amount allotted from War Department Appropriation               Act ap-
proved Mar. 4, 1933--------------------                                     $10, 000.00
Deductions on account of revocation of allotment                                    8. 69

      Net amount to be accounted for__                                            991. 31
                                                                               9---------------------------
Gross amount expended-----------------------------            $10, 258. 77
Less reimbursements collected----------------------
                                                 __                267. 46
                                                                               9, 991.31

      Balance unexpended June 30, 1934                                         0. 00
                                                              _---------------------
Amount (estimated) required to be appropriated for completion of
existing project--------------------------------------------        128, 000. 00

               10. WARROAD HARBOR AND RIVER, MINN.

   Location.-Warroad Harbor and River are at the southwestern
extremity of Lake of the Woods, 36 miles west of the mouth of Rainy
River. (See U. S. Lake Survey Chart No. 842, Lake of the Woods.)
   Existing project.-This provides for dredging and maintaining a
channel 8 feet deep from the landing at Warroad to deep water in
the lake, the channel being 9,200 feet long, 200 feet wide within the
harbor, and 300 feet wide out in the lake; for a turning basin 500 by
900 feet to a depth of 8 feet; and for a pile-brush-stone jetty on the
north side of the channel extending from the shore 700 feet into the
lake. The project depth is referred to low-water datum, for Lake
of the Woods, which is taken at 1,056 feet above mean tide level at
New. York. This depth corresponds to a depth of 10 feet on Lake
Survey Chart No. 842 of this locality. The estimate of cost for new
work, revised in 1928, is $118,000. The latest (1928) approved esti-
mate for annual maintenance is $10,000.
   The project was adopted by the River and Harbor Act of March 3,
1899, and modified by the following river and harbor acts: June 6,
1900; June 13, 1902 (H.Doc. No. 92, 56th Cong., 2d sess.); March 3,
1905; June 25, 1910 (H. Doc. No. 703, 61st Cong., 2d sess.) ; and July
25, 1912. The latest published map is opposite page 1984 in the
Annual Report for 1911.
   Reconmended modifcations of project.-Under date of June 24,
1926, the Chief of Engineers recommended that the project be cur-
tailed by reducing the channel width to 100 feet and the turning
basin to 250 feet. (H. Doc. No. 467, 69th Cong., 1st sess.)
   Terminal facilities.-A pile and plank wharf 80 feet in length has
been provided by the village of Warroad for free use by the public.
Two commercial companies' fish wharves 60 feet in length are not
open to the public. These wharves are served by spur tracks. There
are also a number of minor wharves.
   These facilities are ample for the needs of existing commerce.
   Operations and results during fiscal year.-Maintenance work
consisted of dredging during May and June 1934 with United States
plant, a total of 61,547 cubic yards at a cost of $16,865.02. The
total expenditures during the year were $10,373.71.
   Condition at end'of fiscal year.-The project as a whole is 76 per-
cent completed. The protective jetty was completed in 1910 and
reconstructed as a rubble mound in 1929. It is in good condition.
The turning basin at the Warroad wharves was completed in 1911,
                      RIVERS AND HARBORS-DULUTH,                                           MINN., DISTRICT                      1023

and a channel 200 feet wide and 8 feet deep was completed in 1915.
The controlling depth in the channel in June 1934 was 8 feet below
low-water datum, which is 1,056 feet above mean tide level at New
York, for a least width of 100 feet. Annual maintenance is neces-
sary. The shore revetment is in need of minor repairs.
   The work to be done to complete that part of the existing project
outside of the present used dredging lines consists of widening the
lake channel from 200 to 300 feet for a distance of 7,460 feet. This
has not been done, because the additional width is not necessary to
meet present requirements.
   The total costs of the existing project at the end of the fiscal year
were $83,805.36 for new work and $226,161.23 for maintenance, a
total of $309,966.59. The total expenditures were $352,423.18.
   Proposed operations.--The balance unexpended June 30, 1934,
$19,177.93, will be applied to maintenance, as follows:
Dredging with U. S. pipe-line dredge Traverse, May and June 1935_ $14, 177. 93
Minor repairs to shore revetments with hired labor, July and August
  1934--------------------------       -----------------------      5, 000. 00

           Total--                                         -------------------------------                                     1-----------
                                                                                                                           1,9,77.   93
  The additional sum of $15,000 can be profitably expended during
the fiscal year 1936 for maintenance dredging with U. S. pipe-line
dredge Traverse during the summer of 1936.
                                                Cost and financial summary

Cost of new work to June 30, 1934-------------------- ------                                                           $83, 805. 36
Cost of maintenance to June 30, 1934--__ ---------------                                                               226, 161.23

      Total cost of permanent work to June 30, 1934___-_____...   309, 966. 59
Value of plant, materials, etc., on hand June 30, 1934_______-___ 43, 959. 90
      Net total cost to June 30, 1934 ------------------------                                                         353, 926. 58
Minus accounts payable June 30, 194-_----4 -----------------                                                             1, 503. 40

     Net total expenditures-----------------------------                                                               352, 423. 18
Unexpended balance June 30, 1934--_________--------------                                                               19, 177. 93
            Total amount appropriated to June 30, 19384--------                                                       - 371, 601. 11

            Fiscal year ending June 30                          1930           1931             1932           1933             1934

Cost of new work                                                                       ----                                         .-----------------------
Cost of maintenance            .....------------------       $37, 376. 66   $31, 103. 27      $3, 862. 18   $25, 523. 03      $16, 865. 02
Total expended---....---.._---......----------------.         25, 711. 79    23, 600.49       13, 071. 52    17, 335. 90       10, 373. 71

Allotted ...................----------------------------      34, 000. 00    13, 500.00    ------------      22, 903. 10       23, 898. 01


           91536-ENG 1934-65
1024     REPORT OF CHIEF OF ENGINEERS,               U.   S.   ARMY,   1934

Balance unexpended July 1, 1933----------------------------- $5, 653. 6,
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934___________________-    $15, 000. 00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933------------------------ 9,000. 00
                                                                24, 000. 00

     Amount to be accounted for--------------------------                  29, 653.63
Deductions on account of revocation of allotment                               101.99

      Net amount to be accounted for------------------------29, 551. 64
Gross amount expended----------------------------------- 10, 373.71
      Balance unexpended June 30, 1934------------------ ---- 19, 177. 93
Outstanding liabilities June 30, 1934 -------------------------- 1, 443. 40

       Balance available June 30, 1934------------------------             17, 734. 53
Amount (estimated)         required to be appropriated for completion
  of existing project    1     ---------------                             34, 000. 00

Amount that can be profitably expended in fiscal year ending June
                                             -- -- - -- - -- - -- - -- - --
30, 1936, for maintenance 1                                                15, 000.00

                 11. BAUDETTE HARBOR AND RIVER, MINN.

  Location.-Baudette River has its source in the swamp lands of
northern Minnesota and flows in a northeasterly direction to Rainy
River, its mouth being about 10 miles from where Rainy River
empties into Lake of the Woods. Its total length is about 31 miles.
(See U. S. Geological Survey Map of Minnesota, scale 1:500,000.)
  Existing project.-This provides for dredging a channel 81/2 feet
deep and 75 feet wide for a distance of about 950 feet from the mouth
of the river, with ;an increase in width at the inner end, to form
a turning basin with a maximum width of 250 feet. The project
depth is referred to low-water datum at Baudette, which is taken
at 1,056 feet above mean tide level at New York. The ordinary
variation of water level during any one navigation season is 1.3 feet.
   The estimate of cost for new work, revised in 1919, was $5,000.
The latest (1919) approved estimate for annual maintenance is $800.
   The project was adopted by the River and Harbor Act of March 2,
1919 (H. Doc. No. 109, 63d Cong., 1st sess.). The latest published
map is in the project document.
   §Terminal facilities.-The village of Baudette has a timber wharf
about 41 feet long. There is also a privately owned timber wharf,
having a river frontage of about 54 feet. At Spooner there is a
village-owned timber wharf about 70 feet long. All these wharves
are open to the public without charge. In addition to the foregoing
there are several privately owned small and little-used wharves on
both sides of the river.
   Operations and results during fiscal year.-No work was done or
funds expended.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1919 at a saving of $475.32 under the estimated cost. The
available depth in the channel in May 1934 was 6.5 feet for a least
width of 75 feet at low-water datum (1056.0). The costs and ex-
  'Exclusive   of available funds.
                     RIVERS AND :IARBORS-DULUTH, MINN., DISTRICT                                                                     1025
penditures were $4,524.68 for new work and $12,542.13 for main-
tenance, a total of $17,066.81.
   Proposed operations.-The balance unexpended June 30, 1934,
$8,000, will be applied to maintenance dredging with U. S. pipe-line
dredge Traverse in July 1934. Funds will be exhausted by June 30,
1935.
   No work is contemplated during the fiscal year 1936; therefore no
funds can be profitably expended.
                                          Cost and financial summary
Cost of new work to June 30, 1934----__----------------------- $4, 524. 68
Cost of maintenance to June 30, 1934------------------------12, 542. 13
           Total cost of permanent work to June 30, 1934 ---------__                                                             17, 066. 81

Net total expenditures                 ------------------------------------                                                      17, 066. 81
Unexpended balance June 30, 1934__----------------                                                                                8, 000. 00
           Total amount appropriated to June 30, 1934--------------                                                              25, 066. 81

          Fiscal year ending June 30                        1930                1931                   1932           1933           1934


Cost   of new work------                --------             --------------------------------------------
Cost of maintenance----------__.....                __
                                                   ...       $39. 68         $8, 000. 00
Total expended---..--.........-------------------            39.68              , 000. 00--
Allotted........------------       -----------------      2, 766.81            5,000. 00----------------------                       8, 000. 00


Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934--    ----------------------------------------   $8, 000.00

Balance unexpended June 30, 1934--------------------------                                                                       8,000. 00
    12. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                                      (GENERAL)

   The cost of work during the year amounted to $36,698.97; the ex-
penditures were $36,128.02. The balance unexpended June 30, 1934,
$26,607.46, will be: applied as needed during the fiscal year 1935 to
payment of expenses incurred in connection with the above items.
The additional sum of $22,000 can be profitably expended during the
fiscal year ending June 30, 1936.
                                          Cost and financial-summary

Cost of maintenance to June 30, 1934__---   --------------         $154, 165. 93
Minus accounts payable June 30, 1934-------         --------------       741.43

     Net total expenditures-------------------        ----                                                                   153, 424. 50
Unexpended balance June 30, 1934--------------------------                                                                    26,607. 46

          Total amount appropriated to June 30, 1934--------------                                                           180, 031. 96

          Fiscal year ending June 30                       1930                1931                   1932           1933           1934

Cost ofnew work .------ ---------------- -----------                                                             I-
Cost of maintenance------------------- $12, 559. 62 $46, 390. 59                                $33, 603. 62      $22, 485. 61    $36, 698. 97
Total expended-----------............-----------         11, 821. 48        46, 061. 00           34, 540. 29      22, 495. 19     36, 128. 02
Allotted ..--
           _____._..-----.-----
                          ------------                   12, 400. 00        40, 000. 00           31, 009. 33      23, 130. 95     59, 291. 68
1026      REPORT OF CHIEF OF ENGINEERS, U.                       S. ARMY, 19 34

Balance unexpended July 1, 1933----------------------------                                 $3, 443. 80
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934---------------------$23, 000. 00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933---------------------- 37,000. 00
                                                                                               000. 00
                                                                                            6,0,
      Amount to be accounted for- --------     ____- ___--- --    63, 443. 80
Deductions on account of revocation, of allotment_---------------     708. 32

      Net amount to be accounted for ---------------              6---.735. 48
                                                                - 62,
Gross amount expended----________------              39, 993. 53
Less reimbursements collected----------------------   3, 865. 51
                                                                  36, 128. 02
      Balance unexpended June 30, 1934_.....___-.--------                                   26,607.46
Outstanding liabilities June 30, 1934_-----------------------                                  768. 67
       Balance available June 30, 1934----------___---__-                                   25. 838. 79

Amount that can be profitably expended in fiscal year ending June
30,  1936,
          for maintenance
                              -- - -- -- - - -- - -- - -- -- - -- - -- - -- - -- -
                                                                                   22, 000. 00

              13. Other projects for which no estimates are submitted
          [Commercial statistics for this project are given in pt. 2 of report]


                                                 For last   Cost and expenditures to
                                                 full re-         June 30, 1934              Estimated
                 Name of project                 port see                                    amount re-
                                                 annual                                       quired to
                                                 report     New work       Maintenance        complete
                                                  for-


Port Wing Harbor, Wis__----___------------------ 1932        $48, 355.23     $62, 436. 77         $8, 200

Channels adequate for commerce.

   IMPROVEMENT OF RIVERS AND HARBORS IN THE
           MILWAUKEE, WIS., DISTRICT
   This district includes the rivers and harbors in the States of
Michigan and Wisconsin on the west shore of Lake Michigan, con-
stituting the original Milwaukee district, and the harbors along the
east shore of Lake Michigan, in the State of Michigan, to the Straits
of Mackinac, and thence along the north shore to Seul Choix Point
Lighthouse, including the waters draining into this part of Lake
Michigan, constituting the former Grand Rapids, Mich., district.
   District engineer: Lt. Col. H. M. Trippe, Corps of Engineers.
   Division engineer: Col. Edward M. Markham, Corps of Engineers,
to October 18, 1933; Lt. Col. Max C. Tyler, Corps of Engineers, since
that date.
  1Exclusive   of available funds.
           RIVERS AND HARBORS--MILWAUKEE,            WIS.,   DISTRICT       1027
                                IMPROVEMENTS

                                  Page                                       Page
      Manistique Harbor, Mich__   1027    16. St. Joseph Harbor, Mich___     1074
      Menominee Harbor and                17. South Haven Harbor, Mich_      1077
        River, Mich. and Wis ..   1029    18. Saugatuck Harbor and Kal-
      Green Bay Harbor, Wis _..   1032         amazoo River, Mich _____      1079
      Fox River, Wis_             1037   19. Holland Harbor, Mich ____       1080
      Operating and care of locks        20. Grand Haven Harbor and
        and dams on Fox River,                 Grand River, Mich ......     1083
        Wis-                      1044   21. Muskegon Harbor, Mich__        1086
6.   Sturgeon Bay and Lake              22. White Lake Harbor, Mich__      1089
        Michigan Ship Canal, Wis_ 1045   23. Pentwater Harbor, Mich __      1091
7.   Algoma Harbor, Wis ......   1047   24. Ludington Harbor, Mich___      1093
8.   Kewaunee Harbor, Wis ___    1050   25. Manistee Harbor, Mich____      1095
9.   Two Rivers Harbor, Wis___ 1052     26. Portage Lake Harbor, Mich_     1098
10.   Manitowoe Harbor, Wis ...   1054   27. Frankfort Harbor, Mich___      1100
11.   Sheboygan Harbor, Wis__     1057   28. Charlevoix Harbor, Mich_-_     1102
12.   Port Washington Harbor,            29. Examinations, surveys, and
        Wis-                      1060         contingencies (general) __    1104
13.   Milwaukee Harbor, Wis -..   1064   30. Other projects for which no
14.   Racine Harbor, Wis _____    1070         estimates are submitted__     1105
15.   Kenosha Harbor, Wis _____ 1072

                      1. MANISTIQUE      HARBOR, MICH.

   Location.-This harbor is on the north shore of Lake Michigan,
about 135 miles northeasterly from Green Bay Harbor and 220
miles northerly from Milwaukee. (See U. S. Lake Survey Chart
No. 711.)
   Previous projects.-Adopted by River and Harbor Act of June 14,
1880. The cost and expenditures prior to commencement of work
under the existing project in 1905 were $3,955.05 for new work. For
further details see page 1933 of Annual Report for 1915.
   Existing project.-This provides for two breakwaters extending
from the shore on either side of the mouth of the Manistique River,
1,744 and 1,480 feet in length for the east and west breakwaters,
respectively, and for a channel 18 feet deep except where rock is
encountered at less depth. This channel extends from that depth in
the lake up the river a distance of 1,650 feet from its mouth, having
a total length of 3,200 feet from the outer end in the lake and
varies in width from 225 to 475 feet, the west side at the river
mouth being protected by a revetment 375 feet long. The break-
waters are formed of stone-filled piling and timber cribs, capped with
concrete superstructure; the revetment is formed of stone-filled
plank cribs.
   The project depth is referred to low-water datum for Lake Michi-
gan, which is taken at 578.5 feet above mean tide level at New York.
The fluctuations of water level are seasonal changes of about one-half
foot above or below the annual mean stage and extreme fluctuations
of a temporary nature, due to wind and barometric pressure, of about
11/2 feet above or below the mean lake level prevailing at the time.
   The estimate of cost for new work, revised in 1908, was $338,462,
exclusive of amounts expended on previous projects. The latest
(1917) approved estimate for annual cost of maintenance is $5,000.
The existing project was authorized by the following river and
harbor acts: The act of March 3, 1905, provided for the breakwaters
and outer harbor (H. Doc. No. 429, 58th Cong., 2d sess.). The
act of March 2, 1907, provided for the present location of the west
1028    REPORT OF CHIEF OF ENGINEERS,          U.   S.   ARMY,   1934

breakwater and the present channel dimensions (approved by the
Secretary of War Apr. 3, 1908, in an unpublished report of Mar.
13, 1908). For latest published map see Annual Report for 1908,
page 1942.
   Local cooperation.-Fully complied with.
   Termninal facilities.-Besides a car-ferry slip there are two coal
wharves, two fishing wharves, and numerous lumberyard slips.
While these facilities are considered fairly adequate for existing
commerce, it is believed that a wharf, with rail connection and
under public control, should be provided.
   Operations and results during fiscal year.-Operations consisted
of sweeping the entrance channel and removing boulders therefrom
at a cost of $3,468.48. Minor repairs to breakwater and piers cost
$1,458.52. All work was done by hired labor and use of Government
plant. The total cost was $4,927 for maintenance. The total net
expenditures were $6,017.58.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1917 at a saving of $31,210 under the estimated cost. The
breakwaters enclosing the basin and the dredging of the channel to
18 feet depth below low-water datum over practically all the area
below the car-ferry slip were completed in 1915. The channel above
the slip was dredged to ledge rock in 1917, thereby completing the
project. The plank crib revetment was completed in 1909. The
piers and breakwater are generally in good condition. The super-
structure of the plank crib revetment is in a very dilapidated con-
dition, but immediate repairs thereto are not considered necessary,
as it is not essential to the preservation of the harbor. The con-
trolling depth at low-water datum at the close of the fiscal year was
17.5 feet over practically the full width of the entrance channel up to
300 feet above the car-ferry slip. The controlling depth above this
point was 16.8 feet over a minimum width of about 50 feet along the
west revetment to the lumberyard slips. The channel varies in width
from about 275 feet at entrance between breakwaters to 475 feet in
the basin, narrowing again to about 225 feet above the car-ferry slip.
The costs of permanent work under the existing project are $307,-
252.18 for new work and $76,728.27 for maintenance, a total of
$383,980.45. The total expenditures are $384,694.93.
   Proposed operations.-The balance unexpended, $7,283.30, will be
applied to maintenance operation of U. S. hopper dredge Meade
9 days during July 1934.
    Dredging is required annually for maintenance of project dimen-
sions of channel. The additional sum of $5,500 can be profitably
expended during the fiscal year ending June 30, 1936, in maintenance
operation of U. S. hopper dredge Meade during summer 1935.
                        Cost and financial summary
Cost of new work to June 30, 1934_____________________________ $311, 207. 23
Cost of maintenance to June 30, 1934____                         76,728. 27
      Total cost of permanent work to June 30, 1934________-__ 387, 935. 50
Value of plant, materials, etc., on hand June 30, 1934_____ __       714.48
      Net total cost to June 30, 1934___                        388, 649. 98
Net total expenditures---  ---      --- ___     ---        ---  388, 649. 98
Unexpended balance June 30, 1934_---------                        7, 283. 30
      Total amount appropriated to June 30, 1934___---          395, 933. 28
                RIVERS AND HARBORS-MILWAUKEE,                                         WIS.,        DISTRICT           1029

           Fiscal year ending June 30                       1930         1931           1932          1933            1934


Cost of new work----
Cost of maintenance-------- ------------                    $676. 62     $540. 44    $5, 875.80     $9, 475. 22      $4, 927. 00

Total expended...-----          ------------------           676. 62      514. 70     5, 673. 98     9, 326. 68       6, 017. 58

Allotted ...................----------------------------   2, 500. 00   4, 500. 00   -4, 500. 00    15, 000. 00       7, 400. 00


Balance unexpended July 1, 1933_                                                                                  $5, 900. 88
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934     -------------------- $5, 500.00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933-----------------------      9, 000. 00
                                                                                                                  14, 500. 00

            Amount to be accounted for ________________-------__                                                  20, 400. 88
Deductions on account of revocation of allotment                                                                    ,100. 00
                                                                                                                   7______________
            Net amount to be accounted for __                           _____-__--   _______--13, 300. 88
Gross amount expended                                                        -     -   -,         017. 58
                                                                                                6__________________

            Balance unexpended June 30, 1934 _________________                                         __          7, 283. 30

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1     ___________________        ______                                                 5,500. 00
               2. MENOMINEE HARBOR AND RIVER, MICH. AND WIS.

    Location.-On the west shore of Green Bay, distant about 49 miles
northeasterly from Green Bay Harbor, and about 155 miles from
Milwaukee via Sturgeon Bay Canal. (See U. S. Lake Survey Chart
No. 723.)
    Previous projects.-Priorto 1902 the harbor and river constituted
two works.
    Harbor: River and Harbor Acts of March 3, 1871, September 19.
1890, and March 3, 1899; the amount expended was $200,471.67 for
-new work, $33,811.10 for maintenance, a total of $234,282.77.
    River: River and Harbor Acts of September 19, 1890, July 13,
1892, and June 3, 1896; the amount expended was $111,951.63 for new
work, $2,382.49 for maintenance, a total of $114,334.12.
    The cost and expenditures on harbor and river prior to commence-
ment of work under existing project in 1902 were $312,423.30 for
new work, $36,193.59 for maintenance, a total of $348,616.89. (For
further details see p. 1933 of Annual Report for 1915.)
    Existing proect.-This provides for protecting the mouth of the
river by parallel piers 400 feet apart about 1,870 feet and 2,681 feet
in length for the north and south piers, respectively, and for a
.channel 20 feet deep from that depth in the bay to the upper end of
the Marinette municipal wharf, about 4,700 feet above the, Ogden
Street Bridge, and 8,700 feet from the outer end in the bay where
the width is 600 feet, reducing to 300 feet between the piers and up
to Ogden Street Bridge, thence 200 feet in the river to the upper end
of the channel, with a turning basin 18 feet deep for 600-foot ves-
sels on south side of the channel just below the municipal wharf.
Except for 168 feet of concrete caissons at outer end of south pier,
    1 Exclusive of available funds.
1030   REPORT OF CHIEF OF ENGINEERS,         U. S.   ARMY,   1934

the piers are formed of stone-filled piling and timber cribs, the entire
north pier and 1,276 feet of the south pier having been repaired
with concrete superstructure and 801 feet of the south pier repaired
with rubble, superstructure.
    The project depths are referred to low-water datum for Lake
Michigan, which is taken at 578.5 feet above mean tide level at New
York. The fluctuations of water level are seasonal changes of about
one-half foot above or below the annual mean stage, and extreme
fluctuations of a temporary nature, due to wind and barometric pres-
sures, of about 11/2 feet above or below the mean lake level prevailing
at the time.
    The estimate of cost for new work, revised in 1930, was $106,800,
exclusive of amounts expended on previous projects. The latest
 (1930) approved estimate for annual cost of maintenance is $7,500.
    The existing project was authorized by the following river and
harbor acts: The act of March 3, 1871, provided for the entrance
piers (Annual Report for 1867, p. 132); the act of June 13, 1902,
consolidated the project for the harbor and river and authorized a
channel 18 feet deep (H. Doc. No. 419, 56th Cong., 1st sess.) ; the act
of March 4, 1913, partially restored the work above the bridge which
had been eliminated by the act of March 3, 1905, and the act of July
3, 1930, provided for the present dimensions of the channel and for
the turning basin (H. Doc. No. 171, 70th Cong., 1st sess.). The latest
published maps are in the last-mentioned document and in Rivers
and Harbors Committee Document No. 28, Seventy-third Congress,
second session.
    Recommended modifications of project.-Under date of January
25, 1934, the Chief of Engineers recommended modification of the
existing project to the extent of increasing the channel depth to 21
feet below the present low-water datum, and to enlarge the turning
basin and deepen it to 21 feet below datum, all at an estimated
cost of $83,000, with $2,500 for annual maintenance in addition to
that now authorized; provided that work on the turning basin shall
not be undertaken until local interests furnish without cost to the
United States the lands and/or easements required in connection with
its enlargement (Rivers and Harbors Committee Doc. No. 28, 73d
Cong., 2d sess.).
    Terminal facilities.-Besides a car-ferry slip, there are numerous
wharves for handling coal, building materials, and miscellaneous
commodities. The city of Marinette maintains a public wharf. The
facilities are considered fairly adequate for existing commerce, except
that there is need for a public wharf owned by the city of Menominee
with warehouse and railway connection.
    Operations and results during fiscal year.-Operations consisted
of dredging 63,000 cubic yards, by hired labor and use of Govern-
ment plant, for restoration of project depth at a cost of $12,018.86,
for maintenance. The total net expenditures were $11,924.76.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1931 at a saving of $27,327.41 under the estimated cost.
The entrance piers were completed in 1884 and the dredging in 1931.
The inner 654 feet of the north pier and 604 feet of the south pier
are no longer essential for the preservation of the channel, and these
piers are therefore maintained only for lengths of about 1,216 and
2,077 feet, respectively.
             RIVERS AND HARBORS-IMILWAUKEE,                                              WIS., DISTRICT                  1031
  The controlling depth at low-water datum at the close of the fiscal
year was 19 feet in the channel to the Marinette municipal wharf
and 18 feet in the turning basin. The river is available for rafting
and logging for about 102 miles above its mouth. The costs of
permanent work under the existing project are $79,472.59 for new
work and $261,261.84 for maintenance, a total of $340,734.43. The
total expenditures are $341,129.01.
  Proposed operations.--The balance unexpended will be applied as
follows :
Maintenance:
   Operation of U. S. dipper dredge Kewaunee, about August-Sep-
     tember 1934---------------------------------             ------ $14, 080. 17
   Riprap piers with United States plant, 1,000 tons, during the
      fiscal year  ------------------------------------------          2, 700. 00

            Total----               ---------------------------------------                                          16, 780. 17
   Dredging is required annually for maintenance of project dimen-
sions of channel. The additional sum of $13',500 can be profitably
expended during the fiscal year ending June 30, 1936, as follows:
Maintenance:
    Operation of U. S. dipper dredge Kewaunee, during summer 1935__ $10, 800
   Riprap piers, 1,000 tons, with United States plant, summer 1935__  2, 700

         Total------------------------                                     -----------------------                      13, 500
                                          Cost and financial summary

Cost of new work to June 30, 1934      __________--------------                                                 $391, 895. 89
Cost of maintenance to June 30, 1934 .____-         __--------------                                             297, 455. 43

      Total cost of permanent work to June 30, 1934__-__---                                                    689, 351.32
Value of plant, materials, etc., on hand June 30, 1934_----                                                 -____ 394. 58

         Net total cost to June 30, 1934 .____-__------------..                                                  689, 745.90

                                            --
Net total expenditures__ ______________________-_                                                                    89, 745. 90
Unexpended balance June 30, 1934   ________ -   -___                                                      __-        16, 780.17

         Total amount appropriated to June 30, 1934                                                  706, 526. 07
                                                                                             -________.---

        Fiscal year ending June 30                           1930           1931           1932          1933            1934


Cost of new work--_ --- ___----------I_-                                  $9, 715. 17   $24, 925. 12
Cost of maintenance           ...------------------      $17, 062. 94     13, 901. 18       728. 44    $9, 884. 37     $12, 018. 86
      Total cost..--       --------------------           17, 062. 94     23, 616. 35    25,653. 56     9, 884. 37      12, 018.86
Total expended_        _     _     ..---------------------- 13, 792. 58   18, 054. 68   34, 485. 59    10, 373. 05      11, 924. 76
Allotted_ ----.------------------------                   20, 000. 00     37, 000. 00 -----------       1, 800. 00      27, 250. 00


Balance unexpended July 1, 1933________-----------               $1, 454. 93
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934_________-___-_____      $10, 500.00
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933-------           __-----  17, 000.00
                                                                 27, 500. 00
         Amount to be accounted for-----------------------                                                           28, 954. 93
Deductions on account of revocation of allotment                                           -------                      250. 00
         Net amount to be accounted for------------------------ 28, 704. 93
1032     REPORT OF CHIEF OF ENGINEERS,             U. S. ARMY,    1934

Gross amount expended-------------------------           $11,925.76
Less reimbursements collected -----------------------          1. 00
                                                                        $11, 924. 76

       Balance unexpended June 30, 1934-----       ----------------- 16, 780. 17

Amount that can be profitably expended in fiscal year ending June 30,
  1936, for maintenance '----_--------_______13,                            500. 00

                         3. GREEN BAY HARBOR, WIS.

    Location.--Located at the mouth of the Fox River, at the head:
of Green Bay, distant about 180 miles from Milwaukee, Wis., via
Sturgeon Bay Canal, and about 49 miles southwesterly from Me-
nominee Harbor, Mich. and Wis. (See U. S. Lake Survey Chart
No. 725.)
    Previous projects.--Adopted by River and Harbor Act of June
23, 1866. This project was modified by subsequent river and harbor
acts as follows: June 23, 1874, July 13, 1892, and June 3, 1896. The
costs and expenditures thereunder prior to commencement of work
under the existing project in 1897 were $396,974.49 for new work,
 $8,918.19 for maintenance, a total of $405,892.68. For further de-
tails see page 1934 of Annual Report of 1915.
   Exis'ting project.-This provides for an outer channel in Green,
Bay about 7% miles long and 21 feet deep, from that depth in the
bay to the mouth of the river, varying in width from 500 feet at the
outer end to 200 feet at the river mouth, the portion through Grassy
Island, about 700 feet long, being protected by parallel timber revet-
ments 220 feet apart, the east one having concrete superstructure; for
an inner channel in the river about 31/2 miles long and 18 feet deep,
from that depth in the river at the southerly limits of the city of
Green Bay to De Pere, having a width of 150 feet; and for a turning
basin 18 feet deep at the upper end of the inner channel for turning
500-foot vessels.
    The project depths are referred to low-water datum for Lake
Michigan, which is taken at 578.5 feet above mean tide level at New
York. The fluctuations of water level are seasonal changes of about
one-half foot above or below the annual mean stage, and extreme-
fluctuations of a temporary nature, due to wind and barometric'
pressure, of about 21/2 feet above or below the mean level prevailing
at the time.
   The estimate of cost for new work on the outer channel, revised in
1927, was $625,600, and that for the inner channel and basin, re-
vised in 1925, was $121,500 (of which $50,000 was contributed by
local interests), both estimates being exclusive of amounts expended
on previous projects. The latest approved estimates for annual cost
of maintenance are for inner channel and turning basin (1925),.
 $5,000, and for outer channel and revetments at Grassy Island (1927),
 $18,000, a total of $23,000.
    The existing project was authorized by the following river and
harbor acts: The act of June 23, 1866, provided for the revetments
at Grassy Island (Annual Report for 1867, p. 70) ; the act of June 3,
1896, provided for a depth of 15 feet in the inner channel (unpub-
  .Exclusive of available funds.
        RIVERS AND HARBORS--MILWAUKEE,         WIS., DISTRICT    1033
lished report approved July 11, 1896); the act of June 13, 1902,
provided for a depth of 18 feet in the outer channel (H. Doc. No.
232, 56th Cong., 1st sess.); the act of June 25, 1910, provided for
the turning basin 15 feet deep (H. Doc. No. 522, 61st Cong., 2d
sess.); the act of August 8, 1917, provided that the improvement of
Green Bay Harbor should include the maintenance of the turning
basin at De Pere (H. Doc. No. 1017, 64th Cong., 1st sess.) ; the act of
March 3, 1925, provided for increasing depth of inner channel and
turning basin to 18 feet (H. Doc. No. 294, 68th Cong., 1st sess.) ; and
the act of January 21, 1927, provided for increasing depth of outer
channel to 21 feet (H. Doc. No. 585, 69th Cong., 2d sess.). For latest
published maps see House Documents Nos. 585, Sixty-ninth Congress,
second session; 294, Sixty-eighth Congress, first session; and 128,
Seventy-second Congress, first session; and Rivers and Harbors Com-
mittee Document No. 40, Seventy-second Congress, first session.
   Supplementing the work authorized by Congress, dredging the
outer channel to 22 feet below datum and widening it to 300 feet
from the bend at Tail Point to the river mouth, including widening
the bend outside of Tail Point and straightening the channel inside
of Grassy Island, as recommended by the Chief of Engineers in
Rivers and Harbors Committee Document No. 40, Seventy-second
Congress, first session, has been included in the Public Works pro-
gram under the National Industrial Recovery Act.
   Recommended modifications of project.-Under date of June 29,
1932, the Chief of Engineers recommended modification of the exist-
ing project so as to provide for the deepening of the outer channel
to 22 feet below datum and widening it to 300 feet from the bend at
Tail Point to the river mouth, including widening of the bend outside
of Tail Point Light, removal of the west timber revetment at Grassy
Island, and straightening from the inner end of that island to the
river mouth, at an estimated cost of $625,000, with $22,500 annually
for maintenance of the entire outer channel ($4,500 in addition to the
present estimated cost). Widening the channel in Fox River through
the city of Green Bay by the removal of shoals at the mouth of East
River and between the two upper railroad bridges to a depth of 22
feet below datum, at an estimated cost of $109,500, with about $1,000
annually for maintenance, subject to the provision that the city of
Green Bay shall contribute $20,000 toward the cost of work within
the city limits. (Rivers and Harbors Committee Doc. No. 40, 72d
Cong., 1st sess.). (Outer channel only included in Public Works
program.)
  Local cooperation.-Complied with.
  Terminal facilities.-There are 29 private wharves for the handling
of coal,' oil, lumber, grain, pulpwood, and package freight located on
this waterway. Green Bay has one municipal wharf open to the
public. These facilities are fairly adequate for existing commerce.
   Operations and results during fiscal year.-Operations conducted
with regular funds consisted of dredging 54,100 cubic yards, by hired
labor and use of Government plant, for restoration of project depth,
at a cost of $16,343.49 for maintenance. The total net expenditures
were $18,371.55.
  Operations conducted under authority of the Federal Emergency
Administration of Public Works consisted of entering into contract
1034     REPORT     OF CHIEF OF ENGINEERS,         U.    S.    ARMY,   1934

for dredging that portion of the outer channel in Green Bay outside
of Grassy Island. The total net expenditures were $3,660.61.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1931 at a saving of $79,813.09 under the estimated cost.
The project for the outer channel was completed in 1931. The
project for the inner channel and turning basin was completed in
1926. The west revetment at Grassy Island, built in 1870, is in fair
condition. The east revetment, built in 1869, has been provided
with concrete superstructure and is in good condition. The con-
trolling depth at low-water datum at the close of the fiscal year
was 20 feet in the outer channel and 17.5 feet in the inner channel,
including the turning basin at De Pere. The head of deep-water
navigation is at De Pere. The costs of permanent work under the
existing project are $617,286.91 for new work and $330,207.68 for
maintenance, a total of $947,494.59. The total expenditures are
$946,129.18, all from regular funds.
   Under authority of the Public Works Administration a contract
has been entered into for dredging that portion of the outer channel
in Green Bay outside of Grassy Island. The total expenditures are
$3,660.61.
   Proposed operations.-The balance unexpended, including ac-
counts receivable, will be applied as follows:
Accounts payable June 30, 1934-----    ----------------------     $1, 479. 91
Maintenance: Operation of U. S. dipper dredge Depere, about July-
November 1934 and June 1935------------------------------ 29, 028. 28

       Total ---------------------------------------------                30, 508.19
The unexpended funds from the National Industrial Recovery
Act will be applied as follows:
Accounts payable June 30, 1934__------------------------------ $314. 86
New work dredging about 75 percent of the outer channel to 22
  feet below datum by contract in force, July 1934-November
1936--------------------------------------------------- 621,024.53
       Total      -------------------      ------------------------ 621, 339. 39
  The project for deepening, widening, and straightening the outer
channel and removing shoals in the river in the city of Green Bay
should be completed as soon as funds are available. Dredging is re-
quired annually for maintenance of project dimensions of the inner
channel. The additional sum of $410,000 can be profitably expended
during the fiscal year ending June 30, 1936, as follows:
New work :
   Complete dredging the outer channel to 22 feet below datum by
    contract, September 1935-November 1936-----------------        $200, 000
   Widen channel of Fox River by removing shoals: between the
    2 upper railroad bridges by contract, September 1935-November
    1936 (exclusive of $20,000 to be contributed by the city of
    Green Bay) --------------------------            ----     ----  195, 000

          Total, new work----------------------------------                   395, 000
Maintenance: Operation of U. S. dipper dredge Depere, summer 1935
and spring 1936-------------------------------------------15,                    000
       Total new work and maintenance ..---.---    _--..---_                  410, 000
              RIVERS AND HARBORS-MILWAUKEE,                                      WIS., DISTRICT                        1035
                                        Cost and financial summary
                               MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934_ _-------____           __ ---                             ----          $1, 014, 261. 40
Cost of maintenance to June 30, 1934_.......--------------                                                     339, 125. 87
      Total cost of permanent work to June 30, 1934_- __....                                                1, 353, 387. 27
Plus accounts receivable June 30, 1934_.-..............--..                                                         114. 50
      Gross total costs to June 30, 1934--------------                                                      1, 353, 501. 77
Minus accounts payable June 30, 1934---------                                   ---.......                       1, 479.91
     Net total expenditures  -----------------------------
                               ....                                                                         1, 352, 021. 86
Unexpended balance June 30, 1934--------------------------                                                      30, 393. 69
         Total amount appropriated to June 30, 1934                          ------------                   1, 382, 415. 55

    Fiscal year ending June 30              1930             1931            1932                   1933           1934


Cost of new work_______
Cost of maintenance-......
                                 ____    $105, 995. 84    $117, 714. 90
                                             8, 837. 18 --.----
                                          -____
                                                                           $64, 244. 72 .         .____________--......
                                                                            11, 094. 05       $22, 771. 08     $16, 343. 49
       Total cost-. --________     __     114, 833.02      117, 714. 90     75, 338. 77         22, 771. 08        16, 343. 49
Total expended----......- --        _     100, 349. 82     101, 795. 86    109, 807. 10         17, 193. 43        18, 371. 55
Allotted...------................          40, 000. 00      37, 000. 00   -26, 000. 00          19, 812. 24        43, 050. 00


Balance unexpended July 1, 1933 --------------------------                                                      $5, 715. 24
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934 .---   ...--. -------          $25, 000. 00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933----------------------- 18, 500. 00
                                                                                                               43, 500. 00
      Amount to be accounted for--------           ---------- __- 49, 215.24
Deductions on account of revocation of allotment __ -----------       450. 00

      Net amount to be accounted for ------    -------------     48, 765. 24
Gross amount expended-----      -------------------- $21,214. 28
Less reimbursements collected   --------------------- 2, 842. 73
                                                                 18, 371. 55

      Balance unexpended June 30, 1934 -----------------          30, 393. 69
Outstanding liabilities June 30, 1934--------------------------1,     479. 91

      Balance available June 30, 1934------------------------28, 913. 78
Accounts receivable June 30, 1934_ ......... __....----          114. 50

         Unobligated balance available June 30, 1934------------                                               29, 028. 28

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1__-__-- ----    --------------                                                     15, 000. 00
                                            PUBsLI       WORKS FU DS
Cost of new work to June 30, 1934_____________      ___________    __
Cost of maintenance to June 30, 1934_.___________        ____---                                           -----
Value of plant, materials, etc., on hand June 30, 1934-------------- 3, 975. 47
                                     ....--
      Net total cost to June 30, 1934--     __....-------    - 3, 975.47
Minus accounts payable June 30, 1934---------------------------   314. 86

     Net total expenditures-----
                            ___----                                        ----------                           3, 660. 61
Unexpended balance June 30, 1934----------                                ----------------                    621, 339. 39
         Total amount appropriated to June 30, 1934                            ...--------------              625, 000. 00
  1 Exclusive of available funds.
1036             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                             1934


            Fiscal year ending June 30                     1930                1931                1932             1933              1934


Cost of new work .. - - - -                 - - -         - -      -      --    -     -       --    - -         - - - -           -
Cost of maintenance_  °                               -                   -
Total expended........----------........          ..----------------------------------------------                                $3, 660. 61
Allotted--------......-----------... . .    -------------------------------------
                                                          ...--                                                         ----- 625,000. 00


Amount allotted from National Industrial Recovery Act approved
  June 16, 1933--------------------------------------------- $625, 000. 00
Gross amount expended-    -----------------------    $3, 921.45
Less reimbursements collected-----------------------     260. 84
                                                                 3, 660. 61
     Balance unexpended June 30,. 1934                                                                                       6---------------------21,
                                                                                                                                   339..39
Amount covered by uncompleted contracts                                         -------------------                          457, 978. 80
            Balance available June 30, 1934-----------                                                                       163, 360. 59

Amount (estimated) required to be appropriated for completion
                                         - ---- --- -- -- - -- - -- -
of Public Works Administration project 1                             395, 000'. 00

Amount that can be profitably expended in fiscal year ending June
30, 1936, for new work -------------------------------------                                                                395, 000. 00

        CONSOLIDATED COST AND FINANCIAL SUMMARY FOR GREEN BAY HARBOR, WIS.

Cost of new work to June 30, 1934-___-11111111111111111         1 $1,014,261.40
Cost of maintenance to June 30, 1934 ---------------------           339, 125. 87
      Total cost of permanent work to June 30, 1934----------- 1, 353, 387. 27
Value of plant,, materials, etc., on hand June 30, 1934----------      3, 975. 47
      Net total cost to June 30, 1934-------------------------- 1,357, 362. 74
Plus accounts receivable June 30, 1934--------- ---------------           114. 50
      Gross total costs to June 30, 1934---------------------1, 357, 477. 24
Minus accounts payable June 30, 1934-------------------------          1, 794. 77
      Net total expenditures       ----------------------------- 1, 355, 682. 47
Unexpended balance June 30, 1934_-------------------------           651, 733. 08
      Total amount appropriated to June 30, 1934------------ 2, 007, 415. 55

    Fiscal year ending June 30.                1930                1931                    1932                 1933              1934


Cost of new work--..---..-...-----         $105, 995. 84      $117, 714. 90           $64, 244. 72        ----------
Cost of maintenance-------------
                         .                    8, 837. 18    ..-------------            11,094. 05           $22, 771. 08         $16, 343. 49

        Total cost__------ -------          114, 833. 02        117, 714. 90              75, 338. 77          22, 771.08         16, 343.49

Total expended.----------------             100, 349. 82        101, 795. 86          109, 807. 10             17, 193. 43        22, 032. 16
Allotted-...---....----------------          40, 000. 00          37, 000. 00         -26, 000. 00             19,812. 24        668, 050. 00


Balance unexpended July 1, 1933 ---------------------                                                          -----          $5, 715. 24
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934__-------------------     $25,                                                     000.00
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933--------------------------18,                                                       500. 00
Amount allotted from National Industrial Recovery Act
  approved June 16, 193..------------------- ------- 625,                                                      000. 00
                                                                                                                             668, 500. 00

           Amount to be accounted for----                                           ----------------                         674, 215. 24
Deductions on account of revocation of allotment-----                                                     --                       450. 00
           Net amount to be accounted for -------------                                                                      673, 765. 24
    1Exclusive         of available funds.
           RIVERS AND HARBORS-MILWAUKEE,                         WIS.,   DISTRICT        1037
rGrossamount expended_____________-----------------                  $25, 135. 73
Less reimbursements collected-        ------------                     3, 103. 57
                                                                                    $22, 032. 16

      Balance unexpended June 30, 1934             --------------------- 651, 733. 08
Outstanding liabilities June 30, 1934_ ---------------          $1, 479. 91
Amount covered by uncompleted contracts_-                -__-- 457, 978. 80
                                                                            459, 458. 71

      Balance available June 30, 1934------------------------192, 274. 37
Accounts receivable June 30, 1934-----------------------------    114. 50

         Unobligated balance available June 30, 1934_----------                     192,388. 87

Amount (estimated) required to be appropriated for completion of
Public Works Administration project 1______________-_           395, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1936 :
   For new work1-
   For maintenance '                            _______-----_
                       - - -- - -- - -- - -- -- - -- - -- - -- - -- - -- - -- - -- -

                              ____
                                                                                     395, 000. 00
                                                                                      15, 000. 00

         Total         -------------------------------------------                  410, 000. 00

                                   4. FOX RIVER, WIS.

    Location.-This river rises in Columbia County, Wis., and flows in
:a northerly direction into Green Bay. Its length is about 176 miles.
The Wolf River, physically the main river but by designation a
-tributary of the Fox, rises in the central part of Forest County, Wis.,
::and flows in a southerly direction about 220 miles into the Fox River
10 miles above Oshkosh. (See U. S. Lake Survey Chart No. 73.)
    Previous' projects.-As provided by special act of July 7, 1870,
and River and Harbor Act of June 10, 1872. The original project
was modified by the River and Harbor Act of March 3, 1873. The
,cost and expenditures thereunder prior to commencement of the
existing project in 1886 were $3,239,909.63 for new work, of which
 =$591,161.39 was spent solely on the Wisconsin River. The improve-
  ment of the Wisconsin River was abandoned in 1887 (Annual Report
  for 1887, p. 2096). (For further details see page 1940 of Annual
 .Report for 1915.)
    Existing project.-This provides for deepening and widening the
  channel of Fox River from De Pere, 7 miles above the mouth, to
  Portage, Wis., a total length of 156 miles, the depth between De Pere
:and Montello, 125 miles, to be 6 feet, with 9.6 feet in rock cut below
De Pere Lock and 7 feet in other rock cuts on the lower river below
 .Menasha Lock; and from Montello to Portage, 31 miles, the depth
  to be 4 feet; the width of channel from Lake Winnebago to Montello
  to be 100 feet, with necessary widening at bends; for the construction
  and reconstruction of 27 locks and 16 dams; for a concrete retaining
  wall at Kaukauna; for construction and maintenance of harbors
  having depths of 6 feet on Lake Winnebago; for widening Neenah
  Channel to 100 feet, with a 6-foot depth for a length of about 1 mile;
  and for dredging, snagging, and otherwise improving Wolf River
 :from its mouth to New London, a distance of 47 miles, the depth to
  be 4 feet. All depths are referred to standard low water.
  1Exclusive     of available funds.
1038       REPORT OF         CHIEF OF ENGINEERS,                            U.    S.    ARMY,     1934


  Ordinary and extreme fluctuations of water level above and below
mean stages on various parts of the improvement, due to floods and
other causes, are about as follows:

                                                                            Ordinary fluctua-     Extreme fluctua-
                                                                                  tions                tions
                          Place
                                                                            Above       Below     Above      Below
                                                                            mean        mean      mean       mean
                                                                            stage       stage      stage     stage

                                                                             Feet        Feet      Feet      Feet
Lower Fox River at De Pere Dam_.---.-------------------                        1.0         1.4       2. 5        4. 0
Lake Winnebago_          ----------------------------                            1. 2      1.3        2. 2       3. 7
Upper Fox River at Berlin Dam. __-__            _____--_-------        _         2. 7      1.4        5. 7       2. 0
W olf River at New London_    _......._   __        _
                                               .-_ .....   ... _.   __---        5. 0      2. 6       8. 8       3.0



   The estimated cost of new work, revised in 1928, was $1,398,000
for the upper river and $635,000 for the lower river; total, $2,033,000,
exclusive of amounts expended on previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $20,000
for the upper river if project dimensions are once fully obtained and
$110,000 for the lower river; total, $130,000.
   The existing project was authorized by the following river and
harbor acts: The act of August 5, 1886, provided for improvement of
the Fox River (plan of a board approved Dec. 10, 1884, as modified
by the Chief of Engineers May 14, 1886, Annual Report for 1885,
pp. 2041-2045); the act of September 19, 1890, provided for dredg-
ing Fond du Lac Harbor on Lake Winnebago (Annual Report for
1890, pp. 2389-2394); the act of June 3, 1896, provided for improve-
ment of the Wolf River (without prior survey or estimate) ; the acts
of June 3, 1896, June 13, 1902, and March 2, 1907, provided for im-
provement of Stockbridge, of Calumet and Miller Bay, and of Broth-
ertown Harbors, on Lake Winnebago (without prior surveys or esti-
mates); the act of March 3, 1925, provided for increasing the depths
in rock cuts on the lower river, for widening Neenah Channel, and
for concrete retaining wall at Kaukauna (H. Doc. No. 294, 68th
Cong., 1st. sess.). For latest published maps see House Document No.
146, Sixty-seventh Congress, second session, and House Document No.
294, Sixty-eighth Congress, first session.
                                                                                    Locks and dams, Fox River, Wis.


                                                                                                                                 Depth at
C,
C'~                                                   Dis-                                                                      normal pool
                                                     tance                                          Avail-                                                   Charac-
t0                                                                                                                                                            ter of            Kind of                                     Date of          Actual
                 Name of lock or dam                 from        Nearest town   tance   width        able              Lift                                                                         Type of construction comple-
                                                     Green                                          length                                                   founda-             dam                                          tion            cost
                                                                                                                               Breast        Lower             tion
r
                                                      Bay                                                                      wall 1        miter
                                                                                                                                              sill
CO                                              -I           1
                                                                                                   I*              I                     I    ~        I'                  I                   I'                           I - --   -I-
                                                     Miles                  Miles       Feet            Feet           Feet     Feet          Feet
        De Pere Lock 2____________________             7. 1 De Pere -...-                35. 8          144. 0          8.9       8. 1          9. 7  Rock______ Fixed                              Composite-...      .      1897         $14, 159. 39
        De Pere Dam 2                                  7. 2 ---do ----    -                                                                          ___do------Fixed 3 4__                                      - __
                                                                                                                                                                                                    Concrete .......          1929         209, 536.08
        Little Kaukauna Lock 2_                       13. 0 -----
                                                               do -    --
                                                                    ....        6        36. 6          137. 6         7. 2       8.0           7.4   Clay__-__ -...xe....                          Composite-.........       1896           8, 986. 52
    a   Little Kaukauna Dam 2_._                      13. 1      -----
                                                               do ....
                                                                    _ .         6                                                                      Clay and Fixed 4__               3           Piles and concrete___     1926         179, 397. 62
                                                                                                                                                        gravel.
        Rapidy Croche Lock 2_                     18. 9 Wrightstown__               2    36. 0          146. 0         8. 3      9.0            9.9   Rock _____                                 Concrete ___________
                                                                                                                                                                                                            .....      1933 a     (6)
        Rapid: Croche Dam 2_____________          19. 2     _.-
                                                             - do ......            2                                                                ___do ------     Fixed 3 4__                Concrete--...--....-  1930 118, 975. 40                   0
        Kaiukuna Fifth Lock 2____________         22.8   Kaukauna .-                     35.   6        144.   0        9. 1      6. 7          8.8 ___do ....--..........                       Composite    ........ 1898    13, 309. 90
        Kaukauna Fourth Lock 2-                   23. 1 ____do---- -                     36.   6        144.   1       10.2       6.9           6.0 __do------- ............                     Stone masonry-....    1879    37, 536. 37
        Kaukauna Third Lock 2_                    23. 2 .....
                                                          -    do .........
                                                               do---- ----               36.   6        144.   0       10.2       6.9           6. 3 ___do------- ............                  --..do-... -...        1879    39, 948.41
        Kaukauna Second Lock 2_____________       23. 4 ----- do                         35.   0        144.   0        9.6       6.0           6.0 _do
                                                                                                                                                     --      ------ ............                  .. do- ---
                                                                         -------                                                                                                                                       1903    24, 312. 77
        Kaukauna First Lock 2_______________      23. 6 ----- do---...                   35.   1        144.   4       11.0       6.9           6.0 ___-do------                                  _ do------..    -    1883    38, 703. 52
        Kaukauna Dam 2              -__ -_        24. 0 ----- do ..----                                                                                                        Fixed.   3 4_     Concrete- ..........1931     123, 763.41
        Kaukauna Guard Lock_______________        24.0                                   40.0
                                                                                        ---                                       9.4                        A--o---
                                                                                                                                                            ___do-------                                       1891                         12, 630. 30
        Little Chute Combined Lock, Lower 2.                                                                                                                                      Stone masonry -            .
                                                  25. 4 Little Chute_.              1    35. 4   146. 5                10.9       6.0           8.6                              ----- do --------------.      1879
        LittleChute Combined Lock, Upper 2_       25. 4    ...do--......            1    36. 3   144. 1                10.6       7.6           6.0    Hardpan-_                 ----- do--------------        1879                        102, 303. 82
        Little: Chute Second Lock 2 -             26.4                                   35. O0 144. 2                 13. 8      8.0           6.2    Rock_ .___                ----- do  --....--.......     1881                                        C
                                                                                                                                                                                                                                            48, 555. 36
                                                                                                                                                     ___do------ ------- - -
        Little Chute First (guard) Lock 2         26. 6 ___do  do---..--                        -...                                                                                  do--------------
                                                                  .......                35.4                                     6.6                                                                          1904                          7, 816. 56
        Little Chute Dam 2_______                 26. 6                                                                                              ___do------- Fixed 2 __ Concrete ______-                  1932                          82, 553. 74   td
        Cedars Lock2...
        Cedars Dam 2_- .
                             __-------
                              .
                                                  27. 3 .---- do -_,,-----
                                                  27.4 ---- do-._....
                                                                                    1
                                                                                    1
                                                                                         35. O0 144.0                  9.8        6.8           7.3 --
                                                                                                                                                     _do-------
                                                                                                                                                     __do--..----
                                                                                                                                                                    Fixed 3 4     Stone masonry-.
                                                                                                                                                                                  Concrete-_------- 1933
                                                                                                                                                                                                               1888                          34, 972. 19   M
                                                                                                                                                                                                                                             84, 872. 55
        Appleton Fourth Lock 2_____________       30. 7 Appleton-_,_.               1    35.0           144. 0          7.6       8. 1          7.9 __-do------                   Stone masonry -.             1907                          40, 892. 55
        Appleton Lower Dam 2_                     30. 9 --.. do......               1                                                                ___do-_-----   ---xed..3 4.
                                                                                                                                                                    Fixed         Timbers cribs 9-..           1889                          23, 456. 98
        Appleton Third Lock 2___.___ .__          31. 3 ---..  do--......                35. 0          144. 0          8. 7      6.0           8.6   - do-----                   Stone masonry-.....          1900                          32, 238. 39       2
        Appleton Second Lock 2_____________       31. 6 -.... do---- ---                  35. 1         144. 6          9. 6      6.9           6.0    Clay .-- -. Fixed 3 __ ...----  do...---_...---------   1901                        7 22, 939. 54
        Appleton First Lock 2_______________      31.9 ----- do---- ---                   35. 0         144. 7         10. 0      6. 6          6.0   Rock __   ---              ..... do-------------         1884                          36, 004. 48
        Appleton Upper Dam                        32. 2 --
                                           ._____________      do ....                                                                               ___do....--                   . do _._-___                1874                          60, 480. 69   t
        Menasha Lock 2 ____________________.      37. 0 Menasha---- -                    35.4           144. 0         8. 5       7.2           8.0 Clay_...                      Composite           _____    1899                        7 19, 326. 46
        Menasha Dam 2           _                 37. 8 _-_-_ do ........                                                                             Hardpan-. Fixed 3 ___ Timber cribs___--__                1887                          23, 553. 84
        Eureka Lock________________________                                                                                                                                                                                                                H
                                                  80. 9 Eureka -.. -                2    35. 7          148. 6         2.0        7. 9         10. 1 Sand...,-- ----.......       Stone masonry- --.-1876                                    51, 127. 51
                                                                                                                                                                                                                                                           H
            1 Depth shown is on breast wall, which is controlling depth for upper pool.
            2 Original structure built prior to assumption of control by the United States on Sept. 18, 1872.
            3 Provided with sluices.
            4 Flush boards used.
            5 Complete except for backfilling and old lock removal.
            6 Work incomplete.                                                                                                                                                                                                                             I.
            7 Partially rebuilt.                                                                                                                                                                                                                           06
           o Being rebuilt of con crete.
                                                                Looks and Dams, Foa River, Wis.-Continued
                                                                                                                                                                                                                            i.

                                                                                                                       Depth at
                                         Dis-                                                                         normal pool        Charac-
                                        tance                            Dis-    Clear
                                                                                                Avail-                                    ter of           Kind of                               Date of      Actual
        Name of lock or dam             from       Nearest town                                   able        Lift                       founda-            dam            Type of construction comple-
                                        Green                           tance    width          length               Breast    Lower       tion                                                   tion         cost         0
                                         Bay                                                                         wall 1    miter
                                                                                                                                sill
                                                                                                                                                                                                                            O
                                                                              I---"--------"------
                                                                            I--       ---      --                                              I     --        I--"""""-

                                                                                                                                                                                                                            0
                                        Miles                   Miles              Feet              Feet     Feet    Feet      Feet
Eureka Dam        _----------------      80. 9 Eureka- ... __       2                                                                   Earth -...        Fixed 3 ..   Timber and plank__             1877   $10, 276.15
Berlin Lock_____________------------     89. 2 Berlin ___...__      2                 34. 8       148. 6       1.3      7.4      9.2     Clay .....                    Stone masonry .-..             1878    44, 370. 98   CL
Berlin Dam_ _.-------------------        89. 2          . . .       2                           -do                                      Earth_____ Fixed        4.__. Timber cribs.-_-..             1894    14, 747. 14
White River Lock_____________---         99. 2 Princeton ....       6                34. 5           148. 5   1. 9      7.2     10. 7    Clay .--                      Stone masonry --...            1878    58, 709. 94
White River Dam_______________           99. 2 ----- do .......     6                                                                    Earth __--  Fixed       4...  Timber cribs..----__           1895    17, 285. 64
Princeton Lock___________----           108. 6 - .do                3                 34. 9       148. 4
                                                                                                ____----_      1.5      7. 3     9. 5    Sand ----.                    Stone masonry             -----1878
                                                                                                                                                                                                      1898
                                                                                                                                                                                                              51, 577.84
                                                                                                                                                                                                              11, 265. 69
Princeton Dam __---------------         108. 6    ----   do-        3
                                                               -=----                                                                   __do --      Fixed       4     Timber cribs__....
Grand River Lock_                       129. 3 Montello ____-       3                 34. 7          148. 3    1.4      6.4      9. 8    Clay ____   Fixed             Stone masonry -----
                                                                                                                                                                 4 __ Timber                          1878    56, 989. 43
Grand River Dam ..                      129. 3 -. . do . . .        3                                                                    Clay and                             cribs .......           1898     8, 446. 86
                                                                                                                                           sand.
Montello Lock 2___________________ 132.       6   -..- do _..                        35.3            137. 0   3.8       4.8      5. 7    Sand______                         Composite --------.       1901   7 4, 889. 83
Montello Dam     ___________       132.       6   ---- do .......                                                                        ___do ..--  Fixed.       -         Timber cribs ------- 1933  7 6, 772. 55
Governor Bend; Lock 2              156.       7    Portage --..             6        35. 0           137. 0   3.8     8 7.0      5.2    ___do ....                         --___do ____--        1931 7 30, 825. 38
Governor Bend Dam 2________________156.       7   ----. do ------           6                                                           ___do . . Fixed           -...     .-- do ___-------..    .   1865     (7, 9)
Fort Winnebago Lock 2 ___- _       160.       9   ..- do .    . .           2        34. 3           137. 0   6.4       5.8      5. 6    Clay _____
                                                                                                                                                    -- - --       --       Composite_ -               1890    12,088. 45
Portage Lock 2                     163.       1   --.- do .......                    35. 2           146. 0   2. 3     10. 5     8. 2    Sand .....                        Concrete -_______-.        1928   179, 604. 83

    1 Depth shown is on breast wall, which is controlling depth for upper pool.
    2 Original structure built prior to assumption of control by the United States on Sept. 18, 1872.
    3 Provided with sluices.
    4 Flush boards used.                                                                                                                                                                                                    ?J
    7 Partially rebuilt.
    8 Depth shown is on upper miter sill, which is controlling depth.
    9 Unknown.
        RIVERS AND HARBORS-MILWAUJKEE,           WIS., DISTRICT    1041

     Terminal facilities.-The wharf and landing facilities are in gen-
=eral adequate for the accommodation of existing commerce.
  .. Operations and results during fiscal year.-Operations consisted
of completing, by contract, the work of building a new concrete dam
and removal of old timber crib dam at Cedars (Kimberly), which
was in progress at the close of the previous fiscal year, at a cost
of $68,842.42. Construction of a new- concrete dam and removal
of old timber crib dam at Appleton (lower), by contract, was com-
menced at a cost of $8,902.64. The construction of a new concrete
lock at Rapide Croche, which was in progress at the close of the
previous fiscal year, was completed, except for backfilling and old
lock removal, by hired labor and use of Government plant. The
left lock wall, including upper and lower wing walls, platform,
miter-sills, installation of gates, etc., were completed at a cost of
$94,444.44. Dredging 102,428 cubic yards, by Government plant,
for restoration of project depth below Little Kaukauna lock, above
and below old Rapide Croche lock, below Appleton third and fourth
locks and at Calumet Harbor on Lake Winnebago, and removing
snags and shoals from Wolf River at various places, cost $43,444.18.
The total cost was $215,633.68 for maintenance. The total net ex-
penditures were $184,852.18.
     Condition at end of fiscal year.-The existing project is about 44
percent completed (upper river, 25 percent; lower, 83 percent).
Twenty-two original locks and 9 original dams have been rebuilt;
5 additional locks and dams have been built by the United States.
 (See existing project for year of completion of each.) The struc-
tures and the dredging in pools have increased the original depths
generally about 2 feet. The controlling depths at mean low water
at the close of the fiscal year were as follows:
Fox River:                                                           Feet
    De Pere to Eureka Lock ------------------------------------------ 6. O0
    Eureka Lock to 3 miles above Berlin Lock _-_-                     4.5
    3 miles above Berlin Lock to Montello Lock----------------------- 3. 5
    Montello Lock to Governor Bend Lock----------------------------   2. 5
    Governor Bend Lock to Portage Lock-----------------------------   2. 0
Wolf River:
    Mouth to 1 mile below Partridge Crop Lake------------------------4. 0
    1 mile below Partridge Crop Lake to New London------------------ 2. 5
Harbors on Lake Winnebago-----------------------------------------5.     5
  The practicable drafts of vessels is about one-half foot less than
the controlling depths and prevail throughout the year except when
the rivers are frozen, usually from December 1 to April 1. The head
of navigation for boat traffic is New London on the Wolf River and
Portage on the upper Fox, except that during high water on the
Wisconsin River boats can proceed from Portage to the Mississippi
River. The work remaining to be done to complete the project is
dredging in the upper Fox River and the upper portion of the Wolf
River; also rock removal and deepening Neenah Channel on lower
Fox River. Deepening Neenah Channel is no longer desired by
navigation interests. The remaining rock removal is not needed
unless there is a material increase in commerce. Additional dredg-
ing on the upper river is no longer considered necessary and is not
1042        REPORT OF            CHIEF OF ENGINEERS, U. S. ARMY, 1934

justifiable from an economic standpoint.                              The total costs of perma-
nent work under the existing project to June 30, 1934, are as follows:

                             Section                                 New work       Maintenance           Total


Upper river--.....-----          --------------------------------- $358, 295. 80     $225, 045. 22       $583, 341. 02
Lower river----------------------------------------                 513, 428. 21    1, 063, 566. 43     1, 576, 994. 64
      Total_------------------         _         ---------------     871, 724. 01   1, 288, 611. 65    2, 160, 335. 66.



  The total expenditures have been as follows: Upper river, $583,-
341.02; lower river, $1,926,461.29; total, $2,509,802.31.
  Proposed operations.-Thebalance unexpended, including accounts
receivable, will be applied as follows:
Accounts payable June 30, 1934            -----------------------------    $16, 223. 86
Maintenance:
    Operation of U. S. dipper dredge Depere, summer and fall,
      1934, and spring, 1935---- __-----__                         ____
                                                               -------  __   7, 000. 00
    Operation of U. S. bucket dredge Winneconne, summer and fall,
      1934, and spring, 1935--------------------------------18, 400. 35
    Complete reconstruction of Appleton lower dam, by contract in
      force, July-November 1934 (including materials furnished by
      the United States)   -----------------------------------              69, 000. 00
    Commence reconstruction of Depere Lock, by hired labor, De-
      cember 1934-March 1935-----------------                               80, 000. 00
    Construction of two steel-bottom dump scows, about 250-cubic
      yard capacity, by contract, winter 1934-35----------------_ 35, 000. 00

         Total--       ------------------------------------------                                     225, 624.21
   The old timber-crib dam at Menasha is badly decayed and has
inadequate flood-discharge capacity for the proper regulation of
Lake Winnebago. It should be rebuilt as soon as funds are avail-
able. The work of rebuilding the old timber-lined lock at Depere
should be continued during the winter of 1935-36 to the extent of
building the second portion in concrete. Dredging is required an-
nually for maintenance of project dimensions of channels. The
additional sum of $213,000 can be profitably expended during the
fiscal year ending June 30, 1936, as follows:
Maintenance:
    Operation of U. S. dipper dredge Depere, summer and fall, 1935,
      and spring, 1936------               ------------------       $16, 000
   Operation of U. S. bucket dredge Winneconne, summer and fall,
      1935, and spring, 1936--------           -----------               000
                                                                     1---------------9,
   Reconstruction of Menasha Dam, 300 linear feet, at $310, by con-
      tract or with United States plant, during summer and fall
      of 1935 ----------      --------------------------------       93, 000
   Reconstruction of about one-third of Depere Lock, with United
      States plant, December 1935-March 1936------------------- 85, 000

            Total---------------------------------------------213,                                                000
                                   Cost and financial summary

Cost of new work to June 30, 1934__-----------------------    $4, 111, 633. 64
Cost of maintenance to June 30, 1934-----------------------1,288,611.65
         Total cost of permanent work to June 30, 1934- -                                    ...- 5, 400, 245. 29

   1 Includes $591,161.39 expended on Wisconsin River.
               RIVERS AND HIARBORS-MILWAUKEE,                                 WIS., DISTRICT                 1043
Value of plant, materials, etc., on hand June 30, 1934 __________                                  $363, 746. 44
       Net total cost to June 30, 1934 _____.....______     -                                     5, 763, 991. 73
:Plus accounts receivable June 30, 1934-__--------------___                                            1, 944. 07
     Gross total costs to June 30, 1934--------------------5,                                          765, 935. 80
Minus accounts payable June 30, 1934_..-- __ -------------                                              16, 223. 86
      Net total expenditures-___---- -----------------                                            5, 749, 711. 94
iUnexpended balance June 30, 1934--------------------------                                          223, 680. 14

           Total amount appropriated to June 30, 1934_.............                               5, 973, 392. 08

   Fiscal year ending June 30             1930            1931            1932            1933              1934

Cost of new work----------------        $24,160. 13 ........................................
,Cost   of maintenance---------....--   144, 079. 13   $150, 858. 62   $139, 576. 46   $222, 083. 27      $215, 633. 68
        Total cost-..--------------168, 239. 26         150, 858. 62    139, 576. 46    222, 083. 27       215, 633. 68
'Total expended---------------          122, 989. 46    144, 215. 38    122, 716. 21    229, 213. 73       184, 852. 18
Allotted------ ---------------           91, 000. 00    151, 000. 00     80,000. 00     226, 784. 84       308, 000. 00


Balance unexpended July 1, 1933_                             _---___________--
                                                            ___     $100, 532. 32
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934 ________________
                               --                    $96, 000. 00
Amount allotted from War Department Appropriation
  Act approved July 14, 1932_________________      _ 105, 000. 00
Amount allotted from Emergency Relief and Con-
  struction Act approved July 21, 1932____________     6, 000. 00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933__      -- __________ __ 65, 000. 00
Amount allotted from War Department Appropriation
Act approved May 28, 1930 -- __       ---------      40, 000. 00
                                                                     312, 000. 00

      Amount to be accounted for_ ....-- __--- -------- __                                             412, 532. 32
Deductions on account of revocation of allotment------- ---                                              4, 000. 00

         Net amount to be accounted for- .---.-------                                                   408, 532. 32
'Gross amount expended-----------------------                $229, 642. 33
 :Less :
      Reimbursements collected----------$44, 714. 56
      Receipts from sales -----------------           75. 59
                                                               44, 790. 15
                                                                                                        184, 852. 18

     Balance unexpended June 30, 1934___________--_-_-_                                                 223, 680. 14
           liabilities June 30, 1934_______--_- -
-Outstanding                                      - $12, 455.34
Amount covered by uncompleted contracts---------- 73. 033.72
                                                                                                         85, 489. 06

      Balance available June 30, 1934 .                           __---------------        --          138, 191.08
-Accounts receivable June 30, 1934---                                                                     , 944. 07
                                                                                                         1------------------------

           Unobligated balance available June 30, 1934__--------                                        140, 135. 15

Amount (estimated) required     to be appropriated for completion
                       -- -- - -- - -- - -- -- - -- - -- - -- -- - -- - -- --
of existing project _____________________                                    1, 161, 300.00

Amount that can be profitably expended in fiscal year ending
June 30, 1936, for maintenance 1------------------------------                                        $213, 000. 00

   1 Exclusive of available funds.
1044       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                   1934

5. OPERATING AND CARE OF LOCKS AND DAMS ON FOX RIVER, WIS.

  The improvement forms part of the project for Fox River, Wis.
See page 1037, where general information regarding the improve-
ment can be found. The completed locks and dams have been
operated and maintained under the permanent indefinite appropria-
tions since 1885.
   Operationsand results during fiscal year.-Operationsconsisted of
making necessary repairs to locks, dams, canal banks, and lock houses
at a cost of $44,396.91. The locks and dams were operated in accord-
ance with the existing project and gages were read at a cost of
$34,884.80. All work was done by hired labor and use of Govern-
ment plant. The total cost was $79,281.71. The total net expendi-
tures were $86,659.49.
   Condition at end of fiscal year (see report on Fox River, Wis., p.
1037).-The total costs of permanent work from the indefinite appro-
priations are $3,684,359.67. The total expenditures are $3,681,912.68.
   Proposed operations.-The locks and dams will be operated and
maintained under allotments from the permanent indefinite appro-
priation provided by section 6 of the River and Harbor Act of March
3, 1909.
                                   Cost cand financial summary
Cost of maintenance to June 30, 1934                             $----------------------
                                                                 $3, 684, 359. 67
Value of plant, materials, etc., on hand June 30, 1934----------        3, 279. 84

      Net total cost to June 30, 1934----------------------3, 687, 639. 51
Plus accounts receivable June 30, 1934------------------------     349. 46

     Gross total costs to June 30, 1934_____________                                     ___-----       3, 687, 988. 97
Minus accounts payable June 30, 1934___                                                                         076. 29
                                                                                                             6_________----__--6,

     Net total expenditures-------------------------                                                    3, 681, 912. 68
Unexpended balance June 30, 1934--                                                                          23, 685.82

        Total amount appronriated to June 30, 1934------------3, 705, 598. 50

   Fiscal year ending June 30          1930                   1931             1932             1933            1934


Cost of new w ork-----------------      -    -      -     -      -   -
Cost of maintenance- .---.------  $132, 599. 11         $115, 187. 42    $109, 135.22        $84,815. 14       $79, 281. 71
Total expended------------------      86, 790. 74        115, 537. 24     108, 423. 08        80, 039. 70       86, 659. 49
Allotted------------------------     95, 000. 00         103, 000. 00     110, 000. 00        93, 056. 94       85, 900. 00


Balance unexpended July 1, 1933---------------------------- $24, 445. 31
Amount allotted from permanent indefinite appropriation, sec. 6,
  River and Harbor Act, Mar. 3, 1909___-----------------------   92, 000. 00
     Amount to be accounted for_ .. ___..___...._______       -                                             116, 445. 31
Deductions on account of revocation of allotment-----_------__                                                6, 100. 00

      Net amount to be accounted for ------------------------ 110, 345. 31
Gross amount expended--------------------------$88, 037. 81
Less reimbursements collected ---------------------- 1, 378. 32
                                                                86, 659. 49
         Balance unexpended June 30, 1934_                           -------                                 23, 685. 82
        RIVERS AND HARBORS-MILWAUKEE,              WIS., DISTRICT           1045
Outstanding liabilities June 30, 1934-----------------   $6, 076. 29
Amount covered by uncompleted contracts _____ ____        2, 958. 99,
                                                                        $9, 035. 28
     Balance available June 30, 1934------------------------14, 650. 54
Accounts receivable June 30, 1934___________________________-   349. 46
      Unobligated balance available June 30, 1934--------------15, 000. 00

     6. STURGEON BAY AND LAKE MICHIGAN SHIP CANAL, WIS.

  Location.-This improvement is on the west shore of Lake Michi-
gan, distant about 52 miles northeasterly from Green Bay and about
128 miles northerly from Milwaukee. (See U. S. Lake Survey Chart
No. 728.)
  Previous projects.-Adopted by act of March 3, 1873, modified by
act of June 14, 1880. The United States assumed possession of the
canal April 25, 1893, as provided by the River and Harbor Act of
July 13, 1892. The original project for the canal was adopted by
the River and Harbor Act of August 18, 1894, modified by River and
Harbor Act of June 3, 1896. The cost and expenditures thereunder
prior to commencement of the existing project in 1903 are as follows:
New work, including purchase price of canal, $323,419.40; mainte-
nance, $30,410.21; a total of $353,829.61. For further details see page
1935 of, Annual Report for 1915.
   Existing project.-This provides for an outer harbor or stilling
basin protected by two converging breakwaters, each 1,344 feet in
length, extending from the shore on either side of the easterly or
Lake Michigan end of the canal; for a channel extending from deep
water in the lake to the canal entrance at the shore line, a total
length of 1,300 feet, varying in width from 600 feet at the outer end
in the lake to 120 feet at canal entrance; for a revetted canal 7,200
feet in length, varying in width from 160 to 250 feet; for a channel
through Sturgeon Bay from the westerly end of the canal to deep
water in the bay, a distance of 4 miles, having a width of 200 feet;
and for a turning basin 1,600 feet long, maximum width 500 feet,
located at the westerly end of the canal at the head of Sturgeon Bay ;
all channels and the turning basin to be 19 feet deep. The break-
waters are formed of stone-filled piling and timber cribs and have
been provided with concrete superstructure; the revetments are
formed of piling and timber, 914 feet having been repaired with
concrete superstructure.
   The project depth is referred to low-water datum for Lake Michi-
gan, which is taken at 578.5 feet above mean tide level at New
York. The fluctuations of water level are seasonal changes of about
one-half foot above or below the annual mean stage, and extreme
fluctuations of a temporary nature, due to wind and barometric
pressure, of about 11/2 feet above or below the mean lake level
prevailing at the time.
   The estimate of cost for new work, revised in 1919, was $251,000,
exclusive of amounts expended on previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $20,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1873, provided for the breakwaters
 (Annual Report for 1874, pt. 1, p. 142); the act of June 13, 1902,
provided for the present canal revetments and channel dimensions
1046     REPORT      OF   CHIEF OF ENGINEERS, U.              S.   ARMY,    1934


and consolidated the canal and harbor works (H. Doc. No. 117, 56th
Cong., 2d sess.); and the act of March 2, 1919, provided for the
turning basin (H. Doc. No. 1382, 62d Cong., 3d sess.). The latest
published map is in the last-mentioned document.
   Terminal facilities.-As the canal and connecting channel is a
through waterway, the only terminal facilities are in the city of
Sturgeon Bay, 4 miles from the west end of the revetted portion of
the canal. These facilities consist of 3 small coal wharves, 2 ship-
building yards, and 1 package-freight wharf. There is also a large
stone wharf located about 5 miles northwesterly from the city of
Sturgeon Bay.
    Operations and results during fiscal year.-Operations consisted
of dredging 105,649 cubic yards for restoration of project depth at
a cost of $20,144.20. Minor repairs to revetments, including the
rebuilding of 400 linear feet of north revetment, cost $19,275.10. All
work was done by hired labor and use of Government plant. The
total cost was $39,419.30 for maintenance. The total net expenditures
were $39,675.19.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1919 at a saving of $7,777 under the estimated cost. The
harbor entrance piers were completed in 1880, the canal revetments
in' 1903, and the dredging in 1904. Pile revetments require repairs
and backfilling. About 260 feet of south plank crib revetment is in
fair condition but will require rebuilding above the water surface in
a few years. The controlling depth at low-water datum at the close
of the fiscal year was 18.5 feet over a minimum width of about 100
feet in midchannel through the outer harbor and over the full width
throughout the revetted canal. The entire channel through the outer
harbor and revetted canal has been swept and all loose stone removed
to project depth and more where there is greater depth to ledge rock.
There is a controlling depth of 19 feet over a width of 100 feet in
the channel west of the revetted canal. The costs of permanent work
under the existing project are $243,223.05 for new work and $427,-
821.89 for maintenance, a total of $671,044.94. The total expendi-
tures are $671,908.64.
   Proposed operations.-The balance unexpended, including ac-
counts receivable, will be applied as follows:
Accounts payable June 30, 1934--------------------------------                       $49.   22
Maintenance:
    Operation of U. S. hopper dredge Meade, July 1934, and June
      1935----------------------------------------------                          7, 000.   00
    Operation of U. S. dipper dredge Kewaunee, September-No-
      vember 1934----                ----------------------          -------     25, 387.   21
    Miscellaneous repairs to revetments and backfilling by hired
      labor during the fiscal year                  ---------------------------- 10, 000.   00
       Total ---------------------   ----------------     42, 436. 43
   Dredging is required annually for maintenance of project dimen-
sions of channel. The additional sum of $25,000 can be profitably
expended during the fiscal year ending June 30, 1936, as follows:
Maintenance :
   Operation of U. S. hopper dredge Meade, July 1935--------------                    $6, 000
     Operation of U. S. dipper dredge Kewaunee, fall 1935----------                   13, 500
     Minor repairs to revetments with United States plant, fall 1935            ...    5, 500
       Total_ _-------------------                                                    25, 000
                   RIVERS AND HARBORS-MILWAUKEE,                                         WIS., DISTRICT                   1047
                                                    Cost and financial summary

Cost of new work to June 30, 1934-------    --- __-__   ------                                               $566, 642. 45
Cost of maintenance to June 30, 1934_ .. _________-------.                                                    458, 232. 10

      Total cost of permanent work to June 30, 1934---------                                                1,024, 874. 55
Value of plant, materials, etc., on hand June 30, 1934 --------                                                  - 904. 70

      Net total cost to June 30, 1934_ ------------------                                                   1, 025, 779. 25
Plus accounts receivable June 30, 1934 -----------------------                                                        8. 22

     Gross total costs to June 30, 1934_-_____-                                        ___------            1, 025, 787. 47
Minus accounts payable June 30, 1934    ______                                       ___----        __         -   -49. 22

     Net total expenditures_____----__-_--___          1, 025, 738. 25
Unexpended balance June 30, 1934___   ________-----------42, 428. 21

             Total amount appropriated to June 30, 1934-----------                                          1, 068, 166. 46

     Fiscal year ending June 30                        1930           1931           1932           1933                1934


Cost of new work----------....                -------------------------------------------------------
Cost of maintenance------------.............         $44, 636. 89   $30, 814. 63   $83, 387. 51    $3, 108. 43         $39, 419. 30

Total expended----------------..................      44, 634. 46    31, 842. 10    82, 701. 69     3, 377. 02          39, 675. 19
Allotted-....--------------------                     16,000. 00    100, 000. 00   -3, 000. 00      1, 300. 00          72, 500. 00


Balance unexpended July 1, 1933 ---------       ___----------      -     $9, 603.40
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934- ---.-------.---------- $39, 000. 00
Amount allotted from War Department Appropriation
Act approved July 14, 1932-----__-------------         -     6, 000. 00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933---------------------              28, 000. 00
                                                                         73, 000. 00
      Amount to be accounted for-.__......             --                                                            82, 603.40
Deductions on account of revocation of allotment ------------                                                    -       500. 00

      Net amount to be accounted for----     ----------           _ 82, 103.40
Gross amount expended___________________________        $40, 639.79
Less reimbursements collected_-           _____-------- 964. 60
                                       -____
                                                                    39, 675. 19

      Balance unexpended June 30, 1934_________________________42, 428. 21
Outstanding liabilities June 30, 1934_ .. __---..... __       ----  49. 22

     Balance available June 30, 1934 _______-    __--..-___                                                          42, 378. 99
Accounts receivable June 30, 1934_  - -----   __        -----------                                        ___         -8. 22

            Unobligated balance available June 30, 1934_.................                                            42, 387. 21
Amount that can be profitably expended in fiscal year ending June
                              - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -
30, 1936, for maintenance                                                          25, 000.00

                                                   7. ALGOMA HARBOR, WIS.

  Location.--Algoma Harbor is on the west shore of Lake Michigan,
distant about 68 miles from Green Bay via Sturgeon Bay Canal and
about 115 miles northerly from Milwaukee. (See U. S. Lake Survey
Chart No. 72.)
   1Exclusive of available funds.
1048   REPORT    OF CHIEF OF ENGINEERS,       U.   S.   ARMY,   1934

   Previous projects.-Adopted by the River and Harbor Act of
March 3, 1871. The project was modified by subsequent River and
Harbor Acts as follows: March 3, 1873; March 3, 1875; July 5, 1884;
March 3, 1899. The cost and expenditures thereunder prior to the
commencement of the existing project in 1907 were $192,773.50 for
new work, $8,687.96 for maintenance,'a total of $201,461.46. (For
further details see p. 1935 of Annual Report of 1915.)
   Existing project.-This provides for an outer harbor 14 feet deep
enclosed by two piers or breakwaters, one on the north side of the
river, 1,102 feet long extending approximately normal to the shore
into the lake, and the other, 1,530 feet long, extending from the shore
at a point about 1,000 feet south of the original river mouth, and
for a channel of same depth as outer harbor, except where rock is
encountered at less depth, extending from that depth in the lake up
the river a distance of 1,000 feet from its mouth, a total length of
about 2,100 feet; this channel varies in width from 175 to 100 feet at
Second Street Bridge. The breakwaters are formed of stone-filled
timber cribs, concrete caissons, and piling, all of which are capped
with concrete superstructure.
   The project depth is referred to low-water datum for Lake Michi-
gan, which is taken at 578.5 feet above mean tide level at New York.
The fluctuations of water level are seasonal changes of about one-
half foot above or below the annual mean stage and extreme fluctua-
tions of a temporary nature, due to wind and barometric pressure,
of about 11/2 feet above or below the mean lake level prevailing at
the time.
   The estimate of cost for new work, made in 1907, was $140,000,
exclusive of amounts expended on previous projects. The latest
 (1917) approved estimate for annual cost of maintenance is $3,500.
   The existing project was authorized by the following River and
Harbor Acts: The act of March 3, 1871, provided for the north pier
or breakwater (Annual Report for 1871, p. 126); the act of March 2,
1907, provided for the south breakwater and the present channel
dimensions without prior survey or estimate (unpublished report
submitted September 25, 1907). (For latest published map see
Annual Report for 1908, p. 1954.)
   Terminal facilities.-Consist of 1 coal wharf with 475 feet front-
age, 2 lumber and wood wharves with 155 feet frontage, and 2 fishing
wharves with 240 feet frontage. These facilities are considered
adequate for existing commerce.
   Operations and results during fiscal year.-Operations consisted of
taking soundings at a deferred cost of $264.20. The total net ex-
penditures were $222.18.
    Condition at end of fiscal year.The existing project was com-
pleted in 1909 at a saving of $40,764 under the estimated cost. The
north pier was completed in 1890, the south pier and breakwater and
dredging in 1909. The lake side of the caisson breakwater has been
damaged by ice. The controlling depths at low-water datum at the
close of the fiscal year were about 14.5 feet in the entrance channel
for a distance of about 400 feet, decreasing to 10 feet to the coal wharf
at the shore line north of the north pier, thence 6.5 feet in a narrow
channel to Second Street Bridge. The outer basin had a controlling
  depth of 10 feet over a width of 400 feet on the westerly side for
about 350 feet south of the entrance channel, shoaling to about 7 feet
             RIVERS AND HARBORS-MILWAUKEE,                                        WIS., DISTRICT               1049
on the sides. The Ahnapee River is navigable for a distance of
about 2 miles from its mouth for vessels drawing not more than 4
feet. The costs of permanent work under the existing project are
$99,236.15 for new work and $178,500.45 for maintenance, a total of
$277,736.60. The total expenditures are $278,000.80.
   Proposed operations.-The balance unexpended, $5,464.95, will be
applied to maintenance, operation of U. S. dipper dredge Kew'aunee,
July-August 1934.
   The walls and part of the concrete superstructure on the caisson
breakwater are disintegrating to such extent that repairs should be
made as soon as funds are available. The old superstructure at the
inner end of the south pier should also be rebuilt in concrete. Dredg-
ing is required annually for maintenance of project dimensions of
,channel. The additional sum of $20,000 can be profitably expended
during the fiscal year ending June 30, 1936, as follows:
:Maintenance :
     Operation of U. S. dipper dredge Kewannee, summer 1935_--------- $4, 000
    Rebuild upper part of walls and part of superstructure on caisson
       breakwater, with United States plant, summer and fall 1935-      10, 600                          -.
    Rebuild superstructure on south pier, 200 linear feet, at $27, with .
       United States plant, summer 1935-------------------------- 5, 400
            Total              -----------------------------------------                                       20, 000
                                      Cost and financial summary
Cost of new work to June 30, 19,34 _.._____- ._______      -                                            $292, 009. 65
,Costof maintenance to June 30, 1934_._______--______-----                                               187, 188. 41
      Total cost of permanent work to June 30, 1934_-......   ___. 479, 198. 06
Value of plant, materials, etc., on hand June 30, 1934_._______..       264. 20
         Net total cost to June 30, 1934_-                       -___________--           ___-
                                                                                          -    -        479, 462. 26
Net total expenditures--__-_-
1Unexpended
                                -
                                ____ --      --
             balance June 30, 1934-----------------------------
                                                                  ________-479,5,462. 26
                                                                                 464. 95
         Total amount appropriated to June 30, 1934___- ----                                  ___--484, 927. 21

         Fiscal year ending June 30                  1930          1931            1932          1933           1934


(Costof new work--------------------------------
kCost of maintenance----------------------         $1, 491. 85   $6, 633. 21   $29, 692. 57   $74, 154. 01 -
Total expended.... -----------------------          1, 491. 85    6, 633. 21    14, 309. 79    89, 578. 81      $222. 18
Allotted---------------------------------           6, 000. 00    5, 500. 00    65, 000. 00    37, 800. 00      1,850. 00


Balance unexpended July 1, 1933__       ___________       _______ $3, 837. 13
Amount allotted from War Department Appropriation Act approved
  Mar. 4, 1933----------       -  -----------------------          4,000.00

      Amount to be accounted for_________--    -    ________                                                 7,837. 13
Deductions on account of revocation of allotment------------                                                 2,150. 00'

          Net amount to be accounted for-----__--         _____-_--                                          5,687. 13
(Gross amount expended------           -        ------------------                                             2221. 18

          Balance unexpended June 30, 1934__                         ______
                                                                       --                                    5, 464. 95

Amount that can be profitably expended in fiscal year ending June 30,
1936, for maintenance _-__--     ___------------------------         20, 000. 00

   1Exclusive of available funds.
1050   REPORT OF CHIEF OF ENGINEERS,         U.   S.   ARMY,   1934

                    8. KEWAUNEE HARBOR, WIS.

   Location.-On the west shore of Lake Michigan, distant about 105
miles northerly from Milwaukee and about 78 miles from Green Bay,
via Sturgeon Bay Canal. The harbor is at the mouth of the
Kewaunee River. (See U. S. Lake Survey Chart No. 73.)
   Previous projects.-The original project was adopted by the River
and Harbor Act of March 3, 1881. The cost and expenditures prior
to the commencement of the existing project in 1916 were $149,312.44
for new work, $88,363.97 for maintenance, a total of $237,676.41.
For further details see page 1936 of Annual Report for 1915.
   Existing project.-This provides for protecting the mouth of the
Kewaunee River by parallel piers 200 feet apart, each 1,850 feet in
length, and for a channel 18 feet deep from that depth in the lake
to an interior turning basin of the same depth formed by cutting
away part of the point between the old and present river channels;
the channel is 2,200 feet long and 160 feet wide. The piers are
formed of stone-filled piling, both of which have been repaired with
concrete superstructure.
   The project depth is referred to low-water datum for Lake Michi-
gan, which is taken at 578.5 feet above mean tide level at New York.
The fluctuations of water level are seasonal changes of about one-half
foot above or below the annual mean stage, and extreme fluctuations
of a temporary nature, due to wind and barometric pressure, of about
11/2 feet above or below the mean lake level prevailing at the time.
   The estimate of cost for new work, made in 1907, was $53,690, ex-
clusive of amount expended on previous projects. The latest (1928)
approved estimate of annual cost of maintenance is $7,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1881, provided for the entrance
channel and the entrance piers (Annual Report for 1881, p. 2082);
the act of June 25, 1910, provided for present channel dimensions
 (H. Doc. No. 324, 60th Cong., 1st sess.). The latest published maps
are in the last-mentioned document and Rivers and Harbors Com-
mittee Document No. 43, Seventy-second Congress, first session.
   Recommended modifications of project.-Under date of June 27,
1932, the Chief of.Engineers recommended modification of the exist-
ing project so as to provide for the construction of a converging
north breakwater, with shore connection, having a total length of
about 3,130 feet, the removal of about 1,400 feet of the old north pier,
widening of the entrance channel to a general width of 525 feet,
deepening of the channel and basin to 20 feet, and the removal of
the south shoal to a depth of 22 feet, all at an estimated cost of
$665,000, with $3,000 annually for maintenance in addition to that
now required. (Rivers and Harbors Committee Document No. 43,
72d Cong., 1st sess.).
   Local cooperation.-Complied with.
   Terminal facilities.-Consistof 2 car-ferry slips, 1 coal, wood, and
grain wharf, and 1 package-freight wharf. These facilities are con-
sidered adequate for existing commerce.
   Operations and results during fiscal year.-Operationsconsisted of
dredging 50,000 cubic yards, by hired labor and use of Government
plant, for restoration of project depth, at a cost of $8,359.61 for
maintenance. The total net expenditures were $9,000.
                   RIVERS AND HARBORS-VILWAUKEE,                                             WIS.,         DISTRICT           1051

    Condition at end of fiscal year.-The existing project was corn-
pleted in 1918 at a saving of $28,792 under the estimated cost. The
dimensions of the entrance channel are 160 feet wide and 2,200 feet
long, and the interior basin from about 730 to 450 feet wide and
about 800 feet long. The piers were completed in 1897 and the
dredging in 1918. The piers are in generally good condition. The
controlling depth at low-water datum at the close of the fiscal year
was 18.5 feet over a middle width of 60 feet in the entrance channel
between the piers. The inner basin had a controlling depth of 18
feet over an area 400 feet by 500 feet. The Kewaunee River is navi-
gable for a distance of about 61/2 miles above the mouth for craft
drawing not more than 4 feet. The costs of permanent work under
the existing project are $24,898.03 for new work and $159,281.41 for
maintenance, a total of $184,179.44. The total expenditures are
$186,125.52.
    Proposed operations.-The balance unexpended, $7,848.07, will
be applied to maintenance operation of U. S. dipper dredge Ke-
waunee during November 1934.
    Dredging is required annually for maintenance of project dimen-
sions of channel. The additional sum of $7,000 can be profitably
'expended  during the fiscal year ending June 30, 1936, in maintenance
operation of U. S. dipper dredge Kewaunee 18 days during the fall
of 1935.
                                                   Cost and financial summary

Cost of new work to June 30, 1934------_--........       .____-                                                      $174, 210. 47
Cost of maintenance to June 30, 1934          ____---------- ______                                           -       247, 645. 38
      Total cost of permanent work to June 30, 1934_... ___..._                                                       421, 855. 85
Value of plant, materials, etc., on hand June 30, 1934___ ___----1,                                                        946.08
             Net total cost to June 30, 1934----                                   -------------------                423, 801.93

Net total expenditures ------------------------------------                                                           423, 801.93
Unexpended balance June 30, 1934   __     ________                                                                      7, 848. 0.7
             Total amount appropriated to June 30, 1984----___--__---                                                 431, 650. 00

             Fiscal year ending June 30                           1930            1931         1932           1933            1934

Cost of new work ..................I........
Cost of maintenance...............-------------------........ $7, 910. 31     $15, 651. 02   $3, 392. 25    $9, 421. 89      $8, 359. 61
Total expended-----............-----------------.............    7, 910. 31    15, 570. 04    3, 374. 89    10, 744. 94       9,000.00
Allotted- ------------------------..
                         .         .---                         15,000. 00     10, 000.00 -----------       12,750.00         9,600.00


Balance unexpended July 1,1933_________________________                                                                   $7, 248.07
Amount allotted from War Department Appropriation Act approved
  Mar. 4, 1933-----     -----------------------------------                                                               10, 000. 00
      Amount to be accounted for--- ---           - ---     ---    -------                                                17, 248. 07
Deductions on account of revocation of allotment--__- -- __-               -      _                                           400. 00
      Net amount to be accounted for----                     -  ----                                                      16, 848. 07
Gross amount expended---------------------------$9,                        012. 02
Less reimbursements collected----- -------------------                       12. 02
                                                                                                                           9, 000.00
      Balance unexpended June 30, 1934--------------------          _ 7, 848. 07
Amount that can be profitably expended in fiscal year ending June 30,
                                                          - - -   -
1936, for maintenance 1 - - - - - - - - - - - -                      7, 000. 00
    1 Exclusive of available funds.
1052   REPORT   OF CHIEF OF ENGINEERS,     U.   S. ARMY,   1934

                   9. TWO RIVERS HARBOR, WIS.

    Location.-This harbor is on the west shore, of Lake Michigan,,
distant about 82 miles northerly from Milwaukee and about 101 miles,
from Green Bay via Sturgeon Bay Canal. (See U. S. Lake Survey
Chart No. 73.)
    Previous projects.-Adopted by the River and Harbor Act of
March 3, 1871. The cost and expenditures prior to the commence-
ment of work under the existing project in 1907 were $212,857.20
for new work, $33,113.35 for maintenance, a total of $245,970.55.
For further details see page 1936 of Annual Report for 1915.
    Existing project.-This provides for two entrance piers at the
mouth of Twin Rivers, 245 feet apart at the outer ends and 750 feet
apart at the shore line, having lengths of about 1,640 feet and 1,720
feet for the north and south piers, respectively; for a channel 2,500
feet long and 14 feet deep extending from that depth in the lake
to an inner basin at the confluence of the East and West Twin
Rivers, the channel varying in width from 500 feet at the outer end
to 200 feet between the piers; for a revetment about 450 feet long
on the north side at the inner end of the channel, and for a small
stilling basin beyond the shore line on the north side of the channel.
The piers are formed of stone-filled timber cribs and piling; 1,241
feet of the north pier and 198 feet of the south pier has been pro-
vided with concrete superstructure; about 300 feet of the south pier
has been provided with rubble superstructure; the remaining 904
feet of the crib piers has been paved with concrete; the revetment on
north side, of channel is provided with concrete superstructure.
    The project depth is referred to low-water datum for Lake Michi-
gan, which is taken at 578.5 feet above mean tide level at New York.
The fluctuations of water level are seasonal changes of about one-
half foot above or below the annual mean stage and extreme fluctua-
tions of a temporary nature, due to wind and barometric pressure, of
about 11/2 feet above or below the mean lake level prevailing at the
time.
    The estimate of cost for new work, revised in 1917, was $55,000,
exclusive of amounts expended on previous projects. The latest
 (1928) approved estimate of annual cost of maintenance is $7,000.
    The existing project was authorized by the following river and
harbor acts: The act of March 3, 1871, provided for the south pier,
750 feet of the north pier, and about 44 feet of the north revetment
  (Annual Report for 1871, p. 123, as modified by the Chief of Engi-
neers Feb. 27, 1897); the act of March 2, 1907, providing for the
remainder of the north pier, the stilling basin, and present channel
dimensions (modification of plan A, H. Doc. No. 730, 59th Cong.,
1st sess.). The latest published maps are in the last-mentioned docu-
ment, House Document No. 727, Seventy-first Congress, third session,
and Rivers and Harbors Committee Document No. 25, Seventy-third
Congress, second session.
    Reconmmended modifications of project.-Under date of January
27, 1931, the Chief of Engineers recommended modification of the
existing project so as to provide for a depth of 18 feet below datum
  in the entrance channel and inner basin at an estimated cost of
  $27,000, with $2,000 annually for maintenance in addition to that now
  required. (H. Doc. No. 727, 71st Cong., 3d sess.)
        RIVERS AND            HARBORS-MILWAUKEE,         WIS.,    DISTRICT      1053
    Under date of January 3, 1934, the Chief of Engineers recom-
mended modification of the existing project so as to provide for a
depth of 18 feet below datum in the entrance channel and inner basin,
as previously recommended, at an estimated cost of $30,000 with no
increase in the present estimated cost of maintenance. (Rivers and
Harbors Committee Doc. No. 25, 73d Cong., 2d sess.)
  . Local cooperation.-Fully complied with.
    Terminal facilities.-There are four private wharves used for coal,
wood, lumber, and fishing. The city operates one wharf without
warehouses for public use. These facilities are considered generally
adequate for existing commerce.
    Operations and results duing fiscal year.-Operationsconsisted of
dredging 64,847 cubic yards, by hired labor and use of Government
plant, for restoration of project depth at a cost of $13,692.41, for
maintenance. The total net expenditures were $13,758.36.
    Coadition at end of fiscal year.-The existing project was com-
pletedin 1909 at a saving of $1,441 under the estimated cost. The
south pier was completed in 1883, the north pier in 1908, and the
dredging in 1909. The piers are in fair condition and should last
for a few more years without having to rebuild the remaining tim-
ber superstructures in concrete. The controlling depth at low-water
datum at the close of the fiscal year was about 17 feet over the full
width in the entrance channel between the piers and inner basin.
East and West Twin Rivers are navigable for about 3 and 7 miles,
respectively, from the harbor piers for craft drawing not more than
4 feet. The costs of permanent work under the existing project are
 $53,559.40 for netw work and $263,969.68 for maintenance, a total of
 $317,529.08. The total expenditures are $317,529.08.
    Proposed operations.-The balance unexpended will be applied as
follows :
Maintenance:
    Operation of U. S. dipper dredge Kewaunee, April 1935 ______             $8, 441. 64
    Riprap piers with United States plant, 1,000 tons at $3.30,
      during the fiscal year-------------------------------------             3, 300. 00
      Total ---------------------------------------------------              1,
                                                                             11,741.64
  Dredging is required annually for maintenance of project dimen-
sions of channel. The additional sum of $8,500 can be profitably
expended during the fiscal year ending June 30, 1936, as follows:
Maintenance:
    Operation of U. S. dipper dredge Kewaunee, 20 days at $350,
      April 1936 --------------------------------------             $7, 000
    Minor repairs to piers and revetments with United States plant,
      during the fiscal year-----------------------------------      1, 500
      Total----------------------------                          ------------     8,500

                                 Cost and financial summary

Cost of new work to June 30, 19,34 -----------------------------          $266, 416. 60
Cost of maintenance to June 30, 1934 -------------------                   297, 083. 03

       Total cost of permanent work to June 30, 1934-----------            563, 499. 63

Net total expenditures__--_------------------                              563, 499. 63
Unexpended balance June 30, 1934 ------------------------                   11, 741. 64
      Total amount appropriated to June 30, 1934- ...                      575, 241. 27
1054         REPORT OF CHIEF OF ENGINEERS,                                  U.     S.   ARMY,       1934


         Fiscal year ending June 30                    1930          1931            1932         1933            1934

Cost of new work-------          ------------       -----------------------------------------
Cost of maintenance--------------------- $80, 371. 15 $29, 523.49             $6, 776. 21       $7, 717. 33     $13, 692. 41
Total expended--------------------------            76, 437. 49   24, 264. 06     12, 013. 01    7, 679. 15      13, 758. 36
Allotted---------------------------------           24, 500. 00   45,000.00-17, 000. 00          5, 800. 00      24,967. 49


Balance unexpended July 1, 1933----_-------- --- _---------                                                     $532. 51
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934-.--__--------------      $11, 000.00
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933 -----------------       -14, 000. 00
                                                                                                              25, 000. 00
     Amount to be accounted for_     -____         ______ ___-_                                               25, 532.51
Deductions on account of revocation of allotment ------------                                                      32. 51

      Net amount to be accounted for---------------------                                                     25, 500.00
Gross amount expended_....    ___            ______-----------------                                          13, 758.36
         Balance unexpended June 30, 1934--
                                         .....                                   .---------                   11, 741. 64

Amount that can be profitably expended in fiscal year ending June
                             - - _- - - -    - - - - -_  - --
30, 1936, for maintenance 1              __            _     ____                                             8, 500.00

                                 10. MANITOWOC HARBOR, WIS.

   Location.--This harbor is on the west shore of Lake Michigan, dis-
tant about 79 miles northerly from Milwaukee and about 106 miles
from Green Bay via Sturgeon Bay Canal. (See U. S. Lake Survey
Chart No. 734.)
   Previovs projects.-The original project was adopted in 1854, the
first appropriation for the improvement having been made by the
River and Harbor Act of August 30, 1852. The project was modi-
fied by subsequent River and Harbor Acts of 1881, 1890, 1896, and
1902. The cost and expenditures prior to the commencement of work
under the existing project in 1907 were $400,126.14 for new work and
$54,287.93 for maintenance, a total of $454,414.07. For further de-
tails see page 1937 of Annual Report for 1915.
   Eisting project.-This provides for an outer harbor or stilling
basin formed by two breakwaters extending from the shore on either
side of the mouth of the Manitowoc River, 425 feet apart at their
outer ends and diverging to a distance of 2,180 feet apart at their
inner ends, having lengths of 2,540 feet and 2,290 feet for the north
and south breakwaters, respectively, and for a channel 18 feet deep,
extending from that depth in the lake through the outer harbor to
the mouth of the river, a total length of about 2,000 feet, with a
width of about 500 feet. The breakwaters are formed of stone-filled
timber cribs, concrete caissons, and piling, all of which are capped
with concrete superstructures.
   The project depth is referred to low-water datum for Lake Michi-
gan, which is taken at 578.5 feet above mean tide level at New York.
  1 Exclusive of available funds.
        RIVERS AND HARBORS       MILWAUKEE,     WIS., DISTRICT     1055

'The fluctuations of water level are seasonal changes of about one-
half foot above or below the annual mean stage, and extreme fluctu-
ations of a temporary nature, due to wind and barometric pressure,
of about 11/2 feet above or below the mean lake level prevailing at
the time.
   The estimate of cost for new work, made in 1907, was $486,000,
exclusive of amounts expended on previous projects. The latest
 (1917) approved estimate for annual cost of maintenance is $8,000.
    The existing project was adopted by the River and Harbor Act of
March 2, 1907 (H. Doc. No. 62, 59th Cong., 1st sess., as modified by
Rivers and Harbors Committee Doc. No. 3, 59th Cong., 2d sess.).
For the latest published maps see House Document No. 481, Seventy-
second Congress, second session, and Rivers and Harbors Committee
Document No. 39, Seventy-third Congress, second session.
    Recommended modifications of project.-Under date of October 10,
1932, the Chief of Engineers recommended modification of the exist-
ing project so as to provide for an entrance channel 650 feet wide
and 21 feet deep, for removal of the old pier constructed by the
Federal Government at the river entrance, and for the construction
of a pile clump fender in the river, all at an estimated cost of $60,000
with maintenance estimated at $2,000 annually in addition to that
now required. (H. Doc. No. 481, 72d Cong., 2d sess.)
    Under date of April 27, 1934, the Chief of Engineers recom-
mended modification of the existing project so as to provide for an
entrance channel 650 feet wide and 21 feet deep at present datum,
and for removal of the old pier constructed by the Federal Govern-
ment at the river entrance, all at an estimated cost of $77,000, with
annual maintenance estimated at $2,000 in addition to that now
required and for dredging in the outer harbor an approach channel
to the proposed city terminal, at an estimated cost of $68,000, with
 $1,500 annually for maintenance, provided that this work shall not
be undertaken until local interests shall have submitted assurances
satisfactory to the Secretary of War that such terminal will be con-
structed. (Rivers and Harbors Committee Doc. No. 39, 73d Cong.,
2d sess.)
    Terminal facilities.-Besides 3 car-ferry slips there are 12 wharves
used for handling coal, building materials, and miscellaneous com-
modities. While these facilities are considered fairly adequate for
existing commerce, it is believed the city should provide a suitable
wharf with warehouse and railway connection, which should be open
to the general public.
    Operations and results during fiscal year.-Operations consisted
of completing repairs to the superstructure of the concrete caisson
  section of the south breakwater, which were in progress at the close
of the previous fiscal year, and commencing the repairs to the super-
structure of the concrete caisson section of the north breakwater, at
  a cost of $11,668.44. Sweeping operations done during the previous
fiscal year involved a cost of $203.21. Soundings cost $712.92. .All
  work was done by hired labor and use of Government plant. The
      91536-ENG 1934-67
1056       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

total cost was $12,584.57 for maintenance.                                       The total net expendi-
tures were $13,398.94.
  Condition at end of fiscal year.-The existing project was com-
pleted in 1910 at a saving of $251,751 under the estimated cost.
The breakwaters, completed in 1910, are in good condition, except
that the concrete superstructure on the north caisson section requires
repairs. The dredging was completed in 1908. The controlling
depth at low-water datum at the close of the fiscal year was 20 feet
over a minimum width of about 200 feet in mid-channel through the
outer basin, diminishing to about 15 feet along the edges of the 500-
foot channel. The costs of permanent work under the existing
project are $234,248.48 for new work, $426,413.33 for maintenance,
a total of $660,661.81.                    The total expenditures are $659,343.42.
  Proposed operations.-The balance unexpended, including ac-
counts receivable, will be applied as follows:
Accounts payable June 30, 1934-------                                                                          $1, 569. 14
Maintenance:
    Operation of U. S. dipper dredge Kewaunee, June 1935 .------                                                7, 500. 00
    Complete repairs to caissons and superstructure on north caisson
      breakwater with United States plant, summer and fall 1934___                                              5, 500. 00
    Minor repairs to breakwaters and piers by hired labor during the
      fiscal year--                                            ---                                               , 000. 00
                                                                                                                1--------------------------
        Total --------------------------------------                                                           15, 569. 14
Balance remaining--------- -----------------   -----                                                            4, 721.46

         Total-----------------------------------------------                                                  20, 290. 60
  It is estimated that funds available will suffice for ordinary main-
tenance operations during the fiscal year 1936 and that no additional
funds will be required.
                                       Cost and financial summary

Cost of new work to June 30, 1934__ ______-----                  $634, 374. 62
Cost of maintenance to June 30, 1934---------------------------- 480, 701. 26
      Total cost of permanent work to June 30, 1934------------                                        1, 115, 075. 88
Value of plant, materials, etc., on hand June 30, 1934 ...... __                                               120. 78

      Net total cost to June 30, 1934__________________________ 1, 115, 196. 66
Plus accounts receivable June 30, 1934-------------------------         129. 97

     Gross total costs to June 30, 1934__-------------                                                 1, 115, 326. 63
Minus accounts payable June 30, 1934---------------------                                                   1, 569. 14

     Net total expenditures--------------------------------                                            1, 113, 757. 49
Unexpended balance June 30, 1934__ _____     ____------20,                                                     160. 63

         Total amount appropriated to June 30, 1934                             --------------         1,133, 918. 12

         Fiscal year ending June 30                   1930           1931            1932          1933             1934

Cost of new work ...-------------------------------------------------------
Cost of maintenance-----------------------            $7, 676. 94 $3, 218. 28      $4, 880. 79   $8, 718. 12      $12, 584. 57
Total expended        -----------------------        7, 676. 94     3, 218. 28      5, 208.18     6, 257.97        13, 398. 94
Allotted----------------------------------           5, 000.00      7, 000.00    ------------     5, 800.00        27, 800.00
          RIVERS    AND HARBORS -MILWAUKEE,                 WIS.,   DISTRICT        1057

Balance unexpended July 1, 1933---------       --------------- $5, 759. 57
Amount allotted from War Department Appropriation Act approved
  Mar. 4, 1933--------------------------- -------------------- 34, 600. 00

     Amount to be accounted for     ________-------------------                40, 359. 57
Deductions on account of revocation of allotment--                                 800. 00
                                                                                6----------------,

      Net amount to, be accounted for_ _______-----------
                                        --                        33, 559. 57
Gross amount expended                                $13, 399. 06
Less reimbursements collected____--____-__-___              0. 12
                                                                  13, 398. 94

      Balance unexpended June 30, 1934_..___________---__--                    20, 160. 63
Outstanding liabilities June 30, 1934-----------------------------              3, 201. 06

      Balance available June 30, 1934__--------___-__-_                        16, 959. 57
Accounts receivable June 30, 1934 --------------------------------                 129. 97

       Unobligated balance available June 30, 1934 _____________ 17, 089. 54

                        11. SHEBOYGAN         HARBOR,      WIS.

   Locatioi.-This is on the west shore of Lake Michigan, distant
about 26 miles south from Manitowoc, and about 55 miles north of
Milwaukee. (See U. S. Lake Survey Chart No. 737.)
   Previous projects.-The original project was adopted by the River
and Harbor Act of June 23, 1866. This project was modified by sub-
sequent River and Harbor acts of 1873, 1881, 1894, 1899, and 1902.
The total cost and expenditures prior to commencement of the exist-
ing project in 1907 are $487,816.64 for new work and $87,131.46 for
maintenance, a total of $574,948.10. For further details see page
1.937 of Annual Report for 1915.
   Existing project.--This provides for an outer harbor or stilling
basin formed by a breakwater extending from the shore about 2,250
feet north of the mouth of the Sheboygan River for a total length
of 3,829 feet, and a south pier 2,750 feet long extending into the lake
about normal to the shore on the south side of the mouth of the
river, and for a turning basin 900 feet wide and 20 feet deep in the
outer harbor with an entrance channel 3,300 feet long through the
south side of the basin, the width being 200 feet at the inner end
of south pier and 350 feet at outer end of breakwater, the depth
being 20 feet, increasing to 22 feet at the lakeward end. The north
breakwater is formed of stone-filled timber cribs, concrete caissons,
and piling, all of which is capped with concrete superstructure.
The south pier consists of timber cribs and piling, all of which has
also been provided with concrete superstructure.
   The project depth is referred to low-water datum for Lake Michi-
gan, which is taken at 578.5 feet above mean tide level at New York.
The fluctuations of water level are seasonal changes of about one-
half foot above or below the annual mean stage and extreme fluc-
tuations of a temporary nature, due to wind and barometic pressure,
of about 1/2 feet above or below the mean lake level prevailing at
the time.
   The estimate of cost of new work revised in 1927 was $497,000.
This estimate is exclusive of amounts expended on previous projects.
The latest (1928) approved estimate of annual cost of maintenance
is $12,000,
1058    REPORT    OF CHIEF OF ENGINEERS,          U.     S. ARMY,     1934

   The existing project was authorized by the following river and
harbor acts: The act of March 2, 1907, provided for the north break-
water (H. Doc. No. 62, 59th Cong., 1st sess.) ; and the act of January
21, 1927, provided for preserving the south pier as part of the
project, for the turning basin, and for present channel dimensions,
and eliminated the proposed south breakwater (H. Doc. No. 475, 68th
Cong., 2d sess.). For latest published map see the last mentioned
document.
   Terminal facilities.-There are several private wharves, and the
city of Sheboygan has established a public terminal equipped with
warehouse. These facilities are adequate for existing commerce.
   Operations and results during fiscal year.-Operations consisted of
dredging 138,236 cubic yards for restoration of project depth at a
cost of $17,830.17. Rebuilding, by contract, the superstructure on
the inner 1,239.5 linear feet of the south pier, in concrete, which was
in progress at the close of the previous fiscal year, was completed at
a cost of $7,274.82. Placing 3,949 tons of stone as riprap along the
breakwater and pier cost $9,086.92. Rebuilding 100 linear feet of
north inner revetment which had failed cost $5,311.38. All work,
except rebuilding the superstructure on the south pier, was done by
hired labor and use of Government plant. The total cost was
$39,503.29 for maintenance. The total net expenditures were
$43,944.75.
   Condition at end of fiscal year.-The existing project providing
for construction of north breakwater was completed in 1915 and the
south pier in 1904. Work on the modified project for turning basin
and increased depth in entrance channel was completed in 1931 at a
saving of $72,723 under the estimated cost. The pier and breakwater
are in good condition, except that both require riprap. The north
revetment requires repairs. The inner 260 feet of the south pier
has been entirely removed and replaced with a revetment by private
interests under permit granted July 16, 1931, by the Secretary of
War. The pier is therefore maintained only for a length of about
2,490 feet. The controlling depth at low-water datum at the close
of the fiscal year was 20 feet in the entrance channel and turning
basin for the full width in the easterly half and for a width of 550
feet from the face of the south pier in the westerly half. Sheboygan
River is navigable for a distance of about 11/2 miles above its mouth
for craft drawing not more than 4 feet. The costs of permanent
work under the existing project are $424,277.39 for new work and
$410,104.47 for maintenance, a total of $834,381.86. The total ex-
penditures are $834,628.69.
   Proposed operations.-Thebalance unexpended, including accounts
receivable, will be applied as follows:
Accounts payable June 30, 1934---------------------------             ----      $112. 23
Maintenance:
    Operation of U. S. dipper dredge Kewawnee, July 1934 and
      June 1935 ----------------------------------------------        12, 161. 93
    Riprap breakwater and piers with United States plant, 2,000 tons,
      at $3.30 during the fiscal year__-____--  ..-----------     __-  6, 600. 00

        Total                       ------------------          ---           8, 874. 16
                                                                             1-----------------
  The north revetment requires reinforcement of anchorage and re-
building of the superstructure to prevent further failure. Riprap is
               RIVERS AND HARBORS-MILWAUKEE,                                          WIS., DISTRICT                     1059
required along the north breakwater and the south pier.                                                         Dredging
is required annually for maintenance of project dimensions of chan-
nel.       The additional sum of $26,000 can be profitably expended dur-
ing the fiscal year ending June 30, 1936, as follows:
Maintenance:
    Operation of U. S. dipper dredge Kewaunee, June 1936------- $9,400.00
    Riprap north breakwater and south pier, 2,000 tons, at $3.30 with
      United States plant during the fiscal year_--                       600. 00
                                                                       6___________6,
    Reinforce substructure and rebuild superstructure on 300 feet of
      north revetment with United States plant, fall, 1935 --------   10, 000. 00
              Total-------                  ----------------              -------------------                        26, 000. 00
                                          Cost and financial summary

Cost of new work to June 30, 1934_-......                                           -
                                                                            _____--------                       $912, 094. 03
Cost of maintenance to June 30, 1934_.....                                  _____     ___-------                 497, 235. 93
      Total cost of permanent work to June 30, 1934___--.--- __ 1, 409, 329. 96
Plus accounts receivable June 30, 1934 -------------------------        359. 06

     Gross total costs to June 30, 1934 .__-___.-------                                                     1, 409, 689.02
Minus accounts payable June 30, 1934-------------------                                                     -       112. 23
     Net total expenditures_- .. _________ ___-                                                 -_____ 1, 409, 576. 79
Unexpended balance June 30, 1934                                                                           18, 515. 10
           Total amount appropriated to June 30, 1934                                                         , 428, 091. 89
                                                                                                             1_____

          Fiscal year ending June-30                      1930           1931            1932           1933             1934


Cost of new work-.....----          .-------------------.             $16, 702. 05    $8, 214. 92-----------------
Cost of maintenance.---------------....                $13, 716. 76     7, 544. 56    19, 156. 37 $34, 372. 65         $39, 503. 29
       Total cost---------      --------------          13, 716. 76    24, 246. 61    27, 371. 29     34, 372. 65       39, 503. 29
Total expended-------------------                       13, 716. 76    19, 262. 40    26, 383. 00     36, 150. 52       43, 944. 75
Allotted----------------------------------             46, 000. 00     18, 000. 00   -5, 000. 00      48, 550. 00       42, 500. 00


Balance unexpended July 1, 1933---------____________            $19, 959. 85
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934_____________________ $18, 000.00
Amount allotted from War Department Appropriation
Act approved July 14, 1932 ______--      __  ____ - 2, 500. 00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933_____ ________________ 22, 000. 00
                                                                 42, 500. 00

      Amount to be accounted for_________________________0___                                                        62, 459. 85
Gross amount expended ________________________       44, 266. 27
Less reimbursements collected_ ______-_____ -      -__ 321. 52
                                                                                                                     43, 944. 75

      Balance unexpended June 30, 1934____                                                                      -8, 515. 10
                                                                                                                 1______------
Outstanding liabilities June 30, 1934____________                                    ________              __           112. 23
     Balance available June 30, 1934 _____..      _________ -                                                        18, 402. 87
Accounts receivable June 30, 1934------------------------------                                                          359. 06

          Unobligated balance available June 30, 1934___ ________ -18,                                                  761. 93

Amount that can be profitably expended in fiscal year ending June
                                               - - - - - - - -
30, 1936, for maintenance 1 - - - - - - - - -                    26,000. 00
  1 Exclusive of available funds.
1060   REPORT   OF   CHIEF OF ENGINEERS,     U. S.   ARMY,   1934

                12. PORT WASHINGTON      HARBOR, WIS.

   Location.--On the west shore of Lake Michigan, distant about 53
miles south from Manitowoc and about 29 miles north from Mil-
waukee. (See U. S. Lake Survey Chart No. 74.)
   Previous projects.-The original project was adopted by the River
and Harbor Act of July 11, 1870. This project was modified by the
River and Harbor Act of August 14, 1876. The cost and expenditures
prior to the commencement of the existing project in 1910 were
$188,495.08 for new work, $15,123.46 for maintenance, a total of
$203,618.54. (For further details see p. 1938 of Annual Report for
1915.)
   Existing project.-This provides for two parallel piers about 150
feet apart, having a length of 920 feet each, and for a channel 16
feet deep from that depth in the lake leading to two interior basins
having the same depth, the west basin being 150 by 490 feet, and
the north basin, 190 by 770 feet; this channel has a total length of
about 1,400 feet and varies in width from 375 feet at the outer end in
the lake to about 120 feet between the piers. The piers are formed
of stone-filled timber cribs; about 370 feet of the south pier and 93
feet of the north pier at the inner ends have been provided with
rubble superstructure.
   The project depth referred to is low-water datum for Lake Michi-
gan, which is taken at 578.5 feet above mean tide level at New York.
The fluctuations of water level are seasonal changes of about one-
half foot above or below the annual mean stage, and extreme fluc-
tuations of a temporary nature, due to wind and barometric pressure,
of about 11/2 feet above or below the mean lake level prevailing at
the time.
   The estimate of cost for new work, made in 1909, was $30,000,
exclusive of the amounts expended on previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $4,600.
The existing project was authorized by the following river and har-
bor acts: The act of July 11, 1870, provided for the entrance piers
and the south basin (H. Ex. Doc. No. 28, 41st Cong., 2d sess.) ; the act
of August 14, 1876, provided for the north basin. (Annual Report
for 1876, pt. 2, p. 379) ; the act of June 25, 1910, provided for present
channel dimensions (H. Doc. No. 306, 61st Cong., 2d sess.). (For lat-
est published maps see Annual Report for 1903, opposite p. 1856, and
H. Doc. No. 168, 72d Cong., 1st sess.)
   Supplementing the work authorized by Congress, the construction
of a north breakwater 2,592 feet long, removal of 650 feet of the
north pier, dredging an outer basin and entrance channel to 21 feet
and inner basins to 18 feet below the established datum plane of
Lake Michigan, as recommended by the Chief of Engineers in House
Document No. 168, Seventy-second Congress, first session, has been
included in the Public Works program under the National Industrial
Recovery Act.
   Recommx-rended modifications of project.-Included in Public Works
program.
         RIVERS   AND HARBORS--MILWAUKEE,           WIS.,   DISTRICT    1061
  Local cooperation.-The work to be carried out under the Public
Works program is subject to the following conditions:
   (1) That no expense shall be incurred by the United States for the acquir-
ing of any lands required for the purpose of the improvement.
   (2) That no work shall be undertaken on the project until the Secretary of
War is satisfied that improvements by local interests on the south side of the
harbor will be sufficiently advanced to afford the adequate utilization of the
harbor by the time that the Federal improvement is completed.
   (3) That the authorization of the project shall not relieve the Milwaukee
Electric Railway & Light Co., or its successors and assigns, of any obligation
imposed in the approval of the plans for the structures and work on the south
side of the harbor.
   As the shore connection lands at a street end against an existing
revetment, no land will be required to be donated to the United
States. On November 4, 1933, the Secretary of War approved the
plan of improvements by local interests and authorized the Public
Works program to proceed. By an amended War Department per-
mit of November 22, 1932, the Milwaukee Electric Railway & Light
Co. agreed to dredge and maintain, as a settling basin for silt and
stone deposits from Sauk River, all the area south of the former
Government dredging limits over to their newly constructed wharves
to certain specified depths, in lieu of the annual payment of $4,000
to the United States for estimated increased dredging costs due to
diversion of the river into the harbor, which was required by the
original permit dated October 25, 1930. Under the original permit,
the Milwaukee Electric Railway & Light Co. has removed the old
south pier and revetment and all required original dredging has
been done.
   Terminal facilities.-There are 10 private wharves which handle
coal, lumber, fish, and miscellaneous freight. The city of Port
Washington operates a wharf with warehouse which is open to
public use. These facilities are considered adequate for existing
commerce.
   Operations and results during fiscal year.-Existing project: Oper-
ations consisted of dredging 4,000 cubic yards, by hired labor and use
of Government plant, for restoration of project depth at a cost of
$946.31, for maintenance. The total net expenditures were $2,420.13.
   Work authorized by Federal Emergency Administration of Public
Works consisted of commencing, by contract, the construction of the
north breakwater, pier removal, and dredging' at a total cost of
$197,348.02, for new work. The total net expenditures were
$181,774.12.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1911 at a saving of $7,554 under the estimated cost. The
north pier was completed in 1887, the south pier in 1893, and the
dredging in 1911. The old south pier has been entirely removed
and the entrance channel widened to 215 feet at the outer end,
increasing to 240 feet at the inner end of the north pier by private
interests under permit granted October 25, 1930, by the Secretary
of War. The entrance width has been temporarily reduced to 165
feet by a crib and rubble mound on the south side of the entrance
1062            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                           1934

by War Department permit dated November 10, 1932.                                                                           The con-
trolling depths at low-water datum at the close of the fiscal year
were 17 feet over the Government portion of the entrance channel
and 18.5 feet over the private channel to the south. The west and
north basins had a controlling depth of 15 feet. The costs of perma-
nent work under the existing project are $22,446.30 for new work,
$87,779.89 for maintenance, a total of $110,226.19.                                                              The total ex-
penditures are $110,226.19, all from regular funds.
  The work being done under the Public Works program is about
13.5 percent completed.    The breakwater is under construction, no
work having been done on pier removal or dredging.                                                                   The cost of
permanent work under the Public Works program is $197,348.02 for
new work. The total expenditures are $181,774.12.
  Proposed operations.'The balance unexpended, including ac-
counts receivable, will be applied as follows:
Maintenance:
    Operation of U. S. dipper dredge Kewaunee, May 1935---------- $7,000. 00
    Unallocated balance ----------------------------------------   1, 655. 27
            Total ------                                          --                                                             8,655. 27
                                                                                                                          _----------


  The unexpended funds from the National Industrial Recovery
Act will be applied as follows:
Accounts payable, June 30, 1934-------------------------------    $20, 885. 19,
New work:
    Complete construction of north breakwater and shore connec-
      tion, removal of old north pier and dredging by contract in
      force, about November 1934------------------------------ 388, 057.91

                 Total ------------------------------------------------                                                      408, 943. 10
   Dredging is required annually for maintenance of project dimen-
sions of channel. The additional sum of $5,500 can be profitably
expended during the fiscal year ending June 30, 1936, in maintenance
operation of U. S. dipper dredge Kewaunee during May 1936.
                                                 Cost and financial summary
                                       MAINTENANCE              AND IMPROVEMENT              FUNDS

Cost of new work to June 30, 1934_---------------------------- $210, 941. 38
Cost of maintenance to June 30, 1934---------------------------102, 903. 35
            Total cost of permanent work to June 30, 1.934-                                                                  313, 844. 73

Net total expenditures----------------------------------------313, 844. 73
Unexpended balance June 30, 1934_------------------------------   8,655. 27

            Total amount appropriated to June 30, 1934----------------322, 500. 00

           Fiscal year ending June 30                             1930          1931            1932               1933                 1934


                                                  I---
Cost of new work ...-------------------------------------                                                                  -------
Cost of maintenance-------------                      -----    $12, 004. 75   $7, 660. 32   .....------------.   $7, 306. 87      $946.31

Total expended................---.......--------------------    12, 004. 75    3, 660. 32         $83. 27         5, 749. 78            2, 420. 13

Allotted---------..............----..---------------            13, 000. 00    6, 000. 00   -5, 000. 00           1, 900. 00            6, 900. 00
             RIVERS AND HARBORS-MVIILWAUKEE,                                   WIS., DISTRICT            1063
Balance unexpended July 1, 1933  ----------------------------                                       $4, 175. 40
Amount allotted from War Department Appropriation
  Act approved April 26, 1934 ---------------------- $4, 000. 00
Amount allotted from War Department Appropriation
  Act approved March 4, 1933---------------------- 3,000. 00
                                                                                                     7, 000. 00

      Amount to be accounted for      ---------------------------                                   11, 175.40
Deductions on account of revocation of allotment------------------                                      100. 00

      Net amount to be accounted for ------------------------                                       11, 075.40
Gross amount expended---------------------------- $3, 556.19
Less reimbursements collected----------------------    1, 136. 06
                                                                                                     2, 420. 13
        Balance unexpended June 30, 1934                   -----------------------                   8, 655. 27

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1------------                                                             5, 500. 00

                                     PUBLIC WORKS FUNDS

Cost of new work to June 30, 1934 ---------------------------- 197, 348.02
Cost of maintenance to June 30, 1934     --------------------------
                                        .--

      Total cost of permanent work to June 30, 1934-----------      197, 348. 02
Value of plant, materials, etc., on hand June 30, 1934-------------- 4, 594. 07

      Net total cost to June 30, 1934------------------------ 201, 942.09
Plus accounts receivable June 30, 1934                              17. 22
                                                                   7-----------------------

      Gross total costs to June 30, 1934 ---------------------- 202, 659.31
Minus accounts payable June 30, 1934------------------------     20, 885. 19

     Net total expenditures  ------------------------------- 181, 774. 12
Unexpended balance June 30, 1934_-------------------------- 408,225. 88

        Total amount appropriated to June 30, 1934--------------590, 000. 00

        Fiscal year ending June 30           1930              1931               1932      1933        1934


Cost of new work---------------------------------------------------$197,348.02
Cost ofmaintenance.----------------
Total expended------------------       -----------       ------------------------------.              181,774.12
Allotted .   .-------- --   -          .-      --    -                       .-      . - .-.
                                                                                          --.--..     6-------.-.
                                                                                                      590, 000. 00


Amount allotted from National Industrial Recovery Act approved
  June 16, 1933   ----------      -----------------------      $625, 000. 00
Deductions on account of revocation of allotment-----------__    35,000. 00
      Net amount to be accounted for--------------------                                           590, 000. 00
Gross amount expended------------------------$182,867. 29
Less reimbursements collected----------------_      1,093. 17
                                                                                                   181, 774. 12

     Balance unexpended June 30, 1934_-----------------      408, 225. 88
Amount covered by uncompleted contracts--------------------406, 302. 97

     Balance available June 30, 1934------------------------                                         1,922. 91
Accounts receivable June 30, 1934-................_                                                    717. 22
        Unobligated balance available June 30, 1934-- ..                                             2,640. 13

  ' Exclusive of available funds.
1064        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                      1934

    CONSOLIDATED COST AND FINANCIAL SUMMARY FOR PORT WASHINGTON                                      HARBOR

Cost of new work to June 30, 1934__ __________       ____                                       $408, 289.40
Cost of maintenance to June 30, 1934___ __  ____________-------                                  102, 903. 35
      Total cost of permanent work to June 30, 1934_____________                                 511, 192. 75
Value of plant, materials, etc., on hand June 30, 1934_____________                                4, 594. 07

      Net total cost to June 30, 1934_________________---------                                  515, 786. 82
Plus accounts receivable June 30, 1934__ _______________717.                                               22

      Gross total costs to June 30, 1934___________--_________                                   516, 504. 04
Minus accounts payable June 30, 1934__________________------                                      20, 885. 19

      Net total expenditures______________________________                                       495, 618. 85
Unexpended balance June 30, 1934_____________-----__-------                                      416, 881. 15

         Total amount appropriated to June 30, 1934_____________---912, 500. 00

        Fiscal year ending June 30             1930          1931           1932         1933            1934

Cost of new work .. _----- - ----
Cost of maintenance------------------....
                                            -..-.
                                            $12, 004. 75
                                                               --    . --.   ----
                                                           $7, 660. 32 ------------
                                                                                       --------
                                                                                       $7, 306. 87
                                                                                                      $197,348. 02
                                                                                                           946. 31
Total expended--------------------    __     12, 004. 75    3, 660. 32       $83. 27    5, 749. 78     184, 194. 25
Allotted-----------------------------        13, 000.00     6,000.00     -5, 000. 00    1, 900.00      596, 900.00


Balance unexpended July 1, 1933_______________-___-_-_---__                                          $4, 175.40
Amount allotted from War Department Appropria-
  tion Act approved Apr. 26, 1934_______________   $4, 000. 00
Amount allotted from War Department Appropria-
  tion Act approved Mar. 4, 1933----------------    3, 000. 00
Amount allotted from National Industrial Recovery
  Act approved June 16, 1933______________-----   625, 000.00
                                                                                                 632, 000. 00

      Amount to be accounted for__________________________                                       636, 175. 40
Deductions on account of revocation of allotment__--- ----                                        35, 100. 00

      Net amount to be accounted for______________________    601, 075. 40
Gross amount expended__                              423. 48
                                                $______________-----$86,
Less reimbursements collected                      2, 229. 23
                                                              184, 194. 25

    Balance unexpended June 30, 1934____________________-                                        416, 881. 15
Amount covered by uncompleted contracts __________________                                       406, 302. 97

     Balance available June 30, 1934______________--______                                           10, 578. 18
Accounts receivable June 30, 1934 ____________                                                           717. 22

         Unobligated balance available June 30, 1934______________                                   11, 295. 40

Amount that can be profitably expended in                      fiscal year ending
June 30, 1936, for maintenance 1_____                            ____________                        5, 500. 00

                             13. MILWAUKEE HARBOR, WIS.

  Location.-On the west shore of Lake Michigan, distant about 85
miles northerly from Chicago and about 83 miles west of Grand
Haven, Mich. (See U. S. Lake Survey Chart No. 743.)
  Previous projects.-The original project for improvement of Mil-
waukee Harbor was adopted by act of 1843. This project was modi-
   1Exclusive of available funds.
        RIVERS AND IIARBORS-MILWAUKEE,          WIS., DISTRICT    1065
fled by River and Harbor Acts of 1852, 1869, and 1899. The original
project for the harbor of refuge was adopted by River and Harbor
Act of 1881. The project of June 13, 1902, consolidating the harbor
and harbor of refuge was modified by act of 1905. The total cost
and expenditures on the harbor and harbor of refuge prior to the
commencement of the existing project in 1907, but including an ex-
penditure of $14,633.85, made under the abandoned project of 1910
for widening rivers and dredging turning basins, are $1,293,220.26
for new work, $459,305.16 for maintenance, a total of $1,752,525.42.
For further details see page 1938 of Annual Report for 1915.
   Existing project.-This provides for a north breakwater 9,961 feet
long and a south breakwater 9,671 feet, more or less, in length, ex-
tending to the shore, thereby forming a protected basin in which is
to be located a commercial harbor to be constructed by the city of
Milwaukee, the width of entrance between the two breakwaters to
be about 500 feet. It further provides for the protection of the river
mouth by two piers, 360 feet apart at the outer ends and 550 feet
apart at the shore line, 1,656 feet and 1,608 feet in length for the
north and south piers, respectively; for a channel 21 feet deep, ex-
tending from that depth in the lake to the mouth of the river, a
total length of about 2,850 feet, the width of channel outside the
piers to be 600 feet; the removal of the remaining portions of the
original south pier and of the point of land at the foot of the present
pier, so as to provide a channel width of about 500, feet at the river
mouth; and the abandonment of so much of the previous project as
related to dredging inside the shore line for the formation of turn-
ing basins and widening channels. The breakwaters are formed of
stone-filled timber cribs and concrete caissons, all of which are
capped with concrete superstructure. The inner entrance piers are
formed of concrete caissons, stone-filled timber cribs, and piling and
are also provided with concrete superstructure.
   The project depth is referred to low-water datum for Lake Michi-
gan, which is taken at 578.5 feet above mean tide level at New York.
The fluctuations of water level are seasonal changes of about one-
half foot above or below the annual mean stage and extreme fluctu-
ations of a temporary nature, due to the wind and barometric pres-
sure, of about 11/2 feet above or below the mean lake level prevailing
at the time.
   The estimate of cost for new work, revised in 1932, is $4,575,000,
exclusive of the amounts expended on previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $55,000.
   The existing project was authorized by the following river and
harbor acts: The act of August 30, 1852, provided for the north
pier (S. Doc. No. 175, 25th Cong., 2d sess.) ; the act of March 3, 1899,
provided for the 19-foot channel dimensions (H. Doc. No. 61, 54th
Cong., 2d sess.); the act of March 3, 1881, provided for the inner
7,600 feet of the breakwater (Annual Report for 1881, p. 2122); the
act of March 2, 1907, provided for the south pier (Annual Report
for 1906, p. 1752), and also provided for extending the breakwater
1,000 feet without prior survey or estimate; the act of September 22,
1922, provided for extending north breakwater, for a south break-
water, and for deepening and widening channel (H. Doc. No. 804,
66th Cong., 2d sess.). For latest published maps see House Docu-
1066   REPORT   OF CHIEF OF ENGINEERS,      U.   S. ARMY,   1934


ment No. 667, Sixty-first Congress, second session, and House Docu-
ment No. 289, Seventy-second Congress, first session.
   Supplementing the work authorized by Congress, dredging to 21
feet, a portion of the outer harbor between East Wisconsin Avenue
extended and East Bay Street extended, and easterly of a line 50 feet
lakeward of the pierhead line, as recommended by the Chief of Engi-
neers in House Document No. 289, Seventy-second Congress, first
session, has been included in the Public Works program under the
National Industrial Recovery Act.
    Recommended modifications of project.-Included in the Public
Works program.
    Local cooperation.-The work to be carried out under the Public
Works program is subject to the condition that the original dredging
be done by the city of Milwaukee, and the city of Milwaukee to be
reimbursed conditionally for original dredging done. All prior
requirements have been complied with.
    Terminal facilities.-Besides 4 car-ferry slips, there are numerous
wharves, private and municipal, used for the handling of coal, grain,
lumber, building materials, cement, salt, and miscellaneous commodi-
ties. While these facilities are considered inadequate for existing
commerce, plans for an enlarged outer harbor have been submitted
by the Milwaukee Harbor Commission.
    Operations and results during fiscal year.-Operations conducted
with regular funds consisted of placing 9,162 tons of small stone for
chinking large riprap along the breakwaters, thereby completing the
existing project, at a cost of $16,882.33. Repairs to concrete super-
structure on entrance piers and north breakwater cost $1,380.42.
Placing 2,006 tons of stone as riprap along the south breakwater cost
 $2,918.75. All work was done by hired labor and use of Government
plant. The total costs were $16,882.33 for new work, $4,299.17 for
maintenance, a total of $21,181.50. Receipts from rental of plant
owned by this project, and sale of stock exceeded the total net ex-
penditures by $50,771.28.
    There were no operations conducted on the project authorized by
the Federal Emergency Administration of Public Works during the
fiscal year.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1934 at a saving of $37,188 under the estimated cost. The
north breakwater was completed for a length of 8,210 feet in 1909
and the extension of 1,751 feet in 1925, making the total length 9,961
feet; the north pier was completed in 1905 and the south pier in
1910. The south breakwater was completed in 1929 except for plac-
ing additional riprap and repairing about 756 feet damaged by a
storm of October 22-23, 1929. Rebuilding the damaged section of
the breakwater and the placing of additional riprap was completed
in 1932. The south shore connection was completed in 1928. Dredg-
ing operations for deepening and widening entrance channel were
completed in 1930. Placing additional small stone around the cais-
son breakwaters to chink the voids in the large riprap was completed
in 1934.
    The concrete superstructures on the timber crib section of the
  north breakwater and on the harbor piers are showing considerable
  disintegration, but not to such extent as to endanger the structures.
  The controlling depth at low-water datum at the close of the fiscal
         RIVERS AND HARBORS-MILWAUKEE,                   WIS., DISTRICT       1067
year was 21.5 feet over a middle width of about 400 feet in the
entrance channel through the outer basin and 280 feet between the
inner piers. The costs of permanent work under the existing project
from regular funds are $4,537,812.20 for new work, $593,019.40 for
maintenance, a total of $5,130,831.60. The total expenditures are
$6,189,167.19.
   No work has been done under the Public Works program. Prior
to its adoption the city of Milwaukee dredged the area in the outer
harbor south of the inner-entrance piers and lakeward of the pier-
head line to more than 21 feet below datum.
   Proposedoperations.-The balance unexpended, including accounts
receivable, will be applied as follows:
Accounts payable June 30, 1934_.                                       $22, 922. 42
Maintenance:
    Operation of U. S. dipper dredge Kewaunee, about May and June
      1935      ------------------------------------               ---    6,575. 24
    Riprap breakwaters with United States plant, 7,000 tons, at
      $3.30, during the fiscal year    ----------------------_____      23, 100. 00
    Continue repairs to concrete superstructure on breakwaters and
      piers by hired labor during the fiscal year-----------            101, 000. 00
    Repairs of plant, winter 1934-35----------------------__            20, 000. 00
       Total------------------------------------                          82, 597. 66
   The unexpended balance of $25,000 from the National Industrial
Recovery Act will be applied to new-work dredging to be done in
outer harbor by the city of Milwaukee, to be paid for by the United
States at not to exceed 10 cents per cubic yard, place measure, during
the fiscal year.
   Dredging is required annually for maintenance of project dimen-
sions of channel. Additional stone is required for riprapping the
breakwaters. The additional sum of $25,000 can be profitably ex-
pended during the fiscal year ending June 30, 1936,, as follows:
Maintenance :
    Operation of U. S. dipper dredge Kewaunee, spring 1936---------$3, 500
    Riprap breakwaters, 5,000 tons, at $3.30, with United States plant
      during the fiscal year   -----------------------------------     16, 500
    Continue repairs to concrete superstructure on breakwaters and
      piers with United States plant during the fiscal year----------- 5, 000

         Total     ----------------------------------------------            25, 000

                           Cost and financial summary

                      MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934----------- ----------------        $5, 831, 032. 46
Cost of maintenance to June 30, 1934--------------------------        1, 052, 324. 56
      Total cost of permanent work to June 30, 1934 ----------        6, 883, 357. 02
Value of plant, materials, etc., on hand June 30, 1934 ----------     1, 054, 394. 22

      Net total cost to June 30', 1934-----------------------         7, 937, 751. 24
Plus accounts receivable June 30, 1934 ------------------------           26, 863. 79

      Gross total costs to June 30, 1934--------------------- 7, 964, 615. 03
Minus accounts payable June 30, 1934------------------------      22, 922 42
     Net total expenditures ---     ----------                        7, 941, 692. 61
Unexpended balance June 30, 1934 --- ---------                        - 55, 733. 87
       Total amount appropriated to June 30, 1934-.....               7, 997, 426. 48
1068        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                        1934


    Fiscal year ended June 30            1930                    1931                  1932          1933               1934


Cost of new work------------.... . $1,025,160. 93         $177, 628. 00          $174, 781. 30    $211, 220. 08        $16, 882. 33
Cost of maintenance-------------       10, 767. 14          10, 629. 07            13, 009. 34       8, 855. 44          4, 299. 17

      Total cost-----------__       1, 035, 928. 07            188, 257. 07        187, 790. 64    220, 075. 52         21, 181. 50

Total expended----------------         799, 421. 56        499, 165. 96            164, 397. 62    122, 847. 79       -50, 771. 28

Allotted --------------------- 775, 000. 00                    535, 500. 00      -80, 000. 00     -38, 386. 06       -182, 941. 70


Balance unexpended July 1, 1933__--------- -----   --------    $187, 904. 29
Deductions on account of revocation of allotment______________ 182, 941. 70

      Net amount to be accounted for-   ----
                                          ____-      ---________-                                                    4,962. 59
Gross amount expended -____ -      -__-__________    $447,276.29
Less-
    Reimbursements collected--------- $497, 719. 22
    Receipts from sales.---------------      328. 35
                                                       498, 047. 57
                                                                                                                  -50, 771. 28

      Balance unexpended June 30, 1934__                                      -______--------          __           55, 733. 87
Outstanding liabilities June 30, 1934__                                       ----------                            72, 962. 85

      Balance available June 30, 1934__-------------------                                                        -- 17, 228. 98
Accounts receivable June 30, 1934_ ----------------------------                                                      26, 863. 79

         Unobligated balance available June 30, 1934___________                                                      9,634. 81

Amount that can be profitably expended in fiscal year- - ending     June
                            1- - -- -- -- -- -- -- - -- -- -- -- -- -- --
30, 1936, for maintenance __                                                                                       25, 000. 00

                                         PUTBLIO WORKS FUNDS

Cost of new work to June 30, 1934      _________________                                                          --------
Cost of maintenance to June 30, 1934__._________

      Net total expenditures___                                                                                   -----------
Unexpended balance June 30, 1934_______-----------------------                                                     $25, 000. 00
                                                     --
Total amount appropriated to June 30, 1934----__ __________                                                         25, 000. 00

    Fiscal year ending June 30            1930                   1931                  1932           1933               1934

Cost of new work _------------           -            ------
Cost of maintenance----------------------                                       --------------                            -

Total expended---------------------------------------------
Allotted------------------------------------------- --------------------                          -------------        $25, 000. 00


Amount allotted from National Industrial Recovery Act, approved
    June 16, 1933                                        ------                    ------------                     $25, 000. 00
Balance unexpended June 30, 1934______-------- -------                                                              25, 000. 00

Amount (estimated) required to be appropriated for completion of
  Public Works Administration project________________________                                                      100, 000. 00

    1Exclusive of available funds.
                RIVERS AND HARBORS-MILWAUKEE,                                            WIS., DISTRICT                1069
        CONSOLIDATED COST AND FINANCTAL STJMMARY FOR MILWAUKEIS                                              HARBOR

Cost of new work to June 30, 1934------------------------$5, 831, 032. 46
Cost of maintenance to June 30, 1934 ------------------------- 1, 052, 324. 56
      Total cost of permanent work to June 30, 1934---------
Value of plant, materials, etc., on hand June 30, 1934----------
                                                                                                            6,1, 883, 357. 02
                                                                                                                 054, 394. 2,2
      Net total cost to June 30, 1934---------------------- 7, 937, 751. 24
Plus accounts receivable June 30, 1934------------------------  26, 863. 79
     Gross total costs to June 30, 1934---------------------                                                7, 964, 615. 03
Minus accounts payable June 30, 1934   ------------------                                                       22, 922. 42

     Net total expenditures ----------------------------- 7, 941, 692. 61
Unexpended balance June 30, 1934--------8-------------------   0, 733. 87
          Total amount appropriated to, June 30, 1934                                                        , 022, 426. 48
                                                                                                            8------------

    Fiscal year ending June 30                      1930            1931            1932            1933              1934


Cost of new work ...............              $1, 025,160. 93    $177, 628. 00   $174, 781.30    $211, 220. 08       $16, 882. 33
Cost of maintenance ...........           _        10, 767. 14     10, 629. 07     13, 009. 34      8, 855. 44         4, 299. 17
       Total cost----------------              1, 035, 928. 07    188, 257. 07    187, 790. 64    220, 075. 52        21, 181. 50
Total expended _                                 799, 421. 56    499, 165. 96     164, 397. 62    122, 847. 79      -50, 771. 28
Allotted---------_ _......         -- _        -775, 000. 00     535, 500. 00    -80, 000. 00    -38, 386. 06      -157, 941. 70


Balance unexpended July 1, 1933            --------------------------- $187, 904. 29
Amount allotted from National Industrial Recovery Act approved
  June 16, 1933_ ------------------------------------------              25, 000. 00
     Amount to be accounted for--------------------------                                                        212, 904. 29
Deductions on account of revocation of allotment--------------                                                   182, 941. 70

       Net amount to be accounted for-------------------------29,                                                     962.59
Gross amount expended------------------------ $447, 276.29
Less :
    Reimbursements collected--------- $497, 719. 22
    Receipts from sales ----------------             328. 35
                                                                  498, 047. 57
                                                                                                             --50, 771. 28
      [Balance unexpended June 30, 1934--------------------                                                      80, 733.87
Outstanding liabilities June 30, 1934-------------------------                                                   72, 962. 85
      Balance available June 30, 1934------------------------  7, 771. 02
Accounts receivable June 30, 1934----------------------------26, 863. 79

          Unobligated balance available June 30, 1934---------------34, 634. 81

Amount (estimated) required to be appropriated for completion
of Public Works Administration project 1------------------- 100, 000. 00

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1--------------------------------                                                     25, 000. 00

  ' Exclusive of available funds.
1070   REPORT OF CHIEF OF ENGINEERS,        U.   S.   ARMY,   1934

                      14. RACINE HARBOR, WIS.

    Location.-On the west shore of Lake Michigan, distant about
26 miles southerly from Milwaukee and about 64 miles northerly
from Chicago. (See U. S. Lake Survey Chart No. 745.)
    Previous project.-The original project was adopted by the citizens
of Racine about 1842 or 1843. The citizens' project was modified
by acts of 1866, 1899, and 1902. The cost and expenditures by the
United States prior to the commencement of the existing project in
1907 are $427,239.97 for new work, $79,536.95 for maintenance, a
total of $506,776.92. For further details see page 1939 of Annual
Report for 1915.
    Existing project.-This provides for two breakwaters extending
from the shore on either side of the mouth of Root River, 2,640 feet
and 2,652 feet in length for the north and south breakwaters, respec-
tively, and for a channel varying in width from 650 feet at the outer
end to 200 feet at the river mouth, 19 feet deep; this channel extends
from that depth in, the lake a distance of 2,300 feet to the mouth
of the river. The breakwaters are formed of stone-filled timber
cribs, concrete caissons, and piling, all being capped with concrete
superstructure.
    The project depth is referred to low-water datum for Lake Michi-
gan, which is taken at 578.5 feet above mean tide level at New York.
The fluctuations of water level are seasonal changes of about one-half
foot above or below the annual mean stage, and extreme fluctuations
of a temporary nature, due to wind and barometric pressure, of
about 11/2 feet above or below the mean lake level prevailing at the
time.
    The latest revised estimate (1920) for the new work under existing
project was $703,200, exclusive of inner 300 linear feet of pile pier
and 450 linear feet of rubble mound, no longer considered necessary.
The latest (1928) approved estimate for annual cost of maintenance
is $10,000.
    The existing project was adopted by the River and Harbor Act of
March 2, 1907 (H. Doc. No. 62, 59th Cong., 1st sess.), and modified
by the River and Harbor Act of June 25, 1910 (Annual Report for
1909, p. 1973). (For latest published map see Annual Report for
1914, p. 2906.)
    Terminal facilities.-These consist of 5 coal wharves, 1 package-
freight wharf, 1 lumber wharf, and 2 fishing' wharves. While these
facilities are considered generally adequate for existing commerce,
there should be a publicly owned or controlled wharf with railroad
and terminal facilities, open to all on equal terms.
    Operations and results during fiscal year.-Operations consisted
of dredging 42,500 cubic yards for restoration of project depth at a
cost of $4,725.03. Placing 991 tons of stone for riprap along the
south breakwater cost $2,253.35. All work was done by hired labor
and use of Government plant. The total cost was $6,978.38 for main-
tenance. The total net expenditures were $11,934.30.
    Condition at end of fiscal year.-The existing project was sub-
stantially completed in 1924 at a saving of $50,180 under the esti-
             RIVERS AND HARBORS-MILWAUKEE,                                     WIS., DISTRICT            1071
mated cost. The concrete superstructure on north breakwater and
shore connection is showing considerable disintegration, but not to
such an extent as to endanger the structures. The south breakwater
and shore connection are in good condition, except that the break-
water needs riprapping. The controlling depth at low-water datum
at the close of the fiscal year was 19 feet over the full width of the
entrance channel through the outer harbor. The costs of permanent
work under the existing project are $653,020.04 for new work and
 $241,132.22 for maintenance, a total of $894,152.26. The total
expenditures are $894,439.72.
   Proposed operations.-Thebalance unexpended, including accounts
receivable, will be applied as follows:
Accounts payable June 30, 1934_------------------------------- $119.                                           20
Maintenance:
    Operation of U. S. dipper dredge Kewawnee, May 195--------- 10,, 731.                                      85
    Large riprap for breakwaters, with United States plant, 1,000
      tons, at $4.25, during the fiscal year__----------------------4,    250.                                 00
    Minor repairs to breakwaters and piers by hired labor during the
      fiscal year    ------------------------------------------        2, 000.                                 00
           Total            -------------------------------                                         17, 101.05
   Dredging is required annually for maintenance of project dimen-
sions of channel. The additional sum of $10,000 can be profitably
expended during the fiscal year ending June 30, 1936, as follows:
Maintenance :
   Operation of U. S. dipper dredge Kewaunee, spring, 1936------- $8, 800. 00
   Minor repairs to piers and revetments with United States plant
      during the fiscal year__                 _----------------------------------, 200.00
           Total--                                                                                      000. 00,
                                                                                                    1-----------------------------
                                    Cost and fianacl sumznary

Cost of new work to June 30, 1934___------------------------$1, 080, 260. 01
Cost of maintenance to June 30, 1934-----------------------     320, 669. 17
      Total cost of permanent work to June 30, 1934-----------1, 400, 929. 18
Plus accounts receivable June 30, 1934 ------------------------       406. 66

      Gross total costs to June 30, 1934-------------------- 1, 401, 335. 84
Minus accounts payable June 30, 1934-------------------------        119. 20.

     Net total expenditures-------------------------------- 1, 401, 216. 64
Unexpended balance June 30, 1934---------------------------     16, 694. 39

        Total amount appropriated to June 30, 1934 -------------                               1, 417, 911. 03:

   Fiscal year ending June 30            1930             1931          1932           1933             1934


                 .
Cost of new work-------------
Cost of maintenance-------------        $8,167. 38      $13, 752. 78   $8,264. 56    $10, 045. 20      $6, 978. 38

Total expended-----------------          9, 273. 87      13, 079. 07    7, 827. 45     5,133.52        11,934. 30'

Allotted------ --------------           14, 000. 00      22, 500. 00   -5, 700. 00     3, 830. 24      18, 500. 00




       91536-ENG 1934-             68
1072     REPORT OF        CHIEF OF ENGINEERS,       U.    S.   ARMY,   1934

Balance unexpended July 1, 1933 ---               --------              $10, 128.69
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934_____________..---___           $13, 000. 00
Amount allotted from War Department Appropriation
Act approved July 14, 1932_-______- ______------__-         3,500. 00
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933---------------------------       2, 000. 00
                                                                         18, 500. 00
      Amount to be accounted for__ __________________--_-_----28, 628.69
Gross amount expended ______________________________ $17,265.95
Less reimbursements collected______________-------__   5,331. 65
                                                                 11, 934. 30
      Balance unexpended June 30, 1934_________--------                   16, 694. 39
Outstanding liabilities June 30, 1934____       ______                        119. 20

      Balance available June 30, 1934__________                           16, 575. 19
Accounts receivable June 30, 1934_ ___________________                        406. 66

       Unobligated balance available June 30, 1934__ _______------16, 981. 85
Amount that can be profitably expended in fiscal year ending June
  30, 1936, for maintenance 1_____       ________                         10, 000. 00

                           15. KENOSHA    HARBOR, WIS.

   Location.--On the west shore of Lake Michigan, distant about 35
miles southerly from Milwaukee and about 54 miles northerly from
Chicago. (See U. S. Lake Survey Chart No. 747.)
   Previous projects.-The original project was adopted by the River
and Harbor Act of August 30, 1852. This project was modified by
subsequent river and harbor acts, as follows: June 23, 1866, Septem-
ber 19, 1890, March 3, 1899, and June 13, 1902. Total cost and ex-
penditures prior to commencement of the existing project in 1907 are
$453,839.49 for new work, $21,818.17 for maintenance, a total of
$475,657.66. For further details see page 1939 of Annual Report for
1915.
   Existing project.-This provides for a detached breakwater 800
feet long, for two parallel piers about 250 feet apart, 1,077 and 1,872
feet in length for the north and south piers, respectively, and for a
channel 200 feet wide, 19 feet deep; this channel extends from that
depth in the lake a distance of 2,350 feet to an interior basin 18
feet deep. The breakwater is formed of stone-filled cribs; the piers
are formed of stone-filled cribs and piling. The entire north pier,
1,175 feet of the south pier, and the entire breakwater are" capped
with concrete superstructure.
   The project depths are referred to low-water datum for Lake
Michigan, which is taken at 578.5 feet above mean tide level at New
York. The fluctuations of water level are seasonal changes of about
one-half foot above or below the annual mean stage, and extreme
fluctuations of a temporary nature, due to wind and barometric
pressure, of about 11/2 feet above or below the mean lake level pre-
vailing at the time.
  1Exclusive   of available funds.
        RIVERS AND     HARBORS-MILWAUKEE,            WIS.,   DISTRICT     1073
   The estimate of cost for new work, made in 1906, was $35,000,
exclusive of amounts expended on previous projects. The latest
(1928) approved estimate for annual cost of maintenance is $9,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1899, provided for the parallel
piers, for 600 feet of breakwater, and for the present channel and
basin dimensions (H. Doc. No. 328, 54th Cong., 2d sess., and H. Doc.
No. 164, 55th Cong., 3d sess.) ; the act of March 2, 1907, provided for
extending the breakwater 200 feet (HI. Doc. No. 62, 59th Cong., 1st
sess., and Rivers and Harbors Committee Doc. No. 3, 59th Cong., 2d
sess.). For latest published maps see Annual Report for 1903, page
1863.
   Terminal facilities.-There are six wharves used for handling
coal, sand, gravel, stone, automobiles, fish, and miscellaneous com-
niodities. While these facilities are considered generally adequate
for existing commerce, more efficient use of existing terminals and
utilization of available frontage for development of additional ter-
minals should be made.
   Operations and results during fiscal year.-Operations consisted
of dredging 52,000 cubic yards for restoration of project depth at a
cost of $6,186.14. Placing 999 tons of stone for pier filling and
riprap cost $1,496. Minor repairs to piers cost $73.40. Rebuilding
the superstructure, in concrete, on 1,095.6 linear feet of the south
pier by contract cost $37,700.90. All work, except the rebuilding of
superstructure on the south pier, was done by hired labor and use of
Government plant. The total cost was $45,456.44 for maintenance.
The total net expenditures were $46,944.43.
   Condition at end of fiscal year.--The existing project was com-
pleted in 1909. The north pier was completed in 1895, the south
pier and dredging in 1900, and the breakwater in 1909. The con-
trolling depths at low-water datum at the close of the fiscal year were
19 feet in the entrance channel between the piers and 18 feet over
practically the entire inner basin. The costs of permanent work
under the existing project are $40,553.04 for new work, $307,760.62
for maintenance, a total of $348,313.66. The total expenditures are
'$347,808.54.
   Proposed operations.-The balance unexpended, including ac-
counts receivable, will be applied as follows:
Accounts payable June 30, 1934________________                          $632.01
Maintenance:
    Operation of U. S. dipper dredge Meade, April 1935 and April
      1936 ------        ------------------------------------       15, 562. 43
    Minor repairs to piers and revetments by hired labor during the
      fiscal years 1935 and 1936-----------------------___              5,000. 00
    Riprap breakwater, 1,000 tons at $3.75, with United States plant,
      September 1935-------------         -------------------------     3, 750. 00
      Total ------------------------------------------         24,944. 44
  It is estimated that funds available will suffice for ordinary main-
tenance operations during the fiscal year 1936 and that no additional
funds will be required.
1074         REPORT OF CHIEF OF ENGINEERS,                             U. S. ARMY,               19 3 4

                                      Cost and finanoial summary

Cost of new work to June 30, 1934------------------------$494, 392.53
Cost of maintenance to June 30, 1934------------------------329, 578. 79
      Total cost of permanent work to June 30, 1934------------823,                                         971. 32
Plus accounts receivable June 30, 1934--------------------------                                            126. 89

      Gross total costs to June 30, 1934--------------------- 824. 098. 21
Minus accounts payable June 30, 1934---------------------------    632. 01

      Net total expenditures ------------------------------                                            823, 466. 20
Unexpended balance June 30, 1934--------------------------                                              24, 817. 55

           Total amount appropriated to June 30, 1934------------                                      848, 283. 75

   Fiscal year ending June 30            1930             1931           1932             1933              1934


Cost of new work  ---..---      ----.------------     ----------------------- --         ----- --       -------
Cost of maintenance-.............     $30, 962. 03       $4, 889. 48    $5, 937.63       $4, 044. 66      $45, 456. 44

Total expended .-                 _     30, 962. 03       4, 889. 48     1, 697. 64       6, 291. 54        46, 944. 43

Allotted                                33, 600. 00       4, 000. 00   -5, 000. 00        -150. 00          71, 761. 98


Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934      ------------------------------------------ $6, 00. 00
Amount allotted from War Department Appropriation Act approved
July 14, 1932---                                                 18, 000. 00
                          -----------------------------------------
Amount allotted from War Department Appropriation Act approved
Mar. 4, 1933     -------     --------------------------------    67, 861. 98

     Amount to be accounted for__________________________        _ 91, 861. 98
Deductions on account of revocation of allotment ----------------- 20, 100. 00

      Net amount to be accounted for __-__--_____                                  -____-__- _ 71, 761. 98
Gross amount expended ---------------------------                                   $46, 952. 01
Less reimbursements collected ------------ -------                              ------     7. 58
                                                                                                 46, 944. 43
      Balance unexpended June 30, 1934 _______-___--                                                24, 817. 55
                                                                                              -_______
Outstanding liabilities June 30, 1934__.1111111 111111___1                                    1      1, 019. 50

     Balance available June 30, 1934__ ---                  __--____ 23, 798. 05
Accounts receivable June 30, 1934_ ....---...___-...........__    ..     126. 89

           Unobligated balance available June 30, 1934 __                             -_________23, 924.94

                              16. ST. JOSEPH HARBOR, MICH.

   Location.-Located on the east shore of Lake Michigan, distant
about 60 miles easterly from Chicago and about 24 miles southerly
from South Haven. (See U. S. Lake Survey Chart No. 758.)
   Previous project.-The original project was adopted by the act
approved July 4, 1836, and was modified by the River and Harbor
Acts of 1866, 1875, 1880, and 1892. The cost and expenditures there-
under, prior to beginning work under the existing project in 1900,,
were $503,113.23 for maintenance and new work. .(For further
details see p. 1945 of Annual Report for 1915.)
   Existing project.-This provides for protecting the mouth of the
St. Joseph River by two timber crib and pile piers and revetments,
        RIVERS AND HARBORS-        ILWAUKEE,     WIS., DISTRICT    1075
250 to 325 feet apart at their inner and outer ends, respectively, hav-
ing lengths of 2,854 feet on the north side and 2,603 feet on the south
side; for an entrance channel 18 feet deep; for a channel 18 feet
deep, 150 feet wide in the St. Joseph River, 3,500 feet along the city
front, including a turning basin; and for a canal 15 feet deep, 100
feet wide, and 4,700 feet long, extending to Benton Harbor. The
entire south pier and the entire north pier and revetment have been
repaired with concrete superstructure, and 500 feet of the south
revetment has been repaired with rubble superstructure.
   The project depths are referred to low-water datum for Lake Mich-
igan, which is taken at 578.5 feet above mean tide level at New York.
   The fluctuations of water level are seasonal changes of about one-
half foot above or below the annual mean stage, and extreme fluctua-
tions of a temporary nature, due to wind and barometric pressure,
of about 11/2 feet above or below the mean lake level prevailing at
the time.
   The estimate of cost for new work, made in 1897, was $380,000, ex-
clusive of amounts expended on previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $17,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1875, provided for interior revet-
ment (H. Ex. Doc. No. 160, 43d Cong., 2d sess.) ; the act of June 14,
1880, provided for the Benton Harbor Canal (Annual Report for
1880, pp. 2030, 2031, and 2049 to 2055) ; and the act of March 3, 1899,
provided for the present dimensions of the piers and the remaining
features of the existing project (H. Doc. No. 307, 55th Cong., 2d
sess., and Annual Report for 1898, p. 2496). The latest published
complete map is in the last-mentioned document.
   Terminal facilities.-There is a package freight terminal con-
nected with the electric-railway line. There are several privately
owned wharves connected with steam-railway lines, which are open
to general use. Except for a few street ends there are no publicly
owned wharves. While these facilities are generally adequate for
existing traffic conditions, a public wharf open to all on equal terms
should be acquired.
   Operationsand results during fiscal year.-Operationsconsisted of
dredging 118,487 cubic yards for restoration of project depth at a
cost of $15,799:67. The placing of 947 tons of stone as riprap and
making minor repairs to piers and revetments cost $1,762.50. The
superstructure on the outer 1,348.5 linear feet of south pier was rebuilt
in concrete, by contract, at a cost of $61,233.45. All work, except
the rebuilding of superstructure on the south pier, was done by hired
labor and use of Government plant. The total cost was $78,795.62
for maintenance. The total net expenditures were $77,924.93.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1907 at a saving of $76,906 under the estimated cost. Pier
construction was completed in 1904 and dredging in 1907. The con-
trolling depths below low-water datum at the close of the fiscal year
were 21 feet over entrance bar, 18 feet in the channel to Benton
Harbor Canal, and 17 feet in a narrow, winding channel in Benton
Harbor Canal. The costs of permanent work under the existing
project are $303,093.38 for new work and $573,997.52 for maintenance,
a total of $877,090.90. The total expenditures are $875,896.74.
1076        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                            1934

   Proposed operations.--Thebalance unexpended, including accounts
receivable, will be applied as follows:
Accounts payable June 30, 1934---------------------             $1, 238.99
Maintenance:
    Operation of U. S. hopper dredge Meade, April-May, 1935 and
        April-May,         1936 -__                                                                    27, 853. 45

            Total---- ---------------------------------------------                                    29, 092.44
  It is estimated that funds available will suffice for ordinary main-
tenance operations during the fiscal year 1936 and that no additional
funds will be required.
                                       Cost and financial summary
Cost of new work to June 30, 1934-----------------------------$806, 206. 61
Cost of maintenance to June 30, 1934--------------------------   573, 997. 52
      Total cost of permanent work to June 30, 1934------------  , 380, 204. 13
Plus accounts receivable June 30, 1934--------------------------         44. 83
     Gross total costs to June 30, 1934------------------------                                   1, 380, 248. 96
Minus accounts payable June 30, 1934                                                                     , 238. 99
                                                                                                       1-------------------------

     Net total expenditures---------------------------------1, 379, 009. 97
Unexpended balance June 30, 1934                                29, 047. 61

         Total amount appropriated to June 30, 1934--                                             1, 408, 057. 58

    Fiscal year ending June 30             1930             1931           1932           1933              1934


Cost of new work------ -         ----------------      ------------      ------ -------      -------------
Cost of maintenance. . .....            $18, 606. 16     $35, 460. 56   $70, 544. 50    $18, 587. 98     $78, 795. 62

Total expended-..............      .     12, 097. 91      39, 155. 12    69, 511. 34     21, 955. 96        77, 924. 93
Allotted ... _..   .   .                   5,100. 00     147, 000. 00   -33, 000. 00      4, 850. 00       101, 700. 00


Balance unexpended July 1, 1933                                                                              272. 54
                                                                                                        $-----------$5,
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934------- ----------        $11, 000. 00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933--------------------------91, 000. 00
                                                                                                       102, 000. 00

      Amount to be accounted for -..                                                                   107, 272. 54
Deductions on account of revocation of allotment ..--..                                                     300. 00

      Net amount to be accounted for--------------------------- 06, 972. 54
Gross amount expended     _                             78, 243.08
                                                       $-------------------
Less reimbursements collected ------------------------      318. 15
                                                                    77, 924. 93

     Balance unexpended June 30, 1934--------------------------                                         29, 047. 61
Oustanding liabilities June 30, 1934--------------------    $42. 61
Amount covered by uncompleted contracts------------      1, 196. 38
                                                                                                         1, 238. 99

      Balance available June 30, 1934----------------------------                                       27, 808. 62
Accounts receivable June 30, 1934__
                                 --------------------------------                                            44. 83

         Unobligated balance available June 30, 1934                                                    27, 853. 45
        RIVERS AND HARBORS-MILWAUKEE,          WIS., DISTRICT    1077
                 17. SOUTH HAVEN HARBOR, MICH.

   Location.-Located on the east shore of Lake Michigan, distant
about 77 miles northeasterly from Chicago and about 24 miles north-
erly from St. Joseph. (See U. S. Lake Survey Chart No. 76.)
   Previous projects.-The original project was adopted by the River
and Harbor Act approved March 2, 1867, and was modified by the
River and Harbor Acts approved June 14, 1880, August 2, 1882, and
August 11, 1888. The cost and expenditures thereon prior to begin-
ning work under the existing project in 1911 were $318,472.25, of
which $187,232.83 was for new work and $131,239.42 was for main-
tenance. (For further details see p. 1947 of Annual Report for
1915.)
   Existing project.-This provides for protecting the mouth of Black
River by two piers and revetments, 200 to 170 feet apart, with
lengths of 2,143 feet and 2,182 feet for the north and south sides,
respectively; for an entrance channel 19 feet deep and 120 feet wide
to the mouth of the river; thence a channel 17 feet deep and 90 feet
wide extending up the river to a turning basin, 300 feet wide, located
immediately below the bridge. The length of channel between en-
trance piers is 2,200 feet and in the river to the bridge 2,600 feet, a
total length of 4,800 feet. The piers and revetments are formed of
timber cribs and piling. The piers and revetments are capped with
concrete except for the outer 400 feet on both piers and 1,160 feet at
inner ends of the revetments.
   The project depths are referred to low-water datum for Lake
Michigan, which is taken at 578.5 feet above mean tide level at New
York.
   The fluctuations of water level are seasonal changes of about one-
half foot above or below the annual mean stage, and extreme fluctua-
tions of a temporary nature, due to wind and barometric pressure
of about 11/2 feet above or below the mean lake level prevailing at
the time.
   The estimate of cost of new work made in 1903 was $279,370, ex-
clusive of the amounts expended on previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $15,000.
   The existing project was authorized by the following river and
harbor acts: The act of August 11, 1888, provided for the channel
from the inner end of the piers to the highway bridge, and the act
of March 3, 1905, provided for the remaining features of the existing
project (H. Doc. No. 119, 58th Cong., 2d sess.).
   The latest published maps are in the last-mentioned document and
in Rivers and Harbors Committee Document No. 9, Seventy-third
Congress, first session.
   Recommended modifcations of project.-Under date of May 24,
1933, the Chief of Engineers recommended modification of the exist-
ing project so as to provide an entrance channel 21 feet deep and 130
feet wide from deep water in Lake Michigan to the shore line, thence
a channel of the same width and 19 feet deep to the Dyckman Avenue
Bridge, and enlargement of the existing turning basin to a width of
375 feet and a depth of 19 feet, all at an estimated cost of $67,500
with $2,000 annually for maintenance in addition to that now re-
quired, subject to certain conditions of local cooperation (Rivers and
Harbors Committee Doc. No. 9, 73d Cong., 1st sess.).
1078            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                        1934

   Local cooperation.-Fully complied with.
   Terminal facilities.-There are several privately owned wharves,
in poor condition, with railroad connection, which are open to gen-
eral use. The city has constructed a municipal wharf and warehouse
which is open to the general public on like terms for like service.
These facilities are considered adequate for the existing commerce.
   Operations and results during fiscal year.-Operations consisted of
dredging 132,926 cubic yards for restoration of project depth at a
cost of $18,580.24. Minor repairs to piers and revetments cost $5.62.
All work was done by hired labor and use of Government plant.
The total cost was $18,585.86 for maintenance. The total net ex-
penditures were $18,672.91.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1913, at a saving of $117,351 under the estimated cost. The
dredging was completed in 1912 and the extensions to the piers in
1913. The remaining timber superstructures are generally in poor
condition. The controlling depths below low-water datum at the
close of the fiscal year were 20 feet on the entrance bar, 18 feet in the
channel between the piers, and 17 feet in the river. The costs of
permanent work under the existing project are $162,018.74 for new
work and $382,454.97 for maintenance, a total of $544,473.71. The
total expenditures are $544,461.71.
   Proposed operations.-The balance unexpended will be applied as
follows :
Accounts payable June 30, 1934--------------------------------$12.       00
Maintenance:
    Operation of U. S. hopper dredge Meade, April 1935----------10, 687. 01
    Minor repairs to piers and revetments by hired labor during the
      fiscal year-------------------------------------------        700.00

                Total-------------------------------------------                                                          11, 399. 01
   Dredging is required annually for maintenance of project dimen-
sions of channel. The additional sum of $13,000 can be profitably
expended during the fiscal year ending June 30, 1936, in maintenance
operation of U. S. hopper dredge Meade during April and June 1936.
                                                       Cost and financital summary

Cost of new work to June 30, 1934__--------------------------  $349, 251. 57
Cost of maintenance to June 30, 1934------------------------513,     694. 39
     Total cost of permanent work to June 30, 1934------------862, 945. 96
Minus accounts payable June 30, 1934--------------------------      12. 00

     Net total expenditures-- -----------------------       ----                                                       862, 933. 96
Unexpended balance June 30, 1934___---------------------------                                                          11, 399. 01
          Total amount appropriated to June 30, 1934                                                                         332. 97
                                                                                                                       8---------------74,

          Fiscal year ending June 30                                 1930         1931           1932           1933          1934


Cost   of new   work....--------------------------------
Cost of maintenance-----------.....                    -------   $16, 773. 21   49, 314. 74   $38, 590. 75   $12,956.92     $18, 585. 86

Total expended....--------------------------                      12,850.88     55,554.21      36,256.29      12,875.19      18,672.91
Allotted.---------------------------- 87, 500. 00                                7,000.00 -4,000.00           10,850.00      28, 521. 33
          RIVERS AND HARBORS-MILWAUKEE,                   WIS.,        DISTRICT        1079
Balance unexpended July 1, 1933----------------------                      $1, 550. 59
Amount allotted from War Department Appropriation Act
  approved Apr. 26, 1934________________________________ $7, 000. 00
Amount allotted from War Department Appropriation Act
  approved Mar. 4, 1933_________________           ___________ 22, 000. 00
                                                                           29, 000. 00

     Amount to be accounted for__-- -___----                                -- - 30, 550. 59
                                                                         __ -__
Deductions on account of revocation of allotment                                     478. 67
      Net amount to be accounted for------ -------------                        __ 30, 071. 92
Gross amount expended-----------------------                                       18, 672. 91

      Balance unexpended June 30, 1934_.....____             ---------             11, 399. 01
Outstanding liabilities June 30, 1934 -----------       -------------                   15. 50

       Balance available June 30, 1934 .----           ___----------        -      11,383.51
Amount that can be profitably expended in fiscal year ending June
                                    _
30, 1936, for maintenance 1---  __   -       -___-______         13, 000. 00

       18. SAUGATUCK HARBOR AND KALAMAZOO RIVER, MICH.
  Location.-Located on the east shore of Lake Michigan, distant
about 90 miles northeasterly from Chicago and about 22 miles north-
erly from South Haven. (See U. S. Lake Survey Chart No. 76.)
  Previous projects.-The original project was adopted by the act
of 1868, and was modified by the act of 1870. The cost and expendi-
tures thereon prior to the commencement of work under the existing
project in 1904 were $207,785.92, of which $90,231.99 was for new
work and $117,553.93 for maintenance. For further details see page
1947 of Annual Report for 1915.
   Existing project.-This provides for an entrance channel between
parallel piers, 200 feet apart, having lengths of 2,778 feet and 2,514
feet for the north and south piers, respectively, and for a chaniel 16
feet deep, extending from that depth in Lake Michigan to the mouth
of the river, thence 14 feet deep, 90 feet wide in the Kalamazoo River
up to Saugatuck, a distance of 9,700 feet: this channel to be main-
tained until November 1916. The piers are formed of timber cribs
and piling.
    The project depths are referred to low-water datum for Lake
Michigan, which is taken at 578.5 feet above mean tide level at New
York. The fluctuations of water level are seasonal changes of about
one-half foot above or below the annual mean stage and extreme
fluctuations of a temporary nature, due to vind and barometric pres-
sure, of about 11/2 feet above or below the mean lake level prevailing
at the time.
   .The estimate of cost for new work, revised in 1910, was $286,000,
exclusive of the amount expended on previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $9,000.
    The existing project was adopted by the following river and har-
bor acts: The act of June 3, 1896, provided for the entrance channel
 (H. Doc. No. 192, 54th Cong., 1st sess.); the act of March 2, 1907,
provided for deepening the entrance to 16 feet; and the act of June
25, 1910, provided for the depth of 14 feet in the river (H. Doc. No.
635, 61st Cong, 2d sess.). The latest published map is in House
Document No. p08, Sixty-fourth Congress, first session.
  1Exclusive   of available funds.
1080            REPORT OF              CHIEF OF ENGINEERS,                           U.   S.     ARMY,         1934

   Recommended modifications of project.-Legislation authorizing
the abandonment of the project has been recommended in House
Document No. 292, Sixty-fifth Congress, first session.
   Terminal facilities.-At the village of Saugatuck there are several
landing places for small steamboats and one for translake boats.
At the village of Douglas there is a steamboat pier. The terminal
facilities are available for general use and are considered adequate
for the existing commerce.
   Operations and results during fiscal year.-Operations consisted
of dredging 55,653 cubic yards, by hired labor and use of Govern-
ment plant, for restoration of project depth at a cost of $5,000 for
maintenance. The total net expenditures were $5,000.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1911 at a saving of $11,705 under the estimated cost. Pier
construction and dredging between the piers was completed in 1908;
dredging in the river was completed in 1911. The superstructure
on the outer 100 feet of each pier was repaired in 1928 and additional
portions were repaired in 1932 and 1933; the condition of the re-
maining timber superstructure on the piers and revetments is poor.
The controlling depths below low-water datum at the close of the
fiscal year were 15.5 feet on the entrance bar and 14 feet in the chan-
nel between the piers to the river. The costs of permanent work
under the existing project are $274,294.80 for new work and $153,-
546.04 for maintenance, a total of $427,840.84. The total expendi-
tures are $427,840.84.
   Proposed operations.-No operations are proposed, no funds being
available, and none can be profitably expended during the fiscal
year ending June 30, 1936.
                                           Cost and financial summary

Cost of new work to June 30, 1934                                       ----------                                $364, 526. 79
Cost of maintenance to June 30, 1934__                                                                             271, 099. 97
            Total cost of permanent work to June 30, 1934-------------                                             635, 626. 76

Net total expenditures_-----------------                                                                           635, 626. 76
Total amount appropriated to June 30, 1934 ------------------                                              _       635, 626. 76

            Fiscal year ending June 30                     1930              1931              1932        1933         1934


Cost of new work ---------------------------------                               I------ ----------------------
                                                                              ------
Cost of maintenance ----------------------                 $419.64       $122.96          $4, 123. 96   $11, 563.80    $5,000.00
Total expended             --------------------------       419. 64           122. 96      4,123. 96     11, 563. 80    5, 000. 00
Allotted -------------------------                  ----------------
                                                                   --....-                20, 000. 00   -4, 312. 24     5, 000. 00


Amount allotted from War Department Appropriation Act approved
July 14, 1932-------------------------------------------      $5, 000
Gross amount expended_-------                                                                                            5, 000

                                       19. HOLLAND HARBOR, MICH.

   Location.-Located on the east shore of Lake Michigan distant
about 95 miles northeasterly from Chicago, and about 23 miles south-
erly from Grand Haven. (See U. S. Lake Survey Chart No. 763.)
        RIVERS AND HIARBORS-MILWAUKEE,          WIS.,   DISTRICT   1081
    Previous project.-The original project was adopted by the River
and Harbor Act of 1852, and was modified by the River and Harbor
Acts of 1866, 1873, 1879, 1884, and 1892. The cost and expenditures
thereunder prior to the commencement of work under the exist-
ing project in 1899 were $304,217.30, $176,619.80 for new work and
:$127,597.50 for maintenance. For further details see page 1948 of
Annual Report for 1915.
    Existing project.-This provides for protecting the outlet of the
channel from Black Lake by extending the converging entrance piers
to shore, the extensions for the north and south piers being 500 and
700 feet, respectively, making the total length of the north pier
1,250 feet and that of the south pier 1,500 feet, the distance between
them being 300 feet at the outer end and 950 feet at the shore line; for
removing the existing pile pier connections between the entrance
:and the inner piers; for inner piers along the channel from Black
iake about 180 feet apart, 1,755 feet and 1,639 feet long for the
north and south piers, respectively; and for dredging a channel 20
feet deep from that depth in Lake Michigan to the shore line and
thence 18 feet deep and 150 feet wide to the wharves at the city of
Holland, with a turning basin of the same depth and 400 feet wide
at the inner end. The total length of the dredged channel at the
harbor entrance is 3,000 feet and that of the channel in the upper
part of Black Lake is 11,200 feet, the total distance from the outer
end of the channel to the wharves at Holland being 5.4 miles. The
piers and revetments are built of timber cribs and piling, all of
which are capped with concrete superstructure.
    The project depths are referred to low-water datum for Lake
IMichigan, which is taken at 578.5 feet above mean tide level at
New York. The fluctuations of water level are seasonal changes of
about one-half foot above or below the annual mean stage, and ex-
treme fluctuations" of a temporary nature, due to wind and baro-
metric pressure, of about 11/ feet above or below the mean lake level
prevailing at the time.
    The estimate of cost of new work, made in 1930, was $504,000,
exclusive of amount expended on previous project. The latest
  (1928) approved estimate for annual cost of maintenance is $14,000.
    The existing project was authorized by the following river and
harbor acts: The act of August 30, 1852, provided for an artificial
channel between Black Lake and Lake Michigan; the act of March
2, 1867, provided for piers and revetments to protect the channel
  (Annual Report for 1866, pp. 106 to 109) ; the act of March 3, 1899,
provided for extending the inner piers (H. Doc. No. 272, 54th Cong.,
2d sess.) ; the act of March 3, 1905, provided for the converging piers
   (Annual Report for 1905, p. 2176) ; and the act of July 3, 1930,
provided for extending the converging piers to shore and for the
present channel dimensions (H. Doc. No. 588, 69th Cong., 2d sess.).
  The latest published map is in the last-mentioned document.
     Terminal facilities.-There are two package-freight terminals on
the south side of Black Lake, one at the city of Holland, the other
near the west end of the lake. There is a private wharf at Holland
which is open to general use. The wharves at Holland are connected
with the steam railway. There are no public or municipal wharves.
The terminals are considered adequate for the existing commerce.
1082      REPORT OF           CHIEF OF ENGINEERS,       U.   S.    ARMY,    1934


  Operations and results during fiscal year.-Operationsconsisted of
dredging 63,994 cubic yards for restoration of project depth in the
entrance channel and channel in Black Lake at a cost of $6,216.28.
Rebuilding superstructure, in concrete, on 801 linear feet of the south
converging pier, in progress at the close of the previous fiscal year,
was completed at a cost of $20,629.32. Rebuilding superstructure, in
concrete, on 998 linear feet of the south revetment, in progress at
the close of the previous fiscal year, was completed at a cost of
$13,014.92. Minor repairs to revetments cost $1,009.31. All work
was done by hired labor and use of Government plant. The total
cost was $40,869.83 for maintenance. The total net expenditures
were $43,252.13.
  Condition at end of fiscal year.-The project in effect prior to the
modification of July 3, 1930, is completed. The pier construction was
completed in 1910. Dredging to deepen the entrance channel and to
provide the inner channel in Black Lake was completed in 1933 and
1932, respectively. No work has been done on that part of the last
modification of the project providing for extending the converging
piers to shore as that work is no longer considered necessary. The
controlling depth at low-water datum at the close of the fiscal year
was 21 feet on the entrance bar in Lake Michigan, 19 feet in the
basin between the converging piers, and 18 feet in the channel be-
tween the inner piers to Black Lake. There was a controlling depth
of 17 feet in the inner channel in Black Lake to the wharves at
Holland. The costs of permanent work under the existing project
are $353,222.20 for new work and $509,391.94 for maintenance, a total
of $862,614.14. The total expenditures are $862,621.08.
  Proposed operations.-The balance unexpended, including ac-
counts receivable, will be applied as follows:
Accounts payable June 30, 1934 ..--                               $10. 21
Maintenance:
    Operation of U. S. hopper dredge Meade, November 1934 and
      May 1935-----------------------------------             11, 959.03

       Total_-------------------------------------                              11, 969. 24
   Dredging is required annually for maintenance of project dimen-
sions of channel. The additional sum of $12,000 can be profitably
expended during the fiscal year ending June 30, 1936, in maintenance
operation of U. S. hopper dredge Meade during the spring of 1936.
                                  Cost and financial summary

Cost of new work to June 30, 1934 ---------------------------- $529, 842. 00
Cost of maintenance to June 30, 1934--------------------------- 636, 989. 44
      Total cost of permanent work to June 30, 1934------------ 1, 166, 831. 44
Plus accounts receivable June 30, 1934 ____________ ____17.                  15

      Gross total costs to June 30, 1934 ________-____--             -_____1, 166, 848. 59
Minus accounts payable June 30, 1934________________              _______-10.           21

     Net total expenditures--------------------------------1, 166, 838. 38
Unexpended balance June 30, 1934 __________________11,             952. 09
       Total amount appropriated to June 30, 1934-__                 _       1, 178, 790. 47
             RIVERS AND HARBORS-MILWAUKEE,                               WIS., DISTRICT                       1083

         Fiscal year ending June 30             1930         1931          1932            1933               1934


Cost of new work---------            ------------------------------------------        $38, 214. 21--
Cost of maintenance----------------------- $52, 684. 42 $1, 812. 53 $45, 601. 13        79, 085. 36         $40, 869. 83
      Total cost...---------------------      52, 684. 42   1,812.53     45, 601.13    117, 299. 57          40, 869. 83

Total expended....---------------...-------   45, 350. 60   5, 055. 57   38, 977.13    121, 342. 47         43, 252.13
Allotted.---------------------------          16000. 00     4,000.000.
                                                                    00   92, 500.00     84,260.93            23, 000.00


Balance unexpended July 1, 1933---------------------------     $32,204.22
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934----------------------$5,   000. 00
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933--------------------- 40, 000. 00
                                                                45, 000.00

      Amount to be accounted for.      .                                                                    204. 22
                                                                                                        7---------------------
                                                                                                      77,

Deductions on account of revocation of allotment-                                 __                    22, 000. 00
      Net amount to be accounted for-------------         --                       -                    55, 204. 22
Gross amount expended------------------------- $45, 477. 81
Less reimbursements collected---------------------- 2, 225. 74
                                                                                                        43, 252. 13

      Balance unexpended June 30, 1934---------------                                                   11, 952. 09
Outstanding, liabilities June 30, 1934_ --------------------------                                           10. 21
      Balance available June 30, 1934-          __          -        -
                                                                 11, 941. 88 --
Accounts receivable June 30, 1934-------------------------------      17. 15

         Unobligated balance available June 30, 1934_-                                                11, 959. 03
Amount (estimated) required to be appropriated for completion
                       - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - -
of existing project 1                                                                        128, 000. 00

Amount that can be profitably expended in - fiscal    year ending
                                     --------- ------ - - - ------ --
June 30, 1936, for maintenance 1---                                                                    12, 000. 00

          20. GRAND HAVEN HARBOR AND GRAND RIVER, MICH.

   Location.-The harbor is located on the east shore of Lake Michi-
gan distant about 108 miles northeasterly from Chicago and about
23 miles northerly from Holland. The river rises in Jackson County,
Mich., and flows in a general westerly direction into Lake Michigan,
with a total length of about 260 miles. (See U. S. Lake Survey
Chart No. 65, and U. S. Geological Survey Grand Rapids quad-
rangle.)
   Previous projects.-The original project for the river was adopted
by the River and Harbor Act of 1881. A new project was adopted
by the River and Harbor Act of 1896, and was modified by the River
and Harbor Act of 1902. The total cost and expenditures prior to
the commencement of work under the existing project in 1905 were
$324,756.60, of which $311,329.15 was for new work and $13,427.45
for maintenance. For further details see page 1949 of Annual Re-
port for 1915.
  Ewisting project. This provides for protecting the mouth of the
river by piers and revetments, 415 feet apart at the entrance, dimin-
ishing to 390 feet inside, about 3,569 and 5,549 feet in length for the
north and south sides, respectively, and for a channel 23 feet deep
  'Exclusive     of available funds.
1084   REPORT   OF CHIEF OF ENGINEERS,     U.   S. ARMY,   1934


and generally 300 feet wide and 1,500 feet long from that depth in
the lake to a point about 1,000 feet inside the pier ends; thence 21
feet deep and 300 feet wide and 11/4 miles long to the car-ferry slip,
with an enlargement at the upper end; thence 21 feet deep and 200
feet wide and 11/4 miles long from the car-ferry slip to the Grand
Trunk Railway bridge at Ferrysburg; and thence up Grand River
8 feet deep at low-water datum, 100 feet wide and 143/4 miles long to
Bass River, the total length of channel being about 171 miles. The
piers and revetments are built of timber cribs and piling, 2,893 feet
of the north side and 3,152 feet of the south side having been pro-
vided with concrete superstructure.
   The estimate of cost of new work, revised in 1932, is $745,000,
exclusive of amounts expended on previous projects. The latest
 (1932) approved estimate for annual cost of maintenance is $35,000.
   The project depths are referred to low-water datum for Lake
Michigan, which is taken at 578.5 feet above mean tide level at New
York. The fluctuations of water level in the harbor are seasonal
changes of about one-half foot above or below the annual mean stage,
and extreme fluctuations of a temporary nature, due to wind and
barometric pressure, of about 11/2 feet above or below the mean lake
level prevailing at the time.
   The existing project was authorized by the following river and
harbor acts: The act of June 23, 1866, as amended by the acts of
June 14, 1880, September 19, 1890, and July 13, 1892, provided for
the piers and revetments; the act of June 3, 1896, provided for a
channel 100 feet wide in the river from Grand Rapids to Grand
Haven (H. Doc. No. 197, 52d Cong., 1st sess.); the act of June 13,
1902, extended the channel in the river one-half mile upstream to
Fulton Street, Grand Rapids (Annual Report for 1903, p. 510); the
act of March 3, 1905, provided for a depth of 6 feet in the river
channel (H. Doc. No. 216, 58th Cong., 2d sess.); and the act of
July 3, 1930, consolidated the projects for the harbor and river and
authorized the present dimensions of the channel, eliminating all
that portion of Grand River above Bass River (S. Doc. No. 88, 71st
Cong., 2d, sess.). The latest published map is in the last-mentioned
document.
   Terminal facilities.-There are 2 package-freight terminals, 2 coal.
wharves, a car-ferry slip, and a sand and gravel company terminal
with rail connections. The facilities are considered adequate for the
existing commerce, except that there should be a public wharf in
Grand Haven for transfer between rail and water.
   Operations and results during fiscal year.-Operations consisted
of dredging 62,197 cubic yards for restoration of project depth,
below the Grand Trunk Railway bridge, at a cost of $6,484.94.
Dredging 83,058 cubic yards for restoration of project depth in the
river above the Grand Trunk Railway bridge, cost $8,567.19. Plac-
ing 7,867 tons of stone as riprap along the piers cost $12,518.29.
Minor repairs to piers and revetments cost $1,127.23. Reinforcing
substructure and building concrete superstructure on 360 linear feet
of the south revetment cost $18,770.06. All work was done by hired
labor and use of Government plant. The total cost was $47,467.71
for maintenance. The total net expenditures were $52,896.66.
        RIVERS AND HARBORS-MILWAUKEE,                   WIS., DISTRICT                 1085
   Condition at end of fiscal year.-The project for the harbor in
effect prior to the modification of July 3, 1930, was completed in 1906
at a saving of $261,389 under the estimated cost. That portion of the
channel between the car-ferry slip and the Construction Materials
Corporation plant near the Grand Trunk Railway bridge was wid-
ened and deepened to the new project dimensions in 1930 with ad-
vanced funds. The deepening of the river to the new project depth
above the railway bridge to Bass River was completed in 1931. The
work remaining to be done under the new project is a small amount
of deepening and widening of the channel below the car-ferry slip.
The entire existing project is about 97 percent completed. Portions
of the revetments still require repairs and stone filling. The con-
trolling depths at low-water datum at the close of the fiscal year
were 19.5 feet in a channel 240 feet wide to the Grand Trunk car-ferry
slip, thence 18.5 feet to the Grand Trunk Railway bridge, thence 7
feet to Bass River. The costs of permanent work under the ex-
isting project are $723,919.39 for new work and $1,310,106.07 for
maintenance, a total of $2,034,025.46. The total expenditures are
$2,035,062.64.
   Proposed operations.--The balance unexpended will be applied as
follows :
Maintenance :
   Operation of U. S. hopper dredge Meade, July and November
      1934 and May 1935_         _____________               $21,000. 00
    Operation of U. S. bucket dredge Tompkins, July-November
      1934 and April-June 1935____ _ _              _ _-_ _ _ _                   14, 000. 00
    Reinforce substructure and rebuild superstructure on 401 linear
     feet of south revetment with United States plant, about
     September-November 1934--------------------------------17, 983. 44
    Complete riprapping piers with United States plant, 1,000 tons
     at $3, during the fiscal year-------------------------------- 3, 000. 00
    Minor repairs to piers and revetments by hired labor during the
      fiscal year ___                   _                                             000. 00
                                                                                    20,

        Total-                                                                      57, 983. 44
                                                                          ------------

   Dredging is required annually for maintenance of project dimen-
sions of channel. The south pier and revetment just inside of the
shore line requires repairs. The additional sum of $68,000 can be
profitably expended during the fiscal year ending June 30, 1936,
as follows:
Maintenance:
   Operation     of U. S. hopper      dredge   Meaide, fall       1935,    and
      spring 1936                                          _          _-_ _- $14, 000. 00
    Operation of U. S. bucket dredge Tompkins, summer and fall
      1935, and spring 1936                                     _---------------------_
                                                                        15, 050. 00
    Reinforce substructure and rebuild superstructure on 770 linear
      feet of south pier and revetment at $45 with United States
      plant, fall of 1935_-- -        ---------------                   34, 650. 00
    Stone filling for revetments, 1,000 tons at $3.30 with United
      States plant during the fiscal year                                 3, 300. 00
    Minor repairs to piers and revetments with United States plant
      during the fiscal year-------------------                           1, 000. 00

      Total-----------------------                                                     000. 00
                                                                                   6---------------8,
1086           REPORT OF CHIEF OF ENGINEERS,                                             U. S. ARMY,                 1934

                                             Cost and financiat summary
Cost of new work to June 30, 1934--___--  ____                                                                      $1,035, 248. 54
Cost of maintenance to June 30, 1934-----------------------                                                          1, 323, 533. 52
      Total cost of permanent work to June 30, 1934----------                                                         2, 358, 782.06
Value of plant, materials, etc., on hand June 30, 1934                                        -----------                  1, 037. 18
            Net total cost to June 30, 1934-----------                                       ,------------            2, 359, 819. 24

Net total expenditures ----------------------------------    2, 359, 819. 24
Unexpended balance June 30, 1934 ---------------------------     57, 983. 44
            Total amount appropriated to June 30, 1934_________                                                       2, 417, 802. 68

          Fiscal year ending June 30                             1930            1931             1932             1933           1934


Cost of new work-----------........      ... ------------------- $55, 072. 00                  $2, 312. 21 --
Cost of maintenance------...........           - ------ $69,421. 18            24, 975. 69     43, 589.48     $56, 806. 95      $47, 467. 71

       Total cost-------------....................---------69, 421. 18         80, 047. 69     45, 901. 69      56, 806. 95      47, 467. 71
                                         59, 831. 83
Total expended--..................---------                                    84, 123. 03     42, 159. 82      59, 976. 28      52,896. 66

Allotted.          ......                                        28, 000. 00
                                      ....----------------------------         95, 000. 00     15, 000. 00      43, 727. 86     103, 400. 00


Balance unexpended July 1, 1933-- --------------------------      _                                                           $7, 480. 10
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934---------------------$49,        000. 00
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933-----------------------60, 000. 00
                                                                                                                          109, 000. 00

      Amount to be accounted for---------------------------116, 480. 10
Deductions on account of revocation of allotment---------------- 5,600. 00

      Net amount to be accounted for-_                          110, 880. 10
Gross amount expended-      ----------------------------------- 52, 896. 66
            Balance unexpended June 30, 1934-------------------                                                               57, 983. 44

Amount (estimated) required to be appropriated for completion of
existing project
                  1- - - - - - -           - - - - - - - ---- ------ --
                                                                                                                              9,9 000. 00
Amount that can be profitably expended in fiscal year ending June
   30, 1936, for maintenance                                ---------
                                                               -                                             ___              68, 000. 00

                                      '21. MUSKEGON HARBOR, MICH.

  Location.-This harbor is on the east shore of Lake Michigan,
distant about 114 miles northeasterly from Chicago and about 80
miles easterly from Milwaukee. (See U. S. Lake Survey Chart No.
767.)
  Previous projects.-Adopted by the River and Harbor Act of 1867,
and modified by the River and Harbor Acts of 1872, 1874, 1882,
1890, 1894, 1899, and 1902. The cost and expenditures prior to the
commencement of work under the existing project were $1,059,590.91,
of which $613,407.96 was for new work and $446,182.95 for mainte-
nance. For further details see page 1950 of Annual Report for 1915,
and page 1399, Annual Report for 1924.
  Existing project.-This provides for an exterior basin in Lake
Michigan, formed by two arrowhead breakwaters, the south 1,514
feet and the north 1,404 feet long, 500 feet apart at the outer ends,
   1Exclusive of available funds.
        RIVERS   AND HARBORS-MILWAUKEE,         WIS., DISTRICT    1087
diverging at an angle of about 900, the inner ends connected with
the shore by suitable structures 1,660 feet and 1,561 feet long on the
north and south sides, respectively; for the removal of 1,003 feet of
the existing north pier and 1,106 feet of the existing south pier; for
dredging a channel 600 feet wide at the entrance, decreasing toward
the new pierheads to: 500 feet wide and 240 feet wide between the
piers with depths varying from 24 feet at the harbor entrance to 21
feet at the shore line and in the inner channel to Muskegon Lake,
about 6,000 feet from the harbor entrance. The south breakwater
and shore connection are built of concrete caissons and piling capped
with concrete; the north breakwater is a rubble mound; the inner
piers and revetments are built of timber cribs and piling, the entire
north pier and revetment and 692 feet of the south pier and revet-
ment having been capped with concrete, and 268 feet of the south
revetment has been repaired with rubble superstructure.
   The project depth referred to is low-water datum for Lake Michi-
gan, which is taken at 578.5 feet above mean tide level at New York.
The fluctuations of water level are seasonal changes of about one-
half foot above or below the annual mean stage, and extreme fluc-
tuations of a temporary nature, due to wind and barometric pressure,
of about 11/2 feet above or below the mean lake level prevailing at
the time.
   The estimate of cost for new work, revised in 1930, was $2,134,500,
exclusive of amounts expended on previous project. The latest
 (1922) approved estimate for annual cost of maintenance is $25,000.
   The existing project was authorized by the River and Harbor Act
approved March 3, 1925 (H. Doc. No. 494, 67th Cong., 4th sess.).:
The latest published map is in the project document.
   Local cooperation.-Complied with.
   Terminal facilities.-The terminals, including a car-ferry slip, are
at the city of Muskegon, at the inner end of Muskegon Lake. There
are several piers, in poor condition, provided with railroad con-
nections and warehouses, which are open to general use. The city
has a few landing places available for small craft, such as motor
boats. The facilities are considered adequate for the existing
commerce.
    Operations and results during fiscal year.-Operations consisted
of dredging 110,000 cubic yards for restoration of project depth,
at a cost of $11,416.37. Rebuilding superstructure, in concrete, on
the inner 2,372 linear feet of the north revetment, in progress at
the close of the previous fiscal year, was completed at a cost of
 $33,587.80. Rebuilding superstructure, in concrete, on 1,812 linear
feet of the south revetment, in progress at the close of the fiscal
year, cost $26,938.36. Rebuilding 812 linear feet of substructure of
the south revetment and building concrete superstructure thereon,
in progress at the close of the fiscal year, cost $15,180.94. Minor re-
pairs were made to piers and revetments at a cost of $4,385.10 and
1,948 tons of stone were placed for backfilling the piers and revet-
ments, at a cost of $3,460.86. All work was done by hired labor
and use of Government plant. The total cost was $94,969.43 for
maintenance. The total net expenditures were $100,891.62.
    Condition at end of fiscal year.-The project for an arrowhead
type of harbor was completed in 1932 at a saving of $283,908 under
      91536--ENG 1934--69
1088        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                     1934

the estimated cost.                    The south breakwater and south-shore connec-
tion was completed in 1930. The north breakwater and shore con-
nection and removal of old piers was completed in 1931. Deepening
and widening entrance channel was completed in                                                        1932.      Concrete
superstructure is being built on 2,624 feet of the south revetment.
The controlling depths at low-water datum at the close of the fiscal
year were 22 feet over the full width of channel through the outer
harbor and 20.5 feet between the inner piers to Muskegon Lake.
The costs of permanent work under the existing project are $1,856,-
192.44 for new work and $230,195.18 for maintenance, a total of
$2,086,387.62. The total expenditures are $2,092,543.45.
  Proposed operations.--The balance unexpended will be applied
as follows:
Accounts payable June 30, 1934_ _______-_------      ---------     $12, 290.05
Maintenance:
    Operation of U. S. hopper dredge Meade, spring 1935_ __--- __    9,000. 00
   Complete reinforcing substructure and rebuilding superstruc-
      ture on about 1,624 linear feet of south revetment and re-
      building about 1,000 linear feet south revetment with United
      States plant about October 1934--------                           352. 99
                                                                    7------------------7,
   Riprap and backfill for breakwaters, shore connections, piers,
      and revetments with United States plant, 4,000 tons at $3.30
      during the fiscal year-------------------------------         13,200.00

             Total             ___-------------------------------------------                                    111, 843. 04
   Dredging is required annually for maintenance of project dimen-
sions of channel. Revetments should be backfilled with stone. The
additional sum of $19,000 can be profitably expended during the
fiscal year ending June 30, 1936, as follows:
Maintenance:
   Operation of U. S. hopper dredge Meade, fall 1935 and spring 1936_ $10; 000
   Stone backfill for revetments, 3,000 tons at $3 with United States
      plant during the fiscal year------------------------------        9, 000

              Total---__
                       --                                                                                                , 000
                                                                                                                      1-----------------------

                                         Cost and financial summary

Cost of new work to June 30, 1934-----------------------$2, 469,600. 40
Cost of maintenance to June 30, 1934------------------------- 676, 378. 13
      Total cost of permanent work to June 30, 1934---------     3, 145, 978. 53
Value of plant, materials, etc., on hand June 30, 1934----------     18, 445.88

      Net total cost to June 30, 1934--------------------------                                               3, 164, 424. 41
Minus accounts payable June 30, 1934-----------------------                                                       12,290. 05

     Net total expenditures-----------------------------                                                      3, 152, 134. 36
Unexpended balance June 30, 1934------------- ----                                                               111, 843. 04

          Total amount appropriated to June 30, 1934-------------3, 263, 977. 40

          Fiscal year ending June 30                       1930            1931           1932            1933          1934


Cost of new work------------------...................--.. $362, 418. 36 $695, 441. 38 $555, 704. 73     $5, 600. 00 ............
Cost of maintenance--.....- -------                       -  9,152. 40     2,290. 31    25, 269. 67     84,784. 99   $94, 969. 43
       Total cost.__....- .....-.---        ___.-._ 371, 570. 76       697, 731. 69    580, 974. 40     90, 384. 99   94,  43
                                                                                                                        969.
Total expended----------------------289, 613.46                        645, 525. 74    691, 126. 16    119, 679. 75   100, 891.62
                                830, 000. 00 625, 000. 00 -83,000. 00
Allotted------------.......................--.........                                                 -1,000. 00     180, 734. 67
          RIVERS AND HARBORS--MILWAUKEE,                    WIS.,   DISTRICT       1089

Balance unexpended July 1, 1933------------------------------              $31,999.99)
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934--------------------             $105, 300.00
Amount allotted from War Department Appropriation
  Act approved Mpr. 4, 1933            -----------             77, 000. 00
                                                                           182, 300. 00
      Amount to be accounted for--------------------------                 214, 299.99
Deductions on account of revocation of allotment------- ------               1. 565. 33
      Net amount to be accounted for             ----------------------- 212, 734. 66
Gross amount expended------------------------ $103, 352. 82
Less reimbursements collected --------------------              2, 461. 20
                                                                           100. 891.62

      Balance unexpended June 30, 1934--------------------                111, 843.04
Outstanding liabilities June 30, 1934-------------__------------           16, 548. 89

       Balance available June 30, 1934_                                        95, 294. 15

Amount that can be profitably expended in fiscal year ending June
  30, 1936, for maintenance    1--------------                                 19, 000. 00

                      22.   WHITE          LAKE   HARBOR,   MICH.

   Location.-On the east shore of Lake Michigan, about 120 miles
northeasterly from Chicago and about 45 miles southerly from
Ludington. (See U. S. Lake Survey Chart No. 768.)
   Existing project.-This provides for the abandonment of the old
outlet and the creation of a new channel 16 feet deep, 200 feet wide,
and about 1,950 feet long from Lake Michigan to White Lake be-
tween parallel piers and revetments having lengths of 1,715 feet and
1,953 feet on north and south sides, respectively. The piers and
revetments are built of timber cribs and piling; 30 feet of the north
pier has been capped with concrete superstructure and 215 feet of
the north pier and 150 feet of the south pier has been paved with
concrete. The project depth is referred to low-water datum for
Lake Michigan, which is taken at 578.5 feet above mean tide level at
New York. The fluctuations of water level are seasonal changes of
about one-half foot above or below the annual mean stage and ex-
treme fluctuations of a temporary nature, due to wind and barometric
pressure, of about 11/2 feet above or below the mean lake level
prevailing at the time.
   The estimated cost of new work, revised in 1907, was $353,550,
The latest (1928) approved estimate for annual cost of maintenance
is $5,500.
   The project was adopted by the River and Harbor Act approved
March 2, 1867, and amended by River and Harbor Acts approved
March 3, 1873; July 5, 1884; July 13, 1892; and March 2, 1907.
These amendments relate principally to the length of the proposed
piers and revetments, and the estimated costs, except the last one,
which increased the project depth by dredging. The latest published
mnap is in House Document No. 2053, Sixty-fourth Congress, second
session.
   Terminal facilities.-About three-fourths of a mile south of the
village of Montague, at the inner end of White Lake, is a package
freight wharf; across the lake, at the village of Whitehall, is a coal
wharf and two or three small wharves available for boats of shallow
   1Exclusive of available funds.
 1090        REPORT         OF CHIEF OF ENGINEERS,                           U.    S. ARMY,        1934

  draft. These facilities are considered adequate for the existing
  commerce.
    Operations and results during fiscal year.-Operations consisted
of dredging 48,829 cubic yards for restoration of project depth at a
cost of $6,988.11. Placing 1,318 tons of stone for ri rap along the
piers and filling cost $2,676.10. All work was done by hired labor
and use of Government plant. The total cost was $9,664.21 for
maintenance. The total net expenditures were $11,399.17.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1908 at a saving of $145,688 under the estimated cost. The
project depth was obtained in 1908. The piers have been repaired, so
that they will serve their purpose for a short time without extensive
repairs. The controlling depths at low-water datum at the close of
:the fiscal year were 18 feet on the entrance bar and 17 feet in a
narrow channel between the piers to White Lake. The costs of per-
,manent work under the existing project are $207,862.44 for new
-work and $284,828.56 for maintenance, a total of $492,691. The
total expenditures are $491,999.13.
    Proposed operations.-The balance unexpended will be applied as
follows:
Accounts payable June 30, 1934    ------------------------------- $691.87
Maintenance:
    Operation of U. S. hopper dredge Meade, June 1935----------5,112. 45
    Riprap piers with United States plant, 600 tons, at $3, during
      the fiscal year--  ----------------------------- --------    1, 80000

            Total-------------------------------------------                                               7, 604. 32
  Dredging is required annually for maintenance of project dimen-
sions of channel. Additional riprap should be placed along the
piers. The additional sum of $10,000 can be profitably expended
during the fiscal year ending June 30, 1936, as follows:
Maintenance :
    Operation of U. S. hopper dredge Meade during June 1936--------.. $7, 000
    Riprap piers, 1,000 tons at $3, with United States plant during
      the fiscal year-----------------------------------------         3, 000

            Total ----------------------------------------------                                             10, 000

                                   Cost and financial summary

Cost of new work to June 30, 1934--_- ------------------                                              $207, 862. 44
Cost of maintenance to June 30, 1934------------------------                                           284, 828. 56

     Total cost of permanent work to June 30, 1934----------                                           492, 691.00
Minus accounts payable June 30, 1934-------------------------                                               691. 87

     Net total expenditures---------------                                   -----------               491, 999. 13
Unexpended balance June 30, 1934                                                                          , 604. 32
                                                                                                         7---------------------------

         Total amount appropriated to June 30, 1934-------------                                       499, 603.45

        Fiscal year ending June 30                 1930          1931              1932        1933           1934

Cost of new work------         ------------      -----------------------------------------
Cost of maintenance ------------------- $6, 450.44 $32, 688. 68   $1. 31 $9, 257.91 $9, 664.21
Total expended........-----------------------     5, 339. 28   30, 965. 26        3,069. 68   6, 597. 29    11,399. 17
        .........------------------------
Allotted----                                     28, 500. 00   14, 000.00 --------            3, 475. 00    15, 000. 00
           RIVERS AND HARBORS-MILWAUKEE,                      WIS., DISTRICT         1091
Balance unexpended July 1, 1933 -- __--_-----------------------               $4, 003. 49
Amount allotted from War Department Appropriation Act
  approved Apr. 26, 1934----------------- --------- $6, 000. 00
Amount allotted from War Department Appropriation Act
  approved Mar. 4, 1933                                           000. 00
                                                              1---------------------------0,
                                                                     --       16, 000. 00

       Amount to be accounted for_____-___________                              20, 003.49
Deductions on account of revocation of allotment_____-_---              __       1, 000. 00
       Net amount to be accounted for          ------------------------         19, 003. 49
Gross amount expended_ ___--_         ---------------------                     11, 399. 17

      Balance unexpended June 30, 1934__------------                             7, 604. 32
Outstanding liabilities June 30, 1934__.._________-----                             691. 87
       Balance available June 30, 1934----------------------------               6, 912. 45

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1_-     -___----------      ___-10,                     000. 00
                       23. PENTWATER HARBOR, MICH.

    Location.-On the east shore of Lake Michigan, about 146 miles
northeasterly from Chicago and about 14 miles southerly from:
Ludington. (See U. S. Lake Survey Chart No. 77.)
    Existing project.-This provides for widening the old entrance
channel to 150 feet between parallel piers and revetments, the chan-
nel to extend from Lake Michigan to Pentwater Lake, with a depth
of 16 feet. The piers and revetments are built of timber cribs and
piling. The project depth is referred to low-water datum for Lake
Michigan, which is taken at 578.5 feet above mean tide level at
New York. The fluctuations of water level are seasonal changes
of about one-half foot above or below the annual mean stage and
extreme fluctuations of a temporary nature, due to wind and baro-
metric pressure, of about 11/2 feet above or below the mean lake level
prevailing at the time.
   The estimate of cost for new work, revised in 1892, is $327,713.40,
excluding the amendment of 1907. There is no adopted estimate of
cost for the last amendment nor for annual maintenance.
   The existing project was adopted by the River and Harbor Act
approved March 2, 1867, and amended by River and Harbor Acts
approved March 3, 1873; July 5, 1884; July 13, 1892; and March 2,
1907. These amendments; relate principally to the length of the
proposed piers and revetments, except the last one, which provided
for the present depth of dredging. The latest published map is in
House Document No. 303, Sixty-sixth Congress, first session.
   Terminal facilities.-A number of small privately owned wharves
are grouped at the west end of Pentwater Lake. These facili-
ties are considered adequate for the existing commerce which has
decreased to almost nothing.
   Operations and results during fiscal year.-Operationsconsisted of
preparatory work incidental to dredging the entrance channel to a
depth of 10 feet, by contract, at a deferred cost of $49.50. There
were no expenditures.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1907, except for a 200-foot extension to the south pier. A
  1Exclusive of available funds.
1092          REPORT          OF CHIEF OF ENGINEERS,                                U. S. ARMY, 1934

channel about 2,200 feet long had been constructed from Lake Michi-
gan to Pentwater Lake, with north pier and revetment 2,226 feet
long, and a south pier and revetment 1,847 feet long, and with width
between piers of 153 feet at the entrance, narrowing to 140 feet at the
inner end. The net length of the north pier is now 2,022 feet, 204
feet having been removed in 1931. The piers and revetments are in
poor condition. Stone placed in 1931 as riprap and filling the outer
ends of both piers put the structures in as safe condition as possible
for a few more years without extensive rebuilding. The controlling
depths at low-water datum at the close of the fiscal year were 6 feet
on the entrance bar in Lake Michigan and 3.5 feet in a narrow chan-
nel between the piers to Pentwater Lake. The costs of permanent
work under the existing project are $179,899.10 for new work and
$173,920.90 for maintenance, a total of $353,820. The total expendi-
tures are $353,820.
  Proposed operations.-The balance unexpended will be applied as
follows:
Accounts payable June 30, 1934------------------------------                                                            $49. 50
Maintenance :
    Dredging entrance channel to 10-foot depth under contract dated
           July 9, 1934, to be completed August 1934                                     -------                    14, 950. 50

              Total         ____             __             __ __--------------______-____          __              15, 000. 00
  The available funds will be sufficient for maintenance of the project
to June 30, 1936, and no additional funds can be profitably expended.
                                         Cost and financial summary

Cost of new work to June 30, 1934----------------------------    $179, 899. 10
Cost of maintenance to June 30, 1934----------------------------173, 920. 90
      Total cost of permanent work to June 30, 1934------------                                                353, 820. 00
Value of plant, materials, etc., on hand June 30, 1934---------                                                      49. 50

      Net total cost to June 30, 1934---------------------------- 353, 869. 50
Minus accounts payable June 30, 1934----------------------------        49. 50

      Net total expenditures--------------- ------------------ 353, 820. 00
Unexpended balance Juine 30, 1934------------------------------15, 000. 00
           Total amount appropriated to June 30, 1934-------------- 368, 820. 00

           Fiscal year ending June 30                      1930            1931           1932       1933               1934


Cost of new work------------------

                                                                                                     - - -- - - -
Total expended ----------------                   --   _               -            [   7, 000. 00 ________
Allotted         nance.....----------------------      -----------                ---- -- ---------------- -$15,          000 00


Amount allotted from War Department Appropriation Act approved
July 14, 1932_---------------------------------------------$15,                                                       000. 00

Balance unexpended June 30, 1934_-------------------------------                                                    15, 000. 00
Outstanding liabilities June 30, 1934------------------------------                                                      49. 50

     Balance available June 30, 1934----------_--                 14, 950. 50
Amount (estimated) required to be appropriated for completion of
                 1  -- ----- ---- ---- ---- ---- ---- - -
existing project ____                                           147, 800. 00
     Exclusive of available junk.
        RIVERS AND HARBORS-MILWAUKEE,:        WIS.,   DISTRICT   1093
                   24. LUDINGTON HARBOR, MICH.
   Location.-This harbor is located on the east shore of Lake
Michigan, distant about 156 miles northeasterly from Chicago and
about 67 miles northerly from Grand Haven. (See U. S. Lake
Survey Chart No. 774.)
   Previous projects.-The original project was adopted by the River
and Harbor Act of 1867 and was modified by the River and Harbor
-Acts of 1886, 1888, and 1899. The cost and expenditures prior to
commencement of work under the existing project in 1908 were
 $617,867.30, of which $491,416.22 was for new work and $126,451.08
for maintenance. For further details see page 1951 of Annual
Report for 1915.
  Existing project.-This provides for an exterior basin in Lake
Michigan, formed by two breakwaters, each with main arm 1,800
feet long, 400 feet apart at the outer ends, diverging at an angle of
900, and with shore connections, 1,103 feet and 2,004 feet in length
for north and south breakwaters, respectively; for the removal of
the outer end of the inner piers; for dredging the exterior basin
to a depth of 18 feet; and for an inner channel about 2,000 feet
long connecting Pere Marquette Lake with Lake Michigan, the mini-
mum navigable width being 150 feet and depth of 18 feet. The
breakwaters are built of stone-filled timber cribs and piling. The
main arm of each breakwater and 804 feet of the south shore con-
nection have been repaired with concrete superstructure. Also the
entire north pier and revetment and the entire south pier and revet-
ment are provided with concrete superstructure.
   The project depth is referred to low-water datum for Lake Michi-
gan, which is taken at 578.5 feet above mean tide level at New York.
The fluctuations of water level are seasonal changes of about one-
half foot above or below the annual mean stage, and extreme fluctua-
tion of a temporary nature, due to wind and barometric pressure, of
about 11/2 feet above or below the mean lake level prevailing at the
time.
   The estimate of cost for new work, revised in 1916, was $1,090,587,
exclusive of amount expended on previous project. The latest
 (1928) approved estimate for annual cost of maintenance is $20,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 2, 1867, provided for the entrance
piers (Annual Report for 1867, p. 114); the act of March 3, 1899,
provided for a channel 18 feet deep below low water (2 feet below
mean lake level, 1860-75) between Lake Michigan and Pere Mar-
quette Lake, for pier extensions, and reconstruction and repairs to
existing structures (H. Doc. No. 273, 54th Cong., 2d sess.) ; the act
of March 2, 1907, provided for the breakwaters, shore connections,
and removal of outer ends of the two inside piers (H. Doc. No. 62,
59th Cong., 1st sess., and Rivers and Harbors Committee Doc. No.
3, 59th Cong., 2d sess.); the act of July 25, 1912, provided for addi-
tional riprap and stone filling (Annual Report for 1912, p. 1044);
the act of July 27, 1916, provided for dredging in the basin and for
riprap for the breakwaters (Annual Report for 1916, p. 1401). The
latest published map is in the Annual Report for 1914, page 2974.
   Terminal facilities.-The main terminal is that of the Pere Mar-
quette Railway Co., with three car-ferry slips, wharves with ware-
houses and grain elevator, all with railroad connection. The facili-
1094    REPORT        OF CHIEF          OF ENGINEERS,        U.   S. ARMY,   1934

ties are considered adequate for the existing boat lines but are very
poor for general commerce, there being no public wharf for transfer
between rail and water.
   Operations and results during fiscal year.-Operations consisted
of dredging 17,877 cubic yards for restoration of project depth at
a cost of $3,943.15. Minor repairs to breakwaters, piers, and revet-
ments cost $321.45. All work was done by hired labor and use of
Government plant. The total cost was $4,264.60 for maintenance.
The total net expenditures were $4,705.17.
   Condition at end of fiscal year.-The project was completed in
1918 at a saving of $54,501 under the estimated cost. The dredging
was completed in 1917 and the riprap in 1918. The timber super-
structures of the inner portions of the shore connections are in poor
condition. The controlling depths at low-water datum at the close
of the fiscal year were 21.5 feet in mid-channel through the outer
harbor and 19.5 feet in the channel between the inner piers to Pere
Marquette Lake. The costs of permanent work under the existing
project are $1,036,085.93 for new work, and $591,141.97 for mainte-
nance, a total of $1,627,227.90. The total expenditures are $1,628,-
204.47.
   Proposed operations.-The balance unexpended will be applied as
follows:
Maintenance:
    Operation of U. S. hopper dredge Meade, October 1934 and
      May 1935--------------                                      $11,077.98
    Riprap breakwaters and backfill revetments with United States
     plant, 500 tons at $3 during the fiscal year-------------     1, 500. 00

         Total----------------                   ---------------------------      12, 577.98
   Dredging is required annually for maintenance of project dimen-
sions of channel. The old timber superstructures on the north and
the south shore connections require rebuilding in concrete. The
additional sum of $139,000 can be profitably expended during the
fiscal year ending June 30, 1936, as follows:
Maintenance:
    Operation of U. S. hopper dredge Meade, October 1935, and May
      1936       ------------          ---------------------------                   $7, 850
    Rebuild superstructure on 1,230 linear feet of south shore connec-
      tion at $55 by contract, summer and fall of 1935-------------                  67, 650
    Rebuild superstructure on 1,100 linear feet of north shore connec-
      tion at $55 by contract, summer and fall of 1935-------------                  60, 500
    Riprap breakwaters, 1,000 tons at $3 with United States plant
      during the fiscal year------------------- ----------------                      3,000

         Total--------------------------------------------                          139, 000

                                Cost and financial summary
Cost of new work to June 30, 1934---------------------- $1, 527, 502. 15
Cost of maintenance to June 30, 1934------------------------ 717, 593. 05

      Total cost of permanent work to June 30, 1934----------2, 245, 095. 20
Value of plant, materials, etc., on hand June 30, 1934-----------    976. 57

       Net total cost to June 30, 1934__-------------                        2, 246, 071. 77

Net total expenditures   ----------------------------                         2, 246, 071.77
Unexpended balance June 30, 1934__---------------                                 12, 577. 98
       Total amount appropriated to June 30, 1934 ---------                   2, 258, 649. 75
                  RIVERS AND HARBORS-MILWAUKEE,                                              WIS.,    DISTRICT          1095

     Fiscal year ending June 30                         1930             1931            1932          1933            1934

Cost of new work ------.....................................--------
Cost of maintenance.------------                   $49, 979. 63        $28, 588. 70   $10, 223. 63    $2, 302. 26      $4, 264. 60
Total expended.----------------                       32, 999. 41       26, 997. 11     15, 193. 68    1, 800. 60       4, 705. 17
Allotted-..-.-------------------                   -61, 500. 00         42, 000. 00   -15,000. 00      5, 900. 00       9, 800. 00


Balance unexpended July 1, 1933 __  ----         -------                                                            $7, 483. 15
Amount allotted from War Department Appropriation Act approved
March 4, 1933-----------------------          -----------                                                          10, 000. 00
     Amount to be accounted for ----------------------              17, 483. 15
Deductions on account of revocation of allotment ------------------     200. 00

       Net amount to be accounted for------------------------17,                                                       283. 15
Gross amount expended--------------------------- $5, 087. 02
Less, reimbursements collected__------------------------         381. 85
                                                                                                                     4, 705. 17
             Balance unexpended June 30, 1934------------------_                                                    12, 577. 98

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance     _-----------  ---------         --- 139, 000. 00

                                           25. MANISTEE HARBOR, MICH.

   Location.-On the east shore of Lake Michigan, distant about 179
miles northeasterly from Chicago and about 26 miles northerly from
Ludington. (See U. S. Lake Survey Chart No. 776.)
   Previous projects.-The original project was adopted by the River
and Harbor Act approved March 2, 1867, and was modified by the
River and Harbor Acts approved June 10, 1872, March 3, 1873,
March 3, 1875, August 14, 1876, September 19, 1890, July 13, 1892,
March 2, 1907, and June 25, 1910. The cost and expenditures prior
to the commencement of the existing project in 1913 were $505,908.67,
of which $354,998.68 was for new work and $150,909.99 for main-
tenance. For further details see page 1952 of Annual Report for
1915.
   Existing project.-This provides for an enlarged harbor entrance
with a south breakwater having main arm 1,300 feet long and shore
connection 1,185 feet long; the dredging of an entrance basin 23 feet
deep, 570 feet wide, and 1,600 feet long to outer end of the south pier;
a channel between the piers 120 to 220 feet wide, 21 feet deep, and
2,000 feet long; dredging the river 21 feet deep, with a minimum
width of 100 feet from the inner end of the north revetment to
Manistee Lake, about 6,400 feet. The breakwater and shore connec-
tion are built of stone-filled timber cribs and piling, and are capped
with concrete superstructure. The north pier and revetment is 2,797
feet and the south pier 695 feet long, 1,797 feet of the north pier and
revetment and the entire south revetment being capped with concrete.
     The project depths are referred to low-water datum for Lake
Michigan, which is taken at 578.5 feet above mean tide level at
New York.
   1Exclusive          of available funds.
1096   REPORT OF CHIEF OF ENGINEERS,         U.   S. ARMY,   1934

    The estimate of cost for new work, revised in 1934, is $500,000,
exclusive of amount expended on previous project. The latest (1928)
approved estimate for annual cost of maintenance is $20,000.
    The existing project was authorized by the following river and
harbor acts: The act of March 2, 1867, provided for the entrance
piers (Annual Report for 1867, p. 115); the act of September 19,
1890, provided for extending the channel a distance of 8,000 feet to
connect with Manistee Lake and for further pier extension (Annual
Report, 1891, p. 2678); and the act of July 25, 1912, provided for
the south breakwater and shore connection (H. Doc. No. 599, 62d
Cong., 2d sess.) ; and the act of July 3, 1930, provided for the present
channel dimensions (S. Doc. No. 131, 71st Cong., 2d sess.). The
latest published map is in the last-mentioned document.
    Local cooperation.-The act of July 25, 1912, required the dona-
tion to the United States, without cost, of a strip of land 200 feet
square at the inner end of the shore connection of the breakwater.
This provision was complied with by deed of April 10, 1913, for a
strip of land 220 feet wide fronting on Lake Michigan.
    The act of July 3, 1930, provided " that no work shall be under-
taken on the section of the river through and above the bridges
  (Smith Street and the Manistee & Northeastern R. R. Bridges) until
they have been modified in a manner satisfactory to the Secretary
of War." The State highway commission has a permit for the re-
quired new Smith Street Bridge, but the railroad company states
that it is financially unable at present to rebuild its bridge as
required.
    Terminal facilities.-There is a Government and private wharf on
the north side of the river and two package-freight wharves with
warehouses on the south side. Industries on Manistee Lake have
wharves for bulk freight vessels. The facilities are considered fairly
adequate for the existing commerce, except that there is need for a
public wharf.
    Operations and results during fiscal year.-Operations consisted
of dredging 85,532 cubic yards for restoration of 20- and 18-foot
depths in entrance channel and river, respectively, at a cost of $12,-
868.20. Rebuilding superstructure, in concrete, on 1,309 linear feet
of the south breakwater and 441 linear feet of the north revetment,
by contract, in progress at the close of the previous fiscal year, was
completed at a cost of $41,626. All work, except rebuilding the
superstructure on the south breakwater and north revetment, was
done by hired labor and use of Government plant. The total cost
was $54,494.20 for maintenance. The total net expenditures were
 $71,294.64.
    Condition at end of fiscal year.-The project in effect prior to the
  modification of July 3, 1930, was completed in 1923. The entrance
basin was dredged, the outer 300 linear feet of the south pier was
  removed, and the wrecked outer end of the north pier was removed
  in 1923. No work has been done on the last modification of the
  project. The remaining timber superstructure on the north pier is
  in only fair condition. The controlling depths at low-water datum
  at the close of the fiscal year were 21 feet on entrance bar and in the
  outer basin and channel between the piers and 18 feet in the river.
  The costs of permanent work under the existing project are $441,-
                   RIVERS AND HARBORS-MILWAUKEE,                                                       WIS., DISTRICT                    1097
243.90 for new work and $347,259.39 for maintenance, a total of
$788,503.29. The total expenditures are $788,394.18.
  Proposed operations.-The balance unexpended will be applied as
follows:
Accounts payable June 30, 1934__________________ _________-_                                                                         $109.11
Maintenance:
     Operation of U. S. dipper dredge Kewaunee, July-August 1934__                                                                  11, 796. 84
     Operation of U. S. hopper dredge Meade, June 1935---------                                                                     11, 500. 00

              Total------------                            ------------------------------                                           23, 405. 95
   Dredging is required annually for maintenance of project dimen-
sions of channel. The old timber superstructure on the north pier
is failing and requires rebuilding in concrete. The additional sum
of $82,000 can be profitably expended during the fiscal year ending
June 30, 1936, as follows:
Maintenance:
     Operation of U. S. hopper dredge Meade, fall, 1935, and spring,
       1936--------             ---------------------------------------   $12, 500
    Reinforce substructure and rebuild superstructure on 1,000 linear
       feet of north pier at $66 with United States plant, summer and
       fall, 1935---------------                                           66, 000
    Riprap breakwater and pier, 1,000 tons at $3.50 with United States
       plant during the fiscal year          ----------------------------   3, 500
                  Total        ----------------------------------------------                                                           82, 0001
                                                 Cost and financial summnary

Cost of new work to June 30, 1984                                                                                               $796, 242. 58
Cost of maintenance to June 30, 1934                                               ----------------------                        498, 169. 38
      Total cost of permanent work to June 30, 1934----------1, 294,411. 9
Minus accounts payable June 30, 1934_-----___-
                                             -    -_    ___-        109. 11

      Net total expenditures___                                                  --      __    -_                            1---______
                                                                                                                             1, 294, 302. 85
Unexpended balance June 30, 1934---                                           _____---___----__                                 23, 405. 95

             Total amount appropriated to June 30, 1934 _____________                                                       1. 317, 708. 80

             Fiscal year ending June 30                              1930                  1931          1932            1933           1934


Cost of new work----....--                       -------------------------------------------------------
Cost of maintenance         ------------------                   $21, 688. 21 $12, 131. 05 $16, 363. 60              $39, 199. 89     $54, 494. 20
Total expended...................----------------------14, 037. 14'                 '15,   813. 71     18, 615. 65    23,950. 60       71, 294. 64

Allotted ................                                          21, 500. 00
                                         ...........----------------------------     11, 000. 00        5, 700. 00    81, 695. 57      31, 300. 00


Balance unexpended July 1, 1933_____________________---_ $63,400.59
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934   --------------------- $17, 500. 00
Amount allotted from War Department Appropriation
  Act approved July 14, 1932____-------- ---           5, 000. 00
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933 _   .________-----------   9, 000. 00
                                                                  31, 500. 00

     Amount to be accounted for_____---__-----                                                                                      94, 900. 59
Deductions on account of revocation of allotment                                                     _____-----            __           200. 00
             Net amount to be accounted for------                                                                                       700. 59
                                                                                                                                    9--------4,
1098       REPORT OF          CHIEF      OF ENGINEERS,            U.   S. ARMVIY,      1934

Gross amount expended-_______--- ____---------    $72, 787. 72
Less reimbursements collected--------------------   1,493. 08
                                                                                            $71, 294. 64

      Balance unexpended June 30, 1934---------------------- 23, 405. 95
Outstanding liabilities June 30, 1934_-11       1        1          109. 11
                                                         111-------------

        Balance available June 30, 1934-----------------------                              23, 296. 84

Amount (estimated) required to be appropriated for completion of
                                                  - - - - - - - - - - - -- - - - - - - - - - -
existing project - - - - - - - - - - -- - - -- -                                              60, 000. 00

Amount that can be profitably expended in fiscal year ending June
                                       -     -                  -
30, .1936, for maintenance 1 _ __________ -   ___- -   ___      _ 82, 000.00
26.   'PORTAGE      LAKE HARBOR OF REFUGE, MANISTEE COUNTY, MICH.

  Location.-On the east shore of Lake Michigan, distant about 186
miles northeasterly from Chicago and about 37 miles northerly
from Ludington. (See U. S. Lake Survey Chart No. 777.)
  Existing project.-This provides for a harbor of refuge, with an
entrance channel from Lake Michigan to Portage Lake, 300 feet
wide and 18 feet deep, protected by timber crib and pile piers and
revetments. Concrete paving has been placed on 851 feet of the
north pier and 901 feet of the south pier. The project depth is
referred to low-water datum for Lake Michigan, which is taken
at 578.5 feet above mean tide level at New York. The fluctuations of
water level are seasonal changes of about one-half foot above or
below the annual mean stage, and extreine fluctuations of a tem-
porary nature, due to wind and barometric pressure, of about 1/2
feet above or below the mean lake level prevailing at the time.
  ..The estimate of cost for new work, revised in 1902, was $344,300.
There is no approved estimate for annual :maintenance.
   The existing project was adopted by the River and Harbor Act
of March 3, 1879 (Annual Report for 1879, p. 1634). The latest
published map is in House Document No. 558, Sixty-fourth Con-
gress, first session.
   Recomm   nended modifications of project.-Legislation authorizing
the abandonment of the project for this harbor is recommended in
House Document No. 588, Sixty-fourth Congress, first session.
   Terminal facilities.-The main terminals are at the inner end of
Portage Lake, where there are inexpensive landing places. The
facilities are considered adequate for the existing commerce.
   Operations and results during fiscal year.-Operations consisted
of dredging 19,684 cubic yards to provide an entrance channel 14
feet deep at a cost of $2,521.99. Removing the top three courses of
old timber superstructure and paving with concrete on 850 linear
feet of the north and 900 linear feet of the south pier cost $16,342.43.
Placing 6,429 tons of stone as pier filling and riprap cost $12,049.72.
All work was done by hired labor and use of Government plant.
'The total cost was $30,914.14 for maintenance. The total net
.expenditures were $30,967.02.
  Condition at end of fiscal year.-Pier construction under existing
project was completed in 1901. The full project depth has never
been obtained. The controlling depth at low-water datum at the
close of the fiscal year was 14 feet on the entrance bar and in a
  1 Exclusive of available funds.
                RIVERS AND HARBORS-                            MILWAUKEE,              WIS., DISTRICT                            1099
channel about 80 feet wide between the piers to Portage Lake. The
costs of permanent work under the existing project are $256,129.21:
for new work and $191,733.29 for maintenance, a total of $447,862.50..
The total expenditures are $447,993.03.
   Proposed operations.--The balance unexpended at the close of the
fiscal year will be applied as follows:
Accounts payable June 30, 1934                                      $1, 053. 13
Maintenance :
    Operation of U. S. bucket dredge Tompkins, July 1934 and
      July 1935------------       -------------------------------    1, 329. 85
    Riprap piers with United States plant, 500 tons at $3.30 during
      the fiscal year ----------------                               1, 650. 00

         Total -----------    --         --------           4, 032. 98                                         -



   The available funds will be sufficient for maintenance of the
project to June 30, 1936, and no adidtional funds can be profitably
expended.
                                             Cost and financial summary

Cost of new work to June 30, 1934__                         $256, 129. 21
Cost of maintenance to June 30, 1934-----------------------191, 733. 29

      Total cost of permanent work to June 30, 1934-----------                                                         447, 862. 50
Value of plant, materials, etc., on hand June 30, 1934--                                                                   1,183. 66
      Net total cost to June 30, 1934   -----------------------                                                        449, 046.16
Miinus accounts payable June 30, 1934_______                                                                             1,-______________
                                                                                                                            053. 13
      Net total cost to June 30, 1934___-------------------   449, 046. 16
Unexpended balance June 30, 1934----------------------------4,032.98

            Total amount appropriated to June 30, 1934-----------452, 026.01

            FisJal year ending June 30                       1930          1931          1932              1933                 1934

Cost of new work .................... ...--- . .. ... .. ... .. ... .. _ .-                  . .     .     .       .     ..     .      .
Cost of maintenance.---.--..--.-..                 --..    $4, 043. 07   $6, 259. 04 ----------          $2, 548. 60          $30, 914. 14
Total expended----------...................----.........    4,043. 07     2, 172. 60   $4, 328. 16        2,384. 53            30, 967. 02
Allotted ...............-------------------------           6,000. 00                __
                                                                         4,000. 00 -----------            5,000. 00            28, 728. 67

Balance unexpended July 1, 1933---------------------------        $6, 271.33
Amount allotted from War Department Appropriation Act
  approved Apr. 26, 1934 --------------------------   $4, 000. 00
Amount allotted from War Department Appropriation Act
approved Mar. 4, 1933       ----------           __  25; 000. 00
                                                       ---------- 29, 000. 00

      Amount to be acounted for--     ------------------------                                                          35, 271. 33
Deductions on account of revocation of allotment _______------- -_                                                          271. 33
      Net amount to be acounted for-------------------------35,                                                                000. 00
Gross amount expended-------------------------- $31, 134. 26
Less reimbursements collected-------------------------   167. 24
                                                                                                                        30, 967. 02
      Balance unexpended June 30, 1934 ------------------------                                                           4, 032. 98
Outstanding liabilities June 30, 1934_ __________________________                                                         1, 053. 13
           Balance available June 30, 1934                                             ___                                2, 979. 85
1100    REPORT OF CHIEF OF ENGINEERS,        U. S.   ARMVIY,   1934

                   27. FRANKFORT HARBOR., MICH.

    Location.-This harbor is on the east shore of Lake Michigan, dis-
tant about 204 miles northeastery from Chicago and about 28 miles
northerly from Manistee. (See U. S. Lake Survey Chart No. 77.)
    Existing project.-This provides for an exterior basin in Lake
Michigan, formed by two breakwaters, 450 feet apart at the outer
ends, diverging at an angle of about 900, the main arm and the shore
connection of the north breakwater being 972 feet and 1,000 feet in
length, respectively, and the main arm and the shore connection of
the south breakwater being 1,190 feet and 1,400 feet in length, respec-
tively; for the removal of 801 feet from the north and 1.172 feet from
the south pier; dredging the basin 20 feet deep and 800 feet wide at
the entrance, decreasing toward the new pierheads to 600 feet wide;
and dredging the channel between the piers 18 feet deep to Lake
Betsie (Aux Becs Scies). The breakwaters and shore connections are
built of concrete caissons and piling capped with concrete. The inner
piers and revetments are built of timber cribs and piling, the inner
459 feet of the south revetment having been capped with concrete.
    The project depth is referred to low-water datum for Lake Mich-
igan, which is taken at 578.5 feet above mean tide level at New York.
'The fluctuations of water level are seasonal changes of about one-half
:foot above or below the annual mean stage, and extreme fluctuations
of a temporary nature, due to wind and barometric pressure, of about
11/2 feet above or below the mean lake level prevailing at the time.
     The estimate of cost for new work, revised in 1932, was $1,687,000.
The estimated annual cost of maintenance (1923) is $15,000.
    The existing project was authorized by the following river and
harbor acts: The act of June 23, 1866, as amended in 1868, 1879, and
1892, provided for a new outlet 12 feet deep, protected bly piers and
revetments; the act of June 3, 1896, provided for a depth of 18 feet
  (Annual Report for 1902, p. 473); and the act of March 3, 1925,
provided for the exterior breakwaters, removal of portions of piers,
and present dimensions of channel (H. Doc. No. 208, 68th Cong., 1st
sess.). The latest published map is in the last-mentioned document.
     Local cooperation.-Compliedwith.
     Terminal facilities.-The railroad terminal, consisting of two car-
ferry slips, is on the south side at inner end of the entrance channel.
The end of a city street is available for public use. The facilities
are considered adequate for the existing commerce, practically all of
which is by car ferry.
    iOperations and results during fiscal year.-Operations consisted
of dredging 22,034 cubic yards for restoration of project depth at
a cost of $2,681.20. Placing 2,957 tons of stone for riprap along the
breakwaters cost $5,528.95. Rebuilding superstructure, in concrete,
on 1,218 linear feet of north and south crib piers, in progress at the
  close of the fiscal year, cost $28,906.68. Rebuilding substructure and
  placing concrete superstructure on 412 linear feet of north revet-
  ment and wing wall, in progress at the close of the fiscal year, cost
  $8,756.76. All work was done by hired labor and use of Govern-
  ment plant. The total cost was $45,873.59 for maintenance. The
  total net expenditures were $52,266.66.
     Condition at end of fiscal year.-The project for the arrowhead
  type of harbor was completed in 1932. Construction of the south
                RIVERS AND                    TIARBORS-MILWAUKEE, WIS., DISTRICT                                       1101
breakwater and shore connection, removal of south pier, and dredg-
ing south half of channel were completed in 1931. The north break-
water and shore connection and the remainder of the pier removal
and dredging was commenced on April 11 and completed November
7, 1932. The remaining portions of the inner piers and revetments
are being repaired. The controlling depth at low-water datum at
the close of the fiscal year was 20.5 feet in the channel through the
outer basin over a middle width of 450 feet and in the channel be-
tween the inner piers to Lake Betsie. The costs of permanent work
under the existing project are $1,692,838.97 for new work and $351,-
813.26 for maintenance, a total of $2,044 652.23.                                               The total expendi-
tures are $2,039,620.65.
   Proposedoperations.-The balance unexpended will be applied as
follows:
Accounts payable June 30, 1934___---------------------------                                                      $5, 497. 85
Maintenance :
    Operation of U. S. hopper dredge Meade, June 1935------------                                                 12, 000. 00
    Complete reinforcing substructure and rebuilding superstructure
      on 1,615 linear feet of the north and the south inner piers and
      revetment with United States plant, September 1934----------                                                58, 763. 24
    Riprap breakwaters, 4,000 tons at $3.50, with United States plant,
      August 1934-May 1935------------------------------------                                                    14, 000.00
    Refill and pave south shore connection with United' States plant,
      August 1934-
               194-----------------------------------------4
               Augut            ____________________                                                                   0.0 00
                                                                                                                   4, 000.

               Total------------------------------- ----                                                          94, 261. 09
    Dredging is required annually for maintenance of project dimen-
sions of channel. The breakwaters require some additional riprap.
The additional sum of $13,000 can be profitably expended during the
fiscal year ending June 30, 1936, as follows:
Maintenance :
   Operation of U. S. hopper dredge Meade, June 1936_____---___       $7, 750. 00
    Riprap breakwaters, 1,500 tons at $3.50, with United States plant
      during the fiscal year--------------------------------------     5, 250. 00

               Total-------------------------                                  ------------------                 13, 000.00
                                              Cost and financial summary
Cost of new work to June 30, 1934-___---------------------                                                  $1, 692, 838. 97
Cost of maintenance to June 30, 1934_--------------------------                                                 351, 813. 26

      Total cost of permanent work to June 30. 1934------------                                              2, 044, 652. 23
Value of plant, materials, etc., on hand June, 30, 1934 .........                                                 8, 6C0. 89

      Net total cost to June 30, 1934 ________-- _----------                                                 2, 053, 253. 12
Minus accounts payable June 30, 1934 ----------------------                                                      13, 632. 47

      Net total expenditures___ ___---------------------     2, 039, 620. 65
Unexpended balance June 30, 1934 ---------------------------     94, 261. 09

           Total amount appropriated to June 30, 1934                                       ---              2, 133, 881. 74

    Fiscal year ending June 30                    1930            1931             1932              1933            1934


Cost of new work.........-------------.....    $200, 252. 77   $457, 290. 50    $203, 082.46      $332, 506. 50   ----------
Cost of maintenance--...               -         14, 995. 33     14, 339. 94       8, 879. 80        4, 251.04      $45, 873. 59

        Total cost...--------------             215, 248. 10    471, 630. 44     211, 962. 26      336, 757. 54      45,873. 59

Total expended .........--------------...       160, 997. 56    441, 711.96      222, 563. 26      393, 895. 18      52, 266. 66
Allotted.......-------------------              283, 000. 00    395, 000. 00    -65, 000. 00       206, 465. 00     133, 113. 38
1102     REPORT OF CHIEF OF ENGINEERS, TU. S. ARMY,                   1934

Balance unexpended July 1, 1933_____                           $13, 414.37
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934--------------------$76,000. 00
Amount allotted from War Department Appropriation
                         --------- _---------
Act approved Mar. 4, 1933                         58, 000. 00
                                                               134, 000. 00

      Amount to be accounted for ______ __         ___-___ -         -____147, 414. 37
Deductions on account of revocation of allotment____-.    __--   -             886.62
      Net amount to be accounted for------------------------146,     527. 75
Gross amount expended ---------         --       --          -__ 52, 266. 66

      Balance unexpended June 30, 1934- --.        ___-- -      _____ 94, 261. 09
Outstanding liabilities June 30, 1934----------------      $5, 497. 85
Amount covered by uncompleted contracts-------- ----        8, 134. 62
                                                                       13, 632. 47

       Balance available June 30, 1934_____.       ______---___        _   80, 628. 62

Amount that can be profitably expended in fiscal year ending June
                            1 - -
30, 1936, for maintenance ____
                                  -
                                     _______________ -        ___          13, 000. 00

  1 Exclusive of available funds.

                       28. CHARLEVOIX     HARBOR,     MICH.

   Location.-On the east shore of Lake Michigan, distant about
276 miles northeasterly from Chicago and about 75 miles northerly
from Frankfort. (See U. S. Lake Survey Chart No. 789.)
   Existing project.-This provides for a channel 15 feet deep from
Lake Michigan to Lake Charlevoix protected where needed by piers
and revetments. The piers at the entrance are formed of stone-filled
timber cribs and rubblestone, being 781 feet and 452 feet in length
on north and south sides, respectively. The revetments are built of
piling.
   The project depth is referred to low-water datum for Lake Michi-
gan, which is taken at 578.5 feet above mean tide level at New York.
   The fluctuations of water level are seasonal changes of about one-
half foot above or below the annual mean stage, and extreme fluctua-
tions of a temporary nature, due to wind and barometric pressure,
of about 11/2 feet above or below the mean lake level prevailing at
the time.
   The estimate of cost for new work, revised in 1902, was $186,000.
The latest (1928) approved estimate of cost for annual maintenance
is $8,000.
   The existing project was authorized by the following river and
harbor acts: The act of August 14, 1876, provided for the channel
from Lake Michigan to Round Lake; the act of August 2, 1882,
provided for the channel from Round Lake to Lake Charlevoix; the
act of June 13, 1902, increased the project depth from 12 to 15 feet.
The latest published map is in House Document No. 26, Sixty-third
Congress, first session.
   Terminal facilities.--There is one wharf in the city of Charlevoix,
at the inner end of the south revetment, which is open to general use,
and a coal wharf at Boyne City at the inner end of Lake Charlevoix.
The facilities are considered adequate for the existing commerce.
              RIVERS AND HARBORS-MILWAUKEE,                                  WIS., DISTRICT              1103
   Operations and results during fiscal year.-Operations consisted
of dredging 23,926 cubic yards for restoration of project depth at a
cost of $2,623.72. Placing 991 tons of stone for repairs to north
rubble-mound pier cost $2,346.63. All work was done by hired labor
and use of Government plant. The total cost was $4,970.35 for main-
tenance. The total net expenditures were $5,456.63.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1902 at a saving of $105,795 under the estimated cost. The
north revetment of the lower channel is in poor condition. The
south revetments of the lower and upper channels were repaired
and provided with concrete superstructure in 1930. The outer 303
feet of the north pier and 452 feet of the south pier have been covered
with a concrete slab deck. The controlling depth at low-water datum
at the close of the fiscal year was 16 feet in the lower channel and 15
feet in the upper channel to Charlevoix Lake. The costs of perma-
nent work under the existing project are $80,205.04 for new work and
$276,019.18 for maintenance, a total of $356,224.22. The total expen-
ditures are $356,769.45.
   Proposed operations.-The balance unexpended, $5,416.87, will be
applied to maintenance operation of U. S. hopper dredge Meade, dur-
ing July 1934.
   Dredging is required annually for maintenance of project dimen-
sions of channel. The north revetment is badly decayed and re-
quires extensive repairs as soon as funds are made available. The
additional sum of $33,000 can be profitably expended during the
fiscal year ending June 30, 1936, as follows:
Maintenance:
    Operation of U. S. hopper dredge Meade, July 1935_-- __--    __-- -$5,  400
   Reinforce substructure and rebuild superstructure on 600 linear feet
      of north revetment at $46, with United States plant, summer 1935_ 27, 600
             Total---------             --- ---------------------------------------                     33, 000

                                   Cost and financial summary


                                                                 ___-------------------
Cost of new work to June 30, 1934____________________________ $80, 205.04
Cost of maintenance to June 30, 1934--_                       276, 019.18

      Total cost of permanent work to June 30, 1934-------------356, 224. 22
Value of plant, materials, etc., on hand June 30, 1934 _______--__   545. 23
          Net total cost to June 30, 1934--__ ______--                 _______---_                  356, 769. 45

Net total expenditures----------------------------------356,                                            769. 45
Unexpended balance June 30, 1934_____--. - __---_____ ______                                          5,416.87
          Total amount appropriated to June 30, 1934____________                                    362, 186.32

    Fiscal year ending June 30            1930            1931           1932          1933             1934


Cost of new work----.... ---                     -------------------------------------------------
Cost of maintenance----..   --------........
                                     $23,878.74         $51, 076. 28   $10, 496. 07   $2, 667. 38       $4, 970. 35
Total expended------------------         25, 039. 36     50, 227. 10    10, 580. 32    2, 330. 64        5, 456. 63
Allotted----------------------          117, 000. 00   -34, 783. 42      3,000.00      1,950. 0 (        5, 350.00

         91536-ENo 1934            70
1104        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

Balance unexpended July 1, 1933----------------                 $5, 523.50
Amount allotted from War Department Appropriation Act
approved Apr. 26, 1934----------------------------    $500. 00
Amount allotted from War Department Appropriation Act
approved Mar. 4, 1933-----------------               5, 000.00
                                                                 5, 500. 00

     Amount to be accounted for----------------------------11,                                                   023. 50
Deductions on account of revocation of allotment-----------------                                                150. 00

      Net amount to be accounted for--------------------------- 10, 873.50
Gross amount expended ---------------------------      $5, 46. 2
Less reimbursements collected---------                      11. 63
                                                                   5, 456. 63

          Balance unexpended June 30, 1934 ----------------------                                              5, 416. 87

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance_------------------------------------ 33, 000. 00

   29. EXAMINATIONS, SURVEYS, AND CONTINGENCIES (GENERAL)

   The cost of work during the year was $9,373.28, and the expendi-
tures were $9,388.34. The balance unexpended together with allot-
ment made during June 1934 will be applied as needed during the
fiscal year 1935 to payment of expenses to be incurred in connection
with the above items. The additional sum of $8,000 can be profit-
ably expended during the fiscal year ending June 30, 1936.
                                              Cost and financial summary

Cost of maintenance to June 30, 1934------------------------ $48, 271.. 93
Plus accounts receivable June 30, 1934-------------------------    79 44

     Gross total costs to June 30, 1934 ----------------------- 48, 351. 37
Minus accounts payable June 30, 1934--------------------------      390. 62
     Net total expenditures   -------------------------------                                                 47, 960. 75
Unexpended balance June 30, 1934----------------------  -------                                                7, 169. 25
         Total amount appropriated to June 30, 1934--------------                                             55, 130. 00

         Fiscal year ending June 30                    1930            1931         1932          1933            1934


Cost of new work ....
Cost of maintenance-       ----------------          $7, 275. 46   $14, 469. 42   $8, 064. 68   $6, 617. 94      $9, 373.28
T:6talepended_---------------------                   7, 188.23     14,491.69      6, 8468.07    7, 575.27       '9,388. 34
              ----
Allotted-........                 .------------------
                                                   6, 000. 00       16, 000.00 -----------       6, 830. 00      16, 000. 00


Balance unexpended July 1, 1933------------------------------$557.59
Amount allotted from War Department Appropriation Act
  approved Apr. 26, 1934------ ------------------     $4, 000.00
Amount allotted from War Department Appropriation Act
  approved Mar. 4, 1933--------------------------13,      000. 00
                                                                  17, 000.00

     Amount to be accounted for-------------------------                                                      17,557.59
Deductions on account of revocation of allotment----------------                                               1, 000. 00
         Net amount to be accounted                        for---------                         -___16, 557.59

   1Exclusive        of available funds.
            RIVERS AND HARBORS-MILWAUKEE,                                       WIS.,      DISTRICT             1105
Gross amount expended--------------------------                                          $9, 388. 63
Less reimbursements collected----------------------                                              .29
                                                                                                           $9, 388. 34

      Balance unexpended June 30, 1934     -----------------------                                          7, 169. 25
Outstanding liabilities June 30, 1934-----------------------------                                             390. 62

      Balance available June 30, 1934           -----------------------                                     6, 778. 63
Accounts receivable June 30, 1934-----------------                                                              79. 44

        Unobligateds balance ayailable June 30, 1934--------------6,                                           858. 07

Amount that can be profitably expended in fiscal year ending June
                                -- - - - - - - - - - - - - - - - - - - - - - - - - - - - -
30, 1936, for maintenance 1                                                                                 8, 000. 00

                30. Other projects for         'which      no estimates are submitted

                    [Commercial statistics for these projects are given in pt. 2 of report]

                                                           For last      Cost and expenditures to
                                                           full re-            June 30, 1934                Estimated
                          Name
                          of project                       port see                                         amount re-
                   Name of project                         annual                                            quired to
                                                           report        New work        Maintenance         complete
                                                            for-

1. Gladstone Harbor, Mich.......--------------------1912                   $7, 280. 59        $252. 17     Completed.
2. Ocoiito Harbor, Wis.2 ....................          i1933              130, 753. 72      18, 976. 93       Do.
3 St. Joseph River,  1Wich.',---
                               .-...      .   ...-.    -1923                4, 555. 49       5, 194. 51       Do.
4.: PetoAiey Harbor, Mich.....        ..     ------..........
                                                    ..   1931             118, 239. 40      75 044. 02        Do.

  1 Channels adequate for commerce, abandonment recommended in 1926 (H. Doc. No. 467, 69th Cong.,
1st sess.).
  2Channel adequate for commerce.
  8- roject provides only for breakwater which was completed in 1908; superstructure ras rebuilt in con-
orete and structure fully riprapped in 1930.

   Status of reports called for by river and harbor acts and committee resolutions


        Locality              Authorization act         Transmitted
                                                        to Congress               Doec. No.               Recommenda-
                                                                                                              tion


Grand Haven Harbor         Rivers and Harbors
and Grand River,            Committee resolu-
Mich.                       tion, Mar. 20, 1934.
Grays Reef Passage,        Rivers and Harbors           Aug. 21, 1934                                     Favorable.
Mich.                       Committee resolu-
                             tion, Jan. 5, 1934.
Kenosha Harbor, Wis__      Rivers and Harbors
                             Committee resolu-
                             tion, Jan. 29, 1934.
Leland Harbor, Mich___     Rivers and Harbors
                             Committee-. resolu-
                            Stion,-Feb 8, 1934.
Mnistee Harbor, Mich_      River ''aidTHarbor           July   6, 1933                                    Unfavorable.
                             Act, July 3, 1930.
Manistique     Harbor,     Rivers and Harbors
Mich.                       Committee resolu-
                             tion, Apr. 3, 1934.
Manitowoc Harbor, Wis.     Rivers and Harbors           Apr. 27, 1934  Rivers and Harbors                 Favorable.
                             Committee resolu-                              Committee, 39, 73d
                             tion, June 2, 1933.                           Cong., 2d sess.
Menominee Harbor and       Rivers and Harbors           Jan. 25,1934Rivers and Harbors                       Do.
River, Mich.and Wis.        Committee resolu-                             Committee, 28, 73d
                             tion, Apr. 29, 1933.                          Cong., 2d sess.
Michigan Lake to Mis-      River and Harbor             Jan. 18,1934 .......................              Unfavorable.
sissippi River Water-       Act, July 3, 1930.
way via Green Bay
Harbor, Fox River,
and connecting waters;
the Portage Canal and
Wisconsin River, Wis.

  1 Exclusive of available funds.
 1106      REPORT OF CHIEF               OF ENGINEERS, U.              S. ARMY,       1934

      status of reports called for by river and harbor,acts and committee
                              resolutions--Continued


        Locality            Authorization act       Transmitted         Do. No.           Recommenda-
                                                    to Congress                                tion

Milwaukee Harbor,         Rivers and Harbors
Wis., inner harbor.        Committee resolu-
                            tion, May 18, 1934.
Muskegon Harbor,          fRivers and Harbors ..
Mich.                      Committee resolu-
                            tion, June 15, 1934.
Oconto Harbor, Wis.... Rivers and       Harbors
                           Committee resolu-
                           tion, June 2, 1933.
Pensaukee Harbor, Wis- ....do------------ Mar. 7,1933 ..-     ----- --.-.-                 Unfavorable.
Pentwater Harbor, Rivers and Harbors
  Mich.                    Committee resolu-
                           tion, Feb. 8, 1934.
Racine Harbor, Wis ....Rivers and Harbors
                           Committee resolu-
                           tion June 13, 1934.
St. Joseph River, Mich__ Senate Committee res- May 3, 1934 ....-----------------------        Do.
                           olution, Sept. 1, 1933.
Sheboygan Harbor, Rivers and Harbors
  Wis.                     Committee resolu-
                           tion, Feb. 16, 1933.
South Haven Harbor, Senate Committee res- ..........-- -------------
  Mich.                    olution, Dec.20,1933.
Sturgeon Bay and Lake Rivers and Harbors                    _
  Michigan Ship Canal,     Committee resolu-
  Wis.                     tion, May 10, 1934.
Two Rivers Harbor, Rivers and Harbors Jan. 3,1934 Rivers and Harbors Favorable.
  Wis.                     Committee resolu-                   Committee, 25, 73d
                           tion, June 10, 1933.                Cong., 2d sess.
White Lake Harbor, Senate Committee res- _..              .       ...---------------------
  Mich.                    olution, May 23,1934.


   IMPROVEMENT OF RIVERS AND HARBORS IN THE
            DETROIT, MICH., DISTRICT
  This district includes the lakes, rivers, and harbors along the east
coast of the State of Michigan and northwest portion of the State
of Ohio from St. Marys River on the north to Port Clinton Harbor
on the south, both inclusive.
  District engineer: Maj. R. C. Crawford, Corps of Engineers.
  Division engineer: Col. E. M. Markham, Corps of Engineers, to
October 18, 1933. Lt. Col. Max C. Tyler, Corps of Engineers, since
that date.
                                           IMPROVEMENTS

                                             Page                                                  Page
1. St. Marys River, Mich _____               1106       8.   Saginaw River, Mich _____             1139
2. Operating and care of St.                            9.   Harbor of Refuge at Harbor
       Marys Falls Canal, Mich_             1114               Beach, Lake Huron, Mich_            1141
3. Channel between Mackinac                           10.    Black River, Mich ........            1143
      Island and Round Island,                        11.    Rouge River, Mich________             1145
       Mich                                  1123     12.    Monroe Harbor, Mich.....              1147
4. St. Clair River, Mich______               1117     13.    Toledo Harbor, Ohio____ __            1150
5.' Channels in Lake St. Clair,                      14.    Examinations, surveys, and
      Michigan--------------                1123               contingencies (general) --          1155
6. Detroit River, Mich _____                1129      15.    Other projects for which no
7. Alpena Harbor, Mich_____ .               1137               estimates are submitted__           1156

                              1. ST. MARYS           RIVER, MICH.

  Location.-This river flows from the eastern end of Lake Superior
into the northern end of Lake Huron. (See U. S. Lake Survey
Chart No. 9.)
                RIVERS AND HARBORS-DETROIT,                             MICH.,       DISTRICT               1107
   Previous projects.-Authorized by the acts of July 8, 1856, June
14, 1880, August 2, 1882, and August 5, 1886. The total cost and
expenditure prior to the adoption of the existing project in 1892 was
 $2,904,807, all for new work. (For further details see p. 1956,
Annual Report for 1915.)
   Existing project.-This provides for channels through St. Marys
River, which, at low-water datum, are suitable for vessels drawing
20 feet when upbound and 24 feet when downbound, with a least
width of 500 feet in the upbound and 300 feet in the downbound
routes. The specific improvements embrace channels through 3
shoals between Lake Superior and the head of the falls, having
minimum widths of 1,000 feet with depths at low-water datum of
27 feet through Round Island Shoals and Middle Ground and 26
feet through Vidal Shoals; constructing 4 locks, 2 canals, and an
emergency dam for each of the canals at the falls; deepening and
widening the tailrace of the United States power plant; constructing
remedial works at the inlet of the power canal of the Michigan
Northern Power Co.; constructing compensating works at the falls;
dredging through shoals between the lower end of the canals and the
upper entrance to Lake Nicolet, including extension of anchorage
and maneuver area below the locks and the widening of angle at
Light No. 27; dredging to widen and deepen the upper entrance
channel into Lake Nicolet; excavating channels from Lake Nicolet
to Lake Munuscong on either side of Neebish Island, a distance via
West Neebish of 14 miles and via Middle Neebish 15 miles, the Mid-
dle Neebish, or upbound, route to have a least width of 500 feet and
the West Neebish, or downbound, route 300 feet; and dredging shoals
between Lake Munuscong and the mouth of the river. The following
table shows the principal features of the four locks and emergency
dams. All structures are located at Sault Ste. Marie, Mich.:

                                                     Weitzel Lock)    Poe Lock       Davis Lock       Fourth Lock

Miles above mouth ----------      -------                      47               47              47                 47
Clear width of chamber ..------------- feet__          60 at gates             100              80                 80
Length between miter sills ...............- do---           515               800           1, 350            1, 350
L ift I ... .. .. .. .. ... .. .. .. . ....do .. .-       20. 5              20. 5           20. 5             20. 5
Depth on upper breast wall I ......... do --                 16                22            24. 5             24. 5
Depth on lower breast wall I____________ do -             12.6                 18            24. 5             24. 5
Foundation ...-....   .....-.-        ......             Rock               Rock            Rock              Rock
Type of construction_                   - -         Masonry            Masonry          Concrete          Concrete
Estimated cost.............................
Actual cost -$983,
                                                 . $1, 160, 000      2$4, 738, 865   3 $6, 200, 000    4 $3, 275, 000
                                                            335       $2, 837, 337    $2,200,000         $1,750, 000
Completed                                                    1881            1896             1914              1919

      Emergency dams                         South Canal                             North Canal

Miles above mouth--------          47 -------.----                     47.
                                                      ..................
Estimated cost     _____ _______   $240,000 .-- .............          $300,000.
Type_ _           -----            Swing bridge, sliding wickets ..... Removable trusses, revolving wickets.
Co st, com p le ted - .........    $294,608.16        --               $269,224 .31.
Year completed-.-----------        1911- -        -                    1922.

I  At low water, 601.1 above and 580.6 below.
2  Includes cost of deepening and enlarging South Canal.
3  Includes cost of North Canal.
  4 Includes canal excavations to provide necessary approaches to lock,canal walls, and piers, and emer-
gency dam.
SOpened to commerce.
SIncluding engineering, oflice, and inspection.
NOTE.--The limiting draft to the locks is determined by the depth over thebreast walls.
1108              REPORT              OF CHIEF              OF ENGINEERS,                     U.       S.     ARMY,         1934


    In      the        following            table        are         stated          other    characteristic                    features           of
the improvements belonging                                      to     the      existing           project:



                                                             Dis-             Used by                                                   Project
                                                            tance              up- or        Project          Project Improved           planes
    Name of improved channel                        Length from                down-                          Project Improved           planes
                                                           mouth               bound         width             depth    depth          above  sea
                                                           of river           vessels                                                 level,
                                                                                                                                         YorkNew


                                                     Feet       Miles                     Feet                 Feet   Feet        Feet
Round Island Middle Ground-........                       ..        59 Both........._________                   27      27           601. 5
Round Island Shoal No. 1 ..-                         5,000          59 - do...              1,000               27      27           601.5
Round Island Shoal No. 2              -..--.         9, 800         57 ____do....           1, 000              27      27           601. 5
Vidal Shoals______________________                   9,100          52 -. do          ----
                                                                                     1, 000-1, 500              26      26            601. 2
South Canal------------------8, 235                                 47          do......-----------------               ---------------
    West approach .------------------                          ----------. _____                    1 108   24          24           601. 1
    Weitzel Lock-----                          .....-...-----------                                      60 12. 6       11. 4         579. 4
    Poe Lock            .......--------------------------------                 -                       100 18          16. 8         579. 4
    East approach            ------------------ ____________                ---                         340 19.5        18.3 ,        579.4
    E---oc-----.----.-
North   Canal...-----  -------------
                          ..                      8, 520            47 Both             .----
                                                                                          -----------.
    West approach______            ______________ ____..-----                          _                280 24          24            601.1
    Davis Lock ___________ ____.______  ......                   ____ ..                                 80 24. 5       23. 3        579. 4
    Fourth Lock ____.....____         .....---------- ..--.                                              80 24. 5       23. 3        579. 4
    East approach .....                                               .            --                   312 24. 5       23. 3         579. 4
Course 1, Bayfield Channel, an-                   9, 237            46 Both               1, 300-1, 500     26          20. 9         579. 3
  chorage and maneuver area.
Courses 2 and 3, Little Rapids-...               24, 193            41 __do ...                        600  25          19. 9 579. 2-578. 9
Lake Nicolet_______                              22, 000            37 -__-do _                     1, 500  26          24. 9        578. 8
Middle Neebish (upbound route):
    Course 5, lower end of Lake 17, 900                             33 Up-...-                          500 21          20. 3         578. 8
      Nicolet.
    Course 6, dike                               16, 918            30 _ do....                         500 21    20. 5-20. 9 578. 7-578. 6
    Course 7, Munuscong Chan- 17, 586                               27 _-do...                          500 21          20. 5        578. 6
      nel.
    Course 9, Sailors Encamp- 12, 400                               23      .. do                       500 21    20. 5-20. 9        578.5
      ment Channel.
West Neebish (downbound route):
    Course 4, lower end of Lake 10, 762                             35 Down___                          300 25          23.9         578.
      Nicolet.
    Course 5, lower end of Lake 23, 370                             30 .--. do .                        300 25          23. 9        578. 8
      Nicolet.
    Course 6, Rock Cut                 .---------14, 064            28        ---.
                                                                                do ...                  300 27          26. 9 578. 7-578. 6
    Course 7 ________                            13, 270            25 ___ do ...                       300 25          23. 9        578. 5
    Course 8, Moon Island-_                      12, 600            23 _ do....                         300 25          23.9         578. 5
Lake Munuscong, Twin Island to 26, 459                              14 Both ....                    1, 000  26          21. 5        578. 5
  Lime Island.
Crab Island Shoal-------------- 1, 300                                  ...                          ...
                                                                                do..----.....--------...    26          26. 9        578. 5

  1 2 channels past Bridge Island, each 108 feet wide; minimum width of connecting channel 304 feet.

                                                     Project cost estimates

                                                                                                                           Year       Amount of
                                                                                                                           made        estimate


Round Island Shoals 1 and 2 and Vidal Shoals (dredging channel)---------------                                              1891              $85, 487
Vidal Shoals Channel (widening)                     ...........---------------------------------------..                    192               298,000
Round Island Middle Ground (dredging)-- ..---. ___-----.----                                __---------------__.            1925              802, 000
Weitzel Lock, including deepening canal                                              .____.......___
                                                                                       ___.....-
                                                                                               ........-                    1878           2, 460, 000
Poe Lock _           ---------------------------------------------------                                                    1886           4, 738, 865
Canal widening           ------------------------------------------------------                                             1904           1,020, 000
Davis Lock ---------           --------------                ---------------------------------                              1906           6, 200, 000
Fourth Lock                      -------------------------------------                                                      1910           3, 275, 000
Extension northwest pier_____________ ________________ ________                                   _____. __-..              1925              277, 000
Ship channel         --------------------------------------------------------                                               1891              556, 333
Lake Nicolet (Hay Lake) and Neebish Channels________--                                                                      1900           5, 750, 000
Extension anchorage and maneuver area below locks_.._                                      _                                1920              245, 000
Middle Neebish route (widening channels)____________________________----------                                              1925           3, 842, 000
Downbound route (deepening channels) ------------------------.......                                                        1928           8, 006, 300

         Total -   -         _-_- -    --                   -         -         -      -       -      - - -           -   I -              37, 555, 985
          RIVERS AND   HARBORS-DETROIT,      MICH.,   DISTRICT    1109
    The project depths are referred to low-water datums for Lakes
Superior and Huron, which are taken at 601.6 and 578.5 feet above
mean tide level at New York.
    Each year the St. Marys River rises and falls about 1 foot as meas-
ured by the monthly mean levels. Since 1860 the difference be-
tween the highest and lowest monthly mean levels above the locks
has been about 33/4 feet, and below the locks about 7 feet. From,
day 'to day the 'level fluctuates' somewhat,due 'to wind and baron
metric pressure, such changes frequently amounting to several inches
and sometimes to a foot or more. In addition to these changes in
level, occasionally a considerable oscillation takes place within 2
or 3 hours, which is somewhat in the nature of a seiche; such changes
amounting to over 5 feet have been known to occur within 3 hours.
    The estimate of cost for new work, revised in 1932, is $33,000,000,
exclusive of amounts expended on previous projects. The latest
  (1930) approved estimate for annual cost of maintenance, not includ-
ing operation and care of the locks, is $75,000.
    Tailrace deepening: The River and Harbor Act of March 4, 1915,
provided for the deepening and enlargement of the tailrace of the
United States power plant between the power house and deep water
at the foot of the rapids, a distance of about 2,250 feet, estimated
cost $150,000, and authorized the diversion for this purpose of so
mutih as might be necessary of the unexpended balance of appropria-
tions for the Davis Lock.
    The existing project was authorized by the following river and
harbor acts: The act of July 11, 1870, provided for the Weitzel Lock
and improving the existing State canal by widening and deepening
in accordance with report by Maj. O. M. Poe, Corps of Engineers,
United States Army, not published; the act of August 5, 1886, pro-
vided for the Poe Lock (H. Doc. No. 72, 49th Cong., 2d sess.); the
act of July 13, 1892, provided for dredging through the shoals above
the falls and the shoals below the falls between the lower end of the
canal and the upper entrance channel into Hay Lake, now Lake Nico-
let (H. Ex. Doc. No. 207, 51st Cong., 2d sess., and Annual Report for
1891, p. 2810) ; the acts of June 13, 1902, and March 3, 1905, provided
for enlarging the old canal (H. Does. Nos. 128, 56th Cong., 2d sess.,
and 215, 58th Cong., 3d sess.); the act of March 2, 1907, provided
for the Davis Lock and second canal and emergency dam (plan 3,
H. Doc. No. 333, 59th Cong., 2d sess.); the act of July 25,' 1912, pro-
vided for the fourth lock (H. Doc. No. 64, 62d Cong., 1st sess.); the
act of September 22, 1922, provided for the widening of the upper
approach to the canals through Vidal Shoals, and the extension of
anchorage and maneuver area below the locks (report of district
engineer, dated Oct. 29, 1920, printed in H. Rept. No. 775, 67th
Cong., 2d sess., pp. 30-32); the act of March 4, 1915, provided for
deepening the tailrace of the power plant; the act of March 3, 1909,
provided for the lease of water power at the falls and the lease
entered into with the Michigan Northern Power Co. provided for
the construction of remedial and compensating works; and the act
of June 13, 1902, provided for the Hay Lake and Neebish Channels
work in that section of the river below the locks (H. Doc. No. 128,
56th Cong., 2d sess.). The act of January 21, 1927, provided for
removal of Round Island Middle Ground, extension of Northwest
Canal Pier, and widening channels Middle Neebish route (H. Doc.
1110     REPORT OF CHIEF OF ENGINEERS,           U.   S.   ARMY,   1934


No. 270, 69th Cong., 1st sess.). The act approved July 3, 1930, pro-
vided for deepening channels throughout the downbound route (H.
Doc. No. 253, 70th Cong., 1st sess.). The latest published map is in
the last-mentioned document.
   Terminal facilities.-This improvement serves the through com-
merce between Lake Superior and the lower lakes, and it has not
materially influenced the terminal facilities at the towns along its
route, which consist only of small docks for the accommodation of
local traffic.
   Operations and results during fiscal year-Regular funds-New
work-Deepening downbound channel.-Operations under continu-
ing contracts were in progress under the following divisions of this
project: Vidal Shoals, 100 percent completed; Bayfield Channel,
about 89 percent completed; Angle Courses 1 and 2, Bayfield and
Little Rapids Channels, about 80 percent completed; Courses 2 and
3, Little Rapids Channel, about 95 percent completed; Lake Nicolet,
100 percent completed; Course 6 Rock Cut, West Neebish Channel-
clean up of misplaced material completed and channel opened to
navigation July 18. During the fiscal year 1,769,489 cubic yards of
material other than ledge rock and 10,124 cubic yards of ledge rock,
or a total of 1,779,613 cubic yards, were removed under contracts.
Ninety-five cubic yards of material removed from beneath coffer-
dams, Course 6 Rock Cut, West Neebish Channel, by U. S. derrick
boat Merganser.
   Maintenance.-Duringthe fiscal year, a total of 2,915 cubic yards
of material was removed from small shoals in channels above and
below the locks by U. S. derrick boat Merganser. Examination of
existing channels by sounding and sweeping was continued. Auto-
matic water-level gages were maintained and lake-level records
compiled.
  Public Works funds-New work.-Contractor's operations were in
progress deepening Lake Munuscong Channel, about 10 percent of
the work being completed. During the fiscal year 43,900 cubic yards
of material were removed.
   Total costs during the fiscal year were distributed as follows:
                              REGULAR FUNDS

New work: Deepening downbound channel---------------------$483,            298. 75

Maintenance:
   Dredging by United States derrick boats------------------           6,853. 52
   Miscellaneous surveys _________----------------------              17, 441. 93
   Water levels_------------------------------------------             5,427. 37
                                                                      29, 722,. 82

       Total new work and maintenance---___-------------             513, 021.57

                           PUBLIC WORKS FIUNDS

New work: Deepening downbound channels ------------------           -23,   357. 67

       Total all funds------------------------------------536,             379. 24
   The total expenditures were $568,570.19, of which $549,809.46 were
from regular funds and $18,760.73 from Public Works funds.
           RIVERS AND      HARBORS-DETROIT,         MICH.,   DISTRICT        1111
    Condition at end of fiscal year.-The existing project as modified
in 1930 is about 99 percent completed. The work remaining to be
done is the completion of the deepening of the downbound channel,
work on which is in progress. Above'the falls, from Lake Superior
to head of canal, there is a channel having a least width of 1,000 feet
and available depth of 26 feet below low-water datum of 601.6 at
Lake Superior and 601.1 at head of canal. At the falls there are four-
locks, reached by the north and south canals. The narrowest point
in the south canal, leading to Weitzel and Poe Locks, is at the inter-
national bridge crossing, where there are 2 channels, each 108 feet
wide. The depth in the canal leading to the Poe Lock is 24 feet.
The narrowest point in the north canal, leading to the Davis and
Fourth Locks, is at the international bridge crossing, where it is 280
feet wide. The depth of this canal is 24.5 feet, except near the west-
erly entrance, where it is 24 feet deep. The controlling dimensions
of locks are as follows: Weitzel Lock, width 60 feet, depth 12.6 feet;
Poe Lock, width 100 feet, depth 18 feet; Davis and Fourth Locks,
width 80 feet, depth 24.5 feet. The channels in the east or lower-
level approaches have depths as great as the locks to which they lead.
Each canal is provided with a movable dam for use in case of emer-
gency. Below the falls, from the locks to Lake Huron, there is a
channel with depth generally of 21 feet and width of not less than
600 feet where upbound and downbound traffic use the same channel,
and where traffic is separated not less than 21 foot depth and 300 foot
width in the upbound channel and not less than 25 foot depth and
300 foot width in the downbound channel.
   The West Neebish Channel was opened to navigation July 18, 1933.
   Data as to depths and widths of the several improved channels are
given in table on page 1108, under the general heading " Existing
project."
   Lake Munuscong Channel, whch is being improved with funds al-
lotted by the Public Works Administration, has a least depth of 22.6
feet and least width of about 2,300 feet.
   The costs from regular funds have been for new work
$31,638,440.87, and for maintenance $892,071.34, a total of
$32,530,512.21, and $23,357.67 for new work from Public Works
funds. The total cost, all funds, was $32,553,869.88. The total ex-
penditures were $32,590,533.02, including $18,760.73 from Public
Works funds.
   Proposed operations.-The balance unexpended, including ac-
counts receivable, at the end of the year ($197, 460.49) will be
applied as follows:
Regular funds: Accounts payable, June 30, 1934--------------- _       $77, 000. 00
New work:
   Completion of deepening of present channel through courses 2
      and 3, Little Rapids, under continuing contract in force; esti-
      mated date of completion, Aug. 15, 1934-----------------         24, 000. 00
   Completion of deeping of present channel through course 1,
      Bayfield Channel, under continuing contract in force; esti-
     mated date of completion, Dec. 1,1934                             26, 000. 00
   •Completion of deepening of present channel through angle
      courses 1 and 2, Bayfield and Little Rapids Channels, under
      continuing contract in force; estimated date of completion,
     Dec. 1, 1934      ----------------------------------          -- 37, 000.  00
        Total ------                 __---                             164, 000. 00
1112             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, '1934

Maintenance :
   Channel sweeping, removing shoals and other obstructions by
      United States plant----------      ------------------    $23, 000. 00
   Engineering, surveys, contingencies-----------------------10, 460.49

            Total           ---------------------------------------------                                           33, 460. 49

            Total new work and maintenance----------------------197, 460. 49
  National Industrial Recovery Act funds.--The balance unex-
pended, including accounts receivable, from funds allotted under the
National Industrial Recovery Act ($156,239.27) will be applied as
follows:
Accounts payable, June 30, 1934__ _----------------------------- $4, 600. 00
New work: Completion of deepening of present channel through
Lake Munuscong, Twin Island to Lime Island, under contract in
force; estimated date of completion, December 1934----------__ 151, 639. 27

            Total new work                    ----------------------------------                                   156, 239. 27
  Funds for ordinary maintenance are required. The sum of $75,-
000 can be profitably expended during the fiscal year ending June 30,
1936, to be applied as follows:
Maintenance:
   Channel sweeping, removing shoals and other obstructions by
      U. S. derrick boat Merganser and other United States plant----- $40, 000
     Engineering, surveys, contingencies-----------------------35, 000

            Total--------                ----------------------------------------                                       75, 000

                                          Cost and financial sunivnary
                                  MAINTENANCE AND IMPROVEMENT                           FUNDS

Cost of new work to June 30, 1934-_-___                       $34, 543, 247. 87
Cost of maintenance to June 30, 1934__------------------------     892, 071. 34
      Total cost of permanent work to June 30, 1934---------    35, 435, 319. 21
Value of plant, materials, etc., on hand June 30, 1934---------     115, 915.44

        Net total cost to June 30, 1934---------------------- 35, 551, 234. 65
.Plus. accounts receivable June 30, 1934-----------------------     2, 490. 10

      Gross total costs to June 30, 1934 - -----                                                             35, 553, 724. 75
Minus accounts payable June 30, 1934------------------------                                                      77, 145. 46

     Net total expenditures----------------------------35, 476, 579. 29
Unexpended balance June 30, 1934-------------------------- 194, 970. 39

         Total amount appropriated to June 30, 1934-----------                                               35, 671, 549. 68

   Fiscal year ending June 30                  1930             1931                 1932             1933             1934


Cost of new work __....                  $2, 205, 430. 47 $1, 171, 897. 76 $2, 082, 664. 34 $1, 489, 892. 56         $483, 298. 75
Cost of maintenance- ....---...               26, 782. 80      71, 675. 52      47, 401. 28      83, 565. 46           29, 722. 82

      Total cost        .--------------- 2, 232, 213. 27   1, 243, 573. 28   2, 130, 065. 62     1, 573, 458. 02      513, 021. 57

Total expended--------------              2,107, 890. 54   1, 411, 754. 30   1, 904, 200. 35     1, 809, 875. 38      549, 809. 46

Allotted-    _   _.._           .------------
                                   --    1, 881,000. 00    1, 772, 000. 00   -189,     662. 25   1, 609, 047. 97      480, 605. 08
                RIVERS AND HARBORS-DETROIT,                              MVICH.,       DISTRICT                1113
Balance unexpended July 1, 1933_________________________------      $264, 174. 77
Amount allotted from War Department Appropriation Act ap-
                        ----------------------- --------------
  proved July 14, 1932_______________                                501. 000.00
      Amount to be accounted for-----------------------------        7ti5, 174.77
Deductions on account of revocation of allotment____--2------20, 394. 92
      Net amount to be accounted for ______________________          744, 779. 85
Gfs akmouit expended __________________________ $593, 481. 80
Less reimbursements collected----------------------- 43, 672. 34
                                                                     549, 809. 46
      Balance unexpended June 30, 1934------------------------ 194. 970. 39
Outstanding liabilities June 30, 1934.                 $77, 358. 89
Amount covered by uncompleted contracts------------105, 193. 70
                                                                     182, 552. 59
      Balance available June 30, 1934 _ ___________----------         12,417. 80
Accounts receivable June 30, .934 ___-                                                                     2, 490. 1.0
    Unobligated balance available June 30, 1934______-__-___                                             14, 907. 90
Amount that can be profitably expended in fiscal year
                                                                                                    _
  ending June 30, 1936, for maintenance 1______________________                                          75, 000. 00

                                         PUBLIC WORKS FUNDS
Cost of new work to June 30, 1934____________________________$23, 357. 67
ost of niaintenance to June 30, 1934___________----
                                              -------------       ----------
Total cost of permanent work to June 30, 1934_________________     23, 357. 67
Minus accounts payable June 30, 1934________________--___           4,596. 94
      Net total expenditures-------------------------------- 18, 760. 73
Unexpended balance June 30, 1934___________________________ 156, 239. 27
      Total amount appropriated to June 30, 1934________________ 175, 000. 000

      Fiscal year ending June 30         1930            1931             1932              1933              1934


Cost of new work-    --------------------------------------------------------                               $23, 357. 67
Cost of maintenance.------------------------------------------------------                           --------------
        Total expended-..........    .      ___--------------------------------------------------            18,760. 73
                    ........------------------------------------------------------
Allotted------------...                                                                                      175, 000. 00

Amount allotted from National Industrial Recovery Act, approved
  June 16, 1933_--       ---        -----------------------------             175, 000. 00
Gross amount expended        -----------------------------------               18, 760. 73
      Balance unexpended June 30, 1934________________----                    156, 239. 27
Outstanding liabilities June 30, 1934________________              $4, 596.94
Amount covered by uncompleted contracts                    --     143, 957.80
                                                                              148, 554. 74
      Balance available June 30, 1934-__ ________---                 _____-     7, 684. 53
  CONSOLIDATED          COST   AND   FINANCIAL        SUM.IMARY       FOR     ST.   MARYS       RIVER,      MICH.

Cost of new work to June 30, 1934 _      ---------          $34, 566, 605. 54
Cost of maintenance to June 30, 1934 _----------------------     892, 071. 34
      Total cost of permanent work to June 30, 1934----------                                       35, 458, 676. 88
Value of plant, materials, etc., on hand June 30, 1934                                                  115, 915. 44
      Net total cost to June 30, 1934--------------------35, 574, 592. 32
Plus accounts receivable June 30, 1934 ___________-
                                             -     --------    2, 490.10
     Gross total costs to June 30, 1934_________________   35, 577, 082. 42
Minus accounts payable June 30, 1934----------------------      81, 742. 40
          Net total expenditures----------------------------                                        35, 495, 340. 02
Unexpended balance June 30, 1934    _ -----------------                                                 351, 209. 66
     Total amount appropriated to June 30, 1934---                                                  35, 846, 549. 68
  1   Exclusive of available funds.
1114           REPORT OF CHIEF OF ENGINEERS,                                             U. S. ARMY,                  1934


       Fiscal year ending June 30                     1930                   1931             1932             1933                     1934


Cost of new work -.............                $2, 205, 430. 47 $1, 171, 897. 76 $2, 082, 664. 34 $1, 489, 892. 56                $506, 656. 42
Cost of maintenance     __........                  26, 782. 80      71, 675. 52      47, 401. 28      83, 565. 46                  29, 722. 82

         Total cost.--------------              2, 232, 213. 27     1, 243, 573. 28   2, 130, 065. 62     1, 573, 458.02               536, 379. 24

Total expended---..-..........------            2, 107, 890. 54     1, 411, 754. 30   1, 904, 200. 35     1, 809, 875. 38              568, 570. 19

Allotted---------..........-.--.               - 1,881, 000. 00     1, 772, 000. 00   -189,     662. 25   1, 609, 047. 97              655, 605. 08


Balance unexpended July 1, 1933_ _       _     _      __        $264, 174. 77
Amount allotted from War Department Appropriation
Act approved July 14, 1932______    ___-____---- $501, 000.00
Amount allotted from National Industrial Recovery
                                     -------
Act approved June 16, 1933__________--            175, 000. 00
                                                                 676, 000. 00

     Amount to be accounted for________      ________________ _                                                              940, 174. 77
Deductions on account of revocation of allotment ______-__----                                                                20, 394. 92

      Net amount to be accounted for ____. _______----___                                                                    919, 779. 85
Gross amount expended__________-------           $612, 242. 53
Less reimbursements collected __________________   43, 672. 34
                                                                                                                             568, 570. 19
           Bala            in    ex         ded04
                                        anrlMrl     Tuina
                            1
                            nj   ,1:   pCU             ne         ,_______      --                                __--,-------------
                                                                                                                             'j-,        vv.   vw




Outstanding liabilities June 30, 1934--                                                              $81, 955. 33
Amount covered by uncompleted contracts                                                              249,151. 50
                                                                                                                            331, 107.33

      Balance available June 30, 1934------------------------                                                                  20, 102. 33
Accounts receivable June 30, 1934 ----------------    -------                                                                   2, 490. 10

           Unobligated balance available June 30, 1934--------------                                                           22, 592. 43

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance -_________----------------------                                                                    75, 000. 00

        2. OPERATING AND CARE OF ST. MARYS FALLS CANAL, MICH.

   The improvement for which report is made under this caption
forms part of the project for the improvement of St. Marys River
at the Falls, Mich. See pages 1106 to 1114, where general informa-
tion regarding the improvement can be found. The Weitzel Lock
has been operated and maintained under the permanent indefinite
appropriation since 1881, the Poe Lock since August 3, 1896, the..
Davis Lock since October 21, 1914, and the Fourth Lock since Sep-
tember 18, 1919.
   Operations and results during fiscal year.-During the calendar
year ending December 31, 1933, the United States canal was open
to navigation 240 days, from April 19 to December 14. During that
time a total of 8,979 vessels, aggregating 31,028,728 registered tons,
and carrying 38,033,441 short tons of freight and 9,753 passengers,
passed through the Poe, Davis, and Fourth Locks in 6,127 lockages.
The Canadian lock at Sault Ste. Marie, Ontario, open to naviga-
tion 226 days, April 20 to December 1, 1933, made 2,594 lockages and
passed 3,121 vessels, with an aggregate registered tonnage of
3,341,572, and carrying 2,274,452 short tons of freight and 11,190
passengers.
   1   Exclusive of available funds.
                      RIVERS AND                      HARBORS-DETROIT,                  MICH.,        DISTRICT               1115

   The locks, dams, and canals were operated as required, and the
necessary repairs made thereto and to the appurtenant structures.
   The total expenditures were $229,250.26; total cost $228,659.57.
   Condition at end of fiscal year.-The Weitzel Lock has been out
of commission since October 31, 1918, its operation not being neces-
sary. The Poe Lock is not in operation due to reduced lake traffic.
The Davis and Fourth Locks are in operation. The principal fea-
tures of the four locks are stated in table on page 1107. The Weitzel
and Poe Locks are served by one canal and the Davis and Fourth
Locks by a separate canal. The depth that may be carried through
the smallest lock is 12.6 feet and through the largest lock 24.5 feet
at low-water datum, but at the prevailing stages the channels leading
to the locks restrict the draft of vessels to about 18 feet. The total
expenditures for operating and care from 1881, when the Weitzel
Lock was put in service, to the end of the fiscal year amounted to
$6,725,396.87.
   Proposed operations.-The locks and canals will be operated and
maintained under allotments from the permanent indefinite appro-
priation provided by section 6 of the River and Harbor Act of
March 3, 1909.
                                                      Cost and financial summary
Cost ,of,maintenaince to June 30,,1934___-------------------$6, 707, 999. 91
Value of plant, materials, etc., on hand June 30, 1934_________  27, 539. 86

      Net total cost to June 30, 1934___                                                                            735, 539. 77
                                                                                                                  6________________---,
Plus accounts receivable June 30, 1934__ ____________------692.                                                               29

      Gross total costs to June 30, 1934---_-                                                                     6,736, 232. 06
Minus accounts payable June 30, 1934-------------------------                                                        10, 835. 19

     Net total expenditures_______________________                                                                6, 725, 396. 87
Unexpended balance June 30, 1934--------------------------                                                            23, 570.41

             Total amount appropriated to June 30, 1934 __________                                                6, 748, 967. 28

     Fiscal year ending June 30                          1930            1931            1932            1933              1934

Cost of new work...................................................
Cost of maintenance--------         -          $248, 794. 65          $249, 045. 74   $270,488.04     $224, 861. 74      $228, 659. 57
Total expended..........---------------                255, 399. 76    254, 719. 83    369, 292. 39    217, 192. 84       229, 250. 26
Allotted......................---------------------    270, 000. 00   36, 000. 00      295000. 00      21,587. 96         208;999. 07


Balance unexpended July 1, 1933________--------- __--------      $43, 821. 60
Amount allotted from permanent indefinite appropriation, sec. 6,
    River and Harbor Act, Mar. 3, 1909------__-____----                                                               237, 000.00
Amount to be accounted for _._______- --            -__                                                          __   280,821. 60
Deductions on account of revocation of allotment__------                                                     -         28, 000. 93

Net amount to be accounted for--- -------        ----------      -   252, 820. 67
Gross amount expended __-__-           -      -___ ___--$234, 181.82
Less:
    Reimbursements collected------------$4, 798. 71
    Receipts from sales-    -__           -
                                     -_____--    132. 85
                                                                                                      4, 931.56
                                                                                                                      229, 250.26
             Balance unexpended June 30, 1934-..............--                                                         23, 570.41
1116     REPORT OF       CHIEF OF ENGINEERS,           U. S. ARMY,         1934

Outstanding liabilities June 30, 1934___________-______---__                 $10, 854. 53

     Balance available June 30, 1934_____-_                                   12, 715. 88
Accounts receivable June 30, 1934_.....__________--__-_-
                                                 -                                692. 29

     Unobligated balance available June 30, 1934___-.__. __                   13,408. 17
Amount allotted for fiscal year 1935___------- ---------------               288, 000. 00

       Balance available for' fiscal year 1935 -------------                 301, 408. 17

  3. CHANNEL BETWEEN MACKINAC ISLAND AND ROUND ISLAND,
                                        MICH.

   Location.-This waterway is located between Mackinac Island and
Round Island, in the Straits of Mackinac. (See U. S. Lake Survey
Chart No. 6.)
   Existing project.-No project has been adopted by Congress. The
provision of a channel between Mackinac Island and Round Island,
Mich., 1,250 feet wide, 27 feet deep, below low-water datum, elevation
578.5 feet, and 3,250 feet long, as recommended by the Chief of En-
gineers in Rivers and Harbors Committee Document No. 2, Seventy-
second Congress, first session, has been included in the Public Works
program under the National. Industrial Recovery Act. The above-
mentioned document contains a map of the waterway.
   Recommended modifications of project.-Included in Public Works
program.
   Terminal facilities.-None.
   Operationsand results during fiscal year-New work.-With funds
allotted from the National Industrial Recovery Act, United States
force and plant completed a sounding and probing survey of the
channel between Mackinac and Round Islands, Mich. Specifications
for deepening this channel to 27 feet below elevation 578.5 were
prepared and bids received, the contract being awarded December
20, 1933. No work was done by the contractor except construction
of camp buildings. Total costs for fiscal year, $6,046.17; total ex-
penditures, $6,046.17.
   Condition at end of fiscal year.-No excavation work has been
done. Within the limits of the proposed channel, there is a natural
minimum depth of 18.9 feet, as shown by survey made in 1933.
   The costs and expenditures were $6,046.17.
   Proposed operations.-The balance unexpended from funds al-
lotted under the National Industrial Recovery Act, total $427,953.83,
will be applied to completion of deepening and widening of channel
between Mackinac and Round Islands, Mich., by contract in force;
estimated date of completion, July 1935.
   No additional funds are expected to be necessary for maintenance
during the fiscal year ending June 30, 1936.
                            Cost and financial summary

Cost of new work to June 30, 1934___--_________________-__                    $6, 046. 17
Cost of maintenance to June 30, 1934 -.... ___

       Total cost of permanent work to June 30, 1934_-----___                     6,046. 17
Net total expenditures---------    -             -     -       -   -           6,046. 17
Unexpended balance June 30, 1934------                                       427, 953. 83
       Total amount appropriated to June 30, 1934 ..-------            _     434,000.00
                RIVERS AND HARBORS-DETROIT,                               MICH., DISTRICT                                 1117

    Fiscal year ending June 30           1930           1931                 1932                  1933                 1934


Cost of new work--......     ---------------------------------------------------------                                  $6, 046.17
Cost of maintenance..-------------------------------                                                                        ---
                                                                      -------------------------------......................................................
      Total expended.........                      -----------------------------------
                                     ....-----------------                                                ---            6,04. 17
Allotted..------------------------------ ---------................           ........----
                                                             -----------------------                                  434,000.00

Amount allotted from National Industrial Recovery Act approved
   June 16, 1933--_                                                                                       -$434,     000. 00
                                                                                                            $-------------------

Amount to be accounted for--                                                                                     434, 000. 00
Gross amount expended----------------------------------------                                                      6, 046. 17
     Balance unexpended June 30, 1934    - ---.......--                                                          427, 953. 83
Amount covered by uncompleted contracts-----                                                                     427, 953. 83
                                   4. ST. CLAIR RIVER, MICH.
  Location.-This river connects Lakes Huron and St. Clair.                                                                  (See
U. S. Lake Survey Chart No. 43.)
  Existing project.-This provides for channels as follows:

                                                   Distance
                                                      romstance Used by or
                                                              upbound                Project          Project          Project
           Name of channel            channelof
                                     Length         mouth     downbound              width             depth            planes
                                                                   vessels                                              panes

                                        Feet        Miles                              Feet               Feet
Foot of Lake Huron ..-------------       25, 000        42       Both-     ....              800                26   578. 5-578. 3
Port Huron Middle Ground .-               8, 000        37. 5    Down ...-- 1,000-1, 400                        25   577. 7-577. 3
Shoals Port Huron to Marys-              15, 000        34. 0    Both _....               1, 000                25   577. 3-576. 9
  ville.
Shoals Marysville to Stag Island          8, 000        32. 0 ___do .....                 1, 000                25   576. 8-576. 6
Stag Island-East Channel....             15, 000        31. 0 Up__ _.-.                      800                20   576. 9-576. 5
Shoals Stag Island to St. Clair__        28, 000        27     Both .... _                1, 000                25   576. 5-575. 9
St. Clair Middle Ground- .....            4, 500        25      _-_do ..                     900                25          575. 8
Marine City Shoal______ . ___.            5,800         19      ___do .-...               1, 000                25   575. 2-575. 1
Shoals Michigan Salt Works to            18, 000        15      ---. do
                                                                      ...                 1, 000                25   575. 0-574.8
  Roberts Landing.
Head of Russell Island Shoal              5, 500        12. 5 ___do                     1, 000                  25   574. 6-574. 5
Grand Pointe and Squirrel Is-            15, 000         7. 0 -- do- ...            1,000-600                   25   574. 4-574. 2
  land Shoals.
Southeast Bend from Harsens              18, 000         3.5 ___do        .--                600                25   574.1-573.8
  Island Rear Light No. 9 to
  Lower Reach Lower Light
  No. 1.
Shoals from Lower Reach Lower            10, 000         1.0 ___do .....               600-700                  25   573. 7-573. 6
  Light No. 1 to St. Clair Flats
   Canal.

  Improvement at all localities consists of deepening or widening of
the natural channels by dredging.
  The project also provides for compensating works, consisting of a
number (estimated at 31) of submerged rock sills, with crests 31 feet
below datum.
  The project depths are referred to low-water datums for Lakes
Huron and St. Clair, which are taken at 578.5 and 573.5 feet above
mean tide level at New York. The water level of this river fluctuates
with the levels of the Lakes above and below it, which during the
course of each year are subject to a consistent seasonal rise and fall,
the lowest stages prevailing during the winter months and the
highest during the summer months.
  At .the head of St. Clair River, as measured by monthly mean
levels, the water may rise and fall each year during the navigation
season as much as 1.3 feet. During the past 23 navigation seasons the
difference between the highest and lowest monthly mean levels has
been about 4.9 feet. Occasional fluctuations due to winds of high
velocity may be as much as 3.5 feet in 6 hours.
1118   REPORT OF CHIEF OF ENGINEERS,       U.   S.   ARMY,   1934

   The estimate of cost for new work, revised in 1930, is $3,140,500
for dredging and $2,900,000 for construction of submerged sills.
   The latest (1930) approved estimate for annual cost of mainte-
nance of dredged channels is $33,500. No expense of maintenance
will probably be required for submerged sills.
   The existing project was authorized by the following river and
harbor acts: The act of July 13, 1892, provided for the 20-foot chan-
nel in the river (H. Doc. No. 207, 51st Cong., 2d sess.) ; the act of
July 27, 1916, provided for a channel along the Port Huron water
front (H. Doc. No. 782 64th Cong., 1st sess.); and the act of July 3,
1930, provided for the deepening of the channel to 25 and 26 feet
and for compensating works (H. Doc. No. 253, 70th Cong., 1st sess.).
The latest published map is in the document last mentioned.
   Terminal facilities.-This improvement serves the through com-
merce between the upper and lower lakes, and it has not materially
influenced the terminal facilities at the towns along its route, which
consist only of small docks for the accommodation of local traffic.
   Operations and results during ftscal year-Regular funds-New
work.-Surveys were made and studies were continued with the view
to the placing of submerged weirs at the head of the river to provide
compensation for channel deepening.
   Foot of Lake Huron.-Dredging under continuing contract was
resumed on June 14, 1933, and discontinued on November 2, 1933.
A total of 1,132,240 cubic yards, place measure, has been removed
from this shoal, of which 198,052 cubic yards were removed prior
to July 1, 1933, under this contract.
   Roberts Landing Shoal.-Dredging in this vicinity of the river
was done by U. S. seagoing hopper dredges Burton, Taylor, and
Meade, and hired labor, during periods between October 11 and
November 30, 1933, and removed a total of 963,383 cubic yards, bin
measure, during that time.
   South Channel.-Dredgingin the South Channel between Russell
Island and St. Clair Flats Canal was done by United States sea-
going hopper dredges and hired labor. Dredge Burton, between
July 5 and October 27, 1933, removed 1,071,214 cubic yards, bin
measure, from a number of shoal areas within the river, and the
dredge Taylor, between July 11 and October 10, 1933, removed
1,148,818 cubic yards, bin measure.
  Public Works funds-New work-Shoals, St. Clair to Marys-
ville. Contract dredging in this section was started on May 26, 1934,
and was stopped on June 6, 1934, due to labor difficulties. A total of
17,633 cubic yards, place measure, were removed during that period.
  Shoal at Marine City.-Contract was started on April 19, 1934,
and finished on May 16, 1934.
  Head of Russell Island Shoal.-Contract dredging in this locality
was started on October 21, 1933, discontinued for the season on
December 23, 1933, resumed on April 5, 1934, and discontinued on
May 19, 1934. A total of 214,533 cubic yards, place measure, has been
removed. Due to labor difficulties no work was in progress at the
end of the fiscal year.
   Channel above St. Clair Flats Canal.-The approach to the St.
Clair Flats Canal at the upper end is considered as being part of the
St. Clair River. Dredging in this area is included in the contract
            RIVERS AND HARBORS---ETROIT,                          MICI., DISTRICT            1119
for the removal of the west dike and deepening the east and west
channels.
  The costs during the fiscal year were distributed as follows:
                                           REGULAR FUNDS
New work:
   Dredging under contract------   ---------------------- $179, 823..70
   Dredging by Government plant-----------------  -__      178, 089. 77

      Total--------------------------------------------                                357, 913. 47

                                      PUBLIC WORKS FUNDS
New work:
   Dredging under contract------                          -----------------------      165, 072. 80

      Total, all funds------------------------------------522,                              986. 27
   The total expenditures were $508,692.03, of which $358,736.82 were
from regular funds and $149,955.21 from Public Works funds.
   Condition at end of fiscal ear.-The project as a whole is about
20 percent completed.
   Foot of Lake Huron.-Dredgingunder present contract has pro-
vided a channel depth of 24.9 feet at present low-water datum
through the shoal except for a stretch of about 9,500 feet along the
easterly side near the lower end where the completed width is only
300 feet. The contract is about 64 percent completed. The minimum
available depth over the unfinished area is about 21 feet at present
low-water datum.
   Roberts Landing Shoal.-The work done at this locality by United
States hopper dredges has resulted in removing the lower portion
of this shoal to about 25-foot depth. The work is about 30 percent
completed.
   South Channel.-Dredgingin this channel by Government hopper
dredges has resulted in providing practically full project depth and
width. Surveys made after dredging indicate that only a nominal
amount of clean-up work will be required. The work is about 99
percent completed.
   Shoals, St. Clair to Marysville.-Dredging under this contract was
started at the upstream end. The removal of 17,633 cubic yards, has
provided no noticeable effect on present project dimensions. The
contract is about 1 percent complete.
   Shoal at Marine City.-The dredging of this: shoal has been com-
pleted. A channel having a least depth of 25 feet and a minimum
width of 1,000 feet is now in existence at this locality.
   Head of Russell Island.-Dredging under this contract has
resulted in providing a channel width of about 800 feet for full
project depth. The work still to be done is located along the westerly
edge of the shoal where prevailing depths vary from 16 to 20 feet.
The contract is about 67 percent completed.
   The costs have been as follows:
                                           REGULAR        FUNDS

New work     -------------------------------------                                  $1, 243, 396. 20
Maintenance------- -------------------------------------                                439, 258. 59

      Total               ------------------------------------------                1, 682, 654.79
     91536---ENG 1934            71
1120       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                    1934

                                        PUBLIC WORKS FUNDS
New work-------------------------------------------------                                     $165, 072. 80

         Total,   all funds -------------------------                                        1, 847, 727. 59
  The total expenditures were $1,811,975.72, of which $1,662,020.51
were from regular funds and $149,955.21 from Public Works funds.
  Proposed operations.-The balance unexpended, including ac-
counts receivable, at the end of the year ($187,658.75) will be applied
as follows:
Regular funds: Accounts payable June 30, 1934------------------ $20, 800. 09
New work:
   Completion of deepening present channel through foot of Lake
      Huron, under continuing contract; estimated date of comple-
      tion October 1934---------------------------------------    123, 500. 00
   Deepening present channel at Roberts Landing by United
      States hopper dredges, August to October 1934_ .. _____-__.  41, 200. 00

         Total                                               185, 500. 00
                     ------------------------------------------
Maintenance: Engineering, surveys, contingencies-----------     2, 158. 75

         Total new work and maintenance------------------------187, 658.75
  National Industrial Recovery Act funds.-The balance unex-
pended from funds allotted under the National Industrial Recovery
Act ($972,044.79) will be applied as follows:
Accounts payable June 30, 1934______      --------
                                        __--------                _ $23, 572. 53
New work :
    Completion of deepening present approach channel to St. Clair
     Flats Canal by contract in force (included in contract for re-
      moval of west dike of canal) ; estimated date of completion
      Sept. 1, 1934----------------------------------------- 49, 000.00
    Completion of deepening channel at head of Russell Island;
      estimated date of completion Sept. 1, 1934_______________--42, 000. 00
    Completion of deepening present channel from St. Clair to
      Marysville by contract in force; estimated date of comple-
     tion Dec. 1, 1935----------                                    8----------------------
                                                                    811, 500. 00
    Deepening present channel at Roberts Landing by United
      States hopper dredges, 2 months, September-October 1934__ 45, 972.26

             Total--------------___---------------------------                                 972, 044. 79
  The additional allotment of $1,000,000, made during July 1934
will be applied as follows:
Deepening of channel from Marysville to Port Huron by contract;
estimated date of completion Dec. 1, 1935__________________---                                   $800, 000
Construction of 2 compensating works in the St. Clair River by con-
tract; estimated date of completion Dec. 1, 1935---_----__----  --                                200, 000

          Total---------------------------------------------                             _       1, 000, 000
  The construction of the compensating works, contained                                            in the
project, should be provided for in part. Funds for ordinary main-
tenance are also required. The funds that can be profitably ex-
pended during the fiscal year ending June 30, 1936 ($320,000), will
be expended about as follows:
New work : Construction of compensating weirs at head of St. Clair
  River by contract to be entered into the summer of 1935 (40 per-
  cent    completion) -         -   ----------          -------    --   ---.                      $300, 000
Maintenance:
   Dredging by United States hopper dredge                                                           15, 000
    Surveys, examinations, contingencies-                         --                                  5, 000
           Total --         -          ----             ------          --     -   --   --         320, 000
                  RIVERS AND HARBORS-DETROIT,                                     MICH.,          DISTRICT                1121
                                          Cost and financial summary
                                 MAINTENANCE              AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934------------------------1 $1, 243, 396. 20
Cost of maintenance to June 30, 1934___                        439, 258. 59
      Total cost of permanent work to June 30, 1934----------                                                  1,682, 654. 79
Plus accounts receivable June 30, 1934 ------------------------                                                       187. 60
      Gross total costs to June 30, 1934--------------------- 1,682, 842. 39
Minus accounts payable June 30, 1934-----------------------      20, 821. 88
     Net total expenditures -----------------------------                                                      1, 662, 020. 51
Unexpended balance June 30, 1934----------------------                                                            187, 471. 15
           Total amount appropriated to June 30, 1934                                                             849, 491. 66-
                                                                                                               1------------,

           Fiscal year ending June 30                       1930           1931            1932            1933           1934


Cost of new work ......
                  _____ _____________  _ ... _____                                                     $56, 083.85     $357, 913. 47
Cost of maintenance ------------------    $12, 136. 05                  $19, 553. 32      $412. 27    ____________


Total expended________           ________________         12, 136. 53    15, 628. 21     6, 803. 87     28, 349. 74     358, 736. 82
Allotted................----------------------------18,      700. 00     11, 000. 00   -8, 001. 00     228,437. 20      345, 121. 62


Balance unexpended July 1, 1933___              __---                                                             $201, 086. 35
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934------------------- $10, 000.00
Amount allotted from War Department Appropriation
  Act approved July 14, 1932_.--                    270, 000.00
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933---------------------70, 000. 00
                                                                                                                   350, 000. 00
      Amount to be accounted for_---------------------------_                                                      551, 086. 35
Deductions on account of revocation of allotment-----------                                                          4, 878. 38

       Net amount to be accounted for-----------------------                                                       546, 207. 97
Gross amount expended_------------------------_  $371, 224. 21
Less reimbursements collected__-----------------   12, 487. 39
                                                                                                                   358, 736. 82

      Balance unexpended June 30, 1934----------------------                                                       187, 471. 15
Outstanding liabilities June 30, 1934_------------- $20, 821. 88
Amount covered by uncompleted contracts ----     -  123, 461.27
                                                                                                                   144, 283. 15

     Balance available June 30, 1934-------------------------                                                         43, 188. 00
Acounts receivable June 30, 1934__------------------------------                                                          187. 60

          Unobligated balance available June 30, 1934 --------------                                                  43, 375. 60

Amount (estimated) required to be appropriated for                       completion
                       - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
of existing project 2                                                                     3, 350, 000. 00

Amount that can be profitably expended in fiscal year ending June
30, 1936:         -   - -- - -- - -- - -- - -- -- - -- - - -- -- - -- - -- - - -- -
    For new work 2                                                                                                 300, 000. 00
    For maintenance -----------------------------                                                                     20, 000. 00
                      -- - -- -- - -- -- -- - --          - - - - -               - -- - - - - - - - - - - -
           Total 2                                                                                                 320, 000.00
  1Reduced by $3,741.20, account of Court of Claims settlement.
  SExclusive of available funds.
1122          REPORT OF                CHIEF OF ENGINEERS,                            U.   S.     ARMY,           1934

                                                   PUBLIC WORKS               FUNDS

Cost of new work to June 30, 1934 ____________________________                                                      $165, 072. 80
Cost of maintenance to June 30, 1934   ______

      Total cost of permanent work to June 30, 1934------------165, 072. 80
Value of plant, materials, etc., on hand June 30, 1934_________    8, 454. 94

     Net total cost to June 30, 1934 ______ __ __ __     ______                                                       173, 527. 74
Minus accounts payable June 30, 1934 -------------------------                                                         23, 572. 53

     Net total expenditures ______ ________-------                                                                    149, 955. 21
Unexpended balance ,June 30, 1934---------------------------                                                          972, 044. 79
            Total amount appropriated to June 30, 1934 ____________                                                1,122, 000. 00

    Fiscal year ending June 30                    1930                1931             1932                1933             1934


Cost of new work ---------------------.----------.-------
                                               .
                                         ----------.-                                                                     $165, 072. 80
Cost of maintenance------                                                                       ------------------ ---..................................
       Total expended -----------------------------------------------------                                                149, 955. 21

Allotted.    ___.------------            __,_
                                     -------------                         _ ------------ -------------
                                                                   -------------                                         1,122, 000.00


Amount allotted from National Industrial Recovery Act approved
  June 16, 1933---------------------------------------1,                                                             700, 000. 00
Deductions on account of revocation of allotment---------------                                                      578, 000. 00

      Net amount to be accounted for     ___--------------      - 1,122,000. 00
Gross amount expewided- -------------              $151,991.71
Less:
    Reimbursements collected -------   $2, 021. 50
    Receipts from sales---------------      15. 00
                                                        2, 036. 50
                                                                    149, 955. 21

      Balance unexpended June 30, 1934___-------------       -                                                       972, 044. 79
Outstanding liabilities June 30, 1934______________ $23, 572. 53
Amount covered by uncompleted contracts--------- 902, 773. 21
                                                                                                                      926, 345. 74

      Balance available June 30, 1934_____  __..   _______-       45, 699. 05
*Amount allotted by Public Works Administration Emergency Ap-
  priation Act, fiscal year 1935 ____________-_________       1, 000, 000. 00

          Balance available for fiscal year 1935__----.-____                                                      1, 045, 699. 05
       CONSOLIDATED COST AND FINANCIAL SUMMARY FOR ST. CLAIR RIVER, MIC'H.

Cost of new work to June 30, 1934------------------------                                                         $1, 408, 469. 00
Cost of maintenance to June 30, 1934    ------                                                                        439, 258. 59
      Total cost of permanent work to June 30, 1934----------                                                      1, 847, 727. 59
Value of plant, materials, etc., on hand June 30, 1934----------                                                        8, 454. 94

      Net total cost to June 30, 1934    ______                                            ___ -      -            1, 856, 182. 53
Plus accounts receivable June 30, 1934__---.....                                              ____---                      187. 60

      Gross total costs to June 30, 1934 ___-_____-__ ____                                                         1, 856, 370. 13
Minus accounts payable June 30, 1934_.. ______--------__                                                               44, 394. 41
          Net total expenditures                                                                                   1, 811, 975. 72
Unexpended balance June 30, 1934-...............                                                                   1, 159, 515. 94
          Total amount appropriated to June 30, 1934-.....                                                         2, 971, 491. 66
                  RIVERS         AND HARBORS--DETROIT,                                          MICH.,             DISTRICT                     1123

          Fiscal year ending June 30                           1930                    1931                 1932              1933              1934

Cost   of new   work___--______-_____-_                            _      ..-...--            ___   _.-.           -$56,       083. 85     $522, 986. 27
Cost of maintenance __ __-          ______     ____        $12, 136. 05         $19, 553. 32                $412. 27   ............        .........
Total expended___--------------____----12, 136. 53                                   15, 628. 21           6,803. 87       28, 349. 74      508, 692. 03
Allotted -......        ___......___
                          ___        __ ....   __     __    18, 700. 00              11, 000. 00      -8,001. 00           228, 437. 20 1, 467, 121. 62


Balance unexpended July 1, 1933--------------------------$201,         086. 35
Amount allotted from War Department Appropria-
  tion Act approved Apr. 26, 1934________________ $10, 000. 00
Amount allotted from War Department Appropria-
  tion Act approved July 14, 1932______________   270, 000. 00
Amount allotted from War Department Appropria-
  tion Act approved Mar. 4, 1933_______________    70, 000. 00
Amount allotted from National Industrial Re-
  covery Act approved June 16, 1933____________1, 700, 000. 00
                                                               2, 050, 000. 00
     Amount to be accounted for___________________________     2, 251, 086. 35
Deductions on account of revocation of allotment---------------582, 878. 38

      Net amount to be accounted for __     ________ ___-__-1, 668, 207. 97
Gross amount expended_______________________       $523, 215. 92
Less:
    Reimbursements collected -----    $14, 508. 89
    Receipts from sales                     15. 00
                                                     14, 523. 89
                                                                 508. 692. 03

      Balance unexpended June 30, 1934__           ___________________                                                                1,159, 515. 94-
Outstanding liabilities June 30, 1934__--_________      $44, 394. 41
Amount covered by uncompleted contracts------- 1,026, 234. 48
                                                                                                                                      1, 070, 628. 89
          Balance available June 30, 1934________________________                                                                        88, 887.05
Accounts receivable June 30, 1934                          -_--                            ----------                                         187. 60

     Unobligated balance available June 30, 1934_____________                                                                            89, 074. 65
Amount allotted by Public Works Administration, Emergency
App)ropriation Act, fiscal year 1935_________________________                                                                        1, 000, 000. 00
          Balance available for fiscal year 1935__________________                                                                    1, 089, 074. 65
Amount (estimated) required to be appropriated for completion
of existing project 1--                                                                                                              3, 350, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1936:
   For new work 1                                                                                                                       300, 000. 00
   For maintenance -------                                                                                                               20, 000. 00
            Total 1                                                    ------------                                                     320, 000. 00

                           5. CHANNELS IN LAKE ST. CLAIR, MICH.

  Location.-Lake St. Clair is the smallest of the Great Lakes. (See
U. S. Lake Survey Chart No. 42.)
  Previous projects.-Acts of 1852, 1853, 1867, and 1873. The total
amount expended on, and the total cost of the original and modified
projects (including the middle channel), prior to the commence-
ment of operations under the existing project in 1886, was $656,060.
   1Exclusive        of available funds.
1124       REPORT   OF   CHIEF   OF ENGINEERS,   U.   S.   ARMY,   19 3 4

For further details see page 2882, Annual Report for 1896, and
pages 1957-1958, Annual Report for 1915.
   Existing project.-This provides for ship canals consisting of two
dredged cuts at the mouth of the south channel of St. Clair River,
each 300 feet wide and 25 feet deep, these cuts to be separated for
a distance of about 7,221 feet by a sand dike 100 feet wide, revetted
on each side by sheet piling, the east side of the east cut to be pro-
tected by a dike of the same length but only 50 feet in width. From
the south end of the dike the channel is to be 25 feet deep and 700
feet wide, increasing to 800 feet and maintaining that depth across
Lake St. Clair to head of Detroit River.
   The project depth is referred to low-wvater datum for Lake St.
Clair, which is taken at 573.5 feet above mean tide at New York. As
measured by monthly mean levels, the water may rise and fall dur-
ing the navigation season each year as much as 1.4 feet. During the
past 23 navigation seasons the difference between the highest and
lowest monthly mean level has been about 4.1 feet. Occasional fluc-
tuations due to winds of high velocity may be as much as 1 foot in 6
hours.
   The estimate of cost for new work, revised in 1930, is $4,552,500,
exclusive of amounts expended on previous projects. The latest
 (1930) approved estimate for annual cost of maintenance is $20,000.
   The existing project was authorized by the following river and
harbor acts: The act of August 5, 1886, provided for the present
dikes (Annual Report for 1885, p. 2159); the act of July 13, 1892,
provided for the deepening of the east cut of the canal and for
dredging the channel at Grosse Pointe (H. Doc. No. 207, 51st Cong.,
2d sess.); the act of June 13, 1902, provided for the second cut at
the canal for downbound vessels (H. Doc. No. 234, 56th Cong., 2d
sess.) ; the act of March 2, 1919, provided for a 21-foot depth in the
Grosse Pointe Channel for a length of about 51/4 miles (H. Doc. No.
188, 65th Cong., 1st sess.) ; and the act of July 3, 1930, provided for
a 25-foot depth through the canals and the channel through Lake
St. Clair (H. Doc. No. 253, 70th Cong., 1st sess.). The latest pub-
lished maps are in the last-mentioned document and Rivers and
Harbors Committee Document No. 3, Seventy-second Congress, first
session.
  Supplementing the work authorized by Congress, the removal of
the center dike in the St. Clair Flats Canal and deepening the
channel to 25 feet, as recommended by the Chief of Engineers in
Rivers and Harbors Committee Document No. 3, Seventy-second
Congress, first session, has been included in the public-works pro-
gram under the National Industrial Recovery Act.
  Recommended m,odifications of project.-Included in public-works
program.
  Terminal facilities.-None.
   Operations and results during fiscal year-Regular funds.-New
work: Contract dredging was continued at upper end of Lake St.
Clair until completion on September 28, 1933. The total amount
of pay material removed was 1,701,428 cubic yards, place measure, of
which 1,602,258 cubic yards were removed during the fiscal year.
   The easterly half of the channel in lower end of Lake St. Clair
was dredged under contract. The work was started on June 23, 1933,
          RIVERS AND HARBORS-DETROIT,            MICH.,   DISTRICT        1125
and completed on April 12, 1934. Final payment on this contract
had not been made at the end of the fiscal year.
  Public Works funds.-New work. The .removal of the west dike
at St. Clair Flats Canal to 25 foot depth and the dredging of the
channels on either side to same depth was started under contract on
October 7, 1933, halted on December 17, 1933, for the winter, and re-
sumed on April 16, 1934. At the end of the fiscal year there had
been removed 897,646 cubic yards, place measure.
  Dredging under contract in the westerly half of the channel in
lower end of Lake St. Clair was started on April 17 and ceased on
June 1, 1934, on account of labor difficulties. During the time
worked, there were removed 706,574 cubic yards, place measure.
  The costs during the fiscal year were distributed as follows:
                              REGULAR   FUNDS

New work: Dredging under contracts, including surveys---------- $400, 629. 74
Maintenance: Custody of canal-----------------        _ _-----_    1,718. 71
      Total--------------------------------------------------    402, 348.45
                            PUBLIC WORKS FTNDS
New work: Dredging under contracts, including surveys----------      535, 511. 74
     Total all funds  __________         ____________                937, 860. 19
   The total expenditures were $839,573.43, of which $394,262.74 were
from regular funds and $445,310.69 from Public Works funds.
   Condition at end of fiscal year.-The existing project, as modified
by authorization under the Public Works Administration, is about
60 percent completed. The easterly dike for the protection of the
St. Clair Flats Canal was completed in 1892 and is in fair condition.
The authorization under Public Works funds provides for the re-
moval of the center dike and the deepening of a channel for 700-
foot width in place of the two 300-foot channels which have hereto-
fore separated up- and down-bound traffic through this stretch. The
east 300-foot width of -this channel has been deepened, and the re-
moval of the center dike and the deepening of the west 300-foot
width of channel are in progress. This contract is about 63 percent
completed.
   Channel at upper end of Lake St. Clair.-Contractdredging at
upper end of Lake St. Clair to the 25-foot project depth extended
lakeward from the canal for a length of 15,400 feet and a tapering
width from 700 feet to 800 feet. Dredging operations have resulted
in providing full depth and width in the contract area.
   Lakeward from this contract area there is in existence a stretch
of channel about 3 miles in length where no work under the present
project has been done. The prevailing depth in the channels in
Lake St. Clair is governed by this area, and a small area in westerly
half of the channel in lower end of Lake St. Clair. The existing
depth is about 21 feet for a center width of about 400 feet, decreas-
in,g to an available depth of from 18 to 20 feet toward the sides of
the channel.
   Lower end of Lake St. Clair East half.-Dredging in this area
has provided a channel 400 feet wide, 25 feet deep for a length of
about 5 miles along the easterly side. The contract is completed.
   Lower end of Lake St. Clair-West half .- Dredging in the west-
erly half of the channel provided full depth of 25 feet and width of
1.126     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                         1934

400 feet, west of the center line, for a length of about 2 miles. The
contract is about 35 percent completed.
   The costs have been as follows:
Regular -funds:
    New work -----------            ---------------------------             $2, 406,   181. 00
    Maintenance---------------------------------------                          850,   568. 07
      Total---------        ---------------------------------                3, 256,   749. 07
Public Works funds: New work ____---------                 --------------       535,   511. 74
      Total all funds ----------------------------------                     3, 792,   260. 81
   The total expenditures were $3,683,787.36, of which $3,238,476.67
were from regular funds and $445,310.69 from Public Works funds.
   Proposed(operations.--Thebalance unexpended, including accounts
receivable at the end of the year ($29,185.07), will be applied as
follows :
Regular funds:
   Accounts payable, June 30, 1934____
New work:
                                                  ____________________      $19, 614. 67

   Engineering and surveys, and overhead in completion of con-
      tract for dredging easterly half of channel, lower end Lake
      St. Clair__---------------------------------------------                     8, 500
        Total      -------------------------------------------                28, 114. 67
Maintenance:
   Engineering, surveys, contingencies--                      -------------
                                                                         _     1, 070. 40
      Total     ---------------------------------------------                 29, 185. 07
  National Industrial Recovery Act funds.-The balance unex-
pended, including accounts receivable, from funds allotted under
the National Industrial Recovery Act, total $603,989.31, will be
applied as follows:
New work:
   Completion of dredging of westerly half of lower end of pres-
     ent channel by contract in force; estimated date of comple-
     tion, Sept. 1, 1935---------------------------------$373, 000. 00
   Completion of work by contract of dike removal, dredging, etc.,
     at St. Clair Flats Canal; estimated date of completion,
     Sept. 1, 1934      -------------------------------            130, 989. 31
        Total        --------------------------------------        603, 989. 31
   The dredging of the channel near midlake to a depth of 25
feet, should be undertaken to complete the project in Lake St. Clair.
This work can be done most economically by United States hopper
dredges and funds for their operation should be made available.
The channel below St. Clair Flats Canal is subject to continuous
shoaling and maintenance dredging is therefore necessary. The
funds that can be profitably expended during the fiscal year ending
June 30, 1936 ($130,000), will be applied as follows:
New work:
   Deepening present channel in midlake by United States
      hopper dredges, including surveys and examinations (100
      percent completion) --    __                               $120, 000. 00
                                         -__-___-___________------_
Maintenance:
   Dredging by United States hopper dredge--------------            5, 000. 00
   Examination of channels and contingencies                         , 000. 00
                                                                    5----------------
        Total_____   _____   _              ___    __-                           10, 000.00

        Total new work and maintenance_                         --             130, 000.00
                 RIVERS AND HARBORS-DETROIT,                                    MICH., DISTRICT                     1127
                                         Cost and financial summary
                                 MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934___________________          ___ $3, 062, 241. 00
Cost of maintenance to June 30, 1934---__----____   --------.         850, 568. 07
      Total cost of permanent work to June 30, 1934-----------3, 912, 809. 07
Value of plant, materials, etc., on hand June 30, 1934             1, 232. 47

      Net total cost to June 30, 1934 ----------------      ____ -3,                                          914, 041. 54
Plus accounts receivable June 30, 1934 -------------------------                                                   109. 80
     Gross total costs to June 30, 1934-----------------------                                          3, 914, 151. 34
Minus accounts payable June 30, 1934                          __                                             9,614. 67
                                                                                                            1__________________

      Net total expenditures____       -____________--______
                                                           3,894, 536. 67
Unexpended balance June 30, 1934 _________________________    29, 075. 27
            Total amount appropriated to June 30, 1934______-______                                     3,923, 611. 94

    Fiscal year ending June 30                1930               1931            1.932           1933             1934
-     _.                                               ...--..

                    ---..
Cost of new work..-__..                 __-----------      _.--      --      -$130, 856.97     $95, 271. 26     $400, 629. 74
Cost of maintenance..........------------     $29, 904. 68      $122, 649.97     16, 329. 12     1, 988. 64        1, 718. 71
       Total cost----------------            29, 904. 68     122, 649. 97      147, 186. 09     97, 259. 90      402, 348. 45
Total expended-       .---------------       27, 873. 68     111, 781. 96      155, 258.37      90, 073. 12      394, 262. 74
Allotted_           .---------------------
                                      112, 000. 00.          216, 000. 00                 .... 712, 331.58
                                                                             ..-------------..                  -203, 730. 05


Balance unexpended July 1, 1933--------------------------      $627, 068. 06
Deductions on account of revocation of allotment-------------- 203, 730. 05

      Net amount to be accounted for_---
                                     ....... ----     __    __-                                               423, 338. 01
Gross ,amount expended __-___---_______-__        $402, 9,51.74
Less reimbursements collected -____ __-8,               689. 00
                                                                                                              394, 262. 74

      Balance unexpended June 30, 1934- -    .__              ___
                                                          -_______                                             29, 075.27
Outstanding liabilities June 30, 1934_ __-__-    -___ $19, 614. 67
Amount covered by uncompleted contracts-----------      6, 354. 31
                                                                                                               25, 968. 98

     Balance available June 30, 1934---------------------------       3,106. 20
Accounts receivable June 30, 1934-------- __    __---         -____-___ 109. 80
            Unobligated balance available June 30, 1934__                                _______                3,216. 09
Amount (estimated)- - required   to be appropriated for completion of
                       -  - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - --
existing project                                                                     280, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1936:            -- -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- -
   For new work                                                                                120, 000. 00
                            - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
   For maintenance                                                                              10, 000. 00
                           --- - - - -- -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - --
            Total                                                                                             130, 000. 00

    1 Exclusive of available funds.
1128           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                                     19:34

                                                     PUTBLI          WORKS FUNDS

Cost of new work to June 30, 1934                                                                                                $-------------------
                                                                                                                                 $535, 511.74
Cost of maintenance to June 30, 1934__--------------                                                                         ---- __--__--
      Total cost of permanent work to June 30, 1934------------                                                                     535, 511. 74
Minus accounts payable June 30, 1934_--- ----------    __     ---                                                                    90, 201. 05

     Net total expenditures------------------------------   445,310. 69
Unexpended balance June 30, 1934--- ----------------------- 603, 989. 31

           Total amount appropriated to June 30, 1934                                                       -__________1, 049,300. 00

   Fiscal year ending June 30                         1930                     1931                 1932              1933               1934


Cost of new work..------------                   ----------------------------------------------                                        $535, 511.74
Cost of maintenance .
        Total expended ..........------------                    -----------           ----------------------------                     445, 310. 69
Allotted .........----------...          ..-------------------------------------                                 -------------.       1,049, 300. 00


Amount allotted from National Industrial Recovery Act approved
June 16, 1933     -----------------------------------                                                                         ', 429, 300.00

Amount to be accounted for    -----------------------------    1,429, 300. 00
Deductions on account of revocation of allotment---------------380, 000. 00

      Net amount to be accounted for ---------------------      1,049,300.00
Gross amount expended_-____ _____-__         -__  $447, 055. 36
Less reimbursements collected_  ---------------      1, 744. 67
                                                                  445, 310. 69

      Balance unexpended June 30, 1934____________------          __                                                                603, 989.31
Outstanding liabilities June 30, 1934______________     $90, 201. 05
Amount covered by uncompleted contracts---------. 513, 788.26
                                                                                                                                    603, 989. 31
    CONSOLIDATED             COST AND FINANCIAL SUMMARY                                   FOR LAKE ST.               CLAIR CHANNELS

Cost of new work to June 30, 1934  ________                                                                                  $3,597, 752. 74
Cost of maintenance to June 30, 1934----------------___--                                                                       850, 568. 07

      Total cost of permanent work to June 30, 1934                                                                           4, 448, 320. 81
Value of plant, materials, etc., on hand June 30, 1934                                                     ----------              1, 232. 47

      Net total cost to June 30, 1934----------------------                                                                   4, 449, 553. 28
Plus accounts receivable June 30, 1934--------                                                               -                        109. 80

      Gross total costs to June 30, 1934_______________________                                                               4, 449, 663. 08
Minus accounts payable June 30, 1934------------------------                                                                     109, 815. 72

     Net total expenditures-----------                                                                                         4, 339, 847. 36
Unexpended balance June 30, 1934                                                                                                  6---------------------
                                                                                                                                  033, 064. 58

           Total amount appropriated to June 30, 1934                                             ----                        4, 972, 911.94

     Fiscal year ending June 30                       1930                     1931                 1932              1933               1934

Cost of new work__. __-------__---------------- ---                                          $130, 856. 97          $95, 271. 26       $936, 141. 48
Cost of maintenance------------    $29, 904. 68 $122, 649. 97                                  16, 329. 12             1, 988. 64         1, 718. 71
        Total cost-          ..---------------       29, 904. 68           122, 649. 97           147, 186. 09       97, 259. 90        937, 860. 19
Total expended -----------------                     27, 873. 68           111, 781. 96           155, 258. 37       90, 073. 12        839, 573. 43
          --------------------
Allotted .......                                   112, 000. 00            216, 000. 00                      .      712, 331. 58        845, 569. 95
           RIVERS AND HARBORS-DETROIT, MICH., DISTRICT                          11.29
Balance unexpended July 1, 193---------------------------      $627, 068. 06
Amount allotted from National Industrial Recovery Act approved
  June 16, 1933-------------------------------------- 1, 429, 300. 00
     Amount to be accounted for----------------------         2, 0561, 368. 06
Deductions on account of revocation of allotment--------------583, 730. 05

      Net amount to be accounted for---------------------               1,472, 638. 01
Gross amount expended----------------                     $850, 007. 10
Less reimbursements collected--------------------           10, 433. 67
                                                                          839, 573. 43
      Balance unexpended June 30, 1934---------------------               633, 064. 58
Outstanding liabilities June 30, 1934--------------$109, 815. 72
Amount covered by uncompleted contracts---------- 520, 142. 57
                                                                          629, 958. 29

    Balance available June 30, 1934-------------------------                3, 10'6. 29
Accounts receivable June 30, 1934--_-------------------                        109. 80

       Unobligated balance available June 30, 1934-------------              3, 216. 09

Amount (estimated) required to be appropriated for completion
of existing project 1__________  __________________________              280, 000. 00

Amount that can be profitably expended in fiscal year ending June
30, 1936--
   For new work 1        ---------------------------------                120, 000. 00
   For maintenance 1-------------------------------------10',                  000. 00

        Total 1 ---     ---------------------------------------           130, 000. 00

                            6. DETROIT RIVER, MICH.

   Location.-This river connects Lakes St. Clair and Erie. (See
U. S. Lake Survey Chart No. 41.)
   Previous projects.-Acts of June 23, 1874, July 5, 1884, August 5,
1886, August 11, 1888, July 13, 1892, and March 3, 1899. The total
amount expended was $2,097,254. For further details see page 1958
of Annual Report for 1915.
   Existing project.-This provides for a 2-way channel 25 feet deep
and 800 feet wide through shoals at head of river, 26 feet deep and
800 feet wide through Fighting Island Channel, and 26 feet deep
and 600 feet wide through Ballardsl Reef north of junction with
Livingstone Channel; for a downbound channel, known as Living-
stone Channel, west of Bois Blanc Island, 26 feet deep and at least
450 feet wide from its upper end to opposite Bar Point, thence 26
feet deep and 800 feet wide to lower junction with Amhertsburg
Channel, thence 26 feet deep and 1,200 feet wide to the 26-foot con-
tour in Lake Erie, passing to the east of Detroit River Lighthouse,
the lower section, 1,200 feet wide, being used for both up and down-
bound traffic; for an upbound channel known as the Amherstburg
Channel, 21 feet deep and at least 600 feet wide from the lower junc-
tion with Livingstone Channel passing on the east side of Bois Blanc
Island to the head of Livingstone Channel; for an auxiliary down-
bound channel, 22 feet deep and 800 feet wide, passing to the west
of Detroit River Light; for a dike on the west bank of the rock cut
through Livingstone Channel to ameliorate cross currents; for a
compensating waste bank between Livingstone and Amherstburg
  1 Exclusive of available funds.
1130         REPORT OF            CHIEF OF ENGINEERS,                    U.      S.      ARMY,            19.3:4


Channels at their north junction; and for improving channels to
Wyandotte by removing shoal at head of Grosse Isle and by dredg-
ing through Grassy Island Shoal opposite the head of Fighting
Island. The following table shows the characteristic features of
the existing project:

                                                                    Used by
                                          Length Distance          upbound            Prot              Prot         Project
            Name of channel                  of    from            or down-            wiProjet         Project      datum
                                          channel mouth             bound                                            planes
                                                                    vessels

                                           Feet         Miles                            Feet            Feet          Feet
Shoals at head of Detroit River   _._.     23, 000         26. 0 Both......                  800           25       573. 1-572. 8
Fighting Island Channel _____--   ...._    26, 000         12.0 ___do......                  800           26       571. 9-571. 8
Ballards Reef Channel (north of junc-      14, 000          6.0 _do ...--                    600           26       571. 8-571. 5
  tion with Livingstone Channel).
Livingstone Channel----
                      ..-.-.--    . 43, 000 -Down--- Down...                                80             26       571. 5-570. 5
Livingstone Channel (lower end)-.....30, 000 ---------- Both..                            1,200            26              570.5
Amherstburg Channel........____      _.._ 38, 000       ________   Up ....--------
                                                                                     {       600
                                                                                             600
                                                                                                           22
                                                                                                           21
                                                                                                                   }571.5_570.
                                                                                                                    571
                                                                                                                        5-570.5
Cannel west of Detroit River Light__.      21. 500 --              Down....                  800           22              570. 5
Wyandotte Channel through Grassey           2, 400         16. 2   Both-.....                300           21. 0           571. 8
Island Shoal.
Orosse Isle Shoal----
                ....--   -__-             -__ 600          14. 2   Local_.            ..----------...      20              571. 8



    By authority of River and Harbor Act of March 2, 1919, the
channel passing to the west of Detroit River Lighthouse (formerly a
part of Amherstburg Channel) is now included in Livingstone
Channel project, and the channel to the east of Detroit River Light-
house (part of the original Livingstone Channel project) is now
included in Amherstburg Channel project.
    The project depths are referred to low-water datum for Lakes St.
Clair and Erie, which are taken at 573.5 and 570.5 feet, respectively,
above mean tide level at New York.
    Each year during the navigation season the river rises and falls
about 2 feet as measured by the monthly mean levels. In the past
72 years the difference between the highest and lowest monthly mean
levels during the navigation season has been about 4 feet. Oc-
casional fluctuations in depths of several feet, produced by high
easterly or westerly winds, respectively, raise or lower the water
level at the west end of Lake Erie, and similarly affect the level of
the lower Detroit River; such changes have been as much as 6 feet
within 8 hours.
    The estimate of cost for new work, revised in 1932, exclusive of
amounts expended on previous projects, is $22,000,000. The latest
 (1930) approved estimate for annual cost of maintenance is $38,000.
    The existing project was authorized by the following river and
harbor acts: The acts of June 13, 1902, March 3, 1905, and June 25,
1910, provided for the Amherstburg Channel and removal of Grosse
Isle Shoal (H. Docs. Nos. 712, 56th Cong., 1st sess., and 40, 58th
Cong., 3d sess.); the act of March 4, 1913, provided for the Fighting
Island Channel (H. Doc. No. 17, 62d Cong., 1st sess.); the acts of
March 2, 1907, June 25, 1910, March 2, 1919, provided for the
Livingstone Channel (H. Does. Nos. 266, 59th Cong., 2d sess.; 676,
'61st Cong., 2d sess.; and 322, 65th Cong., 1st sess.); and the act of
July 3, 1930, provided for channel depths of 25 and 26 feet (H. Doc.
No. 253, 70th Cong., 1st sess.). The latest published maps are in
          RIVERS AND HARBORS-DETROIT,       MICH.,   DISTRICT     1131
the last-mentioned document, and Rivers and Harbors Committee
Document No. 1, Seventy-second Congress, first session.
    Supplementing the work authorized by Congress the provision of
a channel 21 feet deep and 300 feet wide through the Middle Ground
opposite the head of Fighting Island as recommended by the Chief
of Engineers in Rivers and Harbors Committee Document No. 1,
Seventy-second Congress, first session, has been included in the
Public Works program under the National Industrial Recovery Act.
    Recommended modifications of project.-Included in Public Works
program.
    Terminal facilities.-Within the city of Detroit limits are more
than 6 linear miles of docks fronting on the river, and the appliances
for handling freight are adequate. A number of docks are owned
by railroads and large manufacturing corporations over which no
freight is received except for their own use. Other docks are owned
by steamship lines, where preference is given to their own vessels.
There are, however, still other docks that are open to the use of all
vessels upon equal terms, including one with a terminal warehouse.
These docks are adequate for the needs of the general commerce.
    Operations and results during fiscal ear-Regular funds-New
work.-Contract work was begun August 8, 1933, for deepening the
rock portion of Ballards Reef Channel (8,540 feet long) north of
the junction with Livingstone Channel; and other contract work
was continued for deepening the rock portion of Livingstone Chan-
nel (32,000 feet long); both under continuing contract authoriza-
tion. Material was removed in amounts of 149,240 cubic yards from
Ballards Reef Channel (all from east 300 feet); and of 538,946 cubic
yards from Livingstone Channel.
    Contract work was continued for deepening Fighting Island Chan-
nel and work was begun July 31, 1933, for deepening the earth
portion (13,000 feet long) of Livingstone Channel just southerly
from the rock portion of this channel. Material (mainly earth) was
removed in amounts of 347,537 cubic yards from Fighting Island
Channel and 1,286,600 cubic yards from Livingstone Channel.
   Maintenance.-The Amherstburg Channel, now used by both up-
bound and downbound traffic, was swept to locate obstructions to
navigation. Such obstructions were found and removed in amount
of about 360 cubic yards of boulders.
   Discharge measurements were continued to determine the volume
of flow, the effect of channel improvements upon lake levels, and
the location of necessary compensating works because of future chan-
nel deepening. For this purpose, three self-registering water gages
were maintained at about 21/-mile intervals along the Canadian
shore near the mouth of the river. One of these gages was operated
during the entire year, the others only when the river was free from
ice.
   Public Works funds-New wlork.-Contract work was in progress
for deepening the channel through the shoal areas at the head of
Detroit River for a length of 20,800 feet; for deepening the earth
portion of 5,460 feet length at the north end of Ballards Reef; for
deepening the channel to Lake Erie, about 14,500 feet long passing
east of Detroit River Lighthouse; and for dredging a channel to
Wyandotte, Mich., about 2,500 feet long across the north end of
Grassy Island. Material was removed in amounts of 321,808 cubic
1132         REPORT         OF     CHIEF OF ENGINEERS,                            U.     S. ARMY,         1934


yards from the channel at the head of Detroit River; 193,856 cubic
yards from Ballards Reef Channel (all from the east 300 feet);
28,850 cubic yards from the channel to Lake Erie; and 61,148 cubic
yards from the channel to Wyandotte, Mich. Work was begun at
the head of Detroit River, September 28, 1933, at Ballards Reef, Oc-
tober 2, 1933, at channel to Lake Erie, June 19, 1934, and at channel
to Wyandotte, November 2, 1933. Also, a portion at the outer end
of the channel to Lake Erie will be deepened by United States hop-
per dredge, and an expense was incurred in mobilizing this plant
prior to the close of the fiscal year.
   The costs during the fiscal year were distributed as follows:
                                                   REGULAR FUNDS

New work: Deepening downbound channels-------------------_ $1, 468, 779. 04
Maintenance :
   Removal of obstructions----------------------- $9, 680. 66
   Dredging by Government plant------------------ 4,213. 25
   Hydraulic measurements ------------------------    391. 40
                                                                14, 285. 31

          Total new work and maintenance-----------------------1, 483, 064.35
                                              PUBILIO WORKS FUNDS

New work: Deepening downbound channels--------------------                                                   233, 915.45

          Total, all funds---------------------------------------                                           , 716, 979. 80
  The total expenditures were $1,596,663.97, of which $1,392,519.26
were from regular funds and $204,144.71 from Public Works funds.
  Condition at end of fsoal year..--The existing project is about 33
percent completed. The work already done has consisted of dredg-
ing, rock excavation, and the construction of dikes and compensating
works. The dikes and compensating works are in good condition.
The following table gives project datum planes, controlling depths,
widths, lengths, and percentage of completion at the several channels
covered by the project at the close of the fiscal year.

                                                                   Con-    Mini-         Length
      Name of channel or locality                                 trolling mum           ofchan-     Percentage of comple-
                                                 tum plane         depth width             nel

                                                     Feet          Feet         Feet       Feet
Shoals at Head of Detroit River-         _ 573. 1-572.
                                        ..                    8     21.   5        800    20, 800   80.
Fighting Island Channel .       ....------------571.9-571.    7     21.   5        800    26, 000   Completed Dec. 2, 1933.
Ballards Reef Channel (earth)- ......           571. 7-571.   6     21.   5        600     5,460    150.
Ballards Reef Channel (rock).....--------. 571. 6-571.        5     21.   5        600     8, 540   1 20.
Livingstone Channel (rock) ......---------.      571. 5-570. 5     (2)             450    30, 000   45.
                                                                              3450-800     2,000
Livingstone Channel (earth)-..........                 570. 5       24. 0          800    13, 000 95.
Channel to Lake Erie passing east of
Detroit River Lighthouse.........------------         570. 5     417. 0-          400    34, 000   1.
                                                                    21.5           800
Channel to Lake Erie passing west of
  Detroit River Lighthouse------------.                570. 5       21. 5          800    21, 000   Completed in 1929.
Amherstburg Channel---__----                     571. 5-570. 5     21. 5-          600    40, 000   Completed in 1914.
                                                                    20. 5
Grosse Isle Shoal (opposite Wyandotte).                571. 7       19. 7 -----..--         ..... Completed in 1904.
                                                                                         --------
Wyandotte Channel (across Grassy
  Island)-----------------------------571. 8                        21.0           300     2,500    Completed Dec. 2, 1933.

  1East half of channel has been dredged, west half is used by navigation.
  2Closed to navigation.
  3 Channel sides flaring from 450 to 800 feet widths in 2,000 feet length.
  SNatural depths in east 400 feet, not improved.
          RIVERS AND HARBORS--DETROIT,                           MICH., DISTRICT       1133
  The costs have been as follows:
Regular funds:
   New work-                             ------------------------            $15, 445, 116. 46
   Maintenance      ----------------------------------------                      173, 069. 86
      Total   ------------------------------------------                      15, 618, 186. 32
Public Works funds: New work___________________________                           233, 915. 45

      Total all funds ---------------------------------                       15, 852, 101. 77
  The total expenditures were $15,681,903.61, of which $15,477,-
758.90 were from regular funds and $204,144.71 from Public Works
funds.
  Proposed operations.-The balance unexpended, including accounts
receivable at the end of the year, will be applied as follows:
Regular funds: Accounts payable, June 30, 1934_____        ______ $283, 500.00
New work:
    Continuing deepening of the rock section of Livingstone
      Channel for a length of 32,000 feet downstream from its
      junction with Ballards Reef Channel, under continuing
      contract in force; estimated date of completion, December
      1935     -------------------------------------------        1, 526, 000. 00
    Completion of deepening of the present channel through the
      rock section of Ballards Reef Channel by continuing con-
      tract in force; estimated date of completion June 1, 1935__    759, 500. 00
        Total ------------        ---------------------------- 2, 569, 000. 00
Maintenance: Removing obstructions, engineering, surveys, con-
tingencies--       -----  ----------------------------            30, 270. 63

      Total new work and maintenance---------                      __- -   -____2,599, 270. 63
  National Industrial Recovery Act funds.-The balance unex-
pended from funds allotted under the National Industrial Recovery
Act will be applied as follows:
Accounts payable, June 30, 1934______________-------_  --    -______ $75, 500. 00
Completion of deepening channel at head of Detroit River by
  contract in force, estimated date of completion, Aug. 13, 1934 __.  23, 000. 00
Completion of deepening of present channel to earth section of
  Ballards Reef (sec. -150 to -50) by contract in force; estimated
  date of completion, June 30, 1935---------6-----------------         5, 000. 00
Completion of deepening of present channel in earth section of
  Livingstone Channel (sec. 4500 to Lake Erie) by contract in
  force; estimated date of completion, Dec. 1, 1935_____________ 901, 300. 00
Deepening present channel in earth section of Livingstone Channel,
  section 4,500 to Lake Erie, by United States hopper dredges,
  June to November 1934 (60 percent completion) ____-- _____         156, 055. 29

      Total------         ------------------------------------                  1, 197, 855. 29
   The additional allotment of $960,000, made during July 1934, will
be applied to dredging by United States hopper dredges and clean-
up by U. S. derrickboat Merganser.
   The channels in lower Detroit River are used by all vessels plying
between the- upper and lower lakes. The continuing contract for
deepening of the Livingstone Channel should be carried to comple-
tion as early as practicable. The volume and importance of the
commerce make necessary the maintenance of project depth in the
completed channels. During the progress of deepening Livingstone
Channel, all traffic is being diverted to the Amherstburg Channel.
 1134              REPORT OF -CHIEF                           OF ENGINEERS, U. S. ARMY,                                    1934

and annual examination by sweeping the latter channel are necessary,
as well as occasional examinations of like character due to vessel
touches. Obstructions found as a result of such examinations are
promptly removed. The Amherstburg Channel is subject to shoaling
by deposit of silt and sand at the outer end. Such shoals should be
removed, preferably by United States hopper dredges.
   The funds that can be profitably expended during the fiscal year
ending June 30, 1936 ($758,000) will be applied about as follows:
New work: Completion of continuing contract for deepening the rock
   section of Livingstone Channel; estimated date of completion,
   December 1935-----------------------------------------              $740, 000
Maintenance:
     Dredging by United States hopper dredge, one-half
        month--------------------------------------           $10, 000
     Sweeping Amherstburg Channel and removal of obstruc-
        tions by United States plant-----------------------3,      000
     Engineering, surveys, contingencies------------------- 5, 000

              Total ------------------------------------------------                                                                  18, 000

Total new work and maintenance----------------------------                                                                          758, 000

                                                       Cost and financial summary
                                        MAINTENANCE                AND      IMPROVEMENT                 FUNDS

Cost of new work to June 30, 1934---------------------- $17, 542, 370. 46
Cost of maintenance to June 30, 1934------------------------173, 069. 86
      Total cost of permanent work to June 30, 1934 --         17, 715, 440. 32
Value of plant, materials, etc., on hand June 30, 1934--------     127, 611. 03

      Net total cost to June 30, 1934-------------------- 17, 843, 051. 35
Plus accounts receivable June 30, 1934----------------------   15, 468. S3
     Gross total costs to June 30, 1934-------------------17, 858, 520. 18
Minus accounts payable June 30, 1934------------------------  283, 507. 28
     Net total expenditures----                                           -----------------------   17, 575, 012. 90
Unexpended balance June 30, 1934                                               --------------------- 2, 583, 801. 80
              Total amount appropriated to June 30, 1934                                                                   20, 158, 814. 70

     Fiscal year ending June 30                            1930              1931                1932               1933              1934

Cost of new work--------------..............             $57, 171. 57 -         ------------                    $868, 004. 38    $1, 468, 779. 04
                         -
Cost of maintenance-.-_--.                     --.        16, 820. 16      $18, 289. 90        $11, 162. 23.        9, 014. 05        14, 285. 31
          Total cost....---------------............       73, 991. 73       18, 289. 90         11, 162. 23      877, 018. 43     1, 483, 064. 35
Total expended -----.--.-                                 77, 973. 85       40, 338. 89         89, 558. 78      703, 811. 01     1, 392, 519. 26

Allotted.........................
              ----------------                  ----      56, 500. 00       18, 000. 00        266, 534. 43    1, 103, 636. 91    3, 366, 562. 74


Balance unexpended July 1, 1933                                   $609, 758. 32
                                                    .------------------------
Amount allotted from War Department Appropria-
  tion Act approved Apr. 26, 1934_------------ $1, 851, 000. 00
Amount allotted from War Department Appro-
  tion Act approved July 14, 1932-               , 603, 520.96
                                                1----------
                                                                3, 454, 520. 96

     Amount to be accounted for      --                                                                                     4, 064, 279. 28
Deductions on account of revocation of allotment-------                                                                         87, 958. 2
                                     ....
       Net amount to be accounted for--                                                                                     3, 976,321.06
Gross amount expended-----                                                                        $1,494,507.94
                     RIVERS AND HARBORS-DETROIT, MICH., DISTRICT                                                                               1135
Less:
    Reimbursements collected ------- $101, 980. 70
    Receipts from sales---  ______    -      7. 98
                                                                                                            $101, 988. 68
                                                                 $1, 392, 519. 26
      Balance unexpended June 30, 1934-------------------         2, 583, 801. 80
Outstanding liabilities June 30, 1934_______-- ___ $285, 194. 37
Amount covered by uncompleted contracts------       401, 809. 67
                                                                     687, 004. 04
      Balance available June 30, 1934--------------------1,896, 797.76
Accounts receivable June 30, 1934------------ --     -----            15,468. 83
      Unobligated balance available June 30, 1934 _______._ 1,912, 266. 59
Amount (estimated) required to be appropriated for completion
    of existing project 1----------------                                                                                              740, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1936:
   For new work --------------------------------------                                                                                740, 000. 00
        maintenance 1 ------------------------------------
   For For
        maitenance               ______________________                                                                                     000.00
                                                                                                                                      1 18, 00.0
            Total --                 --               -------                                    --------                              758, 000.00

                                                                PUBLIC WORKS FUNDS

Cost of new work to June 30, 1934 ___-.-.--------------                                                                         - $233, 915. 45
Cost of maintenance to June 30, 1934-------                                                                                       ----
      Total cost of permanent work to June 30, 1934----------                                                                          233, 915. 45
Value of plant, materials, etc., on hand June 30, 1934------------                                                                      45, 755. 49
      Net total cost to June 30, 1934_______________________                                                                           279, 670. 94
Minus accounts payable June 30, 1934______________-__-_____                                                                             75, 526. 23

     Net total expenditures--_ -------------------------     204, 144.71
Unexpended balance June 30, 1934_________________________ 1, 197, 855.29
             Total amount appropriated to June 30, 1934                                                         ----     __        1, 402, 000. 00

     Fiscal year ending June 30                                 1930        1931                   1932                  1933                 1934


Cost of new work......----------                       -------------   ------------           --------                       ....-------------$233, 915. 45
Cost of maintenance- .-------------------------------------
         Total expended...----------------------------                                   -------------- --------------                       204, 144. 71

Allotted.---------------.......--------------------                                   ------------..           ..--------------...        1, 402, 000. 00



Amourt allotted from National Industrial Recovery Act, ap-
proved June 16, 1933___________________________________                                                                        $2, 017, 000. 00
Deductions on account of revocation of allotment----------_                                                                         615, 000. 00
      Net amount to be accounted for---------------------                                                                         1,402, 000. 00
Gross amount expended______________ $204, 376.11
Less reimbursements collected ____________--_____   231. 40
                                                                                                                                        204, 144. 71
      Balance unexpended June 30, 1934 ___________________                                                                           1, 197, 855. 29
Outstanding liabilities June 30, 1934----------$75, 689. 62
Amount covered by uncompleted contracts        1, 011, 864. 53
                                                                                                                                     1, 087, 554. 15
     Balance available June 30, 1934 ______-- _______________                                                                           110, 301. 14
Amount allotted by Public Works Administration Emergency
Appropriation Act, fiscal year 1935-----         -   -----                                                                            960, 000. 00
             Balance available for fiscal year 1935-......                                                     -         -           1, 070, 301. 14
    'Exclusive of available funds.
         91536-ENG 1934-      72
1136        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                    1934

      CONSOLIDATED          COST AND          FINANCIAL          SUMMARY      FOR DETROIT          RIVER,      MICH.


Cost of new work to June 30, 1934________________
                                    ..                       $17, 776, 285. 91
Cost of maintenance to June 30, 1934--      _______-________      173, 069. 86
      Total cost of permanent work to June 30, 1934_________                                             17, 949, 355. 77
Value of plant, materials, etc., on hand June 30, 1934________-                                              173, 366. 52
      Net total cost to June 30, 1934 ____________________                                               18, 122, 722. 29
Plus accounts receivable June 30, 1934__
                                       -----   ________-                                                      15, 468. 83
      Gross total costs to June 30, 1934_______________   __                                             18, 138, 191. 12
Minus accounts payable June 30, 1934_______________________                                                  359, 033. 51
     Net total expenditures__________________________                                                    17, 779, 157. 61
Unexpended balance June 30, 1934__________________________                                                3, 781, 657. 09
          Total amount appropriated to June 30, 1934___________                                          21, 560, 814. 70

   Fiscal year ending June 30                   1930             1931           1932              1933              1934

Cost of new work.._____________             $57,171.57--------------------$868,                      004. 38    $1, 702, 694. 49
Cost of maintenance .       __---             16, 820. 16      $18, 289. 90   $11, 162. 23        9, 014. 05         14, 285. 31
       Total cost     --------------          73, 991. 73       18, 289. 90    11, 162. 23     877, 018. 43      1, 716, 979. 80

Total expended.......--------------           77, 973. 85       40, 338. 89   89, 558. 78      703, 811. 01      1, 596, 663. 97

Allotted----.................   ..---------------56, 500. 00    18, 000. 00   266, 534. 43   1, 103, 636. 91     4, 768, 562. 74


Balance unexpended July 1, 1933______ _      __________________                                            $609, 758. 32
Amount allotted from War Department Appro-
  priation Act approved Apr. 26, 1934____-____ -   $1, 851, 000. 00
Amount allotted from War Department Appro-
  priation Act approved July 14, 1932__________ 1, 603, 520; 96
Amount allotted from National Industrial Recov-
  ery Act approved June 16, 1933 -----------     _ 2, 017, 000. 00
                                                                                                          5, 471, 520. 96
     Amount to be accounted for_____________________________ 6, 081, 279. 28
Deductions on account of revocation of allotment__ _________702, 958. 22
      Net amount to be accounted for--_---___       _______-__                                            5, 378, 321. 06
Gross amount expended-_____________________ $1, 698, 884.05
Less:
    Reimbursements collected---- $102, 212. 10
    Receipts from sales ___-   -__---         7. 98
                                                        102,220. 08
                                                                                                          1, 596, 663. 97
      Balance unexpended June 30, 1934 -__-__-    ________-_                                              3, 781, 657. 09
Outstanding liabilities June 30, 1934 ___________ $360, 883. 99
Amount covered by uncompleted contracts------- 1, 413, 674. 20
                                                                                                          1, 774, 558. 19
     Balance available June 30, 1934---------------------                                                 2, 007, 098. 90
Accounts receivable June 30, 1934__    ____________________                                                   15, 468. 83
     Unobligated balance available June 30, 1934                                 ------------             2, 022, 567. 73
Amount allotted by Public Works Administration Emergency
Appropriation Act, fiscal year 1935_______________________                                                    960, 000. 00
          Balance available for fiscal year 1935__________________                                        2, 982, 567. 73
Amount (estimated) required to be appropriated for completion
of existing project 1 ----     -_-- ---
                                      __740, --    ---      --                                                       000. 00
   'Exclusive of available funds.
            RIVERS AND HARBORS-DETROIT,                                 MICH.,   DISTRICT        1137
Amount that can be profitably expended in fiscal year ending
June 30, 1936 :
   For new work 1$_________             __ ____$________                                $740, 000.00
   For maintenance _-------------------______      ---                                       18, 000.00

        Total 1--------------------------------------------                                 758, 000.00

                                   7. ALPENA                  HARBOR,   MICH.

   Location.-Located on the northwest shore of Thunder Bay, Lake
Huron. The river has its source in Montmorency and Alpena Coun-
ties, Mich., and empties into Thunder Bay. (See U. S. Lake Survey
Chart No. 5.)
   Previous projects.-Acts of August 14, 1876, and August 2, 1882.
The total amount expended was $18,888.70. For further details see
page 1957 of Annual Report for 1915.
   Existing project.-This provides for a channel 161/2 feet deep from
that depth in Thunder Bay to a point on Thunder Bay River seven-
eighths mile above the lighthouse; for the protection of the said
channel on the south side by the construction of a rubble mound over
a length of about 660 linear feet landward from the end of the old
docks and by the construction of a rubble breakwater from the same
point lakeward for a distance of about 370 feet; for channel width
of 200 feet from the 161/ 2 -foot contour in Thunder Bay to the outer
end of the breakwater, thence tapering to 100 feet in a distance of
about 500 feet, thence 100 feet to Second Avenue Bridge, thence 75
feet for 1,600 feet, and thence 50 feet to upper limit of improve-
ment. The total length of the river included in the project is 4,620
feet, and the improved channel extends 2,500 feet farther into the
bay beyond the lighthouse.
   The project depth is referred to low-water datum for Lake Huron,
which is taken at 578.5 feet above mean tide level at New York.
Each year the level of Thunder Bay River rises and falls about 31
feet. From day to day the level changes somewhat, due to wind
and barometric pressure, such changes frequently amounting to
more than a foot. The estimate of cost for new work, revised in
1928, is $150,000, exclusive of amounts expended on previous proj-
ects. The latest (1928) approved estimate for annual cost of main-
tenance is $5,000.
   The existing project was adopted by the following river and har-
bor acts: The act of September 19, 1890, provided for the dredging
 (Annual Report for 1889, p. 2288); and act of March 2, 1919, as
amended by act of September 22, 1922, provided for the other fea-
tures (H. Doc. No. 830, 65th Cong., 2d sess., and Rivers and Harbors
Committee Document No. 1, 67th Cong., 1st sess.). The latest pub-
lished maps are in House Document No. 830, Sixty-fifth Congress,
second session, and River and Harbor Committee Document No. 42,
Seventy-second Congress, first session.
   Recommended modifications of project.-Under date of June 29,
1932, the Chief of Engineers recommended modification of the exist-
ing project so as to provide for a channel 200 feet wide and 21 feet
deep, from that depth in Thunder Bay to the outer end of the exist-
ing Federal project channel; for deepening the present Federal
project channel to 181/2 feet, with existing widths from its outer
  1Exclusive    of available funds.
1138        REPORT OF            CHIEF OF ENGINEERS,                             U. S.    ARMY,           1934


end to the upper end of the Fletcher Paper Co. dock, about four-
fifths mile above the lighthouse; and for a turning basin near the
latter point, 15, feet deep and about 160,000 square feet in area, at
an estimated cost of $94,000, with $2,500 annually for maintenance
in addition to that now required. (Rivers and Harbors Committee
Doc. No. 42, 72d Cong., 1st sess.)
   Local cooperation.-Complied with.
   Terminal facilities.-There are docks for total lengths of about
2,000 feet on the right bank and about 2,100 feet on the left bank.
These docks are privately owned, but about 800 feet length of that
on the right bank is open to public use on equal terms. These
terminal facilities are considered adequate for the existing
commerce.
   Operations and results during fiscal year.-A survey was made
during October 1933 to determine channel depths.
   The costs and expenditures during the fiscal year were $518.08,
paid from allotment for examinations, surveys, and contingencies of
rivers and harbors.
   Condition at end of fiscal year.-The existing project is about 80
percent completed. The work remaining to be done is a small por-
tion of the channel widening in the bay section at the river mouth,
and the excavation of rock for a length of about 1,000 feet at the
upstream end, where there is a least depth of about 11 feet. The
widening of the bay section will be completed in connection with
maintenance dredging. The work done consisted in dredging a chan-
nel in Thunder Bay and River and in the construction of a rubble
breakwater near the mouth of the river, the latter being completed
in 1924. The controlling depth, as determined by survey of 1933,
was 15 feet at present datum. The head of navigation is a dam
about 1 mile above the mouth of the river.
   The costs and expenditures have been $107,032.67 for new work
and $111,676.79 for maintenance, a total of $218,709.46.
   Proposed operations.-No funds are available and no work is con-
templated during the fiscal year ending June 30, 1935.
   The commerce using this harbor requires full project dimensions
up to the Fletcher Paper Co. dock. The sum of $5,000 can be profit-
ably expended for maintenance dredging during the fiscal year
ending June 30, 1936.
                                      Cost and financial summary

Cost of new work to June 30, 1934                                   ----------                                 $125, 921. 37
Cost of maintenance to June 30, 1934_________________________                                                   111, 676. 79

      Total cost of permanent work to June 30, 1934--_______                                                    237, 598. 16
Net total expenditures___________________________-                                                              237, 598. 16
      Total cost of permanent work to June 30, 1934___________                                                  237, 598. 16

        Fiscal year ending June 30                       1930          1931            1932             1933          1934

Cost of new work......--                      -      -        -..-                 -       --      --       -
Cost of maintenance...._-_....-._...                      $21. 99 ------------         $678. 32      $18, 045. 18    ---
Total expended_----------------_---               _ -- - 31. 93 ------------             796. 52      17, 926. 98   ----. --
Allotted--....--..--------------.-------...              -151. 91--------------800. 00                17, 923. 50
               RIVERS AND HARBORS-DETROIT,                             MICH.,       DISTRICT             1139
Amount (estimated) required to be appropriated for completion
of existing project 1-----------------------------------------.                                    $43, 000. 00
Amount that can be profitably    expended in fiscal year ending June
                           1- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
30, 1936, for maintenance                                                                            5, 000. 00

                                   8. SAGINAW RIVER, MICH.

   Location.--This river is formed by the union of the Tittabawassee
and Shiawassee Rivers and discharges into the south end of Sagi-
naw Bay, Lake Huron. (See U. S. Lake Survey Chart No. 5.)
   Previous projects.-Acts of June 23, 1866, June 23, 1874, June 18,
1878, March 3, 1879, August 2, 1882, and August 5, 1886. The total
amount expended on all projects, and the total cost, prior to the
adoption of the existing project in 1910, was $962,556.26. (For
further details see page 1957 of Annual Report for 1915.)
   Existing project.-This provides for a channel 181/2 feet deep and
200 feet wide from deep water in Saginaw Bay to the Sixth Street
Bridge in Saginaw, Mich., thence 162 feet deep to the junction
with the Tittabawassee River, a distance of 27 miles. The project
depth is referred to low-water datum for Lake Huron, which is
taken at 578.5 feet above mean tide level at New York. Due to
storms the level of the river at its mouth rises and falls about 3
feet. Spring freshets and excessive rains have caused an abnormal
rise of as much as 14 feet at Saginaw. Occasionally a considerable
change takes place within a few hours, resulting from the raising
or lowering of Saginaw Bay by violent winds.
   The estimate of cost for new work, revised in 1930, was $1,600,000,
exclusive of amounts expended on previous projects. The latest
 (1930) approved estimate for annual cost of maintenance is $80,000.
   The existing project was adopted by the following river and harbor
acts: The act of June 25, 1910, provided for a channel 200 feet
wide, with depths of 181/ feet in the bay and 16           feet in the
river (H. Doc. No. 740, 61st Cong., 2d sess.), and the act of July
3, 1930, provided for the present dimensions of the project (Rivers
and Harbors Committee Doc. No. 30, 71st Cong., 2d sess.). The
latest published map of the locality is in the latter document.
   Local cooperation.-Complied with.
   Terminal facilities.-General utility docks, all privately owned,
are located at Essexville and Bay City. The aggregate length of
these docks is about 2,700 feet. Similar docks with a total length
of about 1,000 feet are located in the upper river at Saginaw. In
addition, the Chevrolet Motor Co. operates an industrial dock, about
600 feet long at Saginaw and the Consumers Power Co. owns and
operates a dock about 1,100 feet long at Zilwaukee. Turning basins
have been constructed by the owners opposite the latter 2 docks.
There is also under construction a dock, 600 feet long, for the ex-
clusive use of the owner by the Dow Chemical Co. opposite Es-
sexville. These terminal facilities are adequate for the existing
commerce.
   Operations and results during fiscal year- Maintenance.-Dredg-
ing under contract was begun June 29, 1934, to restore project depth
  1
      Exclusive of available funds.
1140       REPORT          OF     CHIEF OF ENGINEERS,                    U.    S.    ARMY,           1934


in Saginaw River between Sixth Street Bridge and Court Street
Bridge at Saginaw. Material was removed in amount of 152 cubic
yards. Dredging by United States hopper dredge Meade from
mouth of river to Essexville was in progress July 27-August 25, 1933,
and material was removed in amount of 65,494 cubic yards, bin
measurement.
   The total costs, all for maintenance, were $20,164.22 and the total
expenditures were $19,966.34.
   Condition at end of fiscal year.-The project was completed in 1932
at a saving of $30,473 under the estimated cost. Maintenance dredg-
ing in the outer end of the 181/2-foot project has maintained full
project depth and width in the channel from the bay to the Sixth
Street Bridge at Saginaw. From Sixth Street Bridge to Court
Street Bridge, where work is now in progress, the controlling draft
is about 13 feet at datum for a channel width of 200 feet; above Court
Street Bridge to the upper limit of the project, the controlling depth
is about 111/2 feet at datum. The costs have been $1,569,526.96 for
new work and $527,005.28 for maintenance, a total of $2,096,532.24.
The total expenditures were $2,096,342.34.
   Propoised operations.-The balance unexpended at the end of the
year ($117,479.57) will be applied about as follows:
Accounts payable, June 30, 1934_____________----------------                                                     $189. 90
Maintenance :
    Maintenance dredging from Court Street to Sixth Street in
      Saginaw, under contract in force; estimated date of comple-
      tion, June 30, 1935     __      ____________                                                             88, 210. 00
    Maintenance dredging in river and bay channels by United
      States hopper dredge, 1 month, July-August 1934-----------                                               29, 079. 67

          Total----------------------------------------                                                    117, 479. 57
   This river is subject to extensive shoaling. Commerce using this
river requires full project dimensions. The sum of $30,000 can be
profitably expended during the fiscal year ending June 30, 1936, to be
applied to maintenance dredging in river and bay channels by United
States hopper dredge.
                                        Cost and financial summary

Cost of new work to June 30, 1934_ ....                                                              $2, 532, 083. 22
Cost of maintenance to June 30, 1934------------------------                                             527, 005. 28

     Total cost of permanent work to June 30, 1934                            -----------             3, 059, 088. 50
Minus accounts payable June 30, 1934________________________                                                  189. 90

     Net total expenditures -----------------------------                                             3, 058, 898. 60
Unexpended balance June 30, 1934__________________________                                               117, 479. 57
       Total amount appropriated to June 30, 1934 -------------                                       3, 176, 378. 17

   Fiscal year ending June 30              1930            1931            1932               1933                1934

Cost of new work   ...
                   _________------------                  $2, 335. 00   $526, 973. 19      $269, 083. 83   -
                   . -----.... $53, 611. 65
Cost of maintenance---                                    25, 928. 33          17. 50 ----             _         $20, 164. 22

     Total cost ..-----....----------     53, 611. 65     28, 263. 33    526, 990. 69      269, 083. 83           20, 164. 22

Total expended -----------------          59, 817. 76     30, 375. 72    447, 974. 50      549, 130. 02           19, 966. 34
Allotted-----------      -----------      17, 600. 00   200, 000. 00     250, 000. 00      361, 273. 44          118, 931. 77
           RIVERS AND HARBORS-DETROIT,              MICH., DISTRICT           1141
Balance unexpended July 1, 1933-----___---------__           -_ $18, 514. 14
                                                           -__
Amount allotted from War Department Appropriation Act Approved
  Mar. 4, 1933----------------------------------------          119, 000.00
      Amount to be accounted for------                             137, 514. 14
Deductions on account of revocation of allotment------------------       68. 23

      Net amount to be accounted for         ---------------------     137,445.91
Gross amount expended --                         __----   $19, 978. 10
                                                           1__-----___
Less:
    Reimbursements collected ___-__--              _ $7.98
    Receipts from sales _____________-            __ 3. 78
                                                                 11. 76
                                                                          19, 966. 34

      Balance unexpended June 30, 1934 __-__--------------              117,479. 57
Outstanding liabilities June 30, 1934____1111111111        1   $189. 90
Amount covered by uncompleted contracts -           ------   88, 275.66
                                                                         88, 465. 56
       Balance available June 30, 1934_____--------------                 29, 014. 01

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance _______________________________                30, 000. 00

9. HARBOR OF REFUGE AT HARBOR BEACH, LAKE HURON, MICH.

   Locatio.-This harbor is located on the west shore of Lake Huron.
 (See U. S. Lake Survey Chart No. 5.)
   Existing project.-This provides for the formation of a harbor of
refuge protected by stone-filled timber-crib breakwaters-the main
breakwater being 4,716 feet long, the north one 1,204 feet long and
attached to the main breakwater, the original north entrance, 304
feet wide, being reopened to a depth of about 9 feet, and the south
breakwater 1,956 feet long. The entrance channel between the main
and south breakwaters is 600 feet wide and 21.9 feet deep. The
anchorage area is approximately 3,000 feet long by 1,200 feet wide
and 19.9 feet deep.
   The project depths are referred to a stage 578.5 feet above mean
tide at New York. The normal elevation of the water surface in
Lake Huron varies from year to year. During each year the level
is subject to a seasonal rise and fall, the lowest stages prevailing dur-
ing winter and the highest during summer months. Such yearly
changes, measured by monthly mean levels, may be as much as 1.8
feet. During the past 23 navigation seasons the difference between
the highest and lowest monthly mean levels during the navigation
season has been about 4.9 feet. Occasional fluctuations, due to winds
of high velocity, may be as much as 2 feet in 8 hours.
   The estimate of cost for new work, revised in 1917, was $1,658,550.
The latest (1917) approved estimate for annual cost of maintenance
is $10,000.
   The existing project was adopted by the following river and har-
bor acts: The act of March 3, 1871, adopted the site and made
provision for the harbor (Annual Report for 1873, p. 292); the act
of June 19, 1882, appropriated $10,000 for the purchase or hire of a
boat for use in enforcing harbor regulations; the act of August 8,
1917, provided for closing the north entrance and dredging the main
  'Exclusive   of available funds.
1142       REPORT        OF CHIEF OF          ENGINEERS, U.              S. ARMY,        1934

entrance and the anchorage area (H. Doc. No. 1700, 64th Cong.,
2d sess.). The latest published map is in the project document.
   The act of January 21, 1927, authorizes the Secretary of War to
remove such portion of the breakwater, in the interest of sanitation,
as will not be detrimental to purposes of navigation.
   Terminal facilities.-There is but 1 dock about 500 feet long.
This dock is privately owned, but it is open to all vessels upon equal
terms. Terminal facilities are considered adequate for the existing
commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal ylear.-The existing project was com-
pleted in 1928 at a saving of $457,951 under the estimated cost. The
work consisted in the construction of 3 breakwaters, the dredging of
an entrance channel, and the dredging of an anchorage area about
72 acres in extent under the protection of the breakwaters. The
breakwaters were originally built in 1885, and since that time it has
been necessary to top them with concrete and to protect about 6,170
feet of the outer face with heavy riprap. The north entrance was
closed by rubble mound in 1920 and reopened to about 10 feet depth
in 1928. Dredging was completed in 1922.
   The harbor has controlling depths of 20.5 feet at its entrance and
about 18 feet within anchorage area, as shown by survey of 1928.
The breakwaters are in fair condition, except that riprap along lake
face of main breakwater needs repair, and some fenders on harbor
face of main breakwater need replacing.
   The costs and expenditures have been $1,200,598.17 for new work
and $1,467,239.92 for maintenance, a total of $2,667,838.09.
   Proposed operations.-No funds are available and no work is con-
templated during the fiscal year ending June 30, 1935.
   Due to exposure to severe wave action, occasional repairs or re-
placements of riprap are necessary. The sum of $5,000 can be profit-
ably expended for such maintenance work during the fiscal year
ending June 30, 1936.
                                 Cost and financial summary

Cost of new work to June 30, 1934------------------------ $1, 200, 598.17
Cost of maintenance to June 30, 1934 ---   __-----------   1, 467, 239. 92

      Total cost of permanent work to June 30, 1934----------                              2, 667, 838. 09
Net total expenditures----------------------------------                                   2, 667, 838.09
Total amount appropriated to June 30, 1934 ______________                                  2, 667, 838. 09

        Fiscal year ending June 30              1930         1931          1932         1933        1934


Cost of new work -- - - - - - - - - -          I- --
                                              ..                   -     - - - - - ---- - _.
Cost of maintenance___ .. ...
                            ______ ____         $51. 89 ------------    $27, 102. 42--------------------
Total expen ded- -   -_______-        _ - _
                                     ___         73. 38    $1,353.43     25, 663.22__              ------
Allotted..------------------------------500.00             22, 500.00       588.32


Amount that can be profitably expended in fiscal year ending June 30,
1936, for maintenance 1----------------                              $5, 000

   1 Exclusive of available funds.
         RIVERS AND HARBORS-DETROIT, MICH., DISTRICT             1143
                      10. BLACK RIVER, MICH.

   Location.-This river has its source in the northern part of Sani-
lac County, Mich., and empties into the St. Clair River. (See U. S.
Lake Survey Chart No. 43.)
   Previous projects.-Authorized by acts of June 10, 1872, and
August 11, 1888. The total expenditures and the total costs under
these projects prior to the consolidation of the projects for Black
River and mouth of Black River was $97,856.89, of which $85,848.58
was for new work and $12,008.31 was for maintenance. For further
details see page 1441 of Annual Report for 1916.
   Existing project.-This provides for a channel 17 feet deep from
deep water in St. Clair River to the Grand Trunk Railroad bridge,
160 feet wide at the mouth, decreasing to 100 feet about 800 feet from
the mouth, thence 100 feet wide for 2,600 feet, decreasing to 75 feet
for a distance of 4,800 feet at the upper end; and for a settling basin
75 feet wide and 19 feet deep, beginning at the Grand Trunk Rail-
road bridge in Port Huron and extending upstream a distance of
about 2,300 feet. The length of the section included in the project
is 10,500 feet. The project depth is referred to local low-water
datum in the St. Clair River at the mouth of the Black River, which
is taken at 577.5 feet above mean tide at New York. Each year the
level of the river rises and falls from 4 to 6 feet, due to the fact
that spring freshets raise the level considerably above the normal.
The level also changes from day to day, due to winds, such changes
amounting to several inches.
   The estimate of cost for new work, revised in 1930, exclusive of
amounts expended on previous projects, was $60,700. The latest
 (1928) approved estimate of annual cost of maintenance is $7,000.
   The existing project was authorized by the following river and
harbor acts: The act of September 19, 1890, provided for the chan-
nel from the mouth to the Grand Trunk Railroad bridge (Annual
Report of 1889, p. 2291); the act of July 13, 1892, provided for
the section thence to Washington Avenue (no printed report) ; the
act of September 22, 1922, consolidated the projects for Black River
at Port Huron and mouth of Black River (H. Doc. No. 436, 64th
Cong., 1st sess.) ; and the act of July 3, 1930, provided for the set-
tling basin (H. Doc. No. 162, 71st Cong., 2d sess.). The latest pub-
lished maps are in House Document No. 436, Sixty-fourth Congress,
first session, and Rivers and Harbors Committee Document No. 54,
Seventy-second Congress, second session.
   Recomended modifications of project.-Under date of January
25, 1933, the Chief of Engineers recommended modification of the
existing project so as to provide for deepening the channel and set-
tling basin to 20 feet and for widening to 100 feet two bends, one
at the foot of Twelfth Street and the other below the Grand Trunk
Railroad bridge, at an estimated cost of $86,000, with $2,000 annually
for maintenance in addition to that new required, subject to certain
conditions of local cooperation. (Rivers and Harbors Committee
Doc. No. 54, 72d Cong., 2d sess.)
    Terminal facilities.-There are docks on both sides of Black River,
near its mouth and between these docks and the upper limit of im-
provement there are five other docks varying in length from 100 to
500 feet. All docks are privately owned, and are restricted to the
1144         REPORT           OF CHIEF OF ENGINEERS, U.                         S.     ARMY,       1934

use of the owners. The present terminal facilities are considered
adequate for the existing commerce.
  Operations and results during fiscal year.-Maintenance dredging
under contract between the Seventh Street and Grand Trunk Rail-
road bridges was begun May 31, 1934, and completed June 11, 1934.
The total quantity removed was 4,126 cubic yards, place measure-
ment, at a total cost and expenditure of $8,581.56 for maintenance.
  Condition at end of fiscal year.-The existing project was com-
pleted in 1931. As a result of dredging in 1934, the channel has a
minimum width of 75 feet at full project depth. Some shoaling has
occurred in the settling basin, where depths are about 9 feet.
   The costs and expenditures have been $54,474.29 for new work and
$154,549.17 for maintenance, a total of $209,023.46.
   Proposed operations.-The balance unexpended at the end of the
year, $6,650.35, will be applied to maintenance dredging by contract
during September 1934 and May 1935.
   The commerce using this channel requires full project dimensions.
The sum of $15,000 can be profitably expended during the fiscal year
ending June 30, 1936, to be applied to maintenance dredging by
contract.
                                           Cost and financial summary
Cost of new work to June 30, 1934_  ___      ---             $140, 322. 87
Cost of maintenance to June 30, 1934------------------------  166, 557. 48
           Total cost of permanent work to June 30, 1934 -----------                                     306, 880. 35
Net total expenditures---------------------------------                                                  306, 880. 35
Unexpended balance June 30, 1934-------------------------                                                  6, 650. 35
           Total amount appropriated to June 30, 1934 --------------                                     313, 530. 70

           Fiscal year ending June 30          °      1930          1931             1932         1933           1934


                           ........
Cosl of new work---------------..                                 - $178.77     $19, 596. 87 ..------------------
Cost of maintenanc.e-....----------------           $6, 210. 57   12, 795. 68     2, 099. 97      -$0. 25       $8, 581. 56
        Total cost_-_______-
                      -                -   ____--    6, 210. 57   12, 974. 45    21, 696. 84        -. 25        8, 581. 56

Total expended--           --------------------- 6, 069. 43       10, 182. 90    24, 234. 63       365. 06       8, 581. 56

Allotted- --------------------------                 7, 300.00    27, 703. 76   -2, 000. 00    -1, 035. 33      15, 231.91


Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934             -------        $5, 000. 00
Amount allotted from War Department Appropriation
Act approved July 14, 1932 --------------------------  3, 741. 20
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933------------------------      6, 500. 00

Amount to be accounted for-----------------                                                              $15, 241. 20
Deductions on account of revocation of allotment----------                                                      9. 29

      Net amount to be accounted for-----------------------                                                  15, 231. 91
Gross amount expended ------------------------------------
I
                                                                                                              8, 581. 56

        Balance unexpended June 30, 1934_                                                                      , 650. 35
                                                                                                              6-----------------------
    Amount covered by uncompleted contracts----------------                                                      478. 54

           Balance available June 30, 1934_                                                                    , 171. 81
                                                                                                              6-------------------------

    Amount that can be profitably expended_ in fiscal year ending June
      30, 1936, for maintenance 1_____                              _--
                                                          _- _ ______--                                      15, 000. 00

      1Exclusive of available funds.
         RIVERS AND HARBORS-DETROIT,        MICH.,   DISTRICT     1145
                      11. ROUGE RIVER, MICH.

   Location.-The river rises in Oakland and Washtenaw Counties,
Mich., and empties into the Detroit River. (See U. S. Lake Survey
Chart No. 415.)
   Previous projects.-Authorized by the act of August 11, 1888,
 (Annual Report for 1887, pp. 2275-2278); joint resolution of April
11, 1898 (H. Doc. No. 138, 55th Cong., 2d sess., and Annual Report
for 1898, p. 2605), and the act of March 2, 1907 (H. Doc. No. 289,
59th Cong., 1st sess.). The costs and expenditures prior to the
adoption of the existing project in 1917 were $50,082.49 for new
work and $56,607.51 for maintenance, a total of $106,690. For
further details see page 1530 of Annual Report for 1932.
   Existing project.-This provides for a channel 21 feet deep from
that depth in Detroit River through the " short-cut canal " to Maples
Road, with width of 400 feet at the entrance, tapering to 200 feet in
a distance of 2,000 feet; thence 200 feet wide to Maples Road; and
for a channel 22 feet deep from the mouth of the river for a distance
of about 1,400 feet (1,800 feet from present harbor line), with a
width of 240 feet at the mouth, tapering to 100 feet at a distance
of 800 feet from the mouth; and a channel 17 feet deep and 100 feet
wide from the second bridge to junction with the 21-foot chan-
nel. The length of the improvement from its upper limits to Detroit
River via short-cut canal is about 31/2 miles and via the natural
channel is about 41/ miles.
   The project depths are referred to local low-water datum in the
Detroit River at the mouth of the Rouge River, which is taken at
572.2 feet above mean tide at New York. The level of this river,
except during floods, changes with the level of the Detroit River,
which fluctuates to an average extent of about 1.5 feet during the
navigation season.
   The estimate of cost for new work on the 21-foot channel, revised
in 1920, was $590,000, exclusive of amounts expended on previous
projects. The latest (1928) approved estimate for annual cost of
maintenance is $14,000.
   The existing project was authorized by the following river and
harbor acts: The act of August 11, 1888, provided for the 17-foot
section (Annual Report for 1887, pp. 2275-2278); the act of March
2. 1907, provided for the 22-foot channel at the mouth of the river
 (H. Doc. No. 289, 59th Cong., 1st sess.); and the act of August 8,
1917, provided for the 21-foot channel (H. Doc.No. 2063, 64th Cong.,
2d sess.). The latest published maps are in the project document,
and Rivers and Harbors Committee Document No. 19, Seventy-
second Congress, first session, and Senate Committee Print, Seventy-
third Congress, second session.
   Recommended modificaltions of project.-Under date of April 27,
1934, the Chief of Engineers recommended modification of the exist-
ing project so as to provide a channel 25 feet deep from the mouth of
the old channel upstream for a distance of 1,300 feet, and thence 18
feet deep for a distance of 1,425 feet, with no change in the present
authorized widths; and a channel 21 feet deep extending from the
junction of the old channel and the short-cut canal into the old
channel to the Detroit, Toledo & Ironton Railroad bridge, with a
width of 150 feet, decreasing to 130 feet at the north end of the Peer-
1146     REPORT    OF CHIEF OF ENGINEERS, U.           S. ARMY,    19 3 4


less Portland Cement Co. wharf and to 100 feet at a point 300 feet
north of that point and thence 100 feet wide to the bridge, with
suitable widening at the bend opposite the Detroit Sulphite Pulp
& Paper Co. plant, at a total estimated cost of $258,000 with $12,000
annually for maintenance in addition to that now required; subject to
certain conditions of local cooperation (S. Com. Print, 73d Cong.,
2d sess.).
   Local cooperation.-Complied with.
   Terminal facilities.-There is an iron-ore dock near the river's:
mouth, equipped with unloading machinery. The Ford Motor Co..
has an ore and coal dock near the head of the river improvement,
with the most improved type of unloaders. Two docks fully equip-
ped for handling oil and oil products, also one dock equipped for
handling gypsum rock, have been constructed along the river bank.
These docks have good railroad connections. In addition, there are
5 docks owned by sand and gravel companies which have unloading
machinery and 2 lumber docks. There are also a number of smaller
docks for launches and rowboats. All docks along the river are
privately owned and understood to be restricted to use of the owners.
These terminal facilities are considered adequate for the existing
commerce.
   Operations and results during fiscal year.-Maintenance dredging
by U. S. hopper dredge Meade from August 27 to October 9, 1933,
partially restored project depth but not for full width in the turn-
ing basin, and in the 21- and 17-foot projects. A total of 130,393
cubic yards, bin measurement, was removed. The costs were $23,-
008.50 for maintenance, and the total expenditures were $23,065.50.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1923 at a saving of $28,354 under the estimated cost. The
work consisted in dredging and in construction of five dolphins at
the mouth of the short-cut canal.
   As a result of the dredging, the controlling draft in the 21-foot
project is 21 feet for a minimum width of about 150 feet in the
upper reach, and a minimum depth of about 151/2 feet in the 17-foot
project for a width of 70 feet.
   All bridges have been altered in accordance with the requirements
of law. The turning basin at the head of the improvement has been
completed. The head of navigation is determined by a fixed bridge
about 2,600 feet above the upper end of the improvement.
   The costs have amounted to $561,645.86 for new work and $311,-
865.27 for maintenance, a total of $873,511.13. Also contributed
funds in amount of $20,000 have been applied to the work.
   The total expenditures were $873,511.13.
   Proposed op'erations.-The balance unexpended at the end of the
year ($21,020.71) will be applied about as follows:
Accounts payable, June 30, 1934___----------------------------------   $365
Maintenance: Maintenance channel dredging by United States hop-
  per dredge, November 1934 ------------------------------------ 20, 655. 71

       Total ---------------------------------------------------        21, 020. 71
Rouge River is used by deep-draft ore, stone, coal, and oil carriers.
The importance and volume of traffic using this river requires
               RIVERS AND HARBORS-DETROIT, MICH., DISTRICT                                                       1147
maintenance of full project dimensions.   Shoaling is progressive,
and annual maintenance dredging is required.  The sum of $22,000
can be profitably expended for this purpose during the fiscal year
ending June 30, 1936.

                                  Cost and financial summnary

Cost of new work to June 30, 1934______________________________                                          $611, 728.35
Cost of maintenance to June 30, 1934___ ______--    _____ -                                               368, 472. 78
      Total cost of permanent work to June 30, 1934_______-- -                                           980, 201. 13
Value of plant, materials, etc., on hand June 30, 1934 _____ .__                                              365. 89

      Net total cost to June 30, 1934---------------------------                                         980, 567. 02
Minus accounts payable June 30, 1934--- __-           --
                                                 - _______       -__                                     -    365. 89
     Net total expenditures  ____________________                                                        980, 201. 13
Unexpended balance June 30, 1934-___________    ____________                                              21, 020. 71
         Total amount appropriated to June 30, 1934                                                   , 001, 221. 84
                                                                                                     1__________

         Fiscal year ending June 30               1930             1931            1932           1933           1934

Cost ofnew work-                       -      -i----
                                               -iI-.---       ---- ,---.---------------       -i-,       i-. .          -i,-
Cost of maintenance--.--.---..----.-------     $91, 728. 43    $68, 659. 56    $14, 351. 59   $17, 215. 79     $23, 008. 50

Total expended---------------------------       91, 244. 26     57, 693. 97 25, 506. 49        17,136. 43       23, 065. 50
Allotted        _.....---------------------     61, 000. 00     33, 000. 00 -8, 003. 40        19, 906. 23      40, 129. 01

Balance unexpended July 1, 1933__________ ______________________ $3, 957. 20
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934__________________________ $18, 200. 00
Amount allotted from War Department Appropriation
  Act approved July 14, 1932__________________________   5, 000. 00
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933__________________________                                      17, 000. 00
                                                                                                             40, 200. 00
     Amount to be accounted for       --     --                                             _._____ 44, 157. 20
Deductions on account of revocation of allotment _                                        __________     70. 99
      Net amount to be accounted for                     __     _ _ 44, 086. 21
Gross amount expended---        __________--__________ $25, 865. 04
Less reimbursements collected                              2, 799. 54
                                                                      23, 065. 50
      Balance unexpended June 30, 1934 ____________________           21, 020. 71
Outstanding liabilities June 30, 1934___                                  365. 89
      Balance available June 30, 1934_____________________________ 20, 654. 82
Amount that can be profitably expended in fiscal year ending June
  30, 1936, for maintenance            ------                                                      __        22, 000. 00

                                12. MONROE HARBOR, MICH.

  Location.-The harbor is located on the lower reach of the Raisin
River, and empties into Lake Erie at Monroe, Mich. (See U. S. Lake
Survey Chart No. 3.)
  Existing project.-This provides for a channel 21 feet deep and
300 feet wide in Lake Erie, a distance of about 14,800 feet; thence
  'Exclusive    of available funds.
1148    REPORT   OF CHIEF OF ENGINEERS, U.      S. ARMY,   1934


21 feet deep and 200 feet wide, with necessary additional width at
bends, through the existing canal and in Raisin River, for a distance
of about 9,200 feet; thence 9 feet deep and 100 feet wide to the lower
wharves at Monroe, a distance of about 3,800 feet. The project also
provides for riprapped protecting dikes on each side of the channel
extending lakeward for a distance of about 1,200 feet; for a turning
basin with an area of about 22 acres and depth of 18 feet; and for
the removal of the two existing piers and the rock and timber revet-
ments in the existing canal.
   The project depths are referred to low-water datum for Lake
Erie, which is taken at 570.5 feet above mean tide level at New York.
The level of the river varies with that of Lake Erie, which fluctu-
ates irregularly from year to year, the greatest annual fluctuation
being about 21/4 feet and the least about three-fourths of a foot as
measured by monthly mean levels.
   The estimate of cost for new work, revised in 1930, is $1,145,600,
of which local interests are to contribute $490,500. The latest (1930)
approved estimate for annual cost of maintenance is $35,000.
   The existing project was adopted by the following river and har-
bor acts: The acts of February 24, 1835, modified by the act of June
10, 1872, provided for a 9-foot channel, protected by revetments and
piers (Annual Report for 1872, p. 237); and the act of July 3, 1930,
provided for the 21-foot channel, dikes, and turning basin (Rivers
and Harbors Committee Doc. No. 22, 71st Cong., 2d sess.). The
act also provided for maintenance of a depth of 18 feet and a bottom
width of 80 feet in the existing channel in Lake Erie and up Raisin
River to the vicinity of the existing dock of the Newton Steel Co.,
pending dredging of channel of the dimensions authoried in the
act. The latest published map is in the last-mentioned document.
   Local cooperation.-Act of July 3, 1930, requires local interests
to contribute one-half of the cost of the work, but not to exceed
$500,000, and to furnish, without cost to the United States, per-
petual easement in all lands within 200 feet of the center line of the
channel and all land necessary for the turning basin.
   The War Department Appropriation Act approved July 14, 1932,
modified the above conditions in accordance with the provisions con-
tained in Rivers and Harbors Committee Document No. 12, Seventy-
second Congress, first session, which provides that the execution of the
project may Pe begun when an agency empowered by law to levy and
collect taxes in amount sufficient to meet the required payments has
entered into a formal agreement with the Secretary of War for the
payment of one-half of the principal of the cost of the improvement,
not to exceed $500,000, in annual installments of $50,000, and has
made the first payment; and the lands and easements have been fur-
nished as prescribed under the conditions of adoption of the project.
   Terminal facilities.-At the city of Monroe are some small pri-
vately owned docks. These docks are open to all vessels upon equal
terms. The Newton Steel Co. has constructed a private dock. The
terminal facilities are adequate for the existing commerce.
   Operation and results during fiscal yearNew work.-The work
is divided into two sections with a separate contract for each section.
Section A includes 14,800 feet of the approach channel and 4.740 feet
           RIVERS AND HARBORS-DETROIT,           MICH.,   DISTRICT        1149
of the river channel, and the construction of protecting dikes; sec-
tion B includes the remaining 4,460 feet of the river channel and the
turning basin upstream therefrom. At section A, work was re-
stricted to the river portion and it consisted in the removal 6f trees,
brush, piles, and remnants of old piers preparatory to hydraulic
dredging. No contract payments were made and the contractor has
been declared in default. The work was readvertised and a new
contract made for the completion of this section. At section B, work
has been continued by hydraulic pipeline, dipper, and dragline
dredges, and the work is about 75 percent complete. Material re-
moved during the year, mainly earth, was removed in amount of
983,000 cubic yards.
   Maintenance.-Dredgingby the U. S. hopper dredge Burton was
in progress during April 1934 to restore 16 foot depth at the mouth
of river. Material was removed in amount of 36,300 cubic yards.
   The costs during the fiscal year were $136,230.21 for new work
and $6,807.09 for maintenance, a total of $143,037.30. The total
expenditures were $139,231.11.
   Condition at end of fiscal year.-The existing project is about 20
percent complete. The work remaining to be done is mainly in
section A, and it consists in deepening and widening the channel and
the construction of protecting dikes. The controlling depth from
Lake Erie to a point about 9,000 feet above the mouth of river is 16
feet, thence for 2,000 foot length there is about 9 foot depth, and
thence to Monroe, about 8,000 feet, there is about 6 foot depth, as
shown by surveys of 1921 and 1929.
   The costs have amounted to $324,792.60 for new work and $141,-
366.85 for maintenance, a total of $466,159.45.
   The total expenditures were $452,831.25.
   Proposed operations.-The balance unexpended at the end of the
year, $821,582.21, will be applied about as follows:
Accounts payable June 30, 1934----------------------------          $13, 300. 00
New work: Completion of deepening of present channel from Lake
  Erie to upper end of canal, a distance of 19,540 feet, under con-
  tracts in force; estimated date of completion, June 1935 ------- 08, 282. 21
      Total    -------------------------------------------           821, 582. 21
  Funds in amount of $20,000 can be profitably expended for mainte-
nance dredging by contract or by Government plant during the fiscal
year ending June 30, 1936.
                            Cost and financial summary

Cost of new work to June 30, 1934--------------------------         $324, 792. 60
Cost of maintenance to June 30, 1934------- -----                    141, 366. 85

     Total cost of permanent work to June 30, 1934------------       466, 159.45
Minus accounts payable June 30, 1934-------------------------         13, 328. 20

     Net total expenditures-----------------------------452, 831.25
Unexpended balance June 30, 1934--------------------------771, 582. 21
       Total amount appropriated to June 30, 1934----------        1, 224, 413.46

  'Exclusive   of $50,000 contributed funds.
1150          REPORT OF CHIEF                    OF ENGINEERS, U.                     S. ARMY,          1934


          Fiscal year ending June 30                     1930           1931            1932          1933            1934


Cost of new work               --------------------------------------------                        $23, 922. 98    $136, 230.21
Cost of maintenance----...........----------------$10.            60 $18, 526. 77   $18, 641. 66          4.87        6, 807. 09
       Total cost-------------------------                  10. 60    18, 526. 77    18, 641. 66    23, 927. 85     143, 037. 30
Total expended----------------------                    --- 0. 50        464. 52     24, 955.31     26, 154.44      139, 231.11
Allotted.....-----------------------------              -164. 40      28, 000. 00     9, 755. 00   586, 185. 15     338, 447. 44


Balance unexpended July 1, 1933______--
                                    -------                      $572, 365. 88
Amount allotted from War Department Appropria-
tion Act approved July 14, 1.932----------------$116, 000. 00
Amount allotted from Emergency Relief and Con-
struction Act approved July 21, 1932____________   224, 000. 00
                                                                  340, 000. 00
     Amount to be accounted for_______________          ______                                                961, 365. 88
Deductions on account of revocation of allotment_______________                                                 1, 552. 56

       Net amount to be accounted for ___.    ____-____          -__ 910, 813. 32
Gross amount expended_______--- ---              __--$214, 505. 73
1 ess reimbursements collected____________________     75, 274. 62
                                                                     139, 231 .11

      Balance unexpended June 30, 1934______________       _____                                              771, 582.21
Outstanding liabilities June 30, 1934______________ $13, 328. 20
Amount covered by uncompleted contracts-____         808, 145. 90
                                                                                                              771, 474. 10

          Balance available June 30, 1934______________________                                                       108. 11

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1--------------------------------                                                      20, 000. 00

                                         13. TOLEDO HARBOR, OHIO

   Location.-This harbor comprises the lower 7 miles of Maumee
River and the channel about 9 miles long through Maumee Bay to
Lake Erie. The Maumee River has its source in northern Indiana
and empties into Lake Erie. The fall, velocity of current, and dis-
charge are unknown. The harbor is located at the westerly end of
Lake Erie, 99 miles westerly from Cleveland, Ohio. (See U. S. Lake
Survey Chart No. 3.)
   Previous projects.-Adopted by acts of June 23, 1866, June 14,
1880, July 5, 1884, August 5, 1886, July 1.3, 1892, and August 18, 1894.
The total amount expended and the total cost under these projects
prior to the adoption of the existing project in 1899 was $1,624,695.45
for new work and maintenance (not separable). For further details
see page 1959 of Annual Report for 1915.
   Existing project.-This provides for a channel 400 feet wide and
21 feet deep from deep water in Lake Erie through Maumee Bay
and Maumee River to Fassett Street Bridge, a distance of 15 miles;
thence 200 feet wide and 19 feet deep for a distance of 1 mile, termi-
nating in a turning basin 500 feet wide; and for a stone-revetted
earth dike, 1,000 feet long, to form a foundation for range lights in
    1 Exclusive of available funds.
          RIVERS AND HARBORS-DETROIT,       MICH., DISTRICT      1151

Maumee Bay. The project depths are referred to low-water datum
for Lake Erie, which is taken at 570.5 feet above mean tide level at
New York. Ordinary fluctuations of water level are from 4 feet
above to 2 feet below low-water datum, and extreme fluctuations,
produced by wind and other causes, are from 9 feet above to 6.5
feet below that plane. The estimate of cost for new work, revised
in 1928, is $1,375,000, exclusive of amounts expended on previous
projects. The latest (1926) approved estimate for annual cost of
maintenance is $100,000.
   The existing project was adopted by the following river and harbor
acts: The act of March 3, 1899, provided for the section above Fassett
Street Bridge (H. Doc. No. 198, 55th Cong., 2d sess., and Annual
Report for 1898, p. 2693); and the act of June 25, 1910, provided
for the section below that bridge (H. Doc. No. 865, 60th Cong., 1st
sess.). The latest published map is in Rivers and Harbors Com-
mittee Document No. 21, Seventy-second Congress, first session.
   Supplementing the work authorized by Congress, the deepening of
the entrance channel to a depth of 25 feet for 500 feet width in
Maumee Bay and 400 feet width in the river to the Baltimore &
Ohio Railroad dock with a turning basin 18 feet deep, 8.25 acres in
area, as recommended by the Chief of Engineers in Rivers and Har-
bors Committee Document No. 21, Seventy-second Congress, first
session, has been included in the Public Works program under the
National Industrial Recovery Act.
   Recommended modifications of project.-Included in Public Works
program.
   Local cooperation.-The work included in the Public Works pro-
gram is subject to the condition that disposal areas will be provided
free of cost.
   Terminal facilities.-The city of Toledo has provided a lagoon
near the mouth of the river suitable for the winter mooring of vessels.
Three large railroad terminals for the handling of ore and 4 for
coal are open to shippers of these commodities; 1 fuel dock and
3 docks with elevgtor facilities for handling grain. Three pipe-
line docks for shipment of oil, 1 pipe-line dock for receipt of
gasoline, and 3 fish docks are private. Two package-freight ter-
minals are leased by companies operating regular lines of vessels.
Considerable wharf frontage is owned by railroads, which is available
for the transshipment of miscellaneous cargoes, such as lumber, etc.,
to and from cars. Of 10 sand and gravel docks, 2 are for public use.
Four docks at street ends are owned by the city of Toledo, at which
freight may be loaded or unloaded free of charge, no storage being
allowed. Terminal facilities are regarded as adequate for existing
commerce.
   Operation and results during fscal year---Regular funds.-Main-
tenance: A field office at Toledo was maintained for supervision of
miscellaneous surveys and inspections.
   Publio Works funds.-New work: Contract operations were in
progress for deepening and widening the channel through Maumee
Bay to Lake Erie and for deepening the channel in Maumee River up
to the Baltimore & Ohio Railroad dock with a turning basin oppo-
site that dock. Dredging began in the river section on November 7,
     91536-ENG 1934---73
1152     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 19 3 4

1933, and in the bay section on May 2, 1934. Material was removed
in amount of 741,870 cubic yards, mainly earth.
  The costs during the fiscal year were distributed as follows:
Regular funds: Maintenance: Supervision of harbor----__-__-                 $1,840. 36
Public Works funds: New work:
    Channel deepening and widening---------____                            274, 618.60
    Surveys and inspection__--------------------                            28, 249. 38

       Total--------------------------------------------                   302, 867. 98

       Total all funds________---                _________------_          304, 708. 34
  The total expenditures were $220,295.42.
  Condition at end of fiscal year.-New work in progress with Public
Works funds, for deepening the entire channel and widening the
channel to 500 feet in Maumee Bay, is about 10 percent completed.
Prior work consisted in the excavation of a channel which is still
available, 21 feet deep from Lake Erie to Fassett Street Bridge, com-
pleted in 1915; in the excavation of a channel 19 feet deep, extending
1 mile above the Fassett Street Bridge, completed in 1903; and in the
construction of a dike between the range lights in Maumee Bay, com-
pleted in 1906.
  The controlling depth along the axis of the channel from Lake Erie
to Fassett Street Bridge is about 21 feet for a least width of about 300
feet. For about 3,800 foot length above Fassett Street Bridge, the
controlling depth is about 21 feet for 200 feet width with a turning
basin with 18 foot depth at the upstream end of the improvement.
  The costs have been as follows:
Regular funds:
   New work and maintenance prior to 1903 (not separable) __ $1, 267, 406.
   Maintenance since 1903___1------___---_______                         1,
                                                                 919, 682. 80
                                                                                     91
      Total--  -------        ---------------------------                3, 187, 089. 71
Public Works funds: New work--      -__-_______-__---___                    302, 867. 98

       Total all funds_-------______-______------                        3,489, 957. 69
  The total expenditures were $3,414,411.27, of which $3,180,045.14
were from regular funds and $234,366.13 from Public Works funds.
  Proposed operations.-The balance unexpended, including ac-
counts receivable, at the end of the year ($34,233.30), will be applied
as follows:
Regular funds: Accounts payable, June 30, 1934_---__ -______ $11, 260. 05
Maintenance:
   Supervision of harbor__________---___           -__-__-___ 2, 200.00
   Engineering, surveys, contingencies_----_______   ___:-_ 20, 773.25

       Total        ---------------------------------------------           34, 233.30
  National Industrial Recovery Act funds.-The balance unex-
pended from funds allotted under the National Industrial Recovery
Act ($3,455,633.87) will be applied as follows:
Accounts payable, June 30, 1934_.___..       ________ _      ___-     $68, 501. 85
New work: Completion of deepening and widening present
  channel and providing a turning basin at upper end of river by
  contract in force; estimated date of completion, Dec. 1, 1935.__ 3, 387, 132. 02

       Total---------                            _-__-__--   _--______   3,455, 633. 87
                  RIVERS AND HARBORS-DETROIT, MICH., DISTRICT                                                               1153
  As the existing contract for deeping Toledo Harbor Channel
will not be completed until about December 1935 maintenance dredg-
ing will not be necessary during the fiscal year 1936, but the sum
of $22,000 can be profitably expended for maintenance items of
custody of harbor, engineering, and contingencies during the fiscal
year ending June 30, 1936.
                                           Cost and financial summary
                                  MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934 -----------------------                                                     $2, 892, 102. 36
Cost of maintenance to June 30, 1934                                                                             , 919, 682. 80
                                                                                                               1----------------------

      Total cost of permanent work to June 30, 1934----------                                                    4, 811, 785. 16
Value of plant, materials, etc., on hand June 30, 1934                                     ----------                 -174. 03

      Net total cost to June 30, 1934____________________                                                        4, 811, 611.13
Plus accounts receivable June 30, 1934 ___..            -___-
                                                  -____---                                                            4, 389. 51

     Gross total costs to June 30, 1934 ---__-----------                                                     - 4, 816, 000. 64
Minus accounts payable June 30, 1934__------ -----                                                                 11, 260. 05

     Net total expenditures    ----------------------------                                                      4, 804, 740. 59
Unexpended balance June 30, 1934                                                                                     29, 843.79
          Total amount appropriated to June 30, 1934
                                                  _________                                                      4, 834, 584. 38

           Fiscal year ending June 30                          1930            1931          1932           1933             1934


Cost of new work---------.....................-----------          .....
Cost of maintenance.........----------------                $81, 122. 54 $363, 390. 83    $57, 584. 67   $31, 737. 15       $1,840. 36
Total expended--.-----------......                           63, 394. 85   317, 102. 41   129, 439. 85    32, 678. 41     -14, 070. 71
Allotted----.................                               455,000. 00 --35,000.00        15, 000. 00    63, 986. 31     -16, 667. 90

Balance unexpended July 1, 1933_.----.----------------------                                                           $32, 440. 98
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934---------------------- $5, 000. 00
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933____-_____________     __  23, 000.00
                                                                                                                        28, 000. 00
      Amount to be accounted for___ _____,__                                                                            60, 440.98
Deductions on account of revocation of allotments__------------                                                         44, 667. 90
       Net amount to be accounted for _____________                                            -- ______                15, 773. 08
Gross amount expended-----------------------------                                             $81, 454. 59
Less reimbursements collected------------------------                                            95, 525. 30
                                                                                                                      ---14, 070. 71
      Balance unexpended June 30, 1934_........__                                              ______--                 29, 843. 79
Outstanding liabilities June 30, 1934--- --------- __                                           --
                                                                                             _____          --
                                                                                                           __.          11, 547. 76
     Balance available June 30, 1934--------..-______                                                                   18, 296. 03
Accounts receivable June 30, 1934-----
                                ..     ------....... __                                                          --      4, 389. 51
           Unobligated balance available June 30, 1934__---------------                                                 22, 685. 54
Amount that can be profitably expended in fiscal year ending June
                           1 - - - - - - - -- -- - - - - - -      -
    30, 1936, for maintenance                                                                                           22. 000.00
   1 Exclusive       of available funds.
1154                REPORT                  OF CHIEF OF ENGINEERS, U. S. ARMY,                                                        1934

                                                                  PUBLIC WORKS FUNDS

Cost of new work to June 30, 1934        _____-----------------                                                                          $302, 867.98
Cost of maintenance to June 30, 1934-----------                                                                                          -----------
Total cost of permanent work to June 30, 1934__.
                                              ---------                                                                                      302, 867. 98
Minus accounts payable June 30, 1934------------------------                                                                                  68, 501. 85

      Net total expenditures -------------------       __                                                                                  234, 366. 13
Unexpended balance June 30, 1934------------------------                                                                                3, 455, 633. 87

                Total amount appropriated to June 30, 1934------------                                                                  3, 690, 000. 00


      Fiscal year ending June 30                                  1930                 1931           1932                     1933               1934


Cost of new work-------------.......................-------------------.......----------------------                                            $302, 867. 98
Cost of maintenance-------------.........................---------...........--......................................
          Total expended--                       --------------------------------                     ----------------------                     234, 366. 13

Allotted-----------.....................-----------            -----------------------                  ----        --------------
                                                                                                                          .....    3, 690, 000. 00


Amount allotted from National Industrial Recovery Act, ap-
   proved June 16, 1933--------------------------------               3,690,000.00
Gross amount expended---------------------             $234, 390.13
Less receipts from sales--------- ------------                24. 00
                                                                        234, 366.13

       Balance unexpended June 30, 1934----------__------        3,455, 633.87
Outstanding liabilities June 30, 1934 _._____---   $68, 501. 85
Amount covered by uncompleted contracts-------- 3, 387, 132.02
                                                                 3, 455, 633. 87

                     CONSOLIDATED COST AND FINANCIAL SUMMARY FOR TOLEDO HARBOR

Cost of new work to June 30, 1934---------....                                             -       ----                   -___ $3, 194, 970. 34
Cost of maintenance to June 30, 1934                                                      .- --     ---... --..-.         -.    1, 919, 682. 80
       Total cost of permanent work to June 30, 1934----------5,114, 653. 14
Value of plant, materials, etc., on hand June 30, 1934----------  --174. 03
      Net total cost to June 30, 1934----------------------- 5, 114, 479. 11
Plus accounts receivable June 30, 1934 .-------------------- -    4, 389. 51
       Gross total costs to June 30, 1934_ ...-----.........                                                                         . 5, 118, 868. 62
Minus accounts payable June 30, 1934--------------                                                                                  -_____79, 761. 90
      Net total expenditures---------------------------                                                                                 5, 039, 106. 72
Unexpended balance June 30, 1934------------------------                                                                               3, 485, 477. 66
                Total amount appropriated to June 30, 1934------------                                                                  8,   524, 584. 38

      Fiscal year ending June 30                                   1930                1931            1932                    1933               1934

Cost of new work.-----            ------------------------.---------                                                --------------              $302, 867.98
Cost of maintenance-.............      $81, 122. 54         $363,390.83                             $57, 584. 67          $31, 737.15              1,840. 36
           Total cost----------------................            81, 122. 54         363, 390.83     57,584. 67             31, 737. 15          304, 708.34
Total expended----.................                              63, 394. 85         317, 102. 41   102, 439. 85            32, 678. 41          220, 295. 42
Allotted......................---------------------..          455, 000. 00         -35, 000. 00      15, 000. 00           63, 986. 31             332. 10
                                                                                                                                               3,673,
           RIVERS AND HARBORS-DETROIT,             MICH., DISTRICT               1155
Balance unexpended July 1, 1933----------------------------                $32, 440. 98
Amount allotted from War Department Appropria-
  tion Act approved Apr. 26, 1934-----------------$5, 000. 00
Amount allotted from War Department Appropria-
  tion Act approved Mar. 4, 1933-----------------    23, 000. 00
Amount allotted from National Industrial Recovery
  Act approved June 16, 1933-------------------- 3, 690, 000. 00
                                                                         3, 718, 000. 00

      Amount to be accounted for-------------------------       3, 750, 440. 98
Deductions on account of revocation of allotment---------------     44, 667. 90

      Net amount to be accounted for----------------------         3, 705, 773. 08
Gross amount expended--         -------------------- $315, 844. 72
Less:
      Reimbursements collected -----      $95, 525. 30
      Receipts from sales--------------         24. 00
                                                          95, 549. 30
                                                                           220, 295.42
      Balance unexpended June 30, 1934-      ------------------ 3, 485, 477. 66
Outstanding liabilities June 30, 1934-------------- $80, 049. 61
Amount covered by uncompleted contracts--------3,387, 132.02
                                                                 3, 467, 181. 63

     Balance available June 30, 1934------------------------                18, 296. 03
Accounts receivable June 30, 1934-----------------------------               4, 389. 51

       Unobligated balance available June 30, 1934---------------           22, 685. 54

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance
         30, 936
             fo            1        _________
               maitennce--------------------------------                    22, 000.
                                                                            221, 00. 00
                                                                                     0
  14. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                     (GENERAL)

  The cost of work during the year was $8,940.90; the expenditures
were $17,976.87.
  The balance unexpended, including accounts receivable, at the end
of the year will be applied as needed during the fiscal year ending
June 30, 1935, to payment of expenses incurred in connection with
the above items. The additional sum of $20,000 can be profitably
expended for the same purpose during the fiscal year ending June
30, 1936.
                             Cost and financial summary
Cost of maintenance to June 30, 1934------------------------ $175, 121. 53
Value of plant, materials, etc., on hand June 30, 1934----------   ---
                                                                 7, 049. 26

      Net total cost to June 30, 1934 ------------------------             182, 170. 79
Plus accounts receivable June 30, 1934--------------                            828. 24

     Gross total costs to June 30, 1934----------------------   182, 99. 03
Minus accounts payable June 30, 1934---------------------------      677. 40
     Net total expenditures-------------------------------                 182, 321. 63
Unexpended balance June 30, 1934-- --------------------   -                 17, 643. 32
       Total amount appropriated to June 30, 1934--------------199, 964. 95

  1Exclusive of available funds.
1156         REPORT OF CHIEF OF ENGINEERS,                                       U. S. ARMY,                  1934


          Fiscal year ending June 30                   1930              1931              1932             1933             1934

Cost ofnew work-......                                                                                                  I
Cost of maintenance__-----------. ---.- $22, 827. 97                $83, 740.79         $20, 492. 49    $29, 937. 97        $8, 940. 90
Total expended_.------.--.---.-.-.-----_
              .23,                                      974. 39      76, 069. 63         28, 244. 60      27, 490.87        17, 976. 87
Allotted_       -                                31, 250. 00 65, 000. 00
                                          .----------------------------- 19, 500. 00                      30, 957. 17       29, 757. 78


Balance unexpended July 1, 1933--------------------------------- $5, 862. 41
Amount allotted from War Department Appropriation Act approved
Mar. 4, 1933      ------------------------------------------    38,000. 00
     Amount to be accounted for     ----------------------------                                                        43, 862. 41
Deductions on account of revocation of allotment -----------------                                                       8, 242. 22
      Net amount to be accounted for-----------------------35,                                                              620. 19
Gross amount expended    --------------------------                                               $49, 968. 50
Less reimbursements collected          ----------------------                                      31, 991. 63
                                                                                                                        17, 976.87
      Balance unexpended June 30, 1934----------------------                                                            17,643. 32
Outstanding liabilities June 30, 1934----------------------------                                                          677. 40
     Balance available June 30, 1934-----------------------16,                                                              965.92
Accounts receivable June 30, 1934___                                                                                        828. 24
          Unobligated balance available June 30, 1934--------------                                                     17,794. 16

Amount that can be profitably expended in fiscal year ending -June
                            -   - - - - -- - - - - - - - - - - - - - - - - - - - - - -
30, 1936, for maintenance 1                                                           20, 000. 00
                 15. Other projects for which no estimates are submitted
                     [Commercial statistics for these projects are given in pt. 2 of report]

                                                               For last         Cost and expenditures to                Estimated
                                                               full re-               June 30, 1934                     amount re-
                     Name of project                           port see                                                       re
                                                              annual re-                                                 quired to
                                                               port for         New work          Maintenance            complete

1. Mackinac Harbor, Mich. a-_ _..    -----.     .
                                              ._.__.              1931           $77, 982. 12          $23, 419.02      Completed.
2. Cheboygan Harbor, Mich. a------1931                                           199, 612.05            36,451.54         Do.
3. Port Clinton Harbor, Ohio a------                              1931          b 71, 949. 86           35, 553. 60       Do.

  a Improvements are adequate for existing commerce.
  b Includes maintenance costs prior to 1894.

        Status of reports balled for by river and harbor acts and committee
                                      resolutions


                               Authorization act          Transmitted
                                                          to Congress                   Document
                                                                                        Document No.               Recommenda-
                                                                                                                   Recommenda-
          Locality                                                                                                     tion

Great Lakes-Connect-         Rivers and Harbors .
ing waters, principal         Committee resolu-
harbors, and river            tion, Jan. 5, 1934.
channels.
Monroe Harbor, Mich.-    Rivers and Harbors Sept. 30, 1933               _-------------------- Unfavorable.
                           Committee resolu-
                           tion, Feb. 23, 1933.
Point Lookout, Mich __ River and Harbor Act, July 10, 1933 -----------------------                Do.
SJuly                            3, 1930.
Port Austin     Harbor, .....Do-  ..............  July  8, 1933 -----------------------           Do.
  Mich.
Rouge River, Mich., old  Senate  committee   res- Apr. 27, 1934  --------------------          Favorable.
  channel.                 olution, Nov. 4, 1933.
Saginaw River, Mich___Rivers and Harbors
                           Committee resolu-
                           tion, Apr. 27, 1934.
Sebewaing Harbor and Rivers and Harbors .-------------
   River, Mich.            Committee resolu-
                           tion, Feb. 8, 1934.

      1Exclusive of available funds.
           RIVERS AND HARBORS-BUFFALO,               N.   Y.,   DISTRICT          1157
IMPROVEMENT OF RIVERS AND HARBORS                                       IN THE
           BUFFALO, N. Y., DISTRICT

  This district comprises all of the south shore of Lake Erie from
and including Sandusky Harbor, Ohio, to Buffalo Harbor, N. Y., the
east side of Niagara River, all of the south shore of Lake Ontario
eastward from Niagara River, and the St. Lawrence River as far
east as the international boundary line.
  District Engineer: Lt. Col. M. C. Tyler, Corps of Engineers, to
October 18. 1933; First Lt. T. H. Stanley, Corps of Engineers, since
that date.
  Division Engineer: Col. E. M. Markham, Corps of Engineers to
October 26, 1933; Lt. Col. Max C. Tyler, Corps of Engineers, since
that date.
                                  IMPROVEMENTS

                                   Page                                            Page
1.   Sandusky Harbor, Ohio...     1157       14. Rochester (Charlotte) Har-
2.   Huron Harbor, Ohio-------    1162               bor, N. Y_____________        1216
3.   Lorain Harbor, Ohio-------   1166       15. Pultneyville Harbor, N. Y _       1219
4.   Cleveland Harbor, Ohio ...   1172       16. Great Sodus Bay Harbor,
5.   Fairport Harbor, Ohio--      1178               N. Y_________---              1220
6.   Ashtabula Harbor, Ohio .__   1183       17. Little Sodus Bay Harbor,
7.   Conneaut Harbor, Ohio,       1188               N. Y----_-------------        1223
8. Erie Harbor, Pa-       ---     1194      18. Oswego Harbor, N. Y______         1225
9. Dunkirk Harbor, N. Y------     1197 19. Cape Vincent Harbor, N. Y__            1229

11. Black Rock
                       --.-
10. Buffalo Harbor, N. Y
                  Channel and
                                   1199      20. St. Lawrence River, between
                                                     Ogdensburg, N. Y., and
      Tonawanda         Harbor,                     Lake Ontario__--___-___        1230
      N. Y-----------------        1206      21. Ogdensburg, Harbor, N. Y __       1231
12. Operating and care of Black              22. Examinations, surveys, and
      Rock Canal and Lock and                        contingencies (general) __    1235
      Ferry Street Bridge, Buf-              23. Other projects for which no
      falo, N. Y                   1-------------211 estimates are submitted__     1236
13. Niagara River, N. Y--------    1212

                       1. SANDUSKY HARBOR, OHIO

    Location.-This,harbor is located in the southeasterly portion of
Sandusky Bay, 55 miles westerly from Cleveland, Ohio. (See
U. S. Lake Survey Chart No. 3.)
    Previous projects.-Adopted by River and Harbor Acts of June
11, 1844, June 23, 1866, March 3, 1873, July 5, 1884, August 11, 1888,
and August 18, 1894. The total cost and expenditures were
 $477,149.09 for new work and maintenance (not separable). (For
further details see p. 1960 of Annual Report for 1915.)
    Existing project.-This provides for a channel 400 feet wide and
'21 feet deep from deep water in Lake Erie through Sandusky Bay,
a distance of about 3 miles, to the city water-front docks, thence
along the water front, a channel about 11/2 miles in length, 300 feet
wide, 22 feet deep, ending in a turning basin 550 feet wide, 22 feet
deep; for protecting works consisting of a stone jetty on the easterly
side of the channel extending northeasterly from Cedar Point, a
distance of 6,000 feet, with suitable pierhead; a short stone spur at
Cedar Point; and for the revetment of the slope adjacent to the
channel in the vicinity of the front range light with a brush-and-
stone mattress.
1158   REPORT OF    CHIEF OF    ENGINEERS,   U.   S. ARMY,   1934


   The project depth is referred to low-water datum for Lake Erie,
which is taken at 570.5 feet above mean tide level at New York.
Ordinary fluctuations of water level are from 3 feet above to 0.5
foot below low-water datum, and extreme fluctuations, produced by
wind and other causes, are from 6 feet above to 2.5 feet below that
plane.
   The estimate of cost for new work, revised in 1928, was $2,088,000
 (including $275,000 contributed by local interests), exclusive of
amounts expended on previous projects. The latest (1928) approved
estimate of annual cost of maintenance is $25,000.
   The existing project was adopted by the following river and har-
bor acts: The act of March 3, 1899, provided for the channel-protec-
tion works (H. Doc. No. 362, 55th Cong., 2d sess., and Annual Report
for 1898, p. 2708), and the act of March 2, 1919, provided for the
latest dimensions of the dredged channel and of the east jetty and
pierhead (H. Doc. No. 982, 64th Cong., 1st sess.), and the act of
January 21, 1927, provided for deepening the dock channel to 22
feet (H. Doc. No. 584, 69th Cong., 2d sess.). The latest published
maps are in the last two documents, and in Rivers and Harbors
Committee Document No. 2, Seventy-third Congress, first session.
   Supplementing the work authorized by Congress the enlarge-
ment of the turning basin at the westerly end of the dock channel
by (a) extending the dredged area 250 feet northerly to obtain a
total width of 800 feet; (b) extending the basin, as widened, 200
feet westward; (c) expanding the widened basin a sufficient distance
in an easterly direction to obtain a total length of 950 feet along
the northern boundary and 1,150 feet along the southern, thence
converging to the present channel width (300 feet) in a distance
of 550 feet on the northern side and 450 feet on the southern, and
constructing a dike with the excavated rock on the north side
of the channel and basin, all at an estimated cost of $407,500,
with $3,000 annually for maintenance in addition to that now re-
quired for the adopted project, all as recommended by the Chief
of Engineers in Rivers and Harbors Committee Document No. 2,
Seventy-third Congress, first session, has been included in the Pub-
lic Works program under the National Industrial Recovery Act.
   Recommended mnodifications of project.-Included in Public Works
program.
   Local cooperation.-Fully complied with.
   Terminal facilities.-The city of Sandusky has constructed two
municipal wharves, which are leased to private interests to operate
a coal terminal thereon, which terminal is open to shippers of coal,
and handles about 99 percent of all the tonnage shipped by water
from this harbor, or 90 percent of the total receipts and shipments.
Two other terminals with warehouses are used by regular vessel lines
carrying passengers and miscellaneous freight, open to the public.
Two fuel docks, privately owned, do a public business. One dock for
stone, 1 for stone and sand, 4 for sand, 5 for fish, and 1 for lumber are
private. Three private docks, of which two are on Cedar Point,
handle passengers and merchandise in connection with the summer
resort in that locality. The city of Sandusky owns docks at two
street ends which can accommodate small boats, and one dock near
          RIVERS AND HARBORS-BUFFALO,          N.    Y.   DISTRICT       1159
the foot of Jackson Street, all open to the public. The facilities are
regarded as adequate for the needs of existing commerce.
   Operations and results during fiscal year.-The U. S. hopper
dredge Burton restored the project depth in the straight and outer
bar channels at a cost for maintenance of $3,282.45. The expendi-
ture was $3,893.55, all from regular funds.
   Operations conducted under allotment from the Public Works
Administration consisted of soundings and probings for enlargement
of the turning basin taken at a cost of $14,509.17, for new work.
The expenditure was $14,402.90.
   Condition, at end of fiscal year.-The existing project was com-
pleted in 1930. A channel of the existing project width, length,
and depth was completed in the outer bar and straight channels in
1925 and in the dock channel in 1930. The east jetty from Cedar
Point, 5,940 feet long, with a pierhead 60 feet long at its outer end,
was completed in 1921. The short spur dike at Cedar Point and
the revetment of channel slope near the front range light were com-
pleted in 1901. The protecting works are generally in good condi-
tion. The jetty requires repairs where settlement has taken place.
The controlling depth in the outer bar and straight channel is 21
feet and in the dock channel 21 feet. The total cost of the existing
project to the end of the fiscal year was $2,440,562.32, of which
$1,997,758.21 was for new work and $442,804.11 for maintenance.
The total expenditure was $2,440,562.32. In addition, $325,000 was
expended from contributed funds for new work.
   The work authorized by the Public Works Administration is 3
percent completed. Precontract work is completed, and contract
has been let. No work has been done under this contract. The en-
largement of the turning basin and construction of a dike along the
north edge of the dock channel remains to be done to complete the
work authorized. The total cost to the end of the fiscal year was
$14,509.17 for new work. The expenditure was $14,402.90.
   Total cost of the improvement, United States funds, was $2,455,-
071.49, of which $2,012,267.38 was for new work and $442,804.11 for
maintenance. The total expenditure was $2,454,965.22.
   Proposed operations.-The balance unexpended at the end of the
year will be applied as follows:
Regular funds, maintenance:
   Dredging the east and west dock channel by contract August-
      November 1934 ------ ______-----   ______--______    __  $79, 500. 00
   Dredging by U. S. hopper dredge Taylor August 1934________   11, 701.09

      Total regular funds_-----..____-_____-_--__-          __       91, 201. 09
  The balance unexpended of allotment from the National Industrial
Recovery Act, $393,097.10, will be applied to completion of enlarge-
ment of the turning basin at the westerly end of the dock channel
by contract in force July 1934 to November 1935.
  Redredging is required annually in the straight and outer bar
channels. For this maintenance work $18,500 can be profitably ex-
pended during the fiscal year 1936 for dredging by U. S. hopper
dredge Burton.
1160           REPORT OF CHIEF OF ENGINEERS,                                                     U. S. ARMY, 1934

                                                Cost and financial summary

                                      MAINTENANCE AND IMPROVEMENT FUNDS


Cost of new work to June 30, 1934__ ----------------------- $2, 474, 907. 30
Cost of maintenance to June 30, 1934----______ ______ __        442, 804. 11

           Total cost of permanent work to June 30, 1934_.__                                                                 2, 917, 711. 41

Net total expenditures_______________________-_                                                                              2, 917, 711.41
Unexpended balance June 30, 1934                                                                                                 91, 201.09

           Total amount appropriated to June 30, 1934                                                   -----------          3, 008, 912. 50

    Fiscal year ending June 30                          1930                  1931                     1932           1933             1934


Cost of new work----.....--------......            $572, 140. 77             $2, 603. 08 ---------------------------------
Cost of maintenance------------..                    21, 402. 72             11, 012. 73      $13, 685. 94          $24, 558.82        $3, 282. 45

        Total cost-----------------                  593, 543.49             13, 615. 81          13, 685. 94        24, 558.82         3, 282. 45

Total expended----------------                       563, 594. 10            75, 759. 29          11, 956. 37        26, 103. 57        3, 893. 55

Allotted ---------------------                       204, 000. 00            15, 000. 00        -15,     000. 00     26, 547. 08       90, 000. 00


Balance unexpended July 1, 1933----------------------------$5, 094. 64
Amount allotted from War Department Appropria-
  tion Act approved Apr. 26, 1934____________      $18, 700. 00
Amount allotted from War Department Appropria-
  tion Act approved July 14, 1932------------------46, 800. 00
Amount allotted from War Department Appropria-
  tion Act approved Mar. 4, 1933-----------   __    24, 500. 00
                                                                90, 000. 00

      Amount to be accounted for -------------------------- 95, 094. 64
Gross amount expended ------------------------------------ 3, 893. 55
           Balance unexpended June 30, 1934----                                                    _____------                      91, 201. 09
Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 2____________
                                                    -
                                                           __- __                                                                   18, 500. 00
                                                        PUBLIO WORKS FUNDS

Cost of new work to June 30, 1934                                                 ------------------------- $14, 509. 17
Cost of maintenance to June 30, 1934

Total cost of permanent work to June 30, 1934_______-----_____                                                                      14, 509. 17
Minus accounts payable June 30, 1934 _..__.- -__----_____--                                                                             106. 27

     Net total expenditures         _
                                ---------------------------                                                                         14, 402. 90
Unexpended balance June 30, 1934______-____________-_                                                                              393, 097. 10

           Total amount appropriated to June 30. 1934_._____-___                                                                   407, 500. 00

           Fiscal year ending June 30                                 1930               1931                 1932       1933           1934


Cost of new work----...-------------- ----------------------------------------- $14, 509.17
Cost of maintenance ..  -----
Total expended          .....-------------------------------------------------------------                                             14, 402. 90
Allotted----------          -----------------------------                                        ------------         ----------- 407, 500. 00

    1In addition $325,000 was expended for new work from contributed funds.
    2Exclusive of available funds.
                   RIVERS AND HARBORS--BUFFALO,                                   N. Y., DISTRICT                      1161
Amount allotted from National Industrial Recovery Act ap-
proved June 16, 1933________________-------------------         $407, 500. 00
Gross amount expended       _________-
                                 --                      ___ __-   14, 402. 90

      Balance unexpended June 30, 1934 __________-----_                                                          393, 097. 10
Outstanding liabilities June 30, 1934___-----------     $27. 72
Amount covered by uncompleted contracts -------- 393,000.00
                                                                                                                 393, 027. 72

           Balance available June 30, 1934___                             ___-------------                             69.38

Amount (estimated) required to be appropriated -for         comple-
                                               -- -- - - -- -- -- -- -
tion of Public Works Administration project 2                                                                   192, 000. 00

        CONSOLIDATED COST AND FINANCIAL SUMMARY FOR SANDUSKY HARBOR, OHIO

Cost of new work to June 30, 1934 -----------------------                                                  $2, 489, 416. 47
Cost of maintenance to June 30, 1934 ----.---------------                                                  - 442, 804. 11

     Total cost of permanent work to June 30, 1934----__----                                                2, 932, 220.58
Minus accounts payable June 30, 1934_..__.      _____     __--                                                      106. 27

     Net total expenditures--_ __--_-----------                                                             2, 932, 114. 31
Unexpended balance June 30. 1934-____________------------                                                      484, 298. 19

           Total amount appropriated to June 30, 1934                                ----------             3, 416, 412. 50

      Fiscal year ending June 30                   1930          1931              1932             1933              1934

Cost of new work.......__.......                $572, 140. 77   $2, 603. 08 .........---          .$14,
                                                                                                .----------               509. 17
Cost of maintenance......----------               21, 402. 72   11, 012. 73      $13, 685. 94     $24, 558. 82         3, 282. 45

        Total cost.............--------------    593, 543. 49   13, 615. 81       13, 685. 94      24, 558. 82        17, 791. 6
Total expended.---.---.------.                   563, 594. 10   75, 759. 29       11, 956. 37      26, 103. 57        18, 296. 45
Allotted                                    204, 400. 00
                                 .---------------------         15, 000. 00    -15, 000. 00        26, 547. 08       497, 500. 00


Balance unexpended July 1, 1933-         ------       _____---______                                  ___         $5, 094. 64
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1.934--------------------- $18,                                          700. 00
Amount allotted from War Department Appropriation
  Act approved July 14, 1932-------__-          _            -____46,                            800. 00
Amount alloted from War Department Appropriation
  Act approved Mar. 4, 1933_-- -----------                      -___24,                          500. 00
Amount allotted from National Industrial Recovery
  Act approved June 16, 1933_ ------               ___
                                                ----.              407,                          500.00
                                                                                                                 497, 500. 00
      Amount to be accounted for_--------______-_________                                                        5021, 594. 64
Gross amount expended--- -----     --------------- ______                                                         18, 296.45
      Balance unexpended June 30, 1934 _,.___      ____________                                                  484, 298. 19
Outstanding liabilities June 30, 1934 ___- -______-____ $27. 72
Amount covered by uncompleted contracts __--       _ 393, 00,0. 00
                                                                                                                 393, 027. 72
           Balance available June 30, 1934_______                                                                 91, 270. 47
Amount (estimated) required to be appropriated for completion of
Public Works Administration project 2______________
                                              --          ___                                                    192, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1936, for maintenance 2__   _     ___________        _                                                  18, 500. 00

  1 In addition $325,000 was expended for new work from contributed funds.
  2
   Exclusive of available funds.
1162       REPORT OF CHIEF OF ENGINEERS,    U.   S.   ARMY,   1934

                       2. HURON HARBOR, OHIO

  Location.-On the south shore of Lake Erie at the mouth of the
Huron River, 47 miles westerly from Cleveland, Ohio. (See U. S.
Lake Survey Chart No. 3.)
  Previous projects.-Adopted by river and harbor acts of May 20,
1826, and September 19, 1890. The total cost and expenditures were
$269,789.07. For further details see page 1961 of Annual Report for
1915.
  Existing project.-This provides for a pier of timber cribs with
concrete superstructure on the west side of the entrance channel
1,970 feet long and for a rubble-mound breakwater on the east side
1,750 feet long with an entrance 300 feet wide between pierheads;
for the removal of the old east pier; for widening the river from the
lower slip of the Wheeling & Lake Erie Railroad to its mouth to a
least width of 200 feet; for constructing a new spur pier on the east
side of the widened channel; for dredging a channel of approach 300
feet wide and 19 feet deep; and for dredging the area of about 14
acres sheltered by the west pier and east breakwater to a depth of
19 feet.
   The project depth is referred to low-water datum for Lake Erie,
which is taken at 570.5 feet above mean tide level at New York.
Ordinary fluctuations of water level are from 3 feet above to 0.5 foot
below low-water datum, and extreme fluctuations, produced by wind
and other causes, are from 5.5 feet above to 2.5 feet below that plane.
  The estimate of cost of new work, revised in 1928, is $325,000, ex-
clusive of amount expended on previous projects. The latest (1928)
approved estimate for annual cost of maintenance is $9,000.
  The existing project was adopted by the following river and har-
bor acts: The act of March 3, 1905, provided for the west pier, east
breakwater, channel of approach, and dredging the sheltered area
 (H. Doc.No. 122, 58th Cong., 2d sess.) ; and the act of March 2, 1919,
provided for the removal of the old east pier, construction of new
spur pier, and the river widening and enlargement of the sheltered
area (H. Doc. No. 5, 63d Cong., 1st sess.). The latest published map
is in House Document No. 478, Seventy-second Congress, second
Session.
  Supplementing the work authorized by Congress the extension of
the west pier, 1,200 feet lakeward, with pierhead at its outer end;
extension of the shore protection at the inner end of the west pier,
200 feet westward; removal of the outer end of the east breakwater
and construction of new pierhead thereon; enlarging and deepening
to 19 feet the west turning basin inside the mouth of the river; and
widening the channel inward from the outer pierhead to the present
project depth of 19 feet, as recommended by the Chief of Engineers
in House Document No. 478, Seventy-second Congress, second session,
have been included in the Public Works program under the National
Industrial Recovery Act.
  Recommended modifications of project.-Under date of October
10, 1932, the Chief of Engineers recommended modification of the
existing project so as to provide for a channel with a depth of 25
feet in soft material and 26 feet in hard material from deep water
in the lake to the south side of the Wheeling & Lake Erie Railroad
Co. slip no. 1 at the entrance to the river, the channel to be 400 feet
          RIVERS AND HIARBORS-BUFFALO,        N.   Y.1 DISTRICT    1163
wide in the lake and 300 feet wide inward from the outer pierhead,
narrowing to 250 feet at the head of the channel; for enlarging and
deepening to 19 feet the west turning basin inside the mouth of the
river; for extending the west pier, 1,200 feet lakeward, with a pier-
head at its outer end; for the removal of the outer end of the east
breakwater and construction of a new pierhead thereon; for extend-
ing the shore protection at the inner end of the west pier 200 feet
westward; and for eliminating from the project the spur pier now
authorized on the east side of the river entrance; and eliminating
also the dredging of the sheltered area outside the channel in the
outer harbor; at an estimated cost of $666,500, but at an estimated
net increase in the total cost of the project of $574,200, with an
annual maintenance estimated at $3,500 in addition to that now re-
quired; subject to certain conditions of local cooperation. (H. Doc.
No. 478, 72d Cong., 2d sess.) Partially included in the Public
Works program.
   Elimination of the proposed spur pier was also recommended in
House Document No. 467, Sixty-ninth Congress, first session.
   Local cooperation.-The work included in the Public Works pro-
gram is subject to the condition that the widening of the channel
and enlargement of the turning basin shall not be undertaken until
local interests furnish free of cost to the United States all necessary
rights of way, agree to maintain the enlarged basin after comple-
tion, and agree to bulkhead the east bank of the river between its
mouth and the north side of slip no. 1, or release the United States
from any claims incident to dredging in widening the river. The
above requirements were complied with March 23, 1934. Prior con-
ditions fully complied with.
   Terminal facilities.-The Wheeling & Lake Erie Railroad Co. has
deepened and maintained the channel above the limits of the Fed-
eral improvement. This company has a dock with a frontage of
over 1 mile, which affords facilities for handling iron ore, coal, sand,
and limestone, together with dock space for lumber, etc. Two fish
docks are private. The facilities are regarded as adequate for the
needs of existing commerce.
   Operations and results during fiscal year.-The U. S. hopper
dredge Burton restored the project depth in the entrance channel
at a cost for maintenance of $5,970.02. The expenditure was
$5,971.37, all from regular funds.
   Under authority of the Public Works Administration, 200 linear
feet of sheet pile shore protection, west of the west jetty, was com-
pleted. Cost $8,235.64. Enlarging the turning basin, widening the
river at its mouth and extension of the west jetty were begun by
contract in June 1934 and were in progress at the end of the fiscal
year. Cost $4,933.24. The total cost for the fiscal year from Public
Works funds was $13,168.88, and expenditure $10,384.08.
   Condition at end of fiscal year.-The project is 71 percent com-
pleted. Dredging for enlargement of the sheltered area and the
construction of new spur pier on the east side of the widened chan-
nel remains to be done to complete the project. The easterly rubble-
mound jetty and the west jetty were completed in 1908, except the
extension of west jetty to shore, in order to close the breach provided
for in the River and Harbor Act of March 2, 1919, which was done
as a necessary maintenance measure in 1914 subsequent to submitting
1164    REPORT    OF CHIEF OF ENGINEERS,              U.   S.   ARMY,   1934


the recommendation to Congress. Dredging, except the enlarge-
ment of the sheltered area, was completed in 1920. The old east
pier was removed in 1919. The superstructure on 1,190 feet of the
west jetty was renewed with concrete in 1925. The outer concrete
section of west jetty and the west pierhead showed considerable
settlement, which was checked in 1915 by repairs then made, and
the pierhead further protected by riprap placed in 1922. The harbor
works are generally in good condition. The protection to the shore
end of the west jetty was repaired and extended in 1929. The
sheltered area has not been maintained and has shoaled to from 4 to
18 feet, except in the channel. The controlling depth in the channel is
19 feet, low-water datum.
   The total cost of existing project to the end of the fiscal year was
$523,767.67, of which $232,659.08 was for new work and $291,108.59
for maintenance. The total expenditure was $523,767.67
   The work authorized by the Public Works Administration is
about 2 percent completed. The 200 feet of sheet pile shore pro-
tection west of the inner end of the west jetty is completed and work
is in progress by contract on enlarging the turning basin in the
Huron River. Completion of the turning basin, widening the river
at its mouth, removal of 300 feet of the outer end of the east jetty,
extending the west jetty 1,200 feet lakeward, and deepening the
channel to 25 feet in soft material and 26 feet in hard material re-
mains to be done to complete the work authorized. All of this work
except deepening the channel was under contract at the end of the
fiscal year. The total cost of this new work to the end of the fiscal
year was $13,168.88. The total expenditure was $10,384.08.
   The total cost of the improvement, all funds, was $536,936.55, of
which $245,827.96 was for new work and $291,108.59 for maintenance.
The total expenditure was $534,151.75.
   Proposed operations.-The balance unexpended at the end of the
year will be applied to maintenance dredging by U. S. hopper
dredges Burton and Taylor during August 1934 and April 1935.
   The balance unexpended of allotment from the National Industrial
Recovery Act, $499,115.92 will be applied to completion of the ex-
tension of the west pier 1,200 feet lakeward; removal of 300 feet
of the outer end of the east breakwater; widening the river entrance;
and enlarging the turning basin by contract in force July 1934 to
November 1935.
   Redredging is required annually. The sum of $7,300 can be profit-
ably expended during the fiscal year 1936 in maintenance dredging
by U. S. hopper dredge Burton.
                         Cost and financial sum/mary
                    MAINTENANCE AND IMPROVEMENT FUNDS


Cost of new work to June 30, 1934--------------------- ---  $502, 448. 15
Cost of maintenance to June 30, 1934-----------------------291, 108.59

       Total cost of permanent work to June 30, 1934----------             793, 556. 74
Net total expenditures------       ---------------------                   793, 556. 74
Unexpended balance June 30, 1934.-------------------                           10, 328. 63
       Total amount appropriated to June 30, 1934 -------------            803, 885. 37
                        RIVERS AND HARBORS-BUFFALO,                                      N. Y., DISTRICT                            1165

           Fiscal year ending June 30                         1930           1931                 1932            1933              1934


Cost of new work-__------------ -------
Cost of maintenance...              ..------------------   $10, 075. 59    $5, 445. 93       $12, 485. 77       $4, 753. 29        $5, 970. 02

Total expended                                      9, 988. 65
                                  .-----------------------                  5, 506. 37          8, 945. 61       8, 318. 60         5, 971. 37
Allotted            -       .          __----------------------------
                                                           13, 000. 00     18, 300. 00        ..........            -3. 50         10, 615. 16


Balance unexpended July 1, 1933__-                                $5, 684. 84
Amount allotted from War Department Appropriation Act
  approved Apr. 26, 1934------------------------- $8, 200.00
Amount allotted from War Department Appropriation Act
  approved Mar. 4, 1933   ---------------------------- 2, 415. 16
                                                                  10, 615. 16

  0   Amount to be accounted for- -             ----------------------                                                        16, 300. 00
Gross amount expended ----------------------------------                                                                       5, 971. 37

            Balance unexpended June 30, 1934 .---.                                       .        ___--------       -         10, 328.63

Amount that can be profitably expended in fiscal year ending June                         30,
                                                                                   -- - - -- -
1936, for maintenance 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - -                                              7, 300. 00

                                                   PUBLIC WORKS FUNDS

Cost of new work to June 30, 1934--------------                                                 -------------             $13, 168. 88
Cost of maintenance to June 30, 1934...................-                                                                  ---------
      Total cost of permanent work to June 30, 1934-------------.                                                             13, 168. 88
Minus accounts payable June 30, 1934-------------------------                                                                  2, 784. 80

      Net total expenditures-------                                       ----------------------                           10, 384. 08
Unexpended balance June 30, 1934___                                                                                       499, 115. 92

            Total amount appropriated to June 30, 1934 .......--------------                                              509, 500. 00

           Fiscal year ending June 30                         1930           1931                 1932            1933              1934


Cost of new work........------------....-----------------------------------------------............                              $13, 168. 88
Cost of maintenance-------........----      ----------         ---                               --------                     ------------

Total expended--------------                             -----
                                                         ,-------
                                              ---------------     -,-----------------------
                                                                      --                                                           10,384.08
Allotted .....---               --------------------------------------------------------                                          509, 500. 00


Amount allotted from National Industrial Recovery Act approved
  June 16, 1933--------------------------------------                                                                    $509, 500. 00
Gross amount expended----------- ----------------------                                                                    10, 384. 08
                                                  .........-
     Balance unexpended June 30, 1934 .-- __ -------                                                                      499, 115. 92
Amount covered by uncompleted contracts-- ----        --------                                                            498, 207. 92

           Balance available June 30, 1934 --.----------------                                                                  - 908. 00

Amount (estimated) required to be appropriated for completion
of Public Works Administration project _________       ___                                                               195, 000. 00

   1 Exclusive of available funds.
1166           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                              1934

       CONSOLIDATED              COST AND FINANCIAL             SUMMARY FOR HURON                 HARBOR,         OHIO

Cost of new work to June 30, 1934_.....___________    ___                                                   $515, 617. 03
Cost of maintenance to June 30, 1934--_______..___________                                                   291, 108.59
      Total cost of permanent work to June 30, 1934------------                                              806, 725. 62
Minus accounts payable June 30, 1934_.-                              ___.______________                        2, 784. 80
     Net total expenditures--___- --------                                         ___---__   _-             803, 940. 82
Unexpended balance June 30, 1934________                                           ___      ___              509, 444. 55
           Total amount appropriated to June 30, 1934 __----____                                           1, 313, 385. 37

          Fiscal year ending June 30                     1930          1931           1932          1933             1934

Cost of new work----.------- ---------                    -$13,                                                          168.88
Cost of maintenance-........--           ..---------.....------
                                                       $10,075. 59   $5, 445. 93 $12,485. 77      $4, 753. 29        5, 970. 02
       Total cost----------- ----------------          10, 075. 59    5,445. 93     12, 485. 77    4, 753. 29       19, 138. 90
Total expended-            ----------------------      9, 988. 65     5, 506. 37    .8,945. 61     8,318. 60        16, 355. 45
Allotted--.........----------------------- --------    13, 000. 00   18, 300. 00 ------------        -3.    50     520, 115. 16


Balance unexpended July 1, 1933____________                                                                      $5, 684. 84
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934____-- -__ -    ____ -  $8, 200. 00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933_____________________     2, 415. 16
Amount allotted from National Industrial Recovery
Act approved June 16, 1933___________
                               -______            509, 500.00
                                                                                                             520, 115. 16
      Amount to be accounted for__.------- __ - - ----                                                     -__525, 800. 00
Gross amount expended ___________-______-__-                                                                   16, 355. 45
     Balance unexpended June 30, 1934--------------------                                                    509, 444.55
Amount covered by uncompleted contracts----                                                                  498, 207.92

           Balance available June 30, 1934___ ---------                                             __-          11, 236. 63

Amount (estimated) required to be appropriated    for completion of
                                      - - - -- -- - - - - - - - - - - - - --
Public Works Administration project                                         195,000. 00

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance --------------------------------                                                       7,300. 00

                                       3. LORAIN HARBOR, OHIO

  Location.-On the south shore of Lake Erie at the mouth of the
Black River, 28 miles westerly from Cleveland, Ohio. (See U. S.
Lake Survey Chart No. 3.)
  Previous projects.-Adopted by River and Harbor Act of May 23,
1828. The total cost and expenditures were $292,202.88 for new work
and maintenance (not separable).     (For further details see page
1961 of Annual Report for 1915.)
  Existing project.--This provides for an outer harbor about 60
acres in area formed by converging rubble-mound breakwaters with
an aggregate length of 6,350 feet and having an entrance 500 feet
wide between pierheads of timber cribs with concrete superstructure
   1Exclusive of available funds.
         RIVERS AND HARBORS--BUFFALO,        N.   Y., DISTRICT    1167
located at the outer ends of the breakwaters; for 2 piers at the mouth
of the river 300 feet apart, the west pier of timber cribs with concrete
superstructure 1,003 feet long, and the east pier 1,875 feet long, of
which 1,763 feet is of timber cribs with concrete superstructure and
112 feet is of sheet pile and rubble-mound construction; and for
dredging the outer harbor and channel 250 feet wide and 20 feet
deep, with suitable widening at the bend, between the piers and
upstream to the American Shipbuilding Co.'s Dry Dock No. 2, a
length of about 4,900 feet.
   The project depth is referred to low-water datum for Lake Erie,
which is taken at 570.5 feet above mean-tide level at New York:
Ordinary fluctuations of water level are from 3 feet above to 0.5 foot
below low-water datum, and extreme fluctuations, produced by wind
and other causes, are from 5 feet above to 2 feet below that plane.
    The estimate of cost for new work, revised in 1930, was $1,023,000,
exclusive of amounts expended on previous projects. The latest
 (1930) approved estimate for annual cost of maintenance is $10,000.
    The existing project was adopted by the following river and
harbor acts: The act of March 3, 1899, provided for the present
dimensions of the entrance piers (H. Doc. No. 131, 55th Cong., 2d
sess., and Annual Report for 1898, p. 2718) ; the act of March 2, 1907,
provided for widening Black River from the inner end of the east-
erly Government pier to Erie Avenue Bridge (no printed report);
the act of August 8, 1917, provided for the present dimensions of the
breakwater (H. Doc. No. 980, 64th Cong., 1st sess.), and for deepen-
ing the outer harbor and channel between piers to the Erie Avenue
Bridge (H. Doc. No. 985, 64th Cong., 1st sess.), and the act of July
3, 1930, provided for extending the 20-foot channel to the American
Shipbuilding Co.'s Dry Dock No. 2 (H. Doc. No. 587, 69th Cong.,
2d sess.). The latest published map is in House Document No. 469,
Seventy-second Congress, second session.
    Supplementing the work authorized by Congress, the deepening
of the outer harbor channel to the American Shipbuilding Dry Dock
No. 2, to 25 and 26 feet; widening of 2 bends above the limits of the
Federal project to a depth of 20 feet, and of the turning basin at
the National Tube Co.'s dock to 17 feet, all as recommended by the
Chief of Engineers in House Document No. 469, Seventy-second Con-
gress, second session, has been included in the Public Works program
under the National Industrial Recovery Act.
    There was also included in the Public Works program maintenance
dredging in the channel in Black River from the upper end of the
Federal project to the upper end of the National Tube Co.'s dock.
   Recommended modifications of project.--Under date of June 8,
1934, the Chief of Engineers recommended the further improvement
of Lorain Harbor to the extent of providing an entrance channel 16
feet deep to the municipal pier in the outer harbor at an estimated
cost of $53,200, with $1,000 annually for maintenance in addition to
that now required, subject to certain conditions of local cooperation.
Prior recommendations contained in House Document Number 469,
Seventy-second Congress, second session, have been included in the
Public Works program.
     91536--N   1934-74
1168   REPORT   OF CHIEF OF ENGINEERS,      U.   S. ARMY,   1934


   Local cooperation.-The work included in the Public Works pro-
gram is subject to the condition that (a) local interests provide with-
out cost to the United States all rights-of-way and easements
required for widening the bends and turning basin and provide dis-
posal areas and agree to maintain these improvements after comple-
tion; (b) that deepening the outer harbor and the channel upstream
to the American Shipbuilding Co.'s Dry Dock No. 2 shall not be
undertaken until local interests furnish assurances satisfactory to the
Secretary of War that they will provide and maintain the same
depth in the channel in Black River from the upper end of the Fed-
eral project to the upper end of the National Tube Co.'s dock. All
prior requirements and requirement (a) above have been fully com-
plied with. Part (b) above has not been complied with.
   Terminal facilities.-One iron ore and one coal terminal are owned
by the Baltimore & Ohio Railroad Co., together with dock space for
storage of sand, transshipment of lumber, etc., to or from cars, which
are open to the public. Extensive docks of the National Tube Co.
handle iron ore, limestone, and sand, and are not open to the public.
One dock for sand and two fish docks are privately owned. The
American Shipbuilding Co. has dry docks and facilities for build-
ing and repairing the largest lake vessels. The city of Lorain owns
a public dock without rail connections which is open to the public.
Terminal facilities at Lorain Harbor are regarded as adequate for
the needs of existing commerce.
   Operations and results during fiscal year.--Regular funds.-The
U. S. hopper dredge Taylor restored the project depth in the outer
harbor and entrance channel. Cost, $7,512.24. Government plant
and hired labor made minor repairs to the breakwaters. Cost,
$9,993.60.
   The total cost of maintenance for the fiscal year was $17,505.84,
and the expenditure was $17,866.35.
   Work authorized by the Federal Emergency Administration of
Public Works: Maintenance dredging for the city of Lorain to
secure a channel 20 feet deep in the Black River from the present
project limits to the turning basin at the National Tube Co. by the
U. S. hopper dredge Burton was in progress. Cost, $21,879.98.
   The rectification of the second bend above the Nickel Plate Bridge
has been completed and rectification of the first bend above the bridge
is in progress by contract and is about 63 percent completed. Cost,
$88,391.45.
   The total cost for the fiscal year was $110,271.43, of which $88,-
391.45 was for new work and $21,879.98 was for maintenance dredg-
ing for the city of Lorain. The total expenditure was $84,875.62.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1933 at a saving of $4,682 under the estimated cost. The
harbor has been improved by the construction of parallel piers at the
mouth of the Black River and by dredging a channel 20 feet deep,
with a least width of 250 feet, in the river up to the American Ship-
building Co.'s Dry Dock No. 2. An outer harbor about 60 acres in
area has been provided by constructing breakwaters and by dredging
to a depth of 20 feet. The piers were completed in 1908; the break-
waters, including pierheads, in 1915, except extension of west break-
           RIVERS AND HARBORS-BUFFALO,                       N.   Y.,   DISTRICT        1169

water to shore, which was completed in 1921. At the end of the
fiscal year the harbor works were generally in good condition.
   The controlling depth in the outer harbor and the entrance channel
tp to the American Shipbuilding Co.'s Dry Dock No. 2 is 20 feet at
low-water datum.
   The total cost of the existing project to the end of the fiscal year
was $1,247,477.54, of which $1,018,318.33 was for new work and
$229,159.21 for maintenance. The total expenditure was $1,247,-
477.54. In addition $3,000 was expended from contributed funds for
new work.
   The work authorized by the Public Works Administration is about
13 percent completed. Rectification of the bends and maintenance
dredging in the river for the city of Lorain was in progress at the
end of the year. The work remaining to be done is completion of the
rectification of the first bend above the Nickel Plate Bridge, enlarg-
ing the turning basin at the National Tube Co. docks, and deepening
the outer harbor and channel up to the American Shipbuilding Co.'s
Dry Dock No. 2 to a depth of 25 feet in soft material and 26 feet
in hard material. All work except deepening to 25 feet was in
progress or under contract at the end of the fiscal year. The total
cost of this work to the end of the fiscal year was $110,271.43, of
which $88,391.45 was for new work and $21,879.98 was for mainte-
nance. The total expenditure was $84,875.62.
    The total cost of the improvement, United States funds, was
 $1,357,748.97, of which $1,106,709.78 was for new work and $251,039.19
for maintenance. The expenditure was $1,332,353.16.
    Proposed operations.-The balance unexpended at the end of the
year will be applied as follows:
Regular funds: Maintenance:
   Minor repairs to breakwater by U. S. derrick boat Erie August
      1934 --------       -----------------------------------    $7, 500. 00
   Dredging by U. S. hopper dredges Taylor and Burton August
      1934 and June 1935   ---     -------------------------     13, 999. 79
         Total funds--------------------------------------                         21, 499. 79
   The balance unexpended of allotments from the National Indus-
trial Recovery Act will be applied as follows:
Accounts payable June 30, 1934-------------.            $25, 395. 81
New work: Rectification of the first bend above the
Nickel Plate Bridge and enlarging the turning basin
by contract July 1934 to December 1934_...-------     $76, 608. 55
Maintenance: Dredging channel in river for city of Lo-
rain from present project to turning basin by U. S.
hopper dredge Burton July 1934 to October 1934.... 54, 420. 02
                                                                                   131, 028. 57

      Total ------------------------------------------                             156, 424. 38
  Redredging is required annually and minor repairs to breakwaters
are necessary. For these items of maintenance, funds can be profit-
ably expended during the fiscal year 1936 as follows:
Dredging by U. S. hopper dredge Burton_____________      __________ $11, 800
Minor repairs to breakwater by U. S. derrick boat Erie_-------__      7, 500
      Total -------------------                                                      -19,   300
1170           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                              1934

                                             Cost and financial summary
                                    MAINTENANCE AND IMPROVEMENT                                    FUNDS

Cost of new work to June 30, 1934------------------------                                                             $1, 310, 521. 21
Cost of maintenance to June 30, 1934 ___-----------    ---                                                                229, 159. 21

           Total cost of permanent work to June 30, 1934----------                                                     1, 539, 680. 42

Net total expenditures ---------------------------------    1, 539, 680. 42
Unexpended balance June 30, 1934---------------------------     21, 499. 79

           Total amount appropriated to June 30, 1934                                         ------------.               , 561, 180. 21

    Fiscal year ending June 30                        1930                  1931               1932            1933             1934


Cost of new work.........                ......
                   -------------------------                           $26, 322. 89          $11, 313.19     $83, 619. 96                --
Cost of maintenance.......-------------                $934. 48         25, 107. 66           11, 956. 85     10, 299. 85      $17, 505. 84

       Total cost-- ---------------                      934. 48         51, 430. 55          23, 270. 04     93, 919. 81       17, 505. 84

Total expended----------------                        5, 624. 58         44, 003. 47          31, 206. 68     93, 559. 30       17, 866. 35

Allotted ------------------------                    16, 800. 00           69, 500. 00      -12, 500. 00      95, 568. 97       37, 356. 47


Balance unexpended July 1, 1933$----------------------------2, 009. 67
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934----------------------$19, 300. 00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933----------------------- 18, 436. 51
                                                              37, 736. 51
      Amount to be accounted for-_-----------------                 39, 746. 18
Deductions on account of revocation of allotment----------- -----       380. 04
      Net amount to be accounted for ----------------------- 39, 366. 14
Gross amount expended    --------------------------    $18, 189. 98
Less reimbursements collected                               323. 63
                                                                    17, 866. 35
      Balance unexpended June 30, 1934 ---------------------- 21, 499. 79

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance - - __ - - - - - - -
                                              __ - ___- __ _____
                                                             - - -
                                                                                                                             19, 300. 00
                                                       PUBLIO WORKS FUNDS

Cost of new work to June 30, 1934------ -------------------  $88, 391.45
Cost of maintenance to June 30, 1934------------------------21, 879. 98
     Total cost of permanent work to June 30, 1934----------- 110, 271.43
Minus accounts payable June 30, 1934------------------------ 25, 395. 81

     Net total expenditures------- ------------------------ 84, 875. 62
Unexpended balance June 30, 1934   --------------------------156,424.38
           Total amount appropriated to June 30, 1934-------------                                                          241, 300.00

           Fiscal year ending June 30                               1930             1931             1932         1933           1934

Cost of new work-----                                -----------------------------------
                                                  -------                                                     ------------ $88, 391. 45
Cost of maintenance-------                                   ------------
                                                                       --------------------- ------------                        21, 879.98
        Total cost------------------------------------------------                                                             110, 271. 43
Total expended            ---------------------------...............----------------------------------                           84, 875. 62
Allotted.........................                            I----------------------------_-- ---------                        241, 300. 00

    1 In addition, $3,000             aas
                               expended from contributed funds.
      Exclusive of available funds.
                    RIVERS AND HARBORS--BUFFALO, N. Y., DISTRICT                                                        1171
Amount allotted from National Industrial Recovery Act ap-
  proved June 16, 1933 _- _________ --     -------          $1, 201, 300. 00
Deductions on account of revocation of allotment-----------     960, 000. 00
       Net amount to be accounted for ___________________                                                         241, 300. 00
'Gross amount expended_---------_______--------_                                                                   84, 875. 62

      Balance unexpended June 30, 1934_ .-......    - _____-..                                                    156, 424. i8
Outstanding liabilities June 30, 1934_.............  $16, 829. 92
Amount covered by uncompleted contracts ---------- 75, 774. 44
                                                                                                                   92, 604. 36
             Balance available June 30, 1934___ --                              _ _____----------63,                   820. 02

Amount (estimated) required to be appropriated for completion
  of Public Works Administration project 1__ _ - - - - - - - - - - -                                              603, 000. 00
          CONSOLIDATED             COST AND FINANOIAL SUMMARY                       FOR LORAIN       HARBOR,        OHIO
                                          _
,Cost of new work to June 30, 1934 2-______  __       _____                                                 $1, 398, 912. 66
,Cost of maintenance to June 30, 1934---- ________--______                                                      251, 039. 19
     Total cost of permanent work to June 30, 1934__--__                                                     1, 649, 951. 85
Minus accounts payable June 30, 1934_   __________________                                                       25, 395. 81
     Net total expenditures__----------_________-__1___                                                     1, 624, 556. 04
Unexpended balance June 30, 1934___.__          -________-                                               -___-177, 924. 17
             Total amount appropriated to June 30, 1934_------___                                            1, 802, 480. 21

        Fiscal year ending June 30                    1930         1931              1932            1933              1934


Cost of new work.-------------....               ------------    $26, 322. 89      $11, 313. 19    $83, 619. 96       $88, 391. 45
Cost of maintenance-------------                      $934. 48    25, 107. 66        11, 956. 85    10, 299. 85        39, 385. 82
          Total cost ----------------                  934. 48    51, 430. 55       23, 270. 04     93, 919. 81       127, 777. 27
Total expended..------...........----------...      5, 624. 58    44, 003. 47       31, 206. 68     93, 559. 30       102, 741. 97
Allotted---------------------                      16, 800. 00    69, 500. 00     -12, 500. 00      95, 568. 97       278, 656. 47


Balance unexpended July 1, 1933----------------------------                                                        $2, 009. 67
Amount allotted from War Department Appropri-
  ation Act approved Apr. 26, 1934_______________      $19, 300. 00
Amount allotted from War Department Appropri-
ation Act approved Mar. 4, 1933_____---  _____-18,         436. 51
Amount allotted from National Industrial Recov-
ery Act approved June 16, 1933 -----------         1, 201, 300. 00
                                                                        1, 239, 036. 51
       Amount to be accounted for__________-___-             --____-    1, 241, 046.18
Deductions on account of revocation of allotment        ___--        __    960, 380. 04
       Net amount to be accounted for- ____________
                                               --           ______-280, 666. 14
,Gross amount expended ______--------_____               $103, 065. 60
Less reimbursements collected--__-------             _         323. 63
                                                                           102, 741. 97
       Balance unexpended June 30, 1934 ____       _______    __----       177, 924. 17
,Outstanding liabilities June 30, 1934_____________-      $16, 829.92
Amount covered by uncompleted contracts---------          75, 774. 44
                                                                            92, 604. 36
       Balance available June 30, 1934_ .. __________----      -----        85, 319. 81
Amount (estimated) required to be appropriated for completion
  of Public Works Administration project _______________                   603, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1936, for maintenance -_-___-__--  -----                                                                 19, 300,. 00
    1Exclusive of available funds.
        In addition, $3,000 was expended from contributed funds.
1172   REPORT OF   CHIEF OF   ENGINEERS, U.   S.   ARMY,   1934

                   4. CLEVELAND HARBOR, OHIO

   Location.On the south shore of Lake Erie, at the mouth of the
Cuyahoga River, 176 miles westerly from Buffalo, N. Y. (See U. S.
Lake Survey Chart No. 3.)
   Previous projects.-Adopted by acts of March 3, 1825, June 23,
1866, March 3, 1875, August 5, 1886, and August 11, 1888. The
total cost and expenditures were $1,564,153.56 for new work and
maintenance (not separable). For further details see page 1962 of
Annual Report for 1915.
   Existing project.-This provides for the formation of an outer
harbor 5 miles long and 1,600 to 2,400 feet wide, 19 feet deep, with
provisional dredging to 23 feet, and constructing 2 breakwaters,
the east one to be 21,270 feet long, with pierhead at easterly end, of
which 3,300 feet is of timber-crib substructure with stone superstruc-
ture and 17,970 feet of rubble-mound construction; and the west one,
which is connected with the shore, to be 7,130 feet long, comprising
5,997 feet of timber cribs with concrete superstructure, a " gap " of
201 feet, and 932 feet of pile and timber-crib construction; a main
entrance 700 feet wide between converging rubble-mound break-
waters extending 1,250 feet lakeward from and between the main
breakwaters; 2 parallel stone-filled timber-crib piers with concrete
superstructure, 325 feet apart, at the mouth of Cuyahoga River; the
east pier to be 1,602 feet long and the west pier 1,738 feet long; a
channel between them 19 feet deep, provisional dredging to 23 feet,
and 2,000 feet long measured from the outer end of the piers;
straightening and improving 41/2 miles of Cuyahoga River in co-
operation with the city of Cleveland, at a cost to the United States,
not to exceed $400,000; and a stone-filled wooden-pile wharf with
concrete superstructure, and a reinforced-concrete storehouse at the
foot of East Ninth Street in the outer harbor.
   The project depths are referred to low-water datum for Lake Erie,
which is taken at 570.5 feet above mean tide level at New York.
Ordinary fluctuations of water level are from 3 feet above to 0.5 foot
below low-water datum, and extreme fluctuations produced by wind
and other causes are from 4.5 feet above to 1 foot below that plane.
   The estimate of cost for new work, revised in 1932, to include
$400,000 for the straightening of Cuyahoga River, is $5,442,000,
exclusive of amounts expended on previous projects; inclusive of
provisional dredging to 23 feet, revised in 1932, $5,580,000. The
latest (1928) approved estimate of cost for annual maintenance is;
$40,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1875, provided for the west break-
water (Annual Report for 1876, p. 558); the act of August 5, 1886,
provided for a part of the east breakwater (Annual Report for 1886,
p. 1865); the act of June 3, 1896, provided for rebuilding the piers
and completing the east breakwater (H. Doc. No. 326, 54th Cong.,
1st sess., and Annual Report for 1896, p. 2949); the act of March 3,
1899, as modified by the act of June 13, 1902, provided for the chan-
nel between the piers and the east and west outer-harbor basins 19
feet deep and provisional dredging to 23 feet depth (H. Doc. No.
156, 55th Cong., 3d sess., and Annual Report for 1899, pp. 3075 and
         RIVERS AND HARBORS-BUFFALO,         N. Y., DISTRICT     1173
3078); the act of June 13, 1902, provided for the main harbor en-
trance and east breakwater extension (H. Doc. No. 118, 56th Cong.,
2d sess.) ; the act of March 2, 1907, provided for the wharf and store-
house (H. Doc. No. 270, 59th Cong., 2d sess.); the act of June 25,
1910, provided for closing a gap in the east breakwater (report not
printed); the act of July 27, 1916, provided for the pierhead at the
easterly end of the east breakwater (H. Doc. No. 891, 63d Cong., 2d
sess.); and the act of August 8, 1917, provided for the improvement
of Cuyahoga River (H. Doc. No. 707, 63d Cong., 2d sess.). For the
latest published map of Cleveland Harbor see House Document No.
477, Seventy-second Congress, second session.
   Supplementing the work authorized by Congress, the deepening to
25 feet of the west basin, the entrance channel through the outer
harbor and between the piers up to the New York Central swing
bridge, and that part of the east basin located westerly from a line
drawn perpendicular to the east main breakwater, beginning 800
feet easterly from the westerly end thereof; removal of the easterly
150 feet of the main west breakwater; construction of a spur break-
water 400 feet long to protect the gap in the west breakwater shore
arm; elimination from the project of the present authorization for
extending the west pier 298 feet southward; and for the abandonment
of the inner 932 feet of the shore arm of the west breakwater, at a
total estimated cost of $600,000, with no increase in the estimated
cost of annual maintenance, as recommended by the Chief of En-
gineers in House Document No. 477, Seventy-second Congress, second
session, has been included in the Public Works program under the
National Industrial Recovery Act.
   Recommended modifications of project. Included in Public Works
program.
   Local cooperation.-The River and Harbor Act of August 8, 1917,
appropriated $5,000 to enable the United States to cooperate with the
city of Cleveland in the preparation of final plans for the improve-
ment of the Cuyahoga River, with the provision that the Govern-
ment's share in the cost of the improvement, in accordance with the
final plans adopted, shall not exceed $400,000. Final plans were
approved by the Secretary of War March 13, 1931.
   Terminal facilities.-Outer harbor: The city of Cleveland owns
two wharves at the foot of East Ninth Street. The Pennsylvania
Railroad Co. operates an extensive ore terminal west of the river
entrance. East of the river there are 3 slips providing. wharves
for 2 coal-loading machines and for passenger and packet freight
business and 1 wharf used for shipping automobiles, all of which
are privately owned and are open to shippers of commodities for
which the facilities are suited. One lumber wharf, one for builders'
supplies, one for general merchandise, and the United States
Engineer Department wharf are private.
   Inner harbor: The Cuyahoga River, together with the Old River
and connecting slips, provides approximately 13 miles of wharves,
about 50 percent of which are used. One railroad company main-
tains a coal terminal and one has an ore terminal. Three railroads
have wharves for the transshipment of packet and miscellaneous
freight. These facilities are open to all shippers. Four companies
operating blast furnaces have private terminals for ore and lime-
1174    REPORT OF   CHIEF OF    ENGINEERS,   U.   S. ARMY,   1934


stone. Two docks are equipped with grain elevators, which are not
open to the public. There are extensive lumber wharves, and con-
siderable quantities of sand, gravel, crushed stone, oil, and fish are
handled over river docks by their private owners. The city of Cleve-
land owns public docks at several street ends. The facilities are
considered adequate for the needs of existing commerce of Cleveland
Harbor.
    Operations and results during fiscal year.-The U. S. hopper
dredge Taylor restored the entrance channel to project depth and
deepened a portion of the east basin. Cost, $7,345.91. Government
plant and hired labor made minor repairs to the east breakwater.
Cost, $13,513.28.
    The total maintenance cost for the fiscal year was $20,859.19, and
the total expenditure was - $165,379.24, all from regular funds.
    Work conducted under authorization of the Federal Emergency
Administration of Public Works consisted of deepening the west
basin and entrance channel to 25 feet below low water datum by con-
tract. This work was in progress at the end of the fiscal year.
About 30 percent of the west basin has been dredged.
    The cost of this new work for the fiscal year was $130,416.21 and
the expenditure was $117,675.58.
    Condition at end of fiscal year.-The existing project is 93 percent
completed. The river entrance channel has been improved by the
construction of parallel piers 325 feet apart and dredging to a depth
of 23 feet at low-water datum up to the New York Central Railroad
bridge. The east pier and 1,440 feet of the west pier were com-
pleted in 1900 and the dredging in 1909. An outer harbor, about
1,300 acres in extent, has been formed by the construction of an
aggregate length of about 30,700 feet of breakwater, including con-
verging arms, completed in 1915. The main entrance has been
widened to 700 feet and protected by converging arms extending
lakeward from the east and west breakwaters, completed in 1908.
The outer harbor was deepened, 1905-9, to 23 feet at low-water
datum throughout the west basin, in the entrance channel, and over
a portion of the east basin adjacent to the entrance channel. Over
the remaining portion of the east basin, as far east as East Ninth
Street, a depth of 21 feet at low-water datum has generally been
secured. A wharf was built at the foot of East Ninth Street in
1910 and a storehouse in 1915. A concrete base for light tower was
constructed at east end of east breakwater in 1917 in lieu of the east-
end pierhead. The harbor structures were generally in good con-
dition at the end of the year, except the shore end of the west break-
water, 932 feet long, which has not been maintained. The inner 437
feet of this shore arm is now buried in the upland. The breakwater
requires some minor repairs.
    The superstructure of the East Ninth Street Wharf has been
replaced with concrete.
    All work provided for by the project has been completed, except
cooperatively, widening the mouth of the river, extending west pier
298 feet upstream, and straightening and improving the channel of
Ciuyahoga River.
    At the end of the fiscal year the controlling depth in the main
entrance channel and through the west basin was 21 feet. The con-
           RIVERS AND HARBORS-BUFFALO,                                  N.   Y.,   DISTRICT        1175
trolling depth in the channel through the east basin to East Ninth
Street was 20 feet. East of East Ninth Street, depths range from
19 to 30 feet outside the harbor line. Depths elsewhere in the project
area range from 10 to 21 feet.
   The total cost of the existing project to the end of the fiscal year
was $7,272,292.48, of which $5,178,068.81 was for new work and
$2,094,223.67 for maintenance. Total expenditure was $7,302,854.68.
   The work authorized under the Public Works Administration is 21
percent completed. Completion of the deepening of the west basin
and entrance channel to 25 feet, removal of the easterly 150 feet of
the main west breakwater and construction of a spur breakwater 400
feet long to protect the gap in the west breakwater shore arm re-
main to be done to complete the work authorized. The deepening is
now in progress by contract and it is expected that the removal of
the easterly end of the main west breakwater and construction of the
spur breakwater will be done during the fiscal year 1935.
   The total cost of this new work to the end of the fiscal year was
$130,416.21. The total expenditure was $117,675.58.
   The total cost of the improvement, all funds, was $7,402,708.69, of
which $5,308,485.02 was for new work and $2,094,223.67 for mainte-
nance. The total expenditure was $7,420,530.26.
   Proposed operations.-The balance unexpended including ac-
counts receivable, at the end of the year will be applied as follows:
Regular funds: Accounts payable June 30, 1934----------------       $1, 454. 35
Maintenance:
   Dredging by U. S. hopper dredges Burton and Taylor
      December 1934 and March 1935--------------       $17, 242. 35
    Minor repairs to breakwaters by U. S. derrick boat
      Erie September 1934    _--------------------      17, 000. 00
                                                                    34, 242. 35

       Total funds            ---------------------------------------                          35, 696. 70
   The balance unexpended of allotments from the National Indus-
trial Recovery Act, $354,324.42, will be applied to completion of
deepening the west basin, entrance channel and a portion of the
east basin to 25 feet by contract in force July 1934 to November
1935.
   The additional allotment of $150,000 made during July 1934
will be applied as follows:
Removing approximately 150 linear feet of the easterly end of the
  existing west main breakwater--------------------------- $18, 000. 00
Construction of a rubble mound sea slope to protect the new easterly
end of the west main breakwater---------------------------          35, 000. 00
Construction of a rubble mound spur breakwater approximately 400
  feet long to protect the gap in the shore arm of the west main
  breakwater---        -------------------------------------         97, 000. 00

      Total-------------------------------------------                                        150, 000. 00
  Redredging is required annually and minor repairs to break-
waters are necessary. For these items of maintenance, funds can
be profitably expended during the fiscal year 1936 as follows:
Dredging by U. S. hopper dredge Burton and Taylor----------$50,000. 00
Minor repairs to breakwaters by U. S. derrick boat Erie-------. 15, 000. 00

       Total ------------------                                         -          -65,           000. 00
1176            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

                                                  Cost and financial summary
                                      MAINTENANCE                AND IMPROVEMENT                FUNDS


Cost of new work to June 30, 1934_________________________ $6, 742, 222.37
Cost of maintenance to June 30, 1934_____________________ 2, 094, 223. 67

            Total cost of permanent work to June 30, 1934-------- 8, 836, 446. 04
Value- of plant, materials, etc., on hand June 30, 1934-------_       22, 754. 12
       Net total cost to June 30, 1934 ____________________                                                             8, 859, 200. 16
:Plus accounts receivable June 30, 1934________________________                                                              9, 262. 43
            Gross total costs to June 30, 1934______________________                                                 8, 868, 462.59
:Minus accounts payable June 30, 1934 ________                                            ________-                 -     1, 454. 35
     Net total expenditures _______________________                                                                     8, 867, 008.24
Unexpended balance June 30, 1934___                                                                                         26, 434. 27
            Total amount appropriated to June 30, 1934 __--------_                                                      8, 893, 442. 51

     Fiscal year ending June 30                         1930               1931              1932          1933                   1934


Cost of new work.-------                       -------------------------------                            $8, 254. 38 -----------
Cost of maintenance-..---.....--------...             $64, 141. 37     $182, 113. 32      $170, 551. 49   61, 016. 76            $20, 859. 19
        Total cost.......----------------64,141. 37                     182,113. 32        170, 551.49    69,271.14               20, 859.,19
Total expended ....-------------............           43, 392. 86       181, 506. 40      299, 459. 58   22, 935. 99        -165, 379. 24
Allotted.....-------------------                      167, 000. 00      219, 400. 00        84, 000. 00    5, 512. 88        -150,   893. 96


Balance unexpended July 1, 1933__-_________-------------.                                                                 $11, 948.99
Amount allotted from War Department Appropriation Act ap-
proved Mar. 4, 1933_-__      -
                            __--   -  -   - __-     -------
                                                    --                                                                    134, 100. 00

      Amount to be accounted for __-___________-_________                                                                 146, 048.99
-Deductions on account of revocation of allotment and impounded
  funds                                                                                                                    84, 993.96
                                                                                                                          2-----------------------------

       Net amount to be accounted for __-   -_____-___-         -- 138, 944.97
,Gross amount expended _______   _______---------$80, 265.00
:Less:
     Reimbursements collected----------$46, 370. 21
     Receipts from sales--------------- 199, 274.03
                                                    245, 644.24
                                                                -165, 379. 24

      Balance unexpended June 30, 1934____------ ___ -                                                        ---           26, 434.27
~utstanding liabilities June 30, 1934-----------__----------                                                                 2, 584.96

      Balance available June 30, 1934-                                            ----------------                          23, 849.31
Accounts receivable June 30, 1934_.  .                                             ___-                             -        9  262.43
                                                                                                                             9,--------------

            Unobligated balance available June 30, 1934_...........                                                         33,111.74

Amount (estimated) required- - to  be appropriated for completion of
                    - - -- - -  - - - - - - - - - - - - - - - - - - - - ---- -----
existing project 1                                                                                                        400, 000. 00

Amount that can be profitably expended   in - -fiscal year ending
                               1                -- ------
June 30, 1936, for maintenance _________________6                                                                           5, 000. 00

     1 Exclusive of available funds.
                RIVERS AND HARBORS-BUFFALO,                                        N. Y., DISTRICT                          1177
                                          PUBLIC WORKS FUNDS

'Cost of new work to June 30, 1934_                                   ._______ ____                                   130, 416. 21
Cost of maintenance to June 30, 1934_

'Total cost of permanent work to June 30, 1934--------------130, 416. 21
Minus accounts payable June 30, 1934 ---------   ----------   12, 740. 63

       Net total expenditures ---- ___--____ --       -                                             -- __            117, 675. 58
  Unexpended balance June 30, 1934 .-----  __   ---------                                                    -       354, 324.42

          Total amount appropriated to June 30, 1934------------                                                     472, 000. 00

         Fiscal year ending June 30                     1930              1931               1932           1933            1934


,Cost of new work....  -----------------------------------------------------     $130, 416. 21
'Cost of maintenance__--------------------------------------------       ------------------
'Total expended....--------------               -----------------------------------------                                 117, 675. 58
Allotted.........-----------------------------------------------------------------472, 000. 00


Amount allotted from National Industrial Recovery Act, approved
  June 16, 1933-----------------         --------------------- $485, 000. 00
Deductions on account of revocation of allotment -------         13, 000. 00
       Net amount, to be accounted for ------------------------                                                      472, 000. 00
,Gross amount expended-- __-__ ______ -         _____     ______                                                     117, '675. 58
                                     ---
     Balance unexpended June 30, 1934______________    ___   354, 324. 42
Amount covered by uncompleted contracts--------------------337, 308. 36
      Balance available June 30, 1934------------------------                                                          17, 016. 06
Amount allotted by Public Works Administration Emergency Ap-
  propriation Act, fiscal year 1935____---------- -----                                                               150, 000. 00

          Balance available for fiscal year 1935 _______                                       ___------             167, 016. 06
     CONSOLIDATED          COST ANID FINANCIAL                 SUMMARY         FOR cLEVELAND                HARBOR,      OHIO

,Cost of new work to June 30, 1934---------------------------$6, 872, 638. 58
                                                    -
'Cost of maintenance to June 30, 1934___________-_____- -   -_ 2, 094, 223. 67
      Total cost of permanent work to June 30, 1934--8---------                                                      , 966, 862. 25
Value of plant, materials, etc., on hand June 30, 1934-_______                                                          22, 754. 12
      Net total cost to June 30, 1934                                                                               989, 616. 37
                                                                                                                 8-----------------------,
Plus accounts receivable June 30, 1934--------                                      __-_____                           9, 262. 43
     Gross total costs to June 30, 1934---__            ___                                                       , 998, 878. 80
                                                                                                                 8-------_
Minus accounts payable June 30, 1934_______ ___________-__                                                           14, 194. 98
      Net total expenditures -----------------------------                                                       8, 984, 683. 82
Unexpended balance June 30, 19,34__                                                                                 380, 758. 69
         Total amount appropriated to June 30, 1934_____________                                                 9, 365, 442. 51

    Fiscal year ending June 30            1930                    1931              1932                1933               1934

'Cost of new work ......        _     _______.--------------                   --------------
                                                                                     ..                $8, 254. 38       $130, 416. 21
'Cost of maintenance-............      $64, 141. 37            $182, 113. 32     $170, 551. 49         61, 016. 76         20, 859. 19
                                               ....                                    U-
                                                                                     .....
      Total cost----------------         64, 141. 37            182, 113. 32      170, 551.49          69, 271. 14        151, 275. 40
Total expended _-_-.....              - 43, 392. 86             181, 506.40       299, 459. 58         22, 935. 99       -47; 703. 66

Allotted_ _-----------------           167, 000.00              219,400. 00        84, 000. 00          5, 512. 88        321, 106. 04
1178     REPORT     OF CHIEF OF ENGINEERS, U.              S. ARMY,     1934

Balance unexpended July 1, 1933---------------------------        $11, 948. 99
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933--------------------     $134, 100. 00
Amount allotted from National Industrial Recovery
  Act approved June 16, 1933__---------------------485, 000. 00
                                                                  619, 100. 00,

      Amount to be accounted for       _------------------------ 631,048. 99
Deductions on account of revocation of allotment and impounded
funds -------     ----------                                    297, 993. 96

      Net amount to be accounted for------------------------                333, 055. 03"
Gross amount expended-------------------------               $197, 940. 58
Less:
    Reimbursements collected----------$46, 370. 21
    Receipts from sales---------------199, 274. 03
                                                              245, 644. 24
                                                                           -47, 703. 66:

      Balance unexpended June 30, 1934         -------------------- 380, 758.691
Outstanding liabilities June 30, 1934________________       $2, 584. 96
Amount covered by uncompleted contracts---------           337, 308. 36
                                                                        339, 893. 32

      Balance available June 30, 1934---------------------------             40, 865.37
Accounts receivable June 30, 1934-----------------------------                9, 262. 43

     Unobligated balance available June 30, 1934 _______________ 50, 127. 80
Amount allotted by Public Works Administration, Emergency Ap-
propriation Act, fiscal year 1935____-
                                      _____
                                  -------                        150, 000. 00

                                             -------------------
       Balance available for fiscal year 1935__                             200, 127. 80°

Amount (estimated) required to be appropriated for completion of
                                          -   -
existing project1 -              _______________._   ____       400, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance--           -          ----
                                              ___________________             5, 000.00'
                                                                             6--__

                         5. FAIRPORT HARBOR, OHIO

  Location.-On the south shore of Lake Erie, at the mouth of the
Grand River, 33 miles easterly from Cleveland, Ohio. (See U. S..
Lake Survey Chart No. 3.)
  Previous projects.-Adopted by River and Harbor Acts of March
3, 1825, and May 20, 1826. The total cost and expenditures were.
$368,940.09 for new work and maintenance (not separable). For
further details see page 1963 of Annual Report for 1915.
  Existing project.-This provides for the construction of two break-
waters to form an outer harbor about 360 acres in area, the west
breakwater to be 3,378 feet long and connected with the shore and'
the east one 6,750 feet long, the pierheads at the outer end of each
breakwater to be 600 feet apart; two parallel timber-crib piers 180
feet apart at the mouth of Grand River, about 793 feet long on the
west side and 1,252 feet long on the east side, including the inner 674-
feet, which has not been maintained; and for dredging the outer
harbor and the channel between the piers to a depth of 19 feet.
   The project depth is referred to low-water datum for Lake Erie,.
which is taken at 570.5 feet above mean tide level at New York.
Ordinary fluctuations of water level are between 3 feet above and 0.5
foot below low-water datum, and extreme fluctuations, produced by
  1Exclusive of available funds.
           RIVERS AND HARBORS-BUFFALO,        N.   Y.,   DISTRICT   1179
wind and other causes, are from 4 feet above to 1 foot below that
plane.
   The estimated cost of new work, revised in 1930, is $1,810,000, ex-
clusive of amounts expended on previous projects. The latest (1928)
approved estimate for annual cost of maintenance is $15,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1825, modified by the acts of 1830,
1881, and 1890, provided for the piers; the acts of March 24, 1896,
and June 3, 1896, modified by the act of March 3, 1905, provided for
the breakwaters (H. Doe. No. 347, 54th Cong., 1st sess., and Annual
Reports for 1903, p. 2084, and 1905, p. 2349) and the act of March 2,
1919, provided for a 1,400-foot extension of the east breakwater, for
the present dimensions of the piers and for the dredging (H. Doc.
No. 206, 63d Cong., 1st sess.), and the act of January 21, 1927, modi-
fied by the act of July 3, 1930, provided for a 4,000-foot extension of
the east breakwater at a limit of cost to the United States of $715,000
 (H. Doc. No. 592, 69th Cong., 2d sess.). For the latest published
map see House Document No. 472, Seventy-second Congress, second
session.
    Supplementing the work authorized by Congress, the deepening
and widening of the entrance and river channels and extending the
west breakwater northward for a distance of 500 feet, as recom-
mended by the Chief of Engineers in House Document No. 472, Sev-
enty-second Congress, second session, has been included in the Pub-
lic Works program under the National Industrial Recovery Act.
    Recoimmended modifications of project.--Under date of August 11,
1932, the Chief of Engineers recommended modification of the exist-
ing project so as to provide for a depth of 25 feet in soft material
and 26 feet in hard material in the entrance channel and, basin; for
the removal of the west pier at the entrance to Grand River; and
widening the river channel to 300 feet with a depth of 25 feet from
the entrance between the piers to a point 1,300 feet above the present
project limit; for the construction of a bulkhead on the west side of
the widened channel; and for the extension of the west, breakwater
northward for a distance of 500 feet, all at an estimated cost of
$580,000 with $1,000 annually for maintenance in addition to that
now required; subject to certain conditions of local cooperation (H.
Doc. 472, 72d Cong., 2d sess.). Deepening and widening of the en-
trance and river channels and extension of the west breakwater have
been included in the Public Works program.
   Local cooperation.-The River and Harbor Act of January 21,
1927, requires local interests to contribute $304,000 toward the cost of
extending the breakwater 4,000 feet and dredge the channel of ap-
proach to their terminal at their own expense. The River and Har-
bor Act approved July 3, 1930, waived the condition requiring local
interests to contribute to the cost of the breakwater extension. The
condition requiring dredging has not been complied with.
    The channel widening at the river mouth included in the Public
Works program is subject to the proviso that local interests transfer
free of cost to the United States the necessary lands or easements
required in connection with that work. Transfer of the necessary
lands and rights-of-way is now being arranged by local interests.
1180   REPORT OF CHIEF OF      ENGINEERS,    U.   S. ARMY,   1934

    Terminal facilities.-The Baltimore & Ohio Railroad Co. has ob-
tained and maintained a channel in the river with an available depth
of 18 feet at low-water datum for about 1 mile above the limits of
the Federal project.
    The Fairport, Painesville & Eastern Railroad Co. has extended
this channel about 2,200 feet farther upstream to afford access to
docks in connection with the Diamond Alkali Co. One large ore
terminal, 1 coal dock, and 1 dock equipped with a warehouse for
miscellaneous freight and elevator for handling grain do a general
public business. One limestone dock and 4 fish docks are privately
owned. There are no publicly owned terminals. The facilities are
regarded as adequate for the needs of existing commerce.
    Operations and results during fiscal year.-New work.-Deepening
of the east and west basins in the outer harbor to 19 feet, by con-
tract, was completed. Cost $48,680.03.
    Maintenance.-The U. S. hopper dredge Taylor restored the proj-
ect depth in the outer entrance channel and between the piers. Cost
$10,205.95. Government plant and hired labor made minor repairs
to 745 feet of the breakwaters. Cost $9,590.48.
    The total cost for the year was $68,476.46 of which $48,680.03 was
for new work and $19,796.43 was for maintenance. Total expendi-
ture was $73,117.46, all from regular funds.
    Under authority of the Federal Emergency Administration of
Public Works, precontract work has been largely completed and a
contract for the breakwater extension was entered into in Juine 1934.
No work has yet been done under this contract. Cost $3,943.15.
Expenditure $3,825.91.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1933 at a saving of $239,931. The harbor has been im-
proved by the construction of parallel piers 190 feet apart at the
mouth of the Grand River. The west pier is 788.2 feet long and
the east pier 1,252 feet long. The inner 671.5 feet of the east pier
has not been maintained and has fallen into decay. The piers were
completed in 1904. Two outer breakwaters have been constructed
with a total length of 10,128 feet, sheltering an area of about 360
acres. An area of about 62 acres has been dredged to a depth of 19
feet in the east and west basin of the outer harbor and an entrance
channel, 19 feet deep, has been dredged outside the breakwater and
between the piers.
    The controlling depth in the channel and the outer harbor is 19
feet at low water datum. The harbor works are in good condition
except for some minor repairs to breakwaters.
    The total cost of the existing project to the end of the fiscal
year was $1,990,929.66, of which $1,570,068.88 was for new work
and $420,860.78 for maintenance. The total expenditure was
 $1,990,832.47.
    The Federal Emergency Administration of Public Works has
  authorized the following work: Widening the river mouth, to 300
  feet for a distance of 1,300 feet above the Federal project limits, ex-
  tending the west breakwater 500 feet lakeward and deepening the
  entrance channel and basin to 25 feet in soft material and 26 feet
  in hard material. Extending the breakwater 500 feet lakeward is
                  RIVERS AND HARBORS-BUFFALO,                                           N. Y., DISTRICT                    1181
under         contract.               Widening the river mouth will be done during
fiscal year 1935-36.
   The total cost of this new work to the end of the fiscal year was
$3,943.15. The total expenditure was $3,825.91. The cost of the
improvement, all funds, was $1,574,012.03 for new work and $420,-
860.78 for maintenance, a total of $1,994,872.81. The total expendi-
ture was $1,994,658.38.
  Proposed operations.--The balance unexpended at the end of the
year will be applied as follows:
Regular funds: Accounts payable June 30, 1934_____________---        $97. 19
Maintenance: Dredging by U. S. hopper dredge Taylor, April 1935__ 8, 981.17

            Total funds----------------------------------------                                                         9,078.36
  The balance unexpended of allotments under the National In-
dustrial Recovery Act will be applied as follows:
Accounts payable June 30, 1934 __-      __ __ __                                                                         $117. 24
New work:
   Extension of the west breakwater 500 feet lake-
     ward by contract in force July 1934-June 1935_ $171, 056. 85
    Widening the mouth of the Grand River to 300
     feet by contract August 1934-September 1935...  180, 000. 00
                                                                                                                      351, 056. 85

            Total funds---------------------------------------351,                                                         174. 09
  Redredging is required annually and minor repairs to the break-
waters are necessary. For these items of maintenance, funds can be
profitably expended during the fiscal year 1936, as follows:
Dredging by U. S. hopper dredge Taylor----------------------------                                                        $15, 500
Minor repairs to breakwaters by U. S. derrick boat Erie                                                                    1--------------5,
                                                                                                                               000
            Total------                          --------------------------------------                                    30, 500
                                                  Cost and financial summary

                                      MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934________-                  __$1,                                                     939, 008. 97
Cost of maintenance to June 30, 1934. ------------------------                                                        420, 860. 78
     Total cost of permanent work to June 30, 1934_ .... __. 2, 359, 869. 75
Minus accounts payable June 30, 1934 ______________ -   -   -    -    97. 19

     Net total expenditures_________________--______
Unexpended balance June 30, 1934----______--       ____                                                ____     2, 359, 772. 56
                                                                                                                     9,078. 36
            Total amount appropriated to June 30,                                    1.934..------------        2.368, 850. 92

     Fiscal year ending June 30                         1930            1931              1932           1933              1934


Cost of new work- ..............__      _                            $260, 163. 65     $378,903.49     $52, 267. 74       $48, 680. 03
Cost of maintenance---
                    ..... ....     $7, 044. 57                          6, 160. 33       12, 480. 56     7, 933.88         19, 796. 43
         Total cost .--------------......        --... 7, 044.57      266, 323. 98      391, 384. 05    60, 201. 62        68, 476. 46
Total expended-----------------...............          7,127.83      164, 086.36       492, 274.77     56, 522. 39        73, 117. 46
Allotted-------------................-- ------         12, 500.00     650, 000. 00     -10, 932. 86    106, 703. 47        30, 955. 78
1182        REPORT OF CHIEF OF ENGINEERS,                                        U. S. ARMY, 19 34

Balance unexpended July 1, 1933_______ ________           -_________
                                                                   $51, 240. 04
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934-------   ---------------- $8,200. 00
Amount allotted from War Department Appropriation
  Act approved July 14, 1932____.___-______-___         1,755. 78
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933 ------ __  _____________   21, 000. 00
                                                                    30, 955. 78
      Amount to be accounted for_____     ______________________                                              82, 195. 82
Gross amount expended--------------------------       $73, 176. 35
Less reimbursements collected_-- -    __-       ___-        58. 89
                                                                                                              73, 117. 46
      Balance unexpended June 30, 1934------------------------                                                 9,078.36
Outstanding liabilities June 30, 1934_ ...... ___.____-_______                                                    97. 19
         Balance available June 30, 1934_-.....-____                                          ___-_____        8,981. 17


                                          1_____________________
Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance                             ___________                                            30, 500. 00

                                         PURLIO       WORKS FUNDS

Cost of new work to June 30, 1934                                                                             $3, 943. 15
Cost of maintenance to June 30, 1934_________
      Total cost of permanent work to June 30, 1934 _________-                                                 3, 943. 15
Minus accounts payable June 30, 1934 ______ ________________                                                      117.24

     Net total expenditures_ .......    __._____                                                 ____- -   - 3, 825. 91
Unexpended balance June 30, 1934- --------------....                                                 _____ 351, 174.09
         Total amount appropriated to June 30, 1934_____________                                             355, 000. 00

         Fiscal year ending June 30                  1930              1931               1932        1933         1934

Cost ofnew work----------..........--................---------------------------------------------                $3, 943. 15
Cost of maintenance--------------------
Total expended-----        --------------          ----------------------------------------                        3,825. 91
Allotted-....--------------------     --------------------------------                             ----------- 355, 000. 00


Amount allotted from National Industrial Recovery Act approved
  June 16, 1933---------       ---------------------------        $355, 000. 00
Gross amount expended--____________________                ______    3, 825. 91
Balance unexpended June 3(. 1934 --------------------             - 351, 174.09
Outstanding liabilities June 30, 1934_-------------- $117.24
Amount covered by uncompleted contracts ---------     182, 200. 00
                                                                    182, 317.24
         Balance available June             :0. 1934_-..............--
                                                                  __ 168, 856. 85
Amount (estimated) required to be appropriated for completion
of Public Works Administration project 1_- - - - _________
                                                   ,
                                                                                                             300, 000. 00

  1   Exclusive of available funds.
                 RIVERS AND IIARBORS-BUFFALO,                                            N. Y., DISTRICT                  1183
       CO)NSOLIDATED         COST AND FINANCIAL SUMMARY FOR FAIRPORT HARBOR,                                          OHIO

Cost of new work to June 30, 1934------------------------ $1, 942, 952. 12
Cost of maintenance to June 30, 1934------------------------- 420, 860. 78
     Total cost of permanent work to June 30, 1934__-___-  2, 363, 812. 90
Minus accounts payable June 30, 1934------------------------       214.43

     Net total expenditures---------------------------- 2, 363, 598. 47
Unexpended balance June 30, 1934--------------------------- 360, 252. 45

          Total amount appropriated to June 30, 1934-------------                                             2, 723, 850. 92

    Fiscal year ending June 30                   1930                1931                1932         1933              1934


Cost of new work-.__.                __--_____                   $260, 163. 65
                                                             -______              $378, 903. 49     $52, 267. 74       $52, 623. 18
Cost of maintenance .        - -.....      -.. $7, 044. 57           6, 160. 33     12, 480. 56       7, 933. 88        19, 796. 43
       Total cost-----------------.....         7, 044. 57        266, 323. 98     391, 384. 05     60, 201. 62         72, 419. 61
Total expended ...........          ___         7, 127. 83        164, 086. 36     492, 274. 77     56, 522. 39         76, 943. 37
Allotted__._. ---.      ----__     _-_--      12, 500. 00         650, 000. 00    -10,     932.86   106, 703. 47       385, 955. 78


Balance unexpended July 1, 1933-------     ------------------- $51, 240. 04
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934----------------------- $8, 200. 00
Amount allotted from War Department Appropriation
Act approved July 14, 1932----------------------       1 755. 78
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933---------------------- 21, 000. 00
Amount allotted from National Industrial Recovery Act
approved June 16, 1933------------------_______-     355, 000.00
                                                                  385, 955. 78

      Amount to be accounted for--             ---------------------- 437, 195. 82
Gross amount expended     ------------------------ $77, 002.26
Less reimbursements collected ------------------------            58. 89
                                                                         76, 943. 37

      Balance unexpended June 30, 1934-------------------- 360,252. 45
Outstanding liabilities June 30, 1934 ------------------    $214. 43
Amount covered by uncompleted contracts ----------       182,200. 00
                                                                     182, 414. 43

          Balance available June 30, 1934 _---_________________                                                    177, 838. 02

Amount (estimated) required to be appropriated for completion
                     - ------ ------ - - - - - - - - - - - - - - - - - - - - ---
of P. W. A. project                                                             300, 000. 00

Amount that can be profitably expended in fiscal year ending                   June
30, 1936, for maintenance
                            - -
                                -- -- -- - - - - - - - - - - - - - - - -- - - - --                                 30, 500. 00

                                  6. ASHTABULA HARBOR, OHIO

  Location.-On the south shore of Lake Erie, at the mouth of the
Ashtabula River, 59 miles easterly from Cleveland, Ohio. (See
U. S. Lake Survey Chart No. 3.)
  1 Exclusive of available funds.




        91536-ENG 1934--75
1184   REPORT OF CHIEF     OF ENGINEERS,    U.   S. ARMY,   1934

    Previous projects.-Adopted by River and Harbor Acts of May
20, 1826, and March 3, 1829; July 3, 1832; March 2, 1867; June 10,
1872; March 3, 1881; and July 8, 1890. The total cost and expendi-
tures were $565,192.27 for new work and maintenance (not sep-
arable). For further details see page 1963 of Annual Report for
1915.
    Existing project.-This provides for an outer harbor about 175
acres in area and 20 feet deep, protected by breakwaters, the west
breakwater 7,180 feet long, the new east breakwater 4,500 feet long,
with an entrance 600 feet wide between pierheads and removal of 600
feet of the outer end of the old east breakwater and of such addi-
tional part as may be necessary. The breakwaters, except about 430
feet of the west one, which has a timber-crib substructure, are
rubble-mound . structures. The pierheads are stone-filled timber
cribs with concrete superstructures.
    The project depth is referred to low-water datum for Lake Erie,
which is taken at 570.5 feet above mean tide level at New York.
Ordinary fluctuations of water level are between 3 feet above and
0.5 foot below low-water datum, and extreme fluctuations, produced
by winds or other causes, are from 4 feet above to 1 foot below low-
water datum.
    The estimate of cost for new work, revised in 1919, is $1,933,529,
exclusive of amount expended on previous projects. The latest
  (1928) approved estimate for annual cost of maintenance is $8,000.
    The existing project was authorized by the following river and
harbor acts: The act of June 3, 1896, provided for the breakwaters
  (Annual Report for 1895, p. 8122); the act of March 3, 1905, pro-
vided for extending the west breakwater shoreward (no printed re-
port); the act of June 25, 1910, provided for enlarging the outer
harbor by extending the west breakwater lakeward and shoreward
and by constructing a new east breakwater, for pierheads, and for
the removal of a part of the old east breakwater (H. Doc. No. 654,
61st Cong., 2d sess.); and the act of March 2, 1919, provided for
connecting the west breakwater with the shore and for dredging in
the outer harbor (H. Doc. No. 997, 64th Cong., 1st sess.). For the
latest published map see the latter document, and House Document
No. 43, Seventy-third Congress, first session.
    Supplementing the work authorized by Congress, the lakeward
extension of the east breakwater, 700 feet, and of the west breakwater,
600 feet, and the removal of the portion of the existing east break-
water within the new entrance, as recommended by the Chief of
Engineers in House Document No. 43, Seventy-third Congress, first
session, has been included in the Public Works program under the
National Industrial Recovery Act.
    Recomamended modifications of project.-Under date of Decem-
ber 19, 1932, the Chief of Engineers recommended modification of
the existing project so as to provide for a depth of 25 feet in soft
material and 26 feet in hard material in a certain portion of the.
outer harbor and to the inner limits of dredging; for extending the
  west breakwater lakeward 600 feet and constructing a converging
  arm 700 feet long from the east breakwater, each terminating in
  suitable pierheads; and for removing the portion of the east break-
  water within the new entrance so formed, all at an estimated cost
  of $925,000, with maintenance estimated at $1,000 per annum in
         RIVERS AND HARBORS-BUFFALO,         N.   Y.   DISTRICT   1185
addition to that now required, subject to certain conditions of local
cooperation (H.Doc. No. 43, 73d Cong., 1st sess.).
   The breakwater construction is included in the Public Works
program.
   Terminal facilities.-Extensive ore and coal terminals are owned
by the New York Central Railroad Co. along the east side of the
river and the slip 1,000 feet easterly thereof, and by the Pennsyl-
vania Railroad Co. along the west side of the river. These comprise
3 ore and 2 coal docks equipped with mechanical appliances and
are open for general public business. These railroads have an aggre-
gate developed dock frontage of 18,500 feet. Two terminals, one
on each side of the river, provide facilities for car ferries which ply
between Ashtabula and Port Burwell and Port Maitland, Ontario,
Canada. There are two privately owned fish docks and a large ship-
yard and drydock. The city of Ashtabula owns 132 feet of dock on
the east side of the river which can accommodate small boats and is
open to the public. The terminal facilities are regarded as adequate
for the needs of existing commerce.
   Operations and results during fiscal year.-The United States
hopper dredge Burton restored the project depth in the entrance
channel and westerly end of the east basin. Cost $8,861.94. Govern-
ment plant and hired labor made minor repairs to 515 feet of the
breakwaters. Cost $6,255.29.
   The total cost of maintenance for the fiscal year was $15,117.23,
and the expenditure was $16,895.56. All from regular funds.
   Under authority of the Federal Emergency Administration of
Public Works contract operations were begun on the extension for
the breakwater system. The construction of the new lighthouse
foundation was in progress at the end of the year.
   The cost of this new work for the fiscal year was $1,291.51, and
the expenditure was $768.57.
   Condition at end of fiscal year.-The existing project is 92 percent
completed. Under the existing project as first adopted a west
breakwater 3,380 feet long and an east breakwater 1,200 feet long
were built, affording an outer harbor of limited area. Under the
provisions of the River and Harbor Acts of June 25, 1910, and
March 2, 1919, the west breakwater was extended shoreward and lake-
ward to an aggregate length of 7,180 feet; a new outer east break-
water 4,500 feet long was built; the east and west breakwaters were
terminated with pierheads at their outer ends; and the outer 600 feet
of the old east breakwater was removed. The breakwater and pier-
heads were completed in 1915 and the extension of west breakwater to
shore, provided by River and Harbor Act of March 2, 1919, in 1923.
Deepening the westerly 800 feet of the east basin was completed in
1933. The harbor works are generally in good condition. The
controlling depth in the entrance channel is 20 feet.
   The work remaining to be done is to deepen a portion of the outer
harbor to 20 feet and complete the removal of the east inner break-
water provided for conditionally without estimate.
   The total cost of the existing project to the end of the fiscal year
was $2,093,219.40, of which $1,769,457.27 was for new work and
$323,762.13 for maintenance. The total expenditure was $2,093,-
186.68.
1186         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 193 4

    The work authorized by the Public Works Administration is
one-tenth percent completed. Extension lakeward of the east break-
water 700 feet and the west breakwater 600 feet, removal of 800
feet of the east breakwater and 350 feet of the inner breakwater and
deepening the outer harbor west of a meridian line through a point
800 feet east of the westerly end of the east breakwater to a depth
of 25 feet in soft material and 26 feet in hard material remain to
be done to complete the work authorized.                                           All but deepening the
outer harbor is now under contract.
  The total cost of this new work to the end of the fiscal year was
$1,291.51. The total expenditure was $768.57.
   The total cost, all funds, was $2,094,510.91, of which $1,770,-
748.78 was for new work and $323,762.13 for maintenance.                                                            The total
expenditure was $2,093,955.25.
  Proposed operations.-The balance unexpended at the end of the
year will be applied as follows:
Regular funds: Accounts payable, June 30, 1934 ...----                                                                     $32. 72
Maintenance: Dredging by U. S. hopper dredge Burton, April 1935___ 8, 568.31
          Total funds _____                    -_________                                                             8, 601.03
   The balance unexpended of allotment from the National Indus-
trial Recovery Act, $430,231.43, will be applied to completion of
extending the east breakwater 700 feet and west breakwater 600
feet with pierhead and removing a portion of the present east
breakwater and inner breakwater, by contract in force July 1934
to November 1935.
   Redredging is required annually and minor repairs to breakwaters
are necessary. For these items of maintenance, funds can be profit-
ably expended during the fiscal year 1936 as follows:
Dredging by U. S. hopper dredge Burton_----                                                                         $12, 300. 00
Minor repairs to breakwaters by U. S. derrick boat Erie                                           _            -_     8, 000. 00
          Total __        ________                   -________-_
                                                            -_                                           --          20, 300.00

                                     Cost and financial summary
                             MAINTENANCE         AND       IMPROVEMENT               FUNDS


Cost of new work to June 30, 1934 _________-                                                                  $2,334, 649'. 54
Cost of maintenance to June 30, 1934- -------------------
                                        _                                                                        323, 762. 13

         Total cost of permanent work to June 30, 1934                                      ---   _--          2, 658, 411. 67
Minus accounts payable, June 30, 1934------------------------                                                               32. 72

     Net total expenditures-----------------------------                                                       2, 658, 378.95
Unexpended balance, June 30, 19.34----------------------------                                                      8, 601. 03

         Total amount appropriated to June 30, 1934--------------2, 666, 979.98

         Fiscal year ending June 30                 1930              1931                1932           1933               1934


Cost of new work .-------------------------                     --------------------...               $31, 808. 53     -       -
Cost of maintenance----------     ----------     $19, 971. 94     $91, 762. 39     $24, 200. 33        23, 630. 34      $15, 117. 26
       Total cost            ----------           19,971. 94       91, 762. 39      24, 200. 33        55, 438. 87         15, 117. 23

               ----------------------
Total expended-_                                  20, 742. 63      95, 188. 93      24, 289. 58        53, 627. 82         16, 895. 56
Allotted.....----------------------              106, 800. 00      18, 500. 00       2,723. 98         70, 715. 88          8,408. 53
                RIVERS AND HARBORS-BUFFALO,                                     N. Y., DISTRICT                       1187
Balance unexpended July 1, 1933 ---------------------------- $17, 088. 06
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934__------_________    -   $6, 600. 00
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933----------------------- 7, 000. 00
                                                                13, 600. 00
      Amount to be accounted for_-      -___- ______-___ ____                                                    30, 688. 06
Deductions on account of revocation of allotment___-.-,__- ____                                                   5, 191. 47
      Net amount to be accounted for               __
                                                    _,____-                                                      25, 496. 59
Gross amount expended     -----------------------------------                                                    16, 895. 56
      Balance unexpended June 30, 1934__________-                                    ________                     8, 601.03
Outstanding liabilities June 30, 1934 __________                                   _______1               1__         32. 72
         Balance available June 30, 1934______- ___ -- _____-____                                                 8, 568. 31
Amount (estimated) required to be appropriated for completion of
existing project 1_____________-___                             19+5, 000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1____________________________________                                                 20, 300. 00
                                         PUBLIC WORKS FUNDS

Cost of new work to June 30, 1934__._________---                                 ______-___               _      $1, 291. 51
Cost of maintenance to June 30, 1934___
      Total cost of permanent work to June 30, 1934________                                              __       1', 291.51
                                         -
Minus accounts payable June 30, 1934_--__-    -------  ____                                               _--         522. 94

     Net total expenditures----------------------------------    768. 57
Unexpended balance June 30, 1934_______ ___________________ 430, 231. 43

        Total amount appropriated to June 30, 1934_______________                                             431, 000. 00

        Fiscal year ending June 30                   1930           1931            1932            1933             1934


Cost of new work-__-------                ---------------------------------                     ------------        $1,291.51
Cost of maintenance--------              ---------------------------------------------                               --
Total expended      .-------------------- ---                         -768.                                                 57

Allotted -------
           ..        ----                       --          -----          --    -----             ---             431,000. 00


Amount allotted from National Industrial Recovery Act approved
  June 16, 1933--------------------------------------       -- $575, 000. 00
Deductions on account of revocation of allotment --   __-____-_144, 000. 00

      Net amount to be accounted for                                       ---------                            431, 000. 00
Gross amount expended__-----                                                     ------------                        768. 57

     Balance unexpended June 30, 1934___________--          ___430, 231. 43
Amount covered by uncompleted contracts_______________________  428, 231.43

        Balance available June 30, 1934_______--------------                                                      2, 000. 00

Amount (estimated) required to be appropriated for completion
of Public Works Administration project 1---       -----                                                        319, 000. 00

  1 Exclusive      of available funds.
1188         REPORT OF CHIEF OF ENGINEERS,                           U. S. ARMY,              1934

    CONSOLIDATED COST AND FINANCIAL                  SIUMMARY FOR ASHTABULA              HARBOR,        OHIO

Cost of new work to June 30, 1934--------------------------                                   $2, 335, 941.05
Cost of maintenance to June 30, 1934_--------- ----                                               323,762. 13

     Total cost of permanent work to June 30, 1934 -------                                     2, 659, 703. 18
Minus accounts payable June 30, 1934------------------------                                           555. 66

     Net total expenditures___
                            --------------------------------                                   2, 659, 147. 52
Unexpended balance June 30, 1934--------------------------                                        438, 832.46

           Total amount appropriated to June 30, 1934------------3, 097, 979. 98

   Fiscal year ending June 30           1930            1931           1932            1933              1934


Cost of new work ................_                                                   $31, 808. 53        $1,291. 51
Cost of maintenance------------   $19, 971. 94        $91, 762. 39   $24, 200. 33     23, 630. 34        15, 117. 23

      Total cost----------------       19, 971. 94     91, 762. 39    24, 200. 33     55, 438. 87        16, 408. 74
Total expended....-----------------    20, 742. 63     95, 188. 93    24, 289. 58     53, 627. 82        17, 664. 13

Allotted    ---------------------
            _                         106, 800. 00     18, 500. 00     2, 723. 98     70, 715. 88       439, 408. 53


Balance unexpended July 1, 1933-----------------------------       $17, 088. 06
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934------------------------- $6,600. 00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933----------------              7,000. 00
Amount allotted from National Industrial Recovery Act
  approved June 16, 1933-----------------------       575, 000. 00
                                                                   588, 600. 00

      Amount to be accounted for ___--                                         ---       __         605, 688. 06
Deductions on account of revocation of allotment                                                     49,191. 47
                                                                                                    1-------------

      Net amount to be accounted for------------------ --                                           456, 496. 59
Gross amount expended---------------------------------                                               17, 664. 13
      Balance unexpended June 30, 1934--------------------438, 832. 46
Outstading liabilities June 30,1934_   -              $32. 72
Amount covered by uncompleted contracts----------428, 231.43
                                                              428, 264. 15

           Balance available June 30, 1934-_                                                         10, 568. 31

Amount (estimated) required to be appropriated for completion of
the improvement----
                   _   --------------------- __                  514, 000.00

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1 _____________________________                                           20, 300. 00

                                7. CONNEAUT HARBOR, OHIO

   Locaition.-On the south shore of Lake Erie, at the mouth of the
Conneaut River, 73 miles easterly from Cleveland, Ohio. (See U. S.
Lake Survey Chart No. 3.)
   Previous projects.-Adopted by River and Harbor Acts of March
2, 1829, July 13, 1892, February 24, 1893, and March 24, 1896. The
total cost and expenditures were $845,055.69, of which $805,271.72
was for new work and $39,783.97 was for maintenance after 1903.
 (For further details see p. 1964 of Annual Report for 1915.)
   1Exclusive    of available funds.
          RIVERS AND HARBORS-BUFFALO,            N.   Y.2 DISTRICT      1189
   Existing project.-This provides for the construction of 2 con-
verging breakwaters to form an outer harbor about 200 acres in
extent, the west breakwater, of rubble-mound construction, to be
4,700 feet long and the east one 2,750 feet long (1,700 feet of rubble
mound and 1,050 feet of timber crib with concrete superstructure),
the pierheads at the outer end of each breakwater to be 600 feet
apart; 2 timber-and-concrete piers at the mouth of the Conneaut
River, 200 feet apart for the outer 428 feet and widening to 300 feet
apart at the inner end of the west pier, the east pier 1,467 feet long
and the west pier 1,073 feet, of which only the outer 300 feet is now
maintained by the United States; for removing the old west break-
water and for dredging the outer harbor and between the piers to the
inner end of the west pier to a depth of 20 feet.
   The project depth is referred to low-water datum for Lake Erie,
which is taken at 570.5 feet above mean tide level at New York.
Ordinary fluctuations of water level are between 3 feet above and 0.5
foot below low-water datum, and extreme fluctuations, produced by
wind and other causes, are from 4 feet above to 1 foot below low-
water datum.
   The estimate of cost for new work, revised in 1926, is $1,164,000,
exclusive of amounts expended on previous projects. The latest
 (1916) approved estimate for annual cost of maintenance is $10,000.
The existing project was adopted by the following River and Har-
bor Acts: The act of July 13, 1892, provided for relocating the
channel and the construction of new piers; these provisions were
voided by the act of February 24, 1893, which provided for widen-
ing and deepening of the existing old channel in lieu thereof; the act
of June 25, 1910, provided for the breakwaters and pierheads and
the removal of a portion of the old west breakwater (H. Doc.
No. 653, 61st Cong., 2d sess.); and the act of August 8, 1917, pro-
vided for the present alinement of the west breakwater, for remov-
ing all the old west breakwater, and for dredging to 20 feet (H. Doc.
No. 983, 64th Cong., 1st sess.). For the latest published map see the
last-mentioned document, and House Document No. 48, Seventy-
third Congress, first session.
   Supplementing the work authorized by Congress, the following
modifications recommended by the Chief of Engineers in House
Document No. 48, Seventy-third Congress, first session, have been
included in the Public Works program under the National Indus-
trial Recovery Act:
   Extending the west breakwater 830 feet, and the east breakwater 925 feet
lakeward, with a suitable pierhead at the outer end of each, and removing
the present outer arm of the west breakwater.
   Extending the west breakwater to shore, leaving a 100-foot gap at the
inner end of the present structure.
  Removing the outer 428 feet of the east and west piers.
  Recommended modifications of project.-Under date of December
15, 1932, the Chief of Engineers recommended further improvement
of Conneaut Harbor so as to provide-
   (a) A depth of 25 feet in soft material and 26 feet in hard material in the
eastern part of the outer harbor, subject to certain conditions of local
cooperation.
   (b) Extending the west breakwater 830 feet, and the east breakwater 925
feet lakeward, with a suitable pierhead at the outer end of each, and removing
the present outer arm of the west breakwater.
1190    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,               1934

   (0) Extending the west breakwater to shore, leaving a 100-foot gap at the
inner end of the present structure, subject to certain conditions of local
cooperation.
  (4) Eliminating from the project the present authorization for extending the
west breakwater 255 feet shoreward.
   (e) Removing the outer 428 feet of the east and west piers and modifying
correspondingly the inner limit of dredging in the outer harbor, all at an
estimated cost of $1,650,000, but with a net increase of $1,604,000 over the
estimated cost of completing the present project and with maintenance esti-
mated at $1,500 annually in addition to that now required.    (H. Doc. No. 48,
73d Cong., 1st sess.). Breakwater construction and extension (items (b) and
(c) included in Public Works program.
   Local cooperation.-Deed conveying without cost to the United
States the necessary land for the shore connection of the west break-
water, as required in connection with project modifications included
in the Public Works program, was accepted by the Chief of Engi-
neers October 23, 1933.
   Terminal facilities.-The railroad and dock companies have ob-
tained and maintained a channel in Conneaut River 20 feet deep at
low-water datum from the upper limit of the Federal project to. a
point about 3,000 feet above the outer ends of the piers. There are
about 6,800 feet of improved dock frontage, part of which is owned
by the Pittsburgh, Bessemer & Lake Erie Railroad Co., and the bal-
ance by the Pittsburgh & Conneaut Dock Co., both subsidiary com-
panies of the United States Steel Corporation. One dock has been
reconstructed and the channel widened south of the inner end of
west pier. There is one fish dock in the outer harbor just west of the
river mouth. There is no publicly owned dock at the harbor. The
privately owned terminals are regarded as adequate for the needs
of existing commerce.
   Operationsaind results duringfiscal y'ear.-The U. S. hopper dredge
Burton restored the entrance channel to project depth. Cost
$6,946.79. Government plant and hired labor made minor repairs
to the breakwaters. Cost $971.96, and removed a shoal in the west
basin of the outer harbor. Cost $427.73.
   The total maintenance cost for the fiscal year was $8,346.48, and
the total expenditure was $9,870.76, all from regular funds.
   Under authority of the Federal Emergency Administration of
Public Works operations were in progress during a part of the fiscal
year extending the west breakwater to shore by contract. Cost $232,-
754.01; removal of the outer ends of the piers, removal of the lake
arm of the west breakwater, and extending the east and west break-
waters lakeward, by contract. Cost $112,498.05. The work is about
37 percent completed.
   The total cost of this new work for the fiscal year was $345,252.06,
and the expenditure was $301,879.14.
   Condition at end of fiscal yearr.-The existing project is 93 percent
completed. Under existing project a length of 4,445 feet of the new
west breakwater was completed in 1916; the old east breakwater,
1,050 feet long, has been extended shoreward 800 feet (completed
1911) and lakeward 900 feet (completed 1923), total length 2,750
feet; 642 feet of the old west breakwater was removed in 1916 and
the remaining 600 feet in 1925. Two piers have been constructed at
          RIVERS AND HARBORS-BUFFALO,           N.   Y., DISTRICT     1191

the mouth of the Conneaut River. The east pier is 1,467 feet long
and the west pier 428 feet long. Only the outer 300 feet of the west
pier is maintained by the United States. The entrance channel
through the outer harbor and between the piers was dredged to 20
feet in 1919. The channel between the piers is maintained by the
United States only to 300 feet southerly of the outer end of the west
pier. The harbor structures were generally in good condition. The
rubble-mound breakwaters require minor repairs. The controlling
depth in the west basin and in the channel through the outer harbor
and between the piers was 20 feet. The work remaining to be done
to complete the project is the construction of 255 linear feet shore-
ward extension of west breakwater and complete deepening to 20 feet
the remainder of the outer harbor.
    The total cost of the existing project to the end of the fiscal
year was $1,236,579.22, of which $1,080,686.47 was for new work
and $155,892.75 for maintenance.        The total expenditure was
 $1,236,211.03.
   The work authorized under the Public Works Administration is
21 percent completed. The extension of the west breakwater 1,670
feet to shore is about 98 percent completed. Work remaining to be
done to complete that authorized is completion of the west break-
water extensions to shore and 780 feet lakeward; removal of the lake
arm of the west breakwater,. 980 feet long; extension of the east
breakwater 925 feet lakeward; completion of the removal of the
outer ends of the east and west piers; and deepening the eastern part
of the outer harbor to 25 feet in soft material and 26 feet in hard
material. All work except deepening the outer harbor is now under
contract.
   The total cost of this new work -to the end of the fiscal year was
$345,252.06. The total expenditure was $301,879.14. The total cost,
all funds, was $1,581,831.28, of which $1,425,938.53 was for new
work and $155,892.75 for maintenance. The total expenditure was
$1,538,090.17.
   Proposed operations.-The balance unexpended at the end of the
year will be applied as follows:
Regular funds: Accounts payable June 30,-1934 _-------------        $368. 19
Maintenance: Dredging by U. S. hopper dredge Burton October 1934,
May 1935-- ------------------------------------------------- 16, 416. 14
     Total funds___________________________
               Tota funs---------------------------------------1616,784.
                                                                     8.3 33
  The balance unexpended, of allotment from the National Industrial
Recovery Act, $625,120.86, will be applied to completion of work of
extending the east breakwater approximately 925 feet and the west
breakwater approximately 780 feet with pierhead; constructing
shore arm to west breakwater; removing the outer arm of the west
breakwater and the ends of the piers, by contracts in force July
1934 to November 1935.
  Redredging is required annually and the sum of $14,700 can be
profitably expended during the fiscal year 1936 in maintenance
dredging by U. S. hopper dredge B'urton.
1192         REPORT OF CHIEF OF ENGINEERS,                                        U. S. ARMY, 1934

                                        Cost and financial summary
                              MAINTENANE AND IMPROVEMENT                                  FUNDS

Cost of new work to June 30, 1934__________________________                                                          $1, 885, 958. 19
Cost of maintenance to June 30, 1934__--___-----------                                                               - 195, 676. 72
     Total cost of permanent work to June 30, 1934_...........                                                       2, 081, 634. 91
Minus accounts payable June 30, 1934-- __-...___    __      __-                                                              368. 19

     Net total expenditures_________________                                                                          22,081, 266. 72
Unexpended balance June 30, 1934      .____----------------                                                               16, 784. 33

         Total amount appropriated to June 30, 1934_.----------                                                       2, 098, 051. 05

   Fiscal year ending June 30              1930                 1931                    1932              1933               1934
     of new0work93
CoSd~lilgnJ                                                                                              1
Cost of new work___.....
Cost of maintenance......--
                              ___.__.
                               ...        $4, 823. 72
                                                               $1,564.76
                                                                6, 365. 36
                                                                                  $42, 887. 19 -------------
                                                                                    4, 750. 31
                                                                                                          -
                                                                                                  $27, 348. 64
                                                                                                                          -----------
                                                                                                                            $8, 346. 48

      Total cost...............            4, 823. 72           7, 930. 12         47, 637. 50           27, 348. 64          8, 346. 48

Total expended.................            8, 933. 70           7, 156. 23         48, 848. 67           25, 704. 09          9, 870. 76

Allotted--.......-----------------        11, 000. 00          60, 000. 00       -15,     000. 00        24, 891. 22         22, 500. 00



Balance unexpended July 1, 1933__----------------------      __                                                           $4, 155. 09
Amount allotted from War Department Appropriation Act approved
Mar. 4, 1933-----    --------------------------------------                                                              22,500. 00

      Amount to be accounted for_ .-..          ---.
                                        _______--------                                                                   26, 655. 09
Gross amount expended-------       --------------                                                                          9,870. 76
      Balance unexpended June 30, 194 __--    ____------------- - 16, 784. 33
Outstanding liabilities June 30, 1984---------------------------      368. 19
         Balance available June 30, 1934--__---                                    ___--__----- -                -        16, 416. 14

Amount (estimated) required to be appropriated for completion of
                                        - - - - - - - - - - - - - - - - - - - - - - - -- - -
existing project 1 - - - - - - - - - -                                                                                   83, 300. 00
Amount that can be profitably expended in fiscal year ending June
                                 -- - -- - -- - -- - -- - -- - -- - -- - --
30, 1936, for maintenance 1__                                                                                           14, 700. 00

                                           PUBLIC WORKS FUNDS

Cost of new work to June 30, 1934 .. ________---    ________   $345, 252. 06
Cost of maintenance to June 30, 1934    ____________________ __

     Total cost of permanent work to June 30, 19834___-                                                                 345, 252. 06
                                                                                                                     -____
Minus accounts payable June 30, 1934 ---- _---------------                                                               43, 372. 92
     Net total expenditures_ ........    ____ __-__-_                                                          301, 879. 14
Unexpended balance June 30, 1934 ___-__-      ____-- __                                               _____---625, 120. 86
         Total amount appropriated to June 30, 1934______________                                                       927, 000. 00

         Fiscal year ending June 30                     1930            1931                   1932          1933             1934


Cost of new work....                                                                                                    $345, 252. 06
                                                                             ..--------------..---------------------------------
                                                                                                                   -
Cost of maintenance--------------------------                          ------------------------

Total expended            --------------------------------------------------------                                          301,879. 14
Allotted------------------------------                           ----------- ----------                  ------------ 927, 000. 00

   1 Exclusive of available funds.
                 RIVERS AND HARBORS--BUFFALO,                                N. Y., DISTRICT                   1193
Amount allotted from National Industrial Recovery Act approved
  June 16, 1933--------------------------------------          $1, 077,000. 00
Deductions on account of revocation of allotment_------- -----     150, 000. 00

      Net amount to be accounted for_______----------                                                    927, 000. 00
Gross amount expended--------- ------------------------                                                  301, 879. 14

     Balance unexpended June 30, 19344                                                                   625, 120. 86
Amount covered by uncompleted contracts_____________                                                     623,388.42

         Balance available June 30, 1934                                      ___1---------1,                  732. 44
                                                                                                           1..._____

Amount (estimated) required to be appropriated for completion
of Public Works Administration project 1____________________                                            585, 600. 00

      CONSOLIDATID COST AND FINANCIAL SUMMARY FOR, CONNFAUT HARBOR, OHIO,

Cost of new work to June 30, 1934------------------------ $2,231,210. 25
Cost of maintenance to June 30, 1934_     -____---________ 195, 676. 72

      Total cost of permanent work to June 30, 1934_ -____- -                                      2, 426, 886. 97
Minus accounts payable June 30, 1934_ ..-    __----------     -                                        43, 741.11

     Net total expenditures ----------------------------                                           2, 383, 145. 86
Unexpended balance June 30, 1934____ -----------                                                      641, 905. 19

          Total amount appropriated to June 30, 1934---------                                      3, 025, 051. 05

    Fiscal year ending June 30                   1930         1931            1932          1933              1934

Cost of new work__....._____----------------_                $1, 564. 76   $42, 887. 19 --------            $345, 252. 06
Cost of maintenance ...-......
                            _       $4, 823. 72               6, 365 36      4,750.  31    $27, 348.
                                                                                                   64          8,346.  48
       Total cost---..----.........----------.   4, 823.
                                                       72     7, 930. 12    47, 637. 50    27, 348. 64       353, 598. 54
Total expended-----------------8,                  933. 70    7, 156. 23    48, 848. 67    25, 704. 09       311, 749. 90
Allotted-- _------.
            .              -------          - -11,000. 00    60, 000. 00   -15, 000. 00    24, 891. 22       949, 500. 00


Balance unexpended July 1, 1933 _--______________-        ___- _                                          $4, 155. 09
Amount allotted from War Department Appropria-
  tion Act approved Mar. 4, 193_-----------------$22, 500. 00
Amount allotted from National Industrial Recovery
  Act approved June 16, 1933 -----------------    1, 077, 000. 00
                                                                                                    1, 099, 500. 00
                                         -____
      Amount to be accounted for_______________                 1,103, 655.09
Deductions on account of revocation of allotment---------------    150, 000. 00

      Net amount to be accounted for_--_------------                                                     953, 655. 09
Gross amount expended_ _- --------------                                                                 311, 749. 90

      Balance unexpended June 30, 1934----                                                                41, 905. 19
                                                                                                         6---------------
Outstanding liabilities June 30, 1934_-........ __.                                     $368. 19
Amount covered by uncompleted contracts---------                                     623,388. 42
                                                                                                         623, 756. 61

          Balance available June 30, 1934.---__.--.------------                                           18, 148. 58

Amount (estimated) required to be appropriated for completion
of the improvement -----------------------------------                                                  668, 900. 00

Amount that can be profitably expended in fiscal year ending June
   30, 1936, for maintenance --------------------------------                                              14, 700. 00

   2Exclusive         of available funds.
1194    REPORT   OF CHIEF OF ENGINEERS, U.      S. ARMY, 1934

                         8. ERIE HARBOR, PA.

   Looation.-On the southerly side of the bay formed by Presque
Isle Peninsula, on the south shore of Lake Erie, 78 miles westerly
from Buffalo, N. Y. (See U. S. Lake Survey Charts Nos. 3 and 332.)
   Previous projects.-Adopted by River and Harbor Act of May 26,
1824, and modifications were subsequently made by approval of the
report of a board of engineers in 1855 and in 1865; by the act of
March 2, 1867; by approval of the report of a board of engineers
in 1870; and by River and Harbor Acts of August 5, 1886, and Sep-
tember 19, 1890. The cost and expenditures were $841,867.43, of
which amount $736,967.04 was for new work and $104,900.39 for
maintenance since 1887. For further details see page 1965 of Annual
Report for 1915.
   Existing projeot.-This provides for an entrance channel 20 feet
deep and 300 feet wide, about 9,000 feet long from lake to harbor
basin, passing between piers 360 to 450 feet apart, of the timber-crib
type, with concrete superstructure, extending to the 16-foot contour
in the lake, the north pier to have a length of about 3,248 feet, and
the south pier about 2,215 feet, further extensions lakeward when
required to meet advance of said contour; for a timber-crib break-
water 2,530 feet long, with about 1,200 linear feet of stone super-
structure, extending from the inner end of the south pier to the main-
land, thus closing the balance of the opening at the eastern end of the
harbor; for deepening the harbor basin over certain areas at the
east and west ends to 20 feet, and the basin off the public dock to 18
feet, and for plant growth and emergency protection work on the
peninsula.
   The project depths are referred to low-water datum for Lake Erie,
elevation 570.5 feet above mean tide at New York City. Ordinary
fluctuations of water level are from 3.5 feet above to 0.5 foot below
low-water datum, and extreme fluctuations, produced by wind and
other causes, are from 5.9 feet above to 2.7 feet below that plane.
   The estimate of cost for new work, revised in 1932, is $275,000,
exclusive of amounts expended on previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $15,000.
   The existing project was authorized by the following river and
harbor acts: The act of May 26, 1824, provided for the construction
of the breakwater and piers and dredging of the entrance channel
and for brushwood protection of the beach of Presque Isle Penin-
sula (document or report not known) ; acts of 1826 to 1852 and 1864
to 1896, inferentially provided for breakwaters, pier extensions, in-
creased channel dimensions, etc.; the act of March 3, 1899, pro-
vided for the deepening of channel and harbor basin to present
dimensions and for concrete superstructures and extensions of piers,
and for plant growth and emergency protection work on the penin-
sula (H. Doc. No. 70, 55th Cong., 1st sess., and Annual Report for
1897, p. 3237), as modified by act of June 25, 1910 (Rivers and Har-
bors Committee Doc. No. 26, 61st Cong., 2d sess.); and the act of
November 28, 1922 (Public, No. 366), reconveyed Presque Isle
Peninsula to the State of Pennsylvania for park purposes. The
latest published maps are in the Annual Report for 1911, page 2510.
   Recommended modifictions of project.-Under date of January 4,
1933, the Chief of Engineers recommended that the further improve-
         RIVERS AND HARBORS-BUFFALO,          N.   Y.,   DISTRICT   1195
ment of Erie Harbor, Pa., is advisable to provide for an entrance
channel 25 feet deep in soft material and 26 feet deep in hard ma-
terial, 500 feet wide lakeward of the entrance piers, and 300 feet wide
between: the piers and into the harbor on a straight alinement,; for
a channel of the same depths and 600 feet wide from the entrance
channel to a line 50 feet outside of the pierhead line at the ore termi-
nal, suitably widened at the junction with the entrance channel; for
a harbor area 21 feet deep, and with an area of approximately 117
acres, extending to a line 50 feet outside the bulkhead line in the east-
ern part of the harbor; for a channel of the same depth and 300 feet
wide connecting this harbor area with natural deep water in the bay;
and for a channel 21 feet deep and 200 feet wide leading to a line 50
feet outside of the harbor line at the westerly coal docks; and elimi-
nation of the north breakwater and the southerly 1,330 feet of the
south breakwater from the project works; at an estimated cost of
$377,000, with maintenance estimated at $5,000 annually in addition
to that now required, subject to certain conditions of local coopera-
tion. (H. Doc. No. 52, 73d Cong., 1st sess.)
    Terminal facilities.-The developed water front has a length of
about 2 miles, extending from the foot of Parade Street at the east
end to foot of Cascade Street at the west end. Two groups of ter-
minals have been established along this harbor frontage and within
the United States harbor line, which is located about 1,800 feet be-
yond the shore line. The westerly group of terminals consists of
three piers. One is equipped with a car dumper for the shipment of
soft coal, but has not been used for several years. In addition there
is a sand wharf for storage and shipment of building sand dredged
from Lake Erie and a soft-coal fuel wharf. This is for fueling
small excursion steamers, fish, and other tugs. The facilities are
considered adequate for existing commerce. For further details see
page 1578, Annual Report for 1932.
    Operations and results during fiscal year.-The U. S. hopper
dredge Burton deepened the entrance channels and easterly part of
the basin.
    The total cost of maintenance for the fiscal year was $6,609.11, and
the expenditure was $6,504.98.
    Condition at end of fiscal year.-The existing project is 88 percent
completed. The Presque Isle Peninsula has been reconveyed to the
State of Pennsylvania for park purposes.
    The dredging was completed in 1911 and the breakwaters and
piers in 1915. There is now a harbor basin with a depth of 16 to
20 feet, with an entrance channel at, its easterly end 300 feet wide,
and 20 feet deep at low-water datum, protected by the two piers and
the south breakwater. Rubble-mound shore protection works about
3,000 feet long and a steel-pile bulkhead faced with stone have been
constructed along a part of the neck of Presque Isle Peninsula for
the protection of the harbor. The bulkhead is 5,662 feet long, in-
cluding shore returns, with 5,052 feet stone faced. The harbor
structures are generally in good condition. A section of the north
pier shows considerable settlement. The south breakwater is 2,530
feet long, 1,330 feet of which are not maintained. The north break-
water has not been maintained and is no longer considered necessary
in the interest of commerce and navigation.
 1196               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                     19 3 4

   The work remaining to be done to complete the project is the re-
location of the outer entrance channel and extension of the north
pier provided for, conditionally, without estimate.
   There is a controlling depth of 20 feet at low-water datum in
the outer and inner channels, and in the harbor basin leading to
the docks at the easterly end; 15 feet to coal docks at westerly end;
and 16.5 feet to the public dock, foot of State Street. The total cost
of the existing project to the end of the fiscal year was $1,399,468.26,
of which $244,380.01 was for new work and $1,155,088.25 for mainte-
nance. The total expenditure was $1,399,312.09.
   Proposed operations.-The balance unexpended at the end of the
year will be applied as follows:
Accounts payable June 30, 1934-_                    _ _ __            $156.17
Maintenance: Dredging by U. S. hopper dredge Burton, October 1934,
  May-June 1935-------------------------------------                27, 646. 30
              Total funds----                                --------------------------------                           27, 802.47
   The relocation of the outer entrance channel is considered desir-
able. Maintenance dredging is required annually. For these items
funds can be profitably expended during the fiscal year 1936 as
follows :
New work: Dredging new channel at outer entrance, by contract-- $20, 000
Maintenance: Dredging by U. S. hopper dredge Burton .     .--------------
                                                                    19, 000
              Total for all work__----------------------------------39, 000

                                                        Cost and financia summary

Cost of new work to June 30, 1934-------------------------$981, 347. 05
Cost of maintenance to June 30, 1934 ----------------------- 259, 988. 64                                          1,
     Total cost of permanent work to June 30, 1934--------- 2,241,335.69
Minus accounts payable June 30, 1934------------------------      156. 17

      Net total expenditures-----------------------------                                                          2, 241, 179. 52
Unexpended balance June 30, 1934            --------------                                                             27, 802.47

              Total amount appropriated to June 30, 1934------------                                               2, 268,981.99

      Fiscal year ending June 30                           1930              1931           1932           1933            1934


Cost of new work....---------------------------
Cost of maintenance ------------                        $71, 235. 54      $125, 306. 20   $19, 959. 77   $18, 042. 48      $6, 609. 11

Total expended...                        ...----------------
                                             ...            63, 828. 69    124, 927. 36    16, 200. 67    29, 894. 18       6, 504.-98

Allotted......................-------------------..     170, 500. 00        42, 500. 00   -5, 000. 00      9, 905. 43      32, 300. 00


Balance unexpended July 1, 1933   ------------------------------    $2, 007.45
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934---------------------- $26, 700. 00
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933--------------------------     5, 600.00
                                                                    42, 300. 00

      Amount to be accounted for    --------------------------                                                          44, 307. 45
Deductions on account of revocation of allotment---------------                                                         10,000. 00

              Net amount to be accounted for----------- ------------- 34, 307. 45
              RIVERS AND HARBORS-BUFFALO,                                 N.    Y.y DISTRICT                1197
Gross amount expended---------------------------- $6, 547.44
Less reimbursements collected-------------------------- 42. 46
                                                                                                        $6, 504. 98

      Balance unexpended June 30, 1934----    ----------------- 27, 802. 47
Outstanding liabilities June 30, 1934--------------------           156. 17

        Balance available June 30, 1934-----                           ------------------- 27, 646. 30

Amount (estimated) required to be appropriated                       for completion of
                    - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - --
existing project 1                                                                               20, 000. 00

Amount that can be profitably expended in fiscal year ending June
30, 1936 :     1- -      -- --- ------ ------ --- - - - - - - - - -- - -- - -- -
   For new work                                                                   20, 000. 00
                     - - - - - - -    - ---- --- ---- ---- --- - - - - - - - - --
   For maintenance 1                                                              19, 000.00
                 ----   - - - - - - - -   -- --- - - - - - - - - - - - - - - - - -   - - -- - -- - --
        Total                                                                                           39, 000. 00

                                  9. DUNKIRK HARBOR, N. Y.

   Location.-On the south shore of Lake Erie, 37 miles southwesterly
from Buffalo, N. Y. (See U. S. Lake Survey Charts Nos. 3 and 318.)
   Previous projects.-The original project was adopted by the river
and harbor act of March 2, 1827, and was modified by the river and
harbor act of March 2, 1867, by approval November 30, 1870, of the
report of a board of engineers, and by the river and harbor act of
June 3, 1896. The cost and expenditures under these projects prior
to the adoption of the existing project in 1910 were $987,770.25, of
which $811,249.94 was for new work and $176,520.31 for maintenance
since 1887. For further details of previous projects see page 1966
of Annual Report for 1915.
   Ewisting project.-This provides for an entrance channel 350 feet
wide at the lake end, narrowing to 200 feet at the breakwater, and
widening to 400 feet at the basin end, entering between a pier and
a breakwater, 270 feet apart; the pier on the west side to extend from
the shore for a length of about 1,410 feet and the breakwater on the
east side to be a detached structure 2,800 feet long; for a harbor
basin 2,400 feet long and 1,000 feet wide; channel and basin to be of
a depth suitable for vessels of 16 feet draft.
   The project depth is referred to low-water datum for Lake Erie,
elevation 570.5 feet above mean tide at New York City. Ordinary
fluctuations of water level are from 4 feet above to low-water datum,
and extreme fluctuations produced by wind and other causes are
from 6 feet above to 3 feet below that plane.
   The estimated cost for new work, revised in 1910, was $99,275, ex-
clusive of amounts expended under previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $10,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 2, 1827, provided for beginning con-
struction of the pier and the acts of 1828 to 1852 inferentially pro-
vided for continuing it to completion (documents or reports not
known, except S. Doc. No. 42, 35th Cong., 1st sess., and Annual Re-
port for 1866, pt. IV, p. 155); the act of March 2, 1867, inferentially
   1 Exclusive of available funds.
 1198     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                  1934

provided for construction of the breakwater and excavating the
entrance channel to 13 feet (report of board of engineers approved
Nov. 30, 1870); the act of June 3, 1896, provided for the entrance
channel and harbor basin of a depth suitable for vessels of 16 feet
draft (H. Doc. No. 63, 54th Cong., 2d sess.); and the act of June
25, 1910, provided for the removal of the rock reef bordering the
inner entrance channel (H. Doc. No. 720, 61st Cong., 2d sess.). The
latest published maps are in Annual Report for 1903, page 2124,
House Document No. 720, Sixty-first Congress, second session.
    Local cooperation.-Fully complied with.
    Terminal facilities.-There are three wharves in this harbor. Two
are too dilapidated for commercial purposes. The third wharf or
public dock, at the foot of Central Avenue, owned by the city of
Dunkirk, is a timber-concrete earth-filled structure designed for com-
mercial use by large lake vessels. A railroad track connects it with
the Erie Railroad, and this in turn with the New York Central Rail-
road. The dock is equipped with a 20-ton traveling crane. The
terminal has been leased to private parties, but is open to all on equal
terms under the terms of the lease.
    The facilities are considered adequate for the small existing com-
merce or any probable increase.
    Operations and results during fiscal year.-The U. S. hopper
dredge Taylor deepened the entrance channel in the lake to a depth
of 16 feet at low-water datum.
    The total cost and expenditure was $4,464.08, for maintenance.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1918 at a saving of $43,101 under the estimated cost. The
structures are of the timber-crib type, 1,037 linear feet of the west
pier and 987 linear feet of the east breakwater have concrete super-
structures, and the remainder of the breakwater and 15.5 feet of the
pier have stone superstructures. About 800 feet of the lake side of
the pier has been reinforced with stone riprap. The harbor struc-
tures are in good condition.
   A depth of 16 feet below low-water datum is available in the en-
trance channel and 14 feet through the basin to the Central Avenue
Wharf. Depths in the remainder of the basin vary from 4 to 12 feet.
   The total cost of the existing project to the end of the fiscal year
was $405,783.33, of which $56,174.10 was for new work and $349,-
609.23 for maintenance. The total expenditure was $405,783.33.
   Proposed operations.-No funds are available. Maintenance
dredging is contemplated during the fiscal year 1935 and funds will
be allotted when the amount required is determined. No work is
proposed for the fiscal year 1936.

                           Cost and financial summmary

Cust of new work to June 30, 1934___________________________           $867, 424. 04
Cost of maintenance to June 30, 1934______________________              526, 129. 54
     Total cost of permanent work to June 30, 1934___________1, 393, 553. 58
Net total expenditures_ _-_______------------_-______               1, 393, 553. 58
Total amount appropriated to June 30, 1934 __.        __.______- __ 1, 393, 553. 58
              RIVERS AND HARBORS--BUFFALO,                                 N.      Y., DISTRICT               1199

        Fiscal year ending June 30              1930           1931                1932             1933      1934


Cost of new work----  - --      - --    -    - - - -          --------------
Cost of maintenance_
                 .. __k          _________   $51, 051. 03   $86,582.22     $16,
                                                                              885.92           -_--_-_-__
                                                                                                      $4, 464. 08
Total expended_-   --   ____ .---- _____ -- 64, 395. 11      86, 460. 89         17, 007. 25   ----           4, 464. 08
Allotted.   __-    --
                    . -----
                   __-         ________       41, 600. 00    60, 000. 00        -2, 723. 98 -----          - 4, 464. 08


Amount allotted from War Department Appropriation Act approved
July 14, 1932---------------------------------------------    $4, 464. 08
Gross amount expended---------------------                      4, 464. 08
                                10. BUFFALO HARBOR, N. Y.

   Location.--At the eastern end of Lake Erie, at the head of Niagara
River, 176 miles easterly from Cleveland, Ohio. (See U. S. Lake
Survey Charts Nos. 3, 312, and 314.)
   Previous projects.-The original project was adopted by River and
Harbor Act of May 20, 1826, with modifications by River and Harbor
Acts of July 7, 1838, June 23, 1866, June 23, 1874, June 3, 1896,
March 2, 1907, and June 25, 1910. The total cost and expenditures
were $6,161,232.33, of which $4,277,585.69 was for new work and
$1,883,646.64 for maintenance since 1887. For further details see
page 1967 of Annual Report for 1915.
   Existing project.-This provides for an outer harbor about 41/
miles long and 1,600 feet wide, formed by a breakwater system ap-
proximately parallel to the lake shore, extending from Stony Point
to the head of Niagara River, and comprising a total length of
about 22,404 feet, with two lentrance channels, one at the north end
21 feet deep at low-water datum and 1,300 feet wide, and one at the
south end, natural depth 21 to 26 feet, and 550 feet wide, and a gap
about in the center for water circulation, natural depth about 20
feet and about 150 feet wide; for a Idepth of 23 feet in area C at
the north entrance and a depth of 21 feet in areas A, B, D, F, G,.
H, I, and K (but extending only to within 100 feet of the harbor
line), in the outer harbor, and a triangular area at the junction of
the North Entrance Channel and Black Rock Channel; for an en-
trance channel to the inner harbor (Buffalo River and City Ship
Canal) 21 feet deep and 180 to 250 feet wide, with enlargement at;
the inner end by the removal of the Watson elevator site to a depth
of 21 feet; for a south pier of timber-crib type 1,760 feet long at the
entrance to the inner harbor; and for a sand-catch pier 1,148 feet
long in the outer harbor about opposite the middle gap.
   The project depths are referred to low-water datum for Lake Erie,
elevation 570.5 feet above mean tide at New York City. Ordinary
fluctuations of water surface are from 3.5 feet above, to 0.5 foot below
low-water datum, and extreme fluctuations due to wind and other
causes about 9 feet above and 31/2 feet below that plane.
   The estimate of cost for new work, revised in 1930, was $895,150,
exclusive of amounts expended on previous projects. The latest
 (1930) approved estimate for annual cost of maintenance is $55,000.
   The existing project was authorized by the following river and
harbor acts: The act of May 20, 1826, provided for the construction
of the south pier, modified in 1868, for extension (documents or
        91536---ENo 1934-76
1200   REPORT OF CHIEF OF ENGINEERS,       U.   S.   ARMY,   1934


reports not known, except as to extension, Annual Report for 1868,
pp. 222, 232); the act of June 23, 1874, inferentially provided for
the sand-catch pier modified by the act of June 3, 1896 (report of
Board of Engineers, Annual Report for 1876, pt. 2, p. 573, and for
1895, p. 3153); the act of June 23, 1866, inferentially provided for
construction of the breakwater (report of Board of Engineers,
Annual Report for 1868, pp. 232-236, and for 1876, pt. 2, p. 569);
modified by the act of June 3, 1896 (report of Board of Engineers,
Annual Report for 1895, p. 3153), by the sundry civil act of March
3, 1905, and by the River and Harbor Act of March 2, 1907 (H. Doc.
No. 240, 59th Cong., 1st sess.); the act of March 3, 1899, modified
by the act of March 3, 1909, provided for the construction of the
north breakwater (H. Doc. No. 72, 55th Cong., 1st sess.); the act of
June 6, 1900, modified by the act of June 13, 1902, provided for the
deepening of the entrance channel to the inner harbor and removing
rock shoal therein (specified in acts); the act of June 25, 1910, pro-
vided for the extension of Federal project to Commercial Street and
removal of the Watson elevator site (H. Doc. No. 298, and Rivers
and Harbors Committee Doc. No. 2, 61st Cong., 2d sess.); the act
of July 25, 1912, provided for securing the depth of 21 feet over
areas A, B, and D, in the outer harbor, and a depth of 23 feet
over area C in the main outer entrance for a width of 800 feet
 (H. Doc. No. 550, 62d Cong., 2d sess.); the act of March 2, 1919,
provided for the deepening of areas F and G (H. Doc. No. 1139,
64th Cong., 1st sess.) and of a triangular area at the north en-
trance (H. Doc. No. 1004, 65th Cong., 2d sess.); the act of January
21, 1927, provided for the removal of a shoal between the entrance
channel to Buffalo River and Erie Basin (H. Doc. No. 481, 68th
Cong., 2d sess.); and the act of July 3, 1930, provided for the
deepening of areas H, I, and K in outer harbor (Rivers and Har-
bors Committee Doc. No. 1, 71st Cong., 1st sess.).
   The latest published maps are in Rivers and Harbors Committee
Document No. 1, Seventy-first Congress, first session, and House
Document No. 46, Seventy-third Congress, first session.
   Supplementing the work authorized by Congress, the additional
breakwater construction recommended by the Chief of Engineers in
House Document No. 46, Seventy-third Congress, first session, has
been included in the public-works program under the National In-
dustrial Recovery Act.
   Recommended modifications of project.-Under date of January
4, 1933, the Chief of Engineers recommended further improvement
of Buffalo Harbor so as to provide for the extension of the south
entrance breakwater 1,000 feet; for the extension of the south break-
water at the middle gap, 300 feet; for the deepening to 23 feet the
portion of the outer harbor north of the line perpendicular to, the
south breakwater and 2,000 feet north of its southern end, including
the triangular area just inside of the north entrance; the deepening
to 25 feet of the south entrance and that portion of the outer harbor
south of the line defined above; for removal to 27 feet of three small
shoals located on the direct route of approach to the south entrance;
and for the elimination from the project works of the sand-catch
pier; all at an estimated cost of $1,863,000, with $5,000 annually for
maintenance in addition to that now required; subject to the con-
ditions that no dredging shall be done within 50 feet of the United
         RIVERS AND IHARBORS-BUFFALO,        N.   Y.,   DISTRICT   1201
States harbor lines, and subject to certain conditions of local co-
operation (H. Doc. No. 46, 73d Cong., 1st sess.). Breakwater con-
struction included in public-works program.
   Local cooperation.-Fully complied with. Considerable work of
improvement and maintenance was done outside of the project for
the benefit of the public by the city of Buffalo, the State of New
York, and others, details of which are published on pages 1585-1586,
Annual Report for 1932.
    Terminal facilities.-Outerharbor: Consists of two canals'or slips
at the southern end of the harbor which provide wharves for unload-
ing and shipping iron ore and limestone. One is that of the Bethle-
hem Steel Co., Inc., Lackawanna plant, an industrial concern manu-
facturing steel products, the other the Union Canal, occupied on one
side by the Hanna Furnace Co. and the Bethlehem Steel Co. and
on the other side by the Pennsylvania Railroad Co. and the Great
Lakes Portland Cement Co. In addition to the 3 iron ore docks
there is 1 shipbuilding wharf; 1 grain elevator, 2,000,000 bushels
capacity, completed in 1926; 1 package-freight terminal; 1 Ford
Motor Co.'s assembling and reclaiming plant with slip 200 feet by
1,000 feet on south side of plant; and 11/2 piers with slip between
them owned by the city of Buffalo.
   Inner harbor: The Buffalo River, City Ship Canal, and connect-
ing basins and slips provide facilities for the following: 20 grain
elevators, storage capacity 39,948,000 bushels, with modern appli-
ances for unloading grain from vessels and transfer to cars and canal
barges; 4 coal docks for loading hard coal in vessels, 2 trestles of an
obsolete type, 1 belt conveyor, and 1 modern car dumper; 3 ore docks
for unloading iron ore from vessels-2 owned by industrial plants
manufacturing steel product and cast iron, the other is an ore-trans-
fer dock, owned by a railroad company. There are also 14 merchan-
dise wharves, of which 12 are controlled by the trunk lines entering
Buffalo; the other 2 are owned by private parties; also 3 railroad-
controlled flour docks. Sixteen minor docks are used for unloading
limestone, sand, graved, gypsum, and lumber. Passenger and mer-
chandise lake transportation companies control or own three docks
and another is used by summer excursion steamers. There are 5 pub-
lic docks, 3 of which are owned by the city of Buffalo and 2 by the
State of New York. Of the former, the dock at the foot of Main
Street is the most important, having a frontage of 200 feet. It is
used principally by small dispatch boats and excursion steamers,
under regulation and control of the Buffalo city harbor master.
The two State docks are part of the New York Barge Canal system
and comprise the Erie and Ohio Basins.
   As a rule the terminals owned or controlled by the railroad and
lake transportation companies and grain elevators are open to use
on equal terms by water carriers, while those owned by industrial
corporations or individuals are not.
   Out of a frontage of 17,100 feet of private property protected by
the outer breakwater, completed in 1903, about 5,300 feet is improved
with terminal facilities.
   The facilities are considered adequate for existing commerce.
   Operations and results during fiscal year.-The construction of
about 4,425 linear feet of stone sea slope on the lake side of the old
1202   REPORT   OF   CHIEF OF ENGINEERS,    U.   S.   ARMY,   1934


breakwater was completed. Cost $154,945.38. The Buffalo River
Entrance Channel was restored to project depth by contract dredg-
ing. Cost $16,754.28. Repairs to about 1,968 linear feet of the con-
crete parapet on the old section of breakwater were made by contract.
Cost $59,587.12. Removal of boulders from the north entrance chan-
nel was in progress at the end of the fiscal year by contract. Cost
$4,915.09. Government plant and hired labor repaired 800 linear
feet of the banquette of the old section of breakwater. Cost
$2,028.84; and 150 linear feet of the south pier. Cost $11,249.31.
Repairs were in progress at the end of the fiscal year on an addi-
tional 150 feet of the south pier by Government plant and hired
labor. Cost $5,308.89. The U. S. hopper dredge Taylor restored a
part of the outer harbor to project depth. Cost $7,358.01.
   The U. S. dipper dredge Irondequoit and attendant plant were
sold during the fiscal year at $16,036.71 less than the book value.
   The total cost of maintenance for the fiscal year was $278,183.63,
and the expenditure was $285,637.04, all from regular funds.
   Under authority of the Federal Emergency Administration of
Public Works the construction of the light foundation and cores of
the breakwaters was in progress by contract at the end of the fiscal
year and the work was about 24 percent completed. The total cost of
this new work for the fiscal year was $171,570.44, and the expenditure
was $151,009.10.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1931. The work done under the project is the construction
of the south pier, protecting the entrance to the inner harbor in Buf-
falo River; dredging and rock excavation to secure a channel 21 feet
deep at low-water datum, 180 to 250 feet wide in Buffalo River to
inner end of pier and 250 to 720 feet wide upstream from the pier
to and including the Watson elevator site at the junction of the
Buffalo River and the City Ship Canal, and the formation of an
outer harbor 41/2 miles long, 1,600 feet wide, and 13 to 25 feet deep
at low-water datum.
   The outer harbor is protected by a breakwater system having a
total length of 22,404 feet, with entrances near the north and south
ends, and consists of the Stony Point Breakwater, 1,602.9 feet long,
completed in 1899, to which is attached the south entrance arm, 1,000
feet long, completed in 1914; the south breakwater, 9,989 feet long,
completed in 1903; the north breakwater, 2,203.5 feet long, completed
in 1901; the old breakwater, 7,608.6 feet long, completed in 1893.
There are 9,113 feet of timber crib with concrete superstructure,
370.5 feet of timber crib with stone superstructure, 4,670.5 feet of
timber crib with stone-concrete superstructure, and 8,250 feet of
rubble mound.
   The breakwater system was originally 23,604 feet long, but by sale
of 1,200 feet of the shore end of the Stony Point Breakwater to the
Lackawanna Steel Co. in 1918 it was reduced to its present length.
   The south pier was completed in 1869 and the sand-catch pier in
1897.
   The project areas in the outer harbor and in the entrance channel
have been deepened to 21 feet, and area C in the outer entrance
channel to 23 feet at low-water datum; however, scattered boulders
in this area have reduced the available depth to 22 feet.
          RIVERS AND HARBORS-BUFFALO,                  N.   Y.   DISTRICT        1203
  The harbor structures are in good condition except the sand-catch
pier, which is not maintained, and the concrete banquette on a part
of the south pier, which requires repairs.
  The controlling depth in harbor and channels is 20 feet at low-
water datum.
  The total cost of the present project to the end of the fiscal year
was $2,589,201.48, of which $994,824.88 was for new work and $1,594,-
376.60 for maintenance. The total expenditure was $3,696,187.36.
  The work authorized by the Public Works Administration is 9
percent completed. Completion of the 1,000 foot extension of the
South Entrance Breakwater and the 300 foot extension of the south
breakwater at the middle gap and the deepening of the southern
portion and southern entrance to the outer harbor to 25 feet, deepen-
ing the remainder of the harbor area to 23 feet and the removal
of 3 shoals from the steamship lane to the south entrance to a depth
of 27 feet, remains to be done to complete the work authorized. The
work of extending the breakwaters was under contract at the end
of the fiscal year.
  The total cost of this new work to the end of the fiscal year was
$171,570.44. The total expenditure was $151,009.10.
  The total cost, all funds, was $2,760,771.92, of which $1,166,395.32
was for new work and $1,594,376.60 for maintenance. The total
expenditure was $3,847,196.46.
  Proposed operations.-The balance unexpended, including ac-
counts receivable, at the end of the year will be applied as follows:
Regular funds : Accounts payable-          _- ______                        $25, 447.26

Maintenance:
   Removal of boulders in main entrance by contract now in force
      July-August 1934-_
                       ...         __            __                          18, 000. 00
   Dredging in Buffalo River by contract, April 1935_------------_           40, 000. 00
   Dredging by U. S. hopper dredge Taylor, July 1934, June 1935__            23, 194. 40
   Repairs to structures by U. S. derrick boat Niagara July-
      August 1934, May-June 1935                                             27, 000. 00
    New derrick boat___                                                     100, 000. 00

                                                                           208, 194. 40

      Total    funds-     --        -___                              --   233,641. 66

   The balance unexpended of allotment from the National Indus-
trial Recovery Act, $562,990.90, will be applied to completion of
extending the South Entrance Breakwater about 1,000 feet and the
south breakwater at the middle gap about 300 feet, by contract in
force, July 1934 to November 1935.
   The deepening of the outer harbor to a depth of 23 feet is consid-
ered desirable. Maintenance dredging is required annually and
minor repairs to structures are necessary. For these items of new
work and maintenance, funds can be profitably expended during the
fiscal year 1936 as follows:
New work: Deepening the outer harbor to 23 feet by contract........           $693, 000
Maintenance :
   Dredging Buffalo River entrance by contract_                                 25, 000
   Dredging by U. S. hopper dredge Taylor------------------------               19, 000
   Repairs to structures by Government plant                                    30, 000
      Total_                                      _                            767, 000
1204       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                               1934

                                     Cost and financial summary
                            MAINTENANCE           AND IMPROVEMENT              FUNDS

Cost of new work to June 30, 1934_.__----__-___-                                                   $5, 272, 410. 57
Cost of maintenance to June 30, 1934_ -_____--                                        --
                                                                                   ________         3, 478, 023. 24
      Total cost of permanent work to June 30, 1934_--        -
                                                            ___--                                      8, 750, 433. 81
Value of plant, materials, etc., on hand June 30, 1934--__----                                         1, 085, 239. 41

      Net total cost to June 30, 1934_       --       ---                                              9, 835, 673. 22
Plus accounts receivable June 30, 1934 _____--________---                                  __--            47, 193. 73

      Gross total costs to June 30, 1934_ ... __  ___----                                              9, 882, 866. 95
Minus accounts payable June 30, 1934-------------------------                                              25, 447. 26

     Net total expenditures9__--_9-----    -                                 ___---                9, 857, 419. 69
Unexpended balance June 30, 1934______________                                _______                 186, 447.93
       Total amount appropriated to June 30, 1934 ____                                    ____ 10, 043, 867. 62

   Fiscal year ending June 30             1930              1931            1932            1933               1934


Cost of new work _ -............        $27, 334. 99     $73, 057. 48    $29, 760. 43   ------------       -----------
Cost of maintenance------------         154, 934. 10     148, 763. 98    180, 107. 48     $97, 457. 83       $278, 183. 63

     Total cost------------ ----        182, 269. 09     221, 821.46     209, 867. 91      97, 457. 83       278, 183. 63
Total expended    --..   -.............. 99, 416. 24     740, 343. 69    428, 262. 58      62, 724. 81       285, 637. 04
Allotted- --------------------- .81, 200. 00           1, 138, 998. 11   -13, 218. 50     228, 980. 29       236, 833. 16


Balance unexpended July 1, 1933-------------------------- $235, 251. 81
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934 ____  __________    __ $40, 000. 00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933 -------------------     413, 759. 03
                                                                453, 759. 03

      Amount to be accounted for______----------   __   __  __                                           689, 010. 84
Deductions on account of revocation of allotment and impounded
  funds                                                                                                        925. 87
                                                                                                         2------------------------------
       Net amount to be accounted for______-________                                                     472, 084. 97
Gross amount expended__----_-------__-- $1, 053, 026. 65
Less :
    Reimbursements collected --- __. $474, 653.22
    Receipts from sales-------------  292, 736. 39
                                                   767, 389. 61
                                                                                                         285, 637. 04
      Balance unexpended June 30, 1934 __________                                     _______            186, 447.93
Outstanding liabilities June 30, 1934 _____________                                $33, 123. 22
Amount covered by uncompleted contracts ........                                    30, 387. 23
                                                                                                          63, 510. 45

     Balance available June 30, 1934 .....___            -                         -_____ -_             122, 937. 48
Accounts receivable June 30, 1934____-------- -------------                                               47, 193. 73
       Unobligated balance available June 30, 1934_ .....                          ___----_              170, 131. 21
Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance
                           1  -- -- - - -- -- - -- - -- - -- - -- - -- - -- - -                           74, 000.00

  1 Exclusive of available funds.
                RIVERS        AND HARBORS-BUFFALO,                       N.   Y.,      DISTRICT            1205
                                           PUBLIC      WORKS FUNDS

Cost of new work to June 30, 1934_ _                                                               $171, 570. 44
Cost of maintenance to June 30, 1934---------------------                                          -----------
      Total cost of permanent work to June 30, 1934-----------171, 570.44
Plus accounts receivable Juhie 30, 1934 ---- __---------------  - 1, 260. 28

      Gross total costs to June 30, 1934__ --- ____,-   ----                                        172, 830. 72
Minus accounts payable June 30, 1934__------__------------                                           21, 821. 62

     Net total expenditures________-   -   --
                                      ______--                                                      151, 009. 10
Unexpended balance June 30, 1934_-__..-----------------                                             562, 990. 90

           Total amount appropriated to June 30, 1934__________--_                                  714, 000. 00

           Fiscal year ending June 30               1930      1931            1932          1933           1934

               _____________.__________.
Cost of new work....... ........                .___                                                    $171, 570. 44
           wrk--------------------------
          Cost o new                                    ------------ ------------ ----- $7,504
Cost of maintenance_------------             -------------------------------------------------
Total expended__ ... _ _...     . __       ____                             .  ....                      151, 009.10
             Totl epened---------------------------- ------------ ------------                           1,090
Allotted         -------------------- ---------------------------------------------                      714,000. 00

Amount allotted from National Industrial Recovery Act approved
  June 16, 1933----    ------------------------------------                                        $809, 000.00
Deductions on account of revocation of allotment-----------                                          95, 000. 00

      Net amount to be accounted for ___________-______-                                            714, 000. 00
Gross amount expended_____________________      $151, 902. 28
Less reimbursements collected__--__-____- ----        983. 18
                                                                                                    151, 009. 10
      Balance unexpended June 30, 1934__--------------------                                        562, 990. 90
Outstanding liabilities June 30, 1934------------  $1, 260. 28
Amount covered by uncompleted contracts--------   562, 821. 34
                                                                                                    564, 081.62

      Balance available June 30, 1934_1111111111__                            __....                -- 1, 090. 72
Accounts receivable June 30, 1934_ __-----------                                                       1, 260. 28

           Unobligated balance available June 30, 1934________ -                            -      -      169. 56

Amount (estimated) required to be appropriated for completion
                                          -
of Public Works Administration project 1______  _____     ___                                   1, 059, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1936, for new work 1__________________________                                            693, 000. 00
      CONSOLIDATED) COST AND FINANCIAL SUMMARY FOR BUFFALO HARBOR,                                     N. Y.
Cost of new work to June 30, 1934_________________________ $5, 443, 981.01
Cost of maintenance to June 30, 1934_ __     -------- ___ __ 3, 478, 023.24
      Total cost of permanent work to June 30, 1934----------                                    8, 922, 004. 25
Value of plant, materials, etc., on hand June 30, 1934----------                                 1, 085, 239.41
      Net total cost to June 30, 1934_---------------------                                     10, 007, 243.66
Plus accounts receivable June 30, 1934_--------------                                                48, 454. 01
     Gross total costs to June 30, 1934                     -------------------- 10, 055, 697. 67
Minus accounts payable June 30, 1934_ ---                            -                   ___-
                                                                                    -_______           47, 268. 88
     Net total expenditures ________---__-- ___     _                                  _        10, 008, 428. 79
Unexpended balance June 30, 1934 ______- -- _____-___-                                  -   -       749, 438. 83
           Total amount appropriated to June 30, 1934____________ 10, 757, 867. 62
   SExclusive of available funds.
1206            REPORT OF CHIEF OF ENGINEERS,                                       U.    S.      ARMY,       1934


    Fiscal year ending June 30                      1930              1931            1932             1933                 1934


Cost of new work----__-_  -             _       - $27, 334. 99     $73, 057. 48    $29, 760. 43 ----                      $171, 570. 44
Cost of maintenance- __--....                     154, 934. 10     148, 763. 98    180, 107. 48      $97, 457. 83          278, 183. 63
      Total cost-_             .-                 182, 269. 09     221, 821. 46    209, 867. 91       97, 457. 83          449, 754. 07
'Total expended-                ..- .              99, 416. 24     740, 343. 69    428, 262. 58       62, 724. 81          436, 646. 14

Allotted ....      __............__
                               ___          .      81, 200. 00   1, 138, 998. 11   -13, 218. 50     228, 980. 29           950, 833. 16


Balance unexpended July 1, 1933             ____________________                                                    $235, 251. 81
Amount allotted irom War Department Appropria-
tion Act approved Apr. 26, 1934________________      $40, 000. 00
Amount allotted from War Department Appropria-
tion Act approved Mar. 4, 1933___------------        413, 759'. 03
Amount allotted from National Industrial Recovery
  Act approved June 16, 1933__________--______        809, 000. 00
                                                                                                               1, 262, 759. 03
      Amount to be accounted for_______________                                                                1, 498, 010. 84
Deductions on account of revocation of allotment and impounded
  funds -----------------------------------------------------                                                       311, 925. 87

      Net amount to be accounted for---__---____--___----                                                      1, 186, 084. 97
Gross amount expended __     __________________ $1, 205, 018. 93
Less:
    Reimbursements collected -..... $475, 636. 40
    Receipts from sales ------------ 292, 736. 39'
                                                    768, 372. 79
                                                                                                                    436     646. 14


      Balance unexpended June 30, 1934___           __-________ ___                                                  749, 438. 83
Outstanding liabilities June 30, 1934--------------     $34, 383. 50'
Amount covered by uncompleted contracts .......         593, 208. 57
                                                                                                                    627, 592. 07
     Balance available June 30, 1934_________________________                                                        121, 846. 76
Accounts receivable June 30, 1934_                                                                                    48, 454. 01

          Unobligated balance available June 30, 1934_____________                                                   170, 300. 77
Amount (estimated) required to be appropriated for completion
   of existing project 1____________                                                                           1, 059, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1936:
      For new work 1                                                                         ----                    693, 000. 00
      For maintenance ---------------------------                                                                     74, 000. 00

          Total 1                                                                                                   767, 000. 00

       11. BLACK ROCK CHANNEL AND TONAWANDA HARBOR, N. Y.

  Location.-This improvement is essentially that of the upper 131/2
miles of the Niagara River from its head at Lake Erie, Buffalo,
N. Y., to and including Tonawanda Harbor, N. Y. It comprises the
improvements formerly designated by three titles, viz, Lake' Erie
entrance to Black Rock Harbor and Erie Basin, N. Y., Black Rock
Harbor and Channel, N. Y., and Tonawanda Harbor and Niagara
River, N. Y. (See U. S. Lake Survey Chart No. 312.)
  Previous projects.-Lake Erie section, none. The original project
for Black Rock Harbor and Channel was adopted by the River and
   SExclusive      of available funds.
            RIVERS 'AND HARBORS-BUFFALO,                  N. Y., DISTRICT   1207
Harbor Act of March 2, 1829. The original project for Tonawanda
Harbor and Niagara River was adopted by the River and Harbor
Act of March 3, 1881. The cost and expenditures on these projects
were $58,027.28, all for new work. For further details see items 5
and 7, page 1970, of Annual Report for 1915.
    Existing project.-This provides for a channel 21 feet deep from
Buffalo Harbor, north entrance channel, to opposite Sixth Avenue.
North Tonawanda, total length 131/2 miles, as follows: 400 feet wide
to Erie Basin, Buffalo, a distance of 2,300 feet, suitably widened
at the bend, and thence 500 feet wide to the foot of Maryland Street,
Buffalo, a distance of 2,190 feet; thence 350 feet wide, narrowing to
200 feet wide, 500 feet northwest; and from thence 3.3 miles through
Black Rock Channel, generally 200 feet wide, but widened to 240
feet at the curve opposite, the foot of Porter Avenue, and widened
to 300 feet at the angle immediately south of the International
Bridge. The project also provides for a ship lock at Bridge Street,
for a bridge over the canal at Ferry Street, and for the repair of
Bird Island Pier, and the towpath wall. From the ship lock the
project continues with a channel 400 feet wide in the Niagara River
to the natural deep-water pool at the upstream end of Rattlesnake
Island, a distance of 3.4 miles, and provides for the removal of 200
feet of the westerly end of Rattlesnake Island Shoal, making a
channel 500 feet wide. For a channel 400 feet wide from the down-
stream end of the deep-water pool at the Tonawanda waterworks
intake crib to the foot of Tonawanda Island opposite Second Avenue,
North Tonawanda, a distance of 5,000 feet and a turning basin about
1,230 feet long and 1,050 feet wide, extending from the foot of
Tonawanda Island to a point opposite Sixth Avenue; and for a
channel 16 feet deep and generally 400 feet wide in Tonawanda Inner
Harbor, 6,800 feet long, and 16 feet deep and generally 180 feet wide
in Tonawanda Creek, 1,400 feet long.
    The project depths correspond to depths of 20.2 feet above the
lock, increasing gradually to 20.4 feet at Tonawanda, and to a depth
of 15.4 feet in Tonawanda Harbor, on the Lake Survey Chart Upper
Niagara River, Index No. 312. Ordinary fluctuations of water level
above the lock are from 3.5 feet above to 0.5 feet below low-water
datum, and extreme fluctuations produced by winds and other causes
are about 9 feet above to 31/2 feet below that plane. River fluctua-
tions gradually decrease to about 70 percent of fluctuations above the
lock when they reach North Tonawanda.
   The estimate of cost for new work, revised in 1925, was $6,876,630,
exclusive of amounts expended on previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $23,000.
                          Description of Black Rook Lock

Location, foot of Bridge Street, Buffalo, N. Y. (in city limits).
Dimensions :                                                                  Feet
   Length between miter sills----------------------__                       650
   Available length for full width_______________________________           625
   Width in clear (between fenders)                                          68
    Depth on miter sills at low water ______________________21.                  7
   Lift____     -_______5.--,,_
                       -                                          ------     35-----
                                                                                2
Foundation (lock), bedrock.
Dam, fixed.
1208    REPORT    OF   CHIEF OF    ENGINEERS, U.         S.       ARMY,   1934

Type of construction:
    Lock, concrete walls; steel mitering gates.
    Dam; the dam consists of Squaw Island and Bird Island
       Pier lying between the canal and Niagara River. The
    pier was built of timber cribs filled with stone in 1822-34,
    chiefly by State of New York. Cost is unknown.
Cost of lock------------------------------------ ---------       $1, 037, 213.20
Approach walls and office storehouse--------------------------       526, 842. 53

       Total -------------------------------        -----------           1, 564, 055.73
   The existing project was authorized by the following river and
harbor acts: The act of August 11, 1888, provided for the channel in
Niagara River (H. Doc. No. 83, 50th Cong., 1st sess.), modified by
the act of June 3, 1896, for its deepening to 16 feet and extension to
the foot of Tonawanda Island and in Tonawanda inner harbor
 (Annual Report for 1897, pp. 3116-3120; by the act of June 13,
1902, for deepening Tonawanda Creek to 16 feet (H. Doc. No. 143,
56th Cong., 1st sess.), by act of March 3, 1905, for deepening to 21
feet, except Tonawanda inner harbor and Creek and main river
channel along and to the foot of Tonawanda Island (H. Doc. No. 428,
58th Cong., 2d sess.); and by act of July 27, 1916, for deepening the
channel along and to the foot of Tonawanda Island, ending in a
turning basin and making consolidated funds available therefor
 (H. Doc. No. 658, 63d Cong., 2d sess.) ; the act of June 13, 1902, pro-
vided for the channel in Lake Erie to the foot of Maryland Street
 (H. Doc. No. 125, 56th Cong., 2d sess.), modified by the act of August
8, 1917, for widening it at the bend and making consolidated funds
available thereto; the act of March 3, 1905, provided for the 21-foot
channel through Black Rock Canal and for ship lock, bridge, and
repair of pier and wall (H. Doc. No. 428, 58th Cong., 2d sess.), modi-
fied by the act of September 22, 1922, for widening channel at the
foot of Maryland Street (H. Doc. No. 981, 66th Cong., 3d sess.), mod-
ified by the act of March 3, 1925, for widening Black Rock Canal im-
mediately south of the International Bridge and for the removal of
the westerly end of Rattlesnake Island Shoal (H. Doc. No. 289, 68th
Cong., 1st sess.).
   For latest published maps see the following documents:
  Black Rock Channel (Lake Erie Entrance and Black Rock Canal) House
Document No. 981, Sixty-sixth Congress, third session.
  Black Rock Channel and Tonawanda Harbor, Niagara River section; Rattle-
snake Island Shoal, House Document No. 289, Sixty-eighth Congress, first
session.
  Black Rock Channel and Tonawanda Harbor, House Document No. 28, Sev-
third Congress, first session.
  Recommended modifoations of project.-Under date of April 15,
1933, the Chief of Engineers recommended modification of the exist-
ing project so as to provide for removal of the rock shoals in the
Lake Erie entrance to the canal and in the canal south of the Ferry
Street Bridge, to a depth of 22 feet at low-water datum; enlarge-
ment of the North Tonawanda turning basin by widening it 200 feet
to the westward; the construction of an 800-foot southerly extension
to the Bird Island Pier; the improvement of the guide pier of Black
Rock Lock as proposed; and the elimination from the Federal proj -
ect of the upper 150 feet of the Tonawanda Creek Channel, fixing
the upper limit at the downstream side of the Main-Webster Street
Bridge, at an estimated cost of $1,044,000, with $2,000 annually for
          RIVERS AND HARBORS-BUFFALO,        N.   Y.,   DISTRICT   1209
maintenance in addition to that now required (H. Doe. No. 28, 73d
Cong., 1st sess.).
    Local cooperation.--Fully complied with.
    Terminal facilities.-There are no terminals along the canalized
channel above the Black Rock Lock. Transfer of freight takes place
across the towpath to commercial plants on the east side, consisting
of 1 grain mill at the foot of Albany Street, 1 grain elevator
mill, and malting house, foot of Brace Street, 1 sand and gravel
yard at the foot of Bird Avenue, and a carwheel foundry at the foot
of Forest Avenue.
    The city of Buffalo uses frontage at the old Massachusetts Street
waterworks pumping station, and owns frontage at the Porter Ave-
nue waterworks pumping station (part leased to the Buffalo Yacht
Club) and used only for small-boat landings. It also owns a pier at
the foot of Georgia Street.
    Under permit of the Secretary of War, dated June 23, 1913, the
northerly 2,950 feet of Bird Island Pier and adjacent area was turned
over to the city of Buffalo for occupation and use as a public park
and landing facilities, that part of the pier to be maintained by the
city. Under this permit the city constructed two bulkheads. In
addition the bulkhead in Niagara River, 815 feet along the westerly
limit of the area south of Ferry Street and 1,924 feet north of Ferry
Street has been completed. Total cost $628,925.
    Along the easterly bank of the Niagara River, below the Black
Rock Lock, the terminals consist of the following: American Radia-
tor Co., machine-tool department, three sand and gravel yards, one
at the foot of Hamilton Street, one extending from the foot of
Austin Street, to the foot of Hertel Avenue, Buffalo; and the third at
the foot of Ontario Street; one passenger dock at the foot of Amherst
street; a ferry dock about 21/4 miles below the lock; a coal dock to
supply fuel to the C. R. Huntley power plant 21/2 miles below the
lock; a ferry and an oil dock about 31/s miles.below the lock; a blast
furnace dock on Rattlesnake Island, 4 miles below the lock; and an
foil dock about 53/8 miles below the lock; all used exclusively by the
,owners thereof.
   At Tonawanda and North Tonawanda the terminal facilities con-
sist of wharves along the river frontage extending one-fourth mile
above and 2 miles below the Tonawanda Creek; also all of the 13/4
miles of water front of Tonawanda Island, of the main shore of
North Tonawanda, and the water front to Tonawanda Creek from its
mouth to the Webster-Main Street highway bridge, a distance of
1,400 feet.
    There are 10 lumber docks, 2 sand and gravel docks, 1 ore dock,
1 pulpwood dock, 1 fueling dock, 1 passenger dock, landing for ex-
cursion boats, 1 ferry dock, a small boat-repair yard and the Paper
Board Corporation's dock. The ore dock, sand and gravel, and
fueling docks are equipped with unloading machinery, but the other
docks have no such appliances.
   All wharves have railroad connections, are owned by the com-
panies using them, and are open to all water carriers which are suit-
able and chartered for the traffic.
   There are also two State docks which are part of the New York
Barge Canal system, one in North Tonawanda, the other in Tona-
vanda on opposite sides of Tonawanda Creek. These terminal
facilities are considered adequate for existing commerce.
1210     REPORT         OF        CHIEF   OF ENGINEERS,    U.   S.   ARMY,   1934


    Operations and results during fiscal year.-The harbor was reim-
bursed during the year by the city of Buffalo for dredging done fiscal
year 1933. Cost minus $1,705.45.        A portion of the Lake Erie
entrance channel was restored to project depth by contract dredging.
Cost $40,851.23.
    Contract dredging to restore the project depth of 16 feet in the
used channels of the Little River, a branch of the Niagara River,
was in progress at the end of the fiscal year. Cost $13,507.13.
    The total cost for maintenance for the fiscal year was $52,652.91,
and the expenditure was $49,911.71.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1931 at a saving of $720,161 under the estimated cost.
The channel from Buffalo Harbor north entrance channel to oppo-
site Sixth Avenue, North Tonawanda, is completed. The different
sections of this channel were completed as follows: Lake Erie sec-
tion in 1909, widened at the bend opposite foot of Georgia Street,
Buffalo, in 1924; Black Rock Canal section in 1915, widened just
south of the International Bridge at Buffalo in 1928; Niagara River
section from lock to deep-water pool above Tonawanda in 1913 and
the removal of 200 feet of the westerly end of Rattlesnake Island
Shoal in 1928; and widening the channel opposite the foot of Mary-
land Street, Buffalo, in 1930.
    The Tonawanda Creek Channel was completed in 1902. Tona-
wanda Inner Harbor Channel was completed in 1904. The lock,
including wing walls and retaining walls above the lock, was com-
pleted in 1914, and the 100-foot east wing wall extension in 1927.
The guide pier connecting with the west lower wing wall was com-
pleted in 1916. The bridge at Ferry Street was completed in 1914,
the Ferry Street storehouse in 1923, the lock-operating houses and
office-storehouse ii 1924, the storage-warehouse in 1930, and the oil
storehouse in 1931.
   Structures are all in good condition except the towpath wall and
low part of Bird Island Pier, which require frequent repairs.
   The controlling depths at low-water datum are: Lake Erie section
and Black Rock Canal, 18.3 feet; Niagara River Channel, 18.0 feet;
Tonawanda Harbor, 16 feet; and Tonawanda Creek Channel, 12.6
feet.
   The total cost of the existing project to the end of the fiscal year
was $6,597,910.95, of which $6,156,468.60 was for new work and
$441,442.35 for maintenance. The total expenditure was $6,697,764.45.
   Proposed operations.-The balance unexpended at the end of the
year will be applied as follows:
Accounts payable June 30, 1934                                       111.88
                                                                  $-----------------
Maintenance :
    Dredging by U. S. hopper dredge Taylor, July 1934-------------4, 474. 87
    Repairs to towpath wall by Government plant, Aug. 1-Oct. 31,
       1934                            -13,               _--                       000.00
       Total   ---------------------                                            19, 586. 75

  Redredging is required annually, and minor repairs to structures
are necessary. For these items of maintenance, funds can be profit-
ably expended during the fiscal year 1936 as follows:
Dredging by U. S. hopper dredge Taylor-----------_                              $6, 600. 00
Repairs to structures by Government plant---                                    10, 000. 00
      Total------                                                               16, 600. 00
                RIVERS AND HARBORS-BUFFALO,                                   N.     Y., DISTRICT             1211
                                          Cost and financdial snummnary

Cost of new work to June 30, 1934_ _ _____________---                                               $6, 214, 495. 88
Cost of maintenance to June 30, 1934____ __________---                                                  441, 442. 35

      Total cost of permanent work to June 30, 1934                                                     655, 938. 23
                                                                                                     6-----------,
Value of plant, materials, etc., on hand June 30, 1934-----------                                       101, 965. 38

     Net total cost to June 30, 1934 _____               6, 757, 903. 61
Minus accounts payable June 30, 1934 _______________--------2, 111.88
     Net total expenditures-----------------------------6, 755, 791. 73
Unexpended balance June 30, 1934_______----__-----------    19,386. 75

           Total amount appropriated to June 30, 1934                                                 , 775, 378. 48
                                                                                                     6______________

   Fiscal year ending June 30                1930                   1931      1932           1933            1934


Cost of new work................            $3, 407. 41       $88, 806. 55 ... ............
Cost of maintenance------------........     12, 681. 15        78, 565. 29   $25, 602. 34 $9, 821.67        $52, 652. 91

                                    16, 088. 56 167, 371. 84
       Total cost ............---------------.....                           25, 602. 34     9,821.67        52, 652. 91

Total expended..................            45, 491. 21       167, 082. 76   25, 201. 20     7, 116. 56      49, 911. 71

Allotted        ---.........................
                              138, 800. 00 22, 000. 00                       -7, 000. 00     5, 000. 00      64, 100. 00


Balance unexpended July 1, 1933---------------------------              $5, 398. 4ti
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934 _-__   ___-__         ------- $16, 600. 00
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933___--------------                47, 500. 00
                                                                        64, 100.                                    (140
      Amount to be accounted for _--_______-____-                                          ___-           69, 498. 46
Gross amount expended---------------------------$52,                                           710. 50
Less reimbursements collected_----- --            __----                                    2, 798. 79
                                                                                                          49, 911. 71

      Balance unexpended June 30, 1934____________________
Outstanding liabilities June 30, 1934- -----
Amount covered by uncompleted contracts _----___-
                                                  1$2,  056. 21
                                                   - 2, 240. 17
                                                                19,586. 75
                                                                             -------
                                                                 4, 296. 38
           Balance available June 30, 1934_______________                                  _________ 15, 290. 37

Amount that can be profitably expended in fiscal year ending June
   30, 1936, for maintenance' --                    -------------                                         16, 600. 00

12. OPERATING AND CARE OF BLACK ROCK CANAL AND LOCK AND
            FERRY STREET BRIDGE, BUFFALO, N. Y.

   The improvement for which report is made under this caption
forms part of the project for Black Rock Channel and Tonawanda
Harbor, N. Y. See pages 1206 to 1211, where general information
can be found. The work carried on is the operation and maintenance
of the lock and the Ferry Street Bridge. The lock has been operated
and maintained under the permanent indefinite appropriations since
August 17, 1914, and the bridge since July 9, 1914.
   Operations and results during fiscal year.-The lock was in con-
tinuous operation 265 days and in operation during the day only, for
89 days. The lock was closed March 31 to April 10, 1934, for under-
water cleaning and repairs. The Ferry Street Bridge was in con-
   1Exclusive      of available funds.
1212          REPORT OF CHIEF OF ENGINEERS,                                                    U. S.      ARMY,             1934


tinuous operation 260 days and during the day only, for 105 days.
The signal station at the foot of Genesee Street, Buffalo, N. Y., was
maintained except from December 16, 1933, to May 14, 1934. The
total cost for the fiscal year was $43,221.97, and the total expenditure
was $43,860.82.
   Condition at end of fiscal year.--The work done consisted in the
operation and maintenance of the Black Rock Canal and Lock and
Ferry Street Bridge. The structures are all in good condition. The
controlling depth in the canal at the end of the fiscal year was 18.3
feet at low-water datum, and the ordinary fluctuations of water
surface are about 31/2 feet; extreme fluctuations in lake 9 feet above
and 3 feet below, and at lock, 7 feet above and 2 feet below that
plane. The total cost to the end of the fiscal year was $1,301,815.76.
The total expenditure from the indefinite appropriation was
$1,298,348.12.
   Proposed operations.-The structures will be operated and main-
tained under allotments from appropriations made available for
such purposes.
                                                  Cost and financial summary
Cost of maintenance to June 30, 1934---------------------- $1, 301, 815. 76
Minus accounts payable June 30, 1934------------------------     3, 467. 64

     Net total expenditures ----------------------------                                                                     1, 298, 348. 12
Unexpended balance June 30, 1934---------------------------                                                                      17, 679. 94
           Total amount appropriated to June 30, 1934                                                   ___------------      1, 316, 028. 06

           Fiscal year ending June 30                                1930               1931          1932                1933          1934


Cost of new work-------------                          .--------------------
Cost of maintenance --                          ..--.--------------.
                                                               $81, 517. 45         $65, 470. 84   $70, 838. 06     $53, 833. 95      $43, 221. 97
Total expended                   ....--------                 --     80, 258. 77
                                                 .....------------....               62, 735. 53    74, 014. 44      54, 782. 74      43, 860. 82

Allotted              -----...
             .....------          ...-----------------            92, 000. 00        70, 000. 00    60, 000. 00      52, 055. 06       54, 193. 42


Balance unexpended July 1, 1933__                                   $7, 347. 34
Amount allotted from permanent indefinite appropriation, section 6,
  River and Harbor Act, March 3, 1909----------- ------------- 57, 652. 66

      Amount to be accounted for---------------------------65,000.       00
Deductions on account of revocation of impoundments------------- 3, 459. 24

      Net amount to be accounted for------------------------61,                                                                        540. 76
Gross amount expended    -------------------------- $44, 547.87
Less reimbursements collected ------------------------   687. 05
                                                                                                                                   43, 860. 82

      Balance unexpended June 30, 1934            ------                                                                           17, 679.94
Outstanding liabilities June 30, 1934-------------------------                                                                      5, 469. 92

     Balance available June 30, 1934                                                                   ___ 12, 210. 02
                                                                                    --------------------
Amount allotted for fiscal year 1935                                               ---------------------
                                                                                                     _     45, 000. 00

           Balance available for fiscal year 1935________________________ 57, 210. 02
                                                13. NIAGARA RIVER, N. Y.

  Location. This improvement covers that portion of the Niagara
River from Tonawanda Harbor, N. Y., to Niagara Falls, N. Y., a
distance of 71/ miles. The downstream limit of the improvement
          RIVERS AND HARBORS-BUFFALO,         N.   Y., DISTRICT   1213
is about 16 miles from the mouth of the river at Lake Ontario. (See
U. S. Lake Survey Chart No. 312.)
   Previous projects.-Adopted by River and Harbor Acts of July 13,
1892, August 18, 1894, and June 25, 1910. The cost and expenditures
were $68,507.24, all for new work. For further details see page 1970
of Annual Report for 1915.
   Existing project.-This provides for a channel 12 feet deep and
300 feet wide in the east channel from the downstream end of the
existing 21-foot channel opposite Sixth Avenue, North Tonawanda,
to the upstream end of the 12.7-foot channel near the Niagara Falls
waterworks intake crib; and for a channel 12.7 feet deep and from
300 to 400 feet wide from the Navy Island Channel (natural) to the
foot of Hyde Park Boulevard (formerly called Sugar Street),
Niagara Falls, N. Y.
   The project depths are referred to the sloping river surface when
Lake Erie is at low-water datum, elevation 570.5 feet above mean
tide at New York City. Ordinary fluctuations of water level are
from 2 feet above to 0.5 foot below low-water datum, and extreme
fluctuations, produced by wind and other causes, are from 51/2 feet
above to 11/2 feet below that plane.
   The project also provides for the construction of compensating
works just above the contracted section of the river at Fort Erie, this
work forming a part of the project for deeper channels in the con-
necting waters of the Great Lakes, as authorized by the River and
Harbor Act approved July 3, 1930 (H. Doc. No. 253, 70th Cong.,
1st sess.).
   The estimate of cost for new work, revised in 1930, is $1,616,600,
including $27,562.50 contributed by local interests, and $700,000 for
compensating works, but exclusive of amounts expended on previous
projects. The latest (1930) approved estimate of cost of annual
maintenance is $9,000, of which $5,000 is for maintenance of the
compensating works.
   The existing project was authorized by the following river and
harbor acts: The act of July 25, 1912, provided for the channel 12.7
feet deep from the Navy Island Channel and widening and deepen-
ing to 12.7 feet of the Niagara Falls waterworks channel from the
intake crib to the foot of Hyde Park Boulevard (formerly called
Sugar Street) (H. Doc. No. 549, 62d Cong., 2d sess.); and the act of
July 3, 1930, provided for the 12-foot channel (H. Doc. No. 289, 71st
Cong., 2d sess.) and for the compensating works (H. Doc. No. 253,
70th Cong., 1st sess.). The latest published maps are in the Annual
Report for 1915, page 3306, and in the two last-mentioned documents.
   Local cooperation.-Fully complied with.
   Terminal facilities.-Those between North Tonawanda and Niag-
ara Falls are confined to two docks-one at the foot of Hyde Park
Boulevard (formerly called Sugar Street), 660 feet long, owned by
the Empire Builders Supply Co. and reserved for their private uses,
and the other at the foot of Iroquois Street, 204 feet long, owned by
the Niagara Falls Power Co., open to all water carriers on equal
terms of rental.
   These facilities are considered adequate for the small amount of
existing commerce. Additional terminal facilities have been assured
as required under modification of project adopted by the River and
Harbor Act of July 3, 1930.
1214     REPORT    OF    CHIEF OF           ENGINEERS,           U. S. ARMY,   1934

   Operations and results during fiscal year--New work--Regular
funds.-Contract dredging and rock excavation in the east channel
of Niagara River from North Tonawanda to the channel at Niagara
Falls has been in progress during the fiscal year. The work is com-
pleted with the exception of a small amount of clean-up work of
scattered boulders and blasted rock.
   The total cost was $303,257.93, and the expenditure was $277,538.24.
   Operations conducted under allotment from the Federal Emer-
gency Administration of Public Works consisted of the removal of
scattered boulders and deepening the downstream 500 feet of Schlos-
ser's Channel by dredging and rock excavation during the fiscal
year. The work is about 84 percent completed.
   The cost was $58,192.22, and the expenditure was $54,548.92.
  Condition at end of fiscal year.-The existing project is about 21
percent completed. The east channel from North Tonawanda to
the Niagara Falls waterworks intake has been completed to the
project depth of 12 feet with the exception of removing a few scat-
tered boulders. The work remaining to be done is the completion
of the channel from North Tonawanda to Niagara Falls and the
construction of compensating works just above the contracted section
of the river at Fort Erie.
  The total cost of the existing project, exclusive of Public Works
funds, to the end of the fiscal year was $353,424.01, of which $334,-
719.33 was for new work, and $18,704.68 for maintenance. The
total expenditure, exclusive of Public Works funds, was $325,935.05.
In addition $27,562.50 was expended from contributed funds for new
work.
   The work being done on the existing project under allotment from
the Federal Emergency Administration of Public Works is 84 per-
cent completed. The project channel from the Niagara Falls water-
works intake to the foot of Hyde Park Boulevard is the work being
done with Public Works funds. The work remaining to be done is
the completion of the channel. The total cost of this new work to
the end of the fiscal year was $58,192.22. The total expenditure was
$54,548.92.
   The combined total cost of the existing project to the end of the
fiscal year was $411,616.23, of which $392,911.55 was for new work
and $18,704.68 was for maintenance. The combined total expendi-
ture was $380,483.97. In addition, $27,562.50 was expended from
contributed funds for new work.
   Proposed operations.-The balance unexpended at the end of the
year will be applied as follows:
Regular funds: Accounts payable June 30, 1934--------------_      $27, 488. 96
New work: Completion of channel from North Tonawanda to
  Niagara Falls by contract now in force, July to August 1934---- 44, 335. 93
Maintenance: Removal of boulders from the channel by Govern-
ment plant April, May 1935__-----------------------------          5, 000. 00

      Total----         --------------------------------------                   76, 824. 89
  The balance unexpended of allotment from the National Industrial
Recovery Act, $45,451.08, will be applied to completion of excavating
ledge rock and material other than ledge rock, and removing boulders
from Schlosser's Channel by contract in force, July, August 1934.
              RIVERS AND HARBORS-BUFFALO,                                        N. Y., DISTRICT                        1215
   The additional sum of $7,500 can be profitably expended during the
fiscal year 1936 in maintenance dredging by Government plant.
                                     Cost and financial summary
                          MAINTENANCE           AND IMPROVEMENT                   FUNDS
Cost of new work to June 30, 19341___________________________    $403, 226.57
Cost of maintenance to June 30, 1934__    ___      --
                                               - ______    -_____ 18, 704. 68
      Total cost of permanent work to June 30, 1934------------                                              421, 931. 25
Minus accounts payable June 30, 1934___ __-_______________                                                    27, 488. 96
     Net total expenditures------------------------------394, 442. 29
Unexpended balance June 30, 1934                             6, 824. 89
                                                            7-------------------------
         Total amount appropriated to June 30, 1934------------471, 267.18

        Fiscal year ending June 30                 1930            1931              1932          1933                 1934


Cost of new work----              -----------------------------------------                     $2,406.14       $303,
                                                                                                                 ,    257.93
Cost of maintenance----------------------          $558. 33   .....----------.    $13, 704. 68 ----------.          ....
Total expended-----------------------...            558. 33 ------------ 13,704.68                  636. 87         277, 538. 24
Allotted------------------------------------....$15,000.00                        -1, 295.32   388,000.00           -33,000.00


Balance unexpended July 1, 1933-----------------------------                                              $387, 363. 13
Deductions on account of revocation of allotment      -___                                                  33, 000. 00
      Net amount to be accounted for-----------------------                                                  354, 363. 13
Gross amount expended.. ----------------------------------                                                   277, 538. 24

     Balance unexpended June 30, 1934----------------------76, 824. 89
Amount covered by uncompleted contracts__________ _______ _ 57, 783. 89

        Balance available June 30, 1934------------------------19, 041. 00

Amount (estimated) required to be appropriated for completion of
   existing project 2-----------------                                                                       700, 000. 00

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 2__
                            --
                               __________   _____________   __-_                                                7, 500. 00
                                          PUBLIC WORKS FUNDS

Cost of new work to June 30, 1934------------------------------$58, 192. 22
Cost of maintenance to June 30, 1934______________________                                                   ----
      Total cost of permanent work to June 30, 1934--------------                                             58, 192. 22
Minus accounts payable June 30, 1934 __________________---------_                                              3, 643. 30

        Net total expenditures-----------------------------------                                             54, 548. 92
Unexpended balance June 30, 1934 __--------------                                  ----                       45, 451.08

         Total amount appropriated to June 30, 1934____________--                                            100,000. 00

         Fiscal year ending June 30                1930            1931              1932          1933                    1934


Cost of new work--..---      --      --------------          -------------------- ------------...                   $58,192.22
Cost of maintenance        ---         -----------------------------------------------------                          --------
Total expended_------------------            ---..       -----------      ----- -----------                           54, 548.92
Allotted-....-------------------------------------------------------------- ------------                             100,000. 00
   1 In addition, $27,562.50 was expended from contributed funds.
   2 Exclusive of available funds.
        91536--- NG 1934-     77
1:216      REPORT      OF CHIEF OF ENGINEERS, U. S. ARMY,                                  1934

Amount allotted from National Industrial Recovery Act approved
  June 16, 1933--------------------------------------------                                      $100, 000. 00
                      ---------------------------------_
Gross amount expended__                                                                            54, 548.92
    Balance unexpended June 30, 1934-                                                                45, 451. 08
Amount covered by uncompleted contracts___                                                           45, 451. 08

     CONSOLIDATED      COST AND FINANCIAL SUMMARY                     FOR NIAGARA RIVER,              N. Y.

Cost of new work to June 30, 1934 1----------------------------                                  $461, 418. 79
Cost of maintenance to June 30, 1934_---                                                             18, 704. 68
        Total cost of permanent work to June 30, 1934                              _              480, 123. 47
Minus accounts payable June 30, 1934--                                            --   ___           31, 132.26

        Net total expenditures_________                                                           448, 991. 21
Unexpended balance June 30, 1934__---------------------_                                          122, 275. 97

        Total amount appropriated to June 30, 1934 ----------                                     571, 267. 18


        Fiscal year ending June 30            1930             1931        1932           1933            1934


Cost of new work__________________________   ______    __$2,                               406. 14     $361, 450. 15
Cost of maintenance________-----__________    $558. 33                  $13, 704. 68   __________

Total expended_____________-_________         $558. 33                   13, 704. 68       636. 87      332, 087. 16

Allotted______   __-------------------                   $15, 000. 00   -1, 295. 32    388, 000. 00      67, 000. 00


Balance unexpended July 1, 1933----------------------------    $387, 363. 13
Amount allotted from National Industrial Recovery Act approved
  June 16, 1933-------      -------------------------------     100, 000. 00
     Amount to be accounted for-------------------------                                          487, 363. 13
Deductions on account of revocation of allotment--------------                                     33, 000. 00
      Net amount to be accounted for  -----------------------                                     454, 363. 13
Gross amount expended    ----------------------------------                                       332, 087. 16
    Balance unexpended June 30, 1934--------------------122,    275. 97
Amount covered by uncompleted contracts------------------- 103, 234. 97
         Balance available June 30, 1934------------------------19,                                       041. 00
Amount (estimated) required to be appropriated for completion of
existing project a __-____
                      -      -700,                                                                        000. 00
Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 2____                                                                       7,500. 00

                 14. ROCHESTER (CHARLOTTE) HARBOR, N. Y.

   Location.-On the south shore of Lake Ontario, at the mouth of
the Genessee River, 59 miles westerly from Oswego, N. Y. (See
U. S. Lake Survey Charts Nos. 2 and 241.)
   Previous projects.-Adopted by River and Harbor Acts of March
2, 1829, August 2, 1882, and by authority of the Chief of Engineers
on July 18 1896, and March 2, 1897. The cost and expenditures
were $865,322.95, of which $247,793.88 wvas for new work and $617,-
529.07 for maintenance since 1840. (For further details see page
1971 of Annual Report for 1915.)
   1In addition, $27,562.50 was expended from contributed funds.
   2 Exclusive of available funds.
          RIVERS AND IHARBORS-BUFFALO,       N.   Y., DISTRICT   1217
   Existing project.-This provides for a channel 20 feet deep and
200 feet wide lakeward of and 150 feet wide between parallel piers
of the timber-crib type with concrete superstructure, about 450 feet
apart, from the lake to the pool at the mouth of the Genesee River,
so as to be at all times available for vessels drawing 18 feet, the
west pier to be 3,616 feet long and the east pier 3,109 feet long.
   The project depth is referred to low-water datum for Lake On-
tario, elevation 244 feet above mean tide at New York City. Or-
dinary fluctuations of water surface are from 4 feet above to 0.5
foot below low-water datum, and fluctuations due to winds are
small.
   The estimate of cost for new work, revised in 1910, was $31,680.
exclusive of amounts expended on previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $17,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 2, 1829, provided inferentially for
construction of the piers and a channel 12 feet deep (Annual Report
for 1874, p. 247), modified by the act of August 2, 1882, for exten-
sion of piers and deepening channel to 15 feet (Annual Report for
1881, p. 2437), by authority of the Chief of Engineers, March 2, 1897,
to obtain and maintain a channel not more than 161/2 feet deep at
low water, 200 feet wide (Annual Report for 1897, p. 3270) ; and by
the act of June 25, 1910, for the channel 20 feet deep (H. Doc. No.
342, 61st Cong., 2d sess.) ; concrete superstructure on piers author-
ized under maintenance by the Chief of Engineers in 1905 (An-
nual Report for 1905, p. 2393). The latest published map is in
House Document No. 484, Seventy-second Congress, second session.
   Recommended modifications of project. Under date of October
10. 1932, the Chief of Engineers recommended modification of the
existing project so as to provide for a channel from deep water in
the lake to New York Central Railroad bridge near the mouth of
the river, on an alinement centrally located with respect to the en-
trance piers, and with a width of 300 feet lakeward of the pierheads
and 200 feet shoreward of the pierheads, and a depth of 20 feet. and
for a turning basin of the same depth, 600 feet in width, opposite
the municipal terminal, all at a total estimated cost of $67,000, with
maintenance estimated at $4,000 annually in addition to that now
required. The elimination from the existing project works of 580
feet of the inner end of the west pier, and 410 feet of the inner end
of the east pier is recommended (H. Doc. No. 484, 72d Cong., 2d
sess.).
   Terminal facilities.-Those on the west side of the Genesee River
are 1 trestle, for the shipment of soft coal, located about 3 miles
inside the harbor entrance; 1I car-ferry slip immediately below the
coal trestle for the transfer of railroad cars to ferryboats; 1 wharf
adjoining the car-ferry slip for unloading feldspar from vessel to
car; a railway passenger and freight wharf, about 1,000 feet long,
located 1 mile inside the harbor entrance; 1 municipal passenger
and freight terminal 1,200 feet long, on the west side of the river
between Beach Avenue and the Newv York Central Railroad bridge,
completed in 1932.
   On the east side of the river, opposite the New York Central Rail-
road wharf, there is a sand wharf.
1218     REPORT OF    CHIEF OF ENGINEERS,       U.   S.   ARMY,   1934


   These facilities are considered adequate for the existing commerce.
   Operation and results during fiscal year.-Repairs to about 345
linear feet of the inner end of the west pier were made by contract.
Cost $31,253.28. The U. S. hopper dredge Taylor restored the
entrance channel to project depth. Cost $11,431.90.
   The total cost for maintenance for the fiscal year was $42,685.18,
and the expenditure was $23,686.30.
  Condition at end of fiscal year.-The existing project was com-
pleted in 1913 at a saving of $9,872 under the estimated cost. The
piers were completed in 1895 and the dredging in 1913. The wooden
superstructure has been replaced with concrete on 2,699 feet of the
east pier and 3,086 feet of the west pier. The portions of the piers
having concrete superstructure are in good condition, except that a
portion of the west pier needs minor repairs and reinforcing with a
stone sea slope. The remaining 530 feet at the inner end of the
west pier shoreward of the shore line had not been maintained and
has been recommended for abandonment. Of the remaining 410
feet at the inner end of the east pier, 176.7 feet at the southerly
end are maintained by the New York Naval Militia, 148.5 feet north
is occupied and maintained by the city of Rochester under permit
from the Secretary of War, and the remaining 85 feet is not main-
tained and is in poor condition. The channel is unstable and re-
quires annual redredging to maintain project depths. The con-
trolling depth in the channel between deep water in Lake Ontario
and deep water in the Genesee River, above the inner ends of the
piers, is 20 feet at low-water datum.
   The total cost under the existing project was $369,338.12, of which
$21,808.10 was for new work and $347,530.02 for maintenance. The
total expenditure was $350,191.39.
   Proposed operations.-The balance unexpended at the end of the
year will be applied as follows:
Accounts payable June 30, 1934_...........                        $19, 146. 73
Maintenance: Dredging by U. S. hopper dredge Taylor, April 1935__   8, 202. 89
       Total-----    ------------------ ---------------------          27, 349.62
  Redredging is required annually and protection to the west pier
is necessary. For these items of maintenance funds can be profitably
expended during the fiscal year 1936 as follows:
Dredging by U. S. hopper dredge Taylor----------------------------- $12, 200
Repair and reinforcement of west pier, by contract-----------------  65, 000
       Total                                                                 7, 200
                                                                            7-----------------------

                         Cost and financial summary

Cost of new work to June 30, 1934_-------------------------   $269, 601. 98
Cost of maintenance to June 30, 1934-------------------- ---- 965,059.09

     Total cost of permanent work to June 30, 1934----------       1, 234, 661. 07
Minus accounts payable June 30, 1934                                    9,146. 73
                                                                       1-----------------------

     Net total expenditures                                           215, 514. 34
                                                                   1,-----------------------------
Unexpended balance June 30, 1934-------------------------              27, 349. 62

       Total amount appropriated to June 30, 1934------------..    1,242, 863.96
                  RIVERS AND HARBORS--BUFFALO,                                          N.      Y.,    DISTRICT                1219

          Fiscal year ending June 30                         1930               1931            1932           1933            1934


Cost ofnew work..----------------------------------                                                                                --
Cost of maintenance                        -         .-- :$15, 368. 52   $25, 930. 24        $16, 795. 96   $10, 348. 12     $42, 685. 18
Total expended--         -   -   -    -        ---         27, 787. 64: 25, 758. 21           16, 857. 92    10, 170. 32      23, 686. 30

Allotted___   ----------------------------                 29, 000. 00    16, 000. 00 ------------           11, 198. 50      46, 677. 76


Balance unexpended July 1, 1933 --         _ ______-_-----                                                                 $4, 358. 16
Amount allotted from War Department Appropriation
  Act approved July 14, 1932------------------------$89, 741. 84
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933-------------------------- 10, 300. 00
                                                                                                                        100, 041. 84
           Amount to be accounted for-                                    ---                                           104, 400. 00
Deductions on account of revocation of allotment----------------53, 364. 08

           Net amount to be accounted for-__                                                                      __       51, 035. 92
Gross amount expended--------------------------------------                                                                23, 686.30
      Balance unexpended June 30, 1934---------------------__                                                              27, 349. 62
Outstanding liabilities June 30, 1934_-                         $565. 14
Amount covered by uncompleted contracts-        ---           19, 428. 84
                                                                                                                           19, 993. 98
           Balance available June 30, 1934_---------------------                                                    _       7,355. 64
Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1-_-_-___                       _- __                                                           77, 200. 00

                             15. PULTNEYVILLE HARBOR, NEW YORK

   Location.-This harbor is located on the south shore of Lake
Ontario at the mouth of Salmon Creek. (See U. S. Lake Survey
Chart No. 2.)
   Existing project.-This provides for a channel 8 feet deep and
about 700 feet long from that depth in the lake to the mouth of
Salmon Creek, between 2 timber-crib piers 210 feet apart, west
pier 910 feet long and east pier 572 feet long.
   The project depth is referred to low-water datum for Lake On-
tario, elevation 244.0 feet above mean tide at New York City. Ordi-
nary fluctuations of water surface are from 4 feet above to 0.5 foot
below low-water datum and fluctuations due to wind are small. The
estimated cost for new work, revised in 1875, is $71,000. There is no
approved estimate of cost for annual maintenance.
   The existing project was authorized by the River and Harbor Act
of July 11, 1870. (See Annual Reports for 1874, p. 250; 1875, p. 334;
and 1884, p. 2138.) The latest published map is in House Document
No. 375, Sixty-fourth Congress, first session.
  Recommende'd modifications of project.-The abandonment of this
project was recommended in House Document No. 375, Sixty-fourth
Congress, first session.
   Terminal facilities.-None, and none required.
   Operations and results during fiscal year.-Removal, by contract,
of the outer 398 feet of the west pier was completed during the
   1 Exclusive of available funds.
1220           REPORT OF CHIEF OF ENGINEERS,                                                  U. S. ARMY,      1934

fiscal year at a cost of $684.88 for maintenance. The expenditure
was $3,~59.60.
   Condition at end of the fiscal year.-The existing project was com-
pleted in 1883. The piers are of the timber-crib type, the west
pier being 910 feet long and the east pier 572 feet long. The piers
were completed in 1883. The dredging was completed in 1881. The
last maintenance dredging was done in 1907 and the last pier repairs
made in 1908. The timber superstructures of the piers are badly de-
cayed and most of the superstructures and some of the crib sub-
structures on the lakeward end of the piers have been washed away.
About 398 linear feet of the outer end of the west pier was removed,
as it was considered a menace to small-boat navigation.
   Soundings in June 1931 showed a controlling depth of 2 feet at
low-water datum over the bar .at the mouth of Salmon Creek.
   The total cost under the existing project was $88,305.96, of which
$68,218.66 was for new work and $20,087.30 for maintenance. Total
expenditure was $88,305.96.
   Proposed operations.-No funds are available and no work is pro-
posed and no funds can be profitably expended during the fiscal
years 1935 and 1936.
                                               Cost and financial summary

Cost of new work to June 30, 1934--------------------------- $68,218. 66
Cost of maintenance to June 30, 1934--------------------------20, 087. 30
            Total cost of permanent work to June 30, 1934                                                                88, 305. 96
Net total expenditures                             --------------                                                        88, 305. 96

Total amount appropriated to June 30, 1934--                                                         __                  88, 305. 96


           Fiscal year ending June 30                              1930               1931          1932     1933            1934


Cost of new work--------------------
Cost of maintenance__________----------- ----                __$2,                                            621.08          $684. 88
        Total cost-----------             ------         ----------------------------------                 2, 621.08          684. 88

Total expended----------------------------------------------------46.                                               36       3, 259. 60
Allotted       _     __.--------------------                                 -     ----                     7, 500.00      -4,194. 04


Balance unexpended July 1, 1933--                                                                                        $7, 453. 64
Deductions on account of revocation of allotment__--                                                                      4, 194. 04

           Net amount to be accounted for -_-_-                                                                           3, 259. 60
Gross amount expended ------------------                                                       ---------                  3, 259.60

                                16. GREAT SODUS BAY HARBOR, N. Y.

   Location.-On Sodus Bay, which is a nearly land-locked indenta-
tion of the south shore of Lake Ontario, 29 miles westerly from
Oswego, N. Y. (See U. S. Lake Survey Charts Nos. 2 and 234.)
   Previous projects.-Adopted by River and Harbor Acts of March
2, 1829, and June 23, 1866.                                    The cost and expenditures were $361,-
771.80, all for new work.                                     For further details, see page 1972 of
Annual Report for 1915.
         RIVERS AND HARBORS-BUFFALO,         N. Y., DISTRICT      1221
   Existing project.-This provides for an entrance channel 18 feet
deep and 150 feet wide between parallel piers, and 250 feet wide in
Lake Ontario from deep water in the bay to deep water in Lake
Ontario, the piers to be of the timber-crib type, with concrete super-
structure, 450 feet apart; the west pier to be 1,580 feet long and
the east pier 1,294 feet long, connected at its inner end with a timber-
crib concrete breakwater 1,653 feet long.
   The project depth is referred to low-water datum for Lake On-
tario, elevation 244 feet above mean tide at New York City. Ordi-
nary fluctuations of water surface are from 4 feet above to 0.5 foot
below low-water datum, and fluctuations due to wind are small.
   The estimated cost for new work, revised in 1930, is $99,190, exclu-
sive of amounts expended on previous projects. The latest (1930)
approved estimate for annual cost of maintenance is $12,500.
   The existing project was authorized by the following river and
harbor acts: The act of March 2, 1829, provided inferentially for
the piers and breakwater (Annual Report for 1876, pt. II, p. 589),
modified in 1833 to provide for a channel 150 feet wide and 15 feet
deep (Annual Report for 1874, p. 253), modified in 1882 for extend-
ing the piers to the 15-foot contour in the lake (Annual Report for
1881, p. 2442), concrete superstructure on piers and breakwater
authorized under maintenance by the Chief of Engineers, March
25, 1907 (Annual Report for 1908, p. 2194), modified by the act of
March 3, 1925, to provide for a depth of 18 feet (H. Doc. No. 192,
68th Cong., 1st sess.) ; and modified further by the act of July 3,
1930, to provide for widening the channel in Lake Ontario to 250
feet (Rivers and Harbors Committee Doc. No. 17, 70th Cong., 1st
sess.). The latest published maps are in House Document No. 192,
Sixty-eighth Congress, first session, and Rivers and Harbors Com-
mittee Document No. 23, Seventy-second Congress, first session.
   Recommended modifications of project. Under date of April 19,
1932, the Chief of Engineers recommended modification of the exist-
ing project so as to provide for an entrance channel parallel to the
entrance piers extending from deep water in the lake to deep water
in the bay, 22 feet deep and 300 feet wide to just lakeward of the
pierheads, thence narrowing to 200-foot width with 20-foot depth
between the piers, widening to 300-foot width with 20-foot depth to
deep water in Great Sodus Bay, at an estimated cost of $147,500,
with maintenance estimated at the rate of $2,000 annually in addi-
tion to that now required; subject to certain conditions of local
cooperation (Rivers and Harbors Committee Doc. No. 23, 72d Cong.,
1st sess.).
   Local cooperation.-Fully complied with.
   Terminal facilities.-The Pennsylvania Railroad Co. (Northern
Central division) owns and operates a trestle for the shipment of
hard or soft coal, located on the west side of Great Sodus Bay, 13/4
miles inside the harbor entrance. The railroad company also owns
a wharf about 200 feet long, located about five-eighths mile north-
easterly from the coal trestle, which is in a very dilapidated and
unusable condition. The terminal is open to use by all chartered
water carriers on equal terms. There are no public docks.
   These facilities are considered adequate for existing commerce.
1222        REPORT OF              CHIEF OF        ENGINEERS, U.                S. ARMY,              1934

   Operations and results during fiscal year.-Repairs to approxi-
mately 42 linear feet of the outer end of the west pier were made by
contract. Cost $7,072.80. After completion of the repairs to the
west pier, riprap stone was placed around the end of the pier by
contract. Cost $2,409.86. The U. S. hopper dredge Tafylor restored
the entrance channel to project depth. Cost $5,321.91.
   The total maintenance cost for the fiscal year was $14,804.57, and
the expenditure was $14,730.57.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1931 at a saving of $2,936 under the estimated cost. The
structures are all of the timber-crib type. The superstructure of the
piers and of the east breakwater have been replaced with concrete.
The east breakwater, 1,653 feet, and the west breakwater, 495 feet
long, were completed about 1834; the west pier in 1884; the east pier
in 1886; and the dredging to the present project depth (18 feet) and
width in 1931. The piers are in good condition. The west break-
water is not maintained.
   The controlling depth in the entrance channel at the close of the
fiscal year was 18 feet at low-water datum. The channel is unstable
and requires annual redredging to maintain the project depth.
   The total cost under the existing project was $553,452.89, of which
 $96,253.66 was for new work and $457,199.23 for maintenance. The
total expenditure was $553,430.07.
   Proposed operations.-The balance unexpended at the end of the
year will be applied as follows:
Accounts payable June 30, 1934-------------------                                                                   $22. 82
Maintenance: Dredging by U. S. hopper dredge Taylor, May 1935....                                                6, 451. 76
         Total                                                                                                      474. 58
                                                                                                                 6--------------------------
  Redredging is required annually. The sum of $9,200 can be profit-
ably expended during the fiscal year 1936 in maintenance dredging
by U. S. hopper dredge Taylor.
                                           Cost and financial summary

Cost of new work to June 30, 1934_____________ __---_     $458, 025.46
Cost of maintenance to June 30, 1934 -___-___---__________ 457, 199.23

     Total cost of permanent work to June 30, 1934__________                                                915, 224. 69
Minus accounts payable June 30, 1934__________-________-___                                                       22. 82

     Net total expenditures------------------                                             ------            915, 201. 87
Unexpended balance June 30, 1934                                                                         -6,     474. 58
                                                                                                              6------------------------

         Total amount appropriated to June 30, 1934___.________                                             921, 676. 45

         Fiscal year ending June 30                  1930          1931            1932              1933            1934


Cost of new work-....__-....----.------------_      - $7, 526. 85                $9, 530. 55   .14...-------
                     ------------------- $5, 321.94
Cost of maintenance....                               29, 181.88                  8, 936. 96     $2,745. 15       $14,804. 57
      Total cost_.---------------------             5, 321.94    36,708.73       18,467. 51         2,745.15        14, 804.57

Total expended--.........-------------------        7, 557. 55   21, 871. 64     31, 925. 81        4, 822. 46      14, 7$0. 57

         ---        --------------------
Allotted.............                              18, 000. 00   31, 000. 00 -__-----              13, 491.65        8, 400. 00
           RIVERS AND HARBORS-BUFFALO,           N.   Y., DISTRICT       1223
Balance unexpended July 1, 1933_
                               -------------    __         -__________
                                                                  $12, 805. 15
Amount allotted from War Department Appropriation Act
  approved Apr. 26, 1934_... _______-     __-.______- $5, 200.00
Amount allotted from War Department Appropriation Act
  approved Mar. 4, 1933 ____- ______-___     __    __  3, 200. 00
                                                                    8, 400. 00
      Amount to be accounted for______ . __. _______ ____            21, 205. 15
Gross amount expended______________ _____________                    14, 730. 57
      Balance unexpended June 30, 1934_ _______6_____________6, 474. 58
Outstanding liabilities June 30, 1934__________________ _______  22. 82
       Balance available June 30, 1934__..______      _______-__      6, 451. 76
Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance ------------------------------------       9, 200. 00

                   17. LITTLE SODUS BAY HARBOR, N. Y.

   Location.-On Little Sodus Bay, which is an indentation of the
south shore of Lake Ontario, 115 miles westerly from Oswego, N. Y.
 (See U. S. Lake Survey Charts Nos. 2 and 227).
   Previous projects.-Adopted by river and harbor acts of August
30, 1852; June 23, 1866; and March 3, 1871. The cost and expend-
itures were $232,327.75, all for new work. For further details see
page 1973 of Annual Report for 1915.
   Existing project.-This provides for an entrance channel 151 feet
deep and 150 feet wide from the lake to the bay between parallel
piers of the timber-crib type with concrete superstructure, about 250
feet apart, the west pier to be 1,747 feet long and the east pier 1,810
feet long, connected at its inner end with a timber-crib concrete
breakwater 1,680 feet long.
   The project depth is referred to low-water datum for Lake Onta-
rio, elevation 244 feet above mean tide at New York City. Ordinary
fluctuations of water surface are from 4 feet above to 0.5 foot below
low-water datum, and fluctuations due to wind are small.
   The estimate of cost for new work, made in 1882, was $80,000,
exclusive of amounts expended on previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $8,000.
   The existing project was authorized by the following river and
harbor acts: The act of August 30, 1852, provided inferentially for
the piers (Annual Report for 1874, p. 256), modified in 1871 to pro-
vide for the east pier 250 feet from the west pier and the connecting
east breakwater (Annual Report for 1871, p. 234), modified in 1881
to provide for extending the piers to the 15-foot contour in the Lake
and for a channel 15 feet deep (Annual Report for 1881, p. 2444),
modified by the Chief of Engineers June 29, 1898, to restore and
maintain the entrance channel 150 feet wide and 15 feet deep with-
out further extension of the piers for the present (Annual Report
for 1899, p. 546), modified by the Act of June 13, 1902, to provide
for east pier extension of 300 feet (Annual Reports for 1901, p. 3364)
concrete superstructure on piers and breakwater authorized under
maintenance by the Chief of Engineers in 1905 and 1907 (Annual
  1 Exclusive of available funds.
1224     REPORT     OF    CHIEF OF ENGINEERS,                      U.   S. ARMY,   1934

Report for 1905, p. 2397, and for 1907, p. 2121). The latest pub,
lished map is in the Annual Report for 1881, page 2446.
   Terminal facilities.-The Lehigh Valley Railroad Co. owns and
operates a trestle for the shipment of hard coal, located on the east
side of Little Sodus Bay three-fourths of a mile inside the harbor
entrance. The terminal is open to use by the chartered water car-
riers on equal terms. There are no public docks. These facilities
are considered adequate for existing commerce.
   Operations and results during fiscal year.-The U. S. hopper
dredge Taylor restored the project depth in the entrance channel
at a cost for maintenance of $4,094.52. The expenditure was
$3,317.21.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1906 at a saving of $10,934 under the estimated cost. The
structures are all of the timber-crib type, the piers and 1,600 feet of
the east breakwater having concrete superstructure. The west and
east piers were completed in 1886 and 1906, respectively, and the
dredging in 1896. The piers and the part of the east breakwater
having concrete superstructure are in good condition. The lake face
of one crib and both lake and channel faces in a second crib in west
pier, each 30 feet long, have been breached and repaired with stone
and concrete-block riprap. The lakeward 500 linear feet of the
west pier was riprapped in 1930 to reinforce the pier and prevent
further breaching. The timber superstructure of the remaining
80 linear feet at the east end of the east breakwater is decayed, but
rebuilding is not considered necessary. The west breakwater is
buried in sand and not maintained.
    The controlling depth is 15 feet at low-water datum for the
project width of 150 feet. The channel is unstable and requires
redredging annually.
    The total cost under the existing project was $502,304.64, of
which $69,066.20 was for new work and $433,238.44 for maintenance.
    The total expenditure was $501,434.07.
    Proposed operations.-The balance unexpended at the end of the
year will be applied as follows:
Accounts payable, June 30, 1934------...................       $870. 57
Maintenance (maintenance and improvement funds): Dredging by
  'U.S. hopper dredge Taylor, May 1935-.....      -      - __ 2,230.34

        Total     ----------------------------------------------                          3, 100.91
  Redredging is required annually. The sum of $6,300 can be
profitably expended during the fiscal year 1936 in maintenance
dredging by U. S. hopper dredge Taylor.
                               Cost and financial summary

Cost of new work to June 30, 1934 ,__ _______--------------                          $301,393.95
Cost of maintenance to June 30, 1934_ _----------------------                         433, 238.44

      Total cost of permanent work to June 30, 1934_----------_                       734, 632. 39
Minus accounts payable, June 30, 1934_------------------------                            870. 57

        Net total expenditures-----..-----------------------                          733, 761.82
Unexpended balance, June 30, 1934__--------------------------                            3, 100. 91
        Total amount appropriated to June 30, 1934 ___--------                        736, 862. 73
              RIVERS AND HARBORS-BUFFALO,                                 N.     Y.,    DISTRICT              1225

        Fiscal year ending June 30              1930           1931              1932         1933           1934

Cost of new work---------------------------------------------------------------
Cost of maintenance- -------------------$24,833. 57   $9, 045. 46 $15, 154. 98 $2, 662. 83                  $4, 094. 52
Total expended-    -----------------------15, 760. 68      18, 690. 29         12, 562. 66   5,232. 91       3, 317.21
Allotted ...................
          ----------------------------       26, 000. 00    7, 000. 00          7, 000. 00   4, 900. 00      2, 700. 00


Balance unexpended July 1, 1933__--------------------------    $3, 718. 12
Amount allotted from War Department Appropriation Act approved
   Mar. 4,    1933_____     ____-______                                                                   2, 700.00

      Amount to be accounted for                                                                             418.12
                                                                                                          6,--------------------------
Gross amount expended -----------------------------------------                                           3, 317.21
      Balance unexpended June 30, 1934--------------------------                                          3,100. 91
Outstanding liabilities June 30, 1934--------------------------                                             870. 57
        Balance available June 30, 1934_ _--                   --------                                    , 230. 34

Amount that can be profitably expended in fiscal year ending June 30,
   1936, for maintenance         1_ _-__ __-_---_--__      _    -_ __                          _-         6, 300. 00

                                18. OSWEGO HARBOR, N. Y.

   Location.-On the south shore of Lake Ontario, at the mouth of
the Oswego River, 59 miles easterly from Rochester, N. Y. (See
U. S. Lake Survey Charts Nos. 2 and 22.)
   Previous projects.-Adopted by River and Harbor Acts of March
2, 1827, March 2, 1831, June 23, 1866, July 25, 1868, July 11, 1870,
March 3, 1881, September 19, 1890, the Sundry Civil Act of March 3,
1893, and River and Harbor Acts of August 18, 1894, June 3, 1896,
March 2, 1907, and March 2, 1919. The total costs prior to.the
adoption of the existing project in 1930, were $2,133,661.58, of which
$1,187,977.27 was for new work and $945,684.31 for maintenance since
1881, and the total expenditures were $2,133,661.58. For further
details, see page 1973 of Annual Report for 1915.
   Existing project.-This provides for the maintenance of 145 feet
of the west inner breakwater, for an outer west breakwater 4 359
feet in length, of stone-filled timber crib substructure and concrete
superstructure; and for an arrowhead rubble-mound breakwater sys-
tem, west arrowhead breakwater, 2,700 feet long, east arrowhead
breakwater about 2,200 feet long; for dredging to a depth of 21 feet
at low-water datum in the outer harbor east of the Lackawanna coal
trestle and in the Oswego River north of the north line of Seneca
Street (areas A, C, D, E, F, G, and W); for dredging the outer
harbor west of the east side of the Lackawanna coal trestle (area B),
to a depth of 16 feet; no dredging to be done within 50 feet of
established harbor lines; for removal of a part of the west outer
breakwater, the lighthouse pier, and a part of the west inner break-
water; for the abandonment of the east inner breakwater; for the
elimination from the existing project of the east outer breakwater
never constructed; and for the removal of the upper and lower
islands in the Oswego River. Work on the project is to be initiated
by constructing the breakwater system, by the removal of certain

   1 Exclusive of available funds.
1226      REPORT OF CHIEF   OF ENGINEERS,   U.   S. ARMY,   1934


structures specified herein, and by dredging and rock excavation in
areas A and C, at an approximate cost of $2,200,000, the remainder
o~ the work not to be undertaken until local interests have given
assurances satisfactory to the Secretary of War and the Chief of
Engineers that suitable terminal facilities will be constructed requir-
ing tihe improvements contemplated.
   The' pr ject depths are referred to low-water datum for Lake On-
tario, elevation 244.0 feet above mean tide at New York City.
Ordinary fluctuations of water surface are from 4 feet above to 0.5
foot below low-water datum, and fluctuations due to wind are small.
   The estimate of cost for new work, revised in 1932, is $3,435,000,
which includes $1,188,000, the cost of that part of outer west break-
water included in the existing project. The latest (1930) approved
estimate for annual cost of maintenance is $33,000.
   The existing project was authorized by the following river and
harbor acts: The act of July 11, 1870, provided inferentially for an
outer breakwater to form the outer harbor (Annual Report for 1870,
pp. 54, 220, 221), modified by the act of March 2, 1907, for stone
riprap and concrete superstructure under plan (a) (H. Doc. No. 55,
58th Cong., 2d sess.), and further modified by the River and Harbor
Act of July 3, 1930, providing for the other features of the project
 (Rivers and Harbors Committee Document No. 24, 71st Cong., 2d
sess.).
   The latest published map is in the last-mentioned document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-The State of New York has built a terminal
wharf, 1,000 feet long and 150 feet wide, just west of the river en-
trance. It has a mooring channel on each side 100 feet wide and 23
feet deep at low water. The cost of the work was $348,684. A sec-
ond State-owned terminal is located along the east bank of the river
from the south side of Cayuga Street to the north side of Seneca
Street, about 600 feet long.
   Terminal facilities now existing, in addition to the two State
terminals above mentioned, consist of 2 coal trestles, 1 in the outer
harbor and 1 on the east side of Oswego River; about 20 platform
wharves, all but 4 being in the inner harbor; 1 pulpwood wharf in
the inner harbor; 1 passenger wharf on the river having a frontage
of 200 feet; and 4 public wharves at the ends of public streets, used
only for occasional unloading of sand and gravel for public works.
   Operations and results during)fiscal year.-The construction of a
stone sea slope along the lake face of 3,850 feet of the west outer
breakwater, by contract, was completed during the fiscal year. Cost
$137,127.60. Minor repairs to the east breakwater pier head were
made by contract. Cost $4,005.14. Government plant and hired
labor removed shoals in the outer harbor and entrance channel in
the lake. Cost $2,580.80. Deepening the west outer harbor channel
and turning basin and removing rock shoals in the entrance channel
and outer harbor, by contract, was in progress at the end of the fiscal
year. The removal of shoals in the outer harbor was about 80 per-
cent completed and deepening of the turning basin was completed
at the end of the fiscal year. Cost $35,303.51.
   The total cost was $179,017.05 for maintenance, and the total
expenditure, $183,975.82.
            RIVERS AND HARBORS-BUFFALO,                  N.      Y.,   DISTRICT      1227

   Condition at end of fiscal year.-The existing project is 89 percent
completed. Under the existing project there have been constructed
a west inner breakwater; a west outer breakwater, completed in 1882;
a west arrowhead breakwater 2,700 feet long, completed in 1931; and
an east arrowhead breakwater 2,200 feet long, completed in 1932.
The west outer breakwater was originally 6,032 feet long, but was
reduced to 4,359 feet in 1931 by the removal of 1,673 feet. The old
lighthouse pier and a part of the west inner breakwater, together
with the upper and lower islands in the Oswego River were removed
in 1931. The Oswego River, to the north line of Seneca Street, and
the outer harbor east of the Lackawanna coal trestle have been deep-
ened to the project depth of 21 feet, except a strip about 200 feet wide
along the harbor line east of the mouth of the Oswego River.
   The west outer breakwater consists of a stone-filled timber-crib
substructure with a concrete superstructure. A stone sea slope was
constructed along its lake face to reinforce the stone riprap previ-
ously placed. The concrete superstructure has settled in places and
will require repairs. The arrowhead breakwaters are rubble-mound
structures and are generally in good condition. The east inner
breakwater has been abandoned and all but 175 feet of the west inner
breakwater has been removed. The portion remaining is maintained
for a wharf for Government plant.
   A depth of 21 feet at low-water datum is available in the Oswego
River to the north line of Seneca Street and in the outer harbor east
of the Lackawanna coal trestle except in a 200-foot wide strip along
the harbor line east of the mouth of the Oswego River. The 100-foot
channel in the outer harbor west of the Lackawanna coal trestle is
being dredged to a depth of 17 feet and will be completed during
August 1934.
   The work remaining to be done to complete the project is the deep-
ening of the 200-foot strip along the harbor line east of the mouth
of the Oswego River, and the completion of the deepening of the
outer harbor west of the Lackawanna coal trestle to the full width
of 400 feet.
   The total cost was $3,336,556.33, of which $3,041,691.98 was for new
work and $294,864.35 for maintenance. The total expenditure was
$3,330,469.69.
   Proposed operations.--The balance unexpended, including accounts
receivable, at the end of the year will be applied as follows:
Accounts payable June 30, 1934-----------------------------                       $8, 281. 93
Maintenance:
    Dredging to restore project depth in the channel through west-
      outer harbor and removing shoals, by contract, July-August
      1934---------------------------------------------                           48, 848. 13
    M nor repairs to breakwater by Government plant, May 1935__                    5, 000. 00

       Total--                                                                    62. 130.06
  Redredging is required periodically and minor repairs to break-
waters are necessary. For these items of maintenance, funds can
be profitably expended during the fiscal year 1936 as follows:
Dredging channel in west basin by contract-------------------                       $50,000
Repairs to breakwaters by Government plant                                           10, 000
       Total____________
                      -----                      -------------                       60, 000
1228           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                                1934

                                                 Cost and financial swummary

Cost of new work to June 30, 1934------------------------ $4, 229, 669. 25
Cost of maintenance to June 30, 1934--------------------- 1,240, 548.66
      Total cost of permanent work to June 30, 1934--------- 5, 470, 217. 91
Value of plant, materials etc., on hand June 30, 1984----------   2, 184. 29

      Gross total costs to June 30 ,1934-------------------     5, 472, 413. 20
Plus accounts receivable June 30, 1934    -----------------------        11.00

      Gross total costs to June 30, 1934 --------------------                                                            5, 472, 413. 20
Minus accounts payable June 30. 1934           --                                                                             8, 281. 93

     Net total expenditures----------------------------- 5, 464, 131. 27
Unexpended balance June 30, 194 ---------------------------  62, 119. 06

           Total amount appropriated to June 30, 1934----------                                                          5, 526, 250. 33

    Fiscal year ending June 30                          1930                1931              1932               1933               1934


Cost of new work-...-------.----------------$317, 715. 28 $1, 225, 841. 67                                    $310, 135. 03                  -
Cost of maintenance------------   $23, 381. 39 49, 053. 49 ------------                                         66, 606. 97       $179, 017. 05
        Total cost----------------                     23, 381. 39       366, 768. 77    1, 225, 841. 67       376, 742. 00        179, 017. 05
Total expended                     ...-----------------. 25, 540. 60     192, 940. 15    1, 308, 664. 89       453, 515. 78        183, 975. 82
Allotted. ----------------------                       65, 000. 00     1, 312, 000. 00     351, 000. 00        418, 043. 76         53, 122. 58


Balance unexpended July 1, 1933-_________                                                                                     $192, 972. 30
Amount allotted from War Department Appropriation
    Act approved Apr. 26, 1934-----------------                                                       $4, 000. 00
Amount allotted from War Department Appropriation
Act approved Feb. 23, 1931-----------------------                                                         4, 194. 04
Amount allotted from Emergency Relief and Con-
struction Act approved July 21, 1932.         ---                                                     8, 000. 00
                                                                                                      1--
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933---------------------                                                       27, 000. 00
                                                                                                                                53, 194. 04

     Amount to be accounted for__---------------------_                                                       ------           246, 166. 34
Deductions on account of revocation of impounded funds                                                                               71. 46

      Net amount to be accounted for    -----------------                                                                      246, 094. 88
Gross amount expended------------------------ $186, 268. 29
Less reimbursements collected-------------          2, 292. 47
                                                                                                                               183, 975. 82

      Balance unexpended June 30, 1934- -...                                                                                    62, 119. 06
Outstanding liabilities June 30, 1934             $4, 599. 70
Amount covered by uncompleted contracts----------36, 071. 65
                                                                                                                                40, 671. 35

      Balance available June 30, 1934------------------------   21, 447. 71
Accounts receivable June 30, 1934------------------------------      11. 00

            Unobligated balance available June 30, 1934---------------                                                          21, 458. 71

Amount (estimated)                        required to be appropriated for completion
     of existing project 1----------------                                                                                     364, 000. 00

Amount that can be profitably expended in fiscal year ending June
  30, 1936, for maintenance ---       ----        -----        ___                                                              60, 000. 00

     1Exclusive of available funds.
         RIVERS AND HARBORS-BUFFALO,            N.   Y., DISTRICT       1229
                   19. CAPE VINCENT HARBOR, N. Y.

   Location.-On the south bank of the St. Lawrence River, 21/
miles from Lake Ontario and 49 miles northerly from Oswego, N. Y.
(See U. S. Lake Survey Chart No. 2.)
   Previous projects.-Adopted by act of June 3, 1896. The cost and
expenditures were $247.29 for surveys, and charged to new work.
For further details of previous project see page 1975 of Annual
Report for 1915.
   Existing project.-This provides for a timber-crib breakwater
1,500 feet long in the St. Lawrence River parallel to and 500 feet
from the railroad wharf, 150 feet, or as much of the breakwater as
required, to be shore return at the upper end.
   The estimate of cost for new work, revised in 1926, is $252,000,
exclusive of amounts expended under previous projects. The latest
 (1918) approved estimate for annual cost of maintenance is $500.
   The existing project was adopted by the River and Harbor Act of
March 3, 1899 (Annual Report for 1897, pp. 3286-3288). The latest
published map is in the Annual Report for 1903, page 2165.
    Terminal facilities.-The package-freight and passenger wharf of
the New York Central Railroad Co., also used by the passenger ferry
to and from Kingston, Ontario, Canada; 1 hay wharf; 1 fueling
wharf; and 1 private merchandise wharf having no railroad con-
nection.
    These facilities are considered adequate for the existing commerce.
    Operations and results during fiscal year.-None.
    Condition at end of fiscal year.-The project is 79 percent com-
pleted. The work done under the existing project has been the con-
struction of a breakwater 1,381.3 feet long, of which 50 feet of the
upstream end is shore return. The breakwater is of the timber-crib,
concrete-superstructure type, and is in good condition, except that
the surface of the concrete is disintegrating and is scaled off to a
depth of 3 or 4 inches in places. The available depth in the ap-
proach to and around the breakwater is 17 feet at low-water datum.
The work remaining to be done to complete the project is the con-
struction of 168.7 linear feet of breakwater, which is considered un-
necessary at the present time.
    The total cost under the existing project to the end of the fiscal
year was $226,752.71, of which $198,819.03 was for new work and
 $27,933.68 for maintenance. The total expenditure was $226,752.71.
    Proposed operations.-No funds are available and no work is pro-
posed during the fiscal year 1935.
    The concrete superstructure on the breakwater requires repairs.
The sum of $25,000 can be profitably expended for this mainte-
nance work, by contract, during the fiscal year 1936.
                         Cost and financial summary

Cost of new work to June 30, 1934________________________   $199, 066. 32
Cost of maintenance to June 30, 1934 ____________________ _   27, 933. 68

      Total cost of permanent work to June 30, 1934                 227, 000. 00
Net total expenditures___                                           227, 000. 00
Total amount appropriated to June 30, 1934______________________    227, 000. 00
1230           REPORT    OF CHIEF OF ENGINEERS,                   U.   S. ARMY,     1934


         Fiscal year ending June 30           1930        1031         1932       1933       1934

Cost ofnew work-............  .......
                        .......     .                . . ...--.
Cost ofmaintenance--------------------        $539. 35    $326. 32
Total expended....-------------------------    518. 75     336. 92
Allotted.---


Amount (estimated) required to be appropriated for completion of
existing project   --------------------------------------- $53, 200. 00
Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance    --------------------------------                           25, 000. 00
20. ST. LAWRENCE RIVER BETWEEN OGDENSBURG, N. Y., AND LAKE
                          ONTARIO
   Location.-This river is the outlet from the Great Lakes. It lies
along the international boundary between the United States and
Canada from its head at Lake Ontario to the mouth of the St. Regis
River. (See U. S. Lake Survey Charts-St. Lawrence River Nos. 3,
4, 5, and 6, Index Nos. 13, 14, 15, and 16; and Coast Chart No. 1,
Index No. 21.)
   Previous        projects.-The
                             act of September 19, 1890, modified in
1893, 1896, and 1897, provided for the removal of rock ledges to a
depth of 18.4 feet. Expenditures on these projects prior to the
adoption of the existing project in 1930 amounted to $68,000 for new
work.
   Existing project.-This provides for the removal of shoals lying
in United States waters, to a depth of 27 feet, to secure a safe channel
with a least width of 450 feet between Ogdensburg, N. Y., and Lake
Ontario.
   The project depth is referred to the sloping river surface when
Lake: Ontario is at low-water datum, elevation 244 feet above mean
tide at New York City. This river surface slopes from elevation
244 feet at Lake Ontario to elevation 243.63 at Ogdensburg, N. Y.
Ordinary seasonal fluctuation of water surface is from about 4
feet above to 0.5 foot below low-water datum. Other fluctuations,
due to wind and other causes, are small.
   The estimate of cost of new work, made in 1930, is $550,000, exclu-
sive of amounts expended on previous projects. Maintenance is not
necessary.
   The existing project was adopted by the River and Harbor Act of
July 3, 1930. (H. Doc. 316, 70th Cong., 1st sess.) The latest pub-
lished maps are in the project document.
   Terminal facilities.-The improvement serves the through com-
merce between the Great Lakes and ports on the St. Lawrence River
and through traffic through the St. Lawrence Canals to tidewater.
The only terminal facilities along this portion of the river are
located at small ports such as Cape Vincent, Clayton, Alexandria
Bay, Morristown, and Ogdensburg, and on the Canadian side the
ports of Brockville and Prescott. The only United States port that
has facilities adequate to use the full dimension of the present chan-
nel is Ogdensburg, N. Y. Its terminal facilities are described in
detail in annual report for that harbor.
                   RIVERS AND HARBORS                       BUFFALO,                 N. Y., DISTRICT                          1231
  Operations and results during fiscal year.-The removal of 13
shoals lying in United States waters between Ogdensburg, N. Y., and
Lake Ontario, which was begun under contract during the fiscal year
1931 was completed during the fiscal year. The cost for the fiscal
year was $56,877.50 for new work and the expenditure was $74,499.90.
  Condition at end of fiscal year.-The project is completed, except
for securing a width of 450 feet in the narrow sections of the channel
and deepening the existing channel, where necessary, to secure project
depth at the new datum plane, all provided for conditionally and
without estimate. The shoal removal completed by contract during
the fiscal year provided a channel from Ogdensburg, N. Y., to Lake
Ontario, 27 feet deep, referred to the sloping river surface when
Lake Ontario is at the old low-water datum, elevation 244.5 feet,
which is 0.5 foot above the existing low-water datum of 244 feet.
  The total cost under the existing project was $434,833.22 all for
new work. The total expenditure was $434,833.22.
  Proposed operations.-The balance unexpended, $14,355.22, at the
end of the year will be expended for surveys, sounding, sweeping,
and probing in parts of the channel. No work is proposed for the
fiscal year 1936.
                                      Cost and financial sum mary

Cost of new work to June 30, 1934-----------------------------                                                         $502, 833. 22
Cost of maintenance to June 30, 1934 .......
            Total cost of permanent work to June 30, 1934___-                                                           502, 833. 22

Net total expenditures---                                                                                               502, 833. 22
Unexpended balance June 30, 1934-_-------__                                                                              14, 355. 22

            Total amount appropriated to June 30, 1934__                                                                517, 188. 44

     Fiscal year ending June 30               1930             1931                      1932             1933               1934


Cost of new work------------         --------------..         $8, 345. 29         $236, 783. 38       $132, 827. 05        $56, 877. 50
Cost of maintenance       --------          --      -----   ---------            -----       ---   -------------           -------
        Total cost-------------      --------------            8, 345. 29          236, 783.38          132, 827. 05        56, 877. 50
Total expended----- ------------------                         6, 213. 51          171, 256. 58         182, 863. 23        74, 499. 90

Allotted-------------             --------------             450, 000.00         -114,000.00            113, 239. 52           -51. 08


Balance unexpended July 1, 1933------------------------------$88, 906.20
Deductions on account of revocation of impoundments ------------   51. 08

           Net amount to be accounted for                                                                                88, 855. 12
Gross amount expended__                                 -       -           --           -              ---              74, 499. 90

           Balance unexpended               June 30, 1934 ----                      -                                    14, 355. 22

                             21. OGDENSBURG HARBOR, N. Y.

  Location.-This harbor is located on the south bank of the St.
Lawrence River, 62 miles by water from Lake Ontario. (See U. S.
Lake Survey Chart 13.)
  Previous projects.- Adopted by River and Harbor Acts of March
2, 1867, August 2, 1882, and September 19, 1890; by authority of
the Chief of Engineers, dated February 27, 1897; and by act of
           91536- ENG 1934--         78
1232    REPORT   OF CHIEF OF ENGINEERS,     U.   S. ARMY,   1934

March 3, 1899. The cost and expenditures were $401,892.14, of which
$271,379.82 was for new work and $130,512.32 for maintenance. For
further details of previous projects see page 1975 of Annual Report
for 1915.
   Existing project.-This provides for an upper entrance channel 19
feet deep and 400 feet wide; for a channel 19 feet deep and 350 feet
wide along the city water front; and for a,lower entrance channel
and basin 19 feet deep, 1,600 to 2,100 feet wide, along the lower
wharf frontage.
   The project depth is referred to the sloping river surface when
Lake Ontario is at low-water datum, elevation 244 feet above mean
tide at New York City. Ordinary seasonal fluctuations of water
surface are from about 3.9 feet above to 0.5 foot below low-water
datum. Other fluctuations, due to wind and other causes, are small.
   The estimate of cost for new work, revised in 1919, was $259,970,
exclusive of amounts expended on previous projects. The latest
 (1928) approved, estimate for annual cost of maintenance is $5,000.
   The existing project was adopted by the following river and har-
bor acts: The act of June 25, 1910, provided for the several channels
19 feet deep and generally 300 feet wide (H. Doc. No. 920, 60th
Cong., 1st sess.) ; and the act of March 2, 1919, provided for widening
of the upper entrance channel to 400 feet and of the city-front chan-
nel to 350 feet (H. Doc. No. 663, 64th Cong., 1st sess.). The latest
published maps are in House; Document No. 663, Sixty-fourth Con-
gress, first session, and House Document No. 266, Seventy-second
Congress, first session.
   Supplementing the work authorized by Congress, the deepening
of the lower basin to 21 feet and the removal of the old elevator
wharf, as recommended by the Chief of Engineers in House Docu-
ment No. 266, Seventy-second Congress, first session, has been in-
cluded in the Public Works program under the National Industrial
Recovery Act.
   Recommended modifications of project.-Included in Public
Works program.
   Local cooperation.-Fully complied with.
   Terminal facilities.-The principal freight wharves are those of
the New York Central Railroad Co. and the Rutland Railroad Co.
The former is located on the west side of the Oswegatchie River.
Transfer of freight between Ogdensburg and Prescott, Ontario, Can-
ada, is by car ferry. The Rutland Wharf is situated in the lower
harbor, with a frontage of 2,300 feet.
   There are 2 grain elevators, 1 with a storage capacity of 500,000
bushels and the other of 90,000 bushels; 4 coal docks for handling
and storing both hard and soft coal; 1 lumber wharf, little used; 2
small wharves, known as the " Plumb" and " Hacket ", are used
mainly for summer passenger traffic, excursion boats; 1 wharf used
by a passenger ferry that operates during the entire year between
Ogdensburg and Prescott, Ontario, Canada. on the opposite shore of
the St. Lawrence, a distance of about 1 mile. Generally the wharves
are open to all water carriers on equal terms. There is also 1 public
wharf located in the central harbor used as a passenger landing
during the summer months, open to all water carriers free of charge.
            RIVERS   AND HARBORS-BUFFALO,         N.   Y.,   DISTRICT        1233
   These facilities are considered adequate for the existing commerce.
    Operations and results during fiscal year.-The U. S. hopper
dredge Taylor restored the project depth in the upper and lower
.entrance   channels and the city front      -channel
                                                    at a cost for main-
tenance of $12,517.20. The expenditure was $10,520.77, all from
regular funds.
   Under the work authorized by the Federal Emergency Adminis-
tration of Public Works for dredging the lower basin and remov-
ing the old elevator wharf, soundings were taken over the lower
>basin, and contract dredging and removal of the old elevator wharf
were begun. The work was about 3 percent completed at the end
of the fiscal year.
    The cost of this new work for the fiscal year was $10,642.17, and
the expenditure was $1,189.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1919 at a saving of $59,433 under the estimated cost. The
upstream entrance channel has a controlling depth of 19 feet. The
Oswegatchie River from Lake Street Bridge to its mouth has a con-
trolling depth of 18 feet; the city-front channel from the mouth of
Oswegatchie River to the Rutland Railroad car-ferry dock has a con-
trolling depth of 19 feet; and the lower entrance channel and basin
have a controlling depth of 19 feet.
    The total cost of the existing project at the end of the fiscal year
was $350,274.59, of which $200,536.61 was for new work and
 $149,737.98 for maintenance.
    The total expenditure was $347,961.02.
    The work authorized by the Public Works Administration is 3
percent completed. Deepening and enlarging of the lower basin and
removal of the old elevator wharf, by contract, in force at the end
of the fiscal year, will complete the work authorized.
    The total cost of this new work to the end of the fiscal year was
 $10,642.17. The total expenditure was $1,189.
    The total cost, all funds, was $360,916.76, of which $211,178.78 was
for new work and $149,737.98 for maintenance. The total expendi-
ture was. $ 49,150.02.
    Proposed operations.-The balance unexpended at the end of the
year will be applied as follows:
                                                     ------
Regular funds: Accounts payable June 30, 1934 _________--         $2,313.57
Maintenance: Dredging by U. S. hopper dredge Taylor, June 1935___ 14, 841.56

      Total     ---------------------------------------------            17, 155. 13
   The balance unexpended of allotment from the National Indus-
trial Recovery Act will be applied as follows:
Accounts payable June 30, 1934__________________-_-__-------         $9, 453. 17
New work: Complete deepening to 21 feet and enlarging the lower
  turning basin, and removing the old elevator wharf by contract in
force July 1934-June 1935--         ---------------
                               _________-                           176, 357. 83

      Total-----------------------------------------------              185, 811. 00
  Redredging is required annually and the sum of $19,000 can be
profitably expended during the fiscal year 1936 in maintenance
dredging by U. S. hopper dredge Taylor.
1234          REPORT OF CHIEF OF ENGINEERS,                               U. S. ARMY,             1934

                                       Cost   nd,financial summary
                                 MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934                                                                       $471, 916. 43
Cost of maintenance to June 30, 1934 -----------------------                                             280, 250. 30
      Total cost of permanent work to June 30, 1934 ----------                                           752, 166. 73
Minus accounts payable June 30, 1934_-----__.--__                                                          2,313. 57
     Net total expenditures_---- ----------        -                               --       --           749, 853.16
Unexpended balance June 30, 1934___- --------------                                                       1-----,
                                                                                                          17, 155.13
            Total amount appropriated to June 30, 1934 ___________                                       767, 008. 29

          Fiscal year ending June 30               1930            1931         1932          1933             1934

Cost of new work-                    --
Cost of maintenance------------------- $5, 986. 95            $16, 229. 20    $9, 185.42   $44, 064. 18     $12, 517. 20
Total expended -------------------------
                    .....                          724. 51     15, 514. 46     8,917. 76   49, 989. 88       10, 520. 77
Allotted.         --------------------------
                      ..--                      15, 000. 00    33, 500.00 -14,000.00        45, 000. 00      22, 600. 00


Balance unexpended July 1, 1933------   ----------- ---------- $5, 075. 90
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934_......__.    __--- -    $14, 500. 00
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933-----------------------    8, 100. 00
                                                                 22, 600. 00

      Amount to be accounted for-- -------------------------                                              27, 675. 90
Gross amount expended-----------------------------------                                                  10, 520. 77

      Balance unexpended June 30, 1934_-                      17,155. 13
                                               -___-__---------
Outstanding liabilities June 30, 1934_ . __________----_---.   2,313. 57
            Balance available June 30, 1934_                  __          _--__-______                    14, 841.    56
Amount that can be profitably expended in fiscal year ending June
                           1- - - - - - - - - - - - - - - - - -- - -- - -- - -
30, 1936, for maintenance                                                     _                          19,000. 00
                                          PUBLIC   WORKS FUNDS

Cost of new work to June 30, 1934  -------------------------- $10, 642. 17
Cost of maintenance to June 30, 1934.....____. ______     ___   ......

      Total cost of permanent work to June 30, 1934 __---__                                         _     10, 642. 17
Minus accounts payable June 30, 1934 ___9-__.     _____.                                                   9____
                                                                                                           9,453. 17

     Net total expenditures--__-----    __--__                                        _____-1,      189. 00
Unexpended balance June 30, 1934_____1__-                                    -_____________    185, 811.00'
            Total amount appropriated to June 30, 1934_____________                                      187, 000. 00

            Fiscal year ending June 30             1930            1931         1932             1933          1934


Cost of new work--___------------    --                                - -                         $10, 642. 17
Cost of maintenance.......................
                                                               -
                                               -------------- --------
                                               ------------      ------------ ------------ ------------   21

Total expended ....    .......     .                                                                           1, 189. 00
Allotted ............... ...                                                                                 187, 000. 00

   t
       Exclusive of available funds.
                  RIVERS AND HARBORS-BUFFALO,                                                N. Y., DISTRICT                    1235
Amount allotted from National Industrial Recovery Act approved
  June 16, 1933--------------------------------------------- $187, 000. 00
Gross amount expended----------------------------------------    1, 189.00

     Balance unexpended June 30, 1934-..............                                                                    185, 811. 00
Amount covered by uncompleted contracts------------------                                                               163, 811. 00

                                         ---------------------------
           Balance available June 30, 1934_                                                                                 22, 000.00

   CONSOLIDATED COST AND FINANCIAL SUMMARY FOR OGDENSBURG HIARBOR,                                                            N. Y.

(Cost of new work to June 30, 1934----------------------------
Cost of maintenance to June 30, 1934----------------------------
                                                                                                                       $482, 558. 60
                                                                                                                        280, 250.30


-Minus     Total cost of permanent work to June 30, 1934----------
            accounts payable June 30, 1934--------------------------11,
                                                                       762, 808. 90
                                                                            766. 74

      Net total expenditures_ ----------------------------------                                                         51, 042. 16
Unexpended balance June 30, 1934-----------------------------                                                           202, 966. 13

           Total amount appropriated to June 30, 1934--------------                                                     954, 008. 29

           Fiscal year ending June 30                            1930             1931            1932          1933            1934


Cost of new work _                    .            ..---------------...                       .......-- --- --- -             $10,642.17
Cost of maintenance----                   -------------- $5, 986. 95          $16, 229. 20     $9,185. 42 $44, 064.18          12, 517. 20

        Total cost                    .                           5,986. 95
                                             __-----------------------         16, 229. 20       9, 185. 42   44, 064. 18      23, 159. 37

'Total expended---------------------------                         724. 51     15, 514. 46       8,919. 76    44, 989. 88      11, 709. 77

Allotted---------------------------                            15, 000. 00     33, 500. 00 -14,000. 00        45, 000. 00     209, 600. 00


Balance unexpended July 1, 1933------ ---------------                                                                       $5, 075. 90
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934------------------------ $14, 500.00
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933----------------------       8,100. 00
Amount allotted from National Industrial Recovery Act
  approved June 16, 1933----------------------------  187, 000. 00
                                                                                                                        209', 600. 00
      Amount to be accounted for-----------------------------    214, 675. 90
Gross amount expended----------------------------------------11,      709.77

      Balance unexpended June 30, 1934------------------------ 202, 966. 13
Outstanding liabilities June 30, 1934------------------- $2,313. 57
Amount covered by uncompleted contracts-------------163, 811. 00
                                                                    166,124. 57

           Balance available June 30, 1934-----------                                                                       3, 841. 56

Amount that can be profitably expended in fiscal year ending June
   30, 1936, for maintenance 1____------                                                      --------                      19, 000. 00

    22. EXAMINATIONS,                           SURVEYS, AND CONTINGENCIES (GENERAL)
   The cost of the work during the year amounted to $59,166.96; the
'expenditures were $61,502.94. The balance unexpended June 30,
1934, $26,497.06, will be applied as needed during the fiscal year 1935
to payment of expenses incurred in connection with the above items.
The additional sum of $35,000 can be profitably expended during the
fiscal year 1936.
   'Exclusive of available funds.
1236           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                                 1934

                                                Cost and financial summary
Cost of maintenance to June 30, 1934--__-                                   _____________________                             $233, 046. 79'
Minus accounts payable June 30, 1934--                                                                                           3, 013. 71

     Net total expenditures____________________                                                                                 230, 033. 08.
Unexpended balance June 30, 1934_____________________________                                                                    26, 497. 06
             Total amount appropriated to June 30, 19,34________                                                                 256 530.14


             Fiscal year ending June 30                      1930              1931              1932                1933                  1934


Cost of new work .......
Cost of maintenance------------------                    $19,515.63      $37, 120.04       $54, 818.82          $47, 220.57              $59, 166. 96
Total expended-----          --     -----                 21, 068. 19     32, 216. 61          57, 291. 24        44, 409. 17             61, 502. 94
Allotted      ----------------------------...             18, 000. 00     49, 000. 00          37, 888. 49        54, 838. 16             70, 803. 49


Balance unexpended July 1, 1933------------------------------     $17, 196.51
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934----------------------    $15, 000.00
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933_____________________      55, 925. 09
                                                                   70, 925. 09

     Amount to be accounted for-------------------------------                                                                     88, 121. 60
Deduction on account of revocation of impounded funds--------                                                                          121.60
      Net amount to be accounted for ____________--                    000. 00
                                                            -_________-88,
Gross amount expended_______________________        ___ $78, 447. 72
Less reimbursements collected___________
                               --               ___ _ 16, 944.78
                                                                                                                                   61, 502. 94

      Balance unexpended June 30, 1934 _______ -_____        _ _..._
                                                                   26, 497. 06
Outstanding liabilities June 30, 1934-----------------------------6, 065. 81
             Balance available June 30, 1934 ___________________                                                    _              20, 431.25"

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1___________________________________                                                                    35, 000. 00

                    23. Other projects for whikchno estimates are submitted
                         [Commercial statistics for these projects are given in pt. 2 of report]

                                                                     For last         Cost and expenditures to
                                                                        full                June 30, 1934                               Estimated
                       Name of project                              report
                                                                     annual
                                                                             see   _required
                                                                                                                                         amount to
                                                                      report                                                            complete
                                                                       for-           New work          Maintenance

1. Vermilion Harbor, Ohio 1 2____                      _______          1932          $133, 277. 55          $51, 009. 64 ----                    --
2. Sackets Harbor, N. Y.2 ---                     __                    1898           3 20, 000. 00    --------------.--------------

3. M orristown Harbor, N. Y.2--- -...-------                         -_ 1931             6, 220. 93                 479. 07        -........-.....
4. Waddington Harbor, N. Y.2- ------                                - 1932              35, 500. 00-$20,                                          000

  1 Revoked $14,500, fiscal year 1933.
  2 Channels and protection adequate for commerce.
  3 Amount includes maintenance. Not separable.
  4 No work has been done on the existing project and none proposed pending consideration of major
improvement ;of St. Lawrence River.

      1   Exclusive of available funds.
          RIVERS AND              HARBORS-LOS ANGELES,                                CALIF., DISTRICT                      1237
Status of reports called for by river and harbor acts and committee resolutions

                                                        Transmitted                                                   Recommen-
         Locality               Authorization act
                                                        to Congress
                                                                                           Doc. No.                     dation
                          -i




Conneaut Harbor, Ohio_ Rivers and Harbors
                         Committee resolu-
                        tion, June 13, 1934.
Dunkirk Harbor, N. Y__ Rivers and Harbors               Oct.    31, 1933                     ....                    Unfavorable.
                                Committee resolu-
                                tion, June 1, 1932.
Great  Lakes-Atlantic          Rivers and Harbors
Tidewaters   deeper             Committee resolu-
waterways.                     tion, Mar. 7, 1928.
Great Lakes to Hudson          Rivers and Harbors        Sept. 28, 1.933     Rivers and Harbors                      Favorable.
  River waterway.                Committee resolu-                               Committee, 20, 73d
                                tion, May 26, 1932.                              Cong., 2d sess.
   Do-    .... ..   .......    Rivers and Harbors                          .........................-
                                 Committee resolu-
                                tion, Feb. 2, 1934.
Great Lakes-St. Law-                                    Jan.    10, 1934     Senate committee, 116,                      Do.
rence seaway.                                                                73d Cong., 2d sess.
Lorain Harbor, Ohio __         Senate committee res- June        8, 1934      .--    .... __ --- --                      Do.
                                olution, May 11,
                         1933.
Oswego Harbor, N. Y___ Rivers          and Harbors       Sept. 19, 1934    .....................                         Do..
                                Committee     resolu-
                          tion, Dec. 16, 1932.
Sackets Harbor, N. Y___ Rivers and Harbors              Apr. 24, 1934        ....                       .....        Unfavorabl'e.
                                Committee     resolu-
                                 tion, Aug. 29, 1933.
Wilson Harbor, N. Y___         River and Harbor Act,    July     6, 1933   ...      . . . .              . . . . .       Do.
                                 July 3, 1930.



IMPROVEMENT OF RIVERS AND HARBORS IN THE LOS
          ANGELES, CALIF., DISTRICT

   This district comprises that part of California which lies south
of Cape San Martin (about 265 miles north of the entrance to Los
Angeles Harbor) and south of the San Joaquin Valley drainage
basin, together with the drainage basin of the Colorado River and
its tributaries:
   District engineer: Maj. W. H. Lanagan, Corps of Engineers, to
July 13, 1933; Lt. Col. V. L. Peterson, Corps of Engineers, from
that date to February 3, 1934; and Maj. H. H. Stickney, Corps of
Engineers, since that date.
   Division engineer: Lt. Col. Thomas M. Robins, Corps of
Engineers.
                                                IMPROVEMENTS

                                                  Page                                                                          Page
1. San Diego Harbor, Calif_____                   1237         4. San Luis Obispo Harbor,
2. Newport Bay Harbor, Calif__                    1241              Calif                                                       1---------------------250
3. Los Angeles and Long Beach                                  5. Examinations, surveys, and
      Harbors, Calif___                           1244              contingencies (general) __                                  1251                   {
                                                                                                                                                            6, ii
                                 1. SAN DIEGO HARBOR, CALIF.

  Location.-San Diego Harbor is located just north of the United
States-Mexico boundary line, and is about 96 and 506 miles south-
east of Los Angeles Harbor and San Francisco Bay, respectively.
(See U. S. Coast and Geodetic Survey Chart No. 5107.)
1238    REPORT OF CHIEF OF ENGINEERS,         U. S.   ARMY,   1934

   Previous projects.-Adopted by the River and Harbor Acts of
March 3, 1875, September 19, 1890, and June 25, 1910. The costs and
expenditures were $154,703.68 for new work and $59,904.21 for
maintenance, a total of $214,607.89. For further details see page
1976 of Annual Report for 1915.
   Existing project.-This provides for a rubble-mound jetty 7,500
feet long on Zuninga Shoal; for an entrance channel 40 feet deep,
800 feet wide; for a bay channel 35 feet deep, 900 to 2,000 feet wide,
from deep water near Ballast Point to the turning basin opposite the
municipal piers; for a turning basin 35 feet deep opposite the
municipal piers; for a channel to National City and Chula Vista 20
feet deep and 300 feet wide; and for an earthen dike 7,735 feet
long to divert the San Diego River from San Diego Bay to False
Bay. The plane of reference is mean lower low water. The range
between mean lower low water and mean higher high water is 5.6
feet. The extreme range is about 9 feet.
   The estimated cost for new work, revised in 1930, is $2,304,800,
exclusive of amounts expended on previous projects, of which $10,-
000 is to be contributed by local interests. The latest (1930) ap-
proved estimate for annual cost of maintenance is $20,000 for dredg-
ing entrance channel.
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1875, provided for the diversion
dike (Annual Report, 1873, p. 1142); the act of September 19, 1890,
provided for the jetty on Zuninga Shoal (H. Doc. No. 177, 50th
Cong., 1st sess.) ; the act of March 4, 1913, provided for a 35-foot
channel through the outer bar (H. Doc. No. 1309, 62d Cong., 3d
sess.); the act of July 27, 1916, provided for widening the approach
 (area B) to San Diego Municipal Pier No. 2 by dredging area C
 (north of area B) (H. Doc. No. 648, 64th Cong., 1st sess.) ; the act of
August 8, 1917, provided for dredging area A (south of area B)
 (Rivers and Harbors Committee Doc. No. 8, 64th Cong., 2d sess.),
and for dredging the 35-foot channel through the middle ground
 (H. Doc. No. 140, 65th Cong., 1st sess.); the act of September 22,
1922, provided for dredging areas D and E (H. Doc. No. 1000, 66th
Cong., 3d sess.) ; the act of March 3, 1925, provided for widening the
approach (area C) to San Diego Municipal Pier No.. 1 by dredging
a portion of area F (north of area C) (Rivers and Harbors Commit-
tee Doc. No. 2, 68th Cong., 1st sess.) ; and the act of July 3, 1930, pro-
vided for the 40-foot channel through the outer bar, for dredging
along the south and north banks of the main channel; for dredging
the turning basin, for dredging area H, and for dredging channel
to National City and Chula Vista (S. Doc. No. 81, 71st Cong., 2d
sess.). For latest published maps see the last-mentioned document,
and House Document No. 223, Seventy-third Congress, second session.
   Recommended modifications of project.-Under date of January
17, 1934, the Chief of Engineers recommended that the bay channel be
widened to 2,200 feet, with a depth of 35 feet at an estimated cost
of $1,800,000, with $5,000 annually for maintenance in addition to
that now required (H. Doc. No. 223, 73d Cong., 2d sess.).
   Local cooTperation.-The River and Harbor Act of July 3, 1930,
provides that before any work is undertaken on the turning basin
local interests shall furnish necessary disposal areas and give as-
         RIVERS AND HARBORS-LOS               ANGELES,     CALIF.,   DISTRICT     1239
surances satisfactory to the Secretary of War and the Chief of
Engineers that they will deepen the areas adjacent to the municipal
piers and the part of area F covered by the existing project to a
depth of 35 feet, and that before any work is undertaken on the
channel to Chula Vista local interests shall contribute $10,000 in
cash. These conditions have been complied with, except in the case
of the channel to Chula Vista.
   Terninal faoilities.-There are 46 wharves on the water front of
San Diego, 2 at Coronado, and 1 at North Island. The existing
terminal facilities are considered adequate for existing commerce.
 (See Port Series No. 13, pt. 2, revised 1930, Corps of Engineers.)
   Operations and results during fiscal year.-No operations were
conducted with regular funds. The expenditures were $1,644.15,
applied to accounts payable for the preceding fiscal year. The fol-
lowing work was conducted under allotments from the Public Works
Administration: The United States dredge A. Mackenzie widened
the entrance channel from 570 feet to 800 feet for its full length and
to project depth of 40 feet, removing therefrom a total of 1,004,796
cubic yards, place measurement, between October 16, 1933, and Feb-
ruary 17, 1934, thus completing this new work. The cost and
expenditures were $86,352.01.
   Condition at end of fiscal ylear.-The existing project is completed,
except the dredging of the channel to Chula Vista. The dike was
completed in 1876, the Zuninga Jetty in 1904, and the entrance chan-
nel 800 feet wide and 40 feet deep was completed in February 1934.
   At the end of the fiscal year the controlling depths were 38 feet
in the entrance channel, 35 feet in the bay channel, the turning basin
and area H, and 17 feet in the Chula Vista Channel.
   The costs of the existing project were $2,101,909.65 for new work,
and $112,521.05 for maintenance, a total of $2,214,430.70 from regular
funds, and $86,352.01 for new work from Public Works funds. The
total expenditures were $2,300,782.71, including $86,352.01 from Pub-
lic Work funds. In addition, $4,440.59- contributed by the city of
San Diego was expended for dredging in front of the municipal
piers.
   Proposed operations.-No funds are available and no work is con-
templated for the fiscal year 1935.
   The sum of $250,000 can be profitably expended during the fiscal
year 1936 for maintenance as follows:
Repair to Zuninga Shoal Jetty by contract July 1935 to June 1936-- $200, 000
Redredging entrance and bay channels by Government plant and hired
  labor November and December 1935------------------------------     50, 000

        Total-----------------------------------------------------250,;              000
                             Cost and financial summary
                        MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934 -----------------------     $2, 256, 613. 33
Cost of maintenance to June 30, 1934 ------------------------     172, 425.26
      Total cost of permanent work to June 30, 1934----------             2, 429, 038. 59
Net total expenditures---------------------------------                   2, 429, 038. 59
Total amount appropriated to June 30, 1934_____--                     -   2; 429, 038.59
1 In   addition $4.440.59 was expended from contributed funds.
1240            REPORT             OF CHIEF OF ENGINEERS,                               U.    S.       ARMY,       1934


     Fiscal year ending June 30                 1930                 1931                 1932              1933                 1934


Cost of new work-__-------              __     __.        .$260,          293. 42      $136, 476. 65     $156, 394. 68 .....      ____..
Cost of maintenance..........------------        $626. 24    --------------               1, 552. 84       21, 167. 79
         Total cost. ---------------              626. 24        260, 293. 42           138, 029. 49      177, 562. 47
Total expended-----------------                 1, 700. 64        197, 259. 45          199, 956. 56      175, 893. 32          $1, 644.15
Allotted_..-.---..-.-.---._ -                -16, 938. 50        395, 000. 00 ------------                193, 593. 30         -18, 364. 58


Balance unexpended July 1, 1933-------------------------------$20, 008. 73
Deductions on account of revocation of allotment _______-
                                                     - - -___   18, 364. 58

      Net amount to be accounted for-------------                                                                           1, 644. 15
Gross amountkexpended--___$1,                                                                              685. 57
Less reimbursements collected _____________     -
                                               _______                                                      41. 42
                                                                                                                            1, 644. 15

Amount (estimated) required to be appropriated for completion of
existing project---------------------------------------------                                                             20, 000. 00

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance____________________________        _   250, 000. 00
                                                PUBLIC WORKS FUNDS

Cost of new work to June 30, 1934__                                                                                      $86. 352. 01
Cost of maintenance to June 30, 1934

      Total cost                   ,of
                   permanent work to June 30, 1934______________
Net total expenditures
                                                                                                                          86, 352. 01
                                                                                                                          86, 352. 01
Total amount appropriated to June 30, 1934______________________                                                          86, 352. 01

            Fiscal year ending June 30                       1930               1931             1932           1933              1934


Cost of new work.....---------------------          ------------          ------------------------         ------------         $86, 352. 01
Cost of maintenance      ---      ----
Total expended_..----------------         _-
                                      -----------------..                                                                        86, 352. 01
Allotted----...-----------------                              -------------------------------                                    86, 352. 01


Amount allotted from National Industrial Recovery Act approved
    June 16, 1933                                      ----------------                                                  $124, 500. 00
Deductions on account of revocation of allotment________________                                                           38, 147. 99

      Net amount to be accounted for- -                                     ____        __-______-__                       86, 352. 01
Gross amount expended----_------.. -----                                                           $86, 919. 55
Less reimbursements collected______--_---                                       ---                     567. 54
                                                                                                                           86, 352. 01

              CONSOLIDATED COST AND FINANCIAL SUMMARY FOR SAN DIEiGO HARBOR

Cost of new work to June 30, 19341____________________________                                                     $2, 342, 965. 34
Cost of maintenance to June 30, 1934_____________________                                                                 172, 425. 26

      Total cost of permanent work to June 30, 1934___________                                                       2,515, 390. 60
Net total expenditures_______-_-- ____---_--_----_                                                                   2,515, 390. 60
Total amount appropriated to June 30, 1934_______________                                                            2, 515, 390. 60

    1 In addition $4,440.59 was expended from contributed funds.
            RIVERS AND HARBORS-LOS                         ANGELES,           CALIF., DISTRICT                   1241

           Fiscal year ending June 30              1930            1931          1932           1933            1934


Cost of new work_. _____--------_-_---------_
                                        _$260,                     293. 42 $136,476. 65 $156,394. 68          $86, 352. 01
Cost of maintenance.-----------------              $626. 24-      _---------  1, 552. 84  21,167. 79

      Total cost__-----         -----------         626. 24    260, 293. 42   138,029.49     177, 562. 47      86, 352. 01

Total expended.__        ___---------------       1, 700. 64   197, 259. 45   199, 956. 56   175, 893. 32      87, 996. 16
Allotted      ----------------------------       16,938.50     395,000.00 -----------        193, 593.30       67, 987.43


                                           --------------
Balance unexpended July 1, 1933____________----                $20, 008. 73
Amount allotted from National Industrial Recovery Act approved
  June 16, 1933----------- ----------------------------------- 124, 500.00

      Amount to be accounted for____________-________-     -__ -   144. 508. 73
Deductions on account of revocations of allotment----------------- 56, 512. 57

       Net amount to be accounted for-......__-_______--                                                    87, 996. 16
Gross amount expended----------------------------- $88, 605.12
:Less reimbursements collected------------------------   608. 96
                                                                                                            87, 996. 16
Amount (estimated) required to be appropriated for
completion of existing project----------------------------------                                           20, 000. 00

Amount that can be profitably expended in fiscal year
ending June 30, 1936, for maintenance--------------------__-                                          250, 000. 00

                             2. NEWPORT BAY HARBOR, CALIF.

   Location.-This harbor is 24 miles southeast of Los Angeles-
Long Beach Harbor, and 72 mi!es northwest of San Diego Harbor.
 (See U. S. Coast and Geodetic Survey Chart No. 5108.)
   Emisting project.-No work has been authorized by Congress.
The construction of entrance jetties, 900 feet apart, 2,860 feet and
1,620 feet in length, respectively; and dredging an entrance channel
20 feet deep by 500 feet wide, main inner channels to 20-foot depth
and suitable width, a yacht anchorage basin to 15-foot depth, and the
remainder of the bay to a 10-foot depth, all at an estimated cost of
$1,835,400 for new work, of which amount local interests are required
to contribute not to exceed $918,000; all as recommended by the
Chief of Engineers to the Secretary of War under date of September
25, 1933, was authorized by the Federal Emergency Administration
of Public Works.
   The plane of reference is mean lower low water. The range
between mean lower low water and mean higher high water is 5.1
feet. The extreme range is about 9 feet.
   Local cooperation.-The existing project requires that local inter-
ests contribute not to exceed $918,000, or half the cost of new work,
and furnish the necessary land, rights-of-way, and disposal areas.
'These conditions have been complied with, except transfer to the
Government of land at the roots of the jetties which is now in
progress. Temporary permits covering facilities necessary for con-
struction have been given.
   In addition thereto the city of Newport Beach and Orange County
have expended for dredging and jetty work the sum of $1,670,802
since 1916.
   Terminal facilities.-There are numerous small wharves and land-
ings, practically all for yachts.
1242     REPORT OF CHIEF OF ENGINEERS,               Ui.   S.   ARMY,   1934

   Operation and results during fiscal year.-No operations were
conducted with regular funds. The following work was conducted
under authority of the Federal Emergency Administration of Public
Works. Surveys were largely completed; bids for the jetty work
were opened May 28, 1934; and specifications for dredging were
partly prepared.
   The cost of new work was $448.73, and of maintenance $2,954.12,
a total of $3,402.85, all from Public Works funds. There were no
expenditures.
   Condition at end of fiscal year.-Considerable work has been done
by the city of Newport Beach. The west jetty was constructed in
1916, repaired and extended in 1927, and groins constructed in 1929.
The east jetty, constructed of concrete in 1927, has had only minor
repairs and is in good condition. The city of Newport Beach has
spent $1,065,000 on jetty and dredging work, and Orange County
has spent $605,802 for rights-of-way, etc., dredging, and jetty work.
Private interests have spent $611,000 for dredging, etc., making the
total expenditures for harbor improvements by local interests
$2,281,802.
   The placing of about 330,000 tons of stone for the jetty work, and
the dredging of about 8,500,000 cubic yards of material will be re-
quired to complete the work authorized by the Federal Emergency
Administration of Public Works.
   Dredging by the city of Newport Beach has resulted in the fol-
lowing controlling channel dimensions as of January 1, 1934:
Entrance channel 15 feet deep and 300 feet wide; main bay channel
16 feet deep and 100 feet wide; turning basin 600 feet by 700 feet,
17 feet deep; and zero in the anchorage area.
   The cost of the Public Works Administration project was $448.73
for new work and $2,954.12 for maintenance, a total of $3,402.85, all
from Public Works funds. There were no expenditures.
   Proposed operations.-An allotment of $918,000 made from Na-
tional Industrial Recovery Act funds during July 1934 and con-
tributed funds amounting to $918,000, a total of $1,836,000, will be
applied to new work as follows:
Repairing and extending jetties by contract August 1934 to June
  1935-----------          ---------------------------------                   $636, 000i
Dredging the bay and entrance channels by contract, January 1935
  to January 1936                  -      --------------
                                                ,-                         1, 200, 000

       Total                                                                  836, 000
                                                                           1----------------------------
  No additional funds are required for the fiscal year 1936 and
no work is contemplated.
                           Cost and flnancial summary
                              PUBLIC   WORKS   FUNDS

Cost of new work to June 30, 1934__
                                 ------------------------------                 $448. 73
Cost of maintenance to June 30, 1934----------------------------               2, 954. 12
     Total cost of permanent work to June 30, 1934--------------               3, 402. 85
Minus accounts payable June 30, 1934----------------------------               3, 402. 85
Net total expenditures_
Unexpended balance June 30, 1934         -----------------                918, 000. 00
       Total amount appropriated to June 30, 1934 -----.----              918, 000. 00
           RIVERS AND HARBORS-LOS ANGELES, CALIF., DISTRICT                                                      1243

         Fiscal year ending June 30                  1930          1931        1932             1933             1934


Cost of new work------
                ...-------                  ------------------------------------------------                      $448. 73
  ost of maintenance-----------------------------------------------.....-----------.............                 2, 954. 12
      Total cost-----------              ---------------------------------------------                           3, 402. 85
Total expended      _-....----                                      ..... .........              .----
Allotted --------------------------------..------------                                                        918, 000. 00
                                                                               ......---------.....-----------------------


Amount allotted from National Industrial Recovery Act approved
June 16, 1933 ----    ------------------------------------ $918, 000. 00
Balance unexpended June 30, 1934__            -----------                   9________----
                                                                                 000. 00                918,
Outstanding liabilities June 30, 1934___________---------------------------   3, 402. 85
         Balance available June 30, 1934_________________--___-                                          914, 597. 15

                                            CONTRIBUTED FUNDS

Cost of new work to June 30, 1934________________                                      ----
Cost of maintenance to June 30, 1934__________________________                                          --
      Total cost of permanent work to June 30, 1934
Net total expenditures
                                                    __                                                  -----------
Unexpended balance June 30, 1934______________________-_____                                                 $918, 000

         Total amount contributed to June 30, 1934__________________                                           918, 000

         Fiscal year ending June 30                  1930          1931        1932              1933            1934


C ost of new work -...      -                       ......... .. ...... ..... ... ....
Cost of maintenance__            _______
Total expended..-
Contributed.......-----------------------------------------------------------                                $918, 000.00


Amount contributed by Orange County, Calif                                                             $918, 000. 00
Balance unexpended June 30, 1934_____  ____--                                    -
                                                                             ____---           -__-_     918, 000. 00

CONSOLIDATED        COST AND FINANCIAL              SUMMARY        FOR NEWPORT BAY               HARBOR,        CALIF.

Cost of new work to June 30, 1934-----------------------------                                                $448. 73
Cost of maintenance to June 30, 1934_--------------------                                                    2,954. 12

       Total cost of permanent work to June 30, 1934                         ------------                    3, 402. 85
Minus accounts payable June 30, 1934_-__    ___     ____---------3,                                            402. 85

Net total expenditures---------------------------------------- --
Unexpended balance June 30, 1934__ _____________--------1, 836, 000. 00

Total amount appropriated and contributed to June 30, 1934-__.                                        1,836, 000. 00

         Fiscal year ending June 30                  1930          1931         1932             1933            1934


Cost of new work--------------------------------           -----                                                 $448. 73
Cost of maintenance-----------        __-------------------
                                    ----                          -----------                 -----------        2,954.12
       Total cost----...__------------------......            ._                          _             _.       3, 402. 85

Total expended                                  ,_-----:---_------------------------_
Allotted and contributed--- _---------            ----      --------------   ----------------                1, 836, 000. 00
1244     REPORT OF CHIEF OF ENGINEERS,          U. S. ARMY, 1934

Contributed by Orange County, Calif---------------------------    $918, 000. 00
Amount allotted from National Industrial Recovery Act approved
June 16, 1933----------------------------------------------       918, 000. 00

       Amount to be accounted for__--------------------------1, 836, 000. 00

Balance unexpended June 30, 1934_---------------------------1, 836, 000.00
Outstanding liabilities June 30, 1934--------------------------- 3, 402, 85

       Balance available June 30, 1934------------------------   1,832, 597. 15

         3. LOS ANGELES AND LONG BEACH HARBORS, CALIF.

   Location.-These harbors are 410 miles southeast of San Francisco
Harbor and 96 miles northwest of San Diego Harbor. (See U. S.
Coast and Geodetic Survey Chart No. 5146.)
   Previous projects-Los Angeles Harbor.-There was no project
for the outer harbor prior to the existing project. Original project
for the inner harbor was adopted by the River and Harbor Act of
March 3, 1871, and modified by the River and Harbor Acts of March
3, 1881, June 3, 1896, June 13, 1902, June 25, 1910, and July 18, 1918.
The cost of previous projects was $2,187,046.59 for new work and
$139,347.45 for maintenance, a total of $2,326,394.04, which was the
total amount expended.
   Long Beach Harbor.-There was no previous project.
   For further details see page 1977 of Annual Report for 1915.
   Existing project.-This provides for a breakwater 11,152 feet long
extending easterly from Point Fermin and a detached breakwater
12,500 feet long in prolongation easterly thereof; for an entrance
channel 35 feet deep and 1,000 feet wide with a turning basin at Los
Angeles 35 feet deep; for a channel 35 feet deep and 650 feet wide in
the east basin from the turning basin to United States station 406;
for dredging to a depth of 35 feet and 400 feet wide in Cerritos
Channel from United States station 406 to the Long Beach turning
basin; for a turning basin 35 feet deep at Long Beach; for an en-
trance channel to Long Beach Harbor 35 feet deep and 300 to 500
feet wide; for maintenance of the Long Beach Breakwater south of
the outer end of Pier A; for dredging to a depth of 35 feet an area
2,300 feet long, with an average width of about 1,200 feet in the
outer harbor on the west side of the entrance to Los Angeles inner
harbor; for dredging to a depth of 35 feet the area east of the Los
Angeles entrance channel and southwest of a line running S. 60 ° E.
from the southwest corner of Reservation Point; and for the con-
struction of silt-diversion works for tHe protection of Los Angeles
and Long Beach Harbors.
   The plane of reference is mean lower low water. The range of
tide between mean lower low water and mean higher high water is
5.5 feet. The extreme range is about 9 feet.
   The estimate of cost for new work, revised in 1931, is $17,500,000,
exclusive of amounts expended on previous projects. The latest
(1930) approved estimates for annual cost of maintenance are
$125,000 for dredging and $50,000 for repairs to the breakwater.
   The existing project was authorized by the following river and
harbor acts: The act of July 25, 1912, provided for dredging in Los
      RIVERS AND    HARBORS-LOS     ANGELES,   CALIF., DISTRICT   1245

Angeles outer harbor west of the entrance channel (Rivers and Har-
bors Committee Doc. No. 8, 62d Cong., 2d sess.); the act of August
8, 1917, provided for the silt-diversion works (Rivers and Harbors
Committee Doc. No. 9, 64th Cong., 2d sess.); the act of September
22, 1922, provided for a triangular area of approach to Los Angeles,
inner harbor entrance channel (H. Doc. No. 1013, 66th Cong., 3d
sess.) ; the act of March 3, 1925, provided for dredging the main-
entrance channel to a depth of 35 feet and width of 1,000 feet, in.
cluding the reclamation of Reservation Point (H. Doc. No. 349, 68th
Cong., 1st sess.); the act of July 3, 1930, provides for a detached
breakwater 12,500 feet long (Rivers and Harbors Committee Doc,.
No. 33, 71st Cong., 2d sess.) in prolongation of the existing break-
water (authorized by the act of June 3, 1896); for widening the.
fairway on the easterly side of the entrance to Los Angeles inner
harbor; for dredging a channel 35 feet deep and 650 feet wide in,
the east basin from the turning basin to United States station 406;
for dredging to depth of 35 feet and 400 feet wide in Cerritos Chan-
nel from United States station 406 to the Long Beach turning basin;:
for a turning basin 35 feet deep at Long Beach; for the entrance
channel of Long Beach Harbor, 35 feet deep and 500 feet wide;
and for maintenance of the Long Beach Breakwater south of the
outer end of Pier A (S. Doc. No. 130, 71st Cong., 2d sess.). For
latest published maps see House Document No. 349, Sixty-eighth
Congress, first session, and Senate Document No. 130, Seventy-first.
Congress, second session. The River and Harbor Act approved July
3, 1930, provides that in no case shall dredging be done within 50
feet of established pierhead lines, or existing piers and wharves.
    Local cooperation.-Fully complied with.
    Terminal facilities.-In Los Angeles Harbor there is a total of
66,002 linear feet of wharves. In Long Beach Harbor there is a total
of 7,355 linear feet of wharves. The existing terminal facilities are
considered adequate for present commerce. (See Port Series No. 13,
Corps of Engineers, pt. 1.)
    Operationsand results during fiscal year--New u'ork..-Operations
conducted with regular funds consisted of work on the composite
type detached breakwater, first section, 1,400 feet in length, was
continued under existing contract throughout the year and the sec-
tion completed, except for the placing of about 1,289 tons of super-
structure stone. The sand and clay core of this section was com-
pletedilthe previous fiscal year and during this ficald year 87,247 cubic
yards of substructure stone at a cost rof $197,80628, and 115,342 tons;
of superstructure stone at a cost of $256,301.21, were placed in the,
breakwater all for new work. This work has completed the core,
the full length or 1,400 feet of substructure, and 1,368 linear feet
of the superstructure.
    Operations conducted on the existing project under allotments,
from the Federal Emergency Administration of Public Works con-
sisted of new work under contract on the second section, 4,000 feet in
length, commenced November 29, 1933, and continued the balance.
of the fiscal year. This work involved the dredging from the en-
trance channel and the depositing of 475,500 cubic yards of core
material at a cost of $303,953.60, the placing of 125,057 solid cubic
yards of substructure at a cost of $291,746.83, and 1,749 tons of
superstructure stone at a cost of $3,835.73, all for new work. This
1246     REPORT   OF CHIEF OF ENGINEERS, U.         S. ARMY,   1934

work has completed 3,768 feet of the core of the 4,000-foot section
of the breakwater, 1,564 linear feet of the substructure, and 24 linear
feet of the superstructure or 37.1 percent of the cost of the section.
The sum of $392.83 was expended from regular funds by hired labor
for new work in determining, by use of Goldbeck cells, the pressures
of the breakwater rockments on the sand-clay core.
   The following operations, accomplished with regular funds, were
all for maintenance: Replacing by hired plant dislodged stones in
San Pedro breakwater, $72.25; dredging an irregularly shaped area
immediately west of the entrance channel to Los Angeles Harbor to
36 feet by contract, involving 173,467 cubic yards of material and
costing $56,238.22; dredging by hired plant within the same area
small nodules of hard material at a cost of $2,326.58; dredging 19,000
cubic yards of material from shoals in the Long Beach entrance
channel at a cost of $5,538.80; placing by contract on the east and
south revetments around Reservation Point, Los Angeles Outer
Harbor 4,110 tons of stone for repairs at a cost of $13,442.29.
   The costs of all operations on the existing project were distributed
as follows:
Regular funds:
    New York__-                                               $454, 500. 32
    Maintenance----------------------------------------------77, 618. 14
Public Works funds : New work                                  599, 536. 16

       Total cost, all funds----------------------------------1, 131, 654. 62
   The expenditures were $535,508.52 from regular funds and $543,-
023.71 from Public Works funds, a total of $1,078,532.23.
   Condition at end of fiscal year.-The existing project is 75.3 per-
cent completed. The San Pedro Breakwater was completed in 1912,
and the silt diverision works in 1923. The dredging of the entrance
channel to full project width, most of the material of which is being
used for the core of the detached breakwater, is about 43 percent
completed. All other authorized dredging is completed. The 1,400-
foot or first section of the detached breakwater at its easterly end
was 99.4 percent completed.
   The sand and clay core of the adjoining 4,000-foot section of this
breakwater is 94.2 percent completed; 39.1 percent of its substructure
enrockment; and 0.6 percent of its superstructure also were com-
pleted. The San Pedro Breakwater is in perfect repair and the Long
Beach Breakwater is in reasonably good condition. The entrance
channel to Long Beach has shoaled in spots.
   On June 30, 1934, the controlling depths in the two harbors were:
   Los Angeles Harbor.-Thirty-five feet in the entrance channel and
turning basin and 35 feet in the east basin channel and Cerritos
Channel.
   Long Beach Harbor.-Thirty-five feet in Cerritos Channel and en-
trance channel and 38 feet in turning basin.
   The work remaining to be done is to complete the 12,500-foot
detached breakwater, and to widen the fairway at the entrance to
Los Angeles Inner Harbor.
   The total cost of the existing project to end of fiscal year, including
Public Works funds, was $10,943,749.98 for new work and $531,521.43
for maintenance, a total of $11,614,618.86. The total expenditure was
$11,395,895.i5.
           RIVERS AND HARBORS-LOS                                        ANGELES, CALIF., DISTRICT                         1247
  The cost of the work paid for by allotments from the Federal
Emergency Administration of Public Works was $599,536.16 and the
expenditures were $543,023.71, all for new work.
  Proposed operations.-The balance unexpended from National
Industrial Recovery Act funds on July 1, 1934, will be applied as
follows:
Accounts payable June 30, 1934_.                  .. _______    $56, 961. 18
New work: Completion of 4,000 feet of detached breakwater
under existing contract-------------------------------      1, 050, 015. 11
     Total     ------------------------------------------    1,106, 976.29
  The balance unexpended from regular appropriations on July 1,
1934, will be applied as follows:
Accounts payable June 30, 1934____________--------------        $23, 889.29
New work: Completion of 1,400 feet of detached breakwater under
existing contract___------------------------------              10, 471. 50

          Total -------                           ------------------------------------                                 34, 360. 79
  The additional sum of $1,387,000 can be profitably expended dur-
ing the fiscal year 1936 as follows:
New work: Construction of an additional length of breakwater
about 3,100 feet long under contract, July 1935 to June 1936.... $1, 350, 000
Maintenance: Redredging entrance channel to Long Beach Harbor
  by United States hopper dredge, January and February 1936,
  about 11/2 months---   ---------- ---------       ----       ----    37, 000

          Total for all work___________________-------------------------                                               1, 387, 000
   The completion of the work will finish the detached breakwater
to a length of about 8,500 feet, and will restore project depth in the
entrance channel to Long Beach Harbor.
                                                  Cost and financial summary
                                      MAINTENANCEI               AND IMPROVEMENT              FUNDS

Cost of new work to June 30, 1934_ .. __-__                                                  -                $12, 531,260. 41
Cost of maintenance to June 30, 1934____________----------                                                         670, 868. 88
      Total cost of permanent work to June 30, 1934---____                                                       13, 202, 129. 29
Value of plant, materials, etc., on hand June 30, 1934_.......                                                            976. 86

      Net total cost to June 30, 1934_ _______      __-----                                                      13, 203, 106.15
Plus accounts receivable June 30, 1934 ---   ------------                                                                  48. 62

     Gross total costs to June 30, 1934_-__-------------- 13,203,154. 77
Minus accounts payable June 30, 1934- -------------------     23, 889. 29

     Net total expenditures_---------- -----------        13, 179, 265.48
Unexpended balance June 30, 1934-------------------------      34, 360.79

           Total amount appropriated to June 30, 1934 ______                                           -__       13, 213, 626.27

   Fiscal year ending June 30                             1930            1931            1932            1933             1934


Cost of new work...-----------..........               $131, 866. 23   $486, 132. 52   $200, 056. 88   $209,903. 18      $454, 500. 32
Cost of maintenance ------------                             763. 67    194, 689. 68         410. 00      3, 153. 61       77, 618. 14
       Total cost---...............------------         132, 629.90     680, 822. 20    200, 466. 88    213, 056. 79      532, 118. 46
Total expended--.....------------                       103, 317. 31    606, 075. 95    284,162. 01     198, 966. 63      535, 508. 52
Allotted ---------------------                          195, 000. 00    656, 500. 00     i5, 000. 00    644, 300. 64       91, 197. 90

          91536--ENG 1934                         79
1248        REPORT OF CHIEF OF ENGINEERS,                                 U. S. ARMY,          1934

Balance unexpended July 1, 1933                         _----------__                           $478, 671. 41
Amount allotted from War Department Appropriation
                            --------
Act approved July 14, 1932___________            $38, 000. 00
Amount allotted from Emergency Relief and Con-
struction Act approved July 21, 1932------ ---    54, 000. 00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933_ ___                     3, 200. 00
                                                                                                   95, 200,. 00

     Amount to be accounted for ______________________---_                                        573, 871. 41
Deductions on account of-
   Revocation of allotment___
                          ------------------------  $1, 148. 21
   Revocation of impounded funds ------------------  2, 853. 89
                                                                                                      4, 002. 10

      Net amount to be accounted for____________________--__-                                     569, 869. 31
Gross amount expended_________________              $562, 503. 75
Less reimbursements collected_________-_______-       26, 995. 23
                                                                                                  535, 508. 52

     Balance unexpended June 30, 1934_______________------                                         34, 360. 79
Amount covered by uncompleted contracts------------------__                                        29, 621. 75

     Balance available June 30, 1934_______                                                           4. 739. 04
Accounts receivable June 30, 1934_______________--____--------                                            48. 62

         Unobligated balance available June 30, 1934---                           ________            4, 787. 66

Amount (estimated) required        to, be appropriated for completion
                                     - --- --- -- --- -- --- --- -- --- -- --- -
of existing project - - - - - - - -                                             5, 400, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1936 :
   For new work - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1, 350, 000. 00
   For maintenance                                                                                   7, 500. 00
                                                                                                    3___________________

         Total 1-----------------                                                               1, 387, 500. 00

                                             PUBLIC       WORKS FUNDS


Cost of new work to June 30, 1934____________________________                                    $599, 536. 16
Cost of maintenance to June 30, 1934___

      Total cost of permanent work to June 30, 1934                                    -___       599, 536. 16
Value of plant, materials, etc., on hand June 30, 1934-                           --     -             448. 73
     Net total cost to June 30, 1934___________________________                                   599, 984. 89
Minus accounts payable June 30, 1934-------------------                                            56, 961. 18
     Net total expenditures____________________________        543, 023. 71
Unexpended balance June 30, 1934 ___________________________ 1.106, 976. 29
         Total amount appropriated to June 30, 1934______________                               1, 650, 000. 00


   Fiscal year ending June 30                1930              1931        1932         1933             1934


Cost of new work------------------
                                ,                   -------------------
                                                    ---                                                $599, 536. 16
Cost of maintenance             ---- -----     --------             - -- -------- -------           - 59 ---
Total expended-----------------------                           --------------     -------------        543, 023. 71
Allotted -----------------............--............-------------
                                                            .-------------         ----------         1,650, 000. 00
   1Exclusive of available funds.
            RIVERS AND HARBORS-LOS ANGELES, CALIF., DISTRICT                                                             1249
Amount allotted from National Industrial Recovery Act ap-
                       ---------
  proved June 16, 1933______________________                  $1, 650, 000. 00
Gross amount expended-------------------------  $543, 862. 04
Less reimbursements collected_____                    838. 33
                                                                  543, 023. 71

     Balance unexpended June 30, 1934______________-------                                                     1, 106, 976. 29
Amount covered by uncompleted contracts------------------                                                      1,040, 725. 65

           Balance available June 30, 1934------------------------                                                  66, 250. 64

CONSOLIDATED             COST AND FINANCIAL                  SUMMARY FOR LOS ANGELES AND LONG BEACH
                                                             HARBORS

Cost of new work to June 30, 1934_                                                                         $13, 130, 796. 57
Cost of maintenance to June 30, 1934                                                                             70, 868. 88
                                                                                                                6____________________
      Total cost of permanent work to June 30, 1934----------                                                 13, 801, 665. 45
Value of plant, materials, etc., on hand June 30, 1934----------                                                    1, 425. 59

      Net total cost to June 30, 1934________________________                                                 13, 803, 091. 04
Plus accounts receivable June 30, 1934 _______------   ___- __                                                          48. 62

     Gross total costs to June 30, 1934------------------- 13, 803, 139. 66
Minus accounts payable June 30, 1934-----------------------     80, 850. 47

     Net total expenditures______________________________                                                     13, 722', 289. 19
Unexpended balance June 30, 1934________________________                                                       1, 141, 337. 08
           Total amount appropriated to June 30, 1934_________                                                14, 863, 626. 27

    Fiscal year ending June 30                  1930              1931            1932                 1933             1934


Cost of new work ..     ....-------------..$131, 866. 23       $486, 132. 52   $200, 056. 88     $209, 903. 18      $1, 054, 036. 48
Cost of maintenance -------------                763. 67        194, 689. 68         410. 00        3, 153. 61           77, 618. 14
        Total cost..........------------      132, 629. 90      680, 822. 20    200,;466. 88         213, 056. 79    1,131, 654. 62
Total expended--.......----------..           103, 317. 31      606, 075. 95    284, 162. 01         198, 966. 63    1,078, 532. 23
Allotted...................----------------   195, 000. 00      656, 500. 00     15, 000. 00         644, 300. 64    1, 741, 197. 90


Balance unexpended July 1, 1933------__   ____-.  _______-        -                                             $478, 671. 41
Amount allotted from War Department Appropria-
  tion Act approved July 14, 1932 -____---____  -      $38, 000. 00
Amount allotted from Emergency Relief and Con-
  struction Act approved July 21, 1932------------      54, 000. 00
Amount allotted from War Department Appropria-
  tion Act approved Mar. 4, 1933 --- __---_____     -    3, 200. 00
Amount allotted from National Industrial Re-
  covery Act approved June 16, 1933---              1, 650,000.00
                                                                                                               1, 745, 200. 00

      Amount to be accounted for_ ..
Deductions on account of-
                                     __-__-________           2, 223, 871. 41                        ___
   Revocation of allotment---------------------   $1, 148. 21
   Revocation of impounded funds .------- --    -  2, 853. 89         __
                                                                   4, 002.10
      Net amount to be accounted for       ___----------------- 2, 219, 869. 31-
Gross amount expended __       _____  _____-__ -  $1, 106, 365. 79
Less reimbursements collected __- ____-_______         27, 833. 56
                                                                   1, 078, 532. 23'
           Balance unexpended June 30, 1934-..........                                         ---             1, 141,337. 08
1250       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

                                                                                              $1070, 347. 40
Amount covered by uncompleted contracts ------------------ $,
        Balance available June 30, 1934------------------------
Accounts receivable June 30, 1934-----------------------------
                                                                                                   70, 989.
                                                                                                       48. 62
                                                                                                              08
        Unobligated balance available June 30, 1934--------------                                 71, 038. 30
Amount (estimated) required to be appropriated for completion
  of existing project 1 ----                                     --------                      5, 400, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1936:
   For new work     ------------------------------------- 1, 350, 000. 00
   For maintenance 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 37, 500. 00
                      -- - -- - -- - -- - -- -- - -- - -- - - -- - -- -- - -- - -- - -- - -
        Total                                                                                  1, 387, 500. 00
                       4. SAN LUIS OBISPO HARBOR, CALIF.

   Location.-This harbor is 9 miles south of the city of San Luis
Obispo, 190 miles northwest of Los Angeles Harbor, and 220 miles
southeast of San Francisco Harbor. (See U. S. Coast and Geodetic
Survey Chart No. 5386.)
   Existing project.-This provides for the construction on Whaler
Reef of a rubble-mound breakwater 6 feet above mean high water
with a top width of 20 feet, extending from Point San Luis to Whaler
Island, a distance of 336 feet, and southeasterly from the island a
distance of 1,820 feet, giving a total distance, including the island,
of 2,401 feet. The range of tide between mean lower low water and
mean higher high water is 5.3 feet.      The extreme range is about 9
feet. The estimate of cost for new work, revised in 1893, was $568,660.
The latest (1928) approved estimate for annual cost of maintenance
is $1,500.
   The existing project was adopted by the River and Harbor Act of
August 11, 1888 (S. Doc. 81, 49th Cong., 2d sess.). Enlarged
dimensions were authorized under date of January 17, 1893 (Annual
Report for 1893, p. 3226). In 1898 the line of the breakwater was
deflected about 11 ° toward the harbor (Annual Report for 1898,
p. 2933).
   Terminal facilities.-There are three wharves, with total berthing
frontage of 2,734 feet, which are considered to be adequate for pres-
ent needs. (See Port Series No. 13, pt. 2, revised 1930, Corps of
Engineers.)
   Operations and results during fiscal year.--Work preparatory to
repairing the damaged portions of the breakwater by contract was
done, but no funds were expended.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1913. The results have been to give increased security to
vessels anchored at the wharves. The minimum usable depths in the
protected areas are practically stable and vary from 20 to 33 feet
at mean lower low water.
  The storms of the past two winters have damaged the breakwater
principally on the harbor side between 300 and 700 feet seaward of
Whaler Island and about 100 feet shoreward from the seaward end.
About 5,500 tons of concrete or large stone will be required to repair
the damage.
  1Exclusive of available funds.
          RIVERS AND HARBORS-LOS ANGELES, CALIF., DISTRICT                                                              1251
    The total cost of the existing project was $568,417.13 for new work
and $19,715.08 for maintenance, a total of $588,132.21.                                                    The expendi-
tures were $588,132.21.
  Proposed operations.-No funds are available and no operations
are contemplated during the fiscal year 1935.
  The sum of $50,000 can be profitably expended during the fiscal
year 1936 for repair of the breakwater by contract, July and August
1935.
                                                    Cost and financial summary

Cost of new work to June 30, 1934- __-    .__._______________                                                  $568, 417. 13
Cost of maintenance to June 30, 1934 --------   __--__ ___-.__                                                   19, 715. 08

      Total cost of permanent work to June 30, 1934----------- 588, 132. 21
Net total expenditures------------------------------------588, 132. 21
Total amount appropriated to June 30, 1934                                                     ____-----           588, 132.21

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance-------      --     ------------------ 50, 000. 00
   5. EXAMINATIONS,                                 SURVEYS, AND CONTINGENCIES                             (GENERAL)

   The cost of work during the year amounted to $9,982.07; the ex-
penditures were $9,978.64. The unexpended balance on June 30,
1934, of $21,449.52 will be applied as needed during the fiscal year
1935 to payment of expenses incurred in connection with the above
items.
   For the fiscal year ending June 30, 1936, an additional allotment
of $20,000 can be profitably expended.
                                                    Cost and financial summary

Cost of maintenance to June 30, 1934 ______________------$56, 053.                                                            54
Minus accounts payable June 30, 1934 ----------------------------       3.                                                    43
      Net total expenditures___ -------------------------         56, 050.                                                    11
Unexpended balance June 30, 1934----   -------------------        21, 449.                                                    52
      Total amount appropriated to June 30, 1934           .      77, 490.           -----                                    63

    Fiscal year ending June 30                          1930          1931            1932            1933             1934


C ost of new work .--       -   -   --   -   ----      -------------......
                                                             ........................ .......--
                                                                                              ...    . . .. . . .. . . .. . .
Cost of maintenance------------                       $15, 390. 91   $7, 968. 38   $12, 640. 71      $8, 871. 47       $9, 982. 07
Total expended. --...-------------...                  15, 499. 08    7, 749. 56    12, 775. 80       8, 871. 47        9, 978. 64

Allotted.. ----------------------                      18, 700. 00   16, 000. 00 -----------         20, 704. 96       19, 594. 67


Balance unexpended July 1, 1933---     ------------------------ $11, 833. 49
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934--------------------- $19, 000. 00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933-------------------------              906. 51
                                                                           19, 906. 51
      Amount to be accounted for_----------__                      --
                                                                ___-_      31, 740. 00
Deductions on account of revocation of impounded balances                      311. 84            --------
      Net amount to be accounted for-----------------------              - 31, 428. 16
Gross amount expended---                                    $12, 666. 50
Less reimbursements collected -----------                                                          2, 687. 86
                                                            9, 978. 64
           Balance unexpended June 30, 1934-------___-___ _21, 449. 52
1252        REPORT OF CHIEF OF ENGINEERS,                             U. S. ARMY,           1934

Outstanding liabilities June 30, 1934--------------------    $82. 90
Amount covered by uncompleted contracts                    , 595. 43
                                                          1------------
                                                                                                    $1, 678. 33
         Balance available June 30, 1934--------------------------                                   19, 771. 19
Amount that can be profitably expended in fiscal year ending June
30, 1936 for maintenance 1-------------------------------------__                                   20, 000. 00
Status    of reports called for by river and harbor acts and committee resolutions

         Locality             Authorization       Transmitted             Document number          Recommenda-
                                                  to Congress                                          tion
                                                I--        ---    I                           I-
Alamitos Bay, Calif .. __River and Harbor Act
                          July 3, 1930.
Hueneme Harbor, Calif_ River and Harbor Act
                          Jan. 21, 1927.
Los Angeles and Long Senate Committee res- Aug. 18,1934           ------------------------         Favorable.
  Beach Harbors, Calif.   olution Apr. 8, 1932.
Los Angeles Harbor, River and Harbor Act         Nov. 14, 1933    ------------------------         Unfavorable.
  Calif.                  July 3, 1930.                           I
Morro Bay, Calif .-_- -  Senate Committee res- ................   ------------------------
                          olution Oct. 10,1929.                   I
Newport Bay, Calif ....  River and Harbor Act    Nov. 14, 1933        -                                Do.
                           Sept. 22, 1922.
San Diego Harbor, Calif_ River and Harbor Act    Jan. 18, 1934        H. 223, 73d Cong., 2d        Favorable.
                          July 3, 1930.                                 sess.
   Do__-                 Senate Committee res-
                          olution May 17, 1934.
Santa Barbara Harbor, Senate Committee res-
  Calif.                  olution Oct. 26, 1933.
Santa Monica Harbor, Senate Committee res-
  Calif. "                olution June 14, 1934.
Ventura Harbor, Calif___ Senate Committee res-
                          olution Feb. 1, 1934.


IMPROVEMENT OF RIVERS AND HARBORS IN THE SAN
                FRANCISCO, CALIF., DISTRICT
   This district comprises all the waterways and their tributaries
along the Pacific coast from Cape San Martin, Calif. (about 150
miles south of the entrance to San Francisco Bay), on the south to
the Oregon State line on the north, except the waters of Suisun Bay
and the Sacramento and San Joaquin Rivers and their tributaries.
   District engineer: Lt. Col. H. A. Finch, Corps of Engineers.
   Division engineer: Lt. Col. Thomas M. Robins, Corps of Engi-
neers.
                                           IMPROVEMENTS
                                 Page                                                                        Page
1. San Franciscd Harbor, Calif_ 1252                  7. Humboldt Harbor and Bay,
2. Oakland Harbor, Calif______ 1257                       Calif-                                             1271
3. Richmond Harbor, Calif __     1261                 8. Examinations, surveys, and
4. San Pablo Bay and Mare                                  contingencies (general) __                        1273
     Island Strait, Calif_______ 1264                 9. Other projects for which no
5. Monterey Harbor, Calif __     1267                     estimates are submitted ___                        1274
6. Noyo River, Calif____    ____ 1269
                            1. SAN FRANCISCO HARBOR, CALIF.
  Location.-The works included under this project are in San
Francisco Bay, in the vicinity of San Francisco, and in the approach
channels to the Golden Gate, the bay entrance. (See U. S. Coast and
Geodetic Survey Chart No. 5532.)
  Previous projects.-Adopted by the River and Harbor Acts of July
25, 1868, June 10, 1872, June 23, 1874, March 3, 1899, June 13, 1902,
June 25, 1910, and September 22, 1922. The total cost was $1,505,-
     1 Exclusive of available funds.
     RIVERS AND   HARBORS-SAN     FRANCISCO,   CALIF., DISTRICT   1253
719.94 of which $1,030,398.99 was for new work and $475,320.95 for
maintenance. The total expenditures were $2,631,562.34. For fur-
ther details see page 1978 of Annual Report for 1915, page 1749 of
Annual Report for 1921, and page 1633 of Annual Report for 1929.
   Existing project.-This provides for dredging a channel through
the San Francisco Bar on the line of the main ship channel, 45 feet
deep and 2,000 feet wide; the removal of Presidio Shoal, Rincon
Reef Rock (inner), Rincon Reef Rock (outer), Blossom Rock, and
Alcatraz Shoal westward of a north-and-south line 2,000 feet west
of Alcatraz Light to a depth of 40 feet; the removal of Arch Rock,
Shag Rocks Nos. 1 and 2, Harding Rock, Raccoon Shoal, and Point
Knox Shoal westward of a north-and-south line through Point
Stuart Light to a depth of 35 feet; and the removal of a portion of
the shoal channelward of the pierhead line near the mouth of Islais
Creek to a depth of 34 feet, including the approach channel E shown
on map printed in House Document No. 337, Sixty-ninth Congress,
first session, and the area adjacent to and immediately south of it.
All depths refer to mean lower low water. The tidal range between
mean lower low water and mean higher high water is 5.7 feet, with
an extreme range of 10.2 feet.
   The estimate of cost for new work made in 1930 is $1,418,600,
exclusive of amounts expended on previous projects. The latest
 (1930) approved estimate for annual cost of maintenance is
$225,000.
   The existing project was adopted by the following river and
harbor acts: The act of January 21, 1927, providing for the dredg-
ing at Islais Creek (H. Doc. No. 337, 69th Cong., 1st sess.), and the
act of July 3, 1930, provided for the remainder of the project (H.
Doc. No. 196, 70th Cong., 1st sess.). The latest published map is in
Rivers and Harbors Committee Document No. 50, Seventy-second
Congress, second session.
   Supplementing the work authorized by Congress, the deepening
of the bar channel to a depth of 50 feet and the removal of Black
Point Shoal to 40 feet, as recommended by the Chief of Engineers
in Rivers and Harbors Committee Document No. 50, Seventy-second
Congress, second session, has been included in the Public-Works
program under the National Industrial Recovery Act.
   Recommnended mnodifications of project.-Under date of October
31, 1932, the Chief of Engineers recommended modifications of the
existing project so as to provide for a depth of 50 feet for the main
ship channel over the bar; for the removal of Black Point Shoal to
a depth of 40 feet; for limiting the removal of Alcatraz Shoal to
that portion westward of a north-and-south line 2,500 feet west of
Alcatraz Light; for a depth of 35 feet in the approach channel to
Islais Creek; and for the elimination from the project of the area
south of the flared approach channel to Islais Creek; all at an esti-
mated cost of $498,000, in addition to cost of completing the present    1NSi.:-




project, with no increase in the present estimated cost of mainte-         {     -.-   :--.


                                                                                                  j.:   j
                                                                                                               i




nance (Rivers and Harbors Committee Doc. No. 50, 72d Cong.,
2d sess.)    (Included in part in the Public Works program.)
   Terminal facilities.-The State has 43 piers, 15 passenger- and              ::1            .     .       ''..r




automobile-ferry slips, 5 car-ferry slips, a large union passenger
depot, some 5 miles of bulkhead wharves parallel to the sea wall,
1254     REPORT OF CHIEF OF ENGINEERS,         U.   S.   ARMY,   1934


providing an aggregate of 17.2 miles of berthing space. The exist-
ing facilities are considered to be adequate for present needs. (See
Port Series No. 12, Corps of Engineers.)
   Operations and results during fiscal year--Existing project.-The
U. S. hopper dredge San Pablo removed 27,989 cubic yards from
Presidio Shoal as maintenance. The cost was $3,236.16, all for main-
tenance; the expenditures were -$38,015.13.
   Project authorized by Federal Emergency Administration of Pub-
lic Works.-The U. S. hopper dredge Culebra worked on this project
for about 61/3 months, during the winter, and removed the following
quantities: Bar channel, 2,542,421 cubic yards; Point Knox Shoal,
225,361 cubic yards; Black Point Shoal, 292,828 cubic yards. Under
this program, also, the U. S. hopper dredge San Pablo removed
4,295 cubic yards from Point Knox Shoal. This was all new work.
The cost was $140,812.64; the expenditures were $143,134.91.
   Condition at end of fiscal year.-The existing project is 59 percent
completed. The dredging of area E of the Islais Creek Shoal was
completed in 1930, the deepening of Presidio Shoal in 1931, the re-
moval of various rocks in 1932, and the bar channel in 1933.
   Under the Public Works Administration project, Point Knox
Shoal was completed in 1934 and the bar channel deepened to 48 feet.
   The controlling depths over various items of the project and the
dates on which these depths were determined are as follows: Bar
channel, 48 feet, March 8, 1934; Islais Creek Shoal, 33 feet, April 6,
1934; Presidio Shoal, 37 feet, February 21, 1934; Point Knox Shoal,
35 feet, March 22, 1934; Rincon Reef Rock (inner), 41 feet, August
27, 1932; Rincon Reef Rock (outer), 41 feet, August 20, 1932; Blos-
som Rock, 42 feet, May 10, 1932; Arch Rock, 35 feet, August 19, 1932;
Shag Rocks Nos. 1 and 2, both 37 feet, August 25, 1932; Harding
Rock, 35 feet, August 3, 1932. Work on the other features of the
project has not advanced sufficiently to affect the depths shown in the
project document. The work remaining to be done on the entire
improvement is the completion of the removal of Alcatraz Shoal,
Black Point Shoal, and Raccoon Shoal and a portion of Islais Creek
Shoal south of and adjacent to area E. The last named has been
recommended for abandonment.
   The cost of the existing project to the end of the fiscal year was
$835,801.03 for new work and $29,559.33 for maintenance, a total of
$865,360.36. The expenditures were $765,649.53.
   The cost of work under the Public Works Administration project
was $140,812.64, all for new work; the expenditures were $143,134.91.
   The total cost, all funds, was $1,006,173, of which $976,613.67 was
for new work and $29,559.33 for maintenance. The total expenditure
was $908,784.44.
   Proposed operations.-The balance unexpended from the National
Industrial Recovery Act, including accounts receivable, on July 1,
1934, will be applied as follows:
Accounts payable June 30, 1934__ ___________-_____________      $220. 95
Deepening the bar channel and removing Raccoon, Alcatraz, and
  Black Point Shoals, with Government plant and hired labor,
  September and October 1934_ ______  _______________         46,187. 36
Removing the wreck of the A. H. Lunsman, by contract, April 1935_ 23, 000. 00
       Total------------_--__-                                          69, 408.31
        RIVERS AND             HARBORS-SAN                FRANCISCO, CALIF., DISTRICT 1255

   The balance unexpended from regular appropriations, including
accounts receivable, on July 1, 1934, will be applied as follows:
Accounts payable June 30, 1934-----------------------------                                              $3,375.32
Maintenance dredging on the bar channel and on Presidio Shoal,
  with Government plant and hired labor, -November 1934 to Feb-
  ruary 1935    --------------------------------------------                                             95, 000. 00
Balance remaining ------                                                                                 40, 546. 24
        Total_                                                                                          1--------------------138,
                                                                                                              921. 56
  The additional sum of $110,000 can be profitably expended during
the fiscal year 1936 for maintenance dredging on the bar channel
and the shoals within the bay, with Government plant and hired
labor, from November 1935 to February 1936. This work will be
necessary to maintain adequate depths for commerce.
                                       Cost and financial summary

                             MAINTENANCE            AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934_____                      $1,866,200.02
Cost of maintenance to June 30, 1934-----------------------   504, 880. 28

      Total cost of permanent work to June 30, 1934 -------      2, 371, 080. 30
Value of plant, materials, etc., on hand June 30, 1934---------- 1,020, 639. 28

      Net total cost to June 30, 1934---------------------3, 391, 719. 58
Plus accounts receivable June 30, 1934---------------- ----   - 8, 867. 61

     Gross total costs to June 30, 1934-------------------                                         3,400, 587. 19
Minus accounts payable June 30, 1934 ---      --------                                                 3, 375. 32

      Net total expenditures----------------------------                                           3, 397, 211. 87
Unexpended balance June 30, 1934                                                                       30, 053. 95
                                                                                                      1-------------------------

         Total amount appropriated to June 30, 1934-----------3,                                        527, 265. 82

   Fiscal year ending June 30               1930           1931            1932            1933              1934


Cost of new work---------__              $41, 902. 75    $30, 718. 43   $329, 724. 99   $421, 755.94 .
Cost of maintenance--
                    .....---------..      14, 678. 01    145, 578. 83     25, 496. 93         448. 36        $3, 236.16

      Total cost----------------           56, 580. 76   176, 297. 26    355, 221.92     422, 204. 30          3, 236. 16

Total expended_-----_-----------           50, 234. 59   114, 798. 30    351, 886. 52    382, 113. 99       -38, 015. 13
Allotted...                                30, 000. 00
               ........ .....----------------------      360, 000. 00    -6, 184.94      433, 114. 15        25, 732. 87


Balance unexpended July 1,1933                                                                          $66, 305.95
Amount allotted from War Department Appropriation Act approved
  Apr. 26, 1934--------------------------                                                                 69,200. 00

      Amount to be accounted for     ---------------------------                                        135, 505. 95
Deductions on account of revocation of allotment             __-                                         43, 467. 13

         Net amount to be accounted for-------------------------                                         92, 038. 82
1256          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

Gross amount expended__-----------------------$157,     803. 18
Less-
    Reimbursements collected                  --------
                                     $195, 814. 31
    Receipts from sales--__________          4. 00
                                                   195, 818. 31
                                                                                                          -$38,     015. 13
      Balance unexpended June 30, 1934_--..................-                                                130, 053. 95
Outstanding liabilities June 30, 1934________________________                                                 4, 690. 86
     Balance available June 30, 19364______-----------4                                             ---     125, 363.09
Accounts receivable June 30, 1934__-______________---                                       ____              8,867. 61

          Unobligated balance available June 30, 1934 --.--------                                          - 134, 230. 70
Amount that can be profitably expended in fiscal year ending June
                             _
30, 1936, for maintenance 1    -- ----           -   _         -
                                                              __-                                           110, 000. 00
                                              PUBLIC WORKS FUND

Cost of new work to June 30, 1934_________________---------                                                $140, 812. 64
Cost of maintenance to June 30, 1934___________________________

    Total cost of permanent work to June 30, 1934 ______________                                            140,812. 64
Plus accounts receivable June 30, 1934____.___________--____                                                  2,543. 22

      Gross total costs to June 30, 1934________-------     _____                                            143, 355. 86
Minus accounts payable June 30, 1934 _______________--________                                                    220. 95
     Net total expenditures__-__-__--------------------                                                     143, 134. 91
                                ---------------------------
Unexpended balance June 30, 1934_                                                                            66, 865. 09

          Total amount appropriated to June 30, 1934_____________                                            210, 000. 00

          Fiscal year ending June 30                    1930            1931         1932           1933             1934


Cost ofnew work--- _----------------------                                                                        $140,  64
                                                                                                                      812.
Cost of maintenance-----                   -------------
Total expended .---..             -. ------      ----          -----       -------                                 143,134. 91
Allotted ------...._.___-_-   _        ... .
                                  -.............                   -.            -          -----          ---     210, 000. 00


Amount allotted from National Industrial Recovery Act approved
  June 16, 1933    ---------------------------------------- $275, 000. 00
Deductions on account of revocation of allotment--------------- 65, 000. 00

      Net amount to be accounted for---_- --    --------                                                    210, 000. 00
Gross amount expended ---
                       _---_------------------        $197, 657. 02
Less reimbursements collected --------------------       54, 522.11
                                                                                                            143, 134. 91

      Balance unexpended June 30, 1934_ ....---.---------                                                        66, 865.00
Outstanding liabilities June 30, 19341111111111111111111                                            1             1,393. 56

     Balance available June 30, 1934 .-------. ------------   - 65, 471.53
Accounts receivable June 30, 1934----------------------------    2, 543.22

          Unobligated balance available June 30, 1934_ ....... ___                                    --         68, 014. 75

   1Exclusive       of available funds.
           RIVERS AND HARBORS-SAN                                FRANCISCO, CALIF., DISTRICT                           1257
       CONSOLIDATED           COST AND FINANCIAL SUMMARY FOR SAN FRANCISCO HARBOR

Cost of new work to June 30, 1934___                                                                          $2, 007, 012. 66
Cost of maintenance to June 30, 1934__                                  -     ___        ___-___-                 504, 880. 28

      Total cost of permanent work to June 30, 1934_..........                                                 2, 511, 892. 94
Value of plant, materials, etc., on hand June 30, 1934_.........                                               1, 020, 639. 28

      Net total cost to June 30, 1934 -----------------------                                                  3, 532, 532. 22
Plus accounts receivable June 30, 1934------------------------                                                     11, 410. 83

     Gross total costs to June 30, 1934___-_____--                                                --           3, 543, 943. 05
Minus accounts payable June 30, 1934--   -   ___                                                                    3, 596. 27
     Net total expenditures ----------------------------                                                       3, 540, 346. 78
Unexpended balance June 30, 1934    __________-----__                                                    _-       196, 919. 04

           Total amount appropriated to June 30, 1934___-------                                                3, 737, 265. 82

    Fiscal year ending June 30                    1930           1931            1932                  1933           1934


Cost of new work............--------------      $41, 902. 75   $30,718. 43    $329,724.99        $421, 755. 94      $140, 812. 64
Cost of maintenance--..........                  14, 678. 01   145, 578. 83     25, 496. 93            448. 36         3, 236. 16

       Total cost----------------                56, 580. 76   176, 297. 26    355, 221. 92       422, 204. 30       144, 048. 80
                 ......---------.
Total expended-------                            50, 234. 59   114, 798. 30    351, 886. 52       382, 113. 99       105, 119. 78

Allotted                                 ...
                        ---..............-...    30, 000. 00   360, 000. 00    -6, 184. 94        433, 114. 15       235, 732. 87


Balance unexpended July 1, 1933                                    $66, 305.95
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934____________________--    $69, 200. 00
Amount allotted from National Industrial Recovery Act
  approved June 16, 1933_-----     __------__-------- 275, 000.00
                                                                   344, 200. 00

      Amount to be accounted for___ __________-_____- 410, 505. 95
Deductions on account of revocation of allotment-_-------- 108, 467. 13

      Net amount to be accounted for- - __----__                                                                 302, 038. 82
Gross amount expended __-- __     -_______ ___                                           $355, 460. 20
Less:
      Reimbursements collected -----                                    $250, 336. 42
      Receipts from sales__------------                                         4. 00
                                                                                              250, 340. 42
                                                                                                                 105, 119. 78
      Balance unexpended June 30, 1934_________________________ 196, 919. 04
Outstanding liabilities June 30, 1934_6__6_______----_____ -      6, 084. 42

     Balance available June 30, 1934      .__.                                                     ____          1__________
                                                                                                                 190, 834. 62
Accounts receivable June 30, 1934_______________                                                                  11, 410. 83

           Unobligated balance available June 30, 1934_...__-                                       ____         202, 245. 45

Amount that can be profitably expended     in fiscal year ending June
                          1 -- -- -- -- -- -- -- -- -- --- -- --
30, 1936, for maintenance _________________                     __   110, 000.00

                                        2. OAKLAND HARBOR, CALIF.
  Location.--Located on the eastern side of San Francisco Bay.
opposite the city of San Francisco. The inner harbor is situated
between the cities of Oakland and Alameda. (See U. S. Coast and
Geodetic Charts Nos. 5531 and 5532.)
  1Exclusive of available funds.
1258   REPORT OF CHIEF OF ENGINEERS,       U.   S.   ARMY,   1934


   Previous pro jects.-Adopted by the River and Harbor Acts of
June 23, 1874, June 13, 1902, March 2, 1907, and June 25, 1910. The
costs and expenditures of the original and modified projects prior
to the adoption of the existing project were $4,386,801.03 for new
work and $684,028.18 for maintenance, a total of $5,070,829.21. For
further details see page 1979 of Annual Report for 1915, and page
1755 of Annual Report for 1921.
   Existing project.-This provides for an entrance channel about
12 miles long, 30 feet deep, and 800 feet wide, through the shoal
southeast of Yerba Buena Island, narrowing to 600 feet at the ends
of Oakland Jetties; a channel from the ends of the jetties to
the tidal canal, 30 feet deep, 600 feet wide, to the west end of Gov-
ernment Island, thence 500 feet wide through Brooklyn Basin; for
dredging to a depth of 30 feet a triangular area about 2,700 feet
long and of a maximum width of 300 feet at the western end of
Brooklyn Basin; a turning basin at the east end of Brooklyn Basin
30 feet deep, 500 feet wide, and 1,200 feet long; a channel 1.9 miles
long in the tidal canal, 30 feet deep and 275 feet wide from the
Brooklyn Basin to Park Street, and 25 feet deep above the Park
Street Bridge, to San Leandro Bay; a total channel length of 81/2
miles. The project provides also for an entrance channel to the outer
harbor, 30 feet deep and 800 feet wide at the bay end, narrowing
to 600 feet at the pierhead line. The project also includes parallel
rubble-mound jetties at the entrance, a north jetty 9,500 feet long,
and a south jetty 12,000 feet long; the maintenance of the north
channel of Brooklyn Basin, 25 feet deep and 300 feet wide, the main-
tenance to 30-feet depth and to within 75 feet of the pierhead line
of the area along the south side of the channel from Harrison Street
eastward to harbor line point no. 58 in Brooklyn Basin; and 3
highway bridges across the tidal canal, constructed by the United
States and operated by local authorities, one of which (at Park
Street) is being replaced by local interests.
   All depths refer to mean lower low water.
    The range between mean lower low water and mean higher high
water is 6.1 feet and the extreme range is 11 feet.
    The estimated cost of new work, authorized by the acts of Sep-
tember 22, 1922, January 21, 1927, and July 3, 1930, is $1,492,000,
exclusive of amounts expended on previous projects and of which
 $150,000 is to be contributed by local interests. Overdepth dredg-
ing in the main channel, in the nature of deferred maintenance,
involved an estimated expenditure of $1,035,000. The latest (1930)
approved estimate for annual cost of maintenance is $110,000.
    The existing project was authorized by the following river and
harbor acts: The jetties, by the act of June 23, 1874 (Annual Report
for 1874, pp. 382-383); the north channel in Brooklyn Basin, by
the act of June 25, 1910 (H. Doc. No. 647, 61st Cong., 2d sess.); the
channel across the shoal southeast of Yerba Buena Island, and thence
to Webster Street, the south channel in Brooklyn Basin, the turning
  basin at the east end of Brooklyn Basin, the channel in the tidal
  canal from Brooklyn Basin to Park Street, by the act of September
22, 1922 (H..Doc. No. 144, 67th Cong., 2d sess.); the entrance chan-
  nel to the outer harbor by the act of January 21, 1927, as modified
  by the act of July 3, 1930 (Rivers and Harbors Committee Docu-
  ment No. 43, 71st Cong., 2d sess.); the channel from Webster Street
     RIVERS AND HARBORS-SAN       FRANCISCO,   CALIF., DISTRICT   1259

to Brooklyn Basin, the maintenance of the area to within 75 feet
of the pierhead line south of the channel from Harrison Street to
harbor line point no. 58 in Brooklyn Basin, the dredging of a
triangular strip about 2,700 feet long and having a maximum width
of 300 feet and the deepening to 25 feet of the tidal canal above Park
Street to San Leandro Bay, by the act of January 21, 1927 (H. Doc.
No. 407, 69th Cong., 1st sess.), as modified by the act of April 28,
1928. The drawbridges across the tidal canal were required by the
decree of the court in the condemnation proceedings whereby title
was obtained to the right-of-way for the tidal canal. The latest
published maps are in House Document No. 407, Sixty-ninth Con-
gress, first session, and Rivers and Harbors Committee Document
No. 43, Seventy-first Congress, second session.
   Local cooperation.--All requirements of local cooperation have
been satisfactorily met except those pertaining to the maintenance of
the north channel in Brooklyn Basin and the deepening of the tidal
canal.
    Terminal facilities.-There are 84 wharves and 13 ferry slips in
the harbor. These facilities are considered adequate for existing
commerce. (See Port Series No. 12, Corps of Engineers.)
    Operations and results during flscal year.-The U. S. hopper
dredge San Pablo worked in Oakland Inner Harbor easing the bend
just east of the shoreward end of the north training wall, removing
13,131 cubic yards of material as maintenance.
    The cost was $3,476.03, all for maintenance. The expenditures
were $3,211.88.
   Condition at end of fiscal year.-The project is about 82 percent
completed. In February 1934 the channel across the shoal south-
east of Yerba Buena Island was 31 feet deep for the full width of
800 feet except along the extreme northern edge, where the depth is
29 feet. The entrance channel to the outer harbor was 32 feet deep,
800 feet wide at the bay end, and 600 feet wide at the pierhead line.
The inner harbor channel was 32 feet deep, 800 feet wide at the bay
end, 600 feet wide from the harbor entrance to Oak Street, Oak-
land, widening to 800 feet at the outfitting wharf of the Bethlehem
Shipbuilding Corporation, again widening to 1,200 feet at the west-
ern end of Brooklyn Basin; thence narrowing to 500 feet at the
eastern end of Fortmann Basin, which width continues to Chestnut
Street, Alameda. A small shoal 29 feet deep existed in the south-
erly part of the above channel between Alaska Basin and Fortmann
Basin. The depth in the turning basin at the east end of Brooklyn
Basin varied from 18 to 29 feet. Thence in the tidal canal, the
depth was 29 feet to Oak Street, Alameda. The north channel in
Brooklyn Basin was 20 feet deep and 200 feet wide. In July 1933
the tidal canal between Oak Street, Alameda, and San Leandro Bay
was 16 feet deep and 300 feet wide. The work remaining to be done
is the deepening of the tidal canal.
   The cost of the existing project to the end of the fiscal year was
$1,218,009.23 for new work, of which $1,134,462.21 were United
States funds and $83,547.02 contributed funds, and $1,326,752.96 for
maintenance, a total of $2,544,762.19. The expenditures were
$2,556,371.51, of which $2,472,824.49 were from United States funds
and $83,547.02 from contributed funds.
1260          REPORT OF CHIEF OF ENGINEERS3                                    U. S. ARMY,               1934

   Proposed operations.-The balance                                          unexpended,           including           ac-
counts receivable, on July 1, 1934, will be applied as follows:
Accounts payable June 30, 1934 _ _____--------                     $101. 80
Maintenance dredging in the entrance channels and in the inner
  harbor, by contract and with Government plant and hired labor,
August 1934 to February 1935------          -----------------   21,026.08

          Total--__---------------                           -------------------------                         21, 127.88
   The sum of $65,000 can be profitably expended during the fiscal
year 1936 for maintenance dredging in the entrance channels and
in the channel in the inner harbor, with Government plant and hired
labor, during the period April to June 1936. The work will be neces-
sary to maintain the project channels.
                                       Cost and financial summary
Cost of new work to June 30, 19341                           ---------------------------                 $5, 521, 263. 24
Cost of maintenance to June 30, 1934-----------------------2, 010, 781. 14
      Total cost of permanent work to June 30, 1934----------                                             7, 532, 044. 38
Value of plant, materials, etc., on hand June 30, 1934----------                                              11, 070. 26

      Net total cost to June 30, 1934----------------------- 7, 543, 114. 64
Plus accounts receivable June 30, 1934 -----------------------       640. 86

      Gross total costs to June 30, 1934-------------------- 7, 543, 755. 50
Minus accounts payable June 30, 1934------------------------         101. 80
     Net total expenditures -----------------------------   7, 543, 653. 70
Unexpended balance June 30, 1934---------------------------     20, 487. 02
           Total amount appropriated to June 30, 19341-------------                                       7, 564, 140. 72

    Fiscal year ending June 30                 1930             1931             1932             1933            1934


Cost of new work.__....__. .       _        $53, 792. 70     $125, 475. 02     $65, 110. 18 _
Cost of maintenance ..------------          202, 874. 01      393, 114. 78      99, 734. 70     $19. 699. 97      $3, 476. 03
        Total cost---------------           256, 666. 71      518, 589. 80     164, 844. 88      19, 699. 97       3. 476. 03
Total expended..      .......---------------- 253, 486. 12    427, 568. 28     289, 527. 10      18, 665. 83       3, 211.88
Allotted---
         ........   --    ..   ..... -      480, 000. 00      195, 000.00       22, 888. 41      19, 562. 79      20, 552. 33


Balance unexpended July 1, 1933       _____                                                                    $3, 146. 57
Amount allotted from War Department Appropria-
tion Act approved Apr. 26, 1934____   ____    __ $15, 700. 00
Amount allotted from War Department Appropria-
tion Act approved Mar. 4, 1933-------------------- 5,      00                                   000.

                                                                                                               20, 700. 00
     Amount to be accounted for _-       --
                                       ___-        -__ -      -__________-_
                                                                       23, 846. 57
Deductions on account of revocation of allotment ___       _____--
                                                         -----             147. 67
      Not amount to be accounted for            __- _-------.-__
                                                           -___-_23, 698 90
Gross amount expended-----------------------     - $8, 208. 43
Less reimbursements collected_______ _____ ____     4, 996. 55
                                                                  3, 211. 88
      Balance unexpended June 30, 1934        ______     _____ _ 20, 487. 02
Outstanding liabilities June 30, 1934__----------------------------  170. 38
           Balance available June 30, 1934______________-                                       -____          20, 316. 64

    1 In addition, $83,547.02 was expended from contributed funds.
      RIVERS AND HARBORS-SAN          FRANCISCO,    CALIF., DISTRICT     1261
Accounts receivable June 30, 1934-----------------------------        $640. 86

      Unobligated balance available June 30, 1934--------------     20, 957. 50

Amount (estimated required to be appropriated for completion of
existing project -------------------------------------         207, 500. 00

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1---------- ---------------------        65, 000. 00

                     3. RICHMOND HARBOR, CALIF.

   Location.-Located on the eastern shore of San Francisco Bay
about 10 miles north of Oakland. (See U. S. Coast and Geodetic
Chart No. 5532.)
   Existing project.-This provides for a channel 30 feet deep from
San Francisco Bay to Ellis Slough, 400 feet wide between the bay
and the turning basin at Municipal Wharf No. 1; thence 300 feet
wide to Point Potrero; thence 475 feet wide to the north turning
basin; for a turning basin 800 feet square with suitable approach
widening at the northerly end of the improvement; for the main-
tenance of a turning basin opposite Point Potrero with a maximum
width of 750 feet; and for the construction of a training wall 10,000
feet long extending in a general westerly direction from Brooks
Island. All depths refer to mean lower low water. The tidal range
between mean lower low water and mean higher high water is 5.9
feet, with an extreme range of 11.0 feet.
   The estimate of cost for new work, revised in 1930, is $1,174,000.
The latest (1933) approved estimate for annual cost of maintenance
is $20,000. The existing project was adopted by the following river
and harbor acts: The act of August 8, 1917, provided for a channel
24 feet deep, 600 feet wide, and for the training wall (H. Doc. No.
515, 63d Cong., 2d sess.); and the act of July 3, 1930, provided for a
channel 30 feet deep, with widths as specified above (Rivers and
Harbors Committee Doc. No. 16, 70th Cong., 1st sess.). The latest
published map is in Rivers and Harbors Committee Document No. 7,
Seventy-third Congress, first session.
   Supplementing the work authorized by Congress, the provision of
a channel 30 feet deep and 500 feet wide between Terminals Nos. 1
and 2, and widening the channel to 1,000 feet off Point Potrero and
a turning basin 850 feet wide and 1,000 feet long opposite Terminal
No. 3, as recommended by the Chief of Engineers in Rivers and
Harbors Committee Document No. 7, Seventy-third Congress, first
session, has been included in the Public Works program under the
National Industrial Recovery Act.
   Recommended modifications of project.-Included in Public
Works program.
   Local cooperation.-The acts adopting the project require local
interests to contribute one-half the first cost of the work. Local
interests have fulfilled all requirements for work done to date.
   The work included in the Public Works program is subject to the
condition that local interests furnish all disposal areas.
   Terminal facilities.-There are. 8 wharves and 4 ferry slips in
Richmond Harbor and 5 wharves in Ellis Slough and minor water-
ways tributary to Richmond Harbor at its northern extremity.
  1 Exclusive of available funds.
1262    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                        1934

    Operations and results during fiscal year.--Project authorized by
Federal Emergency Administration of Public Works. The channel
between Terminal No. 1 and Point Potrero was widened to 500 feet,
the turn at Point Potrero to 1,000 feet, and a turning basin, 850
feet wide and 1,000 feet long dredged opposite Terminal No. 3, by
contract under the Public Works program. A total of 1,683,495
cubic yards of material were removed, all new work. The cost and
expenditures were $105,000 for new work.
    Existing project.-A strip 200 feet wide between Terminal No. 3
and the harbor line at the head of the project was dredged 30 feet
deep by contract, involving the removal of 38,800 cubic yards. The
United States hopper dredge San Pablo removed 155,825 cubic yards
of material from various small shoals between the turn in the channel
west of Point Richmond and Point Potrero. Under contract, 8,274.9
tons of stone were placed on the training wall. These last three
items were maintenance work.
    The cost and expenditures were $29,487.54 for maintenance.
    Condition at end of fiscall year.-The entire improvement is about
90 percent completed. The chanenl from deep water in San Fran-
cisco Bay to Terminal No. 1 near Point Richmond is now 400 feet
wide, thence to Point Potrero 500 feet wide, thence 1,000 feet wide
around the turn at Point Potrero, thence 475 feet wide to a point 125
feet north of the southern end of Terminal No. 2, thence 200 feet wide
to the pierhead line at the northern end of the channel with a widen-
ing to 850 feet for a length of 1,000 feet opposite Terminal No. 3.
All the channel is 30 feet deep at mean lower low water. The work
remaining to be done is the widening of the turning basin to 800 feet
and deepening to 30 feet, and constructing a suitable approach.
    The cost of the existing project to the end of the fiscal year was
 $1,043,730.06 for new work ($518,952.40 from regular funds and
 $524,777.66 from contributed funds) and $253,555.74 for maintenance
  ($218,755.54 from regular funds and $34,800.20 from contributed
funds), a total of $1,297,285.80. The expenditures were $1,297,285.80,
of which $737,707.94 was from regular funds and $559,577.86 from
contributed funds.
    Under the Public Works Administration project the costs and ex-
penditures were $105,000 for new work.
    Proposed operations.-The balance unexpended July 1, 1934,
amounting to $502.01, will be applied to surveys and inspections.
    No work is contemplated for the fiscal year 1936.
                            Cost and fin ancial summary
                      MAINTENANCE           ANEI IMPROVEMENT   FUNDS

Cost of new work to June 30, 1934 __......___-- ___  ------ $518, 952. 40
Cost of maintenance to June 30, 1934___ _____ __    ________218, 755. 54

       Total cost of permanent work to June 30, 19341____              ____   737, 707.94
Net total expenditures   1______________                                     737, 707. 94
Unexpended balance June 30, 1934----..--------------__--__                       502.01
       Total amount appropriated to June 30, 19341__________                738, 209. 95
   1Excluding $559,577.86 contributed funds, of which $524,777.66 was for new work and
 $34,800.20 for maintenance; in addition $275,414.77 was expended from contributed funds
for work outside the project.
        RIVERS AND HARBORS-SAN FRANCISCO, CALIF., DISTRICT 1263


   Fiscal year ending June 30                1930                 1931                   1932           1933                1934

Cost of new work.-------.-..          $82, 703. 33           $106, 979. 83          $58, 459. 15 ..    .............
Cost of maintenance_____
                     ....   ___________________           _______-----               34, 579. 61              $83. 00      $29, 487. 54

      Total cost----------------82,            703. 33         106, 979. 83          93, 038. 76               83. 00       29, 487. 54

Total expended...-.-............            57, 658. 92        103, 567. 60         121, 628. 59               83. 00       29, 487. 54

Allotted_--.-----------.----140, 000. 00 ------------                                16, 800. 00          -79. 60           29, 989.55


Amount allotted from War Department Appropriation Act approved
Mar. 4, 1933 ---------------------------------------------- $30, 000. 00
Deductions on account of revocation of allotment__---------------  10. 45

      Net amount to be accounted for---------------------------                                                          29, 989. 55
Gross amount expended__--_---__--------------___-_                                                                       29, 487. 54

         Balance unexpended June 30, 1934-------------------------                                                          502. 01

Amount (estimated) required to be appropriated for completion of
existing project 1--------------------------------------------                                                          12, 000. 00
                                              PUBLIC WORKS FUNDS

Cost of new work to June 30, 1934 ______     __--__---___                                                                 $105, 000
Cost of maintenance to June 30, 1934----------------------                                                              --------
      Total cost of permanent work to June 30, 1934_                                                                       1______-____
                                                                                                                           105, 000
Net total expenditures ------------------                                                                                  105, 000
Total amount appropriated to June 30, 1934 -----------------------                                                         105, 000

         Fiscal year ending June 30                        1930              1931               1932           1933           1934


Cost of new work    ..----------            -----------------------------------------------                        $105, 000.00
                     _---
Cost of maintenance-----              ------------                 -------          -------            ------------------------
Total expended ...---------------                                 -----------------------------------                      105, 000. 00
                                          I...             .
Allotted_...------------------------------------------------..
                  .                                                                                                        105, 000. 00


Amount allotted from National Industrial Recovery Act approved
June 16, 1933--------------------------------------------- $105, 000. 00
Gross amount expended ___                           ___________----___105,                                                   000. 00

         CONSOLIDATED COST AND FINANCIAL SUMMARY FOR RICHMOND HARBOR

Cost of new work to June 30, 1934-----------------------------$623,      952. 40
Cost of maintenance to June 30, 1934______-__________--             218, 755. 54

         Total cost of permanent work to June 30, 1934 2-------------842,                                                    707. 94
                                        -                                    -       -                    -
Net total expenditures 2_______________ __ _  ________      _                                                           842, 707. 94
Unexpended balance June 30, 1934------------------------------                                                               502. 01
         Total amount appropriated to June 30, 1934 2________ ____                                                      843, 209. 95
  1 Exclusive of available funds.
  " Excluding $559,577.86 contributed funds, of which $524,777.66 was for new work and
$34,800.20 for maintenance; in addition $275,414.77 was expended from contributed funds
for work outside the project.
         91536--ENG 1934-          80
1264            REPORT OF CHIEF OF ENGINEERS,                                      U.    S.       ARMY,     1934


     Fiscal year ending June 30                    1930                 1931         1932            1933             1934


Cost of new work---.......-----------..          $82, 703. 33 $106, 979. 83        $58, 459. 15------        _      $105,000. 00
Cost of maintenance_______------                 --------------                     34, 579. 61       $83. 00         29, 487. 54
        Total cost..-------------          ---    82, 703. 33       106, 979. 83    93, 038. 76           83. 00     134, 487. 54
Total expended- ----------------                  57, 658. 92       103, 567. 60   121, 628. 59           83. 00     134, 487. 54
Allotted ......--------........
                            ------------         140, 000. 00 -------------         16, 800. 00       -79. 60        134, 989. 55


Amount allotted from War Department Appropriation Act approved
Mar 4, 1933--$30,----------------------------------------------$30, 000. 00
Amount allotted from National Industrial Recovery Act approved
June 16, 1933-------------------------------- -------------- 105, 000. 00

      Amount to be accounted for----------------------------- 135, 000.00
Deductions on account of revocation of allotment------------------  10. 45

      Net amount to be accounted for--------------------------- 134, 989. 55
Gross amount expended ---------------------------             -134,  487. 54

            Balance unexpended June 30, 1934-------------------------                                                  502. 01
Amount (estimated) required to be appropriated for completion of
    existing        project       1---            ----              ---------                                      12, 000. 00

              4. SAN PABLO BAY AND MARE ISLAND STRAIT, CALIF.

   Location.-The channel extends from a point in the lower end of
San Pablo Bay west of Pinole Point in a general northeasterly
direction across Pinole Shoal in San Pablo Bay to the junction of
Carquinez Strait and Mare Island Strait, thence northwesterly in
Mare Island Strait to the causeway connecting the Mare Island
Navy Yard with the city of Vallejo. (See U. S. Coast and Geodetic
Survey Chart No. 5533.)
   Previous projects.--Adopted by the River and Harbor Acts of
June 13, 1902, February 27, 1911, and August 8, 1917. The total cost
was $2,446,083, of which $1,086,703.45 was for new work and $1,359,-
379.55 was for maintenance. The total expenditures were $2,639,-
730.97. The above total does not include $22,422.40 recovered by a
contractor subsequently through a ruling by the auditor for the War
Department. (For further details for San Pablo Bay see p. 1981
of Annual Report for 1915, and for details of Mare Island Strait
improvement by the Navy Department see p. 4 of H. Doc. No. 1103,
60th Cong. 2d sess.)
  Existing project.-This provides for dredging a channel across
Pinole Shoal in San Pablo Bay 600 feet wide and 35 feet deep;
thence through Mare Island Strait a channel 600 feet wide and 30
feet deep, with a turning basin 1,000 feet wide in front of the quay
wall, 30 feet deep, except in the northeast corner adjacent to the
causeway and the northerly limits of the city of Vallejo, where the
project depth is 26 feet. All depths refer to mean lower low water.
The tidal range between mean lower low water and mean higher high
water is 5.9 feet at the lower end of San Pablo Bay, and 6.6 feet
opposite the Mare Island Navy Yard, with an extreme range of
about 10 feet.
    1Exclusive of available funds.
     RIVERS AND HARBORS-SAN         FRANCISCO,    CALIF.,   DISTRICT 1265

   The estimate of cost for new work, revised in 1928, was $750,000,
including $500,000 estimated cost of maintenance during progress of
work, but exclusive of amounts expended on previous projects. The
latest (1931) approved estimate for annual cost of maintenance is
$165,000.
   The existing project was authorized by the following river and
harbor acts: The act of February 27, 1911, provided for a depth of
30 feet through Pinole Shoal (H. Doc. No. 1103, 60th Cong., 2d
sess.); the act of August 8, 1917, provided for a depth of 35 feet
and the turning basin (H. Doc. No. 140, 65th Cong., 1st sess.) ; and
the act of January 21, 1927, provided for increasing the width of
the channel to 600 feet and decreasing the channel depth in Mare
Island Strait to 30 feet (H. Doc. No. 104, 69th Cong., 1st secs.). The
latest published map is in the last-mentioned document.
   Terminal facilities.-There are 3 wharves along the southern shore
of San Pablo Bay, 2 along the northern shore, 11 wharves along the
southern shore of Carquinez Strait, and 4 on the northern shore of
this strait. In Mare Island Strait there are 5 commercial wharves
and 2 ferry slips, in addition to the navy yard facilities. The facili-
ties are adequate for existing needs.
    Operations and results during fiscal year.-The U. S. hopper
dredges San Pablo and A. Mackenzie removed 1,042,576 cubic yards
of material from the Mare Island Strait Channel and turning basin.
The cost was $51,705.54, all for maintenance. The expenditures
were - $2,95729.
   Condition at end of fiscal year.--The project was completed in 1929.
On May 3, 1933, the channel through Pinole Shoal was 36 feet deep
for the full width of 600 feet, except on the northern edge at Buoy
No. 7 where the depth was about 31 feet. On March 30, 1934, the
channel in Mare Island Strait was 29 feet deep to the magazine
wharf; thence 26 feet deep to the turning basin; thence the con-
trolling depth was 25 feet except in the extreme upper end where the
least depth was about 20 feet.
   The cost of the existing project to the end of the fiscal year was
 $132,923.90 for new work and $490,515.39 for maintenance, a total
of $623,439.29. The expenditures were $537,223.12.
   Proposed operations.-The balance unexpended, including ac-
counts receivable, on July 1, 1934, will be applied as follows:
Accounts payable, July 1, 1934   ------------------------------    $1, 146. 99
Maintenance dredging in Mare Island Strait Channel and turning
basin, and in Pinole Shoal Channel, with Government plant and
hired labor, July 1934, October 1934 to January 1935 and
June 1935 ---------------------------------------        -----    09, 027. 68

      Total ---   --------------------------------------          110, 174. 67
  The additional sum of $90,000 can be profitably expended during
the fiscal year 1936 on maintenance dredging in Mare Island Strait
Channel and turning basin, and in Pinole Shoal Channel, with Gov-
ernment plant and hired labor, September 1935 to February 1936.
The work will be necessary to provide adequate depths for
navigation.
1266       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

                                      Cost and financial summary

Cost of new work to June 30, 1.934-----------------------                                         $1, 219, 627. 35
Cost of maintenance to June 30, 1934__1______1_____     1                                          1, 849, 894.94

      Total cost of permanent work to June 30, 1934----------3, 069, 522. 29
Value of plant, materials, etc., on hand June 30, 1934_ .... __ -- 95, 702.03

      Net total cost to June 30, 1934-_______-- -----------                                        3, 165, 224. 32
Plus accounts receivable June 30, 1934------------------------                                         12, 876.76

     Gross total costs to June 30, 1934 ---.     _____---------                                    3, 178, 101. 08
Minus accounts payable June 30, 1934 _____------------__-                                               1, 146. 99

     Net total expenditures_____---------- ------------------                                      3, 176, 954.09.
Unexpended balance June 30, 1934--------------------------                                             97,297. 91

        Total amount appropriated to June 30, 1934__---                                 ___-_      3, 274, 252. 00,

   Fiscal year ending June 30             1930             1931            1932            1933             1934


Cost of new work_----------------          $311. 69    --------------------------.         ..
Cost of maintenance------------          61, 745. 96     $74, 820. 05  $101, 516. 80     $20, 665. 86      $51, 705. 54

     Total cost-...   . -   - ..- -      62, 057. 65     74, 820. 05     101, 516. 80     20, 665. 86       51, 705. 54

Total expended----------------           38, 037. 43     83, 327. 82     48, 157. 46      47, 256. 29       -2, 957. 29

Allotted------------------------       -65, 000. 00     100, 000. 00   -115, 497. 91      44, 263. 41       74, 095. 69


Balance unexpended July 1, 1933                       _____ $20,244.93
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934_        _____         $81, 500.00
                                          -__________
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933___----------       ___  10, 000. 00
                                                               91, 500.00,

Amount to be accounted for______________         -__________---111,744.93
Deductions on account of revocation of allotment  _____--------17, 404. 31
       Net amount to be accounted for    ____-__--     --     _____                                     94, 340. 62
Gross amount expended ______-____      --          -______$188, 197.04
Less--
    Reimbursements collected----------     $191, 077. 58
    Receipts from sales------- ------  ---         76. 75
                                                           191, 154. 33
                                                                                                        -- 2, 957. 29
      Balance unexpended June 30, 1934__. ________                                         ___           97, 297. 91
Outstanding liabilities June 30, 1934-----------------__ _                                   --           3, 567.15
     Balance available June 30, 1934 -----____---_____-                                                 93,730. 76
Accounts receivable June 30, 1934.___.____.. ____   __----                                              12, 876.76
        Unobligated balance available June 30, 1934_.--                                  ___----        106,607.52
Amount that can be profitably expended                            in fiscal year ending
June 30, 1936, for maintenance 1                                      ____                              90, 000. 00,

  1 Eclusive of available funds.
      RIVERS AND   HARBORS-SAN     FRANCISCO,   CALIF., DISTRICT1267

                    5. MONTEREY HARBOR, CALIF.

   Location.-Located about 90 miles south of San Francisco Bay, at
the south end of Monterey Bay, an indentation in the coast of
California. (See U. S. Coast and Geodetic Survey Chart No. 5403.)
   Previous projects.-Adopted by the River and Harbor Act of
July 25, 1912. No work was done. No expenditures were made.
   Ewisting project.-This provides for a breakwater 1,300 feet long,
with the shore connection extending about 750 feet due east from a
point about half-way between Reeside Avenue and the Presidio
boundary, and the outer section bearing about S. 70 ° E. The tidal
range between mean lower low water and mean higher high water is
5.5 feet. The extreme range is about 10 feet.
    The estimate of cost for new work, made in 1929, is $610,000. The
latest (1929) approved estimate for annual cost of maintenance is
 $18,000.
    The existing project was adopted by the River and Harbor Act of
July 3, 1930 (Rivers and Harbors Committee Doc. No. 12, 71st
Cong., 1st sess.). The latest published map is contained in this
document.
    Supplementing the work authorized by Congress the extension of
the breakwater for a length of about 400 feet as recommended by
the Chief of Engineers in Rivers and Harbors Committee Document
No. 45, Seventy-second Congress, first session, has been included in
the Public Works program under the National Industrial Recovery
Act.
    Recommended modifications of project.-Included in Public
Works program.
    Local cooperation.-Complied with.
    Terminal facilities.-The existing facilities consist of two wharves
with a total of about 2,600 feet of berthing space. The facilities are
considered adequate for existing commerce.
   Operations and results during fiscal year.-The existing project
breakwater, 1,300 feet long, was completed, under contract, 23,352
tons of stone being placed thereon, making a total of 213,315 tons of
stone in the structure. The cost was $49,250.08, all for new work;
the expenditures were $71,943.43.
   Under the project authorized by the Federal Emergency Admin-
istration of Public Works, the breakwater was extended an additional
400 feet, 114,912 tons of stone being placed thereon, under contract,
as new work. The cost and expenditures were $207,374.44.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1934, at a saving of $164,849 under the estimated cost.
The total cost of the existing project to the end of the fiscal year
was $445,151, all new work; the expenditures were $445,151.
   The extension authorized under the Public Works Administration
is practically completed. The cost and expenditures to the end of
the fiscal year were $207,374.44.
   Proposed operations.-No work is contemplated during the fiscal
years 1935 and 1936.
 1268               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                                                   1934

                                                            Cost and financial summary
                                               MAINTENANCE                   AND IMPROVEMENT                       FUNDS

Cost of new work to June 30, 1934__________________------                                                                                           $445, 151. 00
Cost of maintenance to June 30, 1934____      _____       __                                                                                        ----------
      Total cost of permanent work to June 30, 1934                                                                                                   45, 151. 00
                                                                                                                                                     4--------___
Net total expenditures      _________---__                                                                                                           445, 151. 00
Total amount appropriated to June 30, 1934 _----_____--------_                                                                                       445, 151.00

      Fiscal year ending June 30                                    1930                 1931                   1932                     1933             1934


Cost of new work.._________.___________                        ___......_...                                 $197, 935. 03         $197, 965. 89         $49, 250. 08
Cost of maintenance___                     ____-_---_......-.--
                                              ................
Total expended.....-------                           ------------                   ......--------------      186, 958. 11           186, 249.46          71, 943. 43

Allotted-------------                                    __----------               $200, 000. 00 --------------                     244, 446. 29            704. 71


Balance unexpended July 1, 1933___---------------------------  $71,238.72
Amount allotted from War Department Appropriation Act approved
Mar. 4, 1933---------------------------------------------         800. (10

     Amount to be accounted for-.. _____      _____---- _ _      _                                                                                    72, 038. 72
Deductions on account of revocation of allotment------------------                                                                                         95. 29

      Net amount to be accounted for                                                                                                                  7_______________
                                                                                                                                                       1, 943. 43
Gross amount expended      -----------------------------------                                                                                        71, 943. 4.3
                                                                    PUBLIC WORKS FUNDS

Cost of new work to June 30, 1934_______                                                                      __------------                        $207, 374. 44
Cost of maintenance to June 30, 1934

               Total cost of permanent work to June 30, 1934-----------207,                                                                               374. 44

Net total expenditures      _______--------____       -   --   207, 374. 44
Unexpended balance June 30, 1934 .-----------------------------     425. 56

               Total amount appropriated to June 30, 1934______________                                                                              207, 800. 00

               Fiscal year ending June 30                                       1930                  1931             1932                  1933          1934


Cost of new work.....----------                                                                         ......
                                                                    .....- ---------------------- --------------..-----..---                            $207, 374.44
Cost of maintenance---------------------------.-------------------------------
Total expended-----------                                        --------------------------------------------                                            207, 374. 44

Allotted-----------------------------------------------------                                                          -------------------               207, 800. 00



Amount allotted from National Industrial Recovery Act approved
  June 16, 1933-- --      ---------------------------------- $240, 000. 00
Deductions on account of revocation of allotment________________ 32, 200. 00

      Net amount to be accounted for------------------------207,        800. 00
Gross amount expended ________      ___________                    207, 374.44
                                                         ____--------

               Balance unexpended June 30, 1934_____________________                                                                                      425. 56
             RIVERS AND                     HARBORS-SAN                           FRANCISCO,               CALIF., DISTRICT 1269

             CONSOLIDATED COST AND FINANCIAL SUMMARY FOR MONTEREY HARBOR

Cost of new work to June 30, 1934__________________------                                                                       $652, 525. 44
Cost of maintenance to June 30, 1934 -- __---------------                                                                   ----------
             Total cost of permanent work to June 30, 1934-----------652, 525. 44

Net total expenditures-------   --- --------------------------                                                                    652, 525.44
Unexpended balance June 30, 1934 ___._________ __ __     _.-                                                                           425. 56

             Total amount appropriated to June 30, 1934__----------                                                               652, 951. 00

     Fiscal year ending June 30                            1930                   1931              1932             1933             1934


Cost of new work-..-............                            -...-........
                                                                    .. ....              .....   $197, 935.03     $197, 965. 89     $256, 624. 52
Cost of maintenance-------------------...........-------..........      .......            ---    -------        -------------------------
Total expended _-----                         -__................                  _ -_           186, 958. 11     186, 249.46       279, 317. 87
                  _
Allotted------------                               I___         _____     $200, 000. 00 -------------              244, 446. 29      208, 504. 71


Balance unexpended July 1, 1933-----------------------------      $71, 238. 72
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933------------------------       $800. 00
Amount allotted from National Industrial Recovery
Act approved June 16, 1933_--------------------      240,000. 00
                                                                  240, 800. 00
      Amount to be accounted for__________--- -------------                                                                       312,038. 72
Deductions on account of revocation of allotment _---------                                                                        32, 295. 29

      Net amount to be accounted for-__--------------                                                                             279, 743.43
Gross amount expended___________       ____----                                                                                   279,317.87

             Balance unexpended June 30, 1934_____                                                  ____--------425.                         56

                                                      6. NOYO RIVER, CALIF.

   Location.-This stream rises in the Coast Range Mountains and
flows westerly, emptying into the Pacific Ocean through Noyo
Cove, about 135 miles northwest of San Francisco. (See U. S. Coast
and Geodetic Chart No. 5703.)
   Previous projects.-Adopted by the act of September 22, 1922.
The cost under this project was $11,985.28 (not including $7,179.86
contributed funds) for new work and $32,096.55 (not including
$820.14 contributed funds) for maintenance, a total of $44,081.83.
The expenditures were $44,081.83 from United States funds and
$8,000 from contributed funds.
   Existing project.-This provides for an entrance channel 10 feet
deep and 100 feet wide and a channel in the river 10 feet deep and
150 feet wide extending to the highway bridge at Noyo, to be ob-
tained by dredging and jetty construction. All depths refer to mean
lower low water. The tidal range between mean lower low water
and mean higher high water is 5.9 feet. The extreme range is about
11.5 feet.
   The estimate of cost for new work, made in 1930, was $180,000. The
latest approved estimate for annual cost of maintenance is $10,000.
1270              REPORT                 OF CHIEF OF                      ENGINEERS, U.                              S. ARMY,            1934

  The project was adopted by the River and Harbor Act of July 3,
1930 (S. Doc. No. 156, 71st Cong., 2d sess.). The latest published
map is contained in this document.
  Local cooperation.-Complied with.
  Terminal facilities.-There are 7 wharves, 3 oil terminals for fuel-
ing fishing boats, and 1 boat-repair plant, equipped with marine rail-
way. These facilities are considered adequate for existing commerce.
   Operations and results during fiscal year.-Maintenance dredging
was begun in the channel at the mouth of the river near the end of
the year, and 3,800 cubic yards of material were removed. At the
end of the fiscal year the work was not yet completed. The cost was
$4,073.04, and the expenditures were $3,381.13.
  Condition at end of fiscal year.-The existing project was com-
pleted in 1931. At the end of the fiscal year the controlling depth
in the channel at the mouth of the river was about 6 feet; thence 9
feet to within 200 feet of the head of the project.
  The total cost of the existing project to the end of the fiscal year
was $183,684.66 for new work, and $22,325.75 for maintenance, a
total of $206,010.41. The total expenditures were $205,318.50.
  Proposed operations.-The balance unexpended July 1, 1934, will
be applied as follows:
Accounts payable, June 30, 1934 ----------------       _______
                                                        _              $691. 91
Maintenance, completion of dredging, and the removal of boulders in
  the channel at the mouth of the river, by contract, July and August
  1934     --------------------------------------------------         3, 915. 87
Balance remaining_____________________________                        3, 324. 68
             Total-------------------                                             ---------------------------                                     7, 932. 46
   The additional sum of $7,500 can be profitably expended during
the fiscal year 1936 for maintenance dredging at the mouth of the
river, by contract, from April to May 1936.
                                                           Cost and financial summary

Cost of new work to June 30, 1934-------------------------                                                                                   $195, 669. 94
Cost of maintenance to June 30, 1934                                                                                                            4, 422. 30
                                                                                                                                               5________________--__
      Total cost of permanent work to June 30, 19341-__--______                                                                               250, 092. 24
Minus accounts payable June 30, 1934                 ___-___-- __                                                                                  6__________
                                                                                                                                                  691. 91
              Net total expenditures 1-                                   -       -   -     -     -          - - -            -
                                                                                                                                   ___        249, 400. 33
Unexpehded balance June 30, 1934________________________-__                                                                                       7, 932.46

              Total amount appropriated to June 30, 1934 --------------                                                                       257, 332. 79

             Fiscal year ending June 30                                        1930                   1931             1932           1933           1934


Cost of new work_.__.-----.-  ----------
                             ___     _   __                                   _       _ .       $48, 471. 82 $127, 912. 84          .____________---.....--
Cost of maintenance__-------------------                                  $2, 444. 21           .....
                                                                                                   _____.      11, 546. 10           $6, 706. 61 $4, 073. 04

         Total cost                .......-----------------------             2, 444. 21         48, 471. 82     139, 458. 94        6, 706. 61      4, 073. 04

Total expended ...               __...------------------                      2, 504. 79         10, 308. 95     167, 036. 90       24, 591. 52      3, 381. 13

Allotted----------------------........................-------..........       3, 000. 00        190, 000. 00         20, 000. 00      -64. 20          -3. 01

  1 Not including $8,000 contributed by local interests; $7,179.86 for new work, and
$820.14 for maintenance.
      RIVERS AND        HARBORS-SAN       FRANCISCO,         CALIF.,   DISTRICT 1271

Balance unexpended July 1, 1933-------------------------      $11,316. 60
Deductions on account of revocation of allotment --------- --       3. 01

      Net amount to be accounted for ---------------------                    11, 313.59
Gross amount expended- ---   --------------------                              3, 381.13
      Balance unexpended June 30, 1934 _.___._____---.               ___--     7, 932. 46
Outstanding liabilities June 30, 1934_____-...    __-...          $658. 63
Amount covered by uncompleted contracts-----------               3, 949. 15
                                                                               4, 607. 78

       Balance available June 30, 1934_------__----------                      3, 324. 68

Amount that can be profitably expended in fiscal year ending June
                                           -          -
30, 1936, for maintenance. __________ _________                               7, 500. 00

                  7. HUMBOLDT HARBOR AND BAY, CALIF.

  Location.-Humboldt Bay is a small, land-locked harbor on the
coast of California, 225 miles north of San Francisco Bay and 70
miles south of Crescent City Harbor. (See U. S. Coast and Geodetic
Survey Chart No. 5832.)
  Previous projects.-Adopted by the River and Harbor Acts of
March 3, 1881 March 3, 1889, September 19, 1890, July 32 1892, and
March 2, 1907. The costs and expenditures on the original and
modified projects were $2,261,370.93 for new work and $98,205.75
for maintenance, a total of $2,359,576.68. For further details see
pages 1982 to 1984 of Annual Report for 1915 and page 1673 of
Annual Report for 1929.
   Existing project.-This provides for two rubble-mound jetties at
the entrance-the north jetty about 4,500 feet in length and the south
jetty 5,100 feet long, not including shore revetments; for a channel
20 feet deep and 300 feet wide from deep water in Humboldt Bay to
the foot of N Street, Eureka; a channel 20 feet deep and 250 feet
wide across Indian Island Shoal; a channel 18 feet deep and 150
feet wide to Arcata Wharf; and a channel 20 feet deep and 250
feet wide through the shoals at the entrance to Fields Landing Chan-
nel. All depths refer to mean lower low water. The tidal range
between mean lower low water and mean higher high water is 6.4
feet at the south jetty and 6.7 feet at Eureka. The extreme range is
12.5 feet at the south jetty and 12 feet at Eureka.
   The estimate of cost for new work on the jetties, revised in 1922,
was $3,200,000, and for the channels, made in 1927, $187,000, of
which $95,000 was to be contributed by local interests. These esti-
mates are exclusive of the amounts expended on previous projects.
The latest (1928) approved estimate for annual cost of maintenance
by dredging is $14,000. There is no approved estimate for main-
tenance of the jetties.
   The existing project was authorized by the following river and
harbor acts: The act of June 25, 1910, providing for rebuilding the
jetties (H. Doc. No. 950, 60th Cong., 1st sess.), and the act of July 3,
  1 Exclusive of available funds.
1272     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

1930, providing for the channels in front of Eureka, across Indian
Island Shoal, to Arcata Wharf, and at the entrance to Fields Land-
ing Channel (H. Doc. No. 755, 69th Cong., 2d sess.). The latest pub-
lished map is contained in the latter document.
   Local cooperation.-Complied with.
   Terminal facilities.-There are 40 wharves and 7 small boat land-
ings. These facilities are considered adequate for existing com-
merce.
   Operations and results during fiscal year.-The only work done
during the year was the repairing, by hired labor, of a small amount
of storm damage done to the south jetty. Two watchmen were kept
on at the north jetty plant throughout the year. The cost was
$3,724.66, all for maintenance. The expenditures were $9,068.46.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1931. The north jetty was completed in 1925, the south
jetty in 1927, and the channel dredging in 1931. The controlling
depths in the various channels in the bay and the dates on which
these depths were determined are as follows: Entrance channel be-
tween the jetties, 28 feet in 1931; channel in front of Eureka, 19
feet, October 1932; Samoa (Indian Island) Channel, 21 feet, Sep-
tember 1932; Arcata Channel, 18 feet, October 1932; Fields Landing
entrance channel, 22 feet, October 1932; Fields Landing channel,
19 feet, July 1932.
   The total cost of the existing project to the end of the fiscal year
was $2,554,856.89 for new work ($2,459,856.89 from United States
funds and $95,000 from contributed funds), and $3,263,563.03 for
maintenance (all United States funds), a total of $5,818,419.92.
The total expenditures to the same date were $5,836,906.44 ($5,741,-
906.44 from United States funds and $95,000 from contributed
funds).
   Proposed operations.-The balance unexpended July 1, 1934, will
be applied as follows:
Accounts payable, June 30, 1934__-------------------------------         $3. 47
Maintenance, repairs to the jetties with Government plant and hired
  labor, July 1934 to June 1935--------------------------- 10,000.00
Maintenance, dredging in the channels in the harbor and across the
bar, with Government plant and hired labor, September and Oc-
tober 1934     --------------------------------------------        30, 275.33

       Total      -------------------------------------------------   40, 278.80
  The additional sum of $30,000 can be profitably expended during
the fiscal year 1936 for maintenance, as follows:
Repairs to the jetties, with Government plant and hired labor, July
  1935 to June 1936---------------------------------            --- $10, 000
Redredging the channels in the harbor and across the bar, with Gov-
  ernment plant and hired labor, October 1935------------------      20, 000

       Total-----------------------------------------------              30, 000
           RIVERS AND HARBORS-SAN                               FRANCISCO, CALIF., DISTRICT1273

                                          Cost and financial summary
Cost of new work to June 30, 19341--------------------------                                            $4, 721, 227. 82
Cost of maintenance to June 30, 1934_______---------                                                     3,361, 768. 78

      Total cost of permanent work to June 30, 1934----------8, 082, 996. 60
Value of plant, materials, etc., on hand June 30, 1934           18, 489. 99      ----------
      Net total cost to June 30, 1934--------------------                                                8, 101, 486. 59
Minus accounts payable June 30, 1934 ---- ______ __ ----.                                                          3. 47

     Net total expenditures 1          -------------                                                     8, 101, 483. 12
Unexpended balance June 30, 1934_...______      _______--------40,                                               278. 80

           Total amount appropriated to June 30, 19341__-                                   _____        8,141, 761. 92

   Fiscal year ending June 30                    1930           1931           1932              1933             1934


,Cost of new work .......-------------------------.. $66, 764. 94            $17, 820. 05---------------
Cost of maintenance......------------          $29,635.24      56, 743. 21   247, 037. 92  $129, 743. 42          $3, 724. 66
      Total cost............----------------    29, 635. 24   123, 508. 15   264, 857. 97      129, 743. 42        3, 724. 66

Total expended ----------------                40, 556. 28     92, 885. 94   318, 950. 09      109, 547. 49        9, 068.46

Allotted----------------------60,                  000. 00    293, 000. 00    70, 600. 00      112, 639. 12         507. 80
                                                                                                                  31,

Balance unexpended July 1, 1933_----_---__------------------   $17,839.46
Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934___ ------------------------------------------    32, 100. 00
      Amount to be accounted for_ -____---.    _____------                                                     49, 939. 46
Deductions on account of revocation of allotment----------------                                                   592. 20
      Net amount to be accounted for____-__________----
                                                    -__                                                        49, 347. 26
Gross amount expended _________________--               $12, 478. 01
Less reimbursements collected----------------------3, 409. 55
                                                                                                                9, 068. 46

       Balance unexpended June 30, 1934________________------                                                 40, 278. 80
-Outstanding liabilities June 30, 1934 ___________________________                                                 59. 65
           Balance available June 30, 1934------------------------40,                                             219. 15

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 2__    ______,____30,                                                                  000. 00
    8. EXAMINATIONS, SURVEYS, AND CONTINGENCIES (GENERAL)
   The cost of work during the year amounted to $18,008.59; the
,expenditures were $17,952.28. The funds unexpended June 30, 1934,
amounting to $25,132.92, will be applied as needed during the fiscal
year 1935 to payment of expenses incurred in connection with the
above items. The additional sum of $25,000 can be profitably ex-
pended during the fiscal year 1936.
                                           Cost and financial summary
,Cost of maintenance to June 30, 1934-----------------------                                                  $62, 060. 87
Minus accounts payable June 30, 1934----------------------                                                         401.53

      Net total expenditures----------------------------                                                      61, 659. 34
Unexpended balance June 30, 1934--------------------------                                                    25, 132.92

           Total amount appropriated to June 30, 1934---                                                       86, 792. 26
       addition, $95,000 was expended from contributed funds.
    SIn,
    Exclusive of available funds.
1274            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                                    1934


           Fiscal year ending June 30                              1930                 1931            1932               1933          1934

Cost of new work - ---                - - -        - - - -                                           - - -           - - -             -- -
Cost of maintenance-.------------------- $8, 791. 03 $14, 001. 99                                    $10, 741. 93    $7, 682. 62       $18, 008. 59
Total expended--.-----------------------..                       8, 568. 28        13, 441.85         11, 212.87        7, 686.04       17, 952. 28
Allotted........-----......---- --------------------             8, 000. 00        13, 500. 00         6, 000. 00     32, 515.41        16, 576. 85


Balance unexpended July 1, 1933---------------------------        $26, 508.35
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934--------------------      $21, 500. 00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933----------------------       8,917. 43
                                                                   30, 417. 43:

      Amount to be accounted for---__----....__               __-__- 56, 925. 78
Deductions on account of revocation of allotment___---_--_---    _   13, 840. 58

      Net amount to be accounted for--------------------         43, 085. 2&
Gross amount expended ----- __- ____--        ____  $18, 048.60
Less reimbursements collected----------------------       96. 32
                                                                 17, 952. 28

      Balance unexpended June 30, 1934------ ---   ----------                                                                        25, 132.92
Outstanding liabilities June 30, 1934 ________---------------                                                                            401. 53

            Balance available June 30, 1934________                                                      _______- -                  24, 731.391

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance      -------------------------------                                                                      25, 000. 00

                       9. Other projects for which no estimates are submitted
                             [Commercial statistics for these projects are given in pt. 2 of report]

                                                                             For last          Cost and expenditures to
                                                                             full re-                June 30, 1934                   Estimated
                         Name of project                                     port see                                                amount re-
                                                                             annual                                                   quired to
                                                                              report           New work         Maintenance           complete
                                                                               for-

Redwood Creek Calif.1 --------..                    _---------------_            1933          2$67, 763.46          $7,   023. 41       (to)
Napa River, Calif.___ 4      - - - - -..---------------------------
                                        -- - - - - - - - - - - - - - - - -   -   1930            27, 555. 55         34,   595. 68         $78, 500
Petaluma Creek, Calif. _..                                                       1933          5 297, 145. 52       314,   692. 30       (10)
                             -
San Rafael Creek, Calif 8- ....           ..     --     -- --- ..                1933           732, 358. 85        139,   747. 10       (10)
Crescent City Harbor, Calif.8.---------------------                              1933          9690, 611. 34        191,   941..47       (10)


  1 Inactive pending action by Congress on modifications recommended by the Chief of Engineers, May 25,
1933 (Rivers and Harbors Committee Doc. No. 10, 73d Cong., 1st sess.).
  2 In addition, $26,000 was expended from contributed funds.
  8 Inactive pending action by Congress on modifications recommended by the Chief of Engineers, Dec. 8,
1931 (Rivers and Harbors Committee Doc. No. 6, 72d Cong., 1st sess.).
  4 Channel adequate for commerce. Expended during fiscal year for outstanding liabilities, $348.
  5 In addition, $15,558.55 was expended from contributed funds.
  6 Channel adequate for commerce.
  7 In addition, $41,093.81 was expended from contributed funds.
  8 No maintenance necessary. Expended for miscellaneous work during fiscal year $76.74.
  9 In addition, $245,000 was expended from contributed funds, $217,115.54 for new work and $27,884.46 for
maintenance.
   toCompleted.

    1 Exclusive of available funds.
           RIVERS AND HARBORS-SACRAMENTO,                                         CALIF., DISTRICT         1275
Status of reports called for by river and                      harbor acts and committee resolutions

             Locality                        Authorization act                Transmitted    Docu-     Recommen-
                                                                              to Congress   ment no.     dation
                                   i                                      i




Albany Harbor, Calif...._____..        River and Harbor            Act,
                                        July 3, 1930.
Berkeley Harbor, Calif ______...       -_   d o ..   -.........----------
Crescent City Harbor, Calif-....   Rivers and Harbors Com-
                                     mittee resolution, June 14,
                                     1933.
Emeryville Harbor, Calif -....     River and Harbor Act, July
                                     3, 1930.
Humboldt Harbor and Bay, Senate Committee resolu- July           1933        Unfavorable.
  Calif.                             tion, Dec. 24, 1929.
Humboldt Bay and Harbor, Rivers and Harbors Com-
  Calif., improvements of Ar-        mittee resolution, Jan. 7,
  cata Channel.                      1932.
Humboldt Bay and Harbor, Rivers and Harbors Com-
  Calif., improvement of inner       mittee resolution, Dec. 9,
  channel.                           1932.
Humboldt Harbor and Bay, Rivers and Harbors Com-
  Calif., modification of existing   mittee resolution, Sept.
  project.                           15, 1933.
Oakland Harbor, Celif_..... __ Rivers and Harbors Com-
                                     mittee resolution, Aug. 18,
                                     1933.
Petaluma Creek, Calif........__ Rivers and Harbors Com-
                                     mittee resolution, Mar.
                                     15, 1934.
Richmond Harbor, Calif__--.....    Rivers and Harbors Com-
                                     mittee resolution, Apr. 3,
                                     1934.
Santa Cruz Harbor, Calif., and Rivers and Harbors Com-
  Port Watsonville, Calif.           mittee resolution, Feb. 7,
                                     193-i.
Trinidad Bay, Calf............. River and Harbor Act Aug. 10,1933 __________     Do.
                                     July 3, 1930.


IMPROVEMENT OF RIVERS AND HARBORS                                                                      IN THE
        SACRAMENTO, CALIF., DISTRICT
   This district embraces the drainage basins of Suisun Bay, the Sac-
ramento and San Joaquin Rivers and their tributaries, and those
parts of southern Oregon and of northwestern Nevada which con-
stitute that portion of the Great Basin that tends to drain toward
central Nevada.
   District engineer: Capt. J. G. Drinkwater, Corps of Engineers.
   Division engineer: Lt. Col. Thomas M. Robins, Corps of Engineers.
                                                     IMPROVEMENTS

                                                       Page                                                   Page
1. San Joaquin River, Calif____                       1276      6. Middle River and Empire
2. Stockton and Mormon Chan-                                         Cut, Calif______________                1290
     nels (diverting    canal),                                 7. Suisun Bay Channel, Calif__               1292
      Calif _-__-                                     1282      8. Suisun Channel, Calif ___ __              1294
3. Mokelumne River, Calif__.                          1284      9. Examinations, surveys, and
4. Sacramento River, Calif __                         1286           contingencies (general) ___             1295
5. Feather River, Calif_____ .                        1289




                                                                                                                     t   ;r   "N~
1276          REPORT OF          CHIEF OF ENGINEERS,               U.    S.    ARMY,       1934

                                 1. SAN JOAQUIN RIVER, CALIF.

   Location.--San Joaquin River rises in the Sierra Nevada and flows
320 miles westerly and northerly to Suisun Bay.
   Existing project.-This provides for a channel 26 feet deep at
mean lower low water and 100 feet wide on the bottom, except in
New York Slough, where the width is to be 300 feet, following the
river route, from the mouth of New York Slough to the city of
Stockton, a distance of 41.5 miles, via New York Slough, San Joaquin
River, and Stockton Channel, with levees set back 230 feet from the
center of the channel, and having suitable passing places with a
turning basin at Stockton; for dredging in Mormon Channel from its
mouth to Center Street, Stockton, a distance of 1.7 miles, to a depth
of 9 feet at mean lower low water and a width of 100 feet; for a
depth of 9 feet in Fremont Channel and McLeod Lake; for cutting
off sharp bends and making cut-offs in the river; for partial closing
of side channels at Lairds Slough and Paradise Cut by weirs to con-
fine the low-water flow to one main channel; and for snagging, re-
moving overhanging trees, and constructing brush wing dams from
the mouth of Stockton Channel to Hills Ferry, 86 miles, to facilitate
light-draft navigation on this part of the river during higher stages
of water. All depths are referred to mean lower low water. The
following table shows the tide and flood conditions prevailing:
                                         San Joaquin River

                                                         Miles                    Range in feet
                                                         from
                         Place                          mouth
                                                           of      Mean        Extreme    Ordinary Extreme
                                                         river     tidal '      tidal      flood    flood


Collinsville_--  _---------------------------------         0           5. 8       7. 0       8. 0      9. 9
Mouth, Stockton Channel------------------------            38.5         3. 2       4. 5       8. 5     13. 7
San Joaquin Bridge..-----------------------------          54. 5        1. 1       1. 5      17.       21. 0
Hills Ferry    .--.....----------------------------------- 124. 5--------------------        12. 0     16.

   Mean lower low water to mean higher high water.

  The estimate of cost for new work, revised in 1927, is $4,046,400.
This amount includes $1,100,000 for the construction of two dredges
and also $1,307,500 contributed by local interests toward the cost
of dredging. The latest (1927) approved estimateof annual cost of
maintenance is $181,000 during the first year and $111,000 annually
thereafter.
  The existing project was authorized by the following river and
harbor acts: The acts of August 14, 1876; March 3, 1881; July 5,.
1884; August 11, 1888; July 13, 1892; August 18, 1894; and June 3,
1896, provided for cutting off sharp bends and making cut-offs in
San Joaquin River below the mouth of Stockton Channel, dredging:
Mormon Channel, snagging, removing obstructions, and construct-
ing wing dams in San Joaquin River from Stockton Channel to Hills
Ferry, and the partial closing of side channel at Laird Slough and
Paradise Cut, without adopting any specific dimensions; the act of
June 25, 1910, provided for the 9-foot channel up to Stockton
(H. Doc. No. 1124, 60th Cong., 2d sess.); the act of July 25, 1912,
provided for the improvement of Fremont Channel and McLeod
        RIVERS AND HARBORS-SACRAMENTO,         CALIF., DISTRICT   1277
Lake (H. Doc. No. 581, 62d Cong., 2d sess.); and the act approved
January 21, 1927, provided for the 26-foot project (H. Doc. No. 554,
68th Cong., 2d sess.). The latest published maps are in House
Documents No. 332, Sixty-fifth Congress, first session, and No. 554.
Sixty-eighth Congress, second session.
    Supplementing the work authorized by Congress, the deepening
of the 26-foot channel in San Joaquin River and Stockton Channel
to 30 feet at mean lower low water, and for channel bottom widths
of 150 feet above Criminal Point (Venice Island), and 300 feet
below Criminal Point, as recommended by the Chief of Engineers
under date of June 10, 1933 (Senate Committee print, 73d Cong.,
  1st sess.), is included in the Public Works program under the
National Industrial Recovery Act.
    Reconmmended modifications of project.-Included in Public Works
program.
    Local cooperation.-The work included in the Public Works pro-
gram is subject to the condition that local interests shall furnish
free of cost to the United States, suitable areas for the disposal of
dredged material during initial construction and future maintenance
as and when needed.
    Conditions of local cooperation required under prior acts have
been fully complied with, except that rights-of-way for deepening
and widening Mormon Channel have not been furnished.
    Terminal facilities.-In New York Slough there are 13 wharves;
1 is for deep-sea vessels and the remainder for river boats and fish
boats; 1 has spur track; 2 have oil pipe lines. The city of Stock-
ton port terminal is provided with rail service over a public belt
railroad.
    There are seven privately owned warehouses on the river between
Stockton Channel and the mouth of Old River, and one warehouse
just above Santa Rita Slough. On the river below Stockton Chan-
nel, landings and sheds are used to handle traffic, except at Antioch
and below, where extensive wharves and warehouses exist. In the
delta country on both sides many warehouses have been constructed
to store commodities later shipped on the main river. The terminal
facilities are considered adequate for existing commerce.
    Operations and results during fiscal year.-Project authorized by
the Federal Emergency Administration of Public Works.
    New work during the year consisted in widening and deepening
the channel to provide a 30-foot channel to Stockton, Calif. Suc-
tion dredges, undei contract, removed 8,275,415 cubic yards from
the 30-foot project channel at a cost of $1,013,861.77. Surveys cost
 $1,213.70.
    Existing project-Maintenance.-A Government suction dredge
removed 38,640 cubic yards in dredging a channel 150 feet wide and
10 feet deep from Roe Island Lighthouse to deep water and 168,740
'cubic yards in dredging Fisthermans Channel 150 feet wide and 10
feet deep, at a cost of $10,798.03. Hired labor planted Holland
grass on 30 acres of spoil area at a cost of $1,568.70. Dredges, under
contract, placed 71,767 cubic yards in spoil levees and removed
711,000 cubic yards from the 26-foot Stockton Channel, at a cost
of $83,561.96. Grading levees by United States plant and hired
labor, cost $739.09; and surveys and maintenance of tide gages cost
 $7,514.09.
1278    REPORT OF CHIEF OF ENGINEERS,            U.   S, ARMY,   1934

  Under authority of section 3 of the River and Harbor Act
approved July 3, 1930, a clam-shell dredge, under contract, removed
shoals from the following waterways, for maintenance, at a cost of:
Salmon Slough, Calif., 7,760 cubic yards------------------------$951. 60
Old River, Calif., 8,160 cubic yards---  -------------------------- 946.48
Tom Paine Slough, Calif., 7,960 cubic yards----------------------944.94
Doughty Cut, Calif., 3,980 cubic yards---------------------------498.01
King Island Cut, Calif., 5,280 cubic yards------------------------744. 67
Grant Line Canal, Calif., 5,980 cubic yards-----------------------749. 74
   The total costs for the year were $1,126,764.40, of which $2,671.62
from regular funds and $1,015,075.47 from Public Works funds were
for new work and $109,017.31 was for maintenance. Total expendi-
tures were $1,084,357.61, including $977,246.81 from Public Works
funds.
   Condition at end of fiscal year.-The existing project is 84 percent
completed, the work remaining being the dredging of a 9-foot chan-
nel in Mormon Channel to Center Street, Stockton. Completion of
the portion of this project affected by operations authorized by the
Federal Emergency Administration of Public Works is now under
way. The controlling depth from Suisun Bay to Stockton, via New
York Slough, San Joaquin River, and Stockton Channel, 41 miles,
is 26 feet. A 4-foot depth is available in Mormon Channel. The
controlling depth in Fremont Channel and McLeod Lake is 8 feet.
   The river from the mouth of Stockton Channel up to Hills Ferry
usually has a controlling depth of 6 feet from April to June,
inclusive. Navigation in this section above San Joaquin Bridge
 (Southern Pacific Railroad crossing) is impracticable in the low
stages after June.
   The costs have been as follows:
Regular funds:
    New work---------------------------------------              $1, 971, 221. 89
    Maintenance---------------------------------                     889, 733. 58
Public Works funds: New work--------------------------            1, 015, 075.47

       Total United States funds    --------------------------    3, 876, 030. 94
   The total expenditures were $3,841,290.30, including $977,246.81
from Public Works funds. In addition, $1,307,500 was expended
from contributed funds.
  Proposed operations.-The balance unexpended at the end of the
year, amounting to $92,277.49, including accounts receivable, $2,-
497.94, will be applied as follows:
Accounts payable, June 30, 1934___-----------------------------       $6, 385. 09
Maintenance:
    Dredging 9Lfoot channel in Stockton Channel above
      Edison Street, in Fremont Channel and McLeod
      Lake, at Stockton, by clamshell dredge under con-
      tract, in September or October 1934----------- $4, 000. 00
    Dredging 30-foot channel in Stockton Channel below
      mouth of Mormon Channel, and in San Joaquin
      River below the mouth of Stockton Channel, at va-
      rious bars and shoals, total distance 41 miles,
      by U. S. hydraulic dredge Sacramento, and hired
      labor, August and September 1934 and April
      195-----------------------------------            46, 000. 00
         RIVERS AND HARBORS--SACRAMENTO,                          CALIF., DISTRICT   1279
Maintenance--Continued.
   Dredging various shoals in 30-foot channel to Stock-
      ton by Government hopper dredge and hired labor,
      January and February 1935-----------------                $15, 000. 00
   Dredging shoals in main river above mouth of
       Stockton Channel at various locations up to
       Southern Pacific Co. Lathrop Bridge, 16 miles,
      by clamshell dredge under contract, November
      1934        .      __------------------------------------   5, 000. 00
    Snagging in main river, above and below mouth of
       Stockton Channel, by Government plant and
      hired labor, July to October 1934, and in June
       1935__ _-----------------                                 11, 000.00.
    Dredging in tributary channels by clamshell dredge,
       under contract, May and June 1935-----------                4, 892. 40
          Total for maintenance __----_____--------____                         $85, 892. 40
          Total ---     -------------------------------------                    92, 277. 49
  The balance unexpended at the end of the year from National
Industrial Recovery Act funds, amounting to $169,101.18, together
with an additional allotment of $12,000 received in July 1934, will
be applied to payment of accounts payable as of June 30, 1934,
$36,008.56, and to new work as follows: Completing the dredging of
the 30-foot channel in Stockton Channel and San Joaquin River,
from Stockton to a point 8 miles downstream (pt. I), under an exist-
ing contract, from July to September 1934, at a cost of $117,500;
and to completing the 30-foot channel in Suisun Bay Channel, at
Bulls Head Point, by the U. S. hopper dredge San Pablo, at a cost
of $27,692.62.
   The additional sum of $80,000 can be profitably expended during
the fiscal year 1936, as follows:
Maintenance:
   Dredging 9-foot channel in Stockton Channel above Edison Street,
      Stockton, and in Mormon Channel, Fremont Channel, and McLeod
      Lake at Stockton, by clamshell dredge under contract, August to
      November 1935 ---          ------------------    -----------------  $3, 500
   Dredging 30-foot channel in Stockton Channel below mouth of Mor-
      mon Channel, and in San Joaquin River below the mouth of
      Stockton Channel and in New York Slough, at various bars and
      shoals, total distance 41 miles; by United States hydraulic dredge,
      and hired labor, August to October 1935----       _______-____----  47, 000
   Dredging various shoals in 30-foot channel to Stockton by Govern-
      ment hopper dredge and hired labor, January and February 1936_ 15, 000
   Dredging shoals in main river above mouth of Stockton Channel, at
      various locations up to Southern Pacific Co. Lathrop Bridge, 16
      miles, by clamshell dredge under contract, October or November
      1935 -------------------------------------------------               3, 000
    Snagging in main river, above and below mouth of Stockton Chan-
      nel, by Government plant and hired labor, as required----------3, 500
   Dredging in tributary channels by clamshell dredge under contract,
      July and August 1935, and June 1936_-----------------------          5, 000
   Resurveys of channels and levees, and miscellaneous inspections,
      by Government plant and hired labor, July 1935 to April 1936...      3, 000

        Total-------------         -----------------------------------               80, 000




       91536--ENG 1934-81
1280         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                     1934

                                        Cost and financial summary
                              MAINTENANCE                AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934--------------                                                            $1, 971, 221. 89
Cost of maintenance to June 30, 1934 -------------------------                                               1889, 733. 58

      Total cost of permanent work to June 30, 1934---------- 2, 860, 955. 47
Value of plant, materials, etc., on hand June 30, 1934             6, 975. 17              --------
      Net total cost to June 30, 1934--------------------- 2, 867, 930'. 64
Plus accounts receivable June 30, 1934------------------------  2, 497. 94

     Gross total costs to June 30, 1934--------------------                                                 2, 870, 428. 58
Minus accounts payable June 30, 1934                                                                                385. 09
                                                                                                                 6------------------------,
     Net total expenditures-----------------------------2,                                                       864, 043. 49
Unexpended balance June 30, 1934------------------------                                                          89, 779. 55

            Total amount appropriated to June 30, 1934,-----------                                          2, 953, 823.04

   Fiscal year ending June 30                  1930              1931               1932            1933             1934


Cost of new work__-      ---                $55, 055. 85      $648, 899. 42   $509, 536. 08      $287, 135. 09        $2, 671. 62
Cost of maintenance---------         ---      3, 331. 06         6, 766. 93     17, 293. 52        64, 140. 66       109, 017. 31
        Total cost__-------------             58, 386. 91      655, 666. 35       526, 829. 60    351, 275. 75       111, 688. 93
Total expended...              ..----------------.
                                                29, 579. 74    421, 059. 57       679, 436. 73    466, 547. 30       107, 110. 80
Allotted.      -_ --------------
                             _--_           248, 000. 00       236, 000. 00       145, 000. 00    575, 887. 74       84, 133. 30


Balance unexpended July 1, 1933---------------------------$112,                                                       757. 05
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934-----------------    --- $80, 000. 00
Amount allotted from War Department Appropriation
  Act approved July 14, 1932---------------------- 6, 347. 55
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933-    -------------------- 34, 600. 00
                                                                                                                 120, 947. 55
     Amount to be accounted for--------------------------233,                                                         704. 60
Deductions on account of:
   Revocation of impounded balances--------------$3, 709. 65
   Revocation of allotments---------------------33, 104. 60
                                                                                                                  36, 814. 25
      Net amount to be accounted for ---------------------                                                       196, 890. 35
Gross amount expended------------------------        $124,270.41
Less:
    Reimbursements collected----------  $16, 857. 94
    Receipts from sales------------------    301. 67
                                                       17, 159. 61
                                                                                                                 107, 110. 80
      Balance unexpended June 30, 1934-----------------_                                                          89, 779. 55
Outstanding liabilities June 30, 1.934- -     -    $2, 561. 12
Amount covered by uncompleted contracts .. ___-...  3, 823. 97
                                                                                           6, 385. 09
        Balance available June 30, 1934__                                     -
                                                                      ___ ____._-_        83, 394. 46
Accounts receivable June 30, 1934_______________                                          2, 497. 94
        Unobligated balance available June 30, 1934--------------85. 892. 40
Amount (estimated) required to be appropriated for completion of
                        -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- -
  existing project                                                                       112. 000. 00
Amount that can be profitably expended in fiscal year ending June
   30, 1936, for maintenance 2-        -   - -          -                   -___          80, 000. 00
    1   In addition, $1,307,500 was expended from contributed funds.
    SExclusive of available funds.
              RIVERS AND HARBORS-SACRAMENTO,                                           CALIF., DISTRICT                   1281
                                               PUBLIC       WORKS FUNDS

Cost of new work to June 30, 1934__ ____--________         $1, 015, 075. 47
Cost of maintenance to June 30, 1934-                 ----------
                                            --------------
       Total cost of permanent work to June 30, 1934--------_                                                  1,015, 075. 47
Value of plant, materials, etc., on hand June 30, 1934--.....                                                   --1, 820. 10
     Net total cost to June 30, 1934_                                                                          1, 013,255. 37
Minus accounts payable June 30, 1934_______________________                                                        36, 008. 56

                                                                                                                    977, 246. 81
Unexpended balance June 30, 1934___________________________                                                        169, 101. 18
             Total amount appropriated to June 30, 1934- __________                                            1, 146, 347.99

    Fiscal year ending June 30                 1930              1931                1932           1933                1934


Cost of new work----------------                          ---------------------------------------                   $1,015,075.47
Cost of maintenance--------------------                     ------         ---------        ---------------------

Total expended---------             ----------------------------------------------                         -           977, 246. 81
Allotted.-       ..--------------------    -              ------------------------------------------                 1, 146, 347. 99


Amount allotted from National Industrial Recovery Act approved
  June 16, 1933--      ----------------------------------- $1, 146, 347.99
Gross amount expended----------------------$977, 257.76
Less:
    Reimbursements collected __________-$4. 45
    Receipts from sales....                   6. 50
                                                         10.95
                                                               977, 246. 81
      Balance unexpended June 30, 1934 ________________                                                          169, 101. 18
Outstanding liabilities June 30, 1934___._______ $2, 987. 82
Amount covered by uncompleted contracts-------- 151, 695. 24
                                                                                                                 154, 683. 06

         Balance available June 30, 1934-----------------                                                           14, 418. 12

         CONSOLIDATED COST AND FINANCIAL SUMMARY FOR SAN JOAQUIN RIVER

Cost of new work to June 30, 1934________-- ___---- ----                                             _1 $2, 986, 297. 36
Cost of maintenance to June 30, 1934_ ____________-----                                        --               889, 733. 58

      Total cost of permanent work to June 30, 1934----------3, 876, 030. 94
Value of plant, materials, etc., on hand June 30, 1934-_______- - 5, 155. 07

      Net total cost to June 30, 1934______________________                                                3,881, 186. 01
Plus accounts receivable June 30, 1934________________
                                          ----                                                                 2, 497. 94

     Gross total costs to June 30, 1934____________________                                                3, 883, 683. 95
Minus accounts payable June 30, 1934 _____________________                                                     42, 393. 65

     Net total expenditures   -------------- -------------                                                 3, 841, 290. 30
                               --------------------------
Unexpended balance June 30, 1934_                                                                             258, 880. 73

        Total amount appropriated to June 30, 1934__------------                                           4, 100, 171. 03

  3 In addition, $1,307,500 was expended from contributed funds.
1282          REPORT             OF      CHIEF          OF      ENGINEERS,           U.      S.   ARMY,       1934



   Fiscal year ending June 30                        1930              1931               1932         1933               1934


Cost of new work-............                  .   $55, 055. 85     $648, 899.42    $509, 536. 08   $287, 135. 09    $1, 017, 747.09
Cost of maintenance ..------             _           3, 331. 06        6, 766. 93     17, 293. 52     64, 140. 66        109, 017. 31
       Total cost...........----------------        58, 386. 91      655, 666. 35    526, 829. 60    351, 275. 75     1, 126, 764. 40
Total expended..                   ...----------------29, 579. 74    421, 059. 57    679, 436. 73    466, 547. 30     1, 084, 357. 61
Allotted--- ------.---------.--           _248,         000. 00      236, 000. 00    145, 000. 00    575, 887. 74     1, 230, 481. 29


Balance unexpended July 1, 1933_____________                                                                        $112, 757.05
Amount allotted from War Department Appropria-
  tion Act approved Apr. 26, 1934 _____________       $80, 000. 00
Amount allotted from War Department Appropria-
  tion Act approved July 14, 1932                       6, 347. 55
Amount allotted from War Department Appropria-
  tion Act approved Mar. 4, 1933 ------------   __     34, 600. 00
Amount allotted from National Industrial Act ap-
  proved June 16, 1933-_----    --        --
                                       ____      __ 1,146, 347. 99
                                                                                                               1, 267, 295. 54

     Amount to be accounted for-------   -----------------    1, 380, 052. 59
Deductions on account of:
   Revocation of impounded balances------------- $3, 709. 65
    Revocation of allotments-------------------   33, 104. 60
                                                                  36, 814. 25
      Net amount to be accounted for---------------------1,                                                          343, 238.34
Gross amount expended--------------------- $1,101, 528.17
Less:
    Reimbursements collected--------$16, 862. 39
    Receipts from sales----------------  308. 17
                                                   17, 170. 56
                                                                                                               1, 084, 357. 61

      Balance unexpended June 30, 1934---------------------258, 880. 73
Outstanding liabilities June 30, 1934-------------  $5, 548.94
Amount covered by uncompleted contracts ------     155, 519. 21
                                                                161, 068. 15

      Balance available June 30, 1934 ------------------------                                                        97, 812. 58
Accounts receivable June 30, 1934----------------------------                                                          2,497. 94

           Unobligated balance available June 30, 1934- --------                                      ___            1001, 310. 52

Amount (estimated) required to be appropriated for completion
of existing project 1------------------------------------  -                                                        112, 000. 00

Amount that can be profitably expended            in fiscal year ending June
                             1- - - -- - - - - - - - - - - - -- ----- ----
30, 1936, for maintenance                                                 ---                                        80, 000. 00

2. STOCKTON AND MORMON CHANNELS (DIVERTING CANAL), CALIF.

  Location.-This is an artificial cut located about 2 miles northeast
of Stockton. (See U. S. Geological Survey Sheet " Stockton quad-
rangle.")
  Existing project.--This provides for diverting the waters of Mor-
mon Slough before reaching Mormon and Stockton Channels by
means of a dam in the slough 3 miles east of Stockton, and a canal
150 feet wide, with average cut of 7.9 feet, thence to the north branch
of the Calaveras River, 4.63 miles; by the enlargement of the cross
   1
       Exclusive of available funds.
        RIVERS AND HARBORS-SACRAMENTO,               CALIF., DISTRICT    1283
section of this branch to 1,550 square feet, thence to its mouth at the
San Joaquin River, 5 miles; and by the construction of a levee along
the west side of the canal and the south side of the north branch of
the Calaveras River from the material excavated. The height of the
levee is limited by necessary railway and highway crossings to about
3 feet above the contemplated flood surface. The canal is empty
during the greater part of the year, but at times of extreme flood
there is a depth of about 12 feet, and at ordinary flood a depth of
about 10 feet. The estimate of cost for new work, revised in 1906,
was $280,395. The latest (1918) approved estimate for annual cost
of maintenance is $5,000.
   The existing project was authorized by the River and Harbor Act
of June, 13, 1902 (H. Doc. No. 152, 55th Cong., 3d sess., and Annual
Report for 1899, p. 3188). The latest published map is in House
Document No. 256, Sixty-third Congress, first session.
   Local cooperation.-Complied with.
   Terminal facilities.-See report on San Joaquin River, Calif.
   Operations and results during fiscal year.-Brush and trees were
cleared from 3.6 acres of the canal by hired labor at a cost of $181.75.
Surveys and inspections cost $717.79. Total costs were $899.54, for
maintenance. The expenditures were $959.05.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1910 at a saving of $27,244 under the estimated cost. Most
of the silt formerly deposited in Stockton and Mormon Channels is
diverted therefrom by this canal, thereby obviating serious inconven-
iences to navigation and the expensive annual dredging formerly
necessary in these channels. Total cost and expenditure were $338,-
027.71, of which $253,151.03 was for new work and $84,876.68 for
maintenance.
   Proposed operations.-The balance unexpended at the end of the
year, amounting to $5,196.36, will be applied to maintenance as
follows:
Removal of brush, overhanging trees, and other obstructions from the
  channel and banks of both sections of the diverting canal, by Gov-
  ernment plant and hired labor, April and May 1935---------------$3, 000.00
Dredging deposits of silt from the Calaveras section of the diverting
  canal, by contract, July 1934----------------------------------- 2,196. 36

      Total ----------------------------------------------            5,196. 36
  The additional sum of $2,000 can be profitably expended during
the fiscal year 1936 for maintenance in removal of brush, overhang-
ing trees, and other obstructions from the channel and banks of both
sections of the diverting canal, by Government plan and hired labor,
April and May 1936.
                          Cost and financial siummary
                                 -----------------------------
Cost of new work to June 30, 1934__                             $253, 151. 03
Cost of maintenance to June 30, 1934----------------------------84, 876. 68
      Total cost of permanent work to June 30, 1934------------     338, 027. 71

Net total expenditures_------------_                                338, 027. 71
Unexpended balance June 30, 1934        --------                      5, 196. 36

      Total amount appropriated to June 30, 1934_       -    -___   343, 224. 07
1284       REPORT OF        CHIEF OF ENGINEERS,                              U.    S.   ARMY,        1934


       Fiscal year ending June 30            1930                     1931           1932          1933                1934


Cost of new work-.................
Cost of maintenance-------------------     $4, 907. 91         $3, 222. 93         $2, 988. 70   $6, 704.01              $899, 54
Total expended-----------------------       5, 174. 34          2, 417. 03          3, 148. 90    7, 328. 02             959. 05
Allotted-----------------------------       5, 000. 00          4, 500. 00        ---             4, 425. 34           4, 703. 73


Balance unexpended July 1, 1933-------------------------------- $1,451.68
Amount allotted from War Department Appropriation Act approved
  Apr. 2;6, 1934------------------------------------------       5, 000. 00

      Amount to be accounted for________________---___------                                                        6, 451. 68
Deductions on account of:
    Revocation of impounded balances_--_----- --- _          $44.59
    Revocation of allotment------    -------------------- 251. 68
                                                                                                                      296. 27

      Net amount to be accounted for------------------------                                                        6, 155. 41
Gross amount expended                                                                                                   59. 05
                                                                                                                       9-----------------------
        Balance unexpended June 30, 1934------------------------                                                    5, 196. 36

Amount that can be profitably expended in fiscal year ending June 30,
1936, for maintenance _______----________________ -             ___                                                2, 000. 00

                           3. MOKELUMNE RIVER, CALIF.

   Location.-This river rises near the crest of the Sierra Nevada
and empties into the San Joaquin River 20 miles above the mouth of
the latter. (See U. S. Geological Survey " Topographic Map of the
Sacramento Valley, Calif.")
  Existing project.-This provides for the removal of snags and
obstructions and occasional dredging of shoals from the mouth of
the river to Galt-New Hope Bridge, a distance of 35 miles, including
both forks. The mean lower low-water depths considered sufficient
for needs of navigation are as follows:
                                       Moklelumne River

                       Location of section going upstream                                            Depth            Length


                                                                                                       Feet            Miles
Mouth of river to lower junction North and South Forks___
                                                       -----                                                   11              4
Lower junction North and South Forks to Snodgrass Slough via North Fork -----                                   9              8
Snodgrass Slough to upper junction North and South Forks via North Fork-.......                                 4              1
Lower junction North and South Forks to upper junction of same at New Hope
Landing via South Fork_                                                                                        9             14
New Hope Landing to Galt-New Hope Bridge ---             ----------                                             3              8



  At low-river stages the range between mean lower low water and
mean higher high water at the mouth is 4 feet, with extreme tidal
range of 5 feet; there is no tide at the upper end, just above Galt-
New Hope Bridge. Ordinarily flood fluctuation is 5.5 feet at the
mouth and 12 feet at the upper end. Extreme flood fluctuation is 8
feet at the mouth and 17 feet at the upper end. The estimate of cost
for new work, made in 1881, was $8,250. The latest (1930) approved
estimate for annual cost of maintenance is $2,000.
   The exist:ng project was adopted by the River and Harbor Act of
July 5, 1884 (Annual Report for 1882, p. 2637). For latest pub-
  1Exclusive of available funds.
            RIVERS AND HARBORS-SACRAMENTO,                             CALIF., DISTRICT                    1285
lished map see House Document No, 1160, Sixty-third Congress,
second session.
   Terminal facilities.-The Western Pacific Railroad has a ware-
house at Terminous, on Potato Slough; otherwise commodities are
handled on landings or directly on the banks at various points. The
facilities are considered adequate for existing commerce.
   Operations and results during fiscal year.-Government plant and
hired labor removed 49 stumps and 335 overhanging trees from the
river channel and banks at a cost and expenditure of $9,927.80 for
maintenance.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1885. Controlling depths are as shown in the table under
" Existing project ", except in the third section, where 3 feet is the
controlling depth. The channel is reasonably free of obstructions
to the head of navigation, except for a few that usually develop at
low-water stages in the fall. Total cost and expenditures were
$64,525.36, of which $8,500 was for new work and $56,025.36 for
maintenance.
   Proposed operations.-The balance unexpended at the end of the
year, amounting to $2,011.96 will be applied to maintenance, dredg-
ing of sand bars and shoals by contract, in August 1934.
   The additional sum of $1,000 can be profitably expended during
the fiscal year 1936, for maintenance, removing snags, overhanging
trees, and other obstructions, by Government plant and hired labor.
                                   Cost and financial summary
Cost of new work to June 30, 1934                                $8, 500. 00
Cost of maintenance to June 30, 1934----------------------------56, 025. 36
          Total cost of permanent work to June 30, 1934-------------- 64, 525. 36

Net total expenditures -----------------------------------------                                        4, 525. 36
Unexpended balance June 30, 1934__                                                                      2, 011.96

          Total amount appropriated to June 30, 1934--------------                                     66, 537. 32

         Fiscal year ending June 30             1930         1931          1932            1933            1934


Cost of new work-------------------------------------------------
Cost of maintenance ...----..------------------- $3, 030. 77 $4, 905.
                                                                    59 ------- _--       $1, 637. 56        927.80
                                                                                                          $9,
Total expended---------------------------      9, 369. 25   4,905. 59 ------------ 1,637. 56               9, 927. 80
Allotted -----------------------------         3,000. 00    3, 700. 00 --------   ----    1,998. 32       11, 579. 00

Balance unexpended July 1, 1933------------------------------$360. 76
Amount allotted from War Department Appropriation Act
  approved Apr. 26, 1934--------------------------------$2,    000. 00
Amount allotted from War Department Appropriation Act
  approved July 14, 1932---------------------               9, 639. 24
                                                                       11, 639. 24
      Amount to be accounted for      ---------------------------- 12, 000.00
Deductions on account of revocation of impounded balances---------          60. 24
      Net amount to be accounted for-------------                      11, 939. 76
Gross amount expended         _____--    ___              -     -          927. 80
                                                                        9------------
                                                                       -9,
      Balance unexpended June 30, 1934--------------                    2,011. 96
Amount that can be profitably expended in fiscal year ending June 30,
1936, for maintenance - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -            1, 000. 00
  1
      Exclusive of available funds.
1286         REPORT OF               CHIEF OF ENGINEERS,                          U.    S.    ARMY,          1934

                                   4. SACRAMENTO RIVER, CALIF.

   Location.-This river is formed by numerous streams draining the
Trinity and Warner Mountains in northern California, and empties
into Suisun Bay at Collinsville. (See U. S. Geological Survey Topo-
graphic map of the Sacramento Valley, Calif.)
   Previous projects.-Adopted by the River and Harbor Acts of
March 3, 1875, August 7, 1882, December 21, 1889, July 13, 1892, and
August 18, 1894. The cost and expenditures thereunder prior to
commencement of operations under the existing project in 1899 were
$738,918.14, of which $185,198.19 is estimated as for new work and
$553,719.95 for maintenance. For further details see page 1985,
Annual Report for 1915.
  'Existing project.-This provides for a channel 10 feet deep at
mean lower low water and 150 to 200 feet wide from the mouth of
the river to Sacramento, 59 miles; thence 4 feet deep at low water
to Colusa, 86.2 miles; thence 3 feet deep at low water to Chico Land-
ing, 51.3 miles; and such depths as practicable thence to Red Bluff,
52.4 miles. Below Sacramento the results are to be obtained by
means of wing dams at or near shoals, supplemented by dredging.
Above Sacramento the results are to be obtained by removal of snags
and concentration of the channel by temporary works. The follow-
ing table shows the tidal and flood conditions prevailing:
                                                      Sacramento River

                                                                      Miles                       Range in feet
                             Place                                     rom-
                                                                      mouth        Mean       Extreme Ordinary         Extreme
                                                                      of river     tidal 1      tidal        flood      flood


Collinsville------.........----------------------------                    0           5.8            7.0          8        9.9
Sacramento .------------              ----------------       ------      59. 0       2 2. 0           3. 0        20       30. 0
Vernon------......----  ....----------------------------------           79.3    ----------      Trace            20       24. 0
Colusa .--..                       .145.
                       --.------------------------     --------         1.5.. 2 ..               ....--.          25       32. 0
chico Landing .          ......--------------------------------         196. 5 .--..          ..........          20       25. 0
Red Bluff..L.................__...       ..    ...-                      248. 9- .._____ _.-.-....                24        29. 0

        1 Mean lower low water to mean higher high water.                          2Tide at low-water season only.

   The estimate of cost for new work, revised in 1927, was $198,000,
exclusive of amounts expended on previous projects on the Sacra-
mento River below Sacramento. The latest (1930) approved esti-
mate for annual cost of maintenance is $200,000.
   The existing project was adopted by the following river and har-
bor acts: The act approved March 3, 1899, provided for a depth of
7 feet below Sacramento (H. Does. No. 186, 55th Cong., 2d sess., and
No. 48, 55th Cong., 3d sess.) ; the act of July 25, 1912, provided for
the work above Sacramento (H. Doc. No. 76, 62d Cong., 1st sess.);
and the act of January 21, 1927, provided for the 10-foot channel
 (H. Doc. No. 123, 69th Cong., 1st sess.). For latest published maps
of the section below Sacramento, see House Document No. 1123, Six-
tieth Congress, second session; and of the section above Sacramento,
House Document No. 76, Sixty-second Congress, first session.
   Recommended modifications of project.-Under date of April 6,
1934, the Chief of Engineers recommended improvement of the Sac-
ramento River so as to provide a depth of 6 feet between Sacramento
       RIVERS AND HARBORS-SACRAMENTO,          CALIF., DISTRICT   1287
and Colusa, and 5 feet between Colusa and Chico Landing, at an
estimated cost of $390,000, providing the flow of the river is increased
to the minimum flow of 5,000 cubic feet per second through the
operation of the proposed Kennet Reservoir. (Rivers and Harbors
Committee Doc. No. 35, 73d Cong., 2d sess.)
   In House Document No. 1893, Sixty-fourth Congress, second ses-
sion, it was recommended that Chico Landing, 1.1 miles downstream
of Red Bluff, be made the head of the improvement.
   Terminal facilities.-At Sacramento there are 4,810 linear feet of
wharves, of which 1,850 linear feet are owned by the city and 420
linear feet are open to general public use. There are 245,700 square
feet of warehouse space, of which 103,700 square feet are owned by
the city and 21,000 square feet are open to general public use.
   On the west bank, opposite Sacramento, are four wharves of a total
length of 350 feet, with 108,560 square feet of warehouse space,
all privately owned and used. Between Sacramento and Chico
Landing there are 47    -warehouses,   and numerous small landings.
Freight is also handled directly on the bank. Between Sacramento
and the mouth of the river there are, in addition to 1,440 linear feet
of wharf with warehouse facilities at Rio Vista, 17 large wharves,
about 36 large warehouses, and many small warehouses and landings,
all owned and operated by private interests. The facilities are
considered adequate for existing commerce.
    Operations and results during fiscal year.-Above Sacramento:
Government plant and hired labor removed 4,410 cubic yards from
shoals; 1,694 snags and other obstructions from the river channel
and banks; and repaired 946 linear feet of old wing dams at a cost
of $21,934.16.
    At and below Sacramento: Government plant and hired labor
dredged 590,365 cubic yards from shoals in the Sacramento River at
Sacramento; placed 4,500 cubic yards of material in spoil levees in
West Sacramento; removed 91 snags and other obstructions from the
river channel; and repaired 1,065 linear feet of wing dams at a cost
of $75,842.34. Under authority of section 3 of the River and Harbor
Act approved July 3, 1930, United States plant, operated by hired
labor, removed 249 snags and other obstructions from Elkhorn
Slough, at a cost of $970.36. A hired clamshell dredge removed
112,329 cubic yards of material from the Sacramento River and
Steamboat Slough channels, at a cost of $13,011.16. Contractors
built a road about 2,900 feet long; raised 2 vegetable packing build-
ings; and removed and replaced 1,160 linear feet of railroad siding,
all in West Sacramento, at a cost of $23,840.95.
    General and miscellaneous surveys of the river cost $4,573.19.
    The total cost was $140,172.16 for maintenance. Total expendi-
tures were $148,270.44.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1931. The controlling low-water depths in August 1933
were as follows: From the mouth of the river to the mouth of Cache
Slough, 18 feet; from the mouth of Cache Slough to Sacramento, 10
feet; from Sacramento to Colusa, 21/2 feet; from Colusa to Butte City
 (26 miles above), 2 feet; from Butte City to Sidds Landing (8 miles
above), 2 feet. There is no regular navigation above Sidds Landing,
179.4 miles above the mouth. No maintenance work has been done
above this point since 1921.
1288    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

  The total cost was $2,737,697.95, of which $196,616.74 was for new
work and $2,541,081.21 for maintenance. The total expenditures
were $2,811,428.47.
  Proposed operations.-The balance unexpended at the end of the
year, amounting to $167,895.43, including accounts receivable,
$927.69, will be applied as follows:
Accounts payable June 30, 1934-____--------------------------- $15,210.70
Maintenance :
    Dredging at Sacramento by Government plant and
      hired labor, including purchase and preparation
      of additional spoil area, July and August 1934
      and June 1935__________----,,-         _______  $75, 000. 00
    Dredging below Sacramento by contract, August
      1934 ------------------------                     6,000. 00
                                                        0,
    Snagging below Sacramento by Government plant
      and hired labor, December 1934---------------     4, 000. 00
    Maintenance of wing-dam system at and below
      Sacramento by Government plant and hired
      labor, July to November 1934 ----------------    33, 000. 00
    Dredging above Sacramento, by Government plant
      and hired labor, July and August 1934----------   3, 000. 00
    Snagging above Sacramento by Government plant
      and hired labor, July to October 1934---------- 16, 684. 73
    Maintenance of wing-dam system above Sacramento
      by Government plant and hired labor, July to
      November 1934-___     ---     - __--
                                      __--_______      15, 000. 00
                                                                   152, 684. 73
        Total--          ------------------                   -------------------167, 895. 43
  The additional sum of $150,000 can be profitably expended during
the fiscal year 1936 as follows:
Maintenance :
   Dredging at Sacramento, by Government plant and hired labor,
      including expense for spoil area, July to September 1935_----- $75, 000
   Dredging below Sacramento, by contract, August 1935------------     5, 000
    Snagging below Sacramento, by Government plant and hired labor,
       December 1935 ________-----------------_______________                            3, 000
    Maintenance of wing-dam system at and below Sacramento, by
      Government plant and hired labor, July to November 1935-----                      30, 000
    Dredging above Sacramento by contract, September 1935                  ---------     3, 000
    Dredging above Sacramento by Government plant and hired labor,
      July and August 1935___--   _____     ______________________                       3, 000
    Snagging above Sacramento by Government plant and hired labor,
      July to October 1935 __.______________       _______________                      16, 000
    Maintenance of wing-dam system above Sacramento, by Govern-
      ment plant and hired labor, July to November 1935                 -----------    15, 000
        Total      ---------------------------------------------                       150, 000
                              Cost and financial summary

Cost of new work to June 30, 1934___---_--_--_______----                         $381, 814. 93
Cost of maintenance to June 30, 1934_____              -
                                                      __________----            3, 094, 801. 16
      Total cost of permanent work to June 30, 1934----------                   3, 476, 616. 09
Value of plant, materials, etc., on hand June 30, 1934_________                     88, 013. 53
      Net total cost to June 30, 1934___-----------------                       3, 564, 629. 62
Plus accounts receivable June 30, 1934 __.._____________-----  --                       927. 09
      Gross total costs to June 30, 1934___________                             3, 565, 557. 31
Minus accounts payable June 30, 1934------------------------                        15, 210. 70
     Net total expenditures ______-__---_                                        3, 550, 346. 61
                                   __
Unexpended balance June 30, 1934_-_..        -_ --                                  166, 967. 74
     Total amount appropriated to June 30, 1934__ -------                        3, 717, 314. 35
            RIVERS AND HARBORS-SACRAMENTO,                                  CALIF., DISTRICT                    1289

   Fiscal year ending June 30         1930           1931                 1932           1933                 1934

                    .
Cost of new work ____--. ..         $29, 443. 66   $25, 042. 46 .    ..      ......         ...       ...       ..--.
Cost of maintenance_----..._-. 173, 447. 73        194, 989. 70     $171, 318. 45     $164, 749. 51         $140, 172. 16
     Total cost---------------_     202, 891. 39   220, 032. 16      171, 318. 45      164, 749. 51          140, 172. 16

Total expended----------------      187, 276. 71   213, 255. 61      233, 209. 31      138, 889. 82          148, 270. 44

Allotted ...                  147, 000. 00
          ___ ..... _____.......                   234, 000. 00       88, 699. 24      141, 252. 33          264, 300. 95


Balance unexpended July 1, 1933___---__-----      __-----------         $50, 937. 23
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934_____________________        $150, 000. 00
Amount allotted from War Department Appropriation
  Act approved July 14, 1932_______________________         23, 562. 77
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933_____________________            92, 700. 00
                                                                        266, 262. 77
      Amount to be accounted for _______       -__   _____ _____ _ 317, 200. 00
Deductions on account of revocation of impounded balances--------. 1, 961. 82

       Net amount to be accounted for________________________      315, 238. 18
Gross amount expended_________________________       $171, 515.62
Less reimbursements collected_____ ____--__-_____-
                                         -23,              245. 18
                                                                   148, 270. 44

      Balance unexpended June 30, 1934-_____________----                                              166, 967. 74
Outstanding liabilities June 30, 1934_____ ____.. ________---
                                                     --                                                18, 278. 28
      Balance available June 30, 1934_______-___________---                                           148, 689. 46
Accounts receivable June 30, 1934_____________________________-                                            927. 69

         Unobligated balance available June 30, 1934_______________ 149, 617. 15
Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 150, 000. 00
                                  5. FEATHER RIVER, CALIF.
   Location.-This river rises in the Sierra Nevada, and empties into
the Sacramento River about 20, miles above the city of Sacramento.
 (See U. S. Geological Survey sheet " Topographic Map of the Sacra-
mento Valley, Calif.")
   Previous projects.-Adopted by River and Harbor Act approved
July 27, 1916, without previously published report. The cost and
expenditures prior to the adoption of the existing project were
$6,169.46, of which $6,159.90 was from contributed funds and $9.56
from the United States funds.
   Existing project.-This provides for improvement of the river
from its mouth to Marysville by providing for a channel of such
depths as may be practicable at an average annual cost not in excess
of $10,000, and that no local cooperation be required in addition to
the contribution already made by local interests in accordance with
the requirement of the act of Congress of July 27, 1916.
   The latest (1931) approved estimate for annual cost of mainte-
nance is $1,500.
   Ordinary flood fluctuation is 20 feet and extreme flood fluctuation
is about 25 feet.
   The existing project was authorized by the River and Harbor Act
approved January 21, 1927. (Rivers and Harbors Committee Doc.
  1Exclusive of available funds.
1290         REPORT OF           CHIEF OF ENGINEERS,                  U.   S. ARMY,       1934

No. 1, 69th Cong., 1st sess.) (For latest published map see U. S.
Geological Survey " Topographic Map of the Sacramento Valley,
Calif.")
  Local cooperation.-Fully complied with.
  Terminal facilities.-There are several small landings, all pri-
vately owned. All other traffic is handled directly on the bank.
These facilities are considered adequate for the existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-This project is one of mainte-
nance. The controlling depth from the mouth at Vernon up to
Marysville is usually 3 feet from about February 15 to June 15.
The channel and banks have been cleared of the worst obstructions
and any possible navigation thereby facilitated. The work remain-
ing to be done is the removal of obstructions and construction of
wing dams as needed. The cost and expenditures for all work under
this project were $7,819.05 for maintenance, of which $3,978.95 were
United States funds and $3,840.10 contributed funds.
   Proposed operations.-No funds are available and no operations
are proposed, for the fiscal year 1935.
   The sum of $1,500 can be profitably expended during the fiscal
year 1936 for maintenance, in removing obstructions from channel
and banks by snagging, wing dams, and dredging work as needed.
                                   Cost and ftnancial swmmary
Cost of new work to June 30, 1934------------------------------                                        -
Cost of maintenance to June 30, 1934_-----------------------------                                 $3, 988. 51

      Total cost of permanent work to June 30, 1934--------------3, 988. 51
Net total expenditures______---------------------                    3, 988. 51
Total amount appropriated to June 30, 1934------------------------3,    988. 51

          Fiscal year ending June 30              1930         1931         1932        1933           1934

Cost of new work----------------                 ----------------------------------------                  -
Cost of maintenance-----------------           ------------ $1, 356. 09 $2, 127. 61    ____

Total expended----------------             ------------       1, 356. 09   2, 127. 61      ___________

Allotted.....--....--------       ----------    $2, 000. 00   1, 500. 00                -$16. 30


Amount that, can be profitably expended in fiscal year ending June 30,
1936, for maintenance ____________________--                          $1, 500

                       6. MIDDLE RIVER AND EMPIRE CUT, CALIF.
  Location.-Middle River is a connecting slough in the delta region
of the San Joaquin River. It connects with San Joaquin River 17
miles below the city of Stockton. Empire Cut is an artificial water-
way, providing with Whiskey Slough and Turner Cut a connecting
waterway between Middle River and San Joaquin River. (See
U. S. Geological Survey, California quadrangles Bouldin, Wood-
ward Island, Holt, Union Island, Stockton, and Lathrop.)
  Existing project.-This provides for a channel 9 feet deep at mean
lower low water and 100 feet wide through the shoal at the junction
of Empire Cut and Middle River, Calif. The length of the section
                RIVERS AND HARBORS-SACRAMENTO,                                                  CALIF., DISTRICT                     1291
requiring dredging is about 500 feet. The mean range of tide in
Middle River and Empire Cut is about 3 feet during seasons of
extreme low water. The estimate of cost for new work made in
1928 was $3,000. The latest (1928) approved estimate for annual
cost of maintenance is $800.
   The existing project was authorized by the River and Harbor Act
of July 3, 1930 (H. Doc. No. 481, 70th Cong., 2d sess.). The latest
published maps are in the above document and Rivers and Harbors
Committee Document No. 48, Seventy-second Congress, first session.
  Recommended modifications of project.-Under date of July 13,
1932, the Chief of Engineers recommended modification of the exist-
ing project so as to provide a channel 9 feet deep and 100 feet wide in
Middle River below Borden Highway Bridge, in Latham Slough
between Middle River and 'Empire Cut, and in Empire Cut, Whiskey
Slough, and Turner Cut between Middle River and San Joaquin
River, all at an estimated cost of $6,500 for new work, with $1,500
annually for maintenance, subject to certain conditions of local
cooperation (Rivers and Harbors Committee Doc. No. 48, 72d Cong.,
1st sess.).
   Terminal facilities.-There are no terminal facilities on these
waterways, other than bank landings along the channels.
   Operations and results du/ring fiscal year.-A clamshell dredge,
under contract, removed 7,494 cubic yards of material from the river
channel, for maintenance, at a cost of $790.23. The expenditures were
$783.03.
   Condition at end of fiscal year.-The existing project was com-
pleted in January, 1931, at a saving of $1,400 under the estimated
cost. The controlling depth is 9 feet at mean lower low water. The
total cost was $2,390.23, of which $1,600 was for new work and
$790.23 for maintenance. The total expenditures were $2,383.03.
  Proposed operations.-The balance unexpended at the end of the
year, amounting to $516.97, will be expended for accounts payable,
$7.20, and the balance in maintenance dredging, by contract, to restore
the 9-foot channel across the shoal at the junction of Middle River
and Empire Cut, in May 1935.
  No operations are proposed for the fiscal year 1936.
                                                 Cost and financial summary
Cost of new work to June 30, 1934______-- ____-______________                                                              $1, 600. 00
Cost of maintenance to June 30, 1934-------__________
                                             -790.                                                                                  23

      Total cost of permanent work to, June 30, 1934-------------                                                             2, 390. 23
Minus accounts payable June 30, 1934_____----------7.                                                                                 20

     Net total expenditures______                                                                                             2, 383. 03
Unexpended balance June 30, 1934__--_--------------------------                                                                  516. 97

           Total amount appropriated to June 30, 1934______________                                                           2, 900. 00

           Fiscal year ending June 30                               1930         1931                1932         1933               1934


Cost   of new   work--------               ----------------------              $1,600.00      ---------------             --------
Cost of maintenance...------------------------                             ----------- -----------------------                        $790.23
Total expended-------......... ---------            ------------           -     , 600.-00(                         ...------------ 783.03
                                                                                                                ----------
Allotted-- ....-------------- ------------------------                          1,600. 00 ------------           $800. 00 1            500.00
1292     REPORT    OF   CHIEF OF EN GIEER ,      U.   S.   ARMY,   1934

Balance unexpended July 1, 1933_-----------------------------$800.00
Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934_---------------------------------------------    500. 00
      Amount to be accounted for-------------------                       1,300. 00
Gross amount expended    --------------------------------------             783. 03

      Balance unexpended June 30, 1934-------------------------             516. 97
Outstanding liabilities June 30, 1934-----------------------------            7. 20

       Balance available June 30, 1934_----------------_------------        509. 77

                    7. SUISUN BAY CHANNEL, CALIF.

   Location.--Suisun Bay is about 30 miles northeast of San Fran-
cisco. (See U. S. Coast and Geodetic Survey Chart No. 5534.)
   Previous projects.-Adopted by the River and Harbor Act ap-
proved March 2, 1919. The cost to the United States of the original
project was $118,718.26, of which $58,901.25 was for new work and
$59,817.01 was for maintenance. In addition, $65,000 was contrib-
uted, of which $59,551.24 was for new work and $5,448.76 for mainte-
nance. The expenditures were $118,718.26 from United States funds
and $65,000 contributed funds, a total of $183,718.26. For further
details see page 1562 of Annual Report for 1926.
   Existing project.-This provides for a channel 30 feet deep and 300
feet wide across -Bulls Head Point Shoal, thence 26 feet deep and
300 feet wide across Point Edith and Middle Ground Shoals to the
mouth of New York Slough, and for a channel 20 feet deep and 250
feet wide extending easterly south of Seal Islands from the main
channel at Point Edith to the main channel again at Bay Point. All
depths refer to mean lower low water. The tidal range between
mean lower low water and mean higher high water is 6.3 feet. The
extreme range is 9.5 feet.
   The estimate of cost for new work revised in 1930 is $172,000, ex-
clusive of amounts expended on previous projects but inclusive of
$20,000 to be contributed by local interests. The latest (1930) ap-
proved estimate for annual cost of maintenance is $25,500.
   The existing project was authorized by the following river and
harbor acts: The act of January 21, 1927, provided for a 26-foot
channel through the bay (H. Doc. No. 554, 68th Cong., 2d sess.) ;
and the act of July 3, 1930, provided for the 30-foot channel across
Bulls Head Point Shoal, and for the channel south of Seal Islands
 (Rivers and Harbors Committee Doc. No. 23, 71st Cong., 2d sess.).
The latest published map is in Rivers and Harbors Committee Docu-
ment No. 4, Seventieth Congress, first session.
   Supplementing the work authorized by Congress, the deepening
of the channel to 30 feet at mean lower low water and 300 feet wide
through Bulls Head Point, Point Edith and Middle Ground Shoals
to the mouth of New York Slough as recommended by the Chief of
Engineers under date of June 10, 1933 (Senate Committee print, 73d
Cong., 1st seas.), is included in the Public Works program under the
National Industrial Recovery Act.
   Recommiended modifications of project.-Includedin Public Works
program.
   Local cooperation.-Underthe provisions of the River and Harbor
Act of July 3, 1930, local interests are required to contribute $20,000,
          RIVERS AND HARBORS-SACRAMENTO,                                          CALIF., DISTRICT               '1293

the entire estimated cost of deepening the channel across Bulls Head
Point Shoal to 30 feet. Compliance with this condition will not
now be required as the 30-foot Bulls Head Channel has been included
in the Public Works program incidental to the 30-foot channel ,from
deep water to Stockton.
   Terminal facilities.-Along the channel, between the western end
of the bay and the mouth of New York slough, there are 3 wharves
and 2 car-ferry slips. The facilities are considered adequate for the
existing commerce.
   Operations and results                        during
                                   fiscal year.-Work for this fiscal
year is reported under the project for San Joaquin River, and con-
sisted of operations conducted under authority of the Federal
Emergency Administration of Public Works.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1931, except for deepening the 26-foot channel across Bulls
Head Point shoal to 30 feet. The controlling depth in the main
channel in the bay is 30 feet, except between the Southern Pacific
Company railroad bridge and Avon Wharf where the controlling
depth is 26 feet. The controlling depth in the channel south of
Seal Islands is 19 feet. The cost of the existing project previous to
work done under the Public Works program as a part of the San
Joaquin River 30-foot project, was $142,026.28 for new work and
$27,525.68 for maintenance. The total expenditures were $169,551.96.
   Proposed operations.-The balance unexpended at the end of the
year, amounting to $22,500, will be expended in maintenance dredg-
ing in the 30-foot channel, by Government plant and hired labor, in
November and December 1934.
   The additional sum of $22,500 can be profitably expended during
the fiscal year 1936 for maintenance dredging in the 30-foot channel
by Government plant and hired labor, in November and December
1935. The work is necessary to maintain project depths.
                                       Cost and financial summoary

Cost of new work to June 30, 1934_ _$200,                                                                        927.53
.Cost of maintenance to June 30, 1934-------------------------                                                 7, 342. 69
        Total cost of permanent work to June 30, 1934------------                                         288, 270. 22

Net total expenditures     ___----------------------------------------                                     288, 270. 22
Unexpended balance June 30, 1934-----          --------------                                               22, 500. 00

        Total amount appropriated to June 30, 1934--------------310, 770. 22

        Fiscal year ending June 30                     1930           1931           1932          1933             1934


Cost of new work .       ..-----..----------------   $5, 590. 82 $136, 435. 46 _--------                     .--------
                                                                                                      .-----------
Cost of maintenance --    ____-      ------               11. 29 -------        $20, 822. 77     $6, 691. 62   -
     Total cost.....-----------------------           5, 602. 11   136, 435. 46    20, 822. 77    6, 691. 62

Total expended__----------------------                1, 365. 39   140, 686. 10    20, 949. 35    6, 693. 04         .
Allotted------------c----------------                20, 000. 00    86, 000. 00 ._-__-           -5, 770. 22     $22, 500. 00

  1 In addition, $65,000 was expended from contributed funds.
1294       REPORT       OF CHIEF' OF          ENGINEERS, U.            S. ARMY,        1934

Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934     -----------------------------------------   $22, 500. 00

      Balance unexpended June 30, 1934_ ----------------------                               22, 500.00
Amount that can be profitably expended in - fiscal              year ending June
                           1- - - - - - - - - - - - - - - - - -   - - - - - - - -- - - - -
30, 1936, for maintenance                                                                   22, 500. 00

                               8 SUISUN CHANNEL, CALIF.

  Location.-Suisun Slough is a tidal inlet with its mouth on the
northwest side of Suisun Bay, about 7 miles northeast of Benicia
and 36 miles northeast of San Francisco. (See U. S. Coast and
Geodetic Survey Chart No. 5534.)
  Existing project.-This provides for dredging a channel 125 feet
wide and 6 feet deep at mean lower low water up to the head of
navigation, with a harbor of the same depth at the town of Suisun
1,400 feet long and 150 feet wide, and the removal of a rock from the
center of the channel about 2 miles below the head of navigation.
The length of the section requiring dredging is about 1 mile, the
lower end of this section being about 16 miles from the mouth of
the slough. The range between mean lower low water and mean
higher high water is 6.4 feet, with an extreme range of 10 feet.
The estimate of cost for new work, made in 1908, was $25,000. The
latest (1928) approved estimate for annual cost of maintenance is
$4,000.
   The existing project was authorized by the River and Harbor Act
of June 25, 1910 (H. Doc. No. 1110, 60th Cong., 2d sess.), and
amended by the River and Harbor Act of March 4, 1913, to provide
for modification of the project by the Secretary of War. The latest
published map is in the document mentioned.
   Terminal facilities.-There are three wharves in the city of Suisun,
with a total of 530 feet of berthing space. These facilities are
considered adequate for existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1920 at a saving of $2,015 under the estimated cost. The
controlling depth is 8 feet throughout the channel and harbor basin.
The cost and expenditures of the existing project were $22,984.77 for
new work and $31,922.64 for maintenance, a total of $54,907.41.
   Proposed operations.-No funds are available and no operations
are proposed for the fiscal year 1935.
   The sum of $20,000 can be profitably expended during the fiscal
year 1936 in maintenance dredging, by contract, to restore the 6-foot
channel at and below the city of Suisun.
                                  Cost and $inancialsummary

Cost of new work to June 30, 1934---------------------------                                 $22, 984. 77
Cost of maintenance to June 30, 1934------------------------                                  31, 922. 64

      Total cost of permanent work to June 30, 1934-------------                              54,907. 41
Net total expenditures -----------------------------------                                    54, 907. 41
         Total amount appropriated to June 30, 1934---------------                            54, 907. 41

   xExclusive of available funds.
            RIVERS AND HARBORS-SACRAMENTO,                                      CALIF., DISTRICT                     1295

         Fiscal year ending June 30                1930            1931             1932             1933            1934


Cost of new work ...
Cost of maintenance_....................           $177. 21    ____--------------------          $15, 958. 40      .-----
Total expended._--_   -.---------------      _      177. 21 ------------------------               15, 958.40

Allotted..        ------------------------------ 335.12                                           I 15, 958. 40
                                                               ...........------------.......---------


Amount that can be profitably expended in fiscal year ending
June 30, 1936, for maintenance-____-__--_ ___--   ___-__    $20, 000. 00

   9. EXAMINATIONS,                 SURVEYS, AND CONTINGENCIES                                       (GENERAL)

  The cost of work during the year was $17,779.32, the expenditures
were $16,445.68. The funds unexpended at the end of the year,
amounting to $106,209.41, will be applied as needed during the fiscal
year 1935 to payment of expenses to be incurred in connection with
the above items.
  The additional sum of $15,000 can be profitably expended for
similar activities during the fiscal year 1936.
                                     Cost and financial summary

Cost of maintenance to June 30, 1934 ___ ____ ___--___--$79,                                                         718. 91
Minus accounts payable June 30, 1934-----------------------                                                       1, 404. 95
     Net total expenditures---------------                                                                     78,313. 96
Unexpended balance June 30, 1934___________________________                                                   106,209.41
          Total amount appropriated to June 30, 1934 __--____-184, 523. 37

         Fiscal year ending June 30                1930             1931             1932             1933           1934

Cost of new work         -----------------
Cost of maintenance ----------------------       $7, 602. 61   $13, 472. 00     $21, 708. 29      $13, 360. 22     $17, 779. 32

Total expended---        --------------------     7, 243. 17     12, 735. 19      22, 665. 78      13, 526. 94      16, 445. 68
Allotted---.----------------------------          4, 000. 00     18, 000. 00      14, 000. 00      14, 321. 49     121, 201. 88


Balance unexpended July 1, 1933--------------------------- $1, 453.21
Amount allotted from War Department Appropria-
  tion Act approved Apr. 26, 1934___________..            $15, 000.00
Amount allotted from War Department Appropria-
  tion Act approved July 14, 1932-------------------       98, 746. 79
Amount allotted from War Department Appropria-
  tion Act approved Mar. 4, 1933-_____--____-__     ___-     8,000. 00
                                                         -------       121, 746.79
       Amount to be accounted for_____________________________123, 200. 00
Deduction's on account of revocation of impounded balances_...              544. 91
       Net amount to be accounted for__-__---------__-                 122, 655. 09
Gross amount expended----------------------------------                 16, 445. 68
       Balance unexpended June 30, 1934_____________________ 106, 209.41
Outstanding liabilities June 30, 1934               ---          -_____1,   491. 82
                                                                         1___________---
       Balance available June 30, 1934_-__ _______---------104, 717. 59

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1______________________________        15, 000. 00
   1 Exclusive of available funds.
        91536-ENG 1934-       82
1296       REPORT OF CHIEF OF ENGINEERS,                         U. S. ARMY,       1934

                                       c 1arbor acts and committee resolutions
Status of reports called for by river and


        Locality          Authorization act      to Congress        Document No.     Recommenda-
                                                 to Congress                             tion

Mokelumne River, Flood Control Act,
   Calif., and its tribu-  Jan. 31, 1931.
  taries (preliminary
  examination for flood
   control).
Sacramento and Kern Rivers and Harbors
   Rivers, Calif., con-    Committee resolu-
1 struction restraining tion, Jan. 5, 1933.
I works near Cherokee
   Gorge.
Sacramento River, Rivers and Harbors
   Calif., debris control, Committee resolu-
  Yuba River.            tion, Aug. 18, 1933.
S acramento        River, Senate Committee res- .
  Calif., modification ex- olution, Oct. 26, 1933.
  isting project.
Sacramento, San Joa- Rivers and Harbors Apr.           6, 1934   Rivers and Harbors Favorable.
  quin, and Kern Riv-       Committee resolu-                      Committee 35, 73d
  ers, Calif.              tion, Feb. 9, 1934.                     Cong., 2d sess.


IMPROVEMENT OF RIVERS AND HARBORS                                                   IN THE
         PORTLAND, OREG., DISTRICT

   This district comprises Oregon, that part of the State of Wash-
ington the waters of which are tributary to the Columbia River
below the Snake River, and the Snake River Basin in Washington,
Idaho, Wyoming, Utah, and Nevada.
   District engineer: Maj. Oscar O. Kuentz, Corps of Engineers, to
July 21, 1933, and Maj. Charles F. Williams, Corps of Engineers,
since that date.
   Division engineer: Lt. Col. Thomas M. Robins.
                                        IMPROVEMENTS

                                          Page                                               Page
1.   Coquille River, Oreg------    1297            14. Operating and care of lock
2.   Coos Bay, Oreg---------- 1299                      and dam in Yamhill River,
3.   Coos River, Oreg__.-----      1302                  Oreg...------------------         1333
4.   Umpqua River, Oreg------ 1304                 15. Columbia River at Bonne-
5,   Yaquina !River; Oreg_ -_    - 1306                  ville, Oreg                       1334
6.   Yaquina Bay and Harbor,                       16. Operating and care of the
        Oreg------------------ 1308                       Cascades Canal, Columbia
7.   Tillamook Bay and Bar,                              River, Oreg------------           1337
         Oreg ----------------- 1311                17. Operating and care of the
8.   Colunmbia River at the                             Dalles-Celilo Canal -------         339
        mouth, Oreg. and Wash,-     1313            18. Lake River, Wash -------            1341
9.   Skipanon Channel, Oreg.._ 1316                19. Lewis River, Wash ....____          1343
10.   Columbia and Lower Wil-                       20. Cowlitz River, Wash-------          1344
        lamette Rivers below Van-                   21. Skamokawa Creek, Wash __            1347
        couver, Wash., and Port-                    22. Grays River, Wash--------           1348
       land, Oreg-----------        1318            23. Deep River, Wash - ---..     -      1350
11.   Clatskanie River, Oreg____ 1325               24. Columbia River at Bakers
12.   Willamette River a b o v e                          Bay, Wash-------------            1351
        Portland and Y amhill                       25. Examinations, surveys, and
        River, Oreg------------1327                       contingencies (general) __         1353
13.   Operating and care of canal                   26 Other projects for which no
        and locks at Willamette                           estimates are submitted-_          1354
        Falls, Oreg____-      __    1331
         RIVERS AND HARBORS        PORTLAND,   OREG.,   DISTRICT   1297
                     1. COQUILLE    RIVER, OREG.

     Tocation.-This river rises in the Coast Range, flows in a general
  wsterly direction for about 100 miles, and empties into the Pacific
  Oean at Bandon, Oreg., about 225 miles south of the mouth of the
  Cdumbia River and 420 miles north of San Francisco Bay. (See
  U.S. Coast and Geodetic Survey Charts Nos. 5802 and 5971.)
     ?revious projects.-Adopted by River and Harbor Acts of June
  14.1880, and July 13, 1892. The cost and expenditures were, for
  nee work $340,725.58, and for maintenance $41,467.17, making a
  graid total of $382,192.75. For further details see page 1986 of the
  Annual Report for 1915.
     1xisting project.-This provides for two rubble mound high-tide
  jettes at the river mouth, the south jetty 2,700 feet long and the
  norh 3,450 feet; and for a channel, 16 feet deep at mean lower low
  watr and 200 feet wide, between the sea and the eastern end of the
  norh jetty. Mean lower low water is the plane of reference. The
  tida range between mean lower low water and mean higher high
  wat(r at the river mouth is 6.8 feet, and the extreme range about 10
  feet.
     Tie estimate of cost for new work, revised in 1930, is $275,600,
  exchsive of amounts expended on previous projects. The latest
   (193() approved estimate for annual cost of maintenance is $20,000
  for dredging. There is no approved estimate for maintenance of
jettie:.
     The existing project was adopted by the following river and harbor
acts: The act of June 14, 1880, provided for the jetties (S. Ex. Doc.
No. 14, 45th Cong., 3d sess., and Annual Report for 1879, p. 1806);
the ad5 of June 25, 1910, provided for dredging shoals between the
mouth and Riverton and removing obstructions between mouth of
the Ncrth Fork and Bandon (H. Doc. No. 673, 61st Cong., 2d sess.);
the act of March 2, 1919, provided for a 13-foot channel from the
ocean lo Bandon (H. Doc. No. 207, 65th Cong., 1st sess.) ; and the
act of July 3, 1930, provided for deepening the channel to 16 feet
between the sea and the eastern end of the north jetty (H. Doc. No.
186, 70th Cong., 1st sess.). The latest published map of the entrance
is found in the last-mentioned document.
    Local cooperation.-Fully complied with.
     Terminal facilities.-At Bandon there are four wharves, all pri-
vately owned. The existing terminals are adequate for the present
commerce.
    Operations and results during fiscal year.-The only operations
consisted of making hydrographic surveys. The costs for the year
were $337.79. The expenditures were $52.61.
    Condition at end of fiscal year.-The existing project, which in-
cludes the entrance from the ocean to Bandon, is about 95 percent
completed. New work on the revised 16-foot project below Bandon
was discontinued January 14, 1933, as the expenditure of additional
funds for the completion of the 16-foot project was considered
unwarranted.
1298          REPORT OF CHIEF OF ENGINEERS,                                               U. S. ARMY,                        1934

    The jetties were completed in 1907, and the entrance channel was;
dredged to 12 and 13 feet in November 1925. The outer 300 feet
of the north jetty and the outer 200 feet of the south jetty en ck-
ments have subsided below the ordinary low-water level.         The
crest of the remaining portions of the enrockments is above low
water. A survey of the entrance in March 1934 shows a contro ing'
depth of 9 feet in a channel 400 feet wide across the ocean ba on
project channel line. The controlling depth from the ocean bar to:
Bandon was 12 feet in a channel about 200 feet wide.
  The total cost of the work under the existing project was 36,-
201.37, of which $316,640.21 was for new work and $119,561.11 for
maintenance, not including $72,891.20 for new work from contriluted
funds. The total expenditures have been $437,313.87.
  Proposed operations.-The funds unexpended June 30, 1934,
amounting to $1,128.62, will be applied as follows:
Accounts payable June 30, 1934______________                                                                                               18. 90
Surveys     -------------------------------------------------                                                                           1,109. 72

          Total                                                                                                                           28. 62
                                                                                                                                        11--------------
  The sum of $19,000 can be profitably expended during the fiscal
year 1936 for maintenance dredging of the entrance channe with
Government plant and hired labor, July 1935 and April-Juni 1936.
                                          Cost and financial summary
Cost of new work to June 30, 1934----------------------------                                                                  1   $657, 365. 79
Cost of maintenance to June 30, 1934                                 -                -------                                       16, 028. 33

      Total cost of permanent work to June 30, 1934--------                                                                         818, 394. 12
Value of plant, materials, etc., on hand June 30, 1934                                                                                 , 131. 40
                                                                                                                                      1------------

     Net total cost to June 30, 1934------------------------                                                                        819, 525.52
Minus accounts payable June 30, 1934-------------------                                                                                  18. 90

     Net total expenditures_----------------------------------                                                                      819, 506. 62
Unexpended balance June 30, 1934_____________--------------                                                                           1,128. 62

          Total amount appropriated to June 30, 1934__------------                                                                  820, 635. 24


          Fiscal year ending June 30                          1930               1931               1932                  1933             1934


C os t o f n ew w or k   _____.___..__
                                   __. .........        .    -..
                                                             . -..        . $35 , 4 38. 3 5     $8 6, 0 62. 8 8       $1 9 , 5 13 .02   .---..-
Cost of maintenance                                         $5, 817. 79        8, 445.80 _            _-          -                      1 $7, 253.94

       Total cost                                       5, 817. 79
                                  . ....-----------------------               43, 884. 15        86, 062. 88           19, 513. 02         7, 253. 94
Total expended _..._______        _.---       .
                                          _----.   -.          773. 34        37, 033. 28        91, 422. 82           22, 924. 10             52. 61

Allotted ______--____-..-......
                -   -     --                                 8, 400. 00     108, 000. 00         30, 000. 00           18, 861.80       -18,919.   26


  1 $6,916.15 charged into completed work account of loss on sale of plant.

Balance nnexpended July 1, 1933_ __--__------------------------   $20, 100. 49
Deducticns on account of revocation of allotment_---------------- 18, 919. 26
      Net amount to be accounted for ---_--_--------_------------1,                                                                        181. 23
Gross amount expended--------------- --------------                                                               $549. 61
     In addition $72,891.20 was expended from contributed funds.
           RIVERS AND HARBORS-PORTLAND,              OREG., DISTRICT           1299
Less:
    Reimbursements collected---------________  $92. 00
    Receipts from sales--------- ------------- 405. 00
                                                              $497. 00
                                                                               $52. 61
       Balance unexpended June 30, 1934 _____________________             1, 128. 62
,Outstanding liabilities June 30, 1934 _________________________--            18.90
        Balance available June 30, 1934 _______-1,                             109. 72

Amount that can be profitably expended in fiscal year ending June
  30, 1936, for maintenance   1                                          19,   000. 00
                              2. COOS BAY, OREG.

    Location.-This bay is located on the Oregon coast about 200
miles south of the mouth of Columbia River and 445 miles north
of San Francisco Bay. It is about 13 miles long and 1 mile wide,
with an area at high tide of about 15 square miles. (See U. S.
,Coast and Geodetic Survey Charts Nos. 5802 and 5984.)
    Previous projects.-Adopted by River and Harbor Acts of March
:3, 1879, September 19, 1890, and August 18, 1894. Both the cost
and expenditures thereunder were $980,897.27, of which $802,096.44
was for new work and $178,800.83 for maintenance. For further
details see page 1987 of Annual Report for 1915.
    Existing project.-This provides for two rubble-mound high-tide
jetties at the entrance; for dredging on the bar; and for a channel
between the bar and Millington, on Isthmus Slough, 24 feet deep
through Pigeon Point Reef and 22 feet elsewhere, 300 feet wide in
front of Marshfield, North Bend, and through the rocky reef near
Pigeon Point, and generally 200 feet elsewhere to Smith's mill, and
150 feet wide above Smith's mill to Millington. The plane of refer-
,ence is mean lower low water.

,andThe mean of the higher high waters above the plane of reference
       the extreme tidal ranges at the entrance are 6.7 feet and about
11 feet, respectively, and at Marshfield 6.9 and 10 feet, respectively.
    The estimate of cost for new work, revised in 1930, was $3,981,600,
exclusive of amounts expended on previous projects. The latest
  (1930) approved estimate for annual cost of maintenance is $165,000,
.not including repairs to the jetties.
    The existing project was adopted by the following river and
harbor acts: The act of September 19, 1890, provided for two jetties
  (Annual Report for 1890, p. 2936); the act of June 25, 1910, pro-
vided for dredging the ocean bar channel (H. Doc. No. 958, 60th
Cong., 1st sess.); the act of March 2, 1919, provided for the 22-foot
channel to Smith's mill (H. Doc. No. 325, 65th Cong., 1st sess.);
the act of September 22, 1922 (H. Doc. No. 150, 67th Cong., 2d sess.),
provided for the restoration of the north jetty, 9,600 feet long,
,construction of a south jetty about 3,900 feet long, and the extension
of the 22-foot bay channel from Smith's mill to Millington; the
act of January 21, 1927, authorized the extension of the jetties to
such lengths as may be practicable within the estimate of total cost
of the jetties, $3,250,000, as given in the former document; and the
act of July 3, 1930, provided for a channel 24 feet deep and 300
  1Exclusive of available funds.
1300   REPORT OF CHIEF OF ENGINEERS,        U. S. ARMY,   19 3 4

feet wide through Pigeon Point Reef, following a location along
the westerly side of the bay (H. Doc. No. 110, 70th Cong., 1st sess.).
The latest published maps are in the last-mentioned document, and.
Senate Committee Print, Seventy-third Congress, second session.
   Recommended modifications of project.-Under date of April 26,
1934, the Chief of Engineers recommended that the existing project:
for Coos Bay be modified so as to provide for a channel from Pigeon
Point Reef to Smith's Mill 24 feet deep and generally 250 feet wide,
with the width increased to 450 feet at the bridge and to 300 feet in
front of North Bend and Marshfield, and for a turning basin 1,000,
feet long and 600 feet wide opposite Coal Bank Slough, all at an
estimated cost of $184,000 for new work with no increase in the pres-
ent authorized annual cost of maintenance, subject to certain condi-
tions of local cooperation. (Senate Com. Print, 73d Cong., 2d sess.)
   Terminal facilities.-At North Bend there is a municipal wharf
384 feet long fronting on the channel and about 1,400 feet of privately
owned mill wharves. At Marshfield there is a broken line of
privately owned wharves about 4,500 feet in length, and one public,
wharf with a frontage of about 1,006 feet. About 1 mile above
Marshfield there is a sawmill wharf about 1,000 feet in length. The,
existing terminals are considered adequate for the needs of the
present commerce.
   Operations and results during fisoal year.-Maintenance of bar-
channel was in progress by the U. S. dredge Col. P. S. Michie from.
March 1934, to end of year, and A. Mackenzie for 8 days in July 1933..
The Michie removing 285,064 cubic yards at a cost of about $0.068=
per cubic yard and the Mackenzie removed 44,771 cubic yards at a
field cost of about $0.12 per cubic yard. When conditions were un--
favorable for bar work the Michie dredged the bay channels, remov-
ing a total of 107,115 cubic yards at a cost of about $0.07 per cubic-
yard. A contract was entered into for maintenance dredging in the,
bay channel between the Southern Pacific Railroad bridge and
Smith's Mill, above Marshfield.
   At the end of the fiscal year the contractor had removed a total of
190,758 cubic yards, all from the Marshfield end of the work.
Repairs to the dredge Michie were made at a cost of $74,708.91.
   The cost of all permanent work during the year under the existing
project for Coos Bay totaled $59,091.37. The expenditures were-
$49,939.48.
   Condition at end of  fiscal  year.-The existing project was com-
pleted at a saving of $57,867 under the estimated cost. The south
jetty was completed in 1928, its length being 4,576 feet, and the
north jetty in 1929, its length being 7,616 feet. The other features;
of the project were completed in 1932. At the beginning of the fiscal
year the controlling depth was 32 feet on the ocean bar and between
the jetties. After dredging ceased, during the winter months, the
bar shoaled to 24 feet, and this condition continued until June 1934,
when dredging was resumed. At the close of the fiscal year the
controlling depth in the entrance channel was 25 feet. The con-
trolling depth between the entrance and the Southern Pacific Rail-
road bridge is 20 feet and from the railroad bridge to the head of the
bay 18 feet in a channel 200 feet wide.
               RIVERS AND HARBORS-PORTLAND,                                  OREG., DISTRICT                        1301
  The total cost of the work under the existing project was $6,435,-
012.11, of which $3,921,019.42 was for new work and $2,513,992.69
for maintenance, not including $2,713.14 for new work and $8,386.86
for maintenance from contributed funds. The total expenditures
have been $6,754,065.74, of which $6,742,965.74 were United States
funds and $11,100 contributed funds.
    Proposed operations.-The funds unexpended June 30, 1934, in-
cluding accounts receivable and amounts expected to be received
from rental of plant, will be applied as follows:
Accounts payable June 30, 1934 _______--------_-------            $32, 499. 46
Maintenance:
    Dredging bar and lower bay channels, by Government plant and
      hired labor, November and December 1934, and April to
      June 1935-----------------------------------------           71, 200. 00
    Dredging upper bay channel by contract July and October 1934_ 38, 400. 00
    Surveys and inspections---------------------------------2,         600. 00

      Subtotal  -- ---------------------------------------                                                    144, 699. 46
Balance remaining---            --                                                                                      57
                                                                                                                   1--_________---154.
           Total __---------__                          ____-_                                                144, 854.03
The additional sum of $100,000 can be profitably expended for
maintenance during the fiscal year 1936 as follows:
Maintenance:
   Dredging bar and lower bay channels, with Government plant and
     hired labor, November 1935 and April-June 1936____________ $60, 000
   Dredging upper bay channel, by contract, March-June 1936-_.... 40, 000
          Total         -----------------------------------------------                                          100, 000

                                      Cost and financial summary

Cost of new work to June 30, 1934 __.    ___---_______-       $4, 723, 115.86
Cost of maintenance to June 30, 1934-----------------------2,     692, 793. 52
      Total cost of permanent work to June 30, 1934                            ---------                17,   415, 909. 38
Value of plant, materials, etc., on hand June 30, 1934-----------                                             340, 168. 09

      Net total cost to June 30, 1934-----------------------                                              7, 756, 077. 47
Plus accounts receivable June 30, 1934 _____________---
                                                 -----.                                                           285. 00

      Gross total costs to June 30, 1934 ____-___________-                                                7, 756, 362. 47
Minus accounts payable June 30, 1934_ ..---      -__-_--_----- --                                             32, 499. 46

     Net total expenditures__--- ---------------                                        _                 7, 723, 863. 01
Unexpended balance June 30, 1934 .---........                                      _________                  81, 369. 13
          Total amount appropriated to June 30, 1934_ -                                  ___-_-           7, 805, 232. 14

   Fiscal year ending June 30              1930            1931             1932                 1933              1934


Cost of new work___ _______      _ $248, 747. 30         $45, 332. 15    $79,099.64      _____
Cost of maintenance_       ..------------308, 957. 35    438, 217. 81    114, 985.97      $180,347.43           a $72, 495.87

      Total cost.---------------         557, 704. 65    483, 549. 96     194, 085. 61     180, 347. 43            72, 495. 87
Total expended----------------561,            253. 45    441, 918. 13     153, 899. 60     161, 162. 41            49, 939. 48
Allotted-----------.----     _ --        312, 000. 00    107, 000. 00   -139, 367. 02      223, 635. 13            25, 797. 27

  o$13,404.50 charged into completed work account of loss on sale of plant.
   a In addition, $11,100 was expended from contributed funds.
1302      REPORT    OF CHIEF OF ENGINEERS,         U.   S. ARMY,       1934

Balance unexpended July 1, 1933                           $105, 511.34
Amount allotted from War Department Appropriation Act ap-
proved July 14, 1932_______ _____________ 1________1       44, 129. 47

     Amount to be accounted for_______________________                     149, 640. 81
Deductions on account of revocation of allotment ____-_____-
                                                          -                 18, 332. 20
      Net amount to be accounted for _____________________                 131, 308. 61
Gross amount expended-_-__      _________________ $202, 559. 59
Less-
    Reimbursements collected- -__-     -$141, 472.92
    Receipts from sales ______     -______ 11,147. 19
                                                            152, 620. 11
                                                                            49, 939.48

      Balance unexpended June 30, 1934_ .... _____-___----                  81, 369. 13
Outstanding liabilities June 30, 1934 __--______--    $29, 213. 82
Amount covered by uncompleted contracts----------44, 761. 60
                                                                            73, 975.42
     Balance available June 30, 1934_ __-.._______-___-----                   7, 393. 71
Accounts receivable June 30, 1934___________        _____                        285. 00

        Unobligated balance available June 30, 1934__--..        ___          7, 678. 71

Amount that can be profitably expended in fiscal - year ending
                                                        -
June 30, 1936, for maintenance 1_ __ _______ ________       _             100, 000. 00

                                   3. COOS RIVER, OREG.
   Location.-This river rises in the Coast Range in southern Oregon,
flows about 60 miles in a westerly direction, and empties into Coos
Bay near Marshfield, Oreg. (See U. S. Geological Survey, Coos
Bay quadrangle.)
   Existing project.-This provides for snagging and boulder re-
moval in a channel width of 50 feet from the mouth of the river
to the head of navigation in both forks, to provide a depth of 3 feet
generally and 1 foot near, the heads of navigation. The section
under improvement includes the mouth and 51/2 miles of the main
river and about 81/2 miles of each fork. The plane of reference
is mean lower low water.
   The mean of the higher high waters above the plane of reference
and the extreme tidal ranges under ordinary conditions at the mouth
of the river are 6.9 and 10 feet, respectively, and there is a tidal
range of about 1 foot at the head of navigation in the forks. Freshet
stages usually reach a height of from 10 to 15 feet at Allegany.
The estimate of cost for new work, revised in 1898, was $8,000. The
latest (1923) approved estimate for annual cost of maintenance is
$3,000.
   The existing project was adopted by the River and Harbor Act of
June 3, 1896 (H. Doc. No. 237, 53d Cong., 3d sess.). The latest
published map is in this document.
   Terminal facilities.-There are several small privately owned
wharves and landing places on the river that are used by small
steamers and launches. There are no publicly owned wharves. The
existing terminal facilities are believed to be adequate for the pres-
ent needs of navigation.
   Operations and results during fiscal year.-Annual maintenance
of the project channels in the main river and in the forks, was done
  1Exclusive of available funds.
                 RIVERS AND HARBORS-PORTLAND,                                         OREG., DISTRICT                      1303
during May and June 1934. The work was done by a 2 -cubic yard                                         11/
bucket dredge hired by the hour. During the year the dredge
removed 5,677 cubic yards of sand and gravel at a cost of $2,029.16,
or about $0.357 per cubic yard. The expenditures were $1,713.85.
  Condition at end of fiscal year.-The project was completed in
1899. The controlling depth after annual maintenance dredging is
about 4 feet, with a zero gage reading, in a channel about 50 feet
wide from the mouth to the head of navigation on both forks, a dis-
tance of about 23 miles. During August and September the river is
at its lowest stage.
  The costs have been $64,700.70, of which $8,000 was for new work
and $56,700.70 for maintenance. The expenditures were $64,385.39.
  Proposed operations.-The funds unexpended June 30, 1934,
amounting to $945.59, will be applied as follows:
Accounts payable June 30, 1934                                  ------------------------------- $299. 56
Maintenance: Surveys-----                                                             ----       6------------------
                                                                                             -- 646.   03
            Total                        __-----------------------------------------------                                945. 59
   The additional sum of $2,400 can be profitably expended during
fiscal year 1936, for maintenance, dredging, and snagging, by con-
tract, on north and south forks, May and June 1936.
                                             Cost and financial summary
Cost of new work to June 30, 1934_----------                                                                           $8,000.00
Cost of maintenance to June 30, 1934 ------------------------                                                          56, 700. 70

      Total cost of permanent work to June 30, 1934-------------- 64, 700. 70
Value of plant, materials, etc., on hand June 30, 1934-------------- -15. 75
      Net total cost to June 30, 1934------------------         64, 684.95
Minus accounts payable June 30, 1934---------------------------    299. 56

     Net total expenditures-------   ----------------------- 64, 385. 39
Unexpended balance June 30, 1934-------- ---------------------   945. 59

            Total amount appropriated to June 30, 1934                                 --------------                  65, 330. 98

           Fiscal year ending June 30                       1930          1931           1932             1933             1934

Cost ofnew work..--------------------------
Cost of maintenance---------------..... ------- $3, 892.46              $3, 068. 61      $901.46          $837.87         $2, 029. 16
Total expended....-----------------------                  3, 069. 58    2, 695. 51     2, 227. 11       1, 123. 27        1, 713.85

Allotted ..-----...........-----------------------------   3, 000. 00    2, 000. 00     .....------------ 1, 937. 31         -6. 33


Balance unexpended July 1, 1933-----__---------------------- $2, 665.77
Deductions on account of revocation of allotment------------------_       6. 33
      Net amount to be accounted for------------------------        2, 659. 44
Gross amount expended-------------------$--------1, 998. 85
Less reimbursements collected-------------------------285. 00
                                                                    1,713.85
      Balance unexpended June 30, 1934                                  45. 59
                                                                       9-----------------------
Outstanding liabilities June 30, 1934_----------------------------_    299. 56
      Balance available June 30, 1934                                  6-----------------------
                                                                       646. 03
Amount that can be profitably expended in fiscal year ending June 30,
    1936, for maintenance 1-------___                                                                                   2,400. 00
    1Exclusive of available funds.
1304    REPORT OF CHIEF OF ENGINEERS,       U.   S.   ARMY,   1934

                      4. UMPQUA RIVER, OREG.

   Location.-This river rises in the Cascade Range, flows westerly
about 120 miles, and empties into the Pacific Ocean about 180 miles
south of the mouth of the Columbia River and about 465 miles north
of San Francisco Bay. (See U. S. Coast and Geodetic Survey
Charts Nos. 5802 and 6004.)
   Previous projects.-Adopted by act of March 3, 1871, and modi-
fied in 1886. The total cost and expenditures under previous proj-
ects were $39,242.29, all for new work. (For further details see p.
2967 of Annual Report for 1898.)
   Existing project.-This provides for a jetty on the north side of
the entrance approximately 8,000 feet in length westerly from the
high-water line to the sea; for dredging on the ocean bar; and for
the construction of a south jetty if sufficient improvement is not af-
forded by the north jetty and dredging. The present authorization
for a south jetty is limited to an expenditure of $500,000.
   Mean lower low water is the plane of reference. The tidal range
between mean lower low water and higher high water at the river
mouth is 6.8 feet, and the extreme range is about 10 feet.
   The estimate of cost for new work, revised in 1930, is $1,753,000,
exclusive of dredging and of amounts expended under previous
projects. The latest (1930) approved estimate for annual cost of
maintenance (north jetty only) is $50,000.
   The existing project was adopted by the following river and
harbor acts: The act of September 22, 1922, provided for a north
jetty 7,500 feet in length (H. Doc. No. 913, 65th Cong., 2d sess.) and
the act of January 21, 1927, provided for the present dimensions of
north jetty and for dredging the ocean bar (H. Doc. No. 320, 69th
Cong., 1st sess.). The act of July 3, 1930, provided for a south jetty
 (H. Doc. No. 317, 70th Cong., 1st sess.). The latest published maps
are in the last-mentioned document and Rivers and Harbors Com-
mittee Document No. 9, Seventy-second Congress, first session.
   Recommended modifications of project.-Under date of February
15, 1932, the Chief of Engineers recommended modification of the
existing project so as to provide for the construction of the south
jetty extending to a point about 1,800 feet south of the outer end of
the present north jetty, at an estimated cost of $1,200,000, and dredg-
ing to provide a usable channel 26 feet deep at mean lower low
water, at an estimated annual cost of $150,000, including jetty
maintenance, subject to certain conditions of local cooperation.
 (Rivers and Harbors Committee Doc. No. 9, 72d Cong., 1st sess.)
   Local cooperation.-Fully complied with.
   Terminal facilities.-At Gardiner there is approximately 250 feet
of wharf frontage, of which 60 feet is publicly owned. At Reeds-
port, there is about 750 feet of usable wharf frontage, all privately
owned. There is no public wharf at Reedsport, but there is about
700 feet of publicly owned water frontage. The port of Umpqua
owns a wharf with about 75 feet of water frontage which has not
been used generally for commercial shipping. The existing terminals
are believed adequate for present commerce.
   Operations and results cdurinp fiscal year.-Construction of the
south jetty, about 2,600 feet long from the high-tide line seaward,
           RIVERS AND 'HARBORS-PORTLAND,                         OREG.,   DISTRICT      1305
was completed in November 1933. During the year the contractor
delivered and placed 124,781 tons of stone, completing the enrock-
ment on November 15, 1933. Surveys of the entrance were made at
a cost of $1,171.23. The total cost for the year was $163,864.70, of
which $162,693.47 was for new work and $1,171.23 was for mainte-
nance. The expenditures were $190,316.07.
   Condition at end of fiscal year.-The existing project is about 90
percent completed. The north jetty was completed in 1930. Experi-
mental dredging only has been done on the bar. The short south
jetty was completed in November 1933.
   The sea end of the north jetty for about 500 feet has been beaten
down by the seas to such extent that it is submerged at high tide.
   Soundings taken on the bar near the close of the year show a con-
trolling depth of 16 feet over a width of about 500 feet, following
the channel range. Vessels drawing 18 feet may now cross the bar
at high tide, under obtaining sea conditions.
   The channel from the entrance to Reedsport was dredged to a
depth of 16 feet in 1924 by the port of Umpqua, but has shoaled to
about 11 feet. No maintenance work has been done in the river
channel, which is to be maintained by the port of Umpqua.
   The total cost of work under the existing project was $1,602,369.34,
of which $1,265,666.38 was for new work and $336,702.96 for mainte-
nance, not including $276,500 for new work from contributed funds.
The expenditures have been $1,878,572.47, of which $1,602,072.47 were
United States funds and $276,500 contributed funds.
   Proposed operations.-The funds unexpended June 30, 1934,
amounting to $4,312.87 will be applied to maintenance as follows:
Accounts payable June 30, 1934      ------------------------------- $355. 10
Surveys, inspection and engineering      _----------------------    3,957. 77
      Total---------               -------------------------------                   4, 312. 87
  The additional sum of $35,000 can be profitably expended during
the fiscal year 1936 for maintenance dredging in entrance channel,
with Government plant and hired labor during September and
'October 1935.
                            Cost and financial sumnary
Cost of new work to June 30, 1934 ------------------------                     $1,304, 908. 67
Cost of maintenance to June 30, 1934---------------------                        2336, 702. 96
      Total cost of permanent work to June 30, 1934----------    1, 641, 611. 63
Value of plant, materials, etc., on hand June 30, 1934----------          55. 63
      Net total cost to June 30', 1934----------------------- 1,641, 667. 26
Minus accounts payable June 30, 1934--------------------------       352. 50

     Net total expenditures-------              ------------------             1, 641, 314. 76
Unexpended balance June 30, 1934 __             --         --.                      4,312. 87
       Total amount appropriated to June 30, 1934------                        1,645, 627. 63
  1 In addition $276,500 was expended from contributed funds.
  2 $2,420 credited to completed work account of gain on sale of plant.
1306       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934


   Fiscal year ending June 30             1930           1931              1932             1933              1934


Cost of new work___ ... ___ __ .       $237, 116. 82   $89, 051. 13      $21, 060. 71    $130, 802. 49      $162, 693. 47
Cost of maintenance---......---_         35, 103. 31   107, 950. 59       98, 675. 62      32, 222. 21        1 1, 171. 23

     Total cost.---------------         272, 220. 13   197, 001. 72      119, 736. 33     163, 024. 70       163, 864. 70

Total expended------_-------_           286, 196. 26   180, 436. 63      127, 727. 55     102, 180. 86       190, 316. 07

Allotted---------------
              ......               -    177, 000. 00   110, 000. 00     -30, 000. 00      299, 206. 04       -5, 320. 70

1 In addition $276,500 was expended from contributed funds.
Balance unexpended July 1, 1933_-____ _-_-
                                        -      ____----_--                                               $199, 949. 64
                                                  ---
Deductions on account of revocation of allotment____________                                                5, 320. 70

      Net amount to be accounted for--__-----___---                                -     ___              194, 628.94
Gross amount expended -_    _____      -      -- _-                               $192, 893. 78
Less:
     Reimbursements collected ----------                              $107. 71
     Receipts from sales _________                       ____ 2, 470. 00
                                                                                        2, 577. 71
                                                                                                          190, 316. 07

      Balance unexpended June 30, 1934__----------------------                                              4, 312. 87
Outstanding liabilities June 30, 1934 _________________--
                                                    -     -    -                                               355. 10

        Balance available June 30, 1934______ -                                 --
                                                                              _______----3,                    957. 77
Amount that can be profitably expended in fiscal year ending
June 30, 1936, for maintenance 1_-_  ,_- -      -      -                                                  35, 000. 00
                                   5. YAQUINA RIVER, OREG.
   Location.-This river rises in the Coast Range, flows about 50 miles
in a westerly direction, and empties into Yaquina Bay, on the Oregon
coast. (See U. S. Coast and Geodetic Survey Charts Nos. 6058 and
5802.)
   Existing project.-This provides for two controlling half-tide dikes
of piling, brush, and stone, each about 1,100 feet long (constructed
by local interests), and for a channel 10 feet deep and 150 feet wide
in straight reaches and 200 feet wide on curves, and in Depot Slough
from Yaquina at the mouth of the river to Toledo on Depot Slough,
about 9 miles above the mouth. Mean lower low water is the plane
of reference.
   The mean of the higher high waters above the plane of reference
and the extreme tidal ranges under ordinary conditions at the mouth
of the river are 8 feet and about 11.5 feet, and about the same at
Toledo. Freshet heights are about 12 feet at the mouth of Depot
Slough.
   The estimate of cost for new work, made in 1911, was $72,000, of
which amount 60 percent was contributed by local interests. The
latest (1911) approved estimate for annual cost of maintenance is
$1,500.
   The existing project was adopted by the River and Harbor Act of
March 4, 1913. (H. Doc. No. 519, 62d Cong., 2d sess.) The latest
published map is in that document.
   Local cooperation.-Fullycomplied with.
   Terminal facilities.-At Yaquina, at the mouth of the river which
is also the head of the bay, there is a small wharf of about 50 feet
  1 Exclusive   of available funds.
             RIVERS AND HARBORS-PORTLAND,                  OREG.,   DISTRICT       1307
frontage owned by the Southern Pacific Co., whose branch line termi-
nates there. The port of Toledo has a public wharf in Depot
Slough, at Toledo, with frontage of about 600 feet. The city of
Toledo also has a public wharf of about 50 feet frontage on Depot
Slough, built to accommodate small motor boats. There are also at
Toledo two privately owned slips having special facilities for trans-
ferring lumber to lighters.
   The existing terminals are adequate for the present needs of
commerce.
   Operations and results during fiscal year.-The only operations
were minor surveys and inspections. The costs for the year were
$120.73. The expenditures were $97.80.
   Condition at end of fiscal year.-The existing project was coin-
pleted in 1914.
   The controlling depth between the mouth of the river and Toledo
is about 9 feet at mean lower low water in a channel 100 feet wide.
The controlling depth is adequate for existing navigation, which
consists mostly of barges used for lightering lumber from Toledo to
ocean vessels with load drafts of about 18 feet at Newport on
Yaquina Bay.
   In Depot Slough the depth is about 9 feet, except for a short
distance at extreme upper end of the project channel, where the
depth is about 7 feet. Above Toledo to the head of navigation the
controlling depth is about 2 feet in a channel 100 feet wide at mean
lower low water.
   The total cost of the work under the existing project was $70,-
699.41, of which $28,800 was for new work and $41,899.41 for main-
tenance, not including $43,200 for new work and $3,000 for mainte-
nance from contributed funds. The total expenditures have been
$116,875.15, of which $70,675.15 were United States funds and
$46,200 contributed funds.
   Proposed operations.-The funds unexpended June 30, 1934,
amounting to $407.61, will be applied as follows:
Accounts payable June 30, 1934                             -----
                                                              $24. 26
Surveys and inspection--------------------------------------383.35
         Total -----------         ---------------------------------              407. 61
   The sum of $15,000 can be profitably expended during the fiscal
year 1936 for maintenance dredging with Government plant and
hired labor during November and December 1935 and January 1936.
                              Cost and financial summary

Cost of new work to June 30, 1934             ------------------------- $28, 800. 00
Cost of maintenance to June 30, 1934           ------------------------- 41, 899. 41
      Total cost of permanent work to June 30, 1934   .-------------
                                                                70, 699. 41
Minus accounts payable June 30, 1934---------------------------      24. 26
      Net total expenditures- ------- ------------------------ 70, 675. 15
Unexpended balance June 30, 1934------------------------------     407. 61
         Total amount appropriated to June 30, 1934---------------             71, 082. 76
  1 in   addition, $46,200 was expended from contributed funds.
1308        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934


        Fiscal year ending June 30                 1930          1931            1932           1933            1934

Cost ofnew work ---------------------
Cost of maintenance_     ..----     ----           ------- _---$16,
                                      _-------------..                            317. 05    $11,461. 63         $120.73
Total expended--------          --------------------------------               12, 590. 38    15, 186. 97          97. 80
Allotted--.--- --.-------------------------      $1, 500. 00   $9, 500. 00   ------------      8, 384. 05       -101. 29


Balance unexpended July 1, 1933------------------------------$606. 70
Deductions on account of revocation of allotment-------------------101. 29

      Net amount to be accounted for---------------------------505.                                                41
Gross amount expended_-        __-------                                                                        97.80

      Balance unexpended June 30, 1934------------------------                                                 407. 61
Outstanding liabilities June 30, 1934-----------------------------                                              24. 26
         Balance available June 30, 1934---------------------------                                            383.35

Amount that can be profitably expended in fiscal year ending June 30,
   1936, for maintenance 1---------------______                                                             15, 000. 00

                         6. YAQUINA BAY AND HARBOR, OREG.

    Location.-This bay is located on the Oregon coast, about 115 miles
south of the mouth of the Columbia River. (See U. S. Coast and
Geodetic Survey Charts Nos. 5802 and 6058.)
    Previous projects.-The River and Harbor Act of June 14, 1880,
provided for the improvement of the entrance. Subsequent projects
were adopted by acts of June 3, 1896, June 6, 1900, and March 3,
1905. The total cost and expenditures were $713,338.96, of which
 $707,313.45 was for new work and $6,025.51 for maintenance. For
further' details see the Annual Report for 1893, part 4, page 3314,
and House Document No. 68, Fifty-fourth Congress, first session;
House Document No. 110, Fifty-sixth Congress, first session; and
House Document No. 109, Sixty-fifth Congress, first session.
    Existing project.-This provides for 2 high-tide, rubble-mound
jetties at the entrance, 1,000 feet apart at the end of the north jetty;
the north jetty to be 3,700 feet in length, and the south jetty to be
5,800 feet in'length and to project seaward about 800 feet beyond the
end of the north jetty; for a spur jetty on the channel side of the
south jetty 4,700 feet from its sea end, 800 feet in length, to deepen
the channel across the inner bar between the jetties; for 5 groins
channelward from the south jetty; for the removal of subaqueous
rock from the reef between the jetties, to secure a depth of 20 feet
at mean lower low water in the entrance; and for a channel 200 feet
wide and 18 feet deep from the entrance to the railroad terminus at
Yaquina, a distance of about 41/2 miles. Mean lower low water is
the plane of reference.
    The mean of the higher high waters above the plane of reference
and the extreme tidal ranges at the entrance and at the head of the
bay are 8 feet and about 111/2 feet, respectively.
    The estimate of cost for new work, revised in 1920, was $1,518,430,
exclusive of the amount expended on previous projects. The latest
  (1919) approved estimate for cost of maintenance is $5,000 eery
   1Exclusive of available funds.
         RIVERS AND HARBORS-PORTLAND,         OREG.,   DISTRICT,   1309
2 years to maintain 18 feet in the bay channel. The latest (1928)
approved estimate for annual cost of maintenance is $30,000 for
dredging' in the entrance. There is no, approved estimate for main-
tenance of the jetties.
    The existing project was authorized by the following river and
harbor acts: The act of June 14, 1880, provided for the improvement
of the entrance; no project was adopted (see Annual Report for 1881,
p. 2589); the act of June 6, 1900, provided for rock removal at en-
trance (H. Doc. No. 110, 56th Cong., 1st sess.); the act of March 3,
1905, repealed the previous acts relating to the improvement of the
entrance, but provided for 2 years' maintenance; the act of March 2,
1919, provided for the restoration and extension of the jetties con-
structed under previous projects, rock removal in the entrance, and
dredging in the bay up to the railroad terminus at Yaquina (H. Doc.
No. 109, 65th Cong., 1st sess.). The latest published map is in the
last-mentioned document.
    Local cooperation.-Fully complied with.
    Terminal facilities.-Newport has about. 750 feet of wharf front-
age, of which about 450 feet is publicly owned. At Yaquina (the
terminus of the- Southern Pacific Co.'s branch rail line) the railroad
maintains a wharf with a frontage of albout 50 feet. There are no
publicly owned terminals at Yaquina. The existing terminals are
adequate for the present commerce.
    Operations and results during fiscal year.-The work of restora-
tion of the north and south rubble mound jetties, in progress at
the beginning of the year under contract, was completed on May 2,
1934.
    On the south jetty the contractor constructed 49 bents, or 784
lineal feet of pile and timber jetty tramway, to bent no. 463, the sea
end; 91,603.93 tons of stone were placed in the jetty enrockment.
    On the north jetty 200 bents, or 3,200 lineal feet of pile and tim-
ber jetty tramway ' was constructed 'to bent: no. 392, the sea end;
85,481.31 tons of stone were placed in the jetty enrockment.
    Surveys of the bay and entrance during the year cost $1,785.19.
The total costs for the year were $351,928.32, all for maintenance.
The expenditures were $394,119.46.
    Conditions at end of fiscal year.-The existing project was com-
pleted in 1930. Since completion of restoration as noted above, the
enrockment of both jetties has remained in good condition. A
survey of the entrance made in May 1934 shows a mean lower low-
water depth of 201/2 feet for 400 feet wide over a rocky reef near
the sea end of the south jetty.
   Between the jetties, inside the rocky reef, the depth is 19 feet on
channel range with depth of 20 feet between the range and the
south jetty. On the ocean bar the depth is 131/2 feet for a width of
400 feet on the channel range, and a depth of 15 feet, 300 feet south
of the range. In the bay channel to Yaquina the controlling depth
is 17 feet.
   The total cost of the work under the existing project was $1,469,-
4 88.78, of which $823,992.83 was for new work and $645,495.95 for
maintenance, not including $729,168.48 for new work from con-
tributed funds. The total expenditures have been $2,198,688.67, of
1310         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

which $1,469,520.19 were United States funds and $729,168.48 con-
tributed funds.
   Proposed operations.-The funds unexpended June 30, 1934,
amounting to $54,650.68, will be applied as follows:
Accounts payable----   -------------------------------------                                                        $572. 45
Balance remaining-______-_________ _____ _                                                                        54, 078.23

            Total        --------------------------------------------                                             54, 650. 68
  The sum of $50,000 can be profitably expended during the fiscal
year 1936 for maintenance dredging in bar and bay channels with
Government plant and hired labor, July to September 1935.
                                       Cost and financial summary
Cost of new work to June 30, 1934--_________ _--------                                      __             $1, 531, 306. 28
Cost of maintenance to June 30, 1934 ------------------------                                                  651, 521. 46
      Total cost of permanent work to June 30, 1934                                  ----------            2, 182, 827. 74
Value of plant, materials, etc., on hand June 30, 1934                                ----------                   603. 86

      Net total cost to June 30, 1934--------------------- 2, 183, 431. 60
Minus accounts payable June 30, 1934__-------------------------    572.45

     Net total expenditures_----------------------------2, 182, 859. 15
Unexpended balance June 30, 1934--------------------------  54, 650. 68
           Total amount appropriated to June 30, 1934-----------                                            2, 237, 509. 83

   Fiscal year ending June 30                1930              1931               1932              1933              1934


Cost of new work _----         -__-.... $35, 723. 14         $19, 831. 02 ____________           __________
Cost of maintenance--___--      - __-- ___---_-_              24, 534. 69    $82, 506. 11        $183, 680. 79      $351, 928. 32

      Total cost----------------           35, 723. 14        44, 365. 71       82, 506. 11       183, 680. 79       351, 928. 32

Total expended-.----------------           38, 313. 01        52, 979. 13       78, 684. 01       145, 445. 89       394, 119. 46
Allotted      _----------------------      59, 000. 00        92, 000. 00       23, 000. 00       576, 977. 98       -3, 307. 11



Balance unexpended July 1, 1933 -----------------                 $452, 077.25
Deductions on account of revocation of allotment-----------------    3, 307. 11
      Net amount to be accounted for_    -___      ____-____-_                                                   448, 770. 14
Gross amount expended       ----------------------- $394, 153. 81
Less reimbursements collected _______-_______      _       34. 35
                                                                                                                 394, 119. 46
      Balance unexpended June 30, 1934---------------------54, 650. 68
Outstanding liabilities June 30, 1934_--------__-____- $118. 90
Amount covered by uncompleted contracts ------------    617. 95
                                                                736. 85
        Balance available June 30, 1934                          ------------------------                         53, 913. 83
Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 2 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -                  -
                                                                                                                  50, 000. 00
   1 In addition, $729,168.48 was expended from contributed funds.
   s Exclusive   sof   available funds.
         RIVERS AND HARBORS-PORTLAND,        OREG., DISTRICT    1311
                  7. TILLAMOOK BAY AND BAR, OREG.

   Location.-This bay is located on the Oregon coast about 50 miles
south of the mouth of Columbia River. (See U. S. Coast and Geo-
detic Survey Charts Nos. 5902 and 6112.)
   Previows projects.--Adopted by River and Harbor Acts of August
11, 1888, and July 13, 1892. Both the cost and expenditures were
$148,707.39, of which $77,208.92 was for new work and $71,498.47
for maintenance. For further details see page 1989 of Annual
Report for 1915.
   Existing project.-This provides for a jetty about 5,700 feet long
on the north side of the entrance; for a channel through the bar 18
feet deep and of such width as can be practically and economically
obtained; for a channel 200 feet wide and 18 feet deep from deep
water in the bay to and including a turning basin 500 feet wide and
18 feet deep in Miami Cove; and for a channel 200 feet wide and
16 feet deep from the Miami Cove Channel to Hobsonville, with a
turning basin 500 feet wide and 16 feet deep at that point, with
regulating works as needed. Mean lower low water is the plane
of reference.
   The mean of the higher high waters above the plane of reference
and the extreme tidal ranges at the entrance under ordinary condi-
tions are7.4 feet and about 11 feet, respectively.
   The estimate of cost for new work, revised in 1925, is $1,026,400,
exclusive of amounts expended on previous projects. The latest
 (1925) approved estimate for annual cost of maintenance is $25,000
for entrance and bay channels. No provision was made for main-
taining the jetty.
   The existing project was authorized by the River and Harbor Acts
of July 25, 1912, and March 4, 1913 (H. Doc. No. 349, 62d Cong., 2d
sess.); and the act of July 27, 1916, appropriated $5,000 for main-
taining the channel between Bay City and Tillamook City, but no
special report covers this item. The act of March 2, 1919, authorized
the abandonment of that portion of the project above Bay City
 (H. Doc. No. 730, 65th Cong., 2d sess.). The act of March 3, 1925,
authorized the Miami Cove and Hobsonville Channel and the aban-
donment of the Bay City Channel (H. Doc. No. 562, 68th Cong., 2d
sess.). The latest published map is in the last-mentioned document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-At Garibaldi, 3 miles from the entrance, there
is a privately owned and operated lumber-mill wharf of about 500
feet frontage.
   At Bay City, 5 miles from the entrance, there is a publicly owned
float landing for small motor boats; also, a small privately owned
wharf for small fishing boats. The terminal facilities are ade-
quate for the present commerce.
   Operations and results during fiscal year.-Maintenance dredging
of the bay channel to Miami Cove by the U. S. dredge Col. P.
Miciie was in progress for a short period during September and
                                                                    S'.
October 1933. A total of 113,188 cubic yards of sand was removed
at a cost of $0.21 per cubic yard. These operations restored the
     91536-ENG 1934-83
1312      REPORT OF CHIEF OF ENGINEERS,                U.    S. ARMIIY,    1934


bay channel to Miami Cove to project depth of 18 feet. The cost
for the year was $26,516.72 all for maintenance. The expenditures
were $20,659.40.
    Condition at end of fiscal year.-The existing project is 98 per-
cent completed. The jetty was completed to a length of 5,400 feet in
October 1917 and restored and extended to full project length of
5,700 feet in February 1933. The jetty remains at project height
except for about 300 feet at the outer end where it has been beaten
down by the sea. The 18-foot channel from the entrance to Miami
Cove was completed to project depth in April 1927, but no work
will be done on the 16-foot Hobsonville Channel until navigation
requires deeper water.
   A survey of the entrance, made in April and May 1934, shows
a controlling depth of 19 feet in a channel 200 feet wide across
the bar. From the ocean bar to the bay there is a channel along
the north jetty about 250 feet wide, with depths from 25 to 45
feet. The controlling depth in the 18-foot project bay channel to
Miami Cove was 151/2 feet. Boats drawing about 16 feet enter the
bay at high tide and proceed to the mill wharf in Miami Cove.
   The cost of the work under the existing project was $1,304,707.64,
of which $574,446.78 was for new work and $730,260.86 for main-
tenance, not including $398,832.70 for new work and $5,450 for
maintenance from contributed funds. The total expenditures have
been $1,708,905.55 of which $1,304,622.85 were United States funds
and $404,282.70 contributed funds.
   Proposed operations.-The funds unexpended June 30, 1934,
amounting to $20,791.41, will be applied as follows:
Accounts payable June 30, 1934-----------------------------------     $84. 23
Maintenance:
   Dredging bay channel with hired plant and hired labor, July to
      October 1934-------18-------------------                    1, 000. 00
    Surveys and inspections___                                     2, 000. 00

        Subtotal_                  -----------------                          20, 084. 23
Balance remaining -----------------------------------------------                 7017. 18

        Total _____     ___-----                                      --      20', 791. 41

  The sum of $18,000 can be profitably expended during the fiscal
year 1936 for maintenance dredging in the bay channel, with Gov-
ernment plant and hired labor, during August and September 1935.
                             Cost and financial summary
Cost o)f new work to June 30, 1934___________________________               $651, 655. 70
Cost o)f maintenance to June 30, 1934___________________________             801, 759. 33
      Total cost of permanent work to June 30, 1934___________ 11, 453, 415. 03
Value of plant, materials, etc., on hand June 30, 1934 .-.....---          -. 56

     Net total cost to June 30', 1934 _________________________ 1, 453,414. 47
Minus accounts payable June 30, 1934___________                         84. 23

       Net total expenditures ---         ___                              1, 453, 330. 24
Unexp )ended  balance June 30, 1934___ _________       ___      _____         20,. 791. 41
        Total amount appropriated to June 30, 1934 -------- __             1, 474, 121. 05

  1In addition $404,282.70 was expended from contributed funds.
               RIVERS              AND HARBORS-PORTLAND,                            OREG., DISTRICT                    1313

         Fiscal year ending June 30                        1930             1931       1932           1933             1934


Cost ofnew work .-----------------------               -              ---                                              ---
Cost of maintenance------------------                 $38, 541. 05   $32, 893. 02 $309, 077. 98 $257, 882. 25      1 $26, 516. 72
Total expended    -_----------------------             32, 965. 03    28, 669. 31   270, 267. 07   300, 937. 99      20, 659. 40

Allotted ............----------------------------      43, 500. 00   458, 000. 00 -82, 000. 00     186, 640. 59      27, 981. 20

  1 $6,279.90 credited to completed work account of Savannah transfer.

Balance unexpended July 1, 1933_____------__-------------------        $13, 469.61
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934      _------------------------$16, 000. 00
Amount allotted from War Department Appropriation
  Act approved July 14, 1932------------------------- 16, 700. 00
                                                                        32, 700. 00

      Amount to be accounted for_-------------------------- ___     46, 169. 61
Deductions on account of revocation of allotment------------ ------  4, 718. 80

      Net amount to be accounted for-------------------- ------- 41, 450. 81
Gross amount expended----------------------------___   $26, 998. 00
Less reimbursements collected                               338. 60
                                                         6------------------------,
                                                                         20, 659. 40

      Balance unexpended June 30, 1934-------------------------                                                   20, 791.41
Outstanding liabilities June 30, 1934                                                                                 1------------------------
                                                                                                                      117.  60
          Balance available June 30, 1934----------------------------20, 673. 81

Amount that can be profitably expended in fiscal year ending June
   30, 1936, for maintenance 1--------------                                                                      18, 000. 00

                                                    COLUMBIA         RIVER


   General description.-Thisriver rises in British Columbia, through
which it flows for 425 m les. It enters the United States in north-
eastern Washington, flows southerly to the mouth of Snake River,
thence westerly between Oregon and Washington, and empties into
the Pacific Ocean 610 miles north of San Francisco Bay and 160
miles south of the Straits of Juan de Fuca. The total length of the
river is about 1,210 miles. (See U. S. Coast and Geodetic Survey
Charts Nos. 5902, 6151, 6152, 6153, 6154, 6155, and 6146; also Geo-
logical Survey map of Washington.)
            8. COLUMBIA RIVER AT THE MOUTH, OREG. AND WASH.

  Location.-(See U. S. Coast and Geodet'c Survey Charts Nos.
5902 and 6151. For description of the Columbia River see preceding
paragraph.)
  Previous projects.-Adopted by the River and Harbor Act of
July 5, 1884. Both the cost and expenditures on this project were
$1,986,253.14, all for new work. For further details see page 1999 of
Annual Report for 1915.
  Existing project.-This provides for a channel across the bar 40
feet deep at mean lower low water, and of suitable width (not less
than one-half mile), to be secured by dredging and by converging
   1Exclusive      of available funds.
1314     REPORT OF CHIEF OF ENGINEERS, U.              S. ARMYV, 1934

rubble-mound jetties, the south jetty being about 7 miles and the
north jetty about 2     miles long, terminating 2 miles north of the
end of the south jetty. Mean lower low water is the plane of refer-
ence. The :tidal range on the bar between mean lower low water and
mean higher high water is about 8 feet and the extreme tidal range
is about 12 feet.
   The estimate of cost for new work was as follows: For the south
jetty extension, revised in 1909, $8,014,164; for the north jetty,
revised in 1913, $5,966,573; and for remodeling and operating the
dredge, made' in 1905, $250,000; a total of $14,230,737, exclusive of
amounts expended under previous projects. The latest (1928)
approved estimate for annual cost of maintenance is $6,500, to cover
the cost of hydrographic surveys only. Jetty maintenance is done
only at intervals of several years and is covered by special allotments.
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1905, made final provision for the
south jetty, the construction of the north jetty, and dredging (H. Doc.
No. 94, 56th Cong., 1st sess., and Annual Report for 1903, p. 2275).
The construction of the north jetty was approved July 29, 1910,
and a modification of its alinement December 27, 1913. The latest
published map is in the Annual Report for 1921, opposite page 1868.
   Terminal facilities.-Forterminal and transfer facilities see report
on Columbia and lower Willamette Rivers.
   Operations and results during fiscal year.-The operations con-
sisted of work on restoration of enrockment of the south jetty west-
ward from the knuckle for a distance of 4,750 feet; making hydro-
graphic and beach-erosion surveys; erecting and maintaining sand
fences on Clatsop Spit; and starting construction of a dike to stabilize
the east end of Sand Island. Under the contract for maintenance of
the south jetty, 355,371 tons of stone were placed.
   The cost of maintenance work during the year was as follows:
Maintenance of south jetty----------------------------------- $703, 250. 04
Hydrographic surveys and current observations                       , 193.53
                                                                   6--------------
Dike construction  ---------------------------------------------- 22, 611.21
Beach-erosion and sand fences----------------------------------19, 688. 52

       Total --------------------------------------------------      751, 743. 30
  The total expenditures were $592,983.65.
  Condition at end of fiscal year.-The existing project was com-
pleted in 1918 at a saving of $2,873,231 under the estimated cost.
  The inshore end of the north jetty is in good condition. On the
outer half sloughing of the enrockment into deep water along the
south side has taken place, and at the outer end for a distance of
about 1,000 feet the enrockment has been leveled down to about low
water. The jetty as a whole is in fair condition. The south jetty
has been reconstructed from Clatsop Spit to the knuckle, about 112
miles, and this part is in good condition.
  Beyond the knuckle of the jetty for a distance of 4,750 feet the
enrockiment is being restored under contract. Beyond this work
to the sea end of the jetty the old enrockment varies from about 3
feet below mean lower low water to 3 feet above, except at the outer
end, where for a distance of about three-fourths of a mile it slopes
down into deep water.
           RIVERS AND HARBORS-PORTLAND,               OREG., DISTRICT                    1315
    Survey of June 1934 shows the channel westward of the ends of
the jetties to have not less than the project depth of 40 feet at mean
lower low water for a width of 5,000 feet, and on the outer bar a
depth of 45 feet for a width of about 2,600 feet. Between the ends
of the jetties, in the vicinity of Buoy No. 6, the channel depth is
43 feet.
   In the throat, about 21/2 miles inside the ends of the jetties, the
:position of the channel has remained practically fixed, but a cutting
off of the top and easterly side of Clatsop Spit is in evidence.
    Dikes constructed and under construction along the south side of
Sand Island appear to have been effective in checking erosion along
the south side of the island, and the movement of the main channel
to the north.
    A draft of 35 feet is practicable at mean lower low water under
ordinary conditions. The cost of the existing project totaled $15,-
984,416.97 of which $11,357,506.35 was for new work and $4,626,910.62
for maintenance. The expenditures totaled $15,825,135.81. In addi-
tion, $475,000 and $25,000 were contributed by the ports of Portland
and Astoria, respectively, and expended for new work.
    Proposed operations.-The funds unexpended June 30, 1934, in-
cluding accounts receivable, amounting to $663,948.45, together with
an allotment of $56,000, made during August 1934, will be applied
as follows:
Accounts payable June 30, 1934-------------------------------     $159, 281. 16
Maintenance:
    Completion of enrockment of about 4,750 feet of south jetty
      westward from the knuckle, including trestle work, under
      contract, July to November 1934 ___________---_--__--   __   454, 000. 00
    Additional stone for maintenance of enrockment of south jetty
      between Clatsop Spit and the knuckle, under existing con-
      tract, July to November 1934 ...---                           18, 000. 00
    Completion of Dike No. 110.0 at Sand Island, under contract,
       July to September 1.934-----------------------------------                  20, 000. 00
    Stone work for Dike No. 110.0 at Sand Island, under contract,
      July to November 1934----------------------------------                      28, 000. 00
    Hydrographic surveys and other field and office work, fiscal
      year 1935 -------------------------------------------       ---               6,000. 00
                                                               --
    Beach erosion surveys and investigations, fiscal year 1935 _-                  15, 000. 00
    Building and maintaining sand fences along Clatsop Spit, fis-
      cal year 1935----------------------___  ---------------                        2,000.00
    Repairs to existing dikes and shore protection at Sand Island
      by Government plant and hired labor, March to June 1935__                    17, 000. 00

      Subtotal                                           -           281. 16     719,
                                                               7-------------------------------
                                                                     667. 29
Balance remaining---------------------------------------------

       Total --------------------------                                           719 948.45
  The additional sum of $43,000 can be profitably expended during
the fiscal year 1936, for maintenance as follows:
Maintenance:
   Repairs to dikes and shore protection at Sand Island by Govern-
      ment plant and hired labor, July, August, and September 1935___ $35, 000
    Hydrographic surveys and other field and office work, fiscal year
      1936---_-------------------- ----------------------               6, 000
    Building and maintaining sand fences along Clatsop Spit, fiscal
      year 1936                                        --------   .------------------------- 2, 000

      Total__---           --------            -         --        -----                 43, 000
1316         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                       1934

                                             Cost and financial summary
Cost of new work to June 30, 1934_ ..--------  ------------                                             1 $13,   343, 759. 49
Cost of maintenance to June 30, 1934-------------------------                                                 4, 626, 910. 62
      Total cost of permanent work to June 30, 1934_---------                                                17, 970, 670. 11
Value of plant, materials, etc., on hand June 30, 1934-----------                                                -7, 350. 24

      Net total cost to June 30, 1934__                                                                      17, 963, 319. 87
Minus accounts payable June 30, 1934_ __--                                                  -151,
                                                                                     -___-----                        930. 92

     Net total expenditures__-__-----------_----_                                                            17, 811, 388. 95
Unexpended balance June 30, 1934___ ________________--___--                                             -        663, 948. 45

           Total amount appropriated to June 30, 1934------------                                            18, 475, 337. 40


   Fiscal year ending June 30                   1930            1931                1932              1933              1934


Cost of new work---                                         --------     ----------------               -          --------------
Cost of maintenance ____________ $1, 537. 92                   $6, 247. 58     $611, 013. 73      $898, 261. 39      $751, 743. 30
Total expended ...     ..-----------------      1,939. 82       6, 014. 66       490, 158. 01    1, 018, 962. 36       592, 983. 65
Allotted         ..----
                    ....---------...-----------..-------     600, 000. 00         10, 000. 00      903, 031. 58      1, 248, 881. 82


Balance unexpended July 1, 1933_                                                                                    $8, 050. 28
Amount allotted from War Department Appropria-
  tion Act approved July 14, 1932____________--___    $30, 000. 00
Amount allotted from War Department Appropria-
  tion Act approved Mar. 4, 1933_--____--__------- 1, 220, 000. 00
                                                                                                              1, 250, 000. 00

      Amount to be accounted for___ -      __--____------------                                               1, 258, 050.28
Deductions on account of revocation of allotment             ----                                                  1, 118. 18

      Net amount to be accounted for__---                                                                - 1, 256, 932. 10
                                                                                                           1__--------
Gross amount expended --___._____---.---- -     ._                                          $603, 627. 56
Less reinbursements collected _-_---- -------------                                           10, 643. 91
                                                                                                              592, 983. 65

      Balance unexpended June 30, 1934________--------                                                             663, 948. 45
Outstanding liabilities June 30, 1934_------------                                            $1, 006. 23
Amount covered by uncompleted contracts---------                                             631, 387. 14
                                                                                                                   632,.393.,37

           Balance available June 30, 1934__-----------------------                                                 31, 555. 08

Amount that can be profitably expended in fiscal year ending June
                                       --------
30, 1936, for maintenance 2_ ___ __________________                                                               43, 000.00

                                 9. SKIPANON CHANNEL, OREG.

  Location.-This channel is a tidal waterway extending south 1.8
miles from deep water in Columbia River to the city of Warrenton,
Oreg. The channel enters the Columbia about 10 miles above its
mouth and 4 miles below Astoria., Oreg. (See U. S. Coast and
Geodetic Survey Chart No. 6151.)
  Existing prPojeot.-This provides for a channel 30 feet deep and
generally 200 feet wide extending from deep water in Columbia
River to the railroad bridge at Warrenton, Oreg., a distance of 1.8
   1 In addition $500,000 was expended from contributed funds.
   2 Exclusive of available funds.
                  RIVERS AND HARBORS-PORTLAND,                                    OREG., DISTRICT                   1317

miles, and for a turning basin 30 feet deep. The channel is to be
obtained and maintained by dredging and the maintenace of existing
bulkheads (the latter by local interests). Mean lower low water is
the plane qf reference. The tidal range between mean lower low
water and mean higher high water is about 8 feet; the extreme tidal
range is about 12 feet.
  The estimated cost of new work, made in 1928, was $135,000, with
$15,000 for annual maintenance.
  The existing project was authorized by the River and Harbor Act
of July 3, 1930 (H. Doc. N6. 278, 70th Cong., 1st sess.). This docu-
ment contains the latest published map.
  Local cooperation.-Fully complied with.
  Terminal facilities.-The city of Warrenton owns a wharf with
300-foot frontage open to the public. Three privately owned lumber
mill wharves with total frontage of 1,100 feet are used for lumber
shipments. The facilities are adequate for the present commerce.
   Operations and results during fiscal year.-Work consisted of
maintenance dredging and making hydrographic surveys. The
dredging was done by contract, 321,408 cubic yards being removed
at a cost of $21,104.20. The expenditures were $20,988.76.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1931 at a saving of $13,574 under the estimated cost. Sur-
vey.of March- 1934 showed a least channel depth of about 27 feet
at mean lower low water over the shoal outside the entrance to the
channel and 28 feet in the channel between bulkheads. The bot-
tom width is about 200 feet. A draft of 25 feet is practicable at
mean lower low water. The costs and expenditures under the exist-
ing project were $121,425.60 for new work and $21,104.20 for main-
tenance, a total of $142,529.80.
  Proposed operations.-No funds are available and no operations
are proposed for the fiscal year 1935.
  The sum;nof $15,000 can be profitably expended during the fiscal
year 1936 for maintenance dredging, by contract, during the period
August to October, inclusive, 1935.
                                             Cost and financial summary

Cost of new work to June 30, 1934_______-____   ________    $121, 425.60
Cost of maintenance to June 30, 1934_______ _______-_______   21, 104. 20

       Total cost of permanent work to June 30, 1934_________                                                  142,529. 80
Net total expenditures-- -------------------------------------                                                 142, 529.80
Total amount appropriated to June 30, 1934                                                                     1____________________
                                                                                                               142, 529. 80

    Fiscal year ending June 30                      1930          1931            1932              1933           1934


Cost of new work_____
                  .-         -           -_____________.
                                            __ - $58, 313. 85                  $63, 111. 75 _____
Cost of maintenance____-__-----------__________............                                         _      _      $21, 104. 20
Total expended------------------------23,                           611. 06     97, 814. 54         $115. 44       20,988. 76
Allotted......................-------------------------    ..   139, 000. 00   -17, 574. 40     17,988. 62          3, 115. 58
1318     REPORT     OF CHIEF       OF ENGINEERS,     U.   S. ARMY,    1934

Balance unexpended July 1, 1933------------------------------  $17, 873. 18
Amount allotted from War Department Appropriation Act approved
July 14, 1932------------------------------------------------   3, 500. 00

      Amount to be accounted for-----------------------------               21, 373. 18
Deductions on account of revocation of allotment ----------------               384.42

      Net amount to be accounted for--------------------------20, 988. 76
Gross amount expended__--------------------------------------- 20, 988. 76

Amount that can be profitably expended in fiscal year      ending June
                           - -- -- -- -- ------ ------------ ------- --
30, 1936 for maintenance 1                                             -   15, 000. 00

  10. COLUMBIA AND LOWER WILLAMETTE RIVERS BELOW VAN-
             COUVER, WASH., AND PORTLAND, OREG.

    Location.-This project embraces 1031/2 miles of Columbia River
below Vancouver, Wash., and 14 miles of Willamette River below
Portland, Oreg. For description of Columbia River see page 1313,
and of Willamette River page 1327.
    Previous projects.-Some relief dredging was done between 1866
and 1876. Projects were adopted by the river and harbor acts of
June 18, 1878; July 13, 1892; June 13, 1902; and March 3,1905. Both
the cost and expenditures on these projects were $1,529,413.14 for
new work and $1,214,864.79 for maintenance, a total of $2,744,277.93.
For further details see pages 1995 and 1998 of Annual Report for
1915.
    Existing project.-This provides for a channel 35 feet deep and
500 feet wide in the Columbia River from its mouth to the mouth of
the Willamette, 99 miles, and thence up the Willamette to Portland,
about 14 miles; 25 feet deep and 300 feet wide in the Columbia from
the mouth of the Willamette to Vancouver, Wash., 41/2 miles; and
auxiliary channels 10 feet deep and 300 feet wide in the vicinity of
Cathlamet, Wash., and 25 feet deep and 300 feet wide connecting
deep water in Willamette Slough at St. Helens, Oreg., with deep
water in the Columbia, about 2 miles, and for the construction of
stone and pile dikes and revetments. The plane of reference in the
estuary from the mouth to Harrington Point is mean lower low
water; thence to Portland and Vancouver, low water.
 .'The tidal range between mean lower low water and mean higher
high water at the mouth of the Columbia is about 8 feet, and at
Portland and Vancouver about 21/2 feet at low stages of the rivers.
Extreme tidal ranges are about 12 feet and 3 feet, respectively. An-
nual freshets have but little effect on depths at the mouth of the
Columbia; at Portland and Vancouver they average about 21 feet,
while the highest known reached a stage of 33 feet above low water.
    The estimate of cost for new work exclusive of amounts expended
on previous projects, revised in 1930, is $3,466,000, including the dike
::construction authorized in 1912 and 1922, and for a channel 35 feet
deep by 500 feet wide, but not including work contributed by the
port of Portland nor the estimate of $750,000 for a new dredge
authorized by Congress in 1922 for better maintenance, nor enlarge-
ment of the channel from the mouth of the Willamette to Vancouver,
authorized by the act of March 3, 1925, estimated to cost $123,000.
The latest (1930) approved estimate for annual cost of maintenance
is $705,000.
  1Exclusive of available funds.
          RIVERS AND   HARBORS-PORTLAND,        OREG.,   DISTRICT   1319

   The existing project was authorized by the following river and
harbor acts: The act of June 18, 1878, provided for the dike at St.
Helens Bar (Annual Report for 1877, p. 1019); the act of July 13,
1892, provided for the closing dike at head of Oregon Slough and
dikes at Deer Island and Walker Island (H. Doc. Nos. 36 and 38,
52d Cong., 1st sess.) ; the act of June 13, 1902, provided for replacing
the revetment of Coon Island (H. Doc. No. 673, 56th Cong., 1st sess.);
the act of February 27, 1911, provided for two pipe-line dredges and
accessories, and the act of July 25, 1912, provided for increasing the
main channel depth to 30 feet (H. Doc. No. 1278, 61st Cong., 3d
sess.); the act of July 27, 1916, combined the improvements below
Portland, Oreg., and between Vancouver, Wash., and the mouth of
the Willamette (without prior report); the act of August 8, 1917,
provided for Cathlamet Channel (H. Doc. No. 120, 63d Cong., 1st
sess.); the act of September 22, 1922, authorized the construction of
an additional dredge (which was not built) and accessories for better
maintenance, and the construction of contraction works (H. Doc. No.
1009, 66th Cong., 3d sess.); Public Resolution No. 105, Sixty-seventh
Congress, approved March 4, 1923, provided for the channel from
deep water in Willamette Slough to deep water in Columbia River
  (H. Doc. No. 156, 67th Cong., 2d sess.); the act of March 3, 1925,
provided for enlarged channel dimensions from the mouth of the
Willamette River to Vancouver, Wash. (H. Doc. No. 126, 68th Cong.,
1st sess.) ; the act of March 3, 1927, authorized the closing of the east
channel at Swan Island in the Willamette River, on condition that
the main channel be opened to project dimensions on the west side
of the island by the port of Portland (Rivers and Harbors Commit-
tee Doc. No. 10, 69th Cong., 2d sess.); and the act of July 3, 1930,
provided for a 35-foot channel 500 feet wide from Portland to the
sea (H. Doc. No. 195, 70th Cong., 1st sess., and Rivers and Harbors
Committee Doc. No. 8, 71st Cong., 1st sess.). For latest published
maps see House Documents Nos. 879, Sixty-third Congress, second
session; 195, Seventieth Congress, first session; and 235 and 249,
Seventy-second Congress, first session, and Rivers and Harbors Com-
mittee Document No. 6, Seventy-third Congress, first session.
    Supplementing the work authorized by Congress of a channel 28
feet deep and 300 feet wide from mouth of Willamette River to Van-
couver, Wash., with two turning basins, each generally 2,000 feet
long and 800 feet wide, and 28 feet deep, as recommended by the
Chief of Engineers in House Document No. 249, Seventy-second
Congress, first session, has been included in the Public Works pro-
gram under the National Industrial Recovery Act.
   Recommended modifications of project.-Modifications of the exist-
ing project were recommended by the Chief of Engineers as follows:
Under date of January 23, 1932, modification was recommended so
as to provide a channel 30 feet deep and 300 feet wide in the St.
Helens Channel, and a channel 30 feet deep and 500 feet wide con-
necting the upper end of the St. Helens Channel with the main ship
channel of the Columbia River, at an estimated cost of $50,000, with
$6,600 annually for maintenance (H. Doc. No. 235, 72d Cong., 1st
sess.).
  Under date of May 24, 1933, modification was recommended to pro-
vide for maintenance of depths not to exceed 35 feet at low water over
1320   REPORT OF    CHIEF OF ENGINEERS,     U.   S.   ARMY,   1934

such areas in the project channel of the Willamette River between its
mouth and the Broadway Bridge, Portland, as have been dredged
under the existing project by the port of Portland, at an additional
annual cost of $100,000 (H. Doc. No. 6, 73d Cong., 1st sess.). Further
modifications, recommended under date of February 15, 1932 (H.
Doc. No. 249, 72d Cong., 1st sess.), have been included in the Public
Works program.
   Local cooperation.-Fully complied with, except that during the
past year project depth has not been maintained in the Willamette
River.
   Terminal facilities.-At Portland, Oreg., there are under public
ownership four terminals for general cargo. There is one drydock
of 10,000 tons and another of 15,000 tons capacity, both under public
ownership and operation. Under private ownership, but open to the
public on equal terms, are 9 general cargo, 6 grain and flour, 8 lum-
ber, 8 crude oil and gasoline terminals, besides outfitting and storage
wharves.
   At Astoria, Oreg., there is a large municipal terminal with large
grain elevator and coal bunkers in connection. There are also pri-
vate wharves used for shipment of canned salmon, lumber, and flour,
and for the receiving of coal, oil, and general merchandise.
   At Vancouver, Wash., there is a municipal terminal wharf. There
are also privately owned wharves for shipment of lumber and other
commodities, and a privately owned grain elevator and wharf are
nearing completion.
   At Kalama, Wash., there is a municipal wharf.
   The port of Longview has a public terminal on the Columbia
River at Longview, Wash., and the Long-Bell Lumber Co. and
Weyerhaeuser Timber Co. have wharves in the same vicinity for the
shipment of lumber.
   At other small towns on the Columbia River between Portland and
Astoria there are sufficient private facilities to accommodate the
river steamers, and at seven points there are large sawmill docks used
entirely for the shipment of lumber in ocean-going carriers.
   These facilities, with the planned extensions, are considered ade-
quate for the present needs of commerce. (For further details see
Port Series No. 11, Corps of Engineers.)
   Operations and results during fiscal year.-With regular funds
maintenance dredging was done by the U. S. dredges Multnomah,
Wahkeiakwin, Clatsop, Mackenzie, and Michie, and the port of Port-
land dredge Clackcamas working under lease. The work was done
at all bars between Vancouver, Wash., and Flavel, Oreg., except
Henrici, St. Helens, Martin Island, and Westport bars, where no
work was necessary. The total excavation was 10,971,677 cubic
yards, and length of channel dredged 29 miles. Other maintenance
work consisted of repairs to existing dikes and revetments, repairs
to plant, surveys, and miscellaneous work with Government plant.
Under contract for construction of two dikes at Sand Island, emer-
gency relief funds work was carried on intermittently by the sureties
for the contractor. At the end of the year this work was about 67.7
percent completed.
             RIVERS AND HARBORS-PORTLAND,                                    OREG., DISTRICT                     1321
   The cost of principal classes of work was as follows:
Maintenance:
    Dredging, including surveys_______________________ ____             $453,244.85
   Dike construction __-______.______________                ____ _      101, 916. 07
   Repairs to dikes and revetments_---------------------                   7, 929. 93
   Removal of obstructions in Blind Slough (Sec. 3, River and
      Harbor Act, July 3, 1930) _--------------------------------_            486. 71
   Part of cost of transfer of dredge Savannah            __ ____ --- _   12, 537. 73
        Total, for all work___________________________________                                         576, 115.29
  Expenditures were $404,011.47, all regular funds.
  Under the Public Works program work was done under contract
on dredging a new channel at Harrington Point, and with Govern-
ment plant a 28-foot channel and two turning basins were dug at
Vancouver, Wash. Following is summary of the work.

                        Location                               Quantity         Cost        Expendi-       Percent
                                                                                              tures        complete


                                                              Cubic yards
Harrington Point_-____-_______-_______             -___        5, 261, 928 $371, 212. 59 $292, 945. 69             95. 6
Vancouver ___-____________ ______-____--
                                      _      -   __       _      879, 000     56, 983. 54    56, 983. 54          100
      Total_______ __        -______________-
                                           -- ______           6, 140, 928   428, 196. 13   349, 929. 23------


   Condition at end of fiscal year.-The 35- by 500-foot channel
project was completed in 1933, except that a channel revision is being
made with Public Works funds at Harrington Point. A total of
121 dikes have been constructed, including 5 built by the port of
Portland and 10 by the port of Vancouver.
   The channel is in good condition. A draft of 30 feet is practi-
cable at low tide throughout the year and at high tide a draft of
32 feet is practicable. In the Columbia below the mouth of Willam-
ette River the least depth referred to low-water datum at end of
June 1934 was 28 feet. At the existing stage of river the least depth
was 36 feet at low tide.
   At the mouth of Willamette River there was a small shoal with
depth of 25 feet referred to low water, which at existing river stage
gave a depth of 35 feet. In the Willamette in general a depth of
31 feet at low water is available. To Vancouver a draft of 241/2
feet at low tide is practicable from August to October, 25 feet from
November to March, and 27 feet from April to July, with corre-
sponding available river stages of 3 to 1, 1 to 4, and 4 to 7 feet,
respectively.
   The total cost of the work under the existing project was $10,108,-
606.02, of which $3,263,606.57 was for new work and $6,844,999.45
for maintenance, from regular funds, and $98,527.20 for new work
and $24,319.82 for maintenance from contributed funds. The ex-
penditures have been $10,658,461.11 from United States regular
funds and $122,847.02 from contributed funds, a total of
$10,781,308.13.
   Under the Public Works program, dredging in new channel at
Harrington Point, 32 feet deep and 500 feet wide, was nearly com-
pleted, and a channel 28 feet deep and 300 feet wide from mouth
of Willamette to Vancouver, and two turning basins were completed.
In the latter channel the least depth on June 30 was 21 feet at low
1322       REPORT     OF CHIEF      OF ENGINEERS, U.                    S. ARMY, 1934

water.      At the existing river stage the depth was 31 feet.                      The cost
was $428,196.13, for new work, and the expenditures were $349,929.23,
all from Public Works funds.
  Proposed operations.-The funds unexpended June 30, 1934, in-
cluding accounts receivable, will be applied as follows:
Accounts payable June 30, 1934-----------------------------         $34, 597.97
Maintenance:
    Dredging channel in Columbia River, with 4 Government
      dredges and hired labor and/or by contract, July 1934 to June
      30, 1935_---------------------------------_                   414, 500. 00
    Construction of Dike No. 88-5 at Harrington Point, under con-
      tract, July to September 1934_________________                 32, 500. 00
    Repairs to existing dikes, etc., by contract and/or Government
      plant and hired labor, between September 1934 and April
      1935 ------      --------------------------------------         8, 695. 95
    Construction of hydraulic laboratory model, under contract,
      at Berkeley, Calif., July to October 1934------------------    15, 000. 00
    Construction of new survey tug to replace tug Geo. H. Men-
      dell, by contract, September 1934 to, June 1935 --   ________ 240, 000. 00

      Total maintenance_ ______________________                                     745, 293.92
Balance remaining----    ---------------------------------                           81, 239. 06

                                                                                    826, 532.98
  The funds unexpended June 30, 1934, from the National Industrial
Recovery Act, will be applied as follows:
Accounts payable June 30, 1934_______________________________                 $78, 266.90
Completion of dredging contracts for Harrington Point Channel,
July 1934   ----------------------------                        ------------  18, 100. 06
      Subtotal-------------------------------------------                      96, 366. 96
Balance remaining --             -              --           --
                                                        ________       --          203. 81
       Total    --------------------------------------------                   96, 570. 77
The additional sum of $640,000 can be profitably expended, for
maintenance, during the fiscal year 1936, as follows:
Dredging channel in Columbia River, where necessary, between Van-
  couver, Wash., and the mouth, July 1935 to June 1936---------- $610, 000
Repairs to existing dikes and other works, September 1935 to April
   1936--------------------------------------------------          30, 000

          Total                   -----------------------------------                    40, 000
                                                                                        6-----------
                                Cost and financial summary
                        MAINTENANCE AND IMPROVEMENT                     FUNDS

Cost of new work to June 30, 1934___ ------------------------     $4, 793, 019. 71
Cost of maintenance to June 30, 1934__ ________--                  8, 059, 863. 84
      Total cost of permanent work to June 30, 1934                     ---------
                                                                  12, 852, 883. 55
                                                                 '-
Value of plant, materials, etc., on hand June 30, 1934__________      587, 648.16
      Net total cost to June 30, 1934_____________________        13, 440, 531. 71
Plus accounts receivable June 30, 1.934------------------------         8,932. 55
      Gross total costs to June 30, 1934____       _______-___- 13, 449, 464.26
Minus accounts payable June 30, 1934 ________-------47,                    100. 22
      Net total expenditures__-- ----------------                 13, 402, 364. 04
Unexpended balance June 30, 1934________________--_--         __      817, 600.43
      Total amount appropriated to June 30, 1934___________       14,219, 964. 47

  1 In   addition, $122,847.02 was expended from contributed funds.
  2 In   addition, $472.80 was returned to contributors.
               RIVERS. AND. H ARBORS-PORTLAND,                                                   OREG., DISTRICT                                  1323

   Fiscal year ending June 30                               1930             1931               1932                 1933                       1934


Cost of new work .___._________________ $293, 244. 94                                     $601, 448. 02         $370, 210. 46
Cost of maintenance ..........
                       -       $248,285.17 425, 718. 35                                    147, 898. 82          447, 079. 33                 $576, 115. 29
      Total cost                        284, 285.17
                         .---------------                               718, 963. 29          749, 346. 84        817, 289. 79                 576, 115. 29

Total expended--__ ------------                        380, 686, 83     605, 662. 83          686, 116. 55       .829, 019.09                  404, 011. 47
Allotted_------    _---------------                    532, 400. 00     970, 000. 00          -1, 196. 88       1, 480, 071. 37                408,496.92


Balance unexpended July 1, 1933_                                                                                                     $813, 114. 98
Amount allotted from War Department Appropria-
tion Act approved Apr. 26, 1934__________________ $595, 000. 00
Amount allotted from War Department Appropria-
  tion Act approved July 14, 1932_                       500.00
Amount allotted from War Department Appropria-
  tion Act approved Mar. 4. 1933___-- -  -    -_______   500. 00
                                                                                                                                         596, 000. 00

      Amount to be accounted for____________________________                                                                        1, 409, 114.98
Deductions on account of revocation of allotment-______
                                                  --    -187,                                                                               503. 08

      Net amount to be accounted for ____________________--_ 1, 221, 611. 90
Gross amount expended____________________________     $742, 137. 53
Less
     Reimbursements collected---------- $215, 131. 18
     Receipts from sales--________ _ 122, 994. 88
                                                       338, 126. 06
                                                                    404, 011. 47

          Balance unexpended June 30, 1934 ________                                                    ________          _               817, 600. 43
Outstanding liabilities June 30, 1934----------------                                                   $65, 070. 27
Amount covered by uncompleted contracts----------                                                       104, 413. 55
                                                                                                                                         169, 483. 82

      Balance available June 30, 1934____________________------648, 116. 61
Accounts receivable June 30, 1934_________________________--       8, 932. 55

          Unobligated balance available June 30, 1934 _____________                                                                      657, 049. 16
Amount that can be profitably expended in fiscal year ending June
  30, 1936, for maintenance __________________________________                                                                           640, 000. 00
                                                            PUBLIC     WORKS,       FUNDS


Cost of new work to June 30, 1934____________________________                                                                        $428, 196. 13
Cost of maintenance to June 30, 1934___________
          Total cost of permanent work to June 30, 1934___________                                                                       428, 196. 13
Minus accounts                payable June 30,                        1934_________________                                              78, 266. 90
          Net total expenditures___________________________                                                                              349, 929.23
Unexpended balance June 30, 1934_                                                                                                            96, 570. 77

          Total amount appropriated to June 30, 1934___                                                                         -        446, 590. 00


          Fiscal year ending June 30                                  1930             1931              1932               1933                   1934


Cost of new work .                    .
                                      --...         -....                                                                            -    -    $428, 196. 13
Cost of maintenance,                     ------.
                                                                                                         ------- ---
                                      .
Total expended_              ___
                                ---------                                                                                                       349, 929. 23

Allotted__--------------------                                                                                             -                   446, 500. 00

    1 Exclusive of available funds.
1324      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                             19 3 4

Amount allotted from National Industrial Recovery Act approved
  June 16, 1933-------------------------------------------- $446, 500.00
Gross amount expended--- -------------             $350, 087. 51
Less reimbursements collected ----------------           158. 28
                                                                 349, 929. 23

     Balance unexpended June 30, 1934-------------------------                                        96, 570. 77
Amount covered by uncompleted contracts__---------------------                                        95, 304. 31

       Balance available June 30, 1934____--------                                -                      1,266.46

CONSOLIDATED COST AND FINANCIAL SUMMARY FOR COLUMBIA AND LOWER WILLAMETTE

Cost of new work to June 30, 1934_______________________                                        $5, 221,215., 84
Cost of maintenance to June 30, 1934 ______________------8,                                         059, 863. 84

      Total cost of permanent work to June 30, 1934                     ----------              13, 281, 079. 68
Value of plant, materials, etc., on hand June 30, 1934                   ---------                 587, 648. 16

      Net total cost to June 30, 1934111
                                      .....                                            1        13, 868, 727. 84
Plus accounts receivable June 30, 1934--------------                                                  8,932. 55

      Gross total costs to June 30, 1934___________________-                                    13, 877, 660. 39
Minus accounts payable June 30, 1934-------------------------                                       125, 367. 12

      Net total expenditures ___________________--__      ___-13, 752, 293.27
Unexpended balance June 30, 1934-------------------------         914, 171.20
        Total amount appropriated to June 30, 1934------------214, 666, 464. 47

   Fiscal year ending June 30        1930            1931            1932                1933               1934


Cost of new work_____________
                  .................               $293. 244. 94   $601, 448. 02       $370, 210. 46       $428, 196. 13
Cost of maintenance_      _   $284, 285. 17        425, 718. 35    147, 898. 82        447, 079. 33        576, 115. 29

     Total cost-----------------   284, 285. 17    718, 963. 29    749, 346. 84        817, 289. 79      1, 004, 311. 42

Total expended------------------   380, 686. 83    605, 662. 83    686, 116. 55        829, 019. 09        753, 941. 70

Allotted ....-------------         532, 400. 00    970, C00. 00    -1, 196.88     1, 480, 071. 37          854, 996. 92


Balance unexpended July 1, 1933_,_-.__                                                            $813, 114. 98
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934--------------------$595,                             000. 00
Amount allotted from War Department Appropriation
  Act approved July 14, 19d32__ _____________ ____                                500. 00
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933-------- ----------------                              500. 00
Amount allotted from National Industrial Recovery
  Act approved June 16, 1933_-          ---
                                      _____________  446,                         500. 00
                                                                                                 1, 042;, 500. 00
      Amount to be accounted for__________________     ________ 1, 855, 614.98
Deductions on account of revocation of allotment ----------------  187, 503. 08
      Net amount to be accounted for------------------------ 1, 668, 111. 90
Gross amount expended------------------------- $1, 092, 225. 04
Less:
    Reimbursements collected- --.---- $215, 289.46
    Receipts fIom sales_____________ 122, 994. 88
                                                   338, 284. 34
                                                                753, 940. 70
        Balance unexpended June 30, 1934-.- -                                                     -914, 171. 20
   SIn addition, $122.847.02 was expended from contributed funds.
   2 In addition, $472.80 was returned to contributors.
          RIVERS AND HARBORS-PORTLAND,             OREG., DISTRICT           1325
Outstanding liabilities June 30, 1934-----------      $65, 070. 27
Amount covered by uncompleted contracts-              190,  717. 86
                                                      1-------
                                                                      $264, 788. 13

      Balance available June 30, 1934---------------------__           649, 383. 07
Accounts receivable June 30, 1934------------------------------          8, 932. 55

      Unobligated balance available June 30, 1934_--------------       658, 315. 62

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance___----------------------------------        640, 00. 00

                       11. CLATSKANIE RIVER, OREG.

   Location.-This river rises in the Coast Range in Oregon, flows
northwesterly about 28 miles, and empties through Beaver and Wal-
lace Sloughs into the Columbia River about 47 miles from the mouth.
 (See U. S. Coast and Geodetic Survey Chart No. 6152.)
   Previous projects.-Adopted by River and Harbor Act of March
3, 1899. The total cost and expenditures were $39,026.29, of which
$15,537.30 was for new work and $23,488.99 was for maintenance.
For further details of original project, see page 2000 of Annual
Report for 1915.
   Existing project.-This provides for dredging and maintaining a
through channel 6 feet deep and 40 feet wide from the town of Clats-
kanie to Columbia River, a distance of about 4 miles. Low water
is the plane of reference. The variation of water levels due to tides
is about 4 feet and to freshets in the Columbia River about 10 feet.
   The estimate of cost for new work, made in 1915, was $4,620. The
latest (1924) approved estimate for annual cost of maintenance is
$7,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 3, 1899, provided for improvement
below Clatskanie (H. Doc. No. 218, 55th Cong., 2d sess.); the act of
June 25, 1910, provided for dredging from Clatskanie to the railroad
bridge (H. Doc. No. 633, 61st Cong., 2d sess.) ; the act of July 18,
1918, provided for the maintenance from the mouth to Clatskanie
without: prior printed report; and the act of September 22, 1922,
provided for improvement and maintenance from the town of Clats-
kanie to the Columbia River (H. Doc. No. 698, 64th Cong., 1st sess.).
The latest published map is in the last-mentioned document.
   Terminal facilities.-A wharf and a warehouse at Clatskanie are
owned by a transportation company. On Beaver Slough there are
five private wharves which have regular steamboat service. The
terminal facilities are adequate for existing commerce.
   Operations and results dring fiscal year.-Dredging by contract
between the town of Clatskanie and the Columbia River was com-
pleted in October 1933. A total of 6,953 cubic yards of material was
removed from the channel, at a cost of $2,180.19, all for maintenance.
The channel was restored to project dimensions, 6 feet deep and 40
feet wide on the bottom. The expenditures were $2,117.66. The
operations resulted in maintainiing the project depth and width be-
tween the town of Clatskanie and the Columbia River.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1924 at a saving of $917 under the estimated cost. The
  1Exclusive of available funds.
1326         IEPORT       OF CHIEF OF ENGINEERS, U. S. ARMY,                                                      1934

channel is in fair condition, with project width and depth available,
except near the junction of Clatskanie River with. Beaver Slough
and near the town of Clatskanie, where shoals with a controlling
depth of about 3 feet at low water have formed since dredging was
completed. Cost of the existing project was $46,094.87, of which
$3,703.34 was for new work and $42,391.53 for maintenance. The
expenditures were $46,080.27.
  Proposed operations.-The funds unexpended June 30, 1934,
amounting to $1,930.89 will be applied to maintenance as follows:
Accounts payable June 30, 1934 -- ___---__-____-__________-____      $4. 60
Contract dredging between the mouth of the river and the town of
  Clatskanie, in August 1934                                        926.29
                                                                 1---------------------------

          Total-------------------------------------------------                                                      -- 1, 930.89
  The sum of $4,000 can be profitably expended during the fiscal
year 1936 for maintenance dredging between Clatskanie and the
Columbia River, by contract, July 1 to, August 15, 1935.
                                         Cost and financial summary

Cost of new work to June 30, 1934----------------------------                                                           $19, 240. 64
Cost of maintenance to June 30, 1934________________------------                                                          65,880. 52
      Total cost of permanent work to June 30, 1934_ -      ____-----                                                       85, 121. 16
Value of plant, materials, etc., on hand June 30, 1934 --- __-----                                                         --    10.00
      Net total cost to June 30, 1934                                                                                      85, 111. 16
Minus accounts payable June 30, 1934______-- _____--------4.60
     Net total expenditures------------------------------------85, 106. 56
Unexpended balance June 30, 1934______________________-----       1,930. 89

          Total amount appropriated to June 30, 1934                                                                        7, 037.45
                                                                                                                           8________________

          Fiscal year ending June 30                       1930              1931               1932           1933             1934


Cost of new work....             ---------
Cost of maintenance-------------------                  $2, 615. 82      $2, 057. 78         $2, 766.03      $1, 538. 42      $2,180. 19
Total expended----.--------------------                  2, 615. 82        2, 057. 78          2, 766. 03     1, 586. 35       2, 117. 66

Allotted.....----------   ----------------                    00. 00 ------------              -323. 74       5, 655. 14         -20. 24



Balance unexpended July 1, 1933_________________________________                                                           $4, 068. 79
Deductions on account of revocation of allotment-----------------                                                               20. 24

                                         -
      Net amount to be accounted for- -----------------    ____--4,                                                           048. 55
Gross amount expended __---------------------------------_          _                                                       2,117. 66
      Balance unexpended June 30, 1934_________________________                                                             1,930. 89
Outstanding liabilities June 30, 1934   1111111                                                                                 4. 60
          Balance available June 30, 1934 ___._________                                             ______         __       1, 926. 29

Amount that can be profitably expended in fiscal year ending June
                                             - - - - - - - - - - - - - - - - - -    - - - - - - -
   30, 1936, for maintenance                    _                                                                           4, 000. 00

   1Exclusive      of available funds.
           RIVERS   AND, HARBORS-PORTLAND,      OREG.,   DISTRICT'    1327

12. WILLAMETTE RIVER ABOVE PORTLAND AND YAMHILL RIVER,
                         OREG.

   Location.-The Willamette River rises in the Cascade Range in
southwestern Oregon, flows northerly, and empties into the Columbia
River about 100 miles from the sea. Its length from the source of
-the middle fork is about 294 miles. (See U. S. Coast and Geodetic
Survey Chart No. 6155 and the U. S. Geological Survey Map, State
of Oregon.)
   The Yamhill River rises in the Coast Range, flows easterly, and
empties into the Willamette River about 42 miles above Portland.
Its length from the source of the south fork is about 52 miles.
   Previous projects.-For the Willamette River adopted by the
River and Harbor Acts of March 3, 1871, and July 13, 1892. Both
the cost and expenditures thereunder were $247,747.51 for new
work. For further details see page 1997 of Annual Report for
1915.
   Existing project.-This provides for improvement of Willamette
River between Portland (14 miles above the mouth) and Oregon
City (26 miles above the mouth) by a channel 8 feet deep at low
water, 200 feet wide below Cedar Island, and 150 feet wide thence
to Oregon City; and for a channel 21/2 to 31/2 feet deep at low
water and of no prescribed width from Oregon City to Corvallis
 (132 miles above the mouth); by snagging between Corvallis and
Harrisburg (163 miles above the mouth) ; by the removal of Copeleys
Rock, 9 miles above Portland, and by necessary dredging, snagging,
dike, and revetment work between Portland and Corvallis. The
project also provides for a channel in Yamhill River 4 feet deep at
low water and 60 feet wide from its mouth to McMinnville (18
miles) to be secured by means of a lock and dam near Lafayette
and the removal of obstructions. The section of Willamette River
in the vicinity of Willamette Falls at Oregon City is covered by a
project described on page 1331 of this report.
   Lock and dam on Yamhill River:
   Location: 11/2 miles from Lafayette, Oreg., 8 miles above the mouth.
   Usable lock dimensions: One lock, 175 by 40 feet.
   Lift of lock: 16 feet.
   Depth on sills at low water: 4 feet on upper sill; 2 feet on lower sill.
   Character of foundation: Timber piling in clay.
   Kind of dam: Fixed.
   Type of construction: Timber crib.
   Date of completion: September 21, 1900.
   Cost : $72,164.83.
   For the Willamette River below the falls at Oregon City ordinary
fluctuation of stage of water is 15 feet and the extreme fluctuation
due to flood conditions 35 to 50 feet.    Above Oregon City the ordi-
nary fluctuation is 12 to 20 feet and the extreme is 20 to 27 feet.    For
the Yamhill River the ordinary fluctuation is 35 feet and the ex-
treme 48 feet. Tidal changes vary from about 21/2 feet at the mouth
of the Willamette to zero 26 miles above the mouth.
   The estimate of cost for new work, revised in 1930, is $459,300,
exclusive of the amount expended on previous projects. The latest
 (1932) approved estimate for anniual cost of maintenance is $80,000.
     91536-0   No 1934-84
1328   REPORT OF CHIEF OF ENGINEERS,        U.   S. ARMY,   19 3 4

   The existing project was adopted by the following river and har-
bor acts: The act of June 3, 1896, provided for the improvement of
Willamette River above Oregon City (H. Doc. No. 260, 54th Cong.,
1st sess., and Annual Report for 1896, p. 3309) and Yamhill River
 (Annual Report for 1895, p. 3602); and the act of July 25, 1912,
provided for a 6-foot channel in the Willamette River below Oregon
City (H. Doc. No. 438, 62d Cong., 2d sess.). The project was modi-
fied in 1904 by abandoning the 20-mile stretch of the river between
Harrisburg and Eugene as unworthy of improvement (Annual Re-
port for 1904, p. 3529) ; and the act of July 3, 1930, provided for the
8-foot channel (H. Doc. No. 372, 71st Cong., 2d sess.). For latest
published map see the last-mentioned document.
   Terminal facilities.-Between Portland and Willamette Falls the
terminals are privately owned mill wharves and oil-receiving sta-
tions. Above the falls there are small wharves privately owned or
natural landings. These facilities are considered adequate for the
existing commerce.
   Operations and results during fiscal year.-New work on the
8-foot channel of Willamette River between Portland and Oregon
City, Oreg., consisted of the removal of 371,789 cubic yards of ma-
terial, chiefly gravel, by contract, at a cost of $71,303.55, which in-
cludes the construction of a gravel dike at the mouth of Clackamas
River with a part of the dredged material; the modification of locks
at Willamette Falls (Oregon City), and lower lock approach, con-
sisting of lowering floor of Lock No. 1 and lock approach; construc-
tion of new gates and miter sill at the lower end of Lock No. 1;
retimbering lock lining; constructing emergency cofferdam recess,
and riprapping gravel dike at mouth of Clackamas River, by con-
tract, at a cost of $82,258.59. The 8-foot channel project is 95 per-
cent complete.
   Maintenance dredging in Willamette River between Portland and
Independence, Oreg., and in Yamhill River, consisted in the re-
moval of 323,105 cubic yards of material, mostly gravel, by the U. S.
dredge Monticello and the U. S. derrick barge No. 41, at a cost of
$46,165.97, and 235,033: cubic yards by hired dredges at a cost of
$35,881.68, and 18,510 cubic yards by contract at a cost of $4,601.53.
Other maintenance work consisted of the removal of 1,404 snags
from Willamette and Yamhill Rivers at, a cost of $9,550.80; the con-
struction of 405 linear feet of pile and timber dike at a cost of
$3,421.39. Repairs were made to existing dikes at a cost of $1,249.26.
Surveys were made before dredging of, all bars between Portland
and Independence, and Yamhill River at a cost of $7,825.19.
   These operations resulted in maintaining the project depths of 21/2
and 31/2 feet at low water between Oregon City and Independence
and in Yamhill River, and 8-foot depth between Portland and
Oregon City.
   The total cost was $262,616.99, of which $153,562.14 was for new
work and. $109,054 85 for maintenance. TheftotaL expenditures were
$258,342.99.
   Condition at end of fiscal year.-The existing project is about 95
percent completed. The new work on the 8-foot channel, Portland
to Oregon City, is about 95 percent completed. Removal of Copeleys
Rock will complete the existing project. The controlling depths at
           RIVERS AND IIARBORS-PORTLAND,                 OREG., DISTRICT          1329
low water on upper Willamette River at the end of the year were:
8 feet between Portland and Oregon City (13 miles); 3 feet from
Oregon City to Independence (72 miles), and on Yamhill River, 2
feet from its mouth to McMinnville (18 miles). Traffic above Salem
is confined to log rafts and occasional launches. The river is open
between Salem and Corvallis (47 miles), but the steeper slope of the
river above Corvallis discourages traffic. The controlling depth be-
tween Salem and Corvallis is about 1 foot at low water.
   The bank revetment at Independence and the dam and revetment
at Wheatland are all in fair condition. One lock and dam in Yam-
hill River was completed in 1900 (see table under Existing project).
For condition of lock and dam at the end of the fiscal year, see page
1333.
  The total cost of the existing project was $1,710,736.67, of which
$437,606.35 was for new work and $1,273,130.32 for maintenance.
The total expenditures were $1,779,958.79.
  Proposed operations.-The funds unexpended June 30, 1934, will
be applied as follows:
Accounts payable June 30, 1934____---------------------------------          $5. 972. 94
New work: Removal of Copeleys Rock by contract, September and
  October 1934                                                                   500. 00
                                                                              6---------------------------
Maintenance :
    Contract dredging between Portland and Oregon City, Oneg.,
      July and August 1934------------------------------------               16,000. 00
    Dredging by Government plant and hired labor, between
      Portland and Independence, Oreg., and in Yamhill River,
      4 months July and August 1934 and May and June 1935____                22, 000. 00
    Dredging by hired plant, between Oregon City and Inde-
      pendence, Oreg., July and August 1934 and May 1935-------              25, 000. 00
    Repairs to existing dams and dikes with Government plant
      and hired labor, August and September 1934---------------               4,000. 00
    Repairs to fish ladder near Oregon City, Oreg., by Govern-
      ment plant and hired labor, August 1934------------------__ ___         3, 500. 00
    Surveys before and after dredging, with Government plant and
      hired labor, between Portland and Independence, Oreg ---                6,000. 00
    Snagging with Government plant and hired labor, between
      Portland and Harrisburg, Oreg., July-September 1934 and
      April-June 1935_------------------------------------------              5,632. 59
    Cdonstructionb   of new quarterboat to replace quarterboat
      No. 3      ----------------------------------------------               8,500. 00

        Total maintenance ---------------------------------------            96, 605. 53
        Total new work and maintenance-------------------------103, 105. 53
        Balance remaining----------------------------------------3, 062. 58
        Total -------------------------------------------------             106, 168.11
   The additional sum $80,000 can be profitably expended during the
fiscal year 1936, as follows:
Maintenance:
    Construction and repairs, dikes, dams, and revetments in Wil-
      lamette River, between Newberg and Independence, by contract,
      Julyi to:ept.       30, 195, and -Apr.' 1 to- June 30, 1936------------_  $10,000
   Dredging in Willamette River between Portland and Independence,
      and in Yamhill River with Government plant and hired labor,
      July 1 to Sept. 30, 1935, and Apr. 1 to June 30, 1936------------          15,000
   Dredging in Willamette River between Portland and Oregon City,
      by contract July 1 to Aug. 31, 1935_ --            ___-_-------            10, 000
   Dredging in Willamette River, between Portland and Independence,
       by hired plant, July 1 to Sept. 30, 1935, and Apr. 1 to June
      30, 1936 ----------------------                                 -     ___  15, 000
1330          IREPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                  1934

Maintenance :-Continued
    Dredging in Willamette River, between Newberg and Salem, by
      contract July 1 to Sept. 30, 1935--------------------------- -                                                15, 000
    Snagging, by Government plant and hired labor, between Portland
      and Harrisburg, July 1, 1935, to June 30, 1936 -----------------                                               7, 500
    Surveys, Willamette River between Portland and Independence
      and Yamhill River, July 1 to Oct. 31, 1935, and Apr. 1 to
      June 30, 1936----------------------------------                                                                7, 500
          Total for all work--------------------------------                                          --           80, 000

                                            Cost and financial summnary

Cost of new work to June 30, 1934                            -------------------------     $685, 353. 86
Cost of maintenance to June 30, 1934                               ---------------------- 1, 273, 130. 32

      Total cost of permanent work to June 30, 1934----------__ 1, 958, 484. 18
Value of plant, materials, etc., on hand June 30, 1934-----------   75, 148. 46

      Net total cost to June 30, 1934------------------ ----- 2, 033, 632. 64
Plus accounts receivable June 30, 1934-------------------------       221. 60

     Gross total costs to June 30, 1934--------------------2, 033, 854. 24
Minus accounts payable June 30, 1934                              , 147. 94
                                                                6-------------------------

     Net total expenditures----------------------------- 2, 027, 706. 30
Unexpended balance June 30, 1934--------------------------105, 946. 51
            Total amount appropriated to June 30, 1934-------------                                        2, 133, 652. 81

    Fiscal year ending June 30                  1930           1931             1932           1933                1934


Cost of new work ._............._____.---          ----       $4, 241. 47     $7, 510. 41    $22,990.90          $153,562.14
                      .....------
Cost of maintenance----                      $103, 432. 06    92, 563. 36    144, 950. 78     83, 220. 29         109, 054. 85

       Total cost.........-------------------------.....      96, 804. 83    152, 461. 19    106, 211. 19         262, 616. 99

Total expended---------------                  89, 488. 39   129, 220. 39    167, 462. 42    108, 444. 86         258, 342. 99

Allotted_            -       __ _ __ __       232, 000. 00   85, 000. 00       24, 000. 00   355, 253. 32          94, 723. 28


Balance unexpended July 1, 1933                                             __----------                   $269, 566. 22
Amount allotted from War Department Appropria-
tion Act approved Apr. 26, 1934------------------ $62, 000. 00
Amount allotted from War Department Appropria-
Act approved Mar. 4, 1933------------------------ 51, 300. 00
                                                                                                             11.3, 300. 00
      Amount to be accounted for__------------------------                                                   382, 866. 22
Deductions on account of revocation of allotment----------------                                              18, 576. 72
      Net amount to be accounted for         ------------------                                              364, 289. 50
Gross amount expended---- ----- ----------------- $267, 600. 70
Less reimbursements collected--_---------------------       266. 71
                                                                                                      -      258, 342.99
      Balance unexpended June 30, 1934----------------------            105, 946. 51
Outstanding liabilities June 30, 1934---------------- $29, 334. 63
Amount covered by uncompleted contracts                     75. 00
                                                           1------------
                                                                         29, 509. 63
      Balance available June 30, 1934--------------------------          76, 436. 88
Accounts receivable June 30, 1934                                             21. 60
                                                                             2------------------------
      Unobligated balance available June 30, 1934---------------         76, 658. 48
Amount that can be profitably expended in fiscal year ending June
                            _
30, 1936, for maintenance --      --                                                                         80, 000. 00
   1Exclusive of available funds.
            RIVERS AND HARBORS-PORTLAND,                    OREG., DISTRICT          1331
13. OPERATING AND CARE OF CANAL AND LOCKS AT WILLAMETTE
                       FALLS, OREG.

  Location.-Willamette Falls is formed by a rocky reef in the
Willamette River at Oregon City, Oreg., about 26 miles above the
mouth of the river. For description of Willamette River see page
1773, Annual Report for 1932.
  Existing project.-This provides for the purchase, rehabilitation,
and deepening to 6 feet at low water of the existing canal and locks
and the separation of the canal from the water-power intake by the
construction of a concrete division wall.
                        LOOKS AND DAM ON WILLAMETTE RIVER

  Location: At Willamette Falls, near Oregon City, Oreg., 26 miles above the
mouth.
  Usable lock dimensions: Series of four locks, each 175 by 37 feet.
  Lift of each lock: Lock No. 1 (lower), 22.5 feet ;2 Lock No. 2, 8.7 feet; Lock
No. 3, 10.9 feet; Lock No. 4 (upper), 8.1 feet.
  Depth on miter sills at low water: Lower lock, 8.4 feet; upper lock, 6 feet.
  Character of foundation: Rock.
  Kind of dam: Fixed.
  Type of construction: Concrete.
  Year of completion: 1873. Purchased by United States April 26, 1915.
  Cost: Unknown. Purchase price, $375,000.
   The ordinary fluctuation of the stage of water above the locks is
12 feet, and the extreme, due to flood conditions, 20 feet. Below the
locks the ordinary fluctuation is 15 feet and the extreme 50 feet.
   The estimate of cost for new work, made in 1912, was $680,000.
This includes the price paid for the canal and locks.
   The existing project was authorized by the following river and
harbor acts: The act of June 25, 1910, provided for the purchase and
rehabilitation of the system and the construction of the concrete divi-
sion wall (H. Doc. No. 202, 56th Cong., 1st sess., and Annual Report
for 1900, p. 4374), and the act of August 8, 1917, provided for the
deepening of the locks (H. Doc. No. 1060, 62d Cong., 3d sess.). The
last-mentioned document contains the latest published map.
   Local cooperation.-Fullycomplied with.
   Terminal faiities.-The Crown Willamette Paper Co. has con-
structed a timber wharf about 850 feet in length, extending to and
supported by the concrete division wall built in the lock canal by the
United States. This wharf is used mainly for the shipment of their
products and receipt of material and supplies.
   Operations and results during fiscal year.-Repairs to and general
policing and care of the property resulted in continuous service dur-
ing the year, excepting when modification of Lock No. 1, under the
8-foot channel, Portland to Oregon City, was being done. The costs
for the year were $28,080.99, all for maintenance. Expenditures for
the year for maintenance, under allotments from permanent indefi-
nite appropriation, were $28,267.92.
   1A guard lock 210 by 40 feet, which is used only at higher stages of water, is located at
the upper end of the canal basin.
   "A concrete division wall, 1,227 feet long, extending from Lock No. 4 to the guard
lock, separates the upper basin of the canal from the headrace, which formerly led
directly from the basin and supplied water for the power plants operated by the Crown
Willamette Paper Co. and the Portland Railway, Light & Power Co.
   * The dam is owned by private parties.
1332       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

   Condition at end of fiscal year.-The final report on the project
for purchase and rehabilitation of the canal and locks was given in
the annual report for 1923, when the project was reported 98 percent
complete. No further work is considered necessary. The depth
over the miter sills is 6 feet at low water. The locks and grounds
are in fair condition and are continuously serviceable, except when
high water or necessary repairs prevent.
   Expenditures for purchase and rehabilitation of the locks and
canal were $677,122.20, of which $300,000 was from contributed
funds. Costs for maintenance from the permanent indefinite appro-
priation was $415,009.46. Expenditures were $416,459.07.
   Proposed operations.-The canal will be operated and maintained
under allotments from appropriations made available for such
purposes.
       Cost and financial summary for maintenance and improvement funds
Cost of new work to June 30, 1934---------------------------- $377, 122. 20
Cost of maintenance to June 30, 1934------------------------------------
      Total cost of permanent work to June 30, 1934------------                                   377, 122. 20
Net total expenditures ------------------------------------                                       377, 122. 20
Total amount appropriated to June 30, 1934__                                                      377, 122. 20

               Cost and financial summary for operating and care funds
Cost of maintenance to June 30, 1934---------------------------$415, 009. 46
Value of plant, materials, etc., on hand June 30, 1.934 . -.. ---  3, 157. 92

     Net total cost to June 30, 1934---------------------------418, 167. 38
Minus accounts payable June 30, 1934---------------------------   1, 708. 31

     Net total expenditures -----------------------------------                                   416, 459. 07
Unexpended balance June 30, 1934------------------------------                                      3, 408.29

        Total amount appropriated to June 30, 1934----------------                                419, 867. 36

        Fiscal year ending June 30              1930          1931          1932          1933         1934

Cost of new work--------_---------          -------------------------------------------
Cost of maintenance------------------- $38, 062. 09 $29, 381. 26 $31, 952. 37 $27, 405. 92 $28, 080. 99
Total expended. -     -------------------- 39, 247. 81      28, 007. 54   33, 813. 51   27, 907. 86   28, 267. 92
Allotted-------......------------..--------
                    ..                        35, 000. 00   30, 000.00    35,000. 00    32, 671.94    21, 191. 12


Balance unexpended July 1, 1933-------------------------------      $10, 485.09
Amount allotted from permanent indefinite appropriation, section 6,
River and Harbor Act, March 3, 1909-------------------------- 22, 500. 00

     Amount to be accounted for------------------------------32, 985. 09
Deductions on account of revocation of allotment----------------- 1, 308. 88

        Net amount to be accounted for---------------------------31, 676. 21
   1In addition, $300,000 was expended from contributed funds.
          RIVERS AND       HARBORS-PORTLAND,            OREG.,   DISTRICT       1333
Gross amount expended__________________________    $29, 339. 43
Less reimbursements collected__________-__   _____   1, 071. 51
                                                                          $28, 267. 92
      Balance unexpended June 30, 1934___._______--.......                   3,408.29
Outstanding liabilities June 30, 1934___________________________             1, 899. 81
    Balance available June 30, 1934____________________-                     1, 508. 48
Amount allotted for fiscal year 1935-_______ ____________-__                36, 000. 00
      Balance available for fiscal year 1935 _____________           __     37, 508. 48

14. OPERATING AND CARE OF LOCK AND DAM IN YAMHILL RIVER,
                          OREG.

   The improvement for which report is made under this caption
forms part of the project for Willamette River above Portland and
Yamhill River, Oreg. See pages 1327 to 1330 where general infor-
mation regarding the improvement can be found. The completed
lock and dam has been operated and maintained under the permanent
indefinite appropriation since September 24, 1900.
   Terminal facilities.-A country road, in good condition, leads from
Lafayette, 11/2 miles, to the locks. There are no terminal facilities
on the river nor at the locks.
   Operations and results during fiscal year.-Minor repairs were
made to the lock, dam, and buildings, policing of grounds, and care
of operating machinery. The work was done by hired labor at
a cost of $3,111.42. Expenditures for the year for maintenance,
under allotments from permanent indefinite appropriation, totaled
$3,103.24.
   Condition at end of fiscal year.-The depth over the upper lock
miter sill at low water is 4 feet, and 2 feet over the lower miter
sill. The lock, dam, and grounds are in fair condition. The lock
gates are in poor condition. The lock was in service the year
around, except for short periods during high-water stages, and is
used principally for the passage of log rafts. (For further details
see table, p. 1327.) Costs for maintenance, from the permanent
indefinite appropriation, were $94,025.66. Expenditures were
$93,973.61.
   Proposed operations.-The canal will be operated and maintained
under allotments from appropriations made available for such pur-
poses.
                            Cost and financial summary
Cost of maintenance to June 30, 1934 _________________________ $94, 025. 66
Value of plant, materials, etc., on hand June 30, 1934______________ -5.00

     Net total cost to June 30, 1934_____________________________           94, 020. 66
Minus accounts payable June 30, 1934 ___________________--      __               47. 05

     Net total expenditures ________------------------93,                       973.61
Unexpended balance June 30, 1934_______________---                              280. 90
       Total amount appropriated to June 30, 1934________________           94, 254. 51
1334       REPORT        OF CHIEF OF ENGINEERS,                          U.    S. ARMY,          1934


        Fiscal year ending June 30              1930             1931           1932          1933            1934

Cost of new work-----         -         -        -            -------
Cost of maintenance------
                  .... ----------------         919. 80
                                              $3,              $1, 458. 78    $2, 209. 13   $6, 855. 67      $3, 111. 42

Total expended---.-      .                      3, 904. 87
                                     .--------------------      1, 470. 59     2, 214. 38    6, 916. 80       3, 103. 24

Allotted--------------    ----------------     3, 900. 00       3, 000. 00     6, 000.00     1, 578. 73       3, 088. 33


Balance unexpended July 1, 1933                 _      ----                     --------                    $295. 81
Amount allotted from permanent indefinite appropriation, section
6, River and Harbor Act, Mar. 3, 1909---------------------------                                          3, 200. 00

        Amount to be accounted for------------------__-------                                              3, 495. 81
Deductions on account of revocation of allotment-------------------                                          111. 67

      Net amount to, be accounted for---------                  3, 384. 14
Gross amount expended-----------------------------------------3, 103.24

      Balance unexpended June 30, 1934 ---------------------------                                           280. 90
Outstanding liabilities June 30, 1934-------------------------------                                          86. 38
     Balance available June 30, 1934-----------------------------     194. 52
Amount allotted for fiscal year 1935------------------ ---        15, 600. 00

Balance available for fiscal year 1935-------------------------                                           15, 794. 52

                15. COLUMBIA RIVER AT BONNEVILLE, OREG.

   Location.-On the Columbia River, 42 miles east of Portland,
Oreg., about 144 miles above the mouth of the river. For descrip-
tion of the Columbia River see page 1313 of this report.
   E0is'ting project.-No work has been authorized by Congress.
The project authorized by the Federal Emergency Administration of
Public Works provides for acquisition of necessary lands and con-
struction of a dam, power plant, and lock, for power and navigation.
The work consists of a gravity type concrete spillway dam, 1,200
feet long, 165 feet wide at the base, surmounted by eighteen 50-
by 50-foot movable crest steel gates, across the main river channel
from the Washington shore to Bradford Island which divides the
river at this point; a power house, with initial installation of two
units of 43,000 kilowatts each (ultimate installation, 10 to 12 units)
across Bradford Slough to the Oregon shore; and a single lift ship
lock with clear dimensions of 76 feet in width, 500 feet in length,
and 27 feet over the sills. The lift at low water and normal pool
level is 66 feet. Elevation of the roadway over the spillway dam is
99 feet above sea level. The lock and power house will be con-
structed on andesite foundation, and the main dam will rest upon
solidified sedimentary rock of volcanic origin.
   The ordinary and extreme fluctuations of the river at the site of
the work are about 21 feet and 47 feet, respectively.
   The estimated cost of the dam, lock, and two power units is
$40,200,000.
   Terminal facilities.-None.
   Operations and results during fiscal year.-- ork started in Octo-
ber 1933. Since that date engineer studies, surveys, exploratory
drilling, construction roads, and camps, temporary shift in Oregon-
Washington Railroad & Navigation Co. tracks and excavation f:or
          R IVERS AND HARBORS-PORTLAND,                  OREG., DISTRICT            1335
the navigation lock have been completed; work begun on excavating
for the powerhouse foundation, relocation of Spokane, Portland &
Seattle Railway Co.'s main line; construction of 20 permanent oper-
ators' quarters; contract awarded for construction of main spillway
dam, and for furnishing 300,000 barrels of cement; and bids called
for construction of powerhouse substructure and lock masonry, and
for two 60,000 horsepower turbines. All work except incidental and
test pit work was done by contract.
   The total costs for the year amounted to $1,918,746.98 for new
work. Total expenditures were $1,837,651.96.
   Condition at end of fiscal year.-Preliminary work on the project
has been practically completed. The major portion of rights-of-way
and flowage easements remain to be purchased; construction of the
lock, powerhouse, spillway dam, highway and railroad relocation,
purchase and installation of turbines, generators, machinery equip-
ment, etc., to be completed.
   The total cost of the project to the end of the fiscal year amounted
to $1,918,746.98. Total expenditures were $1,837,651.96.
   Proposed operations.-The funds unexpended June 30, 1934, in-
cluding accounts receivable, and an additional $11,000,000 allotted
during August 1934, amounting to $29,440,884.71, will be applied
as follows:
Accounts payable June 30, 1934---------------------.-------                  $268, 198. 45
New work:
    Complete contract plans and specifications for principal
      items of work, foundation exploration, model experiments,
      rail and highway relocation surveys, and general project
      surveys, by hired labor, July 1934 to October 1934_ _--                 147, 600. 00
    Complete construction of 20 permanent operators' quarters
      under existing contract, July to December, 1934_ ___-__                 149, 600. 00
    Complete excavation for powerhouse and locks under exist-
      ing contract, July to October 1934___                 ___-__------      711, 700. 00
    Liquidation of contract for side dam and diversion channel
      excavation--------______--------------------------------                25, 000. 00
    Acquisition of lands, below and above Cascade Rapids, July
      1934 to June 1937------------------____________-                      1,968, 836. 26
    Channel improvements through Columbia Gorge by contract
      September 1935 to March 1936--_--------------------                     330, 000. 00
    Construct lock masonry, install gates, valves, machinery
      and emergency dams, complete upper and lower approach
      canals, and construct upper and lower guide walls, by
      contract, October 1934 to October 1935-_--------------                1, 200, 000. 00
    Power plant, construction of masonry substructure and
      skeleton, railroad siding to powerhouse, including bridge,
      install head gates, hoists, stop logs, fish-lifting facilities;
      construct draft tube, drainage, and pumping; and remove
      cofferdams, by contract, August 1934 to April 1936_ __                5, 882, 950. 00
    Construct main dam, including crest gates, gantry cranes,
      electric wiring, fish-lifting facilities and landscaping, by
      contract, July 1934 to December 1937_         ------- _--------      14,368, 200. 00
    Relocation of Spokane, Portland & Seattle Railway, Union
      Pacific .(Oregon-Washington Railroad & Navigation Co.)
      Railroad, Evergreen Highway (Washington side) below
      Cascade Rapids, by contract, July 1934 to December 1935,              4, 128, 800. 00

         Total--__        ____-------------------               -----      29, 440, 884. 71
1336          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

  The additional sum of $8,400,000 can be profitably expended dur-
ing the fiscal year 1936, as follows:
New work:
   Complete powerhouse structure, machine shop, and trash
     racks; purchase and install 2 turbines and 2 generators and
     transformers, auxiliaries, switch and electrical gear, etc.,
     and cranes, by contract, August 1935 to December 1937 ____ $5,300,000
   Relocate Columbia. and Evergreen Highways, Union Pacific
     Railroad, above Cascade Rapids, by contract, August 1935
     to August 1936_________________________________________      1, 550, 000
   Construct Bradford Island fishway, by contract, December
     1936 to December 1937________________________________           800, 000
   Construction of levees and drainage facilities at The Dalles,
     Oreg., and modification of miscellaneous structures above
     Cascade Rapids, Oreg., by contract, August 1935 to Au-
     gust 1936-------------------------------------------             50, 000

              Total-------------                                                                                            8,400, 000

                                    Cost and financial summary

Cost of new work to June 30, 1934_______________                                                  _______          $1, 918, 746. 98
Cost of maintenance to June 30, 1934__     _______-----------

          -Total
            cost of permanent work to June 30, 1934-----------                                                        1, 918, 746. 98
Value of plant, materials, etc., on hand, June 30, 1934--------                                                          149, 266. 76
      Net total, cost to Junle 30, 1934_______________________ 2,068, 013. 74
Plus accounts receivable, June 30, 1934----------------------     37, 836. 67

Gross total costs to June 30, 1934_________________________                                                          2, 105, 850. 41
Minus accounts payable, June 30, 1934_________________   __                                                             268, 198. 45

     Net total expenditures - ---------------------------- 1, 837, 651.96
Unexpended balance, June 30, 1934_________________________ 18,403, 048. 04
           Total amount appropriated to June 30, 1934____________ 20, 240, 700.00

    Fiscal .yearending June 30            1930                  1931                1932                    1933                1984


Cost of new work .--.....-------       ..      .....------...--------------------------...               ..---------.. $1,918, 746. 98
Cost of maintenance.-------------   ------------ --------------..--------                    --------.--------
Total expended-        ----------------          ----------------------------------------                                    1,837,651.96
Allotted...-----....                ..-------------------....
                                     ...                           --------------                      ...--------------    20,240,700. 00


Amount allotted from National Industrial Recovery Act
  approved June 16, 1933- ....-    ____________     -__ -____$20,                                                          250, 000. 00
Deductions on account of revocation of allotment--_________                                                                  9,300. 00

      Net amount to be accounted for ____--         ___
Gross amount expended------------------- $1, 942, 933. 09
                                                                                _____                              20, 240, 700. 00

Less reimbursements collected _______________ 105, 281. 13
                                                                                                                      1, 837, 651.96

      Balance unexpended June 30, 1934____      ________-       -18,                                                       403, 048. 04
Outstanding liabilities June 30, 1934----------- $128, 849.89
Amount covered by uncompleted contracts---       2, 255, 153. 89
                                                                                                                      2, 384, 003.78
           Balance available June 30, 1934 --                                                                       16, 019, 044. 26
             RIVERS AND IIARBORS-PORTLAND,                               OREG., DISTRICT                        1337
Accounts receivable June 30, 1934___ ______________-----------$37, 836. 67

     Unobligated balance available June 30, 1934___________                                   16, 056, 880. 93
Amount allotted by Public Works Administration Emergency
                                                 ______
Appropriation Act, fiscal year 1935__--_________---                                              11, 000, 000. 00

        Balance available for fiscal year 1935_______-----------                              27, 056, 880. 93

Amount (estimated) required to be appropriated for completion
of existing project 1____________________----                                                     8, 400, 000. 00

Amount that can be profitably expended in fiscal year ending
  June 30, 1936, for new work              ---------- ---------------                              8, 400, 000. 00

16. OPERATING             AND CARE OF THE CASCADES CANAL, COLUMBIA
                                  RIVER, OREG.

  Location and description.-This improvement includes about 41/
miles of the river where it passes through the Cascade Range. There
is a fall, at low water, of 24 feet in the upper one-half mile, and a
total fall of about 37 feet to, the foot of the lower rapid. (For
description of Columbia River see p. 1313 and U. S. Geological Sur-
vey, Mount Hood quadrangle.)
   Existing project.-This provides for a canal with one lock around
the upper Cascades Rapids and open-river improvement below the
canal. The section of river under improvement is about 41/2 miles in
length. rd its lower end is! about 141 -miles -from the mouth of the
river. The canal has a length of 3,000 feet and a clear width be-
tween side walls of 90 feet. The lock is located at the lower end of
the canal and has two chambers in flight, with detailed information
as follows:
                                          Dimensions of lock

                                                                 Dimensions                Lift
                                                                                                               Available
                                                                                                                depth,
               Lock                     Foundation            Greatest                                          lower
                                                             available      ar     At low     At high          miter sill,
                                                               lengt
                                                                  full
                                                                engthfor Clear
                                                                         width     Atlow
                                                                                   water      Athigh
                                                                                               water               low
                                                                                                                atater
                                                              width


                                                               Feet      Feet       Feet           Feet           Feet
Lower chamber_----.-.----       Rock ----------___                469         90        24                 0             8
Upper chamber...--..............do--     -----............        462         90         0                18             8



  There are no dams on the canal. The lower chamber only is used
up to a 13-foot stage (upper pool), after which the upper chamber
alone is used up to a 42-foot stage, lower gage, when the canal is
"drowned out."
  The ordinary summer freshets reach a stage of 42 feet at the foot
of the canal and 30 feet at the upper entrance. The highest freshet
of record (1894) reached a height of 60 feet at the lower entrance
and 50 feet at the upper entrance. Freshets occur during the winter
months, due to rains, and reach a stage of 15 feet at the lower gage,
but do not interfere with the navigation of the canal. Ice condi-
  1 Exclusive     of available funds.
1338      IEPORT OF CHIEF OF ENGINEERS,                    U.     S.   ARMY,     1934

tions, which often close the river to navigation, occur usually in
January or February.
   The estimate of cost for new work, revised in 1894, including
$413,360 for the second lock chamber and protective works, is
$3,856,763.
   The existing project was authorized by the following river and
harbor acts: The act of August 14, 1876, provided for the construc-
tion of a canal around the Cascades of the Columbia, in the State of
Oregon, and the act of July 13, 1892, provided for contracts to com-
plete the project; the act of June 3, 1896, provided for the second
lock chamber and protective works (Annual Report for 1895, p.
3571); and the act of June 13, 1902, provided for the removal of
obstructive rock in the rapids below the canal. For latest published
map see Senate Executive Document No. 26, Fifty-third Congress,
third session.
   Terminal facilities.-None.
   Operations and results during fiscal year.-The canal was in service
throughout the year, there being no closure due to ice conditions
nor to freshets.
   The costs from indefinite appropriations on account of operation,
maintenance, repairs, etc., were $17,442.14. The expenditures were
$12,613.77.
   Condition at end of fiscal year.-The canal, though in operation
since 1896, was not fully completed until 1914 and is in excellent
condition. The cost and expenditure for construction of the canal
were $3,903,780.30. There has been considerable traffic during the
past 3 years, due to log rafting and wheat shipments from the river
above the canal. The controlling depth in the canal is 8 feet at low
water.
   The cost of maintenance to June 30, 1934, was $507,315.44. The
expenditures were $511,567.84.
   Proposed operations.-The canal will be operated and maintained
under allotments from appropriations made available for such pur-
,poses.
      Cost and financial summary for maintenance and improvement funds

Cost of new work to June 30, 1934__________________------------                  $3, 903, 780. 30
Cost of maintenance to June 30, 1934____

      Total cost of permanent work to June 30, 1934 -__-____                      3, 903, 780. 30
Net total expenditures---------------------------------                           3, 903, 780. 30,

Total amount appropriated,to June 30, 1934-________-____                          3, 903, 780. 30
           Cost and financial summary for operating and care funds

Cost of maintenance to June 30, 1934___-_________---------       $507, 315. 44
Value of plant, materials, etc., on hand June 30, 1934------------ 4, 663. 70
     Net total cost to June 30, 1934____________________________                    511, 979. 14
Minus accounts payable June 30, 1934---------------------------                          411. 30
     Net total expenditures--_---__-    -____--__
Unexpended balance June 30, 1934___ ___________                        _______
                                                                                    511, U67. 84
                                                                                      1, 711. 03
       Total amount appropriated to June 30, 1934_.....---___                       513,278. 87
                 RIVERS AND HARBORS--PORTLAND,                                              OREG., DISTRICT                             1339


            Fiscal year ending June 30                         1930             1931                1932            1933               1934


Cost of new work---------------.--------------------
Cost of maintenance----------------------                 $18, 266. 77       $17, 455. 40     $16, 782. 66       $19, 801. 89      $17, 442. 14

Total expended.........---------------------.               17, 311. 11       17, 346. 36      15, 268. 39        19, 720. 02          12, 613. 77

Allotted_ ..          ....                                     20, 000. 00
                                .......----------------------------           17, 000. 00       15, 000. 00       16, 285. 47          11, 622. 60


Balance unexpended July 1, 1933 ---------------------              ---   $2, 702. 20
Amount allotted from permanent indefinite appropriation, sec. 6,
  River and Harbor Act, Mar. 3, 1909--------                                  300.'00
                                                                         1--------------------2,
       Amount to be accounted for------------------------------15, 002. 20
Deductions on account of revocation of allotment                               77. 40
                                                                             6------------------
       Net amount to be accounted for                                     4, 324. 80
                                                                         1---------------------------
Gross amount expended-----------------------------          $15, 115.19
Less:
    Reimbursements collected-------------- $2, 386. 92
    Receipts from sales---------------------       114. 50
                                                              2, 501. 42
                                                                         12, 613.77
       Balance unexpended June 30, 1934-------------------------- 1, 711. 03
Outstanding liabilities June 30, 1934------------------------------           613. 08
       Balance available June 30, 1934___________________________          1, 097. 95
Amount allotted for fiscal year 1935-----------------------------__      14, 700. 00
       Balance available for fiscal year 1935----------------------- 15, 797. 95
            17. OPERATING AND CARE OF THE DALLES-CELILO CANAL
  Location.--This improvement embraces about 12 miles of the Co-
lumbia River between The Dalles and Celilo, Oreg. (See U. S. Geo-
logical Survey Map of Oregon.)
  Previous projects.-Adopted by the River and Harbor Act of Au-
gust 18, 1894. The cost and expenditures were $47,112.83 for exam-
inations and surveys. For further details, see page 1993 of Annual
Report for 1915,
  Existing project.-This provides for open-river improvement from
the foot of Threemile Rapids to the foot of The Dalles (Fivemile)
Rapids, and a continuous canal on the Oregon shore from the foot
of The Dalles (Fivemile) Rapids to the head of Celilo Falls, the
canal to have a depth of 8 feet, width of 65 feet at the bottom, and
length of 81/2 miles, with five locks, as follows:
                                          Detailed information of locks

                                                                  Dimensions                    Lift

  Miles                                                                                                          Avail-
   from                                                         Great-                                            able        When
  lower               Lock                Foundation            lest                                             depth         com-Cost
    en-                                                         length    Clear         Low          Righ          on         pleted
tranceable                                                           for width         water        water       lower
                                                                          able                                     sill
                                                                  full
                                                                width


                                                                  Feet        Feet       Feet          Feet       Feet
     0        Tandem Locks 1___. Rock ....---------               265. 0       45. 0        70. 0      22.   0       7.   0     1915     $477,   600
     1. 6     Fivemile Lock --------...  do-.......               265. 0       45. 0        12. 0      15.   0       7.   0     1915      246,   700
     5. 2
     8. 1
              Tenmile Lock 2-........do-    .......               265. 0       50. 0   --......         7.   5       7.   0     1915      149,   600
              Celilo Lock 2--   ....     do .._-_..               265. 0       45. 0                    6.   5       7.   0     1915      103,   200

   12 chambers in flight.
   2 Not used at low water.
1340   REPORT    OF CHIEF OF. ENGINEERS,     U.   S. ARMY,   1934

   There are no dams in the canal. The lower end of the canal is
about 4 miles and the lower end of the Threemile Rapids about 11/2
miles above The Dalles, Oreg.
   The normal river freshets at the lower end of the canal reach a
stage of 45 feet and the highest flood 70 feet above low water. At
the upper end of the canal the normal freshets are about 18 feet and
the maximum rise 33 feet. The canal was designed to operate to a
stage of 18 feet at the upper pool and is then "drowned out " until
the river recedes to a stage of 18 feet.
   The estimate of cost for new work, revised in 1908, was $4,845,000,
exclusive of amount expended on previous projects. The cost of
operation and care of the canal and locks is paid from the perma-
nent indefinite appropriation for operating and care of canals, etc.
   The existing project was adopted by the River and Harbor Act of
March 3, 1905 (Annual Report, 1904, p. 3475). For latest published
map see Annual Report for 1915, page 3380.
   Local cooperation.-Fully complied with.
   Terminal facilities.-Private interests own a warehouse with a
capacity of 22,000 tons of wheat, fronting on the Dalles-Celilo Canal.
The only other terminal on this stretch of the river is a landing at
The Dalles, Oreg.
    Operations and results during fiscal year.-At the beginning of the
fiscal year the work of repairing a break in the canal about 6 miles
above lower entrance was in progress under contract. A temporary
flume constructed around the break during the previous fiscal year
permitted the lower (tandem) lock to be operated. Repairs were
completed on September 22, 1933, at a cost of $37,972.64.
   Settlement of the fill under the concrete floor and on portions of
the slope lining soon occurred, making further repairs necessary,
which repairs were completed, by hired labor, on March 24, 1934.
    On April 11 a leak developed which caused the failure of a short
section of the concrete slope lining on the river side adjoining the
work completed on March 24, 1934. Repair work was again begun
by hired labor but was soon suspended on account of the rising
annual freshet which prevented further work during the year. The
cost for the year of the hired-labor repair work was $20,436.41. Re-
moval of sand in Celilo entrance, by contract, was in progress be-
tween September 25 and October 3, 1933. A total of 6,480 cubic
yards of sand was removed at a cost of $3,544.24. Dredging by
hired labor removed 65,340 cubic yards of material from the canal
and entrance at a cost of $15,584.46. The total costs from indefinite
appropriation for operation, maintenance, and repair were $94,756.12.
The expenditures were $107,755.82.
    Condition at end of fiscal year. The canal, which was completed
in 1915, is in excellent condition, with the exception of the break now
under repair, as noted above. The cost and expenditure for con-
struction of the canal were $4,716,205.16. The lower end of the
canal is about 4 miles above The Dalles, Oreg. For detailed infor-
mation of the locks see table under " Existing project." The total
cost of maintenance to June 30, 1934, was $431,159.15. The total
expenditure from the indefinite appropriation was $444,957.29.
    Proposed operations.-The canal will be operated and maintained
under allotments from appropriations made available for such
purposes.
               R IVERS AND HARBORS-PORTLAND,                                                    OREG., DISTRICT                               1341
        Cost and financial summary for maintenance and improvement funds

Cost of new work to June 30, 1934__.____-------------                                                             -        $4, 716, 205. 16
Cost of maintenance to June 30, 1934

      Total cost of permanent work to June 30, 1934_____     4, 716, 205. 16
Net total expenditures      ---------------------------------4, 716, 205. 16
Total amount appropriated to June 30, 1934                   4,716, 205.16

          Fiscal year ending June 30                                1930             1931             1932             1933                   1934


Cost of new work----------------------                              $248.12     ----------- $6,127. 97 -
Cost of maintenance------
Total expended.....           .......------------------       -1,    214. 34 ------------            -912. 37
Allotted .-----------------------------------                                                   ---------
                                                                                                  .       .---------
                                                                                                                .                   .           -


               Cost and financial summary for operating and care funds

Cost of maintenance to June 30, 1934 ____________________---       $431, 159. 15
Value of plant, materials, etc., on hand June 30, 1934 ___________   15, 601. 96
      Net total cost to June 30, 1934 ___-----____________                                                       ____              446, 761. 11
Minus accounts payable June 30, 1934        .                                                                                       1,
                                                                                                                                     1__________________
                                                                                                                                        803. 82
      Net total expenditures_______________ _________                                                                              444, 957. 29
Unexpended balance June 30. 1934______________-___-                                                          _____                  37, 378. 39
           Total amount appropriated to June 30, 1934                                             ____-         ______             482, 335. 68

          Fiscal year ending June 30                                1930             1931             1932             1933                   1934


Cost of new work - -
Cost of maintenance-
                                -      -        -         -   -      -
                                                              $20, 902. 38
                                                                           -     --
                                                                                 $15, 894. 99
                                                                                                 -      -
                                                                                                $16, 223. 59
                                                                                                                 -     -
                                                                                                                 $40, 841. 29
                                                                                                                               -         -       --
                                                                                                                                         $94, 756. 12
Total expended            ----------------------20, 407. 59                       15, 970. 24     15, 425. 15        38, 591. 93         107, 755. 82
Allotted---------------             ------------- 21, 000.00                      19, 000.00     25, 000.00      105, 413.78                 64, 113. 15


Balance unexpended July 1, 1933____________________________   $81, 021.06
Amount allotted from permanent indefinite appropriation, sec.
  6,  iver and Harbor Act, Mar. 3, 1909__________________      66, 865. 00
          Amount to be accounted for____________________________                                                                   147, 886. 06
Deductions on account of revocation of allotment__ ______                                                                               2, 751. 85

      Net amount to be accounted for __._______-____-__-__                                                                 -       145, 134. 21
Gross amount expended_______________________-__       _                                                                            107, 755.82

      Balance unexpended June 30, 1934________________________                                                                      37, 378. 39
Outstanding liabilities June 30, 1934_____________________________                                                                   2, 555. 70
     Balance available June 30, 1934_______________________                                                                         34, 822. 69
Amount allotted for fiscal year 1935___________________________                                                                     24,000. 00

           Balance available for fiscal year 1935------                                                 ____         ____-          58, 822. 69

                                              18. LAKE RIVER, WASH.

  Location.- This river, located in Clark County, Wash., is the
outlet of Vancouver Lake, located about 2 miles northwest of Van-
1342       REPOT OF CHIEF OF ENGINEERS, U.                             S.   ARMIY,    1.934


couver, Wash. The stream flows in a northerly direction for about
11 miles and empties into the Columbia River about 91 miles above
the mouth. (See map of Columbia National Forest, U. S. Forest
Service, 1920.)
   Existing project.-This provides for a channel 6 feet deep at low
water and 100 feet wide from the mouth of the river to Ridgefield
 (3 miles). The mean tidal range at the mouth of the river is 2 feet.
   The estimated cost of new work, made in 1930, was $3,000. The
latest (1932) approved estimate for annual cost of maintenance is
$2,000.
   The project was adopted by the River and Harbor Act of July 3,
1930, in accordance with House Committee Document No. 2, Sixty-
ninth Congress, first session, as modified by the report of the War
Department dated May 10, 1930, pursuant to the commerce com-
mittee resolution of February 22, 1930.
   Terminal facilities.-There are four timber wharves on Lake
River. These are at Ridgefield, 21/2 miles above the mouth of the
river. Two of these wharves are open to the public, and two are
privately owned. The principal traffic is floated logs, which are
placed in the river from a log dump connected with the railway at
Felida. The facilities are adequate for existing commerce.
    Operations and results during fiscal year.-None.
    Condition at end of fiscal year.-The project was completed in
1931, at a saving of $300 under the estimated cost. The controlling
depth from the mouth of the river to Ridgefield is 4.5 feet at low
water. The project width of 100 feet from the mouth to Ridge-
field now obtains. The total cost of the existing project to the end
of the fiscal year was $6,700, of which $2,700 was for new work
and $4,000 for maintenance. The total expenditure was $6,700.
   Proposed operations.-The funds unexpended June 30, 1934,
amounting to $2,000, will be applied for maintenance dredging be-
tween town of Richfield and mouth of river, by contract during
September and October 1934.
   The sum of $2,000 can be profitably expended during the fiscal year
1936 for maintenance dredging between Richfield and mouth of river,
by contract, July 1 to August 31, 1935.
                                 Cost and financial summary

Cost of new work to June 30, 1934______________________      _ $2, 700
Cost of maintenance to June 30, 1934 _._____..........____--__ 4, 000

        Total cost of permanent work to- June 30, 1934--------------                               6,700

                              ----
Net total expenditures ___________-- --       -----------------                                    6, 700
Unexpended balance June 30, 1934- _________-----            -______                          __    2, 000
        Total amount appropriated to June 30, 1934 _________________                               8, 700

        Fiscal year ending June 30                    1930   1931       1932         1933          1934


Cost of new work .............------------------------------- $2,700.00 ----------...            __----
                                                                                        -......-...
Cost ofmaintenance-------------------------------------- $4,000.-00                            ....-----
                                                                                      .........---
Total expended .........
                --------------------------------
                                 .               2,700. 00             4,000. 00
Allotted------                       --------------          3,700.03 ---     __ $3,000.00
                                                                      ,-------------              $2, 000. 0
             RIVERS AND HARBORS-PORTLAND,                          OREG., DISTRICT               1343
Amount allotted from War Department Appropriation Act approved
  Apr. 26, 1934_____------       ---------------------------                                 $2, 000.00
Balance unexpended June 30, 1934_ _____----_                        _----------               2, 000. 00
Amount that can be profitably expended in fiscal                     year ending June 30,
                           1- - - - - - - - - - - - - - - - - - _- - - - -       - - - - - -
  1936 for maintenance          ___                                     _                     2,000.00

                                 19. LEWIS RIVER, WASH.

   Location.-This river rises in the Cascade Range in Washington,
flows westerly and southwesterly 110 miles and empties into the
Columbia River about 90 miles from the mouth. (See U. S. Coast
and Geodetic Survey Charts Nos. 6153 and 6154.)
   Previous projects.-The original project was adopted by the River
and Harbor Act of March 3, 1899, and modified by the River and
Harbor Act of June 13, 1902. The cost and expenditures thereunder
were $30,350, of which $22,251.62 was for new work and $8,098.38
for maintenance. For further details of previous projects see page
2001, Annual Report for 1915.
   Existing project.-This provides for a low-water channel 6 feet
deep and 50 feet wide to the forks (33/4 miles); 4 feet deep and 50
feet wide on the East Fork from its mouth to La Center (3 miles);
4 feet deep and 50 feet wide on the North Fork from its mouth to
Woodland (31/2 miles), to be secured by dredging and by the con-
struction of regulating works and for clearing the channel to Run-
yon (16 miles above Woodland). The variation of water level due to
tide ranges from about 2 feet at the mouth to 11/2 feet at La Center
and zero at Woodland. During ordinary freshets a stage of 18 feet
and at extreme floods a stage of 28.5 feet in the main river at Wood-
land, Wash., is reached.
   The estimate of cost for new work, made in 1913, was $61,500, ex-
clusive of amounts expended under previous projects. The latest
 (1928) approved estimate for annual cost of maintenance is $2,000.
   The existing project was adopted by the River and Harbor Act
of March 4, 1913 (H. Doc. No. 28, 62d Cong., 1st sess.). For latest
published map see page 3557 of Annual Report for 1904.
   Recommended modifications of project. The Chief of Engineers
has recommended that the project be modified by eliminating all
work on the East Fork and on the North Fork above Woodland.
 (H. Doc. No. 467, 69th Cong., 1st sess.)
   Terminal facilities.-At La Center, on the East Fork, and at
Woodland, on the North Fork, respectively, the terminals, pile, and
timber structures, are publicly owned and are adequate for the
existing commerce.
   Operations and results during fiscal year.-A survey was made of
the river between the mouth and the town of Woodland, on the North
Fork, and the town of Center, on the East Fork, at a cost of $474.75.
   A total of 76 snags were removed by hired labor at a cost of
$525.25. The total cost and expenditures were $1,000, all for main-
tenance.
   During the month of December 1933 the highest flood of record
occurred. Levees were washed away, homes and barns destroyed,
and some livestock drowned. Numerous trees and snags were washed
   1 Exclusive of   available funds.
        bl536-Ews     1934-     85
1344            REPORT             OF CHIEF OF ENGINEERS,                               U.     S. ARMY,           1,934


into the channel. Levees were restored and some bank protection
constructed by crews from the C. W. A. and S. E. R. A. organizations.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1927 at a saving of $25,619 under the estimated cost. The
work done has extended low-water navigation to Woodland and La-
Center, to which points the controlling depths are about 2 feet and
1 foot, respectively. The channel has deteriorated badly, due to the
fact that no maintenance work has been done since 1922. Traffic is
light and consists of rafted logs and piling and occasional pleasure
launches. The total cost and expenditures were $95,324.58, of which
$35,880.44 was for new work and $59,444.14 for maintenance.
   Proposed operations.-The funds unexpended June 30, 1934,
amounting to $1,000, will be applied to maintenance snagging,
Woodland to mouth of river, by contract in September 1934.
   The sum of $6,000 can be profitably expended during the fiscal
year 1936, as follows:
Maintenance:
   Removal of old dikes and small amount of repairs to existing dikes,
      Woodland to mouth of river, by contract, Aug. 1 to. Sept. 30, 1935_ $5, 000
   Snagging, Woodland to mouth of river, by Government plant and
      hired labor, July 1 to Aug. 15, 1935---------------------------      1, 000

            Total                  --------------------------------------------                                                6, 000
                                                 Cost and financial summary

Cost of new work to June 30, 1984 ------------------------------                                                         $58, 132. 06
Cost of maintenance to June 30, 1934-----------6-----------------                                                          7, 542. 52
           Total cost of permanent work to June 30, 1934-------------- 125, 674. 58

Net total expenditures ____--   -----------------                125, 674. 58
Unexpended balance June 3.0, 1934-------------------------------   1, 000. 00
            Total amount appropriated to June 30, 1934----------------                                                   12, 674. 58

           Fiscal year ending June 30                               1930         1931               1932        1933 •        1934


Cost of new work..... ..---------.-------
                    .
Cost of maintenance--     -____---....-----                            $0. 60    $48. 33
                                                                                              ----------.

                                                                                             -------------------
                                                                                                                           ------------
                                                                                                                             . ..--------
                                                                                                                                $1, 000
Total expended-------------------...........................---.           60     48.33 ..---------------............            1, 000
Allotted..---------..---.---                   -----------         2, 000. 00   1,000. 00 -$1, 275. 42           $1, 000         1, 000


Balance unexpended July 1, 1933-------------------------------  $1, 000.00
Amount allotted from War Department Appropriation Act approved
  Apr. 26, 1934-----------------------------------------------1,000.00

      Amount to be accounted for------------------------------- 2, 000.00
Gross amount expended-----------------------------------------1, 000. 00
     Balance unexpended June 30, 1934--------------------------                                                            1, 000. 00
Amount that can be profitably expended in fiscal year ending June
                                                                                                -
   30, 1936, for maintenance 1------------------------                                                     --     --        6, 000.00

                                             20. COWLITZ RIVER, WASH.

   Location.-This river rises in the Cascade Range in Washington,
flows westerly and southerly about 120 miles, and empties into the
    1Exclusive of available funds.
         RIVERS AND HARBORS-PORTLAND,          OREG., DISTRICT     1345
Columbia River about 70 miles from the mouth. (See U. S. Coast
and Geodetic Survey Chart No. 6153.)
    Previous projects.-Adopted by the River and Harbor Act of
June 14, 1880. Both the cost and expenditures were $53,182.93, of
which $4,999 was for new work and $48,183.93 for maintenance.
For further details see page 2000 of Annual Report for 1915.
    Existing project.-This provides for a channel 4 feet deep at low
water and 50 feet wide from the mouth to Ostrander (9 miles),
thence 21 feet deep and 50 feet wide to Castle Rock (10 miles),
and thence 2 feet deep at low water and not less than 40 feet wide
to Toledo (18 miles), to be secured by snagging, dredging, and
regulating works. The water level, due to tides, varies from 4 feet
at the mouth to zero at Ostrander. During ordinary freshets a
stage of 20 feet and at extreme floods a stage of 25.3 feet in the river
at Kelso, Wash., is reached. The estimate of cost for new work, re-
vised in 1912, was $39,100, exclusive of amounts expended on previ-
ous projects. The latest (1928) approved estimate for annual cost
of maintenance is $2,000.
    The existing project was adopted by the River and Harbor Act
of June 25, 1910 (H. Doc. No. 1167, 60th Cong., 2d sess., from the
mouth to Castle Rock, and H. Doc. No. 404, 61st Cong., 2d sess.,
from Castle Rock to Toledo). For the latest published map see
House Document No. 1167, Sixtieth Congress, second session.
    Recommended modifcations of project.-The Chief of Engineers
has recommended that the project be modified by the elimination of
:all work above Castle Rock (H. Doc. No. 467, 69th Cong., 1st sess.).
    Terminal facilities.-Above Kelso the terminal facilities are
limited to two log dumps. At Kelso there are a number of small
private wharves and one public landing. Between Kelso and the
mouth there are two private commercial wharves. These facilities
are adequate for present commerce.
    Operations and results d'uring fiscal year.-A total of 410 linear
feet of pile and stone dikes were completed by contract at ,a cost of
 $6,344.40. Repairs to existing dikes were made under contract at a
cost of $9,306.87. Under contract 1,000 linear feet of river bank,
about 1.3 miles above the mouth, was graded and riprapped at a cost
of $9,502.46. Additional riprap was placed at the shore end of one
dike by hired labor at a cost of $5,193.13. A predredging survey
was made and 17 snags were removed by hired labor at a cost of
$912.54.
    The total cost was $31,259.40, all for maintenance. The expendi-
tures were $31,180.03.
    During the month of December 1933, the highest flood of record
occurred. Some of the levees were washed away, and houses and
barns destroyed. Pile and stone dikes constructed in the past 2
years were damaged slightly. Crews under the C. W. A. and S.E.
R. A. organizations restored the levees, and in some sections the river
banks were riprapped. The project depth and width was main-
tained between the mouth of the river and Ostrander (9 miles).
    Condition at end of fiscal year.-The existing project was com-
pleted in 1913 at a saving of $6,192 under the estimated cost. The
project depth and width between the mouth and Ostrander are avail-
1346          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                  1934

able. The total cost of the existing project was $171,344.76, of which
$32,907.62 was for new work and $138,437.14 for maintenance. The
total expenditure was $171,345.89.
  Proposed operations.--The funds unexpended June 30, 1934, will
be applied as follows:
Accounts payable June 30, 1934____                                      $201.86
Maintenance:
    Bank revetment, between miles 1.5 and 2 above the mouth of the
      river by contract in September 1934 --.---------------------    3, 500. 00
    Constructing pile dikes, between miles 8.5 and 9 above the mouth
      of the river, by contract September and October 1934 --------- 5, 600. 00
   Snagging, between the mouth of the river and Ostrander by con-
      tract September and October 1934-----------------------         3, 500. 00
   Surveys, between miles 0 and 10 above the mouth of the river,
     April 1935          --------------------------------------------    596. 66
           Total           ---------------------------------------------                                          13, 398. 52
  The additional sum of $10,000 can be profitably expended during
the fiscal year 1936, as follows:
Maintenance:
   Dredging between Ostrander and mouth of river by contract Aug. 1
      to Sept. 15, 1935       -------                                 $3, 000
   Repairs and construction of dikes between Ostrander and mouth of
      river by contract July 15 to Oct. 15, 1935-------------------- 5, 000
    Snagging between Ostrander and mouth of river by Government
      plant and hired labor, July 1, 1935, to June 30, 1936               000
                                                                       1-----------,
   Surveys between Ostrander and mouth of river, Sept. 15 to Oct. 31,
      1935, and June 1 to 30, 1936___---------_________________        1,000
           Total---------                   ---                                                                      10, 000

                                          Cost and financial summary

Cost of new work to June 30, 1934---------------------------                                                  $37, 906. 62
Cost of maintenance to June 30, 1934  ------------------------                                                186, 621.07

      Total cost of permanent work to June 30, 1934------------- 224, 527. 69
Plus accounts receivable June 30, 1934------------------------        202.99

      Gross total costs to June 30, 1934-----.------------------ 224, 730. 68
Minus accounts payable June 30, 1934---------------------------       201. 86

     Net total expenditures------------------------------224, 528. 82
Unexpended balance June 30, 1934__--------------------------13, 195. 53
           Total amount appropriated to June 30, 1934--------------                                          237, 724. 35


           Fiscal year ending June 30                      1930          1931            1932         1933            1934


Cost ofnew work ------------------
Cost of maintenance..-----. --------------               $1, 629. 78   $7, 924.74    $31, 313. 29   $1,381. 91      $31, 259. 40
Total expended-----............-----------------------    1, 690. 00    7, 864. 52    31, 026. 92    1, 748. 78      31, 180. 03
Allotted   ----------------      -----------------       18, 500. 00   15, 000. 00     5,000. 00     4,970.83        37 903.52
           RIVERS AND HARBORS-PORTLAND,             OREG.,   DISTRICT         1347
Balance unexpended July 1, 1933---------------------------- $6, 472.04
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934--------   ----------- ---- $10, 000. 00
Amount allotted from War Department Appropriation
Act approved July 14, 1932__-------------              25, 000. 00
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933_----------------3-------       , 000. 00
                                                                          38, 00. 00
     Amount to be accounted for_         --------------------------- 44, 472. 04
Deductions on account of revocation of allotment--------------            96. 48

      Net amount to be accounted for----- ------------    ____-           44, 375. 56
Gross amount expended     ------------------------------------            31, 180.03
     Balance unexpended June 30, 1934----------------------- 13, 195. 53
Amount covered by uncompleted contracts ------------------   -- 201.86

     Balance available June 30, 1934__ __________       __________        12, 993. 67
Accounts receivable June 30, 1934------------------      ___-----------       202. 99

       Unobligated balance available June 30, 1934___ ______-----13, 196.66
Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1-___     __'_____       -__       _   10, 000. 00

                         21. SKAMOKAWA   CREEK, WASH.

    Location.-This creek rises in Wahkiakum County, in the south-
western part of the State of Washington, flows southwesterly and
southerly about 10 miles, and empties into the Columbia River about
36 miles from the mouth. (See U. S. Coast and Geodetic Survey
Chart No. 6152.)
    Existing project.-This provides for a channel 61/2 feet deep at
mean low water and 75 feet wide between Steamboat and Brooks
Sloughs, about 1,600 feet. The variation of water level due to tides
is about 5 feet and to freshets about 12 feet. During ordinary fresh-
ets a stage of 9 feet and at extreme floods a stage of 12 feet in the
creek at Skamokawa, Wash., is reached.
    The estimate of cost for new work, made in 1919, was $2,400. The
latest (1925) approved estimate for annual cost of maintenance is
 $2,000.
    The existing project was authorized by the River and Harbor Act
of March 2, 1919 (H. Doc. No. 111, 63d Cong., 1st sess.). The latest
published map is in the project document.
    Terminal facilities.-There are 3 privately owned wharves, 1 on
Steamboat Slough and 2 above Brooks Slough, used for general
freight and passenger purposes, and these are adequate for the
present commerce.
    Operations and results during fiscal year.-A total of 25,203 cubic
yards were removed by contract from the navigation channel re-
storing the project depth and width at a cost of $4,855.09. The
expenditures were $4,269.08.
    Condition at end of fiscal year.--The project was completed in
1920. The controlling depth was6 1/2 feet at lower low water. The
total cost of the existing project was $23,037.60 of which $2,400 was
for new work and $20,637.60 was for maintenance. The total ex-
penditures were $22,451.59.
1 Exclusive   of available funds.
1348         REPOiT OF CHIEF OF ENGINEERS, U.                                        S. ARMY, 1934

  Proposed operations.-The funds unexpended June 30, 1934,
amounting to $411.18, will be applied to the payment of accounts
payable June 30, 1934.
  The sum of $9,500 can be profitably expended during the fiscal
year 1936 as follows:
Maintenance :
   Dredging between Brooks and Steamboat Slough, by contract Jan.
      15 to Feb. 15, 1936------------------------------------$2,000
   Construction of 3 pile and stone dikes between Brooks and Steam-
      boat Slough, by contract, Jan. 1 to Feb. 15, 1936---------------7, 500

             Total                        __----------------                                                           9, 500

                                    Cost and finarcial summary
Cost of new work to June 30, 194----                             --------------- ------- $2, 400. 00
Cost of maintenance to June 30, 1934----                           ------------          20, 637. 60

      Total cost of permanent work to June 30, 1934-----------23, 037. 60
Value of plant, materials, etc., on hand June 30, 1934          -175. 89

     Net total cost to June 30, 1934------------------------22,                                                      861. 71
Minus accounts payable June 30, 1934 ---------------------------                                                     410.-12
     Net total expenditures   -------------------------------                                                     22, 451. 59
Unexpended balance June 30, 1934------------------------------                                                        411.18

         Total amount appropriated to June 30, 1934--------------                                                 22, 862. 77

         Fiscal year ending June 30                1930            1931               1932            1933            1934

Cost ofnew work------------------                                              ------------
                                                                                    $           -        --
Cost of maintenance-_                             $877. 12       $1, 056. 54        $1, 529. 58     $1, 582.51       $4, 855. 09

Total expended ------------------------            877. 12        1, 056. 54         1, 529. 58      1, 582. 51       4, 269. 08
Alltted __         -----------------             2, 000. 00 ----------------------                   3, 575. 56       2, 687. 21


Balance unexpended July 1, 1933-----------------------------$1,                                                       993.05
Amount allotted from War Department Appropriation Act approved
  Mar. 4, 1933-----    --------------------------------------                                                      2, 700. 00

      Amount to be accounted for             -------------------- 4, 693. 05
Deductions on account of revocation of allotment                       2. 79
                                                                      1------------------

      Net amount to be accounted for  ------------------------                                                     4, 680. 26
Gross amount expended --------------------------- $4, 472. 07
Less reimbursements collected------------------------202.99
                                                                                                                   4, 269. 08
     Balance unexpended June 30, 1934 ------------------------                                                       411. 18
Amount covered by uncompleted contracts------------------------                                                      410. 12

         Balance available June 30, 1934---------------                                    ------------                  1. 06

Amount that can be profitably exjpended in fiscal year ending June
30, 1936, for maintenance --------------------------------                                                        9, 500. 00
                                    22. GRAYS RIVER, WASH.
   Location.-This river rises in the Coast Range in Washington,
flows southwesterly about 30 miles, and empties into Grays Bay in
the estuary of the Columbia River, about 21 miles above the mouth.
 (See U. S. Coast and Geodetic Survey Chairt No. 6151.)
    Si~lusive of available funds.
                RIVERS AND IIARBORS-PORTLAND,                                    OREG.,           DISTRICT           1349
   Existing project.-This provides for the removal of snags and
other obstructions from the channel and overhanging trees from the
banks between the mouth and the town of Grays River, 8 miles
above. The tidal range at the mouth between mean lower low
water and mean higher high water is about 8 feet, and the extreme
range is about 12 feet.
   The estimate of cost for new work, made in 1907, was $2,500. The
latest (1918) approved estimate for annual cost of maintenance is
$500. The existing project was adopted by the River and Harbor
Act of March 2, 1907. (Rivers and Harbors Committee Doc. No. 1,
59th Cong., 2d sess.) There is no published map.
   Terminal facilities.-The terminals are natural landings or small
wharves, privately owned, and are adequate for the present commerce.
   Operations and results during fiscal year.-None.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1909. There is at present no steamboat service on the river,
and none in prospect. The river is in fairly good condition, but
shoal. For about 61/2 miles above the mouth the controlling depth
is 2 feet, and above that, to town of Grays River, 11/2 miles further
up, it is practically dry in 2 places at low-water stage. The river is
used for logs only above the town of Grays River. The total cost and
amount expended under the existing project is $6,007.99, of which
$2,500 was for new work and $3,507.99 for maintenance.
  Proposed operations.-The funds unexpended June 30, 1934,
amounting to $500, will be applied to maintenance snagging between
town of Grays River and mouth of river by Government plant and
hired labor, September 1934.
   The sum of $1,000 can be profitably expended during the fiscal year
1936 for snagging between town of Grays River and mouth of
river during July 1935.
                                       Cost and financial summary
Cost of new work to June 30, 1934------------------------------                                                $2, 500. 00
Cost of maintenance to June 30, 1934------------------------------                                              3, 507. 99
            Total cost of permanent work to June 30, 1934                                                          007. 99
                                                                                                                6-------------,

Net total expenditures-----------------------------------       6, 007.99
'Unexpended balance June 30, 1934------------------------------    500. 00
            Total amount appropriated to June 30, 1934----------------                                          6, 507. 99

            Fiscal year ending June 30             1930             1931                 1932           1933         1934


Cost of new world.k....-
Cost of maintenance-----------            ------    ----       --   --       ---------        --------------------
Total expended..                  --                       -             -               --                           ..---
Allotted.        -----------------------------------------------                    -$792. 01------------             $500. 00
1350        REPORT OF CHIEF OF ENGINEERS,                            U.    S.   ARMY,      1934

Amount allotted from War Department Appropriation Act approved
  Apr. 26, 1934                                                                                          $500
Balance unexpended June 30, 1934----------------------------_ __                                          500
Amount that can be profitably expended in fiscal year ending June 30,
1936 for maintenance - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1,000

                                    23. DEEP RIVER, WASH.

    Location.-This river is mainly a tidal slough of Grays Bay,
Wash., an estuary on the north side of the Columbia River, about
20 miles from the mouth. The slough extends northerly about 4
miles from the northern end of Grays Bay, and the section above
the head of the slough has several small tributaries. (See U. S.
Coast and Geodetic Survey Chart No. 6151.)
    Existing project.-This provides for a channel 8 feet deep at mean
lower low water, 100 feet wide through the bars at the mouth of the
river and the entrance thereto, and 60 feet wide in the river up to
the town of Deep River. The mean range of tide is 6 feet, during
ordinary freshets a stage of 9 feet, and at extreme floods a stage of
14 feet in the river at the town of Deep River, Wash., is reached.
    The estimate of cost for new work, revised in 1927, was $18,200.
The latest (1923) approved estimate of annual cost of maintenance
is $2,400.
    The existing project was adopted by the River and Harbor Act
of March 3, 1925 (H. Doc. No. 218, 68th Cong., 1st sess.). There is
no published map.
    Terminal facilities.-There is one privately owned wharf at the
town of Deep River for general freight and passenger purposes
which is adequate for the present commerce.
    Operations and results during fiscal year.-Other than an investi-
gation to ascertain channel conditions no work was done during the
fiscal year. The cost for the year was $335.93 all for maintenance.
The expenditures were $301.87.
    Condition at end of fiscal year.-The project was completed in
1928 at a saving of $2,815 under the estimated cost. There is now a
channel between deep water in the Columbia River 71/2 feet deep at
mean lower low water with a least width of 100 feet as far as the
mouth of Deep River, and 8 feet deep and 60 feet wide thence to the
town of Deep River. The total cost was $26,730.07, of which $15,-
384.40 was for new work and $11,345.67 for maintenance. The total
expenditures were $26,730.07.
    Proposed operations.-The funds unexpended July 30, 1934,
amounting to $2,403.32, will be applied to maintenance as follows:
Dredging between town of Deep River and mouth of river, by con-
  tract, from July 1 to Aug. 15, 1934_-.....  _______--------   $2, 200.00
Surveys and inspections------------ ----                            203. 32

        Total                                                                                         403. 32
                                                                                                   2,--------------------------
  The additional sum of $2,400 can be profitably expended during
the fiscal year 1936, for maintenance dredging between town of Deep
River and mouth of river, by contract, from July 1 to August 15, 1935.
  'Exclusive     of available funds.
             RIVERS AND HARBORS-PORTLAND,                                 OREG., DISTRICT                     1351
                                   Cost and financial summary
Cost of new work to June 30, 1934_.......__                             __---------------- $15, 384. 40
Cost of maintenance to June 30, 1934_____                               ________11111 11, 345. 67
        Total cost of permanent work to June 30, 1934_-.....                              ____-           26, 730. 07

Net total expenditures __-__----______------                                                              26, 730. 07
Unexpended balance June 30, 1934__                       _________                                         2, 403.32
         Total amount appropriated to June 30, 1934_ ...                       ____.___-                  29, 133.39

         Fiscal year ending June 30               1930           1931         1932            1933            1934

Cost of new work.----------------------------
Cost of maintenance __--_ ___________ _         $1, 484. 61      --
                                                              -_$8,            014. 95      $1, 387. 18        $335. 93
Total expended____            ______________      , 484. 61 .   -..          4, 818. 68      4, 617. 51         301. 87
Allotted_ -----    ____       ________
                                  -__-____- _    2, 400.00    _---    - - 7, 500. 00           783. 78          249. 61


Balance unexpended July 1, 1933---------------------------- $2, 455. 58
Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934_---------------------                            250. 00
      Amount to be accounted for -     -- __-_                                                             2, 705. 58
Deductions on account of revocation of allotment _...._____--__-                                                 . 39
      Net amount to be accounted for___ _______                                                            2, 705. 19
Gross amount expended___----   ----------------------------                                                   301. 87

         Balance unexpended June 30, 1934__                                                                2, 403. 3.2
Amount that can be profitably expended in fiscal year ending June 30,
                               - - - - - - - - - - - - - - - - - -- -
1936, for maintenance 1_____                                         ____                                 2, 400. 00

                  24. COLUMBIA RIVER AT BAKERS BAY, WASH.

   Location.-Bakers Bay is a shallow body of water about 15 square
miles in extent lying on the north side of the Columbia River near
its mouth. The bay is separated from the river by Sand Island, a
low-lying sand bar only a few feet above high-tide level.
   Existing project.-No work has been authorized by Congress.
The provision of a channel 10 feet deep and 200 feet wide extend-
ing through the easterly passage at Sand Island to the port of
Ilwaco, a distance of about .5 miles, as recommended by the Chief of
Engineers in House Document No. 44, Seventy-third Congress, first
session, was authorized by the Federal Emergency Administration
of Public Works. The above-named document contains the latest
published map. Mean lower low water is the plane of reference.
The tidal range between mean lower low water and mean high water
is about 8 feet; the extreme tidal range is about 12 feet.
   The estimate of cost for new work, as revised in 1934, is $80,000,
with $6,000 for annual maintenance.
   Terminal facilities.-Terminals have been constructed at Ilwaco
along Holman Waterway, 200 feet wide by 3,000 feet in length and
on a dredged basin 400 by 1,000 feet. The facilities consist of
wharves, floats, and ramps and berths for oil barges and oil boats.
The facilities are adequate for the present commerce.
   x Exclusive of available funds.
 1352          REPORT           OF CHIEF OF                   ENGINEERS, U.                   S. ARMY,    1934


    Operationsand results during fiscal year.-New work dredging was
  done under contract. The contractor's dredge Natoma excavated
722,703 cubic yards and reached a point about 2,000 feet from the
  harbor of Ilwaco. Cost of the work was $59,816.82, and expendi-
tures $29,978.40, all Public Works funds.
    Condition at end of fiscal year.-The project was about 75 percent
completed. Sixteen thousand linear feet of the channel had been
dredged to a depth of 10 feet at mean lower low water and width of
'200 feet. There remained about 2,000 feet of channel to be dug to
complete the project. In this section the least depth at mean lower
low water is 4 feet. The total cost was $59,816.82 and the total ex-
penditures were $29,978.40, all Public Works funds.
    Proposed operations.-The funds unexpended June 30, 1934, from
the National Industrial Recovery Act, amounting to $50,021.60, will
be applied as follows:
Accounts payable June 30, 1934__                             $29, 838.42
New work: Completion of dredging in Baker Bay, July 1 to 25,
  1934---------------        -------------------------------- 20, 000.                                                      00
           Subtotal                        --------------------------------                                     49, 838. 42

Balance remaining_________                                   -------------------                                    183. 18

           Total --------------------------------------------                                                   50, 021. 60
  No additional funds can be profitably expended during fiscal year
1936.
                                             Cost and fina/ncial summary

Cost of new work to June 30, 1934_______-- __--__---------------                                                $59, 816. 82
Cost of maintenance to June 30, 1934_-________------------

      Total cost of permanent work to June 30, 1934------------                                                  59, 816. 82
Minus accounts payable June 30, 1934____________----------                                                       29,838. 42

      Net total expenditures-------------------- ------------                                                   29, 978.40:
Unexpended balance June 30, 1934______________-------------                                                    50, 021.60

           Total amount appropriated to June 30, 1934 _____________                                              80,000. 00

           Fiscal year ending June 30                          1930             1931           1932      1933        1934

Cost ofnew work------.....-------------------- -------------------------------- $59,816.82
Cost ofmaintenance------------------------------------------------------
Total expended- ..............---------------------------------------------------------....              .........29,978.40
Allotted---------------------------------------- ------------------------ ------------                              80, 000. 00


Amount allotted from National Industrial Recovery Act approved
  June 16, 1933----------------------------------------            $80, 000. 00
Gross amount expended-------------------------$35, 357.41'
Less reimbursements collected ---------------------     5, 379. 01
                                                                    29, 978. 40

     Balance unexpended June 30, 1934 ____-_____--------                                                        50,02t1 60
Amount covered by uncompleted contracts- ------------------                                                     49, 941. 60

           Balance available June 30, 1934------------------                                                       - 80.00
               RIVERS AND HARBORS-PORTLAND,                                OREG., DISTRICT                 1353
  25. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                              (GENERAL)

   The cost of work during the year was $43,043.30; the expenditures
were $45,062.45. The funds unexpended June 30, 1934, amounting
to $28,221.12, will be applied as needed during the fiscal year 1935 to
payment of expenses to be incurred in connection with the above
items. The additional sum of $35,000 can be profitably expended
during the fiscal year 1936.
                                      Cost and financial summary
Cost of maintenance to June 30, 1934                                    672. 42
                                                                    $-------------------
Value of plant, materials, etc., on hand June 30, 1934 ------------      85.00

     Net total cost to June 30, 1934 --------------------------- 284, 757. 42
Minus accounts payable June 30, 1934---------------------------    2, 940. 55

     Net total expenditures ----------------------------------                                        281, 816. 87
Unexpended balance June 30, 1934 ------------------------------                                        28, 221, 12

          Total amount appropriated to June 30, 1934---------------310, 037. 99

      Fiscal year ending June 30          1930            1931             1932           1933            1934


Cost of new work...-----------
Cost of maintenance ------------        $23, 037. 57   $23, 687. 59    $105, 239. 51   $75, 459. 05      $43, 043. 30
Total expended-------_    ---------      21, 625. 75     25, 188. 63    102, 905. 48    73, 619. 68       45, 062. 45
Allotted----------------------           18, 600. 00     40, 300. 00     75, 000. 00   103, 657. 24       39, 980. 75



Balance unexpended July 1, 1933..-------------------------------$33, 302.82
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934----------------------- $23, 250.00
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933------------------------ 18, 300. 00
                                                                  41, 550. 00

      Amount to be accounted for ------------------------------                                        74, 852.82
Deductions on account of revocation of allotment---                                                     1, 569. 25

      Net amount to be accounted for---------------------------- 73, 283. 57
Gross amount expended______       -________           $55, 037.: 20
Less reimbursements collected                              974. 75
                                                        9,--------------------
                                                                        45, 062.45

    Balance unexpended June 30, 1934---------------------------28, 221. 12
Outstanding liabilities June 30, 1934----------------------------- 3, 465. 41
          Balance available June 30, 1934--------------------------                                   24, 755. 71
Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -    35, 000. 00

  1   Exclusive of available funds.
1354        REPORT          OF CHIEF         OF    ENGINEERS,             U.    S.   ARMY,        1934


                 26. Other projects for whick no estimates are submitted

                   [Commercial statistics for these projects are given in pt. 2 of report]


                                                          For last     Cost and expenditures to
                                                         full report         June 30, 1934                 Estimated
                           Name  of
                           project                           see     I                                     amount re-
                    Name of project                        annual                                           quired to
                                                           report      New work     Maintenance             complete



Siuslaw River, Oreg. 1                                    1931.....2$526, 588. 87       3 $42, 551. 43     _____
Nehalem Bay, Oreg.1                                       1933_____ 4 302, 691.71          11, 415. 59    ____-__-
Columbia River and tributaries above Celilo Falls
  to mouth of Snake River, Oreg. and Wash. 15.. 1931 .                   494, 610. 90     96, 889. 10
Snake River, Oreg., Wash., and Idaho 1 7.      1931      8302, 891. 74                  9 182, 773. 72             $69,500
Skamokawa (steamboat) Slough, Wash.1 103_._._. 1932______                                    (11)                    8, 300

  1 Channel adequate for present commerce.
  2Exclusive of $322,531.59 expended by local interests.
  3 Expended $492.21 and $61.51 revoked, fiscal year 1934.
  4 Expended during the fiscal year 1934 for general supervision and survey, $758.27. The costs were
$769.27, accounts payable are $11.00. Does not include $304,825.61 contributed funds expended for new
work.
  6 Modification of project recommended in Rivers and Harbors Committee Doc. No. 16, 73d Cong., 2d
sess.
  6 Does not include $25,000 contributed funds expended for new work.
  7 Modification of project recommended in Rivers and Harbors Committee Doc. No. 25,72d Cong., 1st
sess.
   s Does not include $85,000 contributed funds expended for new work.
  9 Includes $540.52 plant value.
  to Awaiting local cooperation.
  11 Local interests are to contribute additional $20,000.



Status of reports called for by river and harbor acts and committee                                      resolutions


        Locality              Authorization act
                                                        Transmitted            Document no.              Recommen-
                                                        to Congress                                        dation
                                                                                                    i



Beaver Slough, Oreg.,       Senate committee res-       Apr.   3,1934                                    Unfavorable.
  Westport Slough to          olution, Jan. 12, 1934.
  Wallace Slough.
Columbia and lower          Senate committee res-       Sept. 22, 1933                                      Do.
  Willamette Rivers be-      olution, Mar. 23,1933.
  tween Portland, Oreg.,
  and the sea.
Columbia River and          Flood Control        Act,
  tributaries, Wash. and      June 13, 1934.
  Oreg. (preliminary ex-
  amination for flood
control).
Columbia River, Wash.       Senate committee res-       Aug. 21, 1933                                    Favorable.
and Oreg. (Warren-          olution, May 12,1932.
  dale Dam).
Columbia River, Wash.,      Rivers and Harbors
and Oreg., Willam-           Committee resolu-
ette River to Bonne-         tion, Jan. 5, 1934.
ville Dam.
CooS Bay, Oreg _._.         Senate committee res-       Apr. 26, 1934    1-                                 Do.
                              olution, May 11,
                              1933.
Coquille River,       Bar   Senate resolution, Dec.
  and Entrance, Oreg.         8, 1932.
Cowlitz River, Wash.,       Flood Control Act,
  and tributaries (pre-       June 13, 1934.
  liminary examination
  for flood control).
Lewis River and tribu-       do do          --
  taries, Wash. (prelimi-
  nary examination for
  flood control).
Port Orford Harbor,         River and Harbor            Aug. 15, 1933    1                               Unfavorable.
  Oreg.                       Act, July 3, 1930.
Siletz River, Bar and       Senate committee res-
  Entrance, Oreg.             olution, Apr.19,1934.
Siuslaw River, Oreg.. -     Senate committee res-
                              olution, May 31,1934.
Smith River, Oreg......     River and Harbor            Apr. 27,1934      House Document No.                Do.
                              Act, July 3, 1930.                            322, 73d Cong., 2d
                                                                           sess.
               RIVERS AND HARBORS-SEATTLE,                                WASH.,         DISTRICT         1355
Status of reports called for by river and harbor acts and comnmittee resolutions-
                                    Continued                                                                          !iii!   A. .
                                                                                                                                      ,
         Locality              Authorization act          Transmitted
                                                          to Congress          Document no.
                                                                               Document no.           Recommen-
                                                                                                      Recommen
                                                                                                                     H It      9
                                                          to Congress                                  dation
                                                                                                                            441
Snake River, Oreg.,
  Wash., and Idaho.
                             Rivers and Harbors
                               Committee resolu-
                                                                   _      -
                               tion Jan. 29, 1934.
Tillamook Bay and En-        Rivers and Harbors           Sept. 16, 1933 ------------------- Unfavorable
  trance, Oreg,                Committee resolu-
                                lution, May 5, 1932;
                                Senate     committee
                                resolution, May 12,
                          1932.
Tillamook River, Oreg_. Rivers and Harbors ------        ------------------------
                          Committee resolu-
                         tion, June 13, 1934.
Umpqua Harbor and Senate committee res- _.......--------------------
  River, Oreg.                  olution,    Dec.    20,
                           1933.
Umpqua River, Oreg __    Rivers and Harbors-----   ------------------------
                           Committee resolu-
                           tion, June 15, 1934.
Willamette River, Oreg., River and Harbor Aug. 23, 1933 ----------------------                          Do.
Portland to Eugene        Act, July 3, 1930;
and Salem.                Senate committee
                                resolution, May 29,
                           1930.
             E.u.gene.....
Willamette River, Oreg., Senate committee res- ..            ..........
Portland to Eugene.       olution,Sept.27,1933.
Yaquina Bay, River Senate committee res- ...........---------------------.......................---
and Entrance.             olution, July 25,1933.



    IMPROVEMENT OF RIVERS AND HARBORS IN THE
             SEATTLE, WASH., DISTRICT
  This district includes the States of Washington and Idaho except
the basins of Snake River and Columbia River below the mouth of
the Snake; also that part of Montana west of the Rocky Mountains,
and Alaska.
  District engineer: Lt. Col. C. L. Sturdevant, Corps of Engineers.
  Division engineer : Lt. Col. Thomas M. Robins, Corps of Engineers.
                                                   IMPROVEMENTS

                                                    Page                                                      Page
1. Willapa River and Harbor,                                 11. Everett Harbor and Snoho-
      Wash                       1356                               mish River, Wash ______                   1383
2. Grays Harbor and Bar En-                                  12. Bellingham Harbor, Wash__                   1385
      trance, Wash__             1360                         13. Wrangell Narrows, Alaska_                   1387
3. Grays Harbor, inner portion,                              14. Harbor of Refuge, Seward,
      and Chehalis River, Wash_ 1363                                Alaska                                    1389
  4. Quillayute River, Wash ..   1366                         15. Nome Harbor, Alaska .--.                    1390
5. Puget Sound and its tribu-                                16. Lowell Creek, Alaska, flood
      tary waters, Wash_____     1368                               control       __    ____                  1394
6. Olympia Harbor, Wash
7. Tacoma Harbor, Wash_____ 1372
                                 1369      --.                17. Salmon River, Alaska, flood
                                                                    control                                   1396
8. Seattle Harbor, Wash___ __   1376                         18. Examinations, surveys, and
9. Lake Washington Ship                                            contingencies (general)__                 1397
      Canal, Wash____________    1378                         19. Other projects for which no
10. Operating and care of Lake                                      estimates are submitted__                 1398
      Washington Ship Canal,
      Wash ---------------- __   1382
1356    REPORT   OF   CHIEF OF   ENGINEERS,   U.   S. AR1VY,   19 3 4

              1. WILLAPA RIVER AND HARBOR, WASH.

   Location.-Willapa Harbor consists of the lower reaches of Wil-
lapa River and Willapa Bay, an inlet of the Pacific Ocean located
about 30 miles north of the mouth of Columbia River. Willapa
River rises in the State of Washington about 30 miles east of the
harbor, flows in a general westerly direction and empties into the
bay. (See U. S. Coast and Geodetic Survey Chart No. 6185.)
   Previous projects.-Adopted by the River and Harbor Act of
July 13, 1892, and modified by the River and Harbor Acts of August
18, 1894, March 3, 1899, June 13, 1902, March 2, 1907, and June
25, 1910.
   The cost and expenditures on original and modified projects prior
to the adoption of the existing project in 1916 were $228,083.83 for
new work and $7,176.62 for maintenance, a total of $235,260.45.
Contributed funds for new work amounted to $6,596.92. For further
details of previous projects adopted prior to June 25, 1910, see page
2001 of Annual Report for 1915.
   Existing project.-This provides for the maintenance, by dredging,
of a channel over the bar at the mouth of Willapa Bay, 23 feet deep
at mean lower low water and of such width as is economically obtain-
able, and for a channel 24 feet deep at mean lower low water and
200 feet wide from deep water in Willapa Bay to the forks of the
river at Raymond, and 24 feet deep and 150 feet wide up the South
Fork as far as the deep basin above the Cram lumber mill, and up
the North Fork to a point opposite Twelfth Street, with a turning
basin 250 feet wide, 350 feet long, and 24 feet deep at the latter point,
and a closing dike at Mailboat Slough. The length of the section
included in the project in 26 miles. The extreme tidal range at
Willapa Bay entrance is 13.6 feet. The range between mean lower
low water and mean higher high water is 8.1 feet at the entrance and
9.6 feet at South Bend. The estimate of cost for new work revised
in 1918 was $819,170, exclusive of amounts expended on previous
projects, but including $71,775 contributed by local interests. The
latest (1926) approved estimate for annual cost of maintenance is
$50,000.
   The project was authorized by the following river and harbor acts:
The act of July 27, 1916 (H. Doc. No. 706, 63d Cong., 2d sess.), pro-
vided for the river channel, and the act of January 21, 1927 (H. Doc.
No. 565, 69th Cong., 2d sess.), provided for the maintenance of the
bar channel. The latest published maps are printed in the former
document and Rivers and Harbors Committee Document No. 41,
Seventy-second Congress, first session.
   Recommended modifications of project.-Under date of June 29,
1932, the Chief of Engineers recommended modification of the exist-
ing project so as to provide for a :channel over the bar at the mouth
of Willapa Bay, 26 feet deep, with a minimum width of 500 feet, at
an estimated cost of $80,000 annually for maintenance in addition to
that now required. (Rivers and Harbors Committee Doc. No. 41,
72d Cong., 1st sess.) Included in Public Works program. On
April 13, 1934, the Chief of Engineers recommended the further
improvement of Willapa River and Harbor by htraightening the
river channel at the "Narrows " about a mile downstream from
         RIVERS AND HARBORS-SEATTLE,           WASH., DISTRICT       1357
Raymond, by ,a cut-off channel 200 feet wide, 24 feet deep, and about
3,100 feet long, at an estimated cost of $207,000 for new work, with
maintenance estimated at $5,000 annually for the first 4 years, subject
to certain conditions of local cooperation. (Rivers and Harbors
Committee Doc. No. 37, 73d Cong., 2d sess.)
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are 5 sawmill wharves, 2 city wharves,
1 port wharf, 1 railway wharf, and 2 oil wharves on Willapa River.
The city, port, and railway wharves are open to general public use.
These facilities are considered adequate for existing commerce.
   Operations and results during fiscal year.-Under regular appro-
priations, maintenance dredging in the bar channel was continued by
the U. S. dredge Mackenzie, a total of about 3 months, 822,301 cubic
yards being removed. Surveys of the bar channel were made in
August and October 1933, and March, May, and June 1934, and of
the river channels in March, May, and June 1934. The total cost
was $73,832.72, all for maintenance. The expenditures were
$66,668.48.
   With Public Works funds, shoals in the Willapa River and South
Fork were removed by dredging 553,177 cubic yards under contract,
February 7 to May 22, 1934, at a cost of $78,532.41, for maintenance.
The expenditures were $78,230.06.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1924 at a saving of $225,437 under the estimated cost. The
dikes constructed under previous projects are in good condition. A
survey in June 1934 showed a controlling depth of 25 feet over an
indefinite width across the bar. The controlling depth in the river
channels in June 1933 was 24 feet below Raymond, 24 feet in the
North Fork, and 27 feet in the South Fork, except in the upper
portions of the forks where there is no navigation at present and no
recent soundings have been taken.
   Under regular appropriations, the total costs of the existing proj-
ect have been $521,957.42 for new work and $474,298.46 for mainte-
nance, a total of $996,255.88, and $71,775 for new work from con-
tributed funds. The total expenditures have been $971,691.43.
   The costs and expenditures from Public Works funds for mainte-
nance dredging have been $78,532.41 and $78,230.06 respectively.
   The total cost, all Federal funds, was $1,074,788.29, of which
$521,957.42 was for new work, and $552,830.87 for maintenance. The
total expenditures were $1,049,921.49. In addition, $71,775 was ex-
pended from contributed funds.
   Proposed operations.-The balance unexpended June 30, 1934,
from regular funds will be applied to maintenance, as follows:
Accounts payable June 30, 1934------------------------------- $11, 610. 63
Dredging of bar channel, with Government plant and hired labor,
  May-June 1935 -------------------       ------------------- 40, 769. 42

      Total -------   --------------------------------------     52, 380.05
  Of the balance unexpended June 30, 1934, from Public Works
funds ($1,769.94), $302.35 will be applied to accounts payable, the
remainder being available for reallotment.
1358       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                           1934

   The additional sum of $50,000 can be profitably expended during
the fiscal year 1936, for maintenance of project depth in the bar
channel, with Government plant and hired labor. This amount will
be necessary to maintain the bar channel in a condition to serve exist-
ing commerce.
                                    Cost and financial summary
                           MAINTENANCE AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934__________________________                                     1   $750, 041. 25
Cost of maintenance to June 30, 1934 _______________-_____                                           481, 475. 08

      Total cost of permanent work to June 30, 1934----------                                   1, 231, 516. 33
Value of plant, materials, etc., on hand June 30, 1934---------                                  -12, 953. 82

     Net total cost to June 30, 1934____  __  _____________                                     1,218, 562. 51
Minus accounts payable June 30, 1934_ .. _________---___.                                          11, 610.63
     Net total expenditures-----------------------------      1,206, 951. 88
Unexpended balance June 30, 1934___________------------------    52, 380. 05

        Total amount appropriated to June 30, 1934_... __---___                                 1, 259, 331.93

   Fiscal year ending June 30           1930           1931            1932             1933                1934


                ....-----.--------------
Cost of new work---
Cost of maintenance-------------       $4, 425. 22   $31, 591.15    $198, 741. 23     $67, 575. 70         $73, 832. 72

Total expended-----7----------         7, 645.97      20, 538. 09    173, 027. 09      87, 248. 56          66, 668.48

Allotted ------------------------     -2, 000. 00     50, 000. 00    120, 000. 00     130, 142. 90          60, 707. 03



Balance unexpended July 1, 1933 ________________________________ $58, 341. 50
Amount allotted from War Department Appropriation
Act approved Apr. 26, 1934___________     __________ $34, 000. 00
Amount allotted from War Department Appropriation
Act approved July 14, 1932----------------------17,       950.86
Amount allotted from War Department Appropriation
Act approved Mar. 4, 1933--------------------------9, 049. 14
                                                                   61, 000. 00
     Amount to be accounted for ______________                                          ______-119,341.           50
Deductions on account of revocation of allotment __-__---.                               ___---              292. 97
      Net amount to be accounted for ______________________-        119,048. 53
Gross amount expended__________________________       $68, 211. 30
Less reimbursements collected _______________________    1, 542. 82
                                                                     66, 668. 48
      Balance unexpended June 30, 1934 __-__________         ______                                    52, 380. 05
Outstanding liabilities June 30, 1934_.... .______    _ $11, 610.63
Amount covered by uncompleted contracts- ___- -___--303.         34
                                                                                                       11,913.97
         Balance available June 30, 1934_.__....                              _____        -        -40,     466. 08
Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance -------- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -          50, 000. 00
   1 In addition, $78,371.92 was expended from contributed funds.
   2 Exclusive  of available funds.
                   RIVERS AND HARBORS-SEATTLE,                                          WASH., DISTRICT                             1359
                                                   PUBLIC       WVORKS FUNDS


Cost of new work to June 30, 1934--
Cost of maintenance to. June 30, 1934 --                                      --------------------                           $78, 532. 41
     Total cost of permanent work to June 30, 1934-------------                                                               78, 532. 41
Minus accounts payable June 30, 1934                                                                                              302. 35

            Net total expenditures-_                                                                                          78, 230. 06
Unexpended balance June 30, 1934                                                         -----                     ---         1, 769. 94

            Total amount appropriated to June 30, 1934----------------80,                                                          000. 00

            Fiscal year ending June 30                         1930             1931              1932              1933            1934


Cost of new work_.... __.. ...                                                                                    .     .
Cost of maintenance..        ..--------------                     ____________           ------
                                                                                         --..               ------------  532. 41
                                                                                                                  ..... $78,
Total expended..-                       ------------------------------------------------                                          78, 230.06
Allotted- ............
                  ......                          .. ..                 _--         -____I
                                                                                     __ __....._            __                    80,000. 00


Amount allotted from National Industrial Recovery Act approved
  June 16, 1933__------------------------------------------- $80, 000. 00
Gross amount expended---------                                 78,230. 06:

    Balance unexpended June 30, 1934---                                                                                           769.94
                                                                                                                               1,------------------
Amount covered by uncompleted contracts ____--------------302.35.

            Balance available June 30, 1934____________------                                                                  1,467. 59

CONSOLIDATIED            COST AND           FINANCIAL          SUMMARY              FOR WILLAPA              RIVER AND          HARBOR,
                                                                WASH.


Cost of new work to June 30, 19341_____________________                                                                     $750, 041. 25
Cost of maintenance to June 30, 1934-----------------------                                                                  560, 007. 49

      Total cost of permanent work to June 30, 1934 ----------                                                             ,310, 048. 74
Value of plant, materials, etc., on hand June 30, 1934-----------                                                          -12, 953. 82

     Net total cost to June 30, 1934____________1___-1___ 1,297, 094. 92
Minus accounts payable June 30, 1934_ -.----------------  -  11,912. 98

     Net total expenditures                                                                                                 285, 181. 94
                                                                                                                         1------------------------------1,
Unexpended balance June 30, 1934 -------------------------                                                                   54, 149. 99

            Total amount appropriated to June 30, 1934_ ........                                                  __. 1, 339, 331.93

     Fiscal year ending June 30                    1930                1931                1932                  1933             1934


                ... --
Cost of new work------                      --------      -------- -----------                         --                ,,
Cost of maintenance-          -------       --   $4, 425.22       $31,591. 15          $198, 741. 23         $67, 575. 70      -$152,   365. 13

Total expended-----.........---------....         7, 645. 97          20, 538.09'       173,027. 09          87, 248. 56         144, 898. 54

Allotted--------....   --.--------               -2, 000. 00          50, 000. 00       120, 000. 00         130,142. 90        140, 707. 03;

    2   In addition, ,78,371.92         was expended from contributed funds.
           91536---ENG 1984-             86
1360     REPORT      OF CHIEF OF ENGINEERS,              U. S. ARMY,    1934

Balance unexpended July 1, 1933 _--_-_-_---__-_--                $58, 341. 50
Amount allotted from War Department Appropriation
Act approved April 26, 1934--__------- -----       $34, 000. 00
Amount allotted from War Department Appropriation
Act approved July 14, 1932_.....------------     -  17, 950. 86
Amount allotted from War Department Appropriation
  Act approved March 4, 1933----------------------    9, 049. 14
Amount allotted from National Industrial Recovery
  Act approved June 16, 1933----------------__       80,000. 00
                                                                 141, 000. 00

     Amount to be accounted for--    .     ----  ---------.                 199, 341.50
Deductions on account of revocation of allotment ___---___------            -    292.97

      Net amount to be accounted for- --                 ______----__--199, 048. 53
Gross amount expended_         -       -_______
                                             _-___--__       $146, 441. 36
                                  ----
Less reimbursement collected_--_ _-------____-                  1, 542. 82
                                                                           144, 898. 54
       Balance unexpended June 30, 1934___ _________----
                                                    -         -              54, 149. 99
,Outstanding liabilities June 30, 1934___              $11, 610. 63
Amount covered by uncompleted contracts __ ____- -         605. 69
                                                                             12, 216. 32

       Balance available June 30, 1934_____________--_--_....         __-    41, 933. 67
Amount that can be profitably expended in fiscal year ending June
                           1 -             - - - - -    -
30, 1936, for maintenance . ______ __           ___      __ ___             50, 000. 00

         2. GRAYS HARBOR AND BAR ENTRANCE, WASHINGTON

   Location.-Grays Harbor lies at the mouth of Chehalis River, in
the southwestern part of the State of Washington, 45 miles north of
the entrance to Columbia River. (See U. S. Coast and Geodetic
Survey Chart No. 6195.)
    Emisting project.-This provides for a south high-tide rubblestone
jetty 13,734 feet long, and a north midtide jetty 16,000 feet long, and
for a channel over the bar of such depth as can be secured by dredg-
ing at an estimated annual cost of $250,000 without reconstruction or
extension of the jetties. The width between the westerly ends of the
jetties is 6,500 feet. The extreme tidal ranges are 14.4 feet on the
bar and 16.6 feet in the harbor. The ranges between mean lower low
water and mean higher high water are 9.1 feet on the bar and 10.1
feet in the harbor. The cost of the jetties is $2,567,993.34 for new
work and $622,986.45 for maintenance.
    The project was authorized by the following river and harbor
acts: The act of June 3,1896, provided for the south jetty (Annual
Report for 1895, pp. 3517-3533); the act of March 2, 1907, provided
for a north jetty 9,000 feet long (Rivers and Harbors Committee
Doc. No.2, 59th Cong., 2d sess.) ; the act of June 25, 1910, provided
for extension of the north jetty 7,000 feet and fixed the length of
the south jetty at 13,734 feet (Rivers and Harbors Committee Doc.
No. 29, 61st Cong., 2d sess.) ; and the acts of August 8, 1917 (H. Doc.
No. 1729, 64th Cong., 2d sess.), and January 21, 1927 (H. Doc. No.
582, 69th Cong., 2d sess.), provide for dredging. The latest pub-
lished map is in the Annual Report for 1916, page 3249.
    Recommnded modifctios of project. Under date of November
  18, 1932, the Chief of Engineers recommended that the existing
   1Exclusive of available   funds.
         RIVERS AND HARBORS-SEATTLE,         WASH.,   DISTRICT    1361
projects for Grays Harbor and bar entrance, Washington, and Grays
Harbor, inner portion, and Chehalis River, Wash., be combined
:under a modified project for Grays Harbor and Chehalis River, so as
to provide for an entrance channel across the bar 600 feet wide and
30 feet deep, to be secured by a south high-tide jetty 13,734 feet long
and a north midtide jetty 16,000 feet long and by dredging; for a
channel 26 feet deep from deep water in Grays Harbor to the Union
Pacific Railroad bridge at Aberdeen, to be 350 feet wide to Grays
Harbor City, thence from 200 to 350 feet wide to Aberdeen; and for
a channel 150 feet wide and 16 feet deep in the Chehalis River from
Cosmopolis to Montesano, subject to certain conditions of local co-
operation. The adoption of this project will increase the mainte-
nance cost to the United States by an estimated amount of $58,000
per annum. (H. Doc. No. 53, 73d Cong., 1st sess.)
    Terminal facilities.-There are 17 sawmill wharves, 9 industrial
wharves, 2 miscellaneous wharves, 1 oil wharf, 1 railroad wharf, and
:2 port terminals, the last 3 being open to the general public. These
facilities are considered adequate for existing commerce. (For fur-
ther details see Port Series No. 7, Corps of Engineers.)
    Operations and results during fiscal year.-Maintenance dredging
was continued intermittently by the U. S. dredges Culebra, Mac-
.kenzie, and Michie, a total of 6 months, 1,214,817 cubic yards being
removed from the bar channel and 117,313 cubic yards from the inner
harbor at a total cost of $104,053.27, including incidental surveys and
repairs. The expenditures were $94,129.64. The United States was
reimbursed by the Port of Grays Harbor for the fuel and lubricating
"oil used on the inner harbor work.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1916. The south jetty was completed in 1902 with a groin
at station 1050. The enrockment slopes from high water to an ele-
vation of minus 12 in a distance of about 4,300 feet. It then rises
irregularly to 3 feet below datum in the next 1,500 feet. From this
point to the end of the jetty it is very irregular, varying from 1 to 10
feet below datum, with an average elevation of about 7 feet below'
datum. The north jetty was completed to midtide elevation in De-
cember 1913. It was later restored and raised to or above ordinary
high water, this work being completed in January 1916. The pres-
ent enrockment slopes from about 12 feet above datum at the high-
water shore line to elevation zero in about 900 feet. From this point
it falls in an irregular manner to 3 feet below datum in the next;
2,600 feet and remains at about this elevation of minus 3 for about
3,300 feet. The last 400 feet of jetty enrockment are at about 1 foot
below datum.
   The controlling depth in the bar channel on June 15, 1934, was 25
feet.
   The costs of the existing project have been $2,567,993.34 for new
work and $2,576,739.89 (not including $15,393.33 contributed funds)
for maintenance, a total of $5,144,733.23. The total expenditures
have been $5,435,542.79 from Federal funds and $15,393.33 from con-
tributed funds.
   Proposed operations.-The balance unexpended June 30, 1934, will
be applied as follows:
1362             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                       1934

Accounts payable June 30, 1934----------------------         - $9, 785. 28
Maintenance dredging of bar channel, with Government plant and
hired labor, July-November 1934 and April-June 1935 ------- 168,529.71

             Total             --------------------------------------------                                            178, 314. 99
  The additional sum of $1,480,000 can be profitably expended
during the fiscal year 1936 for maintenance, as follows:
Dredging of bar channel, with Government plant and hired labor,
July-November 1935 and April-June 1936--------------------            $180, 000'
Construction of a new seagoing hopper dredge to replace the Culebra - 1, 300, 000,
           Total-----------------------------                                                      ----                 1,480,00(

                                             Cost and financial summary

Cost of new work to June 30, 1934 __ ---------___-__    -   -_                                                   $2, 567, 993. 34
Cost of maintenance to June 30, 1934 ----------------------                                                      12, 576, 739'. 89
      Total cost of permanent work to June 30, 1934----------                                                     5,144, 733. 23
Value of plant, materials, etc., on hand June 30, 1934----------                                                    300, 594. 84
      Net total cost to June 30, 1934________________________                                                     5,445, 328. 07
Minus accounts payable June 30, 1934------------------------                                                          9, 785. 28
     Net total expenditures _____________________                                                          __- 5, 435, 542. 79)
Unexpended balance June 30, 1934 __--____ _________                                                         _     178, 314. 99
            Total amount appropriated to June 30, 1934------------5, 613, 857. 78;

       Fiscal year ending June 30                   1930               1931            1932               1933              1984

Cost    of new   work_.          _........                                                                                        -
Cost of maintenance....                               10
                                     ___.....$204, 627.            $165, 362. 18       760.80
                                                                                    $126,           $199,
                                                                                                        928.
                                                                                                           04             $104, 053. 27
                              114, 144. 40 149, 439. 10
Total expended .----------------..............                                       101, 486.36      186, 150.74          94, 129. 64
Allotted_.                ..          ------
                               _----------       104, 500.00        180, 000.00    -109,000.00        336,187. 76           79,075.02'


Balance unexpended July 1, 1933_____________________           ______ $193,369. 61'
Amount allotted from War Department Appropriation
  Act approved April 26, '1934 _______________ $116, 000. 00
Amount allotted from War Department Appropriation
  Act approved July 14, 1932-- ____---__-                  14, 129. 47
                                                                       130, 129. 47
      Amount to be accounted for     --------------------------- 323, 499. 08
Deductions on account of revocation of allotment ________----        _  51, 054. 45
      Net amount to be accounted for
Gross amount expended ______________--____ $274, 984. 55
                                                        ___--___       ____
                                                                       272, 444. 63

Less:
    Reimbursements collected----------    $180, 779. 16
    Receipts from sales -----------              75. 75
                                                          180, 854.91
                                                                        94, 129. 64
      Balance unexpended June 30, 1934----------------------           178, 314. 99
Outstanding liabilities June 30, 1934---------------       $9, 785. 28
Amount covered by uncompleted contracts-----------          3, 787. 91
                                                                        13, 573. 19
      Balance available June 30, 1934________________________          164, 741. 80
Amount that can be profitably expended in fiscal year ending June
30, 1936 for maintenance 2 ----    -1, -        -     -    -                                                          480, 000. 001
   1 In addition, $15,393.33 was expended from contributed funds.
   2 Exclusive       of available funds.
         RIVERS AND HARBORS-SEATTLE,        WASH.,   DISTRICT    1363
3. GRAYS HARBOR, INNER PORTION, AND CHEHALIS RIVER, WASH.

    Location.-See preceding report, " Grays Harbor and bar entrance,
Wash." The inner harbor comprises two main channels, the south
and the north, connecting the harbor proper with the Chehalis River
at Aberdeen. Chehalis River rises in the southwestern part of the
State of Washington, about 40 miles east of the Pacific Ocean, flows
in a general northwesterly direction, and empties into the eastern
part of Grays Harbor. (See U. S. Coast and Geodetic Survey
Chart No. 6195.)
    Previous projects.-The original project for the Chehalis River was
adopted by the River and Harbor Act of August 2, 1882. The orig-
inal project for the inner harbor was adopted by the River and Har-
bor act of July 13, 1892. The cost and expenditures on both projects
prior to the adoption of the existing project in 1907 and 1910 were
'$113,134.38 for new work and $37,415.45 for maintenance, a total
o~f $150,549.83. For further details see pages 2002-2003 of Annual
Report for 1915.
    Existing project.-This provides for a channel 18 feet deep at mean
lower low water and 200 feet wide from deep water in the bay below
IHoquiam to Cosmopolis, on the Chehalis River, a distance of 10 miles,
and for a channel 16 feet deep at mean lower low water and 150
feet wide from Cosmopolis to Montesano, a distance of 1084 miles.
The extreme tidal range at Hoquiam is 16.6 feet. The range between
mean lower low water and mean higher high water is 10.1 feet. The
estimate of cost for new work, revised in 1930, is $661,200, exclusive
of amounts expended on previous projects, but inclusive of $211,500 to
be contributed by local interests. The latest (1928) approved esti-
mate for annual cost of maintenance is $1,000 for the section below
Cosmopolis. Local interests are to maintain the work above Cos-
mopolis.
    The project was adopted by the following river and harbor acts:
The act of March  ,,  1907, provided for the 18-foot channel (H. Doc.
No. 507, 59th Cong., 1st sess.), and the act of June 25, 1910, for the
6-foot channel above Cosmopolis (H. Doc. No. 1125, 60th Cong., 2d
sess.), and the act of July 3, 1930 (H. Doc. No. 315, 70th Cong.,
1st sess.), provided for the 16-foot channel. For the latest published
map see the latter document, and House Document No. 53, Seventy-
third Congress, first session.
    Supplementing the work authorized by Congress, dredging the
river channel to a depth of 26 feet, from 200 to 350 feet wide from
deep water in Grays Harbor to the Union Pacific Railroad bridge
  at Aberdeen, as recommended by the Chief of Engineers in House
Document No. 53, Seventy-third Congress, first session, has been
included in the Public Works program under the National Industrial
Recovery Act.
    Recommended modifications of project.-See preceding report on
 " Grays Harbor and bar entrance."
    Local cooperation.-The port of Grays Harbor contributed a total
of $32,496.12 for dredging in the inner channels prior to 1931. In
January 1919, the commission agreed to undertake the future main-
  tenance of the channels in the inner harbor to a depth commensu-
  rate with that obtained on the outer bar by the United States.
1364   REPORT   OF   CHIEF   OF ENGINEERS,   U.   S.   ARMY,   1934

Under that agreement the commission has expended $845,050, ex-
clusive of $466,388 expended for the maintenance of turning basins
and slips at the public terminals. About 81/2 miles of channel, 200 to
350 feet wide, have been deepened to approximately 26 feet at mean
lower low water and two turning basins have been dredged to the
same depth.
   The River and Harbor Act of July 3, 1930, adopting the 16-foot
channel, provides that local interests contribute one-half the first
cost, estimated at $211,500, and give assurances satisfactory to the
Secretary of War and Chief of Engineers that they will assume the ,
entire cost of maintenance of same, and provide a suitable public
terminal at Montesano. These assurances have been given and
$35,834.27 contributed, which was expended in 1931 with an equal
amount of Government funds in securing a 12-foot channel to,
Montesano, the remaining contribution necessary to complete the
project being deferred until a later date, as approved by the Secre-
tary of War, March 18, 1931.
   The Grays Harbor Port Commission has leased its pipe line dredge
to the United States without charge other than reimbursement for
operating costs, for the dredging under the Public Works program.
   Terminal facilities.-These are included in report on " Grays Har-
bor and bar entrance," except two mill wharves at Montesano, one
of which is open to the public on equal terms under a contract with
the Port of Grays Harbor Commission.
   Operations and results during fiscal year.-No operations were
conducted with regular funds. Under authority of the Federal
Emergency Administration of Public Works, shoal places in the
channel below Aberdeen were dredged to a depth of 26 feet for a
total distance of about 33/4 miles. The work was done with leased:
plant, 542,490 cubic yards being removed, at a cost of $55,926.15
for maintenance. The expenditures were $42,883.
   Condition at end of fiscal year.-The existing project is 41 percent
completed. The 18-foot channel below Cosmopolis and 6-foot chan-
nel between Cosmopolis and Montesano were completed in 1910, and
the latter was deepened to 12 feet in 1931. The controlling depth at
mean lower low water is 26' eiet: below Aberdeen, 21 feet thence to
Cosmopolis, and 10 feet between Cosmopolis and Montesano. The
work remaining to be done is increasing the channel between Cos-
mopolis and Montesano to 16 feet as authorized by the River and
Harbor Act approved July 3, 1930.
   The costs of the existing project under regular appropriations
have been $274,022.52 for new work and $121,631.74 for maintenance,
a total of $395,654.26. The total expenditures have been $395,654.26
from United States funds. In addition, $35,834.27 has been ex-
pended from contributed funds for new work, and $32,496.12 for
maintenance, a total of $68,330.39.
  With Public Works funds, the channel below Aberdeen was deep-
ened to 26 feet in 1934 at a cost of $55,926.15. The expenditures
were $42,883.
  Proposed' operations.-The :funds unexpended :June 30, 1i!934,
amounting to $12,000 is available for,revocation.
   The additional sum of $58,000 can be profitably expended during
the fiscal year 1936 for maintenance dredging in the 26-foot channel
               RIVERS         AND HARBORS-SEATTLE,                                  WASH.,              DISTRICT               1365
below Union Pacific bridge at Aberdeen under the modification of
project authorized by the Federal Emergency Administration of
Public Works, by lease of port dredge, July to November 1935.
                                        Cost and financial sumary

                                MAINTENANCE             AND IMPiROVEMENT                     FUNDS


Cost of new work to June 30, 1934_ --------------                                                                        $387, 156. 90
Cost of maintenance to June 30, 1934 ___________________________                                                          159, 047. 19

         Total cost of permanent work to June 30, 1934-----------546, 204. 09

Net total expenditures__________________________                                                                         546,204. 09
Unexpended balance June 30, 1934___--_---------------                                                                     12, 000. 00

         Total amount appropriated to June 30, 1934_____________                                                         558, 204. 09

    Fiscal year ending June 30                1930                 1931                   1932               1933             1934


Cost of new work_-----.......---------___                          $435.94          $35, 398.32 .....                           __....................
Cost of maintenance.-------------...      .        --------------
                                                         __       ..                        589. 06          _..........
                                                                                                         _........__
       Total cost......-----....------------------------             435.94              35,987.38      ..
Total expended......                                                 396.04              36, 027. 28    -------------------------
Allotted_                                     -$719.    23         50, 000. 00
                                                -----------------------             -10, 000. 00         -$3, 576.68         $12, 000.00


Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934    ------------------------------------    ----- $12, 000

Balance unexpended June 30, 1934-----------------------------                                                                  12, 000

Amount (estimated) required to be appropriated for completion of
existing project - -______-------                       -----                                                               161,500

                                               PUBLIC WORKS FUNDS

Cost of new work to June 30, 1934_
Cost of maintenance to June 30, 1934____                                             _______--------                      $55, 926. 15:

                                                     ---
     Total cost of permanent work to June 30, 1934_______-                                                                 55, 926. 15
Minus accounts payable June 30, 1934 ________________--__                                                                  13, 043. 15

     Net total expenditures _____---------_ -----------                                                                    42, 883.00=
Unexpended balance June 30, 1934_________________----------                                                                15, 117. 00

          Total amount appropriated to June 30, 1934 .__ --- __--                                                   __     58, 000. 00}

         Fiscal year ending June 30                        1930              1931                1932           1933            1934


Cost of new work-----------------                        ----------------------------------------------
Cost of maintenance---.............-----------...---------                 ..-----.....---------------
                                                              ----------.........                      $55, 926. 15
Total expended-------------------------------------                                 --     ----------------------              42,883.00
Allotted.--.-------------------------                  ---------        ---------- ----------------------                      58,000.00

   1In addition $35,834.27 was expended from contributed funds.
   Sni cls iv  f$2'496.12 was :ex~pntded fromi: contrey ulteelfunds.
   .. lxcusive of available funds.
   4 Exclusive of $161,500 to be contributed by local interests.
1366              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

Amount allotted from National Industrial Recovery Act approved
  June 16, 1933---------------------------------  ------------ $58, 000.00
Gross 'amount expended----------------------------------------42, 88. 00

     Balance unexpended June 30, 1934------------------------                                                           15,117.00
Amount covered by uncompleted contracts------------------------                                                         14, 440. 55

              Balance available June 30, 1934--------------------------                                                     676.45

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance ------------------------------------                                                         58, 000. 00

CONSOLIDATED                  COST       AND       FINANCIAL      SUMMARY           FOR    GRAYS      HARBOR,          INNER    POR-
                                                               TION, ETC.


Cost of new work to June 30, 1934----------------------------2 $387, 156. 90
Cost of maintenance to June 30, 1934 --                        "214, 973. 34

       Total cost of permanent work to June 30, 1934------------                                                       602, 130. 24
MIinus accounts payable June 30, 1934---------------------------                                                        13, 043. 15

     Net total expenditures-_ ---------------------------------                                                        589, 087. 09
Unexpended balance June 30, 1934 ----------------------------                                                           27, 117. 00

              Total amount appropriated to June 30, 1934---------------616, 204. 09

        Fiscal year ending June 30                     1930            1931               1932            1933              1934


"Cost    of new work...---------------------------                      $435.94      $35, 398. 32 -----------------.
Cost of maintenance ...------ --..---------- -----------                                    589. 06 -------------          $55, 926. 15
          Total cost --------------.----------                 ----      435. 94       35, 987. 38   ------------           55, 926.15

Total expended__-------------------------                                396. 04       36, 027. 28 --------------           42, 883. 00

Allotted                ----------------
                     ..---.                           -$719. 23       50, 000. 00    -10, 000. 00      -$3, 576. 68         70, 000. 00


Amount allotted from War Department Appropriation Act ap-
proved Apr. 26, 1934_--                                       $12, 000. 00
Amount allotted from National Industrial Recovery Act approved
June 16, 1933       -----   ___         -    --  --            58, 000. 00

              Amount to be accounted for__                                                                              70, 000. 00
Gross amount expended----------------------------------------42,                                                            883. 00
    Balance unexpended June 30, 1934------------------------                                                            27, 117. 00
Amount covered by uncompleted contracts ----------------------                                                          14, 440. 55

              Balance available June 30. 1934___                                                                        12, 676. 45

Amount (estimated) required to be appropriated for completion of
existing project -_______________________________------         161, 500. 00

Amount that can be profitably                                 expended in fiscal year ending
    June 30, 1936, for maintenance 1-                                                                         __        58, 000. 00

                                                 4. QUILLAYUTE RIVER, WASH.

  Location.-This river is formed by the junction of the Soleduck
and Bogachiel Rivers, and flows westerly 5 miles to the Pacific
Ocean at La Push, Wash., about 30 miles south of Cape Flattery.
(See U. S. Coast and Geodetic Survey Chart No. 6102.)
    1Exclusive of available funds.
     SIn addition, $35,834.27 was expended from contributed funds.
    SIn addition, $32,496.12 was expended from contributed funds.
     Exclusive of $161,500 to be contributed by local interests.
                     RIVERS AND HARBORS-SEATTLE,                                    WASH., DISTRICT                     1367
   Existing project.-This provides for a jetty on the easterly side
of the mouth, and a dike, with groins, on the westerly side, with a
view to stabilizing the entrance channel. The length of the section
included in the project is 1,500 feet. The range between mean lower
low water and mean higher high water is 8.8 feet.
   The estimate of cost of new work, revised in 1931, is $84,000 and
 $4,000 annually for maintenance during the first 2 years and $1,000
annually thereafter.
   The project was adopted by the River and Harbor Act of July 3,
1930 (H. Doc. No. 125, 71st Cong., 1st sess.). This document con-
tains the latest map of the locality.
   Local cooperation.-Fully complied with.
    Terminal falcilities.-There are no dockage facilities other than
landing places for small boats.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project is 80 percent
completed. The construction of the jetty and dike was commenced
in April 1931, and completed in October 1931. The groins were
omitted.
   The jetty and dike were damaged by flood and storm during the
first winter so that it was found necessary to restore them and to
reinforce the revetment at the shore end of the jetty. This work
was completed in October 1932, the end of the jetty having been
built up to 16 feet above mean lower low water. On June 8, 1933,
the dike was found to have subsided about 3 feet in the middle of
the length and the end of the jetty to have subsided about 12 feet,
it being about 4 feet above mean lower low water. The controlling
depth in the entrance channel was found to be 8 feet on that date.
   The work remaining to be done to complete the project is con-
struction of the groins based on the dike and James Island.
   The costs and expenditures have been $68,000 for new work and
$32,350.73 for maintenance, a total of $100,350.73.
   Proposed operations.-No funds are available, and no work is con-
templated for the fiscal year 1935.
   The sum of $8,000 can be profitably expended during the fiscal
year 1936 for repairing the jetty and dike by contract, July-
August 1935. The work will be necessary to maintain the dike and
jetty.
                                              Cost and fincnia summary

Cost of new work to June 30, 1934_ ..     .---                                                                  $$68,000.00
Cost of maintenance to June 30, 1934----------------------------                                                 32, 350. 73

            Total cost of permanent work to June 30, 1934-------------                                          100, 350. 73

Net total expenditures ------                                      100, 350. 73
Total amount appropriated to June 30, 1934----------------------100,    350. 73

            Fiscal year ending June 30                     1930             1931          1932           1933           1934


Cost of new work.........--------------          ------------- $13, 136. 24 :$54,863. 76               ........ ..........
Cost of maintenance------------                     -----------------------------
                                                  .....                                               $32, 350. 73 ..

Total   expended---------------------------                                6, 563. 28   61, 436. 72    32, 350. 73 _--___
Allotted--,----------- ---------------------                             72, 000. 00    31, 000. 00   -2, 649. 27   ------------
1368    REPORT     OF CHIEF OF          ENGINEERS, U.           S. ARMY,     1934

Amount (estimated) required to be appropriated for completion of
existing project----------------------------------------------  $16, 000
Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance-------------------__ ____--                                 8, 000

       5. PUGET SOUND AND ITS TRIBUTARY WATERS, WASH.

  Location.-Puget Sound is located in the western part of the State
of Washington. (See U. S. Coast and Geodetic Survey Charts Nos.
6300, 6450, and 6460.)
   Previous projects.-Adopted by the River and Harbor Act of
August 2, 1882. The cost and expenditures under this project were
$67,495.58 for maintenance prior to adoption of the existing project
in 1892. For further details see page 2003 of Annual Report for
1915.
   Existing project.-This provides for maintenance of the rivers
tributary to Puget Sound by snagging and dredging. The latest
 (1928) approved estimate for annual cost of maintenance is $25,000.
The existing project was adopted by the River and Harbor Act of
July 13, 1892. (Annual Report for 1893, p. 3425.) The latest
published map is in the Annual Report for 1913, page 3127.
   Terminal facilities.-The terminal facilities at the numerous lo-
calities on Puget Sound and its tributary waters are in general
considered adequate for existing commerce.
   Operations and results during fiscal year.-The U. S. snagboat
W. T. Preston operated 12 months in the waters tributary to Puget
Sound, removing 2,710 snags, 283 piles, 105 trees, 3,722 tons of
rock, dredging 27,108 cubic yards of material, placing channel mark-
ers, disposing of derelict hulks, etc. The work was done by hired
labor at a cost of $27,232.09, all for maintenance. The total ex-
penditures were $16,367.90.
  Condition at end of fiscal year.-The work has consisted chiefly
of snagging and dredging in the principal tributaries of Puget
Sound. No permanent results are obtainable, but the maintenance
of existing channels requires practically continuous operation of
the snagboat. The controlling depths range from 1 to 40 feet at
:mean lower low water. The costs have been $43,336.92 for new
work and $717,936.36 for maintenance, a total of $761,273.28. The
total expenditures have been $805,974.03.
   Proposed operations.-The funds unexpended June 30, 1934, will
be applied as follows:
Accounts payable June 30, 1934 ___________________________________                 $1, 065. 96
Maintenance    dredging and snagging with Government plant and
hired labor   throughout the year         --           ___________        _ ___   25, 162. 32

       Total ________      _______----------------_--                              26, 228. 28

   The additional sum of $25,000 can be profitably expended during
the fiscal year 1936 for maintenance, dredging, and snagging with
Government plant and hired labor throughout the year, the work
;being necessary to keep the project channels open for navigation.
             RIVERS AND IIARBORS-SEATTLE,                            WASH.,           DISTRICT              1369
                                Cost and financial summary
Cost of new work to June 30, 1934-----------------------------                                     $43,336. 92
Cost of maintenance to June 30, 1934-- -------------------                                         785, 431. 94

      Total cost of permanent work to June 30, 1934          --     828, 768. 86
Value of plant, materials, etc., on hand June 30, 1934--------------45, 76. 71

        Net total cost to June 30, 19,34-----                                                       874, 535. 57
Minus accounts payable June 30, 1934              -          -----                                       1, 065. 96

     Net total expenditures--------                                                                 873, 469. 61
Unexpended balance June 30, 1934___________________--__                                              26, 228. 28

        Total amount appropriated to June 30, 1934.                                                 899. 697C80D

        Fiscal year ending June 30         1930              1931             1932          1933            1934


Cost of new work---------
Cost of maintenance_                   $10, 570. 30   $14, 478. 71        $18, 072. 37   $23, 809. 75     $27, 232. 09
Total expended----                       6, 986. 43    12, 723. 67         21, 642. 86    21, 978. 03      21, 473. 75

Allotted_                              -6, 000. 00     20, 000.00         --              23, 608.37       22, 400. 00


Balance unexpended July 1, 1933_
                               ----------------------------    $21, 122.43
Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934-----------------------------------------------   22, 400. 00

      Amount to be accounted for__ _______________----___--                                             43, 522. 43
Deductions on account of revocation of allotment -                                                          926. 25

      Net amount to be accounted for---------------------------42,                                          596. 18
Gross amount expended_                                $19, 037.95
Less reimbursements collected                           2, 670. 05
                                                                                                        16, 367. 90

      Balance unexpended June 30, 1934                               --              __-----            26, 228. 28
Outstanding liabilities June 30, 1934                  ---                           $1, 065. 96
Amount covered by uncompleted contracts--                                                118. 62
                                                                                                         1, 184. 58

        Balance available June 30, 1934                                   -----                         25, 043. 70

Amount that can be profitably expended in fiscal year ending June
  30, 1936, for maintenance 1 __.-          -           -_-_
                                                         _   _ _ ________                               25, 000. 00

                              6. OLYMPIA HARBOR, WASH.

   Location.-This harbor is near the southern end of Puget Sound
at the head of Budd Inlet, about 45 miles southwest of Tacoma.
 (See U. S. Coast and Geodetic Survey Chart No. 6462.)
   Existing project.-This provides for a channel on the east side of
the harbor, 26 feet deep at mean lower low water and 250 feet wide,
from deep water in Budd Inlet to the bend, and the same depth and
200feet-wide from the bend to a point 6,000 feet from Fourth Street
in Olympia, and 12 feet deep and 250 feet wide thence to Fourth
Street, with a turning basin 500 feet wide at the inner end, and a
channel 12 feet deep at mean lower low water and 200 feet wide on
the west side of the harbor, with a turning basin 800 feet long and
    Exclusive of available funds.
1370    REPORT   OF CHIEF OF   ENGINEERS, U.    S. ARMY,   1934


400 feet wide. The extreme tidal range is 21 feet. The range be-
tween mean lower low water and mean higher high water is 14.8,
feet. The estimate of cost for new work, revised in 1930, was $267,-
800. The latest (1930) approved estimate for annual cost of
maintenance is $2,500.
    The project was authorized by the following river and harbor
acts: The acts of July 13, 1892 (H. Doc. No. 32, 52d Cong., 1st sess.,
and Annual Report for 1892, p. 2733), January 21, 1927 (H. Doc.
No. 244, 69th Cong., 1st sess.), and July 3, 1930 (Rivers and Harbors
Committee Doc. No. 5, 71st Cong., 1st sess.), provided for the channel
on the east side of the harbor, and the act of June 25, 1910, pro-
vided for the channel on the west side of the harbor (H. Doc. No.
405, 59th Cong., 1st sess.). The latest published map is in Rivers
and Harbors Committee Document No. 21, Seventy-third Congress,
second session.
    Supplementing the work authorized by Congress, the dredging
of a channel between deep water in Budd Inlet and the port terminal,
30 feet deep and generally 300 feet wide, with suitable additional
width at the bend, and a turning basin adjacent to the port terminal
30 feet deep, 2,000 feet long and 800 feet wide, as recommended by
the Chief of Engineers in Rivers and Harbors Committee Document
No. 21, Seventy-third Congress, second session, has been included in
the Public Works program under the National Industrial Recovery
Act.
   Recommended modifications of project.-Under date of October
13, 1933, the Chief of Engineers recommended that the existing
project for Olympia Harbor be modified so as to provide:
    (a) Elimination of the provision for a channel on the east side
of the harbor, 12 feet deep and 250 feet wide, extending from the
inner end of the entrance channel to Fourth Avenue, with a turning
basin 500 feet wide on the inner end.
    (b) Elimination of the provision for a channel on the west side
of the harbor, 12 feet deep and 200 feet wide, with a turning basin
800 feet long and 400 feet wide.
    (c) A channel between deep water in Budd Inlet and the port
terminal, 30 feet deep and generally 300 feet wide, with suitable ad-
ditional width at the bend (included in Public Works program), and
a turning basin, adjacent to the port terminal, 30 feet deep, 2,000 feet
long, and 800 feet wide, all at an estimated cost of $92,000 for new
work, with $1,500 annually for maintenance. (Rivers and Harbors,
Committee Doc. No. 21, 73d Cong., 2d sess.)
   Local cooperation.-Complied with.
   Termninal facilities.-There are 10 wharves, 1 a publicly owned
terminal, and 9 privately owned. These facilities are considered
adequate for existing commerce. (For further details see Port Se-
ries No. 23, Corps of Engineers.)
   Operations and results during fiscal year.-No operation con-
ducted with regular funds. As authorized by the Federal Emer-
gency Administrator of Public Works, the dredging of the 30-foot
channel and turning basin was.commenced under contract on April
10, 1934, a total of 524,000 cubic yards being removed to the end of
the fiscal year at a cost of $76,649.57, all for new work. The expendi-
tures were $55,469.23.
               RIVERS AND HARBORS-SEATTLE,                                                  WASH.,                  DISTRICT                    1371
  Condition at end of fiscal year.-The existing project as adopted
by Congress was completed in 1931 at a saving of $9,788.70 under
the estimated cost. The project depths are available. The costs
and expenditures from regular appropriations have been $258,011.30
for new work and $14,487.72 for maintenance, a total of $272,499.02.
  The dredging of the 30-foot channel as authorized by the Public
Works Administration was 85 percent completed on June 30, 1934,
the controlling depth being 26 feet. The costs were $76,649.57 for
new work and the expenditures $55,469.23.
   Proposed operations.-The unexpended balance of allotment from
the National Industrial Recovery Act, including additional funds
made available this fiscal year, will be applied to new work, as
-follows:
Accounts payable June 30, 1934 _______________________________ $21, 180. 34
Continuing work of dredging 30-foot channel and basin under con-
  tract, July-August 1934--___--------------------------------   28, 817. 43

          Total ---------                       --------------------------------- 49, 997. 77

                                          Cost      and          finanial summary
                                 MAINTENANCEG                  AND IMPROVEMENT FUNDS

Cost of new work to June 30, 1934__--_--- ______--_________  $258, 011. 30
Cost of maintenance to June 30, 1934------------------------- 14, 487. 72

      Total cost of permanent work to June 30, 1934__________                                                                          272, 499. 02
Net total expenditures_-------------------       --------                                                                              272, 499. 02
Total amount appropriated to June 30, 1934__________-- __-__                                                                           272, 499. 02

         Fiscal year ending June 30                                1930          1931                 1932                     1933             1934


,Cost of new work        ....------------------------                         $46, 247. 48                       --       -      --           ---
Cost of maintenance .--------------------------------
Total expended.--------------------------------46, 247. 48                                        -
Allotted.......        ......--------
                               ...--..--------......-       -$1, 500. 00       46, 000. 00


                                                 PUBLIO WORKS                  FUNDS


Cost of new work to June 30, 1934-------------------------$76, 649. 57
Cost of maintenance to June 30, 1934____ .______   ___                                                                                 -.......
      Total cost of permanent work to June 30, 1934 ______.___-                                                                          76, 649. 57
Minus accounts payable June 30, 1934 _______--____           __-                                                                         21, 180. 34
      Net total expenditures - ________________-
                                   -            -                                                           -             -__            55, 469. 23
Unexpended balance June 30, 1934___--_-_-_------.....                                                                                    36, 530. 77
         Total amount appropriated to June 30, 1934 .-- ______..__                                                                       92, 000. 00

         Fiscal year ending June 30                                1930          1931                 1932                      1933            1934
                                                    ...-,    - - -- -- - -,       _ _           ..    . .       .     -

Cost of new work-----------                     ---------------------------------------------                                                  76, 649. 57
Cost of maintenance.

          •
        maintl
Cost ofexpenanded---------------------------------------
Total expended------                                         ""'
                                                            -....                  --- --        - -------
                                                                                                                          ..........-
                                                                                                                              -------------    55, 469.----23
                                                                                                                                               92,000.00
                                                                                                                                               55, 4  23--------------------
Allotted ...................................                                   _, __,_,1 __ _, __ __I_, _-,i:                            _     9 , 00 0
1372       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

Amount allotted from National Industrial Recovery Act approved
  June 16, 1933--------------                                  $92, 000. 00
Gross amount expended----------------     -------------------   55, 469. 23
    Balance unexpended June 30, 1934______________________  36, 530. 77
Amount covered by uncompleted contracts--------------------36, 530. 77

Amount allotted by the Public Works Administration, Emergency
  Appropriation Act, fiscal year 1935--____----------------                                            13, 467.00
Balance available for fiscal year 1935-----------------------                                          13, 467.00
   CONSOLIDATED       COST AND FINANCIAL            SUMMARY           FOR OLYMPIA         HARBOR,       WASH.

Cost of new work to June 30, 1934_ ________-   _______--    $334, 660. 87
Cost of maintenance to June 30, 1934------------------------ 14, 487. 72

     Total cost of permanent work to June 30, 1934-----------                                         349, 148.59;
Minus accounts payable June 30, 1934_____________--_---                                                21, 180. 34

     Net total expenditures__
                            -----------------                                                         327, 968. 25
Unexpended balance June 30, 1934_ --                                                                   3_____----____-___
                                                                                                       36, 530. 77

        Total amount appropriated to June 30, 1934                            -----      ___-_        364, 499. 02

        Fiscal year ending June 30                1930         1931             1932        1933           1934


Cost of new work._                _                        $46, 247. 48 ---------------------
                                           ....------------------------                            $76, 649. 57
Cost of maintenance---------------------------------------------          ----------------------------------
Total expended-----------------------------------            46, 247. 48 ------------     ---------       55, 469. 23

Allotted..--------                      $1,500. 00
                             --------------                  46,000. 00---------------------              92,000. 00

Amount allotted from National Industrial Recovery Act approved
  June 16, 1933 --------------------------                            $92, 000. 00=
Gross amount expended              ----------------------------------  55, 469. 23

    Balance unexpended June 30, 1934_ ....                            __....----------                 36, 530. 77
Amount covered by uncompleted contracts ----                           ___        __---___             36, 530. 77
Amount allotted by Public Works Administration Emergency Ap-
propriation Act, fiscal year 1935---------------------------                                          13, 467. 00
Balance available for fiscal year 1935______________________                                           13, 467. 00

                                7. TACOMA HARBOR, WASH.

  Location.-This harbor embraces all of Commencement Bay, an,
arm of Puget Sound, 30 miles south of Seattle. (See U. S. Coast
and Geodetic Survey Chart No. 6451.)
  Existing project.-This provides for (a) a city waterway having
a channel 500 feet wide and 29 feet deep at mean lower low water
from deep water in Commencement Bay to the Eleventh Street
Bridge, 500 feet wide and 22 feet deep to the Fourteenth Street
Bridge, and varying from 500 to 250 feet wide and 19 feet deep from
the Fourteenth Street Bridge to the end of this waterway, a total
length of 8,500 feet; (b) for a channel 500 feet wide, 3,650 feet
long, and 32 feet deep at mean lower low water in the Puyallup,
Waterway after the Puyallup River shall have been diverted there-
from by local interests; and (c) for a channel in Hylebos Waterway
200 feet wide and 30 feet deep from Commencement Bay to Lincoln
Avenue, a distance of about 10,000 feet, thence 150 feet wide and P2R
         RIVERS AND HARBORS-SEATTLE,       WASH.,   DISTRICT    1373
feet deep to the head of the waterway,.a distance of about 3,000 feet.
The extreme tidal range is 18.8 feet. The range between mean lower
low water and mean higher high water is 11.8 feet.
   The estimate of cost for new work, revised in 1905, is $150,000 for
the city waterway, $640,000 (revised in 1925) for the Puyallup
Waterway, and $136,000 (made in 1930) for Hylebos Waterway, or a
total of $926,000. The latest (1928) approved estimate for annual
cost of maintenance of city waterway is $5,000. Puyallup Waterway
will be maintained by local interests. The estimated (1930) cost of
maintenance of Hylebos Waterway is $12,000 annually for the first
2 years and nominal expenditure after that time.
   The project was adopted by the following river and harbor acts:
The act of June 13, 1902, provided for the city waterway (H. Doc.
No. 76, 56th Cong., 2d sess.); the act of March 3, 1905, provided for
the Puyallup Waterway (H. Doc. No. 520, 58th Cong., 2d sess.) ; the
act of June 25, 1910, required the diversion of Puyallup River (S.
Doc. No. 418, 61st Cong., 2d sess.) ; and the act of July 3, 1930,
provided for the Hylebos Waterway (Rivers and Harbors Committee
Doec. No. 25, 71st Cong., 2d sess.). The latest published maps of the
locality are in the last-named document. on page 2540, Annual Report
for 1905, and in House Document No. 167, Seventy-second Congress,
first session.
   Supplementing the work authorized by Congress, the construction
of two training walls each about 700 feet long, at the mouth of
Puyallup River, as recommended by the Chief of Engineers in Rivers
and Harbors Committee Document No. 55, Seventy-second Congress,
second session, has been included in the Public Works program under
the National Industrial Recovery Act.
   Recommended modifications of project.-Under date of March 2,
1933, the Chief of Engineers recommended the following modifica-
tions to the existing project for Tacoma Harbor:
   (a) Abandonment of the project for improving Puyallup Water-
way.
   (b) Construction of two training walls, each about 700 feet long
at the mouth of Puyallup River, at an estimated cost of $50,000
with $2,500 annually for maintenance. (Included in Public Works
program.)
   (c) Maintenance by the United States of a channel in Wapato
Waterway to within 50 feet of the pierhead lines; this channel to be
700 feet wide and 34 feet deep over such length as shall have been
dredged at the expense of local interests to dimensions stated, at
an estimated annual cost for maintenance of $1,000. (Rivers and
Harbors Committee Doc. No. 55, 72d Cong., 2d sess.)
   Local cooperiation.-Fully complied with, except as follows:
   Under the provisions of the River and Harbor Act of June 25.
1910, local interests are required to divert Puyallup River from
Puyallup Waterway before the improvement by the United States
may be continued. This has not been done.
   Terminal facilities.-There are 64 wharves and piers at Tacoma.
Of these, 18 are located, on Commencement Bay, 26 on city waterway,
3 on middle waterway, 4 on Milwaukee Waterway, 6 on Wapato
1374   REPORT   OF   CHIEF OF ENGINEERS,    U.   S.   ARMY,   1934


Waterway, and 7 on Hylebos Waterway. Thirty-three of them, with
21,855 feet of berthing space, are suitable for the use of ocean-
going carriers; 9 of this class are general cargo terminals engaged
in foreign and domestic business and are open to public use on equal
terms.
   These facilities are considered adequate for existing commerce.
(For further details see Port Series No. 7, pt. 2, Corps of Engineers.)
   Operations and results during fiscal year.-Under regular appro-
priations, maintenance dredging under contract was done in Hylebos
Waterway in January 1934, a total of 33,100 cubic yards being re-
moved. The costs and expenditures were $8,987.88.
   Under authority of the Federal Emergency Administrator of
Public Works, two training walls at the mouth of Puyallup River
were completed February 14, 1934, under contract. The costs and
expenditures were $51,609,12, all for new work.
   Condition at end of fiscal year.-The existing project as adopted
by Congress is 47 percent completed.
   The city waterway was completed in 1905. Project depths obtain
except within 25 feet of the wharves and in the upper 300 feet of
the waterway and a shoaling of 1 foot over a distance of 600 feet
immediately below Eleventh Street, and between Eleventh and Four-
teenth Streets, and shoaling of 2 feet above Fourteenth Street. The
cost of new work on this waterway has been $150,018.58 and of
maintenance $96,928.04, a total of $246,946.62, not including $5,000
expended for maintenance from contributed funds.
   The Hylebos Waterway was completed in 1931. The cost of this
waterway has been $124,085.51 for new work and $8,987.88 for main-
tenance, a total of $133,073.39. The project depths are available
except in the upper 200 feet of the waterway.
   Work on the Puyallup Waterway was commenced in 1908 and
suspended in April 1910. In November 1909, the channel excavated
was practically obliterated by filling caused by a flood in the Puyal-
lup River. The River and Harbor Act of June 25, 1910, authorized
the suspension of work and directed that no further work be done
on this project until local interests diverted the Puyallup River from
the waterway or otherwise prevented excessive deposits therein.
The waterway has shoaled to its original condition, and no navi-
gation. is possible except small boats towing logs at high tide. The
cost of new work on this waterway has been $159,584.46, and of
maintenance $4,415.54, a total of $164,000.
   Except for the Puyallup Waterway the project is completed.
   The costs of the existing project as adopted by Congress have been
$433,688.55 for new work and $110,331.46 for maintenance, a total
of $544,020.01, not including $5,000 contributed funds for mainte-
nance. The total expenditures from regular appropriations have
been the same.
  As authorized by the Federal Emergency Administration of
Public Works, two training walls at the mouth of Puyallup River
were completed in 1934 at a cost and expenditure of $51,609.12, all
for new work.
  Proposed operations.--No funds are available, and no operations
are proposed during the fiscal years 1935 and 1936.
                   ,RIVERS AND HARBORS-SEATTLE,                                           WASH.,              DISTRICT             1375
                                               Cost and financial summnary
                                      MAINTENANC:I             AND IMPROVEMENT                    FUNDS


Cost of new work to June 30, 1934_________________ __-- __   $433, 688. 55
Cost of maintenance to June 30, 1934------------------------ 110, 331. 46

      Total cost of permanent work to June 30, 1934           544, 020. 01                          -----------
Net total expenditures-----------------       ------------    544, 020. 01
Total amount apropriated to June 30, 19345------------------5 544, 020. 01

     Fiscal year ending June 30                      1930                   1931                1932             1933             1934

Cost of new work .-.-------------                      ....           $90, 595. 73        $33, 489. 78       .............
Cost of maintenance              .--------..          $426. 40             36, 485. 13 ---------------------------                $8, 987. 88
        Total cost-        .--.-----------              426. 40       127, 080. 86         33, 489. 78 --------------              8,987. 88
Total expended------------------                        426. 40            91, 442. 56     69, 128.08       --------------         8, 987. 88
Allotted---------...........-----------              4, 500. 00       161, 000. 00       -11,     467. 87                          8, 987. 88



Amount allotted from War Department Appropriation Act approved
  July 14, 1932     ------------------------------------------                                                                 $9, 000. 00
Deductions on account of revocation of allotment_--            ....---                                                              12. 12
      Net amount to be accounted for---------------                                                         ----------           , 987. 88
Gross amount expended               _______________
                             ------------                                                                   $9, 013.68
Less reimbursements collected_---   -____--25.                                                                      80
                                                                                                                                8, 987. 88
Amount (estimated) required to be appropriated for completion of
existing   project___________
     existing-project              _____________
                       ---------------------------------------    480, 000.00
                                                                 4000.0
                                                     PUBLIC WORKS FUNDS

Cost of new work to June 30, 1934_                                                                                            $51, 609. 12
Cost of maintenance to June 30, 1934-.........
Total cost of permanent work to June 30, 1934-----------------                                                                 51, 609. 12
Net total expenditures   ------------------------------------                                                                  51, 609. 12
Total amount appropriated to June 30, 1934------------------_                                                                  51, 609. 12

     Fiscal year ending June 30                      1930                   1931                1932             1933             1934


Cost of new work..--------------------                             -------------------------------------                         $51, 609.12
Cost of maintenance___
Total expended--------------------------------------------------..------                                                          51, 609. 12

Allotted----------                    -----------------------------------------------------...                          ...       51,609. 12



Amount allotted from National Industrial Recovery Act approved
  June 16, 1933----------    -----------------------------      $56, 000. 00
Deductions on account of revocation of allotment-____---   ____   4, 390. 88
      Net amount to be accounted for-   -- __    ____---------                                                                 51, 609. 12
Gross amount expended--      -------------------------------                                                                   51, 609. 12
   1 In addition $5,000 was expended from contributed funds.
           91536-ENG 1934-                    87
1376         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                       19 3 4

      CONSOLIDATED COST AND FINANCIAL SUMMARY                               FOR TACOMA HARBOR,                         WASH.

Cost of new work to June 30, 1934-------------------------1   $485, 297. 67
Cost of maintenance to June 30, 1934------------------------- 110, 331. 46

      Total cost of permanent work to June 30, 1934------------                                                        595, 629. 13
Net total expenditures-----------------------------------                                                              595, 629. 13
Total amount appropriated to June 30, 1934-------------------                                                          5915, 629.13

    Fiscal year ending June 30                1930            1931              1932                  1933                 1934

Cost of new work. ---------------------                    $90, 595. 73      $33, 489. 78 ---------            .          $51, 609. 12
Cost of maintenance------------                $426.40                    --------------
                                                            36,485. 13 ..............                                       8, 987. 88

      Total cost.. ----------             -     426. 40    127, 080. 86        33, 489. 78 --------- --.                   60, 597. 00
Total expended....                              426. 40     91, 442. 56        69, 128. 08       ___               _       60, 597. 00

Allotted-- ---------------------              4, 500. 00   161, 000. 00     -11,467. 87      --------------                60, 597. 00


Amount allotted from War Department Appropriation Act approved
July 14, 1932---------------------------------------------                                                                $9, 000
Amount allotted from National Industrial Recovery Act approved June
16, 1933----------------.------------------.-                                                                             56, 000

      Amount to be accounted for-___----------- ----------------------                                                     65, 000
Deductions on account of revocation of alloment--------------------                                                         4, 403

       Net amount to be accounted for--------------------------                                                            60, 597
Gross amount expended--------------                             $60, 622.80
Less reimbursements collected----------------------------             25. 80
                                                                                                                           60, 597

Amount (estimated) required to be appropriated for completion of
existing project------------------------------------------------ 480, 000

                                  8. SEATTLE HARBOR, WASH.

   Location.--This harbor includes all waterways within the city
limits of Seattle. The chief anchorage basin is Elliott Bay, an arm
of Puget Sound, 30 miles north of Tacoma. (See U. S. Coast and
Geodetic Survey Chart No. 6445.)
   Existing project.-This provides for maintenance of the east and
west waterways to a depth of 34 feet at mean lower low water, with
a width of 750 feet for distances of 6,500 and 5,200 feet, respectively,
from the pierhead line in Elliott Bay, and for dredging the Duwam-
ish waterway 200 feet wide and 30 feet deep at mean lower low water
between the west waterway and First Avenue South, 150 by 20 feet
between First and Eighth Avenues South, thence 150 by 15 feet to a
point about 1.4 miles above Fourteenth Avenue South Bridge, with a
turning basin 600 by 350 feet and 20 feet deep just south of the First
Avenue South Bridge, and a turning basin 500 by 250 feet and 15
feet deep and settling basin with capacity of about 100,000 cubic
yards, at the upper end of the waterway, a distance of 27,060 feet,
or 5.12 miles.
   The total length of waterways included under the project is 7.34
miles. The range between mean lower low water and mean higher
high water is 11.28 feet.
   The estimate of cost for new work, revised in 1930, was $381,000,
of which $140,476 was to be contributed by local interests. The
  1 In addition $5,000 was expended from contributed funds.
         RIVERS AND HARBORS-SEATTLE,        WASH.,   DISTRICT    1377

latest (1928) approved estimate of annual cost of maintenance is
 $4,000 for the east waterway, $6,000 for the west waterway. The
latest (1922) approved estimate for annual cost of maintenance is
 $48,000 for the Duwamish waterway.
    The project was adopted by the following river and harbor acts:
The act of March 2, 1919 (S. Doc. No. 313, 65th Cong., 3d sess.),
provided for maintenance of the east and west waterways 34 feet
deep, and of the Duwamish waterway, 20 feet deep and 150 feet wide,
as far south as the Eighth Avenue South Bridge; and the acts of
March 3, 1925 (H. Doc. No. 108, 68th Cong., 1st sess.), and of July
3, 1930 (H. Doc. No. 126, 71st Cong., 2d sess.), provided for enlarg-
ing the Duwamish waterway. The latest published maps of the
locality are in the last-mentioned document and in House Document
No. 211, Seventy-second Congress, first session.
    Reconommended modifications of project.---Under date of January 5,
1932, the Chief of Engineers recommended modification of the exist-
ing project so as to provide, in addition to the work now authorized,
for the maintenance of east waterway north of Spokane Street, 700
feet long and 400 feet wide, to a depth of 34 feet, and for the main-
tenance of a turning basin, including the head of the east waterway
at the junction of the waterways south of the Chicago, Milwaukee,
St. Paul & Pacific Railway bridge, to a depth of 30 feet, all at an
estimated cost of $4,750 annually, an increase of $750 over the cost
of maintaining the existing project, subject to certain conditions of
local cooperation. (H. Doc. No. 211, 72d Cong., 1st sess.)
    Local cooperation.-Complied with.
    Terminal facilities.-There are 90 piers and wharves located in
Seattle, exclusive of those on Salmon Bay, Lake Union, and Lake
Washington, which are given under " Lake Washington Ship Canal."
Fifty-two are located on Elliott Bay, 16 on east waterway, 6 on west
waterway, 15 on Duwamish waterway, and 1 on Shilshole Bay; 33
of them are commercial terminals open to public use on equal terms,
3 of which serve grain elevators. The present facilities are believed
to be adequate for the existing commerce. (For further details
see Port Series No. 7, Corps of Engineers.)
    Operations and results during fiscal year.-Survey of Duwamish
waterway above Fourteenth Avenue South was made in December
1933. There were no other operations, and no costs or expenditures
were charged to this project.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1931, except the settling basin. The controlling depths
when last ascertained were as follows: East waterway, 34 feet ex-
cept in southwest corner and along east side; west waterway, 34
feet except at sides, in April 1932; Duwamish waterway, below
First Avenue South, 29 feet in October 1931; First to Eighth Ave-
nue, 16 feet; thence to Fourteenth Avenue, 10.1 feet; above Four-
teenth Avenue, 5.3 to -4.5 feet, in July 1934.
   The total costs and expenditures have been $169,442.46 from
Federal funds and $69,332.64 from contributed funds for new
work, and $51,028.47 from Federal funds for maintenance, a total
of $220.470.93 from Federal funds and $69,332.64 from contributed
funds.
1378       REPORT         OF CHIEF OF             ENGINEERS,         U.   S.   ARMY,        1934

  Proposed operations.-The funds unexpended June 30, 1934
($88,405.15), will be applied to maintenance dredging in Duwamish
waterway under contract, October 1934-February 1935.
  The sum of $40,000 can be profitably expended during the fiscal
year 1936 for maintenance dredging in Duwamish, east and west
waterways, by contract, July-October 1935.
                                    Cost and financial summary

Cost of new work to June 30, 1934----------------------- -                                      $169, 442. 46
Cost of maintenance to June 30, 1934--__------------                                              51,028. 47
        Total cost of permanent work to June 30, 1934------------                                 220,470. 93

Net total expenditures                                                                                  470. 93
                                                                                                  2------------------------------
Unexpended balance, June 30, 19341111111111111111111111                                            88, 405. 15

         Total amount appropriated to June 30, 1934--------------                                 308, 876.08

   Fiscal year ending June 30            1930          1931            1932          1933              1934


Cost of new work--__---------          $24, 538. 70     $199. 49    $33, 657. 15
Cost of maintenance ------------        10, 695. 96    1,441. 19         921. 99   $25, 943. 77_______

      Total cost____-----------       - 35, 234. 66    1,640. 68     34, 579. 14    25,943.77

Total expended-__----------             50, 475. 24    1, 680. 12    34, 463. 16    26, 074. 75

Allotted-----------------------          8, 000. 00   95, 026. 89   -80, 000. 00    53, 849. 19           $54, 001


Balance unexpended July 1, 1933------------------------------_ $34, 405.15
Amount allotted from War Department Appropriation Act ap-
  proved July 14, 1932-                                             000. 00
                                                                5----------------------------

         Amount to be accounted for------------------------------88,405.15

Balance unexpended                June 30, 1934_                                                   88, 405. 15

Amount (estimated) -required        to be appropriated for completion
                         --- --- -- --- --- -- --- -- --- -- --- --- -- -- -
of existing project 2 3                                                                           10, 000. 00

Amount that can be profitably - expended            in fiscal year ending
June 30, 1936, for maintenance 2 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -      40, 000. 00

                      9. LAKE WASHINGTON SHIP CANAL, WASH.

  Location.--This improvement lies entirely within the city of
Seattle and extends from Puget Sound through Shilshole Bay,
Salmon Bay, Lake Union, Portage Bay, and Union Bay to deep water
in Lake Washington. (See U. S. Coast and Geodetic Survey Chart
No. 6447.)
  Previous projects.-Adopted by the River and Harbor Act of Au-
gust 18, 1894, and modified by the River and Harbor Act of June 13,
1902. The cost and expenditures on the original and modified proj-
ect prior to commencement of operations under existing project in
1910 were $485,002.45, all of which was for survey and improvement
by dredging. For further details see page 2003, Annual Report for
1915.
    In addition, $69,332.64 was expended from contributed funds.
   2Exclusive of available funds.
    In addition, local interests are to contribute $10,000.
                RIVERS      AND HARBORS-SEATTLE,                     WASH.,       DISTRICT            1379

  Existing project.-This provides for a double lock and fixed dam
with movable crest and necessary accessory works at the Narrows at
the entrance to Salmon Bay, approximately 114 miles from deep
water in Puget Sound; for a channel 34 feet deep at mean lower low
water and 300 feet wide from Puget Sound to the Great Northern
Railway bridge, about 5,500 feet, with a passing basin and log basin
at the turn below the railway bridge; thence 34 feet deep and 150
to 200 feet wide to the locks, about 900 feet; and a guide pier 600
feet long; for the revetment of the canal banks between the locks and
Lake Union and between Lakes Union and Washington; and for
the excavation by King County or other local agency of a channel
25 feet deep at low water and 75 feet wide at the bottom from the
locks into Lake Washington.
  The following table shows the principal features of the double
lock and dam. (The structures are located at Seattle, Wash.)

                                                                                      Large lock   Small lock


Miles above mouth ............                                          - --                  1%             1%
Clear width of chamber-..... -             .                           ..--  feet.-          80           30
Maximum available length ------------------------------------------- do .--                 760          123
Lift-.........    ------------------------------------------                do               26           26
Depth on upper miter sill 1-.................          ---------------      do               36           16
Depth on intermediate miter sill 2                        ----------        do --            29
Depth on lower miter sill 2_______________________do                                         29              16
Character of foundation..-----------------------------------------------                  Clay         Clay
Kind of dam .             -------------------------------------------------               (3)          ()
Type of construction----------------------......
                                 ..-----------------------                               (4)           (4)
Year completed- ...--            - ..          -...
                                               ..
                           .- __.................                   .                     1916          1916
Cost--..      ....-------------------------------------------------                      (1)           (5)

  1 Low water in upper pool.
  2 Mean lower low water in Puget Sound.
  3 Fixed dam with movable crest.
  4 Concrete.
  5   The cost of double lock and dam was $2,224,712 and the emergency gates, completed in 1923, $174.698.31.


   The length of section included in this project is about 8 miles.
The extreme tidal range is 19 feet. The range between mean lower
low water and mean higher high water is 11.3 feet, and between
mean lower low water and extreme low water is 4 feet. The ordi-
nary fluctuation in the upper pool is approximately 6 inches and
the extreme fluctuation is 2 feet.
   The estimate of cost of new work, revised in 1926, was $3,375,000,
exclusive of amounts expended on previous projects. The cost of
maintenance is defrayed from the permanent indefinite appropria-
tion for operating and care of canals and other works of navigation.
   The existing project was adopted by the following river and har-
bor acts: The act of June 25, 1910, as modified by the act of March 4,
1913, provided for a double lock and fixed dam with movable crest
and necessary accessory works at the entrance to Salmon Bay, the
dredging of a channel from the locks to deep water in Puget Sound,
and excavation by local interests of a channel from the locks into
Lake Washington (H. Doc. No. 953, 60th Cong., 1st sess.) ; the act
of August 8, 1917, provided, for dredging below the locks and revet-
ting canal banks (H. Doc. No. 800, 64th Cong., 1st sess.); and the
act of September 22, 1922, provided for increased dimensions of the
changnel between Puget Sound and the locks and a 600-foot extension
of the lower guide pier (H. Dec. No. 324, 67th Cong., 2d sess.). The
1380   REPORT   OF CHIEF OF    ENGINEERS,    U.   S. ARMY,   1934


latest published map is in House Document No. 140, Seventy-second
Congress, first session.
   Supplementing the work authorized by Congress, the modification
of the existing project so as to provide a channel 30 feet deep with a
width of 100 feet from the locks to Lake Union, 200 feet thence to
Portage Cut, 100 feet through Portage Cut, and thence 200 feet wide
through Union Bay to Lake Washington, as recommended by the
Chief of Engineers in House Document No. 140, Seventy-second
Congress, first session, was included in the Public Works program
under the National Industrial Recovery Act.
   Recommended modifications of project. Included in Public Works
program.
   Local cooperation.-Fully complied with.
   Terminal facilities.-In Salmon Bay, 1 wharf is Government
owned and 3 are municipally owned; 2 of the latter are open to public
use. Of 11 privately owned wharves, 1 only is open to public use.
   Lake Union has 2 sawmill and 24 other private wharves. Four
wharves are open to public use, 3 of which are publicly owned.
   Lake Washington has 4 wharves owned by the county which are
open to public use and 4 private wharves.
   These facilities are considered adequate for existing commerce.
 (For further details see Port Series No. 7, pt. 1, Corps of Engineers.)
   Operations and results during fiscal year.-No operations were
conducted with regular funds.
   Under authority of the Federal Emergency Administrator of Pub-
lic Works, dredging of the 30-foot channel between the locks and
Lake Washington was commenced under contract October 21, 1933.
A total of 668,224 cubic yards of material was dredged and 18.45
cubic yards of rock was removed, completing about 90 percent of this
work. The cost was $167,678.17 and the expenditure $156,508.09,
all for new work.
   Condition at end of fiscal year.-The existing project as adopted
by Congress was completed in 1932 at a cost and expenditure of
$3,346,778.43 for new work and $110,201.86 for maintenance, a total
of $3,456,980.29. In addition, there was expended by the State of
Washington $246,567.07, and by King County $742,070.51 in the
excavation of the channel above the locks and in the construction of
concrete revetment at the portage.
   The water from the locks into Lake Washington is nontidal and
is maintained at mean elevation of 21 feet above mean lower low
tide of Puget Sound, with a maximum variation of 2 feet. The
controlling depths at the end of the fiscal year were as follows:
Puget Sound to the locks, 33 feet at mean lower low water; locks
to Lake Union, 30 feet, and Lake Union to Lake Washington 25
feet, at normal pool level.
   The costs and expenditures from Public Works funds for the
dredging in progress on the 30-foot channel have been $167,678.17
and $156,508.09, respectively, all for new work.
   Proposed operations.-The unexpended balance of funds allotted
from the National Industrial Recovery Act will be applied to new
work, enlarging the channel between the locks and Lake Washington,
as follows:
                RIVERS AND HARBORS-SEATTLE,                                       WASH., DISTRICT                            1381
Accounts payable June 30, 1934____--------------------              $11, 170.08
Completing dredging of 30-foot channel under contract, July-October
  1934    ------------------------------------------------------ 28, 712. 71

           Total---------------------------------------------------39',                                                     882. 79
  This work will complete the project and, as it will be maintained
by allotment from the permanent indefinite appropriation for oper-
ating and care of canals, etc., no additional funds will be required.
                                           Cost     and    financial     summary
                                 MANTENANCE AND IMPROVEMENT' FUNDS

Cost of new work to June 30, 1934--------------------------                                                     $3, 831, 780. 88
Cost of maintenance to June 30, 1934_____- ____------------                                                         110, 201, 86
      Total cost of permanent work to June 30, 1934----------                                                       3, 941, 982. 74
Net total expenditures______________________    ___                                                                 3,941, 982. 74

           Total amount appropriated to June 30, 1934_------------                                                  3,941,982. 74

           Fiscal year ending June 30                       1930          1931             1932               1933           1934

Cost of new work------------                              $9, 057. 68   $6, 687. 54    $23, 703. 83      -------------------
Cost of maintenance. -------------------                  17, 748. 33   11, 707. 82 .----------------------------

       Total cost....--                                   26, 806. 01
                                       ....-------------------          18, 395. 36      23, 703. 83 ..------------------------
Total expended .-....
               -                .-..-..----.----          28, 270. 63   16. 389. 23      22, 251. 13           $53. 34
Allotted       ---------------------------........        39, 172.43    21,000.00      -7, 742.00       -1,480.01----------


                                                   PUBLIC WORKS FUNDS
Cost of new work to June 30, 1934     ______---------------                                                          $167, 678. 17
Cost of maintenance to June 30, 1934----------------------------

     Total cost of permanent work to June 30, 1934------------                                                        167, 678. 17
Minus accounts payable June 30, 1934___-- _----------                                                                  11, 170. 08
     Net total expenditures _  __________   _____    _---_   156, 508. 09
Unexpended balance June 30, 1934 -_____________------------39,    882. 79

           Total amount appropriated to June 30, 1934__                                                                96, 390. 88
                                                                                                                      1________-__

           Fiscal year ending June 30                       1930          1931             1932               1933           1934


Cost ofnew work---      ----                 ----------------------------------------------- $167, 678. 17
Cost of maintenance----                 ----------- -------  ---      -------          --            ------
                                                                                             ------------
Total expended...--------------...............................----------------------..------------..-----------156, 508. 09
Allotted............------------------------..------------........                                     ------------        196, 390. 88


Amount allotted from National Industrial Recovery Act, approved
  June 16, 1933----------                                       $199, 390. 88
Deductions on account of revocation of allotment______ ___ ---     3,000. 00

      Net amount to be accounted for ------------------------                                                          196, 390. 88
Gross amount expended_______________________         $157, 135. 87
Less reimbursements collected                  -627.            78
                                                                                                                       156, 508, 09
     Balance unexpended June 30, 1934- -------- _                                                                        39, 882. 79
Amount covered by uncompleted contracts .....--   ______ -_                                                              39, 882. 79
1382         REPORT OF            CHIEF       OF ENGINEERS,                 U. S.      ARMY,         1934

CONSOLIDATED COST AND FINANCIAL SUMMARY FOR LAIKE WASHINGTON                                              SHIP CANAL,
                                  WASH.

Cost of new work to June 30, 1934________________-----------                                         $3, 999, 459. 015
Cost of maintenance to June 30, 1934_-------------------------                                           110, 201. 86

     Total cost of permanent work to June 30, 1934----------4, 109, 660. 91
Minus accounts payable June 30, 1934 -----__---------- ----     11, 170. 08

     Net total expenditures --    ---
                                -______----                 4, 098, 490. 83
Unexpended balance June 30, 1934---------------------------     39, 882. 79

         Total amount appropriated to June 30, 1934-------------4, 138, 373. 62


         Fiscal year ending June 30                   1930           1931           1932           1933            1934


Cost of new work--        ------------------        $9, 057. 68    $6, 687. 54 $23, 703. 83                    $167, 678. 17
Cost of maintenance-         .____.. ________..
                                        .       _   17, 748. 33    11, 707. 82 _____________.____-____----        --------
      Total cost__ _.    ____---------              26, 806. 01    18, 395. 36   23, 703. 83-    _-------.      167, 678. 17
Total expended__-- -__----..___. ...         _...... 28, 270. 63   16, 389. 23   22, 251. 13        $53. 34      156, 508. 09

Allotted------------------ ---------..              39, 172. 43    21, 000. 00   -7, 742. 00    -1, 480. 01      196, 390. 88



Amount allotted from National Industrial Recovery Act approved
  June 16, 1933_________________                            __$199, 390. 88
Deductions on account of revocation of allotment    _
                                                  _----------    3, 000. 00

      Net amount to be accounted for___-___-___------    ___                                                 196, 390. 88
Gross amount expended------------------------$157, 135.87
Less reimbursements collected-----------------------  627. 78
                                                                                                             156, 508. 09
     Balance unexpended June 30, 1934 ______-_______------                                                    39, 882. 79
Amount covered by uncompleted contracts---------------------                                                  39, 882. 79

10. OPERATING AND CARE OF LAKE WASHINGTON SHIP CANAL, WASH.

   The improvement for which report is made under this caption
forms part of the project for Lake Washington Ship Canal, Wash.
 (See pp. 1378 to 1382, where general information regarding the
improvement can be found.) The large lock has been operated and
maintained under the permanent indefinite appropriation since April
8, 1916, and the small lock and dam so operated since July 30, 1916.
   Operations and results during fiscal year.-The locks were operated
throughout the year and work continued in connection with mainte-
nance of gates, valves, machinery, buildings, and grounds, all work
being done by hired labor. The cost was $84,505.80, all for mainte-
nance. The expenditure was $88,510.99.
   Condition at end of fiscal year.-The project for the construction
of the Lake Washington Ship Canal was completed in 1932. For
details, see report on Lake Washington Ship Canal. The total
costs for operating and care have been $1,505,021.11. The total
expenditures from the permanent indefinite appropriation have
been $1,510,743.93.
   Proposed operations.--The locks, dam, and canal will be operated
and maintained under allotments from appropriations made avail-
able for such purposes.
                RIVERS AND HARBORS-SEATTLE,                              WASH., DISTRICT                       1383
                                         Cost and financial sunmary

Cost of maintenance to June 30, 1934___------------------          $1, 505, 021. 11
Value of plant, materials, etc., on hand June 30, 1934------------       1, 903.69

      Net total cost to June 30, 1934                                                                 506, 924. 80
                                                                                                   1------------------------,
Plus accounts receivable June 30, 1934_________                           ___----- -----                 7, 647.29

     Gross total costs to June 30, 1934---------------                                             1, 514, 572. 09
Minus accounts payable June 30, 1934___ ________--------3,                                                 828.16

     Net total expenditures------   ------------------------                                       1, 510, 743. 93
Unexpended balance June 30, 1934_______________-------------                                           33, 200. 77

           Total amount appropriated to June 30, 1934 ._________                                   1, 543, 944. 70


           Fiscal year ending June 30              1930           1931          1932           1933            1934


Cost of new work..-------------.9-
Cost of maintenance.------------------
                                                 --------
                                                $91, 857. 12
                                                                I--
                                                                ---------------
                                                               $88, 174. 89
                                                                                       - ----  ---
                                                                            $98, 096.77 $80, 315. 31
                                                                                                           ----------
                                                                                                             $84, 505. 80
              ----------------------
Total expended.__                                90, 316. 85    90, 022. 35   98, 977. 11    86, 075. 75      88, 510. 99
Allotted      ---------------------------- 80 000. 00           90 000. 00    97 500. 00     96, 806. 70     101, 028. 30


Balance unexpended July 1, 1933___________--__----------            $20, 683. 46
Amount allotted from permanent indefinite appropriation, section 6,
  River and Harbor Act, Mar. 3, 1909___--------------------         105,300. 00

      Amount to be accounted for_ -- ___--   -    --------------                                       125, 983. 46
Deductions on account of revocation of allotment--------                                                 4, 271. 70

      Net amount to be accounted for   ___                               __-------------
                                                                  121, 711. 76
Gross amount expended      --------------------------$89, 179. 09
Less reimbursements collected------------------------     668. 10
                                                                   88, 510. 99
      Balance unexpended June 30, 1934 ____ ----------                                                     33, 200. 77
Outstanding liabilities June 30, 1934 ---------------- $3, 828. 16
Amount covered by uncompleted contracts__ ----     __- 31, 353.49
                                                                                                           35, 181. 65

     Balance available June 30, 1934 ____________--------                                -             -- 1, 980. 88
Accounts receivable June 30, 1934_ __--___----- -      --                              -__              - 7, 647.29

     Unobligated balance available June 30, 1934-........---                                       .        5, 666. 41
Amount allotted for fiscal year 1935__--------- -------------                                              88, 500. 00

           Balance available for fiscal year 1935_----------                                               94, 166. 41

             11. EVERETT HARBOR AND SNOHOMISH. RIVER, WASH.

  Looation.-Everett Harbor is located on Port Gardner Bay, at
the northern end of Possession Sound, an arm of Puget Sound, 30
miles north of Seattle and 45 miles south of Bellingham. (See U. S.
Coast and Geodetic Survey Chart No. 6448.)
  Previouls projects.-Adopted by the River and Harbor Act of
August 18, 1894, and modified April 23, 1902 (joint resolution of
Congress), and River and Harbor Act of March 3, 1905. The cost
and expenditures on original and modified projects prior to the
adoption of the existing project in 1910 were $418,209.14 for new
work and $5,868.63 for maintenance, a total of $424,077.77. For
further details, see page 2005 of Annual Report for 1915.
1384   REPORT   OF CHIEF OF   ENGINEERS,   U.   S.   ARMY,   1934

   Existing project.-This provides for a training dike with gap of
such width as may prove advisable at the outlet of the Old River
Channel; for raising 6,000 feet of the existing dike or bulkhead in
Everett Harbor to an elevation of 14 feet above mean lower low
water; for extending the spur dike on the south side of the gap
eastwardly to the pierhead line; for maintaining to a depth of 30
feet, at mean lower low water, the channel designated as east water-
way in Everett Harbor, which is to be dredged to 30 feet by local
interests, to the east of the proposed municipal dike and fill; for
maintaining a channel approximately 100 feet wide between deep
water in Everett Harbor and the gap in the dike to a depth of not
exceeding 8 feet; the construction of closing dikes and mattress sills
across subsidiary sloughs of the main river.
   The length of improvement under this project is 2.5 miles. The
extreme tidal range is 18 feet. The range between mean lower low
water and mean higher high water is 11.3 feet. The estimate of cost
for new work, revised in 1930, was $368,400, exclusive of amounts
expended under previous projects. The latest (1930) approved esti-
mate of annual cost of maintenance of the east waterway and the
channel to the gap is $5,500. No estimate has been made for main-
taining the Old River Channel, nor for maintenance of dikes.
   The project was adopted by the River and Harbor Act of June
25, 1910 (H. Doc. No. 1108, 60th Cong., 2d sess.), and modified by the
River and Harbor Act of July 3, 1930 (H. Doc. No. 377, 71st Cong.,
2d sess.). The latest published maps are in House Document No.
649, Sixty-third Congress, second session, and House Document No.
377, Seventy-first Congress, second session.
   Recommended modifications of project.-The dredging of certain
shoals which interfere with the movement of navigation in Puget
Sound and its tributary waters is recommended in House Document
No. 307, Seventieth Congress, first session.
   Terminal facilities.-There are 19 piers and wharves at Everett,
10 being located on the deep-water harbor and the remainder on
Snohomish River. On the harbor, 2 terminals do an overseas busi-
ness and 1 serves local traffic, all three being open to the public on
equal terms. On Snohomish River there are 9 sawmill wharves.
These facilities are considered adequate for existing commerce. (For
further details see Port Series No. 7, pt. 3, Corps of Engineers.)
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1931. The controlling depth in the Old River Channel
is 1 foot at mean lower low water. The controlling depth through
the opening in the dike. and westward over the tide flats to the
sound is about 1 foot above mean lower low water. The channel
southward of the opening in the dike to Port Gardner Bay, which
was dredged to 8 feet in 1931, now has a controlling depth of 1.3
feet at mean lower low water, but a depth of 3.9 feet exists in a
crooked channel as far up as the Great Northern Railway bridge.
Dredging of the east waterway by local interests is practically
completed.
   The costs and expenditures have been $310,246.15 for new work
and $81,410.96 for maintenance, a total of $391,657.11.
                 RIVERS AND HARBORS-SEATTLE,                                 WASH., DISTRICT                      1385
  Proposed operations.-No funds are available, and no operations
are proposed during the fiscal year 1935.
  The sum of $15,000 can be profitably expended during the fiscal
year 1936 for maintenance dredging in Everett Harbor, by contract,
July-August 1935.
                                       Cost and financial summary

Cost of new work to June 30, 1934                                                                           $728, 455. 29
Cost of maintenance to June 30, 1934_:-                              _-_                                      87, 279. 59

      Total cost of permanent work to June 30, 1934                                                          815, 734. 88
Net total expenditures_                     __ __.                                                           815, 734. 88
Total amount appropriated to June 30, 1934______________________                                             815, 734. 88


    Fiscal year ending June 30              1930            1931                  1932         1933              1934


Cost of new work...            ...-----------
                                         --------------   $84, 809. 98       -$927. 50
Cost of maintenance                        $2, 079. 41      4, 876. 93       29, 193. 21      $1, 213. 41               -

       Total cost- .2,                        079. 41      89, 686. 91       28, 265. 71       1, 213. 41
Total expended -----------------
                      __                    2, 067. 47     61, 902. 95       55, 527. 68       1, 747. 34               -
Allotted-------------....--------------                   132, 000. 00     -14,     821. 24     -66. 72                 -




Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance _-__----  _         ___      --    ___ $15, 000.00

                                   12. BELLINGHAM HARBOR, WASH.

   Location.-This harbor is a part of Bellingham Bay, an arm of
Puget Sound, about 18 miles south of the international boundary
and about 100 miles north of Seattle. (See U. S. Coast and Geodetic
Survey Chart No. 6378.)
   Previous projects.-Adopted by the River and Harbor Act of June
13, 1902. The cost and expenditures on this project prior to the
adoption of the existing project in 1910 were $56,581.93 for new work
and $1,092.05 for maintenance, a total of $57,673.98. For further
details see page 2006 of Annual Report for 1915.
   Existing project.-This provides for (a) dredging a channel
known as the Whatcom Creek waterway from deep water to the head
of the harbor, 363.2 feet wide, 26 feet deep at mean lower low water
for the outer 3,800 feet and 18 feet deep for the inner 1,300 feet; and
 (b) for an entrance channel in Squalicum Creek waterway, 200 feet
wide, 26 feet deep, from deep water in the bay to the main pierhead
line. The extreme tidal range is 16.5 feet. The range between mean
lower low water and mean higher high water is 8.5 feet.
   The estimate of cost for new work revised in 1913, was $81,782
for Whatcom Creek waterway and $25,000 (made in-1927) for Squal-
icum Creek waterway, exclusive of amount expended on previous
project. The latest (1928) approved estimate for annual cost of
maintenance is $2,000 for Whatcom Creek waterway and $500 after
the first 2 years for Squalicum Creek waterway.
   The project was adopted by the following river and harbor acts:
The act of June 25, 1910, provided for Whatcom Creek waterway
 (H. Doc. No. 1161, 60th Cong., 2d sess.); and the act of July 3, 1930,
provided for Squalicum Creek waterway. (H. Doc. No. 187, 70th
1386       REPORT        OF        CHIEF          OF ENGINEERS,                     U.   S.     ARMY,      1934


Cong., 1st sess.). The latest published map of Whatcom Creek
waterway is in the former document, and of Squalicum Creek water-
way in the latter.
  Local cooperation.-Fully complied with.
  Terminal facilities.-There are 21 piers and wharves at Belling-
ham Harbor, 7 of which are on Whatcom Creek waterway, 3 on
Squalicum Creek waterway, and 11 on the bay, 10 being south of
the waterways and 1 north of them. Two of those on Whatcom
Creek waterway are publicly owned and open to general public use.
The port commission wharf on Squalicum Creek waterway is open
to public use and serves fishing boats mainly. These facilities are
considered adeqate for existing commerce. (For further details see
Port Series No. 7, pt. 3, Corps of Engineers.)
  Operations and results during fiscal year.-A survey of Squalicum
Creek waterway was made in October 1933. There were no other
operations, and no costs or expenditures.
  Condition at end of fiscal year.-The existing project was com-
pleted in 1931. The dredging of the entrance channel in Squalicum
Creek waterway was completed in 1931. The dredging of What-
com Creek waterway was completed in 1913. The controlling depths
at mean lower low water when last ascertained were as follows:
Whatcom Creek waterway, 26 feet for the outer 2,900 feet over the
full width, 24 feet over a width of 220 feet for the next 600 feet,
20 feet over a width of 240 feet for the next 300 feet (August 1932) ;
17 feet for the inner 1,300 feet (May 1933); Squalicum Creek water-
way, 26 feet (October 1933).
  The costs and expenditures have been $112,013.16 for new work
and $31,099.31 for maintenance, a total of $143,112.47.
  Proposed operations.-The funds unexpended June 30, 1934,
$20,000, will be applied to maintenance dredging in Whatoom Creek
waterway, by contract, October-November 1934.
  No additional funds can be profitably expended during the fiscal
year 1936.
                                        Cost and financial summary
Cost of new work to June 30, 1934----------------------------                                                   $168, 595. 09
Cost of maintenance to June 30, 194----------------------------                                                   32, 191. 36
        Total cost of permanent work to June 30, 1934------------                                                200, 786. 45

Net total expenditures_       --------------------------------                                                  200, 786. 45
Unexpended balance June 30, 1934___                                                                              20, 000. 00
        Total amount appropriated to June 30, 1934---------------                                               220. 786. 45

        Fiscal year ending June 30                         1930              1931             1932       1933             1934


Cost of new work                             ________30,                  $. 231. 02
Cost of maintenance _                               ------          ---     9, 929. 97 .2,      -    $-103. 30      -      --    _-


      Total cost----------        ---------------      ..--------          40, 160. 99               2, 103. 30
Total expended ......   .. ....        .............           .          40, 160. 99                2, 103. 30
Allotted____________         -------       ----        $12, 000. 00       28, 484.00                    1, 780.29       $20,000.00
         RIVERS AND HIARBORS-SEATTLE,         WASH.,   DISTRICT       1387
Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934----     -------------------------------------   $20,000. 0

Balance unexpended June 30, 1934     _______-___--                20, 000. 00

                 13. WRANGELL NARROWS,         ALASKA

   Location.-Wrangell Narrows lies to the west of Mitkof Island,
connects Sumner Strait with Frederick Sound, and forms a part of
the inside water route from Puget Sound to southeastern Alaska.
The locality is shown on Coast and Geodetic Survey Charts Nos.
8170 and 8200.
   Existing project.-This provides for a channel 200 feet wide on
the bottom and 21 feet deep at mean lower low water, with increased
depth in rock, and 27 feet deep at Shoal No. 2.
   The estimate of cost for the entire project outlined in House Docu-
ment No. 179, Sixty-seventh Congress, second session, was $2,000,000
for new work and $10,000 annually for maintenance. This estimate
was made in 1921. Congress adopted this project subject to the
condition that " no greater sum than $500,000 shall be expended on
this project until specifically authorized by law." The estimated
annual cost of maintenance of the partial project so authorized is
$5,000.
   The existing project was authorized by the River and Harbor Act
approved March 3, 1925 (H. Doc. No. 179, 67th Cong., 2d sess.).
The latest published maps are in the project document, and House
Document No. 647, Seventy-first Congress, third session.
   Supplementing the work authorized by Congress, the modification
of the existing project so as to provide for a channel 24 feet deep
and 275 feet wide at Shoal No. 1, the easing of curves at Shoals Nos.
5, 6,7, and 12; the removal of a rock pinnacle opposite Anchor Point,
and 5 small rock pinnacles in the towing channel, as recommended
by the Chief of Engineers in House Document No. 647, Seventy-first
Congress, third session, was included in the Public Works program
under the National Industrial Recovery Act.
   Recommnended modifications of project.-Included in Public
Works program.
   Terminal facilities.-The terminal facilities at Petersburg, the
only port in the Narrows, consist of 1 cannery wharf, 2 oil wharves,
and also 2 general wharves, which are privately owned but open to
the public. These facilities are considered adequate for existing
commerce.
   Operations and results during fiscal year.-Maintenance dredg-
ing under regular appropriations by the U. S. dredge Col. P. S.
Michie was continued from July 1 to September 2, 1933, a total of
319,362 cubic yards being removed, at a cost of $44,659.64. The ex-
penditures were $53,277.21.
   Under authority of the Federal Emergency Administration of
Public Works dredging and rock removal was commenced under
contract December 13, 1933, and was 50 percent completed at the
end of the fiscal year, a total of 5,527 cubic yards of rock having
been drilled and blasted, 3,481 cubic yards of rock removed, and
1,469 cubic yards of material dredged. The costs were $74,079.50,
and the expenditures $43,543.07, all from Public Works funds for
new work.
1388       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                             1934

   Condition at end of fiscal year.-The limited project as author-
ized by Congress was completed in 1928. The controlling depth on
June 30, 1934, was 20 feet at mean lower low water. The costs and
expenditures from regular appropriations have been $452,970.93 for
new work and $177,679.97 for maintenance, a total of $630,650.90.
   The status of work authorized by the Public Works Administra-
tion is as stated in paragraph Operations and results during fiscal
year.
   Proposed operations.-The unexpended balance of allotment from
the National Industrial Recovery Act will be applied to completing
the new work pertaining to modification of project included in the
Public Works program as follows:
Accounts payable June 30, 1934__                                   $33, 643. 20
,Completion of contract for dredging and rock removal, July-August
  1934     -------------------------------------------------        61, 813. 73
J3alance available for reallotment---------------------_             6, 000. 00
        Total              -----------------------------------------                                  101, 456. 93
  No funds can be profitably expended during the fiscal year 1936
as no work is contemplated.
                                  Cost and financial summary
                           MAINTENANCE AND IMPROVEMENT                         FUNDS

Cost of new work to June 30, 1934__________-------------------                                       $452, 970. 93
Cost of maintenance to June 30, 1934 __----------          -____--                              __    177, 679. 97

      Total cost of permanent work to June 30, 1934 ____________  30, 650. 90
Net total expenditures--- ----------------------------------     630, 650. 90
Total amount appropriated to June 30, 1934-------------------630,     650. 90


        Fiscal year ending June 30                   1930           1931         1932         1933            1934

Cost of new work------               -------------------------------------------------------
                                                          $747. 77 $44, 000. 00 $9, 243. 49 $44, 659. 64
Cost of maintenance_----- -----     __.    . I$44, 232.82
Total expended----------_--------               43, 484. 07          800. 73   44, 000.00      625. 92       53, 277.21
Allotted--__-_-_-----
                .........-                      __           -36,
                                                            ..       747. 77    8,000.00    62, 977. 50    ...........


Balance unexpended July 1, 1933_--_----------------------                                             $62,351.58
Deductions on account of revocation of allotment --------------                                         9, 074.37

      Net amount to be accounted for ------------------------                                             53, 277. 21
Gross amount expended__--__--------     -------------                                                     53,277. 21
                                          PUBLIC      WORKS         FUNDS


Cost of new work to June 30, 1934    ___--------------$74,                                                   079.50
Cost of maintenance to June 30, 1934______

      Total cost of permanent work to June 30, 1934-__________                                            74, 079. 50
Value of plant, materials, etc., on hand June 30, 1934__--- -____--3,                                         106. 77

     Net total cost to June 30, 1934____________---   _________                                           77, 186. 27
Minus accounts payable June 30, 1934 ____________------___                                                33, 643. 20
     Net total expenditures---_  ---                                           ---                     43, 543. 07
Unexpended balance June 30, 1934--                                                                    101, 456.93
        Total amount appropriated to June 30, 1934-                                                   145,000.00
               RIVERS AND HARBORS-SEATTLE,                                                    WASH., DISTRICT                            1389

         Fiscal year ending June 30                               1930                 1931               1932             1933          1934

Cost of new work.______                              _
                                              --------------------------
                                                             _                                                                         $74, 079. 50
Cost of maintenance                        ---                                                    ...         ...--
Total expended.------...           ----            ------------------------------------------------                                     43, 543.07

Allotted .        ------------------------------------------------------------------                                                   145, 000. 00



Amount allotted from National Industrial Recovery Act approved
  June 16, 1933----------------------------------------                   $145, 000. 00
Gross amount expended_ ... __---- -               -     -----------------   43, 543.07
     Balance unexpended June 30, 1934__-------  --------                                                                           101, 456. 93
Amount covered by uncompleted contracts____--------      --                                                                        101, 095.22

          Balance          available June 30, 1934------------------------                                                              361. 71

  CONSOLIDATED COST AND FINANCIAL SUMMARY FOR WRANGELL NARROWS, ALASKA

Cost of new work to June 30, 1934                                                                                                  $527, 050. 43
Cost of maintenance to June 30, 1934 _____                                                    _____________                         177, 679. 97
      Total cost of permanent work to June 30, 1934_..........                                                                      704, 730. 40
Value of plant, materials, etc., on hand June 30, 1934_ ....- --                                                                      3, 106. 77

      Net total cost to June 30, 1934_--------------------                                                                          707, 837. 17
Minus accounts payable June 30, 1934_.------------------                                                                             33, 643.20
     Net total expenditures---    --------------------------                                                                        674, 193. 97
Unexpended balance June 30, 1934_ .....      __....---                                                                              101, 456. 93
          Total amount appropriated to June 30, 1934 _---.--__--                                                                    775, 650. 90

          Fiscal year ending June 30                               1930                1931               1932             1933           1934


Cost of new work ...-----------                     ------------------------------------------------                                   $74, 079.50
Cost of maintenance--..--..-.---..            ----...         $44, 232. 82             $747. 77       $44, 000. 00       $9, 243. 49    44, 659. 64
       Total cost......----------------------                  44, 232. 82              747. 77         44, 000. 00       9, 243. 49   118, 739. 14
Total expended........----------------------43, 484. 07                                 800. 73         44, 000. 00         625. 92     96, 820. 28
Allotted..-------------------------------------...                                36, 747. 77            8, 000. 00      62, 977. 50   145, 000. 00


Balance unexpended July 1, 1933______________-___     ________ $62, 351. 58
Amount allotted from National Industrial Recovery Act approved
  June 16, 1933------------------------------------------145, 000. 00

      Amount to be accounted for      __ __--- -------         207, 351. 58
Deductions on account of revocation of allotment----------------9, 074. 37

      Net amount to be accounted for___________-----------                                                                          198, 277. 21
Gross amount expended_             ---------- ___-___   ___
                                                         -                                                                           96, 820. 28
     Balance unexpended June 30, 1934_____-__-        -       101, 456. 93
                                                          -______
Amount covered by uncompleted contracts____________________ 101, 095. 22

          Balance available June 30, 1934_________ ___ -                                                              -___ -___-         361. 71

                        14. HARBOR OF REFUGE, SEWARD, ALASKA

   Location.-This harbor is located at Seward, Alaska, on the west
side of the north end of Resurrection Bay. The harbor is about 130
1390        REPORT OF CHIEF OF ENGINEERS,                                   U.    S.       ARMY,           1934

miles west of Cordova, Alaska. The locality is shown on Coast and
Geodetic Survey Chart No. 8529.
  Existing project. This provides for the construction of a break-
water 580 feet long and the dredging of an area of about 207,000
square feet to a depth of 12.5 feet at mean lower low water.
  The estimate of cost for new work made in 1927 was $85,000.
  The existing project was adopted by the River and Harbor Act
approved July 3, 1930 (H. Doc. 109, 70th Cong., 1st sess.). The
latest published map is in the project document.
   Terminal          facilities.-Docking
                                   facilities at Seward include one
commercial wharf, owned by the Alaska Railroad, which is avail-
able to the use of the public on payment of the usual wharfage
charges, one wharf owned by the Standard Oil Co., and one owned
by the San Juan Cannery. These facilities are considered adequate
for existing commerce.
   Operations and results during fiscal year.-A total of 2,020.94
cubic yards of armor rock was placed on the breakwater by the
Alaska Railroad. The costs and expenditures were $9,198.31, all
for maintenance.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1931. The controlling depth is 12 feet at mean lower
low water. The total costs and expenditures have been $103,202.61
for new work and $9,198.31 for maintenance, a total of $112,400.92.
  Proposed operations.-No funds are available, and no operations
are proposed during the fiscal years 1935 and 1936.
                                     Cost and financial summary

Cost of new work -to June 30, 1934______________________________                                               $10, 202. 61
Cost of maintenance to June 30, 1934________________________                                                      9, 198. 31
      Total cost of permanent work to June 30, 1934 ________112, 400. 92
Net total expenditures---     ---------------------------- 112, 400. 92
Total amount appropriated to June 30, 1934 _________________  112, 400'. 92

   Fiscal year ending June 30             1930             1931               1932                  1933             1934


Cost of new work ______________-------------             $40, 172. 80       $63, 302. 81           -$273. 00
Cost of maintenance ..   ..   ..      ...--      -----       ... . _ ..--   ...      ...     ...    --.. ...        $9, 198. 31

      Total cost__        - --                            40, 172. 80        63, 302. 81            -273. 00          9, 198. 31
Total expended__                                          39, 852. 85        63, 622. 76            -273. 00          9, 198. 31

Allotted_                                                107, 000. 00       -3, 524. 39             -273. 00       -10, 801. 69



Balance unexpended July 1, 1933______________________________ $20, 000. 00
Deductions on account of revocation of allotment ___-___- ___-__ 10, 801. 69

         Net amount to be accounted for ______                              ___________--_ -                      9', 198. 31
Gross amount expended_ _______------------                   _                              -----                 9', 198.31


                                 15. NOME HARBOR, ALASKA

  Location.--Nome Harbor is in the portion of Norton Sound in
front of the city of Nome, Alaska, at the mouth of Snake River. It is
a shallow, open roadstead about 115 miles north of the Apoon mouth
           RIVERS AND HARBORS    SEATTLE,   WASH.,   DISTRICT    1391

of the Yukon River and 125 miles northwest of St. Michael Harbor.
 (See U. S. Coast and Geodetic Survey Chart No. 9380.)
   Existing project.-This provides for two parallel timber and con-
crete jetties, each 400 feet long, at the mouth of Snake River, and a
channel 8 feet deep at mean lower low water from Norton Sound,.
through Snake River, to the mouth of Bourbon and Dry Creeks, in
the city of Nome, ending in a basin of similar depth 200 feet wide and
250 feet long and revetting the banks of the river. The length of
the section included in the project is 1,500 feet. The extreme tidal
range is 2.8 feet. The range between mean lower low water and
mean higher high water is 1.4 feet. The water levels are influenced
more by wind than tide, an offshore wind sometimes causing a level
of from 2 to 3 feet below mean lower low water for days at a time
and a level of 14 feet above mean lower low water having been notec
as a result of storms. The estimate of cost for new work, revised in
1921, was $273,000. The latest (1928) approved estimate for annual
cost of maintenance is $25,000, of which $2,500 is to be contributed
by the city of Nome. The project was adopted by the River and
Harbor Act of August 8, 1917. (H. Doc. No. 1932, 64th Cong., 2d
sess.) The latest published maps are in the above-mentioned docu-
ment, and House Document No. 404, Seventy-first Congress, second
session.
   Recommended 'modifications of project.-Under date of May 19,
1930, the Chief of Engineers recommended modification of the exist-
ing project so as to provide for dredging the entrance channel and
turning basin to a depth of 8 feet; for extending the east jetty
approximately 616 feet; and for such extension of the west jetty,
not more than 216 feet, as may be found to be necessary, at an esti-
mated cost of $253,000, with $20,000 annually for maintenance; sub-
ject to such modification in location and design as may be found to
be advisable (H. Doc. No. 404, 71st Cong., 2d sess.).
   Under date of April 13, 1934, the Chief of Engineers recommended
further modification of the existing project so as to provide for an
extension to the present turning basin 250 feet wide, 400 feet long,
and 8 feet deep, at an estimated cost of $16,500, with no increase
in the present estimated cost of annual maintenance (Rivers and
Harbors Committee Doc. No. 38, 73d Cong., 2d Sess.).
   Local cooperation.-Fully complied with.
   Terminal facilities.-Cargoes and passengers from ocean vessels
are lightered to and from shore, a distance of about 2 miles. There°
is one privately owned wharf outside the improvement area, which is:
open to the general public. Traffic using the dredged channel and
basin is handled over the revetment, where transfer facilities have
been installed by the city and lighterage companies. These facili-
ties are considered adequate for existing commerce.
   Operations and results duringfiscal year.-Seasonal repairs to jet-
ties and revetment were made and 7,602 cubic yards dredged, by
Government plant and hired labor. The costs were $29,611.92 from
Federal funds and $2,500 from contributed funds, a total of $32,111.92,
all for maintenance. The expenditures were $35,761.98 from Federal
funds and $2,500 from contributed funds.
      91536-ENG 1934--88
1392         REPORT OF CHIEF OF ENGINEERS, U. S. ARIVIY, 1934

  Condition at end of fiscal year.-The project was completed in 1923.
The controlling depths when last ascertained were as follows: Chan-
nel, 7 feet (June 1934) ; bar and basin, 6.5 feet (October 1933).
  The costs of the existing project have been $272,950.13 for new
work and $238,631.71 for maintenance, a total of $511,581.84, from
Federal funds, and $30,000 for maintenance from contributed funds.
The total expenditures have been $540,608.02 from Federal funds and
$30,000 from contributed funds.
  Proposed operations.-The funds unexpended June 30, 1934,
$29,796.63 (including $2,500 contributed by the city of Nome) will be
applied to maintenance, as follows:
Accounts payable June 30, 1934_______-----------------------$2, 925. 21
Repairs to jetties and revetment, by hired labor, July-October 1934
  and April-June 1935-------------------------------------           3, 500. 00
Dredging, by hired labor and Government plant, 25,000 cubic yards,
  July-October 1934 and April-June 1935----------------------       22, 771. 42
Ice removal, by hired labor, April-May 1935-----------------------       00. 00

         Total----------------                                                                                        796. 63
                                                                                                                  2-------------------,
  The additional sum of $25,000 (including $2,500 to be contributed)
can be profitably expended during the fiscal year 1936, for mainte-
nance, as follows:
Repairs to jetties, by hired labor, July-October 1935------ --                                                    $3, 000. 00
Repairs to revetment, by hired labor, July-October 193 ---------                                                   3, 000. 00
Dredging, by hired labor, July-October 1935 and May-June 1936 ...                                                 18, 400. 00
Ice removal, by hired labor, April-May 1936 -------  ---------                                                        600. 00

         Total_                            __------------                                                         25, 000. 00
                                         Cost and financia summary
                                                 UNITED STATES FUNDS

                                          --
Cost of new work to June 30, 1934_________..-_____       -                                                   $272, 950. 13
Cost of maintenance to June 30, 1934 ________ _____-----                                                      238, 631. 71
      Total cost of permanent work to June 30, 1934 __________   511, 581. 84
Value of plant, materials, etc., on hand June 30, 1934-----------31, 951. 39
      Net total cost to June 30, 1934____-__________________                                                  543, 533. 23
Minus accounts payable June 30, 1934 ..-------------------------                                                2, 925.21
     Net total expenditures __________-----___-_______                                                        540, 608. 02
Unexpended balance June 30, 1934___________                                                                    27, 296. 63
      Total amount appropriated to June 30, 1934__-----___________                                            567, 904. 65

          Fiscal year ending June 30                     1930           1931           1932           1933             1934


Cost of new work.---------.------------------------
Cost of maintenance-           _ _------------    -   $25, 216. 73   $21,437. 88    $22, 868. 10   $20, 069. 19     $29, 611.92
Total expended --------------------------              31, 004.90     22, 888.85     23, 107. 56    38, 545. 43       35, 761. 98
Allotted----         ------------------------          31, 300. 00    19, 400. 00     4, 000. 00    75, 735. 32       21, 019. 20


Balance unexpended July 1. 1933                           ____ $42,039. 41
Amount allotted from War Department Appropriation Act approved
   Apr. 26, 1934________________,22,                                                                                  000. 00
     Amounted to be accounted for_-        _         --
                                                 ______--- _                                                      64, 039. 41
Deductions on account of revocation of allotment ______--_                                                            980. 80
          Net amount to be accounted for_                                                            _
                                                                                                   -______        63, 058. 61
              RIVERS AND HARBORS-SEATTLE,                              WASH.,        DISTRICT             1393
Gross amount expended____________________________                                $38, 361. 98
Less reimbursements collected ----------------------                               2, 600. 00
                                                                                                  $35, 761. 98
      Balance unexpended June 30, 1934_______________ ____ _                                          27, 296. 63
Outstanding liabilities June 30, 1934 _________________ $2, 925. 21
Amount covered by uncompleted contracts --------------       10. 92
                                                                                                       2, 936. 13

         Balance available June 30, 1934____________________                               __         24, 360. 50

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1------------------------_          ___                                    22, 500. 00
                                             CONTRIBUTED FUNDS

Cost of new work to June 30, 1934
Cost of maintenance to June 30, 1934 __________________--__                                     _ $30, 000. 00

         Total cost of permanent work to June 30, 1934______________                                  30, 000.00

Net total expenditures_________________ __________________--30, 000. 00
Unexpended balance June 30, 1934--------------- ------------- 2, 500. 00

         Total amount contributed to June 30, 1934_______                                __           32, 500. 00

         Fiscal year ending June 30               1930          1931          1932         1933           1934


Cost of new work ..-----                                                          ---------             --------
Cost of maintenance .-------------------        $2, 500. 00   $2, 500. 00   $2, 500. 00 $2, 500. 00      $2, 500. 00
Total expended-------      ..-----------..       2,500. 00     2,500. 00     2,500. 00    2,500. 00       2,500. 00
Contributed.---------------------------          2,500. 00     2,500. 00     2,500. 00    2,500. 00       5,000. 00


Contributed by city of Nome, July 8, 1933---------------------    $2, 500. 00
Contributed by city of Nome, June 21, 1934___ __ -   -    -_______-2, 500. 00

      Amount to be accounted for___-  __-------------_____                                             5, 000. 00
Gross amount expended ___-----__.-----------------                                                     2, 500. 00

      Balance unexpended June 30, 1934____-.......                                                    2, 500. 00
Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1-_________________                                                         2, 500. 00

        CONSOLIDATED COST AND FINANCIAL SUMMARY FOR NOME HARBOR, ALASKA

Cost of new work to June 30, 1934 --__-    -                      -_________--    __ $272, 950. 13
Cost of maintenance to June 30, 1934_ __..                        ___  __-___--__ _ 268, 631. 71

      Total cost of permanent work to June 30, 1934__---- ______                                  541, 581. 84
Value of plant, materials, etc., on hand June 30, 1934_ __--__--__                                 31, 951. 39

      Net total cost to June 30, 1934--------------------__                                       573, 533. 23
Minus accounts payable June 30, 1934_---_____     -___-     ___                                     2, 925. 21
     Net total expenditures___----- -____---                                  ______      _       570, 608. 02
Unexpended balance June 30, 1934                                                                   29, 796. 63
         Total amount appropriated and contributed to June 30, 1934_                              600, 404. 65
  1   Exclusive of available funds.
 1394       REPORT          OF CHIEF OF ENGINEERS, IT. S. ARVMY~                             1934


         Fiscal year ending June 30              1930          1931          1932          1933             1934

Cost of new work---------      -------------------------------------------------- --------                --------
Cost of maintenance-----------------------    $27, 716. 73 $23, 937. 88 $25,368. 10 $22, 569.19          $32, 111. 92
Total expended -------------------------       33, 504. 90   25, 388. 85   25, 607.56    41, 045.43       38, 261. 98
Allotted and contributed     ------   ----    33, 800. 00   21, 900. 00    6, 500. 00   78, 235.32       26, 019. 20


Balance unexpended July 1, 1933------------------------------                                     $42, 039. 41
Contributed by city of Nome, July 8, 1933_______________ $2, 500. 00
Contributed by city of Nome, June 21, 1934_________       2,500. 00
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934__                ---------  22,000. 00
                                                                                                      27, 000. 00

      Amount to be accounted for------------------------------69, 039. 41
Deductions on account of revocation of allotment----------------- 980. 80

      Net amount to be accounted for___                                                                   058. 61
                                                                                                      6----------------------------
Gross amount expended___________________--                                       $40, 861. 98
Less reimbursements collected-------------______                                    2, 600. 00
                                                                                                      38, 261. 98

      Balance unexpended June 30, 1934________________________                                        29, 796. 63
Outstanding liabilities June 30, 1934               - $2, 925. 21
Amount covered by uncompleted contracts ________10.            92
                                                                                                       2, 936. 13

        Balance available June 30, 1934----------------------------                                   26, 860. 50

Amount that can be profitably expended1 in    fiscal year
                                         - -- - - - - - - - -
ending June 30, 1936, for maintenance ___ __ ___ _                                                   25, 000. 00

                16. LOWELL CREEK, ALASKA, FLOOD CONTROL

    Location.-Lowell Creek is a torrential, glacier-fed stream about
41/2 miles long, which rises in the mountains west of Seward, Alaska,
and flows eastward into Resurrection Bay, an arm of the Gulf of
Alaska, through the city of Seward. (See U. S. Coast and Geodetic
Survey Chart No. 8529.)
    Existing project.-Public Resolution No. 52, Sixty-ninth Congress,
approved February 9, 1927, authorized the Secretary of War to
expend not to exceed $125,000 for the protection of property at
Seward from damage due to floods and overflows of Lowell Creek,
and the work contemplated by this resolution was assigned by the
Secretary of War to the Alaska Road Commission. The regulation
of Lowell Creek was accomplished by the construction of an intake
dam 8 feet high and 330 feet long across the mouth of Lowell Creek
canyon and a timber flume of rectangular section, 12 feet wide, 7
feet deep, and 3,300 feet long, extending from the dam, through the
city of Seward, to Resurrection Bay, where the debris-laden flood
flow was dumped in deep water. When the Alaska Road Commis-
sion was transferred to the Department of the Interior (act ap-
proved June 30, 1932, Public, No. 218, 72d Cong.) the project was
assigned to the Chief of Engineers. The latest estimated cost of
new work, contained in an unpublished report submitted by the
president Alaska Road Commission to the Secretary of the In-
  SExclusive of available funds.
                   RIVERS AND HARBORS-SEATTLE,                                                            WASH.,           DISTRICT             1395

terior, through the.Secretary of War, on January 19, 1925, was
$120,000. The act approved February 14, 1933 (Public No. 336, 72d
Cong.) authorizes the Secretary of War to submit estimates for the
proper maintenance of the flood-control works. No approved esti-
mate for annual maintenance has been made.
   Local cooperation.-In accordance with the Act of Congress ap-
proved February 9, 1927, the city of Seward and the Territory of
Alaska jointly contributed, the sum of $25,000 toward the cost of
construction.
   Terminal facilities.-None.
   Operations and results during fiscal year.-Repairs were made to
the flume and intake works, by hired labor, at a cost of $8,781.25,
all for maintenance. The expenditure was $9,593.22.
   Condition at end of fiscal year.--The project was completed by the
Alaska Road Commission in 1929 at a cost of $113,157.87, of which
$25,000 was contributed jointly by the city of Seward and Territory
of Alaska. The costs have been $88,157.87 for new work and $21,-
541.89 for maintenance, a total of $109,699.76 from United States
funds, and $25,000 from contributed funds. The total expenditures
have been $109,486.01 from United States funds and $25,000 from
contributed funds.
   Proposed operations.-No operations are contemplated during the
fiscal year 1935. No funds are available, the balance of the 1933-34
funds ($10,956.51) having lapsed on June 30, 1934.
   The sum of $2,000 can be profitably expended during the fiscal
year 1936, for maintenance, repairs to flume structure, by hired
labor, as required.
                                                          Cost and financial summary
Cost of new work to June 30, 1934                         .                                                                           $88, 157. 87
Cost of maintenance to June 30, 1934---------------------------                                                                        21, 541. 89

      Total cost of permanent work to June 30, 1934-   __                                                                             109, 699. 76
Minus accounts payable Jule 30, 1934---------------------------                                                                            213. 75

      Net total expenditures-------------------------------                                                                            109, 486. 01
Unexpended balance June 30, 1934 _..                                                                                                    11, 171. 81

           Total amount appropriated to June 30, 1934                                                                                   20, 657. 82
                                                                                                                                       1--------------

           Fiscal year ending June 30                                           1930              1931              1932       1933             1934

Cost of new work__
Cost of maintenance -----------                                    ------------------------------------                      $1, 335. 72       $8, 781. 25
Total expended.......                                                                                      ----                 310.00          9,593.22

A llotted .-   -   - --   -   --   -   --   -   --   .-   --   -          I-
                                                                    --.......        - - -.                                  21, 409.31    (-----------
Balance unexpended July 1, 1933                                                 _                __----------                          $21, 099.31
Deductions on account of revocation of allotment                                                                                               334. 28

      Net amount to be accounted for--------------------                                                                                   20, 765. 03
Gross amount expended-----------------------------------------                                                                              9, 593. 22

           Balance unexpended                                  June 30, 1934_                             -------                          11,171. 81
   1 In addition $25.000 was expended from contributed                                                    funds.
1396     REPORT      OF CHIEF OF         ENGINEERS,   U. S. ARMY,   1934

Outstanding liabilities June 30, 1934-------------------..$213. 75
Amount covered by uncompleted contracts----------------       1. 55
                                                                              $215. 30

       Balance available June 30, 1934                                      956. 51
                                                                        1---------------------------0

Amount that can be profitably expended in fiscal year ending June
  30, 1936, for maintenance 1--------------                                  2, 000. 00

              17. SALMON RIVER, ALASKA, FLOOD CONTROL

  Location.-Salmon River rises in Canada and flows in a southerly
direction into the southeastern part of Alaska and empties into
Portland Canal at the town of Hyder. Its total length is about
25 miles. (See U. S. Coast and Geodetic Survey Chart No. 8051.)
  Existing project.-This provides for the control of floods at the
town of Hyder by the reconstruction of 681 feet of existing dike,
construction of 3,653 feet of new dike, and clearing of the flood plain
west of the present channel. The estimated cost, made in 1931, is
$53,000 (including $7,000 to be contributed by local interests) for
new work and $1,000 annually for maintenance. The project was
adopted by the act approved June 18, 1934 (H. Doc. 228, 72d Cong.,
1st sess.). The latest published map is in the project document.
  Local cooperation.--In accordance with the provisions of the act
of June 18, 1934, local interests are required to contribute $7,000
toward the first cost of the work and $200 annually for maintenance.
An appropriation of $7,000 was made by the Territorial legislature
in 1933 for this purpose. Prior to the adoption of the existing
project, approximately $8,000 was expended by the United States
Bureau of Public Roads for a rock dike, and $26,350 by Territorial
and local, interests for dikes, revetment, and dredging with view
to flood protection.
   Terminal facilities.-None.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No work has been done under
the existing project.
  Proposed operations.-No funds are available and no operations
are proposed during the fiscal year 1935.
  The sum of $52,000 (including $7,000 to be contributed by local
interests) can be profitably expended during the fiscal year 1936
for completing the project, by contract, April to June 1936, as
follows:
New work :
   Reconstruction of 681 feet of existing dike----------------------- $4,000
   New construction, 3,653 feet of pile, brush, and rock dike----------44, 500
   Clearing flood plain, 32 acres---------------------------------- 3, 500

       Total--------------------------------------------------        ----     52,000
  1 Exclusive of available funds.
                RIVERS AND HARBORS-SEATTLE,                             WASH., DISTRICT                        1397
                                       Cost and financial summary
Cost of new work to June 30, 1934__                     -                                                   ----
Cost of maintenance to June 30, 1934___
      Net total expenditures_
Total amount appropriated to June 30, 1934___
Amount (estimated) required to be appropriated for completion of
   existing project 1__                                                                                     $45, 000
Amount that can be profitably expended in fiscal year ending June 30,
   1936, for new work -                                 __________-____                                      45, 000

   18. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                 (GENERAL)

  The cost of working during the year amounted to $31,823.34; the
expenditures were $30,883.55. The funds unexpended June 30, 1934,
amounting to $50,470.68, will be applied as needed during the fiscal
year 1935 to payment of expenses to be incurred in connection with
the above items. The additional sum of $50,000 can be profitably
expended during the fiscal year 1936.
Cost of maintenance to June 30, 1934__ ____________________-     $184, 283. 98
Minus accounts payable June 30, 1934 ---------------------------      , 008. 48
     Net total expenditures ------------------------------                                             183, 275. 50
Unexpended balance June 30, 1934____ _______    __                                                      50, 470.68

         Total amount appropriated to June 30, 1934_                        __            -__ _--      233, 746. 18

         Fiscal year ending June 30              1930           1931             1932           1933           1934

Cost of new work------.------------                   ----------------------------          ------------
Cost of maintenance....------------------ $34, 799. 18 $29, 732. 04 $28, 173. 57 $36, 926. 22   $31, 823. 34
Total expended-.-------------------------      35, 117. 86    29, 130. 91   28, 697. 23     38, 040. 40      30, 883. 55
Allotted----------------------------........   30, 250. 00    32, 500. 00    7, 287. 79     75, 775. 75      40, 632. 64


Balance unexpended July 1, 1933______________________-$40, 721.59
Amount allotted from War Department Appropriation Act ap-
proved Apr. 26, 1934----------------------------------------- 47, 000. 00

      Amount to be accounted for ______________-_-87,                                                         721. 59
Deductions on account of revocation of allotment__--                                    __-__    -         6, 367. 36

      Net amount to be accounted for-_______-- ___--
                                                  -____--                                                 81, 354. 23
Gross amount expended   -----------------------------------                                               30, 883. 55
      Balance unexpended June 30, 1934 -------------------------                                          50, 470. 68
Outstanding liabilities June 30, 1934________________  $1, 008. 48
Amount covered by uncompleted contracts --------------       2. 75
                                                                                                           1, 011. 23

         Balance available June 30, 1934_ -----------------------                                         49, 459.45

Amount that can be profitably expended in fiscal year ending
June 30, 1936, for maintenance 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - 50, 000. 00
   1 In addition, local interests are to contribute $7,000.
   2 Exclusive of available funds.
1398        REPORT        OF CHIEF          OF ENGINEERS,                                U.          S.         ARMY,             1934

                 19. Other projects for which no estimates are submitted

           [Commercial statistics for these projects are given in pt. 2 of report]


                                                                  For last             Cost and expenditures to
                                                                  full re-                   June 30, 1934                                   Estimated
                    Name of project                               port see                                                                   amount re-
                                                                   annual                                                                     quired to
                                                                   report                                                                     complete
                                                                    foro               New work                        Maintenance
                                                                                                                                        I
                                                                                                                   I



1. Hoquiam River, Wash.1 -           - -                               1933             $51,293.64                        $3, 816. 35        Completed.
2. Waterway connecting Port Townsend Bay and                           1333              73, 322.35                       49, 523. 42          Do.
     Oak Bay Wash.'
3. Port Gamble Harbor, -Wash.' 2_                                      1931             3 11, 911. 08                         588.92            Do.
4. Skagit River, Wash.4 5     ___                                      1931               99, 829. 80                     29, 257.81            $117, 000

-6.
5.Swinomish Slough, Wash. ____
   Anacortes Harbor, Wash.1-
7. Kootenai River, Idaho and M ont.'1
                                         -
                                         ......
                                                                       1932
                                                                       1931
                                                                       1933
                                                                                         183, 029. 51
                                                                                        746, 376. 90
                                                                                           9, 254.54
                                                                                                                          44, 279. 07

                                                                                                                           5,642. 60
                                                                                                                                                  50, 000
                                                                                                                                             Completed.
                                                                                                                                                Do.
8. Columbia River, Wenatchee to Kettle Falls,                          1923             274, 390. 53                       7, 692. 58           Do.
    Wash.8
9. Polson Bay, Flathead Lake, Mont.'1                                  1918               4,491.14                           258.86              Do.
10. Ketchikan Harbor, Alaska 1'-                                       1933             224, 945. 84                                             Do.
11. Wrangell Harbor, Alaska 9________________                          1931              37, 321. 32                         167. 43             Do.
12. Port Alexander, Alaska 1     -         --                          1932              17, 000.00                                              Do.

   1 No maintenance required at present.
   2 Modifications recommended in H. Doc. No. 152, 72d Cong., 1st sess.
   3 In addition, $21,260.09 was expended from contributed funds.
   4 Awaiting local cooperation for work on Skagit City bar; no work required on remainder of project at
present.
   5 Further improvements recommended to be accomplished under the general project recommended for
Puget Sound (H. Doc. No. 311, 70th Cong., 1st sess.).
   6 Further work withheld pending adoption of project recommended under date of May 24, 1933. (S. Com
Print., 73d Cong., 1st sess.).
   7 In addition, $23,188.45 was expended from contributed funds.
   8 Improvements fairly permanent and maintenance not required.
   o Modification recommended in House Doc. No. 202, 72d Cong., 1st sess.

,Status of reports called for by river and harbor acts and committee resolutions


         Locality               Authorization act           Transmitted                                                                 Recommenda-
                                                            to Congress                           Document no.                              tion
                                                       i
                          i



-Bellingham   Harbor,         Rivers and Harbors
  Wash.                         Committee resolu-
                                tion, Jan. 29, 1934.
 ,Chehalis River and          Flood Control Act,
   tributaries, W as h.         June 13, 1934.
   (preliminary examina-
   tion for flood control).
'Columbia River, Wash., Rivers and Harbors                 July 17,1934 __                                             .-_-___.__.I Favorable.
   mouth of Willamette        Committee resolu-
   River to point 1           tion, Jan. 2, 1934.
   mile above Vancouver Rivers and Harbors
   (channels A and B).        Committee resolu-
                              tion, Feb. 27, 1934.
  Columbia River         to Rivers and Harbors
   Puget Sound, Intra-        Committee resolu-
   coastal Waterway.          tion, Aug. 12, 1933.
  Cordova Harbor, Alas- Rivers and Harbors                  Mar. 7, 1934                 Rivers and Harbors                                    Do.
   ka.                        Committee resolu-                                            Committee Doc. No.
                              tion, Apr. 20, 1933.                                         33, 73d Cong., 2d
                                                                                              sess.
:Edmonds Harbor,Wash. Rivers and Harbors                   ...............              ........................
                         Committee resolu-
                         tion, Mar. 15, 1934.
Everett Harbor, Wash__ Senate Committee re-                ...............
                         tion, Jan. 25, 1934.
    Do---------------  Rivers and Harbors
                         Committee resolu-
                         tion, Aug. 7, 1933.
-Gastineau Channel, River and Harbor                        Oct.             3, 1933                                              -     Unfavorable.
  Alaska.                Act, Jan. 21, 1927.
Grays Harbor, Wash___ Rivers and Harbors                    July 17, 1934                                                     _             Favorable.
                         Committee resolu-
                         tion, Sept. 25, 1933.
              RIVERS AND HARBORS-SEATTLE,                                          WASH.,                   DISTRICT     1399
      Status of reports called for by river and harbor acts and committee
                              resolutions-Continued


         Locality               Authorization act                Transmitted                                       Recommenda-
                                                                 to Congress                Document no.               tion


Green River, Wash. Flood Control Act, Mar. 14, 1934                                House Doc. No. 286,             Favorable.
  (preliminary examina-    Feb. 15, 1933.                                           73d Cong., 2d sess.
tion for flood control).
    Do.............-.... Flood Control Act,                                      .....................
                           June 14, 1934.
Ketchikan Creek and Rivers and Harbors Oct. 31, 1933                                                               Unfavorable.
  Saxman Harbor, Ton-      Committee resolu-                                     ........................
  gass Narrows, Alaska.    tion, May 26, 1933.
Kootenai River, Idaho_. Senate Committee re- Feb. 21, 1934                                                             Do.
                           solution, Jan. 31,
                           1933.
Neah Bay, Wash., har- River and Harbor Act, July 8, 1933                                                               Do.
bor of refuge.            July 3, 1930.
Nome Harbor, Alaska_._ Rivers and Harbors Apr. 13,1934                             Rivers and Harbors Favorable.
                           Committee resolu-                                         Committee Doc. No.
                           tion, Oct. 25, 1933.                                      38, 73d Cong., 2d
                                                                                        sess.
Nooksack River and Flood Control Act,
tributaries, W as h.     June 13, 1934.
 (preliminary examina-
tion for flood control).
Nooksack River, What- Flood Control Act,
com County, Wash.        Feb. 26, 1925.
 (preliminary examina-
tion for flood control).
Olympia Harbor, Wash- Rivers and Harbors                         Oct. 13,1933      Rivers and Harbors                  Do .
                          Committee resolu-                                         Committee Doc. No.
                          tion, June 6, 1933.                                        21, 73d Cong., 2d
                                                                                        sess.
Puget Sound and tribu-       Rivers and Harbors                                  .......................
tary waters, Wash.            Committee resolu-
                               tion, Feb. 2, 1934.
Seward Harbor, Alaska,       Rivers and Harbors                  July 17, 1934   ........................              Do.
harbor of refuge.             Committee resolu-
                               tion, Oct. 9, 1933.
Skagit River and tribu-      Flood Control Act,                                  ........................
  taries, Wash. (prelimi-      June 13, 1934.
  nary examination for
  flood control).
Skykomish River, Sno-        Flood Control Act,                                  ........................
  homish County,Wash.          Feb. 26, 1925.
  (preliminary examina-
  tion for flood control).
Snohomish River, Sno-        ....-- do............------------                   ........................
  homishCounty, Wash.
  (preliminaryexamina-
  tion for flood control).
Snohomish River and          Flood Control Act,                                  ........................
  tributaries, Wash.           June 13, 1934.
  (preliminaryexamina-
  tion for flood control).
Snoqualmie River, Sno-        Flood Control Act,                                 ........................
  homish County,Wash.           Feb. 26, 1925.
  (preliminary examina-
  tion for flood control).
Stilaguamish River and        Flood Control Act,
  tributaries, Wash.            June 13, 1934.
  (preliminary examina-
  tion for flood control).
Stilaguamish River, Sno-      Flood Control Act,
  homish County,Wash.          Feb. 26, 1925.
  (preliminary examina-
  tion for flood control).
Willapa River and Har-        Rivers and Harbors                 Apr. 13,1934       Rivers and Harbors                 Do.
  bor, Wash.                    Committee resolu-                                    Committee Dec. No.
                                tion Aug. 12, 1933.                                  37,   73d Cong., 2d
                                                                                     sess.
                                                                                     sess.
1400       REPORT OF CHIEF OF ENGINEERS,            U.   S. ARMY,   1934

IMPROVEMENT OF RIVERS AND HARBORS                                     IN THE
        HONOLULU, HAWAII, DISTRICT
      This district includes all islands in the Hawaiian group.
      District engineer: Maj. S. L. Scott, Corps of Engineers.
      Division engineer: Lt. Col. Thomas M. Robins, Corps of Engineers.
                                    IMPROVEMENTS

                                     Page                                      Page
1.   Honolulu Harbor, Hawaii        1400   5. Port Allen Harobor, Hawaii_     1410
:2.   Kahului Harbor, Hawaii____     1404   6. Kaunakakai Harbor, Hawaii_      1413
3.   Hilo Harbor, Hawaii------.     1406   7. Examinations, surveys, and
4.   Nawiliwili Harbor, Hawaii__    1408        contingencies (general) ___   1414

                       1. HONOLULU HARBOR, HAWAII

    Location.--This harbor is on the south coast of the island of
Oahu, about 2,100 miles from San Francisco. (See U. S. Coast and
Geodetic Survey Chart No. 4109.)
    Existing project.-This provides for an entrance channel 35 feet
'deep and 400 feet wide; deepening the inner harbor to 35 feet, with
a general width of 1,200 feet; easing the curve where the entrance
channel joins the inner harbor; dredging to 35 feet along the reserved
channel a channel 800 feet wide and 1,000 feet long, and thence a
channel along the northerly side of the reserved channel 300 feet
wide and about 3,000 feet long to connect Honolulu Harbor with
Kapalama Basin.
    The plane of reference is mean lower low water. The range of
tide between mean lower low water and mean higher high water is
1.9 feet and the extreme tidal range under ordinary conditions is
:2.3 feet.
      The estimate of cost for new work, revised in 1930, was $3,283,000.
The estimate of cost for annual maintenance, revised in 1930, is
$12,000.
  The existing project was authorized by the following river and
harbor acts: The act of March 3, 1905, provided for all the improve-
ment except the dredging along the reserved channel (Annual Report
of 1905, p. 2565);.the act of August 8, 1917 (H. Doc. No. 392, 64th
Cong., 1st sess.), provided for the channel 800 feet wide and 1,000
feet long; and the act of July 3, 1930 (H. Doc. No. 753, 69th Cong.,
2d sess.), provided for the channel northerly of the reserved channel.
The, latest published map is in the last-mentioned document.
  Supplementing the work authorized by Congress, the further im-
provement of Honolulu Harbor so as to provide for an entrance
channel 40 feet deep at mean lower low water and 500 feet wide;
widening the harbor basin by cutting off a strip of Sand Island
about 320 feet wide, including the replacement of such existing depot
facilities of the Bureau of Lighthouses as are necessarily removed
to make way for the improvement; and the maintenance of the im-
proved portion of the reserved channel for its full width of 400 feet
throughout, as recommended by the Chief of Engineers in House
Document No. 54, Seventy-third Congress, first session, was included
in the Public Works program under the National Industrial
Recovery Act.
        RIVERS       AND HARBORS-HONOLULU,       HAWAII,   DISTRICT    1401
   Rec.mmanended modlifications of prooject.-Included in Public Works
program.
   Ter ninal facilities.-The United States Government controls a
small portion of the water front and has constructed terminal facili-
ties for the use of the Army Transport Service, the Navy, and the
Lighthouse Service. These facilities are not available for general
use. By far the greater part of the improved portion of the water
front is controlled by the Territory, and the facilities thereon, to-
gether with those owned by private interests, are administered by the
Board of Harbor Commissioners of the Territory and are open to all
shipping on equal terms.
   There are 30 piers and wharves, of which 6 are owned by the
United States Government, 14 by the Territory, and the others by
,corporations.
   The facilities are considered adequate for present commerce. (For
.farther details see Port Series No. 17, Corps of Engineers.)
   .Operationsand results during fiscal year.-Under authority of the
Federal Emergency Administrator of Public Works, new work under
contract consisted of dredging the entrance channel 500 feet wide to
a depth of 40 feet at mean lower low water and in widening the
'harbor basin by cutting off a strip of Sand Island about 320 feet
wide. A total of 1,097,243 cubic yards (scow measurement) of ma-
terial was removed by the contractor at a cost of $295,168.65 for
new work. The construction of depot facilities for the Bureau of
Lighthouses to replace those removed to make way for the above
improvement was completed by the contractor at a cost of $24,847.90
for new work.
   In maintenance dredging, conducted with regular funds, the U. S.

.of
dredge San Pablo removed 181,335 cubic yards (place measurement)
     material at a cost of $30,694.97. In addition, harbor patrol and
miscellaneous construction and maintenance work were performed at
a cost of $5,277.53. The total costs were $355,989.05, of which
-$320,016.55 was for new work from Public Works funds and $35,-
972.50 for maintenance from regular funds. The total expenditures
were $334,478.86, including $297,227.75 from Public Works funds.
   Condition at end of fiscal year.-The project adopted by Congress
was completed in 1932. The project authorized by the Federal
Emergency Administration of Public Works is 87 percent completed.
Approximately 963,866 cubic yards remained to be dredged to com-
plete the widening and deepening of the entrance channel and the
widening of the harbor basin. The controlling depth at the close of
the fiscal year was 35 feet at mean lower low water.
   The total cost to June 30, 1934, was $3,773,178.99, of which $3,487,-
579.98 (including $320,016.55 from Public Works funds) was for
new work and $285,599.01 for maintenance. The total expenditures
were $3,792,456.40, including $297,227.75 from Public Works funds.
   Proposed operations.-The balance unexpended June 30, 1934,
from regular appropriations, will be applied as follows:
Maintenance:
   Hydrographic surveys of harbor, by hired labor, July 1934______ $1, 500
   Patrolling harbor and operation of Engineer Department store-
      house, yard, and plant, by hired labor, July 1934-June 1935_____ 7, 500

      Total .    .     ..                                              _9,   000
1402        REPORT         OF CHIEF                     OF ENGINEERS,           U. S. ARMY, 1934

  The balance unexpended June 30, 1934, from funds allotted under
authority of the National Industrial Recovery Act, amounting to
$505,572.25, will be applied to completing the widening and deepen-
ing of the entrance channel and the removal of a portion of Sand
Island, by contract, July-November 1934.
   The additional sum of $15,000 can be profitably expended during
the fiscal year 1936, for maintenance, as follows:
Dredging channels and harbor basin by Government plant and hired
   labor      (September         1935) ------             ________                                                     $7, 000
Patrolling harbor and operation of Engineer Department storehouse,
  yard, and plant, by hired labor, July 1, 1934-June 1935 ------------                                                   8,000
         Total--                 --------------------                                                                  15, 000

                                        Cost and financial sun/mnary
                             MAINTENANCE'                 AND    IMPROVEMENT          FUNDS

Cost of new work to June 30, 1934________________________ $3, 167, 563. 43
Cost of maintenance to June 30, 1934------------------------  285, 599. 01
      Total cost of permanent work to June 30, 1934----------                                                3, 453, 162. 44
Value of plant, materials, etc., on hand June 30, 1934                                ----------                 42, 066.21

          Net total cost to June 30, 1934______-__                                             ____          3, 495, 228. 65

Net total expenditures_______-_____- ________                                                                3,495, 228. 65
Unexpended balance June 30, 1934----------------------------                                                     9,000. 00
          Total amount appropriated to June 30, 1934------------                                             3, 504,228. 65

    Fiscal year ending June 30                   1930             1931            1932                1933             1934


Cost of new work__-
                 ..___.. ..... -$30, 294. 18                  $335, 398. 01    $113, 449. 18     $241, 055. 86   _       --
Cost of maintenance __------...   37, 888. 65                   14, 147. 38       5, 871. 94       24, 390. 85        $35, 972. 50
      Total cost--------   --------              7, 594. 47     349, 545. 39    119, 321. 12      265, 446. 71         35, 972. 50
Total expended-----------------                  4, 680. 97     239, 355. 08    257, 962. 31      276, 977. 85         37, 251. 11

Allotted ______________________......... -45, 172. 43           415, 000. 00    100, 000. 00      295, 101. 08          7, 000. 00


Balance unexpended July 1, 1933_----------------------------$39, 251. 11
Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934------------------------------------------------ 9, 000. 00

                                                                                                                 48, 251. 11
Deductions on account of-
   Revocation of allotment -------------                                                  _ $1, 200. 00
   Revocation of impounded funds__-- --  _________                                       __     800. 00
                                                                                                                     2, 000. 00

      Net amount to be accounted for----------------------------                                                 46,251. 11
Gross amount expended ------------------         ---     $38, 151. 99
Less:
    Reimbursements collected__________________ $900. 38
    Receipts from sales_-------------------          .50
                                                              900. 88
                                                                                                                 37, 251. 11

          Balance unexpended June 30, 1934_----                                                                      9,000. 00

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance _ _______     __                                                                      15, 000. 00

   1Exclusive of available funds.
               RIVERS AND HARBORS-IIONOLULU,                           HAWAII, DISTRICT                 1403
                                                PULIO WORKS FUNDS

Cost of new work to June 30, 1934___                                                             $320, 016. 55
Cost of maintenance to June 30, 19384__                                            ,_

      Total cost of permanent work to June 30, 1934------                           _____         320, 016. 55
Value of plant, materials, etc., on hand June 30, 1934                                               , 796. 71
                                                                                                    1------------
      Net total cost to June 30, 1934_11     ___1      1__       1______
                                                                     321, 813. 26
Plus accounts receivable June 30, 1934___________--_________----        2,448. 77
     Gross total costs to June 30, 1934 ---------------------  324, 262. 03
Minus accounts payable June 30, 1934------------------------27,     034.28

     Net total expenditures_    -         -____ __-______________                                 297, 227. 75
Unexpended balance June 30, 19,34_________-------- -    ----                                      505, 572. 25
            Total amount appropriated to June 30, 1934______                     _____-
                                                                                  -802,                 800. 00

            Fiscal year ending June 30                1930      1931      1932            1933           1934


Cots of new work---......------------------------------------------------ $320, 016. 55
Cost ofmaintenance___
                    .--
Total expended..---------------------------------------------------297, 227.75
Allotted............-------------------   ........-                                       -   - -     802,800.00


Amount allotted from National Industrial Recovery Act approved
JuneJune
        1, 1933
        16,            ______________________
            193--------------------------------------------$86  $836, 400.00
                                                                       0.0
Deductions on account of revocation of allotment_______________   33, 600. 00
      Net amount to be accounted ______-__________________                                        802, 800. 00
Gross amount expended__________________________ $300, 604.90
Less reimbursements collected____________________   3,377. 15
                                                                                                  297, 227. 75
      Balance unexpended June 30, 1934_______________________                                     505, 572. 25
Outstanding liabilities June 30, 1934_________________ $27, 034. 28
Amount covered by uncompleted contracts -------- ___   476, 586. 74
                                                                                                  503, 621. 02
     Balance available June 30, 1934--------------------------                                       1,951. 23
Accounts receivable June 30, 1934------------------------------                                      2, 448. 77

             Unobligated balance available June 30, 1934_                     _________              4,400. 00
         CONSOLIDATED                COST AND   FINANCIAL    SUMMARY    FOR   HONOLULU            HARBOR

Cost of new work to June 30, 1934___     _____---____-$3,                                         487, 579. 98
Cost of maintenance to June 30, 1934____________________-                                         285, 599. 01

      Total cost of permanent work to June 30, 1934------------                               3, 773, 178. 99
Value of plant, materials, etc., on hand June 30, 1934                   ----------               43, 862. 92

                                             -
      Net total cost to June 30, 1934-___________-     ______                                 3, 817, 041. 91
Plus accounts receivable June 30, 1934------------------_                                          2,448. 77

     Gross total costs to June 30, 1934 _______-___________--                                 3, 819, 490. 68
Minus accounts payable June 30, 1934.____________________                                         27, 034.28

                             --------------------
     Net total expenditures-____                                                              3, 792, 456. 40
Unexpended balance June 30, 1934----------------------------                                     514, 572. 25

             Total amount appropriated to June 30, 1934                                       4, 307, 028. 65
                                                                                          -......
1404         REPORT OF CHIEF OF ENGINEERS,                                        U.     S. ARMY,          1934


   Fiscal year ending June 30                      1930              1931           1932            1933              1934


Cost of new work---------                  _--   $30, 294. 18    $335, 398. 01   $113,449.18     $241, 055. 86      $320, 016.-55
Cost of maintenance.    __                __      37, 888. 65      14, 147. 38      5, 871. 94     24, 390. 85        35., 972. 50
      Total cost-----------------...        .      7, 594. 47     349, 545. 39    119, 321. 12    265, 446. 71       355., 989. 05
Total expended -----------------                   4, 680. 97     239, 355. 08    257, 962. 31    276, 977. 85       334, 478. 86
Allotted.--________     ___-   -       -_______ -45, 172. 43      415, 000. 00    100, 000. 00    295, 101. 08       809, 800. 001


Balance unexpended, July 1, 1933______________________________ $39, 251.11
Amount allotted from War Department Appropriation
  Act, approved Apr. 26, 1934 __________-$9,              000. 00
Amount allotted from National Industrial Recovery
  Act, approved June 16, 1933________________________ 836,400. 00
                                                                  845, 400. 00

      Amount             to be accounted for______________________________ 884, 651. 11
Deductions on            account of:
    Revocation            of allotment______--------------       $34, 800. 00
    Revocation            of impounded funJs__                        800. 00
                                                                              35, 600. 00

         Net amount to be accounted for                                                                          849, 051. 11
Gross amount expended_______________---_____--                                               $338, 756. 89
Less :
    Reimbursements                     collected-_________-_ $4, 277.53
      Receipts from sales_---                             -     ------                 .50
                                                                                                 4, 278.03
                                                                                                                 334, 478. 86
      Balance unexpended June 30, 1934 _______________-----             514, 572.25,
Outstanding liabilities, June 30, 194 __-__--------      - $27, 034. 28
Amount covered by uncompleted contracts--------- 476, 586.74
                                                                        503, 621. 02
      Balance available June 30, 1934_____     _________  __                                                      10, 951. 23
Accounts receivable, June 30. 1934__  ________________________                                                     2, 448. 77

         Unobligated               balance         available,        June 30, 1934____________                    13, 400. 00

Amount that can be profitably expended in fiscal year ending June
  30, 1936, for maintenance 1_____________--__________                                               __           15, 000. 00

                                       2. KAH-ULUI HARBOR, HAWAII

  Location.-This harbor is on the north coast of the island of
Maui, about 94 miles southeast of Honolulu. (See U. S. Coast and
Geodetic Survey Chart No. 4105.)
  Existing project.-This provides for the extension to a total
length of 2,850 feet of the privately constructed rubble-mound
breakwater on the east side of the harbor, for a rubble-mound break-
water on the west side with an approximate length of 2,396 feet,
and for the dredging of a basin in the lee of the east breakwater
to a depth of 35 feet, mean lower low water, and a maximum width
of 1.450 feet. The range of tide between mean lower low water
and mean higher high water is 2.4 feet and the extreme tidal range
under normal conditions is 3.4 feet.                                        The estimate of cost for new

   SExclusive of available funds.
       RIVERS AND HARBORS--RONOLULU,             IHAWAII, DISTRICT       1405'
work, revised in 1927, was $1,988,000. The latest (1931) approved
estimate for annual cost of maintenance is $30,000.
   The existing project was authorized by the following river and
harbor acts: The act of June 25, 1910, provided for the extension of
the east breakwater and the dredging of basin (H. Doe. No. 5,93,
61st Cong., 2d sess.), and the act of July 27, 1916, provided for the
west breakwater (H. Doc. No. 1330, 62d Cong., 3d sess.). The act
of January 21, 1927, provided for the extension of both breakwaters
and the enlargement of the dredged basin (H. Doc. No. 235, 69th:
Cong., 1st sess.). The latest published map is in the last-mentioned
document.
   Local cooperation.-Complied with.
   Terminal facilities.-There is one pier and one wharf at the end
of the harbor, both owned by the Territory. Pipe lines for fuel oil,
molasses, kerosene, gasoline, distillate, and water are available. The
facilities are adequate for the commerce. (For further details see
Port Series No. 17, Corps of Engineers.)
   Operations and results during fiscal year.-Minor repairs were
made to the east breakwater by rented plant and hired labor by plac-
ing 191 tons of rock and concrete at a cost of $2,238.87 for mainte-
nance. The U. S. Dredge San Pablo removed 143,000 cubic yards
 (place measurement) of material from the harbor basin at a cost of
$23,198.71 for maintenance. In addition miscellaneous harbor sur-
veys were made and breakwaters and Government property cared
for at cost of $1,817.95 for maintenance.
   The total cost of $27,255.53 for the year was for maintenance.
The total expenditures were $27,120.25.
   Condition at end of fiscal year.-The project was completed in
1931. The controlling depth at last survey, November 1933, was 35
feet at mean lower low water.
   The total cost of the existing project to June 30, 1934, was $2,084,-
403.15, of which $1,778,560.46 was for new work and $305,842.69 for
maintenance. The total expenditure was $2,090,929.54.
   Proposed operations.-The balance unexpended June 30, 1934, will
be applied as follows:
Accounts payable, June 30, 1934 __                                          $48
Maintenance :
    Repair of rubble-mound breakwater by Government plant
      and hired labor (Jan. 1935)------------------------- $10, 000
    Survey of harbor by hired labor and operation of district
      motor boat Mamala, July 1934-June 1935---------- ----   4, 900
                                                                 -----   14, 900

        Total----------------------------------------------------        14, 948
  The additional sum of $70,000 can be profitably expended during
the fiscal year 1936 for maintenance as follows:
Concrete capping, east breakwater, by contract--------------------- $50, 000
Repair of breakwater enrockments by Government plant and hired labor
  (Feb.-June, 19,36) -----------------------------------------------   15, 000
Survey of harbor, Aug. and Sept. 1935, and operation of district motor
  boat Mamala by hired labor July 1935-June 1936-------------------     5, 000
      Total----                                           ----           70, 000
1406             REPORT        OF CHIEF OF ENGINEERS, U. S. ARMY,                                        1934

                                           Cost and financial summary

Cost of new work to June 30, 1934  ------------------------ $1, 778, 560. 46
Cost of maintenance to June 30, 1934------------------------    305, 842. 69

      Total cost of permanent work to June 30, 1934---------- 2, 084, 403. 15
Value of plant, materials, etc., on hand June 30, 1934----------   6, 574. 39

     Net total cost to June 30, 1934---------------------- 2, 090, 977. 54
Minus accounts payable June 30, 1934-----------------------         48. 00

     Net total expenditures________ __-----______                                                            2, 090, 929. 54
Unexpended balance June 30, 1934--------------------------                                                       14, 948. 00

             Total amount appropriated to June 30, 1934-----------                                           2, 105, 877. 54

      Fiscal year ending June 30              1930            1931             1932               1933              1934

Cost of new work------          ____   _   $223,958. 63    $360, 379. 22    $116, 470. 18   ..   ..- ....    ___
Cost of maintenance__                        79, 244. 98     95, 617. 55      26, 918. 04        $4, 612. 77     $27, 255. 53
         Total cost-----------------.       303, 203. 61    455, 996. 77     143, 388. 22         4, 612. 77        27, 255. 53
Total expended---------------               271, 216. 80    503, 776. 47     201, 118. 22         4, 894. 73        27, 120. 25

Allotted---------.......     ------------ 585, 000. 00      150, 000. 00   -----------            8, 817. 58        18, 582. 30


Balance unexpended July 1, 1933_ ---      --  ------          _     $23, 485.95
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934_           ___---------$14, 900. 00
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933 -----------          -    -_ 5, 000. 00
                                                                     19, 900. 00

      Amount to be accounted for___ ---                                       --------                   -      43, 385. 95
Deductions on account of-
    Revocation of allotment_    -______---------                                            $1, 217. 70
    Revocation of impounded funds----------                                                     100. 00
                                                                                                                  1 317 70

       Net amount to be accounted for------------------------                                                   42, 068.25
Gross amount expended---____     -----------                                                                   27,120. 25
        Balance unexpended June 30, 1934---------------------                                                   14, 948.00
Outsta nding liabilities June 30, 1934_______- - - ---      --                                                   -48. 00
              Balance available June 30, 1934                    ______ --            --             -__ _      14, 900.00

Amount that can be profitably expended in fiscal year ending June
  30, 1936, for maintenance 1_________________________________                                                  70, 000. 00

                                        3. HILO HARBOR, HAWAII

  Location.-This harbor is on the east coast of the island of Hawaii,
about 200 miles southeast of Honolulu. (See U. S. Coast and Geo-
detic Survey Chart No. 4103.)
  Existing project.-This provides for a rubble-mound breakwater
10,170 feet long; and for dredging to a depth of 35 feet at mean
lower low water an entrance channel to Kuhio Bay, and an area
within the bay about 1,400 feet wide and 3,000 feet long (areas A, B,
and C).                   The range of tides between mean lower low water and
mean higher high water is 2.3 feet, and the extreme range under

     1 Exclusive of available funds.
        RIVERS AND HARBORS--HONOLULU,                    HAWAII, DISTRICT       1407
ordinary conditions is 3.2 feet. The estimate of cost of new work,
revised in 1925, was $3,800,000. The latest (1925) approved estimate
of annual cost of maintenance is $5,000.
   The existing project was authorized by the following river and
harbor acts: The act of March 2, 1907, provided for a breakwater at
a cost of $1,700,000 (H. Doc. No. 407, 59th Cong., 2d sess.); the act
of July 25, 1912, provided for dredging the entrance to Kuhio Bay
without increasing the original limit of cost (H. Doc. No. 417, 62d
Cong., 2d sess.); and the act of March 3, 1925, provided for the
extension of the breakwater and dredging areas A, B, and C, in the
bay (H. Doc. No. 235, 68th Cong., 1st sess.). The latest published
map is in the last-mentioned document.
   Terminal facilities.-The Territory of Hawaii has constructed
three piers at the head of Kuhio Bay. The facilities are adequate
for the commerce. For further details see Port Series No. 17, Corps
of Engineers.
   Operations and results during fiscal year.In maintenance dredg-
ing of the harbor, the U. S. Dredge San Pablo removed 47,000 cubic
yards (place measurement) of material at a cost of $7,015.23. Mis-
cellaneous surveys were made and breakwater and Government prop-
erty cared for at a cost of $1,043.88 for maintenance.
   The total cost was $8,059.11 for maintenance. The total expendi-
tures were $7,654.33.
   Condition at end of fiscal year.-The project was completed in
1930. The controlling depth at last survey, December 1933, was 35
feet at mean lower low water. The width of the entrance channel
for 35-foot depth was 1,100 feet.
   The total cost of the existing project to June 30, 1934, was
$3,455,853.60, of which $3,408,825.58 was for new work and $47,028.02
for maintenance. The total expenditures were $3,456,996.62.
  Proposed operations.-The balance unexpended June 30, 1934,
will be applied to maintenance as follows:
Repair of breakwater, by Government plant and hired labor,
October-November 1934------------------      ---------------   $3, 500. 00
Hydrographic surveys of harbor by hired labor and operations of
district motor boat Mamala July 1934-June 1935---------------   1, 408. 56

       Total-----------------------------                ----------------   4, 908. 56
  The additional sum of $5,000 can be profitably expended during
the fiscal year 1936 for maintenance of the harbor basin and the
breakwater.
                                 Cost and fina'ncial summary

Cost of new work to June 30, 1934--     ---------------------          $3, 408, 825. 58
Cost of maintenance to June 30, 1934-------------------------               47, 02& 02

      Total cost of permanent work to June 30, 1934----------           3, 455, 853. 60
Value of plant, materials, etc., on hand June 30, 1934-----------            1, 143. 02

      Net total cost to June 30, 1934-----------------------3, 456, 996. 62

Net total expenditures---------------------------------                 3, 456, 996. 62
Unexpended balance June 30, 1934_-----------------------                     4, 908. 56

      Total amount appropriated to June 30, 1934 -----------            3, 461, 905. 18
      91536-ENG 1934-           89
1408         REPORT           OF CHIEF OF ENGINEERS,                  U.   S. ARMY,         1934


    Fiscal year ending June 30            1930           1931          1932.         1933            1934

Cost of new work--.....                $246, 851. 64    $4, 770. 54 ..------------------------------...
C ost of m aintenance_............       15, 950. 88     2, 248. 02    4, 688. 79   $4, 582. 97      $8, 059. 11

       Total cost---------------        262, 802. 52     7, 018. 56    4, 688. 79    4, 582. 97       8, 059. 11

Total expended----------------          323, 647. 59     7, 586. 01    5, 552. 19    4, 637.95        7, 654. 33

Allotted-. ---------                    110, 000. 00   -5, 000. 00-                 11, 846. 62       4, 058. 56


Balance unexpended July 1, 1933                 ----------------------------- $8, 504. 33
Amount allotted from War Department Appropriation Act approved
  Apr. 26, 1934-----------------------------------------                       4, 900. 00

      Amount to be accounted for---------------------------13,                                       404. 33
Deductions on account of:
   Revocation of allotment-------------------------                                 $750. 00
   Revocation of impounded funds--------------------                                  91. 44
                                                                                                     841. 44

      Net amount to be accounted for----1-------------------------2,         562. 89
Gross amount expended______-------------------            $7, 666. 83
Less receipts from sales---                                     2. 50
                                                               1-----------------------------
                                                                         7, 654. 33

         Balance unexpended June 30, 1934_______--------------------                               4, 90'8. 56

Amount that can be profitably expended
                                - - -- - - -
                                                 in fiscal year ending - June     -- - -
                                                  - - - - - - - - -- - - - -- - -
30, 1936, for maintenance - -               ---                                         5, 000. 00

                                   4. NAWILIWILI HARBOR, HAWAII

   Location.-This harbor is on the southeast coast of the island of
Kauai, about 100 miles northwest of Honolulu. (See U. S. Coast
and Geodetic Survey Chart No. 4111.)
   Existing project.-This provides for a rubble-mound breakwater
about 2,150 feet in length along the reef which separates this bay into
an inner and an outer harbor; for an entrance channel 35 feet deep
with a minimum width of 600 feet and a length of about 2,400 feet;
for a harbor basin 35 feet deep, 1,300 feet wide, and with an average
length of about 2,000 feet protected by a filled area in addition to
the protection afforded by the breakwater. The plane of reference
is mean lower low water. The tidal range between mean lower low
water and mean higher high water is about 1.8 feet, the extreme tidal
range being about 4 feet. The estimate of cost for new work, revised
in 1928, was $1,900,000, of which $200,000 was contributed by local
interests. The latest (1931) approved estimate for annual cost of
maintenance is $35,000.
   The existing project was authorized by the River and Harbor Act
of March 2, 1919 (H. Doc. No. 609, 62d Cong., 2d sess.). The latest
published map is found in the last-mentioned document.
   Local cooperation.-Complied with.
   Terminal facilities.--Approximately 47.5 acres of the reef extend-
ing from the west side of the harbor have been reclaimed for ter-
minal facilities. The Territory has constructed a concrete wharf
with concrete-steel transit shed on the southern side of the reclaimed
area.
   1 Exclusive of available funds.
             RIVERS AND HARBORS--HONOLULU,                                    HAWAII,        DISTRICT           1409
  A second wharf without transit shed has been constructed in
prolongation of the present wharf and to the westward. The
existing facilities are adequate for the existing commerce.
  Operations and results during fiscal year.-Surveys were made and
breakwater and Government property cared for at a cost of $5,962.95
for maintenance. During May 1934, 750 tons of rock were stored at
the site of the breakwater for use in emergency repairs.
  In maintenance dredging of the harbor, the U. S. dredge San
Pablo removed 258,000 cubic yards (place measurement) of material
at a cost of $43,890.61. The total cost for the year was $49,853.56
for maintenance. The total expenditures were $46,237.48.
   Condition at end of fiscal year.-The project was completed in
1930. The controlling depth at last survey, October 1933, was 35
feet at mean lower low water.
   The cost of the existing project to June 30, 1934, was $1,343,580.56,
of which $1,197,178.23 was for new work and $146,402.33 for main-
tenance. The total expenditures were $1,363,804.17.
  Proposed operations.-The balance unexpended June 30, 1934, will
be applied to maintenance as follows:
Repair of rubble-mound breakwater by Government plant and hired
labor, July 1934-June 1935 -----------------------     ---------   $4, 000
Surveys and operation of district motor boat Mamala by hired labor,
  July 1934-June 1935----------------------------------              1, 800
           Total           ------------------------------------------------                                      5, 800
  The additional sum of $20,000 can be profitably expended during
the fiscal year 1936 for maintenance as follows:
Dredging harbor basin and entrance channel by Government plant and
  hired labor July 1935__.-__      __    _______-_____             $10, 000
Repairs to breakwater by hired labor July-August 1935______-- -- _   6, 000
Survey of harbor and operations of district motor boat Mamall by
  hired labor, July 1934-June 1935------------------------------ 4, 000

           Total-------------------------                                                                      20, 000(
                                      Cost and financial summnary

Cost of new work to June 30, 1934----------$1,                                                             197, 178.23
Cost of maintenance to June 30, 1934 ---- ________________                                                 146, 402.33
      Total cost of permanent work to June 30, 1934_---------- 1, 343, 580. 56
Value of. plant, materials, etc., on hand June 30, 1934_.......    20, 223. 61
           Net total cost to June 30, 1934----___--1_______________                                    , 363, 804. 17
Net total expenditures  ----------
                              ____________1______                                                      , 363, 804. 1T
Unexpended balance June 30, 1934______ ________-________
                                            --                                                             5, 800.00.
           Total amount appropriated to June 30, 1934                                                 1____..____
                                                                                                      1, 369, 604. 17

   Fiscal year ending June 30                 1930           1931         , 1932              1933             1934


Cost of new work----___                   $211,422. 96     $44, 560. 64
Cost of maintenance                          11, 302. 72    52, 891.83     $4, 685. 81      $13, 532. 97      $49, 853. 56
     Total cost_             -              222, 725. 68    97, 452. 47        4, 685. 81    13, 532. 97       49, 853. 56
Total expended___                           253, 382. 60   135, 190. 50        9, 936. 32    14, 064. 49       46, 237. 48
Allotted    --                       --     115, 000. 00    89, 649. 19   __         _       63, 566. 05          200. 00
1410      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

Balance unexpended July 1, 1933---_____--    ______ __________ $51, 837.48
Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934--------                - ----        ------ __    5, 800. 00
     Amount to be accounted for-------------------------                           57, 637. 48
Deductions on account of-
   Revocation of allotment _  -     -   -_________-- $5,250.00
   Revocation of impounded funds__--------------        350. 00
                                                                                    5, 600. 00
      Net amount to be accounted for-- ------------                      -    _    52, 037. 48
Gross amount expended___----   ---                                 $47, 137.48
Less receipts from sales----------------------------                    900. 00
                                                                                   46, 237. 48

       Balance unexpended June 30, 1934____----------------                         5, 800. 00

Amount that can be profitably expended       in fiscal year ending June
                            1- - - - - -- - -- -- - -- -- - -- -- - -- - -- -- -
30, 1936, for maintenance                                                         20, 000. 00

                        5. PORT ALLEN HARBOR, HAWAII

   Location.-This harbor is located on the southern coast of the
island of Kauai, about 115 miles northwest of Honolulu. (See
U. S. Coast and Geodetic Survey Charts Nos. 4108 and 4117.)
   Existing project.-No project has been authorized by Congress.
The construction of a rubble-mound breakwater about 1,200 feet long
on the east side of the bay; and dredging a harbor basin about 1,000
feet wide, 1,500 feet long and 35 feet deep at mean lower low water,
with an entrance channel 500 feet wide and of the same depth, as
recommended by the Chief of Engineers in House Document No. 30,
Seventy-third Congress, first session, at an estimated cost of $880,000,
including $200,000 to be contributed by local interests, with mainte-
nance estimated at $15,000 annually, was included in the Public
Works program under the National Industrial Recovery Act.
   Recommended modifications of project.--Included in Public Works
program.
   Local cooperation.-Complied with.
   Terminal facilities.-There is a short breakwater and terminal
facilities at the southeastern end of the bay for transfer of cargo by
lighter to and from vessels moored well off shore. Oil and molasses
are pumped through floating pipe lines between shore and ship.
                                        .
    Operations and results during fi      year.--Contract work on the
construction of a rubble-mound breakwater on the east side of the
bay was in progress. There were placed 42,177 tons of rock and
137 feet of breakwater completed. The unit price under the con-
tract was $3.12 per ton, in place. The cost for the year was $139,-
887.49 from Public Works funds and $1,905.18 from contributed
funds, a total of $141,792.67 for new work. The expenditures were
$126,664.81 from Public Works funds and $1,795.73 from contrib-
uted funds, a total of $128,460.54.
    Condition at end of fiscal year.-The project is 20 percent com-
pleted. The work remaining to be done is the completion of the
rubble-mound breakwater to project length of 1,200 feet and the
dredging of a harbor basin about 1,000 feet wide, 1,500 feet long,
and 35 feet deep at mean lower low water with an entrance channel
500 feet wide.
   1 Exclusive of available funds.
            RIVERS AND HARBORS--HONOLULU,                                     HAWAII, DISTRICT                    1411
   The total cost of the existing project to June 30, 1934, was $141,-
792.67 for new work. Of this amount $139,887.49 was from Public
Works funds and $1,905.18 from contributed funds. The expendi-
tures were $126,664.81 from Public Works funds and $1,795.73 from
contributed funds, a total of $128,460.54.
  Proposed operations.-The balance unexpended June 30, 1934,
from funds allotted under authority of the National Industrial Re-
covery Act, amounting to $553,335.19, together with $198,204.27
contributed funds, a total of $751,539.46, will be applied to new
work as follows:
Accounts payable, June 30, 1934______________________________        $13, 332.13
Completing construction of rubble-mound breakwater about 1,200
  feet long, by contract, July 1, 1934-June 1935 ____________ 540, 112. 51
Dredging to a depth of 35 feet a harbor basin, about 1,000 feet wide
  by 1,500 feet long and an entrance channel 500 feet wide, by Gov-
  ernment plant and hired labor, November 1934-June 1935___ 198, 094. 82

          Total          --------------------------------------------                                     751, 539. 46
  The additional sum of $15,000 can be profitably expended during
the fiscal year 1936 for maintenance as follows:
Repairs to breakwater by contract ____________  ___________         $12, 000
Survey of harbor January-March 1936 and operations of district
  motor boat Mamala by hired labor, July 1935-June 1936 .- _____- -   3, 000
          Total --------------                          ----------------------------                            15, 000
                                       Cost and financial summary
                                            UNITED       STATES      FUNDS
Cost of new work to June 30, 1934------------------------                                                $139, 887.49
Cost of maintenance to June 30, 1934___
      Total cost of permanent work to June 30, 1934-----------                                            139, 887. 49
Minus accounts payable, June 30, 1934 ________-  __--____-                                                 13, 222. 68
     Net total expenditures ___________________-_                                                         126, 664.81
Unexpended balance, June 30, 1934 __---_____ ----- ___-                                                   553, 335.19
          Total amount appropriated to June 30, 1934                                _______-680, 000. 00

          Fiscal year ending June 30                   1930           1931          1932          1933           1934

Cost of new work............-----......-----........---------------------------------.................--------- $139,887.49
Cost ofmaintenance----------------------                       -----------------------------------------
Total expended-..............---------------------............-----------......------------------------ 126,664.81
Allotted------------------                                                   ...... ------------
                                                  ------------------------------------                         680, 000. 00


Amount allotted from National Industrial Recovery Act approved
June 16, 1933      --   -------------------------             $680, 000. 00

Amount to be accounted for----___________                             ___________________                 680, 000. 00
                                  -
Gross amount expended_______________-- -                             __________                           126, 664. 81
      Balance unexpended June 30, 1934________________________                                            553, 335.19
Outstanding liabilities June 30, 1934_________________$13, 222. 68
Amount coverec by uncompleted contracts ________-540, 112. 51
                                                                                                          553, 335. 19
Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance - _ -__ -----------                                                             15, 000. 00
   1 E~xclusive of available funds.
1412           REPORT OF CHIEF OF ENGINEERS,                                          U. S. ARMY,            1934

                                                      CONTRIBUTED            FUNDS


Cost of new work to June 30, 1934________________________________                                                  $1, 905. 18
Cost of maintenance to June 30, 1934_
      Total cost of permanent work to June 30, 1934___--1--     _
Minus accounts payable June 30, 1934_____________________________
                                                                                                                    1, 905. 18
                                                                                                                       109. 45
     Net total expenditures_________________________________                                                        1, 795. 73
Unexpendel balance June 30, 1934 __198,                                                                                204. 27
           Total amount contributed to June 30, 1934 ...                                         --.....          200, 000. 00

           Fiscal year ending June 30                          1930            1931       1932             1933         1934


Cost of new work         ------------------------------------------------------------                                  $1,905. 18
Cost of maintenance-------------------------------
'Total expended                                                                                                         1, 795. 73
,Contributed ----------       ---------     -------    -                                                              200, 000. CO


Funds contributed for improvements of Port Allen Harbor, Hawaii
  (act of Mar. 4, 1915) ---------------------------------------
                                                              ___ $200, 000. 00
Gross amount expended_                     ---              -        1, 795. 73

      Balance unexpended June 30, 1934 --.....                                                                    198, 204. 27
Outstanding liabilities June 30, 1934                                                          $109. 45
Amount covered by uncompleted contracts_--- ---                                              13, 427.00
                                                                                                                   13, 536. 45

           Balance available June 30, 1934--                                _____________________                 184, 667. 82

       CONSOLIDATED              COST AND FINANCIAL                     SUMMARY        FOR PORT ALLEN             HARBOR

Cost of new work to June 30, 1934____________________________ $141, 792. 67
Cost of maintenance to June 30, 1934_________

      Total cost of permanent work to June 30, 1934_____________                                                  141, 792. 67
Minus accounts payable June 30, 1934_____________________                                                          13, 332. 13

     Net total expenditures_----                                                                                  128, 460. 54
Unexpended balance June 30, 1934---------------------                                                             751, 539. 46

           Total amount appropriated and contributed to June 30,
             1934 ----------------------------------------   ---                                                  880, 000. 00

           Fiscal year ending June 30                          1930            1931       1932             1933         1934


Cost of new work_----------.--------------------------------.------------                                            $141, 792. 67
                   .------------.--------------------.--------.------------
Cost of maintenance----
Total expended....------------------------------------------------------                                              128, 460. 54
Allotted and contributed-_------------                            ------------------------------------                880, 000. 00


Funds contributed for improvement of Port Allen Harbor, Hawaii
   (act of Mar. 4, 1915) -----------------------------------                  $200, 000. 00
Amount allotted from National Industrial Recovery Act approved
  June 16, 1933-------------------------                     ----------------  680, 000. 00

       Amount to be accounted for__--------------------------                                                     880, 000.00
Gross amount expended ----------------------------------                                                         128, 460. 54

            Balance unexpended June 30, 1934                                    ------------                      751, 539.46
         RIVERS AND HARBORS-HONOLULU,                  HAWAII, DISTRICT      1413
Outstanding liabilities June 30, 1934-__- ____---  $13, 332. 13
Amount covered by uncompleted contracts -- _____--553, 539. 51
                                                                       $566, 871. 64

       Balance available June 30, 1934 _____----     ____-_------      184, 667. 82

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1____________________________        _        15, 000. 00

                      6. KAUNAKAKAI HARBOR, HAWAII

   Location.-This harbor is located centrally on the southern coast
,of the island of Molokai, about 54 miles southeast of Honolulu. (See
U. S. Coast and Geodetic Survey Chart No. 4121.)
   Existing project.-No work has been authorized by Congress. The
provision for dredging a harbor basin about 1,500 feet long, 600
feet wide, and 23 feet deep at mean lower low water, as recommended
by the Chief of Engineers in House Document No. 35, Seventy-third
Congress, first session, at an estimated cost of $120,000, with mainte-
nance estimated at the rate of $5,000 annually, was included in the
Public Works program under the National Industrial Recovery Act.
   Recommended modifications of project.-Included in Public Works
program.
   Local cooperation.-Complied with.
   Terminal facilities.-There is one open reinforced concrete wharf
which is owned by the Territory and is open to all on equal terms.
   Operations and results during fiscal year.-Under authority of the
Federal Emergency Administration of Public Works the dredging
of a harbor basin about 1,500 feet long, 600 feet wide, and 23 feet
deep was completed by the contractor January 17, 1934.
   The quantity removed was 297,660 cubic yards (place measure-
ment) of material at a cost and expenditure of $103,107.28 for new
-work.
  Condition at end of fiscal year.-The project was completed Janu-
ary 17, 1934, at a saving of $16,892 under the estimated cost. The
controlling depth is 24 feet at mean lower low water.
  The total costs and expenditures were $103,107.28 for new work.
  Proposed operations.-The balance unexpended June 30, 1934,
$92.72, will be expended for accounts payable. No operations are
proposed during the fiscal year 1935.
  The sum of $10,000 can be profitably expended during the fiscal
year 1936 for maintenance dredging of harbor basin by contract dur-
ing September 1935.
                             Cost and financial summary

,Cost of new work to June 30, 1934_ ....... __        __---__   ____ $103, 107. 28
Cost of maintenance to June 30, 1934_________         __________       __

      Total cost of permanent work to June 30, 1934 ---------           103, 107. 28

Net total expenditures ____-_ ___________               ____----       103, 107.28
Unexpended balance June 30, 1934- -------                      ---
                                                   __....--- __----     -    92. 72

      Total amount appropriated to June 30, 1934--------------         103, 200. 00

   Exclusive of available funds.
1414           REPORT OF                  CHIEF OF ENGINEERS,                               U.     S.    ARMY,           1934


           Fiscal year ending June 30                           1930               1931               1932             1933          1934


Cost of new work.                                   ------------------------------------------
                                           ------------                                                                           $103, 107. 28
Cost of maintenance----                          ----------------------------------------------------------
Total expended........------------------------                                                                                     103, 107. 28
Allotted----         -------------------
                           -             ------------------------------------                                    -----------       103, 200. 00


Amount allotted from National Industrial Recovery Act approved
June 16, 1933--------     --------  ---------------------- $120, 000. 00

Amount to be accounted for ----        ----  _____                                                      -__-_____-            12,0, 000. 00
Deductions on account of revocation of allotment--                                                       -__----- -            16, 800. 00

      Net amount to be accounted for--                                            ___            __------____--103:,               200. 00
                       .
Gross amount expended_----  -.-     -                                         -        --
                                                                                      _________--_                            103, 107. 28

           Balance unexpended June 30, 1934_.____--                                        --.               _______---                92. 72

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1 ______- -____              --
                                                  - ____________                                                                 10, 000. 00

     7. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                                    (GENERAL)

  The cost and expenditures during the year amounted to $2,780.73.
The balance unexpended at the end of the year, amounting to
$3,936.60, will be applied as needed during the fiscal year 1935 to
payment of accounts payable June 30, 1934, and of expenses to be
incurred in connection with the above items. The additional sum
of $3,000 can be profitably expended during the fiscal year 1936.
                                                 Cost and ftnancial sumnmary
Cost of maintenance to June 30, 1934_.....____..__--                                             -.                ___.       $31, 097. 98
Net total expenditures__     ___   ______----------_____-                                                                        31, 097. 98
Unexpended balance June 30, 1934_________    ___________ ____                                                                     3, 936. 60
            Total amount appropriated to June 30, 1934_--- ______----_                                                           35, 034. 58

           Fiscal year ending June 30                            1930               1931              1932             1933           1934

Cost of new work.............--------
Cost of maintenance...----------------------------                             $6,327. 66        $20,105. 70       $1, 973. 89      $2, 780. 73

Total expended                ---------------------         ------------           5, 382. 25      20, 937. 43      1,997. 57         2, 780. 73
Allotted               --------------------------          ------------            7, 000. 00      17, 500.00       2, 000. 00        6, 534. 5


Balance unexpended July 1, 1933        ______--------------------------------                                                      $1821. 75
Amount allotted from War Department Appropriation Act
  approved Apr. 26, 1934__----------------------                $3, 900.00
Amount allotted from War Department Appropriation Act
  approved Mar. 4, 1933---------------------------------          2, 800. 00
                                                                                                                                  6,,700.00

           Amount to be accounted for ____--                                 ---      --                          _-_-
                                                                                                                 ______6, 882. 75

    1 Exclusive of availabl4 funds.
              RIVERS AND HARBORS--PUERTO            RICO   DISTRICT          1415
Deductions on account of:
    Revocation of allotment___ ---- ____                    02
                                                        $5-2_.
    Revocation of impounded funds______________________ 113.40
                                                                        $165. 42

      Net amount to be accounted for_____________________________ 6, 717. 33
Gross amount expended-.....     _______-                       -  2, 780. 73
Balance unexpended June 30, 1934-------------------------------        3, 936. 60

Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1____________________                  3, 000. 00

  IMPROVEMENT OF RIVERS AND HARBORS IN THE
            PUERTO RICO DISTRICT
  This district includes the rivers and harbors of Puerto Rico and
adjacent islands.                                                                    f   t




  District engineer: Lt. Col. E. D. Ardery, Corps of Engineers.                              i




  Division engineer: Col. G. M. Hoffman, Corps of Engineers.
                                    IMPROVEMENTS

                                     Page                                     Page
1. San Juan Harbor, P. R_-__         1415   5. Reclamation of swamp areas_    1422
2. Mayaguez Harbor, P. R-----        1417   6. Other projects for which no
3. Examinations, surveys, and                   estimates are submitted__     1424
     contingencies (general) __      1419
4. Construction of roads and
     bridges           -___-_-      142;0

                           1. SAN JUAN HARBOR, P. R.

   Location.-The harbor is located on the north coast of Puerto Rico,
about 30 miles westward of Cape San Juan. (See U. S. Coast and
Geodetic Survey Chart No. 908.)
   Proevious projects.-Before the American occupation about $647,000
had been expended under Spanish administration. The original
project by the United States was authorized by the River and Har-
bor Act of March 2, 1907. The cost and expenditure on the project
adopted by the United States were $747,684.28 for new work and
$44,730.86 for maintenance, a total of $792,415.14.      (For further
details see p. 2007, Annual Report for 1915, and p. 1718 of Annual
Report for 1916.)
   Existing project.-This provides for a channel 30 feet deep at mean
low water and 600 feet wide at the entrance, and thence 500 feet
wide along the main fairway to a point opposite the city of San Juan,
a distance of 11/4 miles; dredging to the same depth an area of
about 162 acres within the harbor proper, and extending this depth
into the San Antonio Channel for about 4,200 feet, with a width of
about 1,200 feet at its mouth, narrowing to 600 feet 2,000 feet from
the mouth, increasing to 800 feet at the easterly end. The mean tidal
range is about 1.1 feet, and the extreme varies between 0.4 and 1.8
feet.
   The estimated cost of new work, revised in 1919, was $1,700,000, ex-
clusive of amounts expended under previous projects. The latest
 (1918) approved estimate for annual maintenance is $24,000.
   E1xclusive of available funds.
1416    REPORT OF CHIEF OF ENGINEERS,                     U.      S. ARMY,   193 4

  The existing project was adopted by the River and Harbor Act of
August 8, 1917 (H. Doc. No. 865, 63d Cong., 2d sess.), and modified
by the River and Harbor Act of September 22, 1922 (H. Rept. No.
775, 67th Cong., 2d sess.), and the River and Harbor Act approved
July 3, 1930, modified the conditions of local cooperation. The latest
published map is printed in the first-mentioned document.
  Local cooperation.-The River and Harbor Act of July 3, 1930,
modified former conditions of local cooperation as follows:
  The existing project for the improvement of San Juan Harbor, Puerto Rico,
is hereby modified in accordance with the report of the Chief of Engineers
submitted April 9, 1930, so as to fix the total amount of cash cooperation re-
quired from the people of Puerto Rico, at $150,000, which amount shall become
payable 5 years from the date of the approval of this act: Provided, That
the foregoing modification of the project stated shall be conditional upon the
communication by the Government of Puerto Rico to the Secretary of War,
within 1 year immediately following the date of approval of this act, of the
acceptance by the Government of Puerto Rico of the arrangement hereinbefore
outlined.
   The report of the Chief of Engineers referred to is printed as
Rivers and Harbors Committee Document No. 45, Seventy-first Con-
gress, second session.
   Terminal facilities.-There are six piers with aggregate berthing
space of about 6,530 feet and bulkhead wharves of an aggregate
length of about 3,750 feet on the northerly side of San Juan Harbor
including San Antonio Channel, capable of docking deep-draft ves-
sels. For further details see Port Series No. 21, Corps of Engineers.
   Operations and results during fiscal year.-Supervision of navi-
gable waters of Puerto Rico and maintenance of the United States
Engineer suboffice at San Juan, P. R., and preservation and repair
of buildings and grounds were continued. The laid-up plant was
overhauled and has been used since January 1934 under rental in
connection with reclamation work that is being done under the
National Industrial Recovery Act.
   The costs for the year were $2,126.63, all for maintenance. The
total expenditures were $4,525.55.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1928. The controlling depth in the entrance channel on
June 30, 1934, was about 30 feet at mean low water, and in the main
harbor and San Antonio Channel was 30 feet at mean low water.
   The costs of the existing project to the end of the fiscal year
were $1,825,162.45 for new work and $488,245.14 for maintenance, a.
total of $2,313,407.59. The total expenditures were $2,315,119.78.
   Proposed operations.-It is proposed to apply the funds unex-
pended and accounts receivable on June 30, 1934, amounting to
$18,960.01, as follows:
Accounts payable June 30, 1934----     --------------------------                      $707.21
Maintenance of San Juan office and plant rented in connection with
  reclamation work and preservation and repair of buildings and
                                                              _18,
  grounds, assigned to the Engineer Department------------------                        252. 80

       Total------------      ---------------------------------                      18, 960. 01
   The sum of $5,000 can be profitably expended during the fiscal
year 1936 for preservation and repair of buildings, structures, and
grounds, assigned to the Engineer Department, and maintenance of
laid-up plant.
                       RIVERS AND HARBORS-PUERTO RICO DISTRICT                                                          1417
                                               Cost and financial summary
Cost of new work to June 30, 1934---------------------- $2, 572,846.73
Cost of maintenance to June 30, 1934_---__ ___--_______     532, 976. 00
      Total cost of permanent work to June 30, 1934 .____         3, 105, 822. 73
Value of plant, materials, etc., on hand June 30, 1934-----------    -1, 206. 00
      Net total cost to June 30, 1934                                 ---------------------                  3, 104, 616. 67
Plus accounts receivable June 30, 1934                                     ___------_-_---                        8--625. 40
                                                                                                                  3,

     Gross total costs to June 30, 1934 ___   ________--                                                     3, 108, 242. 13
Minus accounts payable June 30, 1934- -_____________---___-                                                          707. 21

     Net total expenditures-----------------3,                                                                    107, 534. 92
Unexpended balance June 30, 1934---------------------------                                                        15, 334. 55

           Total amount appropriated to June 30, 1934-----------__                                           3, 122, 869. 47

    Fiscal year ending June 30                     1930            1931            1932              1933              1934


Cost of new work.........--------------          $46, 892. 66 -
Cost of maintenance-------------__                 8, 359. 22     $9, 305. 35   $140, 899. 13      $28, 258. 27        $2, 126. 63

        Total cost----------------                55, 251.88      9, 305. 35     140, 899. 13       28, 258. 27         2, 126. 63
Total expended--...........--------------...      12, 408. 48     14, 475. 31    109, 543. 17       20, 426. 38         4, 525. 55

Allotted ----------------------                   10, 000. 00      8, 200. 00    135, 000. 00        -657.   44        11, 862. 81


Balance unexpended July 1, 1933____----_--  ---------------       $7, 997. 29;
Amount allotted from War Department Appropriation Act approved
  Apr. 26, 1934   ----------------------------------------------- 12, 000. 00

     Amount to be accounted for________________--                                           _         _____ 19, 997.29
Deductions on account of revocation of allotment                                                                    19 137.
                                                                                                                1____________---

      Net amount to be accounted for----                                                          _____-19,            860. 10
Gross amount expended __________-----                                     _______...              $9, 554. 31
Less:
                               ---
    Reimbursements collected____       -                                  -_    $5, 020. 36
    Receipts from sales_-----                                                         8. 40
                                                                                      8--------------
                                                                                               5, 028. 76
                                                                                                                     4, 525. 55

      Balance unexpended June 30, 1934______________________ 15, 334. 55
Outstanding liabilities June 30, 1934 ---- __---------   - $940. 28
Amount covered by uncompleted contracts ___________    -    120. 90
                                                                    1, 061. 18

      Balance available June 30, 1934 ______         -_______-----                                                  14, 273. 37
Accounts receivable June 30, 1934-_,___------------------                                                         _3, 625. 46

            Unobligated balance available June 30, 1934 ____                                    ___________ 17, 898. 83

Amount that can be profitably expended in fiscal year ending June 30,
1936 for maintenance 1____________________________________                                                          5, 000. 00

                               2. MAYAGUEZ HARBOR, PUERTO RICO
  Location.-The harbor is located at about the center of the west
coast of Puerto Rico. The harbor lies between Point Algorrobo and
Point Guanajibo, about 33/4 miles apart, and extensive coral reefs
about 2 miles offshore.                             (See U. S. Coast and Geodetic Chart No.
901.)
    1Eelusive of available              funds.
1418      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934                         "

   Existing project.-No work has been authorized by Congress.
    The provision of a channel of approach to the terminal 30 feet
deep, with a width of 500 feet from its inshore end to a point opposite
the westerly end of the terminal, thence increasing in width to
1,000 feet at the 30-foot contour, as recommended by the Chief of
Engineers in House Document No. 215, Seventy-second Congress,
first session, at an estimated cost of $179,000, with $3,000 annually
for maintenance, was included in the Public Works program under
the National Industrial Recovery Act.
   Recommended modifications of project.-Under date of April 10,
1934, the Chief of Engineers recommends the improvement of Maya-
guez Harbor, as recommended in House Document No. 215, Seventy-
second Congress, first session, with the further proviso that the
U  nited States shall reimburse local interests for such expenditures,
not to exceed $21,000, as have been made by them for dredging within
the project area recommended in the above document (Rivers and
Harbors Committee Doc. No. 1, 73d Cong., 1st sess.).
   Local cooperation.-Fully complied with.
   Terminal facilities.-The terminals consist of three small piers
used by lighters, located in shoal water in the east central sec-
tion of the harbor and a modern deep-water terminal consisting of
a bulkhead wharf about 1,270 feet in length and a storage shed 60
by 600 feet immediately shoreward thereof, located in the north-
east section of the harbor.
   Operationsand results during fiscal year.-Under authority of the
Federal Emergency Administration of Public Works a contract for
new work of dredging begun on January 5, 1934, was completed on
April 15, 1934. The cost for the year was $146,499.70, all for new
work. The total expenditures were $146,273.71.
    Condition at end of fiscal year.--The project was completed on
April 15, 1934. The controlling depth throughout the project was 30
feet at mean low water on June 30, 1934.
    The costs were $146,499.70 and the expenditures $146,273.71, all for
new work.
   Proposed operations.-Thebalance unexpended including accounts
receivable, $32,732.44, will be applied as follows:
Accounts payable-                                                            14
                                                                         $--------------
Balance remaining -----------------------------             __    _   32, 500. 30

                                                                       32, 732. 44
  No additional funds can be profitably expended during the fiscal
year ending June 30, 1936.
                               Cost and financial summary
Cost of new work to June 30, 1934-----------------------          $146, 491. 70
Cost of maintenance to June 30, 1934......                                   .___________.
      Total cost of permanent work to June 30, 1934____________       146, 4991. 70
Plus accounts receivable June 30, 1934_                                          15
                                                                              6__-_________-_
                                                                              6.

      Gross total costs to June 30, 1934 ____-________________        146, 505. 85
Minus accounts payable June 30, 1934---------------------------            232. 14
     Net total expenditures---                                             273. 71
                                                                      1---------------46,
Unexpended balance June 30, 1934--__ ---------------                   32, 726. 29
        Total amount appropriated to June 30, 1934_                    79, 000. 00
                                                                      1-------------
                     RIVERS AND HARBORS-PUERTO RICO DISTRICT                                                                   1419

          Fiscal year ending June 30                                   1930     1931         1932          1933                1934

Cost of new work-------------------------------------------------------- $146,499.70
Cost of maintenance....-------------------------------------------------------------
Total expended ....          ---------------------------------------                                                         146, 273.6,271
Allotted------             ------------------------- ---------------------------------                                       179,000.00


Amount allotted from National Industrial Recovery Act approved
  June 16, 1933----------------------------------------             $179, 000. 00
Gross amount expended-----------------------            $146,274.46
Less receipts from sales_----___-------------                   .75
                                                                     146, 273. 71

      Balance unexpended June 30, 1934 -------------------                                                             32, 726. 29
Outstanding liabilities June 30, 1934_ ---------------------------                                                         232. 14

     Balance available June 30, 1934_____111__1111111....1                                                             32, 494.15
Accounts receivable June 30, 1934 _------_-------_--_-------                                                                 6.15

           Unobligated balance available June 30, 1934____-                                          __-               32, 500. 30

     3. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                           (GENERAL)

  The cost of the work during the year amounted to $3,549.13. Ther
expenditures were $3,401.64. The balance unexpended on June 30,
1934, amounting to $6,563.55, will be applied in the settlement of'
accounts payable June 30, 1934, and as needed during the fiscal year
1935 to payment of expenses to be incurred in connection with the
above items. The sum of $5,000 can be profitably expended during
the fiscal year ending June 30, 1936.
                                              Cost       and financial summary
Cost of maintenance to June 30, 1934__.__________--__---                                                               $15, 923. 09
Minus accounts payable June 30, 1934     __---------------------------                                                       52. 61

      Net total expenditures             ____________
                                ------------                                                                            15, 770. 4
Unexpended balance June 30, 1934----------------------------6,                                                              563. 5

           Total amount appropriated to June 30, 1934- -- ___.________                                                 22, 334, 03

           Fiscal year ending June 30                                  1930      1931         1932          1933               1934


Cost of new work--------------------          --------------------------------------------
Cost of maintenance      ____-------------------
                                            $2, 621. 40 $4, 644.88 $1, 787. 17 $2, 826, 48 $3, 549, 13
                                                                                                                         -
Total expended...................-----------------------           2, 649. 68   4, 171. 54   2,295. 96     2, 823.10           3,4 1.64
Allotted---_-----------------------------                          3,500.00     1,000.00     1, 000. 00    7,306,60            4, 877. 43:


Balance unexpended July 1, 1933                                $5, 087.7tf
Amount allotted from War Department Appropriation Act approved
  April 26, 1934-------------------   ---------------------- 5, 000. 00

      Amount to be accounted for---       -----------------------                                                       10, 087. 76
Deductions on account of revocation of allotment ------------------                                                         122. 57
           Net amount to be accounted for-----------                                                               -     9, 965. 19
1420     REPORT      OF   CHIEF OF ENGINEERS,             U.   S.   ARMY,    1934

Gross amount expended--------------                                  $3, 487. 99
Less reimbursemehnts collected-___-----_______-                 -     -   86. 35
                                                                                    $3, 401. 64

      Balance unexpended June 30, 1934_______________-----_6, 563. 55
Outstanding liabilities June 30, 1934____-....... .___----------- 160. 34

       Balance available June 30, 1934 ______11.               __________            6, 403.21

Amount that can be profitably expended in fiscal year ending June
                           1-- - - - - -- - -- - - -- - -- -- - - -- -- - -- - --
30, 1936, for maintenance                                                           5, 000. 00

                4. CONSTRUCTION OF ROADS AND BRIDGES

   Location.-Various localities on the Island of Puerto Rico.
   Existing project.-No work has been authorized by Congress. The
work is authorized by the Federal Emergency Administration of
Public Works under the National Industrial Recovery Act and is
being executed by the Engineer Department at the request of the
Bureau of Insular Affairs. Funds are being disbursed by the
Finance Department of the Army. The work includes the construc-
tion of municipal roads to serve as feeders to the insular road net,
the construction of bridges, principally on the south shore of the
island, and the construction of links in the insular road system.
The roads are to be constructed of water-bound Telford macadam,
and the bridges are to be of reinforced concrete.
   Local cooperation.-In determining the work to be undertaken,
the approval of the Governor of Puerto Rico is required, and all
work will be done in cooperation with the insular authorities.
   Operationsand results during fiscal year.-Operationsunder eight
contracts for road construction were in progress at the end of the
fiscal year. Contracts had been entered into for thliee additional
roads. Bids had been invited for three roads and plans and specifica-
tions were in preparation for all remaining roads and bridges to be
constructed.
   The costs for the year, all for new work, were $119,390.42 for roads
and $5,111.69 for bridges, a total of $124,502.11.
   The total expenditures were $81,915.75.
   Condition at end of ~fial year.-The project is about 12 percent
completed based on the funds available. Construction was in prog-
ress -on 8 road. There remains to be done to complete the project,
completion of construction of 8 roads now in progress, and com-
mencement and completion of work on 9 other roads and 8 bridges.
   The total cost for the year was $124,502.11, all for new work.
The, total expenditures were $81,915.75.
   Proposed operations.-It is proposed to apply the funds unex-
pended, including accounts receivable on June 30, 1934, from allot-
ment under the National Industrial Recovery Act, amounting to
 $918,089.99, as follows:
  1Exclusive of available funds.
             RIVERS AND HARBORS-PUERTO RICO DISTRICT                           1421
Accounts payable June 30, 1934_---_  --        __     __--_______-        $50, 278. 28
New work:
    Construction of municipal roads, under contracts in force, to be
      completed in the months indicated:
        Fronton-Ciales, October 1934, 7 km-_______- -       $16, 700
        Maguayo-Dorado, November 1934, 4.4 km-------- 18, 300
        Tierras Nuevas-Manati, December 1934, 5 km-          21,400
        Borinquen-Aguadilla, March 1935, 5.8 km........      32, 900
        Rio Prieto-Lares, September 1934, 3.5 km_... ____ 18, 700
        Rancheras-Yauco, October 1934, 4 km _____--          20, 800
        Joyuda-Cabo Rojo, March 1935, 6 km- ___-___---        28, 000
        Guilarte-Adjuntas, August 1934, 3.2 km---------- 12, 100
         Guama-San German, November 1934, 4.5 km-....        30, 200
                                                                          199, 100. 00
     Construction of insular road bridges by contract:
        Martin Pena Channel, November 1934-September
           1935----------------------------------           90, 100
        Patillas River, October 1934-March 1935_---    __ - 34, 300
        Guamani River, October 1934-June 1935_........      34, 800
        Caguitas River, September 1934-March 1935-___.      25, 500
        Tallaboa River, September 1934-May 1935 _......     37, 100
        Villodas River, October 1934-April 1935--.----    - 20, 000
        Velazquez (Coamo) River, November 1934-May
           1935   -----------------------------------       20, 000
         Jacaguas River, November 1934-July 1935_-----      39, 800
                                                                          310, 600. 00
     Examinations and surveys of bridge sites:
        Anasco River    -------------------------------  700
        Salinas River       ___     ____    ____ ____-   200
        Jueyes River    -------------------------------- 200
                                                                             1, 100. 00
     Construction of insular roads by contract:
        Cayey-Cidra, August 1934-April 1935, 6.7 km.__ 62, 800
        Trujillo Alto-Gurabo, existing contract to be com-
           pleted, December 1934, 4 km ---------                33,100
        Camuy-San Sebastian, August 1934-April 1935,
           5.9 km ---------------------------------             54, 800
        Rio Grande-Loiza, existing contract to be com-
           pleted, December 1934, 3.5 km __-___----             17,200
        Vega Baja-Morovis, existing contract to be com-
           pleteid,;DeGeber 1934; 2.5 km---------------30,          700
        Lajas-Guanica (Vaiiat Lajas), existing con-
           tract to be completed, September 1934, 0.6 km__       3, 800
        Guayama-Carite, August 1934-December 1934,
           2 km ----    -----------------------------           44, 000
        Coamo-Orocovis,      September           1934-June 1935
           7 km -------------------                    ---      76, 400
                                                                          32   82.0000
     Eixainations and surveys of insular roads:
         Jayuya-Ponce--------------------------------------     500. 00
         Unallocated balance--------------------------------33, 711. 71

            Total for all work --------------------------                  918, 089. 99
   It, is expected that all work will be completed by September 30,
1935.
                              Cost and financial summary

Cost of 'new work to June 30, 1934 ------------------------- $124, 502. 11
Cost of maintenance to June 30, 1934-....   .     ---

       Total cost of permanent work to June 30, 1934------------           124, 502. 11
Value of plant, materials, etc., on hand June 30, 1934----------            7, 686. 18

        Net total cost to June 30, 1934-------------------                 132, 188. 29
1422             REPORT OF                     CHIEF OF ENGINEERS,                         U.     S.     ARMY,             1934

Plus accounts receivable June 30, 1934_____._________-- --                                                                 -            $5. 74

     Gross total costs to June 30, 1934__________________                                                                      132, 194. 03
Minus accounts payable June 30, 1934__.___--__-___--__                                                                          50, 278. 28
     Net total expenditures___________-___________                                                                              81, 915. 75
Unexpended balance June 30, 1934__--________-                                                                                  918, 084.25
              Total amount appropriated to June 30, 1934 -1,                                                                   000, 000. 00

     Fiscal year ending June 30                        1930             1931                  1932                1933               1934

Cost of new work-------------...............      --......---                       ..-----------------------...........           $124, 502.11
Cost of maintenance--                       I-------------- .---- ------
                                       -...-----                         --------------------------- -----
Total expended---                                    ---------..----------------------------
                                        ----.................                                           81, 915. 75
Allotted-----..............----------.......       .            -------------------------------------.
                                                                    .       .                                                     1, 000, 000. 00


Amount allotted from National Industrial Recovery Act ap-
  proved June 16, 1933------------------ ------------------ $1, 000, 000. 00
Gross amount expended __-    -___- ________--______-    _        81, 915. 75

      Balance unexepended June 30, 1934 -------- __-__-___                                                                     918, 084. 25
Outstanding liabilities June 30, 1934______ __- $12, 982.49
Amount covered by uncompleted contracts-------- 274, 879. 19
                                                                                                                               287, 861. 68

     Balance available June 30, 1934-----------------------                                                                    630, 222.57
Accounts receivable June 30, 1934- -------------------------                                                                          5. 74

             Unobligated balance available June 30, 1934 ---.-----                                                             630, 228. 31

                                       5. RECLAMATION OF SWAMP AREAS

   Location.-Swamp areas adjacent to San Juan Harbor and Ponce
Harbor, P. R.
   Existing project.-No work has been authorized by Congress. The
provision for filling four malarial swamp land areas in San Juan
Harbor and one area in Ponce Harbor by the hydraulic method, and
the use of one area in San Juan Harbor and the area in Ponce
Harbor for airplane landing fields, and reclamation of two malarial
swamp areas by the subsoil drainage method at Ponce Playa were
authorized by the Federal Emergency Administration of Public
Works under the National Industrial Recovery Act.
   Local cooperation.--In determining the work to be undertaken,
the approval of the Governor of Puerto Rico is required. All work
is being done in cooperation with the insular authorities.
   Operations and results during fiscal year.-Dredging with the
United States Engineer Department dredge Captain Huston in San
Juan Harbor, to reclaim the swamp area contained in Tras Talleres
District, was commenced on January 9, 1934, and was in progress
at the close of the fiscal year. Filling of this area was about 60
percent completed.
   The costs for the year were $149,504.23, all for new work. The
total expenditures were $143,821.03.
   Condition at end of fiscal year.-The project is about 30 percent
completed, based on the funds available. There remains to be done
                    RIVERS AND IHARBORS-PUERTO RICO DISTRICT                                                   1423
to complete the project, completion of the reclamation, by dredging,
of Tras Talleres area; reclamation, by dredging, adjacent to San
Juan Harbor of malarial areas at Miraflores Island, Puerto de Tierra,
and Isla Grande; reclamation, by dredging, of an area adjacent to
Ponce Harbor, and reclamation, by subsoil drainage, of swamp areas
in Ponce Playa and Salinas, P. R.
   The total cost for the year was $149,504.23, all for new work.
The total expenditures were $143,821.03.
   Proposed operations.-It is proposed to apply the funds unex-
pended, including accounts receivable on June 30, 1934, from allot-
ment under the National Industrial Recovery Act, amounting to
$360,117.59, as follows:
Accounts payable June 30, 1934             _________________----_______ $47, 360. 85
New work:
    (a) Dredging with Government plant and hired labor, reclaim-
           ing malarial swamp areas at the following localities:
        1. San Juan Harbor, Tras Talleres District (July and Au-
             gust 1934)       ---------------------------                 45, 756. 74
        2. San Juan Harbor, Miraflores Island (August 1934) ...            9, 900. 00
        3. San Juan Harbor, Puerto de Tierra District (Septem-
              ber 1934) --------------------                           _  20, 700. 00
        4. San Juan Harbor, Isla Grande (October 1934 to Febru-
             ary 1935), to provide an airplane field-------------99, 900. 00
        5. To provide for a second airplane field probably at Ponce,
              P. R. (February to June 1935) -- __--_--        __    ____ 100, 000.00
    (b) Reclamation of malarial swamp areas by subsoil drainage:
        1. Ponce Playa (July 1934 to May 1935) -___________               33, 000.00
        2. Salinas, P. R. (period between September 1934 and
              June 1935) ------------------------------------              3, 500. 00

                         Total for all work___------                            ________ 360, 117.59
  It is expected that all work on the project will be completed by
June 30, 1935.
                                             Cost and financial summary

Cost of new work to June 30, 1934___________----_______                                              $149, 504. 23
Cost of maintenance to June 30, 1934_

      Total cost of permanent work to June 30, 1934_...........                                          149, 504. 23
Value of plant, materials, etc., on hand June 30, 1934------------                                        37, 739. 03
      Net total cost to June 30, 19341111                                                                187, 243. 26
Plus accounts receivable June 30, 1934 ._______                              _____________                 3, 938. 62

     Gross total costs to June 30, 1934---------------------                                             191, 181. 88
Minus accounts payable June 30, 1934 ------------------------                                             47, 360. 85
      Net total expenditures------------------------------                                               143, 821. 03
Unexpended balance June 30, 1934--------------------------                                               356, 178. 97
          Total amount appropriated to June 30, 1934                                                     500, 000. 00

          Fiscal year ending June 30                   1930       1931        1932           1933              1934


Cost of new work----------                     ---------------------------------------------                $149, 504. 23
Cost of maintenance----------------------                                -           -       ----

Total expended------------------------------                                             -          --       143, 821. 03

Allotted--------E            ----    -4...                                                                   500,000.00

          91536       ENG 1934--90
1424       REPORT OF             CHIEF OF          ENGINEERS,          U.    S.       ARMY,       1934

Amount allotted from National Industrial Recovery Act approved
  June16, ,133    ---------------------------------------------            $500, 000. 00
Gross amount expended---------------------------$147, 687. 99
Less reimbursements collected ----------------------            3, 866. 96
                                                                            143, 821. 03

      Balance unexpended June 30, 1934------------------____                                              356, 178. 97
Outstanding liabilities June 30, 1934---------------- $55, 644. 97
Amount covered by uncompleted contracts------------     4, 840. 55
                                                                                                           60, 485. 52

     Balance available June 30, 1934------------------------                                              295, 693. 45
Accounts receivable June 30, 1934-------------------------____                                              3, 938. 62

        Unobligated balance available June 30, 1934--------------                                         299, 632. 07

               6. Other projects for which no estimates are submitted

           [Commercial statistics for these projects are given in pt. 2 of report]

                                                         For last    Cost and expenditures to
                                                          full re-         June 30, 1934                   Estimated
                  Name of project                        port see                                          amount re-
                                                         annual '                                           quited:to
                                                          report     New work          Maintenance          complete
                                                           for-

1. Ponce Harbor, P. R.1 2--___          ____-- -   _       1933      3 $99, 126. 95     3 $37, 224. 48        3 $154, 900
                                                                      499,126. 95- _4482,                             800
     Total_   - ---------------------.----         ___------198,            253. 90       37, 224. 48           637, 700

  1 No estimate is submitted as channels are considered adequate for existing commerce. Expended foe
general supervision $112.92, and revoked $4.46 during fiscal year 1934.
  2Modification of local cooperation requirements is recommended in Rivers and Harbors Committer
Document No. 18, 72d Cong., 1st sess.
  3 United States funds.
  4Contributed funds.

Status of reports called for by river and harbor acts and cormittee resolutions


       Locality                Authorization act       Transmitted
                                                       toCongress           Document no.
                                                                            Document                     Recommenda
                                                                                                         Recommenda-
                                                                                                             tion

Arecibo Harbor, P. R_-- .Rivers and Harbors Sept. 12, 1933             House, 214, 73d Cong.             Favorable.
                          Act.Mar. 3, 1925.                                  2d sess.
San Juan Harbor, P. R - Rivers and Harbors ...
                          Committee resolu-
                          tion Dec. 6, 1932.


SURVEYS FOR NAVIGATION, FLOOD CONTROL, POWER,
               AND IRRIGATION
  Existing project.-The existing project provides for making in-
vestigations of those navigable streams and their tributaries whereon
power development appears feasible and practicable, with a view to
the formulation of general plans for the most effective improvement
of such streams for the purposes of navigation and the prosecution
of such improvement in combination with the most efficient develop-
ment of the potential water power, the control of floods, and the
needs of irrigation.
  The River and Harbor Act of January 21, 1927, adopted the project
as laid down in House Document No. 308 Sixty-ninth Congress, first
session, and added the following streams to those listed in that docu-
   SURVEYS          FOR NAVIGATION,                  FLOOD         CONTROL,            POWER,          ETC.        1425

ment: Red River, Yazoo River and tributaries, Pearl River, Alta-
maha River and tributaries, tributaries of the Warrior, Coosa, and
Tombigbee Rivers. The Flood Control Act approved May 15, 1928,
extended the scope of the investigation and surveys so as to include
tributaries of the Mississippi River system, subject to destructive
floods, and laid down certain additional investigations on these
tributaries.
   The estimated cost of the work described in House Document No.
308 is $7,322,400. In addition, the act of May 15, 1928, authorized
the expenditure of $5,000,000 of flood-control funds for the surveys
of the tributaries of the Mississippi River.
   Operations and results during fiscal year.-Work on each of the
surveys involved was inaugurated in the spring of 1928. Valuable
cooperation has been received from other Federal agencies; from
States, county, and municipal engineers; from levee and drainage
districts, hydroelectric companies, railroads, universities, and other
local sources of information. Steam gaging stations, where needed,
have been established mainly in cooperation with the United States
Geological Survey. At the close of the fiscal year 1934, surveys of
173 streams had been completed and reports thereon transmitted to
Congress, and reports on the remaining streams well advanced to
completion.
                                                                                                                                        1,
                                                                                                                                       1,




   Allotment of funds by streams to June 30, 1933, for prosecution                                                          .J '       '   1.




of the studies has been as follows:
                                                                                                                                   y




                                                   Allotted from-
   Engineer district and name of                                               Transmitted        Printed in document
              stream                         River and        Flood-con-       to Congress                 no.
                                            harbor funds      trol funds

Boston, Mass.:
    Androscoggin River.------------             $9, 751.23                    Dec. 2, 1930        H. 646/71/3.
    Kennebec River--......----------             9, 400. 54                   Dec. 4, 1930        H. 658/71/3.
    Kennebunk River--   ....---------               343. 93                   June 18, 1930       H. 481/71/2.
    Machias River------------------              1, 372. 47                   Dec. 2, 1930        H.   642/71/3.
    Merrimack River..------------               18, 599. 02                  ---- do-------       H.   649/71/3.
    Penobscot River---------------              11, 001.61                    ----- do--------    H.   652/71/3.
    Presumpscot River....----------                 412. 53                    ---do __----       H.   645/71/3.
    Saco River----------------------             5, 626. 88                    Dec. 4, 1930       H.   659/71/3.
    St. Croix River------------.....             5, 550. 54                    Dec. 2, 1930       H.   643/71/3.
    Salmon Falls River...---------..             2, 525. 27                    June 19, 1930      H.   483/71/2.
    Union River------------------ -              2, 950. 54                    Dec. 2,1930        H.   648/71/3.
Providence, R. I.:
    Connecticut River_---------                133, 410. 39
    Housatonic River..--...-----------          17, 100. 00                    Feb.    9, 1932    H. 246/72/1.
    Pawcatuck River_------------                    652. 20                    Nov. 26, 1929      R. & H. Com. 49/71/2.
    Pawtucket River......------------            3, 400. 00                    ----do-........ R. & H. Com. 50/71/2.
    Taunton River ..........------                1,000.00                      -- do--------     R. & H. Com. 51/71/2.
                   .....------------
    Thames River-----                           17, 399. 17                    Dec. 2, 1930         H. 644/71/3.
First New York, N. Y.:
    Ausable River..-------------                    797. 06                    June          H.
                                                                                       21,1930         488/71/2.
    Batten Kill_----------- ------               3, 599. 46                    Dec.          H.
                                                                                       15,1930         685/71/3.
    Big Chazy River----------------              6, 087. 38                    June          H.
                                                                                       23,1930         490/71/2.
    Boquet River-------------------              2, 744. 83                    Aug.          R.
                                                                                        9,1929         & H. Com. 48/71/2.
    Hoosic River-_------------------             4, 726. 32                    Dec.          H.
                                                                                       15, 1930        684/71/3.
    Hudson River and tributaries---              2, 877. 77                    Dec.          H.
                                                                                        9, 1931        149/72/1.
    Kinderhook Creek---------..----              3, 981.37                     Dec.          H.
                                                                                        2, 1930        653/71/3.
    Lamoille River...--.-----------             23, 312. 63                    Dec.          H.
                                                                                       10,1931         145/72/1.
    Missisquoi River...-----------               5, 997. 91                    June          H.
                                                                                       27,1930         496/71/2.
    Mohawk River ..------          ------        1,462.93                       Dec.         H.
                                                                                       10,1931         158/72/1.
    Otter Creek--------------------             10, 234. 02                    -_- do ---- - H.        144/72/1.
    Poultney River ....------------              4, 557. 18                    June 19, 1930 H.        485/71/2.
    Rondout Creek and Wallkill                   5, 968. 10                    Dec. 23,1930 H.         704/71/3.
      River.
    Saranac River..........------------...          1,115. 38                _    June 23, 1930        -.
                                                                                                  H. 492/71/2.
    Wappinger Creek . .                .---------- 6, 203. 96             _--..   Apr. 23, 1930   R. & H. Com. 55/71/2.
    Winooski River-----------                      36, 539. 17 .--.-.......       Feb. 26, 1931   H. 785/71/3.
Second New York, N. Y.:
    Raritan River -----------------                 2, 565.10 -----------       _ Dec. 27,1929     R. & H. Com. 53/71/2.
1426        REPORT       OF CHIEF             OF ENGINEERS,                             U.   S.      ARMY,                 1934


                                                 Allotted from-
   Engineer district and name of                                                         Transmitted                 Printed in document
              stream                        River and             Flood-con-             to Congress                          no.
                                           harbor funds.          trol funds
                                                                                    I                            I




Philadelphia, Pa.:
    Delaware River and tributaries_          $77, 228. 56          -------
                                                                         '---^- Oct.               9,1933            H.   179/73/2.
    Lehigh River.------------------           13, 552. 08         ------------- Feb.               9, 1932           H.   245/72/1.
    Mon aup River-----------------             2, 058. 38           - --------
                                                                   --           Dec.               4, 1930           H.   660/71/3.
    Neshaminy Creek....-----------             1, 599. 61            -- ------
                                                                    ---         May               24, 1930           H.   429/71/2.
    Neversink River----------.---              3,123.46                         Dec.               9, 1931           H.   147/72/1.
    Perikomen Creek........---------           2, 407. 82                       June              19, 1930           H.   482/71/2.
                                                                  -------------
    Shohola Creek.....------------             1, 875. 06                       Dec.              10, 1931           H.   155/72/1.
                    ..........------
    Tohickon Creek-----                           926. 85         ----------'   June              19,1930            H.   486/71/2.
Baltimore, Md.:
    Susquehanna River.....--------           232, 203. 81 .                             ................
Washington, D. C.:
    Occoquan Creek ..------------            210, 903. 71                                Apr. 22, 1932               H. 101/73/1.
    P tomac River...-------------.
    Pamunkey River....-----------              9, 000. 00                                Jan.   9,1930               R. & H. Com. 54/71/2.
    Patuxent River..--------------             2, 900. 00     --- '-------               ----
                                                                                           _do-     ----             HI. 463/71/2.
    Rappahannock River-----------             30, 500. 00                                Sept. 26, 1933              H. 186/73/2.
Norfolk, Va.:
    James River-------------------           108, 107. 08                               Aug. 23,1933                 H. 192/73/2.
    Meherrin River-----------------            5,131. 84                                June 2, 1930                 H. 446/71/2.
    Roanoke-Staunton Rivers-------           180, 750. 32 -
Wilmington, N. C.:
    Cape Fear River-..-----------             58, 901.43                                Sept. 27, 1933 H. 193/73/2.
    Neuse River...---------------             32, 278. 57                               June 1, 1932 H. 500/72/2.
    Tar River-----------------------           4, 520. 00                               Dec. 16,1931 H. 187/72/1.
Charleston, S. C.:
    Santee River..-------------              109, 497. 68                               Mar. 3,1933                  H. 96/73/1.
   Yadkin-Peedee Rivers-..---------          115;805. 45                                May 16, 1933                 H. 68/73/1.
Savannah, Ga.:
    Altamaha River and tributaries_          140, 902. 18
    St. Marys River ___------------               793. 23
    Satilla River.--------------               5, 842. 55                                Dec. 27,1929                R. & H. Com. 52/71/2.
    Savannah River--......----------         124, 140. 00
Jacksonville, Fla.:
    Suwannee River ....----------      .       9, 001. 22
    Withlacoochee River..----------           15, 476. 15 -
Montgomery, Ala.:
    Apalachicola River....----------         246, 631.44      --
    Mobile River, including Coosa            258,305.69       ----. .......
      River and tributaries.
Mobile, Ala.:
    Pearl River ...---------------.           18, 590. 86                      S-- June             2, 1930          H. 445/71/2.
    Tombigbee River and tribu-                67, 950. 00
      taries.                                                                            Oct. 27, 1932               H. 56/73/1.
    Warrior River and tributaries---            877.71
                                             185,
New Orleans, La.:
    Amite River..---------------               1,942. 31                                June 18, 1930                H. 480/71/2.
    Bayou Nezpique----------------
    Bayou Teche.-------------------
                                              17, 798.95
                                              19, 670. 60    ----------
                                                            -------------
                                                              I                     _ Dec.          9, 1932          H. 75/73/1.
    Calcasieu River ------------              26, 994. 26
    Chefuncte River ..------------                876. 28                  June 19, 1930                             H. 487/71/2.     ------...
    Tangipahoa River.....----------               932. 82    ------------- ----
                                                                           _-   do- .                                H. 484/71/2.
                                                            -------------  Aug. 9,1929                               H. 110/71/1.
    Tickfaw River....-----------------            817.88
Galveston, Tex.:
                       ...
    Guadalupe River-------        ---         65, 578. 23
Vicksburg, Miss.:
    Big Black River----------------           13,-000. 00          $21, 872.   75        Dec.       9, 1932          H. 72/73/1.
    Ouachita River...--------.----            43, 000. 00           24, 000.   00        Dec.       7, 1933          H. 196/73/2.
    Red River----------------------           64, 000. 00          625, 542.   23
    Yazoo River and tributaries----                                138, 239.   52        Nov. 17, 1933               H. 198/73/2.
Memphis, Tenn.:
    Arkansas River and tributaries-           25, 344. 04          428, 085. 50
    Fourche La Fave River .-------                820. 77            7, 000. 00
   Grand River---.--------------               4, 060. 33           27, 000. 00         -- -- - - - - -
   Hickman, Ky. (flood control)..-                                                       Jan. 28,1931                H. 729/71/3.
   Illinois River---.--------------            3, 865.51             7, 000. 00          Dec. 10,1931
   Mayfield Creek-------------- ---                                  1, 000. 00          Dec. 16,1931                H. 156/72/1.
   Mississippi River below Cape                                                                                      H. 188/72/1.
      Girardeau, Mo.
   Petit Jean River ..-----------                758. 51             6, 000. 00         ----- - - - -
   Poteau River.....--------------               677. 81             5, 000. 00
     t. Francis River......--.---.                                                      IAug. 10, 1929               H. 159/71/2.
    St. Francis River (back-water              5, 001.21                                 May 24, 1930                H. 430/71/2.
      area).
    White River- ----------------             19, 471.82           172, 955.93           Mar. 30, 1932               H. 102/73/1.
St. Louis, Mo.:
    Meramec River _____-___-
                       --                     $7, 500. 00           S43,864.79           Dec. 15, 1930               i.   686/71/3.
    Mississippi River ____---- -              23, 000. 00           43,   864.79        __   -_-_   ----   ___
        SURVEYS FOR NAVIGATION,                                     FLOOD          CONTROL,                POWER,         ETC.     1427

                                                            Allotted from-
     Engineer district and name of                                                            Transmitted         Printed in document
                stream                                River and           Flood-con-          to Congress                  no.
                                                    harbor funds          trol funds


Rock Island, Ill.:
    Des Moines River -------------- $5, 000. 00              $1, 800. 00 Dec.                        16,1930      H. 682/71/3.
L Iowa River        _______-.... ___     -__   5, 000. 00             ------------
                                                                           Dec.                      13, 1929     H. 134/71/2.
    Maquoketa River ______..._____________________ _ _                     June                      26, 1933
    Mississippi River__-___ ___-__-            4, 500. 00    43, 311. 34    _-_--
    Rock River_----     -----------------                     3, 000. 00 June                        26,   1933
    Skunk River -- ____________-__            -______________ 2, 500. 00 Dec.                        14,   1931   H. 170/72/1.
    Turkey River .-________-_______          -- ______________             Mar.                       3,   1933   H. 98/73/1.
    Wapsipinicon River        -___________-_____________ ______  -         June                      20,   1933
St. Paul, Minn.:
    Chippewa River------------_               11, 594. 91     3, 635. 00 Dec.                        14, 1931     H. 171/72/1.
    Minnesota River-._______         ___       2, 011. 69     9, 920. 00 --
    Mississippi River:
        Belov Coon Rapids --                  41, 007. 56    30, 170. 04 May                         25, 1933     H. 66/73/1.
    St. Croix River-----------------                          9, 519. 17        3, 605. 33   June 9,1930          H. 462/71/2.
    Wisconsin River-------------__                            4, 296. 67        3, 220. 00   Jan. 17, 1930        H. 259/71/2.
Kansas City, Mo.:
    Bad River_---------------_                                2, 500. 00       10, 500. 00   June 26,1933         H.189/73/2.
    White River-_________________                             3, 500. 00       16, 000. 00                        H. 189/73/2.
    Big Sioux River___----___--                 __            4, 000. 00        8, 000. 00   Dec. 16,1931         H. 189/72/1.
    Little Sioux River -------------                          3, 500. 00        4, 500. 00
    Cannon Ball River____ ________                            2, 000. 00        9, 500. 00
    Grand River, S. Dak -.-- --...                            2, 000. 00        9, 500. 00    Oct.   27,1932      H. 76/73/1.
    Moreau River              _____________                   2, 500. 00        9, 500. 00                                   °
    Cheyenne River.- -                       _                9, 000. 00       55, 500. 00    Dec. 16, 1931       H. 190/72/1.
    Gallatin River __________                    __           2, 000. 00        5, 000. 00
    Jefferson River            -__________---_                2, 500. 00        7, 000. 00    ----....
                                                                                                  do.......       H. 193/72/1.
    Madison River-----                                        4, 500. 00        5, 000. 00
    Gasconade River -____________                             4, 500. 00        7, 000. 00   ---- do.             H.   192/72/1.
    Grand River, Mo--------------                           17, 000. 00        24, 000. 00    Jan. 26, 1932       H.   236/72/1.
    James River--________________                             9, 000. 00       33, 400. 00    Mar. 24, 1933       H.   83/73/1.
    Kansas River-- -..------                   -_           39, 143. 88      143, 000. 00     Dec. 7, 1933        H.   195/73/2.
    Little Missouri River _..---                              2, 500. 00       14, 000. 00    May 10, 1933        H.   64/73/1.
    Marias River_-------------_                               4, 500. 00        5, 500. 00    Dec. 16,1931        H.   191/72/1.
    Milk River--------------------                            3, 000. 00       35, 500. 00    Oct. 27,1932        H.   88/73/1.
    Missouri River__-----_____                         -_ 38, 919. 58        395, 872. 02     Oct.    3, 1933     H.   238/73/2.
    Musselshell River---------------                          3, 000. 00        7, 100. 00    Dec. 10,1931        H.   146/72/1.
    Niobrara River_-                    ---                   4, 500. 00       19, 500. 00    Oct. 27, 1932       H.   90/73/1.
    Osage River_________________                            11, 000. 00        56, 500. 00    Dec. 23,1932        H.   91/73/1.
    Platte River...-----------------                        20, 000. 00      227, 805. 50     Nov. 3,1933         H.   197/73/2.
    Yellowstone River--------------                         14, 000. 00       193, 000. 00    Feb. 10,1934        H.   256/73/2.
Nashville, Tenn.:
    Cumberland River...------------- 141, 000. 00                            205, 000. 00     Apr. 28,1933        H. 38/73/1.
Chattanooga, Tenn.:
    Tennessee River-----......._                           313, 315. 00         2, 500. 00    Mar. 24, 1930       H. 328/71/2.
Pittsburgh, Pa.:
    Allegheny River -__-__-____--                             8, 500. 00       65, 685. 60   ---------------
    Beaver River__-____________--                             2, 000. 00       39, 818.57    -------------
    Monongahela River---         ________          _        15, 900. 00        52, 883. 37   --
    Ohio River.--------------------                           2, 600. 00       54, 031. 72   ---------------
Huntington, W. Va.:
    Big Sandy River--__---________                            5, 268. 94       12, 065. 61
    Guyandot River.--_______ __                               3, 621. 70           442. 13    Dec. 9, 1931        H. 150/72/1.
    Hocking River------- ...          .     ____ .         _____          -___ 4, 752. 09     Feb. 11, 1933       H. 82/73/1.
    Kanawha River-               ----....      -----. 47, 190. 49              30, 819. 21
    Little Kanawha River__-.--                   -__          6, 671. 68        6, 459. 48    Feb. 2,1931         H. 732/71/3.
    Ohio River___...----            .....                .__.---------------   14, 947. 69   ---------------
    Twelve Pole Creek----___________                      __________            3, 940. 52    June 20, 1933
Zanesville, Ohio:
    Muskingum River--------------                             7, 702. 29       17, 511. 99   ---------------
Cincinnati, Ohio:
    Ohio River (Upper Mississippi
      Valley Division) ..------------    _           .      _       ____        2, 483. 31
    Kentucky River--.....-------------                      24, 400. 00      104, 889. 75      Oct. 27, 1932      H. 85/73/1.
    Licking River__--  ....         -           _ --        26, 900. 00        13, 956. 93    June 30, 1932       H. 86/73/1.
    Little Miami River-----___                          -____.__       -_____.__9, 982. 58   ---
    Miami River _----                                       11, 700. 00         8, 110. 52     Dec. 16,1930       H. 681/71/3.
    Ohio River---------------------                              500. 00       10, 848. 49   --
    Scioto River----------------                                               29,029.46     ---------------
Louisville, Ky.:
    Green,    Barren, and Rough
      Rivers ---------------------
                 .                                          57, 000. 00        71, 500. 00    Oct. 27,     1932   H. 81/73/1.
    Ohio River    ...........
            OhoRvr-----            ___ -----. .........
                                                      -------------22,09.    242, 094. 02    --   -0
    Salt River_ ________-----___                                      ------------
                                                              1, 200. 00                      June 12,     1930   H. 477/71/2.
    Tradewater River                        -___-....
                                                  -           2, 200. 00 ------------
                                                           -____                              June 19,     1930   H. 479/71/2.
    Wabash River-..... -                 - --               33, 600. 00      305, 602. 87     Feb. 17,     1933   H. 100/73/1.
1428        REPORT          OF      CHIEF OF ENGINEERS,                                                               U.   S. ARMY,            1934


                                                          Allotted from-
  Engineer district and name of                                                                                        Transmitted       Printed in document
              stream                            River and                     Flood-con-                               to Congress               no.
                                               harbor funds                   trol funds
                                             i------

Duluth, Minn.:
   Amnicon River- ...........             $4, 000. 00                                                                  Dec. 10,1931      H. 164/72/1.
   Bad River_--             -              8, 057. 87                                                                  Dec. 9,1932       H. 71/73/1.
   Baptism River-__------                  2, 600. 00                   --------------


   M anitou River----------------..         2, 480. 00                       ---                             -- .---   Feb. 15,1932      H.   250/72/1.
   Beaver Bay River .... ____....           2, 480. 00
   Big Fork River ........
   Brule River, Minn- -----------.
                                          14, 200. 00
                                            4, 648. 55
                                                                        -- ----..
                                                                        --                 -        --       -- .      Jan. 14,.1932
                                                                                                                       Oct. 27,1932
                                                                                                                                         H.
                                                                                                                                         H.
                                                                                                                                              226/72/1.
                                                                                                                                              73/73/1.
   Brule River, Wis---.........
   Carp River -...---..--........
                                            3,860.00
                                            2, 500. 00
                                                                        --
                                                                        --




                                                                        --    ----
                                                                              --




                                                                             ---  --...-       --        -     -       Dec. 9, 1932
                                                                                                                       Jan. 14,1932
                                                                                                                       Dec. 9,1931
                                                                                                                                         H.
                                                                                                                                         H.
                                                                                                                                              74/73/1.
                                                                                                                                              227/72/1.
   Cascade River .__ .__.. .___             2, 280. 00                  --
                                                                        --    --  --..                                 Oct. 27,1932
                                                                                                                                         H.
                                                                                                                                         H.
                                                                                                                                              142/72/1.
                                                                                                                                              77/73/1.
   Devil Track River ______ ____
   Gooseberry River.______________
   Kawishiwi River...............
                                            2, 280.00
                                            1,980.00
                                            7, 379. 99
                                                                        ---..---. --
                                                                                  -.-_                                 May 17, 1932
                                                                                                                       Jan. 26,1932
                                                                                                                       May 4,1933
                                                                                                                                         H.
                                                                                                                                         H.
                                                                                                                                         H.
                                                                                                                                              79/73/1.
                                                                                                                                              238/72/1.
                                                                                                                                              65/73/1.
   Little Fork River..-.-........         11, 900. 00
   Montreal River .........
   Pigeon River............
                                    _____   4, 900. 00
                                            8, 521.16
                                                                        --------                                       Oct. 27,1932
                                                                                                                      ..--do------
                                                                                                                       Mar. 3,1933
                                                                                                                                         H.
                                                                                                                                         H.
                                                                                                                                         H.
                                                                                                                                              87/73/1.
                                                                                                                                              89/73/1.
                                                                                                                                              92/73/1.
   Poplar River....--------------           3, 180.00
   Temperance River .............           2, 780. 00                                                                }Apr. 30, 1932     H.   93/73/1.
   Rainy River............                38, 399. 55
   St. Louis River ________.____          14, 244. 63     -- 7, 375.58
                                                                                                                       Jan. 14,1933 H. 95/73/1.
                                                                        --------
                                                                        --        --   -       --        -        -

   Sturgeon River ..__._____ __            10, 165. 83                                                                 Dec. 9,1932 H. 97/73/1.
   Vermilion River....--..........          8, 188.81
Milwaukee, Wis.:                                                        --------                                       --. do    ..----- H. 99/73/1.
    Grand River, Mich_____________
    Kalamazoo River............
                                          32, 447. 27
                                          20, 042. 36                   --
                                                                        --------
                                                                          ------
                                                                                                                       Oct.
                                                                                                                      Jan.
                                                                                                                              27,1932
                                                                                                                              14, 1932
                                                                                                                                         H. 80/73/1.
                                                                                                                                         H.   224/72/1.
   Manistee River_____.. __________ 20, 766. 53
                                                                        --
                                                                        --------                                      Dec.     9, 1931   H.   159/72/1.

                                                                          ------
                                                                        ------
   Manistique River_ _______ __             8, 176.10                                                                 Dec.    19, 1929   R.   & H. Com. 56/71/2.
   Menominee River ...---------
   Muskegon River.....-----.....
                                          27, 015. 35
                                          30, 175. 10                         --                                       Dec.
                                                                                                                       Dec.
                                                                                                                               9,1931
                                                                                                                              10,1931.
                                                                                                                                         H.
                                                                                                                                         H.
                                                                                                                                              141/72/1.
                                                                                                                                              143/72/1.
    Oconto River ----       .......         9, 960. 39                                                                June    23,1930    H. 489/71/2.
   Peshtigo River ..--..........            1,978. 50                                                                  -do
                                                                                                                      -.         _---    H. 491/71/2.
   St. Joseph River...............         34, 263. 91 ---- - - -- -                                                   May    23, 1932   H. 94/73/1.
   Wolf River-.....................        32, 174. 49                                                                 Mar.   15, 1932   H. 276/72/1.
Chicago, Ill.:                                                   $273•09
    Fox River......................         1, 809. 36                                     $273.             09        Apr.   26,1930    H.   410/71/2.
   Illinois River ...................      10, 237. 22        9,9, 351.
                                                                   351.
                                                               6, 20O. 0
                                                                        33
                                                                        33                                             Dec.   16,1931    H.   182/72/1.
    Kankakee River- -------------          11, 261. 20                                 6, 200.               00        Feb.   26,1931    H.   784/71/3.
    Sangamon River...............          19, 536. 03                                 7, 375.               58        Dec.   16,1931    H.   186/72/1.
San Francisco, Calif.:
   Eel River ..      _______________       18, 995. 00    --....                                                       Aug. 23, 1933     H. 194/73/2.
    Klamath River___                        9, 381.18 --_______.         .                                             Oct. 16,1933      H. 181/73/2.
    Mad River-                             13, 000. 00 --...        ...                                                Aug. 23, 1933     H. 188/73/2.
Sacramento, Calif.:
    Kern River_...._____         ________  13, 700. 00
    Sacramento River..
                     ____________                      115, 382.92
    San Joaquin River______________                     67, 168. 27                                                   JFeb. 27,19311 H. 791/71/3.
    Sacramento-San Joaquin-Kern                                              -.                               .        June 27,19332 H. 191/73/2.
      Rivers (Salt-Water Barrier).                     126, 000. 00
Portland, Oreg.:
    Columbia (lower) River- ......                     256, 132. 49                                                    Mar.   29, 1932   H.   103/73/1.
    Cowlitz River_...____________                       16, 460. 20                                                    Dec.   11, 1930   H.   666/71/3.
   John Day River ..........                            57, 699. 93                                                    May    24,1932    H.   84/73/1.
   Lewis River-__                                       11, 811. 05                                                    Dec.   16, 1930   H.   680/71/3.
    Snake River ____                                    51,302.11                                                      Dec.   16,1933    H.   190/73/2.
   Willamette River- -............                      26, 182. 43                                                    Feb.   27, 1932   H.   263/72/1.
Seattle, Wash.:
    Chehalis River.................                      9, 520.   96                                                  Dec. 9,1931       H. 148/72/1.
    Columbia (upper) River-......                      392, 414.   53                                                  Mar. 29, 1932     H. 103/73/1.
    Puyallup River-------                               16, 049.   68                                                  Dec. 10, 1931_    H. 153/72/1.
    Skagit River ...................                    79, 159.   65                                                  Sept. 14, 1933    H. 187/73/2.
    Snohomish River -----------                         64, 700.   19                                                  Feb. 15,1934      H. 258/73/2.
    Stilaguamish River.............                     20, 641.   76                                                  Dec. 4, 1930      H. 657/71/3.
       Total            ......-------------------- 5, 774, 997. 07           4, 243, 455.86

  1 Partial report.
  2 Final report.
                       CALIFORNIA       DEBRIS COMMISSION                        1429
                CALIFORNIA DEBRIS COMMISSION
   This Commission, consisting of three officers of the Corps of Engi-
neers, was created by the act of Congress approved March 1, 1893
(27 Stat. L., p. 507), as amended by the act of February 27, 1907 (34
Stat. L., p. 1001), and has jurisdiction and duties extending over the
drainage area of the Sacramento and San Joaquin Rivers, compris-
ing the great central valley of California and extending from the
crest of the Sierra Nevada on the east to that of the Coast Range
on the west and from Mount Shasta and the Pit River Basin on the
north to the Tehachapi Mountains on the south. These rivers empty
into the head of Suisun Bay, ultimately discharging into the Pacific
Ocean through the connecting bays and straits and the Golden Gate.
   The duties prescribed by the act creating the Commission are:
   First. To regulate hydraulic mining in such a way as to permit
its resumption and continuance under such restrictions as to prevent
the resulting debris from being carried into navigable waters or
otherwise causing damage.
   Second. To study and report upon general hydraulic and hydrau-
lic-mining conditions and matters affecting or affected by them and
to make surveys, mature and adopt plans for the purpose of improv-
ing the navigability, deepening the channels, and protecting the
banks of the rivers, and affording relief from flood damages.
   While the Commission was to " adopt " plans as a result of its
study, the act creating it did not provide means for directly carrying
them out. Congress, however, has from time to time adopted certain
of the plans formulated by the Commission and charged it with their
execution, under the direction of the Secretary of War and the super-
vision of the Chief of Engineers.
   During the past year until February 7, 1934, the Commission con-
sisted of Lt. Col. Thomas M. Robins, Corps of Engineers (presi-
dent); Lt. Col. Henry A. Finch, Corps of Engineers; and Capt.
J. G. Drinkwater, Corps of Engineers (secretary). Since Febru-
ary 7, 1934, the Commission consisted of Lt. Col. Thomas M. Robins,
Corps of Engineers (president); Maj. E. S. J. Irvine, Corps of
Engineers; and Capt. J. G. Drinkwater, Corps of Engineers
 (secretary). The secretary has immediate supervision of the work
of the Commission.
                                    IMPROVEMENT'S

                                      Page                                        Page
1. Regulation of hydraulic min-               3. Control of floods, removal of
     ing and preparation of                       debris, and improvement of
                                      1429
      plans___________________-------------        Sacramento River, Calif___     1435
2. Treatment of the Yuba River
     debris situation-restrain-
     ing barriers______________ 1431

  1. REGULATION OF HYDRAULIC MINING AND PREPARATION OF
                          PLANS

  Location.-Operationsare largely limited to the territory between
Mount Lassen on the north and the Yosemite Valley on the south,
on the western watershed of the Sierra Nevada. (See U. S. Geo-
logical Survey sheets for the area, 25 in number.)
1430   REPORT   OF CHIEF OF ENGINEERS, U.      S. ARMVY,   1934


   Existing project.-This provides for regulating hydraulic-mining
operations, planning the improvement of conditions upon the Sacra-
mento and San Joaquin Rivers and their tributaries affected by such
operations, and the preparation of plans to enable hydraulic mining
to be resumed. On application by prospective miners, full investi-
gation is made by the Commission, and permits to operate are issued
to those who provide satisfactory debris-restraining basins'by con-
struction of suitable damrns where necessary. The estimate of cost
for this work, revised in 1916, is $18,000 per annum. The existing
project was adopted by the act of March 1, 1893, as amended by the
act of February 27, 1907, and the plan of operation is therein speci-
fied. (For latest published map see Annual Report for 1913, p.
3170.)
   Local cooperation.-Mine owners are required to bear all expenses
incurred in complying with the orders of the Commission for regu-
lation of mining and restraint of debris.
   Terminal facilities.-None.
    Operations and results during fiscal year.-Maintenance, by hired
labor: Surveys of 2 debris-storage reservoirs on the Yuba and Bear
Rivers, at a cost of $1,736.41; and 188 hydraulic-mining inspections,
at a cost of $4,781.37, were made.
   Operations of one gold-dredging company under permit, and
somewhat similar operations of other companies, for which permits
are not required, were supervised. The Commission has given con-
sideration to reclamation and flood-control work in cooperation with
State and local interests. Administrative work overlaps that of
improvements nos. 2 and 3 hereunder and that of the Sacramento
engineer district. The cost of these activities was $3,125.88. The
total cost for all activities was $9,643.66. Total expenditures were
$9,143.45.
   Condition at end of fiscal year.-The Commission has received
1,138 applications for licenses for hydraulic mining. Seventy mines
are licensed. Surveys have been made of those portions of the Yuba,
Feather, Bear, and American Rivers containing great deposits of
mining debris. Plans have been made for flood and debris control
in the Sacramento River basin; and flood control in the San Joaquin
River basin. (See nos. 2 and 3 hereunder.)
   Work remaining to be done is, in general, the continuation and
supervision of all the above or similar operations. The total cost of
all work was $536,119.09 for maintenance. The total expenditures
were $536,247.58.
   Proposed operations.-The balance unexpended at the end of the
year, amounting to $10,573.76, will be applied as follows:
   Applications for permission to mine by hydraulic process will be
duly investigated and considered; mines operating under existing
permits will be regulated and there will be the necessary inspections,
preparation, and approval of plans, etc., as during preceding years;
studies, examinations, surveys, and miscellaneous operations will be
continued.
    In order that the work as carried on in preceding years by the
Commission may be continued and that the demands of the State and
general public requiring consultation with the Commission may be
met and the results of the Commission's studies made available
                                CALIFORNIA DEBRIS COMMISSION                                                                  1431
thereto, the additional sum of $10,000 can be profitably expended
during the fiscal year 1936..
                                       Cost and financial summary
Cost of new work to June 30, 1934    _____--------------- -                                                     -----------
Cost of maintenance to June 30, 1934__----------------                                                             $536,119. 09

Total cost of permanent work to June 30, 1934                                                                       536, 119. 09
Value of plant, materials, etc., on hand June 30, 1934 ___________                                                       328. 52

      Net total cost to June 30, 1934------------------------                                                       536, 447. 61
Plus accounts receivable June 30, 1934 --------    ----------                                                             86. 17

      Gross total costs to June 30, 1934-----------------------                                                     536, 533. 78
Minus accounts payable June 30, 1934---------------------------                                                          286. 20

      Net total expenditures_______-------                            -----------                                   536, 247. 58
Unexpended balance June 30, 1934                                                                        -----         0, 573. 76
                                                                                                                     1-------------------

                                                     --
         Total amount appropriated to June 30, 1934___________                                                      546, 821. 34

         Fiscal year ending June 30                     1930            1931               1932             1933             1934


Cost of new work ..                     I ------
                                ---------------                                --         -------         -----------            -----
Cost of maintenance         _     _------------------ $13, 449.76   $18, 772. 33        $17, 387. 93      $6, 996. 47       $9, 643. 66
Total expended---------------------                  14, 991. 65     16, 085. 30         19, 535. 70       6, 676. 99        9, 143. 45
Allotted.............----------------------------    18, 000. 00     17, 350. 00 ------------              6, 666. 64       19, 550. 49


Balance unexpended July 1, 1933 ____$166.                                                                                           72
Amount allotted from War Department Appropriation Act
  approved Apr. 26, 1934--------------------------- $10, 000. 00
Amount allotted from War Department Appropriation Act
  approved July 14, 1932_______________----------     2, 933. 28
Amount allotted from War Department Appropriation Act
  approved Mar. 4, 1933- ---------------------------   6, 900. 00
                                                                                                                        19, 833.28
     Amount to be accounted for ________-                      -
                                                       -________-  20, 000. 00
Deductions on account of revocation of impounded balances---------     282. 79

         Net amount to be accounted for                                                                                     717. 21
                                                                                                                        1-----------------------9,
Gross amount expended-- ._- ------                                                  -             $11, 362.54
Less reimbursements collected---___-__                                    -______- -                   2, 219. 09
                                                                                                                         9, 143. 45
      Balance unexpended June 30, 1934_ __----______-_____-                                                         10, 573.76
Outstanding liabilities June 30, 1934_..._________--____-____                                                           365. 90
     Balance available June 30, 1934                                .__.      _______-____ 10, 207. 86
Accounts receivable June 30, 1934_.__..                              _____-....________-  --    86. 17
         Unobligated balance available June 30, 1934---------------                                                     10, 294. 03
Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance    -
                                  __- -
                                          1_   - -
                                          __ _____   - -     -   -
                                                          ________ 10, 000. 00
      2. TREATMENT OF THE YUBA RIVER DEBRIS                                                            SITUATION-
                     RESTRAINING BARRIERS
Location.-The works are located on the Yuba River between
Marysville and the place where the river emerges from the foot-
   SExclusive of available funds.
1432        REPORT          OF CHIEF OF             ENGINEERS,       U.    S.   ARM1VY,      1934

hills, near Hammonton, some 10 miles easterly from Marysville,
and about 9 miles below the Narrows. (See U. S. Geological Survey
" Topographic Map of the Sacramento Valley, Calif.")
   Existing project.-This provides for storage of mining debris
within the bed of the Yuba River by means of a debris barrier, and
by the restraint of the flow channel to narrow limits by means of
training walls and other regulation works. The object of storing this
debris in the Yuba River-a nonnavigable stream-is to keep it from
passing into the Sacramento and Feather Rivers to the detriment of
navigation therein. The variation in water levels due to floods is
about 12 feet. The estimate of cost for new work made in 1900 is
$800,000, one half of which was appropriated by the State of Cali-
fornia. The latest (1922) approved estimate for annual cost of
maintenance is $30,000. (For details of this project in its original
form see Annual Report, 1917, page 1810, " Previous projects.")
   The existing project was adopted in a rather indefinite form by the
River and Harbor Act of June 3, 1896, and in its more definite form
by River and Harbor Act of June 13, 1902. (H. Doc. No. 431, 56th
Cong., 1st sess.)  (For latest published map see United States Geo-
logical Survey " Topographic Map of the Sacramento Valley,
Calif.")
   Local cooperation. Fully complied with.
   Terminal facilities.-None.
   Operations and results during fiscal year.-Maintenance: Hired
labor was used to remove 1,360 snags and other obstructions; clear 21
acres of brush from the river channel and banks, blast 36,400 square
feet of hardpan reefs; and repair seven retards, at a cost of $4,710.14.
Four retards, four bankheads, and an embankment across overflow
channels were constructed, under contract, along the northerly bank
of the Yuba River, about one-half mile east of Marysville, at a
cost of $9,494.50. Total costs were $14,204.64; total expenditures,
$14,909.18, of which $3,373.39 was United States funds and $11,535.79
contributed funds.
   Condition at end of fiscal year.--The existing project is 99 percent
completed. Three training walls, having a total length of 85,100 feet
and providing two 500-foot channels, have been built, partly by gold-
dredging companies and partly by the United States. A cut was
made through Daguerre Point and a concrete spillway constructed
therein. The channel between Marysville and the training walls has
been cleared of obstructions, current retards have been installed, and
old sand channels have been blocked. The result has been to hold
millions of yards of mining debris in the Yuba River which would
otherwise have passed into the navigable channels of the Feather and
Sacramento Rivers.
   The total costs were as follows:

                                                                    New work        Maintenance       Total


United States funds__-----------.-.-.-.-.-  --__--..-               $361,482.28      $127, 552. 70   $489, 034. 98
Contributed funds_____      ... ______.... .....               .     361, 776. 74     127, 259. 05    489, 035. 79
      Total_       .---.-     ___-..       _________-.__. ..   ..    723, 259. 02     254, 811. 75    978, 070. 77
                              CALIFORNIA DEBRIS                COMMISSION                                  1433

  The total expenditures have been $978,775.31 of which $489,739.52
were United States funds and $489,035.79 contributed funds.
   Proposed operations.--The balance unexpended at the end of the
year, amounting to $8,464.21, together with a contribution of $2,-
239.52 to be made by the State of California, will be used as needed,
between July and December, 1934, to clear the channel between
Marysville and Daguerre Point by removal of snags, brush, and
trees, and blasting of hardpan; to confine the river to this channel
by damming the heads of old channels, to repair, reinforce, and
protect the Daguerre Point Dam; and for bank protection on both
banks from 4 to 9 miles above Marysville.
   The additional sum of $15,000 (together with an equal contribu-
tion from the State of California), can be profitably expended as
needed during the fiscal year 1936, between July and December 1935,
on work similar to the above. The work is necessary to prevent
debris entering the Feather and Sacramento Rivers.
                                     Cost and financial summary
                                           UNITED    STATES    FUNDS


Cost of new work to June 30, 1934_______                                             $361, 482. 28
Cost of maintenance to June 30, 1934_                         _---------------------127, 552. 70

      Total cost of permanent work to June 30, 1934-           --                                   489, 034. 98
Value of plant, materials, etc., on hand June 30, 1934------------                                       704. 54

     Net total cost to June 30, 1934--------------------------                                      489, 739. 52
Unexpended balance June 30, 1934 ______----       -------                                             5, 000. 00

           Total amount appropriated to June 30, 1934------__ ---                                   494, 739. 52

           Fiscal year ending June 30               1930        1931          1932          1933           1934


Cost of new work                     ......- $.-    .---                --             --$               ---
Cost of maintenance _______________________$26, 638. 86       $8, 862. 18 $12, 664. 66 $10, 944. 03       $2, 668.
                                                                                                                 85
Total expended--------            ------        26, 669. 18    8, 862. 18   12, 664. 66   10, 944. 03      3, 373. 39
Allotted                                                      17, 500.00                  14, 762. 81      2, 476. 71


Balance unexpended July 1, 1933_------------------- ---------     $5, 896. 68
Amount allotted from War Department Appropriation Act approved
April 26, 1934                                                     5, 000. 00
                                                              _------------------------------__

     Amount to be accounted for--------------------    ----- 101,896. 68
Deductions on account of--
   Revocation of allotment-----------------------   $2, 391. 57
   Revocation of impounded balance-------------------131. 72
                                                                2, 523. 29

      Net amount to be accounted for-------------------------                                           8, 373. 39
Gross amount expended-------------                                                                      3, 373. 39

           Balance unexpended June 30, 1934----------------5,                                             000. 00
Amount that can be profitably expended in fiscal year ending June
                            ,
30, 1936, for maintenance _                                      15, 000. 00

   1Exclusive of available funds.
1434           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

                                                 CONTRIBUTED           FUNDS

Cost of new work to June 30, 1934_----____   ---- _____  --  ___ $361, 776. 74
Cost of maintenance to June 30, 1934--------     ---------------- 127, 259. 05

     Total cost of permanent work to June 30, 1934.---- -____- 489,035. 79
Unexpended balance June 30, 1934 _____-____
                                         -- __-________-         3, 464. 21
          Total amount contributed to June 30, 1934 ____                                    ___________                 492, 500. 00

          Fiscal year ending June 30                       1930            1931            1932                 1933            1934

"%.C
  o     f,.         k...1.

Cost of maintenance_.          ..              $26, 669. 18
                              ______............                        $8, 862. 18      $9, 913. 60        828. 96
                                                                                                          $4,                    535. 79
                                                                                                                              $11,
Total expended-----------------------                    26, 669. 18     8, 862. 18       9, 913. 60          4, 828. 96       11, 535. 79
Contributed. __ _____             ______________          2, 773. 92     4, 000. 00      13, 500. 00          15, 000.
                                                                                                                     00 _____

                                 ----------------------------
Balance unexpended July 1, 1933_____________                                                                            $15, 000. 00
Gross amount expended________________________________________                                                            11, 535. 79
Balance unexpended June 30, 1934-----------------------------                                                                3,464. 21
Amount that can be profitably expended in fiscal year ending June
30, 1936, for maintenance 1__________________________________                                                              15, 000. 00
              CONSOLIDATED COST AND FINANCIAL SUMMARY FOR YUBA RIVER, CALIF
Cost of new work to June 30, 1934_________________________                                                             $723, 259. 02
Cost of maintenance to June 30, 1934____________________________                                                        254, 811. 75
      Total cost of permanent work to June 30, 1934___________                                                          978, 070. 77
Value of plant, materials, etc., on hand June 30, 1934 ______.___                                                            704. 54

          Net total cost to June 30, 1934____.____-_______._______                                                      978, 775. 31
Net total expenditures________-____________-      -                                                                     978, 775. 31
Unexpended balance June 301,1934--__------------------____                                                                8,464. 21

          Total amount appropriated and contributed to June 30, 1934_                                                   987, 239. 52

          Fiscal year ending June 30                        1930           1931            1932                 1933            1934

Cost of new work   -----------------------------------------------------------------                                             --
Cost of maintenance------------------__               $53, 308. 04 $17, 724. 36         $22, 578. 26      $15, 772. 99        $14, 204. 64
Total expended----__--------------_                      53, 338. 36    17, 724. 36      22, 578. 26          15, 772. 99      14, 909. 18
Allotted and contributed----------------                  2, 773. 92    21, 500. 00      13, 500. 00          29, 762. 81       2, 476. 71

Balance unexpended July 1, 1933-------       ______-______      ___ $20, 896. 68
Amount allotted from War Department Appropriation Act approved
Apr. 26, 1934----------------       ----------      ----------       5, 000. 00
     Amount to be accounted for---------------------------25,                                                                   896. 68
Deductions :
   Revocation of allotment-_____________________                                                  $2,391. 57
   Revocation of impounded balance-____---------                                                     131. 72
                                                                                                                             2, 523.29
      Net amount to be accounted for __________-----__--23, 373.39
Gross amount expended---   --- -------                   14, 909.18
          Balance unexpended June 30, 1934-- ----                                         __              __--8,               464.21
Amount that can be profitably expended in fiscal year ending June
   30, 1936, for maintenance _--                               --                 ---                  ----                 30, 000. 00
   1   Excusive of available funds.
                  CALIFORNIA   DEBRIS COMMISSION                 1435
3. CONTROL OF FLOODS, REMOVAL OF DEBRIS, AND IMPROVEMENT
                OF SACRAMENTO RIVER, CALIF.

   Location.-Forlocation of Sacramento River see page 1286.
   Previous projects.-The original project was adopted by the River
and Harbor Act of June 25, 1910, and was formerly reported under
the title "Alleviation of debris conditions in the Sacramento and
Feather Rivers." The costs under this project were $250,328.71 from
United States funds and $680,000 from contributed funds, a total
of $930,328.71, all for new work, prior to beginning work under
the existing project in 1917. The total expenditures were $680,000
each from United States funds and contributed funds. For further
details of this work see Annual Report for 1917, page 1815 et seq.
   Existing project.-This provides for the enlargement of the river
channel below the mouth of Cache Slough, for making two cut-offs
between the mouth of the Feather River and Colusa, for the construc-
tion of four bypass weirs and the reconstruction of another, for the
construction of outfall gates at mouth of Butte Slough, and the
construction of project levees. These items of work are features of
the general plan of flood control described in the two project docu-
ments, the remaining portions of which are being provided entirely at
State and other local expense.
    The above work is subject to the following provisions, viz:
    (a) That the United States assume responsibility for the execution
of and pay for all work of enlargement and rectification of the river
channels and the construction of weirs, including future purchases
of land and easements for spoil areas.
    (b) That in the future the United States contribute one-half the
cost of construction of the project levees to the grade and with the
cross section adopted by the California Debris Commission, pro-
vided the remaining funds needed be placed at the disposal of the
commission and the work be done by the latter.
    (c) That the limit set on the contribution of the United States by
the act of March 1, 1917, be increased from $5,600,000 to $17,600,000,
including what has already been appropriated.
    (d) That the annual appropriations be increased to $1,000,000,
the limit set by existing law, so as to permit completion of the work
within a reasonable time.
    (e), That the United States return to the State of California the
amount which has been expended on the project by the California
Debris Commission from funds contributed by the State at the time
of the modification approved by the act of May 15, 1928.
    (f) That the United States do whatever work may be found neces-
sary to maintain the increased capacity of the channels of the rivers,
sloughs, and other waterways, including protection of their banks,
  and to insure the preservation of the weir structures in effective
condition.
    (g) That the added contribution and the assumption by the United
  States of the increased responsibility be conditional on the passage
  of legislation by the State of California which shall provide for the
  execution of the remainder of the project at the expense of the State
  and other local interests, in general conformity with the suggestions
  contained in the report of California Debris Commission in Senate
  Document No. 23, Sixty-ninth Congress, first session, and which shall
1436   REPORT   OF   CHIEF OF ENGINEERS,    U.   S.   ARMY,   1934

also make illegal any levees, ditches, or other works in the bypasses
or on the lands reserved for overflow that might reduce or impede
the flood run-off, unless approved by the California Debris Com-
mission.
   The estimate of cost for new work, made in 1925, is $20,791,500,
exclusive of amounts expended under previous projects, of which the
sum of $3,191,500, half of the estimated cost of future levee construc-
tion, is to be contributed by local interests. The United States is to
assume responsibility for the maintenance of all work in the river
channels and of the weirs, estimated in 1925 to cost $100,000 annu-
ally, and local interests are to assume responsibility for the main-
tenance of all other parts of the project. The operation of the mov-
able top of the Sacramento weir is to be undertaken by the State, in
accordance with schedules to be established by the California Debris
Commission.
   The existing project was adopted by the Flood Control Act of
March 1, 1917 (H.Doc. No. 81, 62d Cong., 1st sess., as modified by R.
and H. Com. Doc. No. 5, 63d Cong., 1st sess.), and modified by the
Flood Control Act of May 15, 1928 (S.Doc. No. 23, 69th Cong., 1st
sess.). For latest published map see the latter document.
   Local cooperation.-The Flood Control Act of March 1, 1917, pro-
vides that no money shall be expended until assurances have been
given, satisfactory to the Secretary of War that the State of Cali-
fornia will contribute annually for the work, until its full equal
share thereof shall have been contributed, sums equal to those ex-
pended annually for the work by the United States; that the river
levees contemplated in the project document will be constructed to
such grade and section and within such time as may be required by
the California Debris Commission; that all rights-of-way, easements,
and lands shall be provided free of cost to the United States, and
that no money paid or expenses incurred therefor shall be computed
as a part of the contribution by the State of California toward the
work of improvement. Such assurances were approved by the Sec-
retary of War as satisfactory on July 13, 1917, and this local coop-
eration, progressive with the work, is now in force.
   The Flood Control Act of May 15, 1928, requires the State of Cali-
fornia or other local interests to contribute one-half the cost of
construction of the project levees to the grade and with the cross
section adopted by the California Debris Commission. One-half
the cost of these project levees was estimated in 1925 to be $3,191,500.
The added contribution and the assumption by the United States of
the increased responsibility is conditional on the passage of legisla-
tion by the State of California which shall provide for the execution
of the remainder of the project at the expense of the State and other
local interests, in general conformity with the suggestions contained
in Senate Document No. 23, Sixty-ninth Congress, first session, and
which shall also make illegal any levees, ditches, or other works,
in the bypasses or on lands reserved for overflow, that might re-
duce or impede the flood run-off unless approved by the California
Debris Commission. The State of California Act of May 4, 1925, in
conjunction with section 2 of the Reclamation Board Act, fulfills the
above-required conditions.
                   CALIFORNIA DEBRIS COMMISSION                   1437
   Terminal facilities.-See page 1287.
   Operations and results during fiscal year.-New work: Govern-
ment plant and hired labor placed 72,085 cubic yards of material
at a cost of $17,350.15, and contractors 657,301 cubic yards at a cost
of $96,086 in levees along the Sacramento and American Rivers
and Yolo Bypass. Stream flow was metered and automatic water-
stage recorders installed at four weirs at a cost of $6,143.26. Surveys
and preparation of plans cost $19,052.03. Contractors reconstructed
a power transmission line 11/2 miles long at a cost of $3,059.33, and
placed 45,753 cubic yards of rock revetment backfilling at a cost of
$3,431.43, below Cache Slough. Maintenance: Government plant
and hired labor were used to remove 24,950 cubic yards of material
and 2,095 trees for bank protection work below Knights Landing;
clear brush and trees from 50 acres of land in front of three weirs;
and repair needles in Sacramento Weir, at a cost of $24,977.40. A
contractor placed 14,491.7 tons of riprap along the river bank above
Knights Landing at a cost of $44,549.43.
   Work done with funds allotted by the Federal Emergency Admin-
istration of Public Works consisted of enlarging the Sacramento
River Channel below Cache Slough by dredging; protecting the
river banks and enlarging existing and constructing new levees along
the Sacramento River and tributaries:
   New Work: United States hydraulic dredge removed 1,843,500
cubic yards of material at a cost of $138,308.45, and two hydraulic
dredges, under contract, 3,372,900 cubic yards at a cost of $379,592.35,
in enlarging the Sacramento River Channel below Cache Slough.
Contractors placed 60,437.3 tons of riprap shore protection along the
river bank at a cost of $107,102.16, and raised an electric power
transmission line crossing a spoil area at $4,571.29; and hired labor
repaired embankments and power lines on spoil area at a cost of
$2,580.66, below Cache Slough. Hired labor planted grass on 64.8
acres of spoil area at a cost of $4,639.65. United States plant and
hired labor placed 24,700 cubic yards of earth and 11,060 tons of
rock at a cost of $7,348.36; and a dragline, on an hourly basis con-
tract, placed 3,000 cubic yards of earth at a cost of 334.11 in the
Colusa Weir levees. Levees totaling 623,380 cubic yards, were con-
structed, under contract, at a cost of $139,967.81, and hired labor
reshaped levees, constructed drains, etc., at a cost of $5,094.67, along
the Sacramento and Feather Rivers and Yolo Bypass. Surveys
were made and plans prepared for outfall gates at the mouth of
Butte Slough at a cost of $1,049.44. Surveys along the Sacramento,
American, and Feather Rivers and Yolo Bypass cost $28,180.60,
and a general survey of Sacramento River below Cache Slough,
$1,856.61.
   Maintenance: United States plant and hired labor removed 230
trees and snags, and moved 120,560 cubic yards of material at a cost
of $14,564.45. Draglines on an hourly basis contract shaped 2,100
linear feet of river bank and placed 11,200 cubic yards of material
behind rock revetment, at a cost of $4,258.19; and contractors placed
24,797 tons of riprap at a cost of $72,872.87; all for bank-protection
work above Knights Landing.
 1438        REPORT           OF      CHIEF OF ENGINEERS,                 U.      S. ARMY,            1934

    Total cost of all work under this project was as follows:

                                                                       New work           Maintenance              Total

United States funds:
    Regular appropriation _________________-        _______              $61, 579. 37        $54, 526. 83        $116, 106. 20
    Public Works funds__ ______--____----------                          820, 626. 16         91, 695. 51         912, 321. 67

     Total United States funds_____   __________---                      882, 205. 53         146, 222. 34      1, 028, 427. 87
Contributed funds____-----_..------------------------                     83, 542. 83          15, 000. 00          98, 542. 83

      Total all funds.-----------..               ..----- ...--------------965, 748. 36
                                                  ......---                                   161, 222. 34      1, 126, 970. 70



   The total expenditures were $977,413.04, of which $878,870.21 was
United States funds, including $738,032.95 Public Works funds and
$98,542.83 contributed funds.
   Condition at end of fiscal year.-The existing project is 67 percent
completed.
  The total excavation under the existing and previous projects, for
new work and maintenance, is 172,519,256 cubic yards, of which
139,287,880 cubic yards, including 2,272,850 cubic yards for mainte-
nance, were excavated by United States hydraulic dredges, 20,317,996
cubic yards by contract hydraulic dredges, and 12,913,380 cubic yards
by contract clamshell dredges.
  It is estimated that this has produced a channel with a capacity
of 575,000 second-feet below Cache Slough.
  Cut-offs at Collins Eddy and between Wild Irishman and Kinneys
Bends were made in 1918 and 1919, respectively. Sacramento Weir
was completed in 1917, Fremont Weir in 1924, Tisdale and Moulton
Weirs in 1932, and Colusa Weir in 1933. Outfall gates at Knights
Landing were constructed in 1930. No work has been done on the
construction of the outfall gates at the mouth of Butte Slough.
  For controlling depths, see report on Sacramento River navigation
project, page 1287.
  The total cost of the existing project was as follows:

                                                                New work            Maintenance                  Total

United States funds:
   Regularappropriation......----------------------- $12, 593, 553. 86                    $473, 576. 78      $13, 067, 130. 64
   Public Works funds-....--------------------------     820, 626. 16                       91, 695. 51           912, 321. 67
     Total United States funds----------------_                13, 414, 180. 02            565, 272. 29       13, 979, 452. 31
Contributed funds--.-----------.--------...     --                 612, 184. 39             15, 000. 00           627, 184. 39
     Total all funds.-___-___________      _--___-__ _         14, 026, 364. 41            580, 272. 29       14, 606, 636. 70


  The total expenditures on the existing project were $14,167,115.24,
of which $13,539,930.85 were United States funds including $738,-
032.95 Public Works funds, and $627,184.39 contributed funds.
  Proposed operations.-The balance unexpended at the end of the
year, amounting to $1,420,240.55 (including $366,810.51 contributed
or to be contributed by local interests, and accounts receivable,
$13,476.39), will be applied as follows:
Accounts payable June 30, 1934 -____ ______      __________________ $29, 755. 64
Unaudited liabilities (including completion of existing contracts)__ 14, 050. 24
                           CALIFORNIA               DEBRIS COMMISSION                       1439
New  work:
    Completion of enlargement of river channel below the mouth
      of Cache Slough to mouth of river, 15 miles, from October
      1934 to May 1935, by U. S. hydraulic pipe-line dredge Sacra-
      mento, and attendant plant, including related miscellaneous
      work and surveys, by hired labor; also drydocking and
      overhauling (by contract) ; and expenses of plant while idle
      (hired labor)       _.___--   ____--------__-------             $180, 000. 00
    Revetment work as shore protection, including reenforcement
      by fill with clamshell dredge, August to December 1934, in
      vicinity of preceding locality by contract-----------------       43, 000. 00
    Construction of outfall gates at mouth of Butte Slough, near
      Sutter City, Calif., by contract, August to December 1934__       90, 000. 010
    Reconstruction of abutments at Tisdale Weir by contract,
      August to October 1934_   ------------_--------------- ---         5, 000. 00
    ,Construction of levees under cooperative program with local
      interests: Along Cache and Lindsay Sloughs, and Miner
      Slough, 10 miles north of Rio Vista (Yolo Bypass) ; near
      Marysville, along south side:of Yuba River and east side of
      Feather River; along Sacramento River, from Colusa Weir
      to Moulton Weir, from Colusa southerly 45 miles, and north-
      erly from 8 to 21 miles above Colusa (including miscellane-
      ous surveys, plans, and estimates), by contract and hired
      labor, throughout the fiscal year (about 90 percent contract
      work)                              --------         -----------  596, 000.00

      Total for new work___                         __                --------         914, 000. 00

1Maitntenance:
    Repair and preservation of :structures for which the United
       States is responsible including weirs and outfall gates and
       their approach and talus channels and bank protection
       below Cache Slough. -By contract and with government
       plant and hired labor, August. 1934 to May 1935_ -__ _--                        160, 000. 00
    Dredging by U. S. hydraulic pipe-line dredge Sacramento and
       attendant plant, September 1934; and maintenance of store-
       house, yards, and grounds at Rio Vista, Calif., during the
      fiscal year ______--_--                                 -24,                          000. 00

      Total for maintenance                                  ----------                184, 000. 00

      Total application of funds above, including contributions__ 1, 141, 805. 88
3Balance   remaining      ______-----------------               ---                    278, 434. 67

       Total _-----------------------------                                          1, 420. 240. 55
   The balance unexpended at the end of the year from funds re-
ceived under the National Industrial Re:overy Act, amounting to
$1,302,295.57, including accounts receivable $5,328.52, and $535,000
contributed, or to be contributed by the State of California, will be
applied as follows:
Accounts payable, June 30', .1934_
                                 ------------------------                 --     -    $179, 595. 57

iNew work:
    Completion of 2 contracts for dredging, in enlargement of
      river channel below the mouth of Cache Slough, including
      related miscellaneous work and surveys, July 1934 to
      February 1935----------------------------------------                            242, 000. 00
    Construction of project levees, with surveys, plans, and esti-
      mates, under cooperative program with local interests
       (contributing one-half the cost), July 1934 to June 1935, by
     .contract (including completion of existing contracts) :
      Along east levee of Yolo Bypass below Sacramento; the
      south bank of American River, east of Sacramento; the
      Feather River, near Marysville; and the Sacramento River,
      from 5 miles below to 2 miles above Colusa; and care of
      drainage intercepted by east levee of Sutter Bypass      -.                      822, 000. 00
     91536-ENG 1934--91
1440     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                        1934

New work-Continued.
   Revetment work as shore protection, from Cache Slough to
     mouth of river, by contract, September and October 1934,
     with surveys, etc----------------------------------                     $48, 000.00

       Total for new work         -------------------------------           , 112, 000. 00

Maintenance: Completion of 2 contracts for riprap bank protec-
tion above Colusa and near Knights Landing, July to Sep-
tember 1935 ------------   -------------------------------                   10, 700. 00

       Grand total ---------------------------------------                 1, 302, 295. 57
  The additional sum of $1,805,000, including a balance of $227,744
remaining from prior appropriations and $805,000 to be contributed
by local interests, can be profitably expended during the fiscal year
1936 as follows:
New work: Construction of project levees, with surveys and plans
  under cooperative program with local interests (contributing one-
  half the cost), by contract: Along the flood-control project lines of
  the Sacramento, American, and Feather Rivers, and Yolo Bypass,
  during entire fiscal year (exact location to be determined by mu-
  tual agreement with contributing interests)------------------         $1, 510, 000

Maintenance:
   Dredging flood channels, from Cache Slough to mouth of river,
      by U. S. hydraulic dredge Sacramento, or San Joaquin, July
      to December 1935 ------------------------------  __      _                 125,; 000
   Repair and preservation of structures for which the United
      States is responsible, including weirs and outfall gates and
      their approach and talus channels, and bank protection below
      Cache Slough. By contract and with Government plant and
      hired labor, July 1935 to June 1936 -----------------------                170, 000
       Total for maintenance--------------------------------295,                       000
       Total application of funds                              _______-- _-----_----__
                                                                             1, 805, 000
  The above amount for maintenance is in excess of the average
cost of maintenance during the preceding 5 years due to the in-
creased amounts of bank-protection work necessary (for which local
interests will contribute one-third of the cost), as the project ap-
proaches completion, and as a practically negligible amount of such
work has been done in past years.
                            Cost and financ al summary
                      MAINTENANCE AND IMPROVEMENT       FUNDS

Cost of new work to June 30, 1934_______________________ $12, 843, 882. 57
Cost of maintenance to June 30, 1934_....   _-_-__-           473, 576. 78
      Total cost of permanent work to June 30, 1934----------             13, 317, 459. 35
Value of plant, materials, etc., on hand June 30, 1934      --------          180, 717. 80
      Net total cost to June 30, 1934 ___.....         ____     __-       13, 498, 177. 15
Plus accounts receivable June 30, 1934_-...........    __     __..             13, 476. 39
      Gross total costs to June 30, 1934_.......      ____     __         13, 511, 653. 54
Minus accounts payable June 30, 1934_..........        __            -____-    29, 755. 64
       Net total expenditures ----------------------------                13, 481, 897. 90
Unexpended balance June 30, 1934--.-----------------                      - 1, 039, 953. 65
       Total amount appropriated to June 30. 1934-----..            ...   14, 521, 851. 55
                               CALIFORNIA                   DEBRIS COMMISSION                                                 1441

Fiscal year ending June 30             1930                     1931                 1932                1933               1934


Cost of new work ..   ..---------- $744, 353. 60            $863, 217. 18          $734, 435. 63     $1, 080, 457. 62       $61, 579. 37
Cost of maintenance .--------        47, 446. 97              96, 865. 47             4, 818. 61         105, 161. 82        54, 526. 83

      Total cost           ..------------791, 800. 57         960, 082. 65          739, 254. 24      1,185, 619. 44        116,106. 20
Total expended__..        _ __ 15, 127, 607. 84               920, 654. 77          815, 624. 50        976, 812. 07        140, 837. 26

Allotted__ --------- _-             1, 000, 000. 00        1,000, 000. 00     .-              -       1,719, 418. 40       -17, 466.85

  1 Includes $4,370,000 refunded to State of California.

                                    ----------
Balance unexpended July 1, 1933--_________                                                                        $1, 198, 257. 76
Deductions on account of revocation of impounded balances_..-                                                          17, 466. 85

      Net amount to be accounted for___          -______----1,1__180, 790. 91
Gross amount expended ---     __-__________--_ $289, 198.89
Less:
    Reimbursements collected_____-   $138,199.19
    Receipts from sales ___________-
                             -10,         162.44
                                                 148, 361. 63
                                                                 140, 837. 26
      Balance unexpended June 30, 1934 _____        _______---                                                     1, 039, 953. 65
Outstanding liabilities June 30, 1934_______________ $18, 109. 62
Amount covered by uncompleted contracts--------25,696.26
                                                                                                                          43, 805. 88
       Balance available June 30, 1934__                                      -___-__              -___-___-             996, 147. 77
Accounts receivable June 30, 1934                                           _______                                      13, 476.39

          Unobligated balance available June 30, 1934__----- -----                                                  1, 009, 624.16

Amount (estimated) required to be appropriated for completion
                        -- --                        - -- - --
of existing projects 1___________________________                                                                 2, 191, 620. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1936:
                                                               -- - - - - - - - - - - -
   For new work 1- - - - - - - - - - - - - - - - - - - - - - -                                                           527, 256. 00
   For maintenance- ________________________________                              __                                     245, 000. 00

          Total      _                                         _
                                                  ------------------                                                     772, 256. 00

                                               PUBLIC WORKS FUNDS

Cost of new work to June 30, 1934__     ____-                                                --               -         $820, 626. 16
Cost of maintenance to June 30, 1934-------------__                                                 -------               91, 695. 51
      Total cost of permanent work to June 30, 1934 ________                                                             912, 321.67
Value of plant, materials, etc., on hand June 30, 1934                                             --------                    12.51

      Net total cost to June 30, 1934_-__   __-__-----                                                                   912, 334. 18
Plus accounts receivable June 30, 1934____________________                                                                 5, 328. 52
      Gross total costs to June 30, 1934---------------------                                                            917, 662. 70
Minus accounts payable June 30, 1934-----   ----------     _                                                             179, 629. 75

     Net total expenditures -------------------------------                                                              738, 032.95
Unexpended balance June 30, 1934_ ______-__________--                                                                    761, 967.05
         Total amount appropriated to June 30, 1934_ -____-___-                                                     1, 500, 000. 0

   1 Exclusive of available funds.
1442           REPORT            OF CHIEF OF ENGINEERS,                                         U.         S.   ARMY,                   1934


    Fiscal year ending June 30                      1930                   1931                      1932                    1933                   1934


Cost of new work--..-...          . ..     ...        .    .   ..      .    ..     .     ..      .     .    .   ..      ..      .       .        $820, 626. 16,
Cost of maintenance             _ _                                                                                                                91, 695. 51
        Total cost .--------------                                                                                                                912, 321. 67

Total expended ---         - -------------------------.         --..........
                                                    -----.
                                                         --------.                                          ...... ......           .       .     738, 032. 95
Allotted .-- .........             --------------------------------------------------------                                                     1,500, 000. 00


Amount allotted from National Industrial Recovery Act ap-
  proved June 16, 1933_                                          $1, 500, 000. 00
Gross amount expended ----------------------       $751, 201. 81
Less :
    Reimbursements collected ________ $12, 792. 06
    Receipts from sales___      -_____     376. 80
                                                     13, 168. 86
                                                                     738, 032. 95

      Balance unexpended June 30, 1934 ______ ___   ____----761, 967. 05
Outstanding liabilities June 30, 1934____-----    $8. 391 75
Amount covered by uncompleted contracts--------- 677, 766. 04
                                                              686, 157. 79

      Balance available June 30, 1934 -----------------------                                                                                   75, 809. 26
Accounts receivable June 30, 1934_....                                                                                                           5, 328. 52

            Unobligated balance available June 30, 1934---_,_-------                                                                            81, 137. 78

        CONSOLIDATED COST AND FINANCIAL                                    SUMMARY FOR UNITED STATES FUNDS

Cost of new work to June 30, 1934__-                                                                                         -$13,  664, 508. 73
                                                                                                                                $------------
Cost of maintenance to June 30, 1934___-                                                     -565,
                                                                                       _______--------                                   272. 29

       Total cost of permanent work to June 30, 1934__-- __ -14, 229, 781. 02
Value of plant, materials, etc., on hand June 30, 1934__ -____  180, 730. 31

      Net total cost to June 30, 1934____------------------                                                                             14, 410, 511. 33
Plus accounts receivable June 30, 1934-----------------------                                                                                18,.804. 91

      Gross total costs to June 30, 1934-..._____-                                                                                      14, 429, 316. 24
Minus accounts payable June 30, 1934_      -          -209,
                                                -___ _____--                                                                                     385. 39

      Net total expenditures__ ---------------------        ----                                                                        14, 219, 930. 85
Unexpended balance June 30, 1934_       ______      ________....                                                                        1, 801, 920. 70

            Total amount appropriated to June 30, 1934_.-----                                                                    16, 021, 851. 55
                                                                                                                               -___

 -Fiscal year ending June 30                 1930                    1931                       1932                     1933                       1934


                                          $744, 353. 60         $863, 217. 18             $734, 435. 63          $1, 080, 457. 62                $882, 205. 53
Cost of new work ..........
Cost of maintenance          -------        47, 446. 97           96, 865. 47                4, 818. 61              105, 161. 82                 146, 222. 34

        Total cost-----------              791, 800. 57             960, 082. 65              739, 254. 24           1, 185, 619. 44             1, 028, 427. 87

Total expended_            _---------I 15, 127, 607. 84             920, 654. 77              815, 624. 50             976, 812. 07                878, 870. 21

Allotted-.....----------      ------     1, 000, 000. 00       1, 000, 000. 00                                       1, 719, 418. 40             1, 482, 533. 15


   1 Includes $4,370,000 refunded to State of. California.
                              CALIFORNIA DEBRIS: COMMISSION                                                 1443
Balance unexpended July 1, 1933                       $1, 198, 257.76
Amount allotted from National Industrial Recovery Act
  approved June 16, 1933___
                         --------- __-_____-_________  1, 500, 000. 00

      Amount to be accounted for ________-------__        ____                                     2, 698, 257. 76
Deductions on account of revocation of impounded balances___.                                          17, 466. 85

      Net amount to be accounted for_______________________                                        2, 680, 790. 91
Gross amount expended______________________ $1,040, 400. 70
Less:
    Reimbursements collected- -__ $150, 991.25
    Receipts from sales-- -----
                              ___-    10, 539. 24
                                                   161, 530. 49
                                                                                                      878, 870. 21
      Balance unexpended June 30, 1934___________________                                          1, 801, 920. 70
Outstanding liabilities June 30, 1934------------_ $26, 501. 37
Amount covered by uncompleted contracts-----..     703, 462. 30
                                                                                                      729, 963. 67
     Balance available June 30, 1934-----     ------------- 1, 071, 957. 03
Accounts receivable June 30, 1934---------------------------    18, 804. 91

        Unobligated balance available June 30, 1934__-___                             __           1,090, 761. 94

Amount (estimated) required to be appropriated for completion
                            - - - - -- - - - - - - - - - - - - - - -                               2, 191, 620. 0 0
of existing project 1
Amount that can be profitably expended in fiscal year ending
June 30, 1936:
     For new work _____________________________________                                               527, 256. 00
                        -
     For maintenance __     -__    ---                                                -__             245, 000. 00

         Total' __                                                                                    772, 256. 00
                                           CONTRIBUTED        FUNDS

Cost of new work to June 30, 1934_______________                                     _____         $1,292, 184. 39
Cost of maintenance to June 30, 1934_ __-.....   _                                                     15, 000. 00

        Total cost of permanent work to June 30, 1934----------                                    1, 307, 184. 39

Net total expenditures  ___      -_-_                                                              1,307, 184. 39
Unexpended balance June 30, 1934    _--------------------                                             322, 899. 81

        Total amount contributed to June 30, 1934 -------------                                    1, 630, 084. 20

   Fiscal year ending June 30            1930            1931           1932                1933           1934


Cost of new work.__-     --    -       $21, 754. 82   $154, 026. 44   $94, 335.46     $258, 627. 00       $83, 542. 83
Cost of maintenance-   ....---.
                           ------.---------             ...
                                                  ------------- ----------- ----------------               15, 000.00
      Total cost                             754.82
                              __----------------21,    154, 026.44     94, 335.46      258, 627.00         98, 542. 83
Total expended         ---              21, 754. 82    154, 026. 44    94, 335. 46     258, 627. 00        83, 542. 83
Contributed-------------------          86, 384. 00    116, 116. 93   144, 627. 63     301, 660. 04       301, 295. 60

   1Exclusive of available funds.
1444           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                         1934

Balance unexpended July 1, 1933--------------------- -----                                                         $120, 147. 04
Amount contributed by State of California__                                                                         301, 295. 60

           Amount to be accounted for-----------------------                                                           421, 442. 64
Gross      amount expended -----------------------------------                                                          98, 542. 83

           Balance unexpended June 30, 1934--------------------322, 899. 81

Amount (estimated) required to be contributed for completion
of existing project --------------------------------- 2, 291, 415. 80
Amount that can be profitably expended in fiscal year ending June
30, 1936:
   For new work       --------------------------------------                                                           755, 000. 00
   For maintenance 1-------------------------------------                                                               50, 000. 00

          Total '-------------------805,                                                                                    000. 00

   CONSOLIDATED COST AND FINANCIAL SUMMARY FOR SACRAMENTO                                                        RIVER, CALIF.

Cost of new work to June 30, 1934-------------------   --- $14, 956, 693. 12
Cost of maintenance to June 30, 1934------------------------580, 272.29
      Total cost of permanent work to June 30, 1934----------15, 536, 965.41
Value of plant, materials, etc., on hand June 30, 1934---------  180, 730. 31

      Net total cost to June 30, 1934---------------------15, 717, 695. 72
Plus accounts receivable June 30, 1934-----------------------  18, 804. 91

     Gross total costs to June 30, 1934-----------------                                                         15, 736,500. 63
Minus accounts payable June 30, 1934-------------- -------                                                           209, 385.39

     Net total expenditures                                                                                       5, 527, 115. 24
                                                                                                                 1----------------------------
Unexpended balance June 30, 1934__                                                                                2, 124, 820. 51

           Total amount appropriated and contributed to June 30,
             194 _.------------------------------------------_--                                                 17, 651, 935. 75

    Fiscal year ending June 30                        1930              1931            1932              1933              1934


Cost of new work............-...                  $766, 108. 42 $1,017, 243. 62      $828, 771.09 $1, 339, 084. 62        $965, 748. 36
Cost of maintenance  -- -------                     47, 446. 97     96, 865. 47         4, 818. 61    105, 161. 82         161, 222. 34
       Total cost-----..............----------     813, 555. 39    1, 114, 109. 09    833, 589. 70   1, 444, 246. 44     1, 126, 970. 70

Total expended-------........---.........---15, 149, 362. 66       1, 074, 681. 21    909, 959. 96   1, 235, 439. 07       977, 413. 04

Allotted and contributed--------......           1, 086, 384. 00   1,116, 116. 93     144, 627. 63   2, 021, 078. 44     1, 783, 828. 75

  I Includes $4,370,000 refunded to State of California.

Balance unexpended July 1, 1933 ------------------------        $1, 318, 404. 80
Amount contributed by State of California-------- $301, 295. 60
Amount allotted from National Industrial Recovery
  Act approved June 16, 1933----------------- 1,500, 000.00
                                                                 1, 801, 295.60

      Amount to be accounted for-----------------------                                                           3, 119, 700. 40
Deductions on account of revocation of impounded balances--_.                                                         17, 466. 85

           Net amount to be accounted for--------------------                                                     3, 102, 233. 55

    1 Exclusive of available funds.
                          MISSISSIPPI RIVER COMMISSION                        1445
Gross amnount expended             _____-_         $1, 138,943. 53
                                                _---
Less:
    Reimbursements collected-------- $150, 991. 25
    Receipts from sales-------------    0, 539. 24
                                                       161, 530. 49
                                                                       $977, 413. 04

      Balance unexpended June 30, 1934----------------------2, 124, 820. 51
Outstanding liabilities June 30, 1934_ _.-------_ $26, 501. 37
Amount covered by uncompleted contracts--------   703, 462. 30
                                                               729, 963. 67
     Balance available June 30, 1934-----------------------4_--       1, 394, 856. 84
Accounts receivable June 30, 1934--------------- --------------           18, 804. 91

     Unobligated balance available June 30, 1934--------------        1, 413, 661. 75
Amount (estimated) required to be appropriated for completion
of existing project ---------------------------------------          4, 483, 035. 80

Amount that can be profitably expended in fiscal year ending
June 30, 1936:
   For new work -----------------------------------------             1, 282, 256.00
   For maintenance 1----------------------------------------             295, 000. 00

       Total ------------------------------------------------         1, 577, 256. 00

                  MISSISSIPPI RIVER COMMISSION

   Coqmmission headquarters.-Vicksburg (Miss.) Office, Johnston
Circle, Vicksburg National Military Park. Address, P. 0. box 665.
   Commissioners.-The commissioners during the fiscal year were
Brig. Gen. H. B. Ferguson, Corps of Engineers, president; Edward
Flad, civil engineer; Col. Ernest Graves, United States Army, re-
tired; Col. George R. Spalding, Corps of Engineers; and Leo O. Col-
bert, commander, United States Coast and Geodetic Survey.
   The Mississippi River Commission, constituted by act of Con-
gress of June 28, 1879, is in charge of the improvements of the
Mississippi River from Head of Passes to the mouth of the Ohio
River, including the rectification of Red and Atchafalaya Rivers
at their junction with the Mississippi, the building of levees, and
the improvement of the several harbors for which specific appro-
priations have been made. It was charged with the survey of the
Mississippi River from Head of Passes to its headwaters and with
gaging the river and its tributaries. Act of Congress approved
March 4, 1913, provided funds for levees from Cape Girardeau, Mo.,
to Rock Island, Ill., and acts approved July 27, 1916, and March 1,
1917, provided for continuation of levee work between those points
and extended the jurisdiction of:the commission to include work
on the Ohio River from its mouth to the mouth of the Cache River,
and on the Arkansas River from its mouth to its intersection with
the division line between Lincoln and Jefferson Counties, Ark.
By act of Congress approved September 22, 1922, the jurisdiction
of the commission was extended for purposes of levee and bank
protection to the tributaries and outlets of the Mississippi River
between Cairo, Ill., and Head of Passes, and by act of Congress
approved March 4, 1923, jurisdiction was extended to include the
tributaries and outlets of the Mississippi between Rock Island, Ill.,
  1 Exclusive of available funds.
1446     REPORT OF CHIEF: OF ENGINEERS,                U.   S. ARMY,     1934

and Head of Passes, insofar as they may be affected by the flood
waters of the Mississippi River. By the act of May 15, 1928, the
project authorized therein is to be prosecuted by the Mississippi
River Commission under the direction of the Secretary of War
and supervision of the Chief of Engineers and subject to the pro-
visions of that act.
   Location.-The Mississippi River rises at Lake Itasca, Minn. It
flows in a general southerly direction 2,434 miles, and empties into
the Gulf of Mexico. (See Mississippi River Commission maps and.
charts.)
   Previous projects.-The original project contained in the report-
of the Mississippi River Commission, dated February 17, 1880, con-
templated the permanent fixing and improvement of the channel to
a depth of at least 10 feet at the extreme low water by the contrac--
tion of the low-water width to about 3,000 feet, the protection of
the banks against caving, and the control of the flood water by
means of levees.
   Existing project.-The existing project is to maintain a channel
not less than 9 feet deep and not less than 300 feet wide from the'
mouth of the Ohio River to Head of Passes, near the Gulf of'
Mexico, a distance of 1,070 miles, by open-channel work and by
dredging; to confine the river below Cairo to. a permanent position
by bank revetment and contraction works; to maintain a navigable
channel between the waters of the Mississippi, Red, and Atchafalaya
Rivers; to control flood waters from Rock Island to Head of Passes
by levees; and to make such surveys, examinations, and investiga-
tions of the Mississippi River and its tributaries as may be deemed
necessary for the execution of the project. Specific provisions were
made by the River and Harbor Act of June 3, 1896, for constructing
dredging plant and maintaining for low-water navigation below
Cairo a channel of 250 feet width and 9 feet depth at all periods of
the year, except when stopped by ice; by the act of June 4, 1906,
for extending the limits of levee construction from the mouth of
the Ohio River up to Cape Girardeau, Mo.; by the River and Har-
bor Act of July 27, 1916, for similar further extension of limits of
levee construction from Cape Girardeau, Mo., up to Rock Island,
Ill.; for the extension of limits of construction of both levees and
revetment up the Arkansas River from its mouth to its intersec-
tion with the division line between Lincoln and Jefferson Counties;:
and for the improvement of the Ohio River from its mouth to the
mouth of Cache River; and by the Flood Control Act of March 1,
1917, for the construction of levees needed for flood control in ad-
dition to those needed for navigation, in accordance with "plans of
the Mississippi River Commission heretofore or hereafter adopted,,
to be paid for as appropriations may from time to time be made
by law, not to exceed in the aggregate $45,000,000 ", subject to the
provision that not more than $10,000,000 shall be expended therefor
during any one fiscal year.
   The jurisdiction of the commission was extended by the River and
Harbor Act approved September 22, 1922, for the purpose of levee
   1The River and Harbor Act of Jan. 21, 1927, adopted a project providing for a chan-
nel 35 feet deep at low water and 300 feet wide between Baton Rouge and New Orleans,
La., a distance of 132 miles (H. Doc. No. 105. 69th Cong., 1st sess.). This work is under
the jurisdiction of the first New Orleans engineer district.
                    MISSISSIPPI RIVER COMMISSION                  1447
protection and bank protection to the tributaries and outlets of the
Mississippi River between Cairo, Ill., and Head of Passes, insofar
as these tributaries and outlets are affected by the flood waters of
the Mississippi River. The act approved March 4, 1923 (Public,
No. 528, 67th Cong.), provides for continuing the improvement of
the Mississippi River in accordance with the Flood Control Act
approved March 1, 1917, " and a sum not to exceed $10,000,000 annu-
ally is hereby authorized to be appropriated for that purpose for
  a period of 6 years beginning July 1, 1924 ", and also provides that
any funds which may hereafter be appropriated under authority of
this act, and which may be allotted to works of flood control, may
be expended upon any part of the Mississippi River between Head
of Passes and Rock Island, Ill., and upon the tributaries and outlets
of said river insofar as they may be affected by the flood waters of
said river.
    The project was further modified by the Flood Control Act ap-
proved May 15, 1928, in accordance with the plan set forth in House
Document No. 90, Seventieth Congress, first session. This act author-
ized the appropriation of $325,000,000 for the purpose of carrying
out the project recommended therein, which proposes to protect the
alluvial valley of the Mississippi, consisting of the St. Francis, the
Yazoo, the Tensas, and the Atchafalaya Basins, as well as the allu-
vial lands around Lake Pontchartrain, from the maximum flood pre-
dicted as possible. This is to be done by raising existing levees
about 3 feet and strengthening them greatly and by permitting flood
waters in excess of what the leveed channel will safely carry to find
their way to the Gulf through the natural floodways in the lowlands
of the basins adjacent to the river, which lowlands have always car-
ried extraordinary flood waters. Protecting levees are planned on
the edges of these natural floodways so as to restrain the waters
within them so far as practicable and to protect the good lands out-
side. These protecting levees are to be located so as to reclaim the
maximum amount of land that is economically justified, and where
there are already such levees (for example, in the Atchafalaya
Basin), the project contemplates using the same levees but strength-
ening them. The flood waters will not escape into the floodways
until they have reached a dangerous stage in the main leveed chan-
nel. This insures that the lands within the floodways will be sub-
ject to overflow only during extraordinary floods. In general, the
lands within the floodways will be protected from all floods except
those extraordinary floods which occur on an average of only once in
from 10 to 15 years. A- limited area in the St. Francis Basin in
southeast Missouri, and the city of Cairo, Ill., is to be given addi-
tional safety by a floodway between Birds Point and New Madrid,
Mo., which will, during extraordinary floods only, become an ad-
junct of the main channel and thereby widen the river and hold
,down stages. The city of New Orleans is to be given adequate pro-
tection by a controlled spillway at Bonnet Carre emptying into Lake
Pontchartrain from the river above the city.
    The adopted project also provides for revetting to stabilize the
river channel and prevent excessive caving of banks; this, supple-
mented by contraction works and dredging, will insure a navigable
channel not less than 300 feet wide and 9 feet deep.
1448    REPORT    OF   CHIEF OF ENGINEERS,        U.   S. ARMY,   1934


   The Flood Control Act, in addition to the plan for control of
floods in the alluvial valley, made provision by section 6 for flood-
control work on the Mississippi River between Rock Island, Ill., and
Cape Girardeau, Mo., and on tributaries and outlets, insofar as they
are affected by backwater of the Mississippi; and by section 7 for an
emergency fund to be used in rescue work or in the repair or mainte-
nance of any flood-control work on any tributaries threatened or
destroyed by flood, including the flood of 1927; and for examinations,
surveys, and projects to be made as speedily as possible for flood
control on the tributary streams.
   Section 7 was amended by act approved June 19, 1930, providing
for reimbursement of levee districts or others for expenditures here-
tofore incurred or made in repair, etc., of flood-control works de-
stroyed, etc., by the flood of 1927 or subsequent flood or caving banks
on any tributaries or outlets of the Mississippi River.
   In accordance with section 7 of the act dated May 15, 1928, author-
izing appropriation of $5,000,000 for rescue work or in repair or
maintenance of flood-control work on tributaries of Mississippi
River, the sum of $3,689,291 has been appropriated as follows:
Deficiency Act approved May 291, 1928------------------------ $1, 000, 000,
War Department Appropriation Act approved Feb. 28, 1929 .---------       800,
                                                                    0, 000
War Department Appropriation Act approved May 28, 1930--------     400, 000
War Department Appropriation Act approved Feb. 23, 193.1--------   400, 000
War Department Appropriation Act approved July 14, 1932.----       400, 000
War Department Appropriation Act approved Mar. 4, 1933--------     348, 000
War Department Appropriation Act approved Apr. 26, 1934-------     341, 291

       Total___--------------------------------------------            3, 689, 291
   Recommended modifications of project.-Under date of January
28, 1931, a report was transmitted to Congress recommending certain
flood-control works at the city of Hickman, Ky. (IH. Doc. No. 729,
71st Cong., 3d sess.). Included in Public Works program.
   Under date of March 4, 1931, a report was transmitted to Con-
gress on a review of existing projects for flood control and naviga-
tion of the Mississippi River in its alluvial valley as shown by Public
Document No. 391, Seventieth Congress (H. Doc. No. 798, 71st Cong.,
3d sess.).
   Under date of December 16, 1931, a report was transmitted to Con-
gress on the Mississippi River below Cape Girardeau, Mo., made in
compliance with section 11 of the Flood Control Act of May 15, 1928
 (H. Doc. No. 188, 72d Cong., 1st sess.).
   References to published articles not previously reported: Engi-
neering News-Record issues of June 22 to August 10, 1933.
   Local cooperation.-The Flood Control Act approved May 15,
1928, provides as follows:
   Section 2 provides that no local contribution to the project therein
adopted is required.
   Section 3 reads in part as follows:
  Except when authorized by the Secretary of War upon the recommendation
of the Chief of Engineers, no money appropriated under authority of this act
shall be expended on the construction of any item of the project until the States
or levee districts have given assurances satisfactory to the Secretary of War
that they will (a) maintain all flood-control works after their completion, ex-
cept controlling and regulating spillway structures, including special relief
levees; maintenance includes normally such matters as cutting grass, removal
                         MISSISSIPPI RIVER COMMISSION                       1449
of weeds, local drainage, and minor repairs of main river levees; (b) agree to
accept land turned over to them under the provisions of section 4; (c) provide
without cost to the United States all rights-of-way for levee foundations and
levees on the main stem of the Mississippi River between Cape Girardeau, Mo.,
and the Head of Passes.
     Section 6 provides as follows:
   Funds appropriated under authority of section 1 of the act may be expended
for the prosecution of such works for the control of the floods of the Mississippi
River as have heretofore been authorized and are not included in the present
project, including levee work on the Mississippi River between Rock Island, Ill.,
and Cape Girardeau, Mo., and on the outlets and tributaries of the Mississippi
River between Rock Island and Head of Passes insofar as such outlets or
tributaries are affected by the backwaters of the Mississippi: Provided, That for
such work on the Mississippi River between Rock Island, Ill., and Cape Girar-
deau, Mo., and on such tributaries, the States or levee districts shall provide
rights-of-way without cost to the United States; contribute 331/3 percent of
the costs of the works, and maintain them after completion: And provided
further, That not more than $10,000,000 of the sums authorized in section 1 of
this act shall be expended under the provisions of this section.
  The act approved April 23, 1934 (Pub., No. 171, 73d Cong.), pro-
vides as follows:
   * * * That the Secretary of War is authorized, out of any money avail-
able for carrying out the provisions of the act entitled "An act for the control
of floods on the Mississippi River and its tributaries, and for other purposes ",
approved May 15', 1928, to purchase from, or to reimburse States or local levee
districts for the cost of, any levee rights-of-way or easements for the building
of levees in the Mississippi Valley for which the United States was or is under
obligation to pay under the provisions of the act of May 15, 1928, regardless
of whether said States or local levee districts have furnished such rights-of-way
in the past and regardless of the conditions under which such levee rights-of-
way were furnished, or may be furnished in the future: Provided, That after
careful investigation the prices are found to be reasonable: And provided
further, That payments or reimbursements for levee rights-of-way or easements
conveying the 'privilege of building levees may be made as soon as they have
been acquired in conformity with local custom or legal procedure in such matters
and to the satisfaction of the Chief of Engineers.
  The requirements of the above provisions as to local cooperation
have been and are being fully complied with.
   Terminal facilities.-See Port Series No. 5, port of New Orleans,
La., 1924 (revised 1932), and Transportation Series, Report No. 2,
Transportation in the Mississippi and Ohio Valleys.
   Operations and results during fiscal ;year--Sessions of the com-
mission.-The two hundredth session of the commission (Sept. 21-22,
1933) was held in the offices of the commission located in Vicksburg
National Military Park, Vicksburg, Miss.; the two hundred and
first session (Jan. 7-15, 1934) was held on the steamer Mississippi
from Cairo, Ill. (0.0), to Vicksburg, Miss. (602) ,1 and on the steamer
Gen. John Newton from Vicksburg, Miss., to New Orleans, La.
 (968)1 via Atchafalaya River and Bayou Plaquemine; and the two
hundred and second session (May 1-8, 1934) was held on the steamer
Inspector from Cairo, Ill., to Vicksburg, Miss., and on the steamer
Gen. John Newton from Vicksburg, Miss., to New Orleans, La., via
Atchafalaya River from Simmesport, La., to intracoastal canal at
Morgan City, La., to Harvey Lock, La. (972)1. Public hearings
were given to representatives of navigation, levee, commercial, and
other interests at two of these sessions.
1   Distance in miles below Cairo.
1450   REPORT   OF CHIEF OF ENGINEERS,      U.   S.   ARMY,   1934

   Surveys, gages, and observations.-Gages were maintained and
discharge, slope, and sediment observations made. Surveys were
made over important works and along caving banks. Floodway,
levee repair, and setback, revetment, dike, hydrographic, aerial, and
construction surveys were also made. Observations were made in
connection with the progress of cut-offs and channel rectification and
stabilization on the Mississippi River and Atchafalaya Basin. Pub-
lication of the map of the alluvial valley lower Mississippi River
scale 1: 62,500 was continued.
   Bank protection and regulations.-Below Cairo 28,496 linear feet
 (5.4 miles) of new revetment and 793 linear feet of permeable pile
dikes protecting 1,700 linear feet of bank were constructed and placed
for bank protection; in addition, about 16,842,800 square feet of
mattress and 1,226 linear feet of permeable pile dikes were con_
structed and placed as repairs to and renewals of old bank-pro-
tection work. A total of 5 permeable pile dikes (aggregate length
of 4,878 linear feet) and 6,500 linear feet of sand dikes under con-
traction works program, Mississippi River, were constructed; in
addition, 2,980 linear feet of permeable pile dikes were constructed
for repairs to or renewals of existing contraction works.
   Levees.-A total of 126,368,330 cubic yards of material was placed
in levees during the fiscal year, of which 122,083,871 cubic yards were
placed under section 1 on the main river; 2,720,481 cubic yards under
section 6 on the upper Mississippi or on tributaries; and 1,563,978
cubic yards under sections 6 and 7 of the act of May 15, 1928 (repairs
of flood damage).
   Floodways and spillway.-The intercepting drainage ditch and
set-back levee of the Bird's Point-New Madrid floodway and the
appurtenant structures have been completed, except the closing of a
small gap in the levee at the Missouri-Pacific Railroad crossing; all
rights-of-way have been secured except a small section at the same
railroad crossing on which condemnation proceedings have been
filed. Boeuf Basin levee location surveys were continued as were
hydraulic and other studies; plans and estimates for protection work
on the east bank of Ouachita River at Monroe, La., and vicinity com-
menced during fiscal year 1933, were completed; construction work
under these plans was approximately 60 percent completed during
the fiscal year 1934. All work in connection with the Bonnet Carre
Spillway structure was completed on February 10, 1931; side levees
have been raised to final grade and normal settlement in the swamp
sections restored to project grade and section; extensive clearing was
done in the wooded area to provide for efficient distribution of flow;
gaps remain in the levees for highway and railroads, where bridges
are now under construction, all right-of-way matters, except two
minor cases in process of settlement, having been disposed of. Atcha-
falaya Basin studies were continued; experimental dredging opera-
tions were carried on throughout the greater part of the year to
develop a main channel below the leveed section of the Atchafalaya
River and improve the discharge of floodwaters; construction of
protection levees on the east and west sides of the basin was con-
tinued.
   Dredging operations-Chamnel maintenance dredging.-During
the dredging season of 1933, ending June 30, 1934, 9 dredges were
operated on Mississippi River on 67 crossings from Muscovalley to
                         MISSISSIPPI RIVER        COMMISSION       1451
mouth of White River, 25 to 392 miles below Cairo, in the Memphis
District, a total of 29,673,173 cubic yards of material was moved;
1 dredge and 2 pump barges were operated in the Vicksburg District
on 2 crossings, Indian Point (404)1 and Shipland Point (549)1 mov-
ing a total of 902,570 cubic yards; and 1 dredge was operated in the
second New Orleans District on one crossing, Buckridge (634)1 mov-
ing a total of 208,215 cubic yards of material. With the exception of
the dredging at Indian Point, Shipland, and Buckridge, no other
channel maintenance dredging was required in the Vicksburg or
Second New Orleans Districts in Mississippi River.
    Harbor dredging.-Dredgingwas also done in Memphis Harbor,
227 miles below Cairo, where 423,173 cubic yards of material were
moved.
    Corrective, channel improvement, and miscellaneous dredging,
Mississippi River.-Memphis District, 1,909,184 cubic yards; Vicks-
burg district, 6,990,683 cubic yards; and second New Orleans District
14,041,570 cubic yards.
    Dredging in connection with cut-offs.-Dredging and excavation
work to produce cut-offs and thereby straighten the river channel
and lower flood heights was done at seven points on the Mississippi
River, i. e.: In the Vicksburg District at four points using 4 pipe-line
dredges and 10 levee machines; Leland Neck (472)1 (began through
natural erosion on June 3, 1933), 272,000 cubic yards moved, con-
tinuous flow from July 8, 1933; Worthington Point (505) , 10,580,265
cubic yards, opened December 22, 1933; Willow Point (564)1,
7,493,091 cubic yards, opened April 8, 1934; Marshall Point (587)1,
5,341,908 cubic yards, opened March 12, 1934; in the second New
Orleans District at 3 points using 5 agitator dredges, 5 drag-line
excavators, 4 pipe-line dredges, and 1 bucket dredge; Diamond Point
  (613), 1 422,864 cubic yards, opened January 8, 1933; Giles Bend
  (Cowpen Point) (690), 1 5,373,447 cubic yards, opened May 25, 1933;
and Glasscock (723),1 8,813,679 cubic yards opened March 26, 1933.
In the lower Atchafalaya River, 3 agitator dredges, 3 pipe-line
dredges, and 2 bucket dredges were engaged in experimental correc-
tive dredging and chahnel improvement, at the following locations:
Butte La Rose cut (64) ,2 991,824 cubic yards; Little Devil cut (75) ,2
743,579 cubic yards; Splice Island and Splice Island Chute (79),2
1,131,589 cubic yards; and Tensas Bay (75 to 77),2 650,300 cubic
yards; in addition to the above, 1,175,418 cubic yards of material were
moved from eight other locations ...in improving the Atchafalaya
Basin Channel. Two cut-off channels in the Atchafalaya Basin were
deepened and widened during the fiscal year, 3 pipe-line dredges, 1
bucket dredge, and 2 drag-line excavators were engaged in the work;
the location and work done on the two cut-offs are as follows: Bayou
Chene cut-off (82),2 1,739,174 cubic yards, opened March 4, 1933;
and Cow Island cut-off (72),2 685,631 cubic yards, opened December
23, 1932. Sand traps in the Atchafalaya Basin were made at three
locations, Cowpen Bayou spillway (mile 8 below head of Grand
River), Lake Long (mile 3 below head of Lake Long), and Grand
River (mile 6 below head of Grand River), a total of 714,247 cubic
yards of material was moved in connection with these projects by
two bucket dredges.
1Distance    in miles below Cairo.
2   Distance in miles below head of Atchafalaya River.
1452           REPORT         OF CHIEF OF ENGINEERS,                              U.   S. ARMY,           1934

    Waterways experiment station.-Experiments conducted included
investigations relative to the placement and location of contraction
works, tests on various proposed types of revetment, tests of the
effects of various cut-offs, tide and wave studies as related to the
maintenance and development of harbors, investigations aimed to
determine critical tractive forces for movement of bed materials
found in the Mississippi River and its tributaries, and experiments
for the determination of methods applicable to the problem of di-
verting the bed load of the Mississippi River as desired. The soils
and sediment investigations have included the following: studies of
the location of the hydraulic gradients in levees, study of subsid-
ence in levees, sediment investigations, investigation of proposed
core material for an earth-fill dam. Thirteen studies were under-
taken for engineer districts outside the lower Mississippi Valley di-
vision, as follows: Detroit, 1; Cincinnati, 1; St. Louis, 2; first New
Orleans, 2; Savannah, 1; Galveston, 3; Charleston, 1; Jacksonville,
1; Fort Peck, 1. These experiments included such problems as
studies of methods of channel improvement for navigation, determi-
nation of effects of jetties and breakwaters in harbors, methods for
restoring original water levels in one of the Great Lakes, channel
improvement at Head of Passes and in Southwest Pass, Mississippi
River, determination of the physical properties of proposed core
material for the Fort Peck Dam. Research and experimentation
were continued for the solution of general problems relating to the
control and improvement of the Mississippi River system.
Costs and expenditures during the year, exclusive of receipts from, sales, etc.
                                                                          Costs                       Net expenditures
                                                         New work          Maintenance         New work         Maintenance
                REGULAR FUNDS
United States funds (specific appropriations)
New project:
   Tributary levees and above Cairo (sec. 6,
      Flood Control Act approved May 15,
      1928):
       Rock Island engineer district........                    $43. 21                              $543. 21
       St Louis engineer district-...........              268, 455. 74                          289, 134. 79
       Memphis engineer district ..........                  i -71.43                             11, 964. 05
       Vicksburg engineer district..- ....   _               45, 021.62    --------------         52, 135. 72
    Mississippi levees, including levee work
     around Cairo and certain levees neces-
     sary to keep water out of St. Francis
     Basin (Memphis engineer district) ....          3, 607, 026. 47     $224, 231.75 3, 893, 956. 64           $180, 682.14
   Mississippi levees (Vicksburg engineer
     district)-------------------------------        3, 059, 245. 71      185, 650. 29   2, 991, 947. 49           180, 957. 62
   Mississippi levees (second New Orleans
     district) ---..--- _-..-----            ...-- 2, 502, 407. 56
                                         ------.                          446, 295. 04   2, 497, 797. 10           558, 728. 11
   South bank Arkansas (levees), Vicks-
     burg engineer district__          ___              180, 106. 51 .......-.....-.-       120, 251. 80
   Boeuf Basin levees (Vicksburg engineer
     district) ------------------------------                116. 85                             621.92
   South bank Red (levees), second New
     Orleans district..              _                  182, 547. 07 ...............        182, 547. 07             24,032.54
   Atchafalaya River levees (second New
     Orleans district) .............                    114, 748. 47 ...............-       114, 748. 47               4, 827. 34
   Atchafalaya Basin protection levees
     (second New Orleans district)-.........         2, 931, 605. 39      106, 552. 56 I 2, 826, 552. 14 .............
   South bank Red rights-of-way (levees),
     second New Orleans district-....--..          '    655, 519. 81 ------.....----        648, 100. 00                   _
   Atchafalaya River rights-of-way (levees),
     second New Orleans district....--------             15, 610. 37 ------------............15, 610.37                7, 414. 81
   Rights-of-way protection levees (second
     New Orleans district)--------------..........        2, 641.32 ---------------              300.00 ..
   Flowage floodways (Memphis engineer
     district)-------------------------------           607, 214. 50 ....         ...       612, 188. 77 .............
  1 Minus cost is accounted for by reducing current fiscal year cost instead of total cost
to June 30, 1933, although the decrease is applicable to costs incurred in prior fiscal years.
It is necessary that such decrease be reflected in current fiscal year costs in order to
balance on form no. 90.
                                  MISSISSIPPI            RIVER COMMISSION                                                                     1453
Costs and expenditures during the year, exclusive of receipts from sales, etc.-
                                                       Continued

                                                                            Costs                           Net expenditures
                                                         New work              Maintenance            New work                Maintenance
          REGULAR FUNDS-continued
UnitediStatesfunds (specific appropriations)-
                    Continued
New project--Continued.
   Drainages, Birds Point-New Madrid
     Floodway (Memphis engineer dis-
     trict) _---------------------------. .                                                             -$1, 632. 64
   Rights-of-way and flowage, Bayou des
     Glaises set-back (second New Orleans
     district)----------------------------                   $17, 453. 62--------------                   19, 873. 40
   Construction Bonnet Carre (second
     New Orleans district)-........... .....                 124, 086. 80 .............                  116,181.42
   Rights-of-way, flowage, and damages
     Bonnet Carre (second New Orleans
     district)...............-------------------         4, 361, 416. 88                              4, 369, 201. 52
   Revetments:
        Memphis engineer district .......                                         $35, 897. 10        -233, 170. 51             -$514, 066.50
        Vicksburg engineer district ........                  68, 534. 94         261, 537.90            77, 478. 87                     305, 321. 88
        Second New Orleans district ......--                 822, 048. 78          36, 813. 96          578, 145. 25
   Waterways experiment station (expendi-
     tures from revolving fund, reimburse-
     ments being made quarterly). ---------                                                            -42, 630. 62                  *-14, 210. 20
   Dredging:
        Memphis engineer district-........._             1, 517, 683. 29                              1, 755, 398. 04
        Vicksburg engineer district........                  39, 670. 84                                  52, 142. 60
        Second New Orleans district-.......                 222, 452. 83                                 638, 553. 18
   Contraction works:
        Memphis engineer district .......                    281, 671.18            11, 854. 61           81, 494. 38                -21, 978. 77
        Vicksburg engineer district-........                                                               3, 483. 47         - -    -    -   - -   -   -

   Mapping:                                                                          -
                                                                                    ----      --.--
        Memphis engineer district..........                       793. 87                                  2, 378. 41           ..
        Vicksburg engineer district-.........                 38, 833. 43                                 38, 824. 38
        Second New Orleans district-.....                      4, 926. 38                                  4, 918. 99
   Surveys, gages, and observations:
        Rock Island engineer district.....----                    237. 53                                         237.   53
        St. Louis engineer district- ........            1   -3, 926. 19                                   3,     340.   58
        Memphis engineer district ......- .                   57, 720. 47                                 53,     081.   93
        Vicksburg engineer district........--                164, 420. 50                                166,     116.   78
        Second New Orleans district-........                 168, 231. 71                                165,     667.   42
   Office, Chief of Engineers (allotment for
     Mississippi River Commission work),
     revolving fund, reimbursed quarterly)_                                                                       875.96                        291.98
   Mississippi River commission (expendi-
     tures from revolving fund for office of
     president, Mississippi River Commis-
     sion, reimbursements being made
     quarterly)......                                                                                   -59, 367. 98                 -19, 789. 33

       Total....-----        --.-.-. .
                          ..--            .   -...     22, 058, 496. 03         1, 308, 833. 21     22, 048, 991. 90                     692, 211. 62

         Total, new work and maintenance.-- ........--------------- 23, 367, 329. 24 ---------------                            22, 741, 203. 52

               Contributedfunds
New project:
   Flood control, tributary levees and above
     Cairo (sec. 6, Flood Control Act ap-
     proved May 15, 1928):
        Rock Island engineer district......--        1 -43. 56 --                                     -43.    56 -
                                                                                                         4-------------
        St. Louis engineer district...........     144, 775. 22 ----------------                   144, 775. 22 ..-------------
        Memphis engineer district-..........         5, 913. 75 --------------                       5, 913. 75
        Vicksburg engineer district-.........           189.18 ---------------                          189. 18
   Improvement of Mississippi River
     (levees):
        Memphis engineer district--   ......--       6, 991. 18 ..          ........--------------- 6, 991.18
        Vicksburg engineer district-----..........   1, 200. 58 ......--------------                 1, 200. 58 -------------

            Total............................-               159, 026. 35 --                    -        159, 026. 35

    Consolidated total of regular specific ap-
     propriations and contributed'funds....            22, 217, 522. 38         1, 308, 833. 21      22, 208, 018. 25                    692, 211. 62

         Total-New work and maintenance_                __      --- ___        23, 526, 355. 59 ---------------                 22, 900, 229. 87

   1 Minus cost is accounted for by reducing current fiscal year cost instead of total cost
to June 30, 1933, although the decrease is applicable to costs incurred in prior fiscal years.
It is necessary that such decrease be reflected in current fiscal year costs in order to
balance on form no. 90.
1454             REPORT                 OF CHIEF OF ENGINEERS,                                       U.           S. ARMY,                     1934

Costs and expenditures during the year, exclusive of receipts from sales, etc.--
                                                                  Continued

                                                                                   Costs                                              Net expenditures

                                                                  New work              IMaintenance                            New work              Maintenance

    PUBLIC WORKS ADMINISTRATION FUNDS

United States funds (specific appropriations)

New project:
   Tributary levees and above Cairo (sec.
      6, Flood Control Act approved May
      15, 1928), Memphis engineer district_ --                     $8, 669.        95                                               $8,669.95 I.
   Mississippi levees, including levee work
      around Cairo and             certain   levees   nec-
    ; essary to keep water out of St. Francis
      Basin (Memphis engineer district) ...-- 6, 449, 444.                         36                 $718. 92                 5, 332, 377. 96                            $711. 81
   Mississippi levees (Vicksburg engineer
      district)          _----------------------------           459, 831.         18           149, 913. 78                      383, 634. 54                 138, 459. 28
   Mississippi levees (second New Orleans
      district)---------------                                1, 786, 573.         26                3, 708. 47                1, 724, 289. 40        .............
   Boeuf Basin levees (Monroe Circle),
      Vicksburg engineer district...--------                     700, 891.                    ---
                                                                                   28 -----------                                 650, 493.06         ..............
   South bank Arkansas (levees), Vicks-
      burg.engineer district-....----------                          1, 374.       26 --------------                                  1,175. 28
   Atchafalaya Basin protection levees
      (second New             Orleans  district).   -----
                                                      _.      1, 194,    884.      54                7, 938. 07                1, 149, 290. 34
   Bonnet Carre floodway clearing and
      cleaning (second New             Orleans  district)_         89,   947.      84                                              89, 947. 84
   Revetments:
         Memphis            engineer  district.....-----      1, 305,    335.      09         2, 841,949, 84                   1, 416, 278. 70             3, 083, 494.09
         Vicksburg engineer district..--------                1, 254, 562.         09         1, 663, 778. 89                  1, 287, 839. 70             1, 711, 321. 23
         Second New Orleans district .------                     257, 582.         54         1, 015, 132. 42                     257, 582. 54             1, 160, 296. 92
   Waterways experiment station (expen-
      ditures from revolving fund, reim-
      bursements being made quarterly)..                 -- -----------...                      358, 030. 98                             354. 66                           118. 22
   Dredging:
         Vicksburg engineer district.---------                2, 836, 390.         60                                          2, 728, 190. 57
         Second New Orleans district .------                  2, 398, 875.         10 -------             00                   2, 263, 800. 39
   Contraction works (Memphis engineer
      d is t r i c t ) . .    ._.                 .                76, 276.        21                                              96, 247. 44                 451, 773. 46
   Surveys, gages, and observations (Vicks-
      burg engineer district) ..----------                           6, 985.       87 -.-----------                                   5,666. 63       --   -   -      -    -   -   -




        Total.......                 .
                                   --------------------       18, 827, 624.17                 6,041,171. 37                   17, 395, 839.00              6, 546,175.01

        Total--New work and maintenance_                                  _-___           24, 868, 795. 54 ---                        --- -              23, 942, 014. 01

                      Contributedfunds

Flood control, tributary levees and above
  Cairo (sec. 6, Flood Control Act approved
  May 15, 1928), Memphis engineer district.                               4,334.97 -                  -         --        -          4,334.97        .                 ------------

        Total---.......-------------------------                          4,334.97        -      -                    --             4,334.97 -----------

        Consolidated total of United States
         and contributed funds for National
         Industrial Recovery Act work......                   18, 831, 959. 14                6, 041, 171. 37                 17, 400,173. 97              6, 546, 175.01
        Total-New work and maintenance.--                           .-                    24, 873, 130. 51 --_                                     _ 23, 946, 348. 98
        Grand consolidated total of regular
         and National Recovery Administra-
         tion, United States, and contributed
         funds.........---....------------------              41, 049, 481 52                 7, 350, 004. 58                 39, 608, 192. 22             7, 238, 386. 63
        Grand total-New work and mainte-
         nance...------------------------------..             .    ----                   48, 399, 486. 10 --                    ....-----------         46, 846, 578. 85
UNITED STATES FUNDS (PERMANENT APPRO-
             PRIATIONS, ETC.)

Gaging waters of the Mississippi River and                                                                     1----t--




its tributaries (Memphis engineer district)_                         7, 415. 23                                                    7, 430. 90
Removing sunken vessels or craft obstruct-
ing or endangering navigation, indefinite
  (Memphis engineer district).....-------....                               551. 49                                                 2,152.56
                                                                          7,I96.                          -.                         9. 53.4

       Total.......--..........----........                               7, 966. 721 -                                              9, 583. 46
                       MISSISSIPPI RIVER        COMMISSION                      1455
   Condition at end of fiscal yeavr.-The general survey of the Mis-
sissippi River from Head of Passes, La., to its headwaters at Lake
Itasca, Minn., a distance by river of 2,434 miles, has been completed
and maps of the river published. A resurvey from Cairo, Ill., to
the Head of Passes, La., a distance of 1,070 miles, has been completed
and maps published. Surveys in connection with topographic quad-
rangle map of alluvial valley lower Mississippi River from Cape
Giradeau, Mo., at head of St. Francis Basin to the Gulf of Mexico,
have been made and the map is now in process of publication. Special
surveys, including surveys of the Atchafalaya River and portions
of the Red and Black Rivers, have been made. Various discharge,
gage, sediment, and other observations have been made on the Mis-
sissippi River and tributaries and the Gulf of Mexico. Works for
the improvement of the channel have been executed at various places
below Cairo and levees built for flood control from Rock Island, Ill.,
to near Head of Passes, La., 484 miles above to 1,070 miles below
Cairo. Effective revetment below Cairo is now in place and in
good condition on about 163 miles of river bank; about 5 miles of
permeable dikes and about one-fourth mile of pile and rock groins
for bank protection and about 34.2 miles of permeable dikes for
channel regulation are also in place. There are 2,454 miles of levee
(1,873 miles, sec. 1, main river, and 581 miles, sec. 6, upper river and
tributaries), with earthwork aggregating 869,989,144 1 cubic yards
 (795,135,412 1 cubic yards, sec. 1, and 74, 853,732 cubic yards, sec. 6).
The existing levee system protects a total of about 27,413 square
miles (26,267 square miles, sec. 1, and 1,146 square miles under sec.
6 of act approved May 15, 1928) of land against ordinary floods.
About 77.7 percent of the total yardage required to complete the
levees under section 1 of the adopted grade and section is now in
place; and about 86.1 percent of the total yardage required to com-
plete the levees under section 6 to the approved grade and section
is now in place.
   As a result of dredging, there is now, with rare exceptions, a good
navigable channel at all stages, with a depth of 9 feet or more over
a width of at least 300 feet for a distance of 842 miles below Cairo
and a depth of not less than 35 feet over a width of several hundred
feet for the remaining 240 miles to the Gulf of Mexico. The neces-
sary plant required for surveys, dredging, and bank protection has
been constructed and maintained.
1 Includes 65,939,404 cubic yards to be abandoned in course of construction.




     91536-ENG 194 -     -92
1456              REPORT               OF CHIEF OF ENGINEERS,                                   U.    S. ARMY,            1934

                                        Cost and expenditures to June 30, 1934

                                                                    Cost of new        Cost of main-         Total cost        Total net ex-
                                                                       work              tenance                                penditures

United States funds (specific appropria-
                  tions)
Old project:
    River and harbor funds:
        Prior to Flood Control Act of
          Mar. 1, 1917-------------- $70, 514, 307. 01 $23,140,164. 37                                     $93, 654,471. 38    $93, 654,471. 38
        Subsequent to Flood Control
          Act of Mar. 1, 1917..--..----------91,135. 35 ...-----------....--.......                              91, 135. 35        91, 135. 35
    Flood control funds (all subsequent
      to Flood Control Act of Mar. 1,
      1917) -- ---------------------- 57, 386, 315. 22                23, 350, 783. 85                      80, 737, 099. 07    80, 737, 099. 07
New project:
    Flood control, regular.------------             145, 693, 430. 56 17, 834, 516. 94                     163, 527, 947. 50   178, 505, 175. 23
    Flood control, National Industrial
                       .............---------...--- 18, 827, 624. 17
        Recovery Act----                                               6, 041, 171. 37                      24, 868, 795. 54    23, 942, 014. 01
         Total......----------------------- 292, 512, 812. 31                           70, 366, 636. 53   362, 879, 448. 84   376, 929, 895. 04
                   Contributedfunds

Old project-................-----------------------.............    18, 689, 451. 26        625, 763. 38    19, 315, 214. 64    19, 315, 214. 64
New project:
    Regular ...----------------------------                          1, 203, 921. 14        28, 390. 50 1, 232, 311. 64          1,232, 311. 64
    National Industrial Recovery Act...                                   4, 334. 97   ----------------      4, 334. 97              4, 334. 97
                                    19, 897, 707. 37 654, 153. 88
         Total.........----.....------........-----------.....---.20, 551, 861. 25                                              20, 551, 861. 25
         Grand total---......................---------------       312, 410, 519. 68    71, 020, 790. 41   383, 431, 310. 09   397, 481, 756. 29


  Proposed operations.-The balance unexpended on June 30, 1934,
will be applied during the fiscal year 1935 in the prosecution of work
under the modified project adopted by the Flood Control Act ap-
proved May 15, 1928.
  The sum of $27,360,368, including an estimated balance of $12,-
360,368 on June 30, 1935, from prior appropriations, can be profitably
expended during the fiscal year ending June 30, 1936.
                                                      Cost and financial summary
                                                  UNITED STATES FUNDS (REGULAR)

Cost of new work to June 30, 1934---  ----. .-.                                                 __   __---   $273, 685, 188. 14
Cost of maintenance to June 30, 1934---------                                                  -------------   64, 325, 465. 16

      Total cost of permanent work to June 30, 1934__ ____                                                              338, 010, 653. 30
Value of plant, materials, etc., on hand June 30, 1934- -__-15,                                                              481, 305. 42

      Net total cost to June 30, 1934_ . ._______-                                                              -______353, 491, 958. 72
Plus accounts receivable June 30, 1934 --      ____-_____                                                        -__ -      559, 927. 71

      Gross total costs to June 30, 1934_________________                                                              354, 051, 886.43
Minus accounts payable June 30, 1934--______- ____ _________                                                             1, 064, 005. 40

     Net total expenditures ________           -
                                         __________---                                                     -_           352, 987, 881. 03
Unexpended balance June 30, 1934--   -__------                                                         - ___      _      11, 405, 130. 42

             Total amount allotted to June 30, 1934--------------                                                     1364, 393, 011. 45

   1 Does not include $4,258,418.04, allotted for surveys under sec. 10 of Flood Control
Act approved May 15, 1928 (these surveys not under supervision of Mississippi River
Commission) ; $1,122,113.04, impounded savings carried to surplus fund as provided for
in acts of June 30, 1932, Mar. 20, 19.33, and Mar. 28. 1934; unallotted balance as of
June 30, 1934, amounting to $40,897,921.52; nor $44.000.000, National Industrial
Recovery Act appropriation for Mississippi River Commission work. Amount of
 $174,482,705.80 included herein was expended on the old project: amount of $23,010,
312.27 was made available under provisions of par. 2, sec. 1 of Flood Control Act
approved May 15, 1928; amount of $25.000 was aporopriated by Public Res. No. 41, May
16, 1928, for flood protection on White River, Woodruff and Monroe Counties, Ark.;
and amount of $166.874,993.38 was allotted under par. 1 of sec. 1 of Flood Control Act
approved May 15, 1928.
                              MISSISSIPPI RIVER COMMISSION                                                             1457

  Fiscal year ending            1930                1931                1932                1933                     1934
        June 30

Cost of new work-..       $22,711,470.04      $33, 709, 978. 46   $24,968,029.78      $31,784, 479. 67        $22, 058,496.03
Cost of maintenance...      4, 091, 921. 54     2, 467, 472.39      2,106,142.45        4, 865, 030. 43         1,308, 833. 21
      Total cost ......    26, 803, 391.58     36, 177, 450. 85    27, 074, 172. 23    36, 649, 510. 10        23, 367, 329. 24
Total expended--......     23, 572, 070. 74    35, 008, 169. 17    26, 952, 142. 63    38, 053, 564. 87        22, 741, 203. 52

Allotted------ --------    32, 147, 904. 57    37, 605, 831. 55    4, 239, 294. 96     50, 132, 504. 87        14, 957, 226. 35

  1Does not include $21,240.17 allotted for surveys under sec. 10 of Flood Control Act approved May 15,
1928 (work not under supervision of Mississippi River Commission).

Balance unexpended July 1, 1933-----------------------------     $29, 189,085. 61
Amount allotted from War Department Appro-
  priation Act approved Feb. 23, 1931-----------          $7. 09
Amount allotted from War Department Appro-
  priation Act approved May 28, 1930-------           -826. 69
Amount allotted from War Department Appro-
  priation Act approved July 14, 1932----------       -- 172.26
Amount allotted from War Department Appro-
  priation Act approved Mar. 4, 1933----------   5, 352, 098. 14
                                                                                                          5. 351. 106. 28
                                                                                                          34, 540,    91.89


      Amount to be accounted for--        -   --        --     34, 540, 191. 89
Deductions on account of transfer of impounded savings to sur-
  plus fund as provided for in acts of Mar. 20. 1933. and Mar.
28, 1934----   ------------------------------------------         393, 879. 93

      Net amount to be accounted for __-          -       -_____------ 34, 146, 311. 96
Gross amount expended- --        _____------$35, 947, 094. 16
Less:
    Reimbursements collected___ $13, 071, 266. 37
    Receipts from sales---------     134, 624. 27
                                                    13, 205, 890. 64
                                                                       22, 741, 203. 52

      Balance unexpended June 30, 1934_____________---         111,405, 108.44
Outstanding liabilities June 30, 1934           , 599, 277.28
                                               1-----------
Amount covered by uncompleted contracts------- 2, 785, 069. 08
                                                                 4, 384, 346. 36

      Balance available June 30, 1934--------------------                                                 7, 020, 762. 08
Accounts receivable June 30, 1934-__-__--- -------------                                                   - 559, 909. 96

        Unobligated balance available June 30, 1934-----------                                      - 7, 580, 672. 04

Amount unappropriated under authority of sec. 1 of the Flood
Control Act approved May 15, 1928 2-_---------------                                                67, 846, 576. 00

Amount that can be profitably expended in fiscal year ending
                                                 - - - -
June 30, 1936, for new work and maintenance 2__         __                                          15, 000, 000. 00

   1 Does not include unallotted balance of $40,897,921.52 (act of July 14, 1932, $219.53;
act of Mar. 4, 1933, $11,897,701.99; and act df Apr. 26, 1934, $29,000,000).
   SExclusive of available funds. Includes $741,581.96 for completion of surveys under
sec. 10, Flood Control Act approved May 15, 1928.
1458        REPORT         OF CHIEF OF        ENGINEERS, U.                      S. ARIMY,        1934

                                    PUBLIO WORKS FUNDS

Cost of new work to June 30, 1934___ ________       ______--                                     $18, 827, 624. 17
Cost of maintenance to June 30, 1934_____________________--__                                      6, 041, 171. 37

      Total cost of permanent work to June 30, 1934__________                                     24, 868, 795. 54
Value of plant, materials, etc., on hand June 30, 1934___________                                     789, 077. 21

      Net total cost to June 30, 1934_________________________                                   25, 657, 872. 75
Plus accounts receivable June 30, 1934_______    _____________-                                      240, 386. 06

      Gross total costs to June 30, 1934____________________                                      25, 898, 258. 81
Minus accounts payable June 30, 1934________________________                                       1, 956, 244. 80

                                   ---
     Net total expenditures.___________ -23, _______--                                                942, 014. 01
Unexpended balance June 30, 1934 __________________________                                       18, 205, 860. 94

         Total amount allotted to June 30, 1934_______________                                    42, 147, 874. 95

  Fiscal year ending June 30       1930                 1931             1932          1933               1934


                 .
Cost of new work____________                  ..........----                          __-    -         $18,827,624.17
Cost of maintenance ..........                .-...........                                              6, 041, 171. 37

                 .......
      Total cost_______                       --------------    --------------        ...        .      24, 868, 795. 54

                 -
Total expended -__                                                                                      23, 942, 014. 01
                                          l                    '----
                                                               I-----
Allotted ----------------------                                                                         42, 147,874.95



Amount allotted from National Industrial Recovery Act ap-
  proved June 16, 1933____________________________________            $42, 147,874. 95
Gross amount expended _______----------$33,              271, 802. 35
Less:
    Reimbursements collected__'- $9, 232, 398. 26
    Receipts from sales -------           97, 390. 08
                                                      9, 329, 788. 34
                                                                       23, 942, 014. 01

      Balance unexpended June 30, 1934 ____________________ 118, 205, 860. 94
Outstanding liabilities June 30, 1984____---- $1,848, 545. 53
Amount covered by uncompleted contracts-----   8, 159, 411. 11
                                                               10, 007, 956. 64

      Balance available June 30, 1934_                                                               8, 197, 904. 30
'Accounts receivable June 30, 1934______________________                                                240, 386.06

         Unobligated balance available June 30, 1.934----------                                      8, 438, 290. 36
       CONSOLIDATED        COST AND FINANCIAL              SUMMARY       FOR UNITED     STATES FUNDS

Cost of new work to June 30, 1934_________________________                                   $292, 512, 812. 31
Cost of maintenance to June 30, 1934___________________                                        70, 366, 636. 53
      Total cost of permanent work to June 30, 1934________                                      362, 879, 448. 84
Value of plant, materials, etc., on hand June 30, 1934_________                                   16, 270, 382. 63
      Net total cost to June 30, 1934_______- ____________   379, 149, 831. 47
Plus accounts receivable June 30, 1934-----------------------     800, 313. 77
      Gross total costs to June 30, 1934___                                                      379, 950, 145. 24
Minus accounts payable June 30, 1934........                                                       3, 020, 250. 20
     Net total expenditures________________________                                              376, 929, 895. 04
Unexpended balance June 30, 1934          ______29,                                                   610, 991. 36
         Total amount allotted to June 30, 1934_ .....                           ______          406, 540, 886. 40
  1 Does not include unallotted balance of $1,852,125.05, act of June 16, 1933.
                                 MISSISSIPPI RIVER COMMISSION                                                         1459

  Fiscal year ending              1930                 1931                  1932                1933              1934
       .June 30


Cost of new work ...... $22, 711,470. 04         $33, 709, 978. 46     $24, 968, 029. 78   $31, 784, 479. 67   $40, 886, 120. 20
Cost of maintenance___    4, 091, 921. 54          2, 467, 472. 39       2, 106, 142. 45     4, 865, 030. 43     7, 350, 004. 58

      Total cost_......      26, 803, 391. 58     36, 177, 450. 85      27, 074, 172. 23    36, 649, 510. 10    48, 236, 124. 78

Total expended-......        23, 572, 070. 74     35, 008, 169. 17      26, 952, 142. 63    38, 053, 564.87     46, 683, 217. 53

Allotted______                 32,147, 904. 57
                 ___..........__....              37, 605, 831. 55       4, 239, 294. 96    50, 132, 504. 87    47, 105, 101. 30


Balance unexpended July 1, 1933___- ----------
                                        __-____                  $29, 189, 085. 61
Amount allotted from War Department Appro-
  priation Act Feb. 23, 1931_ _________--__-
                                  -                       $7. 09
Amount allotted from War Department Appro-
  priation Act approved May 28, 1930-.__---     -__- -826. 69
Amount allotted from War Department Appro-
  priation Act approved July 14, 1932___-----         -172. 26
Amount allotted from War Department Appro-
  priation Act approved Mar. 4, 1933-------      5, 352, 098.14
Amount allotted from National Industrial Recov-
  ery Act approved June 16, 1933____-_          42,147, 874.95
                                                                  47, 498, 981. 23

      Amount to be accounted for_____________________                                                     76, 688, 066. 84
Deductions on account of transfer of impounded savings to
  surplus fund as provided for in acts of Mar. 20, 1933, and
  Mar. 28, 1934 -----------------------------------------                                                      393, 879. 98

      Net amount to be accounted for_____-,__----_---                                                     76, 294, 186. 91
Gross amount expended     ------------------- $69, 218, 896. 51
Less:
    Reimbursements collected__ $22, 303, 664. 63
    Receipts from sales-------      232, 014. 35
                                                 22, 535, 678. 98
                                                                                                          46, 683, 217. 53

      Balance unexpended June 30, 1934___________     _-----                                              29, 610, 969. 38
Outstanding liabilities June 30, 1934-  --- $3, 447, 822. 81
Amount covered by uncompleted contracts_.___ 10, 944,480. 19
                                                                                                          14, 392, 303. 00

     Balance available June 30, 1934________ _________-                                                   15, 218, 666.38
Accounts receivable June 30, 1934_______________ __--------                                                   800, 296.02

         Unobligated balance available June 30, 1934-----------                                           16, 018, 962. 40

Amount unappropriated under authority of sec. 1 of the Flood
Control Act approved May 15, 1928_--.....     _______-__-                                                67, 846, 576. 00

Amount that can be profitably expended in fiscal                                    year , ending
June 30, 1936, for new work and maintenance __
                                               - -- - -- - -- - --                                        15, 000, 000. 00
                              CONTRIBUTED FUNDS                (FOR;    REGULAR WORK)


Cost of new work to June 30, 1934------------------------- 19, 893, 372. 40
Cost of maintenance to June 30, 1934                            54, 153. 88
                                                               6------------------------

         Total cost of permanent work to June 30, 1934                              ----------            20, 547, 526. 28

Net total expenditures____________________________                                                        20, 547, 526. 28
Unexpended balance June 30, 1934 ___________________--                                            ___         110, 680. 63

         Total amount contributed to June 30, 1934 _____________                                          20, 658, 206. 91

 .1 Exclusive of available funds.
1460           REPORT OF CHIEF OF ENGINEERS,                                         U.    S. ARMY,                1934


    Fiscal year ending June 30                     1930                1931            1932                 1933             1934

Cost of new work.....-..........                $130, 695. 68     $149, 391.82 $319, 330. 81           $358, 917. 61     $159, 026. 36
Cost of maintenance-------------.............     27, 429. 57           960. 93 --....-------..........------------------------
        Total cost_---.------------ 158, 125. 25                   150, 352. 75      319, 330. 81     358, 917. 61          159, 026. 36
Total expended----------------158, 125. 25                         150, 352. 75      319, 330. 81     358, 917. 61          159, 026. 36
Contributed--------------------                  178, 652. 34      448, 567. 95         821. 31
                                                                                     515,            -14,     791. 76      - 26, 209. 77



Balance unexpended July 1, 1933-------             ------------------ $295, 916. 75
Amount contributed under sec. 6 of Flood Control Act
of May 15, 1928---             ------------------------ $21, 500. 00
Amount contributed for improvement of Mississippi
River under sec. 4 of River and Harbor Act of Mar.
4, 1915-        .......----------------- --------           3, 825. 00
                                                                        25, 325. 00

      Amount to be accounted for-----------_------------       321, 241, 75
Deductions on account of unexpended balances returned to con-
  tributors ($51,324.54) and adjustment of impounded savings
  ($210.23) -----------------     ----------------------------- 51, 534.77

      Net amount to be accounted for-.__---         ___.---------                                                       269, 706. 98
Gross amount expended-----------------------            $159, 261.78
Less reimbursements collected-   __ -                -
                                            -_______-_-  -     235. 43
                                                                                                                        159, 026. 35

      Balance unexpended June 30, 1934-- -                   _
                                                    -__ __-- _..-.. 110, 680. 63
Outstanding liabilities June 30, 1934_ .-....------     - $320. 48
Amount covered by uncompleted contracts----------      62, 791. 19
                                                                     63, 111. 67

      Balance available June 30, 1934 --.--------------                                                     ----         47, 568. 96
Accounts receivable June 30, 1934_------------------------                                                                    17. 75

           Unobligated balance available June 30, 1934_.___.__-
                                                              -                                                          47, 586. 71

                            CONTRIBUTE1D FUNDS (FOR PUBLIC WORKS PROGRAM)

Cost of new work to June 30, 1934----------------------------                                                            $4, 334. 97
Cost of maintenance to June 30, 1934_.    .---  .---------
Total cost of permanent work to June 30, 1934- ._____---                                              ____-               4, 334.97

Net total expenditures_--      _
                            ___--  _____-                                                                                 4,334. 97
Unexpended balance June 30, 1934__-- ---------                                            ------             ----           665. 03
           Total amount contributed to June 30, 1934----.---------                                                        5,000. 00

           Fiscal year ending June 30                           1930          1931            1932            1933            1934


Cost of new work        __-----------           ------------------------------------------------                             $4, 334. 97
Cost of maintenance............................
Totalr epended... --------------------
                           ..                             ------------ ------------            ------------------             4,334.97
Contributed------            ---------------          ----------- ---------               __------------------------          5,000.00


Amount contributed under sec. 6 of Flood Control Act of May
  15, 1928                                                                                                               $5, 000. 00
Gross amount expended --- __ __-______        ___ $4, 425.64
Less reimbursements collected -_________-__ _          90. 67
                                                                                                                          4, 334. 97

           Balance unexpended June 30, 1934--                                 --... ----                                     665.03
                                     MISSISSIPPI RIVER COMMISSION                                                       1461
CONSOLIDATED COST AND FINANCIAL SUMMARY FOR UNITED STATES AND CONTRIBUTED
                                  FUNDS

Cost of new work to June 30, 1934______________----------$312, 410, 519. 68
Cost of maintenance to June 30, 1934_---- ____-      -_______ 71, 020, 790. 41

      Total cost of permanent work to June 30, 1934------    __                                            383, 431, 310. 09
Value of plant, materials, etc., on hand June 30, 1934 _______                                              16, 270, 382. 63
      Net total cost to June 30, 1934______________________                                               399, 701, 692. 72
Plus accounts receivable June 30, 1934__ _____________                                                         800, 313. 77

      Gross total costs to June 30, 1934--___-------------                                                 400, 502, 006. 49
Minus accounts payable June 30, 1934 __    ___-    __-___-__                                                 3, 020, 250. 20

     Net total expenditures___--...-          -
                                           ________--    -                                                 397, 481, 756. 29
Unexpended balance June 30, 1934____------ --------------                                                   29, 722, 337. 02

           Total amount allotted and contributed June 30, 1934___                                          427, 204, 093.31

  Fiscal year ending                   1930                1931                1932                1933
        June 30                                                                                                      1934


Cost of new work-..              $22, 842, 165. 72   $33, 859, 370. 28   $25, 287, 360. 59   $32, 143, 397. 28   $41, 049, 481. 52
Cost of maintenance...             4, 119, 351. 11     2, 468, 433. 32     2, 106, 142. 45     4, 865, 030. 43     7, 350, 004. 58
      Total cost-.....26, 961, 516. 83                36, 327, 803. 60    27, 393, 503. 04    37, 008,427. 71     48, 399, 486. 10
Total expended-.......            23, 730, 195. 99    35, 158, 521. 92    27, 271, 473. 44    38, 412, 482.48     46, 846, 578.85
Allotted    and contri-
  buted       ...-------------    32, 326, 556. 91    38, 054, 399. 50     4, 755, 116. 27    50, 117, 713. 11    47,083,891.53


Balance unexpended July 1, 1933_                                    $29, 485, 002. 36
Amount allotted from War Department Appro-
  priation Act approved Feb. 23, 1931--         _
                                               -__-   -      $7. 09
Amount allotted from War Department Appro-
  priation Act approved May 28, 1930________             -826. 69
Amount allotted from War Department Appro-
  priation Act approved July 14, 1932---------           -- 172. 26
Amount allotted from War Department Appro-
  priation Act approved Mar. 4, 1933_ 1___1         5, 352, 098. 14
Amount allotted from National Industrial Re-
  covery Act approved June 16, 1933_____--_ 42, 147, 874. 95
Amount contributed under sec. 6 of Flood Con-
  trol Act of May 15, 1928-
    For regular work- -______-          _____--         21, 500. 00
     For Public Works program--___-------__-_            5, 000. 00
Amount contributed for improvement of Missis-
  sippi River under sec. 4 of River and Harbor
Act of Mar. 4, 1915__                                   3, 825. 00
                                                                     47, 529, 306. 23
      Amount to be accounted for                                 77, 014, 308. 59
Deductions on account of United States funds transferred to sur-
plus fund ($393,879.93) ; unexpended balances of contributed
funds returned to contributors ($51,324.54); and adjust-
ment of impounded savings under contributed              funds.
  ($210.23)           -------------------------------------          445, 414. 70

      Net amount to be accounted for    ---------------------                                                76, 568, 893. 89
Gross amount expended------------------- $69,382, 583. 93
Less-
    Reimbursements collected- $22, 303, 990. 73
    Receipts from sales--------     232, 014. 35
                                                - 22, 536, 005. 08
                                                                                                             46, 846, 578. 85

           Balance         unexpended            June 30, 1934-----------------                              29, 722,315.04
1462          REPORT OF CHIEF OF ENGINEERSI                                         U.    S.    ARMY,         1934

Outstanding liabilities June 30, 1934 ____.-                                       $3, 448, 143. 29
Amount covered by uncompleted contracts_                                           11, 007, 271. 38
                                                                                                             $14, 455, 414. 67

      Balance available June 30, 1934 ________________________                                                15, 266, 900. 37
Accounts receivable June 30, 1934__ __________________________                                                    800, 313. 77

          Unobligated balance available June 30, 1934 ________                                           _    16, 067. 214. 14

Amount unappropriated under authority of sec. 1 of the Flood
Control Act approved May 15, 1928___          - __
                                                  -__                                                         67, 846, 576. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1936-for new work and maintenance 1___________                                                      15, 000, 000. 00

               EMERGENCY WORK ON TRIBUTARIES OF MISSISSIPPI RIVER

   Under section 7 of the Flood Control Act approved May 15, 1928,
the appropriation of $5,000,000 was authorized as an emergency
fund to be allotted by the Secretary of War on the recommendation
of the Chief of Engineers, in rescue work or in the repair or
maintenance of any flood-control work on any tributaries of the
Mississippi River threatened or destroyed by flood, including the
flood of 1927.
   The costs and expenditures under the emergency fund during the
year, exclusive of receipts from sales, etc., are summarized below:

                                                                                     Costs                   Net expenditures
     Emergency fund for flood control on tributaries
                 of Mississippi River                                                     Mainte-                        Mainte-
                                                                            New work         nance       New work        nance



               ROCK ISLAND ENGINEER DISTRICT

Repair of levees:
   Iowa River in levee districts nos. 8, 11, and 14,
     Louisa County, Iowa---__----___--------          -_____ $3, 393. 68                                  $3, 393. 68 1--
   Ellison Creek, tributary of the Mississippi River in
     Henderson County drainage district no. 2, Illinois
     (about 7 miles south of Oquawka, Ill.) --.------         1,682. 50                                      1,682.
                                                                                                                  50 -
   Levee district no. 17, Cedar River, Muscatine
     County, Iowa      .....------------------------------ 1, 233.00                                         1,233. 00
   Mississippi-Fox drainage district, Missouri-...       _.- 1, 759. 65                                      1,759. 65
      Total.........-------------....-----------------------........         8, 068. 83                      8,068.83
                 ST. LOUIS ENGINEER DISTRICT

Repair of levees on tributaries of Mississippi River:
   Perry County drainage and levee district no. 2,
     Missouri--------------------------------                           ..                                  $ 51. 84
   Lost Creek drainage and levee district, Illinois ...                                                       77. 50
   Kelly Lake drainage and levee district, Illinois ...................                                       12. 50
   City of Beardstown       drainage  and  levee  district,
     Illinois..._. -. ... . ..-- . ....--.   ----- _-__.------                                              117.  50
Repair of levees on tributaries of Mississippi River:
   South Beardstown drainage and levee district, Illi-
     nois       ---------------------------------                      -----------                          210. 00
   Crane Creek drainage and levee district, Illinois- ...........       ..         -..........-........25.        00
   Mauvais Terre drainage and levee district, Illinois......----------  ..                  .....----------
                                                                                   ..----------              73.75
   Coon Run drainage and levee district, Illinois_..................             ------------------------
   Meredosia drainage and levee district, Illinois__
Repair of levee on Illinois River in Lost Creek drainage
                                                                        -- $1, 114. 50------------3, 265. 38
                                                                                                             25.00

and levee district, Cass County, Ill----...---         -    .---------- 3,110. 48 ..------------ 3, 110, 48
      Total--..........................----------------........----------....                4, 224.98   .. __......._      6, 968. 95
                                                                        1

  1Exclusive         of available funds.
                                  MISSISSIPPI. RIVER                  COMMISSION                      -                                 1463

                                                                                   Costs                            Net expenditures
     Emergency fund for flood control on tributaries
                 of Mississippi River                                                         Mainte-                                Mainte-
                                                                      New work                 nante-
                                                                                               nance             New work             nanee
                                                                                                                                     Mainte-


               MEMPHIS ENGINEER DISTRICT

Repair of levees on St. Francis River in drainage district
no. 25, Dunklin County, Mo_               ___                         $6, 140. 12                           -    $6, 140. 12 ...........
Emergency flood protection on the St. Francis River and
tributaries, Arkansas and Missouri__..________-
Emergency flood protection on the Arkansas River and
                                                     -                  15, 166. 15    --         ..
                                                                                                _____-             16, 336. 85
tributaries, Arkansas________________                                  2, 624. 69                                  2, 685. 55    ------....
Emergency flood protection on the White River and
tributaries, Arkansas..--------------------------2,                       554.51------------2,                       686. 64 -_---
Repair of levees:
    St. Francis drainage district, Clay and Greene
      Counties, St. Francis River, Ark__ --     -
    Drainage district no. 17, Little River, Mississippi
                                                                       61, 268. 90     ------------..             60, 118. 97 ...........
      County, Ark                 --------------..---
                              ..------......                   -- 150,       887. 89        -----------
                                                                                                   148, 648. 47 -----------
    St. Francis River in Cane Island drainage district
      no. 26, Craighead County, Ark       __---------.---               10,186.08                   10,186.08
                                                                                            ..------------
Claim of St. Francis drainage district, Clay and Greene
  Counties, Ark-..._ _----     ..--------                         -
                                                          ---------------   -    -   - ---          10, 967. 04 -----------
Repair of levees in the Village Creek and White River
  levee district, Jackson County, Ark_.__-.___-------                  -4, 770. 89       .....-- 4, 771, 39
Claim of Clarendon levee district, Monroe County, Ark                     3, 584. 63 --- - -          3, 584. 63 -
Repair of levees:
    Levee district no. 7, Conway County, Ark----------                  9,840.52
                                                                              6-2.....98                           9, 840.52
    St. Francis River drainage district no. 17, Craig-
      head County, Ark ------------------.-----------                3,173. 12     .....------------ 3,173.12                     -----------
    Arkansas River in levee district no. 2, Conway
      County, Ark., near Morrilton, Ark--------------                5,254.16 -----..-------         5,254,16                      --..
    Arkansas River in levee district no. 8, Conway
      County, Ark., near Menifee____--- ---------    ~_              1, 015.03 ---   _____-          1, 015. 03                   ---.......
    St. Francis River, levee district no. 4, Dunklin
      County, Mo .----------------------------------                12, 882.93 _---- ---            12, 882.93                    ........--
    White River levee district of Woodruff, Prairie,
      and Monroe Counties, Ark __-              -_____-------------. 4, 768. 74 ......         .     4, 768. 74                  ........---------.
    Drainage district no. 12, Craighead County, St.
     Francis River, Ark____________----_----      -      -    5,315. 06 _---                                       5,315. 06       ---------
    Conway County levee district no. 1, Arkansas
     River, Conway County, Ark             ------------------------                                                     6. 00 ..........
    Arkansas River in drainage and levee district no. 1,
     Pope County, Ark...           ----------                 2, 818.03 _-                           .-            2, 818. 03 ---------
    Arkansas River in Crawford County levee district
     near Van Buren, Ark       ....
                                 -      -______________
                                                    ----   _ 23, 819. 23                                 -         7, 723. 43          _---
           Total -------------------               ---------------    326, 070. 68                               318, 922. 76         --------
              VICKSBURG ENGINEER DISTRICT
Emergency flood work:
   Upper Yazoo and tributaries, Mississippi             ---------
                                                                -512.             34                               4, 000. 00     ....-......
    Ouachita, Black, and Red Rivers, and tributaries,
     Arkansas and Louisiana---- -                                      13, 173. 61 .
Repair to levees on Red River, in Saline levee and drain-
  age district, Avoyelles Parish, La       ----                           968. 02                                  1, 015. 81           -.--
Repair of Roane levee on Tallahatchie River, Talla-
  hatchie and Leflore Counties, Miss ____------------
                                       ..                  _            2, 679. 32                                 2, 695.71               ---
Repair of levees on Yazoo River in Belzoni drainage dis-
  trict, Washington County, Miss___                                     3, 622. 82           -.-.                    622.
                                                                                                                   3..
                                                                                                                   3,622.82
Construction of loop levee, Red River, Garland levee
  district, Miller County, Ark_.. --      -__________________             127. 55 ....---..                          689.63               -
Levee construction on Red River, Miller levee district
  no. 2, Miller County, Ark___--------    -----------------                                                            33. 19
Repair of Red Lake levee, Orton levee district, Little
  R iver C ounty, A rk -_...............- ...   --..
                                                   .. . .               9, 929. 90          . . .-----..           9, 929. 90 ..... -....
Repair of levees in Panola-Quitman drainage district,
  Tallahatchie River, Miss _.........................._                 2, 159. 73           $3, 090. 90           2, 159. 73        $3, 090. 90
      Total ----------         ----              ----                  32,148. 61             3, 090. 90.         24,146.79           3,090. 90
              SECOND NEW ORLEANS DISTRICT

Repair of levees in Red River and Bayou Des Glaises
levee district, Louisiana; south bank Red River below
Moncla, La-- _--------                  ...------
                                          ----....  -  -                  -----               1, 240. 39 --                           1, 240. 39
      Total                  -----------------                       -------                  1,240. 39 ---------                     1, 240. 39
      Grand total -------      ___.
                                 ..                                 366, 288. 12
                                                               .____________________
                                                                                   8, 556.27                     351,138. 38         11, 300.24

                                                                               374, 844. 39                             362, 438. 62
 1464            REPORT OF CHIEF OF ENGINEERS,                                            U. S. ARMY,              1934

                                                   Cost and financial summary
                                                   UNITED STATES FUNDS              (SEC. 7)

Cost of new work to June 30, 1934__________________ ______                                                         $2, 462, 119. 86
Cost of maintenance to June 30, 1934_____..   _____________                                                            515, 937. 97

      Total cost of permanent work to June 30, 1934_--------                                                        2, 978, 057. 83
                                                  -1,671.
Plus accounts receivable June 30, 1934_.-____ ____-__---                                                                         09
      Gross total costs to June 30, 1934__-____-__-------- -                                                        2, 979, 728. 92
                                              -__
Minus accounts payable June 30, 1934 _________________                                                                  27, 757. 52

     Net total expenditures-_-____------                                                                            2, 951, 971.40
Unexpended balance June 30, 1934__--__---                                ---------.....                                396, 331. 32

             Total amount allotted to June 30, 1934-_______-__                                                      3, 348, 302.72

     Fiscal year ending June 30                          1930          1931                 1932            1933              1934

Cost of new work.-------------                      $261, 009. 75   $517, 260. 81    $557, 715.92        $342, 427. 87      $366, 288. 12
Cost of maintenance-----....---.                     306, 287. 68     43, 390. 90         120, 000. 00     24,054. 70          8, 556. 27
         Total cost ....---------------............567, 297. 43      560, 651. 71         677, 715. 92    366, 482. 57       374, 844. 39
Total expended----------------..................     564, 859. 01    569, 635. 30         697, 014. 95    337, 304. 53       362, 438. 62
Allotted.....--..-------------------                 419, 055. 06    425, 698. 83         785, 032. 29    580, 581. 04       407, 001. 88

Balance unexpended July 1, 1933_                                                                                     $351, 768. 06
Amount allotted from War Department Appropria-
tion Act approved Apr. 26, 1934 ____-__-          $25, 000. 00
Amount allotted from War Department Appropria-
tion Act approved July 14, 1932_-- -------  ___-45, 053.00
Amount allotted from War Department Appropria-
tion Act approved Mar. 4, 1933---------------     341, 730. 10
Amount allotted from War Department Appropria-
tion Act approved Feb. 23, 1931.-___ _     ____--   1, 828. 80
                                                                                                                         413, 611. 90
            Amount to be accounted for____________________--___---                                                       765, 379. 96
Deductions on account of transfer of impounded savings to sur-
    plus fund as provided for in acts of Mar. 20, 1933, and
    Mar. 28, 1934--      _________ -__          _--    ____                                                                6, 610. 02

      Net amount to be accounted for-___-_                                                                                   769. 94
                                                                                                                         7_______________-758,
Gross amount expended_______________________                                                  $376, 222.99
Less reimbursements collected_________________                                                  13, 784. 37
                                                                                                                         362, 438. 62

      Balance unexpended June 30, 1934__________________---                                                              396, 331.32
Outstanding liabilities June 30. 1934_____________ _ $27, 933.34
Amount covered by uncompleted cortracts______-       158,294. 17
                                                                                                                         186 227.51

     Balance available June 30, 1934_                                                                         210, 103. 81
                                                                                                      ____________---_-_
Accounts receivable June 30, 1934_________---                                                 - ---------       1, 671. 09

            Unobligated balance available June 30, 1934_ .______---                                                      211. 774.90

Amount unappropriated under authority of sec. 7 of flood-
control act, approved                             May
                          15, 1928___________--------     21.310,709.00
Amount that can be profitably expended in fiscal year ending
June 30, 1936, for new work and maintenance 8 ___          -                                                            499, 400. 00
   1 Exclusive of unallotted balance amounting to $327,364.63 and impounded savings car-
ried to surplus fund amounting to $13,623.65.
   *Exclusive of unallotted balance of $327,364.63.
   &Exclusive : of available funds.
                                          MISSISSIPPI RIVER COMMISSION                                                                    1465
                                                     CONTRIBUTED FUNDS                     (SEC. 7)

Cost of new work to June 30, 1934___
                                   ---             --------
                                           ____-------                                                                               $2, 866.78
Cost of maintenance to June 30, 1934___-----------------------                                                                       ---------
            Total cost of permanent work to June 30, 1934__------------                                                             - 2, 866. 78

Net total expenditures_------------------------------------- 2, 866. 78
Unexpended balance June 30, 1934 ------------------ ----------- 439. 48

            Total amount contributed to June 30, 1934__ -------------                                                                 3, 306. 26

           Fiscal year ending June 30                                 1930             1931              1932              1933          1934

Cost of new work---------------..........                        $2, 079. 22          $167. 04        .-.--------.----------               $620. 52
Cost of maintenance__...__---...................-----.......------------.................------------------
Total expended-----                          2, 079. 22
                                 -----------------           167. 04 ------------------------          620. 52

Contributed--....___-------...------- 2,079. 22                                            167. 04 .....
                                                                                                       _.          . .-- -----           1, 060. 00


Amount contributed in fiscal year 1934-.                                                ------------------                           $1,060.00
                      --------
Gross amount expended________                                                                    _------------                          620. 52

            Balance unexpended June 30, 1934--.. ------------------                                                                      439. 48

CONSOLIDATED COST AND FINANCIAL SUMMARY FOR UNITED STATES AND CONTRIBUTED
                                                               FUNDS         (SEC. 7)

Cost of new work to June 30, 1934____   __          ______----------                                                           $2, 464, 986. 64
Cost of maintenance to June 30, 1934- .    ...-----------------                                                                 - 515, 937. 97
      Total cost of permanent work to June 30, 1934_.........                                                                   2, 980, 924. 61
Plus accounts receivable June 30, 1934-------  -------------                                                                         1, 671. 09
      Gross total costs to June 30, 1934 --------------------- 2, 982, 595. 70
Minus accounts payable June 30, 1934 .__.___     ____        -_____ 27, 757. 52

     Net total expenditures__------------- -------                                                                              2, 954, 838. 18
Unexpended balance June 30, 1934________                                                                                           396, 770. 80
            Total amount allotted and contributed to June 30, 1934____                                                          3, 351, 608. 98

    Fiscal year ending June 30                          1930                  1931                1932                 1933             1934

Cost of new work_.......              _......        $263, 088. 97      $517, 427. 85         $557, 715. 92       $342, 427. 87       $366, 908. 64
Cost of maintenance------------.............          306, 287. 68           43, 390. 90        120, 000. 00         24, 054. 70         8, 556. 27
        Total cost..---------------                   569, 376. 65       560, 818. 75          677, 715. 92        366, 482. 57        375, 464. 91
Total expended               --------..................566, 938. 23      569, 802. 34           697, 014. 95       337, 304. 53        363, 059. 14
                        .......
Allotted and contributed-------                       421, 134. 28       425, 865. 87           785, 032. 29       580, 581. 04        408, 061. 88


Balance unexpended July 1, 1933__---------------------------                                                                       $351, 768. 06
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934_    ___----__
Amount allotted from War Department Appropriation
                                                        $25, 000.00                             __---
  Act approved July 14, 1932___________--     -    __ -45, 053.00
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933__________________ 341, 730. 10
Amount allotted from War Department Appropriation
  Act approved Feb. 23, 1931-------___------------        1, 828. 80
Amount contributed in fiscal year 1934_                   1, 060. 00
                                                                                                                                   414, 671. 90
           Amount to be accounted for_                                   -------                            __-_____                766, 439. 96
1466     REPORT      OF CHIEF OF         ENGINEERS       U.   S. ARMY,   19 3 4

Deductions on account of transfer of impounded savings to sur-
  plus fund as provided for in acts of Mar. 20, 1933, and Mar.
  28,. 1934----------------------------------------------------               $6, 610. 02

Net amount to be accounted for-----------------------------                  759, 829. 94
      Gross amount expended                         $376, 843.51
Less reimbursements collected ---------------------    13, 784. 37
                                                                             363, 059. 14
      Balance unexpended June 30, 1934-_______-__-_______      _             396, 770. 80
Outstanding liabilities June 30, 1934- ------------ $27, 933. 34
Amount covered by uncompleted contracts- -- ___--   158, 294. 17
                                                                             186, 227. 51

     Balance available June 30, 1934 ____         __       ____--            210, 543.29
Accounts receivable June 30, 1934------------------------------                1, 671.09

       Unobligated balance available June 30, 1934-----------            _   212, 214. 38
Amount unappropriated under authority of sec. 7 of Flood Control
Act approved May 15, 1928____________________________           1, 310, 709. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1936, for new work and maintenance 1 ________________              499, 400. 00

ANNUAL REPORT OF THE PRESIDENT MISSISSIPPI RIVER COMMIS-
            SION FOR THE FISCAL YEAR ENDED JUNE 30, 1934

                 OFFICE PRESIDENT MISSISSIPPI RIVER COMMISSION,
                                           Vicksburg, Miss., August 18, 1934.
Subject: Annual Report for 1934.
To: The Chief of Engineers, United States Army.

                             LOCATION AND DESCRIPTION


   The Mississippi River rises at Lake Itasca, Minn., and flows in
a general southerly direction 2,434 miles and empties into the Gulf
of Mexico, La. The project comprises navigation, flood-control, and
correlated works on the Mississippi River from Cape Girardeau,
Mo. (54 miles above Cairo, Ill., gage), to the Head of Passes, La.
 (1,070 miles below Cairo gage); and flood-control works in the
upper Mississippi River from Cape Girardeau, Mo., to Rock Island,
Ill. (430 miles); on the outlets of the Mississippi River, and on its
tributaries up to the limit of backwater effect of the Mississippi
River.
                       OFFICE       OF PRESIDENT   AND   DISTRICTS


   Seven engineer officers of the Army have been detailed as assist-
ants to the president of the Commission of which one is secretary of
the Commission and three are assigned to the waterways experiment
station.
   The river has been divided into five engineer districts as a matter
of convenience in administration, and engineer officers of the Army
are detailed as district engineers in charge thereof. The duties of
the district engineers consist of the prosecution of general surveys,
including field work, reduction and plotting of field notes and maps,

   1Exclusive of available funds.
                   MISSISSIPPI RIVER COMMISSION                  1467
and maintenance of permanent marks pertaining to surveys; main-
tenance and observation of all high-water gages, regular river and
tide gages; discharge and slope observations on the Mississippi
River and its tributaries; preparing plans and specifications; main-
tenance of a navigable channel; and carrying on general construc-
tion and improvement work in accordance with Flood Control Act
approved May 15, 1928, and amendment, under the supervision of
the Chief of Engineers, in their respective districts; and the dis-
bursement of funds allotted by the Chief of Engineers to their
respective districts in carrying out the provisions of the existing
project.
   The district limits for flood-control work are as follows:
   Rock Island engineer district.-Mississippi River from mouth of
Illinois River to Rock Island, Ill., 262 miles. District headquarters
are at Rock Island, Ill.
   St. Louis engineer district.-MississippiRiver, from upper limits
of Memphis district to and including mouth of Illinois River, 176
miles on left (east) bank and 168 miles on right bank. This district
also has charge of all Commission work on the Illinois and Missouri
Rivers. The limit of jurisdiction on tributaries under the act of
1923 is that point where levees designed for protection against tribu-
tary floods would have to be further raised by reason of backwater
from the Mississippi River. In other words, it is the point where
the backwater curve from the maximum Mississippi River flood
meets the maximum flood line of the tributary. On the Illinois
River this point has been fixed at mile 120, near Havana, and on
the Missouri River at St. Charles, Mo. District headquarters are
at St. Louis, Mo.
   Memphis engineer district.-MississippiRiver, from Cape Girar-
deau, Mo., on right bank, and Thebes, Ill., on left bank, to the
south bank of Arkansas River, 450 miles on right bank; and to
Coahoma-Bolivar County line, Mississippi, 407 miles on left bank,
of which Cape Girardeau to Cairo, 54 miles on right bank, and
Thebes to Cairo, 46 miles on left bank, is restricted to levee work.
This district has charge of all commission work on the following
tributaries: Ohio River to mouth of Cache River (act, July 27,
1916); to above Shawneetown, Ill. (backwater limit); White River
to Peach Orchard Bluff, Ark. (backwater limit) ; St. Francis River
to the mouth of the Tyronza River just above Parkin (backwater
limit) ; and the south bank of the Arkansas River to the line between
secs. 10 and 11, T. 7 S., R. 5 W., fifth principal meridian, near Lake
Point, Ark. (backwater limit), to division line between Lincoln-
Jefferson Counties, Ark. (act July 27, 1916). District headquarters
are located on Government reservation at West Memphis, Ark.,
opposite Memphis, Tenn.
   Vicksburg engineer district.-MississippiRiver, from lower limits
of Memphis district to Warrenton, Miss., 210 miles on right bank
and 244 miles on left bank. Headquarters are at Vicksburg, Miss.
This district has charge of all Commission work on the Arkansas
River (south bank), Yazoo River, Ouachita River, and the north
bank of the Red River, as follows: On the south bank of the Arkansas
River to a point one-half mile downstream from Pine Bluff city
limits (adopted project limits, act May 15, 1928); on the Yazoo
1468      REPORT OF CHIEF OF ENGINEERS,                  U.   S. ARMY,   1934


River to the mouth of Wolf Lake above Yazoo City (backwater
limit) ; on the Ouachita River to vicinity of Lock and Dam No. 8,
mile 330, above mouth of Red River (backwater limit); and on the
Red River to Alexandria, La. (backwater limit), exclusive of works
on the south bank.
   Second district, New Orleans.-Mississippi River, Warrenton,
Miss., to Head of Passes, La., 461 miles. District headquarters are
at New Orleans, La. This district has charge of all Commission
work on south bank of Red River extending upstream as far as
Boyce, La., thence along Bayou Jean de Jean to Hotwells, La.
 (adopted project limits, act May 15, 1928). The Atchafalaya River
from the head to Morgan City is affected by overflow from the
Mississippi and all of this basin is within the geographical limit
of this district.
                                  PREVIOUS PROJECTS

   See page 1944, Annual Report for 1932.
                                   EXISTING PROJECT

  The existing project is set forth in the Flood Control Act approved
May 15, 1928, as published in the Annual Report of the Chief of
Engineers, United States Army, for 1929, page 1924.
  The work proposed includes:
   1. Flood protection by construction, extension, and repair of levees, and in
certain localities construction of spillway and floodways, from Rock Island,
Ill., to Head of Passes, 1,552 miles; and also upon the tributaries and outlets
of the Mississippi River insofar as they may be affected by the flood waters of
the Mississippi River, in cooperation with the several States and levee boards.
  The essential features of the plan are as follows:
  A floodway opposite Cairo, Ill., from Birds Point to New Madrid, Mo.
   Protection levees in the basins on the west side of the Mississippi River
below the Arkansas River to protect the better lands in these basins and prevent
the excess flood waters of extraordinary floods from spreading over the entire
area of these basins, whenever conjectural floods of the future contain more
water than can be safely carried by the leveed channel of the main Mississippi
River. Excess waters escape out of the main channel naturally at the heads of
the Tensas and Atchafalaya Basins where existing levee protection is not
sufficient to prevent such escapage.
  A controlled spillway to hold the levels down to safe stages at and near
New Orleans.
  Greater protection against crevasses by reason of the strengthening and rais-
ing of main river levees except at the heads of the Tensas and Atchafalaya
Basins.
  The progressive revetment of caving banks to protect the foundation of the
levees and to stabilize the river both for flood control and navigation.
  Improved navigation channels for river traffic, not less than 300 feet wide
and 9 feet deep, to be obtained by dredging and training works where necessary
between Cairo and New Orleans.
  2. Continuation of improvement below the mouth of the Ohio River so as to
"give safety and ease to navigation " on the Mississippi River at all stages by
facilitating the interchange of traffic, " commerce, trade, and the Postal Service,
with a view to securing a permanent channel depth of 9 feet" by means of:
   (a) Revetment of caving banks and contraction work to " correct, perma-
nently locate, and deepen the channel, and protect the banks of the Mississippi
River ", and for the preservation of harbors and the security of levees.

  1Revised,   using latest mileage upper Mississippi River.
                          MISSISSIPPI RIVER COMMISSION                       1469
   (b) Dredging, for the purpose of maintaining at all stages a navigable chan-
nel 300 feet in width and 9 feet in depth, including construction, operation, and
maintenance of suitable dredge boats and auxiliary devices and appliances there-
for. Dredging is also carried on for the creation and maintenance of harbors
and connecting channels.
   3. The maintenance of a navigable channel between the waters of the Missis-
sippi, Red, and Atchafalaya Rivers.
  4. Physical investigations: Maintenance of gages and discharge measurements
of the Mississippi River and its tributaries, preparation and publication of
maps and physical data; surveys and investigations covering all phases of river
regimen governing the work of channel improvement and flood control "from
the headwaters of the Mississippi River to Head of Passes."
   5. Other miscellaneous details incident to the execution of the general project.

                     RECOMMENDED       MODIFICATION OF PROJECT

   See page 1448 this report.
      REFERENCES TO PUBLISHED ARTICLES NOT PREVIOUSLY REPORTED

   See page 1448 this report.
                                 LOCAL COOPERATION

   See page 1959, Annual Report for 1932 and page 1448 this report.
   The net total amount contributed for work under supervision of
the Mississippi River Commission to June 30, 1934, amounted to
$20,663,206.91, of which $19,315,214.64 was for the old project and
$1,347,992.27 for the new project. Of the total contributed for the
new project ($1,347,992.27), $1,342,992.27 was contributed for work
paid for from regular United States funds and $5,000 for work paid
for from National Industrial Recovery Administration funds.
                                TERMINAL FACILITIES

  See page 1449 this report.
OPERATIONS AND RESULTS DURING FISCAL YEAR AND CONDITION AT END
                        OF FISCAL YEAR

   Surveys, gages, and observations. (See p. 1961, Annual Report for
1932).-Topographic and hydrographic surveys of the Mississippi
River have been made and charts published prior to fiscal year 1934.
   Surveys and reports required under sections 3, 6, and 7 of the May
15, 1928 act are made as required. Surveys required under section
11 of Flood Control Act were completed in 1931 and reports sub-
mitted. During fiscal year 1934 surveys were continued in connec-
tion with construction work in carrying out the provisions of the
flood-control project.
  A line of levels along Mississippi River between Tiptonville,
Tenn. (87 1), and Richardson's Landing, Tenn. (185), on left bank
and between Craighead Point (172) and Island 40 (216) on right
bank was completed. A precise level survey in the Boeuf and
Black River Basins and along the Mississippi River in thle Vicks-
1'Figures   in parentheses denote distance in miles below Cairo.
1470   REPORT OF CHIEF OF ENGINEERS,       U.   S.   ARMY,   1934


burg district was begun. A line of first order levels, with perma-
nent marks, was run in the Atchafalaya Basin from Krotz Springs
to Butte La Rose and thence along upper Grand River and Bayou
Plaquemine to Plaquemine, La. (863), with a branch to Bayou
Chene. A first order level line on Mississippi River from Delta
Point, La. (600), to Torras, La., near mouth of Old River (772)
was begun. Floodway, levee, revetment, dike, and construction sur-
veys were made as required; surveys were made over important
works and along caving banks. Hydrographic surveys were made
on Mississippi River from Cairo, Ill. (0.0) to Hickman, Ky. (36),
Kentucky Point, Ky. (68) to Point Pleasant, Mo. (81); Huffman
Landing, Ark. (130), to Barfield, Ark. (143); Island 30 vicinity
 (164) ; vicinity Randolph, Tenn. (183); Island 35 (187); and foot
of President's Island (236) to mouth of Arkansas River (399); and
completed from Arkansas City, Ark. (437), to Reid-Bedford, La.
 (609); and completed from Vicksburg, Miss. (602), to mouth of
Old River, La. (772), including a resurvey from Race Track Tow-
head .(606) to the foot of Davis Island (634). A hydrographic
survey of the Atchafalaya River, extending from the head to a point
10 miles below Butte La Rose, La. (67 miles below head), begun in
June 1933, was completed and a similar survey commenced.
    Aerial surveys, Mississippi River, were made at Island 35 (187);
at Point Pleasant Reach (81 to 85); and continued from Vicksburg,
Miss., to Head of Passes, La. (1,070); and of the Atchafalaya Basin.
    Numerous special surveys and observations on discharge, velocity
and direction of flow were made in connection with progress of cut-
offs at Leland (472), Worthington Point (506), Willow Point (564),
Marshall Point (587), Diamond Point (614), Yucatan Point (639),
Giles Bend (Cowpen Point) (690), Glasscock Point (723), Missis-
sippi River and at Butte La Rose, Cow Island, and Bayou Chene
cuts and other rectification works in the Atchafalaya Basin. A sys-
tem of special gages is read in connection with the surveys and ob-
servations. Aerial surveys were made of the Mississippi River cut-
off locations.
    Gages have been established and maintained at various places on
the Mississippi River and tributaries, on Lake Pontchartrain, and
the Gulf of Mexico; and readings published from earliest records to
1932. During the year the regular gages on Mississippi River and
tributaries and outlets and on Lake Pontchartrain, gages in back-
water areas, Biloxi tide gage in Gulf of Mexico and high- and
low-water gages on Mississippi River were maintained. The regu-
lar- and low-water gages were read during the year and low-water
slope profiles obtained; special gages established in connection with
cut-off observations and channel realignment studies were read. The
moderate stages prevailing during the 1934 high-water period did
not necessitate reading the high-water and backwater gages. Due
to lack of funds, observations of several regular gages was discon-
tinued during August and September 1933. Two regular gages of
the automatic tide-gage type were installed in Grand Lake, and
readings commenced.
   Discharge and other observations on Mississippi River and trib-
utaries at various stations are made each year and the results have
been published for 1838 to 1930. Physical data are compiled and
card indexed. Discharge, slope, and sediment observations were
                                MISSISSIPPI RIVER COMMISSION                                                   1471

taken at selected stations on the Mississippi River and tributaries
from September 1928 to June 1929, and the results published. A
series of measurements of current velocity at each tenth of sounded
depth from surface to the bottom were also made at each station.
During the fiscal year 1934 discharge observations were made at 7
regular stations on the Mississippi River and at 10 regular stations
on tributaries and outlets, and a series of measurements of current
velocity at each tenth of sounded depth from surface to the bottom
were made at 3 of the Mississippi River stations and at 4 of the trib-
utary stations. Discharge observations were also taken at other
selected locations in the lower alluvial valley of the Mississippi
River.
    The costs and net expenditures for surveys, gages, and observa-
tions during the 12 months ending June 30, 1934, were as follows:
                                                                      Regular funds             National Recovery
                                                                                               Administration funds
                          District

                                                                   Costs         t Nex-           osts        t Nex-
                                                                                penditures                   penditures

Rock Island engineer district__________________ ______          $237. 53           $237. 53   __________ ________-
St. Louis engineer district_________
Memphis engineer district__
                                                ___________ 1-3, 926. 19
                                   ____________________       57, 720. 47
                                                                                  3, 340. 58 _____.______     ---.
                                                                                 53, 081. 93 ____________-----......
                                                                                                                     . .

Vicksburg engineer district-----------------_,_
Second New Orleans engineer district_____________
                                                      -      164, 420. 50
                                                             168, 231. 71
                                                                                166, 116. 78   $6, 985. 87
                                                                                165, 667. 42 .___________    -......
                                                                                                             $5, 666. 63


      Total...     .........----------------------------------   386, 684. 02   388, 444. 24    6, 985. 87      5, 666. 63

  1 Minus cost is accounted for by reducing current fiscal year cost instead of total cost to June 30, 1933,
although the decrease is applicable to prior fiscal year costs. This is necessary to balance on form no. 90.

   The net total expenditures for surveys, gages, and observations to
June 30, 1934, amounted to $6,968,455.77, of which $2,749,781.88 was
expended for the new project and $4,218,673.89 on the old project.
   Alluvial valley mapping.-Contoured maps, alluvial valley, lower
Mississippi River, scale 1: 250,000, of the St. Francis, Yazoo-Tensas,
and Atchafalaya-Pontchartrain Basins were published in 1929 and
are now in process of revision; a contoured map, scale 1: 500,000, of
the alluvial valley, lower Mississippi River, from Cape Girardeau,
Mo., to Gulf of Mexico, was published in 1931 and is now being
revised. Data relative to existing maps were collected and surveys
made during 1929 to 1933 for use in the publication of a contoured
map of the alluvial valley, lower Mississippi River, on a scale of
1: 62,500; of the 1851/ quadrangles originally authorized for this
map under the alluvial valley mapping project, and 17 quadrangles
later authorized, 1723/4 quadrangles were assigned the War Depart-
ment (Mississippi River Commission).          These quadrangles have
been completed and forwarded to the printer for reproduction, all
of which have been published as advance sheets, scale 1: 62,500, thus
completing the quadrangle mapping required under the May 15, 1928,
act, assigned to the War Department; the area covered by the 1723/4
quadrangle assigned to the War Department is available on 177 sheets;
the process of editing and correcting the published advance sheets
was continued during fiscal year 1934. Of the 2021/ quadrangles
within the alluvial valley map, 293 quadrangles were assigned for
mapping to the Geological Survey for the War Department, of
         91536-ENG 1934-               93
1472         REPORT           OF CHIEF OF                ENGINEERS, U.                 S.   ARMY,         1934

which 26 quadrangles have been completed for reproduction and are
available as advance printed sheets, scale 1: 48,000.
  There were no expenditures nor costs under appropriation for
National Industrial Recovery Act for alluvial valley mapping dur-
ing the fiscal year 1934. The costs and net expenditures for alluvial
valley mapping incurred under regular funds during the 12 months
ending June 30, 1934, were as follows:

                                                                                                       Regular funds
                                            District
                                                                                                     Costs         Net expend-
                                                                                                                     itures

Memphis engineer district---.......--..----------       ----------------------------....                $793. 87      $2, 378. 41
Vicksburg engineer district- .............----------------------------------...------..              38, 833. 43      38, 824. 38
Second New Orleans district     ------------              ......                                      4, 926. 38
                                                                       ....-----------------------------.....          4, 918. 99
       Total ........--------------------------------------------------------------                  44, 553.68       46. 121. 78



   There were no transfers of funds to the Department of Interior,
Geological Survey office, for use in performing mapping in the lower
Mississippi Valley during fiscal year 1934. The net expenditures
for alluvial valley mapping (all new project) to June 30, 1934,
amounted to $1,191,799.85, which includes $330,942.72 transferred
to Department of the Interior, Geological Survey office, for direct
expenditure by that office.
    General stage of the river during the 12 nonths ending June 30,
1934.-Moderate to low stages prevailed in the Mississippi River
during the fiscal year 1934. The stages exceeded bank-full stage
from 1 to 2 feet for a few days in April 1934, between College Point,
La. (913)1, and Chalmette, La. (980) ; at gagle stations between
Cairo, Ill. (0.0), and Donaldsonville, La. (895), the 1934 crest stages
were from2 to 8 feet below bank-full stage. Crest stages during the
1934 high-water period occurred during the middle of March from
Cairo to Helena, Ark. (307), and from the first to the middle of
April from Sunflower Landing, Miss. (354), to Fort Jackson, La.
 (1,051). The 1934 crest stages were from 6 to 20 feet below the crest
stages of 1929. The 1934 crest stages were immediately followed
by notable minimum stages for that part of the year at a number
of gage stations. Gage readings and dates of the low stages at some
of the principal stations were: Cairo, Ill (0.0), 7.2 feet, June 6;
Memphis, Tenn. (227), 2.8 feet, June 8; Helena, Ark. (307), 4.2 feet,
June 9; Vicksburg, Miss. (602), 4.4 feet, June 12-13; and Angola, La.
 (771), 6.7 feet, June 15, 1934. As a result of the existing drought
conditions prevailing on the tributaries of the Mississippi River,
principally western rivers during fiscal year 1934, the gage records at
Vicksburg. indicate' that the stages prevailing in May, June, and
July 1934 broke previous record low stages during these months.
Moderate to low stages prevailed on all tributary streams during the
fiscal year. The Mississippi River and tributary levees were not
endangered at any time as a result of the progress made in flood-
control work during the past 6 years. No record annual minimum
or maximum stages were established during the fiscal year on the
  1 Figures in parentheses denote distance in miles below Cairo.
                       MISSISSIPPI RIVER        COMMISSION        1473
lower Mississippi or tributary streams. The following gives a gen-
eral outline of the stages at principal gaging stations, Mississippi
River from Cairo, Ill., to Carrollton, La.
   The stage of the Mississippi River was above 20 feet on the Cairo,
Ill., gage (0.0), December 22 to 30, 1933, and January 11 to 20 and
March 4 to May 2, 1934, totaling 79 days; above 30 feet, March 8
to 20 and March 28 to April 8, 1934, totaling 25 days; above 40 feet,
March 14 to 17, 1934, totaling 4 days; the highest reading for the
12 months ending June 30, 1934, was 41.2 feet on March 16, 1934,
and the lowest, 6.2 feet on October 22, 1933.
   At Memphis, Tenn. (227)1, gage readings were below mean low
water, 3.12 feet, October 22 to 25, November 4 to 8, 16 to 26, and
December 4 to 5, 1933, and February 21 to 27 and June 8, 1934. The
highest reading for the 12-month period was 30.2 feet, on March 19,
1934, and the lowest, 2.2 feet, on October 24, 1933.
   At Vicksburg, Miss. (602), the highest stage for the fiscal year,
35.3 feet, was recorded on April 13 and 14, 1934, and the lowest,
2.8 feet, on November 29 and 30, 1933.
   The stage of the Mississippi River was above 10 feet on the
Angola, La., gage (771), July 1 to August 30, September 9 to 22,.
and December 24 to 31, 1933, January 1 to February 21, March 3
to June 3, June 19 to 21, and June 28 to 30, 1934, totaling 233 days;
above 20 feet, July 1 to 4, 1933, and January 1 to 6, 19 to 29, andi
March 11 to May 13, 1934, totaling 85 days; above 30 feet, March 18
to April 26, 1934, totaling 40 days. The highest reading for the
12-month period was 36.6 feet, on April 15 and April 16, 1934; and
the lowest, 4.4 feet, from November 29 to December 1, 1933.
   The highest stage on the Carrollton, La., gage (967) during the
12-month period was 12.5 feet on April 16, 1934, and the lowest
0.4 foot on November 27 and 28 and December 7, 1933.
   Dredges and dredging.-When it became apparent that channel
improvement by contraction works could not meet the pressing needs
of commerce within a reasonable time limit, experiments were com-
menced looking to channel maintenance during low water by means
of hydraulic dredges of large capacity. The development of an
efficient dredge to operate in an open channel exposed to shifting
winds and the river currents, that would quickly open a cut through
the crest of a sand bar from one pool to the next, required a great
deal of experimental work, covering not only the hydraulic and
mechanical details but also the practical manipulation of the dredge
under the conditions imposed. A long series of experiments was
made to determine the best form of suction head; the economic
size of suction and discharge pipes; the velocity of flow in these
pipes; the percentage of material that could be pumped and deliv-
ered; the best type of pump, number and shape of blades, speed of
pump revolutions; anchor piles and hauling cables; pontoons for
supporting the discharge pipes, etc. The proper manipulation re-
quired an intimate knowledge of sand-bar formation and the trend
of the current between successive pools, which could only be gained
by hydraulic experiments and by long-time contact with the prob-
lem. A new problem in channel adjustment was introduced during
the fiscal year 1932 by the construction of permeable pile dikes as
1 Figures in parentheses denote distance in miles below Cairo.
1474    REPORT OF CHIEF OF ENGINEERS,                   U.   S. ARMY,   1934


explained in more detail under Bank Protection and Regulation,
page 1489.
   As each new dredge was built, an effort was made to eliminate
the defects of its predecessor. The two new dredges, Jadwin and
Burgess, completed in February and March 1934, dig a cut 10 feet
deep and 32 feet wide through a sand bar at the rate of 600 feet per
hour. These two dredges can dredge to a depth of 40 feet and have
sufficient boiler power to operate propelling and pumping machinery
at the same time. A satisfactory type of hydraulic dredge for
Mississippi River Channel dredging has been developed, but studies,
experiments, and improvements are still under way.
   Eight channel dredges and four pump barges are now available for
use during the low-water season, covering about 5 months each year.
One cutter-head dredge is available for harbor work.
   A total of over 66,466,000 cubic yards has been dredged in chan-
nel maintenance on the Mississippi River during the past 6 years.
   The present law requires the maintenance of a channel not less
than 9 feet in depth and 300 feet in width at all stages of the river
except when closed by ice. A navigable channel has been main-
tained since 1895, and a channel of project dimensions has been
maintained since 1902, except as follows:
   For 18 days in 1903 and a few days in 1904 the depths at one bar
were 8 and 8     feet. For a few days there was a depth of between
8 and 9 feet at 5 bars in 1908, 7 bars in 1910, 5 bars in 1914, 2 bars in
1916, 1 bar in 1917, 1 bar in 1920, 6 bars in 1922, 1 bar in 1924, 4 bars
in 1925, 4 bars in 1927, 19 bars in 1930, 14 bars in 1931, and 26 bars
in 1933. For a few days there was a depth of between 7 and, 8 feet
at 1 bar in 1908, 1 bar in 1921, 8 bars in 1924, 12 bars in 1925, 1 bar
in 1927, 11 bars in 1930, and 8 bars in 1931. For a few days at 1 bar
in 1913, 4 bars in 1916, 3 bars in 1918, 1 bar in 1919, 2 bars in 1920, 5
bars in 1921, 8 bars in 1922, 2 bars in 1923, 7 bars in 1924, 7 bars in
1925, 7 bars in 1927, 5 bars in 1930, 1 bar in 1931, and 1 bar in 1933,
the required width was not fully maintained. A channel of project
depth and width was maintained during the low-water seasons of
1926 and 1928. The project depth was fully maintained except at 9
bars in 1929, at 32 bars in 1930, at 14 bars in 1932, and at 28 bars in
1933. The low-water season of 1930 covered the longest low-water
period of record, extending over practically the entire year. For a
few days there was a depth of between 61 and 81/2 feet at 1 bar in
1930, 1 bar in 1931,. a depth of 6 feet at 1 bar in 1932, and a depth of
between 7 and 81/2 feet at 3 bars and a depth of between 7/2 and 8
feet at 2 bars in 1933. A shortage of dredging plant was created by
the sinking of 2 dredges in 1929, which were replaced in 1932, and the
sinking of 1 dredge and the condemning of 1 dredge in 1933, which
were replaced in 1934.

                                 MEMPHIS DISTRICT

  Mississippi River.-During fiscal year ending June 30, 1934, 9
dredges were operated on the Mississippi River in the Memphis dis-
trict from Muscovalley (25)1 to mouth of White River (392), a
  1Figures   in parentheses denote distance in miles below Cairo.
                   MISSISSIPPI RIVER COMMISSION                   1475
total of 31,582,357 cubic yards of material was moved at a total cost
of $1,560,901.08, not including miscellaneous costs noted in detail be-
low amounting to $81,103.05. The above work was divided as
follows :
   Channel maintenance and corrective dredging: During the low-
water season of 1933, ending June 30, 1934, nine dredges were op-
erated on the Mississippi River in the Memphis district from Musco-
valley (25) to mouth of White River (392). A total of 29,996,168
cubic yards of material was moved at a total cost of $1,314,636.51,
not including miscellaneous costs noted below amounting to
$71,640.37.
   (a) Channel maintenance dredging: Nine dredges were operated
on 67 crossings from Muscovalley (25) to mouth of White River
 (392) moving a total of 29,673,173 cubic yards of material at a total
cost of $1,275,870.42.
   (b) Experimental corrective dredging: One dredge was operated
at Keyes Point (165) moving 165,459 cubic yards of material at a
cost of $8,966.92. Resurveys of the previous years' work and plant
alterations were made at a cost of $4,439.54, making the total cost
during the year $13,406.46.
   (c) Channel stabilization dredging: One dredge was operated at
island 35 (196) placing 157,536 cubic yards of material at dikes 4L
and 5L as sand fill at a cost of $29,799.17; 387 cords of brush were
placed at a cost of $3,609.34; and 3,900 lineal feet of dikes 4L and
5L were removed at a cost of $51,533.53; engineering and surveys
amounted to $12,057.96; making a total cost of $97,000.00.
   Miscellaneous dredging: Two dredges moved 1,586,189 cubic yards
of material in connection with snagging and removing obstructions,
revetments, and levees with costs as shown below:
   (a) Snagging and removing obstructions: One dredge was op-
erated in sinking the wreck of dredge B. M. Harrod, which sank
March 12, 1933, at the supply and repair depot, opposite Memphis,
Tenn. (230), moving 109,520 cubic yards of material at a cost of
$14,352.77. This item was charged to cessation of work, B. M.
Harrod. A total of $9,462.68 was charged to dredging for remov-
ing obstructions from the Mississippi River in connection with
dredging operations.
   (b) Revetments (grading banks): One dredge was operated at
New Madrid (72) and Merriwether Bend (88) moving 270,031 cubic
yards of material at a cost of $10,434.27.
   (c) Levee work: One dredge made hydraulic fill at Porter Lake
(259), pumping 1,206,638 cubic yards of material at a total cost of
$221,477.53 for the dredge only.
   Memphis Harbor, Tenn.-One dredge was operated in Memphis
Harbor (227) dredging 423,173 cubic yards of material at a cost of
$55,377.51. For additional dredging in Wolf River (Memphis
Harbor) see annual report Memphis district for fiscal year 1934.

                         VICKSBURG   DISTRICT


  Mississippi River.-During the low-water season of 1933, ending
June 30, 1934, 5 dredges and 4 pump barges were operated on
the Mississippi River in the Vicksburg district from Indian Point
1476      REPORT OF CHIEF OF ENGINEERS,                    U.   S.    ARM1VY,   1934


  (404)1 to Racetrack Towhead (610). A total of 7,893,253 cubic
yards of material was moved at a total cost of $466,132.14. Yardage
and cost do not include cut-off operations. The above work was
divided as follows:
    Channel maintenance dredging: One dredge was operated on one
crossing at Indian Point (404), moving a total of 464,880 cubic yards
of material. One dredge and one pump barge unit were operated
on two crossings at Shipland (548), moving a total of 437,690 cubic
yards of material. The total cost of dredging at these locations was
$41,679.38. No other channel maintenance dredging was necessary
in the Vicksburg district between the mouth of the Arkansas River,
Ark. (399), and Warrenton, Miss. (610). Surveys of river crossings
were made during low stages and channel lines at crossings were
marked by buoys, at a total cost of $43,028.16 (not included in total
cost of dredging).
    Channel adjustment (contraction) dredging: One dredge was
operated at Youngs Point (598) building sand dikes to close off the
right channel, moving a total of 532,400 cubic yards of material at a
total cost of $58,590.38. One dredge and two pump barges were
operated at Walkers Bend (490) opening the pointway channel and
moved a total of 1,169,749 cubic yards of material at a total cost of
$31,466.24. At the end of the fiscal year, the two pump barges were
engaged in building sand dikes at the upper end of Walkers Bend
 (490) closing the bendway channel, and have moved a total of
1,425,030 cubic yards of material at a cost of $38,324.36.
    Agitation dredging: Four pump barges were operated in the
Vicksburg district moving a total of 3,863,504 cubic yards of material
 (2;078,221 cubic yards at Duckport to Delta Point (598-602)1
1,538,688 cubic yards at Racetrack Towhead (606-612), and 246,595
cubic yards at Shipland Point (548), at a total cost of $296,071.78.
    Dredging in connection with cut-offs, Mississippi River, Vicksburg
district.-Corrective dredging to produce cut-offs and thereby
straighten the river and lower flood heights was done at three points
in this district. The plant used consisted of 10 levee machines and
4 pipe-line dredges.
    Leland Neck Cut-off (472.0-483.3) began through natural erosion
on June 3, 1933; the distance across the neck was only 3,900 feet, and
a large blue hole had scoured out in the middle, of the neck by
previous high waters; enlargement of the scours across the connec-
tions at the upper and lower sides of the neck to fix the location was
completed on July 8, 1933; 272,000 cubic yards being removed by
levee machines and blasting, and since that date a continuous flow of
water has passed through the opening. By the end of the fiscal year
1934 the cut-off had increased in width to an average of about 1,200
feet. Discharge near the peak of hligh water on April 9, 1934, was
about 390,000 c. f. s.,2 and by the end of June 1934 was 154,000
c. f. s., or 66 percent of total river flow. The total cost of this cut-off
was $59,311.09, of which $9,038.41 was for clearing and $50,272.68
for yardage moved by levee machines.
    Worthington Point Cut-off (505-513) was opened on December 22,
1933. The length of cut is 3.8 miles. Discharge near the peak of
  1Figures   in parentheses denote distance   in miles below Cairo.
  2C. f. s. denotes cubic feet per second.
                       MISSISSIPPI RIVER COMMISSION                            1477
1934 high water was 21,327 c. f. s. on April 10 and on June 28 was
7,600 c. f. s., or 3 percent of total river flow. Further enlargement
of the cut to secure a channel at low stages was almost complete on
June 30, 1934. The, total yardage to June 30, 1934, at this cut-off
was 10,580,265. The total cost was $849,232.56, of which $33,466.40
was for right-of-way and clearing; 2,986,632 cubic yards moved by 4
levee machines at a cost of $483,989.42, and 7,593,633 cubic yards
moved by 2 dredges at a cost of $331,776.74.
   Willow Point cut-off (564-578)1 was opened on April 8, 1934,
The length of cut is 4.7 miles. Discharge near the peak of the 1934
high water was 67,700 c. f. s. on April 10 and 10,100 c. f. s. on June
29, or 5 percent of the river flow. The total yardage moved at this
cut-off was 7,493,091. The total cost was $832,261.93, of which $31,-
285.75 was for right-of-way and clearing, 2,391,660 cubic yards moved
by 6 levee machines at a cost of $447,641.38, and 5,101,431 cubic yards
moved by 4 dredges at a cost of $353,334.80.
   Marshall Point cut-off (587--593) was opened on March 12, 1934.
The length of the cut is 3.1 miles. Discharge near the 1934 high-
water peak was 84,900 c. f. s. on April 9, and by the end of June,
18,700 c. f. s. or 10 percent of the total river flow. The total yardage
moved at this cut-off was 5,341,908. The total cost was $688,763.97,
of which $53,919.36 was for right-of-way and clearing, 1,840,821
cubic yards moved by 4 levee machines at a cost of $31.5,568.37 and
3,501,087 cubic yards moved by 2 dredges at a cost of $319,276.24.
   The total cost of the four cut-offs in the Vicksburg district for
the fiscal year 1934 was $2,429,569.55; $127,709.92 for right-of-way
and clearing, $1,297,471.85 for material moved by levee machines on
the initial cuts, and $1,004,387.78 for material dredged to complete
the cut-offs.
                       SECOND DISTRICT, NEW ORLEANS

  Mississisppi River and Atchfal aya Basin.--During the fiscal year
ended June 30, 1934, 8 pipe-line dredges, 3 bucket dredges, and 6
drag-line excavators were used on the Mississippi River and in the
Atchafalaya Basin in the second New Orleans district, moving a
total of 36,691,537 cubic yards of material at a total cost of $3,201,-
237.08.2 The above work was divided as follows:
  Channel maintenance dredging, Mississippi River: One dredge
was operated at one crossing at Buckridge (634)1 moving a total
of 208,215 cubic yards of material at a cost of $11,223.72. No other
channel maintenance dredging was necessary in the second New
Orleans district between Warrenton, Miss. (610) and Baton Rouge,
La. (842). Surveys of river crossings were made at low stages and
channel line at crossings was marked by buoys.
  Channel stabilization dredging, Mississippi River: Six agitator
dredges and 2 pipe-line dredges were used in removing 14,041,570
cubic yards of material at a total cost of $305,598.71, from bars and
crossings between Warrenton, Miss. (610) and Smithland Crossing
(775) in the second New Orleans district. Approximately two-thirds
of the above total yardage was removed between (miles 712 and 722)
  1 Figures in parentheses denote distance in miles below Cairo.
  2Includes  $579,909.15 construction of agitator dredges and $81,330.23 reduction   in
book value of steamer Mississippi.
1478    REPORT     OF CHIEF OF        ENGINEERS,      U.   S.   ARMY,     19 3 4

Ford and Esperance Crossings. The remainder of the dredging was
divided between six bars and crossings as follows: Racetrack Tow-
head (610) 1,363,000 cubic yards, Togo Crossing (631) 1,036,015
cubic yards, Buckridge Crossing (635) 2,529,781 cubic yards, Brooks
Crossing (637) 90,000 cubic yards, Waterproof Crossing (678)
305,200 cubic yards, and Smithland Crossing (775) 45,825 cubic
yards. In addition to dredging operations, surveys of river crossings
were made at low stages and channel line at crossings was marked
by buoys.
   Dredging in connection with cut-offs, Mississippi River: Correc-
tive dredging to produce cut-offs and thereby straighten the river
and reduce flood heights, was done at three points in the district.
The plant used consisted of 5 agitator dredges, 5 drag-line excava-
tors, 4 pipe-line dredges, and 1 bucket dredge. A total of 14,609,990
cubic yards of material was moved, as follows:
   Diamond Point cut-off (613)1, a dredged cut 9,500 feet long, was
opened on January 8, 1933. During the fiscal year 422,864 cubic
yards of material were moved by agitator dredges in this cut. On
April 16, 1934, near the high-water peak, the discharge through the
cut-off was 326,600 cubic feet per second or about 38 percent of the
total discharge of the river. On May 15, 1934, the discharge through
the cut-off at a much lower stage was 146,500 cubic feet per second,
or about 46 percent of the total discharge of the river. This cut-off
is now being used by traffic at all stages of the river.
   Cowpen Point (Giles Bend) cut-off (690) was opened to high-
water flow on May 25, 1933. During the fiscal year 1934, 5,373,447
cubic yards of material were moved in this cut, which is 10,000 feet
in length. The plant used in this connection consisted of 3 pipe-line
dredges, 1 bucket dredge, 1 agitator dredge, and 2 levee machines.
On April 14, 1934, the discharge through the cut was 16,124 cubic
feet per second. Further dredging will be necessary here to provide
flow during low-water stages.
   Glasscock cut-off (723), with a dredged cut 20,800 feet in length,
was opened March 26, 1933, providing a channel only at high-water
stages. During the fiscal year 1934, 8,813,679 cubic yards of ma-
terial were moved in this cut-off by 3 pipe-line dredges, 4 agitator
dredges, and 5 levee machines. This cut-off does not yet provide a
channel for navigation. Further deepening will be required to se-
cure flow during low-water stages. On April 14, 1934, near the
high-water peak, this cut was discharging about 24,400 cubic feet
per second.
   The total cost in the second district, New Orleans, for channel and
corrective dredging on the Mississippi River, was $2,140,471.67 2
which also includes the cost of general operations in connection with
the cut-offs. The total yardage moved under this heading was
28,859,775 cubic yards.
   Dredging, Atchafalaya Basin: Dredging operations were carried
on in the lower Atchafalaya Basin for the purpose of developing 3
main channels through the swamp section. The plant used consisted
of 3 agitator dredges, 3 pipe-line dredges, and 2 bucket dredges.
  1Figures in parentheses denote distance in miles below Cairo.
  2 Includes $81,330.23 reduction in book value of steamer Mississippi.
                       MISSISSIPPI RIVER       COMMISSION         1479
Some of the more noteworthy projects with yardage moved at each
location include the following: Butte La Rose cut (64)1 (opened
Mar. 20, 1933) was deepened and widened, entailing the handling of
991,824 cubic yards of material; Little Devil cut (75.2)1 743,579
cubic yards; Splice Island and Splice Island Chute (79)1 1,131,589
cubic yards; and Tensas Bay (75 to 77) 650,300 cubic yards moved
by agitator dredges. In addition to the above, a total of 1,175,418
cubic yards of material was moved from eight other locations in
improving the Atchafalaya Basin channel.
   The Bayou Chene and Cow Island cuts were deepened and widened
during the fiscal year 1934, using 3 pipe-line dredges, 1 bucket dredge,
and 2 levee machines, 2,424,805 cubic yards of material were re-
moved, as stated below:
   Bayou Chene cut (81.9)1 opened March 4, 1933, was widened and
deepened, 1,739,174 cubic yards of material being removed. On
March 25, 1934, when the Melville gage was reading 30 feet mean
Gulf level, the main channel above Bayou Chene cut was discharging
55,000 cubic feet per second, 24,000 cubic feet per second, or approxi-
mately 44 percent of the total, being discharged through the cut.
On May 24, 1934, with the Melville gage reading 15 feet mean Gulf
level, the main channel was carrying 39,000 cubic feet per second,
and the cut was discharging 16,000 cubic feet per second, or approxi-
mately 41 percent of the total discharge.
   Cow Island cut (71.5),' a dredged channel 2,000 feet in length,
was cut through December 23, 1932. In enlarging this cut, 685,631
cubic yards of material were removed in the fiscal year 1934. On
March 25, 1934, when the Melville gage was reading 30 feet mean
Gulf level, the main channel above Cow Island cut was discharging
87,000 cubic feet per second; 37 percent of this total, or 32,000 cubic
feet per second, was being carried by the cut. On May 24, 1934,
with the Melville gage reading 15 feet- mean Gulf level, the main
channel was discharging 54,000 cubic feet per second, while the
cut was carrying 33,000 cubic feet per second, or 61 percent of the
total discharge.
   Sand traps in the Atchafalaya Basin were made at three locations,
Cowpen Bayou spillway (mile 7.7 below head of Grand River),
Lake Long (mile 2.7 below head of Lake Long), and Grand River
 (miles 5.7 and 6 below head of Grand River). A total of 714,247
cubic yards of material was moved in connection with these sand-
trap projects by two bucket dredges.
   The total yardage moved in connection with improvements in the
Atchafalaya River Basin totaled 7,831,762 cubic yards, at a total
cost of $1,060,765.41, which includes the cost of general operations
in connection with developing this channel.
   Borings and soil analyses.-Comprehensive subsurface and sub-
aqueous exploratory borings and soil analyses were made at various
localities during the year in the second New Orleans district, to
obtain information regarding the location and development of cut-
offs and stabilization of other channels. Special equipment for this
purpose was designed and used with marked efficiency and success.
  1Distance in miles below head of Atchafalaya River.
1480       REPORT OF          CHIEF OF ENGINEERS,                     U.    S. ARMY,          1934


   Old River, La.-Dredging in the vicinity of the mouth of Old
River, La. (772 miles below Cairo) was done during the fiscal year
1934 by the Vicksburg district as follows: Dredge Todd, October
1-5, 1933, moving 31,941 cubic yards at a cost of $3,207.17, from
allotment, removing obstructions; dredge Waterway, June 9-15,
1934, moving 50,472 cubic yards at a cost of $3,593.33 from allotment,
maintenance and improvement, Red River, La.
   Experimental dredging to determine the feasibility of training
channels by early dredging, prior to the low-water stage, and thus
prevent the difficulties encountered at that time has been undertaken
by the Memphis district. In the Vicksburg district there has been
less trouble with low-water navigation during the past 4 fiscal years
than in previous years, notwithstanding the low stages that prevailed
during the low-water seasons. In 1930 a system of frequent surveys
of river crossings and markings of channel line at the crossing by
buoys was inaugurated. This system is probably responsible in
large measure for less navigation trouble than in years of higher
low-water stages. Another favorable feature was the absence of
sudden minor rises or freshets during the low-water season. Such
rises cause fills in the channel crossings, these being scoured out as
the freshet subsides or a new channel formed; in either case there is
an interval of difficult navigation.
   The costs and net expenditures for dredging during the 12-month
period ending June 30, 1934, were as follows:

                                                   Regular funds                          Recovery Adminis-
                                                                                Nationaltration funds

                District

                                             Costs           Net expendi-          Costs           Net expendi-
                                                                tures                                  tures

                           ...
Memphis engineer district _____________ $1, 517, 683. 29     $1,755,398.04
Vicksburg engineer district_............ 39, 670. 84             52, 142. 60    $2,836,390.  60     $2, 728, 190. 57
Second New Orleans district-----------      222, 452. 83        638,553. 18      2,398, 875. 10      2, 263, 800. 39
      Total----_-----_ _-------            1, 779, 806. 96    2, 446, 093. 82    5, 235, 265. 70     4, 991, 990. 96


   The net total expenditures for dredging to June 30, 1934,
amounted to $34,140,648.01, of which $20,641,081.62 was expended on
the new project and $13,499,566.39 on the old project.

                                   CONDITION OF CHANNEL

   Except when blocked by ice and during other rare and brief
periods, there is generally in the Mississippi River below Cairo a
good continuous navigable channel with a depth of 9 feet or more
and a width of at least 300 feet for a distance of 842 miles and with
a depth of not less than 35 feet and a width of several hundred feet
at all times for the remaining 240 miles to Gulf of Mexico. This
navigable channel is also of ample width and of at least 14 feet
depth below Cairo during 5 to 8 months of each year when high
stages of river prevail.
   The following are depths and widths for the different stretches
of the river below Cairo that can usually be relied upon except dur-
ing the lowest unusual stages:
                   MISSISSIPPI   RIVER COMMISSION                 1481.
   Cairo to Memphis, Tenn., 227 miles, least depth 9 feet for width
of 300 feet. Low-water channel maintained by dredging.
   Memphis to Vicksburg, Miss., 375 miles, least depth 9 feet for
width of 300 feet. Low-water channel maintained by limited amount
of dredging.
   Vicksburg to Baton Rouge, La., 240 miles, least depth 11 feet for
width of 300 feet or more. Low-water channel maintained by a
limited amount of dredging at rare intervals.
   Baton Rouge to New Orleans, La., 133 miles, least depth 35 feet
for width of 300 feet. Channel maintained by the first district, New
Orleans, La.
   New Orleans to Quarantine Station, La., 90 miles, least depth 62
feet for width of several hundred feet. Channel maintained by the
first district, New Orleans, La.
   On June 30, 1934, the ,governing depth to the Gulf through South
Pass was 30 feet, with a minimum width of 500 feet, and a govern-
ing depth of 35 feet, with a minimum width of 600 feet, through
Southwest Pass, both referred to mean low water in the Gulf at the
passes, as reported by the district engineer, first district, New
Orleans, La.
                   SNAGGING AND REMOVING WRECKS

   Expenditures from allotments under appropriation for " Remov-
ing sunken vessels or craft obstructing or endangering navigation,
indefinite (act of Mar. 3, 1899)" are considered to be made under
supervision of the Mississippi River Commission when the expendi-
tures are for removal of wrecks in the Mississippi River or in other
streams as far back as the flood waters of the Mississippi River ex-
tend. No work was done during the fiscal year 1934 in the Vicks-
bur,g or second New Orleans districts in removing wrecks. Of the
$3,000 allotted under this appropriation in fiscal year 1933 to the
Memphis district for removal of wrecked steamer Alabama, $847.44
was revoked May 29, 1934, leaving a balance available of $2,152.56
which was expended during fiscal year 1934. Snagging on lower
Mississippi River in fiscal year 1934 is reported by the district
engineer, St. Paul, Mo.
                 BANK   PROTECTION AND   REGULATION


   Since the adoption of dredging in 1896 the permanent work of
channel improvement has been confined chiefly to the revetment of
banks. The extent of caving bank requiring revetment was, how-
ever, relatively so great when compared to the funds available that
it has been necessary to confine the work to cases of urgent necessity,
such as threatened cut-offs, endangered levees of such large size as
could only be replaced at excessive cost, and the harbor fronts of
cities.
   The construction of works for bank protection on such an extensive
scale and in locations so difficult as those found on the lower Missis-
sippi was at the beginning a problem beyond the experience of engi-
neers. The first experiments included woven-willow mattresses of
different thicknesses varying from 2 to 12 inches, and of different
degrees of compactness, elasticity, and roughness of surface. The
1482    REPORT OF    CHIEF OF   ENGINEERS,    U.   S.   ARMY,   1934


method of operation comprised three, parts: First, the subaqueous
revetment; second, the grading of the bank above the water surface;
third, the upper bank protection. The unsatisfactory woven-willow
mats, with upper bank protection of brush and stone, were followed
by stronger and more durable fascine mats about 16 inches thick,
bound so tightly with wire cables as to be nearly impervious to the
wash of the current through them, the upper bank being paved with
hand-laid rock, or concrete in blocks or in situ.
   On account of the increasing amount of bank revetment for pro-
tection against caving and the decreasing supply of economically
available willows for the construction of mats, it became necessary to
develop some form of mattress that would not require the use of
willows.
   Memnphis district.-Experiments with concrete as a substitute for
the subaqueous willow mats were made from 1914 to 1918. Be-
ginning in 1914, experiments were made in the first and second dis-
tricts (Memphis engineer district) with large sheets of concrete,
125 by 50 feet by 4 inches in thickness, reinforced with wire mesh
and 3/s-inch cables. Later experiments were made in the same dis-
tricts with concrete mats consisting of slabs 240 feet long by 12 feet
wide by 33/4 inches thick, reinforced both transversely and longi-
tudinally with 1/2- by 2-inch steel bars and wire mesh fastenings.
   During the year ending May 31, 1924, 1,100 linear feet of bank were
protected by subaqueous mats of this type. Owing to the excessive
cost and difficulty of placing this type of mat, its further use was
abandoned.
   A type of revetment known as the " lapped-slab concrete revet-
ment " was developed during 1925 to 1927. Mats were formed of
reinforced concrete slabs, 4 inches thick, 6 feet wide, and 11 feet long,
overlapping and interconnected.
   The results of the experimental work during the year ending May
31, 1927, were so encouraging that the district was authorized to
construct a power-operated casting plant and sinking plant with
necessary auxiliary plant embodying the improvements suggested
by the experimental work. This mat was used as the standard con-
crete mattress during the years 1928 to 1931. In March 1931 the
design of the mattress was altered, eliminating the lap between indi-
vidual slabs, the slabs being changed to 10 feet by 6 feet by 4 inches.
In October 1931 the thickness of the slabs was reduced from 4 inches
to 3 inches for further economy.
   The Vicksburg district's articulated concrete mattress unit was
transferred to this district in June and July 1931 and worked the
full season, and approximately 1 month in the 1932 season, when it
was retransferred to Vicksburg district.
   Subaqueous investigation in the Memphis district during the low-
water season of 1931 disclosed faults from various causes in existing
bank protection works. Based on the early findings of the sub-
aqueous investigation, there was initiated in the Memphis engineer
district in September 1931 an intensive study of all metals which
might be used for reinforcing and fastenings, as well as to determine
which of these metals might be practicable for use, both from the
standpoint of prolonged life through corrosion-resistant properties
and a reasonable increase in cost. This step was taken since the sub-
                    MISSISSIPPI RIVER COMMISSION                   1483
aqueous investigation showed that a large percentage of the failures
noted in the bank protection work was caused by failure from corro-
sion of the metal fastenings previously used. The result of these
experiments and investigations indicate the desirability of abandon-
ing the slap type of concrete mattress and the improvement of articu-
lated type mattress by increasing the width of the individual blocks
and by using noncorrosive reinforcing and fastenings of some ma-
terial having corrosion-resisting -properties equal to commercially
pure copper. Preparations were initiated in 1932 for an accelerated
corrosion test, using concentrated waters of the Mississippi River in
order to determine what noncorrosive materials are suitable for use
as reinforcing and fastenings. This test was carried on through
July 1933, when stopped for lack of funds, and due to failure of test
to develop results. Corrosion-resistant wire and strand are used in
the construction of fascine willow mattress; this type of mattress,
however, does not offer possibilities of much reduction of cost nor
increase in length of life, which appear probable with the improved
type of articulated concrete mattress.
    This district retained one of the two sinking plants transferred
from Vicksburg, and with minor alterations to the slab-casting plant
and construction of a mooring barge is equipped to lay standard
articulated concrete mattress. The articulated concrete mattress
was standardized in 1932 and noncorrosive fabric, wire, and fasten-
ings are being used in all work since then. Work was continued on
the design of the articulated mattress and on the types of noncor-
rosive materials for construction.
    Work during the fiscal year ending June 30, 1934, consisted in
placing 16,520 linear feet of new revetment, and 793 linear feet of
pile dikes, the latter protecting 1,700 linear feet of bank con-
structed for bank protection. In addition about 7,428,000 square
feet of mattress and 1,226 linear feet of pile dikes, were constructed
and placed as repairs to and renewals of old revetment work. The
season's work also included revetment surveys. During the fiscal
year 1934, experiments in connection with tetrahedral block type of
bank protection were conducted in the Memphis district; a descrip-
tion of the tetrahedrons is given under Vicksburg district. Work
during the fiscal year 1934 also consisted of the construction and
placing of five permeable pile dikes (aggregate length 4,878 linear feet)
under contraction work program; in addition, 2,980 linear feet of
permeable pile dikes were constructed for repairs to or renewals of
existing works in connection with contraction works in the Memphis
district.
    Vicksburg district.-Experiments were begun in the third district
 (Vicksburg engineer district) in 1915 with concrete mats. These
mats as now built are formed of reinforced concrete slabs 3 inches
thick, 11/2 inches wide, and 3 feet 11 inches long, reinforced and
connected by bracket-type noncorrosive no. 5 wire fabric so designed
that completed mattress will have a unit strength of 4,000 pounds,
per foot and tension in every direction. The units formed with the
above fabric, each 4 feet by 25 feet (100 square feet), are clipped
together with noncorrosive wire clips. Various changes have been
made in the interest of durability and economy, and experiments:
looking to further efficiency are being continued. The amount of
1484   REPORT OF CHIEF OF ENGINEERS,         U.   S.   ARMY,   1934

reinforced concrete mats placed in the Vicksburg district during the
13 months ending June 30, 1929, was 26,435 linear feet; during the
12 months ending June 30, 1930, 14,030 linear feet; during the 12
months ending June 30, 1931, 15,198 linear feet. There was no rein-
forced concrete mat placed during the 12 months ending June 30,
1932. During the 12 months ending June 30, 1933, 14,215 linear
feet of new revetment were placed.
   During the fiscal year 1934 experiments were begun with a new
type of revetment. The river bank was covered with a blanket
of concrete blocks shaped as tetrahedrons, the separate blocks having
an altitude of about 1 foot. The blocks were made by contract
and placed as protection to approximately 2,297,900 square feet of
river bank (includes both new work and repairs).            Above the
water surface the blocks were hand-placed to form a close fitting
pavement using 250 blocks per 100 square feet of area. Below
the water surface the blocks were thrown from barges and dis-
tributed over the area to form a blanket of 250 blocks per 100 square
feet of area. The effectiveness of this type of bank protection is
not yet fully determined because of the short length of time they
have been in use and light attack to which they have been subjected,
due to the comparatively low stages which prevailed during the
winter and spring of 1934.
   Work during the fiscal year ending June 30, 1934, consisted of
placing 5,705 linear feet of new concrete-mattress revetment and
3,000 linear feet of experimental concrete tetrahedral block revet-
ment, constructed for bank protection. In addition, 4,178,200 square
feet of mattress and 729,000 square feet of tetrahedral blocks were
placed as repairs to and renewals of old work. The season's work
also included revetment surveys and repairs to plant. Sand dikes,
constructed by dredging, built during fiscal year 1934 under the
contraction works program totaled 6,500 linear feet. There has
been placed to date in this district a total of 209,346 linear feet of
concrete mattresses for bank protection; and 450 linear feet of
permeable pile dike and 6,500 linear feet of sand dikes in connection
with contraction works.
   Second district, New Orleans.-The concrete revetment unit in use
by the second district, New Orleans, was completed and placed in the
field during fiscal year 1929.
   During the 13 months ended June 30, 1929, a total of 15,843 linear
feet of new revetment (willow mats) was placed in the second New
Orleans district; during the 12 months ended June 30, 1930, 7,857
linear feet of new concrete revetment was placed and 11,610 linear
feet of new willow mats, total 19,467 linear feet; during 12 months
ending June 30, 1931, 1,741 linear feet of new concrete revetment and
1,782 linear feet of new willow mats, total 3,523 linear feet; 155
linear feet of new concrete revetment was placed during fiscal year
1932, and 190 linear feet during fiscal year 1933, and 3,271 linear feet
during fiscal year 1934.
   Extensive experiments, based on the use of asphaltic mixtures,
were carried out during the fiscal year 1933 in the second district,
New Orleans, in an effort to develop a mattress free from openings
with all metal parts embedded in a protective medium. Surveys
along the river between Baton Rouge and the northern limits of the
                   MISSISSIPPI RIVER COMMISSION                  1485
district developed the fact that bar sand of uniform composition, as
well as a deposit known to geologists as ".loess ", which has proven
of value as a filler in asphaltic mixtures, were available in ample
quantities. Exhaustive laboratory tests and studies were under-
taken with these materials to determine the best asphalt mixture
suitable for use in a reinforced asphaltic mattress and a satisfactory
mixture formula was developed. The reinforced asphaltic mattress
is composed of this special asphaltic mixture cast in a series of suc-
cessive launches, welded together to form a continuous unbroken
mattress, in which all cables, reinforcing, and fastenings are com-
pletely embedded and thoroughly protected. Actual working scale
trials of the reinforced asphalt mattress were made in the second
district, New Orleans, during January and February 1933. An
experimental plant was developed to manufacture and sink asphalt
mattresses. About 12,000 square feet of asphalt mattresses were
made and sunk in the Mississippi River at the Engineer depot, New
Orleans. Water of maximum depth of 85 feet, with a current of
5.6 feet per second, was encountered during launching. The mat-
tress was successfully made and launched under all sorts of weather
conditions. Considerable drift was encountered due to rising river,
so that it may be said that general conditions obtaining were quite
severe. The results of the trials were favorable. At the end of the
fiscal year 1933 a full-size plant was under construction with an
expected capacity of 150,000 square feet per day, operating double
shift. The construction of the asphalt revetment unit was completed
and placed in operation during the fiscal year 1934; the asphalt revet-
ment placed was confined to repairs to existing bank-protection work.
Work during the fiscal year ending June 30, 1934, also consisted of
constructing 4,507,600 square feet of mattress, placed as repairs to
and renewals of existing bank-protection work.
   Plans and specifications for contraction work plant for the Mem-
phis district were completed in 1930 and construction thereof
completed during the fiscal year 1931. Plant is available in the
Vicksburg district for contraction work. Studies and surveys in
connection with contraction works on lower river were continued.
   Summary.-Since work began in 1928 under the present flood-
control project provided for in congressional act dated May 15, 1928,
approximately 375,000 linear feet of new revetment for bank protec-
tion covering more than 71 miles of river bank has been constructed
and placed along the Mississippi River below Cairo; under the con-
traction-works program more than 178,000 linear feet of dikes (33.7
miles) have been constructed in the Memphis district; and approxi-
mately 6,950 linear feet of dikes (1.3 miles) have been constructed
in the Vicksburg district under the contraction-works program.
   Work during the 12 months ending June 30, 1934, within the
Memphis, Vicksburg, and second New Orleans districts consisted in
placing 28,496 linear feet of new revetment, and 793 linear feet of
permeable pile dike (the latter protecting 1,700 linear feet of bank),
constructed for bank protection; in addition about 15,364,000 square
feet of mattress, 729,000 square feet of tetrahedral blocks, 749,800
square feet of asphalt revetment, and 1,226 linear feet of permeable
pile dike were constructed and placed for repairs to and renewals of
old revetment work. A total of 5 permeable pile dikes (aggregate
1486           REPORT            OF CHIEF                OF ENGINEERS,                   U.    S.   ARMY,         1934


length, 4,878 linear feet) under the contraction-works program were
constructed; and approximately 2,980 feet of permeable pile dikes
were constructed for repairs to or renewals of existing works in
connection with contraction works in Memphis district; in the Vicks-
burg district 6,500 linear feet of sand dikes were constructed in
connection with contraction work.
  The costs and net expenditures for revetments and contraction
works during the 12-month period ending June 30, 1934, were as
follows:

                                                                    Regular funds                   National Recovery Adminis-
                                                                                                           tration funds
           Allotment and district

                                                               Costs           Net expendi-             Costs          Net expendi-
                                                                                   tures                                   tures


Revetments:
   Memphis district------------------                         $35, 897. 10     -$747, 237. 01       $4, 147, 284. 93     $4, 499. 72. 79
   Vicksburg district-----------------                        330 072. 84         382, 800. 75       2, 918, 340. 98      2, 999, 160. 93
   Second New Orleans district_......                         858, 862. 74        578, 145. 25       1, 272, 714. 96      1, 417, 879. 46
        Total revetments .                                 1, 224, 832. 68        213, 708. 99       8, 338, 340. 87     8, 916, 813. 18
Contraction works:
   Memphis district------------------           293, 525. 79                          59, 515. 61     434, 307. 19   548, 020. 90
   Vicksburg district .........-------------------------------.                        3, 483. 47 ----------------................
        Total contraction works ..-             __   .        293, 525. 79            62, 999. 08       434, 307. 19        548, 020. 90
Grand total...........-----------------------
                                   .. _....                1,518, 358. 47         276, 708. 07       8, 772, 648. 06      9, 464, 834. 08



  There were no expenditures for revetments from contributed funds
during fiscal year 1934. The total expenditure on revetment and
contraction works from 1881 to June 30, 1934, amounted to $138,-
805,792.29 (old project, $76,498,040.20; new project, $62,307,752.09).
This total includes $3,201,987.63 contributed by local interests (old
project, $3,137,219.97; and new project, $64,767.66), but does not in-
clude $353,171.60 expended by the city of New Orleans.
  The following table shows the total length of effective revetment
in place and the amount constructed during the 12 months ending
June 30, 1934:
Effective length of bank protection, June 30, 1934, and length built during
                   12 months, July 1, 1933, to June 30, 1934


                                                                              Below       Bank of riv       Built dur-     Effective
                               Locality                                       Cairo                          ing year      in place



                 MEMPHIS ENGINEER DISTRICT
                                                                              Miles                           Linear feet Linear feet
Below Cache River, Ill. (on Ohio River)_____________                             14       Right---------____________         - 8, 380
Cairo, Ill. (on Ohio River)                      ____                            11        ... do..----------------              - 832
Beckwith Bend, Mo------------------------------                                  33       _---do--------------------          - 4, 818
Hickman, IKy__-----      ------ __--------.                   _ -                 36      Left.-------------                   - 7, 849
Reelfoot Front, Ky--__--      -----                                               40 -_ -do.----    _-_-:_-_-_--_-               14, 137
Bend Island No. 8, Mo __---                 ____........
                                                     .__________                  45 Right _______-__.________                   10, 842
Slough Landing Neck, Tenn
New Madrid, Mo--------------------------------
                                                __--------___________          61-63 Left_____----__      ------------           22, 324
                                                                                  71 Right --------                                4, 450
New Madrid Bend, Mo .                                                          71-75 -    do     _        2 5, 230               19, 518
    Do           ...            .....--------------------------------------    71-75 ---  do...----------------                  3 1, 500
    Footnotes at end of table.
                                             MISSISSIPPI RIVER COMMISSION                                                                                      1487
Effective length of bank protection, June 30, 1934, and length built during
             12 months, July 1, 1933, to June 30, 1934-Continued



                                  Locality                                           Below
                                                                                                  Bank of river                      Built dur- Effective
                                                                                     C airo                                           ing year revetment
                                                                                                                                                 in place
                                                                                                             --      --        '-            --         -




         MEMPHIS ENGINEER DISTRICT--continued
                                                                                      Miles                                          Linearfeet             Linear feet
Merriwether Bend, Tenn-                                                _-_---              88 Left -_______ _                           2 3, 300                       7, 313
     ---
      Do              --   - - - - - - - -
Hathaway Landing, Tenn-......_.................
                                                        - - - - - - - -                    88 __ do ...
                                                                                          105   . do---
                                                                                                                                        4 1, 700                    4 1, 700
                                                                                                                                    ............                     4, 076
Gayoso Bend, Mo----...............................                                   1c
                                                                                      09-110 Right -_____-_                         ............
                                                                                                                                                                    11, 720
Caruthersville, Mo_......__                                                               112 ___ do ---.                                                             2, 342
Bells Point, Mo--- .......                                                  .             114      do..---  .                                                         5, 500
Linwood Bend. Tenn ..._                                                               18-119 Left -......
                                                                                     1(                                                           22, 095           17, 770
Baders Front, Mo_____ ___ ._______..                .        .    _________               121 Right ______                          -------..                       6 8, 200
Island No. 18, Mo---.                 .-                                             1:22-123    - do                               ............                      4, 795
Huffman-Hickman, Ark_______                               ______________              30-132 .... do-
                                                                                     11                                                                             14, 944
Barfield, Ark--------------...............-----                                       42-144 .....-do .
                                                                                     19                                                                             18, 155
Plum Point Reach:
    Daniels Point, Ark_.._.....__                       ____--
                                                        __ ...          ...              152        .. do-.....                                                  (6)
    Ashport, Tenn-----------------                                 ---------
                                                                  55-159 Left                                                                                    (6)
                                                                                                        ............
    Kate Aubrey, Tenn .. _________. ____________                     158 Right-____.-                _                                                               2, 500
    Keyes Point, Tenn__------------------------.                1(59-161 Left           -            _                                                          7   12, 534
    Fletchers Bend, Ark                    _____..................______
                                                                1i60-163 Right __                    -                                                           (6)
    Elmot Bar, Tenn---         ..           --------......       ...
                                                                  62-163         -  do .....                                                                     (6)
     Osceola, Ark ...... . ....                                   ..
                                                                1( 165 -      ..    do--                                                                               5, 823
    Bullerton Bar, Ark-                     _____         ____    66-169 ____do ....
                                                                     ______                                                                                         16, 975
Island 34, T enn.--................................                  178            do ...                            5, 895                      8                    5, 895
Golden Lake, Ark._....................---                            191       -... do.......
                                                                          .......                                                                                (6)
Chute of Island No. 35, Tenn.........                                192 -
                                                                  .....      --     do-
                                                                                  __-.                                                                              9 3, 800
Bend of Island No. 35, Ark                            ____      2( 192 ... do                  _._.. ............                                                (8)
Happy Valley, Ark---- ----------                                  06-207     ... do......              ------.....                                               9 8, 218
Robinson Crusoe Island, Ark_....____                                      ... do-
                                                                     225 __                              -----.......                                               6 744
Hopefield Bend, Ark----...........................                   227            do .......          ............                                             6 2, 700
M em phis, Tenn----....... ........ ......... ....                27-228 Left__ ...            ____ ............                                                 85, 483
Tennessee Chute, Tenn_........____                         .    .__ .__--___
                                                                     231 ..         do...                ............                                           to 1, 000
Bauxippi-Wyanoke, Ark_-                                         2:33-235
                                                                21          Right ____   ...        . ............                                              9 22, 250
Cow Island    Bend,    Ark_               _____                   48-249    .... do...                  ............                                              13, 334
     Do .. ---------------------------                          .-   250
                                                                  _ ..---     ... do ....                  ... --- -
                                                                                                       ...........                                               52, 876
Norfolk, Miss---- .............................                 2.52-253 Left ..               -..         . .               ..
                                                                                                                          . --                                      12, 992
Star Landing, Miss- ......                                      2(55-257 -_do
                                             __.__.._______. ._____       ..            .....              . . . -- --                                               7, 100
Porter Lake, Ark___ _________                                   2.58-260 Right .......
                                                      ._____________                                                  --_--   _                                     13, 560
Polks Landing, Miss__-______                                    263-264 Left ______
                                                            __-__-___-____             ... -                   . . -_ ---                                           12, 094
Mhoon Bend, Miss.-- ........................                         273 ..... do                              . . . . --    .                                         6, 983
W alnut Bend, Ark-----.... ...... ..... ...........                  278 Right ______-_                        _ _ -. ---                                            6, 660
Trotters Landing, Miss___________________                            304 Left...______                                                                              20, 714
         Ark-------
     DoHelena,                    _____
                       -----------------                             305    ..
                                                                         ____do                                                                                     59, 000
H elena, A rk _ .. ....... ..... ___ _ - . ..-.. .. .. .             307 Right ______        -                                                                         6, 014
Delta, Miss________________________-------------                315-316 Left ..                                                                                      7,   195
Friar Point, Miss _____________.........__________...                318 -          do ........                                                                      4,   235
Old Town Bend, Ark--__                  -__-  .___.________.___      325 Right ______                                                                               10,   260
Fair Landing, Ark--------------------_-------_                       336 --.. do                                  8 52,600                                          10,   650
Avenue, Ark -----------------------------------                      346 -. .do . . . . ........                          ...                                       11,769
Sunflower, Miss .. . .            __
                                   .. _                         3154-357 Left _________ ............                                                                10, 420
Knowlton, Ark-------- -- -------------------
                                           __         -     -        366 Right ______ ........ 1,000                     ---
                                                                                                                          ....
                                                                                                                                                                    10, 820
Laconia, Ark--------------------..........__...                      376 ..-_do                                    --
                                                                                                        ............
                                                                                                                      - - -.                                         1, 280
                                                                                                                                          st 3, 600-
                 VICKSBURG         ENGINEER DISTRICT                                                                                        15 2, 600-
                                                                                                                                    ...........


Riverton, Miss -----------------                                                         396     Left .  ----....                                                6 7, 200
Pendleton, Ark. (Arkansas River)_                                     ---                1 50    Right . --....
                                                                                                                                      ..........
                                                                                                                                                                   3, 000
      Do    - --.
               - --        --
Red Fork, Ark. (Arkansas River) -
                                 ------- -   -        -------------                      150    .....
                                                                                         130 .... d o
                                                                                                        do--------
                                                                                                            -.......
                                                                                                                                                                    4460
                                                                                                                                                                   6, 050
Caulks Neck, Ark _____
                   ...                                                                   407       do ....                                                         4, 800
Lake Bolivar Front, Miss______                                                           415 Left -____ -                                                       6 14, 675
Cypress Bend, Ark_      -        -         -   -     -                                   427 Right _____                                                           7, 740
Arkansas City and Yellow Bend, Ark .____________                                         438 _.._ do . ----                                                       14, 930
Ashbrook Neck, Miss_______                                                               445 Left _________                                                         19, 140
Panther Forest, Ark______________________________                                        450 Right ....... -                                                           7, 500
Millers Bend, Miss____________                ______________                             460 Left__________                                                            8, 245
Tarpley Neck, Miss     ....-----------------------                                       462       ... do -                                                            1, 760
Leland Neck, Ark. ..      _._..............__                                          11470     Right                                                        6 12 15, 538
      D o   ..     .............
                               ....................                                    11470    -. . do ...               __                                 4 1213 2, 960
Leland Neck Cut-off, Ark_____                                                            471 Left _________-                                                           1, 000
                         .___.___.___
Greenville, Miss___________________.                                                     480    ... do- -----                                                       29, 430
LaGrange Towhead, Miss _..._______________                                               484 ..... do...                                                              3, 600
Warfield, Miss_        _            ..            . .                                    485 ..... do_ _       _                                                      2, 600
Vaucluse, Ark_- ..... _..........................                                        489 Right__ ____                                                           6 1, 400
Sunnyside, Ark        _             .. __            .                                   491 .      .do ...  .                                                      10, 570
Lower American Cut-off, Miss____________                                                 497 Left_____         -__                                                    2, 950
Longwood, Miss_ __                                                                       501         do- ----
                                                                                                    ....-                                                        (0)
Grand Lake, Ark ..      _._.........................._                                   508 Right ...                                                              19, 880
    Footnotes at end of table.
              1536--ENG 1934--94
1488          REPORT         OF     CHIEF             OF    ENGINEERS,                    U.         S.    ARMY,                  1934


Effective length of bank protection, June 30, 1934, and length built during
              12 months, July 1, 1933, to June 30, 1934-Continued


                                                                          Below           Bank of river                Built dur-         Effective
                           Locality                                       Cairo           Bank of river                 ing year         revetment
                                                                                                                                          in place


      VICKSBURG ENGINEER DISTRICT-continued
                                                                           Miles                                       Linearfeet        Linearfeet
Princeton, Miss_--------     -----------------------                          515        Left ...............------                           6, 550
Lake Providence Reach:
    Louisiana Bend, La -------- ------------------                                522 Right --------------------
                                                                                                      ..                                       (6)
    Lake Providence, La..........--------------------------                       540 --- do---------------------                              (6)
Valewood, Miss--------------__
                _-----                           -----                        - 528      Left                      ___13,                              820
.Hagaman, La -----------------------------------                                  544 Right---------------------                                 14, 320
Fitler Bend, Miss ...-------------------------------                              551 Left__----------- ___       ___                         6  10, 300
Cottonwood, Miss ...------------------......------------..                        557       do10,                                                    000
Goodrich, La----------------------------------------                              561 Right ---------------------                                 4, 870
Albemarle Bend, Miss____-______________.                      ...
                                                           ________               570 Left----____-______-___                                  (6)
Milliken Bend, La-------------------------------                                  584 Right ---------------------                                 6, 440
Duckport, La-----------------------------------                                   594 ---.. do--------------------                                7, 490
False Point, La ...---           -.   -.------                                    597   .. do-.... -         ----                             - 1, 965
Delta Point, La__--------------------------------                                 600 -     do---------------------                               3, 650
Opposite Delta Point-----.----------------------                                  600    Left-...........--                                    (6)
Vicksburg Harbor, Miss_____________-----____                                      601 --- do                                2 1, 505               7, 245
Barge Line Terminal, Miss_______________    ______                                601 -__.do-             --           _    ..-------------        2, 250
Reid-Bedford Bend, La.._________________---
                                 ----         ____                                608   Right_                 _    ------------
                                                                                                                       ____ _                     12, 550
            SECOND DISTRICT, NEW :ORLEANS

Yucatan Bend, Miss _____________       ______..___------- -               639-640        Left ---------------------                           ()
Hard Times Bend, La-----------------....-----------                           645        Right-                   .---------------             (6)
Hard Scrabble Bend, La__ --    ____.____. -__            _                655-656       ..--- do.......                    2855                   8, 299
Bondurant Chute, La        --
                        _____    __.__.___.-________                          657        --... do       -------------_                            5, 780
Cottage Bend, La- ......
                     -- ---           __----                  -__-           - 664       -     doo                           ..                    5, 028
Kempe Bend, La       ----------------------------- 671-675                                 ---- do --------------------.                         29,   815
Giles Bend, Miss .______________        _____--_____    11 688-692                        Left.-------------------                             (6)
Marengo Bend, La       ----------------------------        697-700                        Right_ ------------------
                                                                                                              _                                ()
Natchez Front, Miss_.....    ________  __.....____...      704-706                        Left-----------               2 2, 088                  6,   045
Deer Park, La     -------------------------------          728-729                        Right --------------------                           ()
Grand Bay, La ---------------------------------                816                        -     do --------------------                           7,   840
Plaquemine, La--_______
                 .....          ___-   -___           .___     863                      --      do--------------------                            6,   635
Avondale, La___---------------                   -------__                   - 962 ...         do ,                _                .              5, 804
New Orleans Harbor_ ..           .     ..
                                __________      ..-        ...______      965-979        Right and left...                        2328            68, 768
      Total revetments __
                       --- ..-------
                                ------                                     __
                                                                     ----------                  -.                    18617
                                                                                                                          28, 496        1 19860, 495

    1 Miles above mouth.
    2 Concrete mats.
    3 Linear feet of bank protected by rock groins.
    4 Linear feet of bank protected by permeable pile dikes.
    FLinear feet of bank protected by permeable crib- dikes.
  6   Inactive due to channel change, 5,400 linear feet, Daniels Point; 14,140 linear feet, Ashport; 16,290
linear feet, Fletchers Bend; 5,040 linear feet, Elmot Bar; 4,735 linear feet, Golden Lake; 4,987 linear feet,
bend of island no. 35; 14,024 linear feet, Hopefield Bend; 9,317 linear feet, Memphis; 3,400 linear feet,
Riverton; 3,350 linear feet, Lake Bolivar Front; 2,600 linear feet, Vaucluse; 4,200 linear feet, Longwood;
11,300 linear feet, Louisiana Bend; 12,600 linear feet, Lake Providence; 2,900 linear feet, Fitler Bend; 13,700
linear feet, Albemarle Bend; 1,950 linear feet, opposite Delta Point; 8,547 linear feet, Yucatan Bend;
11,675 linear feet, Hard Times Bend; 15,190 linear feet, Giles Bend; 19,394 linear feet, Marengo Bend;
12,757 linear feet, Deer Park.
    7 3,040 linear feet dropped in Annual Report for 1932 has subsequently been replaced.
    R Includes 5,000 linear feet of concrete mattress, 680 linear feet of lumber mattress, and 215 linear feet of
tetrahedral blocks.
    9 Lost by flanking, 1,200 linear feet, chute of island no. 35; 2,400 linear feet, Happy Valley; 1,669 linear
feet, Bauxippi-Wyanoke.
   to Built and paid for by Union Sand & Gravel Co.
   11Mileage corrected.
   12Length corrected.
   13Bank protection destroyed due to development of cut-off; 2,000 linear feet of mattress; 1,565 linear
feet of dike.
   14200 linear feet of tetrahedral blocks included.
   15 Linear feet tetrahedral blocks.
   165.4 miles.
   17 Includes 21,001 linear feet concrete mats, 3,215 linear feet tetrahedral blocks, and 680 linear feet board
mattress; does not include 1,700 linear feet permeable pile dikes.
   13 Does not include 1,500 linear feet of pile and rock groins, 20,820 linear feet of permeable crib dikes, nor
5,120 linear feet of permeable pile dikes.
   19 163 miles.
                                          MISSISSIPPI RIVER COMMISSION                                                                           1489
  The following table shows the total length of effective contraction
works in place and the amount built during the 12 months ending
June 30, 1934:
Effective length of contraction works, June 30, 1934, and length built during
                   12 months, July 1, 1933, to June 30, 1934

                                                                                                                                               Effective
                                                                                        Below              Bank of           Built dur-       permeable
                                    Locality                                            Cairo               river             ing year         dikes in
                                                                                                                                                 place


                     MEMPHIS ENGINEER DISTRICT
                                                                                               Miles                         Linearfeet Linear feet
Dorena Landing, Mo---          ........ _.......................
                                                  ___                                            37-40 Right _.............                        15,000
Island 8, Ky...------------...........----------                      .......                   42-48 Left __-----------------                  1 12, 804
Chute of Island 8, Ky              ------------------------------                               43-45 -_do------- ------------                    1 5, 054
Kentucky Point, Ky-------------------------------70-71                                                 ___do------- -----------                  1 8, 216
"Toney    Towhead, Tenn----....---------------------------                                       76-78     do-------               --------       1 6, 000
Point Pleasant, Tennmu...------------------------------                                         79-81 -do-------------------                     1 8, 445
Ruddles Point, Mo----.---------------------------------
                                    3    - -- - - - - - - - - - - - - - -- - -- - - - - -        85-87 Right-----------------                      1 4, 229
Head of Island 13, Tenn.3 - - - - - - -- - - -                - - - - - - - -- - - - - - -      91-92  -__do-------            ----------         1 4, 412
Island 15, Gayoso, Tenn....                                 .                                 105-107 -_do --     ---                 1 428       14, 428
  Caruthersville, Tenn._.                 ..-----------------------------                      110-113 Left------------                    -----   1 8, 686
  Below Caruthersville, Mo....................-----------                             ...      113-114 Right      ---.--------                     1 2, 374
Bells Point, Mo..---------------------------------115-117
  Booths Point, Tenn___---                . __-- __-... __.-                         -__
                                                                                                        ___do--...-----
                                                                                               119-121 Left ...--
                                                                                                                                     -------
                                                                                                                                        1 184
                                                                                                                                                   1 3, 580
                                                                                                                                                   1 1, 684
,Cottonwood Point, Mo_-                       ----       ------------------                    124-125   Right__...                  1 1, 407      11, 407
.Head Island 21, Tenn_----------------------------127-130                                                Left ____---_.----------                  1 8, 657
  Ashport-Golddust, Ark______-
Ashport-Golddust, Tenn------
                                                        __________---__---                     154-158   Right_...____
                                                           -------------------- 158-160 Left-------------------
                                                                                                                             -----
                                                                                                                               ---               1 10, 436
                                                                                                                                                     1, 600
  Keyes Point, Tenn---..-----..               -----------------------                          162-164 ___do....-------------------                  6, 847
  Below Luxora, Ark--.-___           -         --         ________---          ___        _    163-164 Right ...   ------.----                     15, 600
:Island 34, Ark_____            __ .__------- .....    ___ --       --          ___            179-182 __do_....--                   I 2, 859      1 9, 020
  Morgan Point, Ark............................------------------------------                  185-187 __do......-------_------                    16, 025
 ,Chute of Island 35, Tenn.....--------....................-----------------.                  194-197 Left__----__------------                  1 47, 075
  Below Island 35, Ark-_.-----------------------------                                         196-198 Right__--- ------------ 5 3, 950
       Do----------------------------------------                                              196-199 - do-------.......-----------.              1 6, 594
  Redman Point, Ark_-_______-                   _-_--       __-....             __        _    218-220 ___do-..               ...------
                                                                                                                                 ------------...     4, 018
  Redman Point, Tenn                 -----------------------------                             219-221   Left..----_--------------                   3, 484
 -Vice Presidents Island, Tenn__.....------------- -----                                  _    229-230 __do .......-----------                     1 3, 685
  Cat Island, Ark.................................---------------------------------250-253               Right..---...------------                   7, 749
  Prairie Point, Ark-.                               .                                         301-303
                                                                                        .-------------------------------
                                                                                                        -__do-------------------                   1 7, 341
  Island 63, Miss..__-- ____--__                                  _______--------------------- 328-331   Left.------.-----------                   14, 999
                    VICKSBURG ENGINEER DISTRICT
 'Walker Bend, Ark____-.......__-__-__-      ________.__._                                     489 Right .----                     7 2, 000        7 2, 000
  False Point, La..---------------      ----------------------                               - 597 __do-       ---
                                                                                                               l-                                  18 450
Youngs Point, La__-..............___-_____-...           __......                             598 _- do--_--                      ?4, 500         7 4, 500
          Total contraction works--                 ----              -.._ _             -   ----...-                  --.    -    11, 378      10 180, 349


    1 Permeable pile dikes.
    2 Revised.
    3 Incorrectly shown as Missouri in 1933 Annual Report.
     44,055 linear feet have been removed since 1933 Annual Report.
    s Permeable crib dikes.
     6 300 linear feet have been removed since 1933 Annual Report.

     ? Sand dikes.
     8 Dike was not completed due to high water and change in plans.
     62.2 miles.
    io 34.2 miles.


    Effect of dikes in channel adjustment.-The effectiveness of the
dikes is, for the most part, dependent upon their ability to induce
deposits where flow is not wanted, and upon their ability to give a
fixed direction of departure to the low-water flow in crossings.
A study of their effectiveness indicates that the dikes that have been
constructed to date have been successful in creating a fill (averaging
approximately 4.5 feet per year), thereby deepening the main
channel, and in giving a fixed direction to the low-water flow.
1490           REPORT             OF      CHIEF OF ENGINEERS,                     U.     S.    ARMY,     1934

   The permeable pile dikes in the vicinity of Island 21 have been
quite successful in the purpose for which they were intended; i. e.,,
directing the flow into the right channel and down the right of Island
21. Since the completion of this series of dikes, a fill of from 9 to 15.
feet has been deposited, extending from the left bank to the middle
bar, closing off the 9-foot channel through the dikes, the Island 20,
crossing opposite the dikes has opened up with a deeper and wider
channel, eliminating all dredging at this crossing and navigation is
now using the right channel of Island 21.
   The purpose of the series of dikes constructed opposite Caruthers-
ville, Mo., was primarily to close the Tennessee Channel, eliminating
a very difficult crossing at Pflaglers Towhead and deepening the
secondary channel along the Caruthersville front. In 2 years the
results have been a fill of 5 to 20 feet between the dikes, a successful
closing off of the Pflaglers Crossing with a wider and deeper channel
extending down the entire Caruthersville front.
   Construction on permeable dikes at False Point, La. (597)' was
suspended January 1933, due to change in plans and the effect on
channel adjustment cannot be determined. The sand dikes built at
Youngs Point (598)1 have been successful in the purpose for which
they were designed, i. e., partially closing the right channel and
diverting a major portion of river flow to the left of the middle bar-
and increasing capacity of left channel. The sand dikes at Walker
Bend (489)1 have not been completed and the effects on channel
adjustment cannot as yet be determined.
                                                                 LEVEES

  During the fiscal year ending June 30, 1934, 126,368,330 cubic yards
of earthwork were placed in levees as follows:

                                                                                         Cubic yards placed

                                  District District                       Below Cape
                                                                          Below Cape          Girardeauand
                                                                                               Above Cape
                                                                           Girardeau          Girardeau and Repairs (ses.
                                                                            (sc.r au           tributaries    6 and 7) a
                                                                            (see. 1) a           (sec. 6) a

Rock Island-----------------------------------------------------------------                                        27, 140
St. Louis-------.......-------------------------------..               ....--------------..  2, 691, 597              4, 139
Memphis---- ----------------.................                                 48, 425, 409       28, 884         1, 120, 125,
Vicksburg -     -             ....----------------------------
                                                      __.            -        26, 399, 839 .- ._- _ __              412, 574-
Second New Orleans -------------------------------                           47, 258, 623 ..

  aSections refer to sections of May 15, 1928, Flood Control Act.
    1 Figures in parentheses denote distance in miles below Cairo.
                                  MISSISSIPPI RIVER                     COMMISSION                                                 1491
  The costs and net expenditures for levees during the 12-month
period ending June 30, 1934, were as follows:

                                                                     Regular funds                        National Recovery
                                                                                                         Administration fund
                    Description
                                                                               Net expendi-
                                                                                                                                  Net ex-
                                                                Costs
                                                                                  tures                      Costs                pendi-
                                                                                                                                   tures
                                                       _I




             UNITED STATES FUNDS

Levees under par.1 of sec. 6 of Flood Control
  Act approved May 15, 1928:
    Rock Island district-------------__                             $43. 21           $543. 21
    St. Louis district......                                   268, 455. 74       289, 134. 79         --------          ---------
                                                                                                                       5------

    Memphis district_ ..                                          -71.43           11, 964. 05               $8,669.95            $8, 669.95
    Vicksburg district........................                      378. 36            378. 36
Levees under par. 2 of sec. 6 of Flood Control
  approved May 15, 1928, maintenance and
  repair: Vicksburg district- .............                     44, 643. 26           51, 757. 36
Levees under sec. 1 of Flood Control Act
  approved May 15, 1928:
    Memphis district      ----                               4, 438, 472. 72    4, 685, 194. 91       6, 450, 163. 28 5, 333, 089. 77
    Vicksburg district.....              -                   3, 425, 119. 36    3, 293, 778. 83       1, 312, 010. 50 1, 173, 762. 16
    Second New Orleans district-............                 6, 975, 381. 21    6, 900, 531. 35       2, 993, 104. 34 2, 873, 579. 74
Levees under sec. 7 of Flood Control Act
  approved May 15, 1928:
    Rock Island district----------------------                   8, 068. 83         8, 068. 83
    St. Louis district .      ...                                4, 224. 98         6, 968.95
    Memphis district....---       --------------               326, 070. 68       318, 922. 76
    Vicksburg district __-------------------                    35, 239. 51        27, 237. 69
    Second New Orleans district --------                         1, 240. 39         1, 240. 39
       Total United States funds ----     -      .-.        15, 527, 266. 82   15, 595, 721. 48 10, 763, 948. 07 9, 389, 101. 62
                                                                                                    I-----            -I-------
                                                                                 SI                                        I

               CONTRIBUTED FUNDS

;Levees under sec. 6 of Flood Control Act
   approved May 15, 1928:
     Rock Island district_--------------------                    -43.56             -43.56
     St. Louis district ...... ..... ...... ......             144, 775. 22       144, 775. 22
     Memphis district      ..---.    ..------------..            5, 913. 75         5, 913.75                 4, 334. 97           4, 334. 97
     Vicksburg district .       __- .                               189. 18            189. 18
Levees under sec. 7 of Flood Control Act
P approved May 15, 1928: Vicksburg district-_                       620. 52                         __
                                                                                         620.52 1____--
Improvement of Mississippi River levees
   under sec. 4 of River and Harbor Act of
   Mar. 4, 1915:
     Memphis district_                                            6, 991.18            6, 991. 18
     Vicksburg district           _       _                       1, 200. 58           1, 200. 58
       Total contributed funds------                           159, 646. 87       159, 646.87                 4, 334. 97           4, 334.97
       Grand total_-- ---------.---------                   15, 686, 913. 69   15,755,368.35 10, 768, 283. 04 9, 393, 436. 59
1492    REPORT OF CHIEF OF ENGINEERS,              U.   S. ARMY,   1934

   On June 30, 1934, the estimated, content of the levee lines already
up to or in process of construction to the approved grade and section
covering the Mississippi River from Rock Island, Ill., to Cape
Girardeau, Mo., and on the outlets and tributaries of the Mississippi
River between Rock Island and Head of Passes, La., insofar as such
outlets and tributaries are affected by backwater of the Mississippi
River on which data were available as provided for in section 6
of the act of May 15, 1928, was about 74,853,732 cubic yards; about
12,074,078 cubic yards remain to be placed to complete the work.
The estimated content of the levee lines already up to or in process
of construction to the adopted project grade and section covering the
main river project levees from Cape Girardeau, Mo., to the Head
of Passes, La., as provided for in section 1 of the above act, was
about 729,196,008 cubic yards; about 209,590,374 cubic yards re-
main to be placed to complete this project. A total of 1,563,978
cubic yards were placed in levees under sections 6 and 7 of the
above act during the fiscal year ended June 30, 1.934 (maintenance
and repairs); no estimate can be made of the yardage remaining
to be placed under section 7.
   During the past 6 years more than 466,054,000 cubic yards have
been placed in levees (over 446,002,000 cubic yards under sec. 1 and
over 20,052,000 cubic yards under sec. 6 of the act dated May 15,
1928); in addition some 5,046,000 cubic yards were placed under
sections 6 and 7 of the act during the same period (maintenance and
repairs). Yardage placed increased from 23,000,000 in fiscal year
1929 to over 107,528,000 in 1933, and to over 124,804,000 in 1934 (a
record for yardage placed in 1 year); and prices gradually reduced
from about 26.7 cents per cubic yard in 1929 to about 15.5 cents per
cubic yard in 1933; prices per cubic yard advanced slightly in
1934 (in the Memphis district work let under contract averaged 21.9
cents per cubic yard and in the second New Orleans district over
47,250,000 cubic yards were placed at an average unit price of 19.4
cents per cubic yard.
   For convenience of administration, allotment of funds, and han-
dling of local contributions for levee purposes, the Mississippi River
front below Rock Island, Ill., has been divided by the Federal au-
thorities into reaches designated as levee districts. In some in-
stances these reaches or districts embrace the river fronts of several
local levee organizations, the names and locations of which, as now
established, are as follows:
  1 This estimate reduced due to closer surveys and does not include yardage to be-
abandoned; see table 2, p. 1498.
                        MISSISSIPPI RIVER COMMISSION                       1493
                                MISSISSIPPI   RIVER

    Rock Island to New Boston, Ill.; left bank (484 to 435').
    Muscatine to mouth of Iowa River, Iowa; right bank (457 to 436').
    Mouth of Iowa River to Burlington, Iowa; right bank (436 to 406').
    Oquawka to Dallas, Ill.; left bank (418 to 392 ).
    Mouth of Des Moines River to La Grange, Mo.; right bank (364 to 338').
    Warsaw to Quincy, Ill.; left bank (362 to 329').
    La Grange to mouth of Missouri River, Mo.; right bank (338 to 197 ).
    Quincy to Hamburg Bay, Ill.; left bank (329 to 267 ).
    Head Chouteau Island to Prairie du Pont, Ill.; left bank (195 to 176').
    St. Louis to Cape Girardeau, Mo.; right bank (182 to 54').
    Prairie du Pont to Grand Tower, Ill.; left bank (176 to 82').
    Grand Tower to Gale, Ill.; left bank (82 to 48 ).
   Little River drainage district; right bank (49').
    Thebes to Cairo, Ill.; left bank (46 to 0').
   Upper St. Francis levee district, vicinity of Cape Girardeau, to New Madrid,
Mo.; right bank (54' to 712).
   Reelfoot levee district, Hickman, Ky., to Slough Landing, Tenn.; left bank
 (36 to 602).
    Slough Landing Neck Dike; left bank (61 to 65').
   Lower St. Francis levee district, vicinity of New Madrid, Mo., to mouth of
St. Francis River; right bank (71 to 298 2).
   Upper Yazoo levee district, from just below Memphis, Tenn., to the Bolivar-
Coahoma County line; left bank (227 to 365 2).
   Lower Yazoo levee district, Bolivar-Coahoma County line to mouth of Yazoo
River; left bank (365 to 602 2) .
   White River levee district, Helena, Ark., to White River; right bank (307
to 3912).
   Homochitto levee district, mouth of Yazoo River to Baton Rouge; left bank
 (602 to 8342).
   Upper Tensas levee district, one-half mile downstream from city limits of
Pine Bluff, Ark.; on the Arkansas River, 116 miles above its mouth, to opposite
Warrenton, Miss. ; right bank (6092).
   Lower Tensas levee district, opposite Warrenton, Miss., to mouth of Red
River, including Palmyra Island; right bank (609 to 772 2).
   Atchafalaya levee district, Red River to Bayou Lafourche; right bank (772
to 9852).
   Lafourche levee district, Bayou Lafourche to Orleans levee district; right
bank (895 to 9752).
   Barataria levee district, Orleans levee district to Head of Passes; right bank
 (989 to 1,070 2).
   Pontchartrain levee district, Baton Rouge to Orleans levee district; left bank
(842 to 966 2).
   Lake Borgne levee district, Orleans levee district to Head of Passes; left
bank (979 to 1,0702).
   Orleans levee district, composed of the parish of New Orleans. It extends
from the Lafourche levee district to the Barataria levee district, right bank
(975 to 9892) and from the Pontchartrain levee district to the Lake Borgne
levee district, left bank (966 to 9,79 2).
  Local levee districts on tributaries of the Mississippi River up to
the limit of flood-control work as provided for under the approved
project are as follows:
Illinois River from mouth to mile 120, near Havana, Ill. (backwater limit) :
Left bank.-Nutwood, Eldred, Fairbanks (Keach), Hartwell, Hillview, Big
Swan, Scott County, Mauvais Terre, Naple City, Coon River, Willow Creek,
 'Miles above Cairo.
2 Miles below Cairo.
1494    REPORT OF CHIEF OF ENGINEERS,             U. S. ARMY,    1934

Meredosia Lake, Indian Creek, city of Beardstown, South Beardstown, Lost
Creek, and slough special drainage and levee districts.
   Right bank.-Valley City, McGee Creek, Little Creek, Big Prairie, Crane
Creek, Coal Creek, Kelly Lake, Big Lake, West Mantanzas, Seahorn, Kerton
Valley, Langellier, and Lacey drainage and levee districts.
   Wood River.-Wood River drainage and levee district.
   Missouri River, from mouth to St. Charles, Mo. (backwater limit) :
   Right bank.-St. Louis County levee district no. 1.
   Ohio River from mouth to mouth of Cache River (act July 27, 1916) (back-
water limit is above Shawneetown, Ill.) :
   Left bank.-None.
   Right bank.-Cairo, Mounds, and Shawneetown drainage districts.
   White River from mouth to Peach Orchard Bluff, Ark. (backwater limit)
   Left bank.-Clarendon and White River levee districts.
   Right bank.-Little Red River levee district no. 1.
   St. Francis River from mouth to mouth of Tyronza River, just above Parkin,
Ark. (backwater limit) : No local districts.
   Arkansas River from mouth to the line between sections 10 and 11, T. 7 S.,
R. 5 W., fifth principal meridian, near Lake Point, Ark. (backwater limit) ;
division line between Lincoln-Jefferson Counties, Ark. (act July 27, 1916) ; the
adopted project limit on south bank (act May 15, 1928) is one-half mile
downstream from Pine Bluff city limits, Arkansas) :
   Left bank.-Farelly Lake, Jefferson County, and New Gascony levee districts.
   Right bank.-Southeast Arkansas, Linwood-Auburn, and Frenchtown levee
districts.
    Ouachita River from mouth to vicinity of Lock and Dam No. 8, 330 miles
:above mouth of Red River (backwater limit) :
   Left bank.-Tensas Basin levee district.
    Yazoo River from mouth to mouth of Wolf Lake above Yazoo City, Miss.
 (backwater limit) :
   Left bank.-Rocky Bayou, Eden Bayou, and Willis Creek levee and drainage
districts.
   Right bank.-Warren County and Atchafalaya levee and drainage districts.
    Red River, from mouth to Alexandria, La. (backwater limit) ; the adopted
project limit on south bank (act, May 15, 1928) is Boyce, La., thence along
Bayou Jean de Jean to Hotwells, La.:
   Left bank.-Saline levee and drainage district.
    Right bank.-Red River, Atchafalaya, and Bayou Boeuf levee district from
Boyce to Moncla; Red River and Bayou des Glaises levee and drainage district
from Moncla to mouth of river.
   Atchafalaya River, from mouth to Morgan City, La.:
    West bank.-Red River, Atchafalaya, and Bayou Boeuf levee district from
junction of the Atchafalaya and Bayou des Glaises at Simmesport, La., to
Butte La Rose on the Atchafalaya River.
   East bank.-Atchafalaya levee district.
    (NoTE.-The Atchafalaya levee district includes entire basin down to Morgan
City, with the exception of the right-bank levee from Simmesport to Bayou
Courtableau.)
   The following tabulations covering levee work under sections 1,
6, and 7 of the act approved May 15, 1928, are similar to the tabula-
tions given in previous reports. The tabulations have been brought
up to date and show the present conditions of levees below Rock
Island, Ill., and levee operations during the 12 months ending June
30, 1934, as compiled from data submitted by the district engineers.
   The column " Estimated final contents " of the levees given in
table 1 is based on grades, sections, and quantities fixed pursuant to
section 6 of the project adopted by Congress May 15, 1928. The
same column of table 2 is based on grades, sections, and quantities,
as provided for in section 1 of the above act. Table 3 covers work
                  MISSISSIPPI RIVER COMMISSION                  1495
accomplished under sections 6 and 7 of the May 15, 1928, act, for
repairs of flood damage; the levees are reconstructed to their origi-
nal grade and section. Levees in the several districts that have
been completed to the approved grade and section are as follows:
Rock Island engineer district, 249.1 miles; St. Louis engineer dis-
trict, 194 miles; Memphis engineer district, 446.2 miles; Vicksburg
engineer district, 351.8 miles; and second district, New Orleans,
566.1 miles; total, 1,807.2 miles.
TABLE 1.-Present condition of MississippiRiver levees from Rock Island, Ill., to Cape Girardeau, Mo., and on the tributariesand outlets of
    the Mississippi River between Rock Island and Head of Passes, insofar as such tributariesand outlets are affected by the backwater of the
    Mississippi River; and levee operationsfor the 12 months, from July 1, 1933, to June 30, 1934, as provided for in sec. 6 of the act of May
    15, 1928

                                                                                                                                                                                                                                                                                        Approx-
                                                                                                                                                                                                                                                                         Percent         imate
                                                                In
                                                                                       Built                                                          Built                              Lost or              Contents                         now     area
                                                              system
                                                                      Built    to ap-                  Contents Built since since Total built aban-                                                           June 30, Required to Estimated   built
Name of engineer district, and reach or levee                        exist- proved                    June 30,               by      since   doned                                                                                   final   to       pro-
                                                                                                                                                                                                                                                 ap- tected
                   district                                    when            grade                                  United local
                                                                                                      1933, exist- byStates         June 30,  since                                                             1934,
                                                               com-    ing                                                                                                                                    existing  complete    contents proved   with                                              O



                                                              pleted levees i section
                                                                                and                   ing levees            author-   1933 June 30,                                                            levees                         grade   exist-
                                                                                                                                                          ities                           1933                                                  and
                                                                                                                                                                                                                                                                                              ing       0
                                                                                                                                                                                                                                                                             section        levees
                                                          I            I                 -        I                                               I                   I                                  I                       I                    I-                 1              1     -
                                                                                                                                                                                                                                                                                            Square
Rock Island engineer district:                                  Miles Miles            Miles            Cu. yd.              Cu. yd.                  COu.yd.              Cu. yd.       Cu. yd.               Cu. yd.                  Cu. yd.             Cu. yd.                          miles      0
     Rock Island to New Boston, Ill ....------                    31.4    31.4          31.4           4, 319, 840     ..    . .   . .   .   ..       .    . .    .                         ... ..   .        4, 319, 840                                  4, 319, 840        100. 0             44
                                                                                                                                                                                                                                                                                                        H
     Muscatine to mouth of Iowa River,
       Iowa 2_-__-_-__------                -         ------      22. 0   22. 0         22. 0          2, 514, 220                                                                                            2, 514, 220 ------------                     2, 514, 220        100. 0              34
     Mouth -of Iowa                       - - - Burlington,
                               - - - - - to
                  - - - - - River               -- -- -- -- --
       Iowa 3                                                     34. 7   34. 7         34. 7         43, 405, 832                                                                                           4 3, 405, 832                                 3, 405, 832        100. 0              70
     Oquawka to Dallas, Ill11------------                         20. 3   20. 3         15. 3          2, 496, 369                                                                                             2, 496, 369                  33, 959        2, 530, 328         98. 7              29
     Mouth of Des          Moines            River    to
                       6- - - - - - - - - - - - - - - - -    La
       Grange, Mo.                                                21.4    21. 4         21.4           1, 640,   943                                                                                           1, 640, 943                                 1, 640, 943        100. 0               30
     Warsaw to Quincy, Ill ....                       -           40. 8   40. 8         40. 8         73, 018,   574                                                                                         7 3, 018, 574                                 3, 018, 574        100. 0               74
                                                                                                                                                                 500                 -
     La Grange to mouth of Missouri River 8 -
     Quincy to Hamburg Bay, Ill ________
                                                                  33. O0 33. 0
                                                                  53. 0   53. 0
                                                                                        33.0
                                                                                        50. 5
                                                                                                       2, 339,
                                                                                                      97, 583,
                                                                                                                 206
                                                                                                                 855
                                                                                                                                           --.------ -------------
                                                                                                                                         -------        .--                                                    2, 339, 206
                                                                                                                                                                                                             9 7, 583, 855                271, 647
                                                                                                                                                                                                                                                           2, 339, 206
                                                                                                                                                                                                                                                           7, 855, 502
                                                                                                                                                                                                                                                                              100. 0
                                                                                                                                                                                                                                                                               96. 5
                                                                                                                                                                                                                                                                                                   62
                                                                                                                                                                                                                                                                                                  172
St. Louis engineer district:
     Head of Chouteau Island to Prairie du
       Pont, Ill      __ -                -             -         21. 0   21. 0         21.0           2, 632, 235                                           500                 500                          2, 632, 735            ... _._._._._ 102, 632, 735              100. 0              96
     Prairie du Pont to Grand Tower, Ill__ __                     16. 0   16. 0         16. 0             485,946                                         6, 700              6, 700                             492, 646                            10492, 646               100. 0              46
     St. Louis to Cape Girardeau, Mo .......                      17. 6   17. 6         17. 6          1, 443, 816                                                                                            1, 443, 816                            1, 443, 816              100. 0              32
     Grand Tower to Gale, Ill._                   _____ ____    1045. 0 1045. 0         42. 4          2, 915, 783              62, 959                                      62, 959                          2, 978, 742              to 567, 041 103, 545, 783             10 84. 0             75
     Havana to Beardstown, Ill. (Illinois
       River)       ------------------------                      32. 2   32. 2              .6        4, 583, 435                                                                                            4, 583, 435              4, 016, 565         8, 600, 000         53. 3              30
     Beardstown, Ill., to mouth of Illinois
       River (Illinois River)_____ _________                     172. 1  172. 1         96. 4         31, 223, 562       2, 620, 738                        700           2, 621, 438 12178, 609             33, 666, 391              6, 621, 152    1340,287, 543            83. 6              194
Memphis engineer district: Shawneetown,
  Ill. (Ohio River)__________________________                      3.9     3.9           3.9              937, 178              28, 884                                      28, 884                            966, 062                                   10966, 062         100. 0              102
Vicksburg engineer district: 14 Atchafalaya
  drainage and levee district (right bank,
  Yazoo River, Miss.)                                             13. 3   13.3           4.0              371, 286                                                                                               371,286                  563, 714           935, 000          39. 7              156
Second district, New Orleans: Saline (Beaver
  levee, left or north bank Red River) 15           ---          162.9
                                                                 SI
                                                                         16 2.9
                                                                                   I
                                                                                       16 2.9
                                                                                                  I
                                                                                                          399, 780                                                                                               399,780                                     399, 780         100. 0         (17)


       Total-__--      - --- ---      ---          __          580.6       580.6       453.9          72,311,860            2, 712, 581                   7, 900          2, 720, 481    178, 609            74, 853, 732             12, 074, 078     86, 927, 810            86. 1          1, 146
                                                                                                  I                                            I                                                                             I
      1iRegardless of grade and sectioni.
      2Includes 1.8 miles of levee along Iowa River, left bank, from mouth to biuffs, in Louisa County levee district no. 15.
      3 Includes 6.8 miles of levee along Iowa River, right bank, from mouth to bluffs, in Iowa River-Flint Creek levee district no. 16.
      4 Does not include 5,474 cubic yards placed in filling crevasses in Keithsburg drainage district, Illinois, in 1929.
      5Includes 3.3 miles of levee along Henderson River, right bank, from mouth to high ground in Henderson County drainage district no. 3 and 2.5 miles along Henderson River,
left bank, from mouth to high ground in Henderson County drainage district no. 1.
      6Includes 8.3 miles of levee along Des Moines River, right bank, and 6.3 miles of levee along Fox River, left bank, in Des Moines-Mississippi levee district no. 1, Missouri.
      ?Does not include 118,810 cubic yards placed in filling crevasses in Indian Grave district in 1929.
      8La Grange to opposite mouth of Illinois River.
      9 Does not include 5,100 cubic yards placed in filling crevasses in South Quincy drainage and levee district in 1929 and 1930.
     10Revised.
     11Includes 5.7 miles of levee along Big Muddy River, left bank, from mouth to bluffs in Preston levee and drainage district.
     12Abandoned due to construction of new levee, Valley City district.
     13Reduced by 178,609 cubic yards abandoned due to construction of new levee, Valley City district.
     14See also table 3, p. 1501, for Farelly Lake levee work.
     1sThis work is now under the jurisdiction of the Vicksburg engineer district.
     16This mileage applies to Beaver levee only.
     17Included in area protected levee system in Saline levee district.

                                                                                                                                                                                      i-4




                                                                                                                                                                                      o


                                                                                                                                                                                      r2
                                                                                                                                                                                      0
TABLE 2.-Present condition of main r'ver levees, from Cape Girardeau, Mo., to Head of Passes, La., and levee operationsfor the 12 months
                      from July 1, 1933, to June 30, 1934, as provided for in sec. 1 of the act of May 15, 1928
                                --I                                                                                                                                                                                                                               (
                                                                                                                                                                                                                                           Per-     Approx-
                                                                                                                                                                                                                                           cent      imate
                                              In sys-                                                          Built
                                                       Built, Built to          Contents,        Built
                                                                                                               since    Total                Lost or                 Contents,                                                             now        area
Name of engineer district and reach
                                                 tem
                                               when    exist- adopted           June 30,         since
                                                                                                                 by      built
                                                                                                                         since             abandoned                 June 30,                 Required             Estimated
                                                                                                                                                                                                                      final
                                                                                                                                                                                                                                          built      pro-         a
                                                                grade              1933,          by                                                                    1934,                 to com-                                       to      tected
         or levee district
                                                com-
                                                        ing
                                                                 and             existing       United          local  June 30,
                                                                                                                                           since June                existing                   plete               contents             adopted     with         H
                                               pleted levees                                                   author-                       30, 1933
                                                               section            levees        States                    1933                                        levees                                                              grade      exist-
                                                                                                                 ities

                                                                                                                                                                                                                                     1
                                                                                                                                                                                                                                           and
                                                                                                                                                                                                                                         section
                                                                                                                                                                                                                                           -
                                                                                                                                                                                                                                                      ing
                                                                                                                                                                                                                                                    levees        t
                                                                                                                                                                                                                                                                  O

                                                                                                                                      I                         I                       I                      1
                                                                                                                                                                                                                                                                  Q
                                                                                  Cubic         Cubic          Cubic     Cubic                    Cubic                 Cubic                    Cubic                 Cubic                        Square        0
Memphis engineer district:                    Miles Miles            Miles        yards         yards          yards     yards                    yards                 yards                    yards                 yards                         miles
   Little River drainage district ----          2 19.6    2 19.6       3 18. 1    4, 574, 882                                                                         4 4, 574, 882               5300, 00(        5 6 4, 729, 881    7    793.          400
   Thebes to Cairo, Ill___________                89. 7     8 9. 7      8 9.      3, 417, 091                                                                           3, 417, 093                                              100. 0
                                                                                                                                                                                                                       3, 417, 091                        11
   Ohio River_______                            911.3     911.3          10.1   102, 921, 101     523, 464                 523, 464                                  11 3, 444, 565                5 44, 021        123, 488, 591
                                                                                                                                                                                                                                798. 7                    12      O
   Upper St. Francis_           -       __    13 132. 2 14 132. 2    15100. 1 1830, 964, 046 1, 922, 159                1,922, 155              17330, 600 41632, 555, 605                       2, 893, 451 5 61634,744,365 716 91. 7                   700      P
   Lower St. Francis___                       18213. 4 19213. 4      20 170.   2175,161, 114 19, 461, 920              19, 461, 920          17 1, 591, 486 42193,031, 548                    2 13, 201, 277 56 2196,969,323 7 2186.4                 3, 500
   White River.. .---------------- 22 73. 5 2273. 5                   2330. 6    30, 994, 038 10, 161, 532             10,161, 532                17116, 537         4 41, 039, 033           3 21, 556, 525 56 53, 251, 934    7 59. 5                  910      M
   Reelfoot...-------------------------        2423. 0    523.0          11.9     6, 654, 944     938, 649                 938, 649       .............               47, 593, 593             5 2, 633, 525 5 6 8, 394, 247 7 68. 6                     310
   Slough Landing Neck Dike __.       ...       259. 1      3 7. 8     253.1         850, 000                                                                           4 850, 000                5 300, 000    6 1, 063, 665   771.8                    26 5
   Upper Yazoo_--------------------            2793. 6 2793. 6          87. 7    67, 325, 545 15, 417. 685             15, 417, 685          174, 986, 709           4 77, 756, 525            53, 714, 470 5 78. 721. 580 7 95. 3                    3, 281           -
Vicksburg engineer district:
   Lower Yazoo, east bank Missis-
     sippi River, Miss______.             __    200. 0     187. 7      149. 2   123, 080, 785 13, 241, 131 ..     ..   13, 241,131           179, 408,111           4126, 913, 805            6 6, 544, 510156131, 829, 545 7 28 95. 0                2,140       J
   Upper Tensas:                                                                                                                                                                                                                                                  U2
       South bank, Arkansas River,
          Ark_ _-------------------          5 2990. 4 5 2989. 4        68.      24, 883, 064     637, 894                637, 894                17202, 812         425, 318, 146               5 134, 000 5 6 25, 442, 104              7 99. 5
       West bank, Mississippi River,
          Ark_ __
       West bank, Mississippi River,
          La .------------
                                               29 75. 2

                                                  90. 0
                                                         2975.2

                                                            90. 0
                                                                        33.

                                                                        70. 7
                                                                                 45, 655, 053

                                                                                 57, 612, 981
                                                                                                  266, 428

                                                                                                9, 469, 514
                                                                                                                          266, 428
                                                                                                                       9, 469, 514
                                                                                                                                          -..........

                                                                                                                                             175, 829, 600
                                                                                                                                                                      45, 921, 481
                                                                                                                                                                     4 61, 252, 895
                                                                                                                                                                                                   999, 088

                                                                                                                                                                                              51, 711,898
                                                                                                                                                                                                                     46, 920, 569
                                                                                                                                                                                                                3 6 57, 010, 943 7 28 97.
                                                                                                                                                                                                                                            97.9
                                                                                                                                                                                                                                                      2, 000      5
   Boeuf floodway:
         Arkansas --- --         -               (30)                                                                  ----------                                                              14, 007, 155          14, 007, 155            0.0
         Louisiana____                           (30)        25. 8      25.          574, 801   2, 784,872              2, 784,872                                      3, 359, 673            30, 323, 693          33, 683, 366           10.               5

Second district, New Orleans:
    Lower Tensas _____                           156. 8    156. 8       86.5     67, 218, 074  9, 678,   765            9, 678, 765   174, 929,000                   471, 967, 839              18, 574, 017       6 78, 021, 726         776.2     2, 242        H
    Atchafalaya (front)                          127. 3    127. 3       88.      48, 441, 351 10, 687,   674           10, 687, 674   173, 631, 000                  4 55, 498,   027          55, 000, 000        6 53, 000, 000         790.6 5,418
                                                            81. 8       62. 4                     255,   374
                                                                                                                                    S17173132 66,500
                                                                                                                                              20, 000                  10, 051,   400            8, 898, 060       6 11, 456, 038         7 22.3
    Lafourche_                                    81.8                           17, 350, 003                              255, 374                                     7, 467,   477         33 34 332, 523           7, 800, 000         95. 7 S2, 248          C0
    Barataria_                      _             71.9       71.9       30.       6, 707, 805      42,   723                42, 723       1712, 500                   a6, 738,    032            1, 381,869          66, 410, 480         7 78. 4   (35)

    Pontchartrain       __________               126. 0    126. 0       99.
                                                                        11.
                                                                                 38, 380, 164 2, 585,    482            2, 585, 482          {7
                                                                                                                                    r 1731 743, 000
                                                                                                                                        32 213, 000
                                                                                                                                                                     4 34, 183,
                                                                                                                                                                        5, 826,
                                                                                                                                                                                  442
                                                                                                                                                                                  204
                                                                                                                                                                                                 1, 512,113
                                                                                                                                                                                            33 341, 170, 957
                                                                                                                                                                                                                   6 34, 954, 013
                                                                                                                                                                                                                       6,997, 161
                                                                                                                                                                                                                                          7 95. 7
                                                                                                                                                                                                                                            83.3
                                                                                                                                                                                                                                                  } 1,021
    Bonnet Carre spillway, side levees            11.8      11.8                 10, 959, 698                                                                          10, 959,   698                25, 302         10, 985, 000           99. 8
    Lake Borgne_                                  47. 9     47. 9       23.7      6, 245, 604     342,   618              342, 618                17149, 000          46, 439,    222               526, 278         6 6, 123, 232        791.4        731
    Red River, Atchafalaya, and
      Bayou Boeuf--------- -_--                  123, 5    123. 5       94. 7    16, 977, 582   2, 738,463              2, 738, 463               17 846, 500        4 18, 869, 545              1, 261, 537       6 16, 714, 592         7 92. 5     1, 326
                                                                                                                                                              3 3
    Atchafalaya (back).--------------    53. 1       53. 1       45. 2    12, 747, 901     240, 164-    ..... 240, 164        i1 202, 000      12, 786,   065 4 1,187, 282        13,973, 347      91. 5     (3e)
    Bordelonville, west------            11. 8
                                         11.-------- U.
                                                     11.8        11. 8     2, 976, 4291 _--__-.....-........____        _____           _.      2, 976,   4291 ...... _            2, 976, 429    100. 0      (37)
    West Atchafalaya Basin ...-.--    38131. 8        8. 9        8. 9     3, 572, 983 17, 012, 0911.------1 17, 012, 091 __----------         20, 585,   074    32, 714, 926     53, 300, 000     38. 6      (37)
    East.Atchafalaya Basin .---------- 117. 6           .21        .2          82,845 3, 675, 2691 -.... 3, 675, 269 _----------                3, 758,   114    32, 441, 886     36, 200, 000     10. 4      (68)
    Ring levees: Simmesport, Mel-
      ville, Morgan City, and Ferri-
      day----------------------           3 26.9------------                 -----------      ----------------                                                   9 6, 200, 000   396, 200, 000      0.       (40)

                   ---
        Total__ ____________________      2, 129. 2 1, 873.2 1, 353. 3 41706, 329,896 122, 083, 871              122, 083, 871   33, 278, 35542
                                                                                                                                              795, 135, 412     209, 590, 374    938, 786, 382   4377    7   26, 267

     1 Regardless of grade and section.
     2 Includes 14 miles in main line diversion levee (increased 0.3 mile due to closer surveys); 2.7 miles in Ramsey Creek levee; and 2.9 miles in Sals Creek levee.
     3 Increased 0.6 mile due to closer surveys.
     4 These figures include yardage to be abandoned in the course of construction, the total to be abandoned being 65,939,404 cubic yards as follows: Memphis district, 24,125,442
cubic yards; Little River drainage district, 145,000 cubic yards; upper St. Francis levee district, 704,691 cubic yards; lower St. Francis levee district, 9,263,502 cubic yards; White
River levee district, 9,343,624 cubic yards; Reelfoot levee district, 1,832,875 cubic yards; Slough Landing Neck Dike, 86,335 cubic yards; upper Yazoo levee district, 2,749,415 cubic
yards; Vicksburg district, 7,592,662 cubic yards; lower Yazoo levee district, east bank, Mississippi River, Miss., 1,628,770 cubic yards; upper Tensas levee district, south bank,
Arkansas River, Ark., 10,042 cubic yards; west bank, Mississippi River, La., 5,953,850 cubic yards; second New Orleans district, 34,221,300 cubic yards; lower Tensas levee district,
12,520,130 cubic yards; Atchafalaya (front) levee district, 7,498,027 cubic yards; Lafourche levee district (above Bonnet Carre), 7,493,422 cubic yards; Barataria levee district, 1,709,421
                                                                                                                                                                                                                       M
                                                                                                                                                                                                                       0
cubic yards; Pontchartrain levee district (about Bonnet Carre), 741,542 cubic yards; Lake Borgne levee district, 842,268 cubic yards; Red River, Atchafalaya and Bayou Boeuf levee
district, 3,416,490 cubic yards. Some of these figures have been revised due to closer surveys having been made.
     5 These figures revised due to closer surveys and new locations.
     6 The estimated final contents equals contents June 30, 1934, plus the yardage required to complete to grade and section, minus the yardage to be abandoned in the course of
construction.
     7 Percentage of completion arrived at as follows: Subtract the amount required to complete from the estimated final contents, dividing the remainder by the amount given under
estimated final contents.
     8 Includes 6.3 miles of Cairo drainage district (Mississippi River) levee (increasd 0.1 mile due to closer surveys) and 3.4 miles of Cairo front (Mississippi River) levee.
     9 Includes 5.2 miles from Cache River levee to lower end of Cairo sea-wall (Ohio River); and 6.1 miles of Mounds and Mound City, Ill., levee (increased 4.7 miles to include
levees around Mounds and Mound City, Ill., placed under contract during the fiscal year).
     t0Increased 629,000 cubic yards to include levees at Mounds and Mound City, Ill.                                                                                                                                  O
     11Includes 629,000 cubic yards to include Mounds and Mound City, Ill., levees.
     12Revised, to include 629,000 cubic yards Mounds and Mound City, Ill., levees.
     13Includes 34.2 miles of Birds Point-New Madrid set-back levee (decreased 0.3 mile due to closer surveys); 84.3 miles of Mississippi River front line levee (increased 1.1 miles
due to closer surveys and new locations); and 13.7 miles of New Madrid-Sikeston Ridge (St. Johns Bayou) levee (this levee has been deducted from the lower St. Francis levee
district and placed in the upper St. Francis levee district, where it rightfully belongs).
     14Revised, includes mileages stated in footnote 13.
     15Revised. See footnote 13.
     16Increased 2,702,885 cubic yards by transfer of St. John Bayou levee from Lower St. Francis levee district. See footnote 13.
     17Abandoned due to construction of new levee.
     isIncludes 213.4 miles of Mississippi River front line levee (decreased 0.7 mile due to closer surveys and new locations), also reduced 13.7 miles due to removing the New Madrm-
Sikeston Ridge (St. Johns Bayou) levee from this district and placing same under the upper St. Francis levee district.
     19Revised, includes mileages stated in footnote 18.
     2oRevised, see footnote 18.
     21Decreased 2,702,885  cubic yards by transfer of St. Johns Bayou levee to Upper St. Francis leveedistrict. See footnote18.
     22Includes 6.6 miles of Laconia back circle levee (decreased 0.6 mile due to closer surveys and new locations); and 66.9 miles of Mississippi River front line levee (decreased 1.4
miles due to closer surveys and new locations).
    23Revised, see footnote 22.
     24Increased 0.1 mile due to closer surveys.
     25Decreased 0.1 mile due to closer surveys.
   26 Partiallyprotected.
    27Increased 0.3 mile due to closer surveys.
    28Revised due to increase in estimated final contents.
    29Includes fuse plug levee not to be enlarged to adopted grade and section.
    30Indeterminable.
    31Above Bonnet Carre spillway.
    33Below Bonnet Carre spillway.
    33Estimated amount required to reconstruct levees due to caving banks.
    34This figure revised due to closer surveys.
    3 Included in Lafourche levee district.                                                                                                                                               O
    36 Included in Atchafalaya (front) levee district.
    37Included in Red River, Atchafalaya, and Bayou Boeuf levee district.
    38Includes 8.3 miles of Bordelonville-Hamburg levee.
    39Revised due to inclusion of Ferriday levee.
    40Included in respective levee districts.
    41Includes yardage to be abandoned in the course of construction see; Annual Report, 1933. The total shown in the 1933 report, column "Contents 1933" has been revised by an
addition of 629,000 cubic yards, Ohio River (Mounds and Mound City, Ill., levees).
                                                                                                                                                                                          o
    42Includes 65,939,404 cubic yards not up to project grade and section to be abandoned in the course of construction.
    43Percentage of 77.7 arrived at by subtracting 65,939,404 cubic yards (to be abandoned in the course of construction) from 795,135,412 (contents 1934), and dividing theremainder
by 938,786,382 (estimated final contents). The percentage of completion of works under section 1 of the project excluding Boeuf and Atchafalaya flood ways and ring levees (143,390,521
cubic yards) is 88.2.
                                                                                                                                                                                          O




                                                                                                                                                                                          03
                                  MISSISSIPPI RIVER COMMISSION                                                        1501
TABLE 3.-Yardage placed during 12 months, from July 1, 1933, to June 30, 193,4
  in repairing levees on tributaries of the Mississippi River threatened or
   destroyed by flood, including the flood of 1927, as provided for in sec. 7 of
  the act of May 15, 1928


                                                                                 Built       Total Remain-
                              Levee district                                     since       built     ing   Percent
                                                                                July 1,     under    to be  complete
                                                                                  1933     section 7  built

                  ROCK ISLAND ENGINEER DISTRICT                                  Cubic        Cubic       Cubic
Iowa River:                                                          yards   yards                        yards
     Louisa levee districts nos. 8 and 11, Iowa....-----------------  7, 187  51,955                       None        100. 0.
     Levee district no. 14, Louisa County, Iowa.---------------- 4, 050       26, 222                      None        100. 0
     O. L.Asby....         ------------------------------------- ---------     2, 006                      None        100. 0
Cedar River: Muscatine County, Iowa---------------------              5, 449  22, 083                      None        100.0
Mill Creek: Vicinity Milan, Ill----------- --------------------------. 508                                 None        100. 0
Fox River: Mississippi-Fox River drainage district, Missouri-.        6,992    6, 992                      None        100. O0
Ellison Creek: Vicinity of Shokoken, Ill------------------------      3, 462   3, 462                      None        100. C
                    ST. LOUIS ENGINEER DISTRICT

Cinque Hommes Creek:- Perry County, no. 3------------------------12, 600                                    None       100. 0
Mississippi River: Perry County, no. 3, Mo...-------------------------- 1, 437                              None       100.0
Meredosia Lake Levee-------------------------------------------.....                  6, 270                None       100.0
Lost Creek Levee..--    ---------....................------------------------- 4, 139 4, 139                None       100. 0
                     MEMPHIS ENGINEER DISTRICT

Arkansas River:
     Conway County levee district no. 1--.........----------------.....----------.......           44, 703   None      100.0
         Do------------------------------------------------........--.........                     23, 022   None      100.0
         Do----......--.....--               ----------------------------------...........         26,147    None      100. O0
     Conway County levee district no. 2--------------------..---------..                            7, 183   None      100.0
         Do....---------------------------------------------                           11,  784 11,    784   None      100. 0
     Conway County levee district no. 6-----------------------------5, 986                                   None      100. 0
         Do----       -------------------------------------- 49, 316                               49,316    None      100.0
         Do----      ----------------------------------------                               658        658   None      100.0
     Crawford County levee district-....--------------------- 104, 037                            104, 037 947, 963     11. 1
     Meredosia Lake Levee--.---------------------------------                                   -   9, 216   None      100. 0
     Dardanelle drainage district, Yell County, Ark ----............                               33, 439   None      100. 0
     Faulkner County levee district no. 2.....---------------------------- 38, 977                           None      100. 0
     Fourche Island levee district---- -----------------------------                               57, 516   None      100. 0
     Fourche Place levee district---- -------------------------------                               1, 331   None      100. 0
     Logan County levee district no. 1-.--------------------------------- 1, 500                             None      100. 0
     Logan County levee district no. 3-------- --------------------------- 6, 500                            None      100.0
         Do----        ----------------------------------------------                              17, 374   None      100. 0
     Oberste Levee---          -----------------------------------------                            3, 979   None      100. 0
     Perry County levee district no. 1-------------------------------                               8, 693   None      100.0
         Do----        ----------------------------------------------- 3,730 None                                      100.0
         Do----       ------------------------------------------------                                 811   None      100.0
     Pope County, Ark., drainage and levee district no. 1-------                         8, 193     8, 193   None      100. 0
     Yell County levee district no. 1--------------------------.-------- 33, 698                             None      100.0
         Do----        ----------------------------------------------- 2, 932                                None      100. 0
Black River:
     Curia Creek levee district----              -------------------------------- 16, 929                    None      100. O0
     Western Clay drainage district no. 2--- -------------------------- 3, 924                               None      100. 0
         Do----        ----------------------------------------------- 1, 516                                None      100. 0
Little Red River:
     Little Red River levee district no. 1--------- ----------------------- 46, 656                          None      100. 0
     Little Red River levee district no. 2----------------------------13, 199                                None      100. 0
Neosho River:
    Allen levee district----           -------------------------------------- 4, 755                         None      100. 0
     Brown levee-------             ---------------------------------------                         3, 085   None      100. 0
     Brogan levee district--------- ------------------------------                                 13, 918   None      100. 0
     Council Grove, Kans., improvement district--....--..........--------...----------              9, 868   None      100. 0
     Delos-Johnson levee district---------------------------...-------..                            3, 944   None      100. 0
     Dutton levee district----             ----------------------------------- 14, 319                       None      100. 0
     Edwards-Marsh-Bell levee district--- --------------------------                                6, 269   None      100. 0
     Gibbons levee district----             -----------------------------------                     1, 562   None      100. 0
     Hewitt levee district---           -------------------------------------                       2, 717   None      100. 0
    Heath levee district---             ------------------------------------- 16, 803                        None      100. 0
    Isett-Blackburn levee district---- ----------------------------- 10, 365                                 None      100. 0
     Labette County levee district----                -----------------------------                 2, 103   None      100. 0
     Linden levee district----            -----------------------------------                      11, 399   None      100. 0
     Lawrence levee district----              ---------------------------------- 16, 080                     None      100. 0
     Nation levee district--          --------------------------------------                        2, 698   None      100. 0
     Nixon levee district        ----------------------------------------                           4, 949   None      100. 0
     Rosenthal levee district ...----          ----------------------- ---------- 35, 710                    None      100. 0
     Sheltz levee district---          -------------------------------------                        7, 984   None      100. 0
    Wikle levee district--           --------------------------------------                        15, 665   None      100. 0
St. Francis River:
     Craighead County, Ark., drainage district no. 12 ......... 30, 000                            30, 000   None      100. 0
     Craighead County, Ark., drainage district no. 17- ......                          20, 843     20, 843   None      100. 0
     Craighead County, Ark., drainage district no. 26 ........                         60, 330     60, 330   None      100. 0
1502           REPORT                   OF CHIEF OF              ENGINEERS,                 U.      S.    ARMY,          1934


TABLE   3.-Yardage placed during 12 months, from July 1, 1933, to June 30, 1934,
   in repairing levees on tributaries of the Mississippi River, eto.-Continued


                                                                                             Built          Total        Remain-
                                        Levee district                                       since          built          ing    Percent
                                                                                            July 1,        under          to be  complete
                                                                                              1933        section 7       built


                 MEMPHIS ENGINEER DISTRICT-continued
                                                                                                Cubic         Cubic       Cubic
St. Francis River-Continued.                                                                    yards         yards       yards
    St. Francis drainage district, Clay and Green Counties-------.........                                     23, 946      None     100. 0
        Do..          -----------------------------------------                                            ..   7, 635      None     100. O0
        Do.....------------------------------------------------                                                43,951     151,049     22. 5
        Do-__--......           --
                           . ___-___---                               -_______-                454, 836       454, 836      None     100. 0
    Dunklin County, Mo., levee district no. 4----------------                                    12, 800       12, 800      None     100. 0
    Dunklin County drainage district no. 25 __.----___ --                                        .. -__ __     10, 102      None     100. 0
        Do'..............--------------------------------------------------11, 621                                          None     100. 0
        Do---          --          --------------------------------------------                                53, 614      None     100. 0
        Do- --..-                     _        ------------_                                     16, 569       16, 569      None     100. 0
    Dunklin County drainage district no. 2-------                                 _ _--- ...--...--..           7, 657      None     100. 0
    Mingo drainage district                         -----                          -------                     11,890       None     100. 0
    Mississippi County drainage district no. 17-----------------------                                         11, 759      None     100. 0
        Do..........--------------------------------------------------                                         20, 041      None     100. 0
        Do -- ......-- . . . _..                 ..             . _. . . . . . . . . . . .              ..    190, 535    276, 425    40. 8
    Mississippi County, Ark., drainage district no. 17------                                   325, 450       325, 450    400, 000    55. 0
    Mud Slough drainage district                      ---                       --------                        7, 682      None     100-0
Verdigris River: Hall levee -----                    -1---------                                              1,   921      None     100. 0
White River:
    Jackson.County levee district no. 3                                                     ...........         3, 965     None      100. O0
           Do-     ....----------   -      -... . . . .   . -------....
                                                             . . . . . .    ..   . . ..--             .        2, 296      None      100. 0
     Gibson levee district-.                                              -   _ - -__        -    12, 500                  None      100. O0
     Jackson County levee district no. 2                  ----
                                                             ------                               39, 158                  None      100. 0
         Do-. _......   . . . . . . . . . . . . ..              . . . . .   .         --           8, 114                  N one     100. 0
         Do--                              .          .         .        .- . ---- _------ 14,038                          None      100.0
     Padgett Island levee district                                                                32, 283                  None      100. O0
     Village Creek-White River levee district_                                                    19, 574                  None      100. 0
         D o -.. .... ....      .... ... ....     .... -. ....--                                  12,172                   N one     100. 0
         Do .----- -----     -----   -----  -----    --- -         - ----                14, 603  14, 603                  N one     100. O0
     White River levee district, Woodruff, Prairie, and Monroe
       Counties, Ark..          --------------------------------                 ----------      134, 352                  None      100. O0
         Do -- ---    -- -- -- -- -- -- -- -- -- -- -- -- -- --                          10, 706  10, 706                  None      100. 0
     Phillips County drainage district no. I of Phillips and Mon-
       roe Counties, Ark.___________________________________                                      11, 912                  None      100. O0
                        VICKSBURG ENGINEER DISTRICT

Red River (left bank):
     Bossier levee district, Louisiana .........-                                                          115, 656         None  100. O0
     Ogden levee district, Arkansas             --------------------------------                            32, 369         None  100. 0
     Red River levee district no. 1, Arkansas ------------------                          -          -      28, 271         None  100. 0
     Hempstead County levee district no. 1, Arkansas -------- ----------                                    40, 115         None  100. 0
     Orton levee district, Arkansas_--_                                                         58, 061    122, 943         None  100. 0
     Saline levee and drainage district, Louisiana_-_.........                                             240, 881         None  100. O0
     Grand Bend levee repair      -...-......................                                                9, 719         None  100. 0
Red River (right bank):
     Garland levee district, Arkansas                          _........                  -            -   214, 004         None  100. 0
     Miller levee district no. 2, Arkansas...                    ----------         ------                  21, 733         None  100. 0
Arkansas River (left bank):
     Farelly Lake levee district, Arkansas __175,                                                                639        None  100. 0
     Farelly Lake levee district, Arkansas (placed under par. 2,
      of sec. 6, act of May 15, 1928)_--                              --     -                333, 927 1 768, 255         2None   100. O0
Tallahatchie River (left bank):
     Locopolis drainage district, Mississippi -........                                                      5, 764         None  100. 0
     Matthews Bayou drainage district, Mississippi---                                     .......            9, 538         N one 100.0
     Panola-Quitman drainage district, Mississippi ...--.                                       11,094      80, 007       2None   100. O0
     Patterson Bayou drainage district, Mississippi ........                           ----....              7, 553         None  100.0
     Private levee near Roane, Miss -                                      -                      6, 543      6, 899        None  100. 0
Tallahatchie River (right bank):
     Newsum Lake levee district, Mississippi-......                                 - -                  .  16, 617      2 None   100. O0
     Private levee near Glendora, Miss-                       -..........                                     1, 036 ............
Yazoo River (left bank):
     Eden levee district, Mississippi---------------------------------                                       9, 845         None  100. 0
     Belzoni levee district, Mississippi_                      -                                  2, 949      2, 949        None  100. 0
Yazoo River (right bank): Atchafalaya levee district, Missis-
  sippi .............----------                            -             -     -------                      10, 764         None  100. 0
  I Includes 32,253 cubic yards placed by local authorities.
  2 Amount shown in 1933 annual report represented yardage necessary to raise levees of whole system to
new grade and section. Work under contract by United States completed.
                                  MISSISSIPPI             RIVER         COMMISSION                                        1503
TABLE 3.-Yardage placed during 12 months, from July 1, 1933, to June 30, 1934,
  in repairing levees on tributaries of the Mississippi River, etc.-Continued

                                                                                   Built       Total       Remain-
                                                                                   since        built        ing    Percent
                                                                                  July 1,      under        to be  complete
                                                                                   1933       section 7     built


                  SECOND DISTRICT, NEW ORI EANS
Red River (right bank):
   Red River and Bayou des Olaises levee and drainage dis-                     Cubic   Cubic                 Cubic
     trict:                                                                     yards  yards                 yards
        Barbins landing levee .......                                                   36, 428               None            100. 0
        Bayou Leaunoir levee................                                            18, 996               None            100. 0
        Barbins Landing levee (lower)- . . ........                 .............       40, 091               None            100. 0
        Barbins Landing levee (upper)----- ----------------------                       41, 730               None            100.0
        Bettevy levee     --------------------------------                 ----------   11, 691               None            100. 0
        Brouillette levee    ------------------------------
                            ..                                             ----------   19, 380               None            100. 0
        Johnsons cross levee.....--------------------------------------                  8, 924               None            100. 0
        Normans Landing levee------------------------                        ---------  40, 167               None            100. 0
Atchafalaya Basin:
   Cypremont Crevasse .             ...................-------------------             342, 500                None           100. 0
   Port Barre-South levee..........------------------------------------.........22, 170                        None           100. 0
       Total.........................---------------------------------------    1,563, 978 5, 046, 305


   The following is a statement of the net expenditures by the United
States Government, under supervision of the president Mississippi
River Commission (including all expenditures under sec. 7 of Flood
Control Act approved May 15, 1928), for the construction and repair
of levees; and the amounts expended for similar purposes by States,
levee districts, and communities interested, from 1882 to December
31, 1933, covering cost of yardage placed, rights-of-way, interest,
engineering expenses, repair work, high-water expenses, crevasse
closing, etc.:

                             Net   expenditures by              Net expenditures by
                               United States   from              United States from
                               Government funds                  contributed funds               Expended by
                                                                                                   State and            Total
                              Districtslocal                                                            organi-
                                                                                  New proj-
                                                                                                    zations
                                                                                                    zations
                             Old project      New project       Old project


Northern-----.----.    $3, 067, 923. 04      $19, 287. 55 $1, 156, 801. 30         $9, 643.   78------------..     $4,253,655.67
Rock Island engineer _-------------- 1601, 854. 44             .....-----------.2 288, 596.   30 $5, 052, 490. 15 5, 942, 940. 89
St. Louis engineer_---------------- 3 1, 479, 820. 81------------                 734, 835.   79 13, 443, 027. 75 15, 657, 684. 35
Memphis engineer.... 21, 898, 591. 58 430, 372, 281.90 4, 592, 925. 15             58, 629.   15 57, 701, 370. 72 114, 623, 798. 50
Vicksburg engineer.... 30, 257, 665. 36 633, 705, 604. 72 6, 054, 329. 85 7 30, 536.          56 42, 653, 353. 01 112, 701, 489. 50
Second New Orleans
engineer- ..-.-----...26, 633, 403. 70 ~26, 810, 626. 24 4, 373, 938. 37          11, 636.   74 96, 223, 163. 91 154, 052, 768. 96
       Total       ..----------81, 857, 583. 68 92, 989, 475. 66 16, 177, 994. 67 1, 133, 878. 32 215, 073, 405. 54 407, 232, 337. 87

  1Includes $29,400.30, expended from the emergency fund for flood control on tributaries of the Mississippi
River under the provisions of sec. 7 of Flood Control Act approved May 15, 1928.
  2 Includes $2,079.22, contributed and expended under provisions of sec. 7.
  3Includes $10,721.87, expended under provisions of sec. 7.
4 Includes $1,428,618.39, expended under provisions of see. 7; and $981,681.50, expended from National
Recovery Administration funds.
  5 Includes $167.04, contributed and expended under provisions of sec. 7.
6 Includes $847,968.94, expended under provisions of sec. 7; and $259,485.27, expended from National
Recovery Administration funds.
7 Includes $195.52, contributed and expended under provisions of sec. 7.
8Includes $495,574.33, expended under provisions of sec. 7; and $342,940.01, expended from National
Recovery Administration funds.
         91536-ENc         1934--95
1504         REPORT OF CHIEF OF ENGINEERS,                                              U.    S. ARMY,            1934

   Total United States and contributed funds expended under super-
vision of the president, Mississippi River Commission, for all pur-
poses, including expenditures for revetments, levees, dredging, sur-
veys, etc., from June 28, 1879, to June 30, 1934, amount to $401,433,-
818.41, of which $2,951,971.40 was expended from the emergency fund
for flood control on tributaries of the Mississippi River (sec. 7, Flood
Control Act approved May 15, 1928), this being the entire amount
expended from that fund.
   The following is a table (supplementary to table on p. 1502) show-
ing net total expenditures for levees to June 30, 1934 (with exception
of amounts expended by State and local organizations which are not
of record beyond Dec. 31, 1933) :

                                Net expenditures by United                  Net expenditures by United
                                 States from Government                      States from contributed
        Districts                 funds                                        funds                                      Total

                                  Old project           New project           Old project         New project

Northern -----------.. $3, 067, 923.          04            $19, 287. 55       $1, 156, 801. 30       $9,   643. 78    $4, 253, 655. 67
Rock Island engineer__-____-------            -         I 1 603, 495. 80              _      _     2 288,   386. 07        891, 881. 87
St. Louis engineer____--------                          8 1, 547, 769. 46   -----------              767,   256.41      2, 315, 025. 87
Memphis engineer --.-      21, 898, 591.      58    4 35, 247, 887. 45          4, 592, 925. 15     6 66,   452. 74    61, 805, 856. 92
Vicksburg engineer ...     30, 257, 665.      36    a 35, 098, 186. 66          6, 054, 329. 85     731,    369. 99    71, 441, 551. 86
Second New Orleans
  district.------------    26, 633, 403.      70    R   32, 750, 611. 04       4, 373, 938. 37        11, 636. 74      63, 769, 589. 85

      Total...-------....---.    81, 857, 583. 68   105, 267, 237. 96         16, 177, 994. 67    1, 174, 745. 73     204, 477, 562. 04

  1 Includes $30,831.43, expended from the emergency fund for flood control on tributaries of the Mississippi
River under the provisions of sec. 7 of Flood Control Act approved May 15, 1928.
2 Includes $2,079.22, contributed and expended under provisions of sec. 7.
3 Includes $13,832.35, expended under provisions of sec. 7.
4 Includes $5,341,759.72, expended from National Recovery Administration funds and $1,554,559.19,
expended under provisions of sec. 7.
  5 Includes $4,334.97, contributed for National Recovery Administration work and $167.04, contributed
under provisions of sec. 7.
6Includes $853,733.71,         expended under provisions of sec. 7; and $1,173,762.16, expended from National
Recovery Administration funds.
7 Includes $620.52, contributed and expended under provisions of sec. 7.
8 Includes $496,814.72, expended under provisions of sec. 7, and $2,873,579.74, expended from National
Recovery Administration funds.

                                          FLOODWAYS AND SPILLWAY


   Birds Point-New Madrid floodway.-All work in connection with
the construction of the drainage ditches and appurtenant structures
necessary to carry the drainage intercepted by the Birds Point-New
Madrid floodway levee has been completed. With the exception of
the short gap at the Missouri-Pacific Railroad crossing, the construc-
tion of the setback levee has been completed, and flowage easements
and fee simple titles have been secured over 58 percent of the lands
in the floodway. Agreements have been reached on an additional 5
percent and the remaining 37 percent is expected to be secured as
rapidly as court procedure will permit.
   Boeuf Basin. Surveys for the location of the protection levees
have been made. During fiscal year 1931 comprehensive revision
studies were made for Boeuf overflow basin and estimates on a num-
ber of alternate plans were prepared. During the fiscal year 1932
surveys and studies were made to determine the feasibility of di-
verting excess Mississippi River waters through a ditch located in
the thalweg of the Boeuf Basin, the original pilot ditch to be en-
                   MISSISSIPPI   RIVER COMMISSION                1505
larged by erosion. During the fiscal year 1933 diversion studies
were continued. Plans and estimates for the protection of West
Monroe, La., were completed. The construction of protection levees
for the south portion of West Monroe has been completed. Plans
and estimates for the protection works on the east bank of the Ouach-
ita River at Monroe, La., and vicinity, begun during the fiscal year
1933, were completed during the fiscal year 1934. The construction
of the protection works on the east bank of Ouachita River at Mon-
roe was approximately 60 percent completed during the fiscal year
1934.
   Atchafalaya Basin.-Construction of the, West Atchafalaya Basin
levee from Palmetto to Dauterive and of the East Atchafalaya Basin
levee from Maringouin to Bayou Sorrel was continued. These levees
are being constructed to an interim grade, generally 6 feet below final
net grade. Construction has proceeded at a satisfactory rate and
with much less difficulty than was anticipated on account of the
nature of the material. The first lift work between the points
named was approximately 82 percent complete at the end of the
fiscal year. Construction of second lift to full grade and final sec-
tion will be undertaken early in the fiscal year 1935. Extension of
the West Atchafalaya Basin levee from Grand Bayou to Lake Fausse
Point, in connection with a cut-off from Lake Rond to Grand Lake,
and of the East Atchafalaya Basin levee from Maringouin north to
Lottie, and from Bayou Sorrel south to Little Bayou Pigeon, was
begun and continued throughout the year. In addition, construction
of a section of the lower part of the West Atchafalaya Basin levee,
south of Grand Lake, was commenced with different types of equip-
ment in order to determine what location and design will offer the
most efficient construction methods and provide effective flood protec-
tion at a reasonable cost. Experimental dredging operations in the
basin were continued throughout the year to develop an adequate
main channel and efficient auxiliary channels and thus improve the
discharge of flood waters. In connection with the dredging opera-
tions, the required hydrographic surveys were made, and compara-
tive cross sections, velocity observations, gage readings, and thalweg
soundings were taken at frequent intervals to determine the results
of the work.
   Bonnet Carre spillway.-The Bonnet Carre spillway structure has
been completed and the side levees of the floodway are complete ex-
cept for closure of gaps at the highway and railroads, where elevated
crossings are now under construction. With the exception of two
minor cases awaiting final court action, all rights-of-way and flowage
easements have been obtained and paid for, the claims of the rail-
roads having been satisfactorily settled during the fiscal year 1934
at conferences between the Chief of Engineers and representatives
of the railway companies. Construction work during the fiscal year
consisted of raising low sections of the guide levees in the swamp
section, where abnormal shrinkage and settlement had occurred, and
of clearing in the wooded area to provide for efficient distribution of
flow. In an emergency the floodway can be used. The spillway
structure consists of a weir divided into separate needle-control
openings by piers spaced 22 feet on centers, a rear concrete apron
 1506        REPORT         OF OCHIEF          OF ENGINEERS,                U.      S.    ARMY,         1934


protected by riprap, a concrete fore apron with dentiled baffles, and
an articulated concrete slab talus 6 inches in thickness resting upon
layers of riprap and gravel. The principal data of the spillway and
floodway are as follows:
  Location, 32.8 miles above Canal Street, New Orleans, and 942.4 miles below
Cairo, Ill.
High-water elevation, 24.3 mean Gulf level corresponding to elevation 20
Carrollton gage.
  Project discharge, 250,000 cubic feet per second.
Length of spillway between abutments, 7,698 feet.
Clear opening, 350 wiers, at 20 feet, 7,000 feet.
  Spillway structure completed February 10, 1931.
  Spillway cost, $3,607,587.69.
Width of floodway between center lines of levees at lake, 12,000 feet.
Length of floodway, 5.7 miles.
Area of floodway, 7,860 acres.
Maximum height of levees, 19.3 feet.
  Total length of side levees, 11.8 miles.
Floodway completed, 99.9 percent (June 30, 1934).
Floodway cost to date, $3,339,007.59.
Rights-of-way, flowage and damage cost to date, $6,182,028.67.
   The following table gives in detail the status of the work on the
floodway at the end of the fiscal year:

                                                                                 Estimated         Total in        Percent
                                   Section                                       total under        place         completed
                                                                                  contract          place           to date


                                                                                 Cubic yards Cubic yards Cubic yards
Lower highland--.....          ....-----------------------------------------        560, 000   516, 506      1 100. 0
Upper highland.....----------.--------------------------------                      400,000    376,796                 1100.0
Lower swamp:
       Hydraulic fill-------------------------------------.                       2, 300, 000     3, 450, 000          1100.0
       Superimposed fill.......----------------------------------                 2 250, 000         375, 000           199. 9
       Cut-off ditches .------------------------------------                      2 360, 000      3 547, 079           1 100. 0
Upper swamp:
   Hydraulic fill----------.....         -----------------------------           23, 000,000      4, 443, 696          1   100. 0
   Superimposed fill...-----------------------------------                         2 310, 000        453, 000          1 100. 0
   Cut-off ditches ...----------------------------------------------               2470, 000       4716, 468           1 100.0


  1 Complete except for gaps at highway and railroad crossings.
  2 50 percent excess permissible.
  8Includes 7,079 cubic yards placed in cross dikes.
  4 Includes 11,468 cubic yards placed in cross dikes.


  The costs and net expenditures for the Bonnet Carre spillway
during the 12-month period ending June 30, 1934, which were in-
curred in the second New Orleans district, were as follows:

                                                              Regular funds               National Recovery Admin-
                                                                                               istration funds
                    Allotment-

                                                           Costs        Net expendi-            Costs           Net expendi-
                                                                           tures                                   tures


                         ......-------------
Construction Bonnet Carre---                            $124, 086. 80    $116, 181. 42
Rights-of-way, flowage, and damages, Bonnet
  Carre....---------------    ---------------- 4, 361, 416. 88          4, 369, 201.52
Bonnet Carre floodway clearing and cleaning                                             $89,947. 84
                                                            .--------------.--------------                         $89,947.84

      Total...--------------     --------------        4, 485, 503.68   4, 485, 382. 94         89, 947. 84         89, 947. 84
                                  -MISSISSIPPI RIVER COMMISSION                                            1507

   The net total expenditure on the Bonnet Carre spillway to June 30,
1934 (all under the new project), amounted to $13.128A466.42.

                                 WATERWAYS            EXPERIMENT          STATION


   All experiments of this station are conducted for the purpose of
aiding in the development of plans for flood control, navigation,
harbor improvement, etc., with a view to obtaining the most eco-
nomical and efficient engineering plans. While the primary mission
is to determine the solution of problems relative to the Mississippi
River and its tributaries, many studies have been undertaken under
authority of the Chief of Engineers for districts outside the lower
Mississippi Valley division. During the past year a total of 13
experiments were undertaken for 8 engineer districts outside of
the lower Mississippi Valley division. All experiments performed
have a direct practical application to the work of the Corps of
Engineers, United States Army, in its administration of the rivers
and harbors of the Nation. The waterways experiment station
holds as an unvarying principle the maintenance of closest contact
with the field in all experimental work. This contact is kept both
by station personnel visiting the prototype and by engineers from the
field visiting the station while any particular model study is in
progress.
   From July 1, 1933, to June 30, 1934, the following
have been undertaken:
                                                                                               .experiments
                              Scale of mod-                                                 Performed for (Missis-
Name given to experi-         el: l=hori-     Purpose of the experiment or scope of the
                                                model (status of tests). All kinds of        sippi River Com-
       ments                   zontal, d=       mechanical analyses                          mission and outside
                                 vertical                                                    districts)-
                          I
Island No. 35, Missis-        1, 1:600; d,     To develop methods of channel improve-      Mississippi River
  sippi River.                  1:150.           ment for navigation (experiment com-        Commission.
                                                 pleted).
Fort Chartres, Missis-        1, 1:1,000; d,   To develop dike system to improve           District engineer, St.
sippi River.                    1:125.          depths over low-water crossings (origi-    Louis.
                                                 nal experiment completed; subsequent
                                                 experiment in progress).
Brooks Point, Missis-         1, 1:1,000; d,   To develop dike system to improve               Do.
sippi River.                    1:125.          depths over low-water crossings (ex-
                                                 periment completed).
Toney's Towhead, Mis- 1, 1:1,000; d,           To develop dike system to improve con-      Mississ'ppi River
sissippi River.         1:125.                  ditions for navigation (experiment         Commission.
                                                 completed).
Head of Passes, Missis-       1, 1:600; d,     To improve navigation, Head of Passes,      District engineer, first
sippi River.                   1:150.           Mississippi River (experiment approx-      New Orleans dis-
                                                 imately completed).                        trict.
Island No. 20, Missis-        1, 1:1,000; d,   Study of effects of regulating works on     Original study for Mis-
  sippi River.                   1:125.         channel location and depths (original       sissippi River Com-
                                                experiment completed; subsequent            mission; subsequent
                                                 experiment in progress).                   study for district en-
                                                                                            gineer, Memphis.
Robinson Crusoe Is-           1, 1:1,000; d,   Study of proposed regulating works (in      District engineer,
  land, Mississippi              1:125.          progress).                                 Memphis.
  River.
Southwest Pass, Mis-          1, 1:1,000; d,   Study of proposed regulating works          District engineer, first
sissinni River.                1:125.           (experiment completed).                    New Orleans dis-
                                                                                            trict.
Cat Island, Mississippi 1, 1:1,000; d, Study of proposed regulating works                  District engineer,
  River.                   1:125.        (experiment in progress).                          Memphis.
Savannah River -         1, 1:200; d, To develop system of regulating works
                       -----                                                               District engineer, Sa-
                           1:30.        to improve navigation (experiment in                vannah.
                                        progress).
Diamond Point and 1, 1:1,000; d, To determine the effects of cut-offs at                   Mississippi River
  Yucatan Point, Mis-      1:100.       Diamond Point and Yucatan Point,                    Commission.
  sissippi River.                       Mississippi River, miles 560 to 6501
                                         (first phase of experiment completed).
1 Distance in miles below Cairo.
1508        REPORT OF CHIEF OF ENGINEERS, U.                               S. ARMY,        1934



  Namegiven
Name       to experi-
      given to experi-     S:    ohmd- Purpose
                           el: l=hori-  model of the experiment
                                               (status               scope
                                                       of tests). orAll    of the
                                                                        kinds   of          ormedRiver
                                                                                                    for (Missis-
                                                                                         sippi            Com-
       ments               zontal, d=   mechanical analyses                              mission and outside
                             vertical                                                    districts)-

Buckbridge Crossing,       1, 1:1,000, d,   Study of dikes and dredging for naviga- Mississippi River
Mississippi River.           1:100.          tion improvements, Mississippi River,      Commission
                                              miles 633 to 638 1 (in progress).
Racetrack   Towhead,       1, 1:1,000; d,   To determine the effects on stages, slopes,     Do.
Mississippi River.           1:100.          and stream bed of dikes and dredging,
                                              from Vicksburg to Diamond Point
                                              cut-off, Mississippi River, miles 605 to
                                              626 1 (in progress).
Togo Crossing, Missis-     1, 1:1,000; d,   To determine methods of improving nav-          Do.
sippi River.                 1:100.          igation conditions at Togo Crossing,
                                              Mississippi River, miles 627 to 633 1
                                              (first phase of experiment completed).
Atchafalaya River Ba-      1, 1:1,500; d,   Study of the effects of changes in the regi-    Do.
sin.                         1:100.          men of the effluents of the Atchafalaya
                                              River, Krotz Springs to Grand Lake
                                              (in progress).
Fitler Bend, Missis-       1, 1:500;   d,   To determine the effects of dikes and          Do.
sippi River.                1:150.           dredging in the vicinity of Fitler
                                              Bend, Mississippi River, miles 543 to
                                              561 1 (in progress).
Cow Island, Atchafa-       1, 1:400; d,     Study of bed load movement and cur-            Do.
laya River.                 1:100.          rent directions with cut-off effected
                                              (completed).
Lake Long bifurcation,     1, 1:300; d,     Study of bed load movement at this             Do.
  Atchafalaya River.          1:50.          stream fork (completed).
Giles Bend and Glass-      1, 1:1,000; d,   To determine the effects on bed, banks,        Do.
  cock Point, Missis-         1:100.         and water surface elevations of cut-
  sippi River.                                offs at Giles Bend and Glasscock
                                              Point, Mississippi River, miles 650
                                             to 763 1(first phase of experiment com-
                                              pleted).
Morville Landing-          1, 1:1,000; d,   Improvement of low-water channel for           Do.
Esperance Point, Mis-        1:100.          navigation at Esperance Point, Mis-
sissippi River.                              sissippi River, miles 715 to 722 1 (in
                                              progress).
Waterproof cut-off, Mis-   1, 1:1,000; d,   To determine a method of improving             Do.
sissippi River.              1:100.          the channel at Waterproof cut-off,
                                              Mississippi River, miles 675 to 6811
                                              (in progress).
Leland Neck cut-off to     1, 1:1,000; d,   Channel stabilization study, Leland            Do.
Worthington Point,           1:100.          Neck cut-off to Worthington Point,
Mississippi River.                           Mississippi River, miles 486 to 5181
                                              (in progress).
Arkansas and White         1, 1:1,000; d,   To determine the effects on water              Do.
Rivers separation.           1:100.         surface elevations of separating the
                                              Arkansas and White Rivers, near
                                              their junction with the Mississippi
                                              (in progress).
Cut-off studies, Tar-      1, 1:2,400; d,   Study of the effects of cut-ofis at Tarp-      Do.
pley Neck to Vicks-          1:120.         ley Neck, Leland Neck, Worthington
burg, Mississippi                            Point, Willow Point, and Marshall
River.                                       Point, on water surface elevations,
                                              Mississippi River, miles 435 to 600 1
                                              (completed).
Natchez Levee set-back     1, 1:2,400; d,   Determine effects of a levee set-back          Do.
and channel enlarge-         1:120.         and channel enlargement opposite
ment,     Mississippi                        Natchez, Mississippi River, miles
River.                                      660 to 810; 1 Red River, miles 0 to 32;
                                              Atchafalaya River, miles 0 to 33
                                              (in progress).
Atchafalaya    enlarge-    1, 1:2,400; d,   Study to determine the effects on water        Do.
ment;     Mississippi,.      1:120.         surface elevations of enlarging the
Red, and Atchafa-                            channel of the Atchafalaya River,
laya Rivers.                                 Mississippi River, miles 660 to 810; 1
                                              Red River, miles 0 to 32; Atchafalaya
                                              River, miles 0 to 33 (in progress).
St. Clair River com-       1, 1:100; d,     To determine the type, number, and             Do.
  pensating weirs.           1:100 and       location of submerged sills needed
                             1:30.            to raise the level of Lake Huron. District engineer, De-
                                              St. Clair River from its origin to         troit (Great Lakes
                                              2,000 feet below the mouth of Black        division).
                                              River (completed).
Coney Island      Dike,    1, 1:250; d,     To determine means of improving navi- District engineer, Cin.
Ohio River.                 1:60.            gation and eliminating the backlash        cinnati (upper Mis-
                                              below Dam 36, Ohio River, miles 460        sissippi Valley divi.
                                              to 463 below Pittsburgh (in progress).     sion).
  1Distance in miles below Cairo.
                                  MISSISSIPPI        RIVER COMMISSION                                        1509

                               Scale of mod- Purpose of the experiment or scope of the        Performed for (Missis-
Name given to experi-          el: I=hors-    model (status of tests). All kinds of           sippi River Com-
       ments                    zontal, d=     mechanical analyses                             mission and outside
                                  vertical                                                      districts)-
                           I                    I                                        I-
Brazos-Santiago    Pass,            Determination of effects of jetties on
                               1, 1:300; d,                                                   Division engineer,
  Tex.                               present channel (experiment com-
                                 1:150.                                                        Gulf of Mexico divi-
                                     pleted).                                                  sion.
Winyah Bay, S. C..... 1, 1:500; d, Study of means of increasing navigable                     Division engineer,
                        1:100.       depths in the harbor (experiment                          South Atlantic divi-
                                     completed).                                               sion.
Articulated concrete Full scale; Sudy of the causes of leeching of subsoil                    District engineer,
mattress study.        small scale  from beneath concrete revetment (in                       Memphis.
                        models       progress).
                                  supple-
                                  menting.
St. Johns River, Fla....                    Study of means of preventing shoaling in
                               1, 1:1,000; d,                                                 District engineer, Jack-
                                  1:50.      navigation channel (in progress).                 sonville.
Freeport Canal Cross-          1, 1:200; d, Study of means of eliminating silting in          Division engineer,
  ing, Tex.                       1:45.      the intracoastal waterways canal at its           Gulf of Mexico divi-
                                             point of crossing the Brazos River di-            sion.
                                              version channel (in progress).
Aransas Pass, Tex ...- I 1, 1:500; d, Determination of means of increasing                        Do.
                                  1:100.     navigable depths in present jettied
                                              channel (in progress).
Tractive force--------......... Flume tests Determination of critical depths and              Mississippi River Com
                                  to full     slopes to cause movement of any given            mission.
                                  scale.      bed material. Correlation of rates of
                                              movement with tractive force values
                                              (in progress).
Directional energy.... .. Flume tests. Determination of natural lengths of tan-                   Do.
                                             gents and pools in Mississippi River,
                                             and relation between slope, length of
                                             river, and materials composing its bed
                                             and banks.

                                SOILS AND SEDIMENT INVESTIGATIONS


Bed-load investigations.                 Samples taken and analyzed from about                Mississippi River Com-
                                          800 points in the Mississippi River                  mission.
                                           and its tributaries, with a view to de-
                                           termining composition of bed materials
                                           and progressive variation of grain sizes
                                           (completed). Samples taken from
                                           Mississippi River and its upper tribu-
                                           taries, for the same purpose (in prog-
                                          ress).
Levee seepage--......... Levee 10 feet Locate hydraulic gradient in levees of                     Do.
                            high.         standard sections and of different ma-
                                          terials placed in various ways (tests
                                           complete; report being prepared).
Sediment investigation,                  Determination of quantity of sediment                District engineer, sec-
  Atchafalaya Basin.                      moving and distribution within the                   ond New Orleans
                                          section (completed).                                 district.
Levee subsidence----.......              Determination of subsidence of 2 sections            District engineer,
                                          of full scale levee, from analysis of un-            Vicksburg district.
                                          disturbed samples of foundation ma-
                                          terial (in progress).
Big Lake levee material.                 Study and comparison of present levee                District engineer,
                                          and new borrow-pit material to deter-                Memphis district.
                                          mine cause of numerous slides in former
                                          and suitability of latter as a levee ma-
                                          terial (completed).
Fort Peck Dam ma- __                ..._ Study to determine physical properties of            District engineer, Fort
  terial.                                 proposed core material for Fort Peck                 Peck, Mont.
                                           Dam (completed).
Montgomery cut-off_......_               Study to determine possible source of                District engineer,
                                          material deposited in cut-off between                Memphis district.
                                          White and Mississippi Rivers (com-
                                          pleted).


   Reports published to date include Sediment Investigations on the
Mississippi River and its Tributaries, prior to 1930 (out of print);
Experiment to Determine the Limit of Backwater Influence in the
Illinois River; Hydraulic Studies of Proposed Dam No. 37, Ohio
River; Experiments to Determine the Erosive Effects of Flood-
waters on Railroad Embankments; Experiment to Determine the
1510     REPORT OF CHIEF OF ENGINEERS,              U.   S.   ARMY,     1934

Effects of the Several Proposed Levee Extensions South of Eagle
Lake, Miss.; Sediment Investigations on the Mississippi River and
its Tributaries, 1930-31; Model Study of Effects of Dikes on the
River Bed at Walkers Bar, Ohio River; Experiment to Determine
the Effects of Proposed Dredged Cut-offs in the Mississippi River;
Model Study of Effects of Operating Birds Point-New Madrid
Floodway; Experiment to Determine the Effects of Mississippi River
Backwater on the Red River; Model Studies of Dike Location;
Investigation of Certain Proposed Methods of Bank and Embank-
ment Protection; Model Study of Shoaling below Starved Rock Lock
and Dam, Illinois River; Model Studies of Spillways for St. Lucie
Canal, Martin County, Fla.; Model Studies for Channel Stabiliza-
tion, Mississippi River.
   The waterways experiment station is operated under a revolving
fund which is reimbursed quarterly, thereby reducing costs incurred
thereunder by the office, president Mississippi River Commission, to
$0. Costs incurred for operation of the waterways experiment station
for the fiscal year 1934 amounted to $196,399.43, of which $191,277.67
was incurred from regular funds and $5,121.76 from N. R. A. funds.
The total cost incurred for construction and operation of the water-
ways experiment station to June 30, 1934, amounts to $709,652.83,
which is exclusive of $90,744.13 reimbursed for models, laboratory
tests, etc., furnished various Government offices. The regular over-
head cost of operation of the waterways experiment station is pro-
rated among the Memphis, Vicksburg, and second New Orleans
districts.
        TMMiARY
       SU          OF WORK     ACCOMPLISHED      WITH N.      R.   A.   FUNDS


   Memphis district.-A total of 16,520 linear feet of new revetment
and 793 linear feet of permeable pile dikes (the latter protecting
1,700 linear feet of bank) were constructed and placed for bank pro-
tection on Mississippi River; in addition, about 7,428,000 square feet
of mattress and 1,226 linear feet of permeable pile dikes were con-
structed and placed for repairs to or renewals of existing Mississippi
River bank protection works in the Memphis district; surveys were
made as necessary in connection with the existing and proposed
bank protection works. Work accomplished with N. R. A. funds in
connection with Mississippi River contraction works consisted in
placing 1,407 linear feet of permeable pile dikes (3 dikes, new work)
and placing 2,980 linear feet of permeable pile dikes in repairing or
renewing existing contraction works in the district; surveys were
made as required in connection with existing and proposed works.
A total of 25,490,623 cubic yards of earthwork was placed in levees
in the Memphis district with N. R. A. funds (25,465,258 cubic yards
under sec. 1 of May 15, 1928, Flood Control Act, and 25,365 cubic
yards under sec. 6 of the same act).
   Vicksburg district.-Practicallyall dredging work in the Missis-
sippi River during fiscal year 1934 in the Vicksburg district con-
  1The amounts shown are not additions to the detailed annual report, but are a part
of the amounts given therein.
                   MISSISSIPPI RIVER   COMMISSION                  1511
sisting of channel maintenance and stabilization and cut-offs, was
accomplished with N. R. A. funds, the total material moved involving
approximately 31,580,517 cubic yards. Work accomplished with
N. R. A. funds in connection with levee building in the Vicksburg
district involved the placing of approximately 4,990,247 cubic yards
of earthwork in levees along the Mississippi River and the Monroe
circle levee in the Boeuf Basin under section 1 of the May 15, 1928,
Flood Control Act. A total of 8,705 linear feet of new revetment
were constructed and placed for bank protection; in addition 48,486
square feet of mattress were constructed and placed for repairs to or
renewals of existing bank protection works, all on Mississippi River.
N. R. A. funds were also used in connection with surveys, gages,
and observations to supplement and complete the regular program
for fiscal year 1934, the regular funds being insufficient.
   Second district, New Orleans.Work accomplished with N. R. A.
funds consisted of channel stabilization by cut-offs and corrective
dredging on Mississippi River, and rectification and enlargement of
main and distributary channels and effluents of Atchafalaya River,
including the excavation of new channels, to improve the discharge
of flood waters; the total material moved with N. R. A. funds was
approximately 27,383,833 cubic yards. Maintenance of existing es-
sential bank protection where original work has become ineffective
through natural wear and tear, decay and corrosion, and extension of
revetment where controlling levee line is threatened by caving bank
or where set-back is impracticable or where revetment would be
lost by flanking; a total of 45,076 squares of mattress was constructed
and placed for repairs to or renewals of existing bank protection
work and 3,271 linear feet of new revetment were constructed and
placed. A total of 10,092,000 cubic yards of earthwork was placed
in levees on the Mississippi River and in the Atchafalaya Basin
under section 1 of the May 15, 1928, Flood Control Act as follows:
In the Atchafalaya Basin the work consisted in construction of the
levees to interim grade and cross section of the protection levees;
on the Mississippi River, enlargement to project grade and section
of substandard levees and set-backs where controlling line is threat-
ened by caving banks. N. R. A. funds were also used in beginning
work of clearing and cleaning out the Bonnet Carre floodway to
equalize distribution of flood waters.
   In the absence of H. B. Ferguson, Brigadier General, Corps of
Engineers, President of the Mississippi River Commission:
                                               D. McCOACH, Jr.,
                             Major, Corps of Engineers, Assistant.
  EXAMINATION   AND SURVEY REQUIRED BY THE ACT OF MARCH      3,   1921


   The commission was charged with the duty of making a prelim-
inary examination and survey provided for by the act of March 3,
1921 (Public, No. 372, 66th Cong., 3d sess.), of Atchafalaya, Black,
and Red Rivers in Louisiana for protection from flood waters of
Mississippi River. Report of the commission, dated July 1, 1926,
on the investigation was received. It is being held by the Board of
Engineers for Rivers and Harbors for the purpose of securing addi-
tional information and for further study.
1512   REPORT OF CHIEF OF ENGINEERS,      U.   S. ARMY,   1934


  PERMANENT   INTERNATIONAL ASSOCIATION    OF THE CONGRESSES     OF
                           NAVIGATION

   1. By an act approved June 28, 1902, Congress appropriated the
sum of $3,000 per year for the support and maintenance of the
Permanent International Commission of the Congresses of Naviga-
tion and for the payment of the actual expenses of the properly
accredited national delegates of the United States to the meetings
of the congresses and of the Commission. The object of the associa-
tion is the promotion of inland and maritime navigation by means of
organized congresses and the publication of pertinent information.
Its headquarters are in Brussels, Belgium, but the congresses. are
held in various countries upon invitation.
   2. The membership of the association comprises three general
classes-government, corporate, and individual. Governments are
represented by delegates, the number of delegates being based on the
amounts received annually from such governments and their na-
tionals for the expenses of the Commission. Corporate member-
ship may include the privilege of representation by delegate or not
according to the amount of the annual subscription paid by the
holder of each membership of this class. Life individual member-
ship may be secured upon the payment of a single fee, or ordinary
individual membership upon the payment annually of a fixed fee.
   3. The general affairs of the association are managed by a per-
manent Commission with the assistance of the permanent council.
The Commission is composed of delegates from the contributing
governments, and the council from the members of the permanent
Commission, the representation in each case being according to the
amount of the annual contribution.
   4. During the fiscal year the United States was represented as
follows: On the American section of the permanent Commission
by Col. Spencer Cosby, United States Army, retired, chairman;
Maj. Gordon R. Young, Corps of Engineers, United States Army;
Brig. Gen. Charles Keller, United States Army, retired; Mr. J.
Spencer Smith, president of the Board of Commerce and Navigation
of the State of New Jersey; Mr. Roy Miller, active vice president of
the Intracoastal Canal Association of Louisiana and Texas; Brig.
Gen. Herbert Deakyne, United States Army, retired; Col. Thomas H.
Jackson, Corps of Engineers, United States Army; Lt. Col. James
J. Loving, Corps of Engineers, United States Army, until October
9, 1933; and Col. W. J. Barden, Corps of Engineers, United States
Army, since that date. Colonel Loving served as Secretary of the
American section until he was relieved on October 9, and Colonel
Barden served after that date. On the American section of the
permanent council, by Colonel Cosby and General Keller.
    5. A meeting of the Commission was held in Brussels, Belgium,
on May 29, 1934, when the United States was represented by Maj.
John S. Bradgon and Capt. Lucius D. Clay, Corps of Engineers,
United States Army. The sixteenth congress will be held in Brus-
sels, Belgium, in September 1935. The matter of securing engi-
neers and specialists to prepare papers on the subjects to be con-
sidered at that congress has received attention, and it is expected
                   INTEROCEANIC    CANAL SURVEYS                 1513
that there will be papers by American writers on practically all
subjects before that congress.
   6. Copies of the report of the " Proceedings of the Fifteenth Con-
gress ", which was held in Venice, Italy, in 1931, were received from
the central office in Brussels and distributed to the American mem-
bers. Two semiannual bulletins, printed in English, and a list of
the topics to be considered at the coming congress were likewise
distributed.
   7. The expenditures during the year from the above appropria-
tion amounted to $1,820.32, of which $1,000 were for the support
and maintenance of the association, being the regular annual con-
tribution for that. purpose, and the balance was for the payment
of traveling expenses of delegates from the United States. The out-
standing obligations at the close of the year amounted to approxi-
mately $766.43 and were for the expense of delegates.
                    INTEROCEANIC CANAL    SURVEYS

    The proposed canal route across Nicaragua extends from Brito on
the Pacific via the Rio Grande, Lake Nicaragua, the Rio San Juan,
and the Rio Deseado to Greytown on the Atlantic, and is 173
miles long.
    A survey of the Nicaragua route was made in 1901, and Public
Resolution No. 99, Seventieth Congress, approved March 2, 1929,
authorized a further survey to bring the data up to date as well as
an investigation of additional facilities needed at the Panama Canal,
to be made under the direction of the Secretary of War and super-
vision of the Chief of Engineers, with the aid of such civilian
engineers as the President deemed advisable. The President ap-
pointed the Interoceanic Canal Board to assist the Chief of Engi-
neers. The Governor of the Panama Canal made the investigations
at Panama, and a provisional battalion of United States Engineer
troops made the survey in Nicaragua.
    The report of the Chief of Engineers, together with the reports
of the Interoceanic Canal Board, of the Governor of the Panama
Canal, and of the officer in charge of the survey, was submitted on
December 5, 1931, and published in House Document No. 139,
Seventy-second Congress, first session.
   An officer and one enlisted man are stationed in Nicaragua to
continue the collection and compilation of hydrological and meteoro-
logical data pertaining to the proposed canal.
   During the past fiscal year the collection of these data has in-
volved the operation on the watershed of 22 rainfall-recording sta-
tions, 7 for evaporation records, 4 for observing lake level and 2
each for recording temperature, humidity, and wind velocities, 1
for measuring the discharge of the San Juan River, and 1 for
measuring the discharge of the Rio Tipitapa, connecting Lake
Managua with Lake Nicaragua.
   The appropriation for the investigation and survey was $150,000,
of which $132,230 has been expended or obligated. The continuous
collection of hydrological and meteorological data pertinent to the
canal in Nicaragua is being paid for from the amount remaining
from the original appropriation.
1514     REPORT    OF CHIEF       OF ENGINEERS,          U.    S. ARMY,     1934


INVESTIGATIONS     AND   SUPERVISION      OF    PROJECTS            UNDER   THE    FEDERAL
                               WATER POWER ACT

  The Federal Water Power Act of June 10, 1920, created the Fed-
eral Power Commission and was modified by act of June 23, 1930,
entitled "An act to reorganize the Federal Power Commission."
  The law provides that no water-power license affecting the navi-
gable capacity of any navigable waters of the United States shall
be issued until the plans of the dam or other structures affecting
navigation have been approved by the Chief of Engineers and the
Secretary of War. There is further provision whereby any person
or corporation intending to construct project works in any stream
over which Congress has jurisdiction, other than navigable waters,
may file a declaration of intention for the purpose of ascertaining
whether or not the jurisdiction of the Federal Power Commission
will attach.
  To July 1, 1929, only work of an engineering nature had been re-
ferred to the War Department by the Commission.
  Since that date, in addition to the duties noted below, certain work
pertaining to accounting and related matters has been assigned to
the War Department, as indicated in the following table:
Number of projects on which supervision of all accounting work, includ-
  ing the supervision of preparation and the verification and certification
  to the Commission of statements of cost of original project and of all
  additions thereto and betterment thereof and of all annual operating
  and financial reports requested by the Commission has been assigned__                  3
Number of projects on which supervision of certain accounting and re-
  lated work during the construction period only has been assigned ...--                14
Special reports relating to accounting work requested__________________                  5
Special reports relating to accounting work rendered--------------------                 5
  To July 1, 1932, the following work of an engineering nature had
been referred to the War Department by the Commission:
                            -----
Engineering reports submitted                          ----------                      284
Public hearings held-----------------------------------------------          72
Licenses and permits referred for field supervision------------------       135
Licenses and permits referred for supervision of stream gaging------------    2
Declarations of intention referred for report_1---------------------------20
Reports submitted on declaration of intention ____________--------120
  During the past fiscal year work of an engineering nature has been
assigned and accomplished, as follows:
Engineering   reports requested          ------------------------                        4
Engineering reports submitted-__                                                         6
Public hearings held_____                                                                1------
Field investigations still in progress                                                   77-----
Licenses and permits under supervision -----------------                                59
Declarations of intention referred for report                                            1-----
Reports submitted on declaration of intention or applications considered
  as declarations            --------------------------------------------
Declarations of intention still under investigation0____________--------                 0
  The necessary expenses of transportation and subsistence of per-
sonnel engaged in investigations and the cost of supervision under
the provisions of the Federal Water Power Act are paid from appro-
priations made for the Federal Power Commission. All other costs
of administration of the laws in question are paid from funds avail-
able for maintenance and improvement of existing river and harbor
work.
                      MISCELLANEOUS       CIVIL WORKS                        1515
  During the fiscal year funds were allotted as follows for the inves-
tigation of water-power projects in cooperation with the Federal
Power Commission and the supervision of operations under water-
power permits and licenses:
From appropriations for the Conunission--_-------- ------------- $1,463. 04
From appropriations for works of river and harbor improvements___ 11, 059. 59
      Total                        ___         _
                                             _.__
                                             .__                           522. 63
                                                                      1.......________--_
                                                                      12,

   ABANDONMENT AND CURTAILMENT OF RIVER AND HARBOR PROJECTS


  By resolution of the Committee on Rivers and Harbors, House of
Representatives, dated April 18, 1930, a review of reports on Aban-
donment and Curtailment of River and Harbor Projects, printed in
House Document No. 467, Sixty-ninth Congress, first session, with a
view to determining whether any changes in the recommendation
made therein are advisable at the present time is requested. Infor-
mation in response to this resolution is being collected by the Board
of Engineers for Rivers and Harbors and report thereon will be
submitted as soon as practicable.
                MISCELLANEOUS CIVIL WORKS
  In addition to the work of improving rivers and harbors, civil
works of a miscellaneous character as listed below have been com-
mitted to the Corps of Engineers. Reports thereon are found at the
pages indicated.
Beach Erosion Board (p. 1527).
District of Columbia:
     Anacostia Park, reclamation and development (p. 1520).
     Water supply, maintenance of Washington Aqueduct (p. 1524) and construc-
       tion of work for increasing supply (p. 1527).
International-boundary waters (p. 1534).
Lake Memphremagog, International Board (p. 1534).
Lake of the Woods, regulation of level (p. 1536).
New York Harbor, supervision to prevent obstructive or injurious deposits
   (p. 1517).
Niagara Falls, preservation of (p. 1534).
Lake Superior Board of Control (p. 1535).
Rainy Lake Reference (p. 1540).
St. Croix River Board of Control (p. 1534).
St. Lawrence Board of Control (p. 1535).
Survey of northern and northwestern lakes including Great Lakes, Lake Cham-
  plain, Lake of the Woods, and other boundary and connecting waters between
  that lake and Lake Superior, and natural navigable waters of the New York
   State canals (p. 1528).
   Work accomplished..-The work of the fiscal year is summarized as
follows :
Anchorages established or modified, under the provisions of sec. 7 of the
  River and Harbor Act of Mar. 4, 1915        _--_----------------___-__
Bridge plans approved by the Chief of Engineers and the Secretary of
  War,, under the provisions of sec. 9 of the River and Harbor Act of
  Mar. 3, 1899, and the General Bridge Act of Mar. 23, 1906--------           198
Bridges, obstructive, alteration ordered by Secretary of War, under pro-
  visions of sec. 18 of the River aid Harbor Act of Mar. 3, 1899_  ------
Bridge rules and regulations, established or modified, under the pro-
  visions of sec. 5 of the River and Harbor Act of Ailg. 18, 1894 ._ -
Dams, other than water-power structures, plans approved by Chief of
  Engineers and the Secretary of War, tider the provisions of sec. 9 of
  the River and Harbor Act of Mar. 3, 1899       _                 __    _      3
1516     REPORT     OF CHIEF OF ENGINEERS,            U. S. ARMY,       1934

Harbor lines established or modified, under the provisions of sec. 11 of
   the River and Harbor Act of Mar. 3, 1899-----------------------           11
Navigation regulations established or modified, under the provisions of
   sec. 7 of the River and Harbor Act of Aug. 8, 1917________________-       10
Permits issued for work or structures in navigable waters, under the
   provisions of sec. 10 of the River and Harbor Act of Mar. 3, 1899
Sunken vessels investigated or removed, under the provisions of secs.
                                                                        -..-
                                                                         2, 505

   19 and 20 of the River and Harbor Act of Mar. 3, 1899_                   161
   Harbor of New York: Supervision maintained, 7 violations of law reported
for prosecution, 1 conviction obtained, and 13 prosecutions pending at end of
fiscal year.
   Anacostia Park: About 1 percent of the project executed during the fiscal
year; project about 80.2 percent completed.
   Washington Aqueduct: Water supply maintained without interruption; the
average daily per capita consumption was 176 gallons; the average total con-
sumption per 24 hours was 87,970,000 gallons, the maximum 112,950,000 gallons.
   Survey of northern and northwestern lakes: Revised editions of 28 charts
and 4 new charts were issued; about 18,177 charts were sold and 6,288 were
issued for official use; field work was in progress on Lake Michigan, Lake
Huron, Detroit River, Lake Ontario, St. Lawrence River, Lake Champlain, and
Rainy Lake.
   Preservation of Niagara Falls: The supervision of power companies was
continued.
  Appropriations.-The funds with which the miscellaneous civil
works were prosecuted during the year totaled $1,997,083.21, and
were derived as follows:
For investigations, inspections, hearings, reports, service of notice,
  or other action incidental to examination of plans or sites of
  bridges or other structures built or proposed to be built in or
  over navigable waters or examinations of alleged violations of
  laws for the protection and preservation of navigable waters of
  the United States or to the establishment or marking of harbor
  lines or establishment of anchorages : Allotted during year___ $125,           978. 02
     These funds were allotted from river and harbor appro-
  priations in accordance with the provisions of sec. 6 of the
  River and Harbor Act of Mar. 3, 1905.
For the investigation and removal of sunken vessels:
                                                    __
     Balance on hand July 1, 1933----------------------------              18,   776. 10
     Allotted during year-____------------------------_____                72,   463.94
     These funds were allotted from the permanent indefinite
  appropriation made for the purpose by sec. 20 of the River
  and Harbor Act of Mar. 3, 1899.
For other civil works:
     Balance on hand July 1, 1933-------------------------                756,   495. 09
     Allotted during year _-_--_------------------                     1, 000,   585. 86
     Received from sales and reimbursements during year       -------      22,   784. 20
     These funds were made available by special appropriations
   made by Congress in War Department, deficiency, District of
  Columbia, and by special acts.
       Total--------------------        ---------------------------- 1, 997, 083.21
  Expenditures.-The total expenditures for the fiscal year, exclusive
of outstanding liabilities, amounting to $316,953.72, were $1,192,-
488.19, expended as follows:
For investigations, inspections, hearings, and other action inci-
  dental to administration of Federal laws __________-___          $125, 978. 02
For the removal of sunken vessels____________-____----   ---          37, 181. 15
For other civil works__.      __-----____                         1, 029, 329. 02
       Total-----------------------------------------                   1, 192, 488. 19
Total funds available---            -                                   1, 997, 083. 21
             SUPERVISION     OF THE     HARBOR OF NEW         YORK           1517
Total expenditures---------------------------      $1, 192, 488. 19
Outstanding liabilities---------------------------     316, 953. 72
Revoked during year----------------------------         13, 358.45
Impounded savings during year-----------------          20, 184.30
                                                                      $1,542,984. 66

      Balance available June 30, 1934------------------------           454, 098. 55

             FUNDS NEEDED FOR MISCELLANEOUS           CIVIL WORKS


  The amounts which can be profitably expended during the fiscal
year ending June 30, 1936, as indicated in the respective reports, are
as follows:
Supervision of deposits, harbor of New York_-------------------  $190,          000
Survey of northern and northwestern lakes---------------------190,              000
Expenditures to be paid from Federal and District of Columbia
  funds; recommended in estimates submitted by the Commissioners
  of the District of Columbia:
    Washington Aqueduct, District of Columbia------------------490,             000
    Reclamation of Anacostia River Flats, D. C-------------    -  180,          000

      Total amount which can be profitably expended for miscel-
        laneous civil works under the direction of the Chief of
        Engineers _----------1----------------------------------- 1,050, 000

       SUPERVISION OF THE HARBOR OF NEW YORK
   Supervisor.-Capt. R. Drace White, United States Navy, July 1,
1933, to June 6, 1934; Capt. T. H. Taylor, United States Navy, since
that date.
   The laws enacted for the preservation of the tidal waters of New
York Harbor, its adjacent or tributary waters and the waters
of Long Island Sound are administered by the supervisor of New
York Harbor, a line officer of the Navy, under the direction of the
Secretary of War. The supervisor is charged under the laws with
the duties of preventing any obstructive or injurious deposits in the
waters under his jurisdiction and the prevention of any interference
with safe navigation of the channels of the harbor by deep-draft
vessels.
   The laws relating to the supervision of New York Harbor are acts
of Congress of June 29, 1888 (25 Stats. 209), amended by section 8
of act of May 28, 1908 (35 Stats. 424-426); act of Congress of
August 18, 1894 (28 Stats. 360); act of Congress of May 28, 1908
 (35 Stats. 426); act of Congress of February 16, 1909 (35 Stats.
623); act of Congress of June 7, 1924 (Oil Pollution Act, 1924).
   Operations and results during the fiscal year.-Notices to acquaint
navigation interests with the laws and regulations relating to the
harbor were issued with a view to obtaining cooperation in their
administration; dumping grounds for stone, ashes, street sweepings,
garbage, sewerage sludge, and other refuse were designated; and
4,343 permits were issued for the removal of approximately 24,490,857
cubic yards of material.
   Soundings were taken at frequent intervals over the designated
dumping areas to insure that sufficient depth of waters is maintained.
                                                                                                       '::
                                                                                       ,   .:
                                                                                                             ,....




                                                                                                f:1:
1518      REPORT OF CHIEF OF             ENGINEERS,            U. S.         ARMY,       1934


   Supervision was exercised by means of inspectors and patrols.
Three patrols are maintained-1 at the mouth of the harbor to col-
lect permits and observe conditions of loading; 1 to insure that no
material is deposited at places other than the designated dumping
grounds and to keep the main channels free of any interference to
the safe navigation of these channels by deep-draft vessels; and 1
along the water front to prevent the discharge into navigable waters
of waste oil and sludge, rubbish, and waste resulting from loading
operations. The amounts of material reported to have been removed
are constantly checked by the patrols.
                                     FLOATING PLANT

  In the interests of economy and to keep within the authorized
withdrawals allotted for this activity during the past fiscal year the
force of the large patrol boats was reduced by 1, and 1 unit, the
Cerberus, which had been in continuous service 28 years, was sold.
In order to keep up the necessary inspections, the operating time of
the remaining boats has been increased.
Actions to end of fiscal year 1934 for violations of act of June 29, 1888, and its
                                   amendments

Number of cases reported to United States attorneys for prosecution:
   Prior to fiscal year 1934 .------------------------------                                        - 802
   During fiscal year 1934-----------------------------      ---- -- -                                  7

       Total---              -----------------                                                       809

Number of convictions obtained or cases settled by compromise:
   Prior to fiscal year 1934_                                                                        6_____
                                                                                                     012
   During fiscal year 1934_ .-. ___________________-- -   -                              -      -      1

       Total-----------------             ---------------------------------                           13

Number of cases nolle prossed or discontinued:
   Prior to fiscal year 1934- ------------------------------                                         161
   During fiscal year 1934---------------------------------------                                      7

       Total------------------               ------------------------------                          168

Number of cases dismissed after trial:
   Prior to fiscal year 1934---
                             ........------------                                                     15
   During the fiscal year 1934---____-----                        --------------------                 0

       Total---------------------              ------------------------------                         15

Number of cases pending June 30, 1934------------------------                                         13

       Grand total-----------            ---------------------------------                           809
  The cost of operating the vessels and the work of the office for the
year was $160,559.04.
  Proposed operations.-(a) The unexpended balance plus accounts
receivable June 30, 1934, amounting to $181,315 for maintenance and
routine operations will be expended as follows:
                        SUPERVISION                   OF THE HARBOR OF NEW YORK                                          1519

Salaries and wages       -----------------------------------------                  $97, 000
Fuel (coal, oil, gasoline)-       --------------------                               23, 000
Subsistence of crews --------                 -----------------------------          13, 500
Docking and repairs          ---------------------------------------- 37, 500
Supplies, general                                                                     8,000
Office rent ---      ------                ---------------------------         ----   1, 000
Miscellaneous expenses -------------                      ------------------------- 1, 315

           Total--------                      --------              ----------------------------                      181, 315
   (b) The approximate date when it is estimated funds will be ex-
hausted is June 30, 1935.
   (c) The amount which can be profitably expended for the service
for the fiscal year ending June 30, 1936, is $190,000, distributed as
follows:
Salaries and wages      -----------------------------------------                        $97, 000
Fuel (coal, oil, gasoline) _------------_________-_                                       23, 000
Subsistence of crews _________-__--______                         __--______          -_  13, 500
Docking and repairs       ----------------------------------------                        42, 000
Supplies, general                                                                          9, 000
Wharfage and office rent---------                                            -----------   4, 000
Miscellaneous expenses ------------------                                                  1, 500
           Total-----                  ----         -----------------------------------                               190, 000

                                                  Cost and financial sumtmary
Cost of new work to June 30, 1934________----                                                                      ---
Cost of maintenance to June 30, 1934---------------------                                                    $4, 732, 217. 27
      Total cost of permanent work to June 30, 1934_.......                                                   4, 732, 217.27
Value of plant, materials, etc., on hand June 30,                                   1.934----------              393, 631. 44
      Net total cost to June 30, 1934___-------                                           -     -         5, 125, 848. 71
                                                                                                     -_______
Plus accounts receivable June 30, 1934---------                                                    _
                                                                                           -----------            765. 00
      Gross total costs to June 30, 1934------------------                                                    5,126, 613. 71
Minus accounts payable June 30, 1934------                                                                        3, 182. 49
     Net total expenditures ---------------
                                    __------            -                                                     5, 123, 431. 22
Unexpended balance June 30, 1934--------------------------                                                       180, 550. 72
            Total amount appropriated to June 30, 1934_......... __-                                          5, 303, 981. 94

     Fiscal year ending June 30                       1930            1931            1932            1933             1934

Cost of new work- . ...------ -------------
Cost of maintenance---------------------------
                                               -------------- ---------------------------------                          -------
Total expended--......-------------                $308, 964. 92   $204, 005. 36   $248, 503. 22   $323, 143. 45     $154, 102. 33
Allotted-------.............---- --------------     174, 360.00     193, 500. 00    137, 630. 00    251, 247. 18      330, 190. 21


Balance unexpended July 1, 1933-                                _-------------------------
                                                                     $4, 462. 84
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934__   __---------...   $162, 000. 00
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933---------------------    175, 000. 00
                                                                   337, 000. 00
      Amount to be accounted for---      ----------        ------                                                  341, 462. 84
Deductions on account of impounded savings revoked June 30, 1934                                                     6, 809. 79

            Net amount to be accounted for_                                    --------                            334, 653. 05
           !)1536-ENG 1934-                   96
1520     REPORT OF CHIEF OF ENGINEERS,              U.   S. ARMY,   1934

Gross amount expended------------------------__ $166, 510. 89
Less:
    Reimbursements collected----------$8, 840.00
    Receipts from sales_________________ 3, 568. 56
                                                    12, 408. 56
                                                                        $154, 102. 33
      Balance available June 30, 1934________________________            180, 550. 72
Outstanding liabilities June 30, 1934--------------------------3,             442. 59
      Balance available June 30, 1934___________---------         -      177, 108. 13
Accounts receivable June 30, 1934 --------------------------                  765. 00
      Unobligated balance available June 30, 1934 _______           _    177, 873. 13
Amount that can be profitably expended in fiscal year ending
  June 30, 1936: For maintenance 1__--__,______                          190, 000. 00

ANACOSTIA PARK AND THE RECLAMATION AND DE-
VELOPMENT OF ANACOSTIA RIVER AND FLATS
FROM THE MOUTH OF THE RIVER TO THE DISTRICT'
LINE, DISTRICT OF COLUMBIA

   District engineer: Maj. J. D. Arthur, Jr., Corps of Engineers, to
March 31, 1934; Capt. L. H. Hewitt, Corps of Engineers, to April
30, 1934; Lt. Col. John C. H. Lee, Corps of Engineers, since that
date.
   Division engineer: Col. T. H. Jackson, Corps of Engineers.
   Location.-The Anacostia River enters the Potomac River at
Washington, D. C.
   Previous projects.-Forthe part of the project below the Anacostia
Bridge, which is also a river and harbor improvement, see Annual
Report of the Chief of Engineers for 1919, page 553, under heading
" Existing project." For a description of the previous projects for
the improvement extending upstream from the Anacostia Bridge see
Annual Report of the Chief of Engineers for 1923, page 1990, under
heading " Existing project."
   Existing project.-This provides for the improvement of the river
and for the reclamation and development of the adjacent flats from
the mouth of the river upstream to the District of Columbia bound-
ary line, a distance of about 61/3 miles, to afford a river channel 15
feet deep in the section between Anacostia Bridge and Massachusetts
Avenue, 9 feet deep thence to Benning Road. The section from the
mouth upstream to the Anacostia Bridge was dredged to a depth of
20 feet under a river and harbor project. The dredged material is
to be used for fills.
   The project includes a constant-level lake or lateral basin on the
west side of the river, to be known as Lake Kingman, and a smaller
lake on the east side of the stream. The normal surface elevation of
thd lakes is to be 2 feet above mean low tide, and they are to be
dredged to a depth of 6 feet. A culvert or small bridge is to be con-
structed over Lake Kingman on the line of Benning Road, and a
lock and bridge is to be built at the lower end of Lake Kingman.
Influent and effluent gate-control works are to be provided to main-
tain a constant level in both lakes.
   Masonry sea walls on a riprap substructure are to be constructed
along the tidal channel of the river to extend 6 feet above mean low
1Exclusive of available funds.
                           ANACOSTIA   PARK                       1521
water; the walls of the lakes are to extend 3 feet above mean low
water or 1 foot above the level of the lake.
    A portion of the reclaimed tract is to be set aside for develop-
ment by the Agricultural Department for a national arboretum and
botanical garden. A strip of waterfront land on the right bank of
the river between the Anacostia Bridge and the Pennsylvania Rail-
road freight bridge is to be set aside for commercial purposes. The
bridges at Benning Road over the main channel are not to be altered.
The estimated cost of the project is $4,125,000 (October 1923). To
this must be added $150,000 appropriated by act approved July 3,
1930, for cost of land not covered in estimated cost of project because
of subsequent adverse court decision as to United States ownership.
    The acts of Congress authorizing and defining the present plan of
improvement are as follows:
    District of Columbia appropriation acts approved March 2, 1911
  (36 Stats. 1005); July 2, 1914 (38 Stats. 549); March 3, 1917 (39
Stats. 1040); March 3, 1915 (38 Stats. 923); August 31, 1918 (40
Stats. 950); July 11, 1919 (41 Stats. 99); June 5, 1920 (41 Stats.
954); February 28, 1923 (42 Stats. 1364); June 7, 1924 (43 Stats.
572) ; March 3, 1925 (43 Stats. 1246); May 10, 1926 (44 Stats. 448) ;
March 2, 1927 (44 Stats. 1328); February 25, 1929 (45 Stats. 1295);
July 3, 1930 (46 Stats. 986); February 23, 1931 (46 Stats. 1410);
and June 29, 1932 (47 Stats. 376).
    The latest published map is found in Annual Report of Chief
of Engineers, 1924, at page 1994.
    Local cooperation.-The funds for this project have been appropri-
ated by the District of Columbia appropriation bills, which, through
the fiscal year ended June 30, 1920, provided for half of the expense
to be borne by the District of Columbia. From that date to June
30, 1924, the expense was borne 60 percent by the District of Colum-
bia and 40 percent by the United States. Beginning July 1, 1924,
the District of Columbia paid all required above the lump sum
appropriated from United States revenues.
    Operations and results during fiscal year.-The U. S. hydraulic
pipe-line dredge Dalecarliawas engaged from July 10 to August 25,
1933, in dredging in section G, Anacostia River, depositing a total
of..56,807 cubic yards (credited and gross) on the adjacent flats.
The U. S. derrick boat Benning was engaged at intervals during the
year in banking back of seawall and reinforcing levees handling a
total of 9,239 cubic yards of material, of which 4,560 cubic yards
were credited to reclamation. A labor gang was engaged in rein-
forcing levees and miscellaneous work in connection with the dredg-
ing. The total cost of dredging and levee work was $9,935.84.
    A total of 100,806 cubic yards of select material was placed on
the dump fills at a cost of $1,390.18 for supervision.
    Construction of masonry seawall was in progress from September
20 to November 30, 1933. A total of 1,548 linear feet of wall was
completed at a cost of $19,674.70.
    Riprap stone was obtained from the demolition of the Aqueduct
Bridge across the Potomac River, a total of 3,500.29 tons being
deposited in trenches at various points and wingwalls were con-
structed at culvert in Lake Kingman at a cost of $5,168.99.
    Miscellaneous surveys, investigations, and supervision of Civil
Works Administration labor gangs were handled throughout the
year at a cost of $3,572.13.
1522          REPORT OF CHIEF                        OF ENGINEERS,                         U.     S.   ARMY,           1934


   The total cost of work for the year was $39,741.84, all applied to
new work. In addition $962.17 was charged during the year to the
cost of completed new work. The total expenditure was $44,895.74.
   Condition at end of fiscal year.-The table below indicates the
work accomplished and expenditures therefor on the project to
June 30, 1934. The project is 80.2 percent completed.
   The controlling depth below Anacostia Bridge in March 1933 was
21.5 feet, with a width of 300 feet; between Anacostia Bridge and
Pennsylvania Avenue Bridge in March 1933, it was 14 feet, with a
width of 400 feet; between Pennsylvania Avenue Bridge and Penn-
sylvania Railroad bridge in December 1929 it was 16 feet, with a
width of 400 feet; between the Pennsylvania Railroad bridge and
Benning Bridge in August 1932 it was 6 feet, with a width of 100
feet; between the Benning Bridge and the District line in May 1933
it was 5 feet, with a width of 100 feet; and in Lake Kingman the
controlling depth was 5 feet at mean low water.
                    Itetiz(d st te1teJ t of cot                       aofd wcok(Ifl
                                                                           Lo'I     to Junae 30, 1934


                                              Item                                                        Work accom-
                                                                                                           plished               Cost


Study and investigation           ----------------           ------                 --...-
                                                                               ----------                                       $31, 180. 23
Reclamation:
     (a) Dredging ...---...                    ---         ----.................       cubic yards-            11, 196, 145   1, 386, 810. 34
     (b) Dump fills--------           ------------------------------                     ---------------------                    39, 263. 35
Sea walls:
    (a) Channel-foundations --------------
                                  .                                 linear feet.
                                                                   J-------------------  38, 539                                516, 080. 43
    (b) Channel-masonry .---------------         ----.-----------------.do----           24, 424                                311, 511. 17
    (c) Lake and islands-foundations--------------------- --- do.                        27, 620                                325, 377. 12
    (d) Lake and islands-masonry -...........-----------------.-------      do----       16, 068                                100, 054. 82
Land....             ---..
                       ----
            ..----------    ----------------------------------------- acres--           391.651                                 456,860.88
Allen Bridge------------------------------------                ---------------------------                                      81, 503.91
Plant and repair yard.....---------         -----------------..------------------                      - ------------              (1)
Lock, bridge, and influents------------ --------                                   -             --   ------                     87, 370. 93
Effluent house and connecting cable----- --. ----------        --          --.-------------------     _______                    27,7C0. 78
Contingencies-------------------------           -------------------- -       ----------------- --------------                   62, 429. 20
Engineering and clerical expenses ..-----------------                          --              ---------       --                 (1)
Miscellaneous surveys ..-       -      --- -..--                 -                  .     .           -      ---                   228. 37
       Total cost------------------------------------------------                            ---------------------            3, 426, 431.53

  1 Cost under these items included in totals for the other items.
  2To be distributed to above items.

  Proposed operations.-The funds unexpended June 30, 1934, $91,-
239.57, will be applied as follows:
Accounts payable June 30, 1934                    -------------                                                               $1,375. 10
New work :
    Dredging operations, U. S. dredge Dalecarlia, sec-
      tion G    ------------------------------------                                                       $8, 400. 00
    Trenching and levee construction operations, U. S.
      derrick boat Benning, section G-----------------                                                       5, 000. 00
    Labor gang on levees, waste weirs, etc-                                                                  2, 000. 00
    Supervision of dump fills                          -----------------------                               2, 000. 00
    Sea-wall foundations, navigation channel, section G
      (July to October 1934)    ------------------------                                                     5, 000.00
    Sea wall, masonry, navigation channel, section G
      (April to June 1935) -------------------------                                                       25, 000. 00
    Purchase and condemnation of land----------_                                                           42, 000.00
    Miscellaneous surveys-------- -------------------                                                          464. 47
                                                                                                                              89, 864. 47
          Total-..         ___------------___                                                                       _-        91,239. 57
                                              ANACOSTIA- PARK                                                               1523
  It is expected the funds will be practically exhausted by June 30,
1935. It is proposed to do the above work with Government plant
and hired labor. The sum of $180,000 can be profitably expended
during the fiscal year 1936, as follows:
New work:
   Dredging° (July to October 1935) --- __      ---------           $24, 000
   Trenching and levee construction (July 1935 to June 1936)         10, 000                                  ---
   Labor gang on levees, etc. (July 1935 to June 1936)-------------   3, 000
   Supervision of dump fills (July 1935 to June 1936)----------       3, 000
   Sea wall foundations (,July to October 1935) -------------------- 30, 000
   Masonry sea wall (July to November 1935 and March to June
     1936) ------------------                                   ---  80. 000
   Effluent conduit (April to June 1936)----------------------       30, 000

        Total-----------------------------------------------------                                                       180, 000
  It is proposed to do the above work with Government plant and
hired labor, except that the riprap stone for sea-wall foundations
will be purchased under contract.
                                     Cost and financial sutnmary
Cost of new work to June 30, 1934___ ---- --------------- $3, 426, 431. 53
Cost of maintenance to June 30, 1934______________-------------------
      Total cost of permanent work to June 30, 1934----------3, 426. 431. 53
Value of plant, materials, etc., on hand June 30, 1934 --- __ .   6,594. 12

     Net total cost to June 30, 1934--------------------------                                                   3, 433, 025. 65
Plus accounts receivable June 30, 1934--                                                                        ------
     Gross total costs to June 30, 1934------------------                                                                   65
                                                                                                                 3,433, 02:5.
Minus accounts payable June 30, 1934_          ________--                                                 _            375. 10
                                                                                                                     1____
                                                                                                                   -1,

        Net total expenditures__                                  ---         -----                              3, 431, 650. 55
Unexpended balance June 30, 1934_________.____                                        _________--                   91, 239. 57

        Total amount appropriated to June 30, 1934_                                                              3, 522, 890. 12

   Fiscal year ending June 30                1930                 1931            1932                   1933             1934


Cost of new work__        -_     _    $178,496.58          $335, 664. 39      $223,799.10          $104, 544. 03         $39, 741. 84
Cost.of maintenance ---        ------- ---          -----------          --- -----------            ---       --------
      Total cost __.......--            178, 496. 58         335, 664. 39      223, 799. 10         104, 544. 03          39, 741. 84
Total expended    ---------- ----       210, 908. 40         329, 688. 88      226, 284. 20          95, 472. 40          44, 895. 74
Allotted------------------------      - 330, 000. 00         179, 520.00       179, 520. 00         -5, 171.10           -1,337. 27


Balance unexpended July 1, 1933--------------------------         $137, 472. 58
Deductions on account of impounded funds carried to surplus fund_    1, 337.27

      Net amount to be accounted for---------1------------------36, 135. 31
Gross amount expended ---------------------------- $45, 195. 74
Less reimbursements collected_ --                       300. 00
                                                                 44, 895. 74

      Balance unexpended June 30, 1934-                                         -             --                    91, 239. 57
Outstanding liabilities June 30, 1934_                                                                              43, 375. 10

     Balance available June 30, 1934___                                      ____________47, 864.47
Accounts receivable June 30, 1934___-

        Unobligated balance available June 30, 1934                                   -              -              47, 864.47
1524        REPORT OF CHIEF OF ENGINEERS,                             U.   S. ARMY,         1934

Amount (estimated) required         to be appropriated - for
                      - - - - - - - - - - - - - - - - - - - - -
                                                                       completion
                                                                - - - - - - - - - - -
of existing project 1                                                                $752, 109. 88

Amount that can be profitably expended in fiscal year ending June
30, 1936:               - - - - - - - --- - - - - - - - - - - - - - - - - - - - - - - - - - - - -
   For new work 1--                                                                                180, 000. 00.
   For maintenance -----------------                             --------------------------

         Total --------------                 -----------------------------                     180, 000. 00

MAINTENANCE AND REPAIR OF THE WASHINGTON
                AQUEDUCT
  District engineer: Maj. J. D. Arthur, Jr., Corps of Engineers, to,
March 31, 1934; Capt. L. H. Hewitt, Corps of Engineers, to April
30, 1934; Lt. Col. John C. H. Lee, Corps of Engineers, since that
date.
  Division engineer: Col. T. H. Jackson, Corps of Engineers.
  Description.-A description of the system and of previous projects;
for construction and maintenance is printed at pages 2206-2208, An-
nual Report of the Chief of Engineers for 1930.
   The control of the system was vested in the Chief of Engineers-
by the act of March 2, 1867, and section 1800, Revised Statutes.
   The total cost on the entire system to June 30, 1934, including
accrued liabilities, was $29,032,180.92, of which $21,791,431.14 was,
for construction, $6,998,976.14 was for maintenance and operation,
$223,621.81 was for springwater supply, and $18,151.83 for deferred
charges.
  Existing project.-The existing project provides for the care,
maintenance, and operation of the system up to the point where
the purified water is delivered to the District of Columbia distrib-
uting system, and also for the care and maintenance of the Conduit
Road, McMillan Park, and the meters on the various Government
services.
  Local cooperation.-Up to the end of June 30, 1916, the expenses
of the Washington Aqueduct were paid one-half by the District of
Columbia and one-half by the United States, since which time they
have been paid wholly out of the revenues of the water department
of the District of Columbia.
  Of the appropriations for increasing water supply, District of
Columbia, $25,000 has been appropriated wholly out of the revenues
of the United States, $3,200,000 out of revenues payable, 60 percent
by the District of Columbia and 40 percent by the United States,
and of the balance after June 30, 1924, the District of Columbia
paid all required above lump sum appropriated from United States
revenues.
   Operations and results during fiscal year.-The average turbidity
was reduced from 150 to 0.01 and the bacterial content from 2,638
to 4.8 per milliliter. The average daily consumption was 87,970,000
gallons, and the maximum was 112,950,000 gallons, making the aver-
age per capita consumption in the District of Columbia 176 gallons
per day. The average daily consumption of water in Government
  ' Exclusive of available funds.
                                        WASHINGTON                AQUEDUCT                         1525
buildings was 9,364,000 gallons, or approximately 10.6 percent of
the total. Over 23,000 tubes of water from various points in the
system were examined for bacterium colon, and after sterilization,
the average number of bacterium colon per 100 milliliters was found
to be 0.05,. Average alkalinity of the filtered water was 58; average
pH value was 7.7; and average hardness was 84. The cost of water
delivered to the water department for distribution to consumers was
$46.05 per million gallons, as compared with $47.17 in 1933.
  Under appropriations of $150,000, District of Columbia Act of
June 29, 1932, and $43,500, Emergency Appropriation Act, fiscal
year 1935, plans and specifications were prepared and contracts and
orders given for the construction and equipment of a booster pump-
ing plant to lower the water level at entrance into Dalecarlia Reser-
voir, and thereby increase the flow through the conduits from Great
Falls, Md., while raising the storage capacity of the reservoir
proper.
                                                    TOTAL COST


  The total cost under the appropriation for the fiscal year, includ-
ing accrued liabilities, was $401,195.97.
  The distribution of cost was as follows:

                                                                                                 Cost per
                                                                                 Total           million
                                                                                                  gallons


Collecting system-------------         ----------------------------------      $73, 836. 65            $2. 30
Purification system .---                                                            505. 16
                                                                                3------------.---------------------------
                                                                               231,                     7. 21
Distribution system__--------------------------------                           95, 854. 16             2. 98
       Total----------------------------------------------------------------   401,195.
                                                                                      97               12.49



                                           PROPOSED OPERATIONS

  (a) Funds appropriated for the fiscal year ending June 30, 1935,
by the District of Columbia Appropriation Act, approved June 4,
1934, will be used as follows:
   For operation, including salaries of all necessary employees, maintenance and
repair of Washington aqueducts and their accessories, including Dalecarlia,
Georgetown, McMillan Park, First and Second High Service Reservoirs, Wash-
ington Aqueduct Tunnel, the filtration plants, the pumping plants, and the
plant for the preliminary treatment of the water supply; ordinary repairs,
grading, opening ditches, and other maintenance of Conduit Road; purchase,
installation, and maintenance of water meters on Federal services; purchase,
care, repair, and operation of vehicles, including the purchase and exchange of
one passenger-carrying motor vehicle at a cost not to exceed $650; purchase
and repair of rubber boots and protective apparel, and for each and every pur-
pose connected therewith, $420,624.
   (b) The amounts which can be profitably expended during the
fiscal year ending June 30, 1936 (estimated), are as follows:
  For operation, including salaries of all necessary employees, maintenance, and
repair of Washington aqueducts and their accessories, including Dalecarlia,
Georgetown, McMillan Park, First and Second High Service Reservoirs, Wash-
ington Aqueduct Tunnel, the filtration plants, the pumping plants, and the
plant for the preliminary treatment of the water supply; ordinary repairs, grad-
1526           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                       19 34

ing, opening ditches, and other maintenance of Conduit Road; purchase, instal-
lation, and maintenance of water meters on Federal services; purchase, care,
repair, and operation of vehicles including the purchase and exchange of one
passenger-carrying motor vehicle at a cost not to exceed $650; purchase and
repair of rubber boots and protective apparel, and for each and every purpose
connected therewith, $490,000.
   Nothing herein shall be construed as affecting the superintendence and con-
trol of the Secretary of War over the Washington Aqueduct, its rights, appurte-
nances, and fixtures connected with the same, and over appropriations and
expenditures therefor as now provided by law.
                                 Financial summary as of June 30, 1931

                                                                                                Unexpended
           Washington water supply                                   Treasuryto
                                                     Appropriated I Reverted                    (less accruals      Cost to June
                                                                                                 and receiv-          30, 1934
                                                                                                    ables)


Total to June 30, 1933-_.----------   _-- $29, 099, 965. 73                  $405, 092. 87        $56, 424. 67      $28, 638, 448. 11
Acts of June 16, 1933, Mar. 28, 1934, and                                                                                               '
June 19, 1934-------------------------      1446, 183. 14                 -__             _        52, 450. 41         393, 732. 73

     Total         --------------------------
                          _                            29, 546, 148. 87          405, 092. 87     108, 875. 08       29, 032, 180. 92
Encumbered                                                            -             --        --------------             108, 875. 08

  1Includes an appropriation of $43,500 for booster pumping station and $2,683.14 to cover 5-percent pay
restoration.

                                              Division of expenditures

                                                                          Paid by-

                         Units                                                                                          Tota 1
                                                  United States           District of          Water depart-
                                                                          Columbia                ment

Total   construction____________ $10, 965, 377. 11                    $9, 090, 041.24          $1, 736, 012. 79     $21,791,431.14
Total   maintenance ...........    _       ._ 1, 222, 316. 72             955, 473. 18          4, 821, 186. 24       6, 998, 976. 14
Total   spring-water supply .............        223, 621.81                                                             223, 621. 81
Total   deferred charges ... _............                                                          18, 151. 83           18, 151. 83

        Total ........     _.___...........       12, 411, 315. 64    10, 045,514.
                                                                      10, 045, 514. 42
                                                                                    42          6, 575, 350. 86      29, 032, 180. 92



                   Washington Aqueduct, District of Columbia, mnaintenance
1932:
                                     --
    July 1, 1933, balance unexpended_____     ____----------                                                            $261.35
    June 30, 1934, amount expended during fiscal year                                                                       .57

           June 30, 1934, balance carried to surplus fund__----                                                           260. 78

1933:
    July 1, 1933, balance unexpended-------------------------                                                        48, 126. 00
    June 30, 1934, carried to surplus fund (impounded)                                                                    53. 05

                                                                                                                     48, 072. 95
        June 30, 1934, amount expended during fiscal year----------                                                  47, 992. 95

        June 30, 1934, balance unexpended_ _ _ ___ ____---------80.                                                           00
        June 30, 1934, outstanding liabilities__-----------------                                                 ------------

           June 30, 1934, unobligated balance available---------                                        ----                80. 00
                            WASHINGTON AQUEDUCT                                          1527
1934:
     Amount appropriated by act approved June 16, 1933-------- $400, 000. 00
    Amount appropriated by act approved Mar. 28, 1934_ --.-   -   2, 683. 14

                                                                                   402, 683. 14
    June 30, 1934, amount expended during fiscal year-----------                   382, 934. 43

      June 30, 1934, balance unexpended__          -                -                    748. 71
                                                                                  -9,1----------
    June 30, 1934, outstanding liabilities_        ______-- -------                  17, 225. 92
                                                                                     2, 522. 79
    June 30, 1934, amount covered by uncompleted contracts..__                       5,967.45

      June 30, 1934, balance available-____________--                              -3, 444. 66
    June 30, 1934, accounts receivable__---------                ----                 3, 995. 23

      June 30, 1934, unobligated balance      ----------------                          550. 57

             BOOSTER PUMPING   PLANT, DALECARLIA         RESERVOIR,     D.   C.
1934 :,
     July 1, 1933, balance unexpended ___________--_--_---                        $141, 510. 83
    Appropriated by act approved June 19, 1934___-----_                             43, 500. 00

                                                                                   185, 010. 83
    June 30, 1934, amount expended during fiscal year----------                     92, 241. 18
                                                -__
      June 30, 1934, balance unexpended______________                               92, 769. 65
    June 30, 1934, outstanding liabilities-________
                                           --------- -1,                                102. 26

                                                                                   91, 667. 39
    June 30, 1934, amount covered by uncompleted contracts____                     63, 159. 47

      June 30, 1934, unobligated balance available--------------                    28, 507. 92


               INCREASING   WATER   SUPPLY,   DISTRICT    OF COLUMBIA


Total amount appropriated to June 30, 1934__---------_                       $8, 725, 100. 00
Total amount expended to June 30, 1934-------------------                     8, 717, 961. 33

      July 1, 1933, balance unexpended_----------------------                       7, 000. 00
June 30, 1934, amount expended during fiscal year (refundment)_                        138. 67

     June 30, 1934, balance unexpended .__-___- ___________                         7, 138. 67
June 30, 1934, outstanding liabilities-______________--_____                        7, 000. 00

      June 30, 1934. unobligated balance available__._________                          138. 67

                     BEACH EROSION BOARD
  The Beach Erosion Board was established and its duties defined by
section 2 of the River and Harbor Act of July 3, 1930 (Pub. No.
520, 71st Cong.), which authorized and directed the Chief of En-
gineers, under the direction of the Secretary of War, to cause in-
vestigations and studies to be made in cooperation with appropriate
State agencies of the various States on the Atlantic, Pacific, and
Gulf coasts and on the Great Lakes and the territories, with a view
to devising effective means of preventing erosion of the shores of
coastal and lake waters by waves and currents. The act also pro-
vides for the release to the appropriate State agencies of the infor-
mation obtained from these studies and for the payment of the costs
of the investigations.
          1528         REPORT OF CHIEF OF ENGINEERS,                                                   U. S. ARMY,             1934

            Under the terms of the act the board is to consist of 4 officers of
          the Corps of Engineers and 3 civilians, selected by the Chief of
          Engineers with regard to their special fitness, from among the State
          agencies cooperating with the War Department.
             The members of the board are: Col. W. J. Barden, Corps of
          Engineers; Col. Earl I. Brown, Corps of Engineers; Col. E. J. Dent,
          Corps of Engineers; Maj. G. R. Young, Corps of Engineers; Richard
          K. Hale, associate commissioner, Department of Public Works, Bos-
          ton, Mass.; Victor Gelineau, chief engineer, Board of Commerce and
          Navigation, State of New Jersey; Thorndike Saville, consulting en-
          gineer, Department of Conservation and Development, State of
          North Carolina.
            All requests for cooperative investigations with appropriate State
          agencies have been referred to the board for consideration and recom-
          mendation. In addition, a number of questions concerning shore
          protection of Federal property or arising in connection with river
          and harbor projects, have been referred to that portion of the board
          composed of officers of the Corps of Engineers, which has been
          designated as the Shore Protection Board.
            The work accomplished by the board, since its organization, and
          the status of its operation at the close of the fiscal year, are shown
          by the following table:

                                                                                                       Ordered    With-        Com-     Remain-
                                 Character of investigation                                             or re-    drawn        pleted         in-
                                                                                                       quested                            ing


          Cooperative studies------------------                      -       ---------------....   .        14             2        4          8
          Federal studies----            ---------------------------------------...                .        26   .---------        23          3
          Experimental studies-----------------------------------------                                      8 ---------            3          5
                        ---------------------------------------------
                Total...........                                                                            48             2       30         16



            Cost and financial summnary.-Expenses incident to the operations
          of the board are paid from funds appropriated for examinations,
          surveys, and contingencies for rivers and harbors.
          Total amounts allotted to the board since organization-----------$60,874. 82
          Net expenses of the board since organization__________________     58, 760.92
                Balance unexpended, June 30, 1934_____________________                                                               2, 113.90
          Net expenses of the board for fiscal year 1934___________________                                                         13, 388. 38

          SURVEY OF NORTHERN AND NORTHWESTERN LAKES
                      [Conducted by the U. S. Lake Survey Office, Detroit, Mich.]

             District engineer: Col. F. A. Pope, Corps of Engineers.
             Surveys-Great Lakes.-The existing general project, stated in
          detail in the Annual Report for 1907, pages 844 to 850, comprises
          the following work: Ascertainment and charting of depths in all
          significant regions of the Great Lakes to a plane 30 feet below the
          adopted low-water datum of the open lakes, and 25 feet below the
          corresponding datum in the channels of the connecting river; com-
          pletion of triangulation and precise leveling needed to control the
          areas under survey; river-discharge measurements; investigations

   !
riiiiii
               NORTHERN    AND NORTHWESTERN        LAKES          1529
of lake levels; magnetic surveys in and near main vessel courses; and
prompt examination of areas where obstructions to navigation have
been reported.
    Surveys-Newl York State canals.-The Sundry Civil Act of
March 4, 1911, provided that the survey be extended to include the
lakes and other natural navigable waters of the New York State
,canals. The project contemplated revision and adjustment by field
reconnaissance of all existing survey data pertaining thereto, sup-
plemented by such additional topographic and hydrographic surveys
as might be required for the publication of navigation charts of
these waters. Field work under this project has been completed,
and the full set of charts has been published.
    Surveys-Lake Champlain. The scope of operations was ex-
tended by the Sundry Civil Act of June 23, 1913, to include Lake
Champlain. Surveys of harbors and other important areas were
commenced during the field season of 1928. This work was com-
pleted in 1933.
    Surveys-Bundary wyaters between the Lake of the Woods and
Lake Superior.-The Sundry Civil Act of August 1, 1914, extended
the work of the Lake Survey to include these waters. The project
provides for the preparation of navigation charts of the American
waters of the Lake of the Woods and Rainy Lake, complete with
hydrography, and for the preparation of charts of the remainder of
the boundary waters without hydrographic detail, it being consid-
ered that existing commerce does not warrant the preparation of
complete navigation charts except for the two lakes named.
    Charts.-The chart project, adopted April 17, 1909, provided
for revising old charts and preparing new ones. Further details
concerning it and a detailed statement of the work required to com-
plete it are printed on pages 1918-1923 of the Annual Report of the
Chief of Engineers for 1917.
   The number now in force, including 4 charts of the Lake of the
Woods, 5 charts of Lake Champlain, 7 charts of the New York
State canals, and 108 charts of the Great Lakes, is 124. The number
of charts necessary is not fixed. Changing requirements of naviga-
tion may render new charts desirable or make old charts unnecessary.
   Bulletins.-The work pertaining to the Bulletin of the Survey of
Northern and Northwestern Lakes consists in publishing annually
in April a revised volume of coast and harbor descriptions, etc., and
seven monthly supplements from May to November giving changes
and additions.
   Investigation of lake levels.-The present general project is the
continuation and extension of that published in the Annual Report
for 1898, pages 3774-3776.
   Estimated cost of the work.-The cost of additional new work re-
quired to complete the survey of Rainy Lake in accordance with the
existing project is estimated at $37,000. The cost of maintenance
work, which includes revision and reissue of charts, revisory sur-
veys of harbors, and miscellaneous investigations of obstructions to
navigation, observation and study of lake levels, publication of bul-
letins, supplements, and notices to mariners, and other continuing
necessary activities, is estimated at $170,000 for the fiscal year 1935.
1530   REPORT OF CHIEF OF ENGINEERS,         U. S.   ARMY,     1934

            OPERATIONS   AND   RESULTS   DURING   THE   YEAR

   Surveys.--Four parties were at work in the field on July 1, 1933,
and operations were continued until November 16. Four parties
were organized in the spring of 1934. Work was begun May 9, and
was continued to the end of the fiscal year. Localities and char-
acter of the work are as follows:
   Lake Michigan: Chicago, sweeping obstructions in harbor; vicinity
of Beaver Islands, Charlevoix, Harbor Springs, Petoskey, and
Manistee, revisory surveys; Frankfort, Ludington, Pentwater, Mus-
kegon, Grand Haven, Holland, South Haven, Saugatuck, St. Joseph
and Michigan City, reconnaissance surveys.
   Lake Huron: Tawas, Alpena, Rockport, and Cheboygan, revisory
surveys.
   Detroit River: From Wyandotte to Lake Erie, revisory surveys.
   Lake Ontario: Oswego, revisory survey.
    St. Lawrence River: Cape Vincent to Ogdensburg, sweeping in
navigation channel; Ogdensburg, Alexandria Bay, revisory surveys.
Cape Vincent to St. Regis, recovery of control points.
   Lake Champlain: Revisory surveys were completed on July 12,
1933.
   Rainy Lake: Control, topography, sounding and sweeping west
of a line from the east side of Cranberry Bay northeast to the
middle of the entrance to Seine Bay. Control and sounding through
Brule Narrows, along north shore of Saginaw Bay and the north
shore of the Third Traverse to Paternoster Island.
    Charts.-Duringthe year ended June 30, 1934, revised editions of
28 charts and 4 new charts were prepared and issued. Revision of
negatives for printing on offset press is well advanced. Three
revised editions and one new chart have been printed on offset press.
    The number of charts sold during the year by the Detroit office
was 15,719 and by the Buffalo, New York City, and Albany offices,
2,458, the aggregate sales being 18,177. The proceeds of sales,
amounting to $6,820.20, were deposited to the credit of the Treasurer
of the United States. The Detroit office issued 5,807 charts for
official use, and the Buffalo, New York City, and Albany offices 481,
°a total of 6,288.
   Bulletin, etc.-The present edition of the bulletin is 2,200 copies.
Supplements Nos. 3 to 7, Bulletin No. 42, were issued between July
and November 1933.
    Copy for Bulletin No. 43 was prepared during the winter and
forwarded to the Public Printer in February. The edition was
received, June 22. Supplements Nos. 1 and 2 were printed locally
under contract and were issued in June 1934.
    In addition to the publications mentioned above, mimeographed
notices of monthly stages of the Lakes were sent to newspapers,
vessel interests, and Government officials in the Lakes region.
   Investigation of Lake levels.-Fourteen self-registering gages and
two staff gages were operated throughout the year at the regular
stations on the Lakes and connecting rivers. Four self-registering
gages on the Detroit River, one at Monroe on Lake Erie, and one
at Alpena on Lake Huron, were operated except during the winter
season. Permanent installations were made at Oswego and Ogdens-
                 OPERATIONS                    AND RESULTS                       DURING THE YEAR                                                1531
burg and gages were installed there in May 1934. Temporary staff
gages were installed at Sandusky and Erie on Lake Erie in May
1934.
   Between July 14 and September 29 measurements were made
of the flow through the several channels in the lower Detroit River
under the abnormal conditions caused by the cofferdams. Changing
hydraulic conditions in that river have been followed carefully.
A study of the hydraulic conditions in the St. Clair River from 1860
to 1932 was completed.
   The total cost for new work during the year was $18,328.24 and for
maintenance $161,993.07, aggregating $180,321.31. The total ex-
penditures during the year, after deducting receipts from sales, were
$185,639.37.
   Condition at end of fiseal year.-The present project for surveys
on the Great Lakes as formulated in 1907 and the project work on
New York State canals and on Lake Champlain have been com-
pleted. The field work on Lake of the Woods and adjacent waters.
including Rainy Lake, is about 90 percent completed.
   Charts.-On June 30, 1934, there were in force 124 charts, compris-
ing 108 of the Great Lakes, 5 of Lake Champlain, 7 of New York
State canals, and 4 of Lake of the Woods. These charts are on sale
at the Lake Survey office at Detroit, at the canal office at Sault Stye.
Marie, Mich., and at the United States Engineer offices in Buffalo,
Albany, and New York City. Complete sample sets are on file at
the United States Engineer offices at Duluth, Milwaukee, Chicago,
and Cleveland, affording additional facilities for examination and
selection before placing orders.
   From 1882 to June 30, 1934, a total sum of $150,944.69 was derived
from the sale of charts and deposited in the United States Treasury.
In all, 939,998 of these charts have been sold and issued for actual
service.
   The bulletins, which contain descriptions of coast lines, harbors,
channels, menaces to navigation, and other important information
supplementary to the charts, but of too voluminous a character to be
incorporated thereon, are issued free in connection with the charts.
They are distributed annually according to a carefully revised mail-
ing list, and a stock of the current bulletin and the supplements
theretois kept on hand for issue to chart purchasers.
Monthly means of water levels for stations named, ewpressed in feet above
                             mean sea level
                                               [Adjusted levels of 1903]


                                               1933                                                                  1934
     Station

                     July      Aug.     Sept.       Oct.      Nov.        Dec.        Jan.        Feb.        Mar.          Apr.        May       June

Marquette_.-:        602.78    692. 86 '602.   84   602.   851602.   79   602.   58   602.   41   602.   23   602.   11     602.   16   602.   511602. 77
Milwaukee-.....      578.78    578. 56 578.    26   577.   90 577.   69   577.   58   577.   52   577.   52   577.   50     577.   72   577.   95 578. 07
Harbor Beach..,      578. 68   578.53 578.     14   577.   89 577.   69   577.   53   577.   45   577.   43   577.   39     577.   58   577.   79 577. 87
Cleveland     . -_   571. 77   571. 48 571.    03   570.   59 570.   17   570.   12   569.   95   569.   62   569.   59     570.   14   570.   37 570. 40
Oswego....           245. 17 244. 77 244. 36243.85 243. 44 243. 37 243. 59243.68 243.68 244.27 244.48 244. 36
1532     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                        1934

   Costs and expenditures under existing project.-It is impracticable
to determine separately the costs for new work and for maintenance
since the adoption of the existing project. The approximate com-
bined cost found by deducting expenditures of $3,973,897.31 under
previous projects from the total cost of permanent work is $3,505,-
021.66. The total expenditures under the existing project up to June
30, 1934, amount to $3,634,731.10.
   Proposed operations.-It is proposed to apply the balance of funds
unexpended on June 30, 1934, as follows:
Accounts payable June 30, 1934    ------------------------------               $3, 038. 67
New work :
    Hydrographic survey of Rainy Lake:
        Operation of launch under lease------------$2, 500. 00
        Expenses of survey party, field and office---- 17, 500. 00
                                                                               20, 000. 00
Maintenance:
   Maintenance of gages at regular stations on Great Lakes,
      including reduction of records--------------------------                     9,000. 00
   Hydraulic surveys, including discharge measurements in outflow
      rivers : Field and office expenses                                            , 000. 00:
                                                                                   6------------------------
   Revisory surveys, including harbor surveys and investigations
      of shoals and menaces :
        Operation of steamer and launches _---------- $41, 000. 00
        Expenses of survey parties, field and office--- - 28, 000. 00
                                                                               69,000. 00
    Recovery and remarking of control points: Expenses of survey
      party, field and office__----------------------------------               3, 000.00
    Chart preparation, correction, issue, and sale------- --------             80, 00. 00
    Preparation of bulletin, preparation and publication of supple-
      ments ------------     ----------------------------------                    3, 000. 00
    Balance remaining ___________________________7,                                   930. 48

       Total      --------------------------------------------                200, 969. 15
  The cost of operations will average about $18,500 per month
prior to December 1 and after May 1, while parties are in the field,
and about $12,100 per month during the remainder of the year. It is
expected that available funds will be exhausted by June 30, 1935.
  For utilizing existing organization and plant to the best advan-
tage, work estimated to cost $190,000 can be profitably carried on
during the fiscal year ending June 30, 1936, as follows:
New work :
   Hydrographic survey of Rainy Lake:
      Operation of launch under lease------------------                  $2, 000
      Expjenses of survey party, field and office-----------             15, 000
                                                                                    $17, 000
Maintenance:
   Maintenance of gages -------------------------------------                          9, 000
   Hydraulic surveys, including discharge measurements in outflow
      rivers :
         Operation of Government launch-----------------       $1,500
         Expenses of party, field and office------------------  8, 500
                                                                                     10, 000
    Revisory surveys:
        Operation of steamer and launches---------------$40, 000
        Expenses of survey parties, field and office---------26, 000
                                                                                     66,000
    Recovery and remarking of control points---------------------                     5,000
    Chart preparation, correction, issue, and sales----------------                  80, 000
    Preparation of bulletin, preparation and publication of supple-
      ments      -----------------                ...--       ---                      3, 000
         Total-          -           -        -           -      -   -    -         190, 000
                     OPERATIONS AND RESULTS DURING THE YEAR                                                          1533
                                              Cost and financial summary
Total cost of permanent work to June 30, 1934_...-...........                                           $7, 478, 918. 97
Value of plant, materials, etc., on hand June 30, 1934  ___                           ------                132, 594. 81

      Net total cost to June 30, 1934 _----------____---                                                7, 611, 513. 78
Plus accounts receivable June 30, 1934 ----   --------------                                                    138. 96
      Gross total costs to June 30, 1934____           -     -                                           7, 611, 652. 74
Minus accounts payable June 30, 1934-------------------------                                                 3, 038. 67

     Net total expenditures-----------------------------7,                                                    608, 614. 07
Unexpended balance June 30, 1934__---------------------                                                       200, 969. 15

           Total amount appropriated to June 30, 1934- ------------                                      7, 809, 583. 22

    Fiscal year ending June 30                   1930           1931           1932              1933               1934


                    --
Cost of new work .......-----  ______          $71, 319. 98   $47, 652. 98   $31, 568. 71      $25, 945. 20       $18, 328. 24
Cost of maintenance---------..........---.      81, 958. 40   121, 767. 87   160, 166. 32      159, 336. 87       161, 993. 07
       Total cost_---------------              153, 278. 38   169, 420. 85   191, 735. 03      185, 282. 07        180, 321.31
Total expended----------------200, 716. 42                    192, 402. 64   195, 526. 65      168, 712. 92        185, 639. 37
Allotted--...............------------------    217, 000. 00   197, 300. 00    18, 250. 00      370, 000. 00        204, 000. 00



Balance unexpended July 1, 1933-__-----------------            -__ $192, 584. 65
Amount allotted from War Department Appropriation
  Act approved Apr. 26, 1934 .- ________....._      $175, 000. 00
Credit from transfer to U. S. Coast and Geodetic
  Survey----------------------------------------           14.34
Amount allotted from War Department Appropriation
  Act approved Mar. 4, 1933---------------------      29, 000. 00
                                                                    204, 014. 34
      Amount to be accounted for_---------------------__                                                      396, 598. 99
Deductions on account of impounded balances revoked----------                                                    , 990. 47
      Net amount to be accounted for-----------------------                                                   386, 608. 52
Gross amount expended ____________--     ___--     $189, 072. 49
Less reimbursements collected--------- -    --- __  -3, 433. 12
                                                                                                              185, 639. 37
      Balance unexpended June 30, 1934---------------------     200, 969. 15
Outstanding liabilities June 30, 1934 ____.___ -__  $2, 938. 69
Amount covered by uncompleted contracts -----------  1, 250.25
                                                                  4, 188. 94
     Balance available June 30, 1934____ . __--     __.______-                                                196, 780. 21
Accounts receivable June 30, 1934__________     ____--138.                                                              96
      Unobligated balance available June 30, 1934__. ___________                                              196, 919. 17
Amount (estimated) required to be appropriated for completion of
existing project 1_________________________________       _-                                                  17, 000. 00
Amount that can be profitably expended in fiscal year ending
June 30, 1936:
       For new work                                                                                            1-----------------
                                                                                                               17,  000. 00
                              -      -
       For maintenance 1____________________ __ __                                -
                                                                                            _____173,               000. 00

           Total 1-----------------                                                                           1901, 000. 00

   1 Exclusive of available funds.
 1534   REPORT OF CHIEF OF ENGINEERS,       U.   S.   ARMY,   1934

           INTERNATIONAL BOUNDARY WATERS
OPERATIONS OF THE INTERNATIONAL    ST. CROIX RIVER BOARD     OF CONTROL


   Constitution and duties.-The Board was organized in pursuance
to conditions in the orders of the International Joint Commission
approving the maintenance and operation of the dam built by the
St. Croix Water Power Co. and the Sprague Falls Manufacturing
Co., Ltd., across the St. Croix River at Grand Falls in the State of
Maine, and subsequent agreements reached between the two
Governments.
   The Board is charged with the duty of formulating and adminis-
tering rules under which the power plant and accessories are to be
operated to prevent as nearly as possible a level of water at the
dam higher than 203.5 (mean sea-level datum), and to secure to the
users of water below Grand Falls the flow of water to which they
are entitled. The Board is also charged with the supervision of the
operation of all fishways on that portion of the St. Croix River that
forms the international boundary.
   The members of the Board are Mr. J. T. Johnston for Canada and
Lt. Col. John J. Kingman, Corps of Engineers, who relieved Lt. Col.
Richard Park on February 9, 1934, for the United States.
   Operations during the fiscal year.-Supervision was maintained
and inspections made to insure that the regulations of the Interna-
tional Joint Commission were being carried out.
                        LAKE MEMPHREMIAGOG

    Lake Memphremagog, lying in northern Vermont and southeast-
ern Quebec, has as its outlet Magog River in Canada. In 1920 a peti-
tion filed by the city of Newport and the towns of Derby, Coventry,
and Barton, all in Vermont, alleged that they had been injured by
the raising of the lake level through the construction and operation
of power plants on the Magog River. Upon the suggestion of the
Dominion of Canada an international board composed of an engineer
of each of the respective Governments was appointed to consider the
matter and submit a joint report to each Government as to the level
or levels at which Lake Memphremagog should, so far as possible,
be maintained.
   At the request of local interests consideration of the problem was
suspended until 1931, when a survey was made and maps prepared.
A report prepared by the American member was considered by the
Board in conference and by correspondence, and as a result a joint
report by the two members of the Board was submitted to their
respective Governments under date of May 14, 1934.
   Mr. J. T. Johnston, director of the Dominion Water Power &
Hydrometric Bureau, served as Canadian member of the Board, and
Lt. Col. Richard Park, Corps of Engineers, as United States
member.
                  PRESERVATION   OF NIAGARA FALLS


   District engineer: Lt. Col. Max C. Tyler, Corps of Engineers, to
October 27, 1933, and First Lt. T. H. Stanley, Corps of Engineers,
since that date.
                INTERNATIONAL   BOUNDARY    WATERS             1535
   Division engineer: Col. E. M. Markham, Corps of Engineers, to
October 25, 1933, and Lt. Col. Max C. Tyler, Corps of Engineers,
since that date.
   In 1923 a board known as the " Niagara Control Board " was con-
stituted by the United States and Canada to measure and supervise
the diversion of water from the Niagara River on both sides of the
international boundary line. The members of the Board during the
fiscal year were Mr. J. T. Johnston and Dr. Charles Camsell for
Canada, and Lt. Col. Max C. Tyler and Dr. J. Horace McFarland for
the United States.
   Description.-The history in brief of operations in behalf of the
preservation of the scenic grandeur of the Falls and the rapids of
Niagara River may be found by reference to the following sources:
   Annual reports of the Chief of Engineers and appendixes thereto.-
Pages 1703 to 1705, report for 1915; pages 2067-2069, report for
1920; and pages 2104-2105, report for 1921; Report on Diversion of
Water from the Great Lakes and Niagara River, the War Depart-
ment, June 1921; Senate Document No. 128, Seventy-first Congress,
second session, containing report by the Niagara Control Board; and
a Supplemental Report on the Fall of Rock, which was submitted
on November 10, 1931.
   Operations during the fiscal year.-Records of water levels above
the Falls were obtained by means of four self-registering gages.
Records obtained from the Niagara Falls Power Co. furnished water
elevations in the gorge of Niagara River at station no. 3A. The
Niagara Control Board received a complete hourly record of the di-
version at all power. plants.
OPERATIONS OF THE BOARD OF CONTROL TO CONTROL THE OPERATION OF THE
  ST. LAWRENCE RIVER POWER CO.'S WORKS IN THE ST. LAWRENCE RIVER
  NEAR MASSENA, N. Y.
  An order of the International Joint Commission issued after a
hearing on the application of the St. Lawrence River Power Co.
for permission to continue to maintain the submerged rock weir
constructed by the company in the south Sault Channel of the St.
Lawrence River, authorized the maintenance of the weir and, among
other things, provided for a board of engineers to pass upon and
control the new and old works involved.
  The members of the Board during the fiscal year were Mr. J. T.
Johnston for Canada, and Lt. Col. Max C. Tyler, Corps of Engineers,
for the United States.
  Operations during the fiscal year.-The Board kept in touch with
conditions by means of inspections and with respect to the diversion
by means of monthly reports of the power company, showing the
amount of water diverted and power-house performance from day
to day.
                 LAKE SUPERIOR BOARD OF CONTROL

  The Board is charged with the supervision of the operations of all
compensating works and all power canals and accessories with a view
to maintaining the level of Lake Superior between elevations of
602.1 and 603.6 above mean tide at New York.
     91536-ENG 1934--97
1536   REPORT OF CHIEF OF ENGINEERS,        U.   S. ARMY,   1934

  The members of the Board for the fiscal year 1934 were Mr. J. T.
Johnston for Canada, and Maj. R. C. Crawford, Corps of Engineers,
for the United States.
  Operations during the fiscal year.-The Board kept in touch dur-
ing the year with conditions obtaining to the diversion, through
representatives of the United States and Canada on the ground, and
by means of regular and systematic reports of the water levels in
Lake Superior and in the channels above and below the Sault Locks
and in Lake Huron. Records of discharge through the rapids, navi-
gation canals, and power plants at the Sault were also systematically
reported to the Board.

                      LAKE OF THE WOODS, MINN.

   Location and description.-The Lake of the Woods is an irregu-
larly shaped body of water 1,485 square miles in area, lying partly
in northwestern Minnesota and partly in eastern Manitoba and
western Ontario, Canada. The southerly portion of the lake is an
expanse of relatively shallow open water about 30 miles wide, bor-
dered on the United States side in Minnesota by low and generally
swampy shores.
   Original condition.-The lake remained in its natural condition
until 1888, when the construction of the Rollerway Dam at one of
its outlets near Kenora, Ontario, had the effect of raising the natural
level of the lake an average of about 3 feet, which amount was
reduced to about 1.5 feet between 1893 and 1898. Under the author-
ity of the government of Ontario, the Norman Dam was built in
the Winnepeg River, about 1 mile below the Rollerway Dam, be-
tween- 1893 and 1895. It was placed in operation in 1898 and has
had the effect of raising the natural high-water level of the lake an
average of about 21/4 feet during the years from 1898 to date.
   Existing project.-The convention between the United States and
Great Britain proclaimed July 17, 1925, provides for the regulation
of the level of the Lake of the Woods in order to secure to the
inhabitants of the United States and Canada the most advantageous
use of the waters thereof and of the waters flowing into and from
the lake on each side of the boundary between the two countries.
   The convention also provides for the establishment and main-
tenance of a Canadian Lake of the Woods Control Board to regulate
and control the outflow of the waters of the lake, and for the estab-
lishment and maintenance of an International Lake of the Woods
Control Board, composed of two engineers, one representing the
United States and the other representing Canada, to whose approval
the rate of total discharge shall be subject whenever the elevation
rises above elevation 1,061 or falls below elevation 1,056 sea-level
datum.
   The members of the international board during the fiscal year were
Lt. Col. A. K. B. Lyman, Corps of Engineers, for the United States,
and Mr. J. T. Johnston for the Dominion of Canada.
   Detailed operations prescribed by the convention and by an act
of Congress approved May 22, 1926, as amended by an act approved
April 18, 1928, are:
                  INTERNATIONAL       BOUNDARY WATERS                     1537
   (a) For the regulation of the lake in accordance with articles 1, 4 and 5 of
the treaty when the level is outside the limits specified above.
   (b) For the acquisition by purchase or condemnation of flowage easements
up to elevation 1,064, sea-level datum, upon all lands in the United States bor-
dering on the Lake of the Woods, on the Warroad River, and on Rainy River,
all in the State of Minnesota.
   (c) For various protective works and measures as specified in article 8 of
the convention.
   (d) For investigation and report on all claims for damages caused to the
inhabitants of the United States by fluctuation of the levels of the Lake of the
Woods due to artificial obstructions in the outlets of said lake prior to the
acquisition of flowage easements.
   Oplerations and results during fiscal year.-The work performed
included procurement of flowage easements and the control of lake
levels.
   Negotiations in condemnation proceedings for the procurement of
flowage easements were continued. Preparatory to trial in court,
surveys were made of such tracts as have been noticed for trial.
During the fiscal year payment was made in 74 cases, and 4 addi-
tional cases were transmitted to the Department of Justice for pro-
curement of the necessary authority for final payment. Of the
above 74 cases, 1 was paid subsequent to the decision of the Circuit
Court of Appeals, which affirmed the ruling of the lower court in
the matter of law relating to the measure of damages to township
roads.
   The United States Supreme Court rendered its decision on April
30, 1934, affirming the opinion of the lower court and denying the
respondents' right to introduce in evidence testimony on reservoir
adaptability values, in four cases tried in 1931. Trial of a case
involving a group of roads in Laona and Moranville Townships was
commenced on June 20, 1934, and concluded on July 2, 1934.
   Of the numerous appeals from the commissioners' awards filed
with the court, 97 were taken under the act of February 28, 1931,
which had the effect of reopening all default appeals whereon the
casement had been previously imposed by court decree. Subsequent
to the filing of these default appeals the court, by order dated Sep-
tember 14, 1933, dismissed a total of 45 such appeals on the ground
that no authority had been shown for their taking. Of the cases
appealed under the act of February 28, 1931, which have been per-
mitted to stand in the court record, six cases were disposed of by
trial during the fiscal year 1934 and payment of supplemental judg-
ments pursuant thereto was made September 9, 1933. Also nine such
cases have been disposed of by stipulations for settlement, and sup-
plemental judgments pertaining thereto have been paid.
   All easements yet to be obtained, 503 in number, are in process of
condemnation in the Federal courts.
   The total number of past damage claims is 495. All reports on
these were submitted to the Chief of Engineers in 1931, thus com-
pleting that work.
   Lake levels were controlled in cooperation with the other mem-
bers of the International Lake of the Woods Control Board con-
stituted for the purpose. Contact was maintained with Canadian
officials, data gathered, and studies made for further action to be
taken when required.
   The costs of the work of the year were $8,330.48 for surveys and
investigation of easements, and $82,900.04 for the purchase of ease-
1538      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                     1934

ments, totaling $91,230.52. There were no expenditures during the
year on past damage-claim work.
  Condition at end of fiscal year.--All surveys and mapping, except
such as may be required in connection with condemnation cases ap-
pealed for trial in court, have been completed. Protective works
have been constructed.
                  Status of the procurement of flowage easements
1. Cases disposed of:
      Purchased by the War Department----------------------------
      Easements acquired through condemnation proceedings ---------       304
      Tracts above easement limit included in condemnation proceedings
        but subsequently dismissed--------------------------------          7
      United States lands included in condemnation proceedings but subse-
        quently dismissed____________________-______                       13
      Dismissed from proceedings because of reversion of title to United
         States by cancelation of homestead entry                           1----------------
                                                                                    332

2. Cases to be dismissed from condemnation proceedings:
      United States lands mistakenly included in proceedings                          1------------
      Tracts formerly held by homestead entrants, but title to which has
        since reverted to United States by reason of homestead-entry can-
        celations-------       -------------------------------------                 33
                                                                                     34

3. Cases in various stages of completion yet to be disposed of through con-
         demnation:
      Commissioner's awards reported, notice thereof served, and appeals
         therefrom filed __----------------------------------------- 441

        Cases tried in Federal court and appeals from verdicts taken:
            Appealed by United States --------------       ----
            Appealed by land owners----------_________-__________                    12
                                                                                     12

        Cases previously disposed of but permitted to be brought back into
         the proceedings by appeals filed under the Amendatory Act of
         Feb. 28, 1931, under court ruling of Apr. 29, 1933---__________             46
        Cases ready for payment subject to approval of Department of
         Justice :
              Settlement reached by agreement _ ------------------------
                                                                                    503

                  Total easements in proceedings----_-__       -     -___           8_______
                                                                                    869
   The costs to the end of the fiscal year 1934 in connection with pro-
tective works and measures and the procurement of flowage ease-
ments are as follows:
Protective works and measures---___-_________              _______       $157, 122. 59
                  -- _
Flowage easements__        ----------------------                         352, 658. 61
     Total --------------------------------------------                     509, 781. 20
The total expenditures were------__--------------_         _       __       514, 302. 51
                                       INTERNATIONAL BOUNDARY                                                WATERS                                         1539
PROTECTIVE                  WORKS               AND MEASURES,                            LAKE           OF THE WOODS                           AND RAINY
                                                         RIVER, MINN.,                        1928-34


                                                      Cost and financial summary

Cost of new work to June 30, 1934__      -----                                                                                                   $234, 781. 20
Cost of maintenance to June 30; 1934--_...----.------                                                                          -              -----------
      Total cost of permanent work to June 30, 1934_...........    234, 781. 20
Value of plant, materials, etc., on hand June 30, 1934------------   4, 905. 52

       Net total cost to June 30, 1934..-------------------------                                                                                     239, 686.72
Plus accounts receivable June 30, 1934 --.----     ---------                                                                                              333. 25

     Gross total costs to June 30, 1934____________________                                                                                            240, 019. 97
Minus accounts payable June 30, 1934_ _--__-______-____-                                                                                              -     717. 46

      Net total expenditures ------------------                                                                                                       239, 302. 51
Unexpended balance June 30, 1934 ___ ----                                                                            -____ ___
                                                                                                                            --                        134, 245. 19

            Total amount appropriated to June 30, 1934_...                                                         ______-__                          373, 547. 70

            Fiscal year ending June 30                                        1930               1931                1932                  1933             1934


Cost of new work-------------------------                               $98, 562. 61          $32, 138. 33       $43, 335. 86           $18, 693.12       $42, 031. 28
Cost of maintenance....--------------------------
        Total cost..........................----------------------..       98, 562. 61        32,138. 33         '43, 335. 86            18, 693. 12       42, 031. 28
Total expended----------------------------                                 82, 482. 69        41, 632. 59         43, 878. 48            18, 590. 70       46, 718. 05
Allotted.        -------                   -----------------------------------------                                                -1, 080.85              -371.45



Balance unexpended July 1, 1933___                               $181, 334. 69
Deductions on account of revocation of allotment----------------       371. 45

      Net amount to be accounted for
Gross amount expended_________________________$47, 989. 46
                                                                                         ____________________180, 963. 24
Less reimbursements collected--------------------- 1, 271. 41
                                                                                                                                                       46, 718. 05

      Balance unexpended June 30, 1934--------------------- 134, 245. 19
Outstanding liabilities June 30, 1934_______- -     -_____ -___ 134, 578. 44

     Balance available June 30, 1934________________________                                                                                            -333.25
Accounts receivable June 30, 1934---------------------------_                                                                                             333. 25

PROTECTIVE WORKS AND MEASURES, LAKE OF THE WOODS AND RAINY RIVER,
                                                      MINN.            (WAR DEPARTMENT)

                                                      Cost and finanoial summary

Cost of new work to June 30, 1934 ....- ________________--_--____ $275, 000
Total amount appropriated to June 30, 1934_------------------------ 275, 000

           Fiscal year ending June 30                                        1930                1931               1932                   1933             1934


Cost of new work------
                .....--...........--------------                       $97, 303. 19        $22,884.18         $17, 359. 01           $11, 785. 75         $49, 199. 24
Cost of maintenance-...------------------------------------------------------------
        Total cost......................----------------------.            97, 303. 19        22, 884. 18         17, 359. 01           11, 785. 75        49, 199. 24
Total expended------------.....................-------                     96, 860. 31        22, 238. 57         15, 575. 28           11, 526. 02        43, 994. 46
A llotted....                              .      .      .     .       .     .      .     .      .      .    .      .      .        .      .      .       . .      .
1540    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1934

Balance unexpended July 1, 1933 _---------                             $43, 994. 46
Amount to be accounted for_ ----------         ------       _     __    43, 994. 46

Gross amount expended--__--------------                          43, 994. 46
Balance available June 30, 1934----------------------------------      0. 00

                           RAINY LAKE REFERENCE

  Location and description.-The Rainy Lake watershed, in Minne-
sota and Ontario, contains an area of approximately 14,500 square
miles. A description of this watershed is contained in the report
of the consulting engineers to the International Joint Commission
on Lake of the Woods Levels, 1916.
  Previous projects.-None.
  EXisting project.-This project includes the engineering studies
and field operations connected with the following questions referred
to the International Joint Commission by the Governments of the
United States and Great Britain pursuant to article 9 of the treaty
concluded on the 11th day of January 1909. The reference was
made as a result of an agreement entered into on the 24th day of
February 1925, at the time of signing the convention between the
United iStates and Great Britain to regulate the level of the Lake
of the Woods.
   Question 1. In order to secure the most advantageous use of the waters of
Rainy Lake and of the boundary waters flowing into and from Rainy Lake
for domestic and sanitary purposes, for navigation purposes, for fishing pur-
poses, and for power, irrigation, and reclamation purposes; and in order to
secure the most advantageous use of the shores and harbors of both Rainy
Lake and the boundary waters flowing into and from the lake, is it, from an
economic standpoint, now practicable and desirable, having regard for all or
any of the interests affected thereby, or under what conditions will it become
thus practicable and desirable--
   (a) To regulate the level of Rainy Lake in such a manner as to permit the
upper limit of the ordinary range of the levels to exceed elevation 1,108.61 sea-
level datum?
   (b) To regulate the level of Namakan Lake and the waters controlled by
the -dams at Kettle Falls in such a manner as to permit the upper limit of
the ordinary range of the level to exceed elevation 1,120.11 sea-level datum?
   (c) To provide storage facilities upon all or any of the boundary waters
above Namakan Lake?
   Question 2. If it be found practicable and desirable thus (1) to regulate the
level of Rainy Lake and/or (2) to regulate the level of Namakan Lake and
the waters controlled by the dams at Kettle Falls, and/or (3) to provide
storage facilities upon all or any of the boundary waters above Namakan
Lake---
   (a) What elevations are recommended?
   (b) To what extent will it be necessary to acquire lands and to construct
works in order to provide for such elevations and/or storage, and what will
be their respective costs?
   (c) What interests on each side of the boundary would be benefited? What
would be the nature and extent of such benefit in each case? How s lould
the cost be apportioned among the various interests so benefited?
   Question 3. What methods of control and operation would be feasible and
advisable in order to regulate the volume, use, and outflow of the waters in
each case in accordance with such recommendations as may be made in
answer to questions 1 and 2?
   Question 4. What interests on each side of the boundary are benefited by
the present storage on Rainy Lake and on the waters controlled by the dam
at Kettle Falls? What are the nature and extent of such benefits in each
case? What is the cost of such storage, and how should such cost be appor-
tioned among the various interests so benefited?
                        INTERNATIONAL                  BOUNDARY WATERS                                     1541
  Mr. Stuart S. Scovil was appointed as the Canadian engineer and
the district engineer at Duluth, Minn., was appointed as the United
States engineer to make the engineering studies necessary to enable
the International Joint Commission to answer the foregoing questions.
   Operations and results during the fiscal year.-The field work
of surveys has been completed and the report submitted by the
United States engineer has been completed and accepted by the
International Joint Commission.
                                 Cost and financial summary

Cost of new work to June 30, 1934 ________________________--                                         $115, 982.70
Total amount appropriated to June 30, 1934__...   ____---   __                                        115, 982. 70

        Fiscal year ending June 30               1930             1931          1932          1933         1934


Cost of new work.-----------------------      $15, 944. 60        $-9. 26 ------------------------            $9. 04
Total expended--------------------------       15, 116. 38         874. 36    ------------------------            9. 04
Allotted---------------------------   -----      ----...   .---    -9. 26          ..------                       9. 04



                                 ----------
Balance unexpended July 1, 1933_____                       __-----$0.                                           00
Amount allotted from third Deficiency Act, approved May 29, 1933                                             9. 04
Gross amount expended--------------------------------------------                                            9. 04
Balance unexpended June 30, 1934------------------                                                           0. 00
                                                                             E. M.     MARKHAM,
                                              Major General, Chief of Engineers.
                                     FINDING LIST
SHOWING THE SUBDIVISIONS                        OF THIS REPORT BY DISTRICTS

                                                                                               Page
River and Harbor Board__________ __--                         ______-________27
Boston, Mass-------------------------------------------------                                     30
Providence, R. I------------------------------------------------58
New York City, first district               --------------------------------                     101
New York City, second district ___----.--------------------                                      189
Philadelphia, Pa----------------------------------------------                                   219
Baltimore, Md               ------------------------------------------------                     273
Washington, D. C                  -------------------------------                                294
Norfolk, Va_--------------------------------------------------313
Wilmington, N. C-----              -----                              --------------------      353
Charleston, S.C ---------------------------------------                                         403
Savannah, Ga---------------------------------------                                    -----    428
Jacksonville, Fla----            ----------------------------------------                       455
Mobile, Ala ----------------------------------                                                  530
New Orleans, La., first district --------------------------------                               592
Galveston, Tex------------------------------------------------649
Vicksburg, Miss                                                                                   23
                                                                                                 7-------------------
Memphis, Tenn--------                -- --------------------------------------                   751
St. Louis, Mo------------------------------------------------                                   770
Mississippi River between the Missouri River and Minneapolis, Minn____                           782
Rock Island, Ill----------                  -------------------------------------                805
St. Paul, Minn                                                                                  8-------------------
Kansas City, Mo----------------------------------------------                                    822
Omaha, Nebr------------------- -----                                                             822
Fort Peck, Mont----------------------------------------------                                    822
Chicago, Ill      --------------------------------------------------                            850
Nashville, Ten-----------                    ------------------------------------                891
Ohio River, locks and dams and open-channel work--__--------__                                  914
Pittsburgh, Pa        -----------------------------------------------                             35
Zanesville, Ohio----------------                      ---------                                  955
Huntington, W. Va---------                     ---------- ------------------------              962
Cincinnati, Ohio---------------------------------------------------                              977
Louisville, Ky        ------------------------------------------------                           982
Duluth, Minn                ------------------------------------------------                    993
Milwaukee, Wis                 ----------------------------------------------                  1026
Detroit, Mich-----------------                         ------------------------------          1106
Buffalo, N. Y         -----------------------------------------------                          1157
Los Angeles, Calif            -------------------------------------------                      1237
San F'rancisco, Calif___________________                        _____-                         1252
Sacramento, Calif                                                                              1275
Portland, -Oreg         ----------------------------------------------                         1296
Seattle, Wash             -----------------------------------------------                      1355
Honolulu, Hawaii--                 ---------------------------------------                     1400
Puerto Rico-----------------------1-----------                                          -      1415
Surveys for navigation, flood control, power, and irrigation___________                        1424
California Debris Commission------------------------------                                     1429
Mississippi River Commission ----                   _______-_____________________              1445
                                                                                  1543
                                       INDEX


                                             A
                                                                                 Page
Abandonment and curtailment of river and harbor projects, review of
  reports-------------------------------------------------                       1515
Abbapoola Creek, S. C., examination and survey -------------------                428
Absecon Creek, N. J., improvement--------------------------------270
Absecon Inlet, N. J., improvement---------                                        272
Academy Creek, Brunswick Harbor, Ga., improvement______-------                    444
Acushnet River, New Bedford Harbor, Mass, improvement------------                  64
Advanced funds for river and harbor improvement.                               -- 99_____----__
Agate Bay Harbor, Minn., improvement_____________-__________                      996
Alabama River, Ala., improvement-___ _________-___-__-_________                   557
Alabama, State of, removal of water hyacinths from ______________588, 645
Alafia River, Fla., review of reports------------------------------ 529
Alamitos Bay, Calif., examination and survey_______________ ____-1252
Albany Harbor, Calif., examination and survey                                    1--------------------
Albemarle and Chesapeake Canal, N. C. and Va., improvement---------- 334
Albemarle Sound, N. C., improvement of waterway to Norfolk, Va., via
  Pasquotank River---                 -- -------------------------------------    331
Alexandria, Va., improvement of Potomac River at ________________--297
Algoma Harbor, Wis., improvement ____________________                      __    1047
Allegheny River, Pa.:
    Construction of locks and dams_0_______________________--__                   944
    Examinations and surveys-----------------------------------954
     Improvement by open-channel work---------------                                -   941
     Operating and care of locks and dams__________________________                  948
     Review of reports          ------------------------------------------ 954
Alligator Creek, S. C., improvement of waterway from McClellanville to
  Charleston     -------------------------------------------------                   410
Alligator River, N. C., improvement of waterway via river_____________               334
Alloway Creek, N. J., improvement___-------------------------------272
Alpena Harbor, Mich., improvement__ ------------------------------                  1137
Altamaha River and Sound, Ga.:
     Examination and survey of river------------------------------454
     Improvement of river                   __          ---------------------------
                                                         _         __                441
Alto Lake, Fla., review of reports on waterway via------------------- 530
Ambrose Channel, New York Harbor, N. Y., improvement----------                       128
Amherstburg Channel, Detroit River, Mich., improvement-------------1129
Amite River, La.:
    Examination       ---------------------------------------------- 649
     Improvement-       ----                                                            648
Anacortes Harbor, Wash., improvement----------------                               1398
Anacostia Park                                                                     1--------------------
Anacostia River, D. C.:
     Improvement_-----------------                     --       --                  312
    Reclamation and development of the flats---------------------1520
    Review of reports        -----------------------------------------              312
Anahuac Channel, Tex., improvement                  __________________________      687
Anchorage grounds, rules for establishment of----------------------1515
Anclote River, Fla.:
     Improvement     ---------------------------------------------                  522
    Review of reports      ------------------------------------------               529
Annapolis Harbor, Md., review of reports_________________________                   294
Apalachicola Bay, Harbor, and River, Fla.:
    Examination and survey of waterway to New Orleans, La----------- 592
    Improvement of channel to St. Andrews Bay __________-_______                    539
    Improvement of harbor in bay_______________________________                     533
    Improvement of river, including the Cut-off, Lee Slough, and lower
      Chipola River__________
                         -------------------------------------------                535
                                                                              1545
1546                                          INDEX

                                                                                                Page
Apopka Lake, Fla., waterway via, review of reports___---------------                             530
Appomattox River, Va., improvement--      -------------                                          328
Appoquinimink River, Del., improvement_     ___ ___-    -________ __-                            272
Appropriations:
   Allotments under War Department Appropriation Act of Feb. 23, 1931_                             15
   Allotments under War Department Appropriation Act of July 14, 1932_                             15
   Allotments under Emergency Relief and Construction Act of July 21,
        1932--                                                 --                                  17
    Allotments under War Department Appropriation Act of Mar. 4, 1933_                              18
    Allotments and transfers under War Department Appropriation Act
      of Apr. 26, 1934              ------------------------------------                            22
    Miscellaneous civil works -----------------------------------                                1516
    Permanent appropriations---------                                                                8
    Rivers and harbors-----------------------------------------                                      8
Aqueduct, Washington,   D.   C.,  maintenance         and     repair      of---------------       1524
Aquia Creek, Va., improvement______-----------------                                               312
Aransas Bay and Pass, Tex.:
    Improvement at Harbor Island --                    -___-------------------703
    Improvement of channel to Corpus Christi (via Turtle Cove)--------                             700
    Review of reports ------------------------------------------                                   721
Arcata Channel, review of reports on Humboldt Bay and Harbor, Calif_.                            1275
Arecibo Harbor, P. R., examination and survey-                        _________----------1424
Arkansas River, Ark. and Okla.:
    Examinations and surveys_-----------------------------------                                   770
    Improvement------            -------------------------------------                             751
Arroyo Colorado, Tex., examination and survey ---------------------                              -722
Arthur Kill, N. Y. and N. J.:
    Improvement___-------           -------------------------------------- 193
    Improvement of channel to Raritan River ____ __________________                                198
Arthur Lake, Mermentau River, La., improvement __________---                   --             __   637
Ashepoo River, S. C., improvement of waterway via___ __- _______--                    -     -      425
Ashland Harbor, Wis., improvement -----                   -----------------------                1006
Ashley River, S. C., improvement_            ---------------------------                           421
Ashtabula Harbor, Ohio, improvement ---------------------------                                  1183
Association of Congresses of Navigation, permanent international-------- 1512
Atchafalaya River, La.:
    Improvement--        -------------          ------------------------------                     648
    Removing snags and wrecks ___-- -----------------------                                        778
    Survey by the Mississippi River Commission ____-----------                           -       1511
Atlantic tidewaters to Great Lakes deeper waterways, review of reports__ 1237
Augusta, Ga.:
    Examination and survey of Savannah River at_------                            ---------        454
    Improvement of Savannah River below ----------------                                           433
Aux Bees Seies Lake, Frankfort Harbor, Mich., improvement -----------                             1100

                                                  B
Back Bay of Biloxi, Miss., improvement of Biloxi Harbor -__________ _        586
Back Cove, Portland Harbor, Maine, improvement ----------------------         31
Back Creek, Va., channel connecting with York River, review of reports__     312
Back River, Ga., improvement of waterway via _____________          ________ 438
Back River, Md., examination and survey ---------------------------          294
Back (Weymouth River), Mass., improvement________----------------             57
Baffins Bay, Tex., examination and survey--------------------------721
Bakers Bay, Columbia River, Wash., examination _______-----1351
Baltimore, Md.:
     Engineering district -------------------------                        --------              273
    Harbor and channels:
        Improvement      -------------------------------------------                             274
        Review of reports---------------------------------------                                 294
Barataria Bay and Bayou, La., improvement                                                         09
                                                                                                 6_______--------
Bar Harbor, Maine, improvement --------          ------------                                     57
Barnegat Inlet, N. J., review of reports--   --------------------                                273
Barren Islands Gaps, Md., review of reports ----------------------                                294
Barren River, Ky.:
    Improvement _-------------------           ---------------                                    982
    Operating and care of locks and dams -----------------------                                  989
                                             INDEX                                          1547
Bartholomew Bayou, La., and Ark.:                                                           Page
     Improvement             -------------------------    __       ------------------        750
    Improvement of Louisiana-Texas intracoastal waterway------------                         620
Bastrop Bayou, Tex., improvement -------------                                               720
Baton Rouge to New Orleans, La., improvement of Mississippi River
  between----       --------------------------------------------                              602
Battery, The, New York Harbor, N. Y., removal of shoal in Hudson River
  off Pier A     -------------------                                                          157
Baudette Harbor and River, Minn., improvement------------                                   1024
Bayboro Harbor, Fla., improvement_-----                                                       518
Bay Ridge Channel, New York Harbor, N. Y., improvement ____------134
Bay River, N. C., improvement-___ ____-__-__________                                _-        402
Bayside Channel, New York Harbor, N. Y., improvement--------------- 128
Beach Erosion Board__________                     -----------------------                   1527
Bear Creek, Ky., improvement--------                                                          982
Bear Creek, Md., examination and survey______________--           ------------                294
Beaufort Harbor and River, N. C.:
     Examination and surveys--_________-                        -    -_______________- -      402
     Improvement of harbor--------------------------------------370
     Improvement of waterways to Cape Fear River, including waterway
       to Jacksonville, N. C-----_______----                   ______--_-----375
     Improvement of waterway to Pamlico Sound via Core Sound--_-----                          372
     Improvement of waterway to Jacksonville, N. C ___- ____--------375
     Improvement of waterway to New River__ __________________---375
Beaufort Inlet, N. C.:
     Improvement       ----------------------------------------------                          86
     Improvement of waterway to Norfolk, Va                                                   334
     Improvement of waterway to Pamlico Sound-... ____                     _______---    -    334
     Operating and care, waterway to Norfolk, Va--------------------                          339
     Review of reports, waterway to Norfolk, Va---------------------                          353
Beaufort, S. C.:
     Improvement of waterway to "Charleston-------------------------                          425
     Improvement of waterway to St. Johns River, Fla___                       _____    _ 438, 455
     Improvement of waterway to Savannah, Ga----------------------438
Beaver River, Pa., examination and survey ____________________                        __      954
Beaver Slough, Oreg., review of reports-_____-_______________                         ___ 1354
Belfast Harbor, Maine, improvement                -----------------------------                57
Belhaven Harbor, N. C., improvement-               --                                           355
Bellingham Bay and Harbor, Wash.:
     Improvement of Whatcom Creek waterway                                                  1--------------------
     Review of reports_________-_____________----1398
Benton Harbor Canal, St. Joseph Harbor, Mich., improvement----------1074
Berkeley Harbor, Calif., examination and survey                                              275
                                                                                            1--------------------
Betsie Lake, Frankfort Harbor, Mich., improvement                          _________-
                                                                       -____                1100
Beverly Harbor, Mass., improvement_ --------------------------------                           57
Big Kanawha River, W. Va., operating and care of locks and dams------                        972
Big Lagoon, Fla., improvement of intracoastal waterway via-----------553
Big Sandy River, W. Va., and Ky.:
    Examination          ----------------------------------------------                      977
     Improvement, including Tug and Levisa Forks-------------------                          973
     Operating and care of locks and dams ______________________                             973
Big Sunflower River, Miss.:
     Examination and -survey -------------------------------------                           750
     Improvement                       _____---_____                                         744
     Operating and care of lock and dam ________________________                             746
Big Thoroughfare River, Md., improvement_________-..                        -
                                                                        _______-- -       -  284
Big Timber Creek, N. J., improvement ______________________                         _____    272
Biloxi Harbor, Miss., improvement_____________________                          _            586
Biscayne Bay, Fla., improvement_______-_____________                                         486
Blackfish Bayou, Ark., improvement______--                                                   701
Black Lake, Mich., improvement of Holland Harbor ------------------                         1080
Black River, Ark. and Mo., improvement _______________________757
Black River, La.:
    Examination and survey--------        - - - - --                             - - -        1511
    Improvement -- ___-_- - --        - --    - - - -                            --  -         728
Black River, Lorain, Ohio, improvement--   -                                                  1166
Black River, Mich., improvement-   ------       - ----                            _,          1143
1548                                           INDEX
                                                                                                  Page
Black River, N. C., improvement-_ __-- __-                         -------------                   398
Black River, Wis., operating snag and dredge boats_---------------                                 805
Black Rock Harbor and Channel, N. Y.:
    Improvement           --------------------------------------------- 1206
    Improvement of Lake Erie entrance                         ____--------------------------1206
    Operating and care of canal and lock, etc__----------------------- 1211
Black Rock Harbor, Conn., improvement---------------                             ------------        92
Black Warrior River, Ala.:
    Improvement-------------------------------                                                     568
    Operating and care of locks and dams-------------------------- 577
    Review of reports          --------------------------------------------                        592
Blackwater River, Va., improvement ___-----__-------------------                                   340
Blackwater River, Fla., improvement__----------------------------546
Block Island, R. I.:
    Construction of harbor of refuge -----------------------------                                   73
    Improvement of Great Salt Pond ------------------------------                                  100
Blood River, La., improvement__----------------                                                    607
Boards:
    See also Commissions.
    Beach erosion------             -----------         -------------------------- 1527
    Engineers for Rivers and Harbors--------------------                                             27
    Experimental towboats, Mississippi River____________________                              _    782
    International :
        Lake Memphremagog_ ____----------                   --------                              1534
        Lake of the Woods, board of control------                                                 1--------------
                                                                                               -1536
        Lake Superior, board of control-------------------------------                            1535
        Niagara River, special international_____-------- --                              _------ 1534
        Rainy Lake reference__----------------------------                                        1540
        St. Croix River, Maine, and New Brunswick, board of control .                             1534
        St. Lawrence River, near Massena, N. Y., board of control------ 1535
Boca Ciega Bay, Fla., improvement                ---      -------------------------- 520
Boeuf River, La., improvement --------                        ------------------                   736
Bogue Falia, La., improvement                  -------------------------                           604
Bogues Bay, Va., improvement __-                 ------------------------                          375
Bonfouca Bayou, La., improvement                 -----------------------------                     605
Bon Secours River and Bay, Ala., improvement of intracoastal water-
  way via-       -------------------                           -------------                       553
Bonnet Carre Spillway___--__-----------                     -------------                  1450, 1504
Bonneville, Oreg., construction of dam at_____-----------------------                             1334
Booms, permits for erection of_______----                 __---------------------1515
Boothbay Harbor, Maine, improvement----------------------------                                      57
Boston, Mass. :
    Engineering district__ ___---___                 --------------------                            30
    Improvement of harbor _________----- -___-------------                                           40
    Review of reports on harbor----------------------------------                                    58
Boundary waters :
    Between Lake of the Woods and Lake Superior, surveys and chart-
      ing---------           ---------------------------------------                              1536
    Investigations and surveys:
        Lake Champlain                                                                            1--------------------
        Lake Memphremagog --------------                           ---------------------          1534
        Lake of the Woods ----                 -------------------------                   1529, 1538
        Niagara Falls ---------                -----------------------------                --- 1534
        Rainy Lake, Minn., and Ontario-----------------------                              1529, 1540
         St. Croix River, Maine and New Brunswick, board of control_ _ 1534
         St. Lawrence River, near Massena, N. Y -------------------                               1535
Bradfords Bay, Va., review of reports----------------------------- 294
Brandywine River, Wilmington Harbor, Del., improvement-------------239
Branford Harbor, Conn., improvement-----------------------------                                     83
Brazos Island Harbor, Tex., improvement--                                                            10
                                                                                                   7-------------------
Brazos River, Tex.:
    Examination and surveys_--                  --------------------------                         721
    Improvement of mouth-----------                             ---------------                    692
      Improvement from Velasco to Old Washington-                        -                          720
      Review of reports_ ------ -     ---  -----                             --------------         721
                                              INDEX                                            1549
                                                                                                   Page
Brazos-Santiago Pass, Tex., improvement                                                       ---    10
                                                                                                    7________-------
Breton Bay, Md.:
    Improvement------           ----------------------------------------                            312
    Review of reports _____________________----                                                     312
Bridgeport Harbor, Conn., improvement__----------------------                                        92
Bridges:
    Alteration of, obstructing navigation _____-----------------                          -     - 1515
    Construction across navigable waters_--__---------------------                                115
    Rules governing opening of draws                  --------------------------- 1515
Broad Creek, Md., improvement                        ________-------------293
Broad Creek River, Del., improvement___ __ -279                   __-____--
Broadkill River, Del.:
    Improvement      ----------------------------------------------                                 256
    Review of reports         ----------------------------------------- 273
Broad Sound, Boston Harbor, Mass., improvement---                        -----                       40
Bronx River, N. Y., improvement ---                __       ----      __      ---           -       107
Browns Creek, N. Y., improvement ____-------                -----         ---------------           118
Brul4, Plaquemine Bayou, La., improvement __________--____________                                  648
Brunswick Harbor, Ga., improvement__-----                              ____        _______          444
Budd Inlet, Olympia Harbor, Wash., improvement ______---- -                             -       _ 1369
Buffalo Bayou, Tex., improvement of waterway to Houston __----                                -___ 678
Buffalo, N. Y.:
    Engineer district        ------------------------------------------ 1157
    Improvement of Black Rock Channel and Tonawanda Harbor-....                                   1206
      Improvement of harbor--.... --                                                            1199
    Operating and care of Black Rock Canal and Ferry Street Bridge___ 1211
Bulkhead lines, establishment___________________________        __-_      1515
Burlington Harbor, Vt., improvement------------------------------186
Burr Creek, Conn., improvement ____ -        -     -     -________--__ _-   92
Buttermilk Channel, New York Harbor, N. Y., improvement-______             139
Byram River, Port Chester Harbor, N. Y., improvement --------------- 102

                                                  C
Cache River, Ark., examination                                                                  70
                                                                                               7-------------------
Caddo Lake, Tex. and La., improvement by construction of dam at
  foot of                                                                                      7-------------------
                                                                                               726
Caillou Bayou, La. (Little) :
     Improvement      ----------------------------------------------                           610
     Review of reports-------------------------------------                           ----     649
Calaveras River, Calif., improvement-               -     -____-___ -_____-_____,             1282
Calcasieu Pass and River, La.:
     Improvement           ----------------------------------------------                      641
     Improvement of intracoastal waterway                     ______--------____ -             620
     Review of reports------             ----        ------------------------------ 649
California Debris Commission_----------------------------                                     1429
Caloosahatchee River, Fla.:
     Improvement ----         ------------------------------------------                       496
     Review of reports         ----------------------------------------- 529
Calumet Harbor and River, Ill. and Ind.:
    Examination and survey ------------------------------------                                891
    Improvement of harbor (South Chicago Harbor)-----------------                              875
    Improvement of river _______________________875
Calumet-Sag Channel, Ill., examination and survey __________________                           891
Cambridge Harbor, Md., improvement___________________________                                  293
Camden Harbor, Maine, improvement_____ -                           _______ ____--__        _-   57
Canadian River, N. Mex., Tex., and Okla., examinations with a view to
  control of the floods            _________-----------------_____                  -----      770
Canals :
    See also Waterways.
    Albemarle & Chesapeake Canal, N. C., improvement- -_____-___                       ___     334
    Appropriation for operation and care___                         ____    __                    8
    Benton Harbor Canal, St. Joseph Harbor, Mich., improvement-                               1074
     Black Rock Canal and Ferry Street Bridge, Buffalo, N. Y., operating
       and care-------- ----         -         -__________--                                    1211
     Calaveras River, Calif., to Mormon Channel, San Joaquin River,
       improvement-------_----_-       -       -     -______      __                            1282
1550                                             INDEX

Canals-Continued.
   Cape Cod Canal:                                                                                     Page
          Improvement-------------------------------------------                                         48
         Operating and care_ -------------------------------------                                       54
         Review of reports                    -----------------------                ----------          58
   Cascades Canal, Columbia River, Oreg., operating and care---------1337
   Chesapeake & Delaware Canal, Del. and Md.:
          Improvement        ------------------------------------------                                 242
          Operation and care of canal and locks ___________----- -247
    Colbert Shoals Canal, Ala., operating and care__------------------- 907
   Company Canal, La., improvement of Louisiana and Texas intra-
       coastal waterway           ----------------------------------------                              620
    Dalles-Celilo Canal, Oreg. and Wash.:
          Improvement-----------------------------------------                                        1339
          Operating and care-_---             ------------------------------                          1339
    Dismal Swamp Canal, Va. and N. C.:
         Examination and survey---------------------------------                                        353
          Improvement of waterway via                  ----------------------------- 334
    Drummond Lake Canal, Va. and N. C.:
          Examination and survey of locks at--------------------------                                  353
          Improvement of waterway via_ ----------------------------- 334
    Estherville-Minim Creek Canal, S. C., improvement___---------                                       410
    Hanson Canal, La., operating and care-                     -      ___-------------631
    Harvey Canals, La.:
          Improvement of intracoastal waterway via -------------                                        620
          Operating and care____-----------------------------                                           629
    Illinois and Mississippi Canal, Ill.:
          Examination and survey---------------------------------                                       813
          Improvement of Mill Creek and South Slough ______-                                ____        811
          Operating and care of canal                -----------------------------                      807
    Interoceanic Canal, surveys -----------------------------                                     --- 1513
    Keokuk (Des Moines Rapids) Canal and Dry Docks, Mississippi
       River, operating and care----------------------------------                                      803
    Lake Washington Ship Canal, Wash.:
          Improvement ----------------------------------------                                        1378
          Operating and care------------------------------------1382
    Le Claire Canal, Iowa:
          Improvement -- -------------------------------------                                          782
          Operating and care------------------------                             ------------- 803
    Louisville and Portland Canal, Ohio River, Ky.:
          Enlargement----------------                   --------------------------                      914
          Operating and care--------------------------------------                                      925
    Miami and Erie Canal, Ohio, and branch canal to Lake Michigan,
       etc., examination and survey__________________________________                                   954
   Muscle Shoals Canal, Ala., operating and care__                  -                 -
                                                                            _________----       -       907
   Operation and care, appropriation for-----------------                                                 8
   Port Arthur Ship Canal, Tex.:
         Improvement---------------------------                                                         650
         Review of reports ---                    ----------
                                                         _____________-__                               722
    Sabine-Neches Canal, Tex.:
          Contributions for improvement_----- ---------------                              __           652
          Improvement ------                  ---            ----                                        50
                                                                                                        6-------------------
          Review of reports.--.                                       --
                                                                 -_________--   -   --              -7227---------
    Sag Canal, examination and survey-----------------------------891
    St. Marys Falls Canal, Mich.:
          Improvement                                --------------------------                       1106
          Operating and care-----             -------------------------------- 1114
    San Joaquin River, Calif., Mormon Channel to Calaveras River, im-
       provement ---------------------------------------------                                         1282
    Sturgeon Bay and Lake Michigan Ship Canal, Wis., improvement--..                                   1045
    Thoroughfare Bay to Cedar Bay, N. C., improvement------------- 369
    Willamette Falls Canal, Oreg., operating and care_ .____                               -_______ 1331
Cannes, des Bayou, La., improvement -----------------------                                             637
Cape Charles City Harbor, Va., improvement----                                                          293
Cape Charles Harbor, Va., examination and survey -----                                ------             353
                                                   INDEX                                                  1551
Cape Cod Canal:                                                                                            Page
    Improvement      ----------------------------------------------                                          48
    Operating and care-----              -----------------------------------                                 54
    Review of reports-------------------------------------------58
Cape Fear River, N. C.:
    Improvement above Wilmington                   ------------------------------- 391
    Improvement at and below Wilmington __-___-- --                            ---             --____       388
    Improvement of Northeast Branch ______                            ____________                          396
    Improvement of waterways to Beaufort, N. C., including waterway
       to Jacksonville, N. C            ______----------      ---------                   ___               375
    Improvement of waterway to Winyah Bay, S. C---------                                                    378
    Operating and care of Locks and Dams Nos. 1 and 2 ______--                                  -           400
Cape Lookout, N. C., improvement of harbor of refuge-----------------387
Cape May, N. J., improvement of Cold Spring Inlet, N. J_                              ___ _-_               268
Cape Vincent Harbor, N. Y., improvement_ -__-__-__                           -       -______--- 1229
Carlin Bayou, La., improvement_                        ________                ______----__             _- 635
Carrabelle Bar and Harbor, Fla., improvement ___-. __ ___._______-                                          531
Carters Creek, Va., improvement--------------------------------                                             312
Cascades Canal, Columbia River, Oreg., operating and care_________ -                                       1337
Caseys Pass, Fla., review of reports_______________________________                                         530
Cashie River, N. C., improvement----------------------------------352
Castaigne Bayou, La., review of reports______________________                                  _____        649
Cataco Creek and its branches, examination for flood control------------914
Cavallo Pass, Tex., improvement of channel to Port Lavaca                                         -_____ 7027___-
Cedar Bayou, Tex., improvement_ ____________---                     -      -     -__          ___---        689
Cedar Bay to Thoroughfare Bay, N. C., improvement------------------ 369
Cedar Creek, Conn., improvement_______________                             ___                 ___           92
Cedar Keys Harbor, Fla., improvement _______________________________                                        529
Champlain Lake, N. Y., and Vt.:
     Burlington Harbor, Vt., improvement____---_____                                              __        18SO
    Narrows, improvement                   -------------------------------                                  18
    Plattsburg Harbor, N. Y., improvement---------- -----                                    -       --     188
    Port Henry Harbor, N. Y., improvement_ .... ----                            ___    ---- _____           188
    Surveys and charting__------------- ----                                                               1529
Chandlers River, Maine, review of reports ___________-____                             ____             -    58
Channels. See Rivers and harbors, Canals and Waterways.
Charles River, Boston, Mass., improvement--------------------------40
Charleston, S. C.:
    Engineering district----------------------------------------                                            403
    Improvement of harbor--------------------------------------                                             416
    Improvement of waterway to Beaufort_______--- -                          --         -      -        _   425
     Improvement of waterway to Winyah Bay ___ -                         -- __              -______-_ 410
Charlevoix Harbor, Mich., improvement -------                                ___-________                  1102
Charlotte Harbor, Fla., improvement_                                                                        508
Charlotte (Rochester) Harbor, N. Y., improvement ________-                                -_________ 1216
Charts and maps, northern and northwestern lakes___________________                                        1528
Chattahoochee River, Ga. and Ala.:
    Examinations and surveys----------------------------------                                              592
    Improvement below Columbus________----                 -      _ ___------------                         591
Cheboygan Harbor and River, Mich., improvement of harbor---------- 1156
Cheesequake Creek, N. J., improvement                                                                       2-------------------
Chefuncte River, La., improvement_____--                 __----------_____                      _____       604
Chehalis River, Wash.:
    Examination and survey_ -__------------------___                                                       1398
    Improvement ----             --------------------------------------                                    1363
Chelsea Creek, Boston Harbor, Mass., improvement_----__                             _-----...-               40
Chequamegon Bay, Ashland Harbor, Wis., improvement--------------- 1006
Chesapeake and Albemarle Canal, N. C., and Va., improvement ---------- 334
Chesapeake and Delaware Canal, Del. and Md.:
    Improvement       ----------------------------------------------                                        242
    Operating and care of canals and locks-------------------------247
Chesapeake Bay, Md. and Va.:
    Thimble Shoal, improvement --                  ----------------------------- 318
    Waterway to Tangier Sound, via Ewell, Md., review of reports ----                                       294
      York Spit, removal of shoals opposite ---                      ------              ---          -     274
        91536-FENG 1934-           98
1552                                             INDEX
                                                                                                     Page
Chester River, Md-             ---------------------------                                       _-- 293
Chester River, Pa., improvemen               ---------------------------------                       272
Chicago Harbor and River:
    Improvement of harbor-----------------                         --------------------              870
    Improvement of river            --------------------------------------                           873
    Improvement of South Chicago Harbor_ __                            _____------------             875
    Revisory surveys           -----------------------------------------                            1530
Chicago, Ill., engineering district__________--                -------------                          850
Chico Bayou, Fla., examinations and surveys__________---------------                                  592
Chien Lake, La., to intracoastal waterway, examination                                                6_______------49
Chincoteague Inlet and Bay, Va.:
     Waterway on coast of Virginia, improvement--____---------------                                  293
     Waterway to Delaware Bay, improvement-----------------------                                     257
Chipola River, Fla.:
     Improvement of lower river_______________--------------------                                    535
    Improvement of upper river----------------------------------                                      538
Chippewa River, Wis., operating snag and dredge boats_____________                                    805
Chocolate Bayou, Tex., improvement -------__-----------------------                                   720
Choctawhatchee River, Fla. and Ala.:
     Examination and survey of waterway to bay _______________                                  _     592
    Improvement of East Pass Channel_____________________________                                    591
    Improvement of river            --------------------------------------                           591
Choptank River, Md., improvement                       _____________________________                  293
Christiana River, Del., improvement of Wilmington Harbor----------                                    239
Cimarron River, N. Mex., and Okla., examination with a view to control
  of the floods     --------------------------------------------                                      770
Cincinnati, Ohio, engineering district ____________________________                                   977
Claiborne Harbor, Md., improvement ___________________....                                           293
Clatskanie River, Oreg., improvement___---____________                             ________         1325
Clear Creek and Lake, Tex. :
    Examination and survey                                                 __-____      _--__         7_____________
                                                                                                     722
    Improvement of creek            --------------------------------------                           691
Clearwater Harbor, Fla.:
    Examination and survey               ----------------------------------- 529
    Improvement of channel to Tampa Bay______________                               __________       520
Cleveland Harbor, Ohio, improvement _....____                      --------           _______       1172
Clinch River, Tenn., and Va., improvement___________________________                                  913
Coan River, Va., review of reports-------------------------------                                     312
Cockrells Creek, Va., improvement---------------------------------312
Coden Bayou, Ala., review of reports- __________                         -_______________ 592
Coenties Reef, New York Harbor, N. Y., removal ------------------                                  - 144
Cohansey River, N. J., improvement__--_ --                       __ -    -     -     -   -    -       265
Colbert Shoals Canal, Tennessee River, Ala., operating and care-------- 907
Cold Spring Inlet, N. J., improvement____           -     ___ ------------
                                                                      __                             268
Coldwater River, Miss., improvement                                                                    50
                                                                                                      7-------------------
Colgate Creek, Md., examination and survey-                     --                                    294
Colorado River, Tex., review of reports- .... _____.    -_____   --    __-                             722
Columbia River, Oreg., and Wash.:
    At Bakers Bay, Wash., improvement ______           _____1351
    Bonneville, Oreg., construction of dam at _______.... ___.-____                                  1334
    Cascades Canal, operating and care_____________________________                                  1337
    Celilo Falls to Snake River, including tributaries, improvement from_                            1354
    Celilo Falls to The Dalles Rapids, improvement_____________________                              1339
    Celilo Falls to The Dalles Rapids, operating and care of canal and
        locks---------------------------------                                                       1339
   Examinations and surveys                                       354, 1398
                                                                 1___________________
   General statement regarding-    -___   -  -          -
                                                    -________--    -___1313
   Mouth, improvement     --------------------------------------- 1313
   Mouth to Willamette River, improvement      ____ ___________          131.8
   Review of reports                                              354, 1398
                                                                 1------------------------
   Wenatchee to Kettle Falls, Wash., improvement1__________________       398
Commencement Bay, Wash., improvement ______________________-             1372
Commerce for calendar year 1932------
                                .-                                           4
Commissions :
   See also Boards.
   California Debris Commission                                                                      1429
                                                       INDEX                                     1553
Commissions-Continued.                                                Page
   Federal Power Commission, investigations and supervision of proj-
     ects under___--------------------- ----------------------- 1514
   Mississippi River Commission _--------------------------------1445
   Permanent International Association of Congresses of Navigation_-_ 1512
Company Canal, La., improvement of Louisiana and Texas intracoastal
  waterway       --__________                   _--------                                           620
Compton Creek, N. J., improvement___________--------                                 211
Conecuh River, Ala., improvement_ ------ __--_-------------                          547
Conemaugh River, Pa., examination and survey----------------------                   954
Coney Island Channel, N. Y., improvement_______---           ----------------        133
Congaree River, S. C.:
    Improvement_---------------------------------------                       ----- 428
    Operating and care of lock and dam               _____________-_____--           415
Congresses of Navigation, Permanent International Association of ..... 1512
Conneaut Harbor, Ohio:
    Improvement      _      -                                                       1188
    Review of reports         --------------------------------------- 1237
Connecticut River, Mass. and Conn. :
     Examinations             -_                            --           --------                   101
    Improvement above Hartford, Conn--     _                                                        100
    Improvement below Hartford, Conn-----------------------------                                    79
Consolidated cost and financial summary---               -                                           13
Constable Hook to Ellis Island, New York Harbor, examination and
  survey --                        -----------------                                                189
Contentnea Creek, N. C., improvement____                                                              365
Cooper River, N. J., improvement            --------------------------------                          259
Coosa River, Ga. and Ala.:
     Improvement_                 ---------------------------------------                             591
     Operating and care of locks and dams __..________                                __-___          562
Coosaw River, S. C., improvement of waterway via_____________________                                 425
Coos Bay, Harbor, and River, Oreg.:
     Improvement of entrance to bay and harbor___ _______________                                   1299
     Improvement of river-___ _________                              -_________-__ --     --        1302
     Review of reports_------                 ____                                      -           1354
Copperas Creek, Ill., lock and dam, operating and care ______                           ______        864
Coquille River, Oreg.:
     Improvement      ---------------------------------------------                                 1297
     Review of reports       -----------------------------------------                              1354
Cordova Harbor, Alaska, review of reports___________-____________                                   1398
Corea Harbor, Maine, review of reports-----------------------------                                    58
Core Sound, N. C., improvement of waterway to Beaufort Harbor                          ------         372
Corney Bayou, La., improvement                               -------------                            738
Corpus Christi, Tex.:
     Examinations and surveys_______________________-
                                                 -___-_                                          649, 721
     Improvement of channel to Aransas Pass__--                    -_______- ________                 700
     Improvement of intracoastal waterway to the Mississippi River___ 620, 657
Corsica River, Md., improvement____________________________________                                   293
Cos Cob Harbor, Conn., improvement---                ___            _________-___                     100
Cowlitz River, Wash.:
     Examination for flood control ------------------------------- 1354
     Improvement----         -----------------------------------------                              1344
Cowpasture River, Va., improvement of James River, Va_____________                                    321
Craft, sunken, removal of          -------------------------------------- 1516
Craven Shoal, New York Harbor, improvement_ ______________________                                    128
Crescent City Harbor, Calif.:
     Improvement _                   -------------------------                                      1274
     Review of reports----------------------------------------                                      1275
Crescent Lake and Dunns Creek, Fla., improvement                            ---      ----             529
Crisfield Harbor, Md.:
     Improvement _------          --------------------------------------                              293
     Review of reports                                       -----         -----------       ---      294
Croatan Sound, N. C., improvement of waterway via------------------331
Cromline Creek, N. Y., examination for flood control--                                              189
Cross Rip Shoals, Mass., improvement_------------                                                    62
Crystal River, Fla. :
    Improvement __-- ___-________-------_---------                                                  529
    Review of reports_______-__--_-__-----------------                                              529
1554                                           INDEX

Cumberland River, Ky. and Tenn.:                                                          Page
   Above Nashville, improvement__--------------------------------
                                                          _                                913
   Below Nashville, improvement_ __-___-_
                                       _                                                   891
   Operating and care of locks and dams-------------------------                           895
Cumberland Sound, Ga. and Fla.:
   Examination and survey of waterway to Mississippi River- -.....                         454
     Improvement                    ___   --------------------                             452
    Improvement of waterway between Savannah and Fernandina --- _                   438
    Improvement of waterway to St. Johns River, Fla- -___--_____                    455
Current River, Ark. and Mo., improvement --------------------------                 760
Curtailment and abandonment of river and harbor projects, review
of reports     -------------------------------------------------                  1515
Curtis Bay, Baltimore, Md., improvement of channel to------                    ___  274
Curtis Creek, Md., examination and survey ______________________-                   294
Cutler Bayou, La., improvement ----------------------------------
                                              _                                     609
Cuyahoga River, Cleveland, Ohio, improvement--------------------- 1172
Cypress Bayou, Tex. and La.:
    Construction of dam at foot of Caddo Lake----------------------726
    Improvement of, including connecting lakes between Shreveport, La.,
      and Jefferson, Tex               ---------------------------------------      726
Cypress Top Outlet, Choctawhatchee River, Fla., improvement ---------- 591
                                                    D
Dalecarlia Reservoir, Washington, D. C' --____________                     -  --_     1525
Dalles-Celilo Canal, Oreg. and Wash.:
     Improvement      --------------------------------------------- 1339
     Operating and care    ----------------------------------------                     339
D'Arbonne Bayou, La., improvement                                                        38
                                                                                        7-------------------
Darien, Ga., improvement of harbor ------------------------------ 454
Dashields Dam, Pa.:
     Construction     ---                                                               914
     Operating and care     ---------------------------------------- 925
Davis Creek, N. C., improvement of waterway via ____________                      -_____378
Dawho River, S. C., improvement of waterway via _____________--___                      425
Deals Island, Md.:
     Lower Thoroughfare, improvement ------------                                       293
     Upper Thoroughfare, improvement --------------------------                         282
Debs Inlet, N. Y., improvement            __          --------------------              12.0
Deep Bay, N. C., improvement of waterway to Swan Quarter Bay _____                      354
Deep Creek, Fla., improvement------                   -----------------                 529
Deep Creek, Va., improvement of waterways to sounds of North Caro-
  lina via Elizabeth River       ------------------------------------                   331
Deep Fork, Okla., examination with a view to control of the floods                      770
Deep River, Wash., improvement--            ------------------------------ 1350
Delacroix Island and Terre au Boeuf Bayou. La., review of reports__.                    649
Delaware and Chesapeake Canal, Del., and Md.:
     Improvement-----------------                 ---------------------------          242
     Operating and care of canal and locks___________________ ____                     247
Delaware Bay and River, Pa., N. J., and Del.:
     At Camden, improvement_              __________________----------                    234
    .Breakwater and harbor of refuge in bay, improvement------------ 272
     Intracoastal waterway to New York Bay, examination and survey__            219
     Philadelphia and Camden Harbors, improvement---------            220, 226, 234
     Philadelphia to sea, improvement -----------------------------             226
     Philadelphia to Trenton:
          Improvement------------------------------------------                 220
         Review of reports--------------------------------------                273
     Review of reports-----       ----------------------------------            273
     Waterway to Chesapeake Bay, Del. and Md.:
          Improvement     ------------------------------------------           242
          Operating and care-------------------------------------               247
         Review of reports-----       -------------------------------           273
     Waterway to Chincoteague Bay, improvement ------------------               257
     Waterway to Rehoboth Bay:
         Improvement ___--         _-__272 ------
          Review of reports ---------------------------                                   273
                                                 INDEX                                             1555
                                                                                                       Page
De Pere, Wis., improvement of Green Bay Harbor-------------------1032
Derelicts. See Wrecks.
Des Cannes Bayou, La., improvement-------                    _                637
Des Plaines River, Ill., improvement ------------------------------ 851
Detroit, Mich., engineering district ------------------------------ 1106
Detroit River, Mich.:
     Improvement       --------------------------------------------- 1129
     Improvement of channels in waters connecting Great Lakes-------- 1106
    Topography and sounding      ----------------------------------- 1530
Diamond Reef Channel, N. Y., improvement ------------------------ 144
Dickinson Bayou, Tex., improvement                ----------                  720
Dismal Swamp Canal, Va. and N. C.:
     Examination and survey ------------------------------------              353
     Improvement of waterway via---------------------------                   334
District of Columbia:
               Park
    AnacostiaAnacotia---
               Prk------- _   --
                             __1520
                                  ---------------------------------- 12
     Anacostia River, reclamation of flats-------------------------          1520
    Aqueduct, increasing water supply         ------------------------ 1524, 1527
      Aqueduct, maintenance and repair------------_                                                    1524
     Government buildings, consumption of water in --------                                            1524
     Improvement of Potomac River                    -------------------------------                    295
     Water supply, increase in--              ------------------------------- 1524,                    1527
Dock Lines, establishment_--             ---------------------------------                            1515
Dog Island Harbor, St. George Sound, Fla., improvement--------------                                    531
Dog River, Ala., review of reports_          ------------------------------                            592
Dog River, Miss., improvement-------------                                 --------------              580
Dorchester Bay, and Neponset River, Mass.:
     Improvement---------------------------------------------                                            57
     Review of reports_-------------------------------------------                                       58
Double Bayou, Tex, improvement -----------                         -----                  ----         685
Drawbridges:
     See also Bridges.
     Rules for opening---------------                      -------------                               1515
:Drawings, northern and northwestern lakes ----------------                              -----         1528
Drift removal from New York Harbor--------------------                                          165,   1517
Drummond Lake Canal, Va. and N. C.:
     Examination and survey of locks at---------------------------                                     353
     Improvement of waterways via-------------------------------                                       334
Duck Creek (Smyrna River), Del., improvement----------------------                                    248
Duck Island Harbor, Conn., construction of harbor of refuge-                             -82
Duluth, Minn.:
    Engineering district                -------------------------------                                998
     Improvement of Duluth-Superior Harbor-----------------------                                      999
Dunkirk Harbor, N. Y.:
     Improvement __          ------------------------------------                                      1197
    Review of reports ___-                                                                             1237
Dunns Creek and Crescent Lake, Fla., improvement                                                        529
Dupont Bayou, La., improvement----------------- ------------                                            609
Duwamish River, Wash., improvement of east and west waterways,
  Seattle Harbor___-------            -----------------------------------                              1376
Duxbury Harbor, Mass., improvement                                        ------                         57
Dymers Creek, Va., improvement_-                                                                        312

                                                    E
Easements, flowage, on Lake of the Woods------------------------1536
East (Ambrose) Channel, New York Harbor, N. Y., improvement ---..     128
East Chester Creek, N. Y., improvement---------------------------     188
Eastern Bay, Claiborne Harbor, Md., improvement-------------------    293
Eastern Branch, Elizabeth River, Va., improvement of Norfolk Harbor__ 313
East Norwalk Harbor, Conn., improvement---------------------------     95
East Pass Channel, Fla., from Gulf of Mexico into Choctawhatchee Bay,
  improvement ____------------                                                                         591
East Pass., Fla., improvement of Carrabelle Harbor--
                                                  ..............                              _        531
1556                                        INDEX
                                                                                       Page
East Pearl River, Miss., improvement______   ---------------------                      591
East River, Brunswick Harbor, Ga., improvement------------------- 444
East River, N. Y.:
     Improvement, including Coenties Reef___--------           -------------            144
     Review of reports------        ----------------------------------                  189
East Rockaway (Debs Inlet, N. Y., improvement                                            120
Echo Bay Harbor, N. Y.:
    Improvement       ----------------------------------------------                    188
     Review of reports                                                                    89
                                                                                         1-------------------
Edenton Harbor, N. C., improvement_--------------------------                           352
Edgartown Harbor, Mass., improvement_____--      ---------------------                  100
Edisto River and its branches, South and North Edisto, S. C., examination
  for flood control ---------------------------------------------                        428
Edmonds Harbor, Wash., review of reports-----------_                                   1398
Eel River, Mass., improvement of Plymouth Harbor-                    --
                                                              --________       ___--46
Electrical power, Niagara River, N. Y., control and regulation                    ---------
                                                                                        534
Elizabeth River, N. J., improvement-----------------------------199
Elizabeth River, Va.:
     Examination and survey-------------------------------------                        353
     Improvement of Norfolk Harbor, including Eastern, Southern, and
       Western Branches---------------------------------------                           313
     Improvement of waterways to sounds of North Carolina via Pasquo-
       tank River--                                                                     3-------------------
                                                                                        331
     Review of reports-----------------------------------------------                   353
Elk River, Md.:
     Improvement _       -------------------------------------------                    293
     Review of reports------------------------------------                   ------ 294
Elliot Bay, Wash., improvement of Duwamish River and east and west
  waterways-                                                                           1--------------------
Emergency relief and construction act of July 21, 1932_____-_________                     10
Emeryville Harbor, Calif., examination and survey----------------                      1275
Empire Cut, Calif., improvement                                                        1____________-
                                                                                       1290
Emsworth Dam, Pa., operating and care___             ---____        __--____             925
Engineers, the Board of, for Rivers and Harbors-_ -              ______ __        __      27
English Kills, Newtown Creek, N. Y., improvement___________ _______152
Erie and Miami Canal, examination and survey--                                           954
Erie Basin, N. Y., improvement of channel in Lake Erie                                   206
                                                                                       1---------------
Erie Harbor, Pa.:
     Examinations and surveys-------------------------------------                       954
     Improvement-----------------------------------                      --------- 1194
Erie, Lake :
     Black Rock Harbor, improvement of entrance to                    ___              1206
     Channels in waters connecting Great Lakes, improvement                            1106
     Examination and survey of waterways to Ohio River__                                 954
     Surveys, charts, etc., of northern and northwestern lakes----------1528
     Water levels__         -1528 _____
Escambia River, Fla., improvement__                                          _           5______---_____
                                                                                        547
Esopus Creek, N. Y., improvement of Saugerties Harbor -                                  173
Estherville-Minim Creek Canal, S. C., improvement ........                               410
Estimates of appropriations required:
     Miscellaneous civil works .________         -                      -_________ 1517
                                                               -___________
     Rivers and harbors, etc         --                                                   27
Eureka, Calif., improvement of channel in front of-------------------1271
Everett Harbor, Wash.:
     Improvement _---------                                                ----               1383
   Review of reports__----------------------------------------1398
Expenditures :
   Miscellaneous civil works                                    1516
   Rivers and harbors--.------                                    10
Experimental towboats, board on____
                                 ----------       __________-782

                                               F
Fairhaven Harbor, Mass., improvement ----           -              -   -          -   -   -   -64
Fairport Harbor, Ohio, improvement- -------------                                              1178
Falia, Bogue, La., improvement-----       -       -                -        -         -         604
                                        INDEX                                    1557
                                                                                   Page
Fall River Harbor, Mass., improvement ____66
Fancy Bluff Creek, Ga., improvement--___---------------------     ----- 449
Far Creek, N. C., improvement-------------------- ---------------        356
Feather River, Calif.:
    Improvement __---------------------------------           --------- 1289
    Work of California Debris Commission ___----__                  -   1429
Federal Power Commission, Niagara Falls power companies, supervision
  and inspection-_                                                           1514, 1535
Federal Water Power Act, investigation and supervision of projects-----            1514
Fenwicks Island Cut, S. C., improvement of waterway via _____________               425
Fernandina Harbor, Fla.:
     Improvement -----------              ----------------------------------        452
     Improvement of waterways to Savannah, Ga.                                      438
Fighting Island Channel, Detroit River, Mich., improvement ____ -                  1129
Filtration plant, Washington Aqueduct, D. C-----------------------1524
Financial summary as of June 30, 1933__------------------------------                13
Fire Island Inlet, N. Y., review of reports________----__---------------            189
Fishers Island, N. Y., improvement of Hay (West) Harbor                             100
Fish traps or weirs:
     Inspection expenses-__    --- __------_____--                                 1515
     Permits for construction-------                    -------------------------- 1515
Fivemile River Harbor, Conn.:
     Improvement---------------------------                                          96
     Review of reports------           -------------------------------              101
Flathead Lake, Mont., improvement of Poison Bay-------------------                 1398
Flint River and Creek, Ala. and Tenn., examination for flood control----            914
Flint River, Ga.:
     Examinations and surveys                           -------------              592
    Improvement-------------------------------------                               591
Flood control:
    On Mississippi River and tributaries----------------_  ___                  4,1445
    On Rio Grande, near San Benito, Texas ________---------___                     '720
     On Sacramento River, Calif___       ------------                             1435
     Surveys for-- ----------------------------------------                         1424
Florida East Coast Canal, improvement of intracoastal waterway, Jack-
  sonville to Miami, Fla., via ___________________--_____--____-                      469
Florida (northern), examination and survey of waterway across, to
  connect the Atlantic intracoastal waterway with proposed Gulf intra-
  coastal waterway -------------------------------------                       ---   454
Florida, removal of water hyacinths from waters of State ..... 526, 588, 645
Flushing Bay, N. Y., improvement__ ____ ___-______--_                                109
Fore (Weymouth) River, Mass., improvement_______----__--                               57
Fore River, Portland, Maine, improvement _________--..__                               31
Forked Deer River, Tenn., review of reports                                            70
                                                                                     7_____________
Fort Peck, Mont.:
     Construction of reservoir            ----------------------------------- 841
     Engineering district-____________                                               822
Fort Pierce Harbor and Inlet, Fla.:
     Improvement of harbor            ------------------------------------- 477
     Review of reports-------------------------------                                529!
Fort Point Channel, Boston Harbor, Mass., improvement___ --                  -
                                                                         ____-         40
Fox Head Point and Rye Beach, examination of coast of New Hamp-
  shire between     -----------------------------------------------                    58
Fox River, Wis.:
     Examinations__             ______-___                             _   ____1105
     Improvement       ---------------------------------------------               1037
     Improvement of Green Bay Harbor .............                                 1032
     Operating and care of locks and dams-------------------------1044
Foys Flats, N. C., improvement of Trent River at--- ____-- -              ___-       367
Frankford Creek, Pa., review of reports                                              273
Frankfort Harbor, Mich., improvement-----                                          1100
Freeport Harbor, Tex., improvement_--_______-___------               -     ___-      692
French Broad and Little Pigeon Rivers, Tenn., improvement ----------               913
French Creek, Pa., examination and survey of waterway via-- - -                    954
Furlough and compensation deductions--..-- --       ---     ---    --                9
1558                                          INDEX

                                                  G
                                                                                                Page
Galena River, Ill., operating snag and dredge boats_---_____---                -------         805
Galveston Bay and Harbor, Tex.:
    Examinations and surveys------------------------------------                               722
    Improvement of Galveston Channel________________________                                   669
    Improvement of Galveston-Texas City Channel _____________----                              672
    Improvement of harbor entrance________-_____________----_                                  664
     Improvement of Port Bolivar Channel_______________________-                               676
    Improvement of waterway to Houston-                                     ______-----------  678
Galveston, Tex., engineering district_____________________________                             649
Gasconade River, Mo., improvement___ __________________-___                                    850
Gastineau Channel, Alaska, examination and survey _________----1398
Gaging:
    Mississippi River and principal tributaries_____---                  ___ -____---          818
    Northern and northwestern lakes, level___________________-------                          1528
Gedney Channel, New York Harbor, N. Y., improvement---------------                             128
General Joe Wheeler Dam, Tennessee River, improvement _______-----898
Genesee River, Charlotte Harbor, N. Y., improvement__________------216
George, Lake, channels in waters connecting Great Lakes, improvement__ 1106
George, Lake, St. Johns River, Fla., improvement___________________                            462
Georges River (Thomaston Harbor), Maine, improvement_____------30
Georgetown Harbor, D. C., improvement of Potomac River at----------295
Georgetown Harbor, S. C., improvement of Winyah Bay______________                              378
Georgia (southern), examination and survey of waterway across, to
  connect the Atlantic intracoastal waterway with the proposed Gulf
  intracoastal waterway       ----------------------------------------                         454
Gladstone Harbor, Mich, improvement                   ----------------------------1105
Glencove Creek, N. Y., improvement-------------------------------112
Gloucester Harbor, Mass., improvement _________________________                                 35
Government buildings, District of Columbia, consumption of water in___                        1524
Gowanus Creek Channel, New York Harbor, N. Y., improvement--------                             143
Grand Bayou Pass, La., examination and survey ______ ________ __                               649
Grand Haven Harbor, Mich.:
     Improvement--------------                ------------------------------- 1083
     Review of reports-------------------                                                     1105
Grand Lake, Mermentau River, La., improvement___________________                                37
Grand Marais, Mich., improvement of harbor of refuge                                          1020
Grand Marais, Minn., improvement of harbor----------------------- 994
Grand Pass, La., improvement-_                        _ _ __             __                    609
Grand Rapids, Wabash River, Ind. and Ill., operating and care of lock
  and dam                                                                                       93
                                                                                               9-------------------
Grand River, Fairport Harbor, Ohio, improvement ------------------- 1178
Grand River, Mich. :
    Improvement    ......            ___
        Impro-vement---------------------------------------------18                           1083
     Review of reports       ---------------------------------------- 1105
Grays Harbor, Wash.:
     Improvement of inner portion__------------                                               1363
     Improvement of entrance          ----------------------------------- 1360
     Review of reports             ----------------------------------------                   1398
Grays Reef Passage, Mich., review 'of reports-                                                1105
Grays River, Wash., improvement ________                      ___________________             1348
                                                         --
Great Kills, Staten Island, N. Y., improvement____________________                             202
Great Lakes :
     Channels in waters connecting, improvement______________________                         1106
     Control and regulation of waters of Niagara River and preservation
       of Niagara Falls _____ ______                        -       -____--       -      -    1534
     Discharge                                                                                1528
    Elevation---------------              ---------------------------------                   1528
     Examination and survey of Miami and Erie Canal, branch canal to
       Lake Michigan, and other routes between Lakes Erie and Mich-
       igan and the Ohio River----------------------------------                               954
     Review of reports of deeper waterways to Atlantic tidewater___ 1156, 1237
     Review of reports on deeper waterway to the Hudson River                                 1237
    Surveys, charts, etc., of northern and northwestern lakes---------- 1528
   Water levels-_ -- -___                                               1530
Great Miami River, Ohio, examination and survey ________ - - - - 981
                                             INDEx                                         1559
                                                                                            Page
Great Peedee River, S. C., improvement_ _______________-----                                 408
Great Salt Pond, Block Island, R. I., improvement_-__             ----       --------        100
Great Sodus Bay, N. Y., improvement of harbor____________--------                           1220
Great South Bay, N. Y., improvement-----------------------------                             117
Green Bay Harbor, Wis.:
     Examinations and surveys-----------------------                                        1105
     Improvement-------           ------------------------------------                      1032
Green Jacket Shoal, Providence River, R. I., removal----------------- 69
Green River, Ky.:
     Improvement.-   --------------------------------------------                            982
     Operating and care of locks and dams_------ ----------------                            989
Green River, Wash., examination for flood control-------------------                        1399
Greenport Harbor, N. Y., improvement __________------_-------                                188
Greenwich Harbor, Conn., improvement--___-------------------------100
Griffin Lake, Fla., waterway to Kissimmee River, review of reports__                         530
Grosse Pointe Channel, Lake St. Clair, Mich., improvement_                       _____----- 1123
Grossetete Bayou, La., improvement_______________ __-_____---_                               613
Guadalupe River, Tex.:
     Examinations and surveys--____________-----                                             722
     Improvement to Victoria_____----- --------                                              720
Gulfport Harbor, Miss., improvement --                -------------------------              582
Gull Lake, Minn., reservoir dam:
     Construction-----------           -----------------------------------                   814
     Operating and care------------------------------------------817
                                                H
Hackensack River, N. J., improvement---------                          _____---                190
Hales Bar Lock and Dam, Tennessee River, operating and care------                              907
Hampton Creek, Va., improvement___ __                  -------
                                                        __-                   __   -     __
                                                                                         --    352
Hampton Roads, Va., improvement           of   approaches        to  Norfolk   Harbor  ___     313
Hanson Canal, La., operating and care -------                       __--------       ------    631
Harbor Beach, Mich., harbor of refuge, improvement_____
Harbor Cove, Gloucester, Mass., improvement -------
                                                                           __________
                                                                        _______-______
                                                                                              1141
                                                                                                35
Harbor Island Basin, Tex., improvement_________________________-_                              703
Harbor lines, establishment ________________________ _                                        1516
Harbors and rivers. See Rivers and harbors.
Harlem River, N. Y., improvement_____--           ________________                             155
Harvey Canals, La.:
     Improvement of intercoastal waterway -______- -______-_____ -                             620
     Operating and care-----------------------------------------                               629
Hastings Lock and Dam, Mississippi River:
     Improvement     ----------------------------------------------                            782
     Operating and care_---------------------------------                                  -- 803
Hatchie River, Tenn., review of reports____________________________                            770
Havre de Grace, Md., improvement of Susquehanna River at------------ 293
Hawaiian Islands:
     Hilo Harbor, improvement ----------                ------------------------              1406
    Honolulu Harbor, improvement---------------                                               1400
     Kahului Harbor, improvement--              ----------------------------- 1404
     Kaunakakai Harbor, improvement-------                     --------------------- 1413
     Nawiliwili Harbor, improvement                     ----------------------                1408
     Port Allen Harbor, improvement------------------------------ 1410
Hawaii engineering district----------------                                                   1400
Hay Lake (Nicolet Lake) Channel, St. Marys River, Mich.:
     Improvement___   ---------------------------------------------
                                    ____                                                      1106
    Improvement of channels in waters connecting Great Lakes---------- 1106
Hay (West) Harbor, N. Y., improvement_ .__-______-__                            -      -______ 100
Hell Gate, East River, N. Y., improvement _________________----___                             144
Hempstead Harbor, N. Y., improvement____________________                                       111
Hendry and Knight Channel, Fla., improvement of Tampa Harbor--------                           511
Hennepin Canal (Illinois and Mississippi Canal), Ill., operating and care_                     807
Henry Lock and Dam, Illinois River, Ill., operating and care                                   864
Herring Bay and Rockhole Creek, Md., improvement----                                         293
Hillsboro Bay and River, Fla., improvement-- -----------                                     511
Hingham Harbor, Mass., improvement-...........----
                                         -          _                                         57
1560                                       INDEX

                                                                                           Page
Hilo Harbor, Hawaii, improvement_-                       __-------------------------- 1406
Hiwassee River, Tenn., improvement                     --------------------------        913
Hog Island, Va., to the Great Machipongo Inlet, examination and survey
of channel-------------------------------------------------                             24
Holland Harbor, Mich., improvement_______                           ___________________ 1080
Hollywood Harbor, Fla.:
    Improvement-------                ---------------------------------------            484
    Review of reports                 -------                                            529
Holmes River, Fla., improvement---------------------------------591
Homosassa River, Fla., review of reports_______________________                          529
Honga River, Md., review of reports_______________________________                       294
Honolulu, Hawaii:
    Engineering district---------------------------------------                         1400
    Improvement of harbor___ ------------------------------------- 1400
Hoquiam River, Wash., improvement________________________________                       1398
Horn Harbor, Va.:
    Improvement           ----------------------------------------------                 312
    Review of reports------ ----------------------------------- 312
Housatonic River, Conn., improvement--------------------------------                      90
Houston to Galveston ship channel, Tex., improvement----------------                     678
Howard Bay. N. C., examination and survey of waterway via                                402
Hudson River, N. Y.:
    Improvement above New York                                                            74
                                                                                         1-------------------
     Improvement at New York----------                   -     -    -     -          -_     157
     Peekskill Harbor, improvement.----             ----------------------                  169
     Review of reports----                ---         ----          ---                     189
    Review of reports on waterway to Great Lakes-------------------1237
    Rondout Harbor, improvement-                       --------------------              171
    Saugerties Harbor, improvement__ _____                    _____________     ___      173
    Tarrytown Harbor, improvement____________________                            -___    167
    Troy Lock and Dam, operating and care_______                         _____           182
Hueneme Harbor, Calif., examination and survey____________________                     1252
Humboldt Bay and Harbor, Calif. :
    Improvement -----------------
                       __                                                              1271
    Review of reports-----------------------------------------                         1275
Huntington Harbor, N. Y., improvement_______________________________                     115
Huntington, W. Va., engineering district---------------------------- 962
Huron Harbor, Ohio, improvement__________________________                              1162
Huron Lake:
    Channels in waters connecting Great Lakes, improvement----------                    1106
    Surveys, charts, etc--        -------------------------------------- 1528
    Water levels     --------------------------------------------- 1528
Hutchinson River (East Chester Creek), N. Y., improvement------------ 188
Hyacinths, water, removal:
    From Alabama, Mississippi, Louisiana, and Texas waters                --------  588, 645
    From Florida waters ________                       _________-      _       526, 588, 645
Hydraulic mining in California, regulation and preparation of plans....                1429
Hydraulics. See Water levels.
Hydrology. See Water levels.
                                                I
Illinois and Mississippi Canal, Ill. :
     Examination and survey _       --------------------------------    813
     Improvement of Mill Creek and South Slough _________________     _ 811
     Operating and care of canal ---------------------------------      807
Illinois River, Ill.:
     Examination and survey____--------- -----                   __     981
     Improvement _____      ___-______---                               851
     Operating and care of locks and dams--------------------------864
     Operating snag boats and dredge boats____________________________  805.
Indiana Harbor Canal, Ind., review of reports ______________________891
Indiana Harbor, Ind., improvement---- __                                881
Indian River, Fla. :
     Improvement of intracoastal waterway, Jacksonville to Miami, Fla.,
       via___--___---                                                                       469
     Review of reports ------------------------                                             530
                                         INDEX                                     1561
Inland waterways. See Canals and Waterways.
Inside routes. See Canals and Waterways.
Insular possessions:                                                                 Page
     Honolulu, Hawaii, engineering district                                          1--------------------
     Puerto Rico, engineering district___                                            1415
International Association of Congresses of Navigation ---------------                1512
International boundary waters__----------------------------------_                   1534
Interoceanic Canal, survey                                                          1513
Intracoastal waterways. See Canals and Waterways.
Ipswich River, Mass-........                                                           57
Irrigation, surveys for----------------------                                        1424

                                            J
Jackson Creek, Va., review of reports-----------------------------                    312
Jackson River, Va., improvement of James River, Va------------------                 321
Jacksonville, Fla.:
     Engineering district------_--------------------------------                      455
     Improvement of intracoastal waterway to Miami, Fla ......---                     469
     Improvement of St. Johns River opposite-- -----------------------                455
     Review of reports of St. Johns River to Palatka-------------------               530
Jacksonville, N. C., improvement of waterway to Beaufort-------------                 375
Jamaica Bay, N. Y., improvement_ ---------------------------------                    125
James River, Va.:
     Improvement                                                                      321
     Review of reports____----------------------___-------------------                353
Jefferson-Shreveport Waterway, La., and Tex., improvement-------------                726
Jeffries Point Channel, Boston Harbor, Mass., improvement -----------                  40
Jekyl Sound, Ga., improvement of waterway via----------------------                   438
Johnsons Bayou, La., improvement__  --------------------------------                  720
Johnsons Creek, or River, Conn., improvement-----------------------                    92
Jones Inlet, N. Y., review of reports----------------------------                     189
Jordan River, Miss., improvement-------------------------------                       591
Judith Point, R. I., construction of harbor of refuge ------------------              100

                                            K
Kahului Harbor, Hawaii, improvement--------------------------- 1404
Kalamazoo River, Mich., improvement__           ----------------------------          1079
Kampsville Lock and Dam, Illinois River, Ill.,               operating and care------ 864
Kanawha River, W. Va.:
    Improvement      ----------------------------------------------                    965
    Operating and care of locks and dams_------------------------                      972
Kansas City, Mo., engineering district_-----------------------------                   822
Kansas River, Kans. and Mo., examination-----------------------                        850
Kaunakakai Harbor, Hawaii, improvement------------------------                        1413
Kaw River, Kans. and Mo., examination---------------------------                       850
Kennebec River, Maine, improvement                      ---------------------           57
Kennebunk River, Maine, improvement-----------------------------                        57
Kenosha Harbor, Wis.:
    Improvement ----------------------------                                          1072
    Review of reports__-------------------------------------                     ---- 1105
Kentucky River, Ky., operating and care of locks and dams----------978
Keokuk (Des Moines Rapids) Canal and Dry Dock, Mississippi River,
  operating and care---              -----------------------------------               803
Kern River, Calif., review of reports---------------------------- 1296
Ketchikan Creek, Alaska, review of reports ------------------------ 1399
Ketchikan Harbor, Alaska, improvement                  -------------------------- 1398
Kewaunee Harbor, Wis., improvement ---------------------------- 1050
Keweenaw Waterway, Mich., improvement------------------------1012
Keyport Harbor, N. J., improvement------------------------------208
Keystone Lock, Bayou Teche, La., operating and care-----------------                   619
Key West, Fla.:
    Improvement of harbor at-----------------                                          493
     Review of reports on harbor----                                                  529
Kill Van Kull, N. Y., and N. J.:
     Examination and survey---_      __------------                                   2:19
     Improvement of Staten Island-New Jersey Channels ------------                    193
1562                                         INDEX
                                                                                                Page
Kings County, Wash., improvement of Lake Washington Canal by .....                              1378
Kiskiminitas River, Pa., examination and survey-------------------                                54
Kissimmee River, Fla.:
    Examination and survey__               ____-----              ------------------            529
    Improvement     ---------------------------------------------                               529
Knapps Narrows, Md., improvement____                   _____
Knight and Hendry Channel, Fla., improvement of Tampa Harbor .__
                                                                          -________________     278
                                                                                                511
Knobbs Creek, N. C., improvement__       ----......                         _____ ____--342
Kootenai River, Idaho and Mont.:
    Improvement---          ------------------------------------------                          1398
    Review of reports_         -______----------------                                      -   1399


Labatre Bayou, Ala., improvement-------                                                         578
Lafourche Bayou, La.:
    Improvement                                                                                  6-------------------
                                                                                                  48
    Review of reports                                                                             49
                                                                                                 6-------------------
La Grange Bayou, Fla.:
    Improvement     ---------------------------------------------                                591
     Review of reports- ---------------                   ----         ----                      592
La Grange Lock and Dam, Illinois River, Ill., operating and care--------        864
Lake Calumet, Ill., examination and survey--_-------------------                891
Lake, Champlain, N. Y. and Vt.:
    Burlington Harbor, Vt., improvement---.---             -
                                                         ______-  -- _____      186
    Narrows, improvement          --------------------------------------        183
    Plattsburg Harbor, N. Y., improvement-------------------------188
    Port Henry Harbor, N. Y., improvement ____.__________ ______                188
    Rouses Point, N. Y., improvement-----------------------------188
    Surveys and charting _____-_____--___                                  __1528
Lake Charles Deep Water Channel, La., improvement------------------643
Lake Mabel, Fla., improvement of Hollywood Harbor---______             ______   484
Lake of the Woods, Minn.:
    Regulation     of levels___ ---------------------------------------
         Reguation of-level      ___    ________                               1528
                                                                              12
    Surveys and charting                                                       1--------------------
Lake Memphremagog, investigation of levels by International Board --           1534
Lake Pontchartrain, La., improvement _______- __--________-____                 555
Lake River, Wash., improvement---------------------------------                1341
Lakes, Great :
    Channels in waters connecting, improvement___________________                  1106
    Control or regulation of waters of Niagara River and preservation
      of Niagara Falls            ---------------------------------------- 1534
    Discharge           ---------------------------------------------              1528
    Elevation                                                             --------  528
                                                                                   1--------------------
    Examination and survey of Miami and Erie Canal, branch canal to
      Lake Michigan and other routes between Lakes Erie and Michigan
      and the Ohio River             ---------------------------------------        954
    Review of reports on deeper waterway to Atlantic tidewaters -.. 1156, 1237
    Review of reports on deeper waterway to Hudson River------------1237
    Surveys, charts, etc.........                                                  1528
    Water levels       ---------------------------------------------               1530
Lake Washington Ship Canal, Wash.:
    Improvement of waterway to Puget Sound _____ _______-___- _ 1378
    Operating and care of waterway to Puget Sound_--- ____               ________ 1382
Lake Washington, Miss., improvement _______________                   __   _____    750
Lake Worth Inlet, Fla.:
    Examination and survey-------------------------------------                     530
    Improvement---------------------------------                                    482
La Lanche Bay, Ala., improvement of intracoastal waterway via---------              553
L'Anguille River, Ark., improvement                                                  61
                                                                                    7-------------------
La Trappe River, Md., improvement_____________________
                                                     --                        __   293
Lavaca Bay, Tex., improvement of channel from Pass Cavallo to Port
  Lavaca---      -------------------------------------------------                  702
Le Claire Canal, Iowa:
    Improvement -- - ----                       -       -------                                 782
    Operating and care------                           --      __---
                                                                - --            --      --      803
                                                 INDEX                                              1563
Leech Lake Reservoir, Minn.:                                                                         Page
      Construction--------             --------------------------------------                          814
     Operating and care-------__ ----------------------------------                                    817
Lee Slough, Apalachicola River, Fla., improvement__________________                                    535
Leipsic River, Del., improvement ----------                         ------------------                 272
Leland Harbor, Mich., review of reports----------------------------                                  1105
Levels, water. See Water levels.
Levisa Fork, Big Sandy River, Ky.:
     Examination                                               .____---_977
     Improvement ---           ------------------------------------------- 973
     Operating and care of locks and dams------------                             -------------        973
Lewis River, Wash.:
     Examination for flood control-------------------------------                                    1354
     Improvement               ---------------------------------                                     1343
Little Annemessex River, Md., improvement of Broad Creek, Md---------                                  293
Little Caillou Bayou, La.:
     Improvement                                                                                        10
                                                                                                       6-------------------
     Review of reports          ------------------------------------------                             649
Little Calumet River, Ill. and Ind., examination and survey------------891
Little Elk River, Md., improvement                 -------------------------------- 293
Little Kanawha River, W. Va., operating and care of locks and dams_...                                 962
Little Machipongo River, Va., improvement __                           -           ___-___ -
                                                                              -_____                   293
Little Narragansett Bay, R. I., and Conn., improvement ----------------                                100
Little Pigeon and French Broad Rivers, Tenn., improvement------------913
Little River, Del., improvement                                  ___---_-250
Little River, La., improvement                       _____________                                     750
Little River, Okla., examination with a view to control of floods --------                              70
Little River, S. C., improvement of waterway via--------------------                                   378
Little Sarasota Bay, Fla.:
     Improvement of Sarasota Bay--------------------------------510
     Review of reports__             ------------------------------------------                        530
Little Sodus Bay, N. Y., improvement of harbor______________________ 1223
Little Wicomico River, Va., review of reports------------------------312
Livingstone Channel, Detroit River, Mich., improvement __________                               -    1129
Locklies Creek, Va., improvement----           _         --------------------------- 312
Log booms, permits for construction-_----------------------------1515
Long Beach Harbor, Calif.:
     Improvement of channel to Los Angeles Harbor                                     ____ -         1...____
                                                                                                     1244
     Review of reports of harbor_                  __ _______-----_,--------                         1252
Long Cove, Maine, review of reports__-----                              ___-__________-__               58
Lookout Cape, N. C., improvement of harbor of refuge                                                   387
Lorain Harbor, Ohio:
     Improvement          ---------------------------------------------                              1166
     Review of reports--1----                  --------------------------------                        237
Los Angeles, Calif.:
     Engineering district                                                                            1---------------------
     Examination of harbor               ------------------------------------- 1252
     Improvement of harbor                   ________________________________                        1244
     Review of reports on harbor---_-- --                           --        ---          -___-_ 1252
Louisiana and Texas intracoastal waterway:
     Examination and survey from Corpus Christi to the Rio Grande
       Valley      -------------------------------------------------                                   722
     Improvement, Mississippi River to Corpus Christi                                             620, 657
     Review of reports          ------------------------------------------ 722
Louisiana, State of, removal of water hyacinths from-------------- 588, 645
Louisville and Portland Canal, Ky.:
     Enlargement------------------------------                                                         914
     Operating and care            ---------------------------------------- 925
Louisville, Ky., engineering district_____________________________                                     982
Lowell Creek, Alaska, flood control                     ---------------------                        1394
Lower Chipola River, Fla., improvement ---------------------------- 535
Lower Thoroughfare at or near Wenona, Deals Island, Md-                                  -             293
Ludington Harbor, Mich., improvement ---------------------------- 1093
Lynn Harbor, Mass.:
     Improvement                                     _______                                     -_______37
   Review of reports_ -       -_____- _______-
                                        -    --                                                         58
Lynns Bayou, Tex., review of reports-----------_,_-                                                    722
1564                                         INDEX

                                    M
Mabel Bay and Lake, Fla.:                                                                    Page
   Examination of waterway to Caloosahatche River______________                               529
   Improvement of Hollywood Harbor       ______________------------                           484
Machipongo (Great) Inlet to Hog Island, Va., examination and survey
  of channel-                                                                                 294
Machodoc (Upper) Creek, Va., improvement-----------------------                             312
Mackay Creek, N. C., improvement ------------------------------------ 350
Mackinac Harbor, Mich., improvement__                                               _     1156
Mackinac Island, Mich., to Round Island, Mich., channel, improvement_                     1116
Macon Bayou, La., improvement ____-____                     -               --
                                                                     - ________             734
Mahoning River. Pa. and Ohio, examination and survey_--------------- 954
Main ship channel, New York Harbor, N. Y., improvement---------------                       128
Malden River, Mass., improvement --...                                                       57
Mamaroneck Harbor, N. Y.:
    Improvement----                                                             -----        04
                                                                                            1-------------------
    Review of reports -----------------------------------------------                       189
Manasquan Inlet and River, N. J.:
    Improvement               ---------------------------------------------                 215
    Review of reports -----------------------------------------------                       219
Manatee River, Fla., improvement-------------------------------------                       529
Manchac Bayou, La.:
    Examination of waterway via____                  ______    ______________         620, 649
    Improvement                                                                             648
Manchac Pass, La.:
    Examination of waterway via                                                        20, 649
                                                                                      6-------------------------
    Improvement___------ -----                      ______                                  648
Manchester Harbor, Mass., improvement--------__.__- .. __...___                              57
Manhasset Bay, N. Y., improvement___________ ___ __ ______--__- --                          188
Manistee Harbor and River, Mich.:
    Examination of harbor __               ____-_-____             _____,_      -   _     1105
    Improvement--------------------                                                       1095
Manistique Harbor, Mich.:
    Improvement-------------------------___                                               1027
    Review of reports---------------------------------------------- 1105
Manitowoc Harbor, Wis.:
    Improvement------------------------------------                                       1054
    Review of reports ----------                 ___ -___________________                 1105
Manteo Bay, N. C., improvement___--___---------------                                       348
Mantua Creek, N. J., improvement----------------                       ___        -         261
Maps and charts, northern and northwestern lakes --- ___----------                        1529
Mare Island Strait, Calif., improvement _...__________--__------       --                 1264
Marquette Bay and Harbor, Mich.:
    Construction of harbor of refuge in bay                   _______-1015
    Improvement of harbor_--------- ----                                                  1017
Marthas Vineyard, Mass., improvement -------------------------------- 100
Matagorda Bay, Tex., review of reports on silt deposits in ______________                   722
Matanzas River, Fla., improvement of intracoastal waterway, Jacksonville
  to Miami, Fla., via ------------------------------------------------                      469
Matawan Creek, N. J., improvement----------------------------------- 210
Mattaponi River, Va.:
    Improvement-----------------------------------                                          307
    Review of reports-----------------------------------------------                        312
Mattituck Harbor, N. Y., improvement--------------------------------- 188
Mattox Creek, Va., review of reports_---------------------                                  312
Maumee Bay and River, Ohio, improvement of Toledo Harbor _____-____ 1150
Maurepas Lake, La., examination of waterway via- -______--____-___..                        649
Maurice River, N. J.:
    Examination and survey-__---                  -------         -----                     273
    Improvement_  ----------------------------------------------------                      266
Mayaguez Harbor, P. R., improvement--- ------                                        _- 1417
McClellanville, S. C., improvement of waterway to Charleston __--____-                      410
Meherrin River, N. C.:
    Improvement __----------------                                                          343
    Review of reports ___------------------------                                           353
Memphis Harbor, Tenn., improvement of Wolf River--                                          767
Memphis, Tenn., engineering district_------------------                                     751
                                         INDEX                                      1565
                                                                                 Page
Memphremagog Lake, Vt., operations of International Board for Investi-
  gation of Levels--------------------------------------------------             1534
Menominee Harbor and River, Mich. and Wis.:
    Improvement-------------------------------------------              ------- 1029
    Review of reports -----------------------------------------------            1105
Mermentau River, La.:
    Improvement, including tributaries __________________________                 637
    Improvement of intercoastal waterway                                          620
    Improvement of waterway to Sabine River______________________ __              620
                                              --
Merrimack River, Mass., improvement----_________-_                                  57
Miami and Erie Canal, Ohio, examination and survey ------------------             954
Miami (Great) River, Ohio, examination and survey_ _________-------_              981
Miami Harbor and River, Fla.:
    Improvement of harbor------------------------------------------               486
    Improvement of intercoastal waterway to Jacksonville, Fla           --------- 469
    Improvement of river-------------------------------------------               492
    Review of reports on harbor_ -------              __________---------         530
Mianus River, Conn., improvement__              ----------
                                                   ______        _                100
Michigan City Harbor, Ind.:
    Improvement_----------------------------------------------------              887
    Review of reports_-----------------------------------------              -- 891
Michigan, Lake:
    Canal to Sturgeon Bay, improvement _____-------__-              ----       - 1045
    Channels in waters connecting Great Lakes, improvement ---------- 1106
    Discharge -----------------------------------------                          1528
    Elevation __ _1--------------528
    Examination and survey of waterways to Ohio River_______ ____                 954
    Examination of waterway to Mississippi River---------------------1105
    Illinois and Mississippi Canal, operating and care ------------------         807
    Surveys, charts, etc--------------------------------------------             1528
    Water levels                                                                 1--------------------
Middle Neebish Channel, St. Marys River, Mich., improvement ----------- 1106
Middle River, Calif., improvement        _________--___                          1290
Milford Haven Harbor, Va., improvement__--                -____-______-- _        304
Milford Harbor, Conn., improvement____-- ___________ ________--__                   88
Mill Creek and South Slough, Ill., improvement______________---____               811
Mill Creek or River, Conn. :
    Improvement of New Haven Harbor______________________________                   84
    Improvement of Stamford Harbor -- __-__-__________________ -                    97
Mill Creek, Va., and channel to Rappahannock River, review of reports__           312
Milwaukee, Wis.:
    Engineering district -------------------------------------------- 1026
    Improvement of harbor -----------------------------------                    1064
    Review of reports on inner harbor__----------------           ______-__ -1106
Mingo Creek, S. C., improvement--------------------------------------             428
Minim Creek-Estherville Canal, S. C., improvement__________________               410
Mining, hydraulic, in California -------------------------------------- 1429
Minnesota River, Minn.:
    Examination and survey__----------------------------------                    822
    Improvement_.__ __-__--_____                                             _821
    Operating snag and dredge boats_---        ___________--_____--___            805
Miscellaneous civil works_____-------____-__
                            _.                                _-__ __            1515
                                                                             -_____
    General statement regarding_________          ____                                   7
Mispillion River, Del., improvement ----------------------------------- 254
Mississippi River:
    Examinations and surveys:
         Brainerd to Minneapolis, Minn--------------------------------822
         Head of Passes to headwaters (Mississippi River Commission)__ 1445
         Illinois and Mississippi Canal_______________                        8_____________
                                                                               13
         Minneapolis, Minn., in vicinity of__________________ _________-822
         Missouri River to Minneapolis, review of reports-------------813, 822
         New Orleans, La., review of reports on intracoastal waterway
            to Corpus Christi, Tex                                        49, 722
                                                                        6-------------------------
         New Orleans, La., to Apalachicola River, Fla., waterway_--------     592
         South Pass ------------------------------------------------          601
1566                                          INDEX

Mississippi River-Continued.
    Examinations and surveys-Continued.                                                      Page
         To intracoastal waterway__ ___ _________-------------                                649
         Waterway to Cumberland Sound, Ga___________--_--__--------                           454
         Waterway to intracoastal waterway via Bayou Manchac-------                           649
         Waterway to Lake Michigan__________________---------                          891, 1105
    Experiment station___ ----------------------------------------                          1452
    Flood control, emergency work on tributaries-------------------                         1445
     Gaging, including tributaries, at or near St. Paul, Minn_ ---------- 818
     Improvements:
         Baton Rouge to New Orleans, La                       ______                           02
                                                                                             6_____
         Cubits Gap to Head of Passes____________---------------------                        593
         Hastings Lock and Dam--___ __________---                                             782
         Head of Passes to Ohio River (Mississippi River Commission)__ 1445
         Illinois River to Minneapolis, Minn-------------------------                         782
         Le Claire Canal and Lock--------------------------------                             782
         Leech Lake and Mississippi River ----   _     ----------------------                 814
         Minneapolis to mouth of Wisconsin River ______----___----                            782
         Missouri River to Clarksville, Mo--------------------------                          782
         Missouri River to Minneapolis_________-------------------                            782
         Missouri River to Ohio River____ ___              _______-------------770
         New Orleans, La., to Corpus Christi, Tex., intracoastal water-
            way      --------------------------------------------                       620, 657
         Twin City Lock and Dam_     --------------------------------                         782
         Passes:
              Head of, to Ohio River________----- -------------------- 1445
              South Pass_---          ------------------------                                598
              Southwest Pass, including shoals between Cubits Gap and
                 Head of Passes          -----------------------------------                  593
         Reservoir dams at headwaters_______---------------------                             814
         Sabine River, waterway to______--------- -           --------------                  620
         Wisconsin River to Illinois River-----------------------                             782
     Levees, Head of Passes to Cape Girardeau, Mo------------------                         1490
     Mapping alluvial valley__          ____---------------------                           1471
     Operating and care:
         Hastings Lock and Dam          __-         __-------------------------803
         Illinois and Mississippi Canal ________--- -----------------                         807
         Keokuk Lock and Dam_           -------------------------------                       803
         Le Claire Canal, Iowa___----- __ ----------------------                              803
         Locks and dams above the Missouri River-______--                  -___-__-
                                                                                 -            803
         Moline, Ill., lock and dam at         ------------------------------                 803
         Reservoir dams at headwaters----------------------------817
         Snag and dredge boats above Missouri River----------------                           805
         Snag boats below Missouri River___                ___________        ____-   ___    778
         Twin City Lock and Dam-___----------- ----------------                               803
    Removing wrecks__-----------------------                                                1481
Mississippi River Commission:
    Flood protection by                                                                     1---___-------------
                                                                                            1445
    Improvement of Mississippi River by
    Report of President____----------------
                                                    _____   -
                                                            -       -
                                                                        -_______----__
                                                                           -
                                                                                          -1445
                                                                                            1466
Mississippi Sound, Miss. and Ala.:
    Gulfport Ship Island Channel and Ship Island Pass, improvement_-_                         582
    Improvement of channel to Mobile Bay _____                         -
                                                               _____------     -    -         555
Mississippi, State of, removal of water hyacinths from waters of .. - _ 588, 645
Mississippi Valley Flood Control, review of reports ________________649
Missouri River:
    Examinations and surveys-______            _______--__-__-___                     __      850
    Improvement :
         At Fort Peck, Mont------------------------------------                               841
         At Niobara, Nebr., and Yankton, S. Dak., flood control---------                      850
         Contributions from private agencies for-__________--__-___                           824
         General ------------------              ---------------------------                  823
         Hermann to the mouth                                                                  23
                                                                                              8-------------------
         Kansas City to mouth -823
        Kansas City to Sioux City----      ----------__                                           832
        Sioux City to Fort Benton__--   --        - - -                          -        -   -   839
Mobile, Ala., engineering district--  -  - -_ - -                                    --           530
                                                      INDEX                                                1567
Mobile Bay and Harbor, Ala.:                                                                                 Page
   Improvement of channel to Mississippi Sound ----------------------                                         555
   Improvement of harbor and bar________           _____________-      -__                                    563
   Improvement of intracoastal waterway to New Orleans, La                                    -----------     555
   Improvement of intracoastal waterway to Pensacola Bay, Fla-....                                            553
                       -----------------------------------------------
   Review of reports_________                                                                                 592
Mobile River, Ala., removing the water hyacinths in river and tributaries _                                   588
Mokelumne River, Calif.:
   Examination for flood control-______-                            _                                        1296
     Improvement        ________            ___            __1284
Moline Harbor, Ill.:
    Improvement of Mississippi River between Wisconsin River and Illi-
       nois River----------------------------------                                           -----           782
   Operating and care of lock                                                                                  03
                                                                                                              8-------------------
Monongahela River, W. Va. and Pa.:
    Examination for flood control                                   --------------                            954
    Improvement                                                                      _            --          936
   Operating and care of locks and dams___                                                                    940
   Review of reports            -                                                                             954
Monroe Bay and Creek, Va., improvement____________________________                                            312
Monroe Harbor, Mich.:
    Improvement _                                                                                            1147
    Review of reports-___                                                                                    1156
Monterey Harbor, Calif., improvement________________________                                                 1267
Morehead City Harbor, N. C., improvement                               :384
Mormon Channel, San Joaquin River, Calif., improvement______________ 1282
Morris Cove, New Haven Harbor, Conn., improvement                        84
Morristown Harbor, N. Y., improvement__-        __                    1236
Morro Bay, Calif., review of reports_______________________________   1252
Mount Hope Bay, Mass., improvement.__-_____-__-_________-_               66
Mount Sinai Harbor, N. Y., review of reports-______________________--189
Mouse River, N. Dak., examination for flood control____ _____________  822
Mud Lake, Mermentau River, La., improvement                              37
                                                                       6-------------------
Mulberry Creek, Va.:
    Improvement--------------------------------------------------      312
   Review of reports_       ________                                                                          312
Murderkill River, Del., improvement____________ _---                                                         -253
Muscle Shoals, Tennessee River, Ala.:
    Dam No. 2 (Wilson Dam), improvement and maintenance, including
      hydroelectric development____-______------__---------           -909,,911
    Operating and care of canal-------------------------------------- 907
    Operating and care of Lock and Dam No. 2 (Wilson Dam)                  907                  --------
Muskegon Harbor, Mich.:
    Improvement      -------------------------------------------------- 1086
    Review of reports----------------06----------------------------
Muskingum River, Ohio, operating and care of locks and dams ...        .   955
Muskingum River Valley Reservoirs, Ohio, construction                      9----------------95
Mystic River, Conn., improvement_---------------------                     100
                                                                           1-
Mystic River, Mass., improvement_ _______                                  _---------------                    57

                                                       N
Nandua Creek, Va., improvement_...______- ___-___-
                                     -__-__-                                                                 293
Nansemond River, Va., improvement_ ____________----_---                                                      352
Nantasket Beach Channel, Boston Harbor, Mass., improvement-..__                                                40
Nanticoke River (including Northwest Fork), Del. and Md., improvement__                                      :23
Nantucket Harbor and Sound, Mase.:
    Construction of harbor of refuge-------------------- -------------                                         61
    Improvement off:
          Cross Rip Shoals---------------------------------------------                                       62
          Pollock Rip Shoals----------- --------------------------------                                      59
    Review of reports on harbor                                                                               01
                                                                                                             1--------------------
Napa River, Calif., improvement---------------------------- ---------                                       1274
Naoragansett Bay, R. I., improvement ---------------------------------                                        69
Narrows of Lake Champlain, N. Y. and Vt., improvement ------------                                           183
Nashville, Tenn., engineering district    ---------------  --     ---                                        891
      91536--mNG 1934-99
1568                                               INDEX

                                                                                                         Page
Natalbany River, La., improvement__________________________             _____                             607
Navesink (North Branch of Shrewsbury) River, N. J., improvement ...                                       213
Navigable waters. See Bridges; Rivers and harbors; Wrecks; and
  Regulations.
Navigation, Congresses of, Permanent International Association -___--_                                   1512
Navigation, surveys for                                                                                  1--------------------
Nawiliwili Harbor, Hawaii, improvement -----------------------                                           1408
Neah Bay, Wash., examination and survey-----------------------                                           1399
Neches River, Tex.:
    Improvement of Sabine-Neches Canal____________------- -650            ___
    Review of reports on Sabine Neches waterway, Tex                          _                            22
                                                                                                          7____________
Neebish Channels, St. Marys River, Mich., improvement---------------                                     1106
Nehalem Bay, Oreg., improvement ______-___________________                                               1354
Neponset River, Mass.:
    Improvement     ----------------------------------------------                                         57
    Review of reports   ------------------------------------------.                                        58
Nezpique Bayou, La., improvement .___._________________-           _____                                  637
Neuse River, N. C.:
    Examination and survey_____------     ____             _______  __--_                                 402
    Improvement___ ---------------------------------                -------                               362
Newark Bay., N. J., improvement_      __________--______ -                   __                           190
New Bedford Harbor, Mass.:
    Improvement----------      ------------------------------                                              64
    Review of reports   ------------------------------------------                                        101
Newburyport Harbor, Mass., improvement____________________________                                         57
New Hampshire coast, examination between Rye Beach and Fox Head
  Point-                                                                                                    58
New Haven Harbor, Conn., improvement by dredging, etc_                                                       84
New Jersey and New York Channels:
                                    --
   Examination and survey-_------------------------                                                         219
   Improvement__--_,___-_____                                                    -193
New Jersey-Staten Island Channels, N. Y. and N. J., improvement ---                                     __ 193
New London Harbor, Conn.:
    Improvement     ------------------                                                           ---         75
   Review of reports--          ---------------------------------------- 101
New Orleans, La.:
   Engineering district---          -----------              -------------------------                      592
    Examination and survey of waterway to the Apalachicola River, Fla_                                      592
    Improvement of intracoastal waterway in Louisiana and Texas, ex-
      tending to Corpus Christi, Tex_________--___----------------                                     620, 657
    Improvement of intracoastal waterway to Mobile Bay, Ala-------- 555
    Inprovement of Mississippi River to Baton Rouge, La____________                                         602
    Review of reports on intracoastal waterway to Corpus Christi, Tex_                                      649
Newport Bay, Calif.:
    Improvement__ -------------------
                         _         __                _                                                    1241
   Review of reports         ---------------------------------                                        -- 1252
Newport Harbor, R. I., improvement______________________----_                                               100
Newport News, Va., improvement of channels to _________________---320
Newport River, N. C., improvement of waterway between Beaufort and
  New River---      ------ ---------------------------------------                                          375
New River, Fla.:
    Improvement of intracoastal waterway, Jacksonville to Miami, Fla.,
      via__----------------------------------------------------                                             469
   Review of reports                   ------------------------------                              ----     529
New River, N. C.:
   Examination and survey-----------------------------------402
   Improvement-----           -----------------------------------------                                     375
   Improvement of waterway to Swansboro and Beaufort______________                                          375
New Rochelle Harbor, N. Y., improvement-- ___- __                                    ____-____--            105
Newtown Creek, N. Y., improvement-----------------------------                                              152
New York and New Jersey Channels:
   Examination and survey------------------------------------                                               219
    Improvement            -----------------------------------                                              19
New York Bay and Harbor, N. Y.:
   Ambrose Channel, improvement_-   -_                            - -       __---                         128
   Anchorage Channel, improvement____                                                                     128
                                              INDEX                                            1569
New York Bay and Harbor, N. Y.-Continued.                                                    Page
   Arthur Kill, improvement -----------------------------------                               198
   Battery, the removal of shoal in Hudson River off Pier A----------                         157
   Bay Ridge Channel, improvement -----------------------------                               134
   Bayside Channel, improvement ____--                   ___-------------__                   128
   Bronx River, improvement ------------------ -- --------------                              107
   Buttermilk Channel, improvement _________________________                                  139
    Channel, Staten Island-Hoffman and Swinburne Islands-----------                           128
    Coenties Reef, removal-- ----__________                  _          _-----__ -       -    144
   Coney Island Channel, improvement ----------------------------                             133
   Craven Shoal, improvement--                   -         --
                                                       - __________---__                      128
   Drift, collection and removal                           ___________                   65, 1517
                                                                                       1______
   East (Ambrose) Channel, improvement ______________________                        __       128
   East Chester Creek, improvement                                         -___        -
                                                                                      __-     1___________-
                                                                                             188
   East River, N. Y.:
        Improvement, including Coenties Reef-----------------------                           144
        Review of reports ---------------------------------------                             189
   Examination and surveys_____________________ __-__-__                                 189, 219
   Flushing Bay, improvement _________ -___                         -_                         109
   Gedney Channel, improvement- -                   --
                                                   __________________________                 128
    Gowanus Creek Channel, improvement_                  ___- ---        ---- __       __-143
   Great Kills, Staten Island, improvement--                          - -
                                                                _______--     - __       _- 202
    Harlem River, improvement ______________________                       -    ___            155
    Hell Gate, East River, improvement_ ____-._______________-                           -     144
    Hudson River Channel, improvement________________________- -                              157
    Hutchinson River (East Chester Creek), improvement___ __-- -__                             188
    Intracoastal waterway to Delaware River, examination and survey__                          219
   Kill Van Kull, improvement___________________________                                      193
    Main Ship Channel, improvement-----------------------------                               128
   Narrows to the sea, improvement __                     __________--             -______- 128
    New Jersey-Staten Island Channels, improvement _-                          -- __-
                                                                            ____-              193
   Newtown Creek, N. Y., improvement_                 _______-----------__-                    152
    North (Hudson) River, improvement_ ....                        ____   ___-______ -         174
    Oil pollution, New York Harbor________--_                                                1517
    Red Hook Channel, improvement________ ___                                                  18134
    Shooters Island Channel, improvement_                     -
                                                              ______ --   ___-__-___ -         193
    Staten Island-Hoffman Island-Swinburne Island Channel------------                          128
    Staten Island-New Jersey Channels, improvement ____- _______                         _     193
    Staten Island Sound, improvement ________-___-___-            -        -        -_____ 193
    Supervision, to prevent destructive or injurious deposits----------1517
New York engineering districts:
    First                                                                                       01
                                                                                               1-------------------
    Second -------------------------------------                                           - 189
New York State canals, surveys and charting of natural navigable
  waters      ----------------------------------------------------                           1529
Nezpique Bayou, La., improvement-                   -    -     -    -      -    -     -    -     637
Niagara Falls:
    Preservation of Falls and permits for water-power diversions -- ___                         1534
    Supervision for the Federal Power Commission-________ -            ___                      1514
    Supervision of power companies ________                        -__
                                                          -__________-   _-                     1534
Niagara River, N. Y.:
    Black Rock Channel and Tonawanda Harbor, improvement----------                              1206
                                    --------------------------------
    Buffalo Harbor, improvement_______                                                           199
    Control and regulation of water of, and preservation of the Falls....                       1534
    Improvement      ---------------------------------------------                              1212
    Supervision of power companies at the Falls--------------------                             1534
    Surveys, etc _______ ____________________ -         -___-1534
Nicaraguan Canal, survey-___________________                                                    1513
Nicolet Lake (Hay Lake) Channel, St. Marys River, Mich., improve-
  ments      ----------------------------------------------------                               1106
Nitrate plants, Muscle Shoals, Tennessee River----------------------                             909
Nolin River, Ky., improvement of Green River, Ky_                      __                        982
Nome Harbor, Alaska:
    Improvement -_____      -                                                                   1390
   Review of reports                                                                            1399
Nomini Creek, Va., improvement_ ----------                                                       312
Nooksack River., Wash., examinations ....                                                       1399
1570                                                  INDEX

Norfolk Harbor, Va.:                                                                                                  Page
    Examinations and surveys------ ----------------------------------                                                  353
    General improvement, including main channel of Elizabeth River
      and portions of southern, eastern, and western branches ----------                                               313
    Improvement of channels to Newport News                --                                                          320
    Improvement of Scotts Creek, Va__ _ _                                   -              ---                ----     313
    Improvement of Thimble Shoal__                                        _----          -------          -318
    Improvement of waterway to Beaufort Inlet ---------------------                                                    334
    Improvement of waterway to sounds of North Carolina (to Pamlico
       Sound)   via Pasquotank                 River                                                     .....--
                                                                                                          -      --    331
    Operating and care of waterways to Beaufort Inlet, N. C. -------     339
    Review of reports --------------------------                         353
Norfolk, Va., engineering district-------------------------------------  313
North Carolina sounds :
    Examination and survey of waterway to Norfolk, Va                    353
    Improvement of waterway to Norfolk, Va--------------------------331
Northeast River, N. C., improvement----------------------------------    396
North Edisto River, S. C., improvement of waterway via---                425
Northern and northwestern lakes:
    Channels in waters connecting Great Lakes, improvement----------    1106
    Discharge                                        ______________________                                           1528
    Elevation_-                                                   -       -              -                            1528
    Surveys, charts, etc-                                     _       -              _                                1528
    Water levels.   -------------------                                                                               1531
North Fork, Canadian River, Tex. and Okla., examination with a view
to control of the floods --------------------------------------------                                                 770
North (Hudson) River, N. Y., improvement----------------------------                                                   174
Norwalk Harbor, Cann., improvement                                                  -----------                         95
Norwich Harbor, Conn., improvement of Thames River         _,                                                           77
                               ------------------------------------
Noyo River, Calif., improvement_                                                                                      1269



Oak Bay to Port Townsend Bay, Wash., waterway, improvement-_---                                                       1398
Oakland Harbor, Calif.:
    Improvement                                          --                                       ---------           1257
    Review of reports__            ---------------                                                                    1275
Obion River, Tenn., review of reports ------------                                                                     770
Occohannock Creek, Va., improvement                                           ------------                             293
Occoquan Creek, Va., improvement-----------------------------------300
Ocean City Inlet, Md., improvement-- --------------------------------     288
Ocmulgee River, Ga.:
    Examination and survey -----------------------------------------      454
    Improvement---------------------------------------------------        441
Oconee River, Ga.:
    Examination and survey-----------------------------------------454
    Improvement ---------------------------------------------------       441
Oconto Harbor, Wis.:
    Improvement       -----------------------------------------------    1105
    Review of reports---------------------------------------------        106
Offatts Bayou, Tex., examination and survey ----------------------------  722
Ogdensburg Harbor, N. Y., improvement ------------------------------ 1231
Ogeechee River, Ga., examination and survey--------------------------     454
Ogunquit Harbor, Maine, examination ---------------------------------      58
Ohio River :
    Dashields Dam, Pa.:
         Construction ------------------------------------------------    914
         Operating and care-------------__-----------------------------   925
    Emsworth Dam, Pa., operating and care--------------------------       925
    Examinations and surveys of waterways to Lakes Erie and Michi-
       gan                  ---------------------------------                                                          954
    Examination and survey of Miami and Erie Canal, etc------------                                                    954
    Falls at Louisville, Ky., improvement at--------------------------                                                 914
    General improvement (open-channel work) -----------------                                                          927
    Locks and dams, construction____-       ---------                                                                  914
    Locks and dams, operating and care_----------------------                                                          925
                                             INDEX                                            1571
Ohio River-Continued.                                                                       Page
    Louisville and Portland Canal, Ky., enlargement______ -----------                         914
    Louisville and Portland Canal, Ky., operating and care------------ 925
    Montgomery Island Dam, construction_________________________-------------------           914
    Snag boats, operation--------------------------------------                               934
Okeechobee Lake drainage areas:
    Improvement ------------                       ------------------------------             496
    Review of reports --              ----------------------------------------                529
Oklawaha River, Fla.:
    Improvement            __-_____                                      __--                 465
    Operating and care of lock and dam at Moss Bluff, Fla-----------                          468
    Review of reports on waterway to Kissimmee__________-----------_                          530
Oldmans Creek, N. J., improvement___                         _____________________------------272
Old River, Fla. and Ala., improvement of intercoastal waterway via __-                        553
Old River (present mouth of Red River), La., removing snags and
  wrecks---------------------------------------                                               778
Old River, Wash., improvement_ ---------------------------------                            1383
Olympia Harbor, Wash.:
    Improvement -----------------------------------------                                -- 1369
    Review of reports_____________ ----------------------------------------- 1399
Omaha, Nebr., engineering district______ __--______-            ---------                     822
Onancock River, Va., improvement ________                       _________-              -__ 293
Ontario Lake:
    Channels in waters connecting Great Lakes, improvement----------1106
    Discharge            -----------------------------------------------                      528
    Improvement of St. Lawrence River to Ogdensburg, N. Y --------- 1230
    Surveys, charts, etceeeee        _1528                       ._eeeeeeeeeeeeeeeeeeeeeeee
     Water levels            --------------------------------------------                   15,28
Ontonagon Harbor and River, Mich., improvement-___ ___-------_10,10
Orange River, Fla., improvement______________________________--                               529
Osage River, Mo.:
    Improvement             ----------------------------------------------                     846
    Operating and care of lock and dam_____________________________                           847
Oswego Harbor, N. Y.:
     Improvement                                                                            1--------------------
    Review     of
          Review    reports_.....___
               of-report                      ... __.
                                   -----------------------------------------        ...      1237
                                                                                            13
Otter Creek, Vt.:
    Improvement--------                          ----------------------------------            188
Ouachita River, Ark. and La.:
     Improvement-         ----                                                       -    _     728
    Operating and care of locks and dams-------------------------                               732
    Review of reports      ---------------------------------------                              750
Oyster, Va., examination and survey of channel to Atlantic Ocean....                            294
                                                 P
Pagan River, Va., improvement ----------------------------------                        330
Paint Rock River, Ala., examination for flood control-....______----                    914
Pamlico River, N. C., improvement ____________________                    _---__        357
Pamlico Sound, N. C.:
    Improvement of waterway to Beaufort Harbor -_________                    ____---    372
    Improvement of waterway to Beaufort Inlet_____ _                  ____________      334
    Improvement of waterway to Norfolk, Va____________-_____---                         331
Pamunkey River, Va., improvement_                   __          ____----------------- 309
Panama Canal, survey__________
                          --              _________________                            1513
Pascagoula Harbor and River, Miss.:
    Improvement of harbor______________          -----------              __         _- 580
    Improvement of river above mouth of Dog River_________________                      591
Pasquotank River, Va., improvement of waterway via________________                      331
Passaic River, N. J., improvement             --------------------------                190
Pass Cavallo, Tex., improvement of channel to Port Lavaca____________                   702
Pass Manchac, La.:
    Examination of waterway via________________________________ 620, 649
    Improvement --------
                   _         --------------------------------------                     648
Patapsco River, Md., improvement of Baltimore Harbor and Channels__ 274
                                     _
Patuxent River, Md., improvement-..---        - - -      - --      - 312
1572                                            INDEX

Pawcatuck River, R. I. and Conn.:                                                   Page
    Improvement                                         ______-----------------------------------
                                                                                     100
    Review of reports-------------__    ---------------------------- 101
Pawtucket (Seekonk) River, R. I., improvement-.......                                  71
Peace River and Creek, Fla., improvement of creek______
                                                 ------                     ___-508
Pearl River, Miss.:
    Examination and survey ________________________--___                             592
    Improvement of East Pearl River ___________-________ -                -          591
Peconic River, N. Y., improvement --------------------------------                   188
Peedee, Great, River, S. C., improvement__________----_______ _                      408
Peekskill Harbor, N. Y., improvement------------------------------                   169
Penobscot River, Maine, improvement     ---------------------------                    57
Pensacola Bay and Harbor, Fla.:
    Examinations and surveys ---------------------                                   592
    Improvement of harbor____________--    __________-      __________               549
    Improvement of intracoastal waterway from bay to Mobile Bay, Ala_                553
Pensaukee Harbor, Wis., review of reports-------------------------1106
Pentwater Harbor, Mich.:
     Improvement ____-- _            __----_-                       ---------                1091
     Review of reports----              ----------------------------------                    1106
Perdido Bay, Fla. and Ala., improvement of intracoastal waterway via__                         553
Pere Marquette Lake, Ludington Harbor, Mich., improvement----------1093
Perkins Cove, Maine, examination--------------------------------- 58
Permanent International Association of Congresses of Navigation -------                       151.2
Permits :
     For construction of bridges -----------------                                            1----515
     For diversion of water from Niagara River, N. Y_________ ______                          1534
     For private structures and operations in navigable waters                  ---------     1515
Perquimans River, N. C., improvement____-_________________                                     352
Petaluma Creek, Calif.:
     Improvement ---------------------------------------------                                 274
     Review of reports------------                                                            1275
Petersburg, Va., improvement of Appomattox River ____________--__                              328
Petit Anse Bayou, La., improvement_________________---_                                        635
Petoskey Harbor, Mich., improvement __                    -          ___-----------1105
Philadelphia, Pa.:
     Engineering district---------------------------------------                               219
     Improvement of Delaware River at_______________________ 220, 226, 234
Pierhead lines, establishment           ----------------------------------- 1515
Piers, permits for construction               ______________                              -   1515
Pigeon Bayous, La., improvement ____                     ____           -      -    -   -      611
Pigeon (Little) and French Broad Rivers, Tenn., improvement                     ----------     913
Pine Bluff, Ark., improvement of Arkansas River at_---______                                   751
Pine River Reservoir, Minn.:
     Construction---------                 ------------------------                            814
     Operation and care_____---------------------------------------                            817
Pithlachascotee River, Fla., review of reports _____--.-------------                           530
Pittsburgh, Pa., engineering district-------------------------------                           935
Plaquemine Bayou, La.:
     Improvement of intracoastal waterway via_______--------------                             620
     Operating and care of lock and dam in _______________________                             618
     Review of reports6------------------------------------------                               49
Plaquemine Brule Bayou, La., improvement ________-_____________                                648
Plattsburg Harbor, N. Y., improvement __- ______-               -         __.... ________      188
Plymouth Harbor, Mass., improvement -----------------------------                               46
Pocomoke River, Md.:
     Examination and survey _____-__-_-                   ______-     ______-                  294
     Improvement---         ------------------------------------------- 293
Point Austin Harbor, Mich., examination and survey_-----------                                1156
Point Isabel, Tex.:
     Examination and survey of waterway to Corpus Christi, Tex
     Improvement of Brazos Island Harbor__------------------
                                                                                 --------      722
                                                                                            -  710
Point Judith, R. I., harbor of refuge, improvement------------------- 100
Point Lookout, Mich., examination and survey- ---------                                      1156
Pokegama Reservoir, Minn.:
    Cohitruction_ _._--_---------_-----------                                                 814
    Operating and care ---------------        -------                                         817
                                                  INDEX                                        1573
                                                                                                Page
Pollock Rip Channel, Mass., improvement                ------------------------              59
Pollution of navigable waters, New York Harbor-------------------1517
Poison Bay, Flathead Lake, Mont., improvement                     ------------------- 1398
Ponce Harbor, P. R., improvement------------------                                       1424
Ponchatoula River, La., improvement of Tickfaw River                                       607
Pontchartrain Lake, La.:
     Examination and survey of waterway via__ ________________----649
     Improvement_________________.                                                         555
                                                                                     -_________
Poquonock River, Conn., improvement--             ------------------------                   92
Portage Canal, Wis., examination of waterway via                                          1105
Portage Creek, Ala., improvement of intracoastal waterway via--------                      553
Portage Lake harbor of refuge, Mich., improvement_________---------                      1098
Port Alexander, Alaska, improvement_________--              ____-__----------            1398
Port Allen, Hawaii, improvement at_____________________---------1410
Port Aransas, Tex.:
     Improvement      ---------------------------------------------                        703
     Improvement of Harbor Island Basin-------------------------- 703
     Review of reports    -----------------------------------------                        721
Port Arthur Canal, Tex.:
     Improvement        -------------------------------------------                        650
     Review of reports       -------------------------------------                         722
Port Bolivar, Tex., improvement of channel to --------------------                         676
Port Chester Harbor, N. Y., improvement                        ____      ___________       1_____--
                                                                                           102
Port Clinton Harbor, Ohio, improvement -------------------------                          1156
Port Everglades, Fla.:
    Improvement-------          --------------------------------------                      484
     Review of reports                ----          __--      -       -------                      529
Port Gamble Harbor, Wash., improvement                          -----------        1398
Port Henry Harbor, N. Y., improvement---------------------------188
Port Huron, Mich., improvement of Black River at__________________ 1143
Port Jefferson Harbor, N. Y., improvement ______                  _______-  _____-  188
Portland and Louisville Canal, Ky.:
    Enlargement    ----------------------------------------------                   914
    Operating, and care----------------------------------------925
Portland Harbor, Maine:
    Examination along the water front of South Portland------------                  58
     Improvement __               -------------      _                                              31
Portland, Oreg., engineering district__________-_____--_-_-_____-__                    1296
Port Lavaca, Tex., improvement of channel to Pass Cavallo ------------                   02
Port Orford Harbor, Oreg., examination and survey-----------------1354
Port series reports-----------------------------_                                        28
Portsmouth Harbor, N. H., improvement _______--------------------                        57
Port Townsend Bay to Oak Bay, Wash., waterway improvement ----                       _ 1398
Port ,Washington Harbor, Wis., improvement_____--------------------                    1060
Port Watsonville Harbor, Calif., review of reports ------------------                  1275
Port Wing Harbor, Wis., improvement------------                          ---------     1026
Potomac River:
    Improvement at Alexandria, Va_________----___________                           __  297
    Improvement at Washington, D. C___--------                      ____________ ___    295
    Improvement below Washington, D. C-------------------------298
    Review of reports    ------------------------------------------                     312
Power companies at Niagara Falls, N. Y., supervision of_____________ 1534
Power, water :
                                                               ---
    Niagara River, N. Y., control and regulation_______________________                1534
    Surveys for         ---------------------------------                              1424
Presque Isle Harbor, Marquette, Mich., improvement__________________ 1015
Presque Isle Peninsula, Erie, Pa., improvement-                   - -1194
Private structures and operations in navigable waters, permits for                     -----    1515
Providence Harbor and River, R. I.:
     Improvement -----------                               -------                   ----           69
     Improvement of Pawtucket (Seekonk) River_____________________                                 71
     Removal of Green Jacket Shoal ____________________________
Providence, R. I., engineering district____ -- --   --                          -_
                                                                                               - 58
                                                                                                   69
Provincetown Harbor, Mass., improvement- --                                                      57
Public Works program, works included to October 15, 1934--_                           ----     - 5
1574                                        INDEX

Puerto Rico:                                                            Page
     Construction of roads and bridges--------------------------------  1420
     Engineering district_--------------------------------------------_ 1415
     Improvement of San Juan Harbor--------------------------------1415
     Reclamation of swamp areas-------------------------------------    1422
Puget Sound, Wash.:
     Improvement of, and tributaries.__                                 1368
     Improvement of Lake Washington Canal----------------               1378
     Operating and care of Lake Washington Canal                        1382
     Review of reports-------------------------------------             1398
Pultneyville Harbor, N. Y., improvement___                              1219
Pungo River, N. C., improvement of Bellhaven Harbor__                    355
Pungoteague Creek, Va., review of reports-----------------------------   294
Purchase or condemnation of easements, Lake of the Woods, Warroad
  River, and Rainy River             ---------------------------------- 1534
Purification of water supply at Washington, D. C--                      1524
Puyallup River, Wash., improvement of Tacoma Harbor--                   1372

                                                Q
Quantities of work done----------------------------------------------    4
Queenstown Harbor, Md., improvement ----                               293
Queue de Tortue Bayou, La., improvemen-_                               648
Quillayute River, Wash., improvement----------------------            1366
Quinby Creek, Va., review of reports_-                                      --              294
Quinnipiac River, New Haven, Conn., improvement                                              84

                                      R
Raccoon Creek, N. J., improvement -------------                                             272
Racine Harbor, Wis.:
    Improvement --------------------------------------------------                         1070
    Review of reports ----------------------------------------------                       1106
Rahway River, N. J.:
     Improvement                           -------------------                              218
    Examination and survey--                                              219
Rainy Lake reference, investigations for International Joint Commission_ 1540
Rainy River, survey operations----------------------------------1528, 1541
Raisin River, Mich., improvement of Monroe Harbor                     _  1147
Rappahannock River, Va., improvement--------------------------------      301
Raritan Bay and River, N. J.:
    Examination and survey of channel to Arthur Kill--                    219
    Improvement of channel to Arthur Kill----------------------------198
    Improvement of bay---------------------------------------------193
    Improvement of river -_                                                                 203
    Review of reports       ---------------------------------------           219
Red Hook Channel, New York Harbor, N. Y., improvement --------------          134
Red River, La., Ark., Tex., and Okla.:
    Cypress Bayou and lakes to Jefferson, Tex., improvement           --- 726-
                                                                       750, 1511
    Ex4minations and surveys-----------------------------------
    Improvement below Fulton, Ark_----------------------------------         '723
    Improvement from Fulton, Ark., to mouth of Washita River, Okla___         750
                                                                _
    Jefferson-Shreveport waterway improvement -------------------             726
    Rectification of mouth by Mississippi River Commission_         -       1445
Redwood Creek, Calif., improvement _______-________                         1274.
Regulations and rules:
   For anchorage grounds__________________                                  1515
   For navigable waters                                        ------       1--------------------
                                                                            1515
    For opening of drawbridges                                              1515
Rehoboth Bay, Del., waterway to Delaware Bay:
    Improvement               ----------                                                    272
    Review of reports             ----------------------------------                        273
Reservoirs:
    Mississippi River headwaters:
        Construction------                                                                   814
        Operating and care __---_---   -    -      -                   --        -   -   -817
    Tidal Reservoir, Potomac River, D. C-----------__                                        295
    Washington Aqueduct, D. C----        --                                                 1524
Richelieu River, soundings and topography---                                                1528
                                                           INDEX                                      1575
Richmond Harbor, Calif.:                                                                               Page
    Improvement --- __                       _----------                                              1261
    Review of reports--_ -____----
                                --------      __-________                                             1275
Richmond Harbor, Va., improvement of James River---- ----------                                        321
Rigolets, the, La., examination                                                                        649
Rio Grande, Tex., flood control -------------                                                          720
Rivers and harbors:
     Abandonment and curtailment of projects---                              --                        1515
     Advanced funds for improvement of                                                                    9
     Allotments under War Department Appropriation Act of Feb. 23,
       1931 ____       __--------                                       --                               15
    Allotments under War Department Appropriation Act of July 14,
      1932         ____   ___ __                                    __                                   15
    .Allotments under Emergency Relief and Construction Act of July 21,
       1932_          __
                       -       _, -__
                                   -                                                   --                17
     Allotments under War Department Appropriation                                Act of Mar. 4,
        1933        ____        -__ _                              --                                    18
    Allotments and transfers under War Department Appropriation Act
        of Apr. 26, 1934 ------------------------------------------------                                22
     Appropriations for operations during the past year ---   -                                           8
     Board of engineers for__                                                                            27
    Bridges, construction and alteration__                                                             1515
     Bridges, regulations for opening of draws                                                         1515
    'Contributed funds for improvement of ___11
     Estimate of appropriations for-....                                                                27
     Expenditures during the past year_                                                                 10
     HIarbor lines, establishment--------------------------------------                               1516
     Public Works program on Oct. 15, 1933                                                               5
     Regulations for establishment of anchorage grounds         _                                     1515
     Regulations for opening of drawbridges____                                                       1515
     :Structures other than bridges, permits for erection       _                                     1515
     Works included in Public Works program to Oct. 15, 1933.........                                    5
Roanoke River, N. C., improvement --------                                                              344
Rochester (Charlotte) Harbor, N. Y., improvement__                                                     1216
Rockhole Creek and Herring Bay, Md., improvement__                                                      293
Rock Island, Ill., engineering district --                                                              805
Rockland Harbor, Maine, improvement                                                                      57
Rockport Harbor, Mass., improvement -                                                                    57
Rockport, Tex., review of reports                                                                       721
Rock River, Ill. and Wis.:
     Examinations and surveys--                                                                         813
    Illinois and Mississippi Canal, operating and care                  807
    Operating snag boats and dredge boats-----------------------------805
Rondout Harbor, N. Y., improvement_                                     171
Root River, Wis., improvement of Racine Harbor-.....                   1070
Rouge River, Mich.:
    Improvement               ----------------                         1145
     Review    of reports-------------------------------                                -----          1156
Rough River, Ky., operating and care of lock and dam__________________                                  990
Round Island, Mich., to Mackinac Island, Mich., channel, improvement__                                 1116
Round Lake, Charlevoix, Mich., improvement---------------------------                                  1102
Rouses Point, Lake Champlain, N. Y., improvement--------------------                                    188
Royal River, Maine, examination in vicinity of------------------------                                   58
Rules and'regulations :
    For anchorage grounds------------------------------------------                                    1515
    For opening of drawbridges--------------------------------------                                   1515
Russell Creek, S. C., examination and survey--------------------------                                  428
Rye Beach and Fox Head Point, examination of coast of New Hamp-
  shire between-----------------------------------------------------                                     58
Rye Harbor, N. H., examination -- -------------------------------------                                  58

                                                             S
Sabine-Neches Canal, Tex.:
    Contributions for improvement                             ---------------------------               652
    Improvement-                                                                                        6------------------
    Review of reports---------------------                                                      ---     722
1576                                               INDEX

Sabine River, La. and Tex.:                                                       Page
    Improvement of intracoastal waterway to Corpus Christi, Tex .--...             657
    Improvement of intracoastal waterway to New Orleans, La________                620
                                               _
    Improvement of Sabine-Neches Canal_________---   ---------                     650
    Improvement of Sabine Pass Harbor6---------------                               50
    Improvement of waterway to Calcasieu River, La------------      --    620
    Improvement of waterway to Mermentau River, La                        620
    Review of reports-------------------------------------      ------    722
Sackets Harbor, N. Y.:
    Improvement---------------------------------------------------       1236
    Review of reports                                                    1237
Saco River, Maine:
    Improvement     -----------------------------------------------         57
    Review of reports -------------------------------------------          58
Sacramento,.Calif., engineering district-------------------------------1275
Sacramento River, Calif.:
    Flood control by California Debris Commission-                       1435
    Hydraulic mining----------------------------                -------           1429
    Improvement ---------------------------------------------- 1286, 1435
    Removal of debris by California Debris Commission ________--___-  1435
    Review of reports----------------------------------------------   1296
Sag Channel, Ill., examination and survey---------------------------891
Sag Harbor, N. Y.:
    Improvement-------
    Review of reports---
                             -----------------------------------
                              --------------------------------------- 189
                                                                                   188
Saginaw River, Mich.:
     Improvement---        --------------------------------------         1139
     Review of reports_____________           ___________________         1156
St. Andrews Bay, Fla.:
     Improvement of bay         ---------------------------------------- 541
     Improvement of channel to Apalachicola River                          539
St. Augustine Harbor, Fla., review of reports________                      5______5______
                                                                            30.
St. Clair Flats Canal, Lake, and River, Mich.:
     Gages ---------------------------------------------------------       531
     Improvement of channels in Lake St. Clair__--      --------------    1123
     Improvement of channels in waters connecting the Great Lakes ...     1106
     Improvement of St. Clair River------------------------------1117
St. Croix River, Maine, and New Brunswick, operations of International
  Board of Control      -------------------------------------------       1534
St. Croix River, Maine, improvement        -------------------------        57
St. Croix River, Wis. and Minn.:
     Improvement--      --------------------------------------------       819
     Operating snag boats and dredge boats------------------------805
St. Denis Bayou, La., improvement_________________________609
St. Francis River, Ark., improvement____--     __                          761
St. Jerome Creek, Md., improvement-- __ __          ___________        -_  312
St. Johns River, Fla.:
     Examinations and surveys       ----------------------------------     530
     Improvement between Jacksonville and Palatka, including Orange
       Mills Flats and Deep Creek---------------------------------529
     Improvement between Palatka and Lake Harney_,----------____           462
     Improvement of intracoastal waterway, Jacksonville to Miami, via__    460
     Improvement, Jacksonville to the ocean_                               457
     Improvement of waterway to Beaufort, S. C-----------------438, 455
     Improvement of waterway to Cumberland Sound-----------                455
     Review of reports on waterway to Indian River-------------------530
     Review of reports, Jacksonville to Palatka----------------------530
St. Jones River, Del., improvement___________------______                  251
St. Joseph Harbor and River, Mich.:
     Improvement of harbor--------------_                                 1074
     Improvement of river       -----------------------------------       1105
    Review of reports _ _                   -   -----------                       110.6
St. Josephs Bay, Fla., improvement of entrance                -----------------    5--
                                                                                  '91
St. Lawrence River:
     Board of control to control the operation of the St. Lawrence Power
      Co., near Massena, N. Y                                                     1535
    Improvement between Ogdensburg, N. Y., and Lake Ontario-- - --                1230
    Review of reports on waterway to the Great Lakes                              1237
                                                INDEX                                             1577
                                                                                                     Page
St. Louis, Mo., engineering district                                                                  7-------------------
                                                                                                       70
St. Lucie Canal, Inlet, and River, Fla.:
     Improvement of canal and river                                                                  496
     Improvement of inlet-----      ----------------------------------                               529
St. Marks River, Fla., improvement_                                                                  591
St. Marys River and St. Marys Falls Canal, Mich.:
     Channels and waters connecting the Great Lakes, improvement ---                                1106
     Improvement of river at the falls, including Hay Lake (Nicolet
       Lake) and Neebish Channels           ---------------------                                   1106
     Operating and care of canal     --------------------------------                               1114
      Surveys,     etc                                                                               528
                                                                                                    1------------------
St. Marys River, Ga. and Fla.:
     Examination and survey of waterway to proposed Gulf intra-
       coastal waterway              ----------------------------------------                       454
     Improvement                      ---------------------------------------                       450
St. Paul, Minn.:
     Engineering district ------------------------------                                            814
     Gaging Mississippi River at-------                      --------------------------- 818
St. Petersburg Harbor, Fla.:
     Improvement ----------------------------------------------                                     518
     Review of reports---------------------------------                                             530
Salem Harbor, Mass., improvement---------------------------------                                     57
Salem River, N. J., improvement----------------------------------262
Saline River, Ark., improvement --                                                               _-750
Saline River, Ill., review of reports --------------------------------                              993
Salliers Bay, N. C., examination and survey of waterway via------------ 402
Salmon Bay, Wash.:
     Improvement of Lake Washington Canal                                            ___--         1378
     Operating and care of Lake Washington Canal ....                                              1382
Salmon Creek, N. Y., improvement of Pultneyville Harbor-----------__                               1219
Salmon River, Alaska, flood control _                      _            ---------- _               1396
Sampit River, S. C., improvement of Georgetown Harbor---------------                                  78
San Antonio Bay, Tex., channel in, examination and survey------------- 722
San Carlos Bay, Fla., examination and survey of channel in-------------                             530
San Diego Harbor, Calif:
     Examination and survey-------------------------                                          --   1252
     Improvement ------------------------------------------                                         237
Sandusky Harbor, Ohio, improvement_---                                                             1157
Sandy Hook, N. J., examination and survey------------------------219
Sandy Lake Reservoir, Minn.:
     Construction     _____---------                                                                814
     Operation and care--------------------------------------                                       817
San Francisco Bay and Harbor, Calif.:
     Improvement of harbor                ------------------------------------                     1252
     Improvement of Oakland Harbor------------------------------ 1257
San Francisco, Calif., engineering district                                                        1252
San Jacinto River, Tex., improvement of waterway via-----------------678
San Joaquin River, Calif.:
     Hydraulic mining            -----------------------------------------                         1429
     Improvement-------------------------------                                                    1276
     Improvement of Stockton and Mormon Channels----------------- 1282
     Review of reports---------------                         --             ---------------- 1296
    Work of California Debris Commission                                                           1--------------------
San Juan Harbor, P. R.:
     Improvement-        -----------         --------------------                                  1415
     Review of reports--------------                      ----------              ---------------- 1424
San Leandro Bay, Oakland Harbor, Calif., improvement---------------1257
San Luis Obispo Harbor, Calif., improvement------------------------ 1250
San Pablo Bay, Calif., improvement ------------------------------ 1264
San Rafael Creek, Calif., improvement-----------------------------_                                1274
Santa Bar ra lHabor, Calif., review of reports---------------------125.
Santa Cruz Harbor, Calif., review of reports-----------------------1275
Santa Monica Harbor, Calif., review of reports--
                                              .....                                                 1252
Santa Rosa, Fla., improvement of narrows in sound-                                                   545
Santee River; S. C., improvement-------------__                                                      428
Sapelo Harbor, Ga-------------------- ---------------                                                454
1578                                     INDEX

Sarasota Bay, Fla.:                                                        Page
     Improvement_----------------------------------------------------_      510
     Review of reports-----------------------------------------------530
Satilla River, Ga., improvement ....-_____---_______                   ___  449
Saugatuck Harbor, Mich., improvement                                       1079
Saugatuck River, Conn., improvement --------------------------------- 100
Saugerties Harbor, N. Y., improvement----------------------                 173
Saugus River, Mass.:
     Improvement of Lynn Harbor_                                                         37
     Review of reports_        ----------------------------------                   58
Savannah, Ga., engineering district_--------               __----------        __  428
.Savannah Harbor and River, Ga.:
     Examinations and surveys_---______ -------------------                        454
     Improvement of harbor___------------------------------------------            429
     Improvement of river above Augusta____________________________                454
     Improvemenit of river at Augusta=                                             454
     Improvement of river below Augusta__                 _____         _________  433
     Improvement of waterway to Beaufort, S. C________---__ ______-                438
      Improvement of waterway to Fernandina, Fla _________                         438
Saxman Harbor, Alaska, review of reports__      ____________                     1399
:Saybrook Harbor, Connecticut River, Conn., improvement ____________                79
:Schooner Bayou, La., operating and care of lock------------------                 632
Schuylkill River, Pa., improvement                                                 236
Scituate Harbor, Mass.:
     Improvement __        ____                                                     57
     Review of reports--------------------------------------------                  58
Scott Point, Tennessee River, Ala., lock and dam at Hales Bar, operat-
   ing and care-----------------------------------                                 907
Scotts Creek, Va., improvement of Norfolk Harbor______________________            313
Scuppernong River, N. C.:
     Improvement----------------------------------------------------346
     Review of reports--                                                           353
                                                                                   3-------------------
Seattle Harbor, Wash., improvement of Duwamish River and east and
   west waterways------------------------       -----------------------           1376
Seattle, Wash., engineering district _________-__________________                1355
Sebewaing Harbor and River, Mich., review of reports ____________                      1156
Seddon Island Channel, Fla., improvement of Tampa Harbor                                 11
                                                                                        5------------
Seekonk (Pawtucket) River, R. I., improvement ------------------------                   71
Seward, Alaska :
    Construction of harbor of refuge_ _______-___-     --- _________--                 1389
     Review of reports_                    _-----------                                1399
Shallotte River, N. C., improvement__________ ______________                            402
Shallowbag Bay, N. C., improvement ----------------------------------                   348
Shark River, N. J., review of reports                     -------------                 219
Shaws Cove, New London, Conn., improvement _______________--
                                                           -    -    -___ -    75
Sheboygan Harbor, Wis.:
      Improvement                                                           1--------------------
      Review of reports     ------------------------------------------      1106
Sheepshead Bay, N. Y., improvement___ ________________________              188
Sheffield Island Harbor, Conn., improvement of Norwalk Harbor               --------
                                                                              95
'Shell Reef Channel, N. Y., improvement---------------------------           144
Shem Creek, S. C., examination and survey___________________________        428
Shenango River, Pa., examination and survey                                 954
Ship Island Harbor and Pass, Miss., improvement of pass and channel
   to Gulfport_ -------------------------------------------------------      582
Shipyard River, S. C.:
      Improvement --------------------------------------------------         423
      Review of reports----------------------------------------------        428
shoal   Harbor, N. J., improvement -------------------------------------     211
Shooters Island Channel, N. Y. and N. J.:
      Examination and survey-----------------------------------------        219
     Improvement                                                                        193
Shreveport, La., to Jefferson, Tex., improvement of waterway              ----------    726
Shrewsbury River, N. J.:
    Improvement ---------------------------------------
                  __                                                                    213
    Review of reports-------------------                                                219
                                      INDEX                                           1579
                                                                                       Page
Siletz River, bar and entrance, Oreg., review of reports-----------
Silver Lake Harbor, N. C----------------___     ----------------------
                                                                             ----     1354
                                                                                       361
Silver Springs Run, Fla., improvement----------------------------                      465
Sinepuxent Bay, Md., improvement ___________________----____                           288
Sinslaw River, Oreg.:
                    --
    Improvement ___________--                                                         1354
    Review of reports------------------------------------------                        1354
Skagit River, Wash.:
    Examination for flood control-              -               --                     1399
    Improvement __ ______   ___-______------                                          139'8
Skamokawa Creek, Wash., improvement_                                                  1347
Skamokawa Slough, Wash., improvement ________- ______-___----                         1354
Skipanon Channel, Oreg., improvement .....-                                     _--    1316
Skykomish River, Wash., examination for flood control-----------------1399
Slack-water systems. See Canals and Waterways.
Slaughter Creek, Md., improvement-------------------------------        293
Smith Creek, Md., improvement     ----------------------------------    312
Smiths Creek, N. C., improvement                           -----        402
Smith River, Oreg., examination and survey________________ _____-      1354
Smith Creek, N. J., examination .---.--                                                 219
Smyrna River, Del., improvement-------------------------------                          248
Snake River, Idaho, Oreg., and Wash.:
    Improvement _____                                                                  1354
    Review of reports ---------------------                                            1355
Snohomish River, Wash.:
    Examinations-------------------------------                                        1399
    Improvement   --------------------------                                           1383
    Improvement of Puget Sound and tributaries---------------------                    1368
Snoqualmie River, Wash.:
    Examination for flood control-----------------------------------                   1399
    Improvement of Puget Sound and tributaries              --------                  1368
Socastee Creek, S. C., improvement of waterway via--------------------           378
Soda Lake, La., improvement of waterway via                    ----------------  726
South Chicago Harbor, Ill., improvement_ ___8______________-__----.              875
South Creek, N. C., review of reports______________________-___-- _         --   402
South Edisto River, S. C., examination__------------------------                 428
Southern Branch, Elizabeth River, Va.:
    Examination and survey-----------------------------------------              353
    Improvement of Norfolk Harbor_             -         -________---_,-         313
South Haven Harbor, Mich.:
    Improvement       --------------------------------------------------        1077
    Review of reports----------------------------------------------1106
South Pass, Mississippi River:
    Examination and surveys----------------------------------------              601
    Maintenance of channel-----------------------------------------              598
Southport Harbor, Conn.:
    Improvement ---------------------------------------------------              100
    Review of reports-----------------------------------------------101
South River, N. C., improvement_                                                 360
South River, N. J., improvement --------------------------------------           206
South Slough and Mill Creek, Ill., improvement_______________________            811
Southwest Pass, Mississippi River, improvement, including shoals between
  Cubits Gap and Head of Passes, and dredge construction--------------           593
Sparkill Creek, N. Y., examination and survey_______________________             189
Sparkman Bay Channel, Fla., improvement of Tampa Harbor_
Spring Garden, Baltimore, Md., improvement of harbor at
                                                                       ---.......511
                                                                                 274
Squalicum Creek, improvement of Bellingham Harbor, Wash............ 1385
Stamford Harbor, Conn.:
    Improvement ----------------------------------------------------              97
    Review of reports _______           ___-          ___101
Staten Island-New Jersey Channels, improvement-------------                      193
Staten Island Sound (Arthur Kill), N. Y. and N. J., improvement-------           193
Steamboat Slough, Wash., improvement_                                                  1354
Steele Bayou, Miss.:
     Examination and survey------------_                     ___       ---              750)
    Improvement_                   _ __ _ _                 __                          750
1580                                              INDEX

                                                                                                          Page
Steinhatchee River, Fla., review of reports                          ____-------------------              530
Stilaguamish River, Wash., examination for flood control------------ 1399
Stillwater Harbor, Minn., improvement of St. Croix River _______-                                 -       819
Stockton Channel, San Joaquin River, Calif., improvement---_______--                                     1282
Stonington Harbor, Conn., improvement ________                                      ___      _______      100
Stono River, S. C., improvement of waterway via__ ____________---_425
Structures in navigable waters, permits for private structures and opera-
  tions _1------------------                                                                              515
Sturgeon Bay and Lake Michigan Ship Canal, Wis.:
     Improvement             -------------------------                               ---                 1045
     Review of reports- -_______-------------                                                       --   1106
Suisun Bay Channel, Calif., improvement ___------ ----------                                             1292
Suisun Channel, Calif., improvement_________________------------                                         1294
Sunflower River (Big), Miss.:
     Examination and survey                              -------------------                              750
     Improvement--- -----------------                            -------------------                       744
     Operating and care of lock and dam__---------------46
Sunken craft, removal of--------------------                                 ------------------ 1515
Superior-Duluth Harbor, Wis., improvement________________________                                          999
Superior Lake:
     Board of control---- -------                      -----------------------------                     1535
     Channels in waters connecting Great Lakes, improvements___---                                     _ 1106
     Discharge-------------                   -------------------------------------                      1528
     Elevation---                            ------------------------------------                         528
                                                                                                         1---------
     Surveys, charts, etc-------------------                                                              528
                                                                                                         1-------------------
     Water levels                                                ---              --          ---        1528
                                                                                                         1-----------------
Supervision of New York Harbor, N. Y., to prevent destructive or in-
  jurious deposits            --------------------------------------------                               1517
Surface levels. 'ee, Water levels.
Surveys:
     General statement regarding----------------------------------                                            7
     International boundary waters_                        ___         ______________________-1529
     Navigation, flood control, power, and irrigation ----__-___-__                                      1424
      Of northern and northwestern lakes _______________________                                         1528
Susquehanna River, Pa. and Md.:
     Improvement above and below Havre de Grace, Md.                                                       293
     Review of reports ---------                         --------------        ___          ------         294
Suwannee River, Fla., improvement-------                                  ____                         _   529
Swan Quarter Bay, N. C., improvement of waterway from Deep Bay,
  N. C., to Bay          -----------------------------------------------                                   354
Swansboro, N. C., waterway to New River and Beaufort, improvement__                                        375
Swift Creek, N. C., improvement--____-----            .________                      __________           364
Swinomish Slough, Wash., improvement _____-____--                               __       ______ ___ 1398

                                                      T
Tacoma Harbor, Wash., improvement           __________________________                                   1372
Tallahatchie River, Miss., improvement                                                                    750
Tampa Bay and Harbor, Fla.:
    Improvement ..             __                                                                          511
     Improvement of channel to Clearwater Harbor _______________                                           520
    Improvement of Hillsboro Bay and River ___________________                                             511
Tangier Channel, Va.:
    Improvement---------          ----------------------------------                                       285
     Review of reports    ---------------                           -----                                  294
Tangier Sound, Va.:
     Examination and survey                ______________________                                          294
     Review of reports on waterway to Chesapeake Bay via Ewell, Md___                                      294
Tangipahoa River, La., improvement        ____________________________                                     606
Tar Bay, Md., review of reports _____________________________________                                      294
Tar River, N. C.:
     Improvement ...... ______         __                                                                  357
     Review of reports                              ---------                                              402
Tarrytown Harbor, N. Y., improvement- --                                                            _..167
Taunton River, Mass., improvement_ --         ---                           --       ---            -_   67
Taylor Creek, Fla., improvement _____-----------_--                                                 -   496
                                              INDEX                                            1581
Teche Bayou, La.:                                                                             Page
     Improvement._---           ___-__.._______-615
                                          --
      Operating and care of Keystone Lock_______________________                         __    619
      Operating and care of waterway to Mississippi River, Harvey Canals_                      629
Tennessee River :
      Above Chattanooga, improvement____________________________                               898
      Below Riverton, Ala., improvement__--______                                              898
      Chattanooga to Riverton, improvement_..__-____________                    -       _ -898
      Colbert Shoals Canal, operating and care_.____----__-__-__-                              907
      Dam No. 2, Muscle Shoals, improvement and maintenance, including
        hydroelectrical development_-             -__--__            ______--------       909, 911
      Dam No. 2, Muscle Shoals, operating and care____________--_______                        907
      Dam No. 2 to Florence Bridge, Ala.:
          Improvement of Dam No. 1--------------------------------898
          Operating and care of Dam No. 1__---------------------------                         907
      Examination and survey-- ---------             __      -        ___      - _ _-          592
                                                                -898
      General Joe Wheeler Dam, improvement ____________________--
      Hales Bar Lock and Dam, operating and care____________--______                           907
      Muscle Shoals Canal, operating and care_ -____---                         -____-______   907
     Muscle Shoals nitrate plant_- -----       __        -----------_____
     Widows Bar Lock and Dam, operating and care -- _-------907
                                                                                  ___   __-    909

Tensas River, La., improvement -----------------------------------                             734
Terre au Boeuf Bayou and Delacroix Island, La., review of reports------                        649
Terrebonne Bayou, La., improvement -------------------------------                             648
Texas and Louisiana intracoastal waterway:
     Examination, Corpus Christi to the Rio Grande Valley -----                           _    722
     Improvement, Mississippi River to Corpus Christi __________-620, 657
     Review of reports          ---------------------------------------                        722
Texas City Harbor, Tex.:
     Improvement of channel to Galveston                                                        72
                                                                                               6-------------------
     Review of reports on channel to Galveston_______---               ____----_               722
Texas, State of, removal of water hyacinths from waters of__                              588, 645
Thames River, Conn.:
     Improvement-----------------------------------------------77
     Review of reports           ----------------------------------------- 101
Thimble Shoal, Chesapeake Bay, Va., improvement ________________318
Thomaston Harbor, Maine, improvement_ ---     _-         ----           -    -      -__         30
Thoroughfare Bay with Cedar Bay, N. C., channel connecting, improve-
  ment       ------------------------------------------------------                            369
Thunder Bay Harbor and River, Mich., improvement------------------                           1137
Tickfaw River, La., improvement of, including tributaries __----------- 607
Tigre Bayou, La., improvement______-------- --------                                           635
Tilghman Island Harbor, Md., improvement __-..             ___-__-- --..-                 __   293
Tillamook Bay, Bar, and entrance, Oreg.:
     Improvement of bay and bar                                                              1__---------------
                                                                                             1311
     Review of reports           -----------------------------------------                   1355
Tohopekaliga Lake, Fla., review of reports --------------------------                          530
Toledo Harbor, Ohio, improvement -----            -----                -1150
Tombigbee River, Ala., and Miss.:
     Demopolis, Ala., improvement below (construction of locks and dams)                       568
     Demopolis, Ala., to Walkers Bridge, Miss., improvement-...------                       - 575
     Operating and care of locks and dams- -           ----------------------                  577
     Review of reports     ------------------------------------------                          592
Toms River, N. J., improvement___----________--------------                                    272
Tonawanda Harbor, N. Y., improvement-__-_-                         -      -       -__ __-1206
Tongass Narrows, Alaska, review of reports-----------------------                            1399
Towboats, experimental, for use on Mississippi River -----------------                         782
Tradewater River, Ky., improvement-----------------------------                                993
Tred Avon River, Md., improvement------------------------------293
Trent River, N. C., improvement- -----------------                                             367
Trinidad Bay, Calif., examination and survey----------------------1275
Trinity River, Tex. :
     Examination and surveys_________--    --                  __--
                                                                  -----      __-     --
                                                                                     ___       722
                       ---
     Improvement ____-----------------                                                -        720
     Improvement of mouth______---------          -          _                                   720
     Review of reports_______---------                                           -_              722
1582                                     INDEX

                                                                                         Page.
Troy Lock and Dam, Hudson River, N. Y., operating and care                 -----------
                                                                              182:
Tuckahoe River, Md., improvement-----------------------_                      293.
Tuckerton Creek, N. J., improvement _______-_______----- --           __      272:
Tug Fork, Big Sandy River, W. Va. and Ky.:
    Examination and survey ------------------------------------               977
    Improvement---      ---- --------------------------------------           973
    Operating and care of locks and dams         -------------------------- 973:
Turners Cut, N. C., improvement of waterways via__________ _____---331
Turtle Bayou, Tex.:
    Examination and survey---              __--_--_-
                                     _---__--                                 722
    Improvement      --------------------------------------- ------ 720
Turtle Cove, Tex., improvement of waterway via--___ -______-            __--  700,
Turtle River, Brunswick Harbor, Ga., improvement ---------------- __          444
Twelvemile Bayou, La., improvement of waterway via-----------------           726:
Twin City Lock and Dam, Mississippi River:
       Improvement----------------------------------------------78782'
    Improvement
    Operating and care ______________-----------__                            803:
Twin Rivers, Wis., improvement of Two Rivers Harbor ____________-1052
Twitch Cove, Md., improvement                                                 284
Two Rivers Harbor, Wis.:
    Improvement                                 ....
                                             ______...___________            1052:
     Review of reports _--                    ------------------                         1106
Tyaskin Creek, Md., improvement _.___________________--------                             293
Tygart River Dam, W. Va., construction ---------                                          951

                                               U
Umpqua River, Oreg.:
    Examination and survey _______________-                       _____ ___-____ 1355
    Improvement     ---------------------------------------------                1304
Union Lake, Wash., improvement of waterways via _____________-_                  1378,
Union River, Maine, improvement                   -------------------------------- 57
Upper Chipola River, Fla., improvement____________________---------------------   538,
Upper Machodoc Creek, Va., improvement-------------------------                   312
Upper Thoroughfare, Deals Island, Md., improvement_________-----------------      282
Upper White River, Ark., operation of locks and dams_______________--764
Urbanna Creek, Va., improvement________________________--                         303"

                                             V
Ventura Harbor, Calif., review of reports________________------------                    1252,
Verdigris River, Okla., examination with a view to control of the, floodS__               770
Vermilion Bay and River, La., improvement___      _____________________                   636
Improvement of intercoastal waterway via________________________                          620)
Vermilion Bayou, La., improvement ____________---__-
                                                  -        --                             636,
Vermilion Harbor, Ohio, improvement-___ ___-__            ___         _____              1236
Vermilion Lock, La., operating and care ------------------------- _                       634
Vicksburg, Miss., engineering district-----------------------------                       723;
Vineyard Haven Harbor, Mass., improvement --------------              ----                100.
Virginia coast waterway improvement___            ______________                          293.


Wabash River, Ind. and Ill.:
    Improvement___                        _        _ _----------------------------------
                                                                 ------------           993:
    Operating and care of lock and dam at Grand Rapids_,_...----              _         993
Waccamaw River, N. C. and S. C.:
    Improvement of river__ --------------------------------------                        406'
    Improvement of waterway via_________________             __T--------_               378
Waddington Harbor, N. Y., improvement--------------------------___                    1236
Wadmelaw River, S. C., improvement of waterway via
Waldo, Fla., review of reports on canal to Little Lake Santa Fe
Wallabout Channel, N. Y., improvement _______________________                  ___
                                                                                   -     425
                                                                                         530
                                                                                         188
Wappinger Creek, N. Y., improvement_______________________                               170
Wappoo Cut, S. C., improvement____ __-_ ---                        -----       -     _    425
Warren River, R. I., improvement ..................-                                      100.
                                                     INDEX                                     1583
Warrior River, Ala.:                                                                            Page
   Improvement       ----------------------------------------------                              568
   Operating and care of locks and dams on Black Warrior River ..--.                             577
   Review of reports----------------------------------------                                     592
Warroad Harbor and River, Minn., improvement ______________         ___                         1022
Warwick River, Md., improvement -------------------------------                                  293
Washington Bayou and Lake, Miss., improvement----                                               750
Washington Canal, N. J., improvement------------ --------------                                   206
Washington, D. C.:
   Anacostia Park--      ----------            -----------------------------                      520
   Anacostia River, reclamation of flats -------------------------- 1520
   Aqueduct, increasing water supply- ----                ----------------                 1524, 1527
   Aqueduct, maintenance and repair-                     -__
                                                  __-- -------------------                       1524
   Engineering district-----------              ----------------------------                      294
   Government buildings, consumption of water in__                        ____     ___-----1524
   Improvement of Potomac River at----------------------------                                    295
Washington Lake, Miss., improvement                __---__-------                                 750
Washington Lake, Wash.:
   Improvement of waterway to Puget Sound-___ __------                           --------        1378
   Operating and care of waterway to Puget Sound-________---                                     1382
Water consumption :
   District of Columbia-----_----------- -----------------------                                 1524
    Government buildings, District of Columbia----------- -------                                1524
Water hyacinths, removal of, from Florida, Alabama, Mississippi, Louisi-
ana, and Texas waters-------------------------------                                 526, 588, 645
Water levels:
   Mississippi River and principal tributaries, gaging ______-----                    -__         818
   Northern and northwestern lakes, levels, etc---------------                                   1531
Water power:
   Investigations for Federal Power Commission ___                         ____--___ 1514
   Niagara River, N. Y., control and regulation of--------------1514, 1535
    Surveys for---- ---------------------------------------                                      1424
   Tennessee River, Wilson (no. 2) Dam -------------------------- 909
Waters, navigable. See Bridges, Rivers and harbors, and Wrecks.
Water supply, Washington, D. C-----------------------                          --                1524
Waterways:
   See also Canals.
   Apalachicola River to St. Andrews Bay, Fla., improvement ------- _                             539
   Beaufort, N. C.:
        Improvement of waterway to Cape Fear River, including water-
          way to Jacksonville, N. C-----------------                        --------          --  375
        Improvement of waterway to Pamlico Sound via Core Sound___                                372
        Improvement of waterway to New River--------------------                                  375
   Beaufort, S. C., to St. Johns River, Fla., improvement --------- 438, 455
   Beaufort to Jacksonville, N. C., improvement                      - __-     ______- 375
   Cape Cod Canal, Mass., improvement_____--                      --           ___       ___--     48
   Cape Fear River, N. C., to Winyah Bay, S. C., improvement -----                       __       378
   Charleston, S. C.:
        Improvement of waterway to Beaufort ___-------___--                                       425
        Improvement of waterway to Winyah Bay____ __ --- ---- __                                  410
   Chesapeake Bay to Delaware River, Del. and Md. (Chesapeake and
      Delaware Canal) :
        Improvement--      ----------------------------------------                               242
        Operating and care of canal and locks ----                             _______            247
   Chesapeake Bay to Tangier Sound, via Ewell, Md., review of reports_                            294
   Clearwater Harbor to Tampa Bay, Fla., improvement_-----------_                                 520
   Core Sound to Beaufort Harbor, N. C., improvement-------------- 372
   Corpus Christi to Point Isabel, Tex., examination-----------------                             722
   Cumberland Sound, Ga. and Fla., to Mississippi River, survey------ 454
   Delaware Bay, Del.:
        Waterway to Chincoteague Bay, Va., improvement------------ .257
        Waterway to Rehoboth Bay, Del.:
                Improvement-----------------------                 ---       ---           -    272
               Review of reports-...........                                                    273
     Erie Harbor, Pa., to Ohio River, via French Creek and Allegheny
       River, examination and survey---
                                     ..                                                         954
       91536-ENo 1934-100
1584                                      INDEX

Waterways-Continued.                                                   Page
   Florida (northern), examination and survey of waterways across, to
     connect the Atlantic intracoastal waterway with the proposed Gulf
     intracoastal waterway-------------------------------------         454
   Galveston to Houston, Tex., improvement-----------------------678
   Georgia (southern), examination and survey of waterways across, to
     connect the Atlantic intracoastal waterway with the proposed Gulf
       intracoastal   waterway                      ---------------                      454
    Great Lakes-Atlantic tidewaters deeper waterway, review of re-
      ports--------------             ------------------------------                1156, 1237
    Great Lakes to Hudson River deeper waterway, review of reports__ 1237
    Hylebos Waterway, Tacoma Harbor, Wash., improvement ---------                         1372
    Interoceanic Canal, survey ----------                                                 1513
    Jacksonville, Fla., to Miami, Fla., improvement__________________                      469
    Jefferson, Tex., to, Shreveport, La., improvement of waterway-------                   726
    Keweenaw Bay to Lake Superior, Mich., improvement--                        ________ 101.2
    Lakes Erie and Michigan to the Ohio River, examination and survey
      of waterways from_ ---------------------------------------                           954
    Lake Michigan to Mississippi River, examination of waterway___. 891, 1105
    Louisiana and Texas intracoastal waterway:
         Examination, Corpus Christi to the Rio Grande Valley             ---------        722
         Improvement, Mississippi River to Corpus Christi----------620, 657
         Review of reports__--_____----------                                              722
    Mackinac Island, Mich., to Round Island, Mich., improvement---___                     1116
    Miami and Erie Canal, Ohio, and branch canal to Lake Michigan,
       and other routes between Lakes Erie and Michigan and the Ohio
      River, examination and survey ______ -___------___                              _    954
    Mississippi River, La., improvement of intracoastal waterway to
       Corpus Christi, Tex        ----------------------------------- 620, 657
    Mississippi River to intracoastal waterway via Bayou Manchac, ex-
       amination     ----------------------------------------------                        649
    Mississippi River to Sabine River, La. and Tex_------------------                      620
    Mobile Bay, Ala.:
         Improvement of waterway to New Orleans, La                                        555
         Review of reports on waterway to Pensacola, Fla _______-_____                     592
    New Orleans, La., to Apalachicola River, Fla., examination and
      survey-------------              ------------------------------------                592
    New River, N. C., to Swansboro and Beaufort, improvement--------                       375
    New York and New Jersey Channels, improvement_ ----------                         _    193
    Norfolk, Va., to Beaufort Inlet, N. C.:
         Improvement ------------------------------------------
                                                        __                                 334
         Operating and care___________ _____________________                      ___      339
         Review of reports --------------------------------------- 353
         Norfolk, Va., to sounds of North Carolina:
             Improvement ---------------------------------------                           331
             Examination and survey                  ________------____----353
    Oklawaha River to Kissimmee River, Fla., through Lake Tohopeka-
      liga and Lake Apopka, review of reports ---------------------- 530
    Pamlico Sound, N. C.:
        Improvement of waterway to Beaufort Harbor----------------                        372
        Improvement of waterway to Beaufort Inlet_________                       __-      334
    Pensacola Bay, Fla., to Mobile Bay, Ala., improvement-----------                      553
    Port Townsend Bay to Oak Bay, Wash., improvement -------------                       1398
    Puget Sound to Lake Washington:
         Improvement        -----------------------------------------                   1378
        Operating and care-----            --------------------------------             1382
    Sabine-Neches waterway, Tex.:
        Contributions for improvement -----------------------------                       652
        Improvement------------- ------------------------------                           650
        Review of reports         --------------------------------------                  722
    St. Mary's River, Fla., to proposed Gulf intracoastal waterway, exam-
      ination and survey--------------------------------------                            454
    Savannah, Ga., to Beaufort, S. C., improvement_----------                             438
    Savannah, Ga., to Fernandina, Fla., improvement -----------                         - 438
    Skipanon Channel, Oreg., improvement -_--__1_----------                             1316
    Swan Quarter Bay to Deep Bay, N. C., improvement-- ......                            354
                                                  INDEX                                               1585
Waterways-Continued.                                                                                       Page
    Texas and Louisiana intracoastal waterway, Corpus Christi, Tex.,
      to the Mississippi River, improvement-----------------                                           620, 657
    Virginia coast waterway, improvement-------------------------                                           293
Waukegan Harbor, Ill., improvement _--__---867
Weirs, permits for construction---------------     _...-----                                              1515
Westchester Creek, N. Y., improvement-----------------------------106
Western Branch, Elizabeth River, Va., improvement__---- ----                                                313
West Creek, N. J., review of reports __-__---------------__                                                 273
West (Hay) Harbor, Fishers Island, N. Y., improvement ------                                         -__- 100
                                                                                                     __
Westport Harbor, Conn., improvement _____-___                                . -___...                      100
West River, Conn., improvement_---------_--                                                                   84
Weymouth Back River, Mass., improvement_----                     ------              --      -- __ -- 57
Weymouth Fore River, Mass., improvement_-------------__-----...                                               57
Wharves, permits for construction- -..                        __        _____--------__                   1516
Whatcom (Bellingham) Harbor, Wash., improvement of Whatcom Creek
waterway       -------------------------------------------------                                          1385
Whitehall Harbor, N. Y., Narrows to Lake Champlain, improvement---                                          183
White Lake Harbor, Mich.:
    Improvement        ---------------------------------------------                                       1089
    Review of reports-----------                      ----------------------------                         1106
White River, Ark.:
    Improvement by open-channel work_-__-......._____                             _               -
                                                                                           _-------         754
    Operating and care of locks and dams_-                             ----
                                                                    ____                -           --
                                                                                            -________       764
Wickford Harbor, R. I-------------------------                                ----------------              100
Wicomico River, Md., improvement _______-------_                                                            281
Widows Bar Lock and Dam, Tennessee River, operating and care                               -------          907
Willamette River, Oreg.:
    Examinations and surveys                                                                 __            1------____-__-
                                                                                                       _- 1354
    Improvement above Portland                     ___--                                                   1327
    Improvement below Portland_                     ___            ____----------------__                  1318
    Operating and care of canal and locks at Willamette Falls---------- 1331
    Review of reports___- _______-___-__-                      -     -      --      -     -    -       - 1354
Willapa Harbor and River, Wash.:
    Improvement ---------------                      ----------------------------- 1356
    Review of reports          ---------------            ------------------------- 1399
Willoughby Channel, Va., improvement ----------------------------                                           352
Wilmington Harbor, Del.:
     Improvement      ----------------------------------------------                                        239
    Review of reports----           ------------------------------------                                    273
Wilmington, N. C., engineering district-----------------------------353
Wilson (No. 2) Dam, Muscle Shoals, Tennessee River, Ala.:
    Improvement and maintenance, including hydroelectrical develop-
       ment      -----------------------------------------------                                      909, 911
    Operating and care-----------------------------------------                                             907
Wilson Harbor, N. Y., examination and survey ------ _____- ----                                        _ 1237
Winnebago Lake, Wis., improvement of Fox River- __-_______                                       ____ 1037
Winnibigoshish Reservoir, Minn.:
    Construction-------------------------                    --------------------------- 814
    Operating and care         -----------------------------------------                                    817
Winthrop Beach, review of report on Boston Harbor, Mass-----------                                            58
Winthrops Cove, New London, Conn., improvement ______________..                   .                           75
Winyah Bay, S. C.:
    Improvement       ----------------------------------------------                                        403
    Improvement of waterway to Cape Fear River, N. C _____________                                          378
    Improvement of waterway to Charleston________ __________-_                                              410
Wisconsin River, Wis., examination and survey of waterway via------- 1105
Withlacoochee  River,    Fla.:
    Examination and survey ------------------------------------- 530
    Improvement-------                   ---------------------------------------
                                            ,                                                               523
Wohoa Bay and Pleasant River, Maine, examination---
                                                .....                                --                    58
Wolf Bay, Ala., improvement of intracoastal waterway via _______ ___                                     553
Wolf River, Miss., improvement---    ------------------------------                                      591
Wolf River (Memphis Harbor), Tenn--------------                                                          767
Wolf River (tributary of the Fox), Wis., improvement-......                                             1037
Woodbridge Creek, N. J., improvement- ----        ----                                     ----          201
Woodbury Creek, N. J., improvement- -------- _       _..__....                                           260
1586                                       INDEX

Wrangell Harbor and Narrows, Alaska.:                                                 Page
   Improvement of harbor ------------------------------------                         1398
    Improvement of narrows-----------------------------------                         1387
Wrecks:
    Appropriations------------       -------------------------------                  1516
    Expenditures during the year- --                     ___------------------- _ 10, 1516
   Permanent appropriation for__------------------------------                     -     8
    Removal of------------------------------------------------                        1516
Wrightsville Beach, N. C., examination and survey------------------                    402



Yalobusha River, Miss., improvement_7---------------------------                              42
Yamhill River, Oreg.:
    Improvement --------------                   --------------------------                 1327
    Operating and care of lock and dam                    --- --------------------          1333
Yaquina Bay, Harbor, and River, Oreg.:
    Improvement of bay and harbor .---------------------------                              1308
    Improvement of river         --------------------------------------                     1306
    Review of reports on bay, river, and entrance- ------------                             1355
Yazoo River, Miss.:
    Improvement---         ----------------------------------------                 ---       40
    Improvement of mouth-                  --------------------------------                  748
Ybor Estuary Channel, Fla., improvement of Tampa Harbor --- ____--                           511
Yellow Mill Pond, Bridgeport, Conn., improvement- -__-- ------                                92
Yellowstone River, N. Dak., Mont., and Wyo., improvement----------                           850
York Harbor, Maine, improvement                   ------------------------                    34
York River, Va.:
    Improvement ---------------------------------------------                               305
    Review of reports------------------------------------------312
York Spit, Chesapeake Bay, Va., shoals opposite, removal--_____----                          274
Youghiogheny River, Pa.:
    Examination and survey-------------.---------                                __          954
    Improvement        --      ---------------------------------------                       950
Yuba River, Calif.:
    Construction of restraining dams -------       _--_-__--_______                     _   1431
    Review of reports--------------------------------- ------------                         1296



Zanesville,   Ohio, engineering district_         ----------------------                     955
